3GPP TDocs (written contributions) at meeting
Meeting: R4-73 - 2014-11-17 to 2014-11-21, San Francisco
meeting id: R4-73 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑146836 | RAN4-73 Meeting Agenda | Chairman | - |
R4‑146837 | RAN4-72Bis Meeting Report | MCC Support | - |
R4‑146838 | Clarification on ETC5 generation for a multi-band BS supports only 3 carriers | Alcatel-Lucent | - |
R4‑146839 | Clarification on ETC5 generation for a multi-band BS supports only 3 carriers | Alcatel-Lucent | - |
R4‑146840 | TP for Rel-13 2DL TR 36.8xx: TIB and RIB values of LTE-A Inter-band Carrier Aggregation of Band 25A and Band 41A (1UL) | Alcatel-Lucent, Sprint | - |
R4‑146841 | TP for Rel-13 2DL TR 36.8xx: TIB and RIB values of LTE-A Inter-band Carrier Aggregation of Band 25A and Band 41C (1UL) | Alcatel-Lucent, Sprint | - |
R4‑146842 | TP for TR 36.853: Specific BS RF requirements for LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | Alcatel-Lucent | - |
R4‑146843 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 12) | Alcatel-Lucent, US Cellular | - |
R4‑146844 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 12) | Alcatel-Lucent, US Cellular | - |
R4‑146845 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 5) | Alcatel-Lucent, Verizon | - |
R4‑146846 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 5) | Alcatel-Lucent, Verizon | - |
R4‑146847 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 4 + 5) | Alcatel-Lucent, Verizon | - |
R4‑146848 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 4 + 5) | Alcatel-Lucent, Verizon | - |
R4‑146849 | Proposals on multi-band BS testing with three or more bands | Alcatel-Lucent | - |
R4‑146850 | New WID: Measurements of A-BDS TRS Performance of Wireless Devices Supporting A-BDS | CATR | - |
R4‑146851 | Clarifications to RSTD values | Spirent Communications | - |
R4‑146852 | Clarifications to RSTD values | Spirent Communications | - |
R4‑146853 | Clarifications to RSTD values | Spirent Communications | - |
R4‑146854 | Clarifications to RSTD values | Spirent Communications | - |
R4‑146855 | Proposed agenda for RAN4#73-UE-RF-AH | Chairman (Nokia Networks) | - |
R4‑146856 | Proposed WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 2, Band 12 and Band 30 (Feature) | AT&T | - |
R4‑146857 | Proposed WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 2, Band 5 and Band 30 (Feature) | AT&T | - |
R4‑146858 | Proposed WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 2, Band 29 and Band 30 | AT&T | - |
R4‑146859 | Proposed WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band2, Band 4, Band 12 and Band 30 | AT&T | - |
R4‑146860 | Proposed WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band2, Band 4, Band 5 and Band 30 | AT&T | - |
R4‑146861 | Proposed WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band2, Band 4, Band 29 and Band 30 | AT&T | - |
R4‑146862 | TR 36.853 LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | AT&T | - |
R4‑146863 | TP for TR 36.833-4-04 v0.1.0: intra-band non-contiguous Carrier Aggregation in Band 4 for 2 uplinks | T-Mobile USA | - |
R4‑146864 | TR 36.833-4-04 v0.1.0: intra-band non-contiguous Carrier Aggregation in Band 4 for 2 uplinks | T-Mobile USA | - |
R4‑146865 | New WID - LTE Carrier Aggregation of CA_25A-26A | Sprint | - |
R4‑146866 | New WID LTE Carrier Aggregation of CA_41A-41D | Sprint | - |
R4‑146867 | New WID - LTE Carrier Aggregation of CA_25A-41D | Sprint | - |
R4‑146868 | CR for corrections to TS 36.112 | TruePosition | - |
R4‑146869 | CR for corrections to TS 36.112 | TruePosition | - |
R4‑146870 | Way forward for D2D-WAN on multiple component carrier operation | Microsoft Corporation | - |
R4‑146871 | TR 36.833-5-42 LTE Advanced Carrier Aggregation in Band 42 for 3DL, v0.2.0 | CATT | - |
R4‑146872 | TP for TR 36.833-5-42 general clause 4: background | CATT | - |
R4‑146873 | UE receiver requirements for 3DL CCs in Band 42 | CATTZTE | - |
R4‑146874 | TP for TR36.833-5-42: required changes for E-UTRA specifications | CATT | - |
R4‑146875 | Introduction of UE requirements for CA_band 42D | CATT | - |
R4‑146876 | Discussion on TBD note in TDD-TDD inter-frequency measurement requirement | CATT | - |
R4‑146877 | Clarification of EUTRA TDD-TDD inter-frequency measurement | CATT | - |
R4‑146878 | Initial simulation result for PDSCH functionality test | CATT | - |
R4‑146879 | EPDCCH requirement for TDD eIMTA | CATT | - |
R4‑146880 | CSI requirement for TDD eIMTA | CATT | - |
R4‑146881 | Reference measurement channel for D2D RX requirement | CATT | - |
R4‑146882 | Text proposal for TR 37.842: EIRP accuracy requirements | CATT | - |
R4‑146883 | Text proposal for TR 37.842: OTA sensitivity requirements | CATT | - |
R4‑146884 | Discussion on minimum specified OTA sensitivity power level | CATT | - |
R4‑146885 | Discussion on RSRP/RSRQ accuracy requirements in high Doppler conditions | CATT | - |
R4‑146886 | Introduction of RSRP/RSRQ measurement accuracy requirements in high Doppler conditions | CATT | - |
R4‑146887 | Initial simulation results for NAICS | CATT | - |
R4‑146888 | Discussion on NAICS UE demodulation requirements | CATT | - |
R4‑146889 | Editorial modification of symbols and abbreviations in 25.173 | CATT | - |
R4‑146890 | Clarification for The special subframe on measurement GAP | CATT | - |
R4‑146891 | Clarification for The special subframe on measurement GAP | CATT | - |
R4‑146892 | Clarification for The special subframe on measurement GAP | CATT | - |
R4‑146893 | Discussion on Rel-12 UE behaviour on measurement GAP | CATT | - |
R4‑146894 | CR for Rel-12 UE behaviour on measurement GAP | CATT | - |
R4‑146895 | CR for PSCell configuration delay requirements | CATT | - |
R4‑146896 | Adding interruption period for SCell (de-)activation with 3DL | CATT | - |
R4‑146897 | Impairment results for SU-MIMO advanced receiver | CATT | - |
R4‑146898 | Initial results for multi-cell test for SU-MIMO advanced receiver | CATT | - |
R4‑146899 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 8 to TS 36.101 | CHTTL | - |
R4‑146900 | Test procedure update for RAT specific requirements | CATT | - |
R4‑146901 | Test procedure update for RAT specific requirements | CATT | - |
R4‑146902 | OTA measurement results on delta between BH and BHH for 20 smart-phones. | Sony Mobile Communications Japan, Inc. | - |
R4‑146903 | Several UE device types UTRA and E-UTRA bands TRP/TRS Requirements Proposal and in Response to GCF LS | Sony Mobile Communications Japan, Inc. | - |
R4‑146904 | RX-filter I.L. comparison between HD and FD. | Sony Mobile Communications Japan, Inc. | - |
R4‑146905 | Test equipment complexity for UE increased carrier monitoring | Anritsu | - |
R4‑146906 | Recommendations on multi-band BS configuration supporting both FDD and TDD bands | Alcatel-Lucent | - |
R4‑146907 | On CA capability column for CA performance requirements | Qualcomm Incorporated | - |
R4‑146908 | CR to remove CA capability column in CA performance test tables (Rel-10) | Qualcomm Incorporated | - |
R4‑146909 | CR to remove CA capability column in CA performance test tables (Rel-11) | Qualcomm Incorporated | - |
R4‑146910 | CR to remove CA capability column in CA performance test tables (Rel-12) | Qualcomm Incorporated | - |
R4‑146911 | LS on CA performance tests | Qualcomm Incorporated | - |
R4‑146912 | CR to specify applicability of CoMP RI test (Rel-11) | Qualcomm Incorporated | - |
R4‑146913 | CR to specify applicability of CoMP RI test (Rel-12) | Qualcomm Incorporated, Anritsu | - |
R4‑146914 | Applicability of intraband non-contiguous CA timing offset test | Qualcomm Incorporated | - |
R4‑146915 | Normal demodulation test for 3 DL CA | Qualcomm Incorporated | - |
R4‑146916 | CR to introduce CQI test for 3 DL CA | Qualcomm Incorporated | - |
R4‑146917 | Simulation results for TDD-FDD CA performance requirements | Qualcomm Incorporated | - |
R4‑146918 | Further discussion on 256QAM demodulation performance | Qualcomm Incorporated | - |
R4‑146919 | CQI test for 256QAM | Qualcomm Incorporated | - |
R4‑146920 | WF on 256QAM capability | Qualcomm Incorporated | - |
R4‑146921 | Further discussion on performance requirements for dual connectivity | Qualcomm Incorporated | - |
R4‑146922 | Simulation result for TDD eIMTA PDSCH demodulation test | Qualcomm Incorporated | - |
R4‑146923 | Further discussion on CSI performance requirements for TDD eIMTA | Qualcomm Incorporated | - |
R4‑146924 | Performance requirement for intra-band contiguous CA with minimum channel spacing | Qualcomm Incorporated | - |
R4‑146925 | Simulation results for PUSCH 3-2 test | Qualcomm Incorporated | - |
R4‑146926 | On MBMS BLER encoding | Qualcomm Incorporated | - |
R4‑146927 | LC-MTC Demodulation Aspects | Qualcomm Incorporated | - |
R4‑146928 | LC-MTC CSI Aspects | Qualcomm Incorporated | - |
R4‑146929 | SU-MIMO Demodulation Aspects | Qualcomm Incorporated | - |
R4‑146930 | Introduction of 256QAM | Nokia Networks | - |
R4‑146931 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑146932 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑146933 | TP to TR36.851 on BS harmonics and IMD analysis for CA of Band 3 and Band 38 | Nokia Networks | - |
R4‑146934 | Specification changes for multi-band operation with more than two bands | Nokia Networks | - |
R4‑146935 | Tx intermodulation corrections | Nokia Networks | - |
R4‑146936 | Tx intermodulation corrections | Nokia Networks | - |
R4‑146937 | Tx intermodulation corrections | Nokia Networks | - |
R4‑146938 | Tx intermodulation corrections | Nokia Networks | - |
R4‑146939 | Multi-band test configurations corrections | Nokia Networks | - |
R4‑146940 | Multi-band test configurations corrections | Nokia Networks | - |
R4‑146941 | Multi-band test configurations corrections | Nokia Networks | - |
R4‑146942 | Multi-band test configurations corrections | Nokia Networks | - |
R4‑146943 | Discussion on multi-cell whitening verification test | LG Electronics | - |
R4‑146944 | Discussion on NAICS performance with PDCCH decoding | LG Electronics | - |
R4‑146945 | Discussion and simulation result for NAICS demodulation performance | LG Electronics | - |
R4‑146946 | Consideration on the remaining UE Rx requirements for 2ULs inter-band CA | LG Electronics | - |
R4‑146947 | Self desense analysis for 2ULs inter-band CA | LG Electronics | - |
R4‑146948 | Introduction of dual uplink inter-band CA in TS 36.101 Rel-12 | LG Electronics, Nokia Corporation, Intel, Qualcomm | - |
R4‑146949 | Introduction of CA band combinations for dual uplik to TS 36.307 Rel-11 | LG Electronics and LG Uplus | - |
R4‑146950 | Introduction of CA band combinations for dual uplink in TS 36.307 Rel-12 | LG Electronics, and LG Uplus | - |
R4‑146951 | [Draft] Reply LS on D2D-WAN UE capability | LG Electronics | - |
R4‑146952 | D2D-WAN capability for simultaneous Transmission and reception | LG Electronics | - |
R4‑146953 | TP on Dual duplexer RF architecture for New MSS band | LG Electronics | - |
R4‑146954 | Simulation results for PUSCH 3-2 test | LG Electronics | - |
R4‑146955 | Simulation results for 256QAM | LG Electronics | - |
R4‑146956 | Impairment simulation results for SU-MIMO advanced receiver | LG Electronics | - |
R4‑146957 | Initial simulation results for eIMTA PDSCH test. | LG Electronics | - |
R4‑146958 | Simulation results of PDSCH performance under EVA600 | LG Electronics | - |
R4‑146959 | Simulation results of control channel performance under EVA600 | LG Electronics | - |
R4‑146960 | Discussion on timing condition of DRS occasion | LG Electronics | - |
R4‑146961 | Discussion on legacy RSRQ when DRS measurement is configured | LG Electronics | - |
R4‑146962 | Simulation results of RSRP and RSRQ for high doppler case | LG Electronics | - |
R4‑146963 | TR 36.877 v0.2.0 | Qualcomm Incorporated | - |
R4‑146964 | TR 36.877 v0.3.0 | Qualcomm Incorporated | - |
R4‑146965 | TP for TR 36.877: On agreed D2D RF core requirements | Qualcomm Incorporated | - |
R4‑146966 | D2D Tx Requirements: Transmit power | Qualcomm Incorporated | - |
R4‑146967 | D2D Tx Requirements: Output power dynamics | Qualcomm Incorporated | - |
R4‑146968 | D2D Tx Requirements: Transmit signal quality | Qualcomm Incorporated | - |
R4‑146969 | D2D Tx Requirements: Output RF spectrum emissions | Qualcomm Incorporated | - |
R4‑146970 | D2D Tx Requirements: Transmit Intermodulation | Qualcomm Incorporated | - |
R4‑146971 | D2D Rx Requirements: Maximum input level | Qualcomm Incorporated | - |
R4‑146972 | D2D Rx Requirements for TDD bands | Qualcomm Incorporated | - |
R4‑146973 | TP for TR 36.877: Updates to RMC for Rx characteristics | Qualcomm Incorporated | - |
R4‑146974 | D2D Rx on FDD bands: REFSENS | Qualcomm Incorporated | - |
R4‑146975 | D2D Rx on FDD bands: Receiver selectivity to Jammer | Qualcomm Incorporated | - |
R4‑146976 | TP for TR 36.877: D2D reception next to UL channel | Qualcomm Incorporated | - |
R4‑146977 | D2D Rx on FDD bands: Spurious emissions, Rx image | Qualcomm Incorporated | - |
R4‑146978 | D2D Rx on FDD bands: Impact to WAN | Qualcomm Incorporated | - |
R4‑146979 | D2D timing error when synchronized to another UE | Qualcomm Incorporated | - |
R4‑146980 | D2D discovery synchronization window | Qualcomm Incorporated | - |
R4‑146981 | CR on RRM requirement for D2D | Qualcomm Incorporated | - |
R4‑146982 | D2D synchronization requirements | Qualcomm Incorporated | - |
R4‑146983 | D2D demodulation performance requirements | Qualcomm Incorporated | - |
R4‑146984 | Revised WID Proposal : Addition of BWs to LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 8, Band 41 and Band 41 | SoftBank Mobile | - |
R4‑146985 | New WID Proposal: LTE Advanced 3 band Carrier Aggregation (3DL/1UL) of Band 8, Band 42 and Band 42 | SoftBank Mobile | - |
R4‑146986 | New WID Proposal: LTE Advanced 3 band Carrier Aggregation (3DL/1UL) of Band 1, Band 8 and Band 28 | SoftBank Mobile | - |
R4‑146987 | New WID Proposal: LTE Advanced 3 band Carrier Aggregation (3DL/1UL) of Band 3, Band 8 and Band 28 | SoftBank Mobile | - |
R4‑146988 | On scheduler based solutions for harmonic issues | SoftBank Mobile | - |
R4‑146989 | TP for Rel-13 2DL TR 36.8xx: Additional relaxation proposal supporting LTE Advanced Carrier Aggregation of Band 1 and Band 40 | KT | - |
