3GPP TDocs (written contributions) at meeting
Meeting: R4-92 - 2019-08-26 to 2019-08-30, Ljubljana
meeting id: R4-92 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1907900 | Agenda for RAN4 #92 | RAN4 Chairman | imported from 3GU |
R4‑1907901 | RAN4 #91 Meeting Report | ETSI MCC | imported from 3GU |
R4‑1907902 | LS on channel quality report in connected mode for NB-IoT | RAN1, Huawei | imported from 3GU |
R4‑1907903 | LS to RAN on Coexistence of NB-IoT with NR | RAN1, Huawei | imported from 3GU |
R4‑1907904 | LS on LTE-MTC coexistence with NR | RAN1, Ericsson | imported from 3GU |
R4‑1907905 | LS on Reference Point for Timing Related Measurements | RAN1, CATT | imported from 3GU |
R4‑1907906 | Response LS on UL sharing applicability in different scenarios | RAN1, Nokia | imported from 3GU |
R4‑1907907 | LS on UE power saving | RAN1, CATT | imported from 3GU |
R4‑1907908 | LS Reply on reporting Tx DC location for supplementary uplink carrier | RAN1, Spreadtrum Communications | imported from 3GU |
R4‑1907909 | LS on RAN1 NR UE features | RAN1, NTT DOCOMO | imported from 3GU |
R4‑1907910 | LS on DL channel quality report for configured carrier in RRC connected mode | RAN2, ZTE | imported from 3GU |
R4‑1907911 | LS on supported BW for initial BWP | RAN2, Nokia | imported from 3GU |
R4‑1907912 | LS on measurement gap for SRS-RSRP or CLI-RSSI measurements | RAN2, LGE | imported from 3GU |
R4‑1907913 | Response LS on SL RLM / RLF in NR V2X for unicast | RAN2, LGE | imported from 3GU |
R4‑1907914 | LS on measurements for SRVCC from 5G to 3G | RAN2, Ericsson | imported from 3GU |
R4‑1907915 | LS on RAN1/4 feature lists | RAN2, Intel | imported from 3GU |
R4‑1907916 | LS on NR fast Scell activation | RAN2, Qualcomm | imported from 3GU |
R4‑1907917 | 5G-NR FR2 Transmitter & Receiver Testability Issues – Regional Regulatory Bodies Input Required | RAN5, Qualcomm | imported from 3GU |
R4‑1907918 | LS to RAN4 to update 38.101-4 with Link Adaptation requirements | RAN5, Qualcomm | imported from 3GU |
R4‑1907919 | LS on multi-band test cases for FR2 Ues | RAN5, Apple | imported from 3GU |
R4‑1907920 | 5G-NR FR2 Transmitter & Receiver Testability Issues | RAN, Qualcomm | imported from 3GU |
R4‑1907921 | LS on inter-operator TDD operation | ITU-T SG 15 | imported from 3GU |
R4‑1907922 | LS on new work item to study planning aspects of speech quality in wireless communication systems | ITU-T SG 12 | imported from 3GU |
R4‑1907923 | TEST METHODS FOR OVER-THE-AIR TOTAL RADIATED POWER FIELD MEASUREMENTS FOR IMT RADIO EQUIPMENT UTILIZING ACTIVE ANTENNAS | ITU-R WP5D | imported from 3GU |
R4‑1907924 | Aero UEs in band 3 and protection of meteorological satellite below 1710 MHz | ECC PT1 | imported from 3GU |
R4‑1907925 | Frequency bands under consideration within CEPT for Railway Mobile Radio (RMR) | ECC Working Group FM | imported from 3GU |
R4‑1907926 | Direction of Travel (DoT) for FR1 | Spirent Communications | imported from 3GU |
R4‑1907927 | Work plan for NR performance requirement enhancement WI | China Telecom | imported from 3GU |
R4‑1907928 | On NR CA PDSCH normal demodulation requirements | China Telecom | imported from 3GU |
R4‑1907929 | General views on PMI reporting requirements for larger number of Tx ports | China Telecom | imported from 3GU |
R4‑1907930 | On PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1907931 | On CA CQI and FR1 PUSCH 256QAM requirements in Rel-16 | China Telecom | imported from 3GU |
R4‑1907932 | Summary of ideal and impairment results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1907933 | Simulaton results for FR2 PUSCH | China Telecom | imported from 3GU |
R4‑1907934 | Duplex mode for PUSCH performance requirements | China Telecom | imported from 3GU |
R4‑1907935 | Draft CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1907936 | Draft CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1907937 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1907938 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1907939 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1907940 | Draft CR to TS 38.104: Correction on the terminology in FRC tables in A.1 and A.2 | China Telecom | imported from 3GU |
R4‑1907941 | Draft CR to TS 38.141-1: Correction on the terminology in FRC tables in A.1 and A.2 | China Telecom | imported from 3GU |
R4‑1907942 | Draft CR to TS 38.141-2: Correction on the terminology in FRC tables in A.1 and A.2 | China Telecom | imported from 3GU |
R4‑1907943 | Further discussion on handover delay for LTE_feMob | China Telecom | imported from 3GU |
R4‑1907944 | n259 PC3 single-band requirement proposal | MediaTek Beijing Inc. | imported from 3GU |
R4‑1907945 | n259 associated multi-band relaxation proposal | MediaTek Beijing Inc. | imported from 3GU |
R4‑1907946 | Draft CR to FR1 ASEM NS_27 | Anritsu Corporation | imported from 3GU |
R4‑1907947 | ^^On alignment of FR2 general spurious requirement with CEPT spec | Anritsu Corporation | imported from 3GU |
R4‑1907948 | Effect of range length to PSP | Spirent Communications | imported from 3GU |
R4‑1907949 | On the probe layout on FR2 MPAC systems | Spirent Communications | imported from 3GU |
R4‑1907950 | MSD for reference sensitivity in Band 74/n74 | Qualcomm Incorporated | imported from 3GU |
R4‑1907951 | Correction to reference sensitivity for Band 74 | Qualcomm Incorporated | imported from 3GU |
R4‑1907952 | Correction to reference sensitivity for Band 74 | Qualcomm Incorporated | imported from 3GU |
R4‑1907953 | Correction to reference sensitivity for Band n74 | Qualcomm Incorporated | imported from 3GU |
R4‑1907954 | MSD for reference sensitivity in bands n5 and n8 | Qualcomm Incorporated | imported from 3GU |
R4‑1907955 | Correction to reference sensitivity for Band n5 and n8 | Qualcomm Incorporated | imported from 3GU |
R4‑1907956 | Reference sensitivity for intra-band EN-DC with single uplink | Qualcomm Incorporated | imported from 3GU |
R4‑1907957 | Reference sensitivity for intra-band EN-DC with single uplink | Qualcomm Incorporated | imported from 3GU |
R4‑1907958 | Improving A-MPR for intra-band EN-DC in Release 16 | Qualcomm Incorporated | imported from 3GU |
R4‑1907959 | EN-DC power sharing testability | Qualcomm Incorporated | imported from 3GU |
R4‑1907960 | PCMAX for EN-DC with intra-band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1907961 | NR-U PA calibration | Qualcomm Incorporated | imported from 3GU |
R4‑1907962 | NR-U single carrier interlaced waveform and emissions | Qualcomm Incorporated | imported from 3GU |
R4‑1907963 | Way forward on NR-U 6 GHz band plan | Qualcomm Incorporated | imported from 3GU |
R4‑1907964 | UAS in mobile bands | Qualcomm Incorporated | imported from 3GU |
R4‑1907965 | [Draft] Reply LS on Aero UEs in band 3 and protection of meteorological satellite below 1710 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑1907966 | Correction to FR1 ASEM NS_27 | Anritsu Corporation | imported from 3GU |
R4‑1907967 | TX EVM test condition correction for ULMIMO | Qualcomm Incorporated | imported from 3GU |
R4‑1907968 | LTE-M PUR RSRP TA Validation Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R4‑1907969 | NB-IOT PUR RSRP TA Validation Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R4‑1907970 | Update SNR range calculations and spreadsheets for RRM and Demodulation | ANRITSU LTD | imported from 3GU |
R4‑1907971 | Update of Noc values for Power class 2 demodulation test | ANRITSU LTD | imported from 3GU |
R4‑1907972 | Antenna configuration for LTE cell in EN-DC | ANRITSU LTD | imported from 3GU |
R4‑1907973 | Setup for Test cases with NR cells in both FR1 and FR2 | ANRITSU LTD | imported from 3GU |
R4‑1907974 | Specifying the effect of antenna gain range in 38.133 | ANRITSU LTD | imported from 3GU |
R4‑1907975 | Update Absolute SS-RSRP accuracy to include antenna gain | ANRITSU LTD | imported from 3GU |
R4‑1907976 | Update of Measurement side conditions for FR2 Power classes 2 and 3 | ANRITSU LTD | imported from 3GU |
R4‑1907977 | Correct units from MHz to PRBs for RLM transmission parameters | ANRITSU LTD | imported from 3GU |
R4‑1907978 | Update of Noc values for Power class 2 demodulation test | ANRITSU LTD | imported from 3GU |
R4‑1907979 | Antenna configuration for LTE cell in EN-DC | ANRITSU LTD | imported from 3GU |
R4‑1907980 | Setup for Test cases with NR cells in both FR1 and FR2 | ANRITSU LTD | imported from 3GU |
R4‑1907981 | Update Absolute SS-RSRP accuracy to include antenna gain | ANRITSU LTD | imported from 3GU |
R4‑1907982 | Update of Measurement side conditions for FR2 Power classes 2 and 3 | ANRITSU LTD | imported from 3GU |
R4‑1907983 | FR2 Inter-band CA reference architecture | Qualcomm Incorporated | imported from 3GU |
R4‑1907984 | Work plan and general issues with inter-band CA for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1907985 | Update to FR1 EVM definition | Rohde & Schwarz | imported from 3GU |
R4‑1907986 | Update to FR2 EVM definition | Rohde & Schwarz | imported from 3GU |
R4‑1907987 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1907988 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1907989 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1907990 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1907991 | NR FR1 MIMO OTA environment condition | MediaTek Beijing Inc. | imported from 3GU |
R4‑1907992 | 2D Compact Range for BS Testing – Calibration and Measurement Procedure | ROHDE & SCHWARZ | imported from 3GU |
R4‑1907993 | 2D Compact Range for BS Testing – MU budget analysis | ROHDE & SCHWARZ | imported from 3GU |
R4‑1907994 | Improving connection reliability with increased communications about RF exposure situation | Qualcomm Incorporated | imported from 3GU |
R4‑1907995 | Band n48 CA bandwidth class and CA configuration | Verizon UK Ltd | imported from 3GU |
R4‑1907996 | Requirement of n48 uplink intra-band CA | Verizon UK Ltd | imported from 3GU |
R4‑1907997 | Draft CR for n48 uplink CA | Verizon UK Ltd | imported from 3GU |
R4‑1907998 | Correction of CA configuration | Verizon UK Ltd | imported from 3GU |
R4‑1907999 | Draft CR for NR non-contiguous CA configuration | Verizon UK Ltd | imported from 3GU |
R4‑1908000 | Draft CR for NR non-contiguous CA configuration | Verizon UK Ltd | imported from 3GU |
R4‑1908001 | Draft CR for NR non-contiguous CA configuration | Verizon UK Ltd | imported from 3GU |
R4‑1908002 | Draft CR to EN-DC of 1 LTE band and 1 NR band | Verizon, Ericsson | imported from 3GU |
R4‑1908003 | On UE CBW determination for initial BWP | SoftBank Corp. | imported from 3GU |
R4‑1908004 | Summary of n41 30MHz configuration study | SoftBank Corp. | imported from 3GU |
R4‑1908005 | Addition of NS information on 30MHz support for n41 | SoftBank Corp. | imported from 3GU |
R4‑1908006 | On handling of regulatory requirements in 3GPP | SoftBank Corp. | imported from 3GU |
R4‑1908007 | TP to 38.820 on the regulatory overview of 7-24 GHz for ITU Regions 1 and 2 | Apple Inc. | imported from 3GU |
R4‑1908008 | TP to 38.820 on the feasibility of UE conducted requirements in the 7-24 GHz range | Apple Inc. | imported from 3GU |
R4‑1908009 | Motivation for the study on enhanced test methods for FR2 | Apple Inc., CAICT | imported from 3GU |
R4‑1908010 | New SID: Study on enhanced test methods for FR2 | Apple Inc., CAICT | imported from 3GU |
R4‑1908011 | Multi-band requirement framework for Band n259 | Apple Inc. | imported from 3GU |
R4‑1908012 | Views on the testability of DL 256QAM in FR2 | Apple Inc. | imported from 3GU |
R4‑1908013 | Non-simultaneous transmission for intra-band non-contiguous UL CA in FR2 | Apple Inc. | imported from 3GU |
R4‑1908014 | Non-simultaneous transmission for inter-band UL CA in FR2 | Apple Inc. | imported from 3GU |
R4‑1908015 | Views on beam correspondence enhancements in Rel-16 | Apple Inc. | imported from 3GU |
R4‑1908016 | SNR conditions for beam correspondence | Apple Inc. | imported from 3GU |
R4‑1908017 | dCR to 38.101-2 on SNR conditions for beam correspondence | Apple Inc. | imported from 3GU |
R4‑1908018 | Views on the work plan for the FR2 RRM work item | Apple Inc. | imported from 3GU |
R4‑1908019 | Further views on FR1 MIMO OTA testing conditions | Apple Inc. | imported from 3GU |
R4‑1908020 | Verification of emulated DL signal quality for FR2 MIMO OTA | Apple Inc. | imported from 3GU |
R4‑1908021 | Uplink duty cycle enhancements for the MPE scenario | Apple Inc. | imported from 3GU |
R4‑1908022 | Draft CR to 38.101-1 rel. 15 to fix Out-of-band Blocking issue for bands n51, n76 | Apple | imported from 3GU |
R4‑1908023 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 51, 76 | Apple | imported from 3GU |
R4‑1908024 | CR to 36.101 rel. 16 to fix Out-of-band Blocking issue for bands 51, 76 | Apple | imported from 3GU |
R4‑1908025 | Out-of-band Blocking for bands 51, n51, 76, n76 | Apple | imported from 3GU |
R4‑1908026 | Draft CR to 38.101-1 rel. 15 to fix missing Out-of-band Blocking exceptions for NE-DC | Apple | imported from 3GU |
R4‑1908027 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | Apple | imported from 3GU |
R4‑1908028 | CR for Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | Apple | imported from 3GU |
R4‑1908029 | Band 41 29dBm HPUE - Antenna Coupling Issue | Apple | imported from 3GU |
R4‑1908030 | Further considerations on the RACH-less handover for NR | Apple Inc. | imported from 3GU |
R4‑1908031 | New WI proposal: addition of wider channel bandwidth in NR band n28 | CBN, Huawei, HiSilicon | imported from 3GU |
R4‑1908032 | draft CR on FR2 PC2 operating band group | LG Electronics | imported from 3GU |
R4‑1908033 | UE transmit timing Error for NR V2X | LG Electronics | imported from 3GU |
R4‑1908034 | BWP switching delay for NR V2X | LG Electronics | imported from 3GU |
R4‑1908035 | Interruption due to BWP switching in NR V2X | LG Electronics | imported from 3GU |
R4‑1908036 | Simulation assumption of NR SLSS synchronization | LG Electronics | imported from 3GU |
R4‑1908037 | WF on NR V2X RRM requirement scope | LG Electronics | imported from 3GU |
R4‑1908038 | Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1908039 | Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1908040 | Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1908041 | Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1908042 | Draft CR to 38.141-2: Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1908043 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1908044 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1908045 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1908046 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1908047 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1908048 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1908049 | Introduction of requirements for NR + UTRA/GSM combinations | Ericsson | imported from 3GU |
R4‑1908050 | Introduction of requirements for NR + UTRA/GSM combinations | Ericsson | imported from 3GU |
R4‑1908051 | TP to TR 38.820: Description of BS architectures and types | Ericsson | imported from 3GU |
R4‑1908052 | TP to TR 38.820: Frequency range characteristics | Ericsson | imported from 3GU |
R4‑1908053 | Filtering for 10 GHz and 15 GHz example frequencies in 7-24 GHz | Ericsson | imported from 3GU |
R4‑1908054 | TP to TR 38.820: Filtering aspects for different example frequencies in subclause 5.4.5 | Ericsson | imported from 3GU |
R4‑1908055 | NR demodulation test methodology for the test metric of 99.999% reliability | Ericsson | imported from 3GU |
R4‑1908056 | Discussion on the PUSCH demodulation requirements for Rel-16 NR-HST scenarios | Ericsson | imported from 3GU |
R4‑1908057 | Simulation Assumptions for NR HST PUSCH Demodulation Requirements | Ericsson | imported from 3GU |
R4‑1908058 | Discussion on 30% of maximum throughput for NR PUSCH performance requirements | Ericsson | imported from 3GU |
R4‑1908059 | NR BS demod – Additional requirements | Ericsson | imported from 3GU |
R4‑1908060 | On NB-IoT requirement coverage | Ericsson | imported from 3GU |
R4‑1908061 | Feasibility of asynchronous operation of CA_n78-n79 MSD due to cross band isolation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1908062 | Draft CR to correct 7.3B.2.3.2 and 7.3B.2.3.4 for EN-DC DC_7_n78 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1908063 | CR to correct 7.3B.2.3.2 and 7.3B.2.3.4 for EN-DC DC_7_n77 and DC_7_n78 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1908064 | Usage of UBF for FR2 NR MIMO OTA testing | ROHDE & SCHWARZ | imported from 3GU |
R4‑1908065 | TP to TR 38.827 v1.0.1 on DUT positioning guidelines | ROHDE & SCHWARZ | imported from 3GU |
R4‑1908066 | Correction to A.4.4.3.1 EN-DC FR1 timing advance adjustment accuracy | ANRITSU LTD | imported from 3GU |
R4‑1908067 | CR for TS37.105: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1908068 | CR for TS37.145-1: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1908069 | CR for TS37.145-2: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1908070 | CR for TS37.105: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1908071 | CR for TS37.145-1: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1908072 | CR for TS37.145-2: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1908073 | Spectrum utilization for NR-U | Samsung | imported from 3GU |
R4‑1908074 | IAB technical report handling | Samsung | imported from 3GU |
R4‑1908075 | Co-existence simulation result for layout 1 | Samsung | imported from 3GU |
R4‑1908076 | Co-existence simulation result for layout 2 | Samsung | imported from 3GU |
R4‑1908077 | Discussion IAB scenario | Samsung | imported from 3GU |
R4‑1908078 | Discussion on specification skeleton for IAB RF | Samsung | imported from 3GU |
R4‑1908079 | Discussion on side condition of beam correspondence | Samsung | imported from 3GU |
R4‑1908080 | Discussion on spherical coverage percentile for PC3 UE | Samsung | imported from 3GU |
R4‑1908081 | draft CR to TS 38.101-2 on side condition of beam correspondence | Samsung | imported from 3GU |
R4‑1908082 | draft CR to TS 38.101-2 on channel spacing for CA | Samsung | imported from 3GU |
R4‑1908083 | draft CR to TR 38.810 on side condition of beam correspondence | Samsung | imported from 3GU |
R4‑1908084 | draft CR to TR 38.817-01 on FR1 inner RB allocation range | Samsung | imported from 3GU |
R4‑1908085 | Discussion on Noc setup and side conditions for FR2 testing | Samsung | imported from 3GU |
R4‑1908086 | Editorial correction to TS38.133 on RRC connection mobility control (Section 6.2) | Samsung | imported from 3GU |
R4‑1908087 | Editorial correction to TS38.133 on Test Cases for RRC_IDLE, RRC_INACTIVE and RRC_CONNECTED state mobility (Section A.4.3, A.5.3, A.6.1, A.6.2, A.6.3, A.7.1, A.7.2, A.7.3, A.8.2 and A.8.3) | Samsung | imported from 3GU |
R4‑1908088 | Draft CR to TS38.133 on FR2 test setup for random access test (Section A.5.3.2.2, A.7.3.2.2) | Samsung | imported from 3GU |
R4‑1908089 | Draft CR to TS38.133 on test cases for SSB RSRQ measuremet accuracy for FR1 (Section A.4.7.2.2, A.6.7.2.2) | Samsung | imported from 3GU |
R4‑1908090 | Draft CR to TS38.133 on test cases for SSB RSRQ measuremet accuracy for FR2 (Section A.5.7.2.2, A.7.7.2.2) | Samsung | imported from 3GU |
R4‑1908091 | Further Discussion on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1908092 | Reply LS on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1908093 | Darft CR to TS38.133 on measurement gap sharing for NE-DC and NR-DC (Section 9.1) | Samsung | imported from 3GU |
R4‑1908094 | TP for TR 38.716-02-00: CA_n2_n48 | Samsung,Verizon | imported from 3GU |
R4‑1908095 | TP for TR 38.716-02-00: CA_n48_n66 | Samsung,Verizon | imported from 3GU |
R4‑1908096 | TP to TR 38.716-02-00 CA_n5-n260 with 1UL and 2UL | Samsung,Verizon | imported from 3GU |
R4‑1908097 | TP to TR 38.716-02-00 CA_n5-n261 with 1UL and 2UL | Samsung,Verizon | imported from 3GU |
R4‑1908098 | TP for TR 37.716-11-11: DC_7_n66 and DC_7-7_n66 | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1908099 | TP for TR 37.716-11-11: DC_66A_n66A | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1908100 | TP for TR 37.716-21-11: DC_2-7_n66 and DC_2-7-7_n66 | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1908101 | TP for TR 37.716-21-11: DC_2-66_n66 | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1908102 | TP for TR 37.716-21-11: DC_7-66_n66 and DC_7-7-66_n66 | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1908103 | TP for TR 37.716-31-11: DC_2-7-66_n66 and DC_2-7-7-66_n66 | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1908104 | Discussion on IAB RF requirements | Samsung | imported from 3GU |
R4‑1908105 | Evaluation results for FR2 DL 256QAM | Samsung | imported from 3GU |
R4‑1908106 | Draft CR for correction FRC of PMI test cases | Samsung | imported from 3GU |
R4‑1908107 | Big CR for TS 38.101-4 | Samsung | imported from 3GU |
R4‑1908108 | Channel arrangement for NR-U | Samsung | imported from 3GU |
R4‑1908109 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1908110 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1908111 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1908112 | Draft CR on NR UCI on PUSCH performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1908113 | Draft CR on NR UCI on PUSCH conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1908114 | Draft CR on NR UCI on PUSCH radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1908115 | Updated simulation results for NR BS demodulation performance | Samsung | imported from 3GU |
R4‑1908116 | Updated simulation results for NR UCI on PUSCH | Samsung | imported from 3GU |
R4‑1908117 | Summary of ideal and impairment results for UCI on PUSCH | Samsung | imported from 3GU |
R4‑1908118 | Discussion and simulation results for NR PUCCH with multi-slot | Samsung | imported from 3GU |
R4‑1908119 | View on BS performance requirements for high speed scenario in NR Rel-16 | Samsung | imported from 3GU |
R4‑1908120 | Discussion and initial simulation results for NR HST PUSCH | Samsung | imported from 3GU |
R4‑1908121 | Discussion and initial simulation results for NR HST PRACH | Samsung | imported from 3GU |
R4‑1908122 | View on BS performance requirements for NR performance enhancement | Samsung Electronics Co., Ltd | imported from 3GU |
R4‑1908123 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1908124 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1908125 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1908126 | Correction to RMC for Cat M1 CSI tests | Rohde & Schwarz | imported from 3GU |
R4‑1908127 | NR UCI over PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908128 | On NR BS demodulation remaining general issues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908129 | On multi-slot PUCCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908130 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908131 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908132 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908133 | NR Rel-16 HST simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908134 | On NR Rel-16 HST BS demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908135 | On NR Rel-16 performance requirement enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908136 | On the test methodology for BS for test metric of 99.999% reliability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908137 | Update to FR2 EVM definition | ROHDE & SCHWARZ | imported from 3GU |
R4‑1908138 | Correction to EN-DC Spurious Emissions | ROHDE & SCHWARZ | imported from 3GU |
R4‑1908139 | Draft CR for TS 38.101-1 SUL configured power correction | InterDigital Communications | imported from 3GU |
R4‑1908140 | Draft CR for TS 38.101-3 NE-DC suffix – 3rd level indication subclause | InterDigital Communications | imported from 3GU |
R4‑1908141 | Draft CR on corrections for PDCCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1908142 | Draft CR on corrections and missing parameters for PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1908143 | Draft CR on corrections for CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1908144 | Views on feasibility of 256QAM for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908145 | Views on Testability for URLLC | Qualcomm Incorporated | imported from 3GU |
R4‑1908146 | Views on NR CA PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1908147 | Views on NR Application Layer Throughput Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908148 | LS Reply to RAN5 on updating 38.101-4 with Link Adaptation requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908149 | MPR in NR for SRS, PUCCH and PRACH | Qualcomm Incorporated | imported from 3GU |
R4‑1908150 | On FR2 NS_201 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1908151 | PA Back-off Requirements for FR2 ULCA Corner Case | Qualcomm Incorporated | imported from 3GU |
R4‑1908152 | PA Back-off Requirements for ULMIMO Corner Case | Qualcomm Incorporated | imported from 3GU |
R4‑1908153 | dCR to 38.101-2: Editorial corrections for 38.101-2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908154 | On applicability of single CC MPR for FR2 Intraband CA | Qualcomm Incorporated | imported from 3GU |
R4‑1908155 | On FR2 CA MPR table anomalies | Qualcomm Incorporated | imported from 3GU |
R4‑1908156 | Capturing ERC Rec. 74-01 in Emissions Requirements for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908157 | AMPR to comply with ERC 74-01, ver. May 2019 | Qualcomm Incorporated | imported from 3GU |
R4‑1908158 | dCR to 38.101-2: FR2 Beam Correspondence requirements completion | Qualcomm Incorporated | imported from 3GU |
R4‑1908159 | dCR to 38.101-2: Reference signal clarifications | Qualcomm Incorporated | imported from 3GU |
R4‑1908160 | dCR to 38.101-2: FR2 CA MPR refinement | Qualcomm Incorporated | imported from 3GU |
R4‑1908161 | dCR to 38.101-2: FR2 AMPR updates, including ERC 74-01 changes | Qualcomm Incorporated | imported from 3GU |
R4‑1908162 | dCR to 38.101-3: Editorial corrections for 38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1908163 | dCR to 38.101-1: Reference signal clarifications | Qualcomm Incorporated | imported from 3GU |
R4‑1908164 | UE Architecture for DL CA BW Enhancement for Rel. 16 FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908165 | Work Plan for DL CA BW Enhancement for Rel. 16 FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908166 | On FR2 Intra-band NC ULCA | Qualcomm Incorporated | imported from 3GU |
R4‑1908167 | On HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908168 | HST UE Demod Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1908169 | CR: Demod test definition for HST in 500km/h speed | Qualcomm Incorporated | imported from 3GU |
R4‑1908170 | On NR V2X RRM Core Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1908171 | Clarification on RSSI measurement for inter-frequency R13 | MediaTek inc. | imported from 3GU |
R4‑1908172 | Clarification on RSSI measurement for inter-frequency R14 | MediaTek inc. | imported from 3GU |
R4‑1908173 | Clarification on RSSI measurement for inter-frequency R15 | MediaTek inc. | imported from 3GU |
R4‑1908174 | Clarification on RSSI measurement for inter-frequency R16 | MediaTek inc. | imported from 3GU |
R4‑1908175 | Discussion on Replying LS on Supported BW for Initial BWP | MediaTek inc. | imported from 3GU |
R4‑1908176 | Reply LS on Supported BW for Initial BWP | MediaTek inc. | imported from 3GU |
R4‑1908177 | Measurement outside gap in FR2 for CCs with partially-overlapped SMTC occasions | MediaTek inc. | imported from 3GU |
R4‑1908178 | Further clarification on SSB-toMeasure in section 9.2.5.1 | MediaTek inc., Intel | imported from 3GU |
R4‑1908179 | Remaining issues for beam switching on timing requirements for FR2 | MediaTek inc. | imported from 3GU |
R4‑1908180 | Clarification on MRTD and MTTD for FR1-FR2 inter-band CA | MediaTek inc. | imported from 3GU |
R4‑1908181 | On remaining issues in BWP switch requirements | MediaTek inc. | imported from 3GU |
R4‑1908182 | Clarification CR on BWP switch delay requirements (8.6) | MediaTek inc. | imported from 3GU |
R4‑1908183 | Clarification CR on BWP switch interruption requirements (8.2) | MediaTek inc. | imported from 3GU |
R4‑1908184 | Consideration on sync raster design for NR-U | MediaTek inc. | imported from 3GU |
R4‑1908185 | RSSI measurement definition | MediaTek inc. | imported from 3GU |
R4‑1908186 | LS on RSSI measurement definition | MediaTek inc. | imported from 3GU |
R4‑1908187 | Discussion on the need for URLLC-specific RLM requirement | MediaTek inc. | imported from 3GU |
R4‑1908188 | SS-SINR measurement requirements in HST | MediaTek inc. | imported from 3GU |
R4‑1908189 | Discussion on simulation assumptions for NR-HST UE | MediaTek inc. | imported from 3GU |
R4‑1908190 | Discussion on TCI State Switching Requirements | Intel Corporation | imported from 3GU |
R4‑1908191 | Draft CR to 38.133 on TCI State Switching Requirements (Section 8.10) | Intel Corporation | imported from 3GU |
R4‑1908192 | Draft CR to 38.133 : Testcases for Beam failure detection and Link recovery procedures in FR1 for EN-DC (Section A.4.5.5) | Intel Corporation | imported from 3GU |
R4‑1908193 | Discussion on RLM requirements for URLLC | Intel Corporation | imported from 3GU |
R4‑1908194 | DraftCR to 38.101-4: Corrections to PDCCH test case parameters | Intel Corporation | imported from 3GU |
R4‑1908195 | DraftCR to 38.101-4 : Corrections to Interworking requirements | Intel Corporation | imported from 3GU |
R4‑1908196 | Draft CR to 38.101-4: Corrections to PMI reporting test case parameters in FR1 | Intel Corporation | imported from 3GU |
R4‑1908197 | Draft CR to 38.101-4: Corrections to CSI reporting test case parameters in FR2 | Intel Corporation | imported from 3GU |
R4‑1908198 | Discussion on test feasability of URLLC requirements | Intel Corporation | imported from 3GU |
R4‑1908199 | Discussion on introducing requirements with more than 8Tx ports | Intel Corporation | imported from 3GU |
R4‑1908200 | Draft CR to TS 38.101-4: Applicability of minimum requirements | Intel Corporation | imported from 3GU |
R4‑1908201 | Draft CR to TS 38.101-4: Enhanced SU-MIMO receiver definition | Intel Corporation | imported from 3GU |
R4‑1908202 | Draft CR to TS 38.101-4: Environmental conditions | Intel Corporation | imported from 3GU |
R4‑1908203 | Views on the demodulation requirements for NR HST-SFN scenario | Intel Corporation | imported from 3GU |
R4‑1908204 | Views on the demodulation requirements for NR HST single tap scenario | Intel Corporation | imported from 3GU |
R4‑1908205 | Simulation results for LTE HST bidirectional SFN scenario | Intel Corporation | imported from 3GU |
R4‑1908206 | Views on LTE HST CA requirements | Intel Corporation | imported from 3GU |
R4‑1908207 | Draft CR to 38.101-1: Correction of table in Nominal Channel spacing for CA requirement | Intel Corporation | imported from 3GU |
R4‑1908208 | Draft CR to 38.101-2: Correction of table in Nominal Channel spacing for CA requirement | Intel Corporation | imported from 3GU |
R4‑1908209 | Draft CR to TS 38.101-1: Corrections for DL RMC for FR1 tests | Intel Corporation | imported from 3GU |
R4‑1908210 | Draft CR to TS 38.101-2: Corrections for UL and DL RMC for FR2 tests | Intel Corporation | imported from 3GU |
R4‑1908211 | Discussion on feasibility of DL 256QAM in FR2 scenarios | Intel Corporation | imported from 3GU |
R4‑1908212 | Summary of NR PDSCH demodulation simulation results (FR1 FDD) | Intel Corporation | imported from 3GU |
R4‑1908213 | Summary of NR PDSCH demodulation simulation results (FR1 TDD) | Intel Corporation | imported from 3GU |
R4‑1908214 | Draft CR to TS 38.101-4: NR FR1 PDSCH requirements finalization | Intel Corporation | imported from 3GU |
R4‑1908215 | Draft CR to TS 38.101-4: Clarification of PTRS configuration for FR2 tests | Intel Corporation | imported from 3GU |
R4‑1908216 | Draft CR to TS 38.101-4: Corrections for SDR requirements | Intel Corporation | imported from 3GU |
R4‑1908217 | Draft CR to TS 38.101-4: DL power configuration in radiated tests | Intel Corporation | imported from 3GU |
R4‑1908218 | Discussion on NR CA UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1908219 | Discussion on UE demodulation requirements for TDD LTE-NR coexistence scenarios | Intel Corporation | imported from 3GU |
R4‑1908220 | Simulation results of RSS for Rel-16 additional MTC enhancements for LTE | Intel Corporation | imported from 3GU |
R4‑1908221 | Discussion about RSRP measurement test method in FR2 | Intel Corporation | imported from 3GU |
R4‑1908222 | Email discussion summary for open issues (“TBD”) in TC configurations | Intel Corporation | imported from 3GU |
R4‑1908223 | On measurements for SRVCC from 5G to 3G | Intel Corporation | imported from 3GU |
R4‑1908224 | Reply LS on measurements for SRVCC from 5G to 3G | Intel Corporation | imported from 3GU |
R4‑1908225 | CR for MG applicability requirement for SRVCC | Intel Corporation | imported from 3GU |
R4‑1908226 | On RAN4 work scope for NR positioning | Intel Corporation | imported from 3GU |
R4‑1908227 | On RAN4 time plan for NR positioning | Intel Corporation | imported from 3GU |
R4‑1908228 | On Reference Point for Timing Related Measurements | Intel Corporation | imported from 3GU |
R4‑1908229 | Reply LS on Reference Point for Timing Related Measurements | Intel Corporation | imported from 3GU |
R4‑1908230 | Time plan of R16 RRM enhancement WI | Intel Corporation | imported from 3GU |
R4‑1908231 | Wayforward on open issues for TS38.133 test case design | Intel Corporation | imported from 3GU |
R4‑1908232 | Work plan for R16 NR HST | Intel Corporation | imported from 3GU |
R4‑1908233 | RRM requirement for conditional handover | Intel Corporation | imported from 3GU |
R4‑1908234 | Wayforward on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1908235 | draftCR on test cases for handover in FR1 (section A.6.3.1) | Intel Corporation | imported from 3GU |
R4‑1908236 | draftCR on test cases for handover in FR2 (section A.7.3.1) | Intel Corporation | imported from 3GU |
R4‑1908237 | draftCR on test cases for SA FR2 inter-frequency measurement (section A.5.4.3) | Intel Corporation | imported from 3GU |
R4‑1908238 | draftCR on test cases for SA FR2 inter-frequency measurement (section A.7.4.3) | Intel Corporation | imported from 3GU |
R4‑1908239 | RRM requirement for enhanced handover in LTE | Intel Corporation | imported from 3GU |
R4‑1908240 | Editorial CR on handover core requirement (section 6.1) | Intel Corporation | imported from 3GU |
R4‑1908241 | Discussion on cell reselection requirements of NR-U | Intel Corporation | imported from 3GU |
R4‑1908242 | Discussion on HO requirements of NR-U | Intel Corporation | imported from 3GU |
R4‑1908243 | Discussion on NR-U measurement requirements | Intel Corporation | imported from 3GU |
R4‑1908244 | Discussion on NR fast SCell activation of MR-DC enhancement | Intel Corporation | imported from 3GU |
R4‑1908245 | [draft]Reply LS on NR fast SCell activation | Intel Corporation | imported from 3GU |
R4‑1908246 | Side conditions on beam correspondence test | Intel Corporation | imported from 3GU |
R4‑1908247 | On FR2 CA in Rel-16 | Intel Corporation | imported from 3GU |
R4‑1908248 | Draft CR to 38.101-1 NS_40, NS_41, NS_42 spurious emission requirement | Intel Corporation | imported from 3GU |
R4‑1908249 | Draft CR to 38.101-1 A-MPR for NS_05 and NS_05U | Intel Corporation | imported from 3GU |
R4‑1908250 | Draft CR to TS38.101-1 Almost contiguous MPR | Intel Corporation | imported from 3GU |
