3GPP TDocs (written contributions) at meeting
Meeting: R1-92b - 2018-04-16 to 2018-04-20, Sanya
meeting id: R1-92b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑180357 | - | - | - |
R1‑1803570 | Draft Agenda of RAN1#92bis meeting | RAN1 Chair | imported from 3GU |
R1‑1803571 | Report of RAN1#92 meeting | ETSI | imported from 3GU |
R1‑1803572 | Highlights from RAN#79 | RAN1 Chair | imported from 3GU |
R1‑1803573 | Reply LS to RAN1 on wake-up signal | RAN2, Huawei | imported from 3GU |
R1‑1803574 | LS on LTE peak data-rate calculation for EN-DC | RAN2, Intel | imported from 3GU |
R1‑1803575 | LS on messagePowerOffsetGroupB | RAN2, Ericsson | imported from 3GU |
R1‑1803576 | LS response to RAN1 on NR MIMO MAC CE | RAN2, Huawei | imported from 3GU |
R1‑1803577 | LS to RAN1 on Beam- and Cell- Radio-Link-Monitoring | RAN2, Nokia | imported from 3GU |
R1‑1803578 | Reply to LS on eV2X evaluation methodology | 5GAA WG4, Intel | imported from 3GU |
R1‑1803579 | LS to RAN1 on handling parallel RA procedure and SR procedure | RAN2, AsusTek | imported from 3GU |
R1‑180358 | - | - | - |
R1‑1803580 | Reply LS on HARQ-ACK feedback for efeMTC | RAN2, Qualcomm | imported from 3GU |
R1‑1803581 | LS on maximum number of CCs for NR CA | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1803582 | LS on Message 3 size for NR | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1803583 | Reply LS on required information for NSA on X2 | RAN2, Nokia Shanghai Bell | imported from 3GU |
R1‑1803584 | LS on Frequency Band list | RAN2, Huawei | imported from 3GU |
R1‑1803585 | LS on RAN2 agreements for LTE URLLC | RAN2, Ericsson | imported from 3GU |
R1‑1803586 | Response LS on Maximum TBS for PDSCH containing RMSI/OSI/Paging | RAN2, Huawei | imported from 3GU |
R1‑1803587 | LS on UL timing difference in EN-DC | RAN2, Qualcomm | imported from 3GU |
R1‑1803588 | Reply LS on SI reception in BWP | RAN2, LG Electronics | imported from 3GU |
R1‑1803589 | LS on RAN2 agreements for euCA | RAN2, Nokia | imported from 3GU |
R1‑180359 | - | - | - |
R1‑1803590 | LS on UE measurements for demodulation test setup in FR2 | RAN4, Intel | imported from 3GU |
R1‑1803591 | Reply LS on clarification in MAC | RAN4, Huawei | imported from 3GU |
R1‑1803592 | LS reply on UE RF related parameters, capabilities and features for NR standalone | RAN4, NTT DOCOMO | imported from 3GU |
R1‑1803593 | LS reply on UE baseband processing capability | RAN4, Intel | imported from 3GU |
R1‑1803594 | Reply LS on NR Idle Mode Measurements | RAN4, CMCC | imported from 3GU |
R1‑1803595 | LS reply to RAN1 on P_0 ranges on UL power control | RAN4, Huawei | imported from 3GU |
R1‑1803596 | LS on NR UE feature list | RAN, NTT DOCOMO | imported from 3GU |
R1‑1803597 | LS on Summary of email discussion “[ITU-R AH 01] Calibration for self-evaluation” | ITU-R Ad-Hoc, Huawei | imported from 3GU |
R1‑1803598 | LS on NSSS based NRSRP measurement definition | RAN4, Nokia | imported from 3GU |
R1‑1803599 | LS on EARFCN provisioning for Release 15 MTC and Release 15 NB-IOT UE | RAN4, Qualcomm | imported from 3GU |
R1‑180360 | - | - | - |
R1‑1803600 | LS on SFTD measurement before EN-DC | RAN4, Huawei | imported from 3GU |
R1‑1803601 | LS on PA EVM for pi/2 BPSK and DMRS | RAN4, Qualcomm | imported from 3GU |
R1‑1803602 | LS on BWP switching delay | RAN4, Intel | imported from 3GU |
R1‑1803603 | Reply LS on NR SS Raster Shift for Frequency Range 0-2700MHz | RAN4, ZTE | imported from 3GU |
R1‑1803604 | LS on UE feature list | RAN4, NTT DOCOMO, Intel | imported from 3GU |
R1‑1803605 | Acquisition of N_(TA_Offset) for Uplink Transmission | RAN4, Ericsson | imported from 3GU |
R1‑1803606 | Remaining details of Synchronization Signal Design | ZTE, Sanechips | imported from 3GU |
R1‑1803607 | Remaining details of NR-PBCH Design | ZTE, Sanechips | imported from 3GU |
R1‑1803608 | Remaining details of RMSI | ZTE, Sanechips | imported from 3GU |
R1‑1803609 | Remaining details of PRACH Resource Configuration | ZTE, Sanechips | imported from 3GU |
R1‑180361 | - | - | - |
R1‑1803610 | Remaining details of RACH procedure | ZTE, Sanechips | imported from 3GU |
R1‑1803611 | Remaining details of RRM measurements | ZTE, Sanechips | imported from 3GU |
R1‑1803612 | Remaining details of RLM | ZTE, Sanechips | imported from 3GU |
R1‑1803613 | Text proposal for LLS parameters in TR 38.812 (NOMA) | ZTE, Sanechips | imported from 3GU |
R1‑1803614 | Updated work plan for Rel-15 SI on NR NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1803615 | Key processing modules at transmitter side for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1803616 | Typical multi-user receivers for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1803617 | Procedures related to NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1803618 | System-level evaluation methodology and assumptions for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1803619 | Channel estimation error modeling for NOMA receiver | ZTE, Sanechips | imported from 3GU |
R1‑180362 | - | - | - |
R1‑1803620 | Summary of offline email discussion on Tx side processing and receiver types for clarification | ZTE, Sanechips | imported from 3GU |
R1‑1803621 | Summary of offline email discussion on system-level evaluation methodology and assumptions for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1803622 | Remaining issues on beam failure recovery | NEC | imported from 3GU |
R1‑1803623 | Remaining issues on PTRS configurations | NEC | imported from 3GU |
R1‑1803624 | Discusses on waveform and bandwidth of NR-U | NEC | imported from 3GU |
R1‑1803625 | Remaining details on synchronization signal | Huawei, HiSilicon | imported from 3GU |
R1‑1803626 | Remaining details of NR PBCH design | Huawei, HiSilicon | imported from 3GU |
R1‑1803627 | Remaining on RMSI configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1803628 | Remaining details of RACH Preambles | Huawei, HiSilicon | imported from 3GU |
R1‑1803629 | Remaining details of RACH Procedures | Huawei, HiSilicon | imported from 3GU |
R1‑180363 | - | - | - |
R1‑1803630 | Remaining details on NR RRM | Huawei, HiSilicon | imported from 3GU |
R1‑1803631 | Remaining details on NR RLM | Huawei, HiSilicon | imported from 3GU |
R1‑1803632 | Remaining issues on CW mapping | Huawei, HiSilicon | imported from 3GU |
R1‑1803633 | Summary of remaining issues for UL non-codebook based transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1803634 | Summary of remaining issues on CSI measurement | Huawei, HiSilicon | imported from 3GU |
R1‑1803635 | Summary of remaining issues on CSI reporting | Huawei, HiSilicon | imported from 3GU |
R1‑1803636 | Remaining issue for beam management | Huawei, HiSilicon | imported from 3GU |
R1‑1803637 | Summary of remaining issues on beam failure recovery | Huawei, HiSilicon | imported from 3GU |
R1‑1803638 | Remaining details on CSI-RS design in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1803639 | Remaining details of SRS design | Huawei, HiSilicon | imported from 3GU |
R1‑180364 | - | - | - |
R1‑1803640 | Remaining issues and TP for QCL assumptions | Huawei, HiSilicon | imported from 3GU |
R1‑1803641 | Remaining details of UL power control design | Huawei, HiSilicon | imported from 3GU |
R1‑1803642 | Remaining issues on search space | Huawei, HiSilicon | imported from 3GU |
R1‑1803643 | Remaining issues on group-common PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1803644 | Remaining issues on PUCCH structure in short-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803645 | Remaining issues on PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803646 | Remaining issues on UCI multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1803647 | Remaining issues on resource allocation for PUCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1803648 | Discussion on UE peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1803649 | Draft reply LS on NR UE peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑180365 | - | - | - |
R1‑1803650 | On RMSI PRB grid | Huawei, HiSilicon | imported from 3GU |
R1‑1803651 | On k0 for OFDM signal generation | Huawei, HiSilicon | imported from 3GU |
R1‑1803652 | Discussion and TP on slot format for ECP | Huawei, HiSilicon | imported from 3GU |
R1‑1803653 | Remaining issues on bandwidth part and wideband operation | Huawei, HiSilicon | imported from 3GU |
R1‑1803654 | Remaining issues on reserved resources and rate-matching | Huawei, HiSilicon | imported from 3GU |
R1‑1803655 | Remaining issues on NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1803656 | Discussion on remaining issues for SUL and EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑1803657 | Compact DCI for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1803658 | PDCCH repetition for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1803659 | UL multiplexing between URLLC and eMBB | Huawei, HiSilicon | imported from 3GU |
R1‑180366 | - | - | - |
R1‑1803660 | PDSCH reliability for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1803661 | MCS/CQI design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1803662 | Summary of remaining issues on pre-emption indication with TP | Huawei, HiSilicon | imported from 3GU |
R1‑1803663 | Discussion on the design of SCMA | Huawei, HiSilicon | imported from 3GU |
R1‑1803664 | Discussion on the design of NoMA receiver | Huawei, HiSilicon | imported from 3GU |
R1‑1803665 | Preliminary LLS evaluation results for mMTC scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1803666 | Preliminary LLS evaluation results for URLLC scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1803667 | Preliminary LLS evaluation results for eMBB scenario | Huawei, HiSilicon | imported from 3GU |
R1‑1803668 | Discussion on LLS and SLS evaluation metrics and parameters | Huawei, HiSilicon | imported from 3GU |
R1‑1803669 | Discussion on NoMA related procedures | Huawei, HiSilicon | imported from 3GU |
R1‑180367 | - | - | - |
R1‑1803670 | Three state V2X sidelink channel model | Huawei, HiSilicon, Spirent, Panasonic, Cohere Technologies, ITRI, Intel, InterDigital, CATT, NEC, Keysight, Qualcomm, ZTE, Sanechips, LGE, Fraunhofer HHI | imported from 3GU |
R1‑1803671 | V2X sidelink channel model | Huawei, HiSilicon | imported from 3GU |
R1‑1803672 | On eV2X Evaluation Methodology | Huawei, HiSilicon | imported from 3GU |
R1‑1803673 | Consideration on GEO and LEO channel models | Huawei, HiSilicon | imported from 3GU |
R1‑1803674 | HAPS channel modeling | Huawei, HiSilicon | imported from 3GU |
R1‑1803675 | General considerations on NTN Channel Modeling | Huawei, HiSilicon | imported from 3GU |
R1‑1803676 | Design princples of physcial channels on NR unlicensed band | Huawei, HiSilicon | imported from 3GU |
R1‑1803677 | Numerology and wideband operation in NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1803678 | NR frame structure and scheduling on unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1803679 | Coexistence and channel access for NR unlicensed band operations | Huawei, HiSilicon | imported from 3GU |
R1‑180368 | - | - | - |
R1‑1803680 | SSB/DRS in NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1803681 | Random access in NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1803682 | UCI transmission in NR unlicensed | Huawei, HiSilicon | imported from 3GU |
R1‑1803683 | Consideration on evaluation features and parameters for IMT-2020 self evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑1803684 | Initial evaluation results of eMBB spectral efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1803685 | Consideration on self evaluation of IMT-2020 for user experienced data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1803686 | Consideration on self evaluation of IMT-2020 for area traffic capacity | Huawei, HiSilicon | imported from 3GU |
R1‑1803687 | Consideration on self evaluation of IMT-2020 for high mobility | Huawei, HiSilicon | imported from 3GU |
R1‑1803688 | Consideration on self evaluation of IMT-2020 for peak spectral efficiency and peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1803689 | Consideration on self evaluation of IMT-2020 for network energy efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑180369 | - | - | - |
R1‑1803690 | Consideration on self evaluation of IMT-2020 for mMTC connection density | Huawei, HiSilicon | imported from 3GU |
R1‑1803691 | Consideration on self evaluation of IMT-2020 for reliability | Huawei, HiSilicon | imported from 3GU |
R1‑1803692 | Consideration on self evaluation of IMT-2020 for control plane latency | Huawei, HiSilicon | imported from 3GU |
R1‑1803693 | Consideration on self evaluation of IMT-2020 for user plane latency | Huawei, HiSilicon | imported from 3GU |
R1‑1803694 | Consideration on IAB evaluation methodology and parameters | Huawei, HiSilicon | imported from 3GU |
R1‑1803695 | Physical layer enhancement consideration on IAB | Huawei, HiSilicon | imported from 3GU |
R1‑1803696 | Ray Tracing simulation result for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑1803697 | On the multipath propagation in satellite to UE link | Huawei, HiSilicon | imported from 3GU |
R1‑1803698 | Discussion on semi-static HARQ-ACK codebook for slot aggregation | Huawei, HiSilicon | imported from 3GU |
R1‑1803699 | Draft reply LS on LTE peak data rate calculation for EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑180370 | - | - | - |
R1‑1803700 | Remaining details of UL power control design for CA | Huawei, HiSilicon | imported from 3GU |
R1‑1803701 | QCL and spatial-relation for simultaneous reception and transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1803702 | LS reply on maximum number of CCs for NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1803703 | Remaining issues on TA aspects | Huawei, HiSilicon | imported from 3GU |
R1‑1803704 | Remaining issues on RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1803705 | Remaining issues on DMRS design | Huawei, HiSilicon | imported from 3GU |
R1‑1803706 | Remaining issues on PTRS | Huawei, HiSilicon | imported from 3GU |
R1‑1803707 | Remaining issues on DCI contents and format | Huawei, HiSilicon | imported from 3GU |
R1‑1803708 | DCI interpretation for different BWP | Huawei, HiSilicon | imported from 3GU |
R1‑1803709 | Remaining issues on resource allocation and TBS | Huawei, HiSilicon | imported from 3GU |
R1‑180371 | - | - | - |
R1‑1803710 | Summary of remaining issues on PDCCH monitoring with TP | Huawei, HiSilicon | imported from 3GU |
R1‑1803711 | Blind/HARQ-less Repetition for Scheduled DL-SCH Operation | Huawei, HiSilicon | imported from 3GU |
R1‑1803712 | Repetition Enhancements for UL SPS Operation | Huawei, HiSilicon | imported from 3GU |
R1‑1803713 | Views on LTE Control Plane Latency Reduction | Huawei, HiSilicon | imported from 3GU |
R1‑1803714 | Aspects related to DL control channel | Huawei, HiSilicon | imported from 3GU |
R1‑1803715 | Additional DMRS position pattern for subslot #5 | Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑1803716 | Aspects related to DL data channel | Huawei, HiSilicon | imported from 3GU |
R1‑1803717 | Aspects related to FS2 | Huawei, HiSilicon | imported from 3GU |
R1‑1803718 | Handling of collision between PRACH and sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1803719 | Remaining issues on SPS | Huawei, HiSilicon | imported from 3GU |
R1‑180372 | - | - | - |
R1‑1803720 | Aspects related to UL control channel | Huawei, HiSilicon | imported from 3GU |
R1‑1803721 | Corrections on feCoMP | Huawei, HiSilicon | imported from 3GU |
R1‑1803722 | Draft reply LS to RAN2 on beam- and cell- radio link monitoring | CATT | imported from 3GU |
R1‑1803723 | Remaining details on carrier aggregation for mode 4 in V2X phase 2 | CATT | imported from 3GU |
R1‑1803724 | Remaining details on synchronization for carrier aggregation in V2X Phase 2 | CATT | imported from 3GU |
R1‑1803725 | Discussion on 64QAM support in V2X phase 2 | CATT | imported from 3GU |
R1‑1803726 | Discussion on Tx diversity schemes in PC5 | CATT | imported from 3GU |
R1‑1803727 | Discussion on resource pool sharing between mode 3 and mode 4 | CATT | imported from 3GU |
R1‑1803728 | Discussion on latency reduction between packet arrival and resource selection | CATT | imported from 3GU |
R1‑1803729 | Remaining Issues on Synchronization Signal | CATT | imported from 3GU |
R1‑180373 | - | - | - |
R1‑1803730 | Remaining Issues on RMSI | CATT | imported from 3GU |
R1‑1803731 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1803732 | Further details on NR RACH format | CATT | imported from 3GU |
R1‑1803733 | Further details on NR 4-step RA Procedure | CATT | imported from 3GU |
R1‑1803734 | Remaining Issues on NR Mobility Management | CATT | imported from 3GU |
R1‑1803735 | Remaining Issues on NR Radio Link Monitoring | CATT | imported from 3GU |
R1‑1803736 | Remaining issues on codeword mapping | CATT | imported from 3GU |
R1‑1803737 | WF on codeword mapping | CATT | imported from 3GU |
R1‑1803738 | Remaining issues on codebook based UL transmission | CATT | imported from 3GU |
R1‑1803739 | Remaining issues on non-codebook based UL transmission | CATT | imported from 3GU |
R1‑180374 | - | - | - |
R1‑1803740 | Remaining issues on PRB bundling | CATT | imported from 3GU |
R1‑1803741 | On multiplexing of signals and physical channels | CATT | imported from 3GU |
R1‑1803742 | Remaining issues on CSI measurement | CATT | imported from 3GU |
R1‑1803743 | Remaining issues on CSI reporting | CATT | imported from 3GU |
R1‑1803744 | Remaining issues on beam management | CATT | imported from 3GU |
R1‑1803745 | Remaining issues on beam failure recovery | CATT | imported from 3GU |
R1‑1803746 | Remaining issues on CSI-RS | CATT | imported from 3GU |
R1‑1803747 | Remaining issues on DMRS | CATT | imported from 3GU |
R1‑1803748 | Remaining issues on PT-RS | CATT | imported from 3GU |
R1‑1803749 | Remaining issues on SRS | CATT | imported from 3GU |
R1‑180375 | - | - | - |
R1‑1803750 | Remaining issues on QCL | CATT | imported from 3GU |
R1‑1803751 | Remaining details of NR PDCCH search space | CATT | imported from 3GU |
R1‑1803752 | Open issues for semi-static and dynamic slot format indication | CATT | imported from 3GU |
R1‑1803753 | Open issues on DCI formats | CATT | imported from 3GU |
R1‑1803754 | On multiplexing of different UCI transmissions | CATT | imported from 3GU |
R1‑1803755 | Remaining aspects of UCI multiplexing on PUSCH | CATT | imported from 3GU |
R1‑1803756 | Remaining issues on PUCCH resource allocation | CATT | imported from 3GU |
R1‑1803757 | Remaining issues on PDSCH/PUSCH resource allocation | CATT | imported from 3GU |
R1‑1803758 | Remaining issues on NR HARQ timing | CATT | imported from 3GU |
R1‑1803759 | Corrections to CBG-based transmission | CATT | imported from 3GU |
R1‑180376 | - | - | - |
R1‑1803760 | Remaining details of DL pre-emption indication | CATT | imported from 3GU |
R1‑1803761 | Corrections to BWP operation | CATT | imported from 3GU |
R1‑1803762 | Remaining issues on NR CA operation | CATT | imported from 3GU |
R1‑1803763 | Remaining issues of Non-CA based power control | CATT | imported from 3GU |
R1‑1803764 | Parameters setting on virtual PHR for CA | CATT | imported from 3GU |
R1‑1803765 | CQI and MCS design for NR URLLC | CATT | imported from 3GU |
R1‑1803766 | Necessity of a compact DCI format for NR URLLC | CATT | imported from 3GU |
R1‑1803767 | Discussion on enhanced PDCCH for NR URLLC | CATT | imported from 3GU |
R1‑1803768 | Multiplexing of UL transmissions of different reliability requirements | CATT | imported from 3GU |
R1‑1803769 | PUCCH enhancement for URLLC | CATT | imported from 3GU |
R1‑180377 | - | - | - |
R1‑1803770 | PDMA transmitter side signal processing | CATT | imported from 3GU |
R1‑1803771 | Discussion on PDMA receivers | CATT | imported from 3GU |
R1‑1803772 | Discussion on NOMA procedures | CATT | imported from 3GU |
R1‑1803773 | System evaluation assumptions for NOMA | CATT | imported from 3GU |
R1‑1803774 | Link level evaluation results of PDMA | CATT | imported from 3GU |
R1‑1803775 | Discusion on evaluation scenarios of new V2X use cases | CATT | imported from 3GU |
R1‑1803776 | Discussion on channel models of new V2X use cases | CATT | imported from 3GU |
R1‑1803777 | Remaining Issues of Simulation Methodology for NR Unlicensed operations | CATT | imported from 3GU |
R1‑1803778 | Frame Structure for NR Unlicencensed Operations | CATT | imported from 3GU |
R1‑1803779 | Physical Channel Design for NR Unlicensed Operations | CATT | imported from 3GU |
R1‑180378 | - | - | - |
R1‑1803780 | Physical Layer Procedures for NR Unlicensed Operations | CATT | imported from 3GU |
R1‑1803781 | Discussions on evaluation methodologies for link-level and system-level simulations | CATT | imported from 3GU |
R1‑1803782 | Discussions on detailed link budget evaluation methodology | CATT | imported from 3GU |
R1‑1803783 | Discussions on calculation of shadow fading margin for link budget | CATT | imported from 3GU |
R1‑1803784 | Discussions on penetration margin and SD for link budget | CATT | imported from 3GU |
R1‑1803785 | Discussions on system level simulation configurations and technical features for self evaluation | CATT | imported from 3GU |
R1‑1803786 | Initial self evaluation on peak data rate and peak spectrum efficiency | CATT | imported from 3GU |
R1‑1803787 | Initial self evaluation for Indoor Hotspot-eMBB | CATT | imported from 3GU |
R1‑1803788 | Initial self evaluation for Dense Urban-eMBB | CATT | imported from 3GU |
R1‑1803789 | Initial self evaluation for Rural-eMBB | CATT | imported from 3GU |
R1‑180379 | - | - | - |
R1‑1803790 | PDCCH structure remaining issues | ZTE, Sanechips | imported from 3GU |
R1‑1803791 | Search space design and related issues | ZTE, Sanechips | imported from 3GU |
R1‑1803792 | Remaining issues for slot format | ZTE, Sanechips | imported from 3GU |
R1‑1803793 | Remaining issues on DCI content | ZTE, Sanechips | imported from 3GU |
R1‑1803794 | Remaining issues on short PUCCH | ZTE, Sanechips | imported from 3GU |
R1‑1803795 | Issues related to Long PUCCH | ZTE, Sanechips | imported from 3GU |
R1‑1803796 | Remaining issues for data resource allocation | ZTE, Sanechips | imported from 3GU |
R1‑1803797 | Remaining issues for UL data transmission procedure | ZTE, Sanechips | imported from 3GU |
R1‑1803798 | Issues for scell BWP | ZTE, Sanechips | imported from 3GU |
R1‑1803799 | Remaining aspects for rate matching | ZTE, Sanechips | imported from 3GU |
R1‑180380 | - | - | - |
R1‑1803800 | Considerations on CQI /MCS table(s) and related aspects for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1803801 | NR compact DCI format for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1803802 | Discussion on PDCCH repetition for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1803803 | UL multiplexing of transmissions with different reliability requirements | ZTE, Sanechips | imported from 3GU |
R1‑1803804 | Remaining aspects on wake-up signals for efeMTC | vivo | imported from 3GU |
R1‑1803805 | Remaining aspects on wake-up signals for feNB-IoT | vivo | imported from 3GU |
R1‑1803806 | Remaining issues on synchronization signal | vivo | imported from 3GU |
R1‑1803807 | Remaining aspects on NR-PBCH | vivo | imported from 3GU |
R1‑1803808 | Discussion on Remaining Minimum System Information | vivo | imported from 3GU |
R1‑1803809 | Remaining issues on RACH procedure | vivo | imported from 3GU |
R1‑180381 | - | - | - |
R1‑1803810 | Remaining issues on RRM measurement | vivo | imported from 3GU |
R1‑1803811 | Remaining issues on layer mapping | vivo | imported from 3GU |
R1‑1803812 | Remaining issues on codebook based UL transmission | vivo | imported from 3GU |
R1‑1803813 | Remaining issues on non-codebook based UL transmission | vivo | imported from 3GU |
R1‑1803814 | Remaining issues on PRB bundling | vivo | imported from 3GU |
R1‑1803815 | Remaining issues on CSI measurement | vivo | imported from 3GU |
R1‑1803816 | Remaining issues on CSI reporting | vivo | imported from 3GU |
R1‑1803817 | Remaining issues on beam measurement and reporting | vivo | imported from 3GU |
R1‑1803818 | Remaining issues on mechanism to recover from beam failure | vivo | imported from 3GU |
R1‑1803819 | Remaining issues for CQI and MCS | vivo | imported from 3GU |
R1‑180382 | - | - | - |
R1‑1803820 | Remaining issues on simultaneous reception of DL/UL physical channels and reference signals | vivo | imported from 3GU |
R1‑1803821 | Remaining issues on multiplexing of different types of RSs | vivo | imported from 3GU |
R1‑1803822 | Remaining issues on CSI-RS | vivo | imported from 3GU |
R1‑1803823 | Remaining issues on DMRS | vivo | imported from 3GU |
R1‑1803824 | Remaining issues on PT-RS | vivo | imported from 3GU |
R1‑1803825 | Remaining issues on SRS | vivo | imported from 3GU |
R1‑1803826 | Remaining issues on TRS | vivo | imported from 3GU |
R1‑1803827 | Remaining issues on QCL | vivo | imported from 3GU |
R1‑1803828 | Remaining issues on PDCCH search space | vivo | imported from 3GU |
R1‑1803829 | Remaining issues on GC-PDCCH | vivo | imported from 3GU |
R1‑180383 | - | - | - |
R1‑1803830 | Remaining issues on DCI formats | vivo | imported from 3GU |
R1‑1803831 | On compact DCI | vivo | imported from 3GU |
R1‑1803832 | Remaining issues on PUCCH with short-duration | vivo | imported from 3GU |
R1‑1803833 | Remaining issues on PUCCH with long-duration | vivo | imported from 3GU |
R1‑1803834 | Remaining issues on UCI multiplexing | vivo | imported from 3GU |
R1‑1803835 | Remaining issues PUCCH resource allocation | vivo | imported from 3GU |
R1‑1803836 | Remaining issues on resource allocation | vivo | imported from 3GU |
R1‑1803837 | Remaining issues on HARQ management | vivo | imported from 3GU |
R1‑1803838 | Remaining issues on UL data transmission procedure | vivo | imported from 3GU |
R1‑1803839 | Remaining issues on Multiplexing data with different transmission durations | vivo | imported from 3GU |
R1‑180384 | - | - | - |
R1‑1803840 | Remaining issues on BWP operation | vivo | imported from 3GU |
R1‑1803841 | Other aspects on carrier aggregation | vivo | imported from 3GU |
R1‑1803842 | Remaining issues on non-CA UL power control | vivo | imported from 3GU |
R1‑1803843 | Remaining issues on CA UL power control | vivo | imported from 3GU |
R1‑1803844 | Discussion on Rel-15 NR UE features | vivo | imported from 3GU |
R1‑1803845 | Discussion on CSI report for URLLC | vivo | imported from 3GU |
R1‑1803846 | Discussion on compact DCI for URLLC | vivo | imported from 3GU |
R1‑1803847 | Discussion on PDCCH repetition for URLLC | vivo | imported from 3GU |
R1‑1803848 | Discussion on handling UL multiplexing of transmissions with different reliability requirements | vivo | imported from 3GU |
R1‑1803849 | Other aspects for URLLC | vivo | imported from 3GU |
R1‑180385 | - | - | - |
