3GPP TDocs (written contributions) at meeting
Meeting: S2-62 - 2008-01-14 to 2008-01-18, Marina Del Rey
meeting id: S2-62 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S2‑080001 | Draft Agenda for SA WG2 meeting #62 | SA WG2 Chairman | Revised in S2-080005 |
S2‑080002 | Draft Report of SA WG2 meeting #61 | SA WG2 Secretary | Approved |
S2‑080003 | Draft Agenda for IMS SWG meeting at SA WG2 meeting #62 | IMS SWG Chairman | Revised in S2-080128 |
S2‑080004 | SA WG2 Chairman's Notes from SA#38 | SA WG2 Chairman | Noted |
S2‑080005 | Draft Agenda for SA WG2 meeting #62 | SA WG2 Chairman | Approved |
S2‑080006 | LS (from CT WG1) on Closed Subscriber Groups for LTE Home cells | CT WG1 (C1-072156) | Noted |
S2‑080007 | Reply LS (from SA WG4) on QoS Characterization for LTE/EPS | SA WG4 (S4-070596) | Noted |
S2‑080008 | LS (from TSG CT) on New WI and TR for Diameter-based protocols usage and recommendations in 3GPP | TSG CT (CP-070682) | Postponed to meeting #63 |
S2‑080009 | Response LS (from TSG GERAN) to TC-RT DMO Group clarification regarding radio aspect of DMO | TSG GERAN (GP-071538) | Postponed to meeting #63 |
S2‑080010 | Liaison (from IEEE 802.11 WG) to 3GPP SA WG2 regarding future interworking co-operation | IEEE 802.11 WG (IEEE 802.11-07/2520r1) | Postponed to meeting #63 |
S2‑080011 | Reply LS on "SAE Interworking with Pre-REL8 system" | SA WG3 (S3-070835) | Noted |
S2‑080012 | Reply LS (from SA WG3) on S3-070794 LS on Security Mode Command procedure (R3-071749) | SA WG3 (S3-070837) | Noted |
S2‑080013 | LS from ITU-T Q.4/13 Rapporteur Group: ITU-T draft Recommendation Y.2111/Y.RACF R2, "Resource and admission control functions in Next Generation Networks" | ITU-T Q.4/13 Rapporteur Group (COM 13 -LS 215-E) | Postponed to meeting #63 |
S2‑080014 | Reply LS (from CT WG1) on redirection | CT WG1 (C1-072483) | Noted |
S2‑080015 | LS (from CT WG1) on Area and Access Restrictions | CT WG1 (C1-072484) | Noted |
S2‑080016 | Reply (from CT WG1) to LS on CSG Cells Handling | CT WG1 (C1-072709) | Noted |
S2‑080017 | LS (from RAN WG2) on Registration in registration in densely populated area (RED) | RAN WG2 (R2-072944) | Postponed to meeting #63 |
S2‑080018 | LS (from RAN WG2) on S101 Interface | RAN WG2 (R2-074582) | Noted |
S2‑080019 | LS from RAN WG3: Transfer of PDCP SDU Sequence Numbers over X2 Interface | RAN WG3 (R3-072019) | Noted |
S2‑080020 | LS from SA WG3: S6a Reference Point Security. | SA WG3 (S3-070842) | Noted |
S2‑080021 | Reply LS (from SA WG3) on Passing the private user identity to the PNM AS | SA WG3 (S3-070858) | Noted |
S2‑080022 | Reply (from SA WG3) to LS S3-070785 = S2-073909 on Security Parameters | SA WG3 (S3-070876) | Postponed to meeting #63 |
S2‑080023 | Reply LS (from SA WG3) on "LS on Home NodeB/eNodeB regarding localisation / authorisation" | SA WG3 (S3-070907) | Noted |
S2‑080024 | Reply LS (from SA WG1) on SAE Interworking with Pre-REL8 system | SA WG1 (S1-071887) | Noted |
S2‑080025 | LS (from SA WG1) on Home NodeB/eNodeB regarding localisation/authorisation | SA WG1 (S1-071900) | Postponed to meeting #63 |
S2‑080026 | LS (from SA WG1) on requirement on Overlap Signalling | SA WG1 (S1-071851) | Noted |
S2‑080027 | LS (from SA WG1) on support of "regional provisioning of service" in SAE/LTE | SA WG1 (S1-071845) | Noted |
S2‑080028 | LS (from SA WG1) on proposal for a new TR on "Emergency requirements in the PS domain for VoIP and emergency services" | SA WG1 (S1-071884) | Noted |
S2‑080029 | Reply LS (from SA WG3) on P-TMSI signature | SA WG3 (S3-070904) | Postponed to meeting #63 |
S2‑080030 | LS (from CT WG1) on completion of TR 24.880 and recommended architecture changes for AS/MRFC media control | CT WG1 (C1-073184) | Response drafted in S2-080591 |
S2‑080031 | LS (from CT WG1) on Network Initiated PDP Context | CT WG1 (C1-073190) | Response drafted in S2-080701 |
S2‑080032 | LS (from CT WG1) on new WID "IMS initiated and controlled PSS and MBMS user services" | CT WG1 (C1-073198) | Noted |
S2‑080033 | Reply LS (from CT WG4) (C4-071868/R3-072019) Transfer of PDCP SDU Sequence Numbers over X2 Interface | CT WG4 (C4-071892) | Noted |
S2‑080034 | LS (from CT WG4) on inclusion of IMSI in acknowledge message on S6a point | CT WG4 (C4-071899) | Postponed to meeting #63 |
S2‑080035 | LS (from CT WG4) on Existence of GGSN in Rel-8 | CT WG4 (C4-072013) | Response drafted in S2-080759 |
S2‑080036 | Reply (from CT WG4) to LS on Stage 2 Documentation Principles for SAE Specifications | CT WG4 (C4-072034) | Postponed to meeting #63 |
S2‑080037 | LS Reply (from CT WG4) on S6a Reference Point Security | CT WG4 (C4-072035) | Noted |
S2‑080038 | Reply (from RAN WG3) on LS on Area and Access Restrictions | RAN WG3 () | Response drafted in S2-080710 |
S2‑080039 | LS (from RAN WG3) on mechanism to support reordering in target eNB | RAN WG3 (R3-072409) | Response LS in S2-080714. CR in S2-080715 |
S2‑080040 | LS from RAN WG3: Request for clarification and feedback on switching of the UL Tunnel Endpoint at X2 Handover | RAN WG3 (R3-072409) | Response drafted in S2-080716 |
S2‑080041 | LS (from CT WG3) on protocol level support for the transfer of Gq' procedures to the Rx interface. | CT WG3 (C3-071111) | Noted |
S2‑080042 | LS (from RAN WG2) on need for Priority and PBR signaling as part of the QoS information | RAN WG2 (R2-075465) | Response drafted in S2-080788 |
S2‑080043 | Reply LS (*from RAN WG2) on CSG Cells Handling | RAN WG2 (R2-075456) | Noted |
S2‑080044 | LS (from RAN WG2) on "Principles on Idle Mode Signalling Reduction" | RAN WG2 (R2-075462) | Postponed to meeting #63 |
S2‑080045 | LS (from RAN WG2) on Packet Delay Budget | RAN WG2 (R2-075469) | Response drafted in S2-080788 |
S2‑080046 | LS (from RAN WG2) on Access Class barring | RAN WG2 (R2-075473) | Noted |
S2‑080047 | LS(from RAN WG2) on LS on "subscriber type" indication via S1 | RAN WG2 (R2-075458) | Response drafted in S2-080717 (if needed) |
S2‑080048 | Reply LS (from RAN WG2) on Registration in Densely-populated area - clarification on some technical issues | RAN WG2 (R2-075419) | Postponed to meeting #63 |
S2‑080049 | LS (from ETSI TISPAN WG1) on requirement on Overlap Signalling | ETSI TISPAN WG1 (15tTD044r3) | Noted |
S2‑080050 | LS (from CT WG4) on Existence of GGSN in Rel-8 | CT WG4 (C4-072013) | WITHDRAWN |
S2‑080051 | Reply LS (from GERAN WG2) on Registration in Densely-populated area - clarification on some technical issues | GERAN WG2 (GP-072007) | Postponed to meeting #63 |
S2‑080052 | LS (from GERAN WG2) on the introduction of A interface user plane over IP | GERAN WG2 (GP-072011) | Response LS in S2-080705 |
S2‑080053 | LS (from RAN WG2) on CSG related mobility (stage2 text) | RAN WG2 (R2-075478) | Noted |
S2‑080054 | Response LS (from RAN WG4) to SA WG3 on HomeNodeB authorization / localisation | RAN WG4 (R4-072152) | Noted |
S2‑080055 | LS (from SA WG1) on Network Discovery & Selection | SA WG1 (S1-071914) | Postponed to meeting #63 |
S2‑080056 | LS (from SA WG1) on Optimal Media Routing for IMS Sessions Requirement | SA WG1 (S1-071947) | Response LS in S2-080856 |
S2‑080057 | LS from the WiMAX Forum: Re: Requirements for optimized handover between Mobile WiMAX and 3GPP systems | WiMAX Forum | Noted |
S2‑080058 | LS (from TSG SA) on EPS interworking with WiMAX accesses | TSG SA (SP-070950) | Noted |
S2‑080059 | Follow-up to 3GPP2 LS on Mobility interworking between 3GPP and 3GPP2 systems. | TSG SA (SP-070955) | Noted |
S2‑080060 | Completion of communication service setting support | Research in Motion | Revised in IMS SWG to S2-080624 |
S2‑080061 | Draft skeleton of TS 23.216 | Rapporteur (Nokia Siemens Networks) | Noted as a basis for further updates |
S2‑080062 | SRVCC for 1xRTT CS | Nokia Siemens Networks, Verizon, Nortel, Alcatel-Lucent, Cisco, Motorola, Ericsson | Revised in S2-080819 |
S2‑080063 | 23.401 CR0001: Update of Attach procedure | Ericsson | Revised in parallel session in S2-080727 |
S2‑080064 | 23.401 CR0002: 3G to E-UTRAN IRAT Handover, non-3GDT support | Ericsson | Revised in parallel session in S2-080732 |
S2‑080065 | 23.401 CR0003: Corrections 2G-E-UTRAN IRAT Handover | Ericsson | Revised in parallel session in S2-080733 |
S2‑080066 | 23.401 CR0004: Corrections 3G-E-UTRAN IRAT Handover | Ericsson | Approved |
S2‑080067 | 23.401 CR0005: Restriction List Handling | Ericsson | Not Handled |
S2‑080068 | 23.401 CR0006: Update Network Triggered Service Request procedure with ISR functionality | Ericsson | Revised in parallel session in S2-080737 |
S2‑080069 | GUTI structure for P-TMSI compatibility | Ericsson | Not Handled |
S2‑080070 | Clarification of TAU and RAU procedures related to introduction of ISR | Ericsson | Noted |
S2‑080071 | GTP-PMIP roaming | Ericsson | Noted |
S2‑080072 | 23.401 CR0007: GTP-PMIP roaming | Ericsson | Revised in S2-080769 |
S2‑080073 | WITHDRAWN | Ericsson | - |
S2‑080074 | GW Selection issues | Ericsson | Noted |
S2‑080075 | WITHDRAWN | Ericsson | - |
S2‑080076 | IP address allocation and protocol configuration using DHCP | Ericsson | Revised in S2-080688 |
S2‑080077 | 23.401 CR0009: IP address allocation and protocol configuration using DHCP | Ericsson | Revised in S2-080772 |
S2‑080078 | 23.402 CR0002: IP address allocation and protocol configuration using DHCP | Ericsson | Revised in S2-080771 |
S2‑080079 | 23.401 CR0010: Clarification on transfer of charging characteristics | Ericsson | Not Handled |
S2‑080080 | Dual stack issue | Ericsson | Noted |
S2‑080081 | 23.401 CR0011: Changes for Dual stack in GERAN/UTRAN | Ericsson | Revised in parallel session in S2-080731 |
S2‑080082 | Bearer mapping between PDP Contexts and EPS Bearers | Ericsson | Noted |
S2‑080083 | 23.401 CR0012: Bearer mapping between PDP Cxt and EPS Bearers | Ericsson | Noted |
S2‑080084 | Connection of pre-Rel-8 GGSN to EPC | Ericsson | Noted |
S2‑080085 | 23.401 CR0013: Connection of pre-Rel-8 GGSN to EPC | Ericsson | Noted |
S2‑080086 | Discussion on a Rel-8 GGSN | Ericsson | Noted |
S2‑080087 | 23.401 CR0014: Updates on Rel-8 GGSN | Ericsson | Not Handled |
S2‑080088 | Draft Reply LS on Existence of GGSN in Rel8 | Ericsson | Not Handled |
S2‑080089 | Serving GW relocation when PMIP is used at S5/S8 | Ericsson, Nortel Networks, Nokia Siemens Networks, Verizon, Cisco, Motorola, Alcatel-Lucent, KDDI | Noted |
S2‑080090 | 23.401 CR0015: Serving GW relocation when PMIP is used at S5/S8 | Ericsson, Nortel Networks, Nokia Siemens Networks, Verizon, Cisco, Motorola, Alcatel-Lucent, KDDI | Revised in S2-080811 |
S2‑080091 | 23.402 CR0003: Serving GW relocation when PMIP is used at S5/S8 | Ericsson, Nortel Networks, Nokia Siemens Networks, Verizon, Cisco, Motorola, Alcatel-Lucent, KDDI | Revised in S2-080810 |
S2‑080092 | Refinements to handover between non-3GPP and 3GPP accesses | Ericsson | Noted |
S2‑080093 | 23.401 CR0016: Refinements to handover between non-3GPP and 3GPP accesses | Ericsson | Revised in parallel session in S2-080824 |
S2‑080094 | 23.402 CR0004: Interactions between HSS and AAA in call flows non-3GPP access | Ericsson | Not Handled |
S2‑080095 | Availability of access technology type in EPS | Ericsson | Noted |
S2‑080096 | 23.402 CR0005: Support for sending Access type information across PMIP based interfaces: S5/S8/S2a/S2b | Ericsson | Noted |
