3GPP TDocs (written contributions) at meeting
Meeting: R2-107 - 2019-10-14 to 2019-10-18, Chongqing
meeting id: R2-107 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R2‑1912000 | Agenda for RAN2#107bis | Chairman | imported from 3GU |
R2‑1912001 | RAN2#107 Meeting Report | MCC | imported from 3GU |
R2‑1912002 | Reply LS on NAS Aspects of Mobile-terminated Early Data Transmission (C1-195111; contact: Qualcomm) | CT1 | imported from 3GU |
R2‑1912003 | LS on sending CAG ID during resume procedure (C1-195157; contact: Samsung) | CT1 | imported from 3GU |
R2‑1912004 | LS on short MAC-I and ngKSI for 5G-CIoT (C1-195199; contact: Vodafone) | CT1 | imported from 3GU |
R2‑1912005 | LS on encoding of UE radio capabilities (C3-193147; contact: Qualcomm) | CT3 | imported from 3GU |
R2‑1912006 | Liaison response on Ethernet header compression (liaison-response-3GPP-RAN2-Ethernet-header-compression-0719-v01; contact: Ericsson, Nokia) | GSMA | imported from 3GU |
R2‑1912007 | LS on O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs (ORAN_3GPP_Liaison_Statement_final; contact: AT&T, CMCC) | IEEE 802.3 | imported from 3GU |
R2‑1912008 | Reply LS on PDCCH monitoring for NR-DC (R1-1909550; contact: Samsung) | RAN1 | imported from 3GU |
R2‑1912009 | LS Reply on overall procedure for 2-step RACH (R1-1909554; contact: ZTE) | RAN1 | imported from 3GU |
R2‑1912010 | Reply LS on quality report in Msg3 for LTE-M (R1-1909793; contact: Ericsson) | RAN1 | imported from 3GU |
R2‑1912011 | LS on DL/UL Reference Signals and Measurements for NR Positioning (R1-1909796; contact: Intel) | RAN1 | imported from 3GU |
R2‑1912012 | Reply LS on SFTD measurement (R1-1909819; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1912013 | Reply LS on MAC CE design for SCell BFR (R1-1909833; contact: Apple) | RAN1 | imported from 3GU |
R2‑1912014 | Reply LS on Tx DC location (R1-1909849; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1912015 | Reply LS on transmission of short message with multiple beams (R1-1909852; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1912016 | Reply LS on RAN1/4 feature lists R1-1909856; contact: NTT DOCOMO) | RAN1 | imported from 3GU |
R2‑1912017 | LS on mapping between LTE V2X PPPP and NR V2X priority (R1-1909876; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1912018 | Reply LS on Sidelink HARQ Feedback for Groupcast (R1-1909879; contact: LGE) | RAN1 | imported from 3GU |
R2‑1912019 | LS on DL HARQ timing for FDD Scell for LTE TDD-FDD CA with TDD Pcell, applied to FDD Pcell, for Dual Uplink EN-DC (R1-1909875; contact: Vodafone) | RAN1 | imported from 3GU |
R2‑1912020 | LS on SFN sync (R1-1909882; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1912021 | Reply LS to RAN 2 on CSI reporting in C-DRX (R1-1909889; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1912022 | Reply LS on NR fast SCell activation (R1-1909893; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1912023 | Reply LS on maximum value of MDBV (R1-1909894; contact: Qualcomm) | RAN1 | imported from 3GU |
R2‑1912024 | LS on NR Rel-16 TEI (R1-1909895; contact: NTT DOCOMO) | RAN1 | imported from 3GU |
R2‑1912025 | Response to LS on Combination 2 of Uu QoS characteristics values for V2X services (R1- 1909898; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1912026 | Reply LS on supported BW for initial BWP (R1-1909900; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1912027 | Reply LS on propagation delay compensation for reference time information delivery (R1-1909906; contact: Nokia) | RAN1 | imported from 3GU |
R2‑1912028 | Reply LS on Combinations of Uu QoS characteristics values for V2X services (R3-193258; contact: Huawei) | RAN3 | imported from 3GU |
R2‑1912029 | Reply on radio resource management policy (R3-194550; contact: Huawei) | RAN3 | imported from 3GU |
R2‑1912030 | Reply LS on LS on maximum value of MDBV (R3-194553; contact: Qualcomm) | RAN3 | imported from 3GU |
R2‑1912031 | Reply LS on Data activity reporting (R3-194572; contact: Ericsson) | RAN3 | imported from 3GU |
R2‑1912032 | Reply LS on LTE-M identification in 5GC (R3-194748; contact: Qualcomm) | RAN3 | imported from 3GU |
R2‑1912033 | LS on full configuration during SN Modification procedure (R3-194758; contact: Huawei) | RAN3 | imported from 3GU |
R2‑1912034 | LS on enhanced Make-Before-Break data forwarding (R3-194768; contact: Ericsson) | RAN3 | imported from 3GU |
R2‑1912035 | Reply LS on RAN sharing and Emergency services with Non-Public Networks (R3-194785; contact: Qualcomm) | RAN3 | imported from 3GU |
R2‑1912036 | LS on clarifications on Private Networks (R3-194786; contact: Nokia) | RAN3 | imported from 3GU |
R2‑1912037 | LS on the IAB-indication to core network (R3-194787; contact: Qualcomm) | RAN3 | imported from 3GU |
R2‑1912038 | Reply LS on Enhancements to QoS Handling for V2X Communication Over Uu Reference Point (R3-194795; contact: Vodafone) | RAN3 | imported from 3GU |
R2‑1912039 | Reply LS on measurement gap for SRS-RSRP or CLI-RSSI measurements (R4-1908777; contact: LGE) | RAN4 | imported from 3GU |
R2‑1912040 | Reply LS on RAN1/4 feature lists (R4-1909845; contact: Intel) | RAN4 | imported from 3GU |
R2‑1912041 | Reply LS on simultaneous RX/TX for NR (R4-1909992; contact: Ericsson) | RAN4 | imported from 3GU |
R2‑1912042 | Reply LS on maximum allowed SCell activation delay for Rel16 CA (R4-1909995; contact: Nokia) | RAN4 | imported from 3GU |
R2‑1912043 | LS Reply on measurements for SRVCC from 5G to 3G (R4-1910026; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1912044 | Reply to LS on DL channel quality report for configured carrier in RRC connected mode (R4-1910110; contact: Qualcomm) | RAN4 | imported from 3GU |
R2‑1912045 | LS on signalling measurement thresholds for validating the TA for PUR (R4-1910176; contact: Ericsson) | RAN4 | imported from 3GU |
R2‑1912046 | Reply LS on SFTD measurement (R4-1910179; contact: ZTE) | RAN4 | imported from 3GU |
R2‑1912047 | LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 (R4-1910239; contact: Apple) | RAN4 | imported from 3GU |
R2‑1912048 | LS on FR2 Pmax (R4-1910262; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1912049 | LS reply on supported BW for initial BWP (R4-1910522; contact: Nokia) | RAN4 | imported from 3GU |
R2‑1912050 | LS on sidelink BWP reconfiguration on ITS band (R4-1910542; contact: MediaTek) | RAN4 | imported from 3GU |
R2‑1912051 | Reply LS on reporting criteria limitation in MR-DC (R4-1910570; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1912052 | LS on RSSI definition (R4-1910573; contact: MediaTek) | RAN4 | imported from 3GU |
R2‑1912053 | Reply LS on NR fast SCell activation (R4-1910574; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1912054 | LS on evaluation of S criteria on non-anchor carrier (R4-1910575; contact: Huawei) | RAN4 | imported from 3GU |
R2‑1912055 | LS to RAN2 on mandatory 90 MHz UE channel bandwidth for n41 and n78 in REL-16 (R4-1910605; contact: Vodafone) | RAN4 | imported from 3GU |
R2‑1912056 | LS on Rel-16 NB-IoT enhancements (RP-192338; contact: Futurewei) | RAN | imported from 3GU |
R2‑1912057 | Reply on Combinations of Uu QoS characteristics values for V2X services (S2 -1906340; contact: Huawei) | SA2 | imported from 3GU |
R2‑1912058 | Reply LS on Reply LS on Mobile-terminated Early Data Transmission (S3-193059; contact: Nokia) | SA3 | imported from 3GU |
R2‑1912059 | LS on Sending CAG ID in NAS layer (S3-193142; contact: Qualcomm) | SA3 | imported from 3GU |
R2‑1912060 | LS to RAN2 and RAN3 on False Base Station Detection (S3-193175; contact: Huawei) | SA3 | imported from 3GU |
R2‑1912061 | LS on QoE Measurement Collection (S5-195659; contact: Ericsson) | SA5 | imported from 3GU |
R2‑1912062 | Reply LS on L1 and L2 measurements (S5-195941; contact: Huawei) | SA5 | imported from 3GU |
R2‑1912063 | LS on aspects of Mission Critical Services over 5MBS (S6-192003; contact: AT&T) | SA6 | imported from 3GU |
R2‑1912064 | Reply LS to “O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs” (SP-190947; contact: Intel) | SA | imported from 3GU |
R2‑1912065 | Discussion on SL capability signaling for Uu-RRC | OPPO | imported from 3GU |
R2‑1912066 | Left issues on SIB and cell reselection for NR-V2X | OPPO | imported from 3GU |
R2‑1912067 | Discussion on SL-related Uu-RRC messages | OPPO | imported from 3GU |
R2‑1912068 | Discussion on RLC mode configuration collision | OPPO | imported from 3GU |
R2‑1912069 | Left issues on RLC, PDCP and SDAP for NR-V2X | OPPO | imported from 3GU |
R2‑1912070 | Left issues on MAC for NR-V2X | OPPO | imported from 3GU |
R2‑1912071 | Left issues on UL-SL prioritization for NR-V2X | OPPO | imported from 3GU |
R2‑1912072 | [DRAFT] LS on HARQ option for group-cast | OPPO | imported from 3GU |
R2‑1912073 | Left issues on PC5-RRC based AS layer configuration procedure | OPPO | imported from 3GU |
R2‑1912074 | Left issues on PC5-S impact on AS-layer | OPPO | imported from 3GU |
R2‑1912075 | Left issues on PC5-RRC based capability transfer procedure | OPPO | imported from 3GU |
R2‑1912076 | Left issues on SLRB configuration for NR-V2X | OPPO | imported from 3GU |
R2‑1912077 | Discussion on congestion control and admission control | OPPO | imported from 3GU |
R2‑1912078 | Miscellaneous issues on PC5-RRC | OPPO | imported from 3GU |
R2‑1912079 | Left issue on idle mode mobility for NTN | OPPO | imported from 3GU |
R2‑1912080 | Discussion on DL-TDOA positioning | ZTE Corporation | imported from 3GU |
R2‑1912081 | Discussion on UL-TDOA positioning in NR | ZTE Corporation | imported from 3GU |
R2‑1912082 | Discussion on multi-cell E-CID in NR | ZTE Corporation | imported from 3GU |
R2‑1912083 | Discussion on multi-cell E-CID in NR | ZTE Corporation | imported from 3GU |
R2‑1912084 | Remaining stage-2 open issues for 2-step RACH | OPPO | imported from 3GU |
R2‑1912085 | msgB MAC PDU format in 2-step RACH | OPPO | imported from 3GU |
R2‑1912086 | Configuration for 2-step RACH | OPPO | imported from 3GU |
R2‑1912087 | Stage3 issues on contention resolution for 2-step RACH | OPPO | imported from 3GU |
R2‑1912088 | Contention free 2-step RACH | OPPO | imported from 3GU |
R2‑1912089 | Remaining issues on configuration of power saving signalling | OPPO | imported from 3GU |
R2‑1912090 | Remaining issues on UE behaviours when WUS is configured | OPPO | imported from 3GU |
R2‑1912091 | Impacts of power saivng signalling on CSI reporting | OPPO | imported from 3GU |
R2‑1912092 | MIMO layer adaptation for power saving | OPPO | imported from 3GU |
R2‑1912093 | UE assistance information for power saving | OPPO | imported from 3GU |
R2‑1912094 | RRM relaxation for power saving | OPPO | imported from 3GU |
R2‑1912095 | Remaining issues on detecting uplink LBT failure for NR-U | OPPO | imported from 3GU |
R2‑1912096 | Uplink LBT failure revoery for NR-U | OPPO | imported from 3GU |
R2‑1912097 | Issues on contention resolution timer in NR-U | OPPO | imported from 3GU |
R2‑1912098 | Remaining issues on extending RA response window in NR-U | OPPO | imported from 3GU |
R2‑1912099 | [Draft] LS on supporting LBT type in RAR | OPPO | imported from 3GU |
R2‑1912100 | 2-step RACH for NR-U | OPPO | imported from 3GU |
R2‑1912101 | Remaining DRX issues for non-numerical K1 and HARQ feedback | OPPO | imported from 3GU |
R2‑1912102 | DRX procedure enhancements due to LBT impacts | OPPO | imported from 3GU |
R2‑1912103 | Remaining issues on NR-U configured grant | OPPO | imported from 3GU |
R2‑1912104 | Discussion RAN1 LS on supporting multiple frequency domain monitoring locations for a searchspace | OPPO | imported from 3GU |
R2‑1912105 | RLM enhancements | OPPO | imported from 3GU |
R2‑1912106 | System information enhancements for NR-U | OPPO | imported from 3GU |
R2‑1912107 | RAN2 work plan for UE Power Saving WI | CATT (rapporteur) | imported from 3GU |
R2‑1912108 | [107#65][NR/Power Saving] Running CR for 36.300 (CATT) | CATT (rapporteur) | imported from 3GU |
R2‑1912109 | Stage-3 aspects of PDCCH-WUS | CATT | imported from 3GU |
R2‑1912110 | Remaining issues on UE RRC state transition request | CATT | imported from 3GU |
R2‑1912111 | Maximum MIMO layers configuration in power saving | CATT | imported from 3GU |
R2‑1912112 | SCell-related assistance information | CATT | imported from 3GU |
R2‑1912113 | Considerations on the criterions of RRM meausrement relaxation | CATT | imported from 3GU |
R2‑1912114 | Available Cell Reselection Measurement Result Reporting | CATT | imported from 3GU |
R2‑1912115 | Remaining issues of early measurement configurations | CATT | imported from 3GU |
R2‑1912116 | Considerations on Direct SCell activation in DC/CA Scenarios | CATT | imported from 3GU |
R2‑1912117 | Temporary RS utilization for SCell and SpCell | CATT | imported from 3GU |
R2‑1912118 | SCG dormant state | CATT | imported from 3GU |
R2‑1912119 | Signalling enhancement for Inactive state | CATT | imported from 3GU |
R2‑1912120 | DCCA configuration during RRC resume procedure | CATT | imported from 3GU |
R2‑1912121 | Common Cell Configuration for Signaling Reduction in NR | CATT | imported from 3GU |
R2‑1912122 | Bearer type negotiation | CATT | imported from 3GU |
R2‑1912123 | Discussion on BAP Buffer | CATT | imported from 3GU |
R2‑1912124 | Pre-emptive BSR | CATT | imported from 3GU |
R2‑1912125 | Remaining issues with IAB Routing | CATT | imported from 3GU |
R2‑1912126 | Further Discussions on IAB BH RLF | CATT | imported from 3GU |
R2‑1912127 | Summary of the email discussion [106#43][IAB] Backhaul RLF | CATT | imported from 3GU |
R2‑1912128 | Discussion on multi-beam enhancements | CATT | imported from 3GU |
R2‑1912129 | Further Considerations on Capability Coordination for DAPS-RUDI | CATT | imported from 3GU |
R2‑1912130 | Remaining PDCP issues for DAPS | CATT | imported from 3GU |
R2‑1912131 | Further Considerations on CP of DAPS-RUDI | CATT | imported from 3GU |
R2‑1912132 | Discussion on the Working Assumption Related Issues | CATT | imported from 3GU |
R2‑1912133 | Conditional PScell Addition/Change | CATT | imported from 3GU |
R2‑1912134 | Further Discussion on Cell Evaluation for CHO Cell Selection | CATT | imported from 3GU |
R2‑1912135 | Coexistence of Simultaneous Connectivity and CHO | CATT | imported from 3GU |
R2‑1912136 | Discussion on Signaling Structure of CHO Configuration Message | CATT | imported from 3GU |
R2‑1912137 | UE Capability Issue for CHO | CATT | imported from 3GU |
R2‑1912138 | Corrections on the premises of HO to E-UTRA | CATT | imported from 3GU |
R2‑1912139 | Corrections on the premises of E-UTRA HO to NR | CATT | imported from 3GU |
R2‑1912140 | Correction on reestablishRLC | CATT | imported from 3GU |
R2‑1912141 | Corrections on CG-Config | CATT | imported from 3GU |
R2‑1912142 | Issues for Log MDT Configuration in DC Scenario | CATT | imported from 3GU |
R2‑1912143 | Detection and Reporting of Out-of-coverage | CATT | imported from 3GU |
R2‑1912144 | [Draft] LS on MDT Configuration of Event triggered Out-of-coverage | CATT | imported from 3GU |
R2‑1912145 | Clarification of UL Delay Measurement | CATT | imported from 3GU |
R2‑1912146 | Uncertainty of L2 Measurement Result Related to URLLC | CATT | imported from 3GU |
R2‑1912147 | Output of Email Discussion [107#45][NRSON] RACH and Mobility Robustness Optimisation Checking | CATT | imported from 3GU |
R2‑1912148 | [Draft] Reply LS on RACH Optimization and Mobility Robustness Optimization | CATT | imported from 3GU |
R2‑1912149 | RACH Report Optimization | CATT | imported from 3GU |
R2‑1912150 | Recording and Reporting of RACH Failure | CATT | imported from 3GU |
R2‑1912151 | Consideration on Successful HO Report | CATT | imported from 3GU |
R2‑1912152 | Mobility History and State in NR | CATT | imported from 3GU |
R2‑1912153 | Cell Selection and Reselection of NPN cell | CATT | imported from 3GU |
R2‑1912154 | Connection and Mobility Issue for UEs in Idle and Inactive Mode | CATT | imported from 3GU |
R2‑1912155 | Mobility Issue for LEO in NTN System | CATT | imported from 3GU |
R2‑1912156 | Cell Selection and Reselection Issue between NTN and TN System | CATT | imported from 3GU |
R2‑1912157 | Measurement Issues for NTN System | CATT | imported from 3GU |
R2‑1912158 | Paging Load in Two Sub-options of Fixed TA | CATT | imported from 3GU |
R2‑1912159 | Discussion on Random Access Procedure for NTN | CATT | imported from 3GU |
R2‑1912160 | Consideration on the SPS/CG for NTN | CATT | imported from 3GU |
R2‑1912161 | Discussion on unicast connection setup procedure | CATT | imported from 3GU |
R2‑1912162 | RLM / RLF procedure in NR V2X Sidelink | CATT | imported from 3GU |
R2‑1912163 | Resource (Re-) selection function in NR V2X Sidelink | CATT | imported from 3GU |
R2‑1912164 | 38 323 running CR | CATT | imported from 3GU |
R2‑1912165 | Remaining Issues on PDCP | CATT | imported from 3GU |
R2‑1912166 | Resource allocation mode configuration | CATT | imported from 3GU |
R2‑1912167 | Further discussion on LCP procedure | CATT | imported from 3GU |
R2‑1912168 | Leftover issues for sidelink configured grant | CATT | imported from 3GU |
R2‑1912169 | Prioritization between UL and SL for NR V2X | CATT | imported from 3GU |
R2‑1912170 | SLRB configurations handling during UE states transition | CATT | imported from 3GU |
R2‑1912171 | Configuration Procedure of the Bi-directional RLC AM SLRB | CATT | imported from 3GU |
R2‑1912172 | NR Uu controlling LTE sidelink SPS | CATT | imported from 3GU |
R2‑1912173 | Left Issues of BSR/SR | CATT | imported from 3GU |
R2‑1912174 | Admission Control for NR SL | CATT | imported from 3GU |
R2‑1912175 | Type 1 Sidelink Configured Grant Validity Time | CATT | imported from 3GU |
R2‑1912176 | Remaining Issues on RACH procedure in NR-U | vivo | imported from 3GU |
R2‑1912177 | Remaining issues on uplink LBT failure | vivo | imported from 3GU |
R2‑1912178 | Issue on the autonomous BWP switching in NR-U | vivo | imported from 3GU |
R2‑1912179 | LBT impacts on 2-step RACH | vivo | imported from 3GU |
R2‑1912180 | Consideration on the collision between dynamic grant and configured grant in NR-U | vivo | imported from 3GU |
R2‑1912181 | CAPC Restriction to Data Multiplexing for Configured Grant | vivo | imported from 3GU |
R2‑1912182 | Introducing More Transmission Opportunities for DL SPS in NR-U | vivo | imported from 3GU |
R2‑1912183 | On NR-U PHR Handling | vivo | imported from 3GU |
R2‑1912184 | Further discuession on the whitelist in NR-U | vivo | imported from 3GU |
R2‑1912185 | Enhancements of System Information in NR-U | vivo | imported from 3GU |
R2‑1912186 | Differentiation between 2-step and 4-step RACH | vivo | imported from 3GU |
R2‑1912187 | Remaining issue on contention resolution 2-step RACH | vivo | imported from 3GU |
R2‑1912188 | Remaining issue on fallback from 2-step to 4-step RACH | vivo | imported from 3GU |
R2‑1912189 | Resource Selection for 2-step RACH | vivo | imported from 3GU |
R2‑1912190 | Prioritized RA Parameters for 2-step RACH | vivo | imported from 3GU |
R2‑1912191 | Discussion on the contention free 2-step CFRA | vivo | imported from 3GU |
R2‑1912192 | Remaining issues of NR early measurements | Qualcomm Incorporated | imported from 3GU |
R2‑1912193 | CR to 38.331 on support of cross-carrier scheduling with different numerology | Qualcomm Incorporated, ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912194 | Further discussion on NR SCG resume procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1912195 | Discussion on fast SCell activation based on RAN1 / RAN4 reply LS | Qualcomm Incorporated, Verizon, Vodafone | imported from 3GU |
R2‑1912196 | Discussion on common SCell configuration | Qualcomm Incorporated | imported from 3GU |
R2‑1912197 | Introducing suspension of SCG | Qualcomm Incorporated | imported from 3GU |
R2‑1912198 | Remaining issues of Fast MCG Recovery | Qualcomm Incorporated | imported from 3GU |
R2‑1912199 | Discussion on RRC configured SCell state in resume procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1912200 | Discussion on procedures in RAT-Dependent positioning methods | CATT | imported from 3GU |
R2‑1912201 | Considerations on Broadcast Positioning Assistance Data | CATT | imported from 3GU |
R2‑1912202 | Open Issues on Broadcast Positioning Procedure | CATT | imported from 3GU |
R2‑1912203 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | imported from 3GU |
R2‑1912204 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | imported from 3GU |
R2‑1912205 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | imported from 3GU |
R2‑1912206 | Re-consideration on PLMN-wide Filter | CATT | imported from 3GU |
R2‑1912207 | Draft LS on PLMN-wide Filter | CATT | imported from 3GU |
R2‑1912208 | Open Issues of Reference Timing Delivery | CATT | imported from 3GU |
R2‑1912209 | Remaining Issues on Multiple Active SPS/CGs | CATT | imported from 3GU |
R2‑1912210 | Discussion on Ethernet Header Compression | CATT | imported from 3GU |
R2‑1912211 | Data/data prioritization | CATT | imported from 3GU |
R2‑1912212 | Equal-priority handling | CATT | imported from 3GU |
R2‑1912213 | SR/PUSCH prioritization | CATT | imported from 3GU |
R2‑1912214 | [107#80][NR IIOT] Summary on Deprioritized PDUs (CATT) | CATT | imported from 3GU |
R2‑1912215 | Handling of Dropped MAC PDU | CATT | imported from 3GU |
R2‑1912216 | The prioritization between MAC CEs and UL data | CATT | imported from 3GU |
R2‑1912217 | LCP restriction enhancement for reliability | CATT | imported from 3GU |
R2‑1912218 | On the number of activated legs | CATT, Fujitsu | imported from 3GU |
R2‑1912219 | PDCP Duplication Configuration and Activation/Deactivation | CATT | imported from 3GU |
R2‑1912220 | Discussion on UE based Duplication Activation/Deactivation | CATT | imported from 3GU |
R2‑1912221 | MAC upgrade for SR dropping in PHY | CATT | imported from 3GU |
R2‑1912222 | BSR trigger issue for CA duplication | CATT | imported from 3GU |
R2‑1912223 | On the remaining open issues of 2-step RACH | CATT | imported from 3GU |
R2‑1912224 | Load balancing between RACH Types | CATT | imported from 3GU |
R2‑1912225 | Remaining Issue of RA Type Selection | CATT | imported from 3GU |
R2‑1912226 | Open issues of 2-step CFRA | CATT | imported from 3GU |
R2‑1912227 | NR-U RACH enhancements | SHARP | imported from 3GU |
R2‑1912228 | Report of email discussion [107#56][NB-IoT R15] | NTT DOCOMO INC. | imported from 3GU |
R2‑1912229 | CE Mode Threshold Adjustments for non-BL and BL UE | NTT DOCOMO INC. | imported from 3GU |
R2‑1912230 | Discussion on capability transfer procedure for NR V2X | Spreadtrum Communications | imported from 3GU |
R2‑1912231 | Discussion on SLRB configuration alignment | Spreadtrum Communications | imported from 3GU |
R2‑1912232 | Asymmetric UL and DL frame timing at gNB side | Spreadtrum Communications | imported from 3GU |
R2‑1912233 | Discussion on communication range in V2X | Spreadtrum Communications | imported from 3GU |
R2‑1912234 | Logical channel prioritization Consideration | Spreadtrum Communications | imported from 3GU |
R2‑1912235 | Consideration on activation/deactivation of PDCP duplication | Spreadtrum Communications | imported from 3GU |
R2‑1912236 | Consideration on early measurement reporting | Spreadtrum Communications | imported from 3GU |
R2‑1912237 | Early measurement in NR-U | Spreadtrum Communications | imported from 3GU |
R2‑1912238 | Enhancements of resuming MR-DC configuration for RRC_INACTIVE | Spreadtrum Communications | imported from 3GU |
R2‑1912239 | Mobility Consideration in NR-U | Spreadtrum Communications | imported from 3GU |
R2‑1912240 | Measurement report enhancement in conditional handover | Spreadtrum Communications | imported from 3GU |
R2‑1912241 | RRC signaling size restriction in CHO | Spreadtrum Communications | imported from 3GU |
R2‑1912242 | PSCell Conditional Change Considerations | Spreadtrum Communications | imported from 3GU |
R2‑1912243 | LBT Failures Handling in Non-Connected State | Spreadtrum Communications, Huawei, HiSilicon | imported from 3GU |
R2‑1912244 | Inconsecutive UL LBT Failures Handling | Spreadtrum Communications | imported from 3GU |
R2‑1912245 | Consideration on Logged MDT Report in MR-DC | Spreadtrum Communications | imported from 3GU |
R2‑1912246 | Handling of periodicity misalignment between CG periodicity and TSN traffic periodicity | Spreadtrum Communications | imported from 3GU |
R2‑1912247 | Discussion on CG and CG collision of equal priority | Spreadtrum Communications | imported from 3GU |
R2‑1912248 | Consideration on packet based duplication | Spreadtrum Communications | imported from 3GU |
R2‑1912249 | Some remaining issues on UE capability ID | Spreadtrum Communications | imported from 3GU |
R2‑1912250 | Filter ID for the selection of UE capability ID | Spreadtrum Communications | imported from 3GU |
R2‑1912251 | Discussion on the SuccessRAR for SI request | Spreadtrum Communications | imported from 3GU |
R2‑1912252 | Running CR to 37324 for 5G_V2X_NRSL | vivo (Rapporteur) | imported from 3GU |
R2‑1912253 | Left Issues on NR SL RLC and PDCP | vivo | imported from 3GU |
R2‑1912254 | Uplink and Sidelink transmission prioritization in NR V2X | vivo | imported from 3GU |
R2‑1912255 | Indication and resource configuration on HARQ enable disable | vivo | imported from 3GU |
R2‑1912256 | Discussion on SR and BSR | vivo | imported from 3GU |
R2‑1912257 | Discussion on Truncated Sidelink BSR | vivo | imported from 3GU |
R2‑1912258 | Remaining issues on sidelink configured grant | vivo | imported from 3GU |
R2‑1912259 | Left issues for PC5-S messages | vivo | imported from 3GU |
R2‑1912260 | Discussion on sideink radio link management on TX and RX UE | vivo | imported from 3GU |
R2‑1912261 | Remaining issues on PC5-RRC message exchange | vivo | imported from 3GU |
R2‑1912262 | UE ID across multiple PC5-S links | vivo | imported from 3GU |
R2‑1912263 | Report of 107#73 NR V2X SDAP(vivo) | vivo | imported from 3GU |
R2‑1912264 | Left issues on SLRB configuration | vivo | imported from 3GU |
R2‑1912265 | Admission and Congestion control in NR V2X | vivo | imported from 3GU |
R2‑1912266 | Mode switch for QoS guarantee in NR V2X | vivo | imported from 3GU |
R2‑1912267 | Remaining issues about NR SL QoS handling | vivo | imported from 3GU |
R2‑1912268 | Running CR to 37.340 for CA_DC enhancements | vivo, Ericsson | imported from 3GU |
R2‑1912269 | Power control for NR-DC | vivo | imported from 3GU |
R2‑1912270 | Report of [107#35][NR/DCCA] Remaining aspects of early measurement configuration (vivo) | vivo | imported from 3GU |
R2‑1912271 | Early Measurement Reporting for INACTIVE State | vivo | imported from 3GU |
R2‑1912272 | UE measurement behaviour regarding autonomous state transition | vivo | imported from 3GU |
R2‑1912273 | IDC impact for early measurement | vivo | imported from 3GU |
R2‑1912274 | Discussion on fast radio link recovery | vivo | imported from 3GU |
R2‑1912275 | Behavior of dormancy SCell and Scell activation | vivo | imported from 3GU |
R2‑1912276 | Minimize signaling overhead for cell setup of MR-DC | vivo | imported from 3GU |
R2‑1912277 | Remaining issues on MCG fast recovery | vivo | imported from 3GU |
R2‑1912278 | UE capability parameters for SON_MDT | vivo | imported from 3GU |
R2‑1912279 | Running CR to 38.306 for NR_SON_MDT | vivo | imported from 3GU |
R2‑1912280 | Autonomous Gap capability for CGI reporting | vivo, Ericsson | imported from 3GU |
R2‑1912281 | [Draft] Reply LS on autonomous gap capability | vivo | imported from 3GU |