R4‑146990 | TP for Rel-13 2DL TR 36.8xx: Additional relaxation proposal supporting LTE Advanced Carrier Aggregation of Band 3 and Band 40 | KT | - |
R4‑146991 | Proposal for MSS band and legacy band 1 treatment | KT | - |
R4‑146992 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 3, and Band 40 | KT | - |
R4‑146993 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 8, and Band 40 | KT | - |
R4‑146994 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 8, and Band 40 | KT | - |
R4‑146995 | TR 36.861 v0.7.0 (LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz) | SK Telecom | - |
R4‑146996 | Scaling of emission requirements for AAS BS | Sumitomo Electric Industries (SEI) | - |
R4‑146997 | Simulation results for small cell 256QAM | CMCC | - |
R4‑146998 | SU-MIMO simulation results for multi-cell scenario | CMCC | - |
R4‑146999 | Summary of CA single carrier demodulation results for 3DL CA | CMCC | - |
R4‑147000 | CR on normal demodulation test for 3DL CA | CMCC | - |
R4‑147001 | Summary of CA single carrier demodulation results for TDD-FDD CA | CMCC | - |
R4‑147002 | CR on normal demodulation test for TDD-FDD CA | CMCC | - |
R4‑147003 | Revision of common RRM requirements for release independent specification | CMCC | - |
R4‑147004 | Text Proposal for TR 36.8xx: deltaTib and deltaRib value for TDD-FDD CA for B8+B41+B41 | CMCC | - |
R4‑147005 | Text Proposal for Rel-13 2DL TR 36.8xx: coexistence study for TDD-FDD CA for B8+B41 | CMCC | - |
R4‑147006 | Text Proposal for TR 36.8xx: deltaTib and deltaRib for TDD-FDD CA for B8+B41 | CMCC | - |
R4‑147007 | UE capability for 256QAM | CMCC | - |
R4‑147008 | Discussion on 2UL CA open issues | CMCC | - |
R4‑147009 | Simulation results for PUSCH 3-2 test | Samsung | - |
R4‑147010 | Simulation results for DRS-RSRQ measurement | Samsung | - |
R4‑147011 | Views on 256QAM demodulation test | Samsung | - |
R4‑147012 | Views on 256QAM CSI test | Samsung | - |
R4‑147013 | On remaining issue for SU-MIMO receiver | Samsung | - |
R4‑147014 | Test purpose and test scope of NAICS demodulation test | Samsung | - |
R4‑147015 | Consideration on test case design of NAICS demodulation test | Samsung | - |
R4‑147016 | Phase 1 simulation results for performance calibration | Samsung | - |
R4‑147017 | Correction to RSTD Intra Frequency Delay Test Case | Samsung | - |
R4‑147018 | Correction to RSTD Intra Frequency Delay Test Case | Samsung | - |
R4‑147019 | Correction to RSTD Intra Frequency Delay Test Case | Samsung | - |
R4‑147020 | Correction to RSTD Inter Frequency Accuracy Test Case | Samsung | - |
R4‑147021 | Correction to RSTD Inter Frequency Accuracy Test Case | Samsung | - |
R4‑147022 | Correction to RSTD Inter Frequency Accuracy Test Case | Samsung | - |
R4‑147023 | Correction to RSTD Intra Frequency Accuracy Test Case | Samsung | - |
R4‑147024 | Correction to RSTD Intra Frequency Accuracy Test Case | Samsung | - |
R4‑147025 | Correction to RSTD Intra Frequency Accuracy Test Case | Samsung | - |
R4‑147026 | Correction to RSTD Intra Frequency Accuracy Test Case | Samsung | - |
R4‑147027 | NS value issues for legacy UE | Samsung | - |
R4‑147028 | TP for Rel-13 3DL TR36.8xx TDD-FDD CA for CA_1A-41C | Samsung | - |
R4‑147029 | TP for Rel-13 3DL TR36.8xx TDD-FDD CA for CA_26A-41C | Samsung | - |
R4‑147030 | Views on AWS-Extension Band plan selection | Samsung | - |
R4‑147031 | Response LS to GCF on OTA Test requirements | Samsung | - |
R4‑147032 | Enhanced performance for Downlink CoMP | Samsung | - |
R4‑147033 | Corrections on ACS requirements for intra-band non-contiguous CA | ZTE | - |
R4‑147034 | A-MPR for Band 42/ 43 UE coexistence | ZTE | - |
R4‑147035 | Consideration on MR/LA BC3 MSR BC requirements | CATT | - |
R4‑147036 | Revision of common RRM requirements for release independent specification | CMCC | - |
R4‑147037 | TR 36.860 v0.11.0 Dual uplink inter-band CA (2014-11) | Huawei | - |
R4‑147038 | Discussion on requirements for CA_B41_B42_B42 | Huawei | - |
R4‑147039 | TP for Rel-12 3DL TR 36.853 delta Tib and delta Rib for CA_B41_B42_B42 | Huawei | - |
R4‑147040 | Summary of email discussion on 256QAM capability | Huawei | - |
R4‑147041 | CR for UE requirements for 256QAM | Huawei, Hisilicon | - |
R4‑147042 | Reply LS on 256QAM | Huawei, Hisilicon | - |
R4‑147043 | CR for BS requirements for 256QAM | Huawei, CATT | - |
R4‑147044 | Further discussion on UE capability for dual connectivity | Huawei | - |
R4‑147045 | New WI Proposal: Introduction of 1447-1467MHz Band for TD-LTE in China | Huawei, CATR | - |
R4‑147046 | Reference sensitivity requirements for CA_B3_B31 | Huawei, Hisilicon | - |
R4‑147047 | TP for Rel-13 2DL TR 36.8xx: TIB and RIB values for CA_20-31 | Huawei, Hisilicon, Orange | - |
R4‑147048 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei, CATT | - |
R4‑147049 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei, CATT | - |
R4‑147050 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei, CATT | - |
R4‑147051 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei, CATT | - |
R4‑147052 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei, CATT | - |
R4‑147053 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei, CATT | - |
R4‑147054 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei, CATT | - |
R4‑147055 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei, CATT | - |
R4‑147056 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei, CATT | - |
R4‑147057 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei, CATT | - |
R4‑147058 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei, CATT | - |
R4‑147059 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei, CATT | - |
R4‑147060 | WF on reference sensitivity for LC MTC UE | Huawei, Hisilicon | - |
R4‑147061 | Introduction of LC MTC into TS 36.101 | Huawei, Hisilicon | - |
R4‑147062 | Discussion on the bracket for TC4 of TS 37.141 | Huawei | - |
R4‑147063 | The applicability of TC4d and TC4e | Huawei | - |
R4‑147064 | Test configuration for MSR BS without GSM SR | Huawei | - |
R4‑147065 | Removal of bracket for UL MIMO | Huawei, Hisilicon | - |
R4‑147066 | Removal of bracket for UL MIMO | Huawei, Hisilicon | - |
R4‑147067 | Removal of bracket for UL MIMO | Huawei, Hisilicon | - |
R4‑147068 | Discussion of 3.5 GHz out of band blocking | Huawei, Hisilicon | - |
R4‑147069 | B42 relaxations for CA | Huawei, Hisilicon | - |
R4‑147070 | TP for R13 2DL TR 36.8xx: UE RF requirements for 5+29 | Huawei, Hisilicon | - |
R4‑147071 | 3+42 UE RF analysis | Huawei, Hisilicon | - |
R4‑147072 | Corection of B29 REFSENS for CA_2A-29A-30A and CA_4A-29A-30A | Huawei, Hisilicon | - |
R4‑147073 | B41 new OOBE AMPR | Huawei, Hisilicon | - |
R4‑147074 | UTRA FDD Notebook TRP/TRS requirements for Bands I and VIII | Huawei, Hisilicon | - |
R4‑147075 | TP EIRP Accuracy estimation for AAS BS | NEC | - |
R4‑147076 | TP EIRP Beam declarations for AAS BS | NEC | - |
R4‑147077 | Time Alignment Error in AAS | NEC | - |
R4‑147078 | TP on AAS OTA Sensitivities | NEC | - |
R4‑147079 | Unwanted Emission Requirement for AAS BS | NEC | - |
R4‑147080 | TP Scaling of emission limits for AAS BS | NEC | - |
R4‑147081 | TP on Conducted Output power Requirements for AAS BS | NEC | - |
R4‑147082 | Conformance testing considerations for conducted requirements for AAS BS | NEC | - |
R4‑147083 | Introduction of PUSCH 3-2 requirements into 36.101 | Huawei, HiSilicon | - |
R4‑147084 | Evaluation for NAICS demodulation performance | Huawei, HiSilicon | - |
R4‑147085 | Discussion on demodulation requirement for NAICS | Huawei, HiSilicon | - |
R4‑147086 | Discussion on CSI requirement for NAICS | Huawei, HiSilicon | - |
R4‑147087 | Discussion and evaluation on PUSCH 3-2 test | Huawei, HiSilicon | - |
R4‑147088 | Discussion and evaluation on eIMTA demodulation requirements | Huawei, HiSilicon | - |
R4‑147089 | Discussion on eIMTA CSI requirements | Huawei, HiSilicon | - |
R4‑147090 | TDD FDD CA demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑147091 | 3DL CA demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑147092 | Text proposal for 3DL and TDD FDD CA demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑147093 | CR on sustained data rate test for 3DL CA | Huawei, HiSilicon | - |
R4‑147094 | CR on sustained data rate test for TDD FDD CA | Huawei, HiSilicon | - |
R4‑147095 | CR on power imbalance test for 3DL CA | Huawei, HiSilicon | - |
R4‑147096 | CR on power imbalance test for TDD FDD CA | Huawei, HiSilicon | - |
R4‑147097 | Simulation results for Band 39 | Huawei, HiSilicon | - |
R4‑147098 | Updated simulation assumptions for 3DL and TDD FDD CA demodulation and CSI tests | Huawei, HiSilicon | - |
R4‑147099 | On SCE demodulation requirements | Huawei, HiSilicon | - |
R4‑147100 | On SCE CSI requirements | Huawei, HiSilicon | - |
R4‑147101 | Updated test cases and simulation assumptions for SCE demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑147102 | On DC UE functionality test and SDR test | Huawei, HiSilicon | - |
R4‑147103 | CR: DC UE performance requirements | Huawei, HiSilicon | - |
R4‑147104 | On MTC demodulation performance requirements | Huawei, HiSilicon | - |
R4‑147105 | On MTC CSI requirements | Huawei, HiSilicon | - |
R4‑147106 | On BS conformance test for TDD FDD CA | Huawei | - |
R4‑147107 | Applicability of CA performance requirements | Huawei, HiSilicon | - |
R4‑147108 | Discussion on demodulation performance and CSI requirements for D2D | Huawei, HiSilicon | - |
R4‑147109 | Discussion on CA test with the minimum spacing | Huawei, HiSilicon | - |
R4‑147110 | Evaluation for demodulation performance requirements under EVA600 | Huawei, HiSilicon | - |
R4‑147111 | Consideration on introduction of new demodulation requirements for CA+X | Huawei, HiSilicon | - |
R4‑147112 | Summary of single cell demodulation alignment and impairment results | Huawei, HiSilicon | - |
R4‑147113 | On SU-MIMO whitening verification with TM3 | Huawei, HiSilicon | - |
R4‑147114 | SU-MIMO single cell demodulation impairment results | Huawei, HiSilicon | - |
R4‑147115 | Maintenance of CA performance requirements (Rel-10) | Huawei, HiSilicon | - |
R4‑147116 | Maintenance of CA performance requirements (Rel-11) | Huawei, HiSilicon | - |
R4‑147117 | Maintenance of CA performance requirements (Rel-12) | Huawei, HiSilicon | - |
R4‑147118 | Delete the incorrect notes for FDD DMRS demodulation tests (Rel-10) | Huawei, HiSilicon | - |
R4‑147119 | Delete the incorrect notes for FDD DMRS demodulation tests (Rel-11) | Huawei, HiSilicon | - |
R4‑147120 | Delete the incorrect notes for FDD DMRS demodulation tests (Rel-12) | Huawei, HiSilicon | - |
R4‑147121 | Gaps for inter-frequency measurements | Qualcomm Incorporated | - |
R4‑147122 | RRM Measurements in High Doppler | Qualcomm Incorporated | - |
R4‑147123 | UE Capabilities for MIMO layer and CSI processes | Qualcomm Incorporated | - |
R4‑147124 | LS on UE Capabilities for MIMO layers and CSI processes | Qualcomm Incorporated | - |
R4‑147125 | CR on MBSFN RS based requirements | Qualcomm Incorporated | - |
R4‑147126 | LS on measurements for MBMS support | Qualcomm Incorporated | - |
R4‑147127 | BLER Reporting Format | Qualcomm Incorporated | - |
R4‑147128 | Link Level Simulation Results for Cell Discovery | Qualcomm Incorporated | - |
R4‑147129 | Wideband Measurements For Cell Discovery | Qualcomm Incorporated | - |
R4‑147130 | RRM Tests for 3CA | Qualcomm Incorporated | - |
R4‑147131 | RLM For MTC Devices | Qualcomm Incorporated | - |
R4‑147132 | Capabilities for Dual Connectivity^^^^^^ | Qualcomm Incorporated | - |
R4‑147133 | Interruptions with DC | Qualcomm Incorporated | - |
R4‑147134 | Correcting requirements for inter-band CA_18-28 in TS36.101 | KDDI, Ericsson | - |
R4‑147135 | Revised WID for CA_B1_B41_B41 -- clarification on contiguous spectra assumed in Band 41 -- | KDDI | - |
R4‑147136 | Revised WID for CA_B26_B41_B41 -- clarification on contiguous spectra assumed in Band 41 -- | KDDI | - |
R4‑147137 | TP for TR36.851: MSD proposal on CA_B1_B28 | KDDI | - |
R4‑147138 | Introduction of inter-band CA_1-28 into TS36.101 | KDDI | - |
R4‑147139 | Introduction of inter-band CA_1-28 into TS36.104 | KDDI | - |
R4‑147140 | Introduction of inter-band CA_1-28 into TS36.141 | KDDI | - |
R4‑147141 | [Rel-10] Introduction of inter-band CA_1-28 into TS36.307 | KDDI | - |
R4‑147142 | [Rel-11] Introduction of inter-band CA_1-28 into TS36.307 | KDDI | - |
R4‑147143 | [Rel-12] Introduction of inter-band CA_1-28 into TS36.307 | KDDI | - |
R4‑147144 | MSD not necessary on CA_B1_B41 | KDDI | - |
R4‑147145 | TP for TR36.xxx: UE RF requirements for CA_B1_B18_B28 | KDDI | - |
R4‑147146 | Working Assumption Required in TD-TD inter-band CA | KDDI | - |
R4‑147147 | TP for TR36.xxx: UE and BS RF requirements for CA_B26_B41_B41 | KDDI | - |
R4‑147148 | Release independent requirements for CA_42D | CATT | - |
R4‑147149 | Release independent requirements for CA_42D | CATT | - |
R4‑147150 | Release independent requirements for CA_42D | CATT | - |
R4‑147151 | Release independent requirements for CA_42D | CATT | - |
R4‑147152 | Release independent requirements for CA_42D | CATT | - |
R4‑147153 | Release independent requirements for CA_42D | CATT | - |
R4‑147154 | B42 and B43 A-MPR values for Case 4 | TeliaSonera | - |
R4‑147155 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑147156 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑147157 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑147158 | Reply LS on: Incomplete requirements for Band 28, 42 and 43 | TeliaSonera | - |
R4‑147159 | Discussion on TDD UL-DL configuration applicability | Huawei,HiSilicon | - |
R4‑147160 | Clarifications on TDD UL-DL configuration applicability for R12 | Huawei,HiSilicon | - |
R4‑147161 | Discussion on CGI reading in CA test cases | Huawei,HiSilicon | - |
R4‑147162 | Wayforward on CGI reading in CA test case list | Huawei,HiSilicon | - |
R4‑147163 | Correction on autonomous time adjustment in MTAG case | Huawei, HiSilicon | - |
R4‑147164 | Introduce RLM requirements for LC-MTC in TS36.133 | Huawei, HiSilicon | - |
R4‑147165 | Simulation evaluation for PSS/SSS acquisition in HD-FDD | Huawei,HiSilicon | - |
R4‑147166 | Clarification on cell identification requirement for LC-MTC UE in HD-FDD | Huawei,HiSilicon | - |
