3GPP TDocs (written contributions) at meeting
Meeting: R2-108 - 2019-11-18 to 2019-11-22, Reno, Nevada
meeting id: R2-108 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R2‑1914300 | Agenda for RAN2#108 | Chairman | imported from 3GU |
R2‑1914301 | RAN2#107bis Meeting Report | MCC | imported from 3GU |
R2‑1914302 | LS on channel quality report for LTE-MTC (R1-1911386; contact: Samsung) | RAN1 | imported from 3GU |
R2‑1914303 | LS on support of high peak data rate for Cat-M1 UEs in HD-FDD (R1-1911398; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1914304 | LS on PUR transmission for NB-IoT/eMTC (R1-1911399; contact: Futurewei) | RAN1 | imported from 3GU |
R2‑1914305 | LS on PDCCH-based Power Saving Signal/Channel carrying indication of UE wakeup before DRX ON (R1-1911475; contact: CATT) | RAN1 | imported from 3GU |
R2‑1914306 | LS on NR IAB case-1 timing (R1-1911548; contact: ZTE) | RAN1 | imported from 3GU |
R2‑1914307 | LS on UE higher layer signalling for cross-slot scheduling (R1-1911586; contact: MediaTek) | RAN1 | imported from 3GU |
R2‑1914308 | LS on simultaneous TCI state activation and spatial relation update across multiple CCs/BWPs by MAC-CE (R1-1911617; contact: LGE) | RAN1 | imported from 3GU |
R2‑1914309 | LS on SCell BFR (R1-1911619; contact: Apple) | RAN1 | imported from 3GU |
R2‑1914310 | LS on SRS for NR Positioning (R1-1911634; contact: Intel) | RAN1 | imported from 3GU |
R2‑1914311 | Reply to LS on differentiating between MSG2 and MSGB (R1-1911656; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1914312 | LS on UE power saving terminology and text proposal to 38.300 (R1-1911667; contact: CATT) | RAN1 | imported from 3GU |
R2‑1914313 | Reply LS on propagation delay compensation for reference time information delivery (R1-1911693; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1914314 | LS on signalling of sidelink RSRP and CSI between UEs (R1-1911698; contact: LGE) | RAN1 | imported from 3GU |
R2‑1914315 | Reply LS on SL RLM/RLF (R1-1911699; contact: InterDigital) | RAN1 | imported from 3GU |
R2‑1914316 | Reply LS on additional PDCCH monitoring occasions for paging for NR-U (R1-1911705; contact: ZTE) | RAN1 | imported from 3GU |
R2‑1914317 | LS on NR V2X synchronization procedures (R1-1911718; contact: CATT) | RAN1 | imported from 3GU |
R2‑1914318 | Reply LS on UL-SL prioritization (R1-1911720; contact: OPPO) | RAN1 | imported from 3GU |
R2‑1914319 | Reply to LS on RAN2 agreements related to 2-step RACH (R1-1911739; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1914320 | Reply LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities (R1-1911741; contact: ZTE) | RAN1 | imported from 3GU |
R2‑1914321 | LS on Rel-16 LTE and NR parameter lists (R1-1911745; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1914322 | LS on additional high layer information for sidelink physical layer operations (R1-1911746; contact: LGE) | RAN1 | imported from 3GU |
R2‑1914323 | LS on aspects of Mission Critical Services over 5MBS (S6-192003; contact: AT&T) | SA5 | imported from 3GU |
R2‑1914324 | LS Reply on maximum value of MDBV (C3-194330; contact: Nokia) | CT3 | imported from 3GU |
R2‑1914325 | LS on CLI measurement reporting range (R4-1911416; contact: LGE) | RAN4 | imported from 3GU |
R2‑1914326 | LS on NID structure and length (C4-194332; contact: Ericsson) | CT4 | imported from 3GU |
R2‑1914327 | LS on NR IAB case-1 timing (R1-1911548; contact: ZTE) | RAN1 | imported from 3GU |
R2‑1914328 | LS to SA3 on False Base Station Detection (R3-196256; contact: Huawei) | RAN3 | imported from 3GU |
R2‑1914329 | LS on PRACH configuration conflict detection (R3-196270; contact: CATT) | RAN3 | imported from 3GU |
R2‑1914330 | LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication (R3-196280; contact: Ericsson) | RAN3 | imported from 3GU |
R2‑1914331 | LS on IP assignment in IAB network (R3-196284; contact: Samsung) | RAN3 | imported from 3GU |
R2‑1914332 | Reply LS on CSI-RS configuration transfer (R3-196288; contact: China Telecom) | RAN3 | imported from 3GU |
R2‑1914333 | LS on CLI measurement reporting range (R4-1911416; contact: LGE) | RAN4 | imported from 3GU |
R2‑1914334 | Reply LS on definition for SFTD measurement (R4-1912704; contact: Apple) | RAN4 | imported from 3GU |
R2‑1914335 | Reply LS on SFTD measurement (R4-1912705; contact: Intel) | RAN4 | imported from 3GU |
R2‑1914336 | LS on NR Mobility Enhancements (R4-1912707; contact: Intel) | RAN4 | imported from 3GU |
R2‑1914337 | LS Response on the feasibility of time synchronization accuracy requirements and related testing (R4-1912743; contact: Nokia | RAN4 | imported from 3GU |
R2‑1914338 | Reply LS on second SMTC periodicity in idle mode (R4-1912744; contact: Orange) | RAN4 | imported from 3GU |
R2‑1914339 | LS on thresholds for serving cell RSRP change based TA validation in PUR (R4-1912782; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1914340 | LS on sidelink synchronization under multiple synchronization sources with different timing (R4-1912826; contact: Qualcomm) | RAN4 | imported from 3GU |
R2‑1914341 | LS reply on NR V2X cross-RAT configuration (R4-1912874; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1914342 | LS on sync raster for NR V2X (R4-1913063; contact: Vivo, CATT) | RAN4 | imported from 3GU |
R2‑1914343 | Reply LS on mapping between LTE V2X PPPP and NR V2X priority (S2-1909987; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1914344 | Reply LS on LS on the IAB-indication to core network (S2-1910281; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1914345 | LS on IAB terminology update (S2-1910349; contact: Nokia) | SA2 | imported from 3GU |
R2‑1914346 | Reply LS on assistance indication for WUS (S2-1910549; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1914347 | Reply LS on LTE-M identification in 5GC (S2-1910644; contact: Orange) | SA2 | imported from 3GU |
R2‑1914348 | Reply LS on LS on maximum value of MDBV (S2-1910663; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1914349 | LS Reply on Handling of multiple PLMN-assigned capability IDs (S2-1910680; contact: vivo) | SA2 | imported from 3GU |
R2‑1914350 | Reply LS on Sidelink HARQ Feedback for Groupcast (S2-1910771; contact: LGE) | SA2 | imported from 3GU |
R2‑1914351 | Reply LS on NID structure and length (S2-1910784; contact: Ericsson) | SA2 | imported from 3GU |
R2‑1914352 | LS on dependencies on AS design for mobility management aspects of NTN in 5GS (S2-1910786; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1914353 | LS on system level design assumptions for satellite in 5GS (S2-1910787; contact: Qualcomm) | SA2 | imported from 3GU |
R2‑1914354 | Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC (S2-1910789; contact: Huawei) | SA2 | imported from 3GU |
R2‑1914355 | Reply LS on clarifications on Private Networks (S2-1910803; contact: Ericsson) | SA2 | imported from 3GU |
R2‑1914356 | Reply LS on Mobile-terminated Early Data Transmission (S2-1910804; contact: OPPO) | SA2 | imported from 3GU |
R2‑1914357 | LS on PC5S and PC5 RRC unicast message protection (S3-193802; contact: Qualcomm) | SA3 | imported from 3GU |
R2‑1914358 | Reply on QoE Measurement Collection (S4-191234; contact: Ericsson) | SA4 | imported from 3GU |
R2‑1914359 | LS on energy efficiency (S5-196771; contact: Orange) | SA5 | imported from 3GU |
R2‑1914360 | [Reserved for LSin] | ETSI | imported from 3GU |
R2‑1914361 | Remaining issues of NR early measurements | Qualcomm Incorporated | imported from 3GU |
R2‑1914362 | CR to 38.331 on support of cross-carrier scheduling with different numerology | Qualcomm Incorporated | imported from 3GU |
R2‑1914363 | Remaining issues of dormancy behaviour | Qualcomm Incorporated | imported from 3GU |
R2‑1914364 | Further discussion on suspension of SCG | Qualcomm Incorporated | imported from 3GU |
R2‑1914365 | Remaining Issues on RACH procedure in NR-U | vivo | imported from 3GU |
R2‑1914366 | Issues on the Autonomous BWP Switching in NR-U | vivo | imported from 3GU |
R2‑1914367 | Remaining Issues of UL LBT Failure | vivo | imported from 3GU |
R2‑1914368 | LBT Impacts on 2-step RACH | vivo | imported from 3GU |
R2‑1914369 | CAPC Restriction to SRB Multiplexing Using Configured Grant | vivo | imported from 3GU |
R2‑1914370 | Further Consideration on RAR reception in NR-U | vivo | imported from 3GU |
R2‑1914371 | Support of Multiple Active SPS | vivo | imported from 3GU |
R2‑1914372 | Further Discussion on the Whitelist in NR-U | vivo | imported from 3GU |
R2‑1914373 | Differentiation Between Msg2 and MsgB by MsgB-RNTI | vivo | imported from 3GU |
R2‑1914374 | Discussion on the 2-step CFRA | vivo | imported from 3GU |
R2‑1914375 | Contention Resolution of 2-step RACH Triggered by Uplink Data Arrival Without Valid TA | vivo | imported from 3GU |
R2‑1914376 | Remaining Issues on MsgA Transmission and Fallback | vivo | imported from 3GU |
R2‑1914377 | Resource Selection for 2-step RACH | vivo | imported from 3GU |
R2‑1914378 | Discussion on the BFR-initiated 2-step RACH | vivo | imported from 3GU |
R2‑1914379 | UE capability of Rel-16 DCCA enhancement | Qualcomm Incorporated | imported from 3GU |
R2‑1914380 | Discussion on RAN2 impacts of async CA | Qualcomm Incorporated | imported from 3GU |
R2‑1914381 | Discussion on fast SCell activation based on Aperiodic TRS (A-TRS) | Qualcomm Incorporated | imported from 3GU |
R2‑1914382 | Remaining issues of Scell BFR | CATT | imported from 3GU |
R2‑1914383 | On Remaining Open Issues of IAB BH RLF | CATT | imported from 3GU |
R2‑1914384 | On Hop-by-Hop Flow control for IAB BH | CATT | imported from 3GU |
R2‑1914385 | On Remaining Open Issues of IAB Routing | CATT | imported from 3GU |
R2‑1914386 | Cell restriction for CA duplication | OPPO | imported from 3GU |
R2‑1914387 | cDRX enhancements for CA with FR2 Scells | OPPO | imported from 3GU |
R2‑1914388 | Remaining stage-2 open issues for 2-step RACH | OPPO | imported from 3GU |
R2‑1914389 | msgB MAC PDU format in 2-step RACH | OPPO | imported from 3GU |
R2‑1914390 | Remaining issues on 2-step RACH configuration without 4-step resources | OPPO | imported from 3GU |
R2‑1914391 | Contention resolution for 2-step RACH in C-RNTI MAC CE case | OPPO | imported from 3GU |
R2‑1914392 | Contention free 2-step RACH | OPPO | imported from 3GU |
R2‑1914393 | Text proposal on power saving impacts on TS 37.340 | OPPO | imported from 3GU |
R2‑1914394 | Remaining issues on PDCCH-based WUS | OPPO | imported from 3GU |
R2‑1914395 | Impacts of power saivng signalling on CSI reporting | OPPO | imported from 3GU |
R2‑1914396 | Remaining issues of UE assistance information | OPPO | imported from 3GU |
R2‑1914397 | RRM relaxation for power saving | OPPO | imported from 3GU |
R2‑1914398 | Text proposal for NR-U impacts on TS 37.340 | OPPO | imported from 3GU |
R2‑1914399 | LBT aware UL BWP selection for RACH in NR-U | OPPO | imported from 3GU |
R2‑1914400 | Remaining issues on consistent uplink LBT failure for NR-U | OPPO | imported from 3GU |
R2‑1914401 | 2-step RACH for NR-U | OPPO | imported from 3GU |
R2‑1914402 | DRX procedure enhancements due to LBT impacts | OPPO | imported from 3GU |
R2‑1914403 | Remaining issues on NR-U configured grant | OPPO | imported from 3GU |
R2‑1914404 | CAPC for CG when SRB is multiplexed | OPPO | imported from 3GU |
R2‑1914405 | Discussion RAN1 LS on supporting multiple frequency domain monitoring locations for a searchspace | OPPO | imported from 3GU |
R2‑1914406 | Stopping criteria for paging monitoring | OPPO | imported from 3GU |
R2‑1914407 | Discussion on SSB measurement configuration with UE mobility | China Unicom | imported from 3GU |
R2‑1914408 | Open Issues of Reference Timing Delivery | CATT | imported from 3GU |
R2‑1914409 | Remaining Issues of Multiple SPS/CG Configurations | CATT | imported from 3GU |
R2‑1914410 | Discussion on Ethernet Header Compression | CATT | imported from 3GU |
R2‑1914411 | Intra-UE prioritization framework considering RAN1/RAN2 agreements | CATT | imported from 3GU |
R2‑1914412 | Handling of dropped MAC PDUs | CATT | imported from 3GU |
R2‑1914413 | MAC PDU priority determination | CATT | imported from 3GU |
R2‑1914414 | Equal-priority handling | CATT | imported from 3GU |
R2‑1914415 | The prioritization between MAC CEs and UL data | CATT | imported from 3GU |
R2‑1914416 | Primary Path and Initial State for PDCP Duplication | CATT | imported from 3GU |
R2‑1914417 | Discussion on Duplication MAC CE | CATT | imported from 3GU |
R2‑1914418 | LCH-to-Cell Restriction in Rel-16 | CATT | imported from 3GU |
R2‑1914419 | Discussion on UE based Duplication Activation/Deactivation | CATT | imported from 3GU |
R2‑1914420 | MAC upgrade for SR dropping in PHY | CATT, Qualcomm Inc. | imported from 3GU |
R2‑1914421 | On the remaining open issues of 2-step RACH | CATT | imported from 3GU |
R2‑1914422 | Load Balancing between RACH Types | CATT | imported from 3GU |
R2‑1914423 | Consideration on msgB-RNTI | CATT | imported from 3GU |
R2‑1914424 | RA Type Selection between CFRA and 2-step CBRA | CATT | imported from 3GU |
R2‑1914425 | Remaining issues on early measurement | CATT | imported from 3GU |
R2‑1914426 | Remaining Issues for Extending RAR Window | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914427 | CAPC Aspects for Scheduling SRB in Configured Grant | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914428 | Signaling Multiple UL grants for Msg3 Transmission in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914429 | Draft RRC CR_Supporting RAR Window Size larger than 10ms in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914430 | Report of Email discussion 107bis#76- MSG B Format Design | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914431 | MAC TP_MSGB Format Design | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914432 | Legacy CFRA and Selection between 2 step and 4 step RA | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914433 | 2 Step RACH_RNTI for Receiving Network Response | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914434 | 2 Step RA_RACH Configuration | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914435 | Open issues for supporting 2 step CFRA | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914436 | Impact of Mode 1 Resource Allocation on Uu BWP Operation | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914437 | RRC Connection Initiation Trigger for V2X Sidelink Communication | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914438 | RAN2 Aspects of SCell BFR | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1914439 | Discussion on idle procedure of NPN | CATT | imported from 3GU |
R2‑1914440 | Discussion on Connected mode aspects for NPN | CATT | imported from 3GU |
R2‑1914441 | RLM / RLF procedure in NR V2X Sidelink | CATT | imported from 3GU |
R2‑1914442 | Resource (Re-) selection function in NR V2X Sidelink | CATT | imported from 3GU |
R2‑1914443 | Remaining Issues on SL HARQ | CATT | imported from 3GU |
R2‑1914444 | Remaining Issues on PDCP | CATT | imported from 3GU |
R2‑1914445 | Resource allocation mode configuration | CATT | imported from 3GU |
R2‑1914446 | Leftover Issues on LCP | CATT | imported from 3GU |
R2‑1914447 | Leftover Issues for Sidelink Configured Grant | CATT | imported from 3GU |
R2‑1914448 | Remaining Issues for Prioritization between NR UL and NR SL | CATT | imported from 3GU |
R2‑1914449 | UE Behavior Clarification during UE States Transition | CATT | imported from 3GU |
R2‑1914450 | Open Issues for the Bi-directional SLRB | CATT | imported from 3GU |
R2‑1914451 | Discussion on inter-RAT Cell Selection/Reselection | CATT | imported from 3GU |
R2‑1914452 | Left Issues of SL BSR/SR | CATT | imported from 3GU |
R2‑1914453 | Congestion control for NR SL | CATT | imported from 3GU |
R2‑1914454 | Type 1 Sidelink Configured Grant Validity Time | CATT | imported from 3GU |
R2‑1914455 | Re-consideration on PLMN-wide Filter | CATT | imported from 3GU |
R2‑1914456 | Draft LS on PLMN-wide Filter | CATT | imported from 3GU |
R2‑1914457 | Proposal about the configurations of validity area for early measurement | China Unicom | imported from 3GU |
R2‑1914458 | Discussion for early measurement configuration for 2-step resume | China Unicom | imported from 3GU |
R2‑1914459 | Discussion on SL capability signaling for Uu-RRC and PC5-RRC | OPPO | imported from 3GU |
R2‑1914460 | Discussion on SL-related Uu-RRC messages | OPPO | imported from 3GU |
R2‑1914461 | Left issues on HARQ for NR-V2X | OPPO | imported from 3GU |
R2‑1914462 | Left issues on CSI report for NR-V2X | OPPO | imported from 3GU |
R2‑1914463 | Left issues on UL-SL prioritization for NR-V2X | OPPO | imported from 3GU |
R2‑1914464 | Left issues on PC5-S impact on AS-layer | OPPO | imported from 3GU |
R2‑1914465 | SL RSRP measurement report via PC5-RRC | OPPO | imported from 3GU |
R2‑1914466 | Left issues on failure case handling for NR V2X | OPPO | imported from 3GU |
R2‑1914467 | Left issues on SLRB configuration | OPPO | imported from 3GU |
R2‑1914468 | Signaling design for RAT-Dependent positioning methods | CATT | imported from 3GU |
R2‑1914469 | Broadcast Positioning Procedure in Connected Mode | CATT | imported from 3GU |
R2‑1914470 | Open Issues of Broadcast Positioning Assistance data | CATT | imported from 3GU |
R2‑1914471 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | imported from 3GU |
R2‑1914472 | Discussion on WUS assistance indication LS from SA2 and Rel-15 WUS | NTT DOCOMO INC. | imported from 3GU |
R2‑1914473 | Draft Reply LS on assistance indication for WUS | NTT DOCOMO INC. | imported from 3GU |
R2‑1914474 | CE Mode Threshold Adjustments for non-BL and BL UE | NTT DOCOMO INC. | imported from 3GU |
R2‑1914475 | Report of email discussion [107bis#88][NB-IoT R15] | NTT DOCOMO INC. | imported from 3GU |
R2‑1914476 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914477 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914478 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914479 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914480 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914481 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914482 | Clarification of PDCCH monitoring when not fully aligned with PDCCH periods | NTT DOCOMO INC. | imported from 3GU |
R2‑1914483 | Further Considerations on Capability Coordination for DAPS | CATT | imported from 3GU |
R2‑1914484 | UDC Impacts of DAPS | CATT | imported from 3GU |
R2‑1914485 | Remaining CP Issues of DAPS | CATT | imported from 3GU |
R2‑1914486 | Consideration on WA or MCG Fast Recovery Upon RLF | CATT | imported from 3GU |
R2‑1914487 | Further Discussions on Cell Evaluation for CHO Cell Selection | CATT | imported from 3GU |
R2‑1914488 | Coexistence of Simultaneous Connectivity and CHO | CATT | imported from 3GU |
R2‑1914489 | Remaining Issues of CHO Configuration | CATT | imported from 3GU |
R2‑1914490 | Considerations on IAB multi connectivity | KDDI Corporation | imported from 3GU |
R2‑1914491 | Discussion on a configuration mismatch between a UE and a target gNB | KDDI Corporation | imported from 3GU |
R2‑1914492 | Discussion on reselection between NPNs and public networks | KDDI Corporation | imported from 3GU |
R2‑1914493 | Open Issues on NPN for UE in Inactive | CATT | imported from 3GU |
R2‑1914494 | Feeder link switch | CATT | imported from 3GU |
R2‑1914495 | Measurement Initiation Issue for NTN System | CATT | imported from 3GU |
R2‑1914496 | Discussion on Location Report | CATT | imported from 3GU |
R2‑1914497 | Consideration on the SPS/CG for NTN | CATT | imported from 3GU |
R2‑1914498 | TP on Random Access procedure | CATT | imported from 3GU |
R2‑1914499 | Leftover Issues for RACH Report Optimization | CATT | imported from 3GU |
R2‑1914500 | Configuration of Out-of-coverage Logging | CATT | imported from 3GU |
R2‑1914501 | Recording and Reporting of CEF | CATT | imported from 3GU |
R2‑1914502 | Failure Indication about SCG | CATT | imported from 3GU |
R2‑1914503 | Statistic of UL Delay Measurement in UE | CATT | imported from 3GU |
R2‑1914504 | Uncertainty of L2 Measurement Result Related to URLLC | CATT | imported from 3GU |
R2‑1914505 | Consideration on Successful HO Report | CATT | imported from 3GU |
R2‑1914506 | Supporting of Handover Type Indication in RLF Report | CATT | imported from 3GU |
R2‑1914507 | Report on Email Discussion 107b#85 NRMDT Mobility History | CATT | imported from 3GU |
R2‑1914508 | Discussion on PRACH coordination | CATT | imported from 3GU |
R2‑1914509 | Reply LS on PRACH configuration conflict detection | CATT | imported from 3GU |
R2‑1914510 | FDD and TDD Timing Alignment for Dual Connectivity | Vodafone | imported from 3GU |
R2‑1914511 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914512 | Stage 2 CR for Inter-RAT HO between NR to EN-DC in Rel-16 | China Telecommunications | imported from 3GU |
R2‑1914513 | Consecutive Conditional Handover | Apple Inc. | imported from 3GU |
R2‑1914514 | Remaining Issues for IAB Routing | Futurewei Technologies | imported from 3GU |
R2‑1914515 | PDCP SN continuity support for RLC UM bearers | Qualcomm Incorporated | imported from 3GU |
R2‑1914516 | Source connection handling during MBB HO | Qualcomm Incorporated | imported from 3GU |
R2‑1914517 | CHO SN addition/change handling | Qualcomm Incorporated | imported from 3GU |
R2‑1914518 | CHO SN addition/change failure handling | Qualcomm Incorporated | imported from 3GU |
R2‑1914519 | Support per DRB MBB HO configuration | Qualcomm Incorporated | imported from 3GU |
R2‑1914520 | Running Stage-2 CR for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1914521 | Running RRC CR for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1914522 | RAN2 work plan for UE Power Saving WI | CATT (rapporteur) | imported from 3GU |
R2‑1914523 | [107bis#69][PowerSaving] Running CR 38.300 (CATT) | CATT (rapporteur) | imported from 3GU |
R2‑1914524 | Remaining issues of PDCCH-WUS | CATT | imported from 3GU |
R2‑1914525 | RRC design for PDCCH-WUS | CATT | imported from 3GU |
R2‑1914526 | Remaining issues on UE assistance for power saving | CATT | imported from 3GU |
R2‑1914527 | Reusing overheating fields for SCell assistance information | CATT | imported from 3GU |
R2‑1914528 | Measurement Configuration in Inactive Mode and MR-DC | CATT | imported from 3GU |
R2‑1914529 | Considerations on cell reselection for early measurement reporting | CATT | imported from 3GU |
R2‑1914530 | Temporary RS utilization for SCell and SpCell | CATT | imported from 3GU |
R2‑1914531 | Considerations on suspend SCG configurations | CATT | imported from 3GU |
R2‑1914532 | Signalling enhancement for Inactive state | CATT | imported from 3GU |
R2‑1914533 | Bearer type negotiation | CATT | imported from 3GU |
R2‑1914534 | Corrections on CG-Config | CATT | imported from 3GU |
R2‑1914535 | Consideration on mode1 resource allocation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914536 | Discussion on UL and SL prioritisation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914537 | Discussion on SL CSI and RSRP report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914538 | Consideration on NR V2X CBR | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914539 | Left issues for MAC in NR V2X | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914540 | Discussion on left issue in NR V2X UP | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914541 | Discussion on NR V2X system information acquisition | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914542 | Discussion on remaining issues on SLRB parameters | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914543 | Consideration on sidelink RLM management | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914544 | Consideration on exceptional resource pool | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914545 | Consideration on NR V2X cross RAT support | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914546 | Discussion on SLRB maintenance during RRC state transition | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914547 | Further discussion on RLC AM and UM for NR V2X unicast | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914548 | Discussion on NR V2X groupcast feedback options | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914549 | Discussion the missing of UE coverage status description in TS38.304 and TS 36.304 | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914550 | Running Idle/Inactive CR for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1914551 | Fast Scell activation in sTAG | OPPO | imported from 3GU |
R2‑1914552 | Introduction of dormancy behavior in NR | OPPO | imported from 3GU |
R2‑1914553 | Open issues for early measurement | OPPO | imported from 3GU |
R2‑1914554 | Open issues for CLI measurment | OPPO | imported from 3GU |
R2‑1914555 | UE assistance information reporting for RRC_INACTIVE UE | OPPO | imported from 3GU |
R2‑1914556 | Security algorithom update in RRC reestablishment message | OPPO,Huawei | imported from 3GU |
R2‑1914557 | Correction on RRC Reestablishment procedure | OPPO | imported from 3GU |
R2‑1914558 | Correction Release cause for RRC signalling only connection | OPPO | imported from 3GU |
R2‑1914559 | Correction on split PDU session | OPPO | imported from 3GU |
R2‑1914560 | Discussion on Cached Data Handling for INACTIVE UE | OPPO | imported from 3GU |
R2‑1914561 | (running)36.304CR on cell selection(reselection) for NR V2X UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914562 | (running)38.304CR on cell selection(reselection) for NR V2X UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914563 | CR on NR V2X UE coverage status description in TS 36.304 | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914564 | CR on NR V2X UE coverage status description in TS 38.304 | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914565 | Discussion on PRS based positioning | ZTE Corporation | imported from 3GU |
R2‑1914566 | Modification to Multi-cell power control | ZTE Corporation | imported from 3GU |
R2‑1914567 | Discussion on ECID positioning in NR | ZTE Corporation | imported from 3GU |
R2‑1914568 | Draft LS on configuration exchange for CLI measurement | OPPO | imported from 3GU |
R2‑1914569 | Draft LS on early measurement configuration during 2 step resume procedure without UE context relocation | OPPO | imported from 3GU |
R2‑1914570 | Correction of cell reselection parameters for multi-beam operation | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1914571 | Correction on field description of cellReselectionInfoCommon | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1914572 | Handling of UL LBT failures | Intel Corporation | imported from 3GU |
R2‑1914573 | Channel Access Priority selection and multiplexing for Configure Grant | Intel Corporation | imported from 3GU |
R2‑1914574 | Multiple Active Configure Grant for NR-u | Intel Corporation | imported from 3GU |
R2‑1914575 | Practical scoping of SCell Dormancy operation in NR | Intel Corporation | imported from 3GU |
R2‑1914576 | Practical scoping of SCG suspension operation in NR | Intel Corporation | imported from 3GU |
R2‑1914577 | Miscellaneous corrections on UE capability fields | Intel Corporation | imported from 3GU |
R2‑1914578 | Clarification on the restriction of maximum SRS resource sets configuration for uplink beam management | Intel Corporation | imported from 3GU |
R2‑1914579 | Signaling Support for Frame Based Equipment for NR-u | Intel Corporation | imported from 3GU |
R2‑1914580 | Measurement gap capability information for Rel-16 UE | Intel Corporation | imported from 3GU |
R2‑1914581 | Work plan for Rel-16 UE Capability feature list | Intel Corporation | imported from 3GU |
R2‑1914582 | CAPC for RACH and PUCCH in NR-U | MediaTek Inc. | imported from 3GU |
R2‑1914583 | On Restrictions in Multiplexing of High and Low Priority LCH in CG | MediaTek Inc. | imported from 3GU |
R2‑1914584 | Including RSSI and Channel Occupancy in NR-U UE Capabilities | MediaTek Inc. | imported from 3GU |
R2‑1914585 | Conditional HO with L2 packet duplication in NR NTN | MediaTek Inc. | imported from 3GU |
R2‑1914586 | Improving Cell Reselection using Next Cell Information in LEO-NTN | MediaTek Inc. | imported from 3GU |
R2‑1914587 | Configuring Threshold-based Soft Handover in LEO NTN | MediaTek Inc. | imported from 3GU |
R2‑1914588 | Synchronized Handover without Random Access in LEO NTN | MediaTek Inc. | imported from 3GU |
R2‑1914589 | On Increasing Number of HARQ Processes in NTN | MediaTek Inc. | imported from 3GU |
R2‑1914590 | UE CLI Measurements for Multiconnectivity | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914591 | Remaning Issues for UE-CLI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914592 | On Release of source cell in DAPS Handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914593 | Running CR for 36.304 for Rel-16 NB-IoT Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914594 | GWUS Configuration and Resource mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914595 | Remaining Issues for PUR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914596 | PUR for control plane solution | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914597 | RNA Configuration | Nokia (Rapporteur) | imported from 3GU |
