3GPP TDocs (written contributions) at meeting
Meeting: R1-104-e - 2021-01-25 to 2021-02-05, Online
meeting id: R1-104-e (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑2100000 | Draft Agenda of RAN1#104-e meeting | RAN1 Chair | imported from 3GU |
R1‑2100001 | Report of RAN1#103-e meeting | ETSI MCC | imported from 3GU |
R1‑2100002 | Highlights from RAN#90-e | RAN1 Chair | imported from 3GU |
R1‑2100003 | LS on Rel-16 updated RAN4 UE features lists for LTE and NR | RAN4, CMCC | imported from 3GU |
R1‑2100004 | LS on inter-donor topology redundancy | RAN3, Samsung | imported from 3GU |
R1‑2100005 | LS on Rel-16 NR Positioning Correction | RAN3, Huawei | imported from 3GU |
R1‑2100006 | Reply LS on LS on signalling of satellite backhaul connection | RAN3, Huawei | imported from 3GU |
R1‑2100007 | LS on Phase noise and other RF Impairment modelling | RAN4, Ericsson | imported from 3GU |
R1‑2100008 | LS on measuring CSI-RS during SCell activation. | RAN4, Ericsson | imported from 3GU |
R1‑2100009 | LS on SL switching priority | RAN4, Xiaomi | imported from 3GU |
R1‑2100010 | LS response on cell-grouping UE capability for synchronous NR-DC | RAN4, Apple | imported from 3GU |
R1‑2100011 | LS on DC location reporting for intra-band UL CA | RAN4, Nokia | imported from 3GU |
R1‑2100012 | LS on removing restriction on configuring UL MIMO for SUL band | RAN4, CMCC | imported from 3GU |
R1‑2100013 | LS on TCI state indication at Direct SCell activation | RAN4, MediaTek | imported from 3GU |
R1‑2100014 | AN-PDB and PER targets for satellite access | SA2, Qualcomm | imported from 3GU |
R1‑2100015 | LS on New Standardized 5QIs for 5G-AIS (Advanced Interactive Services) | SA2, Tencent | imported from 3GU |
R1‑2100016 | LS on Use of Inclusive Language in 3GPP | SA, Intel | imported from 3GU |
R1‑2100017 | LS on Physical layer assisted lightweight AKA (PL-AKA) protocol for the Internet of things | SA3, Ericsson | imported from 3GU |
R1‑2100018 | LS on multi-TRP description in Stage-2 | RAN2, Nokia | imported from 3GU |
R1‑2100019 | LS on capability for extended RAR window monitoring | RAN2, Qualcomm | imported from 3GU |
R1‑2100020 | LS on Paging Enhancement | RAN2, MediaTek | imported from 3GU |
R1‑2100021 | LS to RAN1 on SL DRX design | RAN2, ZTE | imported from 3GU |
R1‑2100022 | LS on the use of simultaneous CSI-RS resources and ports | RAN2, Ericsson | imported from 3GU |
R1‑2100023 | LS on half-duplex operation | RAN2, Nokia | imported from 3GU |
R1‑2100024 | Reply LS on propagation delay compensation enhancements | RAN2, Nokia | imported from 3GU |
R1‑2100025 | LS on physical layer aspects of small data transmission | RAN2, ZTE | imported from 3GU |
R1‑2100026 | LS on overlapped data and SR are of equal L1 priority | RAN2, Huawei | imported from 3GU |
R1‑2100027 | Reply LS on power control for NR-DC | RAN2, vivo | imported from 3GU |
R1‑2100028 | Reply LS on Direct Discovery and Relay | RAN2, OPPO | imported from 3GU |
R1‑2100029 | Reply LS on defined values for V field in the Release 14 specification of MAC header | RAN2, Huawei | imported from 3GU |
R1‑2100030 | Reply LS on Full slot formats support in TDD UL-DL configuration | RAN2, Qualcomm | imported from 3GU |
R1‑2100031 | Reply LS on multi-CC simultaneous TCI activation with multi-TRP/panel transmission | RAN2, Ericsson | imported from 3GU |
R1‑2100032 | IEEE 1609 WG Liaison Message to 3GPP regarding defined values for V field in the Release 14 specification of MAC header | IEEE Vehicular Technology/Intelligent Transportation System 1609 WG | imported from 3GU |
R1‑2100033 | WI work plan for RedCap | Ericsson | imported from 3GU |
R1‑2100034 | UE complexity reduction for RedCap | Ericsson | imported from 3GU |
R1‑2100035 | Higher layer support for RedCap | Ericsson | imported from 3GU |
R1‑2100036 | Other aspects of RedCap | Ericsson | imported from 3GU |
R1‑2100037 | CSI feedback enhancements for URLLC | FUTUREWEI | imported from 3GU |
R1‑2100038 | Multi-TRP/panel for non-PDSCH | FUTUREWEI | imported from 3GU |
R1‑2100039 | Clarification on network synchronization for inter-cell multi-TRP operation | FUTUREWEI | imported from 3GU |
R1‑2100040 | Beam management for simultaneous multi-TRP transmission with multi-panel reception | FUTUREWEI | imported from 3GU |
R1‑2100041 | Enhancement to support HST-SFN deployment scenario | FUTUREWEI | imported from 3GU |
R1‑2100042 | Enhancements on SRS flexibility, coverage and capacity | FUTUREWEI | imported from 3GU |
R1‑2100043 | CSI enhancement for multi-TRP and FDD | FUTUREWEI | imported from 3GU |
R1‑2100044 | Enhancement on multi-beam operation | FUTUREWEI | imported from 3GU |
R1‑2100045 | Support efficient activation/de-activation mechanism for Scells | FUTUREWEI | imported from 3GU |
R1‑2100046 | Complexity reduction features for RedCap UEs | FUTUREWEI | imported from 3GU |
R1‑2100047 | Views on resource allocation enhancements for sidelink communication | FUTUREWEI | imported from 3GU |
R1‑2100048 | Discussion on PDCCH aspects for group scheduling | FUTUREWEI | imported from 3GU |
R1‑2100049 | Discussion on improving reliability for RRC_CONNECTED UEs | FUTUREWEI | imported from 3GU |
R1‑2100050 | Considerations for higher SCS in Beyond 52.6 GHz | FUTUREWEI | imported from 3GU |
R1‑2100051 | Considerations on initial access for additional SCS in Beyond 52.6GHz | FUTUREWEI | imported from 3GU |
R1‑2100052 | Beam management for shared spectrum access in Beyond 52.6GHz | FUTUREWEI | imported from 3GU |
R1‑2100053 | Considerations on channel access for shared spectrum Beyond 52.6 GHz | FUTUREWEI | imported from 3GU |
R1‑2100054 | Further considerations on UE initiated COT for FFP | FUTUREWEI | imported from 3GU |
R1‑2100055 | XR traffic model | FUTUREWEI | imported from 3GU |
R1‑2100056 | XR evaluation methodology | FUTUREWEI | imported from 3GU |
R1‑2100057 | Initial access enhancements for NR from 52.6 GHz to 71GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100058 | PDCCH monitoring enhancements for NR from 52.6 GHz to 71GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100059 | Enhancements to PUCCH formats 0/1/4 for NR from 52.6 GHz to 71GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100060 | Beam-management enhancements for NR from 52.6 GHz to 71GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100061 | PDSCH/PUSCH scheduling enhancements for NR from 52.6 GHz to 71GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100062 | Channel access mechanisms for NR from 52.6 GHz to 71GHz | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100063 | Discussions on Rel-17 Beam Management | InterDigital, Inc. | imported from 3GU |
R1‑2100064 | Discussion on M-TRP Enhancements for PDCCH, PUCCH, and PUSCH | InterDigital, Inc. | imported from 3GU |
R1‑2100065 | Synchronization Analysis for M-TRP Inter-cell Operation and RRC Configurations | InterDigital, Inc. | imported from 3GU |
R1‑2100066 | Discussion on M-TRP Beam Management Enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2100067 | Enhancements for M-TPR Transmission to Support HST-SFN in Rel-17 | InterDigital, Inc. | imported from 3GU |
R1‑2100068 | Flexible SRS Transmission and Antenna Switching | InterDigital, Inc. | imported from 3GU |
R1‑2100069 | CSI Enhancements for the Support of NCJT MTRP | InterDigital, Inc. | imported from 3GU |
R1‑2100070 | Further Results on Multi-Panel UE Performance in a Multi-TRP Deployment | InterDigital, Inc. | imported from 3GU |
R1‑2100071 | Draft CR on the multi-PUSCH TDRA | ZTE, Sanechips | imported from 3GU |
R1‑2100072 | Remaining issue on the channel access for FBE | ZTE, Sanechips | imported from 3GU |
R1‑2100073 | Discussion on the initial access aspects for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100074 | Discussion on the PDCCH monitoring enhancements for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100075 | Discussion on the PUCCH enhancements for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100076 | Discussion on the beam management for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100077 | Discussion on the data channel enhancements for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100078 | Discussion on the channel access for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100079 | Evaluation results for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2100080 | Discussion on the physical layer aspects of small data transmission | ZTE, Sanechips | imported from 3GU |
R1‑2100081 | Draft CR on clarification of TPC command for PUCCH | ZTE | imported from 3GU |
R1‑2100082 | Discussion on UL skipping for PUSCH | ZTE | imported from 3GU |
R1‑2100083 | Draft CR on Type-2 HARQ-ACK codebook in physical uplink shared channel | ZTE | imported from 3GU |
R1‑2100084 | Discussion on Ambiguity Issues for UE Features with Cross-Carrier Operation | ZTE | imported from 3GU |
R1‑2100085 | [DRAFT] Reply LS on half-duplex operation | ZTE | imported from 3GU |
R1‑2100086 | Discussion on Rel-17 UL Tx Switching | ZTE | imported from 3GU |
R1‑2100087 | Remaining issues of Rel-16 UL Tx Switching | ZTE | imported from 3GU |
R1‑2100088 | [DRAFT] Reply LS on overlapped data and SR of equal L1 priority | ZTE | imported from 3GU |
R1‑2100089 | Discussion on overlapped data and SR of equal L1 priority | ZTE | imported from 3GU |
R1‑2100090 | Draft CR on PUSCH preparation procedure time | ZTE | imported from 3GU |
R1‑2100091 | Remaining issues on intra-UE multiplexing in Rel-16 URLLC | ZTE | imported from 3GU |
R1‑2100092 | Discussion on the timing for secondary cell activation and deactivation | ZTE | imported from 3GU |
R1‑2100093 | Maintenance of Rel-16 MR-DC and CA | ZTE | imported from 3GU |
R1‑2100094 | Discussion on NR Rel-16 UE Features | ZTE | imported from 3GU |
R1‑2100095 | Discussion on enhanced PUSCH repetition type A | ZTE | imported from 3GU |
R1‑2100096 | Discussion on TB processing over multi-slot PUSCH | ZTE | imported from 3GU |
R1‑2100097 | Discussion on joint channel estimation for PUSCH | ZTE | imported from 3GU |
R1‑2100098 | Discussion on coverage enhancements for PUCCH | ZTE | imported from 3GU |
R1‑2100099 | Discussion on support of Type A PUSCH repetitions for Msg3 | ZTE | imported from 3GU |
R1‑2100100 | Discussion on PUSCH and Msg3 enhancements for Redcap UEs | ZTE | imported from 3GU |
R1‑2100101 | Discussion on HARQ-ACK enhancements for eURLLC | ZTE | imported from 3GU |
R1‑2100102 | Discussion on CSI feedback enhancements for eURLLC | ZTE | imported from 3GU |
R1‑2100103 | Discussion on unlicensed band URLLC/IIoT | ZTE | imported from 3GU |
R1‑2100104 | Discussion on enhanced intra-UE multiplexing | ZTE | imported from 3GU |
R1‑2100105 | Discussion on propagation delay compensation enhancements | ZTE | imported from 3GU |
R1‑2100106 | Discussion on mechanisms to Support Group Scheduling for RRC_CONNECTED UEs | ZTE | imported from 3GU |
R1‑2100107 | Discussion on mechanisms to Improve Reliability for RRC_CONNECTED UEs | ZTE | imported from 3GU |
R1‑2100108 | Discussion on basic Functions for Broadcast or Multicast for RRC_IDLE or RRC_INACTIVE UEs | ZTE | imported from 3GU |
R1‑2100109 | Consideration on performance enhancement for RRC_IDLE/INACTIVE UEs | ZTE | imported from 3GU |
R1‑2100110 | Discussion on Cross-Carrier Scheduling from SCell to PCell | ZTE | imported from 3GU |
R1‑2100111 | Discussion on Multi-cell PDSCH Scheduling via a Single DCI | ZTE | imported from 3GU |
R1‑2100112 | Discussion on Support Efficient Activation De-activation Mechanism for SCells in NR CA | ZTE | imported from 3GU |
R1‑2100113 | Text proposals for default close loop index for different TRPs | OPPO | imported from 3GU |
R1‑2100114 | Text proposals for overlapping between uplink signals | OPPO | imported from 3GU |
R1‑2100115 | Text Proposals for Multi-beam Operation Enhancement | OPPO | imported from 3GU |
R1‑2100116 | Enhancement on uplink power control for M-TRP | OPPO | imported from 3GU |
R1‑2100117 | Text Proposals for Tx Switching between Two Uplink Carriers | OPPO | imported from 3GU |
R1‑2100118 | Enhancements on Multi-beam Operation | OPPO | imported from 3GU |
R1‑2100119 | Enhancements on Multi-TRP based enhancement for PDCCH, PUCCH and PUSCH | OPPO | imported from 3GU |
R1‑2100120 | Enhancement on inter-cell multi-TRP operation | OPPO | imported from 3GU |
R1‑2100121 | Enhancements on beam management for multi-TRP | OPPO | imported from 3GU |
R1‑2100122 | Enhancements on HST-SFN deployment | OPPO | imported from 3GU |
R1‑2100123 | Enhancements on SRS flexibility, coverage and capacity | OPPO | imported from 3GU |
R1‑2100124 | CSI enhancement for M-TRP and FDD reciprocity | OPPO | imported from 3GU |
R1‑2100125 | Discussion on LS on multi-TRP description in Stage-2 | OPPO | imported from 3GU |
R1‑2100126 | Dsicussion on Rel-17 Tx switching enhancement | OPPO | imported from 3GU |
R1‑2100127 | Text Proposals on NR Positioning | OPPO | imported from 3GU |
R1‑2100128 | Enhancement of timing-based positioning by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | OPPO | imported from 3GU |
R1‑2100129 | Enhancements for UL AoA Positioning | OPPO | imported from 3GU |
R1‑2100130 | Enhancements for DL-AoD positioning | OPPO | imported from 3GU |
R1‑2100131 | Discussion on NR Positioning Enhancements | OPPO | imported from 3GU |
R1‑2100132 | Discussion on the XR traffic models for evaluation | OPPO | imported from 3GU |
R1‑2100133 | Discussion on the XR evaluation methodology | OPPO | imported from 3GU |
R1‑2100134 | Discussion on the support of XR/CG service in sidelink-unlicensed | OPPO | imported from 3GU |
R1‑2100135 | Draft TP on physical strucutre for NR sidelink | OPPO | imported from 3GU |
R1‑2100136 | Remaining open issues and corrections for physical layer procedure | OPPO | imported from 3GU |
R1‑2100137 | Remaining open issues and corrections for mode 1 and mode 2 RA | OPPO | imported from 3GU |
R1‑2100138 | Draft reply LS on per-table MCS range for mode-2 | OPPO | imported from 3GU |
R1‑2100139 | Draft reply LS on SL switching priority | OPPO | imported from 3GU |
R1‑2100140 | Correction for V2X UE feature list | OPPO | imported from 3GU |
R1‑2100141 | Power saving mechanism in NR sidelink | OPPO | imported from 3GU |
R1‑2100142 | Inter-UE coordination in mode 2 of NR sidelink | OPPO | imported from 3GU |
R1‑2100143 | Remaining issues in sidelink evaluation methdology for power saving | OPPO | imported from 3GU |
R1‑2100144 | Group scheduling for NR Multicast and Broadcast Services | OPPO | imported from 3GU |
R1‑2100145 | UL feedback for RRC-CONNECTED UEs in MBMS | OPPO | imported from 3GU |
R1‑2100146 | Discussion on support for IDLE and INACTIVE state UEs | OPPO | imported from 3GU |
R1‑2100147 | Discussion on the remaining issues of channel access procedure | OPPO | imported from 3GU |
R1‑2100148 | Text proposals on type-3 HARQ-ACK codebook | OPPO | imported from 3GU |
R1‑2100149 | Discusson on initial access aspects | OPPO | imported from 3GU |
R1‑2100150 | Discussion on PDCCH monitoring | OPPO | imported from 3GU |
R1‑2100151 | Discussion on enhancements for PUCCH format 0/1/4 | OPPO | imported from 3GU |
R1‑2100152 | Discussion on beam management | OPPO | imported from 3GU |
R1‑2100153 | Discussion on PDSCH/PUSCH enhancements | OPPO | imported from 3GU |
R1‑2100154 | Discussion on channel access mechanism | OPPO | imported from 3GU |
R1‑2100155 | Discussion on other aspects | OPPO | imported from 3GU |
R1‑2100156 | Discusson on timing relationship enhancement | OPPO | imported from 3GU |
R1‑2100157 | Discussion on UL time and frequency synchronization | OPPO | imported from 3GU |
R1‑2100158 | Discussion on HARQ enhancement | OPPO | imported from 3GU |
R1‑2100159 | Discussion on other aspects | OPPO | imported from 3GU |
R1‑2100160 | Discussion on scenarios applicable to NB-IoT/eMTC | OPPO | imported from 3GU |
R1‑2100161 | Discussion on enhancements to time and frequency synchronization | OPPO | imported from 3GU |
R1‑2100162 | Discussion on timing relationship enhancements | OPPO | imported from 3GU |
R1‑2100163 | Discussion on HARQ enhancements | OPPO | imported from 3GU |
R1‑2100164 | Discussion on other aspects | OPPO | imported from 3GU |
R1‑2100165 | Discussion on UE complexity reduction | OPPO | imported from 3GU |
R1‑2100166 | Mechanism in higher&PHY layer for Reduced Capability NR Devices | OPPO | imported from 3GU |
R1‑2100167 | Other considerations for reduced UE capability | OPPO | imported from 3GU |
R1‑2100168 | Further discussion on Paging enhancements for power saving | OPPO | imported from 3GU |
R1‑2100169 | Further discussion on RS occasion for idle/inactive UEs | OPPO | imported from 3GU |
R1‑2100170 | DCI-based power saving adaptation solutions | OPPO | imported from 3GU |
R1‑2100171 | Discussion on RLM relaxation | OPPO | imported from 3GU |
R1‑2100172 | Enhancements on PUSCH repetition type A | OPPO | imported from 3GU |
R1‑2100173 | Supporting TB over multi-slot PUSCH | OPPO | imported from 3GU |
R1‑2100174 | Joint channel estimation for PUSCH | OPPO | imported from 3GU |
R1‑2100175 | PUCCH enhancements for coverage | OPPO | imported from 3GU |
R1‑2100176 | Type A PUSCH repetitions for Msg3 coverage | OPPO | imported from 3GU |
R1‑2100177 | Other considerations for coverage enhancement | OPPO | imported from 3GU |
R1‑2100178 | Text proposal for intra UE prioritization timeline | OPPO | imported from 3GU |
R1‑2100179 | Remaining issues on scheduling and HARQ | OPPO | imported from 3GU |
R1‑2100180 | Remaining issues on DL SPS enhancement | OPPO | imported from 3GU |
R1‑2100181 | HARQ-ACK enhancements for Rel-17 URLLC/IIoT | OPPO | imported from 3GU |
R1‑2100182 | CSI feedback enhancements for URLLC | OPPO | imported from 3GU |
R1‑2100183 | Enhancements for unlicensed band URLLC/IIoT | OPPO | imported from 3GU |
R1‑2100184 | Enhancements on intra-UE multiplexing/prioritization | OPPO | imported from 3GU |
R1‑2100185 | Enhancements for Propagation Delay Compensation | OPPO | imported from 3GU |
R1‑2100186 | Discussion on cross-carrier scheduling from Scell to Pcell | OPPO | imported from 3GU |
R1‑2100187 | Discussion on multi-cell PDSCH scheduling via a single DCI | OPPO | imported from 3GU |
R1‑2100188 | Discussion on efficient activation/de-activation for Scell | OPPO | imported from 3GU |
R1‑2100189 | Resource configuration and group scheduling for RRC_CONNECTED UEs | Huawei, HiSilicon | imported from 3GU |
R1‑2100190 | Mechanisms to improve reliability for RRC_CONNECTED UEs | Huawei, HiSilicon | imported from 3GU |
R1‑2100191 | Discussion on multicast support for IDLE/INACTIVE UEs | Huawei, HiSilicon | imported from 3GU |
R1‑2100192 | Remaining issues on CA | Huawei, HiSilicon | imported from 3GU |
R1‑2100193 | Discussion on SCell PDCCH scheduling P(S)Cell PDSCH or PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑2100194 | Discussion on multi-carrier scheduling using single PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑2100195 | Enhancement to mitigate gNB and UE Rx/Tx timing error | Huawei, HiSilicon | imported from 3GU |
R1‑2100196 | Coverage enhancements for PUSCH repetition typeA | Huawei, HiSilicon | imported from 3GU |
R1‑2100197 | Msg3 repetition for coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑2100198 | PUCCH coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑2100199 | Maintenance on channel access procedures for NR Unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑2100200 | Initial access signals and channels for 52-71GHz band | Huawei, HiSilicon | imported from 3GU |
R1‑2100201 | PDSCH/PUSCH enhancments for 52-71GHz band | Huawei, HiSilicon | imported from 3GU |
R1‑2100202 | Channel access mechanism for 60 GHz unlicensed operation | Huawei, HiSilicon | imported from 3GU |
R1‑2100203 | Discussion on the beam management procedures for 52-71GHz band | Huawei, HiSilicon | imported from 3GU |
R1‑2100204 | Remaining details of sidelink resource allocation mode 2 | Huawei, HiSilicon | imported from 3GU |
R1‑2100205 | Sidelink resource allocation to reduce power consumption | Huawei, HiSilicon | imported from 3GU |
R1‑2100206 | Inter-UE coordination in sidelink resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑2100207 | Discussion on applications and traffic model for XR and Cloud Gaming | Huawei, HiSilicon | imported from 3GU |
R1‑2100208 | Enhancements on multi-beam operation | Huawei, HiSilicon | imported from 3GU |
R1‑2100209 | Enhancements on multi-TRP for reliability and robustness in Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2100210 | Enhancements on inter-cell multi-TRP operations in Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2100211 | Multi-panel reception for multi-TRP in Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2100212 | Enhancements for high speed train for multi-TRP in Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2100213 | Enhancements on SRS for Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2100214 | CSI Enhancements for Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2100215 | On support of DL 1024QAM for NR FR1 | Huawei, HiSilicon | imported from 3GU |
R1‑2100216 | Paging enhancement(s) for UE power saving in IDLE/inactive mode | Huawei, HiSilicon | imported from 3GU |
R1‑2100217 | Assistance RS occasions for IDLE/inactive mode | Huawei, HiSilicon | imported from 3GU |
R1‑2100218 | Extension(s) to Rel-16 DCI-based power saving adaptation for an active BWP | Huawei, HiSilicon | imported from 3GU |
R1‑2100219 | Resource multiplexing between backhaul and access for IAB duplexing enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑2100220 | Enhancements for simultaneous operation of MT and DU | Huawei, HiSilicon | imported from 3GU |
R1‑2100221 | Other enhancements for IAB | Huawei, HiSilicon | imported from 3GU |
R1‑2100222 | Discussion on timing relationship enhancements for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100223 | Discussion on UL time and frequency synchronization enhancement for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100224 | Discussion on HARQ enhancement for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100225 | Application scenarios of IoT in NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100226 | UE feedback enhancements for HARQ-ACK | Huawei, HiSilicon | imported from 3GU |
R1‑2100227 | CSI feedback enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑2100228 | Intra-UE multiplexing enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑2100229 | Uplink enhancements for URLLC in unlicensed controlled environments | Huawei, HiSilicon | imported from 3GU |
R1‑2100230 | Potential solutions for UE complexity reduction | Huawei, HiSilicon | imported from 3GU |
R1‑2100231 | RAN1 aspects of RedCap UE type and identification | Huawei, HiSilicon | imported from 3GU |
R1‑2100232 | Discussion on TB processing over multi-slot PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑2100233 | Discussion on Joint channel estimation for PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑2100234 | Discussion on time and frequency synchronization enhancement for IoT in NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100235 | Discussion on timing relationship enhancement for IoT in NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100236 | Discussion on HARQ enhancement for IoT in NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2100237 | Enhancement for UL AoA positioning | Huawei, HiSilicon | imported from 3GU |
R1‑2100238 | Enhancement for DL AoD positioning | Huawei, HiSilicon | imported from 3GU |
R1‑2100239 | Enhancement on PUCCH formats | Huawei, HiSilicon | imported from 3GU |
R1‑2100240 | Maintenance on DL signals and channels for NR Unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑2100241 | Enhancement on PDCCH monitoring | Huawei, HiSilicon | imported from 3GU |
R1‑2100242 | Discussion on evaluation methodology for XR and Cloud Gaming | Huawei, HiSilicon | imported from 3GU |
R1‑2100243 | Correction on DMRS configuration for MsgA | Huawei, HiSilicon | imported from 3GU |
R1‑2100244 | Discussion on timing relationship for NR-NTN | ZTE | imported from 3GU |
R1‑2100245 | Discussion on UL synchronization for NR-NTN | ZTE | imported from 3GU |
R1‑2100246 | Discussion on HARQ for NR-NTN | ZTE | imported from 3GU |
R1‑2100247 | Discussion on additional enhancement for NR-NTN | ZTE | imported from 3GU |
R1‑2100248 | Discussion on the scenarios and assumption for IoT-NTN | ZTE | imported from 3GU |
R1‑2100249 | Discussion on the synchronization for IoT-NTN | ZTE | imported from 3GU |
R1‑2100250 | Discussion on timing relationship for IoT-NTN | ZTE | imported from 3GU |
R1‑2100251 | Discussion on HARQ for IoT-NTN | ZTE | imported from 3GU |
R1‑2100252 | Discussion on additional enhancement for IoT-NTN | ZTE | imported from 3GU |
R1‑2100253 | Support of 16QAM for unicast in UL and DL in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑2100254 | Support of 14-HARQ processes in DL for HD-FDD MTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑2100255 | Support of a max DL TBS of 1736 bits in LTE-MTC | Huawei, HiSilicon | imported from 3GU |
R1‑2100256 | Alignment of notation | Ericsson | imported from 3GU |
R1‑2100257 | Initial access aspects | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100258 | PDCCH monitoring enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100259 | Enhancements for PUCCH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100260 | Beam Management Aspects | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100261 | PDSCH/PUSCH enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100262 | Channel access mechanism | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100263 | Simulation Results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100264 | IoT NTN Observations and Proposals | Lockheed Martin | imported from 3GU |
R1‑2100265 | Intra-UE Multiplexing and Prioritization for Rel-16 URLLC | Ericsson | imported from 3GU |
R1‑2100266 | Maintenance of UCI for NR URLLC | Ericsson | imported from 3GU |
R1‑2100267 | Maintenance of Scheduling/HARQ for NR URLLC | Ericsson | imported from 3GU |
R1‑2100268 | HARQ-ACK Enhancements for IIoT/URLLC | Ericsson | imported from 3GU |
R1‑2100269 | CSI Feedback Enhancements for IIoT/URLLC | Ericsson | imported from 3GU |
R1‑2100270 | Enhancements for IIoT/URLLC on Unlicensed Band | Ericsson | imported from 3GU |
R1‑2100271 | Intra-UE Multiplexing/Prioritization Enhancements for IIoT/URLLC | Ericsson | imported from 3GU |
R1‑2100272 | Propagation Delay Compensation Enhancements for Time Synchronization | Ericsson | imported from 3GU |
R1‑2100273 | Enhancements on Multi-beam Operation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100274 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100275 | Enhancements on Multi-TRP inter-cell operation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100276 | Enhancements on beam management for multi-TRP | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100277 | Enhancements on SRS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100278 | HARQ feedback of SPS PDSCH reception in multi-DCI based multiple TRPs | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100279 | Maintenance of multi-beam operation | ZTE | imported from 3GU |
R1‑2100280 | Draft CR on UL full power transmission Mode 1 | ZTE | imported from 3GU |
R1‑2100281 | Maintenance of Multi-TRP enhancements | ZTE | imported from 3GU |
R1‑2100282 | Maintenance of NR positioning support | ZTE | imported from 3GU |
R1‑2100283 | Discussion on closed-loop power control with an absolute TPC command | ZTE | imported from 3GU |
R1‑2100284 | Draft CR on closed-loop power control with an absolute TPC command | ZTE | imported from 3GU |
R1‑2100285 | Enhancements on Multi-beam Operation | ZTE | imported from 3GU |
R1‑2100286 | Multi-TRP enhancements for PDCCH, PUCCH and PUSCH | ZTE | imported from 3GU |
R1‑2100287 | Discussion on Multi-TRP inter-cell operation | ZTE | imported from 3GU |
R1‑2100288 | Enhancements on beam management for Multi-TRP | ZTE | imported from 3GU |
R1‑2100289 | Discussion on Multi-TRP HST enhancements | ZTE | imported from 3GU |
R1‑2100290 | Enhancements on SRS flexibility, coverage and capacity | ZTE | imported from 3GU |
R1‑2100291 | CSI enhancements for Multi-TRP and FR1 FDD reciprocity | ZTE | imported from 3GU |
R1‑2100292 | Further details on Multi-beam and Multi-TRP operation | ZTE | imported from 3GU |
R1‑2100293 | Positioning accuracy improvement by mitigating timing delay | ZTE | imported from 3GU |
R1‑2100294 | Accuracy improvement for UL-AoA positioning solutions | ZTE | imported from 3GU |
R1‑2100295 | Accuracy improvements for DL-AoD positioning solutions | ZTE | imported from 3GU |
R1‑2100296 | Other accuracy enhancements for NR positioning | ZTE | imported from 3GU |
R1‑2100297 | Discussion on issues of NR codeword mapping | ZTE | imported from 3GU |
R1‑2100298 | Maintenance on multi-TRP transmission | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100299 | Some views on initial access aspects for 52.6-71GHz | CAICT | imported from 3GU |
R1‑2100300 | Discussions on PDSCH and PUSCH enhancements for 52.6-71GHz | CAICT | imported from 3GU |
R1‑2100301 | Discussions on channel access mechanism for 52.6G-71 GHz | CAICT | imported from 3GU |
R1‑2100302 | UE feedback enhancements for HARQ-ACK | CAICT | imported from 3GU |