R4‑147167 | Further discussion on the requirement applicability for TDD config 0 | Huawei,HiSilicon | - |
R4‑147168 | Updating the requirements applicability for TDD config 0 | Huawei,HiSilicon | - |
R4‑147169 | Introducing test case for TDD-TDD Inter-frequency event triggered reporting for TDD UL/DL configuration 0 | Huawei,HiSilicon | - |
R4‑147170 | On CRS based measurement requirement for SCE | Huawei,HiSilicon | - |
R4‑147171 | On CSI-RS based measurement requirement for SCE | Huawei,HiSilicon | - |
R4‑147172 | Introducing requirements for small cell enhancement in TS36.133 | Huawei,HiSilicon | - |
R4‑147173 | Email discussion on SCE | Huawei,HiSilicon | - |
R4‑147174 | Wayforward on small cell enhancement | Huawei,HiSilicon | - |
R4‑147175 | Discussion on DRS measurement questions asked by RAN2 | Huawei,HiSilicon | - |
R4‑147176 | Reply LS on DRS based measurements | Huawei,HiSilicon | - |
R4‑147177 | Discussion on PScell configuration/activation time | Huawei,HiSilicon | - |
R4‑147178 | Further analysis on interruption in dual connectivity | Huawei,HiSilicon | - |
R4‑147179 | Introducing interruption requirements for dual connectivity into TS36.133 | Huawei,HiSilicon | - |
R4‑147180 | Clarification on RLM requirement for dual connectivity | Huawei,HiSilicon | - |
R4‑147181 | On UE behaviour after measurement GAP for dual connectivity | Huawei,HiSilicon | - |
R4‑147182 | Introduction of UE transmit Timing requirements for DC | Huawei,HiSilicon | - |
R4‑147183 | Email discussion on interruptions in DC | Huawei,HiSilicon | - |
R4‑147184 | Wayforward on interruptions in DC | Huawei,HiSilicon | - |
R4‑147185 | Feasibility of positioning enhancements for E-UTRA TR 36.855 v0.6.0 | Huawei,HiSilicon | - |
R4‑147186 | Summary on OTDOA enhancement solutions in het-net scenarios | Huawei,HiSilicon | - |
R4‑147187 | Summary on ECID enhancement solutions in het-net scenarios | Huawei,HiSilicon | - |
R4‑147188 | TP on TR36.855 eCID enhancement in non-collocated serving cell scenarios | Huawei,HiSilicon | - |
R4‑147189 | TP on OTDOA enhancement solutions summary for Het-net | Huawei,HiSilicon | - |
R4‑147190 | TP on ECID enhancement solutions summary for Het-net | Huawei,HiSilicon | - |
R4‑147191 | Discussion on RRM requirements for D2D | Huawei,HiSilicon | - |
R4‑147192 | CR on RRM requirements for D2D | Huawei,HiSilicon | - |
R4‑147193 | E-UTRAN TDD event triggered reporting under deactivated SCell in non-DRX for 20MHz+10MHz | Huawei, HiSilicon, CMCC | - |
R4‑147194 | E-UTRAN TDD event triggered reporting on deactivating SCell with PCell interruption in non-DRX for 20MHz+10MHz | Huawei, HiSilicon | - |
R4‑147195 | E-UTRAN TDD RSTD Measurement Reporting Test Case for 20MHz+10MHz | Huawei, HiSilicon, CMCC | - |
R4‑147196 | TDD RSRP for E-UTRAN Carrier Aggregation for 20MHz+10MHz | Huawei, HiSilicon, CMCC | - |
R4‑147197 | TDD RSRQ for E-UTRA Carrier Aggregation for 20MHz+10MHz | Huawei,HiSilicon,CMCC | - |
R4‑147198 | E-UTRAN TDD RSTD Measurement Accuracy in Carrier Aggregation for 20MHz+10MHz | Huawei, HiSilicon, CMCC | - |
R4‑147199 | Discussion on remaining issues of Incmon | Huawei,HiSilicon | - |
R4‑147200 | TDD-FDD CA test case: Event triggered reporting on deactivating Scells in non-DRX with PCell in FDD | Huawei,HiSilicon | - |
R4‑147201 | TDD-FDD CA test case: Event triggered reporting on deactivating Scells and interruption probability (0.5%) without DRX with PCell in FDD | Huawei,HiSilicon | - |
R4‑147202 | Introducing positioning enhancement requirement for UE Rx-Tx accuracy | Huawei,HiSilicon | - |
R4‑147203 | Discussion for RSRP/RSRQ accuracy requirement under high Doppler | Huawei,HiSilicon | - |
R4‑147204 | Way forward on RSRP/RSRQ accuracy requirements under high Doppler | Huawei,HiSilicon | - |
R4‑147205 | Introducing RSRP/RSRQ requirements for high Doppler | Huawei,HiSilicon | - |
R4‑147206 | Correction on CA test cases in R10 | Huawei, HiSilicon | - |
R4‑147207 | Correction on CA test cases in R11 | Huawei, HiSilicon | - |
R4‑147208 | Correction on CA test cases in R12 | Huawei, HiSilicon | - |
R4‑147209 | Motivation for performance enhancement in high speed scenario | Huawei,HiSilicon | - |
R4‑147210 | Potential issue in event triggered reporting under deactivated Scell testing | Huawei,HiSilicon | - |
R4‑147211 | Correction on E-UTRAN TDD - Non-Contention Based Random Access Test For Scell | Huawei, HiSilicon | - |
R4‑147212 | Simulation results for PUSCH3-2 test | ZTE | - |
R4‑147213 | CR of modification on PMI reporting requirements for DL MIMO enhancement | ZTE | - |
R4‑147214 | CR of reference measurement channel for PUSCH3-2 test | ZTE | - |
R4‑147215 | Discussion on CQI reporting requirement for 256QAM | ZTE | - |
R4‑147216 | Discussion on 256QAM demodulation test | ZTE | - |
R4‑147217 | Introduction of RSRP measurement accuracy requirement for DRS based measurement | ZTE | - |
R4‑147218 | Introduction of RSRQ measurement accuracy requirement for DRS based measurement | ZTE | - |
R4‑147219 | Discussion on Intra-frequency DRS requirements under DRX | ZTE | - |
R4‑147220 | Discussion on Inter-frequency DRS requirements under DRX | ZTE | - |
R4‑147221 | Discussion on CRS-based DRSRQ measurement accuracy for SCE | ZTE | - |
R4‑147222 | Discussion on RSRP and RSRQ relative accuracy under high Doppler | ZTE | - |
R4‑147223 | Summary of demodulation results for UL VoIP with enhanced TTI bundling | China Telecom | - |
R4‑147224 | Performance requirements for PUSCH with TTI bundling and enhanced HARQ pattern | China Telecom | - |
R4‑147225 | Test requirements for PUSCH with TTI bundling and enhanced HARQ pattern | China Telecom | - |
R4‑147226 | TP to TR 36.833-4: RRM requirements for 2 UL non-contiguous intraband CA | Nokia Corporation | - |
R4‑147227 | Introduction of minimum requirements for intra-band NC CA with timing offset | Nokia Corporation, Nokia Networks | - |
R4‑147228 | Ecat clarification for iRAT | Nokia Corporation, Nokia Networks | - |
R4‑147229 | Clarification for uplink timing requirements for Dual Connectivity | Nokia Corporation, Nokia Networks | - |
R4‑147230 | Dual Connectivity interrupt discussion and UE power savings | Nokia Corporation, Nokia Networks | - |
R4‑147231 | Interrupt length in asynchronous Dual Connectivity | Nokia Corporation, Nokia Networks | - |
R4‑147232 | RRM Connected state measurements requirements for Dual Connectivity | Nokia Corporation, Nokia Networks | - |
R4‑147233 | 36.133 RRC Connected state requirements for increased carrier monitoring | Nokia Corporation, Nokia Networks | - |
R4‑147234 | 36.133 RRC Idle mode state requirements for increased carrier monitoring | Nokia Corporation, Nokia Networks | - |
R4‑147235 | On the NAICS UE testability framework | Nokia Networks, Nokia Corporation | - |
R4‑147236 | On the blind detection testability in NAICS | Nokia Networks, Nokia Corporation | - |
R4‑147237 | On the NAICS UE functionality and robustness testability | Nokia Networks, Nokia Corporation | - |
R4‑147238 | Link level performance for NAICS receiver | Nokia Networks, Nokia Corporation | - |
R4‑147239 | On the NAICS UE CSI reporting requirements | Nokia Networks, Nokia Corporation | - |
R4‑147240 | A wayforward on 90MHz band plan | Nokia Networks, Nokia Corporation | - |
R4‑147241 | UE coexistence requirement for 2x90MHz band plan with adjacent TDD bands | Nokia Networks, Nokia Corporation | - |
R4‑147242 | TP to TR 36.862: BS spurious emission requirement for the co-existence with 3GPP bands | Nokia Networks | - |
R4‑147243 | Way forward on TDD-FDD multiband BS clarification | Nokia Networks | - |
R4‑147244 | Clarification of multiband TDD-FDD BS in TS36.104 | Nokia Networks | - |
R4‑147245 | Clarification of multiband TDD-FDD BS in TS36.141 | Nokia Networks | - |
R4‑147246 | Clarification of multiband TDD-FDD BS in TS37.104 | Nokia Networks | - |
R4‑147247 | Clarification of multiband TDD-FDD BS in TS37.141 | Nokia Networks | - |
R4‑147248 | Clarification of UL and DL CA configuration | Nokia Networks, Nokia Corporation | - |
R4‑147249 | Clarification of UL and DL CA configuration | Nokia Networks, Nokia Corporation | - |
R4‑147250 | Clarification of UL and DL CA configuration | Nokia Networks, Nokia Corporation | - |
R4‑147251 | LEE requirement for UMTS Band VI | NTT DOCOMO, INC. | - |
R4‑147252 | CR for TS36.133 on Cell phase accuracy for Dual Connectivity | NTT DOCOMO, INC., Alcatel-Lucent, Ericsson, Nokia Networks | - |
R4‑147253 | Consideration on test patterns for PUSCH requirements | NTT DOCOMO, INC. | - |
R4‑147254 | How to solve issues on an antenna connector with some transceivers | NTT DOCOMO, INC. | - |
R4‑147255 | Motivation paper for new Work Item proposal on LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 19 and Band 28 | NTT DOCOMO, INC. | - |
R4‑147256 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 19 and Band 28 | NTT DOCOMO, INC. | - |
R4‑147257 | Motivation paper for new Work Item proposal on LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 21, Band 42 and Band 42 | NTT DOCOMO, INC. | - |
R4‑147258 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 21, Band 42 and Band 42 | NTT DOCOMO, INC. | - |
R4‑147259 | TP for TR36.851 LTE Advanced Carrier Aggregation of Band Combination (19+42) | NTT DOCOMO, INC. | - |
R4‑147260 | TP for TR36.851 LTE Advanced Carrier Aggregation of Band Combination (19+42+42) | NTT DOCOMO, INC. | - |
R4‑147261 | Proposal for clarification of transmitter spurious emission requirements | NTT DOCOMO, INC. | - |
R4‑147262 | Consideration on where to set radiated requirements | NTT DOCOMO, INC. | - |
R4‑147263 | Interference level for co-location transmitter intermodulation | NTT DOCOMO, INC. | - |
R4‑147264 | How to define conducted receiver requirements | NTT DOCOMO, INC. | - |
R4‑147265 | Discussion on UE feature list for SU-MIMO | NTT DOCOMO, INC. | - |
R4‑147266 | Evaluation results for SU-MIMO in single-cell demodulation test | NTT DOCOMO, INC. | - |
R4‑147267 | Evaluation result for multi cell demodulation test for SU-MIMO advanced receiver | NTT DOCOMO, INC. | - |
R4‑147268 | View on additional CSI test for SU-MIMO advanced receiver | NTT DOCOMO, INC. | - |
R4‑147269 | Discussion on UE feature list for NAICS | NTT DOCOMO, INC. | - |
R4‑147270 | View on test scenario for demodulation requirement for NAICS receiver | NTT DOCOMO, INC. | - |
R4‑147271 | RAN4 UE feature list on Rel-12 LTE | NTT DOCOMO, INC. | - |
R4‑147272 | Draft LS on updated LTE Rel-12 UE feature list | NTT DOCOMO, INC. | - |
R4‑147273 | Introduction of 2UL inter-band CA feature into 36.101 | NTT DOCOMO, INC. | - |
R4‑147274 | WF on 2UL inter-band CA protection of GNSS | NTT DOCOMO, INC. | - |
R4‑147275 | [DRAFT] LS on 2UL inter-band CA protection of GNSS | NTT DOCOMO, INC. | - |
R4‑147276 | Rx requirements on 2UL inter-band CA | NTT DOCOMO, INC. | - |
R4‑147277 | Remaining issues on intra-band NC CA | NTT DOCOMO, INC. | - |
R4‑147278 | Introduction of power imbalance requirement into 36.101 | NTT DOCOMO, INC. | - |
R4‑147279 | 2GHz band plan | NTT DOCOMO, INC. | - |
R4‑147280 | Relaxation for multiple 3DL inter-band CA | NTT DOCOMO, INC. | - |
R4‑147281 | 3.5GHz Out-of-band blocking | NTT DOCOMO, INC. | - |
R4‑147282 | TP for TR 36.853: Triplexer characteristics | NTT DOCOMO, INC. | - |
R4‑147283 | MSD analysis on CA_3A-42A and CA_3A-42C | NTT DOCOMO, INC. | - |
R4‑147284 | Introduction of CA_3A-42A and CA_3A-42C into 36.101 | NTT DOCOMO, INC. | - |
R4‑147285 | WF on harmonic filter handling on CA_3A-42A and CA_3A-42C | NTT DOCOMO, INC. | - |
R4‑147286 | Removal square brackets from CA_1A-42A and CA_1A-42C | NTT DOCOMO, INC. | - |
R4‑147287 | Removal square brackets from CA_19A-42A and CA_19A-42C | NTT DOCOMO, INC. | - |
R4‑147288 | How to handle harmonic filter for Class A2 CA configuration | NTT DOCOMO, INC. | - |
R4‑147289 | [DRAFT] LS on capability to identify different implementation for Class A2 | NTT DOCOMO, INC. | - |
R4‑147290 | Handling of 256QAM capability | NTT DOCOMO, INC. | - |
R4‑147291 | [DRAFT] LS on 256QAM capability | NTT DOCOMO, INC. | - |
R4‑147292 | Maximum input level for 256QAM | NTT DOCOMO, INC. | - |
R4‑147293 | Necessity of multiple NS and P-max signaling | NTT DOCOMO, INC. | - |
R4‑147294 | Introduction of RRM requirements for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147295 | Further discussion on UE RRM requirements for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147296 | Report and summary of email discussion on measurement requirements for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147297 | Introduction of measurement requirements for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147298 | [Draft] Reply LS on RRM measurement for DC | NTT DOCOMO, INC. | - |
R4‑147299 | Demodulation test requirement for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147300 | Motivation of New SI proposal: Performance enhancements for high speed scenario | NTT DOCOMO, INC. | - |
R4‑147301 | New SI proposal: Performance enhancements for high speed scenario | NTT DOCOMO, INC. | - |
R4‑147302 | Necessity of UE demodulation requirements under EVA600 environment | NTT DOCOMO, INC. | - |
R4‑147303 | CA capability column in CA performance test tables | NTT DOCOMO, INC. | - |
R4‑147304 | Test cases on IncMon | NTT DOCOMO, INC. | - |
R4‑147305 | Test cases on new RSRQ measurement | NTT DOCOMO, INC. | - |
R4‑147306 | On radiated requirements for AAS | Telecom Italia | - |
R4‑147307 | Discussion on MBMS BLER related reporting | CATT | - |
R4‑147308 | Measurement and reporting of BLER in section 9 | CATT | - |
R4‑147309 | DCH Enhancement Performance Update | MediaTek | - |
R4‑147310 | Contiguous intraband CA receiver notes | Nokia Corporation | - |
R4‑147311 | Contiguous intraband CA receiver notes | Nokia Corporation | - |
R4‑147312 | Contiguous intraband CA receiver notes | Nokia Corporation | - |
R4‑147313 | Contiguous intraband CA receiver notes | Nokia Corporation | - |
R4‑147314 | Band 22 correction in UE to UE co-existance table. | Nokia Corporation | - |
R4‑147315 | Band 22 correction in UE to UE co-existance table. | Nokia Corporation | - |
R4‑147316 | Band 22 correction in UE to UE co-existance table. | Nokia Corporation | - |