R2‑1914598 | NPN Work Plan | Nokia, China Telecom (Rapporteurs) | imported from 3GU |
R2‑1914599 | NPN Stage 2 Draft CR | Nokia (Rapporteur) | imported from 3GU |
R2‑1914600 | LS on Emergency Services in SNPN | Nokia (Rapporteur) | imported from 3GU |
R2‑1914601 | Split Threshold for DC and NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914602 | QoS Flow Handling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914603 | MDBV Enforcement | Nokia, InterDigital, Nokia Shanghai Bell | imported from 3GU |
R2‑1914604 | Notification for Alternative QoS profiles | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914605 | LS on Notification for Alternative QoS profiles | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914606 | HARQ process ID for deprioritized configured grants | III | imported from 3GU |
R2‑1914607 | Support the change between normal PDCP entity and DAPS PDCP entity | Mediatek Inc., Huawei, HiSilicon | imported from 3GU |
R2‑1914608 | Draft CR for 38.323 to support the change between normal PDCP and DAPS PDCP | Mediatek Inc., Huawei, HiSilicon | imported from 3GU |
R2‑1914609 | Draft CR for 36.323 to support the change between normal PDCP and DAPS PDCP | Mediatek Inc., Huawei, HiSilicon | imported from 3GU |
R2‑1914610 | RLC UM handling during DAPS HO | Mediatek Inc. | imported from 3GU |
R2‑1914611 | RLC Impacts analysis with DAPS during HO | Mediatek Inc. | imported from 3GU |
R2‑1914612 | QoS Flow to DRB Remapping during DAPS HO | Mediatek Inc. | imported from 3GU |
R2‑1914613 | draft CR to 37.324 to support QoS flow remapping during DAPS HO | Mediatek Inc. | imported from 3GU |
R2‑1914614 | Correction on reestablishRLC | CATT | imported from 3GU |
R2‑1914615 | DRX ambiguous period enhancements for NTN | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1914616 | Discussion on SCell BFR procedure | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1914617 | Discussion on 2-step RACH for BFR | Asia Pacific Telecom co. Ltd | imported from 3GU |
R2‑1914618 | QoS in NR V2X | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R2‑1914619 | PDCP status reporting in target cell at DAPS handover | Ericsson | imported from 3GU |
R2‑1914620 | RLC retransmissions to source during DAPS HO | Ericsson | imported from 3GU |
R2‑1914621 | Specification impact from RLC-UM DAPS support | Ericsson | imported from 3GU |
R2‑1914622 | Release of source cell at DAPS handover | Ericsson | imported from 3GU |
R2‑1914623 | Fallback to source cell during DAPS handover | Ericsson | imported from 3GU |
R2‑1914624 | On the configuration of DAPS handover per DRB | Ericsson | imported from 3GU |
R2‑1914625 | Capability coordination for DAPS handover | Ericsson | imported from 3GU |
R2‑1914626 | Cell Selection and Reselection aspects of NPN | Ericsson | imported from 3GU |
R2‑1914627 | Connected mode aspects of NPN | Ericsson | imported from 3GU |
R2‑1914628 | SIB1 design for NPN | Ericsson | imported from 3GU |
R2‑1914629 | On skipping supportedBandCombinations for band n90 | Ericsson | imported from 3GU |
R2‑1914630 | CR to 38.304 on dedicated cell reselection priorities | Ericsson | imported from 3GU |
R2‑1914631 | Dummify one of the cellReservedForOperatorUse-CRS-flags | Ericsson | imported from 3GU |
R2‑1914632 | [107bis#66][NR/NTN] Running TP (Thales) | THALES | imported from 3GU |
R2‑1914633 | Inputs to TR 38.821 recommendations | THALES | imported from 3GU |
R2‑1914634 | Remaining open issues for CHO | Ericsson | imported from 3GU |
R2‑1914635 | Handling of a HO command while UE is monitoring CHO | Ericsson | imported from 3GU |
R2‑1914636 | Suspend/Release while monitoring CHO in NR | Ericsson | imported from 3GU |
R2‑1914637 | Conditional PSCell addition/change | Ericsson | imported from 3GU |
R2‑1914638 | TP for 38.331 on CHO | Ericsson | imported from 3GU |
R2‑1914639 | Further details on CHO failure handling | Ericsson | imported from 3GU |
R2‑1914640 | Running CR for Introduction of Even futher Mobility enhancement in E-UTRAN | Ericsson | imported from 3GU |
R2‑1914641 | Discussion on incoming LSes for QoE measurement collection in LTE | Ericsson | imported from 3GU |
R2‑1914642 | Additions to QoE measurement collection | Ericsson | imported from 3GU |
R2‑1914643 | Draft reply LS on QoE Measurement Collection | Ericsson | imported from 3GU |
R2‑1914644 | UE capabilities for SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1914645 | Introduction of SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1914646 | Running CR for introduction of SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1914647 | Remaining issues on Paging | Ericsson | imported from 3GU |
R2‑1914648 | RRM in NR-U | Ericsson | imported from 3GU |
R2‑1914649 | Correction on T322 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914650 | Correction on T322 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914651 | On combined RRC procedures | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1914652 | RRC processing delays for combined procedures | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1914653 | Remaining issues of SL Prioritization | MediaTek Inc. | imported from 3GU |
R2‑1914654 | Remaining issues of SL LCP | MediaTek Inc. | imported from 3GU |
R2‑1914655 | On SL configured grant | MediaTek Inc. | imported from 3GU |
R2‑1914656 | Support of simultaneous mode 1 and mode 2 | MediaTek Inc. | imported from 3GU |
R2‑1914657 | RRM Measurements for Mobility in NR-U | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1914658 | Implicit Indication of LBT Failures in RRM Measurements | Fraunhofer HHI | imported from 3GU |
R2‑1914659 | Multiple Frequency Domain Monitoring Occasions | Fraunhofer HHI | imported from 3GU |
R2‑1914660 | Introduction of a second SMTC per frequency carrier in idle/inactive | Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, NTT Docomo Inc., Samsung, Ericsson | imported from 3GU |
R2‑1914661 | Introduction of a second SMTC for inter-RAT cell reselection | Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, NTT Docomo Inc., Samsung, Ericsson | imported from 3GU |
R2‑1914662 | Correction on frequency indication in SIB1 and SIB2 | Huawei, HiSilicon, Ericsson, MediaTek | imported from 3GU |
R2‑1914663 | Correction on parameter description of beamManagementSSB-CSI-RS in 38.306 | Huawei, HiSilicon | imported from 3GU |
R2‑1914664 | Clarification on gap sharing configuration handling at handover and re-establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1914665 | CR to 38.306 on DRX-based intra-frequency SFTD measurement | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1914666 | CR to 38.331 on DRX-based intra-frequency SFTD measurement | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1914667 | CR to 38.331 on CGI information | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1914668 | Report of [107bis#50][NR TEI16] Adding CSI-RS information into inter-node msg | Huawei, HiSilicon | imported from 3GU |
R2‑1914669 | CR to 38.331 on CSI-RS inter-node message | Huawei, HiSilicon | imported from 3GU |
R2‑1914670 | Reply LS on CSI-RS configuration transfer | Huawei, HiSilicon | imported from 3GU |
R2‑1914671 | Support of releasing UL configuration | Huawei, HiSilicon, CMCC, China Telecom, MediaTek Inc., Vodafone, Orange, vivo, OPPO, Spreadtrum Communications, China Unicom | imported from 3GU |
R2‑1914672 | DRX configuration coordination in (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1914673 | On the support of NG-based (i.e. via CN) handover based using CGI report | Huawei, HiSilicon | imported from 3GU |
R2‑1914674 | MAC CE signaling enhancement for TCI indication of single-PDCCH based multi-TRP transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1914675 | RRC signalling for MIMO enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1914676 | MAC CE signaling for multi-beam enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1914677 | NR-DC power control | Huawei, HiSilicon | imported from 3GU |
R2‑1914678 | Idle/inactive NR measurements in LTE and in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1914679 | MAC impact to support the efficient and low latency SCell configuration and activation | Huawei, HiSilicon | imported from 3GU |
R2‑1914680 | CG fast recovery via alternative UL | Huawei, HiSilicon | imported from 3GU |
R2‑1914681 | Remaining issues on fast MCG link recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1914682 | RAN2 impact to support cross-carrier scheduling with different numerologies | Huawei, HiSilicon | imported from 3GU |
R2‑1914683 | Clarification on RAN2 impact to support DL HARQ timing for dual UL EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1914684 | UE capabilities for DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1914685 | Correction on PUCCH transform precoding | vivo, Nokia (rapporteur) | imported from 3GU |
R2‑1914686 | Cell re-selection during RRC connection resume | vivo | imported from 3GU |
R2‑1914687 | Correction on beamSwitchTiming values of 224 and 336 | vivo, Huawei, Hisilicon | imported from 3GU |
R2‑1914688 | Introduction of NR IDC solution | vivo | imported from 3GU |
R2‑1914689 | 38.304 Running CR on UE Power saving in NR | vivo | imported from 3GU |
R2‑1914690 | Left issues and RRC parameters for PDCCH-WUS | vivo | imported from 3GU |
R2‑1914691 | WUS impact upon BWP switching | vivo | imported from 3GU |
R2‑1914692 | UE assistance information for power saving | vivo | imported from 3GU |
R2‑1914693 | Network controlled RRM measurement relaxation and criteria | vivo | imported from 3GU |
R2‑1914694 | UE Power Consumption Reduction in RRM Measurement | vivo | imported from 3GU |
R2‑1914695 | Running 36.321 CR for LTE feMob | vivo (rapporteur) | imported from 3GU |
R2‑1914696 | Running 38.321 CR for NR mobility enh. | vivo (rapporteur) | imported from 3GU |
R2‑1914697 | RRC remaining issues for conditional handover configuration | vivo | imported from 3GU |
R2‑1914698 | Discussion on CHO release | vivo | imported from 3GU |
R2‑1914699 | Discussion on the number of prepared cells for CHO | vivo | imported from 3GU |
R2‑1914700 | Discussion on the timer design for CHO | vivo | imported from 3GU |
R2‑1914701 | Discussion on simultaneous connectivity in CHO | vivo | imported from 3GU |
R2‑1914702 | Discussion on the DC configuration in conditional handover | vivo | imported from 3GU |
R2‑1914703 | Remaining issue of conditional PSCell addition and change | vivo | imported from 3GU |
R2‑1914704 | Failure handling of the non-DAPS DRB | vivo | imported from 3GU |
R2‑1914705 | Remaining PDCP issues of DAPS handover | vivo | imported from 3GU |
R2‑1914706 | SRB handling of DAPS failure | vivo | imported from 3GU |
R2‑1914707 | Clarification on the RLC handling of DAPS handover | vivo | imported from 3GU |
R2‑1914708 | Discussion on the signaling procedures of the DAPS HO | vivo | imported from 3GU |
R2‑1914709 | Discussion on the mTRP modelling | vivo | imported from 3GU |
R2‑1914710 | Email discussion summy on eMIMO MAC CE | vivo (rapporteur) | imported from 3GU |
R2‑1914711 | Discussion on eMIMO MAC CE | vivo | imported from 3GU |
R2‑1914712 | Remaining issue of SCell BFR | vivo | imported from 3GU |
R2‑1914713 | New MAC CE for indicating spatial resource for PUCCH resources | Ericsson | imported from 3GU |
R2‑1914714 | Miscellaneous corrections | Lenovo, Motorola Mobility (Rapporteur) | imported from 3GU |
R2‑1914715 | Miscellaneous corrections | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1914716 | Running RRC CR for Introduction of NR eMIMO | Ericsson | imported from 3GU |
R2‑1914717 | Issue of D-PUR reconfiguration and release for CP solution | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914718 | PUCCH MAC CE and SRS MAC CE | Ericsson | imported from 3GU |
R2‑1914719 | CHO for NTN LEO | Ericsson | imported from 3GU |
R2‑1914720 | Remaining issues for D-PUR in IDLE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914721 | Input to TR38.821 on NGSO constellation greater than 600 km | HUGHES Network Systems Ltd | imported from 3GU |
R2‑1914722 | Remaining issues of supporting short eDRX for eMTC connection to 5GC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914723 | Consideration on UE ID of PO calculation for NB-IoT connection to 5GC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914724 | Reduced User Data Interruption for NTN | Ericsson | imported from 3GU |
R2‑1914725 | Remaining issues for accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1914726 | Stop monitoring the paging in NR-U | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1914727 | Running stage 2 CR on positioning (^^[107bis#78][NR Pos] ) | Intel Corporation, ESA | imported from 3GU |
R2‑1914728 | LPP CR Capturing RAN1 parameters for positioning ([107bis#80][NR Pos]) | Intel Corporation | imported from 3GU |
R2‑1914729 | Support of NR dependent positioning methods | Intel Corporation | imported from 3GU |
R2‑1914730 | Assistance data for UE based DL only positioning | Intel Corporation | imported from 3GU |
R2‑1914731 | UE capability on positioning | Intel Corporation | imported from 3GU |
R2‑1914732 | Access Control for SNPN and CAG | Intel Corporation | imported from 3GU |
R2‑1914733 | Parent Selection at IAB nodes during Initial Setup | Intel Corporation | imported from 3GU |
R2‑1914734 | Multi-route support in IAB | Intel Corporation | imported from 3GU |
R2‑1914735 | Flow control in IAB - remaining issues | Intel Corporation | imported from 3GU |
R2‑1914736 | Uplink latency reduction | Intel Corporation | imported from 3GU |
R2‑1914737 | Further discussion on Backhaul RLF handling | Intel Corporation | imported from 3GU |
R2‑1914738 | Handling of Fairness in IAB | Intel Corporation | imported from 3GU |
R2‑1914739 | Conditional Handover for Non-Terrestrial Networks | Intel Corporation | imported from 3GU |
R2‑1914740 | Support of multiple SPS and CG configurations | Intel Corporation | imported from 3GU |
R2‑1914741 | Details for Ethernet header compression solution | Intel Corporation | imported from 3GU |
R2‑1914742 | PDCP duplication with multiple RLC entities | Intel Corporation | imported from 3GU |
R2‑1914743 | UE based PDCP duplication activation/deactivation | Intel Corporation | imported from 3GU |
R2‑1914744 | Security requirement for UE capability enquiry for NR | Intel Corporation, NTT DoCoMo, Ericsson, Apple | imported from 3GU |
R2‑1914745 | Security requirement for UE capability enquiry for LTE | Intel Corporation, NTT DoCoMo, Ericsson, Apple | imported from 3GU |
R2‑1914746 | Restoring RoHC/SDAP during Resume | Intel | imported from 3GU |
R2‑1914747 | Parent Selection at UEs during Initial Setup | Intel Corporation | imported from 3GU |
R2‑1914748 | Remaining issues for reference time delivery | Ericsson | imported from 3GU |
R2‑1914749 | On downlink delay compensation | Ericsson | imported from 3GU |
R2‑1914750 | On support of non-integer multiple of CG/SPS periodicities | Ericsson | imported from 3GU |
R2‑1914751 | SPS and CG remaining config aspects | Ericsson | imported from 3GU |
R2‑1914752 | SPS and CG remaining MAC aspects | Ericsson | imported from 3GU |
R2‑1914753 | Reliability aspects in LCP restriction enhancement | Ericsson | imported from 3GU |
R2‑1914754 | Miscellaneous issues with L2 impacts | Ericsson | imported from 3GU |
R2‑1914755 | Ethernet header compression | Ericsson | imported from 3GU |
R2‑1914756 | On EHC feedback | Ericsson | imported from 3GU |
R2‑1914757 | Handling of de-prioritized MAC PDUs | Ericsson | imported from 3GU |
R2‑1914758 | Main functions of intra-UE data-data prioritization | Ericsson | imported from 3GU |
R2‑1914759 | Intra-UE control-data – SR over PUSCH | Ericsson | imported from 3GU |
R2‑1914760 | Configuration and RRC aspects of PDCP Duplication | Ericsson | imported from 3GU |
R2‑1914761 | Open issues related to MAC CE for PDCP duplication | Ericsson | imported from 3GU |
R2‑1914762 | RRC running CR for NR IIoT | Ericsson | imported from 3GU |
R2‑1914763 | Report of email discussion [107bis#67] [NR - NTN] | Ericsson | imported from 3GU |
R2‑1914764 | CR of TS 36.355 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1914765 | CR of TS 36.331 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1914766 | CR of TS 36.305 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1914767 | Support for Indian Navigation Satellite System (NavIC) | Reliance Jio | imported from 3GU |
R2‑1914768 | Enhancements for low-latency IAB Uplink scheduling | Futurewei Technologies | imported from 3GU |
R2‑1914769 | NR-U specific aspects for 2-step RACH | Qualcomm Incorporated, ZTE | imported from 3GU |
R2‑1914770 | Increased peak data rate for HD-FDD MTC UEs | Qualcomm Incorporated, Orange, Sierra Wireless, Verizon, Ericsson, Sequans, Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914771 | [DRAFT] Rely LS on support of high peak data rate for Cat-M1 UEs in HD-FDD | Qualcomm Incorporated | imported from 3GU |
R2‑1914772 | DRX Active Time for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1914773 | MAC Scheduling Aspects of Multi-TTI Grant | Qualcomm Incorporated | imported from 3GU |
R2‑1914774 | UE impact of second SMTC periodicity | Qualcomm Incorporated | imported from 3GU |
R2‑1914775 | Remaining issues of reference time delivery | Huawei, HiSilicon,China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1914776 | Prioritization issues for MAC CEs and PUSCH | Huawei, HiSilicon | imported from 3GU |
R2‑1914777 | Remaining issues for EHC | Huawei, HiSilicon | imported from 3GU |
R2‑1914778 | Support non-compressed packets transmission without context establishment in EHC | Huawei, HiSilicon | imported from 3GU |
R2‑1914779 | Solutions to mitigate the periodicity misalignment between TSC traffic and CG/SPS | Huawei, HiSilicon | imported from 3GU |
R2‑1914780 | Remaining issues for CG/SPS configurations | Huawei, HiSilicon | imported from 3GU |
R2‑1914781 | New Confirmation MAC CE for multiple CG configurations | Huawei, HiSilicon | imported from 3GU |
R2‑1914782 | Discussion on mapping between LCH and CG configurations | Huawei, HiSilicon | imported from 3GU |
R2‑1914783 | UE autonomous transmission in a CG resource for deprioritized data | Huawei, HiSilicon, SIA | imported from 3GU |
R2‑1914784 | Network controlled activation/deactivation of PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1914785 | Cell restriction for PDCP duplication with up to 4 legs | Huawei, HiSilicon | imported from 3GU |
R2‑1914786 | Discussion on multiplexing of data | Huawei, HiSilicon | imported from 3GU |
R2‑1914787 | Discussion on DL LBT failure impact on RLF triggering | Huawei, HiSilicon | imported from 3GU |
R2‑1914788 | Updates to reestablishment procedure | ZTE Corporation, Sanechips, Intel Corporation, CATT | imported from 3GU |
R2‑1914789 | Idle Mode cell reselection based on CN type supported | Qualcomm Incorporated | imported from 3GU |
R2‑1914790 | LBT aspects of 2-step RACH MSGA | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914791 | LBT failure report on SCell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914792 | Multiple Msg1 transmission opportunities | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914793 | RAR MAC PDU design for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914794 | Multiple configured grants | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914795 | Remaining issues of paging for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914796 | Remaining open issues for 2-step CBRA | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914797 | Consideration on the MsgB RA-RNTI calculation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914798 | Running MAC CR for 2-step RACH | ZTE Corporation (email rapporteur) | imported from 3GU |
R2‑1914799 | Summary of running MAC CR review issue list | ZTE Corporation (email rapporteur) | imported from 3GU |
R2‑1914800 | Support of CFRA with 2-step RACH | ZTE Corporation, Sanechips, Vivo, Oppo, Fujitsu, Qualcomm, InterDigital, Intel | imported from 3GU |
R2‑1914801 | UAC information change indication in 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1914802 | UE identity for CIoT/5GC UP Optimization and RRC indication to upper layers | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1914803 | PTW support for RRC_INACTIVE state with short eDRX | Qualcomm Incorporated | imported from 3GU |
R2‑1914804 | UE capability co-ordination signalling aspects for DAPS HO | Qualcomm India Pvt Ltd, Google Inc, Apple Inc, Charter Communications, MediaTek | imported from 3GU |
R2‑1914805 | Mobility Robustness enhancement for combined CHO and DAPS HO | Qualcomm Incorporated | imported from 3GU |
R2‑1914806 | IAB workplan update | Qualcomm Incorporated (Rapporteur) | imported from 3GU |
R2‑1914807 | LTE DAPS handover UE RF chain requirements | Qualcomm India Pvt Ltd, Google Inc, Apple Inc, Charter Communications, Intel Corporation | imported from 3GU |
R2‑1914808 | IAB BAP upstream routing | Qualcomm Incorporated | imported from 3GU |
R2‑1914809 | TP to running NR_IAB CR to 38340 on BAP functional view | Qualcomm Incorporated | imported from 3GU |
R2‑1914810 | Clarification on security key change and bearer termination point change | ZTE Corporation, Ericsson, Intel | imported from 3GU |
R2‑1914811 | Clarification of NR-DC synchronization | ZTE Corporation | imported from 3GU |
R2‑1914812 | Further issues on CHO configuration and execution | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914813 | Discussion on CHO execution condition | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914814 | Discussion on fast RLF recovery when applying CHO and fast MCG recovery | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914815 | Discussion on combination of DAPS and CHO | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914816 | Discussion on conditional PSCell addition and change | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914817 | Discussion on release of source cell in DAPS HO | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914818 | Remaing aspects of control plane handling in DAPS HO | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914819 | Remaining issues on UE capability coordination | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914820 | Remaining Issues on Early Measurements | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914821 | Inter-RAT Operation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914822 | Scell dormancy behaviour | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914823 | On SCG suspension | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914824 | Maintaining SCG Configuration in Resume procedure | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914825 | Further issues on MCG fast recovery | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914826 | Configuration for MCG fast recovery | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914827 | IAB BAP layer control messages | Qualcomm Incorporated | imported from 3GU |
R2‑1914828 | IAB scheduling support | Qualcomm Incorporated | imported from 3GU |
R2‑1914829 | [DRAFT] LS on IAB scheduling support | Qualcomm Incorporated | imported from 3GU |
R2‑1914830 | IAB load reporting to IAB-donor CU-CP | Qualcomm Incorporated | imported from 3GU |
R2‑1914831 | IAB flow control feedback info | Qualcomm Incorporated | imported from 3GU |
R2‑1914832 | [107bis#53][NR LTE MobE] UE capability structure DAPS/RUDI HO (Intel)- | Intel Corporation | imported from 3GU |
R2‑1914833 | RRC running CR for NR mobility on DAPS HO ( [107bis#54]) | Intel Corporation | imported from 3GU |
R2‑1914834 | RRC running CR for NR mobility on CHO ( [107bis#54]) | Intel Corporation | imported from 3GU |
R2‑1914835 | Summary of open issues on RRC running CR-DAPS ( [107bis#54]) | Intel Corporation | imported from 3GU |
R2‑1914836 | Control plane consideration for dual active protocol stack (DAPS) based RUDI HO | Intel Corporation, Qualcomm Inc, Charter Communications, Mediatek Inc, Apple | imported from 3GU |
R2‑1914837 | Handling of CHO configuration and requirement (compliance check) | Intel Corporation | imported from 3GU |
R2‑1914838 | SDAP and PDCP handling for DAPS HO | Intel Corporation | imported from 3GU |
R2‑1914839 | Handling of measurement configuration for execution condition | Intel Corporation | imported from 3GU |
R2‑1914840 | DAPS failure handling | Intel Corporation | imported from 3GU |
R2‑1914841 | UE Feature list for Rel-16 Mobility Enhancement | Intel Corporation | imported from 3GU |
R2‑1914842 | Other User Plane Stage-3 issues on 2-Step RACH | Intel Corporation | imported from 3GU |
R2‑1914843 | Remaining issues on PUSCH resource unit selection for 2-step RACH | Intel Corporation | imported from 3GU |
R2‑1914844 | LBT impact on MsgA | Intel Corporation | imported from 3GU |
R2‑1914845 | PDCCH-WUS operation with CDRX | Intel Corporation | imported from 3GU |
R2‑1914846 | UE assistance for C-DRX, SCell and moving UE out of RRC_CONNECTED | Intel Corporation | imported from 3GU |
R2‑1914847 | Relaxation of RRM measurements | Intel Corporation | imported from 3GU |
R2‑1914848 | Left issues on NR SL MAC design | Intel Corporation | imported from 3GU |
R2‑1914849 | Considerations on SL RLM/RLF procedure | Intel Corporation | imported from 3GU |
R2‑1914850 | On HARQ feedback support for NR SL | Intel Corporation | imported from 3GU |
R2‑1914851 | Remaining issues on sidelink configured grant design | Intel Corporation | imported from 3GU |
R2‑1914852 | SL UE capability aspects | Intel Corporation | imported from 3GU |
R2‑1914853 | Cross-RAT scheduling for NR V2X SL | Intel Corporation | imported from 3GU |
R2‑1914854 | Discussion of the Working assumption on Measurement configuration during INACTIVE | Intel Corporation | imported from 3GU |
R2‑1914855 | Summary of open issues on RRC running CR-CHO ( [107bis#54]) | Intel Corporation | imported from 3GU |
R2‑1914856 | Remaning issues on the support of 5GCN connectivity | Intel Corporation | imported from 3GU |
R2‑1914857 | Use of extended DRX in RRC inactive state | Intel Corporation | imported from 3GU |
R2‑1914858 | Additional issues in D-PUR in RRC_IDLE | Intel Corporation | imported from 3GU |
R2‑1914859 | Non-BL UE operation in standalone deployment | Intel Corporation | imported from 3GU |
R2‑1914860 | Introduction of Rel-16 eMTC enhancements | Intel Corporation | imported from 3GU |
R2‑1914861 | Non-BL UE in normal and enhanced coverage | Intel Corporation | imported from 3GU |
R2‑1914862 | UE capability for 2-step RACH | Intel Corporation | imported from 3GU |
R2‑1914863 | Open issues on Configuration of MCG failure indication and timer T316 | Intel Corporation | imported from 3GU |
R2‑1914864 | Draft LS on Uplink LBT failure indication | Qualcomm Incorporated | imported from 3GU |
R2‑1914865 | Considerations for Geographical Zone Design for NR V2X | InterDigital | imported from 3GU |
R2‑1914866 | RAN2 Aspects of HARQ for NR V2X | InterDigital | imported from 3GU |
R2‑1914867 | Need for LCP Restriction on MCR | InterDigital, Apple, OPPO, Ericsson, Mediatek, CATT, Convida Wireless, Spreadtrum, Fraunhaufer HHI, Fraunhaufer IIS | imported from 3GU |
R2‑1914868 | Remaining Aspects of UL/SL Prioritization | InterDigital | imported from 3GU |
R2‑1914869 | Multiple SL Configured Grants and UE Assistance | InterDigital | imported from 3GU |
R2‑1914870 | RAN2 Aspects of CSI Reporting | InterDigital | imported from 3GU |
R2‑1914871 | RLM/RLF for NR V2X | InterDigital | imported from 3GU |
R2‑1914872 | RAN2 Aspects of Simultaneous Configuration of Mode 1 and Mode 2 | InterDigital | imported from 3GU |
R2‑1914873 | Implementing Starvation Avoidance for NR V2X | InterDigital | imported from 3GU |
R2‑1914874 | Handling the SCG Configuration in RRC Resume | InterDigital, Ericsson, LG, OPPO, KT Corp | imported from 3GU |
R2‑1914875 | Control Plane Aspects of DAPS HO | InterDigital | imported from 3GU |
R2‑1914876 | On Combining RUDI and CHO | InterDigital | imported from 3GU |
R2‑1914877 | Conditional PSCell addition/change | InterDigital | imported from 3GU |
R2‑1914878 | Intra-UE Prioritization for Overlapping PUSCHs | InterDigital | imported from 3GU |
R2‑1914879 | L2 aspects of priority level indication | InterDigital | imported from 3GU |
R2‑1914880 | Intra UE Prioritization between SR and PUSCH | InterDigital | imported from 3GU |
R2‑1914881 | Paging Procedure in NR-U | InterDigital | imported from 3GU |
R2‑1914882 | Handling UL LBT Failures | InterDigital | imported from 3GU |
R2‑1914883 | RLM and RLF for NR-U | InterDigital | imported from 3GU |
R2‑1914884 | PDCP security issue about duplicate detection | Samsung, LG Electronics Inc., Nokia, Nokia Shanghai Bell, LG Uplus | imported from 3GU |
R2‑1914885 | Down-scoping of DAPS HO scenarios for NR | Qualcomm Incorporated | imported from 3GU |
R2‑1914886 | On Maximum Number of CHO Candidate Cells and Nodes | Charter Communications, Inc | imported from 3GU |
R2‑1914887 | CR on PDCP security issue | Samsung, LG Electronics Inc., Nokia, Nokia Shanghai Bell, LG Uplus | imported from 3GU |
R2‑1914888 | Compliance Check for CHO Target Cell Configurations | MediaTek Inc. | imported from 3GU |
R2‑1914889 | Measurement Report for Conditional Handover Procedures | MediaTek Inc. | imported from 3GU |