R1‑2100303 | Considerations of intra UE multiplexing | CAICT | imported from 3GU |
R1‑2100304 | Timing relationship enhancements to support NTN | CAICT | imported from 3GU |
R1‑2100305 | Considerations on Enhancements on UL Time Synchronization in NTN | CAICT | imported from 3GU |
R1‑2100306 | Enhancements on HARQ to support NTN | CAICT | imported from 3GU |
R1‑2100307 | Discusson on beam management of NTN | CAICT | imported from 3GU |
R1‑2100308 | Disussion on accuracy improvements of NR positioning enhancements | CAICT | imported from 3GU |
R1‑2100309 | Considerations on partial sensing in NR V2X | CAICT | imported from 3GU |
R1‑2100310 | Consideration on reduced capability bandwidth reduction | TCL Communication Ltd. | imported from 3GU |
R1‑2100311 | Discussion on LS from RAN2 on SL DRX design | CATT, GOHIGH | imported from 3GU |
R1‑2100312 | Discussion on RAN3 LS on Rel-16 NR Positioning Correction | CATT | imported from 3GU |
R1‑2100313 | Draft Reply LS on Rel-16 NR Positioning Correction | CATT | imported from 3GU |
R1‑2100314 | Draft Reply LS on RAN1 agreement on pre-emption | CATT, GOHIGH | imported from 3GU |
R1‑2100315 | Draft Reply LS on per table MCS range for mode-2 | CATT, GOHIGH | imported from 3GU |
R1‑2100316 | Draft Reply LS on SL switching priority | CATT, GOHIGH | imported from 3GU |
R1‑2100317 | Discussion on physical layer aspects of small data transmission | CATT | imported from 3GU |
R1‑2100318 | Discussion on overlapped data and SR of equal L1 priority | CATT | imported from 3GU |
R1‑2100319 | Draft reply LS on half-duplex operation | CATT | imported from 3GU |
R1‑2100320 | Draft CR to 36.214 on corrections for Reference Point for eNB Rx – Tx time difference | CATT | imported from 3GU |
R1‑2100321 | Discussion on PUSCH skipping | CATT | imported from 3GU |
R1‑2100322 | Correction on HARQ-ACK transmission in PUCCH | CATT | imported from 3GU |
R1‑2100323 | Correction on HARQ-ACK transmission in PUCCH | CATT | imported from 3GU |
R1‑2100324 | Correction on HARQ-ACK transmission in PUSCH | CATT | imported from 3GU |
R1‑2100325 | Correction on HARQ-ACK transmission in PUSCH | CATT | imported from 3GU |
R1‑2100326 | Correction on UCI multiplexing with PUCCH overriding | CATT | imported from 3GU |
R1‑2100327 | Correction on HARQ-ACK/SR/CSI multiplexing in a PUCCH | CATT | imported from 3GU |
R1‑2100328 | Correction to UE CSI computation time | CATT | imported from 3GU |
R1‑2100329 | Correction on UE sounding procedure | CATT | imported from 3GU |
R1‑2100330 | Correction on half-duplex operation in CA with unpaired spectrum | CATT | imported from 3GU |
R1‑2100331 | Correction on Type-3 HARQ-ACK codebook | CATT | imported from 3GU |
R1‑2100332 | Correction on power control for HARQ-ACK transmission | CATT | imported from 3GU |
R1‑2100333 | Discussion and TPs on sidelink synchronization mechanism and physical layer structure in NR V2X | CATT, GOHIGH | imported from 3GU |
R1‑2100334 | Discussion and TPs on resource allocation in NR V2X | CATT, GOHIGH | imported from 3GU |
R1‑2100335 | Discussion and TPs on physical layer procedures in NR V2X | CATT, GOHIGH | imported from 3GU |
R1‑2100336 | Discussion on overlapping between CG PUSCH and DG PUSCH | CATT | imported from 3GU |
R1‑2100337 | Remaining issues on UCI enhancements | CATT | imported from 3GU |
R1‑2100338 | Remaining issues on intra-UE prioritization | CATT | imported from 3GU |
R1‑2100339 | Corrections to multi-beam operation | CATT | imported from 3GU |
R1‑2100340 | On remaining issues of multi-TRP/panel transmission | CATT | imported from 3GU |
R1‑2100341 | Draft TS38.213 CR on UE behavior of DRX group configuration | CATT | imported from 3GU |
R1‑2100342 | Discussion and TP on remaining issues in NR positioning | CATT | imported from 3GU |
R1‑2100343 | Enhancements on multi-beam operation | CATT | imported from 3GU |
R1‑2100344 | Enhancements on multi-TRP/panel for PDCCH, PUCCH and PUSCH | CATT | imported from 3GU |
R1‑2100345 | Inter-cell operation for multi-TRP/panel | CATT | imported from 3GU |
R1‑2100346 | Enhancements on beam management for multi-TRP | CATT | imported from 3GU |
R1‑2100347 | Discussion on enhancements for HST-SFN deployment | CATT | imported from 3GU |
R1‑2100348 | Discussion on SRS enhancement for Rel-17 | CATT | imported from 3GU |
R1‑2100349 | Further discussion on CSI enhancements for Rel-17 | CATT | imported from 3GU |
R1‑2100350 | Evaluation of enhancements for multi-TRP | CATT | imported from 3GU |
R1‑2100351 | Discussion on resource allocation for power saving | CATT, GOHIGH | imported from 3GU |
R1‑2100352 | Discussion on feasibility and benefits for mode 2 enhancements | CATT, GOHIGH | imported from 3GU |
R1‑2100353 | Remaining issues on sidelink evaluation methodology | CATT, GOHIGH | imported from 3GU |
R1‑2100354 | Discussion on group scheduling mechanism for RRC_CONNECTED UEs in MBS | CATT | imported from 3GU |
R1‑2100355 | Discussion on reliability improvement mechanism for RRC_CONNECTED UEs in MBS | CATT | imported from 3GU |
R1‑2100356 | Discussion on basic functions for broadcast/multicast for RRC_IDLE/RRC_INACTIVE UEs | CATT, CBN | imported from 3GU |
R1‑2100357 | Discussion on search space type definition for group scheduling | CATT | imported from 3GU |
R1‑2100358 | Discussion on cross-carrier scheduling from Scell to Pcell | CATT | imported from 3GU |
R1‑2100359 | Discussion on multi-cell PDSCH scheduling via a single DCI | CATT | imported from 3GU |
R1‑2100360 | Discussion on efficient activation and de-activation mechanism for SCell in NR CA | CATT | imported from 3GU |
R1‑2100361 | XR traffic model | CATT | imported from 3GU |
R1‑2100362 | Evaluation methodology and performance index for XR | CATT | imported from 3GU |
R1‑2100363 | Evaluation results of XR performance | CATT | imported from 3GU |
R1‑2100364 | Potential area of NR enhancement for the support of XR services | CATT | imported from 3GU |
R1‑2100365 | Applicable scenarios to NB-IoT/eMTC | CATT | imported from 3GU |
R1‑2100366 | Time and frequency synchronization for NB-IoT/eMTC | CATT | imported from 3GU |
R1‑2100367 | Timing relationship enhancement for NB-IoT/eMTC | CATT | imported from 3GU |
R1‑2100368 | HARQ operation enhancement for NB-IoT/eMTC | CATT | imported from 3GU |
R1‑2100369 | DL 1024QAM for NR FR1 | CATT | imported from 3GU |
R1‑2100370 | Initial access aspects for up to 71GHz operation | CATT | imported from 3GU |
R1‑2100371 | PDCCH monitoring enhancements for up to 71GHz operation | CATT | imported from 3GU |
R1‑2100372 | Enhancements for PUCCH formats for up to 71GHz operation | CATT | imported from 3GU |
R1‑2100373 | Beam management for new SCSs for up to 71GHz operation | CATT | imported from 3GU |
R1‑2100374 | PDSCH/PUSCH enhancements for up to 71GHz operation | CATT | imported from 3GU |
R1‑2100375 | Channel access mechanism for up to 71GHz operation | CATT | imported from 3GU |
R1‑2100376 | UE feedback enhancements for HARQ-ACK | CATT | imported from 3GU |
R1‑2100377 | CSI feedback enhancements | CATT | imported from 3GU |
R1‑2100378 | Enhancements for unlicensed band URLLC/IIoT | CATT | imported from 3GU |
R1‑2100379 | Intra-UE multiplexing and prioritization | CATT | imported from 3GU |
R1‑2100380 | Discussion on propagation delay compensation enhancements | CATT | imported from 3GU |
R1‑2100381 | Timing relationship enhancement for NTN | CATT | imported from 3GU |
R1‑2100382 | UL time and frequency compensation for NTN | CATT | imported from 3GU |
R1‑2100383 | HARQ operation enhancement for NTN | CATT | imported from 3GU |
R1‑2100384 | Beam management and other aspects for NTN | CATT | imported from 3GU |
R1‑2100385 | Discussion on accuracy improvements by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | CATT | imported from 3GU |
R1‑2100386 | Discussion on accuracy improvements for UL-AoA positioning solutions | CATT | imported from 3GU |
R1‑2100387 | Discussion on accuracy improvements for DL-AoD positioning solutions | CATT | imported from 3GU |
R1‑2100388 | Potential techniques for Rel-17 positioning enhancements | CATT | imported from 3GU |
R1‑2100389 | Discussion on UE complexity reduction features | CATT | imported from 3GU |
R1‑2100390 | Discussion on high layer support for RedCap UE | CATT | imported from 3GU |
R1‑2100391 | Views on potential UE complexity reduction features | CATT | imported from 3GU |
R1‑2100392 | Paging enhancement for UE power saving | CATT | imported from 3GU |
R1‑2100393 | Configuration of TRS/CSI-RS for paging enhancement | CATT | imported from 3GU |
R1‑2100394 | Details of PEI configuration | CATT | imported from 3GU |
R1‑2100395 | PDCCH monitoring adaptation | CATT | imported from 3GU |
R1‑2100396 | System overhead analysis of PEI and TRS/CSI-RS for IDLE mode UE | CATT | imported from 3GU |
R1‑2100397 | Discussion on enhancements on PUSCH repetition type A | CATT | imported from 3GU |
R1‑2100398 | Discussion on TB processing over multi-slot PUSCH | CATT | imported from 3GU |
R1‑2100399 | Discussion on joint channel estimation for PUSCH | CATT | imported from 3GU |
R1‑2100400 | Discussion on PUCCH enhancements | CATT | imported from 3GU |
R1‑2100401 | Discussion on Type A PUSCH repetitions for Msg3 | CATT | imported from 3GU |
R1‑2100402 | Views on reusing PUSCH enhancements for Msg3 | CATT | imported from 3GU |
R1‑2100403 | Draft reply LS on use of simultaneous CSI-RS resources and ports | CATT | imported from 3GU |
R1‑2100404 | Discussion on UE FG ambiguity in case of cross-carrier operation | vivo | imported from 3GU |
R1‑2100405 | Discussion on PUSCH skipping with overlapping UCI on PUCCH in Rel-16 | vivo | imported from 3GU |
R1‑2100406 | Draft CR for Msg3 retransmission power control | vivo | imported from 3GU |
R1‑2100407 | Draft CR on PUCCH closed loop power control | vivo | imported from 3GU |
R1‑2100408 | Maintenance on HARQ operation for NR-U | vivo | imported from 3GU |
R1‑2100409 | TP on frequency hopping for NR-U configured grant | vivo | imported from 3GU |
R1‑2100410 | Maintenance on physical layer structure for NR sidelink | vivo | imported from 3GU |
R1‑2100411 | Maintenance on resource allocation mechanisms for NR sidelink | vivo | imported from 3GU |
R1‑2100412 | Maintenance on NR sidelink synchronization and procedures | vivo | imported from 3GU |
R1‑2100413 | Maintenance on UCI enhancements | vivo | imported from 3GU |
R1‑2100414 | Maintenance on Scheduling/HARQ | vivo | imported from 3GU |
R1‑2100415 | Maintenance on intra-UE prioritization | vivo | imported from 3GU |
R1‑2100416 | Maintenance on multi beam related issues | vivo | imported from 3GU |
R1‑2100417 | Maintenance on multi TRP | vivo | imported from 3GU |
R1‑2100418 | Maintenance on default QCL issues and multi TRP | vivo | imported from 3GU |
R1‑2100419 | Maintenance on Rel-16 NR positioning | vivo | imported from 3GU |
R1‑2100420 | Maintenance on MR-DC and CA enhancements | vivo | imported from 3GU |
R1‑2100421 | Further discussion on multi beam enhancement | vivo | imported from 3GU |
R1‑2100422 | Further discussion on enhancement of MTRP operation | vivo | imported from 3GU |
R1‑2100423 | Further discussion on inter-cell MTRP operation | vivo | imported from 3GU |
R1‑2100424 | Further discussion on MTRP multibeam enhancement | vivo | imported from 3GU |
R1‑2100425 | Further discussion and evaluation on HST-SFN schemes | vivo | imported from 3GU |
R1‑2100426 | Further discussion on SRS enhancement | vivo | imported from 3GU |
R1‑2100427 | Further discussion and evaluation on MTRP CSI and Partial reciprocity | vivo | imported from 3GU |
R1‑2100428 | Discussion on IRC receiver performance | vivo | imported from 3GU |
R1‑2100429 | Discussions on initial access aspects for NR operation from 52.6GHz to 71GHz | vivo | imported from 3GU |
R1‑2100430 | Discussions on PDCCH monitoring enhancements for NR operation from 52.6GHz to 71GHz | vivo | imported from 3GU |
R1‑2100431 | Discussions on PUCCH enhancements for NR operation from 52.6GHz to 71GHz | vivo | imported from 3GU |
R1‑2100432 | Discussions on beam management for new SCSs for NR operation from 52.6GHz to 71GHz | vivo | imported from 3GU |
R1‑2100433 | Discussions on PDSCH/PUSCH enhancements for NR operation from 52.6GHz to 71GHz | vivo | imported from 3GU |
R1‑2100434 | Discussions on channel access mechanism for NR operation from 52.6GHz to 71 GHz | vivo | imported from 3GU |
R1‑2100435 | Discussions on frequency range definition for 52.6-71GHz | vivo | imported from 3GU |
R1‑2100436 | HARQ-ACK enahncements for Rel-17 URLLC | vivo | imported from 3GU |
R1‑2100437 | CSI feedback enhancements for Rel-17 URLLC | vivo | imported from 3GU |
R1‑2100438 | Enhancements for unlicensed band URLLC/IIoT | vivo | imported from 3GU |
R1‑2100439 | Intra-UE Multiplexing/Prioritization for Rel-17 URLLC | vivo | imported from 3GU |
R1‑2100440 | Discussion on propagation delay compensation enhancements | vivo | imported from 3GU |
R1‑2100441 | Discussion on timing relationship enhancements for NR-NTN | vivo | imported from 3GU |
R1‑2100442 | Discussion on UL time and frequency synchronization enhancements for NR-NTN | vivo | imported from 3GU |
R1‑2100443 | Discussion on HARQ enhancements for NR-NTN | vivo | imported from 3GU |
R1‑2100444 | Discussion on other aspects for NR-NTN | vivo | imported from 3GU |
R1‑2100445 | Discussion on methods for RX/TX timing delay mitigating | vivo | imported from 3GU |
R1‑2100446 | Discussion on potential enhancements for UL-AoA method | vivo | imported from 3GU |
R1‑2100447 | Discussion on potential enhancements for DL-AoD method | vivo | imported from 3GU |
R1‑2100448 | Discussion on idle and inactive states positioning | vivo | imported from 3GU |
R1‑2100449 | Discussion on UE Complexity reduction | vivo, Guangdong Genius | imported from 3GU |
R1‑2100450 | Higher layer support for RedCap NR devices | vivo, Guangdong Genius | imported from 3GU |
R1‑2100451 | Discussion on reduced capability signalling | vivo, Guangdong Genius | imported from 3GU |
R1‑2100452 | Paging enhancements for idle/inactive mode UE power saving | vivo | imported from 3GU |
R1‑2100453 | TRS/CSI-RS occasion(s) for idle/inactive UEs | vivo | imported from 3GU |
R1‑2100454 | Discussion on paging grouping | vivo | imported from 3GU |
R1‑2100455 | Discussion on DCI-based power saving adaptation in connected mode | vivo | imported from 3GU |
R1‑2100456 | Discussion on RLM/BFD/RRM relaxation | vivo | imported from 3GU |
R1‑2100457 | Discussion on enhancement for PUSCH repetition type A | vivo | imported from 3GU |
R1‑2100458 | Discussion on PUSCH TB processing over multiple slots | vivo | imported from 3GU |
R1‑2100459 | Discussion on Joint channel estimation for PUSCH | vivo | imported from 3GU |
R1‑2100460 | Discussion on PUCCH enhancements | vivo | imported from 3GU |
R1‑2100461 | Discussion on Type A PUSCH repetitions for Msg3 | vivo | imported from 3GU |
R1‑2100462 | Enhanced Contention resolution mechanism for CBRA procedure with MSG3 PUSCH repetition | vivo | imported from 3GU |
R1‑2100463 | Enhancement to resource multiplexing between child and parent links | vivo | imported from 3GU |
R1‑2100464 | Other enhancements for simultaneous operation of child and parent links | vivo | imported from 3GU |
R1‑2100465 | Other enhancements to Rel-17 IAB nodes | vivo | imported from 3GU |
R1‑2100466 | Resource allocation for sidelink power saving | vivo | imported from 3GU |
R1‑2100467 | Discussion on mode-2 enhancements | vivo | imported from 3GU |
R1‑2100468 | Other aspects on SL enhancements | vivo | imported from 3GU |
R1‑2100469 | Discussion on mechanisms to support group scheduling for RRC_CONNECTED UEs | vivo | imported from 3GU |
R1‑2100470 | Discussion on mechanisms to improve reliability for RRC_CONNECTED UEs | vivo | imported from 3GU |
R1‑2100471 | Discussion on basic functions for broadcast/multicast for RRC_IDLE/RRC_INACTIVE Ues | vivo | imported from 3GU |
R1‑2100472 | Other issues for Rel-17 MBS | vivo | imported from 3GU |
R1‑2100473 | Discussion on Scell scheduling Pcell | vivo | imported from 3GU |
R1‑2100474 | Discussion on joint scheduling | vivo | imported from 3GU |
R1‑2100475 | Discussion on efficient activation/de-activation mechanism for Scells | vivo | imported from 3GU |
R1‑2100476 | Discussion on traffic models of XR | vivo | imported from 3GU |
R1‑2100477 | Discussion on evaluation methodologies of XR | vivo | imported from 3GU |
R1‑2100478 | Initial performance evaluation results of XR | vivo | imported from 3GU |
R1‑2100479 | Challenges and potential enhancements of XR | vivo | imported from 3GU |
R1‑2100480 | Discussion on scenarios applicable to NB-IoT/eMTC for NTN | vivo | imported from 3GU |
R1‑2100481 | Discussion on time and frequency synchronization enhancements on NB-IoT/eMTC for NTN | vivo | imported from 3GU |
R1‑2100482 | Discussion on timing relationship enhancements on NB-IoT/eMTC for NTN | vivo | imported from 3GU |
R1‑2100483 | Discussion on HARQ enhancements on NB-IoT/eMTC for NTN | vivo | imported from 3GU |
R1‑2100484 | On supporting DL 1024QAM for NR FR1 | vivo | imported from 3GU |
R1‑2100485 | INTELLIGENT PACKET REPETITION IN MOBILE SATELLITE SERVICE (MSS) LINKS TO OVERCOME CHANNEL BLOCKAGES | Ligado Networks | imported from 3GU |
R1‑2100486 | Power consumption reduction for sidelink resource allocation | FUTUREWEI | imported from 3GU |
R1‑2100487 | Discussion on PUCCH Channel enhancements | FUTUREWEI | imported from 3GU |
R1‑2100488 | Discussion on improving the accuracy of UL AoA positioning solutions | FUTUREWEI | imported from 3GU |
R1‑2100489 | Discussion on improving the accuracy of DL AoD positioning solutions | FUTUREWEI | imported from 3GU |
R1‑2100490 | Target of PUSCH Msg.3 coverage enhancements | SoftBank Corp. | imported from 3GU |
R1‑2100491 | Discussion on HARQ enhancement for NTN | BUPT | imported from 3GU |
R1‑2100492 | Discussion on resource allocation for power saving | Zhejiang Lab | imported from 3GU |
R1‑2100493 | Inter-UE coordination for mode 2 | Zhejiang Lab | imported from 3GU |
R1‑2100494 | Scenarios applicable to NB-IoT/eMTC | Zhejiang Lab | imported from 3GU |
R1‑2100495 | Timing relationship enhancements to support NB-IoT/eMTC in Non-Terrestrial Network | Zhejiang Lab | imported from 3GU |
R1‑2100496 | Timing relationship enhancements for NTN | Zhejiang Lab | imported from 3GU |
R1‑2100497 | Accuracy improvements for UL-AoA positioning solutions | BUPT | imported from 3GU |
R1‑2100498 | Extension to Rel-16 DCI-based power sabing adaptation during DRX Active Time | GDCNI | imported from 3GU |
R1‑2100499 | UE complexity reduction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100500 | Higher layer support of Reduced Capability NR Devices | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100501 | On physical layer aspects of small data transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100502 | On TCI state indication for Scells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100503 | On DC location reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100504 | On half-duplex operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100505 | DRAFT38.213CR, Correction to the configuration of half duplex operation for unpaired spectrum in CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100506 | Coverage recovery aspects for RedCap UEs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100507 | Support of 16-QAM for NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100508 | Support of 14-HARQ processes in DL for eMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100509 | Support of a maximum DL TBS of 1736 bits for eMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100510 | Group Scheduling Mechanisms to Support 5G Multicast / Broadcast Services for RRC_CONNECTED Ues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100511 | Reliability Improvements for RRC_CONNECTED UEs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100512 | Basic Functions for Broadcast / Multicast for RRC_IDLE / RRC_INACTIVE Ues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100513 | Draft reply LS on SL DRX design | LG Electronics | imported from 3GU |
R1‑2100514 | Discussion on essential corrections in physical layer structure | LG Electronics | imported from 3GU |
R1‑2100515 | Discussion on essential corrections in resource allocation for Mode 1 and 2 | LG Electronics | imported from 3GU |
R1‑2100516 | Discussion on essential corrections in physical layer procedure | LG Electronics | imported from 3GU |
R1‑2100517 | Discussion on resource allocation for power saving | LG Electronics | imported from 3GU |
R1‑2100518 | Discussion on feasibility and benefits for mode 2 enhancements | LG Electronics | imported from 3GU |
R1‑2100519 | Discussion on remaining aspects of sidelink evaluation methodology update for power saving | LG Electronics | imported from 3GU |
R1‑2100520 | Considerations on UL timing and frequency synchronization in NR NTN | THALES | imported from 3GU |
R1‑2100521 | Discussion on NB-IoT NTN scenarios with small satellites / CubeSats | Sateliot, Gatehouse | imported from 3GU |
R1‑2100522 | Remaining details of Rel-16 NR UE features | Ericsson | imported from 3GU |
R1‑2100523 | Discussion on power saving enhancements for paging | ZTE , Sanechips | imported from 3GU |
R1‑2100524 | TRS for RRC idle and inactive UEs | ZTE , Sanechips | imported from 3GU |
R1‑2100525 | Additional simulation results of UE power consumption in RRC idle and inactive state | ZTE , Sanechips | imported from 3GU |
R1‑2100526 | Extension to Rel-16 DCI-based power saving adaptation during DRX Active Time | ZTE , Sanechips | imported from 3GU |
R1‑2100527 | Further discussion on potential power saving schemes for RRC connected UEs | ZTE , Sanechips | imported from 3GU |
R1‑2100528 | Discussion on Traffic Model for XR evaluations | ZTE , Sanechips | imported from 3GU |
R1‑2100529 | On XR Evaluation Methodology | ZTE , Sanechips | imported from 3GU |
R1‑2100530 | Preliminary Performance Evaluation Results for XR | ZTE , Sanechips | imported from 3GU |
R1‑2100531 | Considerations on XR specific enhancements | ZTE , Sanechips | imported from 3GU |
R1‑2100532 | Discussion on DL 1024QAM for NR FR1 | ZTE , Sanechips | imported from 3GU |
R1‑2100533 | Discussion on NB-IoT NTN scenarios with small satellites | Sateliot, Gatehouse | imported from 3GU |
R1‑2100534 | Enhancements on multi-beam operation | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2100535 | On multi-TRP enhancements for PDCCH and PUSCH | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2100536 | CSI enhancements on Type II PS codebook and multi-TRP | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2100537 | On FDD channel reciprocity in real-world scenarios | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2100538 | Sidelink resource allocation for power saving | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100539 | Inter-UE coordination in mode 2 sidelink resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100540 | UL time synchronization acquisition for NTN | Mitsubishi Electric RCE | imported from 3GU |
R1‑2100541 | Initial access aspects | TCL Communication Ltd. | imported from 3GU |
R1‑2100542 | Channel access mechanism | TCL Communication Ltd. | imported from 3GU |
R1‑2100543 | Enhancements for unlicensed band URLLC/IIoT | TCL Communication Ltd. | imported from 3GU |
R1‑2100544 | Potential paging enhancements | TCL Communication Ltd. | imported from 3GU |
R1‑2100545 | TRS/CSI-RS occasion(s) for idle/inactive UEs | TCL Communication Ltd. | imported from 3GU |
R1‑2100546 | Resource allocation for power saving | TCL Communication Ltd. | imported from 3GU |
R1‑2100547 | Feasibility and benefits for mode 2 enhancements | TCL Communication Ltd. | imported from 3GU |
R1‑2100548 | Initial views on mitigating UE and gNB Rx/Tx timing errors | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100549 | Initial views on enhancing UL AoA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100550 | Initial views on enhancing DL AoD | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100551 | Additional views on positioning enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100552 | Draft CR on the usage of the term cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100553 | PT-RS enhancements for NR from 52.6GHz to 71GHz | Mitsubishi Electric RCE | imported from 3GU |
R1‑2100554 | Discussion on NR Rel-16 UE features | LG Electronics | imported from 3GU |
R1‑2100555 | Discussion on traffic model for XR study | LG Electronics | imported from 3GU |
R1‑2100556 | Discussion on evaluation assumption for XR study | LG Electronics | imported from 3GU |
R1‑2100557 | Reliability improvement for RRC_CONNECTED UEs in MBS | Potevio Company Limited | imported from 3GU |
R1‑2100558 | Potential techniques for PUSCH coverage enhancement | Potevio Company Limited | imported from 3GU |
R1‑2100559 | Clarification on power control for NB-IoT | ZTE | imported from 3GU |
R1‑2100560 | Clarification on DCI size alignment for MTC | ZTE | imported from 3GU |
R1‑2100561 | Corrections on scheduling enhancement for MTC | ZTE | imported from 3GU |
R1‑2100562 | Clarification on DCI size alignment for NB-IoT | ZTE | imported from 3GU |
R1‑2100563 | Corrections on scheduling enhancement for NB-IoT | ZTE | imported from 3GU |
R1‑2100564 | UE complexity reduction for Reduced Capability NR devices | ZTE | imported from 3GU |
R1‑2100565 | Higher layer support of Reduced Capability NR devices | ZTE | imported from 3GU |
R1‑2100566 | NR UE features for RedCap | ZTE | imported from 3GU |
R1‑2100567 | Discussion on UL and DL 16QAM for NB-IoT | ZTE | imported from 3GU |
R1‑2100568 | Support additional PDSCH scheduling delay for introduction of 14-HARQ processes in DL for eMTC | ZTE | imported from 3GU |
R1‑2100569 | DL TBS increase for eMTC | ZTE | imported from 3GU |
R1‑2100570 | Channel quality report for 16QAM in NB-IoT | ZTE | imported from 3GU |
R1‑2100571 | Discussion on XR applications and traffic models | InterDigital, Inc. | imported from 3GU |
R1‑2100572 | Discussion on Evaluation Methodology for XR | InterDigital, Inc. | imported from 3GU |
R1‑2100573 | Discussion on potential enhancements for supporting XR | InterDigital, Inc. | imported from 3GU |
R1‑2100574 | On UE feedback enhancements for HARQ-ACK | MediaTek Inc. | imported from 3GU |
R1‑2100575 | CSI feedback enhancements for URLLC | MediaTek Inc. | imported from 3GU |
R1‑2100576 | On the enhancements for unlicensed band URLLC/IIoT | MediaTek Inc. | imported from 3GU |
R1‑2100577 | Methods for intra-UE multiplexing and prioritization | MediaTek Inc. | imported from 3GU |
R1‑2100578 | Discussion on propagation delay compensation for time synchronization | MediaTek Inc. | imported from 3GU |
R1‑2100579 | On complexity reduction features for NR RedCap UEs | MediaTek Inc. | imported from 3GU |
R1‑2100580 | Clarification on back-to-back PUSCHs scheduling restriction in Rel-15 | MediaTek Inc. | imported from 3GU |
R1‑2100581 | Consideration on CQI report and Repetition applicability for 16QAM in R17 | MediaTek Inc. | imported from 3GU |
R1‑2100582 | Enhancements on Multi-TRP for PDCCH, PUSCH and PUCCH | MediaTek Inc. | imported from 3GU |
R1‑2100583 | CSI enhancement for NCJT and FR1 FDD reciprocity | MediaTek Inc. | imported from 3GU |
R1‑2100584 | Remaining issues on Rel-16 uplink power control for supporting NR-NR dual-connectivity | MediaTek Inc. | imported from 3GU |
R1‑2100585 | Remaining issues on Rel-16 carrier aggregation | MediaTek Inc. | imported from 3GU |
R1‑2100586 | On Evaluation Methodology for XR and CG | MediaTek Inc. | imported from 3GU |
R1‑2100587 | Initial Performance and Evaluation Results for XR and CG | MediaTek Inc. | imported from 3GU |
R1‑2100588 | Enhancement on multi-beam operation | MediaTek Inc. | imported from 3GU |
R1‑2100589 | Enhancements on beam management for multi-TRP | MediaTek Inc. | imported from 3GU |
R1‑2100590 | Enhancements on SRS flexibility, coverage and capacity | MediaTek Inc. | imported from 3GU |
R1‑2100591 | Design of paging early indication for idle/inactive-mode UE power saving | MediaTek Inc. | imported from 3GU |
R1‑2100592 | On TRS/CSI-RS occasion(s) for idle/inactive mode UE power saving | MediaTek Inc. | imported from 3GU |
R1‑2100593 | On enhancements to DCI-based UE power saving during DRX active time | MediaTek Inc. | imported from 3GU |
R1‑2100594 | Timing relationship enhancements for NR-NTN | MediaTek Inc. | imported from 3GU |
R1‑2100595 | UE Time and frequency Synchronisation for NR-NTN | MediaTek Inc. | imported from 3GU |
R1‑2100596 | HARQ in NR-NTN | MediaTek Inc. | imported from 3GU |
R1‑2100597 | Other Aspects of NR-NTN | MediaTek Inc. | imported from 3GU |
R1‑2100598 | Summary #1 of 8.4.4 Other Aspects of NR-NTN | MediaTek Inc. | imported from 3GU |
R1‑2100599 | Rel-17 IoT NTN Work Plan | MediaTek Inc. | imported from 3GU |
R1‑2100600 | IoT NTN scenarios | MediaTek Inc. | imported from 3GU |
R1‑2100601 | UE Time and frequency Synchronisation for IoT NTN | MediaTek Inc. | imported from 3GU |
R1‑2100602 | Timing relationship enhancements | MediaTek Inc. | imported from 3GU |
R1‑2100603 | Enhancement on HRQ | MediaTek Inc. | imported from 3GU |
R1‑2100604 | Others | MediaTek Inc. | imported from 3GU |