R2‑1912282 | SMTC for sync SSB frequency and non-sync SSB frequency | OPPO | imported from 3GU |
R2‑1912283 | UE measurement behavior due to lower priority frequency and OOS | OPPO | imported from 3GU |
R2‑1912284 | Fast Scell activation in sTAG | OPPO | imported from 3GU |
R2‑1912285 | Introduction of dormancy behavior in NR | OPPO | imported from 3GU |
R2‑1912286 | Supporting RRC reestablishment to SN RAT cell | OPPO | imported from 3GU |
R2‑1912287 | RRC Resume for MR-DC with 5GC | OPPO | imported from 3GU |
R2‑1912288 | SCell or SCG activation in RRC_INACTIVE | OPPO | imported from 3GU |
R2‑1912289 | Security algorithom update in RRC reestablishment message | OPPO,Huawei | imported from 3GU |
R2‑1912290 | Configuration limitation for RRCRelease message in R15 | OPPO | imported from 3GU |
R2‑1912291 | Discussion on Cached Data Handling for INACTIVE UE | OPPO | imported from 3GU |
R2‑1912292 | Discussion on DRB IP failure handling and data recovery | OPPO | imported from 3GU |
R2‑1912293 | Open issues for early measurement | OPPO | imported from 3GU |
R2‑1912294 | Lossless Make-Before-Break (MBB) HO support for Low latency, high reliability services | Qualcomm Incorporated | imported from 3GU |
R2‑1912295 | Source connection handling during Make-Before-Break (MBB) HO | Qualcomm Incorporated | imported from 3GU |
R2‑1912296 | DAPS HO support for simultaneous Tx not feasible scenarios | Qualcomm Incorporated | imported from 3GU |
R2‑1912297 | Conditional NR PSCell addition/change procedures | Qualcomm Incorporated | imported from 3GU |
R2‑1912298 | Conditional NR PSCell addition/change failure handling | Qualcomm Incorporated | imported from 3GU |
R2‑1912299 | Supporting per DRB MBB HO configuration | Qualcomm Incorporated | imported from 3GU |
R2‑1912300 | Support Tx sharing during DAPS HO | Qualcomm Incorporated | imported from 3GU |
R2‑1912301 | Remaining Aspects of Configured Grant Transmission for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1912302 | Remaining issues on 4-step RACH for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1912303 | Running CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1912304 | Details of the Uplink LBT failure mechanism | Qualcomm Incorporated | imported from 3GU |
R2‑1912305 | Broadcasting of System Information in NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1912306 | Support for Indian Navigation Satellite System (NavIC) | Reliance Jio | imported from 3GU |
R2‑1912307 | Remaining Issues on Ethernet Header Compression | China Telecommunications | imported from 3GU |
R2‑1912308 | Fast Recovery with CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912309 | Consideration on idle and inactive mode procedures | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1912310 | Consideration on connected mode procedures | Huawei, HiSilicon | imported from 3GU |
R2‑1912311 | Propagation delay compensation for reference time | vivo | imported from 3GU |
R2‑1912312 | Email discussion summary on EHC | vivo | imported from 3GU |
R2‑1912313 | Remaining issues for EHC | vivo | imported from 3GU |
R2‑1912314 | TP on TS 38.323 of EHC | vivo | imported from 3GU |
R2‑1912315 | TP on TS 38.331 of EHC | vivo | imported from 3GU |
R2‑1912316 | Discussion on the periodicity misalignment between TSC traffic and SPS/CG | vivo | imported from 3GU |
R2‑1912317 | URLLC transmission within measurement gap | vivo | imported from 3GU |
R2‑1912318 | SPS and CG configuration issue on the partial overlapping TSN traffic pattern | vivo | imported from 3GU |
R2‑1912319 | Reliability-based LCP Restriction Enhancement for DG | vivo | imported from 3GU |
R2‑1912320 | Discussion on the MAC PDU recovery procedure | vivo | imported from 3GU |
R2‑1912321 | Remaining issues of the network-controlled duplication | vivo | imported from 3GU |
R2‑1912322 | Remaining issue for the priority of PUSCH and SR | vivo | imported from 3GU |
R2‑1912323 | Discussion on the PUSCH priority based on MAC CE | vivo | imported from 3GU |
R2‑1912324 | Discussion on the LCP restriction for CA duplication | vivo | imported from 3GU |
R2‑1912325 | Adding the Phase Bias Indicator to the SSR Phase Bias message | Swift Navigation | imported from 3GU |
R2‑1912326 | Correction on PUCCH transform precoding | vivo, Nokia (rapporteur) | imported from 3GU |
R2‑1912327 | Cell re-selection during RRC connection resume | vivo | imported from 3GU |
R2‑1912328 | Discussion on LS about beamSwitchTiming value of 224 and 336 | vivo, Huawei, Hisilicon | imported from 3GU |
R2‑1912329 | Introduction of NR IDC solution | vivo | imported from 3GU |
R2‑1912330 | WUS impact on Short DRX cycle | vivo, Qualcomm Inc., Spreadtrum, Huawei, Hisilicon | imported from 3GU |
R2‑1912331 | WUS impact upon BWP switching | vivo | imported from 3GU |
R2‑1912332 | Stage-3 design for per-BWP MIMO layer adaptation | vivo | imported from 3GU |
R2‑1912333 | UE assistance information for power saving | vivo | imported from 3GU |
R2‑1912334 | RRM measurement relaxation criteria | vivo | imported from 3GU |
R2‑1912335 | UE Power Consumption Reduction in RRM Measurement | vivo | imported from 3GU |
R2‑1912336 | Summary of EmailDis-78 on MAC aspects for mobility enhancement | vivo (rapporteur) | imported from 3GU |
R2‑1912337 | Summary of EmailDis-78 on Text Proposal for 38321 of mobility | vivo (rapporteur) | imported from 3GU |
R2‑1912338 | Summary of EmailDis-78 on Text Proposal for 36321 of mobility | vivo (rapporteur) | imported from 3GU |
R2‑1912339 | Conditional Handover without explict trigger condition | vivo | imported from 3GU |
R2‑1912340 | Discussion on CHO release | vivo | imported from 3GU |
R2‑1912341 | Discussion on the HOF for CHO | vivo | imported from 3GU |
R2‑1912342 | Discussion on the number of prepared cells for CHO | vivo | imported from 3GU |
R2‑1912343 | Conditional PSCell addition and change | vivo | imported from 3GU |
R2‑1912344 | Text proposal for conditional PSCell addition and change | vivo | imported from 3GU |
R2‑1912345 | Discussion on the selective PDCP retransmission at UL PDCP PDU switching | vivo | imported from 3GU |
R2‑1912346 | Discussion on the ROHC failure issue | vivo | imported from 3GU |
R2‑1912347 | Clarificaiton on the reordering after ROHC decompression for NR PDCP | vivo | imported from 3GU |
R2‑1912348 | Issue on the potential duplicated PDCP packets at the network side | vivo | imported from 3GU |
R2‑1912349 | Summary of Email Discussion on CP for DAPS | vivo (rapporteur) | imported from 3GU |
R2‑1912350 | Discussion on the signaling procedures of the RUDI HO | vivo | imported from 3GU |
R2‑1912351 | RAN2 specification impacts of SCell BFR | vivo | imported from 3GU |
R2‑1912352 | Text proposal for 38.321 of SCell BFR | vivo | imported from 3GU |
R2‑1912353 | Text proposal for 38.331 of SCell BFR | vivo | imported from 3GU |
R2‑1912354 | Data forwarding in RUDI HO | Ericsson | imported from 3GU |
R2‑1912355 | ROHC handling in RUDI HO | Ericsson | imported from 3GU |
R2‑1912356 | Uplink handling in RUDI HO | Ericsson | imported from 3GU |
R2‑1912357 | Handover interruption reduction for UM bearers | Ericsson | imported from 3GU |
R2‑1912358 | Control plane handling in RUDI HO | Ericsson | imported from 3GU |
R2‑1912359 | TDM pattern for single uplink in RUDI HO | Ericsson | imported from 3GU |
R2‑1912360 | Further aspects of SNPN | Ericsson | imported from 3GU |
R2‑1912361 | Further aspects of PNI-NPN | Ericsson | imported from 3GU |
R2‑1912362 | Introduction of Multiple LTE-CRS-RateMatchPatterns | Ericsson | imported from 3GU |
R2‑1912363 | PDCP version in EN-DC | Ericsson | imported from 3GU |
R2‑1912364 | PDCP version in EN-DC | Ericsson | imported from 3GU |
R2‑1912365 | Remaining issues for routing | Huawei, HiSilicon | imported from 3GU |
R2‑1912366 | Remaining issues for bearer mapping | Huawei, HiSilicon | imported from 3GU |
R2‑1912367 | Flow control for IAB networks | Huawei, HiSilicon | imported from 3GU |
R2‑1912368 | BAP PDU format | Huawei, HiSilicon | imported from 3GU |
R2‑1912369 | Remaining issues for uplink scheduling enhancement | Huawei, HiSilicon | imported from 3GU |
R2‑1912370 | LCID and LCG space extension for IAB backhaul link | Huawei, HiSilicon | imported from 3GU |
R2‑1912371 | General RLC impacts | Huawei, HiSilicon | imported from 3GU |
R2‑1912372 | RACH related issues for IAB | Huawei, HiSilicon | imported from 3GU |
R2‑1912373 | Support of UE PDCP duplication | Huawei, HiSilicon | imported from 3GU |
R2‑1912374 | Backhaul RLF Recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1912375 | BAP and RLC configurations | Huawei, HiSilicon | imported from 3GU |
R2‑1912376 | Cell (re)Selection and Access Control and Connection Establishment | Huawei, HiSilicon | imported from 3GU |
R2‑1912377 | Running CR to TS 38.331 for 5G V2X with NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1912378 | Discussion on multi-mode co-existence | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912379 | Consideration on mode1 resource allocation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912380 | Discussion on UL and SL prioritisation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912381 | Consideration on NR V2X CBR | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912382 | Discussion on left issue in NR V2X PDCP | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912383 | Left issues for MAC in NR V2X | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912384 | Considerations on sidelink RLC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912385 | Discussion on PC5 RRC procedure for unicast | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912386 | Discussion on remaining issues on SLRB parameters | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912387 | Discussion on SDAP issues | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912388 | Consideration on sidelink RLM management | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912389 | Consideration on exceptional resource pool and system information acquisition | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912390 | Consideration on NR V2X cross RAT support | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912391 | SLRB maintenance during RRC state transition | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912392 | (running)36.304CR on cell selection(reselection) for NR V2X UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912393 | (running)38.304CR on cell selection(reselection) for NR V2X UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912394 | Consideration on the issue of SI update | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1912395 | Indication of contentionDetected per SSB | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1912396 | DRX enhancement for NR-U | Xiaomi Communications | imported from 3GU |
R2‑1912397 | Consideration on MDT in NR | Xiaomi Communications | imported from 3GU |
R2‑1912398 | Consideration on SR transmission | Xiaomi Communications | imported from 3GU |
R2‑1912399 | Consideration on the blind SCG configuration | Beijing Xiaomi Mobile Software | imported from 3GU |
R2‑1912400 | PCell monitoring during conditional PSCell addition/change | OPPO | imported from 3GU |
R2‑1912401 | PCell monitoring during conditional PSCell addition/change | OPPO | imported from 3GU |
R2‑1912402 | Discussion on T312 for PSCell | OPPO | imported from 3GU |
R2‑1912403 | UL switching time for DAPS HO | OPPO | imported from 3GU |
R2‑1912404 | Correction on RRC Resume procedure | OPPO | imported from 3GU |
R2‑1912405 | Revision to Non-Terrestrial Networks scenarios | HUGHES Network Systems Ltd | imported from 3GU |
R2‑1912406 | Remaining issues on UE capability ID | Huawei, HiSilicon | imported from 3GU |
R2‑1912407 | Remaining issues on UE capability segmentation | Huawei, HiSilicon | imported from 3GU |
R2‑1912408 | UE CLI Measurement Configuration, Reporting and NW Signalling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912409 | LS to RAN3 For Exchange of Information related to UE CLI measurement configuration and reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912410 | GWUS Configuration and Resource mapping for UE-Group Information | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912411 | Remaining Issues for D-PUR Signalling Procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912412 | D-PUR for Control Plane Solution | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912413 | Further analysis of Msg4 based MT EDT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912414 | Running CR for 36.304 -Rel-16 eMTC Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912415 | Source PS Release of PDCP DAPS during RUDI Handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912416 | Broadcast of Barometric Pressure Assistance Data | Polaris Wireless, FirstNet, Intel, AT&T, NextNav | imported from 3GU |
R2‑1912417 | Running 36.300 CR for LTE_feMob | China Telecom Corporation Ltd. | imported from 3GU |
R2‑1912418 | Correction to applicability of UP IP in NR | Ericsson | imported from 3GU |
R2‑1912419 | Correction to applicability of UP IP in NR | Ericsson | imported from 3GU |
R2‑1912420 | Operation Principles of PC5 RRC Connection | Futurewei | imported from 3GU |
R2‑1912421 | Sensor Provide Location Information Element Correction | Polaris Wireless | imported from 3GU |
R2‑1912422 | Sensor Provide Location Information Elements Correction | Polaris Wireless | imported from 3GU |
R2‑1912423 | Remaining Issues for Extending RAR Window | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912424 | Contention Resolution Timer Handling in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912425 | Signaling Multiple UL grants for Msg3 Transmission in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912426 | Draft RRC CR_Supporting RAR Window Size larger than 10ms in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912427 | Random Access Resource Selection in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912428 | Draft RRC CR for supporting Additional Opportunities for paging in NR-U | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912429 | Handling MIB_SIB1 Acquisition Failure | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912430 | 2 Step RA_12bit Timing Advanced Information | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912431 | 2 Step RA_RACH prioritisation | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912432 | 2 Step RACH_RNTI for Receiving Network Response | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912433 | 2 Step RA_RACH Configuration | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912434 | Impact of Mode 1 Resource Allocation on Uu BWP Operation | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912435 | RRC Connection Initiation Trigger for V2X Sidelink Communication | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912436 | RAN2 Aspects of SCell BFR | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912437 | Discussion on (preventing) access to NPN only cell | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912438 | UE reporting for mobility optimization | vivo | imported from 3GU |
R2‑1912439 | Bi-directional UE capability transfer procedure for NR V2X unicast | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912440 | Remaining Issues on Handling of SLRB configuration | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912441 | AS-layer configuration failure case in SL unicast | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912442 | Discussion on handling of PC5-S messages for NR V2X unicast | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912443 | Discussion on Sidelink UE Information Initiation Trigger for NR V2X Sidelink Communication | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912444 | Interaction between RRC Connection Resume Condition and RNAU for NR V2X SL Communication | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912445 | Remaining Issues on SL RLM/RLF Declaration for NR V2X Unicast | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912446 | Correction on H1 and H2 events | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1912447 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | China Telecom, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | imported from 3GU |
R2‑1912448 | Stage2 CR-Support of Inter-RAT HO between NR to EN-DC in Rel-16 | China Telecom, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | imported from 3GU |
R2‑1912449 | Further discussion on MCG failure recovery via SRB3 | SHARP Corporation | imported from 3GU |
R2‑1912450 | Discussion on priority value in LTE V2X | SHARP Corporation | imported from 3GU |
R2‑1912451 | Correction on priority values in LTE V2X | SHARP Corporation | imported from 3GU |
R2‑1912452 | Correction on priority values in LTE V2X | SHARP Corporation | imported from 3GU |
R2‑1912453 | Correction on value of sensing priority for sidelink mode 3 sensing measurement | SHARP Corporation | imported from 3GU |
R2‑1912454 | Discussion on the timer design for CHO | vivo | imported from 3GU |
R2‑1912455 | CAPC for RACH and PUCCH in NR-U | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912456 | SI scheduling enhancements for NR-U | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912457 | On Restrictions in Multiplexing of High and Low Priority LCH in NR-U | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912458 | On Reusing Overheating Assistance Information for UE Power Saving | Samsung | imported from 3GU |
R2‑1912459 | On Triggering RRM Measurement Relaxation | Samsung | imported from 3GU |
R2‑1912460 | Leg Selection for Non-duplicated Data Transmission | Apple | imported from 3GU |
R2‑1912461 | LCH-to-cell Restriction for CA Duplication Deactivation | Apple, Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912462 | Selective PDCP Duplication Enhancement | Apple | imported from 3GU |
R2‑1912463 | UE based PDCP Duplication Enhancement | Apple | imported from 3GU |
R2‑1912464 | Consecutive Conditional Handover | Apple | imported from 3GU |
R2‑1912465 | UE Measurement in SCell Dormant State | Apple | imported from 3GU |
R2‑1912466 | PCell Fast Recovery | Apple | imported from 3GU |
R2‑1912467 | UE Assistance Information for EN-DC | Apple | imported from 3GU |
R2‑1912468 | MsgB Retransmission Scheme | Apple | imported from 3GU |
R2‑1912469 | 2-step CFRA | Apple | imported from 3GU |
R2‑1912470 | SCell BFR Operation | Apple | imported from 3GU |
R2‑1912471 | Considering top N cells for PLMN Selection | Samsung | imported from 3GU |
R2‑1912472 | RLM for NR-U | Samsung | imported from 3GU |
R2‑1912473 | On Supporting Make-Before-Break in NR | Samsung | imported from 3GU |
R2‑1912474 | Recovery of consistent UL LBT failures | Samsung | imported from 3GU |
R2‑1912475 | Remaining issues on CAPC | Samsung | imported from 3GU |
R2‑1912476 | To reduce SCell activation delay in NR | Samsung | imported from 3GU |
R2‑1912477 | Support of unaligned frame boundary for inter-band TDD CA | Samsung | imported from 3GU |
R2‑1912478 | TA handling in 2-step RACH | Samsung | imported from 3GU |
R2‑1912479 | Introducing Make-Before-Break in NR | Samsung | imported from 3GU |
R2‑1912480 | (De)Prioritizing the Access for IAB Setup | Samsung | imported from 3GU |
R2‑1912481 | Including RSSI and Channel Occupancy in Connected Mode Measurements | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912482 | Accessibility Measurements for NR MDT | Samsung | imported from 3GU |
R2‑1912483 | Details on Event-triggered Logged MDT | Samsung | imported from 3GU |
R2‑1912484 | CAPC Assignments for SRBs in NR-U | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912485 | Further Logged Information in NR MDT | Samsung | imported from 3GU |
R2‑1912486 | NR RLF Report | Samsung | imported from 3GU |
R2‑1912487 | On Providing Mobility State and Mobility History Information in NR | Samsung | imported from 3GU |
R2‑1912488 | On Providing Mobility State and Mobility History Information in NR | Samsung | imported from 3GU |
R2‑1912489 | SLRB Reconfiguration Handling | Samsung | imported from 3GU |
R2‑1912490 | Discussion on MCG Fast Recovery | Samsung | imported from 3GU |
R2‑1912491 | Discussion on FailureInformation | Samsung | imported from 3GU |
R2‑1912492 | DL Reordering Problem at MCG Link Recovery | Samsung | imported from 3GU |
R2‑1912493 | Remaining Issues on Efficient Transition | Samsung | imported from 3GU |
R2‑1912494 | Support of Multiple Active CG/SPS Configuration | Samsung | imported from 3GU |
R2‑1912495 | Prioritization of SR Transmission for URLLC | Samsung | imported from 3GU |
R2‑1912496 | Split Bearer Fallback at Deactivation of PDCP Duplication | Samsung | imported from 3GU |
R2‑1912497 | Configuration and initial state of PDCP duplication | Samsung | imported from 3GU |
R2‑1912498 | Leftover Issues on Accurate Timing Delivery | Samsung | imported from 3GU |
R2‑1912499 | Discussion on UE Autonomous PDCP Duplication | Samsung | imported from 3GU |
R2‑1912500 | Priority of MAC PDU and MAC CE | Samsung | imported from 3GU |
R2‑1912501 | Transmission of Deprioritized Data | Samsung | imported from 3GU |
R2‑1912502 | LCP Restriction on Reliability | Samsung | imported from 3GU |
R2‑1912503 | MAC CE Format for RLC Activiation | Samsung | imported from 3GU |
R2‑1912504 | Discussion on RLM for LTE mobility enhancement | OPPO | imported from 3GU |
R2‑1912505 | Further details on dual active protocol stack | OPPO | imported from 3GU |
R2‑1912506 | Further considerations on capability coordination | OPPO | imported from 3GU |
R2‑1912507 | Clarification on HRNN reporting | OPPO | imported from 3GU |
R2‑1912508 | Discussion on SIB1 design for NPN | OPPO | imported from 3GU |
R2‑1912509 | Discussion on SCell BFR | OPPO | imported from 3GU |
R2‑1912510 | MAC CE format to indicate up to two TCI states | OPPO | imported from 3GU |
R2‑1912511 | MAC CE format to indicate up to 2 TCI state per indication | OPPO | imported from 3GU |
R2‑1912512 | Including RSSI and Channel Occupancy in NR-U UE Capabilities | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912513 | Further considerations for the segmented UECapabilityInformation | Samsung | imported from 3GU |
R2‑1912514 | MAC CE design for support of multiple beam indication for single PDCCH-based multiple TRPs | Samsung | imported from 3GU |
R2‑1912515 | Further considerations of support for multi-PDCCH based multi-TRP operation | Samsung | imported from 3GU |
R2‑1912516 | Discussion on the additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1912517 | Additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1912518 | Additional UE capability filtering to limit the total number of carriers in NR | Samsung | imported from 3GU |
R2‑1912519 | SSR Atmospheric Correction Points Area Definition | u-blox AG | imported from 3GU |
R2‑1912520 | Text Proposal for addition of SSR Atmospheric Correction Points Area Definition | u-blox AG | imported from 3GU |
R2‑1912521 | MCG RLF reporting via SCell | Samsung Research America | imported from 3GU |
R2‑1912522 | PDCP security issue | Samsung Research America | imported from 3GU |
R2‑1912523 | CR on PDCP security issue | Samsung Research America | imported from 3GU |
R2‑1912524 | Fallback procedure for INACTIVE mode | Samsung Research America | imported from 3GU |
R2‑1912525 | Unnecessary deciphering for duplicated PDUs | Samsung Research America | imported from 3GU |
R2‑1912526 | CR on unnecessary deciphering for duplicated PDU | Samsung Research America | imported from 3GU |
R2‑1912527 | Feedback for EHC algorithm | Samsung Research America | imported from 3GU |
R2‑1912528 | EHC header handling for IIoT | Samsung Research America | imported from 3GU |
R2‑1912529 | measurement aspects for CHO | Samsung R&D Institute UK | imported from 3GU |
R2‑1912530 | T312 further enhancement | Samsung R&D Institute UK | imported from 3GU |
R2‑1912531 | relaxed RRM support | Samsung R&D Institute UK | imported from 3GU |
R2‑1912532 | introduction of channel occupancy and RSSI for NR-U CHO | Samsung R&D Institute UK | imported from 3GU |
R2‑1912533 | considerations for NR ECID | Samsung R&D Institute UK | imported from 3GU |
R2‑1912534 | Consideration of beam for NR OTDOA | Samsung R&D Institute UK | imported from 3GU |
R2‑1912535 | EN-DC support in IAB (srb, drb, data flow ) | Samsung R&D Institute UK | imported from 3GU |
R2‑1912536 | NR DC support (which link is MCG link, SCG link, MN, SN role in DU | Samsung R&D Institute UK | imported from 3GU |
R2‑1912537 | RLF reporting in dual connection of IAB | Samsung R&D Institute UK | imported from 3GU |
R2‑1912538 | Running CR for 38.331 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1912539 | Running CR for 36.331 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1912540 | Running CR for 36.300 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1912541 | Running CR for 38.300 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1912542 | NR-DC power control | Ericsson | imported from 3GU |
R2‑1912543 | Idle measurement configuration in UE Inactive AS context | Ericsson | imported from 3GU |
R2‑1912544 | Handling of early measurement configuration and results | Ericsson | imported from 3GU |
R2‑1912545 | Applicability of early measurement solutions for LTE | Ericsson | imported from 3GU |
R2‑1912546 | Extended use cases for early measurement other than fast CA/DC setup | Ericsson | imported from 3GU |
R2‑1912547 | On further aspects of early measurement | Ericsson | imported from 3GU |
R2‑1912548 | Remaining issues for reference time delivery | Ericsson | imported from 3GU |
R2‑1912549 | On downlink delay compensation | Ericsson | imported from 3GU |
R2‑1912550 | SPS and UL CG remaining configuration aspects | Ericsson | imported from 3GU |
R2‑1912551 | L2 aspects of SPS and UL CG | Ericsson | imported from 3GU |
R2‑1912552 | Miscellaneous issues with L2 impact | Ericsson | imported from 3GU |
R2‑1912553 | Ethernet header compression | Ericsson | imported from 3GU |
R2‑1912554 | Handling of de-prioritized MAC PDUs | Ericsson | imported from 3GU |
R2‑1912555 | Main functions of intra-UE data-data prioritization | Ericsson | imported from 3GU |
R2‑1912556 | Reliability aspects in LCP restriction enhancement | Ericsson | imported from 3GU |
R2‑1912557 | Intra-UE Control-Data prioritization - SR over PUSCH | Ericsson | imported from 3GU |
R2‑1912558 | PDCP Control PDUs and primary path | Ericsson | imported from 3GU |
R2‑1912559 | Open issues related to MAC CE for PDCP duplication | Ericsson | imported from 3GU |
R2‑1912560 | Discussion on Potential improvements for delay critical QoS Flows | Ericsson | imported from 3GU |
R2‑1912561 | draft reply LS on potential improvements for delay critical QoS flows | Ericsson | imported from 3GU |
R2‑1912562 | Apparent contradiction in Zone Configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912563 | BSR and SR reporting in Cross RAT V2X operation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912564 | Cross RAT SL Configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912565 | HARQ feedback impact on RAN2 | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912566 | PC5-S and Identification on PC5 RRC and RRC Procedures | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912567 | RLM Procedure and RLF Recovery handling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912568 | Subtopics to be addressed in Sim M1M2 | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912569 | Handling UL LBT Failures in NR-U | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1912570 | Impact of disabling HARQ on DRX | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1912571 | Management based MDT configuration Handling for RRC Inactive state | Qualcomm Incorporated | imported from 3GU |