R2‑1914890 | Report of Email Discussion 107bis#68 Power Saving RRM Measurement Relaxation | MediaTek Inc. | imported from 3GU |
R2‑1914891 | NR Paging Frame Calculation when SearchSpaceId is Zero | MediaTek Inc. | imported from 3GU |
R2‑1914892 | CN Type Indication for Cell Reselection from NR to LTE | MediaTek Inc. | imported from 3GU |
R2‑1914893 | Discussion on RRC reestablishment initiated by failure of MCG failure recovery | SHARP | imported from 3GU |
R2‑1914894 | Allow Delta Configuration of ParametersListFmt2 and ParametersListEDTFmt2 in SIB2-NB | MediaTek Inc., ZTE Corporation, Sanechips, Huawei, HiSilicon | imported from 3GU |
R2‑1914895 | Support of dormancy SCG | OPPO | imported from 3GU |
R2‑1914896 | Draft LS on support of dormancy SCG | OPPO | imported from 3GU |
R2‑1914897 | PDCP Running CR for NR IIOT | PDCP Rapporteur (LG Electronics Inc.) | imported from 3GU |
R2‑1914898 | PDCP open issues for IIOT | PDCP Rapporteur (LG Electronics Inc.) | imported from 3GU |
R2‑1914899 | Redundant retransmission in PDCP duplication | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1914900 | MAC CE format for PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1914901 | Handling of RLC stuck problem with PDCP duplication | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1914902 | Reduced PDCCH monitoring in CA | LG Electronics Inc. | imported from 3GU |
R2‑1914903 | ON Duration adaptation | LG Electronics Inc., LG Uplus, Vivo | imported from 3GU |
R2‑1914904 | Conditional presence on ue-CapabilityInfo and servCellIndexRangeSCG for inter-MN handover without SN change | NTT DOCOMO, INC., Ericsson | imported from 3GU |
R2‑1914905 | Measurement coordination on maxMeasIdentitiesSCG in MR-DC | ZTE Corporation, Sanechips, Ericsson, NEC, CATT | imported from 3GU |
R2‑1914906 | Corrections on maxMeasIdentitiesSCG in MR-DC | ZTE Corporation, Sanechips, Ericsson, NEC, CATT | imported from 3GU |
R2‑1914907 | CR to introduce timer for DRX based SFTD measurement | ZTE Corporation, Sanechips, MediaTek Inc. | imported from 3GU |
R2‑1914908 | CR to INM on absence of gapPurpose | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914909 | Consideration on DRX coordination in ANR | ZTE Corporation, Sanechips, NEC | imported from 3GU |
R2‑1914910 | Corrections on DRX coordination in ANR | ZTE Corporation, Sanechips, NEC | imported from 3GU |
R2‑1914911 | [107bis#34]Correction on ambiguity of UE FDD&TDD FR1&FR2 capabilities | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1914912 | Remaining issues for UTRAN measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914913 | Discussion on measurement relaxation rule in time domain | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914914 | Report of [107#81][NR TEI16] Need-for-Gaps signalling | MediaTek Inc. | imported from 3GU |
R2‑1914915 | Further discussion on NeedForGap | MediaTek Inc. Huawei, HiSilicon | imported from 3GU |
R2‑1914916 | Dual SMTC in IDLE mode | MediaTek Inc. | imported from 3GU |
R2‑1914917 | Discussion on early measurement configuration upon state transition | MediaTek Inc. | imported from 3GU |
R2‑1914918 | Remaining issues on BH RLF notification | vivo | imported from 3GU |
R2‑1914919 | [Draft] LS on BH RLF notification verification | vivo | imported from 3GU |
R2‑1914920 | Discussion on IAB BH RLF report mechanism | vivo | imported from 3GU |
R2‑1914921 | Running CR to 37324 for 5G_V2X_NRSL | vivo (Rapporteur) | imported from 3GU |
R2‑1914922 | Left Issues on NR SL RLC and PDCP | vivo | imported from 3GU |
R2‑1914923 | Left issues for UL SL prioritization | vivo | imported from 3GU |
R2‑1914924 | Remaining issues on HARQ support for NR Sidelink | vivo | imported from 3GU |
R2‑1914925 | Left LCP issues | vivo | imported from 3GU |
R2‑1914926 | CSI and RSRP reporting | vivo | imported from 3GU |
R2‑1914927 | Resource pool (re-)selection based on HARQ feedback | vivo | imported from 3GU |
R2‑1914928 | Discussion on SR and BSR | vivo | imported from 3GU |
R2‑1914929 | Discussion on Truncated Sidelink BSR | vivo | imported from 3GU |
R2‑1914930 | Remaining issues on sidelink configured grant | vivo | imported from 3GU |
R2‑1914931 | Remaining issues on PC5-RRC message exchange | vivo | imported from 3GU |
R2‑1914932 | Discussion on sideink radio link management without physical layer indications | vivo | imported from 3GU |
R2‑1914933 | Signaling procedure for QoS and SLRB management | vivo | imported from 3GU |
R2‑1914934 | Mode switch for QoS guarantee in NR V2X | vivo | imported from 3GU |
R2‑1914935 | Signaling content for QoS and SLRB management | vivo | imported from 3GU |
R2‑1914936 | Running CR to 37.340 for CA_DC enhancements | vivo, Ericsson | imported from 3GU |
R2‑1914937 | Power control for NR DC | vivo | imported from 3GU |
R2‑1914938 | Remaining issues for Validity Area | vivo | imported from 3GU |
R2‑1914939 | Early Measurement Reporting for INACTIVE State | vivo | imported from 3GU |
R2‑1914940 | UE measurement behaviour regarding autonomous state transition | vivo | imported from 3GU |
R2‑1914941 | IDC impact for early measurement | vivo | imported from 3GU |
R2‑1914942 | Speed Up CA/DC setup during RRC Connection Re-establishment | vivo | imported from 3GU |
R2‑1914943 | Dormancy-like behavior on SCell | vivo | imported from 3GU |
R2‑1914944 | UE behavior for suspended SCG | vivo | imported from 3GU |
R2‑1914945 | Remaining issues on MCG fast recovery | vivo | imported from 3GU |
R2‑1914946 | Remaining issues for Logged MDT | vivo | imported from 3GU |
R2‑1914947 | UE capability parameters for SON_MDT | vivo | imported from 3GU |
R2‑1914948 | Running CR to 38.306 for NR_SON_MDT | vivo | imported from 3GU |
R2‑1914949 | Autonomous Gap capability for CGI reporting | vivo, Ericsson, Huawei, HiSilicon | imported from 3GU |
R2‑1914950 | [Draft] Reply LS on autonomous gap capability | vivo | imported from 3GU |
R2‑1914951 | Discussion on Suspended SCG | MediaTek Inc. | imported from 3GU |
R2‑1914952 | Capability for early measurement reporting | MediaTek Inc. | imported from 3GU |
R2‑1914953 | Capability for fast DC/CA setup | MediaTek Inc. | imported from 3GU |
R2‑1914954 | UE Capability for NR-U Support | vivo | imported from 3GU |
R2‑1914955 | Clarification on measurement gap configuration in NR SA | MediaTek Inc., Nokia (Rapporteur), Samsung, ZTE Corporation, Sanechips, Intel | imported from 3GU |
R2‑1914956 | Consideration on the Consumers of AMF service on Event Exposure | BUPT | imported from 3GU |
R2‑1914957 | Enhancement to the Namf_Communication_ AMFStatusChangeNotify service operation | BUPT | imported from 3GU |
R2‑1914958 | Clarification on the uplink skipping | vivo | imported from 3GU |
R2‑1914959 | Propagation delay compensation for reference time | vivo | imported from 3GU |
R2‑1914960 | Remaining issues for EHC | vivo | imported from 3GU |
R2‑1914961 | Discussion on LCID restriction | vivo | imported from 3GU |
R2‑1914962 | Discussion on the periodicity misalignment between TSC traffic and SPS/CG | vivo | imported from 3GU |
R2‑1914963 | Reference cell for the dedicated provisioning of timing information | vivo | imported from 3GU |
R2‑1914964 | URLLC transmission within measurement gap | vivo | imported from 3GU |
R2‑1914965 | SPS and CG configuration issue on the partial overlapping TSN traffic pattern | vivo | imported from 3GU |
R2‑1914966 | Discussion on the MAC PDU recovery procedure | vivo | imported from 3GU |
R2‑1914967 | Discussion on the support of DC+CA duplication | vivo | imported from 3GU |
R2‑1914968 | Remaining issues for SR and PUSCH collision | vivo | imported from 3GU |
R2‑1914969 | Discussion on the UE handling for the equal priority of uplink grants | vivo | imported from 3GU |
R2‑1914970 | Issue on the Namf_Communication_ AMFStatusChangeSubscribe service operation | BUPT | imported from 3GU |
R2‑1914971 | Issue on the Namf_Communication_AMFStatusChangeUnSubscribe operation | BUPT | imported from 3GU |
R2‑1914972 | Clarification on PSCell/SCell SI reception | MediaTek Inc. | imported from 3GU |
R2‑1914973 | location based mobility enhancement | NEC | imported from 3GU |
R2‑1914974 | service contiunity | NEC | imported from 3GU |
R2‑1914975 | IAB backhaul RLF handling | NEC | imported from 3GU |
R2‑1914976 | Flow control in IAB | NEC | imported from 3GU |
R2‑1914977 | Consideration on E-CID in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1914978 | Discussion on sigalling design for NR DL positioning procedures | Huawei, HiSilicon | imported from 3GU |
R2‑1914979 | Considerations on UL procedures for NR positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1914980 | Further considerations on DL procedures for NR positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1914981 | Discussion on broadcasting of positioning assistance data | Huawei, HiSilicon | imported from 3GU |
R2‑1914982 | Discussion on demand SI in connected mode for positioning | Huawei, HiSilicon | imported from 3GU |
R2‑1914983 | Correction on the EUTRAN terminology | Huawei, HiSilicon | imported from 3GU |
R2‑1914984 | CHO execution with multiple candidate cells before HOF | Futurewei | imported from 3GU |
R2‑1914985 | Remaining issues on procedure and signaling of CPAC | Futurewei | imported from 3GU |
R2‑1914986 | Handling of multiple candidate cells for CPAC | Futurewei | imported from 3GU |
R2‑1914987 | Discussion on PDCCH-WUS missing problems during BWP switching and handover | Xiaomi Communications | imported from 3GU |
R2‑1914988 | Procedures on how the PDCCH-WUS works with C-DRX | Xiaomi Communications | imported from 3GU |
R2‑1914989 | Text Proposal for adding the Phase Bias Indicator to the SSR Phase Bias message | Swift Navigation, Ericsson | imported from 3GU |
R2‑1914990 | Some remaining issues on the CSI and SRS reporting | Xiaomi Communications | imported from 3GU |
R2‑1914991 | Timing of Key Derivation in Conditional Handover | Futurewei | imported from 3GU |
R2‑1914992 | Draft LS on the Timing of AS Key Derivation in Conditional Handover | Futurewei | imported from 3GU |
R2‑1914993 | Handling of Key Derivation in Conditional PSCell Addition/Change | Futurewei | imported from 3GU |
R2‑1914994 | Adaptation of QoS Flow to DRB Mapping for MDBV Enforcement | Futurewei | imported from 3GU |
R2‑1914995 | Reception of End-Marker upon QoS Flow Remapping | Futurewei | imported from 3GU |
R2‑1914996 | Proposal for clarification and optimization of n90 UE capability | KDDI Corporation | imported from 3GU |
R2‑1914997 | Configuration of PDCP duplication with up to 4 RLC entities | Sharp | imported from 3GU |
R2‑1914998 | Discussion on sidelink SR trigger | Fujitsu | imported from 3GU |
R2‑1914999 | MAC CE structure for PDCP duplication activation/deactivation | Fujitsu | imported from 3GU |
R2‑1915000 | NW-based per-packet PDCP duplication | Fujitsu | imported from 3GU |
R2‑1915001 | Considerations on MsgB reception | Fujitsu | imported from 3GU |
R2‑1915002 | On open questions to 2-step CF-RACH | Fujitsu | imported from 3GU |
R2‑1915003 | SR_COUNTER initialization due to RRC reconfiguration | Fujitsu, LG Electronics Inc. | imported from 3GU |
R2‑1915004 | Deactivation of Primary Path | Sharp | imported from 3GU |
R2‑1915005 | RA Prioritization for MPS for 2-step RACH | Perspecta Labs, ECD, AT&T, T-Mobile, Sprint, Ericsson, Qualcomm | imported from 3GU |
R2‑1915006 | PRACH prioritization parameters for MPS and MCS | Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | imported from 3GU |
R2‑1915007 | PRACH prioritization procedure for MPS and MCS | Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | imported from 3GU |
R2‑1915008 | Discussion on RACH report | SHARP | imported from 3GU |
R2‑1915009 | Further discussion on RLF recovery in CHO | SHARP | imported from 3GU |
R2‑1915010 | Fast SN Activation in Handover to EN-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1915011 | Paging monitoring in NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1915012 | [Draft] LS on clarification and optimization of n90 UE Capability | KDDI Corporation | imported from 3GU |
R2‑1915013 | Remaining issues on priority handling in NR V2X | Spreadtrum Communications | imported from 3GU |
R2‑1915014 | [Draft] LS on priority indicaition in SCI | Spreadtrum Communications | imported from 3GU |
R2‑1915015 | LBT Failures Handling in Non-Connected State | Spreadtrum Communications, Huawei, HiSilicon | imported from 3GU |
R2‑1915016 | Inconsecutive UL LBT Failures Handling | Spreadtrum Communications | imported from 3GU |
R2‑1915017 | Handling of periodicity misalignment between CG and TSN traffic | Spreadtrum Communications | imported from 3GU |
R2‑1915018 | Equal priority handling for CG and CG collision | Spreadtrum Communications | imported from 3GU |
R2‑1915019 | Consideration on selective PDCP duplication | Spreadtrum Communications | imported from 3GU |
R2‑1915020 | Consideration on early measurement reporting | Spreadtrum Communications | imported from 3GU |
R2‑1915021 | Early measurement in NR-U | Spreadtrum Communications | imported from 3GU |
R2‑1915022 | Measurement report enhancement in conditional handover | Spreadtrum Communications | imported from 3GU |
R2‑1915023 | RRC signaling size restriction in CHO | Spreadtrum Communications | imported from 3GU |
R2‑1915024 | Remaining issues for Conditional PSCell Change | Spreadtrum Communications | imported from 3GU |
R2‑1915025 | Clarification on NR suitable cell for NR re-establishment | Spreadtrum Communications | imported from 3GU |
R2‑1915026 | Enhancements of resuming MR-DC configuration with RRC Resume | Spreadtrum Communications | imported from 3GU |
R2‑1915027 | Left issues on LCP procedure | Spreadtrum Communications | imported from 3GU |
R2‑1915028 | Consideration on activation and deactivation of PDCP duplication | Spreadtrum Communications | imported from 3GU |
R2‑1915029 | Skipping supportedBandCombinationList of n90 | KDDI Corporation | imported from 3GU |
R2‑1915030 | TB construction during LCP procedure | MediaTek Inc. | imported from 3GU |
R2‑1915031 | KgNB derivation upon mobility | Qualcomm Incorporated | imported from 3GU |
R2‑1915032 | Summary of email discussion [107bis#46][NR TEI16] Voice fallback | Qualcomm Incorporated | imported from 3GU |
R2‑1915033 | Introduction of voice fallback indication | Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | imported from 3GU |
R2‑1915034 | Introduction of voice fallback indication | Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | imported from 3GU |
R2‑1915035 | Draft LS on RRC establishment cause value in EPS fallback | Qualcomm Incorporated | imported from 3GU |
R2‑1915036 | Discussion on RAN1 agreements related to PUR | Nokia Solutions & Networks (I) | imported from 3GU |
R2‑1915037 | Combination of CHO and RUDI Handover | ETRI | imported from 3GU |
R2‑1915038 | Faster Handover Failure Recovery | ETRI | imported from 3GU |
R2‑1915039 | Remaining FFSs on Data Forwarding for DAPS HO and CHO | ETRI | imported from 3GU |
R2‑1915040 | Bye Message for DAPS Handover | ETRI | imported from 3GU |
R2‑1915041 | Source Cell Release in DAPS Handover | ETRI | imported from 3GU |
R2‑1915042 | Further consideration on access control aspect | III | imported from 3GU |
R2‑1915043 | Mobility state in RLF | Qualcomm Incorporated | imported from 3GU |
R2‑1915044 | RACH Report | Qualcomm Incorporated | imported from 3GU |
R2‑1915045 | RACH Failure information | Qualcomm Incorporated | imported from 3GU |
R2‑1915046 | Management Based Logged MDT Configuration for RRC_INACTIVE | Qualcomm Incorporated | imported from 3GU |
R2‑1915047 | Clarification on PO calculation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915048 | Cross-RAT RLF report | Qualcomm Incorporated | imported from 3GU |
R2‑1915049 | Cross-system RLF report | Qualcomm Incorporated | imported from 3GU |
R2‑1915050 | Logged MDT Configuration and Reporting for MR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1915051 | CR on multiple SMTC for idle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915052 | Fallback procedure for INACTIVE mode | Samsung | imported from 3GU |
R2‑1915053 | UE History Information | Qualcomm Incorporated | imported from 3GU |
R2‑1915054 | UE History Information | Qualcomm Incorporated | imported from 3GU |
R2‑1915055 | Discussion about Successful HO in MRO | Qualcomm Incorporated | imported from 3GU |
R2‑1915056 | Open issues in DCCA WI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915057 | Wideband operation in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915058 | Paging in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915059 | early measurements and 2-step resume | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915060 | Early measurement handling during reselection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915061 | UE capabilities for early measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915062 | Fast Scell Activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915063 | Configuration of MCG failure recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915064 | CR on how to introduce x-scheduling with different numerologies | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915065 | Multiple SMTC for Idle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915066 | Unnecessary deciphering for duplicated PDUs | Samsung | imported from 3GU |
R2‑1915067 | CR on unnecessary deciphering for duplicated PDU | Samsung | imported from 3GU |
R2‑1915068 | Trigger Conditions for low-latency IAB Uplink Scheduling | ITRI | imported from 3GU |
R2‑1915069 | RA variables for 2-step RACH fallback procedure | ITRI | imported from 3GU |
R2‑1915070 | Msg1 transmission opportunities | ITRI | imported from 3GU |
R2‑1915071 | T312 mechanism for conditional handover | ITRI | imported from 3GU |
R2‑1915072 | Discussion on the paging opportunities overlapping for the NR-U | ITRI | imported from 3GU |
R2‑1915073 | Discussion on TAI list provisioning and TAU triggering | ITRI | imported from 3GU |
R2‑1915074 | Discussion on the information for parent node selection | ITRI | imported from 3GU |
R2‑1915075 | Feedback for EHC algorithm | Samsung | imported from 3GU |
R2‑1915076 | Configuration limitation for RRCRelease message in R15 | OPPO | imported from 3GU |
R2‑1915077 | SDAP control PDU handling in Rel-16 EHC | Samsung | imported from 3GU |
R2‑1915078 | Left issues on SDAP Rx behaviour on remapping | OPPO, Ericsson, Apple, Qualcomm Incorporated, Intel Corporation, ITL, InterDigital, MediaTek Inc., Samsung, Beijing Xiaomi Software Tech, Nokia, Nokia Shanghai Bell, ASUSTeK, Spreadtrum Communications, Convida Wireless, LG Electronics Inc., Lenovo, Motoro | imported from 3GU |
R2‑1915079 | UE radio capability ID exchange over X2/Xn and S1/NG interface | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915080 | Introduction of UE radio capability ID in inter-node RRC messages | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915081 | TP on RACH capacity calculation based on typical cell size | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915082 | Remaining issues in NTN-TN service continuity | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915083 | Location report to help apply country specific policies | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915084 | Satellite type differentiation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915085 | Consideration on ephemeris data handling | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915086 | Remaining issues in efficient state transition by UE assistance | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915087 | Remaining issues in C-DRX and Scell related UE assistance information | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915088 | Remaining issues on SI request procedure in RRC_CONNECTED | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915089 | Consideration on the PCI Range | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915090 | Overview of the Connected State Issues | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915091 | Consideration on the HRNN and Access control | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915092 | Scheduling enhancements for TSC network | OPPO | imported from 3GU |
R2‑1915093 | Discussion on confirmation MAC CE for TSC network | OPPO | imported from 3GU |
R2‑1915094 | Discussion on Ethernet Header Compression | OPPO | imported from 3GU |
R2‑1915095 | Consideration on UE autonomous retx for the deprioritized MAC PDU | OPPO | imported from 3GU |
R2‑1915096 | Issues on ignoring the received UL grant for deprioritized PDU | OPPO,Sony,Huawei, HiSilicon, ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915097 | Intra-UE prioritization involving configured grant | OPPO | imported from 3GU |
R2‑1915098 | Discussion on SR cancelling on intra-UE prioritization involving SR | OPPO | imported from 3GU |
R2‑1915099 | Intra-UE prioritization between multiple SRs | OPPO | imported from 3GU |
R2‑1915100 | Discussion on data duplication enhancement in IIoT | OPPO | imported from 3GU |
R2‑1915101 | Discussion on UE-based data duplication enhancement | OPPO | imported from 3GU |
R2‑1915102 | Cell restriction for PDCP duplication in IIoT | OPPO | imported from 3GU |
R2‑1915103 | LBT impact to Multi-PUSCH scheduling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915104 | Multiple active Configured Grants | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915105 | UE behavior upon consistent LBT failure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915106 | SL HARQ protocol operation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915107 | SR trigger for NR SL | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915108 | SL LCP procedure considering the MCR requirements | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915109 | Details of SCell Beam Failure Recovery Procedure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915110 | Discussion on BAP configuration | ZTE, Sanechips | imported from 3GU |
R2‑1915111 | Further consideration on bearer mapping | ZTE, Sanechips | imported from 3GU |
R2‑1915112 | Consideration on routing in IAB | ZTE, Sanechips | imported from 3GU |
R2‑1915113 | Discussion on re-routing in IAB network | ZTE, Sanechips | imported from 3GU |
R2‑1915114 | Further consideration on flow control in IAB | ZTE, Sanechips | imported from 3GU |
R2‑1915115 | Discussion on BAP control PDU | ZTE, Sanechips | imported from 3GU |
R2‑1915116 | Discussion on low latency scheduling in IAB | ZTE, Sanechips | imported from 3GU |
R2‑1915117 | Discussion on case-1 OTA timing alignment | ZTE, Sanechips | imported from 3GU |
R2‑1915118 | Consideration on the Extended LCID in IAB | ZTE, Sanechips | imported from 3GU |
R2‑1915119 | Discussion on IAB BH RLF handling | ZTE, Sanechips | imported from 3GU |
R2‑1915120 | Discussion on BH RLC channel configuration in IAB network | ZTE, Sanechips | imported from 3GU |
R2‑1915121 | Discussion on IAB node connection setup | ZTE, Sanechips | imported from 3GU |
R2‑1915122 | PDCP version in EN-DC | Ericsson | imported from 3GU |
R2‑1915123 | Discussion on leftover issues of Inter-RAT measurement | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1915124 | Discussion on SRVCC capability | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1915125 | Running CR for the introduction of SRVCC from 5G to 3G | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1915126 | Consideration on UL low-latency scheduling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915127 | Pre-emptive BSR in multiple connection scenario | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915128 | Cell selection for IAB RLF recovery | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915129 | RLF notification to downstream IAB node | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915130 | Remaining issues for failure handling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915131 | Remaining issue for SL-BSR | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915132 | Considerations on QoS based resource pool for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915133 | Remaining issue on support non-integer periodicity for TSN traffic | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915134 | SLRB configuration for NR V2X UE | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915135 | Discussion on QoS management for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915136 | Paging probability information based UE grouping | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915137 | Consideration on WUS configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915138 | Remaining issue on ANR reporting | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915139 | Solution for intra-UE prioritization | Huawei, HiSilicon | imported from 3GU |
R2‑1915140 | Remaining issues on 4-step RACH for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1915141 | Handling of UL LBT failure | Huawei, HiSilicon | imported from 3GU |
R2‑1915142 | Enhancement on two-step Random Access for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1915143 | Discussion on PDU overwriting between CG and DG | Huawei, HiSilicon | imported from 3GU |
R2‑1915144 | Support of multiple active CGs for NRU | Huawei, HiSilicon | imported from 3GU |
R2‑1915145 | Impacts of Cross-COT HARQ feedback to BWP and Scell | Huawei, HiSilicon | imported from 3GU |
R2‑1915146 | Handling MIB_SIB1 Acquisition Failure | Huawei, HiSilicon | imported from 3GU |
R2‑1915147 | BSR and SR reporting in Cross RAT V2X operation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915148 | Cross RAT SL Configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915149 | HARQ feedback impact on RAN2 | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915150 | RLM Procedure and RLF Recovery handling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915151 | Transmitter UE behavior in Mode 1 and Mode 2 | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915152 | SL and UL BWP Numerology Mismatch | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1915153 | Failure handling for conditional PScell change and addition | OPPO | imported from 3GU |
R2‑1915154 | SRB handling for DAPS handover | OPPO | imported from 3GU |
R2‑1915155 | Further considerations on capability coordination | OPPO | imported from 3GU |
R2‑1915156 | Clarification on HRNN reporting | OPPO | imported from 3GU |
R2‑1915157 | SCell BFR MAC CE design | OPPO | imported from 3GU |
R2‑1915158 | MAC CE design for eMIMO | OPPO | imported from 3GU |
R2‑1915159 | Further considerations for T312-based mechanism | OPPO | imported from 3GU |
R2‑1915160 | Compliance check for CHO configuration | OPPO | imported from 3GU |
R2‑1915161 | CHO configuration handling upon source configuration update | OPPO | imported from 3GU |
R2‑1915162 | UE capabilities for DAPS HO | OPPO | imported from 3GU |
R2‑1915163 | Recovery for deprioritized data transmission | NTT DOCOMO, INC. | imported from 3GU |
R2‑1915164 | L2 impacts on supporting IIoT traffic | NTT DOCOMO, INC. | imported from 3GU |
R2‑1915165 | (De)Prioritizing the Access for IAB Setup | Samsung | imported from 3GU |
R2‑1915166 | Discussion on CG and SPS in NTN | OPPO | imported from 3GU |
R2‑1915167 | Discussion on DRX operation in NTN | OPPO | imported from 3GU |
R2‑1915168 | Discussion on time advance in NTN | OPPO | imported from 3GU |
R2‑1915169 | Discussion on UL scheduling enhancement in NTN | OPPO | imported from 3GU |
R2‑1915170 | Discussion on handover for NTN | OPPO | imported from 3GU |
R2‑1915171 | NR RAT-Dependent Positioning Procedures | LG Electronics Inc. | imported from 3GU |
R2‑1915172 | On indicating LBT failure for NR-U | Samsung | imported from 3GU |
R2‑1915173 | Resource Pool Configuration | LG Electronics Inc. | imported from 3GU |
R2‑1915174 | Considering valid PLMN being equivalent to the RPLMN in IDLE operations | Samsung | imported from 3GU |
R2‑1915175 | NR V2X System Information Aspects | LG Electronics Inc. | imported from 3GU |
R2‑1915176 | SLRB Configuration in NR V2X | LG Electronics Inc. | imported from 3GU |
R2‑1915177 | Remaining issue on detecting UL LBT Failures | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1915178 | Simultaneous Mode 1 and Mode 2 Configuration | LG Electronics Inc. | imported from 3GU |
R2‑1915179 | Impact of disabling HARQ on DRX | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1915180 | [Draft] Response LS on additional high layer information for sidelink physical layer operations | LG Electronics Inc. | imported from 3GU |
R2‑1915181 | Consideration on dormancy behavior | LG Electronics Inc. | imported from 3GU |
R2‑1915182 | Consideration on UE assistance information | LG Electronics Inc. | imported from 3GU |
R2‑1915183 | Remaining issues on PDCCH-WUS | LG Electronics Inc. | imported from 3GU |
R2‑1915184 | Temporary RS for fast SCell activation | LG Electronics Inc. | imported from 3GU |
R2‑1915185 | RLM for NR-U | Samsung | imported from 3GU |
R2‑1915186 | Discussion on SL radio link management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915187 | Mobility challenges for NR V2X platooning/groupcast | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915188 | Network Based Monitoring and Reporting of QoS parameters for NR V2X Sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915189 | Discussion on SSB measurement in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1915190 | Discussion on feeder link switch for transparent LEO | Huawei, HiSilicon | imported from 3GU |
