3GPP TDocs (written contributions) at meeting
Meeting: R4-92 - 2019-10-14 to 2019-10-18, Chongqing
meeting id: R4-92 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1910744 | TP for TR 36.716-03-01: LTE CA_25-25-26-41 | SPRINT Corporation | imported from 3GU |
R4‑1910745 | TX diversity clarification for Rel-15 | Qualcomm Incorporated | imported from 3GU |
R4‑1910746 | CR to enable tx diversity | Qualcomm Incorporated | imported from 3GU |
R4‑1910747 | LS on tx diverity for rel-15 | Qualcomm Incorporated | imported from 3GU |
R4‑1910748 | UL MIMO TX EVM test condition changes | Qualcomm Incorporated | imported from 3GU |
R4‑1910749 | CR to 38.101-1: TX EVM for UL MIMO condition change | Qualcomm Incorporated | imported from 3GU |
R4‑1910750 | Super UL modes and requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1910751 | Switching times and reference architectures | Qualcomm Incorporated | imported from 3GU |
R4‑1910752 | Reporting options toward network to improve link reliability under MPE issue | Qualcomm Incorporated | imported from 3GU |
R4‑1910753 | Receiver blocker requirements for FR2 inter-band ca | Qualcomm Incorporated | imported from 3GU |
R4‑1910754 | General spectrum emission mask for NR UE 7-24 GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1910755 | Reference architecture assumptions for inter-band CA on FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1910756 | TP for TR TR 38.820 : NR UE system noise figure proposal | Qualcomm Incorporated | imported from 3GU |
R4‑1910757 | Adding low bands to 4 Rx antenna ports support | T-Mobile USA Inc. | imported from 3GU |
R4‑1910758 | On FR2 CA fallbacks | Qualcomm Incorporated | imported from 3GU |
R4‑1910759 | Draft LS on implicit support of CA fallback configurations in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1910760 | dCR to 38.101-2: DMRS exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1910761 | dCR to 38.101-2: CA MPR correction | Qualcomm Incorporated | imported from 3GU |
R4‑1910762 | dCR to 38.101-1: DMRS Exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1910763 | DL CA BW Feature Definition | Qualcomm Incorporated | imported from 3GU |
R4‑1910764 | TP to TR: UE Architectures and UL and DL coverage spectra | Qualcomm Incorporated | imported from 3GU |
R4‑1910765 | FR2 Intra-band NC ULCA Feature Definition | Qualcomm Incorporated | imported from 3GU |
R4‑1910766 | TP to TR38.831: Emissions Requirements for FR2 NC UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1910767 | Rel. 16 FR2 Beam Correspondence | Qualcomm Incorporated | imported from 3GU |
R4‑1910768 | TR 37.825 v0.3.0 High power UE (power class 2) for EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1910769 | Proposal on release independent issue for PC2 EN-DC TDD+TDD | CMCC, CATT, ZTE, Huawei, HiSilicon, vivo, Qualcomm | imported from 3GU |
R4‑1910770 | TP for TR37.825 for release independent issue | CMCC | imported from 3GU |
R4‑1910771 | Draft CR for REL-16 TS 38.307 for PC2 EN-DC TDD+TDD | CMCC | imported from 3GU |
R4‑1910772 | Draft CR for REL-15 TS 38.307 for PC2 EN-DC TDD+TDD. | CMCC | imported from 3GU |
R4‑1910773 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.101-1 | CMCC | imported from 3GU |
R4‑1910774 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.104 | CMCC | imported from 3GU |
R4‑1910775 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.141-1 | CMCC | imported from 3GU |
R4‑1910776 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.141-2 | CMCC | imported from 3GU |
R4‑1910777 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 36.104 | CMCC | imported from 3GU |
R4‑1910778 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 36.141 | CMCC | imported from 3GU |
R4‑1910779 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.104 | CMCC | imported from 3GU |
R4‑1910780 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.141 | CMCC | imported from 3GU |
R4‑1910781 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.105 | CMCC | imported from 3GU |
R4‑1910782 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.145-1 | CMCC | imported from 3GU |
R4‑1910783 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.145-2 | CMCC | imported from 3GU |
R4‑1910784 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 25.104 | CMCC | imported from 3GU |
R4‑1910785 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 25.141 | CMCC | imported from 3GU |
R4‑1910786 | Further discussion on IAB requirement reference points | CMCC | imported from 3GU |
R4‑1910787 | Further Discussion on IAB with hybrid RF requirements at FR1 | CMCC | imported from 3GU |
R4‑1910788 | Draft CR to TS 38.104: Corrections to RE power control dynamic range | CMCC | imported from 3GU |
R4‑1910789 | Draft CR to TS 38.141-1: Corrections to BS classes and transmit configurations | CMCC | imported from 3GU |
R4‑1910790 | Draft CR to TS 38.141-2: Update to Table C.1-2 FR2 OTA transmitter tests | CMCC | imported from 3GU |
R4‑1910791 | Draft CR to TS 37.104: Correction to Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1910792 | Work plan on UE requirements to allow switching for two uplink carriers | China Telecom | imported from 3GU |
R4‑1910793 | UE requirement to allow Tx switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1910794 | LS on switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1910795 | On NR CA PDSCH normal demodulation requirements | China Telecom | imported from 3GU |
R4‑1910796 | Discussion on PMI reporting requirements for larger number of Tx ports | China Telecom | imported from 3GU |
R4‑1910797 | On PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1910798 | Ideal and impairment results for FR2 PUSCH 2T2R MCS12 | China Telecom | imported from 3GU |
R4‑1910799 | Summary of ideal and impairment results for FR2 PUSCH 2T2R MCS12 | China Telecom | imported from 3GU |
R4‑1910800 | Remaining general issues for BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1910801 | Summary of ideal and impairment results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1910802 | Draft CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1910803 | Draft CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1910804 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1910805 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1910806 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1910807 | Further discussion on handover delay for LTE_feMob | China Telecom | imported from 3GU |
R4‑1910808 | Discussion on handover delay for conditional handover | China Telecom | imported from 3GU |
R4‑1910809 | further discussion on FR1 probes layout | vivo | imported from 3GU |
R4‑1910810 | On clarification of ENDC power class in R15 | vivo | imported from 3GU |
R4‑1910811 | Draft LS on clarification of ENDC power class in R15 | vivo | imported from 3GU |
R4‑1910812 | further discussion on option3 for PC2 EN-DC (FDD+TDD) | vivo | imported from 3GU |
R4‑1910813 | TP for TR 37.815 of the solution option3 for SAR limits | vivo | imported from 3GU |
R4‑1910814 | Clarification on RSSI measurement requirement R13 | MediaTek inc. | imported from 3GU |
R4‑1910815 | UE UL timing adjustment due to Rx beam change | MediaTek inc. | imported from 3GU |
R4‑1910816 | Update requirements for UE UL Tx timing | MediaTek inc. | imported from 3GU |
R4‑1910817 | TC with monitoring PDCCH not starting from the first OFDM symbol in a slot | MediaTek inc. | imported from 3GU |
R4‑1910818 | Discussion on BWP requirements for multiple CCs | MediaTek inc. | imported from 3GU |
R4‑1910819 | Inter-frequency measurement requirement without MG | MediaTek inc. | imported from 3GU |
R4‑1910820 | Simulation results for CSI-RS measurement BW | MediaTek inc. | imported from 3GU |
R4‑1910821 | Definition of Intra and inter frequency for CSI-RS RRM | MediaTek inc. | imported from 3GU |
R4‑1910822 | Discussion on measurement capability for CSI-RS RRM | MediaTek inc. | imported from 3GU |
R4‑1910823 | Cell identification requirements for CSI-RS RRM | MediaTek inc. | imported from 3GU |
R4‑1910824 | SS-SINR measurement accuracy in HST | MediaTek inc. | imported from 3GU |
R4‑1910825 | Beam management in HST with DPS transmission | MediaTek inc. | imported from 3GU |
R4‑1910826 | Discussion on feasibility of NR HST with DPS transmission | MediaTek inc. | imported from 3GU |
R4‑1910827 | Discussion on PDSCH simulation assumptions for NR-HST UE | MediaTek inc. | imported from 3GU |
R4‑1910828 | Draft CR to TS 38.101-3 on inter-band CA, EN-DC, NE-DC and NR-DC configurations | ZTE Corporation | imported from 3GU |
R4‑1910829 | Draft CR to TS 38.101-3 on inter-band EN-DC configurations including FR2 for five bands (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1910830 | Draft CR to TS 38.101-3 on single UL allowed for inter-band CA configurations (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1910831 | Draft CR to TS 38.101-1 on A-MPR table cleanup | ZTE Corporation | imported from 3GU |
R4‑1910832 | Draft CR to TS 38.104 on corrections to channel raster entries for NR band | ZTE Corporation | imported from 3GU |
R4‑1910833 | Draft TR 38.716-02-00 on Rel-16 NR inter-band CA DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910834 | Draft TR 38.716-03-02 v0.2.0 on Rel-16 NR inter-band CA DC for 3 bands DL with 2 bands UL,clean | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1910835 | FR1 IAB class and minimum output power requirement | CMCC | imported from 3GU |
R4‑1910836 | FR1 IAB co-existence study | CMCC | imported from 3GU |
R4‑1910837 | FR1 IAB co-existence study | CMCC | imported from 3GU |
R4‑1910838 | FR1 IAB co-existence study | CMCC | imported from 3GU |
R4‑1910839 | FR1 IAB conducted requirement | CMCC | imported from 3GU |
R4‑1910840 | FR1 IAB conducted requirement | CMCC | imported from 3GU |
R4‑1910841 | FR1 IAB conducted requirement | CMCC | imported from 3GU |
R4‑1910842 | FR1 IAB conducted requirement | CMCC | imported from 3GU |
R4‑1910843 | Further consideration on power boosting | Huawei, HiSilicon, Chongqing University | imported from 3GU |
R4‑1910844 | Draft CR on TS 38.104 to support NR NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1910845 | Draft CR to TS 37.104: introduction of NB-IoT operation in NR in-band | Huawei, HiSilicon | imported from 3GU |
R4‑1910846 | BS TX impairment for 256 QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1910847 | Additional simulation results on DL 256QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1910848 | Operating band unwanted emissions for 7 to 24GHz frequency range | Huawei | imported from 3GU |
R4‑1910849 | Receiver ACS for 7 to 24GHz frequency range | Huawei | imported from 3GU |
R4‑1910850 | Channel arrangement for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1910851 | Synchronization raster for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1910852 | Guard band on wideband operation | Huawei, HiSilicon | imported from 3GU |
R4‑1910853 | NR-U UE ACLR requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1910854 | Further consideration on adding wider channel bandwidths in Band n77n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1910855 | CR for TS 38.101: adding wider channel bandwidths | Huawei, HiSilicon | imported from 3GU |
R4‑1910856 | CR for TS 38.104: adding wider channel bandwidths in Band n77/n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1910857 | CR for TS 38.307: additional UE channel bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑1910858 | LS to RAN2 on adding 70MHz UE CBW in Band n77/n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1910859 | CR to 38.101-1: Addition of channel bandwidth for band n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1910860 | CR for TS 38.104: Addition channel bandwidth of 40MHz for n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1910861 | work plan for addition of asymmetric channel bandwidth for NR band n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910862 | UE RF requirements for additon of channel bandwidths for n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910863 | Discussion on the support of asymmetric channel bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑1910864 | Draft CR to 38.104: addition of channel bandwidths for band n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910865 | UE REFSENS for 25 MHz channel bandwidth for n1 | Huawei, HiSilicon, China Unicom | imported from 3GU |
R4‑1910866 | Discussion on basket WI for adding new channel bandwidth(s) support to existing NR bands | Huawei, HiSilicon | imported from 3GU |
R4‑1910867 | Discussion on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1910868 | Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1910869 | Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1910870 | Correction to co-existene and co-loaction spurious emissions applicability range | Huawei, HiSilicon | imported from 3GU |
R4‑1910871 | TR 37.716-21-11 v0.7.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1910872 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1910873 | draft CR on introduction of completed EN-DC of 2 bands LTE and 1 band NR from RAN4#91 into TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1910874 | TP for TR 37.716-11-11: DC_66_n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1910875 | Draft CR to 38.101-3: DC_2A_n78(2A), DC_5A_n78(2A), DC_7A_n78(2A), DC_66A_n78(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1910876 | TP for TR 37.716-11-11: DC_12A_n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1910877 | TP for TR 37.716-31-11: DC_2-7-66_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1910878 | TP for TR 37.716-31-11: DC_2-13-66_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910879 | TP for TR 37.716-31-11: DC_7-13-66_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1910880 | TP for TR 38.716-02-00: CA_n66A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1910881 | Adding band n71 to 4 Rx antenna ports support in 38.101-1 | T-Mobile USA Inc. | imported from 3GU |
R4‑1910882 | Draft CR on corrections for PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1910883 | Draft CR on corrections for FR1 CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1910884 | Draft CR on corrections for FR2 CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1910885 | Draft CR on corrections for MIMO Correlation Matrices | Qualcomm Incorporated | imported from 3GU |
R4‑1910886 | TP for TR 37.716-33: DC_66A_n5A-n260 and DC_66A_n5A-n261 | Qualcomm Incorporated | imported from 3GU |
R4‑1910887 | Pcmax correction for the FR2 CA | Qualcomm Incorporated | imported from 3GU |
R4‑1910888 | Work plan for adding wider channel bandwidth in NR band n28 | CBN, Huawei, HiSilicon | imported from 3GU |
R4‑1910889 | DraftCR on handover 36.133 | MediaTek inc. | imported from 3GU |
R4‑1910890 | DraftCR on handover 38.133 | MediaTek inc. | imported from 3GU |
R4‑1910891 | DraftCR on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | MediaTek inc. | imported from 3GU |
R4‑1910892 | DraftCR on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | MediaTek inc. | imported from 3GU |
R4‑1910893 | DraftCR on the BWP switch test cases SA FR1 (section A.6.5.6) | MediaTek inc. | imported from 3GU |
R4‑1910894 | DraftCR on the BWP switch test cases SA FR2 (section A.7.5.6) | MediaTek inc. | imported from 3GU |
R4‑1910895 | Discussion on NR V2X specification skeleton | MediaTek inc. | imported from 3GU |
R4‑1910896 | Link-level simulation assumptions for NR V2X synchronization | MediaTek inc., LG Electronics | imported from 3GU |
R4‑1910897 | Link-level simulation assumptions for NR V2X S-RSRP measurements | MediaTek inc., LG Electronics | imported from 3GU |
R4‑1910898 | Link-level simulation results for NR V2X synchronization | MediaTek inc. | imported from 3GU |
R4‑1910899 | Link-level simulation results for NR V2X S-RSRP measurements | MediaTek inc. | imported from 3GU |
R4‑1910900 | Discussion on NR V2X communication in asynchronous network | MediaTek inc. | imported from 3GU |
R4‑1910901 | Discussion on NR V2X synchronization related requirement | MediaTek inc. | imported from 3GU |
R4‑1910902 | Discussion on NR V2X interruption requirement | MediaTek inc. | imported from 3GU |
R4‑1910903 | Discussion on Interruption at SRS carrier switch | MediaTek inc. | imported from 3GU |
R4‑1910904 | Discussion on CGI reading requirement for NR | MediaTek inc. | imported from 3GU |
R4‑1910905 | Discussion on Multiple SCell activation | MediaTek inc. | imported from 3GU |
R4‑1910906 | Discussion on remaining issues in TCI state switch | MediaTek inc. | imported from 3GU |
R4‑1910907 | DraftCR on TCI state switch | MediaTek inc. | imported from 3GU |
R4‑1910908 | Further discussion on EN-DC configuration including FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1910909 | CR on TS38.133 for SSB settings for new gap and SMTC configurations (Section A.3.10) | MediaTek inc. | imported from 3GU |
R4‑1910910 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR1 (Section A.4.7.3) | MediaTek inc. | imported from 3GU |
R4‑1910911 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR2 (Section A.5.7.3) | MediaTek inc. | imported from 3GU |
R4‑1910912 | CR on TS38.133 for SA SS-SINR tests with PCell in FR1 (Section A.6.7.3) | MediaTek inc. | imported from 3GU |
R4‑1910913 | CR on TS38.133 for SA SS-SINR tests with PCell in FR2 (Section A.7.7.3) | MediaTek inc. | imported from 3GU |
R4‑1910914 | CR on TS38.133 for E-UTRAN – NR inter-RAT measurements test case (Section A.8.5.2) | MediaTek inc. | imported from 3GU |
R4‑1910915 | Discussion on UE dynamic adaptation to the maximum number of MIMO layers | MediaTek inc. | imported from 3GU |
R4‑1910916 | Discussion on RRM measurement relaxation for RRC_IDLE/INACTIVE | MediaTek inc. | imported from 3GU |
R4‑1910917 | Discussion on IDLE/INACTIVE mode CA measurement | MediaTek inc. | imported from 3GU |
R4‑1910918 | Discussion on fast SCell activation | MediaTek inc. | imported from 3GU |
R4‑1910919 | Discussion on requirement of conditional handover | MediaTek inc. | imported from 3GU |
R4‑1910920 | Discussion on new capability for NR measurement and mandatory MG patterns in Rel-16 | MediaTek inc. | imported from 3GU |
R4‑1910921 | LS on new capability for NR measurement and mandatory MG patterns in Rel-16 | MediaTek inc. | imported from 3GU |
R4‑1910922 | System level Simulation Results for PRS-RSTD and PRS-RSRP Core Requirement | MediaTek inc. | imported from 3GU |
R4‑1910923 | Discussion on FR2 RSTD reference point | MediaTek inc. | imported from 3GU |
R4‑1910924 | Discussion on PRS measurement without gaps and differential RSRP consideration for test cases | MediaTek inc. | imported from 3GU |
R4‑1910925 | PC2 output power and UL dutycycle | NTT DOCOMO, INC. | imported from 3GU |
R4‑1910926 | Further discussion on UE demodulation for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1910927 | Further discussion on BS demodulation for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1910928 | Discussion on inter-RAT measurement requirements for NR HST | CMCC | imported from 3GU |
R4‑1910929 | General discussion on RRM for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1910930 | Draft CR on inter-RAT measurement in TS38.133 (section 9.4) | CMCC | imported from 3GU |
R4‑1910931 | WF on BS demodulation for NR HST | CMCC | imported from 3GU |
R4‑1910932 | WF on UE demodulation for NR HST | CMCC | imported from 3GU |
R4‑1910933 | WF on RRM for NR HST | CMCC | imported from 3GU |
R4‑1910934 | Discussion on CSI-RS based RRM requirements | CMCC | imported from 3GU |
R4‑1910935 | Discussion on mandating gap patterns for Rel-16 NR | CMCC | imported from 3GU |
R4‑1910936 | Updated simulation results for UE demodulation in CA for high speed scenario | CMCC | imported from 3GU |
R4‑1910937 | Further reply LS on NR fast SCell activation | MediaTek (Shenzhen) Inc. | imported from 3GU |
R4‑1910938 | Discussion on SSB raster of NR-U 5GHz band | OPPO | imported from 3GU |
R4‑1910939 | Discussion on UL and SL prioritization for NR-V2X | OPPO | imported from 3GU |
R4‑1910940 | draft reply LS on UL and SL prioritization for NR-V2X | OPPO | imported from 3GU |
R4‑1910941 | Discussion on switching and interruption requirement for MIMO layer adaption | OPPO | imported from 3GU |
R4‑1910942 | Discussion on inter-frequency measurement requirement | OPPO | imported from 3GU |
R4‑1910943 | CR on requirements of NR interfrequency measurement (9.3.1) | OPPO | imported from 3GU |
R4‑1910944 | CR on requirements of NR interfrequency measurement (9.3.4,9,3,5) | OPPO | imported from 3GU |
R4‑1910945 | Discussion on definition of CSI-RS based intra-frequency and inter-frequency measurement | OPPO | imported from 3GU |
R4‑1910946 | Discussion on RRM measurement relaxation for NR power saving | CATT | imported from 3GU |
R4‑1910947 | Link-level simulation assumptions for RRM measurements for power saving UE | CATT | imported from 3GU |
R4‑1910948 | WF on RRM measurement relaxation for NR power saving | CATT | imported from 3GU |
R4‑1910949 | Link-level simulation assumptions for CSI-RS based measurements | CATT | imported from 3GU |
R4‑1910950 | Simulation results for CSI-RSRP measurement accuracy | CATT | imported from 3GU |
R4‑1910951 | Discussion on measurement bandwidth of CSI-RS for the minimum requirements | CATT | imported from 3GU |
R4‑1910952 | Discussion on definition of CSI-RS based intra-frequency and inter-frequency measurement | CATT | imported from 3GU |
R4‑1910953 | Discussion on CSI-RS based UE measurement capabilities | CATT | imported from 3GU |
R4‑1910954 | Discussion on CSI-RS based intra-frequecny measurement requirement | CATT | imported from 3GU |
R4‑1910955 | TP on BS RF requirements for adding channel bandwidth in band n28 | CATT | imported from 3GU |
R4‑1910956 | WF on CSI-RS based RRM measurements requirements | CATT | imported from 3GU |
R4‑1910957 | LS on definition of CSI-RS based intra-frequency and inter-frequency measurement | CATT | imported from 3GU |
R4‑1910958 | Discussion on multiple SCell activation and deactivation requirements | CATT | imported from 3GU |
R4‑1910959 | Further discussion on V2X UE transmit timing requirement | CATT | imported from 3GU |
R4‑1910960 | Discussion on selection and reselection of V2X synchronization resource | CATT | imported from 3GU |
R4‑1910961 | Discussion on RRM requirement for high speed train scenario in NR | CATT | imported from 3GU |
R4‑1910962 | CR on active BWP switch delay | CATT | imported from 3GU |
R4‑1910963 | Editorial correction for SCell activation and deactivation delay | CATT | imported from 3GU |
R4‑1910964 | Initial system simulation results for RSTD measurement | CATT | imported from 3GU |
R4‑1910965 | Link-level simulation Assumptions for RSTD | CATT | imported from 3GU |
R4‑1910966 | Discussion on RSTD Measurement Report Mapping | CATT | imported from 3GU |
R4‑1910967 | Discussion on UE Rx-Tx Time Difference Measurement Report Mapping | CATT | imported from 3GU |
R4‑1910968 | Discussion on UE Rx-Tx Time Difference Measurement delay | CATT | imported from 3GU |
R4‑1910969 | Draft CR for TS38.101-1, Editorial corrections | CATT | imported from 3GU |
R4‑1910970 | Draft CR for addition requirement for EN-DC PC2 UE | CATT, CMCC | imported from 3GU |
R4‑1910971 | Further discussion on requirements for maximum MIMO layer adaptation | CATT | imported from 3GU |
R4‑1910972 | Discussion on requirement for PDCCH-based power saving signal channel | CATT | imported from 3GU |
R4‑1910973 | Discuss on the channel arrangement design for 5G V2X UE | CATT | imported from 3GU |
R4‑1910974 | TP for channel arrangement design for 5G V2X UE | CATT | imported from 3GU |
R4‑1910975 | Further discussion on reference point for timing related measurements in FR2 | CATT | imported from 3GU |
R4‑1910976 | Response LS on Reference Point for Timing Related Measurements in FR2 | CATT | imported from 3GU |
R4‑1910977 | Impact of positioning measurement on RRM measurement | CATT | imported from 3GU |
R4‑1910978 | Discussion on measurement requirements for RSTD | CATT | imported from 3GU |
R4‑1910979 | TP for Tx requirements for NR V2X | CATT | imported from 3GU |
R4‑1910980 | TP for Rx requirements for NR V2X | CATT | imported from 3GU |
R4‑1910981 | Discussion on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1910982 | Draft reply LS on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1910983 | Discussion on HST PUSCH demodulation requirement | CATT | imported from 3GU |
R4‑1910984 | Discussion on HST PRACH demodulation requirement | CATT | imported from 3GU |
R4‑1910985 | Discussion on PUSCH performance requirement with 30% throughput metric | CATT | imported from 3GU |
R4‑1910986 | Draft CR for TS38.141-1: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1910987 | Draft CR for TS38.141-2: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1910988 | Draft CR for TS37.145-1: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1910989 | Draft CR for TS37.145-2: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1910990 | Draft CR for TS37.141: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1910991 | Draft CR for specifying requirements for power saving | CATT | imported from 3GU |
R4‑1910992 | WF on switching and interruption for MIMO layer adaption | CATT | imported from 3GU |
R4‑1910993 | LS on switching and interruption time for MIMO layer adaption | CATT | imported from 3GU |
R4‑1910994 | On the probe layout on FR2 MPAC systems, continued | Spirent Communications | imported from 3GU |
R4‑1910995 | Draft CR to TS 38.101-4: Corrections for Applicability rules | Intel Corporation | imported from 3GU |
R4‑1910996 | Draft CR to TS 38.101-4: Editorial corrections for PDSCH RMC | Intel Corporation | imported from 3GU |
R4‑1910997 | Discussion on NR UE performance requirements for NE-DC and NR-DC | Intel Corporation | imported from 3GU |
R4‑1910998 | Draft CR to TS 38.101-4: Introduction of NE-DC and NR-DC SDR requirements | Intel Corporation | imported from 3GU |
R4‑1910999 | Discussion on NR CA UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1911000 | Discussion on UE demodulation requirements for LTE-NR coexistence scenarios | Intel Corporation | imported from 3GU |
R4‑1911001 | Discussion on NR CA UE requirements with power imbalance | Intel Corporation | imported from 3GU |
R4‑1911002 | Discussion on feasibility of DL 256QAM in FR2 scenarios | Intel Corporation | imported from 3GU |
R4‑1911003 | Views on the demodulation requirements for NR HST-SFN scenario | Intel Corporation | imported from 3GU |
R4‑1911004 | Views on the demodulation requirements for NR single tap HST scenario | Intel Corporation | imported from 3GU |
R4‑1911005 | [Draft] LS on network assistance signalling for NR HST scenarios | Intel Corporation | imported from 3GU |
R4‑1911006 | Simulation results for LTE HST bidirectional SFN CA scenario | Intel Corporation | imported from 3GU |
R4‑1911007 | Simulation results for LTE HST bidirectional SFN scenario | Intel Corporation | imported from 3GU |
R4‑1911008 | Simulation results for LTE HST Single Tap scenario | Intel Corporation | imported from 3GU |
R4‑1911009 | Initial discussion on RRM requirements of BWP switching on multiple CCs | Intel Corporation | imported from 3GU |
R4‑1911010 | Discussion on SFTD measurements | Intel Corporation | imported from 3GU |
R4‑1911011 | [Draft] Reply LS on SFTD measurements | Intel Corporation | imported from 3GU |
R4‑1911012 | [Draft] Reply LS on SFTD measurements | Intel Corporation | imported from 3GU |
R4‑1911013 | Discussion on mechanism to prevent RLF for URLLC | Intel Corporation | imported from 3GU |
R4‑1911014 | WF on mechanism to prevent RLF for URLLC | Intel Corporation | imported from 3GU |
R4‑1911015 | Discussion on definition of QCL for RRM requirements | Intel Corporation | imported from 3GU |
R4‑1911016 | Draft CR to TS 38.133 on QCL definition | Intel Corporation | imported from 3GU |
R4‑1911017 | Simulation results for PMI reporting with larger number of Tx ports | Intel Corporation | imported from 3GU |
R4‑1911018 | Discussion on PMI reporting test cases with larger number of Tx ports | Intel Corporation | imported from 3GU |
R4‑1911019 | On test feasibility and methodology for high reliability metric for NR URLLC | Intel Corporation | imported from 3GU |
R4‑1911020 | Discussion about RSS for Rel-16 additional MTC enhancements for LTE | Intel Corporation | imported from 3GU |
R4‑1911021 | Discussion about RSRP measurement test method in FR2 | Intel Corporation | imported from 3GU |
R4‑1911022 | Simulation results for CSI-RS L3 measurement for FR1 | Intel Corporation | imported from 3GU |
R4‑1911023 | Discussion about CSI-RS based L3 measurement | Intel Corporation | imported from 3GU |
R4‑1911024 | TP to TR 37.716-21-21: DC_2A-7A-7A_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1911025 | On NR-U channel raster | Intel Corporation | imported from 3GU |
R4‑1911026 | Side conditions on beam correspondence test | Intel Corporation | imported from 3GU |
R4‑1911027 | On FR2 inter-band CA in Rel-16 | Intel Corporation | imported from 3GU |
R4‑1911028 | A-MPR for n39 | Intel Corporation | imported from 3GU |
R4‑1911029 | A-MPR/MPR improvement for B41/n41 EN-DC | Intel Corporation | imported from 3GU |
R4‑1911030 | NR-U UE emission mask and ACLR requirements | Intel Corporation | imported from 3GU |
R4‑1911031 | FR2 MPR enhancement for Rel-16 | Intel Corporation | imported from 3GU |