R1‑1803850 | Discussion on NOMA transmitters | vivo | imported from 3GU |
R1‑1803851 | Receiver design considerations for NOMA | vivo | imported from 3GU |
R1‑1803852 | Discussion on NOMA procedures | vivo | imported from 3GU |
R1‑1803853 | Evaluations for NOMA | vivo | imported from 3GU |
R1‑1803854 | Discussion on eV2X evaluation scenarios | vivo | imported from 3GU |
R1‑1803855 | Frame structure for NR-U operation | vivo | imported from 3GU |
R1‑1803856 | Discussion on physical layer channel design in unlicensed spectrum | vivo | imported from 3GU |
R1‑1803857 | Discussion on the channel access procedures | vivo | imported from 3GU |
R1‑1803858 | Design considerations for standalone operation in NR unlicensed spectrum | vivo | imported from 3GU |
R1‑1803859 | Measurement results and analysis on UE power consumption | vivo | imported from 3GU |
R1‑180386 | - | - | - |
R1‑1803860 | NR UE power saving | vivo | imported from 3GU |
R1‑1803861 | Corrections to sTTI and SPT implementation | Ericsson | imported from 3GU |
R1‑1803862 | Introduction of PUSCH sub-PRB allocation | Ericsson | imported from 3GU |
R1‑1803863 | Introduction Rel-15 Further NB-IoT enhancements | Ericsson | imported from 3GU |
R1‑1803864 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE | Ericsson | imported from 3GU |
R1‑1803865 | Draft CR to 38.211 | Ericsson | imported from 3GU |
R1‑1803866 | On functions of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1803867 | On configurations and procedures of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1803868 | On detailed design and evaluations of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1803869 | Design for physical layer scheduling request | Huawei, HiSilicon | imported from 3GU |
R1‑180387 | - | - | - |
R1‑1803870 | On support of semi-persistent scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1803871 | Early data transmission in RACH for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1803872 | Common aspects for TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1803873 | On downlink TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1803874 | On uplink TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1803875 | Remaining details of NB-IoT measurements improvement | Huawei, HiSilicon | imported from 3GU |
R1‑1803876 | On the support of NB-IoT small cell | Huawei, HiSilicon | imported from 3GU |
R1‑1803877 | Reduction of NB-IoT synchronization time | Huawei, HiSilicon | imported from 3GU |
R1‑1803878 | Reduction of NB-IoT system information acquisition time | Huawei, HiSilicon | imported from 3GU |
R1‑1803879 | NPRACH enhancement for cell radius extension | Huawei, HiSilicon | imported from 3GU |
R1‑180388 | - | - | - |
R1‑1803880 | On NPRACH false alarm reduction due to inter-cell interference | Huawei, HiSilicon | imported from 3GU |
R1‑1803881 | On NPUSCH uplink compensation gaps for 2 HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑1803882 | List of L1 parameters for further enhancements of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1803883 | Cell search and system information acquisition improvements in eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1803884 | Early data transmission for eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1803885 | On 'wake-up signal' for eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1803886 | Further considerations on HARQ-ACK feedback for PUSCH in eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1803887 | On Sub-RB resource allocation for MTC PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1803888 | On more flexible starting PRB for PDSCH/PUSCH resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1803889 | Uplink Power control for aerial UEs | Huawei, HiSilicon | imported from 3GU |
R1‑180389 | - | - | - |
R1‑1803890 | Remaining issues for resource selection in mode 4 CA | ZTE, Sanechips | imported from 3GU |
R1‑1803891 | Remaining issues for synchronization in Sidelink CA | ZTE, Sanechips | imported from 3GU |
R1‑1803892 | Discussion on transmit diversity for PC5 | ZTE, Sanechips | imported from 3GU |
R1‑1803893 | Evaluation results of TxD | ZTE, Sanechips | imported from 3GU |
R1‑1803894 | Support for 64 QAM | ZTE, Sanechips | imported from 3GU |
R1‑1803895 | Resource pool sharing between mode 3 and mode 4 | ZTE , Sanechips | imported from 3GU |
R1‑1803896 | Consideration for maximum time reduction between packet arrival at layer 1 and resource selection for transmission | ZTE, Sanechips | imported from 3GU |
R1‑1803897 | NR eV2X evaluation methodology | ZTE, Sanechips | imported from 3GU |
R1‑1803898 | Consideration of Blockage in eV2X Channel Modeling | ZTE, Sanechips | imported from 3GU |
R1‑1803899 | NR eV2X link level simulation assumptions | ZTE , Sanechips | imported from 3GU |
R1‑180390 | - | - | - |
R1‑1803900 | Underlay SR: a complementary solution to overcome the limitations of periodic PUCCH-SR | Idaho National Laboratory | imported from 3GU |
R1‑1803901 | Corrections for shortened processing time and shortened TTI in 36.213, s00-s05 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1803902 | Corrections for shortened processing time and shortened TTI in 36.213, s06-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1803903 | Corrections for shortened processing time and shortened TTI in 36.213, s10-s13 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1803904 | Corrections for shortened processing time and shortened TTI in 36.213, s14-xx | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1803905 | Remaining issues on non-codebook based UL transmission | ZTE, Sanechips | imported from 3GU |
R1‑1803906 | Remaining issues on PRB bundling | ZTE, Sanechips | imported from 3GU |
R1‑1803907 | Remaining issues on CSI measurement | ZTE, Sanechips | imported from 3GU |
R1‑1803908 | Remaining issues on beam management | ZTE, Sanechips | imported from 3GU |
R1‑1803909 | Remaining issues on beam recovery | ZTE, Sanechips | imported from 3GU |
R1‑180391 | - | - | - |
R1‑1803910 | Simultaneous transmission and reception of channels/signals | ZTE, Sanechips | imported from 3GU |
R1‑1803911 | Remaining issues on DMRS | ZTE, Sanechips | imported from 3GU |
R1‑1803912 | Remaining issues on PT-RS | ZTE, Sanechips | imported from 3GU |
R1‑1803913 | Remaining issues on SRS | ZTE, Sanechips | imported from 3GU |
R1‑1803914 | Remaining issues on TRS | ZTE, Sanechips | imported from 3GU |
R1‑1803915 | Remaining issues on QCL | ZTE, Sanechips | imported from 3GU |
R1‑1803916 | Remaining issues on NR power control in non-CA aspects | ZTE, Sanechips | imported from 3GU |
R1‑1803917 | Remaining issues on NR power control in CA aspects | ZTE, Sanechips | imported from 3GU |
R1‑1803918 | Updated Coexistence Evaluation Assumptions | CableLabs | imported from 3GU |
R1‑1803919 | CQI and MCS Tables for URLLC | Ericsson | imported from 3GU |
R1‑180392 | - | - | - |
R1‑1803920 | On Compact DCI for URLLC | Ericsson | imported from 3GU |
R1‑1803921 | On PDCCH Repetition for URLLC | Ericsson | imported from 3GU |
R1‑1803922 | On Pre-emption in Uplink | Ericsson | imported from 3GU |
R1‑1803923 | Channel Coding Techniques for URLLC | Ericsson | imported from 3GU |
R1‑1803924 | On PUCCH for Ultra-Reliable Transmission | Ericsson | imported from 3GU |
R1‑1803925 | On Performance of PUCCH Format 0 for URLLC Use Cases | Ericsson | imported from 3GU |
R1‑1803926 | On Performance of PUCCH Format 2 for URLLC Use Cases | Ericsson | imported from 3GU |
R1‑1803927 | On Frequency Hopping for Ultra-reliable Transmission | Ericsson | imported from 3GU |
R1‑1803928 | On Transmit Diversity for Ultra-high Reliability Use Cases | Ericsson | imported from 3GU |
R1‑1803929 | URLLC Downlink System Level Simulation Results | Ericsson | imported from 3GU |
R1‑180393 | - | - | - |
R1‑1803930 | On Supporting Reliable HARQ Feedback for UL Transmission with Configured Grant | Ericsson | imported from 3GU |
R1‑1803931 | UCI Transmission for URLLC | Ericsson | imported from 3GU |
R1‑1803932 | Evaluation of Reliability in NR | Ericsson | imported from 3GU |
R1‑1803933 | Evaluation of UP latency in NR | Ericsson | imported from 3GU |
R1‑1803934 | Precoder Update for SPS UL | Ericsson | imported from 3GU |
R1‑1803935 | Priority Rules for UL Transmission with Configured Grant | Ericsson | imported from 3GU |
R1‑1803936 | Indication of URLLC Configuration | Ericsson | imported from 3GU |
R1‑1803937 | Remaining Issues of Channel Coding | Ericsson | imported from 3GU |
R1‑1803938 | Remaining Issues of Soft Buffer Management | Ericsson | imported from 3GU |
R1‑1803939 | Ambiguities about PUCCH beam indication | Fujitsu | imported from 3GU |
R1‑180394 | - | - | - |
R1‑1803940 | Discussion on remaining details on PT-RS | Fujitsu | imported from 3GU |
R1‑1803941 | Frequency domain field interpretation for fallback DCI in DL | Fujitsu | imported from 3GU |
R1‑1803942 | Simulation results on PDSCH repetition and new MCS for DL URLLC | Fujitsu | imported from 3GU |
R1‑1803943 | PDCCH repetition for URLLC transmissions | Fujitsu | imported from 3GU |
R1‑1803944 | On UL multiplexing of transmissions with different reliability requirements | Fujitsu | imported from 3GU |
R1‑1803945 | UCI piggyback on PUSCH with URLLC data | Fujitsu | imported from 3GU |
R1‑1803946 | Considerations on NOMA related procedures | Fujitsu | imported from 3GU |
R1‑1803947 | Flexible starting transmission point for NR-U | Fujitsu | imported from 3GU |
R1‑1803948 | Considerations for Simulation Methodology for NR-U Operation | ZTE, Sanechips | imported from 3GU |
R1‑1803949 | Discussion on frame structure and scheduling for NR-U | ZTE, Sanechips | imported from 3GU |
R1‑180395 | - | - | - |
R1‑1803950 | Design on Signal and channel for NR-U | ZTE, Sanechips | imported from 3GU |
R1‑1803951 | Considerations on RS/channel design and measurement for NR-U | ZTE, Sanechips | imported from 3GU |
R1‑1803952 | Design of Channel access mechanism for NR-U | ZTE, Sanechips | imported from 3GU |
R1‑1803953 | Considerations on NOMA schemes | Google, Inc. | imported from 3GU |
R1‑1803954 | Corrections on shortened processing time and shortened TTI in 36 212 | Huawei | imported from 3GU |
R1‑1803955 | Correction on DMRS scrambling ID for semi-open loop transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1803956 | Correction on DMRS scrambling ID for semi-open loop transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1803957 | On support of SRS antenna switching for 1T4R and 2T4R antenna configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1803958 | On support of PUSCH antenna selection for 1T4R and 2T4R antenna configurations | Huawei, HiSilicon | imported from 3GU |
R1‑1803959 | Introduction of SRS antenna switching for 4 ports in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑180396 | - | - | - |
R1‑1803960 | Introduction of FeLAA into 36.212 | Huawei | imported from 3GU |
R1‑1803961 | Introduction of high capacity stationary wireless link and 1024QAM into 36.212 | Huawei | imported from 3GU |
R1‑1803962 | Discussion on PDSCH repetition for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1803963 | On UL SPS repetition for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1803964 | Discussion on QCL across CCs | ITRI | imported from 3GU |
R1‑1803965 | Discussion on DCI format 0-0/0-1 | ITRI | imported from 3GU |
R1‑1803966 | Discussion on bandwidth part operation | ITRI | imported from 3GU |
R1‑1803967 | Remaining issues on codebook based UL transmission | OPPO | imported from 3GU |
R1‑1803968 | Remaining issues on non-codebook based UL transmission | OPPO | imported from 3GU |
R1‑1803969 | Remaining issues on CSI-RS design | OPPO | imported from 3GU |
R1‑180397 | - | - | - |
R1‑1803970 | Remaining issues on DMRS design | OPPO | imported from 3GU |
R1‑1803971 | Remaining issues on SRS design | OPPO | imported from 3GU |
R1‑1803972 | Remaining issues on uplink power control for non-CA | OPPO | imported from 3GU |
R1‑1803973 | Frame structure for NR-U | OPPO | imported from 3GU |
R1‑1803974 | Views on physical layer channel design for NR-U | OPPO | imported from 3GU |
R1‑1803975 | Views on physical layer procedures for NR-U | OPPO | imported from 3GU |
R1‑1803976 | Channel access mechanisms on NR-U | OPPO | imported from 3GU |
R1‑1803977 | SS/PBCH block transmission on NR-U | OPPO | imported from 3GU |
R1‑1803978 | Discussion on SS/PBCH block waveform for NR-U | OPPO | imported from 3GU |
R1‑1803979 | Paging transmission on NR-U | OPPO | imported from 3GU |
R1‑180398 | - | - | - |
R1‑1803980 | HARQ procedure on NR-U | OPPO | imported from 3GU |
R1‑1803981 | Remaining issues on CSI measurement | OPPO | imported from 3GU |
R1‑1803982 | Evaluation on DMRS performance in high mobility scenario | OPPO | imported from 3GU |
R1‑1803983 | Carrier and resource selection in eV2X carrier aggregation | OPPO | imported from 3GU |
R1‑1803984 | Synchronization in eV2X carrier aggregation | OPPO | imported from 3GU |
R1‑1803985 | Transmit diversity scheme in eV2X | OPPO | imported from 3GU |
R1‑1803986 | Discussion of resource pool sharing between mode 3 and mode 4 | OPPO | imported from 3GU |
R1‑1803987 | Latency reduction for eV2X | OPPO | imported from 3GU |
R1‑1803988 | Remaining issues on Search Space | OPPO | imported from 3GU |
R1‑1803989 | Remaining issues on GC-PDCCH | OPPO | imported from 3GU |
R1‑180399 | - | - | - |
R1‑1803990 | Discussion of resource allocation for IAB | OPPO | imported from 3GU |
R1‑1803991 | Remaing issues on RMSI | OPPO | imported from 3GU |
R1‑1803992 | Remaining details on NR paging | OPPO | imported from 3GU |
R1‑1803993 | Remaining details on NR RRM | OPPO | imported from 3GU |
R1‑1803994 | Remaining details on NR RLM | OPPO | imported from 3GU |
R1‑1803995 | On downlink channel power efficiency for efeMTC | OPPO | imported from 3GU |
R1‑1803996 | On wake-up signal design | OPPO | imported from 3GU |
R1‑1803997 | On synchronization raster indication | OPPO | imported from 3GU |
R1‑1803998 | Power offset between SS/PBCH block and PDCCH | OPPO | imported from 3GU |
R1‑1803999 | Text Proposal for DL PRB Bundling | OPPO | imported from 3GU |
R1‑180400 | - | - | - |
R1‑1804000 | Text Proposal for Beam Management | OPPO | imported from 3GU |
R1‑1804001 | Text Proposal for Beam Failure Recovery | OPPO | imported from 3GU |
R1‑1804002 | Discussion on simultaneous receptions/transmissions of multiple signals/channels | OPPO | imported from 3GU |
R1‑1804003 | Text Proposal for CSI-RS for Time/frequency Tracking | OPPO | imported from 3GU |
R1‑1804004 | Text Proposal for QCL | OPPO | imported from 3GU |
R1‑1804005 | Multiplexing of HARQ-ACK and SR | OPPO | imported from 3GU |
R1‑1804006 | Remaining issues on CSI reporting using PUCCH | OPPO | imported from 3GU |
R1‑1804007 | Remaining details on UCI multiplexing | OPPO | imported from 3GU |
R1‑1804008 | Remaining details on HARQ-ACK transmission | OPPO | imported from 3GU |
R1‑1804009 | CQI and MCS design for URLLC | OPPO | imported from 3GU |
R1‑180401 | - | - | - |
R1‑1804010 | DCI design for URLLC | OPPO | imported from 3GU |
R1‑1804011 | PDCCH repetition for URLLC | OPPO | imported from 3GU |
R1‑1804012 | Low-latency transmission for uplink | OPPO | imported from 3GU |
R1‑1804013 | Remaining issues on grant free | OPPO | imported from 3GU |
R1‑1804014 | Remaining issues on CSI reporting | OPPO | imported from 3GU |
R1‑1804015 | Remaining issues on resource allocation for PUCCH | OPPO | imported from 3GU |
R1‑1804016 | Remaining issues on multi-slot resource allocation | OPPO | imported from 3GU |
R1‑1804017 | Other aspects on bandwidth parts | OPPO | imported from 3GU |
R1‑1804018 | V2X Sidelink CA Scheduling issues in Mode 4 | ITRI | imported from 3GU |
R1‑1804019 | Synchronization for Sidelink Carrier Aggregation in V2X Phase 2 | ITRI | imported from 3GU |
R1‑180402 | - | - | - |
R1‑1804020 | Discussion on Resource Pool Sharing between Mode 3 and Mode 4 in V2X commuincation | ITRI | imported from 3GU |
R1‑1804021 | Considerations of Latency Reduction between Packet Arrival and Resource Selection | ITRI | imported from 3GU |
R1‑1804022 | Considerations on NR-eV2X evaluation scenarios | OPPO | imported from 3GU |
R1‑1804023 | On some remaining issues in channel modelling | OPPO | imported from 3GU |
R1‑1804024 | Updated UMi calibration results for user experience data rate in the multi-layer network deployment | ZTE, Sanechips | imported from 3GU |
R1‑1804025 | Updated DL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1804026 | Link curve performance of LDPC coding in IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1804027 | Considerations on the evaluated details and parameters for IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1804028 | Updated UL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1804029 | Consideration on Evaluation methodology of IMT-2020 self-evaluation | ZTE, Sanechips | imported from 3GU |
R1‑180403 | - | - | - |
R1‑1804030 | Initial consideration on Evaluation of mobility and reliability of IMT-2020 self-evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1804031 | Remaining details on search space | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804032 | Collision between PRACH transmission and SR transmission | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804033 | Discussion about number of DCI format size | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804034 | Discussion about semi static codebook | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804035 | Remaining issues on beam management | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804036 | Remaining issues on beam failure recovery procedure | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804037 | Potential solutions and techniques for NR unlicensed | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804038 | Low PAPR SFBC for V2X transmit diversity | Mitsubishi Electric RCE | imported from 3GU |
R1‑1804039 | Virtual PHR derivation in some situations | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑180404 | - | - | - |
R1‑1804040 | Low PAPR SFBC evaluations for PSSCH | Mitsubishi Electric RCE | imported from 3GU |
R1‑1804041 | Remaining issues on RRM | MediaTek Inc. | imported from 3GU |
R1‑1804042 | Remaining issues on RLM | MediaTek Inc. | imported from 3GU |
R1‑1804043 | Remaining issues on search space | MediaTek Inc. | imported from 3GU |
R1‑1804044 | Remaining issues in GC-PDCCH | MediaTek Inc. | imported from 3GU |
R1‑1804045 | Remaining issues on DCI contents and formats | MediaTek Inc. | imported from 3GU |
R1‑1804046 | Remaining issues in carrier aggregation | MediaTek Inc. | imported from 3GU |
R1‑1804047 | Remaining details on RACH procedure | MediaTek Inc. | imported from 3GU |
R1‑1804048 | Remaining TA related issues | MediaTek Inc. | imported from 3GU |
R1‑1804049 | Remaining details on bandwidth part operation | MediaTek Inc. | imported from 3GU |
R1‑180405 | - | - | - |
R1‑1804050 | Remaining issues on synchronization signals | MediaTek Inc. | imported from 3GU |
R1‑1804051 | Remaining issues on NR-PBCH | MediaTek Inc. | imported from 3GU |
R1‑1804052 | Remaining issues on RMSI | MediaTek Inc. | imported from 3GU |
R1‑1804053 | Remaining issues on OSI | MediaTek Inc. | imported from 3GU |
R1‑1804054 | Remaining issue on Paging | MediaTek Inc. | imported from 3GU |
R1‑1804055 | Discussion on NR UE Feature List | MediaTek Inc. | imported from 3GU |
R1‑1804056 | Non-codebook based transmission for UL | MediaTek Inc. | imported from 3GU |
R1‑1804057 | Remaining issues in CSI reporting | MediaTek Inc. | imported from 3GU |
R1‑1804058 | Remaining issues in beam management | MediaTek Inc. | imported from 3GU |
R1‑1804059 | Remaining issues in beam failure recovery | MediaTek Inc. | imported from 3GU |
R1‑180406 | - | - | - |
R1‑1804060 | Views on multi-CC QCL assumptions | MediaTek Inc. | imported from 3GU |
R1‑1804061 | Remaining issues in SRS | MediaTek Inc. | imported from 3GU |
R1‑1804062 | On simulation methodology for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1804063 | On frame structure design for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1804064 | On physical later channel design for NR-U operation | MediaTek Inc. | imported from 3GU |
R1‑1804065 | Discussion on potential physical layer procedures in NR-U | MediaTek Inc. | imported from 3GU |
R1‑1804066 | Remaining issues of long-PUCCH | MediaTek Inc. | imported from 3GU |
R1‑1804067 | Remaining issues of UCI on PUSCH | MediaTek Inc. | imported from 3GU |
R1‑1804068 | Remaining issues of DL/UL scheduling and HARQ management | MediaTek Inc. | imported from 3GU |
R1‑1804069 | Remaining issues of UL power control | MediaTek Inc. | imported from 3GU |
R1‑180407 | - | - | - |
R1‑1804070 | Considerations of UE power saving for NR | MediaTek Inc. | imported from 3GU |
R1‑1804071 | On PDCCH Repetition for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1804072 | Remaining issues on PRB bundling | MediaTek Inc. | imported from 3GU |
R1‑1804073 | Remaining issues on multiplexing | MediaTek Inc. | imported from 3GU |
R1‑1804074 | Remaining issues on CSI-RS | MediaTek Inc. | imported from 3GU |
R1‑1804075 | Remaining issues on DMRS | MediaTek Inc. | imported from 3GU |
R1‑1804076 | Remaining issues on PT-RS | MediaTek Inc. | imported from 3GU |
R1‑1804077 | Remaining issues on TRS | MediaTek Inc. | imported from 3GU |
R1‑1804078 | On CQI and MCS Design for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1804079 | On Compact DCI Design for URLLC | MediaTek Inc. | imported from 3GU |
R1‑180408 | - | - | - |
R1‑1804080 | On UL Multiplexing for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1804081 | On Grant-Free Transmission Framework for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1804082 | Remaining Issues on DL/UL Resource Allocation | MediaTek Inc. | imported from 3GU |
R1‑1804083 | Remaining issues on pre-emption indication | MediaTek Inc. | imported from 3GU |
R1‑1804084 | Power control details for multiplexing UL eMBB and URLLC | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804085 | PHY notification for beam failure instance | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804086 | Remaining issues for preemption indication | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1804087 | Discussion on remaining issues for DL CE Level determination in NB-IoT | CMCC | imported from 3GU |
R1‑1804088 | Discussion on UL power control for Aerial Vehicles | CMCC | imported from 3GU |
R1‑1804089 | Discussion on power offset for PBCH and PDCCH | CMCC | imported from 3GU |
R1‑180409 | - | - | - |
R1‑1804090 | Discussion on remaining issues for RMSI | CMCC | imported from 3GU |
R1‑1804091 | Discussion on remaining issues for PRACH configuration table | CMCC | imported from 3GU |
R1‑1804092 | Discussion on time period for SSB to RO association | CMCC | imported from 3GU |
R1‑1804093 | Discussion on remaining issues on semi-persistent CSI | CMCC | imported from 3GU |
R1‑1804094 | Discussion on remaining issues on beam failure recovery | CMCC | imported from 3GU |
R1‑1804095 | Discussion on remaining issues on DMRS | CMCC | imported from 3GU |
R1‑1804096 | Discussion on remaining issues on PT-RS | CMCC | imported from 3GU |
R1‑1804097 | Discussion on remaining issues on SRS | CMCC | imported from 3GU |
R1‑1804098 | Discussion on PDCCH blind decoding dropping rule | CMCC | imported from 3GU |
R1‑1804099 | Discussion on remaining issues for DCI | CMCC | imported from 3GU |
R1‑180410 | - | - | - |
R1‑1804100 | Discussion on PUCCH repetition | CMCC | imported from 3GU |
R1‑1804101 | Discussion on remaining issues for time domain resource allocation | CMCC | imported from 3GU |
R1‑1804102 | Discussion on HARQ timing for DL SPS | CMCC | imported from 3GU |
R1‑1804103 | Discussion on PUSCH repetition for grant-free transmission | CMCC | imported from 3GU |
R1‑1804104 | Discussion on power control signalling | CMCC | imported from 3GU |
R1‑1804105 | Discussion on BLER requirement for URLLC | CMCC | imported from 3GU |
R1‑1804106 | Discussion on handling for UL URLLC and eMBB collision issue | CMCC | imported from 3GU |
R1‑1804107 | Considerations on Rel-15 NoMA transmitter design | CMCC | imported from 3GU |
R1‑1804108 | Discussion on SLS Evaluation Methodology and Assumptions for R15 NoMA | CMCC | imported from 3GU |
R1‑1804109 | Discussion on evaluation assumption for NR-U | CMCC | imported from 3GU |
R1‑180411 | - | - | - |
R1‑1804110 | Discussion on deployment scenario and requirement for IAB | CMCC | imported from 3GU |
R1‑1804111 | Initial self evaluation results for mobility in eMBB scenario | CMCC | imported from 3GU |
R1‑1804112 | Initial self evaluation results for connection density in mMTC scenario | CMCC | imported from 3GU |
R1‑1804113 | Initial self evaluation results for reliability in URLLC scenario | CMCC | imported from 3GU |
R1‑1804114 | Initial link-level self evaluation results for Mobility in eMBB scenario | CMCC | imported from 3GU |
R1‑1804115 | PUCCH resource allocation prior to RRC configuration | NEC | imported from 3GU |
R1‑1804116 | Discussion on NoMA Schemes for NR | NEC | imported from 3GU |
R1‑1804117 | Considerations on NOMA related procedures | NEC | imported from 3GU |
R1‑1804118 | Enhancements on Type-II CSI Reporting Scheme | Fraunhofer IIS, Fraunhofer HHI | imported from 3GU |
R1‑1804119 | Draft RRC parameter list for L1 configuration of Rel-15 LTE-MTC | Ericsson | imported from 3GU |
R1‑180412 | - | - | - |
R1‑1804120 | Reduced system acquisition time for MTC | Ericsson | imported from 3GU |
R1‑1804121 | Early data transmission for MTC | Ericsson | imported from 3GU |
R1‑1804122 | Downlink channel power efficiency for MTC | Ericsson | imported from 3GU |
R1‑1804123 | Uplink HARQ-ACK feedback for MTC | Ericsson | imported from 3GU |
R1‑1804124 | PUSCH sub-PRB allocation for MTC | Ericsson | imported from 3GU |
R1‑1804125 | Flexible PDSCH/PUSCH starting PRB for MTC | Ericsson | imported from 3GU |
R1‑1804126 | Remaining details of PDSCH 64QAM support for MTC | Ericsson | imported from 3GU |
R1‑1804127 | Solutions for Rel-14 and Rel-15 UE Pool sharing | Huawei, HiSilicon | imported from 3GU |
R1‑1804128 | Discussion on latency reduction for eV2X | Huawei, HiSilicon | imported from 3GU |
R1‑1804129 | Remaining details for supporting 64-QAM | Huawei, HiSilicon | imported from 3GU |
R1‑180413 | - | - | - |
R1‑1804130 | Power sharing for UE with limited TX capability | Huawei, HiSilicon | imported from 3GU |
R1‑1804131 | Performance evaluation of transmit diversity for eV2X | Huawei, HiSilicon | imported from 3GU |
R1‑1804132 | Transmit diversity solutions for PSSCH and PSCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1804133 | Remaining details for synchronization for carrier aggregation on sidelink | Huawei, HiSilicon | imported from 3GU |
R1‑1804134 | Discussion on CP Latency | MediaTek Inc. | imported from 3GU |