R2‑1915191 | Discussion on mobility with steerable beams in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1915192 | Service continuity between TN and NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1915193 | On NR V2X Sidelink transmissions during Handover or Uu PHY layer problems | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915194 | Discussion on application of SLRB configuration during UE state transition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915195 | Discussion on the support of simultaneous mode 1 and mode 2 | Nokia Denmark | imported from 3GU |
R2‑1915196 | BAP mapping support for routing | CMCC | imported from 3GU |
R2‑1915197 | Details on determining consistent LBT failure of a BWP | CMCC | imported from 3GU |
R2‑1915198 | Further considerations on ephemeris data provision | CMCC | imported from 3GU |
R2‑1915199 | Impact analysis of NR CA frame timing relaxation | CMCC | imported from 3GU |
R2‑1915200 | Further consideration on PRACH prioritization | CMCC | imported from 3GU |
R2‑1915201 | Discussion on the flexible configuration of Maximum Data Rate Enumeration for UP Integrity Protection | CMCC, Huawei, Hisilicon | imported from 3GU |
R2‑1915202 | Mobility-state-based cell reselection in NR for HSDN | CMCC, MediaTek Inc | imported from 3GU |
R2‑1915203 | [107bis#86][NR L2 meas] running 38.314 | CMCC | imported from 3GU |
R2‑1915204 | Summary of open points on L2 Measurements | CMCC | imported from 3GU |
R2‑1915205 | Discussion and TP for Number of active UEs for CU/DU split scenario | CMCC | imported from 3GU |
R2‑1915206 | Discussion and TP for End-to-End RAN Part of Packet Delay Measurement | CMCC | imported from 3GU |
R2‑1915207 | Remaining Issues on Supporting M1 to M9 in L2 measurements | CMCC | imported from 3GU |
R2‑1915208 | UE capability for SON MDT WI | CMCC | imported from 3GU |
R2‑1915209 | TS 38.306 CR on UE capabilities for SON MDT WI | CMCC | imported from 3GU |
R2‑1915210 | Discussion on power saving for inter-frequency measurements | CMCC | imported from 3GU |
R2‑1915211 | Consideration of successful HO report | CMCC | imported from 3GU |
R2‑1915212 | Further discussion on handling of de-prioritized MAC PDU | CMCC | imported from 3GU |
R2‑1915213 | Further discussion on IE design of TimeReferenceInfo used for IIOT | CMCC | imported from 3GU |
R2‑1915214 | Further discussion of the details of reporting UE orientation sensor data | CMCC,Huawei | imported from 3GU |
R2‑1915215 | Discussion on the new RA-RNTI for MsgB | CMCC | imported from 3GU |
R2‑1915216 | Discussion on 2-step CFRA | CMCC | imported from 3GU |
R2‑1915217 | Discussion on the maximum number of configured CHO candidate cells | CMCC | imported from 3GU |
R2‑1915218 | Discussion on fast handover failure recovery | CMCC | imported from 3GU |
R2‑1915219 | Further consideration on EN-DC cell reselection | CMCC, Huawei, vivo, ZTE, OPPO, xiaomi | imported from 3GU |
R2‑1915220 | Discussion on support of NR RAN sharing | CMCC | imported from 3GU |
R2‑1915221 | Support of dynamic HARQ process ID sharing in NR-U | Samsung | imported from 3GU |
R2‑1915222 | Applicability of NR-U features to licensed carrier | Samsung | imported from 3GU |
R2‑1915223 | To reduce SCell activation delay in NR | Samsung | imported from 3GU |
R2‑1915224 | Support of unaligned frame boundary for inter-band TDD CA | Samsung | imported from 3GU |
R2‑1915225 | TA handling in 2-step RACH | Samsung | imported from 3GU |
R2‑1915226 | Local route selection in IAB | Sony | imported from 3GU |
R2‑1915227 | IAB System information handling | Sony | imported from 3GU |
R2‑1915228 | How to handle the deprioritized PDU for uplink Intra-UE prioritization | Sony | imported from 3GU |
R2‑1915229 | Consideration on activation/deactivation for CG Type 1 | Sony | imported from 3GU |
R2‑1915230 | Location report in NTN | Sony | imported from 3GU |
R2‑1915231 | Fallback to 4-step RACH with BI | Sony | imported from 3GU |
R2‑1915232 | Power Saving techniques, UE assistance information | SONY | imported from 3GU |
R2‑1915233 | UE power saving for inter frequency measurements | Sony | imported from 3GU |
R2‑1915234 | Details of Relaxed monitoring for NR UE power saving | Sony | imported from 3GU |
R2‑1915235 | UE-group wake-up signal for MTC/NB-IoT | Sony | imported from 3GU |
R2‑1915236 | Cell selection/reselection with NPN cells | Sony | imported from 3GU |
R2‑1915237 | Mobility enhancements for Connectivity to 5GC for MTC and NB-IoT | Sony | imported from 3GU |
R2‑1915238 | Discussion on differnt RAT dependent NR Positioning techniques | Sony | imported from 3GU |
R2‑1915239 | Applying un-used RNTIs for MsgB of 2-Step RACH | Sony | imported from 3GU |
R2‑1915240 | Differentiating MsgB with and without RRC messages | Sony | imported from 3GU |
R2‑1915241 | PUR L1 ACK and application layer response | Sony | imported from 3GU |
R2‑1915242 | RNTI ambiguity for CFRA and CBRA of 4-Step RACH | Sony | imported from 3GU |
R2‑1915243 | Expected signalling flows for SN-initiated PSCell change | NEC | imported from 3GU |
R2‑1915244 | Network configuration for fast MCG recovery | NEC | imported from 3GU |
R2‑1915245 | UE-assisted Activation/Deactivation for UL PDCP Duplication Enhancements | III | imported from 3GU |
R2‑1915246 | Transfer of segmented UECapabilityInformation by SRB2 | Samsung | imported from 3GU |
R2‑1915247 | MAC CE design for support of multiple beam indication for single PDCCH-based multiple TRPs | Samsung | imported from 3GU |
R2‑1915248 | Reduction of signaling and latency for beam managements | Samsung | imported from 3GU |
R2‑1915249 | Discussion on the additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1915250 | Additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1915251 | Additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1915252 | Change on transfer-type of handoverCommandMessage for NR SA handover | Samsung | imported from 3GU |
R2‑1915253 | Clarification regarding conditions of setting omitEN-DC for mrdc-Request | Samsung | imported from 3GU |
R2‑1915254 | MAC running CR for NR eMIMO | Samsung | imported from 3GU |
R2‑1915255 | Consideration on the variables for 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915256 | Running CR to 38.321 on Integrated Access and Backhaul for NR | Samsung Electronics GmbH | imported from 3GU |
R2‑1915257 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | Document Rapporteur (BlackBerry) | imported from 3GU |
R2‑1915258 | Way forward on pre-emptive BSR | Samsung, Lenovo, Nokia, Nokia Shanghai Bell, Huawei, Futurewei, LG, Sequans Communications, Intel, Kyocera | imported from 3GU |
R2‑1915259 | Summary of email discussion [107bis#47][NR TEI16] Overheating | Huawei, Huawei Device | imported from 3GU |
R2‑1915260 | 36.331 CR for addressing overheating issue in (NG)EN-DC | Huawei, Huawei Device | imported from 3GU |
R2‑1915261 | 38.331 CR for addressing overheating issue in (NG)EN-DC | Huawei, Huawei Device | imported from 3GU |
R2‑1915262 | On the enhancement of SRS carrier switching capability | Huawei, HiSilicon | imported from 3GU |
R2‑1915263 | Further discussion on the impact of PDCCH-WUS | Huawei, HiSilicon | imported from 3GU |
R2‑1915264 | Remaining issues on UE assistance information for power saving | Huawei, HiSilicon | imported from 3GU |
R2‑1915265 | Remaining issues on UE capability ID | Huawei, HiSilicon | imported from 3GU |
R2‑1915266 | Remaining issues on UE capability segmentation | Huawei, HiSilicon | imported from 3GU |
R2‑1915267 | Downlink hop-by-hop flow control | Samsung Electronics GmbH | imported from 3GU |
R2‑1915268 | Draft CR for 2-step CFRA | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915269 | On the need for bearer ID in the BAP header | Samsung Electronics GmbH | imported from 3GU |
R2‑1915270 | Discussion on NR SL lower layer procedures | Ericsson | imported from 3GU |
R2‑1915271 | Remaining issues on RLC AM and UM support in SL | Ericsson | imported from 3GU |
R2‑1915272 | Support of HARQ procedure over sidelink | Ericsson | imported from 3GU |
R2‑1915273 | Discussion on configured grant left issues | Ericsson | imported from 3GU |
R2‑1915274 | Discussion on SL link management | Ericsson | imported from 3GU |
R2‑1915275 | Discussion on NR SL QoS management | Ericsson | imported from 3GU |
R2‑1915276 | Discussion on PDCP left issues | Ericsson | imported from 3GU |
R2‑1915277 | Discussion on priority configuration | Ericsson | imported from 3GU |
R2‑1915278 | Upstream routing ID | Samsung Electronics GmbH | imported from 3GU |
R2‑1915279 | Running CR for 36.300 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1915280 | Running CR for 38.300 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1915281 | Running CR for 36.331 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1915282 | Running CR for 38.331 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1915283 | Idle measurement configuration in UE Inactive AS context | Ericsson | imported from 3GU |
R2‑1915284 | Remaining issues for early measurement results and configurations | Ericsson | imported from 3GU |
R2‑1915285 | Applicability of early measurement solutions for LTE | Ericsson | imported from 3GU |
R2‑1915286 | Delta configurations for early measurement configurations | Ericsson | imported from 3GU |
R2‑1915287 | Correction for P-Max in FR2 | Ericsson, NTT DOCOMO INC. | imported from 3GU |
R2‑1915288 | A second SSB periodicity in Idle and Inactive mode | Ericsson | imported from 3GU |
R2‑1915289 | cDRX enhancement for CA | Ericsson, Qualcomm Inc., Samsung, Verizon, Deutsche Telekom | imported from 3GU |
R2‑1915290 | Introduction of secondary DRX group | Ericsson | imported from 3GU |
R2‑1915291 | Introduction of secondary DRX group | Ericsson | imported from 3GU |
R2‑1915292 | Email report [107bis#49][NR TEI16] cDRX enhancement for CA | Ericsson | imported from 3GU |
R2‑1915293 | RAN2 impact of WUS in connected mode | Ericsson | imported from 3GU |
R2‑1915294 | UE Assistance Information for cDRX and SCell | Ericsson | imported from 3GU |
R2‑1915295 | UE Assistance Information for minimum K0 and K2 | Ericsson | imported from 3GU |
R2‑1915296 | RRM measurement relaxation | Ericsson | imported from 3GU |
R2‑1915297 | Stop using redirectedCarrierOffsetDedicated after reselection to another frequency | Huawei, HiSilicon | imported from 3GU |
R2‑1915298 | Introduction of additional enhancements for NB-IoT in TS 36.331 | Huawei | imported from 3GU |
R2‑1915299 | Introduction of additional enhancements for NB-IoT | Huawei | imported from 3GU |
R2‑1915300 | Discussion on SON ANR remaining open issues | Huawei, HiSilicon | imported from 3GU |
R2‑1915301 | Discussion on SON RACH and RLF remaining open issues | Huawei, HiSilicon | imported from 3GU |
R2‑1915302 | Introduction of UE specific DRX for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1915303 | Introduction of UE specific DRX for NB-IoT in 36.300 | Huawei | imported from 3GU |
R2‑1915304 | Introduction of UE specific DRX for NB-IoT in 36.304 | Huawei | imported from 3GU |
R2‑1915305 | Introduction of UE specific DRX for NB-IoT in 36.306 | Huawei | imported from 3GU |
R2‑1915306 | Introduction of UE specific DRX for NB-IoT in 36.331 | Huawei | imported from 3GU |
R2‑1915307 | Addressing Editor's Notes and FFSs in 36.300 running CR for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1915308 | Clarification on default configuration and SRB1 for UP-EDT | Huawei, HiSilicon | imported from 3GU |
R2‑1915309 | Discussion on remaining aspects of MT-EDT | Huawei, HiSilicon | imported from 3GU |
R2‑1915310 | Discussion on configuration for WUS grouping | Huawei, HiSilicon | imported from 3GU |
R2‑1915311 | FFSes on D-PUR | Huawei, HiSilicon | imported from 3GU |
R2‑1915312 | Handling of D-PUR configuration for CP solution | Huawei, HiSilicon | imported from 3GU |
R2‑1915313 | [Draft] LS on handling of D-PUR configuration for the CP solution | Huawei | imported from 3GU |
R2‑1915314 | Multiple TBs scheduling in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1915315 | Discussion on paging of RRC_INACTIVE for eMTC connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1915316 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1915317 | Report of email discussion [107bis#89][NB-IoT R16] Open issues on UAC in NB-IoT | Huawei | imported from 3GU |
R2‑1915318 | Support of RRC connection Re-establishment for the Control plane for NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1915319 | Discussion on SA2 reply LS on WUS assistance information | Huawei, HiSilicon | imported from 3GU |
R2‑1915320 | [Draft] Reply LS on WUS assistance information | Huawei | imported from 3GU |
R2‑1915321 | Details of hop-by-hop flow control | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915322 | Buffer status reporting for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915323 | eLCID space and handling of IAB specific MAC Ces | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915324 | Signalling for IAB timing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915325 | Signalling for radio aware scheduling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915326 | RNTI design for MsgB reception | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915327 | 2-step RACH only BWP | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915328 | HARQ ACK resources for successRAR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915329 | Draft LS on HARQ ACK resources for successRAR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915330 | CFRA for 2-step RACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915331 | Summary of email discussion [107bis#61][NR][eMIMO] | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915332 | Remaining details of SCell BFR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915333 | CFRA resource handling for BFR upon TAT expiry | Nokia, Nokia Shanghai Bell, Apple | imported from 3GU |
R2‑1915334 | New CG Confirmation MAC CE | Samsung | imported from 3GU |
R2‑1915335 | Configured Grant with Periodicity of any Integer Number of Slots | Samsung | imported from 3GU |
R2‑1915336 | MAC CE for RLC Activation and Deactivation | Samsung | imported from 3GU |
R2‑1915337 | Configuration of Multiple CG/SPS Configurations | Samsung | imported from 3GU |
R2‑1915338 | MAC Running CR for NR IIOT | Samsung | imported from 3GU |
R2‑1915339 | Initial Value of RX_DELIV | Samsung | imported from 3GU |
R2‑1915340 | Prioritization of SR Transmission for URLLC | Samsung | imported from 3GU |
R2‑1915341 | Reference Cell for Reference SFN | Samsung | imported from 3GU |
R2‑1915342 | Priority Value of an Uplink Grant | Samsung | imported from 3GU |
R2‑1915343 | Remaining issues with extending LCID space on the backhaul | Samsung Electronics GmbH | imported from 3GU |
R2‑1915344 | Considerations on control plane for DAPS | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1915345 | Further consideration on reply LSs from RAN1 and RAN4 | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1915346 | Discussion on handover preparation for DAPS | Huawei, HiSilicon | imported from 3GU |
R2‑1915347 | Discussion on PDCP duplication and reordering for DAPS HO | Huawei, HiSilicon | imported from 3GU |
R2‑1915348 | Discussion on UE capability sharing for DAPS | Huawei, HiSilicon | imported from 3GU |
R2‑1915349 | Clarification of DAPS handover support in 38.300 | Huawei, HiSilicon | imported from 3GU |
R2‑1915350 | Draft CR for 36.323 on supporting DAPS handover | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1915351 | Draft CR for 38.323 on supporting DAPS handover | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1915352 | Stop timer T310 in SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1915353 | (IPA) Handling of AS-Config in HandoverPreparationInformation | Ericsson | imported from 3GU |
R2‑1915354 | (IPA) Corrections on scg-RB-Config in CG-Config | Ericsson | imported from 3GU |
R2‑1915355 | Clarification on timer T304 for SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1915356 | Email discussion on remaining issues for correction on the condition of RBTermChange | Ericsson | imported from 3GU |
R2‑1915357 | Email discussion on security key derivation | Ericsson | imported from 3GU |
R2‑1915358 | Correction on security key derivation | Ericsson | imported from 3GU |
R2‑1915359 | Correction on security key derivation | Ericsson | imported from 3GU |
R2‑1915360 | Correction to power limitations in (NG)EN-DC | Ericsson, Qualcomm Incorporated, MediaTek Inc., Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915361 | (IPA) Correction of SRB3 handling at full configuration (Alt2) | Ericsson | imported from 3GU |
R2‑1915362 | (IPA) Correction to integrity protection in DRB addition and modification | Ericsson | imported from 3GU |
R2‑1915363 | Correction on MCG measurements in SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1915364 | Correction on SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1915365 | (IPA) Correction on sending Failure Information via SRB3 | Ericsson, ZTE Corporation (Rapporteur), Huawei | imported from 3GU |
R2‑1915366 | Correction on the condition of RBTermChange | Ericsson | imported from 3GU |
R2‑1915367 | (IPA) Correction to SIB5 acquisition for idle mode measurements | Ericsson | imported from 3GU |
R2‑1915368 | (IPA)Correction on inter-frequency neighbour cell measurements | Ericsson | imported from 3GU |
R2‑1915369 | Stop timer T313 in SCGFailureInformation for NE-DC | Ericsson | imported from 3GU |
R2‑1915370 | (IPA) Miscellaneous correction for late drop | Ericsson | imported from 3GU |
R2‑1915371 | Unaligned frame boundary with slot alignment and partial SFN alignment | Ericsson | imported from 3GU |
R2‑1915372 | NR-DC power control | Ericsson | imported from 3GU |
R2‑1915373 | Sending on-demand SIB(s) request over SRB3 | Ericsson | imported from 3GU |
R2‑1915374 | [107bis#07][NR R16] Running CR on 38.300 for on-demand SI procedure in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1915375 | [107bis#07][NR R16] Running CR on 38.331 for on-demand SI procedure in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1915376 | Draft Reply LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication | Ericsson | imported from 3GU |
R2‑1915377 | Inter-node resource coordination in NR SL | Ericsson | imported from 3GU |
R2‑1915378 | Discussion on SL Mode 2 left issues | Ericsson | imported from 3GU |
R2‑1915379 | Discussion on SL information reporting over Uu | Ericsson | imported from 3GU |
R2‑1915380 | Running CR for 38.322 for NR V2X | Ericsson | imported from 3GU |
R2‑1915381 | Discussion on SL AS configuration handling over NR Uu | Ericsson | imported from 3GU |
R2‑1915382 | Remaining issues on capability transfer in sidelink | Ericsson | imported from 3GU |
R2‑1915383 | Handling of SL in Uu RRC state transitions | Ericsson | imported from 3GU |
R2‑1915384 | Network and cell (re)selection in SNPN access mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915385 | RRC considerations to support SNPNs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915386 | Discussion on PCI list | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915387 | Report from Email Discussion [107bis#63] on SIB1 design | Nokia (Rapporteur) | imported from 3GU |
R2‑1915388 | Draft RRC CR for NPN | Nokia (Rapporteur) | imported from 3GU |
R2‑1915389 | Discussion on PLMN and Cell selection enhancements for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915390 | RLM/RLF measurement on NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915391 | Draft TS 38.340 (BAP) | Huawei | imported from 3GU |
R2‑1915392 | Even further views on NR V2X System Information | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915393 | Running CR on 36.321 for eMTC | Ericsson | imported from 3GU |
R2‑1915394 | Remaining issues in Msg4-based MT EDT | Ericsson | imported from 3GU |
R2‑1915395 | Scheduling enhancements for LTE-MTC and NB-IoT | Ericsson | imported from 3GU |
R2‑1915396 | MPDCCH performance improvement for LTE-M | Ericsson | imported from 3GU |
R2‑1915397 | Remaining issues for ETWS/CMAS notification delivery in connected mode for non-BL UEs | Ericsson | imported from 3GU |
R2‑1915398 | UE capabilities for enhancements for non-BL UEs | Ericsson | imported from 3GU |
R2‑1915399 | Reception type for ETWS/CMAS for non-BL UE in CE in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1915400 | S-Criterion interpretation for non-BL UEs | Ericsson | imported from 3GU |
R2‑1915401 | Cell Reselection improvement for LTE-M Standalone cells | Ericsson | imported from 3GU |
R2‑1915402 | Coexistence with NR for LTE-M | Ericsson | imported from 3GU |
R2‑1915403 | eDRX in RRC_INACTIVE for LTE-M | Ericsson | imported from 3GU |
R2‑1915404 | Running CR on 36.321 for NB-IoT | Ericsson | imported from 3GU |
R2‑1915405 | PUR periodicity and UE multiplexing | Ericsson | imported from 3GU |
R2‑1915406 | PUR with DCI scheduling | Ericsson | imported from 3GU |
R2‑1915407 | PUR - Remaining open issues | Ericsson | imported from 3GU |
R2‑1915408 | On the need for PUR L1 ACK application layer response | Ericsson | imported from 3GU |
R2‑1915409 | Draft LS reply PUR transmission for NB-IoT/eMTC | Ericsson | imported from 3GU |
R2‑1915410 | Coexistence with NR for NB-IoT | Ericsson | imported from 3GU |
R2‑1915411 | Discussion on remaining issues of Immediate MDT | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915412 | Discussion on remaining issues of Logged MDT | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915413 | Immediate MDT continuity upon handover procedure | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915414 | Restriction on MDT measurement and report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915415 | Clarification on out-of-coverage measurement and report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915416 | Clarification on connected UE counting in CA | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915417 | Further consideration on INACTIVE UE counting | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915418 | Discussion on PRB usage of a cell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915419 | Further considerations on RACH optimization | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915420 | Discussion on RLF report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915421 | Enhancement on Msg1 based SI request | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915422 | Consideration on SR and DRX in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915423 | On SSB-ToMeasure clarifications | Ericsson | imported from 3GU |
R2‑1915424 | CR to 38.331 on SSB-ToMeasure clarifications | Ericsson | imported from 3GU |
R2‑1915425 | CR to 36.331 on SSB-ToMeasure clarifications | Ericsson | imported from 3GU |
R2‑1915426 | CR to 36.331 on performing L3 filtering for NR related measurements | Ericsson | imported from 3GU |
R2‑1915427 | CR to 38.331 on A2 event definition clarification | Ericsson | imported from 3GU |
R2‑1915428 | CR to 36.331 on A2 event definition clarification | Ericsson | imported from 3GU |
R2‑1915429 | Triggering conditions for A1-A6 events in NR | Ericsson | imported from 3GU |
R2‑1915430 | CR to 38.331 on Triggering conditions for A1 to A6 events in NR | Ericsson | imported from 3GU |
R2‑1915431 | CR to 38.306 on Triggering conditions for A1 to A6 events in NR | Ericsson | imported from 3GU |
R2‑1915432 | Open issues of L2 measurements in NR | Ericsson | imported from 3GU |
R2‑1915433 | Open issues related to RACH report | Ericsson | imported from 3GU |
R2‑1915434 | Open issues related to RLF report | Ericsson | imported from 3GU |
R2‑1915435 | Successful handover report in NR | Ericsson | imported from 3GU |
R2‑1915436 | Open issues of CEF report | Ericsson | imported from 3GU |
R2‑1915437 | 107bis#87 email discussion report on running CR for SON | Ericsson | imported from 3GU |
R2‑1915438 | Running CR to 38.331 on NR SON | Ericsson | imported from 3GU |
R2‑1915439 | Discussion on QoS flow in SLRB | Apple | imported from 3GU |
R2‑1915440 | Disucssion on PC5 RRC left issues | Apple | imported from 3GU |
R2‑1915441 | Draft LS on keep alive function | Apple | imported from 3GU |
R2‑1915442 | UL-SL Prioritization under SL incapable RAN | Apple | imported from 3GU |
R2‑1915443 | SL Synchronization under Async gNB(s) | Apple | imported from 3GU |
R2‑1915444 | Maximum Data Rate Enumeration for UP Integrity Protection | Apple, ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915445 | Draft LS on Maximum Data Rate Enumeration for UP Integrity Protection | Apple | imported from 3GU |
R2‑1915446 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | Apple | imported from 3GU |
R2‑1915447 | CR to TS38.331 on FR2 intra band contiguous and non-contiguous CA fallback | Apple | imported from 3GU |
R2‑1915448 | CR to TS38.306 on FR2 intra band contiguous and non-contiguous CA fallback | Apple | imported from 3GU |
R2‑1915449 | Introduction to additional enhancements NB-IoT Rel-16 | BlackBerry UK Limited | imported from 3GU |
R2‑1915450 | Loading Control in the RACH Type Selection | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1915451 | Remaining issues on the PDCP anchor relocation for DPAS based handover | NEC | imported from 3GU |
R2‑1915452 | DL PDCP handling for RLC UM | NEC | imported from 3GU |
R2‑1915453 | Further consideration on capability coordination for DAPS based handover | NEC | imported from 3GU |
R2‑1915454 | RLF report for CHO | NEC | imported from 3GU |
R2‑1915455 | Combination of CHO and DAPS | NEC | imported from 3GU |
R2‑1915456 | Remaining issues for routing | Huawei, HiSilicon | imported from 3GU |
R2‑1915457 | Remaining issues for bearer mapping | Huawei, HiSilicon | imported from 3GU |
R2‑1915458 | Flow control for IAB networks | Huawei, HiSilicon | imported from 3GU |
R2‑1915459 | Way forward and TP for the pre-BSR | Huawei, HiSilicon | imported from 3GU |
R2‑1915460 | RACH related issues for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1915461 | Backhaul RLF Recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1915462 | Discussion on F1AP over LTE in NSA | Huawei, HiSilicon | imported from 3GU |
R2‑1915463 | Running CR to 36.331 on Integrated Access and Backhaul for NR of NSA | Huawei, HiSilicon | imported from 3GU |
R2‑1915464 | TP for TS 38.304 and 36.304 on the impacts of idle procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1915465 | T_delta of IAB DL transmission timing alignment | Huawei, HiSilicon | imported from 3GU |
R2‑1915466 | Discussion on the BAP PDU format | Huawei, HiSilicon | imported from 3GU |
R2‑1915467 | Support of UE PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1915468 | Draft CR to 36.331 on Integrated Access and Backhaul for (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1915469 | Running CR to TS 38.331 on IAB for NR | Ericsson | imported from 3GU |
R2‑1915470 | Draft CR to TS 38.331 on IAB for TDD UL DL Change of Configuration | Ericsson | imported from 3GU |
R2‑1915471 | On Multi-connectivity for IAB | Ericsson | imported from 3GU |
R2‑1915472 | Backhaul Adaptation Protocol (BAP) Header for IAB Networks | Ericsson | imported from 3GU |
R2‑1915473 | Further Discussion on BAP Layer Signaling | Ericsson | imported from 3GU |
R2‑1915474 | Remaining Issues Related to Flow Control | Ericsson | imported from 3GU |
R2‑1915475 | Way forward on pre-emptive BSR in IAB networks | Ericsson, Sony | imported from 3GU |
R2‑1915476 | IP Address Assignment for IAB Nodes | Ericsson | imported from 3GU |
R2‑1915477 | Further details on Backhaul link RLF Notification Types to Downstream Node(s) | Ericsson, Song | imported from 3GU |
R2‑1915478 | Summary for Email Discussion [107bis#40] [IAB] SI Broadast, barring, Initial access, Connection setup (Ericsson) | Ericsson | imported from 3GU |
R2‑1915479 | Cell reservations, UAC, and initial access aspects in IAB networks | Ericsson | imported from 3GU |
R2‑1915480 | RRC Connection Re-establishment cause values for IAB nodes | Ericsson | imported from 3GU |
R2‑1915481 | Security for inter-IAB node Signalling | Ericsson | imported from 3GU |
R2‑1915482 | Correction on the Msg3 based on demand system information | Huawei, HiSilicon | imported from 3GU |
R2‑1915483 | Correction on the configuration of split SRB | Huawei, HiSilicon, Samsung | imported from 3GU |
R2‑1915484 | Correction for random access initiation due to reconfiguration with sync | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1915485 | Enhancement on BSR format for the one LCG case | Huawei, HiSilicon | imported from 3GU |
R2‑1915486 | Correction on header compression, integrity protection and ciphering | Huawei, HiSilicon | imported from 3GU |
R2‑1915487 | Correction on initial BWP bandwidth capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑1915488 | Correction on camping conditions | Huawei, HiSilicon | imported from 3GU |
R2‑1915489 | Correction on CORESET location | Huawei, HiSilicon | imported from 3GU |