R1‑2100605 | On Enhancements of PDSCH Reference Signals | MediaTek Inc. | imported from 3GU |
R1‑2100606 | Discussion on Mode 2 enhancements | MediaTek Inc. | imported from 3GU |
R1‑2100607 | Initial access aspects for NR operations in 52.6-71 GHz | MediaTek Inc. | imported from 3GU |
R1‑2100608 | PDCCH monitoring enhancement for 52.6-71 GHz NR operation | MediaTek Inc. | imported from 3GU |
R1‑2100609 | PUCCH formats 0/1/4 enhancement for 52.6-71 GHz NR operation | MediaTek Inc. | imported from 3GU |
R1‑2100610 | Clarification on Numerology for Active DL and UL BWPs | MediaTek Inc. | imported from 3GU |
R1‑2100611 | On Multi-cell PDSCH Scheduling via Single DCI | MediaTek Inc. | imported from 3GU |
R1‑2100612 | Resource allocation for sidelink power saving | MediaTek Inc. | imported from 3GU |
R1‑2100613 | Discussion on NR MBS group scheduling for RRC_CONNECTED UEs | MediaTek Inc. | imported from 3GU |
R1‑2100614 | Discussion on HARQ operation for NR MBS reliable transmission | MediaTek Inc. | imported from 3GU |
R1‑2100615 | Common frequency resource for NR PTM transmission | MediaTek Inc. | imported from 3GU |
R1‑2100616 | Draft CR on prioritization between SRS and PUCCH | LG Electronics | imported from 3GU |
R1‑2100617 | Draft CR on multi-TRP/panel transmission | LG Electronics | imported from 3GU |
R1‑2100618 | Enhancements on Multi-beam Operation | LG Electronics | imported from 3GU |
R1‑2100619 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | LG Electronics | imported from 3GU |
R1‑2100620 | Enhancements on Multi-TRP inter-cell operation | LG Electronics | imported from 3GU |
R1‑2100621 | Enhancements on beam management for multi-TRP | LG Electronics | imported from 3GU |
R1‑2100622 | Enhancements on HST-SFN deployment | LG Electronics | imported from 3GU |
R1‑2100623 | Enhancements on SRS flexibility, coverage and capacity | LG Electronics | imported from 3GU |
R1‑2100624 | CSI enhancements for Rel-17 | LG Electronics | imported from 3GU |
R1‑2100625 | Discussion on RedCap features | NEC | imported from 3GU |
R1‑2100626 | UL enhancements for IIoT/URLLC in unlicensed controlled environment | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100627 | Discussion on LS on small data transmission | Intel Corporation | imported from 3GU |
R1‑2100628 | Remaining issues on NR-U | Intel Corporation | imported from 3GU |
R1‑2100629 | Correction to FD-OCC for PSCCH | Intel Corporation | imported from 3GU |
R1‑2100630 | Corrections to Mode-2 resource allocation | Intel Corporation | imported from 3GU |
R1‑2100631 | Corrections to sidelink procedures | Intel Corporation | imported from 3GU |
R1‑2100632 | On remaining details for handling CG-DG PUSCH overlaps | Intel Corporation | imported from 3GU |
R1‑2100633 | Correction for multi TRP PDCCH prioritization | Intel Corporation | imported from 3GU |
R1‑2100634 | Draft CR for clarification of scheme 2a/2b | Intel Corporation | imported from 3GU |
R1‑2100635 | Remaining issue on UE features | Intel Corporation | imported from 3GU |
R1‑2100636 | Enhancements to Multi-Beam Operations | Intel Corporation | imported from 3GU |
R1‑2100637 | Multi-TRP enhancements for PDCCH, PUCCH and PUSCH | Intel Corporation | imported from 3GU |
R1‑2100638 | Multi-TRP enhancements for inter-cell operation | Intel Corporation | imported from 3GU |
R1‑2100639 | Multi-TRP enhancements for beam management | Intel Corporation | imported from 3GU |
R1‑2100640 | Enhancements to HST-SFN deployments | Intel Corporation | imported from 3GU |
R1‑2100641 | Discussion on SRS enhancements | Intel Corporation | imported from 3GU |
R1‑2100642 | On CSI enhancements for MTRP and FDD | Intel Corporation | imported from 3GU |
R1‑2100643 | Discussion on initial access aspects for extending NR up to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2100644 | Discussion on PDCCH monitoring enhancements for extending NR up to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2100645 | Discussion on PUCCH enhancements for extending NR up to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2100646 | Discussion on Beam management aspects for extending NR up to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2100647 | Discussion on PDSCH/PUSCH enhancements for extending NR up to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2100648 | Discussion on channel access mechanism for extending NR up to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2100649 | UE HARQ feedback enhancements for URLLC/IIoT | Intel Corporation | imported from 3GU |
R1‑2100650 | CSI feedback enhancements for URLLC/IIoT | Intel Corporation | imported from 3GU |
R1‑2100651 | Discussion on enhancements to URLLC/IIoT in unlicensed band | Intel Corporation | imported from 3GU |
R1‑2100652 | Considerations on intra-UE multiplexing and prioritization | Intel Corporation | imported from 3GU |
R1‑2100653 | Propagation delay compensation analysis and design considerations | Intel Corporation | imported from 3GU |
R1‑2100654 | On timing relationship enhancements for NR NTN | Intel Corporation | imported from 3GU |
R1‑2100655 | On UL synchronization for NR NTN | Intel Corporation | imported from 3GU |
R1‑2100656 | On HARQ enhancements for NR NTN | Intel Corporation | imported from 3GU |
R1‑2100657 | Mitigation of UE and gNB Tx/Rx timing errors | Intel Corporation | imported from 3GU |
R1‑2100658 | NR positioning enhancements for UL-AoA method | Intel Corporation | imported from 3GU |
R1‑2100659 | NR positioning enhancements for DL-AoD method | Intel Corporation | imported from 3GU |
R1‑2100660 | On UE complexity reduction for RedCap devices | Intel Corporation | imported from 3GU |
R1‑2100661 | On higher layer support for RedCap devices | Intel Corporation | imported from 3GU |
R1‑2100662 | On paging enhancements for UE power saving | Intel Corporation | imported from 3GU |
R1‑2100663 | TRS/CSI-RS functionality during idle/inactive mode | Intel Corporation | imported from 3GU |
R1‑2100664 | Discussion on PDCCH monitoring reduction techniques during active time | Intel Corporation | imported from 3GU |
R1‑2100665 | Enhancements on PUSCH repetition type A | Intel Corporation | imported from 3GU |
R1‑2100666 | Discussion on TB processing over multi-slot PUSCH | Intel Corporation | imported from 3GU |
R1‑2100667 | Discussion on joint channel estimation for PUSCH | Intel Corporation | imported from 3GU |
R1‑2100668 | Discussion on PUCCH enhancements | Intel Corporation | imported from 3GU |
R1‑2100669 | On Msg3 PUSCH repetition | Intel Corporation | imported from 3GU |
R1‑2100670 | Enhancements to Resource Multiplexing between Child and Parent Links of an IAB Node | Intel Corporation | imported from 3GU |
R1‑2100671 | Other Enhancements for Simultaneous Operations | Intel Corporation | imported from 3GU |
R1‑2100672 | Design of sidelink power saving solutions | Intel Corporation | imported from 3GU |
R1‑2100673 | On feasibility and benefits of inter-UE coordination for sidelink mode-2 design | Intel Corporation | imported from 3GU |
R1‑2100674 | NR-MBS Group Scheduling for RRC_CONNECTED UEs | Intel Corporation | imported from 3GU |
R1‑2100675 | Mechanisms to Improve Reliability of NR-MBS for RRC_CONNECTED UEs | Intel Corporation | imported from 3GU |
R1‑2100676 | NR-MBS for RRC_IDLE/INACTIVE UEs | Intel Corporation | imported from 3GU |
R1‑2100677 | On SCell scheduling PCell transmissions | Intel Corporation | imported from 3GU |
R1‑2100678 | On 2-cell scheduling via single DCI | Intel Corporation | imported from 3GU |
R1‑2100679 | On efficient activation/de-activation for SCells | Intel Corporation | imported from 3GU |
R1‑2100680 | On traffic model for XR | Intel Corporation | imported from 3GU |
R1‑2100681 | On evaluation methodology for XR | Intel Corporation | imported from 3GU |
R1‑2100682 | Initial results for XR | Intel Corporation | imported from 3GU |
R1‑2100683 | On synchronization for NB-IoT and eMTC NTN | Intel Corporation | imported from 3GU |
R1‑2100684 | On timing relationship for NB-IoT and eMTC NTN | Intel Corporation | imported from 3GU |
R1‑2100685 | On HARQ enhancements for NB-IoT and eMTC NTN | Intel Corporation | imported from 3GU |
R1‑2100686 | Support of 1024QAM | Intel Corporation | imported from 3GU |
R1‑2100687 | Resource allocation mechanisms for power saving | Ericsson | imported from 3GU |
R1‑2100688 | Feasibility and benefits of mode 2 enhancements for inter-UE coordination | Ericsson | imported from 3GU |
R1‑2100689 | Remaining evaluation assumptions and methodology for power saving | Ericsson | imported from 3GU |
R1‑2100690 | Discussions on enhancements to resource multiplexing between child and parent links of an IAB node | CEWiT | imported from 3GU |
R1‑2100691 | Enhancements for unlicensed band URLLC/IIoT | NEC | imported from 3GU |
R1‑2100692 | Discussion on Intra-UE prioritization and multiplexing | NEC | imported from 3GU |
R1‑2100693 | Reduced PDCCH monitoring for REDCAP NR devices | NEC | imported from 3GU |
R1‑2100694 | Discussion on cross carrier scheduling for NR DSS | NEC | imported from 3GU |
R1‑2100695 | Discussion on efficient activation mechanism for SCells | NEC | imported from 3GU |
R1‑2100696 | Discussion on Sidelink Resource Allocation for Power Saving | Panasonic Corporation | imported from 3GU |
R1‑2100697 | Positioning enhancement by UE Assistance | TCL Communication Ltd. | imported from 3GU |
R1‑2100698 | Views on group scheduling for NR MBS | Google Inc. | imported from 3GU |
R1‑2100699 | Views on retransmission procedure for NR MBS | Google Inc. | imported from 3GU |
R1‑2100700 | Draft TP for half-duplex operation | ZTE | imported from 3GU |
R1‑2100701 | NR Sidelink Resource Allocation for UE Power Saving | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R1‑2100702 | Resource Allocation Enhancements for Mode 2 | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R1‑2100703 | Discussions on timing relationship enhancements in NTN | LG Electronics | imported from 3GU |
R1‑2100704 | Discussions on UL time and frequency synchronization enhancements in NTN | LG Electronics | imported from 3GU |
R1‑2100705 | Discussions on HARQ enhancements in NTN | LG Electronics | imported from 3GU |
R1‑2100706 | Discussions on other aspects of NTN | LG Electronics | imported from 3GU |
R1‑2100707 | Editorial CR on Rel-16 NR positioning | LG Electronics | imported from 3GU |
R1‑2100708 | Discussion on accuracy improvement by mitigating UE Rx/Tx and gNB Rx/Tx timing delays | LG Electronics | imported from 3GU |
R1‑2100709 | Discussion on accuracy improvement for UL-AoA positioning | LG Electronics | imported from 3GU |
R1‑2100710 | Discussion on accuracy improvement for DL-AoD positioning | LG Electronics | imported from 3GU |
R1‑2100711 | Discussion on latency and efficiency enhancement for NR positioning | LG Electronics | imported from 3GU |
R1‑2100712 | Discussions on PUSCH repetition type A enhancements | LG Electronics | imported from 3GU |
R1‑2100713 | Discussions on TB processing over multi-slot PUSCH | LG Electronics | imported from 3GU |
R1‑2100714 | Discussions on joint channel estimation for PUSCH | LG Electronics | imported from 3GU |
R1‑2100715 | Discussions on coverage enhancement for PUCCH | LG Electronics | imported from 3GU |
R1‑2100716 | Discussion on coverage enhancement for Msg3 PUSCH | LG Electronics | imported from 3GU |
R1‑2100717 | Discussions on IAB resource multiplexing enhancements | LG Electronics | imported from 3GU |
R1‑2100718 | Discussions on other enhancement for simultaneous operation | LG Electronics | imported from 3GU |
R1‑2100719 | Om cross-carrier scheduling from SCell to Pcell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100720 | On support of Single DCI scheduling two cells | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100721 | On low latency Scell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100722 | V2X channel model and scenario updates | GDCNI | imported from 3GU |
R1‑2100723 | Discussion on channel models for marine and inland river scenes | GDCNI | imported from 3GU |
R1‑2100724 | On Traffic Model for XR study | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100725 | Development of the Evaluation Methodology for XR Study | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100726 | Initial Performance Evaluation Results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100727 | [Draft] Reply LS on overlapped data and SR are of equal L1 priority | Nokia | imported from 3GU |
R1‑2100728 | HARQ-ACK Feedback Enhancements for URLLC/IIoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100729 | On UL intra-UE prioritization and multiplexing enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100730 | Discussion on enhancements for propagation delay compensation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100731 | PUSCH repetition for coverage enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2100732 | TB processing over multi-slot PUSCH | InterDigital, Inc. | imported from 3GU |
R1‑2100733 | Discussions on joint channel estimation for PUSCH | InterDigital, Inc. | imported from 3GU |
R1‑2100734 | A remaining issue on Mode-1 resource allocation for NR sidelink | Fujitsu | imported from 3GU |
R1‑2100735 | Remaining issues on physical layer procedures for NR sidelink | Fujitsu | imported from 3GU |
R1‑2100736 | A remaining issue on timing for applying SCell activation or deactivation | Fujitsu | imported from 3GU |
R1‑2100737 | Enhancements on Multi-beam Operation | Fujitsu | imported from 3GU |
R1‑2100738 | Enhancements on Multi-TRP for PDCCH PUCCH and PUSCH | Fujitsu | imported from 3GU |
R1‑2100739 | Enhancements on beam management for multi-TRP | Fujitsu | imported from 3GU |
R1‑2100740 | Considerations on initial access for NR from 52.6GHz to 71 GHz | Fujitsu | imported from 3GU |
R1‑2100741 | Considerations on multi-PDSCH/PUSCH with a single DCI and HARQ for NR from 52.6GHz to 71 GHz | Fujitsu | imported from 3GU |
R1‑2100742 | Considerations on channel access mechanism for NR from 52.6GHz to 71 GHz | Fujitsu | imported from 3GU |
R1‑2100743 | Views on TB processing over multi-slot PUSCH | Fujitsu | imported from 3GU |
R1‑2100744 | Other enhancements for simultaneous operation of IAB-node’s child and parent links | Fujitsu | imported from 3GU |
R1‑2100745 | Considerations on partial sensing and DRX in NR V2X | Fujitsu | imported from 3GU |
R1‑2100746 | Considerations on inter-UE coordination for mode 2 enhancements | Fujitsu | imported from 3GU |
R1‑2100747 | Discussions on PUCCH enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2100748 | Type A PUSCH repetitions for Msg3 | InterDigital, Inc. | imported from 3GU |
R1‑2100749 | Discussion on the number of HARQ processes for VoIP | InterDigital, Inc. | imported from 3GU |
R1‑2100750 | Accuracy improvements for DL-AoD positioning solutions | InterDigital, Inc. | imported from 3GU |
R1‑2100751 | Discussions on LOS/NLOS detection | InterDigital, Inc. | imported from 3GU |
R1‑2100752 | Techniques to improve accuracy in the presence of UE Rx/Tx and/or gNB Rx/Tx timing delays | InterDigital, Inc. | imported from 3GU |
R1‑2100753 | Discussions on techniques to improve accuracy for UL-AoA positioning solutions | InterDigital, Inc. | imported from 3GU |
R1‑2100754 | PUSCH skipping with UCI (without LCH and PHY prioritization) (Rel-16) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100755 | Channel access for multi-beam operation | PANASONIC | imported from 3GU |
R1‑2100756 | URLLC/IIoT PUSCH skipping (with LCH and/or PHY prioritization configured) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100757 | Discussion on NTN timing relationship | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100758 | Discussion on NTN uplink time synchronization | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100759 | Enhancements on HARQ for NTN | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100760 | Discussion on other aspects for NTN | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100761 | Corrections on multicast gap in Multiple TB | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100762 | Support 16QAM for NBIoT | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100763 | Time and frequency synchronization for IoT NTN | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100764 | Timing relationship enhancements for IoT NTN | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100765 | HARQ enhancement for IoT NTN | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100766 | Sidelink resource allocation for Power saving | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100767 | Sidelink resource allocation for Reliability enhancement | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100768 | Discussion on group scheduling mechanism for NR MBS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100769 | Discussion on reliability improvement for RRC-CONNECTED UEs | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100770 | Basic functions for broadcast/multicast in idle/inactive states | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100771 | Discussion on multi-cell PDSCH scheduling via a single DCI | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100772 | UE complexity reduction features for RedCap | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100773 | Higher layer support of Reduced Capability NR devices | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100774 | Market expectations for IoT over NTN | NOVAMINT | imported from 3GU |
R1‑2100775 | XR Traffic Model Considerations | AT&T | imported from 3GU |
R1‑2100776 | XR Evaluation Assumptions | AT&T | imported from 3GU |
R1‑2100777 | Enhancements for IAB resource multiplexing | AT&T | imported from 3GU |
R1‑2100778 | Enhancements for IAB interference management | AT&T | imported from 3GU |
R1‑2100779 | Enhancements on multi-beam operations | AT&T | imported from 3GU |
R1‑2100780 | Enhancements on beam management for multi-TRP | AT&T | imported from 3GU |
R1‑2100781 | Further Discussion of Initial Access Aspects | AT&T | imported from 3GU |
R1‑2100782 | Further Discussion of Channel Access Mechanisms | AT&T | imported from 3GU |
R1‑2100783 | Enhancements on Multi-beam Operation | Spreadtrum Communications | imported from 3GU |
R1‑2100784 | Discussion on enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | Spreadtrum Communications | imported from 3GU |
R1‑2100785 | Discussion on enhancement multi-TRP inter-cell operation | Spreadtrum Communications | imported from 3GU |
R1‑2100786 | Discussion on enhancements on beam management for multi-TRP | Spreadtrum Communications | imported from 3GU |
R1‑2100787 | Discussion on enhancements on HST-SFN deployment | Spreadtrum Communications | imported from 3GU |
R1‑2100788 | Considerations on SRS enhancement | Spreadtrum Communications | imported from 3GU |
R1‑2100789 | Discussion on CSI enhancement for multi-TRP and FR1 FDD reciprocity | Spreadtrum Communications | imported from 3GU |
R1‑2100790 | Discussion on CSI feedback enhancements | Spreadtrum Communications | imported from 3GU |
R1‑2100791 | Discussion on enhancements for unlicensed band URLLC/IIoT | Spreadtrum Communications | imported from 3GU |
R1‑2100792 | Remaining issues of PDCCH enhancements for URLLC | Spreadtrum Communications | imported from 3GU |
R1‑2100793 | Remaining issues of CG-PUSCH enhancements for URLLC | Spreadtrum Communications | imported from 3GU |
R1‑2100794 | Discussion on cross-carrier scheduling from SCell to PCell | Spreadtrum Communications | imported from 3GU |
R1‑2100795 | Discussion on efficient activation/de-activation mechanism for SCells in NR CA | Spreadtrum Communications | imported from 3GU |
R1‑2100796 | Discussion on UL skipping for CG PUSCH | Spreadtrum Communications | imported from 3GU |
R1‑2100797 | Considerations on joint channel estimation over multi-PUSCH | Spreadtrum Communications | imported from 3GU |
R1‑2100798 | Considerations on PUCCH coverage enhancement | Spreadtrum Communications | imported from 3GU |
R1‑2100799 | Remaining issues in NR sidelink mode 2 resource allocation | Spreadtrum Communications | imported from 3GU |
R1‑2100800 | Remaining issues on sidelink physical layer procedure | Spreadtrum Communications | imported from 3GU |
R1‑2100801 | Discussion on sidelink resource allocation for power saving | Spreadtrum Communications | imported from 3GU |
R1‑2100802 | Discussion on feasibility and benefit of mode 2 enhancements | Spreadtrum Communications | imported from 3GU |
R1‑2100803 | Discussion on physical Layer feedback enhancements | Spreadtrum Communications | imported from 3GU |
R1‑2100804 | Discussion on intra-UE multiplexing/prioritization | Spreadtrum Communications | imported from 3GU |
R1‑2100805 | Discussion on MBS group scheduling for RRC_CONNECTED UEs | Spreadtrum Communications | imported from 3GU |
R1‑2100806 | Mechanisms to improve reliability for RRC_CONNECTED UEs | Spreadtrum Communications | imported from 3GU |
R1‑2100807 | Consideration on timing relationship enhancements | Spreadtrum Communications | imported from 3GU |
R1‑2100808 | Consideration on enhancements on UL time and frequency synchronization | Spreadtrum Communications | imported from 3GU |
R1‑2100809 | Consideration on enhancements on HARQ | Spreadtrum Communications | imported from 3GU |
R1‑2100810 | Consideration on enhancements to time and frequency synchronization | Spreadtrum Communications | imported from 3GU |
R1‑2100811 | Consideration on timing relationship enhancements | Spreadtrum Communications | imported from 3GU |
R1‑2100812 | Consideration on enhancements on HARQ | Spreadtrum Communications | imported from 3GU |
R1‑2100813 | Consideration on other design aspects for IOT NTN | Spreadtrum Communications | imported from 3GU |
R1‑2100814 | Consideration on TRS/CSI-RS occasion(s) for idle/inactive UEs | Spreadtrum Communications | imported from 3GU |
R1‑2100815 | Discussion on power saving techniques for connected-mode UEs | Spreadtrum Communications | imported from 3GU |
R1‑2100816 | Discussion on other power saving techniques | Spreadtrum Communications | imported from 3GU |
R1‑2100817 | Discussion on PDCCH monitoring enhancement for NR beyond 52.6 GHz | Spreadtrum Communications | imported from 3GU |
R1‑2100818 | Maintenance of DL signals and channels for NR-U | Spreadtrum Communications | imported from 3GU |
R1‑2100819 | Discussion on enhancements for PUCCH format 0/1/4 for above 52.6GHz | Spreadtrum Communications | imported from 3GU |
R1‑2100820 | Discussion on PDSCH and PUSCH enhancements for above 52.6GHz | Spreadtrum Communications | imported from 3GU |
R1‑2100821 | Discussion on channel access mechanism for above 52.6GHz | Spreadtrum Communications | imported from 3GU |
R1‑2100822 | Discussion on Higher layer support of RedCap UE | Spreadtrum Communications | imported from 3GU |
R1‑2100823 | Discussion on UE complexity reduction features | Spreadtrum Communications | imported from 3GU |
R1‑2100824 | Discussion on potential paging enhancements | Spreadtrum Communications | imported from 3GU |
R1‑2100825 | Discussion on initial access aspects for NR from 52.6GHz to 71GHz | Spreadtrum Communications | imported from 3GU |
R1‑2100826 | Maintenance of Rel-16 URLLC intra-UE and inter-UE prioritization/ multiplexing enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100827 | Draft CRs on timing of SCell activation/deactivation for sub-slot PUCCH and number of PUCCHs with HARQ-ACK in a slot/sub-slot | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100828 | Inter-UE coordination for enhanced resource allocation | Mitsubishi Electric RCE | imported from 3GU |
R1‑2100829 | PUSCH skipping | InterDigital, Inc. | imported from 3GU |
R1‑2100830 | CSI feedback enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2100831 | Intra-UE Multiplexing/Prioritization | InterDigital, Inc. | imported from 3GU |
R1‑2100832 | Reply LS on SA WG2 assumptions AN-PDB and PER targets for satellite access | THALES | imported from 3GU |
R1‑2100833 | Enhancements for resource multiplexing among IAB backhaul and access links | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100834 | Other enhancements for simultaneous operation of IAB Parent and Child | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100835 | CSI feedback enhancements for URLLC/IIoT use cases | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2100836 | Discussions on initial access aspects | InterDigital, Inc. | imported from 3GU |
R1‑2100837 | Discussions on PDCCH monitoring enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2100838 | Discussions on enhancements for PUCCH formats 0/1/4 | InterDigital, Inc. | imported from 3GU |
R1‑2100839 | Discussions on beam management for new SCSs | InterDigital, Inc. | imported from 3GU |
R1‑2100840 | Discussions on PDSCH/PUSCH enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2100841 | Discussion on channel access mechanisms | InterDigital, Inc. | imported from 3GU |
R1‑2100842 | Efficient beam management based on FR2 | InterDigital, Inc. | imported from 3GU |
R1‑2100843 | UE complexity reduction | Panasonic Corporation | imported from 3GU |
R1‑2100844 | Further enhancement on multi-beam operation | Sony | imported from 3GU |
R1‑2100845 | Considerations on Multi-TRP for PDCCH, PUCCH, PUSCH | Sony | imported from 3GU |
R1‑2100846 | Considerations on inter-cell operation | Sony | imported from 3GU |
R1‑2100847 | Considerations on beam management for multi-TRP | Sony | imported from 3GU |
R1‑2100848 | Considerations on HST-SFN operation for multi-TRP | Sony | imported from 3GU |
R1‑2100849 | Considerations on SRS flexibility, coverage and capacity | Sony | imported from 3GU |
R1‑2100850 | Further considerations on CSI enhancements | Sony | imported from 3GU |
R1‑2100851 | PDCCH enhancement for NR from 52.6GHz to 71GHz | Sony | imported from 3GU |
R1‑2100852 | Beam management enhancement for NR from 52.6GHz to 71GHz | Sony | imported from 3GU |
R1‑2100853 | PDSCH/PUSCH enhancements for NR from 52.6GHz to 71GHz | Sony | imported from 3GU |
R1‑2100854 | Channel access mechanism for 60 GHz unlicensed spectrum | Sony | imported from 3GU |
R1‑2100855 | Considerations on HARQ-ACK enhancements for URLLC | Sony | imported from 3GU |
R1‑2100856 | Considerations on CSI feedback enhancements | Sony | imported from 3GU |
R1‑2100857 | Considerations on unlicensed URLLC | Sony | imported from 3GU |
R1‑2100858 | Considerations on intra-UE UL multiplexing | Sony | imported from 3GU |
R1‑2100859 | Calculation of timing relationship offsets | Sony | imported from 3GU |
R1‑2100860 | Enhancement for UL time synchronization | Sony | imported from 3GU |
R1‑2100861 | Enhancements on HARQ for NTN | Sony | imported from 3GU |
R1‑2100862 | Discussion on beam management and polarization for NTN | Sony | imported from 3GU |
R1‑2100863 | Discussion on accuracy improvements for UL-AoA positioning method | Sony | imported from 3GU |
R1‑2100864 | Discussion on accuracy improvements for DL-AoD positioning method | Sony | imported from 3GU |
R1‑2100865 | UE complexity reduction for Redcap devices | Sony | imported from 3GU |
R1‑2100866 | Paging enhancement in Idle/Inactive state | Sony | imported from 3GU |
R1‑2100867 | Discussion on TRS/CSI-RS occasion(s) for idle/inactive UEs | Sony | imported from 3GU |
R1‑2100868 | Association of dual polarized SSBs | Sony | imported from 3GU |
R1‑2100869 | Support of 1736 bit maximum DL TBS for eMTC | Sony | imported from 3GU |
R1‑2100870 | Discussion on sidelink resource allocation for power saving | Sony | imported from 3GU |
R1‑2100871 | Discussion on reliability and latency enhancements for mode 2 | Sony | imported from 3GU |
R1‑2100872 | Considerations on MBS group scheduling for RRC_CONNECTED UEs | Sony | imported from 3GU |
R1‑2100873 | Considerations on MBS functions for RRC_IDLE UEs | Sony | imported from 3GU |
R1‑2100874 | Scenarios for IoT-NTN | Sony | imported from 3GU |
R1‑2100875 | Time and frequency synchronisation enhancements for IoT-NTN | Sony | imported from 3GU |
R1‑2100876 | Timing relationship for IoT-NTN | Sony | imported from 3GU |
R1‑2100877 | HARQ issues for IoT-NTN | Sony | imported from 3GU |
R1‑2100878 | Power consumption of IoT-NTN | Sony | imported from 3GU |
R1‑2100879 | Discussion on XR Applications and Evaluation Assumptions | Sony | imported from 3GU |
R1‑2100880 | Discussion on UE feedback enhancement for HARQ-ACK | LG Electronics | imported from 3GU |
R1‑2100881 | Discussion on CSI feedback enhancements for URLLC | LG Electronics | imported from 3GU |
R1‑2100882 | Discussion on unlicensed band URLLC/IIOT | LG Electronics | imported from 3GU |
R1‑2100883 | Discussion on Intra-UE multiplexing/prioritization | LG Electronics | imported from 3GU |
R1‑2100884 | Discussion on propagation delay compensation enhancements | LG Electronics | imported from 3GU |
R1‑2100885 | Discussion on cross-carrier scheduling from SCell to Pcell | LG Electronics | imported from 3GU |
R1‑2100886 | Discussion on multi-cell PDSCH scheduling via a single DCI | LG Electronics | imported from 3GU |
R1‑2100887 | Draft reply LS on Rel-16 updated RAN4 UE features lists for LTE and NR | LG Electronics | imported from 3GU |
R1‑2100888 | Discussion on RAN4 LS on measuring CSI-RS during SCell activation | LG Electronics | imported from 3GU |