R4‑1908251 | NR-U power class and ACLR requirement | Intel Corporation | imported from 3GU |
R4‑1908252 | A-MPR/MPR improvement for B41/n41 EN-DC | Intel Corporation | imported from 3GU |
R4‑1908253 | Views on FR2 CA MPR enhancement | Intel Corporation | imported from 3GU |
R4‑1908254 | CR to 36.101 NS_40, NS_41, NS_42 spurious emission requirement | Intel Corporation | imported from 3GU |
R4‑1908255 | CR to 36.101 NS_40, NS_41, NS_42 spurious emission requirement | Intel Corporation | imported from 3GU |
R4‑1908256 | TP for TR 38.716-03-01: CA_n28-n78-n257 | KDDI | imported from 3GU |
R4‑1908257 | TP for TR 38.716-03-01: CA_n3-n77-n257 | KDDI | imported from 3GU |
R4‑1908258 | TP for TR 38.716-03-01: CA_n3-n78-n257 | KDDI | imported from 3GU |
R4‑1908259 | TP for TR 38.716-03-01: CA_n28-n77-n257 | KDDI | imported from 3GU |
R4‑1908260 | TP for TR 38.716-02-00: CA_n3-n77 | KDDI | imported from 3GU |
R4‑1908261 | TP for TR 38.716-02-00: CA_n28A-n77(2A) | KDDI | imported from 3GU |
R4‑1908262 | TP for TR 38.716-02-00: CA_n77-n257 | KDDI | imported from 3GU |
R4‑1908263 | TP for TR 38.716-02-00: CA_n77A-n261A | KDDI | imported from 3GU |
R4‑1908264 | TP for TR 38.716-02-00: CA_n28A-n78A | KDDI | imported from 3GU |
R4‑1908265 | TP for TR 38.716-02-00: CA_n3-n257 | KDDI | imported from 3GU |
R4‑1908266 | TP for TR 38.716-02-00: CA_n28-n257 | KDDI | imported from 3GU |
R4‑1908267 | draft CR for introduce NR CA of 2 bands DL and 2 bands UL for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1908268 | TP for TR 38.716-03-02: CA_n3A-n77A-n257 | KDDI | imported from 3GU |
R4‑1908269 | TP for TR 38.716-03-02: CA_n3A-n77(2A)-n257 | KDDI | imported from 3GU |
R4‑1908270 | TP for TR 38.716-03-02: CA_n3A-n78A-n257 | KDDI | imported from 3GU |
R4‑1908271 | TP for TR 38.716-03-02: CA_n28A-n77A-n257 | KDDI | imported from 3GU |
R4‑1908272 | TP for TR 38.716-03-02: CA_n28A-n77(2A)-n257 | KDDI | imported from 3GU |
R4‑1908273 | TP for TR 38.716-03-02: CA_n28A-n78A-n257 | KDDI | imported from 3GU |
R4‑1908274 | TP for TR 37.716-11-11: DC_1A_n77(2A) | KDDI | imported from 3GU |
R4‑1908275 | TP for TR 37.716-11-11: DC_3A_n77(2A) | KDDI | imported from 3GU |
R4‑1908276 | TP for TR 37.716-11-11: DC_41_n77(2A) | KDDI | imported from 3GU |
R4‑1908277 | TP for TR 37.716-21-11: DC_1A-3A_n77(2A) | KDDI | imported from 3GU |
R4‑1908278 | TP for TR 37.716-21-21: DC_1A-3A_n77-n257 | KDDI | imported from 3GU |
R4‑1908279 | draft CR for introduce DC of LTE 1band + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1908280 | draft CR for introduce DC of LTE 1band + NR 2band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1908281 | draft CR for introduce DC of LTE 2band + NR 2band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1908282 | Discussion on maximum Doppler shift in uplink for Rel-16 high speed train scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908283 | REL-16 TS 38.307 addition of Annexes for UE RF requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908284 | Addition of new channel bandwidths for n7 into TS 38.101-1 | Nokia | imported from 3GU |
R4‑1908285 | work plan for REL16 UE RF WI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908286 | TR skeleton for REL-16 UE RF WI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908287 | FR1 PC2 almost contiguous allocations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908288 | TP to TR 37.716-11-11: DC_2A_n261J and DC_2A_n261K | Nokia | imported from 3GU |
R4‑1908289 | TP to TR 37.716-21-21: DC_2_n41-n261 | Nokia | imported from 3GU |
R4‑1908290 | TP to TR 37.716-21-11: DC_2-46_n261 | Nokia | imported from 3GU |
R4‑1908291 | TP to TR 37.716-21-21: DC_66_n41-n261 | Nokia | imported from 3GU |
R4‑1908292 | Correction on EN-DC grouping in Rel-16 spec | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908293 | A-MPR for CA_48B | Nokia | imported from 3GU |
R4‑1908294 | PC2 for bands 31 and 72 Release independence aspects | Nokia | imported from 3GU |
R4‑1908295 | PC2 for bands 31 and 72 Emission study | Nokia | imported from 3GU |
R4‑1908296 | Introduction of PC2 for Category HD-FDD M1 and M2 UE operating on bands 31 and 72 | Nokia | imported from 3GU |
R4‑1908297 | Introduction PC2 for HD-FDD UE category M1 and M2 for TS 36.307 | Nokia | imported from 3GU |
R4‑1908298 | TP for TR37.716-21-11: UE MSD requirements for DC_3-7_n77 | MediaTek Inc., CHTTL | imported from 3GU |
R4‑1908299 | CR to TS 36.141: Removal of square brackets in receiver narrowband intermodulation performance requirement for Wide Area BS for NB-IoT standalone | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908300 | CR to TS 36.141: Removal of square brackets in receiver narrowband intermodulation performance requirement for Wide Area BS for NB-IoT standalone | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908301 | CR to TS 36.141: Removal of square brackets in receiver narrowband intermodulation performance requirement for all BS classes for NB-IoT standalone | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908302 | CR to TS 36.141: Removal of square brackets in receiver narrowband intermodulation performance requirement for all BS classes for NB-IoT standalone | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908303 | CR to TS 37.105: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908304 | CR to TS 37.105: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908305 | CR to TS 37.145-2: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908306 | CR to TS 37.145-2: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908307 | Draft CR to TS 38.104: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908308 | Draft CR to TS 38.141-2: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908309 | CR to TS 37.145-2: Removal of BS type 2-O in radiated performance requirements for NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908310 | CR to TS 37.145-2: Removal of BS type 2-O in radiated performance requirements for NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908311 | Draft CR to TS 38.141-1: Clarifications on receive configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908312 | Draft CR to TS 38.141-2: Clarification on OTA receiver requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908313 | Draft CR to TS 38.141-2: Corrections on notes for radiated sensitivity testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908314 | TP to TR 37.824: Corrections on channel raster and PRB and subcarrier grid alignment | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908315 | TP to TR 37.824: Update of system level simulation results for coexistence study between R15 NR and R13/R14/R15 NB-IoT standalone operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908316 | Proposals on definitions of in-band, guard band and stand-alone operations when NB-IoT is located within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908317 | Proposals on power boosting requirement when NB-IoT is located within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908318 | Specification of URLLC RAN4 RF core requirements based on Rel-16 URLLC functionalities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908319 | CR to TS 38.817-01: Correction on coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 with 20MHz channel bandwidth | Nokia, Sprint | imported from 3GU |
R4‑1908320 | TP to TR 38.820: Update of BS noise figure over the 7-24 GHz range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908321 | Proposals on BS out-of-band blocking requirements over the 7-24 GHz range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908322 | Simplification of the band combination related spec and procedure | NTT DOCOMO INC. | imported from 3GU |
R4‑1908323 | Correction to NB-IoT RSTD delay test case (Rel 14) | Rohde & Schwarz | imported from 3GU |
R4‑1908324 | Correction to NB-IoT RSTD delay test case (Rel 15) | Rohde & Schwarz | imported from 3GU |
R4‑1908325 | Correction to NB-IoT RSTD delay test case (Rel 16) | Rohde & Schwarz | imported from 3GU |
R4‑1908326 | Draft CR to TS 38.133: Editorial corrections (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1908327 | Draft CR to TS 38.133: Editorial corrections (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1908328 | Draft CR to TS 38.133: Corection in Sections A.4.7.1.1 and A.6.7.1.1 (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1908329 | Draft CR to TS 38.133: Corection in Sections A.4.7.1.1 and A.6.7.1.1 (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1908330 | CR to TS 37.113 Correction on CISPR 16-1-1 for DC conducted Emission(clause 7.1 and subclause 8.3.2 ) | ZTE Corporation | imported from 3GU |
R4‑1908331 | ]CR to TS 37.113 Correction on NR performance criteria(subclause 6.1.5 ) | ZTE Corporation | imported from 3GU |
R4‑1908332 | CR to TS 37.113 Correction on surge test level for outdoor telecommunication ports(subclause 9.7.2.1 ) | ZTE Corporation | imported from 3GU |
R4‑1908333 | CR to TS 37.114 Correction on CISPR 16-1-1 for DC conducted Emission(clause 2 and subclause 7.1 ) | ZTE Corporation | imported from 3GU |
R4‑1908334 | Draft CR to TS 38.113 Add the RI test set-up requirement for OTA NR BS(subclause 9.2.2) | ZTE Corporation | imported from 3GU |
R4‑1908335 | CR to TR 38.817-02 BS type correction subclause 11 | ZTE Corporation | imported from 3GU |
R4‑1908336 | CR to TS 37.113 subclause 4.5 | ZTE Corporation | imported from 3GU |
R4‑1908337 | Discussion on radiated immunity test set-up for OTA NR BS_r1 | ZTE Corporation | imported from 3GU |
R4‑1908338 | CR to TS 37.104 some clarification as blocking test range | ZTE Corporation | imported from 3GU |
R4‑1908339 | CR to TS 37.104 some clarification as blocking test range Cat.A | ZTE Corporation | imported from 3GU |
R4‑1908340 | CR to TS 37.104 TX&RX spurious emission range subclause 6.6.1.1&7.6.1 | ZTE Corporation | imported from 3GU |
R4‑1908341 | CR to TS 37.104 TX&RX spurious emission range subclause 6.6.1.1&7.6.1 Cat.A | ZTE Corporation | imported from 3GU |
R4‑1908342 | CR to TS 37.141 some clarification as blocking test range | ZTE Corporation | imported from 3GU |
R4‑1908343 | CR to TS 37.141 some clarification as blocking test range Cat.A | ZTE Corporation | imported from 3GU |
R4‑1908344 | CR to TS 37.141 TX&RX spurious emission range subclause 6.6.1.5.1&7.6.5.1 | ZTE Corporation | imported from 3GU |
R4‑1908345 | CR to TS 37.141 TX&RX spurious emission range subclause 6.6.1.5.1&7.6.5.1 Cat.A | ZTE Corporation | imported from 3GU |
R4‑1908346 | draftCR to TS 38.141-2 RX IMD subclause 7.8.4.2 | ZTE Corporation | imported from 3GU |
R4‑1908347 | draftCR to TS 38.141-2 some clean ups | ZTE Corporation | imported from 3GU |
R4‑1908348 | on 7-24GHz co-location | ZTE Corporation | imported from 3GU |
R4‑1908349 | on IAB EMC requirement and further plan | ZTE Corporation | imported from 3GU |
R4‑1908350 | TP to TR 7-24GHz OOB requirement | ZTE Corporation | imported from 3GU |
R4‑1908351 | TP on Adjacent Channel Coexistence | Futurewei | imported from 3GU |
R4‑1908352 | Evaluation Considerations for Indevice Coexistence | Futurewei | imported from 3GU |
R4‑1908353 | NR V2X UE Transmitter Characteristics | Futurewei | imported from 3GU |
R4‑1908354 | NR V2X UE RF Receiver Characteristics | Futurewei | imported from 3GU |
R4‑1908355 | CR on TS38.133 for CSSF outside gap when SFTD measurement is configured (Section 9.1.5.1) | MediaTek inc. | imported from 3GU |
R4‑1908356 | CR on TS38.133 for SFTD measurement requirements for NR SA (Section 9.3.8) | MediaTek inc. | imported from 3GU |
R4‑1908357 | CR on TS38.133 for gap pattern signaling (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1908358 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1908359 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1908360 | CR on TS38.133 for definition of detectable cell (Section 9.2.4.3, Section 9.3.6.3) | MediaTek inc. | imported from 3GU |
R4‑1908361 | CR on TS38 133 for EN-DC SS-SINR tests with PSCell in FR2 (Section A.5.7.3) | MediaTek inc. | imported from 3GU |
R4‑1908362 | CR on TS38.133 for SA SS-SINR tests with PCell in FR2 (Section A.7.7.3) | MediaTek inc. | imported from 3GU |
R4‑1908363 | CR on TS38.133 E-UTRAN – NR inter-RAT measurements test case with FR1 target cell and FR2 target cell (Section A.8.5.2) | MediaTek inc. | imported from 3GU |
R4‑1908364 | Discussion on UE dynamic adaptation to the maximum number of MIMO layers | MediaTek inc. | imported from 3GU |
R4‑1908365 | LS on switching and interruption time for UE dynamic adaptation to the maximum number of MIMO layers | MediaTek inc. | imported from 3GU |
R4‑1908366 | Discussion on IDLE mode CA measurement | MediaTek inc. | imported from 3GU |
R4‑1908367 | Reply LS on NR fast SCell activation | MediaTek inc. | imported from 3GU |
R4‑1908368 | Discussion on denser RS for SCell activation | MediaTek inc. | imported from 3GU |
R4‑1908369 | Discussion on requirement of conditional handover | MediaTek inc. | imported from 3GU |
R4‑1908370 | Draft TR37.824 v010 - Coexistence between NB-IoT and NR | Futurewei | imported from 3GU |
R4‑1908371 | Emission Mask Considerations for NR-U single wideband carrier operation modes | Charter Communications, Inc | imported from 3GU |
R4‑1908372 | Band Plan for 6 GHz | Charter Communications, Inc | imported from 3GU |
R4‑1908373 | TR 38.716-03-01 v 0.2.0 | CATT | imported from 3GU |
R4‑1908374 | Draft CR for TS38.101-1, Editorial corrections | CATT | imported from 3GU |
R4‑1908375 | Draft CR for TS38.101-2, Editorial corrections | CATT | imported from 3GU |
R4‑1908376 | Draft CR for TS38.101-3, Editorial corrections | CATT | imported from 3GU |
R4‑1908377 | Discussion on NR V2X UE RF requirements | CATT | imported from 3GU |
R4‑1908378 | TP for band and bandwidth for NR V2X | CATT | imported from 3GU |
R4‑1908379 | TP for Tx requirements for NR V2X | CATT | imported from 3GU |
R4‑1908380 | TP for Rx requirements for NR V2X | CATT | imported from 3GU |
R4‑1908381 | Revised work plan for power saving | CATT | imported from 3GU |
R4‑1908382 | Further discussion on MIMO layer adaptation | CATT | imported from 3GU |
R4‑1908383 | WF on switching and interruption for MIMO layer adaption | CATT | imported from 3GU |
R4‑1908384 | Discussion on reference point for timing related measurements in FR2 | CATT | imported from 3GU |
R4‑1908385 | Response LS on Reference Point for Timing Related Measurements in FR2 | CATT | imported from 3GU |
R4‑1908386 | Draft CR for addition requirement for EN-DC PC2 UE | CATT, CMCC | imported from 3GU |
R4‑1908387 | Draft CR for TS38.104: editorial correction for reference meausrement channel | CATT | imported from 3GU |
R4‑1908388 | Draft CR for TS38.141-1: editorial correction for reference meausrement channel | CATT | imported from 3GU |
R4‑1908389 | Discussion on EIRP measurement | CATT | imported from 3GU |
R4‑1908390 | Draft CR for TS38.141-2: Correction on test procedure for EIRP measurement | CATT | imported from 3GU |
R4‑1908391 | Discussion on 256QAM for FR2 | CATT | imported from 3GU |
R4‑1908392 | Discussion on PUSCH performance requirement with 30% throughput metric | CATT | imported from 3GU |
R4‑1908393 | Discussion on the simulation assumption for HST PUSCH | CATT | imported from 3GU |
R4‑1908394 | Discussion on the simulation assumption for HST PRACH | CATT | imported from 3GU |
R4‑1908395 | Simulation results for NR BS demodulation | CATT | imported from 3GU |
R4‑1908396 | Discussion on output RF spectrum emissions for NR V2X UE | CATT | imported from 3GU |
R4‑1908397 | Draft CR to TS38.104: Updates to NR PRACH performance requirements | CATT | imported from 3GU |
R4‑1908398 | Draft CR to TS38.141-1: Updates to NR PRACH performance requirements | CATT | imported from 3GU |
R4‑1908399 | LS on switching and interruption time for MIMO layer adaption | CATT | imported from 3GU |
R4‑1908400 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1908401 | CR on interruption due to one shot timing adjustment | CATT | imported from 3GU |
R4‑1908402 | CR on known conditions for TCI state | CATT | imported from 3GU |
R4‑1908403 | Work plan for RRM requirements for CSI-RS based L3 measurement | CATT | imported from 3GU |
R4‑1908404 | Further discussion on V2X UE sidelink transmit timing error | CATT | imported from 3GU |
R4‑1908405 | Initial discussion on RRM imapct for NR V2X | CATT | imported from 3GU |
R4‑1908406 | WF on V2X UE Sidelink transmit timing requirement | CATT | imported from 3GU |
R4‑1908407 | Updates to test cases for BWP switching in SA (section A.7.5.6.1) | CATT | imported from 3GU |
R4‑1908408 | Updates to test cases for interruptions at transitions in EN-DC (section A.5.5.2.1 and A.5.5.2.2) | CATT | imported from 3GU |
R4‑1908409 | Updates to test cases for interruption due to deactivated SCell operations in EN-DC (Section A.5.5.2.3-6) | CATT | imported from 3GU |
R4‑1908410 | Update to test cases for SCell activation/deactivation in SA (section A.6.5.3 and A.7.5.3) | CATT | imported from 3GU |
R4‑1908411 | Revised WID on Rel-16 NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1908412 | CR on introducing NR intra-band CA for 3DL Bands and 1UL band | CATT | imported from 3GU |
R4‑1908413 | summary of template for Band combination request | CATT | imported from 3GU |
R4‑1908414 | TP for 38.716-03-01: interference analysis for CA_n39A-n41A-n79A | CATT | imported from 3GU |
R4‑1908415 | TP for 38.716-03-01: UE requirements for CA_n8A-n39A-n41A | CATT | imported from 3GU |
R4‑1908416 | Removal of redundant requirements for 3 Bands CA | CATT | imported from 3GU |
R4‑1908417 | Discussion on BWP-bandwidth and open issue for UE initial access | CATT | imported from 3GU |
R4‑1908418 | Reply LS on supported BW for initial BWP | CATT | imported from 3GU |
R4‑1908419 | CR for Narrowband blocking for LTE CatM1/M2 | Qualcomm Inc | imported from 3GU |
R4‑1908420 | CR for Narrowband blocking for LTE CatM1/M2 | Qualcomm Inc | imported from 3GU |
R4‑1908421 | On NR FR1 MPAC Probe Layout | vivo | imported from 3GU |
R4‑1908422 | Discussion on NR V2X UE RF requirements | vivo | imported from 3GU |
R4‑1908423 | Discussion on system parameters for NR V2X band n47 | vivo | imported from 3GU |
R4‑1908424 | Discussion on system parameters for NR-U band n46 | vivo | imported from 3GU |
R4‑1908425 | Draft reply LS on sync raster placement for NR-U band in 5GHz | vivo | imported from 3GU |
R4‑1908426 | Inclusion of minimum and OFF power and occupied bandwidth for intra-band CA | vivo | imported from 3GU |
R4‑1908427 | Minor corrections of intra-band non-contiguous CA operating bands in TS 38.101-1 | vivo | imported from 3GU |
R4‑1908428 | Minor corrections of intra-band non-contiguous CA operating bands in TS 38.101-2 | vivo | imported from 3GU |
R4‑1908429 | Considerations on NR UE power saving RRM aspects | vivo | imported from 3GU |
R4‑1908430 | Further evaluation of switching and interruption time for UE antenna switching | vivo | imported from 3GU |
R4‑1908431 | [DRAFT]LS out on the switching and interruption time for UE dynamic adaptation to the maximum number of MIMO layers | vivo | imported from 3GU |
R4‑1908432 | Further correction of RefSens exceptions due to UL harmonic interference for NR CA and SUL in 38.101-1 | vivo | imported from 3GU |
R4‑1908433 | Adding DeltaFHD for CA_n1-n77 refersense requirments | vivo | imported from 3GU |
R4‑1908434 | Further correction of RefSens exceptions due to UL harmonic interference for EN-DC in 38.101-3 | vivo | imported from 3GU |
R4‑1908435 | Correction of L1 RSRP reporting range | vivo | imported from 3GU |
R4‑1908436 | CR for Narrowband blocking for LTE CatM1/M2 | Qualcomm Inc | imported from 3GU |
R4‑1908437 | CR for Narrowband blocking for LTE CatM1/M2 | Qualcomm Inc | imported from 3GU |
R4‑1908438 | Impact of support structure materials on radiation patterns of mmWave phased arrays. | ETS-Lindgren Europe | imported from 3GU |
R4‑1908439 | Discussion on switching and interruption time for MIMO layer adaptation for power savings | Qualcomm Inc | imported from 3GU |
R4‑1908440 | CR to T 38.104: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Ericsson | imported from 3GU |
R4‑1908441 | CR to T 38.104: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Ericsson | imported from 3GU |
R4‑1908442 | Split of work on editorial corrections on BS RF (TS 38.104) | Ericsson | imported from 3GU |
R4‑1908443 | Split of work on editorial corrections on BS RF conformance (TS 38.141-1 and -2) | Ericsson | imported from 3GU |
R4‑1908444 | Status of Category B spurious emissions in 3GPP, ECC and ETSI | Ericsson | imported from 3GU |
R4‑1908445 | Draft CR to TS 38.141-2 on Spurious emission correction in FR2 | Ericsson | imported from 3GU |
R4‑1908446 | Draft CR to 38.104 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1908447 | Draft CR to 38.141-2 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1908448 | CR to 37.105 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1908449 | CR to 37.105 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1908450 | CR to 37.145-2 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1908451 | CR to 37.145-2 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1908452 | Alignment of Receiver spurious emission requirements for AAS BS | Ericsson | imported from 3GU |
R4‑1908453 | Spurious emission regulation for Base Stations in 7-24 GHz | Ericsson | imported from 3GU |
R4‑1908454 | BS Unwanted emission limits in NR frequency ranges | Ericsson | imported from 3GU |
R4‑1908455 | Narrrow band blocking for CATM1 and CATM2 | Qualcomm Inc | imported from 3GU |
R4‑1908456 | Clarification of mapping test uncertainties to appropriate subclauses in 38.141-1 | Futurewei | imported from 3GU |
R4‑1908457 | Corrections of the subclause mapping with 38.141-1 clause 4, annex C | Futurewei | imported from 3GU |
R4‑1908458 | Clarification of mapping test uncertainties to appropriate subclauses in 38.141-2 | Futurewei | imported from 3GU |
R4‑1908459 | Corrections of the subclause mapping with 38.141-2 clause 4, annex C | Futurewei | imported from 3GU |
R4‑1908460 | EVM annex corrections in 38.141-1 and 38.141-2 | Futurewei | imported from 3GU |
R4‑1908461 | Corrections to EVM 38.141-1 Annex H | Futurewei | imported from 3GU |
R4‑1908462 | Corrections to EVM 38.141-2 Annex L | Futurewei | imported from 3GU |
R4‑1908463 | Test model corrections in TS38.141-1 clause 4.9 | Futurewei | imported from 3GU |
R4‑1908464 | Requirement set applicability corrections 38.141-1 subclause 4.8 | Futurewei | imported from 3GU |
R4‑1908465 | Miscellaneous editorial corrections to TS38.141-2 | Futurewei | imported from 3GU |
R4‑1908466 | Test model corrections in TS38.141-2 clause 4.9 | Futurewei | imported from 3GU |
R4‑1908467 | Corrections to EVM calculations in 38.141-1 annex B and C | Futurewei | imported from 3GU |
R4‑1908468 | Clarification of test procedure for RE power control dynamic range | Futurewei | imported from 3GU |
R4‑1908469 | Clarification of fallback test models in 6.5.3 of 38.141-1 | Futurewei | imported from 3GU |
R4‑1908470 | Modulation fallback for total power dynamic range in 38.141-1 clause 6.3.3.4.2 | Futurewei | imported from 3GU |
R4‑1908471 | Clarification of fallback test models in 6.6.3 of 38.141-2 | Futurewei | imported from 3GU |
R4‑1908472 | How to enable TX diversity type UEs | Qualcomm Incorporated | imported from 3GU |
R4‑1908473 | Draft reply to LS on DL channel quality report for configured carrier in RRC connected mode | Qualcomm Incorporated | imported from 3GU |
R4‑1908474 | Draft Reply to LS on reference point for timing related measurements | Qualcomm Incorporated | imported from 3GU |
R4‑1908475 | General discussion on NR-U RRM requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908476 | On Cell Reselection Requirements for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908477 | On NB-IoT channel quality reporting in non-anchor carrier | Qualcomm Incorporated | imported from 3GU |
R4‑1908478 | On Conditional HO in LTE FeMob | Qualcomm Incorporated | imported from 3GU |
R4‑1908479 | On Conditional HO in NR Mobility Enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑1908480 | Enhanced MBB LTE handover interruption requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908481 | On measurement accuracy requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908482 | On measurement requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908483 | On MTC MSG3 and connected quality reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1908484 | On MTC preconfigured uplink resource (PUR) | Qualcomm Incorporated | imported from 3GU |
R4‑1908485 | On NB-IoT preconfigured uplink resource (PUR) | Qualcomm Incorporated | imported from 3GU |
R4‑1908486 | On NB-IoT RRM measurements in non-anchor carrier | Qualcomm Incorporated | imported from 3GU |
R4‑1908487 | Enhanced MBB NR handover interruption requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908488 | On PSCell addition/release in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908489 | On R16 eMTC WUS | Qualcomm Incorporated | imported from 3GU |
R4‑1908490 | On R16 NB-IoT WUS | Qualcomm Incorporated | imported from 3GU |
R4‑1908491 | On reference point for timing related measurements | Qualcomm Incorporated | imported from 3GU |
R4‑1908492 | On RRC Connection Mobility Control Requirements for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908493 | On RRM requirements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1908494 | On RSSI and Channel Occupancy measurements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908495 | On SCell Activation/de-activation Requirements for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908496 | Simulation results for RSS based RRM measurements for MTC | Qualcomm Incorporated | imported from 3GU |
R4‑1908497 | Draft CR Requirements for UL MIMO device and clarifications for basic requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1908498 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1908499 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1908500 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1908501 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1908502 | Corrections to test case for HD – FDD Inter frequency reselection case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm Incorporated | imported from 3GU |
R4‑1908503 | Corrections to test case for HD – FDD Inter frequency reselection case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm Incorporated | imported from 3GU |
R4‑1908504 | Corrections to test case for HD – FDD Inter frequency reselection case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm Incorporated | imported from 3GU |
R4‑1908505 | Corrections to test case for HD – FDD Inter frequency reselection case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm Incorporated | imported from 3GU |
R4‑1908506 | On Enabling Full TX UL Power | Qualcomm Incorporated | imported from 3GU |
R4‑1908507 | PI/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1908508 | Variable duplexer spacing | Qualcomm Incorporated | imported from 3GU |
R4‑1908509 | Draft CR on sections 6 and 7 of NR SDL band n29 | Qualcomm Incorporated | imported from 3GU |
R4‑1908510 | Discussion on Introduction of NR SDL band n29 | Qualcomm Incorporated | imported from 3GU |
R4‑1908511 | Motivation for new power class for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908512 | Draft CR on TX EVM test condition correction | Qualcomm Incorporated | imported from 3GU |
R4‑1908513 | On 160 MHz channel bandwidth support in NR-U | Intel Corporation | imported from 3GU |
R4‑1908514 | On transient period capability | Intel Corporation | imported from 3GU |
R4‑1908515 | Draft CR to TS 38.101-4: Introduction of NE-DC requirements | Intel Corporation | imported from 3GU |
R4‑1908516 | Draft CR to TS 38.101-4: Introduction of NR-NR DC requirements | Intel Corporation | imported from 3GU |
R4‑1908517 | Draft CR to TS 38.101-4: Corrections of FRC for FR2 PMI tests | Intel Corporation | imported from 3GU |
R4‑1908518 | Timing Error Consideration for CLI SRS-RSRP Measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908519 | RRM Core Requirements for CLI SRS-RSRP Measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908520 | Draft CR to 38.133: Cross Link Interference measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908521 | Simulation results for timing error impact on CLI measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908522 | Draft CR for TS 38.101-1: Editorial corrections for transmit ON/OFF time mask | MediaTek Inc. | imported from 3GU |
R4‑1908523 | Draft CR for TS 38.101-1: Corrections to inter-band CA and SUL OBB additional exception requirement | MediaTek Inc. | imported from 3GU |
R4‑1908524 | Draft CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | MediaTek Inc. | imported from 3GU |
R4‑1908525 | Draft CR for TS 38.101-3: Corrections to reference sensitivity exceptions due to receiver harmonic mixing for EN-DC in NR FR1 | MediaTek Inc. | imported from 3GU |
R4‑1908526 | CR to TS 37.104: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1908527 | CR to TS 37.104: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1908528 | CR to TS 37.141: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1908529 | CR to TS 37.141: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1908530 | Draft CR to TS38.101-2: Correction on CA nominal channel spacing (section 5.4A.1) | ZTE Corporation | imported from 3GU |
R4‑1908531 | CR to TS 37.105: Correction on operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1908532 | CR to TS 37.105: Correction on operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1908533 | CR to TS 37.145-1: Correction on SEM and operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1908534 | CR to TS 37.145-1: Correction on SEM and operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1908535 | CR to TS 37.145-2: Correction on SEM and operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1908536 | CR to TS 37.145-2: Correction on SEM and operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1908537 | CR to TS 37.145-1: Correction on multi-band test configurations | ZTE Corporation | imported from 3GU |
R4‑1908538 | CR to TS 37.145-1: Correction on multi-band test configurations | ZTE Corporation | imported from 3GU |
R4‑1908539 | Draft CR to TS38.141-2: Correct Note in OTA Tx spurious emission tables(section 6.7.5) | ZTE Corporation | imported from 3GU |
R4‑1908540 | Draft CR to TS38.141-2: Correction on OTA transmit ON/OFF power (section 6.5) | ZTE Corporation | imported from 3GU |
R4‑1908541 | Draft CR to TS38.141-2: Correction on the test configuration | ZTE Corporation | imported from 3GU |
R4‑1908542 | Discussion on Wgap for Rx requirements in NC operation and multiple bands | ZTE Corporation | imported from 3GU |
R4‑1908543 | Draft CR to TS38.104: Correction on gap size for non-contiguous spectrum or multiple bands for FR1 Rx requirements | ZTE Corporation | imported from 3GU |
R4‑1908544 | Draft CR to TS38.141-1: Correction on gap size for non-contiguous spectrum or multiple bands for FR1 Rx requirements | ZTE Corporation | imported from 3GU |
R4‑1908545 | CR to TS38.141-2: Correction on gap size for non-contiguous spectrum or multiple bands for FR1 Rx requirements | ZTE Corporation | imported from 3GU |
R4‑1908546 | Discussion on CS and TC for MSR new RAT combination | ZTE Corporation | imported from 3GU |
R4‑1908547 | CR to TR38.817-02: Correct on FR1 ?fOBUE | ZTE Corporation | imported from 3GU |
R4‑1908548 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1908549 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 3 bands DL with 2 bands UL | ZTE Corporation | imported from 3GU |
R4‑1908550 | Revision WID: Dual Connectivity (EN-DC) with 3 bands DL and 3 bands UL | ZTE Corporation | imported from 3GU |
R4‑1908551 | TR 37.716-33 skeleton: Dual Connectivity (EN-DC) with 3 bands DL and 3 bands UL | ZTE Corporation | imported from 3GU |
R4‑1908552 | Handling of NR FDD band NCCA REFSENS requirements | MediaTek Inc. | imported from 3GU |
R4‑1908553 | TP for TR 37.716-11-11: MSD and self-interference analyses for DC_3A_n38A | MediaTek Inc. | imported from 3GU |
R4‑1908554 | EIRP test procedure for beam correspondence | MediaTek Inc. | imported from 3GU |
R4‑1908555 | Draft CR for TR 38.810: Modification of TX beam peak direction search and EIRP spherical coverage | MediaTek Inc. | imported from 3GU |
R4‑1908556 | Co-existence scenarios for IAB | AT&T | imported from 3GU |
R4‑1908557 | IAB RF requirements | AT&T | imported from 3GU |
R4‑1908558 | IAB RRM requirements | AT&T | imported from 3GU |
R4‑1908559 | Guard band definition for NR based access to unlicensed spectrum | AT&T | imported from 3GU |
R4‑1908560 | TP for TR38.716-03-01 1 band UL for CA_n3-n8-n78 | Nubia Technology Co.,Ltd | imported from 3GU |
R4‑1908561 | TP for TR38.716-02-00: 1UL and 2UL for CA_n1-n8 | ZTE Corporation, | imported from 3GU |
R4‑1908562 | Draft CR to TS 38.101-1 Rel16:_Adding CA_n1A-n79C and CA_n3A-n79C | ZTE Corporation, | imported from 3GU |
R4‑1908563 | TP for TR37.716-11-11 for DC_1_n8 | ZTE Corporation, | imported from 3GU |
R4‑1908564 | TP for TR37.716-11-11 for DC_8_n39 | ZTE Corporation, | imported from 3GU |
R4‑1908565 | Draft CR to TS38.101-3_Adding DC_40C_n79A | ZTE Corporation, | imported from 3GU |
R4‑1908566 | TP for TR37.716-21-21 for DC_40_n41-n79 | ZTE Corporation, | imported from 3GU |
R4‑1908567 | TP for TR38.716-03-02 2 bands UL for CA_n3-n8-n78 | ZTE Corporation, | imported from 3GU |
R4‑1908568 | Discussion on NSA FDD-TDD high power UE | ZTE Corporation, | imported from 3GU |
R4‑1908569 | Draft CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation, | imported from 3GU |
R4‑1908570 | Draft CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation, | imported from 3GU |
R4‑1908571 | Draft CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation, | imported from 3GU |
R4‑1908572 | Draft CR to TS 38.101-1: corrections on Rx requirements for intra-band CA | ZTE Corporation, | imported from 3GU |
R4‑1908573 | Draft CR to TS 38.101-2: corrections on Rx requirements for intra-band CA | ZTE Corporation, | imported from 3GU |
R4‑1908574 | Draft CR to TS38.101-3_corrections on MSD table for EN-DC | ZTE Corporation, | imported from 3GU |
R4‑1908575 | Draft CR to TS38.101-3_OBW and transmit intermodulation for intra-band EN-DC | ZTE Corporation, | imported from 3GU |
R4‑1908576 | Motivation on new Basket WI for EN-DC including 3 bands inter-band NR CA | ZTE Corporation, | imported from 3GU |
R4‑1908577 | new proposed WID on EN-DC of LTE x bands (xDL_1UL, x=1,2,3) and NR 3 bands (3DL_1UL) band combinations | ZTE Corporation, | imported from 3GU |
R4‑1908578 | TP to TR 36.716-04-01: UE requirements for CA_1A-3A-7A-46A to CA_1A-3A-7A-46E | CHTTL | imported from 3GU |
R4‑1908579 | Draft CR of modification on reference to MIMO and BC requirements for inter-band EN-DC with FR2 for TS 38.101-3 | NTT DOCOMO INC. | imported from 3GU |
R4‑1908580 | TP for TR 36.716-03-02: CA_1-3-3-8, CA_1-7-8 and CA_1-7-7-8 xDL/2UL | CHTTL | imported from 3GU |
R4‑1908581 | TP for TR 37.716-21-21: UE requirements for DC_3-3_n1-n78, DC_7-7_n1-n78 | CHTTL | imported from 3GU |
R4‑1908582 | TP for TR 37.716-21-21: UE requirements for DC_3-3-7_n1-n78, DC_3-7-7_n1-n78, DC_3-3-7-7_n1-n78 | CHTTL | imported from 3GU |
R4‑1908583 | TP for TR 37.716-21-11: UE requirements for DC_3-8_n1, DC_7-8_n1 | CHTTL | imported from 3GU |