S2‑080097 | 23.402 CR0006: PDN GW selection for multiple PDN connections with S2a | Ericsson | Approved |
S2‑080098 | 23.402 CR0007: Activation of additional PDN connection for PMIP-based S5/S8 | Ericsson | Revised in S2-080806 |
S2‑080099 | 23.401 CR0017: Default Bearer modification without QoS update | Ericsson | Revised in parallel session in S2-080827 |
S2‑080100 | 23.401 CR0018: AMBR modification | Ericsson | Not Handled |
S2‑080101 | 23.401 CR0019: Parameters used at PCRF interaction at Attach (E-UTRAN) | Ericsson | Revised in parallel session in S2-080728 |
S2‑080102 | 23.203 CR0062: Role of the vPCRF | Ericsson | Revised in S2-080763 |
S2‑080103 | Role of the vPCRF | Ericsson | Noted |
S2‑080104 | 23.203 CR0063: Architecture and functional entities for Rel-8 | Ericsson | Revised in S2-080762 |
S2‑080105 | 23.203 CR0064: Documentation strategy for incorporating items from 23.401/23.402 into 23.203 | Ericsson | Revised in S2-080760 |
S2‑080106 | 23.401 CR0059: Priority as a QCI Characteristic | Ericsson, Alcatel-Lucent, AT&T, Cisco, Huawei, Motorola, Nokia, Nokia Siemens Networks, Nortel, Rogers Wireless, Samsung, Starent Networks, TeliaSonera, Verizon Wireless, Vodafone | Noted. Merged in S2-080787 |
S2‑080107 | Rationale for CR 0064 provided in S2-080274 | Ericsson | Noted |
S2‑080108 | Rationale for CR 0065 provided in S2-080275 | Ericsson | Noted |
S2‑080109 | 23.401 CR0060: Recommended QCI to DiffServ Code Point Mapping | Ericsson | Revised in S2-080792 |
S2‑080110 | 23.401 CR0061: Clean-up of QoS Sections in 23.401 | Ericsson | Revised in S2-080793 |
S2‑080111 | 23.401 CR0062: MME Initiated Bearer Modification | Ericsson | Revised in parallel session in S2-080730 |
S2‑080112 | 23.401 CR0063: Subscriber Type on S1 | Ericsson, T-Mobile, China Mobile, Samsung | Revised in S2-080718 |
S2‑080113 | 23.203 CR0065: Rx reference point domain definition | Ericsson | Revised in S2-080765 |
S2‑080114 | Proposal for how to progress work on PCRF discovery in cooperation with CT3 | Ericsson | Not Handled |
S2‑080115 | 23.401 CR0020: Inclusion of EIR reference point in SAE architecture | Ericsson | Revised in parallel session in S2-080828 |
S2‑080116 | 23.401 CR0021: Missing subscription data | Ericsson | Not Handled |
S2‑080117 | 23.401 CR0022: User Identity to HSS resolution | Ericsson | Not Handled |
S2‑080118 | 23.402 CR0008: User Identity to HSS resolution | Ericsson | Not Handled |
S2‑080119 | 23.060 CR0607R1: GGSN selection based on subscription information | China Mobile, Nokia-Siemens Network | Not Handled |
S2‑080120 | 23.401 CR0023: IMEI checking issue | China Mobile | Noted |
S2‑080121 | CS Fallback Requirement analysis | China Mobile | Not Handled |
S2‑080122 | SAE MBMS WID | China Mobile | Revised in S2-080707 |
S2‑080123 | WITHDRAWN | China Mobile | - |
S2‑080124 | Improvements to Alternative 2 for VCC for IMS Emergency Calls | Qualcomm Europe | Revised in IMS SWG to S2-080599 |
S2‑080125 | Extended Call Establishment for IMS Emergency Calls | Qualcomm Europe | Revised in IMS SWG to S2-080609 |
S2‑080126 | Extended Location Support for IMS Emergency Calls | Qualcomm Europe | Revised in IMS SWG to S2-080610 |
S2‑080127 | Guidelines for creation and revision of CRs | SA WG2 Secretary (M. Pope, MCC) | Noted |
S2‑080128 | Draft Agenda for IMS SWG meeting at SA WG2 meeting #62 | IMS SWG Chairman | Revised in S2-080295 |
S2‑080129 | 23.402 CR0009: Network Controlled Handovers with Mobile WiMAX | Intel, Sprint, Azaire Networks, Bridgewater Systems IPWireless, Interdigital, Nextwave | Revised in S2-080782 |
S2‑080130 | 23.401 CR0024: AMBR handling during HO from Release 7 GERAN/UTRAN to E-UTRAN | Huawei | Noted (Merged into S2-080736) |
S2‑080131 | 23.401 CR0025: AMBR handling during HO from Release 8 GERAN/UTRAN to E-UTRAN | Huawei | Noted |
S2‑080132 | 23.402 CR0010: Clarification about the AAA-initiated UE De-registration Notification procedure and Information Storage on the HSS. | Huawei | Not Handled |
S2‑080133 | Clarification on the IP-CAN type and RAT type | Huawei | Noted |
S2‑080134 | Clarification for PCRF selection. | Huawei | Noted |
S2‑080135 | 23.203 CR0066: Clarification for PCRF selection. | Huawei | Revised in S2-080764 |
S2‑080136 | 23.402 CR0011: Attach Type for 3GPP accesses. | Huawei | Not Handled |
S2‑080137 | 23.402 CR0012: Attach Type for Non-3GPP accesses | Huawei | Not Handled |
S2‑080138 | Discussion about UE triggered disconnection from one PDN | Huawei | Noted |
S2‑080139 | 23.401 CR0026: UE requested PDN disconnection procedure | Huawei | Revised in parallel session in S2-080833 |
S2‑080140 | 23.401 CR0027: Principles of multiple PDN support in 23.401 | Huawei | Noted |
S2‑080141 | Important principles to be determined with ISR | Huawei | Noted |
S2‑080142 | Update Type and URA_PCH handling | Huawei | Revised in parallel session in S2-080739 |
S2‑080143 | 23.401 CR0028: CR on TAU/RAU with ISR | Huawei | Revised in parallel session in S2-080738 |
S2‑080144 | 23.401 CR0029: Detach procedure with ISR | Huawei | WITHDRAWN |
S2‑080145 | WITHDRAWN | Huawei | - |
S2‑080146 | 23.401 CR0030: PCC Rules update in ISR | Huawei | Revised in parallel session in S2-080740 |
S2‑080147 | 23.401 CR0031: Relationship between EPS Bearer Identity and NSAPI/RAB ID | Huawei | Revised in parallel session in S2-080829 |
S2‑080148 | 23.401 CR0032: Correction of the MME Initiated Bearer procedures | Huawei | Revised in parallel session in S2-080830 |
S2‑080149 | 23.401 CR0033: Several FFS clean-up | Huawei | Revised in S2-080870 |
S2‑080150 | 23.401 CR0034: Clean up the FFS on UE without PDP Contexts Handing during TAU | Huawei | Not Handled |
S2‑080151 | 23.401 CR0035: Modification on GW Selection Function for 3GPP Access | Huawei | WITHDRAWN |
S2‑080152 | GUTI interworking with legacy network | Huawei | Noted |
S2‑080153 | 23.401 CR0036: GUTI and P-TMSI handling to solve combined node issue | Huawei | Revised in S2-080770 |
S2‑080154 | 23.401 CR0037: Editorial changes to the LTE to/from pre Rel-8 3G procedures | Huawei | Not Handled |
S2‑080155 | 23.401 CR0038: Removal of references to 'blue text' | Huawei | Not Handled |
S2‑080156 | 23.401 CR0039: Correction of CAMEL details for several pre Rel-8 procedures | Huawei | Not Handled |
S2‑080157 | 23.401 CR0040: Addition of supplemental and CAMEL details for Pre Rel-8 2G to LTE TAU | Huawei | Not Handled |
S2‑080158 | 23.402 CR0013: Bearer release control during handover from E-UTRAN to HRPD | Huawei | Revised in S2-080794 |
S2‑080159 | Optimization handover from HRPD to E-UTRAN | Huawei | Noted |
S2‑080160 | 23.402 CR0014: Optimization handover from HRPD to E-UTRAN | Huawei | Noted |
S2‑080161 | Optimized Idle Mode Handover from HRPD to E-UTRAN | Huawei | Noted |
S2‑080162 | 23.402 CR0015: Optimized Idle Mode Handover from HRPD to E-UTRAN | Huawei | Revised in parallel session in S2-080757 |
S2‑080163 | Rel-8 GPRS Architecture: PDP Context Activation, Modification, and Deactivation | Huawei | Noted |
S2‑080164 | 23.060 CR0608: Rel-8 GPRS Architecture: PDP Context Activation Procedure | Huawei | Not Handled |
S2‑080165 | 23.060 CR0609: Rel-8 GPRS Architecture: Secondary PDP Context Activation procedure | Huawei | Not Handled |
S2‑080166 | 23.060 CR0610: Rel-8 GPRS Architecture: Network-Requested Secondary PDP Context Activation | Huawei | Not Handled |
S2‑080167 | 23.060 CR0611: Rel-8 GPRS Architecture: PDP Context Modification Procedure | Huawei | Not Handled |
S2‑080168 | 23.060 CR0612: Rel-8 GPRS Architecture: PDP Context Deactivation procedure | Huawei | Not Handled |
S2‑080169 | 23.060 CR0613: Rel-8 GPRS Architecture: RAB Assignment Procedure | Huawei | Not Handled |
S2‑080170 | 23.060 CR0614: Rel-8 GPRS Architecture: Detach Procedures | Huawei | Not Handled |
S2‑080171 | Discussion the Issues in Chained S8/S2 Scenario | Huawei | Not Handled |
S2‑080172 | 23.402 CR0016: Modification on S8/S2 Chained Attach Procedure | Huawei | Not Handled |
S2‑080173 | 23.402 CR0017: Correction of Initial Attach Procedure with DSMIPv6 on S2c in Trusted Non-3GPP IP Access | Huawei | Not Handled |
S2‑080174 | 23.402 CR0018: Clarification on S-GW selection when Handover | Huawei | Revised in S2-080785 |
S2‑080175 | 23.402 CR0019: Handover flows between non-3GPP and 3GPP with chained S2/S8b | Huawei | Revised in S2-080786 |
S2‑080176 | 23.402 CR0020: IPMS indication in non-3GPP access network | Huawei, Qualcomm Europe, Marvell | Not Handled |
S2‑080177 | 23.402 CR0021: GRE encapsulation clarification | Huawei | WITHDRAWN |
S2‑080178 | 23.402 CR0022: Call flow corrections in S2c detach procedure | Huawei | WITHDRAWN |
S2‑080179 | 23.402 CR0023: Correction of UE-initiated Connectivity to Additional PDN procedure | Huawei | Approved |
S2‑080180 | 23.402 CR0024: Delete S7b messages in Detach procedure for S2b | Huawei | WITHDRAWN |
S2‑080181 | 23.402 CR0025: Correction of PCC related message name | Huawei | Approved |
S2‑080182 | Discussion on APN and GW Selection | Huawei | Noted |
S2‑080183 | 23.402 CR0026: Modification on GW Selection Function for Non-3GPP Access | Huawei | Not Handled |
S2‑080184 | 23.402 CR0027: Principles of multiple PDN support in 23.402 | Huawei | Revised in S2-080813 |
S2‑080185 | 23.402 CR0028: ePDG Function Clarification | Huawei | Revised in S2-080814 |
S2‑080186 | CS ->LTE SRVCC Solution Based on Alt-E | Huawei | Not Handled |
S2‑080187 | CS Fallback solution with SR-VCC Alt-E | Huawei | Not Handled |
S2‑080188 | Clarification for the service authorization | Huawei | Revised in IMS SWG to S2-080655 |
S2‑080189 | SC address retrieval for IMS MO procedure | Huawei | Revised in IMS SWG to S2-080654 |
S2‑080190 | Call flow for IM to SMSIP interworking | Huawei | Revised in IMS SWG to S2-080656 |
S2‑080191 | 23.204 CR0046: Call flow for IM to SMSIP interworking | Huawei | Revised in IMS SWG to S2-080658 |
S2‑080192 | Interconnection aspects for two CS network domains using SIP-I | Telecom Italia | Noted |
S2‑080193 | SMS Delivery to off-line IM subscriber | Comverse | WITHDRAWN |
S2‑080194 | IM to SMS termination with the interworking in the terminating side | Comverse | Revised in S2-080586 |
S2‑080195 | 23.402 CR0029: Correction in S2c reference point definition | Starent Networks | Not Handled |
S2‑080196 | Using PCC mechanisms to get IP-CAN information | Starent Networks | Revised in IMS SWG to S2-080613 |
S2‑080197 | 23.401 CR0041: A method to achieve load balancing | Huawei | Not Handled |
S2‑080198 | MBMS for HSPA | Huawei | Noted. LS to RAN WG3 drafted in S2-080708 |
S2‑080199 | 23.204 CR0047: SC address retrieval for IMS MO procedure | Huawei | Revised in IMS SWG to S2-080660 |
S2‑080200 | Procedure for the service level interworking in the terminating side in TR 23.811 | Huawei | Noted |
S2‑080201 | 23.204 CR0048: Procedure for the service level interworking in the terminating side in TS 23.204 | Huawei | Revised in IMS SWG to S2-080649 |
S2‑080202 | Conditions for SSMF Performing | Huawei | Noted |
S2‑080203 | The Relationship of ADS, MMSC AS and ICCF | Huawei | Noted |
S2‑080204 | Handover process of enhanced MSC | Huawei, Mavenir, Ericsson, NEC, Nokia, Nokia Simens Network, China Mobile, Vodafone | Not Handled |
S2‑080205 | ICS Architecture: Section 5.4.x Mn Reference Point | Huawei | Revised in IMS SWG to S2-080640 |