R4‑1911032 | Discussion on SIB reading impacts on cell reselection requirements of NR-U | Intel Corporation | imported from 3GU |
R4‑1911033 | Further discussion on of NR-U RRC_Idle requirements | Intel Corporation | imported from 3GU |
R4‑1911034 | Discussion on NR-U RLM requirements | Intel Corporation | imported from 3GU |
R4‑1911035 | Discussion on specification structure for NR positioning RRM requirements | Intel Corporation | imported from 3GU |
R4‑1911036 | Draft CR on TS 38.133 structure for NR positioning RRM requirements | Intel Corporation | imported from 3GU |
R4‑1911037 | Discussion on NR DL PRS RSTD requirements for UE | Intel Corporation | imported from 3GU |
R4‑1911038 | Discussion on gNB measurement requirements for NR positioning | Intel Corporation | imported from 3GU |
R4‑1911039 | Updates on RAN4 work scope for NR positioning | Intel Corporation | imported from 3GU |
R4‑1911040 | On Reference Point for Timing Related Measurements | Intel Corporation | imported from 3GU |
R4‑1911041 | WF on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1911042 | Discussion on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1911043 | On conditional handover, PSCell addition/change RRM requirement | Intel Corporation | imported from 3GU |
R4‑1911044 | draftCR on test cases for SA FR2 inter-frequency measurement (section A.5.6.2) | Intel Corporation | imported from 3GU |
R4‑1911045 | draftCR on test cases for SA FR2 inter-frequency measurement (section A.7.6.2) | Intel Corporation | imported from 3GU |
R4‑1911046 | draftCR on test cases for FR2 handover (section A.7.3.1) | Intel Corporation | imported from 3GU |
R4‑1911047 | draftCR on test cases for Redirection from NR in FR2 to NR in FR2 (section A.7.3.2.3) | Intel Corporation | imported from 3GU |
R4‑1911048 | draftCR on handover RRM requirement (section 6.1.1.5) | Intel Corporation | imported from 3GU |
R4‑1911049 | Revised time plan of R16 RRM enhancements WI | Intel Corporation, ZTE Corporation, Apple | imported from 3GU |
R4‑1911050 | WF on R16 NR RRM enhancements | Intel Corporation | imported from 3GU |
R4‑1911051 | draft CR to TS38.141-2 Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1911052 | on OBUE requirement for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1911053 | TP to TR 38.820 OBUE requirement for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1911054 | CR to TR 38.817-02 Add the protection for UE simulator receiver(subclause 11.4.2)_R2 | ZTE Corporation | imported from 3GU |
R4‑1911055 | CR to TS 37.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1911056 | CR to TS 37.113 Correction on radiated emission subclause 8.2 | ZTE Corporation | imported from 3GU |
R4‑1911057 | CR to TS 37.113 Correction on transient phenomena performance criteria subclause 6.2 | ZTE Corporation | imported from 3GU |
R4‑1911058 | CR to TS 37.114 Communication link correction subclause 4.2 | ZTE Corporation | imported from 3GU |
R4‑1911059 | CR to TS 37.114 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1911060 | CR to TS 37.114 Correction on notes in subclause 7.1 | ZTE Corporation | imported from 3GU |
R4‑1911061 | CR to TS 37.114 Correction on radiated emission subclause 8.2 | ZTE Corporation | imported from 3GU |
R4‑1911062 | draftCR to TS 38.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1911063 | Draft CR to TS 38.113 Add the transmitter exclusion band for OTA NR BS(subclause 4.4.1)_R2 | ZTE Corporation | imported from 3GU |
R4‑1911064 | Draft CR to TS 38.113 Editorial Corrections(clause 2 & subclause 3.1)_r1 | ZTE Corporation | imported from 3GU |
R4‑1911065 | Further discussion on protection for UE simulator receiver during RI test to OTA NR BS | ZTE Corporation | imported from 3GU |
R4‑1911066 | Further discussion on IAB EMC requirements | ZTE Corporation | imported from 3GU |
R4‑1911067 | work plan on IAB EMC | ZTE Corporation | imported from 3GU |
R4‑1911068 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911069 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911070 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911071 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911072 | Discussion on uplink transmission timing in NR-U | ZTE Corporation | imported from 3GU |
R4‑1911073 | Discussion on scenario names in NR-U | ZTE Corporation | imported from 3GU |
R4‑1911074 | Correction to the starting point of the DRX cycle length interval | ZTE Corporation | imported from 3GU |
R4‑1911075 | Discussion on RSSI and CO measurements for NR-U | ZTE Corporation | imported from 3GU |
R4‑1911076 | Discussion on switching requirements between case1 and case2 | CMCC | imported from 3GU |
R4‑1911077 | Discussion on inter-frequency measurement without MG | CMCC | imported from 3GU |
R4‑1911078 | Way forward on inter-frequency measurement without MG | CMCC | imported from 3GU |
R4‑1911079 | Further Discussion on NR CA PDSCH normal demodulation | CMCC | imported from 3GU |
R4‑1911080 | DraftCR to remove square brackets for n90 in TS38.101-1 | CMCC | imported from 3GU |
R4‑1911081 | DraftCR to remove square brackets for n90 in TS38.101-3 | CMCC | imported from 3GU |
R4‑1911082 | DraftCR to remove square brackets for n90 in TS38.104 | CMCC | imported from 3GU |
R4‑1911083 | raftCR to add n90 in the NR operating bands in FR1 (3.5.2) | CMCC | imported from 3GU |
R4‑1911084 | TR 38.888 v0.0.1 Adding wider channel bandwidth in NR band n28 | CBN | imported from 3GU |
R4‑1911085 | TR 38.888 v0.0.1 Adding wider channel bandwidth in NR band n28 | CBN | imported from 3GU |
R4‑1911086 | Draft TR 38.883 for FR2 DL 256QAM v0.1.0 | China Telecom | imported from 3GU |
R4‑1911087 | Updated link level simulation results for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1911088 | TP for TR 38.883: Updated link level simulation for FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1911089 | TP for TR 38.883: Conclusion for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1911090 | Discussion on URLLC test methodology for reliability of 99.999% | Huawei, HiSilicon | imported from 3GU |
R4‑1911091 | Further discussion on scenario and transmission schemes | Huawei, HiSilicon | imported from 3GU |
R4‑1911092 | Discussion and simulation results for NR UE demodulation requirements under HST single tap | Huawei, HiSilicon | imported from 3GU |
R4‑1911093 | Discussion and simulation results for NR UE demodulation requirements under HST-SFN | Huawei, HiSilicon | imported from 3GU |
R4‑1911094 | Discussion and simulation results for the general issues for NR HST BS demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911095 | Discussion on the simulation assumptions for NR HST PUSCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911096 | Discussion on the UL timing adjustment requirement for NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911097 | Discussion on the NR HST PRACH performance requirements for format 0 | Huawei, HiSilicon | imported from 3GU |
R4‑1911098 | Discussion on the NR HST PRACH performance requirements for PRACH formats with short sequence length | Huawei, HiSilicon | imported from 3GU |
R4‑1911099 | Discussion on NR normal CA performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911100 | draftCR: test structure for NR FR1 CA normal demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911101 | draftCR: test structure for NR FR2 CA normal demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911102 | Discussion and simulation results for TDD LTE-NR co-existence demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911103 | Discussion on NR FR1 CA and EN-DC PDSCH demodulation requirements with power imbalance | Huawei, HiSilicon | imported from 3GU |
R4‑1911104 | Discussion on PMI reporting requirements with larger number of Tx ports | Huawei, HiSilicon | imported from 3GU |
R4‑1911105 | Discussion on CA CQI test | Huawei,HiSilicon | imported from 3GU |
R4‑1911106 | Discussion on NR Rel-16 BS demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911107 | Simulation results for NR FR2 PUSCH with 2T2R and MCS12 performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911108 | Discussion on NR Rel-15 BS demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911109 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1911110 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1911111 | Simulation results for NR PUCCH multi-slot demodulation requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1911112 | draftCR: Updates for PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1911113 | draftCR: Updates for PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1911114 | draftCR: Updates for PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1911115 | Remove the square brackets for uncertainty and TT for OTA tests in 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1911116 | CR: Updates for NR EN-DC SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1911117 | CR: Updates for NR RMC | Huawei, HiSilicon | imported from 3GU |
R4‑1911118 | Discussion on the signal direction test setup for NR FR2 performance requirements and CSI testing | Huawei, HiSilicon | imported from 3GU |
R4‑1911119 | Discussion and simulation results for LTE UE demodualtion requirements under HST single tap | Huawei, HiSilicon | imported from 3GU |
R4‑1911120 | Simulation results for LTE UE demodualtion requirements with 4Rx for LTE HST enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1911121 | Simulation results for LTE UE HST-SFN CA demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911122 | Discussion on the test applicability rule for LTE HST-SFN CA tests | Huawei, HiSilicon | imported from 3GU |
R4‑1911123 | CR: Addition of 2x4 static channel for LTE HST-SFN channel model (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1911124 | CR: Addition of test applicability rule for LTE HST CA tests (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1911125 | Discussion and simulation results for BS demodulation requirements for LTE HST enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑1911126 | Discussion and simulation results for PRACH restricted set type B | Huawei, HiSilicon | imported from 3GU |
R4‑1911127 | Discussion and simulation results for LTE Rel-15 FeNB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1911128 | Summary of simulation results for LTE Rel-15 FeNB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1911129 | Discussion on performance requirements for intra-band contiguous CA with minimum channel spacing | Huawei, HiSilicon, China Telecom, MediaTek | imported from 3GU |
R4‑1911130 | WF on LTE FDD performance requirements for intra-band contiguous CA with minimum channel spacing | Huawei, HiSilicon, China Telecom, MediaTek | imported from 3GU |
R4‑1911131 | CR: Addition of the performance requirements for intra-band contiguous CA with minimum channel spacing for FDD | Huawei, HiSilicon | imported from 3GU |
R4‑1911132 | CR: Correction of HST-SFN channel model (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑1911133 | CR: Correction of HST-SFN channel model (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1911134 | CR: Updates to HST-SFN channel model (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1911135 | Switching time for between two UL carriers case1 and case 2 | Spreadtrum Communications | imported from 3GU |
R4‑1911136 | Draft CR for TS 38.101-3: Support of n257GHI in DC_1-8-11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911137 | Draft CR for TS 38.101-3: Support of n257GHI in DC_1-11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911138 | Draft CR for TS 38.101-3: Support of n257GHI in DC_1-28_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911139 | Draft CR for TS 38.101-3: Support of 42AC and n257DGHI in DC_1-28-42_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911140 | Draft CR for TS 38.101-3: Support of 42AC and n257DGHI in DC_3-28-42_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911141 | Draft CR for TS 38.101-3: Support of n257GHI in DC_8-11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911142 | Draft CR for TS 38.101-3: Support of n257GHI in DC_11_ n257 | SoftBank Corp. | imported from 3GU |
R4‑1911143 | Draft CR for TS 38.101-3: Support of 42AC and n257DGHI in DC_28-42_n257 | SoftBank Corp. | imported from 3GU |
R4‑1911144 | TP for TR 37.716-21-21: EN-DC_1_n3-n28 | SoftBank Corp. | imported from 3GU |
R4‑1911145 | TP for TR 36.716-04-01: LTE CA_1-3-8-42 | SoftBank Corp. | imported from 3GU |
R4‑1911146 | NR UE power saving, RRM aspects | vivo | imported from 3GU |
R4‑1911147 | Analysis of UE RRM power consumption in RRC IDLE/ INACTIVE | vivo | imported from 3GU |
R4‑1911148 | TP for TR 37.716-21-11: EN-DC_1-8_n3 | SoftBank Corp. | imported from 3GU |
R4‑1911149 | TP for TR 37.716-21-11: EN-DC_1-8_n28 | SoftBank Corp. | imported from 3GU |
R4‑1911150 | Updated TR 37.716-11-11 V0.7.0 Rel16 1 LTE band + 1 NR band EN-DC | CHTTL | imported from 3GU |
R4‑1911151 | TP for TR 37.716-31-11: EN-DC_1-8-42_n77 | SoftBank Corp. | imported from 3GU |
R4‑1911152 | TP for TR 36.716-03-01: LTE CA_1-11-42 | SoftBank Corp. | imported from 3GU |
R4‑1911153 | TP for TR 37.716-21-21: EN-DC_3_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1911154 | TP for TR 37.716-31-11: EN-DC_3-8-42_n77 | SoftBank Corp. | imported from 3GU |
R4‑1911155 | TP for TR 37.716-21-21: EN-DC_8_n3-n28 | SoftBank Corp. | imported from 3GU |
R4‑1911156 | TP for TR 36.716-03-01: LTE CA_8-11-42 | SoftBank Corp. | imported from 3GU |
R4‑1911157 | TP for TR 37.716-21-21: EN-DC_11_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1911158 | TR 38.888 v0.0.1 Adding wider channel bandwidth in NR band n28 | CBN | imported from 3GU |
R4‑1911159 | TP for TR 38.716-03-01: NR CA_n3-n28-n77 | SoftBank Corp. | imported from 3GU |
R4‑1911160 | TP for TR 38.716-03-01: NR CA_n3-n28-n257 | SoftBank Corp. | imported from 3GU |
R4‑1911161 | The 2nd Harmonic Mixing MSD for ENDC B3_n77/n78 | MediaTek Inc., Murata | imported from 3GU |
R4‑1911162 | Revised WID for EN-DC of 1 band LTE + 1 band NR | CHTTL | imported from 3GU |
R4‑1911163 | draft CR on introduction of completed EN-DC of 1 band LTE and 1 band NR | CHTTL | imported from 3GU |
R4‑1911164 | CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1911165 | DC_11_n77 and DC_21_n77 OOBB relaxation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1911166 | Further discussion on system parameters for NR V2X band n47 | vivo | imported from 3GU |
R4‑1911167 | Discussion on system parameters for NR-V2X licensed bands | vivo | imported from 3GU |
R4‑1911168 | Discussion on sync raster calculation for NR-U band n46 | vivo | imported from 3GU |
R4‑1911169 | Discussion on channel raster for NR-U band n46 | vivo | imported from 3GU |
R4‑1911170 | Discussion on switching period between two FR1 uplink carriers | vivo | imported from 3GU |
R4‑1911171 | Impact analysis of RF requirments for eMIMO Full Tx Power | vivo | imported from 3GU |
R4‑1911172 | Discussion on switching and interruption time for UE antenna switching | vivo | imported from 3GU |
R4‑1911173 | Handling remaining TBDs in BS performance requirements | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911174 | Draft CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911175 | Draft CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911176 | Draft CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911177 | Draft CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911178 | Draft CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911179 | Draft CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911180 | Simulation results collection of multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911181 | Simulation results on multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911182 | Discussion on UE requirements for uplink switching | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911183 | System parameters for new FDD bands with variable duplex | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1911184 | Draft CR Correction to one shot timing adjustment in 38.133 | ZTE Corporation | imported from 3GU |
R4‑1911185 | Draft CR to 38.133 R15 Add the missing units to DRX cycle values | ZTE Corporation | imported from 3GU |
R4‑1911186 | TP to TR 37.823 PRB Alignment | Huawei Technologies R&D UK | imported from 3GU |
R4‑1911187 | NR Rel-15 BS demodulation simulations on TDD patterns | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911188 | On NR Rel-15 BS demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911189 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911190 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911191 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911192 | NR Rel-16 HST BS demodulation PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911193 | NR Rel-16 HST BS demodulation PRACH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911194 | On NR Rel-16 HST BS demodulation PUSCH requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911195 | On NR Rel-16 HST BS demodulation PRACH requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911196 | NR Rel-16 performance requirement enhancement BS demodulation simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911197 | On NR Rel-16 performance requirement enhancement BS demodulation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911198 | On NR Rel-16 high reliability BS demodulation requirements and test feasibility | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911199 | DraftCR for Adding SDL to 38.307 | Dish Network | imported from 3GU |
R4‑1911200 | LS on NR V2X synchronization procedures and priority | RAN1, CATT | imported from 3GU |
R4‑1911201 | LS on AGC settling time and RB size of PSFCH | RAN1, LG Electronics | imported from 3GU |
R4‑1911202 | TR 38.716-03-01 v 0.2.0 | CATT | imported from 3GU |
R4‑1911203 | TP for 38.716-03-01: interference analysis for CA_n39A-n41A-n79A | CATT | imported from 3GU |
R4‑1911204 | TP for 38.716-03-01: UE requirements for CA_n8A-n39A-n41A | CATT | imported from 3GU |
R4‑1911205 | Introducing NR intra-band CA for 3DL Bands and 1UL band for 38.101-1 | CATT | imported from 3GU |
R4‑1911206 | Introducing NR intra-band CA for 3DL Bands and 1UL band for 38.101-3 | CATT | imported from 3GU |
R4‑1911207 | UE requirements on Tx swithing between case 1 and case 2 | CATT | imported from 3GU |
R4‑1911208 | Pre-emptive approach for MPE and SAR issues mitigation | InterDigital Communications | imported from 3GU |
R4‑1911209 | [draft] LS out on MPE issues mitigation | InterDigital Communications | imported from 3GU |
R4‑1911210 | Draft CR to TS 37.145-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911211 | Draft CR to TS 37.141: Correction of references for NB-IoT testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911212 | Draft CR to TS 38.817-02: Clarification on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911213 | Draft CR to TS 38.104: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911214 | Draft CR to TS 38.141-1: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911215 | Draft CR to TS 38.141-2: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911216 | Draft CR to TS 38.817-02: Clarification on interfering signal frequency offsets of receiver in-band selectivity and blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911217 | Draft CR to TS 38.104: Finalization of interfering RB centre frequency offsets in receiver narrowband blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911218 | Draft CR to TS 38.141-1: Finalization of interfering RB centre frequency offsets in receiver narrowband blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911219 | Draft CR to TS 38.817-02: Clarification on interfering signal frequency offsets of receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911220 | Draft CR to TS 38.141-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911221 | Proposals on power boosting requirement when NB-IoT is located within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911222 | Discussion on TAGs misalignment between NB-IoT and NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911223 | TP to TR 38.820: Update of BS noise figure over the 7-24 GHz range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911224 | TP to TR 38.820: Update of BS out-of-band blocking requirement over the 7-24 GHz range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911225 | Views on Testability for URLLC | Qualcomm Incorporated | imported from 3GU |
R4‑1911226 | Views on NR CA PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1911227 | Views on feasibility of 256QAM for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1911228 | High power user equipment (Band 12, Band 5) | US Cellular Corporation | imported from 3GU |
R4‑1911229 | On HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1911230 | On HST RRM Test Definition | Qualcomm Incorporated | imported from 3GU |
R4‑1911231 | CR: RRM test definition for Rel-16 HST | Qualcomm Incorporated | imported from 3GU |
R4‑1911232 | On NR V2X cross-RAT configuration | Qualcomm Incorporated | imported from 3GU |
R4‑1911233 | [DRAFT] Reply LS on LS on NR V2X cross-RAT configuration | Qualcomm Incorporated | imported from 3GU |
R4‑1911234 | On NR V2X RRM Core Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1911235 | On NR HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1911236 | Power Boost and IBE in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1911237 | LS on UL power boost mode and IBE relaxation | Qualcomm Incorporated | imported from 3GU |
R4‑1911238 | n259 peak EIRP and REFSENS Budget | Qualcomm Incorporated | imported from 3GU |
R4‑1911239 | Draft CR- Format misalignment on NS_47 protection requirement table | SoftBank Corp. | imported from 3GU |
R4‑1911240 | Draft CR for TS38.104: Corrections on channel bandwdith for band n34 | ZTE Corporation | imported from 3GU |
R4‑1911241 | Draft CR to TS38.104: Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1911242 | Draft CR to TS38.101-3: Correction on channel spacing for intra-band EN-DC carriers (section 5.4B.1) | ZTE Corporation | imported from 3GU |
R4‑1911243 | Draft CR to TS 38.101-1: Replace CBW with symbols defined in the specification | ZTE Corporation | imported from 3GU |
R4‑1911244 | Draft CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1911245 | Draft CR to TS 38.101-2: Correctin on FInterferer (offset) for CA ACS | ZTE Corporation | imported from 3GU |
R4‑1911246 | TP for TR37.716-21-21_ DC_3A_n40A-n41A | ZTE Corporation | imported from 3GU |
R4‑1911247 | TP for TR38.716-03-01_ CA_n3A_n40A-n41A | ZTE Corporation | imported from 3GU |
R4‑1911248 | TP for TR38.716-03-02_ CA_n3A_n40A-n41A | ZTE Corporation | imported from 3GU |
R4‑1911249 | TP for TR37.716-11-11:DC_3_n34 | ZTE Corporation | imported from 3GU |
R4‑1911250 | TP for TR37.716-11-11:DC_8_n34 | ZTE Corporation | imported from 3GU |
R4‑1911251 | TP for TR37.716-11-11:DC_39_n40 | ZTE Corporation | imported from 3GU |
R4‑1911252 | TP for TR 37.716-33_DC_3A_n79A-n258A | ZTE Corporation | imported from 3GU |
R4‑1911253 | TP for TR 38.716-02-00: 2UL for CA_n39A-n40A | ZTE Corporation | imported from 3GU |
R4‑1911254 | TP for TR 38.716-02-00: 2UL for CA_n3A-n40A | ZTE Corporation | imported from 3GU |
R4‑1911255 | TP for TR 38.716-02-00: 2UL for CA_n8A-n40A | ZTE Corporation | imported from 3GU |
R4‑1911256 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1911257 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1911258 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1911259 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1911260 | CR to reflect the completed ENDC combinations for 3 bands DL with 3 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1911261 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1911262 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 3 bands DL with 2 bands UL | ZTE Corporation | imported from 3GU |
R4‑1911263 | Revision WID: Dual Connectivity (EN-DC) with 3 bands DL and 3 bands UL | ZTE Corporation | imported from 3GU |
R4‑1911264 | Discussion on the UE capabilibity solutions for EN-DC FDD-TDD High Power UE | CHTTL | imported from 3GU |
R4‑1911265 | TP for TR 37.716-11-11: adding support of DC_3A-3A_n257D to DC_3A-3A_n257M | CHTTL | imported from 3GU |
R4‑1911266 | TP for TR 37.716-21-21: adding support of DC_3-3_n78_n257, DC_3-3-7_n78_n257, DC_3-3-7-7_n78_n257 with n257D to n257M bandwidth classes | CHTTL | imported from 3GU |
R4‑1911267 | TP for TR 37.716-21-11: UE requirements for DC_3-3-8_n78 | CHTTL | imported from 3GU |
R4‑1911268 | FR2 MIMO UE orientations and test positions | MediaTek Beijing Inc. | imported from 3GU |
R4‑1911269 | TP for TR 37.716-21-11: Adding support of DC_3-3-8_n1, DC_7-7-8_n1, DC_7-7-8_n78 | CHTTL | imported from 3GU |
R4‑1911270 | TP for TR 37.716-31-11: UE requirements for DC_3-7-8_n1, DC_3-3-7-8_n1, DC_3-7-7-8_n1, DC_3-3-7-7-8_n1 | CHTTL | imported from 3GU |
R4‑1911271 | TP for TR 37.716-21-21: UE requirements for DC_8_n1-n78 | CHTTL | imported from 3GU |
R4‑1911272 | TP for TR 37.716-21-11: adding support of DC_3A-3A-7A_n257D to DC_3A-3A-7A_n257M and DC_3A-3A-7A-7A_n257D to DC_3A-3A-7A-7A_n257M | CHTTL | imported from 3GU |
R4‑1911273 | Maximum downlink MIMO layer switching for UE power saving | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911274 | L1-SINR design for eMIMO | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911275 | Delay requirements for CSI-RS L3 measurement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911276 | Views on high-speed train tests for NR | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911277 | Views on normal PDSCH demodulation test for CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911278 | On HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1911279 | On HST RRM Test Definition | Qualcomm Incorporated | imported from 3GU |
R4‑1911280 | CR: RRM test definition for Rel-16 HST | Qualcomm Incorporated | imported from 3GU |
R4‑1911281 | HST UE Demod Simulation and Impairment Results | Qualcomm Incorporated | imported from 3GU |
R4‑1911282 | CR: Editorial correction for Demod test definition for HST in 500km/h speed | Qualcomm Incorporated | imported from 3GU |
R4‑1911283 | On LTE-based 5G terrestrial broadcast | Qualcomm Incorporated | imported from 3GU |
R4‑1911284 | Work plan for LTE-based 5G terrestrial broadcast | Qualcomm Incorporated | imported from 3GU |
R4‑1911285 | On NR V2X cross-RAT configuration | Qualcomm Incorporated | imported from 3GU |
R4‑1911286 | [DRAFT] Reply LS on LS on NR V2X cross-RAT configuration | Qualcomm Incorporated | imported from 3GU |
R4‑1911287 | On NR V2X RRM Core Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1911288 | On NR HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1911289 | TP for TR 36.716-03-02 to include 3 bands DL with 2 bands UL band combinations | LG Electronics Polska | imported from 3GU |
R4‑1911290 | CR to 38.101-1 adding band n91 n92 n93 and n94 | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911291 | CR to 38.101-1 for channel raster and sync raster for new variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911292 | CR to 38.101-1 on 7.5kHz shift for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911293 | CR to 38.101-1 on channel bandwidth and SCS for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911294 | CR to 38.101-1 on the minimum Tx-Rx separation for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911295 | CR to 38.101-1 on the asymmetric channel BW for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911296 | Discussion on the system parameters for the variable duplex FDD bands | Huawei, HiSilicon | imported from 3GU |
R4‑1911297 | CR to 38.104 adding band n91 n92 n93 and n94 | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911298 | CR to 38.104 for channel raster and sync raster for new variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911299 | CR to 38.104 on 7.5kHz shift for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911300 | CR to 38.104 on channel bandwidth and SCS for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911301 | CR to 38.141-1 on OBUE test requirements for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911302 | CR to 38.141-1 on spurious emissions test requirements for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1911303 | TP for TR 36.716-03-02 to include 4 bands DL with 2 bands DL band combinations | LG Electronics Polska | imported from 3GU |
R4‑1911304 | MSD test results for new x bands (x=3,4,5) DL with 2 bands UL CA | LG Electronics Polska | imported from 3GU |
R4‑1911305 | Preliminary simulation results of NR SLSS synchronization | LG Electronics | imported from 3GU |
R4‑1911306 | A-MPR measurement results for 29dBm HPUE B41/n41 EN-DC | LG Electronics Polska | imported from 3GU |
R4‑1911307 | Discussion on NR SCell activation | MediaTek inc. | imported from 3GU |
R4‑1911308 | CR for SCell activation delay in FR2 | MediaTek inc. | imported from 3GU |
R4‑1911309 | Discussion on QCL relation in requirements | MediaTek inc. | imported from 3GU |
R4‑1911310 | CR for measurement restriction in FR2 across CCs | MediaTek inc. | imported from 3GU |
R4‑1911311 | CR for SSB based candidate beam detection | MediaTek inc. | imported from 3GU |
R4‑1911312 | Discussion on scheduling restriction due to L1-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1911313 | CR for scheduling restriction due to L1-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1911314 | CR for SSB based L1-RSRP in FR2 | MediaTek inc. | imported from 3GU |
