3GPP TDocs (written contributions) at meeting
Meeting: R2-107 - 2019-08-26 to 2019-08-30, Prague
meeting id: R2-107 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R2‑1908600 | Agenda for RAN2#107 | Chairman | imported from 3GU |
R2‑1908601 | RAN2#106 Meeting Report | MCC | imported from 3GU |
R2‑1908602 | LS on piggy-backing of NAS PDUs (C1-193111; contact: Qualcomm) | CT1 | imported from 3GU |
R2‑1908603 | Reply LS on piggy-backing of NAS PDUs in NGAP messages (C1-193528; contact: Ericsson) | CT1 | imported from 3GU |
R2‑1908604 | Reply LS on Security failure of NAS container in HO command (C1-193708; contact: Intel) | CT1 | imported from 3GU |
R2‑1908605 | Reply LS on Release-with-Redirect in 2-step resume procedure (C1-193910; contact: Oppo) | CT1 | imported from 3GU |
R2‑1908606 | Impersonation Attacks in 4G Networks (CVD Doc24_01 LS to 3GPP; contact: GSMA) | GSM Association | imported from 3GU |
R2‑1908607 | Liaison reply to 3GPP liaison ‘Update to LS on RoHC utilization for Ethernet header compression’ R2-1908152 (IEEE_802d3_to_3GPP_0519; contact: Nokia) | IEEE 802.3 | imported from 3GU |
R2‑1908608 | LS on channel quality report in connected mode for NB-IoT (R1-1907624; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1908609 | LS to RAN on Coexistence of NB-IoT with NR (R1-1907635; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1908610 | LS on LTE-MTC coexistence with NR (R1-1907636; contact: Ericsson) | RAN1 | imported from 3GU |
R2‑1908611 | Reply LS on ETWS/CMAS in connected mode narrowband (R1-1907637; contact: LGE) | RAN1 | imported from 3GU |
R2‑1908612 | Reply LS on CSI-RS configuration transfer over Xn (R1-1907810; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1908613 | LS on MAC CE design for SCell BFR (R1-1907870; contact: Ericsson) | RAN1 | imported from 3GU |
R2‑1908614 | Reply LS on RACH agreements for NR-U (R1- 1907902; contact: Charter Communications) | RAN1 | imported from 3GU |
R2‑1908615 | Reply LS to RAN2 on mode-1 retransmission indication (R1-1907905; contact: Ericsson) | RAN1 | imported from 3GU |
R2‑1908616 | Reply LS to SA2 on use of Range parameter in NR sidelink (R1-1907908; contact: LGE) | RAN1 | imported from 3GU |
R2‑1908617 | Reply LS on physical layer data rate of RAN-assisted codec adaptation (R1-1907911; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1908618 | Reply LS on the usage of SDAP in MTSI and re-usability of delay and error profiles (R1-1907912; contact: Samsung) | RAN1 | imported from 3GU |
R2‑1908619 | LS response on UL sharing applicability in different scenarios (R1-1907937; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1908620 | LS on UE power saving (R1-1907939; contact: CATT) | RAN1 | imported from 3GU |
R2‑1908621 | LS Reply on 2-step RACH MsgA content and power control (R1-1907948; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1908622 | LS Reply on reporting Tx DC location for supplementary uplink carrier (R1-1907949; contact: Spreadtrum Communications) | RAN1 | imported from 3GU |
R2‑1908623 | LS on RRC parameters for Cross-carrier scheduling with different numerologies (R1-1907953; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1908624 | LS on RAN1 NR UE features (R1-1907954; contact: NTT DOCOMO) | RAN1 | imported from 3GU |
R2‑1908625 | LS on PDCCH monitoring for NR-DC (R1-1907956; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1908626 | Reply LS on SPS/CG for IIoT (R1-1907961; contact: LGE) | RAN1 | imported from 3GU |
R2‑1908627 | LS on MIMO enhancement for NR (R1-1907966; contact: Samsung) | RAN1 | imported from 3GU |
R2‑1908628 | Reply LS on Mobile-terminated Early Data Transmission (R3-193156; contact: Ericsson) | RAN3 | imported from 3GU |
R2‑1908629 | Reply LS on Combinations of Uu QoS characteristics values for V2X services (R3-193258; contact: Huawei) | RAN3 | imported from 3GU |
R2‑1908630 | LS on RACH and Mobility Robustness optimisation (R3-193281; contact: CATT) | RAN3 | imported from 3GU |
R2‑1908631 | Reply LS on QoS Monitoring (R3-193282; contact: NTT DOCOMO) | RAN3 | imported from 3GU |
R2‑1908632 | LS on TX DC location (R4-1905486; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1908633 | Reply LS on capability of measurement gap patterns (R4-1907195; contact: Intel) | RAN4 | imported from 3GU |
R2‑1908634 | Updated reply LS on intra-band combination for NR-CA and MR-DC (R4-1907206; contact: Intel) | RAN4 | imported from 3GU |
R2‑1908635 | Reply LS on RRC processing delay for BWP switching (R4-1907214; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1908636 | Reply LS on clarification of CSI-RS based RRM measurement (R4-1907221; contact: ZTE) | RAN4 | imported from 3GU |
R2‑1908637 | Reply LS on SFTD measurement (R4-1907319; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1908638 | LS to RAN2 on SRS-RSRP measurement resource configuration (R4-1907386; contact: LGE) | RAN4 | imported from 3GU |
R2‑1908639 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) (R4-1907479; contact: CMCC) | RAN4 | imported from 3GU |
R2‑1908640 | LS on UE feature list for NR (R4-1907593; contact: NTT DOCOMO) | RAN4 | imported from 3GU |
R2‑1908641 | LS on NR mobility enhancement (R4-1907730; contact: Intel) | RAN4 | imported from 3GU |
R2‑1908642 | Reply to LS on non-anchor carrier idle mode measurements for RRM (R4-1907735; contact: Qualcomm) | RAN4 | imported from 3GU |
R2‑1908643 | LS on the capability and signalling for LTE high speed in R16 (R4-1907738; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1908644 | LS on UE demodulation performance enhancement indicator for HST-SFN scenario (R4-1907764; contact: NTT DOCOMO) | RAN4 | imported from 3GU |
R2‑1908645 | Reply LS on PARLOS RAN impacts (RP-191592; contact: Ericsson) | RAN | imported from 3GU |
R2‑1908646 | Reply on Combinations of Uu QoS characteristics values for V2X services (S2 -1906340; contact: Huawei) | SA2 | imported from 3GU |
R2‑1908647 | Reply LS on piggybacking of NAS PDUs (S2-1906597; contact: Ericsson) | SA2 | imported from 3GU |
R2‑1908648 | LS reply on the usage of SDAP in MTSI and re-usability of delay and error profiles (S2-1906762; contact: Samsung) | SA2 | imported from 3GU |
R2‑1908649 | Reply LS on Support of EPS fallback for voice for eLTE (S2-1906796; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908650 | Reply LS on PARLOS RAN impacts (S2-1906806; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908651 | LS on RAN sharing and Emergency services with Non-Public Networks (S2-1906814; contact: Intel and MediaTek) | SA2 | imported from 3GU |
R2‑1908652 | LS on LTE-M identification in 5GC (S2-1906831; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908653 | LS on Potential improvements for delay critical QoS Flows (S2-1906832; contact: Huawei) | SA2 | imported from 3GU |
R2‑1908654 | LS on maximum value of MDBV (S2-1907955; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908655 | LS on Broadcast of Location Assistance Data for NR (S2-1908104; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908656 | Reply LS to Reply LS on protection of PC5-RRC messages for sidelink unicast communication (S2-1908229; contact: LGE) | SA2 | imported from 3GU |
R2‑1908657 | LS reply on QoS modelling for SL unicast in EPC (S2-1908232; contact: Oppo) | SA2 | imported from 3GU |
R2‑1908658 | Reply LS on support for flow based QoS & slicing for NB-IoT & eMTC connected to 5GC (S2-1908552; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908659 | Reply LS on RRC Connection Re-Establishment for CP for NB-IoT connected to 5GC (S2-1908553; contact: Huawei) | SA2 | imported from 3GU |
R2‑1908660 | Reply LS on DL-only UE-based positioning (S2-1908624; contact: Nokia) | SA2 | imported from 3GU |
R2‑1908661 | Reply LS on assistance indication for WUS grouping (S2-1908625; contact: Huawei) | SA2 | imported from 3GU |
R2‑1908662 | Reply LS on mapping restriction for LCP procedure (S2-1908626; contact: Vivo) | SA2 | imported from 3GU |
R2‑1908663 | LS on Enhancements to QoS Handling for V2X Communication Over Uu Reference Point (S2-1908627; contact: Huawei) | SA2 | imported from 3GU |
R2‑1908664 | Reply LS on Mobile-terminated Early Data Transmission (S2-1908629; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1908665 | Reply LS to on authentication of group of IoT devices (S3-191601; contact: Huawei) | SA3 | imported from 3GU |
R2‑1908666 | Reply LS on protection of PC5-RRC messages for sidelink unicast communication (S3-191622; contact: LGE) | SA3 | imported from 3GU |
R2‑1908667 | Reply to LS on Ciphering solution for broadcast of Assistance Data (S3-192268; contact: Nokia) | SA3 | imported from 3GU |
R2‑1908668 | LS reply on Handling of UE radio network capabilities in 4G and 5G (S3-192271; contact: NTT DOCOMO) | SA3 | imported from 3GU |
R2‑1908669 | Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC (S3-192394; contact: Huawei) | SA3 | imported from 3GU |
R2‑1908670 | LS on PC5 unicast and groupcast security protection (S3-192421; contact: LGE) | SA3 | imported from 3GU |
R2‑1908671 | LS on radio resource management policy (S5-194458; contact: Nokia and Ericsson) | SA5 | imported from 3GU |
R2‑1908672 | Reply LS on Support of EPS fallback for voice for eLTE (R3-193257; contact: Nokia) | RAN3 | imported from 3GU |
R2‑1908673 | Discussion on validity of early measurement results | Qualcomm Incorporated | imported from 3GU |
R2‑1908674 | Remaining issues of email discussion # 37 | Qualcomm Incorporated | imported from 3GU |
R2‑1908675 | Discussion on interaction between cell reselection procedure and early measurements | Qualcomm Incorporated | imported from 3GU |
R2‑1908676 | Discussion on interaction between cell reselection procedure and early measurements | Qualcomm Incorporated | imported from 3GU |
R2‑1908677 | Remaining issues of email discussion#36 | Qualcomm Incorporated | imported from 3GU |
R2‑1908678 | Discussion on common SCell configuration | Qualcomm Incorporated | imported from 3GU |
R2‑1908679 | Introducing suspension of SCG | Qualcomm Incorporated | imported from 3GU |
R2‑1908680 | Remaining issues of fast MCG recovery | Qualcomm Incorporated | imported from 3GU |
R2‑1908681 | Discussion on primaryPath switch in fast MCG recovery | Qualcomm Incorporated | imported from 3GU |
R2‑1908682 | Discussion on RRC configured SCell state in resume procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1908683 | CR to 38.331 on support of corss-carrier scheduling with different numerology | Qualcomm Incorporated | imported from 3GU |
R2‑1908684 | Discussion on fast SCell activation based on measurements prior to activation in NR | Qualcomm Incorporated, Verizon, Sprint, Charter Communications, Vodafone | imported from 3GU |
R2‑1908685 | Discussion on fast SCell activation based on measurements prior to activation in NR | Qualcomm Incorporated, Verizon, Sprint, Charter Communications, Vodafone | imported from 3GU |
R2‑1908686 | Summary of email discussion [106#36] [NR/eCA-DC]: measurement and reporting configuration | Qualcomm Incorporated | imported from 3GU |
R2‑1908687 | Support of IDC in NR SA | Qualcomm Incorporated | imported from 3GU |
R2‑1908688 | Text Proposal for addition of Phase Bias Indicator for SSR Phase Bias message | Swift Navigation | imported from 3GU |
R2‑1908689 | Resource Selection for Msg1 in NR-U | vivo | imported from 3GU |
R2‑1908690 | RA-RNTI Calculation for Extended RAR Window | vivo | imported from 3GU |
R2‑1908691 | Starting Condition of Contention Resolution Timer in NR-U | vivo | imported from 3GU |
R2‑1908692 | LBT Impacts on 2-step RACH | vivo | imported from 3GU |
R2‑1908693 | Discussion on the Failure Detection of the UL Transmission | vivo | imported from 3GU |
R2‑1908694 | Remaining Issues of NR-U Paging | vivo | imported from 3GU |
R2‑1908695 | Enhancements of System Information in NR-U | vivo | imported from 3GU |
R2‑1908696 | Discussion on the UE Camping on the Non-best Cell in NR-U | vivo | imported from 3GU |
R2‑1908697 | CAPC Restriction to Data Multiplexing for Configured Grant | vivo | imported from 3GU |
R2‑1908698 | Remaining Issues on Contention Resolution in 2-step RACH | vivo | imported from 3GU |
R2‑1908699 | Fallback Procedure from 2-step to 4-step RACH | vivo | imported from 3GU |
R2‑1908700 | Selection between 2-step and 4-step RACH | vivo | imported from 3GU |
R2‑1908701 | Discussion on the Resource Selection for MsgA | vivo | imported from 3GU |
R2‑1908702 | Considerations on MAC PDU Format for 2-step RACH | vivo | imported from 3GU |
R2‑1908703 | Considerations on the MsgA without PRACH Transmission | vivo | imported from 3GU |
R2‑1908704 | Differentiation between 2-step and 4-step RACH | vivo | imported from 3GU |
R2‑1908705 | Prioritized Random Access Parameters for 2-step RACH | vivo | imported from 3GU |
R2‑1908706 | Enabling NavIC GNSS assistance data support | Reliance Jio | imported from 3GU |
R2‑1908707 | CR-Enabling NavIC GNSS assistance data support in LTE positioning protocol | Reliance Jio | imported from 3GU |
R2‑1908708 | Discussion on sidelink related capability signaling | OPPO | imported from 3GU |
R2‑1908709 | Left issue on cell reselection for NR-V2X | OPPO | imported from 3GU |
R2‑1908710 | Discussion on SL-related UL RRC report | OPPO | imported from 3GU |
R2‑1908711 | Left issues on LCP for NR-V2X | OPPO | imported from 3GU |
R2‑1908712 | Discussion on RLC mode configuration collision | OPPO | imported from 3GU |
R2‑1908713 | Left issues on RLC for NR-V2X | OPPO | imported from 3GU |
R2‑1908714 | Left issues on PDCP for NR-V2X | OPPO | imported from 3GU |
R2‑1908715 | Left issues on SDAP for NR-V2X | OPPO | imported from 3GU |
R2‑1908716 | Left issues on HARQ for NR-V2X | OPPO | imported from 3GU |
R2‑1908717 | Summary of [106#77] V2X Prioritisation (OPPO) | OPPO | imported from 3GU |
R2‑1908718 | Left issues on UL-SL prioritization for NR-V2X | OPPO | imported from 3GU |
R2‑1908719 | [Draft] LS on UL-SL prioritization | OPPO | imported from 3GU |
R2‑1908720 | [DRAFT] LS on HARQ option for group-cast | OPPO | imported from 3GU |
R2‑1908721 | Left issues on SIB for NR-V2X | OPPO | imported from 3GU |
R2‑1908722 | Left issue for configured SL grant | OPPO | imported from 3GU |
R2‑1908723 | Discussion on assistance information for interface selection | OPPO | imported from 3GU |
R2‑1908724 | Left issues on PC5-RRC based capability transfer procedure | OPPO | imported from 3GU |
R2‑1908725 | Abnormal case for unicast link establishment procedure | OPPO | imported from 3GU |
R2‑1908726 | Left issues for group-cast | OPPO | imported from 3GU |
R2‑1908727 | Discussion on RRM for NR-V2X | OPPO | imported from 3GU |
R2‑1908728 | Discussion on RLM for NR-V2X | OPPO | imported from 3GU |
R2‑1908729 | Discussion on network involvement in unicast link establishment | OPPO | imported from 3GU |
R2‑1908730 | Discussion on single vs. multiple PC5-RRC connection | OPPO | imported from 3GU |
R2‑1908731 | Miscellaneous issues on PC5-RRC for unicast | OPPO | imported from 3GU |
R2‑1908732 | Left issues on QoS modelling for NR-V2X | OPPO | imported from 3GU |
R2‑1908733 | Discussion on QoS mapping for NR-V2X | OPPO | imported from 3GU |
R2‑1908734 | Discussion on Inter-RAT Control for NR-V2X | OPPO | imported from 3GU |
R2‑1908735 | Discussion on resource allocation mode for NR-V2X | OPPO | imported from 3GU |
R2‑1908736 | Acknowledgement Instruction for Downlink HARQ feedback | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1908737 | Discussion on unicast connection setup procedure | CATT | imported from 3GU |
R2‑1908738 | RLM / RLF procedure in NR V2X Sidelink | CATT | imported from 3GU |
R2‑1908739 | Summary of 106#78 Cell reselection (CATT) | CATT | imported from 3GU |
R2‑1908740 | Resource (Re-) selection function in NR V2X Sidelink | CATT | imported from 3GU |
R2‑1908741 | Resource allocation mode configuration | CATT | imported from 3GU |
R2‑1908742 | Further discussion on LCP procedure | CATT | imported from 3GU |
R2‑1908743 | New triggers for Uu RRC connection establishment or resume | CATT | imported from 3GU |
R2‑1908744 | Leftover issues for sidelink configured grant | CATT | imported from 3GU |
R2‑1908745 | Draft LS to RAN1 on NR configured sidelink grant | CATT | imported from 3GU |
R2‑1908746 | Leftover issues on SDAP | CATT | imported from 3GU |
R2‑1908747 | Prioritization between UL and SL for NR V2X | CATT | imported from 3GU |
R2‑1908748 | PC5 MAC PDU construction | CATT | imported from 3GU |
R2‑1908749 | NR Uu controlling LTE sidelink SPS | CATT | imported from 3GU |
R2‑1908750 | HARQ feedback configuration for groupcast | CATT | imported from 3GU |
R2‑1908751 | Admission Control for NR SL | CATT | imported from 3GU |
R2‑1908752 | Mobility Issue for LEO in NTN System | CATT | imported from 3GU |
R2‑1908753 | Cell Selection and Reselection Issue in NTN System | CATT | imported from 3GU |
R2‑1908754 | Cell Selection and Reselection Issue between NTN and TN System | CATT | imported from 3GU |
R2‑1908755 | The Impact by Propagation Delay Difference on Connected Mode Measurements | CATT | imported from 3GU |
R2‑1908756 | The Impact by Propagation Delay Difference on Idle or Inactive Mode Measurements | CATT | imported from 3GU |
R2‑1908757 | Consideration on tracking area management | CATT | imported from 3GU |
R2‑1908758 | Logged MDT Configuration in DC scenario | CATT | imported from 3GU |
R2‑1908759 | Detection and Reporting of Out-of-coverage | CATT | imported from 3GU |
R2‑1908760 | [Draft] LS on MDT Configuration of Event triggered Out-of-coverage | CATT | imported from 3GU |
R2‑1908761 | Logged MDT in IDLE or INACTIVE Mode | CATT | imported from 3GU |
R2‑1908762 | Mobility History and State in NR | CATT | imported from 3GU |
R2‑1908763 | Clarification of UL Over-the-air Delay Measurement | CATT | imported from 3GU |
R2‑1908764 | Uncertainty of L2 Measurement Result Related to URLLC | CATT | imported from 3GU |
R2‑1908765 | RACH Report Optimization | CATT | imported from 3GU |
R2‑1908766 | [Draft] Reply LS on RACH Optimization and Mobility Robustness Optimization | CATT | imported from 3GU |
R2‑1908767 | Recording and Reporting of RACH Failure | CATT | imported from 3GU |
R2‑1908768 | Consideration on Successful HO Report | CATT | imported from 3GU |
R2‑1908769 | Contention resolution for C-RNTI MAC CE case | OPPO | imported from 3GU |
R2‑1908770 | Contention resolution for CCCH SDU case | OPPO | imported from 3GU |
R2‑1908771 | Fall back mechanisms for 2-steps RACH | OPPO | imported from 3GU |
R2‑1908772 | RACH initialization and resource selection for 2-step RACH | OPPO | imported from 3GU |
R2‑1908773 | msgB contents and formats in 2-step RACH | OPPO | imported from 3GU |
R2‑1908774 | Clarification on contention free 2-step RACH | OPPO | imported from 3GU |
R2‑1908775 | Procedure of PDCCH-based wake up signalling | OPPO | imported from 3GU |
R2‑1908776 | Consideration on UE indicating to transition out of RRC_CONNECTED state | OPPO | imported from 3GU |
R2‑1908777 | MIMO layer adaptation for power saving | OPPO | imported from 3GU |
R2‑1908778 | UE assistance information for power saving | OPPO | imported from 3GU |
R2‑1908779 | RRM relaxation for power saving | OPPO | imported from 3GU |
R2‑1908780 | msg3 transmission handling in NR-U | OPPO | imported from 3GU |
R2‑1908781 | RA-RNTI issues due to extended RAR window | OPPO | imported from 3GU |
R2‑1908782 | 2-step RACH for NR-U | OPPO | imported from 3GU |
R2‑1908783 | BWP operation impacts for NR-U | OPPO | imported from 3GU |
R2‑1908784 | Enhancements of configured grant in NR-U | OPPO | imported from 3GU |
R2‑1908785 | DRX operation for NR-U | OPPO | imported from 3GU |
R2‑1908786 | SR transmission and procedure for NR-U | OPPO | imported from 3GU |
R2‑1908787 | Uplink LBT failure in NR-U | OPPO | imported from 3GU |
R2‑1908788 | MAC PDU overritten issue in NR-U configured grant | OPPO | imported from 3GU |
R2‑1908789 | RLM enhancements | OPPO | imported from 3GU |
R2‑1908790 | System information enhancements for NR-U | OPPO | imported from 3GU |
R2‑1908791 | UE behavior on WUS occasion in DRX Active Time | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1908792 | RAR MAC PDU Enhancements to support RAR Window Extension | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908793 | Extended PO for Paging in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908794 | Random Access Response Reception in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908795 | Contention Resolution Timer Handling in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908796 | Signaling Multiple UL grants for Msg3 Transmission in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908797 | Draft 38.304 CR for supporting Additional Opportunities for Paging in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908798 | Draft RRC CR for supporting Additional Opportunities for paging in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908799 | Draft MAC CR_Supporting RAR Window Size larger than 10ms in NR-U_Approach 2 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908800 | Draft RRC CR_Supporting RAR Window Size larger than 10ms in NR-U_Approach 2 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908801 | Random Access Resource Selection in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908802 | SI Acquisition for Camping on a Non-best Cell in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908803 | Cell Barring in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908804 | 2 Step RA_12bit Timing Advanced Information | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908805 | 2 Step RA_HARQ Feedback for MsgB | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908806 | 2 Step RA_Msg2 or MsgB for Fallback and Backoff | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908807 | 2 Step RA_Network Response Timing and Contention Resolution Aspects | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908808 | 2 Step RA_MsgA Details | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908809 | 2 Step RA_One or Multiple RRC messages for a UE in Network Response | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908810 | 2 Step RA_RACH prioritisation | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908811 | 2 step RA_Remaining Issues for Fallback from 2 step to 4 step RACH | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908812 | 2 Step RA_Selection between 2 step RACH and 4 step RACH | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908813 | 2 Step RACH_RNTI for Receiving Network Response | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908814 | 2 Step RA_MAC PDU Format for MsgB_Approach 1 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908815 | 2 Step RA_MAC PDU Format for MsgB_Approach 2 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908816 | 2 Step RA_Preamble & RO Configuration | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908817 | BWP Aspects of Sidelink and Uu Prioritisation | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908818 | Impact of Mode 1 Resource Allocation on Uu BWP Operation | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908819 | On Demand SI Acquisition in RRC CONNECTED | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908820 | RRC Connection Initiation Trigger for V2X Sidelink Communication | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908821 | RAN2 Aspects of SCell BFR | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1908822 | Open Issues of Reference Timing Delivery | CATT | imported from 3GU |
R2‑1908823 | Further Discussion on Multiple Active SPS/CGs | CATT | imported from 3GU |
R2‑1908824 | Finer granularity of SPS periodicities | CATT | imported from 3GU |
R2‑1908825 | Discussion on Ethernet Header Compression | CATT | imported from 3GU |
R2‑1908826 | Data/data prioritization rules and framework | CATT | imported from 3GU |
R2‑1908827 | Data/data prioritization timeline | CATT | imported from 3GU |
R2‑1908828 | Data/data prioritization: equal-priority handling | CATT | imported from 3GU |
R2‑1908829 | SR/PUSCH prioritization | CATT | imported from 3GU |
R2‑1908830 | Addressing the reliability in LCP channel mapping restriction | CATT | imported from 3GU |
R2‑1908831 | Handling on Dropped MAC PDU | CATT | imported from 3GU |
R2‑1908832 | Clarification on the number of activated legs | CATT | imported from 3GU |
R2‑1908833 | Dynamic leg selection with CA-only duplication | CATT | imported from 3GU |
R2‑1908834 | Dynamic leg selection with DC+CA duplication | CATT | imported from 3GU |
R2‑1908835 | UE based PDCP duplication activation/deactivation | CATT | imported from 3GU |
R2‑1908836 | Per-packet selective duplication | CATT | imported from 3GU |
R2‑1908837 | Remaining issues of successRAR in 2-step RACH | CATT | imported from 3GU |
R2‑1908838 | Remaining Issues of FallbackRAR in 2-step RACH | CATT | imported from 3GU |
R2‑1908839 | On BAP Configuration for IAB | CATT | imported from 3GU |
R2‑1908840 | On Routing for IAB | CATT | imported from 3GU |
R2‑1908841 | Lossless Transmission in BH Path Switching | CATT | imported from 3GU |
R2‑1908842 | Summary of the Email Discussion [106#43][IAB] Backhaul RLF | CATT | imported from 3GU |
R2‑1908843 | About the need for Satellite identifier in 3GPP | THALES | imported from 3GU |
R2‑1908844 | UE positioning in legacy satellite communication systems | THALES | imported from 3GU |
R2‑1908845 | Multiconnectivity and split PDCP impact | THALES | imported from 3GU |
R2‑1908846 | Broadcast of Barometric Pressure Assistance Data | Polaris Wireless, FirstNet, Intel, AT&T | imported from 3GU |
R2‑1908847 | Addition of broadcast of barometric pressure assistance data | Polaris Wireless, FirstNet, Intel, AT&T | imported from 3GU |
R2‑1908848 | Addition of broadcast of barometric pressure assistance data | Polaris Wireless, FirstNet, Intel, AT&T | imported from 3GU |
R2‑1908849 | CAPC for RACH and PUCCH in NR-U | Mediatek USA Inc | imported from 3GU |
R2‑1908850 | SI scheduling enhancements for NR-U | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1908851 | On Restrictions in Multiplexing of High and Low Priority Bearers in NR-U | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1908852 | Including RSSI and Channel Occupancy in Connected Mode Measurements | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1908853 | CHO Activation | Sharp | imported from 3GU |
R2‑1908854 | CAPC Assignments for SRBs in NR-U | Mediatek USA Inc | imported from 3GU |
R2‑1908855 | Including RSSI and Channel Occupancy in NR-U UE Capabilities | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1908856 | On Analysis of RACH Capacity in NTN | Mediatek US Inc | imported from 3GU |
R2‑1908857 | Improving Cell Re-selection using Next Cell Information | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1908858 | 5G Icon erroneously displayed | AT&T | imported from 3GU |
R2‑1908859 | Signalling aspects for accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908860 | Other issues related to accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908861 | Correction to fix 5G Icon from being erroneously displayed | AT&T | imported from 3GU |
R2‑1908862 | Ethernet header compression in TSC for NR-IIoT | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908863 | Clarification for the paging and PRACH carrier selection | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908864 | Clarification for the paging and PRACH carrier selection-option 1 | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908865 | Clarification for the paging and PRACH carrier selection-option 2 | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908866 | Correction on the field description of nprach-SubCarrierIndex | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908867 | Remaining issues for acquiring ETWS/CMAS information for eMTC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908868 | Remaining issues for DL channel quality report in Msg3 for eMTC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908869 | Further consideration on service based UE grouping for WUS | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908870 | Other remaining issues of UE grouping for WUS | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908871 | Remaining issues for connection to 5GC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908872 | Some remaining issues for MT-EDT | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908873 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1908874 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1908875 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1908876 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1908877 | Normative Annex of CRs Containing Early Implementable Features and Corrections | NTT DOCOMO INC. | imported from 3GU |
R2‑1908878 | Normative Annex of CRs Containing Early Implementable Features and Corrections | NTT DOCOMO INC. | imported from 3GU |
R2‑1908879 | Correction on TDD-UL-DL-Config | CATT | imported from 3GU |
R2‑1908880 | Correction of the secondHopPRB Parameter | CATT | imported from 3GU |
R2‑1908881 | RSRP reporting of SFTD measurement in NR-DC | CATT, MediaTek Inc., ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908882 | Small Corrections for System Information | CATT | imported from 3GU |
R2‑1908883 | Corrections for Inter-node Messages | CATT | imported from 3GU |
R2‑1908884 | Clarification of Layer 3 filtering for E-UTRA | CATT, ZTE Corporation, Sanechips | imported from 3GU |
R2‑1908885 | Clarification on FailureInformation report for NE-DC | CATT | imported from 3GU |
R2‑1908886 | TP for accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid | imported from 3GU |
R2‑1908887 | RAN2 Work Plan for UE Power Saving WI | CATT | imported from 3GU |
R2‑1908888 | Power Saving Signal Procedure and Configuration | CATT | imported from 3GU |
R2‑1908889 | DRX Cycle Impacts on WUS Position/Period | CATT | imported from 3GU |
R2‑1908890 | UE Assistance for Transitioning Out of RRC_CONNECTED | CATT | imported from 3GU |
R2‑1908891 | Per BWP configuration of maxMIMOLayer | CATT | imported from 3GU |
R2‑1908892 | UE assistance for Scell | CATT | imported from 3GU |
R2‑1908893 | Bearer type negotiation | CATT | imported from 3GU |
R2‑1908894 | Bearer type negotiation in MR-DC | CATT | imported from 3GU |
R2‑1908895 | Available Cell Reselection Measurement Result Reporting | CATT | imported from 3GU |
R2‑1908896 | Considerations on SSB Measurement Configuration | CATT | imported from 3GU |
R2‑1908897 | Measurement Configuration in Inactive Mode and MR-DC | CATT | imported from 3GU |
R2‑1908898 | Considerations on Outdated Early Measurement Results | CATT | imported from 3GU |
R2‑1908899 | Direct SCell activation in CA or DC Scenarios | CATT | imported from 3GU |
R2‑1908900 | Consideration on SCG Configuration Methods during RRC Resume Procedure | CATT | imported from 3GU |
R2‑1908901 | Conditional SN addition for fast connection | CATT | imported from 3GU |
R2‑1908902 | Signalling enhancement for Inactive state | CATT | imported from 3GU |
R2‑1908903 | Common Cell Configuration for Signaling Reduction in NR | CATT | imported from 3GU |
R2‑1908904 | Short CSI report for SpCell | CATT | imported from 3GU |
R2‑1908905 | Remaining Issues of Fast MCG Link Recovery | CATT | imported from 3GU |
R2‑1908906 | Fast MCG link recovery via other means (SUL, SCell and SRB3) | CATT | imported from 3GU |
R2‑1908907 | Fallback Mechanisum for Fast Recovery | CATT | imported from 3GU |
R2‑1908908 | Comparison of Mobility Interruption time reduction solutions | Qualcomm Incorporated | imported from 3GU |
R2‑1908909 | Optimizing mobility interruption time for MR-DC mobility scenarios | Qualcomm Incorporated | imported from 3GU |
R2‑1908910 | Control Plane handling and procedures to support Make-Before-Break (MBB) HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908911 | Control Plane handling and procedures to support Dual Connectivity Role Switch (DCRS) based HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908912 | User Plane changes to minimize the mobility interruption during Make-Before-Break (MBB) HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908913 | User Plane changes to minimize the mobility interruption during Dual Connectivity Role Switch (DCRS) based HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908914 | Clarifications on PUSCH switch during Make-Before-Break (MBB) HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908915 | Lossless Make-Before-Break (MBB) HO support for Low latency, high reliability services | Qualcomm Incorporated | imported from 3GU |
R2‑1908916 | ROHC handling during Make-Before-Break (MBB) HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908917 | Source connection SCell handling during MBB HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908918 | Discussion on UE Behavior When More than One Candidate Cell Meets the Condition | CATT | imported from 3GU |
R2‑1908919 | The Capability Coordination for DAPS-RUDI | CATT | imported from 3GU |
R2‑1908920 | PDCP aspects of DAPS | CATT | imported from 3GU |
R2‑1908921 | Some Considerations on CP of DAPS-RUDI | CATT | imported from 3GU |
R2‑1908922 | PDCP aspects Impacts of non-DC based Solutions | CATT | imported from 3GU |
R2‑1908923 | Some Considerations on CP of non-DC based Solutions | CATT | imported from 3GU |
R2‑1908924 | Discussion on Multiple CHO Execution Conditions | CATT | imported from 3GU |
R2‑1908925 | Definition of CHO Execution | CATT | imported from 3GU |
R2‑1908926 | Further Discussion on Cell Evaluation for CHO Cell Selection | CATT | imported from 3GU |
R2‑1908927 | Disscussion on Signalling Structure of CHO Configuration Message | CATT | imported from 3GU |
R2‑1908928 | Consideration on The UE Capability of Supporting CHO | CATT | imported from 3GU |
R2‑1908929 | UE Power Consumption Reduction in RRM Measurement | vivo, CMCC, Intel, Huawei, Hisilicon, Xiaomi, Apple | imported from 3GU |
R2‑1908930 | MsgB Handling for 2-step RACH | ETRI | imported from 3GU |
R2‑1908931 | RACH-Less HO design considerations | Qualcomm Incorporated | imported from 3GU |
R2‑1908932 | MBB HO support for simultaneous Tx not feasible scenarios | Qualcomm Incorporated | imported from 3GU |
R2‑1908933 | Support Tx sharing during MBB HO | Qualcomm Incorporated | imported from 3GU |
R2‑1908934 | Conditional HO configuration handling | Qualcomm Incorporated | imported from 3GU |
R2‑1908935 | MBB HO support for simultaneous Tx not feasible scenarios | Qualcomm Incorporated | imported from 3GU |
R2‑1908936 | UE History Information | Qualcomm Incorporated | imported from 3GU |
R2‑1908937 | RACH Report | Qualcomm Incorporated | imported from 3GU |
R2‑1908938 | Discussion about Successful HO in MRO | Qualcomm Incorporated | imported from 3GU |
R2‑1908939 | LS to RAN3 on RACH Report and Mobility Robustness Optimization | Qualcomm Incorporated | imported from 3GU |
R2‑1908940 | RLF Info Discussion | Qualcomm Incorporated | imported from 3GU |
R2‑1908941 | CN Type Indication for Cell Reselection from NR to LTE | MediaTek Inc. | imported from 3GU |
R2‑1908942 | CN Type Indication for Cell Reselection from NR to LTE | MediaTek Inc. | imported from 3GU |
R2‑1908943 | CN Type Indication for Cell Reselection from NR to LTE | MediaTek Inc. | imported from 3GU |
R2‑1908944 | NR-specific Issues for Conditional Handover Procedures | MediaTek Inc. | imported from 3GU |
R2‑1908945 | Remaining Issues of Conditional Handover Execution | MediaTek Inc. | imported from 3GU |
R2‑1908946 | RRC Configurations Related to Conditional Handover in NR | MediaTek Inc. | imported from 3GU |
R2‑1908947 | Measurement Report for Conditional Handover Procedures | MediaTek Inc. | imported from 3GU |
R2‑1908948 | Mobility Failure Recovery in NR | MediaTek Inc. | imported from 3GU |
R2‑1908949 | RRC Configurations Related to Conditional Handover in LTE | MediaTek Inc. | imported from 3GU |
R2‑1908950 | UE Indication for Transition out of RRC_CONNECTED | MediaTek Inc. | imported from 3GU |
R2‑1908951 | Power Saving for RRM Measurements in NR | MediaTek Inc. | imported from 3GU |
R2‑1908952 | Handling Timers Started in the Middle of PDCCH Periods | NTT DOCOMO INC. | imported from 3GU |
R2‑1908953 | Subframe Counting Scenario for R2-1908952 | NTT DOCOMO INC. | imported from 3GU |
R2‑1908954 | Clarification for Timers Started in the Middle of a PDCCH Period | NTT DOCOMO INC. | imported from 3GU |
R2‑1908955 | CE Mode Threshold Adjustments for non-BL and BL UE | NTT DOCOMO INC. | imported from 3GU |
R2‑1908956 | 2-step RACH vs RACH-less HO | CATT | imported from 3GU |
R2‑1908957 | On the support of simultaneous reception and transmission during handover | Ericsson | imported from 3GU |
R2‑1908958 | Characteristics of the handover interruption solution | Ericsson | imported from 3GU |
R2‑1908959 | Release of source cell in MBB | Ericsson | imported from 3GU |
R2‑1908960 | Data forwarding for reduced handover interruption | Ericsson | imported from 3GU |
R2‑1908961 | Uplink handling during handover with simultaneous connectivity | Ericsson | imported from 3GU |
R2‑1908962 | ROHC handling in MBB handover | Ericsson | imported from 3GU |
R2‑1908963 | Capability and TDM pattern negotiation for MBB | Ericsson | imported from 3GU |
R2‑1908964 | Reduced handover interruption time for services using RLC UM | Ericsson | imported from 3GU |
R2‑1908965 | Signalling aspects of SCG change with minimal interruption | Ericsson | imported from 3GU |
R2‑1908966 | On the need for RACH-less handover | Ericsson | imported from 3GU |
R2‑1908967 | Supported scenarios for RACH-less HO | Ericsson | imported from 3GU |
R2‑1908968 | RACH-less configuration in NR | Ericsson | imported from 3GU |
R2‑1908969 | Beam aspects of RACH-less handover | Ericsson | imported from 3GU |
R2‑1908970 | Characteristics of the handover interruption solution | Ericsson | imported from 3GU |
R2‑1908971 | Uplink handling during handover with simultaneous connectivity | Ericsson | imported from 3GU |
R2‑1908972 | Data forwarding for reduced handover interruption | Ericsson | imported from 3GU |
R2‑1908973 | ROHC handling in eMBB handover | Ericsson | imported from 3GU |
R2‑1908974 | Capability and TDM pattern negotiation for eMBB | Ericsson | imported from 3GU |
R2‑1908975 | Release of source cell in eMBB | Ericsson | imported from 3GU |
R2‑1908976 | RACH-less handover robustness | Ericsson | imported from 3GU |
R2‑1908977 | Overview of SNPN | Ericsson | imported from 3GU |
R2‑1908978 | Overview of PNI-NPN | Ericsson | imported from 3GU |
R2‑1908979 | Discussion on SA2 LS on RAN sharing and Emergency services with Non-Public Networks | Ericsson | imported from 3GU |
R2‑1908980 | Draft Reply LS on RAN sharing and Emergency services with Non-Public Networks | Ericsson | imported from 3GU |
R2‑1908981 | Discussion on the need for Human Readable Network Name (HRNN) in broadcast | Ericsson | imported from 3GU |
R2‑1908982 | Draft LS on the need for Human Readable Network Name (HRNN) in broadcast | Ericsson | imported from 3GU |
R2‑1908983 | NAS triggered Resume followed by Release-with-Redirect | Ericsson | imported from 3GU |
R2‑1908984 | EPS fallback for voice from LTE/5GC | Ericsson | imported from 3GU |
R2‑1908985 | Correcting algorithm key derivation for LTE/5GC in connection resume | Ericsson | imported from 3GU |
R2‑1908986 | Introduction of Multiple LTE-CRS-RateMatchPatterns | Ericsson | imported from 3GU |
R2‑1908987 | Report of Email Discussion [106#71][NR/NTN] HARQ (Nomor) | Nomor Research GmbH | imported from 3GU |
R2‑1908988 | Multiple PLMN Identities in NTN | Nomor Research GmbH | imported from 3GU |
R2‑1908989 | System Information in NTN | Nomor Research GmbH | imported from 3GU |
R2‑1908990 | Further D-PUR configuration aspects | Gemalto N.V. | imported from 3GU |
R2‑1908991 | Correction on redundant reporting of overheating indication and delay budget report | MediaTek Inc. | imported from 3GU |
R2‑1908992 | LEO mobility issue in NTN | CENC | imported from 3GU |
R2‑1908993 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE | imported from 3GU |
R2‑1908994 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE | imported from 3GU |
R2‑1908995 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE | imported from 3GU |
R2‑1908996 | summary of Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT | imported from 3GU |
R2‑1908997 | Summary of the interface request by gNB and UE in RAT-Dependent positioning methods | CATT | imported from 3GU |
R2‑1908998 | Consideration on mechanism of SI broadcasting for positioning | CATT | imported from 3GU |
R2‑1908999 | Broadcast Assistance Data with the Active BWP | CATT | imported from 3GU |
R2‑1909000 | Clarification to fullConfig in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909001 | Clarification to fullConfig in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909002 | Support of UL sharing for FDD bands | Nokia, Nokia shanghai Bell | imported from 3GU |