R1‑1804135 | Modulation Enhancements | MediaTek Inc. | imported from 3GU |
R1‑1804136 | Blind/Harq-less repetitions for scheduled DL-SCH in LTE HRLLC | MediaTek Inc. | imported from 3GU |
R1‑1804137 | Clarification on sREG to sCCE mapping for sTTI | MediaTek Inc. | imported from 3GU |
R1‑1804138 | Wake Up Signal Functionsfor NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1804139 | Wake Up Signal Configuration for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑180414 | - | - | - |
R1‑1804140 | Wake Up Signal Design for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1804141 | Physical Layer Scheduling Request | MediaTek Inc. | imported from 3GU |
R1‑1804142 | L1 Scheduling Request by Semi Persistent Scheduling | MediaTek Inc. | imported from 3GU |
R1‑1804143 | Early Data Transmission TBS Determination | MediaTek Inc. | imported from 3GU |
R1‑1804144 | CSI Report in Msg3 in Random Acces Procedure in NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1804145 | NPUSCH UL gap for 2 HARQ processes | MediaTek Inc. | imported from 3GU |
R1‑1804146 | On downlink channel quality measurement and report in Msg3 | Huawei, HiSilicon | imported from 3GU |
R1‑1804147 | On NPRS for OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑1804148 | Introduction of further enhancements of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1804149 | Introduction of FeMTC into 36.212 | Huawei, HiSilicon | imported from 3GU |
R1‑180415 | - | - | - |
R1‑1804150 | Correction on TPC field in DCI format 6-1A | Huawei, HiSilicon | imported from 3GU |
R1‑1804151 | Correction on Msg3 power control for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1804152 | Wake-up signal functions for NB-IoT | Ericsson | imported from 3GU |
R1‑1804153 | Wake-up signal configurations and procedures for NB-IoT | Ericsson | imported from 3GU |
R1‑1804154 | Detailed design of wake-up signal for NB-IoT | Ericsson | imported from 3GU |
R1‑1804155 | Data transmission during random access procedure for NB-IoT | Ericsson | imported from 3GU |
R1‑1804156 | Physical layer scheduling request for NB-IoT | Ericsson | imported from 3GU |
R1‑1804157 | Semi-persistent scheduling for NB-IoT | Ericsson | imported from 3GU |
R1‑1804158 | Cell search time reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1804159 | System information acquisition time reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑180416 | - | - | - |
R1‑1804160 | Narrowband measurement accuracy improvements for NB-IoT | Ericsson | imported from 3GU |
R1‑1804161 | NB-IoT small cell support | Ericsson | imported from 3GU |
R1‑1804162 | NPRACH false alarm reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1804163 | NPRACH range enhancements for NB-IoT | Ericsson | imported from 3GU |
R1‑1804164 | DL aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1804165 | UL aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1804166 | DL/UL common aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1804167 | On NPRS performance | Ericsson | imported from 3GU |
R1‑1804168 | Remaining issues on DL measurement reporting in NB-IoT | Ericsson | imported from 3GU |
R1‑1804169 | ACMA-OFDM with NR LDPC Code for Uplink NOMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑180417 | - | - | - |
R1‑1804170 | Low PAPR ACMA (SC-FDE) for Uplink NOMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1804171 | ACMA-OFDM for Uplink NOMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1804172 | IAB scenarios and evaluations | ZTE, Sanechips | imported from 3GU |
R1‑1804173 | UCI multiplexing for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1804174 | Remaining issues on system acquisition time reduction for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1804175 | Remaining issues on UL HARQ-ACK feedback for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1804176 | Remaining issues on PUSCH sub-PRB allocation for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1804177 | Discussion on Flexible starting PRB of PUSCH/PDSCH for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1804178 | Details on physical layer SR without HARQ-ACK for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804179 | Considerations on physical layer aspects on SPS in NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑180418 | - | - | - |
R1‑1804180 | Cell search enhancement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804181 | Remaining issues on system information acquisition improvement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804182 | Remaining issues on downlink aspects to support TDD NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804183 | Remaining issues on uplink aspects to support TDD NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804184 | Remaining issues on common aspects to support TDD NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804185 | Considerations on extended Power Headroom report for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804186 | Wake up signal function for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804187 | Remaining issues on wake up signal configuration for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804188 | Details design of wake up signal for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804189 | Power consumption reduction for physical channels for MTC | ZTE, SaneChips | imported from 3GU |
R1‑180419 | - | - | - |
R1‑1804190 | On early data transmission for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804191 | On early data transmission for eMTC | ZTE, SaneChips | imported from 3GU |
R1‑1804192 | On small cell support for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804193 | NPRACH range enhancement | ZTE, SaneChips | imported from 3GU |
R1‑1804194 | NPRACH reliability enhancement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1804195 | Clarification on NPUSCH postponement | ZTE, SaneChips | imported from 3GU |
R1‑1804196 | Correction on PUSCH hopping parameter for eVoLTE | ZTE, CMCC | imported from 3GU |
R1‑1804197 | Remaining issues on CSI-RS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804198 | Remaining issues on DMRS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804199 | Remaining issues on PTRS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑180420 | - | - | - |
R1‑1804200 | Remaining issue for uplink HARQ-ACK feedback in efeMTC | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804201 | Views on TDD downlink aspect | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804202 | Remaining issues on codebook based UL transmission | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804203 | Remaining issues on non-codebook based UL transmission | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804204 | Discussion on Mode 4 support for V2X carrier aggregation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804205 | Discussion on Pool sharing for V2X Phase 2 | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804206 | Discussion on Latency Reduction for V2X Phase 2 | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804207 | Remaining issues for HARQ-ACK feedback timing indication | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804208 | Remaining issues for CA with different numerologies | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804209 | HARQ-ACK transmission on unlicensed carriers | Lenovo, Motorola Mobility | imported from 3GU |
R1‑180421 | - | - | - |
R1‑1804210 | Discussion of beam management for carrier aggregation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804211 | Discussion of beam failure recovery for carrier aggregation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804212 | Multiplexing of different type of UCIs | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804213 | Multiplexing between PUCCH and PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1804214 | On PDCCH candidate priority rules | Spreadtrum Communications | imported from 3GU |
R1‑1804215 | On PDSCH rate-matching when UE configured with WB RS | Spreadtrum Communications | imported from 3GU |
R1‑1804216 | Remaining issues on PT-RS | Spreadtrum Communications | imported from 3GU |
R1‑1804217 | Discussion on possible open issues for PDCCH in URLLC | Spreadtrum Communications | imported from 3GU |
R1‑1804218 | Discussion on SS/PBCH block for NR-U operation | Spreadtrum Communications | imported from 3GU |
R1‑1804219 | Remaining issues on DCI contents and formats | Spreadtrum Communications | imported from 3GU |
R1‑180422 | - | - | - |
R1‑1804220 | Remaining issues on resource allocation for PUCCH | Spreadtrum Communications | imported from 3GU |
R1‑1804221 | Remaining issues on time-domain scheduling | Spreadtrum Communications | imported from 3GU |
R1‑1804222 | Discussion on UL multiplexing of transmissions with different reliability requirements | Spreadtrum Communications | imported from 3GU |
R1‑1804223 | Remaining issues on CSI reporting | Spreadtrum Communications | imported from 3GU |
R1‑1804224 | On URLLC PDCCH simulation | Spreadtrum Communications | imported from 3GU |
R1‑1804225 | Remaining issues on RACH | Spreadtrum Communications | imported from 3GU |
R1‑1804226 | Remaining issues on BWP | Spreadtrum Communications | imported from 3GU |
R1‑1804227 | Remaining issues on HARQ-ACK codebook | Spreadtrum Communications | imported from 3GU |
R1‑1804228 | correction of PUSCH frequency hopping | Spreadtrum Communications | imported from 3GU |
R1‑1804229 | Considerations on NOMA procedures | Spreadtrum Communications | imported from 3GU |
R1‑180423 | - | - | - |
R1‑1804230 | Considerations on the LBT procedures for NR unlicensed band | Spreadtrum Communications | imported from 3GU |
R1‑1804231 | Considerations on Autonomous UL transmission for NR unlicensed band | Spreadtrum Communications | imported from 3GU |
R1‑1804232 | Remaining details on TRS design | Spreadtrum Communications | imported from 3GU |
R1‑1804233 | Sharing Mode 3 and Mode 4 resource pools | NEC | imported from 3GU |
R1‑1804234 | On enhancing reliability of PDCCH | NEC | imported from 3GU |
R1‑1804235 | Discussion on the large scale channel model for NTN | ZTE, Sanechips,CATR | imported from 3GU |
R1‑1804236 | Discussion on the NR impacts on random access for NTN | ZTE, Sanechips,CATR | imported from 3GU |
R1‑1804237 | Enhancements on power control for aerial vehicle | ZTE, Sanechips | imported from 3GU |
R1‑1804238 | Reducing system acquisition time for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804239 | Data transmission during random access procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180424 | - | - | - |
R1‑1804240 | Discussion on search space | Potevio | imported from 3GU |
R1‑1804241 | Discussion on NR unlicensed band operation | Potevio | imported from 3GU |
R1‑1804242 | Discussion on initial access based on beam sweeping in NR-U | Potevio | imported from 3GU |
R1‑1804243 | Wake-up signal for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804244 | Uplink HARQ-ACK feedback in efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804245 | Design of PUSCH Sub-PRB Allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804246 | Support for flexible PDSCH/PUSCH starting PRB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804247 | Remaining issue on supporting DL 64QAM for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804248 | Functions of wake-up signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804249 | Wake-up signal configurations and procedures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180425 | - | - | - |
R1‑1804250 | Considerations for design of wake-up signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804251 | Data transmission during random access procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804252 | Design of physical layer scheduling request | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804253 | Support for semi-persistent scheduling in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804254 | Reducing cell search time for feNB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804255 | Reducing system acquisition time for feNB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804256 | Remaining Details for Mode 4 support for V2X carrier aggregation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804257 | Remaining details of SL CA synchronization | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804258 | Discussions on support of 64QAM for LTE V2X sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804259 | Transmit diversity schemes and evaluations for V2X sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180426 | - | - | - |
R1‑1804260 | On Resource pool sharing between mode-3 and mode-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804261 | Discussion on latency reduction for eV2X | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804262 | Evaluation scenarios of new V2X use cases | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804263 | V2X channel modelling and other issues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804264 | Measurement accuracy improvement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804265 | Small cell support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804266 | NPRACH reliability enhancement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804267 | Handling of PDCCH on rate matching resource | vivo | imported from 3GU |
R1‑1804268 | NPRACH cell range enhancement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804269 | Downlink aspects of TDD support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180427 | - | - | - |
R1‑1804270 | Uplink aspects of TDD support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804271 | Common Aspects of NB-IoT TDD Operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804272 | PHR Enhancement for NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804273 | Remaining issues on PT-RS | Panasonic Corporation | imported from 3GU |
R1‑1804274 | Simulation methodology and assumptions for NR-U evaluation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804275 | Frame structure for NR-U operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804276 | On physical layer channel design for NR unlicensed | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804277 | Physical layer procedure enhancements for NR unlicensed | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804278 | Summary of remaining issues for codebook based transmission for UL MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑1804279 | Remaining issues on PDCCH structure | Huawei, HiSilicon | imported from 3GU |
R1‑180428 | - | - | - |
R1‑1804280 | TP on HARQ-ACK reporting with different numerology | Huawei, HiSilicon | imported from 3GU |
R1‑1804281 | Draft CR on PDSCH/PUSCH DMRS position for ECP in TS38.211 | Huawei, HiSilicon | imported from 3GU |
R1‑1804282 | Draft CR on PDSCH/PUSCH DMRS position for ECP in TS38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑1804283 | Consideration on power saving for NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1804284 | SRS carrier switching involving SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1804285 | On coexistence between LTE and NR | Huawei, HiSilicon | imported from 3GU |
R1‑1804286 | Discussion on PHR for SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1804287 | TP on UCI multiplexing between UL and SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1804288 | TP on power control for concurrent transmission of SRS on both UL and SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1804289 | CSI feedback enhancements for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180429 | - | - | - |
R1‑1804290 | UCI piggyback on PUSCH for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1804291 | PUCCH reliability | Huawei, HiSilicon | imported from 3GU |
R1‑1804292 | Support of 60 kHz subcarrier spacing | Huawei, HiSilicon | imported from 3GU |
R1‑1804293 | PUCCH resource allocation for non-slot scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1804294 | Considerations on DMRS to support URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1804295 | Summary of remaining issues on UL data transmission procedure | Huawei, HiSilicon | imported from 3GU |
R1‑1804296 | Reliability enhancement for grant-free transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1804297 | Discussion on partially overlapped PUCCH and PUSCH for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1804298 | V2X sidelink measurement results | Huawei, HiSilicon | imported from 3GU |
R1‑1804299 | On UE Antenna model in eV2X Evaluation Methodology | Huawei, HiSilicon | imported from 3GU |
R1‑180430 | - | - | - |
R1‑1804300 | Simulation assumptions and preliminary results for NR unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1804301 | Consideration on self evaluation of IMT-2020 for UE energy efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1804302 | Consideration on self evaluation of IMT-2020 for link budget | Huawei, HiSilicon | imported from 3GU |
R1‑1804303 | Evaluation on the dynamic and flexible resouce allocation in IAB | Huawei, HiSilicon | imported from 3GU |
R1‑1804304 | TP for chapter 6 of TR38.811 | Huawei, HiSilicon | imported from 3GU |
R1‑1804305 | Remaining issues of NR UE features | Huawei, HiSilicon | imported from 3GU |
R1‑1804306 | Draft CR on TS38.211 | Huawei, HiSilicon | imported from 3GU |
R1‑1804307 | Draft CR on resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1804308 | Draft CR on TBS | Huawei, HiSilicon | imported from 3GU |
R1‑1804309 | Draft CR on HARQ-ACK codebook | Huawei, HiSilicon | imported from 3GU |
R1‑180431 | - | - | - |
R1‑1804310 | Draft CR on TS38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1804311 | Correction on scheduling and HARQ procedure for case 1 HARQ timing of EN-DC in TS36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1804312 | CR on semi-static HARQ-ACK codebook fallback operation in 38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1804313 | Channel access and co-existence for NR-U operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804314 | Interlace structures for NR-U uplink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804315 | Discussion on measurement report for NB-IoT | Samsung | imported from 3GU |
R1‑1804316 | Discussion on UCI transmission without UL-SCH for PUSCH mode 1 | Samsung | imported from 3GU |
R1‑1804317 | Discussion on UCI transmission on AUL PUSCH | Samsung | imported from 3GU |
R1‑1804318 | mode-4 support in V2X CA | Samsung | imported from 3GU |
R1‑1804319 | Synchronization in V2X CA | Samsung | imported from 3GU |
R1‑180432 | - | - | - |
R1‑1804320 | High order modulation in V2X | Samsung | imported from 3GU |
R1‑1804321 | Transmit diversity schemes for PSSCH | Samsung | imported from 3GU |
R1‑1804322 | Resource pool sharing between mode 3 and mode 4 Ues | Samsung | imported from 3GU |
R1‑1804323 | Support of shorter latency in V2X | Samsung | imported from 3GU |
R1‑1804324 | Discussion on enhanced synchronization signals and resynchronization signals | Samsung | imported from 3GU |
R1‑1804325 | Early data transmission for eMTC | Samsung | imported from 3GU |
R1‑1804326 | DL power consumption reduction for eMTC | Samsung | imported from 3GU |
R1‑1804327 | Group DCI for uplink HARQ-ACK feedback | Samsung | imported from 3GU |
R1‑1804328 | Discussion on sub-PRB allocation for eFeMTC | Samsung | imported from 3GU |
R1‑1804329 | Discussion on Flexible PDSCH/PUSCH starting PRB | Samsung | imported from 3GU |
R1‑180433 | - | - | - |
R1‑1804330 | Discussion on Wake up signal configuraion | Samsung | imported from 3GU |
R1‑1804331 | Wake up signal Design | Samsung | imported from 3GU |
R1‑1804332 | Early data transmission for NB-IOT | Samsung | imported from 3GU |
R1‑1804333 | Discussion on scheduling request for NB IoT | Samsung | imported from 3GU |
R1‑1804334 | New SPS mechanism for power saving | Samsung | imported from 3GU |
R1‑1804335 | Power control for extended coverage UE | Samsung | imported from 3GU |
R1‑1804336 | Reliability enhancements for NPRACH | Samsung | imported from 3GU |
R1‑1804337 | Discussion on DL common channel/signal for TDD NB-IoT | Samsung | imported from 3GU |
R1‑1804338 | Discussion on UL channel for TDD NB-IoT | Samsung | imported from 3GU |
R1‑1804339 | Discussion on 2 HARQ processes and cross carrier scheduling | Samsung | imported from 3GU |
R1‑180434 | - | - | - |
R1‑1804340 | Enhanced PHR for NB-IOT | Samsung | imported from 3GU |
R1‑1804341 | Discussion on PDSCH repetition | Samsung | imported from 3GU |
R1‑1804342 | Discussion on Repetition for UL SPS | Samsung | imported from 3GU |
R1‑1804343 | Corrections on Synchronization Signaling | Samsung | imported from 3GU |
R1‑1804344 | Corrections on NR-PBCH | Samsung | imported from 3GU |
R1‑1804345 | Corrections on Remaining Minimum System Information | Samsung | imported from 3GU |
R1‑1804346 | Corrections on Other System Information Delivery | Samsung | imported from 3GU |
R1‑1804347 | Corrections on Paging Design | Samsung | imported from 3GU |
R1‑1804348 | Corrections on PRACH Formats | Samsung | imported from 3GU |
R1‑1804349 | Corrections on RACH Procedure | Samsung | imported from 3GU |
R1‑180435 | - | - | - |
R1‑1804350 | Corrections on Measurements for Mobility Management | Samsung | imported from 3GU |
R1‑1804351 | Corrections on Radio Link Monitoring for Mobility Management | Samsung | imported from 3GU |
R1‑1804352 | Corrections on Timing Advance | Samsung | imported from 3GU |
R1‑1804353 | Issues on codeword mapping | Samsung | imported from 3GU |
R1‑1804354 | Summary of open issues on codeword mapping | Samsung | imported from 3GU |
R1‑1804355 | Issues on codebook based UL transmisison | Samsung | imported from 3GU |
R1‑1804356 | Open issues on aperiodic CSI-RS for non-codebook-based transmission | Samsung | imported from 3GU |
R1‑1804357 | Issues on CSI reporting | Samsung | imported from 3GU |
R1‑1804358 | Corrections on Beam reporting and Indication | Samsung | imported from 3GU |
R1‑1804359 | Corrections on beam failure recovery | Samsung | imported from 3GU |
R1‑180436 | - | - | - |
R1‑1804360 | Remaining issues on CQI and MCS | Samsung | imported from 3GU |
R1‑1804361 | Aperiodic beam reporting | Samsung | imported from 3GU |
R1‑1804362 | Corrections on UL beam management | Samsung | imported from 3GU |
R1‑1804363 | Simultaneous reception of physical channels and reference signals | Samsung | imported from 3GU |
R1‑1804364 | Remaining issues on RS multiplexing | Samsung | imported from 3GU |
R1‑1804365 | Remaining issues on CSI-RS | Samsung | imported from 3GU |
R1‑1804366 | Remaining issues on DMRS | Samsung | imported from 3GU |
R1‑1804367 | Remaining issues on PTRS | Samsung | imported from 3GU |
R1‑1804368 | Remaining issues on SRS | Samsung | imported from 3GU |
R1‑1804369 | Remaining issues on TRS | Samsung | imported from 3GU |
R1‑180437 | - | - | - |
R1‑1804370 | Corrections on Search Space Design | Samsung | imported from 3GU |
R1‑1804371 | Corrections on UE-Group Common PDCCH | Samsung | imported from 3GU |
R1‑1804372 | DCI Contents and Formats | Samsung | imported from 3GU |
R1‑1804373 | Corrections on PUCCH for up to 2 Symbols | Samsung | imported from 3GU |
R1‑1804374 | Corrections on PUCCH for more than 2 Symbols | Samsung | imported from 3GU |
R1‑1804375 | Corrections on UCI Multiplexing in PUSCH | Samsung | imported from 3GU |
R1‑1804376 | Corrections on Resource Allocation for PUCCH | Samsung | imported from 3GU |
R1‑1804377 | Corrections on DL/UL Resource Allocation | Samsung | imported from 3GU |
R1‑1804378 | Corrections on HARQ Management and Feedback | Samsung | imported from 3GU |
R1‑1804379 | Corrections on CBG-Based UL/DL Retransmissions | Samsung | imported from 3GU |
R1‑180438 | - | - | - |
R1‑1804380 | Corrections on Bandwidth Part Operation | Samsung | imported from 3GU |
R1‑1804381 | Corrections on CA Operation | Samsung | imported from 3GU |
R1‑1804382 | Corrections on Rate Matching | Samsung | imported from 3GU |
R1‑1804383 | Corrections on Channel Coding | Samsung | imported from 3GU |
R1‑1804384 | Corrections on LTE-NR Coexistence | Samsung | imported from 3GU |
R1‑1804385 | Corrections on UL Power Control | Samsung | imported from 3GU |
R1‑1804386 | Corrections on UL Power Control for EN-DC | Samsung | imported from 3GU |
R1‑1804387 | Corrections on PHR calculation for CA | Samsung | imported from 3GU |
R1‑1804388 | UE Features | Samsung | imported from 3GU |
R1‑1804389 | CQI and MCS Tables for URLLC | Samsung | imported from 3GU |
R1‑180439 | - | - | - |
R1‑1804390 | On Need for Additional DCI Format | Samsung | imported from 3GU |
R1‑1804391 | On Need for PDCCH Repetitions | Samsung | imported from 3GU |
R1‑1804392 | Multiplexing of UL transmissions with different reliability requirements | Samsung | imported from 3GU |
R1‑1804393 | Remaining issues on NTN Channel Modeling | Samsung | imported from 3GU |
R1‑1804394 | PT-RS design consideration for NTN | Samsung | imported from 3GU |
R1‑1804395 | Considerations on random access for NTN | Samsung | imported from 3GU |
R1‑1804396 | Transmitter side signal processing schemes for NOMA | Samsung | imported from 3GU |
R1‑1804397 | Considerations on receiver types for NoMA schemes | Samsung | imported from 3GU |
R1‑1804398 | Procedures related consideration to NOMA | Samsung | imported from 3GU |
R1‑1804399 | Considerations on evaluation for NoMA study | Samsung | imported from 3GU |
R1‑180440 | - | - | - |
R1‑1804400 | Evaluation scenarios for NR V2X | Samsung | imported from 3GU |
R1‑1804401 | Channel model for NR V2X | Samsung | imported from 3GU |
R1‑1804402 | Simulation Methodology for NR-U | Samsung | imported from 3GU |
R1‑1804403 | Frame structure for NR-U | Samsung | imported from 3GU |
R1‑1804404 | Potential physical layer channel design for NR-U | Samsung | imported from 3GU |
R1‑1804405 | Potential physical layer procedures for NR-U | Samsung | imported from 3GU |
R1‑1804406 | Necessary Enhancements for NR IAB | Samsung | imported from 3GU |
R1‑1804407 | Evaluation Methodology for NR IAB | Samsung | imported from 3GU |
R1‑1804408 | Evaluation methodology for IMT-2020 Submission | Samsung | imported from 3GU |
R1‑1804409 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.201 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180441 | - | - | - |
R1‑1804410 | Correction on mapping to physical resources for slot-SPUCCH format 1/1a/1b with frequency hopping | Huawei, HiSilicon, Ericsson, LG Electronics | imported from 3GU |
R1‑1804411 | Discussion on subslot-SPUCCH repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1804412 | Corrections on timing from sPDSCH to HARQ-ACK for SSC3,4,8 | Huawei, HiSilicon, Ericsson, LG Electronics | imported from 3GU |