R2‑1915490 | On Autonomous Transmission of Pending MAC PDUs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915491 | Intra-UE Prioritization with Per-Grant Priority Indication: MAC Perspectives | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915492 | Intra-UE Prioritization between SR and PUSCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915493 | Network Coordination for Uplink PDCP Duplication | Nokia, Nokia Shanghai Bell, LG Electronics, III, Spreadtrum, NTT Docomo, Fujitsu, Mediatek, CATT, Samsung, Asia Pacific Telecom | imported from 3GU |
R2‑1915494 | [Draft] LS on Network Coordination for UL PDCP Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915495 | Configuration and Control for Uplink PDCP Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915496 | On per-DRB DAPS Handover in NR and LTE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915497 | On RLF reporting for CHO and DAPS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915498 | On when to decode and non-compliance with target cell configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915499 | Failure Handling via CHO recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915500 | DraftCR for early RLF and fast handover failure recovery for PSCell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915501 | Remaining details of DAPS failure handling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915502 | DraftCR for introducing the fallback to source cell in DAPS handover failure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915503 | On what is still possible for SL RLF detection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915504 | Missing reportAddNeighMeas in periodic measurement reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915505 | SMTC setting in MR-DC PSCell change | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915506 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915507 | Report for [107bis#36] [NR R15] FR2 CA Fallbacks (Nokia) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915508 | Report for [107bis#35] [NR R15] Consequences if not supported (Nokia) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915509 | On the capability coordination of measurement reporting criteria for MR-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915510 | Clarifying the interpretation behind the encapsulation of the filter extensions (Nokia) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915511 | On the modelling of dormant SCG | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915512 | [DRAFT] Response LS on SL RLM_RLF | LG Electronics Inc. | imported from 3GU |
R2‑1915513 | Discussion on assistance information for resource allocation in NR SL | LG Electronics Inc. | imported from 3GU |
R2‑1915514 | Remaining issues on SL RLF reporting | LG Electronics Inc. | imported from 3GU |
R2‑1915515 | Remaining issues on SL RLM | LG Electronics Inc. | imported from 3GU |
R2‑1915516 | Discussion on groupcast HARQ in NR SL | LG Electronics Inc. | imported from 3GU |
R2‑1915517 | Discussion on measurement and report in NR SL | LG Electronics Inc. | imported from 3GU |
R2‑1915518 | Discussion on remaining issues of mode1 operation | LG Electronics Inc. | imported from 3GU |
R2‑1915519 | CAPAC for UL configured grant with SRB data | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915520 | Further details on PDCCH WUS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915521 | Dedicated RRM Measurement Relaxation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915522 | Further details on RRM measurement relaxation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915523 | On UE assistance | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915524 | (IPA) Correction on inter-frequency neighbour cell measurements | Ericsson | imported from 3GU |
R2‑1915525 | Correction to Pcompensation for FR2 | Huawei, HiSilicon | imported from 3GU |
R2‑1915526 | Correction to nonCriticalExtension of RRCConnectionRelease | Huawei, HiSilicon | imported from 3GU |
R2‑1915527 | Report of email discussion [107bis#71][PowerSaving] 38.321 running CR | Huawei, HiSilicon | imported from 3GU |
R2‑1915528 | Running CR for Introduction of Rel-16 NR UE power saving in TS 38.321 | Huawei, HiSilicon | imported from 3GU |
R2‑1915529 | On SrxlevRef adaptation in relaxed monitoring | Huawei, HiSilicon | imported from 3GU |
R2‑1915530 | Reducing the number of neighbour cells/carriers to measure | Huawei, HiSilicon | imported from 3GU |
R2‑1915531 | Remaining issues of DL quality report | Huawei, HiSilicon | imported from 3GU |
R2‑1915532 | DRAFT LS on channel quality report for LTE-MTC | Huawei, HiSilicon | imported from 3GU |
R2‑1915533 | MPDCCH performance improvement using CRS | Huawei, HiSilicon | imported from 3GU |
R2‑1915534 | ETWS/CMAS in connected mode | Huawei, HiSilicon | imported from 3GU |
R2‑1915535 | DRAFT LS to RAN1 on the use of SI-RNTI for the ETWS/CMAS notification | Huawei, HiSilicon | imported from 3GU |
R2‑1915536 | Enhancements to idle mode mobility for non-BL UEs | Huawei, HiSilicon | imported from 3GU |
R2‑1915537 | Use of RSS for measurement improvements | Huawei, HiSilicon | imported from 3GU |
R2‑1915538 | Way forward on pre-emptive BSR | Samsung, Lenovo, Nokia, Nokia Shanghai Bell, Huawei, Futurewei, LG, Sequans Communications, Intel, Kyocera, Qualcomm | imported from 3GU |
R2‑1915539 | Considerations on the RRM measurement relaxation | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1915540 | SI update notification and PWS notification in WUS | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1915541 | Measurement reporting while CHO is configured | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1915542 | CA duplication using NR PDCP in EN-DC | Ericsson | imported from 3GU |
R2‑1915543 | System Information in NTN | Nomor Research GmbH | imported from 3GU |
R2‑1915544 | Remaining issues on consistent LBT failures | MediaTek Inc. | imported from 3GU |
R2‑1915545 | Indicating SFN LSB in the payload of Msg2 or MsgB | MediaTek Inc. | imported from 3GU |
R2‑1915546 | Ethernet Header Compression Message Format | MediaTek Inc. | imported from 3GU |
R2‑1915547 | Propagation Delay Compensation by the gNB | MediaTek Inc. | imported from 3GU |
R2‑1915548 | Running CR for 38.331 for Power Savings | MediaTek Inc. | imported from 3GU |
R2‑1915549 | Open issues related to the running 38.331 CR | MediaTek Inc. | imported from 3GU |
R2‑1915550 | Periodic CSI and SRS with wake-up indication | MediaTek Inc. | imported from 3GU |
R2‑1915551 | On T312 in NR and its relationship with T310 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915552 | Resource Pool Sharing between Mode 1 and Mode 2 UEs | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1915553 | Further D-PUR configuration aspects | Gemalto N.V. | imported from 3GU |
R2‑1915554 | PC5-RRC Procedures for NR V2X | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1915555 | Resource Allocation for Mode 2 NR V2X | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1915556 | UE capabilities for CHO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915557 | UE capabilities for DAPS handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915558 | Stage 2 for Multi-RTT positioning | Qualcomm Incorporated | imported from 3GU |
R2‑1915559 | Reconfiguration failure in NE-DC | Google Inc. | imported from 3GU |
R2‑1915560 | Running LPP CR for PPP-RTK support (SSR) | Qualcomm Incorporated | imported from 3GU |
R2‑1915561 | Running LTE RRC CR for PPP-RTK support (SSR) | Qualcomm Incorporated | imported from 3GU |
R2‑1915562 | Remaining details on broadcast assistance data delivery | Qualcomm Incorporated | imported from 3GU |
R2‑1915563 | Assistance Data for DL-only UE-based mode | Qualcomm Incorporated | imported from 3GU |
R2‑1915564 | Details of pre-emptive BSR design | Samsung Electronics GmbH | imported from 3GU |
R2‑1915565 | Further details on uplink enhancements for NTN | Ericsson | imported from 3GU |
R2‑1915566 | DRX adaptions for NTN | Ericsson, Nomor Research GmbH, THALES | imported from 3GU |
R2‑1915567 | Remaining details on Random access for NTN | Ericsson | imported from 3GU |
R2‑1915568 | On RACH less for NTN | Ericsson | imported from 3GU |
R2‑1915569 | Correction to full configuration | Google Inc. | imported from 3GU |
R2‑1915570 | Summary of E-mail discusion [107bis#33][NR R15] Exchanging used IDs of SN terminated DRBs | Huawei, HiSilicon | imported from 3GU |
R2‑1915571 | LS on exchanging used IDs of SN terminated DRBs | Huawei, HiSilicon | imported from 3GU |
R2‑1915572 | Draft CR on not up-to-date SN terminated RB configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1915573 | Clarification on PDCP version change | Huawei, HiSilicon | imported from 3GU |
R2‑1915574 | Clarification on PDCP version change | Huawei, HiSilicon | imported from 3GU |
R2‑1915575 | Correction to DRB addition/modification for the LTE UE not in EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915576 | Clarification on sending of sk-counter for (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915577 | Correction to key derivation for the UE configured with sk-counter | Huawei, HiSilicon | imported from 3GU |
R2‑1915578 | Correction on the need for reconfiguration with sync in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915579 | Correction on the pre-condition for reconfiguration with sync of SCG | Huawei, HiSilicon | imported from 3GU |
R2‑1915580 | Correction on the SCG RRCReconfigurationComplete for NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915581 | Correction on AS-Context | Huawei, HiSilicon | imported from 3GU |
R2‑1915582 | Correction on AS-Config | Huawei, HiSilicon | imported from 3GU |
R2‑1915583 | Addition of servCellIndexRangeSCG in AS-Context in 36331 | Huawei, HiSilicon | imported from 3GU |
R2‑1915584 | Addition of servCellIndexRangeSCG in AS-Context in 38331 | Huawei, HiSilicon | imported from 3GU |
R2‑1915585 | Clarification on the (NG)EN-DC capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑1915586 | Clarification on the en-DC and ng-EN-DC capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑1915587 | Clarification on ne-DC capability | Huawei, HiSilicon | imported from 3GU |
R2‑1915588 | PDCP configuration generation (email discussion of 107#25) | Huawei, HiSilicon | imported from 3GU |
R2‑1915589 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915590 | Correction on measurement reporting in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915591 | PUCCH configuration for MR-DC and NR standalone | Huawei, HiSilicon | imported from 3GU |
R2‑1915592 | Correction on PUCCH configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1915593 | Draft LS to RAN1 for clarification of PUCCH configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1915594 | Correction on SIB1 description | Huawei, HiSilicon | imported from 3GU |
R2‑1915595 | Enhancement of RRC_INACTIVE | Google Inc. | imported from 3GU |
R2‑1915596 | Consideration of preemptive BSR in IAB | Kyocera | imported from 3GU |
R2‑1915597 | Further discussion on-demand SI for RRC_CONNECTED UE | Huawei, HiSilicon | imported from 3GU |
R2‑1915598 | Possible issues on Backhaul RLF handling | Kyocera | imported from 3GU |
R2‑1915599 | Hand-over rate in Earth fixed vs. Earth moving cells in NTN LEO | THALES | imported from 3GU |
R2‑1915600 | Recovery due to LBT failures | Kyocera | imported from 3GU |
R2‑1915601 | PC5 L2/L3 protocols for unicast and groupcast | Kyocera | imported from 3GU |
R2‑1915602 | RA type switch and fallback in 2-step RA | Ericsson | imported from 3GU |
R2‑1915603 | New msgB format for 2-step RA | Ericsson | imported from 3GU |
R2‑1915604 | Preamble group handling for 2-step RA | Ericsson | imported from 3GU |
R2‑1915605 | CFRA in 2-step RA | Ericsson | imported from 3GU |
R2‑1915606 | Beam-specific 2-step RA support | Ericsson | imported from 3GU |
R2‑1915607 | msgB RNTI design for 2-step RA | Ericsson | imported from 3GU |
R2‑1915608 | Introduction of additional enhancements for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1915609 | Introduction of additional enhancements for eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1915610 | Proposals for WUS group open issues | Qualcomm Incorporated | imported from 3GU |
R2‑1915611 | Proposal for 2-bit downlink channel quality reporting in MSG3 for eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1915612 | LTE-M indication discussion paper | Qualcomm Incorporated | imported from 3GU |
R2‑1915613 | RNTI for ETWS/CMAS indication in connected mode for non-BL UEs | Qualcomm Incorporated | imported from 3GU |
R2‑1915614 | [DRAFT] Reply LS on assistance indication for WUS | Qualcomm Incorporated | imported from 3GU |
R2‑1915615 | Remaining issues for EHC in TSC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915616 | UE behaviour on Logged MDT configuration events | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915617 | Avoiding conflicting MDT configurations in DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915618 | Impact of SNPN on PLMN check for MDT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915619 | RACH report and its reporting procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915620 | Scheduled IP Throughput configuration for NR MDT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915621 | Beam measurements linked to successful and failed handovers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915622 | Measurement event for interference-forced inter-RAT/inter-freq HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915623 | QoE measurements collection support in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915624 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915625 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915626 | Miscellaneous non-controversial corrections Set IV | Ericsson | imported from 3GU |
R2‑1915627 | Presence and absence of TAC in NR cell | Ericsson | imported from 3GU |
R2‑1915628 | Definition of NR standalone | Ericsson | imported from 3GU |
R2‑1915629 | Clarification on sCellIndex and SCell lists | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R2‑1915630 | Correction to channelBWs | Ericsson | imported from 3GU |
R2‑1915631 | Rel-16 RRC planning | Ericsson | imported from 3GU |
R2‑1915632 | Clarification of submission of RRCReconfigurationcomplete | Ericsson | imported from 3GU |
R2‑1915633 | Correction to early measurement reporting results | Ericsson | imported from 3GU |
R2‑1915634 | Correction to maximum number of carriers for idle mode measurements | Ericsson | imported from 3GU |
R2‑1915635 | Correction on reestablishRLC and reestablishPDCP | Ericsson | imported from 3GU |
R2‑1915636 | Ambiguities in channel bandwidth capabilities | Ericsson | imported from 3GU |
R2‑1915637 | Full configuration in inter-RAT handover | Google Inc. | imported from 3GU |
R2‑1915638 | Formula for mapping UE to WUS group | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915639 | Configuration details for WUS grouping | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915640 | Unresolved issues for BFR on SCell | Ericsson | imported from 3GU |
R2‑1915641 | BFR MAC CE for SpCell | Ericsson | imported from 3GU |
R2‑1915642 | Addition of indication for successful Random access procedure | Ericsson | imported from 3GU |
R2‑1915643 | New BSR trigger for EN-DC | Ericsson | imported from 3GU |
R2‑1915644 | Introduction of Additional SRS | Ericsson | imported from 3GU |
R2‑1915645 | Draft LS on S-KgNB/KSN Derivation in Conditional PSCell Addition/Change | Futurewei | imported from 3GU |
R2‑1915646 | Use case and Signaling for RSS | Ericsson | imported from 3GU |
R2‑1915647 | New SIB for hosting posSI Scheduling Information | Ericsson | imported from 3GU |
R2‑1915648 | Quality Report in eMTC Remaining Issues | Ericsson | imported from 3GU |
R2‑1915649 | RSS Signalling Configuration | Ericsson | imported from 3GU |
R2‑1915650 | Remaining Issues for ANR measurements | Ericsson | imported from 3GU |
R2‑1915651 | Additional path reporting for downlink NR positioning measurements | Ericsson, T-Mobile, Nokia, Nokia Shanghai Bell, Deutsche Telekom | imported from 3GU |
R2‑1915652 | LPP, RRC and UE Rx-Tx Aspects of NR RAT dependent positioning | Ericsson | imported from 3GU |
R2‑1915653 | Corrections of terminology for stage 2 | Ericsson | imported from 3GU |
R2‑1915654 | GNSS Integer Ambiguity Level Indications | Ericsson, Swift Navigation,ESA | imported from 3GU |
R2‑1915655 | Corrections for Positioning Architecture | Ericsson | imported from 3GU |
R2‑1915656 | On Demand Delivery of Positioning Assistance Data | Ericsson | imported from 3GU |
R2‑1915657 | Specify UDC Header is part of Data Field | Ericsson, Samsung, Nokia, Nokia Shanghai Bell, Huawei, HiSilicon, CATT | imported from 3GU |
R2‑1915658 | UE-based configuration options | Ericsson | imported from 3GU |
R2‑1915659 | System support for NB-IoT Paging across Multiple Carriers | VODAFONE Group Plc | imported from 3GU |
R2‑1915660 | Miscellaneous non-controversial corrections Set IV | Ericsson | imported from 3GU |
R2‑1915661 | Presence and absence of TAC in NR cell | Ericsson | imported from 3GU |
R2‑1915662 | Definition of NR standalone | Ericsson | imported from 3GU |
R2‑1915663 | Clarification on sCellIndex and SCell lists | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R2‑1915664 | Correction to channelBWs | Ericsson | imported from 3GU |
R2‑1915665 | Rel-16 RRC planning | Ericsson | imported from 3GU |
R2‑1915666 | Clarification of submission of RRCReconfigurationcomplete | Ericsson | imported from 3GU |
R2‑1915667 | Correction to early measurement reporting results | Ericsson | imported from 3GU |
R2‑1915668 | Correction to maximum number of carriers for idle mode measurements | Ericsson | imported from 3GU |
R2‑1915669 | Correction on reestablishRLC and reestablishPDCP | Ericsson | imported from 3GU |
R2‑1915670 | Ambiguities in channel bandwidth capabilities | Ericsson | imported from 3GU |
R2‑1915671 | Miscellaneous non-controversial corrections Set IV | Ericsson | imported from 3GU |
R2‑1915672 | Presence and absence of TAC in NR cell | Ericsson | imported from 3GU |
R2‑1915673 | Definition of NR standalone | Ericsson | imported from 3GU |
R2‑1915674 | CR to 36.306 - On explicit NR FR1 related CGI reporting capability indication | Ericsson | imported from 3GU |
R2‑1915675 | CR to 36.331 - On explicit NR FR1 related CGI reporting capability indication | Ericsson | imported from 3GU |
R2‑1915676 | CR to 38.306 - On NR CGI reporting related issues | Ericsson | imported from 3GU |
R2‑1915677 | CR to 38.331 - On NR CGI reporting related issues | Ericsson | imported from 3GU |
R2‑1915678 | System support for NB-IoT Paging across Multiple Carriers | VODAFONE Group Plc | imported from 3GU |
R2‑1915679 | Network control for non-BL UE in BR mode | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1915680 | Introducing multiple BC-FS | Ericsson | imported from 3GU |
R2‑1915681 | Returning multiple BC+FS in CG-Config | Ericsson | imported from 3GU |
R2‑1915682 | Correction to Feature Set Combination and Band combination list for NR-DC (38.331) | Ericsson | imported from 3GU |
R2‑1915683 | Security requirements for split PDU session (38.331) | Ericsson, Qualcomm | imported from 3GU |
R2‑1915684 | Use of splitSRB-WithOneUL-Path capability (38.306) | Ericsson | imported from 3GU |
R2‑1915685 | Use of splitSRB-WithOneUL-Path capability (38.331) | Ericsson | imported from 3GU |
R2‑1915686 | Use of splitSRB-WithOneUL-Path capability | Ericsson | imported from 3GU |
R2‑1915687 | Open issues for supended SCG behaviour | Ericsson | imported from 3GU |
R2‑1915688 | Configuration of dormancy behaviour in SCell | Ericsson | imported from 3GU |
R2‑1915689 | Correction to pdsch-RepetitionMultiSlots and pusch-RepetitionMultiSlots | Ericsson | imported from 3GU |
R2‑1915690 | Running CR for the introduction of NR positioning | Ericsson | imported from 3GU |
R2‑1915691 | Remaining issues for accurate reference time delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915692 | CG/SPS alignment with TSN periodicity | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915693 | Further discussion on CG periodicities and CG and SPS occasions determination for new periodicities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915694 | SPS collisions with multiple SPS configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915695 | Padding removal | Nokia, Nokia Shanghai Bell, vivo, OPPO, Mediatek, Samsung, Sony, Intel, ZTE | imported from 3GU |
R2‑1915696 | Joint IP and Ethernet Header compression | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915697 | Ethernet Header compression profiles | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915698 | Further details of feedback mechanism | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915699 | Route priority and local routing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915700 | BH link failure handling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915701 | Remaining issues of routing and bearer mapping configuration in IAB nodes for UP traffic | Nokia, Nokia Shanghai Bell, Ericsson, KDDI | imported from 3GU |
R2‑1915702 | Remaining issues of routing and bearer mapping configuration in IAB nodes for CP traffic | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915703 | RAN2 aspects of F1AP over LTE signalling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915704 | [DRAFT] LS on F1AP over LTE leg signalling for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915705 | Routing ID design for uplink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915706 | Remaining issues regarding UE assistance information | Samsung Telecommunications | imported from 3GU |
R2‑1915707 | Correction of UE assistance information | Samsung Telecommunications | imported from 3GU |
R2‑1915708 | Correction of UE assistance information | Samsung Telecommunications | imported from 3GU |
R2‑1915709 | Clarification regarding QoS handling in MRDC with 5G CN | Samsung Telecommunications | imported from 3GU |
R2‑1915710 | Clarification regarding inter-node transfer of UE capability containers | Samsung Telecommunications | imported from 3GU |
R2‑1915711 | Adding comment to avoid improper extension of per BC capabilities for MRDC | Samsung Telecommunications | imported from 3GU |
R2‑1915712 | Recommended Bit Rate/Query for FLUS and MTSI | Qualcomm Incorporated | imported from 3GU |
R2‑1915713 | [Draft] Reply LS on Recommended Bit Rate/Query for FLUS and MTSI | Qualcomm Incorporated | imported from 3GU |
R2‑1915714 | Too strong interference during CLI-RSSI measurement | Qualcomm Incorporated | imported from 3GU |
R2‑1915715 | Report of [107bis#58]CLI measurements UE capabilities | Qualcomm Incorporated | imported from 3GU |
R2‑1915716 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) | Qualcomm Incorporated | imported from 3GU |
R2‑1915717 | Introduction of Rel-16 eMTC enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑1915718 | Discussion on reply LS from SA2 on MT-EDT | Qualcomm Incorporated | imported from 3GU |
R2‑1915719 | [DRAFT] Reply LS on Mobile-terminated Early Data Transmission | Qualcomm Incorporated | imported from 3GU |
R2‑1915720 | MT-EDT related Editor's Notes and FFSes in RRC running CR | Qualcomm Incorporated | imported from 3GU |
R2‑1915721 | PUR related Editor's Notes and FFSes in RRC running CR | Qualcomm Incorporated | imported from 3GU |
R2‑1915722 | Correction to field conditions in NE-DC | Ericsson | imported from 3GU |
R2‑1915723 | Hop-by-Hop Flow control for IAB | Futurewei Technologies | imported from 3GU |
R2‑1915724 | SLRB configuration during UE state transition | Intel Corporation | imported from 3GU |
R2‑1915725 | Support of non-standardized PQI in NR V2X | Intel Corporation | imported from 3GU |
R2‑1915726 | Remaining aspects for SL RLC | Intel Corporation | imported from 3GU |
R2‑1915727 | On the support of simultaneous configuration of mode1 and mode2 | Intel Corporation | imported from 3GU |
R2‑1915728 | Remaining aspects for SL PDCP | Intel Corporation | imported from 3GU |
R2‑1915729 | UE capabilities for features specified in R16 PWS WI | Intel Corporation | imported from 3GU |
R2‑1915730 | Remaining issues for early measurements upon UE mobility | Samsung Telecommunications | imported from 3GU |
R2‑1915731 | Resumption based on early measurement results | Samsung Telecommunications | imported from 3GU |
R2‑1915732 | Immediate MDT, inter-node aspects | Samsung Telecommunications | imported from 3GU |
R2‑1915733 | Logged MDT, inter-node aspects (SN configuration) | Samsung Telecommunications | imported from 3GU |
R2‑1915734 | MDT for early measurments (Logged, immediate) | Samsung Telecommunications | imported from 3GU |
R2‑1915735 | Review of UE information in NR, alignment and harmonisation | Samsung Telecommunications | imported from 3GU |
R2‑1915736 | CHO configuration/ execution, remaining aspects | Samsung Telecommunications | imported from 3GU |
R2‑1915737 | Main issues remaining for SN initiated SN change | Samsung Telecommunications | imported from 3GU |
R2‑1915738 | Capability coordination for DAPS, required UE capability details and signalling | Samsung Telecommunications | imported from 3GU |
R2‑1915739 | Further considerations on mobility for CAG | Intel Corporation | imported from 3GU |
R2‑1915740 | Configured grant confirmation MAC CE | Intel Corporation | imported from 3GU |
R2‑1915741 | TSC assistance information | Intel Corporation | imported from 3GU |
R2‑1915742 | Intra UE prioritization of UL Data and Data | Intel Corporation | imported from 3GU |
R2‑1915743 | RRC Connection establishment/resumption in SNPN and CAG | Intel Corporation | imported from 3GU |
R2‑1915744 | Benefits of inter-IAB node metric exchange for IAB scheduling | AT&T | imported from 3GU |
R2‑1915745 | Remaining details of F1AP over LTE | AT&T, KDDI, LG, ZTE, Verizon, KT | imported from 3GU |
R2‑1915746 | CR to 36.331 for F1AP over LTE | AT&T, KDDI, LG, ZTE, Verizon, KT | imported from 3GU |
R2‑1915747 | CR to 38.331 for F1AP over LTE | AT&T, KDDI, LG, ZTE, Verizon, KT | imported from 3GU |
R2‑1915748 | UL BAP address and BAP path ID lengths | AT&T | imported from 3GU |
R2‑1915749 | Control of pre-emptive SR/BSR functionality for low-latency scheduling | AT&T | imported from 3GU |
R2‑1915750 | Consideration of IAB features that may potentially require security enhancements | AT&T | imported from 3GU |
R2‑1915751 | Further Pre-configured UL Resources Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R2‑1915752 | Report on Email discussion [107bis#84][NR MDT] MR DC related issue (Ericsson) | Ericsson | imported from 3GU |
R2‑1915753 | Mobility history information reporting from the UE | Ericsson | imported from 3GU |
R2‑1915754 | Logged MDT Configuration & Reporting handling in DC scenarios | Ericsson | imported from 3GU |
R2‑1915755 | Leftover issues for Logged MDT in NR | Ericsson | imported from 3GU |
R2‑1915756 | CR on introducing UE capability for MDT in NR | Ericsson | imported from 3GU |
R2‑1915757 | UE Location Report capability indication for MDT | Ericsson | imported from 3GU |
R2‑1915758 | Maximum processing time for RRC Segmentation | Ericsson | imported from 3GU |
R2‑1915759 | Remaining aspects on Capability ID | Ericsson | imported from 3GU |
R2‑1915760 | Introduction of RRC Segmentation - Downlink | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | imported from 3GU |
R2‑1915761 | Introduction of RRC Segmentation - Downlink | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | imported from 3GU |
R2‑1915762 | Segmentation in DL | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, Verizon, KT, Sprint, Charter Communications, CMCC, TurkCell, OPPO, Kyocera | imported from 3GU |
R2‑1915763 | Introduction of RRC Segmentation - Downlink | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | imported from 3GU |
R2‑1915764 | Introduction of RRC Segmentation - Downlink | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | imported from 3GU |
R2‑1915765 | Remaining details of UL LBT failure mechanism | Qualcomm Incorporated | imported from 3GU |
R2‑1915766 | Issue of loop topology after RLF | SHARP Corporation | imported from 3GU |
R2‑1915767 | Validity of CHO configurations based on security configuration | SHARP Corporation | imported from 3GU |
R2‑1915768 | RLC aspects of DAPS handover | Ericsson | imported from 3GU |
R2‑1915769 | Reception type for ETWS/CMAS for non-BL UE in CE in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1915770 | Conditional measurement configuration for LEO NTN | InterDigital | imported from 3GU |
R2‑1915771 | Further considerations for the WUS | InterDigital | imported from 3GU |
R2‑1915772 | RRC release assistance for Control and User Plane CIoT EPS optimizations | Ericsson | imported from 3GU |
R2‑1915773 | Discussion on RLC bi-directional bearer setup for SL unicast | Apple | imported from 3GU |
R2‑1915774 | Discussion on remaining issues on HARQ process | Apple | imported from 3GU |
R2‑1915775 | Discussion on HARQ feedback for Sidelink Groupcast | Apple | imported from 3GU |
R2‑1915776 | Draft Reply LS on Sidelink HARQ Feedback for Groupcast | Apple | imported from 3GU |