R2‑1912572 | Report on email discussion [106#46][IAB]: Low-latency scheduling | Samsung Electronics GmbH | imported from 3GU |
R2‑1912573 | Remaining issues with pre-emptive BSR | Samsung Electronics GmbH | imported from 3GU |
R2‑1912574 | Signalling Based MDT Configuration Handling for RRC_INACTIVE | Qualcomm Incorporated | imported from 3GU |
R2‑1912575 | LCID space extension | Samsung Electronics GmbH | imported from 3GU |
R2‑1912576 | Downlink hop-by-hop flow control | Samsung Electronics GmbH | imported from 3GU |
R2‑1912577 | On the need for bearer ID in the BAP header | Samsung Electronics GmbH | imported from 3GU |
R2‑1912578 | Logged MDT Configuration and Reporting for MR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1912579 | Cross-RAT RLF Report | Qualcomm Incorporated | imported from 3GU |
R2‑1912580 | Discussion on BAP configuration in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912581 | Further consideration on bearer mapping | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912582 | Consideration on routing in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912583 | Discussion on re-routing in IAB network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912584 | Further consideration on flow control in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912585 | Control plane signalling deliver in NSA deployment | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912586 | Discussion on low latency scheduling in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912587 | Discussion on low latency scheduling in multi-connectivity scenario | ZTE Corporation, Sanechips, NEC | imported from 3GU |
R2‑1912588 | Consideration on the Extension of LCID and LCG Space in IAB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912589 | Discussion on IAB BH RLF handling | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912590 | Discussion on BH RLC channel configuration in IAB network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912591 | Discussion on IAB node connection setup | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912592 | UE History Information | Qualcomm Incorporated | imported from 3GU |
R2‑1912593 | Discussion about Successful HO in MRO | Qualcomm Incorporated | imported from 3GU |
R2‑1912594 | Periodical logged measurements and event-triggered logged measurements configuration | Qualcomm Incorporated | imported from 3GU |
R2‑1912595 | Make before break for NTN | Ericsson | imported from 3GU |
R2‑1912596 | [Rapporteur input] RRC parameter list for NR eMIMO | Samsung | imported from 3GU |
R2‑1912597 | Ephemeris data | Ericsson | imported from 3GU |
R2‑1912598 | Introduction of additional enhancements for NB-IoT in TS 36.331 | Huawei | imported from 3GU |
R2‑1912599 | Introduction of additional enhancements for NB-IoT | Huawei | imported from 3GU |
R2‑1912600 | Introduction of UE specific DRX for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1912601 | Discussion on DL channel Quality remaining open issues | Huawei, HiSilicon | imported from 3GU |
R2‑1912602 | Discussion on RRM measurements on non-anchor carrier | Huawei, HiSilicon | imported from 3GU |
R2‑1912603 | Discussion on SON ANR remaining open issues | Huawei, HiSilicon | imported from 3GU |
R2‑1912604 | Discussion on SON RACH and RLF remaining open issues | Huawei, HiSilicon | imported from 3GU |
R2‑1912605 | Clarification on UP-EDT | Huawei, HiSilicon | imported from 3GU |
R2‑1912606 | Discussion on MT-EDT Msg4 based option | Huawei, HiSilicon | imported from 3GU |
R2‑1912607 | [DRAFT] LS on Mobile-terminated Early Data Transmission | Huawei | imported from 3GU |
R2‑1912608 | Discussion on RAN1 agreements on D-PUR | Huawei, HiSilicon | imported from 3GU |
R2‑1912609 | FFSes on D-PUR | Huawei, HiSilicon | imported from 3GU |
R2‑1912610 | Handling of D-PUR configuration for CP solution | Huawei, HiSilicon | imported from 3GU |
R2‑1912611 | [Draft] LS on handling of D-PUR configuration for the CP solution | Huawei | imported from 3GU |
R2‑1912612 | DRX timers in multiple TBs scheduling of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R2‑1912613 | DRX timers in multiple TBs scheduling of eMTC | Huawei, HiSilicon | imported from 3GU |
R2‑1912614 | Remaining issues to support user plane optimisations for eMTC and NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912615 | Support of RRC connection Re-establishment for the Control plane for NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912616 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912617 | Discussion on support of RRC_INACTIVE for eMTC connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912618 | Unified access control for NB-IoT and eMTC connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912619 | PDCP for NB-IoT and eMTC connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912620 | Remaining issues for mode1 and 2 operation | Intel Corporation | imported from 3GU |
R2‑1912621 | NR UL SL prioritization aspects | Intel Corporation | imported from 3GU |
R2‑1912622 | On admission/congestion control | Intel Corporation | imported from 3GU |
R2‑1912623 | Remaining aspects on groupcast operation | Intel Corporation | imported from 3GU |
R2‑1912624 | Cross-RAT scheduling for NR V2X SL | Intel Corporation | imported from 3GU |
R2‑1912625 | Detecting and Handling of UL LBT failures | Intel Corporation | imported from 3GU |
R2‑1912626 | Further consideration on configured UL grant enhancement | Intel Corporation | imported from 3GU |
R2‑1912627 | Channel Access Priority selection & multiplexing for Configured Grant | Intel Corporation | imported from 3GU |
R2‑1912628 | Sidelink and Uplink Prioritization | Samsung | imported from 3GU |
R2‑1912629 | Congestion control in NR-V2X | Samsung | imported from 3GU |
R2‑1912630 | Discussion on V2X specific validity area | Samsung | imported from 3GU |
R2‑1912631 | Discussion on Default SLRB and HARQ configuration | Samsung | imported from 3GU |
R2‑1912632 | Open issues from email discussion [107#30][NR/LTE/Mob-enh] | Ericsson | imported from 3GU |
R2‑1912633 | Handling of a HO command while UE is monitoring CHO | Ericsson | imported from 3GU |
R2‑1912634 | Suspend while monitoring CHO in NR | Ericsson | imported from 3GU |
R2‑1912635 | Conditional PSCell addition/change | Ericsson | imported from 3GU |
R2‑1912636 | TP for 38.331 on CHO | Ericsson | imported from 3GU |
R2‑1912637 | Further details on CHO failure handling | Ericsson | imported from 3GU |
R2‑1912638 | Discussion on incoming LS for QoE measurement collection in LTE | Ericsson | imported from 3GU |
R2‑1912639 | Corrections of QoE measurement collection | Ericsson | imported from 3GU |
R2‑1912640 | Draft reply LS on QoE Measurement Collection | Ericsson | imported from 3GU |
R2‑1912641 | Outstanding issues for SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1912642 | Measurements for SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1912643 | Running CR for introduction of SRVCC from 5G to 3G | Ericsson | imported from 3GU |
R2‑1912644 | Extended PO and early termination for page monitoring | Ericsson | imported from 3GU |
R2‑1912645 | Cell (re)selection for NR-U | Ericsson | imported from 3GU |
R2‑1912646 | RRM in NR-U | Ericsson | imported from 3GU |
R2‑1912647 | SLRB configuration for NR V2X UE | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912648 | Discussion on QoS management for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912649 | RRM Measurements for Mobility in NR-U | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1912650 | Resource Pool Sharing between Mode 1 and Mode 2 UEs | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1912651 | Resource Allocation for Mode 2 NR V2X | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1912652 | Resource Allocation Procedures for NR V2X | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R2‑1912653 | Inclusion of 90MHz UE Bandwidth | Vodafone | imported from 3GU |
R2‑1912654 | On Analysis of RACH Capacity in NTN | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912655 | Improving Cell Reselection using Next Cell Information in NTN | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912656 | Network and cell (re)selection in SNPN access mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912657 | RRC considerations to support SNPNs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912658 | Discussion on PLMN and Cell selection and reselection enhancements for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912659 | RLM/RLF measurement on NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912660 | On UL transmissions during SMTC in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912661 | Handling of pending TB for CG transmission | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912662 | LBT impact to Multi-TTI scheduling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912663 | Impact of LBT on power headroom reporting functionality | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912664 | Report of [107#60] [NR/NTN] RACH capacity evaluation and procedures (ZTE) | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912665 | TP on RACH capacity evaluation and procedures | ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912666 | Consideration on the limited C-RNTI size in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912667 | [DRAFT] LS on handling the limited size of C-RNTI in NTN (FS_NR_NTN_solutions) | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912668 | Location report in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912669 | Consideration on measurements in NTN-TN service continuity | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912670 | Further consideration on tracking area management in NTN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912671 | Clarification on the RRCReconfiguration for unauthenticated emergency call | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912672 | Consideration on UE radio capability ID signaling in inter-node RRC messages | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912673 | Introduction of UE radio capability ID in inter-node RRC messages | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912674 | Introduction of efficient transition out of RRC_CONNECTED by UE assistance in TS38.331 | ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912675 | Further consideration on the System Information of the Private Network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912676 | Considerations on the remaining Idle/Inactive state issues of the Private Network | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912677 | The issue of putting all SIBs in one SI message | PANASONIC R&D Center Germany, MediaTek Inc., vivo, Charter Communications, OPPO | imported from 3GU |
R2‑1912678 | Open issues for msgB formats for 2-step RA | Ericsson | imported from 3GU |
R2‑1912679 | RNTI design and HARQ aspects for 2-step RA | Ericsson | imported from 3GU |
R2‑1912680 | Configuration of 2-step RA | Ericsson | imported from 3GU |
R2‑1912681 | 2-step CFRA | Ericsson | imported from 3GU |
R2‑1912682 | PUSCH selection and MsgA payloads in 2-step RA | Ericsson | imported from 3GU |
R2‑1912683 | 2-step RA 38.331 Draft CR | Ericsson | imported from 3GU |
R2‑1912684 | Impact of systematic LBT failure on UL transmission procedure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912685 | Further details of the RACH procedure for NR-U | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912686 | SL HARQ protocol operation | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912687 | SR trigger for NR SL | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912688 | SL LCP procedure considering the MCR requirements | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912689 | CSI/SRS reporting for WUS | Lenovo, Motorola Mobilty | imported from 3GU |
R2‑1912690 | SCell Beam Failure Recovery Procedure | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912691 | Considerations on the RRM measurement relaxation | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1912692 | Loading Control in the RACH Type Selection | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1912693 | Discussion on the leaving conditions for CHO | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1912694 | SI update notification and PWS notification in WUS | PANASONIC R&D Center Germany | imported from 3GU |
R2‑1912695 | DRX HARQ RTT enhancements for NTN | Nomor Research GmbH | imported from 3GU |
R2‑1912696 | Multiple PLMN Identities in NTN | Nomor Research GmbH | imported from 3GU |
R2‑1912697 | System Information in NTN | Nomor Research GmbH | imported from 3GU |
R2‑1912698 | HARQ process selection and logical channel prioritization | Nomor Research GmbH | imported from 3GU |
R2‑1912699 | MAC CE signaling impact of enhanced TCI indication framework | Ericsson | imported from 3GU |
R2‑1912700 | Report of email discussion [107#39] [NR - eMIMO] | Ericsson | imported from 3GU |
R2‑1912701 | Report of email discussion [107#63][NR/NTN] | Ericsson | imported from 3GU |
R2‑1912702 | Congestion Control in NR V2X | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R2‑1912703 | Running stage 2 CR on NR positioning 107#69 | Intel Corporation, ESA | imported from 3GU |
R2‑1912704 | Support of NR dependent positioning methods | Intel Corporation | imported from 3GU |
R2‑1912705 | Assistance data for UE based DL only positioning | Intel Corporation | imported from 3GU |
R2‑1912706 | Initial Access and Network Setup for IAB | Intel | imported from 3GU |
R2‑1912707 | Multi-route support in IAB | Intel | imported from 3GU |
R2‑1912708 | Flow control in IAB - remaining issues | Intel | imported from 3GU |
R2‑1912709 | Uplink latency reduction | Intel | imported from 3GU |
R2‑1912710 | Further discussion on Backhaul RLF handling | Intel | imported from 3GU |
R2‑1912711 | Handling of Fairness in IAB | Intel | imported from 3GU |
R2‑1912712 | Conditional Handover for Non-Terrestrial Networks | Intel | imported from 3GU |
R2‑1912713 | Access Control for SNPN and CAG | Intel Corporation | imported from 3GU |
R2‑1912714 | Suitability criteria for NPN | Intel Corporation | imported from 3GU |
R2‑1912715 | Support of multiple SPS and CG configurations | Intel | imported from 3GU |
R2‑1912716 | TSC assistance information | Intel | imported from 3GU |
R2‑1912717 | Details for Ethernet header compression solution | Intel | imported from 3GU |
R2‑1912718 | Intra UE prioritization of UL Data and Data | Intel | imported from 3GU |
R2‑1912719 | PDCP duplication with multiple RLC entities | Intel | imported from 3GU |
R2‑1912720 | UE based PDCP duplication activation/deactivation | Intel | imported from 3GU |
R2‑1912721 | Full configuration indication to SN - Feedback on RAN3 LS | Intel | imported from 3GU |
R2‑1912722 | False base station detection – feedback on SA3 LS | Intel | imported from 3GU |
R2‑1912723 | Updates to reestablishment procedure | ZTE Corporation, Sanechips, Intel Corporation | imported from 3GU |
R2‑1912724 | Scheduling enhancements for TSC network | OPPO | imported from 3GU |
R2‑1912725 | Discussion on confirmation MAC CE for TSC network | OPPO | imported from 3GU |
R2‑1912726 | Email discussion summary of [107#55][IIOT] CG/SPS for TSC | OPPO | imported from 3GU |
R2‑1912727 | Discussion on Ethernet Header Compression | OPPO | imported from 3GU |
R2‑1912728 | Other issue on intra-UE prioritization in IIoT | OPPO | imported from 3GU |
R2‑1912729 | Intra-UE prioritization involving configured grant | OPPO | imported from 3GU |
R2‑1912730 | Discussion on SR cancelling on intra-UE prioritization involving SR | OPPO | imported from 3GU |
R2‑1912731 | Intra-UE prioritization between multiple SRs | OPPO, Huawei, HiSilicon | imported from 3GU |
R2‑1912732 | Draft LS on intra-UE prioritization for multiple SRs | OPPO | imported from 3GU |
R2‑1912733 | Discussion on data duplication enhancement in IIoT | OPPO | imported from 3GU |
R2‑1912734 | Discussion on UE-based data duplication enhancement | OPPO | imported from 3GU |
R2‑1912735 | Discussion on potential improvements for delay critical QoS Flows | OPPO | imported from 3GU |
R2‑1912736 | On Maximum Number of CHO Candidate Cells and Nodes | Charter Communications, Inc | imported from 3GU |
R2‑1912737 | Addition of broadcast of barometric pressure assistance data | Polaris Wireless, FirstNet, Intel, AT&T, NextNav | imported from 3GU |
R2‑1912738 | Addition of broadcast of barometric pressure assistance data | Polaris Wireless, FirstNet, Intel, AT&T, NextNav | imported from 3GU |
R2‑1912739 | Discussion on configuration aspect for CHO | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1912740 | Discussion on execution aspect for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1912741 | Discussion on failure handling for CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1912742 | Discussion on UE capabilities for mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1912743 | Discussion on combination of simultaneous connectivity and CHO | Huawei, HiSilicon | imported from 3GU |
R2‑1912744 | Discussion on fast handover failure recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1912745 | Discussion on CHO for Pscell change | Huawei, HiSilicon | imported from 3GU |
R2‑1912746 | Reprot of email discussion 107-47 | Huawei | imported from 3GU |
R2‑1912747 | Running 38.331 CR for introducing logged MDT | Huawei | imported from 3GU |
R2‑1912748 | Discussion on user consent for MDT | Huawei, HiSilicon, LG Uplus | imported from 3GU |
R2‑1912749 | Discussion on remaining aspects on logged MDT and Accessibility measurements | Huawei, HiSilicon | imported from 3GU |
R2‑1912750 | Discussion on remaining aspects on immediate MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1912751 | Discussion on UE impacts and UE capabilities due to MDT | Huawei, HiSilicon, LG Uplus | imported from 3GU |
R2‑1912752 | Discussion on L2 measurements based on SA5 TS 28.552 | Huawei, HiSilicon | imported from 3GU |
R2‑1912753 | Draft LS on L2 measurements in TS 28.552 | Huawei | imported from 3GU |
R2‑1912754 | Discussion on new L2 measurements | Huawei, HiSilicon, LG Uplus | imported from 3GU |
R2‑1912755 | Discussion on delay measurement and collection | Huawei, HiSilicon | imported from 3GU |
R2‑1912756 | Discussion on RLF report and RACH report for SON | Huawei, HiSilicon | imported from 3GU |
R2‑1912757 | Discussion on mobility history information | Huawei, HiSilicon | imported from 3GU |
R2‑1912758 | Correction to the handling of stored AS context upon CN type change | Huawei, HiSilicon | imported from 3GU |
R2‑1912759 | Discussion on paging issue for LTE-5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912760 | Correction on paging for LTE-5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1912761 | Discussion on UE behaviours on location info for logged MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1912762 | Correction on location info collection for logged MDT | Huawei, HiSilicon | imported from 3GU |
R2‑1912763 | Discussion on potential impacts due to management of QMC | Huawei, HiSilicon | imported from 3GU |
R2‑1912764 | Draft reply LS on QoE Measurement Collection | Huawei | imported from 3GU |
R2‑1912765 | Measurement coordination on maxMeasIdentitiesSCG in MR-DC | ZTE Corporation, Sanechips, Ericsson | imported from 3GU |
R2‑1912766 | Corrections on maxMeasIdentitiesSCG-NR in MR-DC | ZTE Corporation, Sanechips, Ericsson | imported from 3GU |
R2‑1912767 | CR to introduce timer for DRX based SFTD measurement | ZTE Corporation, Sanechips, MediaTek Inc. | imported from 3GU |
R2‑1912768 | Correction on absence of gapPurpose | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912769 | Consideration on DRX coordination in ANR | ZTE Corporation, Sanechips, NEC | imported from 3GU |
R2‑1912770 | Corrections on DRX coordination in ANR | ZTE Corporation, Sanechips, NEC | imported from 3GU |
R2‑1912771 | Report of [107#28][NR R15] Ambiguity of UE FDD&TDD FR1&FR2 RAN2 capability | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912772 | CR for [107#28][NR R15] Ambiguity of UE FDD&TDD FR1&FR2 RAN2 capability | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912773 | Remaining issues on UTRAN measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912774 | Corrections on UTRAN measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912775 | Remaining issues on CLI measurement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912776 | Control plane consideration for dual active protocol stack (DAPS) based RUDI HO | Intel Corporation, Qualcomm Inc, Charter Communications,Mediatek Inc, Apple | imported from 3GU |
R2‑1912777 | Control plane signaling flow for DAPS based RUDI HO | Intel Corporation | imported from 3GU |
R2‑1912778 | Stage 2 TP for DAPS based RUDI | Intel Corporation | imported from 3GU |
R2‑1912779 | Report of [107#30][NR/LTE/Mob-enh] Configuration of CHO and execution condition | Intel Corporation | imported from 3GU |
R2‑1912780 | TS38.331 TP of 107#30 | Intel Corporation | imported from 3GU |
R2‑1912781 | Running CR for the introduction of NR mobility enhancement | Intel Corporation | imported from 3GU |
R2‑1912782 | Capability design for DAPS based RUDI HO | Intel Corporation | imported from 3GU |
R2‑1912783 | DL data forwarding in DAPS based RUDI HO | Intel Corporation | imported from 3GU |
R2‑1912784 | Confirmation of WA for failure handling | Intel Corporation, InterDigital Inc., China Telecom, OPPO, MediaTek, Lenovo, Motorola Mobility, vivo, Spreadtrum, ITRI, Sharp, Panasonic, Xiaomi, ZTE Corporation, Sanechips, LG Electronics, CATT, NEC, Ericsson, Google Inc., Apple | imported from 3GU |
R2‑1912785 | RAN2 details of the wake-up signal | Intel Corporation | imported from 3GU |
R2‑1912786 | Efficient RRC state transition out of RRC_CONNECTED | Intel Corporation | imported from 3GU |
R2‑1912787 | Configuration of MIMO layers per DL BWP | Intel Corporation | imported from 3GU |
R2‑1912788 | UE assistance for C-DRX configuration | Intel Corporation | imported from 3GU |
R2‑1912789 | Relaxation of RRM measurements | Intel Corporation | imported from 3GU |
R2‑1912790 | Remaining aspects on SL PDCP | Intel Corporation | imported from 3GU |
R2‑1912791 | On the support of simultaneous configuration of mode1 and mode2 | Intel Corporation | imported from 3GU |
R2‑1912792 | Need for SL RLC re-establishment | Intel Corporation | imported from 3GU |
R2‑1912793 | PC5 RRC procedure details for NR V2X | Intel Corporation | imported from 3GU |
R2‑1912794 | Further consideration on the SucessRAR design and Fallback RAR | Intel Corporation | imported from 3GU |
R2‑1912795 | Preamble grouping selection or PUSCH TBS size selection for 2-step RACH | Intel Corporation | imported from 3GU |
R2‑1912796 | Support of CFRA in 2-step RACH | Intel Corporation | imported from 3GU |
R2‑1912797 | IAB workplan update | Qualcomm Incorporated (Rapporteur) | imported from 3GU |
R2‑1912798 | IAB (TP to CR on 38300) L2 structures | Qualcomm Incorporated | imported from 3GU |
R2‑1912799 | SA IAB operation with EN-DC UEs | Qualcomm Incorporated | imported from 3GU |
R2‑1912800 | IAB extension of LCID space | Qualcomm Incorporated | imported from 3GU |
R2‑1912801 | IAB extension of LCG space | Qualcomm Incorporated | imported from 3GU |
R2‑1912802 | IAB load reporting to IAB-donor CU-CP | Qualcomm Incorporated | imported from 3GU |
R2‑1912803 | Issue on ping pong state transition for sidelink UE | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1912804 | Discussion on resource allocation | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1912805 | Discussion on sidelink admission control | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1912806 | Discussion on BSR prioritization | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1912807 | Introduction of RACS [36.300] | MediaTek Inc. | imported from 3GU |
R2‑1912808 | Introduction of RACS [38.300] | MediaTek Inc. | imported from 3GU |
R2‑1912809 | Decision on support of delta signalling | MediaTek Inc. | imported from 3GU |
R2‑1912810 | Introduction of UECapabilityInformation segmentation in 36.331 | MediaTek Inc., CATT, Ericsson, Spreadtrum Communications, ZTE Corporation, Sanechips, OPPO, Qualcomm Incorporated | imported from 3GU |
R2‑1912811 | Work plan for RACS-RAN work item | MediaTek Inc., CATT | imported from 3GU |
R2‑1912812 | Access handling for multiple candidate cells in CHO | Futurewei Technologies | imported from 3GU |
R2‑1912813 | Support (or not) of PC5-RRC for groupcast | MediaTek Inc. | imported from 3GU |
R2‑1912814 | Contents and handling of PC5-RRC configuration | MediaTek Inc. | imported from 3GU |
R2‑1912815 | Single vs. multiple PC5-RRC connection | MediaTek Inc. | imported from 3GU |
R2‑1912816 | Procedure and configurations for conditional SN change | Futurewei Technologies | imported from 3GU |
R2‑1912817 | RLM with aperiodic reference signals | MediaTek Inc. | imported from 3GU |
R2‑1912818 | Discussion on RLM & RLF reduction for conditional PSCell addition/change | Futurewei Technologies | imported from 3GU |
R2‑1912819 | RLM and state modelling based on PC5-S connection | MediaTek Inc. | imported from 3GU |
R2‑1912820 | Validity areas based on cell lists | MediaTek Inc. | imported from 3GU |
R2‑1912821 | Email discussion report for [107#79] [LTE/feMOB] Capability coordination for RUDI HO | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1912822 | UE capability sharing aspects for DAPS based enhanced MBB HO | Qualcomm Inc, Charter communications, Intel Corp, Appl Inc, Google Inc | imported from 3GU |
R2‑1912823 | Report on [107#48][NR/MDT] Running 38.331 CR for introducing Immediate MDT and other MDT functions | Ericsson | imported from 3GU |
R2‑1912824 | Running 38.331 CR for introducing Immediate MDT and other MDT functions | Ericsson | imported from 3GU |
R2‑1912825 | Mobility history information reporting from the UE | Ericsson | imported from 3GU |
R2‑1912826 | Logged MDT Configuration & Reporting handling in DC scenarios | Ericsson | imported from 3GU |
R2‑1912827 | Leftover issues for Logged MDT | Ericsson | imported from 3GU |
R2‑1912828 | CR on introducing UE capability for MDT in NR | Ericsson | imported from 3GU |
R2‑1912829 | UE Location Report capability indication for MDT | Ericsson | imported from 3GU |
R2‑1912830 | Area Scope in MDT configuration | Ericsson | imported from 3GU |
R2‑1912831 | Remaining issues for RRC Segmentation | Ericsson | imported from 3GU |
R2‑1912832 | Remaining aspects on Capability ID | Ericsson | imported from 3GU |
R2‑1912833 | Introduction of RRC Segmentation - Downlink | Ericsson | imported from 3GU |
R2‑1912834 | Introduction of RRC Segmentation - Downlink | Ericsson | imported from 3GU |
R2‑1912835 | Segmentation in DL | Ericsson, DT, AT&T, Vodafone | imported from 3GU |
R2‑1912836 | Introduction of RRC Segmentation - Downlink | Ericsson, DT, AT&T, Vodafone | imported from 3GU |
R2‑1912837 | Introduction of RRC Segmentation - Downlink | Ericsson | imported from 3GU |