S2‑080206 | Conclusion on handling of multiple media for IMS Centralized Services | Huawei | Revised in IMS SWG to S2-080628 |
S2‑080207 | Clarification the function of IMSC on video call | Huawei | Not Handled |
S2‑080208 | Clarification of CS Bearers | Huawei | Revised in IMS SWG to S2-080629 |
S2‑080209 | Clarification of CS call leg for mid-call services | Huawei | Not Handled |
S2‑080210 | Conclusion on indicating Specific Service Execution by the AS | Huawei | Noted |
S2‑080211 | 23.228 CR0762: Indicating Specific Services Execution by the AS with Multiple Services Supplied | Huawei | Noted |
S2‑080212 | Interworking between two IM CN subsystems using different media codec | Huawei, Telecom Italia, Ericsson | Noted |
S2‑080213 | 23.228 CR0763: Interworking between two IM CN subsystems using different media codecs | Huawei, Telecom Italia, Ericsson | Revised in IMS SWG to S2-080672 |
S2‑080214 | Customized Alerting Tones (CAT) in the 3GPP IMS domain | China Mobile | Approved |
S2‑080215 | Introduction and Scope for CAT in IMS Domain | China Mobile | Revised in IMS SWG to S2-080671 |
S2‑080216 | SA Approved WID on IMS CAT | China Mobile | Noted (Already TSG SA approved) |
S2‑080217 | WID on IMS Service Continuity | LG Electronics, Huawei, Telecom Italia, Orange, BT, KDDI, NEC, Qualcomm Europe, SK Telecom, Telcordia, TOSHIBA, Marvell | Revised in S2-080702 |
S2‑080218 | TR 23.893 version 1.0.0 | LG Electronics (Rapporteur) | Approved |
S2‑080219 | Conclusions to TR 23.893 | LG Electronics, TOSHIBA, Huawei, Telecom Italia, Orange | Revised in IMS SWG to S2-080618 |
S2‑080220 | Session Transfer triggered by the network and Session Transfer Operator Policy | LG Electronics, TOSHIBA, Telecom Italia, Orange, Huawei, Marvell | Revised in IMS SWG to S2-080686 |
S2‑080221 | Rename M1 to V1 | LG Electronics, TOSHIBA, Qualcomm Europe, Huawei, Telecom Italia, Orange | Approved |
S2‑080222 | Authentication for I-WLAN mobility | Nokia Siemens Networks, Nokia, TeliaSonera, Azaire Networks, ZTE, Alcatel-Lucent, Qualcomm Europe, Orange | Noted |
S2‑080223 | 23.402 CR0030: Clarification on Access Authentication | Nokia Siemens Networks, Nokia, Verizon Wireless, Nortel, Alcatel-Lucent, Ericsson, Cisco | Revised in S2-080802 |
S2‑080224 | 23.402 CR0031: Relation of DSMIPv6 and 3GPP access | Nokia Siemens Networks, Nokia, Verizon Wireless, Ericsson, Huawei, ZTE, CATT, China Unicom | Revised in S2-080791 |
S2‑080225 | 23.402 CR0032: WiMAX interworking concept alignment with TSG SA#38 agreement | Nokia Siemens Networks, Nokia | Noted |
S2‑080226 | Draft TS for IMS Architecture | Alcatel-Lucent | Noted |
S2‑080227 | 23.002 CR0186: Deletion of IMS Architecture and configuration information | Alcatel-Lucent | Noted |
S2‑080228 | IWLAN Mobility - Home and Visited Mobility Service Architecture | Qualcomm Europe, ZTE, TeliaSonera, Alcatel-Lucent, Orange | Revised in parallel session in S2-080744 |
S2‑080229 | H1 PDN Attach | Qualcomm Europe, ZTE, TeliaSonera | Revised in parallel session in S2-080745 |
S2‑080230 | H1 PDN Detach | Qualcomm Europe, ZTE, TeliaSonera, Azaire Networks | Revised in parallel session in S2-080746 |
S2‑080231 | H1 Binding Update | Qualcomm Europe, ZTE, TeliaSonera, Alcatel-Lucent, Azaire Networks, Orange | Revised in parallel session in S2-080747 |
S2‑080232 | IWLAN Mobility - Accounting support | Qualcomm Europe, ZTE, TeliaSonera, Alcatel-Lucent, Azaire Networks | Revised in parallel session in S2-080748 |
S2‑080233 | Removal of section "Interactions with Other Services" | Qualcomm Europe, ZTE, TeliaSonera | Noted |
S2‑080234 | I-WLAN Mobility; General Concepts | Qualcomm Europe, ZTE, TeliaSonera | Noted |
S2‑080235 | Single-radio VCC for HSPA VoIP | Qualcomm Europe, Alcatel-Lucent | Not Handled |
S2‑080236 | Alt-E Clean-Up | Qualcomm Europe, Alcatel-Lucent, Huawei | Approved |
S2‑080237 | Alt-E SR-VCC applied to VoIP over HSPA | Qualcomm Europe, Alcatel-Lucent | Revised in S2-080690 |
S2‑080238 | Urgent delivery of messages & power efficient terminals. | Qualcomm Europe | Noted. Presentation in S2-080691 |
S2‑080239 | On NAS security setup during the Attach procedure | Qualcomm Europe | Noted |
S2‑080240 | 23.401 CR0042: NAS security setup during the Attach procedure | Qualcomm Europe | Revised in parallel session in S2-080729 |
S2‑080241 | APN indication in the Attach procedure | Qualcomm Europe | Not Handled |
S2‑080242 | 23.401 CR0043: APN indication in the Attach procedure | Qualcomm Europe | Noted |
S2‑080243 | 23.401 CR0044: Section on 'Security Function' | Qualcomm Europe | Revised in S2-080832 |
S2‑080244 | Discussion on signalling of MTU from MME to UE | Qualcomm Europe | Not Handled |
S2‑080245 | 23.401 CR0045: Signalling of MTU from MME to UE | Qualcomm Europe | Not Handled |
S2‑080246 | 23.401 CR0046: Clarification to EMM state machine | Qualcomm Europe | Noted |
S2‑080247 | WITHDRAWN | Qualcomm Europe | - |
S2‑080248 | 23.401 CR0047: Network Assisted Cell Change from E-UTRAN to GERAN | Qualcomm Europe | Not Handled |
S2‑080249 | WITHDRAWN | Qualcomm Europe | - |
S2‑080250 | Network Controlled dual-radio handover with Mobile WiMAX | Qualcomm Europe | Revised in S2-080585 |
S2‑080251 | 23.402 CR0033: IP Address Allocation and parameter configuration in case of S2c | Qualcomm Europe | Not Handled |
S2‑080252 | 23.402 CR0034: Cleanup of S2c Detach for trusted non-3GPP Accesses | Qualcomm Europe, Samsung | Not Handled |
S2‑080253 | 23.402 CR0035: S2c Detach for Untrusted non-3GPP Accesses | Qualcomm Europe, Samsung | Not Handled |
S2‑080254 | WITHDRAWN | Qualcomm Europe | - |
S2‑080255 | SRVCC solution selection | Alcatel-Lucent, Huawei, Qualcomm Europe | Noted |
S2‑080256 | TS 23.327 0.1.0 Mobility between I-WLAN and 3GPP Systems | Orange (Rapporteur) | Approved |
S2‑080257 | 23.401 CR0048: UE requested PDN connection release | CATT | Merged into S2-080838 |
S2‑080258 | 23.401 CR0049: High level description of Tracking and Reachability Management for UE in ECM-IDLE state | CATT | Not Handled |
S2‑080259 | 23.401 CR0050: Information Storage | CATT | Not Handled |
S2‑080260 | 23.401 CR0051: Paging for the ISR function | CATT | Noted |
S2‑080261 | 23.401 CR0052: E-UTRAN Tracking Area Update against GBR PDP context | CATT | Noted |
S2‑080262 | 23.401 CR0053: Clean-up of FFS on the forwarding in Inter-eNB HO | CATT | Not Handled |
S2‑080263 | 23.401 CR0054: PDN GW address in attach procedure | CATT | Not Handled |
S2‑080264 | 23.401 CR0055: The editorial modification for attach procedure | CATT | Not Handled |
S2‑080265 | 23.402 CR0037: APN in the handovers with PMIPV6 on S2a and S2b | CATT | Not Handled |
S2‑080266 | 23.402 CR0038: PDN GW function | CATT | Revised in S2-080815 |
S2‑080267 | 23.402 CR0039: Network Discovery and Selection and ePDG selection | CATT | Not Handled |
S2‑080268 | 23.221 CR0057: Any IP version support | Telecom Italia | Revised in IMS SWG to S2-080594 |
S2‑080269 | 23.228 CR0764: Any IP version support | Telecom Italia | Revised in IMS SWG to S2-080595 |
S2‑080270 | 23.401 CR0056: Selecting and signalling the security algorithms in handover from Rel-8 UTRAN to E-UTRAN | Nokia Siemens Networks, Nokia | Revised in parallel session in S2-080735 |
S2‑080271 | 23.401 CR0057: APN signalling in protected fashion | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080272 | MBMS Improvements in HSPA Architecture | Nokia Siemens Networks, Nokia | Noted. LS to RAN WG3 drafted in S2-080708 |
S2‑080273 | ETWS support in E-UTRAN | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080274 | 23.401 CR0064: Table of Standardized QCIs | Ericsson, Samsung, Nokia, Nokia Siemens Networks | Revised in S2-080787 |
S2‑080275 | 23.401 CR0065: Rate adaptation with "MBR>GBR bearers" | Ericsson | Revised in S2-080790 |
S2‑080276 | Documenting PMIP S5/S8 parameters exchanged on S10 and S11 interface | Motorola, Ericsson, Nokia Siemens Networks, Nortel | Noted. Option-2 endorsed |
S2‑080277 | 23.402 CR0040: PMIP-S5/S8 Parameters in S10 and S11 Messages | Motorola, Ericsson, Nokia Siemens Networks, Nortel | Revised in S2-080871 |
S2‑080278 | IRAT TAU/RAU and HO for PMIP-based S5/S8 Interface in 23.402 | Motorola, Samsung | Noted |
S2‑080279 | 23.402 CR0041: Modification of Handover and Tracking Area Update Procedures for PMIP-based S5/S8 Interface | Motorola, Samsung | Revised in S2-080816 |
S2‑080280 | 23.401 CR0058: Adding PDN GW address and TEID to UE Bearer Context in MME | Motorola | Not Handled |
S2‑080281 | 23.402 CR0042: Adding IEs related to PMIP-S5/S8 in information storage table | Motorola | Not Handled |
S2‑080282 | Timing of PCC and PMIP Signalling at Handover | Motorola, Cisco, KDDI, Nokia Siemens Networks, Nortel | Noted |
S2‑080283 | 23.402 CR0043: Timing of PCC and PMIP Signalling at Handover | Motorola, Cisco, KDDI, Nokia Siemens Networks, Nortel | Revised in S2-080783 |
S2‑080284 | 23.402 CR0044: Principles and Protocol Stack for S103 Interface | Motorola, Alcatel-Lucent, Cisco, Ericsson, Nokia Siemens Networks, Nortel, Verizon | Revised in parallel session in S2-080752 |
S2‑080285 | 23.402 CR0045: Dedicated Bearer Activation at Attach for PMIP-S5/S8 | Motorola, Samsung | Revised in S2-080872 |
S2‑080286 | Termination of INVITE for UE based T-ADS in case of I1-cs | Samsung | Revised in IMS SWG to S2-080621 |
S2‑080287 | UE domain selection for MT calls – Optimised call flow for I1-ps case | Samsung | Not Handled |
S2‑080288 | UE domain selection for MT calls – Optimised call flow for I1-cs case | Samsung | Not Handled |
S2‑080289 | TR 23.882 v1.13.1 | Vodafone | Noted |
S2‑080290 | DHCP Functionality in S-GW: DHCP Server or Relay Agent | Motorola | Not Handled |
S2‑080291 | 23.402 CR0046: DHCP Relay Functionality in S-GW | Motorola | Not Handled |
S2‑080292 | Conveying Static IP address from SGW to PGW during Initial Attach | Motorola | Not Handled |
S2‑080293 | 23.402 CR0047: Conveying Static IP address from SGW to PGW during Initial Attach | Motorola | Not Handled |
S2‑080294 | 23.402 CR0048: Deleting PCC Interactions from ePDG | Motorola | WITHDRAWN |
S2‑080295 | Draft Agenda for IMS SWG meeting at SA WG2 meeting #62 | IMS SWG Chairman | Noted |
S2‑080296 | 23.402 CR0049: Cleanup of the handover from trusted non-3GPP to GERAN/UTRAN | IPWireless, Nextwave | Not Handled |
S2‑080297 | 23.402 CR0050: Establishment of dedicated bearers during handover | IPWireless, Nextwave | Not Handled |
S2‑080298 | 23.402 CR0051: IP address allocation on S2a clean-up | IPWireless, Nextwave, Samsung | Not Handled |
S2‑080299 | 23.402 CR0052: IP address allocation using DHCP with PMIP-S5 | IPWireless, Nextwave, Samsung | Not Handled |
S2‑080300 | Scheduling based on QCI characteristics | IPWireless, Nextwave | Revised in S2-080781 |
S2‑080301 | WITHDRAWN | IPWireless, Nextwave | - |
S2‑080302 | 23.401 CR0066: UE Requested PDN Connectivity Release | NEC | Merged into S2-080838 |
S2‑080303 | 23.401 CR0067: Network Initiated Re-attach | NEC | Not Handled |
S2‑080304 | ICS Architecture: MSC Server enhancements for ICS | Mavenir, Nortel, Ericsson | Revised in IMS SWG to S2-080638 |
S2‑080305 | ICS Architecture – Mn interface | Mavenir, Nortel, Ericsson | Noted |
S2‑080306 | ICS Architecture: Section 5.4 - I2 Reference Point | Mavenir, Nortel, Ericsson | Revised in IMS SWG to S2-080641 |