R4‑147317 | Addition of non-contiguous uplink intraband CA feature | Nokia Corporation | - |
R4‑147318 | TR 36.833-4 v0.6.0. | Nokia Corporation | - |
R4‑147319 | TP to TR 36.833-4 v0.6.0: Modifications for sub-clauses 1 and 3 | Nokia Corporation | - |
R4‑147320 | TP to TR 36.833-4 v0.6.0: Removal of Annex-A | Nokia Corporation | - |
R4‑147321 | reply LS to RAN2LS on DL CA and support for the lower order DL fall-back modes | Nokia Corporation | - |
R4‑147322 | Correction to non-contiguous downlink intraband CA receiver requirements | Nokia Corporation, Ericsson | - |
R4‑147323 | DRAFT Reply LS on NS values in system information broadcast | Nokia Corporation | - |
R4‑147324 | Comparison of MSD values and proposal for a requirement | Nokia Corporation | - |
R4‑147325 | Framework for MID band relaxations | Nokia Corporation | - |
R4‑147326 | Removal of dRib from CA_1A-7A | Nokia Corporation | - |
R4‑147327 | Correction to table format of allowed channel bandwidths of non-contiguous intraband CA | Nokia Corporation | - |
R4‑147328 | Almost-contiguous resource allocation | Nokia Corporation | - |
R4‑147329 | Clarification to measurement procedure for harmonic exception | Nokia Corporation, Microsoft | - |
R4‑147330 | Band plan proposal for AWS Extension band | DISH Network | - |
R4‑147331 | Text proposal for TR 36.862: Frequency Band Arrangements for 2 GHz LTE Band in Region 1 | DISH Network, Solaris Mobile, Ltd. | - |
R4‑147332 | Text proposal for TR 36.862: List of band specific issues for the 2 GHz band in Region 1 | DISH Network, Solaris Mobile, Ltd. | - |
R4‑147333 | Introduction of TDD-FDD CA test cases | Nokia Networks, Nokia Corporation | - |
R4‑147334 | CR on measurement for MBSFN MDT | Nokia Networks, Nokia Corporation | - |
R4‑147335 | Remaining issues for MBSFN measurement | Nokia Networks, Nokia Corporation | - |
R4‑147336 | Remaining issues of intra-frequency RRM for SCE | Nokia Networks, Nokia Corporation | - |
R4‑147337 | Inter-frequency RRM for SCE | Nokia Networks, Nokia Corporation | - |
R4‑147338 | Discussion on the incoming RAN2 LS on SCE | Nokia Corporation, Nokia Networks | - |
R4‑147339 | Demodulation performance requirements for advanced SU-MIMO UE | NVIDIA | - |
R4‑147340 | NAICS UE capabilities | NVIDIA | - |
R4‑147341 | Discussion on the interference model for NAICS demodulation | NVIDIA | - |
R4‑147342 | Clarification on the complexity of ML-based blind parameter estimation for 2 and 4 CRS AP | NVIDIA | - |
R4‑147343 | Clarification on the complexity of covariance matrix based blind parameter estimation for 2 and 4 CRS AP | NVIDIA | - |
R4‑147344 | Discussion on NAICS CQI derivation | NVIDIA | - |
R4‑147345 | A-MPR simulation results for Band 41 new FCC requirement | Nokia Corporation | - |
R4‑147346 | A-MPR simulation results for Band 42 and 43 co-existence | Nokia Corporation | - |
R4‑147347 | A disruptive approach for OTA TRP TRS | Telecom Italia | - |
R4‑147348 | New UTRA TRP and TRS measurements for band I with head+hands test setup | Telecom Italia | - |
R4‑147349 | UE demodulation performance results due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147350 | 25.101 CR on new reference measurement channels due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147351 | 25.101 CR on performance requirements for UE DCH demodulation during handover due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147352 | 25.101 CR on performance requirements for downlink power control due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147353 | 25.101 CR on performance requirements for UE DCH demodulation in static and multipath fading conditions due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147354 | CM/MPR requirement for HetNet when DPCCH2 is configured | Qualcomm Incorporated | - |
R4‑147355 | 25.101 CR on CM/MPR requirement for HetNet when DPCCH2 is configured | Qualcomm Incorporated | - |
R4‑147356 | E-AGCH performance with TDM granting | Qualcomm Incorporated | - |
R4‑147357 | 25.101 CR on E-AGCH performance requirements with TDM granting | Qualcomm Incorporated | - |
R4‑147358 | Test case to test TTI switching with new Layer 3 UPH measurement | Qualcomm Incorporated | - |
R4‑147359 | 25.133 CR to introduce test case and requirement for 2ms/10ms TTI switching | Qualcomm Incorporated | - |
R4‑147360 | CR on measurement requirements change to monitor additional carriers in idle/CELL_PCH/URA_PCH state | Qualcomm Incorporated | - |
R4‑147361 | CR on measurement requirements change to monitor additional carriers in CELL_FACH/CELL_DCH state | Qualcomm Incorporated | - |
R4‑147362 | Introduction of a new CS for MSR BS without GSM SR | Huawei | - |
R4‑147363 | Discussion of BS PUSCH Performance Test Requirements for CA | Alcatel-Lucent | - |
R4‑147364 | BS PUSCH Performance Test Requirements for CA | Alcatel-Lucent | - |
R4‑147365 | UE behaviours after measurement gap with special subframe | Alcatel-Lucent | - |
R4‑147366 | UE behaviours after measurement gap | Alcatel-Lucent | - |
R4‑147367 | Inter-frequency measurement requirements for small cell enhancements | Alcatel-Lucent | - |
R4‑147368 | Interruption Requirements for Dual Connectivity | Alcatel-Lucent | - |
R4‑147369 | UE behaviours with configuration exceeding minimum UE measurement capability | Alcatel-Lucent | - |
R4‑147370 | Positioning enhancements for HetNet scenarios | Alcatel-Lucent | - |
R4‑147371 | On the multiple-cell test for SU-MIMO | MediaTek | - |
R4‑147372 | Link level simulation results for cell identification | MediaTek | - |
R4‑147373 | Simulation results for PUSCH 3-2 Test | MediaTek | - |
R4‑147374 | Discussion on PDSCH demodulation test for 256QAM | MediaTek | - |
R4‑147375 | Discussion on CSI tests for 256QAM | MediaTek | - |
R4‑147376 | CR on PRS Signal Levels in RSTD Reporting Tests for Carrier Aggregation | Spirent Communications | - |
R4‑147377 | CR on PRS Signal Levels in RSTD Reporting Tests for Carrier Aggregation | Spirent Communications | - |
R4‑147378 | CR on PRS Signal Levels in RSTD Reporting Tests for Carrier Aggregation | Spirent Communications | - |
R4‑147379 | Introduction of UE requirements for PCell interruptions (Rel-11) | Nokia Networks, Nokia Corporation | - |
R4‑147380 | Introduction of UE requirements for PCell interruptions (Rel-12) | Nokia Networks, Nokia Corporation | - |
R4‑147381 | Discussion on IncMon and time when cell is considered to be known by the UE | Nokia Networks, Nokia Corporation | - |
R4‑147382 | 25.133 idle states requirements for IncMon | Nokia Networks, Nokia Corporation | - |
R4‑147383 | 25.133 connected states requirements for IncMon | Nokia Networks, Nokia Corporation | - |
R4‑147384 | Simulation results of UE performance for Implicit Grant handling feature | Nokia Networks | - |
R4‑147385 | Discussion on enabling and disabling of measurement gaps according to SCell activation state | Nokia Networks, Nokia Corporation | - |
R4‑147386 | Discussion on small gap concept | Nokia Networks, Nokia Corporation | - |
R4‑147387 | Update of total reporting criteria for UTRA | Nokia Networks, Nokia Corporation, Ericsson | - |
R4‑147388 | Test equipment complexity for 3 DL CA RRM Test cases | Anritsu | - |
R4‑147389 | AAS EIRP Accuracy Window | Nokia Networks | - |
R4‑147390 | Beam Declaration for AAS EIRP Requirement | Nokia Networks | - |
R4‑147391 | Definition of AAS OTA Sensitivity | Nokia Networks | - |
R4‑147392 | Example Calculation for AAS OTA Reference Sensitivity | Nokia Networks | - |
R4‑147393 | Further Recommendations for AAS OTA Sensitivity Requirement | Nokia Networks | - |
R4‑147394 | Spatial Aspects of AAS OTA Sensitivity Requirement | Nokia Networks | - |
R4‑147395 | AAS TX Intermodulation Requirement | Nokia Networks | - |
R4‑147396 | AAS UEM Scaling Proposal | Nokia Networks | - |
R4‑147397 | Time Alignment Error in AAS | Nokia Networks | - |
R4‑147398 | AAS technical specification structure considerations and recommendations | Nokia Networks | - |
R4‑147399 | Conformance test aspects of AAS EIRP requirement | Nokia Networks | - |
R4‑147400 | Conformance test aspects of AAS sensitivity requirements | Nokia Networks | - |
R4‑147401 | Selection of AAS conformance test methodology | Nokia Networks | - |
R4‑147402 | Proposal for AWS Band Plan Extension | Nokia Networks, Nokia Corporation | - |
R4‑147403 | New WI proposal: LTE Advanced 3 Band Carrier Aggregation (3DL) of Band 39, Band 39 and Band 42 | ZTE | - |
R4‑147404 | New WI proposal: LTE Advanced 3 Band Carrier Aggregation (3DL) of Band 39, Band 42 and Band 42 | ZTE | - |
R4‑147405 | Correction on transmitter intermodulation requirement | ZTE, Nokia Networks, Tejet | - |
R4‑147406 | Correction on transmitter intermodulation requirement | ZTE, Nokia Networks, CATT, Ericsson, Alcatel-Lucent, Tejet | - |
R4‑147407 | Correction on transmitter intermodulation requirement | ZTE, Nokia Networks, Tejet | - |
R4‑147408 | Correction on transmitter intermodulation requirement | ZTE, Nokia Networks, CATT, Ericsson, Alcatel-Lucent, Tejet | - |
R4‑147409 | Correction on transmitter intermodulation requirement | ZTE, Tejet | - |
R4‑147410 | Correction on transmitter intermodulation requirement | ZTE, Tejet | - |
R4‑147411 | Further consideration on 256QAM BS test requirements | ZTE, Tejet | - |
R4‑147412 | On defining EIRP minimum requirement and manufacturers declarations | ZTE, Tejet | - |
R4‑147413 | Additional views on how to define the UEM requirements | ZTE, Tejet | - |
R4‑147414 | AAS RAN4 work beyond Rel-12 timeframe | ZTE, Tejet | - |
R4‑147415 | TR 36.8xx Rel-13 3DL CA skeleton TR | ZTE | - |
R4‑147416 | Rel-13 3DL CA TR 36.8xx version 0.1.0 | ZTE | - |
R4‑147417 | New WID: Support of 256QAM for High Power Base Stations | ZTE | - |
R4‑147418 | Definition of AAS (antenna) connector | ZTE, Tejet | - |
R4‑147419 | AAS hybrid test methodology | ZTE, Tejet | - |
R4‑147420 | Introducing measurement accuracy requirements for UE category 0 in TS36.133 Clause 9 | Huawei, HiSilicon, Ericsson | - |
R4‑147421 | Measurements requirements for UE category 0 with 1 Rx | Ericsson, Huawei,HiSilicon, Alcatel-Lucent | - |
R4‑147422 | Corrections for 3DL inter-band CA band combinations | Ericsson | - |
R4‑147423 | PCell Interruption in Rel-11 CA | Ericsson | - |
R4‑147424 | PCell Interruption in Rel-12 CA | Ericsson | - |
R4‑147425 | UE Behaviour after Measurement Gap in CA | Ericsson | - |
R4‑147426 | Updated List of RRM test cases for TDD-FDD CA | Ericsson | - |
R4‑147427 | CA RRM Testing for Multiple Duplex Modes | Ericsson | - |
R4‑147428 | CA RRM Testing for Fall back CA Configuration | Ericsson | - |
R4‑147429 | Applicable TA for UE Behaviour after Measurement Gap | Ericsson | - |
R4‑147430 | RRM Tests for 3 DL CA | Ericsson | - |
R4‑147431 | Test Case List for RRM Tests for 3 DL CA | Ericsson | - |
R4‑147432 | Scenarios for ECID in Non-co-located Serving Cells | Ericsson | - |
R4‑147433 | Further discussion on RLM parameters setup for LC_MTC | Ericsson | - |
R4‑147434 | Way Forward on RLM Requirements for LC-MTC | Ericsson | - |
R4‑147435 | Further discussion on CSI test and ePDCCH test for eIMTA | Ericsson | - |
R4‑147436 | Simulation results for eIMTA PDSCH demodulation | Ericsson | - |
R4‑147437 | Discussion on D2D receiver regarding soft buffer sharing and soft combining issue | Ericsson | - |
R4‑147438 | New Work Item proposal: CRS Interference Mitigation for LTE Homogenous Deployments | Ericsson | - |
R4‑147439 | EVM requirements for 256QAM for medium range BS | Ericsson | - |
R4‑147440 | CR on EVM requirements for 256QAM | Ericsson | - |
R4‑147441 | Maximum input level | Ericsson | - |
R4‑147442 | Remaining issues for Intra-frequency measurements with DRX | Ericsson | - |
R4‑147443 | Inter-frequency requirements without DRX for DRS measurements | Ericsson | - |
R4‑147444 | Inter-frequency requirements with DRX for DRS measurements | Ericsson | - |
R4‑147445 | RSRQ requirements for CRS based discovery signal. | Ericsson | - |
R4‑147446 | AGC issues for measurement on discovery reference signal | Ericsson | - |
R4‑147447 | LS response on the structure of the discovery reference signal for small cell discovery | Ericsson | - |
R4‑147448 | Applicability of Inter-frequency measurement requirements for TDD configuration 0 | Ericsson | - |
R4‑147449 | CR on inter-frequency measurements for TDD configuration 0 | Ericsson | - |
R4‑147450 | Further consideration on cell FACH reselection tests with secondary broadcast | Ericsson | - |
R4‑147451 | Introduction of test case for UTRA SIB enhancement | Ericsson | - |
R4‑147452 | Analysis of high Doppler absolute measurement accuracy results | Ericsson | - |
R4‑147453 | Introduction of High Doppler measurement accuracy requirements | Ericsson | - |
R4‑147454 | Further considerations on RSRP requirement for release 12 | Ericsson | - |
R4‑147455 | RSRP requirements update | Ericsson | - |
R4‑147456 | Test case for inter-RAT HO to multicarrier UTRA | Ericsson | - |
R4‑147457 | Test case for inter-RAT HO to multicarrier UTRA | Ericsson | - |
R4‑147458 | Further considerations on testing for increased UE carrier monitoring | Ericsson | - |
R4‑147459 | Known and unknown cell definition for increased UE carrier monitoring | Ericsson | - |
R4‑147460 | Requirements for increased carrier monitoring for idle mode 36.133 | Ericsson, CATT | - |
R4‑147461 | Requirements for increased carrier monitoring in RRC connected state 36.133 | Ericsson | - |
R4‑147462 | Requirements for increased carrier monitoring in idle mode 25.133 | Ericsson | - |
R4‑147463 | Requirements for increased carrier monitoring in cell FACH and cell DCH state 25.133 | Ericsson | - |
R4‑147464 | RRM test case for extended DRX cycles | Ericsson | - |
R4‑147465 | DRX cycle for inter-frequency and inter-RAT measurement in dual connectivity | Ericsson | - |
R4‑147466 | LS on for inter-frequency and inter-RAT measurement in dual connectivity | Ericsson | - |
R4‑147467 | On different TDD configurations in CA | Ericsson | - |
R4‑147468 | Different TDD configurations in CA | Ericsson | - |
R4‑147469 | E-UTRAN TDD-FDD CA event triggered reporting under deactivated SCell in non-DRX with PCell in FDD | Ericsson | - |
R4‑147470 | E-UTRAN TDD-FDD CA event triggered reporting under deactivated SCell in non-DRX with PCell in TDD | Ericsson | - |