R2‑1912838 | UL TDM aspects of enhanced MBB HO using Dual Active Protocol Stack | Qualcomm Inc, Charter communications, Intel Corp, MediaTek Inc, Apple Inc, Google Inc | imported from 3GU |
R2‑1912839 | [Draft] LS for DAPS Handover UE capabilities | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1912840 | Split Threshold for DC and NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912841 | NPN Work Plan | Nokia, China Telecom (Rapporteurs) | imported from 3GU |
R2‑1912842 | NPN Stage 2 Draft CR | Nokia, China Telecom (Rapporteurs) | imported from 3GU |
R2‑1912843 | Report of Email Discussion [107#41] on CSG Aspects | Nokia (Rapporteur) | imported from 3GU |
R2‑1912844 | PDCP Reordering Problems | Nokia, Nokia Shanghai Bell, NTT DOCOMO INC. | imported from 3GU |
R2‑1912845 | Fixed LCP Restrictions | Nokia, Ericsson, Fujitsu, Nokia Shanghai Bell | imported from 3GU |
R2‑1912846 | QoS Flow Handling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912847 | MDBV Enforcement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912848 | [Draft] LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1912849 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1912850 | Access stratum changes to support short eDRX for eMTC connected 5GC in RRC_INACTIVE state | Qualcomm Incorporated | imported from 3GU |
R2‑1912851 | Idle Mode cell reselection based on CN type supported | Qualcomm Incorporated | imported from 3GU |
R2‑1912852 | PDCP type to be used for NB-IoT and eMTC connected to 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1912853 | UAC information change indication in 5GC | Qualcomm Incorporated | imported from 3GU |
R2‑1912854 | UE identity for CIoT/5GC UP Optimization and RRC indication to upper layers | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1912855 | Unified access control for NB-IoT connected to 5GC | Qualcomm India Pvt Ltd | imported from 3GU |
R2‑1912856 | Remaining issues in MT EDT for UP solution | Intel Corporation | imported from 3GU |
R2‑1912857 | Remaining issues in Msg4-based Control Plane solution for MT EDT | Intel Corporation | imported from 3GU |
R2‑1912858 | After the acquisition of ETWS/CMAS by non-BL UEs in connected mode | Intel Corporation | imported from 3GU |
R2‑1912859 | Remaning issues in DL Quality report | Intel Corporation | imported from 3GU |
R2‑1912860 | Remaning issues on the support of 5GCN connectivity | Intel Corporation | imported from 3GU |
R2‑1912861 | Remaining issues in RRC inactive state | Intel Corporation | imported from 3GU |
R2‑1912862 | Additional issues in D-PUR in RRC_IDLE | Intel Corporation | imported from 3GU |
R2‑1912863 | Non-BL UE operation in standalone deployment | Intel Corporation | imported from 3GU |
R2‑1912864 | Introduction of Rel-16 eMTC enhancements | Intel Corporation | imported from 3GU |
R2‑1912865 | Remaining FFSs on enabling the UE to camp on non-best cell | Intel Corporation | imported from 3GU |
R2‑1912866 | Remaining issues related to random access procedure | Intel Corporation | imported from 3GU |
R2‑1912867 | Non-BL UE in normal and enhanced coverage | Intel Corporation | imported from 3GU |
R2‑1912868 | Considerations for Geographical Zone Design for NR V2X | InterDigital | imported from 3GU |
R2‑1912869 | RAN2 Aspects of HARQ for NR V2X | InterDigital | imported from 3GU |
R2‑1912870 | LCP for NR V2X | InterDigital | imported from 3GU |
R2‑1912871 | Remaining Aspects of UL/SL Prioritization | InterDigital | imported from 3GU |
R2‑1912872 | Multiple SL Configured Grants and UE Assistance | InterDigital | imported from 3GU |
R2‑1912873 | Handling Multiple Unicast Links in NR V2X | InterDigital | imported from 3GU |
R2‑1912874 | RLM/RLF for NR V2X | InterDigital | imported from 3GU |
R2‑1912875 | RAN2 Aspects of Simultaneous Configuration of Mode 1 and Mode 2 | InterDigital | imported from 3GU |
R2‑1912876 | Draft LS on Handling of Multiple Unicast Links | InterDigital | imported from 3GU |
R2‑1912877 | Admission Control for NR SL | InterDigital, Ericsson, MediaTek, CATT, ITL, Xiaomi, Fraunhofer, LG | imported from 3GU |
R2‑1912878 | QoS-Based SLRB Establishment Decision | InterDigital | imported from 3GU |
R2‑1912879 | Remaining Aspects of Fast MCG Link Recovery using SRB3 | InterDigital | imported from 3GU |
R2‑1912880 | Summary of Email Discussion [107#32]NR/DCCA] MCG Scell/SCG Resume | InterDigital | imported from 3GU |
R2‑1912881 | On Combining RUDI and CHO | InterDigital | imported from 3GU |
R2‑1912882 | Conditional PSCell addition/change | InterDigital | imported from 3GU |
R2‑1912883 | Intra-UE Prioritization for overlapping PUSCHs | InterDigital | imported from 3GU |
R2‑1912884 | Handling of deprioritized PDUs in MAC | InterDigital | imported from 3GU |
R2‑1912885 | Intra UE prioritization between SR and PUSCH | InterDigital | imported from 3GU |
R2‑1912886 | Scheduling enhancements for TSC traffic | InterDigital | imported from 3GU |
R2‑1912887 | Paging procedure in NR-U | InterDigital | imported from 3GU |
R2‑1912888 | Random access in NR-U | InterDigital | imported from 3GU |
R2‑1912889 | Handling UL LBT Failures in MAC | InterDigital | imported from 3GU |
R2‑1912890 | CAPC selection for Configured grant transmission in NR-U | InterDigital | imported from 3GU |
R2‑1912891 | Impact of non-numeric K1 value on DRX Timers | InterDigital | imported from 3GU |
R2‑1912892 | RLM and RLF for NR-U | InterDigital | imported from 3GU |
R2‑1912893 | Correction on field description of cellReselectionInfoCommon | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1912894 | DRX considerations for preconfigured resources | Sequans Communications | imported from 3GU |
R2‑1912895 | Remaining FFSs for ANR report in NB-IoT | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912896 | Remaining issues for D-PUR in IDLE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912897 | Signalling aspects for accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912898 | Other issues related to accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912899 | Correction of cell reselection parameters for multi-beam operation | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1912900 | TP for accurate reference timing delivery in TSC | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1912901 | Remaining issues for EHC in TSC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912902 | Support of eDRX in CM-CONNECTED with RRC_INACTIVE for 5GC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912903 | User plane solutions for connecting to 5GC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912904 | Some remaining issues for Msg4-based MT-EDT | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912905 | Remaining issues of quality report for non-anchor access | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912906 | Remaining issues for DL quality report for eMTC | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912907 | Other remaining issues of UE grouping for WUS | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912908 | Remaining issue of non-BL UE enhancement | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1912909 | Discussion on configuration of CHO | China Telecommunications | imported from 3GU |
R2‑1912910 | Simulations on PDCCH-WUS not applying to the DRX short cycles | Xiaomi Communications | imported from 3GU |
R2‑1912911 | Avoid ping pong state transition for sidelink UE | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1912912 | Discussion on details of PDCP for DAPS | China Telecommunications | imported from 3GU |
R2‑1912913 | Remaining issue for prioritization for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912914 | Considerations on QoS based resource pool for NR V2X | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912915 | Further discussion on scheduling enhancement for TSN traffic | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912916 | Paging probability information based UE grouping | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912917 | Consideration on WUS configuration | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1912918 | Discussion on PDCCH-WUS missing problems during BWP switching and handover | Xiaomi Communications | imported from 3GU |
R2‑1912919 | Some issues on the PDCCH-WUS working with C-DRX | Xiaomi Communications | imported from 3GU |
R2‑1912920 | Considerations on UE power saving for BWP scenarios | Xiaomi Communications | imported from 3GU |
R2‑1912921 | PRACH prioritization parameters for MPS for Rel-16 | Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | imported from 3GU |
R2‑1912922 | PRACH prioritization procedure for MPS | Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | imported from 3GU |
R2‑1912923 | Grouping and Automatic Reconfiguration for Handover Enhancement in LEO NTN | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912924 | Left issues in idle and inactive mode for NPN | CMCC | imported from 3GU |
R2‑1912925 | Left issues in active mode for NPN | CMCC | imported from 3GU |
R2‑1912926 | Further consideration on HARQ configuration in NTN | CMCC,Huawei,Sony, KT Corp. | imported from 3GU |
R2‑1912927 | Analysis on RAN1 LS on propagation delay compensation | CMCC | imported from 3GU |
R2‑1912928 | Support on TSN periodicities of non-integer multiple CG-SPS periodicities | CMCC | imported from 3GU |
R2‑1912929 | Draft LS on support of the activation DCI of Type 2 CGs/SPS to adjust the start offset | CMCC | imported from 3GU |
R2‑1912930 | Repetitions Transmission for SPS configurations | CMCC | imported from 3GU |
R2‑1912931 | Down selection on the PDCP Duplication MAC CE Structure | CMCC | imported from 3GU |
R2‑1912932 | Further discussion on fast HO failure recovery in NR | CMCC | imported from 3GU |
R2‑1912933 | Handling of deprioritized transmissions | CMCC | imported from 3GU |
R2‑1912934 | Handling for CG resource collision of equal priority | CMCC | imported from 3GU |
R2‑1912935 | BAP mapping support for routing | CMCC | imported from 3GU |
R2‑1912936 | BWP and sub-band switching for NR-U in RACH | CMCC | imported from 3GU |
R2‑1912937 | Further consideration on consistent LBT failures | CMCC | imported from 3GU |
R2‑1912938 | Consideration on further CP enhancements for NR-U | CMCC | imported from 3GU |
R2‑1912939 | Differentiating steerable and moving cells of LEO | CMCC | imported from 3GU |
R2‑1912940 | Using beam footprint information for GEO mobility | CMCC | imported from 3GU |
R2‑1912941 | Impact analysis of NR CA frame timing relaxation | CMCC | imported from 3GU |
R2‑1912942 | Further consideration on PRACH prioritization | CMCC | imported from 3GU |
R2‑1912943 | Discussion on the flexible configuration of Maximum Data Rate Enumeration for UP Integrity Protection | CMCC | imported from 3GU |
R2‑1912944 | Mobility-state-based cell reselection in NR for HSDN | CMCC, MediaTek Inc | imported from 3GU |
R2‑1912945 | Discussion on LCP restriction enhancements for DG | CMCC | imported from 3GU |
R2‑1912946 | Discussion on fast handover failure recovery | CMCC | imported from 3GU |
R2‑1912947 | HARQ feedback for MsgB | CMCC | imported from 3GU |
R2‑1912948 | PUSCH segmentation and repetition | CMCC | imported from 3GU |
R2‑1912949 | Discussion of the PUSCH transmission of MsgA | CMCC | imported from 3GU |
R2‑1912950 | Handling of de-prioritized MAC PDU | CMCC | imported from 3GU |
R2‑1912951 | Discussion on IE design of TimeReferenceInfo used for IIOT | CMCC | imported from 3GU |
R2‑1912952 | [DRAFT] LS to SA3 on privacy concern of transmission of CAG ID | CMCC | imported from 3GU |
R2‑1912953 | Discussion of primary path configuration for PDCP duplication | CMCC | imported from 3GU |
R2‑1912954 | Further discussion on RA type selection | CMCC | imported from 3GU |
R2‑1912955 | System information for 2-step RACH resources configuration | CMCC | imported from 3GU |
R2‑1912956 | [107#49][NR L2 measurement] Running TS38.314 | CMCC | imported from 3GU |
R2‑1912957 | Draft TS 38.314 v002 | CMCC | imported from 3GU |
R2‑1912958 | TP for TS 38.314 on number of Ues | CMCC | imported from 3GU |
R2‑1912959 | Discussion on power saving in inter-frequency measurements | CMCC | imported from 3GU |
R2‑1912960 | Further consideration on EN-DC cell reselection | CMCC | imported from 3GU |
R2‑1912961 | Discussion on support of NR RAN sharing | CMCC | imported from 3GU |
R2‑1912962 | Running TS 37.320 CR | CMCC | imported from 3GU |
R2‑1912963 | LS on Logged Measurements | CMCC | imported from 3GU |
R2‑1912964 | Broadcast Handover in LEO-Satellite based NTN | Mediatek India Technology Pvt. | imported from 3GU |
R2‑1912965 | Consideration on further CP enhancements for NR-U | CMCC | imported from 3GU |
R2‑1912966 | Report of email discussion: [107#44][LTE and NR /feMOB] Discussion on PDCP details for RUDI HO | Mediatek Inc., Huawei, | imported from 3GU |
R2‑1912967 | PRACH prioritization parameters for MCS for Rel-16 | FirstNet, Perspecta Labs, Ericsson, Qualcomm | imported from 3GU |
R2‑1912968 | Bearer handling for RUDI during HO with DAPS | Mediatek Inc., Intel Corporation, Qualcomm Incorporated,Charter Communications, Apple | imported from 3GU |
R2‑1912969 | PRACH prioritization procedure for MCS for Rel-16 | FirstNet, Perspecta Labs, Ericsson, Qualcomm | imported from 3GU |
R2‑1912970 | RLC Impacts analysis with DAPS during HO | Mediatek Inc. | imported from 3GU |
R2‑1912971 | PDCP Duplication Configuration | Mediatek Inc. | imported from 3GU |
R2‑1912972 | Discussion on the use case of CHO failure recovery | Beijing Xiaomi Software Tech | imported from 3GU |
R2‑1912973 | Service continuity between TN and NTN | NEC Telecom MODUS Ltd. | imported from 3GU |
R2‑1912974 | Clarification on RSSI and Channel Occupancy measurement in LAA | Qualcomm Incorporated | imported from 3GU |
R2‑1912975 | Clarification on RSSI and Channel Occupancy measurement in LAA | Qualcomm Incorporated | imported from 3GU |
R2‑1912976 | Clarification on RSSI and Channel Occupancy measurement in LAA | Qualcomm Incorporated | imported from 3GU |
R2‑1912977 | Location based mobility enhancement | NEC Telecom MODUS Ltd. | imported from 3GU |
R2‑1912978 | Downstream Next hop ID design | NEC Telecom MODUS Ltd. | imported from 3GU |
R2‑1912979 | End to end reliability in IAB | NEC Telecom MODUS Ltd. | imported from 3GU |
R2‑1912980 | Flow control in IAB | NEC Telecom MODUS Ltd. | imported from 3GU |
R2‑1912981 | IAB backhaul RLF handling | NEC Telecom MODUS Ltd. | imported from 3GU |
R2‑1912982 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912983 | Applicability of CHO agreements to conditional PSCell change | NEC | imported from 3GU |
R2‑1912984 | Configuration of fast MCG recovery | NEC | imported from 3GU |
R2‑1912985 | Pcompensation and FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912986 | Clarification on PO calculation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912987 | Paging in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912988 | Consecutive failed connection attempts in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912989 | Details of early measurement configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912990 | Early measurements and Inter-RAT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912991 | UE capabilities for early measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912992 | Dormant behaviour | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912993 | Aspects of MCGFailureInformation over SRB3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912994 | CR on how to introduce x-scheduling with different numerologies | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912995 | Multiple SMTC for Idle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912996 | CR on multiple SMTC for idle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1912997 | PDCP uplink transmit operation for split-bearer | Qualcomm Incorporated | imported from 3GU |
R2‑1912998 | Reselection to a Cell with Valid Dedicated Frequency Offset | MediaTek Inc, LG Electronics | imported from 3GU |
R2‑1912999 | Reselection to a Cell with Valid Dedicated Frequency Offset | MediaTek Inc., LG Electronics | imported from 3GU |
R2‑1913000 | Mobility Failure Handling with Conditional Handover Candidates | MediaTek Inc. | imported from 3GU |
R2‑1913001 | Measurement Report for Conditional Handover Procedures | MediaTek Inc. | imported from 3GU |
R2‑1913002 | Power Saving for RRM Measurements in NR | MediaTek Inc. | imported from 3GU |
R2‑1913003 | CN Type Indication for Cell Reselection from NR to LTE | MediaTek Inc. | imported from 3GU |
R2‑1913004 | Considerations on IAB multi connectivity | KDDI Corporation | imported from 3GU |
R2‑1913005 | Discussion on reselection between NPNs and public networks | KDDI Corporation | imported from 3GU |
R2‑1913006 | PDU format for msgB | Huawei, HiSilicon | imported from 3GU |
R2‑1913007 | msgA resource configuration and selection | Huawei, HiSilicon | imported from 3GU |
R2‑1913008 | Discussion on the MsgA transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1913009 | Discussion on MsgB reception | Huawei, HiSilicon | imported from 3GU |
R2‑1913010 | fallback procedure for 2-step RACH | Huawei, HiSilicon | imported from 3GU |
R2‑1913011 | Differentiation for two-step random access | Huawei, HiSilicon | imported from 3GU |
R2‑1913012 | MAC aspects of BFR on SCell | Ericsson | imported from 3GU |
R2‑1913013 | Analysis of RRC impacts from multi-beam enhancements | Ericsson | imported from 3GU |
R2‑1913014 | Addition of indication for successful Random access procedure | Ericsson | imported from 3GU |
R2‑1913015 | UE capabilities for CHO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913016 | UE capabilities for RUDI handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913017 | Report for email discussion [107#26] [NR/R15] SMTC setting in MR-DC PSCell change (Nokia) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913018 | SMTC setting in MR-DC PSCell change | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913019 | Clarification regarding the supportedSRS-TxPortSwitch capability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913020 | Importing consequences if not approved from RAN1 and RAN4 excel files | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913021 | Importing feature index numbers from TR 38.822 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913022 | On FR2 CA fall-backs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913023 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913024 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913025 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913026 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913027 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913028 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913029 | UL LBT failure handling | Huawei, HiSilicon | imported from 3GU |
R2‑1913030 | Configured grant for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913031 | Discussion on DRX for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913032 | Impacts of Cross-COT HARQ feedback to BWP and SCell | Huawei, HiSilicon | imported from 3GU |
R2‑1913033 | RAR format and contention resolution for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913034 | PRACH and msg3 for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913035 | Enhancement on 2-step RACH for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913036 | Conditional PSCell addition and change | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913037 | Consideration on DL positioning method in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1913038 | Discussion on broadcasting of positioning assistance data | Huawei, HiSilicon | imported from 3GU |
R2‑1913039 | Consideration on UL positioning method in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1913040 | Consideration on Multi-RTT positioning in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1913041 | Consideration on E-CID in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1913042 | Further discussion on on-demand SI in RRC_CONNECTED | Huawei, HiSilicon | imported from 3GU |
R2‑1913043 | Remaining issue on scheduling ehancement for TSN | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913044 | Considerations on support of split bearer in the case of PDCP duplication with multiple copies | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913045 | Discussion on UE based PDCP Duplication activationdeactivation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913046 | Consideration on the multiplexing BSR MAC CE and URLLC data | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913047 | Consideration on HARQ conflict between configured grant and dynamic grant | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913048 | Considerations on Beam failure Recovery for SCell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913049 | Consideration on Enhancement of TCI state for Multi-TRP transmission | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913050 | Remaining issues on the impact from WUS signal | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913051 | Discussion on the ambiguity in calculation of RA-RNTI | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913052 | Discussion on human-readable network name | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1913053 | DL PDCP handling for RLC AM | NEC | imported from 3GU |
R2‑1913054 | DL PDCP handling for RLC UM | NEC | imported from 3GU |
R2‑1913055 | Capability coordination for DAPS based handover | NEC | imported from 3GU |
R2‑1913056 | Behaviours when handover configuration exceeds UE capabilities | NEC | imported from 3GU |
R2‑1913057 | Failure handling and RLF report for CHO | NEC | imported from 3GU |
R2‑1913058 | Discussion on human-readable network name | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1913059 | Introduction of RRC parameters and UE capabilities for enhanced high speed scenario | NTT DOCOMO INC. | imported from 3GU |
R2‑1913060 | Discussion on human-readable network name | China Telecom, Huawei, HiSilicon | imported from 3GU |
R2‑1913061 | Paging opportunities overlapping for the NR-U | ITRI | imported from 3GU |
R2‑1913062 | Msg1 transmission opportunities | ITRI | imported from 3GU |
R2‑1913063 | Backhaul RLF handling | ITRI | imported from 3GU |
R2‑1913064 | Handling of consistent UL LBT failures during HO | ITRI | imported from 3GU |
R2‑1913065 | Trigger Conditions for low-latency IAB Uplink Scheduling | ITRI | imported from 3GU |
R2‑1913066 | Introduction of UE capabilities for further performance enhancement for LTE in high speed scenario in Rel-16 | CMCC, Huawei, HiSilicon, NTTDOCOMO, INC. | imported from 3GU |
R2‑1913067 | Clarification of PDCCH monitoring period with non-zero DRX-startoffset for NB-IoT | NTT DOCOMO INC. | imported from 3GU |
R2‑1913068 | Discussion on phase of the LTE CHO procedure | China Telecommunications | imported from 3GU |
R2‑1913069 | Discussion on the deployment for CAG | China Telecommunications | imported from 3GU |
R2‑1913070 | Discussion on the deployment for CAG | China Telecommunications | imported from 3GU |
R2‑1913071 | Further consideration on D-PUR aspect | III | imported from 3GU |
R2‑1913072 | Discussion on MDT in DC scenario | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913073 | MDT activation for INACTIVE&IDLE mode UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913074 | Immediate MDT continuity upon handover procedure | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913075 | Discussion on out-of-coverage measurement and report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913076 | Restriction on MDT measurement and report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913077 | Discussion on RLF & CEF report | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913078 | Further consideration on RACH optimization | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913079 | Further consideration on INACTIVE UE counting | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913080 | Correction on the definition of over-the-air delay in UL | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913081 | Discussion on PRB usage of a cell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913082 | Enhancement on RACH procedure for SI request | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913083 | Further consideration on MAC enhancements | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913084 | Handling of de-prioritized MAC PDUs | III | imported from 3GU |
R2‑1913085 | Consideration on UL low-latency scheduling | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1913086 | Pre-emptive BSR in multiple connection scenario | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1913087 | Cell selection for IAB RLF recovery | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1913088 | RLF notification to downstream IAB node | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1913089 | Failure handling with CHO candidate | Lenovo, Motorola Mobility | imported from 3GU |
R2‑1913090 | Further consideration on On demand SI in RRC_CONNECTED | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913091 | Handling of De-prioritized MAC PDUs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913092 | Remaining Issues for Resource Conflicts Involving SR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913093 | On Primary Path of PDCP Duplication | Nokia, Nokia Shanghai Bell, NTT Docomo, Samsung, CATT, NEC, III, Qualcomm, Lenovo | imported from 3GU |
R2‑1913094 | MAC CE Format and Network Coordination for Uplink PDCP Duplication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913095 | Introduction of additional enhancements for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1913096 | WUS grouping design overview and UE distribution | Qualcomm Incorporated | imported from 3GU |
R2‑1913097 | Non-anchor carrier measurements for RRM | Qualcomm Incorporated | imported from 3GU |
R2‑1913098 | Support for UE specific DRX in NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1913099 | Draft LS on UE specific DRX in NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1913100 | Introduction of additional enhancements for eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1913101 | Outstanding issues and TP for ETWS/CMAS support by non-BL UE | Qualcomm Incorporated | imported from 3GU |
R2‑1913102 | TP for downlink channel quality reporting in MSG3 for eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1913103 | Open issues and TP for ETWS/CMAS support by non-BL UE | Qualcomm Incorporated | imported from 3GU |
R2‑1913104 | On efficient transition from RRC_CONNECTED to RRC_IDLE/RRC_INACTIVE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913105 | On UE assistance for C-DRX configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913106 | Dedicated RRM Measurement Relaxation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913107 | Further details on WUS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913108 | Further details on RRM measurement relaxation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913109 | On adaptation of maximum number of MIMO layers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913110 | On combined RRC procedures | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1913111 | RRC processing delays for combined procedures | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1913112 | Remaining issues in Msg4-based MT EDT | Ericsson | imported from 3GU |
