3GPP TDocs (written contributions) at meeting
Meeting: R4-91 - 2019-05-13 to 2019-05-17, Reno, Nevada
meeting id: R4-91 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1905300 | Agenda for RAN4 #91 | RAN4 Chairman | imported from 3GU |
R4‑1905301 | RAN4 #90bis Meeting Report | ETSI MCC | imported from 3GU |
R4‑1905302 | LS on transient period for antenna switching or frequency hopping | RAN1, Qualcomm | imported from 3GU |
R4‑1905303 | LS on EPRE for WUS | RAN1, Qualcomm | imported from 3GU |
R4‑1905304 | LS on channel quality report in Msg3 for NB-IoT and LTE-M | RAN1, Huawei | imported from 3GU |
R4‑1905305 | Reply LS on NR mobility enhancements | RAN1, Intel Corporation | imported from 3GU |
R4‑1905306 | LS on clarification of OTA timing alignment for IAB | RAN1, Huawei | imported from 3GU |
R4‑1905307 | Reply LS on SL RLM / RLF in NR V2X for unicast | RAN1, InterDigital | imported from 3GU |
R4‑1905308 | Reply LS on collision of RRM measurement and UL transmission | RAN1, Huawei | imported from 3GU |
R4‑1905309 | LS on UL wideband operation for NR-U | RAN1, LG Electronics | imported from 3GU |
R4‑1905310 | Reply LS on clarification about CSI-RS measurement | RAN1, Intel Corporation | imported from 3GU |
R4‑1905311 | LS on transmit power measurement feasibility | RAN2, Ericsson | imported from 3GU |
R4‑1905312 | LS on non-anchor carrier CQI reporting in MSG3 | RAN2, Qualcomm | imported from 3GU |
R4‑1905313 | LS on non-anchor carrier idle mode measurements for RRM | RAN2, Qualcomm | imported from 3GU |
R4‑1905314 | LS to RAN1 and RAN4 on power saving | RAN2, Vivo | imported from 3GU |
R4‑1905315 | LS on SFTD measurement | RAN2, Huawei | imported from 3GU |
R4‑1905316 | LS to RAN1/4 on default values | RAN2, Nokia | imported from 3GU |
R4‑1905317 | LS on quality report in Msg3 for LTE-M | RAN2, Ericsson | imported from 3GU |
R4‑1905318 | LS on RAN4-RAN5 5G-NR RF pending issues after RAN5#5-5G-NR Adhoc | RAN5, NTT Docomo | imported from 3GU |
R4‑1905319 | Creation of new TSG sub group WLAN Antenna Performance (TSGWAP) | GSMA | imported from 3GU |
R4‑1905320 | Definition of BCS support in inter-band EN-DC mode | Qualcomm Incorporated | imported from 3GU |
R4‑1905321 | LS on EN-DC BCS handling | Qualcomm Incorporated | imported from 3GU |
R4‑1905322 | Summary of ideal and impairment results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1905323 | Test applicability for CA and high SNR in FR2 | China Telecom | imported from 3GU |
R4‑1905324 | Draft CR to TS 38.141-1: Update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1905325 | Draft CR to TS 38.141-2: Update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1905326 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1905327 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1905328 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1905329 | Draft CR to TS 38.104: Correction on the terminology in PUSCH FRC tables | China Telecom | imported from 3GU |
R4‑1905330 | Draft CR to TS 38.141-1: Correction on the terminology in PUSCH FRC tables | China Telecom | imported from 3GU |
R4‑1905331 | Draft CR to TS 38.141-2: Correction on the terminology in PUSCH FRC tables | China Telecom | imported from 3GU |
R4‑1905332 | Discussion on handover delay for LTE_feMob | China Telecom | imported from 3GU |
R4‑1905333 | Draft WID on NR performance requirement enhancement | China Telecom | imported from 3GU |
R4‑1905334 | Motivation for new WI on NR performance requirement enhancement | China Telecom | imported from 3GU |
R4‑1905335 | Way forward on NR demodulation scope for Rel-16 | China Telecom | imported from 3GU |
R4‑1905336 | n38 40 MHz A-MPR | Nokia | imported from 3GU |
R4‑1905337 | n7 new channel BW REFSENS | Nokia | imported from 3GU |
R4‑1905338 | BCS support in inter-band EN-DC mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905339 | removal of A-MPR brackets in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905340 | Introduction of band n48 into TS 38.101-1 | Nokia | imported from 3GU |
R4‑1905341 | Introduction of bands 87 and 88 into TS 36.101 | Nokia | imported from 3GU |
R4‑1905342 | Introduction of bands 87 and 88 into TS 36.124 | Nokia | imported from 3GU |
R4‑1905343 | Introduction of bands 87 and 88 into TS 25.101 | Nokia | imported from 3GU |
R4‑1905344 | PC2 operation on bands 31 and 72: REFSENS | Nokia | imported from 3GU |
R4‑1905345 | PC2 operation on bands 31 and 72: Emission simulations | Nokia | imported from 3GU |
R4‑1905346 | Release independence aspects of introduction of PC2 into bands 31 and 72 | Nokia | imported from 3GU |
R4‑1905347 | TP for TR 36.716-04-01 for CA_3-5-7-28 and CA_3-3-5-7-28 | Nokia, AMX | imported from 3GU |
R4‑1905348 | TP for TR 36.716-04-01 for CA_1-3-3-5-7 | Nokia, AMX | imported from 3GU |
R4‑1905349 | TP for TR 36.716-04-01 for CA_1-3-5-28 | Nokia, AMX | imported from 3GU |
R4‑1905350 | TP for TR 36.716-04-01 for CA_1-5-7-28 | Nokia, AMX | imported from 3GU |
R4‑1905351 | TP for TR 36.716-04-01 for CA_1-3-5-7-28 | Nokia, AMX | imported from 3GU |
R4‑1905352 | Addition of missing features for TS 38.307 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905353 | introduce 30MHz bandwidth of n41 into TS 38.101-1 | KDDI | imported from 3GU |
R4‑1905354 | n259 Band feasibility | Qualcomm Incorporated | imported from 3GU |
R4‑1905355 | FR2 ETC discussion continuation | Qualcomm Incorporated | imported from 3GU |
R4‑1905356 | Revised WID on Rel-16 NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1905357 | Draft CR on introducing NR intra-band CA of 3DL Bands and 1UL band | CATT | imported from 3GU |
R4‑1905358 | Further discussion on SCell activation requirement for the first SCell in FR2 band | CATT | imported from 3GU |
R4‑1905359 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1905360 | Further discussion on TCI state switching requirements | CATT | imported from 3GU |
R4‑1905361 | CR on TCI state switching delay | CATT | imported from 3GU |
R4‑1905362 | CR on interruption due to TCI state switching | CATT | imported from 3GU |
R4‑1905363 | CR on adding references to TS38.133 | CATT | imported from 3GU |
R4‑1905364 | CR on MRTD requirement for intra-band non-contiguous CA | CATT | imported from 3GU |
R4‑1905365 | CR on MTTD requirement for intra-band synchronous EN-DC | CATT | imported from 3GU |
R4‑1905366 | CR on timing advance adjustment delay | CATT | imported from 3GU |
R4‑1905367 | Discussion on V2X UE transmit timing requirement | CATT | imported from 3GU |
R4‑1905368 | WF on analysis of V2X RRM requirement | CATT | imported from 3GU |
R4‑1905369 | Updates to test cases for BWP switching in SA (section A.7.5.6.1) | CATT | imported from 3GU |
R4‑1905370 | Updates to test cases for interruptions at transitions in EN-DC (section A.4.5.2.1, A.4.5.2.2, A.5.5.2.1 and A.5.5.2.2) | CATT | imported from 3GU |
R4‑1905371 | Updates to test cases for interruption due to deactivated SCell operations in EN-DC (Section A.4.5.2 and A.5.5.2) | CATT | imported from 3GU |
R4‑1905372 | Update to test cases for SCell activation/deactivation in SA (section A.6.5.3 and A.7.5.3) | CATT | imported from 3GU |
R4‑1905373 | Draft CR to TS38.101-4: Environmental conditions (Annex E) | CATT | imported from 3GU |
R4‑1905374 | Discussion on general part of NR BS demodulation | CATT | imported from 3GU |
R4‑1905375 | Simulation results for NR BS demodulation | CATT | imported from 3GU |
R4‑1905376 | Simulation results for PRACH restricted set | CATT | imported from 3GU |
R4‑1905377 | Draft CR to TS38.104: Updates of PRACH performance requirements | CATT | imported from 3GU |
R4‑1905378 | Draft CR to TS38.141-1: Updates of PRACH performance requirements | CATT | imported from 3GU |
R4‑1905379 | Draft CR to TS38.141-2: Updates of PRACH performance requirements | CATT | imported from 3GU |
R4‑1905380 | Work plan for power saving WI | CATT | imported from 3GU |
R4‑1905381 | Discussion on RF aspects related to dynamic adaption for power saving | CATT | imported from 3GU |
R4‑1905382 | LS on UE power saving | CATT | imported from 3GU |
R4‑1905383 | Discussion on SAR requirement for EN-DC PC2 UE | CATT | imported from 3GU |
R4‑1905384 | Draft CR for introduction of SAR requirement for EN-DC PC2 UE | CATT | imported from 3GU |
R4‑1905385 | TP for TR37.825 for SAR requirements | CATT | imported from 3GU |
R4‑1905386 | Discussion on UE transient period capability report in NR | CATT | imported from 3GU |
R4‑1905387 | Discussion on NR V2X UE RF requirements | CATT | imported from 3GU |
R4‑1905388 | Discussion on Tx Diversity for TAE requirements | CATT | imported from 3GU |
R4‑1905389 | Draft CR for TS38.141-1: adding demodulation reference signals for PDSCH for TAE requirement | CATT | imported from 3GU |
R4‑1905390 | Draft CR for TS38.141-2: adding demodulation reference signals for PDSCH for TAE requirement | CATT | imported from 3GU |
R4‑1905391 | Draft CR for TS37.105: correction on TX Diversity and CRS for NR for TAE requirement | CATT | imported from 3GU |
R4‑1905392 | Draft CR for TS37.145-1: correction on TX Diversity and CRS for NR for TAE requirement | CATT | imported from 3GU |
R4‑1905393 | Draft CR for TS37.145-2: correction on TX Diversity and CRS for NR for TAE requirement | CATT | imported from 3GU |
R4‑1905394 | Draft CR for TS38.141-2: Correction on total EIRP measurement in the the test facility only supports single polarization | CATT | imported from 3GU |
R4‑1905395 | Discussion on NR DL 256QAM support for FR2 | CATT | imported from 3GU |
R4‑1905396 | TP for 37.716-11-11: MSD for inter-band EN DC_3A-n41A | CATT, CMCC | imported from 3GU |
R4‑1905397 | Draft CR on UE requirement for inter-ban EN-DC_3A-n41A | CATT, CMCC | imported from 3GU |
R4‑1905398 | TR 38.716-03-01 v0.0.2 | CATT | imported from 3GU |
R4‑1905399 | Template for Rel.16 NR inter-band carrier aggregation for 3 bands DL with 1 band UL | CATT, ZTE | imported from 3GU |
R4‑1905400 | TP for 38.716-03-01: UE requirements for CA_n3A-n41A-n79A | CATT | imported from 3GU |
R4‑1905401 | TP for 38.716-03-01: UE requirements for CA_n8A-n41A-n79A | CATT | imported from 3GU |
R4‑1905402 | Considerations on LTE/NR spectrum sharing in n41 | CATT | imported from 3GU |
R4‑1905403 | TR37.825 v0.1.0 High power UE (power class 2) for EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1905404 | Proposal on PC2 inter-band EN-DC (TDD+TDD) UE behaviour | CMCC | imported from 3GU |
R4‑1905405 | TP for TR37.825 for SAR requirement | CMCC | imported from 3GU |
R4‑1905406 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) | CMCC | imported from 3GU |
R4‑1905407 | Draft CR to TS 38.101-1 for CA_n3-n79 | CMCC | imported from 3GU |
R4‑1905408 | DraftCR to TR 38.817-02 Editorial Corrections | CMCC | imported from 3GU |
R4‑1905409 | Discussion on MU for FR2 OTA Tx transient period measurement | CMCC | imported from 3GU |
R4‑1905410 | DraftCR to TS 38.141-2 Editorial Corrections | CMCC | imported from 3GU |
R4‑1905411 | TR 37.716-00-00 v0.4.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1905412 | Correction to demodulation of PDCCH for LAA | ANRITSU LTD | imported from 3GU |
R4‑1905413 | TP for TR 38.716-01-01: CA_n48B and CA_n48C | Samsung | imported from 3GU |
R4‑1905414 | TP for TR 38.716-01-01: CA_n48(2A) | Samsung | imported from 3GU |
R4‑1905415 | Discussion on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1905416 | Reply LS on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1905417 | Corrections on EN-DC Reporting Criteria Requirement | Samsung | imported from 3GU |
R4‑1905418 | Correction CR to TS36.133 on capabilities for support of reporting criteria requirement for EN-DC | Samsung | imported from 3GU |
R4‑1905419 | Correction CR to TS36.133 on capabilities for support of reporting criteria requirement for EN-DC | Samsung | imported from 3GU |
R4‑1905420 | Further discussion on reporting criteria limitation in MR-DC | Samsung | imported from 3GU |
R4‑1905421 | Reply LS on reporting criteria limitation in MR-DC | Samsung | imported from 3GU |
R4‑1905422 | Draft CR for reporting criteria for NE-DC and NR-DC (9.1.4) | Samsung | imported from 3GU |
R4‑1905423 | Draft CR for NR-DC applicability rule (section 3.6.2.4) | Samsung | imported from 3GU |
R4‑1905424 | Further discussion on gap sharing for UE measurement in NE-DC | Samsung | imported from 3GU |
R4‑1905425 | Darft CR for Measurement Gap Sharing in NE-DC (Section 9.1.2, 9.1.5) | Samsung | imported from 3GU |
R4‑1905426 | Further discussion on gap sharing for UE measurement in NR-DC | Samsung | imported from 3GU |
R4‑1905427 | Darft CR for Measurement Gap Sharing in NR-DC (Section 9.1.2, 9.1.5) | Samsung | imported from 3GU |
R4‑1905428 | Further discussion on SAR solution for EN-DC HPUE | Samsung | imported from 3GU |
R4‑1905429 | Updated simulation results for NR PUSCH | Samsung | imported from 3GU |
R4‑1905430 | Discussion and simulation results for NR HST PUSCH | Samsung | imported from 3GU |
R4‑1905431 | Updated simulation results for NR UCI on PUSCH | Samsung | imported from 3GU |
R4‑1905432 | Summary of ideal and impairment results for UCI on PUSCH | Samsung | imported from 3GU |
R4‑1905433 | Updated simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1905434 | Discussion and simulation results for NR HST PRACH | Samsung | imported from 3GU |
R4‑1905435 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1905436 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1905437 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1905438 | Draft CR on NR UCI on PUSCH performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1905439 | Draft CR on NR UCI on PUSCH conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1905440 | Draft CR on NR UCI on PUSCH radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1905441 | Discussion and simulation results for BS performance with HST in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1905442 | Draft CR for TS38.101-1: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905443 | Draft CR for TS38.101-2: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905444 | Draft CR for TS38.101-3: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905445 | CR for TS37.105: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905446 | CR for TS37.145-1: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905447 | CR for TS37.145-2: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905448 | Draft CR for TS38.104: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905449 | Draft CR for TS38.141-1: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905450 | Draft CR for TS38.141-2: definition of synchronization operation | Samsung | imported from 3GU |
R4‑1905451 | Consideration on TS skeleton and terminology for IAB | Samsung | imported from 3GU |
R4‑1905452 | Discussion on Rel16 IAB scope | Samsung | imported from 3GU |
R4‑1905453 | Discussin on IAB co-existence study | Samsung | imported from 3GU |
R4‑1905454 | Further discussion on IAB RF requirements | Samsung | imported from 3GU |
R4‑1905455 | Simulation and views on beam correspondence tolerance requirement | Samsung | imported from 3GU |
R4‑1905456 | Draft CR to TS38.101-2 on beam correspondence | Samsung | imported from 3GU |
R4‑1905457 | Draft CR to TR38.810 on beam correspondence | Samsung | imported from 3GU |
R4‑1905458 | Framework of Rel-15 NR UE CSI requirements | Samsung | imported from 3GU |
R4‑1905459 | Simulation results for HST test cases | Samsung | imported from 3GU |
R4‑1905460 | Simulation results for additional TDD patterns | Samsung | imported from 3GU |
R4‑1905461 | Draft CR to TS38.101-4 on clear up of CSI requirements | Samsung | imported from 3GU |
R4‑1905462 | Draft CR to TS38.101-4 on adding FRC for sub-band CQI test cases | Samsung | imported from 3GU |
R4‑1905463 | Discussion on spectrum sharing among band 41/n41 | Samsung | imported from 3GU |
R4‑1905464 | CR to TS38.104 to introducing spectrum sharing on band n41 | Samsung | imported from 3GU |
R4‑1905465 | CR to TS38.101-1 to introducing spectrum sharing on band n41 | Samsung | imported from 3GU |
R4‑1905466 | Correction to demodulation of PDCCH for LAA | ANRITSU LTD | imported from 3GU |
R4‑1905467 | Correction to demodulation of PDCCH for LAA | ANRITSU LTD | imported from 3GU |
R4‑1905468 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1905469 | Introduction of completed SUL band combinations into Rel-16 TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1905470 | Introduction of completed SUL band combinations into Rel-16 TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1905471 | Protection of SUL band n89 to TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1905472 | Protection of SUL band n89 to TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1905473 | Protection of SUL bands to TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1905474 | Protection of SUL band n89 to TS 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1905475 | Protection of SUL band n89 to TS 36.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1905476 | Protection of SUL band n89 to TS 25.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1905477 | Protection of SUL band n89 to TS 25.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1905478 | Discussion on UL sharing applicability in different scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1905479 | Reply LS on UL sharing applicability in different scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1905480 | Channel arrangement for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1905481 | Spectrum utilization improvement in unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R4‑1905482 | Wideband operation at UE for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1905483 | Wideband operation at BS for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1905484 | Coexistence issue between sidelink and Uu interface in licensed spectrum | Huawei, HiSilicon | imported from 3GU |
R4‑1905485 | Discussion on the Tx DC location | Huawei, HiSilicon | imported from 3GU |
R4‑1905486 | LS on TX DC location | Huawei, HiSilicon | imported from 3GU |
R4‑1905487 | Correction to demodulation of PDCCH for LAA | ANRITSU LTD | imported from 3GU |
R4‑1905488 | Correction to event triggered reporting on Deactivated SCell | ANRITSU LTD | imported from 3GU |
R4‑1905489 | Correction to event triggered reporting on Deactivated SCell | ANRITSU LTD | imported from 3GU |
R4‑1905490 | Correction to event triggered reporting on Deactivated SCell | ANRITSU LTD | imported from 3GU |
R4‑1905491 | Correction to event triggered reporting on Deactivated SCell | ANRITSU LTD | imported from 3GU |
R4‑1905492 | Correction to timing advance adjustment accuracy test for Cat-M1 UE | ANRITSU LTD | imported from 3GU |
R4‑1905493 | Correction to timing advance adjustment accuracy test for Cat-M1 UE | ANRITSU LTD | imported from 3GU |
R4‑1905494 | Correction to timing advance adjustment accuracy test for Cat-M1 UE | ANRITSU LTD | imported from 3GU |
R4‑1905495 | Correction to timing advance adjustment accuracy test for Cat-M1 UE | ANRITSU LTD | imported from 3GU |
R4‑1905496 | CR to REL-16 TS 38.101-1: Implementation of endorsed draft CRs on NR combinations and dual Connectivity combinations | ETSI MCC | imported from 3GU |
R4‑1905497 | CR to REL-16 TS 38.101-2: Implementation of endorsed draft CRs on NR combinations and dual Connectivity combinations | ETSI MCC | imported from 3GU |
R4‑1905498 | CR to REL-16 TS 38.101-3: Implementation of endorsed draft CRs on NR combinations and dual Connectivity combinations | ETSI MCC | imported from 3GU |
R4‑1905499 | LTE-M PUR RSRP TA Validation Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R4‑1905500 | NB-IOT PUR RSRP TA Validation Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R4‑1905501 | Discussion on NR V2X UE RF requirements | vivo | imported from 3GU |
R4‑1905502 | Further discussion on maximum duty cycle for TDD EN-DC HPUE | vivo | imported from 3GU |
R4‑1905503 | Change description 4.2(d) in Applicability of minimum requirements for TS 38.101-1 | vivo | imported from 3GU |
R4‑1905504 | Change description 4.2(d) in Applicability of minimum requirements for TS 38.101-2 | vivo | imported from 3GU |
R4‑1905505 | On NR MIMO OTA Measurement Distance | vivo | imported from 3GU |
R4‑1905506 | Discussion on MSD requirements for UL harmonics | vivo | imported from 3GU |
R4‑1905507 | Correction of RefSens exceptions due to UL harmonic interference for NR CA in 38.101-1 | vivo | imported from 3GU |
R4‑1905508 | Correction of RefSens exceptions due to UL harmonic interference for EN-DC in 38.101-3 | vivo | imported from 3GU |
R4‑1905509 | WF on RefSens exceptions due to UL harmonic interference for SA CA and EN-DC | vivo | imported from 3GU |
R4‑1905510 | Discussion for UE transient period definition | vivo | imported from 3GU |
R4‑1905511 | Draft CR on PDSCH DL RMC | Qualcomm Incorporated | imported from 3GU |
R4‑1905512 | TP for TR 36.716-04-01: CA_2A-7A-29A-66A, CA_2A-7C-29A-66A, CA_2A-7A-7A-29A-66A | Huawei, HiSilicon | imported from 3GU |
R4‑1905513 | TP for TR 37.716-21-21 for DC_1_n77-n258 | Huawei, HiSilicon | imported from 3GU |
R4‑1905514 | TP for TR 37.716-21-21 for DC_1_n78-n258 | Huawei, HiSilicon | imported from 3GU |
R4‑1905515 | TP for TR 37.716-21-21 for DC_1_n79-n258 | Huawei, HiSilicon | imported from 3GU |
R4‑1905516 | TP for TR 37.716-21-21 for DC_3_n77-n258 | Huawei, HiSilicon | imported from 3GU |
R4‑1905517 | TP for TR 37.716-21-21 for DC_3_n78-n258 | Huawei, HiSilicon | imported from 3GU |
R4‑1905518 | TP for TR 37.716-21-21 for DC_3_n79-n258 | Huawei, HiSilicon | imported from 3GU |
R4‑1905519 | TP for TR 37.716-11-11: DC_1_n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1905520 | TP for TR 37.716-11-11: DC_3_n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1905521 | [CLI] TP for TR 38.828 to capture CLI co-existence simulation results | Huawei, HiSilicon | imported from 3GU |
R4‑1905522 | [CLI] Discusion on CLI co-existence simulation results for FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1905523 | [CLI] Discusion on CLI co-existence simulation results for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1905524 | [Rx]Draft CR for 38.101-1 Removing the brackets in Rx requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1905525 | [Rx] Discussion on NBB requirements for 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1905526 | [Rx]Draft CR for 38.101-1 defining NBB requirements<2.7GHz | Huawei, HiSilicon | imported from 3GU |
R4‑1905527 | [Rx]Draft CR for 38.101-3 defining Reference sensitivity for intra-band non-contiguous | Huawei, HiSilicon | imported from 3GU |
R4‑1905528 | [Anchor]Discussion on inter-band EN-DC reference sensitivity for anchor agnostic | Huawei, HiSilicon | imported from 3GU |
R4‑1905529 | [Rx]Draft CR for 38.101-1 modifying characteristics of the interfering signal in Annex D | Huawei, HiSilicon | imported from 3GU |
R4‑1905530 | Evaluation of switching and interruption time for UE antenna switching | vivo | imported from 3GU |
R4‑1905531 | [DRAFT]LS out on the switching and interruption time for UE dynamic adaptation to the maximum number of MIMO layers | vivo | imported from 3GU |
R4‑1905532 | Discussion on NR IAB deployment scenarios | CMCC | imported from 3GU |
R4‑1905533 | discussion on NR simulation | CMCC | imported from 3GU |
R4‑1905534 | CR to TS 37.113 subclause 4.5 | ZTE Corporation | imported from 3GU |
R4‑1905535 | CR to TS 37.114 subclause 4 | ZTE Corporation | imported from 3GU |
R4‑1905536 | draftCR to TS 38.141-2 OTA RX spurious emission (subclause 7.7) | ZTE Corporation | imported from 3GU |
R4‑1905537 | on 7-24GHz ancillary equipment RE | ZTE Corporation | imported from 3GU |
R4‑1905538 | on 7-24GHz OOB requirement | ZTE Corporation | imported from 3GU |
R4‑1905539 | on IAB EMC | ZTE Corporation | imported from 3GU |
R4‑1905540 | on NRTC for AAS EMC | ZTE Corporation | imported from 3GU |
R4‑1905541 | Draft CR to TS 38.113 (subclause 3.2,3.3,4.4.2) | ZTE Corporation | imported from 3GU |
R4‑1905542 | Draft CR to TS 38.113 (subclause 4.4.1) | ZTE Corporation | imported from 3GU |
R4‑1905543 | Draft CR to TS 38.113 (subclause 8.2.1) | ZTE Corporation | imported from 3GU |
R4‑1905544 | discussion on transmitter exclusion band for BS type 1-O | ZTE Corporation | imported from 3GU |
R4‑1905545 | further discussion on frequency range for RE test | ZTE Corporation | imported from 3GU |
R4‑1905546 | CR to TS 37.113 subclause 4.5 | ZTE Trunking Technology Corp. | imported from 3GU |
R4‑1905547 | LS on maximum allowed SCell activation delay for Rel16 CA | RAN1, Ericsson | imported from 3GU |
R4‑1905548 | LS on RAN1 NR UE features update | RAN1, NTT DOCOMO | imported from 3GU |
R4‑1905549 | Re-discussion on the FR2 duty cycle capability impact to RMC definition | OPPO | imported from 3GU |
R4‑1905550 | Draft CR on UL DL configurations considering maxUplinkdutycycle capability | OPPO | imported from 3GU |
R4‑1905551 | Clarification on the optionality of maxUplinkdutycycle capability | OPPO | imported from 3GU |
R4‑1905552 | LS on FR2 maxUplinkDutyCycle capability values | OPPO | imported from 3GU |
R4‑1905553 | Discussion on study of the FR2 extreme condition impact to peak EIRP and EIS | OPPO | imported from 3GU |
R4‑1905554 | LS on peak EIRP and peak EIS extreme temperature condition test | OPPO | imported from 3GU |
R4‑1905555 | Further discussion on NSA FDD-TDD HPUE SAR solutions | OPPO | imported from 3GU |
R4‑1905556 | Discussion on SUL HPUE SAR solutions | OPPO | imported from 3GU |
R4‑1905557 | TR 37.716-21-11 v0.5.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1905558 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1905559 | CR on introduction of completed EN-DC of 2 bands LTE and 1 band NR from RAN4#91 into TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1905560 | Draft CR to 38.104: BS TAE requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1905561 | Draft CR to 38.141-2: BS TAE requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1905562 | Correction on ?fOOB for 37.105 | Huawei, HiSilicon | imported from 3GU |
R4‑1905563 | Correction on ?fOOB for 37.145-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1905564 | Correction on ?fOOB for 37.145-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1905565 | Clarification on NB-IoT operation modes | Huawei, HiSilicon | imported from 3GU |
R4‑1905566 | TP for NB-IoT standalone operating | Huawei | imported from 3GU |
R4‑1905567 | NB-IoT operating in NR guard band | Huawei, HiSilicon | imported from 3GU |
R4‑1905568 | Discussion on power boosting | Huawei, HiSilicon | imported from 3GU |
R4‑1905569 | Draft CR for TS 38.104: Channel spacing for adjacent NR carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1905570 | A-MPR for n38 40 MHz co-existence | Huawei, HiSilicon | imported from 3GU |
R4‑1905571 | Options on MSR new capability sets | Huawei, HiSilicon | imported from 3GU |
R4‑1905572 | Test aspects for new MSR CS | Huawei, HiSilicon | imported from 3GU |
R4‑1905573 | Test configuration for new MSR CS | Huawei, HiSilicon | imported from 3GU |
R4‑1905574 | CR to 36.104: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1905575 | CR to 36.104: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1905576 | CR to 36.141: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1905577 | CR to 36.141: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1905578 | Discussions on the RRM requirements for NR-U scenario B | Huawei, HiSilicon | imported from 3GU |
R4‑1905579 | CR on NR-U scenario B spec structure in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1905580 | Initial discussions on the IAB RRM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1905581 | draftCR on event triggering and reporting criteria (section 9.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1905582 | Reply LS on reporting criteria limitation in MR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1905583 | revised Maintenance CR on event triggering and reporting criteria R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905584 | revised Maintenance CR on event triggering and reporting criteria R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905585 | draftCR on MO merging (section 9.1.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1905586 | draftCR to clarify in the requirements for RRC re-establishment (section 6.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905587 | maintenance draftCR on redirection requirements (section 6.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1905588 | maintenance CR on redirection requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905589 | maintenance CR on redirection requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905590 | Discussion on the remaining issues on BWP switch delay | Huawei, HiSilicon | imported from 3GU |
R4‑1905591 | draftCR on BWP switch delay (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1905592 | Reply LS on RRC processing delay for BWP switching | Huawei, HiSilicon | imported from 3GU |
R4‑1905593 | maintenance draftCR for interruptions due to BWP switch (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1905594 | CR for NE-DC interruptions due to BWP switch R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905595 | CR for NE-DC interruptions due to BWP switch R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905596 | draftCR on TCI state configurations for test cases (section A.3.16) | Huawei, HiSilicon | imported from 3GU |
R4‑1905597 | draftCR on modified parameters for RLM with 4Rx (section A.3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1905598 | draftCR on adding RMC for RLM scheduling restriction tests (section A.3.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905599 | maintenance draftCR on testing principle (A.3.13) | Huawei, HiSilicon | imported from 3GU |
R4‑1905600 | Maintenance draftCR on the intra-frequency cell search and measurement test cases for FR1 (section A.4.6.1 A.6.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905601 | Maintenance draftCR on the intra-frequency cell search and measurement test cases for FR2 (section A.5.6.1 A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905602 | Maintenance draftCR on idle mode test cases for FR2 (section A.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905603 | Maintenance draftCR on re-establishment test cases for FR1 (A.6.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905604 | Maintenance draftCR on re-establishment test cases for FR2 (A.7.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1905605 | Maintenance draftCR on RLM scheduling restriction test cases in FR2 (A.5.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1905606 | Test case for SA RLM scheduling restriction in FR2 (A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1905607 | Discussion on the preconfigured UL resource | Huawei, HiSilicon | imported from 3GU |
R4‑1905608 | Discussion on NRS presence on non-anchor carriers | Huawei, HiSilicon | imported from 3GU |
R4‑1905609 | reply LS on non-anchor carrier idle mode measurements for RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1905610 | Way forward on R16 enhancement for NB-IoT RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1905611 | CR on Cat NB2 UE test cases applicability R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1905612 | Maintenance on HD-FDD inter-frequency re-establishment test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1905613 | Maintenance on HD-FDD inter-frequency re-establishment test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1905614 | Maintenance on HD-FDD inter-frequency re-establishment test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905615 | Maintenance on HD-FDD inter-frequency re-establishment test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905616 | CR on TDD inter frequency idle RSTD accuracy test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905617 | CR on TDD inter frequency idle RSTD accuracy test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905618 | endorsed CR for serving cell RRM measurement relaxation test case R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905619 | endorsed CR for serving cell RRM measurement relaxation test case R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905620 | TP for TR38.716-02-00: 1UL and 2UL for CA_n8-n39 | ZTE Corporation, | imported from 3GU |
R4‑1905621 | Draft CR to TS 38.101-1 Rel16:_introducing CA_n39A-n41C and CA_n39A-n41(2A) with 1UL and 2UL | ZTE Corporation, | imported from 3GU |
R4‑1905622 | Draft CR to TS 38.101-3 Rel16_introducing DC_8A_n79C and DC_3C_n79A | ZTE Corporation, | imported from 3GU |
R4‑1905623 | TP for TR38.716-03-01:1 band UL for CA_40A-n41A-n79A | ZTE Corporation, | imported from 3GU |
R4‑1905624 | TP for TR38.716-03-02:2 bands UL for CA_40A-n41A-n79A | ZTE Corporation, | imported from 3GU |
