3GPP TDocs (written contributions) at meeting
Meeting: R4-89 - 2018-11-12 to 2018-11-16, Spokane
meeting id: R4-89 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1814400 | Agenda for RAN4#89 | RAN4 Chairman | imported from 3GU |
R4‑1814401 | RAN4#88-Bis Meeting Report | ETSI MCC | imported from 3GU |
R4‑1814402 | LS on RSRP measurements using RSS for Rel-16 LTE-MTC | RAN1, Ericsson | imported from 3GU |
R4‑1814403 | Reply LS on power class for FR1 EN-DC and NR CA | RAN1, Samsung | imported from 3GU |
R4‑1814404 | LS on wideband carrier operation for NR-U | RAN1, Ericsson | imported from 3GU |
R4‑1814405 | Reply LS on intra-band combination for NR CA and MR-DC | RAN1, Intel | imported from 3GU |
R4‑1814406 | LS on RAN1 NR UE features update | RAN1, NTT DOCOMO, INC., AT&T | imported from 3GU |
R4‑1814407 | LS on the interruption time during mobility in LTE | RAN2, Nokia | imported from 3GU |
R4‑1814408 | LS on frequency separation class | RAN2, Qualcomm | imported from 3GU |
R4‑1814409 | LS on SFN offset for OTDOA | RAN2, Intel | imported from 3GU |
R4‑1814410 | LS on MIMO layer configuration | RAN2, MediaTek | imported from 3GU |
R4‑1814411 | LS on late drop UE capabilities | RAN2, Huawei | imported from 3GU |
R4‑1814412 | Reply LS on RAN4 design on channel bandwidth | RAN2, Qualcomm | imported from 3GU |
R4‑1814413 | LS to RAN4 on uncertainties for OTA signalling test setup | RAN5, Anritsu | imported from 3GU |
R4‑1814414 | LS to RAN4 on simultaneous LTE and NR transmissions in EN-DC | RAN5, Keysight | imported from 3GU |
R4‑1814415 | LS on RAN4-RAN5 5G-NR RF pending issues during RAN5#3-5G-NR Adhoc | RAN5, NTT DOCOMO | imported from 3GU |
R4‑1814416 | Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipment | ITU-R Working Party 5D | imported from 3GU |
R4‑1814417 | CHARACTERISTICS OF IMT-ADVANCED, IMT-2020 AND ADVANCED ANTENNA SYSTEMS FOR ITU-R SHARING AND COMPATIBILITY ^^STUDIES IN THE FREQUENCY BAND 3 300-3 400 MHz | ITU-R Working Party 5D | imported from 3GU |
R4‑1814418 | CEPT/ECC developments in the 410 - 430MHz band | CEPT ECC Working Group FM | imported from 3GU |
R4‑1814419 | On Min. EIRP at target CDF for spherical coverage | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1814420 | On Beam Peak Search Measurement Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814421 | Correction to applicability of requirements for Category M1 and M2 UEs | Spirent Communications | imported from 3GU |
R4‑1814422 | Correction to applicability of requirements for Category M1 and M2 UEs | Spirent Communications | imported from 3GU |
R4‑1814423 | Baseline text proposal for TS 38.171 | Spirent Communications | imported from 3GU |
R4‑1814424 | Draft TS 38.171 | Spirent Communications | imported from 3GU |
R4‑1814425 | Simplification of requirements for EN-DC configuration including FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1814426 | Correction on REFSENS exception of CA_3A-28A-42C for REL-14 | SoftBank Corp. | imported from 3GU |
R4‑1814427 | TP to TS 38.141-1: transmitted signal quality (Section 6.5) | ZTE Corporation | imported from 3GU |
R4‑1814428 | Correction on REFSENS exception of CA_3A-28A-42C for REL-15 | SoftBank Corp. | imported from 3GU |
R4‑1814429 | TP to TS 38.141-1: Transmit ON/OFF power (Section 6.4) | ZTE Corporation | imported from 3GU |
R4‑1814430 | PDCCH demodulation requirements for 4Rx AL16 | China Telecom | imported from 3GU |
R4‑1814431 | PBCH demodulation requirements for 4Rx | China Telecom | imported from 3GU |
R4‑1814432 | Summary of ideal results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1814433 | Summary of impairment results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1814434 | Further discussion on BS test applicability for different SCS and CHBW | China Telecom | imported from 3GU |
R4‑1814435 | TP to TS 38.141-1: Measurement system set-up for BS type 1-H performance requirements | China Telecom | imported from 3GU |
R4‑1814436 | Remaining issues for NR PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1814437 | Ideal simulation results for NR PUSCH | China Telecom | imported from 3GU |
R4‑1814438 | Impairment simulation results for NR PUSCH | China Telecom | imported from 3GU |
R4‑1814439 | Draft CR to TS 38.104: Performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1814440 | TP to TS 38.141-1: Update of AWGN power level and FRC index for DFT-s-OFDM based PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1814441 | TP to TS 38.141-2: Radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1814442 | Draft CR to TS 38.104: FRC definitions for FR1 DFT-s-OFDM based PUSCH and FR2 PUSCH | China Telecom | imported from 3GU |
R4‑1814443 | TP to TS 38.141-1: FRC definitions for FR1 DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1814444 | TP to TS 38.141-2: FRC definitions for PUSCH and test parameters for PRACH | China Telecom | imported from 3GU |
R4‑1814445 | Remaining issues for NR PRACH demodulation requirements | China Telecom | imported from 3GU |
R4‑1814446 | Discussion on reply LS for LTE_feMob | China Telecom | imported from 3GU |
R4‑1814447 | Draft WID on NR performance requirement enhancement | China Telecom | imported from 3GU |
R4‑1814448 | TP to TS 38.141-2: OTA transmitter OFF power (Section 6.5.1) | ZTE Corporation | imported from 3GU |
R4‑1814449 | TP to TS 38.141-2: OTA transmitted signal quality (Section 6.6) | ZTE Corporation | imported from 3GU |
R4‑1814450 | Further discussion on FR2 OTA TDD transient time | ZTE Corporation | imported from 3GU |
R4‑1814451 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1814452 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1814453 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1814454 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1814455 | CR for PDSCH demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1814456 | New WID Generic requirements for NR intra-band contiguous CA for FR1 Rel-16 | China Telecom | imported from 3GU |
R4‑1814457 | New WID Add support of DL 256QAM for NR FR2 | China Telecom | imported from 3GU |
R4‑1814458 | Motivations on NR DL 256QAM support for FR2 | China Telecom | imported from 3GU |
R4‑1814459 | MSD analysis for DC band combination of Band 5, 41 and n79 | China Telecom | imported from 3GU |
R4‑1814460 | TP for TR 37.716-21-11: RefSens requirement for DC band combination of Band 5, 41 and n79 | China Telecom | imported from 3GU |
R4‑1814461 | TP for TR 37.716-41-11: DC band combination of Band 1, 3, 5, 41 and n79 | China Telecom | imported from 3GU |
R4‑1814462 | Darft CR for EN-DC MTTD and MRTD requirement (section 7.5 and 7.6) | Samsung | imported from 3GU |
R4‑1814463 | CR for correction on measurement gap sharing in EN-DC | Samsung | imported from 3GU |
R4‑1814464 | Draft CR for further clarification on measurement gap sharing (section 9.1.2) | Samsung | imported from 3GU |
R4‑1814465 | Darft CR for adding note on applicability of value RSRP_127 (section 10.1.6) | Samsung | imported from 3GU |
R4‑1814466 | Reply LS on frequency separation class | Samsung | imported from 3GU |
R4‑1814467 | Draft CR for correction of random access test cases for FR1 (section A.4.3.2.2 and A.6.3.2.2) | Samsung | imported from 3GU |
R4‑1814468 | Draft CR for correction of random access test cases for FR2 (section A.5.3.2.2 and A.7.3.2.2) | Samsung | imported from 3GU |
R4‑1814469 | Remaining issues for random access test cases | Samsung | imported from 3GU |
R4‑1814470 | Draft CR for correction of test cases on inter-frequency FR1 RSRQ measurement accuracy (section A.4.7.2 and A.6.7.2) | Samsung | imported from 3GU |
R4‑1814471 | Draft CR for correction of test cases on inter-frequency FR2 RSRQ measurement accuracy (section A.5.7.2 and A.7.7.2) | Samsung | imported from 3GU |
R4‑1814472 | Discussion on RRM testing methodology | Samsung | imported from 3GU |
R4‑1814473 | Reply LS on the interruption time during mobility in LTE | Samsung | imported from 3GU |
R4‑1814474 | Discussion and simulation results for NR PUSCH | Samsung | imported from 3GU |
R4‑1814475 | Discussion and simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1814476 | Discussion and simulation results for NR PRACH | Samsung | imported from 3GU |
R4‑1814477 | Draft CR on PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1814478 | TP for TS 38.141-1 on NR PUCCH format2 conducted performance requirements | Samsung | imported from 3GU |
R4‑1814479 | TP for TS 38.141-2 on NR PUCCH format2 radiated performance requirements | Samsung | imported from 3GU |
R4‑1814480 | Conclusion of T-put results | Samsung | imported from 3GU |
R4‑1814481 | Analysis of UE distinction methodology | Samsung | imported from 3GU |
R4‑1814482 | Simulation results summary for NR CSI (FR1 TDD) | Samsung | imported from 3GU |
R4‑1814483 | Simulation results summary for NR CSI (FR1 FDD) | Samsung | imported from 3GU |
R4‑1814484 | Simulation results summary for NR CSI (FR2 TDD) | Samsung | imported from 3GU |
R4‑1814485 | Simulation assumption for NR UE CSI requirements | Samsung | imported from 3GU |
R4‑1814486 | Simulation results for PDSCH (FR1) | Samsung | imported from 3GU |
R4‑1814487 | TP for TS38.101-4 section 2 (Reference) | Samsung | imported from 3GU |
R4‑1814488 | TP for TS38.101-4 section 3 (Definitions, symbols and abbreviations) | Samsung | imported from 3GU |
R4‑1814489 | Simulation results for PDSCH (FR2) | Samsung | imported from 3GU |
R4‑1814490 | Open issues of CSI test cases | Samsung | imported from 3GU |
R4‑1814491 | Simulation results for CQI test cases | Samsung | imported from 3GU |
R4‑1814492 | Simulation results for PMI test cases | Samsung | imported from 3GU |
R4‑1814493 | Simulation results for RI test cases | Samsung | imported from 3GU |
R4‑1814494 | Introduction of NR band protection in TS36.101 | Samsung | imported from 3GU |
R4‑1814495 | Introduction of NR band protection in TS25.101 | Samsung | imported from 3GU |
R4‑1814496 | Introduction of NR band protection in TS25.102 | Samsung | imported from 3GU |
R4‑1814497 | Correction on UL MIMO requirement for PC1 UE | Samsung | imported from 3GU |
R4‑1814498 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1814499 | Draft CR to TS 38.104: Some corrections on OTA RX requirement related to multi-band operation | ZTE Corporation | imported from 3GU |
R4‑1814500 | Draft CR to TS 38.104: Transmitter OFF power for CA (Section 6.4.1&9.5.2) | ZTE Corporation | imported from 3GU |
R4‑1814501 | TP to TS38.141-2: OTA ACLR (Section 6.7.3) | ZTE Corporation | imported from 3GU |
R4‑1814502 | TP to TS38.141-2: OTA total power dynamic range(Section 6.4.3) | ZTE Corporation | imported from 3GU |
R4‑1814503 | TP to TS38.141-2: OTA UEM for BS type 1-O(Section 6.7.4.5) | ZTE Corporation | imported from 3GU |
R4‑1814504 | TP to TS38.141-2: Removal of the multi-band test for BS type 2-O | ZTE Corporation | imported from 3GU |
R4‑1814505 | TP for TR38.716-02-00: MSD requirements due to cross band isolation for 1UL/2UL for CA_n3-n41 | ZTE Corporation, CMCC | imported from 3GU |
R4‑1814506 | Draft CR to TS38.104_Transmitter intermodulation(Section 6.7 and 9.8) | ZTE Corporation | imported from 3GU |
R4‑1814507 | TP to TS 38.141-1_Corrections on transmitter intermodulation (section 3.2 and 6.7) | ZTE Corporation | imported from 3GU |
R4‑1814508 | TP to TS 38.141-2_Corrections on transmitter intermodulation (section 3.2 and 6.8) | ZTE Corporation | imported from 3GU |
R4‑1814509 | Clarification on MSD and uplink configuration tables for EN DC and NR CA | ZTE Corporation | imported from 3GU |
R4‑1814510 | Draft CR to TS38.101-1_Clarifications on MSD and UL configuration tables for inter-band CA | ZTE Corporation | imported from 3GU |
R4‑1814511 | Draft CR to TS38.101-3_Clarifications on MSD and UL configuration tables for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1814512 | Draft CR to TS38.101-3_Corrections on MSD requirments for EN-DC combinations of band 8 and n77 n78(Section 7.3B.2.3.1) | ZTE Corporation | imported from 3GU |
R4‑1814513 | EIRP measurement grids with test time | Samsung | imported from 3GU |
R4‑1814514 | Draft CR to TR 38.810: EIRP measurement grids | Samsung | imported from 3GU |
R4‑1814515 | TP to TS 38.141-2: OTA transmitter transient period (Section 6.5.2) | ZTE Corporation | imported from 3GU |
R4‑1814516 | Timing alignment for intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1814517 | Correction to FDD-FS3 Intra-frequency event triggered reporting in DRX | ANRITSU LTD | imported from 3GU |
R4‑1814518 | Correction to FDD-FS3 Intra-frequency event triggered reporting in DRX | ANRITSU LTD | imported from 3GU |
R4‑1814519 | Correction to FDD-FS3 Intra-frequency event triggered reporting in DRX | ANRITSU LTD | imported from 3GU |
R4‑1814520 | Correction to DL CA Activation and Deactivation Test cases | ANRITSU LTD | imported from 3GU |
R4‑1814521 | Measurement time savings for multi-beam 3D EIRP scans using beam sweeping | Fraunhofer HHI, Fraunhofer IIS, Spirent | imported from 3GU |
R4‑1814522 | FR2 demod: Noc level and Band groups | ANRITSU LTD | imported from 3GU |
R4‑1814523 | FR2 demod: Noc, Band groups and Ref point - TP for TS 38.101-4 | ANRITSU LTD | imported from 3GU |
R4‑1814524 | FR2 demod: Noc and Band groups update | ANRITSU LTD | imported from 3GU |
R4‑1814525 | Noc and SNR range for UE RRM test cases with 1 AoA | ANRITSU LTD | imported from 3GU |
R4‑1814526 | RRM update, 1 AoA with signal coming from the RX beam peak direction | ANRITSU LTD | imported from 3GU |
R4‑1814527 | Discussion about inter-frequency accuracy requirement | Intel Corporation | imported from 3GU |
R4‑1814528 | Discussion about NR RLM remaining issue | Intel Corporation | imported from 3GU |
R4‑1814529 | Discussion about RRM performance requirement test for FR2 | Intel Corporation | imported from 3GU |
R4‑1814530 | Discussion about L1-RSRP measurement requirement for beam management | Intel Corporation | imported from 3GU |
R4‑1814531 | Discussion about SNR levels for SSB RLM test | Intel Corporation | imported from 3GU |
R4‑1814532 | Discussion about SNR levels for CSI-RS RLM test | Intel Corporation | imported from 3GU |
R4‑1814533 | On UE timing adjustment with beam switching | Intel Corporation | imported from 3GU |
R4‑1814534 | On MRTD and MTTD requirements for intra-band synchronous EN-DC | Intel Corporation | imported from 3GU |
R4‑1814535 | On remaining issues for BWP switching delay | Intel Corporation | imported from 3GU |
R4‑1814536 | CR on BWP switching requirement in TS38.133 (Section 8.6) | Intel Corporation | imported from 3GU |
R4‑1814537 | On remaining issues for interruption due to BWP switching | Intel Corporation | imported from 3GU |
R4‑1814538 | Cleanup on short MGL supporting in SA MG applicability (section 9.1.2) | Intel Corporation | imported from 3GU |
R4‑1814539 | CR on test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Intel Corporation | imported from 3GU |
R4‑1814540 | CR on test cases for inter-frequency measurement in EN-DC with PScell in FR2 (section A.5.6.2) | Intel Corporation | imported from 3GU |
R4‑1814541 | CR on test cases for inter-frequency measurement in SA with PCell in FR1 (section A.6.6.2) | Intel Corporation | imported from 3GU |
R4‑1814542 | CR on test cases for inter-frequency measurement in SA with PCell in FR2 (section A.7.6.2) | Intel Corporation | imported from 3GU |
R4‑1814543 | Motivation to introduce new SI of measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑1814544 | New SID measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑1814545 | CR on applicability requirement for non-BL CE UE in R14 | Intel Corporation | imported from 3GU |
R4‑1814546 | CR on applicability requirement for non-BL CE UE in R15 | Intel Corporation | imported from 3GU |
R4‑1814547 | Views on EN-DC interworking NR UE performance requirements | Intel Corporation | imported from 3GU |
R4‑1814548 | Views on NR UE Demodulation and CSI requirements applicability | Intel Corporation | imported from 3GU |
R4‑1814549 | Views on NR MIMO layer configuration | Intel Corporation | imported from 3GU |
R4‑1814550 | Draft LS reply on NR MIMO layer configuration | Intel Corporation | imported from 3GU |
R4‑1814551 | On NR V2X RF and RRM characteristics | Intel Corporation | imported from 3GU |
R4‑1814552 | Comibned CR to TR 38.810 after RAN4 #88bis and RAN4 #89 | Intel Corporation | imported from 3GU |
R4‑1814553 | Remaining details of the NR FR2 RRM testing methodology | Intel Corporation | imported from 3GU |
R4‑1814554 | Remaining details of the NR FR2 UE Demodulation testing methodology | Intel Corporation | imported from 3GU |
R4‑1814555 | Draft CR to TR 38.810 – Test methods applicability to FR2 UE power classes | Intel Corporation | imported from 3GU |
R4‑1814556 | Discussion on the situation for the reply LS on intra-band combination for NR CA and MR-DC (R4- 1813862) in RAN4#88Bis | Intel Corporation | imported from 3GU |
R4‑1814557 | Updated LS on intra-band combination for NR CA and MR-DC | Intel Corporation | imported from 3GU |
R4‑1814558 | Phase discontinuity issue in intra-band EN-DC with 1-PA | Intel Corporation | imported from 3GU |
R4‑1814559 | Requirements in fading channel conditions with 1024QAM | Intel Corporation | imported from 3GU |
R4‑1814560 | SDR Requirements with 1024QAM | Intel Corporation | imported from 3GU |
R4‑1814561 | CQI Reporting requirements with 1024QAM | Intel Corporation | imported from 3GU |
R4‑1814562 | On Remaining issues for Beam Failure Detection | Intel Corporation | imported from 3GU |
R4‑1814563 | On Remaining issues for Candidate Beam Detection | Intel Corporation | imported from 3GU |
R4‑1814564 | On testcases for Beam failure detection and link recovery | Intel Corporation | imported from 3GU |
R4‑1814565 | NR PDCCH simulation results | Intel Corporation | imported from 3GU |
R4‑1814566 | NR PDCCH UE Demodulation Requirements | Intel Corporation | imported from 3GU |
R4‑1814567 | NR PBCH UE Performance Requirements | Intel Corporation | imported from 3GU |
R4‑1814568 | eV2X UE normal PSSCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1814569 | CR on eV2X UE soft buffer and SDR requirements | Intel Corporation | imported from 3GU |
R4‑1814570 | UE demodulation requirements for network-based CRS interference mitigation | Intel Corporation | imported from 3GU |
R4‑1814571 | NR PDSCH UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1814572 | NR PDSCH simulation results | Intel Corporation | imported from 3GU |
R4‑1814573 | Summary of PDSCH simulation results of NR UE demod (FR1 FDD) | Intel Corporation | imported from 3GU |
R4‑1814574 | Summary of PDSCH simulation results of NR UE demod (FR1 TDD) | Intel Corporation | imported from 3GU |
R4‑1814575 | Summary of PDSCH simulation results of NR UE demod (FR2) | Intel Corporation | imported from 3GU |
R4‑1814576 | NR SDR performance requirements | Intel Corporation | imported from 3GU |
R4‑1814577 | TP to TS 38.101-4: FR1 PDSCH demodulation requirements (5.2) | Intel Corporation | imported from 3GU |
R4‑1814578 | TP to TS 38.101-4: FR1 SDR requirements (5.5) | Intel Corporation | imported from 3GU |
R4‑1814579 | TP to TS 38.101-4: Annex A Measurement channels - PDSCH | Intel Corporation | imported from 3GU |
R4‑1814580 | TP to TS 38.101-4: Annex A Measurement channels - DL Control | Intel Corporation | imported from 3GU |
R4‑1814581 | TP to TS 38.101-4: Annex A Measurement channels - CSI | Intel Corporation | imported from 3GU |
R4‑1814582 | CA MPR in FR2 | Intel Corporation | imported from 3GU |
R4‑1814583 | UL CA in FR2 | Intel Corporation | imported from 3GU |
R4‑1814584 | On Beam Correspondence requirements | Intel Corporation | imported from 3GU |
R4‑1814585 | Draft CR to TS 38.101-2 UL CA power control in FR2 | Intel Corporation | imported from 3GU |
R4‑1814586 | Considerations on Scell activation delay in FR2 | Intel Corporation | imported from 3GU |
R4‑1814587 | CR on Scell activation delay in FR2 in TS38.133 | Intel Corporation | imported from 3GU |
R4‑1814588 | Further discussion on measurement requirements in NR RRC_IDLE | Intel Corporation | imported from 3GU |
R4‑1814589 | CR for NR idle/inactive measurement requirements in TS38.133 | Intel Corporation | imported from 3GU |
R4‑1814590 | Test case for handover to FR1 NR cell (A.6.3.1) | Intel | imported from 3GU |
R4‑1814591 | Test case for handover to FR2 NR cell (A.7.3.1) | Intel | imported from 3GU |
R4‑1814592 | CR on TS38.133 for threshold in RRC re-establishment requirements (Section 6.2.1) | Intel | imported from 3GU |
R4‑1814593 | Discussion on inter-RAT RSTD measurement | Intel | imported from 3GU |
R4‑1814594 | CR on inter-RAT RSTD requirement (Section 9.4.4) | Intel | imported from 3GU |
R4‑1814595 | CR on Timing advance Test for EN-DC (A.4.4.3 & A.5.4.3) | Intel | imported from 3GU |
R4‑1814596 | CR on Timing advance Test for SA (A.6.4.3 & A.7.4.3) | Intel | imported from 3GU |
R4‑1814597 | Nominal channel spacing for NR CA | Intel Corporation | imported from 3GU |
R4‑1814598 | ACS and IBB intra-band contiguous requirements for all BW Classes | Intel Corporation | imported from 3GU |
R4‑1814599 | Out of Band Blocking intra-band contiguous requirements for all BW Classes | Intel Corporation | imported from 3GU |
R4‑1814600 | LTE and NR band combinations definition | Intel Corporation | imported from 3GU |
R4‑1814601 | CR to 38.104 (5.3.4) RB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1814602 | Inter-band EN-DC - Pcmax testing | InterDigital, Inc. | imported from 3GU |
R4‑1814603 | Intra-band EN-DC - Pcmax | InterDigital, Inc. | imported from 3GU |
R4‑1814604 | New WID on introduction of n48 | US Cellular Corporation | imported from 3GU |
R4‑1814605 | DraftCR to TR38.810 to update TRP Measurement Grids Annex | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814606 | CR to TS 37.141: Clarification on NB-IoT test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814607 | CR to TS 37.141: Clarification on NB-IoT test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814608 | CR to TS 37.141: Clarification on NB-IoT test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814609 | Proposals on manufacturer declarations for AAS conducted requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814610 | CR to TS 37.145-1: Manufacturer declarations for AAS conducted requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814611 | Proposals on manufacturer declarations for AAS radiated requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814612 | CR to TS 37.145-2: Manufacturer declarations for AAS radiated requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814613 | Draft CR to TS 37.843: Measurement uncertainty for Out-of-band Blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814614 | UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814615 | CR to TS 36.101: Implementation of UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1814616 | CR to TS 36.104: Implementation of UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1814617 | CR to TS 36.141: Implementation of UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1814618 | UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814619 | Draft CR to TS 38.817-02: Measurement uncertainty for Out-of-band Blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814620 | TP to TS 38.141-1 on Characteristics of the interfering signals | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814621 | TP to TS 38.141-1 on manufacturer declarations for NR conducted requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814622 | TP to TS 38.141-2 on Characteristics of the interfering signals | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814623 | TP to TS 38.141-2 on manufacturer declarations for NR radiated requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814624 | Summary of simulation results for eV2X demodulation requirements | CATT | imported from 3GU |
R4‑1814625 | CR for eV2X single link PSSCH tests and PSCCH decoding capability test cases | CATT | imported from 3GU |
R4‑1814626 | Simulation results for eV2X test cases | CATT | imported from 3GU |
R4‑1814627 | Simulation results for NR PDCCH | CATT | imported from 3GU |
R4‑1814628 | TP to TS38.101-4 Section 7.3: PDCCH demodulation requirements | CATT | imported from 3GU |
R4‑1814629 | Simulation results for NR PUSCH | CATT | imported from 3GU |
R4‑1814630 | Simulation results for NR PUCCH | CATT | imported from 3GU |
R4‑1814631 | Simulation results for NR PRACH | CATT | imported from 3GU |
R4‑1814632 | Draft CR for TS38.104: Performance requirements for PRACH | CATT | imported from 3GU |
R4‑1814633 | TP to TS38.141-1: Performance requirements for PRACH | CATT | imported from 3GU |
R4‑1814634 | TP to TS38.141-2: Performance requirements for PRACH | CATT | imported from 3GU |
R4‑1814635 | Draft CR for TS38.104: Correction on OTA transmitter and receiver intermodulation | CATT | imported from 3GU |
R4‑1814636 | Draft CR for TS37.105: Clean up multi-band RIBs | CATT | imported from 3GU |
R4‑1814637 | TP to TS 38.141-1: Correction on power boosting for FR1 test model | CATT | imported from 3GU |
R4‑1814638 | Discussion on EIRP OFF power for measuring FR2 transient period | CATT | imported from 3GU |
R4‑1814639 | Further discussion on Scell activation requirements in FR2 | CATT | imported from 3GU |
R4‑1814640 | CR on Scell activation requirements in FR2 | CATT | imported from 3GU |
R4‑1814641 | CR on MTTD and MRTD for inter-band CA | CATT | imported from 3GU |
R4‑1814642 | Test cases for SCell activation/deactivation in SA | CATT | imported from 3GU |
R4‑1814643 | Test cases for BWP switching in SA | CATT | imported from 3GU |
R4‑1814644 | Correction and updates to test cases for interruption at transitions in EN-DC | CATT | imported from 3GU |
R4‑1814645 | Correction and updates to test cases for interruption due to deactivated SCell operations in EN-DC | CATT | imported from 3GU |
R4‑1814646 | Further discussion on Pcmax for inter band EN-DC on FR1 | CATT | imported from 3GU |
R4‑1814647 | Pcmax requirement for inter band EN-DC on FR1 | CATT | imported from 3GU |
R4‑1814648 | Evaluation for 2 RX exception in Rel-15 for vehicle mounted UE | CATT | imported from 3GU |
R4‑1814649 | NR V2X RF operating parameters for RAN1 evaluation | CATT | imported from 3GU |
R4‑1814650 | TP for TR38.716-02-00: Inerferenc analysis and reuiqrements for inter-band CA_n8-n41 | CATT | imported from 3GU |
R4‑1814651 | TP for TR38.716-02-00: Interference analysis and requirements for inter-band CA_n41-n79 | CATT | imported from 3GU |
R4‑1814652 | TP for 37.716-11-11: MSD for inter-band EN DC_3A-n41A | CATT | imported from 3GU |
R4‑1814653 | TP for 37.716-11-11: Interference analysis and requirements for inter-band EN DC_39A-n41A | CATT | imported from 3GU |
R4‑1814654 | PDSCH Performance with LTE NR Coexistence | AT&T | imported from 3GU |
R4‑1814655 | On wideband carrier operation for NR-U | AT&T | imported from 3GU |
R4‑1814656 | Beam Correspondence for Rel-15 | Sony, Ericsson | imported from 3GU |
R4‑1814657 | UE RSRP accuracy and RAN5 OTA Signalling test cases for FR2 | ANRITSU LTD | imported from 3GU |
R4‑1814658 | Intra-frequency Relative SS RSRP Accuracy for FR2 | ANRITSU LTD | imported from 3GU |
R4‑1814659 | Correction of MPR for NB-IoT Power Class 6 Rel-14 | Sony | imported from 3GU |
R4‑1814660 | Correction of MPR for NB-IoT Power Class 6 Rel-15 | Sony | imported from 3GU |
R4‑1814661 | Simulation results and discussion on NR CQI reporting under AWGN conditions | Intel Corporation | imported from 3GU |
R4‑1814662 | Simulation results and discussion on NR CQI reporting under fading conditions | Intel Corporation | imported from 3GU |
R4‑1814663 | Simulation results and discussion on NR PMI reporting | Intel Corporation | imported from 3GU |
R4‑1814664 | Simulation results and discussion on NR RI reporting | Intel Corporation | imported from 3GU |
R4‑1814665 | TP to TS 38.101-4: FR2 CQI requirements (8.2) | Intel Corporation | imported from 3GU |
R4‑1814666 | CR on clarification of applicability of performance requirements for UE supporting CE | Intel Corporation | imported from 3GU |
R4‑1814667 | CR on clarification of applicability of performance requirements for UE supporting CE | Intel Corporation | imported from 3GU |
R4‑1814668 | Discussion on eFeMTC UE demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑1814669 | Discussion on applicability of performance requirements for 8Rx UEs | Intel Corporation | imported from 3GU |
R4‑1814670 | PDSCH simulation results and discussion for 8Rx UEs | Intel Corporation | imported from 3GU |
R4‑1814671 | Simulation results and discussion for 8Rx SDR tests | Intel Corporation | imported from 3GU |
R4‑1814672 | Discussion on 8Rx UE CSI performance requirement tests | Intel Corporation | imported from 3GU |
R4‑1814673 | Clarifications to CRS-IM applicability requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1814674 | Clarifications to efeMTC CRS-IM applicability requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1814675 | Clarifications to RRM requirements for dormant SCell | Qualcomm Incorporated | imported from 3GU |
R4‑1814676 | NB-IoT RSTD accuracy tests using Type 2 NPRS - Rel14 | Qualcomm Incorporated | imported from 3GU |
R4‑1814677 | NB-IoT RSTD accuracy tests using Type 2 NPRS - Rel15 | Qualcomm Incorporated | imported from 3GU |
R4‑1814678 | PDSCH traffic pattern in 4Rx PHICH Demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑1814679 | PDSCH traffic pattern in 4Rx PHICH Demodulation test - Rel-14 | Qualcomm Incorporated | imported from 3GU |
R4‑1814680 | PDSCH traffic pattern in 4Rx PHICH Demodulation test - Rel-15 | Qualcomm Incorporated | imported from 3GU |
R4‑1814681 | Size of exclusion zones for EMC immunity for OTA AAS and NR BS 1-O | Ericsson | imported from 3GU |
R4‑1814682 | CR to TS 37.113: Exclusion Bands for Radiated Immunity Test | Ericsson | imported from 3GU |
R4‑1814683 | Draft CR to TS 37.114: Exclusion Bands for Radiated Immunity Test | Ericsson | imported from 3GU |
R4‑1814684 | Draft CR to TS 38.113: Exclusion Bands for Radiated Immunity Test | Ericsson | imported from 3GU |
R4‑1814685 | CR to TS 37.114: Clarification on Exclusion Bands for Radiated Immunity Test in FR2 | Ericsson | imported from 3GU |
R4‑1814686 | Draft CR to TS 38.113: Clarification on Exclusion Bands for Radiated Immunity Test in FR2 | Ericsson | imported from 3GU |
R4‑1814687 | CR to TS 37.113: Clarification on Radiated Immunity Test for BS capable of multi-band operation | Ericsson | imported from 3GU |
R4‑1814688 | CR to TS 37.114: Clarification on Radiated Immunity Test for BS capable of multi-band operation | Ericsson | imported from 3GU |
R4‑1814689 | Draft CR to TS 38.113: Clarification on Radiated Immunity Test for BS capable of multi-band operation | Ericsson | imported from 3GU |
R4‑1814690 | Draft CR to TS 38.113: Adjustment of Scope | Ericsson | imported from 3GU |
R4‑1814691 | Draft CR to TS 38.113: Ancillary equipment definition | Ericsson | imported from 3GU |
R4‑1814692 | Draft CR to TS 38.113: Arrangements for establishing a communication link | Ericsson | imported from 3GU |
R4‑1814693 | Draft CR to TS 38.113: Performance criteria for transient phenomena for BS | Ericsson | imported from 3GU |
R4‑1814694 | Draft CR to TS 38.113: Performance criteria for transient phenomena for Ancillary equipment | Ericsson | imported from 3GU |
R4‑1814695 | LS on NR ATF to include per branch relative phase UE measurement | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814696 | Further views on SDL+SUL pairing | AT&T | imported from 3GU |
R4‑1814697 | Draft CR to TS38.101-2 to correct UL CA scope for FR2 in Rel-15 | Apple Inc. | imported from 3GU |
R4‑1814698 | Draft CR to TS38.101-2 updating references | Apple Inc. | imported from 3GU |
R4‑1814699 | Draft CR to TS38.101-2 correcting the Pcmax requirement | Apple Inc. | imported from 3GU |