S2‑080307 | H1 procedures for co-located PDG and HA | Azaire Networks | Revised in parallel session in S2-080750 |
S2‑080308 | Adding generic IP access to IWLAN mobility architecture | Azaire Networks | Revised in parallel session in S2-080751 |
S2‑080309 | Editor's note on transfer between UEs | Qualcomm Europe, LG Electronics | Revised in IMS SWG to S2-080614 |
S2‑080310 | Editor's note on M1 | Qualcomm Europe, LG Electronics | Noted |
S2‑080311 | Editor's note on single radio MMSC UE | Qualcomm Europe, Ericsson, LG Electronics | Revised in IMS SWG to S2-080615 |
S2‑080312 | Impacts and enhancements to the PCC architecture | Qualcomm Europe | Noted |
S2‑080313 | PS-PS session continuity call flow cleanup | Qualcomm Europe, LG Electronics | Approved |
S2‑080314 | Clarification to PS-PS session continuity call flows | Qualcomm Europe | WITHDRAWN |
S2‑080315 | 23.204 CR0049: Correction to Reference | Qualcomm Europe | Revised in IMS SWG to S2-080592 |
S2‑080316 | 23.204 CR0050: Correction to Reference | Qualcomm Europe | Revised in IMS SWG to S2-080593 |
S2‑080317 | 23.204 CR0051: IMDN Request | Qualcomm Europe | Revised in IMS SWG to S2-080661 |
S2‑080318 | SMS IM Interworking | Qualcomm Europe | WITHDRAWN |
S2‑080319 | 23.204 CR0052: SMS IM Interworking | Qualcomm Europe | Merged with S2-080649 to S2-080664 |
S2‑080320 | WITHDRAWN | Qualcomm Europe | - |
S2‑080321 | WITHDRAWN | Qualcomm Europe | - |
S2‑080322 | STI Assignment | Qualcomm Europe | Not Handled |
S2‑080323 | CAMEL Procedure Updates | Qualcomm Europe | Not Handled |
S2‑080324 | 23.228 CR0765: Support for Multiple Registration | Qualcomm Europe | Revised in IMS SWG to S2-080670 |
S2‑080325 | Comparison of the three scenarios for IMS Local Breakout | Qualcomm Europe | Noted |
S2‑080326 | Flows for IMS Local Breakout | Qualcomm Europe | Noted |
S2‑080327 | 23.402 CR0054: ePDG discovery during a handover from EUTRAN to untrusted non-3GPP access networks | Azaire Networks | Revised in S2-080873 |
S2‑080328 | 23.402 CR0055: Cleanup of Wa*, Wd*, Wx*, Wm* references points | Azaire Networks | Revised in S2-080874 |
S2‑080329 | WITHDRAWN | Azaire Networks | - |
S2‑080330 | WITHDRAWN | Alcatel-Lucent | - |
S2‑080331 | Handling of GBR traffic with MBR greater than GBR | Alcatel-Lucent | Noted |
S2‑080332 | 23.401 CR0068: Handling of QCI including GBR traffic with MBR greater than GBR | Alcatel-Lucent | Not Handled |
S2‑080333 | 23.167 CR0080: ePUID reference | Alcatel-Lucent | Revised in IMS SWG to S2-080597 |
S2‑080334 | 23.167 CR0081: P-CSCF procedure to align with 24.229 | Alcatel-Lucent | Revised in IMS SWG to S2-080598 |
S2‑080335 | Removal of FFS Statements on Proxy Binding Update Security | Motorola | Noted |
S2‑080336 | 23.402 CR0056: Removal of FFS Statements on Proxy Binding Update Security | Motorola | Revised in S2-080875 |
S2‑080337 | Home Agent Discovery | ZTE, Alcatel-Lucent, Azaire Networks, Orange, Qualcomm, TeliaSonera | Revised in parallel session in S2-080749 |
S2‑080338 | APN clarification | ZTE, Alcatel-Lucent, Azaire Networks, Orange, Qualcomm, TeliaSonera | Approved |
S2‑080339 | 23.401 CR0069: Update on IP address configuration procedures | Starent | Revised in S2-080711 |
S2‑080340 | 23.401 CR0070: Update on PDN GW selection procedures | Starent | Revised in S2-080712 |
S2‑080341 | 23.401 CR0071: Update on Serving GW selection procedures | Starent | Not Handled |
S2‑080342 | 23.402 CR0057: Additional PDN with MIPv4 FACoA on S2a | LG Electronics | Noted |
S2‑080343 | 23.402 CR0058: The UE's behaviour for IPMS (IP Mobility management Selection) | LG Electronics | Not Handled |
S2‑080344 | 23.402 CR0059: Additional IPMS(IP Mobility management Selection) related scenarios | LG Electronics | Not Handled |
S2‑080345 | S7a Session Relocation | Samsung | Noted |
S2‑080346 | WITHDRAWN | Samsung | - |
S2‑080347 | 23.402 CR0060: Non-3GPP Gateway Control Session Relocation | Samsung | Revised in S2-080766 |
S2‑080348 | 23.203 CR0094: Definitions for 23.203 | Samsung | Revised in S2-080761 |
S2‑080349 | 23.402 CR0061: Cleanup PDN Selection Procedure | Samsung | Revised in S2-080876 |
S2‑080350 | 23.402 CR0062: Addition of IEs to PMIP-based S5/S8 Procedures | Samsung | Revised in S2-080775 |
S2‑080351 | 23.402 CR0063: IEs for Non-3GPP Detach & Additional PDN Procedures | Samsung | Revised in S2-080779 |
S2‑080352 | 23.402 CR0064: Addition of IEs to Non-3GPP Resource Control Procedures | Samsung, Qualcomm Europe | Revised in S2-080780 |
S2‑080353 | 23.402 CR0065: Addition of IEs to Non-3GPP Untrusted Procedures | Samsung, Qualcomm Europe | Approved |
S2‑080354 | Access-independent Information Storage | Samsung | Not Handled |
S2‑080355 | Enabling MIPv4 FA CoA for non-3GPP IP accesses | Samsung | Noted |
S2‑080356 | 23.402 CR0066: MIPv4 FA CoA procedures for non-3GPP access to SAE | Samsung | Revised in S2-080778 |
S2‑080357 | WITHDRAWN | Samsung | - |
S2‑080358 | Need to update HSS with active PDNs | Samsung | Not Handled |
S2‑080359 | 23.401 CR0072: Corrections to support multiple PDNs during HO | Samsung | Revised in S2-080854 |
S2‑080360 | 23.401 CR0073: AMBR modification procedure | Samsung | Not Handled |
S2‑080361 | 23.401 CR0074: MME load re-balancing | Samsung | Not Handled |
S2‑080362 | 23.401 CR0075: Indication of local breakout session status | Samsung | Not Handled |
S2‑080363 | WITHDRAWN | ZTE | - |
S2‑080364 | 23.203 CR0095: CR for PCRF selection in roaming scenario | ZTE | Revised in S2-080767 |
S2‑080365 | WITHDRAWN | ZTE | - |
S2‑080366 | 23.203 CR0096: CR for information storage in DRA | ZTE | Revised in S2-080768 |
S2‑080367 | WITHDRAWN | ZTE | - |
S2‑080368 | WITHDRAWN | ZTE | - |
S2‑080369 | 23.203 CR0098: CR to update of procedures in Section 7 | ZTE | Not Handled |
S2‑080370 | 23.402 CR0068: Attach type | ZTE | Not Handled |
S2‑080371 | 23.402 CR0069: Clean up of handover procedures | ZTE | Revised in S2-080812 |
S2‑080372 | 23.402 CR0070: Authorization of connections to additional PDNs | ZTE | Not Handled |
S2‑080373 | 23.402 CR0071: UE initiated release of a PDN connection | ZTE | Not Handled |
S2‑080374 | 23.402 CR0072: Modification to handover procedure from non 3GPP to EUTRAN when S5/S8 is PMIP based | ZTE | Approved |
S2‑080375 | 23.401 CR0076: Correction of ECM-CONNECTED state | ZTE | Not Handled |
S2‑080376 | WITHDRAWN | ZTE | - |
S2‑080377 | 23.401 CR0077: Two TEIDs in Serving GW | ZTE | WITHDRAWN |
S2‑080378 | 23.401 CR0078: Correction on message name on S4 interface | ZTE | Not Handled |
S2‑080379 | 23.401 CR0079: Adding Serving GW change cause | ZTE | Revised in parallel session in S2-080734 |
S2‑080380 | 23.401 CR0080: UE context retrieval failure handling | ZTE | Not Handled |
S2‑080381 | MT calls in case of misaligned TA and LA | T-Mobile | Not Handled |
S2‑080382 | CS Fallback: Overview and Open Issues | NTT DoCoMo | Not Handled |
S2‑080383 | CS Fallback WID | NTT DoCoMo, T-Mobile, AT&T, China Mobile et al. | Revised in S2-080709 |
S2‑080384 | TS Skeleton for CS Fallback | NTT DoCoMo, NEC | Revised in S2-080862 |
S2‑080385 | CS Fallback with ISR | NTT DoCoMo | Not Handled |
S2‑080386 | WITHDRAWN | NTT DoCoMo | - |
S2‑080387 | 23.401 CR0081: GRE Key Exchange Using PMIP | NTT DoCoMo, Nortel, Alcatel-Lucent, Motorola | Revised in S2-080805 |
S2‑080388 | 23.401 CR0082: Fixing implementation error in Section 5.3.2.2, TS23.401 | NTT DoCoMo | Approved |
S2‑080389 | 23.8xx ETWS TR skeleton | NTT DoCoMo | Revised in parallel session in S2-080720 |
S2‑080390 | General section of ETWS TR | NTT DoCoMo | Revised in parallel session in S2-080721 |
S2‑080391 | Overview of ETWS | NTT DoCoMo | Noted |
S2‑080392 | Requirements of ETWS | NTT DoCoMo | Revised in parallel session in S2-080722 |
S2‑080393 | Considerations of ETWS | NTT DoCoMo | Approved |
S2‑080394 | General section for ETWS on EPS | NTT DoCoMo | Noted |
S2‑080395 | ETWS with E-MBMs (Alternative 1 – pure E-MBMS) | NTT DoCoMo | Revised in parallel session in S2-080723 |
S2‑080396 | ETWS with E-MBMs (Alternative 2 – Primary Notification in Session Start) | NTT DoCoMo | Revised in parallel session in S2-080724 |
S2‑080397 | General section for ETWS on UMTS | NTT DoCoMo | Noted |
S2‑080398 | ETWS with CBS (Alternative1 – existing CBS) | NTT DoCoMo | Not Handled |
S2‑080399 | ETWS with CBS (Alternative 2 - enhanced CBS) | NTT DoCoMo | Revised in parallel session in S2-080725 |
S2‑080400 | Conclusion on UMTS aspect of ETWS with CBS | NTT DoCoMo | Not Handled |
S2‑080401 | Add CS fallback function (General section) | NTT DoCoMo, NEC | Revised in S2-080864 |
S2‑080402 | Add CS fallback function (Reference Architecture) | NTT DoCoMo, NEC | Revised in S2-080865 |
S2‑080403 | Add CS fallback function (General section for Location management) | NTT DoCoMo, NEC | Revised in S2-080866 |
S2‑080404 | Add CS fallback function (Attach procedure) | NTT DoCoMo, NEC | Revised in S2-080867 |
S2‑080405 | Add CS fallback function (Detach procedure) | NTT DoCoMo, NEC | Revised in S2-080868 |
S2‑080406 | Add CS fallback function (EPS relocation procedure) | NTT DoCoMo, NEC | Not Handled |
S2‑080407 | WITHDRAWN | NTT DoCoMo, NEC | - |
S2‑080408 | Add CS fallback function (Mobile Originating procedure) | NTT DoCoMo, NEC | Not Handled |
S2‑080409 | Add CS fallback function (Mobile Terminating procedure) | NTT DoCoMo, NEC | Not Handled |
S2‑080410 | WITHDRAWN | NTT DoCoMo, NEC | - |
S2‑080411 | 23.401 CR0083: Add New EnodeB information onto handover related messages | NEC | Not Handled |
S2‑080412 | 23.401 CR0084: ECM State knowledge in SGW and acknowledgement of S1 release from eNB | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080413 | ICS open issues and conclusions | Huawei (ICS sessions chair) | Revised in IMS SWG to S2-080647 |
S2‑080414 | TR 23.811 v1.0.0 | Huawei (Rapporteur) | Approved |
S2‑080415 | 23.204 CR0053: Implementing the documentation guidance from TSG SA#38 | Huawei (Rapporteur) | Approved |
S2‑080416 | 23.402 CR0073: PDN GW reallocation procedure for the S2c reference point | Telecom Italia, TeliaSonera | Revised in S2-080784 |
S2‑080417 | 23.401 CR0085: Editorial correction of RFC reference | Panasonic | Not Handled |
S2‑080418 | 23.402 CR0074: Editorial corrections for TS 23.402 | Panasonic | Revised in S2-080877 |
S2‑080419 | 23.401 CR0086: Correction of Update Location in additional PDN connectivity procedure | Panasonic | WITHDRAWN |
S2‑080420 | 23.402 CR0075: Correction of PDN GW address update for Initial Attach procedure in MIPv4 case | Panasonic | Not Handled |
S2‑080421 | Adding procedure for MME Initiated Bearer Modification with Bearer QoS Update to TS 23.402 | Motorola | Noted |
S2‑080422 | 23.402 CR0076: Adding procedure for MME Initiated Bearer Modification with Bearer QoS Update to TS 23.402 | Motorola | Revised in S2-080878 |
S2‑080423 | 23.402 CR0077: Correction to Figure 5.2-1 | Motorola | WITHDRAWN |
S2‑080424 | 23.203 CR0099: Updating Section 6.1 to incorporate BBERF | Motorola | Not Handled |
S2‑080425 | 23.228 CR0766: Handling of incoming sessions for a subscription based business trunking arrangement | Ericsson | Noted |
S2‑080426 | Way forward on Terminating request handling for Corporate networks | Ericsson | Noted |
S2‑080427 | Reflections on architectural impacts of Overlap Signalling | Ericsson | Noted |