R2‑1909003 | Clarifications to the DL sharing capabilities | Nokia, Nokia shanghai Bell | imported from 3GU |
R2‑1909004 | Clarification on non-support of DL sharing capabilities (38.306) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909005 | Correction to DL sharing capabilities (38.331), Alt.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909006 | Correction to DL sharing capabilities (38.306), Alt.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909007 | Correction to DL sharing capabilities (38.331), Alt.2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909008 | Correction to DL sharing capabilities (38.306), Alt.2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909009 | RRC configuration of CHO commands | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909010 | UE capabilities for CHO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909011 | FR2 aspects of early measurements | Nokia, Nokia shanghai Bell | imported from 3GU |
R2‑1909012 | Suspension of SCG | Nokia, Nokia shanghai Bell | imported from 3GU |
R2‑1909013 | Efficient RRC Configuration with low latency | Nokia, Nokia shanghai Bell | imported from 3GU |
R2‑1909014 | Introduction of multiple LTE CRS rate-matching patterns | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909015 | Introduction of multiple LTE CRS rate-matching patterns | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909016 | Introduction of multiple LTE CRS rate-matching patterns | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909017 | On Maximum Number of CHO Candidate Targets | Charter Communications, Inc | imported from 3GU |
R2‑1909018 | CHO “Bye” Indication on the source link | Charter Communications, Inc | imported from 3GU |
R2‑1909019 | LS on Conditional Handover in E-UTRAN and NR | Charter Communications, Inc | imported from 3GU |
R2‑1909020 | Clarification to fullConfig in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909021 | Clarification to fullConfig in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909022 | Clarification to fullConfig in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909023 | UE CLI Measurement Configuration And Reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909024 | Neighbor cell information for configuration of UE CLI measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909025 | Report of Email discussion [106#63][NB-IoT R16] IRAT Cell Selection Assistance information | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909026 | Idle mode ANR Measurements for NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909027 | Further analysis of Msg2 based MT-EDT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909028 | Secuirty Aspects of D-PUR for CP Solution | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909029 | Analysis of D-PUR configuration signalling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909030 | Updates for positioning measurement gaps for subframe and slot timing detection towards E-UTRA | MediaTek Inc., Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909031 | On-demand system information for UEs in RRC_CONNECTED | MediaTek Inc., CATT, Intel Corporation | imported from 3GU |
R2‑1909032 | Broadcast assistance data for UE-based positioning | MediaTek Inc. | imported from 3GU |
R2‑1909033 | On PUSCH Switch for Dual Active Protocol Stack solution for RUDI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909034 | PDCP Coordination for DAPS solution for RUDI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909035 | Security Handling for Dual Active Protocol stack solution | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909036 | Analysis of DAPS Operation for HO RUDI procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909037 | Analysis of uplink Intrruption time reduction for DAPS solution | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909038 | RLM and Handover Failure Detection in Dual-Active Protocol Stack | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909039 | Mobility Robustness for Dual active Protoocol stack | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909040 | Contents and handling of PC5-RRC configuration | MediaTek Inc. | imported from 3GU |
R2‑1909041 | RLM and state modelling based on PC5-S connection | MediaTek Inc. | imported from 3GU |
R2‑1909042 | RLM with aperiodic reference signals | MediaTek Inc. | imported from 3GU |
R2‑1909043 | On-demand system information for RRC_CONNECTED V2X UEs | MediaTek Inc. | imported from 3GU |
R2‑1909044 | Validity areas based on cell lists | MediaTek Inc. | imported from 3GU |
R2‑1909045 | Single vs. multiple PC5-RRC connections | MediaTek Inc. | imported from 3GU |
R2‑1909046 | Introduction of RACS [36.300] | MediaTek Inc. | imported from 3GU |
R2‑1909047 | Introduction of RACS [38.300] | MediaTek Inc. | imported from 3GU |
R2‑1909048 | Support of delta signalling for UE capability identity | MediaTek Inc. | imported from 3GU |
R2‑1909049 | Report of email discussion [106#34][NR/RACS] UE capability ID in relation to filters (MediaTek) | MediaTek Inc. | imported from 3GU |
R2‑1909050 | Work plan for RACS-RAN work item | MediaTek Inc., CATT | imported from 3GU |
R2‑1909051 | DRAFT LS on Maintenance and transfer of UE capability ID | MediaTek Inc. | imported from 3GU |
R2‑1909052 | ASN.1 handling of variable-size lists without ToAddMod/ToRelease structures | MediaTek Inc. | imported from 3GU |
R2‑1909053 | Revision to Non-Terrestrial Networks reference scenarios parameters | THALES, HNS | imported from 3GU |
R2‑1909054 | Early measurement reporting before security activation | China Unicom | imported from 3GU |
R2‑1909055 | proposals on validity of measurement beyond the validity area | China Unicom | imported from 3GU |
R2‑1909056 | Disscussion on validityArea for early measurement reporting | China Unicom | imported from 3GU |
R2‑1909057 | R2- Discussion on UE UTRAN capability information | China Unicom | imported from 3GU |
R2‑1909058 | Discussion on UE handover failure from 5G to 3G for SRVCC | China Unicom | imported from 3GU |
R2‑1909059 | Discussion on NR V2X UE operations under different RRC states | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909060 | Cell selection and reselection in NR V2X | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909061 | Discussion on PC5 RRC procedure for unicast | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909062 | Discussion on UE capability transfer | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909063 | Consideration on PC5-S signalling transmission at AS layer | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909064 | Discussion on SLRB configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909065 | Consideration on RLC AM for unicast | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909066 | Discussion on configured grant resource allocation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909067 | Discussion on NR UL/SL prioritization | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909068 | Discussion on mode 1 resource request | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909069 | Discussion on multi-mode co-existence | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909070 | Consideration on HARQ feedback | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909071 | Consideration on criteria for interface availability | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909072 | V2X sidelink RRM measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909073 | System information handling | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909074 | Summary report of SLRB configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909075 | Exceptional resource pool | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909076 | Cross-RAT resource allocation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909077 | NR V2X MAC PDU | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909078 | NR V2X groupcast HARQ feedback | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909079 | Discussion on NR V2X mode 2 resource allocation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909080 | Consideration on SDAP issues | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909081 | (draft)LS to SA2 on NR V2X groupcast option 2 | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909082 | Mobility Consideration in NR-U | Spreadtrum Communications | imported from 3GU |
R2‑1909083 | Measurement report enhancement in conditional handover | Spreadtrum Communications | imported from 3GU |
R2‑1909084 | RRC signaling size restriction in CHO | Spreadtrum Communications | imported from 3GU |
R2‑1909085 | Wakeup signaling in DRX | Spreadtrum Communications | imported from 3GU |
R2‑1909086 | Consideration on early measurement reporting | Spreadtrum Communications | imported from 3GU |
R2‑1909087 | Discussion on capability transfer procedure for NR V2X | Spreadtrum Communications | imported from 3GU |
R2‑1909088 | Consideration of delta Signalling use cases for UE capability ID | Spreadtrum Communications | imported from 3GU |
R2‑1909089 | Container combination of UE capability ID | Spreadtrum Communications | imported from 3GU |
R2‑1909090 | Filter ID for the selection of UE capability ID | Spreadtrum Communications | imported from 3GU |
R2‑1909091 | Some remaining issues on UE capability ID | Spreadtrum Communications | imported from 3GU |
R2‑1909092 | Discussion on RLM/RLF for SL unicast | Spreadtrum Communications | imported from 3GU |
R2‑1909093 | Extending the number of HARQ processes via Multiple C-RNTIs | Spreadtrum Communications | imported from 3GU |
R2‑1909094 | Impacts caused by measurement variations in NTN | Spreadtrum Communications | imported from 3GU |
R2‑1909095 | Asymmetric UL and DL frame timing at gNB side | Spreadtrum Communications | imported from 3GU |
R2‑1909096 | Procedure enhancements of early measurement reporting for RRC_INACTIVE | Spreadtrum Communications | imported from 3GU |
R2‑1909097 | Discussion on procedure for successful case of 2-step RACH | Spreadtrum Communications | imported from 3GU |
R2‑1909098 | Logical Channel Prioritization Consideration | Spreadtrum Communications | imported from 3GU |
R2‑1909099 | Packet based duplication | Spreadtrum Communications | imported from 3GU |
R2‑1909100 | LCP Enhancements for TSN traffic | Spreadtrum Communications | imported from 3GU |
R2‑1909101 | Handling for resource collision of equal priority | Spreadtrum Communications | imported from 3GU |
R2‑1909102 | Consideration on periodicity misalignment between TSN traffic periodicity and CG periodicity | Spreadtrum Communications | imported from 3GU |
R2‑1909103 | Consideration of LBT failures in Non-connected state | Spreadtrum Communications | imported from 3GU |
R2‑1909104 | Considerations on UL LBT Failures Handling | Spreadtrum Communications | imported from 3GU |
R2‑1909105 | Logged MDT Report in MR-DC | Spreadtrum Communications | imported from 3GU |
R2‑1909106 | Clarification for enabling of configured PUSCH frequency hopping | Spreadtrum Communications | imported from 3GU |
R2‑1909107 | Early measurement in NR-U | Spreadtrum Communications | imported from 3GU |
R2‑1909108 | Discussion on CSI-RS measurement for early measurement reporting | MediaTek Inc. | imported from 3GU |
R2‑1909109 | Split Threshold for DC and NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909110 | Failure Cases | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909111 | Fast Recovery with CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909112 | NPN Work Plan | Nokia, China Telecom (Rapporteurs) | imported from 3GU |
R2‑1909113 | NPN Stage 2 Draft CR | Nokia, China Telecom (Rapporteurs) | imported from 3GU |
R2‑1909114 | PDCP Reordering Problems | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909115 | PDCP Reordering Improvements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909116 | Power Saving and TAT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909117 | Short BSR Accuracy | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909118 | Fixed LCP Restrictions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909119 | QoS Flow Relocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909120 | MDBV Enforcement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909121 | NR UTDOA positioning procedure | ZTE Corporation | imported from 3GU |
R2‑1909122 | MAC upgrade for SR dropping in PHY | CATT | imported from 3GU |
R2‑1909123 | BSR trigger issue for CA duplication | CATT | imported from 3GU |
R2‑1909124 | Introduction of SFTD measurement to neighbour cells for NR SA | MediaTek Inc. | imported from 3GU |
R2‑1909125 | Miscellaneous editorial corrections | Samsung | imported from 3GU |
R2‑1909126 | To reduce SCell activation delay in NR | Samsung | imported from 3GU |
R2‑1909127 | TA handling in 2-step RACH | Samsung | imported from 3GU |
R2‑1909128 | MAC PDU overwritten issue on the configured grants in NR-U | Samsung | imported from 3GU |
R2‑1909129 | CAPC for the configured grants | Samsung | imported from 3GU |
R2‑1909130 | Introduction of SFTD measurement to neighbour cells for NR SA | MediaTek Inc. | imported from 3GU |
R2‑1909131 | RAN2 impacts on simultaneous mode-1 and mode-2 configuration for NR SL communication | Huawei, CATT, ASUSTek, vivo, MediaTek Inc., ITL, Fujitsu, KT Corporation, Xiaomi, Nokia, Nokia Shanghai Bell, InterDigital Inc., HiSilicon | imported from 3GU |
R2‑1909132 | Discussion on SFTD measurement | MediaTek Inc. | imported from 3GU |
R2‑1909133 | LS on SFTD measurements | MediaTek Inc. | imported from 3GU |
R2‑1909134 | Capability of measurement gap patterns | MediaTek Inc. | imported from 3GU |
R2‑1909135 | Clarification on UE capability change | MediaTek Inc. | imported from 3GU |
R2‑1909136 | Clarification on UE capability change | MediaTek Inc. | imported from 3GU |
R2‑1909137 | Correction on usage of access category 2 for UAC for RNA update | MediaTek Inc. | imported from 3GU |
R2‑1909138 | RRC Reconfiguration via SRB3 in NR-DC and NGEN-DC | MediaTek Inc. | imported from 3GU |
R2‑1909139 | Discussion on fast recovery | MediaTek Inc. | imported from 3GU |
R2‑1909140 | Discussion on measurement gap capability | MediaTek Inc. | imported from 3GU |
R2‑1909141 | Clarification on mobility of UE configured with SN terminated DRB without SCG | NEC | imported from 3GU |
R2‑1909142 | Source cell signalling during CHO execution | NEC | imported from 3GU |
R2‑1909143 | CHO configurations for multiple candidate cells | NEC | imported from 3GU |
R2‑1909144 | Reuse of conditional handover for SCG change in NR-DC | NEC | imported from 3GU |
R2‑1909145 | CHO configurations for multiple candidate cells | NEC | imported from 3GU |
R2‑1909146 | Initiation of fast MCG recovery | NEC | imported from 3GU |
R2‑1909147 | Details on fallback mechanisms | NEC | imported from 3GU |
R2‑1909148 | On Supporting Make-Before-Break in NR | Samsung | imported from 3GU |
R2‑1909149 | Introducing Make-Before-Break in NR | Samsung | imported from 3GU |
R2‑1909150 | On Supporting RACH-less in NR RRC aspect | Samsung | imported from 3GU |
R2‑1909151 | On Supporting RACH-less in NR RRC aspect | Samsung | imported from 3GU |
R2‑1909152 | On Supporting RACH-less in NR MAC aspect | Samsung | imported from 3GU |
R2‑1909153 | Consideration on the MsgB content and format | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909154 | Remaining issues on the usage of 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909155 | Stage 3 issues for 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909156 | Resource configuration and selection for 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909157 | Running MAC CR for 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909158 | Stage2 CR for 2-step RACH | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd, Nokia (Stage2 spec rapporteur) | imported from 3GU |
R2‑1909159 | MsgB Open Issues | ZTE Corporation, Sanechips, Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909160 | Open aspects of fallback operation | ZTE Corporation, Sanechips, Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909161 | Framework for detecting consistent LBT failures | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909162 | UL data multiplexing and channel access priority for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909163 | Multiple Msg1 transmission opportunities | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909164 | RAR window expansion for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909165 | Discussion on configured grant for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909166 | DRX operation for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909167 | Considerations on camping on non-best cell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909168 | Paging enhancements for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909169 | Recovery from consistent LBT failures | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909170 | Updates to reestablishment procedure | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909171 | (De)Prioritizing the Access for IAB Setup | Samsung | imported from 3GU |
R2‑1909172 | On Triggering Relaxed RRM measurement in RRC_IDLE and RRC_INACTIVE | Samsung | imported from 3GU |
R2‑1909173 | UE Assistance Information for NR | Samsung | imported from 3GU |
R2‑1909174 | On indicating LBT failure for NR-U | Samsung | imported from 3GU |
R2‑1909175 | PLMN Selection for NR-U | Samsung | imported from 3GU |
R2‑1909176 | Confirm the understanding and agreements for DAPS | Mediatek Inc., Intel Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑1909177 | RLM for NR-U | Samsung | imported from 3GU |
R2‑1909178 | UL Handling with DAPS during RUDI handover | Mediatek Inc., Qualcomm Incorporated, Intel Corporation, Charter Communications, vivo, OPPO, Apple | imported from 3GU |
R2‑1909179 | PDCP Details for RUDI during HO with DAPS | Mediatek Inc., Qualcomm Incorporated, Intel Corporation, Charter Communications | imported from 3GU |
R2‑1909180 | Bearer handling for RUDI during HO with DAPS | Mediatek Inc., Intel Corporation, Qualcomm Incorporated,Charter Communications | imported from 3GU |
R2‑1909181 | Security handling for RUDI during HO with DAPS | Mediatek Inc. | imported from 3GU |
R2‑1909182 | Data forwarding to minimize user data interruption during HO | Mediatek Inc. | imported from 3GU |
R2‑1909183 | Prioritization between URLLC data and MAC CE in MAC PDU | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1909184 | [Draft] LS on data forwarding enhancements to minimize user data interruption during HO | Mediatek Inc. | imported from 3GU |
R2‑1909185 | Consideration on Mobility Interruption Reduction in Different Scenarios | Mediatek Inc. | imported from 3GU |
R2‑1909186 | User Plane Details in DC-based Solutions | Mediatek Inc. | imported from 3GU |
R2‑1909187 | User Plane Details in Non-DC-based Solutions | Mediatek Inc. | imported from 3GU |
R2‑1909188 | General Consideration on HO/SCG Interruption in NR | Mediatek Inc. | imported from 3GU |
R2‑1909189 | GNSS location for Immediate MDT | Samsung | imported from 3GU |
R2‑1909190 | RLF Report Enhancement | Samsung | imported from 3GU |
R2‑1909191 | RRC Establishment Failure Reporting in NR | Samsung | imported from 3GU |
R2‑1909192 | 37340_draftCR_MCG link fast recovery in MR-DC | vivo, Ericsson(Rapporteur) | imported from 3GU |
R2‑1909193 | Power control for NR-NR DC | vivo | imported from 3GU |
R2‑1909194 | Report of106#35NR_DCCA Validity area (vivo) | vivo | imported from 3GU |
R2‑1909195 | Early measurements reporting before RRCResume message | vivo | imported from 3GU |
R2‑1909196 | UE measurement behaviour regarding autonomous state transition | vivo | imported from 3GU |
R2‑1909197 | Measurement result reporting for Inactive State | vivo | imported from 3GU |
R2‑1909198 | IDC impact for early measurement | vivo | imported from 3GU |
R2‑1909199 | Discussion on fast radio link recovery | vivo | imported from 3GU |
R2‑1909200 | Solution for speeding up SCell activation | vivo | imported from 3GU |
R2‑1909201 | Configuration of INACTIVE state for MR-DC | vivo | imported from 3GU |
R2‑1909202 | Minimize signaling overhead for cell setup of MR-DC | vivo | imported from 3GU |
R2‑1909203 | Remaining issues on MCG fast recovery | vivo | imported from 3GU |
R2‑1909204 | Discussion on the MCG failure via Scell | vivo | imported from 3GU |
R2‑1909205 | MDT Operation under IDC impact | Samsung | imported from 3GU |
R2‑1909206 | Supporting MDT for RRC_Idle and RRC_Inactive | Samsung | imported from 3GU |
R2‑1909207 | Introducing More Transmission Opportunities for DL SPS in NR-U | vivo | imported from 3GU |
R2‑1909208 | Logging On-demand SI-Related Information in Logged MDT | Samsung | imported from 3GU |
R2‑1909209 | Logging SUL Coverage Information in Logged MDT | Samsung | imported from 3GU |
R2‑1909210 | On Reporting Random Access-related Information | Samsung | imported from 3GU |
R2‑1909211 | On Providing Mobility State and Mobility History Information in NR | Samsung | imported from 3GU |
R2‑1909212 | RRC Resume Failure Reporting in NR | Samsung | imported from 3GU |
R2‑1909213 | Consideration on MDT in NR | Xiaomi Communications | imported from 3GU |
R2‑1909214 | Consideration on extending RAR window size | Xiaomi Communications | imported from 3GU |
R2‑1909215 | Consideration on SR transmission | Xiaomi Communications | imported from 3GU |
R2‑1909216 | Channel Quality Indication in Msg3 | Xiaomi Communications | imported from 3GU |
R2‑1909217 | Consideration on the number of SSB and beam in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909218 | Consideration on the impact of disabling HARQ on DRX | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909219 | Corrections to 38331 on SI-schedulingInfo | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909220 | Clarification on the definition of over-the-air delay in UL | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909221 | Discussion on counting inactive UE in NR | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909222 | Discussion on PRB usage of a cell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909223 | Further considerations on RACH optimization | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909224 | Concerns on MME Being Unaware of WUS in Rel-15 | NTT DOCOMO INC. | imported from 3GU |
R2‑1909225 | OTDOA positioning in NR | ZTE Corporation | imported from 3GU |
R2‑1909226 | E-CID positioning in NR | ZTE Corporation | imported from 3GU |
R2‑1909227 | Further Details on the Bye Message | ETRI | imported from 3GU |
R2‑1909228 | Problems in Evaluation of CHO Execution Condition | ETRI | imported from 3GU |
R2‑1909229 | Signalling Overhead Reduction for CHO | ETRI | imported from 3GU |
R2‑1909230 | Faster Handover Failure Recovery | ETRI | imported from 3GU |
R2‑1909231 | Faster Handover Failure Recovery | ETRI | imported from 3GU |
R2‑1909232 | Common Single and Dual Active eMBB Solution | ETRI | imported from 3GU |
R2‑1909233 | Data Forwarding Options and Interruption Time | ETRI | imported from 3GU |
R2‑1909234 | Data Forwarding Options and Interruption Time | ETRI | imported from 3GU |
R2‑1909235 | RRC impacts of asynchronous NR-NR DC | Qualcomm Incorporated | imported from 3GU |
R2‑1909236 | The issue of putting all SIBs in one SI message | PANASONIC R&D Center Germany, MediaTek Inc. | imported from 3GU |
R2‑1909237 | SI update notification and PWS notification in WUS | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1909238 | Discussion on the RACH Type Selection | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1909239 | PDCP Duplication Configuration | Mediatek Inc. | imported from 3GU |
R2‑1909240 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909241 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909242 | Clarification on multi-beam measurement quantity derivation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909243 | Paging in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909244 | Paging in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909245 | Paging in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909246 | Consecutive failed connection attempts in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909247 | CR to 38.300 on CAPC mapping in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909248 | Details of early measurement configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909249 | Reporting the idle mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909250 | direct activation in Resume | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909251 | dormant behaviour in RAN2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909252 | Efficient RRC Configuration with low latency | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909253 | UE guard timer for MCG failure indication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909254 | Discussion on the leaving conditions for LTE CHO | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1909255 | Discussion on the leaving conditions for NR CHO | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1909256 | Report of [106#70][NRNTN]RACH capacity and procedures | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909257 | TP on RACH capacity evaluation and procedures | ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1909258 | Consideration on the limited C-RNTI size in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909259 | [DRAFT] LS on handling the limited size of C-RNTI in NTN(FS_NR_NTN_solutions) | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909260 | Consideration on measurements in NTN-TN service continuity | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909261 | Utilization of the ephemeris information in cell selection and reselection | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909262 | Preventing UE with low transmission power from camping on satellite cell with high altitude | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909263 | Further consideration on tracking area management in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909264 | Consideration on system information update in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909265 | Further consideration on mobility in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909266 | Location report in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909267 | Consideration on the System Information of the Private Network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909268 | Consideration on the Access control for the Private Network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909269 | Consideration on the cell selection of the Private Network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909270 | Consideration on the PCI split for the Private Network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909271 | Consideration on the autonomous search function of the private network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909272 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909273 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909274 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909275 | DRX enhancement for NR-U | PANASONIC R&D Center Germany, InterDigital, SONY, Charter Communications, Convida Wireless | imported from 3GU |
R2‑1909276 | Considerations on RLC/PDCP Sequence Numbers and Window Size in NTN | Nomor Research GmbH | imported from 3GU |
R2‑1909277 | Impact of disabling HARQ on DRX | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1909278 | Draft LS to RAN4 on RRM measurement relaxation in power saving | vivo | imported from 3GU |
R2‑1909279 | Further views on NR V2X System Information | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909280 | On Prioritizing SL versus UL in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909281 | Further granularity of prioritizing UCI versus SL transmissions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909282 | On the deficiencies of indicating the buffer size in SL BSR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909283 | PC5 capability transfer via one-way or two-way exchange | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909284 | Network Based Monitoring and Reporting of QoS parameters for NR V2X Sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909285 | On switching PUSCH in split-bearer solutions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909286 | RACH-less HO in beam-based system | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909287 | CFRA resources update for Conditional Handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909288 | On keeping CHO commands after handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909289 | On the actions upon RLF or HOF when CHO was configured | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909290 | Time to say goodbye to bye message in CHO execution | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909291 | Implicit versus explicit release of prepared cells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909292 | On informing the candidate target about CHO execution condition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909293 | On CHO configuration consistency and validity | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909294 | Considerations for failure recovery in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909295 | Beam selection and consolidation enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909296 | Improved uplink power boosting during handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909297 | Missing reportAddNeighMeas in ReportConfigInterRAT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909298 | Split bearer solution for reducing the service interruption time during HO in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909299 | On Random Access resource selection for CHO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909300 | Mobility challenges for NR V2X platooning/groupcast | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909301 | On the configuration of CSI-RSs for inter-node measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909302 | Draft response LS on CSI-RS configuration transfer over Xn | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909303 | Email discussion summary of [106#80][NR/V2X] - BSR and SR | Huawei (Rapporteur) | imported from 3GU |
R2‑1909304 | TP on LTE V2X for TR 37.985 - RAN2 parts | Huawei (Rapporteur) | imported from 3GU |
R2‑1909305 | Overview of Non-Public Networks | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909306 | SNPN selection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909307 | CAG impacts on cell selection and reselection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909308 | Adding NIDs and CAG Identifiers to SIB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909309 | Adding Human-Readable network names for NPNs to SIB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909310 | Preventing non-NPN UEs from selecting NPN cells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909311 | Draft Reply LS on RAN Sharing and Emergency services with Non-Public Networks | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909312 | UE capability coordination for DAPS-RUDI handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909313 | Considerations on measurement gaps and the support of asynchronous deployments in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909314 | Discussion on PLMN and Cell selection and reselection enhancements for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909315 | PLMN and Cell selection and reselection enhancements for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909316 | Report of the email discussion [106#50] Channel Access Priority Class selection in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909317 | RLM/RLF measurement on NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909318 | On UL transmissions during SMTC in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909319 | Conditional handover performance in FR2 band | Ericsson | imported from 3GU |
R2‑1909320 | Configuration of conditional handover in LTE | Ericsson | imported from 3GU |
R2‑1909321 | Triggering of conditional handover in LTE | Ericsson | imported from 3GU |
R2‑1909322 | Conditional handover execution in LTE | Ericsson | imported from 3GU |
R2‑1909323 | Conditional handover failures in LTE | Ericsson | imported from 3GU |
R2‑1909324 | Suspend while monitoring CHO in LTE | Ericsson | imported from 3GU |
R2‑1909325 | Security implications of CHO | Ericsson | imported from 3GU |
R2‑1909326 | Fast RLF triggering based on timer T312 | Ericsson | imported from 3GU |
R2‑1909327 | Repetition of RRC messages at handover | Ericsson | imported from 3GU |
R2‑1909328 | RRC connection re-establishment for handover failure recovery | Ericsson | imported from 3GU |
R2‑1909329 | Measurement reporting overhead reduction based on enhanced event triggering | Ericsson | imported from 3GU |
R2‑1909330 | Configuration of conditional handover in NR | Ericsson | imported from 3GU |
R2‑1909331 | Triggering of conditional handover in NR | Ericsson | imported from 3GU |
R2‑1909332 | Conditional handover execution in NR | Ericsson | imported from 3GU |
R2‑1909333 | Handling of a HO command while UE is monitoring CHO | Ericsson | imported from 3GU |
R2‑1909334 | Conditional handover failures in NR | Ericsson | imported from 3GU |
R2‑1909335 | Suspend while monitoring CHO in NR | Ericsson | imported from 3GU |
R2‑1909336 | Security implications of CHO | Ericsson | imported from 3GU |
R2‑1909337 | Further beam specific aspects on CHO | Ericsson | imported from 3GU |
R2‑1909338 | Draft LS on CHO modification | Ericsson | imported from 3GU |
R2‑1909339 | Draft LS on CHO execution | Ericsson | imported from 3GU |
R2‑1909340 | Comparison of solutions for handover robustness | Ericsson | imported from 3GU |
R2‑1909341 | Fast RLF triggering based on timer T312 | Ericsson | imported from 3GU |
R2‑1909342 | Fast handover failure recovery | Ericsson | imported from 3GU |
R2‑1909343 | Repetition of RRC messages at handover | Ericsson | imported from 3GU |
R2‑1909344 | TP for 38.331 on CHO | Ericsson | imported from 3GU |
R2‑1909345 | Correction of QoE measurement collection | Ericsson | imported from 3GU |
R2‑1909346 | Correction of QoE measurement collection | Ericsson | imported from 3GU |
R2‑1909347 | Handover to UTRAN for SRVCC | Ericsson | imported from 3GU |
R2‑1909348 | Draft LS to RAN6 on return to 5G after incoming SRVCC | Ericsson | imported from 3GU |
R2‑1909349 | Clarification of IRAT mobility support in 38.300 | Ericsson | imported from 3GU |
R2‑1909350 | Draft 38.300 CR for introduction of SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1909351 | TP for introduction of SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1909352 | Additional paging transmission opportunities in NR-U | Ericsson | imported from 3GU |
R2‑1909353 | TP on 38.304 on additional paging transmission opportunities | Ericsson | imported from 3GU |
R2‑1909354 | TP on 38.331 for additional paging transmission opportunities | Ericsson | imported from 3GU |
R2‑1909355 | Whitelistning and blacklistning for cell (re)selection | Ericsson | imported from 3GU |
R2‑1909356 | TP on 38.331 for whitelists for cell reselection | Ericsson | imported from 3GU |
R2‑1909357 | Managing PCI collisions in NR-U | Ericsson | imported from 3GU |
R2‑1909358 | SI-windows in NR-U | Ericsson | imported from 3GU |
R2‑1909359 | Cell (re)selection cell barring related to forbidden PLMNs | Ericsson | imported from 3GU |
R2‑1909360 | TP on 38.304 for cell (re)selection related to forbidden PLMNs | Ericsson | imported from 3GU |
R2‑1909361 | Conditional handover for NR-U | Ericsson | imported from 3GU |
R2‑1909362 | Connected mode mobility in NR-U | Ericsson | imported from 3GU |
R2‑1909363 | Report of email discussion [106#76][NR/Positioning] SSR grid definition | u-blox AG | imported from 3GU |
R2‑1909364 | RRC running CR on TSC reference time distribution | Ericsson | imported from 3GU |
R2‑1909365 | Remaining issues for reference time delivery | Ericsson | imported from 3GU |
R2‑1909366 | DL SPS configuration and HARQ aspects | Ericsson | imported from 3GU |
R2‑1909367 | On support of non-integer multiple of CG/SPS periodicities | Ericsson | imported from 3GU |
R2‑1909368 | Measurement gaps for TSN traffic | Ericsson | imported from 3GU |
R2‑1909369 | MDBV in IIoT | Ericsson | imported from 3GU |
R2‑1909370 | EHC principles | Ericsson | imported from 3GU |
R2‑1909371 | EHC solution | Ericsson | imported from 3GU |
R2‑1909372 | Robustness of EHC | Ericsson | imported from 3GU |
R2‑1909373 | Main functions of intra-UE data-data prioritization | Ericsson | imported from 3GU |
R2‑1909374 | Reliability aspects in LCP restriction enhancement | Ericsson | imported from 3GU |
R2‑1909375 | Handling of de-prioritized MAC PDUs | Ericsson | imported from 3GU |
R2‑1909376 | Intra-UE Control-Data prioritization – SR over PUSCH | Ericsson | imported from 3GU |
R2‑1909377 | draft LS on intra-UE control-data prioritization – SR over PUSCH | Ericsson | imported from 3GU |
R2‑1909378 | Relation between configured, activated RLC entities, and number of copies | Ericsson | imported from 3GU |
R2‑1909379 | PDCP Control PDUs and primary path | Ericsson | imported from 3GU |
R2‑1909380 | MAC CE Rel-15 and MAC CE Rel-16 to control of Rel-16 PDCP | Ericsson | imported from 3GU |
R2‑1909381 | MAC CE format design | Ericsson | imported from 3GU |
R2‑1909382 | UE-based mechanisms for PDCP duplication | Ericsson | imported from 3GU |
R2‑1909383 | PDCP discard timers | Ericsson | imported from 3GU |
R2‑1909384 | On configuration aspects of multiple CG | Ericsson | imported from 3GU |
R2‑1909385 | On MAC aspects of multiple CG | Ericsson | imported from 3GU |
R2‑1909386 | Discussion on potential improvements for delay critical QoS flows | Ericsson | imported from 3GU |
R2‑1909387 | Draft reply LS on potential improvements for delay critical QoS flows | Ericsson | imported from 3GU |
R2‑1909388 | Details for Ethernet header compression solution | Intel Corporation | imported from 3GU |
R2‑1909389 | PDCP duplication with multiple RLC entities | Intel Corporation | imported from 3GU |
R2‑1909390 | Clarification on SFTD measurement and CGI reporting | Intel Corporation | imported from 3GU |
R2‑1909391 | Clarification on SFTD measurement and CGI reporting | Intel Corporation | imported from 3GU |
R2‑1909392 | TSC assistance information | Intel Corporation | imported from 3GU |
R2‑1909393 | Security requirement for UE capability enquiry for NR | Intel Corporation, NTT DoCoMo, Ericsson, Apple | imported from 3GU |
R2‑1909394 | Security requirement for UE capability enquiry for LTE | Intel Corporation, NTT DoCoMo, Ericsson, Apple | imported from 3GU |
R2‑1909395 | Intra-E-UTRA inter-system handover | Intel Corporation, Sharp | imported from 3GU |
R2‑1909396 | Handling lists other than AddMod | Intel Corporation | imported from 3GU |
R2‑1909397 | Clarification on SRB2 and DRB configuration | Intel Corporation | imported from 3GU |
R2‑1909398 | Open items related to delta configuration with ServingCellConfigCommon | Intel Corporation | imported from 3GU |
R2‑1909399 | NAS handling error of nas-Container for security key derivation | Intel Corporation | imported from 3GU |
R2‑1909400 | Emergency support for SNPN and CAG | Intel Corporation | imported from 3GU |
R2‑1909401 | RAN sharing for SNPN and CAG | Intel Corporation | imported from 3GU |
R2‑1909402 | [DRAFT] Reply LS on RAN sharing and Emergency services with Non-Public Networks | Intel Corporation | imported from 3GU |
R2‑1909403 | Access Control for SNPN and CAG | Intel Corporation | imported from 3GU |
R2‑1909404 | Handling on UE inactive AS context | Intel Corporation | imported from 3GU |
R2‑1909405 | Support of Idle mode measurement in RRC_INACTIVE | Intel Corporation | imported from 3GU |
R2‑1909406 | Support of On demand SI for broadcast of assistance data | Intel Corporation | imported from 3GU |
R2‑1909407 | Support of UE based DL only positioning | Intel Corporation | imported from 3GU |
R2‑1909408 | [Draft] Reply to LS on Impersonation Attacks in 4G Networks | Intel Corporation | imported from 3GU |
R2‑1909409 | Access control differentiation for IMS registration related signalling | Intel Corporation | imported from 3GU |
R2‑1909410 | PDU session release indication to upper layers during Full Configuration in eLTE | Intel Corporation | imported from 3GU |