R1‑2100889 | Discussion on RAN2 LS on capability for extended RAR window monitoring | LG Electronics | imported from 3GU |
R1‑2100890 | Remaining issues of channel access procedure and DL signals and channels for NR-U | LG Electronics | imported from 3GU |
R1‑2100891 | Remaining issues of HARQ procedure for NR-U | LG Electronics | imported from 3GU |
R1‑2100892 | Initial access aspects to support NR above 52.6 GHz | LG Electronics | imported from 3GU |
R1‑2100893 | PDCCH monitoring enhancements to support NR above 52.6 GHz | LG Electronics | imported from 3GU |
R1‑2100894 | Enhancements for PUCCH formats 0/1/4 to support NR above 52.6 GHz | LG Electronics | imported from 3GU |
R1‑2100895 | Enhancements for beam management to support NR above 52.6 GHz | LG Electronics | imported from 3GU |
R1‑2100896 | PDSCH/PUSCH enhancements to support NR above 52.6 GHz | LG Electronics | imported from 3GU |
R1‑2100897 | Channel access mechanism to support NR above 52.6 GHz | LG Electronics | imported from 3GU |
R1‑2100898 | PHR issues related to URLLC/IIOT WI | LG Electronics | imported from 3GU |
R1‑2100899 | Remaining issues of other aspects for URLLC/IIOT | LG Electronics | imported from 3GU |
R1‑2100900 | Discussion on complexity reduction of reduced capability NR devices | LG Electronics | imported from 3GU |
R1‑2100901 | Higher layer support for reduced capability NR devices | LG Electronics | imported from 3GU |
R1‑2100902 | Other aspects of reduced capability NR devices | LG Electronics | imported from 3GU |
R1‑2100903 | Discussion on potential paging enhancements | LG Electronics | imported from 3GU |
R1‑2100904 | Discussion on TRS/CSI-RS occasion(s) for idle/inactive UEs | LG Electronics | imported from 3GU |
R1‑2100905 | Discussion on DCI-based power saving adaptation during DRX ActiveTime | LG Electronics | imported from 3GU |
R1‑2100906 | Support of group scheduling for RRC_CONNECTED UEs | LG Electronics | imported from 3GU |
R1‑2100907 | Mechanisms to improve reliability of Broadcast/Multicast service | LG Electronics | imported from 3GU |
R1‑2100908 | Basic function for broadcast/multicast | LG Electronics | imported from 3GU |
R1‑2100909 | Other aspects for MBS | LG Electronics | imported from 3GU |
R1‑2100910 | Discussion on physical layer aspects of small data transmission | LG Electronics | imported from 3GU |
R1‑2100911 | Discussion on UE feedback enhancements for HARQ-ACK | China Telecom | imported from 3GU |
R1‑2100912 | Discussion on Timing Relationship Enhancements in NR-NTN | China Telecom | imported from 3GU |
R1‑2100913 | Discussion on HARQ Enhancements in NR-NTN | China Telecom | imported from 3GU |
R1‑2100914 | Work plan for Rel-17 WI on NR coverage enhancements | China Telecom | imported from 3GU |
R1‑2100915 | Enhancements on PUSCH repetition type A | China Telecom | imported from 3GU |
R1‑2100916 | Discussion on TB processing over multi-slot PUSCH | China Telecom | imported from 3GU |
R1‑2100917 | Discussion on joint channel estimation for PUSCH | China Telecom | imported from 3GU |
R1‑2100918 | Discussion on PUCCH enhancements | China Telecom | imported from 3GU |
R1‑2100919 | Discussion on type A PUSCH repetitions for Msg3 | China Telecom | imported from 3GU |
R1‑2100920 | UE feedback enhancements for HARQ-ACK | TCL Communication Ltd. | imported from 3GU |
R1‑2100921 | Intra-UE Multiplexing and Prioritization | TCL Communication Ltd. | imported from 3GU |
R1‑2100922 | On timing relationship enhancements for NTN | Ericsson | imported from 3GU |
R1‑2100923 | [draft]Reply LS to RAN2 on sidelink DRX | ZTE, Sanechips | imported from 3GU |
R1‑2100924 | Discussion on sidelink power saving | ZTE, Sanechips | imported from 3GU |
R1‑2100925 | Discussion on inter-UE coordination | ZTE, Sanechips | imported from 3GU |
R1‑2100926 | Discussion on remaining issues for sidelink evaluation methodology | ZTE, Sanechips | imported from 3GU |
R1‑2100927 | On UL time and frequency synchronization enhancements for NTN | Ericsson | imported from 3GU |
R1‑2100928 | On HARQ enhancements for NTN | Ericsson | imported from 3GU |
R1‑2100929 | On other enhancements for NTN | Ericsson | imported from 3GU |
R1‑2100930 | On scenarios and evaluations for NB-IoT and eMTC based NTN | Ericsson | imported from 3GU |
R1‑2100931 | On time and frequency synchronization enhancements for IoT NTN | Ericsson | imported from 3GU |
R1‑2100932 | On timing relationship enhancements for IoT NTN | Ericsson | imported from 3GU |
R1‑2100933 | On HARQ enhancements for IoT NTN | Ericsson | imported from 3GU |
R1‑2100934 | On evaluation assumptions for NB-IoT and eMTC based NTN | Ericsson | imported from 3GU |
R1‑2100935 | [Draft] Reply LS on SL switching priority | ZTE, Sanechips | imported from 3GU |
R1‑2100936 | Remaining issues on sidelink synchronization | ZTE, Sanechips | imported from 3GU |
R1‑2100937 | Remaining issues on mode1 | ZTE, Sanechips | imported from 3GU |
R1‑2100938 | The slot set for SL resource allocation procedure | ZTE, Sanechips | imported from 3GU |
R1‑2100939 | Discussion on initial access aspects supporting NR from 52.6 to 71GHz | NEC | imported from 3GU |
R1‑2100940 | PDSCH enhancements on supporting NR from 52.6GHz to 71 GHz | NEC | imported from 3GU |
R1‑2100941 | Discussion on channel access mechanism supporting NR from 52.6 to 71GHz | NEC | imported from 3GU |
R1‑2100942 | Discussion on enhancements on PUSCH repetition type A | NEC | imported from 3GU |
R1‑2100943 | Discussion on TB processing over multi-slot PUSCH | NEC | imported from 3GU |
R1‑2100944 | Discussion on PUSCH repetitions for Msg3 | NEC | imported from 3GU |
R1‑2100945 | Remaining issues on resource allocation mode 2 | NEC | imported from 3GU |
R1‑2100946 | Discussion on resource allocation for power saving | NEC | imported from 3GU |
R1‑2100947 | Discussion on feasibility and benefits for mode 2 enhancements | NEC | imported from 3GU |
R1‑2100948 | UE feedback enhancements for HARQ-ACK | NEC | imported from 3GU |
R1‑2100949 | Discussion on multi-beam operation | NEC | imported from 3GU |
R1‑2100950 | Discussion on multi-TRP for PDCCH, PUCCH and PUSCH | NEC | imported from 3GU |
R1‑2100951 | Discussion on beam management for multi-TRP | NEC | imported from 3GU |
R1‑2100952 | Discussion on HST-SFN deployment | NEC | imported from 3GU |
R1‑2100953 | Discussion on SRS enhancement | NEC | imported from 3GU |
R1‑2100954 | Discussion on CSI enhancement for multi-TRP | NEC | imported from 3GU |
R1‑2100955 | Discussion on simultaneous operation of IAB-node’s child and parent links | CEWiT | imported from 3GU |
R1‑2100956 | Discussion on group scheduling mechanism for RRC_CONNECTED UEs | ETRI | imported from 3GU |
R1‑2100957 | Discussion on mechanisms to improve reliability for RRC_CONNECTED UEs | ETRI | imported from 3GU |
R1‑2100958 | Enhancements to the IAB resource multiplexing | ZTE, Sanechips | imported from 3GU |
R1‑2100959 | Enhancements for simultaneous operation of child and parent links | ZTE, Sanechips | imported from 3GU |
R1‑2100960 | Discussion on multiplexing capability for IAB | ZTE, Sanechips | imported from 3GU |
R1‑2100961 | About reply LS on inter-donor topology redundancy in IAB | ZTE, Sanechips | imported from 3GU |
R1‑2100962 | Discussion on resource allocation for power saving | Hyundai Motors | imported from 3GU |
R1‑2100963 | Discussion on feasibility and benefits for mode 2 enhancements | Hyundai Motors | imported from 3GU |
R1‑2100964 | Discussion on Enhancements for Multi-beam Operation | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100965 | Discussion on Enhancements on Multi-TRP for Uplink Channels | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100966 | Discussion of enhancements on Multi-TRP inter-cell operation | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100967 | Discussion of enhancements on beam management for Multi-TRP | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100968 | Discussion on UE feedback enhancements for HARQ-ACK | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100969 | Discussion on UE complexity reduction | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100970 | Discussion on Intra-UE multiplexing/prioritization | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100971 | Timing relationship enhancements in NTN | Asia Pacific Telecom, FGI, III, ITRI | imported from 3GU |
R1‑2100972 | UL time and frequency synchronization in NTN | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100973 | Enhancements on HARQ in NTN | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100974 | Scrambling sequence enhancement in NTN | Asia Pacific Telecom, FGI, ITRI | imported from 3GU |
R1‑2100975 | Scenarios applicable to NB-IoT in NTN | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100976 | Time and frequency synchronization to NB-IoT in NTN | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100977 | Timing relationship enhancements to NB-IoT in NTN | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100978 | Enhancements on HARQ to NB-IoT in NTN | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100979 | NB-IoT modifications to support the NTN deployment | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100980 | Discussion on extension(s) to Rel-16 DCI-based power saving adaptation | Asia Pacific Telecom, FGI | imported from 3GU |
R1‑2100981 | Resource allocation for power saving | InterDigital, Inc. | imported from 3GU |
R1‑2100982 | On inter-UE coordination for Mode 2 enhancement | InterDigital, Inc. | imported from 3GU |
R1‑2100983 | On SL multi-carrier operation and remaining issues for simulation methodology update | InterDigital, Inc. | imported from 3GU |
R1‑2100984 | On timing relationship for NTN | InterDigital, Inc. | imported from 3GU |
R1‑2100985 | On UL time/frequency synchronization for NTN | InterDigital, Inc. | imported from 3GU |
R1‑2100986 | On HARQ enhancement for NTN | InterDigital, Inc. | imported from 3GU |
R1‑2100987 | On feeder link switch and beam management for NTN | InterDigital, Inc. | imported from 3GU |
R1‑2100988 | Enhancements for HST-SFN deployment | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100989 | CSI enhancements for mTRP and FDD reciprocity | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100990 | Resource multiplexing in enhanced IAB systems | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100991 | Timing, interference, and power control in enhanced IAB systems | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100992 | Cross-carrier scheduling (from Scell to Pcell) | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100993 | HARQ-ACK feedback enhancement for IIoT/URLLC | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100994 | CSI feedback enhancements for IIoT/URLLC | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100995 | Enhancements for unlicensed band IIoT/URLLC | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100996 | Intra-UE multiplexing enhancement for IIoT/URLLC | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100997 | PDCCH monitoring at reduced capability UE | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100998 | Paging enhancement for UE power saving | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2100999 | Provision of TRS/CSI-RS for idle/inactive UEs | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101000 | Enhanced DCI based power saving adaptation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101001 | Enhancements on PUSCH repetition type A | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101002 | Enhancements for TB processing over multi-slot PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101003 | Enhancements for DM-RS bundling for multiple PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101004 | Mode 2 enhancements in sidelink | Panasonic Corporation | imported from 3GU |
R1‑2101005 | Enhancements on Multi-beam Operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101006 | Enhancements for Multi-TRP URLLC schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101007 | Enhancements to enable inter-cell multi-TRP operations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101008 | Enhancements on Beam Management for Multi-TRP/Panel Transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101009 | Enhancements for HST-SFN deployment | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101010 | Enhancements on SRS flexibility, coverage and capacity | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101011 | Enhancement on CSI measurement and reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101012 | Feasibility of the large, single-beam small sats / CubeSats scenario | THALES | imported from 3GU |
R1‑2101013 | Discussion on UE feedback enhancements for HARQ-ACK | Panasonic Corporation | imported from 3GU |
R1‑2101014 | Discussion on CSI feedback enhancements | Panasonic Corporation | imported from 3GU |
R1‑2101015 | Enhancements for unlicensed band URLLC/IIoT | Panasonic Corporation | imported from 3GU |
R1‑2101016 | Discussion on Intra-UE multiplexing and prioritization of different priority | Panasonic Corporation | imported from 3GU |
R1‑2101017 | Discussion on enhancements on PUSCH repetition Type A | Panasonic Corporation | imported from 3GU |
R1‑2101018 | Discussion on TB processing over multi-slot PUSCH | Panasonic Corporation | imported from 3GU |
R1‑2101019 | Feasibility of the large, single-beam small sats / CubeSats scenario | Thales, Sateliot, GateHouse | imported from 3GU |
R1‑2101020 | Discussion on joint channel estimation for PUSCH | Panasonic Corporation | imported from 3GU |
R1‑2101021 | Discussion on PUCCH enhancement for NR coverage enhancement | Panasonic Corporation | imported from 3GU |
R1‑2101022 | Discussion on Type A PUSCH repetitions for Msg.3 | Panasonic Corporation | imported from 3GU |
R1‑2101023 | Discussion on multi-beam operation | ASUSTeK | imported from 3GU |
R1‑2101024 | NTN Timing relationship enhancement | Panasonic Corporation | imported from 3GU |
R1‑2101025 | HARQ enhancement for NTN | Panasonic Corporation | imported from 3GU |
R1‑2101026 | Discussion on beam management for multi-TRP | ASUSTeK | imported from 3GU |
R1‑2101027 | Scenarios and evalutions for NB-IoT/eMTC over NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101028 | Enhancements to time and frequency synchronization for NB-IoT/eMTC over NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101029 | Timing relationship enhancements for NB-IoT/eMTC over NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101030 | HARQ for NB-IoT/eMTC over NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101031 | Link budget analysis for UE power class 6 for NB-IoT/eMTC over NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101032 | Enhancements on multi-beam operation | CMCC | imported from 3GU |
R1‑2101033 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | CMCC | imported from 3GU |
R1‑2101034 | Enhancements on Multi-TRP inter-cell operation | CMCC | imported from 3GU |
R1‑2101035 | Enhancements on beam management for multi-TRP | CMCC | imported from 3GU |
R1‑2101036 | Enhancements on HST-SFN deployment | CMCC | imported from 3GU |
R1‑2101037 | Enhancements on SRS flexibility, coverage and capacity | CMCC | imported from 3GU |
R1‑2101038 | Enhancements on CSI reporting for Multi-TRP | CMCC | imported from 3GU |
R1‑2101039 | Discussion on UE feedback enhancements for HARQ-ACK | CMCC | imported from 3GU |
R1‑2101040 | Discussion on CSI feedback enhancements for URLLC | CMCC | imported from 3GU |
R1‑2101041 | Discussion on intra-UE multiplexing or prioritization | CMCC | imported from 3GU |
R1‑2101042 | Discussion on timing relationship enhancements for NTN | CMCC | imported from 3GU |
R1‑2101043 | Enhancements on UL time and frequency synchronization for NTN | CMCC | imported from 3GU |
R1‑2101044 | Enhancements on HARQ for NTN | CMCC | imported from 3GU |
R1‑2101045 | Other Aspects for NTN | CMCC | imported from 3GU |
R1‑2101046 | Discussion on gNB/UE Rx/Tx timing delay mitigation solutions | CMCC | imported from 3GU |
R1‑2101047 | Discussion on UL-AoA enhancement | CMCC | imported from 3GU |
R1‑2101048 | Discussion on DL-AoD enhancement | CMCC | imported from 3GU |
R1‑2101049 | Discussion on UE complexity reduction | CMCC | imported from 3GU |
R1‑2101050 | Discussion on early identification of RedCap UEs | CMCC | imported from 3GU |
R1‑2101051 | Discussion on network access control of RedCap devices | CMCC | imported from 3GU |
R1‑2101052 | Discussion on paging early indication design | CMCC | imported from 3GU |
R1‑2101053 | Discussion on TRS/CSI-RS occasion(s) for IDLE/INACTIVE-mode UEs | CMCC | imported from 3GU |
R1‑2101054 | Discussion on PDCCH monitoring reduction during DRX active time | CMCC | imported from 3GU |
R1‑2101055 | Discussion on enhancements on PUSCH repetition type A | CMCC | imported from 3GU |
R1‑2101056 | Discussion on TB processing over multi-slot PUSCH | CMCC | imported from 3GU |
R1‑2101057 | Discussion on joint channel estimation for PUSCH | CMCC | imported from 3GU |
R1‑2101058 | Discussion on PUCCH enhancements | CMCC | imported from 3GU |
R1‑2101059 | Discussion on type A PUSCH repetitions for Msg3 | CMCC | imported from 3GU |
R1‑2101060 | Discussion on resource allocation for power saving | CMCC | imported from 3GU |
R1‑2101061 | Discussion on reliability and latency enhancements for mode-2 resource allocation | CMCC | imported from 3GU |
R1‑2101062 | Updated NR MBS work plan | CMCC | imported from 3GU |
R1‑2101063 | Discussion on group scheduling mechanisms | CMCC | imported from 3GU |
R1‑2101064 | Discussion on reliability improvement | CMCC | imported from 3GU |
R1‑2101065 | Discussion on NR MBS in RRC_IDLE/ RRC_INACTIVE states | CMCC | imported from 3GU |
R1‑2101066 | Discussion on cross-carrier scheduling from SCell to Pcell | CMCC | imported from 3GU |
R1‑2101067 | Discussion on efficient activation/de-activation mechanism for SCells | CMCC | imported from 3GU |
R1‑2101068 | Discussion on XR evaluation | CMCC | imported from 3GU |
R1‑2101069 | Discussion on scenarios for IoT NTN | CMCC | imported from 3GU |
R1‑2101070 | Discussion on enhancements for IoT NTN | CMCC | imported from 3GU |
R1‑2101071 | Discussion on DL 1024QAM for NR FR1 | CMCC | imported from 3GU |
R1‑2101072 | Remaining issues on UL transmissions | ETRI | imported from 3GU |
R1‑2101073 | Remaining issues on resource allocation mode 2 for NR V2X | ETRI | imported from 3GU |
R1‑2101074 | Enhancements on beam management for multi-TRP | ETRI | imported from 3GU |
R1‑2101075 | UE feedback enhancements for HARQ-ACK | ETRI | imported from 3GU |
R1‑2101076 | Enhancements for unlicensed band URLLC/IIoT | ETRI | imported from 3GU |
R1‑2101077 | Intra-UE Multiplexing/Prioritization | ETRI | imported from 3GU |
R1‑2101078 | Propagation delay compensation enhancements | ETRI | imported from 3GU |
R1‑2101079 | Discussion on UL timing synchronization for NTN | ETRI | imported from 3GU |
R1‑2101080 | Discussion on HARQ Enhancements for NTN | ETRI | imported from 3GU |
R1‑2101081 | PUCCH enhancements | ETRI | imported from 3GU |
R1‑2101082 | PUSCH coverage enhancement | ETRI | imported from 3GU |
R1‑2101083 | Discussion on IAB resource multiplexing enhancements | ETRI | imported from 3GU |
R1‑2101084 | Discussion on simultaneous operation enhancements for eIAB | ETRI | imported from 3GU |
R1‑2101085 | Other enhancements to eIAB | ETRI | imported from 3GU |
R1‑2101086 | Discussion on resource allocation for power saving | ETRI | imported from 3GU |
R1‑2101087 | Discussion on feasibility and benefits for mode 2 enhancements | ETRI | imported from 3GU |
R1‑2101088 | Cross-carrier scheduling from SCell to Pcell | ETRI | imported from 3GU |
R1‑2101089 | Discussion on multi-cell PDSCH scheduling via a single DCI | ETRI | imported from 3GU |
R1‑2101090 | [Draft] Reply LS on SL switching priority | Xiaomi | imported from 3GU |
R1‑2101091 | Correction on UE procedure for reporting HARQ-ACK | Xiaomi | imported from 3GU |
R1‑2101092 | Enhancements on multi-beam operation | Xiaomi | imported from 3GU |
R1‑2101093 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | Xiaomi | imported from 3GU |
R1‑2101094 | Enhancement on Inter-cell Multi-TRP operations | Xiaomi | imported from 3GU |
R1‑2101095 | Enhancement on beam management for Multi-TRP | Xiaomi | imported from 3GU |
R1‑2101096 | Discussion on SRS enhancements | Xiaomi | imported from 3GU |
R1‑2101097 | Discussion on sidelink resource allocation for power saving | Xiaomi | imported from 3GU |
R1‑2101098 | Feasibility and benefits for mode2 enhancements | Xiaomi | imported from 3GU |
R1‑2101099 | Discussion on remaining issues of sidelink evaluation methodology | Xiaomi | imported from 3GU |
R1‑2101100 | Discussion on Cross-carrier scheduling from SCell to PCell | Xiaomi | imported from 3GU |
R1‑2101101 | Discussion on Traffic model for XR evaluation | Xiaomi | imported from 3GU |
R1‑2101102 | Discussion on evaluation methodology for XR services | Xiaomi | imported from 3GU |
R1‑2101103 | Discussion on potential enhancement for supporting XR | Xiaomi | imported from 3GU |
R1‑2101104 | Discussion on the scenarios of NBIoT and eMTC over NTN | Xiaomi | imported from 3GU |
R1‑2101105 | Discussion on time and frequency synchronization for IoT NTN | Xiaomi | imported from 3GU |
R1‑2101106 | Discussion on the timing relationship enhancement for IoT NTN | Xiaomi | imported from 3GU |
R1‑2101107 | Discussion on the HARQ enhancement for IoT NTN | Xiaomi | imported from 3GU |
R1‑2101108 | Discussion on the other design aspects for IoT NTN | Xiaomi | imported from 3GU |
R1‑2101109 | On initial access aspects for NR from 52.6GHz to 71GHz | Xiaomi | imported from 3GU |
R1‑2101110 | PDCCH monitoring enhancement for NR 52.6-71GHz | Xiaomi | imported from 3GU |
R1‑2101111 | Discussion on beam management in NR from 52.6 GHz to 71GHz | Xiaomi | imported from 3GU |
R1‑2101112 | PDSCH and PUSCH enhancements for NR 52.6-71GHz | Xiaomi | imported from 3GU |
R1‑2101113 | Channel access mechanism for NR on 52.6-71 GHz | Xiaomi | imported from 3GU |
R1‑2101114 | UE feedback enhancement for HARQ-ACK | Xiaomi | imported from 3GU |
R1‑2101115 | Enhancement for unlicensed band URLLC/IIoT | Xiaomi | imported from 3GU |
R1‑2101116 | Intra-UE multiplexing prioritization for URLLC/IIoT | Xiaomi | imported from 3GU |
R1‑2101117 | Discussion on the timing relationship enhancement for NTN | Xiaomi | imported from 3GU |
R1‑2101118 | Discussion on UL time and frequency synchronization for NTN | Xiaomi | imported from 3GU |
R1‑2101119 | Discussion on the HARQ enhancement for NTN | Xiaomi | imported from 3GU |
R1‑2101120 | Discussion on other design aspects for NTN | Xiaomi | imported from 3GU |
R1‑2101121 | Accuracy improvements for DL-AoD positioning solutions | Xiaomi | imported from 3GU |
R1‑2101122 | Discussion on the complexity reduction for Redcap | Xiaomi | imported from 3GU |
R1‑2101123 | Discussion on the higher layer support for Redcap | Xiaomi | imported from 3GU |
R1‑2101124 | Discussion on the coverage recovery for Redcap | Xiaomi | imported from 3GU |
R1‑2101125 | Paging enhancement for power saving | Xiaomi | imported from 3GU |
R1‑2101126 | On TRS/CSI-RS occasion(s) for idle/inactive UEs | Xiaomi | imported from 3GU |
R1‑2101127 | Enhancements on PUSCH repetiton type A | Xiaomi | imported from 3GU |
R1‑2101128 | Joint channel estimation for PUSCH | Xiaomi | imported from 3GU |
R1‑2101129 | PUCCH enhancement | Xiaomi | imported from 3GU |
R1‑2101130 | Type A PUSCH repetitions for Msg3 | Xiaomi | imported from 3GU |
R1‑2101131 | On methods for Rx/Tx timing delays mitigation | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101132 | UL-AoA positioning enhancements | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101133 | DL-AoD positioning enhancements | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101134 | 38.213 CR on DCI ordering in a search space set | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101135 | Draft 38.212 CR on NNZC indicator field for type-II CSI reporting | MediaTek Inc. | imported from 3GU |
R1‑2101136 | Draft 38.214 CR on CSI request constraint per slot | MediaTek Inc. | imported from 3GU |
R1‑2101137 | Traffic Model for XR and CG | MediaTek Inc. | imported from 3GU |
R1‑2101138 | Skeleton TR 36.763 Study on NB-IoT / eMTC for NTN (Release 17) | MediaTek Inc. | imported from 3GU |
R1‑2101139 | Text Proposal for TR 36.673 chapter related to RAN1 | MediaTek Inc. | imported from 3GU |
R1‑2101140 | The mitigation of RX/TX timing delays for higher accuracy | MediaTek Inc. | imported from 3GU |
R1‑2101141 | Accuracy enhancement for DL-AOD technique | MediaTek Inc. | imported from 3GU |
R1‑2101142 | Solving the synchronization error by the combination of measurements for DL-TDOA and UL-TDOA | MediaTek Inc. | imported from 3GU |
R1‑2101143 | Enhancement on HST-SFN deployment | Ericsson | imported from 3GU |
R1‑2101144 | Enhancement on Multi-TRP inter-cell operation | Ericsson | imported from 3GU |
R1‑2101145 | Discussion on CG collision with UCI and DG | Ericsson | imported from 3GU |
R1‑2101146 | IoT NTN Link Budget | Eutelsat S.A. | imported from 3GU |
R1‑2101147 | Draft relay LS on TCI state indication at Direct SCell activation | vivo | imported from 3GU |
R1‑2101148 | Draft relay LS on SL switching priority | vivo | imported from 3GU |
R1‑2101149 | Discussion on switching between LTE SL and NR SL | vivo | imported from 3GU |
R1‑2101150 | Draft relay LS on per-table MCS range for mode-2 | vivo | imported from 3GU |
R1‑2101151 | Draft relay LS on SL DRX design | vivo | imported from 3GU |
R1‑2101152 | Discussion on Paging enhancement | vivo | imported from 3GU |
R1‑2101153 | Draft reply LS on Rel-16 NR Positioning Correction | vivo | imported from 3GU |
R1‑2101154 | Reply LS on overlapped data and SR with equal L1 priority | vivo | imported from 3GU |
R1‑2101155 | Draft reply LS on on inter-donor topology redundancy | vivo | imported from 3GU |
R1‑2101156 | Draft reply LS on measuring CSI-RS during SCell activation | vivo | imported from 3GU |
R1‑2101157 | Draft reply LS on New Standardized 5QIs for 5G-AIS | vivo | imported from 3GU |
R1‑2101158 | Discussion on Configuration for CA Half duplex operation | vivo | imported from 3GU |
R1‑2101159 | Discussion on RAN1 impacts for small data transmisison | vivo | imported from 3GU |
R1‑2101160 | Discussion on Rel-15 beamswitchtiming capability reporting and QCL assumption for aperiodic TRS | vivo | imported from 3GU |
R1‑2101161 | Correction on QCL assumption for aperiodic TRS | vivo | imported from 3GU |
R1‑2101162 | Draft CR on correction of RRC parameter name | vivo | imported from 3GU |
R1‑2101163 | Draft reply LS on half-duplex operation | Samsung | imported from 3GU |
R1‑2101164 | Discussion on measuring CSI-RS during Scell activation | Samsung | imported from 3GU |
R1‑2101165 | Discussion on physical layer aspects of small data transmission | Samsung | imported from 3GU |
R1‑2101166 | Draft reply LS on overlapped data and SR are of equal L1 priority | Samsung | imported from 3GU |
R1‑2101167 | Draft reply LS on inter-donor topology redundancy | Samsung | imported from 3GU |
R1‑2101168 | Draft reply LS on per-table MCS range for mode-2 | Samsung | imported from 3GU |
R1‑2101169 | Draft reply LS on SL switching priority | Samsung | imported from 3GU |
R1‑2101170 | Draft reply LS on the use of simultaneous CSI-RS resources and ports | Samsung | imported from 3GU |
R1‑2101171 | Draft CR on configured grant based PUSCH | Samsung | imported from 3GU |
R1‑2101172 | Correction on the condition to use Type 1 DL channel access | Samsung | imported from 3GU |
R1‑2101173 | Correction on the use of subCarrierSpacingCommon in NR-U | Samsung | imported from 3GU |
R1‑2101174 | Maintenance for NR Sidelink Physical Layer Structure | Samsung | imported from 3GU |
R1‑2101175 | Draft CR on Sidelink Physical Duration to Logical Slot Conversion | Samsung | imported from 3GU |
R1‑2101176 | Maintenance for NR Sidelink Mode 2 Operation | Samsung | imported from 3GU |
R1‑2101177 | Maintanence on PDCCH as PDSCH SLIV reference | Samsung | imported from 3GU |
R1‑2101178 | Maintanence on SPS PDSCH | Samsung | imported from 3GU |
R1‑2101179 | Draft CR on SPS release for PDSCH with aggregation | Samsung | imported from 3GU |
R1‑2101180 | On maintenance of Rel.16 multi-beam operation | Samsung | imported from 3GU |
R1‑2101181 | Summary for Rel.16 NR eMIMO maintenance | Moderator (Samsung) | imported from 3GU |
R1‑2101182 | On Rel.16 multi-TRP/panel transmission | Samsung | imported from 3GU |
R1‑2101183 | On UL full power transmission | Samsung | imported from 3GU |
R1‑2101184 | On NR Rel.16 UE features | Samsung | imported from 3GU |
R1‑2101185 | Moderator summary for multi-beam enhancement | Moderator (Samsung) | imported from 3GU |
R1‑2101186 | Multi-Beam Enhancements | Samsung | imported from 3GU |
R1‑2101187 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | Samsung | imported from 3GU |
R1‑2101188 | Enhancements on Multi-TRP inter-cell operation | Samsung | imported from 3GU |
R1‑2101189 | Enhancements on beam management for multi-TRP | Samsung | imported from 3GU |
R1‑2101190 | Enhancements on HST-SFN | Samsung | imported from 3GU |
R1‑2101191 | Enhancements on SRS | Samsung | imported from 3GU |