S2‑080428 | Discussion on handling of Directory numbers for Rel-8 emergency | Ericsson | Noted |
S2‑080429 | Addressing suppression of services during Call Back from PSAP | Ericsson | Noted |
S2‑080430 | Draft LS Response on "Network Initiated PDP Context" | Ericsson | Not Handled |
S2‑080431 | Discussion on Network Initiated PDP Context | Ericsson | Noted |
S2‑080432 | Fixing SMS-IM interworking | Ericsson | Revised in IMS SWG to S2-080652 |
S2‑080433 | 23.204 CR0054: Adding SMS to IM interworking procedures | Ericsson | Revised in IMS SWG to S2-080657 |
S2‑080434 | ICS and CSI users | Ericsson | Revised in IMS SWG to S2-080632 |
S2‑080435 | Conclusion on fallback solutions | Ericsson | Revised in S2-080693 |
S2‑080436 | Conclusion on T-ADS for IMS Centralized Services | Ericsson, Alcatel-Lucent, Nortel | Revised in S2-080694 |
S2‑080437 | Enhanced MSC server: usage with different UE types and co-existence with ICCF | Ericsson | Revised in S2-080695 |
S2‑080438 | O-SDS for the enhanced MSC server: potential IMS Subscriber | Ericsson, Mavenir | Revised in S2-080696 |
S2‑080439 | Relation between ICS and Service Continuity | Ericsson, Orange, Telecom Italia, LG Electronics, Nortel, Alcatel-Lucent | Revised in S2-080697 |
S2‑080440 | Discussion on procedures in setup of termination session | Ericsson | Revised in IMS SWG to S2-080622 |
S2‑080441 | ICS and Service Continuity | Ericsson | Revised in S2-080698 |
S2‑080442 | Evaluation of remaining SRVCC options | Ericsson, Nokia, Nokia-Siemens Networks, Nortel, Qualcomm | Revised in S2-080583 |
S2‑080443 | 23.401 CR0087: Providing S1 interfaces over un trusted networks | Starent Networks | Not Handled |
S2‑080444 | eNodeB routing of Attach and TAU Request based on RRC information | Nortel, Nokia Siemens Networks, Nokia | Not Handled |
S2‑080445 | 23.401 CR0088: eNodeB routing of Attach and TAU with STMSI | Nortel | Not Handled |
S2‑080446 | 23.401 CR0089: eNodeB routing of Attach and TAU with STMSI and PLMN indication | Nortel | Not Handled |
S2‑080447 | Serving GW sees PMM-IDLE state | Nortel | Noted |
S2‑080448 | 23.401 CR0090: Serving GW sees PMM-IDLE state | Nortel | Noted |
S2‑080449 | Serving GW triggers Rel8 SGSN paging via DL Data Notification message | Nortel | Noted |
S2‑080450 | 23.401 CR0091: Buffering in Serving GW and Downlink Data Notification message sent to Rel8 SGSN | Nortel | Noted (Merged into CR0011R1) |
S2‑080451 | Potential HSS update if no change of MME during TAU | Nortel | Noted |
S2‑080452 | 23.401 CR0092: Possible HSS update even if there is no MME change | Nortel | Revised in parallel session in S2-080741 |
S2‑080453 | 23.401 CR0093: Remove one FFS in section 5.3.3.4 (TAU in URA-PCH) | Nortel | Noted |
S2‑080454 | 23.401 CR0094: EPS Bearer Synchronisation in Service Request procedure | Nortel | Not Handled |
S2‑080455 | Access routing to reach the same combo SGSN / MME | Nortel | Not Handled |
S2‑080456 | 23.401 CR0095: eNB and BSC/RNC routing to reach same combo SGSN/MME | Nortel | Not Handled |
S2‑080457 | 23.401 CR0096: Reject TAU from 2G/3G if the UE has no interactive or background PDP Context | Nortel, Ericsson | Revised in parallel session to S2-080843 |
S2‑080458 | 23.401 CR0097: Annex E AMBR handling during HO | Nortel | Revised in S2-080736 |
S2‑080459 | No S4-U when the UE moves to PMM-IDLE in Rel-8 SGSN with Direct Tunnel | Nortel | Noted |
S2‑080460 | GERAN WG2 LS Response on the introduction of A interface user plane over IP | Ericsson | Revised in S2-080687 |
S2‑080461 | Rate Adaptation using ECN | Qualcomm Europe | Noted |
S2‑080462 | Home Link Operations clarifications | Orange | Noted |
S2‑080463 | 23.228 CR0767: Verification of access type value at the P-CSCF | Orange | Noted |
S2‑080464 | 23.203 CR0100: Verification of access type value requested by the AF at the PCRF | Orange | Not Handled |
S2‑080465 | WITHDRAWN | Orange | - |
S2‑080466 | Information flows for mobility of media components between different terminals | Motorola | Revised in IMS SWG to S2-080678 |
S2‑080467 | Information flows for media addition with redirection | Motorola | Revised in IMS SWG to S2-080679 |
S2‑080468 | Information flows for UE transfer | Motorola | Noted |
S2‑080469 | Introduction of Network Initiated Multimedia Session Transfer | Motorola | Revised in IMS SWG to S2-080686 |
S2‑080470 | Procedures to help the network take session transfer decisions | Motorola | WITHDRAWN |
S2‑080471 | WITHDRAWN | Motorola | - |
S2‑080472 | 23.401 CR0098: MME Overload Condition | RIM | Not Handled |
S2‑080473 | 23.401 CR0099: Multiple-PDN connectivity control | RIM, Marvell | Noted |
S2‑080474 | 23.402 CR0078: Multiple-PDN connectivity control for non-3GPP access | RIM, Marvell | WITHDRAWN |
S2‑080475 | 23.402 CR0079: Alignment of EUTRAN -> HRPD HO with updated inter S-GW HO | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Cisco, Nortel, KDDI | Revised in parallel session in S2-080753 |
S2‑080476 | 23.402 CR0080: Alignment of EUTRAN-HRPD HO with RAN2 and SA2 decisions | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Nortel, Cisco | Revised in parallel session in S2-080754 |
S2‑080477 | 23.402 CR0081: Special situations in EUTRAN - HRPD HO | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Nortel, Cisco | Revised in parallel session in S2-080755 |
S2‑080478 | Relationship between ICS and MMSC | Nortel | Revised in IMS SWG to S2-080596 |
S2‑080479 | ADS for ICS Users | Nortel, Samsung | Revised in IMS SWG to S2-080590 |
S2‑080480 | RUA in the session path | Nortel, ZTE | Noted |
S2‑080481 | ICS Association | Nortel, AT&T | Revised in IMS SWG to S2-080587 |
S2‑080482 | Use of IMSC for ICS UE | Nortel, AT&T | Revised in IMS SWG to S2-080623 |
S2‑080483 | I1-cs Optimisation | Nortel, AT&T | Noted |
S2‑080484 | Conclusion on use of ICCC for CS Terminations | Nortel | Revised in IMS SWG to S2-080622 |
S2‑080485 | ICS Requirements: ICS UE and non ICS UE definitions | Nortel, AT&T, Ericsson, Nokia Siemens Networks, Nokia, Alcatel-Lucent, Verizon, HP, Mavenir, NEC | Revised in IMS SWG to S2-080633 |
S2‑080486 | ICS Requirements: Service Consistency | AT&T, Nortel, Alcatel-Lucent | Revised in IMS SWG to S2-080634 |
S2‑080487 | ICS Requirements: Service Continuity | Nortel | Noted |
S2‑080488 | ICS Requirements: ICS UE Scenarios | Nortel, AT&T, Alcatel-Lucent, Samsung | Revised in IMS SWG to S2-080635 |
S2‑080489 | ICS Requirements: Co-existence of ICS UE and non ICS UE | Nortel, AT&T, Alcatel-Lucent, Samsung | Revised in IMS SWG to S2-080636 |
S2‑080490 | ICS Architecture: Section 5.1 (Overview) | Nortel, AT&T, HP, Alcatel-Lucent, Research In Motion, Mavenir | Revised in IMS SWG to S2-080643 |
S2‑080491 | ICS Architecture: Section 5.2 (Reference Architecture) | Nortel, AT&T | Revised in IMS SWG to S2-080588 |
S2‑080492 | ICS Architecture: Section 5.3 (Functional Entities) | Nortel, AT&T, Mavenir | Revised in IMS SWG to S2-080639 |
S2‑080493 | ICS Architecture: Section 5.4 (Reference Points) | Nortel, AT&T | Revised in IMS SWG to S2-080589 |
S2‑080494 | Requirements and Principles for Service Continuity | Nortel | Noted |
S2‑080495 | Negotiation of VCC Support – Alternative A | Nortel | Revised in IMS SWG to S2-080601 |
S2‑080496 | Emergency Calls Established in CS domain or transferred to CS Domain - Architecture | Nortel | Revised in IMS SWG to S2-080602 |
S2‑080497 | Emergency Calls Established in CS domain - Call Flows | Nortel | Revised in IMS SWG to S2-080603 |
S2‑080498 | DT Emergency Call Flows for PS to CS | Nortel | Revised in IMS SWG to S2-080607 |
S2‑080499 | DT Emergency Call Flows for CS to PS | Nortel | Revised in IMS SWG to S2-080608 |
S2‑080500 | Problem Scope for Tel-URI issue for Emergency Calls | Nortel | Noted |
S2‑080501 | 23.402 CR0082: On IPMS on handover between accesses | Marvell, Qualcomm Europe, Telecom Italia | Revised in S2-080809 |
S2‑080502 | 23.402 CR0083: On description and clarification for IPMS | Marvell, Telecom Italia, Qualcomm Europe | Not Handled |
S2‑080503 | 23.402 CR0084: Removal of editor’s notes for IP Mobility Management Selection | Marvell, Qualcomm Europe | Not Handled |
S2‑080504 | 23.402 CR0085: On IPMS solutions | Marvell, Telecom Italia, Qualcomm Europe | Revised in S2-080808 |
S2‑080505 | Discussion on providing indication to UE about the mobility protocol selected | Marvell, Telecom Italia | Not Handled |
S2‑080506 | 23.402 CR0086: On providing indication to UE about the mobility mode protocol selected | Marvell, Telecom Italia | Not Handled |
S2‑080507 | Discussion on mismatch scenarios for IPMS | Marvell, Qualcomm Europe | Not Handled |
S2‑080508 | 23.402 CR0087: Removal of editor’s note for handover with connectivity to multiple PDN GWs | Marvell | Not Handled |
S2‑080509 | 23.402 CR0088: Additional PDN connectivity over EUTRAN with PMIP-based network interfaces | Marvell | Not Handled |
S2‑080510 | Discussion on UE-initiated establishment of multiple PDN connectivity at initial attach over untrusted access using S2b interface | Marvell | Not Handled |
S2‑080511 | 23.402 CR0089: UE-initiated establishment of multiple PDN connectivity at initial attach over untrusted access using S2b interface | Marvell | Not Handled |
S2‑080512 | On the scenario of both home-routed and local breakout IMS sessions | Marvell | Noted |
S2‑080513 | Clarification of the IMS LBO scenario one | Marvell | Noted |
S2‑080514 | ICS Requirements: Service Continuity | Motorola. LGE | Noted |
S2‑080515 | Comments to Nortel et all - ICS Requirements: ICS UE Scenarios | Motorola, RIM | Noted |
S2‑080516 | ICS Architecture: Section 5.2 (Reference Architecture) | Motorola | Noted |
S2‑080517 | Proposal for IMS/LBO for Release 8 | Nokia Siemens Network, Nokia, Ericsson, Verizon | Revised in S2-080704 |
S2‑080518 | Allocation of Service Brokering Functions | Telcordia | Noted |
S2‑080519 | Use cases of service brokering functions | Telcordia | Noted |
S2‑080520 | 23.402 CR0090: Update on Serving GW selection procedures | Starent | Revised in S2-080713 |
S2‑080521 | 23.401 CR0100: The editorial modification for IRAT HO procedure | CATT | Not Handled |
S2‑080522 | WITHDRAWN | CATT | - |
S2‑080523 | Information flow modification for combined PS and CS origination | ZTE | Revised in IMS SWG to S2-080612 |
S2‑080524 | CCF Call flow for O-CSI Approach | ZTE, Nortel | Not Handled |
S2‑080525 | Discussion on EMC for ICS UE | ZTE, Nokia, Nokia Siemens Networks | Noted |
S2‑080526 | The Registration Expiration Time Setting for IMSC Server approach | ZTE | Not Handled |
S2‑080527 | Solution of Call Conference in the network based ICS Architecture | ZTE | Not Handled |
S2‑080528 | Scope Text for CS Fallback TS | NTT DoCoMo | Revised in S2-080863 |
S2‑080529 | Update to PS-PS session continuity in conjunction with CS-PS session continuity | Marvell | WITHDRAWN |
S2‑080530 | MMSC scenarios for un-trusted UEs | Marvell | WITHDRAWN |
S2‑080531 | On 3GPP - WiMAX Interworking | Nokia Siemens Networks, Nokia | Noted |
S2‑080532 | 23.401 CR0102: UE Location accuracy in the MME in ECM-CONNECTED state | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080533 | MO and MT call flows for GERAN not supporting PS HO | T-Mobile | Not Handled |
S2‑080534 | 23.402 CR0091: Handovers with MIPv4 FACoA on S2a/S2b | Motorola | Not Handled |