R2‑1909411 | PDU session release indication to upper layers during Full Configuration | Intel Corporation | imported from 3GU |
R2‑1909412 | Exceptional Pool for NR V2X | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R2‑1909413 | QoS Management for NR V2X | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R2‑1909414 | Reconfiguration while monitoring CHO | Ericsson India Private Limited | imported from 3GU |
R2‑1909415 | Stage-2 procedure for make-before-break handover | Ericsson | imported from 3GU |
R2‑1909416 | DL and UL NR Positioning Procedures | Qualcomm Incorporated | imported from 3GU |
R2‑1909417 | Draft CR to38.305: Transmission Measurement Function in NG-RAN | Qualcomm Incorporated | imported from 3GU |
R2‑1909418 | GNSS SSR Assistance Data | Qualcomm Incorporated | imported from 3GU |
R2‑1909419 | Running LPP CR for PPP-RTK support (SSR) | Qualcomm Incorporated | imported from 3GU |
R2‑1909420 | Running LTE RRC CR for PPP-RTK support (SSR) | Qualcomm Incorporated | imported from 3GU |
R2‑1909421 | Broadcast of Location Assistance Data by NG-RAN | Qualcomm Incorporated | imported from 3GU |
R2‑1909422 | Draft CR to 38.305: Broadcast of assistance data | Qualcomm Incorporated | imported from 3GU |
R2‑1909423 | Draft CR to 38.331: Addition of broadcast of positioning assistance data | Qualcomm Incorporated | imported from 3GU |
R2‑1909424 | Assistance Data for DL-only UE-based mode | Qualcomm Incorporated | imported from 3GU |
R2‑1909425 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | Document Rapporteur (BlackBerry) | imported from 3GU |
R2‑1909426 | TS 38.314 Skeleton | CMCC | imported from 3GU |
R2‑1909427 | Discussion on capturing SA5 defined measurements in TS 38.314 | CMCC | imported from 3GU |
R2‑1909428 | TP to capture SA5 defined measurements in TS 38.314 | CMCC | imported from 3GU |
R2‑1909429 | Discussion on measurement on number of UEs | CMCC | imported from 3GU |
R2‑1909430 | TP to capture measurement on number of UEs in TS 38.314 | CMCC | imported from 3GU |
R2‑1909431 | Motivation for supporting UDC in NR | CMCC, CATT, MediaTek Inc. | imported from 3GU |
R2‑1909432 | Discussion on power saving for inter-frequency measurements | CMCC | imported from 3GU |
R2‑1909433 | Considerations on donor and node routing | CMCC | imported from 3GU |
R2‑1909434 | Considerations on BAP remapping for UP | CMCC | imported from 3GU |
R2‑1909435 | Reflective BAP mapping | CMCC | imported from 3GU |
R2‑1909436 | BWP and sub-band switching for NR-U in RACH | CMCC | imported from 3GU |
R2‑1909437 | Further considerations on LBT failures | CMCC | imported from 3GU |
R2‑1909438 | Further considerations on paging occasions for NR-U | CMCC | imported from 3GU |
R2‑1909439 | Considerations on mobility for GEO | CMCC | imported from 3GU |
R2‑1909440 | Considerations on mobility for LEO | CMCC | imported from 3GU |
R2‑1909441 | Mobility-state-based cell reselection in NR for HSDN | CMCC | imported from 3GU |
R2‑1909442 | Discussion on IE design of TimeReferenceInfo used for IIOT | CMCC | imported from 3GU |
R2‑1909443 | Discussion on RACH optimization | CMCC | imported from 3GU |
R2‑1909444 | Summary of e-mail discussion: [106#54] [IIoT] Need for and details of UE-based mechanisms for PDCP duplication (CMCC) | CMCC | imported from 3GU |
R2‑1909445 | Further discussion on enhancement of LCP procedure for differentiation between URLLC and eMBB service | CMCC | imported from 3GU |
R2‑1909446 | Enhancement of RLC status report over air interface for DC-based PDCP duplication | CMCC | imported from 3GU |
R2‑1909447 | Discussion on UE capability of maxUplinkDutyCycle for PC2 EN-DC UE | CMCC | imported from 3GU |
R2‑1909448 | CR on capability of maxUplinkDutyCycle for inter-band EN-DC PC2 UE | CMCC | imported from 3GU |
R2‑1909449 | CR on capability of maxUplinkDutyCycle for inter-band EN-DC PC2 UE | CMCC | imported from 3GU |
R2‑1909450 | Discussion on EN-DC cell reselection | CMCC, Huawei,vivo, ZTE, OPPO,xiaomi | imported from 3GU |
R2‑1909451 | Further consideration on measurement configuration and reporting for logged MDT | CMCC | imported from 3GU |
R2‑1909452 | Fallback from 2-step to 4-step RA | CMCC | imported from 3GU |
R2‑1909453 | Discussion of the PUSCH transmission of MsgA | CMCC | imported from 3GU |
R2‑1909454 | PUSCH segmentation and repetition | CMCC | imported from 3GU |
R2‑1909455 | System information related aspects for 2 step RA | CMCC | imported from 3GU |
R2‑1909456 | Analysis on RAN2 impact of Approved TSN Time sync architecture in SA2 | CMCC | imported from 3GU |
R2‑1909457 | Consideration on propagation delay compensation | CMCC | imported from 3GU |
R2‑1909458 | Enhancement of CG/SPS configuraition confirmation | CMCC | imported from 3GU |
R2‑1909459 | Analysis on the RAN1 Reply LS on multiple SPS-CG for IIoT | CMCC | imported from 3GU |
R2‑1909460 | HOW to address non-integer multiple of CG/SPS periodicities | CMCC | imported from 3GU |
R2‑1909461 | LCP restriction for multiple CGs/SPSs | CMCC | imported from 3GU |
R2‑1909462 | Repetitions Transmission for SPS configurations | CMCC | imported from 3GU |
R2‑1909463 | Further consideration on Selective duplication in PDCP duplication | CMCC | imported from 3GU |
R2‑1909464 | Further consideration on PDCP Duplication MAC CE | CMCC | imported from 3GU |
R2‑1909465 | Comparison between non-DC and DC-based solutions for NR | CMCC | imported from 3GU |
R2‑1909466 | Discussion on fast HO Failure Recovery in NR | CMCC | imported from 3GU |
R2‑1909467 | Analysis on LS on RAN sharing and Emergency services with NPN from SA2 | CMCC | imported from 3GU |
R2‑1909468 | Reply LS on RAN sharing and Emergency services with NPN | CMCC | imported from 3GU |
R2‑1909469 | Consideration on the scope and ways of RPN | CMCC | imported from 3GU |
R2‑1909470 | Consideration on standalone NPN | CMCC | imported from 3GU |
R2‑1909471 | Consideration on public network integrated NPN | CMCC | imported from 3GU |
R2‑1909472 | Inter-RAT Deployment scenarios | Sequans Communications | imported from 3GU |
R2‑1909473 | UE storage requirements associated with UE Capability ID | Qualcomm Incorporated | imported from 3GU |
R2‑1909474 | Remaining issues on CLI-RSSI and SRS-RSRP Measurement | Qualcomm Incorporated | imported from 3GU |
R2‑1909475 | UE SRVCC capability | Qualcomm Incorporated | imported from 3GU |
R2‑1909476 | NR to UTRAN SRVCC Procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1909477 | Introduction of SRVCC to UTRAN | Qualcomm Incorporated | imported from 3GU |
R2‑1909478 | EPS Fallback Issues | Qualcomm Incorporated, China Telecom, Verizon, CMCC, T-Mobile USA | imported from 3GU |
R2‑1909479 | Introduction of voice fallback indication | Qualcomm Incorporated | imported from 3GU |
R2‑1909480 | Introduction of voice fallback indication | Qualcomm Incorporated | imported from 3GU |
R2‑1909481 | Measurement gap pattern capability in MR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1909482 | Measurement gap pattern capability in MR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1909483 | Measurement gap pattern capability in MR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1909484 | Expanding range of the Maximum Data Burst Value | Qualcomm Incorporated | imported from 3GU |
R2‑1909485 | DRAFT Reply LS on LS on maximum value of MDBV | Qualcomm Incorporated | imported from 3GU |
R2‑1909486 | Clarifications on TSC Assistance Information | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909487 | [Draft] LS to SA2 on remaining TSCAI aspects | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909488 | Support for TSC message periodicities of non-integer multiple of NR CG/SPS periodicities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909489 | Configuration details of multiple SPS configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909490 | Discussion on supported number of SPS and periodicities for CG/SPS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909491 | SPS collisions with multiple SPS configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909492 | Configuration limitations of multiple SPS and CGs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909493 | Padding removal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909494 | Ethernet header compression design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909495 | LCP restrictions with multiple CG configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909496 | Details on multiple CG/SPS configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909497 | Intra-UE Data Prioritization Schemes for PUSCH Overlapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909498 | Intra-UE Prioritization for Resource Conflicts Involving SR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909499 | Handling of De-prioritized MAC PDUs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909500 | On coexistence of UE-controlled and network-controlled PDCP Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909501 | Views on Per-Packet Selective Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909502 | On Configured Grant Resource for Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909503 | Introducing UE capability for MDT in NR | Ericsson | imported from 3GU |
R2‑1909504 | UE Location Report capability indication for MDT | Ericsson | imported from 3GU |
R2‑1909505 | MDT configuration for Inactive state | Ericsson | imported from 3GU |
R2‑1909506 | Area scope in MDT configuration | Ericsson | imported from 3GU |
R2‑1909507 | Introducing UE capability for MDT in NR | Ericsson | imported from 3GU |
R2‑1909508 | RRC message for logged MDT configuration | Ericsson | imported from 3GU |
R2‑1909509 | Framework for Event based logged MDT in NR | Ericsson | imported from 3GU |
R2‑1909510 | On the relation between UE memory and Logged MDT measurements | Ericsson | imported from 3GU |
R2‑1909511 | Usage of barometric sensor information in the MDT logging | Ericsson | imported from 3GU |
R2‑1909512 | Framework for UE collected measurement reporting in NR | Ericsson | imported from 3GU |
R2‑1909513 | CR on Framework for UE collected measurement reporting in NR | Ericsson | imported from 3GU |
R2‑1909514 | Mobility history information reporting from the UE | Ericsson | imported from 3GU |
R2‑1909515 | Mobility History Information reporting | Ericsson | imported from 3GU |
R2‑1909516 | Plan for WI stage | Ericsson | imported from 3GU |
R2‑1909517 | SN triggered configuration for logged MDT | Ericsson | imported from 3GU |
R2‑1909518 | RAN aspects on changes of UE radio capabilities | Ericsson | imported from 3GU |
R2‑1909519 | Capability Signaling Optimization in LTE | Ericsson | imported from 3GU |
R2‑1909520 | 38.300 TP for Introduction of RACS - NR | Ericsson | imported from 3GU |
R2‑1909521 | 36.300 TP for Introduction of RACS - E-UTRA | Ericsson | imported from 3GU |
R2‑1909522 | Need for Capability ID signalling in RRC | Ericsson | imported from 3GU |
R2‑1909523 | Maximum processing time in case of RRC segmentation | Ericsson | imported from 3GU |
R2‑1909524 | Avoiding interleaving | Ericsson | imported from 3GU |
R2‑1909525 | Draft LS on RAN 2 decision regarding Capability ID & delta signaling | Ericsson | imported from 3GU |
R2‑1909526 | Remaining Filtering Aspects for PLMN assigned ID | Ericsson | imported from 3GU |
R2‑1909527 | Considerations on SSR implementation to LPP | ESA, Mitsubishi Electric | imported from 3GU |
R2‑1909528 | Clarification on max payload of PUCCH-ResourceSet | vivo | imported from 3GU |
R2‑1909529 | Clarification on PUCCH and PUSCH configuration | vivo | imported from 3GU |
R2‑1909530 | Efficient transition from RRC_CONNECTED to RRC_IDLE RRC_INACTIVE | vivo | imported from 3GU |
R2‑1909531 | PDCCH-based Power Saving Signal/Channel and DRX | vivo | imported from 3GU |
R2‑1909532 | Discussion on UE adaptation to maximum number of MIMO layers | vivo | imported from 3GU |
R2‑1909533 | UE assistance information signaling design for power saving | vivo | imported from 3GU |
R2‑1909534 | RRM measurement relaxation in time domain | vivo | imported from 3GU |
R2‑1909535 | RRM measurement relaxation by reducing measured cell number | vivo | imported from 3GU |
R2‑1909536 | Report of EmailDisc-41_CHO execution | vivo | imported from 3GU |
R2‑1909537 | Discussion on the number of prepared cells for CHO | vivo | imported from 3GU |
R2‑1909538 | Discussion on the HOF for CHO | vivo | imported from 3GU |
R2‑1909539 | Fast handover failure recovery in NR | vivo | imported from 3GU |
R2‑1909540 | Conditional Handover without explict trigger condition | vivo | imported from 3GU |
R2‑1909541 | Consideration on the delta signalling of UE capability ID | vivo | imported from 3GU |
R2‑1909542 | Remaining issues for cell level triggers for conditional handover | vivo | imported from 3GU |
R2‑1909543 | Running UE positioning CR for SSR assistance data for GNSS PPP-RTK positioning | ESA, u-blox AG | imported from 3GU |
R2‑1909544 | Details on MT EDT for UP solution (Msg4-based) | Intel Corporation | imported from 3GU |
R2‑1909545 | Details on MT EDT for CP data (Msg2-based) | Intel Corporation | imported from 3GU |
R2‑1909546 | Acquisition of ETWS/CMAS by non-BL UEs in RRC_CONNECTED | Intel Corporation | imported from 3GU |
R2‑1909547 | Remaning issue in DL Quality report | Intel Corporation | imported from 3GU |
R2‑1909548 | Remaning issues on the support of 5GCN connectivity | Intel Corporation | imported from 3GU |
R2‑1909549 | Remaining issues in RRC inactive state | Intel Corporation | imported from 3GU |
R2‑1909550 | Additional issues in D-PUR in RRC_IDLE | Intel Corporation | imported from 3GU |
R2‑1909551 | Non-BL UE operation in standalone deployment | Intel Corporation | imported from 3GU |
R2‑1909552 | Further consideration on Configured UL grant enhancement | Intel Corporation | imported from 3GU |
R2‑1909553 | Paging Enhancement for NR-U | Intel Corporation | imported from 3GU |
R2‑1909554 | Detecting and Handling of UL LBT failures | Intel Corporation | imported from 3GU |
R2‑1909555 | Fast RRC state transition out of RRC_CONNECTED | Intel Corporation | imported from 3GU |
R2‑1909556 | Relaxation of RRM measurements | Intel Corporation, vivo | imported from 3GU |
R2‑1909557 | UE assistance information | Intel Corporation | imported from 3GU |
R2‑1909558 | RAN2 impacts of the wake-up signal | Intel Corporation | imported from 3GU |
R2‑1909559 | MIMO and BWP adaptation | Intel Corporation | imported from 3GU |
R2‑1909560 | Discussion on SIB and dedicated structures for early measurments | Intel Corporation | imported from 3GU |
R2‑1909561 | Remaining aspects on groupcast operation | Intel Corporation | imported from 3GU |
R2‑1909562 | QoS information reporting for NR V2X | Intel Corporation | imported from 3GU |
R2‑1909563 | On admission/congestion control | Intel Corporation | imported from 3GU |
R2‑1909564 | Cross-RAT scheduling for NR V2X SL | Intel Corporation | imported from 3GU |
R2‑1909565 | Channel Access Priority selection & multiplexing for Configured Grant | Intel Corporation | imported from 3GU |
R2‑1909566 | Further criteria on whether the UE uses 2-step RACH or 4-step RACH | Intel Corporation | imported from 3GU |
R2‑1909567 | Further consideration of the fallback to 4-step RACH and BI | Intel Corporation | imported from 3GU |
R2‑1909568 | Further consideration of MsgB design and reception when C-RNTI is included in MsgA | Intel Corporation | imported from 3GU |
R2‑1909569 | Enabling the UE to camp on non-best cell | Intel Corporation | imported from 3GU |
R2‑1909570 | Issues related to random access procedure | Intel Corporation | imported from 3GU |
R2‑1909571 | Running CR for the introduction of NR mobility enhancement | Intel Corporation | imported from 3GU |
R2‑1909572 | Control plane signaling flow for simultaneous connectivity handover | Intel Corporation | imported from 3GU |
R2‑1909573 | CHO execution condition | Intel Corporation | imported from 3GU |
R2‑1909574 | Failure handling on CHO | Intel Corporation | imported from 3GU |
R2‑1909575 | Consideration on the progress and status of NR mobility WI | Intel Corporation | imported from 3GU |
R2‑1909576 | User plane handling for non-split bearer solution | Intel Corporation | imported from 3GU |
R2‑1909577 | Control plane consideration for dual active protocol stack (DAPS) | Intel Corporation | imported from 3GU |
R2‑1909578 | Discussion on handling of BFR for SCell | Intel Corporation | imported from 3GU |
R2‑1909579 | Further consideration on CHO configuration | Intel Corporation | imported from 3GU |
R2‑1909580 | Comparison of DC based vs. MBB based Approaches | Futurewei | imported from 3GU |
R2‑1909581 | Call Flow Analysis for Handover Interruption Time Reduction | Futurewei | imported from 3GU |
R2‑1909582 | Complexity Analysis of Handover Interruption Time Reduction | Futurewei | imported from 3GU |
R2‑1909583 | Performance Analysis of Handover Interruption Time Reduction | Futurewei | imported from 3GU |
R2‑1909584 | Single/Dual Transmitter and Single/Dual Protocol Stacks | Futurewei | imported from 3GU |
R2‑1909585 | Considerations for Geographical Zone Design for NR V2X | InterDigital | imported from 3GU |
R2‑1909586 | LCP for NR V2X | InterDigital | imported from 3GU |
R2‑1909587 | Multiple SL Configured Grants and UE Assistance Information | InterDigital | imported from 3GU |
R2‑1909588 | Resource Pool Aspects for NR V2X | InterDigital | imported from 3GU |
R2‑1909589 | Handling Multiple Unicast Links in NR V2X | InterDigital | imported from 3GU |
R2‑1909590 | RLM/RLF for NR V2X | InterDigital | imported from 3GU |
R2‑1909591 | RAN2 Aspects of Simultaneous Configuration of Mode 1 and Mode 2 | InterDigital | imported from 3GU |
R2‑1909592 | RAN2 Aspects of HARQ for NR V2X | InterDigital | imported from 3GU |
R2‑1909593 | QoS Management for NR V2X | InterDigital | imported from 3GU |
R2‑1909594 | Resume to SCG | InterDigital | imported from 3GU |
R2‑1909595 | Fast MCG link Recovery using SRB3 | InterDigital | imported from 3GU |
R2‑1909596 | Reducing User Data Interruption during HO in LTE | InterDigital | imported from 3GU |
R2‑1909597 | Configuration Details of Conditional HO | InterDigital | imported from 3GU |
R2‑1909598 | Further details on CHO execution | InterDigital | imported from 3GU |
R2‑1909599 | Intra-UE prioritization between data resources | InterDigital | imported from 3GU |
R2‑1909600 | Intra UE prioritization between SR and PUSCH | InterDigital | imported from 3GU |
R2‑1909601 | Scheduling enhancements for TSC traffic | InterDigital | imported from 3GU |
R2‑1909602 | Paging procedure in NR-U | InterDigital | imported from 3GU |
R2‑1909603 | Random access in NR-U | InterDigital | imported from 3GU |
R2‑1909604 | Handling UL LBT Failures in MAC | InterDigital | imported from 3GU |
R2‑1909605 | CAPC selection for configured grant transmission in NR-U | InterDigital | imported from 3GU |
R2‑1909606 | RLM and RLF for NR-U | InterDigital | imported from 3GU |
R2‑1909607 | Fallback procedure to 4-step RA | InterDigital | imported from 3GU |
R2‑1909608 | SN triggered configuration for logged MDT | Ericsson LM | imported from 3GU |
R2‑1909609 | Report of Email Discussion [106#40][NR/Mob enh] Beam specific aspects of CHO | Qualcomm Incorporated | imported from 3GU |
R2‑1909610 | Segmentation in DL | Ericsson LM | imported from 3GU |
R2‑1909611 | Miscellaneous Corrections (Rapporteur) | Qualcomm Incorporated | imported from 3GU |
R2‑1909612 | Introduction of RRC Segmentation - Downlink | Ericsson LM | imported from 3GU |
R2‑1909613 | Introduction of RRC Segmentation DL | Ericsson LM | imported from 3GU |
R2‑1909614 | Introduction of RRC Segmentation - Downlink | Ericsson LM | imported from 3GU |
R2‑1909615 | Introduction of RRC Segmentation - Downlink | Ericsson LM | imported from 3GU |
R2‑1909616 | Correction on handling of SCell(s) during MBB HO – Option 1 | Qualcomm Incorporated | imported from 3GU |
R2‑1909617 | Correction on handling of SCell(s) during MBB HO – Option 1 | Qualcomm Incorporated | imported from 3GU |
R2‑1909618 | Discussion on BAP Layer in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909619 | Consideration on user plane bearer mapping | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909620 | Consideration on control plane bearer mapping | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909621 | Consideration on routing in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909622 | Report of email discussion [106#44][IAB] Flow Control | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909623 | Discussion on flow control in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909624 | Consideration on UL lossless delivery in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909625 | Discussion on low latency scheduling in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909626 | Consideration on the Extension of LCID and LCG Space in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909627 | Discussion on IAB BH RLF handling | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909628 | Discussion on BH RLC channel configuration in IAB network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909629 | Discussion on IAB node connection setup | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909630 | PARLOS RAN2 impacts | Qualcomm Incorporated | imported from 3GU |
R2‑1909631 | Introduction of RLOS support indicator and RLOS request indicator | Qualcomm Incorporated | imported from 3GU |
R2‑1909632 | [DRAFT] Reply LS on PARLOS RAN impacts | Qualcomm Incorporated | imported from 3GU |
R2‑1909633 | Consideration of multi-hop RLC ARQ | Kyocera | imported from 3GU |
R2‑1909634 | Consideration of low latency scheduling for multi-hop backhauling | Kyocera | imported from 3GU |
R2‑1909635 | Further discussion on Backhaul RLF handling | Kyocera | imported from 3GU |
R2‑1909636 | Logged MDT for NR-DC and EN-DC | Kyocera | imported from 3GU |
R2‑1909637 | PC5-RRC state considerations | Kyocera | imported from 3GU |
R2‑1909638 | PC5 L2/L3 protocols for unicast and groupcast | Kyocera | imported from 3GU |
R2‑1909639 | Reselection considerations for NR-U | Kyocera | imported from 3GU |
R2‑1909640 | Recovery due to LBT failures | Kyocera | imported from 3GU |
R2‑1909641 | IAB workplan | Qualcomm Inc (Rapporteur) | imported from 3GU |
R2‑1909642 | IAB configuration of BAP-layer forwarding | Qualcomm Inc | imported from 3GU |
R2‑1909643 | Discussion SCG RACH procedure latency reduction | Qualcomm Incorporated | imported from 3GU |
R2‑1909644 | IAB signaling protocol for BAP configuration | Qualcomm Inc | imported from 3GU |
R2‑1909645 | Supporting RACH-less for fast SN addition | Qualcomm Incorporated | imported from 3GU |
R2‑1909646 | Discussion on fast SCG activation | Qualcomm Incorporated | imported from 3GU |
R2‑1909647 | IAB load reporting to IAB-donor CU-CP | Qualcomm Inc | imported from 3GU |
R2‑1909648 | Support for multiple CG and SPS configurations | NTT DOCOMO, INC. | imported from 3GU |
R2‑1909649 | SMTC for sync SSB frequency and non-sync SSB frequency | OPPO | imported from 3GU |
R2‑1909650 | UE measurement behavior due to lower priority frequency and OOS | OPPO | imported from 3GU |
R2‑1909651 | Fast Scell activation in sTAG | OPPO | imported from 3GU |
R2‑1909652 | Open issues for MCG fast recovery | OPPO | imported from 3GU |
R2‑1909653 | SCell or SCG activation in RRC_INACTIVE | OPPO | imported from 3GU |
R2‑1909654 | RRC Resume for MR-DC with 5GC | OPPO | imported from 3GU |
R2‑1909655 | Security algorithom update in RRC reestablishment message | OPPO | imported from 3GU |
R2‑1909656 | Discussion on RA resource selection | NTT DOCOMO, INC. | imported from 3GU |
R2‑1909657 | Further discussion on MCG failure recovery | SHARP | imported from 3GU |
R2‑1909658 | Flow control in IAB | NEC | imported from 3GU |
R2‑1909659 | IAB backhaul RLF handling | NEC | imported from 3GU |
R2‑1909660 | RLF report for CHO | NEC | imported from 3GU |
R2‑1909661 | DL PDCP SN handling for DAPS | NEC | imported from 3GU |
R2‑1909662 | Capability coordination for DABS based handover | NEC | imported from 3GU |
R2‑1909663 | Remaining issues on simultaneous use of CGRT and CGT | NEC | imported from 3GU |
R2‑1909664 | end to end reliability in IAB | NEC | imported from 3GU |
R2‑1909665 | bearer mapping issue in IAB | NEC | imported from 3GU |
R2‑1909666 | HARQ in NTN | NEC | imported from 3GU |
R2‑1909667 | RRC spec change proposal on IAB NSA operation | KDDI Corporation | imported from 3GU |
R2‑1909668 | Discussion on RLM for LTE mobility enhancement | OPPO | imported from 3GU |
R2‑1909669 | Discussion on RLM for NR mobility | OPPO | imported from 3GU |
R2‑1909670 | Further details on dual active protocol stack | OPPO | imported from 3GU |
R2‑1909671 | Discussion on eMBB-based handover for NR mobility | OPPO | imported from 3GU |
R2‑1909672 | Comparison of DC-based and eMBB-based handover for NR mobility | OPPO | imported from 3GU |
R2‑1909673 | Discussion on SCell BFR | OPPO | imported from 3GU |
R2‑1909674 | Discussion on stand-alone non-public networks | OPPO | imported from 3GU |
R2‑1909675 | Discussion on closed access groups | OPPO | imported from 3GU |
R2‑1909676 | Summary of [106#42] [NR/LTE/mob enh] CHO configuration | OPPO | imported from 3GU |
R2‑1909677 | Further discussion on CHO execution and failure handling | OPPO | imported from 3GU |
R2‑1909678 | Further discussion on CHO execution and failure handling | OPPO | imported from 3GU |
R2‑1909679 | Further consideration on CHO configuration update | OPPO | imported from 3GU |
R2‑1909680 | Further consideration on CHO configuration update | OPPO | imported from 3GU |
R2‑1909681 | Considerations on relations between CHO and legacy handover | Huawei, HiSilicon | imported from 3GU |
R2‑1909682 | Discussion on A4 for CHO execution condition | Huawei, HiSilicon | imported from 3GU |
R2‑1909683 | Discussion on UE behaviors upon re-establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1909684 | Discussion on T304 timer for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909685 | Considerations on modification of CHO configurations by RRC signalling | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1909686 | Considerations on maximum number of CHO candidate cells | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1909687 | Considerations on configurations of CHO target cells | Huawei, HiSilicon | imported from 3GU |
R2‑1909688 | Stage-3 details for CHO triggering conditions | Huawei, HiSilicon | imported from 3GU |
R2‑1909689 | Discussion on CHO triggering condition | Huawei, HiSilicon | imported from 3GU |
R2‑1909690 | Discussion on target cell selection for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909691 | Discussion on T304 timer for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909692 | Discussion on failure handling for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909693 | Discussion on configuration of execution condition for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909694 | Discussion on CHO deconfiguration | Huawei, HiSilicon | imported from 3GU |
R2‑1909695 | Discussion on RACH resource reservation for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909696 | Discussion on the maximum number of candidate cells in CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1909697 | Considerations on modification of CHO configurations by RRC signalling | Huawei, HiSilicon | imported from 3GU |
R2‑1909698 | Discussion on CHO execution | Huawei, HiSilicon | imported from 3GU |
R2‑1909699 | Discussion on RRC Context transfer when retrieving UE context | Huawei, HiSilicon | imported from 3GU |
R2‑1909700 | Correction on RRC Context transfer when retrieving UE context | Huawei, HiSilicon | imported from 3GU |
R2‑1909701 | Correction on RRC Context transfer when retrieving UE context | Huawei, HiSilicon | imported from 3GU |
R2‑1909702 | Correction on RRC Context transfer when retrieving UE context | Huawei, HiSilicon | imported from 3GU |
R2‑1909703 | Correction on the feature downlink SDAP header | Huawei, HiSilicon | imported from 3GU |
R2‑1909704 | Discussion on RAN2 impacts due to incoming LSs on EPS fallback for voice for LTE-5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1909705 | Correction on EPS fallback for voice for LTE-5GC (alt 1) | Huawei, HiSilicon | imported from 3GU |
R2‑1909706 | Correction on EPS fallback for voice for LTE-5GC (alt 2) | Huawei, HiSilicon | imported from 3GU |
R2‑1909707 | Correction on Paging message for LTE-5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1909708 | Initial considerations on stage-2 work for SON and MDT for NR | Huawei, HiSilicon | imported from 3GU |
R2‑1909709 | Discussion on signalling part for logged MDT | Huawei, HiSilicon, LG Uplus | imported from 3GU |
R2‑1909710 | Discussion on signalling part for immediate MDT | Huawei, HiSilicon, LG Uplus | imported from 3GU |
R2‑1909711 | Discussion on user consent for MDT | Huawei, HiSilicon, LG Uplus | imported from 3GU |
R2‑1909712 | Discussion on MDT measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909713 | Discussion on out of coverage logging | Huawei, HiSilicon | imported from 3GU |
R2‑1909714 | Discussion on signalling part for accessibility measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909715 | Discussion on signalling part for failure reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1909716 | Discussion on UE storage impact due to MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1909717 | Discussion on MDT in MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1909718 | Discussion on MDT continuation | Huawei, HiSilicon | imported from 3GU |
R2‑1909719 | Stage-2 CR on MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1909720 | Stage-3 CR on MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1909721 | Discussion on how to capture L2 measurements into RAN2 specs | Huawei, HiSilicon | imported from 3GU |
R2‑1909722 | Discussion on the new TS for NR L2 measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909723 | Discussion on L2 measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909724 | CR on L2 measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909725 | Discussion on the measurement received RA preambles | Huawei, HiSilicon | imported from 3GU |
R2‑1909726 | CR on measurements on received RA preambles | Huawei, HiSilicon | imported from 3GU |
R2‑1909727 | Discussion on number of users in connected and inactive states | Huawei, HiSilicon | imported from 3GU |
R2‑1909728 | CR on measurements on number of users in connected and inactive states | Huawei, HiSilicon | imported from 3GU |
R2‑1909729 | Discussion on DL delay measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909730 | Discussion on UL delay measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909731 | Framework for delay measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909732 | Draft reply LS on QoS Monitoring | Huawei, HiSilicon | imported from 3GU |
R2‑1909733 | Discussion on latency measurement in MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1909734 | Discussion on PDCP end user throughput measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1909735 | Discussion on RACH reporting for SON | Huawei, HiSilicon | imported from 3GU |
R2‑1909736 | Stage-2 CR on RACH reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1909737 | Stage-3 CR on RACH reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1909738 | Discussion on RLF reporting for SON | Huawei, HiSilicon | imported from 3GU |
R2‑1909739 | Stage-2 CR on RLF reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1909740 | Stage-3 CR on RLF reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1909741 | Discussion on mobility history information in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1909742 | Draft LS on mobility history information in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1909743 | Stage-2 CR on mobility history information in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1909744 | Stage-3 CR on mobility history information in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1909745 | Discussion on RACH optimization | China Unicom | imported from 3GU |
R2‑1909746 | Correction on handling of SCell(s) during MBB HO - Option 2 | Qualcomm Incorporated | imported from 3GU |
R2‑1909747 | Correction on handling of SCell(s) during MBB HO - Option 2 | Qualcomm Incorporated | imported from 3GU |
R2‑1909748 | Discussion on On-Demand SI Request in RRC_CONNECTED | OPPO | imported from 3GU |
R2‑1909749 | Discussion on DRX RTT timers in NTN | OPPO | imported from 3GU |
R2‑1909750 | Discussion on random access procedure in NTN | OPPO | imported from 3GU |
R2‑1909751 | Discussion on UL scheduling enhancement in NTN | OPPO | imported from 3GU |
R2‑1909752 | Impacts of disabling HARQ on DRX operation | OPPO | imported from 3GU |
R2‑1909753 | Discussion on timing advance in NTN RACH | OPPO | imported from 3GU |
R2‑1909754 | Discussion on configured grant enhancements in NR-U | Potevio | imported from 3GU |
R2‑1909755 | Considerations on fast handover failure recovery for NR mobility enhancements | Potevio | imported from 3GU |
R2‑1909756 | MsgB PDU Format for Idle/Inactive State | Potevio | imported from 3GU |
R2‑1909757 | Discussion on multiple target cells fulfil CHO | CMCC | imported from 3GU |
R2‑1909758 | Discussion on failure handling | CMCC | imported from 3GU |
R2‑1909759 | Discussion on resource conflict between SR and SR | CMCC | imported from 3GU |
R2‑1909760 | TP to clarify the use of SR-ProhibitTimer | CMCC | imported from 3GU |
R2‑1909761 | Work plan for SON and MDT WI | CMCC | imported from 3GU |
R2‑1909762 | Discussion on the RLF Report | CMCC | imported from 3GU |
R2‑1909763 | TP on Accessibility Measurements | CMCC | imported from 3GU |
R2‑1909764 | TP on MDT for inactive and idle UE | CMCC | imported from 3GU |
R2‑1909765 | TP on MDT for connected UE | CMCC | imported from 3GU |
R2‑1909766 | TP on Logged MDT procedure | CMCC | imported from 3GU |
R2‑1909767 | TP on Immediate MDT procedure | CMCC | imported from 3GU |
R2‑1909768 | LS on Logged Measurements | CMCC | imported from 3GU |
R2‑1909769 | Further Consideration of Beams for NR CHO | CMCC | imported from 3GU |
R2‑1909770 | 2-step RACH power control | CMCC | imported from 3GU |
R2‑1909771 | Introduction of further performance enhancement for LTE in high speed scenario in Rel-16 | CMCC, Huawei, HiSilicon | imported from 3GU |
R2‑1909772 | Introduction of UE capabilities for further performance enhancement for LTE in high speed scenario in Rel-16 | CMCC, Huawei, HiSilicon | imported from 3GU |
R2‑1909773 | Consideration on MAC CE design for single PDCCH based multi-TRP transmission | CMCC | imported from 3GU |
R2‑1909774 | Discussion on Potential Issue of Immediate MDT Reporting | OPPO | imported from 3GU |
R2‑1909775 | Discussion on the RLF and HOF for DAPS | vivo | imported from 3GU |
R2‑1909776 | Discussion on RLM RLF and HOF for non-DC-based solution | vivo | imported from 3GU |
R2‑1909777 | Clarification on the ROHC procedure for DAPS | vivo | imported from 3GU |
R2‑1909778 | Capability coordination between the source and the target | vivo | imported from 3GU |
R2‑1909779 | 2-step RACH in mobility enhancement | vivo | imported from 3GU |
R2‑1909780 | Enhanced RACH-less solution for NR | vivo | imported from 3GU |
R2‑1909781 | RAN2 specification impacts of SCell BFR | vivo | imported from 3GU |
R2‑1909782 | Draft reply LS on SCell BFR | vivo | imported from 3GU |
R2‑1909783 | Introduction of SCell BFR | vivo | imported from 3GU |
R2‑1909784 | Introduction of SCell BFR | vivo | imported from 3GU |
R2‑1909785 | Discussion on misaligned value range of CSI-RS resource ID for SP SRS activation | vivo | imported from 3GU |
R2‑1909786 | Offline discussion summary on NR IDC | vivo | imported from 3GU |
R2‑1909787 | Introduction of NR IDC solution | vivo | imported from 3GU |
R2‑1909788 | Discussion on handover procedure for LEO | OPPO | imported from 3GU |
R2‑1909789 | Discussion on Measurements in Radio Link Failure Report | OPPO | imported from 3GU |
R2‑1909790 | CR on PUCCH frequency hopping capabilites (38.331) | ZTE Corporation, Sanechips, Ericsson | imported from 3GU |
R2‑1909791 | CR on PUCCH frequency hopping capabilites (38.306) | ZTE Corporation, Sanechips, Ericsson | imported from 3GU |
R2‑1909792 | Clarfication on DRX configuration in ANR | ZTE Corporation, Sanechips, Ericsson | imported from 3GU |
R2‑1909793 | Draft LS to clarify DRX configuration in ANR | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909794 | Ambiguity of UE FDD/TDD FR1/FR2 capabilities | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1909795 | CR to clarify UE FDD/TDD FR1/FR2 capabilities | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1909796 | Consideration on CSI-RS configuration transfer | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909797 | draft reply LS on CSI-RS configuration transfer | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909798 | Consideration on CLI remaining issues | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909799 | Remaining issues on UTRAN measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909800 | Consideration on SRVCC capability | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909801 | UE power saving approach in RRM | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909802 | Discussion on RLF & CEF report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909803 | Discussion on MDT in DC scenario | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909804 | Immediate MDT continuity upon handover procedure | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909805 | MDT activation for INACTIVE&IDLE mode UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909806 | Discussion on out-of-coverage measurement and report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909807 | Restriction on MDT measurement and report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909808 | Discussion on UE history information report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909809 | Impact of non-Numeric K1 Value to NR-U DRX | Qualcomm Incorporated | imported from 3GU |
R2‑1909810 | Correction on absThreshSS-BlocksConsolidation and nrofSS-BlocksToAverage for inter-frequency cell reselection | Qualcomm Incorporated | imported from 3GU |
R2‑1909811 | Introduce Uplink Data Compression in NR for Rel-16 | China Telecommunications | imported from 3GU |
R2‑1909812 | BSR reporting when no UL data is available | LG Electronics Inc. | imported from 3GU |
R2‑1909813 | CR to 38.321 on BSR reporting when no UL data is available | LG Electronics Inc. | imported from 3GU |
R2‑1909814 | Redundant retransmission in PDCP duplication | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1909815 | PDCP duplication on split bearer | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1909816 | TM DRB for IIOT | LG Electronics Inc. | imported from 3GU |
R2‑1909817 | Handling of RLC stuck problem with PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1909818 | Considerations on state transition schemes to RRC_INACTIVE | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1909819 | consideration of UL ACK for MSGB reception | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1909820 | consideration of UL ACK for MSGB reception | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1909821 | Contention resolution of 2-step RACH when CCCH message is included in msgA | LG Electronics Inc. | imported from 3GU |
R2‑1909822 | Issues on SRB inclusion in successRAR | LG Electronics Inc. | imported from 3GU |
R2‑1909823 | Contents of successRAR | LG Electronics Inc. | imported from 3GU |
R2‑1909824 | Issue on whether legacy msg2 can be reused for fallbackRAR | LG Electronics Inc. | imported from 3GU |
R2‑1909825 | Need for RAPID MAC CE in payload of msgA | LG Electronics Inc. | imported from 3GU |
R2‑1909826 | RNTI design for msgB | LG Electronics Inc. | imported from 3GU |
R2‑1909827 | Criteria for 2-step RACH selection | LG Electronics Inc. | imported from 3GU |
R2‑1909828 | MAC PDU formats for msgB | LG Electronics Inc. | imported from 3GU |
R2‑1909829 | MAC impacts of multiple CCAs in wide band operation | LG Electronics Inc. | imported from 3GU |
R2‑1909830 | DL opportunity enhancement based on channel busy level in NR-U | LG Electronics Inc. | imported from 3GU |
R2‑1909831 | Measurement gap skipping for TSN traffic | LG Electronics Inc. | imported from 3GU |
R2‑1909832 | Need for quick transition to RRC_IDLE | LG Electronics Inc. | imported from 3GU |
R2‑1909833 | UE information for quick state transition | LG Electronics Inc. | imported from 3GU |