R2‑1915777 | UE Mobility for Simultaneous Mode 1 & Mode 2 configuration | Apple | imported from 3GU |
R2‑1915778 | Resource allocations for UEs with simultaneous mode 1 & mode 2 configurations | Apple | imported from 3GU |
R2‑1915779 | Discussion on SLRB configuration during state transition | Apple | imported from 3GU |
R2‑1915780 | On-demand system information and dedicated signalling | MediaTek Inc., Ericsson | imported from 3GU |
R2‑1915781 | Introduction of RACS [36.300] | MediaTek Inc. | imported from 3GU |
R2‑1915782 | RRC release assistance for Control and User Plane CIoT EPS optimizations | Ericsson | imported from 3GU |
R2‑1915783 | Further details on Backhaul link RLF Notification Types to Downstream Node(s) | Ericsson | imported from 3GU |
R2‑1915784 | Introduction of RACS [38.300] | MediaTek Inc. | imported from 3GU |
R2‑1915785 | Processing time for segmented UE capability | MediaTek Inc. | imported from 3GU |
R2‑1915786 | 2-step RA 38.331 Running CR | Ericsson (Email disc rapporteur) | imported from 3GU |
R2‑1915787 | Report on email [107bis#77][2-step RACH] RRC details and running RRC CR (Ericsson) | Ericsson (Email disc rapporteur) | imported from 3GU |
R2‑1915788 | Report for email discussion [107bis#64][PRN] Suitable and acceptable NPN cells (Qualcomm) | Qualcomm Incorporated | imported from 3GU |
R2‑1915789 | Introduction of UECapabilityInformation segmentation in 36.331 | MediaTek Inc., CATT, Ericsson, Spreadtrum Communications, ZTE Corporation, Sanechips, OPPO, Qualcomm Incorporated | imported from 3GU |
R2‑1915790 | Work plan for RACS-RAN work item | MediaTek Inc., CATT | imported from 3GU |
R2‑1915791 | Support (or not) of PC5-RRC for groupcast | MediaTek Inc. | imported from 3GU |
R2‑1915792 | Capturing RLM for NR sidelink in stage 2 | MediaTek Inc. | imported from 3GU |
R2‑1915793 | RLM and state modelling based on PC5-S connection | MediaTek Inc. | imported from 3GU |
R2‑1915794 | Early security re-activation | Ericsson, LG electronics Inc, Sierra Wireless, Qualcomm Inc | imported from 3GU |
R2‑1915795 | Early security re-activation at RRC Connection Resume - Alternative 1 | Ericsson, LG Electronics Inc, Sierra Wireless, Qualcomm Inc | imported from 3GU |
R2‑1915796 | Early security re-activation at RRC Connection Resume - Alternative 2 | Ericsson, LG Electronics, Sierra Wireless, Qualcomm Inc | imported from 3GU |
R2‑1915797 | Early security re-activation at RRC Connection Resume | Ericsson, LG Electronics Inc, Sierra Wireless, Qualcomm Inc. | imported from 3GU |
R2‑1915798 | Asynchronous synchronisation reference sources | MediaTek Inc. | imported from 3GU |
R2‑1915799 | Validity areas based on cell lists | MediaTek Inc. | imported from 3GU |
R2‑1915800 | Running 38.304 CR for PRN | Qualcomm Incorporated | imported from 3GU |
R2‑1915801 | Group WUS | Ericsson | imported from 3GU |
R2‑1915802 | Adapting the BFD mechanism for consistent LBT failure detection | Google Inc. | imported from 3GU |
R2‑1915803 | CAPC for configured grants in NR-U | Google Inc. | imported from 3GU |
R2‑1915804 | Draft Reply LS on Sending CAG ID in NAS layer | Qualcomm Incorporated | imported from 3GU |
R2‑1915805 | Support for NPN HRNN broadcast | Qualcomm Incorporated | imported from 3GU |
R2‑1915806 | System support for Wake Up Signal | VODAFONE Group Plc | imported from 3GU |
R2‑1915807 | Views on cell reselection for CAGs | Qualcomm Incorporated | imported from 3GU |
R2‑1915808 | Extended MAC CE ID | Qualcomm Incorporated | imported from 3GU |
R2‑1915809 | RoHC and EHC configuration on same PDCP entity | Qualcomm Incorporated | imported from 3GU |
R2‑1915810 | Draft LS on need for Ethernet padding compression | Qualcomm Incorporated | imported from 3GU |
R2‑1915811 | Views on handling of PDUs and data of deprioritized grants | Qualcomm Incorporated | imported from 3GU |
R2‑1915812 | Discussion of RAN1 LS on propagation delay compensation and way forward | Qualcomm Incorporated | imported from 3GU |
R2‑1915813 | Feedback Frame Format for EHC and CIoT link | Qualcomm Incorporated | imported from 3GU |
R2‑1915814 | More granularity for PDCP discardTimer | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1915815 | PDCP duplication enhancements and RLC AM | Qualcomm Incorporated | imported from 3GU |
R2‑1915816 | Discussion on multiple configured grants | OPPO | imported from 3GU |
R2‑1915817 | Views on UE autonomous transmission using CG | Qualcomm Incorporated | imported from 3GU |
R2‑1915818 | MAC CE structure for PDCP duplication enhancement | Qualcomm Incorporated | imported from 3GU |
R2‑1915819 | Coexistence of measurement relaxation and early measurements | LG Electronics, Ericsson, MediaTek | imported from 3GU |
R2‑1915820 | RRM measurement relaxation based on measurement results | LG Electronics | imported from 3GU |
R2‑1915821 | Considerations on validity area in NR | LG Electronics | imported from 3GU |
R2‑1915822 | Handling early measurement results upon cell reselection | LG Electronics | imported from 3GU |
R2‑1915823 | Remaining issues on early measurement configuration | LG Electronics | imported from 3GU |
R2‑1915824 | Cell identification information in NTN | LG Electronics | imported from 3GU |
R2‑1915825 | Left issue on LCP for NR V2X | OPPO | imported from 3GU |
R2‑1915826 | Left issues on SR and BSR | OPPO | imported from 3GU |
R2‑1915827 | Views on SPS collisions and some CG issues | Qualcomm Incorporated | imported from 3GU |
R2‑1915828 | Simultaneous use of mode 1 and mode 2 | KT Corp. | imported from 3GU |
R2‑1915829 | Open issues on system information | OPPO | imported from 3GU |
R2‑1915830 | MAC prioritization for Intra-UE prioritization | Qualcomm Incorporated | imported from 3GU |
R2‑1915831 | Value of UE-based PDCP duplication | Qualcomm Incorporated | imported from 3GU |
R2‑1915832 | Clarification on candidate NR frequencies for IDC in EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R2‑1915833 | Discussion on Scell handling for CA | Huawei, HiSilicon | imported from 3GU |
R2‑1915834 | Correction on Scell handling for CA | Huawei, HiSilicon | imported from 3GU |
R2‑1915835 | Correction on Scell handling for CA | Huawei, HiSilicon | imported from 3GU |
R2‑1915836 | Correction on Scell handling for CA | Huawei, HiSilicon | imported from 3GU |
R2‑1915837 | Correction to the handling of stored AS context upon CN type change | Huawei, HiSilicon | imported from 3GU |
R2‑1915838 | Correction on RRC_INACTIVE state | Huawei, HiSilicon | imported from 3GU |
R2‑1915839 | Discussion on segment number for CMAS notification | Huawei, HiSilicon | imported from 3GU |
R2‑1915840 | Technical considerations on new QMC requirements from SA5 | Huawei, HiSilicon | imported from 3GU |
R2‑1915841 | Discussion on potential impacts to other WGs due to new QMC requirements from SA5 | Huawei, HiSilicon | imported from 3GU |
R2‑1915842 | Report of email discussion 107b-51 | Huawei | imported from 3GU |
R2‑1915843 | Correction on non-3GPP paging | Huawei, HiSilicon | imported from 3GU |
R2‑1915844 | Discussion on configuration aspect for CHO | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1915845 | Discussion on execution aspect for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1915846 | Discussion on combination of simultaneous connectivity and CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1915847 | Discussion on MN initiated conditional PScell change | Huawei, HiSilicon | imported from 3GU |
R2‑1915848 | Discussion on conditional PScell change | Huawei, HiSilicon | imported from 3GU |
R2‑1915849 | Draft LS to RAN3 on conditional Pscell addition/change | Huawei, HiSilicon | imported from 3GU |
R2‑1915850 | Report of email discussion [107bis#83] MDT | Huawei | imported from 3GU |
R2‑1915851 | Running 38.331 CR for introducing MDT | Huawei, Ericsson | imported from 3GU |
R2‑1915852 | Discussion on open issues for running 38.331 CR for MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1915853 | Discussion on logging NR neighbour cell measurements for LTE MDT and SON | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1915854 | Introduction of NR neighbour cell measurements for LTE MDT and SON | Huawei, HiSilicon, CMCC | imported from 3GU |
R2‑1915855 | Discussion on remaining aspects on logged MDT and Accessibility measurements in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1915856 | Discussion on remaining aspects on immediate MDT in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1915857 | Discussion on remaining aspects on MDT and mobility history information in MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915858 | Discussion on delay measurement and collection | Huawei, HiSilicon | imported from 3GU |
R2‑1915859 | Discussion on SA5 defined measurements for the immediate MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1915860 | Discussion on the throughput measurements in MR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915861 | Discussion on remaining aspects on SON | Huawei, HiSilicon | imported from 3GU |
R2‑1915862 | Remaining issues in PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1915863 | Handling of DRB integrity verification failure | LG Electronics Inc. | imported from 3GU |
R2‑1915864 | Handling of EHC protocol at PDCP re-establishment | LG Electronics Inc. | imported from 3GU |
R2‑1915865 | Latency reduction enhancements for SCG RACH procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1915866 | Enhancements to PUCCH-UCI and PHR | Ericsson | imported from 3GU |
R2‑1915867 | Remaining issues on Configured Grant | Ericsson | imported from 3GU |
R2‑1915868 | Channel access priority for Configured Grant | Ericsson | imported from 3GU |
R2‑1915869 | DRX enhancement for NR-U | Ericsson | imported from 3GU |
R2‑1915870 | Handling consistent UL LBT failures | Ericsson | imported from 3GU |
R2‑1915871 | RACH enhancements for NR-U | Ericsson | imported from 3GU |
R2‑1915872 | 2-step Random Access for NR-U | Ericsson | imported from 3GU |
R2‑1915873 | Running MAC CR for NR-U | Ericsson | imported from 3GU |
R2‑1915874 | Rapporteur input on Running MAC CR for NR-U | Ericsson | imported from 3GU |
R2‑1915875 | Introduction of wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1915876 | Introduction of wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1915877 | UDC reconfiguration for RRC connection re-establishment case | Huawei, HiSilicon | imported from 3GU |
R2‑1915878 | Discussion on DL MIMO efficiency enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1915879 | Introduction of DL MIMO efficiency enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1915880 | Introduction of DL MIMO efficiency enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1915881 | Introduction of cross link interfernce management | Huawei, HiSilicon | imported from 3GU |
R2‑1915882 | Leftover issues on CLI | Huawei, HiSilicon | imported from 3GU |
R2‑1915883 | Improvements for non-BL UEs camping in CE Mode | Apple (UK) Limited | imported from 3GU |
R2‑1915884 | Missing RACH aspect for DC | Nokia, Nokia Shanghai Bell, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1915885 | UL LBT failure detection | Nokia, Nokia Shanghai Bell, InterDigital, MediaTek, OPPO | imported from 3GU |
R2‑1915886 | UL LBT failure report | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915887 | Multiple configured grants for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1915888 | LCP restriction for SRBs | Nokia, Nokia Shanghai Bell, Futurewei, Interdigital, Huawei, HiSilicon, MediaTek, Lenovo | imported from 3GU |
R2‑1915889 | Stage-2 running CR for 2-step RACH | Nokia (rapporteur), Nokia Shanghai Bell | imported from 3GU |
R2‑1915890 | Clarification for aggregated bandwidth for overheating | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1915891 | Clarification on the feature set report in EUTRAN | Huawei, HiSilicon | imported from 3GU |
R2‑1915892 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.331) | Huawei, HiSilicon | imported from 3GU |
R2‑1915893 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.306) | Huawei, HiSilicon | imported from 3GU |
R2‑1915894 | On the RAN2 signalling support for new introduced channel bandwidth | Huawei, HiSilicon | imported from 3GU |
R2‑1915895 | CR to 38.331 on support of 70MHz channel bandwidth -option1 with IODT bit | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1915896 | CR to 38.306 on support of 70MHz channel bandwidth -option1 with IODT bit | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1915897 | CR to 38.331 on support of 70MHz channel bandwidth -option2 | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1915898 | CR to 38.306 on support of 70MHz channel bandwidth -option2 | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1915899 | On the capability of EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R2‑1915900 | CR to clarify the power class for EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915901 | Forward compatibility discussion on channel bandwidths parameter | Huawei, HiSilicon | imported from 3GU |
R2‑1915902 | CR on forward compatibility for channel bandwidths parameter | Huawei, HiSilicon | imported from 3GU |
R2‑1915903 | CR on CSI UE capabilities parameters (38.331) | Huawei, HiSilicon | imported from 3GU |
R2‑1915904 | CR on CSI UE capabilities parameters (38.306) | Huawei, HiSilicon | imported from 3GU |
R2‑1915905 | Corrections on PDCCH blind decoding in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1915906 | Discussion on performing ROHC and EHC | LG Electronics Inc. | imported from 3GU |
R2‑1915907 | Discussion on EHC feedback | LG Electronics Inc. | imported from 3GU |
R2‑1915908 | Dicussion on padding removal | LG Electronics Inc. | imported from 3GU |
R2‑1915909 | When to apply the target network configurations | LG Electronics Inc. | imported from 3GU |
R2‑1915910 | Need of discard indication | LG Electronics Inc. | imported from 3GU |
R2‑1915911 | Need of PDCP status report | LG Electronics Inc. | imported from 3GU |
R2‑1915912 | Discussion on DAPS HO for UM DRB | LG Electronics Inc. | imported from 3GU |
R2‑1915913 | Scheduling enhancement in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1915914 | Extension of the LCID | LG Electronics Inc. | imported from 3GU |
R2‑1915915 | Considerations on failure handling for CPAC in NR | Potevio | imported from 3GU |
R2‑1915916 | Deprioritized PDU Retransmission Schemes | Apple (UK) Limited | imported from 3GU |
R2‑1915917 | Contents of a new CG confirmation MAC CE for multiple CG configurations | LG Electronics Inc. | imported from 3GU |
R2‑1915918 | Remaining issues in intra-UE prioritization | LG Electronics Inc. | imported from 3GU |
R2‑1915919 | Measurement gap skipping for TSN traffic | LG Electronics Inc. | imported from 3GU |
R2‑1915920 | Additional opportunity for Msg1 in 4-step RACH | LG Electronics Inc. | imported from 3GU |
R2‑1915921 | Dynamic DL opportunity enhancement based on channel busy level in NR-U | LG Electronics Inc. | imported from 3GU |
R2‑1915922 | Discussion on SCell BFR procedure | LG Electronics Inc. | imported from 3GU |
R2‑1915923 | Enhancements of SR cancellation for URLLC traffic | LG Electronics Inc. | imported from 3GU |
R2‑1915924 | Open Issues on PDCCH-WUS Mechanism | Apple | imported from 3GU |
R2‑1915925 | UE Assistance Information for CDRX Configuration | Apple | imported from 3GU |
R2‑1915926 | UE Assistance Information for SCell Configuration | Apple | imported from 3GU |
R2‑1915927 | UE Assistance Information for MR-DC | Apple | imported from 3GU |
R2‑1915928 | RAN1 Impact on MsgB Design | Apple | imported from 3GU |
R2‑1915929 | 2-Step CFRA | Apple | imported from 3GU |
R2‑1915930 | Further Detail on CHO Release | Apple | imported from 3GU |
R2‑1915931 | DAPS HO UP | Apple | imported from 3GU |
R2‑1915932 | DRB specific DAPS HO | Apple | imported from 3GU |
R2‑1915933 | SCG Suspension | Apple | imported from 3GU |
R2‑1915934 | SCell BFR Operation | Apple | imported from 3GU |
R2‑1915935 | PCell BFR Operation | Apple | imported from 3GU |
R2‑1915936 | Positioning SIB Acquisition in Connected Mode | Apple | imported from 3GU |
R2‑1915937 | Preamble Selection for RACH Procedure | Apple | imported from 3GU |
R2‑1915938 | Sidelink and Uplink Prioritization in cross-RAT | Samsung | imported from 3GU |
R2‑1915939 | Layer2 ID and cast type in SL MAC header | Samsung | imported from 3GU |
R2‑1915940 | Discussion on V2X specific validity area | Samsung | imported from 3GU |
R2‑1915941 | TX profile for selected sidelink RAT | Samsung | imported from 3GU |
R2‑1915942 | Some remaining issues on the UE assistance information | Xiaomi Communications | imported from 3GU |
R2‑1915943 | Remaining Issues for PDCP Duplication Enhancements for IIOT | Apple (UK) Limited | imported from 3GU |
R2‑1915944 | Discussion on Configuration of MCG Fast Recovery | CATT | imported from 3GU |
R2‑1915945 | DRX enhancement for NR-U | Xiaomi Communications | imported from 3GU |
R2‑1915946 | UE based PDCP Duplication Enhancement | Apple (UK) Limited | imported from 3GU |
R2‑1915947 | Discussion on MT EDT support for 5G CIoT | LG Electronics UK | imported from 3GU |
R2‑1915948 | RRC message for UP CIoT 5GS Optimisation | LG Electronics UK | imported from 3GU |
R2‑1915949 | Report of Email discussion [106#65][R16 eMTC] UE identifier pros and cons | LG Electronics UK | imported from 3GU |
R2‑1915950 | Draft LS on UE Identifier in UP CIoT 5GS Optimisation | LG Electronics UK | imported from 3GU |
R2‑1915951 | Discussion on D-PUR request and TA validity check | LG Electronics UK | imported from 3GU |
R2‑1915952 | Paging response usign D-PUR | LG Electronics UK | imported from 3GU |
R2‑1915953 | Support for S-PUR | LG Electronics UK | imported from 3GU |
R2‑1915954 | Consideration on the report of BWP information and on demand request failure information | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1915955 | UE Radio Capabilities Segmentation Remaining Issues | Apple (UK) Limited | imported from 3GU |
R2‑1915956 | Consideration on SR transmission colliding with PUSCH transmission | Xiaomi Communications | imported from 3GU |
R2‑1915957 | General considerations on idle and inactive mode for NPN | Huawei, HiSilicon | imported from 3GU |
R2‑1915958 | General considerations on connected mode for NPN | Huawei, HiSilicon | imported from 3GU |
R2‑1915959 | Considerations on SI Validity Checking | Huawei, HiSilicon | imported from 3GU |
R2‑1915960 | DRAFT LS to SA3 on Conditional PSCell addition/change | CATT | imported from 3GU |
R2‑1915961 | DRAFT LS to RAN3 on Conditional PSCell addition/change | CATT | imported from 3GU |
R2‑1915962 | Report on Email Discussion [107b#52][NR MobE] Open issues Conditional PSCell addition/change | CATT | imported from 3GU |
R2‑1915963 | Further details of CHO configuration and execution | China Telecom | imported from 3GU |
R2‑1915964 | Remaining issues on accurate reference timing delivery | NTTDOCOMO, INC | imported from 3GU |
R2‑1915965 | Handling of releasing source stacks for DAPS | China Telecommunications | imported from 3GU |
R2‑1915966 | Discussion on Sidelink Configured Grant support | Huawei, HiSilicon | imported from 3GU |
R2‑1915967 | Discussion on remaining issues of SR and BSR for SL Mode 1 | Huawei, HiSilicon | imported from 3GU |
R2‑1915968 | Discussion on HARQ support for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1915969 | Remaining issues on NR SL and NR UL prioritization | Huawei, HiSilicon | imported from 3GU |
R2‑1915970 | Further discussion on SLRB configuration via SIB | Huawei, HiSilicon | imported from 3GU |
R2‑1915971 | Remaining issues on cell reselection | Huawei, HiSilicon | imported from 3GU |
R2‑1915972 | SLRB configurations handling during UE state transition | Huawei, HiSilicon | imported from 3GU |
R2‑1915973 | Further details of Uu RRC procedures for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1915974 | Discussion on related aspects of system information | Huawei, HiSilicon | imported from 3GU |
R2‑1915975 | On potential RAN2 impacts related to security design for NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1915976 | [Draft] LS on potential RAN2 impacts related to NR SL security design | Huawei | imported from 3GU |
R2‑1915977 | Discussion on the NR sidelink failure cases | Huawei, HiSilicon | imported from 3GU |
R2‑1915978 | Discussion about mode coexistence for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1915979 | Running CR to 36.331 for NR V2X | Huawei, HiSilicon | imported from 3GU |
R2‑1915980 | TP on NR-V2X for TR 37.985 - RAN2 parts | Huawei, HiSilicon | imported from 3GU |
R2‑1915981 | Summary of email discussion [107bis#96][V2X] RLC AM mismatch | Huawei (Rapporteur) | imported from 3GU |
R2‑1915982 | Summary of email discussion [107bis#91][V2X] - Miscellaneous RRC issues for 5G V2X with NR Sidelink | Huawei (Rapporteur) | imported from 3GU |
R2‑1915983 | Running CR to TS 38.331 for 5G V2X with NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1915984 | Discussion on Sidelink L3 RSRP and CSI reporting in NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1915985 | Draft Stage-2 CR for Conditional PSCell Addition/Change | CATT | imported from 3GU |
R2‑1915986 | [107bis#82][NR MDT] 37.320 running CR | CMCC, Nokia | imported from 3GU |
R2‑1915987 | Leftovers for TS 37.320 to support NR MDT | CMCC | imported from 3GU |
R2‑1915988 | LS on Logged Measurements | CMCC | imported from 3GU |
R2‑1915989 | Cell selection and reselection for NPN | CMCC | imported from 3GU |
R2‑1915990 | Access and mobility control for NPN | CMCC | imported from 3GU |
R2‑1915991 | CAG ID transmission during both initial access and resume | CMCC | imported from 3GU |
R2‑1915992 | Draft Reply LS on CAG ID Transmission | CMCC | imported from 3GU |
R2‑1915993 | Approaches comparison of supporting TSN periodicities of non-integer CG-SPS periodicities | CMCC | imported from 3GU |
R2‑1915994 | Supported periodicity values for CG SPS Configurations | CMCC | imported from 3GU |
R2‑1915995 | Repetitions Transmission for SPS configurations | CMCC | imported from 3GU |
R2‑1915996 | Down selection on the PDCP Duplication MAC CE Structure | CMCC | imported from 3GU |
R2‑1915997 | Message Mergence for fast HO failure recovery | CMCC | imported from 3GU |
R2‑1915998 | Discussion of UL data transmission switch for DAPS | CMCC | imported from 3GU |
R2‑1915999 | Left issues of the new confirmation MAC CE format | CMCC | imported from 3GU |
R2‑1916000 | Handling for CG resource collision of equal priority | CMCC | imported from 3GU |
R2‑1916001 | Discussion on impact of PDCCH-WUS on timer-based BWP switching | CMCC | imported from 3GU |
R2‑1916002 | Discussion on UE assistance information | CMCC | imported from 3GU |
R2‑1916003 | Discussion on human-readable network name | China Telecommunications | imported from 3GU |
R2‑1916004 | Sidelink RSRP reporting | MediaTek Inc. | imported from 3GU |
R2‑1916005 | Sidelink RLF enhancement | MediaTek Inc. | imported from 3GU |
R2‑1916006 | Remaining issues on user plane aspects | LG Electronics | imported from 3GU |
R2‑1916007 | Open issue of uplink MDBV enforcement | Huawei, HiSilicon | imported from 3GU |
R2‑1916008 | Correction on PRACH procedure with SRS switching | Huawei, HiSilicon | imported from 3GU |
R2‑1916009 | Correction on description of BFR RAR window in 38.321 | Huawei, HiSilicon | imported from 3GU |
R2‑1916010 | Stopping ra-ResponseWindow for contention-free BFR | Huawei, HiSilicon | imported from 3GU |
R2‑1916011 | Summary of [107bis#48][TEI16UP] Correction on PRACH re-transmission for SRS carrier switching | Huawei, HiSilicon | imported from 3GU |
R2‑1916012 | Correction on autonomous RACH retransmission for SRS switching | Huawei, HiSilicon | imported from 3GU |
R2‑1916013 | Remaining issues on PDU format for MsgB | Huawei, HiSilicon | imported from 3GU |
R2‑1916014 | MsgA resource configuration and selection | Huawei, HiSilicon | imported from 3GU |
R2‑1916015 | Remaining issues on MsgB reception | Huawei, HiSilicon | imported from 3GU |
R2‑1916016 | Discussion on MsgB-RNTI design | Huawei, HiSilicon | imported from 3GU |
R2‑1916017 | Remaining issues on the msgA transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1916018 | Further Discussions on Fallback Procedure for 2-step RACH | Huawei, HiSilicon | imported from 3GU |
R2‑1916019 | Discussion on RRC configurations of L1 parameters for eURLLC | Huawei, HiSilicon | imported from 3GU |
R2‑1916020 | Running 38.331 CR for NR_L1enh_URLLC | Huawei, HiSilicon | imported from 3GU |
R2‑1916021 | Overview of MAC impacts of URLLC enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1916022 | Running 38.321 CR for NR_L1enh_URLLC | Huawei, HiSilicon | imported from 3GU |
R2‑1916023 | Running 38.300 CR for NR_L1enh_URLLC | Huawei, HiSilicon | imported from 3GU |
R2‑1916024 | RNTI for msgB | LG Electronics | imported from 3GU |
R2‑1916025 | Considerations on simultaneous configuration of mode 1 and 2 | ITL | imported from 3GU |
R2‑1916026 | Reselection to a Cell with Valid Dedicated Frequency Offset | MediaTek Inc. | imported from 3GU |
R2‑1916027 | Draft LS to RAN1 on RNTI for msgB | LG Electronics | imported from 3GU |
R2‑1916028 | Consideration on 2-step CFRA | LG Electronics | imported from 3GU |
R2‑1916029 | Logical channel based RA type selection | LG Electronics Inc. | imported from 3GU |
R2‑1916030 | Running CR to 38.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1916031 | Running CR to 36.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1916032 | Clarification on informative timer table | Huawei, HiSilicon | imported from 3GU |
R2‑1916033 | Clarification on the using of RRCSetup | Huawei, HiSilicon | imported from 3GU |
R2‑1916034 | Corrections on the PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1916035 | Correction on initial BWP bandwidth capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑1916036 | Remaining issues on random access procedures in NTN | ETRI | imported from 3GU |
R2‑1916037 | Remaining issues of SCell BFR | ASUSTeK | imported from 3GU |
R2‑1916038 | Discussion on association between sidelink data and resource allocation modes | ASUSTeK | imported from 3GU |
R2‑1916039 | Discussion on resource allocation for sidelink HARQ ACK/NACK report | ASUSTeK | imported from 3GU |
R2‑1916040 | Discussion on traditional uplink traffic and IAB uplink traffic regarding to pre-emptive BSR | ASUSTeK | imported from 3GU |
R2‑1916041 | Handling D-PUR configuration in RRC_CONNECTED state | ASUSTeK | imported from 3GU |
R2‑1916042 | Remaining issues of D-PUR TA timer | ASUSTeK | imported from 3GU |
R2‑1916043 | Buffer status indicated by BSR in multi-TB scheduling | ASUSTeK | imported from 3GU |
R2‑1916044 | Issue related to CG overridden by PDCCH | ASUSTeK | imported from 3GU |
R2‑1916045 | CG overridden | ASUSTeK | imported from 3GU |
R2‑1916046 | Release of UE assistance information | OPPO | imported from 3GU |
R2‑1916047 | Correction on RRC Resume procedure | OPPO | imported from 3GU |
R2‑1916048 | Discussion on human-readable network name | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1916049 | Consideration of beam for NR OTDOA | Samsung R&D Institute UK | imported from 3GU |
R2‑1916050 | Considerations for NR E-CID | Samsung R&D Institute UK | imported from 3GU |
R2‑1916051 | Measurement aspects for CHO | Samsung R&D Institute UK | imported from 3GU |
R2‑1916052 | Clarification on failure handling using CHO | Samsung R&D Institute UK | imported from 3GU |
R2‑1916053 | Normal handover using conditional handover configuration | Samsung R&D Institute UK | imported from 3GU |
R2‑1916054 | On the supporting of relaxed measurement state for UE power saving | Samsung R&D Institute UK | imported from 3GU |
R2‑1916055 | EN-DC support in IAB | Samsung R&D Institute UK | imported from 3GU |
R2‑1916056 | NR-DC support in IAB (signaling perspective) | Samsung R&D Institute UK | imported from 3GU |
R2‑1916057 | Remaining issues on IAB RLF | Samsung R&D Institute UK | imported from 3GU |
R2‑1916058 | Delivering T_delta for IAB node | Samsung R&D Institute UK | imported from 3GU |
R2‑1916059 | Discussion on UE capability | China Telecom | imported from 3GU |
R2‑1916060 | RNTI design for msgB | Qualcomm Incorporated | imported from 3GU |
R2‑1916061 | Cell Selection for Backhaul RLF Recovery | Futurewei Technologies | imported from 3GU |
R2‑1916062 | Contention resolution for msgA with C-RNTI | Qualcomm Incorporated | imported from 3GU |
R2‑1916063 | Discussion on the deployment for CAG | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1916064 | msgB MAC PDU format | Qualcomm Incorporated | imported from 3GU |
R2‑1916065 | Remaining issue on 2-step RACH fall back procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1916066 | Enhanced TCI States Activation/Deactivation PDSCH MAC CE for Multi-TRP | Qualcomm Incorporated | imported from 3GU |
R2‑1916067 | Procedures and MAC CE design for BFR for SCells | Qualcomm Incorporated | imported from 3GU |