R4‑1905625 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1905626 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1905627 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1905628 | Draft CR to TS38.101-3_Frequency error for intra-band for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1905629 | Draft CR to TS 38.101-3_removal of the reference sensitivity exception for NR CA between FR1 and FR2 | ZTE Corporation | imported from 3GU |
R4‑1905630 | Draft CR to TS38.101-1_introduction of n41C and corrections on Rx requirements for NR intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1905631 | Discussion on Rx requirements for NR intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1905632 | Discussion on UE demodulation for high speed scenario | CMCC | imported from 3GU |
R4‑1905633 | Discussion on HST enhancement for CA | CMCC | imported from 3GU |
R4‑1905634 | Discussion on HST enhancement for SCell measurement requirements | CMCC | imported from 3GU |
R4‑1905635 | Discussion on UE capability signaling for measurement gap pattern | CMCC | imported from 3GU |
R4‑1905636 | Draft CR on TS38.133 for Intrafrequency cell identification (section 9.2.5.1) | CMCC | imported from 3GU |
R4‑1905637 | Draft CR on TS38.133 for modified parameters for RLM testing with 4 RX antenna connection (section A.3.6.1) | CMCC | imported from 3GU |
R4‑1905638 | Motivation for NR support for High speed train scenario | CMCC | imported from 3GU |
R4‑1905639 | New WID on NR support for high speed train scenario | CMCC | imported from 3GU |
R4‑1905640 | revised Maintenance CR on event triggering and reporting criteria R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905641 | revised Maintenance CR on event triggering and reporting criteria R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905642 | Draft CR on UE requirement for inter-band CA_3A-n41A | CATT | imported from 3GU |
R4‑1905643 | Maintenance on TDD inter-frequency re-establishment test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905644 | Maintenance on TDD inter-frequency re-establishment test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1905645 | Draft CR for TR38.810 - Corrections to DFF Blocking Measurement Procedure | vivo | imported from 3GU |
R4‑1905646 | Optimized beam correspondence assessment using localized beam sweeping | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R4‑1905647 | Remove [ ] from EIS Spherical Coverage | ANRITSU LTD | imported from 3GU |
R4‑1905648 | Discussion on NR UE HARQ timing for new TDD patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1905649 | Discussion on test applicability for mandatory with capability features | Huawei, HiSilicon | imported from 3GU |
R4‑1905650 | Simulation results for NR PDSCH new demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1905651 | draftCR: Introduce single-tap HST channel model in TS 38.101-4 | Huawei, HiSilicon | imported from 3GU |
R4‑1905652 | draftCR: updates to FR1 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1905653 | draftCR: updates to FR2 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1905654 | draftCR: updates to FRC for demodulation performance | Huawei,HiSilicon,Ericsson | imported from 3GU |
R4‑1905655 | draftCR: updates to FR1 PDCCH | Huawei, HiSilicon | imported from 3GU |
R4‑1905656 | draftCR: updates to FR1 CQI reporting test cases in section 6.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1905657 | draftCR: updates to FR2 CQI reporting test cases in section 8.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1905658 | draftCR: addition of test applicability for mandatory with UE capability features | Huawei, HiSilicon | imported from 3GU |
R4‑1905659 | Simulation results for NR Rel-15 PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑1905660 | Discuss on HST demodulation requirements for Rel-15 NR BS | Huawei, HiSilicon | imported from 3GU |
R4‑1905661 | Discussion on NR BS performance test | Huawei, HiSilicon | imported from 3GU |
R4‑1905662 | draftCR: Updates to PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1905663 | draftCR: Updates to PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1905664 | draftCR: Updates to PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1905665 | Discussion and simulation for NR RI tests | Huawei, HiSilicon | imported from 3GU |
R4‑1905666 | Simulation results for NR FR1 PUCCH demodulation | Huawei, HiSilicon | imported from 3GU |
R4‑1905667 | Simulation results for NR FR2 PUCCH demodulation | Huawei, HiSilicon | imported from 3GU |
R4‑1905668 | Simulation results for NR PRACH demodulation | Huawei, HiSilicon | imported from 3GU |
R4‑1905669 | Discussion on Rel-15 FeNB-IoT NPRACH performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1905670 | CR: cleanup for LTE 8Rx DL (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1905671 | CR: cleanup for LTE 8Rx DL (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1905672 | CR on antenna configurations for NB-IoT demodualtion performance requirements (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑1905673 | CR on antenna configurations for NB-IoT demodualtion performance requirements (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑1905674 | Introduction of completed LTE CA for 2 bands DL with 2 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1905675 | TR 36.716-02-02 v0.4.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1905676 | Revised WID for LTE inter-band CA for 2 bands DL with 2 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1905677 | Further consideration on maximum aggregated bandwidth for NR CA | ZTE Corporation | imported from 3GU |
R4‑1905678 | Draft CR to TS 38.101-1 on maximum aggregated bandwidth for NR CA configurations | ZTE Corporation | imported from 3GU |
R4‑1905679 | Draft CR to TS 38.101-2 on configurations for intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1905680 | Draft CR to TS 38.101-1 on CA bandwidth class description | ZTE Corporation | imported from 3GU |
R4‑1905681 | Discussion on intra-band non-contiguous EN-DC notation | ZTE Corporation | imported from 3GU |
R4‑1905682 | Aspect of maxULDutycycle capability and how to conclude the work | Qualcomm Incorporated | imported from 3GU |
R4‑1905683 | LS on maxUplinkDutyCycle-FR2 parameters | Qualcomm Incorporated | imported from 3GU |
R4‑1905684 | draft CR of modification on reference for inter-band EN-DC including FR2 for TS 38.101-3 | NTT DOCOMO INC. | imported from 3GU |
R4‑1905685 | Draft CR to 38.101-2: FR2 Sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑1905686 | On FR2 REFSENS Assumptions | Qualcomm Incorporated | imported from 3GU |
R4‑1905687 | Draft CR to 38.101-2: FR2 MPR Wording CleanUp | Qualcomm Incorporated | imported from 3GU |
R4‑1905688 | On FR2 MPR for CA | Qualcomm Incorporated | imported from 3GU |
R4‑1905689 | Draft CR to 38.101-2: FR2 CA MPR enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1905690 | CR to 38.817-01: FR2 CA MPR explained | Qualcomm Incorporated | imported from 3GU |
R4‑1905691 | Draft CR to 38.101-2: FR2 CA REFESNS | Qualcomm Incorporated | imported from 3GU |
R4‑1905692 | Draft CR to 38.101-2: FR2 UE port clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1905693 | Draft CR to 38.101-1: FR1 UE port clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1905694 | FR2 RSRP Error during Beam Correspondence Test | Qualcomm Incorporated | imported from 3GU |
R4‑1905695 | Discussion on probe placement for FR1 MPAC | DOCOMO Communications Lab. | imported from 3GU |
R4‑1905696 | Draft CR for Multi-band relaxation to TS 38.101-2 | DOCOMO Communications Lab. | imported from 3GU |
R4‑1905697 | Remove [ ] from FR2 SS-RSRP Relative accuracy | ANRITSU LTD | imported from 3GU |
R4‑1905698 | Update on n41 30MHz configuration study | SoftBank Corp. | imported from 3GU |
R4‑1905699 | Summary of simulation results on 30MHz support in n41 | SoftBank Corp. | imported from 3GU |
R4‑1905700 | Inter-band NE-DC - specification requirements | InterDigital Communications | imported from 3GU |
R4‑1905701 | Inter-band NE-DC Pcmax definition - draft CR | InterDigital Communications | imported from 3GU |
R4‑1905702 | Inter-band NE-DC Configuration sub-clause - draft CR | InterDigital Communications | imported from 3GU |
R4‑1905703 | Inter-band NE-DC Transmitter part sub-clauses - draft CR | InterDigital Communications | imported from 3GU |
R4‑1905704 | Inter-band NE-DC Receiver part sub-clauses - draft CR | InterDigital Communications | imported from 3GU |
R4‑1905705 | Discussion on TCI State Switching Requirements | Intel Corporation | imported from 3GU |
R4‑1905706 | Draft CR to 38.133 on TCI State Switching Requirements (Section 8.10) | Intel Corporation | imported from 3GU |
R4‑1905707 | Discussion on Testcase parameters for Beam failure detection and Link recovery procedures | Intel Corporation | imported from 3GU |
R4‑1905708 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR1 for EN-DC (Section A.4.5.5) | Intel Corporation | imported from 3GU |
R4‑1905709 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR2 for EN-DC (Section A.5.5.5) | Intel Corporation | imported from 3GU |
R4‑1905710 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR1 for SA (Section A.6.5.5) | Intel Corporation | imported from 3GU |
R4‑1905711 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR2 for SA (Section A.7.5.5) | Intel Corporation | imported from 3GU |
R4‑1905712 | Draft CR to 38.101-4 on Applicability of requirements | Intel Corporation | imported from 3GU |
R4‑1905713 | Draft CR to 38.101-4 on Demodulation requirements for interworking | Intel Corporation | imported from 3GU |
R4‑1905714 | Draft CR to 38.101-4 on CSI requirements for interworking | Intel Corporation | imported from 3GU |
R4‑1905715 | Scope of Rel-16 NR RRM requirements for URLLC | Intel Corporation | imported from 3GU |
R4‑1905716 | Discussion on SFTD measurement | Intel Corporation | imported from 3GU |
R4‑1905717 | Reply LS on SFTD measurement | Intel Corporation | imported from 3GU |
R4‑1905718 | On UE timing adjustment under beam switching | Intel Corporation | imported from 3GU |
R4‑1905719 | CR on UE timing adjustment under beam switching (Section 7.1.2) | Intel Corporation | imported from 3GU |
R4‑1905720 | On the requirement for RRC based BWP switching | Intel Corporation | imported from 3GU |
R4‑1905721 | Reply LS on RRC based BWP switching | Intel Corporation | imported from 3GU |
R4‑1905722 | On SCell measurement requirement in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1905723 | On UE timing requirement in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1905724 | On radio link monitoring in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1905725 | Performance evaluation for measurement accuracy in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1905726 | AGC settling time for NR V2X | Intel Corporation | imported from 3GU |
R4‑1905727 | On transmit timing requirement for NR V2X | Intel Corporation | imported from 3GU |
R4‑1905728 | Scope of Rel-16 NR UE Demodulation/CSI requirements | Intel Corporation | imported from 3GU |
R4‑1905729 | NR FR2 RRM test methods: 1AoA Rough/Fine beams antenna gain difference | Intel Corporation | imported from 3GU |
R4‑1905730 | Draft CR to TR 38.810 on NR FR2 UE Demodulation test methods | Intel Corporation | imported from 3GU |
R4‑1905731 | Discussion on Noc and Es setup | Intel Corporation | imported from 3GU |
R4‑1905732 | NR PDSCH simulation results | Intel Corporation | imported from 3GU |
R4‑1905733 | Discussion on SDR requiremnets | Intel Corporation | imported from 3GU |
R4‑1905734 | Summary of NR PDSCH demodulation simulation results (FR1 FDD) | Intel Corporation | imported from 3GU |
R4‑1905735 | Summary of NR PDSCH demodulation simulation results (FR1 TDD) | Intel Corporation | imported from 3GU |
R4‑1905736 | Summary of SDR FR2 simulation results | Intel Corporation | imported from 3GU |
R4‑1905737 | Draft CR on FR1 normal PDSCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1905738 | Draft CR on EN-DC SDR requirements | Intel Corporation | imported from 3GU |
R4‑1905739 | Draft CR on SDR requirements for NR CA between FR1 and FR2 | Intel Corporation | imported from 3GU |
R4‑1905740 | Draft CR on TDD patterns | Intel Corporation | imported from 3GU |
R4‑1905741 | Draft CR on PDSCH FRC | Intel Corporation | imported from 3GU |
R4‑1905742 | Draft CR on Noc and Es setup | Intel Corporation | imported from 3GU |
R4‑1905743 | Simulation results of RSS for Rel-16 additional MTC enhancements for LTE | Intel Corporation | imported from 3GU |
R4‑1905744 | Discussion about RSRP measurement test method in FR2 | Intel Corporation | imported from 3GU |
R4‑1905745 | draftCR for E-UTRAN inter-RAT NR handover (section A.8.3) | Intel Corporation | imported from 3GU |
R4‑1905746 | On capability of measurement gap patterns | Intel Corporation | imported from 3GU |
R4‑1905747 | Reply LS on capability of measurement gap patterns | Intel Corporation | imported from 3GU |
R4‑1905748 | CR on capability of measurement gap patterns (section 9.1.2) for TS38.133 R15 | Intel Corporation | imported from 3GU |
R4‑1905749 | CR on capability of measurement gap patterns for TS36.133 R15 | Intel Corporation | imported from 3GU |
R4‑1905750 | CR on capability of measurement gap patterns for TS36.133 R16 | Intel Corporation | imported from 3GU |
R4‑1905751 | On MTTD and MRTD for intra-band contiguous EN-DC | Intel Corporation | imported from 3GU |
R4‑1905752 | Updated reply LS on intra-band combination for NR-CA and MR-DC | Intel Corporation | imported from 3GU |
R4‑1905753 | CR on MTTD and MRTD for intra-band EN-DC (section 7.5.3 & section 7.6.3) | Intel Corporation | imported from 3GU |
R4‑1905754 | Futher discussion on MRTD requirement for intra-band NCCA | Intel Corporation | imported from 3GU |
R4‑1905755 | CR on MRTD requirement for intra-band NCCA (section 7.6.4) | Intel Corporation | imported from 3GU |
R4‑1905756 | Motivation to introduce new SI of MG enh | Intel Corporation | imported from 3GU |
R4‑1905757 | New SI Proposal Study on measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑1905758 | On scope of non-BL UE in CE mode for R15 eFeMTC WI | Intel Corporation | imported from 3GU |
R4‑1905759 | CR on requirement applicability for non-BL CE UE for R15 | Intel Corporation | imported from 3GU |
R4‑1905760 | CR on requirement applicability for non-BL CE UE for R16 | Intel Corporation | imported from 3GU |
R4‑1905761 | Discussion on SCell activation delay in FR2 | Intel Corporation | imported from 3GU |
R4‑1905762 | Discussion on NR-U RRM | Intel Corporation | imported from 3GU |
R4‑1905763 | Discussion on TS38.133 specification structures for NR-U | Intel Corporation | imported from 3GU |
R4‑1905764 | draft CR to 38.101-2 UE maximum output power reduction for UL-MIMO | Intel Corporation | imported from 3GU |
R4‑1905765 | draft CR to 38.101-2 UE maximum output power for UL-MIMO | Intel Corporation | imported from 3GU |
R4‑1905766 | draft CR to 38.101-2 Correction to the table headers in configurations for CA | Intel Corporation | imported from 3GU |
R4‑1905767 | draft CR to 38.101-3 Correction ot DeltaTIB,c in configured output power for EN-DC | Intel Corporation | imported from 3GU |
R4‑1905768 | draft CR to 38.101-3 Configured output power for Inter-band NE-DC | Intel Corporation | imported from 3GU |
R4‑1905769 | on beam correspondence tolerance requirements | Intel Corporation | imported from 3GU |
R4‑1905770 | on FR2 Tx spurious emission | Intel Corporation | imported from 3GU |
R4‑1905771 | Draft CR to TS38.101-1 A-MPR for Inter-band CA | Intel Corporation | imported from 3GU |
R4‑1905772 | Draft CR to TS38.101-1 Almost contiguous MPR | Intel Corporation | imported from 3GU |
R4‑1905773 | Draft CR to TS38.101-3 Intra-band EN-DC A-MPR | Intel Corporation | imported from 3GU |
R4‑1905774 | Draft CR to TS38.101-3 Correction to intra-band and inter-band EN-DC Pcmax | Intel Corporation | imported from 3GU |
R4‑1905775 | Draft CR to TS38.101-2 Complete FR2 MPR/A-MPR | Intel Corporation | imported from 3GU |
R4‑1905776 | Views on NR FR2 256QAM requirements | Intel Corporation | imported from 3GU |
R4‑1905777 | CR to Rel-14 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1905778 | CR to Rel-15 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1905779 | CR to Rel-16 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1905780 | LTE HST performance evaluation - Bidirectional HST SFN scenario | Intel Corporation | imported from 3GU |
R4‑1905781 | Simulation results and discussion on NR CQI reporting | Intel Corporation | imported from 3GU |
R4‑1905782 | Simulation results and discussion on NR PMI reporting | Intel Corporation | imported from 3GU |
R4‑1905783 | Simulation results and discussion on NR RI reporting | Intel Corporation | imported from 3GU |
R4‑1905784 | Draft CR on NR CSI reporting | Intel Corporation | imported from 3GU |
R4‑1905785 | Discussion on the demodulation requirement of Rel.16 LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1905786 | Draft CR for TS 36.101: Support of CA_1-3-42-42 | SoftBank Corp. | imported from 3GU |
R4‑1905787 | TP for TR 37.716-21-21: EN-DC_1-8_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1905788 | Draft CR on FR1 CSI Reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1905789 | TP for TR 37.716-31-11: EN-DC_1-8-11_n77 | SoftBank Corp. | imported from 3GU |
R4‑1905790 | TP for TR 37.716-31-11: EN-DC_1-8-11_n78 | SoftBank Corp. | imported from 3GU |
R4‑1905791 | TP for TR 37.716-31-11: EN-DC_1-8-11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1905792 | TP for TR 38.716-02-00: CA_n28-n77 | SoftBank Corp. | imported from 3GU |
R4‑1905793 | CR for TS 38.101-3 (Rel-15): Support of n257D-F for DC_1-42_n257 and DC_3-42_n257 | SoftBank Corp. | imported from 3GU |
R4‑1905794 | Assumption on DC location under undetermined situation | Anritsu Corporation | imported from 3GU |
R4‑1905795 | Correction to a description of PRB for in-band emission in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1905796 | Correction to a description of PRB for in-band emission in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1905797 | Correction to power control in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1905798 | Correction to power control in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1905799 | Correction of LTE anchor condition to Spurious response for EN-DC | Anritsu Corporation | imported from 3GU |
R4‑1905800 | Discussion on Reselection criterion related to rangeToBestCell in Idle Mode | MediaTek inc. | imported from 3GU |
R4‑1905801 | draftCR on rangToBestCell in Idle Mode(section 4.2.2.3 and 4.2.2.4) | MediaTek inc. | imported from 3GU |
R4‑1905802 | draftCR on RRC connection release with redirection(section 6.2.3) | MediaTek inc. | imported from 3GU |
R4‑1905803 | Requirements for RRC connection release with redirection delay from LTE to NR | MediaTek inc. | imported from 3GU |
R4‑1905804 | Requirements for RRC connection release with redirection delay from LTE to NR | MediaTek inc. | imported from 3GU |
R4‑1905805 | draftCR on TS38.133 for BWP switch test case(section A.4.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1905806 | draftCR on TS38.133 for BWP switch test case(section A.5.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1905807 | draftCR on TS38.133 for BWP switch test case(section A.6.5.6.1.2) | MediaTek inc. | imported from 3GU |
R4‑1905808 | draftCR on TS38.133 for BWP switch test case(section A.7.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1905809 | Discussion on NR V2X RRM requirement scope | MediaTek inc. | imported from 3GU |
R4‑1905810 | draft CR of simple application for FR2 PC2 requirements with PC3 same requirements | LG Electronics Inc. | imported from 3GU |
R4‑1905811 | EIS for FR2 PC2 | LG Electronics Inc. | imported from 3GU |
R4‑1905812 | CR for extending HST-SFN tests to CA in Rel-16 | Ericsson | imported from 3GU |
R4‑1905813 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1905814 | Draft CR to TS 38.113 Addition NR to the scope | Ericsson | imported from 3GU |
R4‑1905815 | Draft CR to TS 38.113 Correction reference TR 38.817-2 | Ericsson | imported from 3GU |
R4‑1905816 | Draft CR to TS 38.113 Correction to Tables in BS test configurations | Ericsson | imported from 3GU |
R4‑1905817 | Draft CR to TS 38.113 Correction to text in section 6.1 Performance Criteria for continuous phenomena for BS | Ericsson | imported from 3GU |
R4‑1905818 | Draft CR to TS 38.113 Correction to text in section 6.2 Performance Criteria for transient phenomena for BS | Ericsson | imported from 3GU |
R4‑1905819 | Draft CR to TS 38.113 Modification to Note 2 in Section 4.4.2 | Ericsson | imported from 3GU |
R4‑1905820 | CR to 37.114 Subsections index in Section 4.1 | Ericsson | imported from 3GU |
R4‑1905821 | draft CR of loosening EIS for FR2 PC2 | LG Electronics Inc. | imported from 3GU |
R4‑1905822 | CR for extending HST-SFN tests to CA in Rel-16 | Ericsson | imported from 3GU |
R4‑1905823 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1905824 | Draft CR to TS 38.113 Addition NR to the scope | Ericsson | imported from 3GU |
R4‑1905825 | Draft CR to TS 38.113 Correction reference TR 38.817-2 | Ericsson | imported from 3GU |
R4‑1905826 | Draft CR to TS 38.113 Correction to Tables in BS test configurations | Ericsson | imported from 3GU |
R4‑1905827 | Draft CR to TS 38.113 Correction to text in section 6.1 Performance Criteria for continuous phenomena for BS | Ericsson | imported from 3GU |
R4‑1905828 | Draft CR to TS 38.113 Correction to text in section 6.2 Performance Criteria for transient phenomena for BS | Ericsson | imported from 3GU |
R4‑1905829 | Draft CR to TS 38.113 Modification to Note 2 in Section 4.4.2 | Ericsson | imported from 3GU |
R4‑1905830 | CR to 37.114 Subsections index in Section 4.1 | Ericsson | imported from 3GU |
R4‑1905831 | Antenna gain difference for PC2 1AoA | LG Electronics Inc. | imported from 3GU |
R4‑1905832 | CR for extending HST-SFN tests to CA in Rel-16 | Ericsson | imported from 3GU |
R4‑1905833 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1905834 | Discussion on EMC requirements for 7-24 GHz | Ericsson | imported from 3GU |
R4‑1905835 | Discussion on wanted signal level definition for EMC testing | Ericsson | imported from 3GU |
R4‑1905836 | CR to 37.114 Subsections index in Section 4.1 | Ericsson | imported from 3GU |
R4‑1905837 | draft CR of 2AoA pair for FR2 PC2(section A.3.15.3) | LG Electronics Inc. | imported from 3GU |
R4‑1905838 | draft CR of conditions for Y and Z for FR2 PC2 (section B.2) | LG Electronics Inc. | imported from 3GU |
R4‑1905839 | draft CR of Y and Z for FR2 power class 2(TR38.810) | LG Electronics Inc. | imported from 3GU |
R4‑1905840 | UE transmit timing Error for NR V2X | LG Electronics Inc. | imported from 3GU |
R4‑1905841 | Reply LS on NR V2X UE SL transmit timing Error | LG Electronics Inc. | imported from 3GU |
R4‑1905842 | Applicability of a set of UE RX beams in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1905843 | draft CR of introducing applicability of a set of UE RX beams in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1905844 | [NR-U] Possible guard band to enable concurrent operation in 5 GHz and 6 GHz spectrums | Skyworks Solutions Inc. | imported from 3GU |
R4‑1905845 | [NR-U] On NR-U Power Class, MPR and Channel Support | Skyworks Solutions Inc. | imported from 3GU |
R4‑1905846 | [7-24GHz] Applicable FR1 UE Technologies | Skyworks Solutions Inc. | imported from 3GU |
R4‑1905847 | Discussion on NR-U wide carrier operation | OPPO | imported from 3GU |
R4‑1905848 | Discussion on MTTD&MRTD for intra-band sync EN-DC | OPPO | imported from 3GU |
R4‑1905849 | DraftCR on MTTD requirements for intra-band sync EN-DC | OPPO | imported from 3GU |
R4‑1905850 | LS reply on reporting criteria limitation in MR-DC | OPPO | imported from 3GU |
R4‑1905851 | Discussion on capability of measurement gap patterns | OPPO | imported from 3GU |
R4‑1905852 | Draft CR on TS 38.141-1 Conducted test requirements for PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905853 | Draft CR on TS 38.141-2 Radiated test requirements for PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905854 | Draft CR on TS 38.104 Performance requirement for PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905855 | TR 38.716-02-00 v0.5.0 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905856 | Clarification on ULSUP FDM with single Tx | ZTE Wistron Telecom | imported from 3GU |
R4‑1905857 | Draft CR on SUL band combinations to TS 38.101-3 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905858 | Simulation results for multi-slot PUCCH | ZTE Wistron Telecom | imported from 3GU |
R4‑1905859 | Handling on BS performance requirements | ZTE Wistron Telecom | imported from 3GU |
R4‑1905860 | Draft CR on TS 38.104 Performance requirement for multi-slot PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905861 | Draft CR on TS 38.141-1 Conducted test requirements for multi-slot PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905862 | Draft CR on TS 38.141-2 Radiated test requirements for multi-slot PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1905863 | Updated simulation results for NR PUSCH | ZTE Wistron Telecom | imported from 3GU |
R4‑1905864 | [draft] LS on UE demodulation performance enhancement indicator for HST-SFN scenario | NTT DOCOMO, INC | imported from 3GU |
R4‑1905865 | UE capability and RRC signaling for enhanced RRM requirements in Rel.16 | NTT DOCOMO, INC | imported from 3GU |
R4‑1905866 | UE demodulation tests for single tap HST and multi-path with 500km/h velocity | NTT DOCOMO, INC | imported from 3GU |
R4‑1905867 | UE demodulation tests for carrier aggregation in HST-SFN scenario | NTT DOCOMO, INC | imported from 3GU |
R4‑1905868 | Default gap patterns for per-FR measurement gap in FR2 | NTT DOCOMO, INC | imported from 3GU |
R4‑1905869 | MRTD requirements for intra-band non-contiguous CA | NTT DOCOMO, INC | imported from 3GU |
R4‑1905870 | MRTD and MTTD requirements for intra-band synchronous EN-DC | NTT DOCOMO, INC | imported from 3GU |
R4‑1905871 | [draft] Correction CR on the reference cell for deriving the UE transmit timing | NTT DOCOMO, INC | imported from 3GU |
R4‑1905872 | WF on UE demodulation requirements for LTE HST in Rel.16 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1905873 | MRTD and MTTD requirements for intra-band synchronous EN-DC | Ericsson | imported from 3GU |
R4‑1905874 | Draft CR for TS 38.133: MRTD and MTTD for intra-band synchornous EN-DC | Ericsson | imported from 3GU |
R4‑1905875 | Incompatible NR TDD 3GPP specification due to new definition of UE TxRx switching times between cells | Ericsson | imported from 3GU |
R4‑1905876 | Draft CR for TS 38.133: Removal of UE transition times for intra-band CA and correct MRTD for intra-band NC CA | Ericsson | imported from 3GU |
R4‑1905877 | Correction to NR BS TAE for intra-band non-contiguous CA | Ericsson | imported from 3GU |
R4‑1905878 | Draft CR to TS 38.104: Correction to NR BS TAE for intra-band non-contiguous CA | Ericsson | imported from 3GU |
R4‑1905879 | UE RF tuning time for MIMO layer switching | Ericsson | imported from 3GU |
R4‑1905880 | LS to RAN1 and RAN2 on UE RF tuning time for MIMO layer switching | Ericsson | imported from 3GU |
R4‑1905881 | Way forward on BS TAE and MRTD specification for NR Rel-15 | Oy LM Ericsson AB | imported from 3GU |
R4‑1905882 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905883 | TP for TR 36.716-02-01 Introduction of CA_7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905884 | Draft CR to include 2 UL CA_2A-13A to CA_2A-2A-13A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905885 | Draft CR to include 2 UL CA_4A-7A to CA_4A-7C | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905886 | Draft CR to include 2 UL CA (band 5+66) for DL CA with 3 or 4 CCs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905887 | TP for TR 36.716-02-02 Introduction of CA_2-14 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905888 | TP for TR 36.716-02-02 Introduction of CA_4-28 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905889 | TP for TR 36.716-02-02 Introduction of CA_13-66 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905890 | TP for TR 36.716-02-02 Introduction of CA_14-30 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905891 | TP for TR 36.716-02-02 Introduction of CA_14-66 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905892 | Draft CR to 38.101-1 Narrow Band Blocking requirement | Intel Corporation | imported from 3GU |
R4‑1905893 | NBB for re-farming bands | Intel Corporation | imported from 3GU |
R4‑1905894 | Definition of nominal channel spacing for CA | Intel Corporation | imported from 3GU |
R4‑1905895 | Clarification on EN-DC notation | Intel Corporation | imported from 3GU |
R4‑1905896 | Discuss the TRP measurement annex in TS 38.141-2 | Huawei | imported from 3GU |
R4‑1905897 | CR to TR38.817-02 improvements to annex I | Huawei | imported from 3GU |
R4‑1905898 | CR to TR38.817-02 on TT and MU tables for FR2 OFF power | Huawei | imported from 3GU |
R4‑1905899 | draft CR to TS 38.141-2 - FR2 TX OFF update procedure and MU and TT tables. | Huawei | imported from 3GU |
R4‑1905900 | CR to TR37.843, correct references to annex E | Huawei | imported from 3GU |
R4‑1905901 | draft CR to TS 38.141-2 - corrections to test set up diagrams | Huawei | imported from 3GU |
R4‑1905902 | Discuss IAB link budget | Huawei | imported from 3GU |
R4‑1905903 | IAB discussion on FR2 co-existence simulation scenarios | Huawei | imported from 3GU |
R4‑1905904 | IAB FR2 co-existence scenarios | Huawei | imported from 3GU |
R4‑1905905 | IAB definitions | Huawei | imported from 3GU |
R4‑1905906 | IAB node antenna directional requirements | Huawei | imported from 3GU |
R4‑1905907 | Capturing the IAB background | Huawei | imported from 3GU |
R4‑1905908 | TP to TR 38.828 - clean up | Huawei | imported from 3GU |
R4‑1905909 | Discuss summary and recommendation of the CLI adjacent channel study | Huawei | imported from 3GU |
R4‑1905910 | TP to TR 38.828 - summary and recommendations | Huawei | imported from 3GU |
R4‑1905911 | 7-24GHz - BS types and classes and deployment scenarios | Huawei | imported from 3GU |
R4‑1905912 | 7-24GHz - FR1 and FR2 definitions | Huawei | imported from 3GU |
R4‑1905913 | 7 to 24GHz Discussion on hybrid AAS Conducted requirements | Huawei | imported from 3GU |
R4‑1905914 | TP to TR 38.820 – capturing BS classes | Huawei | imported from 3GU |
R4‑1905915 | LTE HST performance evaluation - Unidirectional HST SFN scenario | Intel Corporation | imported from 3GU |
R4‑1905916 | Applicability of RLM requirement considering colliding DL reception (section 8.1.3) | Intel Corporation | imported from 3GU |
R4‑1905917 | Applicability of BFD requirement considering colliding DL reception (section 8.5.3) | Intel Corporation | imported from 3GU |
R4‑1905918 | Applicability of L1-RSRP requirement considering colliding DL reception (section 9.5.4.2) | Intel Corporation | imported from 3GU |
R4‑1905919 | Further discussion on applicability of handover with simultaneous Tx/Rx | Intel Corporation | imported from 3GU |
R4‑1905920 | On applicability of RACH-less handover | Intel Corporation | imported from 3GU |
R4‑1905921 | RRM requirement for conditional handover | Intel Corporation | imported from 3GU |
R4‑1905922 | Way forward on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1905923 | draftCR on test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Intel Corporation | imported from 3GU |
R4‑1905924 | draftCR on test cases for inter-frequency measurement in SA with PCell in FR1 (section A.6.6.2) | Intel Corporation | imported from 3GU |
R4‑1905925 | draftCR on test cases for EN-DC FR1 timing advance adjustment accuracy (section A.4.4.3) | Intel Corporation | imported from 3GU |
R4‑1905926 | draftCR on test cases for SA FR1 timing advance adjustment accuracy (section A.6.4.3) | Intel Corporation | imported from 3GU |
R4‑1905927 | RRM requirement for enhanced handover | Intel Corporation | imported from 3GU |
R4‑1905928 | CR on RRM requirement for LTE handover enhancement | Intel Corporation | imported from 3GU |
R4‑1905929 | Further clarification on RAN4 UE feature list | DOCOMO Communications Lab. | imported from 3GU |
R4‑1905930 | Antenna Mask HPBW requirements update | ETS-Lindgren Europe | imported from 3GU |