R4‑1814700 | Draft CR to TS38.101-2 introducing the CA Pcmax requirement | Apple Inc. | imported from 3GU |
R4‑1814701 | Draft CR to TS38.101-2 correcting the TPC requirement | Apple Inc. | imported from 3GU |
R4‑1814702 | Further views on extending FR2 power class requirements to multi-band UEs | Apple Inc. | imported from 3GU |
R4‑1814703 | Draft CR to TS 38.101-2: Introducing multi-band applicability for PC3 | Apple Inc. | imported from 3GU |
R4‑1814704 | Draft reply LS on frequency separation class | Intel Corporation | imported from 3GU |
R4‑1814705 | Discussion on PCmax of V2X. | Qualcomm Inc. | imported from 3GU |
R4‑1814706 | Support of 7.5 kHz carrier shift for additional operating bands | Ericsson, KDDI | imported from 3GU |
R4‑1814707 | Support of 7.5 kHz carrier shift for additional operating bands | Ericsson, KDDI | imported from 3GU |
R4‑1814708 | Reply LS on simultaneous LTE and NR transmissions in EN-DC | Ericsson | imported from 3GU |
R4‑1814709 | Verification of Pcmax for inter-band EN-DC: total transmitted power | Ericsson | imported from 3GU |
R4‑1814710 | Verification of Pcmax for inter-band EN-DC: power reduction and dropping | Ericsson | imported from 3GU |
R4‑1814711 | Configured maximum output power for inter-band EN-DC within FR1 | Ericsson | imported from 3GU |
R4‑1814712 | Verification of Pcmax for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1814713 | Completion of configured maximum output power for intra-band contiguous EN-DC | Ericsson | imported from 3GU |
R4‑1814714 | Configured maximum output power for intra-band non-contiguous EN-DC | Ericsson | imported from 3GU |
R4‑1814715 | Phase discontinuity and other “single PA” capabilities | Ericsson | imported from 3GU |
R4‑1814716 | A-MPR for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1814717 | HPUE for EN-DC | Ericsson | imported from 3GU |
R4‑1814718 | Configured maximum output power for HPUE for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1814719 | Update on RF EMF regulations of relevance for handheld devices operating in the FR2 bands | Ericsson, Sony | imported from 3GU |
R4‑1814720 | Verification of beam correspondence | Ericsson, Sony | imported from 3GU |
R4‑1814721 | P-Max indication for FR2 | Ericsson | imported from 3GU |
R4‑1814722 | LS on P-Max indication for FR2 | Ericsson | imported from 3GU |
R4‑1814723 | On the specification of PCG | Ericsson | imported from 3GU |
R4‑1814724 | Correction of PCmax requirement for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1814725 | Simulation Results for eV2X single link demodulation test | Qualcomm Inc. | imported from 3GU |
R4‑1814726 | draft CR on beam correspondence requirements in FR2 | LG Electronics | imported from 3GU |
R4‑1814727 | draft CR of MPR for Power Class 2 in FR2 | LG Electronics | imported from 3GU |
R4‑1814728 | Discussion on UE behavior on the slot before or after MG | LG Electronics | imported from 3GU |
R4‑1814729 | CR on MRTD requirement for intra-band synchronous EN-DC (section 7.6.3) | Intel Corporation | imported from 3GU |
R4‑1814730 | CR on interruption due to BWP switching requirement in TS38.133 (Section 8.2) | Intel Corporation | imported from 3GU |
R4‑1814731 | draft CR on UE behavior in the slot before or after MG | LG Electronics | imported from 3GU |
R4‑1814732 | CR for 36.133 on E-UTRAN measurement to support gap pattern 4, 6,7,8,10 (section 8.1.2.1, 8.1.2.3.1.2, 8.1.2.3.2.2, 8.17.3) | CMCC, MediaTek, Huawei, HiSilicon | imported from 3GU |
R4‑1814733 | Further discussion on the RLM test cases | CMCC | imported from 3GU |
R4‑1814734 | Discussion on DRX in EN-DC | CMCC | imported from 3GU |
R4‑1814735 | Draft CR for 38.133 on inter-frequency measurement accuracy (section 10.1.4.1, 10.1.9.1, 10.1.14.1) | CMCC | imported from 3GU |
R4‑1814736 | Draft CR for 38.133 on applicability for Gap Pattern Configurations (section 9.1.2) | CMCC | imported from 3GU |
R4‑1814737 | Discussion on beam reporting | CMCC | imported from 3GU |
R4‑1814738 | Discussion on measurement accuracy of inter-frequency measurement for FR1 | CMCC | imported from 3GU |
R4‑1814739 | New WID on NR support for high speed train scenario | CMCC | imported from 3GU |
R4‑1814740 | Motivation for NR support for High speed train scenario | CMCC | imported from 3GU |
R4‑1814741 | On UE feature: short measurement gap | CMCC | imported from 3GU |
R4‑1814742 | Updated simulation and impairment results for NR PDSCH | CMCC | imported from 3GU |
R4‑1814743 | Discussion on NR PDCCH demodulation requirements for AL16 | CMCC | imported from 3GU |
R4‑1814744 | Further discussion on NR PBCH demodulation requirements | CMCC | imported from 3GU |
R4‑1814745 | Summary results for alignment and impairments of NR PBCH demodulation tests in Rel-15 | CMCC | imported from 3GU |
R4‑1814746 | Updated simulation and impairment results for NR PUSCH | CMCC | imported from 3GU |
R4‑1814747 | Updated simulation and impairment results for NR PUCCH | CMCC | imported from 3GU |
R4‑1814748 | Updated simulation and impairment results for NR PRACH | CMCC | imported from 3GU |
R4‑1814749 | Motivation for Power Class 2 UE for EN-DC (1 LTE band +1 NR band) | CMCC | imported from 3GU |
R4‑1814750 | New WID on Power Class 2 UE for EN-DC (1 LTE band +1 NR band) | CMCC | imported from 3GU |
R4‑1814751 | FR1 pi/2 BPSK Power Boost and n41 | CMCC, Qualcomm | imported from 3GU |
R4‑1814752 | DraftCR to TS 38.101-1 pi/2 BPSK in n41 | CMCC,Qualcomm | imported from 3GU |
R4‑1814753 | Discussion on OTA TDD transient time for FR2 | CMCC | imported from 3GU |
R4‑1814754 | Discussion on inter-band EN-DC power control | CMCC | imported from 3GU |
R4‑1814755 | draft CR on clarification of UE behavior during interrupted slots by MGL | LG Electronics | imported from 3GU |
R4‑1814756 | Conclusion of vehicle UE distinction methodology | LG Electronics Deutschland | imported from 3GU |
R4‑1814757 | Draft CR to TS 38.113 Arrangements for establishing a communication link (subclause 4.2) | ZTE Corporation | imported from 3GU |
R4‑1814758 | Draft CR to TS 38.113 Test configurations (subclause 4.5) | ZTE Corporation | imported from 3GU |
R4‑1814759 | on RX exclusion band for RI test | ZTE Corporation | imported from 3GU |
R4‑1814760 | on wanted signal power for RI test and the comparison with OTA blocking test | ZTE Corporation | imported from 3GU |
R4‑1814761 | on Conducted emission test methods at AC mains power input port | ZTE Corporation | imported from 3GU |
R4‑1814762 | CR to TS 36.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1814763 | CR to TS 37.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1814764 | Draft CR to TS 38.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1814765 | Draft CR to TS 38.113 (subclause 3.3 ) | ZTE Corporation | imported from 3GU |
R4‑1814766 | Draft CR to TS 38.113 (subclause 4.1) | ZTE Corporation | imported from 3GU |
R4‑1814767 | Draft CR on 2Rx exceptions for vehicle mounted NR UE | LG Electronics Deutschland | imported from 3GU |
R4‑1814768 | TR 36.716-03-02 v0.2.0 update: LTE-A x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1814769 | TR 37.716-21-21 v0.2.0 update: LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1814770 | Revised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1814771 | Introducing CR on new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1814772 | Draft CR on FR1-FR2 UE-to-UE coexistence for TS38.101-1 | LG Electronics France | imported from 3GU |
R4‑1814773 | UE type for FR2 Power Class in Rel-15 | LG Electronics | imported from 3GU |
R4‑1814774 | Draft CR on FR1-FR2 UE-to-UE coexistence for TS38.101-3 | LG Electronics France | imported from 3GU |
R4‑1814775 | Updated WF on 2 Rx vehicle UE: Link budget simulation assumptions | Samsung | imported from 3GU |
R4‑1814776 | draft CR on UE type for Power Class 2 in FR2 | LG Electronics, SK Telecom, KT, LG Uplus, Sumitomo Elec. Industries Ltd | imported from 3GU |
R4‑1814777 | MCG/SCG Abbreviations in TS36.101 in rel-15 | LG Electronics France | imported from 3GU |
R4‑1814778 | MCG/SCG Abbreviations in TS36.101 in rel-14 | LG Electronics France | imported from 3GU |
R4‑1814779 | MCG/SCG Abbreviations in TS36.101 in rel-13 | LG Electronics France | imported from 3GU |
R4‑1814780 | MCG/SCG Abbreviations in TS36.101 in rel-12 | LG Electronics France | imported from 3GU |
R4‑1814781 | MPE/SAR requirements in TS38.101-1 | LG Electronics France | imported from 3GU |
R4‑1814782 | Draft CR for RF exposure compliance in TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1814783 | MPE/SAR requirements in TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1814784 | Draft CR for RF exposure compliance in TS38.101-3 | LG Electronics France | imported from 3GU |
R4‑1814785 | TR 38.826 v0.2.0 update: 2Rx vehicle NR UE at FR1 | LG Electronics France | imported from 3GU |
R4‑1814786 | System coverage analysis based on 2RX vehicle NR UE link budget evaluation | LG Electronics France | imported from 3GU |
R4‑1814787 | Draft reply LS on NR V2X UE RF parameters | LG Electronics France | imported from 3GU |
R4‑1814788 | Remaining Issue Discussion on RRC re-establishment for SA NR | MediaTek inc. | imported from 3GU |
R4‑1814789 | CR on TS38.133 BWP switch test case(section A4.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1814790 | CR on TS38.133 BWP switch test case(section A5.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1814791 | CR on TS38.133 for Handover(section 6.1) | MediaTek inc. | imported from 3GU |
R4‑1814792 | CR on TS38.133 BWP configuration(section A.3.9) | MediaTek inc. | imported from 3GU |
R4‑1814793 | MSD test results for new x bands DL (x=3, 4, 5) with 2 bands UL CA in Rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1814794 | Revised WID on x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1814795 | Remove the brackets in Rel-14 V2V AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1814796 | Remove the brackets in Rel-14 V2V AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1814797 | Draft CR on SUL band combinations to TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1814798 | Draft CR on SUL band combinations to TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1814799 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1814800 | TP for TR 37.716-00-00: Updated specific requirements for SUL band combinations | Huawei, HiSilicon | imported from 3GU |
R4‑1814801 | Draft CR on some changes for SUL band combinations to TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1814802 | CR on MSD for EN-DC including Band 66 and n78 to TR 37.872 | Huawei, HiSilicon | imported from 3GU |
R4‑1814803 | Draft CR on editorial error for EN-DC band combinations to TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1814804 | CR on MSD for EN-DC including Band 66 and n78 to TR 37.863-01-01 | Huawei, HiSilicon | imported from 3GU |
R4‑1814805 | Spectrum utilization improvement in unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R4‑1814806 | Discussion on wideband carrier operation for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1814807 | Draft LS reply on wideband carrier operation for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1814808 | Discussion on the parameters for NR-V evaluation | Huawei, HiSilicon | imported from 3GU |
R4‑1814809 | Draft LS reply on IBE model for V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1814810 | Evaluation on coverage for 2RX vehicle UE | Huawei, HiSilicon | imported from 3GU |
R4‑1814811 | Summary and proposal on distinguish UE types | Huawei, HiSilicon | imported from 3GU |
R4‑1814812 | Introducing CR on new x bands DL(x=3,4,5) with 2 bands UL CA band combinations in TS36.101 rel-16 | LG Electronics France | imported from 3GU |
R4‑1814813 | Discussion on measurement grids for EIRP spherical coverage and TX beam peak search | LG Electronics Finland | imported from 3GU |
R4‑1814814 | Discussions on EN-DC power control | Apple Inc. | imported from 3GU |
R4‑1814815 | Further discussion on UE behaviour and network configuration without SCS restriction | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814816 | Discussion on BS In-channel requirements for the case where UE CBW differs from BS CBW | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814817 | Draft CR on FR2 PUCCH format 1 performance requirement for TS 38.104 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814818 | TP for TS38.141-2: PUCCH format 1 OTA conformance test | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814819 | Simulation results on NR PUSCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814820 | Simulation results on NR PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814821 | Simulation results on NR PRACH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814822 | TR 38.716-02-00 v0.2.0 update: NR inter-band CA/DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1814823 | Draft CR for Intra-frequency SS-RSRQ Accuracy Test Cases for EN-DC FR1 (section A.4.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1814824 | n50 A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1814825 | Draft CR for Intra-frequency SS-RSRQ Accuracy Test Cases for EN-DC FR2 (section A.5.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1814826 | NS_03 A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1814827 | Draft CR for Intra-frequency SS-RSRQ Accuracy Test Cases for SA FR1 (section A.6.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1814828 | Draft CR for Intra-frequency SS-RSRQ Accuracy Test Cases for SA FR2 (section A.7.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1814829 | Intra-band CA ACS, IBB, OBB for all BW class for NR bands | Qualcomm Incorporated | imported from 3GU |
R4‑1814830 | Discussion on Noc level and test setup for RRM test case in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1814831 | Performance Metrics for FR1 NR MIMO OTA testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814832 | Performance Metrics for FR2 NR MIMO OTA testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814833 | 2D vs 3D MPAC Probe Configuration for FR1 CDL channel models | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814834 | Extension of RTS test method from 2Rx to 4Rx and up to 7.25 GHz | Keysight Technologies UK Ltd, GTS | imported from 3GU |
R4‑1814835 | On Feasibility of MPAC Systems for FR2 | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814836 | Request for Dynamic Geometry Scenario Examples | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814837 | On EIRP Spherical Coverage Measurement Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814838 | On EIS Spherical Coverage Measurement Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814839 | On Coarse and Fine Measurement Grids for Beam Peak Searches | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814840 | DraftCR to TR38.810 to correct QoQZ Procedure Applicability | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814841 | On FR2 Temperature Testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814842 | Channel model and test system for NR MIMO OTA in FR1 | NTT DOCOMO, INC | imported from 3GU |
R4‑1814843 | Discussion on PCMAX for inter-band EN-DC within FR1 | OPPO | imported from 3GU |
R4‑1814844 | Draft CR to introduce Intra-band CA blocking requirements for all BW class | Qualcomm Incorporated | imported from 3GU |
R4‑1814845 | Environmental conditions for NR MIMO OTA in FR1 | NTT DOCOMO, INC | imported from 3GU |
R4‑1814846 | FR2 EESS A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1814847 | Draft CR to 38.101-2: On FR2 EESS A-MPR for n258 | Qualcomm Incorporated | imported from 3GU |
R4‑1814848 | CR on scaling factor in FR2 for idle state requirement | Intel Corporation | imported from 3GU |
R4‑1814849 | Reply LS on SFN offset for OTDOA | Intel Corporation | imported from 3GU |
R4‑1814850 | Draft CR to 38.101-2: On FR2 CA MPR v2 | Qualcomm Incorporated | imported from 3GU |
R4‑1814851 | n41 – B40 Coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1814852 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814853 | Corrections to CA REFSENS exception | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814854 | Corrections of REFSENS exceptions in Rel-14 CAs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814855 | Corrections of REFSENS exceptions in Rel-14 CAs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814856 | Misc corrections on Rel-15 CAs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814857 | On the open issues of beam correspondence | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814858 | On release independence of FR2 non-contiguous UL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814859 | Configuration of channel BW in RRC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814860 | Carrier bandwidth configurations and RF requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814861 | [draft] Further Reply LS on RAN4 design on channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814862 | FR2 UE RF exposure compliance and its system implications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814863 | Switching time between LTE UL and NR UL based on PA architecture | Apple Inc. | imported from 3GU |
R4‑1814864 | Remaining issues on RLM | MediaTek inc. | imported from 3GU |
R4‑1814865 | CR on RMC for RLM (section A.3.8) | MediaTek inc. | imported from 3GU |
R4‑1814866 | CR for RLM (Section 8.1.1, 8.1.2.2, 8.1.3.1, and 8.1.3.2) | MediaTek inc. | imported from 3GU |
R4‑1814867 | Remaining issues on RLM test cases | MediaTek inc. | imported from 3GU |
R4‑1814868 | CR on TS38.133 for EN-DC FR1 SSB based RLM (section A.4.5.1.1, A.4.5.1.2, A.4.5.1.3, A.4.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1814869 | CR on TS38.133 for EN-DC FR2 SSB based RLM (section A.5.5.1.1, A.5.5.1.2, A.5.5.1.3, A.5.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1814870 | CR on TS38.133 for SA FR1 SSB based RLM (section A.6.5.1.1, A.6.5.1.2, A.6.5.1.3, A.6.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1814871 | CR on TS38.133 for SA FR2 SSB based RLM (section A.7.5.1.1, A.7.5.1.2, A.7.5.1.3, A.7.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1814872 | Summary of PDCCH simulation results for RLM | MediaTek inc. | imported from 3GU |
R4‑1814873 | Discussion on requirements for beam failure detection | MediaTek inc. | imported from 3GU |
R4‑1814874 | CR for condition for non-Rx beam sweeping in BFD requirements (section 8.5.2.2 and 8.5.3.2) | MediaTek inc. | imported from 3GU |
R4‑1814875 | Discussion on requirements for candidate beam detection | MediaTek inc. | imported from 3GU |
R4‑1814876 | Discussion on requirements for L1-RSRP measurement for reporting in FR2 | MediaTek inc. | imported from 3GU |
R4‑1814877 | Discussion on SCell activation delay requirement | MediaTek inc. | imported from 3GU |
R4‑1814878 | Switching time between LTE UL and NR UL based on PA architecture | Apple Inc. | imported from 3GU |
R4‑1814879 | Draft CR to 38.101-1. Introduce RB restriction for n41 – B40 Coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1814880 | EN-DC Interband RX Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1814881 | Discussion on PCMAX for inter-band EN-DC within FR1 | OPPO | imported from 3GU |
R4‑1814882 | Draft CR on Pcmax for inter band EN-DC within FR1 | OPPO | imported from 3GU |
R4‑1814883 | Draft CR on Pcmax for intra-band EN-DC | OPPO | imported from 3GU |
R4‑1814884 | Draft CR on Power Class for inter band EN-DC within FR1 | OPPO | imported from 3GU |
R4‑1814885 | Discussion on output power dynamic for intra-band EN-DC | OPPO | imported from 3GU |
R4‑1814886 | Draft CR on output power dynamic for DC | OPPO | imported from 3GU |
R4‑1814887 | Draft CR on A-MPR for inter band EN-DC within FR1 | OPPO | imported from 3GU |
R4‑1814888 | FR2 OTA transmit ON/OFF power test system concerns | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814889 | TP for TR 37.716-11-11: UE requirements for DC_3-3_n77, DC_3-3_n78 | CHTTL | imported from 3GU |
R4‑1814890 | Concerns about measuring FR2 out-of-band unwanted emission (OBUE) performance and suggested measurement options | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1814891 | Temperature condition for EIRP verification | MediaTek Inc. | imported from 3GU |
R4‑1814892 | EN_DC Intra-band RX Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1814893 | Selection of FR2 SCC for Neighboring Cell Search | MediaTek inc. | imported from 3GU |
R4‑1814894 | UE Behavior Before and After Measurement Gap | MediaTek inc. | imported from 3GU |
R4‑1814895 | On the autonomous gap for inter-RAT RSTD | MediaTek inc. | imported from 3GU |
R4‑1814896 | Remaining issues on SFTD | MediaTek inc. | imported from 3GU |
R4‑1814897 | Corrections on SFTD (section 7.35.2 and 8.1.2.4.26.1) | MediaTek inc. | imported from 3GU |
R4‑1814898 | CR on introducing requirement of max allowed transition times for TDD Intra-band CA (Section 7.8) | MediaTek inc. | imported from 3GU |
R4‑1814899 | Impact of FR2 intra-band NCCA MRTD to UE Rx beam switch | MediaTek inc. | imported from 3GU |
R4‑1814900 | Remaining issue on BWP switch delay | MediaTek inc. | imported from 3GU |
R4‑1814901 | Remaining issue on BWP switch interruption | MediaTek inc. | imported from 3GU |
R4‑1814902 | CR on TS36.133 for interruption due to BWP switch | MediaTek inc. | imported from 3GU |
R4‑1814903 | CR on TS38.133 for interruption due to BWP switch (section 8.2.1.2.7 and 8.2.2.2.5) | MediaTek inc. | imported from 3GU |
R4‑1814904 | CR on Clarification in RMSI RMC (Section A.3.1.2) | MediaTek inc., Ericsson | imported from 3GU |
R4‑1814905 | Out of band blocking for Band 42 | Qualcomm Incorporated | imported from 3GU |
R4‑1814906 | TR 37.716-00-00 V0.2.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1814907 | DL measurement signal for FR2 UE beam correspondence verification | MediaTek Inc. | imported from 3GU |
R4‑1814908 | CR to TS37.141 on NR test model | ZTE Corporation | imported from 3GU |
R4‑1814909 | TP for TR 37.716-21-11 UE requirements for DC_7-8_n77, DC_7-8_n78 | CHTTL | imported from 3GU |
R4‑1814910 | FR2 UE EIS verifications and beam correspondence | MediaTek Inc. | imported from 3GU |
R4‑1814911 | New WI proposal: LTE/NR spectrum sharing of band 41 | KDDI Corporation | imported from 3GU |
R4‑1814912 | TP for TR 37.716-21-11: DC_18-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1814913 | CR to TS 36.101 – revision of OOB for B42 | Qualcomm Incorporated | imported from 3GU |
R4‑1814914 | TP for TR 37.716-21-11: DC_3-41_n79 | KDDI Corporation | imported from 3GU |
R4‑1814915 | CR to TS 36.101 – Add RF requirements for CA 66C | Qualcomm Incorporated | imported from 3GU |
R4‑1814916 | CR to TR 36.715 – To correct AMPR for CA_NS_09 | Qualcomm Incorporated | imported from 3GU |
R4‑1814917 | TP for TR 37.716-21-11: DC_3-41_n77 | KDDI Corporation | imported from 3GU |
R4‑1814918 | TP for TR 37.716-21-11: DC_3-18_n78 | KDDI Corporation | imported from 3GU |
R4‑1814919 | TP for TR 37.716-21-11: DC_3-18_n77 | KDDI Corporation | imported from 3GU |
R4‑1814920 | TP for TR 37.716-31-11: DC_3-18-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1814921 | Draft CR to 38.104 on channel spacing for intra-band CA | ZTE Corporation | imported from 3GU |
R4‑1814922 | Views on HST tests | NTT DOCOMO, INC. | imported from 3GU |
R4‑1814923 | Simulation results for PDSCH demodulation tests with follow PMI | NTT DOCOMO, INC. | imported from 3GU |
R4‑1814924 | Simulation results for SDR test | NTT DOCOMO, INC. | imported from 3GU |
R4‑1814925 | Draft CR to 38.101-1 on intra-band contiguous CA configurations for FR1 | ZTE Corporation | imported from 3GU |
R4‑1814926 | TP for TR 37.716-31-11: DC_3-18-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1814927 | TP for TR 38.716-01-01 for CA_2DL_n41C_1UL_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1814928 | TP for TR 38.716-01-01 for CA_2DL_n41(2A)_1UL_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1814929 | TP for TR 38.716-01-01 for CA_2DL_n41(2A)_2UL_n41(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1814930 | TP for TR 36.716-03-02: LTE inter-band CA 3 bands DL with 2 bands UL | Verizon, LG Electronics Finland | imported from 3GU |
R4‑1814931 | TP for TR 37.716-31-11: DC_1-18-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1814932 | TP for TR 36.716-03-02: LTE inter-band CA 4 bands DL with 2 bands UL | Verizon, LG Electronics Finland | imported from 3GU |
R4‑1814933 | Preliminary MPR Measurements for DC_3_n3 for 1 and 2 UL antenna architecture | Skyworks Solutions Inc. | imported from 3GU |
R4‑1814934 | TP for TR 37.716-31-11: DC_1-18-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1814935 | Draft CR to 38.101-2 on UE maximum output power with additional requirements | ZTE Corporation | imported from 3GU |
R4‑1814936 | MSD for DC_3_n3 One and Two UL Antenna Architectures | Skyworks Solutions Inc. | imported from 3GU |
R4‑1814937 | TP to TR 37.716-21-21: finalize UE requirements for DC_3_n1-n77 | CHTTL | imported from 3GU |
R4‑1814938 | Draft CR to 38.101-3 on operating bands for CA and DC | ZTE Corporation | imported from 3GU |
R4‑1814939 | TP for TR 37.716-41-11: DC_1-3-41-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1814940 | TP to TR 37.716-21-21: finalize UE requirements for DC_3_n1-n77 | CHTTL | imported from 3GU |
R4‑1814941 | Draft CR to 38.101-3 rel16 to introduce MSD for DC_(n)71AA and BCS1 | Skyworks Solutions Inc., T-Mobile USA | imported from 3GU |
R4‑1814942 | TP to TR 37.716-21-21: UE requirements for DC_3_n1-n78 | CHTTL | imported from 3GU |
R4‑1814943 | TP for TR 37.716-41-11: DC_1-3-41-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1814944 | CR to 37.865-01-01: Corrections on configurations for intra-band CA | ZTE Corporation | imported from 3GU |
R4‑1814945 | TP for TR 37.716-41-11: DC_1-3-18-42_n79 | KDDI Corporation | imported from 3GU |
R4‑1814946 | Test setup for FR2 RRM Tests | Qualcomm Incorporated, Vodafone, AT&T, Verizon, KT, T-Mobile USA, NTT Docomo, KDDI | imported from 3GU |
R4‑1814947 | Wide Beams and Narrow Beams in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1814948 | AoA Setup for FR2 RRM Testing | Qualcomm Incorporated | imported from 3GU |
R4‑1814949 | FR2 RRM Side Conditions | Qualcomm Incorporated | imported from 3GU |
R4‑1814950 | FR2 RRM Side Conditions | Qualcomm Incorporated | imported from 3GU |
R4‑1814951 | TP for TR 37.716-41-11: DC_1-3-18-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1814952 | SRS switch IL simulation in FR1 | OPPO | imported from 3GU |
R4‑1814953 | Draft CR on introduction of SRS switch IL in FR1 | OPPO | imported from 3GU |
R4‑1814954 | Discussion on intra-band EN-DC HPUE in FR1 | OPPO | imported from 3GU |
R4‑1814955 | Introduction of maxUplinkDutyCycle to ENDC HPUE in FR1 | OPPO | imported from 3GU |
R4‑1814956 | Draft LS on UE capability of maxUplinkDutyCycle for intra-band EN-DC power class 2 in FR1 | OPPO | imported from 3GU |
R4‑1814957 | Discussion on UE RF exposure compliance in FR2 | OPPO | imported from 3GU |
R4‑1814958 | Draft CR on introduction of maxUplinkDutyCycle in FR2 | OPPO | imported from 3GU |
R4‑1814959 | Changes to Max input power UL and DL configuratgions in FR1 | OPPO | imported from 3GU |
R4‑1814960 | Discussion on UE RF requirement verification with extreme conditions in FR2 | OPPO | imported from 3GU |
R4‑1814961 | Discussion on form factor desense in FR2 | OPPO | imported from 3GU |
R4‑1814962 | TP on figure of merit in FR1 and FR2 static MIMO OTA | OPPO | imported from 3GU |
R4‑1814963 | Discussion on environmental conditions in FR1 MIMO OTA | OPPO | imported from 3GU |
R4‑1814964 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1814965 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1814966 | TR 37.716-41-11 V0.1.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814967 | Updated scope of TR 37.716-41-11 V0.1.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814968 | Revised WID on Dual Connectivity (EN-DC) of 4 bands LTE inter-band CA (4DL/1UL) and 1 NR band (1DL/1UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814969 | Introduction of EN-DC 4 LTE bands + 1 NR band into TS 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814970 | NR FR1 relative power tolerance CR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814971 | CR to introduce new features into 38.307 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814972 | A-MPR for NS_03 and NS_03U and re-formulation of NS_100 | Nokia | imported from 3GU |
R4‑1814973 | On DC_(n)71AA new A-MPR approach and intraband contiguous EN-DC Pcmax | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814974 | CR to 38.101-3: Pcmax for intra-band contiguous EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814975 | Correction for Intra-band contiguous EN-DC A-MPR definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814976 | Correction for Maximum output power for inter-band EN-DC (two bands) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814977 | Correction for ?TIB,c for EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814978 | MPR and A-MPR for interband EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814979 | Simplification of EN-DC and CA between FR1 and FR2 UE to UE co-ex table by adopting CA band approach | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814980 | Correction for intra-band EN-DC bandwidth class | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814981 | WI proposal for LTE 410 MHz | Nokia | imported from 3GU |
R4‑1814982 | Introduction of band 53 into TS 25.101 | Nokia | imported from 3GU |
R4‑1814983 | Introduction of band 53 into TS 36.124 | Nokia | imported from 3GU |
R4‑1814984 | Corrections to feMTC RRM test cases A.7.2.6 and A.7.2.7 (Rel-13) | Rohde & Schwarz | imported from 3GU |
R4‑1814985 | Corrections to feMTC RRM test cases A.7.2.6 and A.7.2.7 (Rel-14) | Rohde & Schwarz | imported from 3GU |
R4‑1814986 | Corrections to feMTC RRM test cases A.7.2.6 and A.7.2.7 (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1814987 | Corrections to feMTC RRM test case A.8.1.28 (Rel-13) | Rohde & Schwarz | imported from 3GU |
R4‑1814988 | Corrections to feMTC RRM test case A.8.1.28 (Rel-14) | Rohde & Schwarz | imported from 3GU |
R4‑1814989 | Corrections to feMTC RRM test case A.8.1.28 (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1814990 | Corrections to NB-IOT RSTD reporting delay requirements and tests (Rel-14) | Rohde & Schwarz | imported from 3GU |
R4‑1814991 | Corrections to NB-IOT RSTD reporting delay requirements and tests (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1814992 | Corrections to generic CA RRM test cases up to 5 DL CCs (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1814993 | Corrections to generic CA RRM test cases for 6 and 7 DL CCs (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1814994 | draft CR for introduce DC of LTE 4band + NR 1band for TS 38.101-3 | KDDI Corporation | imported from 3GU |
R4‑1814995 | draft CR for introduce DC of LTE 3band + NR 1band for TS 38.101-3 | KDDI Corporation | imported from 3GU |
R4‑1814996 | draft CR for introduce DC of LTE 2band + NR 1band for TS 38.101-3 | KDDI Corporation | imported from 3GU |
R4‑1814997 | draft CR for introduce DC of LTE 1band + NR 1band for TS 38.101-3 | KDDI Corporation | imported from 3GU |