R2‑1913113 | Scheduling enhancements for LTE-MTC and NB-IoT | Ericsson | imported from 3GU |
R2‑1913114 | MPDCCH performance improvement for LTE-M | Ericsson | imported from 3GU |
R2‑1913115 | ETWS/CMAS notification delivery in connected mode for non-BL UEs in CE | Ericsson | imported from 3GU |
R2‑1913116 | S-Criterion interpretation for non-BL UEs | Ericsson | imported from 3GU |
R2‑1913117 | Cell Reselection improvement for LTE-M Standalone cells | Ericsson | imported from 3GU |
R2‑1913118 | Remaining issues for UP solution and 5GC | Ericsson | imported from 3GU |
R2‑1913119 | PUR periodicity and UE multiplexing | Ericsson | imported from 3GU |
R2‑1913120 | PUR with DCI scheduling | Ericsson | imported from 3GU |
R2‑1913121 | PUR data transmission - remaining open issues | Ericsson | imported from 3GU |
R2‑1913122 | PUR configuration - remaining open issues | Ericsson | imported from 3GU |
R2‑1913123 | PDCP type when connecting LTE-M and NB-IoT to 5GC | Ericsson | imported from 3GU |
R2‑1913124 | Discussion on leftover issues of Inter-RAT measurement | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1913125 | Discusion on the SRVCC capability | Huawei, HiSilicon | imported from 3GU |
R2‑1913126 | Running CR for the introduction of SRVCC from 5G to 3G | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1913127 | Discussion on SL radio link management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913128 | Report buffer status with one padding byte | Google Inc. | imported from 3GU |
R2‑1913129 | Additional opportunity for Msg1 in 4-step RACH | LG Electronics Inc. | imported from 3GU |
R2‑1913130 | Problems in BFD-inspired detection mechanism for consistent UL LBT failures | LG Electronics Inc. | imported from 3GU |
R2‑1913131 | Dynamic DL opportunity enhancement based on channel busy level in NR-U | LG Electronics Inc. | imported from 3GU |
R2‑1913132 | Measurement enhancement for channel occupancy | LG Electronics Inc. | imported from 3GU |
R2‑1913133 | Periodicity misalignment between TSN traffic and SPS/CG | LG Electronics Inc. | imported from 3GU |
R2‑1913134 | LCP enhancements for mapping between LCH and CG | LG Electronics Inc. | imported from 3GU |
R2‑1913135 | Measurement gap skipping for TSN traffic | LG Electronics Inc. | imported from 3GU |
R2‑1913136 | Impact of intra-UE prioritization on SR cancellation | LG Electronics Inc. | imported from 3GU |
R2‑1913137 | Discussion on beam failure recovery for SCell | LG Electronics Inc. | imported from 3GU |
R2‑1913138 | Need for fast transition to RRC_IDLE | LG Electronics Inc. | imported from 3GU |
R2‑1913139 | Consideration on UE assistance information | LG Electronics Inc. | imported from 3GU |
R2‑1913140 | Discussion on the impact of WUS on drx-onDurationTimer | LG Electronics Inc. | imported from 3GU |
R2‑1913141 | Consideration on PDCCH-based power saving signals | LG Electronics Inc. | imported from 3GU |
R2‑1913142 | Consideration on dormancy behavior | LG Electronics Inc. | imported from 3GU |
R2‑1913143 | Confirmation MAC CE for multiple CG configurations | LG Electronics Inc. | imported from 3GU |
R2‑1913144 | Discussion on HARQ and RNTI design for msgB | imported from 3GU | |
R2‑1913145 | Discussion on simultaneous connectivity in CHO | vivo | imported from 3GU |
R2‑1913146 | Even further views on NR V2X System Information | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913147 | Unresolved issues on SL and UL prioritization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913148 | On NR V2X Sidelink transmissions during Handover or Uu PHY layer problems | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913149 | On PC5 capability transfer and link management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913150 | Network Based Monitoring and Reporting of QoS parameters for NR V2X Sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913151 | On RRC Reconfigurations in CHO-prepared state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913152 | On RRC processing and CHO command compliance check | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913153 | Failure handling in the presence of prepared CHO candidates | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913154 | Mobility Robustness for DAPS eMBB handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913155 | Further thoughts on RLF detection in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913156 | Remaining Details on UL User Data Transmission Switching in eMBB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913157 | On early data forwarding and per-DRB eMBB Handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913158 | Correction to nrofSS-BlocksToAverage and nrofCSInrofCSI-RS-ResourcesToAverage description | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913159 | Missing reportAddNeighMeas in periodic measurement reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913160 | Mobility challenges for NR V2X platooning/groupcast | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913161 | Latency reduction enhancements for SCG RACH procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1913162 | UE behavior upon consistenB2:AE10t UL LBT failures | Fujitsu | imported from 3GU |
R2‑1913163 | On PDU overwritten in NR-U configured grant | Fujitsu | imported from 3GU |
R2‑1913164 | Discussion on sidelink SR trigger | Fujitsu | imported from 3GU |
R2‑1913165 | RLM/RLF for unicast in NR V2X | Fujitsu | imported from 3GU |
R2‑1913166 | MAC CE structure for PDCP duplication activation deactivation | Fujitsu | imported from 3GU |
R2‑1913167 | NW-based per-packet PDCP duplication | Fujitsu | imported from 3GU |
R2‑1913168 | Considerations on MsgB reception | Fujitsu | imported from 3GU |
R2‑1913169 | On open questions to 2-step CF-RACH | Fujitsu | imported from 3GU |
R2‑1913170 | SR_COUNTER initialization due to RRC reconfiguration | Fujitsu, LG Electronics Inc. | imported from 3GU |
R2‑1913171 | Consideration on MAC CE design for single PDCCH based multi-TRP transmission | CMCC | imported from 3GU |
R2‑1913172 | Discussion on the flexible configuration of Maximum Data Rate Enumeration for UP Integrity Protection | CMCC, Huawei, Hisilicon | imported from 3GU |
R2‑1913173 | Further consideration on HARQ configuration in NTN | CMCC,Huawei,HiSilicon,Sony,KT Corp. | imported from 3GU |
R2‑1913174 | Service continuity and feeder link switch in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1913175 | Discussion on TA management and cell reselection in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1913176 | Discussion on inactive state in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1913177 | Running CR to TS 38.331 on IAB for NR | Ericsson | imported from 3GU |
R2‑1913178 | Draft CR to 38.331 on IAB for enhancements to existing signaling for TDD pattern configuration | Ericsson | imported from 3GU |
R2‑1913179 | Summary for Email Discussion [107#53] [NR_IAB-Core] Routing | Ericsson | imported from 3GU |
R2‑1913180 | Remaining Issues for BAP Layer | Ericsson | imported from 3GU |
R2‑1913181 | Uplink BH RLC Channel Mapping in IAB Nodes | Ericsson, KDDI | imported from 3GU |
R2‑1913182 | LCID and LCG Extension in IAB Networks | Ericsson | imported from 3GU |
R2‑1913183 | Remaining Issues Related to Flow Control | Ericsson | imported from 3GU |
R2‑1913184 | Further details for BSR in IAB Networks | Ericsson | imported from 3GU |
R2‑1913185 | On Multi-connectivity for IAB | Ericsson | imported from 3GU |
R2‑1913186 | Access Identities and Access Categories for IAB Nodes | Ericsson | imported from 3GU |
R2‑1913187 | Allowing only IAB Nodes in a Standalone NR Deployment | Ericsson | imported from 3GU |
R2‑1913188 | Backhaul link RLF Notification Types to Downstream Node(s) | Ericsson | imported from 3GU |
R2‑1913189 | Support for LTE Deployment at IAB Node Sites | Ericsson | imported from 3GU |
R2‑1913190 | Draft CR to 38.300 on IAB to add definitions for IAB-MT and IAB-DU | Ericsson | imported from 3GU |
R2‑1913191 | Correction on T322 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913192 | Correction on T322 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913193 | Correction on the actions for frequencyBandList in SIB1 and SIB2 | Ericsson, MediaTek | imported from 3GU |
R2‑1913194 | RAN2 impact of undefined Pmax for FR2 in REL-15 | Ericsson, NTT Docomo Inc. | imported from 3GU |
R2‑1913195 | Correction for P-Max in FR2 | Ericsson, NTT DOCOMO INC. | imported from 3GU |
R2‑1913196 | cDRX enhancement for CA | Ericsson, Qualcomm Inc., Samsung, Verizon, Deutsche Telekom | imported from 3GU |
R2‑1913197 | RAN2 impact of WUS in connected mode | Ericsson | imported from 3GU |
R2‑1913198 | UE assistance for RRC connection release | Ericsson | imported from 3GU |
R2‑1913199 | UE adaptation to maximum number of MIMO layers | Ericsson | imported from 3GU |
R2‑1913200 | UE Assistance Information for cDRX configuration | Ericsson | imported from 3GU |
R2‑1913201 | UE Assistance Information for SCell configuration | Ericsson | imported from 3GU |
R2‑1913202 | RRM measurement relaxation | Ericsson | imported from 3GU |
R2‑1913203 | Considerations on user plane for DAPS | Huawei, HiSilicon | imported from 3GU |
R2‑1913204 | Considerations on UE capability coordination | Huawei, HiSilicon | imported from 3GU |
R2‑1913205 | Considerations on control plane for DAPS | Huawei, HiSilicon,China Telecom | imported from 3GU |
R2‑1913206 | Problems of ROHC handling for DAPS | Huawei, HiSilicon | imported from 3GU |
R2‑1913207 | Further consideration on reply LSs from RAN1 and RAN4 | Huawei, HiSilicon,China Telecom | imported from 3GU |
R2‑1913208 | Discussion on Groupcast and Broadcast QoS Report | ITRI | imported from 3GU |
R2‑1913209 | Details of hop-by-hop flow control | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913210 | Signalling for radio aware scheduling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913211 | Discussion on number of LCIDs and LCGs for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913212 | Discussion on MAC subheader structures for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913213 | Buffer status reporting for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913214 | T_delta signalling for IAB timing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913215 | Increasing Tx opportunities for Msg1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913216 | Msg2 format and contention resolution based on LBT outcome of Msg3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913217 | RNTI design for MsgB reception | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913218 | Draft LS on MsgB RNTI design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913219 | Further design aspects of MsgB MAC subheader formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913220 | New TAC MAC CE for 2-step RACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913221 | Preamble groups for 2-step RACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913222 | CFRA for 2-step RACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913223 | BFR procedure for SCell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913224 | Candidate detection and MAC CE format for SCell BFR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913225 | Draft CR on Introduction of SCell BFR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913226 | CFRA resource handling for BFR upon TAT expiry | Nokia, Nokia Shanghai Bell, Apple | imported from 3GU |
R2‑1913227 | PDCP handling and RLC UM support for RUDI HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913228 | NR UE-based Positioning Modes and Geographical Information | ITRI | imported from 3GU |
R2‑1913229 | Clarification to CA fallback band combinations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913230 | Efficient RRC configuration with low latency | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913231 | Support of multiple LTE CRS rate matching patterns | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1913232 | Support of multiple LTE CRS rate matching patterns | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1913233 | Further consideration on EN-DC cell reselection | CMCC, Huawei, vivo, ZTE, OPPO, xiaomi | imported from 3GU |
R2‑1913234 | Conditional presence on ue-CapabilityInfo and servCellIndexRangeSCG for inter-MN handover without SN change | NTT DOCOMO, INC. | imported from 3GU |
R2‑1913235 | Prioritization between NR-UL and NR-SL | MediaTek Inc. | imported from 3GU |
R2‑1913236 | Remaining issues of SL LCP | MediaTek Inc. | imported from 3GU |
R2‑1913237 | On SL configured grant | MediaTek Inc. | imported from 3GU |
R2‑1913238 | Support of simultaneous mode 1 and mode 2 | MediaTek Inc. | imported from 3GU |
R2‑1913239 | MAC CE format for single PDCCH multi-TRP | MediaTek Inc. | imported from 3GU |
R2‑1913240 | Support BFR for SCell | MediaTek Inc. | imported from 3GU |
R2‑1913241 | Solution for intra-UE prioritization | Huawei, HiSilicon | imported from 3GU |
R2‑1913242 | Handling of de-prioritized MAC PDU due to intra-UE prioritization | Huawei, HiSilicon, SIA | imported from 3GU |
R2‑1913243 | Prioritization issues for MAC Ces | Huawei, HiSilicon, SIA | imported from 3GU |
R2‑1913244 | Activation/deactivation of PDCP duplication of up to 4 legs | Huawei, HiSilicon | imported from 3GU |
R2‑1913245 | Cell restriction for PDCP duplication with up to 4 legs | Huawei, HiSilicon | imported from 3GU |
R2‑1913246 | Configuration of early measurments by SN | Samsung Telecommunications | imported from 3GU |
R2‑1913247 | Remaining aspects on early measurement configuration | Samsung, MediaTek Incorporated, ZTE Corporation, Sanechips, Qualcomm Incorporated | imported from 3GU |
R2‑1913248 | CA/ DC enhancements, signalling reduction | Samsung Telecommunications | imported from 3GU |
R2‑1913249 | Immediate MDT, inter-node aspects | Samsung Telecommunications | imported from 3GU |
R2‑1913250 | Logged MDT, inter-node aspects (SN configuration) | Samsung Telecommunications | imported from 3GU |
R2‑1913251 | MDT for early measurments (Logged, immediate) | Samsung Telecommunications | imported from 3GU |
R2‑1913252 | General framework to harmonise transfer of UE information | Samsung Telecommunications | imported from 3GU |
R2‑1913253 | Report of email discussion [107#08][NR IAB] Running BAP CR | Huawei, HiSilicon | imported from 3GU |
R2‑1913254 | Running CR for TS 38.340 (BAP) | Huawei, HiSilicon | imported from 3GU |
R2‑1913255 | Correction on initial DL BWP and CORESET#0 | Huawei, MediaTek, HiSilicon | imported from 3GU |
R2‑1913256 | Correction on capabilities of BWP bandwidth | Huawei, HiSilicon | imported from 3GU |
R2‑1913257 | Correction on camping conditions | Huawei, HiSilicon | imported from 3GU |
R2‑1913258 | Introduction of a second SMTC per frequency carrier in idle/inactive | Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, Samsung, Ericsson | imported from 3GU |
R2‑1913259 | Periodic CSI and SRS with wake-up indication | MediaTek Inc. | imported from 3GU |
R2‑1913260 | On consistent LBT failures | MediaTek Inc. | imported from 3GU |
R2‑1913261 | RAR design for NR-U | MediaTek Inc. | imported from 3GU |
R2‑1913262 | On PHR and autonomous retransmissions | MediaTek Inc. | imported from 3GU |
R2‑1913263 | MAC behaviour for LBT failures in Msg3 transmissions | MediaTek Inc. | imported from 3GU |
R2‑1913264 | MsgB format proposal for 2-step RACH | MediaTek Inc. | imported from 3GU |
R2‑1913265 | Ethernet Header Compression Message Format | MediaTek Inc. | imported from 3GU |
R2‑1913266 | Misalignment Between TSC and SPS/CG Periodicities | MediaTek Inc. | imported from 3GU |
R2‑1913267 | Propagation Delay Compensation by the gNB | MediaTek Inc. | imported from 3GU |
R2‑1913268 | Reconfiguration with sync for NE-DC | Google Inc. | imported from 3GU |
R2‑1913269 | Introduction of a second SMTC for inter-RAT cell reselection | Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, Samsung, Ericsson | imported from 3GU |
R2‑1913270 | Reconfiguration failure in NE-DC | Google Inc. | imported from 3GU |
R2‑1913271 | Reconfiguration failure in NE-DC | Google Inc. | imported from 3GU |
R2‑1913272 | Support of releasing UL configuration | Huawei, HiSilicon, CMCC, China Telecom, MediaTek Inc., Vodafone, Orange, vivo, OPPO, Spreadtrum Communications | imported from 3GU |
R2‑1913273 | PDCP configuration generation (email discussion of 107#25) | Huawei, HiSilicon | imported from 3GU |
R2‑1913274 | Resource Pool Configuration | LG Electronics Inc. | imported from 3GU |
R2‑1913275 | NR V2X System Information Aspects | LG Electronics Inc. | imported from 3GU |
R2‑1913276 | SLRB Management in NR V2X | LG Electronics Inc. | imported from 3GU |
R2‑1913277 | Simultaneous Mode 1 and Mode 2 Configuration | LG Electronics Inc. | imported from 3GU |
R2‑1913278 | On PRS Information for NR Positioning | LG Electronics Inc. | imported from 3GU |
R2‑1913279 | Correction on the frequency indication in SIB2 | Huawei, HiSilicon | imported from 3GU |
R2‑1913280 | Correction on EUTRAN terminology | Huawei, HiSilicon | imported from 3GU |
R2‑1913281 | Remaining issues for the MAC specification | Huawei, HiSilicon | imported from 3GU |
R2‑1913282 | Correction on PRACH re-transmission for SRS carrier switching | Huawei, HiSilicon, MediaTek | imported from 3GU |
R2‑1913283 | Correction on PUSCH frequency hopping | Huawei, HiSilicon | imported from 3GU |
R2‑1913284 | Correction on synchoronous reconfiguration | Huawei, HiSilicon | imported from 3GU |
R2‑1913285 | Correction on delta signalling for handover | Huawei, HiSilicon | imported from 3GU |
R2‑1913286 | Discussion on support of NR RAN sharing | CMCC | imported from 3GU |
R2‑1913287 | Remaining issues on UL LBT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913288 | Non-numeric K1 impacts | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913289 | Multiple configured grants for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913290 | CAPC for configured grant and dynamic grant | Nokia, Nokia Shanghai Bell, Lenovo | imported from 3GU |
R2‑1913291 | Stage-2 running CR for 2-step RACH | Nokia (rapporteur), Nokia Shanghai Bell | imported from 3GU |
R2‑1913292 | Further consideration on logged MDT | CMCC | imported from 3GU |
R2‑1913293 | UE behavior upon consisten UL LBT failures | Fujitsu | imported from 3GU |
R2‑1913294 | UE behavior upon consistent UL LBT failures | Fujitsu | imported from 3GU |
R2‑1913295 | Routing details in IAB | Sony Europe B.V. | imported from 3GU |
R2‑1913296 | Summary of email discussion [107#31][NR/DCCA] MCG fast recovery | Ericsson | imported from 3GU |
R2‑1913297 | Handling of AS-Config in HandoverPreparationInformation | Ericsson | imported from 3GU |
R2‑1913298 | Corrections on scg-RB-Config in CG-Config | Ericsson | imported from 3GU |
R2‑1913299 | Correction on candidateCellInfoListSN-EUTRA in HandoverPreparationInformation | Ericsson | imported from 3GU |
R2‑1913300 | Corrections to power limitations in NE-DC | Ericsson | imported from 3GU |
R2‑1913301 | Correction of SRB3 handling at full configuration (Alt1) | Ericsson | imported from 3GU |
R2‑1913302 | Correction on MCG measurements in SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1913303 | Correction on SCGFailureInformation | Ericsson | imported from 3GU |
R2‑1913304 | Remaining issues for correction on the condition of RBTermChange | Ericsson | imported from 3GU |
R2‑1913305 | Remaining issues for correction on the condition of RBTermChange | Ericsson | imported from 3GU |
R2‑1913306 | Correction of SRB3 handling at full configuration (Alt2) | Ericsson | imported from 3GU |
R2‑1913307 | Miscellaneous correction for late drop | Ericsson | imported from 3GU |
R2‑1913308 | Correction to connection resume in EN-DC | Ericsson | imported from 3GU |
R2‑1913309 | Correction to power limitations in (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1913310 | Correction to integrity protection in DRB addition and modification | Ericsson | imported from 3GU |
R2‑1913311 | Correction on handover terminology | Ericsson | imported from 3GU |
R2‑1913312 | Correction on sending Failure Information via SRB3 | Ericsson, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1913313 | Correction on inter-node messages from CU to DU | Ericsson | imported from 3GU |
R2‑1913314 | Correction to SIB5 acquisition for idle mode measurements | Ericsson | imported from 3GU |
R2‑1913315 | Correction on inter-frequency neighbour cell measurements | Ericsson | imported from 3GU |
R2‑1913316 | Summary of email discussion [107#42][NR-Rel-16] On demand SI in connected | Ericsson | imported from 3GU |
R2‑1913317 | Running CR on on-demand SI procedure in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1913318 | Remaining issues regarding on-demand SI for Positioning | Ericsson | imported from 3GU |
R2‑1913319 | Inter-node resource coordination in NR SL | Ericsson | imported from 3GU |
R2‑1913320 | Discussion on NR SL QoS management | Ericsson | imported from 3GU |
R2‑1913321 | Discussion on SL link management | Ericsson | imported from 3GU |
R2‑1913322 | Discussion on SL cross-RAT scheduling and configurations | Ericsson | imported from 3GU |
R2‑1913323 | Discussion on SL Mode 2 left issues | Ericsson | imported from 3GU |
R2‑1913324 | Discussion on SL information reporting over Uu | Ericsson | imported from 3GU |
R2‑1913325 | Discussion on SL mode 1 left issues | Ericsson | imported from 3GU |
R2‑1913326 | Remaining issues on UL-SL prioritisation | Ericsson | imported from 3GU |
R2‑1913327 | Support on HARQ procedure over sidelink | Ericsson | imported from 3GU |
R2‑1913328 | Summary of email discussion [107#75][NR/V2X] RLF | Ericsson | imported from 3GU |
R2‑1913329 | Remaining issues on RLC AM and UM support in SL | Ericsson | imported from 3GU |
R2‑1913330 | Discussion on NR SL lower layer procedures | Ericsson | imported from 3GU |
R2‑1913331 | Running CR for 38.322 for NR V2X | Ericsson | imported from 3GU |
R2‑1913332 | Discussion on SL AS configuration request over NR Uu | Ericsson | imported from 3GU |
R2‑1913333 | Handling of capability transfer in sidelink | Ericsson | imported from 3GU |
R2‑1913334 | Handling of SL in Uu RRC state transitions | Ericsson | imported from 3GU |
R2‑1913335 | Left issues on random access procedure in NTN | OPPO | imported from 3GU |
R2‑1913336 | Discussion on DRX operation in NTN | OPPO | imported from 3GU |
R2‑1913337 | Discussion on UL scheduling enhancement in NTN | OPPO | imported from 3GU |
R2‑1913338 | Impacts of disabling HARQ on LCP | OPPO | imported from 3GU |
R2‑1913339 | Discussion on handover procedure for NTN | OPPO | imported from 3GU |
R2‑1913340 | Considerations on performing and criteria of measurement relaxation | LG Electronics | imported from 3GU |
R2‑1913341 | Considerations on reporting measurement relaxation upon access | LG Electronics | imported from 3GU |
R2‑1913342 | Handling early meaurment results upon cell reselection | LG Electronics | imported from 3GU |
R2‑1913343 | Validity area enhancements in NR | LG Electronics | imported from 3GU |
R2‑1913344 | Considerations on ways to provide SSB configuration in early measurements | LG Electronics | imported from 3GU |
R2‑1913345 | Report of email discussion [107#64][NTN] Cell selection&reselection | LG Electronics | imported from 3GU |
R2‑1913346 | Considerations on CHO in NTN | LG Electronics | imported from 3GU |
R2‑1913347 | Dual connectivity use cases in NTN | LG Electronics | imported from 3GU |
R2‑1913348 | Remaining issues of tracking area management in NTN | LG Electronics | imported from 3GU |
R2‑1913349 | TA update after PUR transmission via MAC CE | Sequans Communications | imported from 3GU |
R2‑1913350 | IAB System information handling | Sony | imported from 3GU |
R2‑1913351 | BSR enhancement for IAB | Sony | imported from 3GU |
R2‑1913352 | Handling a deprioritized PDU for uplink Intra-UE prioritization in IIoT | Sony | imported from 3GU |
R2‑1913353 | Consideration on activation/deactivation for CG Type 1 | Sony | imported from 3GU |
R2‑1913354 | Location report in NTN | Sony | imported from 3GU |
R2‑1913355 | Bulk handover signalling for mobility enhancement in NTN | Sony | imported from 3GU |
R2‑1913356 | Fallback to 4-step RACH with BI | Sony | imported from 3GU |
R2‑1913357 | HARQ support for MsgB of 2-Step RACH | Sony | imported from 3GU |
R2‑1913358 | Power Saving techniques, UE assistance information | Sony | imported from 3GU |
R2‑1913359 | UE power saving for inter frequency measurements | Sony | imported from 3GU |
R2‑1913360 | Relaxed monitoring for beam measurement | Sony | imported from 3GU |
R2‑1913361 | Details of Relaxed monitoring for NR UE power saving | Sony | imported from 3GU |
R2‑1913362 | On supporting UE-group wake-up signal for MTC/NB-IoT | Sony | imported from 3GU |
R2‑1913363 | Cell selection/reselection with NPN cells | Sony | imported from 3GU |
R2‑1913364 | Mobility enhancements for Connectivity to 5GC for MTC and NB-IoT | Sony | imported from 3GU |
R2‑1913365 | Discussion on RAT dependent NR Positioning techniques | Sony | imported from 3GU |
R2‑1913366 | Differentiating between MSG2 and MSGB | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913367 | Remaining Stage 2 issues for 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913368 | Support of CFRA with 2-step RACH | ZTE Corporation, Sanechips, Qualcomm, Fujitsu | imported from 3GU |
R2‑1913369 | Configuration aspects of 2-step RACH | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913370 | Running MAC CR for 2-step RACH | ZTE Corporation (email rapporteur) | imported from 3GU |
R2‑1913371 | RAR MAC PDU design for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913372 | Multiple Msg1 transmission opportunities for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913373 | Discussion on configured grant for NR-U | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913374 | Considerations on camping on non-best cell | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913375 | Recovery from consistent LBT failures | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913376 | Report on [107#74] QoS flow in SLRB | Apple | imported from 3GU |
R2‑1913377 | Discussion on QoS flow in SLRB | Apple | imported from 3GU |
R2‑1913378 | PC5 RRC procedure | Apple | imported from 3GU |
R2‑1913379 | Maximum Data Rate Enumeration for UP Integrity Protection | Apple, ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913380 | Draft LS on Maximum Data Rate Enumeration for UP Integrity Protection | Apple | imported from 3GU |
R2‑1913381 | SI Acquisition in Connected Mode | Apple | imported from 3GU |
R2‑1913382 | CMAS/ETWS Reception at UE Configured with eDRX | Apple | imported from 3GU |
R2‑1913383 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | Apple | imported from 3GU |
R2‑1913384 | CR to TS38.306 on FR2 intra band contiguous and non-contiguous CA fallback | Apple | imported from 3GU |
R2‑1913385 | Full configuration in inter-RAT handover | Google Inc. | imported from 3GU |
R2‑1913386 | Full configuration in inter-RAT handover | Google Inc. | imported from 3GU |
R2‑1913387 | Baseline NTN-TN service continuity and mobility mechanism | HUGHES Network Systems Ltd | imported from 3GU |