R4‑1905931 | RRM Side Conditions in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1905932 | efeMTC simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905933 | CR introducing test cases for direct activation of Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905934 | CR introducing test cases for direct activation of Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905935 | SCell activation delay in FR2 and Known cell condition for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905936 | SCell activation delay in FR2 38.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905937 | PSCell addition delay in FR2 and Known cell condition for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905938 | PSCell addition delay in FR2 36.133 rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905939 | PSCell addition delay in FR2 36.133 rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905940 | PSCell addition delay in FR2 38.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905941 | TCI State Switching Delay Requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905942 | CR for TCI State Switching Delay Requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905943 | L1-RSRP measurement and reporting Corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905944 | Correction of UE requirements in section 9.5.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905945 | Correction to UE requirements in section 9.5.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905946 | CR including MAC trigger in aperiodic reporting (section 9.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905947 | Correction of incorrect RS abbreviation (section 9.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905948 | Correction of UE requirements in section 9.5.4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905949 | Finalization of Beam Failure Detection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905950 | Corrections to measurement restrictions and UE requirements in sections 8.5.3, 8.5.4, 8.5.5 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905951 | Scaling of CSI-RS based requirements in DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905952 | CR removing scaling of CSI-RS based requirements in DRX for FR2 in 8.1.3, 8.5.3 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905953 | Measurement Gap Pattern for FR2 measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905954 | Introduction of band n48 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905955 | Introduction of bands 87 and 88 into TS 36.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905956 | Introduction of bands 87 and 88 into TS 25.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905957 | Way Forward on FR2 RRM Side conditions for PC3 | Qualcomm Incorporated, KDDI, Verizon, T-Mobile US, Vodafone, AT&T, NTT Docomo, Ericsson, Nokia | imported from 3GU |
R4‑1905958 | Correction to demodulation of PDSCH 4Rx CA | ANRITSU LTD | imported from 3GU |
R4‑1905959 | Correction to demodulation of PDSCH 4Rx CA | ANRITSU LTD | imported from 3GU |
R4‑1905960 | Correction to demodulation of PDSCH 4Rx CA | ANRITSU LTD | imported from 3GU |
R4‑1905961 | Introduction of band n14 - CR to TS 38.101-1 | Ericsson, AT&T | imported from 3GU |
R4‑1905962 | Introduction of band n14 - CR to TS 38.133 | Ericsson, AT&T | imported from 3GU |
R4‑1905963 | Introduction of band n30 - CR to TS 38.133 | Ericsson, AT&T | imported from 3GU |
R4‑1905964 | Introduction of band n14 - CR to TS 38.104 | Ericsson | imported from 3GU |
R4‑1905965 | Introduction of band n14 - CR to TS 38.141-1 | Ericsson | imported from 3GU |
R4‑1905966 | Introduction of band n14 - CR to TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1905967 | Introduction of band n14 - CR to TS 36.104 | Ericsson | imported from 3GU |
R4‑1905968 | Introduction of band n14 - CR to TS 36.141 | Ericsson | imported from 3GU |
R4‑1905969 | Introduction of band n14 - CR to TS 37.104 | Ericsson | imported from 3GU |
R4‑1905970 | Introduction of band n14 - CR to TS 37.141 | Ericsson | imported from 3GU |
R4‑1905971 | Introduction of band n30 - CR to TS 38.104 | Ericsson | imported from 3GU |
R4‑1905972 | Introduction of band n30 - CR to TS 38.141-1 | Ericsson | imported from 3GU |
R4‑1905973 | Introduction of band n30 - CR to TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1905974 | Introduction of band n30: A-MPR simulations | Ericsson | imported from 3GU |
R4‑1905975 | Introduction of band n30 - CR to TS 38.101-1 | Ericsson | imported from 3GU |
R4‑1905976 | Introduction of band n30 - CR to TS 36.104 | Ericsson | imported from 3GU |
R4‑1905977 | Introduction of band n30 - CR to TS 36.141 | Ericsson | imported from 3GU |
R4‑1905978 | Introduction of band n30 - CR to TS 37.104 | Ericsson | imported from 3GU |
R4‑1905979 | Introduction of band n30 - CR to TS 37.141 | Ericsson | imported from 3GU |
R4‑1905980 | CR to TS 36.101 - NB-IoT REFSENS requirement being band agnostic | Ericsson | imported from 3GU |
R4‑1905981 | CR to TS 36.101 - NB-IoT REFSENS requirement being band agnostic | Ericsson | imported from 3GU |
R4‑1905982 | NB-IoT - NR coexistence : TP to TR - channel raster | Ericsson, ZTE | imported from 3GU |
R4‑1905983 | NB-IoT - NR coexistence : System scenarios considerations | Ericsson | imported from 3GU |
R4‑1905984 | NB-IoT - NR coexistence : TDD synchronization considerations | Ericsson | imported from 3GU |
R4‑1905985 | NB-IoT - NR coexistence : Testability considerations | Ericsson | imported from 3GU |
R4‑1905986 | NB-IoT - NR coexistence : Power boosting considerations | Ericsson | imported from 3GU |
R4‑1905987 | 29dBm UE - Blocking simulation results | Ericsson | imported from 3GU |
R4‑1905988 | BS demodulation simulations results | Ericsson | imported from 3GU |
R4‑1905989 | BS demodulation simulations results for UCI on PUSCH | Ericsson | imported from 3GU |
R4‑1905990 | Draft CR to TS 38.141-1 Manufacturer declaration for BS demodulation | Ericsson | imported from 3GU |
R4‑1905991 | Draft CR to TS 38.141-2 Manufacturer declaration for BS demodulation | Ericsson | imported from 3GU |
R4‑1905992 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1905993 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1905994 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1905995 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1905996 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1905997 | HST for NR BS demod in Rel-15 - PUSCH considerations | Ericsson | imported from 3GU |
R4‑1905998 | HST for NR BS demod in Rel-15 - PRACH considerations | Ericsson | imported from 3GU |
R4‑1905999 | BS demodulation - remaining open issues | Ericsson | imported from 3GU |
R4‑1906000 | Draft CR to TS 38.141-1 BS demodulation PRACH Missed detection error clarification | Ericsson | imported from 3GU |
R4‑1906001 | Draft CR to TS 38.141-2 BS demodulation PRACH Missed detection error clarification | Ericsson | imported from 3GU |
R4‑1906002 | Draft CR to 38.104: Subclause 6.7 and 9.8 transmitter intermodulation – correction of interfering signal type | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906003 | Draft CR to 38.141-1: 6.7 Transmitter intermodulation – correction of interfering signal type | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906004 | Draft CR to 38.141-2: 6.8 OTA transmitter intermodulation – correction of interfering signal type | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906005 | On “reference signal” in NR BS specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906006 | Draft CR to 38.104: Term “reference signal” replacing by term “reference waveform” in EVM context | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906007 | Draft CR to 38.141-1: Term “reference signal” replacing by term “reference waveform” in EVM context | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906008 | Draft CR to 38.141-2: Term “reference signal” replacing by term “reference waveform” in EVM context | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906009 | Draft CR to 38.141-1: corrections to test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906010 | Draft CR to 38.141-2: corrections to test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906011 | Channel bandwidths for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906012 | On NR-U channel raster and synchronization raster for 5GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906013 | Spectrum utilization for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906014 | System level simulation for 256QAM DL in FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906015 | Discussion on Annexes F in NR test specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906016 | Correction to demodulation of PDSCH LAA | ANRITSU LTD | imported from 3GU |
R4‑1906017 | Correction to demodulation of PDSCH LAA | ANRITSU LTD | imported from 3GU |
R4‑1906018 | Correction to demodulation of PDSCH LAA | ANRITSU LTD | imported from 3GU |
R4‑1906019 | Operating scenarios for IAB | AT&T | imported from 3GU |
R4‑1906020 | Co-existence scenarios for IAB | AT&T | imported from 3GU |
R4‑1906021 | IAB RF requirements | AT&T | imported from 3GU |
R4‑1906022 | IAB RRM requirements | AT&T | imported from 3GU |
R4‑1906023 | Correction to demodulation of PDSCH LAA | ANRITSU LTD | imported from 3GU |
R4‑1906024 | Draft CR on FR2 CSI Reporting tests | Qualcomm Incorporated | imported from 3GU |
R4‑1906025 | Inner and Outer Allocation Definition for Release 16 Intra-band Contiguous UL CCs | Skyworks Solutions Inc. | imported from 3GU |
R4‑1906026 | [NR-U] LBT wideband operation in UL | Skyworks Solutions Inc. | imported from 3GU |
R4‑1906027 | Draft CR on maxUplinkDutyCycle behavior | Qualcomm Incorporated | imported from 3GU |
R4‑1906028 | On ON-to-ON transient period | Intel Corporation | imported from 3GU |
R4‑1906029 | On NR-U Rasters | Intel Corporation | imported from 3GU |
R4‑1906030 | Reply LS on LTE anchor agnostic test | Intel Corporation | imported from 3GU |
R4‑1906031 | Corrections to idle mode CA measurement accuracy test | Qualcomm Incorporated | imported from 3GU |
R4‑1906032 | Corrections to idle mode CA measurement accuracy test | Qualcomm Incorporated | imported from 3GU |
R4‑1906033 | Clarification on WUS EPRE in requirements for WUS reception for UE category M1 | Qualcomm Incorporated | imported from 3GU |
R4‑1906034 | Clarification on WUS EPRE in requirements for WUS reception for UE category M1 | Qualcomm Incorporated | imported from 3GU |
R4‑1906035 | Discussion on SSB based BFD requirements | LG Electronics Inc. | imported from 3GU |
R4‑1906036 | Draft CR for L1-RSRP measurement restriction (9.5.5) | LG Electronics Inc. | imported from 3GU |
R4‑1906037 | NR PDSCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1906038 | Discussion on CLI measurement | LG Electronics Inc. | imported from 3GU |
R4‑1906039 | Discussion on SRS-RSRP measurement accuracy | LG Electronics Inc. | imported from 3GU |
R4‑1906040 | LS on clarification of UE capability for FDMed between PDSCH and CLI measurement resource | LG Electronics Inc. | imported from 3GU |
R4‑1906041 | Analysis of antenna gain difference with 1 AoA test setup for RRM performance test | LG Electronics Inc. | imported from 3GU |
R4‑1906042 | MSD test results for new x bands DL (x=3,4,5) with 2 bands UL CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1906043 | TP on correcting MSD of x bands (x=3,4,5) including Band 46 with 2 bands UL CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1906044 | TR 38.828 v0.1.0 Co-existence study of Cross-Link Interference (CLI) for NR | LG Electronics Finland | imported from 3GU |
R4‑1906045 | Co-existence simulation results of CLI for FR1 | LG Electronics Finland | imported from 3GU |
R4‑1906046 | Co-existence simulation results of CLI for FR2 | LG Electronics Finland | imported from 3GU |
R4‑1906047 | TP on simulation results and AnnexA_Detailed simulation results for non zero grid shift | LG Electronics Finland | imported from 3GU |
R4‑1906048 | TP on summary and recommendation of co-existence evaluation of CLI | LG Electronics Finland | imported from 3GU |
R4‑1906049 | TR 38.828 v0.2.0 Co-existence study of Cross-Link Interference (CLI) for NR | LG Electronics Finland | imported from 3GU |
R4‑1906050 | Updated simulation results for Beam correspondence requirement for PC3 | LG Electronics Finland | imported from 3GU |
R4‑1906051 | TR 36.716-03-02 v0.5.0 LTE-A x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1906052 | Revised WID on x bands (x=3,4,5) DL with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1906053 | Introducing CR on new x bands (x=3,4,5) DL with 2 bands UL inter-band CA in TS36.101 rel-16 | LG Electronics France | imported from 3GU |
R4‑1906054 | TR 37.716-21-21 v0.5.0 update: LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1906055 | Revised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1906056 | Introducing CR on new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1906057 | TP on summary of self-interference analysis for new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1906058 | Consideration on Uldutycycle default value for MPE regulations at FR2 | LG Electronics France | imported from 3GU |
R4‑1906059 | Draft LS on Uldutycycle default value for MPE reguratory requirements at FR2 | LG Electronics France | imported from 3GU |
R4‑1906060 | Draft CR on revised configured Tx power for MPE reguratory requirements in TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1906061 | TR38.886 v0.1.0 for 5G V2X with NR sidelink | LG Electronics France | imported from 3GU |
R4‑1906062 | Reply LS on NR V2X UE RF parameters for NR V2X service | LG Electronics France | imported from 3GU |
R4‑1906063 | TP on the operating scenarios for NR V2X Service | LG Electronics France | imported from 3GU |
R4‑1906064 | Initial coexistence scenarios and simulation assumptions | LG Electronics France | imported from 3GU |
R4‑1906065 | Down scope of NR V2X coexistence scenarios | LG Electronics France | imported from 3GU |
R4‑1906066 | Further consideration on LTE/NR spectrum sharing in Band41/n41 | CMCC | imported from 3GU |
R4‑1906067 | Updated PDCCH simulation and impairment results | CMCC | imported from 3GU |
R4‑1906068 | Updated summary results for alignment and impairments of NR PBCH demodulation tests in Rel-15 | CMCC | imported from 3GU |
R4‑1906069 | Draft CR on PBCH requirements | CMCC | imported from 3GU |
R4‑1906070 | Initial simulation results on NR HST | CMCC | imported from 3GU |
R4‑1906071 | Discussion on inter-frequency measurement without gap | CMCC | imported from 3GU |
R4‑1906072 | Draft CR for 38.133 on inter-frequency measurement without measurement gaps (section 9.3.1, 9.3.4, 9.3.5) | CMCC | imported from 3GU |
R4‑1906073 | Proposals for moving forward on BS types | Ericsson | imported from 3GU |
R4‑1906074 | TP to TR 38.820: Impact to BS requirements | Ericsson | imported from 3GU |
R4‑1906075 | On frequency ranges and FR extension | Ericsson | imported from 3GU |
R4‑1906076 | further elaboration on 7-24 GHz filtering | Ericsson | imported from 3GU |
R4‑1906077 | Updates to the eAAS specification to align to other specifications | Ericsson | imported from 3GU |
R4‑1906078 | Addition of power backoff for 256QAM and 1024QAM | Ericsson | imported from 3GU |
R4‑1906079 | Addition of power backoff for 256QAM and 1024QAM | Ericsson | imported from 3GU |
R4‑1906080 | Blocking requirement for MSR/NR operation | Ericsson | imported from 3GU |
R4‑1906081 | Blocking requirement for MSR/NR operation | Ericsson | imported from 3GU |
R4‑1906082 | Blocking requirement for MSR/NR operation | Ericsson | imported from 3GU |
R4‑1906083 | Correction to OTA Narrowband blocking requirement | Ericsson | imported from 3GU |
R4‑1906084 | Correction to out of band blocking requirement | Ericsson | imported from 3GU |
R4‑1906085 | Correction to out of band blocking requirement | Ericsson | imported from 3GU |
R4‑1906086 | Discussion on capability sets | Ericsson | imported from 3GU |
R4‑1906087 | Proposed new CS 18 and 19 | Ericsson | imported from 3GU |
R4‑1906088 | Test configurations supporting GSM/E-UTRA/NR and UTRA/E-UTRA/NR | Ericsson | imported from 3GU |
R4‑1906089 | Example CR to 37.141: New test configurations for GSM/UTRA/E-UTRA/NR testing | Ericsson | imported from 3GU |
R4‑1906090 | Draft CR to 37.104: Introduction of requirements for NR + UTRA/GSM combinations | Ericsson, Huawei, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1906091 | Draft CR to 37.141: Introduction of test requirements for NR + UTRA/GSM combinations | Ericsson | imported from 3GU |
R4‑1906092 | NR Narrowband blocking subcarrier positioning | Ericsson | imported from 3GU |
R4‑1906093 | Draft CR to 38.104: Clarification of interferer RB frequency for narrowband blocking | Ericsson | imported from 3GU |
R4‑1906094 | Draft CR to 38.141-1: Clarification of interferer RB frequency for narrowband blocking | Ericsson | imported from 3GU |
R4‑1906095 | Draft CR to 38.141-2: Clarification of interferer RB frequency for narrowband blocking | Ericsson | imported from 3GU |
R4‑1906096 | Draft CR to 38.104: Correction of frequency range for OTA spurious emissions | Ericsson | imported from 3GU |
R4‑1906097 | Simulation results for urban macro 4GHz | Ericsson | imported from 3GU |
R4‑1906098 | Simulation results for urban macro 30GHz | Ericsson | imported from 3GU |
R4‑1906099 | Simulation results for indoors 4GHz | Ericsson | imported from 3GU |
R4‑1906100 | Simulation results for indoors 30GHz | Ericsson | imported from 3GU |
R4‑1906101 | Simulation results for micro 30GHz | Ericsson | imported from 3GU |
R4‑1906102 | Further considerations on the micro scenario | Ericsson | imported from 3GU |
R4‑1906103 | Further considerations on UE-UE interference | Ericsson | imported from 3GU |
R4‑1906104 | TP to TR 38.828: Summary and recommendations | Ericsson | imported from 3GU |
R4‑1906105 | TP to TR 38.828: Addition of missing antenna configurations to simulation assumptions | Ericsson | imported from 3GU |
R4‑1906106 | TP for TR 38.716-03-01: CA_n1A-n3A-n78A with 1UL | China Telecom | imported from 3GU |
R4‑1906107 | TP for TR 38.716-03-02: CA_n1A-n3A-n78A with 2UL | China Telecom | imported from 3GU |
R4‑1906108 | Work plan on the WI: add support of NR DL 256QAM for FR2 | China Telecom | imported from 3GU |
R4‑1906109 | TR skeleton for TR 38.8xx: Study on support of NR downlink 256 Quadrature Amplitude Modulation (QAM) for frequency range 2 (FR2) | China Telecom | imported from 3GU |
R4‑1906110 | NR MIMO OTA Ad-hoc meeting notes | CAICT | imported from 3GU |
R4‑1906111 | WF on NR MIMO OTA | CAICT, Spirent, vivo, Apple, SGS | imported from 3GU |
R4‑1906112 | Further discussion on the Nominal channel spacing for CA | ZTE Corporation | imported from 3GU |
R4‑1906113 | Draft CR to TS 38.101-1: Nominal channel spacing for NR | ZTE Corporation | imported from 3GU |
R4‑1906114 | Draft CR to TS 38.101-2: Nominal channel spacing for NR | ZTE Corporation | imported from 3GU |
R4‑1906115 | Draft CR to TS 38.104: Nominal channel spacing for NR | ZTE Corporation | imported from 3GU |
R4‑1906116 | CR to TS37.104: Nominal channel spacing for NR for CA | ZTE Corporation | imported from 3GU |
R4‑1906117 | CR to TS37.141: Nominal channel spacing for NR for CA | ZTE Corporation | imported from 3GU |
R4‑1906118 | Discussion on multi-band test configurations | ZTE Corporation | imported from 3GU |
R4‑1906119 | CR to TS 37.145-2 Correction on multi-band test configurations | ZTE Corporation | imported from 3GU |
R4‑1906120 | Draft CR to TS 38.141-2 Correction on multi-band test configurations | ZTE Corporation | imported from 3GU |
R4‑1906121 | CR to TS37.104_New RAT combinations introduced to MSR | ZTE Corporation | imported from 3GU |
R4‑1906122 | Discussion on CS and TC for MSR new RAT combination | ZTE Corporation | imported from 3GU |
R4‑1906123 | Proposal on the template for Rel.16 NR DC/CA 3 bands DL with 2 band UL | ZTE Corporation | imported from 3GU |
R4‑1906124 | Revised WID for NR CA_DC 3 band DL with 2 band UL | ZTE Corporation | imported from 3GU |
R4‑1906125 | TP for TR 38.716-02-00 to include CA_n3A-n8A | ZTE Corporation | imported from 3GU |
R4‑1906126 | Revised WID for NR CA_DC 2 band DL with up to 2 band UL | ZTE Corporation | imported from 3GU |
R4‑1906127 | TR38.827 v1.0.0 NR MIMO OTA | CAICT | imported from 3GU |
R4‑1906128 | Discussion on timing requirement due to FR2 beam switching | Samsung R&D Institute UK | imported from 3GU |
R4‑1906129 | Discussion on timing requirement due to FR2 beam switching | Samsung R&D Institute UK | imported from 3GU |
R4‑1906130 | Discussion on timing requirement due to FR2 beam switching | Samsung R&D Institute UK | imported from 3GU |
R4‑1906131 | Discussion on timing requirement due to FR2 beam switching | Samsung R&D Institute UK | imported from 3GU |
R4‑1906132 | Discussion on timing requirement due to FR2 beam switching | Samsung R&D Institute UK | imported from 3GU |
R4‑1906133 | Discussion on cell reselection ranking criterion for rangeToBestCell and margin | Samsung | imported from 3GU |
R4‑1906134 | Draft CR to TS38.133 on correction of EN-DC UE tramsmit timing tests (Section A.4.4.1, A.5.4.1) | Samsung | imported from 3GU |
R4‑1906135 | Draft CR to TS38.133 on correction of SA UE tramsmit timing tests (Section A.6.4.1, A.7.4.1) | Samsung R&D Institute UK | imported from 3GU |
R4‑1906136 | Draft CR to TS38.133 on adding FR2 OTA test setup for random access test (Section A.5.3.2.2, A.7.3.2.2) | Samsung R&D Institute UK | imported from 3GU |
R4‑1906137 | On default value of maxUplinkDutyCycle | Samsung R&D Institute UK | imported from 3GU |
R4‑1906138 | LS on maxUplinkDutyCycle | Samsung R&D Institute UK | imported from 3GU |
R4‑1906139 | draft CR for TS 38.101-1 power class and configured transmit power | Huawei, HiSilicon | imported from 3GU |
R4‑1906140 | draft CR for TS 38.101-1 Rx requirement for CA | Huawei, HiSilicon | imported from 3GU |
R4‑1906141 | draft CR for TS 38.101-3 intra-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1906142 | draft CR for TS 38.101-1 on/off time mask | Huawei, HiSilicon | imported from 3GU |
R4‑1906143 | draft CR on TR 38.810 EIS test metric | Huawei, HiSilicon | imported from 3GU |
R4‑1906144 | on 3CC uplink configuration for EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1906145 | on beam correspondence | Huawei, HiSilicon | imported from 3GU |
R4‑1906146 | Maintenance for inter-RAT NR measurement requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906147 | Correction CR for inter-RAT NR measurement before EN-DC in 36.133 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906148 | Correction CR for inter-RAT NR measurement before EN-DC in 36.133 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906149 | Remaining issues on requirements for TCI state switching | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906150 | Clarification on QCL assumption for RRM requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906151 | [draft] Clarification CR on applicability for QCL assumption for RRM requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906152 | Draft CR for TS 38.101-1: Editorial improvement to EVM equalizer spectrum flatness requirements for Pi/2 BPSK | MediaTek Inc. | imported from 3GU |
R4‑1906153 | Draft CR for TS 38.101-1: Editorial corrections to intra-band contiguous CA ACS and in-band blocking requirements | MediaTek Inc. | imported from 3GU |
R4‑1906154 | Draft CR for TS 38.101-1: Adding symbol definitions for intra-band contiguous CA Rx maximum input level and ACS requirements | MediaTek Inc. | imported from 3GU |
R4‑1906155 | OBB issue for n77/n78/n79 pairing with low-band in CA/SUL/EN-DC | MediaTek Inc. | imported from 3GU |
R4‑1906156 | Draft CR for TS 38.101-1: Corrections to inter-band CA OBB additional exception requirement | MediaTek Inc. | imported from 3GU |
R4‑1906157 | Draft CR for TS 38.101-1: Corrections to SUL band combination OBB additional exception requirement | MediaTek Inc. | imported from 3GU |
R4‑1906158 | Draft CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | MediaTek Inc. | imported from 3GU |
R4‑1906159 | CR to TR 37.843: Addition of RC MU evaluation for spurious emission in subclause 10.5.2.3A.5.2 | Ericsson | imported from 3GU |
R4‑1906160 | CR to TR 37.843: Update of RC description in subclause 10.5.2.3A | Ericsson | imported from 3GU |
R4‑1906161 | TP to TR 38.820: Addition of PA trends in subclause 6.3.1 | Ericsson | imported from 3GU |
R4‑1906162 | On co-location scenarios and technical background for the frequency range 7 to 24 GHz | Ericsson | imported from 3GU |
R4‑1906163 | On EUT size considerations regarding BS OTA testing | Ericsson | imported from 3GU |
R4‑1906164 | TRP measurement of output power and emissions with a directional pattern in a reverberation chamber | Ericsson, NIST | imported from 3GU |
R4‑1906165 | CR to TR 38.817-02: Addition of MU evaluation for testing output power, ACLR and OBUE in RC test method in subclause 12.6 | Ericsson | imported from 3GU |
R4‑1906166 | Draft CR to TS 38.141-2: Addition of RC test method in test procedures for output power, ACLR and OBUE in subclause 6.3.4.2, 6.7.3.4.2 and 6.7.4.4.2 | Ericsson | imported from 3GU |
R4‑1906167 | Draft CR to TS 38.141-2: Editorial cleanup of OTA transmit ON/OFF power in subclause 6.5 | Ericsson | imported from 3GU |
R4‑1906168 | TP to TR 38.820: Addition of power scaling and AAS dependency approaches in sub-clause 6.3 | Ericsson | imported from 3GU |
R4‑1906169 | CR to TS 37.145-2: Addition of RC test method for spurious emissions in subclause 6.7.6 and 7.7.4 | Ericsson | imported from 3GU |
R4‑1906170 | CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2 | Ericsson | imported from 3GU |
R4‑1906171 | On TDD OFF power and carrier configuration aspects | Ericsson | imported from 3GU |
R4‑1906172 | TP to TR 38.820: Addition of NR terminology in clause 3 | Ericsson | imported from 3GU |
R4‑1906173 | TP to TR 38.820: Addition of example frequencies in subclause 6.2 | Ericsson | imported from 3GU |
R4‑1906174 | TP to TR 38.820: Addition of BS requirement sets in subclause 8.2 | Ericsson | imported from 3GU |
R4‑1906175 | TP to TR 38.820: Correction of TR structure in clause 8 | Ericsson | imported from 3GU |
R4‑1906176 | CR to TS 37.145-2: Clarification om beam identifier declaration in subclause 4.10 | Ericsson | imported from 3GU |
R4‑1906177 | Draft CR to TS 38.141-2: Clarification om beam identifier declaration in subclause 4.6 | Ericsson | imported from 3GU |
R4‑1906178 | On OTA out-of-band blocking requirement for the frequency region 7 to 24 GHz | Ericsson | imported from 3GU |
R4‑1906179 | CR to TR 37.843: Addition of MU evaluation for testing output power, ACLR and OBUE in RC test method in subclause 10.4 | Ericsson | imported from 3GU |
R4‑1906180 | Further elaboration on 7-24 GHz PA dependencies for different example frequencies | Ericsson | imported from 3GU |
R4‑1906181 | Draft CR to TS 38.141-2: Improving language on “narrowest beam” in subclause 6.2 and subclause 6.7 | Ericsson | imported from 3GU |
R4‑1906182 | Measurements in a reverberation chamber on devices with different directivities: chamber uniformity and total radiated power | Ericsson, RISE(SP Technical Research) | imported from 3GU |
R4‑1906183 | TP to TR 38.820: Addition of PA parameter dependency for different example frequencies in sublcause 6.3 | Ericsson | imported from 3GU |
R4‑1906184 | Elaboration on 7-24 GHz PA power scaling and AAS dependency | Ericsson | imported from 3GU |
R4‑1906185 | Further elaboration on 7-24 GHz phase noise for different example frequencies | Ericsson | imported from 3GU |
R4‑1906186 | CR to TS 37.145-2. Clarification of TRP methods applicability in Annex F | Ericsson | imported from 3GU |
R4‑1906187 | Draft CR to TS 38.141-2: Clarification of TRP methods applicability in Annex I | Ericsson | imported from 3GU |
R4‑1906188 | CR to TR 37.843: Removal of information in Annex A | Ericsson | imported from 3GU |
R4‑1906189 | FR2 absolute power tolerance | MediaTek Inc. | imported from 3GU |
R4‑1906190 | draft CR for DC_1A-3A-42D_n77, n78, n79 for TS 38.101-3.docx | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906191 | TP for DC_1-19-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906192 | TP for DC_1-19-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906193 | TP for DC_1-19_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906194 | TP for DC_1-19_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906195 | TP for DC_1-21-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906196 | TP for DC_1-21-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906197 | TP for DC_1-21_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906198 | TP for DC_1-21_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906199 | TP for DC_1-3-21_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906200 | TP for DC_1-3-21_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906201 | TP for DC_1-3-42_n257 for TR 37.716-31-11.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906202 | TP for DC_1-3_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906203 | TP for DC_1-3_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906204 | TP for DC_1-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906205 | TP for DC_1-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906206 | TP for DC_19-21-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906207 | TP for DC_19-21-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906208 | TP for DC_19-21_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906209 | TP for DC_19-21_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906210 | TP for DC_19-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906211 | TP for DC_19-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906212 | TP for DC_21-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906213 | TP for DC_21-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906214 | TP for DC_3-19_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906215 | TP for DC_3-19_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906216 | TP for DC_3-21_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906217 | TP for DC_3-21_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906218 | TP for DC_3-42_n77-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906219 | TP for DC_3-42_n78-n79 for TR 37.716-21-21.doc | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906220 | Updated TR 37.716-11-11_V0.4.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906221 | Big CR for agreed DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906222 | Revised WID on EN-DC for 2 bands DL with 2 bands UL (1 LTE band and 1 NR band) | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906223 | Draft CR for clarification of note for B42_n77 and B42_n78 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906224 | Handling of filter assumption of n77 and n78 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906225 | Draft CR for clarification of asynchronous operation for B42_n79 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906226 | Draft CR for clarification of asynchronous operation for n78_n79 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906227 | Draft CR for modification of MPR CA in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906228 | TP for CA_1A-3A-42D with 2UL CA for TR36.716-03-01 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906229 | Handling of LTE anchor agnostic | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906230 | RF requirements of n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906231 | Introduction of P-max in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906232 | draft CR for introducing P-max in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906233 | EIS for PC4 in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906234 | Reconsideration for PC4 REFSENS requirements | MediaTek Inc. | imported from 3GU |
R4‑1906235 | Draft CR for TS 38.101-2: To revise PC4 REFSENS and EIS spherical coverage requirements | MediaTek Inc. | imported from 3GU |
R4‑1906236 | Draft CR for TS 38.101-1: Corrections to configurations for intra-band non-contiguous CA | MediaTek Inc. | imported from 3GU |
R4‑1906237 | TP for TR 37.716-11-11: Self-interference analyses | MediaTek Inc. | imported from 3GU |
R4‑1906238 | Handover to known FR2 cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906239 | CR section 6.1.1.4, 6.1.1.5 Handover to known FR2 cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906240 | CR section 8.1.2.3, 8.1.3.3 Requirement for simultaneous SSB and CSI-RS RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906241 | On RRC-based BWP switch requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906242 | CR section 8.6.3 RRC-based BWP switch delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906243 | CR section 8.2 RRC-based BWP switch interruptions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906244 | Response LS on RRC processing delay for BWP switching | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906245 | CR section 8.2 Corrections on interruption requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906246 | CR section 3.6.2.4 Removing SUL from nbr of serving carriers for NR-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906247 | TC A.4.5.6.1.2+A.5.5.6.1.2 EN-DC DL active BWP switch with SCell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906248 | TC A.4.5.6.2.1 EN-DC FR1 DL active RRC-BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906249 | TC A.5.5.6.2.1 EN-DC FR2 DL active RRC-BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906250 | TC A.6.5.6.2.1 SA FR1 DL active RRC-BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906251 | TC A.7.5.6.2.1 SA FR2 DL active RRC-BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906252 | CR on threshold for FS3 RSSI and channel occupancy tests R13 | MediaTek inc. | imported from 3GU |