R4‑1908584 | Discussion on requirement for switching period between two FR1 uplink carriers | China Telecom | imported from 3GU |
R4‑1908585 | power control parameters for IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1908586 | simulation results for FR1 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1908587 | simulation results for FR2 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1908588 | Further discussion on system parameters for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1908589 | TP to the new TR related to NB-IoT: NB-IoT operating in NR guard-band | CHTTL | imported from 3GU |
R4‑1908590 | CR to TS 38.101-3 correction for the UL RB allocations of the MSD table | CHTTL, Skyworks Solutions Inc., MediaTek Inc. | imported from 3GU |
R4‑1908591 | Further discussion on solutions for EN-DC FDD-TDD High Power UE | CHTTL, China Unicom | imported from 3GU |
R4‑1908592 | [Draft] CR on applicability of FR2 PDSCH and CSI requirements for PTRS | NTT DOCOMO, INC., Ericsson | imported from 3GU |
R4‑1908593 | RLM design for NR URLLC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908594 | RRM requirements for CSI-RS based L3 measurement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908595 | Views on high-speed train tests for NR | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908596 | Number of additional DM-RS for high Doppler scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908597 | TP to TR 37.815: solutions for PC2 FDD-TDD HPUE | CHTTL, China Unicom | imported from 3GU |
R4‑1908598 | TP for TR 36.716-03-01: LTE CA_1-8-42 | SoftBank Corp. | imported from 3GU |
R4‑1908599 | TP for TR 36.716-03-01: LTE CA_3-8-42 | SoftBank Corp. | imported from 3GU |
R4‑1908600 | TP for TR 37.716-11-11: DC_8_n28 | SoftBank Corp. | imported from 3GU |
R4‑1908601 | TP for TR 37.716-21-11: EN-DC_1-8_n3 | SoftBank Corp. | imported from 3GU |
R4‑1908602 | TP for TR 37.716-21-11: EN-DC_8-42_n77 | SoftBank Corp. | imported from 3GU |
R4‑1908603 | [Draft] CR on applicability of FR2 PDSCH and CSI requirements for PTRS | NTT DOCOMO, INC., Ericsson | imported from 3GU |
R4‑1908604 | TP for TR 38.716-02-00: NR-CA_n3-n257 | SoftBank Corp. | imported from 3GU |
R4‑1908605 | TP for TR 38.716-02-00: NR-CA_n28-n257 | SoftBank Corp. | imported from 3GU |
R4‑1908606 | Draft CR for TS 38.101-3: Support of n257DGHI in DC_8_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1908607 | Views on normal PDSCH demodulation test for CA | DOCOMO Communications Lab. | imported from 3GU |
R4‑1908608 | TP to the new TR related to NB-IoT: TDD configurations | ZTE Corporation,Ericsson | imported from 3GU |
R4‑1908609 | TP to the new TR related to NB-IoT: guardband for mixed numerology | ZTE Corporation | imported from 3GU |
R4‑1908610 | Further discussion on the TAG misalignment between NB-IoT and NR | ZTE Corporation | imported from 3GU |
R4‑1908611 | TP to the new TR related to NB-IoT: TAG misalignment | ZTE Corporation | imported from 3GU |
R4‑1908612 | Further discussion on the TAG misalignment between LTE-MTC and NR | ZTE Corporation | imported from 3GU |
R4‑1908613 | TP to the new TR related to MTC: TAG misalignment | ZTE Corporation | imported from 3GU |
R4‑1908614 | TP to the new TR related to MTC: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1908615 | Discussion on LS on DL channel quality report for configured carrier in RRC connected mode | ZTE Corporation | imported from 3GU |
R4‑1908616 | Reply LS on DL channel quality report for configured carrier in RRC connected mode | ZTE Corporation | imported from 3GU |
R4‑1908617 | Draft CR to TS38.104: correction to the EVM annex (C.7) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1908618 | Further discussion on ACS interfering signal freq offset | ZTE Corporation | imported from 3GU |
R4‑1908619 | Draft CR to TS38.104: Correction on interferer frequency offset values for ACS | ZTE Corporation | imported from 3GU |
R4‑1908620 | Draft CR to TS38.141-1: Correction on interferer frequency offset values for ACS | ZTE Corporation | imported from 3GU |
R4‑1908621 | Draft CR to TS38.141-2: Correction on interferer frequency offset values for ACS | ZTE Corporation | imported from 3GU |
R4‑1908622 | CR to TS 38.101-1: Switching time mask between 1Tx and 2Tx | China Telecom | imported from 3GU |
R4‑1908623 | CR to TS 38.101-3: Switching time mask between 1Tx and 2Tx | China Telecom | imported from 3GU |
R4‑1908624 | CR to TS37.104: removal of Tx diversity for NR (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1908625 | CR to TS37.104: removal of Tx diversity for NR (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1908626 | CR to TS37.141: removal of Tx diversity for NR (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1908627 | CR to TS37.141: removal of Tx diversity for NR (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1908628 | Further discussion on EVM window length requirement | ZTE Corporation | imported from 3GU |
R4‑1908629 | Draft CR to TS38.104: Corrections on EVM window length (Annex B.5.2, C.5.2) | ZTE Corporation | imported from 3GU |
R4‑1908630 | Draft CR to TS38.141-1: Corrections on EVM window length (Annex 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1908631 | Draft CR to TS38.141-2: Corrections on EVM window length (Section 6.6.3) | ZTE Corporation | imported from 3GU |
R4‑1908632 | Draft CR to TS38.101-1: Corrections on EVM window length (Section F.5) | ZTE Corporation | imported from 3GU |
R4‑1908633 | Draft CR to TS38.101-2: Corrections on EVM window length (Section F.5) | ZTE Corporation | imported from 3GU |
R4‑1908634 | CR to TS37.145-1: Corrections on ICS requirement (Section 7.8.5) | ZTE Corporation | imported from 3GU |
R4‑1908635 | CR to TS37.145-1: Corrections on ICS requirement (Section 7.8.5) | ZTE Corporation | imported from 3GU |
R4‑1908636 | CR to TS37.145-2: Corrections on ICS requirement (Section 7.9.5) | ZTE Corporation | imported from 3GU |
R4‑1908637 | CR to TS37.145-2: Corrections on ICS requirement (Section 7.9.5) | ZTE Corporation | imported from 3GU |
R4‑1908638 | CR to TS37.104 Corrections on NBB requirement (section 7.4.2) | ZTE Corporation | imported from 3GU |
R4‑1908639 | CR to TS37.104 Corrections on NBB requirement (section 7.4.2) | ZTE Corporation | imported from 3GU |
R4‑1908640 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1908641 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1908642 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1908643 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1908644 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1908645 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1908646 | CR to TR 38.817-02: Background on the EVM | ZTE Corporation | imported from 3GU |
R4‑1908647 | Draft CR to TS38.104: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1908648 | Draft CR to TS38.141-1: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1908649 | Draft CR to TS38.141-2: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1908650 | FR2 Test Equipment MU values for BS demodulation conformance testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1908651 | CR to TS37.141 Corrections on NBB requirement (section 7.4) | ZTE Corporation | imported from 3GU |
R4‑1908652 | CR to TS37.141 Corrections on NBB requirement (section 7.4) | ZTE Corporation | imported from 3GU |
R4‑1908653 | Remaining issues on general aspects for BS demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908654 | PTRS configuration for NR FR2 PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908655 | Draft CR to TS 38.104 Correction on PUCCH second hopping PRB configuration | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908656 | Draft CR to TS 38.141-1 Correction on PUCCH second hopping PRB configuration | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908657 | Draft CR to TS 38.141-2 Correction on PUCCH second hopping PRB configuration | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908658 | NR PUSCH requirements for high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908659 | NR PRACH requirements for high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908660 | Feasibility evaluation for NR FR2 DL256QAM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908661 | BS demodulation for LTE high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908662 | Views on 30% TP test point for BS demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908663 | CR to introduce 30MHz bandwidth of n41 into TS 38.101-1 | KDDI Corporation | imported from 3GU |
R4‑1908664 | SCell activation delay requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908665 | CR for SCell activation delay requirements (section 8.3.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908666 | CR for PSCell addition delay requirements (section 8.9.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908667 | TCI state switching requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908668 | CR for TCI state switching requirements (section 8.10) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908669 | UE switching and interruption times for dynamic adaptations in UE Power Saving schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908670 | UE Requirements for CHO in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908671 | Multi-RAT Dual-Connectivity and Carrier Aggregation enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908672 | NR SCell activation delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908673 | Reply LS on maximum allowed SCell activation delay for Rel16 CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908674 | Reply LS on NR fast SCell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908675 | UE Requirements for CHO in LTE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908676 | CR to introduce 30MHz bandwidth of n41 to TS 38.104 | KDDI Corporation | imported from 3GU |
R4‑1908677 | Work plan for RRM part of NR support for high speed train scenario | CMCC | imported from 3GU |
R4‑1908678 | Discussion on UE demodulation for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1908679 | Discussion on BS demodulation for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1908680 | WF on demodulation for NR HST | CMCC | imported from 3GU |
R4‑1908681 | Draft CR on PSCell addition delay in TS38.133 (section 8.9.2) | CMCC | imported from 3GU |
R4‑1908682 | Draft CR on TS38.133 for Psharing factor for BFD, CBD and L1-RSRP (section 8.5.2, 8.5.5, 9.5.4.1) | CMCC | imported from 3GU |
R4‑1908683 | Draft CR on TS38.133 on conditions for FR1 inter-frequency measurement accuracy (section 10.1.4, 10.1.9, 10.1.14, B.2.3) | CMCC | imported from 3GU |
R4‑1908684 | Discussion on UE demodulation enhancement in LTE for high speed scenario | CMCC | imported from 3GU |
R4‑1908685 | Simulation results for UE demodulation in CA for high speed scenario | CMCC | imported from 3GU |
R4‑1908686 | TR 36.716-03-02 v0.6.0 LTE-A x bands DL (x=3,4,5) with 2 bands UL inter-band CA in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1908687 | Revised WID on x bands (x=3,4,5) DL with 2 bands UL inter-band CA in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1908688 | Introduction of LTE-A inter-band CA Rel-16 for new x bnads (x=3,4,5) DL with 2 bands UL to TS36.101 | LG Electronics France | imported from 3GU |
R4‑1908689 | CR to TS 37.141: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1908690 | CR to TS 37.141: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1908691 | Editorial CR on Section 7.5 and 7.6(MTTR and MRTD) | LG Electronics | imported from 3GU |
R4‑1908692 | Editorial correction on SUO mark for BC 3+78 | Apple (UK) Limited | imported from 3GU |
R4‑1908693 | TR 37.716-21-21 v0.6.0 update: LTE(xDL/1UL)+ NR(2DL/1UL) DC in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1908694 | Revised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1908695 | TP for TR38.716-03-01: Requirements for CA_n66A-n70A-n71A, CA_n66B-n70A-n71A, and CA_n66(2A)-n70A-n71A | Dish Network | imported from 3GU |
R4‑1908696 | TR 38.886 v0.2.0 for 5G V2X with NR sidelink | LG Electronics France | imported from 3GU |
R4‑1908697 | Discussion on NR V2X timing requirement | MediaTek inc. | imported from 3GU |
R4‑1908698 | Further discussion on NR V2X RRM requirement scope | MediaTek inc. | imported from 3GU |
R4‑1908699 | Discussion on NR V2X synchonization requirement | MediaTek inc. | imported from 3GU |
R4‑1908700 | Discussion on NR V2X measurement requirement | MediaTek inc. | imported from 3GU |
R4‑1908701 | Discussion on remaining issues in TCI switching | MediaTek inc. | imported from 3GU |
R4‑1908702 | draftCR on TS38.133 for TCI state switching(section 8.10) | MediaTek inc. | imported from 3GU |
R4‑1908703 | draftCR on TS38.133 for Applicability for intra-band FR2(section 3.6.3) | MediaTek inc. | imported from 3GU |
R4‑1908704 | draftCR on TS38.133 for BWP switch test case(section A.5.5.6.1.1) | MediaTek inc. | imported from 3GU |
R4‑1908705 | draftCR on TS38.133 for BWP switch test case(section A.7.5.6.1.3) | MediaTek inc. | imported from 3GU |
R4‑1908706 | TP for TR38.716-02-00: Requirements for CA_n66B-n71A | Dish Network | imported from 3GU |
R4‑1908707 | Draft CR to TS38.101-1: corrections on the receiver spurious emission (section 7.9) | ZTE Corporation | imported from 3GU |
R4‑1908708 | Draft CR to TS38.101-2: corrections on the receiver spurious emission (section 7.9) | ZTE Corporation | imported from 3GU |
R4‑1908709 | Correction to B70 UE Co-existence | Dish Network | imported from 3GU |
R4‑1908710 | Draft LS reply on supported BW for initial BWP | Ericsson | imported from 3GU |
R4‑1908711 | Verification of Xscale (scaling of EN-DC output power) | Ericsson | imported from 3GU |
R4‑1908712 | Applicability of SA requirements for UE configured with EN-DC (Pcmax) | Ericsson | imported from 3GU |
R4‑1908713 | Amendment of the absolute power tolerance requirement | Ericsson | imported from 3GU |
R4‑1908714 | Correction of power tolerances for configured output power | Ericsson | imported from 3GU |
R4‑1908715 | Introduction of P-Max for FR2 | Ericsson | imported from 3GU |
R4‑1908716 | WB1 and WB2 channel arrangement and unwanted emissions | Ericsson | imported from 3GU |
R4‑1908717 | UE transmitter requirements for 5 GHz NR-U | Ericsson | imported from 3GU |
R4‑1908718 | Enhancement of MPE mitigation for avoiding link failure | Ericsson, Sony | imported from 3GU |
R4‑1908719 | Verification of beam correspondence during initital access | Ericsson, Sony | imported from 3GU |
R4‑1908720 | Timing requiremens for FDD bands with variable duplex (and shared uplink) | Ericsson | imported from 3GU |
R4‑1908721 | Increasing EN-DC power for FDD-TDD PC2 and PC3 | Ericsson | imported from 3GU |
R4‑1908722 | Correction to B70 UE Co-existence | Dish Network | imported from 3GU |
R4‑1908723 | Correction to B70 UE Co-existence | Dish Network | imported from 3GU |
R4‑1908724 | TP on summary of self-interference analysis for new x bands DL (X=3,4,5) with 2 bands UL inter-band CA in Rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1908725 | Antenna isolation and A-MPR for B41/n41 EN-DC | LG Electronics Finland | imported from 3GU |
R4‑1908726 | Draft CR to TS38.104 editorial corrections on G-FRC (section 7.2,7.3,10.3,10.4) | ZTE Corporation | imported from 3GU |
R4‑1908727 | Draft CR to TS38.141-1 editorial corrections on G-FRC (section 7.2,7.3) | ZTE Corporation | imported from 3GU |
R4‑1908728 | CR to TS37.145-1 editorial corrections on G-FRC (section 7.2,7.3) | ZTE Corporation | imported from 3GU |
R4‑1908729 | CR to TS37.145-1 editorial corrections on G-FRC (section 7.2,7.3) | ZTE Corporation | imported from 3GU |
R4‑1908730 | CR to TS37.145-2 editorial corrections on G-FRC (section 7.2,7.3,7.4) | ZTE Corporation | imported from 3GU |
R4‑1908731 | CR to TS37.145-2 editorial corrections on G-FRC (section 7.2,7.3,7.4) | ZTE Corporation | imported from 3GU |
R4‑1908732 | Characteristics of Interfering signal for Contiguous Intra-band CA Class B | Dish Network | imported from 3GU |
R4‑1908733 | IAB simulation results for Layout 1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908734 | Work plan on the variable duplex | Huawei, HiSilicon | imported from 3GU |
R4‑1908735 | System parameters for variable duplex | Huawei, HiSilicon, Vodafone, Orange | imported from 3GU |
R4‑1908736 | UE RF requirements analysis for variable duplex | Huawei, HiSilicon, Vodafone, Orange | imported from 3GU |
R4‑1908737 | Revised WID on variable duplex | Huawei, HiSilicon | imported from 3GU |
R4‑1908738 | Way forward on variable duplex | Huawei, HiSilicon | imported from 3GU |
R4‑1908739 | Correction Inter-band CA configurations | Dish Network | imported from 3GU |
R4‑1908740 | TP to TR 38.820: Addition of BS PA trends conclusion in subclause 5.4.1 | Ericsson | imported from 3GU |
R4‑1908741 | CR to TR 37.843: Improvement of error contribution decsription for RC in Annex E.5 | Ericsson | imported from 3GU |
R4‑1908742 | Draft CR to TS 38.141-2: Addition of RC test method in test procedures for output power, ACLR and OBUE in subclause 6.3.4.2, 6.7.3.4.2 and 6.7.4.4.2 | Ericsson | imported from 3GU |
R4‑1908743 | CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2 | Ericsson | imported from 3GU |
R4‑1908744 | CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2 | Ericsson | imported from 3GU |
R4‑1908745 | On different options for how to document RC in test procedures | Ericsson | imported from 3GU |
R4‑1908746 | Draft CR to 38.141-2: Improvement of RC test procedure in subclause 6.7.5.2.4.2, 6.7.5.4.4.2 and 7.7.4.2 | Ericsson | imported from 3GU |
R4‑1908747 | CR to 37.145-2: Improvement of RC test procedure in subclause 6.7.6.2.4.2 and subclause 7.7.4.2 | Ericsson | imported from 3GU |
R4‑1908748 | CR to 37.145-2: Improvement of RC test procedure in subclause 6.7.6.2.4.2 and subclause 7.7.4.2 | Ericsson | imported from 3GU |
R4‑1908749 | Draft CR to TS 38.141-2: Improvements of OTA out-of-band blocking in subclause 7.6 | Ericsson | imported from 3GU |
R4‑1908750 | Draft CR to TS 38.141-2: Improvement of requirement overview tables in subclause 4.1.1 | Ericsson | imported from 3GU |
R4‑1908751 | Draft CR to TS 38.141-2: Corrections related to manufacturer declarations in subclause 4.6 | Ericsson | imported from 3GU |
R4‑1908752 | Draft CR to TS 38.141-2: Improvements of description of measuring noise close to the noise floor in Annex K | Ericsson | imported from 3GU |
R4‑1908753 | TP to TR 38.820: Adding reference architecture for base station requirements sets in subclause 7.2 | Ericsson | imported from 3GU |
R4‑1908754 | TP to TR 38.820: Addition of technical background and guidance for OOB blocking in subclause 7.4.2 | Ericsson | imported from 3GU |
R4‑1908755 | Draft CR to TS 38.141-2: Improvement of Radiated transmit power in subclause 6.2 and Annex B | Ericsson | imported from 3GU |
R4‑1908756 | CR to TR 37.843: Improvement of RC technical background in clause 2 and subclause 10.5.2.3A | Ericsson | imported from 3GU |
R4‑1908757 | TP to TR 38.820: PA parameter dependency for different example frequencies in subclause 5.4.3 | Ericsson | imported from 3GU |
R4‑1908758 | TP to TR 38.820: PA power scaling and AAS dependencies in subclause 5.4.2 | Ericsson | imported from 3GU |
R4‑1908759 | TP to TR 38.820: Phase noise for different example frequencies in subclause 5.4.4 | Ericsson | imported from 3GU |
R4‑1908760 | Further elaboration on PA aspects for 10 GHz example frequency | Ericsson | imported from 3GU |
R4‑1908761 | Draft CR to TS 38.141-2: Alignment between NR and AAS in subclause 6.2.4.1 | Ericsson | imported from 3GU |
R4‑1908762 | Draft CR to TS 38.141-2: Additional information about alignment for TRP measurement in Annex I.1 | Ericsson | imported from 3GU |
R4‑1908763 | CR to TS 37.145-2: Additional information about alignment for TRP measurement in Annex F.1 | Ericsson | imported from 3GU |
R4‑1908764 | CR to TS 37.145-2: Additional information about alignment for TRP measurement in Annex F.1 | Ericsson | imported from 3GU |
R4‑1908765 | TR37.825 v0.2.0 High power UE (power class 2) for EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1908766 | Proposal on release independent issue for TDD+TDD EN-DC HPUE | CMCC | imported from 3GU |
R4‑1908767 | TP for TR37.825 for release independent issue | CMCC | imported from 3GU |
R4‑1908768 | New WID on adding 15MHz channel bandwidth for LTE Band8 | CMCC | imported from 3GU |
R4‑1908769 | New WID on introduction of 2010-2025MHz SUL band for NR | CMCC | imported from 3GU |
R4‑1908770 | Further discussion on RF architecture of IAB | CMCC | imported from 3GU |
R4‑1908771 | Discussion on introducing IAB RF conductive requirements | CMCC | imported from 3GU |
R4‑1908772 | Discussion on IAB RF requirements | CMCC | imported from 3GU |
R4‑1908773 | Discussion on synchronized operation definition in BS specifications | CMCC | imported from 3GU |
R4‑1908774 | DraftCR to 38.104: Editorial Corrections to redudant units in subclause 10.8.3 | CMCC | imported from 3GU |
R4‑1908775 | Discussion on CLI measurement with measurement gap | LG Electronics Inc. | imported from 3GU |
R4‑1908776 | Finalizing Generic Intra-band Contiguous CA Class B requirements | Dish Network | imported from 3GU |
R4‑1908777 | Reply LS on measurement gap for SRS-RSRP or CLI-RSSI measurements | LG Electronics Inc. | imported from 3GU |
R4‑1908778 | Measurement accuracy and simulation results for SRS-RSRP | LG Electronics Inc. | imported from 3GU |
R4‑1908779 | Finalizing the Intra-band CA requirements for bands <2700MHz | Dish Network | imported from 3GU |
R4‑1908780 | Discussion on reporting range for CLI measurement | LG Electronics Inc. | imported from 3GU |
R4‑1908781 | Discussion on scheduling restriction for CLI measurement | LG Electronics Inc. | imported from 3GU |
R4‑1908782 | Draft CR: Correction to n70 UE Co-existence | Dish Network | imported from 3GU |
R4‑1908783 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for EN-DC FR1 (section A.4.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1908784 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for SA FR1 (section A.6.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1908785 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for EN-DC FR2 (section A.5.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1908786 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for SA FR2 (section A.7.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1908787 | MRTD For Intra-band NC CA | Qualcomm Incorporated | imported from 3GU |
R4‑1908788 | Channel Bandwidth Signaling and UE Behavior | Qualcomm Incorporated | imported from 3GU |
R4‑1908789 | Draft Reply LS on supported BW for initial BWP | Qualcomm Incorporated | imported from 3GU |
R4‑1908790 | MRTD For Inter-band FR2 CA | Qualcomm Incorporated | imported from 3GU |
R4‑1908791 | Draft CR on Intra-band non-contiguous CA MRTD (Section 7.6.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1908792 | Discussion on dynamic maxUplinkDutyCycle for FR2 in Rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1908793 | TP on adjacent channel co-existence scenarios and parameters for NR V2X service on FR1 | LG Electronics Finland | imported from 3GU |
R4‑1908794 | Discussion on PRACH BS demodulation issues in HST scenarios for Rel-16 NR | Ericsson | imported from 3GU |
R4‑1908795 | Initial coexistence simulation results of NR V2X for ITS band | LG Electronics Finland | imported from 3GU |
R4‑1908796 | RRM requirements for conditional handover | NEC | imported from 3GU |
R4‑1908797 | SCell activation delay in FR2 band when no other cell is active in FR2 band | NEC | imported from 3GU |
R4‑1908798 | TCI state known status mismatch handling | NEC | imported from 3GU |
R4‑1908799 | Draft CR to 38.133: SCell activation delay requirements on FR2 band | NEC | imported from 3GU |
R4‑1908800 | Draft CR to 38.133: TCI state known status mismatch handling | NEC | imported from 3GU |
R4‑1908801 | Scheduling restriction for CLI measurement | NEC | imported from 3GU |
R4‑1908802 | Draft CR to 38.104: Correction on regional requirements (4.5) | NEC | imported from 3GU |
R4‑1908803 | Draft CR to 38.141-1: Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1908804 | Draft CR to 38.141-2: Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1908805 | Draft CR to 38.104: Limits in FCC title 47 for OTA operating band unwanted emissions (9.7) | NEC | imported from 3GU |
R4‑1908806 | Draft CR to 38.141-2: Correction on OTA OBUE for BS type 2-O (6.7) | NEC | imported from 3GU |
R4‑1908807 | Draft CR to 38.141-2: Correction on OTA spurious emissions for BS type 2-O (6.7) | NEC | imported from 3GU |
R4‑1908808 | Initial coexistence simulation results of NR V2X for licensed band | LG Electronics Finland | imported from 3GU |
R4‑1908809 | Discussion on NR V2X UE RF requirements | LG Electronics Finland | imported from 3GU |
R4‑1908810 | 1PA Back-off Measurements for PC2&3 intra-band contiguous and non-contiguous ENDC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908811 | TP on simulation results of NR V2X | LG Electronics Finland | imported from 3GU |
R4‑1908812 | TP on MU budget analysis of 2D Compact Range for BS OTA Testing | CAICT | imported from 3GU |
R4‑1908813 | draft CR to TR 37.843 Addition of 2D Compact Range MU evaluation | CAICT SRTC | imported from 3GU |
R4‑1908814 | Draft CR to TS38.101-2 for Rx RF requirements | LG Electronics Finland | imported from 3GU |
R4‑1908815 | Discussion on 2UL Allocation Types and their Impact on Required PA Back-off and MSD | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908816 | n29 introduction to 38.101 | Dish Network | imported from 3GU |
R4‑1908817 | draft CR to correct protected band of band26 related EN-DC | KDDI Corporation | imported from 3GU |
R4‑1908818 | FR2 UE Beam Correspondence enhancements in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908819 | UE Beam Management enhancements to help in FR2 MPE issues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908820 | Mitigating Radio Link Failures due to MPE on FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908821 | Draft LS on enhanced FR2 MPE mitigation solutions for avoiding radio link failures and connection releases in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908822 | Discussion on Improved Isolation for 2PA Intra-band ENDC with Initial Measurement Results | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908823 | CR for measurement restriction for CSI-RS based measurements (section 8.1.3.3, 8.5.3.3, 9.5.5.2) | MediaTek inc. | imported from 3GU |
R4‑1908824 | Discussion on the first SCell activation in FR2 | MediaTek inc. | imported from 3GU |
R4‑1908825 | Discussion on TCI switch requirement | MediaTek inc. | imported from 3GU |
R4‑1908826 | CR for TCI state switching delay (section 8.10.3) | MediaTek inc. | imported from 3GU |
R4‑1908827 | Discussion on QCL relation in requirements | MediaTek inc. | imported from 3GU |
R4‑1908828 | CR for CSI-RS based beam failure detection (section 8.5.3.2) | MediaTek inc. | imported from 3GU |
R4‑1908829 | CR for SSB based candidate beam detection (section 8.5.5.2) | MediaTek inc. | imported from 3GU |
R4‑1908830 | Maintenance CR for section 9.5 on L1-RSRP measurements for reporting | MediaTek inc. | imported from 3GU |
R4‑1908831 | FR2 SNR side conditions setup for RLM testing | MediaTek inc. | imported from 3GU |
R4‑1908832 | CR on SSB based RLM test cases for EN-DC FR1 (Section A.4.5.1) | MediaTek inc. | imported from 3GU |
R4‑1908833 | CR on SSB based RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1908834 | CR on SSB based RLM test cases for SA FR1 (Section A.6.5.1) | MediaTek inc. | imported from 3GU |
R4‑1908835 | CR on SSB based RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1908836 | SNR side condition setup for link recovery test | MediaTek inc. | imported from 3GU |
R4‑1908837 | Discussion on radio link monitoring requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1908838 | Discussion on measurement requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1908839 | Initial Measurement Results for Intra-band Contiguous NR UL CA for FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908840 | Proposals on Intra-band NR UL CA Requirements for FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908841 | Draft CR to add simultaneous RX/TX capability requirements in R15 TS 38.101-1 | CMCC | imported from 3GU |
R4‑1908842 | Draft CR to add simultaneous RX/TX capability requirements in R15 TS 38.101-3 | CMCC | imported from 3GU |
R4‑1908843 | FR1 IAB co-existence study | CMCC | imported from 3GU |
R4‑1908844 | NR-U] On NR-U UE Power Class and MPR evaluation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908845 | CR to introduce 30MHz bandwidth of n41 to TS 38.104 | KDDI Corporation | imported from 3GU |
R4‑1908846 | Further Discussion on UL LBT for Wideband Operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908847 | On NR-U SU for single CC and wideband operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908848 | 2PA Back-off Measurements for NS01&04 intra-band contiguous and non-contiguous ENDC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1908849 | CR for extending HST-SFN tests to CA in Rel-16 | Ericsson | imported from 3GU |
R4‑1908850 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1908851 | Doppler shift evaluation for LTE HST Bidirectional Scenario | Ericsson | imported from 3GU |
R4‑1908852 | CR to 36.104 on LTE HST PUSCH conditions | Ericsson | imported from 3GU |
R4‑1908853 | Discussion on the definition of EMC requirements for IAB | Ericsson | imported from 3GU |
R4‑1908854 | CR to 37.113 Amendments to Section 2 (References) | Ericsson | imported from 3GU |
R4‑1908855 | CR to 37.113 Editorial Corrections | Ericsson | imported from 3GU |
R4‑1908856 | Discussion on the simplification of EMC Test Configuration Cases for MultiRATs | Ericsson | imported from 3GU |
R4‑1908857 | CR to 37.114 Amendments to Section 2 (References) | Ericsson | imported from 3GU |
R4‑1908858 | CR to 37.114 Editorial Corrections | Ericsson | imported from 3GU |
R4‑1908859 | Draft CR to 38.113 Amendments to Section 2 (References) | Ericsson | imported from 3GU |
R4‑1908860 | Draft CR to 38.113 Editorial Corrections | Ericsson | imported from 3GU |
R4‑1908861 | Draft CR to 38.113 Adding IAB to scope | Ericsson | imported from 3GU |
R4‑1908862 | Discussion on different schemes for PC2 EN-DC (FDD+TDD) | vivo | imported from 3GU |
R4‑1908863 | Remaining issues on requirements for TCI state switching | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908864 | Clarification on QCL assumption for RRM requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908865 | [draft] Clarification CR on applicability for QCL assumption for RRM requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908866 | UE behavior on Random access procedure during measurement gap | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908867 | [draft] Clarification CR on random access procedure during measurement gap | NTT DOCOMO, INC., Ericsson, Nokia | imported from 3GU |
R4‑1908868 | UE demodulation tests for single tap HST and multi-path with 500km/h velocity | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908869 | Handover delay and interruption time for conditional handover | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908870 | Discussion on environmental condition for NR MIMO OTA in FR1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1908871 | IAB MT receiver blocking analysis in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908872 | Simulation results for the homogeneous scenario in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908873 | Simulation results for the heterogeneous scenario in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1908874 | Synchronization raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908875 | Channel raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1908876 | TP for TR 37.815: Conclusion of SI for FDD+TDD EN-DC HPUE | China Unicom | imported from 3GU |
R4‑1908877 | NB-IoT - NR coexistence : Testability considerations | Ericsson | imported from 3GU |
R4‑1908878 | NB-IoT - NR coexistence : Power boosting considerations | Ericsson | imported from 3GU |
R4‑1908879 | NB-IoT - NR coexistence : operating modes definitions | Ericsson | imported from 3GU |
R4‑1908880 | BS demodulation simulations results | Ericsson | imported from 3GU |
R4‑1908881 | BS demodulation simulations results for UCI on PUSCH | Ericsson | imported from 3GU |
R4‑1908882 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1908883 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1908884 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1908885 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1908886 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1908887 | Draft CR to TS 38.141-1 Manufacturer declaration for BS demodulation | Ericsson | imported from 3GU |
R4‑1908888 | Draft CR to TS 38.141-2 Manufacturer declaration for BS demodulation | Ericsson | imported from 3GU |
R4‑1908889 | BS demodulation - remaining open issues | Ericsson | imported from 3GU |
R4‑1908890 | Band n1 - 30MHz CBW - Work Plan | Ericsson | imported from 3GU |
R4‑1908891 | Band n1 - 30MHz CBW - Draft CR to TS 38.104 | Ericsson | imported from 3GU |
R4‑1908892 | Band n1 - 30MHz CBW - UE RF REFSENS | Ericsson | imported from 3GU |
R4‑1908893 | Band n1 - 30MHz CBW - UE RF spurious and A-MPR simulation assumptions | Ericsson | imported from 3GU |
R4‑1908894 | On PSFCH AGC settling time for NR V2X | LG Electronics Finland | imported from 3GU |
R4‑1908895 | Interruption requirements with BWP switch on multiple CCs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908896 | 38.133 CR on interruption requirements for BWP switch on multiple CCs (8.2.1.2.7, 8.2.2.2.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908897 | 36.133 CR on interruption requirements for BWP switch on multiple CCs (7.32.2.7, 7.36.2.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908898 | CR on Removing SUL from nbr of serving carriers for NR-DC Rel-15 (3.6.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908899 | Discussion on reselection criterion in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908900 | CR on reselection criterion in idle mode Rel-15 (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908901 | CR on remove the overlapping description in RLM Rel-15 (8.1.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908902 | CR on TBD value in link recovery Rel-15 (8.5.2.1, 8.5.6.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908903 | Draft CR for TAref definition Rel-15 (7.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908904 | editorial CR for section 5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908905 | editorial CR for section 8.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908906 | editorial CR for section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908907 | editorial CR for section 9.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908908 | editorial CR for interruption TCs (A.4.5.2, A.5.5.2, A.6.5.2, A.7.5.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908909 | editorial CR for Scell activation and deactivation TCs (A.4.5.3, A.5.5.3, A.6.5.3, A.7.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908910 | editorial CR for PSCell addition and release delay TCs (A.4.5.7, A.5.5.7) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908911 | TC update for CSI-based RLM EN-DC in FR1 (A.4.5.1.5, A.4.5.1.6, A.4.5.1.7, A.4.5.1.8) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908912 | TC update for CSI-based RLM SA in FR1 (A.6.5.1.5, A.6.5.1.6, A.6.5.1.7, A.6.5.1.8) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908913 | TC update for EN-DC FR1 RRC-based BWP switching A.4.5.6.2.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908914 | Noc update for EN-DC Scell activation/deactivation delay in FR2 A.5.5.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908915 | Noc updating for BWP switch test cases (A.5.5.6.1.2, A.5.5.6.2.1, A.7.5.6.2.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908916 | Noc updating for CSI-based RLM in EN-DC FR2 (A.5.5.1.5, A.5.5.1.6, A.5.5.1.7, A.5.5.1.8) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908917 | Noc updating for CSI-based RLM in SA FR2 (A.7.5.1.5, A.7.5.1.6, A.7.5.1.7, A.7.5.1.8) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908918 | TC scheduling restriction during SSB based BFD and LR in FR2 in EN-DC and SA (A.5.5.5.5, A.7.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908919 | OTA synchronization accuracy for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908920 | Range and graularity of T_delta for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908921 | T_delta definition for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908922 | Reply LS on on clarification of OTA timing alignment for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908923 | Discussion on NR CA PDSCH normal demodulation | CMCC | imported from 3GU |