R1‑2101192 | Views on Rel. 17 CSI enhancements | Samsung | imported from 3GU |
R1‑2101193 | Additional enhancements for multi-beam | Samsung | imported from 3GU |
R1‑2101194 | Initial access aspects for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101195 | PDCCH monitoring enhancements for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101196 | Enhancements for PUCCH format 0/1/4 for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101197 | Beam management for new SCSs for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101198 | PDSCH/PUSCH enhancements for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101199 | Channel access mechanism for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101200 | Discussion on the synchronization raster for NR from 52.6 GHz to 71 GHz | Samsung | imported from 3GU |
R1‑2101201 | On HARQ-ACK reporting enhancements | Samsung | imported from 3GU |
R1‑2101202 | Improving MCS Selection for URLLC | Samsung | imported from 3GU |
R1‑2101203 | Enhancements for unlicensed band URLLC/IIoT | Samsung | imported from 3GU |
R1‑2101204 | Uplink intra-UE multiplexing and prioritization | Samsung | imported from 3GU |
R1‑2101205 | Discussion for propagation delay compensation enhancements | Samsung | imported from 3GU |
R1‑2101206 | Timing relationship enhancements for NTN | Samsung | imported from 3GU |
R1‑2101207 | Enhancements on UL time and frequency synchronization for NTN | Samsung | imported from 3GU |
R1‑2101208 | Enhancements on HARQ for NTN | Samsung | imported from 3GU |
R1‑2101209 | Remaining issues for NTN | Samsung | imported from 3GU |
R1‑2101210 | Discussion on accuracy improvements on timing based positioning solutions | Samsung | imported from 3GU |
R1‑2101211 | Discussion on accuracy improvements for UL-AoA positioning solutions | Samsung | imported from 3GU |
R1‑2101212 | Accuracy improvements for DL-AoD positioning solutions | Samsung | imported from 3GU |
R1‑2101213 | Discussion on differential beamforming for positioning enhancement | Samsung | imported from 3GU |
R1‑2101214 | UE complexity reduction | Samsung | imported from 3GU |
R1‑2101215 | UE capability report and access barring for Redcap UE | Samsung | imported from 3GU |
R1‑2101216 | Remaining issues for Redcap | Samsung | imported from 3GU |
R1‑2101217 | Discussion on paging enhancements | Samsung | imported from 3GU |
R1‑2101218 | Moderator summary for TRS/CSI-RS occasion(s) for idle/inactive UEs | Moderator (Samsung) | imported from 3GU |
R1‑2101219 | Discussion on TRS/CSI-RS occasion(s) for idle/inactive UEs | Samsung | imported from 3GU |
R1‑2101220 | Discussion on DCI-based power saving techniques | Samsung | imported from 3GU |
R1‑2101221 | Enhancements on PUSCH repetition type A | Samsung | imported from 3GU |
R1‑2101222 | TB processing over multi-slot PUSCH | Samsung | imported from 3GU |
R1‑2101223 | Joint channel estimation for PUSCH | Samsung | imported from 3GU |
R1‑2101224 | PUCCH enhancements | Samsung | imported from 3GU |
R1‑2101225 | Type A PUSCH repetitions for Msg3 | Samsung | imported from 3GU |
R1‑2101226 | Discussion on PRACH enhancements for msg3 improvement | Samsung | imported from 3GU |
R1‑2101227 | Enhancements to Resource Multiplexing for NR IAB | Samsung | imported from 3GU |
R1‑2101228 | Enhancements to Timing, Power Control and CLI for NR IAB | Samsung | imported from 3GU |
R1‑2101229 | On Sidelink Enhacement Work Item | Samsung | imported from 3GU |
R1‑2101230 | On Resource Allocation Enhacements | Samsung | imported from 3GU |
R1‑2101231 | On Resource Allocation for Power Saving | Samsung | imported from 3GU |
R1‑2101232 | On Feasibility and Benefits for Mode2 Enhancements | Samsung | imported from 3GU |
R1‑2101233 | On Sidelink Issues and RAN1 Impacts | Samsung | imported from 3GU |
R1‑2101234 | On mechanisms to support group scheduling for RRC_CONNECTED UEs | Samsung | imported from 3GU |
R1‑2101235 | On mechanisms to improve reliability for RRC_CONNECTED UEs | Samsung | imported from 3GU |
R1‑2101236 | On basic functions for broadcast/multicast for RRC_IDLE/RRC_INACTIVE UEs | Samsung | imported from 3GU |
R1‑2101237 | Cross-carrier scheduling from SCell to PCell | Samsung | imported from 3GU |
R1‑2101238 | Considerations for scheduling on two cells using a single DCI format | Samsung | imported from 3GU |
R1‑2101239 | On efficient activation/de-activation mechanism for Scells | Samsung | imported from 3GU |
R1‑2101240 | XR Applications and Traffic Models | Samsung | imported from 3GU |
R1‑2101241 | XR Evaluation Methodology and KPIs | Samsung | imported from 3GU |
R1‑2101242 | On Scenarios applicable to NB-IoT/eMTC | Samsung | imported from 3GU |
R1‑2101243 | On enhancements to time and frequency synchronization | Samsung | imported from 3GU |
R1‑2101244 | On timing relationship enhancements | Samsung | imported from 3GU |
R1‑2101245 | On enhancements on HARQ | Samsung | imported from 3GU |
R1‑2101246 | On remaining issues of DL 1024QAM for NR FR1 | Samsung | imported from 3GU |
R1‑2101247 | Feature lead summary for NR-U DL Signals and Channels | Moderator (Lenovo) | imported from 3GU |
R1‑2101248 | Discussions on PDCCH monitoring for reduced capability devices | CEWiT | imported from 3GU |
R1‑2101249 | Updates on NR UE Features | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101250 | Discussion on SRS carrier information | Huawei, HiSilicon | imported from 3GU |
R1‑2101251 | Reply LS on Rel-16 NR Positioning Correction | Huawei, HiSilicon | imported from 3GU |
R1‑2101252 | Considerations on other enhancements for positioning accuracy | Huawei, HiSilicon | imported from 3GU |
R1‑2101253 | Views on handling potential overlaps with other WIs | Huawei, HiSilicon | imported from 3GU |
R1‑2101254 | Physical layer impacts of sidelink DRX | Huawei, HiSilicon | imported from 3GU |
R1‑2101255 | Initial evaluation results for XR and Cloud Gaming | Huawei, HiSilicon | imported from 3GU |
R1‑2101256 | Remaining issues for multi-TRP in Rel-16 | Huawei, HiSilicon | imported from 3GU |
R1‑2101257 | Other considerations on power saving in Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2101258 | Remaining issues for Rel-16 UE power saving | Huawei, HiSilicon | imported from 3GU |
R1‑2101259 | Discussion on inter-band DC for Rel-16 IAB | Huawei, HiSilicon | imported from 3GU |
R1‑2101260 | Discussion on other design aspects for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2101261 | Other aspects to support IoT in NTN | Huawei, HiSilicon | imported from 3GU |
R1‑2101262 | Corrections on PDCCH enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑2101263 | Remaining issues on UCI enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑2101264 | PHY prioritization/multiplexing with consideration of UL skipping | Huawei, HiSilicon | imported from 3GU |
R1‑2101265 | Enhancements for support of time synchronization | Huawei, HiSilicon | imported from 3GU |
R1‑2101266 | Potential solutions for UL coverage recovery | Huawei, HiSilicon | imported from 3GU |
R1‑2101267 | RA and CG based small data transmission | Huawei, HiSilicon | imported from 3GU |
R1‑2101268 | Link level and system evaluation results for 52-71 GHz | Huawei, HiSilicon | imported from 3GU |
R1‑2101269 | Other aspects for XR and Cloud Gaming | Huawei, HiSilicon | imported from 3GU |
R1‑2101270 | Discussions on enhancements for UL Tx switching | Huawei, HiSilicon | imported from 3GU |
R1‑2101271 | Corrections on Type II CSI reporting in Rel-16 | Huawei, HiSilicon | imported from 3GU |
R1‑2101272 | Corrections on Scell BFR in Rel-16 | Huawei, HiSilicon | imported from 3GU |
R1‑2101273 | Remaining details of Rel-16 NR UE features | Huawei, HiSilicon | imported from 3GU |
R1‑2101274 | Further details on CSI Enhancements for Rel-17 | Huawei, HiSilicon | imported from 3GU |
R1‑2101275 | Correction on the search space configuration of PUCCH-SCell | Huawei, HiSilicon | imported from 3GU |
R1‑2101276 | Reply LS on overlapped data and SR with equal L1 priority for Rel-16 URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑2101277 | Discussion on overlapped data and SR with equal L1 priority for Rel-16 URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑2101278 | Channel quality reporting in NB-IoT to support 16QAM | Huawei, HiSilicon | imported from 3GU |
R1‑2101279 | Corrections on multi-TB scheduling for eMTC | Huawei, HiSilicon | imported from 3GU |
R1‑2101280 | Work plan of Rel-17 enhancements for NB-IoT and LTE-MTC | Huawei, Ericsson | imported from 3GU |
R1‑2101281 | Correction on spectral efficiency of 1024QAM | Huawei, HiSilicon | imported from 3GU |
R1‑2101282 | Correction on transmission scheme for NPDSCH configured by PUR-RNTI | Huawei, HiSilicon | imported from 3GU |
R1‑2101283 | Feature Lead Summary on Channel Access Procedures for NR-U | Moderator (Nokia) | imported from 3GU |
R1‑2101284 | Corrections on Channel Access Procedures for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101285 | DCI-based Power Saving Enhancements | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R1‑2101286 | Discussion on Initial access aspects for NR beyond 52.6 GHz | CEWiT | imported from 3GU |
R1‑2101287 | Discussion on RAN4 LS on measuring CSI-RS during SCell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101288 | Beam management and BWP operation in NTN | THALES | imported from 3GU |
R1‑2101289 | Discussion on HARQ for NTN | THALES | imported from 3GU |
R1‑2101290 | HARQ-ACK enhancements for IIoT and URLLC | InterDigital, Inc. | imported from 3GU |
R1‑2101291 | Enhancements for unlicensed band URLLC/IIoT | InterDigital, Inc. | imported from 3GU |
R1‑2101292 | USS monitoring in sSCell and PCell | InterDigital, Inc. | imported from 3GU |
R1‑2101293 | On the support of single DCI scheduling multi-cell | InterDigital, Inc. | imported from 3GU |
R1‑2101294 | Fast SCell Activation | InterDigital, Inc. | imported from 3GU |
R1‑2101295 | SSB, beam management and polarization signaling for NTN | PANASONIC | imported from 3GU |
R1‑2101296 | Further views on DL-UL timing relationship for NTN operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101297 | Time and frequency synchronization for NTN systems | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101298 | On HARQ operation for NTN systems | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101299 | Additional aspects for NR over NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101300 | On paging enhancement | Panasonic | imported from 3GU |
R1‑2101301 | Potential enhancements for TRS/CSI-RS occasion(s) for idle/inactive UEs | Panasonic | imported from 3GU |
R1‑2101302 | Potential extension(s) to Rel-16 DCI-based power saving adaptation during DRX ActiveTime | Panasonic | imported from 3GU |
R1‑2101303 | Draft Reply LS on the use of simultaneous CSI-RS resources and ports | Ericsson | imported from 3GU |
R1‑2101304 | Corrections related to channel access | Ericsson | imported from 3GU |
R1‑2101305 | Corrections related to DL & UL and Discussion on RAN4 LS | Ericsson | imported from 3GU |
R1‑2101306 | Initial Access Aspects | Ericsson | imported from 3GU |
R1‑2101307 | PDCCH Monitoring Enhancements | Ericsson | imported from 3GU |
R1‑2101308 | PUCCH enhancements | Ericsson | imported from 3GU |
R1‑2101309 | Beam Management for New SCSs | Ericsson | imported from 3GU |
R1‑2101310 | PDSCH-PUSCH Enhancements | Ericsson | imported from 3GU |
R1‑2101311 | Channel Access Mechanisms | Ericsson | imported from 3GU |
R1‑2101312 | Others | Ericsson | imported from 3GU |
R1‑2101313 | Enhancements on Multi-beam Operation | Ericsson | imported from 3GU |
R1‑2101314 | Traffic model for XR | Ericsson | imported from 3GU |
R1‑2101315 | Evaluation methodology for XR | Ericsson | imported from 3GU |
R1‑2101316 | Initial XR performance evaluation results | Ericsson | imported from 3GU |
R1‑2101317 | Mobility and XR applications | Ericsson | imported from 3GU |
R1‑2101318 | Additional simulation results on multi-beam operation | Ericsson | imported from 3GU |
R1‑2101319 | Draft LS response on New Standardized 5QIs for AIS | Ericsson | imported from 3GU |
R1‑2101320 | Enhancements on Reference Signals for PDSCH/PUSCH for NR beyond 52.6 GHz | CEWiT | imported from 3GU |
R1‑2101321 | Discussion on PDCCH monitoring enhancements for NR above 52.6GHz | CEWiT | imported from 3GU |
R1‑2101322 | Design consideration for Higher layer support of RedCap | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101323 | NTN IoT HARQ Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101324 | Design considerations to support 16-QAM for NB-IOT | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101325 | Design considerations to support 14-HARQ Feature for LTE-M | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101326 | Design considerations to support DL TBS of 1736 bits for LTE-M | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101327 | Design Considerations for Enhancements on PUSCH repetition | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101328 | Design Considerations for TB processing over multi-slot PUSCH | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101329 | Design Considerations for Joint channel estimation for PUSCH | Sierra Wireless, S.A. | imported from 3GU |
R1‑2101330 | PDSCH-PUSCH Enhancement Aspects for NR beyond 52.6 GHz | Charter Communications | imported from 3GU |
R1‑2101331 | Channel access mechanisms | Charter Communications | imported from 3GU |
R1‑2101332 | Feature lead summary for enhancements to initial access procedures | Moderator (Charter Communications) | imported from 3GU |
R1‑2101333 | Unlicensed spectrum operation for URLLC/IIoT | Charter Communications | imported from 3GU |
R1‑2101334 | UE identification for redcap devices | Sony | imported from 3GU |
R1‑2101335 | Discussion on measuring CSI-RS during SCell activation | Apple | imported from 3GU |
R1‑2101336 | [Draft] LS reply on measuring CSI-RS during SCell activation | Apple | imported from 3GU |
R1‑2101337 | Draft reply LS on newly proposed 5QIs for 5G-AIS | Apple | imported from 3GU |
R1‑2101338 | Discussion on physical layer aspects of small data transmission | Apple | imported from 3GU |
R1‑2101339 | Clarification of FG3-5b with Cross Carrier Operation | Apple | imported from 3GU |
R1‑2101340 | Clarification on the PUSCH scheduling constraint in Rel-15 | Apple | imported from 3GU |
R1‑2101341 | Discussions on PUSCH skipping | Apple | imported from 3GU |
R1‑2101342 | Discussions on NR Rel-16 UE features | Apple | imported from 3GU |
R1‑2101343 | Discussion on Rel-16 UE features for mobility enhancement | Apple | imported from 3GU |
R1‑2101344 | Remaining Issues of Sidelink Physical Layer Procedures | Apple | imported from 3GU |
R1‑2101345 | Remaining Issue of Mode 1 Resource Allocation | Apple | imported from 3GU |
R1‑2101346 | Remaining Issues of Mode 2 Resource Allocation | Apple | imported from 3GU |
R1‑2101347 | Remaining issues on UCI and PUSCH enhancements for eURLLC | Apple | imported from 3GU |
R1‑2101348 | PUSCH skipping considering physical layer priority & LCH based prioritization | Apple | imported from 3GU |
R1‑2101349 | Remaining issues on Rel-16 Multi-TRP enhancement | Apple | imported from 3GU |
R1‑2101350 | Views on Rel-17 Beam Management enhancement | Apple | imported from 3GU |
R1‑2101351 | Views on Rel-17 multi-TRP reliability enhancement | Apple | imported from 3GU |
R1‑2101352 | Views on Rel-17 Inter-cell multi-TRP operation | Apple | imported from 3GU |
R1‑2101353 | Views on Rel-17 multi-TRP BM enhancement | Apple | imported from 3GU |
R1‑2101354 | Views on Rel-17 HST enhancement | Apple | imported from 3GU |
R1‑2101355 | Views on Rel-17 SRS enhancement | Apple | imported from 3GU |
R1‑2101356 | Views on Rel-17 CSI enhancement | Apple | imported from 3GU |
R1‑2101357 | Sidelink Resource Allocation for Power Saving | Apple | imported from 3GU |
R1‑2101358 | Inter-UE Coordination for Mode 2 Resource Allocation | Apple | imported from 3GU |
R1‑2101359 | Discussion on group scheduling mechanism for RRC_connected UEs | Apple | imported from 3GU |
R1‑2101360 | Discussion on MBS reliability improvement for RRC_connected UEs | Apple | imported from 3GU |
R1‑2101361 | Discussion on MBS for RRC_IDLE/RRC_INACTIVE UEs | Apple | imported from 3GU |
R1‑2101362 | Views on Rel-17 DSS SCell scheduling PCell | Apple | imported from 3GU |
R1‑2101363 | Views on Rel-17 DSS Multi-cell PDSCH scheduling via a single DCI | Apple | imported from 3GU |
R1‑2101364 | On Efficiency Activation/De-activation for SCells in CA | Apple | imported from 3GU |
R1‑2101365 | Views on XR traffic models | Apple | imported from 3GU |
R1‑2101366 | Views on XR evaluation methodology | Apple | imported from 3GU |
R1‑2101367 | Views on potential enhancements for XR | Apple | imported from 3GU |
R1‑2101368 | On Link Budget of IoT NTN | Apple | imported from 3GU |
R1‑2101369 | Discussion on Time and Frequency Synchronization in IoT NTN | Apple | imported from 3GU |
R1‑2101370 | Discussion on Timing Relationship Enhancement in IoT NTN | Apple | imported from 3GU |
R1‑2101371 | Discussion on HARQ Enhancement in IoT NTN | Apple | imported from 3GU |
R1‑2101372 | On Initial access signals and channels | Apple | imported from 3GU |
R1‑2101373 | PDCCH monitoring enhancements for NR between 52.6GHz and 71 GHz | Apple | imported from 3GU |
R1‑2101374 | Enhancements for PUCCH formats 0/1/4 for NR between 52.6GHz and 71 GHz | Apple | imported from 3GU |
R1‑2101375 | On beam management for new SCSs | Apple | imported from 3GU |
R1‑2101376 | PDSCH/PUSCH enhancements for NR between 52.6GHz and 71 GHz | Apple | imported from 3GU |
R1‑2101377 | Channel access mechanisms for unlicensed access above 52.6GHz | Apple | imported from 3GU |
R1‑2101378 | Views on UE feedback enhancements for HARQ-ACK | Apple | imported from 3GU |
R1‑2101379 | Views on CSI feedback enhancements | Apple | imported from 3GU |
R1‑2101380 | URLLC uplink enhancements for unlicensed spectrum | Apple | imported from 3GU |
R1‑2101381 | Views on Intra-UE Multiplexing/Prioritization | Apple | imported from 3GU |
R1‑2101382 | Orphan symbol treatment in unlicensed spectrum access | Apple | imported from 3GU |
R1‑2101383 | Enhancement on Timing Relationship in NTN | Apple | imported from 3GU |
R1‑2101384 | Discussion on Uplink Time and Frequency Synchronization for NTN | Apple | imported from 3GU |
R1‑2101385 | Discussion on HARQ Enhancements for NTN | Apple | imported from 3GU |
R1‑2101386 | Other Aspects of NR NTN | Apple | imported from 3GU |
R1‑2101387 | Positioning accuracy enhancements under UE and/or gNB Tx/Rx timing errors | Apple | imported from 3GU |
R1‑2101388 | Accuracy enhancements for DL-AoD positioning technique | Apple | imported from 3GU |
R1‑2101389 | Accuracy enhancements for UL-AoA positioning technique | Apple | imported from 3GU |
R1‑2101390 | On UE complexity reduction features for RedCap | Apple | imported from 3GU |
R1‑2101391 | On Higher Layer Support of Redcap Devices | Apple | imported from 3GU |
R1‑2101392 | Paging early indication for idle/inactive-mode UE | Apple | imported from 3GU |
R1‑2101393 | Indication of TRS/CSI-RS for idle/inactive-mode UE power saving | Apple | imported from 3GU |
R1‑2101394 | Enhanced DCI-based power saving adaptation | Apple | imported from 3GU |
R1‑2101395 | Discussion on PUSCH repetition type A enhancement | Apple | imported from 3GU |
R1‑2101396 | Discussion on TB processing over multi-slot PUSCH | Apple | imported from 3GU |
R1‑2101397 | Discussion on joint channel estimation for PUSCH | Apple | imported from 3GU |
R1‑2101398 | PUCCH coverage enhancement | Apple | imported from 3GU |
R1‑2101399 | Discussion on msg3 PUSCH repetition | Apple | imported from 3GU |
R1‑2101400 | Discussion on Reduce Power Consumption for Sidelink | ROBERT BOSCH GmbH | imported from 3GU |
R1‑2101401 | Discussion on Sidelink Mode-2 Resource Allocation Enhancements | ROBERT BOSCH GmbH | imported from 3GU |
R1‑2101402 | Time/Frequency Synchronization for IoT NTN | InterDigital, Inc. | imported from 3GU |
R1‑2101403 | On timing relationship enhancement for IoT NTN | InterDigital, Inc. | imported from 3GU |
R1‑2101404 | HARQ enhancement for IoT NTN | InterDigital, Inc. | imported from 3GU |
R1‑2101405 | Physical layer aspects of small data transmission | InterDigital, Inc. | imported from 3GU |
R1‑2101406 | On TB processing over multiple slots for PUSCH | Indian Institute of Tech (H) | imported from 3GU |
R1‑2101407 | PUSCH Repetitions for Coverage Enhancement | Indian Institute of Tech (H) | imported from 3GU |
R1‑2101408 | FL summary on the maintenance of 2-step RACH | Moderator (ZTE) | imported from 3GU |
R1‑2101409 | Inter-UE coordination for mode 2 enhancement | ITL | imported from 3GU |
R1‑2101410 | Discussion on new standardized 5QIs for 5G-AIS from SA2 | OPPO, Tencent, China Mobile, China Telecom, China Unicom | imported from 3GU |
R1‑2101411 | [Draft] Reply LS on New Standardized 5QIs for 5G-AIS (Advanced Interactive Services) | OPPO | imported from 3GU |
R1‑2101412 | FL summary for AI 8.11.1.1 – resource allocation for power saving | Moderator (OPPO) | imported from 3GU |
R1‑2101413 | Discussion on scenarios for NB-IoT and eMTC over NTN | CAICT | imported from 3GU |
R1‑2101414 | Multi-beam Enhancements | Convida Wireless | imported from 3GU |
R1‑2101415 | Multi-TRP Enhancements for PDCCH, PUCCH and PUSCH | Convida Wireless | imported from 3GU |
R1‑2101416 | On Per-TRP Beam Failure Recovery | Convida Wireless | imported from 3GU |
R1‑2101417 | Consideration for NR Initial Access from 52.6 GHz to 71 GHz | Convida Wireless | imported from 3GU |
R1‑2101418 | Consideration for PDCCH Monitoring for Supporting NR from 52.6 GHz to 71 GHz | Convida Wireless | imported from 3GU |
R1‑2101419 | On Beam Management for Supporting NR from 52.6 GHz to 71 GHz | Convida Wireless | imported from 3GU |
R1‑2101420 | On Channel Access Mechanism for Extending Current NR to 71 GHz | Convida Wireless | imported from 3GU |
R1‑2101421 | Support for NR DL 1024 QAM in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101422 | On NR Sidelink Resource Allocation for Power Saving | Convida Wireless | imported from 3GU |
R1‑2101423 | On NR Sidelink Resource Allocation Mode 2 Enhancement | Convida Wireless | imported from 3GU |
R1‑2101424 | On group scheduling mechanism for NR multicast and broadcast | Convida Wireless | imported from 3GU |
R1‑2101425 | On reliability enhancement for NR multicast and broadcast | Convida Wireless | imported from 3GU |
R1‑2101426 | On NR multicast and broadcast for RRC_IDLE/RRC_INACTIVE UEs | Convida Wireless | imported from 3GU |
R1‑2101427 | Reply to RAN4 LS on SL Switching Priority | Qualcomm Incorporated | imported from 3GU |
R1‑2101428 | Reply to RAN2 LS on per-table MCS range for mode-2 | Qualcomm Incorporated | imported from 3GU |
R1‑2101429 | Reply to RAN2 LS on SL DRX design | Qualcomm Incorporated | imported from 3GU |
R1‑2101430 | Reply to RAN2 LS on SDT resource configuration | Qualcomm Incorporated | imported from 3GU |
R1‑2101431 | Discussion on CSI-RS ambiguities | Qualcomm Incorporated | imported from 3GU |
R1‑2101432 | Discussion on SRS carrier switching | Qualcomm Incorporated | imported from 3GU |
R1‑2101433 | Clarification on UE Features with Cross-Carrier Operation | Qualcomm Incorporated | imported from 3GU |
R1‑2101434 | Clarification on Cancellation due to SFI, PDSCH, or CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑2101435 | Invalid SSB in FBE | Qualcomm Incorporated | imported from 3GU |
R1‑2101436 | Remaining Issues in Mode 1 Resource Allocation | Qualcomm Incorporated | imported from 3GU |
R1‑2101437 | Remaining Issues in Mode 2 Resource Allocation | Qualcomm Incorporated | imported from 3GU |
R1‑2101438 | Remaining Issues in Physical Layer Procedure | Qualcomm Incorporated | imported from 3GU |
R1‑2101439 | Remaining issue on HARQ and scheduling for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑2101440 | Remaining issues on eCG enhancements for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑2101441 | Remaining Issues on Multi-TRP Enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑2101442 | Remaining issue on NR-DC power-control | Qualcomm Incorporated | imported from 3GU |
R1‑2101443 | Remaining issues on SCell dormancy and cross-carrier scheduling | Qualcomm Incorporated | imported from 3GU |
R1‑2101444 | Discussion on NR Rel-16 UE features | Qualcomm Incorporated | imported from 3GU |
R1‑2101445 | Remaining issues for 1Tx-2Tx switching | Qualcomm Incorporated | imported from 3GU |
R1‑2101446 | Enhancements on Multi-beam Operation | Qualcomm Incorporated | imported from 3GU |
R1‑2101447 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101448 | Enhancements on Multi-TRP inter-cell operation | Qualcomm Incorporated | imported from 3GU |
R1‑2101449 | Enhancements on beam management for multi-TRP | Qualcomm Incorporated | imported from 3GU |
R1‑2101450 | Enhancements on HST-SFN deployment | Qualcomm Incorporated | imported from 3GU |
R1‑2101451 | Enhancements on SRS flexibility, coverage and capacity | Qualcomm Incorporated | imported from 3GU |
R1‑2101452 | CSI enhancements: MTRP and FR1 FDD reciprocity | Qualcomm Incorporated | imported from 3GU |
R1‑2101453 | Initial access aspects for NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101454 | PDCCH monitoring enhancements for NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101455 | Enhancements for PUCCH for NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101456 | Beam management for new SCS for NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101457 | PDSCH/PUSCH enhancements for NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101458 | Channel access mechanism for NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101459 | HARQ-ACK enhancement for IOT and URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑2101460 | CSI enhancement for IOT and URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑2101461 | Uplink enhancements for URLLC in unlicensed controlled environments | Qualcomm Incorporated | imported from 3GU |
R1‑2101462 | Intra-UE multiplexing and prioritization for IOT and URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑2101463 | Enhancements for support of time synchronization for enhanced IIoT and URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑2101464 | Enhancements on Timing Relationship for NTN | Qualcomm Incorporated | imported from 3GU |
R1‑2101465 | UL time and frequency synchronization for NTN | Qualcomm Incorporated | imported from 3GU |
R1‑2101466 | Enhancements on HARQ for NTN | Qualcomm Incorporated | imported from 3GU |
R1‑2101467 | BWP operation and other issues for NTN | Qualcomm Incorporated | imported from 3GU |
R1‑2101468 | Enhancements on Timing Error Mitigations for improved Accuracy | Qualcomm Incorporated | imported from 3GU |
R1‑2101469 | Potential Enhancements on UL-AOA positioning | Qualcomm Incorporated | imported from 3GU |
R1‑2101470 | Potential Enhancements on DL-AoD positioning | Qualcomm Incorporated | imported from 3GU |
R1‑2101471 | Complexity Reduction for RedCap Devices | Qualcomm Incorporated | imported from 3GU |
R1‑2101472 | Higher layer support for RedCap devices | Qualcomm Incorporated | imported from 3GU |
R1‑2101473 | Design principles for RedCap devices | Qualcomm Incorporated | imported from 3GU |
R1‑2101474 | Paging enhancements for idle/inactive UE power saving | Qualcomm Incorporated | imported from 3GU |
R1‑2101475 | TRS/CSI-RS for idle/inactive UE power saving | Qualcomm Incorporated | imported from 3GU |
R1‑2101476 | DCI-based power saving adaptation during DRX ActiveTime | Qualcomm Incorporated | imported from 3GU |
R1‑2101477 | Enhancements on PUSCH repetition type A | Qualcomm Incorporated | imported from 3GU |
R1‑2101478 | TB processing over multi-slot PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101479 | Joint channel estimation for PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101480 | PUCCH coverage enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑2101481 | Type A PUSCH repetition for Msg3 | Qualcomm Incorporated | imported from 3GU |
R1‑2101482 | Workplan for Rel-17 IAB | Qualcomm Incorporated | imported from 3GU |
R1‑2101483 | Resource management for enhanced duplexing | Qualcomm Incorporated | imported from 3GU |
R1‑2101484 | On enhancements for simultaneous operation of IAB-node's child and parent links | Qualcomm Incorporated | imported from 3GU |
R1‑2101485 | Power Savings for Sidelink | Qualcomm Incorporated | imported from 3GU |
R1‑2101486 | Reliability and Latency Enhancements for Mode 2 | Qualcomm Incorporated | imported from 3GU |
R1‑2101487 | Views on group scheduling for Multicast RRC_CONNECTED UEs | Qualcomm Incorporated | imported from 3GU |
R1‑2101488 | Views on UE feedback for Multicast RRC_CONNECTED UEs | Qualcomm Incorporated | imported from 3GU |
R1‑2101489 | Views on group scheduling for Multicast RRC_IDLE/INACTIVE UEs | Qualcomm Incorporated | imported from 3GU |
R1‑2101490 | Cross-carrier scheduling from an SCell to the PCell/PSCell | Qualcomm Incorporated | imported from 3GU |
R1‑2101491 | Multi-cell PDSCH scheduling via a single DCI | Qualcomm Incorporated | imported from 3GU |
R1‑2101492 | Efficient activation/de-activation mechanism for SCells in NR CA | Qualcomm Incorporated | imported from 3GU |