R2‑1913388 | Discussion on LCP procedure for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913389 | Introduction of voice fallback indication | Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | imported from 3GU |
R2‑1913390 | Introduction of voice fallback indication | Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | imported from 3GU |
R2‑1913391 | Draft LS on RRC establishment cause value in EPS fallback | Qualcomm Incorporated | imported from 3GU |
R2‑1913392 | CLI measurements UE capabilities | Qualcomm Incorporated | imported from 3GU |
R2‑1913393 | Too strong interference during CLI-RSSI/SRS-RSRP measurement | Qualcomm Incorporated | imported from 3GU |
R2‑1913394 | ARFCN used for security key derivation | Qualcomm Incorporated | imported from 3GU |
R2‑1913395 | DL and UL NR Positioning Procedures | Qualcomm Incorporated | imported from 3GU |
R2‑1913396 | TP for 38.305 Baseline CR: Transmission Measurement Function in NG-RAN | Qualcomm Incorporated | imported from 3GU |
R2‑1913397 | GNSS SSR Assistance Data | Qualcomm Incorporated | imported from 3GU |
R2‑1913398 | Broadcast of Location Assistance Data by NG-RAN | Qualcomm Incorporated | imported from 3GU |
R2‑1913399 | Assistance Data for DL-only UE-based mode | Qualcomm Incorporated | imported from 3GU |
R2‑1913400 | Running CR for Introduction of Even futher Mobility enhancement in E-UTRAN | Ericsson India Private Limited | imported from 3GU |
R2‑1913401 | Discussion on HARQ feedback for msgB and RNTI design for msgB | Qualcomm Incorporated | imported from 3GU |
R2‑1913402 | Prioritized 2-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1913403 | Report of email discussion [107#68] [NR/2-step RACH]: MAC PDU format for msgB | Qualcomm Incorporated | imported from 3GU |
R2‑1913404 | msgB MAC PDU format | Qualcomm Incorporated | imported from 3GU |
R2‑1913405 | Remaining issue on contention resolution and fall back procedure | Qualcomm Incorporated | imported from 3GU |
R2‑1913406 | [107#61][NR/NTN] Rapporteur Running TP | THALES | imported from 3GU |
R2‑1913407 | Enhanced TCI States Activation/Deactivation PDSCH MAC CE for Multi-TRP | Qualcomm Incorporated | imported from 3GU |
R2‑1913408 | Use case and Signaling for RSS | Ericsson | imported from 3GU |
R2‑1913409 | NRS Signalling Configuration | Ericsson | imported from 3GU |
R2‑1913410 | New SIB for hosting posSI Scheduling Information | Ericsson | imported from 3GU |
R2‑1913411 | Specify UDC Header is part of Data Field | Ericsson | imported from 3GU |
R2‑1913412 | Running CR for the introduction of NR positioning | Ericsson | imported from 3GU |
R2‑1913413 | Quality Report in eMTC Remaining Issues | Ericsson | imported from 3GU |
R2‑1913414 | Text Proposal for MAC specification on Quality Report | Ericsson | imported from 3GU |
R2‑1913415 | Introduction of additional posSIBs for QZSS PPP-RTK Phase 2 | Ericsson | imported from 3GU |
R2‑1913416 | UE-based configuration options | Ericsson | imported from 3GU |
R2‑1913417 | S-Criterion for Non anchor Carrier based NRS measurements | Ericsson | imported from 3GU |
R2‑1913418 | RSS Signalling Configuration | Ericsson | imported from 3GU |
R2‑1913419 | Remaining Issues for ANR measurements | Ericsson | imported from 3GU |
R2‑1913420 | posSIBs on a selective carrier | Ericsson | imported from 3GU |
R2‑1913421 | PosSIB Broadcast carrier | Ericsson | imported from 3GU |
R2‑1913422 | Stage-3 structure details for RAT-dependent NR positioning | Ericsson | imported from 3GU |
R2‑1913423 | RAT dependent positioning methods - architecture and protocol aspects | Ericsson | imported from 3GU |
R2‑1913424 | GNSS Integer Ambiguity Level Indications | Ericsson | imported from 3GU |
R2‑1913425 | Corrections for Positioning Architecture | Ericsson | imported from 3GU |
R2‑1913426 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | Document Rapporteur (BlackBerry) | imported from 3GU |
R2‑1913427 | CR to 38.331 on SSB-ToMeasure clarifications | Ericsson | imported from 3GU |
R2‑1913428 | CR to 36.331 on SSB-ToMeasure clarifications | Ericsson | imported from 3GU |
R2‑1913429 | CR to 36.306 on FR2 related ANR capability | Ericsson | imported from 3GU |
R2‑1913430 | CR to 36.331 on FR2 related ANR capability | Ericsson | imported from 3GU |
R2‑1913431 | CR to 38.306 on FR2 related ANR capability | Ericsson | imported from 3GU |
R2‑1913432 | CR to 38.331 on FR2 related ANR capability | Ericsson | imported from 3GU |
R2‑1913433 | CR to 36.331 on performing L3 filtering for NR related measurements | Ericsson | imported from 3GU |
R2‑1913434 | CR to 36.331on NR CGI reporting related to cellReservedForOtherUse | Ericsson | imported from 3GU |
R2‑1913435 | CR to 38.331 on NR CGI reporting related to cellReservedForOtherUse and LTE CGI reporting related to CSG cells | Ericsson | imported from 3GU |
R2‑1913436 | CR to 38.331 on A2 event definition clarification | Ericsson | imported from 3GU |
R2‑1913437 | CR to 36.331 on A2 event definition clarification | Ericsson | imported from 3GU |
R2‑1913438 | Triggering conditions for A1-A6 events in NR | Ericsson | imported from 3GU |
R2‑1913439 | CR to 38.331 on Triggering conditions for A1 to A6 events in NR | Ericsson | imported from 3GU |
R2‑1913440 | CR to 38.306 on Triggering conditions for A1 to A6 events in NR | Ericsson | imported from 3GU |
R2‑1913441 | Open issues of L2 measurements in NR | Ericsson | imported from 3GU |
R2‑1913442 | Open issues related to RACH report | Ericsson | imported from 3GU |
R2‑1913443 | Open issues related to RLF report | Ericsson | imported from 3GU |
R2‑1913444 | Successful handover report | Ericsson | imported from 3GU |
R2‑1913445 | Correction on the usage of the TCI capability | Intel | imported from 3GU |
R2‑1913446 | Clarification on the restriction of maximum SRS resource sets configuration for uplink beam management. | Intel | imported from 3GU |
R2‑1913447 | Miscellaneous corrections on UE capability fields | Intel Corporation, NTT DoCoMo | imported from 3GU |
R2‑1913448 | Discussion on some open issues in running MAC CR | Email discussion rapporteur (ZTE Corporation) | imported from 3GU |
R2‑1913449 | Summary of running MAC CR review issue list | ZTE Corporation (email disc Rapporteur) | imported from 3GU |
R2‑1913450 | Updated Work Plan for NR Industrial IoT WI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913451 | Remaining issues for accurate reference time delivery | Nokia, Nokia Shanghai Bell, NTT DOCOMO | imported from 3GU |
R2‑1913452 | Periodicity and burst arrival encoding in TSCAI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913453 | Support for arbitrary TSC message periodicities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913454 | CG and SPS occasions determination for new periodicities | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913455 | SPS collisions with multiple SPS configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913456 | Padding removal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913457 | Joint IP and Ethernet Header compression | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913458 | LCP restrictions enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913459 | Route priority and local routing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913460 | BH link failure handling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913461 | IAB initial access and IAB support indication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913462 | Routing and mapping configuration in IAB nodes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913463 | IAB-MT terminology | Nokia, Nokia Shanghai Bell, Vodafone | imported from 3GU |
R2‑1913464 | Admission control for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913465 | Revisions of usage scenarios for NTN | THALES | imported from 3GU |
R2‑1913466 | SSB-ToMeasure related clarification | Ericsson LM | imported from 3GU |
R2‑1913467 | On Layer 2 parameter values to support delay critical GBR QoS flows | Huawei, HiSilicon | imported from 3GU |
R2‑1913468 | Solutions to mitigate the periodicity misalignment between TSC traffic and CG/SPS | Huawei, HiSilicon | imported from 3GU |
R2‑1913469 | Remaining issues of LCP enhancement for TSC traffic | Huawei, HiSilicon | imported from 3GU |
R2‑1913470 | Propagation delay compensation for accurate reference timing | Huawei, HiSilicon | imported from 3GU |
R2‑1913471 | Remaining issues of reference time delivery | Huawei, HiSilicon | imported from 3GU |
R2‑1913472 | Further discussion on Configured Grant Confirmation MAC CE | Huawei, HiSilicon | imported from 3GU |
R2‑1913473 | Discussion on EHC header format | Huawei, HiSilicon | imported from 3GU |
R2‑1913474 | Paging for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913475 | SI enhancement for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913476 | Discussion on multiplexing of data | Huawei, HiSilicon | imported from 3GU |
R2‑1913477 | Discussion on DL LBT failure impact on RLF triggering | Huawei, HiSilicon | imported from 3GU |
R2‑1913478 | Further discussion on PLMN selection for NR-U | Huawei, HiSilicon | imported from 3GU |
R2‑1913479 | Consistent LBT failure detection | Google Inc. | imported from 3GU |
R2‑1913480 | CAPC for configured grants in NR-U | Google Inc. | imported from 3GU |
R2‑1913481 | Correction to RRCReconfigurationComplete in NR-DC | Ericsson | imported from 3GU |
R2‑1913482 | Clarification on security key change and bearer termination point change | ZTE Corporation, Ericsson, Intel | imported from 3GU |
R2‑1913483 | Further issues for CHO configuration and execution | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913484 | Discussion on fast RLF recovery when applying CHO and fast MCG recovery | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913485 | Discussion on conditional PSCell addition/change | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913486 | Discussion on capability coordination for RUDI HO | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913487 | Remaining Issues on Early Measurements | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913488 | On Inter-RAT Operation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913489 | On directly donfiguring SCell as activated | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913490 | Further Consideration on fast SCell activation | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913491 | On SCG suspension | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913492 | Signalling overhead reduction for cell configuration and BWP configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913493 | UE positioning in legacy satellite communication systems for 5G NTN | THALES | imported from 3GU |
R2‑1913494 | Discussion on SDAP protocol for NR V2X | Apple | imported from 3GU |
R2‑1913495 | Discussion on prioritization between SL BSR and UL BSR | Apple, OPPO | imported from 3GU |
R2‑1913496 | Discussion on remaining issues on HARQ feedback | Apple | imported from 3GU |
R2‑1913497 | Draft LS on Support HARQ feedback design for SL groupcast | Apple | imported from 3GU |
R2‑1913498 | UE Mobility for Simultaneous Mode 1 & Mode 2 configuration | Apple | imported from 3GU |
R2‑1913499 | Resource allocations for UEs with simultaneous mode 1 & mode 2 configurations | Apple | imported from 3GU |
R2‑1913500 | Improved transmission mechanism for PUCCH-UCI | Ericsson | imported from 3GU |
R2‑1913501 | Discussions on configured grant in NR-U | Ericsson | imported from 3GU |
R2‑1913502 | Further discussions on channel access priority | Ericsson | imported from 3GU |
R2‑1913503 | DRX enhancement for NR-U | Ericsson | imported from 3GU |
R2‑1913504 | Handling LBT failures | Ericsson | imported from 3GU |
R2‑1913505 | RACH enhancements for NR-U | Ericsson | imported from 3GU |
R2‑1913506 | RAN2 impact of supporting wideband operation | Ericsson | imported from 3GU |
R2‑1913507 | Channel access for Msg3 | Ericsson | imported from 3GU |
R2‑1913508 | 2-step Random Access for NR-U | Ericsson | imported from 3GU |
R2‑1913509 | Running MAC CR for NR-U | Ericsson | imported from 3GU |
R2‑1913510 | PC5-RRC and PC5-S interactions and their security in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1913511 | Discussion on mode 1 resource allocation | Qualcomm Incorporated | imported from 3GU |
R2‑1913512 | Inter-RAT resource allocation in NR V2X | Qualcomm Incorporated | imported from 3GU |
R2‑1913513 | Timing of Key Derivation in Conditional Handover | Futurewei | imported from 3GU |
R2‑1913514 | Draft LS on the Timing of AS Key Derivation in Conditional Handover | Futurewei | imported from 3GU |
R2‑1913515 | Handling of Key Derivation in Conditional PSCell Addition/Change | Futurewei | imported from 3GU |
R2‑1913516 | Correction to secondary key derivation | Ericsson | imported from 3GU |
R2‑1913517 | Miscellaneous corrections to 38.306 | Ericsson | imported from 3GU |
R2‑1913518 | Correction to field conditions in NE-DC | Ericsson | imported from 3GU |
R2‑1913519 | Addition of dynamic power sharing for NE-DC (38.306) | Ericsson | imported from 3GU |
R2‑1913520 | Addition of dynamic power sharing for NE-DC | Ericsson | imported from 3GU |
R2‑1913521 | Clarification to radio bearer handling for intra-5GC HO from LTE to NR (38.331) | Ericsson | imported from 3GU |
R2‑1913522 | Clarification to radio bearer handling for intra-5GC HO from NR to LTE (36.331) | Ericsson | imported from 3GU |
R2‑1913523 | Correction on capability coordination terminology (37.340) | Ericsson | imported from 3GU |
R2‑1913524 | Correction to Feature Set Combinations for NR-DC (38.331) | Ericsson | imported from 3GU |
R2‑1913525 | Handling of fallback band combinations | Ericsson, NTT DOCOMO | imported from 3GU |
R2‑1913526 | [DRAFT] Reply LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 | Ericsson | imported from 3GU |
R2‑1913527 | Introducing multiple BC-FS | Ericsson | imported from 3GU |
R2‑1913528 | Returning multiple BC+FS in CG-Config | Ericsson | imported from 3GU |
R2‑1913529 | Overheating enhancements for EN-DC | Ericsson | imported from 3GU |
R2‑1913530 | Use of group signaling for NR-CA | Ericsson | imported from 3GU |
R2‑1913531 | Further RRC impact due to dormancy behaviour | Ericsson | imported from 3GU |
R2‑1913532 | Email Discussion [107#27][NR/R15] Determining L2 buffer size (Ericsson) | Ericsson | imported from 3GU |
R2‑1913533 | LS on NR V2X synchronization procedures and priority (R1-1909910; contact: CATT) | RAN1 | imported from 3GU |
R2‑1913534 | Clarification on satellite beam and PCI mapping | THALES | imported from 3GU |
R2‑1913535 | Draft CR on CLI for TS 38.306 | Ericsson(rapporteur) | imported from 3GU |
R2‑1913536 | Remaining issues on CLI | Ericsson | imported from 3GU |
R2‑1913537 | On s measure for CLI | Ericsson | imported from 3GU |
R2‑1913538 | Open Issues for IAB Routing | Futurewei Technologies | imported from 3GU |
R2‑1913539 | Enhancements for low-latency IAB Uplink scheduling | Futurewei Technologies | imported from 3GU |
R2‑1913540 | Miscellaneous non-controversial corrections Set IV | Ericsson | imported from 3GU |
R2‑1913541 | Definition of NR standalone | Ericsson | imported from 3GU |
R2‑1913542 | Presence and absence of TAC in NR cell | Ericsson | imported from 3GU |
R2‑1913543 | On Scell AddMod and Release lists | Ericsson | imported from 3GU |
R2‑1913544 | Backhaul RLF Notification and Recovery Procedure | Futurewei Technologies | imported from 3GU |
R2‑1913545 | Logged MDT for RRC_INACTIVE state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913546 | Logged MDT configuration events | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913547 | Impact of SNPN on PLMN check for MDT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913548 | RACH Scenarios and their presence in the RACH Report | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913549 | RACH Fallback from NUL to SUL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913550 | TP to 38.300 on SON support | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913551 | Counting number of inactive Ues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913552 | Measurement event for interference-forced inter-RAT/inter-freq HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913553 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913554 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913555 | MAC Scheduling Aspects of Multi-TTI Grant | Qualcomm Incorporated | imported from 3GU |
R2‑1913556 | Impact of ACK/NACK transmission to NR-U DRX | Qualcomm Incorporated | imported from 3GU |
R2‑1913557 | Report for [107#51][NR IAB] F1 over LTE (AT&T) | AT&T | imported from 3GU |
R2‑1913558 | Impact of non-Numeric K1 Value to NR-U DRX | Qualcomm Incorporated | imported from 3GU |
R2‑1913559 | Paging monitoring in NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1913560 | Remaining FFS on cell reselection for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1913561 | DRX Active Time for NR-U | Qualcomm Incorporated | imported from 3GU |
R2‑1913562 | CAPC and uplink transmission | Qualcomm Incorporated | imported from 3GU |
R2‑1913563 | Clarification on satellite beam and PCI mapping | THALES, ERICSSON | imported from 3GU |
R2‑1913564 | On SL HARQ configuration for NR V2X | Intel Corporation | imported from 3GU |
R2‑1913565 | Correction to Pcompensation for FR2 | Huawei, HiSilicon | imported from 3GU |
R2‑1913566 | Correction to the parameter descriptions for cell measurement quallity derivation in multi-beam operation | Huawei, HiSilicon | imported from 3GU |
R2‑1913567 | Correction to the field description of cellReselectionInfoCommon for cell measurement quallity derivation in multi-beam operation | Huawei, HiSilicon | imported from 3GU |
R2‑1913568 | Remaining issues on time domain measurement relaxation | Huawei, HiSilicon | imported from 3GU |
R2‑1913569 | Reducing the number of neighbour cells/carriers to measure | Huawei, HiSilicon | imported from 3GU |
R2‑1913570 | Remaining issues of DL quality report | Huawei, HiSilicon | imported from 3GU |
R2‑1913571 | MPDCCH performance improvement using CRS | Huawei, HiSilicon | imported from 3GU |
R2‑1913572 | Enhancements to idle mode mobility for non-BL UEs | Huawei, HiSilicon | imported from 3GU |
R2‑1913573 | Use of RSS for measurement improvements | Huawei, HiSilicon | imported from 3GU |
R2‑1913574 | NR-U specific aspects for 2-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1913575 | Running RRC CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1913576 | Running Idle/Inactive mode CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1913577 | Clarification on SRB3 usage | ZTE Corporation | imported from 3GU |
R2‑1913578 | Correction of RRC procedure upon expiry of DataInactivityTimer | Qualcomm Incorporated | imported from 3GU |
R2‑1913579 | Draft LS on RRC indication to NAS upon expiry of DataInactivityTimer | Qualcomm Incorporated | imported from 3GU |
R2‑1913580 | Methods of Paging in GEO Satellite-Based 5G Networks | HUGHES Network Systems Ltd | imported from 3GU |
R2‑1913581 | On uplink enhancements for NTN | Ericsson | imported from 3GU |
R2‑1913582 | DRX adaptions for NTN | Ericsson | imported from 3GU |
R2‑1913583 | Remaining aspects on Random access for NTN | Ericsson | imported from 3GU |
R2‑1913584 | Remaining aspects on RLC and PDCP | Ericsson | imported from 3GU |
R2‑1913585 | Satellite identifier in 3GPP NTN Control Plane | THALES | imported from 3GU |
R2‑1913586 | Remaining issues regarding UE assistance information | Samsung, Ericsson | imported from 3GU |
R2‑1913587 | Correction of UE assistance information | Samsung, Ericsson | imported from 3GU |
R2‑1913588 | Correction of UE assistance information | Samsung, Ericsson | imported from 3GU |
R2‑1913589 | Clarification regarding QoS handling in MRDC with 5G CN | Samsung, ZTE Corporation | imported from 3GU |
R2‑1913590 | CHO configuration/ execution, remaining aspects | Samsung Telecommunications | imported from 3GU |
R2‑1913591 | Introducing condition for SN (re-)configurations | Samsung Telecommunications | imported from 3GU |
R2‑1913592 | Capability coordination for DAPS, required UE capability details and signalling | Samsung Telecommunications | imported from 3GU |
R2‑1913593 | Angle of Departure UE positioning technique | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913594 | On-demand and dynamic PRS configuration for DL-TDOA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913595 | PC5 groupcast handling | Qualcomm Incorporated | imported from 3GU |
R2‑1913596 | RRC Framework for handling MN failure indication and recovery over SRB3 | Intel Corporation | imported from 3GU |
R2‑1913597 | Pre-configured UL Resources Design Considerations | Sierra Wireless, S.A., Sony Mobile Communications, Gemalto N.V. | imported from 3GU |
R2‑1913598 | Recommended Bit Rate/Query for FLUS and MTSI | Qualcomm Incorporated | imported from 3GU |
R2‑1913599 | [Draft] Reply LS on Recommended Bit Rate/Query for FLUS and MTSI | Qualcomm Incorporated | imported from 3GU |
R2‑1913600 | Remaining aspects from [106#61] D-PUR Request, (re)configuration and release mechanism | Qualcomm Incorporated | imported from 3GU |
R2‑1913601 | Introduction of Rel-16 eMTC enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑1913602 | Addressing Editor's Notes and FFSes in RRC running CR | Qualcomm Incorporated | imported from 3GU |
R2‑1913603 | Conditional measurement configuration for LEO NTN | InterDigital | imported from 3GU |
R2‑1913604 | Summary of Email Discussion [107_62] TP Mobility (InterDigital) | InterDigital | imported from 3GU |
R2‑1913605 | TP on NTN Mobility Issues and Solutions | InterDigital | imported from 3GU |
R2‑1913606 | Further considerations for the WUS | InterDigital | imported from 3GU |
R2‑1913607 | Discussion on the SN modification trigger | Huawei, HiSilicon | imported from 3GU |
R2‑1913608 | Draft reply LS on full configuration during SN Modification procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1913609 | Further issues of not up-to-date SN configuration at handover | Huawei, HiSilicon | imported from 3GU |
R2‑1913610 | Exchanging used IDs of SN terminated DRBs | Huawei, HiSilicon | imported from 3GU |
R2‑1913611 | Exchanging used IDs of SN terminated DRBs | Huawei, HiSilicon | imported from 3GU |
R2‑1913612 | Sending FailureInformation message on SRB3 | Huawei, HiSilicon | imported from 3GU |
R2‑1913613 | Clarification on SRB3 release | Huawei, HiSilicon | imported from 3GU |
R2‑1913614 | sk-counter presence in RRC(Connection)Reconfiguration | Huawei, HiSilicon | imported from 3GU |
R2‑1913615 | Idle/inactive NR measurements in LTE and in NR | Huawei, HiSilicon | imported from 3GU |
R2‑1913616 | UE capabilities for DC and CA enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑1913617 | Handling of primaryPath when fast MCG link recovery via split SRB1 fails | Huawei, HiSilicon | imported from 3GU |
R2‑1913618 | Discussion on dormancy-like behaviour | Huawei, HiSilicon | imported from 3GU |
R2‑1913619 | RAN2 specification impacts of multi-TRP transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1913620 | MAC CE signalling enhancement for TCI indication of single-PDCCH based multi-TRP transmission | Huawei, HiSilicon | imported from 3GU |
R2‑1913621 | Beam failure recovery for SCell | Huawei, HiSilicon | imported from 3GU |
R2‑1913622 | Configured Grant enhancements for TSC traffic | Sequans Communications | imported from 3GU |
R2‑1913623 | BSR operation with CA packet duplication | Sequans Communications | imported from 3GU |
R2‑1913624 | Handling of collisions with a CG | Sequans Communications | imported from 3GU |
R2‑1913625 | Enhanced rescheduling for dropped CG | Sequans Communications | imported from 3GU |
R2‑1913626 | On Inter-RAT assistance information for NB-IoT and LTE(-eMTC) | Sequans Communications | imported from 3GU |
R2‑1913627 | NB-IoT UE Specific DRX Support | Sequans Communications | imported from 3GU |
R2‑1913628 | IAB with NSA operation | Sequans Communications | imported from 3GU |
R2‑1913629 | Support for LTE deployment at IAB node sites | Sequans Communications | imported from 3GU |
R2‑1913630 | F1-U Flow Control and Reordering Issues | Sequans Communications | imported from 3GU |
R2‑1913631 | Queue Management vs Flow Control for Congestion Handling | Sequans Communications | imported from 3GU |
R2‑1913632 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1913633 | Report of email discussion [107#40][NR/NPN] SIB1 design (Qualcomm) | Qualcomm Incorporated | imported from 3GU |
R2‑1913634 | Suitable and acceptable NPN cells | Qualcomm Incorporated | imported from 3GU |
R2‑1913635 | Support for NPN HRNN broadcast | Qualcomm Incorporated | imported from 3GU |
R2‑1913636 | DRAFT LS on granularity of periodicity and burst arrival time in TSCAI | Qualcomm Incorporated | imported from 3GU |
R2‑1913637 | TSCAI Encoding: Granularity of burst arrival time and periodicity | Qualcomm Incorporated | imported from 3GU |
R2‑1913638 | MAC CE structure for PDCP duplication enhancement | Qualcomm Incorporated | imported from 3GU |
R2‑1913639 | Value of UE-based PDCP duplication | Qualcomm Incorporated | imported from 3GU |
R2‑1913640 | PDCP duplication enhancements and RLC AM | Qualcomm Incorporated | imported from 3GU |
R2‑1913641 | Views on handling of PDUs and data of deprioritized grants | Qualcomm Incorporated | imported from 3GU |
R2‑1913642 | LCP restriction enhancements for Industrial IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1913643 | Reference timing delivery determination by RAN | Qualcomm Incorporated | imported from 3GU |
R2‑1913644 | Principles for EHC header design | Qualcomm Incorporated | imported from 3GU |
R2‑1913645 | Discussion of RAN1 LS on propagation delay compensation and way forward | Qualcomm Incorporated | imported from 3GU |
R2‑1913646 | More granularity for PDCP discardTimer | Qualcomm Incorporated | imported from 3GU |
R2‑1913647 | Extended MAC CE ID | Qualcomm Incorporated | imported from 3GU |
R2‑1913648 | Draft LS on signalling of reference timing delivery determination information | Qualcomm Incorporated | imported from 3GU |
R2‑1913649 | Remaining Issues on Persistent LBT Failures in NRU | Charter Communications, Inc | imported from 3GU |
R2‑1913650 | Considerations on T312 enhancements for fast RLF recovery in NR | Potevio | imported from 3GU |
R2‑1913651 | Paging Monitoring in NR-U | Charter Communications, Inc | imported from 3GU |
R2‑1913652 | On NR-U Operation in DFS Channels | Charter Communications, Inc | imported from 3GU |
R2‑1913653 | System Information Transmission Enhancements in NR-U | Charter Communications, Inc | imported from 3GU |
R2‑1913654 | Consideration of preemptive BSR in IAB | Kyocera | imported from 3GU |
R2‑1913655 | Further discussion on Backhaul RLF handling | Kyocera | imported from 3GU |
R2‑1913656 | Inter-node interaction for Conditional PScell addition/change | CATT | imported from 3GU |
R2‑1913657 | Draft LS on Conditional PSCell addition_change | CATT | imported from 3GU |
R2‑1913658 | Logged MDT for NR-DC and EN-DC | Kyocera | imported from 3GU |
R2‑1913659 | Recovery due to LBT failures | Kyocera | imported from 3GU |
R2‑1913660 | PC5-RRC state considerations | Kyocera | imported from 3GU |
R2‑1913661 | PC5 L2/L3 protocols for unicast and groupcast | Kyocera | imported from 3GU |
R2‑1913662 | Some Considerations on intra-UE data-data prioritization | China Telecommunications | imported from 3GU |
R2‑1913663 | channelBWs parameter and legacy channel bandwidths | Sprint Corporation | imported from 3GU |