R4‑1908924 | Discussion on NR CA PDSCH normal demodulation | CMCC | imported from 3GU |
R4‑1908925 | TP for TR 36.716-03-01: CA_2-7-29 | Huawei, HiSilicon | imported from 3GU |
R4‑1908926 | CR for 36.101: adding spurious emission band UE co-existence for CA_1-41 | Huawei, HiSilicon | imported from 3GU |
R4‑1908927 | CR for 36.101: adding spurious emission band UE co-existence for CA_1-41 | Huawei, HiSilicon | imported from 3GU |
R4‑1908928 | CR for 36.101: correct bandwidth configuration for CA_2-7-7-66-66 | Huawei, HiSilicon | imported from 3GU |
R4‑1908929 | [CA] DraftCR for 38.101-1: adding BCS1 for relative inter-band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1908930 | [CA] TP for TR 38.716-02-00: adding BCS1 for relative inter-band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1908931 | TP for TR 38.716-02-00: CA_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1908932 | TP for TR 38.716-01-01: DL_n78(2A)_UL_n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1908933 | TP for TR 38.716-01-01: DL_n77(2A)_UL_n77A | Huawei, HiSilicon | imported from 3GU |
R4‑1908934 | TP for TR 38.716-01-01: DL_n3(2A)_UL_n3A | Huawei, HiSilicon | imported from 3GU |
R4‑1908935 | TP for TR 38.716-01-01: DL_n1B_UL_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1908936 | TP for TR 38.716-01-01: DL_n7(2A)_UL_n7A | Huawei, HiSilicon | imported from 3GU |
R4‑1908937 | TP for TR 37.716-11-11: DL_40A_n1A_UL_40A_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1908938 | TP for TR 37.716-21-11: DC_3-40_n1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908939 | TP for TR 37.716-21-11: DC_7-40_n1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908940 | Discussion on MSD and updated TP for TR 37.716-11-11 DC_1_n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1908941 | TP for TR 37.716-11-11 DL_2A_n38A_UL_2A_n38A | Huawei, HiSilicon | imported from 3GU |
R4‑1908942 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1908943 | [SUL] CR on SUL band combinations into Rel-16 TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908944 | [SUL] CR on SUL band combinations into Rel-16 TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1908945 | updated TP for TR 37.716-00-00 | Huawei, HiSilicon | imported from 3GU |
R4‑1908946 | CR on Introduction of SUL band n89 into Rel-16 TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908947 | CR on Introduction and Protection of SUL band n89 into TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1908948 | CR on Protection of SUL band n89 to TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908949 | CR on Protection of SUL bands to TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1908950 | CR on Protection of SUL band n89 to TS 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1908951 | CR on Protection of SUL band n89 to TS 36.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1908952 | CR on Protection of SUL band n89 to TS 37.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1908953 | CR on Protection of SUL band n89 to TS 37.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1908954 | CR on Protection of SUL band n89 to TS 37.105 | Huawei, HiSilicon | imported from 3GU |
R4‑1908955 | CR on Protection of SUL band n89 to TS 37.145-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908956 | CR on Protection of SUL band n89 to TS 37.145-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1908957 | draft CR for 38.101-1: n5 spurious emissions for UE co-existence | Huawei, HiSilicon | imported from 3GU |
R4‑1908958 | draft CR for 38.101-1: adding operating band for intra-band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1908959 | draft CR for 38.101-3: adding note for spurious emission band UE co-existence | Huawei, HiSilicon | imported from 3GU |
R4‑1908960 | draft CR for 38.101-3:clean up for inter-band NE-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1908961 | draft CR for 38.101-3:specifying occupied bandwidth for intra-band non-contiguous ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1908962 | draft CR for 38.101-1: editorial correction for NBB, ACS and In-band emissions | Huawei, HiSilicon | imported from 3GU |
R4‑1908963 | [DL CA]discussion on Rx requirement for NR intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1908964 | [DL CA]Draft CR for 38.101-1: band-specific requirement for CA_n77(2A) and CA_n78(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1908965 | [DL CA]Draft CR for 38.101-1: Rx requirement for NR intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1908966 | [DL CA]discussion on Rx requirement for NR intra-band contiguous CA with NR Bandwidth class B and F | Huawei, HiSilicon | imported from 3GU |
R4‑1908967 | [DL CA]Draft CR for 38.101-1: ACS requirement for intra-band contiguous CA with NR Bandwidth class B and class F | Huawei, HiSilicon | imported from 3GU |
R4‑1908968 | [UL CA]discussion on Tx requirement for NR intra-band CA in 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1908969 | [UL CA]Draft CR for 38.101-1 adding Output RF spectrum emissions for CA | Huawei, HiSilicon | imported from 3GU |
R4‑1908970 | [V2X] Discussion on MPR simulation assumption for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1908971 | [V2X] NR V2X coexistence simulation results for ITS spectrum case1 and case3 | Huawei, HiSilicon | imported from 3GU |
R4‑1908972 | [V2X] NR V2X coexistence simulation results for ITS spectrum case2 and case4 | Huawei, HiSilicon | imported from 3GU |
R4‑1908973 | [V2X] TP on PRR performance metrics for NR V2X coexistence simulation | Huawei, HiSilicon | imported from 3GU |
R4‑1908974 | [V2X] link level simulation assumption on sidelink PSSCH for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1908975 | New WI proposal introduction of 1900MHz SUL TDD band for NR | Huawei, HiSilicon | imported from 3GU |
R4‑1908976 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908977 | Draft CR to include 2BDL_4A-4A-5B_2BUL_4A-5A_BCS0 and 2BDL_2A-5B_2BUL_2A-5A_BCS0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908978 | TP for TR 37.716-21-11 Introduction of DC_2A-5A_n66A_BCS0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908979 | TP for TR 37.716-21-11 Introduction of DC_2A-66A-n66A_BCS0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908980 | TP for TR 37.716-21-11 Introduction of DC_5A-66A-n5A_BCS0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908981 | TP for TR 37.716-21-11 Introduction of DC_5A-66A_n66A_BCS0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908982 | TP for TR 37.716-21-11 Introduction of DC_13A-66A-n66A_BCS0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908983 | Discussion on applicability for CA demodulation requirements | CMCC | imported from 3GU |
R4‑1908984 | Discussion on applicability for CA demodulation requirements | CMCC | imported from 3GU |
R4‑1908985 | Channel arrangement for single wideband carrier operation | Samsung | imported from 3GU |
R4‑1908986 | Discussion and simulation results for BS performance with HST in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1908987 | CR to TR 37.843: Addition of 2D Compact Range. MU, calibration and test procedure for EIRP and EIS. | ROHDE & SCHWARZ | imported from 3GU |
R4‑1908988 | CR to TS 37.145-1 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908989 | CR to TS 37.145-1 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908990 | CR to TS 37.145-2 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908991 | CR to TS 37.145-2 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908992 | CR to TS 37.141 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908993 | CR to TS 37.141 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908994 | CR to TS 37.145-2 editoral corrections on removal of reference to 38.141-2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908995 | CR to TS 37.145-2 editoral corrections on removal of reference to 38.141-2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908996 | CR to TS 37.145-1 with editorial corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908997 | CR to TS 37.145-1 with editorial corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908998 | CR to TR 38.817-02 with correction of term ‘reference signal” for EVM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1908999 | Draft CR to TS 38.141-1 with clarification for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909000 | Draft CR to TS 38.141-2 with clarification for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909001 | Draft CR to TS 38.104 correction to Annex C.7 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909002 | Discussion on 256QAM for FR2 system level simulation assumptions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909003 | Channel raster for 5GHz NR-U band n46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909004 | Synchronization raster for 5GHz NR-U band n46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909005 | Increasing of spectrum utilization for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909006 | On BS RF requirements for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909007 | Discussion on 6 GHz NR-U band details | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909008 | Channelization for NR-U in band n46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909009 | Draft CR to add simultaneous RX/TX capability requirements in R16 TS 38.101-3 | CMCC | imported from 3GU |
R4‑1909010 | Discussion on the RRM impact from group WUS | Huawei, HiSilicon | imported from 3GU |
R4‑1909011 | Discussion on the preconfigured UL resource | Huawei, HiSilicon | imported from 3GU |
R4‑1909012 | Discussion on the multi carrier operations for NB R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909013 | Way forward on RRM impact of the R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1909014 | reply LS on DL channel quality report for configured carrier in RRC connected mode | Huawei, HiSilicon | imported from 3GU |
R4‑1909015 | CR on Cat NB2 UE test cases applicability R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909016 | CR on Cat NB2 UE test cases applicability R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909017 | maintenance CR on synchronized TDD NB test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909018 | maintenance CR on synchronized TDD NB test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909019 | CR on NB1 timing test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909020 | CR on NB1 timing test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909021 | Msg3 based reporting clarifications R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1909022 | Msg3 based reporting clarifications R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909023 | Msg3 based reporting clarifications R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909024 | CR on NR-U scenario B spec structure in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1909025 | Way forward on handling CRs for NR-U RRM specification | Huawei, HiSilicon | imported from 3GU |
R4‑1909026 | Discussion on the OTA alignment for IAB | Huawei, HiSilicon | imported from 3GU |
R4‑1909027 | Reply LS on OTA timing alignment for IAB | Huawei, HiSilicon | imported from 3GU |
R4‑1909028 | Reply LS on reporting criteria limitation in MR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1909029 | CR on event triggering and reporting criteria for 36133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909030 | CR on event triggering and reporting criteria for 36133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909031 | draftCR on BWP switch delay (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909032 | CR on interruptions due to RRC based BWP switch for EN-DC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909033 | CR on interruptions due to RRC based BWP switch for EN-DC R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909034 | CR on BWP switch interruptions for NE-DC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909035 | CR on BWP switch interruptions for NE-DC R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909036 | Work plan for R16 BWP switch RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1909037 | Discussion on the TCI state assumption after BWP switch | Huawei, HiSilicon | imported from 3GU |
R4‑1909038 | WF on R16 BWP switch RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1909039 | draftCR on TCI state assumption after BWP switch (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909040 | Maintenance on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909041 | Maintenance on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909042 | Maintenance on the BWP switch test cases SA FR1 (section A.6.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909043 | Maintenance on the BWP switch test cases SA FR2 (section A.7.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909044 | Correction on PRACH test configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1909045 | Correction on requiremnts applicability for inter-RAT NR measurements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909046 | Correction on requiremnts applicability for inter-RAT NR measurements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909047 | Correction on requiremnts applicability for intra-NR measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1909048 | Maintaince CR for inter-RAT handover TCs | Huawei, HiSilicon | imported from 3GU |
R4‑1909049 | Maintaince CR for interruptions at transitions between active and non-active during DRX in asynchronous EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1909050 | Maintaince CR for interruptions during measurements on deactivated E-UTRAN SCC | Huawei, HiSilicon | imported from 3GU |
R4‑1909051 | Maintaince CR for interruptions during measurements on deactivated NR SCC | Huawei, HiSilicon | imported from 3GU |
R4‑1909052 | Maintaince CR for RRC redirection TCs | Huawei, HiSilicon | imported from 3GU |
R4‑1909053 | Maintaince CR for RRC re-establishment TCs | Huawei, HiSilicon | imported from 3GU |
R4‑1909054 | Maintaince CR for SCell activation delay TCs | Huawei, HiSilicon | imported from 3GU |
R4‑1909055 | Editorial CR on idle state mobility (section 4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909056 | Work plan for demodulation part of NR support for high speed train scenario | CMCC | imported from 3GU |
R4‑1909057 | draft CR for editorial correction on UE coexistence for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909058 | MSD on asyncronous operation for n78-n79 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909059 | OBB exception for n28_n78 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909060 | Effective use of power of PC2 UE with two different UL bands | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909061 | Effective use of the remaining power of High Power UE | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909062 | Handling of EN-DC BCS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909063 | Handling configurations including DC_42_n78 or DC_42_n77 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909064 | draft CR for handling configurations including DC_42_n78 or DC_42_n77 for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909065 | draft CR for editorial correction EN-DC of LTE 4bands + NR 1 band for Rel-15 TS 38.101-3.docx | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909066 | draft CR for EN-DC of LTE 1band + NR 1 band for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909067 | draft CR for EN-DC of LTE 2bands + NR 1 band for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909068 | draft CR for EN-DC of LTE 3bands + NR 1 band for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909069 | Updated TR 37.716-11-11_V0.6.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909070 | Revised WID for EN-DC of LTE 1band + NR 1band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909071 | Big CR for EN-DC of LTE 1band + NR 1band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909072 | Editorial CR on section 9.1.4 | OPPO | imported from 3GU |
R4‑1909073 | Discussion on SCell Activation Delay Requirement | OPPO | imported from 3GU |
R4‑1909074 | Further discussion on SS raster for NR-U | OPPO | imported from 3GU |
R4‑1909075 | Discussion on RLM for NR-U | OPPO | imported from 3GU |
R4‑1909076 | Discussion on UE measurement capability and reporting criteria for NR-U | OPPO | imported from 3GU |
R4‑1909077 | Discussion on general requirement for MIMO layer adaption | OPPO | imported from 3GU |
R4‑1909078 | Discussion on switching and interruption requirement for MIMO layer adaption | OPPO | imported from 3GU |
R4‑1909079 | Draft CR on TS38.133 for Psharing factor for RLM (section 8.1.2) | CMCC | imported from 3GU |
R4‑1909080 | About NSA FDD-TDD HPUE SAR | OPPO | imported from 3GU |
R4‑1909081 | About NSA HPUE release independent issue | OPPO | imported from 3GU |
R4‑1909082 | About MPE enhancements | OPPO | imported from 3GU |
R4‑1909083 | About MIMO OTA SI speed up | OPPO, CAICT | imported from 3GU |
R4‑1909084 | TP to TR 38.827 v1.0.1 on environmental requirements | OPPO | imported from 3GU |
R4‑1909085 | About MIMO OTA environmental condition in FR1 | OPPO | imported from 3GU |
R4‑1909086 | TP to TR 38.827 v1.0.1 on averaging of throughput curves | OPPO | imported from 3GU |
R4‑1909087 | About MIMO OTA system layouts | OPPO | imported from 3GU |
R4‑1909088 | TP to TR 38.827 v1.0.1 on test zone size | OPPO | imported from 3GU |
R4‑1909089 | About MIMO OTA FR2 UE positions | OPPO | imported from 3GU |
R4‑1909090 | TR skeleton for TR 38.8xx: Study on support of NR downlink 256 Quadrature Amplitude Modulation (QAM) for frequency range 2 (FR2) | China Telecom | imported from 3GU |
R4‑1909091 | Link level simulation results for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1909092 | TP for TR 38.8xx: Simulation assumptions for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1909093 | TP for TR 38.8xx: Link level simulation results for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1909094 | TP for TR 38.8xx: System level simulation results for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1909095 | TP to TR 38.820: UE RF technology considerations in the 7-24 GHz range | LG Electronics Finland, Skyworks Solutions Inc. | imported from 3GU |
R4‑1909096 | Draft CR for 38.101-1 power class and configure transmitted power | Huawei, HiSilicon | imported from 3GU |
R4‑1909097 | On transient period UE capability | Huawei, HiSilicon | imported from 3GU |
R4‑1909098 | On switching time for MIMO layer/antenna number adaption | Huawei, HiSilicon | imported from 3GU |
R4‑1909099 | Draft CR for 38.101-3 Pcmax for EN-DC with 3CC uplink | Huawei, HiSilicon | imported from 3GU |
R4‑1909100 | On RSRPB and RSARP | Huawei, HiSilicon | imported from 3GU |
R4‑1909101 | Reply LS on bandwidth of initial BWP | Huawei, HiSilicon | imported from 3GU |
R4‑1909102 | On the bandwidth of initial BWP | Huawei, HiSilicon | imported from 3GU |
R4‑1909103 | On power class and configured transmit power | Huawei, HiSilicon | imported from 3GU |
R4‑1909104 | on FR2 Pmax and cell selection | Huawei, HiSilicon | imported from 3GU |
R4‑1909105 | On beam correspondence side condition | Huawei, HiSilicon | imported from 3GU |
R4‑1909106 | On ACLR test metric | Huawei, HiSilicon | imported from 3GU |
R4‑1909107 | Draft CR for 38.101-3 non-contiguous resource allocation | Huawei, HiSilicon | imported from 3GU |
R4‑1909108 | Draft CR for 38.101-3 EN-DC Pcmax clear | Huawei, HiSilicon | imported from 3GU |
R4‑1909109 | Draft CR for 38.101-3 EN-DC MPR and AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1909110 | Draft CR for 38.101-3 correction for EN-DC NBB | Huawei, HiSilicon | imported from 3GU |
R4‑1909111 | Draft CR for 38.101-3 applicability for intra-band CA and ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1909112 | Draft CR for 38.101-2 EVM and Uplink reference measurement channel | Huawei, HiSilicon | imported from 3GU |
R4‑1909113 | Draft CR for 38.101-2 Maximum input level | Huawei, HiSilicon | imported from 3GU |
R4‑1909114 | Draft CR for 38.101-2 draft CR on side condition for BC | Huawei, HiSilicon | imported from 3GU |
R4‑1909115 | Draft CR for 38.101-2 reference measurement channel for beam correspondence | Huawei, HiSilicon | imported from 3GU |
R4‑1909116 | Draft CR for 38.101-2 correction for channel raster | Huawei, HiSilicon | imported from 3GU |
R4‑1909117 | Draft CR for 38.101-2 applicability for intra-band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1909118 | Draft CR for 38.101-2 ACLR test metric | Huawei, HiSilicon | imported from 3GU |
R4‑1909119 | Draft CR for 38.101-1 Pcmax for inter band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1909120 | Draft CR for 38.101-1 modified MPR and AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1909121 | Draft CR for 38.101-1 correction for intra-band CA NBB | Huawei, HiSilicon | imported from 3GU |
R4‑1909122 | Draft CR for 38.101-1 applicability for intra-band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1909123 | Draft CR for 38.101-1 correction for channel raster | Huawei, HiSilicon | imported from 3GU |
R4‑1909124 | Introduction of completed R16 3DL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1909125 | CR for 36.101 Pcmax for V2X_v16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909126 | CR for 36.101 Pcmax for V2X _v15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909127 | CR for 36.101 Pcmax for V2X_v14 | Huawei, HiSilicon | imported from 3GU |
R4‑1909128 | CR for 36.101 UE-to-UE coexistence for V2X_v16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909129 | CR for 36.101 UE-to-UE coexistence for V2X _v15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909130 | CR for 36.101 UE-to-UE coexistence for V2X_v14 | Huawei, HiSilicon | imported from 3GU |
R4‑1909131 | Workplan for ENDC with 3CC uplink | Huawei, HiSilicon | imported from 3GU |
R4‑1909132 | On relation between power class and UE type for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909133 | on Pcmax for ENDC with 3CC uplink | Huawei, HiSilicon | imported from 3GU |
R4‑1909134 | On intra-band UL non-contiguous CA requirement for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909135 | TP for TR 38.820: scope of NR UE RF | Huawei, HiSilicon | imported from 3GU |
R4‑1909136 | TP for TR 38.820: UE RF Tx requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1909137 | TP for TR 38.820: UE RF Rx requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1909138 | TP for TR 38.820: general part for UE RF | Huawei, HiSilicon | imported from 3GU |
R4‑1909139 | general part for 7-24GHz UE RF requiremen | Huawei, HiSilicon | imported from 3GU |
R4‑1909140 | Revised WID for LTE inter-band CA for 3 bands DL with 1 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1909141 | Maintenance CR on RLM scheduling restriction EN-DC (section A.5.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1909142 | Maintenance CR on RLM scheduling restriction NR SA (section A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1909143 | TR 36.716-03-01 | Huawei, HiSilicon | imported from 3GU |
R4‑1909144 | Clarification of Rmax for NB-IoT MSG3-based channel quality report | Ericsson | imported from 3GU |
R4‑1909145 | Clarification of Rmax for NB-IoT MSG3-based channel quality report | Ericsson | imported from 3GU |
R4‑1909146 | Clarification of Rmax for NB-IoT MSG3-based channel quality report | Ericsson | imported from 3GU |
R4‑1909147 | Clean up of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1909148 | Clean up of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1909149 | Clean up of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1909150 | Clean up of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1909151 | Discussion on NB-IoT NPRACH demodulation performance for TDD | Ericsson | imported from 3GU |
R4‑1909152 | Measurement period for DL channel quality reporting for NB-IoT | Ericsson | imported from 3GU |
R4‑1909153 | LS response DL channel quality report for configured carrier in RRC connected mode | Ericsson | imported from 3GU |
R4‑1909154 | Discussion on quality report contents in connected mode | Ericsson | imported from 3GU |
R4‑1909155 | Discussion on channel quality reporting for eMTC | Ericsson | imported from 3GU |
R4‑1909156 | RLM with MPDCCH improvement | Ericsson | imported from 3GU |
R4‑1909157 | RLM for HST | Ericsson | imported from 3GU |
R4‑1909158 | Beam management in NR-U | Ericsson | imported from 3GU |
R4‑1909159 | L1-RSRP measurements in NR-U | Ericsson | imported from 3GU |
R4‑1909160 | Editorial correction on test configuration (Annex A.1-A.3) | Ericsson | imported from 3GU |
R4‑1909161 | CSI-RS periodicity for contention free random access tests | Ericsson | imported from 3GU |
R4‑1909162 | Correction of CSI-RS configurations used for NR RRM tests | Ericsson | imported from 3GU |
R4‑1909163 | NR UE demodulation requirements specification editorial work | Ericsson | imported from 3GU |
R4‑1909164 | Correction of parameters for aperiodic CSI reporting tests | Ericsson | imported from 3GU |
R4‑1909165 | Discussion on UE demodulation requirements for CA, EN-DC, and NE-DC | Ericsson | imported from 3GU |
R4‑1909166 | Discussion on UE demodulation requirements for NR-DC | Ericsson | imported from 3GU |
R4‑1909167 | Way forward on NR PDSCH demodulation requirements for CA, EN-DC, NE-DC, and NR-DC | Ericsson | imported from 3GU |
R4‑1909168 | Discussion on UE demodulation requirements for LTE-NR co-existence scenario in TDD | Ericsson | imported from 3GU |
R4‑1909169 | Simulation assumption of UE demodulation requirements for LTE-NR co-existence scenario in TDD | Ericsson | imported from 3GU |
R4‑1909170 | UE/BS demodulation requirements for low latency | Ericsson | imported from 3GU |
R4‑1909171 | View on HST scenario for Rel-16 UE demodulation requirements | Ericsson | imported from 3GU |
R4‑1909172 | Views on the UE orientation and number of test points in FR2 MIMO OTA test | Sony, MVG Industries | imported from 3GU |
R4‑1909173 | TP on system scenarios for NB-IoT co-existence with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1909174 | Clarification on NB-IoT operation modes | Huawei, HiSilicon | imported from 3GU |
R4‑1909175 | TP on NB-IoT operating in NR guard band | Huawei, HiSilicon | imported from 3GU |
R4‑1909176 | Further consideration on power boosting | Huawei, HiSilicon | imported from 3GU |
R4‑1909177 | TP on specification and conformance impact | Huawei, HiSilicon | imported from 3GU |
R4‑1909178 | CR to TR 38.817-02 updating the FR2 TAE limits | Huawei, HiSilicon | imported from 3GU |
R4‑1909179 | Draft CR for TS 38.104: Channel spacing for adjacent NR carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1909180 | CR for TS 38.104: adding wider channel bandwidths in Band n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1909181 | A-MPR table for n38 40 MHz co-existence | Huawei, HiSilicon | imported from 3GU |
R4‑1909182 | Applicability of requirements and test configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1909183 | Options on MSR new capability sets | Huawei, HiSilicon | imported from 3GU |
R4‑1909184 | Test configuration for new MSR CS | Huawei, HiSilicon | imported from 3GU |
R4‑1909185 | Phase noise on 256QAM support for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909186 | Simulation results on DL 256QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1909187 | TP for TR 37.716-31-11: DC_2-7-66_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1909188 | TP for TR 37.716-31-11: DC_2-7-13_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909189 | TP for TR 37.716-11-11: DC_7_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909190 | TP for TR 37.716-11-11: DC_13_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909191 | TP for TR 37.716-11-11: DC_7A-7A_N5a | Huawei, HiSilicon | imported from 3GU |
R4‑1909192 | TP for TR 37.716-11-11: DC_2_n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1909193 | TP for TR 37.716-11-11: DC_5_n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1909194 | TP for TR 37.716-21-11: DC_2-7_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909195 | TP for TR 37.716-21-11: DC_2-13_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909196 | TP for TR 37.716-21-11: DC_7-13_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909197 | TP for TR 38.716-02-00: CA_n66-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1909198 | TP for TR 38.716-02-00: CA_n7-n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1909199 | Channel arrangement for NR-U band n46 | Huawei, HiSilicon | imported from 3GU |
R4‑1909200 | Spectrum utilization improvement in unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R4‑1909201 | Synchronization raster for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1909202 | Further discussion on wideband operation at UE for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1909203 | Further discussion on wideband operation at BS for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1909204 | NR-U BS ACLR requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909205 | NR-U UE power class | Huawei, HiSilicon | imported from 3GU |
R4‑1909206 | Discussion on adding wider channel bandwidths in Band n77/n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1909207 | CR for TS 38.101-1: adding wider channel bandwidths | Huawei, HiSilicon | imported from 3GU |
R4‑1909208 | LS to RAN2 on adding 70MHz UE CBW in Band n77/n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1909209 | CR for TS 38.104: adding wider channel bandwidths in Band n77/n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1909210 | New WID on addition of asymmetric channel bandwidth for n66 | TELUS, Huawei, HiSilicon | imported from 3GU |
R4‑1909211 | Discussion on HST perf requirement for NR PRACH | Huawei, Hisilicon | imported from 3GU |
R4‑1909212 | Simulation results for NR FR1 PUCCH demod perf | Huawei, Hisilicon | imported from 3GU |
R4‑1909213 | Simulation results for NR FR2 PUCCH demod perf | Huawei, Hisilicon | imported from 3GU |
R4‑1909214 | Simulation results for NR PUCCH multi-slot perf | Huawei, Hisilicon | imported from 3GU |
R4‑1909215 | Draft CR on updates to FR1 CSI reporting test | Huawei, Hisilicon | imported from 3GU |
R4‑1909216 | Draft CR on updates to FR2 CSI reporting test | Huawei, Hisilicon | imported from 3GU |
R4‑1909217 | Discussion on requirements for the number of TX ports larger than 8 and up to 32 | Huawei, Hisilicon | imported from 3GU |
R4‑1909218 | Views on the UE antenna architecture and deployment scenario in 7 – 24 GHz frequency range | Sony, Ericsson | imported from 3GU |
R4‑1909219 | Beam Correspondence, SNR versus RSRP | Sony, Ericsson | imported from 3GU |
R4‑1909220 | RSSI and Channel Occupancy Measurements in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909221 | On SCell Activation and Deactivation Delays in NR-U Scenario A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909222 | Discussion on NR-U terminology in TS 38.133 and TS 36.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909223 | On Active BWP switch delay in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909224 | Cell re-selection in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909225 | Beam Correspondence in poor SNR conditions | Sony | imported from 3GU |
R4‑1909226 | TR 37.716-21-11 v0.6.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1909227 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1909228 | CR on introduction of completed EN-DC of 2 bands LTE and 1 band NR from RAN4#92 into TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1909229 | Draft CR to TS 36.101: Correction of CA_2-7-66 | Huawei, HiSilicon, TELUS | imported from 3GU |
R4‑1909230 | n29 introduction to 38.104 | Dish Network | imported from 3GU |
R4‑1909231 | n29 introduction to 37.104 | Dish Network | imported from 3GU |
R4‑1909232 | n29 introduction to 37.105 | Dish Network | imported from 3GU |
R4‑1909233 | n29 introduction to 38.133 | Dish Network | imported from 3GU |
R4‑1909234 | n29 introduction to 36.104 | Dish Network | imported from 3GU |
R4‑1909235 | n29 introduction to 36.141 | Dish Network | imported from 3GU |
R4‑1909236 | n29 introduction to 37.141 | Dish Network | imported from 3GU |
R4‑1909237 | n29 introduction to 37.145-1 | Dish Network | imported from 3GU |
R4‑1909238 | n29 introduction to 37.145-2 | Dish Network | imported from 3GU |
R4‑1909239 | n29 introduction to 38.141-1 | Dish Network | imported from 3GU |
R4‑1909240 | n29 introduction to 38.141-2 | Dish Network | imported from 3GU |
R4‑1909241 | Correction to Band n66 | Dish Network | imported from 3GU |
R4‑1909242 | Simulation assumptions for CSI requirements for the number of TX ports larger than 8 and up to 32 | Ericsson | imported from 3GU |
R4‑1909243 | CSI requirements for the number of TX ports larger than 8 and up to 32 | Ericsson | imported from 3GU |
R4‑1909244 | Summary of simulation results of NR UE demod (FR1 FDD) | Ericsson | imported from 3GU |
R4‑1909245 | Summary of simulation results of NR UE demod (FR1 TDD) | Ericsson | imported from 3GU |
R4‑1909246 | Updated PDSCH HST results for Rel-15 | Ericsson | imported from 3GU |
R4‑1909247 | Simulation assumptions for NR Rel-16 HST UE PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1909248 | Simulation assumptions for NR Rel-16 HST PDSCH UE demodulation requirements | Ericsson | imported from 3GU |
R4‑1909249 | General overview of URLLC feature | Ericsson | imported from 3GU |
R4‑1909250 | Editorial change to correct TDD measurement channels | Ericsson | imported from 3GU |
R4‑1909251 | Editorial correction to formatting on SDR table | Ericsson | imported from 3GU |
R4‑1909252 | Editorial correction to PBCH requirements | Ericsson | imported from 3GU |
R4‑1909253 | Editorial correction to PDSCH reference channels | Ericsson | imported from 3GU |