R4‑147471 | On the MBMS requirements structure | Ericsson | - |
R4‑147472 | MBMS requirements in section 4 | Ericsson | - |
R4‑147473 | MBMS requirements in section 7 | Ericsson | - |
R4‑147474 | MBMS requirements in section 8 | Ericsson | - |
R4‑147475 | MBMS requirements in section 9 | Ericsson | - |
R4‑147476 | MBMS BLER requirements | Ericsson | - |
R4‑147477 | Intra-frequency RSRP measurement requirements with DMTC | Ericsson | - |
R4‑147478 | Intra-frequency RSRP measurement accuracy requirements with DMTC | Ericsson | - |
R4‑147479 | Intra-frequency RSRQ requirements with DMTC | Ericsson | - |
R4‑147480 | On measurement reporting ranges with DMTC | Ericsson | - |
R4‑147481 | Measurement reporting ranges with DMTC | Ericsson | - |
R4‑147482 | Solutions for OTDOA with RRH | Ericsson | - |
R4‑147483 | Solutions for E-CID with RRH | Ericsson | - |
R4‑147484 | TP for TR 36.855: Solutions for OTDOA with RRH | Ericsson | - |
R4‑147485 | TP for 36.855: Solutions for E-CID with RRH | Ericsson | - |
R4‑147486 | RSTD accuracy requirements for smaller and larger bandwidths | Ericsson, AT&T, Verizon Wireless, Alcatel-Lucent | - |
R4‑147487 | Smaller and larger BW accuracy for E-CID | Ericsson | - |
R4‑147488 | On deployment scenarios with RRHs | Ericsson | - |
R4‑147489 | On remaining issues for MBSFN measurements | Ericsson | - |
R4‑147490 | REFSENS Considerations for low complexity MTC UEs | Ericsson | - |
R4‑147491 | REFSENS Requirements for low complexity MTC UEs | Ericsson | - |
R4‑147492 | Draft Way forward on MTC REFSENS Requirements | Ericsson, Verizon | - |
R4‑147493 | D2D Multi-carrier Requirements in Release 12 | Ericsson | - |
R4‑147494 | Multi-carrier D2D and WAN operation | Ericsson | - |
R4‑147495 | TP for TR36.877: D2D UE RF Requirements | Ericsson | - |
R4‑147496 | Impact of D2D on In-band emissions requirements | Ericsson | - |
R4‑147497 | Impact of D2D on UE Transmit RF Requirements | Ericsson | - |
R4‑147498 | D2D Out-of-Coverage Maximum Transmit Power Considerations | Ericsson | - |
R4‑147499 | D2D UE Maximum Receive Power | Ericsson | - |
R4‑147500 | Impact of D2D on UE Receive RF Requirements | Ericsson | - |
R4‑147501 | CR for CA applicability rule in 36.101 in Rel-10 | Ericsson | - |
R4‑147502 | CR for CA applicability rule in 36.101 in Rel-11 | Ericsson | - |
R4‑147503 | CR for CA applicability rule in 36.101 in Rel-12 | Ericsson | - |
R4‑147504 | Updated simulation results for SU-MIMO UE demodulation tests for alignment | Ericsson | - |
R4‑147505 | Discussion for SU-MIMO UE demodulation TM9/TM8 test | Ericsson | - |
R4‑147506 | Test proposal for SU-MIMO UE CSI tests | Ericsson | - |
R4‑147507 | Evaluation of tests for whitening functionality for SU-MIMO receivers | Ericsson | - |
R4‑147508 | UE demodulation and CSI test for Dual Connectivity | Ericsson | - |
R4‑147509 | Test definition and CA capability column for 2 CCs and 3 CCs for Rel-12 | Ericsson | - |
R4‑147510 | Alignment results for single carrier requirement for DL CA with 3 CCs | Ericsson | - |
R4‑147511 | Performance evaluation of TDD-FDD CA with single carrier requirement | Ericsson | - |
R4‑147512 | Evaluation on power imbalance tests for 2 CCs | Ericsson | - |
R4‑147513 | Evaluation on soft buffer tests for TDD-FDD CA with 2 CCs | Ericsson | - |
R4‑147514 | CR for soft buffer tests for TDD-FDD CA in 36.101 in Rel-12 | Ericsson | - |
R4‑147515 | Simulation results for UE performance tests for intra-band contiguous CA with minimum channel spacing | Ericsson | - |
R4‑147516 | Way forward for intra-band contiguous CA with minimum channel spacing in Rel-12 | Ericsson | - |
R4‑147517 | Summary of alignment results for intra-band contiguous CA with minimum channel spacing | Ericsson | - |
R4‑147518 | Discussion and simulation results for high Doppler scenario under EVA600 | Ericsson | - |
R4‑147519 | Extension of HST model to support 400km/h | Ericsson | - |
R4‑147520 | New Work Item on 4Rx AP for LTE DL | Ericsson | - |
R4‑147521 | Motivation paper for new Work Item proposal on 4Rx AP for LTE DL in Rel-13 | Ericsson | - |
R4‑147522 | UMTS HetNet Enhancements requirements for power control | Ericsson, Qualcomm | - |
R4‑147523 | Discussion on UMTS HetNet Enhancements impact on cubic metric (MPR) | Ericsson | - |
R4‑147524 | UMTS HetNet Enhancements impact on cubic metric (MPR) | Ericsson | - |
R4‑147525 | Simulation results for E-AGCH demodulation in EUL enhancement | Ericsson | - |
R4‑147526 | Introduction of E-AGCH demodulation performance requirement for further EUL enhancement | Ericsson | - |
R4‑147527 | Simulation results of PUSCH 3-2 requirement | Ericsson | - |
R4‑147528 | Discussion on Cat 0 UE demodulation requirement | Ericsson | - |
R4‑147529 | Discussion on Cat 0 UE CQI test | Ericsson | - |
R4‑147530 | UE demodulation performance requirement for 256QAM | Ericsson | - |
R4‑147531 | PMCH requirement for 256QAM | Ericsson | - |
R4‑147532 | Clarification of Capability Set per band | Ericsson | - |
R4‑147533 | Clarification of Capability Set per band | Ericsson | - |
R4‑147534 | MSR Medium range BS in BC3 | Ericsson | - |
R4‑147535 | MSR Medium range BS in BC3 | Ericsson | - |
R4‑147536 | Absolute ACLR limit for UTRA | Ericsson | - |
R4‑147537 | Absolute ACLR limit for UTRA | Ericsson | - |
R4‑147538 | Absolute ACLR limit for UTRA | Ericsson | - |
R4‑147539 | Absolute ACLR limit for UTRA | Ericsson | - |
R4‑147540 | EMC testing of multi-band operation for MSR BS | Ericsson, Nokia Networks | - |
R4‑147541 | EMC testing of multi-band operation for MSR BS | Ericsson, Nokia Networks, Alcatel-Lucent | - |
R4‑147542 | EMC testing of multi-band operation for LTE BS | Ericsson, Nokia Networks | - |
R4‑147543 | EMC testing of multi-band operation for MSR BS | Ericsson, Nokia Networks, Alcatel-Lucent | - |
R4‑147544 | Requirements on RRM measurements for D2D UEs | Ericsson | - |
R4‑147545 | Requirements for D2D UE Tx timing | Ericsson | - |
R4‑147546 | Requirements for D2D in connected state | Ericsson | - |
R4‑147547 | Requirements for D2D in idle state | Ericsson | - |
R4‑147548 | Requirements for D2D in OoC state | Ericsson | - |
R4‑147549 | Further simulation results on cell search requirements for HD-FDD MTC UEs | Ericsson | - |
R4‑147550 | TR 36.851 V0.14.0: Rel-12 Inter-band Carrier Aggregation | Ericsson | - |
R4‑147551 | Rel-13 2DL TR 36.8xx: LTE-A Inter-band Carrier Aggregation v0.2.0 | Ericsson | - |
R4‑147552 | New capability set for excluding GSM single-RAT operation | Ericsson, Nokia Networks | - |
R4‑147553 | New capability set for excluding GSM single-RAT operation | Ericsson, Nokia Networks | - |
R4‑147554 | Alternative solution: New capability set for excluding GSM single-RAT operation | Ericsson, Nokia Networks | - |
R4‑147555 | MB and TDD+FDD 37.104 | Ericsson | - |
R4‑147556 | MB and TDD+FDD 36.104 | Ericsson | - |
R4‑147557 | MB and TDD+FDD 37.141 | Ericsson | - |
R4‑147558 | MB and TDD+FDD 36.141 | Ericsson | - |
R4‑147559 | Scope for BS performance test requirements for TDD-FDD CA | Ericsson | - |
R4‑147560 | Scope for BS performance test requirements for TDD-FDD CA | Ericsson | - |
R4‑147561 | Performance requirements and conformance procedures for ^^PUSCH with TTI bundling and enhanced HARQ pattern | Ericsson | - |
R4‑147562 | Performance requirements for PUSCH with TTI bundling and enhanced HARQ pattern | Ericsson | - |
R4‑147563 | Conformance testing for PUSCH with TTI bundling and enhanced HARQ pattern | Ericsson | - |
R4‑147564 | Test scope for UE demodulation under NAICS | Ericsson | - |
R4‑147565 | Discussion on interference model for NAICS | Ericsson | - |
R4‑147566 | On NAICS Capability | Ericsson | - |
R4‑147567 | Non Ideal backhaul | Ericsson | - |
R4‑147568 | Draft LS answer to RAN 3 about RB granularity | Ericsson | - |
R4‑147569 | Fallback behavior | Ericsson | - |
R4‑147570 | Detailed test plan and design | Ericsson | - |
R4‑147571 | Simulation results for FDD | Ericsson | - |
R4‑147572 | Simulation results for TDD | Ericsson | - |
R4‑147573 | Way forward for 4CRS AP | Ericsson, KT, Nokia Networks, Nokia Corporation, S | - |
R4‑147574 | Way forward on NAICS test design | Ericsson, Verizon | - |
R4‑147575 | Test scope for CSI performance under NAICS | Ericsson | - |
R4‑147576 | Draft LS for RAN 1 about CSI reporting post-NAICS. | Ericsson | - |
R4‑147577 | UE requirements for CA_1A-41A and CA_1A-41C | Ericsson, KDDI | - |
R4‑147578 | TP for Rel-12 2DL TR 36.851: TDD-FDD CA for B1+B41 combination (CA_1A-41A) | Ericsson, KDDI | - |
R4‑147579 | TP for Rel-12 2DL TR 36.853: TDD-FDD CA for B1+B41 combination (CA_1A-41A) | Ericsson, KDDI | - |
R4‑147580 | TP for Rel-13 2DLTR 36.8xx: Harmonics and intermodulation analysis of TDD-FDD CA for B20+B40 combination (CA_20A-40A) | Ericsson | - |
R4‑147581 | UE RF requirements for CA_20A-40A | Ericsson | - |
R4‑147582 | Dependency on inter-band CA configurations with 2UL for dual connectivity configurations | Ericsson | - |
R4‑147583 | Further discussions on UE capability issues for DC | Ericsson | - |
R4‑147584 | Introduction of Dual Connectivity to TS 36.101 Rel-12, RF part | Ericsson, InterDigital | - |
R4‑147585 | pSCell activation time for unsynchronized case | Ericsson | - |
R4‑147586 | Measurement gap requirements for DC in 36.133 | Ericsson | - |
R4‑147587 | Introduction of measurement gap requirements for DC in 36.133 | Ericsson | - |
R4‑147588 | Discussion about maximum uplink transmit timing | Ericsson | - |
R4‑147589 | Discussions on 2 UL Inter-band CA and GNSS protection | Ericsson | - |
R4‑147590 | On new and modified NS values for legacy bands | Ericsson | - |
R4‑147591 | Draft Reply LS to RAN2 on NS values in system information broadcast | Ericsson | - |
R4‑147592 | Modifications for NS_12 and NS_13 | Ericsson | - |
R4‑147593 | Modifications for NS_12 and NS_13 | Ericsson | - |
R4‑147594 | On the Class A2 requirements in the specifications | Ericsson | - |
R4‑147595 | TP for TR 36.860: remaining RF RX requirements for uplink inter-band CA | Ericsson | - |
R4‑147596 | Draft LS to RAN2 on signaling for improved GNSS IDC when UL CA is configured | Ericsson | - |
R4‑147597 | Introduction of selectivity and blocking requirements for UL intra-band CA | Ericsson | - |
R4‑147598 | TP for TR 36.833-4: remaining RF RX requirements for UL intra-band CA | Ericsson | - |
R4‑147599 | Introduction of selectivity and blocking requirements for UL inter-band CA | Ericsson | - |
R4‑147600 | TP for TR 36.851: coexistence studies and UE requirements for CA_7-12 | Ericsson | - |
R4‑147601 | Introduction of additional band combinations for 3DL inter-band CA | - | - |
R4‑147602 | Band 1 performance for UEs supporting inter-band combinations with Band 1 and the 2GHz LTE band in Region 1 | Ericsson, Sony Mobile | - |
R4‑147603 | 3.5GHz out of band blocking | Ericsson | - |
R4‑147604 | Band 42, 43 A-MPR simulations for single carrier and CA | Ericsson | - |
R4‑147605 | Band 28 and NS_24 | Ericsson, TeliaSonera, Motorola Solutions, Telefni | - |
R4‑147606 | Band 28 and NS_24 | Ericsson, TeliaSonera, Motorola Solutions, Telefni | - |
R4‑147607 | LS on transition period to test Band 26 and Band 28 NS | Ericsson | - |
R4‑147608 | Possible UE architectures to keep B1 performance | Ericsson | - |
R4‑147609 | TP to Extended AWS band TR: Conclusions of the SI and recommend the new option | Ericsson | - |
R4‑147610 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑147611 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑147612 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑147613 | Response LS on DL fallback modes | Ericsson | - |
R4‑147614 | Draft WID on LTE Advanced 3 Band Carrier Aggregation (3DL) of Band 3, Band 7 and Band 28 | Ericsson | - |
R4‑147615 | Draft WID on Bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 7 | Ericsson | - |
R4‑147616 | Draft WID on LTE Advanced 3 Band Carrier Aggregation (3DL) of Band 7, Band 7 and Band 28 | Ericsson | - |
R4‑147617 | Band 31 co-existence in Europe | Ericsson | - |
R4‑147618 | Future CA WI naming, WI acronym, TR handling and WID content | Ericsson | - |
R4‑147619 | Clarifications on support for fall-back mode | Ericsson | - |
R4‑147620 | CA fallback support in 36.101 | Ericsson, Nokia Corporation, Intel | - |
R4‑147621 | On definition of EIS level as part of AAS BS OTA sensitivity requirement | Ericsson | - |
R4‑147622 | On AAS base station sensitivity requirements for large N | Ericsson | - |
R4‑147623 | On OTA sensitivity requirement in specification | Ericsson | - |
R4‑147624 | TP for TR 37.842: Adding text to section 8.1.5.2 | Ericsson | - |
R4‑147625 | On how to test EIS in the context of OTA sensitivity requirement definition | Ericsson | - |
R4‑147626 | Measurement technique and uncertainties | Ericsson | - |
R4‑147627 | TP for TR 37.842: Update of text in section 3 | Ericsson | - |
R4‑147628 | TP for TR 37.842: Update of text in section 7.2 | Ericsson | - |
R4‑147629 | OTA sensitivity requirement principles | Ericsson | - |
R4‑147630 | EIRP requirement principles | Ericsson | - |
R4‑147631 | TP for 37.842: Update of text in section 7.1 handling EIRP | Ericsson | - |
R4‑147632 | IMD requirement capturing cross transceiver coupling | Ericsson | - |
R4‑147633 | Scaling factor for unwanted and spurious emissions | Ericsson | - |
R4‑147634 | Other conducted requirements | Ericsson | - |
R4‑147635 | AAS specification structure | Ericsson | - |
R4‑147636 | Example AAS SR and MSR requirements implementation in a single AAS spec | Ericsson | - |
R4‑147637 | Other examples of AAS specification structures | Ericsson | - |
R4‑147638 | Effects of Intra Array Coupling in AAS Base Stations | Ericsson | - |
R4‑147639 | Introduction of multi-carrier and multi-band BS testing in TS 25.141 - clauses 1-5 | Ericsson | - |
R4‑147640 | Introduction of multi-carrier and multi-band BS testing in TS 25.141 - clauses 6-7 | Ericsson | - |
R4‑147641 | Introduction of multi-carrier multi-band BS testing in TS 25.141 - clauses 1-5 | Ericsson, Nokia Networks, Alcatel-Lucent, ZTE | - |
R4‑147642 | Introduction of multi-carrier and multi-band BS testing in TS 25.141 - clauses 6-7 | Ericsson, Nokia Networks, Alcatel-Lucent, ZTE | - |