R1‑1804413 | Corrections on HARQ-ACK reporting procedure for FS2 with sTTI | Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑1804414 | Corrections on TBS determination for more than 1 layer | Huawei, HiSilicon, Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804415 | Corrections on DAI in 36.212 | Huawei, HiSilicon, Ericsson, LG Electronics, Qualcomm | imported from 3GU |
R1‑1804416 | Correction on antenna ports quasi co-location for DMRS based SPDCCH | Huawei, HiSilicon, Nokia | imported from 3GU |
R1‑1804417 | Correction on DCI format 7-1E in 36.212 | Huawei, HiSilicon, Ericsson, Nokia | imported from 3GU |
R1‑1804418 | TP on VRB assignment of DL resource allocation type 2 | Huawei, HiSilicon, Nokia, Mediatek, Qualcomm | imported from 3GU |
R1‑1804419 | Correction on sequence generation for UE-specific reference signals associated with slotsubslot based PDSCH | Huawei, HiSilicon, Nokia | imported from 3GU |
R1‑180442 | - | - | - |
R1‑1804420 | Correction on UCI on PUSCH in 36212 | Huawei, HiSilicon, LG Electronics, Qualcomm, Ericsson | imported from 3GU |
R1‑1804421 | Discussion and text proposal on UL resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1804422 | Correction on DL subslot pattern determination | Huawei, HiSilicon | imported from 3GU |
R1‑1804423 | Correction on mapping to physical resources for slot-SPUCCH format 1/1a/1b with frequency hopping | Huawei, HiSilicon, Ericsson, LG Electronics | imported from 3GU |
R1‑1804424 | Discussion on subslot-SPUCCH repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1804425 | Corrections on timing from sPDSCH to HARQ-ACK for SSC3,4,8 | Huawei, HiSilicon, Ericsson, LG Electronics | imported from 3GU |
R1‑1804426 | DCI contents and formats for RMSI/OSI/Paging/RAR | Huawei, HiSilicon | imported from 3GU |
R1‑1804427 | Discussion on partial overlap between PUCCHs | Huawei, HiSilicon | imported from 3GU |
R1‑1804428 | Discussion on the feasibility of High Accuracy Time Synchronization for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1804429 | Discussion on the motivation of High Accuracy Time Synchronization for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180443 | - | - | - |
R1‑1804430 | Remaining issues on CBG-based (re)transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1804431 | Remaining issues on scheduling and HARQ | Huawei, HiSilicon | imported from 3GU |
R1‑1804432 | Discussion and text proposal for HARQ-ACK on PUCCH format 0 | Huawei, HiSilicon | imported from 3GU |
R1‑1804433 | On CGS ordering for NR | Huawei, HiSilicon, ZTE, Sanechips | imported from 3GU |
R1‑1804434 | Discussion on aperiodic CSI feedback on PUCCH in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1804435 | Correction on DL subslot pattern determination | Huawei, HiSilicon | imported from 3GU |
R1‑1804436 | Necessity for specifying UL SPS with repetition to support URLLC in Rel-15 | Huawei, HiSilicon | imported from 3GU |
R1‑1804437 | Preliminary summary of specification impact for supporting UL SPS with repetition | Huawei, HiSilicon | imported from 3GU |
R1‑1804438 | Discussion on CSI feedback for CA SCell New State | Huawei, HiSilicon | imported from 3GU |
R1‑1804439 | Discussion on modulation enhancement for 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑180444 | - | - | - |
R1‑1804440 | Discussion on the configuration of UL 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1804441 | On the configuration of UL 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1804442 | On the configuration of UL 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1804443 | Further discussion on introducing aperiodic TRS | Huawei, HiSilicon | imported from 3GU |
R1‑1804444 | Remaining issues on CQI and MCS | Huawei, HiSilicon | imported from 3GU |
R1‑1804445 | Further enhancements on CSI reporting and codebook design | Huawei, HiSilicon | imported from 3GU |
R1‑1804446 | [Draft] Reply LS on Beam- and Cell- Radio-Link-Monitoring | Huawei, HiSilicon | imported from 3GU |
R1‑1804447 | Antenna selection for PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1804448 | Remaining issues for SRS switching among CCs | Huawei, HiSilicon | imported from 3GU |
R1‑1804449 | Independent Power control for SRS | Huawei, HiSilicon | imported from 3GU |
R1‑180445 | - | - | - |
R1‑1804450 | Uplink Pre-emption for URLLC Reliability | III | imported from 3GU |
R1‑1804451 | Correction on PUCCH multiplexing in 38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1804452 | Draft CR on UL data transmission procedure | Huawei, HiSilicon | imported from 3GU |
R1‑1804453 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel | Ericsson | imported from 3GU |
R1‑1804454 | Introduction of Enhancing CA Utilization into 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804455 | On NR-LTE coex design | Ericsson GmbH, Eurolab | imported from 3GU |
R1‑1804456 | Remaining details on PRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804457 | Remaining details on RACH procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804458 | Remaining open items on short PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804459 | Remaining open items on long PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180446 | - | - | - |
R1‑1804460 | Remaining open items on UCI multiplexing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804461 | Remaining open items on PUCCH resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804462 | Considerations on NOMA transmitter | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804463 | Receiver considerations for UL NOMA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804464 | Procedures to be considered for NOMA operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804465 | Considerations on NOMA evaluation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804466 | Consideration on NOMA study | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804467 | TDD and FDD for NTN Applications | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1804468 | Initial link level simulation results for NOCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804469 | Remaining issues on PTRS | Mitsubishi Electric RCE | imported from 3GU |
R1‑180447 | - | - | - |
R1‑1804470 | Fast Fading Model of GEO S-Band Satellite | Dish Network | imported from 3GU |
R1‑1804471 | Re-Sync Signal Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑1804472 | Sub-PRB Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑1804473 | Work plan for Integrated Access and Backhaul Study Item | Samsung, Qualcomm, AT&T, KDDI | imported from 3GU |
R1‑1804474 | EDT Design Consideration | Sierra Wireless, S.A. | imported from 3GU |
R1‑1804475 | WUS Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R1‑1804476 | TR 38.874, Version 0.1.1 | Samsung, Qualcomm, AT&T, KDDI | imported from 3GU |
R1‑1804477 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE to 36.213 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804478 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE to 36.213 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804479 | Path loss model for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180448 | - | - | - |
R1‑1804480 | Fast fading characteristics for NTN | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804481 | Discussion on partial overlap between HARQ-ACK and SR | Panasonic Corporation | imported from 3GU |
R1‑1804482 | Discussion on partial overlap between PUCCH and PUSCH | Panasonic Corporation | imported from 3GU |
R1‑1804483 | Discussion on remaining issues on PUCCH resource allocation | Panasonic Corporation | imported from 3GU |
R1‑1804484 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804485 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804486 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s10-s13 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804487 | Coding schemes for NOMA in mMTC | Google Inc. | imported from 3GU |
R1‑1804488 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s14-xx | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804489 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑180449 | - | - | - |
R1‑1804490 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804491 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s10-s13 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804492 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s14-xx | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1804493 | Remaining issues for UCI repetition | ETRI | imported from 3GU |
R1‑1804494 | Corrections on beam failure recovery | ETRI | imported from 3GU |
R1‑1804495 | Considerations on NR impacts for Non-Terrestrial Networks | ETRI | imported from 3GU |
R1‑1804496 | Introduction of Downlink 1024QAM into 36.201 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804497 | Discussion on compact DCI format for NR URLLC | Panasonic Corporation | imported from 3GU |
R1‑1804498 | On UL SPS enhancements for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804499 | Remaining details on CSI Reporting | MTI | imported from 3GU |
R1‑180450 | - | - | - |
R1‑1804500 | Clarification on CRC attachment for DL-SCH and PCH transport channels | NEC Corporation | imported from 3GU |
R1‑1804501 | Symbol index definition for SSB time location | NEC Corporation | imported from 3GU |
R1‑1804502 | Remaining details on common PRB indexing and RRC parameters | NEC Corporation | imported from 3GU |
R1‑1804503 | RRC parameter alignment for EN-DC power control | NEC Corporation | imported from 3GU |
R1‑1804504 | Multiplexing of IAB links | ZTE, Sanechips | imported from 3GU |
R1‑1804505 | IAB enhancements overview | ZTE, Sanechips | imported from 3GU |
R1‑1804506 | [draft] Reply LS on SI reception in BWP | LG Electronics | imported from 3GU |
R1‑1804507 | TDD HARQ-ACK resource determination for SPT (36.213) | LG Electronics, Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804508 | Corrections related to DL data channel for sTTI operation | LG Electronics, Ericsson, Nokia, Nokia Shanghai Bell, Intel Corporation | imported from 3GU |
R1‑1804509 | Corrections related to UL data channel for sTTI operation | LG Electronics | imported from 3GU |
R1‑180451 | - | - | - |
R1‑1804510 | Discussion on carrier aggregation in sidelink mode 4 operation | LG Electronics | imported from 3GU |
R1‑1804511 | Discussion on synchronization for sidelink CA operation | LG Electronics | imported from 3GU |
R1‑1804512 | Discussion on 64QAM support | LG Electronics | imported from 3GU |
R1‑1804513 | Discussion on transparent transmit diversity | LG Electronics | imported from 3GU |
R1‑1804514 | Discussion on resource pool sharing between UEs using mode 3 and 4 | LG Electronics | imported from 3GU |
R1‑1804515 | Discussion on maximum time reduction between packet arrival and selected transmission resource | LG Electronics | imported from 3GU |
R1‑1804516 | Data transmission during random access procedure in MTC | LG Electronics | imported from 3GU |
R1‑1804517 | Discussion on wake up signal in MTC | LG Electronics | imported from 3GU |
R1‑1804518 | Discussion on early termination of uplink repetitions for MTC | LG Electronics | imported from 3GU |
R1‑1804519 | Discussion on wake up signal function in NB-IoT | LG Electronics | imported from 3GU |
R1‑180452 | - | - | - |
R1‑1804520 | Discussion on wake up signal configurations and procedures in NB-IoT | LG Electronics | imported from 3GU |
R1‑1804521 | Wake up signal design in NB-IoT | LG Electronics | imported from 3GU |
R1‑1804522 | Data transmission during random access procedure in NB-IoT | LG Electronics | imported from 3GU |
R1‑1804523 | Discussion on Scheduling request in NB-IoT | LG Electronics | imported from 3GU |
R1‑1804524 | SPS support in NB-IoT | LG Electronics | imported from 3GU |
R1‑1804525 | UL power control enhancement for NB-IoT small cell | LG Electronics | imported from 3GU |
R1‑1804526 | Remaining issues on reliability enhancements for NPRACH | LG Electronics | imported from 3GU |
R1‑1804527 | Resource configuration for NPRACH range enhancement | LG Electronics | imported from 3GU |
R1‑1804528 | Discussion on DL aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1804529 | Discussion on UL aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑180453 | - | - | - |
R1‑1804530 | Discussion on common aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1804531 | Discussion on blind/HARQ-less repetition for scheduled DL-SCH operation | LG Electronics | imported from 3GU |
R1‑1804532 | Discussion on repetition enhancements for UL SPS operation | LG Electronics | imported from 3GU |
R1‑1804533 | Remaining Details on Synchronization signal | LG Electronics | imported from 3GU |
R1‑1804534 | Remaining Details on PBCH design and contents | LG Electronics | imported from 3GU |
R1‑1804535 | RMSI delivery and CORESET configuration | LG Electronics | imported from 3GU |
R1‑1804536 | Other system information delivery | LG Electronics | imported from 3GU |
R1‑1804537 | Paging design in NR | LG Electronics | imported from 3GU |
R1‑1804538 | Discussion on PRACH preamble format details | LG Electronics | imported from 3GU |
R1‑1804539 | RACH Procedure | LG Electronics | imported from 3GU |
R1‑180454 | - | - | - |
R1‑1804540 | Remaining Details on L3 measurement and mobility management | LG Electronics | imported from 3GU |
R1‑1804541 | Discussion on Radio Link Monitoring in NR | LG Electronics | imported from 3GU |
R1‑1804542 | Corrections on non-codebook-based UL | LG Electronics | imported from 3GU |
R1‑1804543 | Remaining issues on CSI reporting | LG Electronics | imported from 3GU |
R1‑1804544 | Remaining issues on beam management | LG Electronics | imported from 3GU |
R1‑1804545 | Remaining issues on beam failure recovery | LG Electronics | imported from 3GU |
R1‑1804546 | Correction on multiplexing between CSI-RS and CORESET | LG Electronics | imported from 3GU |
R1‑1804547 | Text proposals on PT-RS | LG Electronics | imported from 3GU |
R1‑1804548 | Remaining issues on SRS | LG Electronics | imported from 3GU |
R1‑1804549 | Text proposals on TRS | LG Electronics | imported from 3GU |
R1‑180455 | - | - | - |
R1‑1804550 | Remaining issues on PDCCH structure | LG Electronics | imported from 3GU |
R1‑1804551 | Remaining issues on search space | LG Electronics | imported from 3GU |
R1‑1804552 | Remaining issues on group common PDCCH | LG Electronics | imported from 3GU |
R1‑1804553 | Remaining issues on DCI contents and formats | LG Electronics | imported from 3GU |
R1‑1804554 | Remaining issues on short-duration PUCCH | LG Electronics | imported from 3GU |
R1‑1804555 | Remaining issues on long-duration PUCCH | LG Electronics | imported from 3GU |
R1‑1804556 | Remaining issues on UCI multiplexing | LG Electronics | imported from 3GU |
R1‑1804557 | Remaining issues on PUCCH resource allocation | LG Electronics | imported from 3GU |
R1‑1804558 | Remaining issues on Resource allocation | LG Electronics | imported from 3GU |
R1‑1804559 | Remaining issues on DL/UL scheduling and HARQ | LG Electronics | imported from 3GU |
R1‑180456 | - | - | - |
R1‑1804560 | Remaining issues on UL data transmission procedure | LG Electronics | imported from 3GU |
R1‑1804561 | Remaining issues on bandwidth part operation | LG Electronics | imported from 3GU |
R1‑1804562 | Remaining issues on CA and HARQ-ACK codebook | LG Electronics | imported from 3GU |
R1‑1804563 | Remaining issues on rate matching | LG Electronics | imported from 3GU |
R1‑1804564 | Remaining issues on NR-LTE DC/Coexistence | LG Electronics | imported from 3GU |
R1‑1804565 | Remaining issues on power sharing between LTE and NR | LG Electronics | imported from 3GU |
R1‑1804566 | Remaining issues on non-CA aspect of UL power control | LG Electronics | imported from 3GU |
R1‑1804567 | Remaining issues on CA aspect of UL power control | LG Electronics | imported from 3GU |
R1‑1804568 | Views on UE feature (scheduling, BWP) | LG Electronics | imported from 3GU |
R1‑1804569 | Discussion on CQI and MCS table design for URLLC | LG Electronics | imported from 3GU |
R1‑180457 | - | - | - |
R1‑1804570 | Discussion on compact DCI format design | LG Electronics | imported from 3GU |
R1‑1804571 | Discussion on PDCCH repetition for URLLC | LG Electronics | imported from 3GU |
R1‑1804572 | Discussion on multiplexing UL transmission with different requirements | LG Electronics | imported from 3GU |
R1‑1804573 | Transmitter side signal processing schemes for NCMA | LG Electronics | imported from 3GU |
R1‑1804574 | Considerations on the receiver types and NoMA schemes | LG Electronics | imported from 3GU |
R1‑1804575 | Discussion on procedures related to NOMA | LG Electronics | imported from 3GU |
R1‑1804576 | Initial LLS evaluation for NCMA | LG Electronics | imported from 3GU |
R1‑1804577 | Discussion on evaluation scenarios for new V2X use cases | LG Electronics | imported from 3GU |
R1‑1804578 | Discussion on channel model for new V2X use cases | LG Electronics | imported from 3GU |
R1‑1804579 | Simulation methodology for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑180458 | - | - | - |
R1‑1804580 | Frame structure for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1804581 | Physical layer channel design for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1804582 | Physical layer procedures for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1804583 | Discussions on NR IAB support | LG Electronics | imported from 3GU |
R1‑1804584 | Discussions on evaluation methodology on NR IAB | LG Electronics | imported from 3GU |
R1‑1804585 | Initial evaluation results of eMBB for ITU IMT-2020 self-evaluation | LG Electronics | imported from 3GU |
R1‑1804586 | Calibration results for ITU IMT-2020 self-evaluation | LG Electronics | imported from 3GU |
R1‑1804587 | On blind/HARQ-less PDSCH repetition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804588 | On higher layer configured PCFICH for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804589 | Draft TR 37.885 v0.1.0 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | LG Electronics Inc. | imported from 3GU |
R1‑180459 | - | - | - |
R1‑1804590 | Remaining details on RACH timing for NR | ITL | imported from 3GU |
R1‑1804591 | Broadcast signals and synchronization for NR-U | ITL | imported from 3GU |
R1‑1804592 | Frame structure and numerology for NR-U | ITL | imported from 3GU |
R1‑1804593 | Remaining issues on downlink beam management | Sony | imported from 3GU |
R1‑1804594 | Remaining issues on SRS | Sony | imported from 3GU |
R1‑1804595 | Compact DCI for NR URLLC operation | Sony | imported from 3GU |
R1‑1804596 | Discussion on remaining issues of eV2X evaluation methodology | Sony | imported from 3GU |
R1‑1804597 | Considerations on physical layer procedures for NR unlicensed operations | Sony | imported from 3GU |
R1‑1804598 | Considerations on frame structure for NR unlicensed operations | Sony | imported from 3GU |
R1‑1804599 | PDCCH repetition for NR URLLC | Sony | imported from 3GU |
R1‑180460 | - | - | - |
R1‑1804600 | Considerations on UL pre-emption | Sony | imported from 3GU |
R1‑1804601 | Consideration on the transmitter side signal processing for NOMA | Sony | imported from 3GU |
R1‑1804602 | Considerations on eSS for efeMTC | Sony | imported from 3GU |
R1‑1804603 | On Early Data Transmission over Message 3 | Sony | imported from 3GU |
R1‑1804604 | Considerations of using WUS in efeMTC | Sony | imported from 3GU |
R1‑1804605 | Remaining issues in explicit uplink HARQ-ACK feedback for efeMTC | Sony | imported from 3GU |
R1‑1804606 | Remaining issues in sub-PRB transmission | Sony | imported from 3GU |
R1‑1804607 | Flexible PDSCH/PUSCH Resource Allocation for efeMTC | Sony | imported from 3GU |
R1‑1804608 | Use of option B CQI table by non-64QAM capable UEs | Sony | imported from 3GU |
R1‑1804609 | Discussion on UL transmission for aerial vehicle | Sony | imported from 3GU |
R1‑180461 | - | - | - |
R1‑1804610 | Considerations on NTN Relay use cases | Sony | imported from 3GU |
R1‑1804611 | NR enhancements to support integrated access and backhaul | Sony | imported from 3GU |
R1‑1804612 | DL Control Techniques for LTE URLLC | Fraunhofer HHI | imported from 3GU |
R1‑1804613 | Remaining issues for the Slot Format Indication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804614 | On the alignment of DCI format sizes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804615 | Remaining details of CQI and MCS for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804616 | On further study of compact DCI for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804617 | Discussion on reliability enhancement for PDCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804618 | On UL multiplexing between eMBB and URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804619 | Simultaneous configuration of grant and grant-free based UL transmission for URLLC UEs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180462 | - | - | - |
R1‑1804620 | Enhancements to support NR backhaul links | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804621 | IAB Deployment Scenarios and Evaluation Methodology | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804622 | Dynamic resource allocation between backhaul and access link | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804623 | RRM measurements in presence of IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804624 | IAB timing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804625 | IAB Topology Discussion | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804626 | On Cross-link Interference Management in IA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804627 | Introducing sTTI to V2X mode 3 | Panasonic | imported from 3GU |
R1‑1804628 | Discussion on resource pool sharing between UEs in mode 3 and UEs in mode 4 | Panasonic | imported from 3GU |
R1‑1804629 | On Mode-4 resource selection for PC5 CA | Ericsson | imported from 3GU |
R1‑180463 | - | - | - |
R1‑1804630 | On Synchronization Aspects for PC5 CA | Ericsson | imported from 3GU |
R1‑1804631 | Spectrum considerations for PC5 carrier aggregation | Ericsson | imported from 3GU |
R1‑1804632 | Supporting 64QAM on PC5 | Ericsson | imported from 3GU |
R1‑1804633 | Transmit diversity solutions for Rel-15 PSCCH and PSSCH transmissions | Ericsson | imported from 3GU |
R1‑1804634 | Evaluation of transmit diversity for V2X | Ericsson | imported from 3GU |
R1‑1804635 | DMRS design for two-port PSSCH transmission | Ericsson | imported from 3GU |
R1‑1804636 | Resource pool sharing between mode 3 and mode 4 UEs | Ericsson | imported from 3GU |
R1‑1804637 | Reducing time-to-transmit for V2X | Ericsson | imported from 3GU |
R1‑1804638 | Simulation scenarios and performance metrics for V2X | Ericsson | imported from 3GU |
R1‑1804639 | On channel models for eV2X evaluation | Ericsson | imported from 3GU |
R1‑180464 | - | - | - |
R1‑1804640 | Phase noise correction for non-terrestrial networks | Mitsubishi Electric RCE | imported from 3GU |
R1‑1804641 | On details of CQI and MCS tables for NR URLLC | Panasonic | imported from 3GU |
R1‑1804642 | Discussion on URLLC UL multiplexing | Panasonic | imported from 3GU |
R1‑1804643 | On support of faster inter-bandwidth part hopping for increased reliability | Panasonic | imported from 3GU |
R1‑1804644 | On PDCCH repetition for NR URLLC | Sequans Communications | imported from 3GU |
R1‑1804645 | Discussion on procedures related to NOMA | Google, Inc. | imported from 3GU |
R1‑1804646 | Discussion on procedures related to NOMA | Google, Inc. | imported from 3GU |
R1‑1804647 | DMRS for pi/2 BPSK with spectrum shaping | IITH, CEWIT, IITM, Tejas Networks, Reliance Jio | imported from 3GU |
R1‑1804648 | Remaining detail on the indication of cell-defining SS/PBCH block | Xiaomi Communications | imported from 3GU |
R1‑1804649 | Considerations on SS/PBCH blocks for NR unlicensed | Xiaomi Technology | imported from 3GU |
R1‑180465 | - | - | - |
R1‑1804650 | Further details of PDSCH time-domain resource allocation before RRC connection setup | AT&T | imported from 3GU |
R1‑1804651 | Further details on NR UE Feature List | AT&T | imported from 3GU |
R1‑1804652 | Remaining details of RACH Procedures | AT&T | imported from 3GU |
R1‑1804653 | Impact of beam failure and recovery on RLM procedures | AT&T | imported from 3GU |
R1‑1804654 | Remaining issue for MIMO Codeword mapping | AT&T | imported from 3GU |
R1‑1804655 | Remaining issue for CSI Reporting | AT&T | imported from 3GU |
R1‑1804656 | DCI size reduction for eMBB | AT&T | imported from 3GU |
R1‑1804657 | Remianing issues of multi-slot PUCCH | AT&T | imported from 3GU |
R1‑1804658 | CQI/MCS table design for URLLC | AT&T | imported from 3GU |
R1‑1804659 | Compact DCI and DM-RS design for URLLC | AT&T | imported from 3GU |
R1‑180466 | - | - | - |
R1‑1804660 | On PDCCH repetition for URLLC | AT&T | imported from 3GU |
R1‑1804661 | Simulation assumptions, scenarios and channel model for IAB | AT&T | imported from 3GU |
R1‑1804662 | Overview of Physical layer enhancements for IAB | AT&T | imported from 3GU |
R1‑1804663 | System level simulation results of IAB | AT&T | imported from 3GU |
R1‑1804664 | Simulation assumptions and scenarios for NR Unlicensed | AT&T | imported from 3GU |
R1‑1804665 | Closed loop LBT for Licensed Assisted NR | AT&T | imported from 3GU |
R1‑1804666 | Physical layer enhancements for NR Unlicensed | AT&T | imported from 3GU |
R1‑1804667 | On Transnmitter side processing for NOMA | AT&T | imported from 3GU |
R1‑1804668 | Low complexity Receiver design for NOMA | AT&T | imported from 3GU |
R1‑1804669 | Link level evaluaiton of NOMA schemes | AT&T | imported from 3GU |
R1‑180467 | - | - | - |
R1‑1804670 | Views On NOMA procedures | AT&T | imported from 3GU |
R1‑1804671 | Evaluation scenario and simulation assumptions | AT&T | imported from 3GU |
R1‑1804672 | Channel model for V2X | AT&T | imported from 3GU |
R1‑1804673 | Integrated access and sidelink: A unified concept for V2X | AT&T | imported from 3GU |
R1‑1804674 | Remaining issues on dynamic BWP switching | InterDigital, Inc. | imported from 3GU |
R1‑1804675 | Timing and Asynchronous Transmissions with Power Control for NR DC | InterDigital, Inc. | imported from 3GU |
R1‑1804676 | Power Control for NR DC | InterDigital, Inc. | imported from 3GU |
R1‑1804677 | Transmission of UCI with different reliability requirements | InterDigital, Inc. | imported from 3GU |
R1‑1804678 | Power Control for Transmissions with Different Service Requirements | InterDigital, Inc. | imported from 3GU |
R1‑1804679 | Open Issues on Mode 3 and Mode 4 Pool Sharing | InterDigital, Inc. | imported from 3GU |
R1‑180468 | - | - | - |
R1‑1804680 | BWP operation in unlicensed spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1804681 | Discussion on L1 data rate | Intel Corporation | imported from 3GU |
R1‑1804682 | DRAFT Reply LS on formula or table for L1 data rate | Intel Corporation | imported from 3GU |
R1‑1804683 | RE mapping of sPDCCH | Intel Corporation, Ericsson, Nokia, Qualcomm | imported from 3GU |