R4‑1909254 | draft CR to introduce new combinations of LTE 4band + NR 1band for TS 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909255 | TP for TR 38.716-02-00 CA_n41-n66 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1909256 | TP for TR 38.716-02-00 CA_n41-n261 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1909257 | TP for TR 37.716-11-11 DC_48_n261 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1909258 | TP for TR 37.716-21-11 DC_46-48_n261 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1909259 | NR-U - PRB grid and placement of guardbands | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909260 | NR-U - Discussion on spectral emission mask | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909261 | draftTR 37.716-41-11 v0.4.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909262 | Revised WID on Dual Connectivity (EN-DC) of 4 bands LTE inter-band CA (4DL/1UL) and 1 NR band (1DL/1UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909263 | Draft reply LS on NR V2X UE RF parameters for NR V2X service PSFCH | LG Electronics Finland | imported from 3GU |
R4‑1909264 | Draft CR to TS 38.101-1 on maximum output power reduction for PC3 | ZTE corporation | imported from 3GU |
R4‑1909265 | Correspondence between different UE alignment options and orientations in the UE reference coordinate system | EMITE | imported from 3GU |
R4‑1909266 | Draft CR to TS 38.101-2 on NR CA configurations for FR2 | ZTE Corporation | imported from 3GU |
R4‑1909267 | TP to TR 38.820: Signal quality considerations for 7-24 GHz base station operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909268 | Base station RF architectures and requirements for 7 – 24 GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909269 | Initial FR2 DL 256QAM link level simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909270 | Draft CR to TS 38.104: Receiver spurious emissions frequency correction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909271 | Frequency error considerations for IAB-Node | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909272 | Initial IAB-Node coexistence simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909273 | Requirements for new NR FDD bands with variable duplex | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909274 | DraftCR on SSB-based RLM test cases for EN-DC FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1909275 | DraftCR on SSB-based RLM test cases for EN-DC FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909276 | DraftCR on SSB-based RLM test cases for NR standalone FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1909277 | DraftCR on SSB-based RLM test cases for NR standalone FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909278 | DraftCR on Reference DRX configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1909279 | TR 38.820, v0.1.0: implementation of TPs from RAN4#91 | Huawei | imported from 3GU |
R4‑1909280 | TR 38.820, v0.2.0: implementation of TPs from RAN4#92 | Huawei | imported from 3GU |
R4‑1909281 | Status update on the 7 - 24 GHz SI work progress and timeline | Huawei | imported from 3GU |
R4‑1909282 | TP to TR 38.820: Updates on the PA trends | Huawei | imported from 3GU |
R4‑1909283 | Updates on CEPT ECC PT A decisions on WRC-2023 agenda for IMT in 7-24 GHz | Huawei | imported from 3GU |
R4‑1909284 | ATU report on the IMT in 7-24 GHz for WRC-2023 agenda | Huawei | imported from 3GU |
R4‑1909285 | Updated list of frequency bands of interest within 7-24 GHz range | Huawei | imported from 3GU |
R4‑1909286 | On regional preparations for WRC-19 | Huawei | imported from 3GU |
R4‑1909287 | TP to TR 38.820: timeline of the regulatory work in ITU-R | Huawei | imported from 3GU |
R4‑1909288 | Further analysis of applications in 7 - 24 GHz range: spectrum management techniques | Huawei | imported from 3GU |
R4‑1909289 | Analysis of the aggregated system bandwidth for 7 – 24 GHz | Huawei | imported from 3GU |
R4‑1909290 | TP to TR 38.820: aggregated system bandwidth for 7 – 24 GHz | Huawei | imported from 3GU |
R4‑1909291 | Analysis of the non-terrestrial networks (NTN) work in 3GPP | Huawei | imported from 3GU |
R4‑1909292 | Further analysis of the deployment scenarios for 7-24 GHz frequency range | Huawei | imported from 3GU |
R4‑1909293 | TP to TR 38.820: placeholder for the BS RF requirements summary | Huawei | imported from 3GU |
R4‑1909294 | On manufacturer declarations for NR BS testing | Huawei | imported from 3GU |
R4‑1909295 | CR to TS 36.113: correction of Rx exclusion band into equation-based approach, Rel 15 | Huawei | imported from 3GU |
R4‑1909296 | CR to TS 36.113: correction of Rx exclusion band into equation-based approach, Rel 16 | Huawei | imported from 3GU |
R4‑1909297 | CR to 37.105: correction of TAB connectors mapping to TAB connector TX min cell group, Rel-13 | Huawei | imported from 3GU |
R4‑1909298 | CR to 37.105: correction of TAB connectors mapping to TAB connector TX min cell group, Rel-14 | Huawei | imported from 3GU |
R4‑1909299 | CR to 37.105: correction of TAB connectors mapping to TAB connector TX min cell group, Rel-15 | Huawei | imported from 3GU |
R4‑1909300 | CR to 37.105: correction of TAB connectors mapping to TAB connector TX min cell group, Rel-16 | Huawei | imported from 3GU |
R4‑1909301 | CR to 37.145-1: correction of equivalent TAB connectors testing, Rel-13 | Huawei | imported from 3GU |
R4‑1909302 | CR to 37.145-1: correction of equivalent TAB connectors testing, Rel-14 | Huawei | imported from 3GU |
R4‑1909303 | CR to 37.145-1: correction of equivalent TAB connectors testing, Rel-15 | Huawei | imported from 3GU |
R4‑1909304 | CR to 37.145-1: correction of equivalent TAB connectors testing, Rel-16 | Huawei | imported from 3GU |
R4‑1909305 | CR to 37.145-2: correction of equivalent beams testing, Rel-13 | Huawei | imported from 3GU |
R4‑1909306 | CR to 37.145-2: correction of equivalent beams testing, Rel-14 | Huawei | imported from 3GU |
R4‑1909307 | CR to 37.145-2: correction of equivalent beams testing, Rel-15 | Huawei | imported from 3GU |
R4‑1909308 | CR to 37.145-2: correction of equivalent beams testing, Rel-16 | Huawei | imported from 3GU |
R4‑1909309 | DraftCR to TS 38.104: text corrections, Rel-15 | Huawei | imported from 3GU |
R4‑1909310 | DraftCR to 38.104: correction of TAB connectors mapping to TAB connector TX min cell group, Rel-15 | Huawei | imported from 3GU |
R4‑1909311 | DraftCR to TS 38.141-1: reference corrections, Rel-15 | Huawei | imported from 3GU |
R4‑1909312 | DraftCR to 38.141-1: correction of equivalent TAB connectors testing, Rel-15 | Huawei | imported from 3GU |
R4‑1909313 | DraftCR to TS 38.141-2: reference corrections, Rel-15 | Huawei | imported from 3GU |
R4‑1909314 | Discussion on the references to internal TRs | Huawei | imported from 3GU |
R4‑1909315 | DraftCR to 38.141-2: correction of equivalent beams testing, Rel-15 | Huawei | imported from 3GU |
R4‑1909316 | Draft CR to TS 38.101-2 on symbols correction | ZTE Corporation | imported from 3GU |
R4‑1909317 | CR on applicability of GP with short MGL in 38.133 (section 9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909318 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909319 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909320 | CR on default gap sharing scheme in 38.133 (section 9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909321 | CR on default gap sharing scheme in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909322 | CR on default gap sharing scheme in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909323 | CR on handover requirements in 38.133 (section 6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909324 | CR on handover requirements in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909325 | CR on handover requirements in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909326 | Discussion on the requirements for PSCell change in ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1909327 | Requirements for PSCell change in ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1909328 | CR on PSCell addition in ENDC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909329 | CR on PSCell addition in ENDC R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909330 | CR on known TCI state definition (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1909331 | Scheduling restriction on TCI state switching delay (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1909332 | Clarification on the applicability of TCI state switching | Huawei, HiSilicon | imported from 3GU |
R4‑1909333 | CR on scheduling restricion due to CORESET and RMSI pattern 2/3 in intra-f measurement and L1-RSRP | Huawei, HiSilicon | imported from 3GU |
R4‑1909334 | CR on Scheduling availability on RLM due to CORESET and RMSI multiplexing pattern 2/3 (section 8.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909335 | CR on scheduling availability of BFD due to CORESET and RMSI multiplexing pattern 2/3 (section 8.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1909336 | CR on scheduling availability on CBD due to CORESET and RMSI multiplexing pattern 2/3 (section 8.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1909337 | Correction on the inta-band interruption (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909338 | Adding the interrupions due to DRX for NR-DC (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909339 | Interruption during measurement on SCC for inter-band CA (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909340 | Discussion on RRM impact on SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1909341 | Measurement capability for NR- UMTS for SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1909342 | Draft LS Reply on measurements for SRVCC from 5G to 3G | Huawei, HiSilicon | imported from 3GU |
R4‑1909343 | Corrction on SUL test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1909344 | Editorial CR on interruption (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909345 | Editorial CR on UE UL carrier RRC reconfiguration delay (section 8.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909346 | Further discussion on measurement requirements on LTE high speed in Rel.16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909347 | CR on idle mode requirements in HST scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1909348 | CR on Pcell measurement enhancement requirements in HST scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1909349 | CR on Scell measurement enhancement requirements in HST scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1909350 | CR on timing requriement in HST scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1909351 | Discussion on handover delay for conditional handover in feMobility | Huawei, HiSilicon | imported from 3GU |
R4‑1909352 | Discussion on RRM requirements for eMBB in feMobility | Huawei, HiSilicon | imported from 3GU |
R4‑1909353 | WF on Rel-16 feMobility RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1909354 | Draft CR to TS 38.101-3 on UE additional maximum output power reduction for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1909355 | Mandatory 90 MHz UE Channel BW for n78 | Vodafone, Deutsche Telekom | imported from 3GU |
R4‑1909356 | TP for TR 37.716-41-11: DC_1A-3A-7A-8A_n78A | Vodafone España SA | imported from 3GU |
R4‑1909357 | Draft CR to TS 38.101-3 on UE maximum output power for DC | ZTE Corporation | imported from 3GU |
R4‑1909358 | Draft CR to TS 38.101-3: Adding DC_3C-7A-20A_n78A | Vodafone España SA | imported from 3GU |
R4‑1909359 | Clarification on intra-band non-contiguous EN-DC notation | ZTE Corporation | imported from 3GU |
R4‑1909360 | TP to TR38.820: system parameters | ZTE Corporation | imported from 3GU |
R4‑1909361 | Correction of references to RSRP performance requirements for CE Mode B | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909362 | Correction to SNR definition for NPRACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909363 | Simulation results for NPRACH TDD demodulation performance alignment | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909364 | Simulation results for RSS based RSRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909365 | Scope of RRM requirements for NR positioning | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909366 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909367 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909368 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1909369 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1909370 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909371 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909372 | CR of adding LTE B42/B43 for UE CAT_M1 in R16 | Ericsson | imported from 3GU |
R4‑1909373 | CR of adding LTE B42/B43 for UE CAT_M1 in R16 | Ericsson | imported from 3GU |
R4‑1909374 | CR of adding LTE B42/B43 for UE CAT_M1 in R16 | Ericsson | imported from 3GU |
R4‑1909375 | CR of adding LTE B42/B43 for UE CAT_M2 in R16 | Ericsson | imported from 3GU |
R4‑1909376 | CR of adding LTE B42/B43 for UE CAT_M2 in R16 | Ericsson | imported from 3GU |
R4‑1909377 | CR of adding LTE B42/B43 for UE category NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909378 | CR of adding LTE B7 for UE category NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909379 | CR of adding LTE B7 for UE category NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909380 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909381 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909382 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909383 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909384 | CR of adding LTE B7 for NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909385 | CR of adding LTE B7 for NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909386 | CR of adding LTE B7 for NB1 in R16 | Ericsson | imported from 3GU |
R4‑1909387 | CR of adding LTE B7 for NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909388 | CR of adding LTE B7 for NB2 in R16 | Ericsson | imported from 3GU |
R4‑1909389 | coexistence simulation results for IAB network | Ericsson | imported from 3GU |
R4‑1909390 | RF impact analysis on the SDM/FDM operation for IAB node | Ericsson | imported from 3GU |
R4‑1909391 | On EIRP/EIS related requirement of IAB node | Ericsson | imported from 3GU |
R4‑1909392 | channel raster design of Rel-16 NR-U for 5GHz band | Ericsson | imported from 3GU |
R4‑1909393 | SSB raster design of Rel-16 NR-U for 5GHz band | Ericsson | imported from 3GU |
R4‑1909394 | SSB raster position placement discussion | Ericsson | imported from 3GU |
R4‑1909395 | WF on SSB raster and channel raster | Ericsson | imported from 3GU |
R4‑1909396 | LS to RAN1 regarding the SSB raster on channel edge | Ericsson | imported from 3GU |
R4‑1909397 | TP for TR 37.832: Testability applicability | Ericsson | imported from 3GU |
R4‑1909398 | TP for Simultaneously operation with LTE_MTC and NR | Ericsson | imported from 3GU |
R4‑1909399 | draft TR 37.823 LTE-M coexisting with NR v 0.1.0 | Ericsson | imported from 3GU |
R4‑1909400 | Draft CR to TS 38.101-3 for DC_38_n78 mandatory simultaneous Rx/Tx capability | Vodafone España SA | imported from 3GU |
R4‑1909401 | Initial Link Simulation Results on DL 256 QAM FR2 | Ericsson | imported from 3GU |
R4‑1909402 | Simulation Assumptions for 256 QAM FR2 Analysis | Ericsson | imported from 3GU |
R4‑1909403 | Feasibility of UE Demodulation Testing | Ericsson | imported from 3GU |
R4‑1909404 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909405 | TR 36.716-04-01 v0.5.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909406 | Updated scope of TR: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909407 | On applicability of requirements and test configurations for new capability sets | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909408 | On test configuration definitions for new capability sets | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909409 | Correction of NTC21 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909410 | Correction of NTC21 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909411 | Minor corrections of intra-band non-contiguous CA operating bands in TS 38.101-2 | vivo | imported from 3GU |
R4‑1909412 | Discuss TRP measurement procedures | Huawei | imported from 3GU |
R4‑1909413 | draft CR to TS 38.141-2 – clarify measurement directions test procedures | Huawei | imported from 3GU |
R4‑1909414 | CR to TS 37.145-2 – clarify measurement directions test procedures | Huawei | imported from 3GU |
R4‑1909415 | CR to TS 37.145-2 – clarify measurement directions test procedures | Huawei | imported from 3GU |
R4‑1909416 | draft CR 38.104 - correct reference to annex F | Huawei | imported from 3GU |
R4‑1909417 | draft CR to 38.817-02 - correct TX OFF MU table | Huawei | imported from 3GU |
R4‑1909418 | draft CR to 38.817-02 - derivation of FR2 out of band blocking limits | Huawei | imported from 3GU |
R4‑1909419 | draft CR to 38.141-2 - Improvements to annex I | Huawei | imported from 3GU |
R4‑1909420 | CR to TS 37.145-2 – Improvements to Annex F | Huawei | imported from 3GU |
R4‑1909421 | CR to TS 37.145-2 – Improvements to Annex F | Huawei | imported from 3GU |
R4‑1909422 | Discuss Reverb chamber inclusion in the TRP measurement procedures. | Huawei | imported from 3GU |
R4‑1909423 | CR to TS 37.145-2 – clean up reverberation chamber spurious emissions procedure | Huawei | imported from 3GU |
R4‑1909424 | CR to TS 37.145-2 – clean up reverberation chamber spurious emissions procedure | Huawei | imported from 3GU |
R4‑1909425 | draft CR to TS 38.141-2 – clean up reverberation chamber spurious emissions procedure | Huawei | imported from 3GU |
R4‑1909426 | CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1909427 | CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1909428 | draft CR to TS 38.141-2 – reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1909429 | Discuss the single polarisation test method | Huawei | imported from 3GU |
R4‑1909430 | CR to TS 37.145-2 – single polarisation measurement procedure | Huawei | imported from 3GU |
R4‑1909431 | CR to TS 37.145-2 – single polarisation measurement procedure | Huawei | imported from 3GU |
R4‑1909432 | Draft CR to TS 38.141-2 – single polarisation measurement procedure | Huawei | imported from 3GU |
R4‑1909433 | TP to TR - capture background on IAB antenna assumptions | Huawei | imported from 3GU |
R4‑1909434 | TP to TR - capture background on co-location scenarios | Huawei | imported from 3GU |
R4‑1909435 | CR to TR 38.828 - abbreviations clean up | Huawei | imported from 3GU |
R4‑1909436 | CR to TR 38.828 - references clean up | Huawei | imported from 3GU |
R4‑1909437 | Link budgets and cell size | Huawei | imported from 3GU |
R4‑1909438 | BS types and power limits | Huawei | imported from 3GU |
R4‑1909439 | TP to TR 38.820, FR1 and FR2 key differentiators | Huawei | imported from 3GU |
R4‑1909440 | Transmitter architectures and PA performance | Huawei | imported from 3GU |
R4‑1909441 | TP to TR 38.820, capture transmitter architecture discussion. | Huawei | imported from 3GU |
R4‑1909442 | LO phase noise example | Huawei | imported from 3GU |
R4‑1909443 | Discuss co-location requirements limitations and measurement at high frequencies | Huawei | imported from 3GU |
R4‑1909444 | TP to TR38.820 - co-location requirements | Huawei | imported from 3GU |
R4‑1909445 | Discuss co-existence requirements | Huawei | imported from 3GU |
R4‑1909446 | TP to TR38.820 - co-existence emissions requirements | Huawei | imported from 3GU |
R4‑1909447 | Out of band blocking requirements | Huawei | imported from 3GU |
R4‑1909448 | TP to TR38.820 -Out of band blocking requirements | Huawei | imported from 3GU |
R4‑1909449 | Updated results for timing acquisition for inter-RAT RSTD measurements | Ericsson | imported from 3GU |
R4‑1909450 | E-UTRAN time acquisition requirements for E-UTRA FDD RSTD measurements (section 9.4.4) | Ericsson | imported from 3GU |
R4‑1909451 | E-UTRAN time acquisition requirements for E-UTRA TDD RSTD measurements (section 9.4.4) | Ericsson | imported from 3GU |
R4‑1909452 | Updated split of the NR editorial work | Ericsson | imported from 3GU |
R4‑1909453 | Editorial updates (section 9.4) | Ericsson | imported from 3GU |
R4‑1909454 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1909455 | Editorial corrections in 36.133 | Ericsson | imported from 3GU |
R4‑1909456 | Editorial corrections in 36.133 | Ericsson | imported from 3GU |
R4‑1909457 | Response LS on Reporting criteria limitation in MR-DC | Ericsson | imported from 3GU |
R4‑1909458 | On reference point for UE timing related measurements | Ericsson | imported from 3GU |
R4‑1909459 | On reference point for base station timing related measurements | Ericsson | imported from 3GU |
R4‑1909460 | Response LS on Reference Point for Timing Related Measurements | Ericsson | imported from 3GU |
R4‑1909461 | Time plan and system-level assumptions for RSTD simulations in NR | Ericsson | imported from 3GU |
R4‑1909462 | Analysis of MR-DC enhancement agreements on early measurement reporting | Ericsson | imported from 3GU |
R4‑1909463 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1909464 | On RSSI and channel occupancy for NR-U | Ericsson | imported from 3GU |
R4‑1909465 | LS on RSSI and channel occupancy measurements in NR-U | Ericsson | imported from 3GU |
R4‑1909466 | On SCell activation delay in NR-U | Ericsson | imported from 3GU |
R4‑1909467 | On RLM in NR-U | Ericsson | imported from 3GU |
R4‑1909468 | On intra-frequency measurements in NR-U | Ericsson | imported from 3GU |
R4‑1909469 | On the number of cells and SSBs to measure for NR-U UE | Ericsson | imported from 3GU |
R4‑1909470 | On UE measurement reporting criteria in NR-U | Ericsson | imported from 3GU |
R4‑1909471 | On timing reference in NR-U | Ericsson | imported from 3GU |
R4‑1909472 | On TCI requirements for NR-U | Ericsson | imported from 3GU |
R4‑1909473 | UE Transient period capability | Ericsson | imported from 3GU |
R4‑1909474 | Draft CR to TS 38.141-2: Correction of measurement bandwith for OTA transmitter spurious emissions | Ericsson | imported from 3GU |
R4‑1909475 | Draft CR to TS 38.141-2: Correction in test procedure for OTA transmitter spurious emissions | Ericsson | imported from 3GU |
R4‑1909476 | Draft CR to TS 38.141-1: Correction in test procedure for OTA transmitter spurious emissions | Ericsson | imported from 3GU |
R4‑1909477 | Draft CR to TS 38.141-2: Editorial corrections | Ericsson | imported from 3GU |
R4‑1909478 | Draft CR to TS 38.141-1: Editorial corrections | Ericsson | imported from 3GU |
R4‑1909479 | Draft CR to TS 38.141-1: Clarification on BS output power testing | Ericsson | imported from 3GU |
R4‑1909480 | Clarification on BS output power testing | Ericsson | imported from 3GU |
R4‑1909481 | Clarification on BS output power testing | Ericsson | imported from 3GU |
R4‑1909482 | Discussions on cell re-selection requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1909483 | Discussions on serving cell requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1909484 | Discussions on handover requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1909485 | Remaining discussions on RRM requirements for MTC PUR | Ericsson | imported from 3GU |
R4‑1909486 | RSS based RRM measurements for MTC | Ericsson | imported from 3GU |
R4‑1909487 | Discussions about WUS RRM requirements for release 16 MTC | Ericsson | imported from 3GU |
R4‑1909488 | Discussions on serving cell relaxation for cat-M | Ericsson | imported from 3GU |
R4‑1909489 | Applicability of non-BL CE UE requirements in release 16 | Ericsson | imported from 3GU |
R4‑1909490 | Applicability of non-BL CE UE requirements in release 15 | Ericsson | imported from 3GU |
R4‑1909491 | Way forward on Rel-16 MTC RRM enhancement | Ericsson | imported from 3GU |
R4‑1909492 | Remaining discussions on RRM requirements for NB-IoT PUR | Ericsson | imported from 3GU |
R4‑1909493 | Discussions about WUS RRM requirements for release 16 NB-IoT | Ericsson | imported from 3GU |
R4‑1909494 | Remaining discussions on non-anchor carrier RRM measurements | Ericsson | imported from 3GU |
R4‑1909495 | Agreements for Rel-16 NB-IoT RRM enhancement | Ericsson | imported from 3GU |
R4‑1909496 | Discussions on RRM requirements for V2X | Ericsson | imported from 3GU |
R4‑1909497 | Correction of section numbering in handover requirements | Ericsson | imported from 3GU |
R4‑1909498 | Correction of section numbering in handover requirements | Ericsson | imported from 3GU |
R4‑1909499 | Correction of section numbering in handover requirements | Ericsson | imported from 3GU |
R4‑1909500 | Clarification of enhanced coverage UE requirements in IDLE mode for Rel-13 | Ericsson | imported from 3GU |
R4‑1909501 | Clarification of enhanced coverage UE requirements in IDLE mode for Rel-14 | Ericsson | imported from 3GU |
R4‑1909502 | Clarification of normal and enhanced coverage UE requirements in IDLE mode for Rel-15 | Ericsson | imported from 3GU |
R4‑1909503 | Clarification of normal and enhanced coverage UE requirements in IDLE mode for Rel-16 | Ericsson | imported from 3GU |
R4‑1909504 | Analysis of one shot timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1909505 | Threshold for one shot UE timing adjustment requirements (7.1.2.2) | Ericsson | imported from 3GU |
R4‑1909506 | Analysis of TCI states under BWP switching requirements | Ericsson | imported from 3GU |
R4‑1909507 | TCI states under BWP switching requirements (8.6.3) | Ericsson | imported from 3GU |
R4‑1909508 | UE Autonomous Timing Adjustment Requirement under High Speed Scenario | Ericsson | imported from 3GU |
R4‑1909509 | Futher analysis of OTA timing alignment for IAB | Ericsson | imported from 3GU |
R4‑1909510 | LS Response on OTA timing alignment for IAB | Ericsson | imported from 3GU |
R4‑1909511 | Further analysis of RRM Requirement for IAB | Ericsson | imported from 3GU |
R4‑1909512 | On RRC restablishment requirements for NR-U | Ericsson | imported from 3GU |
R4‑1909513 | On RRC redirection requirements for NR-U | Ericsson | imported from 3GU |
R4‑1909514 | Analysis of active BWP switching in NR-U | Ericsson | imported from 3GU |
R4‑1909515 | Rel-16 NR inter-band CA DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909516 | Rel-16 NR inter-band CA DC for 3 bands DL with 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909517 | Proposal for NR V2X Sidelink in the Licensed Band | Vodafone | imported from 3GU |
R4‑1909518 | Discussion on UE initial channel bandwidth | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909519 | draft LS reply to RAN2 on UE initial channel bandwidth | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909520 | draft CR to TS38.101-1_Addition_of_a_new_note_on_UL_MIMO_for_SUL (section 5.2C) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909521 | Draft CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909522 | Draft CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909523 | Draft CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909524 | Draft CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909525 | Draft CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909526 | Draft CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909527 | Simulation results of UCI multiplexing on NR PUSCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909528 | Simulation results collection of multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1909529 | Draft CR to 38.133 on inter frequency SFTD measurement requirements | ZTE | imported from 3GU |
R4‑1909530 | Draft CR to 38.133 on inter frequency SFTD measurement accuracy requirements | ZTE | imported from 3GU |
R4‑1909531 | Reply LS on SFTD measurement | ZTE | imported from 3GU |
R4‑1909532 | Further discussion on DRX based neighbour cell SFTD measurement | ZTE | imported from 3GU |
R4‑1909533 | Discussion on one shot timing adjustment requirements | ZTE | imported from 3GU |
R4‑1909534 | Draft CR to 38.133 on one shot timing adjustment requirements | ZTE | imported from 3GU |
R4‑1909535 | Remaining issues on NR reporting criteria | ZTE | imported from 3GU |
R4‑1909536 | Draft CR to 38.133 NR reporting criteria | ZTE | imported from 3GU |
R4‑1909537 | CR to 36.133 on reporting criteria | ZTE | imported from 3GU |
R4‑1909538 | CR to 36.133 on reporting criteria | ZTE | imported from 3GU |
R4‑1909539 | Reply LS on reporting criteria limitation in MR-DC | ZTE | imported from 3GU |
R4‑1909540 | Discussion on IAB OTA synchronization and RRM requirements | ZTE | imported from 3GU |
R4‑1909541 | draft Reply LS on OTA timing alignment for IAB | ZTE | imported from 3GU |
R4‑1909542 | Mandatory gap patterns for release 16 NR | Ericsson | imported from 3GU |
R4‑1909543 | Further Reply LS on capability of measurement gap patterns | Ericsson | imported from 3GU |
R4‑1909544 | Clean up of measurement gap capabilities | Ericsson | imported from 3GU |
R4‑1909545 | Clean up of measurement gap capabilities | Ericsson | imported from 3GU |
R4‑1909546 | Clean up of measurement gap capabilities in section 9.1.2 | Ericsson | imported from 3GU |
R4‑1909547 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1909548 | Gap sharing between intra- and inter-frequency for NE-DC in section 9.1.5.2.3 | Ericsson | imported from 3GU |
R4‑1909549 | Gap sharing between intra- and inter-frequency for NR-DC in section 9.1.5.2.4 | Ericsson | imported from 3GU |
R4‑1909550 | Further discussion on RAN4 aspects of NR mobility enhancements | Ericsson | imported from 3GU |
R4‑1909551 | Further discussion on RACHless handover for NR | Ericsson | imported from 3GU |
R4‑1909552 | Reply LS on simultaneous RX/TX and RACHless handover for NR with non zero/non equal TA | Ericsson | imported from 3GU |
R4‑1909553 | Discussion on LS on measurements for SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R4‑1909554 | Reply LS on measurements for SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R4‑1909555 | feMOB Impact on RAN4 requirements | Ericsson | imported from 3GU |
R4‑1909556 | SCell RRM measurement requirements in support of 350km/h high speed operation | Ericsson | imported from 3GU |
R4‑1909557 | PCell RRM measurement requirements in support of 500km/h high speed operation | Ericsson | imported from 3GU |
R4‑1909558 | Measurement requirements for LTE further high speed enhancements | Ericsson | imported from 3GU |
R4‑1909559 | Editorial corrections to accuracy tests section A.4.7, A.5.7, A.6.7, A.7.7 | Ericsson | imported from 3GU |
R4‑1909560 | Addition of OTA parameters to SS-RSRP accuracy test in section A.5.7.1 | Ericsson | imported from 3GU |
R4‑1909561 | Addition of OTA parameters to SS-RSRP accuracy test in section A.7.7.1 | Ericsson | imported from 3GU |
R4‑1909562 | Correction of test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Ericsson | imported from 3GU |
R4‑1909563 | correction of test cases for inter-frequency measurement in SA with Pcell in FR1 (section A.6.6.2) | Ericsson | imported from 3GU |
R4‑1909564 | Ideal RSRP in NR RRM tests | Ericsson | imported from 3GU |
R4‑1909565 | Noc level in FR2 RRM tests | Ericsson | imported from 3GU |
R4‑1909566 | Measurement gap applicability for NR-U | Ericsson | imported from 3GU |
R4‑1909567 | Measurement gap requirement delay scaling for NR-U | Ericsson | imported from 3GU |
R4‑1909568 | On UE interruptions for NR-U | Ericsson | imported from 3GU |
R4‑1909569 | RRM specification impact of NR-U | Ericsson | imported from 3GU |
R4‑1909570 | Way forward on RRM specifications for NR-U | Ericsson | imported from 3GU |
R4‑1909571 | Draft CR for NR non-contiguous CA configuration | Verizon, Nokia, Ericsson, Qualcomm | imported from 3GU |
R4‑1909572 | TP for TR 37.716-11-11: MSD requirements for DC_2_n2 | Qualcomm Incorporated | imported from 3GU |
R4‑1909573 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1909574 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1909575 | TR 36.716-02-01-030 Rel-16 2 Bands DL and 1 Band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1909576 | Update TR scope for LTE inter-band Carrier Aggregation for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1909577 | FR2 UE demodulation and CSI testing methodology | Qualcomm Incorporated | imported from 3GU |
R4‑1909578 | Draft CR on TR38.810 for UE demudulation and CSI testing methodlogy | Qualcomm Incorporated | imported from 3GU |
R4‑1909579 | Environmental conditions for NR FR1 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1909580 | Draft CR for TS38.101-4: Angle of arrival for radiated UE demodulation testing | Qualcomm Incorporated | imported from 3GU |
R4‑1909581 | Intra-band non-contiguous ULCA general requirements and MPR consideration for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1909582 | uplink power control for asynchronous NR-DC between FR1 and FR2 | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1909583 | General Requirements for Intra-band Contiguous ULCA for FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1909584 | uplink power control for NR-NR Dual Connectivity | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1909585 | n1 30MHz Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1909586 | n7 Wide BW REFSENS | Qualcomm Incorporated | imported from 3GU |
R4‑1909587 | n38 A-MPR for Wide BW | Qualcomm Incorporated | imported from 3GU |
R4‑1909588 | On NR fast SCell activation | Ericsson | imported from 3GU |
R4‑1909589 | LS reply on NR fast SCell activation | Ericsson | imported from 3GU |
R4‑1909590 | On direct SCell activation | Ericsson | imported from 3GU |
R4‑1909591 | On maximum allowed SCell activation delay for Rel-16 CA | Ericsson | imported from 3GU |
R4‑1909592 | LS reply on maximum allowed SCell activation delay for Rel16 CA | Ericsson | imported from 3GU |
R4‑1909593 | SFTD for NR-U scenario B | Ericsson | imported from 3GU |
R4‑1909594 | CR 38.133 (8.10) Correction to TCI state switching requirement | Ericsson | imported from 3GU |
R4‑1909595 | On TCI state known condition | Ericsson | imported from 3GU |
R4‑1909596 | CR 38.133 (8.9) Correction to PSCell addition/release in NR-DC | Ericsson | imported from 3GU |
R4‑1909597 | CR 38.133 (9.6) Editorial corrections | Ericsson | imported from 3GU |
R4‑1909598 | CR 38.133 (A.7.5.7) TC for PSCell addition and release delay | Ericsson | imported from 3GU |
R4‑1909599 | On measurement gap for SRS-RSRP and CLI-RSSI | Ericsson | imported from 3GU |
R4‑1909600 | LS reply on measurement gap for SRS-RSRP or CLI-RSSI measurements | Ericsson | imported from 3GU |
R4‑1909601 | On scheduling restrictions for SRS-RSRP and CLI-RSSI measurements | Ericsson | imported from 3GU |
R4‑1909602 | On impact of linear phase on SRS-RSRP measurements | Ericsson | imported from 3GU |
R4‑1909603 | On L1-RSRP reporting at SCell activation | Ericsson | imported from 3GU |
R4‑1909604 | CR 38.133 (8.3.2) L1-RSRP reporting at SCell activation | Ericsson | imported from 3GU |
R4‑1909605 | CR 38.133 (8.10.2) TCI state known condition | Ericsson | imported from 3GU |
R4‑1909606 | Discussion on simulations assumptions for power control for IAB | Futurewei | imported from 3GU |
R4‑1909607 | n48 A-MPR Simplification and add missing AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1909608 | Evaluation Periods for RLM, BFD and CBD in NR-U | Qualcomm | imported from 3GU |