R2‑1909834 | consideration of UL ACK for MSGB reception | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1909835 | On Positioning SIBs in NR | LG Electronics Inc. | imported from 3GU |
R2‑1909836 | Broadcast assistance data support for UE-based Positioning | LG Electronics Inc. | imported from 3GU |
R2‑1909837 | On the Exceptional Pool in NR V2X | LG Electronics Inc. | imported from 3GU |
R2‑1909838 | NR V2X System Information Aspects | LG Electronics Inc. | imported from 3GU |
R2‑1909839 | Remaining issues on 4-step RACH for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1909840 | Simultaneous Mode 1 and Mode 2 Configuration | LG Electronics Inc. | imported from 3GU |
R2‑1909841 | Email discussion report on [106#61] D-PUR Request, (re)configuration and release mechanism | Qualcomm Incorporated | imported from 3GU |
R2‑1909842 | Remaining Aspects of Configured Grant Transmission for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1909843 | DRX Active Time for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1909844 | LTE Mobility Robustness Enhancements for DAPS eMBB HO | Qualcomm Incorporated | imported from 3GU |
R2‑1909845 | MAC Scheduling Aspects of Multi-TTI Grant | Qualcomm Incorporated | imported from 3GU |
R2‑1909846 | Lossless enhanced Make-Before-Break (MBB) HO support for low latency, high reliability services | Qualcomm Incorporated | imported from 3GU |
R2‑1909847 | Running CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1909848 | UL TDM aspects of enhanced MBB HO using Dual Active Protocol Stack | Qualcomm Inc, Charter communications, Intel Corp, MediaTek Inc | imported from 3GU |
R2‑1909849 | Clarification on the node to generate PDCP configuration | Huawei, Hisilicon | imported from 3GU |
R2‑1909850 | CR for PDCP configuration generation | Huawei, Hisilicon | imported from 3GU |
R2‑1909851 | CR on correction of the condition HO-toEUTRAN | Huawei, Hisilicon | imported from 3GU |
R2‑1909852 | CR on correction of condition HO-toNR and HO-Conn | Huawei, Hisilicon | imported from 3GU |
R2‑1909853 | Support of releasing UL configuration | Huawei, Hisilicon, CMCC, China Telecom, MediaTek Inc. | imported from 3GU |
R2‑1909854 | correction on SUO case 1 for NE-DC | Huawei, Hisilicon | imported from 3GU |
R2‑1909855 | UE RF chain requirements to reduce LTE eMBB HO interruption time close to 0ms | Qualcomm Incorporated | imported from 3GU |
R2‑1909856 | UE based PDCP Duplication Enhancement | Apple | imported from 3GU |
R2‑1909857 | Selective PDCP Duplication Enhancement | Apple | imported from 3GU |
R2‑1909858 | Leg Selection for PDCP Duplication | Apple | imported from 3GU |
R2‑1909859 | Enhancement for Single UL capable UE | Apple | imported from 3GU |
R2‑1909860 | Consideration on non-DC based HO | Apple | imported from 3GU |
R2‑1909861 | RACH-less HO | Apple | imported from 3GU |
R2‑1909862 | Consecutive Conditional HO | Apple | imported from 3GU |
R2‑1909863 | Early Measurement Report | Apple | imported from 3GU |
R2‑1909864 | PCell Fast Recovery | Apple | imported from 3GU |
R2‑1909865 | UE Measurement in SCell Dormancy State | Apple | imported from 3GU |
R2‑1909866 | Efficient RRC State Transition | Apple | imported from 3GU |
R2‑1909867 | UE Assistance Information for SCell Activation and Deactivation | Apple | imported from 3GU |
R2‑1909868 | UE Assistance Information for EN-DC | Apple | imported from 3GU |
R2‑1909869 | Consideration on Measurement Relaxation | Apple | imported from 3GU |
R2‑1909870 | Consideration on MsgB Content | Apple | imported from 3GU |
R2‑1909871 | Consideration on 2-step RACH Fallback Case | Apple | imported from 3GU |
R2‑1909872 | RRC Message Transmisson in 2-step RACH | Apple | imported from 3GU |
R2‑1909873 | LCH-to-cell Restriction for CA Duplication Deactivation | Apple, Nokia, Nokia Shanghai Bell, Ericsson, Intel Corporation, NTT DoCoMo Inc, Qualcomm Incorporated | imported from 3GU |
R2‑1909874 | LCH-to-cell Restriction for CA Duplication Deactivation | Apple, Nokia, Nokia Shanghai Bell, NTT DoCoMo Inc, Intel Corporation, Ericsson, Qualcomm Incorporated | imported from 3GU |
R2‑1909875 | UE capability sharing aspects for DAPS based enhanced MBB HO | Qualcomm Inc, Charter communications, Intel Corp, MediaTek Inc | imported from 3GU |
R2‑1909876 | Draft LS to SA5 on PRB usage of a cell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1909877 | UE capability co-ordination signalling aspects for DAPS based enhanced MBB HO | Qualcomm Inc, Charter communications, Intel Corp, MediaTek Inc | imported from 3GU |
R2‑1909878 | LTE Conditional HO failure handling | Qualcomm Inc | imported from 3GU |
R2‑1909879 | Discard indication for UDC | LG Electronics Inc. | imported from 3GU |
R2‑1909880 | Discard indication for UDC | LG Electronics Inc. | imported from 3GU |
R2‑1909881 | Extension of the LCID | LG Electronics Inc. | imported from 3GU |
R2‑1909882 | Discussion on Ethernet Header Compression | LG Electronics Inc. | imported from 3GU |
R2‑1909883 | Discussion on PDCP impact for feMOB | LG Electronics Inc. | imported from 3GU |
R2‑1909884 | Configuration for HARQ turning off | LG Electronics Inc. | imported from 3GU |
R2‑1909885 | Support 0ms interruption handover for UM DRB | LG Electronics Inc. | imported from 3GU |
R2‑1909886 | Discussion on performing ROHC | LG Electronics Inc. | imported from 3GU |
R2‑1909887 | Integrity verification and PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1909888 | Scheduling enhancement in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1909889 | PDCP issue in Fast MCG link Recovery | LG Electronics Inc. | imported from 3GU |
R2‑1909890 | Preventing the tranmission of the uplink data | LG Electronics Inc. | imported from 3GU |
R2‑1909891 | Discussion on PDCP impact for eMOB | LG Electronics Inc. | imported from 3GU |
R2‑1909892 | Support 0ms interruption handover for UM DRB | LG Electronics Inc. | imported from 3GU |
R2‑1909893 | Preventing the tranmission of the uplink data | LG Electronics Inc. | imported from 3GU |
R2‑1909894 | [Draft] LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO | Qualcomm Inc | imported from 3GU |
R2‑1909895 | IAB resource coordination and scheduling | Sony | imported from 3GU |
R2‑1909896 | Routing details in IAB | Sony | imported from 3GU |
R2‑1909897 | IAB System information handling | Sony | imported from 3GU |
R2‑1909898 | BSR enhancement for IAB | Sony | imported from 3GU |
R2‑1909899 | Intra-UE Prioritisation handling of DG vs CG and CG vs CG | Sony | imported from 3GU |
R2‑1909900 | Intra-UE Prioritisation handling of UL Data vs SR | Sony | imported from 3GU |
R2‑1909901 | Reliability, latency and resource efficiency for uplink scheduling | SONY | imported from 3GU |
R2‑1909902 | Feedback and profile ID signaling in EHC | Sony | imported from 3GU |
R2‑1909903 | Location report in NTN | Sony | imported from 3GU |
R2‑1909904 | RRM measurements for UE power saving | Sony | imported from 3GU |
R2‑1909905 | Fall back procedure from 2-step RACH to 4-step RACH msg1 | Sony | imported from 3GU |
R2‑1909906 | PUSCH Configurations for MsgA of 2-step RACH | Sony | imported from 3GU |
R2‑1909907 | Power Saving techniques, UE assistance information | Sony | imported from 3GU |
R2‑1909908 | Bulk handover signalling for mobility enhancement in NTN | Sony | imported from 3GU |
R2‑1909909 | Service continuity in NTN | Sony | imported from 3GU |
R2‑1909910 | On supporting UE-group wake-up signal for MTC/NB-IoT | Sony | imported from 3GU |
R2‑1909911 | Consideration on activation/deactivation for CG Type 1 | Sony | imported from 3GU |
R2‑1909912 | Cell selection/reselection with NPN cells | Sony | imported from 3GU |
R2‑1909913 | Impact Analysis on Introduction of NR UDC | CATT, CMCC, China Telecom, Huawei, HiSilicon, China Unicom, CAICT, Softbank, MediaTek Inc., Intel Corporation | imported from 3GU |
R2‑1909914 | Introduction of UDC in NR | CATT, CMCC, China Telecom, Huawei, HiSilicon, China Unicom, CAICT, Softbank, MediaTek Inc., Intel Corporation | imported from 3GU |
R2‑1909915 | Introduction of UDC in NR | CATT, CMCC, China Telecom, Huawei, HiSilicon, China Unicom, CAICT, Softbank, MediaTek Inc., Intel Corporation | imported from 3GU |
R2‑1909916 | Introduction of UDC in NR | CATT, CMCC, China Telecom, Huawei, HiSilicon, China Unicom, CAICT, Softbank, MediaTek Inc., Intel Corporation | imported from 3GU |
R2‑1909917 | Introduction of UDC in NR | CATT, CMCC, China Telecom, Huawei, HiSilicon, China Unicom, CAICT, Softbank, MediaTek Inc., Intel Corporation | imported from 3GU |
R2‑1909918 | Introduction of UDC in NR | CATT, CMCC, China Telecom, Huawei, HiSilicon, China Unicom, CAICT, Softbank, MediaTek Inc., Intel Corporation | imported from 3GU |
R2‑1909919 | RAN Spec Impact Analysis for RACS Feature | CATT, MediaTek Inc. | imported from 3GU |
R2‑1909920 | Draft LS on gNB/eNBs Supporting the RACS Feature | CATT | imported from 3GU |
R2‑1909921 | Consideration on Delta Signaling for ID-based Solution | CATT | imported from 3GU |
R2‑1909922 | SI acquisition for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909923 | Use of range parameter | MediaTek Inc. | imported from 3GU |
R2‑1909924 | RLF in sidelink | MediaTek Inc. | imported from 3GU |
R2‑1909925 | Remaining issues in SDAP layer | MediaTek Inc. | imported from 3GU |
R2‑1909926 | Inter-RAT BSR | MediaTek Inc. | imported from 3GU |
R2‑1909927 | Admission control for NR V2X | MediaTek Inc. | imported from 3GU |
R2‑1909928 | UE capability for MDT support | vivo | imported from 3GU |
R2‑1909929 | UE reporting for mobility optimization | vivo | imported from 3GU |
R2‑1909930 | HARQ use in 2-step RA | Ericsson | imported from 3GU |
R2‑1909931 | 2-step RA for BFR | Ericsson | imported from 3GU |
R2‑1909932 | New RAR formats for 2-step RA | Ericsson | imported from 3GU |
R2‑1909933 | RNTIs for 2-step RA | Ericsson | imported from 3GU |
R2‑1909934 | Fallback for 2-step RA | Ericsson | imported from 3GU |
R2‑1909935 | Back-off for 2-step RA | Ericsson | imported from 3GU |
R2‑1909936 | Configuration of 2-step RA | Ericsson | imported from 3GU |
R2‑1909937 | Selection of 2 or 4-step RA | Ericsson | imported from 3GU |
R2‑1909938 | PUSCH selection and Support of larger MsgA payload in 2-step RA | Ericsson | imported from 3GU |
R2‑1909939 | 106#55_IIoT_Network_control_of_PDCP_duplication_enhancements | Ericsson (Rapporteur) | imported from 3GU |
R2‑1909940 | Editorial/ minor corrections collected by Rapporteur | Samsung Telecommunications | imported from 3GU |
R2‑1909941 | CHO configuration/ execution, general aspects still remaining | Samsung Telecommunications | imported from 3GU |
R2‑1909942 | CHO configuration, condition related aspects still remaining | Samsung Telecommunications | imported from 3GU |
R2‑1909943 | Introduction of CHO | Samsung Telecommunications | imported from 3GU |
R2‑1909944 | Introduction of CHO | Samsung Telecommunications | imported from 3GU |
R2‑1909945 | CA/ DC enhancements, signalling reduction | Samsung Telecommunications | imported from 3GU |
R2‑1909946 | Immediate MDT, inter-node aspects | Samsung Telecommunications | imported from 3GU |
R2‑1909947 | Logged MDT, inter-node aspects (SN configuration) | Samsung Telecommunications | imported from 3GU |
R2‑1909948 | Logged MDT for early measurments | Samsung Telecommunications | imported from 3GU |
R2‑1909949 | Immediate MDT for early measurments | Samsung Telecommunications | imported from 3GU |
R2‑1909950 | Configuration of early measurments by SN | Samsung Telecommunications | imported from 3GU |
R2‑1909951 | Review outcome e-mail on early measurement configuration (36) | Samsung Telecommunications | imported from 3GU |
R2‑1909952 | Review outcome e-mail on early measurement procedures (37) | Samsung Telecommunications | imported from 3GU |
R2‑1909953 | Further clarification regarding handling of lists other than toAddModList | Samsung Telecommunications | imported from 3GU |
R2‑1909954 | General framework for transfer of UE information | Samsung Telecommunications | imported from 3GU |
R2‑1909955 | Msg1 transmission opportunities | ITRI | imported from 3GU |
R2‑1909956 | Detection of consistent LBT failures | ITRI | imported from 3GU |
R2‑1909957 | Discussion on the paging opportunities overlapping for the NR-U | ITRI | imported from 3GU |
R2‑1909958 | Discussion on DRX in NTN | ITRI | imported from 3GU |
R2‑1909959 | Discussion on IAB CP and UP bearer mapping | ITRI | imported from 3GU |
R2‑1909960 | Backhaul RLF handling | ITRI | imported from 3GU |
R2‑1909961 | Clarification on selectedBandCombinationNR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909962 | Clarification about setting the SMTC in NSA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909963 | Clarification about setting the SMTC in NSA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909964 | Clarification about setting the SMTC in NSA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909965 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909966 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909967 | Clarification on selectedBandCombinationNR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909968 | How to differentiate PSCell change and Initial Access in NSA over F1 interface | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909969 | Draft LS to RAN3 to inform RAN2 agreement how to differentiate PSCell change and Initial Access in NSA over F1 interface | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909970 | Inter Node Message impacts due to intra-band EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909971 | Inter Node Message impacts due to intra-band EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909972 | Inter Node Message impacts due to intra-band EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909973 | Clarification about setting the SMTC in NSA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909974 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909975 | UE Capability ID list in HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909976 | Draft LS to RAN3 with agreement for UE Capability ID list in HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909977 | Suspension of SCG | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909978 | RRC Resume via. SCG | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1909979 | P-Max applicable in FR2 | Ericsson | imported from 3GU |
R2‑1909980 | Correction for Pcompensation in FR2 | Ericsson | imported from 3GU |
R2‑1909981 | Correction for P-Max in FR2 | Ericsson | imported from 3GU |
R2‑1909982 | Correction to the NEED codes in SIB2 | Ericsson | imported from 3GU |
R2‑1909983 | RAN2 impact of WUS in connected mode | Ericsson | imported from 3GU |
R2‑1909984 | Relaxed inter-frequency measurements in spotty coverage | Ericsson | imported from 3GU |
R2‑1909985 | Release Assistance Indication signalling | Ericsson | imported from 3GU |
R2‑1909986 | RRM measurement relaxation | Ericsson | imported from 3GU |
R2‑1909987 | UE adaptation to maximum number of MIMO layers | Ericsson | imported from 3GU |
R2‑1909988 | UE Assistance Information for Power Preference Indication | Ericsson | imported from 3GU |
R2‑1909989 | UE Assistance Information for UE preferred BWP configuration | Ericsson | imported from 3GU |
R2‑1909990 | UE Assistance Information for UE preferred cDRX configuration | Ericsson | imported from 3GU |
R2‑1909991 | UE Assistance Information for UE preferred SCell configuration | Ericsson | imported from 3GU |
R2‑1909992 | UE preferred RRC state after connection release | Ericsson | imported from 3GU |
R2‑1909993 | On PDU overwritten in NR-U configured grant | Fujitsu | imported from 3GU |
R2‑1909994 | Additional paging opportunities for NR-U | Fujitsu | imported from 3GU |
R2‑1909995 | Discussion on sidelink SR trigger | Fujitsu | imported from 3GU |
R2‑1909996 | RLM/RLF for unicast in NR V2X | Fujitsu | imported from 3GU |
R2‑1909997 | Aspects on msgB in 2-step RACH | Fujitsu | imported from 3GU |
R2‑1909998 | Discussion on backoff indication in 2-step RACH | Fujitsu | imported from 3GU |
R2‑1909999 | SR_COUNTER initialization due to RRC reconfiguration | Fujitsu, LG Electronics Inc. | imported from 3GU |
R2‑1910000 | Ethernet MAC header compression | vivo | imported from 3GU |
R2‑1910001 | Discussion on the parallel compression of ROHC and EHC | vivo | imported from 3GU |
R2‑1910002 | Consideration on efficient duplication at SCell failure | vivo | imported from 3GU |
R2‑1910003 | Discussion on the SR cancellation and collision with MAC CE | vivo | imported from 3GU |
R2‑1910004 | LCID restriction due to PDCP duplication | vivo | imported from 3GU |
R2‑1910005 | Activation and deactivation of multiple SPS and CG | vivo | imported from 3GU |
R2‑1910006 | Discussion on the periodicity misalignment between TSC traffic and SPS/CG | vivo | imported from 3GU |
R2‑1910007 | Discussion on the LCP enhancement for supporting TSC traffic | vivo | imported from 3GU |
R2‑1910008 | Configuration details of multiple SPS and CG | vivo | imported from 3GU |
R2‑1910009 | URLLC transmission within measurement gap | vivo | imported from 3GU |
R2‑1910010 | SPS and CG configuration issue on the partial overlapping TSN traffic pattern | vivo | imported from 3GU |
R2‑1910011 | Discussion on the SNPN and CAG related parameters broadcast by RAN | vivo | imported from 3GU |
R2‑1910012 | Discussion on CAG and SNPN cell (re)selection | vivo | imported from 3GU |
R2‑1910013 | Discussion on CAG and SNPN cell access control | vivo | imported from 3GU |
R2‑1910014 | Consideration on mobility control of connected UE for CAG | vivo | imported from 3GU |
R2‑1910015 | Scheduling enhancements for TSC network | OPPO | imported from 3GU |
R2‑1910016 | Discussion on confirmation MAC CE for TSC network | OPPO | imported from 3GU |
R2‑1910017 | Discussion on Ethernet header compression | OPPO | imported from 3GU |
R2‑1910018 | Intra-UE prioritization between SR and PUSCH | OPPO | imported from 3GU |
R2‑1910019 | Draft LS on intra-UE prioritization for SR and PUSCH | OPPO | imported from 3GU |
R2‑1910020 | Intra-UE prioritization involving configured grant | OPPO | imported from 3GU |
R2‑1910021 | Other issue on intra-UE prioritization for IIoT | OPPO | imported from 3GU |
R2‑1910022 | Discussion on SR cancelling on intra-UE prioritization involving SR | OPPO | imported from 3GU |
R2‑1910023 | Discussion on data duplication enhancement in IIoT | OPPO | imported from 3GU |
R2‑1910024 | Discussion on UE-based data duplication enhancement | OPPO | imported from 3GU |
R2‑1910025 | Intra-UE prioritization between multiple SRs | OPPO | imported from 3GU |
R2‑1910026 | Draft LS on intra-UE prioritization for multiple SRs | OPPO | imported from 3GU |
R2‑1910027 | Discussion on potential improvements for delay critical QoS Flows | OPPO | imported from 3GU |
R2‑1910028 | Report on email discussion [106#46][IAB]: Low-latency scheduling | Samsung Electronics GmbH | imported from 3GU |
R2‑1910029 | On the topic of RLF/RLM declaration in SL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910030 | Remaining issues with pre-emptive BSR | Samsung Electronics GmbH | imported from 3GU |
R2‑1910031 | Discussion on SL radio link management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910032 | FDD and TDD Timing Alignment for Dual Connectivity | VODAFONE Group Plc | imported from 3GU |
R2‑1910033 | Segmentation of UE radio capability signalling | Nokia Italy | imported from 3GU |
R2‑1910034 | On the use of DC in IAB networks and simultaneous transmission from multiple parents – proposal for LS to RAN1 | Samsung Electronics GmbH | imported from 3GU |
R2‑1910035 | [Draft] LS to RAN1 on simultaneous communication with multiple parent nodes in IAB | Samsung Electronics GmbH | imported from 3GU |
R2‑1910036 | Draft LS to RAN1 on NR V2X cross-RAT configuration | CATT | imported from 3GU |
R2‑1910037 | Left issues for SR and BSR | OPPO | imported from 3GU |
R2‑1910038 | BAP layer modelling and configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910039 | Further details of BAP header and routing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910040 | Next IAB hop identification | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910041 | F1AP signalling over RRC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910042 | IAB support indication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910043 | BH link failure handling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910044 | Signalling for radio aware scheduling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910045 | Discussion on MAC subheader structures for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910046 | Correction to s-Measure for NE-DC (36.331) | Ericsson | imported from 3GU |
R2‑1910047 | Correction of field descriptions in UE-CapabilityRequestFilterCommon (38.331) | Ericsson | imported from 3GU |
R2‑1910048 | Clarification of ca-ParametersNR-forDC (38.331) | Ericsson | imported from 3GU |
R2‑1910049 | Support of NR to E-UTRA handover with dual connectivity | Ericsson | imported from 3GU |
R2‑1910050 | Support of handover between NR and EN-DC (37.340) | Ericsson | imported from 3GU |
R2‑1910051 | Support of handover between NR-DC and E-UTRA (37.340) | Ericsson | imported from 3GU |
R2‑1910052 | Setup of EN-DC during inter-RAT handover to E-UTRA (36.331) | Ericsson | imported from 3GU |
R2‑1910053 | Use of group signaling for NR-CA | Ericsson | imported from 3GU |
R2‑1910054 | Returning multiple BC+FS in CG-Config | Ericsson | imported from 3GU |
R2‑1910055 | Determining L2 buffer size | Ericsson | imported from 3GU |
R2‑1910056 | Introducing multiple BC-FS and L1 Data Rate to INM | Ericsson | imported from 3GU |
R2‑1910057 | [DRAFT] LS on providing L2 buffer size in inter-node messages | Ericsson | imported from 3GU |
R2‑1910058 | Clarify the application of powerClass14dBm-Offset | Huawei, HiSilicon | imported from 3GU |
R2‑1910059 | Report of email discussion [106#66][R16 eMTC] Quality report in Msg3 | Huawei, HiSilicon | imported from 3GU |
R2‑1910060 | Draft LS on the aperiodic DL quality report in connected mode | Huawei, HiSilicon | imported from 3GU |
R2‑1910061 | Remaining issues of DL quality report in connected mode | Huawei, HiSilicon | imported from 3GU |
R2‑1910062 | Remaining issues of DL quality report in Msg3 in IDLE mode | Huawei, HiSilicon | imported from 3GU |
R2‑1910063 | MAC CE design for DL quality report | Huawei, HiSilicon | imported from 3GU |
R2‑1910064 | MPDCCH performance improvement using CRS | Huawei, HiSilicon | imported from 3GU |
R2‑1910065 | Enhancements to idle mode mobility for non-BL UEs | Huawei, HiSilicon | imported from 3GU |
R2‑1910066 | Draft LS on the ETWS/CMAS notification in connected mode | Huawei, HiSilicon | imported from 3GU |
R2‑1910067 | Use of LTE Control Channel Region for DL transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910068 | TP for the use of LTE Control Channel Region for DL transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910069 | Relaxation of RRM measurements using WUS | Huawei, HiSilicon | imported from 3GU |
R2‑1910070 | Use of RSS for measurement improvements | Huawei, HiSilicon | imported from 3GU |
R2‑1910071 | TP for signaling reducing of RSS parameters | Huawei, HiSilicon | imported from 3GU |
R2‑1910072 | On the need for bearer ID in the BAP header | Samsung Electronics GmbH | imported from 3GU |
R2‑1910073 | Propagation Delay Compensation by the gNB | MediaTek Inc. | imported from 3GU |
R2‑1910074 | Misalignment between TSC and SPS/CG periodicities | MediaTek Inc. | imported from 3GU |
R2‑1910075 | Ethernet Header Compression Message Format | MediaTek Inc. | imported from 3GU |
R2‑1910076 | On the framework for UL intra-UE prioritisation | MediaTek Inc. | imported from 3GU |
R2‑1910077 | Remaining issues on configured grant retransmission timer | MediaTek Inc. | imported from 3GU |
R2‑1910078 | MAC behaviour for LBT failures in Msg3 transmissions | MediaTek Inc. | imported from 3GU |
R2‑1910079 | On PHR and autonomous retransmissions | MediaTek Inc. | imported from 3GU |
R2‑1910080 | Extended ra-ResponseWindow and RA-RNTI calculation | MediaTek Inc. | imported from 3GU |
R2‑1910081 | MsgB format for 2-step RACH | MediaTek Inc. | imported from 3GU |
R2‑1910082 | On contention resolution in 2-step RACH | MediaTek Inc. | imported from 3GU |
R2‑1910083 | UE assistance information for power saving | MediaTek Inc. | imported from 3GU |
R2‑1910084 | On maximum number of MIMO layers | MediaTek Inc. | imported from 3GU |
R2‑1910085 | Interaction between power saving signal and DRX | MediaTek Inc. | imported from 3GU |
R2‑1910086 | SL HARQ operation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910087 | SR trigger for NR SL | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910088 | SL LCP procedure considering MCR requirements | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910089 | SL HARQ buffer Management | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910090 | Impact of LBT on power headroom reporting functionality | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910091 | Consistent LBT failure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910092 | Multiple configured grants for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910093 | CAPC for configured grant | Nokia, Nokia Shanghai Bell, Lenovo | imported from 3GU |
R2‑1910094 | CAPC for dynamic grant with COT sharing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910095 | 2 step RACH overload control | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910096 | Options for path identifier in IAB | Samsung Electronics GmbH | imported from 3GU |
R2‑1910097 | MAC PDU overriding issue for AUL/CG transmission | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910098 | Further details of the RACH procedure for NR-U | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910099 | Impact of systematic LBT failure on UL transmission procedure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910100 | Consideration on UE capability ID transmission via RRC message | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910101 | Introduction of UECapabilityInformation segmentation in TS38.331 | ZTE corporation, Sanechips, China Southern Power Grid Co., Ltd, MediaTek Inc, CATT, Ericsson, Intel Corporation,Spreadtrum Communications | imported from 3GU |
R2‑1910102 | Signaling of efficient state transition out of RRC_CONNECTED | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910103 | Further consideration on UE assistance information for power saving | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910104 | Details of Selective Duplication Procedure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910105 | Cell restriction for CA duplication | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910106 | Criteria on RACH type selection | OPPO | imported from 3GU |
R2‑1910107 | Correction of condition for security algorithms at inter-RAT handover to LTE-5GC (Alt2) | Ericsson | imported from 3GU |
R2‑1910108 | Clarification on defaultDRB | Ericsson | imported from 3GU |
R2‑1910109 | Correction on reestablishRLC | Ericsson | imported from 3GU |
R2‑1910110 | Clarification of handover terminology | Ericsson, ZTE Corporation (Rapporteur), Huawei | imported from 3GU |
R2‑1910111 | Correction of condition for security algorithms at inter-RAT handover to LTE-5GC (Alt1) | Ericsson | imported from 3GU |
R2‑1910112 | Correction on CCCH default values | Ericsson | imported from 3GU |
R2‑1910113 | Correction on SFTD measurement configuration | Ericsson | imported from 3GU |
R2‑1910114 | Correction on AS security | Ericsson | imported from 3GU |
R2‑1910115 | Correction of waitTime in RRCReject | Ericsson | imported from 3GU |
R2‑1910116 | Correction on measurement report triggering | Ericsson | imported from 3GU |
R2‑1910117 | Correction on quantity configuration in MR-DC | Ericsson | imported from 3GU |
R2‑1910118 | ue-TimersAndConstants handling in SpCell configuration | Ericsson | imported from 3GU |
R2‑1910119 | Handling of embedded RRC message in RRCReconfiguration procedure | Ericsson | imported from 3GU |
R2‑1910120 | Adding P-EUTRA for supporting power coordination in NE-DC | Ericsson | imported from 3GU |
R2‑1910121 | Measurements handling in SCGFailureInformation(EUTRA) | Ericsson | imported from 3GU |
R2‑1910122 | Corrections on FailureInformation message | Ericsson | imported from 3GU |
R2‑1910123 | Corrections on maxMeasIdentitiesSCG-NR in MR-DC | Ericsson | imported from 3GU |
R2‑1910124 | Need of maxMeasIdentitiesSCG-NR in MR-DC | Ericsson | imported from 3GU |
R2‑1910125 | Discussion regarding on-demand SI procedure (Alt2) | Ericsson | imported from 3GU |
R2‑1910126 | Discussion regarding on-demand SI procedure (Alt1) | Ericsson | imported from 3GU |
R2‑1910127 | Discussion regarding on-demand SI procedure | Ericsson | imported from 3GU |
R2‑1910128 | Discussion on the content of SidelinkUEInformation message | Ericsson | imported from 3GU |
R2‑1910129 | Discussion on SL UE report(s) | Ericsson | imported from 3GU |
R2‑1910130 | Discussion on SR and BSR in sidelink | Ericsson | imported from 3GU |
R2‑1910131 | Running CR for 38.322 for NR V2X | Ericsson | imported from 3GU |
R2‑1910132 | Discussion on SL AS configuration handling over NR Uu | Ericsson | imported from 3GU |
R2‑1910133 | RLF handling in sidelink | Ericsson | imported from 3GU |
R2‑1910134 | Handling of capability transfer in sidelink | Ericsson | imported from 3GU |
R2‑1910135 | Handling of SL in Uu RRC state transitions | Ericsson | imported from 3GU |
R2‑1910136 | On demand SIB in sidelink | Ericsson | imported from 3GU |
R2‑1910137 | SL handling during handover in NR | Ericsson | imported from 3GU |
R2‑1910138 | Left issues for configured sidelink grant | Ericsson | imported from 3GU |
R2‑1910139 | Discussion on SL measurements reporting | Ericsson | imported from 3GU |
R2‑1910140 | Cell reselection for NR V2X | Ericsson | imported from 3GU |
R2‑1910141 | Discussion on NR V2X in MR-DC scenarios | Ericsson | imported from 3GU |
R2‑1910142 | Overview of RAN2 work for Rel-16 MIMO WI | Ericsson | imported from 3GU |
R2‑1910143 | Protocol structure for Multi-TRP operation | Ericsson | imported from 3GU |
R2‑1910144 | MAC CE for DCI referring to more than one TCI state | Ericsson | imported from 3GU |
R2‑1910145 | RAN2 aspects of multi-beam enhancements | Ericsson | imported from 3GU |
R2‑1910146 | Correction to the description of DL channel quality | Huawei, HiSilicon | imported from 3GU |
R2‑1910147 | Correction to the description of DL channel quality | Huawei, HiSilicon | imported from 3GU |
R2‑1910148 | Introduction of DL channel quality reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1910149 | Introduction of DL channel quality reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1910150 | Discussion on valid combinations for mixed operation mode | Huawei, HiSilicon | imported from 3GU |
R2‑1910151 | Corrections to paging and random access in mixed operation mode | Huawei, HiSilicon | imported from 3GU |
R2‑1910152 | Correction to table references for SIB1 scheduling in TDD | Huawei, HiSilicon | imported from 3GU |
R2‑1910153 | Introduction of UE specific DRX for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1910154 | Introduction of UE specific DRX for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1910155 | Introduction of UE specific DRX for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1910156 | Introduction of UE specific DRX for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1910157 | [Draft] LS on UE specific DRX in NB-IoT | Huawei | imported from 3GU |
R2‑1910158 | Clarification that E-UTRAN configures WUS parameters so that WUS does not impact MME paging | Huawei, HiSilicon | imported from 3GU |
R2‑1910159 | Correction to the field description of numDRX-CyclesRelaxed in WUS-Config-NB | Huawei, HiSilicon | imported from 3GU |
R2‑1910160 | Introduction of additional enhancements for NB-IoT | Huawei | imported from 3GU |
R2‑1910161 | Introduction of additional enhancements for NB-IoT in TS 36.331 | Huawei | imported from 3GU |
R2‑1910162 | Report of Email discussion [106#62][NB-IoT R16] SON/ANR | Huawei | imported from 3GU |
R2‑1910163 | Text Proposal for Email discussion [106#62][NB-IoT R16] SON/ANR | Huawei | imported from 3GU |
R2‑1910164 | Discussion on SON remaining open issues | Huawei, HiSilicon | imported from 3GU |
R2‑1910165 | DL channel quality reporting in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1910166 | [DRAFT] Reply LS on channel quality report in connected mode for NB-IoT | Huawei | imported from 3GU |
R2‑1910167 | RRM measurements on non-anchor carrier | Huawei, HiSilicon | imported from 3GU |
R2‑1910168 | Discussion on MT-EDT options | Huawei, HiSilicon | imported from 3GU |
R2‑1910169 | Overall procedure for Msg2 based option | Huawei, HiSilicon | imported from 3GU |
R2‑1910170 | [Draft] LS on Msg2 based MT-EDT | Huawei | imported from 3GU |
R2‑1910171 | [Draft] LS on Msg2 based MT-EDT for the CP solution | Huawei | imported from 3GU |
R2‑1910172 | Overall procedure for Msg4 based option | Huawei, HiSilicon | imported from 3GU |
R2‑1910173 | Report of email discussion [106#59][R16 NB-IoT/eMTC] D-PUR Procedural steps | Huawei | imported from 3GU |
R2‑1910174 | Handling of D-PUR configuration for CP solution | Huawei, HiSilicon | imported from 3GU |
R2‑1910175 | [Draft] LS on handling of D-PUR configuration for the CP solution | Huawei | imported from 3GU |
R2‑1910176 | Remaining open issues on D-PUR configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910177 | Discussion on reply LS from SA2 on GWUS | Huawei, HiSilicon | imported from 3GU |
R2‑1910178 | [Draft] Reply LS on assistance indication for WUS | Huawei | imported from 3GU |
R2‑1910179 | DRX timers in multiple TBs scheduling of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1910180 | Impact to support user plane optimisations for eMTC and NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1910181 | Support of RRC connection Re-establishment for the Control plane for NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1910182 | AS RAI for eMTC and NB-IoT connection to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1910183 | Discussion on support of RRC_INACTIVE for eMTC connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1910184 | Support of Slicing and 5G QoS framework for NB-IoT and eMTC connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1910185 | LTE-M indication in 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1910186 | Egress link identification | Samsung Electronics GmbH | imported from 3GU |
R2‑1910187 | Positioning protocol adjustments | Fraunhofer IIS | imported from 3GU |
R2‑1910188 | NR DL and UL positioning: RTT procedure | Fraunhofer IIS | imported from 3GU |
R2‑1910189 | UE-based RSRP positioning | Fraunhofer IIS | imported from 3GU |
R2‑1910190 | Some considerations on LCID space extension | Samsung Electronics GmbH | imported from 3GU |
R2‑1910191 | Handling UE capabilities before AS security activation | Huawei, HiSilicon | imported from 3GU |
R2‑1910192 | CR to TS 38.331 on handling UE capabilities before AS security activation | Huawei, HiSilicon | imported from 3GU |
R2‑1910193 | CR to TS 36.331 on handling UE capabilities before AS security activation | Huawei, HiSilicon | imported from 3GU |
R2‑1910194 | Clarification on RAN2 impact to support DL HARQ timing for dual UL EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910195 | Draft CR to 36.331 on TDM pattern for dual UL EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910196 | Draft CR to 38.306 on TDM pattern for dual UL EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910197 | Further details on LCID space extension | Samsung Electronics GmbH | imported from 3GU |
R2‑1910198 | Prioritization between SCG UL and SL | Apple | imported from 3GU |
R2‑1910199 | SL RLF handling | Apple | imported from 3GU |
R2‑1910200 | PC5 RRC procedure | Apple | imported from 3GU |
R2‑1910201 | Discussion on SDAP header | Apple | imported from 3GU |
R2‑1910202 | Prioritization between UL BSR and SL BSR | Apple | imported from 3GU |
R2‑1910203 | Use of exceptional pool | Apple | imported from 3GU |
R2‑1910204 | Maximum Data Rate Enumeration for UP Integrity Protection | Apple | imported from 3GU |
R2‑1910205 | Draft LS on Maximum Data Rate Enumeration for UP Integrity Protection | Apple | imported from 3GU |
R2‑1910206 | SI Acquisition in Connected Mode | Apple | imported from 3GU |
R2‑1910207 | CMAS/ETWS Reception at MTC UE Configured with eDRX | Apple | imported from 3GU |
R2‑1910208 | Fast Repetition Adjustment in MTC CE Mode | Apple | imported from 3GU |
R2‑1910209 | Intra UE NSA and SA Co-existence | Apple | imported from 3GU |
R2‑1910210 | An Analysis of QoS Upgrading and Downgrading related to incoming LS in S2-1908627 on V2X Uu QoS | VODAFONE Group Plc | imported from 3GU |
R2‑1910211 | Remaining issues on sidelink configured grant | vivo | imported from 3GU |
R2‑1910212 | Discussion on sideink radio link management on TX and RX UE | vivo | imported from 3GU |
R2‑1910213 | Remaining issues on PC5-RRC message exchange | vivo | imported from 3GU |
R2‑1910214 | Open issues for Sidelink link failure and release | vivo | imported from 3GU |
R2‑1910215 | Uplink and Sidelink transmission prioritization in NR V2X | vivo | imported from 3GU |
R2‑1910216 | Tx and Rx resource pool definition for NR V2X Sidelink | vivo | imported from 3GU |
R2‑1910217 | PC5 SDAP protocol in NR V2X | vivo | imported from 3GU |
R2‑1910218 | PC5 RATs prioritization in NR V2X | vivo | imported from 3GU |
R2‑1910219 | Draft LS to SA2 on PC5 RATs prioritization in NR V2X | vivo | imported from 3GU |
R2‑1910220 | Congestion control in NR V2X | vivo | imported from 3GU |
R2‑1910221 | Mode switch for QoS guarantee in NR V2X | vivo | imported from 3GU |
R2‑1910222 | Discussion on support of simultaneous mode 1 and mode 2 | vivo | imported from 3GU |
R2‑1910223 | Report of [106#83] [NR/V2X] PDCP (vivo) | vivo | imported from 3GU |
R2‑1910224 | UE ID across multiple PC5-S links | vivo | imported from 3GU |
R2‑1910225 | Remaining issues on LCP restriction and configuration | vivo | imported from 3GU |
R2‑1910226 | Remaining issues about NR SL QoS handling | vivo | imported from 3GU |
R2‑1910227 | Discussion on Truncated Sidelink BSR | vivo | imported from 3GU |
R2‑1910228 | Clarification to dynamic power sharing capability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910229 | Discussion on sidelink configured grant | LG Electronics | imported from 3GU |
R2‑1910230 | Discussion on PC5 RRC connection | LG Electronics | imported from 3GU |
R2‑1910231 | Remaining issues on PC5 RLM | LG Electronics | imported from 3GU |
R2‑1910232 | UE operation upon NR Uu Beam Failure | LG Electronics | imported from 3GU |
R2‑1910233 | UE operation upon PC5 RLF declaration | LG Electronics | imported from 3GU |
R2‑1910234 | correction on SUO case 1 for NE-DC | Huawei, Hisilicon | imported from 3GU |
R2‑1910235 | correction on Tx DC location | Huawei, Hisilicon | imported from 3GU |
R2‑1910236 | Reply LS on Tx DC location | Huawei, Hisilicon | imported from 3GU |
R2‑1910237 | DRX considerations for preconfigured resources | Sequans Communications | imported from 3GU |
R2‑1910238 | Running CR for 38.331 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1910239 | Running CR for 36.331 for CA&DC enh. | Ericsson | imported from 3GU |
R2‑1910240 | Running CR for 36.300 on CA/DC | Ericsson | imported from 3GU |
R2‑1910241 | Running CR for 38.300 for CA&DC enh. | Ericsson | imported from 3GU |
R2‑1910242 | NR-DC power control | Ericsson | imported from 3GU |
R2‑1910243 | idle measurement configuration in UE Inactive AS context | Ericsson | imported from 3GU |
R2‑1910244 | Handling of early measurement results | Ericsson | imported from 3GU |
R2‑1910245 | Quantized early measurement report | Ericsson | imported from 3GU |
R2‑1910246 | Granular early measurement request | Ericsson | imported from 3GU |
R2‑1910247 | Early meas config /result handling during autonomous transition to IDLE | Ericsson | imported from 3GU |
R2‑1910248 | Signalling of ealy measurements with Resume Request | Ericsson | imported from 3GU |
R2‑1910249 | interoperability of msg5 based solution and legacy (UE information Request/response) in connection resumption | Ericsson | imported from 3GU |
R2‑1910250 | Early measurement signalling enhancements for LTE | Ericsson | imported from 3GU |
R2‑1910251 | Handling of idle/inactive measurements during inter-RAT cell reselection | Ericsson | imported from 3GU |
R2‑1910252 | Reporting early measurements before RRC Resume | Ericsson | imported from 3GU |
R2‑1910253 | Capabilities for idle/inactive measurements | Ericsson | imported from 3GU |