R1‑1804684 | On TBS selection for LTE | Intel Corporation | imported from 3GU |
R1‑1804685 | Corrections to 1024QAM support in LTE | Intel Corporation | imported from 3GU |
R1‑1804686 | Remaining physical layer aspects of sidelink carrier aggregation for mode-4 LTE V2V communication | Intel Corporation | imported from 3GU |
R1‑1804687 | Remaining synchronization details for LTE V2V sidelink carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1804688 | On demodulation enhancements for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑1804689 | On support of transmit diversity schemes for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑180469 | - | - | - |
R1‑1804690 | Sidelink resource pool sharing for eNB-controlled and UE-autonomous V2V transmission modes | Intel Corporation | imported from 3GU |
R1‑1804691 | Resource selection latency reduction for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑1804692 | System acquisition time reduction for efeMTC | Intel Corporation | imported from 3GU |
R1‑1804693 | Early data transmission for efeMTC | Intel Corporation | imported from 3GU |
R1‑1804694 | Power saving signal for efeMTC | Intel Corporation | imported from 3GU |
R1‑1804695 | HARQ-ACK feedback for efeMTC UL transmission | Intel Corporation | imported from 3GU |
R1‑1804696 | Design of sub-PRB PUSCH for efeMTC | Intel Corporation | imported from 3GU |
R1‑1804697 | The function scope of wake-up signal for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1804698 | Configurations of wake-up signal for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1804699 | Early data transmission for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑180470 | - | - | - |
R1‑1804700 | Scheduling request for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1804701 | Repetitions for DL operation | Intel Corporation | imported from 3GU |
R1‑1804702 | On UL power control enhancements for Aerial Vehicles | Intel Corporation | imported from 3GU |
R1‑1804703 | Remaining details of SS/PBCH block | Intel Corporation | imported from 3GU |
R1‑1804704 | Remaining details of NR-PBCH | Intel Corporation | imported from 3GU |
R1‑1804705 | Remaining details of RMSI | Intel Corporation | imported from 3GU |
R1‑1804706 | NR PRACH formats | Intel Corporation | imported from 3GU |
R1‑1804707 | NR RACH procedures | Intel Corporation | imported from 3GU |
R1‑1804708 | Remaining details of RRM measurements | Intel Corporation | imported from 3GU |
R1‑1804709 | Remaining details of RLM | Intel Corporation | imported from 3GU |
R1‑180471 | - | - | - |
R1‑1804710 | On Codebook based transmission for UL | Intel Corporation | imported from 3GU |
R1‑1804711 | On non-codebook based transmission for UL | Intel Corporation | imported from 3GU |
R1‑1804712 | Remaining issues on interference measurement for CSI | Intel Corporation | imported from 3GU |
R1‑1804713 | Remaining issues on CSI reporting | Intel Corporation | imported from 3GU |
R1‑1804714 | Remaining Issues on beam management | Intel Corporation | imported from 3GU |
R1‑1804715 | Remaining Issues on beam failure recovery | Intel Corporation | imported from 3GU |
R1‑1804716 | Corrections to CQI definition in NR | Intel Corporation | imported from 3GU |
R1‑1804717 | Spatial QCL considerations for multiplexing of physical channels and RS | Intel Corporation | imported from 3GU |
R1‑1804718 | On UE capability signalling for Type II CSI | Intel Corporation | imported from 3GU |
R1‑1804719 | Remaining issues on CSI-RS | Intel Corporation | imported from 3GU |
R1‑180472 | - | - | - |
R1‑1804720 | Remaining issues on DM-RS | Intel Corporation | imported from 3GU |
R1‑1804721 | Remaining issues On PT-RS | Intel Corporation | imported from 3GU |
R1‑1804722 | Remaining issues on SRS | Intel Corporation | imported from 3GU |
R1‑1804723 | Remaining Issues On TRS | Intel Corporation | imported from 3GU |
R1‑1804724 | Corrections to QCL for NR | Intel Corporation | imported from 3GU |
R1‑1804725 | NR PDCCH search spaces: BDs and channel estimation requirements | Intel Corporation | imported from 3GU |
R1‑1804726 | GC PDCCH: Some remaining details | Intel Corporation | imported from 3GU |
R1‑1804727 | Further considerations on DCI sizes | Intel Corporation | imported from 3GU |
R1‑1804728 | Handling collision between HARQ-ACK/SR and CSI | Intel Corporation | imported from 3GU |
R1‑1804729 | PUSCH-PUCCH and PUCCH-PUCCH collision handling | Intel Corporation | imported from 3GU |
R1‑180473 | - | - | - |
R1‑1804730 | UCI on PUSCH | Intel Corporation | imported from 3GU |
R1‑1804731 | Resource allocation before RRC setup | Intel Corporation | imported from 3GU |
R1‑1804732 | On peak rates and remaining details on DL/UL RA | Intel Corporation | imported from 3GU |
R1‑1804733 | Some remaining details on DL/UL scheduling and HARQ management | Intel Corporation | imported from 3GU |
R1‑1804734 | Remaining issues of UL data transmission procedures | Intel Corporation | imported from 3GU |
R1‑1804735 | Further discussion UCI mapping for carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1804736 | On Power Control framework | Intel Corporation | imported from 3GU |
R1‑1804737 | Power headroom report for NR carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1804738 | On NR UE feature list | Intel Corporation | imported from 3GU |
R1‑1804739 | CQI and MCS tables for NR URLLC | Intel Corporation | imported from 3GU |
R1‑180474 | - | - | - |
R1‑1804740 | On compact DCI format for NR URLLC | Intel Corporation | imported from 3GU |
R1‑1804741 | On NR PDCCH repetitions for URLLC | Intel Corporation | imported from 3GU |
R1‑1804742 | Handling UL transmissions with different reliability requirements | Intel Corporation | imported from 3GU |
R1‑1804743 | NOMA transmission scheme: LCRS | Intel Corporation | imported from 3GU |
R1‑1804744 | Receiver structure for NOMA | Intel Corporation | imported from 3GU |
R1‑1804745 | NOMA related procedure | Intel Corporation | imported from 3GU |
R1‑1804746 | Initial LLS results and SLS evaluation assumptions | Intel Corporation | imported from 3GU |
R1‑1804747 | On scenarios, traffic models and performance metrics for eV2X evaluations | Intel Corporation | imported from 3GU |
R1‑1804748 | On channel models for eV2X evaluation methodology | Intel Corporation | imported from 3GU |
R1‑1804749 | On the simulation methodology for NR unlicensed | Intel Corporation | imported from 3GU |
R1‑180475 | - | - | - |
R1‑1804750 | On the flexibility of NR to operate in unlicensed spectrum | Intel Corporation | imported from 3GU |
R1‑1804751 | Design consideration for NR unlicensed physical layer channels | Intel Corporation | imported from 3GU |
R1‑1804752 | Enhancements to NR to operate in unlicensed spectrum | Intel Corporation | imported from 3GU |
R1‑1804753 | Consideration for NR unlicensed channel access mechanism | Intel Corporation | imported from 3GU |
R1‑1804754 | Initial thoughts foron technology neutral design for greenfield | Intel Corporation | imported from 3GU |
R1‑1804755 | RAN1 related issues in IAB | Intel Corporation | imported from 3GU |
R1‑1804756 | Evaluation methodology for IAB | Intel Corporation | imported from 3GU |
R1‑1804757 | On Simulation Assumptions, Features and Parameters for IMT-2020 self-evaluation | Intel Corporation | imported from 3GU |
R1‑1804758 | On the IMT-2020 Self-Evaluation Performance Metrics and Initial Results | Intel Corporation | imported from 3GU |
R1‑1804759 | Remaining details on PDCCH structure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180476 | - | - | - |
R1‑1804760 | On NR operation under PDCCH channel estimation and BD limits | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804761 | Remaining details on search space | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804762 | On remaining details of BWPs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804763 | Remaining aspects of NR CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804764 | Remaining details on rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1804765 | Precoder Update for SPS UL | Ericsson Inc. | imported from 3GU |
R1‑1804766 | Frame Structure Design for NR-U | Charter Communications | imported from 3GU |
R1‑1804767 | Design considerations for standalone NR-U | Charter Communications | imported from 3GU |
R1‑1804768 | NR Unlicensed physical channel design considerations | Apple Inc. | imported from 3GU |
R1‑1804769 | NR Unlicensed considerations | Apple Inc. | imported from 3GU |
R1‑180477 | - | - | - |
R1‑1804770 | Discussion on beam measurement and reporting | Apple Inc. | imported from 3GU |
R1‑1804771 | Discussion on CBG based retransmissions | Apple Inc. | imported from 3GU |
R1‑1804772 | Discussion on handling of UL multiplexing of transmissions with different reliability requirement | Apple Inc. | imported from 3GU |
R1‑1804773 | Potential enhancements for NR UE power saving | Apple Inc. | imported from 3GU |
R1‑1804774 | Remaining details on synchronization signal design | Qualcomm Incorporated | imported from 3GU |
R1‑1804775 | Remaining details on NR-PBCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804776 | Remaining system information delivery consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1804777 | Paging design consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1804778 | Remaining details on PRACH formats | Qualcomm Incorporated | imported from 3GU |
R1‑1804779 | Remaining details on RACH procedure | Qualcomm Incorporated | imported from 3GU |
R1‑180478 | - | - | - |
R1‑1804780 | Remaining details on measurement for mobility management | Qualcomm Incorporated | imported from 3GU |
R1‑1804781 | Radio link monitoring consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1804782 | Remaining details on Timing advance granularity and adjustment consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1804783 | Maintenance for codebook based UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1804784 | Maintenance for non-codebook based UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1804785 | Maintenance for CSI measurement | Qualcomm Incorporated | imported from 3GU |
R1‑1804786 | Maintenance for CSI reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1804787 | Beam management for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1804788 | Beam recovery procedures | Qualcomm Incorporated | imported from 3GU |
R1‑1804789 | Details on simultaneous reception of PHY channels and RS in FR2 | Qualcomm Incorporated | imported from 3GU |
R1‑180479 | - | - | - |
R1‑1804790 | Maintenance for Multiplexing of RS | Qualcomm Incorporated | imported from 3GU |
R1‑1804791 | Maintenance for on CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑1804792 | Maintenance for DMRS | Qualcomm Incorporated | imported from 3GU |
R1‑1804793 | PTRS considerations | Qualcomm Incorporated | imported from 3GU |
R1‑1804794 | Maintenance for SRS | Qualcomm Incorporated | imported from 3GU |
R1‑1804795 | Remaining issues on TRS | Qualcomm Incorporated | imported from 3GU |
R1‑1804796 | Remaining details on QCL | Qualcomm Incorporated | imported from 3GU |
R1‑1804797 | Remaining issues on PDCCH structure | Qualcomm Incorporated | imported from 3GU |
R1‑1804798 | Remaining issues on control resource set and search space | Qualcomm Incorporated | imported from 3GU |
R1‑1804799 | Remaining issues for slot format indication | Qualcomm Incorporated | imported from 3GU |
R1‑180480 | - | - | - |
R1‑1804800 | Discussion on DCI related issues | Qualcomm Incorporated | imported from 3GU |
R1‑1804801 | TP for 38.213 on SFI | Qualcomm Incorporated | imported from 3GU |
R1‑1804802 | Remaining issues for short PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804803 | Remaining issues for long PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804804 | Remaining issues for multiplexing UCI on PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804805 | Remaining issues for resource allocation for PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804806 | Remaining Issues on DL/UL resource allocation | Qualcomm Incorporated | imported from 3GU |
R1‑1804807 | Remaining Issues on DL/UL Scheduling, Processing Time and HARQ management | Qualcomm Incorporated | imported from 3GU |
R1‑1804808 | Remaining issues on downlink preemption indication | Qualcomm Incorporated | imported from 3GU |
R1‑1804809 | Remaining issues on BWP | Qualcomm Incorporated | imported from 3GU |
R1‑180481 | - | - | - |
R1‑1804810 | Remaining issues on CA | Qualcomm Incorporated | imported from 3GU |
R1‑1804811 | Remaining aspects of NR-LTE coexistence | Qualcomm Incorporated | imported from 3GU |
R1‑1804812 | Remaining issues on power control for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1804813 | Remaining Issues on power control for NR CA | Qualcomm Incorporated | imported from 3GU |
R1‑1804814 | NR Features and Capabilities | Qualcomm Incorporated | imported from 3GU |
R1‑1804815 | Signaling aspects for UE capabilities | Qualcomm Incorporated | imported from 3GU |
R1‑1804816 | Considerations for UE feature support of 60kHz | Qualcomm Incorporated | imported from 3GU |
R1‑1804817 | Considerations for CQI and MCS for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1804818 | Considerations on new DCI format | Qualcomm Incorporated | imported from 3GU |
R1‑1804819 | Considerations on PDCCH repetition | Qualcomm Incorporated | imported from 3GU |
R1‑180482 | - | - | - |
R1‑1804820 | eMBB and URLLC dynamic multiplexing and preemption indication on the uplink | Qualcomm Incorporated | imported from 3GU |
R1‑1804821 | Impact of UE processing timeline on the URLLC performance | Qualcomm Incorporated | imported from 3GU |
R1‑1804822 | On NTN initial access | Qualcomm Incorporated | imported from 3GU |
R1‑1804823 | Transmitter side signaling processing schemes for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1804824 | Receivers for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1804825 | Procedures related to NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1804826 | Link and system level evaluation for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1804827 | Evaluation scenarios for NR V2X use cases | Qualcomm Incorporated | imported from 3GU |
R1‑1804828 | Simulation methodology for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1804829 | Frame structure for NR-U operation | Qualcomm Incorporated | imported from 3GU |
R1‑180483 | - | - | - |
R1‑1804830 | Potential phy channel design for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1804831 | Potential procedure design for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1804832 | NR-U AUL | Qualcomm Incorporated | imported from 3GU |
R1‑1804833 | Waveform options for 60GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑1804834 | Waveform under PSD limitation for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1804835 | Enhancements to support NR backhaul links | Qualcomm Incorporated | imported from 3GU |
R1‑1804836 | Evaluation methodology for NR IAB | Qualcomm Incorporated | imported from 3GU |
R1‑1804837 | Waveform under PSD limitation for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1804838 | Enhancements to support NR backhaul links | Qualcomm Incorporated | imported from 3GU |
R1‑1804839 | Evaluation methodology for NR IAB | Qualcomm Incorporated | imported from 3GU |
R1‑180484 | - | - | - |
R1‑1804840 | Remaining Details for Physical Broadcast Channel | InterDigital, Inc. | imported from 3GU |
R1‑1804841 | Remaining Details for Paging Channel | InterDigital, Inc. | imported from 3GU |
R1‑1804842 | Remaining Details for Physical Random Access Channel | InterDigital, Inc. | imported from 3GU |
R1‑1804843 | On Operation of Non-CB based UL Transmission | InterDigital, Inc. | imported from 3GU |
R1‑1804844 | Remaining issues on CSI reporting | InterDigital, Inc. | imported from 3GU |
R1‑1804845 | Remaining issues on beam management | InterDigital, Inc. | imported from 3GU |
R1‑1804846 | Remaining issues on beam failure recovery | InterDigital, Inc. | imported from 3GU |
R1‑1804847 | Remaining issues on PT-RS | InterDigital, Inc. | imported from 3GU |
R1‑1804848 | Remaining issues of search spaces | InterDigital, Inc. | imported from 3GU |
R1‑1804849 | Remaining Issues on URLLC Data Channel Coding | InterDigital, Inc. | imported from 3GU |
R1‑180485 | - | - | - |
R1‑1804850 | On Pathloss Correction during Beam Switch | InterDigital, Inc. | imported from 3GU |
R1‑1804851 | Remaining Details of CQI and MCS Tables for URLLC | InterDigital, Inc. | imported from 3GU |
R1‑1804852 | Evaluation of Compact DCI for URLLC | InterDigital, Inc. | imported from 3GU |
R1‑1804853 | Evaluation of PDCCH Repetition for URLLC | InterDigital, Inc. | imported from 3GU |
R1‑1804854 | On Dynamic Resource Sharing between eMBB and URLLC in UL | InterDigital, Inc. | imported from 3GU |
R1‑1804855 | Modeling of Tropospheric Scintillation Effects in NTN Channel Model | InterDigital, Inc. | imported from 3GU |
R1‑1804856 | Simulation Results for PTRS Performance in Non-Terrestrial Networks | InterDigital, Inc. | imported from 3GU |
R1‑1804857 | Deactivating HARQ for Non-Terrestrial Networks | InterDigital, Inc. | imported from 3GU |
R1‑1804858 | Considerations on Timing Advance for NTN | InterDigital, Inc. | imported from 3GU |
R1‑1804859 | Implementation Aspects of Low Code Rate NOMA Schemes | InterDigital, Inc. | imported from 3GU |
R1‑180486 | - | - | - |
R1‑1804860 | DMRS CHEST Error Model for NOMA Evaluation | InterDigital, Inc. | imported from 3GU |
R1‑1804861 | On Procedures Related to Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑1804862 | IDMA Link Level Simulation Results | InterDigital, Inc. | imported from 3GU |
R1‑1804863 | Discussion on System Level NOMA Evaluation | InterDigital, Inc. | imported from 3GU |
R1‑1804864 | On Operations for Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑1804865 | On V2X Evaluation Methodology | InterDigital, Inc. | imported from 3GU |
R1‑1804866 | V2X Sidelink Channel Model with Vehicle Blockage | InterDigital, Inc. | imported from 3GU |
R1‑1804867 | Consideration of NR-U Simulation Evaluation on 60 GHz Channels | InterDigital, Inc. | imported from 3GU |
R1‑1804868 | On Frame Structure for NR-U Operation | InterDigital, Inc. | imported from 3GU |
R1‑1804869 | On UL Physical Layer Channel Design for NR-U | InterDigital, Inc. | imported from 3GU |
R1‑180487 | - | - | - |
R1‑1804870 | On Physical Layer Procedures for NR-U | InterDigital, Inc. | imported from 3GU |
R1‑1804871 | Correction on shortened processing time for 1ms TTI | Sharp | imported from 3GU |
R1‑1804872 | Early data transmission for MTC | Sharp | imported from 3GU |
R1‑1804873 | Remaining issues for PUSCH sub-PRB allocation | Sharp | imported from 3GU |
R1‑1804874 | On more flexible PDSCH/PUSCH resource allocation | Sharp | imported from 3GU |
R1‑1804875 | Data transmission during random access procedure for NB-IoT | Sharp | imported from 3GU |
R1‑1804876 | Uplink aspects of TDD NB-IoT | Sharp | imported from 3GU |
R1‑1804877 | Remaining issues on RACH procedure | Sharp | imported from 3GU |
R1‑1804878 | Open issues on codeword mapping | Sharp | imported from 3GU |
R1‑1804879 | Clarification on aperiodic CSI reporting in CA case | Sharp | imported from 3GU |
R1‑180488 | - | - | - |
R1‑1804880 | Discussions on SRS resource transmission for BWP switch | Sharp | imported from 3GU |
R1‑1804881 | Remaining issues on slot format for NR | Sharp | imported from 3GU |
R1‑1804882 | Discussions on RB selection for PUCCH resource | Sharp | imported from 3GU |
R1‑1804883 | UCI multiplexing with NUCI based PUCCH resource set selection | Sharp | imported from 3GU |
R1‑1804884 | On Potential Waveform Solutions for NR-U | InterDigital, Inc. | imported from 3GU |
R1‑1804885 | On LBT for Beam-Based Transmission for NR-U | InterDigital, Inc. | imported from 3GU |
R1‑1804886 | On Synchronization Signal and PBCH for NR Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1804887 | On Random Access for NR Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1804888 | On Paging for NR Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1804889 | Consideration on TBS determination | ZTE, Sanechips | imported from 3GU |
R1‑180489 | - | - | - |
R1‑1804890 | TDD NB-IoT coexistence with NR | SoftBank Corp. | imported from 3GU |
R1‑1804891 | Ordering of P-CSI plus SR in eCA | Qualcomm Incorporated | imported from 3GU |
R1‑1804892 | On support of advanced CSI | Qualcomm Incorporated | imported from 3GU |
R1‑1804893 | Clarification on CSS monitoring for 5MHz operation | Qualcomm Incorporated | imported from 3GU |
R1‑1804894 | Correction to timing advance | Qualcomm Incorporated | imported from 3GU |
R1‑1804895 | Collision with NPRACH in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑1804896 | On NPRS performance | Qualcomm Incorporated | imported from 3GU |
R1‑1804897 | Considerations for DL quality reporting in msg3 for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R1‑1804898 | On NRS presence in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑1804899 | UL Compensation gaps for multiple HARQ | Qualcomm Incorporated | imported from 3GU |
R1‑180490 | - | - | - |
R1‑1804900 | Issues for SRS Carrier switching | Qualcomm Incorporated | imported from 3GU |
R1‑1804901 | Aspects related to interaction between different TTI lengths | Qualcomm Incorporated | imported from 3GU |
R1‑1804902 | Aspects related to DL control channel | Qualcomm Incorporated | imported from 3GU |
R1‑1804903 | Aspects related to UL control channel | Qualcomm Incorporated | imported from 3GU |
R1‑1804904 | Aspects related to DL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑1804905 | Aspects related to UL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑1804906 | UE Categories for 1024QAM | Qualcomm Incorporated | imported from 3GU |
R1‑1804907 | Mode 4 support with V2X PC5 Carrier Aggregation | Qualcomm Incorporated | imported from 3GU |
R1‑1804908 | Synchronization for V2X PC5 Carrier Aggregation | Qualcomm Incorporated | imported from 3GU |
R1‑1804909 | Transmit Diversity for V2X Phase 2 | Qualcomm Incorporated | imported from 3GU |
R1‑180491 | - | - | - |
R1‑1804910 | Resource pool sharing between Mode 3 and Mode 4 | Qualcomm Incorporated | imported from 3GU |
R1‑1804911 | Reduction of time between packet arrival and transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1804912 | Reduced system acquisition time | Qualcomm Incorporated | imported from 3GU |
R1‑1804913 | Physical layer aspects of early data transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1804914 | Efficient monitoring of DL control channels | Qualcomm Incorporated | imported from 3GU |
R1‑1804915 | Uplink HARQ-ACK feedback | Qualcomm Incorporated | imported from 3GU |
R1‑1804916 | Sub-PRB allocation for eFeMTC | Qualcomm Incorporated | imported from 3GU |
R1‑1804917 | Flexible allocation for PDSCH and PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804918 | Wake-up signal functions | Qualcomm Incorporated | imported from 3GU |
R1‑1804919 | Wake-up signal configurations and procedures | Qualcomm Incorporated | imported from 3GU |
R1‑180492 | - | - | - |
R1‑1804920 | Wake-up signal design | Qualcomm Incorporated | imported from 3GU |
R1‑1804921 | Physical layer aspects of data transmission during random access procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1804922 | Physical layer scheduling request | Qualcomm Incorporated | imported from 3GU |
R1‑1804923 | Support of SPS | Qualcomm Incorporated | imported from 3GU |
R1‑1804924 | Enhancements to cell search | Qualcomm Incorporated | imported from 3GU |
R1‑1804925 | Enhancements to system information acquisiton | Qualcomm Incorporated | imported from 3GU |
R1‑1804926 | Improvement of PHY measurements | Qualcomm Incorporated | imported from 3GU |
R1‑1804927 | NPRACH support for large cell access | Qualcomm Incorporated | imported from 3GU |
R1‑1804928 | NPRACH Reliability Enhancement | Qualcomm Incorporated | imported from 3GU |
R1‑1804929 | Downlink aspects of TDD | Qualcomm Incorporated | imported from 3GU |
R1‑180493 | - | - | - |
R1‑1804930 | Uplink aspects of TDD | Qualcomm Incorporated | imported from 3GU |
R1‑1804931 | General considerations on TDD design | Qualcomm Incorporated | imported from 3GU |
R1‑1804932 | Coexistence with NR | Qualcomm Incorporated | imported from 3GU |
R1‑1804933 | Downlink Enhancements for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1804934 | Uplink Enhancements for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1804935 | PCFICH Enhancements for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1804936 | UL power control enhancements for aerial vehicles | Qualcomm Incorporated | imported from 3GU |
R1‑1804937 | SRS antenna switching for 1T4R and 2T4R | Qualcomm Incorporated | imported from 3GU |
R1‑1804938 | Discussion on modulation enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1804939 | Control plane latency reduction | Qualcomm Incorporated | imported from 3GU |
R1‑180494 | - | - | - |
R1‑1804940 | Consideration of compact DCI design for URLLC | China Unicom | imported from 3GU |
R1‑1804941 | Tx side processing for UL NOMA | NICT | imported from 3GU |
R1‑1804942 | Receivers for UL NOMA | NICT | imported from 3GU |
R1‑1804943 | Discussion on compact DCI for NR URLLC | Beijing Xiaomi Mobile Software | imported from 3GU |
R1‑1804944 | Discussion on PDCCH repetition for NR URLLC | Beijing Xiaomi Mobile Software | imported from 3GU |
R1‑1804945 | On UL multiplexing of transmission with different reliability requirements | Beijing Xiaomi Mobile Software | imported from 3GU |
R1‑1804946 | Discussions on DMRS | Mitsubishi Electric Co. | imported from 3GU |
R1‑1804947 | Discussions on UL multiplexing | Mitsubishi Electric Co. | imported from 3GU |
R1‑1804948 | Discussions on multiplexing of different types of RSs | Mitsubishi Electric Co. | imported from 3GU |
R1‑1804949 | What is "initial access" in RAN1? | Panasonic | imported from 3GU |
R1‑180495 | - | - | - |
R1‑1804950 | Collision between SSB and PDCCH | Panasonic | imported from 3GU |
R1‑1804951 | Channel estimation complexity and search space | Panasonic | imported from 3GU |
R1‑1804952 | Inconsistent PDCCH detection | Panasonic | imported from 3GU |
R1‑1804953 | Discussion and draft LS response to SI reception in BWP | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804954 | Remaining details on random access procedure | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804955 | Remaining details on radio link monitoring | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804956 | Remaining details on PUCCH resource allocation | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804957 | Multiplexing of URLLC and eMBB uplink channels | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804958 | PDSCH aspects of LTE-URLLC | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804959 | Remaining Details on non-CA NR UL power control | Motorola Mobility, Lenovo | imported from 3GU |