R4‑147643 | Introduction of multi-carrier and multi-band BS testing in TS 25.141 Discussion and clarifications | Ericsson | - |
R4‑147644 | Heterogeneous Network Enhancements Impact on BS Performance Requirements | Ericsson | - |
R4‑147645 | TP for AAS Specification Organization | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE | - |
R4‑147646 | Update on Impairment Results | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑147647 | REFSENS requirements for LC-MTC | Nokia Networks, Nokia Corporation | - |
R4‑147648 | Discussion on RLM requirements for Rel-12 MTC UE | Nokia Networks, Nokia Corporation | - |
R4‑147649 | 36.133 CR on UE behavior after measurement gap for FDD/TDD CA | Nokia Networks, Nokia Corporation | - |
R4‑147650 | 36.133 CR on UE behavior after measurement gap with mutiple TAGs | Nokia Networks, Nokia Corporation | - |
R4‑147651 | Band 31 specification update | Orange | - |
R4‑147652 | CR to TS36.101: Band 31 update | Orange | - |
R4‑147653 | TR 37.842 version 1.2.0 | Huawei | - |
R4‑147654 | Specification Skeleton | Huawei | - |
R4‑147655 | Specification organization | Huawei | - |
R4‑147656 | Clarification on the conducted sensitivity and the number of receivers | Huawei | - |
R4‑147657 | Way forward for AAS WI | Huawei | - |
R4‑147658 | Further discussion on EIRP accuracy accuracy at steering angles. | Huawei | - |
R4‑147659 | Further discussion on EIRP accuracy statistical results and sample size of +/- 2dB accuracy of non AAS BS | Huawei | - |
R4‑147660 | TP: EIRP accuracy | Huawei | - |
R4‑147661 | Discussion on FFS conducted requirements | Huawei | - |
R4‑147662 | Further discussion on UEM and definition of N | Huawei | - |
R4‑147663 | TP: UEM | Huawei | - |
R4‑147664 | Further discussion on manufactures declarations | Huawei | - |
R4‑147665 | TP: Manufacture declarations | Huawei | - |
R4‑147666 | Further discussion on inter-modulations intra AAS coupling | Huawei | - |
R4‑147667 | TP: inter-modulation requirements intra AAS coupling | Huawei | - |
R4‑147668 | Intra array coupling leakage estimation | Huawei | - |
R4‑147669 | TP to introduce new terms | Huawei | - |
R4‑147670 | Discussion on FOM for OTA sensitivity | Huawei | - |
R4‑147671 | Discussion on directivity estimate for minimum OTA sensitivity requirement | Huawei | - |
R4‑147672 | TP: OTA sensitivity | Huawei | - |
R4‑147673 | OTA sensitivity testing example | Huawei | - |
R4‑147674 | A-MPR Study for B42/B43 UE Co-existence | MediaTek Inc. | - |
R4‑147675 | MSD for B42 in class A2 CA B3_B42 | MediaTek Inc. | - |
R4‑147676 | TP for TR36.851: UE Low-band receiver harmonic mixing problem for CA_B26_B41 | MediaTek Inc. | - |
R4‑147677 | TP for TR36.8xx: UE Low-band receiver harmonic mixing problem for CA_B20_B40 | MediaTek Inc. | - |
R4‑147678 | MSD test configurations for 2UL CA_B1_B3 and CA_B1_B8 | MediaTek Inc. | - |
R4‑147679 | MSD for 2UL CA_B1_B3 and CA_B1_B8 | MediaTek Inc. | - |
R4‑147680 | Simulation results for assessing IL impact | Huawei | - |
R4‑147681 | Simulation Results for D2D Co-existence | Alcatel-Lucent | - |
R4‑147682 | REFSENS analysis for B1+B28 | Intel | - |
R4‑147683 | REFSENS analysis for B3+B42 | Intel | - |
R4‑147684 | Introduction of CA_5-13 into 36.101 | Intel Corporation, Verizon Wireless | - |
R4‑147685 | A-MPR for Band 42 and Band 43 UE-UE coexistence | Intel | - |
R4‑147686 | A-MPR for Band 41 based on revised OOBE requirements | Intel | - |
R4‑147687 | LC-MTC PDSCH demodulation test simulation results | Intel | - |
R4‑147688 | LC-MTC PHICH and PBCH demodulation test simulation results | Intel | - |
R4‑147689 | TP to TS 37.144 on adding UTRA FDD notebook TRP/TRS requirements for Bands I and VIII | Intel, Sony Mobile Communications Japan, Inc., Nok | - |
R4‑147690 | Updated analysis of UTRA FDD handset BHH TRP/TRS data in Bands I and VIII | Intel | - |
R4‑147691 | TP to TS 37.144 on adding UTRA FDD handset BHH TRP/TRS requirements for Bands I and VIII | Intel | - |
R4‑147692 | New WID: Performance requirements for the verification of radiated multi-antenna reception performance of UEs | Intel | - |
R4‑147693 | LTE TDD eIMTA PDSCH demodulation requirements | Intel | - |
R4‑147694 | LTE TDD eIMTA CSI reporting requirements | Intel | - |
R4‑147695 | LTE TDD eIMTA EPDCCH demodulation requirements | Intel | - |
R4‑147696 | NAICS demodulation test purposes and scenarios | Intel | - |
R4‑147697 | NAICS reference receiver structures and assumptions | Intel | - |
R4‑147698 | Dominant interferer selection for NAICS receivers | Intel | - |
R4‑147699 | NAICS performance analysis for TM2 scenarios | Intel | - |
R4‑147700 | Views on NAICS CSI reporting | Intel | - |
R4‑147701 | [Draft] Reply LS to RAN3 on Rel-12 NAICS | Intel | - |
R4‑147702 | D2D demodulation requirements | Intel | - |
R4‑147703 | Link level simulation results for cell identification of LC-MTC | Intel | - |
R4‑147704 | Further discussion on PSCell activation in dual connectivity | Intel | - |
R4‑147705 | Interruption requirement in Dual connectivity | Intel | - |
R4‑147706 | Further discussion on the measurement requirements with DRX in DC | Intel | - |
R4‑147707 | D2D synchronization requirements | Intel | - |
R4‑147708 | Discussion on interruption requirements for D2D | Intel | - |
R4‑147709 | Discussion on the remaining RRM issues for SCE | Intel | - |
R4‑147710 | Discussion on the remaining issues for IncMon | Intel | - |
R4‑147711 | Further discussion on positioning enhancement for HetNet scenarios | Intel | - |
R4‑147712 | New study item proposal on measurement gap enhancement | Intel | - |
R4‑147713 | Motivation paper for new study item proposal on measurement gap enhancement in Rel-13 | Intel | - |
R4‑147714 | Discussion on 256QAM demodulation test | Intel | - |
R4‑147715 | Discussion on 256QAM CSI test | Intel | - |
R4‑147716 | Discussion on test requirement PUSCH 3-2 test | Intel | - |
R4‑147717 | Discussion on SU-MIMO multi-cell whitening test | Intel | - |
R4‑147718 | Further Analysis of MSD for CA Class A2 architectures | Motorola Mobility | - |
R4‑147719 | On statement the exclusion of multi band transceivers supporting TDD and FDD simultaneously in the release 12 BS specifications. | Huawei | - |
R4‑147720 | Introduction of statement defining that TS36.104 does not apply to multi band transceivers supporting TDD and FDD simultaneously. | Huawei | - |
R4‑147721 | Introduction of statement defining that TS36.141 does not apply to multi band transceivers supporting TDD and FDD simultaneously. | Huawei | - |
R4‑147722 | Introduction of statement defining that TS37.104 does not apply to multi band transceivers supporting TDD and FDD simultaneously. | Huawei | - |
R4‑147723 | Introduction of statement defining that TS37.141 does not apply to multi band transceivers supporting TDD and FDD simultaneously. | Huawei | - |
R4‑147724 | Introducing 2DL/1UL CA B2+B28 in TS36.101 | Huawei | - |
R4‑147725 | Introducing 2DL/1UL CA B2+B28 in TS36.104 | Huawei | - |
R4‑147726 | Introducing 2DL/1UL CA B2+B28 in TS36.141 | Huawei | - |
R4‑147727 | Introducing 2DL/1UL CA B2+B28in TS36.307 | Huawei | - |
R4‑147728 | TP for Rel-13 2DL TR 36.8xx: New TIB and RIB plus B4 MSD in LTE_CA_B4_B28 | Huawei | - |
R4‑147729 | TP for Rel-13 2DL TR 36.8xx: B4 MSD in LTE_CA_B4_B28 | Huawei | - |
R4‑147730 | On the definitions of MC BS, MSR and MB BS | Huawei | - |
R4‑147731 | Power definitions in BS specifications | Huawei | - |
R4‑147732 | On LTE CA documentation | Qualcomm Incorportated | - |
R4‑147733 | LS on new CA combination WIDs | Qualcomm Incorportated | - |
R4‑147734 | More on 3.5 GHz out-of-band blocking | Qualcomm Incorporated | - |
R4‑147735 | 3.5 GHz out-of-band blocking | Qualcomm Incorporated, Huawei, Hisiilcion, Intel C | - |
R4‑147736 | 3.5 GHz out-of-band blocking | Qualcomm Incorporated, Huawei, Hisiilcion, Intel C | - |
R4‑147737 | 3.5 GHz out-of-band blocking | Qualcomm Incorporated, Huawei, Hisiilcion, Intel C | - |
R4‑147738 | Band 41 A-MPR simulations | Qualcomm Incorporated | - |
R4‑147739 | NS signaling and regulatory requirements | Qualcomm Incorporated | - |
R4‑147740 | Band 42/43 A-MPR simulations | Qualcomm Incorporated | - |
R4‑147741 | Band 3 and Band 42 A2 combination | Qualcomm Incorporated | - |
R4‑147742 | Way forward for A2 inter-band CA combinations | Qualcomm Incorporated | - |
R4‑147743 | Impact of harmonic trap filter to 3DL CA combinations | Qualcomm Incorporated, Nokia Corporation, Intel Co | - |
R4‑147744 | A signaling proposal for 2UL GNSS inteference mitigation | Qualcomm Incorporated | - |
R4‑147745 | LS on enhanced signalling to protect GNSS reception for UL CA | Qualcomm Incorporated | - |
R4‑147746 | 2 GHz MSS band UE considerations | Qualcomm Incorporated | - |
R4‑147747 | AWS-3 band plan considerations | Qualcomm Incorporated | - |
R4‑147748 | TR 36.849 v0.1.0 Study on AWS-Extension Band for LTE | Qualcomm Incorporated | - |
R4‑147749 | Band 31 usage in Europe | Qualcomm Incorporated | - |
R4‑147750 | On UE demodulation test setup for NAICS | Qualcomm Incorporated | - |
R4‑147751 | Link level evaluations for NAICS UE demodulation | Qualcomm Incorporated | - |
R4‑147752 | MTC Way Forward | Vodafone | - |
R4‑147753 | WF on Pcell clarification | Vodafone | - |
R4‑147754 | On harmonic trap filter when no agreement due to uncertainty in specific operator spectrum arrangement | Vodafone | - |
R4‑147755 | Band 7+8 reference sensitivity and TP to 36.851 | Vodafone | - |
R4‑147756 | TP to 36.853 to add B7 and B8 to CA_7+8+20 | Vodafone | - |
R4‑147757 | UL CA GNSS protection | Vodafone | - |
R4‑147758 | LEE TRP requirements | Vodafone | - |
R4‑147759 | LEE TRS requirements | Vodafone | - |
R4‑147760 | Low Cost MTC reference sensitivity and TP to Low Cost MTC TR | Vodafone | - |
R4‑147761 | CR Correction on fallback note | Vodafone | - |
R4‑147762 | New WID Proposal LTE CA_B1-B3-B28 | Vodafone | - |
R4‑147763 | New WID Proposal LTE CA_B3-B7-B28 | Vodafone | - |
R4‑147764 | New WID Proposal LTE CA_B3C-B5 | Vodafone | - |
R4‑147765 | New WID Proposal LTE CA_B7-B20-B38 | Vodafone | - |
R4‑147766 | On LTE CA documentation | Qualcomm Incorporated | - |
R4‑147767 | Discussion on 2UL CA Closing in Release 12 | LG Uplus | - |
R4‑147768 | Correction on transmitter intermodulation requirement related to multi-band operation | CATT, ZTE | - |
R4‑147769 | Correction on transmitter intermodulation requirement related to multi-band operation | CATT, ZTE | - |
R4‑147770 | TS25.101 removal of brackets | Motorola Solutions | - |
R4‑147771 | TS25.101 removal of brackets | Motorola Solutions | - |
R4‑147772 | TS25.101 removal of brackets | Motorola Solutions | - |
R4‑147773 | TS36.101 removal of brackets | Motorola Solutions | - |
R4‑147774 | TS36.101 removal of brackets | Motorola Solutions | - |
R4‑147775 | TS36.101 removal of brackets | Motorola Solutions | - |
R4‑147776 | B31 deployment in Region 1 | Motorola Solutions | - |
R4‑147777 | CR for TR 36.104: LTE_CA_B5_B13 | Alcatel-Lucent, Verizon | - |
R4‑147778 | CR for TR 36.141: LTE_CA_B5_B13 | Alcatel-Lucent, Verizon | - |
R4‑147779 | CR for TR 36.307: LTE_CA_B5_B13 | Alcatel-Lucent, Verizon | - |
R4‑147780 | CR for TR 36.307: LTE_CA_B5_B13 | Alcatel-Lucent, Verizon | - |
R4‑147781 | CR for TR 36.307: LTE_CA_B5_B13 | Alcatel-Lucent, Verizon | - |
R4‑147782 | Correction to Transmit Modulation Quality for CA | Rohde & Schwarz | - |
R4‑147783 | Removal of brackets and TBD from CA feature _rel 10 | Nokia Corporation | - |
R4‑147784 | Removal of brackets and TBD from CA feature_ rel 11 | Nokia Corporation | - |
R4‑147785 | Removal of brackets and TBD from CA feature_ re 12 | Nokia Corporation | - |
R4‑147786 | Corrections and Clarifications of UE specifications in TR 36.844 | Lightsquared | - |
R4‑147787 | UE Receive Specifications in TR 36.844 | Lightsquared | - |
R4‑147788 | RDD Analysis for FS_LTE_FDD_1670_US | Lightsquared | - |
R4‑147789 | Corrections and Clarifications of eNB specifications in TR 36.844 | Lightsquared | - |
R4‑147790 | On CA WI naming, WI acronym, TR handling and WID content | Nokia Corporation | - |
R4‑147791 | Corrections to E-UTRAN TDD RLM In-sync under Time Domain Measurement Resource Restriction with CRS assistance information | ZTE, Anritsu | - |
R4‑147792 | Corrections to E-UTRAN TDD RLM In-sync under Time Domain Measurement Resource Restriction with CRS assistance information | ZTE, Anritsu | - |
R4‑147793 | Corrections to E-UTRAN TDD RLM Out-of-sync under Time Domain Measurement Resource Restriction with CRS Assistance Information | ZTE, Anritsu | - |
R4‑147794 | Corrections to E-UTRAN TDD RLM Out-of-sync under Time Domain Measurement Resource Restriction with CRS Assistance Information | ZTE, Anritsu | - |
R4‑147795 | New Work Item Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 7, Band 40 and Band 40 | CMCC | - |
R4‑147796 | Reply LS on introducing the EVS codec in MTSI (C1-144148 Source: TSG CT WG1, To: TSG SA WG4, Cc: TSG CT WG3,TSG CT WG4,TSG SA WG2,TSG RAN WG1,TSG RAN WG2,TSG RAN WG4) | TSG CT WG1 | - |
R4‑147797 | LS on soft-combining of discovery messages within a discovery period (R1-144523 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147798 | LS on soft buffer management for D2D communications (R1-144524 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147799 | LS on D2D Synchronization (R1-144527 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147800 | LS on updated LTE Rel-12 UE feature list (R1-144535 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: TSG RAN WG3) | TSG RAN WG1 | - |
R4‑147801 | LS on ProSe Lawful Interception – In Network Coverage (SA3LI14_177r2_LS-ProSe Source: TSG SA WG3LI, To: TSG RAN WG1,TSG RAN WG2,TSG RAN WG3, Cc: TSG RAN WG4) | TSG SA WG3LI | - |
R4‑147802 | OTA PERFORMANCE LIMIT FOR CELLULAR PHONES WITH HEAD&HAND PHANTOMS (CCSA TC9 WG1 LS to 3GPP RAN4_SV(2) Source: CCSA, To: TSG RAN WG4, Cc: ) | CCSA | - |
R4‑147803 | LS on TP on SCE for 36.300 (R1-144540 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑147804 | LS on handling of collisions between PRS and DRS (R1-144541 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: TSG RAN WG2) | TSG RAN WG1 | - |