R2‑1910254 | Carrier selection for quick setup of DC or CA | Ericsson | imported from 3GU |
R2‑1910255 | Early measurement use cases | Ericsson | imported from 3GU |
R2‑1910256 | On Resuming Connected mode Measurements | Ericsson | imported from 3GU |
R2‑1910257 | SCell state in Resume | Ericsson | imported from 3GU |
R2‑1910258 | Conditional SCell state determination using early measurements | Ericsson | imported from 3GU |
R2‑1910259 | Configuring or resuming MCG SCells during connection resume (38.331) | Ericsson | imported from 3GU |
R2‑1910260 | Configuring or resuming MCG SCells during connection resume (36.331) | Ericsson | imported from 3GU |
R2‑1910261 | Configuring or resuming (NG)EN-DC during connection resume (36.331) | Ericsson | imported from 3GU |
R2‑1910262 | Configuring or resuming NR-DC or NE-DC during connection resume (38.331) | Ericsson | imported from 3GU |
R2‑1910263 | Conditional SCG resume | Ericsson | imported from 3GU |
R2‑1910264 | Connection resumption at the SN | Ericsson | imported from 3GU |
R2‑1910265 | Multiple inactive SCG configurations | Ericsson | imported from 3GU |
R2‑1910266 | Independent handling of SCG resume suspend | Ericsson | imported from 3GU |
R2‑1910267 | Handover at Resume | Ericsson | imported from 3GU |
R2‑1910268 | Release and add of MCG in MR-DC | Ericsson | imported from 3GU |
R2‑1910269 | SRB primary path handling for MR-DC | Ericsson, Interdigital | imported from 3GU |
R2‑1910270 | UL path switch in case of failure in MR-DC (37.340) | Ericsson | imported from 3GU |
R2‑1910271 | Primary path for SRBs (38.331) | Ericsson | imported from 3GU |
R2‑1910272 | UL path switch in case of failure in (NG)EN-DC (36.331) | Ericsson | imported from 3GU |
R2‑1910273 | Fast MCG recovery via SCells of MCG | Ericsson | imported from 3GU |
R2‑1910274 | Fast MCG recovery via SCells of MCG (38.331) | Ericsson | imported from 3GU |
R2‑1910275 | Measurements handling in MCGFailureInformation (36.331) | Ericsson | imported from 3GU |
R2‑1910276 | Measurement handling in MCGFailureInformation (38.331) | Ericsson | imported from 3GU |
R2‑1910277 | Necessity of timeout timer for fast MCG recovery | Ericsson | imported from 3GU |
R2‑1910278 | Fast MCG recovery via SRB3 | Ericsson | imported from 3GU |
R2‑1910279 | Fast MCG recovery via SUL | Ericsson | imported from 3GU |
R2‑1910280 | Fast MCG recovery via SUL (38.331) | Ericsson | imported from 3GU |
R2‑1910281 | Measurements for Scell failure report | Ericsson | imported from 3GU |
R2‑1910282 | Measurements for Scell failure report (38.331) | Ericsson | imported from 3GU |
R2‑1910283 | Remaining issue for prioritization for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910284 | SDU type in PDCP header | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910285 | Remaining issue for SL SR cancellation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910286 | Discussion on PC5 RRC state | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910287 | AS level link management for NR V2X unicast | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910288 | Further discussion on scheduling enhancement for TSN traffic | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910289 | Discussion on QoS management for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910290 | Summary of email discussion_106_37_UE behavior regarding idle measurement configurations and measurement results | Ericsson | imported from 3GU |
R2‑1910291 | Summary of email discussion _106_38_SCG and MCG SCell Configuration with RRC Resume | Ericsson | imported from 3GU |
R2‑1910292 | SLRB configuration for NR V2X UE | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910293 | Consideration on ANR measurement reporting in NB-IOT | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910294 | Consideration on paging probability based UE grouping | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910295 | Summary of RAN2 106 #82 email discussion V2X RLC | Ericsson | imported from 3GU |
R2‑1910296 | On support of HARQ procedure over sidelink | Ericsson | imported from 3GU |
R2‑1910297 | On support of sidelink CSI report | Ericsson | imported from 3GU |
R2‑1910298 | Discussion on SL RLC AM support | Ericsson | imported from 3GU |
R2‑1910299 | Coordination for HARQ feedback in groupcast | Ericsson | imported from 3GU |
R2‑1910300 | Discussion on Resource Pool | Ericsson | imported from 3GU |
R2‑1910301 | On Resource Reservation in Mode 2 Resoruce Allocation | Ericsson | imported from 3GU |
R2‑1910302 | Resource configuration per validity area | Ericsson | imported from 3GU |
R2‑1910303 | On SL unicast link related procedure | Ericsson | imported from 3GU |
R2‑1910304 | Discussion on SL RLM RLF mechanism | Ericsson | imported from 3GU |
R2‑1910305 | Admission control for NR SL | Ericsson, InterDigital, MediaTek, CATT, ITL, Xiaomi, Fraunhofer | imported from 3GU |
R2‑1910306 | On the need of SDAP header | Ericsson | imported from 3GU |
R2‑1910307 | Criteria to establish and release SL QoS flow and radio bearer | Ericsson | imported from 3GU |
R2‑1910308 | On the sidelink QoS flow and radio bearer | Ericsson | imported from 3GU |
R2‑1910309 | Use of communication range at AS | Ericsson | imported from 3GU |
R2‑1910310 | Congestion control and starvation avoidance | Ericsson | imported from 3GU |
R2‑1910311 | On PC5 Interface Availability | Ericsson | imported from 3GU |
R2‑1910312 | On inter-RAT scheduling | Ericsson | imported from 3GU |
R2‑1910313 | Simultaneous configuration of mode 1 and mode 2 | Ericsson | imported from 3GU |
R2‑1910314 | In-device LTE SL and NR SL coexistence | Ericsson | imported from 3GU |
R2‑1910315 | Consideration on Msg.2 based MT-EDT procedure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910316 | Consideration on MT-EDT procedure for UE | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910317 | Transport of MT’s own traffic | Huawei, HiSilicon, Ericsson, Samsung, LG Electronics Inc., CMCC | imported from 3GU |
R2‑1910318 | IAB node operating in SA mode in NSA network (option b) | Huawei, HiSilicon | imported from 3GU |
R2‑1910319 | IAB node operating in NSA mode in NSA scenarios (option c) | Huawei, HiSilicon | imported from 3GU |
R2‑1910320 | Discussion on the need of dedicated SIB for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1910321 | TP for the L2 structure on stage 2 specification | Huawei, HiSilicon | imported from 3GU |
R2‑1910322 | Remaining issues on the BAP modelling and specification organization | Huawei, HiSilicon | imported from 3GU |
R2‑1910323 | TP for the fundamental BAP functions | Huawei, HiSilicon | imported from 3GU |
R2‑1910324 | Basic routing functions for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1910325 | BAP routing ID design for IAB routing | Huawei, HiSilicon | imported from 3GU |
R2‑1910326 | Next hop ID design for IAB routing | Huawei, HiSilicon | imported from 3GU |
R2‑1910327 | [Draft] LS on destination address for routing | Huawei, HiSilicon | imported from 3GU |
R2‑1910328 | Bearer mapping in IAB network | Huawei, HiSilicon | imported from 3GU |
R2‑1910329 | Bearer mapping for other traffic | Huawei, HiSilicon | imported from 3GU |
R2‑1910330 | BAP layer buffer management | Huawei, HiSilicon | imported from 3GU |
R2‑1910331 | Report of email discussion [106#45][IAB] Lossless behaviour | Huawei, HiSilicon | imported from 3GU |
R2‑1910332 | The need to specify the uplink scheduling enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1910333 | LCID extension for IAB backhaul link | Huawei, HiSilicon | imported from 3GU |
R2‑1910334 | LCG space extension for IAB backhaul link | Huawei, HiSilicon | imported from 3GU |
R2‑1910335 | QoS and Fairness enforcement in IAB networks | Huawei, HiSilicon | imported from 3GU |
R2‑1910336 | Enhancement on the RACH configuration for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1910337 | General RLC impacts | Huawei, HiSilicon | imported from 3GU |
R2‑1910338 | Support of UE PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1910339 | Draft LS to RAN3 on UE PDCP Duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1910340 | Draft LS to RAN3 on E2E flow control | Huawei, HiSilicon | imported from 3GU |
R2‑1910341 | Routing and RLF handling for the IAB node connecting to multiple donor DUs | Huawei, HiSilicon | imported from 3GU |
R2‑1910342 | [Draft] LS on the multiple donor DUs scenario | Huawei, HiSilicon | imported from 3GU |
R2‑1910343 | Remaining issues of the backhaul RLF recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1910344 | Bearer mapping decision and configuration details | Huawei, HiSilicon | imported from 3GU |
R2‑1910345 | Routing table configuration details | Huawei, HiSilicon | imported from 3GU |
R2‑1910346 | BH RLC channel configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910347 | BAP configuration during IAB integration procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1910348 | IAB RRC Connection Establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1910349 | Cell Selection and Reselection of IAB node | Huawei, HiSilicon | imported from 3GU |
R2‑1910350 | Access Control for IAB MT | Huawei, HiSilicon | imported from 3GU |
R2‑1910351 | Congestion reporting and handling for IAB networks | Huawei, HiSilicon | imported from 3GU |
R2‑1910352 | RRC signaling structure for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1910353 | Overview of RAN1 impacts | Huawei, HiSilicon | imported from 3GU |
R2‑1910354 | Prioritized RACH for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1910355 | Intra-frequency DC for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1910356 | List of open issues on RRC for Rel-16 5G V2X with Sidelink | Huawei (Rapporteur) | imported from 3GU |
R2‑1910357 | BFR on SCell | Ericsson | imported from 3GU |
R2‑1910358 | Report buffer status with one padding byte | Google Inc. | imported from 3GU |
R2‑1910359 | Draft Skeleton of TS 38.340 for Backhaul Adaptation Protocol (BAP) | Huawei, HiSilicon | imported from 3GU |
R2‑1910360 | Work split between RAN1 and RAN2 on intra-UE prioritization and Multiplexing | Huawei, HiSilicon, SIA | imported from 3GU |
R2‑1910361 | Draft LS on work split between RAN1 and RAN2 for intra-UE prioritization and Multiplexing | Huawei, HiSilicon | imported from 3GU |
R2‑1910362 | Intra-UE prioritization/Multiplexing between L1/L2 Control and Data | Huawei, HiSilicon | imported from 3GU |
R2‑1910363 | Handling of de-prioritized MAC PDU due to intra-UE prioritization | Huawei, HiSilicon | imported from 3GU |
R2‑1910364 | Prioritization between overlapping Configured Grants | Huawei, HiSilicon | imported from 3GU |
R2‑1910365 | URLLC SR cancellation due to BSR transmission on eMBB PUSCH | Huawei, HiSilicon | imported from 3GU |
R2‑1910366 | Introduce Intra-UE prioritization and Multiplexing to MAC | Huawei, HiSilicon | imported from 3GU |
R2‑1910367 | Activation/deactivation of PDCP duplication of up to 4 legs | Huawei, HiSilicon | imported from 3GU |
R2‑1910368 | Draft CR for PDCP duplication to TS 38.321 | Huawei, HiSilicon | imported from 3GU |
R2‑1910369 | Draft CR for PDCP duplication to TS 38.323 | Huawei, HiSilicon | imported from 3GU |
R2‑1910370 | On necessity of per-packet selective duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1910371 | LCP restriction for duplication with up to 4 legs | Huawei, HiSilicon | imported from 3GU |
R2‑1910372 | BAP configuration | Samsung | imported from 3GU |
R2‑1910373 | Control signalling mapping in IAB network | Samsung | imported from 3GU |
R2‑1910374 | Discussion on local decision make for routing | Samsung | imported from 3GU |
R2‑1910375 | DL End-to-End flow control in IAB network | Samsung | imported from 3GU |
R2‑1910376 | Upstream BH link RLF notification | Samsung | imported from 3GU |
R2‑1910377 | Discussion on fallbackRAR in msg2 | Google Inc. | imported from 3GU |
R2‑1910378 | Further consideration of MsgB contents and procedure when CCCH SDU is included in MsgA | Intel Corporation | imported from 3GU |
R2‑1910379 | MsgB format design when CCCH message is included in MsgA | Intel Corporation | imported from 3GU |
R2‑1910380 | PC5 link identifier for unicast communication in NR V2X | Intel Corporation | imported from 3GU |
R2‑1910381 | PC5-RRC procedure details for NR V2X | Intel Corporation | imported from 3GU |
R2‑1910382 | Simultaneous operation of mode1 and mode2 in NR V2X | Intel Corporation | imported from 3GU |
R2‑1910383 | Control plane consideration for dual active protocol stack (DAPS) based LTE enhanced MBB HO | Intel Corporation, Qualcomm Inc, Charter Communications, Mediatek Inc | imported from 3GU |
R2‑1910384 | Non DC based solution for 0ms interruption time | Intel Corporation, Mediatek Inc, OPPO, Google Inc., vivo, ETRI, CATT, China Telecom, Xiaomi, Charter Communications, ASUSTeK, LG Electronics, NEC, Ericsson, Apple, ITRI | imported from 3GU |
R2‑1910385 | DL data forwarding in simultaneous connectivity handover | Intel Corporation | imported from 3GU |
R2‑1910386 | Report on [106#65][R16 NB-IoT/eMTC] CP MT-EDT | Intel Corporation | imported from 3GU |
R2‑1910387 | Introduction of Rel-16 eMTC enhancements | Intel Corporation | imported from 3GU |
R2‑1910388 | Consideration on DL positioning method in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910389 | Consideration on UL positioning method in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910390 | On-demand PRS transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910391 | Beam management for uplink positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1910392 | Beam management for downlink positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1910393 | Consideration on Multi-RTT positioning in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910394 | Signalling design for positioning system information | Huawei, HiSilicon | imported from 3GU |
R2‑1910395 | Discussion on DL-only UE-based positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1910396 | Consideration on scheduling enhancement for TSN Flow | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910397 | Consideration on CG confrimation MAC CE in case that mulitple configured grant for a given BWP | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910398 | Consideration on the multiplexing between BSR MAC CE and URLLC data | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910399 | Consideration on HARQ conflic between configured grant and Dynamic grant | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910400 | Consideration on Finer Granularity of Periodic of CG/SPS | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910401 | Consideration on Enhancement of TCI state for multiple-TRP transmission | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910402 | Consideration on intra-UE multiplexing inlcuding retransmission | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910403 | Consideration on the impact from introduction of WUS signal | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910404 | Consideration on Beam failure recovery for SCell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910405 | Discussion on on-demand SI requst and delivery in RRC_CONNECTED | Huawei, HiSilicon | imported from 3GU |
R2‑1910406 | Discussion on SI change in RRC_CONNECTED | Huawei, HiSilicon | imported from 3GU |
R2‑1910407 | TA update after PUR transmission via MAC CE | Sequans Communications | imported from 3GU |
R2‑1910408 | Apparent contradiction in Zone Configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910409 | Cross RAT Resource allocation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910410 | Diversity in RACH transmissions | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910411 | HARQ feedback impact on RAN2 | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910412 | PC5-S and Identification on PC5 RRC and RRC Procedures | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910413 | Support measurements on multiple SSBs for one cell | Huawei, HiSilicon | imported from 3GU |
R2‑1910414 | 38.331 CR on counter check procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1910415 | Clarification on ElementList without AddMod and Release structure | Huawei, HiSilicon | imported from 3GU |
R2‑1910416 | Clarification on definition of PUSCH-Less Scell | Huawei, HiSilicon | imported from 3GU |
R2‑1910417 | Corrections on MIB reception | Huawei, HiSilicon | imported from 3GU |
R2‑1910418 | Cat M1/M2 indication during RRC connection establishment | Ericsson | imported from 3GU |
R2‑1910419 | LS reply on LTE-M indication | Ericsson | imported from 3GU |
R2‑1910420 | Report on email discussion [106#64] on UP MT EDT | Ericsson | imported from 3GU |
R2‑1910421 | MT early data after preamble | Ericsson | imported from 3GU |
R2‑1910422 | MT early data in Msg4 | Ericsson | imported from 3GU |
R2‑1910423 | Handling UE context for Msg2-based MT UP-EDT | Ericsson | imported from 3GU |
R2‑1910424 | Draft reply LS to SA2 on MT-EDT | Ericsson | imported from 3GU |
R2‑1910425 | Draft reply LS to RAN3 on MT-EDT indication | Ericsson | imported from 3GU |
R2‑1910426 | Scheduling enhancements for LTE-MTC and NB-IoT | Ericsson | imported from 3GU |
R2‑1910427 | MPDCCH performance improvement for LTE-M | Ericsson | imported from 3GU |
R2‑1910428 | ETWS/CMAS in connected mode for non-BL UEs | Ericsson | imported from 3GU |
R2‑1910429 | Standalone deployment for LTE-M | Ericsson | imported from 3GU |
R2‑1910430 | Text Proposal for standalone deployment for LTE-M | Ericsson | imported from 3GU |
R2‑1910431 | UP solution for eMTC/NB-IoT connected to 5GC | Ericsson | imported from 3GU |
R2‑1910432 | Mobility based WUS grouping | Ericsson | imported from 3GU |
R2‑1910433 | UE_ID based WUS grouping | Ericsson | imported from 3GU |
R2‑1910434 | Service based WUS groups, common WUS and paging multiplexing | Ericsson | imported from 3GU |
R2‑1910435 | Report on email discussion [106#60] D-PUR TA validation criteria | Ericsson | imported from 3GU |
R2‑1910436 | General PUR Procedure | Ericsson | imported from 3GU |
R2‑1910437 | PUR periodicity and UE multiplexing | Ericsson | imported from 3GU |
R2‑1910438 | PUR with DCI scheduling | Ericsson | imported from 3GU |
R2‑1910439 | Support for flow based QoS and slicing for NB-IoT and eMTC connected to 5GC | Ericsson | imported from 3GU |
R2‑1910440 | Other open issues when connecting eMTC and NB-IoT to 5GC | Ericsson | imported from 3GU |
R2‑1910441 | SL and UL BWP Numerology Mismatch | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910442 | Subtopics to be addressed in Sim M1M2 | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910443 | Correction on non-critical extension for reportSFTD | Huawei, HiSilicon | imported from 3GU |
R2‑1910444 | Correction on non-critical extension for NRDC-Parameters | Huawei, HiSilicon | imported from 3GU |
R2‑1910445 | Report for [106#48][IAB] BAP Modeling (Intel) | Intel Corporation | imported from 3GU |
R2‑1910446 | IAB Routing - further detials | Intel Corporation | imported from 3GU |
R2‑1910447 | Multi-connectivity support in IAB | Intel Corporation | imported from 3GU |
R2‑1910448 | Further discussion on Backhaul RLF handling | Intel Corporation | imported from 3GU |
R2‑1910449 | Flow control in IAB | Intel Corporation | imported from 3GU |
R2‑1910450 | Lossless Delivery | Intel Corporation | imported from 3GU |
R2‑1910451 | Handling of fairness in IAB | Intel Corporation | imported from 3GU |
R2‑1910452 | Conditional Handover for Non-Terrestrial Networks | Intel Corporation | imported from 3GU |
R2‑1910453 | UE based PDCP duplication activation/deactivation | Intel Corporation | imported from 3GU |
R2‑1910454 | Intra UE prioritization of UL Data and Data | Intel Corporation | imported from 3GU |
R2‑1910455 | Discussion on the interpretation of NW assigned capability ID | Intel Corporation | imported from 3GU |
R2‑1910456 | RRC Signaling impact from RACS | Intel Corporation | imported from 3GU |
R2‑1910457 | Running CR for the introduction of NR positioning | Intel Corporation | imported from 3GU |
R2‑1910458 | Open items in RACS | Intel Corporation | imported from 3GU |
R2‑1910459 | Clarification on the Manufacturer based ID | Intel Corporation | imported from 3GU |
R2‑1910460 | Miscellaneous corrections | Intel Corporation | imported from 3GU |
R2‑1910461 | Capability of measurement gap patterns | Intel Corporation | imported from 3GU |
R2‑1910462 | LTE-M Identification in 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1910463 | [DRAFT] LS on LTE-M identification in 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1910464 | Support of ETWS/CMAS by non-BL UE operating in CE mode | Qualcomm Incorporated | imported from 3GU |
R2‑1910465 | Serviced based UE sub-grouping on wake-up signal channel | Qualcomm Incorporated | imported from 3GU |
R2‑1910466 | WUS grouping design overview and UE distribution | Qualcomm Incorporated | imported from 3GU |
R2‑1910467 | UAC information change indication in 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1910468 | Access stratum changes to support short eDRX for eMTC connected 5GC in RRC_INACTIVE state | Qualcomm Incorporated | imported from 3GU |
R2‑1910469 | Idle Mode cell reselection based on CN type supported | Qualcomm Incorporated | imported from 3GU |
R2‑1910470 | Access stratum enhancements to support 5GC QoS, Slicing features for both NB-IoT and eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1910471 | Access stratum changes to support Non-EDT control plane optimization for eMTC/NB-IoT connected to 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1910472 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1910473 | PDCP type to be used for NB-IoT and eMTC connected to 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1910474 | Security for inter-IAB node signalling | Ericsson | imported from 3GU |
R2‑1910475 | Draft LS to SA3 on inter-IAB node signalling security | Ericsson | imported from 3GU |
R2‑1910476 | CP Signalling via LTE for NSA IAB Deployments | Ericsson | imported from 3GU |
R2‑1910477 | Support for Multiple MTs in the same IAB node | Ericsson | imported from 3GU |
R2‑1910478 | Layer 2 Structure for IAB Nodes | Ericsson | imported from 3GU |
R2‑1910479 | Support for LTE Deployment at IAB Node Sites | Ericsson | imported from 3GU |
R2‑1910480 | Mapping of CP data over Backhaul links | Ericsson | imported from 3GU |
R2‑1910481 | On Bearer Mapping in Intermediate IAB Nodes | Ericsson | imported from 3GU |
R2‑1910482 | Next hop Identifier for Packet Forwarding in IAB Networks | Ericsson | imported from 3GU |
R2‑1910483 | Backhaul Adaptation Protocol (BAP) Header Content | Ericsson | imported from 3GU |
R2‑1910484 | Follow up on email discussion 106#48 - BAP entity modeling | Ericsson, Huawei, Samsung, ITRI, NEC, Sony, OMESH | imported from 3GU |
R2‑1910485 | IAB node Indication in RRC Setup Complete | Ericsson | imported from 3GU |
R2‑1910486 | Short Timestamps for User Plane Latency Control | Ericsson | imported from 3GU |
R2‑1910487 | Configured Scheduling in IAB Networks | Ericsson | imported from 3GU |
R2‑1910488 | SR Enhancement in IAB Network | Ericsson | imported from 3GU |
R2‑1910489 | Logical Channel Priority Extension | Ericsson | imported from 3GU |
R2‑1910490 | Recovery of data upon an RLF in IAB networks | Ericsson | imported from 3GU |
R2‑1910491 | LCID Extension | Ericsson | imported from 3GU |
R2‑1910492 | LCG Extension | Ericsson | imported from 3GU |
R2‑1910493 | RLC and PDCP SN length in IAB | Ericsson | imported from 3GU |
R2‑1910494 | Access identities and Access categories for IAB nodes | Ericsson | imported from 3GU |
R2‑1910495 | RRC Connection Re-establishment Cause Values for IAB Nodes | Ericsson | imported from 3GU |
R2‑1910496 | RRC Aspects of Backhaul RLC Channel Setup and Modification Procedure | Ericsson | imported from 3GU |
R2‑1910497 | Backhaul link RLF Notification Types to Downstream IAB Node(s) | Ericsson | imported from 3GU |
R2‑1910498 | Draft LS to SA2 on Remaining IAB Issues | Ericsson | imported from 3GU |
R2‑1910499 | Uplink Grant Skipping Behaviour of IAB Node | Ericsson | imported from 3GU |
R2‑1910500 | User Plane Aspects of Supporting NR-DC for IAB Nodes | Ericsson | imported from 3GU |
R2‑1910501 | Remaining Issues Related to Support for IAB Nodes in 5GC/EPC | Ericsson | imported from 3GU |
R2‑1910502 | Routing Aspects for Uplink Traffic in IAB Network | Ericsson | imported from 3GU |
R2‑1910503 | IAB DL Flow Control - General Principles | Ericsson | imported from 3GU |
R2‑1910504 | Signaling Aspects of BH Bearer and BAP Layer configuration | Ericsson | imported from 3GU |
R2‑1910505 | Functions in the Transmitting and Receiving BAP Entity | Ericsson | imported from 3GU |
R2‑1910506 | BSR and SR in IAB Networks | Ericsson | imported from 3GU |
R2‑1910507 | Allowing only IAB nodes in a standalone NR deployment | Ericsson | imported from 3GU |
R2‑1910508 | NTN Regulatory Aspects | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R2‑1910509 | Considerations on signaling flow of CHO | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1910510 | CR on signalling flow of CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910511 | Overview on spec impacts for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910512 | Discussion on bye message for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910513 | Dual L3 filters for Conditional handover | Huawei, HiSilicon | imported from 3GU |
R2‑1910514 | Discussion on legacy handover handling during CHO procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1910515 | Discussion on CHO preparation | Huawei, HiSilicon | imported from 3GU |
R2‑1910516 | Discussion on early data forwarding for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910517 | Discussion on UE behaviors upon re-establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1910518 | Discussion on bye message for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910519 | Discussion on combination of simultaneous connectivity and CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910520 | Discussion on Conditional SN Change in MR-DC scenario | Huawei, HiSilicon | imported from 3GU |
R2‑1910521 | Consideration on fast HO failure recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1910522 | Discussion on NR UDC configuration for split bearer | Huawei, HiSilicon | imported from 3GU |
R2‑1910523 | Discussion on integrity protection and ciphering for NR UDC | Huawei, HiSilicon | imported from 3GU |
R2‑1910524 | Draft Reply LS on physical layer data rate of RAN-assisted codec adaptation | Huawei | imported from 3GU |
R2‑1910525 | PDCCH Based Power Saving Signal/Channel | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910526 | Power consumption reduction in RRM measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910527 | UE assistance information for RRC connection management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910528 | On autonomous RRC state transitions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910529 | Transition out of RRC_CONNECTED | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910530 | UE power consumption reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910531 | On MIMO layer adaptation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910532 | On combined RRC procedures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910533 | Handling of integrity failure on split SRB | Nokia, Nokia shanghai Bell | imported from 3GU |
R2‑1910534 | Resource Pool Sharing between Mode 1 and Mode 2 UEs | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1910535 | Clarification on inter-node message | Google Inc. | imported from 3GU |
R2‑1910536 | Resource Allocation for Mode 2 NR V2X | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1910537 | Resource Allocation Procedures for NR V2X | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1910538 | Further consideration on UL low-latency scheduling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910539 | Correction to sTTI and sPT capability reporting | Google Inc. | imported from 3GU |
R2‑1910540 | RRM Measurements for Mobility in NR-U | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1910541 | Mobility for GEO NTN | Ericsson | imported from 3GU |
R2‑1910542 | Further detail on Earth fixed tracking area for LEO NTN | Ericsson | imported from 3GU |
R2‑1910543 | Cell selection and reselection for NTN GEO and LEO | Ericsson | imported from 3GU |
R2‑1910544 | Service continuity for transparent LEO | Ericsson | imported from 3GU |
R2‑1910545 | Time to trigger for CHO execution condition | Fraunhofer HHI | imported from 3GU |
R2‑1910546 | Correction to ROHC handling | Google Inc. | imported from 3GU |
R2‑1910547 | Cell selection for RLF recovery | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910548 | Correction to IMS capability | Google Inc. | imported from 3GU |
R2‑1910549 | Details on CHO execution in LTE | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910550 | Reconfiguration with sync | Google Inc. | imported from 3GU |
R2‑1910551 | Reply LS on RAN sharing and emergency services with Non-Public Networks | Huawei, HiSilicon | imported from 3GU |
R2‑1910552 | Discussion on RAN sharing and emergency services with NPN | Huawei, HiSilicon | imported from 3GU |
R2‑1910553 | Consideration on impact on system information | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1910554 | Support for SNPN and CAG cell reselection | Huawei, HiSilicon | imported from 3GU |
R2‑1910555 | LS to CTI on PLMN and cell selection for NPN | Huawei, HiSilicon | imported from 3GU |
R2‑1910556 | Access control for SNPN and CAG | Huawei, HiSilicon | imported from 3GU |
R2‑1910557 | Support inactive for SNPN and CAG | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1910558 | Discussion on RNA configuration for SNPN and CAG | Huawei, HiSilicon | imported from 3GU |
R2‑1910559 | Discussion on Proximity Indication of NPN | Huawei, HiSilicon | imported from 3GU |
R2‑1910560 | RRC processing delays for combined procedures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910561 | Conditional HO execution | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910562 | Discussion on Inter-RAT measurement for SRVCC from 5GS to UTRAN | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1910563 | Support the indirect Inter-RAT SRVCC handover procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1910564 | UE capability reporting for supporting SRVCC | Huawei, HiSilicon | imported from 3GU |
R2‑1910565 | Impact on 3G of 5G SRVCC | Huawei, HiSilicon | imported from 3GU |
R2‑1910566 | Draft 38.331 CR on 5G SRVCC | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1910567 | Draft LS on impact on UTRAN of 5G SRVCC | Huawei, HiSilicon | imported from 3GU |
R2‑1910568 | Draft 25.331 CR on 5G SRVCC | Huawei, HiSilicon | imported from 3GU |
R2‑1910569 | Clarification to initial AS security activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910570 | RACH-less handover for NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910571 | Inactive state in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910572 | Consideration on TA management mechanism in LEO NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910573 | Considerations on positioning method in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910574 | CP latency for NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910575 | Consideration on CHO in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910576 | Analysis on handover interruption time for NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910577 | Service continuity between Non-Terrestrial and Terrestrial Networks | Huawei, HiSilicon | imported from 3GU |
R2‑1910578 | Considerations on cell reselection in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1910579 | Correction to NR SCG failure reporting in EN-DC | Google Inc. | imported from 3GU |
R2‑1910580 | Considerations on data forwarding aspect. | Huawei, HiSilicon | imported from 3GU |
R2‑1910581 | Considerations on detaching aspect | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1910582 | Further consideration on reply LSs from RAN1 and RAN4 | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1910583 | Preamble gap design for one uplink path | Huawei, HiSilicon | imported from 3GU |
R2‑1910584 | single uplink feedback for dual downlink data transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910585 | DRAFT LS on data forwarding procedure of non-split bearer solution | Huawei, HiSilicon | imported from 3GU |
R2‑1910586 | Draft CR for 36.323 on supporting non-split bearer solution | Huawei, HiSilicon | imported from 3GU |
R2‑1910587 | Considerations on UL data handling in receiver side | Huawei, HiSilicon | imported from 3GU |
R2‑1910588 | Considerations on 0ms interruption handover for single TRX UE | Huawei, HiSilicon | imported from 3GU |
R2‑1910589 | Considerations on RLM for DAPS | Huawei, HiSilicon | imported from 3GU |
R2‑1910590 | Considerations on UE capability coordination | Huawei, HiSilicon | imported from 3GU |
R2‑1910591 | Considerations on PDCP aspects of DAPS | Huawei, HiSilicon | imported from 3GU |
R2‑1910592 | Discussion on UDC handling in eMBB | Huawei, HiSilicon | imported from 3GU |
R2‑1910593 | Failure handling with CHO configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910594 | Problems of ROHC handling in eMBB HO | Huawei, HiSilicon | imported from 3GU |
R2‑1910595 | Discussion on eMBB HO without packet duplication or simultaneous UL PUSCH transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910596 | Handover schemes comparison under DC Scenarios | Huawei, HiSilicon | imported from 3GU |
R2‑1910597 | Summary of the major differences of DC HO vs MBB HO | Huawei, HiSilicon | imported from 3GU |
R2‑1910598 | Handover based on DC for 0ms interruption | Huawei, HiSilicon | imported from 3GU |
R2‑1910599 | Procedure analysis of DC-based handover | Huawei, HiSilicon | imported from 3GU |
R2‑1910600 | Security key change without L2 reset | Huawei, HiSilicon | imported from 3GU |
R2‑1910601 | DC based solution for intra-frequency mobility in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910602 | Mobility enhancements under CU-DU architecture | Huawei, HiSilicon | imported from 3GU |
R2‑1910603 | Discussion on TDM Pattern for intra-frequency Handover | Huawei, HiSilicon | imported from 3GU |
R2‑1910604 | Discussion on BWP indication for intra-frequency Handover | Huawei, HiSilicon | imported from 3GU |
R2‑1910605 | Further consideration on reply LSs from RAN1 and RAN4 | Huawei, HiSilicon | imported from 3GU |
R2‑1910606 | Considerations on 0ms interruption handover for single TRX UE | Huawei, HiSilicon | imported from 3GU |
R2‑1910607 | Discussion on RACH-less solution | Huawei, HiSilicon | imported from 3GU |
R2‑1910608 | Discussion on position based solution for RACH-less handover | Huawei, HiSilicon | imported from 3GU |
R2‑1910609 | Discussion on combination of simultaneous connectivity and CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1910610 | Mobility state related information inheritance after inter-RAT cell reselection | Huawei, HiSilicon | imported from 3GU |
R2‑1910611 | Mobility state related information inheritance after inter-RAT cell reselection | Huawei, HiSilicon | imported from 3GU |
R2‑1910612 | Discussion on UE actions upon going to RRC_IDLE | Huawei, HiSilicon | imported from 3GU |
R2‑1910613 | Correction on UE actions upon going to RRC_IDLE | Huawei, HiSilicon | imported from 3GU |
R2‑1910614 | Clarification on the configuration of securityConfig in RadioBearerConfig | Huawei, HiSilicon | imported from 3GU |
R2‑1910615 | Details on failure handling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1910616 | Increasing Tx opportunities for Msg1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910617 | Contention resolution based on LBT outcome of Msg3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910618 | RA-RNTI design with extended response window | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910619 | Contention resolution for CONNECTED mode UE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910620 | Design of MsgB MAC PDU format | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910621 | RNTI design for MsgB reception | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910622 | Beam failure recovery for SCell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910623 | Draft Reply LS on MAC CE design for SCell BFR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910624 | Correction on beamFailureRecoveryConfig | Huawei, HiSilicon | imported from 3GU |
R2‑1910625 | Correction on acquisition of MIB and SIB1 for re-establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1910626 | Correction on band selection in SIB1 | Huawei, HiSilicon | imported from 3GU |
R2‑1910627 | Correction on acquisition of cell selection parameters in SIB2 and SIB4 | Huawei, HiSilicon | imported from 3GU |
R2‑1910628 | Correction on frequency hopping offset for inter-slot hopping | Huawei, HiSilicon | imported from 3GU |
R2‑1910629 | Remaining issues on rateMatchPattern | Huawei, HiSilicon | imported from 3GU |
R2‑1910630 | MAC CE format to indicate up to 2 TCI state per indication | OPPO | imported from 3GU |
R2‑1910631 | Running CR to 37.340 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910632 | Running CR to 36.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910633 | Running CR to 38.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910634 | Definition of V2X Sidelink Communication for LTE Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910635 | Layer-1 and Layer 2 Identifiers for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910636 | Proposed LS on Layer-1 and Layer 2 Identifiers for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910637 | Establishment of SLRBs for TX UE in RRC_CONNECTED | LG Electronics Inc. | imported from 3GU |
R2‑1910638 | Priority handling for transmission of a PC5-RRC message | LG Electronics Inc. | imported from 3GU |
R2‑1910639 | Unicast-assisted groupcast transmissions | LG Electronics Inc. | imported from 3GU |
R2‑1910640 | Protocol Stack and AS Delivery of PC5-S Signaling | LG Electronics Inc. | imported from 3GU |
R2‑1910641 | Proposed LS on PC5-S Signaling for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1910642 | SDAP entity for each destination | LG Electronics Inc. | imported from 3GU |
R2‑1910643 | SLRB reconfiguration in state transition | LG Electronics Inc. | imported from 3GU |
R2‑1910644 | MAC CE format to indicate up to two TCI states | OPPO | imported from 3GU |
R2‑1910645 | Correction on PRACH re-transmission for SRS carrier switching | Huawei, HiSilicon | imported from 3GU |
R2‑1910646 | Correction on contention resolution with CCCH SDU in msg3 | Huawei, HiSilicon | imported from 3GU |
R2‑1910647 | Correction on the common time alignment timer | Huawei, HiSilicon | imported from 3GU |
R2‑1910648 | Use case and Signaling for RSS | Ericsson | imported from 3GU |
R2‑1910649 | NRS Signalling Configuration | Ericsson | imported from 3GU |
R2‑1910650 | On Demand Delivery of Positioning Assistance Data | Ericsson | imported from 3GU |
R2‑1910651 | Discussion on posSI Scheduling | Ericsson | imported from 3GU |
R2‑1910652 | Configuring and Signalling for Uplink Positioning Methods in FR2 | Ericsson | imported from 3GU |
R2‑1910653 | Authorization for UE Based Positioning Methods | Ericsson | imported from 3GU |
R2‑1910654 | [DRAFT] LS on DL-only UE-based positioning | Ericsson [To be RAN2] | imported from 3GU |
R2‑1910655 | Specify UDC Header is part of Data Field | Ericsson | imported from 3GU |
R2‑1910656 | Quality Report for NB-IoT | Ericsson | imported from 3GU |
R2‑1910657 | Distinguishing Location Source when sensor method is used | Ericsson, Sony | imported from 3GU |
R2‑1910658 | NR uplink positioning | Ericsson | imported from 3GU |
R2‑1910659 | UE Based Positioning Method | Ericsson | imported from 3GU |
R2‑1910660 | Beam Selection for PRS Transmission in FR2 | Ericsson | imported from 3GU |
R2‑1910661 | New SIB for hosting posSI Scheduling Information | Ericsson | imported from 3GU |
R2‑1910662 | Idle mode positioning solutions | Ericsson | imported from 3GU |
R2‑1910663 | PRS in shared NR-LTE spectrum | Ericsson | imported from 3GU |
R2‑1910664 | View on Multi-Cell RTT | Ericsson | imported from 3GU |
R2‑1910665 | Draft CR for A new SIB to host posSIB scheduling information | Ericsson | imported from 3GU |
R2‑1910666 | Correction to EUTRA SCG failure reporting in NE-DC | Google Inc. | imported from 3GU |
R2‑1910667 | Uplink BH RLC Channel Mapping in IAB Nodes | Ericsson | imported from 3GU |
R2‑1910668 | Discussion on the MsgA resource selection | Huawei, HiSilicon | imported from 3GU |