R1‑180496 | - | - | - |
R1‑1804960 | On CA-related NR UL power control | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1804961 | On DL 4-layer MIMO supporting | China Unicom | imported from 3GU |
R1‑1804962 | [Draft] Reply LS on SI Reception in BWP | MediaTek Inc. | imported from 3GU |
R1‑1804963 | Disscussion on UL multiplexing of transmissions with different reliability requirements | China Unicom | imported from 3GU |
R1‑1804964 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1804965 | On DMRS groups in Rel-15 | Ericsson | imported from 3GU |
R1‑1804966 | Corrections for UL Antenna Port Identification | Ericsson | imported from 3GU |
R1‑1804967 | Remaining issues on CW mapping and data scrambling | Ericsson | imported from 3GU |
R1‑1804968 | Corrections for Codebook Based UL MIMO | Ericsson | imported from 3GU |
R1‑1804969 | Corrections for Non-Codebook Based UL MIMO | Ericsson | imported from 3GU |
R1‑180497 | - | - | - |
R1‑1804970 | Remaining issues on DL PRB bundling | Ericsson | imported from 3GU |
R1‑1804971 | UL precoder classification | Ericsson | imported from 3GU |
R1‑1804972 | Remaining issues on CSI measurement | Ericsson | imported from 3GU |
R1‑1804973 | Remaining issues on CSI reporting | Ericsson | imported from 3GU |
R1‑1804974 | Remaining details of beam management | Ericsson | imported from 3GU |
R1‑1804975 | Remaining issues on beam recovery | Ericsson | imported from 3GU |
R1‑1804976 | Multi-cell beam recovery | Ericsson | imported from 3GU |
R1‑1804977 | On simultaneous reception of physical and reference signals across CCs | Ericsson | imported from 3GU |
R1‑1804978 | Remaining issues on SP CSI reporting on PUSCH | Ericsson | imported from 3GU |
R1‑1804979 | Miscellaneous corrections and clarifications on CSI acquisition | Ericsson | imported from 3GU |
R1‑180498 | - | - | - |
R1‑1804980 | On OFDM symbol level PDSCH power boosting | Ericsson | imported from 3GU |
R1‑1804981 | Remaining issues on RS multiplexing | Ericsson | imported from 3GU |
R1‑1804982 | Remaining issues on CSI-RS | Ericsson | imported from 3GU |
R1‑1804983 | Remaining issues on DMRS | Ericsson | imported from 3GU |
R1‑1804984 | Remaining issues on PT-RS | Ericsson | imported from 3GU |
R1‑1804985 | Remaining issues on SRS | Ericsson | imported from 3GU |
R1‑1804986 | Remaining issues on TRS | Ericsson | imported from 3GU |
R1‑1804987 | Remaining issues on QCL | Ericsson | imported from 3GU |
R1‑1804988 | Analysis of periodic vs aperiodic TRS | Ericsson | imported from 3GU |
R1‑1804989 | Benefits of resource specific DMRS mapping | Ericsson | imported from 3GU |
R1‑180499 | - | - | - |
R1‑1804990 | Evaluations of TRS periodicity | Ericsson | imported from 3GU |
R1‑1804991 | Lossless compression of scheduling BW thresholds for PT-RS | Ericsson | imported from 3GU |
R1‑1804992 | On correlation of DMRS Gold sequences | Ericsson | imported from 3GU |
R1‑1804993 | On UE TX frequency accuracy with TRS based synchronization | Ericsson | imported from 3GU |
R1‑1804994 | TP for TS 38.212 related to aperiodic and semi-persistent TRS | Ericsson | imported from 3GU |
R1‑1804995 | TP for TS 38.214 related to DMRS sequence | Ericsson | imported from 3GU |
R1‑1804996 | Type 1 mapping of halp-pi BPSK DFTS DMRS | Ericsson | imported from 3GU |
R1‑1804997 | On a resource specific sequence mapping for CSI-RS | Ericsson | imported from 3GU |
R1‑1804998 | On correlation of CSI-RS Gold sequences | Ericsson | imported from 3GU |
R1‑1804999 | On additional periodicities for CSI-RS and SRS | Ericsson | imported from 3GU |
R1‑180500 | - | - | - |
R1‑1805000 | NR UE feature list for MIMO and RS | Ericsson | imported from 3GU |
R1‑1805001 | On RRC parameter alignment between 38.214 and 38.331 | Ericsson | imported from 3GU |
R1‑1805002 | Discussion on UE capability list | Ericsson | imported from 3GU |
R1‑1805003 | Signature design for NoMA | Ericsson | imported from 3GU |
R1‑1805004 | NoMA receiver design | Ericsson | imported from 3GU |
R1‑1805005 | Procedures related to NoMA | Ericsson | imported from 3GU |
R1‑1805006 | Evaluation methodology and metrics for NoMA | Ericsson | imported from 3GU |
R1‑1805007 | Observations on NOMA traffic models | Ericsson | imported from 3GU |
R1‑1805008 | NR-U evaluation methodology | Ericsson | imported from 3GU |
R1‑1805009 | On Frame Structure for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑180501 | - | - | - |
R1‑1805010 | Physical layer channel design for NR unlicensed operation | Ericsson | imported from 3GU |
R1‑1805011 | Physical layer procedures for NR unlicensed operation | Ericsson | imported from 3GU |
R1‑1805012 | On SRS design for NR unlicensed operation | Ericsson | imported from 3GU |
R1‑1805013 | On the Introduction of a Discovery Reference Signal | Ericsson | imported from 3GU |
R1‑1805014 | On NR operation in 60GHz unlicensed band | Ericsson | imported from 3GU |
R1‑1805015 | Numerology for NR operation in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1805016 | On Autonomous UL Transmissions for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑1805017 | On PRACH for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑1805018 | On interlace design for NR-U uplink | Ericsson | imported from 3GU |
R1‑1805019 | Discussion on UL power control enhancements for aerial vehicles | Ericsson | imported from 3GU |
R1‑180502 | - | - | - |
R1‑1805020 | Evaluation results on extended range of UE specific P0 parameter | Ericsson | imported from 3GU |
R1‑1805021 | On positioning for aerial vehicles | Ericsson | imported from 3GU |
R1‑1805022 | On carrier aggregation using mode 4 resource selection | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805023 | Transmission diversity solutions | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805024 | Resource pool sharing between Mode-3 UE and Mode-4 UE | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805025 | Reducing the maximum time between packet arrival and selected resource for data transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805026 | Views on UL HARQ-ACK feedback design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805027 | Views on PUSCH sub-PRB allocation for MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805028 | Views on SPS activation and deactivation mechanism | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805029 | Draft reply LS on Message 3 size for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑180503 | - | - | - |
R1‑1805030 | Discussion for NR Message 3 size | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805031 | Remaining issues on Synchronization signal | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805032 | Remaining issues on NR-PBCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805033 | Remaining issues on RMSI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805034 | Remaining issues on Paging design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805035 | Remaining issues on PRACH formats | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805036 | Remaining issues on RACH procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805037 | Remaining issues on Measurement for mobility management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805038 | Remaining issues on RLM for mobility management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805039 | Remaining details on non-codebook based UL transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑180504 | - | - | - |
R1‑1805040 | Remaining issues on CSI reporting | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805041 | Remining Issues on Beam Management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805042 | Remaining issues on beam recovery | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805043 | On Type II codebook enhancement | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805044 | Remaining details on CSI-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805045 | Remaining details on DM-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805046 | Remaining details on PTRS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805047 | Remaining details on TRS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805048 | Search space | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805049 | Remaining issues on group-common PDCCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑180505 | - | - | - |
R1‑1805050 | DCI contents and formats | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805051 | PUCCH structure in short-duration | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805052 | PUCCH structure in long-duration | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805053 | UCI multiplexing on PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805054 | Resource allocation for PUCCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805055 | Resource allocation and TBS determination | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805056 | PUSCH time-domain resource allocation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805057 | UL data transmission procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805058 | Other aspects on bandwidth Parts | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805059 | Remaining issues on HARQ-ACK codebook and CA | NTT DOCOMO, INC. | imported from 3GU |
R1‑180506 | - | - | - |
R1‑1805060 | Remaining issues on PHR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805061 | Views on NR UE features | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805062 | Necessity of compact DCI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805063 | Necessity of PDCCH repetition | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805064 | Handling UL multiplexing of transmissions with different reliability requirements | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805065 | Transmitter design for uplink NOMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805066 | Receiver candidate for uplink NOMA transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805067 | Initial views on procedures related to NOMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805068 | Discussion on comparison methodology and system-level evaluations for NOMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805069 | Evaluation assumption for V2X phase 3 | NTT DOCOMO, INC. | imported from 3GU |
R1‑180507 | - | - | - |
R1‑1805070 | Channel model for V2X phase 3 | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805071 | Simulation Methodology for NR-U operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805072 | Potential physical layer procedures for NR-U operation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805073 | Link to System Mapping for IMT-2020 Self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805074 | Evaluation results of rural-eMBB for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805075 | Evaluation results of dense urban-eMBB for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805076 | Evaluation results of Indoor Hotspot-eMBB for IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805077 | On channel models for eV2X | Cohere Technologies | imported from 3GU |
R1‑1805078 | NR-NTN: Link budget analysis | THALES | imported from 3GU |
R1‑1805079 | NR-NTN: Potential areas of impact, chapter structure | THALES | imported from 3GU |
R1‑180508 | - | - | - |
R1‑1805080 | DCI format 1_0 with X-RNTIs | Panasonic Corporation | imported from 3GU |
R1‑1805081 | Discussions on HARQ-ACK bundling and multiplexing | China Telecommunications | imported from 3GU |
R1‑1805082 | Multistage MMSE scheme for low complexity NOMA receivers | ESA, AIRBUS DS SLC | imported from 3GU |
R1‑1805083 | Ionospheric scintillations for NTN channel | ESA | imported from 3GU |
R1‑1805084 | Tropospheric scintillations for NTN channel | ESA | imported from 3GU |
R1‑1805085 | Physical-layer aspects related to IAB | Nanjing Ericsson Panda Com Ltd | imported from 3GU |
R1‑1805086 | IAB Simulation Evaluation Methodology and KPIs | Nanjing Ericsson Panda Com Ltd | imported from 3GU |
R1‑1805087 | Clarification for sPDSCH rate matching behavior with two SPDCCH PRB set | MediaTek Inc. | imported from 3GU |
R1‑1805088 | Clarification for assumption in SPT with CSS and USS overlap | MediaTek Inc. | imported from 3GU |
R1‑1805089 | NR-NTN: Impact of channel frequency selectivity on DM-RS distribution (frequency) | THALES | imported from 3GU |
R1‑180509 | - | - | - |
R1‑1805090 | Discussion on eV2X use cases | Ericsson LM | imported from 3GU |
R1‑1805091 | Remaining issues on synchronization for CA in V2X Phase 2 | ITL | imported from 3GU |
R1‑1805092 | Waveform considerations for NR-U in the 60GHz band | Mitsubishi Electric RCE | imported from 3GU |
R1‑1805093 | Discussion on network topology for sub-7GHz coexistence evaluations between NR-U and Wi-Fi | Broadcom, Cisco, HPE | imported from 3GU |
R1‑1805094 | NR-NTN: Impact of Doppler variation rate on DM-RS distribution (time) | THALES | imported from 3GU |
R1‑1805095 | NR-NTN: Impact on Initial TA during random access procedure | THALES | imported from 3GU |
R1‑1805096 | DCI format for URLLC | China Telecommunications | imported from 3GU |
R1‑1805097 | Preliminary evaluation of link level performance for LDPC coding | China Telecommunications | imported from 3GU |
R1‑1805098 | UL Multiplexing for Transmissions of different Reliabilities | TCL Communication | imported from 3GU |
R1‑1805099 | Draft LS Response to RAN2 on Beam- and Cell- Radio-Link-Monitoring | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180510 | - | - | - |
R1‑1805100 | Remaining Issue on DMRS Port Mapping and its Impact on CQI/MCS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805101 | Remaining issues on UL codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805102 | Remaining issues on non-codebook based UL-MIMO transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805103 | Remaining Details on the CSI Framework | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805104 | Remaining issues on beam management | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805105 | Remaining Details on Beam Recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805106 | Remaining Issue on Type II CSI Omission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805107 | On channels multiplexing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805108 | Remaining issues on CSI-RS design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805109 | Further comments on DM-RS for NR physical data channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180511 | - | - | - |
R1‑1805110 | Further comments on PT-RS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805111 | Remaining details on SRS design in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805112 | Remaining details of TRS design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805113 | Channel Access Procedure for NR on Unlicensed Band | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑1805114 | NR-NTN channel modeling - Flat fading criteria | THALES | imported from 3GU |
R1‑1805115 | NR-NTN Channel Modeling – Large scale parameters | THALES | imported from 3GU |
R1‑1805116 | NR-NTN Channel Modeling – Text proposal for the 6th clause of TR38.811 | THALES | imported from 3GU |
R1‑1805117 | Correction of number of UL HARQ processes for shorter TTI and shortened processing time (36.213) - TP#14 | Nokia, Nokia Shanghai Bell, Ericsson, Intel | imported from 3GU |
R1‑1805118 | HARQ ID definition to TDD UL index based PUSCH scheduling for SPT in 36.213 - TP#15 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑1805119 | Retaining UL index based scheduling flexibility for SPT without UpPTS PUSCH (36.213) - TP#16 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑180512 | - | - | - |
R1‑1805120 | Needed correction in 36.213 of applicability of TDD UL PUSCH timing for SPT - TP#17 | Nokia, Nokia Shanghai Bell, Qualcomm | imported from 3GU |
R1‑1805121 | Support for RRC configurable DM-RS CS for 1ms TTI UL SPS - TP#19 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑1805122 | Enabling transmit diversity fallback for DL TM 6 for shorter TTI (36.212, 36.213) - TP#20 | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics, Intel, Qualcomm | imported from 3GU |
R1‑1805123 | Enabling transmit diversity fallback for DL TM 8 for shorter TTI (36.212, 36.213) - TP#21 | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics | imported from 3GU |
R1‑1805124 | Enabling transmit diversity fallback for DL TM 9 and 10 for shorter TTI (36.212, 36.213) - TP#22 | Nokia, Nokia Shanghai Bell, LG Electronics | imported from 3GU |
R1‑1805125 | Changes to FS2 SRS triggering for shorter TTI (36.212, 36.213) - TP#23 | Nokia, Nokia Shanghai Bell, Ericsson, Huawei, LG Electronics | imported from 3GU |
R1‑1805126 | Corrections on DM-RS for slot PDSCH (36.211) - TP#24 | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics | imported from 3GU |
R1‑1805127 | Corrections and simplifications of K_PUSCH for FS2 slot-PUSCH in 36.213 - TP#25 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑1805128 | Correction in 36.213 to TDD UL index based slot PUSCH scheduling - TP#26 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805129 | EPDCCH monitoring restrictions for shorter TTI operation (36.213) - TP#45 | Nokia, Nokia Shanghai Bell, Huawei, LG Electronics, Mediatek, Intel | imported from 3GU |
R1‑180513 | - | - | - |
R1‑1805130 | NTN NR impacts due to phase noise | Fraunhofer IIS | imported from 3GU |
R1‑1805131 | Remaining Issues on Overlapping of HARQ-ACK and SR | III | imported from 3GU |
R1‑1805132 | TBS Determination for Early Data Transmission | III | imported from 3GU |
R1‑1805133 | Scheduling Aspects of TDD NB-IoT | III | imported from 3GU |
R1‑1805134 | Open issues related to Synchronisation Signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805135 | Remaining details related to SS/PBCH block | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805136 | Remaining issues on RMSI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805137 | On BWP for Other System Information Delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805138 | BWP determination for paging message delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805139 | Remaining issues on mobility measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180514 | - | - | - |
R1‑1805140 | Remaining Details on Radio Link Monitoring | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805141 | Draft CR to 38.300 on functionality related to 38.21x | Editor (Nokia) | imported from 3GU |
R1‑1805142 | Open issues on time domain resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805143 | Power control for EN-DC option 4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805144 | On Evaluation of the Mobility Parameter for IMT-202 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805145 | Spectral Efficiency Results for the IMT-2020 Self-Evaluation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805146 | Missing agreements from agreed text proposals at RAN1#92 | Ericsson, LG Electronics | imported from 3GU |
R1‑1805147 | Text proposal on 1ms HARQ bits inclusion in UL sTTI in case of SPS and HARQ process sharing | Ericsson | imported from 3GU |
R1‑1805148 | Text proposal on TPC timing with DCI format 3/3A and short TTI operation | Ericsson, LG Electronics, Nokia, Nokia Shanghai Bell, Qualcomm | imported from 3GU |
R1‑1805149 | TP to 36.211 Excluding TDM support for subslot CRS-based SPDCCH and DMRS-based PDSCH | Ericsson, Nokia, Nokia Shanghai Bell, Intel, Huawei, HiSilicon, Qualcomm, LG Electronics | imported from 3GU |
R1‑180515 | - | - | - |
R1‑1805150 | Clarification on HARQ sequence for sPT, FS1 and fixed codebook size (36.212) | Ericsson, Qualcomm | imported from 3GU |
R1‑1805151 | Considerations of DMRS design with large number of UEs | ETRI | imported from 3GU |
R1‑1805152 | Initial LLS results for low-rate code and signature based shared access NOMA scheme | ETRI | imported from 3GU |
R1‑1805153 | TBS determination for partial UL subframes | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1805154 | Collision of AUL and granted transmissions | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1805155 | On uplink multiplexing of transmissions with different reliability requirements | KDDI Corporation | imported from 3GU |
R1‑1805156 | Remaining details on NR PUSCH power control | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805157 | Considerations for PUCCH reliability | Sequans Communications | imported from 3GU |
R1‑1805158 | Considerations for UL multiplexing with different reliability requirements | Sequans Communications | imported from 3GU |
R1‑1805159 | On UE Capabilities for LTE_unlic | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180516 | - | - | - |
R1‑1805160 | Correction to UE behavior in case simultaneous subslot/slot and subframe PDSCH decoding is not supported (36.213) | Ericsson, Nokia, Huawei | imported from 3GU |
R1‑1805161 | Correction to UE sounding procedures (36.213) | Ericsson | imported from 3GU |
R1‑1805162 | URLLC techniques for PDSCH | Ericsson | imported from 3GU |
R1‑1805163 | UL SPS PUSCH performance and HARQ ambiguity resolution | Ericsson | imported from 3GU |
R1‑1805164 | Latency for URLLC | Ericsson | imported from 3GU |
R1‑1805165 | Reliability for URLLC | Ericsson | imported from 3GU |
R1‑1805166 | On Pre-emption in DL | Ericsson | imported from 3GU |
R1‑1805167 | On Pre-emption in UL | Ericsson | imported from 3GU |
R1‑1805168 | On PUCCH/SPUCCH reliability for URLLC | Ericsson | imported from 3GU |
R1‑1805169 | Resource allocation for aerial vehicle | Sony | imported from 3GU |
R1‑180517 | - | - | - |
R1‑1805170 | RSSI distribution of Indoor Enterprise Wi-Fi network data | Charter Communications, Broadcom | imported from 3GU |
R1‑1805171 | Draft CR 36.211 Corrections to sTTI and SPT implementation | Ericsson | imported from 3GU |
R1‑1805172 | Draft CR 36.211, Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE | Ericsson | imported from 3GU |
R1‑1805173 | Draft CR 36.211, Introduction of increased PUSCH spectral efficiency | Ericsson | imported from 3GU |
R1‑1805174 | Draft CR 36.211, Introduction Rel-15 Further NB-IoT enhancements | Ericsson | imported from 3GU |
R1‑1805175 | Draft CR to 38.211 | Ericsson | imported from 3GU |
R1‑1805176 | Further Notes for DCI Size Discussion | Ericsson | imported from 3GU |
R1‑1805177 | On remaining issues of PDCCH structure | Ericsson | imported from 3GU |
R1‑1805178 | On remaining issues of search space | Ericsson | imported from 3GU |
R1‑1805179 | On remaining issues of GC-PDCCH | Ericsson | imported from 3GU |
R1‑180518 | - | - | - |
R1‑1805180 | On remaining issues of DCI | Ericsson | imported from 3GU |
R1‑1805181 | TP for remaining issues of GC-PDCCH | Ericsson | imported from 3GU |
R1‑1805182 | TP for remaining issues of DCI | Ericsson | imported from 3GU |
R1‑1805183 | On UCI Multiplexing on PUCCH | Ericsson | imported from 3GU |
R1‑1805184 | On PUCCH Remaining Issues | Ericsson | imported from 3GU |
R1‑1805185 | On UCI Multiplexing on PUSCH | Ericsson | imported from 3GU |
R1‑1805186 | On PUCCH Resource Allocation | Ericsson | imported from 3GU |
R1‑1805187 | TP on UCI Multiplexing on PUSCH | Ericsson | imported from 3GU |
R1‑1805188 | On DL/UL resource allocation | Ericsson | imported from 3GU |
R1‑1805189 | On remaining issues of scheduling and HARQ management | Ericsson | imported from 3GU |
R1‑180519 | - | - | - |
R1‑1805190 | On remaining issues for CBG based HARQ | Ericsson | imported from 3GU |
R1‑1805191 | On UL data transmission procedure | Ericsson | imported from 3GU |
R1‑1805192 | Multiplexing data with different durations | Ericsson | imported from 3GU |
R1‑1805193 | [DRAFT] Reply LS on formula or table for L1 data rate | Ericsson | imported from 3GU |
R1‑1805194 | TP on RAR grant resource allocation | Ericsson | imported from 3GU |
R1‑1805195 | TP on default resource allocation table and MSG3 table | Ericsson | imported from 3GU |
R1‑1805196 | TP for remaining issues of scheduling and HARQ management | Ericsson | imported from 3GU |
R1‑1805197 | TP for DL and UL semi-persistent scheduling | Ericsson | imported from 3GU |
R1‑1805198 | [DRAFT] Reply LS on LTE peak data-rate calculation for EN-DC | Ericsson | imported from 3GU |
R1‑1805199 | On BWP adaptation | Ericsson | imported from 3GU |
R1‑180520 | - | - | - |
R1‑1805200 | On remaining issues of carrier aggregation | Ericsson | imported from 3GU |
R1‑1805201 | TP on remaining issues of carrier aggregation | Ericsson | imported from 3GU |
R1‑1805202 | Remaining issues for NR power control | Ericsson | imported from 3GU |
R1‑1805203 | Remaining issues for CA and power sharing | Ericsson | imported from 3GU |
R1‑1805204 | Remaining issues on closed loop power control | Ericsson | imported from 3GU |
R1‑1805205 | Power control for UL MIMO | Ericsson | imported from 3GU |
R1‑1805206 | Corrections to 38.212 | Ericsson | imported from 3GU |
R1‑1805207 | Corrections to 38.213 | Ericsson | imported from 3GU |
R1‑1805208 | Corrections to 38.214 | Ericsson | imported from 3GU |
R1‑1805209 | Considerations on NoMA Performance Evaluation | Vodafone Group Plc | imported from 3GU |
R1‑180521 | - | - | - |
R1‑1805210 | Introduction of reduced control plane latency | Ericsson | imported from 3GU |
R1‑1805211 | Control Plane latency reduction | Ericsson | imported from 3GU |
R1‑1805212 | [DRAFT] Reply LS on CP latency reduction | Ericsson | imported from 3GU |
R1‑1805213 | Draft LS reponse to RAN2 on Beam- and Cell- Radio-Link-Monitoring | Ericsson | imported from 3GU |
R1‑1805214 | Draft LS reponse to RAN2 on Message 3 size for NR | Ericsson | imported from 3GU |
R1‑1805215 | Remaining details on Synchronization signal | Ericsson | imported from 3GU |
R1‑1805216 | Remaining details of PBCH | Ericsson | imported from 3GU |
R1‑1805217 | Remaining minimum system information | Ericsson | imported from 3GU |
R1‑1805218 | On other system information delivery | Ericsson | imported from 3GU |
R1‑1805219 | Remaining details on paging design | Ericsson | imported from 3GU |
R1‑180522 | - | - | - |
R1‑1805220 | Remaining details of RACH configurations | Ericsson | imported from 3GU |
R1‑1805221 | Remaining details of RACH procedure | Ericsson | imported from 3GU |
R1‑1805222 | Remaining issues on mobility measurements | Ericsson | imported from 3GU |
R1‑1805223 | Remaining issues for radio link monitoring | Ericsson | imported from 3GU |
R1‑1805224 | On multiple preamble transmissions for contention free random access | Ericsson | imported from 3GU |
R1‑1805225 | L1 reporting on other cells | Ericsson | imported from 3GU |