R4‑1911315 | CR on SSB based RLM test cases for EN-DC FR1 (Section A.4.5.1) | MediaTek inc. | imported from 3GU |
R4‑1911316 | CR on SSB based RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1911317 | CR on SSB based RLM test cases for SA FR1 (Section A.6.5.1) | MediaTek inc. | imported from 3GU |
R4‑1911318 | CR on SSB based RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1911319 | Discussion on test case for CSI-RS RLM | MediaTek inc. | imported from 3GU |
R4‑1911320 | Discussion on handover requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1911321 | Discussion on RRC re-establishment requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1911322 | Discussion on SCell activation and deactivation requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1911323 | Discussion on active BWP switching requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1911324 | Discussion on RLM requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1911325 | Discussion on RRM measurement requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1911326 | Discussion on SFTD measurements towards NR-U with LBT | MediaTek inc. | imported from 3GU |
R4‑1911327 | Further study on power imbalance requirement for intra-band EN-DC/NR CA | DOCOMO Communications Lab. | imported from 3GU |
R4‑1911328 | TP for TR 37.716-11-11 DC_1A_n50A | Huawei, HiSilicon | imported from 3GU |
R4‑1911329 | TP for TR 37.716-11-11 DC_3A_n50A | Huawei, HiSilicon | imported from 3GU |
R4‑1911330 | TP for TR 37.716-11-11 DC_20A_n50A | Huawei, HiSilicon | imported from 3GU |
R4‑1911331 | draftCR to 38.101-3 on DC_40C_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1911332 | Simulation results on the minimum Tx power of IAB MT and ACIR | Huawei, HiSilicon | imported from 3GU |
R4‑1911333 | Measurement interval of frequency error in FR1 and FR2 | Anritsu Corporation | imported from 3GU |
R4‑1911334 | Draft CR to measurement interval of frequency error in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1911335 | Draft CR to measurement interval of frequency error in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1911336 | On undetermined Tx DC location | Anritsu Corporation | imported from 3GU |
R4‑1911337 | ACLR metric and testability improvement in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1911338 | FR2 blocker signal from offset antenna | Anritsu Corporation | imported from 3GU |
R4‑1911339 | Draft CR for blocking measurement procedure | Anritsu Corporation | imported from 3GU |
R4‑1911340 | Introduction of 2 AoA RRM test setup with IFF TRxPs for FR2 | Anritsu Corporation | imported from 3GU |
R4‑1911341 | Draft CR to 2 AoA UE RRM measurement setup in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1911342 | Views on the applicability of NFTF and DNF methods in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1911343 | Preliminary simulation results of SLSS-RSRP measurement accuracy | LG Electronics | imported from 3GU |
R4‑1911344 | Discussion of Synchronization requirements for NR V2X | LG Electronics | imported from 3GU |
R4‑1911345 | Discussion of measurement requirements for NR V2X | LG Electronics | imported from 3GU |
R4‑1911346 | Discussion of interruption for NR V2X | LG Electronics | imported from 3GU |
R4‑1911347 | WF on NR V2X RRM requirement | LG Electronics | imported from 3GU |
R4‑1911348 | Editorial CR on Section 7.5 | LG Electronics | imported from 3GU |
R4‑1911349 | Remaining issues for CLI measurements | LG Electronics Inc. | imported from 3GU |
R4‑1911350 | TP for TR 37.716-21-11: DC_2-13_n260 | Samsung, Verizon | imported from 3GU |
R4‑1911351 | TP for TR 37.716-21-11: DC_2-13_n261 | Samsung, Verizon | imported from 3GU |
R4‑1911352 | TP for TR 37.716-21-11: DC_2-66_n260 | Samsung, Verizon | imported from 3GU |
R4‑1911353 | TP for TR 37.716-21-11: DC_2-66_n261 | Samsung, Verizon | imported from 3GU |
R4‑1911354 | TP for TR 37.716-21-11: DC_13-48_n2 | Samsung, Verizon | imported from 3GU |
R4‑1911355 | TP for TR 37.716-21-11: DC_13-48_n66 | Samsung, Verizon | imported from 3GU |
R4‑1911356 | TP for TR 37.716-21-11: DC_13-66_n260 | Samsung, Verizon | imported from 3GU |
R4‑1911357 | TP for TR 37.716-21-11: DC_2-66_n66 | Samsung, Verizon | imported from 3GU |
R4‑1911358 | TP for TR 37.716-21-11: DC_13-66_n261 | Samsung, Verizon | imported from 3GU |
R4‑1911359 | TP for TR 37.716-21-11: DC_48-66_n5 | Samsung, Verizon | imported from 3GU |
R4‑1911360 | TP for TR 37.716-21-21: DC_8A_n78A-n257 | Samsung, KT | imported from 3GU |
R4‑1911361 | TP for TR 37.716-21-21: DC_3C_n78A-n257 | Samsung, KT | imported from 3GU |
R4‑1911362 | TP for TR 37.716-21-21: DC_3A-8A_n78A-n257 | Samsung, KT | imported from 3GU |
R4‑1911363 | TP for TR 37.716-21-21: DC_1A-8A_n78A-n257A | Samsung, KT | imported from 3GU |
R4‑1911364 | TP for TR 37.716-21-21: DC_1A-3-8A_n78A-n257A | Samsung, KT | imported from 3GU |
R4‑1911365 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1911366 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1911367 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1911368 | Draft CR on NR UCI on PUSCH performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1911369 | Draft CR on NR UCI on PUSCH conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1911370 | Draft CR on NR UCI on PUSCH radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1911371 | Draft CR on correction on FRC table for FR1 PUSCH performance requirements for TS 38.104 | Samsung, China Telecom | imported from 3GU |
R4‑1911372 | Draft CR on correction on FRC table for FR1 PUSCH conducted performance requirements for TS 38.141-1 | Samsung, China Telecom | imported from 3GU |
R4‑1911373 | Draft CR on correction on FRC table for FR1 PUSCH radicated performance requirements for TS 38.141-2 | Samsung, China Telecom | imported from 3GU |
R4‑1911374 | Updated simulation results for NR BS demodulation performance in Rel-15 | Samsung | imported from 3GU |
R4‑1911375 | Updated simulation results for NR UCI on PUSCH | Samsung | imported from 3GU |
R4‑1911376 | Summary of ideal and impairment results for UCI on PUSCH | Samsung | imported from 3GU |
R4‑1911377 | Ideal and impairment simulation results for NR PUCCH with multi-slot | Samsung | imported from 3GU |
R4‑1911378 | View on BS performance requirements for high speed scenario in NR Rel-16 | Samsung | imported from 3GU |
R4‑1911379 | Discussion and initial simulation results for NR HST PUSCH | Samsung | imported from 3GU |
R4‑1911380 | Discussion and initial simulation results for NR HST PRACH | Samsung | imported from 3GU |
R4‑1911381 | View on BS performance requirements for NR performance enhancement | Samsung | imported from 3GU |
R4‑1911382 | Dicussion and simulation results for HST PUSCH in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1911383 | Dicussion and simulation results for HST PRACH in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1911384 | View on URLLC performance requirements in NR Rel-16 | Samsung | imported from 3GU |
R4‑1911385 | Further Discussion on T_delta granularity for IAB OTA timing alignment | Samsung | imported from 3GU |
R4‑1911386 | Reply LS on T_delta granularity for IAB OTA timing alignment | Samsung | imported from 3GU |
R4‑1911387 | Discussion on scope of IAB RRM requirement | Samsung | imported from 3GU |
R4‑1911388 | Discussion on RRM Requirement Scope for Rel-16 NR eMIMO WI | Samsung | imported from 3GU |
R4‑1911389 | WF on RRM Requirement Scope for Rel-16 NR eMIMO WI | Samsung | imported from 3GU |
R4‑1911390 | Discussion on L1-SINR Measurement and Reporting for Rel-16 MIMO Enhancement | Samsung | imported from 3GU |
R4‑1911391 | Discussion on RRM Requirement for SCell BFR | Samsung | imported from 3GU |
R4‑1911392 | Discussion on Enhancement on UL/DL Transmit Beam Selection with Reduced Latency and Overhead | Samsung | imported from 3GU |
R4‑1911393 | System parameter for IAB node | Samsung | imported from 3GU |
R4‑1911394 | Updated simulation result for layout 1 | Samsung | imported from 3GU |
R4‑1911395 | Updated simulation result for layout 2 | Samsung | imported from 3GU |
R4‑1911396 | Tx RF requirement for IAB node | Samsung | imported from 3GU |
R4‑1911397 | Rx RF requirement for IAB node | Samsung | imported from 3GU |
R4‑1911398 | Discussion on IAB spec framework | Samsung | imported from 3GU |
R4‑1911399 | Draft CR for 38.101-3: Correction to DC Config and dual UL interferer | Samsung | imported from 3GU |
R4‑1911400 | Draft CR for 38.101-3: Correction to EN-DC and NE-DC Configurations | Samsung | imported from 3GU |
R4‑1911401 | Beam correspondence enhancement considering SNR condition | Samsung | imported from 3GU |
R4‑1911402 | Discussion on beam correspondence side condition | Samsung | imported from 3GU |
R4‑1911403 | Discussion on spatial correlation error and FR1 probe layout | Samsung | imported from 3GU |
R4‑1911404 | Work Plan for Rel-16 eMIMO WI | Samsung | imported from 3GU |
R4‑1911405 | Dynamic spectrum sharing in LTE refarming bands | Samsung, Comcast | imported from 3GU |
R4‑1911406 | Draft CR for introducing UL 7.5kHz shift on band n48 in TS 38.104 | Samsung, Comcast | imported from 3GU |
R4‑1911407 | Draft CR for introducing UL 7.5kHz shift on band n48 in TS 38.101-1 | Samsung, Comcast | imported from 3GU |
R4‑1911408 | Discussion on enhanced CSI requirements with up to 32 Tx ports | Samsung | imported from 3GU |
R4‑1911409 | Simulation results for PMI test cases | Samsung | imported from 3GU |
R4‑1911410 | RMC for NR MIMO OTA | Samsung, CAICT | imported from 3GU |
R4‑1911411 | Discussion on impact of NR eMIMO on RF requirements | Samsung | imported from 3GU |
R4‑1911412 | LS on SRS-RSRP measurement objective for CLI | LG Electronics Inc. | imported from 3GU |
R4‑1911413 | Draft CR for TS 38.101-1: Editorial correction for n2 uplink configuration note index in Table 7.3.2-3 | MediaTek Inc. | imported from 3GU |
R4‑1911414 | Discussion on required measurement period for CLI | LG Electronics Inc. | imported from 3GU |
R4‑1911415 | Discussion on reporting range for CLI measurement | LG Electronics Inc. | imported from 3GU |
R4‑1911416 | LS on CLI measurement reporting range | LG Electronics Inc. | imported from 3GU |
R4‑1911417 | Discussion on scheduling restriction for CLI measurement | LG Electronics Inc. | imported from 3GU |
R4‑1911418 | Draft CR for TS 38.101-1: Removing CA configurations for CA_n77D/E, CA_n78D/E, and CA_n79D/E | MediaTek Inc. | imported from 3GU |
R4‑1911419 | Draft CR for cross link interference measurements (scetion 9) | LG Electronics Inc. | imported from 3GU |
R4‑1911420 | Draft CR for cross link interference measurements performance requirements (scetion 10) | LG Electronics Inc. | imported from 3GU |
R4‑1911421 | Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc. | imported from 3GU |
R4‑1911422 | [draft] CR on introducing UE demodulation tests for single tap HST with 500km/h | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911423 | Handover delay and interruption time for conditional handover | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911424 | Clarification on QCL assumption for RRM requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911425 | [draft] Clarification CR on applicability for QCL assumption for RRM requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911426 | Draft CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc. | imported from 3GU |
R4‑1911427 | TR 36.716-03-02 v0.7.0 LTE-A inter-band CA for x bands DL (x=3,4,5) with 2 bands UL in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1911428 | Revised WID on LTE-A inter-band CA for x bands (x=3,4,5) DL with 2 bands UL in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1911429 | On SFTD measurement between NR PCell and intra-frequency NR neighbour cells for NR SA | Apple | imported from 3GU |
R4‑1911430 | Reply LS on SFTD measurement between NR PCell and intra-frequency NR neighbour cells for NR SA | Apple | imported from 3GU |
R4‑1911431 | On definition of SFTD measurement | Apple | imported from 3GU |
R4‑1911432 | Reply LS on definition of SFTD measurement | Apple | imported from 3GU |
R4‑1911433 | Wayforward on R16 NR RRM enhancement | Apple | imported from 3GU |
R4‑1911434 | Draft CR Correction to one shot timing adjustment in 38.133 | ZTE Corporation | imported from 3GU |
R4‑1911435 | Draft CR to 38.133 R15 Add the missing units to DRX cycle values | ZTE Corporation | imported from 3GU |
R4‑1911436 | Draft CR Correction to the units of interruption length in 38.133 | ZTE Corporation | imported from 3GU |
R4‑1911437 | Draft CR for conditions for cross link interference measurements (scetion B) | LG Electronics Inc. | imported from 3GU |
R4‑1911438 | Introduction of LTE-A inter-band CA for new x bands (x=3,4,5) DL with 2 bands UL to TS 36.101 in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1911439 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911440 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911441 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1911442 | Draft CR for Abbreviations for cross link interference (scetion 3) | LG Electronics Inc. | imported from 3GU |
R4‑1911443 | TR 37.716-21-21 v0.7.0 update: LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1911444 | vised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1911445 | Link budget analysis for n259 | Samsung | imported from 3GU |
R4‑1911446 | Introducing CR on new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1911447 | TP on summary of self-interference analysis for new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1911448 | MSD results for new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1911449 | FR2 spherical coverage simulation results for enhancement of PC3 UE | LG Electronics France | imported from 3GU |
R4‑1911450 | Discussion on enhancement for RLF mitigation due to MPE on FR2 | LG Electronics France | imported from 3GU |
R4‑1911451 | TR 38.886 v0.3.0 | LG Electronics France | imported from 3GU |
R4‑1911452 | TP on the operating scenarios for NR V2X Service | LG Electronics France | imported from 3GU |
R4‑1911453 | Consideration on RF architecture for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1911454 | Coexistence simulation results in licensed bands | LG Electronics France | imported from 3GU |
R4‑1911455 | General Tx/Rx requirements for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1911456 | TP on General Tx/Rx requirements for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1911457 | Discussion on NR V2X signal impact and transient period based on S-SSB structure | LG Electronics France | imported from 3GU |
R4‑1911458 | Draft reply LS on UL-SL prioritization | LG Electronics France | imported from 3GU |
R4‑1911459 | Discussion on channel arrangement of NR V2X | LG Electronics France | imported from 3GU |
R4‑1911460 | Discussion on transient period for NR V2X S-SSB design | LG Electronics France | imported from 3GU |
R4‑1911461 | Modification on TM3.3 for QPSK only condition | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1911462 | draft CR for 36.101: adding BCS2 for CA_2-13 | Huawei, HiSilicon | imported from 3GU |
R4‑1911463 | TP for TR 36.716-02-01: CA_7A-13A, CA_7C-13A, CA_7A-7A-13A | Huawei, HiSilicon | imported from 3GU |
R4‑1911464 | TP for TR 36.716-03-01: CA_2A-7A-13A, CA_2A-7C-13A, CA_2A-7A-7A-13A | Huawei, HiSilicon | imported from 3GU |
R4‑1911465 | TP for TR 36.716-03-01: CA_7A-13A-66A, CA_7C-13A-66A | Huawei, HiSilicon | imported from 3GU |
R4‑1911466 | TP for TR 36.716-04-01: CA_2A-7A-13A-66A, CA_2A-7C-13A-66A | Huawei, HiSilicon | imported from 3GU |
R4‑1911467 | updated TP for TR 38.716-02-00: CA_n7A-n78A and CA_n7A-n78(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1911468 | TP for TR 38.716-02-00: CA_n1A-n3A and CA_n1B-n3A | Huawei, HiSilicon | imported from 3GU |
R4‑1911469 | TP for TR 38.716-02-00: CA_n1-n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1911470 | TP for TR 38.716-02-00: CA_n28-n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1911471 | TP for TR 38.716-01-01: DL_n3(2A)_UL_n3A | Huawei, HiSilicon | imported from 3GU |
R4‑1911472 | TP for TR 38.716-01-01: DL_n7(2A)_UL_n7A | Huawei, HiSilicon | imported from 3GU |
R4‑1911473 | draft CR for 38.101-1: add requiremnts for CA_n1B | Huawei, HiSilicon | imported from 3GU |
R4‑1911474 | draft CR for 38.101-3 adding configuration DC_1A_n78(2A) for DC_1_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1911475 | draft CR for 38.101-3 adding configuration DC_3A_n78(2A) for DC_3_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1911476 | draft CR for 38.101-3 adding configuration DC_3A_n77(2A) for DC_3_n77 | Huawei, HiSilicon | imported from 3GU |
R4‑1911477 | TP for TR 37.716-11-11: DL_4A_n38A_UL_4A_n38A | Huawei, HiSilicon | imported from 3GU |
R4‑1911478 | TP for TR 37.716-11-11: DL_4A_n41A_UL_4A_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1911479 | TP for TR 37.716-11-11: DL_4A_n78A_UL_4A_n78A and 4A_n78(2A)_UL_4A_n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1911480 | TP for TR 37.716-31-11: DC_3-7-40_n1 | Huawei, HiSilicon | imported from 3GU |
R4‑1911481 | updated TP for TR 37.716-31-11: DC_1-3-7_n78 to add DC_1A-3C-7C_n78(A) | Huawei, HiSilicon | imported from 3GU |
R4‑1911482 | updated TP for TR 37.716-21-21: DC_1-3_n7-n78 to add configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1911483 | updated TP for TR 37.716-21-21: DC_3-7_n1-n78 to add configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1911484 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1911485 | CR for 38.101-1 introduce SUL band combination DL_n78(2A)_SUL_n78A-n86A | Huawei, HiSilicon | imported from 3GU |
R4‑1911486 | TR 37.716-00-00 v0.5.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1911487 | draft CR for 38.101-3: correct MSD exception for DC_2_n78(Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1911488 | draft CR for 38.101-3: correct MSD exception for DC_28_n41 and DC_1A_n77(2A) (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1911489 | [V2X] NR V2X coexistence simulation results for ITS spectrum case1 and case3 | Huawei, HiSilicon | imported from 3GU |
R4‑1911490 | [V2X] NR V2X coexistence simulation results for ITS spectrum case2 and case4 | Huawei, HiSilicon | imported from 3GU |
R4‑1911491 | [V2X] NR V2X coexistence simulation results for licensed band | Huawei, HiSilicon | imported from 3GU |
R4‑1911492 | [V2X] TP on link level simulation mapping for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1911493 | [V2X] On link level simulation result for PRR evaluation | Huawei, HiSilicon | imported from 3GU |
R4‑1911494 | [V2X] TP on output RF spectrum emissions for NR V2X in band n47 | Huawei, HiSilicon | imported from 3GU |
R4‑1911495 | [V2X] TP on maximum output power requirements and MPR simulation assumption for NR V2X in band n47 | Huawei, HiSilicon | imported from 3GU |
R4‑1911496 | [n28BW] TP on BS RF requirements for adding wider channel bandwidth in band n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1911497 | [n28BW] Discussion on UE RF REFSENS for adding wider channel bandwidth in band n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1911498 | [n28BW] Discussion on UE RF spurious emission and MPR simulations assumption for adding wider channel bandwidth in band n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1911499 | Views on the work plan for the FR2 RRM work item | Apple Inc. | imported from 3GU |
R4‑1911500 | Work plan for FR2 test method enhancement | Apple Inc., CAICT | imported from 3GU |
R4‑1911501 | TR38.xyz skeleton for FR2 test method enhancement | Apple Inc. | imported from 3GU |
R4‑1911502 | Views on the high DL power and low UL power objective | Apple Inc. | imported from 3GU |
R4‑1911503 | Views on the polarization mismatch objective | Apple Inc. | imported from 3GU |
R4‑1911504 | Handover delay and interruption time for simultaneous Tx/Rx with the source and target cells | Apple Inc. | imported from 3GU |
R4‑1911505 | Further considerations on the uplink duty cycle enhancements for the MPE scenario | Apple Inc. | imported from 3GU |
R4‑1911506 | Motivation for LTE/NR spectrum sharing in band 48/n48 frequency range | Apple Inc., Federated Wireless | imported from 3GU |
R4‑1911507 | New WID: LTE/NR spectrum sharing in band 48/n48 frequency range | Apple Inc. | imported from 3GU |
R4‑1911508 | LTE/NR spectrum sharing in band 48/n48 frequency range | Apple Inc., Federated Wireless | imported from 3GU |
R4‑1911509 | Further views on beam correspondence enhancements in Rel-16 | Apple Inc. | imported from 3GU |
R4‑1911510 | Views on FR2 DL inter-band CA | Apple Inc. | imported from 3GU |
R4‑1911511 | Views on spherical coverage requirements for initial access | Apple Inc. | imported from 3GU |
R4‑1911512 | Carrier switching to enable non-simultaneous transmission for intra-band non-contiguous UL CA in FR2 | Apple Inc. | imported from 3GU |
R4‑1911513 | Derivation of peak EIRP and REFSENS for band n259 | Apple Inc. | imported from 3GU |
R4‑1911514 | TP to TR38.820: corrections of deployment scenarios | Apple Inc. | imported from 3GU |
R4‑1911515 | Further views on the environmental conditions for FR1 MIMO OTA | Apple Inc. | imported from 3GU |
R4‑1911516 | Views on the MPAC probe layout for FR1 MIMO OTA | Apple Inc. | imported from 3GU |
R4‑1911517 | Views on adding new Channel Bandwidths for n77/n78 | Apple | imported from 3GU |
R4‑1911518 | Views on adding new Channel Bandwidths for n25 | Apple | imported from 3GU |
R4‑1911519 | Views on adding new Channel Bandwidths for NR bands | Apple | imported from 3GU |
R4‑1911520 | Single UL as UE capability | Apple | imported from 3GU |
R4‑1911521 | [V2X] TP on subclause title for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1911522 | CP-OFDM almost contiguous allocations for Power Class 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911523 | Region 1 Extension for Power Class 3 Operation in FR2 and output power boosting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911524 | On network control in context of Tx power boost during suspended IBE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911525 | FR2 Intraband Non-contiguous UL CA MPR simulations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911526 | FR2 MPE mitigation solutions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911527 | LS out on FR2 MPE mitigation solutions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911528 | FR2 BC enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911529 | Bracket clean up 38.101-1 REL15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911530 | Bracket clean up 38.101-3 REL15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911531 | Draft CR for addition of 66-n5-n260 and 66-n5-n261 | Nokia, Verizon | imported from 3GU |
R4‑1911532 | Draft CR for addition of DC_2+46+66_n261 | Nokia, TMO US | imported from 3GU |
R4‑1911533 | Correction to add 10 and 15 MHz into A-MPR table for n7 | Nokia | imported from 3GU |
R4‑1911534 | n25 REFSENS | Nokia | imported from 3GU |
R4‑1911535 | TP to TR 37.716-21-21: Addition of DL_7C_n1A-n78A | Nokia, BT | imported from 3GU |
R4‑1911536 | TP to TR 37.716-21-21: Addition of DL_3C_n1A-n78A | Nokia, BT | imported from 3GU |
R4‑1911537 | TP to TR 37.716-21-21: Addition of DL_3A-7C_n1A-n78A, DL_3C-7A_n1A-n78A and DL_3C-7C_n1A-n78A | Nokia, BT | imported from 3GU |
R4‑1911538 | Frequency separation class clarification REL-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911539 | Frequency separation class clarification REL-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911540 | EN-DC grouping correction for FR1 only configurations REL-16 | Nokia | imported from 3GU |
R4‑1911541 | EN-DC grouping correction for configurations including FR2 REL-16 | Nokia | imported from 3GU |
R4‑1911542 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1911543 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1911544 | PC2 capability indication for SA operation | Ericsson | imported from 3GU |
R4‑1911545 | Power class, SEM and ACLR for 5 GHz NR-U | Ericsson | imported from 3GU |
R4‑1911546 | Selectivity and blocking for 5 GHz NR-U | Ericsson | imported from 3GU |
R4‑1911547 | Channel raster design and intra-carrier GB for wideband (WB2) operation | Ericsson | imported from 3GU |
R4‑1911548 | SEM for multi-channel NR-U operation at 5 GHz | Ericsson | imported from 3GU |
R4‑1911549 | Beam correspondence during initial access and relation to OL power control | Ericsson, Sony | imported from 3GU |
R4‑1911550 | On the timing requiremens for FDD bands with variable duplex | Ericsson | imported from 3GU |
R4‑1911551 | On the network signaling values NS_12-NS_14 for n26 | Ericsson | imported from 3GU |
R4‑1911552 | TP for 37.815: FDD-TDD PC2 Option 2 | Ericsson | imported from 3GU |
R4‑1911553 | Draft CR to 38.133 on inter frequency SFTD measurement accuracy requirements | ZTE | imported from 3GU |
R4‑1911554 | Further discussion on one shot timing adjustment requirements | ZTE | imported from 3GU |
R4‑1911555 | Draft CR to 38.133 on one shot timing adjustment requirements | ZTE | imported from 3GU |
R4‑1911556 | Remaining issues on NR reporting criteria | ZTE | imported from 3GU |
R4‑1911557 | Draft CR to 38.133 NR reporting criteria | ZTE | imported from 3GU |
R4‑1911558 | CR to 36.133 on NR reporting criteria | ZTE | imported from 3GU |
R4‑1911559 | CR to 36.133 on NR reporting criteria | ZTE | imported from 3GU |
R4‑1911560 | Further discussion on IAB OTA synchronization and RRM requirements | ZTE | imported from 3GU |
R4‑1911561 | draft Reply LS on OTA timing alignment for IAB | ZTE | imported from 3GU |
R4‑1911562 | Discussion on CGI reading of NR cell with autonomous gaps | ZTE | imported from 3GU |
R4‑1911563 | Discussion on CGI reading of LTE cell with autonomous gaps | ZTE | imported from 3GU |
R4‑1911564 | Discussion on inter frequency measurement without gaps | ZTE | imported from 3GU |
R4‑1911565 | Discussion on mandatary of measurement gap patterns | ZTE | imported from 3GU |
R4‑1911566 | Discussion on SRS carrier switching RRM requirements | ZTE | imported from 3GU |
R4‑1911567 | Discussion on RRM requirements for multiple Scell activation and deactivation | ZTE | imported from 3GU |
R4‑1911568 | WF on RRM enhancement | ZTE | imported from 3GU |
R4‑1911569 | discussion on CSI-RS based RRM measurements | ZTE | imported from 3GU |
R4‑1911570 | EN-DC power sharing testing | MediaTek Inc. | imported from 3GU |
R4‑1911571 | FR2 inter-band CA MRTD | MediaTek Inc. | imported from 3GU |
R4‑1911572 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911573 | Remove double entry of CA_41F | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911574 | Correction of Note number in Table 5.6.1-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911575 | Correction of Note number in Table 5.6.1-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911576 | TP to correct inconsistent fallback BCS for CA_1A-3A-3A-5A-7A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911577 | DeltaTib for CA_1-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911578 | DeltaTib for CA_1-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911579 | DeltaTib for CA_1-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911580 | Spectrum utilization and new channel bandwidths for n25 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911581 | Transmitter requirement for 35 MHz channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911582 | Receiver requirement for 35 MHz channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911583 | UE emission requirements and NS values for n25 new channel bandwidths | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911584 | Draft CR: Addition of 25, 30, 35 and 40 MHz to NR band n25 in TS 38.104 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911585 | TP to TR 36.716-03-01: CA_1-7-7-20 | Nokia, Nokia Shanghai Bell, Orange | imported from 3GU |
R4‑1911586 | TP to TR 36.716-03-01: CA_3-7-7-20 | Nokia, Nokia Shanghai Bell, Orange | imported from 3GU |
R4‑1911587 | TP to TR 36.716-04-01: CA_1-3-7-7-20 | Nokia, Nokia Shanghai Bell, Orange | imported from 3GU |
R4‑1911588 | TP to TR 36.716-04-01: CA_1-3-7-28 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911589 | TXDC location | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911590 | [draft] Reply LS on Tx DC location | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911591 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911592 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911593 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911594 | Enhanced spherical coverage requirement for FR2 PC3 UE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911595 | Discussion on FR2 inter-band DL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911596 | FR2 inter-band CA band grouping | MediaTek Inc. | imported from 3GU |
R4‑1911597 | n259 PC3 minimum peak EIRP and REFSENS link budgets | MediaTek Inc. | imported from 3GU |
R4‑1911598 | Draft CR for TS 38.101-3: MSD due to cross band isolation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1911599 | TP for TR 37.716-11-11: Self-interference analyses | MediaTek Inc. | imported from 3GU |
R4‑1911600 | Draft CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc. | imported from 3GU |