S2‑080535 | 23.401 CR0103: Correction of TAU procedure without SGW change | Nokia Siemens Networks, Nokia, Nortel | Revised in parallel session in S2-080742 |
S2‑080536 | 23.401 CR0104: NAS security algorithm change for MME change | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080537 | QoS Authorization for incomplete service information | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080538 | 23.203 CR0101: QoS Authorization for incomplete service information | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080539 | Discussion of registration in ICS | Alcatel-Lucent | Revised in IMS SWG to S2-080619 |
S2‑080540 | Emergency calls support for an ICS UE | Alcatel-Lucent | Revised in IMS SWG to S2-080626 |
S2‑080541 | ICS subscription discussion and proposal | Alcatel-Lucent | Noted |
S2‑080542 | Latest ICS TS version | Rapporteur (Alcatel-Lucent) | Approved |
S2‑080543 | Pseudo-CR to PDP Context Activation procedures for SAE/LTE in 23.060 | Vodafone | Not Handled |
S2‑080544 | Pseudo-CR to PDP Context Activation procedures for SAE/LTE in 23.060 | Vodafone | Noted |
S2‑080545 | Resolving some MME selection and Initial NAS message issues | Vodafone | Noted |
S2‑080546 | WITHDRAWN | Vodafone | - |
S2‑080547 | WITHDRAWN | Vodafone | - |
S2‑080548 | ETWS in GSM | Vodafone | Not Handled |
S2‑080549 | WITHDRAWN | Vodafone | - |
S2‑080550 | 23.401 CR0107: Clearing FFSes from HSS and MME data | Nokia, Nokia Siemens Networks | Not Handled |
S2‑080551 | Handling of Dual-stack EPS Bearers during attach and mobility to pre-R8 network | Nokia, Nokia Siemens Networks | Noted |
S2‑080552 | 23.401 CR0108: Handling of Dual-stack EPS Bearers during inter-RAT mobility | Nokia, Nokia Siemens Networks | Noted |
S2‑080553 | 23.402 CR0092: Updates in TS 23.402 for currently valid version of PMIPv6 draft | Nokia Siemens Networks, Nokia | Revised in S2-080869 |
S2‑080554 | 23.402 CR0093: Corrections in TS 23.402 for inconsistent references, cross-references and flow descriptions | Nokia Siemens Networks, Nokia | Revised in S2-080880 |
S2‑080555 | 23.402 CR0094: Clarifications for APN and W-APN | Nokia Siemens Networks, Nokia | Not Handled |
S2‑080556 | Consolidated Alternative D/F | Nokia Siemens Networks, Nokia, Nortel, Mavenir | Revised in S2-080820 |
S2‑080557 | Way forward for SR VCC with GSM/UMTS | Nortel, Nokia Siemens Networks, Nokia | Revised in S2-080818 |
S2‑080558 | SR VCC phasing approach for R8 with Alternative D/F | Nokia Siemens Network, Nokia, Nortel | Not Handled |
S2‑080559 | Introduction of a Gateway to connect IP-PBX to the IMS | Nokia Siemens Networks | Noted |
S2‑080560 | Mechanism to reduce the USSD message load of the HLR/HSS | Nokia Siemens Networks | Noted |
S2‑080561 | 23.204 CR0055: Terminology corrections | Nokia Siemens Networks, Nokia | Revised in S2-080978 |
S2‑080562 | 23.204 CR0056: IM to SM interworking procedure corrections | Nokia Siemens Networks, Nokia | Approved |
S2‑080563 | 23.228 CR0769: P-CSCF procedural correction for network initiated resource reservation | Nokia Siemens Networks, Nokia | WITHDRAWN |
S2‑080564 | 23.228 CR0770: P-CSCF procedural correction for network initiated resource reservation | Nokia Siemens Networks, Nokia | WITHDRAWN |
S2‑080565 | Session merge and IMS services | Nokia, Nokia Siemens Networks, Alcatel-Lucent, LG Electronics | Revised in IMS SWG to S2-080604 |
S2‑080566 | Clarification of multimedia session transfer information | Nokia, Nokia Siemens Networks, LG Electronics | Revised in IMS SWG to S2-080605 |
S2‑080567 | R-CAAF in ICCF and non transparent option for I1-cs in IMSC | Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-080685 |
S2‑080568 | WITHDRAWN | Nokia, Nokia Siemens Networks | - |
S2‑080569 | Removing the Editor's Note regarding service data model conversion | Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-080625 |
S2‑080570 | UE undetectable emergency sessions for ICS UE | Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-080627 |
S2‑080571 | IMS session setup and network initiated PDP context | Nokia, Nokia Siemens Networks | Noted |
S2‑080572 | Draft reply to LS on Network Initiated PDP Context | Nokia, Nokia Siemens Networks | Not Handled |
S2‑080573 | Default APN for legacy system | Samsung | Not Handled |
S2‑080574 | 23.401 CR0109: Clarification of default PDN and standardized Default APN | Samsung | Noted |
S2‑080575 | HRPD to EUTRAN Handover flows | Nortel, Verizon, NSN, Ericsson, Cisco, Alcatel-Lucent, Motorola | Noted |
S2‑080576 | 23.402 CR0095: HRPD to EUTRAN handover call flows | Nortel, Verizon, NSN, Ericsson, Cisco, Alcatel-Lucent, Motorola | Revised in parallel session in S2-080756 |
S2‑080577 | Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Noted |
S2‑080578 | 23.402 CR0096: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Revised in S2-080777 |
S2‑080579 | 23.402 CR0097: 3GPP - WiMAX network controlled mobility | Nortel | Noted |
S2‑080580 | Alternative solution for Local Breakout for IMS | Nortel, Verizon, Cisco | Revised in S2-080858 |
S2‑080581 | New scenario: Session duplication | NEC | Noted |
S2‑080582 | Transferring TS 23.206 into Release-8 specifications especially into ICS and Service Continuity TS | Orange | Noted |
S2‑080583 | Evaluation of remaining SRVCC options | Ericsson, Nokia, Nokia-Siemens Networks, Nortel, Qualcomm | Revised in S2-080699 |
S2‑080584 | Update of Scope | Ericsson, Vodafone, China Mobile | Revised in IMS SWG to S2-080606 |
S2‑080585 | Network Controlled dual-radio handover with Mobile WiMAX | Qualcomm Europe, Ericsson | Revised in S2-080703 |
S2‑080586 | IM to SMS termination with the interworking in the terminating side | Comverse, Ericsson | Revised in IMS SWG to S2-080648 |
S2‑080587 | ICS Association | Nortel, AT&T | Revised in IMS SWG to S2-080646 |
S2‑080588 | ICS Architecture: Section 5.2 (Reference Architecture) | Nortel, AT&T | Revised in IMS SWG to S2-080637 |
S2‑080589 | ICS Architecture: Section 5.4 (Reference Points) | Nortel, AT&T | Revised in IMS SWG to S2-080642 |
S2‑080590 | ADS for ICS Users | Nortel, Samsung | Revised in IMS SWG to S2-080620 |
S2‑080591 | Draft Reply LS on completion of TR 24.880 and recommended architecture changes for AS/MRFC media control | SA WG2 (IMS SWG) | Revised in IMS SWG to S2-080884 |
S2‑080592 | 23.204 CR0049R1: Correction to Reference | Qualcomm Europe | Revised in IMS SWG to S2-080684 |
S2‑080593 | 23.204 CR0050R1: Correction to Reference | Qualcomm Europe | Revised in IMS SWG to S2-080881 |
S2‑080594 | 23.221 CR0057R1: Any IP version support | Telecom Italia | Revised in S2-080983 |
S2‑080595 | 23.228 CR0764R1: Any IP version support | Telecom Italia | Approved |
S2‑080596 | Relationship between ICS and MMSC | Nortel | Revised in IMS SWG to S2-080617 |
S2‑080597 | 23.167 CR0080R1: ePUID reference | Alcatel-Lucent | Approved |
S2‑080598 | 23.167 CR0081R1: P-CSCF procedure to align with 24.229 | Alcatel-Lucent | Approved |
S2‑080599 | Improvements to Alternative 2 for VCC for IMS Emergency Calls | Qualcomm Europe | Revised in IMS SWG to S2-080895 |
S2‑080600 | Report on IMS-SWG Sessions | IMS-SWG Chairman (Thomas Towle, Qualcomm) | Approved |
S2‑080601 | Negotiation of VCC Support – Alternative A | Nortel | Approved |
S2‑080602 | Emergency Calls Established in CS domain or transferred to CS Domain - Architecture | Nortel | Approved |
S2‑080603 | Emergency Calls Established in CS domain - Call Flows | Nortel | Approved |
S2‑080604 | Session merge and IMS services | Nokia, Nokia Siemens Networks, Alcatel-Lucent, LG Electronics | Revised in IMS SWG to S2-080675 |
S2‑080605 | Clarification of multimedia session transfer information | Nokia, Nokia Siemens Networks, LG Electronics | Revised in IMS SWG to S2-080676 |
S2‑080606 | Update of Scope | Ericsson, Vodafone, China Mobile | Revised in IMS SWG to S2-080631 |
S2‑080607 | DT Emergency Call Flows for PS to CS | Nortel | Approved |
S2‑080608 | DT Emergency Call Flows for CS to PS | Nortel | Revised in IMS SWG to S2-080896 |
S2‑080609 | Extended Call Establishment for IMS Emergency Calls | Qualcomm Europe | Revised in IMS SWG to S2-080898 |
S2‑080610 | Extended Location Support for IMS Emergency Calls | Qualcomm Europe | Approved |
S2‑080611 | Draft LS on addressing suppression of services during Call Back from PSAP | SA WG2 (IMS SWG) | Revised in IMS SWG to S2-080899 |
S2‑080612 | Information flow modification for combined PS and CS origination | ZTE | Revised in IMS SWG to S2-080680 |
S2‑080613 | Using PCC mechanisms to get IP-CAN information | Starent Networks | Approved |
S2‑080614 | Editor's note on transfer between UEs | Qualcomm Europe, LG Electronics | Approved |
S2‑080615 | Editor's note on single radio MMSC UE | Qualcomm Europe, Ericsson, LG Electronics, KDDI, Telecom Italia | Revised in IMS SWG to S2-080882 |
S2‑080616 | ICS and Service Continuity | Ericsson, Telecom Italia, LG Electronics | For e-mail approval. Rev10 Updated in S2-081000 |
S2‑080617 | Relationship between ICS and MMSC | Nortel | Revised in IMS SWG to S2-080673 |
S2‑080618 | Conclusions to TR 23.893 | LG Electronics, TOSHIBA, Huawei, Telecom Italia, Orange | For e-mail approval. Rev4 Updated in S2-081001 |
S2‑080619 | Discussion of registration in ICS | Alcatel-Lucent | Revised in IMS SWG to S2-080887 |
S2‑080620 | ADS for ICS Users | Nortel, Samsung | Revised in IMS SWG to S2-080688 |
S2‑080621 | Termination of INVITE for UE based T-ADS in case of I1-cs | Samsung | Approved |
S2‑080622 | Discussion on procedures in setup of termination session | Ericsson | Approved |
S2‑080623 | Use of IMSC for ICS UE | Nortel, AT&T | Revised in IMS SWG to S2-080889 |
S2‑080624 | Completion of communication service setting support | Research in Motion | Revised in IMS SWG to S2-080891 |
S2‑080625 | Removing the Editor's Note regarding service data model conversion | Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-080892 |
S2‑080626 | Emergency calls support for an ICS UE | Alcatel-Lucent | Revised in IMS SWG to S2-080893 |
S2‑080627 | UE undetectable emergency sessions for ICS UE | Nokia, Nokia Siemens Networks | Noted |
S2‑080628 | Conclusion on handling of multiple media for IMS Centralized Services | Huawei | Approved |
S2‑080629 | Clarification of CS Bearers | Huawei | Approved |
S2‑080630 | Conclusion on fallback solutions | Ericsson, Mavenir, NEC | Approved |
S2‑080631 | Update of Scope | Ericsson, Vodafone, China Mobile | Revised in IMS SWG to S2-080885 |
S2‑080632 | ICS and CSI users | Ericsson | Revised in IMS SWG to S2-080886 |
S2‑080633 | ICS Requirements: ICS UE and non ICS UE definitions | Nortel, AT&T, Ericsson, Nokia Siemens Networks, Nokia, Alcatel-Lucent, Verizon, HP, Mavenir, NEC | Approved |
S2‑080634 | ICS Requirements: Service Consistency | AT&T, Nortel, Alcatel-Lucent | For e-mail approval. Rev2 Updated in S2-081002 |
S2‑080635 | ICS Requirements: ICS UE Scenarios | Nortel, AT&T, Alcatel-Lucent, Samsung | Approved |
S2‑080636 | ICS Requirements: Co-existence of ICS UE and non ICS UE | Nortel, AT&T, Alcatel-Lucent, Samsung | Approved |
S2‑080637 | ICS Architecture: Section 5.2 (Reference Architecture) | Nortel, AT&T | Approved |
S2‑080638 | ICS Architecture: MSC Server enhancements for ICS | Mavenir, Nortel, Ericsson | Approved |