R1‑2101493 | XR Traffic Models | Qualcomm Incorporated | imported from 3GU |
R1‑2101494 | Evaluation Methodology for XR | Qualcomm Incorporated | imported from 3GU |
R1‑2101495 | Initial XR Performance Evaluation Results | Qualcomm Incorporated | imported from 3GU |
R1‑2101496 | 1024-QAM for NR PDSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101497 | Further considerations for MIMO | Qualcomm Incorporated | imported from 3GU |
R1‑2101498 | Other aspects of NR in 52.6 to 71GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑2101499 | Other asprects of positioning enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑2101500 | Other power saving techniques | Qualcomm Incorporated | imported from 3GU |
R1‑2101501 | DL-AoD Positioning Enhancements | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101502 | Discussion of Response LS on Overlapped Data and SR of Equal L1 Priority | Ericsson Inc. | imported from 3GU |
R1‑2101503 | Paging enhancements for UE power saving | InterDigital, Inc. | imported from 3GU |
R1‑2101504 | Discussion on TRS/CSI-RS occasion(s) for idle/inactive UEs | InterDigital, Inc. | imported from 3GU |
R1‑2101505 | PDCCH monitoring reduction in Active Time | InterDigital, Inc. | imported from 3GU |
R1‑2101506 | Higher layer support for Reduced Capability NR devices | InterDigital, Inc. | imported from 3GU |
R1‑2101507 | Discussion on UE complexity reduction features | InterDigital, Inc. | imported from 3GU |
R1‑2101508 | Correction for support of 1024QAM for PDSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101509 | Support of 16-QAM for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R1‑2101510 | Support of 14 HARQ processes and scheduling delay | Qualcomm Incorporated | imported from 3GU |
R1‑2101511 | Support of larger TBS for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑2101512 | Scenarios applicable to NB-IoT/eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑2101513 | Enhancements to time and frequency synchronization | Qualcomm Incorporated | imported from 3GU |
R1‑2101514 | Timing relationship enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑2101515 | Enhancements on HARQ | Qualcomm Incorporated | imported from 3GU |
R1‑2101516 | Other aspects for NTN IOT | Qualcomm Incorporated | imported from 3GU |
R1‑2101517 | Correction on half-DuplexTDD-CA-SameSCS-r16 | CATT | imported from 3GU |
R1‑2101518 | [DRAFT] LS reply on physical layer aspects of small data transmission | Ericsson | imported from 3GU |
R1‑2101519 | SRS Performance and Potential Enhancements | Ericsson | imported from 3GU |
R1‑2101520 | PUSCH Repetition Type A Enhancement | Ericsson | imported from 3GU |
R1‑2101521 | TB Processing over Multi-Slot PUSCH | Ericsson | imported from 3GU |
R1‑2101522 | Joint Channel Estimation for PUSCH | Ericsson | imported from 3GU |
R1‑2101523 | PUCCH Dynamic Repetition and DMRS Bundling | Ericsson | imported from 3GU |
R1‑2101524 | Type A PUSCH Repetition for Msg3 | Ericsson | imported from 3GU |
R1‑2101525 | Other Coverage Enhancements for PUSCH | Ericsson | imported from 3GU |
R1‑2101526 | Draft CR to 38.213 on corrections for 2-step RACH | Ericsson | imported from 3GU |
R1‑2101527 | NR positioning enhancements by mitigating timing delays | China Telecom | imported from 3GU |
R1‑2101528 | Discussion on LS on overlapping data and SR with same L1 priority | Intel Corporation | imported from 3GU |
R1‑2101529 | Correction on MCS values for PT-RS time density determination in TS 38.214 | Sharp | imported from 3GU |
R1‑2101530 | Correction to FDRA field description | Sharp | imported from 3GU |
R1‑2101531 | Correction on FBE COT definition | Sharp | imported from 3GU |
R1‑2101532 | Remaining issues on physical layer structure and procedures for NR sidelink | Sharp | imported from 3GU |
R1‑2101533 | Remaining issues on resource allocation for NR sidelink | Sharp | imported from 3GU |
R1‑2101534 | Remaining issues on synchronization mechanism for NR sidelink | Sharp | imported from 3GU |
R1‑2101535 | Correction on inconsistence between TS 38.213 and TS 38.331 in terms of the dci-FormatsExt for NR URLLC | Sharp | imported from 3GU |
R1‑2101536 | Remaining issue on PDSCH rate matching for DCI format 1_0 for NR URLLC | Sharp | imported from 3GU |
R1‑2101537 | Enhancements on Multi-TRP PUSCH | Sharp | imported from 3GU |
R1‑2101538 | Enhancements on SRS flexibility, coverage and capacity | Sharp | imported from 3GU |
R1‑2101539 | UE feedback enhancements for HARQ-ACK | Sharp | imported from 3GU |
R1‑2101540 | Enhancements for unlicensed band URLLC/IIoT | Sharp | imported from 3GU |
R1‑2101541 | Enhancements on intra-UE UCI multiplexing and PUSCH prioritization | Sharp | imported from 3GU |
R1‑2101542 | Discussion on UE complexity reduction | Sharp | imported from 3GU |
R1‑2101543 | Discussion on other issues for reduced capability UEs | Sharp | imported from 3GU |
R1‑2101544 | On TRS/CSI-RS occasions for idle/inactive UEs | Sharp | imported from 3GU |
R1‑2101545 | Enhancements on PUSCH repetition type A | Sharp | imported from 3GU |
R1‑2101546 | TB processing over multi-slot PUSCH | Sharp | imported from 3GU |
R1‑2101547 | Joint channel estimation for PUSCH | Sharp | imported from 3GU |
R1‑2101548 | Dynamic PUCCH repetition factor indication | Sharp | imported from 3GU |
R1‑2101549 | Type A PUSCH repetitions for Msg3 | Sharp | imported from 3GU |
R1‑2101550 | Discussion on resource allocation for power saving | Sharp | imported from 3GU |
R1‑2101551 | Discussion on feasibility and benefits for mode 2 enhancements | Sharp | imported from 3GU |
R1‑2101552 | Maintenance for Rel-16 UE power savings | Ericsson | imported from 3GU |
R1‑2101553 | Maintenance for Rel-16 MR-DC and CA enhancements | Ericsson | imported from 3GU |
R1‑2101554 | Maintenance for Rel-16 UL Tx Switching | Ericsson | imported from 3GU |
R1‑2101555 | Design of Paging Enhancements | Ericsson | imported from 3GU |
R1‑2101556 | Provisioning of TRS occasions to Idle/Inactive UEs | Ericsson | imported from 3GU |
R1‑2101557 | Modeling of Network Power Consumption | Ericsson | imported from 3GU |
R1‑2101558 | Design of active time power savings mechanisms | Ericsson | imported from 3GU |
R1‑2101559 | Evaluation results for UE power saving schemes | Ericsson | imported from 3GU |
R1‑2101560 | Work plan for Rel17 WI on NR Dynamic spectrum sharing (DSS) | Ericsson | imported from 3GU |
R1‑2101561 | Enhanced cross-carrier scheduling for DSS | Ericsson | imported from 3GU |
R1‑2101562 | Study on single DCI scheduling PDSCH on multiple cells | Ericsson | imported from 3GU |
R1‑2101563 | Reduced Latency SCell Activation | Ericsson | imported from 3GU |
R1‑2101564 | 1024QAM for NR DL | Ericsson | imported from 3GU |
R1‑2101565 | Interoperation between cross-carrier scheduling and multiple TRPs | ASUSTeK | imported from 3GU |
R1‑2101566 | Efficient activation/deactivation of SCell | ASUSTeK | imported from 3GU |
R1‑2101567 | Power saving adaptation during Active Time | ASUSTeK | imported from 3GU |
R1‑2101568 | Discussion on beam management for multi-TRP | ITRI | imported from 3GU |
R1‑2101569 | Discussion on LBT mode | ITRI | imported from 3GU |
R1‑2101570 | Discussion on intra-UE multiplexing | ITRI | imported from 3GU |
R1‑2101571 | Remaining issues on sidelink mode 2 | ASUSTeK | imported from 3GU |
R1‑2101572 | Discussion on partial sensing and SL DRX impact | ASUSTeK | imported from 3GU |
R1‑2101573 | Discussion on remaining issues on 2-step RACH | Spreadtrum Communications | imported from 3GU |
R1‑2101574 | Discussion on V2X mode 2 enhancements | ASUSTeK | imported from 3GU |
R1‑2101575 | PDCCH monitoring at reduced capability UE | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101576 | Enhancements for PUCCH repetition | Lenovo, Motorola Mobility | imported from 3GU |
R1‑2101577 | Discussion on UCI multiplexing for partial PUSCH mode 1 | Samsung, Huawei, HiSilicon | imported from 3GU |
R1‑2101578 | Draft 36.212 CR on UCI multiplexing for partial PUSCH mode 1 | Samsung, Huawei, HiSilicon | imported from 3GU |
R1‑2101579 | Discussion on group scheduling for RRC_CONNECTED UEs | CHENGDU TD TECH LTD. | imported from 3GU |
R1‑2101580 | Discussion on skipping vs UCI multiplexing on configured PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101581 | Maintenance for resource allocation mechanism mode 1 | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101582 | Maintenance for sidelink synchronization and mode 2 | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101583 | Maintenance for sidelink physical layer procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101584 | Corrections on UCI enhancement for Rel-16 URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101585 | Corrections on scheduling/HARQ for Rel-16 URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101586 | Corrections on enhanced configured grant transmission for Rel-16 URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101587 | Remaining issues on Rel-16 NR UE features | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101588 | Summary on UE features for two-step RACH | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101589 | Summary on UE features for NR-U | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101590 | Summary on UE features for URLLC/IIoT | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101591 | Summary on UE features for NR positioning | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101592 | Summary on UE features for MR-DC/CA | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101593 | Summary on UE features for CLI/RIM | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101594 | Summary on UE features for TEIs | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101595 | Summary on NR UE features for others | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101596 | Summary on Rel-16 NR TEI related discussion | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101597 | Discussion on multi-beam operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101598 | Discussion on MTRP for reliability | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101599 | Discussion on inter-cell multi-TRP operations | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101600 | Discussion on beam management for MTRP | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101601 | Discussion on HST-SFN deployment | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101602 | Discussion on SRS enhancement | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101603 | Discussion on CSI enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101604 | Discussion on UL dense deployment | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101605 | Initial access aspects for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101606 | PDCCH monitoring enhancements for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101607 | PUCCH format 0/1/4 enhancements for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101608 | Beam based operation for new SCSs for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101609 | PDSCH/PUSCH enhancements for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101610 | Channel access mechanism for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101611 | Potential enhancements for NR from 52.6 to 71 GHz | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101612 | Discussion on HARQ-ACK feedback enhancements for Rel.17 URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101613 | Discussion on CSI feedback enhancements for Rel.17 URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101614 | Discussion on enhancements for unlicensed band URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101615 | Discussion on intra-UE multiplexing/prioritization for Rel.17 URLLC | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101616 | Discussion on timing relationship enhancements for NTN | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101617 | Discussion on UL-AoA positioning enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101618 | Discussion on DL-AoD positioning enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101619 | Discussion on UE complexity reduction for RedCap | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101620 | Discussion on higher layer support of RedCap | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101621 | Discussion on coverage recovery for RedCap | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101622 | Discussion on paging enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101623 | Discussion on TRS/CSI-RS occasion for idle/inactive UEs | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101624 | Discussion on extension to DCI-based power saving adaptation | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101625 | PUSCH enhancements for coverage enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101626 | PUCCH enhancements for coverage enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101627 | Type A PUSCH repetitions for Msg3 for coverage enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101628 | Resource multiplexing between child and parent links of an IAB node | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101629 | Other enhancements for simultaneous operation of IAB-node’s child and parent links | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101630 | Discussion on sidelink resource allocation for power saving | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101631 | Resource allocation for reliability and latency enhancements | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101632 | Discussion on cross-carrier scheduling enhancements for NR DSS | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101633 | Discussion on multi-cell PDSCH scheduling via a single DCI for NR DSS | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101634 | Discussion on efficient activation/deactivation mechanism for SCells | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101635 | Discussion on traffic model for XR | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101636 | Discussion on evaluation methodology for XR | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101637 | Study on the reliability for RRC_CONNECTED UEs | CHENGDU TD TECH LTD. | imported from 3GU |
R1‑2101638 | Basic functions for MBS for RRC_IDLE/RRC_INACTIVE UEs | CHENGDU TD TECH LTD. | imported from 3GU |
R1‑2101639 | Effects of NR MBS on PDSCH and PDCCH | CHENGDU TD TECH LTD. | imported from 3GU |
R1‑2101640 | Potential enhancement for UE complexity reduction | TCL Communication Ltd. | imported from 3GU |
R1‑2101641 | Enhancements on PUSCH repetition type A | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101642 | TB processing over multi-slot PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101643 | Joint channel estimation for PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑2101644 | Enhancements on Multi-Beam Operation | TCL Communication Ltd | imported from 3GU |
R1‑2101645 | Discussion on the feasibility and limitations of paging subgrouping | ZTE , Sanechips | imported from 3GU |
R1‑2101646 | Discussion on TB processing over multi-slot PUSCH | MediaTek Inc. | imported from 3GU |
R1‑2101647 | Feasibility and benefits for NR Sidelink mode 2 enhancements | CEWiT | imported from 3GU |
R1‑2101648 | Discussion on UL time and frequency synchronization for NTN | PANASONIC R&D Center Germany | imported from 3GU |
R1‑2101649 | Remaining issues on type-1 HARQ-ACK codebook considering multiple sidelink reosurce pools | ASUSTeK | imported from 3GU |
R1‑2101650 | Remaining issues on sidelink procedure | ASUSTeK | imported from 3GU |
R1‑2101651 | Remaining issues for multi PUSCHs in NR-U | ASUSTeK | imported from 3GU |
R1‑2101652 | Remaining issues for CG PUSCH in NR-U | ASUSTeK | imported from 3GU |
R1‑2101653 | Discussion on enhancement on Multi-TRP PDCCH | ASUSTeK | imported from 3GU |
R1‑2101654 | On PDCCH, PUCCH and PUSCH enhancements | Ericsson | imported from 3GU |
R1‑2101655 | Discussion on cross-carrier scheduling from Scell to Pcell | ASUSTeK | imported from 3GU |
R1‑2101656 | Enhancements on PUSCH repetiton type A | Xiaomi | imported from 3GU |
R1‑2101657 | Discussion on multi-cell PDSCH scheduling via a single DCI | ASUSTeK | imported from 3GU |
R1‑2101658 | Discussion on mechanisms to support group scheduling for RRC_CONNECTED UEs | ASUSTeK | imported from 3GU |
R1‑2101659 | Discussion on UE complexity reduction | ASUSTeK | imported from 3GU |
R1‑2101660 | Higher layer support of reduced capability NR devices | ASUSTeK | imported from 3GU |
R1‑2101661 | Discussion on other consideration for reduced capability UE | ASUSTeK | imported from 3GU |
R1‑2101662 | Enhancements on Multi-TRP for PDCCH, PUCCH and PUSCH | TCL Communication Ltd. | imported from 3GU |
R1‑2101663 | Resource allocation for power saving with partial sensing in NR sidelink enhancement | ITL | imported from 3GU |
R1‑2101664 | On paging enhancements for UE power saving | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101665 | On RS information to IDLE/Inactive mode Ues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101666 | UE power saving enhancements for Active Time | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101667 | [Draft] Reply LS on Paging Enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101668 | RAN1#104-e Meeting Invitation, Timelines, Scope, Process | RAN1 Chair, ETSI MCC | imported from 3GU |
R1‑2101669 | Additional Guidelines for RAN1#104 e-Meeting Management | RAN1 Chair | imported from 3GU |
R1‑2101670 | Summary#1 on UCI enhancements for R16 URLLC | OPPO | imported from 3GU |
R1‑2101671 | Correction on DL/UL channel access procedure for NR-U | WILUS Inc. | imported from 3GU |
R1‑2101672 | Discussion on initial access aspects for NR beyond 52.6GHz | WILUS Inc. | imported from 3GU |
R1‑2101673 | Discussion on PUCCH enhancement for PUCCH format 0/1/4 | WILUS Inc. | imported from 3GU |
R1‑2101674 | Discussion on PDSCH/PUSCH enhancements for NR beyond 52.6GHz | WILUS Inc. | imported from 3GU |
R1‑2101675 | Discussion on HARQ-ACK enhancement for URLLC/IIoT | WILUS Inc. | imported from 3GU |
R1‑2101676 | Discussion on enhancement for unlicensed URLLC/IIoT | WILUS Inc. | imported from 3GU |
R1‑2101677 | Discussion on intra-UE multiplexing/prioritization for URLLC/IIoT | WILUS Inc. | imported from 3GU |
R1‑2101678 | Discussion on higher layer support of Redcap UE | WILUS Inc. | imported from 3GU |
R1‑2101679 | Discussion on enhancements on PUSCH repetition type A | WILUS Inc. | imported from 3GU |
R1‑2101680 | Discussion on TB processing over multi-slot PUSCH | WILUS Inc. | imported from 3GU |
R1‑2101681 | Discussion on joint channel estimation for PUSCH | WILUS Inc. | imported from 3GU |
R1‑2101682 | Discussion on PUCCH enhancements for coverage enhancement | WILUS Inc. | imported from 3GU |
R1‑2101683 | Discussion on Type A PUSCH repetitions for Msg3 | WILUS Inc. | imported from 3GU |
R1‑2101684 | Enhancements on SRS for coverage and capacity | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101685 | Remaining issues on Rel-16 eMIMO UE features | vivo | imported from 3GU |
R1‑2101686 | On beam management enhancements for simultaneous multi-TRP transmission with multi-panel reception | Ericsson | imported from 3GU |
R1‑2101687 | CSI enhancements for Multi-TRP and FR1 FDD reciprocity | Ericsson | imported from 3GU |
R1‑2101688 | Draft CR on DL SPS based PDSCH repetitions | Ericsson | imported from 3GU |
R1‑2101689 | Revised Rel-17 NR IIoT/URLLC Work Plan | Nokia (Rapporteur) | imported from 3GU |
R1‑2101690 | Maintenance for multi-DCI based multi-TRP in Rel-16 | Ericsson | imported from 3GU |
R1‑2101691 | Maintenance for single-DCI based multi-TRP in Rel-16 | Ericsson | imported from 3GU |
R1‑2101692 | Discussion on enhancement of time and frequency synchronization for NB-IoT over satellite | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101693 | Discussion on Beam Management for NTN | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101694 | Discussion on Timing Relationship Enhancements for NTN | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101695 | Resource multiplexing and DC in enhanced IAB | Ericsson | imported from 3GU |
R1‑2101696 | Timing, CLI and power control in enhanced IAB | Ericsson | imported from 3GU |
R1‑2101697 | Response to RAN3 LS on inter-donor topology redundancy | Ericsson | imported from 3GU |
R1‑2101698 | Support of 16-QAM for unicast in UL and DL in NB-IoT | Ericsson | imported from 3GU |
R1‑2101699 | Support of 14 HARQ processes in DL in LTE-MTC | Ericsson, AT&T, SoftBank, Telefónica, Verizon | imported from 3GU |
R1‑2101700 | Support of a maximum DL TBS of 1736 bits in LTE-MTC | Ericsson | imported from 3GU |
R1‑2101701 | Compendium of 16-QAM simulation results in UL and DL for NB-IoT | Ericsson | imported from 3GU |
R1‑2101702 | PUR maintenance issues for Rel-16 LTE-MTC | Ericsson | imported from 3GU |
R1‑2101703 | PUR maintenance issues for Rel-16 NB-IoT | Ericsson | imported from 3GU |
R1‑2101704 | [Draft] LS on per-table MCS range for mode-2 | Ericsson | imported from 3GU |
R1‑2101705 | [Draft] LS on SL DRX design | Ericsson | imported from 3GU |
R1‑2101706 | [Draft] LS on SL switching priority | Ericsson | imported from 3GU |
R1‑2101707 | Draft_CR_TS38.212 | Ericsson | imported from 3GU |
R1‑2101708 | Draft_CR_TS38.213 | Ericsson | imported from 3GU |
R1‑2101709 | Draft_CR_TS38.306 | Ericsson | imported from 3GU |
R1‑2101710 | Enhancements on PUSCH repetition type A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101711 | Transport block processing for PUSCH coverage enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101712 | Joint channel estimation for PUSCH coverage enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101713 | PUCCH coverage enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101714 | Approaches and solutions for Type A PUSCH repetitions for Msg3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101715 | On the scope of RAN1 LS on phase and power requirements for joint channel estimation/DM-RS bundling of PUSCH and PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101716 | UL time synchronization methods for NTN systems | CEWiT,IITM,IITH,Tejas Networks, | imported from 3GU |
R1‑2101717 | UL time synchronization methods for NTN systems | CEWiT,IITM,IITH,Tejas Networks,Reliance Jio | imported from 3GU |
R1‑2101718 | Discussion on UE complexity reduction | China Unicom | imported from 3GU |
R1‑2101719 | Discussion on LS on AN-PDB and PER targets for satellite access | Intel Corporation | imported from 3GU |
R1‑2101720 | Paging indication based on sub-time units | InterDigital, Inc. | imported from 3GU |
R1‑2101721 | Feature lead summary on RAN basic functions for broadcast/multicast for UEs in RRC_IDLE/ RRC_INACTIVE states | Moderator (BBC) | imported from 3GU |
R1‑2101722 | Draft CR on Type-1 HARQ-ACK for PDSCH repetition with different SCSs in DL and UL | Ericsson | imported from 3GU |
R1‑2101723 | Draft CR on Type-1 HARQ-ACK for PDSCH repetition with different SCSs in DL and UL | Ericsson | imported from 3GU |
R1‑2101724 | UE type definition for RedCap UEs | FUTUREWEI | imported from 3GU |
R1‑2101725 | UE capability framework for RedCap UEs | FUTUREWEI | imported from 3GU |
R1‑2101726 | Mechanisms to support group scheduling for RRC_CONNECTED Ues | Ericsson | imported from 3GU |
R1‑2101727 | Discussion on reliability mechanisms for NR MBS | Ericsson | imported from 3GU |
R1‑2101728 | Support for NR multicast reception in RRC Inactive/Idle | Ericsson | imported from 3GU |
R1‑2101729 | Assumptions for Performance Evaluations of NR-MBS | Ericsson | imported from 3GU |
R1‑2101730 | LTE SC-PTM design as a reference for NR MBS in IDLE/INACTIVE | Huawei, HiSilicon | imported from 3GU |
R1‑2101731 | Corrections to positioning SRS and higher layer parameters | Huawei, HiSilicon | imported from 3GU |
R1‑2101732 | Correction on PSBCH payload generation | Huawei, HiSilicon | imported from 3GU |
R1‑2101733 | Correction on determination of PSFCH resources based on a set of configured PRBs | Huawei, HiSilicon | imported from 3GU |
R1‑2101734 | Discussion on RAN2 LS on per-table MCS range for mode-2 | Huawei, HiSilicon | imported from 3GU |
R1‑2101735 | Discussion on RAN4 LS on SL switching priority | Huawei, HiSilicon | imported from 3GU |
R1‑2101736 | Discussion on RAN2 LS on DRX impact | Huawei, HiSilicon | imported from 3GU |
R1‑2101737 | Discussion on UE capability xDD differentiation for SUL/SDL bands | Huawei, HiSilicon | imported from 3GU |
R1‑2101738 | Discussion on the remaining problems of supporting Tx switching between two uplink carriers | Huawei, HiSilicon | imported from 3GU |
R1‑2101739 | Discussion on remaining issues of UL skipping for CG PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑2101740 | Analysis on power consumption for IDLE mode UE | Huawei, HiSilicon | imported from 3GU |
R1‑2101741 | Discussion on TCI state indication at Direct SCell activation | Huawei, HiSilicon | imported from 3GU |
R1‑2101742 | Discussion on use of simultaneous CSI-RS resources and ports | Huawei, HiSilicon | imported from 3GU |
R1‑2101743 | Correction on PUSCH frequency hopping in 38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑2101744 | Correction on out-of-order HARQ operation in 38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑2101745 | Discussion on LS on half-duplex operation | Huawei, HiSilicon | imported from 3GU |
R1‑2101746 | Discussion on LS on paging enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑2101747 | Discussion on measuring CSI-RS during SCell activation | Huawei, HiSilicon | imported from 3GU |
R1‑2101748 | Discussion on the AN-PDB and PER targets for satellite access | Huawei, HiSilicon | imported from 3GU |
R1‑2101749 | Discussion on inter-donor topology redundancy | Huawei, HiSilicon | imported from 3GU |
R1‑2101750 | On changes to multi-TRP description in Stage 2 | Huawei, HiSilicon | imported from 3GU |
R1‑2101751 | Corrections on SCell dormancy in TS 38.212 | Huawei, HiSilicon | imported from 3GU |
R1‑2101752 | Corrections on CCS with different subcarrier spacings for PDCCH and PDSCH in TS 38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑2101753 | Discussion on LS on new standardized 5QIs for 5G-AIS | Huawei, HiSilicon | imported from 3GU |
R1‑2101754 | Techniques mitigating UE Rx/Tx timing delays | Ericsson | imported from 3GU |
R1‑2101755 | Enhancements of UL-AoA positioning solutions | Ericsson | imported from 3GU |
R1‑2101756 | Enhancements of DL-AoD positioning solutions | Ericsson | imported from 3GU |
R1‑2101757 | PRS with Cyclic shifts | Ericsson | imported from 3GU |
R1‑2101758 | Maintenance of NR positioning support | Ericsson | imported from 3GU |
R1‑2101759 | Remaining details for Resource allocation for sidelink - Mode 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101760 | Remaining details for Physical layer structure for sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2101761 | On FDD channel reciprocity in real-world scenarios | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑2101762 | Evaluation methodology for XR | Ericsson | imported from 3GU |
R1‑2101763 | Feature lead summary on PUSCH enhancements for NR eURLLC in AI 7.2.5 | Moderator (Apple Inc.) | imported from 3GU |
R1‑2101764 | FL summary of accuracy improvements by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | Moderator (CATT) | imported from 3GU |
R1‑2101765 | LS on XR-Traffic Models | SA4, Qualcomm | imported from 3GU |
R1‑2101766 | Complexity Reduction for RedCap Devices | Qualcomm Incorporated | imported from 3GU |
R1‑2101767 | Summary#1 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101768 | RAN1#104-e preparation phase initial summary on NR Rel-15 CRs | Ad-hoc chair (Samsung) | imported from 3GU |
R1‑2101769 | RAN1#104-e preparation phase final summary on NR Rel-15 CRs | Ad-hoc chair (Samsung) | imported from 3GU |
R1‑2101770 | Feature lead summary#1 on NR-U HARQ and Multi-PUSCH maintenance | Moderator (Huawei) | imported from 3GU |
R1‑2101771 | FL summary on support of unaligned frame boundary for R16 NR inter-band CA | Moderator (CMCC) | imported from 3GU |
R1‑2101772 | Summary of UE features for 5G V2X | Moderator (AT&T) | imported from 3GU |
R1‑2101773 | Summary of UE features for eMIMO | Moderator (AT&T) | imported from 3GU |
R1‑2101774 | Summary of UE features for NR mobility enhancements | Moderator (AT&T) | imported from 3GU |
R1‑2101775 | Multi-TRP enhancements for beam management | Intel Corporation | imported from 3GU |
R1‑2101776 | Summary of PDSCH/PUSCH enhancements (Bandwidth/Timeline/Reference signals) | Moderator (vivo) | imported from 3GU |
R1‑2101777 | Discussion on UE complexity reduction | OPPO | imported from 3GU |
R1‑2101778 | Joint channel estimation for PUSCH | OPPO | imported from 3GU |
R1‑2101779 | Market expectations for IoT over NTN | NOVAMINT | imported from 3GU |
R1‑2101780 | Discussions on PDSCH/PUSCH enhancements | InterDigital, Inc. | imported from 3GU |
R1‑2101781 | Summary of AI 8.4.3 for HARQ in NTN | Moderator (ZTE) | imported from 3GU |
R1‑2101782 | Summary of Rel-16 uplink Tx switching | Moderator (China Telecom) | imported from 3GU |