R4‑1911601 | Revised WID on Dual Connectivity (EN-DC) of 4 bands LTE inter-band CA (4DL/1UL) and 1 NR band (1DL/1UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911602 | TP for 37.716-21-11 to introduce DC_2A-46_n41 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911603 | TP for 37.716-21-11 to introduce DC_2A-46_n71 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911604 | TP for 37.716-21-11 to introduce DC_46-66A_n41 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911605 | TP for 37.716-21-11 to introduce DC_46-66A_n71 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911606 | TP for 37.716-21-21 to introduce DC_2A-66A_n41A-n261 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911607 | TP for 37.716-31-11 to introduce DC_2A-46-66_n41 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911608 | TP for 37.716-31-11 to introduce DC_2A-46-66_n71 | Nokia, Nokia Shanghai Bell, T-Mobile USA | imported from 3GU |
R4‑1911609 | NR-U - Baseline Spectral Emission Mask | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911610 | NR-U - Definition of LBT transmission modes | Nokia, Nokia Shanghai Bell, Skyworks Solutions Inc. | imported from 3GU |
R4‑1911611 | NR-U - Scheduling of guard PRBs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911612 | NR-U -UE ACLR for PC3 and PC5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911613 | n28 supporting 30MHz | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1911614 | [NR-U] UE Power Class Definitions | Skyworks Solutions Inc. | imported from 3GU |
R4‑1911615 | Switching time between NR between FR1 uplink carriers | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1911616 | [NR-U] UE Spectral Mask and ACLR Requirements | Skyworks Solutions Inc. | imported from 3GU |
R4‑1911617 | [NR-U] UE Behavior in Different Wideband Operation Modes | Skyworks Solutions Inc. | imported from 3GU |
R4‑1911618 | Introduction of Inner Allocations for Intra-band Contiguous ENDC and NR UL CA | Skyworks Solutions Inc. | imported from 3GU |
R4‑1911619 | TR38.827 v0.4.0 NR MIMO OTA | CAICT | imported from 3GU |
R4‑1911620 | Draft CR to 38.141-2: OTA transmitter spurious emissions (6.7) | NEC | imported from 3GU |
R4‑1911621 | Draft CR to 38.141-2: OTA receiver spurious emissions (7.7) | NEC | imported from 3GU |
R4‑1911622 | CR to 37.145-2: OTA ACLR R15 (6.7.3) | NEC | imported from 3GU |
R4‑1911623 | CR to 37.145-2: OTA ACLR R16 (6.7.3) | NEC | imported from 3GU |
R4‑1911624 | Draft CR to 38.141-2: OTA ACLR (6.7.3) | NEC | imported from 3GU |
R4‑1911625 | Draft CR to 38.141-2: OTA receiver intermodulation procedure (7.8) | NEC | imported from 3GU |
R4‑1911626 | CR to 38.817-02:In-band and out-of-band boundaries for FR1 (5.10) | NEC | imported from 3GU |
R4‑1911627 | RRM requirements for conditional handover | NEC | imported from 3GU |
R4‑1911628 | Scheduling restriction for CLI measurement | NEC | imported from 3GU |
R4‑1911629 | TCI state known status mismatch handling | NEC | imported from 3GU |
R4‑1911630 | One shot timing adjustment threshold for UE UL timing adjustment | NEC | imported from 3GU |
R4‑1911631 | MR-DC: Direct SCell activation delay requirements | NEC | imported from 3GU |
R4‑1911632 | Discussion on TCLI side condition and measurement accuracy requirements | NEC | imported from 3GU |
R4‑1911633 | Draft CR to 38.133: TCI state known status mismatch handling | NEC | imported from 3GU |
R4‑1911634 | Draft CR on correction of UE transmit timing requirements | NEC | imported from 3GU |
R4‑1911635 | Draft CR on threshold for UE one shot timing adjustment | NEC | imported from 3GU |
R4‑1911636 | NR MIMO OTA Ad-hoc meeting notes | CAICT | imported from 3GU |
R4‑1911637 | WF on NR MIMO OTA | CAICT | imported from 3GU |
R4‑1911638 | IAB-Node coexistence and dynamic range requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911639 | IAB-Node coexistence simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911640 | Frequency error considerations for IAB-Node | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911641 | On IAB-Node specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911642 | TP to TR 38.820: Signal quality considerations for 7-24 GHz base station operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911643 | Draft CR to TS 38.101-3: UL-MIMO on SUL carrier | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911644 | TP to TR 38.883: FR2 DL 256QAM link level simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911645 | Switching period between case 1 and case 2 for two NR FR1 carriers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911646 | UE capability aspects for new NR FDD bands with variable duplex | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911647 | Potential Improvements for Band 41 Intra-band ENDC and Applicability to Other Cases | Skyworks Solutions Inc. | imported from 3GU |
R4‑1911648 | TP to TR 38.827 v0.4.0 on Base Station beamforming configuration | CAICT, SAICT | imported from 3GU |
R4‑1911649 | Discussion on NSA FDD-TDD HPUE SAR solutions | China Unicom | imported from 3GU |
R4‑1911650 | LS on Device Under Test Configuration for OTA Antenna Performance Assessments | GCF-ITAOTA Task Force | imported from 3GU |
R4‑1911651 | draft CR for introduce DC of LTE 1band + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1911652 | TP for TR 37.716-11-11 DC_18_n3 | KDDI | imported from 3GU |
R4‑1911653 | TP for TR 37.716-11-11 DC_28_n3 | KDDI | imported from 3GU |
R4‑1911654 | draft CR for introduce DC of LTE 2bands + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1911655 | draft CR for introduce DC of LTE 3bands + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1911656 | TP for TR 37.716-31-11 DC_1-3-42_n257 | KDDI | imported from 3GU |
R4‑1911657 | TP for TR 37.716-31-11 DC_3-28-41_n78 | KDDI | imported from 3GU |
R4‑1911658 | TP for TR 37.716-31-11 DC_3-28-41_n257 | KDDI | imported from 3GU |
R4‑1911659 | TP for TR 37.716-31-11 DC_28-41-42_n78 | KDDI | imported from 3GU |
R4‑1911660 | TP for TR 37.716-31-11 DC_28-41-42_n257 | KDDI | imported from 3GU |
R4‑1911661 | draft CR for introduce DC of LTE 4bands + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1911662 | TP for TR 37.716-41-11 DC_3-28-41-42_n78 | KDDI | imported from 3GU |
R4‑1911663 | TP for TR 37.716-41-11 DC_3-28-41-42_n257 | KDDI | imported from 3GU |
R4‑1911664 | TP for TR 38.716-03-02 CA_n28A-n77(2A)-n257 | KDDI | imported from 3GU |
R4‑1911665 | Work plan for adding n1 25MHz channel bandwidth | China Unicom | imported from 3GU |
R4‑1911666 | Discussion on A-MPR and addition spurious emissions for n1 25MHz channel bandwidth | China Unicom | imported from 3GU |
R4‑1911667 | UE requirements for switching between 1Tx carrier and 2Tx carrier when configured with SUL | Huawei, HiSilicon | imported from 3GU |
R4‑1911668 | UE requirements for switching between 1Tx carrier and 2Tx carrier when configured with EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1911669 | Views on DL interruptions during UE switching between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1911670 | LS on the UE switching between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1911671 | CR to 38.101-1 on UE requirements for switch between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1911672 | CR to 38.101-3 on UE requirements for switch between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1911673 | Draft CR 38.104 adding Band n1 25MHz channel bandwidth | China Unicom | imported from 3GU |
R4‑1911674 | draft CR to introduce new combinations of LTE 4band + NR 1band for TS 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911675 | draftTR 37.716-41-11 v0.5.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911676 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1911677 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1911678 | TR 36.716-02-01-030 Rel-16 2 Bands DL and 1 Band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1911679 | Update TR scope for LTE inter-band Carrier Aggregation for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1911680 | FR2 UE demodulation and CSI testing methodology | Qualcomm Incorporated | imported from 3GU |
R4‑1911681 | Draft CR on TR38.810 for UE demudulation and CSI testing methodlogy | Qualcomm Incorporated | imported from 3GU |
R4‑1911682 | Environmental conditions for NR FR1 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1911683 | Draft CR for TS38.101-4: Angle of arrival for radiated UE demodulation testing | Qualcomm Incorporated | imported from 3GU |
R4‑1911684 | Views on testability of DL 256QAM for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1911685 | 7 to 24GHz - Discussion on BS ACLR | Huawei | imported from 3GU |
R4‑1911686 | TP to TR 38.820 - BS ALCR | Huawei | imported from 3GU |
R4‑1911687 | 7 to 24GHz - Discussion on BS output power accuracy | Huawei | imported from 3GU |
R4‑1911688 | TP to TR 38.820 - BS output power accuracy | Huawei | imported from 3GU |
R4‑1911689 | 7 to 24GHz - Discussion on BS in-band blocking | Huawei | imported from 3GU |
R4‑1911690 | TP to TR 38.820 - BS in-band blocking | Huawei | imported from 3GU |
R4‑1911691 | 7 to 24GHz - Discussion on receiver sensitivity | Huawei | imported from 3GU |
R4‑1911692 | TP to TR 38.820 - BS receiver sensitivity | Huawei | imported from 3GU |
R4‑1911693 | 7 to 24GHz - Discussion on BS TX IMD | Huawei | imported from 3GU |
R4‑1911694 | TP to TR 38.820 - BS TX IMD | Huawei | imported from 3GU |
R4‑1911695 | 7 to 24GHz - Discussion on TX OFF levels | Huawei | imported from 3GU |
R4‑1911696 | TP to TR 38.820 - BS TX OFF levels | Huawei | imported from 3GU |
R4‑1911697 | Draft CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1911698 | Discuss FR2 IAB-MT blocking | Huawei | imported from 3GU |
R4‑1911699 | Asynchronous operaton for n78_n79 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911700 | Supporting for Intra-band contiguous EN-DC for B42_n78 and B42_n77 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911701 | Correction on NW signnaling achitecture | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911702 | Draft CR for correction on NW signnaling achitecture for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911703 | Draft CR for correction on NW signnaling achitecture for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911704 | Draft CR for MPR CA improvement for FR2 UL CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911705 | draft CR for 2BDL_xBUL(x=1,2) NR CA of FR1+ FR2 for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911706 | draft CR for EN-DC of LTE 2band + NR 1 band for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911707 | draft CR for EN-DC of LTE 3band + NR 1 band for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911708 | draft CR for EN-DC of LTE 4band + NR 1 band for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911709 | TP for CA_n77-n79-n257 for TR 38.716-03-01 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911710 | TP for CA_n77-n79-n257 for TR 38.716-03-02 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911711 | TP for CA_n78-n79-n257 for TR 38.716-03-01 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911712 | TP for CA_n78-n79-n257 for TR 38.716-03-02 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911713 | TP for DC_1-3-42_n257 for TR 37.716-31-11 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911714 | Inter-band CA requirements in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911715 | Power class frame work in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911716 | Discussion of HPUE ENDC FDD+TDD | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911717 | Environmental condition for FR1 MIMO OTA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911718 | Timing Error as side condition for CLI SRS-RSRP measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911719 | Simulation results for timing error impact on CLI measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911720 | RRM Core requirements for CLI SRS-RSRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911721 | CR to 38.133 introduction of Cross Link Interference measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911722 | Multi-band relaxation requirement for n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1911723 | TP to the new TR related to NB-IoT: TDD configurations | ZTE Corporation | imported from 3GU |
R4‑1911724 | Power boosting for NB-IoT coexisting with NR | ZTE Corporation | imported from 3GU |
R4‑1911725 | Further discussion on the TAG misalignment between NB-IoT and NR | ZTE Corporation | imported from 3GU |
R4‑1911726 | TP to the new TR related to NB-IoT: TAG misalignment | ZTE Corporation | imported from 3GU |
R4‑1911727 | Further discussion on the TAG misalignment between LTE-MTC and NR | ZTE Corporation | imported from 3GU |
R4‑1911728 | TP to the new TR related to MTC: TAG misalignment | ZTE Corporation | imported from 3GU |
R4‑1911729 | Discussion on channel raster for NR-U | ZTE Corporation | imported from 3GU |
R4‑1911730 | Discussion on sync raster for NR-U | ZTE Corporation | imported from 3GU |
R4‑1911731 | Discussion on SU for NR-U | ZTE Corporation | imported from 3GU |
R4‑1911732 | Further discussion on NR-U BS RX RF requirement | ZTE Corporation | imported from 3GU |
R4‑1911733 | frequency error requirement for IAB | ZTE Corporation | imported from 3GU |
R4‑1911734 | Discussion on IAB Tx dynamic range requirement | ZTE Corporation | imported from 3GU |
R4‑1911735 | simulation results for FR1 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1911736 | simulation results for FR2 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1911737 | Draft CR to TS38.104: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1911738 | Draft CR to TS38.141-1: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1911739 | Draft CR to TS38.141-2: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1911740 | Discussion on Wgap for Rx requirements in NC operation and multiple bands | ZTE Corporation | imported from 3GU |
R4‑1911741 | Draft CR to TS38.104: Correction on gap size for non-contiguous spectrum or multiple bands for FR1 Rx requirements | ZTE Corporation | imported from 3GU |
R4‑1911742 | Draft CR to TS38.141-1: Correction on gap size for non-contiguous spectrum or multiple bands for FR1 Rx requirements | ZTE Corporation | imported from 3GU |
R4‑1911743 | Draft CR to TS38.141-2: Correction on gap size for non-contiguous spectrum or multiple bands for FR1 Rx requirements | ZTE Corporation | imported from 3GU |
R4‑1911744 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1911745 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1911746 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1911747 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1911748 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2 | ZTE Corporation | imported from 3GU |
R4‑1911749 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2 | ZTE Corporation | imported from 3GU |
R4‑1911750 | Draft CR to TS38.141-1: Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1911751 | Discussion on 5GAA LS | AT&T | imported from 3GU |
R4‑1911752 | TP to TR 37.716-21-21: DC_7A-7A-66A_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1911753 | System-level evaluations for PRS-RSTD and PRS-RSRP | Intel Corporation | imported from 3GU |
R4‑1911754 | Views on FR2 SNR range for CA performance requirements | ROHDE & SCHWARZ | imported from 3GU |
R4‑1911755 | LS on the testability of FR1 Tx diversity | ROHDE & SCHWARZ | imported from 3GU |
R4‑1911756 | CSI-RS based intra-f and inter-f measurements definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911757 | CR to 38.133 CSI-RS based intra-frequency and inter-frequency measurements definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911758 | RRM requirements for CSI-RS based intra-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911759 | Simulation results for CSI-RS based measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911760 | Discussion on UE demodulation requirements for LTE-NR co-existence scenario in TDD | Ericsson | imported from 3GU |
R4‑1911761 | Simulation assumption of UE demodulation requirements for LTE-NR co-existence scenario in TDD | Ericsson | imported from 3GU |
R4‑1911762 | Applicability of FR2 PDSCH demodulation for UE with maximum UL duty cycle | Ericsson | imported from 3GU |
R4‑1911763 | Discussion on NR PDSCH demodulation requirements for HST | Ericsson | imported from 3GU |
R4‑1911764 | RLM for NR HST | Ericsson | imported from 3GU |
R4‑1911765 | L1-RSRP measurements for high speed train scenario | Ericsson | imported from 3GU |
R4‑1911766 | Beam management in NR-U | Ericsson | imported from 3GU |
R4‑1911767 | L1-RSRP measurements in NR-U | Ericsson | imported from 3GU |
R4‑1911768 | SI acquisition in NR-U | Ericsson | imported from 3GU |
R4‑1911769 | Discussion on L1-SINR measurement requirements | Ericsson | imported from 3GU |
R4‑1911770 | Discussion on link recovery procedure for Scell | Ericsson | imported from 3GU |
R4‑1911771 | Discussion on channel quality reporting for NB-IoT | Ericsson | imported from 3GU |
R4‑1911772 | Discussion on channel quality reporting for eMTC | Ericsson | imported from 3GU |
R4‑1911773 | RLM with MPDCCH improvement | Ericsson | imported from 3GU |
R4‑1911774 | RLM for LTE HST | Ericsson | imported from 3GU |
R4‑1911775 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1911776 | Simulation results of PDSCH for HST single tap | Ericsson | imported from 3GU |
R4‑1911777 | Introduction of CA PDSCH demodulation requirements with HST-SFN | Ericsson | imported from 3GU |
R4‑1911778 | Doppler shift evaluation for LTE HST Bidirectional Scenario | Ericsson | imported from 3GU |
R4‑1911779 | Doppler shift evaluation for LTE HST Unidirectional Scenario | Ericsson | imported from 3GU |
R4‑1911780 | Simulation results on NB-IoT NPRACH demodulation performance for TDD | Ericsson | imported from 3GU |
R4‑1911781 | editorial CR for section 8.1,8.8,8.9,8.10,8.11 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911782 | editorial CR for section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911783 | editorial CR for section 9.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911784 | editorial CR for 36133 section 7.6 and 7.31 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911785 | editorial CR for 36133 section 8.1.2.4 and 8.17.4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911786 | Clarification on MRTD and MTTD requirement in LTE NR DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911787 | CR on MRTD and MTTD requirement (7.5, 7.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911788 | SRS configuration in UE transmit timing test cases | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911789 | CR on TC of UE transmit timing (A.4.4.1.1, A.5.4.1.1, A.6.4.1.1, A.7.4.1.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911790 | Interruption requirements with BWP switch on multiple CCs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911791 | 38.133 CR on interruption requirements for BWP switch on multiple CCs (8.2.1.2.7, 8.2.2.2.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911792 | 36.133 CR on interruption requirements for BWP switch on multiple CCs (7.32.2.7, 7.36.2.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911793 | Range of T_delta for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911794 | Discussion on SSB based RRM for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911795 | Discussion on IIoT time synchronization accuracy requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911796 | Draft Response LS on IIoT time synchronization accuracy requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1911797 | TP for TR 37.716-31-11: DC_1A-7A-8A_n78A | Vodafone Ireland Plc | imported from 3GU |
R4‑1911798 | draft CR to TS 38.141-1: Correcting TM 3.3 Definition | Ericsson | imported from 3GU |
R4‑1911799 | draft CR to TS 38.141-2: Adding TM 3.2, TM 3.3 Definition | Ericsson | imported from 3GU |
R4‑1911800 | TP to TR 38.883: BS implementation aspects in subclause 5.3 | Ericsson | imported from 3GU |
R4‑1911801 | TP to TR 38.883: Section 5.2.1 Link level simulation | Ericsson | imported from 3GU |
R4‑1911802 | TP to TR 38.883: Section 5 System level simulation | Ericsson | imported from 3GU |
R4‑1911803 | TP to TR 38.820: Addition of UE noise figure and some other clarifications in subclauses 5.5.1 & 6.3.3.1 | Ericsson | imported from 3GU |
R4‑1911804 | MIMO Capacity Analysis for FR1 2D MPAC | Spirent Communications | imported from 3GU |
R4‑1911805 | Draft CR to TR 38.810: Size of the Quiet Zone | ROHDE & SCHWARZ | imported from 3GU |
R4‑1911806 | TP to TR 36.716-02-01: CA_7-7-20 | Orange | imported from 3GU |
R4‑1911807 | Usage of Tx Beam Lock for FR2 NR MIMO OTA testing | ROHDE & SCHWARZ | imported from 3GU |
R4‑1911808 | NB-IoT - NR coexistence : Power boosting considerations | Ericsson | imported from 3GU |
R4‑1911809 | Draft CR to TS 38.104 - NB-IoT introduction | Ericsson | imported from 3GU |
R4‑1911810 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1911811 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1911812 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1911813 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1911814 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1911815 | BS demodulation - remaining open issues | Ericsson | imported from 3GU |
R4‑1911816 | Band n1 - wider CBW - UE RF REFSENS | Ericsson | imported from 3GU |
R4‑1911817 | Band n1 - wider CBW - UE RF coex spurious and A-MPR | Ericsson | imported from 3GU |
R4‑1911818 | Band n1 - wider CBW - UE A-MPR simulation results | Ericsson | imported from 3GU |
R4‑1911819 | Band n38 - wider CBW - Overview | Ericsson | imported from 3GU |
R4‑1911820 | Band n38 - wider CBW - UE RF REFSENS | Ericsson | imported from 3GU |
R4‑1911821 | Band n38 - wider CBW - UE RF coex spurious and A-MPR | Ericsson | imported from 3GU |
R4‑1911822 | Band n75 - wider CBW - UE RF REFSENS | Ericsson | imported from 3GU |
R4‑1911823 | Band n25 - New channel bandwidth 35MHz | Ericsson | imported from 3GU |
R4‑1911824 | New basket WID to manage requests adding wider CBW support to existing bands | Ericsson | imported from 3GU |
R4‑1911825 | Way forward on the new basket WID - adding wider CBW to existing NR bands | Ericsson | imported from 3GU |
R4‑1911826 | UE transient time reporting capability | Ericsson | imported from 3GU |
R4‑1911827 | Draft CR to TS 38.141-2: Additional information about alignment needed for TRP measurements in Annex I | Ericsson | imported from 3GU |
R4‑1911828 | TP to TR 38.820: PA indicative ACLR values in subclause 5.5.2 | Ericsson | imported from 3GU |
R4‑1911829 | TP to TR 38.820: Parameterized phase noise model in subclause 5.5.3 | Ericsson | imported from 3GU |
R4‑1911830 | TP to TR 38.820: Technical background for phase noise characteristics for different example frequencies in subclause 5.4.4 | Ericsson | imported from 3GU |
R4‑1911831 | Discussion on parameterized phase noise model for example frequencies in 7-24 GHz | Ericsson | imported from 3GU |
R4‑1911832 | TP to TR 38.820: Technical background for BS filter technologies for 7 to 24 GHz in subclause 5.4.5 | Ericsson | imported from 3GU |
R4‑1911833 | TP to TR 38.820: Addition of filter key parameters in subclause 5.5.4 | Ericsson | imported from 3GU |
R4‑1911834 | On co-location spurious emission requirement aspects | Ericsson | imported from 3GU |
R4‑1911835 | TP to TR 38.820: Update of technical background for BS out-of-band blocking in subclause 7.4.2.2 | Ericsson | imported from 3GU |
R4‑1911836 | Overview of references to internal technical reports (TR xx.800 series) in TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1911837 | TP to TR 38.820: Editorial update of draft TR 38.820 | Ericsson | imported from 3GU |
R4‑1911838 | TP to TR 38.820: Improvement of technical background for co-location requirements in subclause 7.4.1.2 | Ericsson | imported from 3GU |
R4‑1911839 | TP to TR 38.820: Improvement of transmitter architecture in subclause 5.3.2 | Ericsson | imported from 3GU |
R4‑1911840 | On base station OTA test aspects in field | Ericsson | imported from 3GU |
R4‑1911841 | CR to TR 37.843: Improvement of RC technical background in subclause 10.5.2.3A | Ericsson | imported from 3GU |
R4‑1911842 | Draft CR to TS 37.145-2: Additional information about alignment needed for TRP measurements in Annex F | Ericsson | imported from 3GU |
R4‑1911843 | TP to TR 38.820: Improvement of example frequency range in subclause 5.2 | Ericsson | imported from 3GU |
R4‑1911844 | TP to TR 38.820: Requirement approach in subclause 7.4.1 and subclause 7.4.2 | Ericsson | imported from 3GU |
R4‑1911845 | Discussion on extending the scope of current NR EMC specification for IAB | Ericsson | imported from 3GU |
R4‑1911846 | Discussion on EMC Requirements for IAB nodes | Ericsson | imported from 3GU |
R4‑1911847 | Draft CR to 38.113 Adding IAB to scope | Ericsson | imported from 3GU |
R4‑1911848 | Draft CR to TS 38.104 to correct limit for TX spurios BS type 1-H | Ericsson | imported from 3GU |
R4‑1911849 | Plane Wave Synthesizer – Pending MU terms | ROHDE & SCHWARZ | imported from 3GU |
R4‑1911850 | Further discussions on Emission Mask Considerations for NR-U DL single wideband carrier operation modes | Charter Communications, Inc | imported from 3GU |
R4‑1911851 | Way forward on RRM requirements of R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1911852 | Discussion on WUS requirements in R16 NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1911853 | Discussion on PUR in R16 NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1911854 | Discussion on the non-anchor RRM measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911855 | CR on non-anchor RRM measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911856 | Discussion on quality reporting on non-anchor carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1911857 | CR on requirements for msg3 based quality reporting on non-anchor carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1911858 | CR on requirements for connected mode quality reporting | Huawei, HiSilicon | imported from 3GU |
R4‑1911859 | Correction on the BWP switch TCI state before MAC activation (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1911860 | CR on cell-reselection test cases for NR SA FR2 (A.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911861 | CR on intra-frequency measurement and reporting for EN-DC FR2 (A.5.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911862 | CR on intra-frequency measurement and reporting for NR SA FR2 (A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911863 | CR on inter-frequency measurement and reporting for EN-DC FR2 (A.5.6.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911864 | CR on inter-frequency measurement and reporting for NR SA FR2 (A.7.6.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911865 | CR on RLM scheduling restrictions for EN-DC FR2 (A.5.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1911866 | CR on RLM scheduling restrictions for NR SA FR2 (A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1911867 | CR on test case in A.4.7.2.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1911868 | discussion on the timing alignment OTA for IAB system | Huawei, HiSilicon | imported from 3GU |
R4‑1911869 | reply LS on the T_delta range for IAB | Huawei, HiSilicon | imported from 3GU |
R4‑1911870 | discussion on the BWP switch TCI state before MAC activation in R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1911871 | CR on BWP switch TCI state before MAC activation | Huawei, HiSilicon | imported from 3GU |
R4‑1911872 | discussion on the R16 BWP switch requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911873 | Way forward on the R16 BWP switch RRM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911874 | Correction on requirements applicability for inter-RAT NR measurements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911875 | Correction on requirement applicability for intra-NR RRM measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1911876 | Correction on the TCI state switching (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1911877 | Correction on E-UTRA inter-frequency measurements in ENDC R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911878 | Correction on E-UTRA inter-frequency measurements in ENDC R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1911879 | Discussion on second SMTC periodicity in idle mode | Huawei, HiSilicon | imported from 3GU |
R4‑1911880 | Reply LS on on second SMTC periodicity in idle mode | Huawei, HiSilicon | imported from 3GU |
R4‑1911881 | Editorial CR on idle mode in TS 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911882 | Editorial CR on idle mode in TS 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1911883 | Correction of interruption requirements in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911884 | Correction of interruption requirements in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1911885 | Discussion on the RRM impact on power saving | Huawei, HiSilicon | imported from 3GU |
R4‑1911886 | Disucssion on RRM requirements for MIMO layers adaption | Huawei, HiSilicon | imported from 3GU |