R4‑147805 | LS reply on DRS measurements (R1-144542 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147806 | LS on D2D Multicarrier Transmitter Capabilities (R1-144543 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147807 | Pcmax definition for Dual Connectivity | InterDigital | - |
R4‑147808 | New UTRA TRP and TRS measurements for band I with head+hands test setup | Telecom Italia | - |
R4‑147809 | LS on pre-configured parameters for D2D | Qualcomm Incorporated | - |
R4‑147810 | Introduction of power imbalance requirement into 36.101 | NTT DOCOMO, INC. | - |
R4‑147811 | Handling of 256QAM capability | NTT DOCOMO, INC. | - |
R4‑147812 | Reply LS on 256QAM | Huawei, Hisilicon | - |
R4‑147813 | LS on pre-configured parameters for D2D | Qualcomm Incorporated | - |
R4‑147814 | Dependency on inter-band CA configurations with 2UL for dual connectivity configurations | Ericsson | - |
R4‑147815 | summary of simulation results for 256QAM demodulation test | Qualcomm | - |
R4‑147816 | Simulation results for FDD | Ericsson | - |
R4‑147817 | Non Ideal backhaul | Ericsson | - |
R4‑147818 | WF on 256QAM demodulation and CSI tests | Huawei | - |
R4‑147819 | LS response on the structure of the discovery reference signal for small cell discovery | Ericsson | - |
R4‑147820 | Reply LS on DRS based measurements | Huawei,HiSilicon | - |
R4‑147821 | Performance requirements for PUSCH with TTI bundling and enhanced HARQ pattern | China Telecom, ZTE, Huawei, Samsung, Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑147822 | Test requirements for PUSCH with TTI bundling and enhanced HARQ pattern | China Telecom, ZTE, Huawei, Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑147823 | WF on channel bandwidth for UL-COV conformance test | China Telecom, ZTE, Huawei | - |
R4‑147824 | CR of reference measurement channel for PUSCH3-2 test | ZTE | - |
R4‑147825 | Discussion on 256QAM demodulation test | ZTE | - |
R4‑147826 | Correction to RSTD Intra Frequency Delay Test Case | Samsung | - |
R4‑147827 | Correction to RSTD Inter Frequency Accuracy Test Case | Samsung | - |
R4‑147828 | Correction to RSTD Intra Frequency Accuracy Test Case | Samsung | - |
R4‑147829 | UE Behaviour after Measurement Gap in CA | Ericsson, CATT, Nokia Networks, Nokia Corporation, ALU | - |
R4‑147830 | CR to remove CA capability column in CA performance test tables (Rel-10) | Qualcomm Incorporated | - |
R4‑147831 | PCell Interruption in Rel-12 CA | Ericsson, Nokia Networks, Nokia Corporation, Qualcomm Incorporated | - |
R4‑147832 | Introduction of UE requirements for PCell interruptions (Rel-11) | Nokia Networks, Nokia Corporation, Ericsson, Qualcomm Incorporated | - |
R4‑147833 | Test case for inter-RAT HO to multicarrier UTRA | Ericsson | - |
R4‑147834 | Introduction of minimum requirements for intra-band NC CA with timing offset | Nokia Corporation, Nokia Networks, DoCoMo, Qualcomm, Ericsson | - |
R4‑147835 | CA RRM Testing for Fall back CA Configuration | Ericsson, Qualcomm Incorporate, CMCC | - |
R4‑147836 | Test Case List for RRM Tests for 3 DL CA | Ericsson | - |
R4‑147837 | Initial simulation results for eIMTA PDSCH test. | LG Electronics | - |
R4‑147838 | Draft LS to RAN3 on NAICS Signaling Granularity | Qualcomm | - |
R4‑147839 | Feasibility of positioning enhancements for E-UTRA TR 36.855 v0.7.0 | Huawei,HiSilicon | - |
R4‑147840 | WF on E-CID accuracy requirements methodology | Huawei | - |
R4‑147841 | Ad hoc minutes for SCE | Huawei | - |
R4‑147842 | CR for CA applicability rule in 36.101 in Rel-10 | Ericsson, Qualcomm, Huawei, HiSilicon | - |
R4‑147843 | CR for CA applicability rule in 36.101 in Rel-11 | Ericsson, Qualcomm, Huawei, HiSilicon | - |
R4‑147844 | CR for CA applicability rule in 36.101 in Rel-12 | Ericsson, Qualcomm, Huawei, HiSilicon | - |
R4‑147845 | NAICS demodulation test purposes and scenarios | Intel | - |
R4‑147846 | Discussion on multi-cell whitening verification test | LG Electronics | - |
R4‑147847 | Simulation results for PUSCH 3-2 tests | ALU, ALU shanghai bell | - |
R4‑147848 | Minutes for NAICS Capability Discussion | Mediatek | - |
R4‑147849 | TP on TR36.855 eCID enhancement in non-collocated serving cell scenarios | Huawei,HiSilicon | - |
R4‑147850 | Introducing requirements for small cell enhancement in TS36.133 | Huawei,HiSilicon | - |
R4‑147851 | Intra-frequency and inter-frequency measurement accuracy requirements with DMTC | Ericsson, ZTE | - |
R4‑147852 | Introduction of RSRP measurement accuracy requirement for DRS based measurement | ZTE, Huawei, LGE | - |
R4‑147853 | Introduction of RRM requirements for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147854 | Reply LS on RRM measurement for DC | NTT Docomo | - |
R4‑147855 | CR: DC UE performance requirements | Huawei, HiSilicon | - |
R4‑147856 | CR to remove CA capability column in CA performance test tables (Rel-11) | Qualcomm Incorporated | - |
R4‑147857 | CR to remove CA capability column in CA performance test tables (Rel-12) | Qualcomm Incorporated | - |
R4‑147858 | WF on D2D UE behavior for UE Rx-Tx measurements | Ericsson | - |
R4‑147859 | WF on Low Cost MTC Demod and CSI tests | Ericsson | - |
R4‑147860 | Introduction of PUSCH 3-2 requirements into TS36.101 | Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, | - |
R4‑147861 | Introducing test case for TDD-TDD Inter-frequency event triggered reporting for TDD UL/DL configuration 0 | Huawei, HiSilicon, | - |
R4‑147862 | LS to RAN2 on NAICS signaling | Mediatek | - |
R4‑147863 | LS on Rel-12 NAICS CA Capability | Mediatek | - |
R4‑147864 | Scope for BS performance test requirements for TDD-FDD CA | Ericsson, NTT DOCOMO | - |
R4‑147865 | CA RRM Testing for Multiple Duplex Modes | Ericsson, CMCC | - |
R4‑147866 | Requirements for increased carrier monitoring in idle mode 25.133 | Ericsson, Intel, Nokia Networks, Noka Corporation, Qualcomm, Samsung | - |
R4‑147867 | Requirements for increased carrier monitoring in cell FACH and cell DCH state 25.133 | Ericsson, Intel, Nokia Networks, Noka Corporation, Qualcomm, Samsung | - |
R4‑147868 | CR on RRM requirement for D2D | Qualcomm Incorporated | - |
R4‑147869 | Minutes for the DC ad hoc | Huawei | - |
R4‑147870 | LS on measurements for MBMS support | Qualcomm Incorporated | - |
R4‑147871 | MBMS requirements in section 4 | Ericsson | - |
R4‑147872 | CR on measurement for MBSFN MDT | Nokia Network, Nokia Corporation, Qualcomm, CATT, Ericsson, ALU | - |
R4‑147873 | MBMS requirements in section 9 | Ericsson | - |
R4‑147874 | CR on parallel reporting criteria for eMBMS | Ericsson, Alcatel-Lucent | - |
R4‑147875 | Measurement and reporting of BLER in section 9 | CATT | - |
R4‑147876 | Introducing interruption requirements for dual connectivity into TS36.133 | Huawei,HiSilicon | - |
R4‑147877 | Introduction of measurement requirements for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑147878 | LS on Rel-12 NAICS 4CRS AP Capability | Mediatek | - |
R4‑147879 | Summary of single cell demodulation alignment and impairment results | Huawei, HiSilicon | - |
R4‑147880 | WF on SU-MIMO rank test | Ericsson | - |
R4‑147881 | WF on SU-MIMO demod and CSI requirements | Huawei | - |
R4‑147882 | Minutes for the IncMon ad hoc | Ericsson | - |
R4‑147883 | WF on simulation assumptions for D2D REFSENS demodulation | Qualcomm | - |
R4‑147884 | WF on D2D demodulation test scope and work plan | Qualcomm | - |
R4‑147885 | 25.101 CR on new reference measurement channels due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147886 | 25.101 CR on performance requirements for UE DCH demodulation during handover due to introduction of DCH enhancements | Qualcomm Inc. | - |
R4‑147887 | 25.101 CR on performance requirements for downlink power control due to introduction of DCH enhancements | Qualcomm Incorporated | - |
R4‑147888 | 25.101 CR on performance requirements for UE DCH demodulation in static and multipath fading conditions due to introduction of DCH enhancements | Qualcomm Inc. | - |
R4‑147889 | 25.101 CR on E-AGCH performance requirements with TDM granting | Qualcomm Inc., Nokia Networks, Ericsson | - |
R4‑147890 | RRM test case for cell identification in DRX | Ericsson | - |
R4‑147891 | CR on normal demodulation test for 3DL CA | CMCC | - |
R4‑147892 | CR on normal demodulation test for TDD-FDD CA | CMCC | - |
R4‑147893 | WF on CA performance requirements | CMCC | - |
R4‑147894 | CR to specify applicability of CoMP RI test (Rel-11) | Qualcomm Incorporated, Anritsu | - |
R4‑147895 | Summary of eIMTA demodulation results | Huawei, HiSilicon | - |
R4‑147896 | Way forward for eIMTA PDSCH demodulation test | Intel | - |
R4‑147897 | Way forward for eIMTA CSI test | Ericsson | - |
R4‑147898 | CR to introduce CQI test for 3 DL CA | Qualcomm Incorporated | - |
R4‑147899 | CR on sustained data rate test for 3DL CA | Huawei, HiSilicon | - |
R4‑147900 | CR on normal demodulation test for 3DL CA | CMCC, Ericssion, Huawei, HiSilicon, | - |
R4‑147901 | Introduction of High Doppler measurement accuracy requierments | Ericsson, CATT | - |
R4‑147902 | Different TDD configurations in CA | Ericsson, Huawei, HiSilicon | - |
R4‑147903 | TDD RSRQ for E-UTRAN Carrier Aggregation for 20MHz+10MHz | Huawei, HiSilicon, CMCC | - |
R4‑147904 | Ecat clarification for iRAT | Nokia Corporation, Nokia Networks, Ericsson | - |
R4‑147905 | Introduction of TDD-FDD CA test cases | Nokia Networks, Nokia Corporation, Huawei, HiSilicon, Ericsson | - |
R4‑147906 | Meeting minutes for NAICS ad hoc | Mediatek | - |
R4‑147907 | Way forward for eIMTA ePDCCH test | CATT | - |
R4‑147908 | MBMS requirements in section 7 | Ericsson | - |
R4‑147909 | TP for TR 36.855: Solutions for OTDOA with RRH | Ericsson | - |
R4‑147910 | TP for 36.855: Solutions for E-CID with RRH | Ericsson | - |
R4‑147911 | Smaller and larger BW accuracy for E-CID | Ericsson | - |
R4‑147912 | Updated test cases and simulation assumptions for SCE demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑147913 | Requirements for increased carrier monitoring for idle mode 36.133 | Ericsson, CATT, Intel, Nokia Networks, Noka Corporation, Qualcomm, Samsung | - |
R4‑147914 | Requirements for increased carrier monitoring in RRC connected state 36.133 | Ericsson, Intel, Nokia Networks, Noka Corporation, Qualcomm, Samsung | - |
R4‑147915 | Future CA WI naming, WI acronym, TR handling and WID content | Ericsson, Nokia Corporation | - |
R4‑147916 | TS25.101 removal of brackets (RF) | Motorola Solutions | - |
R4‑147917 | TS25.101 removal of brackets (RF) | Motorola Solutions | - |
R4‑147918 | TS25.101 removal of brackets (RF) | Motorola Solutions | - |
R4‑147919 | TS36.101 removal of brackets (RF) | Motorola Solutions | - |
R4‑147920 | TS36.101 removal of brackets (RF) | Motorola Solutions | - |
R4‑147921 | Removal of brackets and TBD from CA feature_ re 12 | Nokia Corporation | - |
R4‑147922 | Correction to Transmit Modulation Quality for CA | Rohde & Schwarz | - |
R4‑147923 | Correction to Transmit Modulation Quality for CA | Rohde & Schwarz | - |
R4‑147924 | DRAFT Reply LS on NS values in system information broadcast | Nokia Corporation | - |
R4‑147925 | Band 42, 43 A-MPR simulations for single carrier and CA | Ericsson | - |
R4‑147926 | A-MPR for Band 41 based on revised OOBE requirements | Intel | - |
R4‑147927 | B42 and B43 A-MPR simulation results | TeliaSonera | - |
R4‑147928 | WF on Pcell clarification | Vodafone, Telefónica, Deutsche Telekom, Telecom Italia, Orange, KDDI, TeliaSonera, KT, AT&T, Huawei, CMCC | - |
R4‑147929 | Clarification of UL and DL CA configuration | Nokia Networks, Nokia Corporation | - |
R4‑147930 | Clarification of UL and DL CA configuration | Nokia Networks, Nokia Corporation | - |
R4‑147931 | Clarification on UL and DL CA | Nokia Networks, Nokia Corporation | - |
R4‑147932 | Clarification of notes relating to interferer offsets in intrabnd CA receiver requirement tables. | Nokia Corporation | - |
R4‑147933 | Clarification of notes relating to interferer offsets in intraband CA receiver requirement tables. | Nokia Corporation | - |
R4‑147934 | Clarification of notes relating to interferer offsets in intraband CA receiver requirement tables. | Nokia Corporation | - |
R4‑147935 | Ad hoc minutes: BS specification maintenance | Ericsson | - |
R4‑147936 | Introduction of multi-carrier multi-band BS testing in TS 25.141 - clauses 1-5 | Ericsson, Nokia Networks, Alcatel-Lucent, ZTE | - |
R4‑147937 | Introduction of multi-carrier and multi-band BS testing in TS 25.141 - clauses 6-7 | Ericsson, Nokia Networks, Alcatel-Lucent, ZTE | - |
R4‑147938 | Multi-band test configurations corrections | Nokia Networks, Alcatel-Lucent, Ericsson | - |
R4‑147939 | EMC testing of multi-band operation for LTE BS | Ericsson, Nokia Networks | - |
R4‑147940 | AAS WI: Agenda and meeting minutes for Monday evening ad hoc | Huawei | - |
R4‑147941 | EMC testing of multi-band operation for MSR BS | Ericsson, Nokia Networks, Alcatel-Lucent | - |
R4‑147942 | Multi-band test configurations corrections | Nokia Networks | - |
R4‑147943 | CR to Update annex references, add missing tables and do editorial cleanup | TruePosition | - |
R4‑147944 | CR to Update annex references, add missing tables and do editorial cleanup | TruePosition | - |
R4‑147945 | Way forward on NS_12 and NS_13 | Ericsson | - |
R4‑147946 | Band 28 and NS_24 | Ericsson, TeliaSonera, Motorola Solutions, Telefonica, | - |
R4‑147947 | Band 28 and NS_24 | Ericsson, TeliaSonera, Motorola Solutions, Telefni | - |
R4‑147948 | LS on transition period to test Band 28 NS | Ericsson | - |
R4‑147949 | LEE TRP requirements for bands I and VIII | Vodafone | - |
R4‑147950 | Response LS to GCF on OTA Test requirements | Samsung | - |
R4‑147951 | Way forward on Frequency Band Arrangements for 2 GHz LTE Band in Region 1 | Ericsson | - |
R4‑147952 | TP on Dual duplexer RF architecture for New MSS band | LG Electronics | - |
R4‑147953 | Way forward on MSS band and legacy band 1 treatment | KT | - |
R4‑147954 | MTC Way Forward | Vodafone | - |
R4‑147955 | Introduction of LC MTC into TS 36.101 | Huawei, Hisilicon | - |
R4‑147956 | CR for UE requirements for 256QAM | Huawei, Hisilicon | - |
R4‑147957 | Introduction of 256QAM | Nokia Networks, ZTE | - |
R4‑147958 | [Draft] Reply LS on D2D-WAN UE capability | LG Electronics | - |
R4‑147959 | D2D Tx Requirements: Transmit power | Qualcomm Incorporated | - |