R2‑1916068 | Some Considerations on autonomous re-transmission for deprioritized configured grant | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916069 | The remaining issues on BFR on SCell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916070 | The remaining issues on mPDCCH mTRP transmission | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916071 | The remaining issues on LCP restriction for CG | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916072 | The CR to 38.321 for on UL grant reception in RAR | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916073 | Considerations on support of split bearer in the case of PDCP duplication with multiple copies | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916074 | Discussion on UE based PDCP Duplication activationdeactivation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916075 | Consideration on the multiplexing BSR MAC CE and URLLC data | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916076 | Consideration on HARQ conflict between configured grant and dynamic grant | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916077 | Discussion on the ambiguity in calculation of RA-RNTI | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916078 | Discussion on UE behaviours for access barring alleviation | Google Inc. | imported from 3GU |
R2‑1916079 | Discussion of UL data transmission switch for DAPS | CMCC | imported from 3GU |
R2‑1916080 | Clarification on UE Inactive AS context | Google Inc. | imported from 3GU |
R2‑1916081 | Correction on PUSCH-less Scell | Huawei, HiSilicon | imported from 3GU |
R2‑1916082 | Clarification on UE Inactive AS context | Google Inc. | imported from 3GU |
R2‑1916083 | Discussion on MSGB-RNTI design | imported from 3GU | |
R2‑1916084 | Discussion on msgB HARQ process | imported from 3GU | |
R2‑1916085 | RLC re-establishment when PDCP is re-established | Qualcomm Incorporated | imported from 3GU |
R2‑1916086 | On Supporting Make-Before-Break in NR | Samsung | imported from 3GU |
R2‑1916087 | Introducing Make-Before-Break in NR | Samsung | imported from 3GU |
R2‑1916088 | Open Issues on NR-U Uplink Transmission | Qualcomm Incorporated | imported from 3GU |
R2‑1916089 | On Triggering RRM Measurement Relaxation | Samsung | imported from 3GU |
R2‑1916090 | Remaining issue on Groupcast and Broadcast QoS Report | ITRI | imported from 3GU |
R2‑1916091 | Remaining issue on UE-based positioning in NR | ITRI | imported from 3GU |
R2‑1916092 | On NR-U Operation in DFS Channels | Charter Communications, Inc | imported from 3GU |
R2‑1916093 | Accessibility Measurements for NR MDT | Samsung | imported from 3GU |
R2‑1916094 | Remaining Issues on Consistent LBT Failure Detection in NRU | Charter Communications, Inc | imported from 3GU |
R2‑1916095 | Further Logged Information in NR MDT | Samsung | imported from 3GU |
R2‑1916096 | Discussion on the support of CA duplication with multiple legs | vivo | imported from 3GU |
R2‑1916097 | Discussion on Network identifier for SNPN | vivo | imported from 3GU |
R2‑1916098 | Discussion on the proximity indication in CONNECTED mode | vivo | imported from 3GU |
R2‑1916099 | IP address configuration for IAB | Samsung | imported from 3GU |
R2‑1916100 | RLF Report Enhancement | Samsung | imported from 3GU |
R2‑1916101 | UL mapping configuration | Samsung | imported from 3GU |
R2‑1916102 | On supporting Event-triggered Logged MDT | Samsung | imported from 3GU |
R2‑1916103 | On Providing Mobility State and Mobility History Information in NR | Samsung | imported from 3GU |
R2‑1916104 | PDCP enhancement for NTN | LG Electronics Inc. | imported from 3GU |
R2‑1916105 | Angle of Departure UE positioning technique | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916106 | On-demand and dynamic PRS configuration for DL-TDOA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916107 | Dedicated positioning SIB delivery for on-demand SI in connected | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916108 | PC5 groupcast handling | Qualcomm Incorporated | imported from 3GU |
R2‑1916109 | plmn-IdentityList in CellAccessRelatedInfo broadcast in SIB1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916110 | Handling of new flow when the number of stored contexts are already equal to the MAX_CID | SHARP Corporation | imported from 3GU |
R2‑1916111 | On per DAPS handover | SHARP Corporation | imported from 3GU |
R2‑1916112 | Stopping of SI acquisition for ETWS/CMAS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916113 | Handling of bwp-InactivityTimer upon BWP switching | LG Electronics Deutschland | imported from 3GU |
R2‑1916114 | On Stopping of Paging Monitoring for UE Energy Savings | MediaTek Inc. | imported from 3GU |
R2‑1916115 | Remaining issues on RACH without location information | Huawei, HiSilicon | imported from 3GU |
R2‑1916116 | RACH resource configuration and utilization in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1916117 | Running CR for the introduction of SRVCC from 5G to 3G | China Unicom, Huawei, HiSilicon | imported from 3GU |
R2‑1916118 | Handling LBT failures for support of wideband operations | ETRI | imported from 3GU |
R2‑1916119 | Running CR to 36.321 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1916120 | Running CR to 38.321 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1916121 | Report of 107bis#93 open issues on 38.321 on NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1916122 | Proposed LS on TX resource (re-)reselection | LG Electronics Inc. | imported from 3GU |
R2‑1916123 | Remaining MAC issues and response to RAN1 LS | LG Electronics Inc. | imported from 3GU |
R2‑1916124 | Proposed Response LS on additional high layer information for sidelink physical layer operations | LG Electronics Inc. | imported from 3GU |
R2‑1916125 | PC5-RRC connection establishment and release with PC5 unicast link | LG Electronics Inc. | imported from 3GU |
R2‑1916126 | PC5-RRC and Uu RRC procedures | LG Electronics Inc. | imported from 3GU |
R2‑1916127 | MAC header for SL-SCH | Qualcomm CDMA Technologies | imported from 3GU |
R2‑1916128 | Remaining issues on CLI measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916129 | Reply LS on signalling of sidelink RSRP and CSI | LG Electronics Inc. | imported from 3GU |
R2‑1916130 | Sidelink HARQ operation in mode 1 | ITL | imported from 3GU |
R2‑1916131 | Retransmission of an RLC SDU with a poll after discard procedure | LG Electronics Inc., Ericsson, NTT Docomo, LG Uplus | imported from 3GU |
R2‑1916132 | Consideration on the postponed decision on DL hop-by-hop flow control | LG Electronics, AT&T, Ericsson, Huawei, Verizon | imported from 3GU |
R2‑1916133 | Consideration on local re-routing after BH RLF | LG Electronics Inc. | imported from 3GU |
R2‑1916134 | BSR MAC CE format for pre-BSR | LG Electronics Inc. | imported from 3GU |
R2‑1916135 | Consideration on remaining FFS of LCID extension | LG Electronics Inc. | imported from 3GU |
R2‑1916136 | Remaining issues for DL flow control | LG Electronics Inc. | imported from 3GU |
R2‑1916137 | LCG based UL grant | LG Electronics Inc. | imported from 3GU |
R2‑1916138 | Way forward for CP bearer mapping | LG Electronics Inc. | imported from 3GU |
R2‑1916139 | Need of BAP buffer | LG Electronics Inc. | imported from 3GU |
R2‑1916140 | Consideration on BAP Routing ID for UL | LG Electronics Inc. | imported from 3GU |
R2‑1916141 | Discussion on the flow control | ITL | imported from 3GU |
R2‑1916142 | NE-DC dynamic power sharing capability | Qualcomm Incorporated | imported from 3GU |
R2‑1916143 | NE-DC dynamic power sharing capability | Qualcomm Incorporated | imported from 3GU |
R2‑1916144 | DL BWP Configuration mandatory fields upon SCell addition | Qualcomm Incorporated | imported from 3GU |
R2‑1916145 | Allow fallback band combinations for reporting SRS-TxSwitch capability | Qualcomm Incorporated | imported from 3GU |
R2‑1916146 | Expectation when srs-TxSwitch capability is not supported | Qualcomm Incorporated | imported from 3GU |
R2‑1916147 | Discussion of the PUCCH & SRS Resource Release | Qualcomm Incorporated | imported from 3GU |
R2‑1916148 | Discussion on DRX operation associated with disabling HARQ feedback | LG Electronics Polska | imported from 3GU |
R2‑1916149 | PC5-RRC and PC5-S interactions and their security in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1916150 | Discussion on L2 measurement in EN-DC | NTT DOCOMO INC. | imported from 3GU |
R2‑1916151 | Further consideration on capability reporting | LG Electronics Inc. | imported from 3GU |
R2‑1916152 | Further Considerations on multiple C-DRX | Samsung | imported from 3GU |
R2‑1916153 | MAC impacts of multiple CCAs in wide band operation | LG Electronics Polska | imported from 3GU |
R2‑1916154 | Discussion on UE location information in SCG failure report | NTT DOCOMO INC. , Ericsson | imported from 3GU |
R2‑1916155 | Remaining issues of header compression for IIoT | NTT DOCOMO INC. | imported from 3GU |
R2‑1916156 | UE autonomous transmission in a CG resource for deprioritized data | Huawei, HiSilicon | imported from 3GU |
R2‑1916157 | Clarification of suspended SCG | LG Electronics Inc. | imported from 3GU |
R2‑1916158 | Discussion on LTE and EN-DC Measurement Gap configuration coordination | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916159 | PDCP for PC5-S, PC5-RRC | Qualcomm CDMA Technologies | imported from 3GU |
R2‑1916160 | Discussion and TP on MAC PDU overwriting in CG resource | LG Electronics Polska | imported from 3GU |
R2‑1916161 | Resumption of suspended SCG | LG Electronics Inc. | imported from 3GU |
R2‑1916162 | PC5-S, PC5-RRC RLC mode | Qualcomm CDMA Technologies | imported from 3GU |
R2‑1916163 | Discussion on indication for presence of RRC messages | LG Electronics Polska | imported from 3GU |
R2‑1916164 | Draft TS 38.340 (BAP) | Huawei | imported from 3GU |
R2‑1916165 | PC5-RRC support for Groupcast | Qualcomm CDMA Technologies | imported from 3GU |
R2‑1916166 | Management of Control Plane during DAPS HO_NR | LG Electronics France | imported from 3GU |
R2‑1916167 | Access control in IAB networks | LG Electronics France | imported from 3GU |
R2‑1916168 | BH RLF Notification Terminaton Layer | LG Electronics France | imported from 3GU |
R2‑1916169 | Resolving open issues on BH RLF | LG Electronics France | imported from 3GU |
R2‑1916170 | Access control for PRN | LG Electronics France | imported from 3GU |
R2‑1916171 | MDT for DC | LG Electronics France | imported from 3GU |
R2‑1916172 | Clarification to CSI reporting in C-DRX | Qualcomm Inc | imported from 3GU |
R2‑1916173 | Correction to PHR in dual connectivity | Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1916174 | Correction to long truncated BSR | Qualcomm Inc | imported from 3GU |
R2‑1916175 | Configuration aspects of wakeup signaling | Qualcomm Inc | imported from 3GU |
R2‑1916176 | Link management with WUS | Qualcomm Inc | imported from 3GU |
R2‑1916177 | Prohibit timer for Release Request | Qualcomm Inc | imported from 3GU |
R2‑1916178 | Remaining issues on UE Assistance Information | Qualcomm Inc | imported from 3GU |
R2‑1916179 | UE indication on expected data | Qualcomm Inc, Apple | imported from 3GU |
R2‑1916180 | Cross cell group wakeup message in MR-DC | Qualcomm Inc, Futurewei | imported from 3GU |
R2‑1916181 | Backoff indication in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1916182 | Enhancements to PHR in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1916183 | New values for RLC and PDCP timers | Qualcomm Inc, LG Electronics | imported from 3GU |
R2‑1916184 | Correction on mini-slot scheduling | Fujitsu, Nokia (Rapporteur) | imported from 3GU |
R2‑1916185 | Impacts of L1 priorities on data prioritization | Fujitsu | imported from 3GU |
R2‑1916186 | Remaining issues on de-prioritized MAC PDU on CG resource | LG Electronics Polska | imported from 3GU |
R2‑1916187 | General aspects on cDRX enhancement | NEC | imported from 3GU |
R2‑1916188 | CR on LTE and EN-DC Measurement Gap configuration coordination | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916189 | Sidelink CSI report | MediaTek Inc. | imported from 3GU |
R2‑1916190 | Inter-RAT BSR | MediaTek Inc. | imported from 3GU |
R2‑1916191 | CR on NeedForGap capability for each supported NR band before EN-DC configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916192 | Work plan for Rel-16 UE Capability feature list | Intel Corporation | imported from 3GU |
R2‑1916193 | Discussion on NeedForGap signalling in NR SA before NE-DC or NR-DC configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916194 | Discussion on multiple triggering conditions for CHO | Samsung Electronics Polska | imported from 3GU |
R2‑1916195 | Confirmation of working assumption for T312 support on PSCell | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | imported from 3GU |
R2‑1916196 | Discussion on DRX operation impact for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916197 | CHO compliance check and handling | CMCC | imported from 3GU |
R2‑1916198 | Introduction of T312 for PCell and PSCell in NR (Draft) | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | imported from 3GU |
R2‑1916199 | Further consideration on T312 for conditional handover | LG Electronics Inc | imported from 3GU |
R2‑1916200 | Cell (re)selection after consecutive UL LBT failures | LG Electronics Inc | imported from 3GU |
R2‑1916201 | RLM/RLF enhancements in NR-U | LG Electronics Inc | imported from 3GU |
R2‑1916202 | SSI and channel occupancy measurements for serving frequency | LG Electronics Inc | imported from 3GU |
R2‑1916203 | Stopping condition for monitoring additional paging occasions in NR-U | LG Electronics Inc | imported from 3GU |
R2‑1916204 | Support of conditional handover for NR-U | LG Electronics Inc | imported from 3GU |
R2‑1916205 | Measurement ID Swapping Issue for CHO | LG Electronics Inc. | imported from 3GU |
R2‑1916206 | Consideration of CHO Release After HO | LG Electronics Inc. | imported from 3GU |
R2‑1916207 | SCG Failure Handling with Conditional PSCell Configuration | LG Electronics Inc. | imported from 3GU |
R2‑1916208 | Consideration of After-action upon Conditional PSCell Addition | LG Electronics Inc. | imported from 3GU |
R2‑1916209 | Consideration of Compliance Check in CHO | LG Electronics Inc. | imported from 3GU |
R2‑1916210 | Handling Excess of UE Capability in DAPS HO | LG Electronics Inc. | imported from 3GU |
R2‑1916211 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) | LG Electronics Inc | imported from 3GU |
R2‑1916212 | Padding Removal and Feedback for Context Establishment | China Telecommunications | imported from 3GU |
R2‑1916213 | AS-layer configuration failure case in SL unicast | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1916214 | MAC PDU handling for Sidelink UE capabilities and Sidelink RRC reconfiguration | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1916215 | Remaining issues on reselection priority handlings for V2X | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1916216 | Interaction between RRC Connection Resume Condition and RNAU for NR V2X SL Communication | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1916217 | Discussion on SL-RSRP reporting | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1916218 | Remaining Issues on Handling of SLRB configuration handling | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1916219 | UE Assistance for Release Request | Samsung | imported from 3GU |
R2‑1916220 | SLRB Reconfiguration Handling | Samsung | imported from 3GU |
R2‑1916221 | Transmission of Deprioritized Data by Retransmission Grant | Samsung | imported from 3GU |
R2‑1916222 | Split Bearer Fallback at Deactivation of PDCP Duplication | Samsung | imported from 3GU |
R2‑1916223 | Configuration and Initial State of PDCP Duplication | Samsung | imported from 3GU |
R2‑1916224 | Fast failure recovery in CHO | Samsung R&D Institute India | imported from 3GU |
R2‑1916225 | Cell Reselection remaining issues | Samsung R&D Institute India | imported from 3GU |
R2‑1916226 | CHO UE behaviour upon transitioning to RRC_INACTIVE/RRC_IDLE | Samsung R&D Institute India | imported from 3GU |
R2‑1916227 | Single stack eMOB solution for NR | Samsung R&D Institute India | imported from 3GU |
R2‑1916228 | Email discussion report [107bis#90] Further details on “m” operation for PUR | Qualcomm Incorporated | imported from 3GU |
R2‑1916229 | TP for TA validation based on serving cell RSRP change (related to RAN4 LSes) | Qualcomm Incorporated | imported from 3GU |
R2‑1916230 | CG/SPS alignment on Resource Boundary Pattern | Sequans Communications | imported from 3GU |
R2‑1916231 | Impact of CG/SPS with periodicities non dividing HF length | Sequans Communications | imported from 3GU |
R2‑1916232 | UE autonomous retransmission in a CG resource | Sequans Communications | imported from 3GU |
R2‑1916233 | Enhanced rescheduling for dropped CG | Sequans Communications | imported from 3GU |
R2‑1916234 | On Inter-RAT assistance information for NB-IoT and LTE(-eMTC) | Sequans Communications | imported from 3GU |
R2‑1916235 | NB-IoT UE Specific DRX - Backward Compatibility | Sequans Communications | imported from 3GU |
R2‑1916236 | NB-IoT UE Specific DRX - Efficiency Issues | Sequans Communications | imported from 3GU |
R2‑1916237 | Support for LTE deployment at IAB node sites | Sequans Communications | imported from 3GU |
R2‑1916238 | F1-U Flow Control and Reordering Issues | Sequans Communications | imported from 3GU |
R2‑1916239 | Packet Marking for E2E Flow Control | Sequans Communications | imported from 3GU |
R2‑1916240 | Discussion on Earth fixed vs. Earth moving cells in NTN LEO | Nokia, Nokia Shanghai Bell, Thales | imported from 3GU |
R2‑1916241 | UE positioning requirements and solution analysis in NTN | Nokia, Nokia Shanghai Bell, Thales | imported from 3GU |
R2‑1916242 | Pre-trigger based mechanism for NTN connected mode mobility enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916243 | RRC message for source and target configuration | SHARP Corporation | imported from 3GU |
R2‑1916244 | CR to 38.306 on DRX-based intra-frequency SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R2‑1916245 | CR to 38.331 on DRX-based intra-frequency SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R2‑1916246 | Remaining issues on CLI | Ericsson | imported from 3GU |
R2‑1916247 | DRX considerations and RAN paging for PUR | Sequans Communications | imported from 3GU |
R2‑1916248 | Padding removal | Nokia, Nokia Shanghai Bell, vivo, OPPO, Mediatek, Samsung, Sony, Intel, ZTE, NTT Docomo | imported from 3GU |
R2‑1916249 | TP for TS36.302 on ETSW/CMAS in connected mode for non-BL UE in CE | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R2‑1916250 | Way forward on BAP Configuration | Futurewei | imported from 3GU |
R2‑1916251 | Enhancements for PUR | Sequans Communications | imported from 3GU |
R2‑1916252 | Power and signalling savings at TAT expiry and reaching sr-TransMax | Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916253 | Allowing PDCP version change without handover | Ericsson | imported from 3GU |
R2‑1916254 | Issue on ping pong state transition for sidelink UE | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1916255 | Discussion on resource allocation | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1916256 | Discussion on the use case of CHO failure recovery | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1916257 | Discussion on BSR prioritization issue | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1916258 | [DRAFT] LS on CLI measurements UE capabilities | Qualcomm Incorporated | imported from 3GU |
R2‑1916259 | Discussion on eMIMO MAC CE | vivo | imported from 3GU |
R2‑1916260 | Access control differentiation for IMS registration related signaling | Intel Corporation | imported from 3GU |
R2‑1916261 | Different Access Control Treatment for IMS signaling in EPS | Intel Corporation | imported from 3GU |
R2‑1916262 | Security Algorithms for Radio Bearers | Qualcomm Incorporated | imported from 3GU |
R2‑1916263 | Remaining issues of SL Prioritization | MediaTek Inc. | imported from 3GU |
R2‑1916264 | UE Behavior Clarification during UE States Transition | CATT | imported from 3GU |
R2‑1916265 | Comparison of different PSCell modelling options for SCG suspension | Qualcomm Incorporated | imported from 3GU |
R2‑1916266 | Running 38.331 CR for NR_L1enh_URLLC | Huawei, HiSilicon | imported from 3GU |
R2‑1916267 | Proposal for 2-bit downlink channel quality reporting in MSG3 for eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1916268 | Forwarding of Reply LS on GUTI allocation for 5G CIoT (C1-198560; contact: Qualcomm) | CT1 | imported from 3GU |
R2‑1916269 | RA Prioritization for MPS for 2-step RACH | Perspecta Labs, CISA ECD, AT&T, T-Mobile, Sprint, Verizon, Ericsson, Qualcomm | imported from 3GU |
R2‑1916270 | Clarification on crossCarrierScheduling-OtherSCS in R15 | OPPO | imported from 3GU |
R2‑1916271 | Clarification on crossCarrierScheduling-OtherSCS in R15 | OPPO | imported from 3GU |
R2‑1916272 | Running CR for the introduction of SRVCC from 5G to 3G | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1916273 | Main issues remaining for Conditional SN initiated SN change | Samsung Telecommunications | imported from 3GU |
R2‑1916274 | On Maximum Number of CHO Candidate Cells and Nodes | Charter Communications, Inc | imported from 3GU |
R2‑1916275 | Reply LS on NR V2X Security for user plane data and PDCP SN size (S3-193854; contact: LGE) | SA3 | imported from 3GU |
R2‑1916276 | The Reporting of CHO failure | CMCC | imported from 3GU |
R2‑1916277 | Alternative solution for “under-reporting” CSI-RS capabilities | NTT DOCOMO, INC. | imported from 3GU |
R2‑1916278 | Impacts of PDCCH-WUS on RRC | CATT | imported from 3GU |
R2‑1916279 | Session notes from NTN offline discussion | THALES | imported from 3GU |
R2‑1916280 | LS on further aspects of Mission Critical Services over 5MBS (S6-192404; contact: AT&T) | SA6 | imported from 3GU |
R2‑1916281 | Report from session on LTE legacy, LTE TEI16 and NR/LTE Rel-16 Mobility | Vice Chairman (Nokia) | imported from 3GU |
R2‑1916282 | Report from Break-Out Session on SRVCC, CLI, PRN, eMIMO, RACS | Vice Chairman (ZTE) | imported from 3GU |
R2‑1916283 | Report eMTC breakout session | Session chair (Ericsson) | imported from 3GU |
R2‑1916284 | Session minutes for NR-U, Power Savings, NTN and 2-step RACH | Session chair (InterDigital) | imported from 3GU |
R2‑1916285 | Report from session on Rel-15 and 16 LTE and NR positioning | Session chair (MediaTek) | imported from 3GU |
R2‑1916286 | Report from SOM/MDT session | Session chair (CMCC) | imported from 3GU |
R2‑1916287 | Report NB-IoT breakout session | Session chair (Huawei) | imported from 3GU |
R2‑1916288 | Report from session on LTE V2X and NR V2X | Session chair (Samsung) | imported from 3GU |
R2‑1916289 | LS on GUTI allocation for MT-EDT in 5G CIoT (C1-199005; contact: Huawei) | CT1 | imported from 3GU |
R2‑1916290 | LS on enhanced access control for IMS signalling (C1-199007; contact: NTT DOCOMO) | CT1 | imported from 3GU |
R2‑1916291 | Reply LS on assistance indication for WUS (C1-199008; contact) | CT1 | imported from 3GU |
R2‑1916292 | LS on Extended NAS timers for Coverage Enhancement in 5GS (C1-199034; contact: Ericsson) | CT1 | imported from 3GU |
R2‑1916293 | CR of TS 36.355 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | imported from 3GU |
R2‑1916294 | CR of TS 36.331 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | imported from 3GU |
R2‑1916295 | Discussion on PDCCH-WUS missing problems during BWP switching and handover | Xiaomi Communications | imported from 3GU |
R2‑1916296 | Correction to Pcompensation for FR2 | Huawei, HiSilicon | imported from 3GU |
R2‑1916297 | IAB remaining issues | Qualcomm Incorporated (Rapporteur) | imported from 3GU |
R2‑1916298 | WF on UL BAP routing ID | Qualcomm Incorporated (Rapporteur) | imported from 3GU |
R2‑1916299 | Discussion on PRACH coordination | CATT | imported from 3GU |
R2‑1916300 | Report on Email Discussion [107b#52][NR MobE] Open issues Conditional PSCell addition/change | CATT | imported from 3GU |
R2‑1916301 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916302 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916303 | Correction to SIB5 acquisition for idle mode measurements | Ericsson | imported from 3GU |
R2‑1916304 | Correction on inter-frequency neighbour cell measurements | Ericsson | imported from 3GU |
R2‑1916305 | Correction to SIB5 acquisition for idle mode measurements | Ericsson | imported from 3GU |
R2‑1916306 | Clarification on sCellIndex and SCell lists | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R2‑1916307 | Clarification on sCellIndex and SCell lists | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R2‑1916308 | Clarification on sCellIndex and SCell lists | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R2‑1916309 | Correction on handling of stored AS context for UP optimization and RRC_INACTIVE state | Huawei, HiSilicon | imported from 3GU |
R2‑1916310 | Miscellaneous corrections | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1916311 | Correction to full configuration | Google Inc. | imported from 3GU |
R2‑1916312 | Correction to early measurement reporting results | Ericsson | imported from 3GU |
R2‑1916313 | Clarification on UE Inactive AS context | Google Inc. | imported from 3GU |
R2‑1916314 | [DRAFT] Reply LS on support of high peak data rate for Cat-M1 Ues in HD-FDD | Qualcomm Incorporated | imported from 3GU |
R2‑1916315 | [DRAFT] reply LS on QoE Measurement Collection | Ericsson | imported from 3GU |
R2‑1916316 | Correction on non-3GPP paging | Huawei, HiSilicon | imported from 3GU |
R2‑1916317 | Introduction of DL MIMO efficiency enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1916318 | Introduction of DL MIMO efficiency enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1916319 | Draft CR for 36.323 on supporting DAPS handover | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1916320 | Report of [offline 106] UE capability on NR<E mobility | Intel Corporation | imported from 3GU |
R2‑1916321 | Report on Offline Discussion [108] agreeable proposals on Conditional PSCell Addition/Change | CATT | imported from 3GU |
R2‑1916322 | Report of [Offline 109] Release of measID for CHO | Ericsson | imported from 3GU |
R2‑1916323 | Clarification on sCellIndex and SCell lists | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R2‑1916324 | Correction to full configuration | Google Inc. | imported from 3GU |
R2‑1916325 | Correction to early measurement reporting results | Ericsson | imported from 3GU |
R2‑1916326 | [DRAFT] reply LS on QoE Measurement Collection | Ericsson | imported from 3GU |
R2‑1916327 | Reply LS on support of high peak data rate for Cat-M1 Ues in HD-FDD | RAN2 | imported from 3GU |
R2‑1916328 | Reply LS on QoE Measurement Collection | RAN2 | imported from 3GU |
R2‑1916329 | Report on Offline Discussion [108] agreeable proposals on Conditional PSCell Addition/Change | CATT | imported from 3GU |
R2‑1916330 | LS on Conditional PSCell addition/change | RAN3 | imported from 3GU |
R2‑1916331 | Introduction of cross link interfernce management | Huawei, HiSilicon | imported from 3GU |
R2‑1916332 | [DRAFT] LS on CLI measurements UE capabilities | Qualcomm Incorporated | imported from 3GU |
R2‑1916333 | Running CR for the introduction of SRVCC from 5G to 3G | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1916334 | Running CR for the introduction of SRVCC from 5G to 3G | China Unicom, Huawei, HiSilicon | imported from 3GU |
R2‑1916335 | Introduction of SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1916336 | [DRAFT] Reply LS on NID structure and length | Ericsson | imported from 3GU |
R2‑1916337 | NPN Stage 2 Draft CR | Nokia (Rapporteur) | imported from 3GU |
R2‑1916338 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) | LG Electronics Inc | imported from 3GU |
R2‑1916339 | Running RRC CR for Introduction of NR eMIMO | Ericsson | imported from 3GU |
R2‑1916340 | Introduction of cross link interfernce management | Huawei, HiSilicon, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1916341 | [Draft] CMAS/ETWS and emergency services for SNPNs | Qualcomm | imported from 3GU |
R2‑1916342 | Report of Offline Discussion 211 (CATT) | CATT (Rapporteur) | imported from 3GU |
R2‑1916343 | Running RRC CR for Introduction of NR eMIMO | Ericsson | imported from 3GU |
R2‑1916344 | Reply LS on NID structure and length | RAN2 | imported from 3GU |
R2‑1916345 | CMAS/ETWS and emergency services for SNPNs | RAN2 | imported from 3GU |
R2‑1916346 | Draft Reply LS on Sending CAG ID in NAS layer | Qualcomm Incorporated | imported from 3GU |
R2‑1916347 | Introduction of cross link interfernce management | Huawei, HiSilicon | imported from 3GU |
R2‑1916348 | LS on CLI measurements UE capabilities | RAN2 | imported from 3GU |
R2‑1916349 | Reply LS on Sending CAG ID in NAS layer | RAN2 | imported from 3GU |
R2‑1916350 | Miscellaneous non-controversial corrections Set IV | Ericsson | imported from 3GU |
R2‑1916351 | (reserved) | THALES | imported from 3GU |
R2‑1916352 | MAC Running CR for NR IIOT | Samsung R&D Institute UK | imported from 3GU |
R2‑1916353 | Correction to channelBWs | Ericsson | imported from 3GU |
R2‑1916354 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1916355 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1916356 | Clarification on default configuration and SRB1 for UP-EDT | Huawei, HiSilicon | imported from 3GU |