R4‑1911887 | Discussion on the RRM impact on HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911888 | Preliminary link level simulation results for HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911889 | Discussion on uplink timing adjustment in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911890 | Link level simulation assumption on cell identification in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911891 | Link level simulation assumption on measurement accuracy in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911892 | On RRM requirement of SRS carrier switching requirements for NR SA, NR-DC, EN-DC and NE-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1911893 | Discussion on mandatory gap pattern in R-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1911894 | CR on UMTS inter-RAT measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911895 | CR on CSSF for SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1911896 | CR on handover requirements for SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1911897 | Discussion on CSI-RS based L3 measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911898 | Discussion on CSI-RS based intra-frequency measurement definition | Huawei, HiSilicon | imported from 3GU |
R4‑1911899 | [DRAFT] Reply LS on clarification about CSI-RS measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911900 | Discussion on handover delay for conditional handover in feMobility | Huawei, HiSilicon | imported from 3GU |
R4‑1911901 | Discussion on RRM requirements for reduction of user data interruption in femobility | Huawei, HiSilicon | imported from 3GU |
R4‑1911902 | Way forward on feMob in LTE R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1911903 | Adding the IE flag in R16 HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911904 | Test case list for R16 HST | Huawei, HiSilicon | imported from 3GU |
R4‑1911905 | Discussion on remaining issues on UE one-shot timing adjustment requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911906 | Draft CR on correcting one-shot timing adjustment requirements in TS38.133 (section 7.1.2.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911907 | DraftCR on interruption requirements due to one-shot timing adjustment (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911908 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.3 and A.4.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911909 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 (section A.6.5.5.3 and A.6.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911910 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.3 and A.5.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911911 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 (section A.7.5.5.3 and A.7.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911912 | Discussion on RRM impacts for LTE-based 5G Terrestrial Broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1911913 | Further discussion on DAPS-based HO NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1911914 | Futher discussion on CHO for NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1911915 | Initial simulation results of SyncRef UE identification for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1911916 | Discussion on synchronization related requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1911917 | Discussion on measurement requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1911918 | Discussion on interruption requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1911919 | Discussion on L1-SINR measurements for NR eMIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1911920 | Discussion on SCell BFR measurements for NR eMIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1911921 | Discussion on CSI-RS based measurement performance for NR mobility | Huawei, HiSilicon | imported from 3GU |
R4‑1911922 | Correction on inter-frequency RSTD measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911923 | Correction on inter-frequency RSTD measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911924 | Correction on CSSF within measurement gap (section 9.1.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911925 | Cell re-selection requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911926 | Discussion on Active BWP switching requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911927 | Discussion HO requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911928 | Discussion on measurement requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911929 | Discussion on PSCell Addition in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911930 | Discussion on RLM in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911931 | Discussion on RRC Re-establishment in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911932 | Discussion on RRC Release with Redirection in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911933 | Serving Cell Measurement Requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911934 | Way forward on RRM requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1911935 | Correction on delay uncertainty of RRC Release with redirection requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911936 | Correction on known condition of PSCell addition requirement in NE-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1911937 | Correction on known condition of PSCell addition requirement in NR DC | Huawei, HiSilicon | imported from 3GU |
R4‑1911938 | Correction on RRC Re-establishment requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911939 | Correction on scope of interruption requirements of EN-DC in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911940 | Correction on scope of MTTD requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911941 | Correction on SSB-based RLM test case for EN-DC FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1911942 | Correction on SSB-based RLM test case for NR SA FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1911943 | DraftCR on NR handover requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911944 | Editorial CR on section 8.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1911945 | Discussion on FR2 measurement outside gap | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1911946 | CR on FR2 measurement requriements outside gaps (section 9.1.5.1) | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1911947 | CR on applicability of inter-frequency SFTD measurement (section 9.1.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911948 | CR on RLM scheduling restriction (section 8.1.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1911949 | CR on SCell activation requirements (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1911950 | Discussion on definition of QCL | Huawei, HiSilicon | imported from 3GU |
R4‑1911951 | CR to add QCL definition (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1911952 | On CSI-RS measurement for beam management in DRX | Huawei, HiSilicon | imported from 3GU |
R4‑1911953 | [draft] LS on CSI-RS measurement outside DRX active time | Huawei, HiSilicon | imported from 3GU |
R4‑1911954 | Maintenance CR for measurement accuracy (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911955 | Discussion on remaining issues in FR2 RRM test setup | Huawei, HiSilicon | imported from 3GU |
R4‑1911956 | L1-RSRP delay test FR1 EN-DC (section A.4.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1911957 | L1-RSRP delay test FR1 SA (section A.6.6.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911958 | L1-RSRP delay test FR2 EN-DC (section A.5.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1911959 | L1-RSRP delay test FR2 SA (section A.7.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1911960 | L1-RSRP accuracy test FR2 EN-DC (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911961 | L1-RSRP accuracy test FR2 SA (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1911962 | inter-frequency RSRP accuracy test FR2 EN-DC (section A.5.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911963 | inter-frequency RSRP accuracy test FR2 SA (section A.7.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911964 | FR1 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911965 | FR1 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911966 | FR2 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911967 | FR2 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911968 | Discussion on timing error in CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911969 | Discussion on remaining issues in CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911970 | CR to introduce CLI measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911971 | CR to introduce CLI measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911972 | Discussion on RRM impacts for asynchronous NR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1911973 | Discussion on early measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911974 | Discussion on direct Scell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1911975 | Introducing euCA related interruption requirements for EN-DC in 38.133 (section 8.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1911976 | Introducing euCA related interruption requirements for NE-DC in 38.133 (section 8.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1911977 | Introducing euCA related interruption requirements for EN-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911978 | Introducing euCA related interruption requirements for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1911979 | Discussion on PRS measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911980 | Discussion on reference point for timing related measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911981 | [draft] reply LS on Reference Point for Timing Related Measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1911982 | Initial system level simulation results for NR positioning | Huawei, HiSilicon | imported from 3GU |
R4‑1911983 | Discussion on RLF prevention mechanism for URLLC | Huawei, HiSilicon | imported from 3GU |
R4‑1911984 | On synchronization assumption for CSI-RS measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911985 | On CSI-RS measurement capability | Huawei, HiSilicon | imported from 3GU |
R4‑1911986 | Initial discussion on multiple SCell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1911987 | Initial discussion on CGI reading requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1911988 | Discussion on intra-frequency SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911989 | [draft] Reply LS to RAN2 on SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911990 | Discussion on definition of SFTD measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1911991 | [draft] Reply LS to RAN1 on SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911992 | CR on definition of intra-freqeuncy measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1911993 | Correction to direct Scell activation requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911994 | Correction to direct Scell activation during HO requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911995 | Adding interruption length requirements for direct Scell activation R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911996 | Adding RRM measurement requriements for dormant Scell R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911997 | Update to interruption requirements due to measurement on dormant Scell R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911998 | Adding interruption length requirements for dormant state transition R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1911999 | Discussion on quality reporting in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1912000 | CR on quality reporting in Msg3 | Huawei, HiSilicon | imported from 3GU |
R4‑1912001 | Discussion on MWUS requirements in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1912002 | Discussion on PUR in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1912003 | [draft] LS on thresholds for serving cell RSRP change based TA validation in PUR | Huawei, HiSilicon | imported from 3GU |
R4‑1912004 | Discussion on RSS measurement in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1912005 | WF on Rel-16 eMTC RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1912006 | CR to TR 37.843: Completion of MU terms for PWS. | ROHDE & SCHWARZ | imported from 3GU |
R4‑1912007 | Views on FR2 test method enhancement | ROHDE & SCHWARZ | imported from 3GU |
R4‑1912008 | Coexistence simulation results updates for FR2 - layout 1 | Ericsson | imported from 3GU |
R4‑1912009 | Coexistence simulation results for FR1 - layout 1 | Ericsson | imported from 3GU |
R4‑1912010 | Coexistence simulation results for FR2 - layout 2 | Ericsson | imported from 3GU |
R4‑1912011 | Coexistence simulation results for FR1 - layout 2 | Ericsson | imported from 3GU |
R4‑1912012 | RF impact analysis on the SDM/FDM operation for IAB node | Ericsson | imported from 3GU |
R4‑1912013 | On beam related requirement of IAB node | Ericsson | imported from 3GU |
R4‑1912014 | IAB Tx dynamic range | Ericsson | imported from 3GU |
R4‑1912015 | On IAB Pcmax | Ericsson | imported from 3GU |
R4‑1912016 | channel raster design of Rel-16 NR-U for 5GHz band | Ericsson | imported from 3GU |
R4‑1912017 | SSB raster design of Rel-16 NR-U for 5GHz band | Ericsson | imported from 3GU |
R4‑1912018 | WF on SSB raster and channel raster | Ericsson | imported from 3GU |
R4‑1912019 | LS to RAN1 regarding the SSB raster on channel edge | Ericsson | imported from 3GU |
R4‑1912020 | TAG issue for LTE-M coexisting with NR | Ericsson | imported from 3GU |
R4‑1912021 | TR 37.823 LTE-M coexisting with NR v 0.2.0 | Ericsson | imported from 3GU |
R4‑1912022 | Draft CR: Receiver beam peak direction definition update | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912023 | EVM annex: correction for number of frames in averaging | Futurewei | imported from 3GU |
R4‑1912024 | Corrections to EVM 38.141-1 Annex H.7 | Futurewei | imported from 3GU |
R4‑1912025 | Corrections to EVM 38.141-2 Annex L.7 | Futurewei | imported from 3GU |
R4‑1912026 | Frame averaging for EVM Annex B and C in TS 38.104 | Futurewei | imported from 3GU |
R4‑1912027 | EVM example corrections in 38.141-2 | Futurewei | imported from 3GU |
R4‑1912028 | Corrections to EVM 38.141-2 Annex L.4 | Futurewei | imported from 3GU |
R4‑1912029 | Modulation fallback for total power dynamic range in 37.145-1 clause 6.3.4.4.1.4 | Futurewei | imported from 3GU |
R4‑1912030 | Modulation fallback for total power dynamic range in 37.145-2 clause 6.4.4.4.2.4 | Futurewei | imported from 3GU |
R4‑1912031 | Discussion of system parameters for 7-24 GHz study | Futurewei | imported from 3GU |
R4‑1912032 | TP to TR 38.820: system parameters for 7-24 GHz study | Futurewei | imported from 3GU |
R4‑1912033 | Evaluation of Low Band Performance using MARSS (SIR-Based Metric) versus TRMS | PCTEST Engineering Lab | imported from 3GU |
R4‑1912034 | High SINR test in SS-RSRP accuracy testing | Ericsson | imported from 3GU |
R4‑1912035 | Antenna gain range for NR RRM tests | Ericsson | imported from 3GU |
R4‑1912036 | OTA test case configuration for SS-RSRQ and SS-SINR accuracy | Ericsson | imported from 3GU |
R4‑1912037 | Editorial corrections to measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1912038 | Addition of high SNR phase in EN-DC SS-RSRP accuracy tests | Ericsson | imported from 3GU |
R4‑1912039 | Addition of high SNR phase in SA SS-RSRP accuracy tests | Ericsson | imported from 3GU |
R4‑1912040 | Corrections to SS-RSRQ and SS-SINR OTA tests with SA | Ericsson | imported from 3GU |
R4‑1912041 | Corrections to SS-RSRQ and SS-SINR OTA tests with EN-DC | Ericsson | imported from 3GU |
R4‑1912042 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1912043 | Conditional handover requirement for NR | Ericsson | imported from 3GU |
R4‑1912044 | RRM considerations on reduced interruption HO with simultaneous RX/TX to source and target cell | Ericsson | imported from 3GU |
R4‑1912045 | Requirements for conditional handover in NR | Ericsson | imported from 3GU |
R4‑1912046 | CSSF scaling for NR-U | Ericsson | imported from 3GU |
R4‑1912047 | Way forward on RRM specifications for NR-U | Ericsson | imported from 3GU |
R4‑1912048 | Independent gap pattern for NR-U measurements | Ericsson | imported from 3GU |
R4‑1912049 | Interruption requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912050 | Specification structure for NR-U | Ericsson | imported from 3GU |
R4‑1912051 | Outline specification structure for 36.133 and 38.133 NR-U requirements | Ericsson | imported from 3GU |
R4‑1912052 | References for SRVCC | Ericsson | imported from 3GU |
R4‑1912053 | Introduction of measurement gap applicability and sharing for SRVCC in section 9.1.2 | Ericsson | imported from 3GU |
R4‑1912054 | Introduction of handover requirements for SRVCC in section 9.1.2 | Ericsson | imported from 3GU |
R4‑1912055 | Introduction of measurement accuracy requirements for SRVCC in section 10.3 | Ericsson | imported from 3GU |
R4‑1912056 | Introduction of measurement requirements for SRVCC in section 9.4.6 | Ericsson | imported from 3GU |
R4‑1912057 | Introduction of measurement capability for SRVCC in section 9.1.3 | Ericsson | imported from 3GU |
R4‑1912058 | High speed requirements for NR RRM | Ericsson | imported from 3GU |
R4‑1912059 | LTE CGI reading with autononous gaps with an NR serving cell | Ericsson | imported from 3GU |
R4‑1912060 | NR CGI reading with autonomous gaps | Ericsson | imported from 3GU |
R4‑1912061 | Mandatory gap patterns in NR RRM enhancement | Ericsson | imported from 3GU |
R4‑1912062 | LS to RAN2 on mandatory gap patterns for release 16 | Ericsson | imported from 3GU |
R4‑1912063 | Correction of TBD in high speed idle PCell requirements | Ericsson | imported from 3GU |
R4‑1912064 | Correction of TBD in PCell further enhanced high speed requirements | Ericsson | imported from 3GU |
R4‑1912065 | Correction of TBD in high speed SCell requirements | Ericsson | imported from 3GU |
R4‑1912066 | Correction of TBD in further enhanced high speed accuracy requirements | Ericsson | imported from 3GU |
R4‑1912067 | Requirements for conditional handover in LTE | Ericsson | imported from 3GU |
R4‑1912068 | Conditional handover requirement for LTE | Ericsson | imported from 3GU |
R4‑1912069 | LTE simultaneous RX/TX in handover | Ericsson | imported from 3GU |
R4‑1912070 | Editorial updates (section 9.4) | Ericsson | imported from 3GU |
R4‑1912071 | Correction in interruption requirements (section 8.2) | Ericsson | imported from 3GU |
R4‑1912072 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1912073 | Editorial updates (36.133, section 8.19) | Ericsson | imported from 3GU |
R4‑1912074 | Editorial updates (36.133, section 8.19) | Ericsson | imported from 3GU |
R4‑1912075 | On reference point for UE timing related measurements | Ericsson | imported from 3GU |
R4‑1912076 | On reference point for base station timing related measurements | Ericsson | imported from 3GU |
R4‑1912077 | Response LS on reference point for UE timing related measurements | Ericsson | imported from 3GU |
R4‑1912078 | Response LS on reference point for base station timing related measurements | Ericsson | imported from 3GU |
R4‑1912079 | System-level simulation results for NR RSTD | Ericsson | imported from 3GU |
R4‑1912080 | UE measurements for NR positioning | Ericsson | imported from 3GU |
R4‑1912081 | On early measurements reporting in NR | Ericsson | imported from 3GU |
R4‑1912082 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912083 | On RSSI and channel occupancy in NR-U | Ericsson | imported from 3GU |
R4‑1912084 | On active TCI state switching in NR-U | Ericsson | imported from 3GU |
R4‑1912085 | On SCell activation delay in NR-U | Ericsson | imported from 3GU |
R4‑1912086 | On PSCell addition delay in NR-U | Ericsson | imported from 3GU |
R4‑1912087 | On RLM in NR-U | Ericsson | imported from 3GU |
R4‑1912088 | Impact of UL LBT on reporting in NR-U | Ericsson | imported from 3GU |
R4‑1912089 | On intra-frequency measurements in NR-U | Ericsson | imported from 3GU |
R4‑1912090 | On inter-frequency measurements in NR-U | Ericsson | imported from 3GU |
R4‑1912091 | On UE measurement capability for NR-U | Ericsson | imported from 3GU |
R4‑1912092 | On reporting criteria for NR-U | Ericsson | imported from 3GU |
R4‑1912093 | On NR HST scenarios and configurations applicable for RRM requirements | Ericsson | imported from 3GU |
R4‑1912094 | On RRM requirements with SRS carrier based switching in NR | Ericsson | imported from 3GU |
R4‑1912095 | Interruptions requirements with SRS carrier based switching in 38.133 | Ericsson | imported from 3GU |
R4‑1912096 | Interruptions requirements with SRS carrier based switching in 36.133 | Ericsson | imported from 3GU |
R4‑1912097 | On Quiet Zone Sizes for PC3 Devices | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912098 | Reference Measurement Channels for NR FR1 MIMO OTA | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912099 | Range Length Requirement for NR FR1 MIMO RTS Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912100 | Weighted RMS Correlation Error for NR FR1: Option 6 | Keysight Technologies UK Ltd, Spirent Communications | imported from 3GU |
R4‑1912101 | Minimum Range Length for NR FR1 2D MPAC | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912102 | Weighted RMS Correlation Error for LTE MPAC Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912103 | Weighted RMS Correlation Errors for NR FR1 2D MPAC | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912104 | End-to-end system simulations for different probe configurations | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912105 | System Implementation of FR2 3D MPAC Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912106 | On Relaxation of Low UL and High DL Test Cases | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912107 | On Minimizing Impact of Polarization Basis Mismatch | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912108 | On Test Time Reduction for NR FR2 UE Test Cases | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1912109 | Transmitter Characteristics of UE | NXP Semiconductors Netherlands | imported from 3GU |
R4‑1912110 | Correction RAN4 requirements for a Dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912111 | Measurements interruption requirements for an SCell in Dormant state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912112 | Correction to interruption requirement introduction to include dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912113 | Removal of brackets from section 7.7.18 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912114 | Removal of brackets from section 7.7.19 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912115 | Removal of brackets from euCA performance requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912116 | Correction to test case A.8.16.104 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912117 | S-measure threshold applicability in euCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912118 | Correction to S-measure threshold applicability in IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912119 | CHO interruption time for LTE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912120 | CR Introduction of handover delay requirements for conditional handover (section 5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912121 | Introduction of NR Inter-RAT measurements for early measurement reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912122 | Introduction of NR Inter-RAT measurement for Idle Mode CA measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912123 | Early Measurements and reporting in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912124 | LS discussion related to fast SCell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912125 | Reply LS on NR fast SCell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912126 | CHO interruption time for NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912127 | CR Introduction of handover delay requirements for conditional handover (section 6.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912128 | UE switching and interruption times for dynamic MIMO layer adaptations in UE Power Saving schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912129 | UE switching and interruption times for dynamic MIMO layer adaptations in UE Power Saving schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912130 | UE core requirements for UE power saving | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912131 | Requirements for MIMO layer adaptions using BWP switch delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912132 | LS on number of UE receive antennas | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912133 | Mandatory Measurement Gap Patterns | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912134 | Inter-frequency measurement requirement without MG | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912135 | One shot timing adjustment requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912136 | Updating measurement of intra-frequency NR cells with Srxlev = SIntraSearchP or Squal = SIntraSearchQ, threshold | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912137 | Discussion on second SMTC periodicity in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912138 | Reply LS on second SMTC periodicity in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912139 | Discussions on IDLE mode cell re-selection requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1912140 | Discussions on serving cell requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1912141 | Discussions on handover requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912142 | Discussions on paging interruptions for NR-U | Ericsson | imported from 3GU |
R4‑1912143 | RSS based measurement simulation results and discussions | Ericsson | imported from 3GU |
R4‑1912144 | Remaining discussions transmission using PUR for MTC | Ericsson | imported from 3GU |
R4‑1912145 | [Draft] LS about range and resolution of the thresholds for validating the TA for PUR | Ericsson | imported from 3GU |
R4‑1912146 | Discussions on Rel-16 WUS for Rel-16 MTC | Ericsson | imported from 3GU |
R4‑1912147 | Way forward on Rel-16 MTC RRM enhancement | Ericsson | imported from 3GU |
R4‑1912148 | Remaining discussions on RRM requirements for NB-IoT PUR | Ericsson | imported from 3GU |
R4‑1912149 | Remaining discussions on non-anchor carrier RRM measurements | Ericsson | imported from 3GU |
R4‑1912150 | Discussions on Rel-16 WUS for Rel-16 NB-IoT | Ericsson | imported from 3GU |
R4‑1912151 | Discussions on RRM impact of NR UE power saving | Ericsson | imported from 3GU |
R4‑1912152 | Discussions related to interruptions requirements for NR SL V2X | Ericsson | imported from 3GU |
R4‑1912153 | Discussion on simultaneous SL and UL operation | Ericsson | imported from 3GU |
R4‑1912154 | Discussion on timing and synchronization source selection for NR SL V2X | Ericsson | imported from 3GU |
R4‑1912155 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1912156 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1912157 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1912158 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1912159 | Proposed new requirements for 30% throughput testing | Ericsson | imported from 3GU |
R4‑1912160 | Draft CR to TS 38.104: Introduction of PUSCH requirements at 30% throughput point | Ericsson | imported from 3GU |
R4‑1912161 | Draft CR to TS 38.141-1: Introduction of PUSCH requirements at 30% throughput point | Ericsson | imported from 3GU |
R4‑1912162 | Draft CR to TS 38.141-2: Introduction of PUSCH requirements at 30% throughput point | Ericsson | imported from 3GU |
R4‑1912163 | On URLLC ultra reliability testing at low BLER | Ericsson | imported from 3GU |
R4‑1912164 | On URLLC prioritization for demod requirements | Ericsson | imported from 3GU |
R4‑1912165 | Discussion on BS type 2-O PUSCH demodulation requirements with TBD and near 20dB SNR | Ericsson | imported from 3GU |
R4‑1912166 | Draft CR to TS 38.104: BS 2-O PUSCH demodulation with transform precoding disabled | Ericsson | imported from 3GU |
R4‑1912167 | Discussion on general issues on the requirements for NR PUSCH HST demodulations | Ericsson | imported from 3GU |
R4‑1912168 | Initial simulation results for Rel-16 NR HST PUSCH demodulation performance at UE speed of 350 km/h | Ericsson | imported from 3GU |
R4‑1912169 | Discussion on NR PUSCH UL Timing Adjustment | Ericsson | imported from 3GU |
R4‑1912170 | Discussion on maximum Doppler shifts required for NR HST PUSCH demodulation requirements for 500 km/h | Ericsson | imported from 3GU |
R4‑1912171 | Discussion on front-loaded DM-RS symbol for NR HST PUSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1912172 | Discussion on DM-RS based FOE and PT-RS based FOE for HST scenarios at 500 km/h for NR PUSCH demodulation performance | Ericsson | imported from 3GU |
R4‑1912173 | On the PRACH HST BS demod test assumptions | Ericsson | imported from 3GU |
R4‑1912174 | Simulation results for PRACH HST scenarios with speed at 350km per hour and some relevant discussion | Ericsson | imported from 3GU |
R4‑1912175 | Testing of propagation delay compensation for reference time information delivery | Qualcomm Incorporated | imported from 3GU |