R2‑1910669 | Discussion on fallbackRAR | Huawei, HiSilicon | imported from 3GU |
R2‑1910670 | Discussion on the MSGA resource configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910671 | Discussion on content for successRAR | Huawei, HiSilicon | imported from 3GU |
R2‑1910672 | Discussion MAC PDU format for msgB | Huawei, HiSilicon | imported from 3GU |
R2‑1910673 | Introduction of multiple SMTCs per frequency carrier in idle mode | Orange, AT&T, Vodafone | imported from 3GU |
R2‑1910674 | Multiple SMTCs per frequency carrier in idle mode | Orange, Telecom Italia S.p.A., Vodafone, AT&T | imported from 3GU |
R2‑1910675 | Discussion on HARQ for MsgA | Huawei, HiSilicon | imported from 3GU |
R2‑1910676 | Discussion on power control for MsgA | Huawei, HiSilicon | imported from 3GU |
R2‑1910677 | Backoff for two-step random access | Huawei, HiSilicon | imported from 3GU |
R2‑1910678 | Discussion on the timers for 2-step RACH | Huawei, HiSilicon | imported from 3GU |
R2‑1910679 | Differentiation for two-step random access | Huawei, HiSilicon | imported from 3GU |
R2‑1910680 | Discussion on HARQ for msgB | Huawei, HiSilicon | imported from 3GU |
R2‑1910681 | Measurement gap and 2-step RACH | Huawei, HiSilicon | imported from 3GU |
R2‑1910682 | 2-step RACH and preamble transmission counters | Huawei, HiSilicon | imported from 3GU |
R2‑1910683 | Discussion on supported scenarios for fallbacks in two-step RACH | Huawei, HiSilicon | imported from 3GU |
R2‑1910684 | Conditional Handover without explict trigger condition | vivo | imported from 3GU |
R2‑1910685 | Public safety usage scenario for NTN | FirstNet, AT&T, Thales | imported from 3GU |
R2‑1910686 | Non-anchor carrier measurements for RRM | Qualcomm Incorporated | imported from 3GU |
R2‑1910687 | 5G Indicator and Unsupported Frequency Band | VODAFONE, BT | imported from 3GU |
R2‑1910688 | Consistent LBT failure detection and recovery | Google Inc. | imported from 3GU |
R2‑1910689 | CAPC for configured grants in NR-U | Google Inc. | imported from 3GU |
R2‑1910690 | Enhanced inter-system mobility in RRC_INACTIVE in spotty NR coverage | Ericsson | imported from 3GU |
R2‑1910691 | Enhancements for Conditional Handover in FR2 | Apple Inc. | imported from 3GU |
R2‑1910692 | Report of Email Discussion [106#72] [NR/NTN] TP on NTN-TN Service continuity | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910693 | UE positioning requirements in NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910694 | Pre-trigger based mobility for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910695 | Considerations on the use of satellite Id in NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910696 | Discussion on TA management for NTN LEO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910697 | Consideration on NR SS-SINR capability in LTE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910698 | Discussion on feeder link switch for regenerative & transparent NTN LEO scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910699 | Introduction of Rel-16 eMTC enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑1910700 | Analysis of Rel-14 and Rel-16 capabilities for high-speed trains | Ericsson | imported from 3GU |
R2‑1910701 | Introduction of further enhanced performance requirements for high-speed trains | Ericsson | imported from 3GU |
R2‑1910702 | Introduction of further enhanced performance requirements for high-speed trains | Ericsson | imported from 3GU |
R2‑1910703 | Further consideration on DL aspects of D-PUR in IDLE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910704 | Miscellaneous non-controversial corrections Set III | Ericsson | imported from 3GU |
R2‑1910705 | UE Capabilities covering across all serving cells | Ericsson, Qualcomm Incorporated | imported from 3GU |
R2‑1910706 | Channel Bandwidth validation upon SIB1 acquisition | Ericsson, ZTE Corporation | imported from 3GU |
R2‑1910707 | Clarification on carrierFreqDL | Ericsson | imported from 3GU |
R2‑1910708 | AS-ConfigNR at handover with (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1910709 | On RRM policies for slicing and network sharing in split deployment scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910710 | [Draft] Reply LS on radio resource management policy | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910711 | Required changes to TS37.320 on NR MDT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910712 | Running CR to Introduce NR MDT for RAN Data Collection and Utilization | Nokia, Nokia Shanghai Bell (Rapporteur) | imported from 3GU |
R2‑1910713 | Logged MDT for RRC_INACTIVE state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910714 | Accurate UE-RAN delay measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910715 | [Draft] LS on UE RAN end-to-end delay measurement per bearer per UE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910716 | Beam measurements linked to successful and failed handovers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910717 | RACHreport contents and retrieval for different RACH Triggers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910718 | RACH report contents for Normal Uplink (NUL) and Supplementary Uplink (SUL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910719 | Interference spot detection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910720 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910721 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910722 | Unclarities in physical layer configuration for PUSCH enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910723 | [Draft] LS on unclarities in physical layer configuration for PUSCH enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910724 | L4S support in 5G | Ericsson | imported from 3GU |
R2‑1910725 | Filtering for UE manufacturer-specific UE capability ID | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910726 | On the association of assigned Capability ID to the reported UE capability | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910727 | Processing time for UE capability in case of RRC segmentation | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910728 | Filtering for PLMN specific UE capability ID | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910729 | Draft LS on the filter associated with PLMN assigned UE Capability IDs | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910730 | On the combined support of UE capability ID and RRC segmentation | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910731 | UE Capability ID transfer for handover | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910732 | Storage and transfer of UE manufacturer based capability ID in the network side | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910733 | On the security of UE Capability ID and UECapabilityInformation | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910734 | Draft LS on the security of UE Capability ID | Huawei Technologies Co. Ltd. | imported from 3GU |
R2‑1910735 | Report for email discussion [106#56][IIOT] SR vs PUSCH prioritization (QC) | Qualcomm Incorporated | imported from 3GU |
R2‑1910736 | Intra-UE prioritization framework and RAN1 impacts | Qualcomm Incorporated | imported from 3GU |
R2‑1910737 | Default DRB handling | ZTE Corporation, Ericsson | imported from 3GU |
R2‑1910738 | Discussion on the DL UL handling for Non-DC based solutions | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910739 | Discussion on the PDCP aspects for Non-DC based solutions | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910740 | Discussion on the need of RACH-less HO in NR | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910741 | Further issues for CHO execution | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910742 | Further issues for CHO configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910743 | Discussion on the fast RLF recovery with the applying of CHO and DC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910744 | Discussion on applying CHO based SCG mobility | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910745 | Remaining Issues on Early Measurements | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910746 | On Validity Area | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910747 | On Inter-RAT Operation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910748 | On Directly Configuring SCell as Activated | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910749 | On CSI Reporting during SCell Activation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910750 | Further Consideration on Fast SCell Activation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910751 | On MCG and SCG Configuration with Resume Procedure | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910752 | Draft 38.331 CR - MR-DC Configuration with Resume | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910753 | Draft 36.331 CR - MR-DC configuration with resume | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910754 | signalling overhead reduction for cell configuration and BWP configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910755 | Further issues for MCG fast recovery via SCG | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910756 | PCell failure recovery via SCell(s) | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910757 | Discussion on the DL UL handling for RUDI | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910758 | Discussion on the PDCP aspects for RUDI | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910759 | Discussion on the capability coordination | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910760 | Further issues for CHO execution | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910761 | Further issues for CHO configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1910762 | PDCP Duplication Enhancements for URLLC traffic | Qualcomm Incorporated | imported from 3GU |
R2‑1910763 | More granularity for PDCP discardTimer | QUALCOMM Europe Inc. - Italy | imported from 3GU |
R2‑1910764 | Principles for Ethernet Header Compression | Qualcomm Incorporated | imported from 3GU |
R2‑1910765 | Reference timing delivery determination | Qualcomm Incorporated | imported from 3GU |
R2‑1910766 | Discussion of SA2 LS on RAN sharing and Emergency services with Non-Public Networks | Qualcomm Incorporated | imported from 3GU |
R2‑1910767 | Supporting SNPNs, CAGs and RAN sharing | Qualcomm Incorporated | imported from 3GU |
R2‑1910768 | Extending LCID value space in MAC subheader | Qualcomm Incorporated | imported from 3GU |
R2‑1910769 | Bearer re-mapping at intermediate IAB nodes | AT&T | imported from 3GU |
R2‑1910770 | Specification of BAP modeling | AT&T | imported from 3GU |
R2‑1910771 | Remaining details of BAP layer routing | AT&T | imported from 3GU |
R2‑1910772 | Radio-aware scheduling for IAB | AT&T | imported from 3GU |
R2‑1910773 | Delivery of control plane signaling to IAB nodes via LTE MeNB in NSA deployment | AT&T, KDDI, Verizon, KT | imported from 3GU |
R2‑1910774 | Control of pre-emptive SR/BSR functionality for low-latency scheduling | AT&T | imported from 3GU |
R2‑1910775 | Measurement quantities for sensor data collection | AT&T | imported from 3GU |
R2‑1910776 | Coexistence Between Configured and Dynamically Scheduled UL Grants | Ericsson | imported from 3GU |
R2‑1910777 | Further discussions on channel access priority | Ericsson | imported from 3GU |
R2‑1910778 | DRX enhancement for NR-U | Ericsson | imported from 3GU |
R2‑1910779 | Handling uplink LBT failures | Ericsson | imported from 3GU |
R2‑1910780 | On Autonomous UL Transmissions for NR-U | Ericsson | imported from 3GU |
R2‑1910781 | Scheduling request for NR-U | Ericsson | imported from 3GU |
R2‑1910782 | Discussions on RACH enhancements for NR-U | Ericsson | imported from 3GU |
R2‑1910783 | RAN2 impact of supporting wideband operation | Ericsson | imported from 3GU |
R2‑1910784 | Contention Resolution for NR-U | Ericsson | imported from 3GU |
R2‑1910785 | Signaling options of LBT category for Msg3 | Ericsson | imported from 3GU |
R2‑1910786 | Two step Random Access for NR-U | Ericsson | imported from 3GU |
R2‑1910787 | Draft LS to RAN1 on signalling options of LBT category for Msg3 | Ericsson | imported from 3GU |
R2‑1910788 | Draft NR-U running MAC CR | Ericsson, Qualcomm Incoporated | imported from 3GU |
R2‑1910789 | Configuration and de-configuration of AUL | Ericsson | imported from 3GU |
R2‑1910790 | Controlling AUL retransmissions with configured grants | Ericsson | imported from 3GU |
R2‑1910791 | Draft Channel Access Priority Class configuration for logical channels | Ericsson | imported from 3GU |
R2‑1910792 | Improved transmission mechanism for PUCCH-UCI | Ericsson | imported from 3GU |
R2‑1910793 | Draft CR 38300 Overall description of UL LBT failure handling | Ericsson | imported from 3GU |
R2‑1910794 | Discussions on transmission opportunities for Msg3 in NR-U | Ericsson | imported from 3GU |
R2‑1910795 | Draft CR Support HARQ feedback transmission on PUSCH without UL-SCH TB | Ericsson | imported from 3GU |
R2‑1910796 | New RAR formats for NR-U | Ericsson | imported from 3GU |
R2‑1910797 | The discussions on RRC signaling details in NR-Uu controlling LTE sidelink | ITRI | imported from 3GU |
R2‑1910798 | Discussion on information to be sent NW/UE for L2/3 QoS support | ITRI | imported from 3GU |
R2‑1910799 | upperLayerIndication and 5G icon | SPRINT Corporation | imported from 3GU |
R2‑1910800 | On UE-based Positioning in NR | ITRI | imported from 3GU |
R2‑1910801 | Further details on HARQ for NTN | Ericsson | imported from 3GU |
R2‑1910802 | On RLC impacts for NTN | Ericsson | imported from 3GU |
R2‑1910803 | On 2-step random access for NTN | Ericsson | imported from 3GU |
R2‑1910804 | Configured scheduling for NTN | Ericsson | imported from 3GU |
R2‑1910805 | On PDCP interruptions during handover for NTN | Ericsson | imported from 3GU |
R2‑1910806 | Access restrictions (barring) in IAB | SHARP Corporation | imported from 3GU |
R2‑1910807 | Security Configuration for Conditional Handover | SHARP Corporation | imported from 3GU |
R2‑1910808 | [DRAFT] LS on AS key derivation for conditional handover | SHARP Corporation | imported from 3GU |
R2‑1910809 | PDCP format in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1910810 | Security Configuration for Conditional Handover | SHARP Corporation | imported from 3GU |
R2‑1910811 | [DRAFT] LS on AS key derivation for conditional handover | SHARP Corporation | imported from 3GU |
R2‑1910812 | Paging for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1910813 | Discussion on multiplexing of data | Huawei, HiSilicon | imported from 3GU |
R2‑1910814 | Discussion on cell barring for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1910815 | Discussion on remaining issues of TSC assistance information | Huawei, HiSilicon | imported from 3GU |
R2‑1910816 | Reference time delivery based on UE request | Huawei, HiSilicon | imported from 3GU |
R2‑1910817 | Uncertainty parameter in reference time information | Huawei, HiSilicon | imported from 3GU |
R2‑1910818 | Solutions to mitigate the periodicity misalignment between TSC traffic and CG/SPS | Huawei, HiSilicon | imported from 3GU |
R2‑1910819 | Number of SPS/CG configurations for a serving cell | Huawei, HiSilicon | imported from 3GU |
R2‑1910820 | Discussion on supporting integer multiple of one slot for Configured Grant and SPS | Huawei, HiSilicon | imported from 3GU |
R2‑1910821 | Discussion on configuration method for SPS/CG | Huawei, HiSilicon | imported from 3GU |
R2‑1910822 | Determination of HARQ process ID for a CG/SPS occasion | Huawei, HiSilicon | imported from 3GU |
R2‑1910823 | Discussion on Configured Grant Confirmation MAC CE | Huawei, HiSilicon | imported from 3GU |
R2‑1910824 | Handling of URLLC data in UL during measurement gaps | Huawei, HiSilicon | imported from 3GU |
R2‑1910825 | Layer 2 parameters enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1910826 | Revisit of Uplink MDBV enforcement to support IIOT | Huawei, HiSilicon | imported from 3GU |
R2‑1910827 | LCP restriction enhancements for TSC traffic | Huawei, HiSilicon | imported from 3GU |
R2‑1910828 | Discussion on EHC header format | Huawei, HiSilicon | imported from 3GU |
R2‑1910829 | Discussion on context establishment for Ethernet header compression | Huawei, HiSilicon | imported from 3GU |
R2‑1910830 | Discussion on padding removal and IP compression for Ethernet header compression | Huawei, HiSilicon | imported from 3GU |
R2‑1910831 | PC5-RRC and PC5-S interactions and their security in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1910832 | Triggering condition for A1-A6 events in NR | Ericsson | imported from 3GU |
R2‑1910833 | CR to 38.331 on Triggering condition for A1-A6 events in NR | Ericsson | imported from 3GU |
R2‑1910834 | CR to 38.306 on Triggering condition for A1-A6 events in NR | Ericsson | imported from 3GU |
R2‑1910835 | M1 measurement configuration options for immediate MDT in NR | Ericsson | imported from 3GU |
R2‑1910836 | Draft LS on new features of M1 measurement configuration for immediate MDT | Ericsson | imported from 3GU |
R2‑1910837 | UE accessibility measurement enhancement in LTE and NR | Ericsson | imported from 3GU |
R2‑1910838 | Draft LS on Enhancement for Accessibility Measurement | Ericsson | imported from 3GU |
R2‑1910839 | Details of Connection Establishment Failure (CEF) Report in NR | Ericsson | imported from 3GU |
R2‑1910840 | RRC Connection Reestablishment failure Report | Ericsson | imported from 3GU |
R2‑1910841 | Successful handover report concernig RLM issues | Ericsson | imported from 3GU |
R2‑1910842 | Details of RACH Report Content in NR | Ericsson | imported from 3GU |
R2‑1910843 | CR38331 on RACH report contents in NR - Option-1 | Ericsson | imported from 3GU |
R2‑1910844 | CR38331 on RACH report contents in NR - Option-2 | Ericsson | imported from 3GU |
R2‑1910845 | TP to Stage-2 on RACH Optimization for TS 38.300 | Ericsson | imported from 3GU |
R2‑1910846 | Differentiation of DL and UL causes at RLF occurrence | Ericsson | imported from 3GU |
R2‑1910847 | Overview of Mobility Failure Cases and Potential Issues | Ericsson | imported from 3GU |
R2‑1910848 | CR to 38.331 on RLF report contents in NR | Ericsson | imported from 3GU |
R2‑1910849 | CR to 36.331 on RLF report contents in NR | Ericsson | imported from 3GU |
R2‑1910850 | TP to 36.300 on Inter-RAT failures related to EUTRAN-NR handovers | Ericsson | imported from 3GU |
R2‑1910851 | Usage of RLM related measurement in RLF report | Ericsson | imported from 3GU |
R2‑1910852 | Post RLF measurements | Ericsson | imported from 3GU |
R2‑1910853 | TP to 38.300 on Mobility Failure Cases | Ericsson | imported from 3GU |
R2‑1910854 | On the Usage of RRM measurement for CQD parameters | Ericsson | imported from 3GU |
R2‑1910855 | Inactive UE context count in NR as PM measurement | Ericsson | imported from 3GU |
R2‑1910856 | Draft LS on Inactive UE count in NR as PM measurement | Ericsson | imported from 3GU |
R2‑1910857 | RRC_CONNECTED UE count in NR as PM measurement | Ericsson | imported from 3GU |
R2‑1910858 | TP to 38.314 on RRC_CONNECTED UE count in NR as PM measurement | Ericsson | imported from 3GU |
R2‑1910859 | Text proposal to 38.314 on number of stored Inactive UE context count in NR | Ericsson | imported from 3GU |
R2‑1910860 | On random access preamble inclusion as L2 measurement | Ericsson | imported from 3GU |
R2‑1910861 | TP to 38.314 On random access preamble inclusion as L2 measurement | Ericsson | imported from 3GU |
R2‑1910862 | LS to SA5 on alignment between SA5 and RAN2 on L2 measurements | Ericsson | imported from 3GU |
R2‑1910863 | Discussion on alignment between SA5 and RAN2 on L2 measurements | Ericsson | imported from 3GU |
R2‑1910864 | Feasibility check on more L2 measurements due to SA5 progress | Ericsson | imported from 3GU |
R2‑1910865 | LS to SA5 on further feasibiltiy check for more L2 measurements | Ericsson | imported from 3GU |
R2‑1910866 | Draft LS to SA2 on URLLC related delay measurements | Ericsson | imported from 3GU |
R2‑1910867 | TP to 38.314 on UL air interface delay measurement | Ericsson | imported from 3GU |
R2‑1910868 | On UL air interface delay measurement and overall UL delay measurement | Ericsson | imported from 3GU |
R2‑1910869 | ANR leftovers from release 15 | Ericsson | imported from 3GU |
R2‑1910870 | Discussion on remaining issues on logical channel prioritization in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1910871 | PRACH Prioritization for MPS and MCS | Perspecta Labs, ECD, FirstNet, AT&T, Sprint, T-Mobile | imported from 3GU |
R2‑1910872 | Uplink and Sidelink Prioritization in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1910873 | Clarification on the need code of freqPriorityListEUTRA and freqPriorityListNR | Huawei, HiSilicon | imported from 3GU |
R2‑1910874 | Correction to the cell measurement quallity derivation in multi-beam operations for inter-RAT reselection from LTE to NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910875 | Correction to the cell measurement quallity derivation in multi-beam operations for inter-RAT reselection from LTE to NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910876 | On RRM relaxation with longer intervals | Huawei, HiSilicon | imported from 3GU |
R2‑1910877 | Triggering criteria for measurements with longer intervals | Huawei, HiSilicon | imported from 3GU |
R2‑1910878 | Detection of low mobility for RRM measurement relaxation | Huawei, HiSilicon | imported from 3GU |
R2‑1910879 | Text Proposal for 38.304 time domain RRM Relaxation | Huawei, HiSilicon | imported from 3GU |
R2‑1910880 | Text Proposal for 38.331 time domain RRM Relaxation | Huawei, HiSilicon | imported from 3GU |
R2‑1910881 | On RRM optimization by reducing the number of cell/frequency to be measured | Huawei, HiSilicon | imported from 3GU |
R2‑1910882 | Text Proposal for 38.304 frequency domain RRM Relaxation | Huawei, HiSilicon | imported from 3GU |
R2‑1910883 | Text Proposal for 38.331 frequency domain RRM Relaxation | Huawei, HiSilicon | imported from 3GU |
R2‑1910884 | Discussion on reducing neighbour cell measurements for Idle/Inactive UE | Huawei, HiSilicon | imported from 3GU |
R2‑1910885 | TP to 38.304 on reducing neighbour cell measurements for Idle/Inactive UE | Huawei, HiSilicon | imported from 3GU |
R2‑1910886 | TP to 38.331 on reducing neighbour cell measurements for Idle/Inactive UE | Huawei, HiSilicon | imported from 3GU |
R2‑1910887 | Discussion on SLRB configuration for UEs in IDLE/INACTIVE state | Qualcomm Incorporated | imported from 3GU |
R2‑1910888 | Inter-RAT resource allocation in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1910889 | Report of Email Discussion [106#49][NR-U] Consistent LBT Failures | Qualcomm Incorporated | imported from 3GU |
R2‑1910890 | Discussion on mode 1 resource allocation | Qualcomm Incorporated | imported from 3GU |
R2‑1910891 | Paging monitoring in NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1910892 | Remaining issues on cell reselection for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1910893 | Broadcasting of System Information in NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1910894 | RLC packet format in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1910895 | UE Capability for enhanced NR mobility | Qualcomm Incorporated | imported from 3GU |
R2‑1910896 | Pre-configured UL Resources Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R2‑1910897 | RRC release after EDT for User Plane CIoT EPS optimization | Ericsson | imported from 3GU |
R2‑1910898 | Draft LS on Filtering & PLMN Assigned ID | Ericsson LM | imported from 3GU |
R2‑1910899 | Introduction of RRC segmentation in LTE - Uplink | Ericsson LM | imported from 3GU |
R2‑1910900 | Draft CR for CLI reportConfig | Ericsson | imported from 3GU |
R2‑1910901 | Draft CR for CLI measObject | Ericsson | imported from 3GU |
R2‑1910902 | Discussion on CLI reporting method and criterion | Ericsson | imported from 3GU |
R2‑1910903 | CR 38.300 CLI | Ericsson | imported from 3GU |
R2‑1910904 | Open Issues for IAB Routing | Futurewei Technologies | imported from 3GU |
R2‑1910905 | Scheduling enhancements for TSN traffic | Intel Corporation | imported from 3GU |
R2‑1910906 | IMU sensor based reporting in the MDT logging | Nanjing Ericsson Panda Com Ltd | imported from 3GU |
R2‑1910907 | Feedback for Ethernet Header Compression | Sharp | imported from 3GU |
R2‑1910908 | Configuration of PDCP duplication with up to 4 RLC entities | Sharp | imported from 3GU |
R2‑1910909 | MCG RLF reporting via SCell | Samsung Research America | imported from 3GU |
R2‑1910910 | PDCP security issue | Samsung Research America | imported from 3GU |
R2‑1910911 | Correction of presence conditions for common PSCell parameters | Huawei, HiSilicon | imported from 3GU |
R2‑1910912 | Handling of SN terminated bearers at SN initiated SN release (resulting in SN release or change) | Huawei, HiSilicon | imported from 3GU |
R2‑1910913 | Draft LS on handling SN-initiated SN release | Huawei, HiSilicon | imported from 3GU |
R2‑1910914 | Avoiding release and add for SN terminated bearers at SN release | Huawei, HiSilicon | imported from 3GU |
R2‑1910915 | Avoiding release and add for SN terminated bearers at SN release | Huawei, HiSilicon | imported from 3GU |
R2‑1910916 | DRX configuration coordination in (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910917 | DRX Configuration Coordination in (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910918 | Release of unnecessary power restrictions upon RRC connection re-establishment in NE-DC and NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910919 | Support of E-UTRA SCG maximum power configuration in NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910920 | Miscellaneous Corrections on 38.331 for MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910921 | Miscellaneous Corrections on 36.331 for MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910922 | Correction on 36.331 for reconfiguration of SCG part of DRBs in NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910923 | Clarifications on control plane and bearer type selection for SN terminated bearers | Huawei, HiSilicon | imported from 3GU |
R2‑1910924 | Clarification on the late drop architecture | Huawei, HiSilicon | imported from 3GU |
R2‑1910925 | Support of LCID change for NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910926 | Clarfication on split SRB | Huawei, HiSilicon | imported from 3GU |
R2‑1910927 | Clarfication on split SRB | Huawei, HiSilicon | imported from 3GU |
R2‑1910928 | Capability report and coordination in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910929 | Clarification on ul-DCCH-MessageEUTRA message in NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910930 | UE capability coordination result exchange during handover for NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910931 | Correction of field inclusion for inter-node message | Huawei, HiSilicon | imported from 3GU |
R2‑1910932 | RRCReconfigurationComplete for SCG in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910933 | SFTD measurement information in CG-ConfigInfo | Huawei, HiSilicon | imported from 3GU |
R2‑1910934 | Reply LS on CSI-RS Transfer | Huawei, HiSilicon | imported from 3GU |
R2‑1910935 | Discussion on autonomous gaps | Huawei, HiSilicon | imported from 3GU |
R2‑1910936 | LS to RAN4 on autonomous gap | Huawei, HiSilicon | imported from 3GU |
R2‑1910937 | Correction for UE context retrieval | Huawei, HiSilicon | imported from 3GU |
R2‑1910938 | Correction on CGI measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1910939 | RAN2 specification impacts of multi-TRP transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910940 | MAC CE signalling enhancement for TCI indication of single-PDCCH based multi-TRP transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1910941 | MAC CE format design for SCell BFRQ | Huawei, HiSilicon | imported from 3GU |
R2‑1910942 | SMTC configuration for early measurement | Huawei, HiSilicon | imported from 3GU |
R2‑1910943 | MCGFailureInformation message for all MR-DC architectures | Huawei, HiSilicon | imported from 3GU |
R2‑1910944 | Draft CR on 36.331 to support MCG failure recovery via split SRB1 for (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910945 | Draft CR on 38.331 to support MCG failure recovery via split SRB1 for NE-DC/NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910946 | Need for a guard timer for fast MCG recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1910947 | Guard timer for fast MCG link recovery (impacts to 36.331) | Huawei, HiSilicon | imported from 3GU |
R2‑1910948 | Guard timer for fast MCG link recovery (impacts to 38.331) | Huawei, HiSilicon | imported from 3GU |
R2‑1910949 | PCell failure recovery via SCell | Huawei, HiSilicon | imported from 3GU |
R2‑1910950 | Relying on RAN4 requirements to prevent outdated measurement reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1910951 | LS to RAN4 on early measurement requirements | Huawei, HiSilicon | imported from 3GU |
R2‑1910952 | Early measurement for LTE IDLE with suspended RRC connection and LTE RRC_INACTIVE | Huawei, HiSilicon | imported from 3GU |
R2‑1910953 | Primary path switch during fast MCG failure recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1910954 | Further considerations on validity area | Huawei, HiSilicon | imported from 3GU |
R2‑1910955 | Early measurements in RRC_IDLE and inter-RAT cell reselection | Huawei, HiSilicon | imported from 3GU |
R2‑1910956 | NR group specific cell configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910957 | Draft CR to TS 38.300 for NR group specific cell configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910958 | Draft CR to TS 38.331 for NR group specific cell configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910959 | Draft CR to TS 36.331 for NR group specific cell configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1910960 | Collision of WUS and DRX Active time | InterDigital | imported from 3GU |
R2‑1910961 | Summary of Email Discussion [106_73][NRNTN] Mobility issues and solutions | InterDigital | imported from 3GU |
R2‑1910962 | TP on NTN Mobility Issues and Solutions | InterDigital | imported from 3GU |
R2‑1910963 | CR on PDCP security issue | Samsung Research America | imported from 3GU |
R2‑1910964 | Discussion on collision issue between uplink grants with the same HARQ PID | LG Electronics Inc. | imported from 3GU |
R2‑1910965 | Simultaneous use of mode 1 and mode 2 | KT Corp. | imported from 3GU |
R2‑1910966 | MAC CE design on single PDCCH based multi-TRP/panel transmission | NTT DOCOMO, INC. | imported from 3GU |
R2‑1910967 | Discussion on offset for drx-HARQ-RTT-Timer | LG Electronics Inc. | imported from 3GU |
R2‑1910968 | Discussion on UDC reconfiguration for RRC connection reestablishment case | Huawei, HiSilicon | imported from 3GU |
R2‑1910969 | UDC reconfiguration for RRC connection re-establishment case | Huawei, HiSilicon, CATT, MediaTek Inc. | imported from 3GU |
R2‑1910970 | Discussion on the signalling for LTE high speed | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1910971 | Discussion regarding RAN1 LS on wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1910972 | Introduction of wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1910973 | Introduction of wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1910974 | [Draft] Reply LS on wideband PRG size | Huawei [To be RAN2] | imported from 3GU |
R2‑1910975 | Fallback procedure for INACTIVE mode | Samsung Research America | imported from 3GU |
R2‑1910976 | Discussion on de-prioritized MAC PDU on CG resource | LG Electronics Inc. | imported from 3GU |
R2‑1910977 | Support of E-UTRA SCG maximum power configuration in NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1910978 | Discussion on both CG timer and CG retx timer in NR-U | LG Electronics Inc. | imported from 3GU |
R2‑1910979 | Support for broadcast of assistance data in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1910980 | UDC header handling for NR UDC | Samsung Research America | imported from 3GU |
R2‑1910981 | Discussion on contention resolution timer in NR-U | LG Electronics Inc. | imported from 3GU |
R2‑1910982 | Feedback for EHC algorithm | Samsung Research America | imported from 3GU |
R2‑1910983 | Corrections to SIB12 for CMAS geo-fencing | Nokia, Nokia Shanghai Bell, AT&T, Ericsson, Qualcomm Inc., Sprint, T-Mobile USA, Verizon Wireless | imported from 3GU |
R2‑1910984 | Discussion on MsgA payload rebuilding issue | LG Electronics Inc. | imported from 3GU |
R2‑1910985 | Corrections to SIB8 for CMAS geo-fencing | Nokia, Nokia Shanghai Bell, AT&T, Ericsson, Qualcomm Inc., Sprint, T-Mobile USA, Verizon Wireless | imported from 3GU |
R2‑1910986 | Discussion on MDT configurations from OAM and CN | Huawei, HiSilicon | imported from 3GU |
R2‑1910987 | Discussion on out of coverage enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1910988 | Discussion on UE selection in MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1910989 | Discussion on UE capabilities for MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1910990 | Stage-2 CR on delay measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1910991 | Stage-3 CR on delay measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1910992 | Discussion on RAN2 impacts due to other RAN3 led topics | Huawei, HiSilicon | imported from 3GU |
R2‑1910993 | Discussion on RLF reporting for inter-RAT case | Huawei, HiSilicon | imported from 3GU |
R2‑1910994 | Stage-2 CR on RLF reporting for inter-RAT case | Huawei, HiSilicon | imported from 3GU |
R2‑1910995 | Stage-3 CR on RLF reporting for inter-RAT case | Huawei, HiSilicon | imported from 3GU |
R2‑1910996 | Stage-2 CR on RLF reporting for inter-RAT case | Huawei, HiSilicon | imported from 3GU |
R2‑1910997 | Stage-3 CR on RLF reporting for inter-RAT case | Huawei, HiSilicon | imported from 3GU |
R2‑1910998 | Discussion on RAN3 impacts due to mobility history information in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1910999 | Discussion on mobility history information for MDT purpose | Huawei, HiSilicon | imported from 3GU |
R2‑1911000 | Consideration on PDCCH-based power saving signals | LG Electronics Inc. | imported from 3GU |
R2‑1911001 | EHC header handling for IIoT | Samsung Research America | imported from 3GU |
R2‑1911002 | Consideration on UE assistance information | LG Electronics Inc. | imported from 3GU |
R2‑1911003 | Extension of cases for the prioritized RACH | Huawei, HiSilicon | imported from 3GU |
R2‑1911004 | Enhancement on the backoff of Msg1 based SI request | Huawei, HiSilicon | imported from 3GU |
R2‑1911005 | Enhancement on BSR format for the one LCG case | Huawei, HiSilicon | imported from 3GU |
R2‑1911006 | Potential solutions for fast SCell activation | LG Electronics Inc. | imported from 3GU |
R2‑1911007 | Report for email discussion [106#51][NR-U] Configured Grant (LG) | LG Electronics Inc. | imported from 3GU |
R2‑1911008 | Multiple MIMO layer configuration for power saving | LG Electronics Inc. | imported from 3GU |
R2‑1911009 | Overview on CLI Measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1911010 | Discussion on measurement report for CLI | Huawei, HiSilicon | imported from 3GU |
R2‑1911011 | Discussion on CLI measurement configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1911012 | UE capability for CLI Measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1911013 | Discussion on handling of exceptional configuration for CLI measurement | Huawei, HiSilicon | imported from 3GU |
R2‑1911014 | Introduction of UE capability for CLI | Huawei, HiSilicon | imported from 3GU |
R2‑1911015 | Introduction of UE capability for CLI | Huawei, HiSilicon | imported from 3GU |
R2‑1911016 | Introduction of cross link interference management | Huawei, HiSilicon | imported from 3GU |
R2‑1911017 | Introduction of cross link interference management | Huawei, HiSilicon | imported from 3GU |
R2‑1911018 | Corrections on RRC reconfiguration with the fullConfig | Huawei, HiSilicon | imported from 3GU |
R2‑1911019 | Corrections on the PDCP SN size | Huawei, HiSilicon | imported from 3GU |
R2‑1911020 | Corrections on the condition of RBTermChange | Huawei, HiSilicon | imported from 3GU |
R2‑1911021 | Correction on SN size of SRB | Huawei, HiSilicon | imported from 3GU |
R2‑1911022 | Unnecessary deciphering for duplicated PDUs | Samsung Research America | imported from 3GU |
R2‑1911023 | Clarification of aggregated bandwidth for overheating | Huawei, HiSilicon | imported from 3GU |
R2‑1911024 | CR on clarification of aggregated bandwidth for overheating | Huawei, HiSilicon | imported from 3GU |
R2‑1911025 | CR on BWCS for inter-ENDC BC with intra-ENDC BC | Huawei, HiSilicon | imported from 3GU |
R2‑1911026 | Draft LS on BCS for inter-ENDC BC with intra-ENDC BC | Huawei, HiSilicon | imported from 3GU |
R2‑1911027 | Correction on codebookParameters in 38.306 | Huawei, HiSilicon | imported from 3GU |
R2‑1911028 | Correction on UE capability related to beam management | Huawei, HiSilicon | imported from 3GU |
R2‑1911029 | Clarification on the feature set report in EUTRAN | Huawei, HiSilicon | imported from 3GU |
R2‑1911030 | Email discussion report on 106#33 selectedBandEntriesMN | Huawei, HiSilicon | imported from 3GU |
R2‑1911031 | Clarification on the selectedBandEntriesMN - Understanding 1 | Huawei, HiSilicon | imported from 3GU |
R2‑1911032 | Clarification on the selectedBandEntriesMN - Understanding 2 | Huawei, HiSilicon | imported from 3GU |
R2‑1911033 | Discussion on CA parameters in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911034 | Correction on CA parameters in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911035 | 38.306 CR on PDCCH blind decoding in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911036 | Further considerations on overheating issue in EN-DC scenario | Huawei, Huawei Device, CMCC, China Unicom, China Telecom, MediaTek Inc., Samsung, LG Uplus, vivo | imported from 3GU |
R2‑1911037 | 36.331 CR for addressing overheating issue in EN-DC scenario - Option 1 | Huawei, Huawei Device, MediaTek Inc., Samsung | imported from 3GU |
R2‑1911038 | 38.331 CR for addressing overheating issue in EN-DC sceanrio - Option 1 | Huawei, Huawei Device, MediaTek Inc., Samsung | imported from 3GU |
R2‑1911039 | 36.331 CR for addressing overheating issue in EN-DC scenario - Option 2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
R2‑1911040 | 37.340 CR for addressing overheating issue in EN-DC scenario - Option 2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
R2‑1911041 | 38.331 CR for addressing overheating issue in EN-DC scenario - Option 2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
R2‑1911042 | Discussion on reduced SRS antenna switching | Huawei, HiSilicon | imported from 3GU |
R2‑1911043 | CR for reduced SRS antenna switching – Solution 1 | Huawei, HiSilicon | imported from 3GU |
R2‑1911044 | CR for reduced SRS antenna switching – Solution 2 | Huawei, HiSilicon | imported from 3GU |
R2‑1911045 | On the Relation between BWP configuration and supported featureset | Huawei, HiSilicon | imported from 3GU |
R2‑1911046 | CR on UE capability for SRS carrier switching | Huawei, HiSilicon | imported from 3GU |
R2‑1911047 | Remaining issues on UE capability segmentation | Huawei, HiSilicon | imported from 3GU |
R2‑1911048 | Capability indication of supporting segmentation | Huawei, HiSilicon | imported from 3GU |
R2‑1911049 | On the interleaving between RRC segments and other messages | Huawei, HiSilicon | imported from 3GU |
R2‑1911050 | Consideration on the delta signalling of UE capability ID | Huawei, HiSilicon | imported from 3GU |
R2‑1911051 | Draft LS to SA2 on delta signalling | Huawei, HiSilicon | imported from 3GU |
R2‑1911052 | CR on unnecessary deciphering for duplicated PDU | Samsung Research America | imported from 3GU |
R2‑1911053 | Discussion on conditional handover | SHARP Corporation | imported from 3GU |
R2‑1911054 | PLMN and cell selection for NPN | Huawei, HiSilicon | imported from 3GU |
R2‑1911055 | Discussion on handover cases | Huawei, HiSilicon | imported from 3GU |
R2‑1911056 | Enhancement for ANR | Huawei, HiSilicon | imported from 3GU |
R2‑1911057 | Discussion on RRC configuration for PLMN and NPN with RAN sharing and Dual radio | Huawei, HiSilicon | imported from 3GU |
R2‑1911058 | Discussion on conditional handover | SHARP Corporation | imported from 3GU |
R2‑1911059 | Consideration on handling consistent UL LBT failures | ETRI | imported from 3GU |