R4‑1814998 | Finalizing SUL specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1814999 | draft CR to 38.101-1: SUL clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815000 | draft CR to 38.101-3: SUL clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815001 | Draft Response LS on UE capability for SUL and SDL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815002 | UE capabilities for pairing of SDL and SUL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815003 | EIRP accuracy in extreme conditions for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815004 | Measurement procedures and interpretation of measurement results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815005 | TP to 38.141-2: MU clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815006 | CR to 37.145-2: MU clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815007 | CR to 38.104: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815008 | TP to 38.141-2: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815009 | CR to 37.105: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815010 | CR to 37.145-2: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815011 | TP to TS 38.141-1: test model and data content (Section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1815012 | Intra-frequency measurement requirements in DRX mode for EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815013 | Inter-frequency measurement requirements in DRX mode for EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815014 | Applicability rule on measurement requirements in DRX mode for EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815015 | The necessity of MTTD requirement for intra-band synchronous EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815016 | Remaining issues on Radio Link Monitoring | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815017 | CR on TS38.133 for UE scheduling availability of UE performing radio link monitoring on FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815018 | Remaining issues on Candidate beam detection | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815019 | Remaining issues on L1-RSRP Computation for reporting | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815020 | Measurement condition for EIS in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815021 | Beam correspondence requirement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815022 | Draft CR to 38.133 on UE behaviour before and after measurement gap (section 9.1.2) | ZTE | imported from 3GU |
R4‑1815023 | Draft CR to 38.133 on correction of measurement gap and interruption time (section 9.1.2) | ZTE | imported from 3GU |
R4‑1815024 | Further discussion on UE behaviour before and after measurement gap | ZTE | imported from 3GU |
R4‑1815025 | Draft CR to 38.133 on CSI-RS based RLM requirements (section 8.1.3) | ZTE | imported from 3GU |
R4‑1815026 | Discussion on remaining issues on CSI-RS based RLM | ZTE | imported from 3GU |
R4‑1815027 | Draft CR to 38.133 on NR FR1 inter-RAT handover test cases (section A.6.3.1) | ZTE | imported from 3GU |
R4‑1815028 | Discussion on inter frequency measurement accuracy and side conditions | ZTE | imported from 3GU |
R4‑1815029 | Draft CR to TS38.101-1: Corrections on TS for MSD calculations based on ENDC bands combination including of bands n1,n3,n8, n77, and n78 | MediaTek Inc. | imported from 3GU |
R4‑1815030 | NR BS test model 3.2 and 3.3 for FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815031 | NR BS FR2 TDD transmitter OFF power and transient period | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815032 | TP to TS 38.141-2 Update on test procedure of NR BS OTA transmit ON/OFF power | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815033 | TP to TS 38.141-1 Correction on conducted EVM test procedure for NR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815034 | TP to TS 38.141-2 Correction on OTA EVM test procedure for NR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815035 | TP to TS 38.141-2: Correction on scaling for NR BS OBUE limits | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815036 | Clarification on fractional bandwidth definition for NR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815037 | Draft CR for TS 38.104: Correction on fractional bandwidth for NR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815038 | TP to TS 38.141-2 Correction on fractional bandwidth for NR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815039 | TP to TS 38.141-2 Correction on declaration | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815040 | Directivity for calculation of TRP | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815041 | Draft CR to TS38.101-3: Corrections on TS for MSD calculations based on ENDC bands combination including of bands 1,3,8, n77, and n78 | MediaTek Inc. | imported from 3GU |
R4‑1815042 | TP for TR 38.716-02-00: MSD for CA_n1A-n77A due to the 2nd harmonic | MediaTek Inc. | imported from 3GU |
R4‑1815043 | MSD analysis for DC band combination of Band 20, 38 and n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1815044 | MSD analysis for DC band combination of Band 8, 20 and n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1815045 | MPR/A-MPR consideration for intra-band DC_(n)41 | Huawei, HiSilicon | imported from 3GU |
R4‑1815046 | TDD configuration for UE demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815047 | Remaining issues on PDSCH demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815048 | On inter band EN-DC configured power | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815049 | Remaining issues on RAN4 UE feature list | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815050 | Remaining issues on SDR requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815051 | draft CR for OBB for Inter band EN-DC for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815052 | OBB for inter band EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815053 | draft CR for finalizing ACS in FR1 for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815054 | Interpretation of ACS requirement for Class C NR CA in FR1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815055 | Extreme condition requirement for FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815056 | Handling UE types in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815057 | Draft CR for Introducing missing requirement for power class 4 in FR2 for TS 38.101-2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815058 | draft CR for removing UE types in FR2 for TS 38.101-2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815059 | Draft CR for correction for missing agreed DC combinations in Rel-15 for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815060 | draft CR for adding note about the fallback of NR CA in FR1 for TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815061 | draft CR for adding note about the fallback of EN-DC in Applicability of minimum requirements for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815062 | introducing P-max to Pcmax in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815063 | draft CR for introducing P-max to Pcmax in FR2 for TS 38.101-2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815064 | RF exposure compliance for FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815065 | draft CR for adding missing transmit singnal quality for inter band EN-DC for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815066 | TP for TR 37.716-01-01 CA_n257_UL_n257 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815067 | Updated TR 37.716-11-11_V0.2.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815068 | revised WID on EN-DC of 1 LTE band and 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815069 | Draft CR to reflect agreed EN-DC of 1 LTE band and 1 NR band in TR 37.716-11-11 for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815070 | Draft CR for EN-DC of 1 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815071 | Draft CR for EN-DC of 1 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815072 | Draft CR for EN-DC of 2 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815073 | Draft CR for EN-DC of 2 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815074 | Draft CR for EN-DC of 3 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815075 | Draft CR for EN-DC of 3 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815076 | Draft CR for EN-DC of 4 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815077 | TP for TR 37.716-41-11 EN-DC 3-19-21-42_n77 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815078 | TP for TR 37.716-41-11 EN-DC 3-19-21-42_n78 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815079 | TP for TR 37.716-41-11 EN-DC 3-19-21-42_n79 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815080 | Draft CR for EN-DC of 4 band LTE and1 band NR for TS 38.101-3 with FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1815081 | TP on evaluation on coverage for 2RX vehicle UE | Huawei, HiSilicon | imported from 3GU |
R4‑1815082 | TP on methods to distinguish UE types | Huawei, HiSilicon | imported from 3GU |
R4‑1815083 | CR for L1 indication interval for RLM and BFD (section 8.1.6, 8.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815084 | CR for measurement capability (section 9.2.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815085 | Discussion on the remaining issues of UE measurement capability | Huawei, HiSilicon | imported from 3GU |
R4‑1815086 | Draft LS on UE measurement capability | Huawei, HiSilicon | imported from 3GU |
R4‑1815087 | CR for MO merging in 36.133 (section 8.1.2.1.1b.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815088 | CR for MO merging in 38.133 (section 9.1.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815089 | CR for scheduling availability in 38.133 (section 8.1.7.2, 8.1.7.3, 8.5.7.3, 9.2.5.3.2 and 9.2.5.3.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1815090 | Discussion on Rx beam selection for RRM measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1815091 | Discussion on the impact of dual SMTCs on intra-frequency carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1815092 | CR for measurement report mapping table (section 10.1.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1815093 | Maintenance CR for PHR mapping tables R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815094 | Introducing TDD NPRACH configuration for NB test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1815095 | TDD contention based random access test case under normal coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815096 | TDD contention based random access test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815097 | TDD contention based random access test case on non-anchor carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1815098 | TDD intra-frequency RSTD measurement accuracy test case under normal coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815099 | TDD inter-frequency RSTD measurement accuracy test case under normal coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815100 | TDD intra-frequency RSTD measurement accuracy test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815101 | TDD inter-frequency RSTD measurement accuracy test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815102 | TDD idle intra-frequency RSTD measurement test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815103 | TDD idle inter-frequency RSTD measurement test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1815104 | CR on TDD support in conditions for NB-IoT measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1815105 | CR on TDD support in measurement accuracy requirements for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1815106 | CR on NRSRP accuracy applicability for UE Category NB1 R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1815107 | CR on NRSRP accuracy applicability for UE Category NB1 and NB2 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815108 | CR on NRSRP accuracy applicability for UE Category NB1 and NB2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815109 | CR on NB idle state RSTD measurement requirements R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815110 | CR on NB idle state RSTD measurement requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815111 | CR on NB RSTD test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815112 | CR on NB RSTD test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815113 | CR on NPRACH configurations for NB R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815114 | CR on NB random access test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1815115 | CR on NB random access test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815116 | CR on NB random access test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815117 | CR on the remaining issues about WU and CD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815118 | Introducing principle for LTE UE connected to 5GC test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1815119 | Discussion on the remaining issues on the MO merging | Huawei, HiSilicon | imported from 3GU |
R4‑1815120 | Discussion on the redirection to NR requirements without target cell timing | Huawei, HiSilicon | imported from 3GU |
R4‑1815121 | draftCR on the release with redirection to NR (section 6.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1815122 | draftCR on re-establishement requirements for XdB value (section 6.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815123 | Discussion on the delay requirements for BWP switch | Huawei, HiSilicon | imported from 3GU |
R4‑1815124 | Discussion on the requirements for BWP switch interruptions on other serving CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1815125 | draftCR on BWP switching delay (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1815126 | draftCR on BWP switching interruptions on NR (section 8.2.1 and 8.2.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815127 | CR on BWP switching interruptions on LTE Pcell in EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1815128 | Maintenance CR for intra cell search test cases EN-DC FR1 (section A.4.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815129 | Maintenance CR for intra cell search test cases EN-DC FR2 (section A.5.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815130 | Maintenance CR for intra cell search test cases SA FR1 (section A.6.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815131 | Maintenance CR for intra cell search test cases SA FR2 (section A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815132 | Section A.3 maintenance CR (section A.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1815133 | Idle mode cell reselection test cases list | Huawei, HiSilicon | imported from 3GU |
R4‑1815134 | Inactive state test cases principle CR | Huawei, HiSilicon | imported from 3GU |
R4‑1815135 | Cell reselection to intra-frequency NR test cases for FR1 (section A.6.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815136 | Cell reselection to FR1 inter-frequency NR test cases for FR1 (section A.6.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815137 | Cell reselection to higher priority E-UTRAN test cases (section A.6.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815138 | Cell reselection to lower priority E-UTRAN test cases (section A.6.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815139 | Cell reselection to intra-frequency NR test cases for FR2 (section A.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815140 | Cell reselection to FR2 inter-frequency NR test cases for FR2 (section A.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815141 | Applicability for SSB Rx beam in intra-band FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1815142 | Clarfication on measurement objects in gap sharing | Huawei, HiSilicon | imported from 3GU |
R4‑1815143 | Gap sharing mehtod for TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815144 | Measurement requirements during BWP switching | Huawei, HiSilicon | imported from 3GU |
R4‑1815145 | CR on measurement requirements at transitions | Huawei, HiSilicon | imported from 3GU |
R4‑1815146 | CSSF for PRS periodicy=160ms in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815147 | Correction on inter-RAT measurement in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815148 | Discussion on applicable DRX cycle in EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1815149 | DraftCR on applicable DRX cycle in EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1815150 | Discussion on the cell reselection measurement requirements in idle mode | Huawei, HiSilicon | imported from 3GU |
R4‑1815151 | CR on cell reselection requirements in idle mode in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815152 | Discussion on Trs definition | Huawei, HiSilicon | imported from 3GU |
R4‑1815153 | Correction on Trs in handover requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815154 | CR on PSCell addition delay in TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815155 | Applicability for single CC BWP switching delay tests | Huawei, HiSilicon | imported from 3GU |
R4‑1815156 | Maintenance CR for SUL test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1815157 | Test case for EN-DC UE UL carrier RRC reconfiguration Delay (section A.4.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815158 | Test case for NR standalone UE UL carrier RRC reconfiguration Delay (section A.6.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815159 | Discussion on LS on the interruption time during mobility in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1815160 | Reply LS on the interruption time during mobility in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1815161 | Defining MG starting point in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815162 | UE UL transmission after MG (section 9.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815163 | Further discussion on UE behavior around MG | Huawei, HiSilicon | imported from 3GU |
R4‑1815164 | Introducing dual SMTC in measurement requriements (section 9.1.5, 9.2.5, 9.2.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1815165 | Clarification of intra-frequency cell/SSB identification requirements (section 9.2.5.1, 9.2.6.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1815166 | On identification delay for new SSB of an already detected cell | Huawei, HiSilicon | imported from 3GU |
R4‑1815167 | Clarification of inter-frequency cell/SSB identification requirements (section 9.3.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815168 | Discussion on remaining issues for inter-RAT RSTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1815169 | Update to inter-RAT RSTD measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815170 | Further discussion on RLM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815171 | CR to RLM requriements (section 8.1.1-3) | Huawei, HiSilicon | imported from 3GU |
R4‑1815172 | CR to RLM scheduling restriction (section 8.1.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1815173 | CR for remaining issues in SCell activation and deactivation (section 8.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1815174 | Further discussion on BFD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815175 | CR to BFD requriements (section 8.5.2, 8.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1815176 | CR to BFD scheduling restriction (section 8.5.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1815177 | On requirements for L1-RSRP measurement for beam reporting | Huawei, HiSilicon | imported from 3GU |
R4‑1815178 | CR for L1-RSRP measurement accuracy (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815179 | CR for L1-RSRP measurement accuracy (section 8.7 9.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1815180 | CR to L1-RSRP scheduling restriction (section 9.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1815181 | [draft] LS on maximum periodicity for L1-RSRP reporting | Huawei, HiSilicon | imported from 3GU |
R4‑1815182 | Further discussion on FR2 RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1815183 | Way forward on FR2 RRM test | Huawei, HiSilicon | imported from 3GU |
R4‑1815184 | Introduction of AoA configuration for FR2 RRM tests (section A.3.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1815185 | Maintenace of TC for EN-DC FR1 inter-f RSRP accuracy (section A.4.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815186 | Maintenace of TC for EN-DC FR2 inter-f RSRP accuracy (section A.5.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815187 | Maintenace of TC for SA FR1 inter-f RSRP accuracy (section A.6.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815188 | Maintenace of TC for SA FR2 inter-f RSRP accuracy (section A.7.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1815189 | Discussion on test case design for L1-RSRP reporting | Huawei, HiSilicon | imported from 3GU |
R4‑1815190 | CR for adding CSI-RS configuration for L1-RSRP tests (A.3.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815191 | CR for adding SSB configuration for L1-RSRP tests (A.3.1.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1815192 | TC for EN-DC CSI-RS based L1-RSRP measurement for FR1 (section A.4.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815193 | TC for EN-DC SSB based L1-RSRP measurement for FR1 (section A.4.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815194 | TC for EN-DC CSI-RS based L1-RSRP measurement for FR2 (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815195 | TC for EN-DC SSB based L1-RSRP measurement for FR2 (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815196 | TC for SA CSI-RS based L1-RSRP measurement for FR1 (section A.6.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815197 | TC for SA SSB based L1-RSRP measurement for FR1 (section A.6.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815198 | TC for SA CSI-RS based L1-RSRP measurement for FR2 (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815199 | TC for SA SSB based L1-RSRP measurement for FR2 (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1815200 | Synchrnoization for NR TM Design | Ericsson | imported from 3GU |
R4‑1815201 | TP to TS 38.141-1: Section 4.9.2 2 NR FR1 Test Models | Ericsson | imported from 3GU |
R4‑1815202 | TP to TS 38.141-2: Section 4.9.2 2 NR FR2 Test Models | Ericsson | imported from 3GU |
R4‑1815203 | TP to TS 38.141-1: Editorial corrections to align naming | Ericsson | imported from 3GU |
R4‑1815204 | TP to TS 38.141-2: Editorial corrections to align naming | Ericsson | imported from 3GU |
R4‑1815205 | TP to TS 38.141-1: Section 4.9.2.3 Data content for PHY channels | Ericsson | imported from 3GU |
R4‑1815206 | TP to TS 38.141-2: Section 4.9.2.3 Data content for PHY channels | Ericsson | imported from 3GU |
R4‑1815207 | Correction to interband EN-DC OOBE emission requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815208 | on UL PRB to DL PRB center offset for TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1815209 | Peak Current Consumption and MPR for NB-IoT Power Class 6 | Huawei, HiSilicon | imported from 3GU |
R4‑1815210 | TR 37.716-21-11 v0.2.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1815211 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1815212 | Introduction of completed EN-DC of 2 bands LTE and 1 band NR into Rel-16 TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1815213 | Discussion on new UE RF architecture capability for intra-band EN-DC and intra-band NR UL CA | CHTTL | imported from 3GU |
R4‑1815214 | draft LS on new UE capability for intra-band EN-DC and intra-band NR UL CA | CHTTL | imported from 3GU |
R4‑1815215 | TP to TR38.819: Background | Dish Network, HNS | imported from 3GU |
R4‑1815216 | TP to TR38.819: Adjacents bands | Dish Network, HNS | imported from 3GU |
R4‑1815217 | TP to TR38.819: List of band specific issues | Dish Network, HNS | imported from 3GU |
R4‑1815218 | CA_n70A-n71A requirements | Dish Network | imported from 3GU |
R4‑1815219 | TP to TR38.819: UE aspect issues | Dish Network, HNS | imported from 3GU |
R4‑1815220 | Summary of simulation results for sTTI UE demodulation requirements | Ericsson | imported from 3GU |
R4‑1815221 | Introduction of Slot/Subslot-PDSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815222 | Open issues for SPDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815223 | Introduction of SPDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815224 | sTTI CQI reporting tests | Ericsson | imported from 3GU |
R4‑1815225 | Introduction of CQI tests for sTTI | Ericsson | imported from 3GU |
R4‑1815226 | Introduction of SPUCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815227 | Simulation results of UE demodulation requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1815228 | Open issues for eFeMTC UE demodulation requirements | Ericsson | imported from 3GU |
R4‑1815229 | Introduction of UE demodulation requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1815230 | CQI requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1815231 | Introduction of CQI reporting requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1815232 | Summary of simulation results for eFeMTC BS demodulation requirements | Ericsson | imported from 3GU |
R4‑1815233 | Simulation result of BS demodulation requirements for eFeMTC | Ericsson, Sierra Wireless | imported from 3GU |
R4‑1815234 | Introduction of BS demodulation requirements for eFeMTC (TS36.104) | Ericsson | imported from 3GU |
R4‑1815235 | Introduction of BS demodulation requirements for eFeMTC (TS36.141) | Ericsson | imported from 3GU |
R4‑1815236 | Test case for MSG3-based channel quality report | Ericsson | imported from 3GU |
R4‑1815237 | Introduction of MSG3-based channel quality reporting test | Ericsson | imported from 3GU |
R4‑1815238 | Introduction of MSG3-based channel quality reporting test | Ericsson | imported from 3GU |
R4‑1815239 | Simulation results of PDSCH demodulation for 1024QAM | Ericsson | imported from 3GU |
R4‑1815240 | Simulation results of NR PBCH demodulation | Ericsson | imported from 3GU |
R4‑1815241 | TP to TS 38.101-4: 5.4 FR1 PBCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815242 | TP to TS 38.101-4: 7.4 FR1 PBCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815243 | TDD configuration for UE RF Tx requirements RMC | Ericsson | imported from 3GU |
R4‑1815244 | TDD configuration for UE Tx test in FR1 | Ericsson | imported from 3GU |
R4‑1815245 | TDD configuration for UE Tx test in FR2 | Ericsson | imported from 3GU |
R4‑1815246 | LTE TDD configuration for UE Tx test in EN-DC | Ericsson | imported from 3GU |
R4‑1815247 | Measurement BW for CSI-RS based candidate beam detection | Ericsson | imported from 3GU |
R4‑1815248 | TDD configuration for RRM performance requirements | Ericsson | imported from 3GU |
R4‑1815249 | Introduction of TDD configuration for EN-DC RRM tests | Ericsson | imported from 3GU |
R4‑1815250 | TP to TR38.819: MSR specific issues | Dish Network, HNS | imported from 3GU |
R4‑1815251 | TP for TR38.716-02-00: Requirements for CA_n70A-n71A | Dish Network | imported from 3GU |
R4‑1815252 | TP to TR38.819: Channel numbering | Dish Network, HNS | imported from 3GU |
R4‑1815253 | n65 MPR/A-MPR addition to 38.101-1 | Dish Network | imported from 3GU |
R4‑1815254 | Intra-band CA UE RX requirements for <2700MHz | Dish Network | imported from 3GU |
R4‑1815255 | Draft CR to 37.141: Introduction of Band n65 | Dish Network, HNS | imported from 3GU |
R4‑1815256 | WP update for n65 WI | Dish Network, HNS | imported from 3GU |
R4‑1815257 | MPR for efeMTC Power class 5 sub-PRB transmission | Sony | imported from 3GU |
R4‑1815258 | Power class 5 UE Cat-M1 and Cat-M2 MPR specification | Sony | imported from 3GU |
R4‑1815259 | NR OTA performance test AWGN level settings description | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1815260 | TP for TR 37.716-21-11: DC_2-7_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1815261 | TP for TR 37.716-21-11: DC_2-66_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1815262 | TP for TR 37.716-11-11: DC_5_n71 | Huawei, HiSilicon | imported from 3GU |
R4‑1815263 | TP for TR 37.716-11-11: DC_12_n71 | Huawei, HiSilicon | imported from 3GU |
R4‑1815264 | TP for TR 37.716-11-11: DC_8_n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1815265 | CR MPR for NB-IoT PC6 rel-14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815266 | CR MPR for NB-IoT PC6 Rel-15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815267 | Receiver requirements for interband EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815268 | TP to TS 38.141-2 on General radiated receiver characteristics | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815269 | TP to TS 38.141-2 on OTA demodulation branches | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815270 | Views on NR PDSCH demodulation performance requirement | MediaTek inc. | imported from 3GU |
R4‑1815271 | NR PDSCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1815272 | NR PDCCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1815273 | NR PBCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1815274 | NR CSI simulation result | MediaTek inc. | imported from 3GU |
R4‑1815275 | Discussion PCMAX for intra-band EN-DC | MediaTek Inc. | imported from 3GU |
R4‑1815276 | TS 38.141-1 v1.1.0 | Huawei | imported from 3GU |
R4‑1815277 | TS 38.141-2 v1.1.0 | Huawei | imported from 3GU |
R4‑1815278 | Discussion on annexes alignment among NR BS specifications | Huawei, HiSilicon | imported from 3GU |
R4‑1815279 | TP to TS 38.141-1: Remaining annexes | Huawei, HiSilicon | imported from 3GU |
R4‑1815280 | Further consideration on category B spurious emission | Huawei, HiSilicon | imported from 3GU |
R4‑1815281 | TP to TS 38.141-1: On Applicability of test configurations | Huawei | imported from 3GU |
R4‑1815282 | TP to TS 38.141-1: Cleanup | Huawei | imported from 3GU |
R4‑1815283 | TP to TS 38.141-2: Correction on OBUE requirements for MR and LA BS | Huawei | imported from 3GU |
R4‑1815284 | TP to TS 38.141-1: Corrections on additional spurious emissions requirements | Huawei | imported from 3GU |
R4‑1815285 | Corrections for test models and data content for FR1 and FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815286 | TP to TS 38.141-1: 4.9.2.3 Data content of Physical channels and Signals for NR-FR1-TM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815287 | TP to TS 38.141-2: 4.9.2.3 Data content of Physical channels and Signals for NR-FR2-TM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815288 | TP to TS 38.141-1: 4.9.2 Test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815289 | TP to TS 38.141-2: 4.9.2 Test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815290 | TP to TS 38.141-1: Section 4.9.1: RF channels for conducted test applicability table | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815291 | TP to TS 38.141-2: Section 4.9.1: RF channels for OTA tests applicability table | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815292 | TP to 38.141-1: Section 6.6.5 – correction of RF channels for test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815293 | On the Wideband operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815294 | Draft LS reply on wideband carrier operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815295 | TP to 38.141-1: Correction to Section 7.1 Conducted receiver characteristics | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815296 | UE behavior and network configuration with multiple SCS | Huawei, HiSilicon | imported from 3GU |
R4‑1815297 | TP for TS38.141-1 base conformation test models | Huawei, HiSilicon | imported from 3GU |
R4‑1815298 | TP for TS38.141-2 base conformation test models | Huawei, HiSilicon | imported from 3GU |