R1‑2101783 | FL summary #1 on SRS enhancements | Moderator (ZTE) | imported from 3GU |
R1‑2101784 | Summary of Multi-TRP for PUCCH and PUSCH | Moderator (Nokia) | imported from 3GU |
R1‑2101785 | Draft reply LS on SL DRX design | LG Electronics | imported from 3GU |
R1‑2101786 | Discussion on feasibility and benefits for mode 2 enhancements | LG Electronics | imported from 3GU |
R1‑2101787 | Paging enhancements for UE power saving | InterDigital, Inc. | imported from 3GU |
R1‑2101788 | Considerations on partial sensing and DRX in NR V2X | Fujitsu | imported from 3GU |
R1‑2101789 | Discussion on Multi-cell PDSCH Scheduling via a Single DCI | ZTE | imported from 3GU |
R1‑2101790 | Resource allocation for sidelink power saving | vivo | imported from 3GU |
R1‑2101791 | Discussion on mode-2 enhancements | vivo | imported from 3GU |
R1‑2101792 | Moderator summary of MR DC-CA pre-meeting preparation phase | Moderator (Nokia) | imported from 3GU |
R1‑2101793 | Feature lead summary#1 on timing relationship enhancements | Moderator (Ericsson) | imported from 3GU |
R1‑2101794 | FL Summary for Enhancements for PUCCH formats 0/1/4 | Moderator (Ericsson) | imported from 3GU |
R1‑2101795 | Feature lead summary for Maintenance of UL Signals and Channels | Moderator (Ericsson) | imported from 3GU |
R1‑2101796 | FL summary for initial access signals and channels | Moderator (Qualcomm) | imported from 3GU |
R1‑2101797 | Preparation phase email discussion summary | Moderator (Qualcomm) | imported from 3GU |
R1‑2101798 | FL summary on channel access mechanism for 60GHz band | Moderator (Qualcomm) | imported from 3GU |
R1‑2101799 | Summary #1 of PDSCH/PUSCH enhancements (Scheduling/HARQ) | Moderator (LG Electronics) | imported from 3GU |
R1‑2101800 | Feature lead summary #1 on AI 7.2.4 Sidelink synchronization mechanism | Moderator (CATT) | imported from 3GU |
R1‑2101801 | FL summary #1 on other issues in NR Sidelink enhancement | Moderator (CATT) | imported from 3GU |
R1‑2101802 | Summary#1 of AI 8.15.1 Scenarios applicable to NB-IoT/eMTC | Moderator (MediaTek) | imported from 3GU |
R1‑2101803 | Summary#1 of AI 8.15.2 Enhancements to time and frequency synchronization | Moderator (MediaTek) | imported from 3GU |
R1‑2101804 | Feasibility and benefits of mode 2 enhancements for inter-UE coordination | Ericsson | imported from 3GU |
R1‑2101805 | Feature lead summary #1 on enhancements on UL timing and frequency synchronization | Moderator (Thales) | imported from 3GU |
R1‑2101806 | Summary #1 of 8.4.4 Other Aspects of NR-NTN | Moderator (OPPO) | imported from 3GU |
R1‑2101807 | Feature lead summary#1 on Resource allocation for NR sidelink Mode 1 | Moderator (Ericsson) | imported from 3GU |
R1‑2101808 | Feature lead summary#2 on Resource allocation for NR sidelink Mode 1 | Moderator (Ericsson) | imported from 3GU |
R1‑2101809 | Feature lead summary on Mode-2 resource allocation issues in Rel.16 5G V2X | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101810 | Enhancements for IAB interference management | AT&T | imported from 3GU |
R1‑2101811 | Feature lead summary #1 on CSI feedback enhancements for enhanced URLLC/IIoT | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2101812 | RAN1#104-e preparation phase on Maintenance of E-UTRA Releases 8-15 | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2101813 | FL summary of PUCCH coverage enhancement | Moderator (Qualcomm) | imported from 3GU |
R1‑2101814 | Summary of email discussion on preparation phase for Rel-16 URLLC/IIoT | Moderator (Huawei) | imported from 3GU |
R1‑2101815 | Feature lead summary on PDCCH enhancements | Moderator (Huawei) | imported from 3GU |
R1‑2101816 | Feature lead summary on propagation delay compensation enhancements | Moderator (Huawei) | imported from 3GU |
R1‑2101817 | Moderator summary #1 on HARQ-ACK feedback enhancements for NR Rel-17 URLLC/IIoT | Moderator (Nokia) | imported from 3GU |
R1‑2101818 | Moderator summary #2 on HARQ-ACK feedback enhancements for NR Rel-17 URLLC/IIoT | Moderator (Nokia) | imported from 3GU |
R1‑2101819 | Discussion on the data channel enhancements for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2101820 | Evaluation results for 52.6 to 71GHz | ZTE, Sanechips | imported from 3GU |
R1‑2101821 | RAN1#104-e preparation phase on LSs | RAN1 Chair | imported from 3GU |
R1‑2101822 | Summary#1 for enhancements on HARQ | Moderator (Samsung) | imported from 3GU |
R1‑2101823 | Initial summary for introduction of 1024QAM for NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2101824 | Summary on Others for URLLC and IIOT | Moderator (LG Electronics) | imported from 3GU |
R1‑2101825 | Summary of [104-e-NR-L1enh-URLLC-05] | Moderator (LG Electronics) | imported from 3GU |
R1‑2101826 | Issue Summary for initial access aspect of NR extension up to 71 GHz | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101827 | Summary #1 of email discussion on initial access aspect of NR extension up to 71 GHz | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101828 | Feature lead summary#1 on NR-U CG | Moderator (vivo) | imported from 3GU |
R1‑2101829 | Feature lead summary on Enhancements on Multi-TRP inter-cell operation | Moderator (vivo) | imported from 3GU |
R1‑2101830 | Summary#1 - URLLC/IIoT operation on Unlicensed Band | Moderator (Ericsson) | imported from 3GU |
R1‑2101831 | Summary on email discussion [104-e-NR-Pos-04] for R1-2100320 | Moderator (CATT) | imported from 3GU |
R1‑2101832 | Summary on [104-e-NR-UEFeature-NRU-01] | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101833 | Summary on [104-e-NR-UEFeature-URLLCIIoT-01] | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101834 | Summary on [104-e-NR-UEFeature-Others-01] | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2101835 | Feature Leads Summary for NR Positioning Maintenance – AI 7.2.8 | Moderator (Intel Corporation), CATT, Ericsson, Qualcomm | imported from 3GU |
R1‑2101836 | Summary of E-mail Discussion [104-e-NR-Pos-01] | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101837 | FL summary#1 on improving reliability for MBS for RRC_CONNECTED UEs | Moderator (Huawei) | imported from 3GU |
R1‑2101838 | Summary #1 of email discussions [104-e-NR-feMIMO-02] for mTRP PDCCH enhancements | Moderator (Qualcomm) | imported from 3GU |
R1‑2101839 | Summary #2 of email discussions [104-e-NR-feMIMO-02] for mTRP PDCCH enhancements | Moderator (Qualcomm) | imported from 3GU |
R1‑2101840 | Summary #1 of the Remaining Issues on HARQ and Scheduling Enhancements for URLLC | Moderator (Qualcomm) | imported from 3GU |
R1‑2101841 | Summary#1 of email thread [104-e-NR-L1enh-URLLC-02] | Moderator (OPPO) | imported from 3GU |
R1‑2101842 | Summary#1 of email thread [104-e-NR-R17-IIoT_URLLC-04] | Moderator (OPPO) | imported from 3GU |
R1‑2101843 | Feature lead summary for AI 8.11.1.2 Feasibility and benefits for mode 2 enhancements | Moderator (LG Electronics) | imported from 3GU |
R1‑2101844 | FL summary of AI 8.15.3 | Moderator (Sony) | imported from 3GU |
R1‑2101845 | Feature Lead Summary [104-e-LTE-Rel17_NB_IoT_eMTC-02] 1st check point | Moderator (Ericsson) | imported from 3GU |
R1‑2101846 | Feature Lead Summary [104-e-LTE-Rel17_NB_IoT_eMTC-02] 2nd check point | Moderator (Ericsson) | imported from 3GU |
R1‑2101847 | Feature Lead Summary [104-e-LTE-Rel17_NB_IoT_eMTC-02] 3rd check point | Moderator (Ericsson) | imported from 3GU |
R1‑2101848 | Feature Lead Summary [104-e-LTE-Rel17_NB_IoT_eMTC-02] final | Moderator (Ericsson) | imported from 3GU |
R1‑2101849 | FL summary #1 for UE complexity reduction for RedCap | Moderator (Ericsson) | imported from 3GU |
R1‑2101850 | FL summary #2 for UE complexity reduction for RedCap | Moderator (Ericsson) | imported from 3GU |
R1‑2101851 | FL summary #3 for UE complexity reduction for RedCap | Moderator (Ericsson) | imported from 3GU |
R1‑2101852 | FL summary #4 for UE complexity reduction for RedCap | Moderator (Ericsson) | imported from 3GU |
R1‑2101853 | Feature lead summary#1 for physical layer procedure aspects in AI 7.2.4 | Moderator (LG Electronics) | imported from 3GU |
R1‑2101854 | Summary#2 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101855 | Summary #1 of [104-e-NR-eIAB-01] | Moderator (AT&T) | imported from 3GU |
R1‑2101856 | Moderator summary#2 for multi-beam enhancement (round 1) | Moderator (Samsung) | imported from 3GU |
R1‑2101857 | Views on Rel. 17 CSI enhancements | Samsung | imported from 3GU |
R1‑2101858 | Summary #2 of PDSCH/PUSCH enhancements (Scheduling/HARQ) | Moderator (LG Electronics) | imported from 3GU |
R1‑2101859 | Feature Lead Summary #1 for NR Positioning UL-AoA Enhancements | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101860 | Feature Lead Summary #2 for NR Positioning UL-AoA Enhancements | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101861 | Summary of [104-e-NR-7.1CRs-09] Correction on UE sounding procedure | Moderator (CATT) | imported from 3GU |
R1‑2101862 | Moderator summary on beam management for M-TRP (round 0) | Moderator (CATT) | imported from 3GU |
R1‑2101863 | Summary of Email discussion [104-e-NR-DSS-01] | Moderator (Ericsson) | imported from 3GU |
R1‑2101864 | Feature lead summary#1 on multi-cell scheduling via a single DCI | Moderator (Lenovo) | imported from 3GU |
R1‑2101865 | Summary#1 of AI: 8.1.2.4 Enhancements on HST-SFN deployment | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101866 | Evaluation Methodology including identification of KPIs of interest for relevant deployment scenarios | Moderator (vivo) | imported from 3GU |
R1‑2101867 | Summary#3 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101868 | Feature lead summary #1 on 104-e-LTE-Rel17_NB_IoT_eMTC-01 | Moderator (Huawei) | imported from 3GU |
R1‑2101869 | Summary#2 of AI 8.15.1 Scenarios applicable to NB-IoT/eMTC | Moderator (MediaTek) | imported from 3GU |
R1‑2101870 | Summary#2 of AI 8.15.2 Enhancements to time and frequency synchronization | Moderator (MediaTek) | imported from 3GU |
R1‑2101871 | Feature lead summary #2 on enhancements on UL timing and frequency synchronization | Moderator (Thales) | imported from 3GU |
R1‑2101872 | Feature lead summary for [104-e-NR-NRU-01] Email discussion/approval on DL signals and channels | Moderator (Lenovo) | imported from 3GU |
R1‑2101873 | Feature lead summary for [104-e-NR-NRU-05] Email discussion/approval on reply LS to R1-2100008 | Moderator (Lenovo) | imported from 3GU |
R1‑2101874 | Feature lead summary for [104-e-NR-52-71GHz-02] Email discussion/approval on PDCCH monitoring enhancements | Moderator (Lenovo) | imported from 3GU |
R1‑2101875 | Summary#4 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101876 | Feature lead summary#2 on RAN basic functions for broadcast/multicast for UEs in RRC_IDLE/ RRC_INACTIVE states | Moderator (BBC) | imported from 3GU |
R1‑2101877 | Feature lead summary#3 on RAN basic functions for broadcast/multicast for UEs in RRC_IDLE/ RRC_INACTIVE states | Moderator (BBC) | imported from 3GU |
R1‑2101878 | Summary #1 of [104-e-NR-eIAB-02] on other enhancements for simultaneous operation of IAB-node’s child and parent links | Moderator (Qualcomm) | imported from 3GU |
R1‑2101879 | Feature lead summary #2 on CSI feedback enhancements for enhanced URLLC/IIoT | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2101880 | Reply LS on inter-donor topology redundancy | RAN1, Samsung | imported from 3GU |
R1‑2101881 | PUSCH skipping considering physical layer priority & LCH based prioritization | Apple | imported from 3GU |
R1‑2101882 | Corrections to 36.214 for Reference Point for eNB Rx – Tx time difference | CATT | imported from 3GU |
R1‑2101883 | Discussion summary #1 of [104-e-NR-52-71GHz-05] | Moderator (vivo) | imported from 3GU |
R1‑2101884 | Summary of CSI enhancements for MTRP and FDD (Round 0) | Moderator (Huawei) | imported from 3GU |
R1‑2101885 | Summary of CSI enhancements for MTRP and FDD (Round 1) | Moderator (Huawei) | imported from 3GU |
R1‑2101886 | Summary of CSI enhancements for MTRP and FDD (Round 2) | Moderator (Huawei) | imported from 3GU |
R1‑2101887 | Email discussion summary for channel access for 52.6-71GHz | Moderator (Qualcomm) | imported from 3GU |
R1‑2101888 | Summary of [104-e-NR-7.1CRs-06] Correction on MCS values for PT-RS time density determination in TS 38.214 | Moderator (Sharp) | imported from 3GU |
R1‑2101889 | Summary of [104-e-NR-eIAB-01] – 1st Checkpoint | Moderator (AT&T) | imported from 3GU |
R1‑2101890 | Summary of [104-e-NR-eIAB-01] – 2nd Checkpoint | Moderator (AT&T) | imported from 3GU |
R1‑2101891 | Summary of [104-e-NR-eIAB-01] – 3rd Checkpoint | Moderator (AT&T) | imported from 3GU |
R1‑2101892 | Summary for introduction of 1024QAM for NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2101893 | FL summary#1 of power saving for Active Time | Moderator (vivo) | imported from 3GU |
R1‑2101894 | FL summary#2 of power saving for Active Time | Moderator (vivo) | imported from 3GU |
R1‑2101895 | Discussion summary of [104-e-NR-52-71GHz-04] | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2101896 | Feature lead summary#2 on propagation delay compensation enhancements | Moderator (Huawei) | imported from 3GU |
R1‑2101897 | Summary of email discussion for [104-e-NR-2step-RACH-01] | Moderator (ZTE) | imported from 3GU |
R1‑2101898 | Draft CR on DMRS configuration for MsgA in 38.214 | Moderator (ZTE) | imported from 3GU |
R1‑2101899 | Draft CR on transmission timing adjustment procedure in 38.213 | Moderator (ZTE) | imported from 3GU |
R1‑2101900 | Summary #2 of Multi-TRP for PUCCH and PUSCH | Moderator (Nokia) | imported from 3GU |
R1‑2101901 | Summary #2 of 8.4.4 Other Aspects of NR-NTN | Moderator (OPPO) | imported from 3GU |
R1‑2101902 | Summary#2 - URLLC/IIoT operation on Unlicensed Band | Moderator (Ericsson) | imported from 3GU |
R1‑2101903 | Summary#2 of AI 8.4.3 for HARQ in NTN | Moderator (ZTE) | imported from 3GU |
R1‑2101904 | Feature lead summary#2 on timing relationship enhancements | Moderator (Ericsson) | imported from 3GU |
R1‑2101905 | Summary #2 of email discussion on initial access aspect of NR extension up to 71 GHz | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101906 | FL summary#2 on improving reliability for MBS for RRC_CONNECTED UEs | Moderator (Huawei) | imported from 3GU |
R1‑2101907 | Summary#5 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101908 | Feature Lead Summary [104-e-LTE-Rel17_NB_IoT_eMTC-03] 1st check point | Moderator (Sony) | imported from 3GU |
R1‑2101909 | Summary #2 of [104-e-NR-eIAB-02] on other enhancements for simultaneous operation of IAB-node’s child and parent links | Moderator (Qualcomm) | imported from 3GU |
R1‑2101910 | Reliability and Latency Enhancements for Mode 2 | Qualcomm Incorporated | imported from 3GU |
R1‑2101911 | Discussion on mode-2 enhancements | vivo | imported from 3GU |
R1‑2101912 | Feature lead summary#2 on multi-cell scheduling via a single DCI | Moderator (Lenovo) | imported from 3GU |
R1‑2101913 | Moderator summary#3 for multi-beam enhancement (round 2) | Moderator (Samsung) | imported from 3GU |
R1‑2101914 | FL summary #2 on SRS enhancements | Moderator (ZTE) | imported from 3GU |
R1‑2101915 | [Draft] Reply LS on Rel-16 NR Positioning Correction | Huawei | imported from 3GU |
R1‑2101916 | FL Summary#2 for Enhancements for PUCCH formats 0/1/4 | Moderator (Ericsson) | imported from 3GU |
R1‑2101917 | FL summary #3 on SRS enhancements | Moderator (ZTE) | imported from 3GU |
R1‑2101918 | Reply LS on Rel-16 NR Positioning Correction | RAN1, Huawei | imported from 3GU |
R1‑2101919 | Summary of E-mail Discussion [104-e-NR-Pos-02] | Moderator (Ericsson) | imported from 3GU |
R1‑2101920 | FL summary #1 for AI 8.5.3 Accuracy improvements for DL-AoD positioning solutions | Moderator (Ericsson) | imported from 3GU |
R1‑2101921 | [Draft] LS on the resource reservation period | LG Electronics | imported from 3GU |
R1‑2101922 | LS on the resource reservation period | RAN1, LG Electronics | imported from 3GU |
R1‑2101923 | Moderator summary of [104-e-NR-eMIMO-05] Email discussion/approval of a potential reply LS to R1-2100018 | Moderator (Nokia) | imported from 3GU |
R1‑2101924 | Reply LS on multi-TRP description in Stage-2 | RAN1, Nokia | imported from 3GU |
R1‑2101925 | Summary of [104-e-NR-Pos-03] for the reply LS to R1-2100005 | Moderator (Huawei) | imported from 3GU |
R1‑2101926 | Discussion on Mode 2 enhancements | MediaTek Inc. | imported from 3GU |
R1‑2101927 | CR on Type-1 HARQ-ACK for PDSCH repetition with different SCSs in DL and UL | Ericsson, Samsung | imported from 3GU |
R1‑2101928 | Moderator summary of Email discussion [104-e-NR-7.1CRs-14] | Moderator (Ericsson) | imported from 3GU |
R1‑2101929 | Summary of [104-e-NR-7.1CRs-04] Correction on the search space configuration of PUCCH-Scell | Moderator (Huawei) | imported from 3GU |
R1‑2101930 | Correction on MCS values for PT-RS time density determination in TS 38.214 | Sharp | imported from 3GU |
R1‑2101931 | Correction on MCS values for PT-RS time density determination in TS 38.214 | Sharp | imported from 3GU |
R1‑2101932 | Summary#1 of efficient SCell activation/de-activation mechanism of NR CA | Moderator (Huawei) | imported from 3GU |
R1‑2101933 | Summary#2 of efficient SCell activation/de-activation mechanism of NR CA | Moderator (Huawei) | imported from 3GU |
R1‑2101934 | Feature lead summary#2 on Enhancements on Multi-TRP inter-cell operation | Moderator (vivo) | imported from 3GU |
R1‑2101935 | Correction on the search space configuration of PUCCH-SCell | Huawei, HiSilicon | imported from 3GU |
R1‑2101936 | Correction on the search space configuration of PUCCH-SCell | Huawei, HiSilicon | imported from 3GU |
R1‑2101937 | Summary#6 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101938 | Feature lead summary #3 on enhancements on UL timing and frequency synchronization | Moderator (Thales) | imported from 3GU |
R1‑2101939 | Reply LS on Rel-16 updated RAN4 UE features lists for LTE and NR | RAN1, LG Electronics | imported from 3GU |
R1‑2101940 | [Draft] Reply LS on Paging Enhancement | MediaTek | imported from 3GU |
R1‑2101941 | Inter-UE coordination in sidelink resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑2101942 | Email discussion summary#2 for channel access for 52.6-71GHz | Moderator (Qualcomm) | imported from 3GU |
R1‑2101943 | Correction on spectral efficiency of 1024QAM | Huawei, HiSilicon | imported from 3GU |
R1‑2101944 | Correction on spectral efficiency of 1024QAM | Huawei, HiSilicon | imported from 3GU |
R1‑2101945 | Correction for support of 1024QAM for PDSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101946 | Correction for support of 1024QAM for PDSCH | Qualcomm Incorporated | imported from 3GU |
R1‑2101947 | Feature lead summary on [104-e-LTE-6.1CRs-03] | Moderator (Huawei) | imported from 3GU |
R1‑2101948 | Summary for Paging Enhancements | Moderator (MediaTek) | imported from 3GU |
R1‑2101949 | FL summary#2 of AI 8.15.3 | Moderator (Sony) | imported from 3GU |
R1‑2101950 | Summary on [104-e-NR-NRU-04] Email discussion on editorial changes for init access, CG and UL | Moderator (Qualcomm) | imported from 3GU |
R1‑2101951 | FL summary#2 of accuracy improvements by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | Moderator (CATT) | imported from 3GU |
R1‑2101952 | [Draft] Reply LS on AN-PDB and PER targets for satellite access | Qualcomm | imported from 3GU |
R1‑2101953 | Draft Reply LS on the use of simultaneous CSI-RS resources and ports | Ericsson | imported from 3GU |
R1‑2101954 | Summary #3 of email discussions [104-e-NR-feMIMO-02] for mTRP PDCCH enhancements | Moderator (Qualcomm) | imported from 3GU |
R1‑2101955 | Summary#3 - URLLC/IIoT operation on Unlicensed Band | Moderator (Ericsson) | imported from 3GU |
R1‑2101956 | Summary#2 for enhancements on HARQ | Moderator (Samsung) | imported from 3GU |
R1‑2101957 | Summary#3 for enhancements on HARQ | Moderator (Samsung) | imported from 3GU |
R1‑2101958 | PDSCH-PUSCH Enhancement Aspects for NR beyond 52.6 GHz | Charter Communications | imported from 3GU |
R1‑2101959 | Summary#2 for introduction of 1024QAM for NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2101960 | Summary #3 of 8.4.4 Other Aspects of NR-NTN | Moderator (OPPO) | imported from 3GU |
R1‑2101961 | Feature lead summary #3 on CSI feedback enhancements for enhanced URLLC/IIoT | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2101962 | Reply LS on the use of simultaneous CSI-RS resources and ports | RAN1, Ericsson | imported from 3GU |
R1‑2101963 | Correction on UCI multiplexing with PUCCH overriding | CATT | imported from 3GU |
R1‑2101964 | CR on DMRS configuration for MsgA in 38.214 | Moderator (ZTE) | imported from 3GU |
R1‑2101965 | CR on transmission timing adjustment procedure in 38.213 | Moderator (ZTE) | imported from 3GU |
R1‑2101966 | Summary on [104-e-NR-7.1CRs-07] | Moderator (ZTE) | imported from 3GU |
R1‑2101967 | Summary of [104-e-NR-7.1CRs-08] Correction on UCI multiplexing with PUCCH overriding | Moderator (CATT) | imported from 3GU |
R1‑2101968 | Summary of [104-e-NR-7.1CRs-15] Draft CR on Type-2 HARQ -ACK codebook in physical uplink shared channel | Moderator (CATT) | imported from 3GU |
R1‑2101969 | Moderator summary#4 for multi-beam enhancement (round 2B) | Moderator (Samsung) | imported from 3GU |
R1‑2101970 | Summary #3 of email discussion on initial access aspect of NR extension up to 71 GHz | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101971 | Summary #4 of email discussion on initial access aspect of NR extension up to 71 GHz | Moderator (Intel Corporation) | imported from 3GU |
R1‑2101972 | Summary #3 of PDSCH/PUSCH enhancements (Scheduling/HARQ) | Moderator (LG Electronics) | imported from 3GU |
R1‑2101973 | Moderator summary on beam management for M-TRP (round 1) | Moderator (CATT) | imported from 3GU |
R1‑2101974 | Summary#7 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2101975 | [Draft] Reply LS on New Standardized 5QIs for 5G-AIS (Advanced Interactive Services) | OPPO | imported from 3GU |
R1‑2101976 | Reply LS on New Standardized 5QIs for 5G-AIS (Advanced Interactive Services) | RAN1, OPPO | imported from 3GU |
R1‑2101977 | CR on clarification of TPC command for PUCCH | ZTE, Qualcomm | imported from 3GU |
R1‑2101978 | CR on clarification of TPC command for PUCCH | ZTE, Qualcomm | imported from 3GU |
R1‑2101979 | CR on clarification of TPC command for PUCCH | ZTE, Qualcomm | imported from 3GU |
R1‑2101980 | CR on clarification of TPC command for PUCCH | ZTE, Qualcomm | imported from 3GU |
R1‑2101981 | Clarification on power control for NB-IoT | ZTE, Ericsson | imported from 3GU |
R1‑2101982 | Clarification on power control for NB-IoT | ZTE, Ericsson | imported from 3GU |
R1‑2101983 | Summary of email discussion [104-e-LTE-6.1CRs-02] on R1-2100559 (NB-IoT) | Moderator (ZTE) | imported from 3GU |
R1‑2101984 | CR on UCI multiplexing for partial PUSCH mode 1 | Samsung, Huawei, HiSilicon | imported from 3GU |
R1‑2101985 | CR on UCI multiplexing for partial PUSCH mode 1 | Samsung, Huawei, HiSilicon | imported from 3GU |
R1‑2101986 | Summary of [104-e-LTE-6.1CRs-04] on UCI multiplexing for partial PUSCH mode 1 | Moderator (Samsung) | imported from 3GU |
R1‑2101987 | FL summary#3 on improving reliability for MBS for RRC_CONNECTED UEs | Moderator (Huawei) | imported from 3GU |
R1‑2101988 | Correction for cancellation due to PDSCH/CSI-RS/SFI | Qualcomm | imported from 3GU |
R1‑2101989 | Correction for cancellation due to PDSCH/CSI-RS/SFI | Qualcomm | imported from 3GU |
R1‑2101990 | Correction for cancellation due to PDSCH/CSI-RS/SFI | Qualcomm | imported from 3GU |
R1‑2101991 | Correction for cancellation due to PDSCH/CSI-RS/SFI | Qualcomm | imported from 3GU |
R1‑2101992 | Feature lead summary#2 on NR-U HARQ and Multi-PUSCH maintenance | Moderator (Huawei) | imported from 3GU |
R1‑2101993 | Correction of Type-3 HARQ-ACK codebook generation for a PDSCH with one transport block for a configuration with a maximum number of two TBs | Moderator (Huawei) | imported from 3GU |
R1‑2101994 | Correction of UE reception of DL control when a DCI indicates a request for a Type-3 HARQ-ACK codebook report without scheduling PDSCH | Moderator (Huawei) | imported from 3GU |
R1‑2101995 | Correction on PUCCH power control for enhanced Type-2 HARQ-ACK codebook and for Type-3 HARQ-ACK codebook | Moderator (Huawei) | imported from 3GU |
R1‑2101996 | Correction on joint configuration of semi-static repetitions and multi-pusch scheduling | Moderator (Huawei) | imported from 3GU |
R1‑2101997 | Correction on UE sounding procedure | CATT, ZTE | imported from 3GU |
R1‑2101998 | Summary#3 of AI 8.15.1 Scenarios applicable to NB-IoT/eMTC | Moderator (MediaTek) | imported from 3GU |
R1‑2101999 | Summary#3 of AI 8.15.2 Enhancements to time and frequency synchronization | Moderator (MediaTek) | imported from 3GU |
R1‑2102000 | CR on Default TCI state of Scheme 3 and Scheme 4 | Moderator (OPPO), ZTE | imported from 3GU |
R1‑2102001 | CR on DMRS | Moderator (OPPO), ZTE | imported from 3GU |
R1‑2102002 | CR on HARQ-ACK | Moderator (OPPO), vivo, CATT | imported from 3GU |
R1‑2102003 | CR on multi-TRP | Moderator (OPPO), LG Electronics, CATT, Intel | imported from 3GU |
R1‑2102004 | CR on PDSCH QCL | Moderator (OPPO), Apple | imported from 3GU |
R1‑2102005 | Summary on [104-e-NR-TEI-01] | Moderator (NTT DOCOMO, INC.) | imported from 3GU |
R1‑2102006 | Updated RAN1 UE features list for Rel-16 NR after RAN1#104-e | Moderators (AT&T, NTT DOCOMO, INC.) | imported from 3GU |
R1‑2102007 | LS on updated Rel-16 RAN1 UE features lists for NR after RAN1#104-e | RAN1, AT&T, NTT DOCOMO, INC. | imported from 3GU |
R1‑2102008 | DRAFT LS on Agreements Pertaining to L1/L2-Centric Inter-Cell Mobility | Samsung | imported from 3GU |
R1‑2102009 | Correction on DM-RS presence with PDSCH mapping type B | Moderator (Lenovo) | imported from 3GU |
R1‑2102010 | Correction on search space set group switching without channel occupancy duration field | Moderator (Lenovo) | imported from 3GU |
R1‑2102011 | Reply LS on measuring CSI-RS during SCell activation | RAN1, Lenovo | imported from 3GU |
R1‑2102012 | Summary of [104-e-NR-eMIMO-02] Email Discussion | Moderator (OPPO) | imported from 3GU |
R1‑2102013 | Summary of [104-e-NR-eMIMO-03] Email Discussion | Moderator (OPPO) | imported from 3GU |
R1‑2102014 | Summary of [104-e-NR-eMIMO-04] Email Discussion | Moderator (OPPO) | imported from 3GU |
R1‑2102015 | Reply LS on TCI state indication at Direct SCell activation | RAN1, MediaTek | imported from 3GU |
R1‑2102016 | Discussion summary#2 of [104-e-NR-52-71GHz-04] | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2102017 | Reply LS on per-table MCS range for mode-2 | RAN1, OPPO | imported from 3GU |
R1‑2102018 | Summary#2 of Email discussion [104-e-NR-DSS-01] | Moderator (Ericsson) | imported from 3GU |
R1‑2102019 | Feature lead summary#3 on timing relationship enhancements | Moderator (Ericsson) | imported from 3GU |
R1‑2102020 | CR on L1-SINR based beam measurement | Moderator (Apple), CATT | imported from 3GU |
R1‑2102021 | Corrections on Scell BFR in Rel-16 | Moderator (Apple), Huawei, HiSilicon | imported from 3GU |
R1‑2102022 | Summary of [104-e-NR-eMIMO-01] Maintenance and TPs for Multi-beam | Moderator (Apple) | imported from 3GU |
R1‑2102023 | First Set of Agreed TPs for support of 1024QAM in NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2102024 | Summary of [104-e-NR-R17-SL-LS-01] regarding potential reply to LS in R1-2100021 | Moderator (ZTE) | imported from 3GU |
R1‑2102025 | Summary of [104-e-NR-7.1CRs-16] Draft CR for Msg3 retransmission power control for Rel-15 | Moderator (vivo) | imported from 3GU |
R1‑2102026 | Summary#2 of E-mail Discussion [104-e-NR-Pos-02] | Moderator (Ericsson) | imported from 3GU |
R1‑2102027 | FL summary #2 for AI 8.5.3 Accuracy improvements for DL-AoD positioning solutions | Moderator (Ericsson) | imported from 3GU |
R1‑2102028 | FL Summary#4 on enhancements on UL time and frequency synchronization for NR NTN | Moderator (Thales) | imported from 3GU |
R1‑2102029 | Final Summary of Rel-16 UE power saving | Moderator (CATT) | imported from 3GU |
R1‑2102030 | Feature lead summary #2 on 104-e-LTE-Rel17_NB_IoT_eMTC-01 | Moderator (Huawei) | imported from 3GU |
R1‑2102031 | Summary #3 of [104-e-NR-eIAB-02] on other enhancements for simultaneous operation of IAB-node’s child and parent links | Moderator (Qualcomm) | imported from 3GU |
R1‑2102032 | Summary#8 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2102033 | Summary #2 of 8.4.4 Other Aspects of NR-NTN | Moderator (OPPO) | imported from 3GU |
R1‑2102034 | Reply LS on SL switching priority | RAN1, Xiaomi | imported from 3GU |
R1‑2102035 | FL summary#3 of accuracy improvements by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | Moderator (CATT) | imported from 3GU |
R1‑2102036 | Feature Lead Summary #3 for NR Positioning UL-AoA Enhancements | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102037 | FL summary for PUR email [104-e-LTE-eMTC5-01] | Moderator (Sierra Wireless) | imported from 3GU |
R1‑2102038 | PUR correction on PUSCH Repetition Adjustment | Moderator (Sierra Wireless), Ericsson, Huawei, HiSilicon | imported from 3GU |
R1‑2102039 | PUR correction on PUSCH Repetition Adjustment and Zero Padding Procedures | Moderator (Sierra Wireless), Ericsson, Huawei, HiSilicon | imported from 3GU |