R4‑1906253 | CR on threshold for FS3 RSSI and channel occupancy tests R14 | MediaTek inc. | imported from 3GU |
R4‑1906254 | CR on threshold for FS3 RSSI and channel occupancy tests R15 | MediaTek inc. | imported from 3GU |
R4‑1906255 | CR on threshold for FS3 RSSI and channel occupancy tests R16 | MediaTek inc. | imported from 3GU |
R4‑1906256 | Measurement outside gap in FR2 for CCs with partially-overlapped SMTC occasions | MediaTek inc. | imported from 3GU |
R4‑1906257 | CR on measurement outside gap in FR2 with partially-overlapped SMTC (9.1.5) | MediaTek inc. | imported from 3GU |
R4‑1906258 | UE UL timing adjustment due to Rx beam change | MediaTek inc. | imported from 3GU |
R4‑1906259 | CR on timing change due to Rx beam change (7.1.2 and B.2.6) | MediaTek inc. | imported from 3GU |
R4‑1906260 | MRTD and MTTD of FR2 intra-band NCCA | MediaTek inc. | imported from 3GU |
R4‑1906261 | Remaining Issues on BWP Switch Delay | MediaTek inc. | imported from 3GU |
R4‑1906262 | CR on RRC based BWP switch delay (8.6) | MediaTek inc. | imported from 3GU |
R4‑1906263 | Gain difference between rough and fine Rx beams in FR2 RRM testing | MediaTek inc. | imported from 3GU |
R4‑1906264 | Remaining issues on FR2 RRM test method | MediaTek inc. | imported from 3GU |
R4‑1906265 | Correction to CA carrier spacing | Ericsson | imported from 3GU |
R4‑1906266 | Correction to CA carrier spacing | Ericsson | imported from 3GU |
R4‑1906267 | Correction to CA carrier spacing | Ericsson | imported from 3GU |
R4‑1906268 | On the carrier frequency mapping and UE channel bandwidth | Ericsson | imported from 3GU |
R4‑1906269 | Amendments to the channel raster to resouce grid mapping | Ericsson | imported from 3GU |
R4‑1906270 | Amendments to the channel raster to resouce grid mapping | Ericsson | imported from 3GU |
R4‑1906271 | Amendments to the channel raster to resouce grid mapping | Ericsson | imported from 3GU |
R4‑1906272 | Corrections to MPR/A-MPR and additional requirements for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1906273 | Increasing the configured EN-DC power for FDD-TDD PC3 | Ericsson | imported from 3GU |
R4‑1906274 | Amendment of the configured EN-DC power for FDD-TDD PC3 | Ericsson | imported from 3GU |
R4‑1906275 | Applicability of SA requirements for UE configured with EN-DC (Pcmax) | Ericsson | imported from 3GU |
R4‑1906276 | Introduction of P-Max for FR2 | Ericsson | imported from 3GU |
R4‑1906277 | Correction of power tolerances for configured output power | Ericsson | imported from 3GU |
R4‑1906278 | Amendment of the absolute power tolerance requirement | Ericsson | imported from 3GU |
R4‑1906279 | Amendment of the relative power tolerance requirement | Ericsson, Qualcomm Incorporated | imported from 3GU |
R4‑1906280 | Correction to Pcmax and Pumax for CA | Ericsson | imported from 3GU |
R4‑1906281 | On RF requirements for NR-U wideband operations | Ericsson | imported from 3GU |
R4‑1906282 | A new band supporting 100 kHz raster and 7.5 kHz UL shift for LTE/NR sharing in B41/Bn41 | Ericsson | imported from 3GU |
R4‑1906283 | Introduction of a new NR band for LTE/NR sharing in Band 41/n41 | Ericsson | imported from 3GU |
R4‑1906284 | Introduction of band combinations and requirements for Band n87 (LTE/NR sharing) | Ericsson | imported from 3GU |
R4‑1906285 | Introduction of a new NR band for LTE/NR sharing in Band 41/n41 | Ericsson | imported from 3GU |
R4‑1906286 | EN-DC power for FDD-TDD PC2 | Ericsson | imported from 3GU |
R4‑1906287 | On SCell activation delay | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906288 | On definition of known cell | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906289 | DM-RS configurations for normal demodulation test in FR1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906290 | Simulation results for normal PDSCH demodulation test of 2nd priority TDD configurations | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906291 | Simulation results for SDR test in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906292 | CR on reselection criterion in idle mode (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906293 | CR on reselection criterion in inter-RAT NR measurements (36.133-rel15) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906294 | CR on reselection criterion in inter-RAT NR measurements (36.133-rel16) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906295 | CR on MTTD in intra-band EN-DC (7.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906296 | Discussion on MRTD in intra-band NR NCCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906297 | CR on MRTD in intra-band NR NCCA (7.6.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906298 | TC EN-DC CSI-based RLM in FR1 (A.4.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906299 | TC EN-DC CSI-based RLM in FR2 (A.5.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906300 | TC scheduling restriction during SSB based BFD and LR in FR2 in EN-DC (A.5.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906301 | TC scheduling restriction during SSB based BFD and LR in FR2 in SA (A.7.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906302 | TC EN-DC SCell activation delay in FR1 (A.4.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906303 | TC EN-DC SCell activation delay in FR2 (A.5.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906304 | introduce 30MHz bandwidth of n41 into TS38.104 | KDDI | imported from 3GU |
R4‑1906305 | introduce n18 into TS38.101-1 | KDDI | imported from 3GU |
R4‑1906306 | introduce n18 into TS38.104 | KDDI | imported from 3GU |
R4‑1906307 | introduce n18 into TS38.133 | KDDI | imported from 3GU |
R4‑1906308 | introduce n18 into TS38.141-1 | KDDI | imported from 3GU |
R4‑1906309 | introduce n18 into TS38.307 | KDDI | imported from 3GU |
R4‑1906310 | NWI Addition of wider channel bandwidth in NR band n1 | Swisscom, Ericsson | imported from 3GU |
R4‑1906311 | Draft CR to 38.104: Correction on FRC (Annex A) | NEC | imported from 3GU |
R4‑1906312 | Draft CR to 38.141-1: Correction on FRC (Annex A) | NEC | imported from 3GU |
R4‑1906313 | Draft CR to 38.141-2: Correction on FRC (Annex A) | NEC | imported from 3GU |
R4‑1906314 | Draft CR to 38.141-2: Correction on OTA measurement setup (Annex E) | NEC | imported from 3GU |
R4‑1906315 | Draft CR to 38.141-2: Correction on procedure for general OTA transmitter spurious emissions requirements (6.7.5) | NEC | imported from 3GU |
R4‑1906316 | Draft CR to 38.141-2: Correction on OTA transmitter spurious emissions co-location requirements (6.7.5) | NEC | imported from 3GU |
R4‑1906317 | RRC based BWP Switching Delay | NEC | imported from 3GU |
R4‑1906318 | SCell Activation delay in FR2 band | NEC | imported from 3GU |
R4‑1906319 | Delay requirements for active TCI state switch | NEC | imported from 3GU |
R4‑1906320 | Draft CR to 38.133: RRC based BWP switch delay requirements | NEC | imported from 3GU |
R4‑1906321 | Draft CR to 38.133: TCI state switch delay requirements | NEC | imported from 3GU |
R4‑1906322 | Draft CR for removing squire brackets for ACS in above 3300 MHz for TS 38.101-1 | NTT DOCOMO INC. | imported from 3GU |
R4‑1906323 | CR to TS 38.104 Combined updates from RAN4 #90bis and RAN4#91 | Ericsson | imported from 3GU |
R4‑1906324 | Outcome of ECC SE21#105 on Category B spurious emissions in ERC Recommendation 74-01 | Ericsson, Nokia, Intel, Samsung | imported from 3GU |
R4‑1906325 | Status and time schedule of Category B spurious emissions in ECC, 3GPP and ETSI | Ericsson | imported from 3GU |
R4‑1906326 | Draft CR to TS 38.104 on Spurious emission Category B in FR2 | Ericsson, Samsung, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906327 | Draft CR to TS 38.141-2 on Spurious emission Category B in FR2 | Ericsson, Samsung, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906328 | Correction to EN-DC spurious emissions | ROHDE & SCHWARZ | imported from 3GU |
R4‑1906329 | TP for TR 37.716-21-21: UE requirements for DC_3-3_n78-n257, DC_3-3-7_n78-n257, DC_3-3-7-7_n78-n257 | CHTTL | imported from 3GU |
R4‑1906330 | Beam Correspondence, remaining requirement | Sony, Ericsson | imported from 3GU |
R4‑1906331 | TP for TR 37.716-31-11 UE requirements for DC_3-7-8_n78 | CHTTL | imported from 3GU |
R4‑1906332 | n65 introduction to 38.101-1 | Dish Network, HNS | imported from 3GU |
R4‑1906333 | n65 introduction to 38.104 | Dish Network, HNS | imported from 3GU |
R4‑1906334 | n65 introduction to 37.104 | Dish Network, HNS | imported from 3GU |
R4‑1906335 | n65 introduction to 38.133 | Dish Network, HNS | imported from 3GU |
R4‑1906336 | n65 introduction to 25.104 | Dish Network, HNS | imported from 3GU |
R4‑1906337 | n65 introduction to 25.141 | Dish Network, HNS | imported from 3GU |
R4‑1906338 | n65 introduction to 36.104 | Dish Network, HNS | imported from 3GU |
R4‑1906339 | n65 introduction to 36.141 | Dish Network, HNS | imported from 3GU |
R4‑1906340 | n65 introduction to 37.105 | Dish Network, HNS | imported from 3GU |
R4‑1906341 | n65 introduction to 37.141 | Dish Network, HNS | imported from 3GU |
R4‑1906342 | n65 introduction to 37.145-1 | Dish Network, HNS | imported from 3GU |
R4‑1906343 | n65 introduction to 37.145-2 | Dish Network, HNS | imported from 3GU |
R4‑1906344 | n65 introduction to 38.141-1 | Dish Network, HNS | imported from 3GU |
R4‑1906345 | n65 introduction to 38.141-2 | Dish Network, HNS | imported from 3GU |
R4‑1906346 | Removal of n65 in Rel-15 38.104 | Dish Network | imported from 3GU |
R4‑1906347 | Removal of n65 in Rel-15 38.133 | Dish Network | imported from 3GU |
R4‑1906348 | Correction to n66 and n70 band information | Dish Network | imported from 3GU |
R4‑1906349 | Correction to n66 and n70 band information | Dish Network | imported from 3GU |
R4‑1906350 | Correction to n66 and n70 band information | Dish Network | imported from 3GU |
R4‑1906351 | Correction to n66 and n70 band information | Dish Network | imported from 3GU |
R4‑1906352 | TP for TR 37.716-21-11: UE requirements for DC_3-7_n77 | CHTTL | imported from 3GU |
R4‑1906353 | CR for Applicability in intra-band FR2 | MediaTek inc. | imported from 3GU |
R4‑1906354 | Discussion on requirements for RLM in FR2 | MediaTek inc. | imported from 3GU |
R4‑1906355 | CR for CSI-RS based radio link monitoring | MediaTek inc. | imported from 3GU |
R4‑1906356 | Discussion on the first SCell activation in FR2 | MediaTek inc. | imported from 3GU |
R4‑1906357 | Discussion on TCI switching | MediaTek inc. | imported from 3GU |
R4‑1906358 | Discussion on requirements for BFD in FR2 | MediaTek inc. | imported from 3GU |
R4‑1906359 | Discussion on test cases for L1-RSRP in FR2 | MediaTek inc. | imported from 3GU |
R4‑1906360 | CR on RLM test cases for EN-DC FR1 (Section A.4.5.1) | MediaTek inc. | imported from 3GU |
R4‑1906361 | CR on RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1906362 | CR on RLM test cases for SA FR1 (Section A.6.5.1) | MediaTek inc. | imported from 3GU |
R4‑1906363 | CR on RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1906364 | NR PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906365 | NR PUCCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906366 | NR PRACH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906367 | NR UCI over PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906368 | NR Rel-15 HST evaluation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906369 | On NR BS demodulation remaining general issues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906370 | On NR PUSCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906371 | On NR multi-slot PUCCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906372 | On high speed train related PUSCH requirements for NR BS demodulation in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906373 | On high speed train related PRACH requirements for NR BS demodulation in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906374 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906375 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906376 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906377 | CR to correct MSD frequency of DC_1A-7A_n78A, DC_1A-18A-n79A for TR37.863-02-01 | MediaTek Inc. | imported from 3GU |
R4‑1906378 | on EIS metric for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1906379 | Draft CR to correct MSD frequency of DC_1A-7A_n78A, DC_1A-18A_n79A, DC_1A-41A_n79A, DC_3A-7A_n78A, DC_3C-7A_n78A, DC_3A-19A_n79 Table 7.3B.2.3.5.2-1 | MediaTek Inc. | imported from 3GU |
R4‑1906380 | on TDD-TDD PC2 EN-DC SAR | Huawei, HiSilicon | imported from 3GU |
R4‑1906381 | on nominal channel space for CA | Huawei, HiSilicon | imported from 3GU |
R4‑1906382 | Correction TP for TR37.716-11-11 for DC_1A_n5A | MediaTek Inc. | imported from 3GU |
R4‑1906383 | on UE transient period evaluation | Huawei, HiSilicon | imported from 3GU |
R4‑1906384 | draft CR for TS 38.101-1 MPR | Huawei, HiSilicon | imported from 3GU |
R4‑1906385 | Considerations on NB-IoT/NR Co-existence | Dish Network | imported from 3GU |
R4‑1906386 | Correction TP for TR37.716-11-11 for DC_66A_n25A | MediaTek Inc. | imported from 3GU |
R4‑1906387 | Considerations on 5G V2X with NR SL | Dish Network | imported from 3GU |
R4‑1906388 | TP for TR37.716-21-11 for DC_2A-13A_n66A | MediaTek Inc. | imported from 3GU |
R4‑1906389 | Discussion on SFTD accuracy requirements for NR DC | ZTE | imported from 3GU |
R4‑1906390 | Discussion on neighbour cell SFTD measurement | ZTE | imported from 3GU |
R4‑1906391 | Draft CR to 38.133 for SFTD accuracy requirements for NR DC (section 10.21.1.2) | ZTE | imported from 3GU |
R4‑1906392 | draft Reply LS on clarification of CSI-RS based RRM measurement | ZTE | imported from 3GU |
R4‑1906393 | On clarification of CSI-RS based RRM measurement | ZTE | imported from 3GU |
R4‑1906394 | Draft CR to 38.133 on correction of SFTD accuracy requirements for NE-DC (Section 10.1.21.1) | ZTE | imported from 3GU |
R4‑1906395 | draft Reply LS on neighbour cell SFTD measurement | ZTE | imported from 3GU |
R4‑1906396 | Draft CR to 38.133 on requirements for UE transition time for TDD Intra-band CA (section 7.8) | ZTE | imported from 3GU |
R4‑1906397 | Further discussion on MRTD for non-contiguous CA | ZTE | imported from 3GU |
R4‑1906398 | CR to 36.133 on SFTD accuracy | ZTE | imported from 3GU |
R4‑1906399 | Draft CR to TS 38.141-2 improvements to annex I | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R4‑1906400 | Side Conditions for L1-RSRP measurements | ANRITSU LTD | imported from 3GU |
R4‑1906401 | New WID on NR RRM requirements enhancement | ZTE | imported from 3GU |
R4‑1906402 | Motivation on NR RRM requirements enhancement | ZTE | imported from 3GU |
R4‑1906403 | CR to 36.133 on SFTD accuracy | ZTE Corporation | imported from 3GU |
R4‑1906404 | draft CR for reporting criteria in TS 38.133(section 9.1.4.2) | OPPO | imported from 3GU |
R4‑1906405 | Summary of PUSCH simulation results for eFeMTC | Ericsson | imported from 3GU |
R4‑1906406 | Correction of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1906407 | Correction of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1906408 | Correction of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1906409 | Correction of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1906410 | Discussion on channel quality reporting for NB-IoT | Ericsson | imported from 3GU |
R4‑1906411 | Discussion on channel quality reporting for eMTC | Ericsson | imported from 3GU |
R4‑1906412 | RLM for HST | Ericsson | imported from 3GU |
R4‑1906413 | Radio link monitoring requirements under HST | Ericsson | imported from 3GU |
R4‑1906414 | CR 38.133 (10.1.20) L1-RSRP accuracy requirements for FR2 | Ericsson | imported from 3GU |
R4‑1906415 | CR 38.133 (9.5.3) Correction of L1-RSRP measurement report requirements | Ericsson | imported from 3GU |
R4‑1906416 | Discussion for RMC/OCNG/SSB for 2AoA setup | Ericsson | imported from 3GU |
R4‑1906417 | CR 38.133 (A.3.1) RMC for 2AoA setup | Ericsson | imported from 3GU |
R4‑1906418 | CR 38.133 (A.3.2) OCNG for 2AoA setup | Ericsson | imported from 3GU |
R4‑1906419 | CR 38.133 (A.3.10) SSB for 2AoA setup | Ericsson | imported from 3GU |
R4‑1906420 | Discussion on filter adaptation if PRBs are scheduled in guardbands for NR-U LBT sub-bands | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906421 | Discussion on regulatory requirements for in-carrier leakage in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906422 | draft LS on UL wideband operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906423 | EN-DC 4 LTE bands + 1NR band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906424 | Revised WID of EN-DC 4LTE+1NR band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906425 | TP for TR 37.716-21-11 MSD table for DC_30A-66A-66A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906426 | TP for TR 37.716-21-11 MSD value for DC_2A-66A_n5A | Nokia, MediaTek | imported from 3GU |
R4‑1906427 | Support for autonomous gap ANR (towards 2G/3G/4G neighbour cells) configured by LTE / MN in EN-DC | Ericsson | imported from 3GU |
R4‑1906428 | Reply LS on autonomous gap for NR ANR | Ericsson | imported from 3GU |
R4‑1906429 | Mandatory measurement gap patterns in SA and NSA NR | Ericsson | imported from 3GU |
R4‑1906430 | Reply LS on capability of measurement gap patterns | Ericsson | imported from 3GU |
R4‑1906431 | Correction of measurement gap patterns in 38.133 section 9.1.2 | Ericsson | imported from 3GU |
R4‑1906432 | Correction of measurement gap patterns in 36.133 | Ericsson | imported from 3GU |
R4‑1906433 | Correction of measurement gap patterns in 36.133 | Ericsson | imported from 3GU |
R4‑1906434 | Known cell definition in handover | Ericsson | imported from 3GU |
R4‑1906435 | Test case updates for FR1 intrafrequency RSRP accuracy in EN-DC, section A.4.7.1.1 | Ericsson | imported from 3GU |
R4‑1906436 | Test case updates for FR1 intrafrequency RSRP accuracy in SA, section A.4.6.1.1 | Ericsson | imported from 3GU |
R4‑1906437 | Test case updates for FR2 intrafrequency RSRP accuracy in EN-DC, section A.5.7.1.1 | Ericsson | imported from 3GU |
R4‑1906438 | Test case updates for FR2 intrafrequency RSRP accuracy in SA, section A.4.7.1.1 | Ericsson | imported from 3GU |
R4‑1906439 | Considerations on some remaining open issues in FR2 OTA testing | Ericsson | imported from 3GU |
R4‑1906440 | Further details of RRM ideal RSRP in testing | Ericsson | imported from 3GU |
R4‑1906441 | Correction of test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Ericsson | imported from 3GU |
R4‑1906442 | Correction of test cases for inter-frequency measurement in SA in FR1 (section A.6.6.2) | Ericsson | imported from 3GU |
R4‑1906443 | Requirements analysis for RRM idle mode / PCell requirements supporting enhanced high speed operation | Ericsson | imported from 3GU |
R4‑1906444 | Deactivated Scell requirements at 350 and 500 km/h | Ericsson | imported from 3GU |
R4‑1906445 | Configuration and capability for high speed feature | Ericsson | imported from 3GU |
R4‑1906446 | LS on configuration and capability for high speed feature | Ericsson | imported from 3GU |
R4‑1906447 | Measurement requirements for LTE further high speed enhancements | Ericsson | imported from 3GU |
R4‑1906448 | Gap sharing between intra- and inter-frequency for NR-DC and NE-DC | Ericsson | imported from 3GU |
R4‑1906449 | Gap sharing for NE-DC in section 9.1.2.1b | Ericsson | imported from 3GU |
R4‑1906450 | Gap sharing for NR-DC in section 9.1.2.1a and 9.1.2.1c | Ericsson | imported from 3GU |
R4‑1906451 | Test case list for NR-DC and NE-DC | Ericsson | imported from 3GU |
R4‑1906452 | Specification structure for NR-U | Ericsson | imported from 3GU |
R4‑1906453 | Agreements on specification structure for NR-U RRM in 38.133 and 36.133 | Ericsson | imported from 3GU |
R4‑1906454 | Overview of requirements for NR-U scenario B | Ericsson | imported from 3GU |
R4‑1906455 | Overview of necessary requirement for LTE mobility enhancements for LTE even further mobility enhancement | Ericsson | imported from 3GU |
R4‑1906456 | Non-zero/non equal TA for RACH-less HO for NR mobility enhancement | Ericsson | imported from 3GU |
R4‑1906457 | RACH-less handover for NR mobility enhancement | Ericsson | imported from 3GU |
R4‑1906458 | Considerations on RAN4 requirements for NR mobility enhancement | Ericsson | imported from 3GU |
R4‑1906459 | Removal of square brackets in 38.133 intrafrequency measurement procedures section 9.2.5.1 | Ericsson | imported from 3GU |
R4‑1906460 | Removal of square brackets in 38.133 interfrequency measurement procedures section 9.3.4, 9.3.5 | Ericsson | imported from 3GU |
R4‑1906461 | TP for TR 37.716-11-11: further clarification of MSD requirements for DC_3_n3 | CHTTL, Skyworks, Mediatek | imported from 3GU |
R4‑1906462 | TP for TR 36.716-02-02: adding CA_1-7-7 BCS1 | CHTTL | imported from 3GU |
R4‑1906463 | NR PDSCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1906464 | LTE PDSCH simulation for HST enhancement | MediaTek inc. | imported from 3GU |
R4‑1906465 | On AGC settling time | MediaTek inc. | imported from 3GU |
R4‑1906466 | Draft CR to TS38.101-4: Correction to FR1 CSI test cases | MediaTek inc. | imported from 3GU |
R4‑1906467 | TP for TR 36.716-03-02: CA_1-3-3-7 and CA_1-3-3-7-7 xDL/2UL combinations | CHTTL | imported from 3GU |
R4‑1906468 | Draft new Work Item Description for NR Repeater | Andrew Wireless Systems GmbH | imported from 3GU |
R4‑1906469 | Further discussion on solutions for EN-DC FDD-TDD High Power UE | CHTTL | imported from 3GU |
R4‑1906470 | CR on the serving cell applicability (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906471 | Discussion on supported gap patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1906472 | LS reply on capability of measurement gap patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1906473 | CR on applicability of GP with short MGL in 38.133 (section 9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906474 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1906475 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906476 | Discussion on the measurement applicability of supported gap patterns | Huawei, HiSilicon | imported from 3GU |
R4‑1906477 | CR on default gap sharing scheme in 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1906478 | CR on default gap sharing scheme in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1906479 | CR on default gap sharing scheme in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906480 | Correction on the Tiu in handover in TS36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1906481 | Correction on the Tiu in handover in TS36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906482 | CR on PSCell addition delay R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1906483 | CR on PSCell addition delay R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906484 | Discussion on the TCI state swittching | Huawei, HiSilicon | imported from 3GU |
R4‑1906485 | CR on the TCI switching delay (section 8.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1906486 | Correction on test case of UL carrier reconfiguration delay in ENDC (section A.4.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906487 | Correction on test case of UL carrier reconfiguration delay in SA (section A.6.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906488 | Discussion on scheduling restriction on RMSI transmission with patter 2/3 | Huawei, HiSilicon | imported from 3GU |
R4‑1906489 | CR on scheduling restriction on intra-frequency measurement (section 9.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1906490 | CR on scheduling restriction on L1-RSRP measurement (section 9.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906491 | Discussion on uplink timing on high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1906492 | CR on uplink timing on high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1906493 | Discussion on measurement requirements in high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1906494 | CR on cell reselection requirements in high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1906495 | CR on measurement requirements in high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑1906496 | Discussion on Capability and Configuration Signaling for LTE high speed in Rel.16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906497 | LS on signalling on high speed | Huawei, HiSilicon | imported from 3GU |
R4‑1906498 | Discussion on the measurement requirements in enhanced mobility | Huawei, HiSilicon | imported from 3GU |
R4‑1906499 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1906500 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1906501 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1906502 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906503 | Discussion on remaining issues on UE timing requirements due to beam transition | Huawei, HiSilicon | imported from 3GU |
R4‑1906504 | Draft CR on maintaining UE timing requirements (section 7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906505 | DraftCR on interruption requirements due to TCI state switching in FR2 (new section 8.2.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1906506 | Draft CR on maintaining MTTD requirements for intra-band sync EN-DC (section 7.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1906507 | Discussion on MRTD requirements for NR intra-band non-contigous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1906508 | Draft CR on maintaining MRTD requirements for NR intra-band non-contigous CA (section 7.6.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906509 | Discussion on remaining issues for CBD requirements in DRX | Huawei, HiSilicon | imported from 3GU |
R4‑1906510 | DraftCR on correcting candidate beam detection requirements (section 8.5.5 and 8.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906511 | DraftCR on measurement restrictions for candidate beam detection (section 8.5.5 and 8.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906512 | DraftCR on correcting the conditions in section B.2.4 B.2.5 and B.2.6 | Huawei, HiSilicon | imported from 3GU |
R4‑1906513 | DraftCR on modifying SSB based measurement accuracy tessts for EN-DC (section A.4.7.1.1 and A.5.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906514 | DraftCR on modifying SSB based measurement accuracy tests for SA (sectionA.6.7.1.1 and A.7.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906515 | Discussion on SNR test setup for BFD and link recovery tests | Huawei, HiSilicon | imported from 3GU |
R4‑1906516 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.3 and A.4.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906517 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 (section A.6.5.5.3 and A.6.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906518 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.3 and A.5.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906519 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 (section A.7.5.5.3 and A.7.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906520 | Discussion on RRM requirements of NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1906521 | Discussion on UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1906522 | WF on UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1906523 | Correction on definition of MRTD for Dual Connectivity | Huawei, HiSilicon | imported from 3GU |
R4‑1906524 | Correction on interruption for PSCell release | Huawei, HiSilicon | imported from 3GU |
R4‑1906525 | Correction on interruption for SCell addition or release | Huawei, HiSilicon | imported from 3GU |
R4‑1906526 | Maintenance draftCR on handover test cases for FR1 (section A.6.3.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906527 | Maintenance draftCR on idle mode test cases for FR1 (section A.6.1.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906528 | Maintenance draftCR on inter-RAT measurement test cases for FR1 (section A.6.6.3.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906529 | FR2 intra-freqeuncy measurement requriements | Huawei, HiSilicon | imported from 3GU |
R4‑1906530 | CR on FR2 intra-freqeuncy measurement requriements (section 9.1.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906531 | CR for intra-frequency measurement requriements maintainance (section 9.2.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1906532 | Remaining issues in inter-RAT RSTD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1906533 | CR for inter-RAT RSTD measurement on FDD E-UTRA carrier (section 9.4.4.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1906534 | CR for inter-RAT RSTD measurement on TDD E-UTRA carrier (section 9.4.4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1906535 | Discussion on remaining issues in RLM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1906536 | CR on measurement restriction for RLM (section 8.1.1, 8.1.2, 8.1.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1906537 | CR on scheduling restriction for RLM (section 8.1.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1906538 | Further discussion on Scell activation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1906539 | Discussion on remaining issues in known cell condition for SCell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1906540 | CR on SCell activation requirements (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1906541 | Discussion on remaining issues in BFD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1906542 | CR on measurement restriction for BFD (section 8.5.2, 8.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1906543 | CR on edtorial maintenance of BFD requirements (section 8.5.1, 8.5.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1906544 | Discussion on remaining issues in L1-RSRP measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1906545 | CR on handling of L1-RSRP measurement RS FDMed with other RS (section 9.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1906546 | Discussion on definition of QCL | Huawei, HiSilicon | imported from 3GU |
R4‑1906547 | CR to add QCL definition (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906548 | CR to add FR2 side conditions for RSRQ and SINR (section 10.1.8/10/13/15) | Huawei, HiSilicon | imported from 3GU |
R4‑1906549 | CR to update side conditions for L1-RSRP accuracy (section 10.1.19/20) | Huawei, HiSilicon | imported from 3GU |
R4‑1906550 | CR to add FR2 side condition for SFTD for NE-DC (section 10.1.21) | Huawei, HiSilicon | imported from 3GU |
R4‑1906551 | CR to add FR2 side condition for SFTD for EN-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1906552 | CR to add FR2 side condition for SFTD for EN-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1906553 | Discussion on remaining issues in AoA setup in FR2 RRM test | Huawei, HiSilicon | imported from 3GU |
R4‑1906554 | Discussion on antenna gain for FR2 RRM test | Huawei, HiSilicon | imported from 3GU |
R4‑1906555 | Discussion on remaining test method issues for FR2 RRM test | Huawei, HiSilicon | imported from 3GU |
R4‑1906556 | Update to TRS configuration for RRM tests (A.3.17) | Huawei, HiSilicon | imported from 3GU |
R4‑1906557 | Maintanance of inter-frequency RSRP accuracy test cases for FR1 (section A.4.7.1.2, A.6.7.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1906558 | Maintanance of inter-frequency RSRP accuracy test cases for FR2 (section A.5.7.1.2-3, A.7.7.1.2-3) | Huawei, HiSilicon | imported from 3GU |
R4‑1906559 | Maintenance of test case for CSI-RS based RLM EN-DC (A.4.5.1.5, A.5.5.1.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1906560 | Maintenance of test case for CSI-RS based RLM SA (A.6.5.1.5, A.7.5.1.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1906561 | Further discussion on L1-RSRP test | Huawei, HiSilicon | imported from 3GU |
R4‑1906562 | Maintanance of L1-RSRP accuracy test cases for FR1 (section A.4.7.4, A.6.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906563 | Maintanance of L1-RSRP accuracy test cases for FR2 (section A.5.7.4, A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906564 | Addition of L1-RSRP delay test in FR1 (section A.4.6, A.6.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906565 | Addition of L1-RSRP delay test in FR2 (section A.5.6, A.7.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1906566 | Discussion on CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1906567 | Initial simulation results for SRS-RSRP measurement performance | Huawei, HiSilicon | imported from 3GU |