R2‑1911060 | Report of Email discussion [106#67][R16 eMTC] How to acquire ETWS/CMAS information | LG Electronics UK | imported from 3GU |
R2‑1911061 | Remaining issues of ETWS/CMAS information acquisition | LG Electronics UK | imported from 3GU |
R2‑1911062 | Draft LS on ETWS_CMAS notification | LG Electronics UK | imported from 3GU |
R2‑1911063 | RA procedure fallback in Msg2 based MT EDT | LG Electronics UK | imported from 3GU |
R2‑1911064 | Discussion on D-PUR procedure | LG Electronics UK | imported from 3GU |
R2‑1911065 | Support for S-PUR | LG Electronics UK | imported from 3GU |
R2‑1911066 | Backhaul RLF Notification and Recovery Procedure | Futurewei Technologies | imported from 3GU |
R2‑1911067 | Reliability enhancements for NR sidelink broadcast | Huawei, HiSilicon | imported from 3GU |
R2‑1911068 | HARQ related identifier assignment for Option2 groupcast mechanism | Huawei, HiSilicon | imported from 3GU |
R2‑1911069 | Discussion on HARQ support for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1911070 | Further consideration on HARQ support for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1911071 | Discussion on HARQ feedback enable and disable | Huawei, HiSilicon | imported from 3GU |
R2‑1911072 | Discussion on Sidelink Configured Grant support | Huawei, HiSilicon | imported from 3GU |
R2‑1911073 | Considerations on sidelink for handling Uu interruptions | Huawei, HiSilicon | imported from 3GU |
R2‑1911074 | Considerations on RLM for NR V2X unicast | Huawei, HiSilicon | imported from 3GU |
R2‑1911075 | QoS monitoring and reporting for NR Sidelink V2X Communication | Huawei, HiSilicon | imported from 3GU |
R2‑1911076 | AS-related group communication for platooning | Huawei, HiSilicon | imported from 3GU |
R2‑1911077 | The enhancement of Uu to control inter-RAT V2X sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1911078 | Reply LS on protection of PC5-RRC messages for sidelink unicast communication | Huawei [To be RAN2] | imported from 3GU |
R2‑1911079 | Support of RLC AM for Sidelink unicast | Huawei, HiSilicon | imported from 3GU |
R2‑1911080 | Relationship between PC5-RRC connection and PC5-S connection | Huawei, HiSilicon | imported from 3GU |
R2‑1911081 | SLRB handling in the case of RRC state or coverage status change | Huawei, HiSilicon | imported from 3GU |
R2‑1911082 | Considerations on UE-based PDCP Duplication Enhancements | III | imported from 3GU |
R2‑1911083 | Discussion about mode coexistence for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1911084 | Cell reselection for V2X SL communication in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1911085 | On PC5 Availability Unavailability for NR SL unicast | Huawei, HiSilicon | imported from 3GU |
R2‑1911086 | Discussion on the default DRB for NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1911087 | On reception of MAC PDU in NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1911088 | Discussion on mobility enhancement for mode-1 | Huawei, HiSilicon | imported from 3GU |
R2‑1911089 | Discussion on mobility enhancement for mode-2 | Huawei, HiSilicon | imported from 3GU |
R2‑1911090 | Remaining issue on sidelink LCP procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1911091 | Relative QoS handling between NR SL and NR Uu | Huawei, HiSilicon | imported from 3GU |
R2‑1911092 | Discussion on SLRB configuration via SIB | Huawei, HiSilicon | imported from 3GU |
R2‑1911093 | Discussion on related aspects of system information | Huawei, HiSilicon | imported from 3GU |
R2‑1911094 | Further details of NR Sidelink UE information procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1911095 | On the CBR measurment and reporting in Uu for NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1911096 | Support of PC5 capability exchange | Huawei, HiSilicon | imported from 3GU |
R2‑1911097 | On SLRB establishment procedures | Huawei, HiSilicon | imported from 3GU |
R2‑1911098 | Discussion on SLRB configuration via RRC | Huawei, HiSilicon | imported from 3GU |
R2‑1911099 | Support of inter-carrier configuration for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1911100 | On SDAP entity for NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1911101 | Handling of Persistent LBT Failures in NR-U | Charter Communications, Inc | imported from 3GU |
R2‑1911102 | Discussion on V2X Specific Validity Area | Samsung R&D Institute UK | imported from 3GU |
R2‑1911103 | UE report to assist NG-RAN scheduling | Samsung R&D Institute UK | imported from 3GU |
R2‑1911104 | System Information Transmission in NR-U | Charter Communications, Inc | imported from 3GU |
R2‑1911105 | Sidelink and Uplink Prioritization | Samsung R&D Institute UK | imported from 3GU |
R2‑1911106 | Sidelink Resouce Poll Configuration | Samsung R&D Institute UK | imported from 3GU |
R2‑1911107 | Paging Monitoring in NR-U | Charter Communications, Inc | imported from 3GU |
R2‑1911108 | Sidelink HARQ Feedback Configuration | Samsung R&D Institute UK | imported from 3GU |
R2‑1911109 | NR RLF-related Considerations to Report | LG Electronics Inc. | imported from 3GU |
R2‑1911110 | Signalling Delay in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1911111 | CHO Executing Loop Issue when HOF | LG Electronics Inc. | imported from 3GU |
R2‑1911112 | Legacy HO and Configuration Handling Issues | LG Electronics Inc. | imported from 3GU |
R2‑1911113 | RACH-less Handling when CHO Execution | LG Electronics Inc. | imported from 3GU |
R2‑1911114 | RLM Handling of Enhanced MBB HO | LG Electronics Inc. | imported from 3GU |
R2‑1911115 | CHO Executing Loop Issue when HOF | LG Electronics Inc. | imported from 3GU |
R2‑1911116 | Legacy HO and Configuration Handling Issues | LG Electronics Inc. | imported from 3GU |
R2‑1911117 | RLM Handling of Enhanced MBB HO | LG Electronics Inc. | imported from 3GU |
R2‑1911118 | Sidelink RAT Selection | Samsung R&D Institute UK | imported from 3GU |
R2‑1911119 | Aperiodic traffic pattern support in UE Assistance Information | Samsung R&D Institute UK | imported from 3GU |
R2‑1911120 | Congestion control in NR-V2X | Samsung R&D Institute UK | imported from 3GU |
R2‑1911121 | SDAP Configuration for NR Sidelink | Samsung R&D Institute UK | imported from 3GU |
R2‑1911122 | Discussion on Default SLRB configuration | Samsung R&D Institute UK | imported from 3GU |
R2‑1911123 | Intra-UE prioritization for conflict UL grants | III | imported from 3GU |
R2‑1911124 | SR and PUSCH prioritization | III | imported from 3GU |
R2‑1911125 | On SL HARQ | MediaTek Inc. | imported from 3GU |
R2‑1911126 | Summary of Email discussion for [106#79][NR/V2X] Exceptional TX resource pool | MediaTek Inc. | imported from 3GU |
R2‑1911127 | Remaining issues of SL LCP | MediaTek Inc. | imported from 3GU |
R2‑1911128 | On SL configured grant | MediaTek Inc. | imported from 3GU |
R2‑1911129 | Support multi-TRP/panel transmission | MediaTek Inc. | imported from 3GU |
R2‑1911130 | Correction on the signalling design for positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1911131 | RRC release for User Plane EDT | III | imported from 3GU |
R2‑1911132 | RRC release for User Plane EDT | III | imported from 3GU |
R2‑1911133 | Consideration of beam aspects in NR CHO | China Telecom | imported from 3GU |
R2‑1911134 | UE capabilities for DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1911135 | Draft CR on 36.331 to add UE capabilities for DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1911136 | Draft CR on 38.331 to add UE capabilities DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1911137 | Draft CR on 36.306 to add UE capabilities for DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1911138 | Draft CR on 38.306 to add UE capabilities for DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1911139 | Direct SCell state configuration for RRC resume | Huawei, HiSilicon | imported from 3GU |
R2‑1911140 | Draft CR on TS 36.331 to support direct SCell state configuration for RRC resume | Huawei, HiSilicon | imported from 3GU |
R2‑1911141 | Fast SN addition and SCell activation via early measurement reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1911142 | Draft CR on TS 37.340 for fast SN addition and SCell activation via early measurement reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1911143 | Discussion on MCG RLF due to UL problems when both UL and SUL are configured | Huawei, HiSilicon | imported from 3GU |
R2‑1911144 | Discussion on MCG failure recovery via SRB3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911145 | [Draft] LS to RAN3 on support of MCG failure recovery via SRB3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911146 | Draft CR on 37.340 for support of MCG link fast recovery via SRB3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911147 | Draft CR on TS 38.331 to support MCG failure recovery via SRB3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911148 | Draft CR on TS 36.331 to support MCG failure recovery via SRB3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911149 | Enabling MN change without releasing SCG link | Huawei, HiSilicon | imported from 3GU |
R2‑1911150 | Early measurement reporting before MSG4 for RRC_INACTIVE | Huawei, HiSilicon | imported from 3GU |
R2‑1911151 | Support blind SN resume before sending RRCResume message | Huawei, HiSilicon | imported from 3GU |
R2‑1911152 | Draft CR on TS 37.340 to support blind SN resume before sending RRCResume message | Huawei, HiSilicon | imported from 3GU |
R2‑1911153 | [Draft] LS to RAN3 on support of blind SN resume before sending RRCResume message | Huawei, HiSilicon | imported from 3GU |
R2‑1911154 | Fast SCG suspension and resumption in RRC_CONNECTED state | Huawei, HiSilicon | imported from 3GU |
R2‑1911155 | RAN2 impact to support Cross-Carrier scheduling with different numerologies | Huawei, HiSilicon | imported from 3GU |
R2‑1911156 | Draft CR to 38.331 for introducing Cross-Carrier scheduling with different numerologies | Huawei, HiSilicon | imported from 3GU |
R2‑1911157 | Discussion on human-readable name of NPN | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1911158 | Running 36.300 CR for LTE_feMob | China Telecom Corporation Ltd. | imported from 3GU |
R2‑1911159 | Discussion on mobility interuption solutions in NR | China Telecom | imported from 3GU |
R2‑1911160 | Further details on CHO in NR | China Telecom | imported from 3GU |
R2‑1911161 | Correction on PSCell change | LG Electronics Inc. | imported from 3GU |
R2‑1911162 | LTE to NR-DC Inter-RAT HO support | Qualcomm Incorporated | imported from 3GU |
R2‑1911163 | Discussion on Rel. 16 Gapless measurement | Qualcomm Incorporated | imported from 3GU |
R2‑1911164 | Correction on SCG release | LG Electronics Inc. | imported from 3GU |
R2‑1911165 | Discussion on the deployment for CAG | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1911166 | Further details of UE assistance information procedure for NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1911167 | Discussion on the handling of consistent UL LBT Failure | Huawei, HiSilicon | imported from 3GU |
R2‑1911168 | LS on UL LBT failure | Huawei, HiSilicon | imported from 3GU |
R2‑1911169 | Discussion on configured grant for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911170 | Discussion on the colission between NR-U configured and dynamic grant | Huawei, HiSilicon | imported from 3GU |
R2‑1911171 | Discussion on DRX for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911172 | Discussion on DRX with cross-COT HARQ feedback | Huawei, HiSilicon | imported from 3GU |
R2‑1911173 | Draft LS on cross-COT HARQ feedback | Huawei, HiSilicon | imported from 3GU |
R2‑1911174 | Discussion on SR for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911175 | Discussion on wideband operation for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911176 | BWP aspect of cross-COT HARQ feedback for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911177 | SCell aspect of cross-COT HARQ feedback for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911178 | TP on stage 2 UL LBT failure | Huawei, HiSilicon | imported from 3GU |
R2‑1911179 | Discussion on Msg1 transmission in NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911180 | Correction on msg1 aspects | Huawei, HiSilicon | imported from 3GU |
R2‑1911181 | Draft CR on the RA-RNTI calcualtion | Huawei, HiSilicon | imported from 3GU |
R2‑1911182 | Discussion on contention resolution timer in NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911183 | Discussion on additional opportunities for Msg3 transmission in NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911184 | Discussion on RA-RNTI calculation in NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911185 | Discussion on Two step RACH for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911186 | Discussion on indication of LBT type in msg3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911187 | Discussion on multiple Msg1 transmissions | Huawei, HiSilicon | imported from 3GU |
R2‑1911188 | Correction on SCG measurement release in NE-DC | LG Electronics Inc. | imported from 3GU |
R2‑1911189 | Support of Inter-RAT HO between NR to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1911190 | Study on application of CHO mechanism to Conditional PSCell addition/change | NTT DOCOMO INC. | imported from 3GU |
R2‑1911191 | Discussion on SFTD measurement | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1911192 | Draft reply LS to RAN4 on SFTD measurement | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1911193 | CR to 38.331 on SFTD measurement | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1911194 | CR to 38.306 on SFTD capability | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1911195 | Recovery from the consistent uplink LBT failures | LG Electronics Inc. | imported from 3GU |
R2‑1911196 | Detection of the consistent uplink LBT failures | LG Electronics Inc. | imported from 3GU |
R2‑1911197 | Draft LS on handling of the consistent uplink LBT failure | LG Electronics Inc. | imported from 3GU |
R2‑1911198 | Additional opportunity for Msg1 in 4-step RACH | LG Electronics Inc. | imported from 3GU |
R2‑1911199 | Measurement enhancement for channel occupancy | LG Electronics Inc. | imported from 3GU |
R2‑1911200 | Joint activation of multiple CG, SPS configurations | LG Electronics Inc. | imported from 3GU |
R2‑1911201 | CG confirmation MAC CE for multiple CG configurations | LG Electronics Inc. | imported from 3GU |
R2‑1911202 | Mapping between uplink grant and logical channel | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1911203 | Prioritization for overlapping PUSCH resources | LG Electronics Inc. | imported from 3GU |
R2‑1911204 | Scheduling of retransmission for the deprioritized MAC PDU | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1911205 | MAC PDU delivery with priority information | LG Electronics Inc. | imported from 3GU |
R2‑1911206 | Prioritization between MAC CE and urgent data | LG Electronics Inc. | imported from 3GU |
R2‑1911207 | Impact of intra-UE prioritization on SR cancellation | LG Electronics Inc. | imported from 3GU |
R2‑1911208 | Enhancement for CG confirmation MAC CE | LG Electronics Inc. | imported from 3GU |
R2‑1911209 | Discussion on HARQ process collision between CG and DG | Huawei, HiSilicon | imported from 3GU |
R2‑1911210 | Prioritization in LCP between MAC CEs and URLLC data | Huawei, HiSilicon | imported from 3GU |
R2‑1911211 | PDCP Duplication leftover enhancements to RLC | Huawei, HiSilicon | imported from 3GU |
R2‑1911212 | Header compression in BAP layer | Huawei, HiSilicon | imported from 3GU |
R2‑1911213 | Remaining issues on flow control | Huawei, HiSilicon | imported from 3GU |
R2‑1911214 | Bearer mapping for control plane signalling | Huawei, HiSilicon | imported from 3GU |
R2‑1911215 | BAP layer header content design | Huawei, HiSilicon | imported from 3GU |
R2‑1911216 | Specification impacts about IP address management for IAB nodes | Huawei, HiSilicon | imported from 3GU |
R2‑1911217 | On the consideration of routing for reporting pre-emptive BSR | ASUSTeK | imported from 3GU |
R2‑1911218 | Discussion on traditional uplink and IAB uplink traffic for BSR triggering | ASUSTeK | imported from 3GU |
R2‑1911219 | SR configuration for pre-emptive BSR | ASUSTeK | imported from 3GU |
R2‑1911220 | Discussion on routing update upon backhaul link recovery | ASUSTeK | imported from 3GU |
R2‑1911221 | Discussion on SCCH configuration | ASUSTeK | imported from 3GU |
R2‑1911222 | Discussion on handling multiple SL communication | ASUSTeK | imported from 3GU |
R2‑1911223 | Discussion on resource allocation for sidelink HARQ ACK/NACK report | ASUSTeK | imported from 3GU |
R2‑1911224 | Discussion on sidelink RLM indication | ASUSTeK | imported from 3GU |
R2‑1911225 | Discussion on requesting and releasing SLRB configuration | ASUSTeK | imported from 3GU |
R2‑1911226 | Discussion on association between sidelink data and resource allocation modes | ASUSTeK | imported from 3GU |
R2‑1911227 | Discussion on RACH-less handover for NR | ASUSTeK | imported from 3GU |
R2‑1911228 | DRX timer operation in multi-TB scheduling | ASUSTeK | imported from 3GU |
R2‑1911229 | Buffer status indicated by BSR in multi-TB scheduling | ASUSTeK | imported from 3GU |
R2‑1911230 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1911231 | RLF notification to downstream node in IAB | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1911232 | [Draft] Reply LS on bulk authentication issue for IoT devices | Huawei | imported from 3GU |
R2‑1911233 | Random access without location information | Huawei, HiSilicon | imported from 3GU |
R2‑1911234 | Random access with UE location information | Huawei, HiSilicon | imported from 3GU |
R2‑1911235 | RACH configuration and utilization in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911236 | Discussion on disabling HARQ in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911237 | Discussion on HARQ enhancement in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911238 | Discussion on HARQ RTT timers in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911239 | Further discussion on scheduling in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911240 | Minimized function for GEO scenario in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911241 | Discussion on the impact of WUS to the C-DRX | Huawei, HiSilicon | imported from 3GU |
R2‑1911242 | Misdetection of PDCCH-based power saving signal | Huawei, HiSilicon | imported from 3GU |
R2‑1911243 | WUS collision with DRX active time | Huawei, HiSilicon | imported from 3GU |
R2‑1911244 | Discussion on WUS monitoring | Huawei, HiSilicon | imported from 3GU |
R2‑1911245 | Enabling of power saving signal related scheme | Huawei, HiSilicon | imported from 3GU |
R2‑1911246 | Discussion on efficient RRC state transition | Huawei, HiSilicon | imported from 3GU |
R2‑1911247 | Discussion on MIMO layer adaptation | Huawei, HiSilicon | imported from 3GU |
R2‑1911248 | UE assistance information for power saving | Huawei, HiSilicon, vivo | imported from 3GU |
R2‑1911249 | Procedural aspects of assistance information reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1911250 | UE assistance information in MR-DC | Huawei, Huawei Device, CMCC, MediaTek Inc., China Telecom, LG Uplus, vivo | imported from 3GU |
R2‑1911251 | On-demand SI for positioning assistance data in RRC_IDLE and RRC_INACTIVE | Huawei, HiSilicon | imported from 3GU |
R2‑1911252 | Draft Reply LS on UE-based positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1911253 | Mobility-state-based cell reselection in NR for HSDN | CMCC, MediaTek Inc. | imported from 3GU |
R2‑1911254 | Discussion on QoS reporting and SLRB establishment | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911255 | Discussion on QoS reporting and SLRB establishment | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911256 | Discussion on QoS reporting and SLRB establishment | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911257 | RAN2 work plan for eURLLC | Huawei, HiSilicon | imported from 3GU |
R2‑1911258 | Discussion on RAN2 impact of PUSCH enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1911259 | Considerations on out-of-order HARQ issues | Huawei, HiSilicon | imported from 3GU |
R2‑1911260 | Draft LS on overlapping SPS PDSCH and dynamic PDSCH | Huawei, HiSilicon | imported from 3GU |
R2‑1911261 | Discussion on potential improvements for delay critical QoS flows | Huawei, HiSilicon | imported from 3GU |
R2‑1911262 | Draft Reply LS on potential improvements for delay critical QoS flows | Huawei, HiSilicon | imported from 3GU |
R2‑1911263 | Upgrading support of multi-QoS profile | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1911264 | Draft Reply LS on QoS Handling for V2X Communication Over Uu | Huawei, HiSilicon | imported from 3GU |
R2‑1911265 | Discussion on enabling Truncated BSR for Regular and Periodic BSR | Huawei, HiSilicon | imported from 3GU |
R2‑1911266 | Enhancements to enabling Truncated BSR for Regular and Periodic BSR | Huawei, HiSilicon | imported from 3GU |
R2‑1911267 | Discussion on NR V2X sidelink UE information | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911268 | Generic Procedure for on-demand SI in RRC_CONNECTED | CATT | imported from 3GU |
R2‑1911269 | Discussion on the WUS linked to C-DRX Ondurations | Xiaomi Communications | imported from 3GU |
R2‑1911270 | RACH backoff for LEO mobility | Ericsson | imported from 3GU |
R2‑1911271 | CHO for NTN | Ericsson | imported from 3GU |
R2‑1911272 | Location reporting for NTN | Ericsson | imported from 3GU |
R2‑1911273 | Service continuity for NTN | Ericsson | imported from 3GU |
R2‑1911274 | Make before break for NTN | Ericsson | imported from 3GU |
R2‑1911275 | Simulations on WUS not applying to the DRX short cycles | Xiaomi Communications | imported from 3GU |
R2‑1911276 | Updates to reestablishment procedure | ZTE Corporation, Sanechips, Intel Corporation | imported from 3GU |
R2‑1911277 | Simulations on WUS not applying to the DRX short cycles | Xiaomi Communications | imported from 3GU |
R2‑1911278 | Correction on RRC connection release indication after handover | Google Inc. | imported from 3GU |
R2‑1911279 | 38.306 miscellaneous corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911280 | Corrections on SIB1 configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1911281 | Correction on RRC connection release indication after handover | Google Inc. | imported from 3GU |
R2‑1911282 | Correction on 5GC to EPC inter-RAT inter-system handover | SHARP Corporation, Nokia | imported from 3GU |
R2‑1911283 | NR eMOB solutions to achieve 0ms interruption time | SHARP Corporation | imported from 3GU |
R2‑1911284 | Considerations on UE power saving for BWP scenarios | Xiaomi Communications | imported from 3GU |
R2‑1911285 | Correction on RRC Resume processing delay | Google Inc. | imported from 3GU |
R2‑1911286 | Discussion on LCP procedure for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911287 | Correction on stop condition of T380 | LG Electronics Inc. | imported from 3GU |
R2‑1911288 | Discussion on WUS missing problems during BWP switching and handover | Xiaomi Communications | imported from 3GU |
R2‑1911289 | Discussion on Satellite beams and their mapping to NR cells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911290 | CHO UE behaviour upon transitioning to RRC_INACTIVE | Samsung R&D Institute India | imported from 3GU |
R2‑1911291 | Some issues on the WUS working with C-DRX | Xiaomi Communications | imported from 3GU |
R2‑1911292 | Support of RACHless HO in NR | Samsung R&D Institute India | imported from 3GU |
R2‑1911293 | Considerations on handling early measurement results in NR | LG Electronics Inc. | imported from 3GU |
R2‑1911294 | Considerations on validity area in NR | LG Electronics Inc. | imported from 3GU |
R2‑1911295 | Considerations on CHO in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1911296 | Remaining issues of tracking area management in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1911297 | Report on email discussion_106#74_NTN_Cell selection&reselection | LG Electronics Inc. | imported from 3GU |
R2‑1911298 | Dual connectivity use cases in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1911299 | RRM measurement relaxation on a frequency based on the cell quality | LG Electronics Inc. | imported from 3GU |
R2‑1911300 | Discussion on upper-layer procedures for WUS | Qualcomm Inc | imported from 3GU |
R2‑1911301 | Procedure for efficient transition of RRC CONNECTED | Qualcomm Inc, Apple | imported from 3GU |
R2‑1911302 | Adaptation of maximum MIMO layer | Qualcomm Inc | imported from 3GU |
R2‑1911303 | UE assistance information for power saving | Qualcomm Inc, Apple | imported from 3GU |
R2‑1911304 | UE indication on expected data | Qualcomm Inc, Apple | imported from 3GU |
R2‑1911305 | Correction to PHR in dual connectivity | Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1911306 | Correction to semi-persistent CSI report in DRX | Qualcomm Inc, Nokia, Nokia Shanghai Bell, OPPO | imported from 3GU |
R2‑1911307 | Backoff indication in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1911308 | Enhancements to PHR in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1911309 | Specification Impacts to specify Single Stack solution for NR | Samsung R&D Institute India | imported from 3GU |
R2‑1911310 | Down-selecting non-DC based solution for NR eMOB | Samsung R&D Institute India | imported from 3GU |
R2‑1911311 | Discussion on signalling to enable NPN/CAG support in NR | Samsung R&D Institute India | imported from 3GU |
R2‑1911312 | Discussion on Private Network Support for NG-RAN | Samsung R&D Institute India | imported from 3GU |
R2‑1911313 | Discussion on NeedForGap capability support in Release 16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911314 | Utilization of MCG Failure Recovery via SCG link | LG Electronics Inc | imported from 3GU |
R2‑1911315 | Support of Conditional PSCell addition/change | NTT DOCOMO INC. , Nokia, Ericsson, Fujitsu, KT Corp, Media Tek Inc., NEC, Qualcomm Inc., SoftBank Corp. | imported from 3GU |
R2‑1911316 | Siganling design for on-demand SI requst and delivery in RRC_CONNECTED | Huawei, HiSilicon | imported from 3GU |
R2‑1911317 | Support NeedForGap capability for each supported NR band before EN-DC configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911318 | Discussion on Inter-RAT Cell Selection from NR to GSM/UTRAN | Samsung Electronics | imported from 3GU |
R2‑1911319 | Discussion on maxMIMO-Layers for the normal uplink and the supplementary uplink | Samsung Electronics | imported from 3GU |
R2‑1911320 | Discussion on unnecessary measurement reporting procedure for H1 and H2 events | Samsung Electronics | imported from 3GU |
R2‑1911321 | Bi-directional UE capability transfer procedure for NR V2X unicast | Samsung Electronics | imported from 3GU |
R2‑1911322 | Discussion on SLRB handling at transition from IDLE/INACTIVE to CONNECTED | Samsung Electronics | imported from 3GU |
R2‑1911323 | Handling of SLRB configuration for IDLE/INACTIVE UEs | Samsung Electronics | imported from 3GU |
R2‑1911324 | AS-layer configuration failure case in SL unicast | Samsung Electronics | imported from 3GU |
R2‑1911325 | Discussion on handling of PC5-S messages for NR V2X unicast | Samsung Electronics | imported from 3GU |
R2‑1911326 | Discussion on Sidelink UE Information Initiation Trigger for NR V2X Sidelink Communication | Samsung Electronics | imported from 3GU |
R2‑1911327 | Discussion on Support of Vulnerable Road User | Samsung Electronics | imported from 3GU |
R2‑1911328 | Interaction between RRC Connection Resume Condition and RNAU for NR V2X SL Communication | Samsung Electronics | imported from 3GU |
R2‑1911329 | Remaining Issues on SL RLM/RLF Declaration for NR V2X Unicast | Samsung Electronics | imported from 3GU |
R2‑1911330 | Fast autonomous resumption with stored CG configuration | LG Electronics Inc. | imported from 3GU |
R2‑1911331 | Study on application of CHO mechanism to Conditional PSCell addition/change | NTT DOCOMO INC. | imported from 3GU |
R2‑1911332 | Correction on inter-RAT cell re-selection when UE is in RRC_IDLE | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911333 | maxMIMO-Layers for the normal uplink and the supplementary uplink_Option 1 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911334 | LCID space extension and MAC format | LG Electronics Inc. | imported from 3GU |
R2‑1911335 | Consideration on LCG space extension | LG Electronics Inc. | imported from 3GU |
R2‑1911336 | Report on email discussion [106#47][IAB] Bearer Mapping | LG Electronics Inc. | imported from 3GU |
R2‑1911337 | [DRAFT] LS on CP bearer mapping for IAB | LG Electronics Inc. | imported from 3GU |
R2‑1911338 | LCG based UL grant | LG Electronics Inc. | imported from 3GU |
R2‑1911339 | BSR MAC CE format for pre-BSR | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1911340 | Further consideration on DL flow control | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1911341 | Consideration on local route selection in IAB node | LG Electronics Inc. | imported from 3GU |
R2‑1911342 | maxMIMO-Layers for the normal uplink and the supplementary uplink_Option 2 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911343 | The necessity of resume and release indication | LG Electronics Inc. | imported from 3GU |
R2‑1911344 | Support of Conditional PSCell addition/change | NTT DOCOMO INC., Nokia, Ericsson, Fujitsu, KT Corp, Media Tek Inc., NEC, Qualcomm Inc., SoftBank Corp. | imported from 3GU |
R2‑1911345 | Correction on H1 and H2 events | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911346 | Access barring for IAB-nodes | LG Electronics | imported from 3GU |
R2‑1911347 | 2-step RACH fall back to 4-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1911348 | Association between routing path and BH RLC channels | LG Electronics | imported from 3GU |
R2‑1911349 | msgB content in 2-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1911350 | Further discussion on the reliable transmission of F1-C message | LG Electronics | imported from 3GU |
R2‑1911351 | Discussion on TA command for RRC connected UE | Qualcomm Incorporated | imported from 3GU |
R2‑1911352 | Report of [106#39][NR/CLI] Measurement object and event triggers | LG Electronics Inc. | imported from 3GU |
R2‑1911353 | BH RLC channel configuration | LG Electronics | imported from 3GU |
R2‑1911354 | Support of BWP-based MIMO layer configurations | Samsung | imported from 3GU |
R2‑1911355 | SRB type for the segmented UECapabilityInformation | Samsung | imported from 3GU |
R2‑1911356 | Support and indication of UE capability segmentation | Samsung | imported from 3GU |
R2‑1911357 | Considerations for sidelink resource pool design for NR V2X | Samsung | imported from 3GU |
R2‑1911358 | Considerations to support mobility for NR V2X | Samsung | imported from 3GU |
R2‑1911359 | Support of Multiple Beam Indication for Multiple TRPs | Samsung | imported from 3GU |
R2‑1911360 | MAC CE design for support of multiple beam indication for multiple TRPs | Samsung | imported from 3GU |
R2‑1911361 | Further considerations on CLI measurement and report | Samsung | imported from 3GU |
R2‑1911362 | Discussion on the additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1911363 | Additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1911364 | Additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1911365 | RAR window for msgB reception and RNTI design for msgB | Qualcomm Incorporated | imported from 3GU |
R2‑1911366 | BAP header design | LG Electronics | imported from 3GU |
R2‑1911367 | Criteria for selecting 2-step RACH and 4-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1911368 | Discussion on using dedicated preamble for 2-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1911369 | Further discussion on load balancing | LG Electronics, LG Uplus | imported from 3GU |
R2‑1911370 | msgB packet format | Qualcomm Incorporated | imported from 3GU |
R2‑1911371 | Random Access Resource selection procedure for 2-step RACH | LG Electronics | imported from 3GU |
R2‑1911372 | Need for UE-based activation/deactivation of PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1911373 | MAC CE format for PDCP duplication activation/deactivation | LG Electronics Inc. | imported from 3GU |
R2‑1911374 | Per-packet selective PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1911375 | Enhanced TCI States Activation/Deactivation PDSCH MAC CE for Multi-TRP | Qualcomm Incorporated | imported from 3GU |
R2‑1911376 | Discussion on duplication of PDCP Control PDU | LG Electronics Inc. | imported from 3GU |
R2‑1911377 | Procedure and format for beam index indication MAC CE | Qualcomm Incorporated | imported from 3GU |
R2‑1911378 | Discussion on BFR in multi-TRP operation | Qualcomm Incorporated | imported from 3GU |
R2‑1911379 | Discussion on impact of multi-TRP operation on RAN2 | Qualcomm Incorporated | imported from 3GU |
R2‑1911380 | Configured Grant enhancements for TSC traffic | Sequans Communications | imported from 3GU |
R2‑1911381 | BSR operation with CA packet duplication | Sequans Communications | imported from 3GU |
R2‑1911382 | LCH restrictions for multiple CGs | Sequans Communications | imported from 3GU |
R2‑1911383 | Handling of collisions with a CG | Sequans Communications | imported from 3GU |
R2‑1911384 | Enhanced rescheduling for dropped CG | Sequans Communications | imported from 3GU |
R2‑1911385 | Handling of bundle collisions | Sequans Communications | imported from 3GU |
R2‑1911386 | On Inter-RAT assistance information for NB-IoT and LTE(-eMTC) | Sequans Communications | imported from 3GU |
R2‑1911387 | IAB with NSA operation | Sequans Communications | imported from 3GU |
R2‑1911388 | Support for LTE deployment at IAB node sites | Sequans Communications | imported from 3GU |
R2‑1911389 | Queue Management vs Flow Control for Congestion Handling | Sequans Communications | imported from 3GU |
R2‑1911390 | Header compression for IIoT | NTT DOCOMO INC. | imported from 3GU |
R2‑1911391 | Considerations on camping on non-best cell | LG Electronics Inc | imported from 3GU |
R2‑1911392 | Introduction of early RLF declaration or fast handover failure recovery for PSCell in MR-DC | Samsung Electronics Polska | imported from 3GU |
R2‑1911393 | SR for NTN | Ericsson | imported from 3GU |
R2‑1911394 | On GNSS-aided random access procedures for NTN | Ericsson | imported from 3GU |
R2‑1911395 | DRX enhancements for NTN | Ericsson | imported from 3GU |
R2‑1911396 | Introduction of T312 for IRAT EUTRA measurement in NR | Samsung Electronics Polska | imported from 3GU |
R2‑1911397 | Introduction of T312 for IRAT NR measurement in EUTRA | Samsung Electronics Polska | imported from 3GU |
R2‑1911398 | Introduction of early RLF declaration for PSCell in (NG)EN-DC | Samsung Electronics Polska | imported from 3GU |
R2‑1911399 | Discussion on fast RLF recovery enhancements in NR | Samsung Electronics Polska | imported from 3GU |
R2‑1911400 | Paging enhancements in NR-U | LG Electronics Inc | imported from 3GU |
R2‑1911401 | Discussion on RLM in LTE FeMOB | Samsung Electronics Polska | imported from 3GU |
R2‑1911402 | Dedicated preamble support in 2-step RACH | Fujitsu, Qualcomm Incorporated, OPPO | imported from 3GU |
R2‑1911403 | RSSI and channel occupancy measurements for serving frequency | LG Electronics Inc. | imported from 3GU |
R2‑1911404 | Considerations on simultaneous configuration of mode 1 and 2 | ITL | imported from 3GU |
R2‑1911405 | RRC connection re-establishment in NR-U | LG Electronics Inc. | imported from 3GU |
R2‑1911406 | Discussion on L2 Throughput Measurement | Samsung Electronics Polska | imported from 3GU |
R2‑1911407 | RLM/RLF enhancements in NR-U | LG Electronics Inc | imported from 3GU |
R2‑1911408 | Request and reception of on-demand SI in RRC CONNECTED | LG Electronics Inc. | imported from 3GU |
R2‑1911409 | Event based logging for coverage hole detection | LG Electronics Inc. | imported from 3GU |
R2‑1911410 | Discussion on Performing CHO instead of RRE in CHO | Samsung Electronics Polska, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | imported from 3GU |
R2‑1911411 | Sidelink HARQ retransmission in mode 1 | ITL | imported from 3GU |
R2‑1911412 | Draft CR on multiplexing of data | Huawei, HiSilicon | imported from 3GU |
R2‑1911413 | Draft CR for number of active CG/SPS configurations | Huawei, HiSilicon | imported from 3GU |
R2‑1911414 | First option of change for determination of HARQ process ID for a CG/SPS occasion | Huawei, HiSilicon | imported from 3GU |
R2‑1911415 | Second option of change for determination of HARQ process ID for a CG/SPS occasion | Huawei, HiSilicon | imported from 3GU |
R2‑1911416 | Discussion on the provision of TSC related assistant information | Huawei, HiSilicon | imported from 3GU |
R2‑1911417 | Draft CR on EHC header format | Huawei, HiSilicon | imported from 3GU |
R2‑1911418 | Draft LS to SA2 on TSC AI | Huawei, HiSilicon | imported from 3GU |
R2‑1911419 | Further iscussion on intra frequency reselection for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911420 | Remaining issue on NR SL QoS and SLRB configurations | ITL | imported from 3GU |
R2‑1911421 | Source RLM handling for eMBB HO | SHARP Corporation | imported from 3GU |
R2‑1911422 | Discussion on Interruption Requirements in CHO | Samsung Electronics Polska | imported from 3GU |
R2‑1911423 | Consideration on Default SLRB | ITL | imported from 3GU |
R2‑1911424 | Considerations on satellite location sharing | ETRI | imported from 3GU |
R2‑1911425 | LS on Interruption Timer in Conditional Handover | Samsung Electronics Polska | imported from 3GU |
R2‑1911426 | Discussion on Multiple Triggering Condition for CHO Execution | Samsung Electronics Polska | imported from 3GU |
R2‑1911427 | Discussion on LCH-to-Cell restriction for PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1911428 | On BAP Configuration for IAB | CATT | imported from 3GU |
R2‑1911429 | On Routing for IAB | CATT | imported from 3GU |
R2‑1911430 | Lossless Transmission in BH Path Switching | CATT | imported from 3GU |
R2‑1911431 | Summary of the Email Discussion [106#43][IAB] Backhaul RLF | CATT | imported from 3GU |
R2‑1911432 | Discussion on remaining issues on sidelink configured grant | LG Electronics | imported from 3GU |
R2‑1911433 | Discussion on assistance information for resource allocation in NR SL | LG Electronics | imported from 3GU |
R2‑1911434 | Discussion on measurement and report in NR SL | LG Electronics | imported from 3GU |
R2‑1911435 | Discussion on SL-RSRP report to gNB in NR SL | LG Electronics | imported from 3GU |
R2‑1911436 | Discussion on withdrawing of sidelink configured resource in NR SL | LG Electronics | imported from 3GU |
R2‑1911437 | Discussion on HARQ enable and disable in NR SL | LG Electronics | imported from 3GU |
R2‑1911438 | Enhancements for low-latency IAB Uplink scheduling | Futurewei Technologies | imported from 3GU |
R2‑1911439 | Considerations for NR E-CID | Samsung R&D Institute UK | imported from 3GU |
R2‑1911440 | Consideration of beam for NR OTDOA | Samsung R&D Institute UK | imported from 3GU |
R2‑1911441 | On the supporting option d' in IAB NR-DC | Samsung R&D Institute UK | imported from 3GU |
R2‑1911442 | ENDC support in IAB | Samsung R&D Institute UK | imported from 3GU |
R2‑1911443 | RLF reporting in dual connection | Samsung R&D Institute UK | imported from 3GU |
R2‑1911444 | Consideration of multiple candidate target cell for NR CHO | Samsung R&D Institute UK | imported from 3GU |
R2‑1911445 | Introduction of T312 in NR | Samsung R&D Institute UK, Qualcomm Incorporated | imported from 3GU |
R2‑1911446 | Further enhancement of T312 in NR | Samsung R&D Institute UK | imported from 3GU |
R2‑1911447 | Introduction of channel occupancy and RSSI into conditional handover for NR-U | Samsung R&D Institute UK | imported from 3GU |
R2‑1911448 | Introducing T312 for Pcell in NR | Samsung R&D Institute UK | imported from 3GU |
R2‑1911449 | Applying T312 on serving frequency in NR | Samsung R&D Institute UK | imported from 3GU |
R2‑1911450 | On the supporting of relaxed measurement state for UE power saving | Samsung R&D Institute UK | imported from 3GU |
R2‑1911451 | On supporting the short periodicity of SSB measurement for IDLE/Inactive UE | Samsung R&D Institute UK | imported from 3GU |
R2‑1911452 | IAB ENDC SRB usage | Samsung R&D Institute UK | imported from 3GU |
R2‑1911453 | IAB data traffic in IAB ENDC case | Samsung R&D Institute UK | imported from 3GU |
R2‑1911454 | Consideration of multiple candidate target cell for LTE CHO | Samsung R&D Institute UK | imported from 3GU |
R2‑1911455 | Remaining Issues of Fast MCG Link Recovery | Samsung | imported from 3GU |