R1‑2102040 | CR on usage of subCarrierSpacingCommon for unlicensed | Moderator (Qualcomm), Samsung | imported from 3GU |
R1‑2102041 | CR on description of FDRA field size in DCI 0_0 | Moderator (Qualcomm), Sharp, Ericsson | imported from 3GU |
R1‑2102042 | CR on description of FDRA field size in DCI 0_1 | Moderator (Qualcomm), Sharp, Ericsson | imported from 3GU |
R1‑2102043 | Feature lead summary#1 for Physical layer structure for sidelink | Moderator (Samsung) | imported from 3GU |
R1‑2102044 | Discussion for [104-e-NR-5G_V2X-01] SL max data rate | Moderator (Samsung) | imported from 3GU |
R1‑2102045 | [Draft] LS on maximum data rate for NR sidelink | Samsung | imported from 3GU |
R1‑2102046 | Feature Lead Summary #4 for NR Positioning UL-AoA Enhancements | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102047 | Summary of email discussion/approval [104-e-NR-UEFeatures-MobEnh-01] | Moderator (AT&T) | imported from 3GU |
R1‑2102048 | Summary of email discussion/approval [104-e-NR-UEFeatures-eMIMO-01] | Moderator (AT&T) | imported from 3GU |
R1‑2102049 | Summary of email discussion/approval [104-e-NR-UEFeatures-eMIMO-02] | Moderator (AT&T) | imported from 3GU |
R1‑2102050 | Summary of email discussion/approval [104-e-NR-UEFeatures-eMIMO-03] | Moderator (AT&T) | imported from 3GU |
R1‑2102051 | Summary of email discussion/approval [104-e-NR-UEFeatures-eMIMO-04] | Moderator (AT&T) | imported from 3GU |
R1‑2102052 | Session Notes of AI 7.2.11 | Ad-Hoc Chair (AT&T) | imported from 3GU |
R1‑2102053 | Summary of [104-e-NR-7.1CRs-12] Discussion on CSI-RS ambiguities | Moderator (Qualcomm) | imported from 3GU |
R1‑2102054 | Moderator summary#5 for multi-beam enhancement (round 3) | Moderator (Samsung) | imported from 3GU |
R1‑2102055 | Summary#3 of AI 8.4.3 for HARQ in NTN | Moderator (ZTE) | imported from 3GU |
R1‑2102056 | Summary#2 of AI: 8.1.2.4 Enhancements on HST-SFN deployment | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102057 | CR to TS 38.213: Correction on uplink Tx switching | Moderator (China Telecom), Huawei,HiSilicon | imported from 3GU |
R1‑2102058 | LS on uplink Tx switching | RAN1, China Telecom | imported from 3GU |
R1‑2102059 | Summary#3 for introduction of 1024QAM for NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2102060 | Summary #3 of Multi-TRP for PUCCH and PUSCH | Moderator (Nokia) | imported from 3GU |
R1‑2102061 | Summary of CSI enhancements for MTRP and FDD (Round 3) | Moderator (Huawei) | imported from 3GU |
R1‑2102062 | Summary of CSI enhancements for MTRP and FDD (Round 4) | Moderator (Huawei) | imported from 3GU |
R1‑2102063 | void | MCC ETSI | imported from 3GU |
R1‑2102064 | Summary#4 - URLLC/IIoT operation on Unlicensed Band | Moderator (Ericsson) | imported from 3GU |
R1‑2102065 | Correction on determination of number of scheduled TB for SC-MTCH | Moderator (ZTE), Sanechips, Nokia, Ericsson, Lenovo, Motorola Mobility | imported from 3GU |
R1‑2102066 | Summary of email discussion [104-e-LTE-NB_IoTenh3-02] | Moderator (ZTE) | imported from 3GU |
R1‑2102067 | Feature lead summary#4 on RAN basic functions for broadcast/multicast for UEs in RRC_IDLE/ RRC_INACTIVE states | Moderator (BBC) | imported from 3GU |
R1‑2102068 | Feature lead summary#5 on RAN basic functions for broadcast/multicast for UEs in RRC_IDLE/ RRC_INACTIVE states | Moderator (BBC) | imported from 3GU |
R1‑2102069 | Corrections related to prioritization between uplink and sidelink | Moderator (LG Electroincs), ZTE, Sanechips, NTT DOCOMO, Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑2102070 | Corrections related to the sidelink resource reservation period | Moderator (LG Electroincs) | imported from 3GU |
R1‑2102071 | LS to capture Text Proposal for TR 38.857 | RAN2, Ericsson | imported from 3GU |
R1‑2102072 | Discussion summary #2 of [104-e-NR-52-71GHz-05] | Moderator (vivo) | imported from 3GU |
R1‑2102073 | [Draft] LS on beam switching gap for 60 GHz band | Intel Corporation | imported from 3GU |
R1‑2102074 | Reply LS on AN-PDB and PER targets for satellite access | RAN1, Qualcomm | imported from 3GU |
R1‑2102075 | [DRAFT] LS reply on physical layer aspects of small data transmission | ZTE | imported from 3GU |
R1‑2102076 | Summary on the physical layer aspects of small data transmission | Moderator (ZTE) | imported from 3GU |
R1‑2102077 | Views on XR traffic models | Apple | imported from 3GU |
R1‑2102078 | Feature lead summary#4 on timing relationship enhancements | Moderator (Ericsson) | imported from 3GU |
R1‑2102079 | FL summary #4 on SRS enhancements | Moderator (ZTE) | imported from 3GU |
R1‑2102080 | Summary #4 of PDSCH/PUSCH enhancements (Scheduling/HARQ) | Moderator (LG Electronics) | imported from 3GU |
R1‑2102081 | Email discussion summary#3 for channel access for 52.6-71GHz | Moderator (Qualcomm) | imported from 3GU |
R1‑2102082 | FL summary#4 on improving reliability for MBS for RRC_CONNECTED UEs | Moderator (Huawei) | imported from 3GU |
R1‑2102083 | Feature lead summary#3 on multi-cell scheduling via a single DCI | Moderator (Lenovo) | imported from 3GU |
R1‑2102084 | Feature lead summary#3 on Enhancements on Multi-TRP inter-cell operation | Moderator (vivo) | imported from 3GU |
R1‑2102085 | LS on Interpretation of UE Features in Case of Cross-Carrier Operation | RAN1, ZTE | imported from 3GU |
R1‑2102086 | Summary of [104-e-NR-7.1CRs-02] on Ambiguity Issues for UE Features with Cross-Carrier Operation | Moderator (ZTE) | imported from 3GU |
R1‑2102087 | Second Set of Agreed TPs for support of 1024QAM in NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2102088 | LS on Introduction of DL 1024QAM for NR | RAN1, Ericsson | imported from 3GU |
R1‑2102089 | Final Summary for introduction of 1024QAM for NR DL | Moderator(Ericsson) | imported from 3GU |
R1‑2102090 | [Draft] LS on the maximum/minimum channel bandwidth and channelization for NR operation in 52.6 to 71 GHz | vivo | imported from 3GU |
R1‑2102091 | Outcome of email discussion [104-e-NR-5G_V2X-04] | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102092 | Correction to pre-emption condition for Mode-2 resource allocation | Moderator (Intel Corporation), Ericsson, Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, OPPO | imported from 3GU |
R1‑2102093 | FL summary #3 for AI 8.5.3 Accuracy improvements for DL-AoD positioning solutions | Moderator (Ericsson) | imported from 3GU |
R1‑2102094 | [Draft] LS on Half-duplex FDD switching time for RedCap UE | Ericsson | imported from 3GU |
R1‑2102095 | Determination of indexes for slots for S-SS/PSBCH block transmission(s) | Moderator (CATT), ZTE, Sanechips, Qualcomm | imported from 3GU |
R1‑2102096 | Restrictions of the slots for S-SSB transmission/reception | Moderator (CATT), NTT DOCOMO, Huawei, HiSilicon, vivo, OPPO, MediaTek, ZTE, Sanechips | imported from 3GU |
R1‑2102097 | Clarification on Sidelink SSID | Moderator (CATT), Ericsson | imported from 3GU |
R1‑2102098 | Correction on Sidelink Broadcast channel | Moderator (CATT), Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑2102099 | Summary#9 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2102100 | Discussion summary#3 of [104-e-NR-52-71GHz-04] | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2102101 | Summary#3 of Email discussion [104-e-NR-DSS-01] | Moderator (Ericsson) | imported from 3GU |
R1‑2102102 | Summary#4 of AI 8.15.1 Scenarios applicable to NB-IoT/eMTC | Moderator (MediaTek) | imported from 3GU |
R1‑2102103 | Summary#4 of AI 8.15.2 Enhancements to time and frequency synchronization | Moderator (MediaTek) | imported from 3GU |
R1‑2102104 | CR on Timing for secondary cell activation / deactivation with sub-slot PUCCH | Moderator (OPPO) | imported from 3GU |
R1‑2102105 | CR on number of PUCCHs with HARQ-ACK in a slot | Moderator (OPPO) | imported from 3GU |
R1‑2102106 | Summary of email discussion [104-e-NR-L1enh-URLLC-03] on PUSCH enhancements for NR eURLLC | Moderator (Apple Inc.) | imported from 3GU |
R1‑2102107 | Correction on Part 2 CSI dropping for UCI multiplexing on PUSCH repetition Type B | Moderator (Apple Inc.) | imported from 3GU |
R1‑2102108 | Feature lead summary#3 on Resource allocation for NR sidelink Mode 1 | Moderator (Ericsson) | imported from 3GU |
R1‑2102109 | PUR correction on PUSCH Repetition Adjustment | Moderator (Sierra Wireless), Ericsson, Huawei, HiSilicon, ZTE | imported from 3GU |
R1‑2102110 | PUR correction on PUSCH Repetition Adjustment and Zero Padding Procedures | Moderator (Sierra Wireless), Ericsson, Huawei, HiSilicon, ZTE | imported from 3GU |
R1‑2102111 | FL Summary#3 for Enhancements for PUCCH formats 0/1/4 | Moderator (Ericsson) | imported from 3GU |
R1‑2102112 | Moderator summary#6 for multi-beam enhancement (round 3B) | Moderator (Samsung) | imported from 3GU |
R1‑2102113 | FL Summary on Enhancements on PUSCH repetition type A | Moderator (Sharp) | imported from 3GU |
R1‑2102114 | [Draft] LS on SL HARQ-ACK reporting to the gNB | Ericsson | imported from 3GU |
R1‑2102115 | [Draft] Correction of SL HARQ-ACK information reporting to the gNB in Mode 1 | Moderator (Ericsson), NTT DOCOMO, OPPO, Ericsson | imported from 3GU |
R1‑2102116 | Correction on LBT for consecutive UL transmission triggered by DL assingments | Moderator (Nokia), ETRI, WILUS, Huawei, HiSilicon | imported from 3GU |
R1‑2102117 | Correction on LBT Type and CP Extension Indication for Semi-Static Channel Occupancy | Moderator (Nokia), Ericsson, Intel | imported from 3GU |
R1‑2102118 | Correction on Channel Occupancy Time for Semi-Static Channel Access | Moderator (Nokia), Sharp | imported from 3GU |
R1‑2102119 | Correction on Channel Access for Multi-Channel transmission | Moderator (Nokia), LGE, Huawei, HiSilicon | imported from 3GU |
R1‑2102120 | Correction on LBT Type and CP Extension Indication for Semi-Static Channel Occupancy | Moderator (Nokia), Ericsson, Intel | imported from 3GU |
R1‑2102121 | Correction on LBT Type and CP Extension Indication for Semi-Static Channel Occupancy in RAR | Moderator (Nokia), Ericsson, Intel | imported from 3GU |
R1‑2102122 | FL summary#4 of accuracy improvements by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | Moderator (CATT) | imported from 3GU |
R1‑2102123 | Summary of email discussion [104-e-NR-7.1CRs-05]: clarification of cancellation due to SFI, PSDCH, or CSI-RS | Moderator (Qualcomm) | imported from 3GU |
R1‑2102124 | Feature Lead Summary [104-e-LTE-Rel17_NB_IoT_eMTC-03] 2nd check point | Moderator (Sony) | imported from 3GU |
R1‑2102125 | LS reply on physical layer aspects of small data transmission | RAN1, ZTE | imported from 3GU |
R1‑2102126 | Correction on uplink Tx switching | Moderator (China Telecom), ZTE, CATT | imported from 3GU |
R1‑2102127 | FL Summary#4 for Enhancements for PUCCH formats 0/1/4 | Moderator (Ericsson) | imported from 3GU |
R1‑2102128 | LS on the maximum/minimum channel bandwidth and channelization for NR operation in 52.6 to 71 GHz | RAN1, vivo | imported from 3GU |
R1‑2102129 | Feature lead summary #2 on AI 7.2.4 Sidelink synchronization mechanism | Moderator (CATT) | imported from 3GU |
R1‑2102130 | FL summary #2 on other issues in NR Sidelink enhancement | Moderator (CATT) | imported from 3GU |
R1‑2102131 | Feature lead summary #4 on CSI feedback enhancements for enhanced URLLC/IIoT | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2102132 | Summary#4 for enhancements on HARQ | Moderator (Samsung) | imported from 3GU |
R1‑2102133 | Feature Lead Summary#2 on Channel Access Procedures for NR-U | Moderator (Nokia) | imported from 3GU |
R1‑2102134 | FL summary#5 on improving reliability for MBS for RRC_CONNECTED UEs | Moderator (Huawei) | imported from 3GU |
R1‑2102135 | Correction of SL HARQ-ACK information reporting to the gNB in Mode 1 | Moderator (Ericsson), NTT DOCOMO, OPPO, Ericsson | imported from 3GU |
R1‑2102136 | Reply LS on Paging Enhancement | RAN1, MediaTek | imported from 3GU |
R1‑2102137 | LS on maximum data rate for NR sidelink | RAN1, Samsung | imported from 3GU |
R1‑2102138 | Feature lead summary#4 on multi-cell scheduling via a single DCI | Moderator (Lenovo) | imported from 3GU |
R1‑2102139 | Summary#3 of AI: 8.1.2.4 Enhancements on HST-SFN deployment | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102140 | FL Summary#5 on enhancements on UL time and frequency synchronization for NR NTN | Moderator (Thales) | imported from 3GU |
R1‑2102141 | Summary #3 of 8.4.4 Other Aspects of NR-NTN | Moderator (OPPO) | imported from 3GU |
R1‑2102142 | Feature lead summary#2 for [104-e-NR-52-71GHz-02] on PDCCH monitoring enhancements | Moderator (Lenovo) | imported from 3GU |
R1‑2102143 | Summary#4 of AI 8.4.3 for HARQ in NTN | Moderator (ZTE) | imported from 3GU |
R1‑2102144 | Discussion summary#4 of [104-e-NR-52-71GHz-04] | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2102145 | FL summary #5 for UE complexity reduction for RedCap | Moderator (Ericsson) | imported from 3GU |
R1‑2102146 | LS on Half-duplex FDD switching time for RedCap UE | RAN1, Ericsson | imported from 3GU |
R1‑2102147 | LS to capture Text Proposal for TR 38.857 | RAN2, Ericsson | imported from 3GU |
R1‑2102148 | Reply LS on Rel-16 NR positioning Correction | RAN2, Huawei | imported from 3GU |
R1‑2102149 | [104-e-NR-TxSwitching-01] Summary of email discussion on maintenance of Rel-16 uplink Tx switching | Moderator (China Telecom) | imported from 3GU |
R1‑2102150 | [Draft] Reply LS on overlapped data and SR are of equal L1 priority | vivo | imported from 3GU |
R1‑2102151 | Email discussion summary on [104-e-NR-L1enh-URLLC-06] for intra-UE prioritization | Moderator (vivo) | imported from 3GU |
R1‑2102152 | LS on numerology for active DL and UL BWPs | RAN1, MediaTek | imported from 3GU |
R1‑2102153 | Moderator summary on beam management for M-TRP (round 2) | Moderator (CATT) | imported from 3GU |
R1‑2102154 | Moderator summary on [104-e-NR-7.1CRs-09] Correction on UE sounding procedure (round 2) | Moderator (CATT) | imported from 3GU |
R1‑2102155 | CR to 38.213 on PRACH handling for NR-DC power control | Moderator (Ericsson), MediaTek, Qualcomm | imported from 3GU |
R1‑2102156 | CR to 38.213 on HARQ-ACK priority determination for SCell dormancy indication | Moderator (Ericsson), ZTE | imported from 3GU |
R1‑2102157 | Correction on HARQ process number for SPS validation when multi-TB is configured | Moderator (Ericsson), ZTE, sanechips, Ericsson, Lenovo, Motorola Mobility | imported from 3GU |
R1‑2102158 | CR for the configuration of semi-persistent SRS | Moderator (Ericsson), ZTE | imported from 3GU |
R1‑2102159 | CR for the configuration of DL-PRS as the spatial relation of periodic and semi-persistent positioning SRS | Moderator (Ericsson), vivo | imported from 3GU |
R1‑2102160 | CR for the configuration of SRS for positioning in SRS carrier switching | Moderator (Ericsson), Huawei, HiSilicon | imported from 3GU |
R1‑2102161 | [104-e-NR-CovEnh-03] Summary of email discussion on joint channel estimation for PUSCH | Moderator (China Telecom) | imported from 3GU |
R1‑2102162 | CR on DL PRS resource indication in activation command for semi-persistent SRS for positioning and amount of DL PRS resource sets per TRP | Moderator (Intel Corporation), Nokia, Nokia Shanghai Bell, CATT | imported from 3GU |
R1‑2102163 | CR on timestamp reference in NR positioning measurement report | Moderator(Intel Corporation), vivo | imported from 3GU |
R1‑2102164 | CR on measurement gap configuration for NR positioning | Moderator (Intel Corporation), vivo, Huawei | imported from 3GU |
R1‑2102165 | Draft LS on Mode 2 enhancements in NR sidelink | LG Electronics | imported from 3GU |
R1‑2102166 | Detailed observations from evaluation results | Moderator (LG Electronics) | imported from 3GU |
R1‑2102167 | Feature lead summary for AI 8.11.1.2 Feasibility and benefits for mode 2 enhancements | Moderator (LG Electronics) | imported from 3GU |
R1‑2102168 | LS on Mode 2 enhancements in NR sidelink | RAN1, LG Electronics | imported from 3GU |
R1‑2102169 | Moderator summary of [104-e-NR-7.1CRs-17] 38.213 CR on DCI ordering in a search space | Moderator (Nokia) | imported from 3GU |
R1‑2102170 | 38.213 CR on DCI ordering in a search space set | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑2102171 | Summary#10 on mechanisms to support group scheduling for RRC_CONNECTED UEs for NR MBS | Moderator (CMCC) | imported from 3GU |
R1‑2102172 | Summary #4 of [104-e-NR-eIAB-02] on other enhancements for simultaneous operation of IAB-node’s child and parent links | Moderator (Qualcomm) | imported from 3GU |
R1‑2102173 | Summary#5 - URLLC/IIoT operation on Unlicensed Band | Moderator (Ericsson) | imported from 3GU |
R1‑2102174 | FL summary#3 of AI 8.15.3 | Moderator (Sony) | imported from 3GU |
R1‑2102175 | Summary#6 - URLLC/IIoT operation on Unlicensed Band | Moderator (Ericsson) | imported from 3GU |
R1‑2102176 | LS on SL HARQ-ACK reporting to the gNB | RAN1, Ericsson | imported from 3GU |
R1‑2102177 | Text proposal for TR 36.763 for RAN1#104e Agreements | Rapporteur (MediaTek) | imported from 3GU |
R1‑2102178 | 38.214 CR on CSI request constraint per slot | MediaTek Inc. | imported from 3GU |
R1‑2102179 | Summary for [104-e-NR-7.1CRs-11] Clarification on CSI request constraint per slot | Moderator (MediaTek) | imported from 3GU |
R1‑2102180 | Feature lead summary#6 on RAN basic functions for broadcast/multicast for UEs in RRC_IDLE/ RRC_INACTIVE states | Moderator (BBC) | imported from 3GU |
R1‑2102181 | FL summary #4 for AI 8.5.3 Accuracy improvements for DL-AoD positioning solutions | Moderator (Ericsson) | imported from 3GU |
R1‑2102182 | FL Summary#6 on enhancements on UL time and frequency synchronization for NR NTN | Moderator (Thales) | imported from 3GU |
R1‑2102183 | Session notes for 6.1 (Maintenance of E-UTRA Releases 8-15) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102184 | Session notes for 6.2.1 (Maintenance of Additional MTC Enhancements) and 6.2.2 (Maintenance of Additional Enhancements for NB-IoT) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102185 | Session notes for 7.1 (Maintenance of Release 15 NR) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102186 | Session notes for 7.2.2 (Maintenance of NR-based Access to Unlicensed Spectrum) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102187 | Session notes for 7.2.5 (Maintenance of Physical Layer Enhancements for NR URLLC/IIoT) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102188 | Session notes for 7.2.6 (Maintenance of Enhancements on MIMO for NR) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102189 | Session notes for 7.2.8 (Maintenance of NR positioning support) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102190 | Session notes for 7.2.10 (Maintenance of Multi-RAT Dual-Connectivity and Carrier Aggregation enhancements) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102191 | Session notes for 8.1 (Further enhancements on MIMO for NR) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102192 | Session notes for 8.2 (Study on supporting NR from 52.6 GHz to 71 GHz) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102193 | Session notes for 8.4 (Solutions for NR to support non-terrestrial networks (NTN)) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102194 | Session notes for 8.5 (Study on NR Positioning Enhancements) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102195 | Session notes for 8.9 (Rel-17 enhancements for NB-IoT and LTE-MTC) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102196 | Session notes for 8.10 (Enhancements to Integrated Access and Backhaul) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102197 | Session notes for 8.12 (NR Multicast and Broadcast Services) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102198 | Sesson notes for 8.13 (NR Dynamic spectrum sharing (DSS)) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102199 | Session notes for 8.15 (Study on NB-IoT/eMTC support for Non-Terrestrial Network) | Ad-Hoc Chair (Ericsson) | imported from 3GU |
R1‑2102200 | Session notes for 8.16 (Introduction of DL 1024QAM for NR FR1) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102201 | [DRAFT] LS on UE/TRP Tx/Rx Timing Errors | CATT | imported from 3GU |
R1‑2102202 | LS on beam switching gap for 60 GHz band | RAN1, Intel Corporation | imported from 3GU |
R1‑2102203 | Correction on multicast gap in multi-TB scheduling in LTE-MTC | Moderator (Ericsson), Lenovo, Motorola mobility, Qualcomm, Ericsson, ZTE | imported from 3GU |
R1‑2102204 | FL summary#5 of accuracy improvements by mitigating UE Rx/Tx and/or gNB Rx/Tx timing delays | Moderator (CATT) | imported from 3GU |
R1‑2102205 | CR for the configuration of semi-persistent SRS | Moderator (Ericsson), ZTE | imported from 3GU |
R1‑2102206 | CR for the configuration of DL-PRS as the spatial relation of periodic and semi-persistent positioning SRS | Moderator (Ericsson), vivo | imported from 3GU |
R1‑2102207 | CR for the configuration of SRS for positioning in SRS carrier switching | Moderator (Ericsson), Huawei, HiSilicon | imported from 3GU |
R1‑2102208 | Moderator summary of [104-e-AI5-LS-02] for the reply LS to R1-200023 | Moderator (Nokia) | imported from 3GU |
R1‑2102209 | LS on Agreements Pertaining to L1/L2-Centric Inter-Cell Mobility | RAN1, Samsung | imported from 3GU |
R1‑2102210 | Correction on transmission scheme for NPDSCH configured by PUR-RNTI | Moderator (Huawei), Huawei, Hisilicon, ZTE, Sanechips, Ericsson | imported from 3GU |
R1‑2102211 | PUR correction on DCI size alignment | Moderator (Huawei), Huawei, Hisilicon, ZTE, Sanechips, Ericsson | imported from 3GU |
R1‑2102212 | PUR correction on parameter name for DL carrier | Moderator (Huawei), Huawei, Hisilicon, ZTE, Sanechips, Ericsson | imported from 3GU |
R1‑2102213 | Feature lead summary #1 on [104-e-LTE-NB_IoTenh3-01] | Moderator (Huawei) | imported from 3GU |
R1‑2102214 | Summary#4 of AI: 8.1.2.4 Enhancements on HST-SFN deployment | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102215 | FL Summary#7 on enhancements on UL time and frequency synchronization for NR NTN | Moderator (Thales) | imported from 3GU |
R1‑2102216 | Final summary of [104-e-NR-L1enh-URLLC-05] | Moderator (LG Electronics) | imported from 3GU |
R1‑2102217 | [104-e-NR-MRDC-CA-02] Email discussion/approval on cross-carrier triggering scheduling and A-CSI RS triggering, and unaligned CA | Moderator (Nokia) | imported from 3GU |
R1‑2102218 | Additional timing delay for applying QCL relation on the PDSCH with cross-carrier scheduling with different SCS | Moderator (Nokia), MediaTek, Qualcomm | imported from 3GU |
R1‑2102219 | FL summary for Multi-TB issues for Rel-16 LTE-MTC | Moderator (Ericsson) | imported from 3GU |
R1‑2102220 | RAN1 agreements for Rel-17 NR RedCap | Rapporteur (Ericsson) | imported from 3GU |
R1‑2102221 | Summary #1 of email discussion [104-e-NR-L1enh-URLLC-01] on remaining issues on PDCCH enhancements | Moderator (Huawei) | imported from 3GU |
R1‑2102222 | Correction on dci-FormatsExt in section 10.1 in TS 38.213 | Moderator (Huawei), Sharp | imported from 3GU |
R1‑2102223 | Correction on PDSCH resource mapping with RE symbol level granularity | Moderator (Huawei), Sharp | imported from 3GU |
R1‑2102224 | Draft LS on UE transmit timing error | Huawei | imported from 3GU |
R1‑2102225 | Summary of email discussion [104-e-NR-7.1CRs-03] on the clarification of PUSCH scheduling restriction | Moderator (Apple Inc.) | imported from 3GU |
R1‑2102226 | Feature lead summary on support of Type A PUSCH repetitions for Msg3 | Moderator (ZTE) | imported from 3GU |
R1‑2102227 | Summary of [104-e-NR-L1enh-URLLC-04] on remaining issues on Scheduling & HARQ enhancements | Moderator (Qualcomm) | imported from 3GU |
R1‑2102228 | Active time duration of NZP CSI-RS resource | Qualcomm | imported from 3GU |
R1‑2102229 | Resolving collision with semi-static DL and SSB symbols | Qualcomm | imported from 3GU |
R1‑2102230 | Correction on PUCCH resource determination in section 9.2.1 in TS 38.213 | Moderator (LG Electronics), Samsung | imported from 3GU |
R1‑2102231 | TR36.763 Study on Narrow-Band Internet of Things (NB-IoT) / enhanced Machine Type Communication (eMTC) support for Non-Terrestrial Networks (NTN) | Rapporteur (MediaTek) | imported from 3GU |
R1‑2102232 | Alignment of notation | Ericsson | imported from 3GU |
R1‑2102233 | Alignment CR for TS 38.212 | Huawei | imported from 3GU |
R1‑2102234 | Editorial corrections for 38.213 | Samsung | imported from 3GU |
R1‑2102235 | Editorial corrections for 38.214 | Nokia | imported from 3GU |
R1‑2102236 | Summary#4 of Email discussion [104-e-NR-DSS-01] | Moderator (Ericsson) | imported from 3GU |
R1‑2102237 | Discussion summary #3 of [104-e-NR-52-71GHz-05] | Moderator (vivo) | imported from 3GU |
R1‑2102238 | Summary #5 of email discussion on initial access aspect of NR extension up to 71 GHz | Moderator (Intel Corporation) | imported from 3GU |
R1‑2102239 | FL summary #5 for AI 8.5.3 Accuracy improvements for DL-AoD positioning solutions | Moderator (Ericsson) | imported from 3GU |
R1‑2102240 | Summary of Email discussion [104-e-NR-MRDC-CA-01] | Moderator (Ericsson) | imported from 3GU |
R1‑2102241 | FL summary of TB processing over multi-slot PUSCH (AI 8.8.1.2) | Moderator (Nokia) | imported from 3GU |
R1‑2102242 | Feature lead summary#3 for [104-e-NR-52-71GHz-02] on PDCCH monitoring enhancements | Moderator (Lenovo) | imported from 3GU |
R1‑2102243 | Discussion summary#5 of [104-e-NR-52-71GHz-04] | Moderator (InterDigital, Inc.) | imported from 3GU |
R1‑2102244 | Reply LS on overlapped data and SR are of equal L1 priority | RAN1, vivo | imported from 3GU |
R1‑2102245 | LS on UE transmit timing error | RAN1, Huawei | imported from 3GU |
R1‑2102246 | Summary of [104-e-NR-7.1CRs-01] Discussion on UL skipping for PUSCH for Rel-16 | Moderator (vivo) | imported from 3GU |
R1‑2102247 | DRAFT LS on TCI State Update for L1/L2-Centric Inter-Cell Mobility | Samsung | imported from 3GU |
R1‑2102248 | LS on TCI State Update for L1/L2-Centric Inter-Cell Mobility | RAN1, Samsung | imported from 3GU |
R1‑2102249 | LS on UL skipping for PUSCH in Rel-16 | RAN1, vivo | imported from 3GU |
R1‑2102250 | Session notes for 8.1 (Further enhancements on MIMO for NR) | Ad-hoc Chair (Samsung) | imported from 3GU |
R1‑2102251 | CR on DL PRS resource indication in activation command for semi-persistent SRS for positioning and amount of DL PRS resource sets per TRP | Moderator (Intel Corporation), Nokia, Nokia Shanghai Bell, CATT | imported from 3GU |
R1‑2102252 | CR on timestamp reference in NR positioning measurement report | Moderator(Intel Corporation), vivo | imported from 3GU |
R1‑2102253 | CR on measurement gap configuration for NR positioning | Moderator (Intel Corporation), vivo, Huawei | imported from 3GU |
R1‑2102254 | Email discussion/approval for traffic model and capacity KPI for XR | Moderator (Qualcomm) | imported from 3GU |
R1‑2102255 | Text proposal for TR 36.763 for RAN1#104e Agreements | Rapporteur (MediaTek) | imported from 3GU |
R1‑2102256 | TR36.763 Study on Narrow-Band Internet of Things (NB-IoT) / enhanced Machine Type Communication (eMTC) support for Non-Terrestrial Networks (NTN) | Rapporteur (MediaTek) | imported from 3GU |
R1‑2102257 | Moderator summary for [104-e-Post-R17-eMIMO-01] | Moderator (Samsung) | imported from 3GU |
R1‑2102258 | Text proposal for TR 36.763 for RAN1#103e Agreements | Rapporteur (MediaTek) | imported from 3GU |
R1‑2102259 | TR 38.808 v101: Study on supporting NR from 52.6 GHz to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2102260 | TR 38.808 v110: Study on supporting NR from 52.6 GHz to 71 GHz | Intel Corporation | imported from 3GU |
R1‑2102261 | TR 38.857 v101: Study on NR positioning enhancements | Ericsson | imported from 3GU |
R1‑2102262 | TR 38.857 v110: Study on NR positioning enhancements | Ericsson | imported from 3GU |
R1‑2102263 | LS on NTN UL time and frequency synchronization requirements | RAN1, Thales | imported from 3GU |
R1‑2102264 | Moderator summary for [104-e-Post-R17-NTN-01] Email discussion on LS to RAN4 on NTN UL time and frequency synchronization requirements | Moderator (Thales) | imported from 3GU |
R1‑2102265 | Summary#5 of AI 8.15.1 Scenarios applicable to NB-IoT/eMTC | Moderator (MediaTek) | imported from 3GU |
R1‑2102266 | Summary#5 of AI 8.15.2 Enhancements to time and frequency synchronization | Moderator (MediaTek) | imported from 3GU |
R1‑2102267 | TR 38.857 v110: Study on NR positioning enhancements | Ericsson | imported from 3GU |
R1‑2102268 | Feature lead summary for AI 8.11.1.2 Feasibility and benefits for mode 2 enhancements | Moderator (LG Electronics) | imported from 3GU |
R1‑2102269 | TR 38.875 v1.1.0: Study on support of reduced capability NR devices; for information | Ericsson | imported from 3GU |
R1‑2102270 | TR 38.875 v1.1.0: Study on support of reduced capability NR devices; for information | Ericsson | imported from 3GU |
R1‑2102271 | Response LS to RAN1 on the resource reservation period | RAN2, LG Electronics | imported from 3GU |
R1‑2102272 | TR36.763 Study on Narrow-Band Internet of Things (NB-IoT) / enhanced Machine Type Communication (eMTC) support for Non-Terrestrial Networks (NTN) | Rapporteur (MediaTek) | imported from 3GU |
page generated from database: 2024-04-22 07:58:53