R4‑1912176 | Number of bands and CCs to be considered in Rel-16 NR-U WI | Ericsson | imported from 3GU |
R4‑1912177 | On timing reference cell adaptation under DL LBT failure in reference cell | Ericsson | imported from 3GU |
R4‑1912178 | UE transmit timing accuracy under DL LBT failure | Ericsson | imported from 3GU |
R4‑1912179 | Discussion on LS from RAN1 on “propagation delay configurations for IIoT applications” | Ericsson | imported from 3GU |
R4‑1912180 | Removing editorial notes on MTTD for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1912181 | MRTD and MTTD requirements for asynchronous NR-NR DC | Ericsson | imported from 3GU |
R4‑1912182 | WF for Introduction of band n259 WI | Ericsson | imported from 3GU |
R4‑1912183 | updated draft TR 38.887 on introduction of band n259 | Ericsson | imported from 3GU |
R4‑1912184 | BS specific RF requirements for Band n259 | Ericsson | imported from 3GU |
R4‑1912185 | CR to 38.101-3 on uplink power control for non synchronous NR-DC between FR1 and FR2 | Ericsson | imported from 3GU |
R4‑1912186 | draftCR to 38.101-3 on only synchronous NR-DC between FR1 and FR2 support in Rel-15 | Ericsson | imported from 3GU |
R4‑1912187 | TP to TR 38.887 on band plan for Band n259 | Ericsson | imported from 3GU |
R4‑1912188 | Parameters for PMI reporting requirements with larger number of Tx ports | Qualcomm Incorporated | imported from 3GU |
R4‑1912189 | Discussion on second SMTC periodicity in idle mode | Huawei, HiSilicon | imported from 3GU |
R4‑1912190 | Reply LS on on second SMTC periodicity in idle mode | Huawei, HiSilicon | imported from 3GU |
R4‑1912191 | Views on NR V2X S-SSB and PSFCH | Intel Corporation | imported from 3GU |
R4‑1912192 | Editorial change on reference PDCCH payload size | Ericsson | imported from 3GU |
R4‑1912193 | Evaluation of PDCCH under HST scenario | Ericsson | imported from 3GU |
R4‑1912194 | HST PDSCH Single tap results | Ericsson | imported from 3GU |
R4‑1912195 | PMI simulations for 16 and 32 ports | Ericsson | imported from 3GU |
R4‑1912196 | Correction to conditions in RRC re-restablishment requirement in NR | Ericsson | imported from 3GU |
R4‑1912197 | Further analysis of one shot timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1912198 | Threshold for one shot UE timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1912199 | Futher analysis of OTA timing alignment for IAB | Ericsson | imported from 3GU |
R4‑1912200 | LS Response on Max/Min T_delta values for OTA timing alignment for IAB | Ericsson | imported from 3GU |
R4‑1912201 | Further analysis of RRM Requirement for IAB | Ericsson | imported from 3GU |
R4‑1912202 | Maximum CCA failures in RRC re-establishment requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912203 | Maximum CCA failures in RRC redirection requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912204 | Further analysis of active BWP switching in NR-U | Ericsson | imported from 3GU |
R4‑1912205 | UE Transmit Timing under HST in NR | Ericsson | imported from 3GU |
R4‑1912206 | BWP switching delay on due to BWP switching on multiple CCs | Ericsson | imported from 3GU |
R4‑1912207 | Interruption due to BWP switching on multiple CCs | Ericsson | imported from 3GU |
R4‑1912208 | TR 38.820, v0.3.0: implementation of TPs from RAN4#92bis | Huawei | imported from 3GU |
R4‑1912209 | TP to TR 38.820: cleanup | Huawei | imported from 3GU |
R4‑1912210 | Status update on the 7 - 24 GHz SI work progress and timeline | Huawei | imported from 3GU |
R4‑1912211 | TP to TR 38.820: "FR1-like" and "FR2-like" terminology | Huawei | imported from 3GU |
R4‑1912212 | TP to TR 38.820: on Tx requirements applicability | Huawei | imported from 3GU |
R4‑1912213 | TP to TR 38.820: on Rx requirements applicability | Huawei | imported from 3GU |
R4‑1912214 | NR BS output power dynamics for 7-24 GHz range | Huawei | imported from 3GU |
R4‑1912215 | TP to TR 38.820: output power dynamics | Huawei | imported from 3GU |
R4‑1912216 | NR BS transmitted signal quality requirements for 7-24 GHz range | Huawei | imported from 3GU |
R4‑1912217 | TP to TR 38.820: NR BS transmitted signal quality requirements | Huawei | imported from 3GU |
R4‑1912218 | TP to TR 38.820: occupied bandwidth | Huawei | imported from 3GU |
R4‑1912219 | NR BS dynamic range for 7-24 GHz range | Huawei | imported from 3GU |
R4‑1912220 | TP to TR 38.820: NR BS dynamic range | Huawei | imported from 3GU |
R4‑1912221 | NR BS in-channel selectivity for 7-24 GHz range | Huawei | imported from 3GU |
R4‑1912222 | Draft CR to TS 37.145-2: correction of the direction to be tested for the BS demodulation requirements | Huawei | imported from 3GU |
R4‑1912223 | Draft CR to TR 38.817-02: terminology corrections | Huawei | imported from 3GU |
R4‑1912224 | DraftCR to TS 38.104: OTA frequency error requirement simplification | Huawei | imported from 3GU |
R4‑1912225 | DraftCR to TS 38.104: OTA TAE correction | Huawei | imported from 3GU |
R4‑1912226 | Further discussion on the references to internal TRs | Huawei | imported from 3GU |
R4‑1912227 | Draft CR to TS 38.141-1: removal of [] for multiple requirements | Huawei | imported from 3GU |
R4‑1912228 | Draft CR to TS 38.141-2: correction of the multipath fading reference for BS demodulation requirements | Huawei | imported from 3GU |
R4‑1912229 | Revised WID Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1912230 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1912231 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1912232 | Revised WID 4 bands NR CA Rel-16 | Ericsson | imported from 3GU |
R4‑1912233 | TR 36.716-01-01 v0.5.0 Rel-16 LTE Intra-band | Ericsson | imported from 3GU |
R4‑1912234 | TR 38.716-01-01 v0.7.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1912235 | TR 37.716-31-11 v0.7.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1912236 | TP for TR 38.716-01-01 for updated scope from RAN #85 | Ericsson | imported from 3GU |
R4‑1912237 | TP for TR 37.716-31-11 for updated scope from RAN #85 | Ericsson | imported from 3GU |
R4‑1912238 | TP for TR 38.716-04-01 for updated scope from RAN #85 | Ericsson | imported from 3GU |
R4‑1912239 | draft CR introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1912240 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1912241 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1912242 | draft CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1912243 | draft CR introduction completed band combinations 38.716-04-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1912244 | draft Rel-16 CR 38.101-2 for editorial corrections | Ericsson | imported from 3GU |
R4‑1912245 | draft Rel-16 CR 38.101-3 to correct MSD values for DC_3_n7 | Ericsson | imported from 3GU |
R4‑1912246 | TP for TR 37.716-11-11 to include DC_20_n7 | Ericsson | imported from 3GU |
R4‑1912247 | TP for TR 37.716-11-11 to include DC_20_n38 | Ericsson, Swisscom | imported from 3GU |
R4‑1912248 | TP for TR 37.716-21-11 to include DC_1-3_n38 | Ericsson, Swisscom | imported from 3GU |
R4‑1912249 | TP for TR 37.716-21-11 to include DC_3-20_n38 | Ericsson, Swisscom | imported from 3GU |
R4‑1912250 | TP for TR 37.716-21-11 to include DC_1-7_n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1912251 | TP for TR 37.716-21-11 to include DC_1-20_n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1912252 | TP for TR 37.716-21-11 to include DC_7-20_n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1912253 | TP for TR 38.716-02-00 to include CA_n1-n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1912254 | TP for TR 38.716-03-01 to include CA_n1-n3-n8 | Ericsson, Swisscom | imported from 3GU |
R4‑1912255 | TP for TR 38.716-03-01 to conclude CA_n1-n3-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1912256 | TP for TR 38.716-03-01 to include CA_n1-n8-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1912257 | TP for TR 38.716-03-01 to include CA_n1-n3-n28 | Ericsson, Swisscom | imported from 3GU |
R4‑1912258 | TP for TR 38.716-03-01 to include CA_n1-n28-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1912259 | TP for TR 38.716-03-01 to include CA_n3-n28-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1912260 | TP for TR 38.716-04-01 to include CA_n1-n3-n8-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1912261 | TP for TR 38.716-04-01 to include CA_n1-n3-n28-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1912262 | TP for TR 37.716-31-11 to include DC_2-13-66-n260 | Ericsson, Verizon | imported from 3GU |
R4‑1912263 | TP for TR 37.716-31-11 to include DC_2-13-66-n261 | Ericsson, Verizon | imported from 3GU |
R4‑1912264 | draft Rel-16 CR to 38.101-2 to add non-contiguous FR2 Intra-band CA configurations | Ericsson, Verizon | imported from 3GU |
R4‑1912265 | draft Rel-16 CR to 38.101-2 to add CA_n258 configurations | Ericsson, T-Mobile | imported from 3GU |
R4‑1912266 | draft Rel-16 CR to 38.101-3 to add DC configurations for 2_n71 and 2_n41 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912267 | draft Rel-16 CR to 38.101-3 to add DC configurations for 2_n258 and 66_n258 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912268 | draft Rel-16 CR to 38.101-3 to add DC configurations for 2-66_n71 and 2-66_n41 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912269 | TP for TR 37.716-21-11 to include DC_2-46_n258 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912270 | TP for TR 37.716-21-11 to include DC_46A-66A_n258A | Ericsson, T-Mobile | imported from 3GU |
R4‑1912271 | TP for TR 37.716-21-21 to include DC_2_n41-n71 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912272 | TP for TR 37.716-21-21 to include DC_66_n41-n71 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912273 | TP for TR 37.716-21-21 to include DC_2-66_n41-n71 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912274 | TP for TR 37.716-21-21 to include DC_2-66_n41-n260 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912275 | TP for 36.716-02-01 to include CA configurations for 1-3 | Ericsson, Telstra | imported from 3GU |
R4‑1912276 | TP for 36.716-03-01 to include CA configurations for 1-3-28, 1-3-7 | Ericsson, Telstra | imported from 3GU |
R4‑1912277 | TP for 36.716-04-01 to include CA configurations for 1-3-7-28 | Ericsson, Telstra | imported from 3GU |
R4‑1912278 | TP for TR 38.716-01-01 to include CA_n7B | Ericsson, Telstra | imported from 3GU |
R4‑1912279 | TP for TR 38 716-01-01 to include UL n258B - n258M | Ericsson, Telstra | imported from 3GU |
R4‑1912280 | draft Rel-16 CR to 38.101-3 to add DC configurations for 1_n7 and 3_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1912281 | draft Rel-16 CR to 38.101-3 to add DC configurations for 7_n258 | Ericsson, Telstra | imported from 3GU |
R4‑1912282 | draft Rel-16 CR to 38.101-3 to add DC configurations for 1-3_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1912283 | Requirements for SSB based RLM in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912284 | Intra-frequency measurement requirements in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912285 | Inter-frequency measurement requirements in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912286 | SCell activation and deactivation requirements in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912287 | Solution enhancements to mitigate link failures in FR2 | Intel Corporation | imported from 3GU |
R4‑1912288 | Discuss IAB node frequency error | Hauwei | imported from 3GU |
R4‑1912289 | FR2 SS-RSRP Accuracy Test cases in 38.133 Annex A | ANRITSU LTD | imported from 3GU |
R4‑1912290 | Capacity Comparison for Option 1 and Option 2 probe layouts for FR1 2D MPAC | Spirent Communications | imported from 3GU |
R4‑1912291 | CR to 38.104 on Corrections from endorsed draft CRs (Rel-15) | Ericsson | imported from 3GU |
R4‑1912292 | CR to 38.104 on Corrections from endorsed draft CRs (Rel-16) | Ericsson | imported from 3GU |
R4‑1912293 | Draft CR to 38.104 on Editorial corrections (Rel-15) | Ericsson | imported from 3GU |
R4‑1912294 | Draft CR to 38.104 on Editorial corrections (Rel-16) | Ericsson | imported from 3GU |
R4‑1912295 | Receiver parameters in European regulation | Ericsson | imported from 3GU |
R4‑1912296 | [Draft] LS response on Test methods for Over-the-Air Total Radiated Power field measurements for IMT radio equipment utilizing active antennas | Ericsson | imported from 3GU |
R4‑1912297 | Receiver spurious emission requirements for Category A and Category B | Ericsson | imported from 3GU |
R4‑1912298 | TP to 38.820 on Spurious emission regulation for BS in 7-24 GHz | Ericsson | imported from 3GU |
R4‑1912299 | TP to 38.820 on BS OBUE limits in NR frequency ranges | Ericsson | imported from 3GU |
R4‑1912300 | Update of Parameters, Test case A.7.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1912301 | on simultaneous transmission of PSFCH | Ericsson | imported from 3GU |
R4‑1912302 | On indevice coexisting | Ericsson | imported from 3GU |
R4‑1912303 | Update of Parameters, Test case A.7.7.1.2 FR2 Inter-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1912304 | Draft TR37.824 v0.2.0 Coexistence between NB-IoT and NR | Futurewei | imported from 3GU |
R4‑1912305 | Add RRM Test case setup for 1 AoA in Rx beam peak and 1 in non Rx beam peak | ANRITSU LTD | imported from 3GU |
R4‑1912306 | On Simultaneous Transmission of PSFCH | Futurewei | imported from 3GU |
R4‑1912307 | TP on Indevice Coexistence | Futurewei | imported from 3GU |
R4‑1912308 | IAB MT receiver maximum input level requirement in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1912309 | IAB MT RF co-existence requirements in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1912310 | Synchronization raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912311 | Channel raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912312 | Views on Beam Correspondence | Sony, Ericsson | imported from 3GU |
R4‑1912313 | Views on front-end components for 7 – 24 GHz frequency range for handheld mobile devices | Sony | imported from 3GU |
R4‑1912314 | Views on testability enhancement for UE FR2 test | Sony | imported from 3GU |
R4‑1912315 | TP to TR 38.820 updated on UE front end technology | Sony | imported from 3GU |
R4‑1912316 | Views on Inter band CA | Sony, Ericsson | imported from 3GU |
R4‑1912317 | NR-U UE power class | Sony | imported from 3GU |
R4‑1912318 | Multiple SCells Activation and Deactivation Delay Requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912319 | Views on MPE | Sony, Ericsson | imported from 3GU |
R4‑1912320 | Outdoor channel measurement and simulations for UE RF architecture and deployment scenario in 7–24 GHz frequency range | Sony, Ericsson | imported from 3GU |
R4‑1912321 | Views on the UE rotations and orientations in FR2 MIMO OTA test | Sony, MVG Industries | imported from 3GU |
R4‑1912322 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1912323 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1912324 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1912325 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1912326 | Connected mode channel quality report for UE category NB1 | Qualcomm Incorporated | imported from 3GU |
R4‑1912327 | MSG3-based channel quality report in non-anchor carrier for UE category NB1 | Qualcomm Incorporated | imported from 3GU |
R4‑1912328 | NB-IoT PUR transmit timing requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1912329 | Questions on 35MHZ channel BW support for band n25 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912330 | Link budget for n259 | Sony, Ericsson | imported from 3GU |
R4‑1912331 | Draft CR to TS 38.104: Introduction of NR-U in BS core specification | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912332 | On Total power dynamic range conformance test for NR BS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912333 | Draft CR to 38.141-1: Annex H.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912334 | Draft CR to 38.141-2: Annex L.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912335 | Channel raster for 5GHz NR-U band n46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912336 | Synchronization raster for NR-U in 5GHz band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912337 | On NR-U 6 GHz band details | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912338 | Discussion on NR-U BS Rx requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912339 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912340 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912341 | Draft CR to 38.141-1 with editorial corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912342 | Channel Raster for 60 MHz channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912343 | On UE PSFCH Output power and Spectrum emission mask | LG Electronics Finland | imported from 3GU |
R4‑1912344 | On conditional HO in LTE FeMob | Qualcomm Incorporated | imported from 3GU |
R4‑1912345 | On conditional HO in NR mobility enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1912346 | On DL PRS RSRP measurements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1912347 | On DL PRS RSTD measurements in NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1912348 | On LTE enhanced MBB requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1912349 | On measurement accuracy requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912350 | On measurement requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912351 | On MTC channel quality reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1912352 | On necessity of gNB requirements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1912353 | On NR enhanced MBB requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1912354 | On NRSRSP measurements for NB-IoT PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1912355 | On PSCell addition release delay and interruptions in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912356 | On reference point for timing related measurements in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1912357 | On RSRSP measurements for MTC PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1912358 | On RSS-based measurement accuracy improvement | Qualcomm Incorporated | imported from 3GU |
R4‑1912359 | On RSSI and channel occupancy measurements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912360 | On SCell activation deactivation in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912361 | On UE Rx-Tx time difference measurements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1912362 | On UE-based positioning performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1912363 | simulation results for R16 eMTC WUS | Qualcomm Incorporated | imported from 3GU |
R4‑1912364 | simulation results for R16 NB-IoT WUS | Qualcomm Incorporated | imported from 3GU |
R4‑1912365 | system level simulation results for DL PRS side conditions | Qualcomm Incorporated | imported from 3GU |
R4‑1912366 | On impact of PRS on existing RRM requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1912367 | On RRM measurements in non-anchor carrier for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R4‑1912368 | On PSFCH AGC settling time for NR V2X | LG Electronics Finland | imported from 3GU |
R4‑1912369 | TP on BS RF requirements for adding channel bandwidth in band n28 | CATT | imported from 3GU |
R4‑1912370 | PI/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1912371 | Clarification on SFTD applicability | Ericsson | imported from 3GU |
R4‑1912372 | [Draft] Reply LS on SFTD measurement | Ericsson | imported from 3GU |
R4‑1912373 | CR 38.133 (8.3.2) Amendment of requirements depending on T_SMTC_MAX | Ericsson | imported from 3GU |
R4‑1912374 | CR 38.133 (8.3.3) Correction to SCell deactivation delay | Ericsson | imported from 3GU |
R4‑1912375 | CR 38.133 (8.10) Correction to TCI state switching delay | Ericsson | imported from 3GU |
R4‑1912376 | CR 38.133 (A.7.5.7) TCs for PSCell addition and release delay in NR-DC | Ericsson | imported from 3GU |
R4‑1912377 | On activation of multiple SCells | Ericsson | imported from 3GU |
R4‑1912378 | On Direct SCell activation | Ericsson | imported from 3GU |
R4‑1912379 | On CLI measurements | Ericsson | imported from 3GU |
R4‑1912380 | On SFTD for NR-U scenario B | Ericsson | imported from 3GU |
R4‑1912381 | Draft reply LS on AGC settling time and RB size of PSFCH | LG Electronics Finland | imported from 3GU |
R4‑1912382 | On channel raster, SSB raster and wide-band operation for NR-U | LG Electronics Finland | imported from 3GU |
R4‑1912383 | Overview of FR1 UE RF requirement for Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1912384 | views on MU for FR1 MIMO OTA | CAICT, SAICT | imported from 3GU |
R4‑1912385 | CR for intra-band DL contiguous CA RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912386 | New methods of handling UEs with multiple TX ports | Qualcomm Incorporated | imported from 3GU |
R4‑1912387 | On transient period capability | Huawei, HiSilicon | imported from 3GU |
R4‑1912388 | New basket WID to manage requests adding wider CBW support to existing bands | Ericsson | imported from 3GU |
R4‑1912389 | Way forward on the new basket WID - adding wider CBW to existing NR bands | Ericsson | imported from 3GU |
R4‑1912390 | UE transient time reporting capability | Ericsson | imported from 3GU |
R4‑1912391 | CR for TS 38.101-1 transmit on off time mask | Huawei, HiSilicon | imported from 3GU |
R4‑1912392 | Variable duplexer spacing | Qualcomm Incorporated | imported from 3GU |
R4‑1912393 | On switching time for MIMO layer adaption | Huawei, HiSilicon | imported from 3GU |
R4‑1912394 | On spurious emission UE coexistence for LTE V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1912395 | Clarification of system parameters for 7-24 GHz study | Futurewei | imported from 3GU |
R4‑1912396 | CR for 36.101 spurious emission UE coexistence for V2X Rel-14 | Huawei, HiSilicon | imported from 3GU |
R4‑1912397 | CR for 36.101 spurious emission UE coexistence for V2X Rel-15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912398 | CR for 36.101 spurious emission UE coexistence for V2X Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1912399 | On intra-band NC DL CA for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912400 | On separation class signalling for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912401 | On intra-band NC UL CA for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912402 | On inter-band CA for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912403 | On beam correspondence for Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1912404 | On MPE enhancement for Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1912405 | On new power class for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912406 | On PTRS configuration for EVM requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1912407 | QoQZ (Quality of Quiet Zone) Results for a Plane Wave Synthesizer (PWS) Implementation | MVG Industries | imported from 3GU |
R4‑1912408 | Draft CR for 38.101-2 EVM and Uplink reference measurement channel | Huawei, HiSilicon | imported from 3GU |
R4‑1912409 | Draft CR: SNR definition for NPRACH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912410 | Demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912411 | TP for TR 37.823: Addition of n90 frequency band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912412 | Simulation results and specification aspects for RSS based RSRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912413 | Draft LS on RSS based RSRP measurement performance in collision scenarios | Nokia | imported from 3GU |
R4‑1912414 | On channel quality reporting for NB-IoT in RRC connected mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912415 | On the scope of RRM requirements for NR positioning | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912416 | System-level simulation results for RSTD in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912417 | Draft CR for NS_202 operating band | Huawei, HiSilicon | imported from 3GU |
R4‑1912418 | Draft CR for 38.101-3 EN-DC MPR and AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1912419 | On FR1 2D MPAC probe layout | Huawei, HiSilicon | imported from 3GU |
R4‑1912420 | On EIS test metric | Huawei, HiSilicon | imported from 3GU |
R4‑1912421 | Draft CR for 38.101-2 draft CR on side condition for BC | Huawei, HiSilicon | imported from 3GU |
R4‑1912422 | WF on FR1 intra-band contiguous UL CA RF requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1912423 | Views on Tests for High Speed Train Scenarios | Qualcomm Incorporated | imported from 3GU |
R4‑1912424 | LS on sweep time for LTE V2X UE co-existence spurious emission | Huawei, HiSilicon | imported from 3GU |
R4‑1912425 | Introduction of completed R16 3DL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1912426 | Dynamic Power Sharing test proposal | Sprint Corporation | imported from 3GU |
R4‑1912427 | TP for TR 37.716-11-11: Introduction of DC_26A_n25A | Sprint Corporation | imported from 3GU |
R4‑1912428 | TP for TR 37.716-21-11: Introduction of EN-DC combinations with Band 25, Band 41 and n41 | Sprint Corporation | imported from 3GU |
R4‑1912429 | TP for TR 38.716-02-00: Introduction of UL CA_n25A-n41A for DL CA_n25A-n41C and DL CA_n25A-n41(2A) | Sprint Corporation | imported from 3GU |
R4‑1912430 | Draft CR for 38.101-1: Making 90 MHz channel bandwidth mandatory for n41, n78 and n90 | Sprint Corporation, Vodafone, Ericsson | imported from 3GU |
R4‑1912431 | n26 Emissions requirements | Sprint Corporation, SouthernLINC, Dish Network | imported from 3GU |
R4‑1912432 | UE Coexistence Spreadsheet | Sprint Corporation | imported from 3GU |
R4‑1912433 | Documentation of Mandatory UE Channel Bandwidths | Sprint Corporation | imported from 3GU |
R4‑1912434 | 29 dBm HPUE regulatory aspects | Sprint Corporation | imported from 3GU |
R4‑1912435 | Measurements and/or simulations for standalone 29 dBm HPUE MPR/A-MPR | Sprint Corporation | imported from 3GU |
R4‑1912436 | Modified A-MPR behavior for n41 | Sprint Corporation | imported from 3GU |
R4‑1912437 | PowerClass for UL MIMO | Sprint Corporation | imported from 3GU |
R4‑1912438 | Signaling concerns for adding legacy channel bandwidth to an existing band | Sprint Corporation | imported from 3GU |
R4‑1912439 | On FR2 DL 256QAM BS implementation feasibility | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912440 | Feasibility evaluation for NR FR2 DL256QAM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912441 | Discussion on applicable TDD configuration for NR BS performance | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912442 | Alignment of receiver spurious emissions requirements for BS type 1-O/2-O | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912443 | Draft CR to TS 36.104 Introduction of PUSCH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912444 | Draft CR to TS 36.141 Introduction of PUSCH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912445 | Draft CR to TS 36.104 Introduction of PRACH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912446 | Draft CR to TS 36.141 Introduction of PRACH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912447 | Views on PUSCH and PRACH for LTE HST enhancement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912448 | BS RF requirement and test tolerance for n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912449 | Views on 30% TP test point for BS demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912450 | Views on NR PUSCH for high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912451 | Views on NR PRACH for high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912452 | Views on gNB measurement for NR positioning | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912453 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912454 | TR 36.716-04-01 v0.6.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912455 | Updated scope of TR: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912456 | On BS requirements for NR FDD bands with variable duplex | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912457 | Introduction of Transient period capability in Rel 16 | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912458 | Location of transient period with capability | Qualcomm Incorporated, Nokia, Ericsson, Nokia Shanghai Bell | imported from 3GU |
R4‑1912459 | CGI reading requirements with autonomous gap for NR capable UE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912460 | Input to WF on Transient Period Capability | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912461 | Test procedure for measuring the effect of transient period duration on EVM outside of transient for FR1 | Qualcomm Incorporated, Keysight Technologies | imported from 3GU |
R4‑1912462 | Values for Transient Period Capability | Qualcomm Incorporated, Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912463 | Corrections to Transient Time Masks | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912464 | Input to WF on Region 1 Extension for Power Class 3 Operation in FR2 and output power boosting | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912465 | Corrections to MSD tables due to cross-band isolation for EN-DC in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912466 | Views on n28 Bandwidth Extension to 30MHz | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912467 | UE capability of requiring no guard period for SRS with frequency hopping and antenna switching | Qualcomm Inc. | imported from 3GU |