R4‑1815299 | Boosting patterns in test models in TS38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1815300 | Draft CR to 38.101-1 (5.3.4) RB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1815301 | Draft CR to 38.101-2 (5.3.4) RB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1815302 | PSDCH/PDCCH data content in test models in TS38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1815303 | PSDCH/PDCCH data content in test models in TS38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1815304 | TP to TS 38.141-2: Alignment of test procedure for OTA out-of-band blocking in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1815305 | TP to TS 38.141-2: Improvement of test specification text with respect to directions for OTA out-of-band blocking in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1815306 | TP to TS 38.141-2: Improvement of specification text related to injection of interferer power for OTA TX IMD in sub-clause 6.8 | Ericsson | imported from 3GU |
R4‑1815307 | CR to TR 37.843: Addition of polarization description in clause 2, clause 3 and sub-clause 4.7 | Ericsson | imported from 3GU |
R4‑1815308 | CR to TS 37.105: Improvement of polarization aspects for OTA out-of-band blocking in sub-clauses 10.6 | Ericsson | imported from 3GU |
R4‑1815309 | CR to TS 37.145-2: Improvement of description related to polarization for OTA out-of-band blocking in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1815310 | Draft CR to TS 38.104: Improvement of polarization description for OTA out-of-band blockling in sub-clause 10.6 | Ericsson | imported from 3GU |
R4‑1815311 | TP to TS 38.141-2: Improvement of polarization description for OTA out-of-band blocking in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1815312 | TP to TS 38.141-2: Improvement of polarization description text for in-band blocking in sub-clause 7.5.2 | Ericsson | imported from 3GU |
R4‑1815313 | TP to TS 38.141-2: Improvement of polarization description text for ACS in sub-clause 7.5.1 | Ericsson | imported from 3GU |
R4‑1815314 | TP to TS 38.141-2: Test distance for blocking interferer signal in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1815315 | On test aspects for FR2 TDD OFF power and transient period | Ericsson | imported from 3GU |
R4‑1815316 | TP to TS 38.141-2: Improvement of test procedure for OTA TDD OFF power in sub-clause 6.5 | Ericsson | imported from 3GU |
R4‑1815317 | CR to TR 38.817-02: Addtion of FR2 extreme EIRP requirements in sub-clause 9.2 | Ericsson | imported from 3GU |
R4‑1815318 | TP to TS 38.141-2: Addition of calibration procedure for extreme temperature testing in Annex B.7 | Ericsson | imported from 3GU |
R4‑1815319 | CR to TR 38.817-02: Adding technical background FBW declaration of EIRP in sub-clause 9.2.1 | Ericsson | imported from 3GU |
R4‑1815320 | On improvements of EIRP declarations for wide operating | Ericsson | imported from 3GU |
R4‑1815321 | Draft CR to TS 38.104: Improvement of FBW EIRP declarations in sub-clause 9.2.1 | Ericsson | imported from 3GU |
R4‑1815322 | CR to 38.817-02: Extending background information forradiated transmit power in sub-clause 9.2.1 | Ericsson | imported from 3GU |
R4‑1815323 | On editorial clean-up of co-location general chamber in TR 37.843, clause 10 | Ericsson | imported from 3GU |
R4‑1815324 | CR to TR 37.843: Procedure for RC and framework for MU and MU table | Ericsson | imported from 3GU |
R4‑1815325 | On introduction of RC for TRP measurements | Ericsson, RISE | imported from 3GU |
R4‑1815326 | Reverberation chamber validation measurements | Ericsson | imported from 3GU |
R4‑1815327 | CR to 38.817-02: Addition of RC MU tables for unwanted emission | Ericsson | imported from 3GU |
R4‑1815328 | On FR2 extreme EIRP MU and description of error sources | Ericsson | imported from 3GU |
R4‑1815329 | Draft CR to TS 38.104: Correction to FBW definition in sub-clause 3.1 | Ericsson | imported from 3GU |
R4‑1815330 | TP to TS 38.141-2: Correction to FBW definition in sub-clause 3.1 | Ericsson | imported from 3GU |
R4‑1815331 | TP to TS: Declaration updates and corrections to TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1815332 | Draft CR to TS 38.104: Improvement of FBW EIRP declarations in sub-clause 3.2 | Ericsson | imported from 3GU |
R4‑1815333 | Clarification on LAA channel access for multi-carrier operation and channel bonding supersets | Charter Communications, Inc | imported from 3GU |
R4‑1815334 | Implementing Constant Density Measurement Grids in an Optimal Way | EMITE | imported from 3GU |
R4‑1815335 | LS to Ran Plenary, RAN1, and RAN2 on LAA fair co-existence with Wi-Fi | Charter Communications, Inc | imported from 3GU |
R4‑1815336 | Pcmax computation and evaluation for inter band ENDC | Qualcomm | imported from 3GU |
R4‑1815337 | On how to obtain UE beam peak directions with Reverberation Chamber test method | EMITE | imported from 3GU |
R4‑1815338 | Transient period for SRS Antenna Switching for FR1 | Qualcomm | imported from 3GU |
R4‑1815339 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1815340 | TR 36.716-02-01-020 | Qualcomm Incorporated | imported from 3GU |
R4‑1815341 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1815342 | CR on introduction of 6CCs and 7CCs LAA CA demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1815343 | Noc level definition and SNR range for RF2 RRM testing | Qualcomm Incorporated | imported from 3GU |
R4‑1815344 | NBIOT B26 GB operation | Qualcomm | imported from 3GU |
R4‑1815345 | Transient period to include SRS antenna switching | Qualcomm | imported from 3GU |
R4‑1815346 | TP for TR 37.716-21-11: DC_7-66_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1815347 | CR for TS 36.104 Rel-13: Clarification on LAA channel access | Charter Communications, Inc | imported from 3GU |
R4‑1815348 | TP to TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815349 | NR PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815350 | NR PUCCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815351 | NR PRACH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815352 | CR for TS 36.104 Rel-14: Clarification on LAA and eLAA channel access | Charter Communications, Inc | imported from 3GU |
R4‑1815353 | CR for TS 36.104 Rel-15: Clarification on LAA and eLAA channel access | Charter Communications, Inc | imported from 3GU |
R4‑1815354 | TR for E-UTRA 2.4 GHz TDD Band for US^^ | Nokia, Globalstar | imported from 3GU |
R4‑1815355 | Proposed text for NR introduction TS 37.145-1 - Test Cases and Applicability | Ericsson | imported from 3GU |
R4‑1815356 | Proposed text for NR introduction TS 37.145-2 - Test Cases and Applicability | Ericsson | imported from 3GU |
R4‑1815357 | NB-IoT TDD and UL offset to DL (RAN1 LS request) | Ericsson | imported from 3GU |
R4‑1815358 | LS reply on UL PRB to DL PRB center offset for TDD NB-IoT | Ericsson | imported from 3GU |
R4‑1815359 | Remaining issues for PUCCH demodulation: metric for PUCCH format 2 | Ericsson | imported from 3GU |
R4‑1815360 | Simulation results on PUCCH demodulation | Ericsson | imported from 3GU |
R4‑1815361 | Simulation results on PRACH demodulation | Ericsson | imported from 3GU |
R4‑1815362 | Draft CR to TS 38.104: PUCCH format 0 requirement | Ericsson | imported from 3GU |
R4‑1815363 | TP to TS 38.141-1: PUCCH format 0 requirement testing | Ericsson | imported from 3GU |
R4‑1815364 | TP to TS 38.141-2: PUCCH format 0 requirement testing | Ericsson | imported from 3GU |
R4‑1815365 | BS demodulation - further considerations on applicability rules | Ericsson | imported from 3GU |
R4‑1815366 | Further agreements on NR PRACH demodulation | Ericsson | imported from 3GU |
R4‑1815367 | MSR test configurations for overlapping bands | Ericsson | imported from 3GU |
R4‑1815368 | Draft CR to TS 38.104: merging EVM annexes (B, C) | Huawei | imported from 3GU |
R4‑1815369 | Draft CR to TS 38.104: co-location with NR BS (6.6.5.2.4) | Huawei | imported from 3GU |
R4‑1815370 | TP to TS 38.141-2: remaining annexes | Huawei | imported from 3GU |
R4‑1815371 | TP to TS 38.141-1: additional spurious emissions requirement corrections for PHS and Band n41 (6.6.5.5.1.3) | Huawei | imported from 3GU |
R4‑1815372 | TP to TS 38.141-1: Interpretation of measurement results and the Shared Risk principle | Huawei | imported from 3GU |
R4‑1815373 | TP to TS 38.141-2: narrowest beam selection for OTA testing | Huawei | imported from 3GU |
R4‑1815374 | TP to TS 38.141-2: additional spurious emissions requirement corrections for PHS and Band n41 (6.7.5.4.5.1) | Huawei | imported from 3GU |
R4‑1815375 | TP to TS 38.141-2: Interpretation of measurement results and the Shared Risk principle | Huawei | imported from 3GU |
R4‑1815376 | CR to TS 37.113: introduction of the NR to MSR EMC specification | Huawei | imported from 3GU |
R4‑1815377 | CR to TS 37.113: update of the Voltage dips and interruptions requirement | Huawei | imported from 3GU |
R4‑1815378 | DraftCR to TS 38.104: cleanup for the performance requirements sections (8, 11) | Huawei | imported from 3GU |
R4‑1815379 | DraftCR to TS 38.104: clarification on the use of "RX antennas" for the OTA demodulation (11.1.1) | Huawei | imported from 3GU |
R4‑1815380 | DraftCR to TS 38.104: OTA demodulation branches (11.1.2) | Huawei | imported from 3GU |
R4‑1815381 | TP to 38.141-2: OTA demodulation alignment with TS38.104 (8.1) | Huawei | imported from 3GU |
R4‑1815382 | OTA demodulation testing scope for multiple demodulation branches | Huawei | imported from 3GU |
R4‑1815383 | CR to TS 37.114: additional inputs for introduction of NR to the AAS EMC specification | Huawei | imported from 3GU |
R4‑1815384 | CR to TS 37.114: RAT-specific AAS BS operation terminology corrections | Huawei | imported from 3GU |
R4‑1815385 | CR to TS 37.114: Consideration of the narrowband responses and communication link | Huawei | imported from 3GU |
R4‑1815386 | CR to TS 37.114: clarification on CSA and RCSA capability sets | Huawei | imported from 3GU |
R4‑1815387 | CR to TS 37.145-2: UTRA TDD removal | Huawei | imported from 3GU |
R4‑1815388 | CR to TS 37.145-2: fix for the EUTRA demodulation requirements | Huawei | imported from 3GU |
R4‑1815389 | CR to TS 37.105: Text alignment for the OTA demodulation branches | Huawei | imported from 3GU |
R4‑1815390 | Antenna Interface Function support | Huawei | imported from 3GU |
R4‑1815391 | Draft CR to 38.101-1: Update to UE co-existence requirements | Rohde & Schwarz | imported from 3GU |
R4‑1815392 | Draft CR to 38.101-1: Update to NS_04 requirements | Rohde & Schwarz | imported from 3GU |
R4‑1815393 | Discussion on Noc level for FR1 and SNR definition | Rohde & Schwarz | imported from 3GU |
R4‑1815394 | On Spherical Coverage Measurement Grids for NR FR2 | Rohde & Schwarz | imported from 3GU |
R4‑1815395 | Beam Peak and Spherical Coverage Procedure | Rohde & Schwarz | imported from 3GU |
R4‑1815396 | Addition of Beam Peak direction search and Spherical Coverage to 38.810 | Rohde & Schwarz | imported from 3GU |
R4‑1815397 | Methodology for MIMO OTA FR1 | Rohde & Schwarz | imported from 3GU |
R4‑1815398 | CR to 36.133: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815399 | CR to 25.133: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815400 | CR to 25.123: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815401 | CR introducing out-of-sync RLM test for NB-IoT TDD in normal coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815402 | CR introducing out-of-sync RLM test for NB-IoT TDD in enhanced coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815403 | CR introducing in-sync RLM test for NB-IoT TDD in normal coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815404 | CR introducing in-sync RLM test for NB-IoT TDD in enhanced coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815405 | CR introducing in-sync RLM test for NB-IoT TDD in normal coverage without DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815406 | CR introducing in-sync RLM test for NB-IoT TDD in enhanced coverage without DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815407 | CR introducing Out-of-sync RLM test for NB-IoT TDD in normal coverage without DRX in stand alone mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815408 | CR introducing Out-of-sync RLM test for NB-IoT TDD in enhanced coverage without DRX in guard band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815409 | euCA and known Dormant SCell condition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815410 | LS on UE behaviour for dormant SCell without PCell UL synchronization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815411 | UE known dormant SCell condition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815412 | Measurement accuracy requirements for CA IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815413 | Introduction of IDLE mode measurement accuracy requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815414 | CR introducing test case for enhanced utilization of CA and idle mode measurements for early reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815415 | euCA and direct SCell activation during handover | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815416 | Introducing enhanced utilization of CA and direct activation in HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815417 | CR for introducing CSI-RS-based RLM in EN-DC and SA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815418 | CR for introducing test cases for beam failure detection and link recovery procedure for SA with PCell in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815419 | CR for introducing test cases for beam failure detection and link recovery procedure for SA with PCell in FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815420 | CR for introducing test cases for beam failure detection and link recovery procedure for EN-DC with PSCell in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815421 | CR for introducing test cases for beam failure detection and link recovery procedure for EN-DC with PSCell in FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815422 | CR to section 9.2 NR intra-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815423 | CR to section 9.3 NR inter-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815424 | Clarification on IncMon when UE is configured with EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815425 | CR to Link Recovery Procedures section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815426 | CR to Link Recovery Procedures section 8.5.4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815427 | CR to Link Recovery Procedures section 8.5.5 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815428 | Simulation results for L1-RSRP accuracy measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815429 | CR for L1-RSRP measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815430 | UE RRM measurements and averaging in FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815431 | Draft CR on UE measurement averaging | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815432 | Draft CR on UE spherical measurement coverage | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815433 | NR Beam Failure Detection Discussion | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815434 | NR Link Recovery Discussion | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815435 | NR L1-RSRP measurements and Reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815436 | Cell re-selection delay correction for category M1/M2 UEs | Ericsson | imported from 3GU |
R4‑1815437 | RRC re-establishment delay correction for category M1/M2 UEs | Ericsson | imported from 3GU |
R4‑1815438 | Intra-frequency handover test case for UE category M1/M2 with enhanced SI reading | Ericsson | imported from 3GU |
R4‑1815439 | Inter-frequency handover test case for UE category M1/M2 with enhanced SI reading | Ericsson | imported from 3GU |
R4‑1815440 | Cell re-selection test case for TDD Intra frequency case for UE category NB1 in in-band mode in normal coverage | Ericsson | imported from 3GU |
R4‑1815441 | TDD Inter-frequency RRC Re-establishment for UE category NB1 in In-Band mode under normal coverage | Ericsson | imported from 3GU |
R4‑1815442 | UE Transmit Timing Accuracy Test for category NB1 UE In-Band in Normal coverage | Ericsson | imported from 3GU |
R4‑1815443 | Further discussions on WUS requirements for efeMTC | Ericsson | imported from 3GU |
R4‑1815444 | Updated simulation assumptions for Rel-15 MTC WUS | Ericsson | imported from 3GU |
R4‑1815445 | Further discussions on WUS requirements for Rel-15 NB-IoT | Ericsson | imported from 3GU |
R4‑1815446 | Updated simulation assumptions for Rel-15 NB-IoT WUS | Ericsson | imported from 3GU |
R4‑1815447 | UE Transmit Timing Accuracy Test for category NB1 UE In-Band in Enhanced coverage | Ericsson | imported from 3GU |
R4‑1815448 | UE Timing advance adjustment test Test for category NB1 UE standalone under Enhanced coverage | Ericsson | imported from 3GU |
R4‑1815449 | TDD Intra-frequency RRC Re-establishment for UE category NB1 in In-Band mode under enhanced coverage | Ericsson | imported from 3GU |
R4‑1815450 | Cell re-selection test case for TDD Inter- frequency case for UE category NB1 in in-band mode in enhanced coverage | Ericsson | imported from 3GU |
R4‑1815451 | Cell re-selection test case for TDD Intra frequency case for UE category NB1 in in-band mode in enhanced coverage | Ericsson | imported from 3GU |
R4‑1815452 | Introduction of NPRACH configuration for NB-IoT TDD | Ericsson | imported from 3GU |
R4‑1815453 | Discussions on RRM test case impact due to enhanced MIB/SIB1-BR delays access structures | Ericsson | imported from 3GU |
R4‑1815454 | efeMTC features applicability rule for non-BL CE UEs | Ericsson | imported from 3GU |
R4‑1815455 | Correction of references in CONNECTED mode requirements for category M1 | Ericsson | imported from 3GU |
R4‑1815456 | Correction of references in CONNECTED mode requirements for category M1 | Ericsson | imported from 3GU |
R4‑1815457 | Correction of references in CONNECTED mode requirements for category M1 | Ericsson | imported from 3GU |
R4‑1815458 | Draft reply LS to RAN on LS on LTE UE feature list | Ericsson | imported from 3GU |
R4‑1815459 | Introduction of enhanced PHR for category NB1 | Ericsson | imported from 3GU |
R4‑1815460 | Remaining work on minimum WUS reception requirements for NB-IoT | Ericsson | imported from 3GU |
R4‑1815461 | Introduction of WUS requirements for efeMTC | Ericsson | imported from 3GU |
R4‑1815462 | Clarification of high-velocity requirements for category M1 | Ericsson | imported from 3GU |
R4‑1815463 | Correction of terminology for non-BL CE UE for Rel-15 | Ericsson | imported from 3GU |
R4‑1815464 | Updated simulation results for WUS reception performance for NB-IoT | Ericsson | imported from 3GU |
R4‑1815465 | Method to distinguish vehicle NR UE with 2Rx Exception | Vodafone Romania S.A. | imported from 3GU |
R4‑1815466 | Addition of missing Band 71 in 36.133 NB-IoT bands | Dish Network | imported from 3GU |
R4‑1815467 | Network controlled FR2 IBE relaxations for better FR2 UE MPR performance | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815468 | Draft CR to TR 38.817-02: Addition of description of conducted testing of performance requirements | Ericsson | imported from 3GU |
R4‑1815469 | Correction of hybrid BS demodulation declarations | Ericsson | imported from 3GU |
R4‑1815470 | Correction of hybrid BS demodulation declarations | Ericsson | imported from 3GU |
R4‑1815471 | Correction of hybrid BS demodulation declarations | Ericsson | imported from 3GU |
R4‑1815472 | TP to TS 38.141-1: Addition of declaration of TAB connectors used for demodulation testing | Ericsson | imported from 3GU |
R4‑1815473 | Correction of occupied bandwidth requirement for NR | Ericsson | imported from 3GU |
R4‑1815474 | Addition of NR band n74 | Ericsson, NTT DoCoMo | imported from 3GU |
R4‑1815475 | NR RX narrowband blocking requirement implementation in MSR | Ericsson | imported from 3GU |
R4‑1815476 | Correction of CS16/17 NBB requirement | Ericsson | imported from 3GU |
R4‑1815477 | Correction of narrowband blocking requirement for NR | Ericsson | imported from 3GU |
R4‑1815478 | Draft CR to 38.104: Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815479 | TP to TS 38.141-1: Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815480 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815481 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815482 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815483 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815484 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815485 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1815486 | Draft CR to 38.104: Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1815487 | TP to TS 38.141-2: Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1815488 | Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1815489 | Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1815490 | TP to TS 38.141-1: Correction to description of ACLR test limits | Ericsson | imported from 3GU |
R4‑1815491 | Clarification to ACLR test requirements | Ericsson | imported from 3GU |
R4‑1815492 | Clarification to ACLR test requirements | Ericsson | imported from 3GU |
R4‑1815493 | Clarification to ACLR test requirements | Ericsson | imported from 3GU |
R4‑1815494 | On directions and test requirements for FR1 RX blocking | Ericsson | imported from 3GU |
R4‑1815495 | Correction to directions for FR1 OTA in-band blocking requirement | Ericsson | imported from 3GU |
R4‑1815496 | TP to TS 38.141-2: Correction to RX receiver test directions | Ericsson | imported from 3GU |
R4‑1815497 | Draft CR to 37.843: Correction to directions for in-band blocking requirement | Ericsson | imported from 3GU |
R4‑1815498 | Correction to RX receiver test directions | Ericsson | imported from 3GU |
R4‑1815499 | TP to TS 38.141-1: Correction of manufacturer declarations | Ericsson | imported from 3GU |
R4‑1815500 | Issues with the FR2 uplink sensitivity requirement | Ericsson | imported from 3GU |
R4‑1815501 | Draft CR to 38.104: Correction to FR2 OTA REFSENS requirement | Ericsson | imported from 3GU |
R4‑1815502 | TP to TS 38.141-2: Correction to FR2 OTA REFSENS requirement | Ericsson | imported from 3GU |
R4‑1815503 | Introduction of NR to 37.145-1: General | Ericsson, Nokia | imported from 3GU |
R4‑1815504 | Introduction of NR to 37.145-1: TX parts | Ericsson, Nokia | imported from 3GU |
R4‑1815505 | Introduction of NR to 37.145-1: RX parts | Ericsson, Nokia | imported from 3GU |
R4‑1815506 | Introduction of NR to 37.145-2: General | Ericsson, Nokia | imported from 3GU |
R4‑1815507 | Introduction of NR to 37.145-2: TX parts | Ericsson, Nokia | imported from 3GU |
R4‑1815508 | Introduction of NR to 37.145-2: RX parts | Ericsson, Nokia | imported from 3GU |
R4‑1815509 | Introduction of NR to 37.145-1 | Ericsson | imported from 3GU |
R4‑1815510 | Introduction of NR to 37.145-2 | Ericsson | imported from 3GU |
R4‑1815511 | On link budget for OTA demodulation testing in FR1 | Ericsson | imported from 3GU |
R4‑1815512 | On link budget for OTA demodulation testing in FR2 | Ericsson | imported from 3GU |
R4‑1815513 | Draft CR to 38.104: Correction to annex on EIRP based regulations | Ericsson | imported from 3GU |
R4‑1815514 | Corrections on V2X core requirements in TS36.133 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815515 | Corrections on V2X core requirements in TS36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815516 | Corrections on Conditions for Selection/Reselection to Intra-frequency SyncRef UE R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815517 | Corrections on Conditions for Selection/Reselection to Intra-frequency SyncRef UE R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815518 | Corrections on UE category M1 intra-frequency measurements with CE Mode A R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815519 | Corrections on UE category M1 intra-frequency measurements with CE Mode A R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815520 | Corrections on UE category M1 intra-frequency measurements with CE Mode B R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815521 | Corrections on UE category M1 intra-frequency measurements with CE Mode B R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815522 | Corrections on UE category M1 inter-frequency measurements with CE Mode B R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815523 | Corrections on UE category M1 inter-frequency measurements with CE Mode B R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815524 | Corrections on RSRP and RSRQ measurement accuracy requirements for UE category M1 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815525 | Corrections on RSRP and RSRQ measurement accuracy requirements for UE category M1 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815526 | Discussion on test principles for Synchronization Reference Source Selection/Reselection for V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1815527 | CR on introducing test cases of Synchronization Reference Source Selection/Reselection requirements for V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1815528 | Discussion on test principles for interruptions due to V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1815529 | CR on introducing test cases of interruptions due to V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1815530 | Discussion on the scaling factor CSSF for multiple SCells | Huawei, HiSilicon | imported from 3GU |
R4‑1815531 | DraftCR on the scaling factor CSSF for outside gaps in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815532 | Discussion on defining SMTC overlapping of intra-frequency measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1815533 | DraftCR on defining SMTC period for intra-frequency measurements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815534 | DraftCR on SSB index reading time for inter-freuency measurements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815535 | DraftCR on maintaining UE timing requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815536 | Discussion on beam transition impacts on UE timing requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815537 | DraftCR on modifying UE timing requirements for beam transition in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815538 | Further discussion on L1-RSRP measurement requirements for CBD | Huawei, HiSilicon | imported from 3GU |
R4‑1815539 | DraftCR on modifying candidate beam detection requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815540 | DraftCR on updating conditions for NR measurement accuracy requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815541 | DraftCR on correcting receiver sensitivity relaxation requirments in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815542 | DraftCR on requirement classification for statistical testing in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815543 | DraftCR on correcting applicability rules for RRM test cases in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815544 | DraftCR on correcting RMSI CORESET configurations in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815545 | DraftCR on correcting SSB Configurations in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1815546 | Discussion on defining SNR values in NR RLM tests | Huawei, HiSilicon | imported from 3GU |
R4‑1815547 | Clarification on the applicability of side condition for CE UE R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1815548 | Clarification on the applicability of side condition for CE UE R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1815549 | Clarification on the applicability of side condition for CE UE R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815550 | Clarification of G factor for feMTC RRM test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1815551 | Clarification of G factor for feMTC RRM test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815552 | Applicability of non-BL CE requriements for Cat-1bis | Huawei, HiSilicon | imported from 3GU |
R4‑1815553 | Applicability of non-BL CE requriements for Cat-1bis | Huawei, HiSilicon | imported from 3GU |
R4‑1815554 | Applicability of requirements for non-BL CE UE in Rel-15 | Huawei, HiSilicon | imported from 3GU |
R4‑1815555 | Correction to CRS muting applicability in efeMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1815556 | Requirements for high velocity measurement for efeMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1815557 | CR on TS38.133 for SSB-based intra-frequency measurements (Section 9.2.5 and Section 9.2.6) | MediaTek inc. | imported from 3GU |
R4‑1815558 | Discussion on dual SMTC periodicities | MediaTek inc. | imported from 3GU |
R4‑1815559 | CR on TS38.133 for SSB-based inter-frequency measurements (section 9.3.4 and 9.3.5) | MediaTek inc. | imported from 3GU |
R4‑1815560 | CR on TS38.133 carrier-specific scaling factor for multiple measurement objects (section 9.1.5) | MediaTek inc. | imported from 3GU |
R4‑1815561 | Remaining issues on scaling factor for multiple measurement objects | MediaTek inc. | imported from 3GU |
R4‑1815562 | CR to TS 38.104 on Combined updates from RAN4 #88bis and #89 | Ericsson | imported from 3GU |
R4‑1815563 | Draft CR to 38.101-1 on Clarification on 7.5 KHz raster shift in NR re-farmed bands | Ericsson | imported from 3GU |
R4‑1815564 | Draft CR to 38.104 on Clarification on 7.5 KHz raster shift in NR re-farmed bands | Ericsson | imported from 3GU |
R4‑1815565 | Spread sheet for GSCN raster ranges | Ericsson | imported from 3GU |
R4‑1815566 | Draft CR for TS 38.101-1: Sync raster corrections (5.4.3) | Ericsson | imported from 3GU |
R4‑1815567 | Draft CR for TS 38.104: Sync raster corrections (5.4.3) | Ericsson | imported from 3GU |
R4‑1815568 | Outcome of ECC SE21 meeting #103 concerning spurious emissions | Ericsson, Nokia, Qualcomm | imported from 3GU |
R4‑1815569 | Finalizing BS spurious emission Category B for FR2 | Ericsson | imported from 3GU |
R4‑1815570 | Draft CR to 38.104 on Combined CRs for BS Demodulation performance | Ericsson | imported from 3GU |
R4‑1815571 | Draft CR to 38.104 on Noise definition for BS demodulation | Ericsson | imported from 3GU |
R4‑1815572 | Draft CR to TR 38.817-02 for Conformance testing (Ch 12) after RAN4#88bis | Ericsson | imported from 3GU |
R4‑1815573 | CR to TR 38.817-02 for Conformance testing (Ch 12) after RAN4#89 | Ericsson | imported from 3GU |
R4‑1815574 | LS on Characteristics of IMT-Advanced, IMT-2020 and Advanced Antenna Systems for ITU-R Sharing and Compatibility Studies in the Frequency Band 3 300-3 400 MHz | Ericsson | imported from 3GU |
R4‑1815575 | Introduction of RX beamforming in intrafrequency FR2 requirements for PC4 in section 9.2 | Ericsson, Docomo, Verizon | imported from 3GU |
R4‑1815576 | Introduction of RX beamforming in interfrequency FR2 requirements for PC4 in section 9.3 | Ericsson, Docomo, Verizon | imported from 3GU |
R4‑1815577 | Introduction of RX beamforming in FR2 requirements for PC4 | Ericsson, Docomo, Verizon | imported from 3GU |
R4‑1815578 | Considerations on further enhancements for mobility | Ericsson | imported from 3GU |
R4‑1815579 | Introduction of search window for 4ms MGL in LTE interfrequency requirements | Ericsson | imported from 3GU |
R4‑1815580 | Introduction of search window for short MGL in LTE interRAT requirements section 9.4.1 | Ericsson | imported from 3GU |
R4‑1815581 | CSSFoutside_gap,i definition for FR1+FR2 carrier aggregation | Ericsson | imported from 3GU |
R4‑1815582 | CSSFoutside_gap,i definition for FR1+FR2 carrier in section 9.1.5 | Ericsson | imported from 3GU |
R4‑1815583 | Corrections to DRX cycle for EN-DC operation | Ericsson | imported from 3GU |
R4‑1815584 | Corrections to DRX cycle for EN-DC operation in sections 9.2.x, 9.3.x and 9.4.x | Ericsson | imported from 3GU |
R4‑1815585 | DRX requirements for RRM in EN-DC | Ericsson | imported from 3GU |
R4‑1815586 | Correction of dual SMTC in requierments in 38.133 section 6.1, 6.2, 8.3, 9.1 and 9. | Ericsson | imported from 3GU |
R4‑1815587 | Dual SMTC requirements | Ericsson | imported from 3GU |