R2‑1913664 | LCP restrictions for configured grant | Intel Corporation | imported from 3GU |
R2‑1913665 | SL RLF handling | Qualcomm Incorporated | imported from 3GU |
R2‑1913666 | Access restrictions (barring) in IAB | Sharp | imported from 3GU |
R2‑1913667 | Skipping supportedBandCombinationList of n90 | KDDI Corporation | imported from 3GU |
R2‑1913668 | Validity of CHO configurations based on security configuration | Sharp | imported from 3GU |
R2‑1913669 | NE-DC dynamic power sharing capability | Qualcomm Incorporated | imported from 3GU |
R2‑1913670 | NE-DC dynamic power sharing capability | Qualcomm Incorporated | imported from 3GU |
R2‑1913671 | Clarification on essential system information acquisition | Qualcomm Incorporated | imported from 3GU |
R2‑1913672 | Security Algorithms for all Radio Bearer in NR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1913673 | Correction on the Msg3 based on demand system information | Huawei, HiSilicon | imported from 3GU |
R2‑1913674 | Enhancement on BSR format for the one LCG case | Huawei, HiSilicon | imported from 3GU |
R2‑1913675 | Discussion on a configuration mismatch between a UE and a target gNB | KDDI Corporation | imported from 3GU |
R2‑1913676 | Discussion of Guarantee PDCP Duplication Transmission | III | imported from 3GU |
R2‑1913677 | LTE Mobility Robustness Enhancements for DAPS eMBB HO | Qualcomm Incorporated | imported from 3GU |
R2‑1913678 | Clarification on informative timer table | Huawei, HiSilicon | imported from 3GU |
R2‑1913679 | DL data delivery for Msg4 fallback case | LG Electronics UK | imported from 3GU |
R2‑1913680 | Draft LS on MT data delivery in MT EDT | LG Electronics UK | imported from 3GU |
R2‑1913681 | FFS issues on D-PUR | LG Electronics UK | imported from 3GU |
R2‑1913682 | Discussion on D-PUR request and TA validity check | LG Electronics UK | imported from 3GU |
R2‑1913683 | Paging response usign D-PUR | LG Electronics UK | imported from 3GU |
R2‑1913684 | Support for S-PUR | LG Electronics UK | imported from 3GU |
R2‑1913685 | Clarification for aggregated bandwidth for overheating | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1913686 | Correction on procedural text for appliedFreqBandListFilter | Huawei, HiSilicon | imported from 3GU |
R2‑1913687 | Clarification on the feature set report in EUTRAN | Huawei, HiSilicon | imported from 3GU |
R2‑1913688 | Corrections on PDCCH blind decoding in NR-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1913689 | Signalling design for overheating reporting in (NG)EN-DC scenario | Huawei, Huawei Device, China Unicom, MediaTek Inc., Samsung, LG Uplus, vivo | imported from 3GU |
R2‑1913690 | 36.331 Draft CR for addressing overheating issue in EN-DC scenario - Option 1 | Huawei, Huawei Device | imported from 3GU |
R2‑1913691 | 38.331 Draft CR for addressing overheating issue in EN-DC sceanrio - Option 1 | Huawei, Huawei Device | imported from 3GU |
R2‑1913692 | 36.331 Draft CR for addressing overheating issue in EN-DC scenario - Option 2 | Huawei, Huawei Device | imported from 3GU |
R2‑1913693 | 37.340 Draft CR for addressing overheating issue in EN-DC scenario - Option 2 | Huawei, Huawei Device | imported from 3GU |
R2‑1913694 | 38.331 Draft CR for addressing overheating issue in EN-DC scenario - Option 2 | Huawei, Huawei Device | imported from 3GU |
R2‑1913695 | CR on UE capability for SRS-Tx switch | Huawei, HiSilicon | imported from 3GU |
R2‑1913696 | Summary on email discussion 107#05 BWCS for inter-ENDC BC with intra-ENDC BC | Huawei, HiSilicon | imported from 3GU |
R2‑1913697 | Clarification on description for mandatory capability without capability signalling | Huawei, HiSilicon | imported from 3GU |
R2‑1913698 | Running CR to 36 331 for NR V2X | Huawei, HiSilicon | imported from 3GU |
R2‑1913699 | TP on NR V2X for TR 37.985 RAN2 parts | Huawei, HiSilicon | imported from 3GU |
R2‑1913700 | Discussion about mode coexistence for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1913701 | Discussion on HARQ support for NR sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1913702 | Discussion on Sidelink Configured Grant support | Huawei, HiSilicon | imported from 3GU |
R2‑1913703 | Further details of UE assistance information procedure for NR SL | Huawei, HiSilicon | imported from 3GU |
R2‑1913704 | Further discussion on inter-RAT resource allocation | Huawei, HiSilicon | imported from 3GU |
R2‑1913705 | Identifier assignment to enable Option2 groupcast HARQ | Huawei, HiSilicon | imported from 3GU |
R2‑1913706 | Discussion on related aspects of system information | Huawei, HiSilicon | imported from 3GU |
R2‑1913707 | Discussion on remaining issues of SR and BSR for SL Mode 1 | Huawei, HiSilicon | imported from 3GU |
R2‑1913708 | Further details of Uu RRC procedures for sidelink | Huawei, HiSilicon | imported from 3GU |
R2‑1913709 | Further discussion on NR SL and NR UL prioritization | Huawei, HiSilicon | imported from 3GU |
R2‑1913710 | Relationship between PC5-RRC connection and PC5-S connection | Huawei, HiSilicon | imported from 3GU |
R2‑1913711 | Remaining issue on sidelink LCP procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1913712 | Remaining issues on SLRB configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1913713 | Support of RLC AM for Sidelink unicast | Huawei, HiSilicon | imported from 3GU |
R2‑1913714 | Introduction of cross link interfernce management | Huawei, HiSilicon | imported from 3GU |
R2‑1913715 | Leftover issues on CLI | Huawei, HiSilicon | imported from 3GU |
R2‑1913716 | Introduction of wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1913717 | Introduction of wideband PRG size | Huawei, HiSilicon | imported from 3GU |
R2‑1913718 | Discussion on UDC reconfiguration for RRC connection reestablishment case | Huawei, HiSilicon | imported from 3GU |
R2‑1913719 | UDC reconfiguration for RRC connection re-establishment case | Huawei, HiSilicon | imported from 3GU |
R2‑1913720 | UDC reconfiguration for RRC connection re-establishment case | Huawei, HiSilicon | imported from 3GU |
R2‑1913721 | Discussion on providing CAG ID to AS during resume procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1913722 | draft Reply LS to CTI on providing CAG ID to AS during resume procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1913723 | Open issue of uplink MDBV enforcement | Huawei, HiSilicon | imported from 3GU |
R2‑1913724 | Postponed discussions on potential improvements for delay critical QoS flows | Huawei, HiSilicon | imported from 3GU |
R2‑1913725 | Draft Reply LS on potential improvements for delay critical QoS flows | Huawei, HiSilicon | imported from 3GU |
R2‑1913726 | Draft CR for 36.323 on supporting DAPS handover | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1913727 | Draft CR for 38.323 on supporting DAPS handover | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1913728 | Draft LS on UL data forwarding and COUNT initialization | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1913729 | Corrections on the reconfiguration with sync | Huawei, HiSilicon | imported from 3GU |
R2‑1913730 | Corrections on the PDCP duplication (de)activation | Huawei, HiSilicon | imported from 3GU |
R2‑1913731 | Corrections on the condition of PDCP for split SRB | Huawei, HiSilicon | imported from 3GU |
R2‑1913732 | Discussion on SFTD measurement based on RAN1 LS | Huawei, HiSilicon | imported from 3GU |
R2‑1913733 | [draft] Reply LS to RAN1 on SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R2‑1913734 | Discussion on adding CSI-RS inter-node message | Huawei, HiSilicon, China Telecom | imported from 3GU |
R2‑1913735 | DRX configuration coordination in (NG)EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1913736 | CR to 36.331 on CGI information | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1913737 | CR to 38.331 on CGI information | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1913738 | L2 impacts on supporting IIoT traffic | NTT DOCOMO, INC. | imported from 3GU |
R2‑1913739 | [DRAFT] Reply LS to SA3 on FBS detection | Huawei, HiSilicon | imported from 3GU |
R2‑1913740 | Discussion on potential RAN2 impact to support false base station detection | Huawei, HiSilicon | imported from 3GU |
R2‑1913741 | HO and redirection from NR to LTE due to EPS fallback | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1913742 | NR group specific cell configuration | Huawei, HiSilicon | imported from 3GU |
R2‑1913743 | RAN2 impact to support cross-carrier scheduling with different numerologies | Huawei, HiSilicon | imported from 3GU |
R2‑1913744 | Clarification on RAN2 impact to support DL HARQ timing for dual UL EN-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1913745 | Other recovery mechanisms for MCG fast recovery | Huawei, HiSilicon | imported from 3GU |
R2‑1913746 | Recovery for deprioritized data transmission | NTT DOCOMO, INC. | imported from 3GU |
R2‑1913747 | Remaining issues on CLI | LG Electronics Inc | imported from 3GU |
R2‑1913748 | draft CR on CLI for TS38 331_v3_Alt1 | LG Electronics Inc | imported from 3GU |
R2‑1913749 | draft CR on CLI for TS38 331_v3_Alt2 | LG Electronics Inc | imported from 3GU |
R2‑1913750 | Cell (re)selection after consecutive UL LBT failures | LG Electronics Inc | imported from 3GU |
R2‑1913751 | Remaining issues on camping on non-best cell | LG Electronics Inc | imported from 3GU |
R2‑1913752 | RLMRLF in NR-U | LG Electronics Inc | imported from 3GU |
R2‑1913753 | RSSI and channel occupancy measurements for serving frequency | LG Electronics Inc | imported from 3GU |
R2‑1913754 | SI change indicaiton in RRC_CONNECTED | LG Electronics Inc | imported from 3GU |
R2‑1913755 | Discussion on per beam number of active UEs measurement | NTT DOCOMO INC. | imported from 3GU |
R2‑1913756 | MAC PDU format of Success RAR | ETRI | imported from 3GU |
R2‑1913757 | RRC release after EDT for User Plane CIoT EPS optimization | Ericsson | imported from 3GU |
R2‑1913758 | RRC release after EDT for User Plane CIoT EPS optimization | Ericsson | imported from 3GU |
R2‑1913759 | Redundant retransmission in PDCP duplication | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1913760 | Handling of RLC stuck problem with PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1913761 | MAC CE format for PDCP duplication activation/deactivation | LG Electronics Inc. | imported from 3GU |
R2‑1913762 | ON Duration adaptation | LG Electronics Inc. | imported from 3GU |
R2‑1913763 | Reduced PDCCH monitoring in CA | LG Electronics Inc. | imported from 3GU |
R2‑1913764 | On the consideration of routing for reporting pre-emptive BSR | ASUSTeK | imported from 3GU |
R2‑1913765 | Discussion on traditional uplink and IAB uplink traffic for BSR triggering | ASUSTeK | imported from 3GU |
R2‑1913766 | SR configuration for pre-emptive BSR | ASUSTeK | imported from 3GU |
R2‑1913767 | Discussion on SCCH configuration | ASUSTeK | imported from 3GU |
R2‑1913768 | Discussion on handling multiple SL communication | ASUSTeK | imported from 3GU |
R2‑1913769 | Discussion on resource allocation for sidelink HARQ ACK/NACK report | ASUSTeK | imported from 3GU |
R2‑1913770 | Discussion on sidelink RLM indication | ASUSTeK | imported from 3GU |
R2‑1913771 | Discussion on requesting and releasing SLRB configuration | ASUSTeK | imported from 3GU |
R2‑1913772 | Discussion on association between sidelink data and resource allocation modes | ASUSTeK | imported from 3GU |
R2‑1913773 | DRX timer operation in multi-TB scheduling | ASUSTeK | imported from 3GU |
R2‑1913774 | Buffer status indicated by BSR in multi-TB scheduling | ASUSTeK | imported from 3GU |
R2‑1913775 | Remaining issues of D-PUR TA timer | ASUSTeK | imported from 3GU |
R2‑1913776 | Group WUS | Ericsson | imported from 3GU |
R2‑1913777 | Discussion on UE location information in SCG failure report | NTT DOCOMO INC. , Ericsson | imported from 3GU |
R2‑1913778 | Discussion on groupcast HARQ in NR SL | LG Electronics Inc. | imported from 3GU |
R2‑1913779 | Discussion on HARQ enable and disable | LG Electronics Inc. | imported from 3GU |
R2‑1913780 | Discussion on measurement and report in NR SL | LG Electronics Inc. | imported from 3GU |
R2‑1913781 | Discussion on remaining issues of mode 1 operation | LG Electronics Inc. | imported from 3GU |
R2‑1913782 | Discussion on SFTD measurement between NR PSCell and NR neighbour cells in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913783 | Correction on parameter description of beamManagementSSB-CSI-RS in 38.306 | Huawei, HiSilicon | imported from 3GU |
R2‑1913784 | Random access without UE location information | Huawei, HiSilicon | imported from 3GU |
R2‑1913785 | Random access with UE location information | Huawei, HiSilicon | imported from 3GU |
R2‑1913786 | RACH resource configuration and utilization in NTN | Huawei, HiSilicon | imported from 3GU |
R2‑1913787 | Further discussion on the impact of PDCCH-WUS | Huawei, HiSilicon | imported from 3GU |
R2‑1913788 | Discussion on efficient RRC state transition | Huawei, HiSilicon | imported from 3GU |
R2‑1913789 | Further discussion on the MIMO layer adaptation | Huawei, HiSilicon | imported from 3GU |
R2‑1913790 | UE assistance information in MR-DC | Huawei, Huawei Device, CMCC, MediaTek Inc., China Telecom, vivo | imported from 3GU |
R2‑1913791 | Service continuity between terrestrial network (TN) and non-terrestrial network (NTN) | HUGHES Network Systems Ltd | imported from 3GU |
R2‑1913792 | Problems in Evaluation of CHO Execution Condition | ETRI | imported from 3GU |
R2‑1913793 | Combination of CHO and RUDI Handover | ETRI | imported from 3GU |
R2‑1913794 | Faster Handover Failure Recovery | ETRI | imported from 3GU |
R2‑1913795 | PDCP/RLC Re-establishment in DAPS Handover | ETRI | imported from 3GU |
R2‑1913796 | Data Forwarding Options and Interruption Time | ETRI | imported from 3GU |
R2‑1913797 | Bye Message for RUDI Handover | ETRI | imported from 3GU |
R2‑1913798 | Source Cell Release in DAPS Handover | ETRI | imported from 3GU |
R2‑1913799 | Control plane management during/after DAPS HO | LG Electronics France | imported from 3GU |
R2‑1913800 | On the need of earlier packet forwarding | LG Electronics France | imported from 3GU |
R2‑1913801 | Access copntrol in IAB networks | LG Electronics France | imported from 3GU |
R2‑1913802 | F1AP over LTE | LG Electronics France | imported from 3GU |
R2‑1913803 | Resolving open issues on BH RLF | LG Electronics France | imported from 3GU |
R2‑1913804 | Resue of CSG features for NPN cells | LG Electronics France | imported from 3GU |
R2‑1913805 | Handling of RLC stuck problem with PDCP duplication | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1913806 | ON Duration adaptation | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1913807 | Use of range parameter | MediaTek Inc. | imported from 3GU |
R2‑1913808 | Remaining issues in SDAP layer | MediaTek Inc. | imported from 3GU |
R2‑1913809 | Inter-RAT BSR | MediaTek Inc. | imported from 3GU |
R2‑1913810 | Discussion on local decision make for routing | Samsung | imported from 3GU |
R2‑1913811 | UL mapping configuration | Samsung | imported from 3GU |
R2‑1913812 | Further discussions on bearer mapping configuration for CP and UP | Samsung | imported from 3GU |
R2‑1913813 | Upstream BH link RLF notification | Samsung | imported from 3GU |
R2‑1913814 | Clarification on the using of RRCSetup | Huawei, HiSilicon | imported from 3GU |
R2‑1913815 | LCID space extension and MAC format | LG Electronics Inc. | imported from 3GU |
R2‑1913816 | Consideration on LCG space extension | LG Electronics Inc. | imported from 3GU |
R2‑1913817 | LCG based UL grant | LG Electronics Inc. | imported from 3GU |
R2‑1913818 | BSR MAC CE format for pre-BSR | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1913819 | Further details for DL flow control | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1913820 | Consideration on local route selection in IAB node | LG Electronics Inc. | imported from 3GU |
R2‑1913821 | BAP layer configuration for data forwarding | LG Electronics Inc. | imported from 3GU |
R2‑1913822 | Way forward for CP bearer mapping | LG Electronics Inc. | imported from 3GU |
R2‑1913823 | Retransmission of an RLC SDU with a poll after discard procedure | LG Electronics Inc. | imported from 3GU |
R2‑1913824 | Running CR to 36.321 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1913825 | Running CR to 38.321 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1913826 | Layer-1 and Layer 2 Identifiers for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1913827 | Proposed LS on Layer-1 and Layer 2 Identifiers for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1913828 | Delivery of PC5-S Signaling and PC5-RRC messages | LG Electronics Inc. | imported from 3GU |
R2‑1913829 | Proposed LS on PC5-S Signaling for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1913830 | PC5-RRC connection and procedures with PC5-S and Uu RRC | LG Electronics Inc. | imported from 3GU |
R2‑1913831 | Report of email discussion [107#57][NB-IoT eMTC R16] WUS configuration | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1913832 | RRC release for User Plane EDT | III | imported from 3GU |
R2‑1913833 | Procedures and MAC CE design for BFR for SCells | Qualcomm Incorporated | imported from 3GU |
R2‑1913834 | Clarification on measurement gap for LTE inter-RAT measurement in NR SA | MediaTek Inc., Nokia (Rapporteur) | imported from 3GU |
R2‑1913835 | Discussion on early measurement configuration upon state transition | MediaTek Inc. | imported from 3GU |
R2‑1913836 | Discussion on performing ROHC | LG Electronics Inc. | imported from 3GU |
R2‑1913837 | Need for Primary path | LG Electronics Inc., LG Uplus | imported from 3GU |
R2‑1913838 | Discussion on LCH-to-Cell restriction for PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1913839 | PDCP SN gap issue in fast MCG link recovery | LG Electronics Inc. | imported from 3GU |
R2‑1913840 | Handling of RLF for eMOB | LG Electronics Inc. | imported from 3GU |
R2‑1913841 | Discussion on PDCP impacts for eMOB/feMOB | LG Electronics Inc. | imported from 3GU |
R2‑1913842 | When to apply the target network configurations | LG Electronics Inc. | imported from 3GU |
R2‑1913843 | Dicussion on RUDI HO for UM DRB | LG Electronics Inc. | imported from 3GU |
R2‑1913844 | Scheduling enhancement in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1913845 | Integrity verification and PDCP duplication | LG Electronics Inc. | imported from 3GU |
R2‑1913846 | Extension of the LCID | LG Electronics Inc. | imported from 3GU |
R2‑1913847 | Report of [107#81][NR TEI16] Need-for-Gaps signalling | MediaTek Inc. | imported from 3GU |
R2‑1913848 | Discussion on de-prioritized MAC PDU on CG resource | LG Electronics Polska, LG Uplus | imported from 3GU |
R2‑1913849 | Broadcast of TBS assistance data | NextNav, AT&T, FirstNet, Polaris Wireless | imported from 3GU |
R2‑1913850 | Broadcast of TBS assistance data | NextNav, AT&T, FirstNet, Polaris Wireless | imported from 3GU |
R2‑1913851 | Correction to mobility from NR | Google Inc. | imported from 3GU |
R2‑1913852 | Discussion on multiple active CGs for NR-U | LG Electronics Polska | imported from 3GU |
R2‑1913853 | CR on NeedForGap capability for each supported NR band before EN-DC configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913854 | Discussion on contention resolution timer in NR-U | LG Electronics Polska | imported from 3GU |
R2‑1913855 | Discussion on L2 measurement in EN-DC | NTT DOCOMO INC. | imported from 3GU |
R2‑1913856 | Considerations on simultaneous configuration of mode 1 and 2 | ITL | imported from 3GU |
R2‑1913857 | Correction to mobility from E-UTRA | Google Inc. | imported from 3GU |
R2‑1913858 | Discussion on MAC PDU overwritten issue | LG Electronics Polska | imported from 3GU |
R2‑1913859 | Discussion and Decision | LG Electronics | imported from 3GU |
R2‑1913860 | Consideration of CHO Configuration Update | LG Electronics Inc. | imported from 3GU |
R2‑1913861 | Draft LS on CHO Configuration Update | LG Electronics Inc. | imported from 3GU |
R2‑1913862 | Consideration on Invalid Cell Handling in CHO | LG Electronics Inc. | imported from 3GU |
R2‑1913863 | ReportConifg ID for CHO Condition | LG Electronics Inc. | imported from 3GU |
R2‑1913864 | Handling Excess of UE Capability in DAPS HO | LG Electronics Inc. | imported from 3GU |
R2‑1913865 | RLM Handling of Enhanced MBB HO | LG Electronics Inc. | imported from 3GU |
R2‑1913866 | Signalling Delay in NTN | LG Electronics Inc. | imported from 3GU |
R2‑1913867 | Consideration on Default SLRB | ITL | imported from 3GU |
R2‑1913868 | Sidelink HARQ retransmission in mode 1 | ITL | imported from 3GU |
R2‑1913869 | Discussion on DRX operation associated with disabling HARQ feedback | LG Electronics Polska | imported from 3GU |
R2‑1913870 | RNTI design for msgB | LG Electronics Inc. | imported from 3GU |
R2‑1913871 | Discussion on the flow control | ITL | imported from 3GU |
R2‑1913872 | Remaining issues on 2-step random access resource | LG Electronics | imported from 3GU |
R2‑1913873 | Remaining issue on NR SL QoS and SLRB configurations | ITL | imported from 3GU |
R2‑1913874 | MAC PDU formats for msgB | LG Electronics Polska | imported from 3GU |
R2‑1913875 | Need for RAPID MAC CE in payload of msgA | LG Electronics Inc. | imported from 3GU |
R2‑1913876 | Common delay for initial access | ETRI | imported from 3GU |
R2‑1913877 | Logical channel based RA type selection | LG Electronics Inc. | imported from 3GU |
R2‑1913878 | MAC impacts of multiple CCAs in wide band operation | LG Electronics Polska | imported from 3GU |
R2‑1913879 | Consideration on 2-step CFRA | LG Electronics | imported from 3GU |
R2‑1913880 | Draft LS on SCell BFR Operation | Apple | imported from 3GU |
R2‑1913881 | Handling of new flow when the number of stored contexts are already equal to the MAX_CID | SHARP Corporation | imported from 3GU |
R2‑1913882 | On RLC UM for RUDI HO | SHARP Corporation | imported from 3GU |
R2‑1913883 | On voice fallback enhancement | SHARP Corporation | imported from 3GU |
R2‑1913884 | Remaining issue on PC5 RLM/RLF | LG Electronics Inc. | imported from 3GU |
R2‑1913885 | Discussion on PC5 RRC Connection | LG Electronics Inc. | imported from 3GU |
R2‑1913886 | Discussion on assistance information for resource allocation in NR SL | LG Electronics Inc. | imported from 3GU |
R2‑1913887 | Running CR to 38.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1913888 | L4S support in 5G | Ericsson, Vodafone, Nokia, Nokia Shanghai Bell, Sprint | imported from 3GU |
R2‑1913889 | New BSR trigger for EN-DC | Ericsson | imported from 3GU |
R2‑1913890 | Clarification to CSI reporting in C-DRX | Qualcomm Inc | imported from 3GU |
R2‑1913891 | Correction to PHR in dual connectivity | Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1913892 | Configuration aspects of wakeup signaling | Qualcomm Inc | imported from 3GU |
R2‑1913893 | Cross cell group wakeup message in MR-DC | Qualcomm Inc, Futurewei | imported from 3GU |
R2‑1913894 | UE indication on expected data | Qualcomm Inc, Apple | imported from 3GU |
R2‑1913895 | Backoff indication in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1913896 | Enhancements to PHR in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1913897 | Clarification to CSI reporting in C-DRX | Qualcomm Inc | imported from 3GU |
R2‑1913898 | Correction to PHR in dual connectivity | Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R2‑1913899 | Configuration aspects of wakeup signaling | Qualcomm Inc | imported from 3GU |
R2‑1913900 | Cross cell group wakeup message in MR-DC | Qualcomm Inc, Futurewei | imported from 3GU |
R2‑1913901 | UE indication on expected data | Qualcomm Inc, Apple | imported from 3GU |
R2‑1913902 | Backoff indication in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1913903 | Enhancements to PHR in multi-beam operation | Qualcomm Inc | imported from 3GU |
R2‑1913904 | Discussion on Fast failure recovery alternatives to WA | Samsung Electronics Polska | imported from 3GU |
R2‑1913905 | Discussion on Remaining issues related to T312 | Samsung Electronics Polska | imported from 3GU |
R2‑1913906 | DISC_Resume_procedure_CAG_ID | Samsung Electronics Polska | imported from 3GU |
R2‑1913907 | L2 Throughput measurement | Samsung Electronics Polska | imported from 3GU |
R2‑1913908 | Discussion on Performing CHO instaed of RRE in CHO | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | imported from 3GU |
R2‑1913909 | CHO UE behaviour upon transitioning to RRC_INACTIVE/RRC_IDLE | Samsung Electronics Polska | imported from 3GU |
R2‑1913910 | Specification Impacts to specify Single Stack solution for NR | Samsung Electronics Polska | imported from 3GU |
R2‑1913911 | Single stack eMOB solution for 1Rx NR Ues | Samsung Electronics Polska | imported from 3GU |
R2‑1913912 | Correction on common search space | Google Inc. | imported from 3GU |
R2‑1913913 | Further considerations on handling UL LBT failures | ETRI | imported from 3GU |
R2‑1913914 | Clarification on criteria selection for 2-step RACH and 4-step RACH | Qualcomm Incorporated | imported from 3GU |
R2‑1913915 | Further consideration on SCG resumption | LG Electronics Inc. | imported from 3GU |
R2‑1913916 | Study on application of CHO mechanism to Conditional PSCell addition change | NTT DOCOMO INC. | imported from 3GU |
R2‑1913917 | Considerations on satellite location sharing | ETRI | imported from 3GU |
R2‑1913918 | Conditional resumption with validity check | LG Electronics Inc. | imported from 3GU |
R2‑1913919 | Further consideration on capability reporting | LG Electronics Inc. | imported from 3GU |
R2‑1913920 | Hop-by-Hop Flow control for IAB | Futurewei Technologies | imported from 3GU |
R2‑1913921 | Discussion on UE behavior for stored SCG/SCell configuration | MediaTek Inc. | imported from 3GU |
R2‑1913922 | Discussion on supporting SN terminated Split SRB for IAB CP in NSA deployments | Futurewei | imported from 3GU |
R2‑1913923 | Discussion on fixed vs. steerable beams in NTN LEO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913924 | Pre-trigger based mobility for NTN LEO with fixed beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913925 | To agree on the remaining NTN-TN service continuity aspects | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913926 | UE positioning requirements in NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913927 | Consideration on LEO mobility in NTN | CENC | imported from 3GU |
R2‑1913928 | NR Paging Frame Calculation when SearchSpaceId is Zero | MediaTek Inc. | imported from 3GU |
R2‑1913929 | Source RLM handling for RUDI HO with DAPS | SHARP Corporation | imported from 3GU |
R2‑1913930 | Considerations on the use of satellite Id in NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913931 | Report of email discussion [107#58][R16 NB-IoT/eMTC] RRC messages for D-PUR transmission and response | Huawei | imported from 3GU |
R2‑1913932 | Clarification on PUR release upon missing ‘m’ consecutive occasions | Gemalto N.V., Qualcomm Incorporated | imported from 3GU |
R2‑1913933 | Transmission in preconfigured resources | Gemalto N.V. | imported from 3GU |
R2‑1913934 | Periodicity and burst arrival encoding in TSCAI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913935 | Security Algorithms for all Radio Bearer in NR-DC | Qualcomm Incorporated | imported from 3GU |