R2‑1916357 | [DRAFT] Reply LS on Mobile-terminated Early Data Transmission | Qualcomm Incorporated | imported from 3GU |
R2‑1916358 | [DRAFT] LS on UE identifier for UP CIoT 5GS Optimisation | LGE | imported from 3GU |
R2‑1916359 | Summary of [CB Offline #303] on HARQ RTT timer length | Huawei, HiSilicon | imported from 3GU |
R2‑1916360 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916361 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916362 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916363 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916364 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916365 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916366 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916367 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916368 | Reply LS on Mobile-terminated Early Data Transmission | RAN2 | imported from 3GU |
R2‑1916369 | LS on UE identifier for UP CIoT 5GS Optimisation | RAN2 | imported from 3GU |
R2‑1916370 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1916371 | Draft LS on consistent Uplink LBT failure detection mechanism | Qualcomm Incorporated | imported from 3GU |
R2‑1916372 | Summary of offline 404 discussion | Qualcomm Incorporated | imported from 3GU |
R2‑1916373 | [Draft] Reply LS on UE higher layer signalling for cross-slot scheduling | MediaTek Inc. | imported from 3GU |
R2‑1916374 | Running CR for Introduction of Rel-16 NR UE power saving in TS 38.321 | Huawei | imported from 3GU |
R2‑1916375 | LS on RRM Measurement Relaxation for UE Power Saving in NR | RAN2 | imported from 3GU |
R2‑1916376 | [107bis#66][NR/NTN] Running TP (Thales) | THALES | imported from 3GU |
R2‑1916377 | [DRAFT] LS on dependencies on AS design for mobility management aspects of NTN in 5GS | Thales | imported from 3GU |
R2‑1916378 | [DRAFT] LS on LS on system level design assumptions for satellite in 5GS | Thales | imported from 3GU |
R2‑1916379 | Inputs to TR 38.821 recommendations | THALES, Nomor, Nokia, Vodafone, Mediatek | imported from 3GU |
R2‑1916380 | LS on consistent Uplink LBT failure detection mechanism | RAN2 | imported from 3GU |
R2‑1916381 | Summary of offline 404 discussion | Qualcomm Incorporated | imported from 3GU |
R2‑1916382 | Report of offline-403 - Remaining issues of consistent UL LBT failure | OPPO | imported from 3GU |
R2‑1916383 | DRX adaptions for NTN | Ericsson, Nomor Research GmbH, THALES | imported from 3GU |
R2‑1916384 | UE positioning requirements and solution analysis in NTN | Nokia, Nokia Shanghai Bell, Thales | imported from 3GU |
R2‑1916385 | Discussion on Earth fixed vs. Earth moving cells in NTN LEO | Nokia, Nokia Shanghai Bell, Thales | imported from 3GU |
R2‑1916386 | TP on Feeder Link Switch | CATT, Huawei, HiSilicon | imported from 3GU |
R2‑1916387 | Service continuity between TN and NTN | NEC | imported from 3GU |
R2‑1916388 | Remaining details on Random access for NTN | Ericsson | imported from 3GU |
R2‑1916389 | Satellite type differentiation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916390 | CHO for NTN LEO | Ericsson | imported from 3GU |
R2‑1916391 | Report of email discussion [107bis#67] [NR - NTN] | Ericsson | imported from 3GU |
R2‑1916392 | TP on RACH capacity calculation based on typical cell size | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1916393 | CHO for NTN LEO | Ericsson | imported from 3GU |
R2‑1916394 | LS on dependencies on AS design for mobility management aspects of NTN in 5GS | RAN2 | imported from 3GU |
R2‑1916395 | LS on LS on system level design assumptions for satellite in 5GS | RAN2 | imported from 3GU |
R2‑1916396 | Inputs to TR 38.821 recommendations | THALES, Nomor, Nokia, Vodafone, Mediatek | imported from 3GU |
R2‑1916397 | Inputs to TR 38.821 recommendations | THALES, Nomor, Nokia, Vodafone, Mediatek | imported from 3GU |
R2‑1916398 | Correction to PHR in dual connectivity | Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1916399 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1916400 | Clarification regarding QoS handling in MRDC with 5G CN | Samsung Telecommunications | imported from 3GU |
R2‑1916401 | UE capability on NR positioning | Intel Corporation | imported from 3GU |
R2‑1916402 | [Report of Offline#502] | Ericsson | imported from 3GU |
R2‑1916403 | Summary of Offline discussion #503 on whether to have one method or follow the existing LTE structure | CATT | imported from 3GU |
R2‑1916404 | [Report of Offline#504] | Ericsson | imported from 3GU |
R2‑1916405 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | imported from 3GU |
R2‑1916406 | CR of TS 36.355 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | imported from 3GU |
R2‑1916407 | CR of TS 36.331 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | imported from 3GU |
R2‑1916408 | CR of TS 36.305 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1916409 | SSR Phase Bias Positioning Modes for Stage 2 | Swift Navigation | imported from 3GU |
R2‑1916410 | SSR Phase Bias Positioning Modes for Stage 2 | Swift Navigation | imported from 3GU |
R2‑1916411 | Introducing support for GNSS Integer Ambiguity Level Indications | Ericsson | imported from 3GU |
R2‑1916412 | Introducing support for GNSS Integer Ambiguity Level Indications | Ericsson | imported from 3GU |
R2‑1916413 | Missing RACH aspect for DC | Nokia, Nokia Shanghai Bell, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1916414 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1916415 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1916416 | [DRAFT] LS on trace related configurations for NR MDT | Huawei | imported from 3GU |
R2‑1916417 | [DRAFT] LS on EN-DC related MDT configuration details | Ericsson | imported from 3GU |
R2‑1916418 | [DRAFT]LS on Logged Measurements | CMCC | imported from 3GU |
R2‑1916419 | RAN2-108#661 offline discussion on SON functions | Ericsson | imported from 3GU |
R2‑1916420 | [DRAFT] LS on RACH report and RLF report | Ericsson | imported from 3GU |
R2‑1916421 | Clarification of PDCCH monitoring when not fully aligned with PDCCH periods | NTT DOCOMO INC. | imported from 3GU |
R2‑1916422 | Stop using redirectedCarrierOffsetDedicated after reselection to another frequency | Huawei, HiSilicon | imported from 3GU |
R2‑1916423 | Allow Delta Configuration of ParametersListFmt2 and ParametersListEDTFmt2 in SIB2-NB | MediaTek Inc., ZTE Corporation, Sanechips, Huawei, HiSilicon | imported from 3GU |
R2‑1916424 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | Blackberry | imported from 3GU |
R2‑1916425 | [DRAFT] LS on PUR Fallback | Qualcomm | imported from 3GU |
R2‑1916426 | Draft LS reply PUR transmission for NB-IoT/eMTC | Ericsson | imported from 3GU |
R2‑1916427 | Alternative TP for TA validation based on serving cell RSRP change (related to RAN4 LSes) | Sierra Wireless | imported from 3GU |
R2‑1916428 | [Report from Offline discussion #700] | Qualcomm | imported from 3GU |
R2‑1916429 | [Report from Offline discussion #701] | Qualcomm | imported from 3GU |
R2‑1916430 | Offline discussion #702 (Qualcomm) To discuss the configuration details and agree way forward | Qualcomm Incorporated | imported from 3GU |
R2‑1916431 | Report of [Offline#705] Further progress on PUR | Ericsson (Rapporteur) | imported from 3GU |
R2‑1916432 | Report of [Offline#706] whether to re-use SIB14-NB or have new SIB for UAC | Huawei (Rapporteur) | imported from 3GU |
R2‑1916433 | [DRAFT] Reply LS on assistance indication for WUS | Qualcomm Incorporated | imported from 3GU |
R2‑1916434 | [DRAFT] Feedback on RAN1 agreements on PUR | Qualcomm | imported from 3GU |
R2‑1916435 | LS reply PUR transmission for NB-IoT/eMTC | RAN2 | imported from 3GU |
R2‑1916436 | [DRAFT] Reply LS on assistance indication for WUS | Qualcomm Incorporated | imported from 3GU |
R2‑1916437 | Feedback on RAN1 agreements on PUR | RAN2 | imported from 3GU |
R2‑1916438 | [DRAFT] Reply LS on assistance indication for WUS | Qualcomm Incorporated | imported from 3GU |
R2‑1916439 | Clarification of PDCCH monitoring when not fully aligned with PDCCH periods | NTT DOCOMO INC. | imported from 3GU |
R2‑1916440 | Reply LS on assistance indication for WUS | RAN2 | imported from 3GU |
R2‑1916441 | Reply LS on signalling of sidelink RSRP and CSI | RAN2 | imported from 3GU |
R2‑1916442 | [DRAFT] Response LS on SL RLM/RLF | InterDigital | imported from 3GU |
R2‑1916443 | [DRAFT] Response LS on additional high layer information for sidelink physical layer operations | LGE | imported from 3GU |
R2‑1916444 | [DRAFT] Reply LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication | Ericsson | imported from 3GU |
R2‑1916445 | [DRAFT] Reply LS on sidelink synchronization under multiple synchronization sources with different timing | Qualcomm | imported from 3GU |
R2‑1916446 | [DRAFT] Reply LS on PC5S and PC5 RRC unicast message protection | Qualcomm Incorporated | imported from 3GU |
R2‑1916447 | Offline discussion on open issues of V2X 38.331 running CR | Huawei | imported from 3GU |
R2‑1916448 | [DRAFT] Response LS on TX resource (re-)selection and MAC related agreements | LGE | imported from 3GU |
R2‑1916449 | Running CR for 38.322 for NR V2X | Ericsson | imported from 3GU |
R2‑1916450 | [Results of Offline#810] | OPPO | imported from 3GU |
R2‑1916451 | [Discussion on remaining prioritization issues] | OPPO | imported from 3GU |
R2‑1916452 | Summary of offline [Offline-812] on HFN part of RX_NEXT and RX_DELIV | CATT | imported from 3GU |
R2‑1916453 | [DRAFT] LS on NR V2X Security issue and PDCP SN size | CATT | imported from 3GU |
R2‑1916454 | Summary of offline [814] on sidelink transmissions during handover or Uu Phy layer problems | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916455 | Summary on Offline [815] SL Synchronization under Async eNB(s)/gNB(s) | Apple | imported from 3GU |
R2‑1916456 | Open issues on V2X 38.322 running CR | Ericsson | imported from 3GU |
R2‑1916457 | Reply LS on signalling of sidelink RSRP and CSI | RAN2 | imported from 3GU |
R2‑1916458 | Response LS on additional high layer information for sidelink physical layer operations | RAN2 | imported from 3GU |
R2‑1916459 | Reply LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication | RAN2 | imported from 3GU |
R2‑1916460 | Response LS on TX resource (re-)selection and MAC related agreements | RAN2 | imported from 3GU |
R2‑1916461 | Reply LS on PC5S and PC5 RRC unicast message protection | RAN2 | imported from 3GU |
R2‑1916462 | [DRAFT] Reply LS on UL-SL prioritization | OPPO | imported from 3GU |
R2‑1916463 | [DRAFT] LS on NR V2X Security issue and PDCP SN size | CATT | imported from 3GU |
R2‑1916464 | Response LS on SL RLM/RLF | RAN2 | imported from 3GU |
R2‑1916465 | Reply LS on sidelink synchronization under multiple synchronization sources with different timing | RAN2 | imported from 3GU |
R2‑1916466 | [DRAFT] Reply LS on UL-SL prioritization | OPPO | imported from 3GU |
R2‑1916467 | LS on NR V2X Security issue and PDCP SN size | RAN2 | imported from 3GU |
R2‑1916468 | Reply LS on UL-SL prioritization | RAN2 | imported from 3GU |
R2‑1916469 | Ericsson (Email discussion rapporteur) | Ericsson LM | imported from 3GU |
R2‑1916470 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1916471 | Correction on sending Failure Information via SRB3 | Ericsson, ZTE Corporation (Rapporteur), Huawei | imported from 3GU |
R2‑1916472 | Running stage 2 CR on positioning (^^[107bis#78][NR Pos] ) | Intel Corporation, ESA | imported from 3GU |
R2‑1916473 | SMTC setting in MR-DC PSCell change | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916474 | Correction to integrity protection in DRB addition and modification | Ericsson | imported from 3GU |
R2‑1916475 | CR to 36.331 on performing L3 filtering for NR related measurements | Ericsson | imported from 3GU |
R2‑1916476 | Corrections on scg-RB-Config in CG-Config | Ericsson | imported from 3GU |
R2‑1916477 | Draft LS to RAN1 for clarification of PUCCH configuration | RAN2 | imported from 3GU |
R2‑1916478 | Broadcast Positioning Procedure in Connected Mode | CATT | imported from 3GU |
R2‑1916479 | Correction on the condition of RBTermChange | Ericsson | imported from 3GU |
R2‑1916480 | Correction on the configuration of split SRB | Huawei, HiSilicon, Samsung | imported from 3GU |
R2‑1916481 | LS to RAN1 for clarification of PUCCH configuration | RAN2 | imported from 3GU |
R2‑1916482 | LS on Discussion over UE capabilities of FG2-36/2-40/2-41/2-43 (R1-1913295; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1916483 | Correction to key derivation for the UE configured with sk-counter | Huawei, HiSilicon | imported from 3GU |
R2‑1916484 | Correction on the pre-condition for reconfiguration with sync of SCG | Huawei, HiSilicon | imported from 3GU |
R2‑1916485 | Restoring RoHC/SDAP during Resume | Intel | imported from 3GU |
R2‑1916486 | Security requirements for split PDU session (38.331) | Ericsson, Qualcomm | imported from 3GU |
R2‑1916487 | Additional path reporting for downlink NR positioning measurements | Ericsson, T-Mobile, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Polaris Wireless | imported from 3GU |
R2‑1916488 | Definition of NR standalone | Ericsson | imported from 3GU |
R2‑1916489 | Correction of UE assistance information | Samsung Telecommunications | imported from 3GU |
R2‑1916490 | Correction of UE assistance information | Samsung Telecommunications | imported from 3GU |
R2‑1916491 | Correction on SIB1 description | Huawei, HiSilicon | imported from 3GU |
R2‑1916492 | IAB flow control feedback info | Qualcomm Incorporated | imported from 3GU |
R2‑1916493 | Clarification regarding inter-node transfer of UE capability containers | Samsung Telecommunications | imported from 3GU |
R2‑1916494 | Miscellaneous correction for late drop | Ericsson | imported from 3GU |
R2‑1916495 | [107bis#34]Correction on ambiguity of UE FDD&TDD FR1&FR2 capabilities | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1916496 | [DRAFT] LS on default codebook parameters | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916497 | Issue related to CG overridden by PDCCH | ASUSTeK | imported from 3GU |
R2‑1916498 | Report for [107bis#36] [NR R15] FR2 CA Fallbacks (Nokia) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916499 | Report of Offline#26, absence of scs-XXkHz in channelBWs-DL/UL | Ericsson | imported from 3GU |
R2‑1916500 | CR to 38.331 on support of 70MHz channel bandwidth -option1 with IODT bit | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1916501 | CR to 38.306 on support of 70MHz channel bandwidth -option1 with IODT bit | Huawei, HiSilicon, Vodafone | imported from 3GU |
R2‑1916502 | Use of splitSRB-WithOneUL-Path capability (38.306) | Ericsson | imported from 3GU |
R2‑1916503 | [DRAFT] LS on Uplink skipping | vivo | imported from 3GU |
R2‑1916504 | Upper layer parameters to support IAB physical layer operation | Qualcomm (Rapporteur) | imported from 3GU |
R2‑1916505 | TP on Random Access procedure | CATT, Thales, OPPO, Spreadtrum Communications, Nomor Research GmbH | imported from 3GU |
R2‑1916506 | F1AP signalling over LTE leg way forward | Nokia, Nokia Shanghai Bell, AT&T, KDDI | imported from 3GU |
R2‑1916507 | Miscellaneous corrections on UE capability fields | Intel Corporation | imported from 3GU |
R2‑1916508 | Measurement Initiation Issue for NTN System | CATT, Thales | imported from 3GU |
R2‑1916509 | [DRAFT] LS on secondary DRX group | Ericsson | imported from 3GU |
R2‑1916510 | Correction of cell reselection parameters for multi-beam operation | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1916511 | Offline 34, IAB bootstrap configuration | Qualcomm Incorporated (Rapporteur) | imported from 3GU |
R2‑1916512 | Motivation for a dedicated mechanism for misaligned periodicities handling | Nokia, Nokia Shanghai Bell, Sequans, Fujitsu | imported from 3GU |
R2‑1916513 | Handling of AS-Config in HandoverPreparationInformation | Ericsson | imported from 3GU |
R2‑1916514 | Correction of SRB3 handling at full configuration (Alt2) | Ericsson | imported from 3GU |
R2‑1916515 | Reply LS on Fast MCG Link Recovery using SRB3 (R3-197606; contact: ZTE) | RAN3 | imported from 3GU |
R2‑1916516 | Reply LS on Recommended Bit Rate/Query for FLUS and MTSI | RAN2 | imported from 3GU |
R2‑1916517 | Reply LS on direct indication of ETWS/CMAS (R1-1913367; contact: Futurewei) | RAN1 | imported from 3GU |
R2‑1916518 | Running CR for 36.300 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1916519 | Running CR for 38.300 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1916520 | Reply LS on Sending CAG ID in NAS layer (R3-197591; contact: Ericsson) | RAN3 | imported from 3GU |
R2‑1916521 | Measurement Initiation Issue for NTN System | CATT, Thales | imported from 3GU |
R2‑1916522 | Running CR on 38.331 for on-demand SI procedure in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1916523 | Correction to Feature Set Combination and Band combination list for NR-DC (38.331) | Ericsson | imported from 3GU |
R2‑1916524 | [DRAFT] LS on measurement reporting criteria for EN-DC | Nokia | imported from 3GU |
R2‑1916525 | Correction on MCG measurements in SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1916526 | Summary of Offline 52: TP for LCH-priority based Data-Data and SR-Data prioritization | Samsung | imported from 3GU |
R2‑1916527 | [Summary of] Offline 53, CG/SPS configuration and MAC CE for confirmation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916528 | Reply LS on CSI-RS configuration transfer | RAN2 | imported from 3GU |
R2‑1916529 | Restoring RoHC/SDAP during INACTIVe Resume | Intel | imported from 3GU |
R2‑1916530 | LS on RRC establishment cause value in EPS voice fallback from NR to E-UTRAN | RAN2 | imported from 3GU |
R2‑1916531 | Summary of offline #40 on UE autonomous (re)transmission | CATT | imported from 3GU |
R2‑1916532 | Offline discussion about Power control for NR-DC | vivo | imported from 3GU |
R2‑1916533 | Summary of Offline discussion #503 on whether to have one method or follow the existing LTE structure | CATT | imported from 3GU |
R2‑1916534 | Correction on security key derivation | Ericsson | imported from 3GU |
R2‑1916535 | Correction on security key derivation | Ericsson | imported from 3GU |
R2‑1916536 | Reply LS on SL RLM/RLF (R1-1913464; contact: InterDigital) | RAN1 | imported from 3GU |
R2‑1916537 | Way forward and TP for the pre-BSR | Huawei, HiSilicon | imported from 3GU |
R2‑1916538 | TP for Timing Delta MAC CE | ZTE | imported from 3GU |
R2‑1916539 | Running CR to 38.321 on Integrated Access and Backhaul for NR | Samsung Electronics GmbH | imported from 3GU |
R2‑1916540 | [DRAFT] LS on F1AP over LTE leg signalling for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916541 | LS on UE capabilities and RRC signalling on Tx switching period delay (R4-1916083; contact: Apple) | RAN4 | imported from 3GU |
R2‑1916542 | LS on UE capability of intraBandENDC-Support (R4-1913130; Qualcomm) | RAN4 | imported from 3GU |
R2‑1916543 | [DRAFT] LS on inter-RAT HO from SA to EN-DC | China Telecom | imported from 3GU |
R2‑1916544 | [Draft] LS on Network Coordination for UL PDCP Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916545 | NE-DC dynamic power sharing capability | Qualcomm Incorporated | imported from 3GU |
R2‑1916546 | Correction on initial BWP bandwidth capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑1916547 | Need for Ethernet padding compression | RAN2 | imported from 3GU |
R2‑1916548 | Stage 2 CR for Inter-RAT HO between NR to EN-DC in Rel-16 | China Telecommunications, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | imported from 3GU |
R2‑1916549 | Corrections on the PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1916550 | Clarification for PDCP duplication (de)activation by RRC | Huawei | imported from 3GU |
R2‑1916551 | Correction on PRACH procedure with SRS switching | Huawei, HiSilicon | imported from 3GU |
R2‑1916552 | Correction on CORESET location | Huawei, HiSilicon | imported from 3GU |
R2‑1916553 | Work plan for Industrial IoT WI finalization | Nokia (Rapporteur) | imported from 3GU |
R2‑1916554 | Text Proposal for TS 36.331 for support of F1AP signalling over LTE leg | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1916555 | TP on Feeder Link Switch | CATT, Huawei, HiSilicon | imported from 3GU |
R2‑1916556 | PSCell MIB configuration in MR-DC | MediaTek Inc. | imported from 3GU |
R2‑1916557 | Corrections on the PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1916558 | Report of offline discussion #202 | LG Electronics Inc | imported from 3GU |
R2‑1916559 | [DRAFT] LS on Additional frequency information for SRS RSRP resource configuration | LGE | imported from 3GU |
R2‑1916560 | PDCP configuration generation (email discussion of 107#25) | Huawei, HiSilicon | imported from 3GU |
R2‑1916561 | Check RAN1 impacts of UE autonomous transmission of de-prioritized CG PDU | Qualcomm Incorporated | imported from 3GU |
R2‑1916562 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916563 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916564 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916565 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916566 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916567 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916568 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916569 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916570 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1916571 | [107bis#34]Correction on ambiguity of UE FDD&TDD FR1&FR2 capabilities | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1916572 | LS on Uplink skipping | RAN2 | imported from 3GU |
R2‑1916573 | Draft CR to 36.331 on Integrated Access and Backhaul for (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1916574 | Running CR to TS 38.331 on IAB for NR | Ericsson | imported from 3GU |
R2‑1916575 | [DRAFT] LS on introduction of additional CG periodicities | Nokia | imported from 3GU |
R2‑1916576 | LS on Network Coordination for UL PDCP Duplication | RAN2 | imported from 3GU |
R2‑1916577 | LS on F1AP over LTE leg signalling for IAB | RAN2 | imported from 3GU |
R2‑1916578 | LS on channel raster for NR V2X UE (R4-1916146; contact: CATT) | RAN4 | imported from 3GU |
R2‑1916579 | LS on EN-DC related MDT configuration details | RAN2 | imported from 3GU |
R2‑1916580 | LS on RACH report and RLF report | RAN2 | imported from 3GU |
R2‑1916581 | Offline discussion summary of UL dormancy behaviour | Qualcomm Incorporated | imported from 3GU |
R2‑1916582 | Offline discussion [#45] cross-carrier scheduling CR | Qualcomm Incorporated | imported from 3GU |
R2‑1916583 | CR to 38.331 on support of cross-carrier scheduling with different numerology | Qualcomm Incorporated | imported from 3GU |
R2‑1916584 | [Draft] LS on FR2 gap timing impacts of async CA | Qualcomm Incorporated | imported from 3GU |
R2‑1916585 | LS reply on CSI/SRS reporting (R1-1913480; contact: vivo) | RAN1 | imported from 3GU |
R2‑1916586 | Stage 2 CR for Inter-RAT HO between NR to EN-DC in Rel-16 | China Telecommunications, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | imported from 3GU |
R2‑1916587 | [Draft] LS on RAN2 progress on SCell uplink behaviour of the UE in dormancy | Intel | imported from 3GU |
R2‑1916588 | LS on Logged Measurements | RAN2 | imported from 3GU |
R2‑1916589 | Security requirements for split PDU session (38.331) | Ericsson, Qualcomm | imported from 3GU |
R2‑1916590 | [DRAFT] Reply LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 | Ericsson | imported from 3GU |
R2‑1916591 | Running CR on 38.331 for on-demand SI procedure in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1916592 | LS on default codebook parameters | RAN2 | imported from 3GU |
R2‑1916593 | Clarification on ne-DC capability | Huawei, HiSilicon | imported from 3GU |
R2‑1916594 | Clarification on the en-DC and ng-EN-DC capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑1916595 | LS on measurement reporting criteria for EN-DC | RAN2 | imported from 3GU |
R2‑1916596 | Overheating issue in (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1916597 | LS on secondary DRX group | RAN2 | imported from 3GU |
R2‑1916598 | LS on trace related configurations for NR MDT | RAN2 | imported from 3GU |
R2‑1916599 | LS on exchanging used IDs of SN terminated DRBs | RAN2 | imported from 3GU |
R2‑1916600 | LS on inter-RAT HO from SA to EN-DC | RAN2 | imported from 3GU |
R2‑1916601 | LS on RAN2 progress on Scell uplink behaviour of the UE in dormancy | RAN2 | imported from 3GU |
R2‑1916602 | PDCP configuration generation | Huawei, HiSilicon | imported from 3GU |
R2‑1916603 | IP version on X2-U | R3 (Huawei) | imported from 3GU |
R2‑1916604 | Correction to MR-DC with 5GC with RRC_INACTIVE | R3 (Google) | imported from 3GU |
R2‑1916605 | Independent migration to IPv6 on NG-U | R3 (Samsung) | imported from 3GU |
R2‑1916606 | Correction of SN Status Transfer during HO with DC | R3 (Nokia, Nokia Shanghai Bell) | imported from 3GU |
R2‑1916607 | Correction of QoS flow re-mapping before handover | R3 (Ericsson) | imported from 3GU |
R2‑1916608 | CR TS 38.300 Remote Interference Management | R3 (Ericsson, CMCC) | imported from 3GU |
R2‑1916609 | Introduction of Additional RRM Policy Index (ARPI) | R3 (Ericsson, Vodafone, Deutsche Telekom, Verizon Wireless, TIM, AT&T, Orange) | imported from 3GU |
R2‑1916610 | Stage2 Introduction of ARPI&SPID for EN-DC | R3 (ZTE) | imported from 3GU |
R2‑1916611 | DRB ID co-ordination between MN and SN | R3 (Ericsson) | imported from 3GU |
R2‑1916612 | Introduction of direct data forwarding for inter-system HO between EPS and 5GS | R3 (Ericsson, NTT DoCoMo, Samsung, Nokia, Huawei, ZTE, CATT) | imported from 3GU |
R2‑1916613 | Correcting misbehaviors and clean-ups on 37.340 related to PDU session spilt | R3 (Intel Corporation, Nokia, Nokia Shanghai Bell) | imported from 3GU |
R2‑1916614 | Resuming SCG in RRC Resume | R3 (Ericsson) | imported from 3GU |
R2‑1916615 | Stage2 Clarifications for RRC_Inactive with MR-DC@5GC | R3 (ZTE, Qualcomm Incorporated, China Telecom, China Unicom) | imported from 3GU |
R2‑1916616 | Correction of NG connection in MR DC | R3 (Nokia, Nokia Shanghai Bell, Orange) | imported from 3GU |
R2‑1916617 | Correcting misbehaviors and clean-ups on 37.340 related to data forwarding and SN status transfer | R3 (Intel Corporation, CATT, Google) | imported from 3GU |
R2‑1916618 | TS36.300 Removal of Requirement for Exchanging Complete Cell List over X2 | R3 (ZTE, Ericsson, China Unicom) | imported from 3GU |
R2‑1916619 | Clarification on the offered non-GBR resources | R3 (Huawei, Ericsson, China Unicom, CMCC) | imported from 3GU |
R2‑1916620 | LS on LS on system level design assumptions for satellite in 5GS | RAN2 | imported from 3GU |
R2‑1916621 | Response LS on SL RLM/RLF | RAN2 | imported from 3GU |
R2‑1916622 | LS on handover without SN configuration query | RAN2 | imported from 3GU |
R2‑1916623 | Reply LS on extended NAS timers for CE in 5GS | Ericsson | imported from 3GU |
R2‑1916624 | DRB ID co-ordination between MN and SN | Ericsson, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1916625 | Resuming SCG in RRC Resume | Ericsson, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1916626 | Clarification on UE Inactive AS context | Google Inc. | imported from 3GU |
R2‑1916627 | Miscellaneous non-controversial corrections Set IV | Ericsson | imported from 3GU |
R2‑1916628 | Correction on the EUTRAN terminology | Huawei, HiSilicon | imported from 3GU |
R2‑1916629 | Correction to key derivation for the UE configured with sk-counter | Huawei, HiSilicon | imported from 3GU |
R2‑1916630 | Correction to Pcompensation for FR2 | Huawei, HiSilicon | imported from 3GU |
R2‑1916631 | Stage2 Introduction of ARPI&SPID for EN-DC | R3 (ZTE) | imported from 3GU |
R2‑1916632 | Correction of UE assistance information | Samsung Telecommunications | imported from 3GU |
R2‑1916633 | Clarification on security key change and bearer termination point change | ZTE Corporation, Ericsson, Intel | imported from 3GU |
R2‑1916634 | Clarification of NR-DC synchronization | ZTE Corporation | imported from 3GU |
R2‑1916635 | Clarification on the offered non-GBR resources | R3 (Huawei, Ericsson, China Unicom, CMCC) | imported from 3GU |
R2‑1916636 | Draft TS 38.340 (BAP) | Huawei | imported from 3GU |
R2‑1916637 | Support for Non-Public Networks | Nokia (Rapporteur) | imported from 3GU |
R2‑1916638 | Running CR Introduction of 5G V2X with NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1916639 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) | LG Electronics Inc. | imported from 3GU |
R2‑1916640 | Introduction of T312 for PCell and PSCell in NR (Draft) | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | imported from 3GU |
R2‑1916641 | CR to 38.300 on Integrated Access and Backhaul for NR | Qualcomm | imported from 3GU |
R2‑1916642 | Running CR to 37.340 for CA_DC enhancements | vivo, Ericsson | imported from 3GU |
R2‑1916643 | Text proposal of power control for NR-DC | vivo | imported from 3GU |
R2‑1916644 | Report of [108#45][LTE NR Mob] UE feature list for LTE and NR mobility (Intel) | Intel Corporation | imported from 3GU |
R2‑1916645 | LS on clarification of CLI resource configuration | RAN2 | imported from 3GU |
page generated from database: 2024-04-13 13:51:47