R4‑1815588 | Correction of side condition in FR2 handover in section 6.1.1 | Ericsson | imported from 3GU |
R4‑1815589 | Correction of side condition in FR2 handover | Ericsson | imported from 3GU |
R4‑1815590 | Side condition for FR2 handover | Ericsson | imported from 3GU |
R4‑1815591 | Ideal SS-RSRP in OTA tests | Ericsson | imported from 3GU |
R4‑1815592 | RRM test case planning for Q1/2 2019 | Ericsson | imported from 3GU |
R4‑1815593 | RRM test case planning for Q1/2 2019 | Ericsson | imported from 3GU |
R4‑1815594 | Corrections to FR1 SS-RSRP measurement accuracy test for EN-DC NR | Ericsson | imported from 3GU |
R4‑1815595 | Corrections to FR2 SS-RSRP measurement accuracy test for EN-DC NR | Ericsson | imported from 3GU |
R4‑1815596 | FR1 SS-RSRP measurement accuracy test for SA NR | Ericsson | imported from 3GU |
R4‑1815597 | FR2 SS-RSRP measurement accuracy test for SA NR | Ericsson | imported from 3GU |
R4‑1815598 | Corrections to incmon testcases | Ericsson | imported from 3GU |
R4‑1815599 | SIB5 reporting for Idle Mode CA Measurement | Ericsson | imported from 3GU |
R4‑1815600 | SIB5 reporting corrections for Idle Mode CA Measurement | Ericsson | imported from 3GU |
R4‑1815601 | Corrections to incmon testcases | Ericsson | imported from 3GU |
R4‑1815602 | Corrections to incmon testcases | Ericsson | imported from 3GU |
R4‑1815603 | Corrections to incmon testcases | Ericsson | imported from 3GU |
R4‑1815604 | Correction of PCmax requirement for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1815605 | TP for TR 37.716-11-11 NR Inter-band DC x-n260 band combination | Verizon, Ericsson | imported from 3GU |
R4‑1815606 | Discuss FR2 TX OFF and ON/OFF transient | Huawei | imported from 3GU |
R4‑1815607 | TP to TS 38.141-2 - update TX OFF measurement procedure. | Huawei | imported from 3GU |
R4‑1815608 | CR to TR 38.817-02 - capture FR2 TX ON/OFF transient background | Huawei | imported from 3GU |
R4‑1815609 | Discussion on FR2 extreme temperature MU | Huawei | imported from 3GU |
R4‑1815610 | TP to TS 38.141-2 - update FR2 extreme MU and TT | Huawei | imported from 3GU |
R4‑1815611 | draft CR to TR 38.817-02 extreme temperature MU background | Huawei | imported from 3GU |
R4‑1815612 | Discuss open issues on polarisation wording improvements | Huawei | imported from 3GU |
R4‑1815613 | draft CR to TR 38.843 - polarisation wording improvements for OTA sensitivity and reference sensitivity | Huawei | imported from 3GU |
R4‑1815614 | CR to TS 37.105 - polarisation wording improvements for OTA s reference sensitivity | Huawei | imported from 3GU |
R4‑1815615 | CR to TS 37.145-2 - polarisation wording improvements for OTA reference sensitivity | Huawei | imported from 3GU |
R4‑1815616 | CR to TR 38.817-02 - polarisation wording improvements for OTA reference sensitivity | Huawei | imported from 3GU |
R4‑1815617 | TP to TS 38.141-2 - polarisation wording improvements for OTA sensitivity and reference sensitivity | Huawei | imported from 3GU |
R4‑1815618 | draft CR to TR 37.843 - updates from RAN4#88bis | Huawei | imported from 3GU |
R4‑1815619 | Draft CR on LTE RMC for TDD EN-DC UE RF Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1815620 | Draft CR to 38.101-2: FR2 EIS Spherical Coverage Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1815621 | Draft CR to 38.101-2: FR2 Multiband Framework | Qualcomm Incorporated | imported from 3GU |
R4‑1815622 | Draft CR to 38.101-2: FR2 ULCA removal of out-of-scope items for Rel. 15 | Qualcomm Incorporated | imported from 3GU |
R4‑1815623 | Draft CR to 38.101-2: FR2 Max. Input Power UL Configuration | Qualcomm Incorporated, OPPO | imported from 3GU |
R4‑1815624 | dCR for 38.810: Revise formula for FR2 OTA EIS metric | Qualcomm Incorporated | imported from 3GU |
R4‑1815625 | Draft CR to 38.101-2: FR2 EIS DL Signal Polarization Clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1815626 | On OTA EIS metric in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1815627 | On FR2 PC3 UE MB Relaxations | Qualcomm Incorporated | imported from 3GU |
R4‑1815628 | On PC2 UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1815629 | Discussion on LTE RMC for UE RF Test in EN-DC configuration | Qualcomm Incorporated | imported from 3GU |
R4‑1815630 | MRTD Requirements for Inter-band FR1-FR2 NR CA | Qualcomm Incorporated | imported from 3GU |
R4‑1815631 | Further discussions on band 46 intra-band DL LAA Type B multi-carrier channel access structures | Ericsson | imported from 3GU |
R4‑1815632 | CR for TS 36.104 Rel-13: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1815633 | CR for TS 36.104 Rel-14: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1815634 | CR for TS 36.104 Rel-15: Clarification on LAA and eLAA channel access | Ericsson | imported from 3GU |
R4‑1815635 | Reply LS to RAN plenary on channel combinations for LAA in 5GHz | Ericsson | imported from 3GU |
R4‑1815636 | LS to RAN2 on removing a sentence related to restriction for intra-band LAA aggregation with 4 or less carriers | Ericsson | imported from 3GU |
R4‑1815637 | LS to RAN1 for intra-band LAA aggregation | Ericsson | imported from 3GU |
R4‑1815638 | MRTD and MTTD requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1815639 | Draft CR for TS 38.133: MRTD and MTTD for NE-DC | Ericsson | imported from 3GU |
R4‑1815640 | UE capability issues for NE-DC | Ericsson | imported from 3GU |
R4‑1815641 | LS to RAN2 on UE capability for NE-DC | Ericsson | imported from 3GU |
R4‑1815642 | MRTD and MTTD requirements for intra-band synchronous EN-DC | Ericsson | imported from 3GU |
R4‑1815643 | Draft CR for TS 38.133: MRTD and MTTD for intra-band synchornous EN-DC | Ericsson | imported from 3GU |
R4‑1815644 | LS to RAN2 on UE capability related to intra-band synch EN-DC | Ericsson | imported from 3GU |
R4‑1815645 | Overview of UE RF requirements for NR-NR DC | Ericsson | imported from 3GU |
R4‑1815646 | MRTD and MTTD requirements for synchronous NR-NR DC | Ericsson | imported from 3GU |
R4‑1815647 | Draft CR for TS 38.133: MRTD and MTTD for inter-band synchornous NR-NR DC | Ericsson | imported from 3GU |
R4‑1815648 | Further discussions on FR1-FR2 inter-band NR CA MRTD requirements | Ericsson | imported from 3GU |
R4‑1815649 | Way forward on MRTD and MTTD for inter-band NR CA between FR1 and FR2 | Ericsson, CATT, T-Mobile Inc., ZTE, Nokia, Nokia Shanghai Bell, Verizon, AT&T, Vodafone, Orange, NTT Docomo Inc., Deutsche Telekom, Telecom Italia | imported from 3GU |
R4‑1815650 | MTTD requirements for Inter-band NR CA | Ericsson | imported from 3GU |
R4‑1815651 | Draft CR for TS 38.133: MRTD and MTTD for FR1-FR2 inter-band NR CA | Ericsson | imported from 3GU |
R4‑1815652 | Scope and workplan for Rel-15 NR-U SI in RAN4 | Ericsson | imported from 3GU |
R4‑1815653 | Potential spectrum arrangements for NR-U | Ericsson | imported from 3GU |
R4‑1815654 | Assessing the need for adjacent channel coexistence studies in NR-U operation | Ericsson | imported from 3GU |
R4‑1815655 | Information about current regulatory work on 6GHz | Ericsson | imported from 3GU |
R4‑1815656 | On different carrier BW in 5GHz NR-U operation | Ericsson | imported from 3GU |
R4‑1815657 | TP to TR 38.889 V0.1.0 (2018-08): Conclusions from RAN4 on “Study on NR-based Access to Unlicensed Spectrum (Release 16)” | Ericsson | imported from 3GU |
R4‑1815658 | LS to RAN1 on TP to TR 38.889 from RAN4 | Ericsson | imported from 3GU |
R4‑1815659 | Discussion: “RAN1 LS on wideband carrier operation for NR-U” | Ericsson | imported from 3GU |
R4‑1815660 | Reply LS on wideband carrier operation for NR-U | Ericsson | imported from 3GU |
R4‑1815661 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815662 | TR 36.716-04-01 v0.2.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815663 | Draft CR to 25.461: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815664 | CR to 25.104: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815665 | CR to 25.141: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815666 | CR to 36.113: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815667 | CR to 36.141: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815668 | CR to 37.104: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815669 | CR to 37.141: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1815670 | Usage of 5 GHz edge channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815671 | CR for TS 36.104 Rel-13: Clarification on LAA channel access | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815672 | CR for TS 36.104 Rel-14: Clarification on LAA and eLAA channel access | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815673 | CR for TS 36.104 Rel-15: Clarification on LAA and eLAA channel access | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815674 | Introduction of NR operation in MSR specification 37.141 (general) | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1815675 | Introduction of NR operation in MSR specification 37.141 (test configuration related) | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1815676 | Introduction of NR operation in MSR specification 37.141 (transmitter) | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1815677 | Introduction of NR operation in MSR specification 37.141 (receiver) | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1815678 | Introduction of NR operation in MSR specification 37.141 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815679 | Test configurations for MSR with NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815680 | Corrections to NR operation in MSR specification 37.104 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815681 | Discussion on RF parameter for NR V2X | Qualcomm Inc. | imported from 3GU |
R4‑1815682 | CR to TR 38.817-02:Improvements of applicability table (5.6) | NEC | imported from 3GU |
R4‑1815683 | TP to 38.141-2: Radiated transmit power testing extreme environment conditions (6.2) | NEC | imported from 3GU |
R4‑1815684 | CR to TR 38.817-02: Classification of radiated Tx requirements (9.1) | NEC | imported from 3GU |
R4‑1815685 | TP to 38.141-2: OTA receiver spurious emission (7.7) | NEC | imported from 3GU |
R4‑1815686 | TP to 38.141-2: alignment of OTA requirement names | NEC | imported from 3GU |
R4‑1815687 | Draft CR to TS 38.104: Out-of-band blocking/OTA out-of-band blocking co-location requirement | NEC | imported from 3GU |
R4‑1815688 | TP to 38.141-1: Out-of-band blocking co-location requirement (7.5) | NEC | imported from 3GU |
R4‑1815689 | TP to 38.141-2: OTA out-of-band blocking co-location requirement (7.6) | NEC | imported from 3GU |
R4‑1815690 | TP to 38.141-2: Cleanup on OTA modulation quality (6.6) | NEC | imported from 3GU |
R4‑1815691 | TP to 38.141-2: Cleanup on test configurations (4.7) | NEC | imported from 3GU |
R4‑1815692 | NR CSI Reporting Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1815693 | CR to TR 37.843: Adding reverberation chamber in 10.8 | Ericsson | imported from 3GU |
R4‑1815694 | NR PDCCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1815695 | NR PBCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1815696 | Draft CR to TR 38.810 – RRM testing methodology | Intel Corporation | imported from 3GU |
R4‑1815697 | Draft CR to TR 38.810 – UE demodulation testing methodology | Intel Corporation | imported from 3GU |
R4‑1815698 | Spherical coverage performance for UE RRM requirements | Intel Corporation | imported from 3GU |
R4‑1815699 | TP to TS 38.101-4: Requirements applicability | Intel Corporation | imported from 3GU |
R4‑1815700 | General discussion on MIMO layer configuration from RAN2 LS | Ericsson | imported from 3GU |
R4‑1815701 | Reply LS to RAN2 on MIMO layer configuration | Ericsson | imported from 3GU |
R4‑1815702 | NR UE performance test open issues | Ericsson | imported from 3GU |
R4‑1815703 | Simulation results for NR UE PDSCH demodulation tests | Ericsson | imported from 3GU |
R4‑1815704 | Simulation results for NR UE PDCCH demodulation tests | Ericsson | imported from 3GU |
R4‑1815705 | Simulation results for NR UE CSI tests | Ericsson | imported from 3GU |
R4‑1815706 | Summary of alignment and impairment results for NR UE PDCCH demodulation tests | Ericsson | imported from 3GU |
R4‑1815707 | TP on performance specification 38.101-4 Chapterr 5~8 general part with applicability rules | Ericsson | imported from 3GU |
R4‑1815708 | Draft CR to TS 38.104 – PUSCH requirements with CP-OFDM for FR2 | Ericsson | imported from 3GU |
R4‑1815709 | TP to 38.141-2 – PUSCH requirements with CP-OFDM for FR2 | Ericsson | imported from 3GU |
R4‑1815710 | Open issues for FR2 BS Demodulation Simulations with Impairments | Ericsson | imported from 3GU |
R4‑1815711 | Discussion and FR1 simulation results for NR PUSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815712 | FR2 ideal simulation results for NR PUSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1815713 | Simulation results and proposals for network-based CRS interference mitigation UE demodulation tests | Ericsson | imported from 3GU |
R4‑1815714 | CR for demodulation performance requirements for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1815715 | Summary of alignment and impairment results of for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1815716 | NR PDSCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1815717 | exception for NBIOT B26 GB operation | Qualcomm | imported from 3GU |
R4‑1815718 | NR PDSCH SDR Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1815719 | NR RLM Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1815720 | Interruption on Serving Cells due to BWP Switching | Ericsson | imported from 3GU |
R4‑1815721 | Interruption Requirements on LTE Serving Cells due to BWP Switching in EN-DC | Ericsson | imported from 3GU |
R4‑1815722 | Correction to SS-RSRQ Measurement Report Mapping | Ericsson, Mediatek | imported from 3GU |
R4‑1815723 | Analysis of requirements for RRC connection release with redirection from LTE to NR | Ericsson | imported from 3GU |
R4‑1815724 | RRC connection release with redirection delay from LTE to NR | Ericsson | imported from 3GU |
R4‑1815725 | Correction to RRC connection release with redirection delay to NR | Ericsson | imported from 3GU |
R4‑1815726 | Analysis of inter-frequency measurement requirements under colliding SMTC occasions in Idle/Inactive States | Ericsson | imported from 3GU |
R4‑1815727 | Inter-frequency Measurement Requirements under SMTC Collision in Idle/Inactive States | Ericsson, Mediatek, Intel | imported from 3GU |
R4‑1815728 | Phase I-17B: Inter-RAT E-UTRAN Event Trigger Reporting in FR1 in DRX Test Case | Ericsson | imported from 3GU |
R4‑1815729 | Correction to Phase I-17 B: Inter-RAT E-UTRAN Event Trigger Reporting Test Case | Ericsson | imported from 3GU |
R4‑1815730 | Correction to SSB Configurations for RRM Test Cases | Ericsson | imported from 3GU |
R4‑1815731 | Correction to SMTC Configurations for RRM Test Cases | Ericsson | imported from 3GU |
R4‑1815732 | DRX Configurations for RRM Test Cases | Ericsson | imported from 3GU |
R4‑1815733 | Applicability Rules for RRM Test Cases with different SSB configurations | Ericsson | imported from 3GU |
R4‑1815734 | Applicability Rules for RRM Test Cases with Different Channel Bandwidths | Ericsson | imported from 3GU |
R4‑1815735 | Applicability Rules for RRM DC/CA Test Cases with Different Channel Bandwidth Combinations | Ericsson | imported from 3GU |
R4‑1815736 | Applicability Rules for RRM test cases with Different Duplex Modes | Ericsson | imported from 3GU |
R4‑1815737 | Applicability Rules for RRM EN-DC test cases with Synchronous and Asynchronous EN-DC | Ericsson | imported from 3GU |
R4‑1815738 | Further Analysis of SCell Direct Activation and Direct Hibernation at RRC Configuration during HO | Ericsson | imported from 3GU |
R4‑1815739 | Requirements for SCell Direct Activation and Direct Hibernation at RRC Configuration during HO | Ericsson | imported from 3GU |
R4‑1815740 | Hypothetical PDCCH parameters for RLM and BFD | Qualcomm Incorporated | imported from 3GU |
R4‑1815741 | Draft CR on Hypothetical PDCCH parameters for RLM and Beam Failure Detection Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1815742 | CR to 38.133 on Link Recovery Procedures (Section 8.5) | Intel Corporation | imported from 3GU |
R4‑1815743 | Views on PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1815744 | Cleanup in RRM requirements | Ericsson | imported from 3GU |
R4‑1815745 | Corrections in network-based CRS interference mitigation requirements | Ericsson | imported from 3GU |
R4‑1815746 | On sTTI with network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1815747 | Intra-frequency FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1815748 | Intra-frequency HD-FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1815749 | Intra-frequency TDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1815750 | Inter-frequency FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1815751 | Inter-frequency HD-FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1815752 | Inter-frequency TDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1815753 | Correction in FeMTC RSTD test cases | Ericsson | imported from 3GU |
R4‑1815754 | Correction in FeMTC RSTD test cases | Ericsson | imported from 3GU |
R4‑1815755 | Inter-RAT NR measurement accuracy requirements | Ericsson | imported from 3GU |
R4‑1815756 | Side conditions for inter-RAT NR measurements in EN-DC case | Ericsson | imported from 3GU |
R4‑1815757 | Side conditions for inter-RAT NR measurements in non-EN-DC case | Ericsson | imported from 3GU |
R4‑1815758 | Adding references to SUL-related side conditions | Ericsson | imported from 3GU |
R4‑1815759 | Phase 2-21B: FR1-SA interruptions at UL carrier RRC reconfiguration | Ericsson | imported from 3GU |
R4‑1815760 | Phase 2-21B: FR2-SA interruptions at UL carrier RRC reconfiguration | Ericsson | imported from 3GU |
R4‑1815761 | On SFN acquisition requirements for E-UTRA RSTD measurements | Ericsson | imported from 3GU |
R4‑1815762 | SFN acquisition requirements for E-UTRA FDD RSTD measurements | Ericsson | imported from 3GU |
R4‑1815763 | SFN acquisition requirements for E-UTRA TDD RSTD measurements | Ericsson | imported from 3GU |
R4‑1815764 | LS on SFN offset for OTDOA | Ericsson | imported from 3GU |
R4‑1815765 | Beamsweeping in RRC_IDLE mode | Ericsson | imported from 3GU |
R4‑1815766 | Correction in NR RLM | Ericsson | imported from 3GU |
R4‑1815767 | Updates in bands grouping | Ericsson | imported from 3GU |
R4‑1815768 | Introduction of completed LTE CA for 2 bands DL with 2 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1815769 | Band 71 and Band 41 Intra-Band EN_DC Measurements for Back-Off Compensation Scheme and Band 41 MPR | Skyworks Solutions Inc. | imported from 3GU |
R4‑1815770 | Introduction of completed LTE CA for 2 bands DL with 2 band into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1815771 | CR_UE RF requirement on subPRB feature_cat_M1 | Ericsson | imported from 3GU |
R4‑1815772 | CR_UE RF requirement on subPRB feature_cat_M2 | Ericsson | imported from 3GU |
R4‑1815773 | Reply LS discussion to RAN1 NR V2X | Ericsson | imported from 3GU |
R4‑1815774 | Reply LS to RAN1 NR V2X | Ericsson | imported from 3GU |
R4‑1815775 | Adding band B42_B43 RF impact analysis and work plan | Ericsson | imported from 3GU |
R4‑1815776 | 2RX exception receiving- signaling aspect | Ericsson | imported from 3GU |
R4‑1815777 | Revised WID for LTE inter-band CA for 2 bands DL with 2 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1815778 | CQI mapping table for CRS-based PDSCH | Huawei, Hisilicon | imported from 3GU |
R4‑1815779 | CQI mapping table for DMRS-based PDSCH | Huawei, Hisilicon | imported from 3GU |
R4‑1815780 | Simulation results for sTTI PDCCH demodulation requirements | Huawei, Hisilicon | imported from 3GU |
R4‑1815781 | Simulation results for sTTI PDSCH demodulation performance requirements | Huawei, Hisilicon | imported from 3GU |
R4‑1815782 | Discussion on NR performance of CQI test under static and fading | Huawei, Hisilicon | imported from 3GU |
R4‑1815783 | Discussion on NR performance of PMI test | Huawei, Hisilicon | imported from 3GU |
R4‑1815784 | Discussion on NR performance of RI test | Huawei, Hisilicon | imported from 3GU |
R4‑1815785 | Draft CR for TR38.810 - EIRP measurement procedure | Intel | imported from 3GU |
R4‑1815786 | On multi-band support for PC3 | Intel Corporation | imported from 3GU |
R4‑1815787 | Uplink duty cycle control as link failure mitigation technique for FR2 | Intel Corporation | imported from 3GU |
R4‑1815788 | Consideration on antenna measurements of vehicular antennas | Volkswagen AG | imported from 3GU |
R4‑1815789 | Conclusion on Rx link budget evaluation | Volkswagen AG | imported from 3GU |
R4‑1815790 | Revised WID Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1815791 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1815792 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1815793 | TR 36.716-01-01 v0.2.0 Rel-16 LTE Intra-band | Ericsson | imported from 3GU |
R4‑1815794 | TR 38.716-01-01 v0.2.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1815795 | TR 37.716-31-11 v0.2.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1815796 | Introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1815797 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1815798 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1815799 | draft CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1815800 | Rel-15 CR to remove NS_04 requirements | Ericsson | imported from 3GU |
R4‑1815801 | draft CR editorial correction in 38.101-2 | Ericsson | imported from 3GU |
R4‑1815802 | draft CR editorial correction in 38.101-3 | Ericsson | imported from 3GU |
R4‑1815803 | draft CR 38.101-3 for DC_2A-66A_n71B, DC_2A_n71B, DC_66A-n71B | Ericsson, T-Mobile US | imported from 3GU |
R4‑1815804 | TP for 38 716-01-01 for Intra-band n261G_UL, n261H_UL | Ericsson, Verizon | imported from 3GU |
R4‑1815805 | TP for 38 716-01-01 for Intra-band n260(10A), n260(4P) | Ericsson, Verizon | imported from 3GU |
R4‑1815806 | TP for 36.716-02-02 for LTE CA with 2UL 26-48 | Ericsson, SouthernLinc | imported from 3GU |
R4‑1815807 | CR towards TR 37.863-01-01 to correct n260 BW classes | Ericsson, AT&T | imported from 3GU |
R4‑1815808 | CR towards TR 37.863-02-01 to correct n260 BW classes | Ericsson, AT&T | imported from 3GU |
R4‑1815809 | CR towards TR 37.865-01-01 to correct n260 BW classes | Ericsson, AT&T | imported from 3GU |
R4‑1815810 | draft Rel-15 CR to 38.101-2 to include n260 fallbacks needed | Ericsson, AT&T | imported from 3GU |
R4‑1815811 | draft Rel-15 CR to 38.101-3 to correct n260 BW class | Ericsson, AT&T | imported from 3GU |
R4‑1815812 | TP for 37.716-21-11 for 2A-29A_n260, 29A-30A_n260A | Ericsson, AT&T | imported from 3GU |
R4‑1815813 | TP for 37.716-31-11 for EN-DC combinations with n260 | Ericsson, AT&T | imported from 3GU |
R4‑1815814 | draft CR to 38.101-3 for EN-DC combinations with n260 | Ericsson, AT&T | imported from 3GU |
R4‑1815815 | TP for TR 37.716-21-21 for DC_1A_n3A-n78A | Ericsson | imported from 3GU |
R4‑1815816 | TP for TR 37.716-21-21 for DC_3A_n1A-n78A | Ericsson | imported from 3GU |
R4‑1815817 | TP for 37.716-21-11 for 3C-28A_n78 | Ericsson, Telstra | imported from 3GU |
R4‑1815818 | TP for 37.716-31-11 for 1A-3C-28A_n78 | Ericsson, Telstra | imported from 3GU |
R4‑1815819 | TP for 37.716-31-11 for 1A-7A-28A_n78, 1A-7C-28A_n78 | Ericsson, Telstra | imported from 3GU |
R4‑1815820 | TP for 37.716-41-11 for 1A-3A-7A-28A_n78, 1A-3A-7C-28A_n78, 1A-3C-7A-28A_n78 | Ericsson, Telstra | imported from 3GU |
R4‑1815821 | TP for 38 716-01-01 for Intra-band CA_n258B - CA_n258M | Ericsson, Telstra | imported from 3GU |
R4‑1815822 | TP for 36.716-01-01 for 48C_UL | Ericsson | imported from 3GU |
R4‑1815823 | On beam correspondence requirement | Apple Inc. | imported from 3GU |
R4‑1815824 | Draft CR to TS 38.101-2: Introduction of the requirement on beam correspondence | Apple Inc. | imported from 3GU |
R4‑1815825 | EIS Spherical Coverage for FR2 UEs | Apple Inc. | imported from 3GU |
R4‑1815826 | Draft CR to TS 38.101-2: Introducing EIS spherical coverage requirements for PC3 | Apple Inc. | imported from 3GU |
R4‑1815827 | On handover requirements for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815828 | CR for 38.133 on HO requirements for known FR2 cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815829 | Remaining RLM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815830 | CR for 38.133 on remaining RLM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815831 | Discussion about RRC-based BWP switching | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815832 | CR for 38.133 on RRC-based BWP switching delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815833 | CR for 38.133 on interruptions at RRC-based BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815834 | CR for 36.133 on interruptions at RRC-based BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815835 | LS on RRC-based BWP switching delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815836 | Corrections to TC for BWP switch (DCI+timer) FR1 PSCell + FR1 SCell (A.4.5.6.1.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815837 | TC for BWP switch (DCI+timer) FR2 PSCell + FR2 SCell (A.5.5.6.1.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815838 | TC for BWP switch (RRC) FR1 PSCell + FR1 SCell (A.4.5.6.2.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815839 | CR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815840 | TP for 38.141-1 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815841 | TP for 38.141-1 Annex for General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815842 | TP for 38.141-2 Annex for General rules for statistical testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815843 | Draft CR for 38.101-1 adding some 4Rx bands | Huawei, HiSilicon | imported from 3GU |
R4‑1815844 | Reducing AMPR for DC_(n)71AA without Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1815845 | UE Spherical EIRP for the 28GHz and 39GHz bands | Sony | imported from 3GU |
R4‑1815846 | On usage of TS 36.133 for RRM tests involving NR cells | Rohde & Schwarz | imported from 3GU |
R4‑1815847 | Draft CR on Antenna configuration for NR FR2 RRM testing | Rohde & Schwarz | imported from 3GU |
R4‑1815848 | Draft CR on Direction selection for NR FR2 RRM testing | Rohde & Schwarz | imported from 3GU |
R4‑1815849 | Draft CR on SNR and Noc feasibility for NR FR2 RRM testing | Rohde & Schwarz | imported from 3GU |
R4‑1815850 | Workplan for 29 dBm HPUE WID | SPRINT Corporation | imported from 3GU |
R4‑1815851 | Intra-band EN-DC MPR | SPRINT Corporation | imported from 3GU |
R4‑1815852 | Discussion on NR Scell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815853 | CR on NR Scell activation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815854 | Discussion on NR PScell addition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815855 | CR on NR PScell addition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815856 | CR for 38.133 measurement in intra-F and inter-F in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815857 | CR for test cases for SCell (de)activation delay in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815858 | A-MPR Tradeoff for intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815859 | A-MPR for intra-band EN-DC: Per cell group vs. total power | Qualcomm Incorporated | imported from 3GU |
R4‑1815860 | Comparison of A-MPR for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1815861 | Capability signaling related to 1Tx vs. 2Tx | Qualcomm Incorporated | imported from 3GU |
R4‑1815862 | Further Clarification on one or two PA Architecture Capability | Skyworks Solutions Inc. | imported from 3GU |
R4‑1815863 | Draft CR for 38.101-1: Nominal carrier spacing for 30 kHz raster | SPRINT Corporation | imported from 3GU |
R4‑1815864 | Conclusion on Rx link budget evaluation | Volkswagen AG | imported from 3GU |
R4‑1815865 | Draft CR for 38.101-3 Intra-band EN-DC nominal carrier spacing for 30 kHz raster | SPRINT Corporation | imported from 3GU |
R4‑1815866 | CR to 38.101-3 to introduce B41 intra-band EN-DC MPR for non NS04 cases. | Skyworks Solutions Inc. | imported from 3GU |
R4‑1815867 | 8Rx TDD simulation results and discussion | Qualcomm Incorporated | imported from 3GU |
R4‑1815868 | Simulation result for UE demodulation requirement for efeMTC | Qualcomm Incorporated | imported from 3GU |
R4‑1815869 | 1024QAM SDR test applicability | Qualcomm Incorporated | imported from 3GU |
R4‑1815870 | NW CRS-IM demod simulation results | Qualcomm Incorporated | imported from 3GU |
R4‑1815871 | On CQI2MCS tables for sub-slot sTTI fading tests | Qualcomm Incorporated | imported from 3GU |
R4‑1815872 | Remaining items for applicability rule for 8Rx capable UE | Qualcomm Incorporated | imported from 3GU |
R4‑1815873 | On remaining open issues in direct SCell activation requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1815874 | On simulation assumptions for Rel-15 MTC WUS | Qualcomm Incorporated | imported from 3GU |
R4‑1815875 | On simulation assumptions for Rel-15 NB-IoT WUS | Qualcomm Incorporated | imported from 3GU |
R4‑1815876 | Simulation results for NB-IoT TDD NPDCCH and NPDSCH | Qualcomm Incorporated | imported from 3GU |
R4‑1815877 | On reference NPRACH configuration for NB-IOT TDD RRM tests | Qualcomm Incorporated | imported from 3GU |
R4‑1815878 | NR Power Scaling for EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815879 | TR 36.716-03-01-020 | Huawei, HiSilicon | imported from 3GU |
R4‑1815880 | Proposal for automated pre-scan for spurious emissions TRP | Ericsson | imported from 3GU |
R4‑1815881 | Draft CR for TR 37.843: TRP assessment by measurements close to EUT | Ericsson, MVG Industries | imported from 3GU |
R4‑1815882 | Draft CR for TR 37.843: Correction to the TRP integral | Ericsson | imported from 3GU |
R4‑1815883 | Draft CR for TR 37.843: Change of reference | Ericsson | imported from 3GU |
R4‑1815884 | Draft CR for TR 37.843: Change to TRP summation error (SE) | Ericsson | imported from 3GU |
R4‑1815885 | Draft CR for TR 37.843: Removal of TRP integrals precluding other grids | Ericsson | imported from 3GU |
R4‑1815886 | Corrections to TRP grids formula in Annex I and adding reference in Section 6.5 | Ericsson | imported from 3GU |
R4‑1815887 | TRP method measurement matrix | Ericsson | imported from 3GU |
R4‑1815888 | Operating band orthogonal cuts measurement | Ericsson | imported from 3GU |
R4‑1815889 | PCMAX_EN-DC for Inter-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815890 | revised WID for LTE inter-band CA 3DL/1UL | Huawei, HiSilicon | imported from 3GU |
R4‑1815891 | Draft CR for 38.101-3: Pcmax for inter-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815892 | Draft CR for 38.101-3: Pcmax for intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815893 | Introduction of completed LTE CA for 3 bands DL with 1 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1815894 | Draft CR for 38.101-3 B41/n41 Intra-band EN-DC A-MPR | SPRINT Corporation | imported from 3GU |
R4‑1815895 | draft CR on inter-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1815896 | Draft CR for TR 37.843: Removal of alignment to the grid | Ericsson | imported from 3GU |
R4‑1815897 | Draft CR for TR 37.843: Removal of TRP measurement distance requirement | Ericsson | imported from 3GU |
R4‑1815898 | draft CR on CA configuration on bandwidth class F | Huawei, HiSilicon | imported from 3GU |
R4‑1815899 | NR MIMO OTA Ad-hoc meeting notes | CAICT | imported from 3GU |
R4‑1815900 | Clarification on IncMon when UE is configured with EN-DC | Nokia Corporation | imported from 3GU |
R4‑1815901 | NS_04 for B41/n41 intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815902 | On beam correspondence for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1815903 | On channel bandwidth signalling | Huawei, HiSilicon | imported from 3GU |