R4‑1906568 | Maintenance of PSCell addition requirements for NR-DC (section 8.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1906569 | Discussion on SFTD measurement in NR SA | Huawei, HiSilicon | imported from 3GU |
R4‑1906570 | [draft] Reply LS on SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1906571 | CR on introduction of SFTD measurement requriements for NR SA (section 9.3.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1906572 | CR on introduction of interruption requirements for inter-frequency SFTD measurement (section 8.2.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1906573 | CR for eMTC re-establishment test case | Huawei, HiSilicon | imported from 3GU |
R4‑1906574 | CR for eMTC re-establishment test case | Huawei, HiSilicon | imported from 3GU |
R4‑1906575 | CR for eMTC re-establishment test case | Huawei, HiSilicon | imported from 3GU |
R4‑1906576 | CR for eMTC RSTD test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1906577 | CR for eMTC RSTD test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1906578 | CR for eMTC RSTD test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1906579 | CR for applicability of Rel-15 requirements for non-BL | Huawei, HiSilicon | imported from 3GU |
R4‑1906580 | CR for applicability of Rel-16 requirements for non-BL | Huawei, HiSilicon | imported from 3GU |
R4‑1906581 | Discussion on quality reporting in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1906582 | Discussion on MWUS requirements in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1906583 | Discussion on PUR in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1906584 | CR for relaxed serving cell monitoring for Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1906585 | WF on Rel-16 eMTC RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1906586 | Further aspects on coexistence scenarios between 15kHz SCS NR and in-band NB-IoT | CHTTL | imported from 3GU |
R4‑1906587 | Discussion on the operating scenarios for NB-IoT with NR in-band/guard band | CHTTL | imported from 3GU |
R4‑1906588 | Demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906589 | Updated Summary of simulation results for Rel-15 FeNB-IoT NPRACH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906590 | CR 36.104 Corrections to demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906591 | CR 36.104 Corrections to demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906592 | Proposal on correction of PDSCH allocation of Test Model definitions | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906593 | CR 36.141: Corrections to demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906594 | Draft CR to TS38.141-1: Correction on test model TM1.2, 3.2, 3.3 (4.9.2.2, 4.9.2.3) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906595 | CR 36.141: Corrections to demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906596 | TP to the new TR related to NB-IoT: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1906597 | TP to the new TR related to NB-IoT: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1906598 | Demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906599 | FR2 Tx Off power measurement MU table | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1906600 | CR 36.104 Corrections to demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906601 | CR 36.104 Corrections to demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906602 | Discussion on NR and NB-IoT coexistence | ZTE Corporation | imported from 3GU |
R4‑1906603 | Discussion on NR and NB-IoT coexistence | ZTE Corporation | imported from 3GU |
R4‑1906604 | Discussion on NR and NB-IoT coexistence | ZTE Corporation | imported from 3GU |
R4‑1906605 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906606 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906607 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906608 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT M1/M2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906609 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906610 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906611 | CR of adding LTE B42/B43 for UE CAT_M1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906612 | CR of adding LTE B42/B43 for UE CAT_M1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906613 | CR of adding LTE B42/B43 for UE CAT_M1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1906614 | CR of adding LTE B42/B43 for UE CAT_M2 in R16 | Ericsson; Softbank | imported from 3GU |
R4‑1906615 | CR of adding LTE B42/B43 for UE CAT_M2 in R16 | Ericsson; Softbank | imported from 3GU |
R4‑1906616 | CR of adding LTE B42/B43 for UE category NB2 in R16 | Ericsson; Softbank | imported from 3GU |
R4‑1906617 | Regulation aspect for IAB operation within adjacent TDD network | Ericsson | imported from 3GU |
R4‑1906618 | On radio architecture discussion of IAB node | Ericsson | imported from 3GU |
R4‑1906619 | initial consideration on coexisting assumption of IAB network | Ericsson | imported from 3GU |
R4‑1906620 | on Antenna of IAB node | Ericsson | imported from 3GU |
R4‑1906621 | Further Scope discussion on IAB | Ericsson | imported from 3GU |
R4‑1906622 | SSB raster of NR-U for 5GHz | Ericsson | imported from 3GU |
R4‑1906623 | SSB raster of NR-U for 6GHz | Ericsson | imported from 3GU |
R4‑1906624 | Channle raster of NR-U for 5 GHz | Ericsson | imported from 3GU |
R4‑1906625 | Channle raster of NR-U for 6 GHz | Ericsson | imported from 3GU |
R4‑1906626 | In-device co-existing | Ericsson | imported from 3GU |
R4‑1906627 | TP on general aspect | Ericsson | imported from 3GU |
R4‑1906628 | TP for background and channel raster for TR 36.abc | Ericsson | imported from 3GU |
R4‑1906629 | Nominal channel spacing for CA and definition of contiguous/non-contiguous CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906630 | Threshold for no-contiguous CA spacing for FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906631 | Threshold for no-contiguous CA spacing for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906632 | Threshold for no-contiguous CA spacing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906633 | CA nominal channel spacing alignment among sub-carrier spacing for FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906634 | CA nominal channel spacing alignment among sub-carrier spacing for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906635 | CA nominal channel spacing alignment among sub-carrier spacing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906636 | Maximum uplink duty cycle for FR2 UE and its implications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906637 | Draft CR to TS38.101-2 on FR2 PC3 UE maxUplinkDutyCycle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906638 | BC tolerance requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906639 | Discussion on LTE/NR spectrum sharing in Band 41/n41 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906640 | View on n259 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906641 | Draft CR to TS38.141-2 on TT and MU tables for FR2 Tx OFF power measurement (4.1.2.2, C.1) | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1906642 | TP to the new TR related to MTC: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1906643 | CR 36.141 Corrections to demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906644 | CR 36.141 Corrections to demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906645 | Discussion on NR and MTC coexistence | ZTE Corporation | imported from 3GU |
R4‑1906646 | Discussion on gap sharing scheme in NR-DC | MediaTek inc. | imported from 3GU |
R4‑1906647 | CR on TS38.133 for CSSF outside gap when SFTD measurement is configured (Section 9.1.5) | MediaTek inc. | imported from 3GU |
R4‑1906648 | Reply LS on mandatory gap pattern | MediaTek inc. | imported from 3GU |
R4‑1906649 | Discussion capability of measurement gap patterns | MediaTek inc. | imported from 3GU |
R4‑1906650 | CR on TS38.133 for gap pattern signaling (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1906651 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1906652 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1906653 | CR on TS38.133 for definition of detectable cell (Section 9.2.4.3, Section 9.3.6.3) | MediaTek inc. | imported from 3GU |
R4‑1906654 | CR on TS38.133 for timing advance adjustment (Section 7.3) | MediaTek inc. | imported from 3GU |
R4‑1906655 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR1 (Section A.4.7.3) | MediaTek inc. | imported from 3GU |
R4‑1906656 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR2 (Section A.5.7.3) | MediaTek inc. | imported from 3GU |
R4‑1906657 | CR on TS38.133 for SA SS-SINR tests with PSCell in FR1 (Section A.6.7.3) | MediaTek inc. | imported from 3GU |
R4‑1906658 | CR on TS38.133 for SA SS-SINR tests with PSCell in FR2 (Section A.7.7.3) | MediaTek inc. | imported from 3GU |
R4‑1906659 | CR on TS38.133 E-UTRAN – NR inter-RAT measurements test case with FR1 target cell and FR2 target cell (Section A.8.5.2) | MediaTek inc. | imported from 3GU |
R4‑1906660 | Discussion on UE dynamic adaptation to the maximum number of MIMO layers | MediaTek inc. | imported from 3GU |
R4‑1906661 | LS on switching and interruption time for UE dynamic adaptation to the maximum number of MIMO layers | MediaTek inc. | imported from 3GU |
R4‑1906662 | Basket WI to manage new Rel-16 configurations | Verizon UK Ltd | imported from 3GU |
R4‑1906663 | Discussion on NR and MTC coexistence | ZTE Corporation | imported from 3GU |
R4‑1906664 | Draft CR to TR38.817-02 on MU budget table for FR2 Tx OFF power (12.3.6) | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1906665 | Simulation results for RSS based RSRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906666 | Clarification on target resource blocks for EVM measurement | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906667 | Discussion on NR and MTC coexistence | ZTE Corporation | imported from 3GU |
R4‑1906668 | New US mmWave Frequency Band | Verizon UK Ltd | imported from 3GU |
R4‑1906669 | Considerations on LTE-MTC coexistence with NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906670 | Draft CR to TS38.141-1 on target resource block clarification for EVM measurement (4.9.2.2, 4.9.2.3, 6.5.3.5) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906671 | Discussion on NR and MTC coexistence | ZTE Corporation | imported from 3GU |
R4‑1906672 | Draft CR to TS38.141-2 on target resource block clarification for EVM measurement (4.9.2.2, 4.9.2.3, 6.6.3.5) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906673 | Draft Item for New US mmWave Band | Verizon UK Ltd | imported from 3GU |
R4‑1906674 | CR to TS 37.145-2: Correction to procedure for SEM and OBUE | Ericsson | imported from 3GU |
R4‑1906675 | CR to TS 37.145-2: Correction to reference to Annex | Ericsson | imported from 3GU |
R4‑1906676 | Draft CR to TS 38.141-2: Added description of symbol TRP Estimate | Ericsson | imported from 3GU |
R4‑1906677 | Draft CR to TS 38.141-2. Adjusting use of TRP estimate when correction factors are used | Ericsson | imported from 3GU |
R4‑1906678 | CR to TS 37.145-2: Improved description of symbol TRP Estimate | Ericsson | imported from 3GU |
R4‑1906679 | CR to TS 37.145-2: Adjusting use of TRP estimate when correction factors are used | Ericsson | imported from 3GU |
R4‑1906680 | CR to TS 37.145-2: Clarifying sensitivity procedure | Ericsson | imported from 3GU |
R4‑1906681 | Draft CR to TS 38.141-2: Clarifying sensitivity procedure | Ericsson | imported from 3GU |
R4‑1906682 | CR to TS 37.145-2: Clarification of TRP methods applicability in Annex F | Ericsson | imported from 3GU |
R4‑1906683 | Draft CR to TS 38.141-2: Clarification of TRP methods applicability in Annex I | Ericsson | imported from 3GU |
R4‑1906684 | Open Issues in Annex F for EVM Measurement | Ericsson | imported from 3GU |
R4‑1906685 | Summary of 256QAM for FR2 analysis | Ericsson | imported from 3GU |
R4‑1906686 | TAE Requirement Details | Ericsson | imported from 3GU |
R4‑1906687 | TP to TR 38.820: Inclusion of NF Background Information for BS requirements | Ericsson | imported from 3GU |
R4‑1906688 | CR to TS 37.145-2: Correction to Total Radiated Power definition | Ericsson | imported from 3GU |
R4‑1906689 | CR to TR 37.843: Upper limit for angular step for TRP calculation | Ericsson | imported from 3GU |
R4‑1906690 | Draft CR to TS 38.141-2: Corrections to Annex I (TRP) | Ericsson | imported from 3GU |
R4‑1906691 | TS 37.145-2 Correction on usage of terms TRP and EIRP | Ericsson | imported from 3GU |
R4‑1906692 | CR to TS 37.145-2: Correction of Radiated Interface Boundary (RIB) definition | Ericsson | imported from 3GU |
R4‑1906693 | CR to TP 37.843: Correction on usage of term EIRP | Ericsson | imported from 3GU |
R4‑1906694 | CR to TS 37.145-2: Clarification on non-steerable beam | Ericsson | imported from 3GU |
R4‑1906695 | Draft CR to TS 38.141-2: Clarification on non-steerable beam | Ericsson | imported from 3GU |
R4‑1906696 | Draft CR to TS 38.141-2: Correction on usage of terms TRP and EIRP | Ericsson | imported from 3GU |
R4‑1906697 | Observations on synchronization raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1906698 | Synchronization and channel raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1906699 | Specification impact of introduction of 10MHz channel bandwidth | Qualcomm Incorporated | imported from 3GU |
R4‑1906700 | Scenarios for IAB network deployment | Qualcomm Incorporated | imported from 3GU |
R4‑1906701 | Scenarios for IAB network operation | Qualcomm Incorporated | imported from 3GU |
R4‑1906702 | Simulation methodology and assumptions for IAB co-existence study | Qualcomm Incorporated | imported from 3GU |
R4‑1906703 | Qualcomm results for UE-to-UE CLI | Qualcomm Incorporated | imported from 3GU |
R4‑1906704 | FR2 Test Equipment MU values for BS demodulation conformance testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906705 | Simulation summary of NR PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1906706 | Editorial corrections for 38.101-4 PBCH tables | Ericsson | imported from 3GU |
R4‑1906707 | Editorial corrections for 38.101-4 PDCCH tables | Ericsson | imported from 3GU |
R4‑1906708 | Change of throughput gain and SNR for FR2 RI test cases | Ericsson | imported from 3GU |
R4‑1906709 | Change of throughput gain and SNR for FR2 RI test case 2 and 3 | Ericsson | imported from 3GU |
R4‑1906710 | Simulation results for NR UE PDSCH demodulation 2nd priority TDD patterns | Ericsson | imported from 3GU |
R4‑1906711 | revised WID for LTE 3DL/1UL CA Rel-16 | Huawei,HiSilicon | imported from 3GU |
R4‑1906712 | Simulation assumption for IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1906713 | Simulation assumption for IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1906714 | Discussion on TS 36.133 and TS 38.133 specification structures for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906715 | Discussion on NR-U RRM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906716 | Introduction of completed R16 3DL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1906717 | CR to TR 37.145-1 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1906718 | CR to TR 37.145-2 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1906719 | Corrections to TS38.141-1 for Timing Alignment Error (TAE) testing | Huawei, HiSilicon | imported from 3GU |
R4‑1906720 | Corrections to TS38.141-2 for Timing Alignment Error (TAE) testing | Huawei, HiSilicon | imported from 3GU |
R4‑1906721 | Removal of "TX Diversity" in Active Antenna System Base Station Specs | Huawei, HiSilicon | imported from 3GU |
R4‑1906722 | TP to remove procedural elements for EVM in core spec | Huawei, HiSilicon | imported from 3GU |
R4‑1906723 | CR to TS 38.104 on EVM subclauses 6.5.2.3, 9.6.2.3.1 | Huawei, HiSilicon | imported from 3GU |
R4‑1906724 | Discussion on EVM issues for 38.141-1 Annex F | Huawei, HiSilicon | imported from 3GU |
R4‑1906725 | CR to TR 38.817-02 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1906726 | CR to TR 37.843 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1906727 | Analysis of system parameters for the study of 7-24 GHz | Huawei, HiSilicon | imported from 3GU |
R4‑1906728 | RF architecture for IAB node | ZTE Corporation | imported from 3GU |
R4‑1906729 | RF architecture for IAB node | ZTE Corporation | imported from 3GU |
R4‑1906730 | RF architecture for IAB node | ZTE Corporation | imported from 3GU |
R4‑1906731 | Revised WID Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1906732 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1906733 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1906734 | TR 38.716-01-01 v0.5.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1906735 | TR 37.716-31-11 v0.5.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1906736 | Introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1906737 | CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1906738 | CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1906739 | CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1906740 | TP for TR 38.716-02-00 to include CA_n1-n28 | Ericsson, BT plc | imported from 3GU |
R4‑1906741 | TP for TR 38.716-02-00 to include CA_n3-n28 | Ericsson, BT plc | imported from 3GU |
R4‑1906742 | TP for TR 38.716-02-00 to include CA_n7-n28 | Ericsson, BT plc | imported from 3GU |
R4‑1906743 | TP for TR 38.716-02-00 to include CA_n20-n28 | Ericsson, BT plc | imported from 3GU |
R4‑1906744 | TP for TR 37.716-11-11 to include DC_66_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1906745 | TP for TR 37.716-21-21 to include MSD for DC_66_n25-n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1906746 | TP for TR 37.716-21-11 to include MSD for DC_1A-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1906747 | TP for TR 37.716-21-11 to include MSD for DC_3A-28A_n5A, 3C-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1906748 | TP for TR 37.716-21-11 to include MSD for DC_7A-28A_n5A, 7C-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1906749 | TP for TR 37.716-21-11 to include DC_7_n3-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1906750 | TP for TR 37.716-21-11 to include DC_20_n3-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1906751 | TP for TR 37.716-21-11 to include DC_7_n1-n78 | Ericsson, CHTTL, Swisscom | imported from 3GU |
R4‑1906752 | TP for TR 37.716-21-11 to include DC_20_n1-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1906753 | TP for TR 37.716-21-11 to include DC_3-7_n1-n78 | Ericsson, CHTTL, Swisscom | imported from 3GU |
R4‑1906754 | draft CR to simplify Table 5.5A.2-2 in 38.101-2 | Ericsson | imported from 3GU |
R4‑1906755 | draft CR to include missing fallbacks n260 and n261 | Ericsson | imported from 3GU |
R4‑1906756 | TP for TR 36.716-02-02 to include LTE CA_48-66 with 48-66 UL | Ericsson, Verizon | imported from 3GU |
R4‑1906757 | TP for TR 36.716-02-02 to include LTE CA_2-48 with 2-48 UL | Ericsson, Verizon | imported from 3GU |
R4‑1906758 | New WID: Rel-16 NR inter-band CA for 4 bands | Swisscom, Ericsson | imported from 3GU |
R4‑1906759 | Phase noise for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906760 | Remaining Issues on UE Timing Requirements under Beam Switch | Ericsson | imported from 3GU |
R4‑1906761 | UE Transmit Timing Requirements under Beam Switch (7.1.2) | Ericsson | imported from 3GU |
R4‑1906762 | Further analysis of RRC based BWP switching delay | Ericsson | imported from 3GU |
R4‑1906763 | RRC based BWP switching delay requirement (8.6.3) | Ericsson | imported from 3GU |
R4‑1906764 | LTE test specific parameters for Inter-RAT test cases (A.3.7) | Ericsson | imported from 3GU |
R4‑1906765 | Applicabiity rules for test cases with different UE power class (A.3.18) | Ericsson | imported from 3GU |
R4‑1906766 | Correction to DRX cycle configurations (A.3.3) | Ericsson | imported from 3GU |
R4‑1906767 | Correction to Phase IV-47 Test cases: E-UTRAN inter-RAT NR cell search and measurement delay (A.8.4.2) | Ericsson | imported from 3GU |
R4‑1906768 | Analysis of E-UTRAN inter-RAT NR cell search and measurement delay test case in FR2 | Ericsson | imported from 3GU |
R4‑1906769 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case without SSB index and non-DRX in FR2 (A.8.4.2.5) | Ericsson | imported from 3GU |
R4‑1906770 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case without SSB index and in DRX in FR2 (A.8.4.2.6) | Ericsson | imported from 3GU |
R4‑1906771 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case with SSB index and non-DRX in FR2 (A.8.4.2.7) | Ericsson | imported from 3GU |
R4‑1906772 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case with SSB index and in DRX in FR2 (A.8.4.2.8) | Ericsson | imported from 3GU |
R4‑1906773 | Further Analysis of UE Timing Requirement under high speed scenario | Ericsson | imported from 3GU |
R4‑1906774 | UE Autonomous Timing Adjustment Requirement under High Speed Scenario | Ericsson | imported from 3GU |
R4‑1906775 | Analysis of OTA timing alignment for IAB | Ericsson | imported from 3GU |
R4‑1906776 | LS Response on OTA timing alignment for IAB | Ericsson | imported from 3GU |
R4‑1906777 | Analysis of RRM Requirement for IAB | Ericsson | imported from 3GU |
R4‑1906778 | Phase noise for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906779 | Phase noise for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906780 | Draft CR to TS38.141-2 on TT and MU tables for FR2 Perforamance test (4.1.2.4, C.3) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906781 | Phase noise for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906782 | Draft CR for correction of out-of-band blocking exceptions for CA in TS 38.101-1 | VODAFONE Group Plc | imported from 3GU |
R4‑1906783 | Draft CR to TS38.141-2 on FR2 MU tables correction on frequency range (4.1.2.2, 4.1.2.3) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906784 | Draft CR for correction of out-of-band blocking exceptions for SUL in TS 38.101-1 | VODAFONE Group Plc | imported from 3GU |
R4‑1906785 | Analysis of out-of-band blocking exceptions for some NR CA and SUL band combinations | VODAFONE Group Plc | imported from 3GU |
R4‑1906786 | PA characteristic for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906787 | PA characteristic for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906788 | Draft CR for addition of mandatory simultaneous Rx/Tx capability for DC38_n78 in TS 38.101-3 | VODAFONE Group Plc | imported from 3GU |
R4‑1906789 | UE demod performance for LTE HST Rel16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906790 | DraftCR TS 38.101-3 Corrections to Intra-band ENDC MPR text | Skyworks Solutions Inc. | imported from 3GU |
R4‑1906791 | Discussions on RRM requirements for transmissions using PUR for MTC | Ericsson | imported from 3GU |
R4‑1906792 | Discussions on scenarios for RSS based RRM measurement for MTC | Ericsson | imported from 3GU |
R4‑1906793 | RSS based RRM measurement simulation results | Ericsson | imported from 3GU |
R4‑1906794 | Way forward on Rel-16 MTC RRM enhancement | Ericsson | imported from 3GU |
R4‑1906795 | Discussions on RRM requirements for transmissions using PUR for NB-IoT | Ericsson | imported from 3GU |
R4‑1906796 | Remaining discussions on non-anchor carrier RRM measurements | Ericsson | imported from 3GU |
R4‑1906797 | LS on introducing of serving cell RRM measurements on non-anchor carrier for NB-IoT | Ericsson | imported from 3GU |
R4‑1906798 | Agreements for Rel-16 NB-IoT RRM enhancement | Ericsson | imported from 3GU |
R4‑1906799 | Discussions on RRM requirements for NR-U scenario C | Ericsson | imported from 3GU |
R4‑1906800 | Further discussion on BS types for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1906801 | TP for TR 37.815: Conclusion of SI for FDD+TDD EN-DC HPUE | China Unicom | imported from 3GU |
R4‑1906802 | LS on OTA testing of IoT devices | CTIA Over-the Air (OTA) W-IoT Sub Working Group | imported from 3GU |
R4‑1906803 | Remove [ ] and TBD from FR2 RSRQ accuracy | ANRITSU LTD | imported from 3GU |
R4‑1906804 | Nominal channel spacing related signaling information | ZTE Corporation | imported from 3GU |
R4‑1906805 | Nominal channel spacing related signaling information | ZTE Corporation | imported from 3GU |
R4‑1906806 | Nominal channel spacing related signaling information | ZTE Corporation | imported from 3GU |
R4‑1906807 | TP to TR 38.716-02-00 CA_n78-n257G with 2UL | LG Uplus | imported from 3GU |
R4‑1906808 | Timing Error impacts to CLI measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906809 | Simulation results for timing error impact on CLI measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906810 | Draft reply LS on SA Option 2 Core Requirement Dependencies | Huawei, HiSilicon | imported from 3GU |
R4‑1906811 | TP to TR 38.716-02-00 CA_n78-n257H with 2UL | LG Uplus | imported from 3GU |
R4‑1906812 | Further discussion on TM for TAE requirement | ZTE Corporation | imported from 3GU |
R4‑1906813 | TP to TR 38.716-02-00 CA_n78-n257I with 2UL | LG Uplus | imported from 3GU |
R4‑1906814 | Further discussion on TM for TAE requirement | ZTE Corporation | imported from 3GU |
R4‑1906815 | TP to TR 38.716-02-00 CA_n78-n257J with 2UL | LG Uplus | imported from 3GU |
R4‑1906816 | new WID for FR2 PC5 | Huawei, HiSilicon | imported from 3GU |
R4‑1906817 | TP to TR 38.716-02-00 CA_n78-n257K with 2UL | LG Uplus | imported from 3GU |
R4‑1906818 | TP to TR 38.716-02-00 CA_n78-n257L with 2UL | LG Uplus | imported from 3GU |
R4‑1906819 | Initial Analysis of some Release 16 two Bands two UL FR1 Cases | Skyworks Solutions Inc. | imported from 3GU |
R4‑1906820 | TP to TR 38.716-02-00 CA_n78-n257M with 2UL | LG Uplus | imported from 3GU |
R4‑1906821 | Updated PDCCH simulation results | Huawei,HiSilicon | imported from 3GU |
R4‑1906822 | Draft CR for TR38.810: Interpolation at or near the Pole for TRP | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906823 | On 30cm Quiet Zone | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906824 | Draft CR for TR38.810: On 30cm QZ | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906825 | Draft CR for TR38.810: TRP grids for QoQZ procedure | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906826 | Minimum Measurement Distance Proposal for FR1 NR MIMO Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906827 | Channel model parameters for UMi and UMa CDL-A and C for FR1 | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906828 | Channel model parameters for UMi and InO CDL-A and C for FR2 | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906829 | On 2D NR FR1 MPAC Implementations | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906830 | DUT test zone size evaluation for UMi and InO at FR 2 | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1906831 | TP to TR38.827 v1.0.0 on ripple test | CAICT | imported from 3GU |
R4‑1906832 | Further discussion on BS intra-band NCCA TAE requirement | ZTE Corporation | imported from 3GU |
R4‑1906833 | TP to TR38.827 v1.0.0 on test methods channel model | CAICT | imported from 3GU |
R4‑1906834 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1906835 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1906836 | TR 36.716-02-01-030 Rel-16 2 Bands DL and 1 Band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1906837 | Discussion on the feasibility of simultaneous transmission approach for 2AoA cases | Qualcomm Incorporated | imported from 3GU |
R4‑1906838 | Draft CR to TR 38.810 on the feasibility of simultaneous transmission approach | Qualcomm Incorporated | imported from 3GU |
R4‑1906839 | Considerations on FR2 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1906840 | Discussion on alternative test methods for FR2 TRx test cases with testability issues | Qualcomm Incorporated | imported from 3GU |
R4‑1906841 | Proposals on NR MIMO OTA | CAICT, SAICT | imported from 3GU |
R4‑1906842 | On UE TX Wideband operation | LG Electronics Finland | imported from 3GU |
R4‑1906843 | On performance of RF filters for 12GHz range | LG Electronics Finland | imported from 3GU |
R4‑1906844 | Further discussion on FR2 MRTD requirement | ZTE Corporation | imported from 3GU |
R4‑1906845 | On AGC settling time for NR V2X | LG Electronics Finland | imported from 3GU |
R4‑1906846 | Views on the 7 – 24 GHz Frequency range for handheld mobile devices | Sony | imported from 3GU |
R4‑1906847 | Further discussion on FR2 MRTD requirement | ZTE Corporation | imported from 3GU |
R4‑1906848 | Analysis of In-device coexistence scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1906849 | Analysis of adjacent channel coexistence scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1906850 | On RF parameters for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1906851 | TP on In-device Coexistence Scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1906852 | TP on Editorial Corrections to TR38.886 | Huawei, HiSilicon | imported from 3GU |
R4‑1906853 | Further discussion on FR2 MRTD requirement | ZTE Corporation | imported from 3GU |
R4‑1906854 | TP for TR 36.716-03-01: 1A-1A-3C-28A_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1906855 | Draft CR for TS 38.101-1 Clarification on single antenna port | Huawei, HiSilicon | imported from 3GU |
R4‑1906856 | Draft CR for TS 38.101-1 Reference waveform for UL MIMO MOP | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1906857 | Reply LS to RAN5 on MOP for UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1906858 | On SAR solutions for FDD+TDD HPUE | Huawei, HiSilicon | imported from 3GU |
R4‑1906859 | On deriving FDD+TDD TDM pattern based on max UL duty cycle capability | Huawei, HiSilicon | imported from 3GU |
R4‑1906860 | TP for TR 37.815 Example TDM patterns for SAR limits | Huawei, HiSilicon | imported from 3GU |
R4‑1906861 | On frequency range for NR band n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1906862 | BS RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1906863 | TP for TR 38.887 Regulatory aspects around 40GHz | Huawei, HiSilicon | imported from 3GU |
R4‑1906864 | On BCS for inter-band EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1906865 | Draft CR for TS 38.101-3 Correction of BCS for inter-band EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1906866 | Draft CR for TS 38.101-1 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1906867 | Draft CR for TS 38.101-2 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1906868 | Consideration on handling SRS antenna switching requirement in Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1906869 | MSD analysis for DC_38A_n78A due to cross band isolation | Huawei, HiSilicon,Vodafone | imported from 3GU |
R4‑1906870 | Reply LS on transient period for antenna switching or frequency hopping | Huawei, HiSilicon | imported from 3GU |
R4‑1906871 | Draft CR for TS 38.101-1 UE optional bandwidth for FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1906872 | SAR considerations for SA SUL band combinations | Huawei, HiSilicon | imported from 3GU |
R4‑1906873 | Further discussion on FR2 MRTD requirement | ZTE Corporation | imported from 3GU |
R4‑1906874 | Draft Response LS on UL sharing applicability in different scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906875 | Draft CR to 38.101-3: ULSUP-TDM related clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906876 | Considerations for potential SAR issues with NR UL + SUL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906877 | Draft CR to 38.104 Definition of contiguous transmission bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906878 | Draft CR to 38.141-2 Definition of contiguous transmission bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906879 | TP to TR 38.828 ACI simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906880 | TP to TR 38.828 on adjacent channel coexistence summary | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906881 | IAB scenarios and simulation assumptions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906882 | On BS classes supported in IAB-node access link | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906883 | Impact of Tx and Rx impairments | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906884 | BS RF technology aspects for 7-24 GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906885 | Considerations on RSSI measurements for CLI | Ericsson | imported from 3GU |
R4‑1906886 | Considerations on SRS-RSRP measurements for CLI | Ericsson | imported from 3GU |
R4‑1906887 | Simulation results for SRS-RSRP measurements | Ericsson | imported from 3GU |
R4‑1906888 | On L1-RSRP reporting and TCI state activation at SCell activation | Ericsson | imported from 3GU |