R4‑1909609 | Discussion on remaining issues on UE one-shot timing adjustment requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909610 | Draft CR on UE one-shot timing adjustment requirements (section 7.1.2.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909611 | Draft CR on maintaining UE timing requirements (section 7.1 and 7.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1909612 | DraftCR on interruption requirements due to TCI-state switch in FR2 (new section 8.2.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1909613 | DraftCR on correcting the conditions for UE transmit timing (section B.2.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909614 | DraftCR on correcting the scaling factor CSSF for outside gaps (section 9.1.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909615 | DraftCR on correcting the scheduling restrictions requirements for CBD (section 8.5.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1909616 | DraftCR on modifying SSB based measurement accuracy tessts for EN-DC in FR2 (section A.5.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909617 | DraftCR on modifying SSB based measurement accuracy tests for SA in FR2 (section A.7.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909618 | Discussion on test setup for BFD and link recovery tests | Huawei, HiSilicon | imported from 3GU |
R4‑1909619 | DraftCR on correcting antenna configurations (section A.3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909620 | DraftCR on correcting SSB based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.1 and A.4.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909621 | DraftCR on correcting SSB based BFD and link recovery tests for SA in FR1 (section A.6.5.5.1 and A.6.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909622 | DraftCR on correcting SSB based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.1 and A.5.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909623 | DraftCR on correcting SSB based BFD and link recovery tests for SA in FR2 (section A.7.5.5.1 and A.7.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909624 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.3 and A.4.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909625 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 (section A.6.5.5.3 and A.6.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909626 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.3 and A.5.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909627 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 (section A.7.5.5.3 and A.7.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909628 | Discussion on simultaneous connectivity handover of NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1909629 | Discussion on RACH-less handover of NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1909630 | CR on RACH-less handover requirements for NR mobility enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1909631 | Discussion on conditional handover of NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1909632 | Discussion on UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1909633 | WF on UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1909634 | Discussion on RRM requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1909635 | On SSB index acquisition for de-activated SCell measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1909636 | CR on FR2 intra-freqeuncy measurement requriements for de-activated SCell (section 9.2.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1909637 | Discussion on FR2 measurement outside gap | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1909638 | CR on FR2 measurement requriements outside gaps (section 9.1.5.1) | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1909639 | Correction of exception cases in CSSF based requirements (section 9.1.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909640 | CR to update inter-frequency SFTD measurement requirements (section 9.3.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1909641 | Update to interruption requriements for inter-frequency SFTD (section 8.2.2.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909642 | CR to add accuracy requriements for inter-frequency SFTD (section 10.1.21) | Huawei, HiSilicon | imported from 3GU |
R4‑1909643 | Finalization of inter-RAT RSTD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909644 | CR for inter-RAT RSTD measurement on FDD E-UTRA carrier (section 9.4.4.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909645 | CR for inter-RAT RSTD measurement on TDD E-UTRA carrier (section 9.4.4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909646 | Correction to RLM requriements | Huawei, HiSilicon | imported from 3GU |
R4‑1909647 | Correction of interruption requirements for EN-DC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909648 | Correction of interruption requirements for EN-DC in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909649 | Further discussion on Scell activation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909650 | CR on SCell activation requirements for first FR2 Scell (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909651 | CR on SCell activation requirements for Trs (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909652 | Discussion on definition of QCL | Huawei, HiSilicon | imported from 3GU |
R4‑1909653 | CR to add QCL definition (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909654 | On CSI-RS measurement for beam management in DRX | Huawei, HiSilicon | imported from 3GU |
R4‑1909655 | [draft] LS on CSI-RS measurement outside DRX active time | Huawei, HiSilicon | imported from 3GU |
R4‑1909656 | CR on applicability of CSI-RS based BFD (section 8.5.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909657 | Update to L1-RSRP requriements (section 9.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1909658 | Update to TCI states for RRM tests (section A.3.16) | Huawei, HiSilicon | imported from 3GU |
R4‑1909659 | Update to CSI-RS RLM test cases for FR1 EN-DC (section A.4.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909660 | Update to CSI-RS RLM test cases for FR2 EN-DC (section A.5.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909661 | Update to CSI-RS RLM test cases for FR1 SA (section A.6.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909662 | Update to CSI-RS RLM test cases for FR2 SA (section A.7.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909663 | Discussion on timing error for CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1909664 | Discussion on requirements for CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1909665 | Further simulation results for SRS-RSRP measurement performance | Huawei, HiSilicon | imported from 3GU |
R4‑1909666 | [draft] reply LS on on measurement gap for SRS-RSRP or CLI-RSSI measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1909667 | General discussion on RRM work for CA/DC enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1909668 | Discussion on RRM requirements for Rel-16 NR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1909669 | Initial discussion on early measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1909670 | Initial discussion on fast cell access | Huawei, HiSilicon | imported from 3GU |
R4‑1909671 | [draft] Reply LS on maximum allowed SCell activation delay for Rel16 CA | Huawei, HiSilicon | imported from 3GU |
R4‑1909672 | [draft] Reply LS on NR fast SCell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1909673 | Introducing euCA related interruption requirements for EN-DC in 38.133 (section 8.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909674 | Introducing euCA related interruption requirements for NE-DC in 38.133 (section 8.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1909675 | Introducing euCA related interruption requirements for EN-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1909676 | Introducing euCA related interruption requirements for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1909677 | Correction of interruption requirements for NE-DC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909678 | Correction of interruption requirements for NE-DC in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909679 | Correction to MG interruption due to NE-DC in 38.133 (section 9.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909680 | Correction to MG interruption due to NE-DC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909681 | Correction to MG interruption due to NE-DC in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909682 | Correction of PSCell addition requriements for NR-DC (section 8.9.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1909683 | Editorial CR for section 10.1 (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909684 | CR to void sections for L3 CSI-RS measurement accuracy (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1909685 | General discussion on RRM impacts of URLLC | Huawei, HiSilicon | imported from 3GU |
R4‑1909686 | Work plan for eURLLC RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1909687 | [draft] LS on RLM requirements for URLLC | Huawei, HiSilicon | imported from 3GU |
R4‑1909688 | WF on RRM requriements for URLLC | Huawei, HiSilicon | imported from 3GU |
R4‑1909689 | Initial discussion on RRM impacts for NR positioning | Huawei, HiSilicon | imported from 3GU |
R4‑1909690 | Discussion on PRS measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1909691 | [draft] reply LS on Reference Point for Timing Related Measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1909692 | Discussion on quality reporting in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1909693 | Discussion on MWUS requirements in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1909694 | Discussion on PUR in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1909695 | CR for Tx timing requirements for PUR transmission | Huawei, HiSilicon | imported from 3GU |
R4‑1909696 | CR for relaxed serving cell monitoring for Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1909697 | WF on Rel-16 eMTC RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1909698 | Simulation results for RSS based measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1909699 | Correction to direct Scell activation requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909700 | Correction to direct Scell activation requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909701 | Adding RRM measurement requriements for dormant Scell R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909702 | Adding RRM measurement requriements for dormant Scell R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909703 | Update to interruption requirements due to measurement on dormant Scell R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909704 | Update to interruption requirements due to measurement on dormant Scell R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909705 | Adding interruption length requirements for direct Scell activation R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909706 | Adding interruption length requirements for direct Scell activation R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909707 | Adding interruption length requirements for dormant state transition R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909708 | Adding interruption length requirements for dormant state transition R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909709 | Correction to direct Scell activation during HO requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1909710 | Correction to direct Scell activation during HO requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1909711 | Revamping Intra-band Contiguous DLCA RX ACS and IBB requirements for release 16 | Qualcomm Incorporated | imported from 3GU |
R4‑1909712 | Handover delay in NR-U | Qualcomm | imported from 3GU |
R4‑1909713 | Timing Requirements in NR-U | Qualcomm | imported from 3GU |
R4‑1909714 | NR UE System 7-24GHz Noise Figure | Qualcomm Incorporated | imported from 3GU |
R4‑1909715 | CR for 36.101: adding spurious emission band UE co-existence for CA_1-41 | Huawei, HiSilicon | imported from 3GU |
R4‑1909716 | Editorial CR on Test cases for measurement procedure: intra-frequency, inter-frequency, and inter-RAT (A.4.6, A.5.6, A.6.6, A.7.6, A.8.4) | Intel Corporation | imported from 3GU |
R4‑1909717 | draftCR on test cases for EN-DC inter-frequency measurement (section A.4.6.2, A.5.6.2) | Intel Corporation | imported from 3GU |
R4‑1909718 | draftCR on test cases for SA inter-frequency measurement (section A.6.6.2, A.7.6.2) | Intel Corporation | imported from 3GU |
R4‑1909719 | Discussion on band plan for NR-U in 6GHz | Ericsson | imported from 3GU |
R4‑1909720 | only support for synchronous NR-DC between FR1 and FR2 in Rel-15 | Ericsson | imported from 3GU |
R4‑1909721 | draftCR to 38.101-3 on only synchronous NR-DC between FR1 and FR2 support in Rel-15 | Ericsson | imported from 3GU |
R4‑1909722 | TP for R16 MTC TR: PRB Alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1909723 | Draft CR for TR38.810: Integrating re-positioning concept into test procedures | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909724 | Update of RRM Baseline Setup | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909725 | Draft CR for TR38.810: Update of RRM Baseline Setup | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909726 | Minimum Range Length Requirements for DFF Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909727 | TP to 38.827 on Channel Models | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909728 | System implementation of FR1 2D MPAC | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909729 | System Implementation of FR2 3D MPAC | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1909730 | Further discussion on transmit timing requirement for NR V2X | Intel Corporation | imported from 3GU |
R4‑1909731 | Editorial CR on Section 1-3 Scope, references, Definitions, symbols and abbreviations | Intel Corporation | imported from 3GU |
R4‑1909732 | Editorial CR on Section 7.7 deriveSSB-IndexFromCell tolerance | Intel Corporation | imported from 3GU |
R4‑1909733 | Editorial CR on Section 9.1 and 9.6 | Intel Corporation | imported from 3GU |
R4‑1909734 | Draft CR to 38.133 : Testcases for Beam failure detection and Link recovery procedures in FR2 for EN-DC (Section A.5.5.5) | Intel Corporation | imported from 3GU |
R4‑1909735 | Draft CR to 38.133 : Testcases for Beam failure detection and Link recovery procedures in FR1 for SA (Section A.6.5.5) | Intel Corporation | imported from 3GU |
R4‑1909736 | Draft CR to 38.133 : Testcases for Beam failure detection and Link recovery procedures in FR2 for SA (Section A.7.5.5) | Intel Corporation | imported from 3GU |
R4‑1909737 | Draft CR for editorial corrections in TS 38.101-1 | Google Inc. | imported from 3GU |
R4‑1909738 | updated draft TR 38.887 | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1909739 | Update of Parameters, Test case A.7.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1909740 | Transient period capability | Qualcomm Inc | imported from 3GU |
R4‑1909741 | Draft CR for UE transmit timing test case in EN-DC FR1 (Section A.4.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909742 | Draft CR for UE transmit timing test case in EN-DC FR2 (Section A.5.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909743 | Draft CR for UE transmit timing test case in SA FR1 (Section A.6.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909744 | Draft CR for UE transmit timing test case in SA FR2 (Section A.7.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909745 | Draft CR for timing advance test case in EN-DC FR1 (Section A.4.4.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909746 | Draft CR for timing advance test case in EN-DC FR2 (Section A.5.4.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909747 | Draft CR for timing advance test case in SA FR1 (Section A.6.4.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909748 | Draft CR for timing advance test case in SA FR2 (Section A.7.4.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909749 | Draft CR for SS-RSRP performance test case in EN-DC FR1 (Section A.4.7.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909750 | Draft CR for SS-RSRP performance test case in EN-DC FR2 (Section A.5.7.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909751 | Draft CR for SS-RSRP performance test case in SA FR1 (Section A.6.7.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909752 | Draft CR for SS-RSRP performance test case in SA FR2 (Section A.7.7.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909753 | Draft CR for SSB based RLM test cases in EN-DC FR1 (Section A.4.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909754 | Draft CR for SSB-RLM test cases in EN-DC FR2 (Section A.5.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909755 | Draft CR for SSB based RLM test cases in SA FR1 (Section A.6.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909756 | Draft CR for SSB-RLM test cases in SA FR2 (Section A.7.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909757 | Draft CR for SCell activation test cases in EN-DC FR1 (Section A.4.5.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909758 | Draft CR for SCell activation test cases in EN-DC FR2 (Section A.5.5.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909759 | Draft CR for SCell activation test cases in SA FR1 (Section A.6.5.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909760 | Draft CR for SCell activation test cases in SA FR2 (Section A.7.5.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909761 | Draft CR for PSCell addition test case in EN-DC FR1 (Section A.4.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1909762 | Draft CR for PSCell addition test case in EN-DC FR2 (Section A.5.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1909763 | Draft CR for L1-RSRP test cases in EN-DC FR1 (Section A.4.6.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909764 | Draft CR for L1-RSRP test cases in EN-DC FR2 (Section A.5.6.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1909765 | Draft CR for L1-RSRP performance test case in EN-DC FR1 (Section A.4.7.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1909766 | Draft CR for L1-RSRP performance test case in EN-DC FR2 (Section A.5.7.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1909767 | Draft CR for L1-RSRP performance test case in SA FR1 (Section A.6.7.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1909768 | Draft CR for L1-RSRP performance test case in SA FR2 (Section A.7.7.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1909769 | Draft CR for intra-frequency measurement test cases in EN-DC FR1 (Section A.4.6.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909770 | Draft CR for intra-frequency measurement test cases in EN-DC FR2 (Section A.5.6.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909771 | Draft CR for intra-frequency measurement test cases in SA FR1 (Section A.6.6.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909772 | Draft CR for intra-frequency measurement test cases in EN-DC FR2 (Section A.7.6.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909773 | Draft CR for interruptions on transition between active and non active (Section A.4.5.2) | Qualcomm Incorporated | imported from 3GU |
R4‑1909774 | Draft CR for interruptions in ENDC-FR2 (Section A.5.5.2) | Qualcomm Incorporated | imported from 3GU |
R4‑1909775 | Draft CR for interruptions in SA FR2 (Section A.7.5.2) | Qualcomm Incorporated | imported from 3GU |
R4‑1909776 | Draft CR for CSI-RS based RLM test cases in EN-DC FR1 (Section A.4.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909777 | Draft CR for CSI-RS based RLM test cases in EN-DC FR2 (Section A.5.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909778 | Draft CR for CSI-RS based RLM test cases in SA FR1 (Section A.6.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909779 | Draft CR for CSI-RS based RLM test cases in SA FR2 (Section A.7.5.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1909780 | Revised WID Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1909781 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1909782 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1909783 | Revised WID 4 bands NR CA Rel-16 | Ericsson | imported from 3GU |
R4‑1909784 | TR 38.716-01-01 v0.6.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1909785 | TR 37.716-31-11 v0.6.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1909786 | TR 38.716-04-01 v0.0.1 TR skeleton | Ericsson | imported from 3GU |
R4‑1909787 | TP for TR 36.716-01-01 for updated scope from RAN #84 | Ericsson | imported from 3GU |
R4‑1909788 | TP for TR 38.716-01-01 for updated scope from RAN #84 | Ericsson | imported from 3GU |
R4‑1909789 | TP for TR 37.716-31-11 for updated scope from RAN #84 | Ericsson | imported from 3GU |
R4‑1909790 | CR introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1909791 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1909792 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1909793 | draft CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1909794 | Rel-16 CR to 36.101 to correct typos | Ericsson | imported from 3GU |
R4‑1909795 | draft Rel-16 CR for editorial corrections in 2 band configuration tables in 38.101-3 | Ericsson | imported from 3GU |
R4‑1909796 | draft Rel-16 CR for editorial corrections in 3 band configuration tables in 38.101-3 | Ericsson | imported from 3GU |
R4‑1909797 | draft Rel-16 CR for editorial corrections in 4 and 5 band configuration tables in 38.101-3 | Ericsson | imported from 3GU |
R4‑1909798 | draft Rel-15 CR to cleanup configuration tables in 38.101-3 | Ericsson | imported from 3GU |
R4‑1909799 | draft Rel-16 CR for further simplication of 38.101-2 Table 5.5A.2-2 | Ericsson | imported from 3GU |
R4‑1909800 | TP for TR 37 716-11-11 to correct DC_28_n8 to correct spurious emission table for DC_28_n8 | Ericsson | imported from 3GU |
R4‑1909801 | draft CR to 38.101-3 to remove square brackets for DC_66_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909802 | TP for TR 37.716-21-21 to conclude DC_66A_n25A-n41A | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909803 | TP for TR 37.716-21-11 to include DC_2A-66A_n41A | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909804 | TP for TR 37.716-21-21 to include DC_2_n41-n260 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909805 | TP for TR 37.716-21-21 to include DC_66_n41-n260 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909806 | draft Rel-16 CR to 38.101-3 to add CA configurations for n25-n260, n41-n260 and n71-n260 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909807 | draft Rel-16 CR to 38.101-3 to add DC configurations for n48-n260 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909808 | TP for TR 37.716-21-11 to include DC_46A-48A_n260A | Ericsson, T-Mobile US | imported from 3GU |
R4‑1909809 | TP for TR 38.716-01-01 to include CA_n5B | Ericsson, Verizon | imported from 3GU |
R4‑1909810 | draft Rel-16 CR to 38.101-2 to add non-contiguous FR2 Intra-band CA configurations | Ericsson, Verizon | imported from 3GU |
R4‑1909811 | draft Rel-16 CR to 38.101-3 to add missing fallbacks and to correct some typos | Ericsson, AT&T | imported from 3GU |
R4‑1909812 | TP for TR 37.716-21-11 to include 12A-30A_n2A | Ericsson, AT&T | imported from 3GU |
R4‑1909813 | TP for TR 37.716-21-11 to include 12A-66A_n2A and 12A-66A-66A_n2A | Ericsson, AT&T | imported from 3GU |
R4‑1909814 | TP for TR 37.716-21-11 to include 30A-66A_n2A and 30A-66A-66A_n2A | Ericsson, AT&T | imported from 3GU |
R4‑1909815 | TP for TR 37.716-31-11 to include 2A-12A-30A_n66A and 2A-2A-12A-30A_n66A | Ericsson, AT&T | imported from 3GU |
R4‑1909816 | TP for TR 37.716-31-11 to include 12A-30A-66A_n2A and 12A-30A-66A-66A_n2A | Ericsson, AT&T | imported from 3GU |
R4‑1909817 | TP for TR 37.716-11-11 to include 14A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909818 | TP for TR 37.716-21-11 to include 14A-30A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909819 | TP for TR 37.716-21-11 to include 14A-66A_n260M and 14A-66A-66A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909820 | TP for TR 37.716-21-11 to include 2A-14A_n260M and 2A-2A-14A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909821 | TP for TR 37.716-31-11 to include 2A-14A-30A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909822 | TP for TR 37.716-31-11 to include 2A-14A-66A_n260M, 2A-14A-66A-66A_n260M, 2A-2A-14A-66A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909823 | TP for TR 37.716-31-11 to include 14A-30A-66A_n260M, 14A-30A-66A-66A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909824 | TP for TR 37.716-41-11 to include 2A-14A-30A-66A_n260M | Ericsson, AT&T | imported from 3GU |
R4‑1909825 | TP for TR 37.716-41-11 to correct 1A-3C-7C-28A_n78A | Ericsson, Telstra | imported from 3GU |
R4‑1909826 | TP for TR 37.716-21-21 to include DC_1_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909827 | TP for TR 37.716-21-21 to include DC_3_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909828 | TP for TR 37.716-21-21 to include DC_7_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909829 | TP for TR 37.716-21-21 to include DC_28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909830 | TP for TR 37.716-21-21 to include DC_1-3_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909831 | TP for TR 37.716-21-21 to include DC_1-7_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909832 | TP for TR 37.716-21-21 to include DC_1-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909833 | TP for TR 37.716-21-21 to include DC_3-7_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909834 | TP for TR 37.716-21-21 to include DC_3-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909835 | TP for TR 37.716-21-21 to include DC_7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909836 | TP for TR 37.716-21-21 to include DC_1-3-7_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909837 | TP for TR 37.716-21-21 to include DC_1-3-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909838 | TP for TR 37.716-21-21 to include DC_1-7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909839 | TP for TR 37.716-21-21 to include DC_3-7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909840 | TP for TR 37.716-21-21 to include DC_1-3-7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1909841 | TP for TR 36.716-02-01 to include CA configurations for 1-3, 1-7 | Ericsson, Telstra | imported from 3GU |
R4‑1909842 | TP for TR 36.716-03-01 to include CA configurations for 1-3-28, 1-7-28, 1-3-7, 1-7-28 | Ericsson, Telstra | imported from 3GU |
R4‑1909843 | TP for TR 36.716-04-01 to include CA configurations for 1-3-7-28 | Ericsson, Telstra | imported from 3GU |
R4‑1909844 | TP for TR 37.716-11-11 to include 7A_n3A | Ericsson, Swisscom | imported from 3GU |
R4‑1909845 | [Draft] Reply LS on RAN1/4 feature lists | Intel Corporation | imported from 3GU |
R4‑1909846 | [Draft] Reply LS on supported BW for initial BWP | Intel Corporation | imported from 3GU |
R4‑1909847 | Performance requirements for intra-band contiguous CA with minimum channel spacing | Huawei, HiSilicon, China Telecom | imported from 3GU |
R4‑1909848 | CR: Addition of the performance requirements for intra-band contiguous CA with minimum channel spacing for FDD | Huawei, HiSilicon | imported from 3GU |
R4‑1909849 | Simulation results for LTE UE HST-SFN CA demodualtion requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909850 | Discuss and simulation results for UE demodulation requirements for LTE HST enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1909851 | Discuss and simulation results for BS demodulation requirements for LTE HST enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1909852 | Discussion and simulation results for LTE Rel-15 FeNB-IoT TDD NPRACH | Huawei, HiSilicon | imported from 3GU |
R4‑1909853 | Discuss on Rel-16 UE demodulation performance requirements for CA | Huawei, HiSilicon | imported from 3GU |
R4‑1909854 | draftCR: test structure for NR FR1 CA normal demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909855 | draftCR: test structure for NR FR2 CA normal demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909856 | Discussion on LTE-NR coexistence demodulation requirements for TDD | Huawei, HiSilicon | imported from 3GU |
R4‑1909857 | Discussion on Rel-16 BS demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909858 | Discsuss on NR UE demod requirements for R15 late drop | Huawei, HiSilicon | imported from 3GU |
R4‑1909859 | Discussion on addition of test applicaiblity for features with UE capability | Huawei, HiSilicon | imported from 3GU |
R4‑1909860 | draftCR: addition of test applicability for features with UE capability | Huawei, HiSilicon | imported from 3GU |
R4‑1909861 | draft CR: updates to FR1 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1909862 | draft CR: updates to FR2 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1909863 | Updates to NR PDCCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1909864 | draftCR: Introduce single-tap HST channel model in TS 38.101-4 | Huawei, HiSilicon | imported from 3GU |
R4‑1909865 | Discussion on remaining issues for NR Rel-15 BS demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909866 | Simulation results for UCI multiplexing on PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑1909867 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1909868 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909869 | draftCR: Updates to PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1909870 | draftCR: Updates to PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1909871 | draftCR: Updates to PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1909872 | Work Plan for URLLC demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909873 | Discussion on URLLC test methodology | Huawei, HiSilicon | imported from 3GU |
R4‑1909874 | Discussion on scenario and transmission schemes for NR Rel-16 HST | Huawei, HiSilicon | imported from 3GU |
R4‑1909875 | Discuss on the maximum supported Doppler shift for NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1909876 | Discuss on UE demodulation requirements for NR Rel-16 HST | Huawei, HiSilicon | imported from 3GU |
R4‑1909877 | Discuss on BS demodulation requirements for NR Rel-16 HST | Huawei, HiSilicon | imported from 3GU |
R4‑1909878 | CR for editorial corrections in TS 38.101-1 | Google Inc. | imported from 3GU |
R4‑1909879 | TP to TR 38.820 on the propagation conditions in 7-24 GHz | Huawei, HiSilicon, | imported from 3GU |
R4‑1909880 | Evaluation of the electrical properties of materials of the spectrum in frequency range 7-24GHz and TP to TR 38.820 | Huawei, HiSilicon | imported from 3GU |
R4‑1909881 | Update NS_40 into TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1909882 | Update NS_42 into TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1909883 | LS reply on supported BW for initial BWP | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909884 | Enhanced spherical coverage requirement for FR2 PC3 UE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909885 | CR for excluding tone locations in GB operation for B26 | Qualcomm Inc | imported from 3GU |
R4‑1909886 | Discussion on RRM open issues for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909887 | BS demodulation simulation results of PUSCH for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909888 | New WID: New power class for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1909889 | CR to TS 36.133: capturing agreements on measurements for LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909890 | Power imbalance requirement for intra-band EN-DC/NR CA | DOCOMO Communications Lab. | imported from 3GU |
R4‑1909891 | On beam-based directions for TRP estimates of in-band unwanted emissions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909892 | PDSCH demodulation requirement for new TDD pattern with 50% uplink | DOCOMO Communications Lab. | imported from 3GU |
R4‑1909893 | CR to TR 37.843: adding background information on in-band unwanted emissions using beam-based directions in subclause 10.8.3.1.4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909894 | Views on testability for URLLC performance requirements | DOCOMO Communications Lab. | imported from 3GU |
R4‑1909895 | TP for 38.716-01-01: CA_n41C and CA_n41(2A) BCS1 | Sprint Corporation | imported from 3GU |
R4‑1909896 | Draft CR for 38.101-1: CA_n41C BCS1 | Sprint Corporation | imported from 3GU |
R4‑1909897 | TP for 38.716-01-01 CA_n25(2A) REFSENS | Sprint Corporation | imported from 3GU |
R4‑1909898 | Draft CR for 38.101-1 CA_n25(2A) REFSENS | Sprint Corporation | imported from 3GU |
R4‑1909899 | 29 dBm HPUE SAR and Duty Cycle | Sprint Corporation | imported from 3GU |
R4‑1909900 | 29 dBm Neighbor Coexistence | Sprint Corporation, Ericsson | imported from 3GU |
R4‑1909901 | CR for 38.101-3: B41 n41 EN-DC allocation based A-MPR | Sprint Corporation | imported from 3GU |
R4‑1909902 | 29 dBm In-Device Impact on Band7/n7 and Band 38/n38 | Sprint Corporation | imported from 3GU |
R4‑1909903 | Draft CR for 38.101-3: Correction of Note 2 in Table 5.5B.2-1 | Sprint Corporation, Ericsson, Google | imported from 3GU |
R4‑1909904 | Draft CR for 38.101-3: Correction of n5 combinations protection for B26 | Sprint Corporation | imported from 3GU |
R4‑1909905 | Introduction of completed LTE CA for 2 bands DL with 2 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1909906 | TR 36.716-02-02 v0.5.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1909907 | Revised WID for LTE inter-band CA for 2 bands DL with 2 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1909908 | Further consideration on SAR solutions for FDD+TDD HPUE | Huawei, HiSilicon | imported from 3GU |
R4‑1909909 | On deriving FDD+TDD TDM pattern based on max UL duty cycle capability | Huawei, HiSilicon | imported from 3GU |
R4‑1909910 | TP for TR 37.815 Example TDM patterns for SAR limits | Huawei, HiSilicon | imported from 3GU |
R4‑1909911 | On EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1909912 | Draft CR on EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1909913 | Consideration on Rel-16 NR RF FR1 WI | Huawei, HiSilicon | imported from 3GU |
R4‑1909914 | MSD analysis for DC_38A_n78A due to cross band isolation | Huawei, HiSilicon | imported from 3GU |
R4‑1909915 | TP for TR 38.887 BS RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909916 | On UE RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1909917 | On switching time between LTE SL and NR SL | Huawei, HiSilicon | imported from 3GU |
R4‑1909918 | On UE framework for NR-V2X in licensed bands | Huawei, HiSilicon | imported from 3GU |
R4‑1909919 | Draft CR for TS 38.101-1 Correction of SRS with IL | Huawei, HiSilicon | imported from 3GU |
R4‑1909920 | Draft CR for TS 38.101-1 Correction of referd table for NBB | Huawei, HiSilicon | imported from 3GU |
R4‑1909921 | On supporting CA_n77-n78 | Huawei, HiSilicon, KDDI | imported from 3GU |
R4‑1909922 | On UL MIMO and Tx diversity requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1909923 | On UE to UE Coexistence study of NR V2X at 5.9GHz | Qualcomm Inc | imported from 3GU |
R4‑1909924 | OTA timing alignment for IAB Networks | Qualcomm | imported from 3GU |