R4‑1815904 | Reply LS on RAN4 design on channel bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑1815905 | TR 36.716-02-02 Rel-16_v0.2.0 | Huawei Technologies France | imported from 3GU |
R4‑1815906 | On inter-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1815907 | Draft CR for 38.101-3 NS_04 applicability for intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1815908 | On intra-band EN-DC power control | Huawei, HiSilicon | imported from 3GU |
R4‑1815909 | CR 36.133 Inter-RAT and EN-DC SFTD measurement accuracy for FR2 | Ericsson | imported from 3GU |
R4‑1815910 | CR to 36.133 on SFTD measurement requirements (Section 8.17.2, 8.1.2.4.25) | ZTE, MediaTek, Ericsson | imported from 3GU |
R4‑1815911 | Draft CR 38.133 (8.3.2) SCell activation delay in FR2 | Ericsson | imported from 3GU |
R4‑1815912 | WF on SFTD measurement requirements | Ericsson | imported from 3GU |
R4‑1815913 | On measurement gaps and scheduling opportunities | Ericsson | imported from 3GU |
R4‑1815914 | Draft CR 38.133 (9.1.2) Definition of measurement gap | Ericsson | imported from 3GU |
R4‑1815915 | On UE behaviour before and after measurement gap | Ericsson | imported from 3GU |
R4‑1815916 | Draft CR 38.133 (9.1.2) UE behaviour before and after measurement gap | Ericsson | imported from 3GU |
R4‑1815917 | draftCR on DL RMC for TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1815918 | draftCR on contiguous CA ACS for TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1815919 | Draft CR for PScell addition and release delay in FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1815920 | Draft CR for PScell addition and release delay in FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1815921 | Reply LS on design of channel BW | Qualcomm Incorporated | imported from 3GU |
R4‑1815922 | TCI states for RRM test cases | Qualcomm Incorporated | imported from 3GU |
R4‑1815923 | UE behavior in BWP switching across SCS | Qualcomm Incorporated | imported from 3GU |
R4‑1815924 | RRM requirements for TCI state switch | Qualcomm Incorporated | imported from 3GU |
R4‑1815925 | draftCR on SA NR UE Transmit Timing Accuracy Tests in FR1 (Section A.6.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1815926 | draftCR on EN-DC NR UE Transmit Timing Accuracy Tests in FR1 (Section A.4.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1815927 | draftCR on SA NR UE Transmit Timing Accuracy Tests in FR2 (Section A.7.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1815928 | draftCR on EN-DC NR UE Transmit Timing Accuracy Tests in FR2 (Section A.5.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1815929 | Timing adjustment on UE beam switch | Qualcomm Incorporated | imported from 3GU |
R4‑1815930 | draftCR on interruptions during SRS carrier swtiching | Qualcomm Incorporated | imported from 3GU |
R4‑1815931 | Scell activation timeline | Qualcomm Incorporated | imported from 3GU |
R4‑1815932 | CR on 8Rx CA RF requirement for TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1815933 | WF on NR MIMO OTA | CAICT | imported from 3GU |
R4‑1815934 | Draft CR for 38.101-3: MPR for intraband EN-DC in B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1815935 | TP to TR38.827 on scope of NR MIMO OTA | CAICT | imported from 3GU |
R4‑1815936 | On noise floor for FR1 MIMO OTA testing | CAICT, SAICT | imported from 3GU |
R4‑1815937 | On test methods for FR1 MIMO OTA | CAICT, SAICT | imported from 3GU |
R4‑1815938 | SRS carrier switching times | Qualcomm Incorporated | imported from 3GU |
R4‑1815939 | LS on SRS carrier switching times | Qualcomm Incorporated | imported from 3GU |
R4‑1815940 | Freq separation class clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1815941 | LS on freq sepration class | Qualcomm Incorporated | imported from 3GU |
R4‑1815942 | dCR on P-MPR for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1815943 | dCD Coherent UL MIMO parameters for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1815944 | Coherent ULMIMO systems simulations | Qualcomm Incorporated | imported from 3GU |
R4‑1815945 | LTE requirement applicability in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1815946 | LS reply on on LTE requirement applicability | Qualcomm Incorporated | imported from 3GU |
R4‑1815947 | On beam correspondence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1815948 | LS on BC optional vs mandatory | Qualcomm Incorporated | imported from 3GU |
R4‑1815949 | LS reply to Ran2 on SUL+SDl pairing capability | Qualcomm Incorporated | imported from 3GU |
R4‑1815950 | dCR on TS38.101-1 merging draft CRs from RAN4#88 | Qualcomm Incorporated | imported from 3GU |
R4‑1815951 | dCR on TS38.101-2 merging draft CRs from RAN4#89 | Qualcomm Incorporated | imported from 3GU |
R4‑1815952 | dCR on TS38.101-3 merging draft CRs from RAN4#90 | Qualcomm Incorporated | imported from 3GU |
R4‑1815953 | RF Exposure to system performance | Qualcomm Incorporated | imported from 3GU |
R4‑1815954 | Pcmax for FR2 ULCA | Qualcomm Incorporated | imported from 3GU |
R4‑1815955 | LS on UE capability to indicate the maximum supported 1Tx power class | Huawei, HiSilicon | imported from 3GU |
R4‑1815956 | exception for NBIOT B26 GB operation | Qualcomm | imported from 3GU |
R4‑1815957 | exception for NBIOT B26 GB operation | Qualcomm | imported from 3GU |
R4‑1815958 | Mandatory UE NR Channel Bandwidths | SPRINT Corporation | imported from 3GU |
R4‑1815959 | draft reply LS on frequency separation class | Huawei, HiSilicon | imported from 3GU |
R4‑1815960 | Overview of Standing Wave in CATR for both sub6GHz and mmWave | MVG Industries | imported from 3GU |
R4‑1815961 | IMD4 Measurements for Band 41 MSD in DC_5A-41A_n79A | Skyworks Solutions Inc. | imported from 3GU |
R4‑1815962 | TP to TS 38.141-2: general cleanup | Huawei | imported from 3GU |
R4‑1815963 | TP to TS 38.141-2: corrections of notes in declarations table (4.6) | Huawei | imported from 3GU |
R4‑1815964 | Draft CR to TS 38.104: definitions updates (3.1) | Huawei | imported from 3GU |
R4‑1815965 | Discussion on SCS restriction with BWP operation | vivo | imported from 3GU |
R4‑1815966 | Discussion on RF exposure compliance in FR2 | vivo | imported from 3GU |
R4‑1815967 | Further discussion on collision of RRM measurement resources with uplink transmissions in FR1 TDD | vivo | imported from 3GU |
R4‑1815968 | [Draft] Reply LS on collision of RRM measurement resources with uplink transmissions in FR1 TDD RAN2 progress on ANR | vivo | imported from 3GU |
R4‑1815969 | On reference angular steps of spherical grids for TRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815970 | On reference angular steps for in-band TRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815971 | Draft CR to 38.101-3 rel. 15 to fix MPR issue | Apple GmbH | imported from 3GU |
R4‑1815972 | Draft CR to TR 38.817-02: Removal of duplicating text about “Summation error”. | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815973 | Draft CR to 38.101-3 rel. 15 to fix MSD issues for higher order EN-DC combinations | Apple GmbH | imported from 3GU |
R4‑1815974 | Pcmax requirement for inter-band EN-DC | MediaTek Inc. | imported from 3GU |
R4‑1815975 | TP to TS 38.141-2 – adding further details on reference steps to the annex | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815976 | Draft CR to TR 37.843: Removal of duplicating subsections about “Summation error” (Section 10) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1815977 | Simulation assumptions for 8Rx tests | Huawei, HiSilicon | imported from 3GU |
R4‑1815978 | Summary of simulation results for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1815979 | Discussion on test applicability rule for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1815980 | Simulation results on 8Rx demodulation performance for rank lower than 4 | Huawei, HiSilicon | imported from 3GU |
R4‑1815981 | Discuss and simulation results on 8Rx demodulation performance for rank higher than 4 | Huawei, HiSilicon | imported from 3GU |
R4‑1815982 | Discuss and simulation results on 8Rx SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1815983 | Discuss and simulation results on 8Rx CQI tests | Huawei, HiSilicon | imported from 3GU |
R4‑1815984 | CR: applicability and test rules for 8Rx capable UEs | Huawei, HiSilicon | imported from 3GU |
R4‑1815985 | CR: Addition of performance requirements for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1815986 | CR: Addition of SDR test for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1815987 | CR: Addition of CQI tests for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1815988 | CR: Addition of FRC for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1815989 | Discuss and simulation results for FeNB-IoT UE TDD demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1815990 | Discuss and simulation results for FeNB-IoT BS demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1815991 | Simulation results for 1024QAM DL demodulation requirements under fading propagation conditions | Huawei, HiSilicon | imported from 3GU |
R4‑1815992 | Discussion on 1024QAM DL SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1815993 | Discussion and simulation results on 1024QAM DL CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815994 | CR:For 1024QAM DL demodulation requirements under fading propagation conditions | Huawei, HiSilicon | imported from 3GU |
R4‑1815995 | CR: SDR test cases with 1024QAM DL | Huawei, HiSilicon | imported from 3GU |
R4‑1815996 | CR: For 1024QAM DL CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1815997 | Summary of simulation results for 1024QAM DL | Huawei, HiSilicon | imported from 3GU |
R4‑1815998 | Discussion and simulation results for NR PBCH | Huawei, HiSilicon | imported from 3GU |
R4‑1815999 | Discussion and simulation results on NR PDCCH demodulation performances | Huawei, HiSilicon | imported from 3GU |
R4‑1816000 | Discussion and simulation results on NR PDSCH demodulation performances | Huawei, HiSilicon | imported from 3GU |
R4‑1816001 | Discuss and simulation results on NR SDR test | Huawei, HiSilicon | imported from 3GU |
R4‑1816002 | Discuss on PDCCH requirements with AL16 | Huawei, HiSilicon | imported from 3GU |
R4‑1816003 | Discussion on dynamic TDD UL/DL configuration test | Huawei, HiSilicon | imported from 3GU |
R4‑1816004 | Discussion on NR UE soft combing test | Huawei, HiSilicon | imported from 3GU |
R4‑1816005 | TP for updating FR1 PDCCH requirements in TS 38.101-4 section 5.3 | Huawei, HiSilicon | imported from 3GU |
R4‑1816006 | TP of introduction of FR1 CQI requirement (6.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1816007 | TP for performance requirements for interworking (9) | Huawei, HiSilicon | imported from 3GU |
R4‑1816008 | TP for propagation conditions in TS 38.104-4(Annex B) | Huawei, HiSilicon | imported from 3GU |
R4‑1816009 | Discussion on NR PRACH demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1816010 | Simulation results for NR PRACH | Huawei, HiSilicon | imported from 3GU |
R4‑1816011 | Simulation results for NR PUCCH | Huawei, HiSilicon | imported from 3GU |
R4‑1816012 | Discussion on NR PUSCH demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1816013 | Simulation results for NR PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑1816014 | TP for updating 38.104 clause 8 about PUCCH formats 3 and 4 performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1816015 | TP for updating 38.141-1 clause 8 about PUCCH formats 3 and 4 conformance testing | Huawei, HiSilicon | imported from 3GU |
R4‑1816016 | TP for introduing PUCCH format 3 and 4 radiated conformance requirements for OTA test in 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1816017 | TP for introduing propagation conditions in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1816018 | TP for introduing propagation conditions in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1816019 | Proposed text changes for NR PDSCH demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1816020 | Draft CR to TR 37.843: TRP measurement (10.8) – editorial corrections and adding further information on reference angular step criteria | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816021 | Open and closed-loop power tolerance | Ericsson LM | imported from 3GU |
R4‑1816022 | Draft TP on FR2 PDSCH SDR Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816023 | Draft CR 38-101-3 Corrections for EN-DC Single Uplink allowed | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816024 | Draft - Addition parameters about n75 & n76 in TS 37.104 | Huawei, Hisilicon, Vodafone | imported from 3GU |
R4‑1816025 | Draft - Addition parameters about n75 and n76 in TS 37.141 | Huawei, Hisilicon, Vodafone | imported from 3GU |
R4‑1816026 | New WI to add new channel bandwidth for n50 band | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1816027 | Draft - Update of A-MPR tables NS_09, NS_40 and NS_42 TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑1816028 | Draft - Addition parameters about n50 and n51 in TS 37.141 | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1816029 | CR to TS 37.145-2: adding TRP measurement procedures in Annex F. | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1816030 | CR for 36.101: PC2 UTRA ACLR exemption list update | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816031 | Draft CR 38-101-3 Corrections for EN-DC Single Uplink allowed Operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816032 | Draft TP on FR2 Rank Indication Reporting Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816033 | dCR of beam correspondence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816034 | Impact of multi-band spherical relaxation on network performance | Qualcomm Incorporated | imported from 3GU |
R4‑1816035 | Interference margin analysis for link budget in 2Rx exception study | Qualcomm Incorporated | imported from 3GU |
R4‑1816036 | draft CR for measurement BW for spectrum emission mask in FR1 | NTT DOCOMO INC. | imported from 3GU |
R4‑1816037 | CR TS 36.101 Introduction of CA_25A-46D in LAA REFSENS Table | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816038 | Discussion on fractional bandwidth (FBW) | NEC | imported from 3GU |
R4‑1816039 | Draft CR for TS 38.104: Radiated transmit power requirement with wideband operation (9.2) | NEC | imported from 3GU |
R4‑1816040 | TP to TS38.141-2: Radiated transmit power requirement with wideband operation (6.2) | NEC | imported from 3GU |
R4‑1816041 | Draft TP on FR1 Rank Indication Reporting Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816042 | CR TS 36.101 Update of LAA REFSENS exclusion region for B25 and B12 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816043 | CR for 36.101: Introduction of a PC3 UTRA ACLR exemption list | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816044 | Draft TP on FR2 PDSCH Demodulation Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816045 | Draft CR 37.843: Polarization wording improvement – Co-location reference antenna and CLTA cleanup | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816046 | On applicability of EC on FR2 requriements | Qualcomm Incorporated | imported from 3GU |
R4‑1816047 | CR 37.105: Polarization wording improvement – Co-location reference antenna cleanup | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816048 | CR 37.145-2: Polarization wording improvement – Co-location requirements and CLTA cleanup | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816049 | Spectrum regulation and A-MPR applications | Huawei, Hisilicon | imported from 3GU |
R4‑1816050 | TP for TR 37.716-21-11: DC_1A-3C-8A_n78A | KT Corp. | imported from 3GU |
R4‑1816051 | TP for TR 37.716-21-11: DC_3C-8A_n78A | KT Corp. | imported from 3GU |
R4‑1816052 | UE RF Requirements for Rel-15 | Qualcomm Incorporated | imported from 3GU |
R4‑1816053 | CR on introducing test cases of Synchronization Reference Source Selection/Reselection requirements for V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1816054 | CR on introducing test cases of interruptions due to V2X CA | Huawei, HiSilicon | imported from 3GU |
R4‑1816055 | Addition of missing Band 71 in 36.133 NB-IoT bands | Dish Network | imported from 3GU |
R4‑1816056 | Updated simulation assumptions for Rel-15 NB-IoT WUS | Ericsson | imported from 3GU |
R4‑1816057 | Introduction of enhanced PHR for category NB1 | Ericsson | imported from 3GU |
R4‑1816058 | Cell re-selection test case for TDD Intra frequency case for UE category NB1 in in-band mode in normal coverage | Ericsson | imported from 3GU |
R4‑1816059 | Cell re-selection test case for TDD Inter- frequency case for UE category NB1 in in-band mode in enhanced coverage | Ericsson | imported from 3GU |
R4‑1816060 | Cell re-selection test case for TDD Intra frequency case for UE category NB1 in in-band mode in enhanced coverage | Ericsson | imported from 3GU |
R4‑1816061 | TDD idle intra-frequency RSTD measurement test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816062 | TDD idle inter-frequency RSTD measurement test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816063 | TDD Inter-frequency RRC Re-establishment for UE category NB1 in In-Band mode under normal coverage | Ericsson | imported from 3GU |
R4‑1816064 | TDD Intra-frequency RRC Re-establishment for UE category NB1 in In-Band mode under enhanced coverage | Ericsson | imported from 3GU |
R4‑1816065 | TDD contention based random access test case under normal coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816066 | TDD contention based random access test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816067 | TDD contention based random access test case on non-anchor carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1816068 | UE Transmit Timing Accuracy Test for category NB1 UE In-Band in Normal coverage | Ericsson | imported from 3GU |
R4‑1816069 | UE Transmit Timing Accuracy Test for category NB1 UE In-Band in Enhanced coverage | Ericsson | imported from 3GU |
R4‑1816070 | UE Timing advance adjustment test Test for category NB1 UE standalone under Enhanced coverage | Ericsson | imported from 3GU |
R4‑1816071 | CR introducing out-of-sync RLM test for NB-IoT TDD in normal coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816072 | CR introducing out-of-sync RLM test for NB-IoT TDD in enhanced coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816073 | CR introducing in-sync RLM test for NB-IoT TDD in normal coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816074 | CR introducing in-sync RLM test for NB-IoT TDD in enhanced coverage with DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816075 | CR introducing in-sync RLM test for NB-IoT TDD in normal coverage without DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816076 | CR introducing in-sync RLM test for NB-IoT TDD in enhanced coverage without DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816077 | CR introducing Out-of-sync RLM test for NB-IoT TDD in normal coverage without DRX in stand alone mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816078 | CR introducing Out-of-sync RLM test for NB-IoT TDD in enhanced coverage without DRX in guard band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816079 | TDD intra-frequency RSTD measurement accuracy test case under normal coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816080 | TDD inter-frequency RSTD measurement accuracy test case under normal coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816081 | TDD intra-frequency RSTD measurement accuracy test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816082 | TDD inter-frequency RSTD measurement accuracy test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816083 | CR on TDD support in measurement accuracy requirements for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1816084 | Introduction of MSG3-based channel quality reporting test | Ericsson | imported from 3GU |
R4‑1816085 | NB-IoT RSTD accuracy tests using Type 2 NPRS - Rel14 | Qualcomm Incorporated | imported from 3GU |
R4‑1816086 | Corrections to NB-IOT RSTD reporting delay requirements and tests (Rel-14) | Rohde & Schwarz, Spirent Communications | imported from 3GU |
R4‑1816087 | CR on NB random access test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1816088 | CR on NRSRP accuracy applicability for UE Category NB1 and NB2 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1816089 | Updated simulation assumptions for Rel-15 MTC WUS | Ericsson | imported from 3GU |
R4‑1816090 | Correction of terminology for non-BL CE UE for Rel-15 | Ericsson | imported from 3GU |
R4‑1816091 | Requirements for high velocity measurement for efeMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1816092 | Correction to CRS muting applicability in efeMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1816093 | Intra-frequency FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816094 | Intra-frequency HD-FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816095 | Intra-frequency TDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816096 | Inter-frequency FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816097 | Inter-frequency HD-FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816098 | Inter-frequency TDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816099 | Applicability of non-BL CE requriements for Cat-1bis | Huawei, HiSilicon | imported from 3GU |
R4‑1816100 | SIB5 reporting corrections for Idle Mode CA Measurement | Ericsson | imported from 3GU |
R4‑1816101 | Introducing enhanced utilization of CA and direct activation in HO | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816102 | Ad hoc minutes for NR RRM measurement | Ericsson | imported from 3GU |
R4‑1816103 | Ad hoc minutes for LTE RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1816104 | Clarification on IncMon when UE is configured with EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816105 | Correction of dual SMTC in requierments in 38.133 section 6.1, 6.2, 8.3, 9.1 and 9. | Ericsson | imported from 3GU |
R4‑1816106 | Draft CR on UE measurement averaging | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816107 | Draft CR on UE spherical measurement coverage | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816108 | Corrections to DRX cycle for EN-DC operation | Ericsson | imported from 3GU |
R4‑1816109 | Corrections to DRX cycle for EN-DC operation in sections 9.2.x, 9.3.x and 9.4.x | Ericsson | imported from 3GU |
R4‑1816110 | DraftCR on defining SMTC period for intra-frequency measurements in TS38.133 (section 9.2.5 9.2.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1816111 | CR for scheduling availability in 38.133 (section 8.1.7.2, 8.1.7.3, 8.5.7.3, 9.2.5.3.2 and 9.2.5.3.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1816112 | CR to section 9.3 NR inter-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816113 | CR on TS38.133 carrier-specific scaling factor for multiple measurement objects (section 9.1.5) | MediaTek inc. | imported from 3GU |
R4‑1816114 | CR on TS38.133 for SSB-based inter-frequency measurements (section 9.3.4 and 9.3.5) | MediaTek inc. | imported from 3GU |
R4‑1816115 | DraftCR on applicable DRX cycle in EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1816116 | CR on measurement requirements at transitions | Huawei, HiSilicon | imported from 3GU |
R4‑1816117 | SFN acquisition requirements for E-UTRA FDD RSTD measurements | Ericsson | imported from 3GU |
R4‑1816118 | Ad hoc minutes for NR RRM Perf I (general part) | Ericsson | imported from 3GU |
R4‑1816119 | Ad hoc minutes for idle/connected mobility and timing | Samsung | imported from 3GU |
R4‑1816120 | Ad hoc minutes for NR RRM capability, gap related requirement and beam management | Intel | imported from 3GU |
R4‑1816121 | Ad hoc minutes for signaling characteristics | Intel | imported from 3GU |
R4‑1816122 | Ad hoc minutes for NR RRM Perf II (RRM measurement accuracy, mapping and test cases) | Huawei | imported from 3GU |
R4‑1816123 | CR for 38.133 measurement in intra-F and inter-F in idle mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816124 | Inter-frequency Measurement Requirements under SMTC Collision in Idle/Inactive States (4.2.2.4) | Ericsson, Mediatek, Intel | imported from 3GU |
R4‑1816125 | Darft CR for EN-DC MTTD and MRTD requirement (section 7.5 and 7.6) | Samsung | imported from 3GU |
R4‑1816126 | Way forward on impact of FR2 intra-band NC CA MRTD to UE Rx beam switching | Mediatek | imported from 3GU |
R4‑1816127 | Correction on Trs in handover requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1816128 | UE known dormant SCell condition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816129 | Introduction of IDLE mode measurement accuracy requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816130 | CR introducing test case for enhanced utilization of CA and idle mode measurements for early reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816131 | Introducing principle for LTE UE connected to 5GC test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1816132 | CR to 36.133: Introduction of Band 53 | Nokia, Globalstar | imported from 3GU |
R4‑1816133 | Correction to FDD-FS3 Intra-frequency event triggered reporting in DRX | ANRITSU LTD | imported from 3GU |
R4‑1816134 | CR on NRSRP accuracy applicability for UE Category NB1 R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1816135 | Corrections to incmon testcases | Ericsson | imported from 3GU |
R4‑1816136 | CR on TS38.133 for SSB-based intra-frequency measurements (Section 9.2.5 and Section 9.2.6) | MediaTek inc. | imported from 3GU |
R4‑1816137 | On UE feature: short measurement gap | CMCC | imported from 3GU |
R4‑1816138 | Adding references to SUL-related side conditions | Ericsson | imported from 3GU |
R4‑1816139 | Draft CR 38.133 (9.1.2) Definition of measurement gap | Ericsson | imported from 3GU |
R4‑1816140 | Draft CR for 38.133 on applicability for Gap Pattern Configurations (section 9.1.2) | CMCC | imported from 3GU |
R4‑1816141 | CR for 36.133 on E-UTRAN measurement to support gap pattern 4, 6,7,8,10 (section 8.1.2.1, 8.1.2.3.1.2, 8.1.2.3.2.2, 8.17.3) | CMCC, MediaTek, Huawei, HiSilicon | imported from 3GU |
R4‑1816142 | Introduction of search window for 4ms MGL in LTE interfrequency requirements | Ericsson | imported from 3GU |
R4‑1816143 | Introduction of search window for short MGL in LTE interRAT requirements section 9.4.1 | Ericsson | imported from 3GU |
R4‑1816144 | LS on SSB based BFD | Intel | imported from 3GU |
R4‑1816145 | Remaining issues on Candidate beam detection | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816146 | eV2X UE normal PSSCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1816147 | CR for eV2X single link PSSCH tests and PSCCH decoding capability test cases | CATT | imported from 3GU |
R4‑1816148 | Introduction of UE demodulation requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1816149 | Introduction of CQI reporting requirements for eFeMTC | Ericsson | imported from 3GU |
R4‑1816150 | UE demodulation requirements for network-based CRS interference mitigation | Intel Corporation | imported from 3GU |
R4‑1816151 | Summary of alignment and impairment results of for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1816152 | CR for demodulation performance requirements for network-based CRS interference mitigation | Ericsson | imported from 3GU |
R4‑1816153 | Corrections to CA REFSENS exception | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816154 | Corrections of REFSENS exceptions in Rel-14 CAs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816155 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1816156 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1816157 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1816158 | Correction to frequency of CA_4A-7A for MSD with inter-band 2UL | Anritsu Corporation | imported from 3GU |
R4‑1816159 | Correction on REFSENS exception of CA_3A-28A-42C for REL-14 | SoftBank Corp. | imported from 3GU |
R4‑1816160 | Correction on REFSENS exception of CA_3A-28A-42C for REL-15 | SoftBank Corp. | imported from 3GU |
R4‑1816161 | Misc corrections on Rel-15 CAs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816162 | Draft CR on introduction of SRS switch IL in FR1 | OPPO | imported from 3GU |
R4‑1816163 | TP for TR 37.716-21-11: DC_3-41_n77 | KDDI Corporation | imported from 3GU |
R4‑1816164 | TP for TR 37.716-41-11: DC_1-3-41-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1816165 | TP for TR 37.716-41-11: DC_1-3-18-42_n77 | KDDI Corporation | imported from 3GU |
R4‑1816166 | TP for TR 37.716-11-11: DC_8_n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1816167 | TR 37.716-21-11 v0.2.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1816168 | TP for TR 37.716-11-11: UE requirements for DC_3-3_n77, DC_3-3_n78 | CHTTL | imported from 3GU |
R4‑1816169 | TP for 37.716-21-11 for 3C-28A_n78 | Ericsson, Telstra | imported from 3GU |
R4‑1816170 | TR 37.716-31-11 v0.2.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1816171 | TP for 36.716-01-01 for 48C_UL | Ericsson | imported from 3GU |
R4‑1816172 | TP for TR 38.716-01-01 for CA_2DL_n41(2A)_1UL_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1816173 | TP for TR 37.716-21-11: DC_1A-3C-8A_n78A | KT Corp. | imported from 3GU |
R4‑1816174 | TP for 37.716-41-11 for 1A-3A-7A-28A_n78, 1A-3A-7C-28A_n78, 1A-3C-7A-28A_n78 | Ericsson, Telstra | imported from 3GU |
R4‑1816175 | TP for TR 37.716-21-21 for DC_1A_n3A-n78A | Ericsson | imported from 3GU |
R4‑1816176 | TP for TR 37.716-21-21 for DC_3A_n1A-n78A | Ericsson | imported from 3GU |
R4‑1816177 | TP for TR 37.716-21-11: RefSens requirement for DC band combination of Band 5, 41 and n79 | China Telecom | imported from 3GU |
R4‑1816178 | Draft CR for correction for missing agreed DC combinations in Rel-15 for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816179 | Draft CR for EN-DC of 2 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816180 | Draft CR for EN-DC of 3 band LTE and1 band NR for TS 38.101-3 without FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816181 | TP for 37.716-11-11: MSD for inter-band EN DC_3A-n41A | CATT | imported from 3GU |
R4‑1816182 | TP for 37.716-11-11: Interference analysis and requirements for inter-band EN DC_39A-n41A | CATT | imported from 3GU |
R4‑1816183 | TP for TR 37.716-11-11: DC_5_n71 | Huawei, HiSilicon | imported from 3GU |
R4‑1816184 | TP for TR 37.716-11-11: DC_12_n71 | Huawei, HiSilicon | imported from 3GU |
R4‑1816185 | (reserved) | UE RF session | imported from 3GU |
R4‑1816186 | (reserved) | UE RF session | imported from 3GU |
R4‑1816187 | MCG/SCG Abbreviations in TS36.101 in rel-15 | LG Electronics France | imported from 3GU |
R4‑1816188 | CR to TS 36.101 – revision of OOB for B42 | Qualcomm Incorporated | imported from 3GU |
R4‑1816189 | CR to TR 36.715-00-00 – To correct AMPR for CA_NS_09 | Qualcomm Incorporated | imported from 3GU |
R4‑1816190 | CR to TS 36.101 – Add RF requirements for CA 66C | Qualcomm Incorporated | imported from 3GU |
R4‑1816191 | CR to TS 36.101: Implementation of UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1816192 | CR to TS 36.104: Implementation of UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1816193 | CR to TS 36.141: Implementation of UL PRB to DL PRB center offset for TDD NB-IoT | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1816194 | LS reply on UL PRB to DL PRB center offset for TDD NB-IoT | Ericsson | imported from 3GU |
R4‑1816195 | TR 36.716-02-01-020 | Qualcomm Incorporated | imported from 3GU |
R4‑1816196 | Introduction of NR band protection in TS36.101 | Samsung | imported from 3GU |