R1‑1805226 | On IMT-2020 Evaluation methodology | Ericsson | imported from 3GU |
R1‑1805227 | An overview of the IMT-2020 Evaluations | Ericsson | imported from 3GU |
R1‑1805228 | IMT 2020 Evaluations: On eMBB spectral efficiency with NR | Ericsson | imported from 3GU |
R1‑1805229 | IMT 2020 Evaluations: On eMBB user experienced data rate with NR | Ericsson | imported from 3GU |
R1‑180523 | - | - | - |
R1‑1805230 | IMT 2020 Evaluations: On eMBB area traffic capacity with NR | Ericsson | imported from 3GU |
R1‑1805231 | IMT-2020 self-evaluation: mMTC non-full-buffer connection density | Ericsson | imported from 3GU |
R1‑1805232 | IMT-2020 self-evaluation: mMTC full buffer connection density | Ericsson | imported from 3GU |
R1‑1805233 | IMT-2020 self-evaluation: Mobility evaluations for NR | Ericsson | imported from 3GU |
R1‑1805234 | IMT-2020 self-evaluation: Peak data rate and peak spectrum efficiency evaluations for NR | Ericsson | imported from 3GU |
R1‑1805235 | IMT-2020 self evaluation: Radio Network Energy Performance | Ericsson | imported from 3GU |
R1‑1805236 | IMT 2020 Evaluations - CP latency in NR | Ericsson | imported from 3GU |
R1‑1805237 | IMT 2020 Evaluations - UP latency in NR | Ericsson | imported from 3GU |
R1‑1805238 | IMT 2020 Evaluations - Reliability in NR | Ericsson | imported from 3GU |
R1‑1805239 | Remaining issues on channel access for UL partial subframe on LAA Scell | WILUS Inc. | imported from 3GU |
R1‑180524 | - | - | - |
R1‑1805240 | Remaining issues on group-common PDCCH for NR | WILUS Inc. | imported from 3GU |
R1‑1805241 | Discussion on DCI contents and formats | WILUS Inc. | imported from 3GU |
R1‑1805242 | Remaining issues on long PUCCH over multiple slots | WILUS Inc. | imported from 3GU |
R1‑1805243 | Remaining issues on UCI multiplexing between PUCCH and PUSCH | WILUS Inc. | imported from 3GU |
R1‑1805244 | Remaining issues on BWP switching | WILUS Inc. | imported from 3GU |
R1‑1805245 | Remaining issues on HARQ-ACK codebook construction | WILUS Inc. | imported from 3GU |
R1‑1805246 | UCI multiplexing considering URLLC data in PUSCH | WILUS Inc. | imported from 3GU |
R1‑1805247 | Discussion on coexistence between NR-U and 802.11ax | Broadcom | imported from 3GU |
R1‑1805248 | Resource Pool Sharing between V2X Mode 3 and Mode 4 UEs | Fraunhofer HHI | imported from 3GU |
R1‑1805249 | TP to 38.214 on UE processing time definitions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180525 | - | - | - |
R1‑1805250 | Remaining issues on PDSCH rate matching in CORESET | Qualcomm Incorporated | imported from 3GU |
R1‑1805251 | Modifications to the specification for UE procedure for receiving control information | Ericsson | imported from 3GU |
R1‑1805252 | Remaining issues on UCI multiplexing on PUSCH | CATR | imported from 3GU |
R1‑1805253 | Frame structure design in NR-U | CATR | imported from 3GU |
R1‑1805254 | Considerations on LBT in NR-based access to unlicensed spectrum | CATR | imported from 3GU |
R1‑1805255 | Consideration on a basic receiver for NOMA schemes | CATR | imported from 3GU |
R1‑1805256 | Preliminary link level simulation results of non-orthogonal multiple-access schemes | CATR | imported from 3GU |
R1‑1805257 | V2X NR evaluation criterions | OnStar | imported from 3GU |
R1‑1805258 | V2X NR evaluation scenarios | OnStar | imported from 3GU |
R1‑1805259 | V2X NR channel model | OnStar | imported from 3GU |
R1‑180526 | - | - | - |
R1‑1805260 | Corrections related to interaction between different TTI lengths | LG Electronics, Ericsson | imported from 3GU |
R1‑1805261 | Remaining details on TRS design | Spreadtrum Communications | imported from 3GU |
R1‑1805262 | Issues related to Long PUCCH | ZTE, Sanechips | imported from 3GU |
R1‑1805263 | Search space design and related issues | ZTE, Sanechips | imported from 3GU |
R1‑1805264 | LS on RAN2 agreements on RRM | RAN2, Huawei | imported from 3GU |
R1‑1805265 | Introduction of enhancements to operation in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1805266 | Discussion on remaining issues for time domain resource allocation | CMCC | imported from 3GU |
R1‑1805267 | Remaining issues on CSI measurement | Ericsson | imported from 3GU |
R1‑1805268 | On further study of compact DCI for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805269 | Aspects related to DL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑180527 | - | - | - |
R1‑1805270 | Aspects related to UL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑1805271 | Downlink Enhancements for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1805272 | Summary on Flexible PDSCH/PUSCH starting PRB | Samsung | imported from 3GU |
R1‑1805273 | Correction on TBS determination for msg 3 retransmission and CSS for fallback | Samsung | imported from 3GU |
R1‑1805274 | Evaluation Methodology for NR IAB | Samsung | imported from 3GU |
R1‑1805275 | Work plan for Integrated Access and Backhaul Study Item | Samsung, Qualcomm, AT&T, KDDI | imported from 3GU |
R1‑1805276 | On Evaluation of the Mobility Parameter for IMT-202 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805277 | Summary on CA Aspects | Samsung | imported from 3GU |
R1‑1805278 | SRS antenna switching for 1T4R and 2T4R | Qualcomm Incorporated | imported from 3GU |
R1‑1805279 | Collision with NPRACH in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑180528 | - | - | - |
R1‑1805280 | Correction on DMRS scrambling ID for semi-open loop transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1805281 | Correction on DMRS scrambling ID for semi-open loop transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1805282 | Introduction of SRS antenna switching for 4 ports in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1805283 | Summary on Maximum time reduction between packet arrival at layer 1 and resource selection for transmission | CATT | imported from 3GU |
R1‑1805284 | On NPRS for OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑1805285 | NPRACH false alarm reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1805286 | On more flexible PDSCH/PUSCH resource allocation | Sharp | imported from 3GU |
R1‑1805287 | Feature lead summary for EDT in eMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1805288 | Feature lead summary for WUS functions in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805289 | Feature lead summary for WUS configurations and procedures in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑180529 | - | - | - |
R1‑1805290 | Feature lead summary for detailed design of WUS in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805291 | Feature lead summary for EDT in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805292 | Feature lead summary for physical layer scheduling request | Huawei, HiSilicon | imported from 3GU |
R1‑1805293 | Feature lead summary for SPS | Huawei, HiSilicon | imported from 3GU |
R1‑1805294 | Discussion on the configuration of UL 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1805295 | On the configuration of UL 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1805296 | On the configuration of UL 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1805297 | NPRACH Reliability Enhancement | Qualcomm Incorporated | imported from 3GU |
R1‑1805298 | Ordering of P-CSI plus SR in eCA | Qualcomm Incorporated | imported from 3GU |
R1‑1805299 | Ordering of P-CSI plus SR in eCA | Qualcomm Incorporated | imported from 3GU |
R1‑180530 | - | - | - |
R1‑1805300 | Ordering of P-CSI plus SR in eCA | Qualcomm Incorporated | imported from 3GU |
R1‑1805301 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1805302 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1805303 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1805304 | LS on Capabilities for advanced CSI in FD-MIMO | Qualcomm Incorporated | imported from 3GU |
R1‑1805305 | efeMTC Key Issue Summary for PUSCH Sub-PRB Allocation | Sierra Wireless | imported from 3GU |
R1‑1805306 | Feature summary of Reduced system acquisition time for MTC | Ericsson | imported from 3GU |
R1‑1805307 | Draft LS on Capabilities for SRS carrier switching | Qualcomm Incorporated | imported from 3GU |
R1‑1805308 | Summary of 6.2.6.3 Downlink channel power efficiency | Qualcomm | imported from 3GU |
R1‑1805309 | Summary of 6.2.7.2 Reduced system acquisition time | Qualcomm | imported from 3GU |
R1‑180531 | - | - | - |
R1‑1805310 | Correction to UE sounding procedures (36.213) | Ericsson | imported from 3GU |
R1‑1805311 | Summary of Uplink HARQ-ACK feedback for MTC | ZTE, Sanechips | imported from 3GU |
R1‑1805312 | Summary of DL aspects for TDD NB-IoT | ZTE, Sanechips | imported from 3GU |
R1‑1805313 | Summary of UL aspects for TDD NB-IoT | ZTE, Sanechips | imported from 3GU |
R1‑1805314 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE | Ericsson | imported from 3GU |
R1‑1805315 | Introduction of high capacity stationary wireless link and 1024QAM into 36.212 | Huawei | imported from 3GU |
R1‑1805316 | Introduction of Downlink 1024QAM into 36.201 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805317 | On UL TPC initialization after UL shorter TTI configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805318 | Correction on layer-to-port mapping for feCoMP | Huawei, HiSilicon | imported from 3GU |
R1‑1805319 | Correction on the index of codewords for feCoMP | Huawei, HiSilicon | imported from 3GU |
R1‑180532 | - | - | - |
R1‑1805320 | WF on WUS sequence design | Qualcomm, Samsung, LGE, ZTE, SaneChips, Ericsson, MediaTek | imported from 3GU |
R1‑1805321 | Reply LS on CP latency reduction | Ericsson | imported from 3GU |
R1‑1805322 | Blind/HARQ-less Repetition for Scheduled DL-SCH Operation | Huawei, HiSilicon | imported from 3GU |
R1‑1805323 | Introduction of SRS antenna switching for 4 ports in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1805324 | WF on SPS for NB-IoT in Rel-15 | NTT DOCOMO | imported from 3GU |
R1‑1805325 | Introduction of reduced control plane latency | Ericsson | imported from 3GU |
R1‑1805326 | Summary of offline discussion for resource pool sharing between Mode-3 UE and Mode-4 UE | NTT DOCOMO | imported from 3GU |
R1‑1805327 | Clarification on CRC attachment for DL-SCH and PCH transport channels in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805328 | Summary of offline discussion on support of 64-QAM for LTE V2V communication | Intel Corporation | imported from 3GU |
R1‑1805329 | Correction on TPC field in DCI format 6-1A | Huawei, HiSilicon | imported from 3GU |
R1‑180533 | - | - | - |
R1‑1805330 | Correction on TPC field in DCI format 6-1A | Huawei, HiSilicon | imported from 3GU |
R1‑1805331 | Correction on PUSCH hopping parameter for eVoLTE | ZTE, CMCC | imported from 3GU |
R1‑1805332 | Correction on PUSCH hopping parameter for eVoLTE | ZTE, CMCC | imported from 3GU |
R1‑1805333 | Correction on PUSCH hopping parameter for eVoLTE | ZTE, CMCC | imported from 3GU |
R1‑1805334 | [DRAFT] LS on small-delay CDD for V2X Phase 2 | Huawei, HiSilicon | imported from 3GU |
R1‑1805335 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.201 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805336 | Additions to TS 36.213 (Rel-14) to capture agreements for Rel-15 FeLAA | Ericsson | imported from 3GU |
R1‑1805337 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1805338 | On the configuration of UL 256QAM | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805339 | On the configuration of UL 256QAM | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180534 | - | - | - |
R1‑1805340 | Introduction of enhancements to operation in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1805341 | Summary of section 6.2.6.7 on CQI for 64QAM for efeMTC | Sony | imported from 3GU |
R1‑1805342 | Summary of simulation results regarding HARQ-less repetition for scheduled DL-SCH | Huawei, HiSilicon | imported from 3GU |
R1‑1805343 | Detailed design of wake-up signal for NB-IoT | Ericsson | imported from 3GU |
R1‑1805344 | Feature lead summary NPRACH reliability and range enhancements | Ericsson | imported from 3GU |
R1‑1805345 | Feature lead summary NB-IoT small cell support improvement | Ericsson | imported from 3GU |
R1‑1805346 | Feature lead summary Narrowband measurement accuracy improvements | Ericsson | imported from 3GU |
R1‑1805347 | Reply LS on CP latency reduction | Ericsson | imported from 3GU |
R1‑1805348 | WF on SIB1-NB transmission on a non-anchor carrier in TDD | LG Electronics, Ericsson, Lenovo, Motorola mobility | imported from 3GU |
R1‑1805349 | Summary of TDD Common aspects | LG Electronics | imported from 3GU |
R1‑180535 | - | - | - |
R1‑1805350 | WF on NPUSCH transmission in UL/DL configuration #3 | LG Electronics | imported from 3GU |
R1‑1805351 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel | Ericsson | imported from 3GU |
R1‑1805352 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel | Ericsson | imported from 3GU |
R1‑1805353 | Fallback DCI for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑1805354 | Text proposal on 1ms HARQ bits inclusion in UL sTTI in case of SPS and HARQ process sharing | Ericsson | imported from 3GU |
R1‑1805355 | WF on DL Categories | Intel, Qualcomm | imported from 3GU |
R1‑1805356 | WF on UL Power Control Enhancements for Aerials | Ericsson, ZTE, Sanechips, Nokia, NSB, Sony, CMCC | imported from 3GU |
R1‑1805357 | Introduction of Enhancing CA Utilization into 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805358 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑1805359 | Fallback DCI for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑180536 | - | - | - |
R1‑1805360 | Fallback DCI for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑1805361 | Correction on TBS determination for msg 3 retransmission and CSS for fallback | Samsung | imported from 3GU |
R1‑1805362 | Correction on TBS determination for msg 3 retransmission and CSS for fallback | Samsung | imported from 3GU |
R1‑1805363 | Text proposal on TBS determination for uplink DMRS position pattern DDD | Huawei, HiSilicon | imported from 3GU |
R1‑1805364 | Correction on Msg3 power control for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805365 | Correction on Msg3 power control for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805366 | Text proposal on TBS determination for downlink pattern DDD | Huawei, HiSilicon | imported from 3GU |
R1‑1805367 | Collision with NPRACH in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑1805368 | Collision with NPRACH in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑1805369 | On NRS presence in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑180537 | - | - | - |
R1‑1805370 | On NRS presence in non-anchor carriers | Qualcomm Incorporated | imported from 3GU |
R1‑1805371 | On the configuration of UL 256QAM | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805372 | On the configuration of UL 256QAM | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805373 | Correction on look-ahead for SRS carrier switching | Qualcomm Inc | imported from 3GU |
R1‑1805374 | Correction on look-ahead for SRS carrier switching | Qualcomm Inc | imported from 3GU |
R1‑1805375 | Correcting wrong entry in K_PUSCH Table for FS2 slot-PUSCH in 36.213 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R1‑1805376 | LS on Capabilities for SRS carrier switching | Qualcomm Incorporated | imported from 3GU |
R1‑1805377 | Introduction of Enhancing CA Utilization into 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805378 | WF on altitude threshold for Aerials | Sony, Ericsson, ZTE | imported from 3GU |
R1‑1805379 | LS on altitude threshold for Aerials | Sony | imported from 3GU |
R1‑180538 | - | - | - |
R1‑1805380 | Reply LS on PC5 transmission mechanism selection | SA2, LG Electronics | imported from 3GU |
R1‑1805381 | LS on Aerials | Ericsson | imported from 3GU |
R1‑1805382 | Summary of offline discussion on PC5 CA synchronization | Ericsson | imported from 3GU |
R1‑1805383 | Draft LS on RAN1 Agreements from RAN1#92bis and on the introduction of multiple altitude thresholds | Ericsson | imported from 3GU |
R1‑1805384 | Remaining issues of 6.2.6.3 Downlink channel power efficiency | Qualcomm | imported from 3GU |
R1‑1805385 | WF for Reduced system acquisition time for MTC | Ericsson, Nokia, NSB, Sony, Intel, Sierra Wireless | imported from 3GU |
R1‑1805386 | PUSCH Sub-PRB DCI Possible Agreements | Sierra Wireless | imported from 3GU |
R1‑1805387 | UL index based scheduling flexibility for SPT for UL DL configuration #6 and SSC10 | ZTE, Sanechips | imported from 3GU |
R1‑1805388 | LS on RAN1 Agreements from RAN1#92bis and on the introduction of multiple altitude thresholds | RAN1, Ericsson | imported from 3GU |
R1‑1805389 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑180539 | - | - | - |
R1‑1805390 | Resource Pool Sharing (Option 1-4) | OPPO | imported from 3GU |
R1‑1805391 | WF on Reporting Mechanism for Resource Pool Sharing by Mode-3/Mode-4 Ues | ZTE, Sanechip, Fraunhofer HHI, InterDigital, ITRI | imported from 3GU |
R1‑1805392 | Summary of offline discussion for resource pool sharing between Mode-3 UE and Mode-4 UE | NTT DOCOMO | imported from 3GU |
R1‑1805393 | Summary of Mode 4 CA | LG Electronics | imported from 3GU |
R1‑1805394 | Corrections to sTTI and SPT implementation | Ericsson | imported from 3GU |
R1‑1805395 | Revised summary on Maximum time reduction between packet arrival at layer 1 and resource selection for transmission | CATT | imported from 3GU |
R1‑1805396 | Introduction of reduced control plane latency | Ericsson | imported from 3GU |
R1‑1805397 | [DRAFT] LS on RRC parameters for V2X Phase 2 | Huawei | imported from 3GU |
R1‑1805398 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑1805399 | Corrections related to DL data channel for sTTI operation | LG Electronics, Ericsson, Nokia, Nokia Shanghai Bell, Intel Corporation | imported from 3GU |
R1‑180540 | - | - | - |
R1‑1805400 | Summary of UL aspects for TDD NB-IoT | Sanechips | imported from 3GU |
R1‑1805401 | WF on channel quality report in Msg3 for NB-IoT | CMCC, ZTE, Sanechip, Samsung, MediaTek | imported from 3GU |
R1‑1805402 | LS on Capabilities for advanced CSI in FD-MIMO | Qualcomm Incorporated | imported from 3GU |
R1‑1805403 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑1805404 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑1805405 | [DRAFT] LS on downlink channel quality report in Msg3 for NB-IoT | CMCC | imported from 3GU |
R1‑1805406 | Corrections for supporting two TBs in case of sTTI-to-TTI dynamic switching (TP#57) | Qualcomm | imported from 3GU |
R1‑1805407 | LS on downlink channel quality report in Msg3 for NB-IoT | RAN1, CMCC | imported from 3GU |
R1‑1805408 | Introduction of reduced control plane latency | Ericsson | imported from 3GU |
R1‑1805409 | Updated Feature lead summary for EDT in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑180541 | - | - | - |
R1‑1805410 | PUSCH Sub-PRB DCI Possible Agreements | Sierra Wireless, Nokia, NSB, Huawei, HiSilicon, Qualcomm, Sony, Sharp, Samsung, Sane Chips, ZTE | imported from 3GU |
R1‑1805411 | Corrections on DAI in 36.212 | Huawei, HiSilicon | imported from 3GU |
R1‑1805412 | On modulation for sTTI operation | Huawei, HiSilicon | imported from 3GU |
R1‑1805413 | WF on NPUSCH transmission with 3.75kHz subcarrier spacing | LG Electronics | imported from 3GU |
R1‑1805414 | Notes from the offline session on LTE URLLC | Ericsson | imported from 3GU |
R1‑1805415 | Notes from the offline session on LTE sTTI | Ericsson | imported from 3GU |
R1‑1805416 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel | Ericsson | imported from 3GU |
R1‑1805417 | On UL TPC initialization after UL shorter TTI configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805418 | Introduction of FeLAA into 36.212 | Huawei | imported from 3GU |
R1‑1805419 | Draft LS on Narrowband measurement accuracy improvements | Ericsson | imported from 3GU |
R1‑180542 | - | - | - |
R1‑1805420 | [DRAFT] LS on additional agreements for shortened TTI and processing time for LTE | Ericsson | imported from 3GU |
R1‑1805421 | Chairman's notes of AI 6.1 ^^Maintenance of E-UTRA Releases 8 - 14 | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1805422 | Chairman's notes of AI 6.2.1 ^^Maintenance of Release 15 Shortened TTI and processing time for LTE | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1805423 | Chairman's notes of AI 6.2.2^^ Maintenance of Release 15 Enhancements to LTE operation in unlicensed spectrum | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1805424 | Chairman's notes of AI 6.2.3^^ Maintenance of Release 15 Enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1805425 | Chairman's notes of AI 6.2.4 ^^Maintenance of Release 15 Further enhancements to Coordinated Multi-Point (CoMP) Operation for LTE | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1805426 | Chairman's notes of AI 6.2.5^^ 3GPP V2X Phase 2 | Ad-Hoc chair (Samsung) | imported from 3GU |
R1‑1805427 | Chairman's notes of AI 6.2.6 ^^Even further enhanced MTC for LTE | Ad-hoc chair (NTT DOCOMO) | imported from 3GU |
R1‑1805428 | Chairman's notes of AI 6.2.7^^ Further enhancements of NB-IoT | Ad-hoc chair (NTT DOCOMO) | imported from 3GU |
R1‑1805429 | Chairman's notes of AI 6.2.8 ^^Ultra Reliable Low Latency Communication for LTE | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑180543 | - | - | - |
R1‑1805430 | Chairman's notes of AI 6.2.9^^ Enhanced LTE Support for Aerial Vehicles | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1805431 | Chairman's notes of AI 6.2.10 ^^Enhancing CA Utilization | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1805432 | Chairman's notes of AI 6.2.11 ^^Others | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1805433 | Draft LS on agreements for ultra reliable low latency communication for LTE | Ericsson | imported from 3GU |
R1‑1805434 | LS on Narrowband measurement accuracy improvements | RAN1, Ericsson | imported from 3GU |
R1‑1805435 | LS on additional agreements for shortened TTI and processing time for LTE | RAN1, Ericsson | imported from 3GU |
R1‑1805436 | RAN1 agreements for Rel-15 Further NB-IoT enhancements | Ericsson | imported from 3GU |
R1‑1805437 | void | ETSI | imported from 3GU |
R1‑1805438 | void | ETSI | imported from 3GU |
R1‑1805439 | void | ETSI | imported from 3GU |
R1‑180544 | - | - | - |
R1‑1805440 | void | ETSI | imported from 3GU |
R1‑1805441 | void | ETSI | imported from 3GU |
R1‑1805442 | void | ETSI | imported from 3GU |
R1‑1805443 | void | ETSI | imported from 3GU |
R1‑1805444 | void | ETSI | imported from 3GU |
R1‑1805445 | void | ETSI | imported from 3GU |
R1‑1805446 | void | ETSI | imported from 3GU |
R1‑1805447 | void | ETSI | imported from 3GU |
R1‑1805448 | void | ETSI | imported from 3GU |
R1‑1805449 | void | ETSI | imported from 3GU |
R1‑1805450 | void | ETSI | imported from 3GU |
R1‑1805451 | void | ETSI | imported from 3GU |
R1‑1805452 | void | ETSI | imported from 3GU |
R1‑1805453 | void | ETSI | imported from 3GU |
R1‑1805454 | void | ETSI | imported from 3GU |
R1‑1805455 | void | ETSI | imported from 3GU |
R1‑1805456 | void | ETSI | imported from 3GU |
R1‑1805457 | void | ETSI | imported from 3GU |
R1‑1805458 | void | ETSI | imported from 3GU |
R1‑1805459 | void | ETSI | imported from 3GU |
R1‑1805460 | void | ETSI | imported from 3GU |
R1‑1805461 | void | ETSI | imported from 3GU |
R1‑1805462 | void | ETSI | imported from 3GU |
R1‑1805463 | void | ETSI | imported from 3GU |
R1‑1805464 | void | ETSI | imported from 3GU |
R1‑1805465 | void | ETSI | imported from 3GU |
R1‑1805466 | void | ETSI | imported from 3GU |
R1‑1805467 | void | ETSI | imported from 3GU |
R1‑1805468 | void | ETSI | imported from 3GU |
R1‑1805469 | void | ETSI | imported from 3GU |
R1‑1805470 | void | ETSI | imported from 3GU |
R1‑1805471 | void | ETSI | imported from 3GU |
R1‑1805472 | void | ETSI | imported from 3GU |
R1‑1805473 | void | ETSI | imported from 3GU |
R1‑1805474 | void | ETSI | imported from 3GU |
R1‑1805475 | void | ETSI | imported from 3GU |
R1‑1805476 | void | ETSI | imported from 3GU |
R1‑1805477 | void | ETSI | imported from 3GU |
R1‑1805478 | void | ETSI | imported from 3GU |
R1‑1805479 | void | ETSI | imported from 3GU |
R1‑1805480 | void | ETSI | imported from 3GU |
R1‑1805481 | void | ETSI | imported from 3GU |
R1‑1805482 | void | ETSI | imported from 3GU |
R1‑1805483 | void | ETSI | imported from 3GU |
R1‑1805484 | void | ETSI | imported from 3GU |
R1‑1805485 | void | ETSI | imported from 3GU |
R1‑1805486 | void | ETSI | imported from 3GU |
R1‑1805487 | void | ETSI | imported from 3GU |
R1‑1805488 | void | ETSI | imported from 3GU |
R1‑1805489 | void | ETSI | imported from 3GU |
R1‑180549 | - | - | - |
R1‑1805490 | void | ETSI | imported from 3GU |
R1‑1805491 | void | ETSI | imported from 3GU |
R1‑1805492 | void | ETSI | imported from 3GU |
R1‑1805493 | void | ETSI | imported from 3GU |
R1‑1805494 | void | ETSI | imported from 3GU |
R1‑1805495 | void | ETSI | imported from 3GU |
R1‑1805496 | void | ETSI | imported from 3GU |
R1‑1805497 | void | ETSI | imported from 3GU |
R1‑1805498 | void | ETSI | imported from 3GU |
R1‑1805499 | void | ETSI | imported from 3GU |
R1‑180550 | - | - | - |
R1‑1805500 | Summary of RAN1#92bis Tdocs on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1805501 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1805502 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1805503 | IMT 2020 Evaluations: On eMBB spectral efficiency with NR | Ericsson | imported from 3GU |
R1‑1805504 | Summary of 7.1.3.1.4 (DCI contents and formats) | Ericsson | imported from 3GU |
R1‑1805505 | Summary of 7.1.3.3.1 (resource allocation) | Ericsson | imported from 3GU |
R1‑1805506 | On DL/UL resource allocation | Ericsson | imported from 3GU |
R1‑1805507 | On UL data transmission procedure | Ericsson | imported from 3GU |
R1‑1805508 | Summary on Paging design | Huawei | imported from 3GU |
R1‑1805509 | Remaining open items on PUCCH resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180551 | - | - | - |
R1‑1805510 | Open issues on aperiodic CSI-RS for non-codebook-based transmission | Samsung | imported from 3GU |
R1‑1805511 | Considerations for CQI and MCS for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1805512 | Summary of Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑1805513 | Summary of Discussion for NR Radio Link Monitoring | Intel | imported from 3GU |
R1‑1805514 | Feature lead summary on beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1805515 | Considerations on CQI /MCS table(s) and related aspects for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1805516 | Summary of 7.1.1.2.3 Other system information delivery | Samsung | imported from 3GU |
R1‑1805517 | Remaining details on search space | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805518 | Summary of open issues related to rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805519 | CQI and MCS Tables for URLLC | Samsung | imported from 3GU |