R2‑1911456 | Reordering Problem at MCG Link Recovery | Samsung | imported from 3GU |
R2‑1911457 | Discussion on FailureInformation | Samsung | imported from 3GU |
R2‑1911458 | Configuration and Initial State of PDCP Duplication | Samsung | imported from 3GU |
R2‑1911459 | Leftover Issues on Accurate Timing Delivery | Samsung | imported from 3GU |
R2‑1911460 | Discussion on Multiple Active CG/SPS Configurations | Samsung | imported from 3GU |
R2‑1911461 | Prioritization of Data in MAC PDU | Samsung | imported from 3GU |
R2‑1911462 | Split Bearer Fallback at Deactivation of PDCP Duplication | Samsung | imported from 3GU |
R2‑1911463 | Prioritization of SR Transmission for URLLC | Samsung | imported from 3GU |
R2‑1911464 | Selective Duplication by Header-Only Packet | Samsung | imported from 3GU |
R2‑1911465 | Discussion on UE Autonomous PDCP Duplication | Samsung | imported from 3GU |
R2‑1911466 | Parameter Reconfiguration at SLRB Reconfiguration | Samsung | imported from 3GU |
R2‑1911467 | Discussion on UE location information in SCG failure report | NTT DOCOMO INC. | imported from 3GU |
R2‑1911468 | Correction to ROHC handling | Google Inc. | imported from 3GU |
R2‑1911469 | Correction on cell selection after RNA update | Google Inc. | imported from 3GU |
R2‑1911470 | Need for Primary path in PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1911471 | Introduction of RRC parameters and UE capabilities for enhanced high speed scenario | NTT DOCOMO INC. | imported from 3GU |
R2‑1911472 | Report for email discussion [106#53][IIOT] overlapping PUSCH grant prioritization (DCM) | NTT DOCOMO INC. | imported from 3GU |
R2‑1911473 | Bounded Time for MCG fast recovery | LG Electronics France | imported from 3GU |
R2‑1911474 | Control plane during eMBB mobility | LG Electronics France | imported from 3GU |
R2‑1911475 | DL packet delay due to inter-node forwarding | LG Electronics France | imported from 3GU |
R2‑1911476 | Control plane during eMBB mobility for NR | LG Electronics France | imported from 3GU |
R2‑1911477 | DL packet delay due to inter-node forwarding_NR | LG Electronics France | imported from 3GU |
R2‑1911478 | Minimal service interruption with mutiple BH RLF notification types | LG Electronics France | imported from 3GU |
R2‑1911479 | Transport of BH RLF notification | LG Electronics France | imported from 3GU |
R2‑1911480 | Access Control in IAB networks | LG Electronics France | imported from 3GU |
R2‑1911481 | CR on Correction to field description on pdcp-Duplication | LG Electronics France | imported from 3GU |
R2‑1911482 | Review of NPN requirements and potential work areas | LG Electronics France | imported from 3GU |
R2‑1911483 | Introduction of RLF report in NR SA | Samsung R&D Institute UK | imported from 3GU |
R2‑1911484 | Handover in EN-DC | Google Inc. | imported from 3GU |
R2‑1911485 | Capability filtering on CodebookParameters | NTT DOCOMO, INC. | imported from 3GU |
R2‑1911486 | 38.331 Draft CR on RRC segmentation for UE capability information | Huawei, HiSilicon | imported from 3GU |
R2‑1911487 | RLM in DAPS | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1911488 | Discussion on resource allocation | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1911489 | Discussion on unicast connection establishment | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1911490 | Discussion on sidelink admission control | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1911491 | Discussion on BSR prioritization | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1911492 | Motivation for Bearer Re-mapping at Intermediate IAB nodes | Futurewei Technologies | imported from 3GU |
R2‑1911493 | Discussion on DL RLF trigering for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911494 | Remaining Issues on de-prioritized PUSCH on Configured Grant | China Telecommunications | imported from 3GU |
R2‑1911495 | Remaining Issues on de-prioritized PUSCH on Configured Grant | China Telecommunications | imported from 3GU |
R2‑1911496 | Draft CR for PDCCH occasions for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911497 | LS on RAR format for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1911498 | Correction to fix 5G Icon from being erroneously displayed | AT&T, KT, NextNav, Polaris, Apple, Verizon | imported from 3GU |
R2‑1911499 | LS on Recommended Bit Rate/Query for FLUS and MTSI (S4-191031; contact: Qualcomm) | SA4 | imported from 3GU |
R2‑1911500 | Report of Email Discussion [106#40][NR/Mob enh] Beam specific aspects of CHO | Qualcomm Incorporated | imported from 3GU |
R2‑1911501 | Consideration on the load balance between 2-step RACH and 4-step RACH | ZTE Corporation, Sanechips, CATT | imported from 3GU |
R2‑1911502 | PARLOS RAN2 impacts | Qualcomm Incorporated | imported from 3GU |
R2‑1911503 | Introduction of RLOS support indicator and RLOS request indicator | Qualcomm Incorporated | imported from 3GU |
R2‑1911504 | Procedure and format for beam index indication MAC CE | Qualcomm Incorporated | imported from 3GU |
R2‑1911505 | Clarification on UE capability on different numerologies within the same PUCCH group | ZTE Corporation | imported from 3GU |
R2‑1911506 | Support of E-UTRA SCG maximum power configuration in NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911507 | Support for flow based QoS and slicing for NB-IoT and eMTC connected to 5GC | Ericsson | imported from 3GU |
R2‑1911508 | CR to 38.331 on support of corss-carrier scheduling with different numerology | Qualcomm Incorporated | imported from 3GU |
R2‑1911509 | Intra-E-UTRA inter-system handover | Intel Corporation, Sharp, MediaTek Inc. | imported from 3GU |
R2‑1911510 | Correction on contention resolution with CCCH SDU in msg3 | Huawei, HiSilicon | imported from 3GU |
R2‑1911511 | Report from sessions on NR idle/inactive mobility, NR SON/MDT, LTE TEI16 | Vice-Chair (CMCC) | imported from 3GU |
R2‑1911512 | Report from sessions on NR UP, IAB, NR-U, NR IIoT | Vice-Chair (MediaTek) | imported from 3GU |
R2‑1911513 | Report from session on NB-IoT | Session Chair (Huawei) | imported from 3GU |
R2‑1911514 | Report from session on MTC | Session Chair (Ericsson) | imported from 3GU |
R2‑1911515 | Report from session on Legacy LTE, Rel-15 LTE, NR NTN SI, NR power saving SI, NR 2 step RACH | Session Chair (InterDigital) | imported from 3GU |
R2‑1911516 | Report from session on Rel-15 LTE Positioning, Rel-15 and 16 NR Positioning | Session Chair (MediaTek) | imported from 3GU |
R2‑1911517 | Report from session on LTE V2X and NR V2X | Session Chair (Intel) | imported from 3GU |
R2‑1911518 | Report from session on Rel-16 LTE Mobility Enhancements WI | Session Chair (Nokia) | imported from 3GU |
R2‑1911519 | PDU session release indication to upper layers during Full Configuration | Intel Corporation, Ericsson | imported from 3GU |
R2‑1911520 | Reply LS on UAC for NB-IoT (S1-192707; contact: Qualcomm) | SA1 | imported from 3GU |
R2‑1911521 | Reply LS on UAC for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1911522 | Discussion on the WUS linked to C-DRX Ondurations | Xiaomi Communications | imported from 3GU |
R2‑1911523 | Corrections on the condition of RBTermChange | Huawei, HiSilicon | imported from 3GU |
R2‑1911524 | [Draft] Reply to LS on Impersonation Attacks in 4G Networks | Intel Corporation | imported from 3GU |
R2‑1911525 | LS to SA5 on alignment between SA5 and RAN2 on L2 measurements | Ericsson | imported from 3GU |
R2‑1911526 | [DRAFT] LS on the feasibility of Received Interference Power measurement | Huawei | imported from 3GU |
R2‑1911527 | [Results of Offline#203] | Ericsson | imported from 3GU |
R2‑1911528 | Miscellaneous Corrections (Rapporteur) | Qualcomm Incorporated | imported from 3GU |
R2‑1911529 | Introduction of RRC parameters and UE capabilities for enhanced high speed scenario | NTT DOCOMO INC. | imported from 3GU |
R2‑1911530 | Miscellaneous editorial corrections | Samsung | imported from 3GU |
R2‑1911531 | [DRAFT] LS on CP bearer mapping for IAB | LG Electronics Inc. | imported from 3GU |
R2‑1911532 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911533 | LS on System Impacts of NR-U | RAN2 | imported from 3GU |
R2‑1911534 | [DRAFT] LS to RAN3 on flow control in IAB | Samsung | imported from 3GU |
R2‑1911535 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911536 | Summary of the discussion on CSI-RS resource ID for SP SRS activation | vivo | imported from 3GU |
R2‑1911537 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911538 | LS on CP bearer mapping for IAB | RAN2 | imported from 3GU |
R2‑1911539 | LS to RAN3 on flow control in IAB | RAN2 | imported from 3GU |
R2‑1911540 | LS on additional PDCCH monitoring occasions for paging for NR-U | ZTE Corporation | imported from 3GU |
R2‑1911541 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.306) | Huawei, HiSilicon | imported from 3GU |
R2‑1911542 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.331) | Huawei, HiSilicon | imported from 3GU |
R2‑1911543 | Clarification on selectedBandCombinationNR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911544 | Clarification on selectedBandCombinationNR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911545 | Stage-2 running CR for support of NR Industrial IoT WI | Nokia (Rapporteur) | imported from 3GU |
R2‑1911546 | NR_IAB running CR for 38300 | Qualcomm Inc (Rapporteur) | imported from 3GU |
R2‑1911547 | Independent migration to IPv6 on S1-U for en-gNB’s | R3 (Ericsson) | imported from 3GU |
R2‑1911548 | Location Reporting: effective PSCell ID reporting | R3 (Vodafone) | imported from 3GU |
R2‑1911549 | Correction of E-RAB Modification Indication | R3 (Nokia, Nokia Shanghai Bell) | imported from 3GU |
R2‑1911550 | TS37.340 Rapporteur Cleanups | R3 (ZTE) | imported from 3GU |
R2‑1911551 | [DRAFT] LS on AS key derivation for conditional handover | Sharp | imported from 3GU |
R2‑1911552 | NR_IAB running CR for 38300 | Qualcomm Inc (Rapporteur) | imported from 3GU |
R2‑1911553 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911554 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911555 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911556 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911557 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911558 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911559 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911560 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911561 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911562 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911563 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911564 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911565 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911566 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911567 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911568 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911569 | (reserved) | Johan's tdocs | imported from 3GU |
R2‑1911570 | Correction to the description of DL channel quality | Huawei, HiSilicon | imported from 3GU |
R2‑1911571 | Correction to the description of DL channel quality | Huawei, HiSilicon | imported from 3GU |
R2‑1911572 | Introduction of DL channel quality reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1911573 | Introduction of DL channel quality reporting | Huawei, HiSilicon | imported from 3GU |
R2‑1911574 | Correction on the field description of nprach-SubCarrierIndex | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1911575 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911576 | [DRAFT] LS to RAN6 on IRAT Cell Selection Assistance information | Nokia | imported from 3GU |
R2‑1911577 | Reply LS on UAC for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1911578 | Summary of Offline#300 | NTT DOCOMO Inc. | imported from 3GU |
R2‑1911579 | Clarification for the paging and PRACH carrier selection-option 1 | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1911580 | [Draft] Reply LS on assistance indication for WUS | Huawei | imported from 3GU |
R2‑1911581 | Summary of Offline discussion #306 | Qualcomm Incorporated | imported from 3GU |
R2‑1911582 | [DRAFT] Reply LS on channel quality report in connected mode for NB-IoT | Huawei | imported from 3GU |
R2‑1911583 | LS to RAN6 on IRAT Cell Selection Assistance information | RAN2 | imported from 3GU |
R2‑1911584 | [DRAFT] LS on MME Being Unaware of WUS in Rel-15 | NTT DOCOMO, INC | imported from 3GU |
R2‑1911585 | Clarification for the paging and PRACH carrier selection-option 1 | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1911586 | [Draft] Reply LS on assistance indication for WUS | Huawei | imported from 3GU |
R2‑1911587 | Reply LS on channel quality report in connected mode for NB-IoT | RAN2 | imported from 3GU |
R2‑1911588 | Reply LS on UAC for NB-IoT | RAN2 | imported from 3GU |
R2‑1911589 | Reply LS on assistance indication for WUS | RAN2 | imported from 3GU |
R2‑1911590 | Summary of Offline #310 | Ericsson | imported from 3GU |
R2‑1911591 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911592 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911593 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911594 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911595 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911596 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911597 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911598 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911599 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1911600 | [DRAFT] Reply LS on Mobile-terminated Early Data Transmission | Ericsson | imported from 3GU |
R2‑1911601 | Reply LS on LTE-M identification in 5GC | RAN2 | imported from 3GU |
R2‑1911602 | Summary of discussion on the use of LTE Control Channel Region for DL transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1911603 | Reply LS on Mobile-terminated Early Data Transmission | RAN2 | imported from 3GU |
R2‑1911604 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1911605 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1911606 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1911607 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1911608 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1911609 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1911610 | Correction on handling of SCell(s) during MBB HO - Option 2 | Qualcomm Incorporated | imported from 3GU |
R2‑1911611 | Correction to sTTI and sPT capability reporting | Google Inc. | imported from 3GU |
R2‑1911612 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911613 | Correction on EPS fallback for LTE-5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1911614 | Correction on the feature downlink SDAP header | Huawei, HiSilicon | imported from 3GU |
R2‑1911615 | Correction on stop condition of T380 | LG Electronics Inc. | imported from 3GU |
R2‑1911616 | Normative Annex of CRs Containing Early Implementable Features and Corrections | NTT DOCOMO INC. | imported from 3GU |
R2‑1911617 | Editorial/ minor corrections collected by Rapporteur | Samsung Telecommunications | imported from 3GU |
R2‑1911618 | UE behavior on WUS occasion in DRX Active Time | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1911619 | Summary of offline discussion on power saving | Qualcomm | imported from 3GU |
R2‑1911620 | Summary of offline related to measurement relaxation criteria | MediaTek Inc. | imported from 3GU |
R2‑1911621 | Text proposal on RLC and PDCP for NTN | Ericsson, Nomor Research GmbH, Thales | imported from 3GU |
R2‑1911622 | Analysis on handover interruption time for NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911623 | Service continuity for transparent LEO | Ericsson | imported from 3GU |
R2‑1911624 | (reserved) | Diana's tdocs | imported from 3GU |
R2‑1911625 | [DRAFT] LS to RAN1 on RAN2 agreements related to 2-step RACH | CATT | imported from 3GU |
R2‑1911626 | Corrections to SIB12 for CMAS geo-fencing | Nokia, Nokia Shanghai Bell, AT&T, Ericsson, Qualcomm Inc., Sprint, T-Mobile USA, Verizon Wireless | imported from 3GU |
R2‑1911627 | Corrections to SIB8 for CMAS geo-fencing | Nokia, Nokia Shanghai Bell, AT&T, Ericsson, Qualcomm Inc., Sprint, T-Mobile USA, Verizon Wireless | imported from 3GU |
R2‑1911628 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911629 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911630 | Offline discussion [#601][NR/Positioning] SSR grid definition | u-blox AG | imported from 3GU |
R2‑1911631 | Distinguishing Location Source when sensor method is used | Ericsson, Sony, NextNav | imported from 3GU |
R2‑1911632 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911633 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911634 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911635 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911636 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911637 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911638 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911639 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1911640 | Offline discussion report on 800 | Intel Corporation | imported from 3GU |
R2‑1911641 | Scope of email discussion for PDCP details on RUDI HO | MediaTek Inc. | imported from 3GU |
R2‑1911642 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911643 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911644 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911645 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911646 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911647 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911648 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911649 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1911650 | Security requirement for UE capability enquiry for NR | Intel Corporation, NTT DoCoMo, Ericsson, Apple | imported from 3GU |
R2‑1911651 | Security requirement for UE capability enquiry for LTE | Intel Corporation, NTT DoCoMo, Ericsson, Apple | imported from 3GU |
R2‑1911652 | [DRAFT] Reply LS on Handling of UE radio network capabilities in 4G and 5G | Intel Corporation | imported from 3GU |
R2‑1911653 | Correction on 5GC to EPC inter-RAT inter-system handover | SHARP Corporation, Nokia | imported from 3GU |
R2‑1911654 | Clarification of handover terminology | Ericsson, ZTE Corporation (Rapporteur), Huawei | imported from 3GU |
R2‑1911655 | Default DRB handling | ZTE Corporation, Ericsson | imported from 3GU |
R2‑1911656 | CR for PDCP configuration generation | Huawei, Hisilicon | imported from 3GU |
R2‑1911657 | LTE to NR-DC Inter-RAT HO support | Qualcomm Incorporated | imported from 3GU |
R2‑1911658 | Review outcome e-mail on early measurement configuration (36) | Samsung Telecommunications | imported from 3GU |
R2‑1911659 | Clarification about setting the SMTC in NSA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911660 | correction on Tx DC location | Huawei, Hisilicon | imported from 3GU |
R2‑1911661 | maxMIMO-Layers for the normal uplink and the supplementary uplink_Option 1 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911662 | Correction on TDD-UL-DL-Config | CATT | imported from 3GU |
R2‑1911663 | Correction of the secondHopPRB Parameter | CATT | imported from 3GU |
R2‑1911664 | Clarification for enabling of configured PUSCH frequency hopping | Spreadtrum Communications | imported from 3GU |
R2‑1911665 | Clarification on max payload of PUCCH-ResourceSet | vivo | imported from 3GU |
R2‑1911666 | Clarification on PUCCH and PUSCH configuration | vivo | imported from 3GU |
R2‑1911667 | Running CR to Introduce NR MDT for RAN Data Collection and Utilization | Nokia, Nokia Shanghai Bell (Rapporteur) | imported from 3GU |
R2‑1911668 | Clarification on definition of PUSCH-Less Scell | Huawei, HiSilicon | imported from 3GU |
R2‑1911669 | Corrections on the condition of RBTermChange | Huawei, HiSilicon | imported from 3GU |
R2‑1911670 | Reply LS on protection of PC5-RRC messages for sidelink unicast communication | Huawei [To be RAN2] | imported from 3GU |
R2‑1911671 | TP on LTE V2X for TR 37.985 - RAN2 parts | Huawei (Rapporteur) | imported from 3GU |
R2‑1911672 | [Running CR] Introduction of 5G V2X with NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1911673 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911674 | [Draft] LS on UL-SL prioritization | OPPO | imported from 3GU |
R2‑1911675 | Draft LS on NR V2X cross-RAT configuration | CATT | imported from 3GU |
R2‑1911676 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911677 | [DRAFT] LS on NR V2X Security for user plane data and PDCP SN size | vivo | imported from 3GU |
R2‑1911678 | [Running CR] Introduction of 5G V2X with NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1911679 | LS on UL-SL prioritization | RAN2 | imported from 3GU |
R2‑1911680 | LS to on NR V2X cross-RAT configuration | RAN2 | imported from 3GU |
R2‑1911681 | LS on NR V2X Security for user plane data and PDCP SN size | RAN2 | imported from 3GU |
R2‑1911682 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911683 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911684 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911685 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911686 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911687 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911688 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911689 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1911690 | Clarification on SRB2 and DRB configuration | Intel Corporation | imported from 3GU |
R2‑1911691 | Correction on inter-RAT cell re-selection when UE is in RRC_IDLE | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911692 | PDU session release indication to upper layers during Full Configuration | Intel Corporation, Ericsson | imported from 3GU |
R2‑1911693 | Correction on reestablishRLC | Ericsson | imported from 3GU |
R2‑1911694 | Corrections on SIB1 configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1911695 | Clarification to fullConfig in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911696 | Correction on usage of access category 2 for UAC for RNA update | MediaTek Inc. | imported from 3GU |
R2‑1911697 | [DRAFT] LS on misalignment in Counter Check Procedure | Samsung | imported from 3GU |
R2‑1911698 | Correction on UE actions upon going to RRC_IDLE | Huawei, HiSilicon | imported from 3GU |
R2‑1911699 | Miscellaneous non-controversial corrections Set III | Ericsson | imported from 3GU |
R2‑1911700 | Reply LS on SFTD measurement | RAN2 | imported from 3GU |
R2‑1911701 | Introduction of SFTD measurement to neighbour cells for NR SA | MediaTek Inc., ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911702 | Introduction of SFTD measurement to neighbour cells for NR SA | MediaTek Inc., ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911703 | Correction on SFTD measurement configuration | Ericsson | imported from 3GU |
R2‑1911704 | Completion of System Level Work for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1911705 | [DRAFT] LS on System Impacts of NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1911706 | Clarification of Layer 3 filtering for E-UTRA | CATT, ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911707 | Small Corrections for System Information | CATT | imported from 3GU |
R2‑1911708 | Corrections to 38331 on SI-schedulingInfo | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911709 | Correction on acquisition of MIB and SIB1 for re-establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1911710 | Correction on band selection in SIB1 | Huawei, HiSilicon | imported from 3GU |
R2‑1911711 | Correction on acquisition of cell selection parameters in SIB2 and SIB4 | Huawei, HiSilicon | imported from 3GU |
R2‑1911712 | Channel Bandwidth validation upon SIB1 acquisition | Ericsson, ZTE Corporation | imported from 3GU |
R2‑1911713 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1911714 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1911715 | AS-ConfigNR at handover with (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1911716 | Correction of field inclusion for inter-node message | Huawei, HiSilicon | imported from 3GU |
R2‑1911717 | SFTD measurement information in CG-ConfigInfo | Huawei, HiSilicon | imported from 3GU |
R2‑1911718 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1911719 | Additional capability signalling for 1024QAM support | Qualcomm Incorporated | imported from 3GU |
R2‑1911720 | CB 106 BAP configuration | Qualcomm Inc. (Rapporteur) | imported from 3GU |
R2‑1911721 | Corrections on RRC reconfiguration with the fullConfig | Huawei, HiSilicon | imported from 3GU |
R2‑1911722 | CR on correction of the condition HO-toEUTRAN | Huawei, Hisilicon | imported from 3GU |
R2‑1911723 | Clarification to fullConfig in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911724 | Clarification on mobility of UE configured with SN terminated DRB without SCG | NEC | imported from 3GU |
R2‑1911725 | Missing reportAddNeighMeas in ReportConfigInterRAT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911726 | Draft LS on SRS-RSRP resource information exchange between gNBs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911727 | Clarification on non-support of DL sharing capabilities (38.306) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911728 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911729 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911730 | [DRAFT] LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities | ZTE | imported from 3GU |
R2‑1911731 | Miscellaneous corrections | Intel Corporation | imported from 3GU |
R2‑1911732 | UE Capabilities covering across all serving cells | Ericsson, Qualcomm Incorporated | imported from 3GU |
R2‑1911733 | Summary of [106#42] [NR/LTE/mob enh] CHO configuration | OPPO | imported from 3GU |
R2‑1911734 | Capability report and coordination in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911735 | PRACH Prioritization for MPS and MCS | Perspecta Labs, ECD, FirstNet, AT&T, Sprint, T-Mobile | imported from 3GU |
R2‑1911736 | UE capability coordination result exchange during handover for NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911737 | Correction of field descriptions in UE-CapabilityRequestFilterCommon (38.331) | Ericsson | imported from 3GU |
R2‑1911738 | Correction to s-Measure for NE-DC (36.331) | Ericsson | imported from 3GU |
R2‑1911739 | Handling of embedded RRC message in RRCReconfiguration procedure | Ericsson | imported from 3GU |
R2‑1911740 | Support of LCID change for NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911741 | CR on correction of condition HO-toNR and HO-Conn | Huawei, HiSilicon | imported from 3GU |
R2‑1911742 | Miscellaneous Corrections on 36.331 for MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911743 | CR to introduce NR SS-SINR measurement capability in LTE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911744 | Draft CR to 38.331 for introducing Cross-Carrier scheduling with different numerologies | Huawei, HiSilicon | imported from 3GU |
R2‑1911745 | RAN2 aspects of multi-beam enhancements | Ericsson | imported from 3GU |
R2‑1911746 | [DRAFT] LS on single PDCCH-based multi-TRP operation | Samsung | imported from 3GU |
R2‑1911747 | [DRAFT] Reply LS on MAC CE design for Scell BFR | Samsung | imported from 3GU |
R2‑1911748 | Revision to Non-Terrestrial Networks reference scenarios parameters | THALES, HNS | imported from 3GU |
R2‑1911749 | Reply LS on RAN sharing and Emergency services with NPN | CMCC | imported from 3GU |
R2‑1911750 | Summary of Offline discussion #10 | Nokia | imported from 3GU |
R2‑1911751 | Correction to PHR in dual connectivity | Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1911752 | Summary of Offline discussion #04 - Clarification on selectedBandCombinationNR | Nokia | imported from 3GU |
R2‑1911753 | LS on impact on UTRAN of 5G SRVCC | RAN2 | imported from 3GU |
R2‑1911754 | Report of Offline discussion 026 | MediaTek Inc. | imported from 3GU |
R2‑1911755 | Correction on overheating indication | MediaTek Inc. | imported from 3GU |
R2‑1911756 | Correction on overheating indication and RLM report | MediaTek Inc. | imported from 3GU |
R2‑1911757 | [Results of Offline#56] | ZTE | imported from 3GU |
R2‑1911758 | CR to introduce NR SS-SINR measurement capability in LTE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911759 | Outcome of NTN off line discussion | Thales | imported from 3GU |
R2‑1911760 | Report of Offline discussion #039 | Ericsson | imported from 3GU |
R2‑1911761 | [DRAFT] LS on Conditional PSCell addition/change | NTT DOCOMO | imported from 3GU |
R2‑1911762 | Analysis on handover interruption time for NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1911763 | Running CR for 38.331 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1911764 | Running CR for 36.331 for CA&DC enh. | Ericsson | imported from 3GU |
R2‑1911765 | [Draft] LS on support of simultaneous mode-1 and mode-2 configuration | Huawei | imported from 3GU |
R2‑1911766 | Report of offline discussion 74 | Intel Corporation | imported from 3GU |
R2‑1911767 | Reply LS on PARLOS RAN impacts | RAN2 | imported from 3GU |
R2‑1911768 | TP on Random Access for UE with location information | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd, Ericsson | imported from 3GU |
R2‑1911769 | Report of offline discussion #103 and CB513 | Google Inc. | imported from 3GU |
R2‑1911770 | [DRAFT] LS on Handling of multiple PLMN-assigned capability IDs | MadiaTek | imported from 3GU |
R2‑1911771 | Introduction of UE capabilities for further performance enhancement for LTE in high speed scenario in Rel-16 | CMCC, Huawei, HiSilicon | imported from 3GU |
R2‑1911772 | Miscellaneous non-controversial corrections Set III | Ericsson, ZTE Corporation | imported from 3GU |
R2‑1911773 | Channel Bandwidth validation upon SIB1 acquisition | Ericsson, ZTE Corporation | imported from 3GU |
R2‑1911774 | Summary of offline discussion on overload control | CATT | imported from 3GU |
R2‑1911775 | Summary of offline discussion on CFRA RAN2 impacts/recommendations and other failure case handling | ZTE | imported from 3GU |
R2‑1911776 | LS to RAN1 on RAN2 agreements related to 2-step RACH | RAN2 | imported from 3GU |
R2‑1911777 | Miscellaneous corrections | Intel Corporation | imported from 3GU |
R2‑1911778 | (reserved) | Diana's tdocs | imported from 3GU |
R2‑1911779 | (reserved) | Diana's tdocs | imported from 3GU |
R2‑1911780 | (reserved) | Diana's tdocs | imported from 3GU |
R2‑1911781 | (reserved) | Diana's tdocs | imported from 3GU |
R2‑1911782 | Offline 105: Determine impact and work effort for IAB NSA option 2 | AT&T | imported from 3GU |
R2‑1911783 | [DRAFT] LS on second SMTC periodicity in idle mode | Orange | imported from 3GU |
R2‑1911784 | Further discussion of SSB configuration in NR early measurements | Qualcomm Incorporated | imported from 3GU |
R2‑1911785 | Reply LS on physical layer data rate of RAN-assisted codec adaptation | RAN2 | imported from 3GU |
R2‑1911786 | CR on capability of maxUplinkDutyCycle for inter-band EN-DC PC2 UE | CMCC | imported from 3GU |
R2‑1911787 | [DRAFT] LS on maximum value of MDBV (S2-1907955/R2-1908654) | Qualcomm Incorporated | imported from 3GU |
R2‑1911788 | Reply LS on QoS Handling for V2X Communication Over Uu | RAN2 | imported from 3GU |
R2‑1911789 | Correction for UE context retrieval | Huawei, HiSilicon | imported from 3GU |
R2‑1911790 | Reply LS on bulk authentication issue for IoT devices | RAN2 | imported from 3GU |
R2‑1911791 | Reply LS on radio resource management policy | RAN2 | imported from 3GU |
R2‑1911792 | Report of Offline Discussion #108 - Extended PO for Paging in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911793 | NAS handling error of nas-Container for security key derivation | Intel Corporation | imported from 3GU |
R2‑1911794 | draft reply LS on CSI-RS configuration transfer | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911795 | Reply LS on MAC CE design for Scell BFR | RAN2 | imported from 3GU |
R2‑1911796 | CB 106 BAP configuration | Qualcomm Inc. (Rapporteur) | imported from 3GU |
R2‑1911797 | Correction to semi-persistent CSI report in DRX | Qualcomm Inc, Nokia, Nokia Shanghai Bell, OPPO | imported from 3GU |
R2‑1911798 | Report of Offline discussion #071 | LGE | imported from 3GU |
R2‑1911799 | [DRAFT] LS on Fast MCG Link Recovery using SRB3 | InterDigital | imported from 3GU |
R2‑1911800 | Correction on CA parameters in NR-DC | Huawei | imported from 3GU |
R2‑1911801 | CR on clarification of aggregated bandwidth for overheating | Huawei, HiSilicon | imported from 3GU |
R2‑1911802 | Offline 109: Stopping condition for monitoring additional paging occasions in NR-U | ZTE (offline rapporteur) | imported from 3GU |
R2‑1911803 | Discussion on supporting Split SRB 3 for IAB CP in NSA deployments | Futurewei | imported from 3GU |
R2‑1911804 | Ambiguity of UE FDD&TDD FR1&FR2 capabilities | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911805 | NAS handling error of nas-Container for security key derivation | Intel | imported from 3GU |
R2‑1911806 | Report of offline discussion #45 on Handling lists other than AddMod | Intel | imported from 3GU |
R2‑1911807 | Handling lists other than AddMod | Intel | imported from 3GU |
R2‑1911808 | Report of offline #28 on Need codes for conditions in CommonConfig | Intel | imported from 3GU |
R2‑1911809 | Need codes for conditions in CommonConfig | Intel | imported from 3GU |
R2‑1911810 | Intra-E-UTRA inter-system handover | Intel Corporation, Sharp, MediaTek Inc. | imported from 3GU |
R2‑1911811 | Clarification on definition of PUSCH-Less Scell | Huawei, HiSilicon | imported from 3GU |
R2‑1911812 | Clarification on SRB2 and DRB configuration | Intel Corporation | imported from 3GU |
R2‑1911813 | Summary of offline discussion [RAN2#107 Offline-051]: Measurement gap pattern capability in MR-DC | Qualcomm | imported from 3GU |
R2‑1911814 | Measurement gap pattern capability in MR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1911815 | MR-DC measurement gap pattern capability | Qualcomm Incorporated | imported from 3GU |
R2‑1911816 | MR-DC measurement gap pattern capability | Qualcomm Incorporated | imported from 3GU |
R2‑1911817 | [DRAFT] LS on Conditional PSCell addition/change | NTT DOCOMO | imported from 3GU |
R2‑1911818 | NAS handling error of nas-Container for security key derivation | Intel | imported from 3GU |
R2‑1911819 | Reply to LS on Impersonation Attacks in 4G Networks | RAN2 | imported from 3GU |
R2‑1911820 | Clarification about setting the SMTC in NSA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911821 | Correction on acquisition of cell selection parameters in SIB2 and SIB4 | Huawei, HiSilicon | imported from 3GU |
R2‑1911822 | Correction on overheating indication | MediaTek Inc. | imported from 3GU |
R2‑1911823 | Correction on overheating indication and RLM report | MediaTek Inc. | imported from 3GU |
R2‑1911824 | AS-ConfigNR at handover with (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1911825 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911826 | UE Capabilities covering across all serving cells | Ericsson, Qualcomm Incorporated | imported from 3GU |
R2‑1911827 | Reply LS on RAN sharing and Emergency services with NPN | RAN2 | imported from 3GU |
R2‑1911828 | Reply LS on SFTD measurement | RAN2 | imported from 3GU |
R2‑1911829 | Correction to IMS capability | Google Inc. | imported from 3GU |
R2‑1911830 | Conclusion of the respond to SA2 LS on delay critical QoS flows | Huawei | imported from 3GU |
R2‑1911831 | Reply LS on protection of PC5-RRC messages for sidelink unicast communication | RAN2 | imported from 3GU |
R2‑1911832 | Clarification of handover terminology | Ericsson, ZTE Corporation (Rapporteur), Huawei | imported from 3GU |
R2‑1911833 | How to differentiate PSCell change and Initial Access in NSA over F1 interface | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911834 | Correction on reestablishRLC | Ericsson | imported from 3GU |
R2‑1911835 | Correction of presence conditions for common PSCell parameters | Huawei, HiSilicon | imported from 3GU |
R2‑1911836 | [DRAFT] Reply LS on Handling of UE radio network capabilities in 4G and 5G | Intel Corporation | imported from 3GU |
R2‑1911837 | LS on misalignment in Counter Check Procedure | RAN2 | imported from 3GU |
R2‑1911838 | [DRAFT] LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities | ZTE | imported from 3GU |
R2‑1911839 | Handling of embedded RRC message in RRCReconfiguration procedure | Ericsson | imported from 3GU |
R2‑1911840 | LS on second SMTC periodicity in idle mode | RAN2 | imported from 3GU |
R2‑1911841 | LS on alignment between SA5 and RAN2 on L2 measurements | RAN2 | imported from 3GU |
R2‑1911842 | Report of Offline discussion #072 | LGE | imported from 3GU |
R2‑1911843 | Need codes for conditions in CommonConfig | Intel | imported from 3GU |
R2‑1911844 | Correction to IMS capability | Google Inc. | imported from 3GU |
R2‑1911845 | LS on Conditional PSCell addition/change | RAN2 | imported from 3GU |
R2‑1911846 | LS on the feasibility of Received Interference Power measurement | RAN2 | imported from 3GU |
R2‑1911847 | LS on Fast MCG Link Recovery using SRB3 | RAN2 | imported from 3GU |
R2‑1911848 | LS on single PDCCH-based multi-TRP operation | RAN2 | imported from 3GU |
R2‑1911849 | draft reply LS on CSI-RS configuration transfer | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1911850 | Reply LS on Handling of UE radio network capabilities in 4G and 5G | RAN2 | imported from 3GU |
R2‑1911851 | How to differentiate PSCell change and Initial Access in NSA over F1 interface | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1911852 | Correction of field inclusion for inter-node message | Huawei, HiSilicon | imported from 3GU |
R2‑1911853 | Correction on CA parameters in NR-DC | Huawei | imported from 3GU |
R2‑1911854 | LS on Handling of multiple PLMN-assigned capability IDs | RAN2 | imported from 3GU |
R2‑1911855 | Reply LS on CSI-RS configuration transfer | RAN2 | imported from 3GU |
R2‑1911856 | Report from sessions on NR UP, IAB, NR-U, NR IIoT | Vice-Chair (MediaTek) | imported from 3GU |
R2‑1911857 | Corrections on SIB1 configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1911858 | LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities | RAN2 | imported from 3GU |
R2‑1911859 | Reply LS on LS on maximum value of MDBV | RAN2 | imported from 3GU |
R2‑1911860 | Miscellaneous Corrections (Rapporteur) | Qualcomm Incorporated | imported from 3GU |
R2‑1911861 | LS on additional PDCCH monitoring occasions for paging for NR-U | RAN2 | imported from 3GU |
R2‑1911862 | LS to RAN1 on RAN2 agreements related to 2-step RACH | RAN2 | imported from 3GU |
R2‑1911863 | Reply LS on protection of PC5-RRC messages for sidelink unicast communication | RAN2 | imported from 3GU |
R2‑1911864 | Reply LS on LS on maximum value of MDBV | RAN2 | imported from 3GU |
R2‑1911865 | Reply LS on UAC for NB-IoT | RAN2 | imported from 3GU |
R2‑1911866 | maxMIMO-Layers for the normal uplink and the supplementary uplink_Option 1 | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1911867 | Adding P-EUTRA for supporting power coordination in NE-DC | Ericsson | imported from 3GU |
R2‑1911868 | Miscellaneous non-controversial corrections Set III | Ericsson | imported from 3GU |
R2‑1911869 | Channel Bandwidth validation upon SIB1 acquisition | Ericsson, ZTE Corporation | imported from 3GU |
R2‑1911870 | AS-ConfigNR at handover with (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1911871 | Clarifying UE capability freqHoppingPUCCH-F0-2 and freqHoppingPUCCH-F1-3-4 | Nokia, Nokia Shanghai Belll, ZTE Corporation, Huawei, HiSilicon | imported from 3GU |
R2‑1911872 | UE Capabilities covering across all serving cells | Ericsson, Qualcomm Incorporated | imported from 3GU |
R2‑1911873 | Corrections on the condition of RBTermChange | Huawei, HiSilicon | imported from 3GU |
R2‑1911874 | Support of LCID change for (NG)EN-DC and NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1911875 | Correction on RRC connection release indication after handover | Google Inc. | imported from 3GU |
R2‑1911876 | Correction on RRC connection release indication after handover | Google Inc. | imported from 3GU |
R2‑1911877 | Clarification about PSCell change between different SN nodes | Nokia, Nokia Shanghai Bell, ZTE Corporation | imported from 3GU |
R2‑1911878 | Editorial/ minor corrections collected by Rapporteur | Samsung (Rapporteur) | imported from 3GU |
R2‑1911879 | CR to introduce NR SS-SINR measurement capability in LTE | ZTE Corporation, Sanechips | imported from 3GU |
page generated from database: 2024-04-22 07:58:53