R4‑1912468 | EN-DC MSD Target Transmission Power Assumptions and Test Procedure | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912469 | CR to TS 36.133: adding new test cases for PCell reselection in idle mode and PCell measurements in connected mode for 500 km/h | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912470 | Assumptions for n26 20MHz CBW MSD studies | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912471 | V2X transient period for PSS and SSS transmission | Qualcomm Inc. | imported from 3GU |
R4‑1912472 | DC_(n)5AA MSD TP proposal | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912473 | NR V2X RF Coex Simulation results | Qualcomm Inc. | imported from 3GU |
R4‑1912474 | CR to TS 36.133: updating TBD in subclauses 4.2, 8.1, 8.3, 9.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912475 | CR to TS 36.141: capturing agreements for LTE HST scenarios at 500 km/h | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912476 | Simulation results of PRACH preamble restricted set type B for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912477 | RF Requirements for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1912478 | On PUSCH simulation results for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912479 | BS demodulation simulation results of PUSCH for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912480 | Initial system simulation results for Rel-16 NR high speed train scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912481 | CR to TS 38.141-2: adding angular step (alignment) requirements in Annex I | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912482 | Discussion of angular alignment on in-band TRP measurement errors | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912483 | Further discussion on beam-based directions for TRP estimates of in-band unwanted emissions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912484 | Comparison of options for FDD-TDD PC2 duty cycle capability signaling | Qualcomm Incorporated | imported from 3GU |
R4‑1912485 | 30 MHz channel bandwidth in Band n28 | Qualcomm Incorporated | imported from 3GU |
R4‑1912486 | Addition of new bandwidths: mandatory vs. optional | Qualcomm Incorporated | imported from 3GU |
R4‑1912487 | NR-U general emission requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1912488 | Uplink sub-bands for wideband operation | Qualcomm Incorporated | imported from 3GU |
R4‑1912489 | NR-U wideband operation | Qualcomm Incorporated | imported from 3GU |
R4‑1912490 | Power class 3 for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912491 | [Draft] LS on UL wideband operation for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912492 | NR-U single carrier interlaced waveform and emissions | Qualcomm Incorporated | imported from 3GU |
R4‑1912493 | [Draft] On the Addition of New Channel Bandwidths | Qualcomm Incorporated | imported from 3GU |
R4‑1912494 | CR to TS 37.145-2: adding angular step (alignment) requirements in Annex F | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912495 | On power class and Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1912496 | CR on performance requirements for UCI multiplexed on PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑1912497 | Updated split of the NR editorial work | Apple | imported from 3GU |
R4‑1912498 | Further discussion on NR-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912499 | Further discussion on NE-DC and NGEN-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912500 | CR on NR-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912501 | CR on NE-DC and NGEN-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912502 | CR on demodulation performance requirements for EN-DC including FR1 and FR2 CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1912503 | CR on CSI reporting requirements for EN-DC including FR1 and FR2 CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1912504 | Correction of NR PDCCH demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912505 | Overlapping CA to support available spectrum with irregular bandwidth for NR | Huawei, HiSilicon | imported from 3GU |
R4‑1912506 | LTE/NR 48/n48 5G NR NSA frequency combinations | Federated Wireless, Charter Communications, Comcast, CableLabs, Google | imported from 3GU |
R4‑1912507 | On uplink full power transmission | Huawei, HiSilicon | imported from 3GU |
R4‑1912508 | On Tx diversity and UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1912509 | On EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1912510 | Draft CR for TS 38.101-3: EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1912511 | LS on EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1912512 | UE RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1912513 | On UE framework for NR-V2X in licensed bands | Huawei, HiSilicon | imported from 3GU |
R4‑1912514 | On switching time between LTE SL and NR SL | Huawei, HiSilicon | imported from 3GU |
R4‑1912515 | Draft reply LS on UL-SL prioritization | Huawei, HiSilicon | imported from 3GU |
R4‑1912516 | Draft reply LS on NR V2X cross-RAT configuration | Huawei, HiSilicon | imported from 3GU |
R4‑1912517 | Performance evaluation of S-SSB structure | Huawei, HiSilicon | imported from 3GU |
R4‑1912518 | Draft reply LS on NR V2X S-SSB design | Huawei, HiSilicon | imported from 3GU |
R4‑1912519 | Draft reply LS on AGC settling time and RB size of PSFCH | Huawei, HiSilicon | imported from 3GU |
R4‑1912520 | On SAR solutions for FDD+TDD HPUE | Huawei, HiSilicon | imported from 3GU |
R4‑1912521 | TP for TR 37.815 Example TDM patterns for SAR limits | Huawei, HiSilicon | imported from 3GU |
R4‑1912522 | Introduction of completed LTE CA for 2 bands DL with 2 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1912523 | draft CR for 38.101-1 Clarification on UL MIMO power class | Huawei, HiSilicon | imported from 3GU |
R4‑1912524 | CA_n78-n79 MSD for UE supporting NR bands n78 and n79 only | Qualcomm Incorporated | imported from 3GU |
R4‑1912525 | Draft CR for MAC-CE based TCI State switch for SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1912526 | Draft CR for RRC based TCI State switch for SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1912527 | Discussion on UL one shot timing adjustment | Qualcomm Incorporated | imported from 3GU |
R4‑1912528 | Discussion on multiple SCell activation | Qualcomm Incorporated | imported from 3GU |
R4‑1912529 | Intra and inter-frequency definition for CSI-RS based RRM measurements | Qualcomm Incorporated | imported from 3GU |
R4‑1912530 | Discussion of remaining issues on CLI | Qualcomm Incorporated | imported from 3GU |
R4‑1912531 | Use of Y in calculating FR2 antenna gain range | ANRITSU LTD | imported from 3GU |
R4‑1912532 | On missing Requirements for ULSUP FDM | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912533 | n25 Wider BW REFSENS | Qualcomm Incorporated | imported from 3GU |
R4‑1912534 | Discussion on multiple SCell activation | Qualcomm Incorporated | imported from 3GU |
R4‑1912535 | Intra and inter-frequency definition for CSI-RS based RRM measurements | Qualcomm Incorporated | imported from 3GU |
R4‑1912536 | Discussion of remaining issues on CLI | Qualcomm Incorporated | imported from 3GU |
R4‑1912537 | V2X N transmissions | Qualcomm CDMA Technologies | imported from 3GU |
R4‑1912538 | TP to TR38.831: On REFSENS for Inter-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑1912539 | Requirements for ENDC Inter-band combination that share common RX path | Qualcomm Incorporated | imported from 3GU |
R4‑1912540 | draftCR to TR 37.843: Addition of Plane Wave Synthesizer. MU, calibration and test procedure for In-band TRP requirements. | CAICT | imported from 3GU |
R4‑1912541 | Way forward on adding new bandwidths | Qualcomm Korea | imported from 3GU |
R4‑1912542 | Draft CR for 38.101-3 EN-DC DL Synchronous Carriers | Qualcomm Incorporated | imported from 3GU |
R4‑1912543 | Additional Requirements Needed for Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1912544 | Draft CR for 38.101-3 EN-DC RX Out-of-Band Blocking for shared bands and bands in close proximity | Qualcomm Incorporated | imported from 3GU |
R4‑1912545 | Draft CR for 38.101- RX Out-of-Band Blocking for B38 and B41 | Qualcomm Incorporated | imported from 3GU |
R4‑1912546 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 38, 41 | Qualcomm Incorporated | imported from 3GU |
R4‑1912547 | Impact of Correlation Mismatch in MIMO Capacity | Qualcomm | imported from 3GU |
R4‑1912548 | Range of T_delta in IAB OTA synchronization | Qualcomm | imported from 3GU |
R4‑1912549 | Defining RRM requirements for IAB nodes | Qualcomm | imported from 3GU |
R4‑1912550 | Discussion regarding inclusion of SI reading during handover | Qualcomm | imported from 3GU |
R4‑1912551 | Evaluation Periods for RLM in NR-U | Qualcomm | imported from 3GU |
R4‑1912552 | Timing Requirements in NR-U | Qualcomm | imported from 3GU |
R4‑1912553 | Updating RRM requirements due to power saving work item | Qualcomm | imported from 3GU |
R4‑1912554 | CSI-RS measurement outside C-DRX active time | Qualcomm | imported from 3GU |
R4‑1912555 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 32 | Qualcomm Incorporated | imported from 3GU |
R4‑1912556 | Draft CR to 38.101-3 Missing Harmonic Mixing MSD for DC_3_n77/n78 | Qualcomm Incorporated | imported from 3GU |
R4‑1912557 | n39 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1912558 | CR to 38.101-1. Align NS27 AMPR to CA_NS_10 AMPR for 40MHz BW at the center of band 48. | Qualcomm Incorporated | imported from 3GU |
R4‑1912559 | Intra-band Contiguous ULCA MPR for FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1912560 | PI/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1912561 | n1 30MHz REFSENS | Qualcomm Incorporated | imported from 3GU |
R4‑1912562 | draft Rel-16 CR to 38.101-3 to add DC configurations for 2_n71 and 2_n41 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912563 | draft Rel-16 CR to 38.101-3 to add DC configurations for 2-66_n71 and 2-66_n41 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912564 | TP for TR 38 716-01-01 to include UL n258B - n258M | Ericsson, Telstra | imported from 3GU |
R4‑1912565 | TP for TR 37.716-11-11: Introduction of DC_26A_n25A | Sprint Corporation | imported from 3GU |
R4‑1912566 | TP for TR37.716-11-11:DC_39_n40 | ZTE Corporation | imported from 3GU |
R4‑1912567 | TP for TR 37.716-11-11: DC_12A_n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1912568 | updated TP for TR 37.716-21-21: DC_1-3_n7-n78 to add configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1912569 | updated TP for TR 37.716-21-21: DC_3-7_n1-n78 to add configurations | Huawei, HiSilicon | imported from 3GU |
R4‑1912570 | TP to TR 37.716-31-11: addition of DC_2+46+66_n261 | Nokia, TMO US | imported from 3GU |
R4‑1912571 | TP for TR 37.716-11-11 to include DC_20_n38 | Ericsson, Swisscom | imported from 3GU |
R4‑1912572 | TP for TR 37.716-31-11: DC_2-13-66_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1912573 | TP for TR 37.716-31-11: DC_7-13-66_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1912574 | TP to TR 37.716-21-21: Addition of DL_3A-7C_n1A-n78A, DL_3C-7A_n1A-n78A and DL_3C-7C_n1A-n78A | Nokia, BT | imported from 3GU |
R4‑1912575 | TP for TR 37.716-11-11: DC_2A_n48A, DC_5A_n48A, DC_13A_n48A, DC_66A_n48A | Verizon, Ericsson | imported from 3GU |
R4‑1912576 | TP to TR 37.716-21-21: Addition of DL_3C_n1A-n78A | Nokia, BT | imported from 3GU |
R4‑1912577 | TP for TR 38.716-03-02 CA_n28A-n77(2A)-n257 | KDDI | imported from 3GU |
R4‑1912578 | TP for TR 38.716-02-00: CA_n66A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1912579 | TP for TR 38.716-02-00: CA_n1A-n3A and CA_n1B-n3A | Huawei, HiSilicon, Ericsson | imported from 3GU |
R4‑1912580 | TP for TR 38.716-02-00: CA_n1-n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1912581 | TP for 36.716-02-01 to include CA configurations for 1-3 | Ericsson, Telstra | imported from 3GU |
R4‑1912582 | TP for 36.716-04-01 to include CA configurations for 1-3-7-28 | Ericsson, Telstra | imported from 3GU |
R4‑1912583 | TP for TR 37.716-21-11: EN-DC_1-8_n3 | SoftBank Corp. | imported from 3GU |
R4‑1912584 | TR 37.716-21-11 v0.7.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1912585 | TP for TR 36.716-03-02 to include 4 bands DL with 2 bands DL band combinations | LG Electronics Polska | imported from 3GU |
R4‑1912586 | TP for TR 37.716-33: DC_66A_n5A-n260 and DC_66A_n5A-n261 | Qualcomm Incorporated | imported from 3GU |
R4‑1912587 | TP for TR 37.716-21-11: DC_13-66_n260 | Samsung, Verizon | imported from 3GU |
R4‑1912588 | TP for TR 37.716-21-11: DC_13-66_n261 | Samsung, Verizon | imported from 3GU |
R4‑1912589 | TP for TR 37.716-21-11: DC_2-66_n260 | Samsung, Verizon | imported from 3GU |
R4‑1912590 | TP for TR 37.716-21-11: DC_2-66_n261 | Samsung, Verizon | imported from 3GU |
R4‑1912591 | TP for TR 37.716-21-11: DC_13-48_n2 | Samsung, Verizon | imported from 3GU |
R4‑1912592 | TP for TR 37.716-21-11: DC_13-48_n66 | Samsung, Verizon | imported from 3GU |
R4‑1912593 | TP for TR 37.716-21-11: DC_48-66_n5 | Samsung, Verizon | imported from 3GU |
R4‑1912594 | TP for TR 37.716-21-21: DC_8A_n78A-n257 | Samsung, KT | imported from 3GU |
R4‑1912595 | TP for TR 37.716-21-21: DC_3C_n78A-n257 | Samsung, KT | imported from 3GU |
R4‑1912596 | TP for TR 37.716-21-21: DC_3A-8A_n78A-n257 | Samsung, KT | imported from 3GU |
R4‑1912597 | TP for TR 37.716-21-21: DC_1A-8A_n78A-n257A | Samsung, KT | imported from 3GU |
R4‑1912598 | TP for TR 37.716-21-21: DC_1A-3-8A_n78A-n257A | Samsung, KT | imported from 3GU |
R4‑1912599 | TP to TR 37.716-21-21: DC_2A-7A-7A_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1912600 | TP for TR 37.716-21-21 to include DC_2_n41-n71 | Ericsson, T-Mobile | imported from 3GU |
R4‑1912601 | TP for TR 37.716-21-11: DC_2-13_n260 | Samsung, Verizon | imported from 3GU |
R4‑1912602 | TP for TR 37.716-21-11: DC_2-13_n261 | Samsung, Verizon | imported from 3GU |
R4‑1912603 | TP for TR 37.716-21-21: EN-DC_1_n3-n28 | SoftBank Corp. | imported from 3GU |
R4‑1912604 | TP for TR 37.716-21-11 to include DC_1-7_n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1912605 | TP for TR 37.716-21-11 to include DC_1-20_n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1912606 | TP for TR 36.716-04-01: LTE CA_1-3-8-42 | SoftBank Corp. | imported from 3GU |
R4‑1912607 | TP for TR 37.716-21-11 to include DC_3-20_n38 | Ericsson, Swisscom | imported from 3GU |
R4‑1912608 | Band n48 CA bandwidth class and CA configuration | Verizon UK Ltd | imported from 3GU |
R4‑1912609 | TP for TR 38.716-01-01: DL_n7(2A)_UL_n7A | Huawei, HiSilicon | imported from 3GU |
R4‑1912610 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1912611 | draftCR for 38.101-1 introduce SUL band combination DL_n78(2A)_SUL_n78A-n86A | Huawei, HiSilicon | imported from 3GU |
R4‑1912612 | TP for TR 38.716-01-01: DL_n7(2A)_UL_n7A | Huawei, HiSilicon | imported from 3GU |
R4‑1912613 | TP to TR 37.716-21-21: DC_7A-7A-66A_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1912614 | LS on EN-DC MSD Transmit Power Level Assumptions | Skyworks Solutions Inc. | imported from 3GU |
R4‑1912615 | void | void | imported from 3GU |
R4‑1912616 | void | void | imported from 3GU |
R4‑1912617 | void | void | imported from 3GU |
R4‑1912618 | void | void | imported from 3GU |
R4‑1912619 | void | void | imported from 3GU |
R4‑1912620 | void | void | imported from 3GU |
R4‑1912621 | void | void | imported from 3GU |
R4‑1912622 | void | void | imported from 3GU |
R4‑1912623 | void | void | imported from 3GU |
R4‑1912624 | void | void | imported from 3GU |
R4‑1912625 | void | void | imported from 3GU |
R4‑1912626 | void | void | imported from 3GU |
R4‑1912627 | void | void | imported from 3GU |
R4‑1912628 | void | void | imported from 3GU |
R4‑1912629 | void | void | imported from 3GU |
R4‑1912630 | void | void | imported from 3GU |
R4‑1912631 | void | void | imported from 3GU |
R4‑1912632 | void | void | imported from 3GU |
R4‑1912633 | void | void | imported from 3GU |
R4‑1912634 | void | void | imported from 3GU |
R4‑1912635 | void | void | imported from 3GU |
R4‑1912636 | void | void | imported from 3GU |
R4‑1912637 | void | void | imported from 3GU |
R4‑1912638 | void | void | imported from 3GU |
R4‑1912639 | void | void | imported from 3GU |
R4‑1912640 | void | void | imported from 3GU |
R4‑1912641 | void | void | imported from 3GU |
R4‑1912642 | void | void | imported from 3GU |
R4‑1912643 | void | void | imported from 3GU |
R4‑1912644 | void | void | imported from 3GU |
R4‑1912645 | void | void | imported from 3GU |
R4‑1912646 | void | void | imported from 3GU |
R4‑1912647 | void | void | imported from 3GU |
R4‑1912648 | void | void | imported from 3GU |
R4‑1912649 | void | void | imported from 3GU |
R4‑1912650 | void | void | imported from 3GU |
R4‑1912651 | void | void | imported from 3GU |
R4‑1912652 | void | void | imported from 3GU |
R4‑1912653 | void | void | imported from 3GU |
R4‑1912654 | void | void | imported from 3GU |
R4‑1912655 | void | void | imported from 3GU |
R4‑1912656 | void | void | imported from 3GU |
R4‑1912657 | void | void | imported from 3GU |
R4‑1912658 | void | void | imported from 3GU |
R4‑1912659 | void | void | imported from 3GU |
R4‑1912660 | void | void | imported from 3GU |
R4‑1912661 | void | void | imported from 3GU |
R4‑1912662 | Outline specification structure for 36.133 and 38.133 NR-U requirements | Ericsson | imported from 3GU |
R4‑1912663 | Way forward on NR-U RRM work split | Huawei, HiSilicon | imported from 3GU |
R4‑1912664 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912665 | Discussion on RSSI and CO measurements for NR-U | ZTE Corporation | imported from 3GU |
R4‑1912666 | Analysis of UE RRM power consumption in RRC IDLE/ INACTIVE | vivo | imported from 3GU |
R4‑1912667 | Way forward on CLI remaining RRM open issues | LGE | imported from 3GU |
R4‑1912668 | Ad hoc minutes for Rel-15/16 NR UE demodulation and CSI requirements | China Telecom | imported from 3GU |
R4‑1912669 | Ad hoc minutes for Rel-15/16 NR BS demodulation requirements | Huawei | imported from 3GU |
R4‑1912670 | Ad hoc minutes for Rel-15 NR RRM (part 1) | Huawei | imported from 3GU |
R4‑1912671 | Way forward on NR BS Rel-15 demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912672 | Draft CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1912673 | Draft CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1912674 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1912675 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1912676 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1912677 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1912678 | draftCR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912679 | draftCR: Updates for PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1912680 | draftCR: Updates for PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1912681 | draftCR: Updates for PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1912682 | Draft CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912683 | Draft CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912684 | Draft CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912685 | Draft CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912686 | Draft CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912687 | Draft CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912688 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912689 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912690 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912691 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1912692 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1912693 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1912694 | Draft CR on NR UCI on PUSCH performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1912695 | Draft CR on NR UCI on PUSCH conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1912696 | Draft CR on NR UCI on PUSCH radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1912697 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1912698 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1912699 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1912700 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1912701 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1912702 | draftCR:updates to PRACH conducted performance requirements in TS 38.141-1 | CATT | imported from 3GU |
R4‑1912703 | draftCR: updates to PRACH conductedOTA performance requirements in TS 38.141-2 | CATT | imported from 3GU |
R4‑1912704 | Reply LS on definition fro SFTD measurement | Apple | imported from 3GU |
R4‑1912705 | Reply LS on SFTD measurement | Intel Corporation | imported from 3GU |
R4‑1912706 | CR on definition of intra-freqeuncy measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1912707 | LS on NR Mobility Enhancements | Intel | imported from 3GU |
R4‑1912708 | WF on NR V2X RRM requirement | LG Electronics, MediaTek | imported from 3GU |
R4‑1912709 | Way forward on on PDSCH CA normal demodulation requirements | Intel | imported from 3GU |
R4‑1912710 | Way forward on PMI reporting requirements for Tx ports larger than 8 and up to 32 | Ericsson | imported from 3GU |
R4‑1912711 | Way forward on TDD LTE-NR co-existence demodulation requirement | Huawei, HiSilicon, Ericsson, Samsung | imported from 3GU |
R4‑1912712 | Ad hoc minutes for NR-U RRM requirements (part 1) | Ericsson | imported from 3GU |
R4‑1912713 | Link-level simulation assumptions for NR V2X synchronization | MediaTek inc., LG Electronics | imported from 3GU |
R4‑1912714 | Reply LS on T_delta for IAB OTA timing alignment | Samsung | imported from 3GU |
R4‑1912715 | Way forward on scope on NR IAB RRM requirements | Qualcomm | imported from 3GU |
R4‑1912716 | MRTD and MTTD requirements for asynchronous NR-NR DC | Ericsson | imported from 3GU |
R4‑1912717 | Way forward on MR-DC RRM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912718 | Introducing euCA related interruption requirements for EN-DC in 38.133 (section 8.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1912719 | Introducing euCA related interruption requirements for NE-DC in 38.133 (section 8.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1912720 | Introducing euCA related interruption requirements for EN-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1912721 | Introducing euCA related interruption requirements for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1912722 | Ad hoc minutes for Rel-15/16 NR BS demodulation requirements | Huawei | imported from 3GU |
R4‑1912723 | draftCR:updates to PRACH performance requirements in TS 38.104 | CATT | imported from 3GU |
R4‑1912724 | Ad hoc minutes for Rel-15/16 NR UE demodulation and CSI requirements | China Telecom | imported from 3GU |
R4‑1912725 | Ad-hoc minutes on NR URLLC test feasibility | Ericsson | imported from 3GU |
R4‑1912726 | Ad hoc minutes for NR HST demodulation | CMCC | imported from 3GU |
R4‑1912727 | Way forward on NR HST UE demodulation | CMCC | imported from 3GU |
R4‑1912728 | Way forward on NR HST PUSCH demodulation | Huawei | imported from 3GU |
R4‑1912729 | Way forward on NR HST PRACH demodulation | Samsung | imported from 3GU |
R4‑1912730 | Ad hoc minutes for Rel-15 NR RRM (part 2) | Huawei | imported from 3GU |
R4‑1912731 | WF on gNB RRM requirements for NR positioning | Intel, Qualcomm, NTT Docomo, Apple, MTK, CATT,CMCC | imported from 3GU |
R4‑1912732 | WF on simulation assumptions for system-level evaluations for PRS-RSTD and PRS-RSRP | Ericsson | imported from 3GU |
R4‑1912733 | Ad-hoc minutes for NR Positioning RRM | Ericsson | imported from 3GU |
R4‑1912734 | Ad hoc minutes for R16 NR RRM enhancements | Intel | imported from 3GU |
R4‑1912735 | Way forward on Rel-16 MTC RRM enhancement | Ericsson, Huawei, HiSilicon, Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912736 | NR FR2 RSRP accuracy test case ad hoc meeting notes | Anritsu | imported from 3GU |
R4‑1912737 | Simulation results of PDSCH for HST single tap | Ericsson | imported from 3GU |
R4‑1912738 | Simulation results on NB-IoT NPRACH demodulation performance for TDD | Ericsson | imported from 3GU |
R4‑1912739 | Way forward on inter-frequency measurement without MG | CMCC | imported from 3GU |
R4‑1912740 | Views on normal PDSCH demodulation test for CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912741 | CR on UMTS inter-RAT measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912742 | WF on RRM Requirement Scope for Rel-16 NR eMIMO WI | Samsung, Huawei | imported from 3GU |
R4‑1912743 | LS Response on the feasibility of time synchronization accuracy requirements and related testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912744 | Reply LS on second SMTC periodicity in idle mode | Orange | imported from 3GU |
R4‑1912745 | Further discussion on scenario and transmission schemes | Huawei, HiSilicon | imported from 3GU |
R4‑1912746 | Discussion and simulation results for LTE Rel-15 FeNB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1912747 | Updated simulation results for NR PUSCH FR1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912748 | CR on NR-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912749 | Draft CR on corrections for MIMO Correlation Matrices | Qualcomm Incorporated | imported from 3GU |
R4‑1912750 | Draft CR to TS 38.101-4: Corrections for Applicability rules | Intel Corporation | imported from 3GU |
R4‑1912751 | CR: Updates for NR EN-DC SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1912752 | CR: Updates for NR RMC | Huawei, HiSilicon | imported from 3GU |
R4‑1912753 | CR on demodulation performance requirements for EN-DC including FR1 and FR2 CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1912754 | CR on CSI reporting requirements for EN-DC including FR1 and FR2 CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1912755 | Summary of ideal and impairment results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1912756 | editorial CR for section 8.1,8.8,8.9,8.10,8.11 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912757 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1912758 | DraftCR on handover 36.133 | MediaTek inc. | imported from 3GU |
R4‑1912759 | DraftCR on handover 38.133 | MediaTek inc. | imported from 3GU |
R4‑1912760 | draftCR on handover RRM requirement (section 6.1.1.5) | Intel Corporation | imported from 3GU |
R4‑1912761 | Correction on delay uncertainty of RRC Release with redirection requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1912762 | Correction on RRC Re-establishment requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1912763 | Way Forward on One-time UE transmit timing adjustment | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912764 | Threshold for one shot UE timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1912765 | CR on MRTD and MTTD requirement (7.5, 7.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912766 | Way forward on TCI state switching | MediaTek | imported from 3GU |
R4‑1912767 | Correction on the TCI state switching (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1912768 | Correction on the BWP switch TCI state before MAC activation (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1912769 | CR to add QCL definition (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1912770 | LS on CSI-RS measurement outside DRX active time | Huawei, HiSilicon | imported from 3GU |
R4‑1912771 | CR for SSB based candidate beam detection | MediaTek inc. | imported from 3GU |
R4‑1912772 | Add RRM Test case setup for 1 AoA in Rx beam peak and 1 in non Rx beam peak | ANRITSU LTD | imported from 3GU |
R4‑1912773 | Update of Parameters, Test case A.7.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1912774 | Update of Parameters, Test case A.7.7.1.2 FR2 Inter-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1912775 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1912776 | [draft] CR on introducing UE demodulation tests for single tap HST with 500km/h | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912777 | Way forward on LTE HST BS demodulation requirements | NTT DoCoMo | imported from 3GU |
R4‑1912778 | Draft CR to TS 36.104 Introduction of PUSCH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912779 | WF on LTE FDD performance requirements for intra-band contiguous CA with minimum channel spacing | Huawei, HiSilicon, China Telecom, MediaTek | imported from 3GU |
R4‑1912780 | CR: Correction of HST-SFN channel model (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑1912781 | WF on RRM for NR HST | CMCC | imported from 3GU |
R4‑1912782 | LS on thresholds for serving cell RSRP change based TA validation in PUR | Huawei, HiSilicon | imported from 3GU |
R4‑1912783 | Way forward on RRM requirements of R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1912784 | Way forward on feMob in LTE R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1912785 | Ad hoc minutes on scope on NR IAB RRM requirements | Qualcomm | imported from 3GU |
R4‑1912786 | Correction in interruption requirements (section 8.2) | Ericsson, ZTE | imported from 3GU |
R4‑1912787 | Ad hoc minutes for NR-U RRM requirements (part 2) | Ericsson | imported from 3GU |