R4‑1906889 | CR 38.133 (8.3.2) L1-RSRP reporting and TCI state activation at SCell activation | Ericsson | imported from 3GU |
R4‑1906890 | On SFTD between NR PCell and NR neighbour cell | Ericsson | imported from 3GU |
R4‑1906891 | CR 38.133 (9.3.8) Introduction of inter-frequency SFTD core requirements | Ericsson | imported from 3GU |
R4‑1906892 | CR 38.133 (8.2.2) Introduction of SFTD interruption requirements | Ericsson | imported from 3GU |
R4‑1906893 | LS reply on SFTD measurements | Ericsson | imported from 3GU |
R4‑1906894 | CR 38.133 (10.1.21) Side conditions for SFTD in FR2 | Ericsson | imported from 3GU |
R4‑1906895 | CR 36.133 Side conditions for SFTD in FR2 (Rel-15) | Ericsson | imported from 3GU |
R4‑1906896 | CR 36.133 Side conditions for SFTD in FR2 (Rel-16) | Ericsson | imported from 3GU |
R4‑1906897 | CR 36.133 Correction to SFTD interruption requirements (Rel-15) | Ericsson | imported from 3GU |
R4‑1906898 | CR 36.133 Correction to SFTD interruption requirements (Rel-16) | Ericsson | imported from 3GU |
R4‑1906899 | On TCI state switching requirements | Ericsson | imported from 3GU |
R4‑1906900 | CR 38.133 (8.10) Correction of Active TCI state switching delay requirement | Ericsson | imported from 3GU |
R4‑1906901 | Discussion on RRM test methodologies applicability for 1 AoA and 2 AoA | Intel Corporation | imported from 3GU |
R4‑1906902 | Discussion on NR ATF measurements | Intel Corporation | imported from 3GU |
R4‑1906903 | LS on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1906904 | Further system simulation results for Rel-16 HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906905 | Draft CR to TS 38.141-01: Test model (section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1906906 | Draft CR to TS 38.141-02: Test model (section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1906907 | Draft CR to TS 38.104: TAE requirement (Section 6.5.3 and 9.6.3) | ZTE Corporation | imported from 3GU |
R4‑1906908 | Draft CR to TS 38.141-01: TAE (section 6.5.4) | ZTE Corporation | imported from 3GU |
R4‑1906909 | Draft CR to TS 38.141-02: TAE requirement (section 6.6.4) | ZTE Corporation | imported from 3GU |
R4‑1906910 | CR to TS 37.145-01: TAE requirement (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1906911 | CR to TS 37.145-02: TAE requirement (section 6.6.3) | ZTE Corporation | imported from 3GU |
R4‑1906912 | Preliminary BS demodulation results under bi-directional scenarios for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906913 | CR to TS 37.105: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906914 | CR to TS 37.145-2: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906915 | Draft CR to TS 38.104: Clarification on application of interfering signal offsets for OTA ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906916 | Draft CR to TS 38.104: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906917 | Draft CR to TS 38.141-2: Clarification on application of OTA receiver requirements for BS supporting polarization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906918 | Draft CR to TS 38.104: Clarification on type of interfering signal for ACS, in-band blocking and ICS requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906919 | Draft CR to TS 38.141-1: Clarification on type of interfering signal for ACS, in-band blocking and ICS requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906920 | Draft CR to TS 38.141-2: Clarification on type of interfering signal for ACS, in-band blocking and ICS requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906921 | Draft CR to TS 38.104: Correction on interfering signal mean power for receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906922 | Draft CR to TS 38.141-1: Correction on interfering signal mean power for receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906923 | Draft CR to TS 38.141-2: Correction on interfering signal mean power for receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906924 | System level simulation results for uplink coexistence study between R15 NR and R13/R14/R15 NB-IoT standalone operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906925 | System level simulation results for uplink coexistence study between R15 NR and R13/R14/R15 NB-IoT standalone operation (with NR channel model) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906926 | TP to TR38.xxx: Summary of system level simulation results for coexistence study between R15 NR and R13/R14/R15 NB-IoT standalone operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906927 | Proposals on definitions of in-band, guard band and stand-alone operations when NB-IoT is located within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906928 | Proposals on power boosting requirement when NB-IoT is located within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906929 | CR to TS 38.817-01: Coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 | Nokia, Sprint, Ericsson | imported from 3GU |
R4‑1906930 | Further discussion on FR2 MRTD requirement | ZTE Corporation | imported from 3GU |
R4‑1906931 | Further discussion on FR2 Cat B UEM | ZTE Corporation | imported from 3GU |
R4‑1906932 | Further discussion on TS38.141-01 Annex F | ZTE Corporation | imported from 3GU |
R4‑1906933 | Further discussion on TS38.141-02 Annex F | ZTE Corporation | imported from 3GU |
R4‑1906934 | Corrections to NB-IoT PRACH test cases (Rel-13) | Rohde & Schwarz | imported from 3GU |
R4‑1906935 | Corrections to NB-IoT PRACH test cases (Rel-14) | Rohde & Schwarz | imported from 3GU |
R4‑1906936 | Corrections to NB-IoT PRACH test cases (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1906937 | Corrections to NB-IoT PRACH test cases (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1906938 | Draft CR to TR 38.133 with several corrections (multiple clauses affected) | Rohde & Schwarz | imported from 3GU |
R4‑1906939 | Draft CR to TR 38.810 with corrections for RRM FR2 testing | Rohde & Schwarz | imported from 3GU |
R4‑1906940 | On the probe layout on FR2 MPAC systems | Spirent Communications | imported from 3GU |
R4‑1906941 | Transient period capability | Qualcomm Inc. | imported from 3GU |
R4‑1906942 | On UE to UE Coexistence study of NR V2X at 5.9GHz | Qualcomm Inc. | imported from 3GU |
R4‑1906943 | On Band Definition of NR V2X | Qualcomm Inc. | imported from 3GU |
R4‑1906944 | AGC settling time for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1906945 | NR V2X IBE | Qualcomm Inc. | imported from 3GU |
R4‑1906946 | CR to TS 37.145-2: adding further details to spherical Fibonacci grids (F.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906947 | Options for TAE testing using MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1906948 | CR to TR 37.843: editorial corrections to spherical angle formula in subclause 10.8.2.4 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1906949 | B42_B43 A-MPR simulation result | Qualcomm Inc. | imported from 3GU |
R4‑1906950 | On HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1906951 | On HST UE Demod Test | Qualcomm Incorporated | imported from 3GU |
R4‑1906952 | Analysis of Doppler Shift Observed by Base Station in HST | Qualcomm Incorporated | imported from 3GU |
R4‑1906953 | On NR V2X RRM Core Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1906954 | Correct Inter-frequency Measurement condition | ANRITSU LTD | imported from 3GU |
R4‑1906955 | CR to TR 38.817-02: updating the FR2 OTA transmit ON/OFF column in Table 12.10.1-1 (12.10.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906956 | Transient period for antenna switching or frequency hopping | Qualcomm Inc. | imported from 3GU |
R4‑1906957 | Further Discussion of SCG MPR/A-MPR and PCMAX for EN-DC with Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1906958 | On conditional HO in LTE FeMob | Qualcomm Incorporated | imported from 3GU |
R4‑1906959 | Draft reply to LS on non-anchor carrier measurements for RRM | Qualcomm Incorporated | imported from 3GU |
R4‑1906960 | On MSG3 quality reporting in non-anchor carrier | Qualcomm Incorporated | imported from 3GU |
R4‑1906961 | On MTC MSG3 and connected quality reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1906962 | On MTC PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1906963 | On NB-IoT PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1906964 | On NB-IoT RRM measurements in non-anchor carrier | Qualcomm Incorporated | imported from 3GU |
R4‑1906965 | On RACH-less HO in NR | Qualcomm Incorporated | imported from 3GU |
R4‑1906966 | Simulation results for RSS based RRM measurements for MTC | Qualcomm Incorporated | imported from 3GU |
R4‑1906967 | On RSSI measurements for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1906968 | Draft CR to TS 38.141-2: adding further details to spherical Fibonacci grids (I.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1906969 | LS response to transient period for antenna switching or frequency hopping | Qualcomm Inc. | imported from 3GU |
R4‑1906970 | Draft CR for CORESET RMC Update (Section A.3.1.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1906971 | Draft CR PDSCH RMC Update (Section A.3.1.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1906972 | draftCR for TDD UL-DL configuration for 120kHZ SCS (Section A.3.1.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1906973 | UL Timing adjustment on UE beam switch | Qualcomm Incorporated | imported from 3GU |
R4‑1906974 | Scell activation timeline in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1906975 | Known cell condition for Scell activation in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1906976 | Test Setup for RRM tests in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1906977 | RRC based BWP swtich delay | Qualcomm Incorporated | imported from 3GU |
R4‑1906978 | Delay Requirements for active TCI state switch for PDCCH and PDSCH | Qualcomm Incorporated | imported from 3GU |
R4‑1906979 | Draft CR to TS 38.104: Time Alignment Error | Ericsson Inc. | imported from 3GU |
R4‑1906980 | draftCR on UE Transmit Timing in FR1 EN-DC (Section A.4.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1906981 | draftCR on UE Transmit Timing in FR2 EN-DC (Section A.5.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1906982 | draftCR on UE Transmit Timing in FR1 SA (Section A.6.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1906983 | draftCR on UE Transmit Timing in FR2 SA (Section A.7.4.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1906984 | UL Timing adjustment on UE beam switch | Qualcomm Incorporated | imported from 3GU |
R4‑1906985 | Disucssion on Scell activation timeline in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1906986 | Disucssion on Known cell condition for Scell activation in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1906987 | Test Setup for remaining RRM tests in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1906988 | Discussion on RRC based BWP swtich delay | Qualcomm Incorporated | imported from 3GU |
R4‑1906989 | Disucssion on Delay Requirements for active TCI state switch for PDCCH and PDSCH | Qualcomm Incorporated | imported from 3GU |
R4‑1906990 | Reply LS on maximum allowed SCell activation delay | Qualcomm Incorporated | imported from 3GU |
R4‑1906991 | Discussion on RRM requirements for CLI | Qualcomm Incorporated | imported from 3GU |
R4‑1906992 | NR TAE for intra- band non-contiguous CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906993 | Remaining issues on general aspects for NR BS demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906994 | Remaing issues on NR PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906995 | NR PUSCH for high speed in Rel.15 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906996 | Draft CR for TS 38.104: Introduction of PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906997 | Draft CR for TS 38.141-1: Introduction of PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906998 | Draft CR for TS 38.141-2: Introduction of PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1906999 | Margin of directivity for beam-based directions for in-band TX requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907000 | CR to TR38.817-02 Correction on beam based direcrtions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907001 | CR to TR37.843 Correction on beam based direcrtions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907002 | BS demodulation for LTE high speed in Rel.16 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907003 | Draft CR for editorial corrections in TS 38.101-2 | Google Inc. | imported from 3GU |
R4‑1907004 | Addition channel bandwidth of 30MHz for n50 in TS 38.101-1 | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1907005 | Addition channel bandwidth of 30MHz for n50 in TS 38.104 | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1907006 | Propagation in frequency range 7-24GHz | Huawei, HiSilicon | imported from 3GU |
R4‑1907007 | Update NS_42 into TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑1907008 | TP to TR 37.716-11-11: DC_1A_n41A | Huawei, Hisilicon | imported from 3GU |
R4‑1907009 | TP to TR 37.716-11-11: DC_28A_n41A | Huawei, Hisilicon | imported from 3GU |
R4‑1907010 | TP to TR 37.716-11-11: DC_28A_n50 | Huawei, Hisilicon | imported from 3GU |
R4‑1907011 | Draft CR to TS 38.141-1: Section 6.5.4 Time Alignment Error | Ericsson Inc. | imported from 3GU |
R4‑1907012 | New WID for Introduction of n29 | Dish Network | imported from 3GU |
R4‑1907013 | Draft CR to TS 38.141-1: Section 6.5.4 Time Alignment Error | Ericsson | imported from 3GU |
R4‑1907014 | Draft CR to TS 38.141-2: Section 6.6.4 OTA Time Alignment Error | Ericsson | imported from 3GU |
R4‑1907015 | TR 38.820: updated TR skeleton for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1907016 | Status update on the 7-24GHz SI work progress | Huawei | imported from 3GU |
R4‑1907017 | ECC CPG PT A group discussion on the IMT spectrum allocations in 7-24 GHz range | Huawei | imported from 3GU |
R4‑1907018 | Spectrum allocation in Europe: initial analysis of applications in 7 - 24 GHz range | Huawei | imported from 3GU |
R4‑1907019 | TP to TR 38.820: example frequency ranges selection | Huawei | imported from 3GU |
R4‑1907020 | Analysis of the deployment scenarios for 7-24GHz frequency range | Huawei | imported from 3GU |
R4‑1907021 | TP to TR 38.820: deployment scenarios for 7-24GHz frequency range | Huawei | imported from 3GU |
R4‑1907022 | TP to TR 38.820: single-band operation of NR BS | Huawei | imported from 3GU |
R4‑1907023 | TP to TR 38.820: BS EMC emission requirements for 7-24 GHz | Huawei | imported from 3GU |
R4‑1907024 | TP to TR 38.820: BS EMC immunity requirements for 7-24 GHz | Huawei | imported from 3GU |
R4‑1907025 | Discussion on the RI testing in 7-24 GHz range | Huawei | imported from 3GU |
R4‑1907026 | CR to TS 37.145-1: mirror of operating band and frequency range declaration from NR, Rel-13 | Huawei | imported from 3GU |
R4‑1907027 | CR to TS 37.145-1: mirror of operating band and frequency range declaration from NR, Rel-14 | Huawei | imported from 3GU |
R4‑1907028 | CR to TS 37.145-2: mirror of operating band and frequency range declaration from NR, Rel-13 | Huawei | imported from 3GU |
R4‑1907029 | CR to TS 37.145-1: mirror of operating band and frequency range declaration from NR, Rel-15 | Huawei | imported from 3GU |
R4‑1907030 | CR to TS 37.145-2: mirror of operating band and frequency range declaration from NR, Rel-14 | Huawei | imported from 3GU |
R4‑1907031 | CR to TS 37.145-2: mirror of operating band and frequency range declaration from NR, Rel-15 | Huawei | imported from 3GU |
R4‑1907032 | CR to TS 37.145-1: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1907033 | CR to TS 37.145-2: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1907034 | Draft CR to 38.141-1: corrections to the Annex F structure | Huawei | imported from 3GU |
R4‑1907035 | Draft CR to 38.141-2: corrections to the Annex F structure | Huawei | imported from 3GU |
R4‑1907036 | DraftCR to TS 38.141-1: removal of Rel-16 CRs from Rel-15 specification | Huawei | imported from 3GU |
R4‑1907037 | Draft CR to 38.101-1: Requirements for UL MIMO device and clarifications for basic requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1907038 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907039 | TR 36.716-04-01 v0.4.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907040 | Non-AAS CRs mirroring to the AAS specification | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907041 | Non-AAS CRs mirroring to the AAS specification | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907042 | Non-AAS CRs mirroring to the AAS specification | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907043 | CR to 25.104: Introduction of co-existence requirements with Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907044 | CR to 25.141: Introduction of co-existence requirements with Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907045 | CR to 36.113: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907046 | CR to 36.141: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907047 | CR to 37.104: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907048 | CR to 37.141: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907049 | On new Capability Sets in MSR specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907050 | CR to 37.141: Simplification of capability sets definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907051 | CR to 37.141: Simplification of capability sets definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907052 | CR to 37.141: Simplification of capability sets definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907053 | CR to 37.141: Simplification of capability sets definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907054 | CR to 38.104: Introduction of n48 | Nokia | imported from 3GU |
R4‑1907055 | CR to 38.141-1: Introduction of n48 | Nokia | imported from 3GU |
R4‑1907056 | Draft CR to 38.141-1: Removal of n48 in Rel’15 | Nokia | imported from 3GU |
R4‑1907057 | Draft CR for 38.101-3: Further UE coexistence table clean-up | Sprint Corporation, SouthernLINC | imported from 3GU |
R4‑1907058 | SAR Proposal for SUL with NR PC2 band | Sprint Corporation, CMCC | imported from 3GU |
R4‑1907059 | Proposal to make 90 MHz CBW mandatory for n41 in Rel-16 | Sprint Corporation | imported from 3GU |
R4‑1907060 | B41.n41 Spectrum Sharing proposal | Sprint Corporation | imported from 3GU |
R4‑1907061 | Draft LS to RAN2 on tdd-7p5kHz UL Shift | Sprint Corporation | imported from 3GU |
R4‑1907062 | Draft CR for 38.101-3: Removal of unnecessarly ACLR notes | Sprint Corporation | imported from 3GU |
R4‑1907063 | Draft CR for 38.101-3: Global replacement of LTE with E-UTRA | Sprint Corporation | imported from 3GU |
R4‑1907064 | Allocation based A-MPR for B41/n41 EN-DC | Sprint Corporation | imported from 3GU |
R4‑1907065 | Additional A-MPR curve for B41/n41 EN-DC | Sprint Corporation | imported from 3GU |
R4‑1907066 | Modified A-MPR behavior for B41/n41 EN-DC | Sprint Corporation | imported from 3GU |
R4‑1907067 | Revised Workplan for the 29 dBm HPUE WID | Sprint Corporation | imported from 3GU |
R4‑1907068 | SAR proposal for 29 dBm HPUE | Sprint Corporation | imported from 3GU |
R4‑1907069 | on 7-24GHz UE RF requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1907070 | Correction in SDL bands requirements applicability (sections 3.5.2, 3.6.5, and B.2.6) | Ericsson | imported from 3GU |
R4‑1907071 | Adding SDL band group in test cases (sections A.4.7 and A.6.7) | Ericsson | imported from 3GU |
R4‑1907072 | Adding missing bands in the bands grouping | Ericsson | imported from 3GU |
R4‑1907073 | Adding missing bands in the bands grouping | Ericsson | imported from 3GU |
R4‑1907074 | On remaining issues for inter-RAT RSTD measurements | Ericsson | imported from 3GU |
R4‑1907075 | E-UTRAN time acquisition requirements for E-UTRA FDD RSTD measurements (section 9.4.4) | Ericsson | imported from 3GU |
R4‑1907076 | E-UTRAN time acquisition requirements for E-UTRA TDD RSTD measurements (section 9.4.4) | Ericsson | imported from 3GU |
R4‑1907077 | Clean-up in inter-RAT measurement requirements (section 9.4) | Ericsson | imported from 3GU |
R4‑1907078 | Introduction of inter-RAT measurement requirements for late-drop deployments (section 9.4) | Ericsson | imported from 3GU |
R4‑1907079 | RSTD requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1907080 | RSTD requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1907081 | Split of the NR editorial work | Ericsson | imported from 3GU |
R4‑1907082 | Analysis of RRM requirements for NR-U Scenario A | Ericsson | imported from 3GU |
R4‑1907083 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1907084 | Response LS clarification about CSI-RS measurement | Ericsson | imported from 3GU |
R4‑1907085 | SUL in UE measurements capability (Section 3.6.2) | Ericsson | imported from 3GU |
R4‑1907086 | NGEN-DC requirements applicability (section 3.6) | Ericsson | imported from 3GU |
R4‑1907087 | Adding missing UE Rx-Tx time difference measurement mapping for TDD | Ericsson | imported from 3GU |
R4‑1907088 | Adding missing UE Rx-Tx time difference measurement mapping for TDD | Ericsson | imported from 3GU |
R4‑1907089 | Adding missing UE Rx-Tx time difference measurement mapping for TDD | Ericsson | imported from 3GU |
R4‑1907090 | On RRM requirements impact for HST | Ericsson | imported from 3GU |
R4‑1907091 | WF on RRM requirements for HST | Ericsson | imported from 3GU |
R4‑1907092 | RRM requirements impact for HST (sections 3.6, 4.2, 9.2, 9.3, 9.5, 8.1, and 8.5) | Ericsson | imported from 3GU |
R4‑1907093 | On reporting criteria and inter-RAT requirements in EN-DC and NE-DC | Ericsson | imported from 3GU |
R4‑1907094 | Reporting criteria for NE-DC and EN-DC (section 9.1.4) | Ericsson | imported from 3GU |
R4‑1907095 | Reporting criteria for NE-DC and EN-DC | Ericsson | imported from 3GU |
R4‑1907096 | Reporting criteria for NE-DC and EN-DC | Ericsson | imported from 3GU |
R4‑1907097 | Response LS on reporting criteria limitation in MR-DC | Ericsson | imported from 3GU |
R4‑1907098 | band plan for NR-U in 6GHz | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907099 | Band plan and channelization for NR-U in 5GHz | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907100 | WF for NR-U Band plan work | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907101 | TP for TR 38.887 | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907102 | TP for TR 38.887: Regulatory situation in 37-43.5 GHz frequency range | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907103 | Discussion on Compatibility and sharing studies in 39.5-43.5 GHz range | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907104 | CR to exclude 100kHz for NBIOT for B26 band edge operation | Qualcomm Inc. | imported from 3GU |
R4‑1907105 | WF for Introduction of band n259 WI | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907106 | Aligning RBG mapping for resource allocation type 0 | Huawei, HiSilicon | imported from 3GU |
R4‑1907107 | MU analysis of interpolation near the pole for TRP grids | ROHDE & SCHWARZ | imported from 3GU |
R4‑1907108 | Reply LS on wideband carrier operation for NR-U | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907109 | CDL modification proposal | Spirent Communications | imported from 3GU |
R4‑1907110 | Draft CR to TS 38.104: correction of the fundamental frequency limit of 2.55GHz for the spurious emissions | Huawei | imported from 3GU |
R4‑1907111 | Draft CR to TS 38.141-1: correction of the fundamental frequency limit of 2.55GHz for the spurious emissions | Huawei | imported from 3GU |
R4‑1907112 | Draft CR to TS 38.141-2: correction of the fundamental frequency limit of 2.55GHz for the spurious emissions | Huawei | imported from 3GU |
R4‑1907113 | Corrections to Pcmax for EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1907114 | EN-DC emission sensitivity to power backoff | Qualcomm Incorporated | imported from 3GU |
R4‑1907115 | Maximum output power for UL MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑1907116 | Reply LS on MOP for UL MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑1907117 | NR-U UE power class and PA calibration | Qualcomm Incorporated | imported from 3GU |
R4‑1907118 | SAR mitigation for PC2 FDD-TDD EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1907119 | SAR mitigation for PC2 TDD-TDD EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1907120 | Modification of reference sensitivity and general spurious emissions in 38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1907121 | [Draft] Reply LS on applicability of LTE anchor agnostic to specific RF test cases | Qualcomm Incorporated | imported from 3GU |
R4‑1907122 | Half duplex for PC2 in 450 MHz bands | Qualcomm Incorporated | imported from 3GU |
R4‑1907123 | Draft CR for TR38.810 – Interpolation near the pole for TRP grids | ROHDE & SCHWARZ | imported from 3GU |
R4‑1907124 | Emission Mask Considerations for single wideband carrier operation modes | Charter Communications, Inc | imported from 3GU |
R4‑1907125 | Views on Noc and Es for NR FR1 UE Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1907126 | Discussions on RRM requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1907127 | On FR2 PC4 Refsens | Qualcomm Incorporated | imported from 3GU |
R4‑1907128 | Draft CR to 38.101-2: Insert definitions | Qualcomm Incorporated | imported from 3GU |
R4‑1907129 | Discussion on Transient Time Related Requirements and Tests | Skyworks Solutions Inc. | imported from 3GU |
R4‑1907130 | Draft CR to 38.101-3. Revise MSD for DC_20A-n8A | Qualcomm Incorporated | imported from 3GU |
R4‑1907131 | Draft CR to 38.101-1. Clarification to FR1 NS_43 AMPR frequency ranges | Qualcomm Incorporated | imported from 3GU |
R4‑1907132 | Draft CR to 38.101-1. Clarify all RB reference so transmission BW applies for all SCS | Qualcomm Incorporated | imported from 3GU |
R4‑1907133 | NR PDSCH SDR Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1907134 | Issues with OOBB exceptions | Apple | imported from 3GU |
R4‑1907135 | Draft CR to 38.101-1 rel. 15 to fix missing Exceptions for Out-of-band Blocking | Apple | imported from 3GU |
R4‑1907136 | Draft CR to 38.101-3 rel. 15 to fix missing Exceptions for Out-of-band Blocking | Apple | imported from 3GU |
R4‑1907137 | Draft CR to 38.101-3 rel. 15 to fix missing SUO note | Apple | imported from 3GU |
R4‑1907138 | Consolidation of mmWave CA combinations | Apple | imported from 3GU |
R4‑1907139 | Applicability of conducted requirement types to frequencies in the range of 7-24 GHz | Apple Inc. | imported from 3GU |
R4‑1907140 | Remaining issues with the beam correspondence requirement | Apple Inc. | imported from 3GU |
R4‑1907141 | CR to 38.817-01 to align system level simulation assumptions with MPR definition | Apple Inc. | imported from 3GU |
R4‑1907142 | Draft CR to 38.101-2 to implement multi-band factors for n257+n261 case | Apple Inc. | imported from 3GU |
R4‑1907143 | Verification of emulated DL signal quality for FR1 MIMO OTA | Apple Inc. | imported from 3GU |
R4‑1907144 | Views on FR1 MIMO OTA testing conditions | Apple Inc. | imported from 3GU |
R4‑1907145 | Evaluation of TPC convergence based on latest agreements | Apple Inc. | imported from 3GU |
R4‑1907146 | Draft CR to 38.101-2 on UL RMC slot patterns | Apple Inc. | imported from 3GU |
R4‑1907147 | New SID on study on enhanced test methods for FR2 UEs | Apple Inc. | imported from 3GU |
R4‑1907148 | Motivation for the study on enhanced test methods for FR2 | Apple Inc. | imported from 3GU |
R4‑1907149 | Views on UE OTA performance requirement derivation for Band n259 | Apple Inc. | imported from 3GU |
R4‑1907150 | CR to 38.817-01 to capture outcome of beam correspondence | Apple Inc. | imported from 3GU |
R4‑1907151 | Views on NR UE CSI Reporting Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1907152 | Draft CR to 38.101-1. Correct and complete FR1 NBB Offsets for NR bands < 2.7GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1907153 | Draft CR on Noc and Es for FR1 requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1907154 | Narrow Band Blocking | Qualcomm Incorporated | imported from 3GU |
R4‑1907155 | Revisit MSD for DC_20A-n8A | Qualcomm Incorporated | imported from 3GU |
R4‑1907156 | Draft CR for TS 38.104: Correction on EVM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907157 | NR PRACH for high speed in Rel.15 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907158 | Draft CR for TS 38.104: Introduction of PRACH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907159 | Draft CR for TS 38.141-1: Introduction of PRACH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907160 | Draft CR for TS 38.141-2: Introduction of PRACH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907161 | Overlapped MPRWT, MPRnarrow boundaries for FR2 PC3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1907162 | n14 A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1907163 | FR2 PC3 MPR PA Measurements for DFT-S-OFDM and CP-OFDM for Rel-16 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1907164 | WF on UE demod in Rel16 LTE HST | Qualcomm Incorporated | imported from 3GU |
R4‑1907165 | DC_(n)71AA Reference Sensitivity Test Conditions for REL-16 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1907166 | Discussion paper on NR-U UL RRM | Qualcomm UK Ltd | imported from 3GU |
R4‑1907167 | n41 A-MPR for N-star (Japan) | Qualcomm Incorporated | imported from 3GU |
R4‑1907168 | n7 new channel bandwidths AMPR for B38 protection | Qualcomm Incorporated | imported from 3GU |
R4‑1907169 | Channel Model Scaling in FR1 and FR2 | Qualcomm UK Ltd | imported from 3GU |
R4‑1907170 | Channel Models for 7-24GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1907171 | Discussion paper on Necessity of SSB based Beam Failure Detection Requirements | Qualcomm UK Ltd | imported from 3GU |
R4‑1907172 | Finalizing UE capability maxUplinkDutyCycle for FR2 | Intel Corporation | imported from 3GU |
R4‑1907173 | FR2 power classes and UE types | Intel Corporation | imported from 3GU |
R4‑1907174 | On multi-band relaxation | Intel Corporation | imported from 3GU |
R4‑1907175 | Views on FR2 test methodologies | Intel Corporation | imported from 3GU |
R4‑1907176 | Finalizing UE capability maxUplinkDutyCycle for FR2 | Intel Corporation | imported from 3GU |
R4‑1907177 | FR2 power classes and UE types | Intel Corporation | imported from 3GU |
R4‑1907178 | On multi-band relaxation | Intel Corporation | imported from 3GU |
R4‑1907179 | Views on FR2 test methodologies | Intel Corporation | imported from 3GU |
R4‑1907180 | Requirements of simultaneous reception of SSB and CSI-RS in FR2 | Qualcomm UK Ltd | imported from 3GU |
R4‑1907181 | Draft CR for 38.101-3: Removal of unnecessary ACLR notes | Sprint Corporation | imported from 3GU |
R4‑1907182 | Requirements of simultaneous reception of SSB and CSI-RS in FR1 and FR2 | Qualcomm UK Ltd | imported from 3GU |
R4‑1907183 | IAB node radio transmission and reception | Qualcomm UK Ltd | imported from 3GU |
R4‑1907184 | OTA timing alignment for IAB Networks | Qualcomm UK Ltd | imported from 3GU |
R4‑1907185 | Reply LS on OTA timing alignment for IAB | Qualcomm UK Ltd | imported from 3GU |
R4‑1907186 | Transmission and Measurement of Synchronization Signals in IAB Networks | Qualcomm UK Ltd | imported from 3GU |
R4‑1907187 | Workplan for IAB WI | Qualcomm UK Ltd | imported from 3GU |
R4‑1907188 | Draft CR to REL-16 TS 38.101-2: addition of NR intra band CA n257C configuration | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑1907189 | Draft CR to REL-16 TS 38.101-3: addition of EN DC 3A-n257B and 3A-n257C configurations | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑1907190 | Discussion on PUR serving cell RSRP change attribute for MTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907191 | On work prioritization for WI NR RF requirements for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1907192 | Discussion on PUR serving cell NRSRP change attribute for NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907193 | Way forward on Noc and Es values for UE demodulation performance requirements | Intel | imported from 3GU |
R4‑1907194 | Draft CR on Noc and Es setup | Intel Corporation, Anritsu | imported from 3GU |
R4‑1907195 | Reply LS on capability of measurement gap patterns | Intel Corporation | imported from 3GU |
R4‑1907196 | CR on TS38.133 for gap pattern signaling (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1907197 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1907198 | E-UTRAN time acquisition requirements for E-UTRA FDD RSTD measurements (section 9.4.4) | Ericsson | imported from 3GU |