R4‑1909925 | Discussion on LTE HST UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1909926 | On the test methodology for low latency requirements | Nokia Corporation | imported from 3GU |
R4‑1909927 | Power Boost and IBE in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1909928 | On further changes to FR2 absolute power tolerance requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1909929 | Defining RRM requirements for IAB nodes | Qualcomm | imported from 3GU |
R4‑1909930 | Minimum required gap between paging grant and the corresponding SI grant | Qualcomm | imported from 3GU |
R4‑1909931 | Minimum required gap between paging grant and the corresponding SI grant | Qualcomm | imported from 3GU |
R4‑1909932 | NR MIMO OTA Ad-hoc meeting notes | CAICT | imported from 3GU |
R4‑1909933 | On power class requirements for band n259 | Intel Corporation | imported from 3GU |
R4‑1909934 | FR2 power classes and UE type considerations in test methods | Intel Corporation | imported from 3GU |
R4‑1909935 | WF on NR MIMO OTA | CAICT | imported from 3GU |
R4‑1909936 | TR38.827 v1.0.1 NR MIMO OTA | CAICT | imported from 3GU |
R4‑1909937 | 2nd Harmonic Mixing for MB+NR and Missing MSD for B3_n77/n78 | Qualcomm Incorporated | imported from 3GU |
R4‑1909938 | TP to TR38.827 v1.0.1 on Abbreviations | CAICT | imported from 3GU |
R4‑1909939 | Measurements for B14/n41 A-MPR with Varied Isolation | SPRINT Corporation | imported from 3GU |
R4‑1909940 | RF transient times requirements use cases and testability | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909941 | CR for PRACH configuration indices of RRM test cases | Qualcomm | imported from 3GU |
R4‑1909942 | Experimental measurements for n7 30,40,50MHz REFSENS | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909943 | dCR to 38.101-3 Missing Harmonic Mixing MSD for DC_3_n77/n78 | Qualcomm Incorporated | imported from 3GU |
R4‑1909944 | Corrections and further MSD due to cross-band isolation studies for EN-DC in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909945 | Inner RB Allocations Region 1 Extension For Power Class 3 Operation in FR2 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909946 | B42_n79 for UE supporting NR bands n78 and n79 only | Qualcomm Incorporated | imported from 3GU |
R4‑1909947 | Draft CR for Scell activation requirements (Section 8.3.2) | Qualcomm Incorporated | imported from 3GU |
R4‑1909948 | Draft CR for MAC-CE based TCI state switch (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1909949 | Draft CR for RRC based TCI state switch (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1909950 | UL one shot timing adjustment | Qualcomm Incorporated | imported from 3GU |
R4‑1909951 | SCell Activation Timeline where UE only needs one SSB | Qualcomm Incorporated | imported from 3GU |
R4‑1909952 | EN-DC MSD Test Point Refinements for FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909953 | Introduction of LTE and NR power levels for DC_(n)71AA MSD Test Points | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909954 | draftCR 38.101-1 Addition of footnote for n28 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909955 | CR_38.101-3 Rel 16 Addition of footnote 3 to DC_40A_n41A | Skyworks Solutions Inc. | imported from 3GU |
R4‑1909956 | dCR to 38.101-3 EN-DC RX Out-of-Band Blocking for Inter-bands treated as Intra-band | Qualcomm Incorporated | imported from 3GU |
R4‑1909957 | CATR Phase Sensitivity | ETS-Lindgren Europe | imported from 3GU |
R4‑1909958 | Requirements for ENDC Inter-band combination that share common RX path | Qualcomm Incorporated | imported from 3GU |
R4‑1909959 | draftCR to 38.101-1 NS_05 AMPR RBstart correction for CIM3 | Qualcomm Incorporated | imported from 3GU |
R4‑1909960 | n39 Coexistence Issue and Missing AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1909961 | Views on NR Application Layer Throughput Requirements | Qualcomm Incorporated, BT plc., Verizon Wireless | imported from 3GU |
R4‑1909962 | Achievable SNR during beam correspondence testing | Qualcomm | imported from 3GU |
R4‑1909963 | NS_43 A-MPR threshold modification and A-MPR reduction | Qualcomm Incorporated | imported from 3GU |
R4‑1909964 | draftCR to 38.101-1 NS_43 AMPR MPR threshold change and AMPR reduction | Qualcomm Incorporated | imported from 3GU |
R4‑1909965 | TP for TR 36.cde: LTE-MTC in-band deployment configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909966 | TP for TR 36.cde: LTE-MTC in-band deployment configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909967 | Draft CR for handling of EN-DC BCS for TS 38.101-3 | NTT DOCOMO INC. | imported from 3GU |
R4‑1909968 | draftCR to 38.101-1. Add missing AMPR to NS27 | Qualcomm Incorporated | imported from 3GU |
R4‑1909969 | CR to 38.101-1. Revamp CA ACS and IBB tables to differentiate by band numbers and not frequency. | Qualcomm Incorporated | imported from 3GU |
R4‑1909970 | n259 RF Parameters | Qualcomm Incorporated | imported from 3GU |
R4‑1909971 | New WID on NR FR2 Power class 5 UE | Huawei, HiSilicon | imported from 3GU |
R4‑1909972 | CR to 38.101-1. Add missing AMPR to NS27 | Qualcomm Incorporated | imported from 3GU |
R4‑1909973 | New WID: Introduction of NR Band n26 | Sprint Corporation, AT&T | imported from 3GU |
R4‑1909974 | WF on NR-U RRM requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1909975 | On the Lack of a Dynamic Power Sharing Requirement in TS 38.101-3 | Motorola Mobility España SA | imported from 3GU |
R4‑1909976 | Minor Corrections to 38.101-3 clause 6.2B.4.1.1 | Motorola Mobility España SA | imported from 3GU |
R4‑1909977 | draftCR to 38.101-3 for missing Harmonic Mixing MSD for DC_11A_n79A like DC_21A_n79A | Qualcomm Incorporated | imported from 3GU |
R4‑1909978 | Placeholder for WF on IAB RRM requirements | Qualcomm | imported from 3GU |
R4‑1909979 | draftCR to 38.101-3 for missing IMD MSD for shared bands that already have MSD | Qualcomm Incorporated | imported from 3GU |
R4‑1909980 | Skeleton of Rel-16 IAB RAN4 Spec | Qualcomm | imported from 3GU |
R4‑1909981 | FR2 power class enhancement | NTT DOCOMO INC. | imported from 3GU |
R4‑1909982 | On testability aspects of FR2 DL 256QAM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909983 | Update SNR range calculations and spreadsheets for RRM and Demodulation | ANRITSU LTD | imported from 3GU |
R4‑1909984 | CR for PRACH configuration indices of RRM test cases | Qualcomm | imported from 3GU |
R4‑1909985 | DraftCR on correcting the conditions for UE transmit timing (section B.2.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1909986 | Threshold for one shot UE timing adjustment requirements (7.1.2.2) | Ericsson | imported from 3GU |
R4‑1909987 | Way forward on RRM specifications for NR-U | Ericsson | imported from 3GU |
R4‑1909988 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1909989 | Number of additional DM-RS for high Doppler scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1909990 | Ad hoc minutes for NR high speed enhancement | CMCC | imported from 3GU |
R4‑1909991 | Way forward on CLI RRM | LGE | imported from 3GU |
R4‑1909992 | Reply LS on simultaneous RX/TX for NR | Ericsson | imported from 3GU |
R4‑1909993 | WF on UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1909994 | WF on NR V2X RRM requirement scope | LG Electronics | imported from 3GU |
R4‑1909995 | Reply LS on maximum allowed SCell activation delay for Rel16 CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1909996 | [draft] Reply LS on NR fast SCell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1909997 | Way forward on MR-DC RRM | Nokia | imported from 3GU |
R4‑1909998 | Discussion and simulation results for BS performance with HST in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1909999 | Reply LS on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1910000 | Void | void | imported from 3GU |
R4‑1910001 | On RAN4 time plan for NR positioning | Intel Corporation | imported from 3GU |
R4‑1910002 | Time plan and system-level assumptions for RSTD simulations in NR | Ericsson | imported from 3GU |
R4‑1910003 | Way forward on LTE mobility enhancement | Nokia | imported from 3GU |
R4‑1910004 | Way forward on LTE HST RRM | RD sessionNTT DOCOMO | imported from 3GU |
R4‑1910005 | Ad hoc minutes for Rel-15/16 NR UE demodulation and CSI requirements | China Telecom | imported from 3GU |
R4‑1910006 | Ad hoc minutes for Rel-15/16 BS demodulation requirements | Huawei | imported from 3GU |
R4‑1910007 | Ad hoc minutes for general part of Rel-15 NR RRM performance | Ericsson | imported from 3GU |
R4‑1910008 | Ad hoc minutes for Rel-15 NR RRM test cases | Huawei | imported from 3GU |
R4‑1910009 | Ad hoc minutes for Rel-15 NR signalling characteristic requirements | Intel | imported from 3GU |
R4‑1910010 | Ad hoc minutes for NR-U RRM | Ericsson | imported from 3GU |
R4‑1910011 | Simulation results for LTE UE HST-SFN CA demodualtion requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1910012 | Discuss and simulation results for UE demodulation requirements for LTE HST enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1910013 | Discuss and simulation results for BS demodulation requirements for LTE HST enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1910014 | Discussion and simulation results for LTE Rel-15 FeNB-IoT TDD NPRACH | Huawei, HiSilicon | imported from 3GU |
R4‑1910015 | Simulation results for UCI multiplexing on PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑1910016 | Way forward on PDSCH CA normal demodulation requirements | Intel | imported from 3GU |
R4‑1910017 | Way forward on PMI reporting requirements for Tx ports larger than 8 and up to 32 | Ericsson | imported from 3GU |
R4‑1910018 | Way forward on TDD LTE-NR co-existence demodulation requirements | Huawei | imported from 3GU |
R4‑1910019 | Way forward on NR Application Layer Throughput Performance | Qualcomm, BT plc, Verizon, AT&T, China Telecom, NTT Docomo, Orange, CMCC, Vodafone, Telecom Italia | imported from 3GU |
R4‑1910020 | Antenna configuration for LTE cell in EN-DC | ANRITSU LTD | imported from 3GU |
R4‑1910021 | DraftCR to 38.101-4 : Corrections to Interworking requirements | Intel Corporation | imported from 3GU |
R4‑1910022 | Draft CR to TS 38.101-4: Applicability of minimum requirements | Intel Corporation | imported from 3GU |
R4‑1910023 | Draft CR to TS 38.101-4: Enhanced SU-MIMO receiver definition | Intel Corporation | imported from 3GU |
R4‑1910024 | draftCR: addition of test applicability for features with UE capability | Huawei, HiSilicon | imported from 3GU |
R4‑1910025 | Work plan for eURLLC RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1910026 | LS Reply on measurements for SRVCC from 5G to 3G | Huawei, HiSilicon | imported from 3GU |
R4‑1910027 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1910028 | Editorial CR on Test cases for measurement procedure: intra-frequency, inter-frequency, and inter-RAT (A.4.6, A.5.6, A.6.6, A.7.6, A.8.4) | Intel Corporation | imported from 3GU |
R4‑1910029 | Editorial CR on Section 1-3 Scope, references, Definitions, symbols and abbreviations | Intel Corporation | imported from 3GU |
R4‑1910030 | Measurement capability for NR- UMTS for SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1910031 | CR on TS38.133 for gap pattern signaling (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1910032 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1910033 | Correction on requiremnts applicability for inter-RAT NR measurements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1910034 | Correction on requiremnts applicability for intra-NR measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1910035 | Editorial CR on idle state mobility (section 4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910036 | Requirements for PSCell change in ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1910037 | Editorial CR on Section 7.5 and 7.6(MTTR and MRTD) | LG Electronics | imported from 3GU |
R4‑1910038 | Draft CR on maintaining UE timing requirements (section 7.1 and 7.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1910039 | editorial CR for section 8.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910040 | Draft CR to 38.133: SCell activation delay requirements on FR2 band | NEC | imported from 3GU |
R4‑1910041 | CR on PSCell addition in ENDC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1910042 | CR for TCI state switching requirements (section 8.10) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910043 | Ad hoc minutes for URLLC demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1910044 | Way forward on URLLC demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1910045 | Reply LS to RAN5 to update 38.101-4 with Link Adaptation requirements | Qualcomm | imported from 3GU |
R4‑1910046 | Way forward on PDSCH CA normal demodulation requirements | Intel | imported from 3GU |
R4‑1910047 | Void | void | imported from 3GU |
R4‑1910048 | Correction of CSI-RS configurations used for NR RRM tests | Ericsson | imported from 3GU |
R4‑1910049 | Offline discussion miniutes for CSI-RS configuration for RRM tests | Ericsson | imported from 3GU |
R4‑1910050 | WF on demodulation for UE NR HST | CMCC | imported from 3GU |
R4‑1910051 | Work plan for demodulation part of NR support for high speed train scenario | CMCC | imported from 3GU |
R4‑1910052 | Way forward on UE demodulation requirements with power imbalance | NTT DOCOMO | imported from 3GU |
R4‑1910053 | Draft CR on corrections and missing parameters for PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1910054 | Draft CR to TS 38.101-4: NR FR1 PDSCH requirements finalization | Intel Corporation | imported from 3GU |
R4‑1910055 | Draft CR to TS 38.101-4: Corrections for SDR requirements | Intel Corporation | imported from 3GU |
R4‑1910056 | Editorial correction to formatting on SDR table | Ericsson | imported from 3GU |
R4‑1910057 | draft CR: updates to FR1 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1910058 | Draft CR on corrections for PDCCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1910059 | Updates to NR PDCCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1910060 | Draft CR on corrections for CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1910061 | Draft CR on updates to FR1 CSI reporting test | Huawei, Hisilicon | imported from 3GU |
R4‑1910062 | Draft CR on updates to FR2 CSI reporting test | Huawei, Hisilicon | imported from 3GU |
R4‑1910063 | Way forward on NR Rel-15 BS demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1910064 | Draft CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1910065 | Draft CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1910066 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1910067 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1910068 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1910069 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1910070 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1910071 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1910072 | Draft CR on NR UCI on PUSCH performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1910073 | Draft CR on NR UCI on PUSCH conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1910074 | Draft CR on NR UCI on PUSCH radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1910075 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910076 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910077 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910078 | Draft CR to TS38.104: Updates to NR PRACH performance requirements | CATT | imported from 3GU |
R4‑1910079 | Draft CR to TS38.141-1: Updates to NR PRACH performance requirements | CATT | imported from 3GU |
R4‑1910080 | Draft CR to TS38.141-2: Updates to NR PRACH performance requirements | CATT | imported from 3GU |
R4‑1910081 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1910082 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1910083 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1910084 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1910085 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1910086 | Draft CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910087 | Draft CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910088 | Draft CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910089 | Draft CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910090 | Draft CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910091 | Draft CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910092 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1910093 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1910094 | draftCR: Updates to PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1910095 | draftCR: Updates to PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1910096 | draftCR: Updates to PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1910097 | CR for extending HST-SFN tests to CA in Rel-16 | Ericsson | imported from 3GU |
R4‑1910098 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1910099 | CR: Demod test definition for HST in 500km/h speed | Qualcomm Incorporated | imported from 3GU |
R4‑1910100 | CR to 36.104 on LTE HST PUSCH conditions | Ericsson | imported from 3GU |
R4‑1910101 | Way forward on LTE UE HST performance requirements | NTT DOCOMO | imported from 3GU |
R4‑1910102 | Way forward on LTE BS demodulation performance requirements | NTT DOCOMO | imported from 3GU |
R4‑1910103 | Clean up of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1910104 | Way forward on RLM test setup | Huawei, HiSilicon, Mediatek, Nokia, Nokia Shanghai Bell, Samsung, Intel, Qualcomm, NTT DOCOMO | imported from 3GU |
R4‑1910105 | Way forward on Rel-15 BFR test setup | Mediatek | imported from 3GU |
R4‑1910106 | Draft CR on TS38.133 on conditions for FR1 inter-frequency measurement accuracy (section 10.1.4, 10.1.9, 10.1.14, B.2.3) | CMCC | imported from 3GU |
R4‑1910107 | Way forward on Rel-16 MTC RRM enhancement | Ericsson, Qualcomm Incorporated, Huawei, HiSilicon | imported from 3GU |
R4‑1910108 | Official offline minutes on Rel-15 inter-RAT RSTD | Ericsson | imported from 3GU |
R4‑1910109 | LS on evaluation of S criteria on non-anchor carrier | Huawei | imported from 3GU |
R4‑1910110 | Reply to LS on DL channel quality report for configured carrier in RRC connected mode | Qualcomm Incorporated | imported from 3GU |
R4‑1910111 | Reply LS on reporting criteria limitation in MR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1910112 | Reply LS on reporting criteria limitation in MR-DC | ZTE | imported from 3GU |
R4‑1910113 | E-UTRAN time acquisition requirements for E-UTRA FDD RSTD measurements (section 9.4.4) | Ericsson | imported from 3GU |
R4‑1910114 | CR for inter-RAT RSTD measurement on TDD E-UTRA carrier (section 9.4.4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910115 | Gap sharing between intra- and inter-frequency for NE-DC in section 9.1.5.2.3 | Ericsson | imported from 3GU |
R4‑1910116 | CR on TS38.133 for SFTD measurement requirements for NR SA (Section 9.3.8) | MediaTek inc. | imported from 3GU |
R4‑1910117 | CR on idle mode requirements in HST scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1910118 | CR on Pcell measurement enhancement requirements in HST scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1910119 | Measurement requirements for LTE further high speed enhancements | Ericsson | imported from 3GU |
R4‑1910120 | UE Autonomous Timing Adjustment Requirement under High Speed Scenario | Ericsson | imported from 3GU |
R4‑1910121 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for EN-DC FR1 (section A.4.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1910122 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for SA FR1 (section A.6.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1910123 | Clarification of normal and enhanced coverage UE requirements in IDLE mode for Rel-15 | Ericsson | imported from 3GU |
R4‑1910124 | Corrections to test case for HD – FDD Inter frequency reselection case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm Incorporated | imported from 3GU |
R4‑1910125 | Clarification of Rmax for NB-IoT MSG3-based channel quality report | Ericsson | imported from 3GU |
R4‑1910126 | Way forward on NR BS HST demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1910127 | Work Plan for URLLC demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1910128 | Way forward on NR BS HST demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1910129 | Draft CR to TS 38.101-4: Applicability of minimum requirements | Intel Corporation | imported from 3GU |
R4‑1910130 | draftCR on test cases for handover in FR2 (section A.7.3.1) | Intel Corporation | imported from 3GU |
R4‑1910131 | Draft CR to TS38.133 on FR2 test setup for random access test (Section A.5.3.2.2, A.7.3.2.2) | Samsung | imported from 3GU |
R4‑1910132 | CR on SSB based RLM test cases for EN-DC FR1 (Section A.4.5.1) | MediaTek inc. | imported from 3GU |
R4‑1910133 | CR on SSB based RLM test cases for SA FR1 (Section A.6.5.1) | MediaTek inc. | imported from 3GU |
R4‑1910134 | DraftCR on SSB-based RLM test cases for EN-DC FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1910135 | DraftCR on SSB-based RLM test cases for NR standalone FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1910136 | TC update for CSI-based RLM SA in FR1 (A.6.5.1.5, A.6.5.1.6, A.6.5.1.7, A.6.5.1.8) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910137 | Update to CSI-RS RLM test cases for FR2 EN-DC (section A.5.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1910138 | Update to CSI-RS RLM test cases for FR2 SA (section A.7.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1910139 | Maintenance CR on RLM scheduling restriction EN-DC (section A.5.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1910140 | Maintenance CR on RLM scheduling restriction NR SA (section A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1910141 | Draft CR for interruptions in ENDC-FR2 (Section A.5.5.2) | Qualcomm Incorporated | imported from 3GU |
R4‑1910142 | Draft CR for interruptions in SA FR2 (Section A.7.5.2) | Qualcomm Incorporated | imported from 3GU |
R4‑1910143 | Draft CR for SCell activation test cases in EN-DC FR1 (Section A.4.5.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1910144 | Draft CR for SCell activation test cases in EN-DC FR2 (Section A.5.5.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1910145 | Update to test cases for SCell activation/deactivation in SA (section A.6.5.3 and A.7.5.3) | CATT | imported from 3GU |
R4‑1910146 | DraftCR on correcting SSB based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.1 and A.4.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910147 | DraftCR on correcting SSB based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.1 and A.5.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910148 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.3 and A.4.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910149 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.3 and A.5.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910150 | DraftCR on correcting SSB based BFD and link recovery tests for SA in FR1 (section A.6.5.5.1 and A.6.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910151 | DraftCR on correcting SSB based BFD and link recovery tests for SA in FR2 (section A.7.5.5.1 and A.7.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910152 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 (section A.6.5.5.3 and A.6.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910153 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 (section A.7.5.5.3 and A.7.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910154 | TC scheduling restriction during SSB based BFD and LR in FR2 in EN-DC and SA (A.5.5.5.5, A.7.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910155 | Updates to test cases for BWP switching in SA (section A.7.5.6.1) | CATT | imported from 3GU |
R4‑1910156 | Maintenance on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1910157 | Maintenance on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1910158 | Maintenance on the BWP switch test cases SA FR1 (section A.6.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1910159 | Maintenance on the BWP switch test cases SA FR2 (section A.7.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1910160 | draftCR on test cases for EN-DC inter-frequency measurement (section A.4.6.2, A.5.6.2) | Intel Corporation | imported from 3GU |
R4‑1910161 | CR for new SSB and SMTC configurations | Ericsson | imported from 3GU |
R4‑1910162 | draftCR on test cases for SA inter-frequency measurement (section A.6.6.2, A.7.6.2) | Intel Corporation | imported from 3GU |
R4‑1910163 | Editorial corrections to accuracy tests section A.4.7, A.5.7, A.6.7, A.7.7 | Ericsson | imported from 3GU |
R4‑1910164 | Addition of OTA parameters to SS-RSRP accuracy test in section A.5.7.1 | Ericsson | imported from 3GU |
R4‑1910165 | Addition of OTA parameters to SS-RSRP accuracy test in section A.7.7.1 | Ericsson | imported from 3GU |
R4‑1910166 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for EN-DC FR2 (section A.5.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1910167 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for SA FR2 (section A.7.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1910168 | Draft CR to TS38.133 on test cases for SSB RSRQ measuremet accuracy for FR2 (Section A.5.7.2.2, A.7.7.2.2) | Samsung | imported from 3GU |
R4‑1910169 | CR on TS38 133 for EN-DC SS-SINR tests with PSCell in FR2 (Section A.5.7.3) | MediaTek inc. | imported from 3GU |
R4‑1910170 | CR on TS38.133 for SA SS-SINR tests with PCell in FR2 (Section A.7.7.3) | MediaTek inc. | imported from 3GU |
R4‑1910171 | Draft CR for PSCell addition test case in EN-DC FR2 (Section A.5.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1910172 | Draft CR for MAC-CE based TCI state switch (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1910173 | Draft CR for RRC based TCI state switch (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1910174 | CR on TS38.133 E-UTRAN – NR inter-RAT measurements test case with FR1 target cell and FR2 target cell (Section A.8.5.2) | MediaTek inc. | imported from 3GU |
R4‑1910175 | Editorial correction to TS38.133 on Test Cases for RRC_IDLE, RRC_INACTIVE and RRC_CONNECTED state mobility (Section A.4.3, A.5.3, A.6.1, A.6.2, A.6.3, A.7.1, A.7.2, A.7.3, A.8.2 and A.8.3) | Samsung | imported from 3GU |
R4‑1910176 | LS on signalling measurement thresholds for validating the TA for PUR | Ericsson | imported from 3GU |
R4‑1910177 | CR for PSCell addition delay requirements (section 8.9.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910178 | CR to 36.133 on reporting criteria | ZTE | imported from 3GU |
R4‑1910179 | Reply LS on SFTD measurement | ZTE | imported from 3GU |
R4‑1910180 | Correction of exception cases in CSSF based requirements (section 9.1.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1910181 | CR on reselection criterion in idle mode Rel-15 (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910182 | CR to add QCL definition (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1910183 | Meeting minutes for EN-DC and 29 dBm UE ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1910184 | CR for 38.101-3: Correction of n5 combinations protection for B26 | Sprint Corporation | imported from 3GU |
R4‑1910185 | Feasibility of asynchronous operation of CA_n78-n79 MSD due to cross band isolation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1910186 | TP for TR 37 716-11-11 to correct DC_28_n8 to correct spurious emission table for DC_28_n8 | Ericsson | imported from 3GU |
R4‑1910187 | TP for TR 37.716-11-11 to include 7A_n3A | Ericsson, Swisscom | imported from 3GU |
R4‑1910188 | TP for TR37.716-11-11 for DC_1_n8 | ZTE Corporation, | imported from 3GU |
R4‑1910189 | TP for TR37.716-11-11 for DC_8_n39 | ZTE Corporation, | imported from 3GU |
R4‑1910190 | TP for TR 37.716-11-11: DC_8_n28 | SoftBank Corp. | imported from 3GU |
R4‑1910191 | TP for TR 37.716-21-21 to include DC_3-7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1910192 | TP for TR 37.716-21-21 to include DC_1-3-7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1910193 | TP for TR 37.716-21-21 to include DC_1-7-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1910194 | TP for TR 37.716-11-11: DL_40A_n1A_UL_40A_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1910195 | TP for TR 37.716-11-11 DL_2A_n38A_UL_2A_n38A | Huawei, HiSilicon | imported from 3GU |
R4‑1910196 | TP for TR 38.716-02-00: CA_n66-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1910197 | TP for TR 37.716-11-11: DC_13_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910198 | TP for TR 37.716-11-11: DC_5_n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1910199 | TP for TR 38.716-02-00: CA_n7-n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910200 | TP for TR 38.716-02-00 CA_n41-n66 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1910201 | TP for TR 38.716-01-01 to include CA_n5B | Ericsson, Verizon | imported from 3GU |
R4‑1910202 | TP to TR 36.716-04-01: UE requirements for CA_1A-3A-7A-46A to CA_1A-3A-7A-46E | CHTTL | imported from 3GU |
R4‑1910203 | TR 38.716-01-01 v0.6.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1910204 | TP for TR 38.716-01-01 for updated scope from RAN #84 | Ericsson | imported from 3GU |
R4‑1910205 | TP for TR 37.716-31-11 for updated scope from RAN #84 | Ericsson | imported from 3GU |
R4‑1910206 | CR to correct 7.3B.2.3.2 and 7.3B.2.3.4 for EN-DC DC_7_n77 and DC_7_n78 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1910207 | Rel-16 CR to 36.101 to correct typos | Ericsson | imported from 3GU |
R4‑1910208 | TP for TR 37.716-21-11: DC_2-13_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910209 | TP for TR 38.716-02-00: CA_n3-n257 | KDDI | imported from 3GU |
R4‑1910210 | TP for TR 38.716-02-00: CA_n28-n257 | KDDI | imported from 3GU |
R4‑1910211 | TP for TR 36.716-03-01: CA_2-7-29 | Huawei, HiSilicon | imported from 3GU |
R4‑1910212 | TP for TR 38.716-02-00: CA_n3-n77 | KDDI | imported from 3GU |
R4‑1910213 | TP for TR 36.716-03-02: CA_1-3-3-8, CA_1-7-8 and CA_1-7-7-8 xDL/2UL | CHTTL | imported from 3GU |
R4‑1910214 | Correction to B70 UE Co-existence | Dish Network | imported from 3GU |
R4‑1910215 | Update NS_40 into TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1910216 | Update NS_40 into TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1910217 | Update NS_42 into TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1910218 | Update NS_42 into TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1910219 | CR for Narrowband blocking for LTE CatM1/M2 | Qualcomm Inc | imported from 3GU |
R4‑1910220 | [Draft] Reply LS on Aero UEs in band 3 and protection of meteorological satellite below 1710 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑1910221 | CR for 36.101: adding spurious emission band UE co-existence for CA_1-41 | Huawei, HiSilicon | imported from 3GU |
R4‑1910222 | TP for TR 36.716-04-01: CA_2A-7A-29A-66A, CA_2A-7C-29A-66A, CA_2A-7A-7A-29A-66A | Skyworks | imported from 3GU |
R4‑1910223 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910224 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910225 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910226 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910227 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910228 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson, Telecom Italia | imported from 3GU |
R4‑1910229 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson, Telecom Italia | imported from 3GU |
R4‑1910230 | CR of adding LTE B7 for UE category NB1 in R16 | Ericsson, Telecom Italia | imported from 3GU |
R4‑1910231 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson, Telecom Italia | imported from 3GU |
R4‑1910232 | CR of adding LTE B7 for UE category NB1 in R16 | Ericsson, Telecom Italia | imported from 3GU |
R4‑1910233 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT M1/M2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910234 | CR of adding LTE B7 for UE category NB1/NB2 in R16 | Ericsson, Telecom Italia | imported from 3GU |
R4‑1910235 | Draft CR to TS38.101-2 for Rx RF requirements | LG Electronics Finland | imported from 3GU |
R4‑1910236 | Draft CR of modification on reference to MIMO and BC requirements for inter-band EN-DC with FR2 for TS 38.101-3 | NTT DOCOMO INC. | imported from 3GU |
R4‑1910237 | CR for NR non-contiguous CA configuration | Verizon, Nokia, Ericsson, Qualcomm | imported from 3GU |
R4‑1910238 | CR for Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | Apple | imported from 3GU |
R4‑1910239 | LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 | Apple | imported from 3GU |
R4‑1910240 | Adding DeltaFHD for CA_n1-n77 refersense requirments | vivo | imported from 3GU |
R4‑1910241 | Draft CR to TS 38.101-2 on NR CA configurations for FR2 | ZTE Corporation | imported from 3GU |
R4‑1910242 | Draft CR for TS 38.101-3: Corrections to reference sensitivity exceptions due to receiver harmonic mixing for EN-DC in NR FR1 | MediaTek Inc. | imported from 3GU |
R4‑1910243 | CR to TS 38.101-3 correction for the UL RB allocations of the MSD table | CHTTL, Skyworks Solutions Inc., MediaTek Inc. | imported from 3GU |
R4‑1910244 | LS on xxxe | Qualcomm Incorporated | imported from 3GU |
R4‑1910245 | draft CR to correct protected band of band26 related EN-DC | KDDI Corporation | imported from 3GU |
R4‑1910246 | Draft CR to add simultaneous RX/TX capability requirements in R15 TS 38.101-3 | CMCC | imported from 3GU |
R4‑1910247 | Draft CR to add simultaneous RX/TX capability requirements in R15 TS 38.101-1 | CMCC | imported from 3GU |
R4‑1910248 | Draft CR to TS 38.101-3 for DC_38_n78 mandatory simultaneous Rx/Tx capability | Vodafone España SA | imported from 3GU |
R4‑1910249 | Draft CR for handling of EN-DC BCS for TS 38.101-3 | NTT DOCOMO INC. | imported from 3GU |
R4‑1910250 | draftCR to 38.101-3 for missing IMD MSD for shared bands that already have MSD | Qualcomm Incorporated | imported from 3GU |
R4‑1910251 | Draft CR for 38.101-3 non-contiguous resource allocation | Huawei, HiSilicon | imported from 3GU |
R4‑1910252 | WF on EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1910253 | draftCR to 38.101-1 NS_43 AMPR MPR threshold change and AMPR reduction | Qualcomm Incorporated | imported from 3GU |
R4‑1910254 | Draft CR for 38.101-1 Pcmax for inter band CA | Huawei, HiSilicon | imported from 3GU |
R4‑1910255 | Draft Minor Corrections to 38.101-3 clause 6.2B.4.1.1 | Motorola Mobility España SA | imported from 3GU |
R4‑1910256 | draft CR for 38.101-3:specifying occupied bandwidth for intra-band non-contiguous ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1910257 | Draft CR to TS38.101-3_OBW and transmit intermodulation for intra-band EN-DC | ZTE Corporation, | imported from 3GU |
R4‑1910258 | Ad-Hoc Meeting Minutes, Rel. 15 Beam Correspondence | Qualcomm | imported from 3GU |
R4‑1910259 | dCR to 38.101-2: Reference signal clarifications | Qualcomm Incorporated | imported from 3GU |
R4‑1910260 | dCR to 38.101-1: Reference signal clarifications | Qualcomm Incorporated | imported from 3GU |
R4‑1910261 | dCR to 38.101-2: FR2 AMPR updates, including ERC 74-01 changes | Qualcomm Incorporated | imported from 3GU |
R4‑1910262 | LS on FR2 Pmax | Huawei, HiSilicon | imported from 3GU |