R2‑1913936 | Clarification to CSI reporting in C-DRX | Qualcomm Inc. | imported from 3GU |
R2‑1913937 | CR of TS 36.305 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1913938 | CR of TS 36.355 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1913939 | CR of TS 36.331 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1913940 | Further considerations on RRM relaxation about reporting and coexistence with early measurements | LG Electronics | imported from 3GU |
R2‑1913941 | Left issues on MAC for NR-V2X | OPPO | imported from 3GU |
R2‑1913942 | Introduction of dormancy behavior in NR | OPPO | imported from 3GU |
R2‑1913943 | Simultaneous use of mode 1 and mode 2 | KT Corp. | imported from 3GU |
R2‑1913944 | CR to 38.331 on configuration of rach-ConfigCommon in initial UL BWP for RRC triggered BWP switch | Qualcomm Incorporated | imported from 3GU |
R2‑1913945 | Running CR on on-demand SI procedure in RRC_CONNECTED | Ericsson | imported from 3GU |
R2‑1913946 | Draft Reply LS on Sending CAG ID in NAS layer | Qualcomm Incorporated | imported from 3GU |
R2‑1913947 | Configuration aspects of wakeup signaling | Qualcomm Inc | imported from 3GU |
R2‑1913948 | Report of 107#73 NR V2X SDAP(vivo) | vivo | imported from 3GU |
R2‑1913949 | Some open issues for TS 37.320 to support NR MDT | CMCC | imported from 3GU |
R2‑1913950 | Running TS 37.320 CR | CMCC, Nokia | imported from 3GU |
R2‑1913951 | Impact of non-Numeric K1 Value to NR-U DRX | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑1913952 | Email discussion summary of [107#55][IIOT] CG/SPS for TSC | OPPO | imported from 3GU |
R2‑1913953 | Report of email discussion [107#64][NTN] Cell selection&reselection | LG Electronics | imported from 3GU |
R2‑1913954 | Draft LS on F1 over LTE | KDDI Corporation | imported from 3GU |
R2‑1913955 | [107#80][NR IIOT] Summary on Deprioritized PDUs (CATT) | CATT | imported from 3GU |
R2‑1913956 | Correction on PRACH re-transmission for SRS carrier switching | Huawei, HiSilicon, MediaTek | imported from 3GU |
R2‑1913957 | CR to 38.331 on configuration of rach-ConfigCommon in initial UL BWP for RRC triggered BWP switch | Qualcomm Incorporated | imported from 3GU |
R2‑1913958 | Correction to AS security key update | Ericsson | imported from 3GU |
R2‑1913959 | Transmission of CAG ID during Resume Procedure | Samsung | imported from 3GU |
R2‑1913960 | CR to 36.331 on support of F1AP over LTE for IAB | AT&T, KDDI | imported from 3GU |
R2‑1913961 | CR to 38.331 on support of F1AP over LTE for IAB | AT&T, KDDI | imported from 3GU |
R2‑1913962 | Propagation delay compensation for accurate reference timing | Huawei, HiSilicon, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1913963 | Remaining issues of reference time delivery | Huawei, HiSilicon, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1913964 | Importing consequences if not approved from RAN1 and RAN4 excel files | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913965 | On FR2 CA fall-backs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913966 | Discussion on priority misalignment issue | OPPO, Apple | imported from 3GU |
R2‑1913967 | Extended PO and early termination for page monitoring | Ericsson | imported from 3GU |
R2‑1913968 | Cell (re)selection for NR-U | Ericsson | imported from 3GU |
R2‑1913969 | [107#61][NR/NTN] Rapporteur Running TP | THALES | imported from 3GU |
R2‑1913970 | Reconfiguration with sync for NE-DC | Google Inc., Ericsson | imported from 3GU |
R2‑1913971 | Handover in (NG)EN-DC | Google Inc., Ericsson | imported from 3GU |
R2‑1913972 | Update LS on Release-with-Redirect in 2-step resume procedure (C1-196902; contact: OPPO) | CT1 | imported from 3GU |
R2‑1913973 | LS Reply on maximum value of MDBV (C3-194330; contact: Nokia) | CT3 | imported from 3GU |
R2‑1913974 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | Apple | imported from 3GU |
R2‑1913975 | Further consideration on HARQ configuration in NTN | CMCC,Huawei,HiSilicon,Sony,KT Corp. | imported from 3GU |
R2‑1913976 | Clarification of NR-DC synchronization | ZTE Corporation | imported from 3GU |
R2‑1913977 | [DRAFT] [Reply LS to RAN3] | Huawei | imported from 3GU |
R2‑1913978 | Clarification on measurement gap for LTE inter-RAT measurement in NR SA | MediaTek Inc., Nokia (Rapporteur) | imported from 3GU |
R2‑1913979 | SMTC setting in MR-DC PSCell change | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913980 | Correction on sending Failure Information via SRB3 | Ericsson, ZTE Corporation (Rapporteur) | imported from 3GU |
R2‑1913981 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913982 | Clarification on RA and Msg3 with PUSCH Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913983 | Missing QCI to CAPC mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1913984 | Correction to SIB5 acquisition for idle mode measurements | Ericsson | imported from 3GU |
R2‑1913985 | Correction on inter-frequency neighbour cell measurements | Ericsson | imported from 3GU |
R2‑1913986 | Correction to the handling of stored AS context upon CN type change | Huawei, HiSilicon | imported from 3GU |
R2‑1913987 | Result of offline discussion 101 on RSSI and channel occupancy measurement in LAA | Qualcomm Incorporated | imported from 3GU |
R2‑1913988 | Discussion on UDC reconfiguration for RRC connection reestablishment case | Huawei, HiSilicon | imported from 3GU |
R2‑1913989 | Correction on H1 and H2 events | Samsung Electronics Co., Ltd | imported from 3GU |
R2‑1913990 | Clarification of e-mail discussion for QoE measurements | Ericsson | imported from 3GU |
R2‑1913991 | [Draft] LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO | Qualcomm Incorporated | imported from 3GU |
R2‑1913992 | [DRAFT] LS on PDCP agreements | Huawei, HiSilicon, Mediatek Inc. | imported from 3GU |
R2‑1913993 | [Draft] LS for DAPS Handover UE capabilities | Intel Corporation | imported from 3GU |
R2‑1913994 | Result of offline discussion 109 on RAN2 agreements for interruption reduction feature name | Huawei | imported from 3GU |
R2‑1913995 | Running CR for the introduction of NR mobility enhancement | Intel Corporation | imported from 3GU |
R2‑1913996 | LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO | RAN2 | imported from 3GU |
R2‑1913997 | LS on UE feature list format for Release-16 UE capability | RAN2 | imported from 3GU |
R2‑1913998 | NR_IAB running CR for 38300 | Qualcomm Inc (Rapporteur) | imported from 3GU |
R2‑1913999 | LS to RAN1&4 on UE capabilities on DAPS HO | Intel Corporation | imported from 3GU |
R2‑1914000 | Running CR to 38.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1914001 | Running RRC CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1914002 | Running CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1914003 | Running Idle/Inactive mode CR for NR-based Access to Unlicensed Spectrum | Qualcomm Incorporated | imported from 3GU |
R2‑1914004 | Running CR for 36.300 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1914005 | Running CR for 38.300 for CA/DC Enhancements | Ericsson LM | imported from 3GU |
R2‑1914006 | Running CR for TS 38.340 (BAP) | Huawei | imported from 3GU |
R2‑1914007 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1914008 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1914009 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1914010 | (reserved) | Tero's tdocs | imported from 3GU |
R2‑1914011 | [DRAFT] LS on multi PDCCH-based multi-TRP operation | Ericsson | imported from 3GU |
R2‑1914012 | draft CR on CLI for TS38 331_v3_Alt2 | LG Electronics Inc | imported from 3GU |
R2‑1914013 | LS For Exchange of information related to SRS-RSRP measurement resource configuration for UE-CLI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914014 | Running CR for the introduction of SRVCC from 5G to 3G | Huawei, HiSilicon, China Unicom | imported from 3GU |
R2‑1914015 | [DRAFT] LS on multi PDCCH-based multi-TRP operation | Ericsson | imported from 3GU |
R2‑1914016 | [DRAFT] LS on No support of delta signalling | MediaTek | imported from 3GU |
R2‑1914017 | [DRAFT] LS Radio Capability Signalling Identity on X2/Xn interfaces | Nokia | imported from 3GU |
R2‑1914018 | Introduction of UECapabilityInformation segmentation in 36.331 | MediaTek Inc., CATT, Ericsson, Spreadtrum Communications, ZTE Corporation, Sanechips, OPPO, Qualcomm Incorporated | imported from 3GU |
R2‑1914019 | Introduction of UECapabilityInformation segmentation in 36.331 | ZTE | imported from 3GU |
R2‑1914020 | LS on multi PDCCH-based and single PDCCH-based multi-TRP operation | RAN2 | imported from 3GU |
R2‑1914021 | LS For Exchange of information related to SRS-RSRP measurement resource configuration for UE-CLI | RAN2 | imported from 3GU |
R2‑1914022 | LS on No support of delta signalling | RAN2 | imported from 3GU |
R2‑1914023 | LS Radio Capability Signalling Identity on X2/Xn interfaces | RAN2 | imported from 3GU |
R2‑1914024 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914025 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914026 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914027 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914028 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914029 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914030 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914031 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914032 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914033 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914034 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914035 | (reserved) | Sergio's tdocs | imported from 3GU |
R2‑1914036 | Introduction of Rel-16 eMTC enhancements | Intel Corporation | imported from 3GU |
R2‑1914037 | Introduction of additional enhancements for eMTC | Qualcomm Incorporated | imported from 3GU |
R2‑1914038 | Introduction of Rel-16 eMTC enhancements | Qualcomm Incorporated | imported from 3GU |
R2‑1914039 | Report of offline #301: Discussion on whether I-RNTI is adopted for UP CIoT 5GS Optimisation | LGE | imported from 3GU |
R2‑1914040 | [DRAFT] LS on RAN2 agreements for 5GC CIoT | Qualcomm | imported from 3GU |
R2‑1914041 | Summary of Offline discussion #303: RRC_INACTIVE for eMTC UEs connected to 5GC | Huawei, HiSilicon | imported from 3GU |
R2‑1914042 | Running CR for 36.304 -Rel-16 eMTC Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914043 | Clarification on UP-EDT | Huawei, HiSilicon | imported from 3GU |
R2‑1914044 | [DRAFT] LS on RAN2 agreements for 5GC CIoT | Qualcomm | imported from 3GU |
R2‑1914045 | LS on RAN2 agreements for 5GC CIoT | RAN2 | imported from 3GU |
R2‑1914046 | Running CR for 36.304 -Rel-16 eMTC Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914047 | [36.321 running CR] | Ericsson | imported from 3GU |
R2‑1914048 | [Report from Email [107bis#65][eMTC R16] UE identifier pros and cons (LG)] | LGE | imported from 3GU |
R2‑1914049 | Running CR for 36.304 -Rel-16 eMTC Enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914050 | (reserved) | Emre's tdocs | imported from 3GU |
R2‑1914051 | [DRAFT] LS to RAN1 on 2-step RACH | ZTE | imported from 3GU |
R2‑1914052 | Summary of discussion on rebudiling and fallback | Nokia | imported from 3GU |
R2‑1914053 | [DRAFT] LS on SFN LSB indication in msg2/msgB | Qualcomm | imported from 3GU |
R2‑1914054 | Summary of discussion on UL LBT | InterDigital | imported from 3GU |
R2‑1914055 | Clarification on satellite beam and PCI mapping | THALES, ERICSSON, Nokia | imported from 3GU |
R2‑1914056 | DRX HARQ RTT enhancements for NTN | Nomor Research GmbH | imported from 3GU |
R2‑1914057 | LS to RAN1 on WUS for short DRX cycle | vivo | imported from 3GU |
R2‑1914058 | Offline #506 Release assistance | Ericsson | imported from 3GU |
R2‑1914059 | Summary of offline discussion on UE assistance for Scell | CATT | imported from 3GU |
R2‑1914060 | LS to RAN1 on WUS for short DRX cycle | RAN2 | imported from 3GU |
R2‑1914061 | LS to RAN1 on question related to CSI/SRS reporting | vivo | imported from 3GU |
R2‑1914062 | TP editorial corrections | Nomor | imported from 3GU |
R2‑1914063 | On NR-U Operation in DFS Channels | Charter Communications, Inc | imported from 3GU |
R2‑1914064 | LS on SFN LSB indication in msg2/msgB | RAN2 | imported from 3GU |
R2‑1914065 | (reserved) | Diana's tdocs | imported from 3GU |
R2‑1914066 | [DRAFT] LS on PHR reporting for NR-U | Lenovo | imported from 3GU |
R2‑1914067 | [DRAFT] LS on differentiating between MSG2 and MSGB | ZTE | imported from 3GU |
R2‑1914068 | LS on PHR reporting for NR-U | RAN2 | imported from 3GU |
R2‑1914069 | TP on RACH capacity evaluation and procedures | ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1914070 | Report of email discussion [107#64][NTN] Cell selection&reselection | LG Electronics | imported from 3GU |
R2‑1914071 | CR of TS 36.355 for introducing NavIC in LTE | Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | imported from 3GU |
R2‑1914072 | Corrections for Positioning Architecture | Ericsson | imported from 3GU |
R2‑1914073 | [RAN2#107bis Offline-402] Converge on details of SSR Correction Points definition | u-blox AG | imported from 3GU |
R2‑1914074 | Sensor Provide Location Information Elements Correction | Polaris Wireless | imported from 3GU |
R2‑1914075 | Broadcast of TBS assistance data | NextNav, AT&T, FirstNet, Polaris Wireless | imported from 3GU |
R2‑1914076 | Broadcast of TBS assistance data | NextNav, AT&T, FirstNet, Polaris Wireless | imported from 3GU |
R2‑1914077 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914078 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914079 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914080 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914081 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914082 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914083 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914084 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914085 | (reserved) | Nathan's tdocs | imported from 3GU |
R2‑1914086 | [DRAFT] Reply LS on PDCP end user throughput measurements | CMCC | imported from 3GU |
R2‑1914087 | Reply LS on RACH Optimization and Mobility Robustness Optimization | RAN2 | imported from 3GU |
R2‑1914088 | (reserved) | HuNan's tdocs | imported from 3GU |
R2‑1914089 | Reply LS on PDCP end user throughput measurements | RAN2 | imported from 3GU |
R2‑1914090 | Report from session on SON/MDT | Session chair (CMCC) | imported from 3GU |
R2‑1914091 | Correction on T322 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914092 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | Document Rapporteur (BlackBerry) | imported from 3GU |
R2‑1914093 | Introduction of additional enhancements for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R2‑1914094 | Introduction of additional enhancements for NB-IoT | Huawei | imported from 3GU |
R2‑1914095 | Report of Offline discussion #703 (Qualcomm) For alignment of eMTC and NB-IoT 36.331 CR | Qualcomm | imported from 3GU |
R2‑1914096 | Report from offline #704 | Qualcomm Incorporated | imported from 3GU |
R2‑1914097 | Clarification of PDCCH monitoring period with non-zero DRX-startoffset for NB-IoT | NTT DOCOMO INC. | imported from 3GU |
R2‑1914098 | Summary of offline #706 | Qualcomm Incorporated | imported from 3GU |
R2‑1914099 | Running CR on 36.321 for NB-IoT | Ericsson | imported from 3GU |
R2‑1914100 | [Running CR on 36.304] | Nokia | imported from 3GU |
R2‑1914101 | Introduction of additional enhancements for NB-IoT in TS 36.331 | Huawei | imported from 3GU |
R2‑1914102 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | Document Rapporteur (BlackBerry) | imported from 3GU |
R2‑1914103 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914104 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914105 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914106 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914107 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914108 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914109 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914110 | (reserved) | Brian's tdocs | imported from 3GU |
R2‑1914111 | 38 323 running CR | CATT | imported from 3GU |
R2‑1914112 | Running CR to 37324 for 5G_V2X_NRSL | vivo (Rapporteur) | imported from 3GU |
R2‑1914113 | Running CR for 38.322 for NR V2X | Ericsson | imported from 3GU |
R2‑1914114 | Running CR to 38.300 on 5G V2X with NR sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1914115 | (running)36.304CR on cell selection(reselection) for NR V2X UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914116 | (running)38.304CR on cell selection(reselection) for NR V2X UE | ZTE Corporation, Sanechips | imported from 3GU |
R2‑1914117 | TP on NR V2X for TR 37.985 RAN2 parts | Huawei, HiSilicon | imported from 3GU |
R2‑1914118 | [DRAFT] LS on SL RLF handling | Ericsson | imported from 3GU |
R2‑1914119 | Summary of RAN2#107bis Offline-807 | vivo | imported from 3GU |
R2‑1914120 | Proposed LS on Layer-1 and Layer 2 Identifiers for NR Sidelink | LG Electronics Inc. | imported from 3GU |
R2‑1914121 | Clarification regarding QoS handling in MRDC with 5G CN | Samsung, ZTE Corporation | imported from 3GU |
R2‑1914122 | PDCP version in EN-DC | Ericsson | imported from 3GU |
R2‑1914123 | Remaining issues for correction on the condition of RBTermChange | Ericsson | imported from 3GU |
R2‑1914124 | Correction to field conditions in NE-DC | Ericsson | imported from 3GU |
R2‑1914125 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC | Huawei, HiSilicon | imported from 3GU |
R2‑1914126 | Correction to AS security key update | Ericsson | imported from 3GU |
R2‑1914127 | Presence and absence of TAC in NR cell | Ericsson | imported from 3GU |
R2‑1914128 | Configuration limitation for RRCRelease message in R15 | OPPO | imported from 3GU |
R2‑1914129 | KgNB derivation upon mobility | Qualcomm Incorporated | imported from 3GU |
R2‑1914130 | Security Algorithms for Radio Bearers | Qualcomm Incorporated | imported from 3GU |
R2‑1914131 | Report from session on LTE legacy, LTE TEI16 and NR/LTE Rel-16 Mobility | Vice Chairman (Nokia) | imported from 3GU |
R2‑1914132 | Report from Break-Out Session on SRVCC, CLI, PRN, eMIMO, RACS | Vice Chairman (ZTE) | imported from 3GU |
R2‑1914133 | Report eMTC breakout session | Session chair (Ericsson) | imported from 3GU |
R2‑1914134 | Session minutes for NR-U, Power Savings, NTN and 2-step RACH | Session chair (InterDigital) | imported from 3GU |
R2‑1914135 | Report from session on Rel-15 and 16 LTE and NR positioning | Session chair (MediaTek) | imported from 3GU |
R2‑1914136 | Report from session on SON/MDT | Session chair (CMCC) | imported from 3GU |
R2‑1914137 | Report NB-IoT breakout session | Session chair (Huawei) | imported from 3GU |
R2‑1914138 | Report from session on LTE V2X and NR V2X | Session chair (Samsung) | imported from 3GU |
R2‑1914139 | Definition of NR standalone | Ericsson | imported from 3GU |
R2‑1914140 | Clarification for aggregated bandwidth for overheating | Huawei, HiSilicon, Ericsson | imported from 3GU |
R2‑1914141 | WF on flexible BSR | OPPO | imported from 3GU |
R2‑1914142 | [Offline-811] Support of SL RLC AM | Huawei, HiSilicon | imported from 3GU |
R2‑1914143 | [DRAFT] LS on Handling Multiple Unicast Links with Peer UE | InterDigital | imported from 3GU |
R2‑1914144 | [DRAFT] LS on PC5-S Signaling and PC5-RRC connection for NR sidelink communication | LGE | imported from 3GU |
R2‑1914145 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914146 | Running CR for 38.322 for NR V2X | Ericsson | imported from 3GU |
R2‑1914147 | LS on Layer 2 Identifiers for NR Sidelink communication | RAN2 | imported from 3GU |
R2‑1914148 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914149 | LS on SL RLF handling | RAN2 | imported from 3GU |
R2‑1914150 | LS on Handling Multiple Unicast Links with Peer UE | RAN2 | imported from 3GU |
R2‑1914151 | LS on PC5-S Signaling and PC5-RRC connection for NR sidelink communication | RAN2 | imported from 3GU |
R2‑1914152 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914153 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914154 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914155 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914156 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914157 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914158 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914159 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914160 | (reserved) | Kyeongin's tdocs | imported from 3GU |
R2‑1914161 | Correction of UE assistance information | Samsung, Ericsson | imported from 3GU |
R2‑1914162 | [draft] Reply LS to RAN1 on SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R2‑1914163 | Work plan for Rel-16 UE Capability feature list | Intel Corporation | imported from 3GU |
R2‑1914164 | Draft reply LS on full configuration during SN Modification procedure | Huawei, HiSilicon | imported from 3GU |
R2‑1914165 | NTN_RAN2_107bis_offline1_outcomes | Thales | imported from 3GU |
R2‑1914166 | NTN_RAN2_107bis_offline2_outcomes | Thales | imported from 3GU |
R2‑1914167 | Correction to power limitations in (NG)EN-DC | Ericsson | imported from 3GU |
R2‑1914168 | LS on CLI measurement reporting range (R4-1911416; contact: LGE) | RAN4 | imported from 3GU |
R2‑1914169 | Correction to Pcompensation for FR2 | Huawei | imported from 3GU |
R2‑1914170 | [DRAFT] Reply LS on FR2 Pmax | Huawei | imported from 3GU |
R2‑1914171 | IAB routing and bearer mapping config | Qualcomm Incorporated (Rapporteur) | imported from 3GU |
R2‑1914172 | Correction of SRB3 handling at full configuration (Alt2) | Ericsson | imported from 3GU |
R2‑1914173 | Miscellaneous correction for late drop | Ericsson | imported from 3GU |
R2‑1914174 | Discussion on phase of the LTE CHO procedure | China Telecommunications | imported from 3GU |
R2‑1914175 | Clarification to CSI reporting in C-DRX | Qualcomm Inc. | imported from 3GU |
R2‑1914176 | Discussion on QoS flow in SLRB | Apple | imported from 3GU |
R2‑1914177 | Reply LS to LS on maximum value of MDBV (C4-194314; contact: Nokia) | CT4 | imported from 3GU |
R2‑1914178 | LS on NID structure and length (C4-194332; contact: Ericsson) | CT4 | imported from 3GU |
R2‑1914179 | [R2#107bis-offline-30] IAB LS on F1 over LTE | KDDI Corporation | imported from 3GU |
R2‑1914180 | Correction on ambiguity of UE FDD/TDD FR1/FR2 capabilities | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | imported from 3GU |
R2‑1914181 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.331) | Huawei, HiSilicon | imported from 3GU |
R2‑1914182 | BWCS for inter-ENDC BC with intra-ENDC BC | Huawei, HiSilicon | imported from 3GU |
R2‑1914183 | LS on PDCCH-based Power Saving Signal/Channel carrying indication of UE wakeup before DRX ON (R1-1911475; contact; CATT) | RAN1 | imported from 3GU |
R2‑1914184 | Introduction of B1C signal in BDS system in A-GNSS | CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | imported from 3GU |
R2‑1914185 | [DRAFT] LS to SA2 on reference time delivery | Ericsson | imported from 3GU |
R2‑1914186 | [RAN2#107bis Offline-031]: IAB routing and bearer mapping config | Qualcomm Inc | imported from 3GU |
R2‑1914187 | [DRAFT] LS to RAN1 on LCP restriction for dynamic grant | Qualcomm | imported from 3GU |
R2‑1914188 | Running CR for 38.331 on CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1914189 | Running CR for 36.331 for CA/DC Enhancements | Ericsson | imported from 3GU |
R2‑1914190 | Corrections to power limitations in NE-DC | Ericsson | imported from 3GU |
R2‑1914191 | LS on differentiating between MSG2 and MSGB | RAN2 | imported from 3GU |
R2‑1914192 | LS on UE adaptation to maximum number of MIMO layers (R1-1911528; contact: vivo) | RAN1 | imported from 3GU |
R2‑1914193 | Miscellaneous corrections on UE capability fields | Intel Corporation, NTT DoCoMo | imported from 3GU |
R2‑1914194 | TP on NTN Mobility Issues and Solutions | InterDigital | imported from 3GU |
R2‑1914195 | Ephemeris data | Ericsson | imported from 3GU |
R2‑1914196 | Report of email discussion [107#63][NR/NTN] | Ericsson | imported from 3GU |
R2‑1914197 | Further consideration on HARQ configuration in NTN | CMCC,Huawei,HiSilicon,Sony,KT Corp. | imported from 3GU |
R2‑1914198 | TP on HARQ configuration in NTN | CMCC, Nomor Research GmbH, Huawei, HiSilicon, Sony, KT Corp., NEC, Oppo, Nokia, ZTE, Ericsson, ETRI | imported from 3GU |
R2‑1914199 | TP on tracking area management in NTN | ZTE Corporation, Sanechips, Huawei, Ericsson, LG, CATT, OPPO, Hughes | imported from 3GU |
R2‑1914200 | LS to RAN1 on CSI/SRS reporting | RAN2 | imported from 3GU |
R2‑1914201 | Reply LS on potential improvements for delay critical QoS flows | RAN2 | imported from 3GU |
R2‑1914202 | [DRAFT] Reply LS to SA3 on FBS detection | Huawei, HiSilicon | imported from 3GU |
R2‑1914203 | Inclusion of 90MHz UE Bandwidth | Vodafone | imported from 3GU |
R2‑1914204 | [CR on adding CSI-RS inter-node message] | Huawei | imported from 3GU |
R2‑1914205 | Skipping supportedBandCombinationList of n90 | KDDI Corporation | imported from 3GU |
R2‑1914206 | LS on NR IAB case-1 timing (R1-1911548; contact: ZTE) | RAN1 | imported from 3GU |
R2‑1914207 | Reply LS on single PDCCH-based multi-TRP operation (R1-1911550; contact: Huawei) | RAN1 | imported from 3GU |
R2‑1914208 | Reply LS on MAC CE design for SCell BFR (R1-1911587; contact: Apple) | RAN1 | imported from 3GU |
R2‑1914209 | Correction on the frequency indication in SIB2 | Huawei, HiSilicon, Ericsson, MediaTek | imported from 3GU |
R2‑1914210 | [DRAFT] LS on direct SCell activation in RRC resume message | Qualcomm Incorporated | imported from 3GU |
R2‑1914211 | Report of offline discussion 020 on Correction of UE assistance information | Samsung | imported from 3GU |
R2‑1914212 | Report of offline discussion 040 on Signaling options for early measurement configuration | Samsung | imported from 3GU |
R2‑1914213 | LS to SA2 on reference time delivery | RAN2 | imported from 3GU |
R2‑1914214 | LCP restriction for Dynamic Grant | RAN2 | imported from 3GU |
R2‑1914215 | [DRAFT] LS on granularity of periodicity and burst arrival time in TSCAI | Qualcomm Incorporated | imported from 3GU |
R2‑1914216 | [DRAFT] LS on direct SCell activation in RRC resume message | Qualcomm Incorporated | imported from 3GU |
R2‑1914217 | LS on direct Scell activation in RRC resume message | RAN2 | imported from 3GU |
R2‑1914218 | Reply LS on full configuration during SN Modification procedure | RAN2 | imported from 3GU |
R2‑1914219 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R2‑1914220 | [DRAFT] LS on BCS reporting for EN-DC BC | Huawei | imported from 3GU |
R2‑1914221 | Reply LS to RAN1 on SFTD measurement | RAN2 | imported from 3GU |
R2‑1914222 | Reply LS on FR2 Pmax | RAN2 | imported from 3GU |
R2‑1914223 | Granularity of periodicity and burst arrival time in TSCAI | RAN2 | imported from 3GU |
R2‑1914224 | Reply LS to SA3 on FBS detection | RAN2 | imported from 3GU |
R2‑1914225 | Security Algorithms for Radio Bearers | Qualcomm Incorporated | imported from 3GU |
R2‑1914226 | LS on BCS reporting for EN-DC B | RAN2 | imported from 3GU |
R2‑1914227 | LS on direct Scell activation in RRC resume message | RAN2 | imported from 3GU |
R2‑1914228 | Reply LS on full configuration during SN Modification procedure | RAN2 | imported from 3GU |
page generated from database: 2024-04-13 13:51:47