R4‑1907199 | CR for inter-RAT RSTD measurement on TDD E-UTRA carrier (section 9.4.4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1907200 | CR on reselection criterion in idle mode (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907201 | CR on reselection criterion in inter-RAT NR measurements (36.133-rel15) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907202 | [draft] Correction CR on the reference cell for deriving the UE transmit timing | NTT DOCOMO, INC | imported from 3GU |
R4‑1907203 | Way forward on UE timing adjustment with Beam switching | Ericsson, Intel, Mediatek, Nokia, Nokia Shanghai Bell, Qualcomm | imported from 3GU |
R4‑1907204 | UE Transmit Timing Requirements under Beam Switch (7.1.2) | Ericsson, Intel, Mediatek, Nokia, Nokia Shangai Bell | imported from 3GU |
R4‑1907205 | Draft CR on maintaining MTTD requirements for intra-band sync EN-DC (section 7.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1907206 | Updated reply LS on intra-band combination for NR-CA and MR-DC | Intel Corporation | imported from 3GU |
R4‑1907207 | CR section 8.1.2.3, 8.1.3.3 Requirement for simultaneous SSB and CSI-RS RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907208 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1907209 | PSCell addition delay in FR2 36.133 rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907210 | CR on PSCell addition delay R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1907211 | PSCell addition delay in FR2 38.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907212 | Draft CR to 38.133 on TCI State Switching Requirements (Section 8.10) | Intel Corporation | imported from 3GU |
R4‑1907213 | CR on interruption due to TCI state switching | CATT | imported from 3GU |
R4‑1907214 | Reply LS on RRC processing delay for BWP switching | Huawei, HiSilicon | imported from 3GU |
R4‑1907215 | CR section 8.2 Corrections on interruption requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907216 | DraftCR on measurement restrictions for candidate beam detection (section 8.5.5 and 8.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1907217 | Corrections to measurement restrictions and UE requirements in sections 8.5.3, 8.5.4, 8.5.5 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907218 | CR on handling of L1-RSRP measurement RS FDMed with other RS (section 9.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1907219 | Correction to UE requirements in section 9.5.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907220 | Correction of incorrect RS abbreviation (section 9.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907221 | Reply LS on clarification of CSI-RS based RRM measurement | ZTE | imported from 3GU |
R4‑1907222 | CR to 36.133 on SFTD accuracy | ZTE | imported from 3GU |
R4‑1907223 | Simulation results for SRS-RSRP measurements | Ericsson | imported from 3GU |
R4‑1907224 | draft CR of conditions for Y and Z for FR2 PC2 (section B.2) | LG Electronics Inc. | imported from 3GU |
R4‑1907225 | CR to add FR2 side conditions for RSRQ and SINR (section 10.1.8/10/13/15) | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑1907226 | CR to update side conditions for L1-RSRP accuracy (section 10.1.19/20) | Huawei, HiSilicon | imported from 3GU |
R4‑1907227 | CR 38.133 (10.1.20) L1-RSRP accuracy requirements for FR2 | Ericsson | imported from 3GU |
R4‑1907228 | Correct Inter-frequency Measurement condition | ANRITSU LTD | imported from 3GU |
R4‑1907229 | Draft CR on TS38.133 for modified parameters for RLM testing with 4 RX antenna connection (section A.3.6.1) | CMCC, Huawei, HiSilicon | imported from 3GU |
R4‑1907230 | draftCR on TCI state configurations for test cases (section A.3.16) | Huawei, HiSilicon | imported from 3GU |
R4‑1907231 | draft CR of Y and Z for FR2 power class 2(TR38.810) | LG Electronics Inc. | imported from 3GU |
R4‑1907232 | CR for Applicability in intra-band FR2 | MediaTek inc. | imported from 3GU |
R4‑1907233 | Ad hoc minutes on FR2 RRM test setup | Ericsson | imported from 3GU |
R4‑1907234 | Ad hoc minutes on NR RRM test cases | Huawei | imported from 3GU |
R4‑1907235 | Ad hoc minutes for NR UE demodulation performance requirements | Samsung | imported from 3GU |
R4‑1907236 | Ad hoc minutes for Rel-15 NR demodulation leftover topics and Rel-16 new topics | Intel | imported from 3GU |
R4‑1907237 | Ad hoc minutes for BS demodulation performance requirements | China Telecom | imported from 3GU |
R4‑1907238 | Summary of ideal and impairment results for NR BS HST | NTT DOCOMO | imported from 3GU |
R4‑1907239 | Way forward on general part of NR BS demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1907240 | Way forward on performance requirements of UCI multiplexing on PUSCH | Samsung | imported from 3GU |
R4‑1907241 | Way forward on NR PUSCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907242 | Way forward for multi-slot PUCCH performance requirements | ZTE | imported from 3GU |
R4‑1907243 | Way forward on high speed related requirements for NR BS demodulation in Rel-15 | NTT DOCOMO | imported from 3GU |
R4‑1907244 | Draft CR to TS 38.141-1: Update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1907245 | Draft CR to TS 38.141-2: Update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1907246 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1907247 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1907248 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1907249 | Draft CR to TS 38.104: Correction on the terminology in PUSCH FRC tables | China Telecom | imported from 3GU |
R4‑1907250 | Draft CR to TS 38.141-1: Correction on the terminology in PUSCH FRC tables | China Telecom | imported from 3GU |
R4‑1907251 | Draft CR to TS 38.141-2: Correction on the terminology in PUSCH FRC tables | China Telecom | imported from 3GU |
R4‑1907252 | Draft CR to TS38.104: Updates of PRACH performance requirements | CATT | imported from 3GU |
R4‑1907253 | Draft CR to TS38.141-1: Updates of PRACH performance requirements | CATT | imported from 3GU |
R4‑1907254 | Draft CR to TS38.141-2: Updates of PRACH performance requirements | CATT | imported from 3GU |
R4‑1907255 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1907256 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1907257 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1907258 | Draft CR on NR UCI on PUSCH performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1907259 | Draft CR on NR UCI on PUSCH conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1907260 | Draft CR on NR UCI on PUSCH radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1907261 | draftCR: Updates to PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1907262 | draftCR: Updates to PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1907263 | draftCR: Updates to PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1907264 | Draft CR on TS 38.141-1 Conducted test requirements for PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907265 | Draft CR on TS 38.141-2 Radiated test requirements for PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907266 | Draft CR on TS 38.104 Performance requirement for PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907267 | Draft CR on TS 38.104 Performance requirement for multi-slot PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907268 | Draft CR on TS 38.141-1 Conducted test requirements for multi-slot PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907269 | Draft CR on TS 38.141-2 Radiated test requirements for multi-slot PUCCH format 1 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907270 | Draft CR to TS 38.141-1 Manufacturer declaration for BS demodulation | Ericsson | imported from 3GU |
R4‑1907271 | Draft CR to TS 38.141-2 Manufacturer declaration for BS demodulation | Ericsson | imported from 3GU |
R4‑1907272 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1907273 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1907274 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1907275 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1907276 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1907277 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907278 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907279 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907280 | Draft CR for TS 38.104: Introduction of PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907281 | Draft CR for TS 38.141-1: Introduction of PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907282 | Draft CR for TS 38.141-2: Introduction of PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907283 | Draft CR for TS 38.104: Introduction of PRACH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907284 | Draft CR for TS 38.141-1: Introduction of PRACH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907285 | Draft CR for TS 38.141-2: Introduction of PRACH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907286 | Updated simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1907287 | Updated simulation results for NR PUSCH | Samsung | imported from 3GU |
R4‑1907288 | Simulation results for NR BS demodulation | CATT | imported from 3GU |
R4‑1907289 | Simulation results for PRACH restricted set | CATT | imported from 3GU |
R4‑1907290 | Discuss on HST demodulation requirements for Rel-15 NR BS | Huawei, HiSilicon | imported from 3GU |
R4‑1907291 | BS demodulation simulations results for UCI on PUSCH | Ericsson | imported from 3GU |
R4‑1907292 | HST for NR BS demod in Rel-15 - PRACH considerations | Ericsson | imported from 3GU |
R4‑1907293 | Draft CR to TS38.101-4 for FR2 SDR test cases | Qualcomm | imported from 3GU |
R4‑1907294 | draftCR: Introduce single-tap HST channel model in TS 38.101-4 | Huawei, HiSilicon | imported from 3GU |
R4‑1907295 | draftCR: updates to FR2 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1907296 | draftCR: updates to FRC for demodulation performance | Huawei,HiSilicon,Ericsson | imported from 3GU |
R4‑1907297 | draftCR: updates to FR1 CQI reporting test cases in section 6.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1907298 | Draft CR to 38.101-4 on Applicability of requirements | Intel Corporation | imported from 3GU |
R4‑1907299 | Draft CR to 38.101-4 on Demodulation requirements for interworking | Intel Corporation | imported from 3GU |
R4‑1907300 | Draft CR to 38.101-4 on CSI requirements for interworking | Intel Corporation | imported from 3GU |
R4‑1907301 | Draft CR on FR1 normal PDSCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1907302 | Draft CR on PDSCH FRC | Intel Corporation | imported from 3GU |
R4‑1907303 | Draft CR on FR2 CSI Reporting tests | Qualcomm Incorporated | imported from 3GU |
R4‑1907304 | Editorial corrections for 38.101-4 PDCCH tables | Ericsson | imported from 3GU |
R4‑1907305 | Ad hoc minutes for NR signal characteristics | Intel | imported from 3GU |
R4‑1907306 | Ad hoc minutes for NR measurement and gap | Ericsson | imported from 3GU |
R4‑1907307 | draftCR: updates to FR1 PDSCH test parameters | Huawei, HiSilicon | imported from 3GU |
R4‑1907308 | Draft CR on EN-DC SDR requirements | Intel Corporation | imported from 3GU |
R4‑1907309 | Draft CR to TS38.101-4 on adding FRC for sub-band CQI test cases | Samsung | imported from 3GU |
R4‑1907310 | Draft CR to TS38.101-4: Environmental conditions (Annex E) | CATT | imported from 3GU |
R4‑1907311 | Way forward on Rel-15 NR demodulation leftover topics and Rel-16 new topics | Intel | imported from 3GU |
R4‑1907312 | Correction of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1907313 | Correction of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1907314 | draft CR of conditions for Y and Z for FR2 PC2 (section B.2) | LG Electronics Inc. | imported from 3GU |
R4‑1907315 | Draft CR on SDR requirements for NR CA between FR1 and FR2 | Intel Corporation | imported from 3GU |
R4‑1907316 | Way forward on reporting criteria limitation in MR-DC | Samsung | imported from 3GU |
R4‑1907317 | CR to add FR2 side condition for SFTD for NE-DC (section 10.1.21) | Huawei, HiSilicon | imported from 3GU |
R4‑1907318 | Maintenance of PSCell addition requirements for NR-DC (section 8.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1907319 | Reply LS on SFTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1907320 | Draft CR to 38.133 for SFTD accuracy requirements for NR DC (section 10.21.1.2) | ZTE | imported from 3GU |
R4‑1907321 | CR on TDD inter frequency idle RSTD accuracy test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1907322 | endorsed CR for serving cell RRM measurement relaxation test case R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1907323 | Maintenance on TDD inter-frequency re-establishment test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1907324 | CR introducing test cases for direct activation of Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907325 | Maintenance on HD-FDD inter-frequency re-establishment test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1907326 | CR on threshold for FS3 RSSI and channel occupancy tests R13 | MediaTek inc. | imported from 3GU |
R4‑1907327 | Draft CR on TS38.133 for Intrafrequency cell identification (section 9.2.5.1) | CMCC | imported from 3GU |
R4‑1907328 | CR on scheduling restriction on intra-frequency measurement (section 9.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1907329 | CR on TS38.133 for definition of detectable cell (Section 9.2.4.3, Section 9.3.6.3) | MediaTek inc. | imported from 3GU |
R4‑1907330 | CR for CSI-RS based radio link monitoring | MediaTek inc. | imported from 3GU |
R4‑1907331 | WF on RRM requirements for NR-U | Ericsson | imported from 3GU |
R4‑1907332 | Maintenance draftCR on re-establishment test cases for FR1 (A.6.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1907333 | Maintenance draftCR on re-establishment test cases for FR2 (A.7.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1907334 | Draft CR to TS38.133 on adding FR2 OTA test setup for random access test (Section A.5.3.2.2, A.7.3.2.2) | Samsung R&D Institute UK | imported from 3GU |
R4‑1907335 | Draft CR to TS38.133 on correction of EN-DC UE tramsmit timing tests (Section A.4.4.1, A.5.4.1) | Samsung | imported from 3GU |
R4‑1907336 | Draft CR to TS38.133 on correction of SA UE tramsmit timing tests (Section A.6.4.1, A.7.4.1) | Samsung R&D Institute UK | imported from 3GU |
R4‑1907337 | CR on RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1907338 | CR on RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1907339 | TC EN-DC CSI-based RLM in FR1 (A.4.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907340 | TC EN-DC CSI-based RLM in FR2 (A.5.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907341 | Maintenance draftCR on RLM scheduling restriction test cases in FR2 (A.5.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1907342 | Test case for SA RLM scheduling restriction in FR2 (A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1907343 | Updates to test cases for interruptions at transitions in EN-DC (section A.4.5.2.1, A.4.5.2.2, A.5.5.2.1 and A.5.5.2.2) | CATT | imported from 3GU |
R4‑1907344 | Updates to test cases for interruption due to deactivated SCell operations in EN-DC (Section A.4.5.2 and A.5.5.2) | CATT | imported from 3GU |
R4‑1907345 | Update to test cases for SCell activation/deactivation in SA (section A.6.5.3 and A.7.5.3) | CATT | imported from 3GU |
R4‑1907346 | TC EN-DC SCell activation delay in FR1 (A.4.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907347 | TC EN-DC SCell activation delay in FR2 (A.5.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907348 | draftCR on TS38.133 for BWP switch test case(section A.5.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1907349 | draftCR on TS38.133 for BWP switch test case(section A.7.5.6.1) | MediaTek inc. | imported from 3GU |
R4‑1907350 | TC A.5.5.6.2.1 EN-DC FR2 DL active RRC-BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907351 | TC A.7.5.6.2.1 SA FR2 DL active RRC-BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907352 | Correction on test case of UL carrier reconfiguration delay in ENDC (section A.4.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907353 | Correction on test case of UL carrier reconfiguration delay in SA (section A.6.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907354 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR1 for EN-DC (Section A.4.5.5) | Intel Corporation | imported from 3GU |
R4‑1907355 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR2 for EN-DC (Section A.5.5.5) | Intel Corporation | imported from 3GU |
R4‑1907356 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR1 for SA (Section A.6.5.5) | Intel Corporation | imported from 3GU |
R4‑1907357 | Draft CR to 38.133 on Testcases for Beam failure detection and Link recovery procedures in FR2 for SA (Section A.7.5.5) | Intel Corporation | imported from 3GU |
R4‑1907358 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 (section A.4.5.5.3 and A.4.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907359 | DraftCR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 (section A.5.5.5.3 and A.5.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907360 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 (section A.6.5.5.3 and A.6.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907361 | DraftCR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 (section A.7.5.5.3 and A.7.5.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907362 | TC scheduling restriction during SSB based BFD and LR in FR2 in EN-DC (A.5.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907363 | TC scheduling restriction during SSB based BFD and LR in FR2 in SA (A.7.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907364 | Maintenance draftCR on the intra-frequency cell search and measurement test cases for FR2 (section A.5.6.1 A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1907365 | Correction of test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Ericsson | imported from 3GU |
R4‑1907366 | Correction of test cases for inter-frequency measurement in SA in FR1 (section A.6.6.2) | Ericsson | imported from 3GU |
R4‑1907367 | Maintenance draftCR on inter-RAT measurement test cases for FR1 (section A.6.6.3.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1907368 | Test case updates for FR1 intrafrequency RSRP accuracy in EN-DC, section A.4.7.1.1 | Ericsson | imported from 3GU |
R4‑1907369 | Test case updates for FR1 intrafrequency RSRP accuracy in SA, section A.4.6.1.1 | Ericsson | imported from 3GU |
R4‑1907370 | Test case updates for FR2 intrafrequency RSRP accuracy in EN-DC, section A.5.7.1.1 | Ericsson | imported from 3GU |
R4‑1907371 | Test case updates for FR2 intrafrequency RSRP accuracy in SA, section A.4.7.1.1 | Ericsson | imported from 3GU |
R4‑1907372 | Maintanance of inter-frequency RSRP accuracy test cases for FR1 (section A.4.7.1.2, A.6.7.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1907373 | Maintanance of inter-frequency RSRP accuracy test cases for FR2 (section A.5.7.1.2-3, A.7.7.1.2-3) | Huawei, HiSilicon | imported from 3GU |
R4‑1907374 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR2 (Section A.5.7.3) | MediaTek inc. | imported from 3GU |
R4‑1907375 | CR on TS38.133 for SA SS-SINR tests with PSCell in FR2 (Section A.7.7.3) | MediaTek inc. | imported from 3GU |
R4‑1907376 | Maintanance of L1-RSRP accuracy test cases for FR2 (section A.5.7.4, A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907377 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case without SSB index and non-DRX in FR2 (A.8.4.2.5) | Ericsson | imported from 3GU |
R4‑1907378 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case without SSB index and in DRX in FR2 (A.8.4.2.6) | Ericsson | imported from 3GU |
R4‑1907379 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case with SSB index and non-DRX in FR2 (A.8.4.2.7) | Ericsson | imported from 3GU |
R4‑1907380 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case with SSB index and in DRX in FR2 (A.8.4.2.8) | Ericsson | imported from 3GU |
R4‑1907381 | draftCR for E-UTRAN inter-RAT NR handover (section A.8.3) | Intel Corporation | imported from 3GU |
R4‑1907382 | CR on TS38.133 E-UTRAN – NR inter-RAT measurements test case with FR1 target cell and FR2 target cell (Section A.8.5.2) | MediaTek inc. | imported from 3GU |
R4‑1907383 | Way forward on CLI measuremen | LGE | imported from 3GU |
R4‑1907384 | Draft LS on RSSI measurements for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1907385 | Way forward on CLI measuremen | LGE | imported from 3GU |
R4‑1907386 | LS to RAN2 on SRS-RSRP measurement resource configuration | LG Electronics Inc. | imported from 3GU |
R4‑1907387 | LS on clarification of UE capability for FDMed between PDSCH and CLI measurement resource | LG Electronics Inc. | imported from 3GU |
R4‑1907388 | Way forward on Rel-15 NB-IOT NPRACH demodulation requirements | Ericsson, Huawei, Nokia | imported from 3GU |
R4‑1907389 | Way forward on FR2 RRM RMC for 2AoA test setup | Ericsson | imported from 3GU |
R4‑1907390 | CR 38.133 (A.3.2) OCNG for 2AoA setup | Ericsson | imported from 3GU |
R4‑1907391 | Way forward on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1907392 | Simulation assumption for SRS-RSRP measurement requirement | LGE | imported from 3GU |
R4‑1907393 | TP for TR 37.716-21-11 to include DC_7_n3-n78 | Ericsson, Swisscom | imported from 3GU |
R4‑1907394 | TP for TR 36.716-04-01: CA_2A-7A-29A-66A, CA_2A-7C-29A-66A, CA_2A-7A-7A-29A-66A | Huawei, HiSilicon | imported from 3GU |
R4‑1907395 | TP for TR 36.716-02-02 to include LTE CA_2-48 with 2-48 UL | Ericsson, Verizon | imported from 3GU |
R4‑1907396 | TP for TR 36.716-02-02 to include LTE CA_48-66 with 48-66 UL | Ericsson, Verizon | imported from 3GU |
R4‑1907397 | TP for TR 37.716-21-11 to include MSD for DC_1A-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1907398 | TP for TR 37.716-21-11 to include MSD for DC_7A-28A_n5A, 7C-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1907399 | TP to TR 38.716-02-00 CA_n78-n257 with 2UL | LG Uplus | imported from 3GU |
R4‑1907400 | Draft CR to TS 38.101-1 Rel16:_introducing CA_n39A-n41C and CA_n39A-n41(2A) with 1UL and 2UL | ZTE Corporation, | imported from 3GU |
R4‑1907401 | TP for TR37.716-21-11 for DC_2A-13A_n66A | MediaTek Inc. | imported from 3GU |
R4‑1907402 | Correction TP for TR37.716-11-11 for DC_66A_n25A | MediaTek Inc. | imported from 3GU |
R4‑1907403 | TP for TR 37.716-11-11: DC_1_n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1907404 | TP for TR 37.716-11-11: DC_3_n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1907405 | TP for TR 38.716-02-00 to include CA_n1-n28 | Ericsson, BT plc | imported from 3GU |
R4‑1907406 | TP for TR 38.716-02-00 to include CA_n20-n28 | Ericsson, BT plc | imported from 3GU |
R4‑1907407 | Meeting minutes for intra-band EN-DC ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1907408 | FR2 TPC adhoc minutes | Apple Inc. | imported from 3GU |
R4‑1907409 | NSA FDD-TDD HPUE adhoc minutes | CHTTL | imported from 3GU |
R4‑1907410 | CR to Rel-14 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1907411 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1907412 | CR of adding LTE B42/B43 for UE category NB1 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1907413 | CR of adding LTE B42/B43 for UE category NB1/NB2 in R16 | Ericsson, Softbank | imported from 3GU |
R4‑1907414 | TP for TR 36.716-02-02 Introduction of CA_4-28 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907415 | TP for TR 36.716-02-02 Introduction of CA_13-66 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907416 | TP for TR 36.716-02-02 Introduction of CA_14-30 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907417 | TP for TR 36.716-02-02 Introduction of CA_14-66 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907418 | LS response to transient period for antenna switching or frequency hopping | Qualcomm Inc. | imported from 3GU |
R4‑1907419 | Draft CR for TS 38.101-1: Editorial improvement to EVM equalizer spectrum flatness requirements for Pi/2 BPSK | MediaTek Inc. | imported from 3GU |
R4‑1907420 | draft CR of simple application for FR2 PC2 and 4 requirements with PC3 same requirements | LG Electronics Inc. | imported from 3GU |
R4‑1907421 | void | void | imported from 3GU |
R4‑1907422 | Draft CR for TS 38.101-1 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1907423 | Draft CR for TS 38.101-2 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1907424 | Draft CR for clarification of note for B42_n77 and B42_n78 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907425 | DraftCR TS 38.101-3 Corrections to Intra-band ENDC MPR text | Skyworks Solutions Inc. | imported from 3GU |
R4‑1907426 | Definition of BCS support in inter-band EN-DC mode | Qualcomm Incorporated | imported from 3GU |
R4‑1907427 | Reply LS on SA Option 2 Core Requirement Dependencies | Huawei, HiSilicon | imported from 3GU |
R4‑1907428 | Meeting minutes for transient period capability ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1907429 | Draft CR to TS38.101-1 A-MPR for Inter-band CA | Intel Corporation | imported from 3GU |
R4‑1907430 | Correction to power control in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1907431 | draft CR for TS 38.101-1 on/off time mask | Huawei, HiSilicon | imported from 3GU |
R4‑1907432 | Narrow Band Blocking | Qualcomm Incorporated | imported from 3GU |
R4‑1907433 | void | void | imported from 3GU |
R4‑1907434 | [Rx]Draft CR for 38.101-1 modifying characteristics of the interfering signal in Annex D | Huawei, HiSilicon | imported from 3GU |
R4‑1907435 | Draft CR to TS38.101-1_introduction of n41C and corrections on Rx requirements for NR intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1907436 | Draft CR to 38.101-2: FR2 CA REFESNS | Qualcomm Incorporated | imported from 3GU |
R4‑1907437 | Draft CR to 38.101-2: Insert definitions | Qualcomm Incorporated | imported from 3GU |
R4‑1907438 | Draft CR for Multi-band relaxation to TS 38.101-2 | DOCOMO Communications Lab. | imported from 3GU |
R4‑1907439 | Draft CR to TS 38.101-1 on CA bandwidth class description | ZTE Corporation | imported from 3GU |
R4‑1907440 | WF on transient period capability | Qualcomm, Ericsson, AT&T, Verizon, Sprint, T-Mobile, Dish, Vodafone, Orange, ZTE, Nokia , Telecom Italia, Deutsche Telekom, NTT DOCOMO, Interdigital, CHTTL | imported from 3GU |
R4‑1907441 | WF on transient period capability | Huawei | imported from 3GU |
R4‑1907442 | Draft CR to 38.101-2: FR2 UE port clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1907443 | Draft CR to TS38.101-2 Complete FR2 MPR/A-MPR | Intel Corporation | imported from 3GU |
R4‑1907444 | Amendment of the relative power tolerance requirement | Ericsson, Qualcomm Incorporated | imported from 3GU |
R4‑1907445 | Correction to Pcmax and Pumax for CA | Ericsson | imported from 3GU |
R4‑1907446 | Draft CR to 38.101-2: FR2 CA REFESNS | Qualcomm Incorporated | imported from 3GU |
R4‑1907447 | Draft CR to 38.101-2 on UL RMC slot patterns | Apple Inc. | imported from 3GU |
R4‑1907448 | Correction to EN-DC spurious emissions | ROHDE & SCHWARZ | imported from 3GU |
R4‑1907449 | CR to TS 38.817-01: Coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 | Nokia, Sprint, Ericsson | imported from 3GU |
R4‑1907450 | WF on PC2 bands 31 and 72 | Nokia | imported from 3GU |
R4‑1907451 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) | CMCC | imported from 3GU |
R4‑1907452 | TP for TR37.825 for SAR requirement | CMCC | imported from 3GU |
R4‑1907453 | WF on NSA FDD-TDD HPUE | CHTTL | imported from 3GU |
R4‑1907454 | Draft CR to TS38.101-2 on FR2 PC3 UE maxUplinkDutyCycle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907455 | TP for 37.716-11-11: MSD for inter-band EN DC_3A-n41A | CATT, CMCC | imported from 3GU |
R4‑1907456 | TP for 38.716-03-01: UE requirements for CA_n3A-n41A-n79A | CATT | imported from 3GU |
R4‑1907457 | TR 38.716-03-01 v0.1.0 | CATT | imported from 3GU |
R4‑1907458 | LS on FR2 maxUplinkdutycycle | Qualcomm Incorporated | imported from 3GU |
R4‑1907459 | Updated TR 37.716-11-11_V0.4.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907460 | TP for TR 38.716-02-00 to include CA_n3A-n8A | ZTE Corporation | imported from 3GU |
R4‑1907461 | TP for TR 37.716-11-11 to include DC_66_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1907462 | TR for EN-DC 4LTE+1NR band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907463 | Draft CR for TS 38.101-1: Corrections to configurations for intra-band non-contiguous CA | MediaTek Inc. | imported from 3GU |
R4‑1907464 | TP for TR 38.716-01-01: CA_n48B and CA_n48C | Samsung | imported from 3GU |
R4‑1907465 | WF on 29 dBm HPUE | Sprint Corporation | imported from 3GU |
R4‑1907466 | Draft CR to 38.101-2: FR2 CA MPR enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1907467 | CR to 38.817-01: FR2 CA MPR explained | Qualcomm Incorporated | imported from 3GU |
R4‑1907468 | Draft CR to 38.101-2: FR2 MPR Wording CleanUp | Qualcomm Incorporated | imported from 3GU |
R4‑1907469 | CR to Rel-15 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1907470 | CR to Rel-16 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1907471 | Draft CR to 38.101-1. Clarify all RB reference so transmission BW applies for all SCS | Qualcomm Incorporated | imported from 3GU |
R4‑1907472 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1907473 | Draft CR to TS38.101-2 on FR2 PC3 UE maxUplinkDutyCycle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907474 | Draft CR for TS 38.101-1 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1907475 | Corrections to MPR/A-MPR and additional requirements for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1907476 | draft CR for TS 38.101-3 intra-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1907477 | Draft CR to TS 38.101-1 on maximum aggregated bandwidth for NR CA configurations | ZTE Corporation | imported from 3GU |
R4‑1907478 | Draft CR to TS 38.101-2 on configurations for intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1907479 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) | CMCC | imported from 3GU |
R4‑1907480 | TR for LTE 3DL/1UL CA Rel-16 | Huawei,HiSilicon | imported from 3GU |
R4‑1907481 | Correction of RefSens exceptions due to UL harmonic interference for NR CA in 38.101-1 | vivo | imported from 3GU |
R4‑1907482 | Correction of RefSens exceptions due to UL harmonic interference for EN-DC in 38.101-3 | vivo | imported from 3GU |
R4‑1907483 | [Rx]Draft CR for 38.101-3 defining Reference sensitivity for intra-band non-contiguous | Huawei, HiSilicon | imported from 3GU |
R4‑1907484 | WF on 29 dBm HPUE | Sprint Corporation | imported from 3GU |
R4‑1907485 | Corrections to MPR/A-MPR and additional requirements for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1907486 | WF on TS 38.101-1 on/off time mask | Ericsson | imported from 3GU |
R4‑1907487 | Revisit MSD for DC_20A-n8A | Qualcomm Incorporated | imported from 3GU |
R4‑1907488 | WF on NSA FDD-TDD HPUE | CHTTL | imported from 3GU |
R4‑1907489 | Draft CR to 38.101-3. Revise MSD for DC_20A-n8A | Qualcomm Incorporated | imported from 3GU |
R4‑1907490 | [Draft] Reply LS on applicability of LTE anchor agnostic to specific RF test cases | Qualcomm Incorporated | imported from 3GU |
R4‑1907491 | Reply LS on applicability of LTE anchor agnostic to specific RF test cases | Qualcomm Incorporated | imported from 3GU |
R4‑1907492 | Modification of reference sensitivity and general spurious emissions in 38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1907493 | Correction to Pcmax and Pumax for CA | Ericsson | imported from 3GU |
R4‑1907494 | WF on transient period capability | Huawei | imported from 3GU |
R4‑1907495 | WF on 29 dBm HPUE | Sprint Corporation | imported from 3GU |
R4‑1907496 | void | void | imported from 3GU |
R4‑1907497 | void | void | imported from 3GU |
R4‑1907498 | void | void | imported from 3GU |
R4‑1907499 | void | void | imported from 3GU |
R4‑1907500 | CR to TS 38.101-1: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Qualcomm Incorporated | imported from 3GU |
R4‑1907501 | CR to TS 38.101-2: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Qualcomm Incorporated | imported from 3GU |
R4‑1907502 | CR to TS 38.101-3: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Qualcomm Incorporated | imported from 3GU |
R4‑1907503 | CR to TS 38.101-4: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Samsung | imported from 3GU |
R4‑1907504 | CR to TS 38.133: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Intel Corporation | imported from 3GU |
R4‑1907505 | CR to TS 38.141-1: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Huawei | imported from 3GU |
R4‑1907506 | CR to TS 38.141-2: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Huawei | imported from 3GU |
R4‑1907507 | CR to TR 38.810: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Intel Corporation | imported from 3GU |
R4‑1907508 | Blocking requirement for MSR/NR operation | Ericsson | imported from 3GU |