S2‑080639 | ICS Architecture: Section 5.3 (Functional Entities) | Nortel, AT&T, Mavenir | Revised in IMS SWG to S2-080644 |
S2‑080640 | ICS Architecture: Section 5.4.x Mn Reference Point | Huawei | Approved |
S2‑080641 | ICS Architecture: Section 5.4 - I2 Reference Point | Mavenir, Nortel, Ericsson | Approved |
S2‑080642 | ICS Architecture: Section 5.4 (Reference Points) | Nortel, AT&T | Approved |
S2‑080643 | ICS Architecture: Section 5.1 (Overview) | Nortel, AT&T, HP, Alcatel-Lucent, Research In Motion, Mavenir | Approved |
S2‑080644 | ICS Architecture: Section 5.3 (Functional Entities) | Nortel, AT&T, Mavenir | Approved |
S2‑080645 | Relation between ICS and Service Continuity | Ericsson, Orange, Telecom Italia, LG Electronics, Nortel, Alcatel-Lucent, Motorola | Approved |
S2‑080646 | ICS Association | Nortel, AT&T | Approved |
S2‑080647 | ICS open issues and conclusions | Huawei (ICS sessions chair) | Agreed |
S2‑080648 | IM to SMS termination with the interworking in the terminating side | Comverse, Ericsson | Revised in IMS SWG to S2-080659 |
S2‑080649 | 23.204 CR0048R1: Procedure for the service level interworking in the terminating side in TS 23.204 | Huawei | Revised in IMS SWG to S2-080664 |
S2‑080650 | Terminating Request URI handling | SA WG2 (IMS SWG) | Revised in IMS SWG to S2-080651 |
S2‑080651 | WITHDRAWN | SA WG2 (IMS SWG) | - |
S2‑080652 | Fixing SMS to IM interworking | Ericsson, Comverse, Qualcomm | Approved |
S2‑080653 | Deployment clarifications | Ericsson | Revised in IMS SWG to S2-080666 |
S2‑080654 | SC address retrieval for IMS MO procedure | Huawei | Approved |
S2‑080655 | Clarification for the service authorization | Huawei | Approved |
S2‑080656 | Call flow for IM to SMSIP interworking | Huawei | Revised in IMS SWG to S2-080662 |
S2‑080657 | 23.204 CR0054R1: Adding SMS to IM interworking procedures | Ericsson, Comverse, Qualcomm | Revised in IMS SWG to S2-080665 |
S2‑080658 | 23.204 CR0046R1: Call flow for IM to SMSIP interworking | Huawei | Revised in IMS SWG to S2-080663 |
S2‑080659 | IM to SMS termination with the interworking in the terminating side | Comverse, Ericsson | Revised in IMS SWG to S2-080668 |
S2‑080660 | 23.204 CR0047R1: SC address retrieval for IMS MO procedure | Huawei | Revised in S2-080979 |
S2‑080661 | WITHDRAWN | Qualcomm Europe | - |
S2‑080662 | Call flow for IM to SMSIP interworking | Huawei | Approved |
S2‑080663 | 23.204 CR0046R2: Call flow for IM to SMSIP interworking | Huawei | Revised in S2-080980 |
S2‑080664 | 23.204 CR0048R2: Procedure for the service level interworking in the terminating side in TS 23.204 | Huawei | Revised in IMS SWG to S2-080669 |
S2‑080665 | 23.204 CR0054R2: Adding SMS to IM interworking procedures | Ericsson, Comverse, Qualcomm | Revised in S2-080981 |
S2‑080666 | Deployment clarifications | Ericsson | Revised in IMS SWG to S2-080682 |
S2‑080667 | 23.204 CR0057: Deployment clarifications | Ericsson | Revised in IMS SWG to S2-080683 |
S2‑080668 | IM to SMS termination with the interworking in the terminating side | Comverse, Ericsson | Approved |
S2‑080669 | 23.204 CR0048R3: Procedure for the service level interworking in the terminating side in TS 23.204 | Huawei | Revised in S2-080982 |
S2‑080670 | 23.228 CR0765R1: Support for Multiple Registration | Qualcomm Europe | Approved |
S2‑080671 | Introduction and Scope for CAT in IMS Domain | China Mobile | Approved |
S2‑080672 | 23.228 CR0763R1: Interworking between two IM CN subsystems using different media codecs | Huawei, Telecom Italia, Ericsson | Revised in IMS SWG to S2-080681 |
S2‑080673 | Relationship between ICS and MMSC | Nortel | Revised in IMS SWG to S2-080674 |
S2‑080674 | Relationship between ICS and MMSC | Nortel | Approved |
S2‑080675 | Session merge and IMS services | Nokia, Nokia Siemens Networks, Alcatel-Lucent, LG Electronics | Approved |
S2‑080676 | Clarification of multimedia session transfer information | Nokia, Nokia Siemens Networks, LG Electronics | Approved |
S2‑080677 | Session Transfer triggered by the network and Session Transfer Operator Policy | LG Electronics, TOSHIBA, Telecom Italia, Orange, Huawei, Marvell | Revised in IMS SWG to S2-080894 |
S2‑080678 | Information flows for mobility of media components between different terminals | Motorola | For e-mail approval. Rev2 Updated in S2-081002 |
S2‑080679 | Information flows for media addition with redirection | Motorola | For e-mail approval. Rev3 Updated in S2-081003 |
S2‑080680 | Information flow modification for combined PS and CS origination | ZTE | For e-mail approval. Rev7 Updated in S2-081004 |
S2‑080681 | 23.228 CR0763R2: Interworking between two IM CN subsystems using different media codecs | Huawei, Telecom Italia, Ericsson | Approved |
S2‑080682 | Deployment clarifications | Ericsson | Approved |
S2‑080683 | 23.204 CR0057R1: Deployment clarifications | Ericsson | Revised in IMS SWG to S2-080883 |
S2‑080684 | 23.204 CR0049R2: Correction to Reference | Qualcomm Europe | Approved |
S2‑080685 | R-CAAF in ICCF and non transparent option for I1-cs in IMSC | Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-080890 |
S2‑080686 | Session Transfer triggered by the network and Session Transfer Operator Policy | LG Electronics, TOSHIBA, Telecom Italia, Orange, Huawei, Marvell | Revised in IMS SWG to S2-080677 |
S2‑080687 | GERAN WG2 LS Response on the introduction of A interface user plane over IP | Ericsson | Revised in S2-080705 |
S2‑080688 | ADS for ICS Users | Nortel, Samsung | Noted |
S2‑080689 | Update of the scope section of 3GPP TS 23.292 | Telecom Italia, AT&T, Nortel | Noted |
S2‑080690 | Alt-E SR-VCC applied to VoIP over HSPA | Qualcomm Europe, Alcatel-Lucent | Not Handled |
S2‑080691 | ETWS Considerations and Proposed solutions | Qualcomm Europe | Revised in parallel session in S2-080726 |
S2‑080692 | TR 23.826 v.0.3.0 | Nortel | Approved |
S2‑080693 | Conclusion on fallback solutions | Ericsson, Mavenir, NEC | Revised in IMS SWG to S2-080630 |
S2‑080694 | Conclusion on T-ADS for IMS Centralized Services | Ericsson, , Alcatel-Lucent, Nortel, NEC, Telecom Italia | Approved |
S2‑080695 | Enhanced MSC server: usage with different UE types and co-existence with ICCF | Ericsson, Telecom Italia, NEC | Approved |
S2‑080696 | O-SDS for the enhanced MSC server: potential IMS Subscriber | Ericsson, Mavenir, NEC | Not Handled |
S2‑080697 | Relation between ICS and Service Continuity | Ericsson, Orange, Telecom Italia, LG Electronics, Nortel, Alcatel-Lucent, Motorola | Revised in IMS SWG to S2-080645 |
S2‑080698 | ICS and Service Continuity | Ericsson, Telecom Italia, LG Electronics | Revised in IMS SWG to S2-080616 |
S2‑080699 | Evaluation of remaining SRVCC options | Ericsson, Nokia, Nokia-Siemens Networks, Nortel, Qualcomm, Alcatel-Lucent, Huawei | Revised in S2-080801 |
S2‑080700 | LS (from SA WG3) on outstanding NAS messages | SA WG3 (S3a071035) | Postponed to meeting #63 |
S2‑080701 | LS on Network Initiated PDP Context | SA WG2 (Nokia) | Revised in S2-080984 |
S2‑080702 | WID on IMS Service Continuity | LG Electronics, Huawei, Telecom Italia, Orange, BT, KDDI, NEC, Qualcomm Europe, SK Telecom, Telcordia, TOSHIBA, Marvell | Revised in S2-080987 |
S2‑080703 | Network Controlled dual-radio handover with Mobile WiMAX | Qualcomm Europe, Ericsson, Rogers Wireless | Revised in S2-080795 |
S2‑080704 | Proposal for IMS/LBO for Release 8 | Nokia Siemens Network, Nokia, Ericsson, Verizon, Nortel, Alcatel-Lucent | Conclusions endorsed |
S2‑080705 | GERAN WG2 LS Response on the introduction of A interface user plane over IP | SA WG2 | Approved |
S2‑080706 | LS (from OMA MWG) on service level interworking | OMA MWG | Noted |
S2‑080707 | SAE MBMS WID | China Mobile | Revised in S2-080972 |
S2‑080708 | DRAFT LS on MBMS Improvements in HSPA Architecture | SA WG2 (Nokia Siemens Networks) | For e-mail approval. Agreed updated in S2-081006 |
S2‑080709 | CS Fallback WID | NTT DoCoMo, T-Mobile, Ericsson ?, China Mobile, NEC, AT&T?, Vodafone, NSN? | Revised in S2-080861 |
S2‑080710 | draft Reply on Reply LS on Area and Access Restrictions | SA WG2 (Nokia Siemens Networks) | Revised in S2-080995 |
S2‑080711 | 23.401 CR0069R1: Update on IP address configuration procedures | Starent | Revised in S2-080773 |
S2‑080712 | 23.401 CR0070R1: Update on PDN GW selection procedures | Starent | Not Handled |
S2‑080713 | 23.402 CR0090R1: Update on Serving GW selection procedures | Starent | Revised in S2-080719 |
S2‑080714 | Draft Reply LS on mechanism to support reordering in target eNB | SA WG2 (Nokia Siemens Networks) | Revised in S2-080961 |
S2‑080715 | 23.402 CR0110: Mechanism to support reordering in EUTRAN | Ericsson | Revised in S2-080960 |
S2‑080716 | Draft Reply LS Request for clarification and feedback on switching of the UL Tunnel Endpoint at X2 Handover | SA WG2 | Revised in S2-080963 |
S2‑080717 | LS on QoS Parameters via S1 | SA WG2 | Revised in S2-080914 |
S2‑080718 | 23.401 CR0063R1: Subscriber Type on S1 | Ericsson | Approved with objections from Telecom Italia and NTT DoCoMo |
S2‑080719 | 23.402 CR0090R2: Update on Serving GW selection procedures | Starent | Revised in S2-080807 |
S2‑080720 | 23.8xx ETWS TR skeleton | NTT DoCoMo | Approved |
S2‑080721 | General section of ETWS TR | NTT DoCoMo | Approved |
S2‑080722 | Requirements of ETWS | NTT DoCoMo | Revised in parallel session in S2-080834 |
S2‑080723 | ETWS with E-MBMs (Alternative 1 – pure E-MBMS) | NTT DoCoMo | Approved |
S2‑080724 | ETWS with E-MBMs (Alternative 2 – Primary Notification in Session Start) | NTT DoCoMo | Revised in parallel session in S2-080836 |
S2‑080725 | ETWS with CBS (Alternative 2 - enhanced CBS) | NTT DoCoMo | Revised in parallel session in S2-080837 |
S2‑080726 | WITHDRAWN | Qualcomm Europe | - |
S2‑080727 | 23.401 CR0001R1: Update of Attach procedure | Ericsson | Revised in parallel session in S2-080851 |
S2‑080728 | 23.401 CR0019R1: Parameters used at PCRF interaction at Attach (E-UTRAN) | Ericsson | Revised in parallel session in S2-080840 |
S2‑080729 | 23.401 CR0042R1: NAS security setup during the Attach procedure | Qualcomm Europe | Revised in parallel session in S2-080841 |
S2‑080730 | 23.401 CR0062R1: MME Initiated Bearer Modification | Ericsson | Merged into S2-080830 |
S2‑080731 | 23.401 CR0011R1: Changes for Dual stack in GERAN/UTRAN | Ericsson | Revised in S2-080852 |
S2‑080732 | 23.401 CR0002R1: 3G to E-UTRAN IRAT Handover, non-3GDT support | Ericsson | Revised in parallel session to S2-080844 |
S2‑080733 | 23.401 CR0003R1: Corrections 2G-E-UTRAN IRAT Handover | Ericsson | Approved |
S2‑080734 | 23.401 CR0079R1: Adding Serving GW change cause | ZTE | Approved |
S2‑080735 | 23.401 CR0056R1: Selecting and signalling the security algorithms in handover from Rel-8 UTRAN to E-UTRAN | Nokia Siemens Networks, Nokia | Revised in S2-080939 |
S2‑080736 | 23.401 CR0097R1: AMBR handling during HO | Nortel, Huawei | Revised in parallel session in S2-080846 |
S2‑080737 | 23.401 CR0006R1: Update Network Triggered Service Request procedure with ISR functionality | Ericsson | Revised in S2-080952 |
S2‑080738 | 23.401 CR0028R1: CR on TAU/RAU with ISR | Huawei | Approved |
S2‑080739 | Update Type and URA_PCH handling | Huawei | Noted |
S2‑080740 | 23.401 CR0030R1: PCC Rules update in ISR | Huawei | Revised in parallel session in S2-080847 |