R1‑180552 | - | - | - |
R1‑1805520 | LS on L2 measurement specification for NR in R15 | SA5, Ericsson | imported from 3GU |
R1‑1805521 | Maintenance for CSI measurement | Qualcomm Incorporated | imported from 3GU |
R1‑1805522 | Summary of SRS | Sony | imported from 3GU |
R1‑1805523 | LS on the transmission of video over PC5 interface | SA4, Samsung | imported from 3GU |
R1‑1805524 | Remaining details on RACH procedure | MediaTek Inc. | imported from 3GU |
R1‑1805525 | Remaining TA related issues | MediaTek Inc. | imported from 3GU |
R1‑1805526 | Review Summary for Al 7.1.3.2.2 PUCCH structure in long-duration | Huawei | imported from 3GU |
R1‑1805527 | Remaining details on RACH procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1805528 | Initial LLS results and SLS evaluation assumptions | Intel Corporation | imported from 3GU |
R1‑1805529 | Summary of Multiplexing data with different transmission durations | vivo | imported from 3GU |
R1‑180553 | - | - | - |
R1‑1805530 | Offline discussion summary for GC-PDCCH | Qualcomm | imported from 3GU |
R1‑1805531 | Summary of views on CSI reporting v1 | Ericsson | imported from 3GU |
R1‑1805532 | IAB scenarios and evaluations | ZTE, Sanechips | imported from 3GU |
R1‑1805533 | Summary of remaining details on PRACH format | Convida Wireless | imported from 3GU |
R1‑1805534 | On NR-LTE coex design | Ericsson GmbH, Eurolab | imported from 3GU |
R1‑1805535 | Summary of offline email discussion on Tx side processing and receiver types for clarification | ZTE, Sanechips | imported from 3GU |
R1‑1805536 | Summary of offline email discussion on system-level evaluation methodology and assumptions for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1805537 | Offline summary AI 7.1.3.1.1 PDCCH structure | NTT DOCOMO | imported from 3GU |
R1‑1805538 | Offline summary AI 7.1.3.1.2 Search space | NTT DOCOMO | imported from 3GU |
R1‑1805539 | Offline summary for AI 7.1.3.3.4 UL data transmission procedure | NTT DOCOMO | imported from 3GU |
R1‑180554 | - | - | - |
R1‑1805540 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1805541 | Feature lead summary 1 of PT-RS | Ericsson | imported from 3GU |
R1‑1805542 | Feature lead summary 2 of PT-RS | Ericsson | imported from 3GU |
R1‑1805543 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1805544 | Feature lead summary of remaining issues for RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1805545 | Summary for CQI and MCS | AT&T | imported from 3GU |
R1‑1805546 | On NR UE feature list | Intel Corporation | imported from 3GU |
R1‑1805547 | On PDCCH Reliability | KT Corp. | imported from 3GU |
R1‑1805548 | Remaining issues on DMRS | KT Corp. | imported from 3GU |
R1‑1805549 | Summary of issues on UL non-codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180555 | - | - | - |
R1‑1805550 | Summary #1 for TRS | MediaTek | imported from 3GU |
R1‑1805551 | Summary of views on CSI reporting v2 | Ericsson | imported from 3GU |
R1‑1805552 | Summary of remaining issues on CSI measurement | ZTE | imported from 3GU |
R1‑1805553 | Offline summary for Al 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1805554 | Summary of remaining issues for UCI multiplexing on PUSCH | Qualcomm | imported from 3GU |
R1‑1805555 | Discussion on network topology for sub-7GHz coexistence evaluations between NR-U and Wi-Fi | Broadcom, Cisco, HPE | imported from 3GU |
R1‑1805556 | TBS determination for HARQ retransmission | Intel | imported from 3GU |
R1‑1805557 | Remaining issues on CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1805558 | [DRAFT] LS on time domain resource allocation | Nokia | imported from 3GU |
R1‑1805559 | Offline discussion summary for GC-PDCCH carrying SFI | Qualcomm | imported from 3GU |
R1‑180556 | - | - | - |
R1‑1805560 | Summary of Partially Overlapped PUCCH Resources | Ericsson | imported from 3GU |
R1‑1805561 | Summary of Remaining Issues on Short PUCCH | Ericsson | imported from 3GU |
R1‑1805562 | Summary of simultaneous transmission and reception of channels/signals | Intel Corporation | imported from 3GU |
R1‑1805563 | Summary 1 on Remaining issues on Beam Failure Recovery | MediaTek Inc. | imported from 3GU |
R1‑1805564 | Summary of Codebook Based UL Transmission | Intel | imported from 3GU |
R1‑1805565 | WF on remaining issues for beam failure recovery | Intel | imported from 3GU |
R1‑1805566 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1805567 | Three state V2X sidelink channel model | Huawei, HiSilicon, Spirent Communications, Panasonic, Cohere Technologies, ITRI, Intel, InterDigital, CATT, NEC, Keysight Technologies, Qualcomm, ZTE, Sanechips, LGE, Fraunhofer HHI, General Motors, Nokia, Nokia Shanghai Bell, AT&T, Sony, Vodafone | imported from 3GU |
R1‑1805568 | Summary of offline for search space | NTT DOCOMO | imported from 3GU |
R1‑1805569 | TP for 38.213 on SFI section 11.1 | Qualcomm Incorporated | imported from 3GU |
R1‑180557 | - | - | - |
R1‑1805570 | Summary of remaining issues on CBG based retransmission | LG Electronics | imported from 3GU |
R1‑1805571 | Summary of NR UL Power Control - CA/DC aspects | Samsung | imported from 3GU |
R1‑1805572 | Summary of 7.1.3.1.4 (DCI contents and formats) | Ericsson | imported from 3GU |
R1‑1805573 | RACH MSG2 to MSG3 delay | Ericsson | imported from 3GU |
R1‑1805574 | Feature lead summary on 2 beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1805575 | Summary of simultaneous transmission and reception of channels/signals | Intel Corporation | imported from 3GU |
R1‑1805576 | LS on NPRS design enhancement for colliding NPRS | RAN4, Qualcomm | imported from 3GU |
R1‑1805577 | Summary of remaining details on PRACH format | Convida Wireless | imported from 3GU |
R1‑1805578 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1805579 | Reply LS on handling of multiple numerologies in FeMBMS | RAN2, Qualcomm | imported from 3GU |
R1‑180558 | - | - | - |
R1‑1805580 | Simulation methodology for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1805581 | Summary of offline discussion on eV2X evaluation methodology | LG Electronics | imported from 3GU |
R1‑1805582 | Summary of PRB Bundling for DL | vivo | imported from 3GU |
R1‑1805583 | Revised Summary 1 on Remaining issues on Beam Failure Recovery | MediaTek | imported from 3GU |
R1‑1805584 | WF on UL PTRS port indication | vivo, Intel, NEC, Lenovo, Motorola Mobility, ZTE, Sanechips, OPPO, Samsung, LG Electronics, MediaTek, Nokia, Nokia Shanghai Bell, Huawei, HiSilicon, CMCC, DOCOMO | imported from 3GU |
R1‑1805585 | WF on Simulation Scenarios for NR-U | Qualcomm, Nokia, NSN | imported from 3GU |
R1‑1805586 | WF on Frame Structure for NR-U | Qualcomm, Ericsson | imported from 3GU |
R1‑1805587 | WF on group/sequence hopping for DFT-S_OFDM PUSCH DMRS | CMCC | imported from 3GU |
R1‑1805588 | Summary of offline email discussion on system-level evaluation methodology and assumptions for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1805589 | Summary of offline discussion on receiver types | ZTE, Sanechips | imported from 3GU |
R1‑180559 | - | - | - |
R1‑1805590 | Evaluation scenarios for NR V2X use cases | Qualcomm Incorporated | imported from 3GU |
R1‑1805591 | WF on PHY Channel Design for NR-U | Qualcomm, Ericsson | imported from 3GU |
R1‑1805592 | WF on PHY Procedures for NR-U | Qualcomm, Ericsson | imported from 3GU |
R1‑1805593 | Feature lead summary on QCL | Nokia | imported from 3GU |
R1‑1805594 | Summary of views on CSI reporting v5 | Ericsson | imported from 3GU |
R1‑1805595 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1805596 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1805597 | Draft LS on Max TBS for PDSCH containing RMSI | Huawei | imported from 3GU |
R1‑1805598 | Offline summary on Max TBS for broadcast PDSCH | Huawei | imported from 3GU |
R1‑1805599 | Summary of remaining issues for UCI multiplexing on PUSCH | Qualcomm | imported from 3GU |
R1‑180560 | - | - | - |
R1‑1805600 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1805601 | Outcome of offline discussion on 7.1.3.1.4 | Ericsson | imported from 3GU |
R1‑1805602 | Outcome of offline discussion on 7.1.3.3.1 | Ericsson | imported from 3GU |
R1‑1805603 | Proposal on aperiodic CSI-RS for non-codebook-based transmission | Samsung | imported from 3GU |
R1‑1805604 | WF on beamFailureRecoveryTimer | InterDigital, MediaTek, Ericsson, ZTE, SaneChips, Huawei, HiSilicon, NTT DOCOMO, Intel, Samsung | imported from 3GU |
R1‑1805605 | RMSI CORESET Configuration Tables for SS SCS = 15 kHz and min CH BW = 10 MHz | Samsung | imported from 3GU |
R1‑1805606 | Summary of offline discussion on CSI measurement | ZTE | imported from 3GU |
R1‑1805607 | Discussion on Approximate Peak Data Rate and Scaling Factor Use Cases | Intel | imported from 3GU |
R1‑1805608 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel | imported from 3GU |
R1‑1805609 | Summary of Offline Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑180561 | - | - | - |
R1‑1805610 | WF on DM-RS scrambling with fallback DCIs | Huawei, HiSilicon | imported from 3GU |
R1‑1805611 | First Summary of Issues for PDSCH/PUSCH’s DM-RS | Qualcomm | imported from 3GU |
R1‑1805612 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1805613 | Offline Discussion on Support of Separate CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑1805614 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1805615 | Outcome of the offline discussion for PUCCH structure in long-duration | Huawei | imported from 3GU |
R1‑1805616 | WF on MAC CE indication delay | Intel | imported from 3GU |
R1‑1805617 | Draft LS on Max TBS for PDSCH containing RMSI | Huawei | imported from 3GU |
R1‑1805618 | Default PDSCH table | Ericsson | imported from 3GU |
R1‑1805619 | LS on small-delay CDD for V2X Phase 2 | RAN1, Huawei | imported from 3GU |
R1‑180562 | - | - | - |
R1‑1805620 | LS on RRC parameters for V2X Phase 2 | RAN1, Huawei | imported from 3GU |
R1‑1805621 | nn | Samsung | imported from 3GU |
R1‑1805622 | nn | Samsung | imported from 3GU |
R1‑1805623 | nn | Samsung | imported from 3GU |
R1‑1805624 | void | Samsung | imported from 3GU |
R1‑1805625 | LS to RAN2 on aperiodic SRS triggering | RAN1, Ericsson | imported from 3GU |
R1‑1805626 | nn | Samsung | imported from 3GU |
R1‑1805627 | nn | Samsung | imported from 3GU |
R1‑1805628 | void | Samsung | imported from 3GU |
R1‑1805629 | Summary of handling UL multiplexing of transmission with different reliability requirements | vivo | imported from 3GU |
R1‑180563 | - | - | - |
R1‑1805630 | Summary of 7.2.2 Study of necessity of a new DCI format | Huawei | imported from 3GU |
R1‑1805631 | Draft reply LS on Message 3 size for NR | NTT DOCOMO, INC., CMCC, Orange, Deutsche Telekom, Vodafone | imported from 3GU |
R1‑1805632 | Summary of Offline Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑1805633 | Offline summary on the study of necessity of PDCCH repetition | Qualcomm | imported from 3GU |
R1‑1805634 | Summary of MSG3 timing discussion | Ericsson | imported from 3GU |
R1‑1805635 | First Summary of Issues for PDSCH/PUSCH’s DM-RS | Qualcomm | imported from 3GU |
R1‑1805636 | Partially overlapped PUCCH resources | Ericsson | imported from 3GU |
R1‑1805637 | Way Forward on UL Power Control Regarding NR Scheduling | MediaTek | imported from 3GU |
R1‑1805638 | Summary of offline discussion on 7.1.3.1.4 part II | Ericsson | imported from 3GU |
R1‑1805639 | WF on default PDCCH and PUCCH beams | LG Electronics | imported from 3GU |
R1‑180564 | - | - | - |
R1‑1805640 | WF on UE capability for SP-SRS | Samsung | imported from 3GU |
R1‑1805641 | Way Forward on NR peak data rate formula | Intel, Samsung, MediaTek, Huawei, HiSilicon, Apple, Vivo, OPPO | imported from 3GU |
R1‑1805642 | Summary of Wednesday offline discussion on Support of Separate CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑1805643 | Summary of discussion on mobility evaluation method and parameters | Huawei | imported from 3GU |
R1‑1805644 | Summary of discussion on eMBB evaluation method and parameters for FR2 | Huawei | imported from 3GU |
R1‑1805645 | Text Proposals on Polar Codes | Samsung | imported from 3GU |
R1‑1805646 | Repetition for PUSCH mapping Type B | NTT DOCOMO, INC. | imported from 3GU |
R1‑1805647 | Draft reply LS on Message 3 size for NR | NTT DOCOMO, INC., CMCC, Orange, Deutsche Telekom, Vodafone, AT&T | imported from 3GU |
R1‑1805648 | Summary of remaining details on PRACH format | Convida Wireless | imported from 3GU |
R1‑1805649 | [DRAFT] LS on Rx beam selection for RRM measurements | Intel | imported from 3GU |
R1‑180565 | - | - | - |
R1‑1805650 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1805651 | [DRAFT] LS on SSB frequency location of Pscell | Intel | imported from 3GU |
R1‑1805652 | Summary of NTN offline discussions | Thales | imported from 3GU |
R1‑1805653 | LS on Max TBS for PDSCH containing RMSI | RAN1, Huawei | imported from 3GU |
R1‑1805654 | WF on SRS antenna switching | CMCC | imported from 3GU |
R1‑1805655 | Summary of offline for search space | NTT DOCOMO | imported from 3GU |
R1‑1805656 | Offline discussion summary on GC-PDCCH carrying SFI | Qualcomm | imported from 3GU |
R1‑1805657 | Reply LS on Message 3 size for NR | RAN1, NTT DOCOMO | imported from 3GU |
R1‑1805658 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1805659 | Modelling of the Doppler effect in V2V sidelink channel | Huawei, HiSilicon | imported from 3GU |
R1‑180566 | - | - | - |
R1‑1805660 | Feature lead summary on QCL | Nokia | imported from 3GU |
R1‑1805661 | Draft LS on time domain behavior for CSI-RS and CSI-IM | ZTE | imported from 3GU |
R1‑1805662 | [Draft] Reply LS on SI Reception in BWP | LGE, MediaTek | imported from 3GU |
R1‑1805663 | Summary of offline discussion on 7.1.3.3.1 part II | Ericsson | imported from 3GU |
R1‑1805664 | Summary of offline for 7.1.3.3.5 | Ericsson | imported from 3GU |
R1‑1805665 | Offline summary 2 for Al 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1805666 | Summary of remaining issues for UCI multiplexing on PUSCH | Qualcomm | imported from 3GU |
R1‑1805667 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1805668 | WF on DMRS scrambling ID for fall-back DCIs | Samsung | imported from 3GU |
R1‑1805669 | WF on Type I CSI for rank 8 | LG Electronics, Ericsson | imported from 3GU |
R1‑180567 | - | - | - |
R1‑1805670 | TP for chapter 6 of TR38.811 | Huawei, HiSilicon, Thales | imported from 3GU |
R1‑1805671 | Summary of offline discussion on eV2X evaluation methodology | LG Electronics | imported from 3GU |
R1‑1805672 | WF on Simulation Scenarios for IAB SI | AT&T, Ericsson, KDDI, Samsung, Qualcomm, ZTE | imported from 3GU |
R1‑1805673 | Summary of 7.7.1 Enhancements to support NR backhaul links | AT&T | imported from 3GU |
R1‑1805674 | Summary of 7.7.2 Evaluation Methodology for NR IAB | AT&T | imported from 3GU |
R1‑1805675 | WF on Beam Failure Recovery | Samsung | imported from 3GU |
R1‑1805676 | [Draft] LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | CATT | imported from 3GU |
R1‑1805677 | Summary of offline discussion for NR-U | Qualcomm | imported from 3GU |
R1‑1805678 | Summary of SRS | Sony | imported from 3GU |
R1‑1805679 | Summary on Paging design | Huawei | imported from 3GU |
R1‑180568 | - | - | - |
R1‑1805680 | NR-NTN Channel Modeling – Text proposal for the 6th clause of TR38.811 | THALES | imported from 3GU |
R1‑1805681 | Summary of offline email discussion on SLS assumptions | ZTE, Sanechips | imported from 3GU |
R1‑1805682 | Summary of offline discussion on LLS clarifications | ZTE, Sanechips | imported from 3GU |
R1‑1805683 | Offline summary on compact DCI and PDCCH repetition | Qualcomm | imported from 3GU |
R1‑1805684 | URLLC Wednesday Offline summary | vivo | imported from 3GU |
R1‑1805685 | Remaining issues on CSI-RS #2 | Huawei, HiSilicon | imported from 3GU |
R1‑1805686 | Simultaneous Decoding of System Information | Qualcomm | imported from 3GU |
R1‑1805687 | Baseline Capability #1 Remaining Issues | Qualcomm | imported from 3GU |
R1‑1805688 | Aggressive Capability #2 Processing Time | Qualcomm | imported from 3GU |
R1‑1805689 | Summary 2 on Remaining issues on Beam Failure Recovery | MediaTek Inc. | imported from 3GU |
R1‑180569 | - | - | - |
R1‑1805690 | Offline discussion summary on QCL | Nokia | imported from 3GU |
R1‑1805691 | First Summary of Issues for PDSCH/PUSCH’s DM-RS | Qualcomm | imported from 3GU |
R1‑1805692 | Summary of views on CSI reporting v8 | Ericsson | imported from 3GU |
R1‑1805693 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1805694 | Summary #2 for TRS | MediaTek | imported from 3GU |
R1‑1805695 | Summary #2 of SRS | Sony | imported from 3GU |
R1‑1805696 | Summary of Offline Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑1805697 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel | imported from 3GU |
R1‑1805698 | Multiplexing rules for PUCCH resources with the same starting symbols | Ericsson | imported from 3GU |
R1‑1805699 | SR ID for multiple overlapping SR PUCCHs with UCI PUCCH | Ericsson | imported from 3GU |
R1‑180570 | - | - | - |
R1‑1805700 | Draft LS on aperiodic SRS triggering | Ericsson | imported from 3GU |
R1‑1805701 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1805702 | Summary of offline discussion on 7.1.3.3.1 (resource allocation) – part III | Ericsson | imported from 3GU |
R1‑1805703 | Summary of offline discussions on 7.1.3.1.4 (DCI contents and formats) – part III | Ericsson | imported from 3GU |
R1‑1805704 | Feature lead summary 2 of remaining issues for RS multiplexing | Huawei,HiSilicon | imported from 3GU |
R1‑1805705 | Chairman's notes of AI 7.6 SI on NR-based access to unlicensed spectrum | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1805706 | Chairman's notes of 7.3 SI on NR to support non-terrestrial networks | Ad-Hoc chair (Samsung) | imported from 3GU |
R1‑1805707 | Chairman's notes of AI 7.1.7 on NR - UE features | Ad-hoc chair (NTT DOCOMO, AT&T) | imported from 3GU |
R1‑1805708 | Chairman's notes of AI 7.1.6 UL Power control | Ad-Hoc chair (Samsung) | imported from 3GU |
R1‑1805709 | Chairman's notes of AI 7.1.5 NR-LTE co-existence | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑180571 | - | - | - |
R1‑1805710 | Chairman's notes of AI 7.1.4 Channel coding | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1805711 | Chairman's notes of AI 7.1.2 NR MIMO | Ad-Hoc chair (Samsung) | imported from 3GU |
R1‑1805712 | LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth | RAN1, CATT | imported from 3GU |
R1‑1805713 | [Draft] Reply LS response on handling parallel RA procedure and SR procedure | Qualcomm | imported from 3GU |
R1‑1805714 | [Draft] LS on beamFailureRecoveryTimer | Huawei, HiSilicon | imported from 3GU |
R1‑1805715 | [Draft] LS on NR CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1805716 | [DRAFT] LS on beamFailureRecoveryTimer | InterDigital | imported from 3GU |
R1‑1805717 | LS on SSB frequency location of Pscell | RAN1, Intel | imported from 3GU |
R1‑1805718 | [DRAFT] Reply LS on RAN1 on Beam- and Cell- Radio-Link-Monitoring | Intel | imported from 3GU |
R1‑1805719 | Offline summary on CA aspects | Samsung | imported from 3GU |
R1‑180572 | - | - | - |
R1‑1805720 | Offline discussion summary on GC-PDCCH carrying SFI | Qualcomm | imported from 3GU |
R1‑1805721 | Way Forward on LTE Peak Data Rate Calculation for EN-DC | Huawei, HiSilicon, Intel | imported from 3GU |
R1‑1805722 | Summary of offline discussion on non-codebook based UL transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1805723 | Derivation of k0 | Qualcomm | imported from 3GU |
R1‑1805724 | EN-DC TDM with CA | Qualcomm | imported from 3GU |
R1‑1805725 | Offline discussion summary on GC-PDCCH carrying SFI | Qualcomm | imported from 3GU |
R1‑1805726 | Reply LS on SI Reception in BWP | RAN1, LGE, MediaTek | imported from 3GU |
R1‑1805727 | [Draft] LS on active BWP switching delay specification | MediaTek | imported from 3GU |
R1‑1805728 | NR UE features list | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1805729 | Draft LS on NR UE features | NTT DOCOMO, AT&T | imported from 3GU |
R1‑180573 | - | - | - |
R1‑1805730 | Summary 3 on Remaining issues on Beam Failure Recovery | MediaTek Inc. | imported from 3GU |
R1‑1805731 | Summary of text proposals on CBG based retransmission, AI: | LG Electronics | imported from 3GU |
R1‑1805732 | On CGS ordering for NR | Huawei, HiSilicon, ZTE, Sanechips | imported from 3GU |
R1‑1805733 | Outcome of the offline discussion for PUCCH structure in long-duration | Huawei | imported from 3GU |
R1‑1805734 | Final Summary of Issues for PDSCH/PUSCH’s DM-RS | Qualcomm | imported from 3GU |
R1‑1805735 | Summary of offline discussions on 7.1.3.1.4 (DCI contents and formats) – part III | Ericsson | imported from 3GU |
R1‑1805736 | Summary of Offline Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑1805737 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel | imported from 3GU |
R1‑1805738 | Summary of remaining details on PRACH format | Convida Wireless | imported from 3GU |
R1‑1805739 | Draft LS on UL cross carrier beam indication | Samsung | imported from 3GU |
R1‑180574 | - | - | - |
R1‑1805740 | [Draft] LS on NR CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1805741 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1805742 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1805743 | Summary of EN-DC LTE and NR data rate | Intel | imported from 3GU |
R1‑1805744 | Reply LS on eV2X evaluation methodology | SAE C-V2X TC Advanced Application Task-Force, AT&T | imported from 3GU |
R1‑1805745 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1805746 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1805747 | TP to 38.214 on UE processing time definitions | Qualcomm | imported from 3GU |
R1‑1805748 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1805749 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑180575 | - | - | - |
R1‑1805750 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1805751 | [DRAFT] LS on RRC parameters for NR | Ericsson | imported from 3GU |
R1‑1805752 | LS on NR UE features | RAN1, NTT DOCOMO, AT&T | imported from 3GU |
R1‑1805753 | Draft reply LS on LTE peak data rate calculation for EN-DC | Huawei | imported from 3GU |
R1‑1805754 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1805755 | LS on active BWP switching delay specification | RAN1, MediaTek | imported from 3GU |
R1‑1805756 | Draft reply LS on RAN2 agreements on RRM | Huawei | imported from 3GU |
R1‑1805757 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1805758 | draft LS | AT&T | imported from 3GU |
R1‑1805759 | Reply LS response on handling parallel RA procedure and SR procedure | RAN1, Qualcomm | imported from 3GU |
R1‑180576 | - | - | - |
R1‑1805760 | LS on Rx beam selection for RRM measurements | RAN1, Intel | imported from 3GU |
R1‑1805761 | Reply LS on RAN1 on Beam- and Cell- Radio-Link-Monitoring | RAN1, Intel | imported from 3GU |
R1‑1805762 | Reply LS on RAN2 agreements on RRM | RAN1, Huawei | imported from 3GU |
R1‑1805763 | LS for supporting aperiodic TRS | RAN1, AT&T | imported from 3GU |
R1‑1805764 | Summary of offline discussion | Ericsson | imported from 3GU |
R1‑1805765 | LS on RAN1 input to TS38.300 | RAN1, Nokia | imported from 3GU |
R1‑1805766 | LS on RRC parameters for NR | RAN1, Ericsson | imported from 3GU |
R1‑1805767 | Agreement summary for Rel-15 Even further enhanced MTC for LTE | Ericsson | imported from 3GU |
R1‑1805768 | LS on RRC parameter list for L1 configuration of Rel-15 LTE-MTC | RAN1, Ericsson | imported from 3GU |
R1‑1805769 | Corrections on shortened processing time and shortened TTI in 36 212 | Huawei | imported from 3GU |
R1‑180577 | - | - | - |
R1‑1805770 | Introduction of FeLAA into 36.212 | Huawei | imported from 3GU |
R1‑1805771 | Introduction of further enhancements of NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1805772 | Introduction of FeMTC into 36.212 | Huawei, HiSilicon | imported from 3GU |
R1‑1805773 | Introduction of V2X Phase 2 based on LTE | Huawei | imported from 3GU |
R1‑1805774 | draftCR to 38.211 capturing the RAN1#92bis meeting agreements | Ericsson | imported from 3GU |
R1‑1805775 | draftCR to 38.212 capturing the RAN1#92bis meeting agreements | Huawei | imported from 3GU |
R1‑1805776 | draftCR to 38.213 capturing the RAN1#92bis meeting agreements | Samsung | imported from 3GU |
R1‑1805777 | draftCR to 38.214 capturing the RAN1#92bis meeting agreements | Nokia | imported from 3GU |
R1‑1805778 | draftCR to 38.215 capturing the RAN1#92bis meeting agreements | Intel | imported from 3GU |
R1‑1805779 | draftCR to 38.202 capturing the RAN1#92bis meeting agreements | Qualcomm | imported from 3GU |
R1‑180578 | - | - | - |
R1‑1805780 | Corrections to sTTI and SPT implementation | Ericsson | imported from 3GU |
R1‑1805781 | Introduction of enhancements to operation in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1805782 | Reply LS on maximum number of CCs for NR CA | RAN1, NTT DOCOMO | imported from 3GU |
R1‑1805783 | List of physical layer RRC parameters for Ultra Reliable Low Latency Communication for LTE | Ericsson | imported from 3GU |
R1‑1805784 | LS on RRC parameter list for Ultra Reliable Low Latency Communication for LTE | RAN1, Ericsson | imported from 3GU |
R1‑1805785 | LS on RRC and LPP parameter list for further NB-IoT enhancements | RAN1, Huawei | imported from 3GU |
R1‑1805786 | List of RRC and LPP parameters for further NB-IoT enhancements | Huawei | imported from 3GU |
R1‑1805787 | List of RRC parameters for L1 configuration of Rel-15 LTE-MTC | Ericsson | imported from 3GU |
R1‑1805788 | TS 37.213 v0.1.1 Physical layer procedures for shared spectrum channel access | Ericsson | imported from 3GU |
R1‑1805789 | RAN1 agreements for LTE V2X Phase 2 | Huawei | imported from 3GU |
R1‑180579 | - | - | - |
R1‑1805790 | TS 37.213 v0.1.1 Physical layer procedures for shared spectrum channel access | Ericsson | imported from 3GU |
R1‑1805791 | LS on UE Capabilities for LTE_unlic | RAN1, Nokia | imported from 3GU |
R1‑1805792 | CR to 38.202 capturing the RAN1#92bis meeting agreements | Qualcomm | imported from 3GU |
R1‑1805793 | CR to 38.211 capturing the RAN1#92bis meeting agreements | Ericsson | imported from 3GU |
R1‑1805794 | CR to 38.212 capturing the RAN1#92bis meeting agreements | Huawei | imported from 3GU |
R1‑1805795 | CR to 38.213 capturing the RAN1#92bis meeting agreements | Samsung | imported from 3GU |
R1‑1805796 | CR to 38.214 capturing the RAN1#92bis meeting agreements | Nokia | imported from 3GU |
R1‑1805797 | CR to 38.215 capturing the RAN1#92bis meeting agreements | Intel | imported from 3GU |
R1‑1805798 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 | Motorola Mobility Germany GmbH | imported from 3GU |
R1‑1805799 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 | Motorola Mobility Germany GmbH | imported from 3GU |
page generated from database: 2024-07-20 12:15:34