R4‑1816197 | Draft CR to TS38.101-3_Clarifications on MSD and UL configuration tables for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1816198 | Simplification of EN-DC and CA between FR1 and FR2 UE to UE co-ex table by adopting CA band approach | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816199 | Draft CR on FR1-FR2 UE-to-UE coexistence for TS38.101-1 | LG Electronics France | imported from 3GU |
R4‑1816200 | Draft CR to 38.101-1 on intra-band contiguous CA configurations for FR1 | ZTE Corporation | imported from 3GU |
R4‑1816201 | CR to 37.865-01-01: Corrections on configurations for intra-band CA | ZTE Corporation | imported from 3GU |
R4‑1816202 | Correction to interband EN-DC OOBE emission requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816203 | Receiver requirements for interband EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816204 | LS reply about Phase discontinuity issue | Intel Corporation | imported from 3GU |
R4‑1816205 | Draft CR to TS38.101-2 correcting the Pcmax requirement | Apple Inc. | imported from 3GU |
R4‑1816206 | draft CR on Pcmax for ULCA and limitation on max aggregated ULCA BW | Qualcomm Incorporated, Apple | imported from 3GU |
R4‑1816207 | Draft CR to 38.101-3 rel. 15 to fix MPR issue | Apple GmbH | imported from 3GU |
R4‑1816208 | CR for 36.101: PC2 UTRA ACLR exemption list update | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816209 | Discussion on EIRP multi-band relaxation | OPPO | imported from 3GU |
R4‑1816210 | PCMAX_EN-DC for Inter-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1816211 | Draft CR for 38.101-3: Pcmax for inter-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1816212 | Draft CR for 38.101-3: Pcmax for intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1816213 | Draft CR for 38.101-3 B41/n41 Intra-band EN-DC A-MPR | SPRINT Corporation | imported from 3GU |
R4‑1816214 | Draft CR for 38.101-3: MPR for intraband EN-DC in B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1816215 | TP for TR 38.716-02-00: MSD for CA_n1A-n77A due to the 2nd harmonic | MediaTek Inc. | imported from 3GU |
R4‑1816216 | FR2 multi-band support adhoc minutes | Apple Inc. | imported from 3GU |
R4‑1816217 | Draft CR to 38.101-2 on UE maximum output power with additional requirements | ZTE Corporation | imported from 3GU |
R4‑1816218 | Draft CR for Introducing missing requirement for power class 4 in FR2 for TS 38.101-2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816219 | draft CR of MPR for Power Class 2 in FR2 | LG Electronics | imported from 3GU |
R4‑1816220 | Draft CR to 38.101-2: On FR2 CA MPR v2 | Qualcomm Incorporated | imported from 3GU |
R4‑1816221 | Draft CR to TS38.101-2 correcting the TPC requirement | Apple Inc. | imported from 3GU |
R4‑1816222 | CR on 8Rx CA RF requirement for TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1816223 | Ad-hoc meeting minutes for intra-band EN-DC Pcmax and MPR/A-MPR | SPRINT | imported from 3GU |
R4‑1816224 | Draft CR for 38.101-3 NS_04 applicability for intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1816225 | TP for TR 37.716-41-11: DC band combination of Band 1, 3, 5, 41 and n79 | China Telecom | imported from 3GU |
R4‑1816226 | Intra-band CA UE RX requirements for <2700MHz | Dish Network | imported from 3GU |
R4‑1816227 | Draft CR on Power Class for inter band EN-DC within FR1 | OPPO | imported from 3GU |
R4‑1816228 | Draft CR for reducing AMPR for DC_(n)71AA without Dynamic Power Sharing | Motorola Mobility, T-Mobile | imported from 3GU |
R4‑1816229 | n41 – B40 Coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1816230 | Draft CR to 38.101-1. Introduce RB restriction for n41 – B40 Coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1816231 | Draft CR on output power dynamic for DC | OPPO | imported from 3GU |
R4‑1816232 | LS on SRS carrier switching times | Qualcomm Incorporated | imported from 3GU |
R4‑1816233 | Receiver requirements for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1816234 | CR to 38.101-1: OBB intra-band contiguous CA | Intel Corporation | imported from 3GU |
R4‑1816235 | Ad-hoc meeting minutes for intra-band EN-DC Pcmax and MPR/A-MPR | SPRINT | imported from 3GU |
R4‑1816236 | Band 71 and Band 41 Intra-Band EN_DC Measurements for Back-Off Compensation Scheme and Band 41 MPR | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816237 | Correction for Intra-band contiguous EN-DC A-MPR definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816238 | CR for 36.101: Introduction of a PC3 UTRA ACLR exemption list | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816239 | Draft CR to 38.101-2: On FR2 EESS A-MPR for n258 | Qualcomm Incorporated | imported from 3GU |
R4‑1816240 | Transient period for SRS Antenna Switching for FR1 | Qualcomm | imported from 3GU |
R4‑1816241 | (reserved) | UE RF session | imported from 3GU |
R4‑1816242 | CR to 37.865-01-01: Corrections on configurations for intra-band CA | ZTE Corporation | imported from 3GU |
R4‑1816243 | Draft CR to TS38.101-1_Clarifications on MSD and UL configuration tables for inter-band CA | ZTE Corporation | imported from 3GU |
R4‑1816244 | Draft CR to for EIS test | Apple Inc. | imported from 3GU |
R4‑1816245 | Draft CR to 38.101-2: FR2 EIS DL Signal Polarization Clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1816246 | Draft CR to TS38.101-3: Corrections on TS for MSD calculations based on ENDC bands combination including of bands 1,3,8, n77, and n78 | MediaTek Inc. | imported from 3GU |
R4‑1816247 | Draft CR 38-101-3 Corrections for EN-DC Single Uplink allowed Operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816248 | LS on SRS carrier switching times | Qualcomm Incorporated | imported from 3GU |
R4‑1816249 | LS on flexible PRB resource restriction | Ericsson | imported from 3GU |
R4‑1816250 | draft CR for adding note about the fallback of EN-DC in Applicability of minimum requirements for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816251 | CR MPR for NB-IoT PC6 Rel-15 | Huawei, HiSilicon | imported from 3GU |
R4‑1816252 | Correction of PCmax requirement for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1816253 | Response LS to RAN4 on method to distinguish vehicle UE from handheld UE | GCF CAG | imported from 3GU |
R4‑1816254 | LS on Study on evaluation for 2 RX exception in Rel-15 vehicle mounted UE for NR | 5GAA | imported from 3GU |
R4‑1816255 | Rel-16 NR specifications | RAN4 Chairman | imported from 3GU |
R4‑1816256 | Draft LS reply on NR MIMO layer configuration | Intel Corporation | imported from 3GU |
R4‑1816257 | Draft CR to TS38.101-2 to correct UL CA scope for FR2 in Rel-15 | Apple Inc. | imported from 3GU |
R4‑1816258 | Comibned CR to TR 38.810 after RAN4 #88bis and RAN4 #89 | Intel Corporation | imported from 3GU |
R4‑1816259 | Spherical coverage performance for UE RRM requirements | Intel Corporation | imported from 3GU |
R4‑1816260 | Draft CR for TR38.810 - EIRP measurement procedure | Intel Corporation, Rohde & Schwarz, Keysight, Apple | imported from 3GU |
R4‑1816261 | On Beam Peak Search Measurement Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1816262 | WF on measurement grid for beam peak search and spherical coverage for PC3 Ues | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1816263 | Draft CR to 38.104: Correction to annex on EIRP based regulations | Ericsson | imported from 3GU |
R4‑1816264 | CR to TR 38.817-02:Improvements of applicability table (5.6) | NEC | imported from 3GU |
R4‑1816265 | CR to TR 38.817-02: Classification of radiated Tx requirements (9.1) | NEC | imported from 3GU |
R4‑1816266 | Draft CR to TS 38.104: definitions updates (3.1) | Huawei | imported from 3GU |
R4‑1816267 | draft CR to 38.104: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816268 | WF on fractional bandwidth | Ericsson | imported from 3GU |
R4‑1816269 | CR to TR 38.817-02: Adding technical background FBW declaration of EIRP in sub-clause 9.2.1 | Ericsson | imported from 3GU |
R4‑1816270 | Draft CR for TS 38.104: Correction on fractional bandwidth for NR BS | NTT DOCOMO, INC.,NEC | imported from 3GU |
R4‑1816271 | CR to TR 38.817-02: Addtion of FR2 extreme EIRP requirements in sub-clause 9.2 | Ericsson | imported from 3GU |
R4‑1816272 | Draft CR to TS 38.104: Transmitter OFF power for CA (Section 6.4.1&9.5.2) | ZTE Corporation | imported from 3GU |
R4‑1816273 | TP to TS 38.141-1: Transmit ON/OFF power (Section 6.4) | ZTE Corporation | imported from 3GU |
R4‑1816274 | Draft CR to TS 38.104: EVM annexes (B, C) | Huawei | imported from 3GU |
R4‑1816275 | AH Minutes for NR BS conformance testing | Huawei | imported from 3GU |
R4‑1816276 | TP to TS 38.141-1: Remaining annexes | Huawei, HiSilicon | imported from 3GU |
R4‑1816277 | TP to TS 38.141-2: remaining annexes | Huawei | imported from 3GU |
R4‑1816278 | Draft CR to TR 38.817-02 for Conformance testing (Ch 12) after RAN4#88bis | Ericsson | imported from 3GU |
R4‑1816279 | Draft CR to TS 38.104: Some corrections on OTA RX requirement related to multi-band operation | ZTE Corporation | imported from 3GU |
R4‑1816280 | Draft CR to 38.104: Correction to FR2 OTA REFSENS requirement | Ericsson | imported from 3GU |
R4‑1816281 | TP to TS 38.141-2: Correction to FR2 OTA REFSENS requirement | Ericsson | imported from 3GU |
R4‑1816282 | TP to TS 38.141-1 on manufacturer declarations for NR conducted requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816283 | TP to TS 38.141-1: On Applicability of test configurations | Huawei | imported from 3GU |
R4‑1816284 | TP to TS 38.141-1: Correction to description of ACLR test limits | Ericsson | imported from 3GU |
R4‑1816285 | Clarification to ACLR test requirements | Ericsson | imported from 3GU |
R4‑1816286 | Draft CR to TR 38.817-02: Addition of description of conducted testing of performance requirements | Ericsson | imported from 3GU |
R4‑1816287 | TP to TS 38.141-1: Addition of declaration of TAB connectors used for demodulation testing | Ericsson | imported from 3GU |
R4‑1816288 | TP to TS 38.141-2: general cleanup | Huawei | imported from 3GU |
R4‑1816289 | draft CR to TR 38.843 - polarisation wording improvements for OTA sensitivity and reference sensitivity | Huawei | imported from 3GU |
R4‑1816290 | TP to TS 38.141-2 on manufacturer declarations for NR radiated requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816291 | TP to TS 38.141-2: narrowest beam selection for OTA testing | Huawei | imported from 3GU |
R4‑1816292 | TP to 38.141-2: Radiated transmit power testing extreme environment conditions (6.2) | NEC | imported from 3GU |
R4‑1816293 | TP to TS38.141-2: Radiated transmit power requirement with wideband operation (6.2) | NEC | imported from 3GU |
R4‑1816294 | TP to TS38.141-2: OTA total power dynamic range(Section 6.4.3) | ZTE Corporation | imported from 3GU |
R4‑1816295 | TP to TS 38.141-2: OTA transmitter OFF power (Section 6.5.1) | ZTE Corporation | imported from 3GU |
R4‑1816296 | TP to TS38.141-2: OTA ACLR, UEM and spurious emission (Section 6.7.3) | ZTE Corporation | imported from 3GU |
R4‑1816297 | TP to TS 38.141-2: additional spurious emissions requirement corrections (6.7.5.4.5.1) | Huawei | imported from 3GU |
R4‑1816298 | TP to TS 38.141-2: Correction to RX receiver test directions | Ericsson | imported from 3GU |
R4‑1816299 | Correction to RX receiver test directions | Ericsson | imported from 3GU |
R4‑1816300 | TP to TS 38.141-2 – adding further details on reference steps to the annex | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816301 | Draft CR to TR 38.817-02: Removal of duplicating text about “Summation error”. | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816302 | CR to TS 37.105 - polarisation wording improvements for OTA s reference sensitivity | Huawei | imported from 3GU |
R4‑1816303 | CR to TS 37.145-2 - polarisation wording improvements for OTA reference sensitivity | Huawei | imported from 3GU |
R4‑1816304 | CR to TR 38.817-02 - polarisation wording improvements for OTA reference sensitivity | Huawei | imported from 3GU |
R4‑1816305 | TP to TS 38.141-2 - polarisation wording improvements for OTA sensitivity and reference sensitivity | Huawei | imported from 3GU |
R4‑1816306 | TP to TS 38.141-2_Corrections on transmitter intermodulation (section 3.2 and 6.8) | ZTE Corporation | imported from 3GU |
R4‑1816307 | Draft CR to TS38.104_Transmitter intermodulation(Section 6.7 and 9.8) | ZTE Corporation | imported from 3GU |
R4‑1816308 | TP to TS 38.141-1_Corrections on transmitter intermodulation (section 3.2 and 6.7) | ZTE Corporation | imported from 3GU |
R4‑1816309 | TP to TS 38.141-2 - update FR2 extreme MU and TT | Huawei | imported from 3GU |
R4‑1816310 | draft CR to TR 38.817-02 extreme temperature MU background | Huawei | imported from 3GU |
R4‑1816311 | Draft CR to TS 38.817-02: Measurement uncertainty for Out-of-band Blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816312 | TP to TS 38.141-2: Addition of calibration procedure for extreme temperature testing in Annex B.7 | Ericsson | imported from 3GU |
R4‑1816313 | TP to TS 38.141-2: Test distance for blocking interferer signal in sub-clause 7.6 | Ericsson | imported from 3GU |
R4‑1816314 | WF on OTA OFF power and transient time for FR2 | CATT | imported from 3GU |
R4‑1816315 | TP to 38.141-2: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816316 | Draft CR for TR 37.843: TRP assessment by measurements close to EUT | Ericsson, MVG Industries | imported from 3GU |
R4‑1816317 | TP to 38.141-2^^ Corrections to TRP grids formula in Annex I and adding reference in Section 6.5 | Ericsson | imported from 3GU |
R4‑1816318 | Operating band orthogonal cuts measurement | Ericsson | imported from 3GU |
R4‑1816319 | TP to TS 38.141-2 Correction on declaration | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816320 | CR:For 1024QAM DL demodulation requirements under fading propagation conditions | Huawei, HiSilicon | imported from 3GU |
R4‑1816321 | CR: SDR test cases with 1024QAM DL | Huawei, HiSilicon | imported from 3GU |
R4‑1816322 | CR: For 1024QAM DL CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1816323 | Introduction of Slot/Subslot-PDSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816324 | Introduction of SPDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816325 | Introduction of CQI tests for sTTI | Ericsson | imported from 3GU |
R4‑1816326 | Introduction of SPUCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816327 | CR: applicability and test rules for 8Rx capable UEs | Huawei, HiSilicon | imported from 3GU |
R4‑1816328 | CR: Addition of performance requirements for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1816329 | CR: Addition of FRC for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1816330 | CR: Addition of SDR test for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1816331 | CR: Addition of CQI tests for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1816332 | Updated simulation assumptions for Rel-15 NB-IoT WUS | Ericsson | imported from 3GU |
R4‑1816333 | CR on NB idle state RSTD measurement requirements R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1816334 | Updated simulation assumptions for Rel-15 MTC WUS | Ericsson | imported from 3GU |
R4‑1816335 | Correction of references in CONNECTED mode requirements for category M1 | Ericsson | imported from 3GU |
R4‑1816336 | Cell re-selection delay correction for category M1/M2 UEs | Ericsson | imported from 3GU |
R4‑1816337 | DraftCR on the scaling factor CSSF for outside gaps in TS38.133 (9.1.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816338 | Ad hoc minutes for NR RRM measurement | Ericsson | imported from 3GU |
R4‑1816339 | CR on NB random access test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1816340 | CR for 38.133 on remaining RLM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816341 | CR on Scell activation requirements in FR2 (8.3) | CATT | imported from 3GU |
R4‑1816342 | Applicability for SSB Rx beam in intra-band FR2 (3.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1816343 | CR on updating requirement for BWP switching interruption in TS36.133 (Section 7.32.2.7) | MediaTek inc. | imported from 3GU |
R4‑1816344 | CR on TS38.133 for interruption due to BWP switch (section 8.2.1.2.7 and 8.2.2.2.5) | MediaTek inc. | imported from 3GU |
R4‑1816345 | Adhoc minutes for NR BS demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1816346 | Way Forward for NR BS demodulation general part | Huawei, HiSilicon | imported from 3GU |
R4‑1816347 | Way Forward for NR BS PUSCH demodulation performance | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816348 | Way Forward for NR BS PUCCH demodulation performance | Huawei | imported from 3GU |
R4‑1816349 | Way Forward for NR BS PRACH demodulation performance | Ericsson | imported from 3GU |
R4‑1816350 | TP for introduing propagation conditions in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1816351 | Draft CR to TS 38.104: Performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1816352 | TP to TS 38.141-1: Update of AWGN power level and FRC index for DFT-s-OFDM based PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1816353 | TP to TS 38.141-2: Radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1816354 | Draft CR on PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1816355 | TP for TS 38.141-1 on NR PUCCH format2 conducted performance requirements | Samsung | imported from 3GU |
R4‑1816356 | TP for TS 38.141-2 on NR PUCCH format2 radiated performance requirements | Samsung | imported from 3GU |
R4‑1816357 | Draft CR for TS38.104: Performance requirements for PRACH | CATT | imported from 3GU |
R4‑1816358 | TP to TS38.141-1: Performance requirements for PRACH | CATT | imported from 3GU |
R4‑1816359 | TP to TS38.141-2: Performance requirements for PRACH | CATT | imported from 3GU |
R4‑1816360 | Draft CR on FR2 PUCCH format 1 performance requirement for TS 38.104 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1816361 | TP for TS38.141-2: PUCCH format 1 OTA conformance test | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1816362 | TP to TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816363 | Draft CR to TS 38.104: PUCCH format 0 requirement | Ericsson | imported from 3GU |
R4‑1816364 | TP to TS 38.141-1: PUCCH format 0 requirement testing | Ericsson | imported from 3GU |
R4‑1816365 | TP to TS 38.141-2: PUCCH format 0 requirement testing | Ericsson | imported from 3GU |
R4‑1816366 | DraftCR to TS 38.104: cleanup for the performance requirements sections (8, 11) | Huawei | imported from 3GU |
R4‑1816367 | DraftCR to TS 38.104: clarification on the use of "RX antennas" for the OTA demodulation (11.1.1) | Huawei | imported from 3GU |
R4‑1816368 | DraftCR to TS 38.104: OTA demodulation branches (11.1.2) | Huawei | imported from 3GU |
R4‑1816369 | Draft CR to 38.104 on Noise definition for BS demodulation | Ericsson | imported from 3GU |
R4‑1816370 | Draft CR to TS 38.104 – PUSCH requirements with CP-OFDM for FR2 | Ericsson | imported from 3GU |
R4‑1816371 | TP to 38.141-2 – PUSCH requirements with CP-OFDM for FR2 | Ericsson | imported from 3GU |
R4‑1816372 | CR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816373 | TP for 38.141-1 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816374 | TP for updating 38.104 clause 8 about PUCCH formats 3 and 4 performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1816375 | TP for updating 38.141-1 clause 8 about PUCCH formats 3 and 4 conformance testing | Huawei, HiSilicon | imported from 3GU |
R4‑1816376 | TP for introduing PUCCH format 3 and 4 radiated conformance requirements for OTA test in 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1816377 | draftCR to 38.104 for introduing propagation conditions in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1816378 | TP for introduing propagation conditions in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1816379 | Discussion and simulation results for NR PUSCH | Samsung | imported from 3GU |
R4‑1816380 | Discussion and simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1816381 | Discussion and simulation results for NR PRACH | Samsung | imported from 3GU |
R4‑1816382 | Simulation results for NR PUSCH | CATT | imported from 3GU |
R4‑1816383 | Way forward on 8Rx UE demodulation and CSI | Huawei, HiSilicon | imported from 3GU |
R4‑1816384 | Way forward on 1024QAM demodulation and CSI | Huawei, HiSilicon | imported from 3GU |
R4‑1816385 | TP for propagation conditions in TS 38.104-4(Annex B) | Huawei, HiSilicon | imported from 3GU |
R4‑1816386 | NR PDCCH simulation results | Intel Corporation | imported from 3GU |
R4‑1816387 | Ad-hoc Minutes for UE perforamnce | Samsung | imported from 3GU |
R4‑1816388 | Way forward on NR UE PDSCH demodulation requirements and General aspects | Intel Corporation | imported from 3GU |
R4‑1816389 | Way forward for SDR test cases | NTT DOCOMO | imported from 3GU |
R4‑1816390 | Way forward on NR PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816391 | Way forward for PBCH requirements | CMCC | imported from 3GU |
R4‑1816392 | Way forward for CSI requirements | Samsung | imported from 3GU |
R4‑1816393 | Summary of alignment and impairment results for NR UE PDCCH demodulation tests | Ericsson | imported from 3GU |
R4‑1816394 | Simulation assumption for NR UE CSI requirements | Samsung | imported from 3GU |
R4‑1816395 | FR2 demod: Noc, Band groups and Ref point - TP for TS 38.101-4 | ANRITSU LTD | imported from 3GU |
R4‑1816396 | TP to TS 38.101-4: FR1 PDSCH demodulation requirements (5.2) | Intel Corporation | imported from 3GU |
R4‑1816397 | Draft TP on FR2 PDSCH Demodulation Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816398 | FR2 RRM Side Conditions | Qualcomm Incorporated | imported from 3GU |
R4‑1816399 | RRM test case planning for Q1/2 2019 | Ericsson | imported from 3GU |
R4‑1816400 | 38.133 draft CR: Annex for RRM test case with NR cells verifying RRM requirements in TS36.133 | Intel | imported from 3GU |
R4‑1816401 | Introduction of AoA configuration for FR2 RRM tests (section A.3.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1816402 | CR on RMC for RLM (section A.3.8) | MediaTek inc. | imported from 3GU |
R4‑1816403 | CR on TS38.133 BWP configuration(section A.3.9) | MediaTek inc. | imported from 3GU |
R4‑1816404 | DRX Configurations for RRM Test Cases | Ericsson | imported from 3GU |
R4‑1816405 | Draft CR on Antenna configuration for NR FR2 RRM testing | Rohde & Schwarz | imported from 3GU |
R4‑1816406 | Section A.3 maintenance CR (section A.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1816407 | Ad hoc minutes for LTE UE/BS demodulation | Ericsson | imported from 3GU |
R4‑1816408 | Draft CR for 38.133 on inter-frequency measurement accuracy (section 10.1.4.1, 10.1.9.1, 10.1.14.1) | CMCC | imported from 3GU |
R4‑1816409 | Intra-frequency Relative SS RSRP Accuracy for FR2 | ANRITSU LTD | imported from 3GU |
R4‑1816410 | Reply LS to RAN5 on OTA signaling test cases for FR2 | Anritsu | imported from 3GU |
R4‑1816411 | DraftCR on updating conditions for NR measurement accuracy requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1816412 | DraftCR on correcting receiver sensitivity relaxation requirments in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1816413 | Darft CR for adding note on applicability of value RSRP_127 (section 10.1.6) | Samsung | imported from 3GU |
R4‑1816414 | Way forward on the idle mode reporting | Ericsson | imported from 3GU |
R4‑1816415 | Test case for handover to FR2 NR cell (A.7.3.1) | Intel | imported from 3GU |
R4‑1816416 | Draft CR to 38.133 on NR FR1 inter-RAT handover test cases (section A.6.3.1) | ZTE | imported from 3GU |
R4‑1816417 | Test cases for SCell activation/deactivation in SA | CATT | imported from 3GU |
R4‑1816418 | CR on TS38.133 BWP switch test case(section A4.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1816419 | CR on TS38.133 BWP switch test case(section A5.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1816420 | LS on RRC processing delay for BWP switching | RAN2, Nokia, OPPO | imported from 3GU |
R4‑1816421 | Draft CR to TS 38.113 Test configurations (subclause 4.5) | ZTE Corporation | imported from 3GU |
R4‑1816422 | CR to TS 36.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1816423 | CR to TS 37.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1816424 | Draft CR to TS 38.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1816425 | Draft CR to TS 38.113 (subclause 3.3 ) | ZTE Corporation | imported from 3GU |
R4‑1816426 | Draft CR to TS 38.113 (subclause 4.1) | ZTE Corporation | imported from 3GU |
R4‑1816427 | CR to TS 38.113 | ZTE Corporation | imported from 3GU |
R4‑1816428 | CR to TS 37.113: update of the Voltage dips and interruptions requirement | Huawei | imported from 3GU |
R4‑1816429 | CR to TS 37.114: additional inputs for introduction of NR to the AAS EMC specification | Huawei | imported from 3GU |
R4‑1816430 | CR to TS 37.114: Consideration of the narrowband responses and communication link | Huawei | imported from 3GU |
R4‑1816431 | WF for RX exclusion band extension of BS type 1-O | Ericsson | imported from 3GU |
R4‑1816432 | CR to TS 37.113: Exclusion Bands for Radiated Immunity Test | Ericsson | imported from 3GU |
R4‑1816433 | Draft CR to TS 37.114: Exclusion Bands for Radiated Immunity Test | Ericsson | imported from 3GU |
R4‑1816434 | Draft CR to TS 38.113: Exclusion Bands for Radiated Immunity Test | Ericsson | imported from 3GU |
R4‑1816435 | CR to TS 37.114: Clarification on Exclusion Bands for Radiated Immunity Test in FR2 | Ericsson | imported from 3GU |
R4‑1816436 | Draft CR to TS 38.113: Adjustment of Scope | Ericsson | imported from 3GU |
R4‑1816437 | Draft CR to TS 38.113: Arrangements for establishing a communication link | Ericsson | imported from 3GU |
R4‑1816438 | Draft CR to TS 38.113: Performance criteria for transient phenomena for BS | Ericsson | imported from 3GU |
R4‑1816439 | Draft CR to TS 38.113: Performance criteria for transient phenomena for Ancillary equipment | Ericsson | imported from 3GU |
R4‑1816440 | CR to TR 38.817-02 adding background of RX exclusion band | Ericsson | imported from 3GU |
R4‑1816441 | Draft CR to 38.104: Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1816442 | TP to TS 38.141-1: Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1816443 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1816444 | Cleanup to conducted requirements text | Ericsson | imported from 3GU |
R4‑1816445 | Draft CR to 38.104: Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1816446 | TP to TS 38.141-2: Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1816447 | Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1816448 | Cleanup to OTA requirements text | Ericsson | imported from 3GU |
R4‑1816449 | LS on UTRAN, E-UTRAN and 5G Antenna Interface Function specifications | RAN3, Huawei | imported from 3GU |
R4‑1816450 | NR Test Methods SI ad-hoc meeting notes | Intel Corporation | imported from 3GU |
R4‑1816451 | CR to TR 37.843 v15.1.0 | Huawei | imported from 3GU |
R4‑1816452 | CR to 37.105: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816453 | Draft CR for TS37.105: Clean up multi-band RIBs | CATT | imported from 3GU |
R4‑1816454 | CR to TS 37.145-1: Manufacturer declarations for AAS conducted requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816455 | CR to TS 37.145-2: Manufacturer declarations for AAS radiated requirements testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816456 | Draft CR to TR 37.843: Removal of duplicating subsections about “Summation error” (Section 10) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816457 | Draft CR for TR 37.843: Removal of TRP integrals precluding other grids | Ericsson | imported from 3GU |
R4‑1816458 | Draft CR for TR 37.843: Removal of alignment to the grid | Ericsson | imported from 3GU |
R4‑1816459 | Draft CR for TR 37.843: Removal of TRP measurement distance requirement | Ericsson | imported from 3GU |
R4‑1816460 | CR to 37.145-2: Corrections to co-location requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816461 | CR to TS 37.145-2: fix for the EUTRA demodulation requirements | Huawei | imported from 3GU |
R4‑1816462 | Correction of hybrid BS demodulation declarations | Ericsson | imported from 3GU |
R4‑1816463 | LS reply on NR MIMO layer configuration | Intel Corporation | imported from 3GU |
R4‑1816464 | Introduction of band 53 into TS 25.101 | Nokia, Globalstar | imported from 3GU |
R4‑1816465 | Draft Response LS on UE capability for SUL and SDL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816466 | Draft CR on some changes for SUL band combinations to TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1816467 | Draft CR to38.104 Support of 7.5 kHz carrier shift for additional operating bands | Ericsson, KDDI | imported from 3GU |
R4‑1816468 | Support of 7.5 kHz carrier shift for additional operating bands | Ericsson, KDDI | imported from 3GU |
R4‑1816469 | draft CR to 38.101-1: SUL clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816470 | draft CR to 38.101-3: SUL clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816471 | LTE and NR band combinations definition | Intel Corporation | imported from 3GU |
R4‑1816472 | LTE and NR band combinations definition | Intel Corporation | imported from 3GU |
R4‑1816473 | Introduction of NR operation in MSR specification 37.141 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816474 | Introduction of NR to 37.145-1 | Ericsson | imported from 3GU |
R4‑1816475 | Introduction of NR to 37.145-2 | Ericsson | imported from 3GU |
R4‑1816476 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1816477 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1816478 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1816479 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1816480 | Correction of CS16/17 NBB requirement | Ericsson | imported from 3GU |
R4‑1816481 | Correction of narrowband blocking requirement for NR | Ericsson | imported from 3GU |
R4‑1816482 | CR to TS 37.114: Clarification on Exclusion Bands for Radiated Immunity Test in FR2 | Ericsson | imported from 3GU |
R4‑1816483 | CR to TS 36.113 (subclause 2 and 8.4.2 ) | ZTE Corporation | imported from 3GU |
R4‑1816484 | TP to TS 38.141-2: Improvement of specification text related to injection of interferer power for OTA TX IMD in sub-clause 6.8 | Ericsson | imported from 3GU |
R4‑1816485 | TP on 38.141-2: Deletion of test procedure on OFF power and transient period for FR2 | CATT | imported from 3GU |
R4‑1816486 | DraftCR to TR 37.843 – adding further details on reference steps | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816487 | Introduction of SPUCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816488 | Way forward on NR UE PDSCH demodulation requirements and General aspects | Intel Corporation | imported from 3GU |
R4‑1816489 | Way forward for SDR test cases | NTT DOCOMO | imported from 3GU |
R4‑1816490 | Way forward for PBCH requirements | CMCC | imported from 3GU |
R4‑1816491 | Way forward for CSI requirements | Samsung | imported from 3GU |
R4‑1816492 | Test cases for BWP switching in SA (A.6.5 and A.7.5) | CATT | imported from 3GU |