R4‑147960 | D2D Tx Requirements: Output power dynamics | Qualcomm Incorporated | - |
R4‑147961 | Way forward on D2D | Ericsson | - |
R4‑147962 | D2D Tx Requirements: Output RF spectrum emissions | Qualcomm Incorporated | - |
R4‑147963 | D2D Tx Requirements: Transmit Intermodulation | Qualcomm Incorporated | - |
R4‑147964 | Impact of D2D on UE Transmit RF Requirements | Ericsson | - |
R4‑147965 | Reference measurement channel for D2D RX requirement | CATT | - |
R4‑147966 | Introduction of Dual Connectivity to TS 36.101 Rel-12, RF part | Ericsson, InterDigital, Huawei, Etisalat | - |
R4‑147967 | D2D Rx on FDD bands: REFSENS | Qualcomm Incorporated | - |
R4‑147968 | D2D Rx on FDD bands: Receiver selectivity to Jammer | Qualcomm Incorporated | - |
R4‑147969 | D2D Rx on FDD bands: Spurious emissions, Rx image | Qualcomm Incorporated | - |
R4‑147970 | D2D Rx Requirements for TDD bands | Qualcomm Incorporated | - |
R4‑147971 | D2D Rx on FDD bands: Impact to WAN | Qualcomm Incorporated | - |
R4‑147972 | TP for TR 36.877: D2D reception next to UL channel | Qualcomm Incorporated | - |
R4‑147973 | Impact of D2D on UE Receive RF Requirements | Ericsson | - |
R4‑147974 | D2D Rx Requirements: Maximum input level | Qualcomm Incorporated | - |
R4‑147975 | Way forward on Rx requirements on 2UL inter-band CA | NTT DOCOMO | - |
R4‑147976 | WF on 2UL inter-band CA protection of GNSS | NTT DOCOMO, INC., Nokia Corporation | - |
R4‑147977 | [DRAFT] LS on 2UL inter-band CA protection of GNSS | NTT DOCOMO, INC. | - |
R4‑147978 | Introduction of dual uplink inter-band CA in TS 36.101 rel-12 | LG Electronics, Nokia Corporation, Intel, Qualcomm, MediaTek, LG Uplus, SK Telecom and Samsung, CMCC, Huawei, HiSilcon | - |
R4‑147979 | Comparison of MSD values and proposal for a requirement | Nokia Corporation | - |
R4‑147980 | WF on range of declaration of EIRP | Huawei | - |
R4‑147981 | LS on additional agreements on small cell discovery (R1-145269 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147982 | Reply LS for Rel-12 NAICS (R1-145270 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑147983 | LS on additional agreements on PRACH on dual connectivity (R1-145347 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑147984 | Reply LS on ProSe Lawful Interception – In Network Coverage (R3-143005 Source: TSG RAN WG3, To: TSG SA WG3LI, Cc: TSG RAN WG2,TSG RAN WG1,TSG RAN WG4) | TSG RAN WG3 | - |
R4‑147985 | WF capturing proposals for EIRP accuracy | Ericsson | - |
R4‑147986 | Discussion on minimum specified OTA sensitivity power level | CATT | - |
R4‑147987 | Way forward on AAS OTA sensitivity | Nokia Networks | - |
R4‑147988 | Correction on transmitter intermodulation requirement | ZTE, Nokia Networks, CATT, Ericsson, Alcatel-Lucent, Tejet | - |
R4‑147989 | Correction on transmitter intermodulation requirement | ZTE, Nokia Networks, CATT, Ericsson, Alcatel-Lucent, Tejet | - |
R4‑147990 | Correction on transmitter intermodulation requirement | ZTE, Tejet | - |
R4‑147991 | TP: UEM | Huawei | - |
R4‑147992 | Way forward on scaling factor for unwanted and spurious emissions | Ericsson | - |
R4‑147993 | WF on IMD for co-location case | NTT Docomo | - |
R4‑147994 | WF on IMD for intra system case | Ericsson | - |
R4‑147995 | TP for TR 36.853: Specific BS RF requirements for LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | Alcatel-Lucent | - |
R4‑147996 | Response LS on DL fallback modes | Ericsson | - |
R4‑147997 | Introduction of additional band combinations for 3DL inter-band CA | - | - |
R4‑147998 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑147999 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑148000 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑148001 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑148002 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑148003 | TP for R13 2DL TR 36.8xx: UE RF requirements for 5+29 | Huawei, Hisilicon | - |
R4‑148004 | Band 7+8 reference sensitivity and TP to 36.851 | Vodafone | - |
R4‑148005 | TP for TR 36.851: coexistence studies and UE requirements for CA_7-12 | Ericsson | - |
R4‑148006 | Text proposal for TR 36.849: Conclusions for AWS-Extension Band for LTE | DISH Network | - |
R4‑148007 | Text Proposal for Rel-13 2DL TR 36.8xx: coexistence study for TDD-FDD CA for B8+B41 | CMCC | - |
R4‑148008 | TP for Rel-13 2DLTR 36.8xx: Harmonics and intermodulation analysis of TDD-FDD CA for B20+B40 combination (CA_20A-40A) | Ericsson | - |
R4‑148009 | TP for Rel-13 3DL TR36.8xx TDD-FDD CA for CA_26A-41C | Samsung | - |
R4‑148010 | TP for TR36.851 LTE Advanced Carrier Aggregation of Band Combination (19+42) | NTT DOCOMO, INC. | - |
R4‑148011 | Minutes of Extended AWS Ad-Hoc | Qualcomm Incorportated | - |
R4‑148012 | LS on D2D Synchronization Procedure (R1-145298 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑148013 | LS on Maximum Number of Sidelink Processes and Maximum Transport Block Size (R1-145294 Source: TSG RAN WG1, Ericsson, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1, Ericsson | - |
R4‑148014 | LS on updated LTE Rel-12 UE feature list (R1-145287 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG3 and RAN 4) | TSG RAN WG1 | - |
R4‑148015 | TP for TR36.851: MSD proposal on CA_B1_B28 | KDDI | - |
R4‑148016 | Introduction of inter-band CA_1-28 into TS36.101 | KDDI | - |
R4‑148017 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑148018 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑148019 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑148020 | Reply LS on: Incomplete requirements for Band 28, 42 and 43 | TeliaSonera | - |
R4‑148021 | UMTS HetNet Enhancements impact on cubic metric (MPR) | Ericsson, Qualcomm, Huawei | - |
R4‑148022 | CR on RF requirements for 256QAM | Ericsson, Nokia Networks | - |
R4‑148023 | Way forward on Band 31 coexistence in Europe | Orange | - |
R4‑148024 | UE CA issues Ad-Hoc Minutes | Nokia Corporation | - |
R4‑148025 | New capability set for excluding GSM single-RAT operation | Ericsson, Nokia Networks | - |
R4‑148026 | Correction on transmitter intermodulation requirement related to multi-band operation | CATT, ZTE | - |
R4‑148027 | Clarification of Capability Set per band | Ericsson | - |
R4‑148028 | Tx intermodulation corrections | Nokia Networks, ZTE, Ericsson | - |
R4‑148029 | Tx intermodulation corrections | Nokia Networks, ZTE, Ericsson | - |
R4‑148030 | A-MPR simulation results for Band 41 new FCC requirement | Nokia Corporation | - |
R4‑148031 | TP for TR 37.842: Update of text in section 7.2 | Ericsson | - |
R4‑148032 | TP to Extended AWS band TR: Conclusions of the SI and recommend the new option | Ericsson | - |
R4‑148033 | EMC testing of multi-band operation for MSR BS | Ericsson, Nokia Networks, Alcatel-Lucent | - |
R4‑148034 | Correction to Note 2 of Harmonic Signal Exceptions in Spurious Emissions | Nokia Corporation, Microsoft Corporation, Ericsson, Anritsu, R&S | - |
R4‑148035 | Correction to Note 2 of Harmonic Signal Exceptions in Spurious Emissions | Nokia Corporation, Microsoft Corporation, Ericsson, Anritsu, R&S | - |
R4‑148036 | Correction to Note 2 of Harmonic Signal Exceptions in Spurious Emissions | Nokia Corporation, Microsoft Corporation, Ericsson, Anritsu, R&S | - |
R4‑148037 | Removal of brackets and TBD from CA feature | Nokia Corporation | - |
R4‑148038 | Removal of brackets and TBD from CA feature | Nokia Corporation | - |
R4‑148039 | Removal of brackets and TBD from CA feature | Nokia Corporation | - |
R4‑148040 | Removal of bracket for UL MIMO | Huawei, Hisilicon | - |
R4‑148041 | LS on updated LTE Rel-12 D2D UE feature list (R1-145301 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG3 and RAN 4) | TSG RAN WG1 | - |
R4‑148042 | Multi-band test configurations corrections | Nokia Networks | - |
R4‑148043 | TP on Dual duplexer RF architecture for New MSS band | LG Electronics | - |
R4‑148044 | WF on 256QAM capability | NTT DOCOMO, INC., Orange, Vodafone, T-mobile USA, Telecom Italia | - |
R4‑148045 | LS on RSTD reporting granularity | Qualcomm | - |
R4‑148046 | Simulation assumptions for D2DSS detection simulation | Qualcomm | - |
R4‑148047 | LS on NAICS CA capability | Mediatek | - |
R4‑148048 | LS on CA performance tests | Qualcomm Incorporated | - |
R4‑148049 | Wayforward on tests for new RSRQ measurements | NTT DOCOMO | - |
R4‑148050 | Maintenance of CA performance requirements (Rel-10) | Huawei, HiSilicon | - |
R4‑148051 | Maintenance of CA performance requirements (Rel-11) | Huawei, HiSilicon | - |
R4‑148052 | Maintenance of CA performance requirements (Rel-12) | Huawei, HiSilicon | - |
R4‑148053 | Introducing interruption requirements for dual connectivity into TS36.133 | Huawei, HiSilicon, Intel, MediaTek,CATT,DoCoMo,Alcatel-Lucent,Ericsson,ZTE | - |
R4‑148054 | Introducing positioning enhancement requirement for UE Rx-Tx accuracy | Huawei, HiSilicon | - |
R4‑148055 | CR to introduce CQI test for 3 DL CA | Qualcomm Incorporated | - |
R4‑148056 | WF on SU-MIMO rank test | Ericsson | - |
R4‑148057 | LS on D2D synchronization window | Qualcomm | - |
R4‑148058 | CR on RRM requirement for D2D | Qualcomm Incorporated, Microsoft, | - |
R4‑148059 | 25.101 CR on new reference measurement channels due to introduction of DCH enhancements | Qualcomm Inc. | - |
R4‑148060 | 25.101 CR on performance requirements for downlink power control due to introduction of DCH enhancements | Qualcomm Inc. | - |
R4‑148061 | Wayforward on synchronization requirements for D2D | Qualcomm | - |
R4‑148062 | WF on simulation assumptions for D2D REFSENS demodulation | Qualcomm | - |
R4‑148063 | LS on D2D synchronization window | Qualcomm | - |
R4‑148064 | LS on MCH BLER report mapping | CATT | - |
R4‑148065 | Booked for RRM session | - | - |
R4‑148066 | Booked for RRM session | - | - |
R4‑148067 | Booked for RRM session | - | - |
R4‑148068 | Booked for RRM session | - | - |
R4‑148069 | Booked for RRM session | - | - |
R4‑148070 | Booked for RRM session | - | - |
R4‑148071 | Booked for RRM session | - | - |
R4‑148072 | Booked for RRM session | - | - |
R4‑148073 | Booked for RRM session | - | - |
R4‑148074 | Booked for RRM session | - | - |
R4‑148075 | Booked for RRM session | - | - |
R4‑148076 | Booked for RRM session | - | - |
R4‑148077 | Booked for RRM session | - | - |
R4‑148078 | Booked for RRM session | - | - |
R4‑148079 | Booked for RRM session | - | - |
R4‑148080 | Booked for RRM session | - | - |
R4‑148081 | Booked for RRM session | - | - |
R4‑148082 | Booked for RRM session | - | - |
R4‑148083 | Booked for RRM session | - | - |
R4‑148084 | Booked for RRM session | - | - |
R4‑148085 | Booked for RRM session | - | - |
R4‑148086 | Booked for RRM session | - | - |
R4‑148087 | Booked for RRM session | - | - |
R4‑148088 | Booked for RRM session | - | - |
R4‑148089 | Booked for RRM session | - | - |
R4‑148090 | Booked for RRM session | - | - |
R4‑148091 | Booked for RRM session | - | - |
R4‑148092 | Booked for RRM session | - | - |
R4‑148093 | Booked for RRM session | - | - |
R4‑148094 | Booked for RRM session | - | - |
R4‑148095 | Adhoc minutes on D2D | Qualcomm | - |
R4‑148096 | New capability set for excluding GSM single-RAT operation | Ericsson, Nokia Networks | - |
R4‑148097 | WF on 256QAM capability | NTT DOCOMO, INC., Orange, Vodafone, T-mobile USA, Telecom Italia | - |
R4‑148098 | Introduction of 2UL non-contiguous intra-band CA | Nokia Corporation | - |
R4‑148099 | [DRAFT] LS on 2UL inter-band CA protection of GNSS | NTT DOCOMO, INC. | - |
R4‑148100 | LS on requirements for 2UL CA | NTT Docomo | - |
R4‑148101 | Band 7+8 reference sensitivity and TP to 36.851 | Vodafone | - |
R4‑148102 | TP for TR36.xxx: UE RF requirements for CA_B1_B18_B28 | KDDI | - |
R4‑148103 | LS on RAN2 agreements on RA preamble power ramping suspension (R2-145304 Source: TSG RAN WG2, To: TSG RAN WG1, Cc: TSG RAN WG4) | TSG RAN WG2 | - |
R4‑148104 | Response LS on further MBMS operations support for E-UTRAN (R2-145390 Source: TSG RAN WG2, To: TSG RAN WG1, Cc: TSG RAN WG4) | TSG RAN WG2 | - |
R4‑148105 | Framework for MID band relaxations | Nokia Corporation | - |
R4‑148106 | LS on cat0 UE features in Rel-12 (R1-145463 Source: TSG RAN WG1, To: TSG RAN,TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑148107 | Future CA WI naming, WI acronym, TR handling and WID content | Ericsson, Nokia Corporation | - |
R4‑148108 | Addition of 2UL non-contiguous intraband CA feature | Nokia Corporation | - |
R4‑148109 | UE to UE co-existence between B42/B43 | TeliaSonera, Nokia Corporation, Ericsson, Qualcomm, Intel | - |
R4‑148110 | UE to UE co-existence between B42/B43 | TeliaSonera, Nokia Corporation, Ericsson, Qualcomm, Intel | - |
R4‑148111 | UE to UE co-existence between B42/B43 | TeliaSonera, Nokia Corporation, Ericsson, Qualcomm, Intel | - |
R4‑148112 | Reply LS on: Incomplete requirements for Band 28, 42 and 43 | TeliaSonera | - |
R4‑148113 | Agreement on LEE TRP requirements for band I and VIII | Vodafone, Samsung | - |
R4‑148114 | WF on range of declaration of EIRP | Huawei, SEI, NEC | - |
R4‑148115 | WF on 256QAM capability | NTT DOCOMO, INC., Orange, Vodafone, T-mobile USA, Telecom Italia | - |
R4‑148116 | Introduction of LC MTC into TS 36.101 | Huawei, Hisilicon | - |
R4‑148117 | LS on 2UL inter-band CA protection of GNSS | NTT DOCOMO, INC. | - |
R4‑148118 | Introduction of CA band combinations for dual uplink in TS 36.307 Rel-11 | LG Electronics, and LG Uplus | - |
R4‑148119 | TP to 36.853 to add B7 and B8 to CA_7+8+20 | Vodafone | - |
R4‑148120 | Response LS to GCF on OTA Test requirements | Samsung | - |
R4‑148121 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑148122 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑148123 | Wayforward on small cell enhancement | Huawei,HiSilicon | - |
R4‑148124 | Introduction of additional band combinations for 3DL inter-band CA | - | - |
R4‑148125 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑148126 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑148127 | Inclusion of 3DL CA combinations to 36.307 | Ericsson | - |
R4‑148128 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑148129 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑148130 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
page generated from database: 2024-07-20 12:15:34