R4‑1910263 | TP for TR 38.716-02-00: CA_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1910264 | TP for TR 37.716-11-11: MSD and self-interference analyses for DC_3A_n38A | MediaTek Inc. | imported from 3GU |
R4‑1910265 | CR of adding LTE B42/B43 for UE category NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910266 | CR to correct 7.3B.2.3.2 and 7.3B.2.3.4 for EN-DC DC_7_n77 and DC_7_n78 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1910267 | TP for TR 37.716-11-11: DC_7_n66 and DC_7-7_n66 | Samsung, Bell Mobility, TELUS,Nokia | imported from 3GU |
R4‑1910268 | Draft CR for TS 38.101-3: Corrections to reference sensitivity exceptions due to receiver harmonic mixing for EN-DC in NR FR1 | MediaTek Inc. | imported from 3GU |
R4‑1910269 | Analysis assumption for NR CA_n78-n79 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1910270 | Finalizing Generic Intra-band Contiguous CA Class B requirements | Dish Network | imported from 3GU |
R4‑1910271 | CR to 38.101-1. Revamp CA ACS and IBB tables to differentiate by band numbers and not frequency. | Qualcomm Incorporated | imported from 3GU |
R4‑1910272 | CR for 38.101-1 Rx requirement for NR intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1910273 | WF for intra-band UL CA for FR1 power class 3 | Huawei, HiSilicon | imported from 3GU |
R4‑1910274 | CR for 38.101-3 Pcmax for EN-DC with 3CC uplink | Huawei, HiSilicon | imported from 3GU |
R4‑1910275 | Updated TR 37.716-11-11_V0.6.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1910276 | Minutes for Ad-hoc for Rel16 FR2 WI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910277 | WF on EN-DC HPUE FDD+TDD | China Unicom | imported from 3GU |
R4‑1910278 | Mitigating Radio Link Failures due to MPE on FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910279 | LS on enhanced FR2 MPE mitigation solutions for avoiding radio link failures and connection releases in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910280 | WF on Inner RB Allocations Region 1 Extension For Power Class 3 Operation in FR2 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1910281 | TR skeleton for REL-16 UE RF WI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910282 | WF on Intra-band non-contiguous ULCA general requirements and MPR for FR2 | Qualcomm, Nokia, Intel, Apple, Huawei | imported from 3GU |
R4‑1910283 | WF on FR2 Inter-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑1910284 | CR for 36.101 Pcmax for V2X_v14 | Huawei, HiSilicon | imported from 3GU |
R4‑1910285 | CR for 36.101 Pcmax for V2X _v15 | Huawei, HiSilicon | imported from 3GU |
R4‑1910286 | CR for 36.101 Pcmax for V2X_v16 | Huawei, HiSilicon | imported from 3GU |
R4‑1910287 | dCR to 38.101-2: FR2 CA MPR refinement | Qualcomm Incorporated | imported from 3GU |
R4‑1910288 | Void | void | imported from 3GU |
R4‑1910289 | Draft CR for 38.101-1: Correction to the Spurious Emission for UE Coexistence table | Sprint Corporation, Ericsson, Google | imported from 3GU |
R4‑1910290 | CR for 38.101-1: Correction to the Spurious Emission for UE Coexistence table for n14 | Sprint | imported from 3GU |
R4‑1910291 | CR for 38.101-1: Correction to the Spurious Emission for UE Coexistence table for n30 | Sprint | imported from 3GU |
R4‑1910292 | Correction on EN-DC grouping in Rel-16 spec | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910293 | Minor corrections of intra-band non-contiguous CA operating bands in TS 38.101-1 | vivo | imported from 3GU |
R4‑1910294 | Minor corrections of intra-band non-contiguous CA operating bands in TS 38.101-2 | vivo | imported from 3GU |
R4‑1910295 | Correction on EN-DC grouping in Rel-16 spec | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910296 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1910297 | Rel-16 CR for further simplification of 38.101-2 Table 5.5A.2-2 | Ericsson | imported from 3GU |
R4‑1910298 | TP for 38.716-01-01 CA_n25(2A) REFSENS | Sprint Corporation | imported from 3GU |
R4‑1910299 | TP for TR 38.716-02-00: CA_n48_n66 | Samsung,Verizon | imported from 3GU |
R4‑1910300 | Correction Inter-band CA configurations | Dish Network | imported from 3GU |
R4‑1910301 | CR_38.101-3 Rel 16 Addition of footnote 3 to DC_40A_n41A | Skyworks Solutions Inc. | imported from 3GU |
R4‑1910302 | [SUL] CR on SUL band combinations into Rel-16 TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1910303 | Revised WID on Rel-16 NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1910304 | summary of template for Band combination request | CATT | imported from 3GU |
R4‑1910305 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1910306 | WF on B41/n41 29 dBm Power Class and EN-DC A-MPR Improvement | Sprint Corporation, Qorvo, Skyworks | imported from 3GU |
R4‑1910307 | Revised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1910308 | CR on introducing NR intra-band CA for 3DL Bands and 1UL band for 38.101-3 | CATT | imported from 3GU |
R4‑1910309 | CR of adding LTE B42/B43 for UE category NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1910310 | CR for 36.101: adding spurious emission band UE co-existence for CA_1-41 | Huawei, HiSilicon | imported from 3GU |
R4‑1910311 | Reply LS on Aero UEs in band 3 and protection of meteorological satellite below 1710 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑1910312 | WF on Transient period capability | Qualcomm Inc | imported from 3GU |
R4‑1910313 | Minutes for Transient period capability | Qualcomm Inc | imported from 3GU |
R4‑1910314 | Characteristics of Interfering signal for Contiguous Intra-band CA Class B | Dish Network | imported from 3GU |
R4‑1910315 | CR for NR non-contiguous CA configuration | Verizon, Nokia, Ericsson, Qualcomm | imported from 3GU |
R4‑1910316 | WF on how to enable TX diversity type Ues | Qualcomm Incorporated | imported from 3GU |
R4‑1910317 | Draft CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | MediaTek Inc. | imported from 3GU |
R4‑1910318 | Draft CR for 38.101-3 EN-DC Pcmax clear | Huawei, HiSilicon | imported from 3GU |
R4‑1910319 | CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1910320 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1910321 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1910322 | Big CR for EN-DC of LTE 1band + NR 1band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1910323 | CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1910324 | CR to introduce new combinations of LTE 4band + NR 1band for TS 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910325 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1910326 | Draft CR: REFSENS for SDL bands | Qualcomm, Dish network | imported from 3GU |
R4‑1910327 | Draft CR to TS 38.101-1: Corrections for DL RMC for FR1 tests | Intel Corporation | imported from 3GU |
R4‑1910328 | Draft CR to TS 38.101-2: Corrections for UL and DL RMC for FR2 tests | Intel Corporation | imported from 3GU |
R4‑1910329 | Ad-Hoc Meeting Minutes, Rel. 15 Beam Correspondence 1 | Qualcomm | imported from 3GU |
R4‑1910330 | dCR to 38.101-1: Reference signal clarifications | Qualcomm Incorporated | imported from 3GU |
R4‑1910331 | Void | void | imported from 3GU |
R4‑1910332 | Way Forward on Dynamic Power share testing | Qualcomm Incorporated | imported from 3GU |
R4‑1910333 | Draft CR for 38.101-2 reference measurement channel for beam correspondence | Huawei, HiSilicon | imported from 3GU |
R4‑1910334 | Draft CR for TS38.101-2, Editorial corrections | CATT | imported from 3GU |
R4‑1910335 | WF on EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1910336 | CR for 38.101-1 Rx requirement for NR intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1910337 | WF on FR2 Inter-band CA | Qualcomm Incorporated, Apple Inc. | imported from 3GU |
R4‑1910338 | WF on EN-DC HPUE FDD+TDD | China Unicom | imported from 3GU |
R4‑1910339 | Revised WID on Rel-16 NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1910340 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1910341 | Way Forward on Dynamic Power share testing | Qualcomm Incorporated | imported from 3GU |
R4‑1910342 | WF on Transient period capability | Qualcomm Inc | imported from 3GU |
R4‑1910343 | WF on how to enable TX diversity type Ues | Qualcomm Incorporated | imported from 3GU |
R4‑1910344 | LS on the testability of FR1 Tx diversity | Rohde-schwarz | imported from 3GU |
R4‑1910345 | Correction to Band n66 | Dish Network | imported from 3GU |
R4‑1910346 | Void | void | imported from 3GU |
R4‑1910347 | Void | void | imported from 3GU |
R4‑1910348 | Void | void | imported from 3GU |
R4‑1910349 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1910350 | CR to TS 38.101-1: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Qualcomm Incorporated | imported from 3GU |
R4‑1910351 | CR to TS 38.101-1: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Qualcomm Incorporated | imported from 3GU |
R4‑1910352 | CR to TS 38.101-2: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Qualcomm Incorporated | imported from 3GU |
R4‑1910353 | CR to TS 38.101-2: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Qualcomm Incorporated | imported from 3GU |
R4‑1910354 | CR to TS 38.101-3: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Qualcomm Incorporated | imported from 3GU |
R4‑1910355 | CR to TS 38.101-3: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Qualcomm Incorporated | imported from 3GU |
R4‑1910356 | CR to TS 38.133: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Intel Corporation | imported from 3GU |
R4‑1910357 | CR to TS 38.133: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Intel Corporation | imported from 3GU |
R4‑1910358 | CR to TS 38.101-4: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Samsung | imported from 3GU |
R4‑1910359 | CR to TS 38.141-1: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Huawei | imported from 3GU |
R4‑1910360 | CR to TS 38.141-1: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Huawei | imported from 3GU |
R4‑1910361 | CR to TS 38.141-2: Implementation of endorsed draft CRs from RAN4#92 (Rel-15) | Huawei | imported from 3GU |
R4‑1910362 | CR to TS 38.141-2: Implementation of endorsed draft CRs from RAN4#92 (Rel-16) | Huawei | imported from 3GU |
R4‑1910363 | CR on introduction of completed EN-DC of x bands LTE and 2 band NR from RAN4#92 into TS 38.101-3 | LG Electronics France | imported from 3GU |
R4‑1910364 | Void | void | imported from 3GU |
R4‑1910365 | Void | void | imported from 3GU |
R4‑1910366 | Void | void | imported from 3GU |
R4‑1910367 | Void | void | imported from 3GU |
R4‑1910368 | Void | void | imported from 3GU |
R4‑1910369 | Void | void | imported from 3GU |
R4‑1910370 | Void | void | imported from 3GU |
R4‑1910371 | Void | void | imported from 3GU |
R4‑1910372 | Void | void | imported from 3GU |
R4‑1910373 | Void | void | imported from 3GU |
R4‑1910374 | Void | void | imported from 3GU |
R4‑1910375 | Void | void | imported from 3GU |
R4‑1910376 | Void | void | imported from 3GU |
R4‑1910377 | Void | void | imported from 3GU |
R4‑1910378 | Void | void | imported from 3GU |
R4‑1910379 | Void | void | imported from 3GU |
R4‑1910380 | Void | void | imported from 3GU |
R4‑1910381 | Void | void | imported from 3GU |
R4‑1910382 | Void | void | imported from 3GU |
R4‑1910383 | Reply LS on 5G-NR FR2 Transmitter & Receiver Testability Issues | ARIB | imported from 3GU |
R4‑1910384 | REL-16 TS 38.307 addition of Annexes for UE RF requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910385 | WF on switching period between two FR1 carries | China Telecom | imported from 3GU |
R4‑1910386 | WF on NR-U 6 GHz band plan | Qualcomm Incorporated | imported from 3GU |
R4‑1910387 | WF on NR-U emission requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910388 | WF on spectrum utilization for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910389 | Perforamnce difference between different SSB location | Qualcomm Incorporated | imported from 3GU |
R4‑1910390 | WF for NR-U BS RF requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910391 | CR to TR 38.828 - abbreviations clean up | Huawei | imported from 3GU |
R4‑1910392 | CR to TR 38.828 - references clean up | Huawei | imported from 3GU |
R4‑1910393 | TP for band and bandwidth for NR V2X | CATT | imported from 3GU |
R4‑1910394 | draft CR to TR 38.810 on side condition of beam correspondence | Samsung | imported from 3GU |
R4‑1910395 | Draft CR for TR38.810: Integrating re-positioning concept into test procedures | Keysight Technologies UK Ltd, Apple Inc. | imported from 3GU |
R4‑1910396 | TP to TR 38.827 v0.3.0 on DUT positioning guidelines | ROHDE & SCHWARZ, Keysight | imported from 3GU |
R4‑1910397 | TP to TR 38.827 v0.3.0 on environmental requirements | OPPO | imported from 3GU |
R4‑1910398 | TP to TR 38.827 v0.3.0 on averaging of throughput curves | OPPO | imported from 3GU |
R4‑1910399 | TP to 38.827 on Channel Models | Keysight Technologies UK Ltd, Spirent Communications | imported from 3GU |
R4‑1910400 | TP on adjacent channel co-existence scenarios and parameters for NR V2X service on FR1 | LG Electronics Finland | imported from 3GU |
R4‑1910401 | [V2X] link level simulation assumption on sidelink PSSCH for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1910402 | Initial coexistence simulation results of NR V2X for ITS band | LG Electronics Finland | imported from 3GU |
R4‑1910403 | WF for UE RF requirements for NR V2X | LGE, Qualcomm, Vodafone, CATT, Huawei | imported from 3GU |
R4‑1910404 | Skeleton of Rel-16 IAB RAN4 Spec | Qualcomm | imported from 3GU |
R4‑1910405 | WF for conducted requiremens for IAB nodes | CMCC | imported from 3GU |
R4‑1910406 | WF on terminologies for IAB | Samsung | imported from 3GU |
R4‑1910407 | LS on switching and interruption time for MIMO layer adaption | CATT | imported from 3GU |
R4‑1910408 | CR to TR 38.817-01 on FR1 inner RB allocation range | Samsung | imported from 3GU |
R4‑1910409 | CR to TR 38.817-01 on FR1 inner RB allocation range | Samsung | imported from 3GU |
R4‑1910410 | CR to TS 37.104: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1910411 | CR to TS 37.141: CA channel spacing | ZTE Corporation | imported from 3GU |
R4‑1910412 | Draft CR for 38.101-2 correction for channel raster | Huawei, HiSilicon | imported from 3GU |
R4‑1910413 | Draft CR for 38.101-1 correction for channel raster | Huawei, HiSilicon | imported from 3GU |
R4‑1910414 | Draft CR for TS 38.101-1 SUL configured power correction | InterDigital Communications | imported from 3GU |
R4‑1910415 | Ad-hoc meeting minute for BS conformance testing | Huawei | imported from 3GU |
R4‑1910416 | CR to TS 37.145-1 with editorial corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910417 | CR to TS 37.104 TX&RX spurious emission range subclause 6.6.1.1&7.6.1 | ZTE Corporation | imported from 3GU |
R4‑1910418 | CR to TS 37.141 TX&RX spurious emission range subclause 6.6.1.5.1&7.6.5.1 | ZTE Corporation | imported from 3GU |
R4‑1910419 | CR to TS37.104: removal of Tx diversity for NR (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1910420 | CR to TS37.141: removal of Tx diversity for NR (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1910421 | CR to TS37.104 Corrections on NBB requirement (section 7.4.2) | ZTE Corporation | imported from 3GU |
R4‑1910422 | CR to TS37.141 Corrections on NBB requirement (section 7.4) | ZTE Corporation | imported from 3GU |
R4‑1910423 | Draft CR to TS 38.141-2: Clarification on OTA receiver requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910424 | Draft CR to TS 38.141-1 with clarification for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910425 | Draft CR to TS 38.141-2 with clarification for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910426 | Draft CR to TS 38.141-2: Correction in test procedure for OTA transmitter spurious emissions | Ericsson | imported from 3GU |
R4‑1910427 | Draft CR to TS 38.141-1: Editorial corrections | Ericsson | imported from 3GU |
R4‑1910428 | Draft CR to TS 38.141-1: Clarification on BS output power testing | Ericsson | imported from 3GU |
R4‑1910429 | Corrections to EVM 38.141-1 Annex H | Futurewei | imported from 3GU |
R4‑1910430 | Corrections to EVM 38.141-2 Annex L | Futurewei | imported from 3GU |
R4‑1910431 | Corrections to EVM calculations in 38.141-1 annex B | Futurewei | imported from 3GU |
R4‑1910432 | Test model corrections in TS38.141-1 clause 4.9 | Futurewei | imported from 3GU |
R4‑1910433 | Test model corrections in TS38.141-2 clause 4.9 | Futurewei | imported from 3GU |
R4‑1910434 | CR to TR 37.843: Addition of 2D Compact Range. MU, calibration and test procedure for EIRP and EIS. | ROHDE & SCHWARZ, MVG, CAICT | imported from 3GU |
R4‑1910435 | Draft CR to TS 38.141-2: Improvement of requirement overview tables in subclause 4.1.1 | Ericsson | imported from 3GU |
R4‑1910436 | Draft CR for TS38.141-2: Correction on test procedure for EIRP measurement | CATT | imported from 3GU |
R4‑1910437 | Draft CR to TS 38.141-2: Improvement of Radiated transmit power in subclause 6.2 and Annex B | Ericsson | imported from 3GU |
R4‑1910438 | Draft CR to TS 38.141-2: Additional information about alignment for TRP measurement in Annex I.1 | Ericsson | imported from 3GU |
R4‑1910439 | draft CR to TS 38.141-2 – clarify measurement directions test procedures | Huawei | imported from 3GU |
R4‑1910440 | draft CR to TS 38.141-2 – clean up reverberation chamber spurious emissions procedure | Huawei | imported from 3GU |
R4‑1910441 | Draft CR to TS 38.141-2 – single polarisation measurement procedure | Huawei | imported from 3GU |
R4‑1910442 | CR to TS 37.145-2 – single polarisation measurement procedure | Huawei | imported from 3GU |
R4‑1910443 | Draft CR to TS 38.141-2: Improvements of OTA out-of-band blocking in subclause 7.6 | Ericsson | imported from 3GU |
R4‑1910444 | draft CR to TS 38.141-2 – reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1910445 | CR to 38.817-02 - correct TX OFF MU table | Huawei | imported from 3GU |
R4‑1910446 | draft CR to 38.141-2 - Improvements to annex I | Huawei | imported from 3GU |
R4‑1910447 | Draft CR to TS 38.141-2: Improvements of description of measuring noise close to the noise floor in Annex K | Ericsson | imported from 3GU |
R4‑1910448 | Draft CR to TS 38.141-1: Clarifications on receive configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910449 | CR to TS 37.145-2 with addition of reference to data content for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910450 | Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1910451 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1910452 | Clarification of test directions declarations | Ericsson | imported from 3GU |
R4‑1910453 | CR to TS 37.145-2 – clarify measurement directions test procedures | Huawei | imported from 3GU |
R4‑1910454 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1910455 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1910456 | CR to TR 37.843: Improvement of error contribution decsription for RC in Annex E.5 | Ericsson | imported from 3GU |
R4‑1910457 | CR to TR 37.843: Improvement of RC technical background in clause 2 and subclause 10.5.2.3A | Ericsson | imported from 3GU |
R4‑1910458 | CR to TS 37.145-2: Additional information about alignment for TRP measurement in Annex F.1 | Ericsson | imported from 3GU |
R4‑1910459 | CR to TS 37.145-2 – Improvements to Annex F | Huawei | imported from 3GU |
R4‑1910460 | CR to TS 37.145-2 – clean up reverberation chamber spurious emissions procedure | Huawei | imported from 3GU |
R4‑1910461 | CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1910462 | Draft CR to 38.104: Correction on regional requirements (4.5) | NEC | imported from 3GU |
R4‑1910463 | Draft CR to 38.141-1: Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1910464 | Draft CR to 38.141-2: Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1910465 | CR to TR 38.817-02: Background on the EVM | ZTE Corporation | imported from 3GU |
R4‑1910466 | CR to TR 38.817-02 updating the FR2 TAE limits | Huawei, HiSilicon | imported from 3GU |
R4‑1910467 | CR to 38.817-02 - derivation of FR2 out of band blocking limits | Huawei | imported from 3GU |
R4‑1910468 | Draft CR to 38.104 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1910469 | Draft CR to 38.141-2 on Receiver spurious emission requirements Category B | Ericsson | imported from 3GU |
R4‑1910470 | CR to 37.113 Editorial Corrections | Ericsson | imported from 3GU |
R4‑1910471 | CR to 37.114 Editorial Corrections | Ericsson | imported from 3GU |
R4‑1910472 | CR to 38.113 Editorial Corrections | Ericsson | imported from 3GU |
R4‑1910473 | WF on protection of UE simulator receiver during RI test | ZTE | imported from 3GU |
R4‑1910474 | CR to TS 37.113 Correction on CISPR 16-1-1 for DC conducted Emission(clause 7.1 and subclause 8.3.2 ) | ZTE Corporation | imported from 3GU |
R4‑1910475 | WF on IAB EMC aspects | ZTE Corporation, Ericsson | imported from 3GU |
R4‑1910476 | Introduction of requirements for NR + UTRA/GSM combinations | Ericsson, Nokia, Nokia Shanghai Bell, Vodafone | imported from 3GU |
R4‑1910477 | TR skeleton for TR 38.883: Study on support of NR downlink 256 Quadrature Amplitude Modulation (QAM) for frequency range 2 (FR2) | China Telecom | imported from 3GU |
R4‑1910478 | TR skeleton for TR 38.883: Study on support of NR downlink 256 Quadrature Amplitude Modulation (QAM) for frequency range 2 (FR2) | China Telecom | imported from 3GU |
R4‑1910479 | TP for TR 38.883: System level simulation results for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1910480 | TP for TR 38.883: Link level simulation results for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1910481 | TP for TR 37.832: Testability applicability | Ericsson | imported from 3GU |
R4‑1910482 | TP to the new TR related to MTC: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1910483 | TP for Simultaneously operation with LTE_MTC and NR | Ericsson | imported from 3GU |
R4‑1910484 | TR 37.823 LTE-M coexisting with NR v 0.1.0 | Ericsson | imported from 3GU |
R4‑1910485 | TP for TR 37.823: LTE-MTC in-band deployment configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910486 | Proposals on definitions of in-band, guard band and stand-alone operations when NB-IoT is located within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910487 | TP on NB-IoT operating in NR guard band | Huawei, HiSilicon, CHTTL | imported from 3GU |
R4‑1910488 | TP on system scenarios for NB-IoT co-existence with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1910489 | TP on specification and conformance impact | Huawei, HiSilicon | imported from 3GU |
R4‑1910490 | Draft CR to TS38.141-1: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1910491 | Draft CR to TS38.141-2: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1910492 | Discussion on synchronized operation definition in BS specifications | CMCC | imported from 3GU |
R4‑1910493 | Draft CR to TS 38.104 correction to Annex C.7 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910494 | CR to TS 37.145-2: Removal of BS type 2-O in radiated performance requirements for NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910495 | CR to TS 37.105: Correction on operation band unwanted emission | ZTE Corporation | imported from 3GU |
R4‑1910496 | CR to TS 37.145-1: Correction on multi-band test configurations | ZTE Corporation | imported from 3GU |
R4‑1910497 | CR to TS37.145-1: Corrections on ICS requirement (Section 7.8.5) | ZTE Corporation | imported from 3GU |
R4‑1910498 | CR to TS37.145-2: Corrections on ICS requirement (Section 7.9.5) | ZTE Corporation | imported from 3GU |
R4‑1910499 | TP to 38.820 on the regulatory overview of 7-24 GHz for ITU Regions 1 and 2 | Apple Inc., Ericsson | imported from 3GU |
R4‑1910500 | TP to TR 38.820: Frequency range characteristics | Ericsson | imported from 3GU |
R4‑1910501 | TP to TR38.820: system parameters | ZTE Corporation | imported from 3GU |
R4‑1910502 | Further analysis of the deployment scenarios for 7-24 GHz frequency range | Huawei | imported from 3GU |
R4‑1910503 | TP to TR 38.820: UE RF technology considerations in the 7-24 GHz range | LG Electronics, Skyworks Solutions Inc, Sony, Apple Inc., Qualcomm, Ericsson | imported from 3GU |
R4‑1910504 | TP to TR 38.820: Updates on the PA trends | Huawei | imported from 3GU |
R4‑1910505 | TP to TR 38.820: Addition of BS PA trends conclusion in subclause 5.4.1 | Ericsson | imported from 3GU |
R4‑1910506 | TP to TR 38.820: PA power scaling and AAS dependencies in subclause 5.4.2 | Ericsson | imported from 3GU |
R4‑1910507 | TP to TR 38.820: Filtering aspects for different example frequencies in subclause 5.4.5 | Ericsson | imported from 3GU |
R4‑1910508 | TP to TR 38.820: Signal quality considerations for 7-24 GHz base station operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910509 | TP to TR 38.820: Update of BS noise figure over the 7-24 GHz range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910510 | Addition of new channel bandwidths for n7 into TS 38.101-1 | Nokia | imported from 3GU |
R4‑1910511 | WF on link budget parameters for Rx/Tx of band n259 | Huawei, Apple Inc. | imported from 3GU |
R4‑1910512 | A-MPR table for n38 40 MHz co-existence | Huawei, HiSilicon | imported from 3GU |
R4‑1910513 | CR for TS 38.101-1: adding wider channel bandwidths | Huawei, HiSilicon | imported from 3GU |
R4‑1910514 | n29 introduction to 38.101 | Dish Network | imported from 3GU |
R4‑1910515 | n29 introduction to 37.104 | Dish Network | imported from 3GU |
R4‑1910516 | n29 introduction to 37.141 | Dish Network | imported from 3GU |
R4‑1910517 | n29 introduction to 37.145-1 | Dish Network | imported from 3GU |
R4‑1910518 | n29 introduction to 37.145-2 | Dish Network | imported from 3GU |
R4‑1910519 | n29 introduction to 38.141-2 | Dish Network | imported from 3GU |
R4‑1910520 | CR on Protection of SUL bands to TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1910521 | CR on Protection of SUL band n89 to TS 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1910522 | LS reply on supported BW for initial BWP | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910523 | TP to TR 38.820, capture transmitter architecture discussion. | Huawei | imported from 3GU |
R4‑1910524 | TP to TR 38.820: Adding reference architecture for base station requirements sets in subclause 7.2 | Ericsson | imported from 3GU |
R4‑1910525 | TP to TR 38.820: Description of BS architectures and types | Ericsson | imported from 3GU |
R4‑1910526 | TP to TR 38.820: placeholder for the BS RF requirements summary | Huawei | imported from 3GU |
R4‑1910527 | TP to TR38.820 - co-location requirements | Huawei | imported from 3GU |
R4‑1910528 | TP to TR38.820 - co-existence emissions requirements | Huawei | imported from 3GU |
R4‑1910529 | TP to TR 7-24GHz OOB requirement | ZTE Corporation | imported from 3GU |
R4‑1910530 | Void | void | imported from 3GU |
R4‑1910531 | Ad-hoc minutes on switching period between two FR1 uplink carriers | China Telecom | imported from 3GU |
R4‑1910532 | Perforamnce difference between different SSB location | Qualcomm Incorporated | imported from 3GU |
R4‑1910533 | Ad-hoc Meeting minutes for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1910534 | Ad-hoc meeting minutes for NR V2X | LG | imported from 3GU |
R4‑1910535 | WF on NR-U emission requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910536 | WF on NR-U guard-band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910537 | WF on spectrum utilization for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910538 | TC update for CSI-based RLM EN-DC in FR1 (A.4.5.1.5, A.4.5.1.6, A.4.5.1.7, A.4.5.1.8) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910539 | DraftCR on correcting SSB based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.1 and A.4.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910540 | DraftCR on correcting SSB based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.1 and A.5.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910541 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.3 and A.4.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910542 | LS on sidelink BWP reconfiguration on ITS band | Mediatek | imported from 3GU |
R4‑1910543 | Draft CR for L1-RSRP performance test case in EN-DC FR2 (Section A.5.7.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1910544 | Draft CR for L1-RSRP performance test case in SA FR2 (Section A.7.7.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1910545 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.3 and A.5.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910546 | DraftCR on correcting SSB based BFD and link recovery tests for SA in FR1 (section A.6.5.5.1 and A.6.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910547 | DraftCR on correcting SSB based BFD and link recovery tests for SA in FR2 (section A.7.5.5.1 and A.7.5.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1910548 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 (section A.6.5.5.3 and A.6.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910549 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 (section A.7.5.5.3 and A.7.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1910550 | LS on RSSI measurement definition | MediaTek inc. | imported from 3GU |
R4‑1910551 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1910552 | CR: Demod test definition for HST in 500km/h speed | Qualcomm Incorporated | imported from 3GU |
R4‑1910553 | [draft] Reply LS on NR fast SCell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1910554 | Draft CR on Intra-band non-contiguous CA MRTD (Section 7.6.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1910555 | LS on RSSI measurement definition | MediaTek inc. | imported from 3GU |
R4‑1910556 | Draft CR for TR38.810: Update of RRM Baseline Setup | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1910557 | Reply LS to RAN5 to update 38.101-4 with Link Adaptation requirements | Qualcomm | imported from 3GU |
R4‑1910558 | CR to update inter-frequency SFTD measurement requirements (section 9.3.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1910559 | CR for Tx timing requirements for PUR transmission | Huawei, HiSilicon | imported from 3GU |
R4‑1910560 | DraftCR on Reporting Criteria in TS 38.133(section 9.1.4.2) | OPPO | imported from 3GU |
R4‑1910561 | On RAN4 work scope for NR positioning | Intel Corporation | imported from 3GU |
R4‑1910562 | Reply LS to RAN5 to update 38.101-4 with Link Adaptation requirements | Qualcomm | imported from 3GU |
R4‑1910563 | Updates to NR PDCCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1910564 | Clarification CR on BWP switch delay requirements (8.6) | MediaTek inc. | imported from 3GU |
R4‑1910565 | Clarification CR on BWP switch interruption requirements (8.2) | MediaTek inc. | imported from 3GU |
R4‑1910566 | CR on interruptions due to RRC based BWP switch for EN-DC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1910567 | CR on BWP switch interruptions for NE-DC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1910568 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1910569 | Way forward on RRM impact of the R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1910570 | Reply LS on reporting criteria limitation in MR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1910571 | Way forward on Performance requirements for intra-band contiguous CA with minimum channel spacing | Huawei, HiSilicon | imported from 3GU |
R4‑1910572 | Requirements for PSCell change in ENDC | Huawei, HiSilicon | imported from 3GU |
R4‑1910573 | LS on RSSI definition | MediaTek inc. | imported from 3GU |
R4‑1910574 | Reply LS on NR fast Scell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1910575 | LS on evaluation of S criteria on non-anchor carrier | Huawei | imported from 3GU |
R4‑1910576 | Way forward on RRM impact of the R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1910577 | Void | void | imported from 3GU |
R4‑1910578 | Void | void | imported from 3GU |
R4‑1910579 | Void | void | imported from 3GU |
R4‑1910580 | Void | void | imported from 3GU |
R4‑1910581 | Void | void | imported from 3GU |
R4‑1910582 | Void | void | imported from 3GU |
R4‑1910583 | Void | void | imported from 3GU |
R4‑1910584 | Void | void | imported from 3GU |
R4‑1910585 | Void | void | imported from 3GU |
R4‑1910586 | Void | void | imported from 3GU |
R4‑1910587 | Void | void | imported from 3GU |
R4‑1910588 | WF on channel raster | Ericsson | imported from 3GU |
R4‑1910589 | IAB Ad Hoc meeting minutes | Qualcomm | imported from 3GU |
R4‑1910590 | WF on switching and interruption for MIMO layer adaption | CATT | imported from 3GU |
R4‑1910591 | TP for TR 38.883: Simulation assumptions for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1910592 | Draft CR for TS 38.101-1 SUL configured power correction | InterDigital Communications | imported from 3GU |
R4‑1910593 | WF on channel raster | Ericsson | imported from 3GU |
R4‑1910594 | Corrections of the subclause mapping with 38.141-1 clause 4, annex C | Futurewei | imported from 3GU |
R4‑1910595 | Corrections of the subclause mapping with 38.141-2 clause 4, annex C | Futurewei | imported from 3GU |
R4‑1910596 | CR to TR 38.817-02: Background on the EVM | ZTE Corporation | imported from 3GU |
R4‑1910597 | Draft CR to TS 38.141-2: Corrections related to manufacturer declarations in subclause 4.6 | Ericsson | imported from 3GU |
R4‑1910598 | Correction to RX spurious emissions applicability range for SR E-UTRA BS | Ericsson | imported from 3GU |
R4‑1910599 | TP to TR 38.820: Frequency range characteristics | Ericsson | imported from 3GU |
R4‑1910600 | Further analysis of the deployment scenarios for 7-24 GHz frequency range | Huawei | imported from 3GU |
R4‑1910601 | TP to TR 38.820: Description of BS architectures and types | Ericsson | imported from 3GU |
R4‑1910602 | Draft CR for TS 38.101-1: Channel spacing for adjacent NR carriers | Huawei | imported from 3GU |
R4‑1910603 | Draft CR for TS 38.101-2: Channel spacing for adjacent NR carriers | ZTE | imported from 3GU |
R4‑1910604 | draft CR to TS38.101-1_Addition_of_a_new_note_on_UL_MIMO_for_SUL (section 5.2C) | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910605 | LS to RAN2 on mandatory 90 MHz UE channel bandwidth for n41 and n78 in REL-16 | Vodafone | imported from 3GU |
R4‑1910606 | Draft CR for TS 38.104: Channel spacing for adjacent NR carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1910607 | Minimum Range Length Requirements for DFF Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1910608 | Draft CR to TR38.810 on DFF rangelength definitaion | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1910609 | WF on NR MIMO OTA | CAICT | imported from 3GU |
R4‑1910610 | LS on SS-RSRPB definition | Huawei | imported from 3GU |
R4‑1910611 | CR to TR 38.810: Implementation of endorsed draft CRs from RAN4#92 | Intel | imported from 3GU |
R4‑1910612 | TP for TR 37.823: LTE-MTC in-band deployment configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910613 | WF on fixing references to internal 3x.8xx TRs in BS specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1910614 | Draft CR for TS 38.101-2: Channel spacing for adjacent NR carriers | ZTE | imported from 3GU |
R4‑1910615 | CR to 38.817-02 - correct TX OFF MU table | Huawei | imported from 3GU |
R4‑1910616 | CR to TR 38.817-02 updating the FR2 TAE limits | Huawei, HiSilicon | imported from 3GU |
R4‑1910617 | CR: Demod test definition for HST in 500km/h speed | Qualcomm Incorporated | imported from 3GU |
page generated from database: 2024-04-22 07:58:53