R4‑1816493 | TC for BWP switch (DCI+timer) FR2 PSCell + FR2 SCell (A.5.5.6.1.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816494 | TC for BWP switch (RRC) FR1 PSCell + FR1 SCell (A.4.5.6.2 A.5.5.6.2 A.6.5.6.2 A.7.5.6.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816495 | CR for adding SSB configuration for L1-RSRP tests (A.3.1.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1816496 | TC for EN-DC CSI-RS based L1-RSRP measurement for FR1 (section A.4.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816497 | TC for EN-DC SSB based L1-RSRP measurement for FR1 (section A.4.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816498 | TC for EN-DC CSI-RS based L1-RSRP measurement for FR2 (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816499 | TC for EN-DC SSB based L1-RSRP measurement for FR2 (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816500 | TC for SA CSI-RS based L1-RSRP measurement for FR1 (section A.6.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816501 | TC for SA SSB based L1-RSRP measurement for FR1 (section A.6.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816502 | TC for SA CSI-RS based L1-RSRP measurement for FR2 (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816503 | TC for SA SSB based L1-RSRP measurement for FR2 (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816504 | CR for introducing test cases for beam failure detection and link recovery procedure for SA with PCell in FR1 (A.4.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816505 | CR for introducing test cases for beam failure detection and link recovery procedure for SA with PCell in FR2 (A.4.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816506 | CR for introducing test cases for beam failure detection and link recovery procedure for EN-DC with PSCell in FR1 (A.4.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816507 | CR for introducing test cases for beam failure detection and link recovery procedure for EN-DC with PSCell in FR2 (A.4.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816508 | Draft CR for PScell addition and release delay in FR1 (A.4.8.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1816509 | Draft CR for PScell addition and release delay in FR1 (A.5.8.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1816510 | Test case for EN-DC UE UL carrier RRC reconfiguration Delay (section A.4.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816511 | Test case for NR standalone UE UL carrier RRC reconfiguration Delay (section A.6.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816512 | Idle mode cell reselection test cases list | Huawei, HiSilicon | imported from 3GU |
R4‑1816513 | Cell reselection to intra-frequency NR test cases for FR1 (section A.6.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816514 | Cell reselection to FR1 inter-frequency NR test cases for FR1 (section A.6.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816515 | Cell reselection to higher priority E-UTRAN test cases (section A.6.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1816516 | Cell reselection to intra-frequency NR test cases for FR2 (section A.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816517 | Cell reselection to FR2 inter-frequency NR test cases for FR2 (section A.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816518 | Maintenance CR for intra cell search test cases EN-DC FR1 (section A.4.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816519 | Maintenance CR for intra cell search test cases EN-DC FR2 (section A.5.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816520 | Maintenance CR for intra cell search test cases SA FR1 (section A.6.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816521 | Maintenance CR for intra cell search test cases SA FR2 (section A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816522 | CR on test cases for inter-frequency measurement in EN-DC with PScell in FR2 (section A.5.6.2) | Intel Corporation | imported from 3GU |
R4‑1816523 | CR on test cases for inter-frequency measurement in SA with PCell in FR2 (section A.7.6.2) | Intel Corporation | imported from 3GU |
R4‑1816524 | Phase I-17B: Inter-RAT E-UTRAN Event Trigger Reporting in FR1 in DRX Test Case | Ericsson | imported from 3GU |
R4‑1816525 | Correction to Phase I-17 B: Inter-RAT E-UTRAN Event Trigger Reporting Test Case | Ericsson | imported from 3GU |
R4‑1816526 | Corrections to FR1 SS-RSRP measurement accuracy test for EN-DC NR (A.4.7.1.1) | Ericsson | imported from 3GU |
R4‑1816527 | Corrections to FR2 SS-RSRP measurement accuracy test for EN-DC NR (A.5.7.1.1) | Ericsson | imported from 3GU |
R4‑1816528 | FR1 SS-RSRP measurement accuracy test for SA NR (A.6.7.1.1) | Ericsson | imported from 3GU |
R4‑1816529 | FR2 SS-RSRP measurement accuracy test for SA NR (A.7.7.1.1) | Ericsson | imported from 3GU |
R4‑1816530 | Maintenace of TC for EN-DC FR1 inter-f RSRP accuracy (section A.4.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816531 | Maintenace of TC for EN-DC FR2 inter-f RSRP accuracy (section A.5.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816532 | Maintenace of TC for SA FR1 inter-f RSRP accuracy (section A.6.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816533 | Maintenace of TC for SA FR2 inter-f RSRP accuracy (section A.7.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816534 | draftCR on EN-DC NR UE Transmit Timing Accuracy Tests in FR1 (Section A.4.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1816535 | draftCR on EN-DC NR UE Transmit Timing Accuracy Tests in FR2 (Section A.5.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1816536 | draftCR on SA NR UE Transmit Timing Accuracy Tests in FR1 (Section A.6.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1816537 | draftCR on SA NR UE Transmit Timing Accuracy Tests in FR2 (Section A.7.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1816538 | CR on Timing advance Test for EN-DC (A.4.4.3 & A.5.4.3) | Intel | imported from 3GU |
R4‑1816539 | CR on Timing advance Test for SA (A.6.4.3 & A.7.4.3) | Intel | imported from 3GU |
R4‑1816540 | CR on TS38.133 for EN-DC FR1 SSB based RLM (section A.4.5.1.1, A.4.5.1.2, A.4.5.1.3, A.4.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1816541 | CR on TS38.133 for EN-DC FR2 SSB based RLM (section A.5.5.1.1, A.5.5.1.2, A.5.5.1.3, A.5.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1816542 | CR on TS38.133 for SA FR1 SSB based RLM (section A.6.5.1.1, A.6.5.1.2, A.6.5.1.3, A.6.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1816543 | CR on TS38.133 for SA FR2 SSB based RLM (section A.7.5.1.1, A.7.5.1.2, A.7.5.1.3, A.7.5.1.4) | MediaTek inc. | imported from 3GU |
R4‑1816544 | CR for test cases for SCell (de)activation delay in EN-DC (A.4.5.3 A.5.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816545 | Correction and updates to test cases for interruption at transitions in EN-DC (A.4.5.2, A.5.5.2) | CATT | imported from 3GU |
R4‑1816546 | Correction and updates to test cases for interruption due to deactivated SCell operations in EN-DC (A.4.5.2, A.5.5.2) | CATT | imported from 3GU |
R4‑1816547 | Corrections to TC for BWP switch (DCI+timer) FR1 PSCell + FR1 SCell (A.4.5.6.1.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816548 | Maintenance CR for SUL test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1816549 | Draft CR for correction of random access test cases for FR2 (section A.5.3.2.2 and A.7.3.2.2) | Samsung | imported from 3GU |
R4‑1816550 | Corrections in network-based CRS interference mitigation requirements | Ericsson | imported from 3GU |
R4‑1816551 | CR on test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Intel Corporation | imported from 3GU |
R4‑1816552 | CR on test cases for inter-frequency measurement in SA with PCell in FR1 (section A.6.6.2) | Intel Corporation | imported from 3GU |
R4‑1816553 | Reply LS on the interruption time during mobility in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1816554 | (reserved) | RD session | imported from 3GU |
R4‑1816555 | CR to TS38.101-1 | Qualcomm Incorporated | imported from 3GU |
R4‑1816556 | CR to TS38.101-2 | Qualcomm Incorporated | imported from 3GU |
R4‑1816557 | CR to TS38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1816558 | CR to TS 38.133 | Intel Corporation | imported from 3GU |
R4‑1816559 | TS 38.101-4 V0.2.0 | Samsung | imported from 3GU |
R4‑1816560 | TS 38.141-1 v1.2.0 | Huawei | imported from 3GU |
R4‑1816561 | TS 38.141-2 v1.2.0 | Huawei | imported from 3GU |
R4‑1816562 | CR to TS 38.113 | ZTE Corporation | imported from 3GU |
R4‑1816563 | (reserved) | RD session | imported from 3GU |
R4‑1816564 | (reserved) | RD session | imported from 3GU |
R4‑1816565 | TDD idle intra-frequency RSTD measurement test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816566 | TDD idle inter-frequency RSTD measurement test case under enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑1816567 | SIB5 reporting corrections for Idle Mode CA Measurement | Ericsson | imported from 3GU |
R4‑1816568 | LS on UE behaviour for dormant SCell without PCell UL synchronization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816569 | NB-IoT RSTD accuracy tests using Type 2 NPRS - Rel14 | Qualcomm Incorporated | imported from 3GU |
R4‑1816570 | NB-IoT RSTD accuracy tests using Type 2 NPRS - Rel15 | Qualcomm Incorporated | imported from 3GU |
R4‑1816571 | Intra-frequency FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816572 | Intra-frequency HD-FDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816573 | Intra-frequency TDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816574 | Inter-frequency TDD test cases for RSTD measurement period under new measurement gaps for CE Mode B | Ericsson | imported from 3GU |
R4‑1816575 | Test case for EN-DC UE UL carrier RRC reconfiguration Delay (section A.4.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816576 | Test case for NR standalone UE UL carrier RRC reconfiguration Delay (section A.6.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1816577 | WF on OTA OFF power and transient time for FR2 | CATT | imported from 3GU |
R4‑1816578 | Draft CR for TR 37.843: TRP assessment by measurements close to EUT | Ericsson, MVG Industries | imported from 3GU |
R4‑1816579 | CR to 37.145-2: MU clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816580 | Corrections to DRX cycle for EN-DC operation | Ericsson | imported from 3GU |
R4‑1816581 | Introduction of RX beamforming in interfrequency FR2 requirements for PC4 in section 9.3 | Ericsson, Docomo, Verizon | imported from 3GU |
R4‑1816582 | CR on measurement requirements at transitions | Huawei, HiSilicon | imported from 3GU |
R4‑1816583 | SFN acquisition requirements for E-UTRA FDD RSTD measurements (9.4.4) | Ericsson | imported from 3GU |
R4‑1816584 | Correction of side condition in FR2 handover in section 6.1.1 | Ericsson | imported from 3GU |
R4‑1816585 | Correction of side condition in FR2 handover | Ericsson | imported from 3GU |
R4‑1816586 | CR on updating requirement for BWP switching interruption in TS36.133 (Section 7.32.2.7) | MediaTek inc. | imported from 3GU |
R4‑1816587 | CR to BFD requriements (section 8.5.2, 8.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1816588 | CR to Link Recovery Procedures section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816589 | CR for L1-RSRP measurement requirement (section 8.7 9.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1816590 | CR to L1-RSRP scheduling restriction (section 9.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1816591 | CR for L1-RSRP measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816592 | TP to TS 38.141-1: PUCCH format 0 requirement testing | Ericsson | imported from 3GU |
R4‑1816593 | TP to TS 38.141-2: PUCCH format 0 requirement testing | Ericsson | imported from 3GU |
R4‑1816594 | WF for test case SNR derivation procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816595 | Way Forward on PCmax of LTE V2X | Qualcomm Inc. | imported from 3GU |
R4‑1816596 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1816597 | Preliminary MPR Measurements for DC_3_n3 for 1 and 2 UL antenna architecture | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816598 | n65 MPR/A-MPR addition to 38.101-1 | Dish Network | imported from 3GU |
R4‑1816599 | Draft CR for 38.101-3: MPR for intraband EN-DC in B41/n41 | SPRINT Corporation | imported from 3GU |
R4‑1816600 | CR_UE RF requirement on subPRB feature_cat_M1 | Ericsson | imported from 3GU |
R4‑1816601 | CR to TS 36.101 – Add RF requirements for CA 66C | Qualcomm Incorporated | imported from 3GU |
R4‑1816602 | Revised WID for LTE inter-band CA for 2 bands DL with 2 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1816603 | CR for 36.101: Introduction of a PC3 UTRA ACLR exemption list | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816604 | TDD configuration for UE Tx test in FR1 | Ericsson | imported from 3GU |
R4‑1816605 | TDD configuration for UE Tx test in FR2 | Ericsson | imported from 3GU |
R4‑1816606 | (reserved) | UE RF session | imported from 3GU |
R4‑1816607 | LTE TDD configuration for UE Tx test in EN-DC | Ericsson | imported from 3GU |
R4‑1816608 | Draft CR on LTE RMC for TDD EN-DC UE RF Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1816609 | Reply LS on simultaneous LTE and NR transmissions in EN-DC | Ericsson | imported from 3GU |
R4‑1816610 | WF on TDD configuration for UE Tx test | Ericsson | imported from 3GU |
R4‑1816611 | LS reply on on LTE requirement applicability | Qualcomm Incorporated | imported from 3GU |
R4‑1816612 | WF on Phase discontinuity issue | Intel Corporation | imported from 3GU |
R4‑1816613 | Draft CR for reducing AMPR for DC_(n)71AA without Dynamic Power Sharing | Motorola Mobility, T-Mobile | imported from 3GU |
R4‑1816614 | WF on B40 – n41 Coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1816615 | WF on PC2 UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1816616 | Draft CR for 38.101-3: Pcmax for inter-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1816617 | LS to RAN2 on UE signalling for Xscale | SPRINT Corporation | imported from 3GU |
R4‑1816618 | LS to RAN2 on UE signalling for Xscale | SPRINT Corporation | imported from 3GU |
R4‑1816619 | AH1 beam correspondence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816620 | AH2 beam correspondence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816621 | Introduction of maxUplinkDutyCycle to ENDC HPUE in FR1 | OPPO | imported from 3GU |
R4‑1816622 | AH3 beam correspondence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816623 | LS on new UE capability for intra-band EN-DC and intra-band NR UL CA | CHTTL | imported from 3GU |
R4‑1816624 | Draft CR to reflect the completed NR inter band CA/DC combinations into Rel-16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1816625 | (reserved) | UE RF session | imported from 3GU |
R4‑1816626 | Draft CR to TS 38.101-2: Introducing multi-band applicability for PC3 | Apple Inc. | imported from 3GU |
R4‑1816627 | Verification of beam correspondence | Ericsson, Sony | imported from 3GU |
R4‑1816628 | LS on the beam correspondence requirement and multi-band applicability framework for FR2 power class 3 Ues | Apple | imported from 3GU |
R4‑1816629 | WF on handling of ETC requirement in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816630 | draft CR for clarification on PC2 UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1816631 | Ad-hoc2 meeting minutes for intra-band EN-DC Pcmax and MPR/A-MPR | SPRINT | imported from 3GU |
R4‑1816632 | draft CR for clarification on PC2 UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1816633 | draft CR on UE type for Power Class 2 in FR2 | LG Electronics, SK Telecom, KT, LG Uplus, Sumitomo Elec. Industries Ltd | imported from 3GU |
R4‑1816634 | Draft CR to 38.101-2: FR2 EIS Spherical Coverage Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1816635 | LS on form factor desens during FR2 test | OPPO | imported from 3GU |
R4‑1816636 | On multi-band support for PC3 | Intel Corporation | imported from 3GU |
R4‑1816637 | RFE compliance in FR2 – ad-hoc minutes | Intel Corporation | imported from 3GU |
R4‑1816638 | Pcmax computation and evaluation for inter band ENDC | Qualcomm | imported from 3GU |
R4‑1816639 | Verification of beam correspondence | Ericsson, Sony | imported from 3GU |
R4‑1816640 | CR for TS 38.307: FR2 UL CA BW class correction | Apple Inc. | imported from 3GU |
R4‑1816641 | Draft CR for RF exposure compliance in TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1816642 | ACS and IBB intra-band contiguous requirements for all BW Classes | Intel Corporation | imported from 3GU |
R4‑1816643 | LS reply about Phase discontinuity issue | Intel Corporation | imported from 3GU |
R4‑1816644 | Draft CR to TS 38.101-2: Temperature Condition for testing EIRP Spherical Coverage requirement | Apple Inc. | imported from 3GU |
R4‑1816645 | TP to TR38.819: UE aspect issues | Dish Network, HNS | imported from 3GU |
R4‑1816646 | Adhoc meeting minutes on 2 RX | Samsung | imported from 3GU |
R4‑1816647 | Updated WF on 2 Rx vehicle UE: Link budget simulation assumptions | Vodafone Romania S.A. | imported from 3GU |
R4‑1816648 | Draft CR on 2Rx exceptions for vehicle mounted NR UE | LG Electronics Deutschland | imported from 3GU |
R4‑1816649 | Adhoc meeting minutes on 2 RX | Samsung | imported from 3GU |
R4‑1816650 | Updated WF on 2 Rx vehicle UE: Link budget simulation assumptions | SAMSUNG, LG Electronics, Volkswagen AG | imported from 3GU |
R4‑1816651 | Conclusion of T-put results | Samsung | imported from 3GU |
R4‑1816652 | Conclusion of vehicle UE distinction methodology | LG Electronics Deutschland | imported from 3GU |
R4‑1816653 | Conclusion on Rx link budget evaluation | Volkswagen AG | imported from 3GU |
R4‑1816654 | Consideration on antenna measurements of vehicular antennas | Volkswagen AG | imported from 3GU |
R4‑1816655 | LS on NR ATF to include per branch relative phase UE measurement | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1816656 | TP on figure of merit in FR1 and FR2 static MIMO OTA | OPPO | imported from 3GU |
R4‑1816657 | Ad Hoc minutes on NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1816658 | Reply LS on wideband carrier operation for NR-U | Ericsson | imported from 3GU |
R4‑1816659 | TP to TR 38.889 V0.1.0 (2018-08): Conclusions from RAN4 on “Study on NR-based Access to Unlicensed Spectrum (Release 16)” | Ericsson | imported from 3GU |
R4‑1816660 | LS to RAN1 on TP to TR 38.889 from RAN4 | Ericsson | imported from 3GU |
R4‑1816661 | Further Reply LS on RAN4 design on channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816662 | Draft CR to 38.104 (5.3.4) RB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1816663 | Draft CR to 38.101-1 (5.3.4) RB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1816664 | Draft CR to 38.101-2 (5.3.4) RB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1816665 | WF on Channel spacing for intra-band continuous CA | Intel Corporation | imported from 3GU |
R4‑1816666 | Draft reply LS on NR V2X UE RF parameters | LG Electronics France | imported from 3GU |
R4‑1816667 | Response LS on Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipmentt | Ericsson | imported from 3GU |
R4‑1816668 | Draft CR to TS 38.104: Improvement of polarization description for OTA out-of-band blockling in sub-clause 10.6 | Ericsson | imported from 3GU |
R4‑1816669 | CR for 38.133 measurement in intra-F and inter-F in idle mode (4.2.2.2, 4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816670 | Correction of side condition in FR2 handover in section 6.1.1 | Ericsson | imported from 3GU |
R4‑1816671 | Correction of side condition in FR2 handover | Ericsson | imported from 3GU |
R4‑1816672 | WF on known cell condition for handover FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816673 | Correction on Trs in handover requirements (6.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816674 | DraftCR on maintaining UE timing requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1816675 | WF on SFTD measurement requirements | Ericsson | imported from 3GU |
R4‑1816676 | Draft CR 38.133 (9.1.2) Definition of measurement gap | Ericsson, ZTE | imported from 3GU |
R4‑1816677 | Draft CR to 38.133 on UE behaviour before and after measurement gap (section 9.1.2) | ZTE | imported from 3GU |
R4‑1816678 | WF on delay for TCI state switch and SCell activation with multiple TCI states | Qualcomm Incorporated | imported from 3GU |
R4‑1816679 | Test case for handover to FR1 NR cell (A.6.3.1) | Intel | imported from 3GU |
R4‑1816680 | CR to BFD requriements (section 8.5.2, 8.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1816681 | CR to Link Recovery Procedures section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816682 | CR to Link Recovery Procedures section 8.5.4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816683 | Remaining issues on L1-RSRP Computation for reporting | NTT DOCOMO, INC. | imported from 3GU |
R4‑1816684 | CR for L1-RSRP measurement accuracy (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1816685 | CR on PSCell addition delay in TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1816686 | CR on BWP switching requirement in TS38.133 (Section 8.6) | Intel Corporation | imported from 3GU |
R4‑1816687 | draftCR on BWP switching delay (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1816688 | CR on TS38.133 for interruption due to BWP switch (section 8.2.1.2.7 and 8.2.2.2.5) | MediaTek inc. | imported from 3GU |
R4‑1816689 | WF on RRC and MAC based BWP switching | Nokia,Nokia, Nokia Shanghai Bell, Mediatek Inc. | imported from 3GU |
R4‑1816690 | 2nd Adhoc minutes for NR BS demodulation performance | Huawei | imported from 3GU |
R4‑1816691 | TP for TS38.141-1 conductive requiremetns for PUCCH format 1 performance | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1816692 | TP to TS 38.101-4: Requirements applicability | Intel Corporation | imported from 3GU |
R4‑1816693 | TP for performance requirements for interworking (9) | Huawei, HiSilicon | imported from 3GU |
R4‑1816694 | TP to TS 38.101-4: FR1 PDSCH demodulation requirements (5.2) | Intel Corporation | imported from 3GU |
R4‑1816695 | Draft TP on FR2 PDSCH Demodulation Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816696 | TP to TS 38.101-4: FR1 SDR requirements (5.5) | Intel Corporation | imported from 3GU |
R4‑1816697 | TP for updating FR1 PDCCH requirements in TS 38.101-4 section 5.3 | Huawei, HiSilicon | imported from 3GU |
R4‑1816698 | TP to TS38.101-4 Section 7.3: PDCCH demodulation requirements | CATT | imported from 3GU |
R4‑1816699 | TP to TS 38.101-4: 5.4 FR1 PBCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816700 | TP to TS 38.101-4: 7.4 FR1 PBCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1816701 | TP of introduction of FR1 CQI requirement (6.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1816702 | TP to TS 38.101-4: FR2 CQI requirements (8.2) | Intel Corporation | imported from 3GU |
R4‑1816703 | Draft TP on FR1 Rank Indication Reporting Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816704 | Draft TP on FR2 Rank Indication Reporting Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1816705 | TP for TS 38.101-4 FR1 PMI test requirement | Samsung | imported from 3GU |
R4‑1816706 | TP to TS 38.101-4 FR2 PMI requirements | Samsung | imported from 3GU |
R4‑1816707 | Clarification on the applicability of side condition for CE UE R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1816708 | Correction to SSB Configurations for RRM Test Cases | Ericsson | imported from 3GU |
R4‑1816709 | Applicability Rules for UE support CA and EN-DC | Ericsson | imported from 3GU |
R4‑1816710 | CR for measurement report mapping table (section 10.1.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1816711 | Cell reselection to lower priority E-UTRAN test cases (section A.6.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1816712 | TP to TS 38.101-4: FR1 SDR requirements (5.5) | Intel Corporation | imported from 3GU |
R4‑1816713 | TP to TS38.101-4 Section 7.3: PDCCH demodulation requirements | CATT | imported from 3GU |
R4‑1816714 | TP for propagation conditions in TS 38.104-4(Annex B) | Huawei, HiSilicon | imported from 3GU |
R4‑1816715 | CR for L1-RSRP measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816716 | Draft CR to 38.810 Addition of Beam Peak direction search and Spherical Coverage | Rohde & Schwarz | imported from 3GU |
R4‑1816717 | Way forward on the range of Qrxlevmin and Qqualmin | Ericsson | imported from 3GU |
R4‑1816718 | DraftCR for updating 38.104 clause 8 about PUCCH formats 3 and 4 performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1816719 | TP for updating 38.141-1 clause 8 about PUCCH formats 3 and 4 conformance testing | Huawei, HiSilicon | imported from 3GU |
R4‑1816720 | TP for introduing PUCCH format 3 and 4 radiated conformance requirements for OTA test in 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1816721 | CR to TS 37.105 Removal of referencing error for in-band blocking | nn Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816722 | CR to TS 37.145-2 Removal of referencing error for in-band blocking | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816723 | AH minutes for NR BS conformance testing on Thu | Huawei | imported from 3GU |
R4‑1816724 | TP for TS38.141-1 base conformation test models (Section 4.9.2.2) | Huawei | imported from 3GU |
R4‑1816725 | TP to TS 38.141-1: 4.9.2.3 Data content of Physical channels and Signals for NR-FR1-TM | Nokia | imported from 3GU |
R4‑1816726 | TP to TS 38.141-2: FR2 test model(Section 4.9.2) | ZTE | imported from 3GU |
R4‑1816727 | TP to TS 38.141-2: Section 4.9.2.3 Data content for PHY channels | Ericsson | imported from 3GU |
R4‑1816728 | WF on synchronization design for TM2 | Ericsson | imported from 3GU |
R4‑1816729 | WF on filling remaining RBs of PDCCH symbols | Huawei | imported from 3GU |
R4‑1816730 | TP to TS38.141-1: total power dynamic range(Section 6.3.3) | ZTE | imported from 3GU |
R4‑1816731 | TP to TS 38.141-1: transmitted signal quality (Section 6.5) | ZTE Corporation | imported from 3GU |
R4‑1816732 | TP to TS 38.141-2: OTA transmitted signal quality (Section 6.6) | ZTE Corporation | imported from 3GU |
R4‑1816733 | Draft CR for 38.104 EVM requirement Section 6.5.2.3 and section 9.6.2.3 | Ericsson | imported from 3GU |
R4‑1816734 | (reserved) | UE RF session | imported from 3GU |
R4‑1816735 | TP to TS 38.141-2: Section 4.9.2.3 Data content for PHY channels | Ericsson | imported from 3GU |
R4‑1816736 | WF on filling remaining RBs of PDCCH symbols | Huawei | imported from 3GU |
R4‑1816737 | Draft CR to 38.104: Correction to FR2 OTA REFSENS requirement | Ericsson | imported from 3GU |
R4‑1816738 | WF for RX exclusion band extension of BS type 1-O | Ericsson | imported from 3GU |
R4‑1816739 | LS to ETSI WG EMC on 3GPP RAN4 progress on the EMC specification for OTA AAS BS | ZTE, Ericssson | imported from 3GU |
R4‑1816740 | TP to TS 38.141-2: Correction to FR2 OTA REFSENS requirement | Ericsson | imported from 3GU |
R4‑1816741 | Second NR test methods AH meeting mintues | Intel Corporation | imported from 3GU |
R4‑1816742 | WF on Test methods for FR2 RRM testing | Qualcomm | imported from 3GU |
R4‑1816743 | Draft CR on SNR and Noc feasibility for NR FR2 RRM testing | Rohde & Schwarz | imported from 3GU |
R4‑1816744 | LS on Measurement Grids | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1816745 | FR2 demod: Noc and Band groups update | ANRITSU LTD | imported from 3GU |
R4‑1816746 | LS on the temperature conditions for testing some FR2 requirements | Apple | imported from 3GU |
R4‑1816747 | LS on the beam correspondence requirement and multi-band applicability framework for FR2 power class 3 Ues | Apple | imported from 3GU |
R4‑1816748 | LS on the temperature conditions for testing some FR2 requirements | Apple | imported from 3GU |
R4‑1816749 | LS reply on NR-LTE Co-existence | Intel Corporation | imported from 3GU |
R4‑1816750 | ACS and IBB intra-band contiguous requirements for all BW Classes | Intel Corporation | imported from 3GU |
R4‑1816751 | Draft CR for RF exposure compliance in TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1816752 | Completion of configured maximum output power for intra-band contiguous EN-DC | Ericsson | imported from 3GU |
R4‑1816753 | Configured maximum output power for intra-band non-contiguous EN-DC | Ericsson | imported from 3GU |
R4‑1816754 | Miraculous way forward on Intra-band EN-DC MPR, A-MPR, and Pcmax | Qualcomm Incorporated, Nokia, Skyworks Solutions, T-Mobile USA | imported from 3GU |
R4‑1816755 | CR to 38.101-1: ACS and IBB intra-band contiguous CA | Intel Corporation | imported from 3GU |
R4‑1816756 | LS on FR2 MPE | OPPO | imported from 3GU |
R4‑1816757 | (reserved) | UE RF session | imported from 3GU |
R4‑1816758 | (reserved) | UE RF session | imported from 3GU |
R4‑1816759 | (reserved) | UE RF session | imported from 3GU |
R4‑1816760 | (reserved) | UE RF session | imported from 3GU |
R4‑1816761 | (reserved) | UE RF session | imported from 3GU |
R4‑1816762 | (reserved) | UE RF session | imported from 3GU |
R4‑1816763 | (reserved) | UE RF session | imported from 3GU |
R4‑1816764 | (reserved) | UE RF session | imported from 3GU |
R4‑1816765 | (reserved) | UE RF session | imported from 3GU |
R4‑1816766 | CR to Link Recovery Procedures section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816767 | Draft CR for 38.101-1 Mandatory UE channel bandwidths | Sprint | imported from 3GU |
R4‑1816768 | Updated reply LS on intra-band combination for NR-CA and MR-DC | Intel Corporation | imported from 3GU |
R4‑1816769 | TP to TR 38.889 V0.1.0 (2018-08): Conclusions from RAN4 on “Study on NR-based Access to Unlicensed Spectrum (Release 16)” | Ericsson | imported from 3GU |
R4‑1816770 | LS to RAN1 on TP to TR 38.889 from RAN4 | Ericsson | imported from 3GU |
R4‑1816771 | Updated WF on 2 Rx vehicle UE: Link budget simulation assumptions | SAMSUNG, LG Electronics, Volkswagen AG | imported from 3GU |
R4‑1816772 | TR 38.826 v0.2.0 update: 2Rx vehicle NR UE at FR1 | LG Electronics France | imported from 3GU |
R4‑1816773 | Conclusion on Rx link budget evaluation | Volkswagen AG | imported from 3GU |
R4‑1816774 | Reply LS to TSG RAN regarding LTE LAA channel combinations for 5GHz | Charter Communications, Inc | imported from 3GU |
R4‑1816775 | LS on conclusion of “Study on evaluation for 2 RX exception in Rel-15 vehicle mounted UE for NR” | Samsung | imported from 3GU |
R4‑1816776 | Draft Response LS on UE capability for SUL and SDL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816777 | Conclusion of vehicle UE distinction methodology | LG Electronics Deutschland | imported from 3GU |
R4‑1816778 | TR 38.826 v0.2.0 update: 2Rx vehicle NR UE at FR1 | LG Electronics France | imported from 3GU |
R4‑1816779 | Response LS on UE capability for SUL and SDL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1816780 | CR on NRSRP accuracy applicability for UE Category NB1 and NB2 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1816781 | CR to TS 36.101 – revision of OOB for B42 | Qualcomm Incorporated | imported from 3GU |
R4‑1816782 | CR for 36.101: PC2 UTRA ACLR exemption list update | Skyworks Solutions Inc. | imported from 3GU |
R4‑1816783 | CR to TS 37.105 - polarisation wording improvements for OTA s reference sensitivity | Huawei, Ericsson | imported from 3GU |
R4‑1816784 | CR to TS 37.145-2 - polarisation wording improvements for OTA reference sensitivity | Huawei, Ericsson | imported from 3GU |
R4‑1816785 | CR to TR 38.817-02 - polarisation wording improvements for OTA reference sensitivity | Huawei, Ericsson | imported from 3GU |
R4‑1816786 | CR: Addition of CQI tests for 8Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1816787 | Correction of references in CONNECTED mode requirements for category M1 | Ericsson | imported from 3GU |
R4‑1816788 | CR to TS 36.101 – Add RF requirements for CA 66C | Qualcomm Incorporated | imported from 3GU |
R4‑1816789 | Clarification on the applicability of side condition for CE UE R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1816790 | TR 38.826 v0.3.0 | LG Electronics France | imported from 3GU |
R4‑1816791 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1816792 | Addition of LTE B35 B36 B37 to out of band co-existence & co-location requirements with further change in 25.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1816793 | Reply LS on RAN4-RAN5 5G-NR RF pending issues | Intel Finland Oy | imported from 3GU |
page generated from database: 2024-07-20 12:15:34