R4‑1912788 | Summary of offline discussion on NR-U specification structure | Ericsson | imported from 3GU |
R4‑1912789 | Adding the IE flag in R16 HST | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912790 | Way forward on RRM requirements for LTE-based 5G terrestrial broadcast | Qualcomm | imported from 3GU |
R4‑1912791 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1912792 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1912793 | Ad-hoc minutes for NR Positioning RRM | Ericsson | imported from 3GU |
R4‑1912794 | CR to introduce CLI measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912795 | Draft CR for cross link interference measurements (scetion 9) | LG Electronics Inc. | imported from 3GU |
R4‑1912796 | Draft CR for conditions for cross link interference measurements (scetion B) | LG Electronics Inc. | imported from 3GU |
R4‑1912797 | Correction to direct Scell activation requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912798 | Correction to direct Scell activation during HO requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912799 | Adding interruption length requirements for direct Scell activation R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912800 | Update to interruption requirements due to measurement on dormant Scell R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912801 | Adding interruption length requirements for dormant state transition R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912802 | Measurements interruption requirements for an SCell in Dormant state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912803 | Correction to interruption requirement introduction to include dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912804 | Way forward on euCA RRM | Huawei | imported from 3GU |
R4‑1912805 | Draft CR to TS 38.101-4: Introduction of NE-DC and NR-DC SDR requirements | Intel Corporation | imported from 3GU |
R4‑1912806 | CR on NE-DC and NGEN-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912807 | Draft CR to TS 36.141 Introduction of PUSCH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912808 | Way forward on NR HST UE demodulation | CMCC | imported from 3GU |
R4‑1912809 | Way forward on NR HST PUSCH demodulation | Huawei | imported from 3GU |
R4‑1912810 | Simulation assumptions for NR FR1 normal CA UE performance requirements | Intel | imported from 3GU |
R4‑1912811 | Simulation assumptions for NR PMI reporting requirements for more than 8 Tx ports | Ericsson | imported from 3GU |
R4‑1912812 | Simulation results for NR FR2 PUSCH with 2T2R and MCS12 | ZTE | imported from 3GU |
R4‑1912813 | CR on TS38.133 for SSB settings for new gap and SMTC configurations (Section A.3.10) | MediaTek inc. | imported from 3GU |
R4‑1912814 | draftCR on test cases for Redirection from NR in FR2 to NR in FR2 (section A.7.3.2.3) | Intel Corporation | imported from 3GU |
R4‑1912815 | Update of Parameters, Test case A.7.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1912816 | Corrections to SS-RSRQ and SS-SINR OTA tests with SA | Ericsson | imported from 3GU |
R4‑1912817 | Corrections to SS-RSRQ and SS-SINR OTA tests with EN-DC | Ericsson | imported from 3GU |
R4‑1912818 | L1-RSRP accuracy test FR2 EN-DC (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1912819 | L1-RSRP accuracy test FR2 SA (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1912820 | CR on TS38.133 for E-UTRAN – NR inter-RAT measurements test case (Section A.8.5.2) | MediaTek inc. | imported from 3GU |
R4‑1912821 | Ad hoc minutes for NR V2X RRM | LGE | imported from 3GU |
R4‑1912822 | Correction on known condition of PSCell addition requirement in NE-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1912823 | Correction on known condition of PSCell addition requirement in NR DC | Huawei, HiSilicon | imported from 3GU |
R4‑1912824 | Draft CR to 38.133 NR reporting criteria | ZTE | imported from 3GU |
R4‑1912825 | CR to 36.133 on NR reporting criteria | ZTE | imported from 3GU |
R4‑1912826 | LS on sidelink synchronization under multiple synchronization sources with different timing | Qualcomm | imported from 3GU |
R4‑1912827 | Draft CR for cross link interference measurements (scetion 9) | LG Electronics Inc. | imported from 3GU |
R4‑1912828 | Link-level simulation assumptions for NR V2X synchronization | MediaTek inc., LG Electronics | imported from 3GU |
R4‑1912829 | Way forward on scope on NR IAB RRM requirements | Qualcomm | imported from 3GU |
R4‑1912830 | Reply LS on NR fast SCell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912831 | CR: Updates for NR RMC | Huawei, HiSilicon | imported from 3GU |
R4‑1912832 | Way forward on on PDSCH CA normal demodulation requirements | Intel | imported from 3GU |
R4‑1912833 | Way forward on PMI reporting requirements for Tx ports larger than 8 and up to 32 | Ericsson | imported from 3GU |
R4‑1912834 | Way forward on PMI reporting requirements for Tx ports larger than 8 and up to 32 | Ericsson | imported from 3GU |
R4‑1912835 | Way forward on introducing alternative test direction for NR FR2 UE demodulation | Qualcomm, Samsung, vivo, Xiaomi, LGE, Intel, Keysight, R&S, CAICT | imported from 3GU |
R4‑1912836 | WF on gNB RRM requirements for NR positioning | Intel, Qualcomm, NTT Docomo, Apple, MTK, CATT,CMCC | imported from 3GU |
R4‑1912837 | Way forward on R16 NR RRM enh – BWP switching on multiple CCs | Ericsson | imported from 3GU |
R4‑1912838 | Way forward on R16 NR RRM enhancements – SRS carrier switching | ZTE, Huawei, HiSilicon, MediaTek, Apple, Intel | imported from 3GU |
R4‑1912839 | Way forward on R16 NR RRM enhancements – CGI reading | ZTE | imported from 3GU |
R4‑1912840 | Way forward on R16 NR RRM enhancements – mandatory gap patterns | ZTE | imported from 3GU |
R4‑1912841 | Link level simulation assumption on cell identification in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1912842 | Link level simulation assumption on measurement accuracy in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1912843 | Correction on inter-frequency RSTD measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912844 | CR for SCell activation delay in FR2 | MediaTek inc. | imported from 3GU |
R4‑1912845 | Correction to S-measure threshold applicability in IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912846 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912847 | Way forward on R16 NR RRM enhancements – CGI reading | ZTE | imported from 3GU |
R4‑1912848 | Simulation results collection of multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1912849 | Way forward on RRM requirements for LTE-based 5G terrestrial broadcast | Qualcomm | imported from 3GU |
R4‑1912850 | Adding interruption length requirements for dormant state transition R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1912851 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1912852 | void | void | imported from 3GU |
R4‑1912853 | void | void | imported from 3GU |
R4‑1912854 | void | void | imported from 3GU |
R4‑1912855 | void | void | imported from 3GU |
R4‑1912856 | void | void | imported from 3GU |
R4‑1912857 | void | void | imported from 3GU |
R4‑1912858 | void | void | imported from 3GU |
R4‑1912859 | void | void | imported from 3GU |
R4‑1912860 | void | void | imported from 3GU |
R4‑1912861 | void | void | imported from 3GU |
R4‑1912862 | DraftCR for Adding SDL to 38.307 | Dish Network | imported from 3GU |
R4‑1912863 | Adding band n71 to 4 Rx antenna ports support in 38.101-1 | T-Mobile USA Inc. | imported from 3GU |
R4‑1912864 | WF on dynamic spectrum sharing for LTE refarming bands | Samsung, Apple | imported from 3GU |
R4‑1912865 | Coexistence simulation results in licensed bands | LG Electronics France | imported from 3GU |
R4‑1912866 | LS on UL wideband operation for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912867 | CEPT activities on measurement of 5G AAS in the field | CEPT ECC WG SE | imported from 3GU |
R4‑1912868 | WF on the punctured channel emission requirements | Charter | imported from 3GU |
R4‑1912869 | WF on the guard band for NR-U | Nokia | imported from 3GU |
R4‑1912870 | WF on the NR-U channel raster on 5GHz band | Ericsson | imported from 3GU |
R4‑1912871 | WF for sync raster for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912872 | WF on NR-U BS Rx FRC | ZTE Corporation | imported from 3GU |
R4‑1912873 | Reply LS on UL-SL prioritization for NR V2X operation | LG Electronics France | imported from 3GU |
R4‑1912874 | LS reply on NR V2X cross-RAT configuration | Huawei, HiSilicon | imported from 3GU |
R4‑1912875 | Views on NR V2X S-SSB and PSFCH | Intel Corporation | imported from 3GU |
R4‑1912876 | Draft LS on simulteaneous transmission of PSFCH | Qualcomm Incorporated | imported from 3GU |
R4‑1912877 | TP on the operating scenarios for NR V2X Service | LG Electronics France | imported from 3GU |
R4‑1912878 | [V2X] TP on link level simulation mapping for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1912879 | TP to TR 38.886 for coexistence simulation results | LG Electronics France | imported from 3GU |
R4‑1912880 | WF for channel raster and sync raster for NR V2X for band n47 and licensed bands | vivo | imported from 3GU |
R4‑1912881 | Draft CR for TS 38.101-1: Removing CA configurations for CA_n77D/E, CA_n78D/E, and CA_n79D/E | MediaTek Inc. | imported from 3GU |
R4‑1912882 | Draft CR to TS 38.101-3 on inter-band CA, EN-DC, NE-DC and NR-DC configurations | ZTE Corporation | imported from 3GU |
R4‑1912883 | Draft CR to 38.101-3 Missing Harmonic Mixing MSD for DC_3_n77/n78 | Qualcomm Incorporated | imported from 3GU |
R4‑1912884 | Draft CR for 38.101-3 EN-DC DL Synchronous Carriers | Qualcomm Incorporated | imported from 3GU |
R4‑1912885 | Draft CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc., Qualcomm Inc. | imported from 3GU |
R4‑1912886 | Draft reply LS on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1912887 | TP on General Tx/Rx requirements for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1912888 | Reply LS on AGC settling time and RB size of PSFCH | LG Electronics Finland | imported from 3GU |
R4‑1912889 | TR skeleton for IAB | Samsung | imported from 3GU |
R4‑1912890 | WF on system parameter for IAB | Samsung | imported from 3GU |
R4‑1912891 | simulation results for FR2 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1912892 | TP to TR 38.883: FR2 DL 256QAM link level simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912893 | TP to TR 38.883: Section 5.2.1 Link level simulation | Ericsson | imported from 3GU |
R4‑1912894 | TP to TR 38.883: Section 5 System level simulation | Ericsson | imported from 3GU |
R4‑1912895 | TP to TR 38.883 on BS implementation aspects | China Telecom | imported from 3GU |
R4‑1912896 | TP for TR 38.883: Conclusion for the feasibility study of FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1912897 | WF on full power transmission for eMIMO | vivo | imported from 3GU |
R4‑1912898 | WF on simulation assumption for PI/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1912899 | TP to TR 38.827 v0.3.0 on temperature and voltage conditions | OPPO | imported from 3GU |
R4‑1912900 | TP to TR 38.827 on RMC for NR MIMO OTA | Samsung, CAICT | imported from 3GU |
R4‑1912901 | TR38.827 v0.4.0 NR MIMO OTA | CAICT | imported from 3GU |
R4‑1912902 | TP to TR 38.827 v0.4.0 on Base Station beamforming configuration | CAICT | imported from 3GU |
R4‑1912903 | Work plan for FR2 test method enhancement | Apple Inc., CAICT | imported from 3GU |
R4‑1912904 | Ad-hoc minutes on switching period between case 1 and case 2 | China Telecom | imported from 3GU |
R4‑1912905 | Ad-hoc minutes on switching period between case 1 and case 2 | China Telecom | imported from 3GU |
R4‑1912906 | WF on the scope of FR1 UE RF requirement | Huawei | imported from 3GU |
R4‑1912907 | Draft CR for intra-band DL contiguous CA RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1912908 | Intra-band Contiguous ULCA MPR for FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1912909 | WF on Intra-band Contiguous ULCA MPR | Qualcomm Inc, Skyworks | imported from 3GU |
R4‑1912910 | 29 dBm HPUE regulatory aspects | Sprint Corporation | imported from 3GU |
R4‑1912911 | NSA FDD-TDD HPUE adhoc minutes | CHTTL | imported from 3GU |
R4‑1912912 | WF on FDD TDD HPUE | China Unicom | imported from 3GU |
R4‑1912913 | Meeting minutes for Rel-15 FR1 UE RF Ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1912914 | Ad-hoc meeting minute for FR2 UE RF CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912915 | Additional Requirements Needed for Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1912916 | Draft CR for correction on NW signnaling achitecture for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912917 | Draft CR for correction on NW signnaling achitecture for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1912918 | WF on Rel-15 EN-DC power class | vivo, Sprint, CMCC, OPPO, Skyworks | imported from 3GU |
R4‑1912919 | WF on PC2 fallback | OPPO, NTT DoCoMo | imported from 3GU |
R4‑1912920 | Draft CR for 38.101-3 EN-DC MPR and AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1912921 | WF on Transient period capability | Qualcomm Incorporated | imported from 3GU |
R4‑1912922 | Further discussions on Emission Mask Considerations for NR-U DL single wideband carrier operation modes | Charter Communications, Inc | imported from 3GU |
R4‑1912923 | Minutes of Ad-hoc for Rel-15 NR BS RF maintenance | Ericsson | imported from 3GU |
R4‑1912924 | dCR to 38.101-1: DMRS Exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1912925 | void | void | imported from 3GU |
R4‑1912926 | draftCR to TS 38.101-1 on undetermined Tx DC location | Qualcomm | imported from 3GU |
R4‑1912927 | draftCR to 38.101-2 on undetermined Tx DC location | Qualcomm | imported from 3GU |
R4‑1912928 | Summary of Tx diversity and eMIMO full power transmission | Ericsson | imported from 3GU |
R4‑1912929 | LS on UE adaptation to maximum number of MIMO layers | RAN1, vivo | imported from 3GU |
R4‑1912930 | Pcmax correction for the FR2 CA | Qualcomm Incorporated | imported from 3GU |
R4‑1912931 | Draft CR for 38.101-2 draft CR on side condition for BC | Huawei, HiSilicon | imported from 3GU |
R4‑1912932 | dCR to 38.101-2: DMRS exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1912933 | Draft CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation, Qualcomm | imported from 3GU |
R4‑1912934 | Minutes on NR BS conformance testing AH | FUTUREWEI | imported from 3GU |
R4‑1912935 | Draft CR to TS 37.145-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912936 | draftCR to TR 37.843: Addition of Plane Wave Synthesizer. MU, calibration and test procedure for In-band TRP requirements. | CAICT | imported from 3GU |
R4‑1912937 | Draft CR to TS 37.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1912938 | Draft CR to TS 37.113 Correction on transient phenomena performance criteria subclause 6.2 | ZTE Corporation | imported from 3GU |
R4‑1912939 | Draft CR to TS 37.114 Correction on notes in subclause 7.1 | ZTE Corporation | imported from 3GU |
R4‑1912940 | draftCR to TS 38.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1912941 | WF on exclusion bands | ZTE Corporation | imported from 3GU |
R4‑1912942 | WF on MPE enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1912943 | WF on beam correspondence in Rel-16 | Apple Inc. | imported from 3GU |
R4‑1912944 | [Draft] LS response on Test methods for Over-the-Air Total Radiated Power field measurements for IMT radio equipment utilizing active antennas | Ericsson | imported from 3GU |
R4‑1912945 | Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1912946 | Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1912947 | Draft CR to TS38.141-2: further updates on the abbreviations (section 3.3) | ZTE Corporation | imported from 3GU |
R4‑1912948 | Draft CR to TS38.141-1: Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1912949 | Draft CR to 38.141-1 with editorial corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912950 | draft CR to TS38.141-2 Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1912951 | Draft CR to TS 38.104 to correct limit for TX spurios BS type 1-H | Ericsson | imported from 3GU |
R4‑1912952 | Draft CR to 37.145-2: OTA ACLR R15 (6.7.3) | NEC | imported from 3GU |
R4‑1912953 | Draft CR to 38.141-2: OTA ACLR (6.7.3) | NEC | imported from 3GU |
R4‑1912954 | Draft CR to TS 38.141-2: Additional information about alignment needed for TRP measurements in Annex I | Ericsson | imported from 3GU |
R4‑1912955 | Draft CR to TR 37.843: adding background information on angular alignment in subclause 10.8.4 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1912956 | Draft CR for TS38.141-1: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1912957 | Draft CR for TS38.141-2: correction on NR TM1.1 | Nokia | imported from 3GU |
R4‑1912958 | draft CR to TS 38.141-1: Correcting TM 3.3 Definition | Ericsson, Keysight | imported from 3GU |
R4‑1912959 | Corrections to EVM 38.141-1 Annex H.7 | Futurewei | imported from 3GU |
R4‑1912960 | Corrections to EVM 38.141-2 Annex L.7 | Futurewei | imported from 3GU |
R4‑1912961 | Frame averaging for EVM Annex B and C in TS 38.104 | Futurewei | imported from 3GU |
R4‑1912962 | Corrections to EVM 38.141-2 Annex L.4 | Futurewei | imported from 3GU |
R4‑1912963 | Draft CR to 38.141-1: Annex H.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912964 | Draft CR to 38.141-2: Annex L.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912965 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1912966 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1912967 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2 | ZTE Corporation | imported from 3GU |
R4‑1912968 | Draft CR to TS 37.104: Correction to Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1912969 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912970 | Draft CR to 38.141-2: OTA receiver intermodulation procedure (7.8) | NEC | imported from 3GU |
R4‑1912971 | Draft CR to 38.141-2: OTA transmitter spurious emissions (6.7) | NEC | imported from 3GU |
R4‑1912972 | Draft CR to 38.141-2: OTA receiver spurious emissions (7.7) | NEC | imported from 3GU |
R4‑1912973 | Draft CR to TS 38.141-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912974 | Draft CR to TS 38.141-2: correction of the multipath fading reference for BS demodulation requirements | Huawei | imported from 3GU |
R4‑1912975 | WF on UL Power Boost and IBE Relaxation | Qualcomm, Skyworks | imported from 3GU |
R4‑1912976 | WF on Region 1 Extension | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912977 | WF on EIRP and EIS for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1912978 | WF on UE RF requirements for adding channel BW to band n1 | Ericsson, Qualcomm, Huawei, China Unicom | imported from 3GU |
R4‑1912979 | WF for30 MHz channel bandwidth in Band n28 | Huawei, HiSilicon, Skyworks Solutions Inc. | imported from 3GU |
R4‑1912980 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.101-1 | CMCC | imported from 3GU |
R4‑1912981 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.104 | CMCC | imported from 3GU |
R4‑1912982 | WF for sync raster for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1912983 | LS on NR IAB case-1 timing | RAN1, ZTE | imported from 3GU |
R4‑1912984 | Way forward on the new basket WID - adding wider CBW to existing NR bands | Ericsson, Huawei | imported from 3GU |
R4‑1912985 | Framework for handling ‘brand new CHBW” request(s) | RAN4 vice chairman | imported from 3GU |
R4‑1912986 | draftCR to 38.101-3 on only synchronous NR-DC between FR1 and FR2 support in Rel-15 | Ericsson | imported from 3GU |
R4‑1912987 | Draft CR to TS 38.104 on corrections to channel raster entries for NR band | ZTE Corporation | imported from 3GU |
R4‑1912988 | Draft CR to TS 38.101-1 on corrections to channel raster entries for NR band | ZTE Corporation | imported from 3GU |
R4‑1912989 | Draft CR to TS 38.101-2 on corrections to channel raster entries for NR band | ZTE Corporation | imported from 3GU |
R4‑1912990 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912991 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912992 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912993 | Draft CR to TS 38.101-3: UL-MIMO on SUL carrier | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912994 | AH minutes for coexistence between NB-IoT and NR | Huawei, HiSilicon | imported from 3GU |
R4‑1912995 | TP for TR 37.823: Addition of n90 frequency band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1912996 | TP to the new TR related to NB-IoT: TDD configurations | ZTE Corporation | imported from 3GU |
R4‑1912997 | TP to the new TR related to NB-IoT: TAG misalignment | ZTE Corporation, Nokia | imported from 3GU |
R4‑1912998 | WF on power boosting requirement for NB-IoT operation in NR in-band | Nokia, Ericsson, Huawei, ZTE, CHTTL | imported from 3GU |
R4‑1912999 | Minutes of 7-24GHz SI adhoc | Huawei | imported from 3GU |
R4‑1913000 | Meeting minutes for Rel-16 LTE-M Coexisting with NR Ad-hoc | Ericsson | imported from 3GU |
R4‑1913001 | TP to TR 37.823 PRB Alignment | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913002 | TP to the new TR related to MTC: TAG misalignment | ZTE Corporation | imported from 3GU |
R4‑1913003 | WF on the LTE-M coexisting with NR TR structure of R16 impact | Ericsson, Nokia, ZTE, Huawei | imported from 3GU |
R4‑1913004 | TP to TR 38.820: Editorial update of draft TR 38.820 | Ericsson | imported from 3GU |
R4‑1913005 | TP to TR 38.820: system parameters for 7-24 GHz study | Futurewei | imported from 3GU |
R4‑1913006 | TP to TR38.820: corrections of deployment scenarios | Apple Inc. | imported from 3GU |
R4‑1913007 | TP to TR 38.820: Signal quality considerations for 7-24 GHz base station operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913008 | TP to TR 38.820: PA indicative ACLR values in subclause 5.5.2 | Ericsson | imported from 3GU |
R4‑1913009 | TP to TR 38.820: Technical background for BS filter technologies for 7 to 24 GHz in subclause 5.4.5 | Ericsson | imported from 3GU |
R4‑1913010 | TP to TR 38.820: Addition of filter key parameters in subclause 5.5.4 | Ericsson | imported from 3GU |
R4‑1913011 | TP to TR 38.820 updated on UE front end technology | Sony | imported from 3GU |
R4‑1913012 | TP to TR 38.820: Addition of UE noise figure and some other clarifications in subclauses 5.5.1 & 6.3.3.1 | Ericsson | imported from 3GU |
R4‑1913013 | TP to TR 38.820: Improvement of transmitter architecture in subclause 5.3.2 | Ericsson | imported from 3GU |
R4‑1913014 | TP to TR 38.820 OBUE requirement for 7-24GHz | ZTE Corporation, Ericsson | imported from 3GU |
R4‑1913015 | TP to TR 38.820 - BS output power accuracy | Huawei | imported from 3GU |
R4‑1913016 | TP to TR 38.820 - BS TX IMD | Huawei | imported from 3GU |
R4‑1913017 | TP to TR 38.820 - BS TX OFF levels | Huawei | imported from 3GU |
R4‑1913018 | TP to TR 38.820: Improvement of technical background for co-location requirements in subclause 7.4.1.2 | Ericsson | imported from 3GU |
R4‑1913019 | WF on the LTE-M coexisting with NR TR structure of R16 impact | Ericsson, Nokia, ZTE, Huawei | imported from 3GU |
R4‑1913020 | TP to TR 38.820: output power dynamics | Huawei | imported from 3GU |
R4‑1913021 | TP to TR 38.820: NR BS transmitted signal quality requirements | Huawei | imported from 3GU |
R4‑1913022 | TP to 38.820 on Spurious emission regulation for BS in 7-24 GHz | Ericsson | imported from 3GU |
R4‑1913023 | TP to TR 38.820 - BS ALCR | Huawei | imported from 3GU |
R4‑1913024 | TP to TR 38.820 - BS receiver sensitivity | Huawei | imported from 3GU |
R4‑1913025 | TP to TR 38.820: Update of technical background for BS out-of-band blocking in subclause 7.4.2.2 | Ericsson | imported from 3GU |
R4‑1913026 | TP to TR 38.820: NR BS dynamic range | Huawei | imported from 3GU |
R4‑1913027 | TP for TR 38.820 : NR UE system noise figure proposal | Qualcomm Incorporated | imported from 3GU |
R4‑1913028 | WF on UE and BS RF requirements for introducation of FDD bands with variable duplex | Huawei, HiSilicon, Vodafone, Orange | imported from 3GU |
R4‑1913029 | WF on internal TR references correction | Huawei | imported from 3GU |
R4‑1913030 | Way forward on NR Rx spurious emissions | Ericsson, NTT DOCOMO | imported from 3GU |
R4‑1913031 | Meeting minutes on AH sessions for NR V2X UE | LG Electronics | imported from 3GU |
R4‑1913032 | TP to TR 38.820: Update of BS noise figure over the 7-24 GHz range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913033 | Ad Hoc meeting minutes for power saving on MIMO layer adaption | CATT | imported from 3GU |
R4‑1913034 | TP to TR 38.820: Technical background for BS filter technologies for 7 to 24 GHz in subclause 5.4.5 | Ericsson | imported from 3GU |
R4‑1913035 | CA_n78-n79 MSD for UE supporting NR bands n78 and n79 only | Qualcomm Incorporated | imported from 3GU |
R4‑1913036 | Draft CR for 38.101-3 EN-DC RX Out-of-Band Blocking for shared bands and bands in close proximity | Qualcomm Incorporated | imported from 3GU |
R4‑1913037 | WF on power class 2 indication related to UL-MIMO | Ericsson | imported from 3GU |
R4‑1913038 | WF on n39 AMPR Values | Qualcomm Incorporated, Intel Corporation | imported from 3GU |
R4‑1913039 | CA_n78-n79 MSD for UE supporting NR bands n78 and n79 only | Qualcomm Incorporated | imported from 3GU |
R4‑1913040 | LS on switching period between case 1 and case 2 | China Telecom | imported from 3GU |
R4‑1913041 | WF on switching period between case 1 and case 2 | China Telecom | imported from 3GU |
R4‑1913042 | WF on DL Intra-band CA BW Enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1913043 | TP to TR38.831: Emissions Requirements for FR2 NC UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1913044 | WF on non-contiguous UL CA in FR2 | Apple Inc. | imported from 3GU |
R4‑1913045 | WF on FR2 Inter-band DL CA | Sony, Qualcomm Incorporated, Apple Inc., Huawei, HiSilicon | imported from 3GU |
R4‑1913046 | Minutes of 3rd FR2 UE RF AH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913047 | Minutes of 4th FR2 UE RF AH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913048 | Offline discussion on MPE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913049 | WF on beam correspondence in Rel-16 | Apple Inc., Qualcomm Incorporated, Samsung, Sony | imported from 3GU |
R4‑1913050 | Feasibility evaluation for NR FR2 DL256QAM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913051 | TP to TR 38.883 NR FR2 DL256QAM link level and system level simulation results | NTT DoComo | imported from 3GU |
R4‑1913052 | Ad-hoc meeting minute for IAB | Qualcomm | imported from 3GU |
R4‑1913053 | FR2 test method enhancement adhoc meeting notes | Apple | imported from 3GU |
R4‑1913054 | WF on FR2 Inter-band DL CA | Sony, Qualcomm Incorporated, Apple Inc., Huawei, HiSilicon | imported from 3GU |
R4‑1913055 | WF on non-contiguous UL CA in FR2 | Apple Inc. | imported from 3GU |
R4‑1913056 | WF on MPE enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1913057 | WF on MPE enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1913058 | Meeting minutes for NR-U Ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1913059 | WF on the punctured channel emission requirements | Charter | imported from 3GU |
R4‑1913060 | WF on the guard band for NR-U | Nokia | imported from 3GU |
R4‑1913061 | Reply LS on simultaneous transmission of PSFCH | Qualcomm Incorporated | imported from 3GU |
R4‑1913062 | TP on the operating scenarios for NR V2X Service | LG Electronics France | imported from 3GU |
R4‑1913063 | LS on sync raster for NR V2X | vivo | imported from 3GU |
R4‑1913064 | WF on transient period for V2X S-SSB for NR V2X | CATT | imported from 3GU |
R4‑1913065 | [V2X] TP on subclause title for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1913066 | TP to TR 38.886 for coexistence simulation results | LG Electronics France | imported from 3GU |
R4‑1913067 | Summary of Tx diversity and eMIMO full power transmission | Ericsson | imported from 3GU |
R4‑1913068 | WF on full power transmission for eMIMO | vivo | imported from 3GU |
R4‑1913069 | [V2X] TP on link level simulation mapping for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1913070 | WF on FR2 test methodology enhancement | Apple Inc., CAICT | imported from 3GU |
R4‑1913071 | TR38.884 skeleton for FR2 test method enhancement | Apple Inc. | imported from 3GU |
R4‑1913072 | Adding band n71 and n28 to 4 Rx antenna ports support in 38.101-1 | T-Mobile USA, CBN | imported from 3GU |
R4‑1913073 | WF on DSS between NR and LTE refarming band | Samsung, Apple, Comcast, CableLabs, Federated Wireless, Google | imported from 3GU |
R4‑1913074 | WF on FDD TDD HPUE | China Unicom, CHTTL,OPPO | imported from 3GU |
R4‑1913075 | WF on UE and BS RF requirements for introducation of FDD bands with variable duplex | Huawei, HiSilicon, Vodafone, Orange | imported from 3GU |
R4‑1913076 | WF on simulation assumption for PI/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1913077 | WF on FDD TDD HPUE | China Unicom, CHTTL, OPPO, China Telecom, Huawei, HiSilicon | imported from 3GU |
R4‑1913078 | n26 Emissions requirements | Sprint Corporation, SouthernLINC, Dish Network | imported from 3GU |
R4‑1913079 | Framework for handling ‘brand new CHBW” request(s) | RAN4 vice chairman | imported from 3GU |
R4‑1913080 | TR 38.820, v0.3.0: implementation of TPs from RAN4#92bis | Huawei | imported from 3GU |
page generated from database: 2024-07-20 12:15:34