R4‑1907509 | CR to 36.133 on SFTD accuracy | ZTE Corporation | imported from 3GU |
R4‑1907510 | RSTD requirements for NE-DC | Ericsson | imported from 3GU |
R4‑1907511 | Reporting criteria for NE-DC and EN-DC | Ericsson | imported from 3GU |
R4‑1907512 | CR introducing test cases for direct activation of Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907513 | CR to 38.817-01: FR2 CA MPR explained | Qualcomm Incorporated | imported from 3GU |
R4‑1907514 | void | void | imported from 3GU |
R4‑1907515 | void | void | imported from 3GU |
R4‑1907516 | void | void | imported from 3GU |
R4‑1907517 | void | void | imported from 3GU |
R4‑1907518 | void | void | imported from 3GU |
R4‑1907519 | void | void | imported from 3GU |
R4‑1907520 | void | void | imported from 3GU |
R4‑1907521 | void | void | imported from 3GU |
R4‑1907522 | void | void | imported from 3GU |
R4‑1907523 | void | void | imported from 3GU |
R4‑1907524 | void | void | imported from 3GU |
R4‑1907525 | void | void | imported from 3GU |
R4‑1907526 | void | void | imported from 3GU |
R4‑1907527 | void | void | imported from 3GU |
R4‑1907528 | void | void | imported from 3GU |
R4‑1907529 | void | void | imported from 3GU |
R4‑1907530 | void | void | imported from 3GU |
R4‑1907531 | void | void | imported from 3GU |
R4‑1907532 | void | void | imported from 3GU |
R4‑1907533 | void | void | imported from 3GU |
R4‑1907534 | void | void | imported from 3GU |
R4‑1907535 | void | void | imported from 3GU |
R4‑1907536 | void | void | imported from 3GU |
R4‑1907537 | void | void | imported from 3GU |
R4‑1907538 | void | void | imported from 3GU |
R4‑1907539 | void | void | imported from 3GU |
R4‑1907540 | void | void | imported from 3GU |
R4‑1907541 | void | void | imported from 3GU |
R4‑1907542 | void | void | imported from 3GU |
R4‑1907543 | void | void | imported from 3GU |
R4‑1907544 | void | void | imported from 3GU |
R4‑1907545 | void | void | imported from 3GU |
R4‑1907546 | void | void | imported from 3GU |
R4‑1907547 | void | void | imported from 3GU |
R4‑1907548 | void | void | imported from 3GU |
R4‑1907549 | void | void | imported from 3GU |
R4‑1907550 | void | void | imported from 3GU |
R4‑1907551 | void | void | imported from 3GU |
R4‑1907552 | void | void | imported from 3GU |
R4‑1907553 | void | void | imported from 3GU |
R4‑1907554 | void | void | imported from 3GU |
R4‑1907555 | void | void | imported from 3GU |
R4‑1907556 | void | void | imported from 3GU |
R4‑1907557 | void | void | imported from 3GU |
R4‑1907558 | void | void | imported from 3GU |
R4‑1907559 | void | void | imported from 3GU |
R4‑1907560 | void | void | imported from 3GU |
R4‑1907561 | void | void | imported from 3GU |
R4‑1907562 | void | void | imported from 3GU |
R4‑1907563 | void | void | imported from 3GU |
R4‑1907564 | void | void | imported from 3GU |
R4‑1907565 | void | void | imported from 3GU |
R4‑1907566 | void | void | imported from 3GU |
R4‑1907567 | void | void | imported from 3GU |
R4‑1907568 | void | void | imported from 3GU |
R4‑1907569 | void | void | imported from 3GU |
R4‑1907570 | void | void | imported from 3GU |
R4‑1907571 | void | void | imported from 3GU |
R4‑1907572 | void | void | imported from 3GU |
R4‑1907573 | void | void | imported from 3GU |
R4‑1907574 | void | void | imported from 3GU |
R4‑1907575 | void | void | imported from 3GU |
R4‑1907576 | void | void | imported from 3GU |
R4‑1907577 | void | void | imported from 3GU |
R4‑1907578 | void | void | imported from 3GU |
R4‑1907579 | void | void | imported from 3GU |
R4‑1907580 | void | void | imported from 3GU |
R4‑1907581 | void | void | imported from 3GU |
R4‑1907582 | void | void | imported from 3GU |
R4‑1907583 | void | void | imported from 3GU |
R4‑1907584 | void | void | imported from 3GU |
R4‑1907585 | void | void | imported from 3GU |
R4‑1907586 | void | void | imported from 3GU |
R4‑1907587 | void | void | imported from 3GU |
R4‑1907588 | void | void | imported from 3GU |
R4‑1907589 | void | void | imported from 3GU |
R4‑1907590 | void | void | imported from 3GU |
R4‑1907591 | void | void | imported from 3GU |
R4‑1907592 | void | void | imported from 3GU |
R4‑1907593 | LS on UE feature list for NR | DOCOMO Communications Lab. | imported from 3GU |
R4‑1907594 | draft CR of modification on reference for inter-band EN-DC including FR2 for TS 38.101-3 | NTT DOCOMO INC. | imported from 3GU |
R4‑1907595 | WF on band plan for NR-U 5GHz | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907596 | WF for NR-U Band plan work for 6GHz | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907597 | LS to ETSI TC BRAN on Interpretations of EN 301 893 for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907598 | draft LS on UL wideband operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907599 | TP to TR 38.828 - clean up | Huawei | imported from 3GU |
R4‑1907600 | TP to TR 38.828: Addition of missing antenna configurations to simulation assumptions | Ericsson | imported from 3GU |
R4‑1907601 | Co-existence simulation results of CLI for FR1 | LG Electronics Finland | imported from 3GU |
R4‑1907602 | Co-existence simulation results of CLI for FR2 | LG Electronics Finland | imported from 3GU |
R4‑1907603 | TP on simulation results and AnnexA_Detailed simulation results for non zero grid shift | LG Electronics Finland | imported from 3GU |
R4‑1907604 | TP to TR 38.828 ACI simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907605 | TP on summary and recommendation of co-existence evaluation of CLI | LG Electronics Finland | imported from 3GU |
R4‑1907606 | WF on summary and recommendations for ^^co-existence evaluation of CLI | LG Electronics Finland, Huawei, Ericsson, Nokia, Qualcomm | imported from 3GU |
R4‑1907607 | TP on Editorial Corrections to TR38.886 | Huawei, HiSilicon | imported from 3GU |
R4‑1907608 | Draft CR for TR38.810: Interpolation at or near the Pole for TRP | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1907609 | TP to TR38.827 v1.0.0 on test methods channel model | CAICT | imported from 3GU |
R4‑1907610 | Draft CR to TR38.810 on beam correspondence | Samsung, Apple | imported from 3GU |
R4‑1907611 | Draft CR to TS38.101-2 on beam correspondence | Samsung, Apple, Verizon | imported from 3GU |
R4‑1907612 | Remaining issues with the beam correspondence requirement | Apple Inc. | imported from 3GU |
R4‑1907613 | CR to 38.817-01 to capture outcome of beam correspondence | Apple Inc. | imported from 3GU |
R4‑1907614 | Simulation of beam correspondence tolerance | OnePlus | imported from 3GU |
R4‑1907615 | WF on switching and interruption time for MIMO layer adaption for power saving | CATT, Huawei, Huawei Device, vivo | imported from 3GU |
R4‑1907616 | IAB definitions | Huawei | imported from 3GU |
R4‑1907617 | WF on Rel-16 IAB scope | Ericsson | imported from 3GU |
R4‑1907618 | CR to 37.141: Simplification of capability sets definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907619 | Introduction of bands 87 and 88 into TS 36.101 | Nokia | imported from 3GU |
R4‑1907620 | TP for background and channel raster for TR 36.abc | Ericsson | imported from 3GU |
R4‑1907621 | TP to the new TR related to MTC: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1907622 | AH mintues on NR BS conformance testing | Huawei | imported from 3GU |
R4‑1907623 | Draft CR to TS 38.141-02: Test model (section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1907624 | Draft CR for TS38.141-1: adding demodulation reference signals for PDSCH for TAE requirement | CATT | imported from 3GU |
R4‑1907625 | Draft CR for TS37.105: correction on TX Diversity and CRS for NR for TAE requirement | CATT | imported from 3GU |
R4‑1907626 | CR to TR 37.145-2 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1907627 | CR to TR 37.843 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1907628 | CR to TR 38.817-02 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1907629 | Draft CR to 38.104: Term “reference signal” replacing by term “ideal signal” in EVM context | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907630 | Draft CR to 38.141-1: Term “reference signal” replacing by term “ideal signal” in EVM context | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907631 | Draft CR to 38.141-2: Term “reference signal” replacing by term “ideal signal” in EVM context | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907632 | Draft CR to 38.141-1: corrections to the Annex F structure | Huawei | imported from 3GU |
R4‑1907633 | Draft CR to 38.141-2: corrections to the Annex F structure | Huawei | imported from 3GU |
R4‑1907634 | Draft CR to 38.104: corrections to the EVM annex | Keysight | imported from 3GU |
R4‑1907635 | CR to 38.817-02: Background on the EVM | ZTE | imported from 3GU |
R4‑1907636 | Draft CR to TS38.141-1 on target resource block clarification for EVM measurement (4.9.2.2, 4.9.2.3, 6.5.3.5) | Keysight Technologies, Ericsson, Huawei, ZTE, Nokia | imported from 3GU |
R4‑1907637 | Draft CR to TS38.141-2 on target resource block clarification for EVM measurement (4.9.2.2, 4.9.2.3, 6.6.3.5) | Keysight Technologies, Ericsson, Huawei, ZTE, Nokia | imported from 3GU |
R4‑1907638 | Draft CR to TS38.141-1: Correction on test model TM1.2, 3.2, 3.3 (4.9.2.2, 4.9.2.3) | Keysight Technologies, Ericsson, Huawei, ZTE, Nokia | imported from 3GU |
R4‑1907639 | Draft CR to TS38.141-2: Correction on test model | Keysight Technologies, Ericsson, Huawei, ZTE, Nokia | imported from 3GU |
R4‑1907640 | Draft CR to TS 38.141-2: Editorial cleanup of OTA transmit ON/OFF power in subclause 6.5 | Ericsson | imported from 3GU |
R4‑1907641 | CR to TR38.817-02 on TT and MU tables for FR2 OFF power | Huawei | imported from 3GU |
R4‑1907642 | Draft CR to TS38.141-2 on TT and MU tables for FR2 Tx OFF power measurement (4.1.2.2, C.1) | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1907643 | CR to TR 38.817-02: updating the FR2 OTA transmit ON/OFF column in Table 12.10.1-1 (12.10.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907644 | CR to TR38.817-02 Correction on beam based direcrtions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907645 | CR to TR37.843 Correction on beam based direcrtions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907646 | WF on defining synchronized operation in BS specifications | Samsung | imported from 3GU |
R4‑1907647 | Addition of power backoff for 256QAM and 1024QAM | Ericsson | imported from 3GU |
R4‑1907648 | Addition of power backoff for 256QAM and 1024QAM | Ericsson | imported from 3GU |
R4‑1907649 | Blocking requirement for MSR/NR operation | Ericsson | imported from 3GU |
R4‑1907650 | Blocking requirement for MSR/NR operation | Ericsson | imported from 3GU |
R4‑1907651 | Correction to out of band blocking requirement | Ericsson | imported from 3GU |
R4‑1907652 | Correction to out of band blocking requirement | Ericsson | imported from 3GU |
R4‑1907653 | TS 37.145-2 Correction on usage of terms TRP and EIRP | Ericsson | imported from 3GU |
R4‑1907654 | CR to TP 37.843: Correction on usage of term EIRP | Ericsson | imported from 3GU |
R4‑1907655 | CR to TR 37.843: editorial corrections to spherical angle formula in subclause 10.8.2.4 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1907656 | Draft Response LS on UL sharing applicability in different scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907657 | WF on SAR solution for SUL with NR PC2 band | CMCC | imported from 3GU |
R4‑1907658 | Draft CR on SUL band combinations to TS 38.101-3 | ZTE Wistron Telecom | imported from 3GU |
R4‑1907659 | Draft CR to TS 38.104 on Spurious emission Category B in FR2 | Ericsson, Samsung, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907660 | Draft CR to TS 38.141-2 on Spurious emission Category B in FR2 | Ericsson, Samsung, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907661 | Draft CR to 38.104 Definition of contiguous transmission bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907662 | Draft CR to 38.104: BS TAE requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1907663 | Draft CR to 38.141-2: BS TAE requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1907664 | Draft CR to 38.104: Clarification of interferer RB frequency for narrowband blocking | Ericsson, Nokia | imported from 3GU |
R4‑1907665 | Draft CR to 38.141-1: Clarification of interferer RB frequency for narrowband blocking | Ericsson, Nokia | imported from 3GU |
R4‑1907666 | Draft CR to 38.141-2: Clarification of interferer RB frequency for narrowband blocking | Ericsson, Nokia | imported from 3GU |
R4‑1907667 | AH meeting minutes for NR-U | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1907668 | CR to TP 37.843: Correction on usage of term EIRP | Ericsson | imported from 3GU |
R4‑1907669 | CR to TR 38.817-02 Editorial Corrections | CMCC | imported from 3GU |
R4‑1907670 | Draft CR to TS 38.141-2: Corrections to Annex I (TRP) | Ericsson | imported from 3GU |
R4‑1907671 | Draft CR to TS 38.141-2: Correction on usage of terms TRP and EIRP | Ericsson | imported from 3GU |
R4‑1907672 | Draft CR for TS 38.104: Correction on EVM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907673 | CR to TS 37.145-01: TAE requirement (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1907674 | DraftCR to TS 38.141-1: removal of Rel-16 CRs from Rel-15 specification | Huawei | imported from 3GU |
R4‑1907675 | Draft CR to TS 38.141-2 improvements to annex I | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R4‑1907676 | Draft CR to TS 38.141-2: Addition of RC test method in test procedures for output power, ACLR and OBUE in subclause 6.3.4.2, 6.7.3.4.2 and 6.7.4.4.2 | Ericsson | imported from 3GU |
R4‑1907677 | Draft CR to 38.141-2: Correction on OTA measurement setup (Annex E) | NEC | imported from 3GU |
R4‑1907678 | Draft CR to TS 38.141-2: Added description of symbol TRP Estimate | Ericsson | imported from 3GU |
R4‑1907679 | Draft CR to TS 38.141-2: Clarifying sensitivity procedure | Ericsson | imported from 3GU |
R4‑1907680 | Draft CR for TS 38.141-2: Correction on test procedure for EIRP power measurement | CATT | imported from 3GU |
R4‑1907681 | CR to TR 38.817-02: Addition of MU evaluation for testing output power, ACLR and OBUE in RC test method in subclause 12.6 | Ericsson | imported from 3GU |
R4‑1907682 | Draft CR to 38.141-2: Correction on procedure for general OTA transmitter spurious emissions requirements (6.7.5) | NEC | imported from 3GU |
R4‑1907683 | Draft CR to 38.141-2: Correction on OTA transmitter spurious emissions co-location requirements (6.7.5) | NEC | imported from 3GU |
R4‑1907684 | Draft CR to 38.141-2 Definition of contiguous transmission bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907685 | Draft CR to TS 38.141-2: Clarification om beam identifier declaration in subclause 4.6 | Ericsson | imported from 3GU |
R4‑1907686 | WF on nominal channel spacing | ZTE, Ericsson, Nokia | imported from 3GU |
R4‑1907687 | Correction to CA carrier spacing | Ericsson | imported from 3GU |
R4‑1907688 | Correction to CA carrier spacing | Ericsson | imported from 3GU |
R4‑1907689 | Correction to CA carrier spacing | Ericsson | imported from 3GU |
R4‑1907690 | CR to TS37.104: Nominal channel spacing for NR for CA | ZTE Corporation | imported from 3GU |
R4‑1907691 | CR to TS37.141: Nominal channel spacing for NR for CA | ZTE Corporation | imported from 3GU |
R4‑1907692 | Correction on fOOB for 37.145-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1907693 | CR to TS 37.145-2: Clarification om beam identifier declaration in subclause 4.10 | Ericsson | imported from 3GU |
R4‑1907694 | CR to TS 37.145-2: Correction to reference to Annex | Ericsson | imported from 3GU |
R4‑1907695 | CR to TS 37.145-2: Clarifying sensitivity procedure | Ericsson | imported from 3GU |
R4‑1907696 | CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2 | Ericsson | imported from 3GU |
R4‑1907697 | CR to TS 37.145-2. Clarification of TRP methods applicability in Annex F | Ericsson | imported from 3GU |
R4‑1907698 | CR to TS 37.145-2: Correction to procedure for SEM and OBUE | Ericsson | imported from 3GU |
R4‑1907699 | CR to TS 37.145-2: Improved description of symbol TRP Estimate | Ericsson | imported from 3GU |
R4‑1907700 | CR to TS 37.145-2: Correction to Total Radiated Power definition and Single-band RIB | Ericsson | imported from 3GU |
R4‑1907701 | CR to TS 37.145-1: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1907702 | CR to TS 37.145-2: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1907703 | Draft CR to TS 38.113 (subclause 3.2,3.3,4.4.2) | ZTE Corporation | imported from 3GU |
R4‑1907704 | CR to TS 37.113 subclause 4.5 | ZTE Trunking Technology Corp. | imported from 3GU |
R4‑1907705 | Draft CR to TS 38.113 (subclause 8.2.1) | ZTE Corporation | imported from 3GU |
R4‑1907706 | CR to TS 37.114 subclause 4 | ZTE Corporation | imported from 3GU |
R4‑1907707 | CR to 37.114 Subsections index in Section 4.1 | Ericsson | imported from 3GU |
R4‑1907708 | Draft CR to TS38.113 Editorial correction to subclause 3.1 3.2 3.3 6.1 6.2 and 9.1 | CAICT | imported from 3GU |
R4‑1907709 | CR to TS 38.113 | ZTE | imported from 3GU |
R4‑1907710 | TR skeleton for TR 38.8xx: Study on support of NR downlink 256 Quadrature Amplitude Modulation (QAM) for frequency range 2 (FR2) | China Telecom | imported from 3GU |
R4‑1907711 | Simulation assumption of feasibility study for FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1907712 | Channel model parameters for UMi and UMa CDL-A and C for FR1 | Keysight Technologies, Spirent Communications | imported from 3GU |
R4‑1907713 | Channel model parameters for UMi and InO CDL-A and C for FR2 | Keysight Technologies, Spirent Communications | imported from 3GU |
R4‑1907714 | WF on LTE/NR spectrum sharing in Band41/n41 | CMCC | imported from 3GU |
R4‑1907715 | Introduction of a new NR band for LTE/NR sharing in Band 41/n41 | Ericsson, Samsung | imported from 3GU |
R4‑1907716 | Introduction of band combinations and requirements for Band n87 (LTE/NR sharing) | Ericsson, Samsung | imported from 3GU |
R4‑1907717 | n65 introduction to 38.101-1 | Dish Network, HNS | imported from 3GU |
R4‑1907718 | n65 introduction to 38.104 | Dish Network, HNS | imported from 3GU |
R4‑1907719 | n65 introduction to 37.104 | Dish Network, HNS | imported from 3GU |
R4‑1907720 | n65 introduction to 38.133 | Dish Network, HNS | imported from 3GU |
R4‑1907721 | n65 introduction to 36.104 | Dish Network, HNS | imported from 3GU |
R4‑1907722 | n65 introduction to 36.141 | Dish Network, HNS | imported from 3GU |
R4‑1907723 | n65 introduction to 37.105 | Dish Network, HNS | imported from 3GU |
R4‑1907724 | n65 introduction to 37.141 | Dish Network, HNS | imported from 3GU |
R4‑1907725 | n65 introduction to 37.145-1 | Dish Network, HNS | imported from 3GU |
R4‑1907726 | n65 introduction to 37.145-2 | Dish Network, HNS | imported from 3GU |
R4‑1907727 | n65 introduction to 38.141-1 | Dish Network, HNS | imported from 3GU |
R4‑1907728 | n65 introduction to 38.141-2 | Dish Network, HNS | imported from 3GU |
R4‑1907729 | Way forward on NR V2X transmit timing error | LGE | imported from 3GU |
R4‑1907730 | LS on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1907731 | Way forward on NR V2X transmit timing error | LGE | imported from 3GU |
R4‑1907732 | Way forward on IAB OTA timing and RRM | Ericsson, Samsung, Nokia, Nokia Shanghai Bell, Huawei, HiSilicon | imported from 3GU |
R4‑1907733 | Way forward on Rel-16 MTC RRM enhancement | Ericsson, Nokia, Nokia Shanghai Bell , Qualcomm Incorporated, Huawei, HiSilicon, Sierra Wireless, S.A. | imported from 3GU |
R4‑1907734 | Way forward on R16 enhancement for NB-IoT RRM | Huawei, HiSilicon, Nokia, Ericsson, Qualcomm | imported from 3GU |
R4‑1907735 | Reply to LS on non-anchor carrier idle mode measurements for RRM | Qualcomm Incorporated | imported from 3GU |
R4‑1907736 | Way forward on Noc level and range of antenna gain | Ericsson | imported from 3GU |
R4‑1907737 | Way forward on LTE mobility enhancement | China Telecom | imported from 3GU |
R4‑1907738 | LS on the capability and signalling for LTE high speed in R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1907739 | Way forward on HST RRM | NTT DOCOMO | imported from 3GU |
R4‑1907740 | Simulation results for normal PDSCH demodulation test of 2nd priority TDD configurations | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907741 | Simulation results for SDR test in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907742 | Split of the NR editorial work | Ericsson | imported from 3GU |
R4‑1907743 | Correction to demodulation of PDSCH 4Rx CA | ANRITSU LTD | imported from 3GU |
R4‑1907744 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1907745 | WF on UE demod in Rel16 LTE HST | Qualcomm Incorporated | imported from 3GU |
R4‑1907746 | Way forward on LTE HST UE demodulation simulation assumptions | Intel | imported from 3GU |
R4‑1907747 | Way forward on LTE HST BS demodulation performance requirements | Nokia, Nokia Shanghai Bell, NTT DOCOMO, INC., Ericsson | imported from 3GU |
R4‑1907748 | Draft CR to TR 38.810 on NR FR2 UE Demodulation test methods | Intel Corporation | imported from 3GU |
R4‑1907749 | CR 36.104 Corrections to demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907750 | Addition of L1-RSRP delay test in FR1 (section A.4.6, A.6.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1907751 | Addition of L1-RSRP delay test in FR2 (section A.5.6, A.7.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1907752 | Draft CR on NR-NR handover test cases | Intel | imported from 3GU |
R4‑1907753 | Draft CR on test cases of RRC release with re-direction to NR/E-UTRAN | Intel | imported from 3GU |
R4‑1907754 | Draft CR on test cases for SSB RSRQ measuremet accuracy | Samsung | imported from 3GU |
R4‑1907755 | CR on TS38.133 for CSSF outside gap when SFTD measurement is configured (Section 9.1.5) | MediaTek inc. | imported from 3GU |
R4‑1907756 | Correction CR for inter-RAT NR measurement before EN-DC in 36.133 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907757 | CR on measurement outside gap in FR2 with partially-overlapped SMTC (9.1.5) | MediaTek inc. | imported from 3GU |
R4‑1907758 | CR on scheduling restriction on L1-RSRP measurement (section 9.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1907759 | CR on reselection criterion in idle mode (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907760 | CR section 6.1.1.4, 6.1.1.5 Handover to known FR2 cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907761 | Darft CR for Measurement Gap Sharing in NE-DC (Section 9.1.2, 9.1.5) | Samsung | imported from 3GU |
R4‑1907762 | Darft CR for Measurement Gap Sharing in NR-DC (Section 9.1.2, 9.1.5) | Samsung | imported from 3GU |
R4‑1907763 | [draft] LS on UE demodulation performance enhancement indicator for HST-SFN scenario | NTT DOCOMO, INC | imported from 3GU |
R4‑1907764 | LS on UE demodulation performance enhancement indicator for HST-SFN scenario | NTT DOCOMO, INC | imported from 3GU |
R4‑1907765 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1907766 | PSCell addition delay in FR2 36.133 rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907767 | PSCell addition delay in FR2 38.133 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907768 | draftCR on event triggering and reporting criteria (section 9.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1907769 | CR on introduction of SFTD measurement requriements for NR SA (section 9.3.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1907770 | DraftCR on correcting the conditions in section B.2.4 B.2.5 and B.2.6 | Huawei, HiSilicon | imported from 3GU |
R4‑1907771 | Update to test cases for SCell activation/deactivation in SA (section A.6.5.3 and A.7.5.3) | CATT | imported from 3GU |
R4‑1907772 | TC EN-DC SCell activation delay in FR1 (A.4.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907773 | CR on scheduling restriction on L1-RSRP measurement (section 9.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1907774 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1907775 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1907776 | CR for eMTC RSTD test cases | Huawei, HiSilicon | imported from 3GU |
R4‑1907777 | Addition of power backoff for 256QAM and 1024QAM | Ericsson | imported from 3GU |
R4‑1907778 | void | void | imported from 3GU |
R4‑1907779 | LS on 10 MHz Channel BW for NR-U | Vodafone | imported from 3GU |
R4‑1907780 | Introduction of band n48 into TS 38.101-1 | Nokia, Ericsson, Qualcomm, Skyworks Solutions Inc | imported from 3GU |
R4‑1907781 | CR to introduce n18 to TS 38.101-1 | KDDI | imported from 3GU |
R4‑1907782 | WF on Band n7 REFSENS and A-MPR | Nokia, Qualcomm, Huawei | imported from 3GU |
R4‑1907783 | CR to TS 38.101-1: Introduction of band n14 - Endorsed R4-1904008 in RAN4#90b | Ericsson, AT&T | imported from 3GU |
R4‑1907784 | CR to TS 38.101-1: Introduction of band n30 + editorial in table 7.6.2-2 | Ericsson | imported from 3GU |
R4‑1907785 | CR to TS 36.104: Introduction of band n30 | Ericsson | imported from 3GU |
R4‑1907786 | TP for TR 38.887: Regulatory situation in 37-43.5 GHz frequency range | Ericsson GmbH, Eurolab, Huawei, HiSilicon | imported from 3GU |
R4‑1907787 | Protection of SUL band n89 to TS 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1907788 | Protection of SUL band n89 to TS 36.141 | Huawei, HiSilicon | imported from 3GU |
R4‑1907789 | Protection of SUL band n89 to TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1907790 | Protection of SUL bands to TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1907791 | Ad-hoc meeting minutes for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1907792 | TP to TR 38.820: BS EMC emission requirements for 7-24 GHz | Huawei | imported from 3GU |
R4‑1907793 | WF on BS requirmenet sets for 7-24 GHz range | Ericsson | imported from 3GU |
R4‑1907794 | WF on BS PA and filter aspects for 7-24GHz | Huawei, Ericsson | imported from 3GU |
R4‑1907795 | TP to TR 38.820: Addition of BS requirement sets in subclause 8.2 | Ericsson | imported from 3GU |
R4‑1907796 | TP to TR 38.820: Addition of PA trends in subclause 6.3.1 | Ericsson | imported from 3GU |
R4‑1907797 | TR 38.820: updated TR skeleton for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1907798 | TP to TR 38.820: Addition of example frequencies in subclause 6.2 | Ericsson | imported from 3GU |
R4‑1907799 | TP to TR38.820 on Scope | Huawei, HiSilicon | imported from 3GU |
R4‑1907800 | WF on the deployment scenarios for 7-24GHz | Huawei | imported from 3GU |
R4‑1907801 | LS to RAN4 on impact of sync raster placement for NR-U in RAN1 | RAN1, Qualcomm | imported from 3GU |
R4‑1907802 | TP to TR 38.820: Inclusion of NF Background Information for BS requirements | Ericsson | imported from 3GU |
R4‑1907803 | WF on FR1/FR2 differences | Huawei, Ericson | imported from 3GU |
R4‑1907804 | LS on LTE/NR spectrum sharing in band 41/n41 | CMCC | imported from 3GU |
R4‑1907805 | CR to TS38.104 to introducing spectrum sharing on band n41 | Samsung, Ericsson, KDDI | imported from 3GU |
R4‑1907806 | Draft CR to 37.104: Introduction of requirements for NR + UTRA/GSM combinations | Ericsson, Huawei, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1907807 | WF on capability sets | Ericsson, Huawei, Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1907808 | Draft CR to 38.101-3 NE-DC introducation | InterDigital Communications | imported from 3GU |
R4‑1907809 | WF on co-existence NB-IoT with NR | Huawei, HiSilicon, Ericsson, ZTE, DISH, T-Mobile USA, CHTTL, Nokia | imported from 3GU |
R4‑1907810 | TP for NB-IoT standalone operating | Huawei, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907811 | NB-IoT - NR coexistence : TP to TR - channel raster | Ericsson, ZTE | imported from 3GU |
R4‑1907812 | TP to the new TR related to NB-IoT: mixed numerologies | ZTE Corporation | imported from 3GU |
R4‑1907813 | LS on LTE/NR spectrum sharing in band 41/n41 | CMCC | imported from 3GU |
R4‑1907814 | CR to 37.105: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907815 | CR to 37.145-1: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907816 | CR to 37.145-2: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1907817 | CR to 37.105: Introduction of n48 | Nokia | imported from 3GU |
R4‑1907818 | CR to 37.145-1: Introduction of n48 | Nokia | imported from 3GU |
R4‑1907819 | CR to 37.145-2: Introduction of n48 | Nokia | imported from 3GU |
R4‑1907820 | LS to ETSI TC BRAN on Interpretations of EN 301 893 for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907821 | WF on Coexistence Scenarios ^^and Simulation Parameters | LG Electronics France | imported from 3GU |
R4‑1907822 | Meeting minutes on AH sessions for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1907823 | WF on framework for V2X operation in licensed band operation | LG Electronics France | imported from 3GU |
R4‑1907824 | AH meeting mintues for IAB ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1907825 | WF on simulation assumptions for IAB co-existence study | Qualcomm Incorporated | imported from 3GU |
R4‑1907826 | WF on Coexistence Scenarios ^^and Simulation Parameters | LG Electronics France | imported from 3GU |
R4‑1907827 | Draft Response LS on UL sharing applicability in different scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907828 | Draft CR for TR38.810: On 30cm QZ | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑1907829 | Channel model parameters for UMi and UMa CDL-A and C for FR1 | Keysight Technologies, Spirent Communications | imported from 3GU |
R4‑1907830 | Channel model parameters for UMi and InO CDL-A and C for FR2 | Keysight Technologies, Spirent Communications | imported from 3GU |
R4‑1907831 | Introduce Band n18 to 37.141 | KDDI | imported from 3GU |
R4‑1907832 | Introduce Band n18 to 37.104 | KDDI | imported from 3GU |
R4‑1907833 | Introduce Band n18 to 37.145-1 | KDDI | imported from 3GU |
R4‑1907834 | Introduce Band n18 to 37.145-2 | KDDI | imported from 3GU |
R4‑1907835 | Introduce Band n18 to 37.105 | KDDI | imported from 3GU |
R4‑1907836 | Introduction of Band n14 in TS 37.105 | Ericsson | imported from 3GU |
R4‑1907837 | Introduction of Band n14 in TS 37.145-1 | Ericsson | imported from 3GU |
R4‑1907838 | Introduction of Band n14 in TS 37.145-2 | Ericsson | imported from 3GU |
R4‑1907839 | Introduction of Band n30 in TS 37.105 | Ericsson | imported from 3GU |
R4‑1907840 | Introduction of Band n30 in TS 37.145-1 | Ericsson | imported from 3GU |
R4‑1907841 | Introduction of Band n30 in TS 37.145-2 | Ericsson | imported from 3GU |
R4‑1907842 | CR to TS 37.145-01: TAE requirement (section 6.5.3) | ZTE Corporation | imported from 3GU |
R4‑1907843 | CR to TR38.817-02 Correction on beam based direcrtions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907844 | CR to TR37.843 Correction on beam based direcrtions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1907845 | CR for TS37.105: correction on TX Diversity and CRS for NR for TAE requirement | CATT | imported from 3GU |
R4‑1907846 | CR to TR 37.843 removal of Tx Diversity for TAE testing | Huawei, HiSilicon | imported from 3GU |
R4‑1907847 | Draft CR to TS 38.141-02: Test model (section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1907848 | LS to ETSI TC BRAN on Interpretations of EN 301 893 for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907849 | WF for R16 LTE-MTC coexistence with NR | Nokia, Ericsson, Huawei, ZTE | imported from 3GU |
R4‑1907850 | LS to ETSI TC BRAN on Interpretations of EN 301 893 for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1907851 | Draft CR to TS 38.141-2: Editorial cleanup of OTA transmit ON/OFF power in subclause 6.5 | Ericsson | imported from 3GU |
R4‑1907852 | CR to TR 38.817-02: Addition of MU evaluation for testing output power, ACLR and OBUE in RC test method in subclause 12.6 | Ericsson | imported from 3GU |
R4‑1907853 | Draft CR to TS 38.141-2: Clarification om beam identifier declaration in subclause 4.6 | Ericsson | imported from 3GU |
R4‑1907854 | CR to TS 37.145-2: Clarification om beam identifier declaration in subclause 4.10 | Ericsson | imported from 3GU |
R4‑1907855 | CR to TS 37.145-2. Clarification of TRP methods applicability in Annex F | Ericsson | imported from 3GU |
R4‑1907856 | TR 38.820: updated TR skeleton for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1907857 | Introduction of Band n14 in TS 37.145-1 | Ericsson | imported from 3GU |
R4‑1907858 | CR for TS37.105: correction on TX Diversity and CRS for NR for TAE requirement | CATT | imported from 3GU |
R4‑1907859 | Void | ETSI | imported from 3GU |
R4‑1907860 | CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1907861 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1907862 | CR to TS 38.133: Implementation of endorsed draft CRs from RAN4#90bis and RAN4#91 | Intel Corporation | imported from 3GU |
R4‑1907863 | Big CR for agreed DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
page generated from database: 2024-07-20 12:15:34