S2‑080741 | 23.401 CR0092R1: Possible HSS update even if there is no MME change | Nortel | Approved |
S2‑080742 | 23.401 CR0103R1: Correction of TAU procedure without SGW change | Nokia Siemens Networks, Nokia, Nortel | Approved |
S2‑080743 | LS on Authentication for I-WLAN Mobility | SA WG2 | Approved |
S2‑080744 | IWLAN Mobility - Home and Visited Mobility Service Architecture | Qualcomm Europe, ZTE, TeliaSonera, Alcatel-Lucent, Orange | Approved |
S2‑080745 | H1 PDN Attach | Qualcomm Europe, ZTE, TeliaSonera | Approved |
S2‑080746 | H1 PDN Detach | Qualcomm Europe, ZTE, TeliaSonera, Azaire Networks | Approved |
S2‑080747 | H1 Binding Update | Qualcomm Europe, ZTE, TeliaSonera, Alcatel-Lucent, Azaire Networks, Orange | Approved |
S2‑080748 | IWLAN Mobility - Accounting support | Qualcomm Europe, ZTE, TeliaSonera, Alcatel-Lucent, Azaire Networks | Approved |
S2‑080749 | Home Agent Discovery | ZTE, Alcatel-Lucent, Azaire Networks, Orange, Qualcomm, TeliaSonera | Approved |
S2‑080750 | H1 procedures for co-located PDG and HA | Azaire Networks | Revised in parallel session in S2-080848 |
S2‑080751 | Adding generic IP access to IWLAN mobility architecture | Azaire Networks | Noted |
S2‑080752 | 23.402 CR0044R1: Principles and Protocol Stack for S103 Interface | Motorola, Alcatel-Lucent, Cisco, Ericsson, Nokia Siemens Networks, Nortel, Verizon | Revised in S2-080941 |
S2‑080753 | 23.402 CR0079R1: Alignment of EUTRAN -> HRPD HO with updated inter S-GW HO | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Cisco, Nortel, KDDI | Revised in parallel session in S2-080944 |
S2‑080754 | 23.402 CR0080R1: Alignment of EUTRAN-HRPD HO with RAN2 and SA2 decisions | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Nortel, Cisco | Approved |
S2‑080755 | 23.402 CR0081R1: Special situations in EUTRAN - HRPD HO | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Nortel, Cisco | Approved |
S2‑080756 | 23.402 CR0095R1: HRPD to EUTRAN handover call flows | Nortel, Verizon, NSN, Ericsson, Cisco, Alcatel-Lucent, Motorola | Revised in S2-080942 |
S2‑080757 | 23.402 CR0015R1: Optimized Idle Mode Handover from HRPD to E-UTRAN | Huawei | Approved |
S2‑080758 | 23.401 CR0112: ISR Principle | Huawei, Nortel, Nokia Siemens Networks, Nokia, ZTE | Approved |
S2‑080759 | Draft CT WG4 LS Response on Existence of GGSN in Rel-8 | SA WG2 (drafting session) | Revised in S2-080955 |
S2‑080760 | 23.203 CR0064R1: Documentation strategy for incorporating items from 23.401/23.402 into 23.203 | Ericsson | Approved |
S2‑080761 | 23.203 CR0094R1: Definitions for 23.203 | Samsung | Revised in S2-080920 |
S2‑080762 | 23.203 CR0063R1: Architecture and functional entities for Rel-8 | Ericsson | Approved |
S2‑080763 | 23.203 CR0062R1: Role of the vPCRF | Ericsson | Revised in S2-080921 |
S2‑080764 | 23.203 CR0066R1: Clarification for PCRF selection. | Huawei | Revised in S2-080922 |
S2‑080765 | 23.203 CR0065R1: Rx reference point domain definition | Ericsson | Revised in S2-080923 |
S2‑080766 | 23.402 CR0060R1: Non-3GPP Gateway Control Session Relocation | Samsung | Approved |
S2‑080767 | 23.203 CR0095R1: CR for PCRF selection in roaming scenario | ZTE | Revised in S2-080924 |
S2‑080768 | 23.203 CR0096R1: CR for information storage in DRA | ZTE | Revised in S2-080925 |
S2‑080769 | 23.401 CR0007R1: GTP-PMIP roaming | Ericsson | Revised in S2-080918 |
S2‑080770 | 23.401 CR0036R1: GUTI and P-TMSI handling to solve combined node issue | Huawei | Not Handled |
S2‑080771 | 23.402 CR0002R1: IP address allocation and protocol configuration using DHCP | Ericsson | Approved |
S2‑080772 | 23.401 CR0009R1: IP address allocation and protocol configuration using DHCP | Ericsson | Approved |
S2‑080773 | 23.401 CR0069R2: Update on IP address configuration procedures | Starent | Revised in S2-080966 |
S2‑080774 | LS to SA WG3 on end-to-end security of DHCP | SA WG2 (Starent) | Revised in S2-080950 |
S2‑080775 | 23.402 CR0062R1: Addition of IEs to PMIP-based S5/S8 Procedures | Samsung | Approved |
S2‑080776 | 23.401 CR0111: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Revised in S2-080930 |
S2‑080777 | 23.402 CR0096R1: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Revised in S2-080931 |
S2‑080778 | 23.402 CR0066R1: MIPv4 FA CoA procedures for non-3GPP access to SAE | Samsung | Revised in S2-080929 |
S2‑080779 | 23.402 CR0063R1: IEs for Non-3GPP Detach & Additional PDN Procedures | Samsung | Approved |
S2‑080780 | 23.402 CR0064R1: Addition of IEs to Non-3GPP Resource Control Procedures | Samsung, Qualcomm Europe | Approved |
S2‑080781 | Scheduling based on QCI characteristics | IPWireless, Nextwave | Noted |
S2‑080782 | 23.402 CR0009R1: Network Controlled Handovers with Mobile WiMAX | Intel, Sprint, Azaire Networks, Bridgewater Systems IPWireless, Interdigital, Nextwave, ETRI, BT Group, ... | Noted |
S2‑080783 | 23.402 CR0043R1: Timing of PCC and PMIP Signalling at Handover | Motorola, Cisco, KDDI, Nokia Siemens Networks, Nortel | Revised in S2-080927 |
S2‑080784 | 23.402 CR0073R1: PDN GW reallocation procedure for the S2c reference point | Telecom Italia, TeliaSonera | Revised in S2-080928 |
S2‑080785 | 23.402 CR0018R1: Clarification on S-GW selection when Handover | Huawei | Approved |
S2‑080786 | 23.402 CR0019R1: Handover flows between non-3GPP and 3GPP with chained S2/S8b | Huawei | Noted |
S2‑080787 | 23.401 CR0064R1: Table of Standardized QCIs | Ericsson | Approved |
S2‑080788 | LS on QoS Parameters via S1 | SA WG2 | Revised in S2-080913 |
S2‑080789 | Draft LS on QoS Characterization for LTE/EPS | SA WG2 (Qualcomm) | Revised in S2-080964 |
S2‑080790 | 23.401 CR0065R1: Rate adaptation with "MBR>GBR bearers" | Ericsson | Revised in S2-080912 |
S2‑080791 | 23.402 CR0031R1: Relation of DSMIPv6 and 3GPP access | Nokia Siemens Networks, Nokia, Verizon Wireless, Ericsson, Huawei, ZTE, CATT, China Unicom | Revised in S2-080804 |
S2‑080792 | 23.401 CR0060R1: Recommended QCI to DiffServ Code Point Mapping | Ericsson | Revised in S2-080919 |
S2‑080793 | 23.401 CR0061R1: Clean-up of QoS Sections in 23.401 | Ericsson | Approved |
S2‑080794 | 23.402 CR0013R1: Bearer release control during handover from E-UTRAN to HRPD | Huawei | Noted |
S2‑080795 | Network Controlled dual-radio handover with Mobile WiMAX | Qualcomm Europe, Ericsson, Rogers Wireless | Noted |
S2‑080796 | LS from SA WG3: Reply to S3a071004= R2-074587 and S3a070987 = S2-075795 on Signalling for Paging | SA WG3 (S3a071018) | Postponed to meeting #63 |
S2‑080797 | LS (from SA WG3) on SAE Interworking with Pre-REL8 system | SA WG3 (S3a071030) | Postponed to meeting #63 |
S2‑080798 | LS (from SA WG3) on security for service request message | SA WG3 (S3a071047) | Postponed to meeting #63 |
S2‑080799 | LS (from SA WG3) on Access authentication for non-3GPP access in EPS | SA WG3 (S3a071052) | Postponed to meeting #63 |
S2‑080800 | Framework for Gq'/Rx Harmonization draft skeleton | Rapporteur | Noted |
S2‑080801 | Evaluation of remaining SRVCC options | Ericsson, Nokia, Nokia-Siemens Networks, Nortel, Qualcomm, Alcatel-Lucent, Huawei | Revised in S2-080821 |
S2‑080802 | 23.402 CR0030R1: Clarification on Access Authentication | Nokia Siemens Networks, Nokia, Verizon Wireless, Nortel, Alcatel-Lucent, Ericsson, Cisco | Approved |
S2‑080803 | CS Fallback: Report of the offline drafting session | Drafting Session Convener (Itsuma Tanaka / NTT DoCoMo) | Noted |
S2‑080804 | 23.402 CR0031R2: Relation of DSMIPv6 and 3GPP access | Nokia Siemens Networks, Nokia, Verizon Wireless, Ericsson, Huawei, ZTE, CATT, China Unicom | Revised in S2-080926 |
S2‑080805 | 23.401 CR0081R1: GRE Key Exchange Using PMIP | NTT DoCoMo, Nortel, Alcatel-Lucent, Motorola | Approved (but withdrawn as should be a CR to 23.402) |
S2‑080806 | 23.402 CR0007R1: Activation of additional PDN connection for PMIP-based S5/S8 | Ericsson | Approved |
S2‑080807 | 23.402 CR0090R3: Update on Serving GW selection procedures | Starent | Revised in S2-080917 |
S2‑080808 | 23.402 CR0085R1: On IPMS solutions | Marvell, Telecom Italia, Qualcomm Europe | Revised in S2-080915 |
S2‑080809 | 23.402 CR0082R1: On IPMS on handover between accesses | Marvell, Qualcomm Europe, Telecom Italia | Revised in S2-080916 |
S2‑080810 | 23.402 CR0003R1: Serving GW relocation when PMIP is used at S5/S8 | Ericsson, Nortel Networks, Nokia Siemens Networks, Verizon, Cisco, Motorola, Alcatel-Lucent, KDDI | Approved. Merged version with CR0041R1 (S2-080816) in S2-080817 |
S2‑080811 | 23.401 CR0015R1: Serving GW relocation when PMIP is used at S5/S8 | Ericsson, Nortel Networks, Nokia Siemens Networks, Verizon, Cisco, Motorola, Alcatel-Lucent, KDDI | Approved |
S2‑080812 | 23.402 CR0069R1: Clean up of handover procedures | ZTE | Revised in S2-080933 |
S2‑080813 | 23.402 CR0027R1: Principles of multiple PDN support in 23.402 | Huawei | Revised in S2-080936 |
S2‑080814 | 23.402 CR0028R1: ePDG Function Clarification | Huawei | Approved |
S2‑080815 | 23.402 CR0038R1: PDN GW function | CATT | Revised in S2-080973 |
S2‑080816 | 23.402 CR0041R1: Modification of Handover and Tracking Area Update Procedures for PMIP-based S5/S8 Interface | Motorola, Samsung | Approved. Merged version with CR0003R1 (S2-080810) in S2-080817 |
S2‑080817 | Combining 23.402 CR 0003R1 and CR 0041R1. | Ericsson, Nortel Networks, Nokia Siemens Networks, Verizon, Cisco, Motorola, Alcatel-Lucent, KDDI, Motorola, Samsung | Approved |
S2‑080818 | Way forward for SR VCC with GSM/UMTS | Nortel, Nokia Siemens Networks, Nokia | Noted |
S2‑080819 | SRVCC for 1xRTT CS | Nokia Siemens Networks, Verizon, Nortel, Alcatel-Lucent, Cisco, Motorola, Ericsson | Approved |
S2‑080820 | Consolidated Alternative D/F | Nokia Siemens Networks, Nokia, Nortel, Mavenir | Approved |
S2‑080821 | Evaluation of remaining SRVCC options | Ericsson, Nokia, Nokia-Siemens Networks, Nortel, Qualcomm, Alcatel-Lucent, Huawei | Approved |
S2‑080822 | SRVCC Architecture | Drafting group | Noted |
S2‑080823 | Issues List of QoS Model for Rel-8 GPRS | Huawei | Noted. To be used for inputs to next meeting |
S2‑080824 | 23.401 CR0016R1: Refinements to handover between non-3GPP and 3GPP accesses | Ericsson | Revised in S2-080989 |
S2‑080825 | Draft LS on inter-MME load balancing, Attach/TAU/Service Request procedures and corresponding RRC/S1 connection establishment procedures | SA WG2 (drafting session) | Revised in S2-080957 |
S2‑080826 | Draft LS on the need of charging characteristics | SA WG2 (drafting session) | Revised in S2-080954 |
S2‑080827 | 23.401 CR0017R1: Default Bearer modification without QoS update | Ericsson | Approved |
S2‑080828 | 23.401 CR0020R1: Inclusion of EIR reference point in SAE architecture | Ericsson | Revised in S2-080946 |
S2‑080829 | 23.401 CR0031R1: Relationship between EPS Bearer Identity and NSAPI/RAB ID | Huawei | Approved |
S2‑080830 | 23.401 CR0032R1: Correction of the MME Initiated Bearer procedures | Huawei | Revised in S2-080953 |
S2‑080831 | 23.401 CR0033R2: Several FFS clean-up | Huawei | Revised in S2-080938 |
S2‑080832 | 23.401 CR0044R1: Section on 'Security Function' | Qualcomm Europe | Approved |
S2‑080833 | 23.401 CR0026R1: UE requested PDN disconnection procedure | Huawei | Revised in S2-080838 |
S2‑080834 | Requirements of ETWS | NTT DoCoMo | Approved |
S2‑080835 | [draft] LS on ETWS for Connected-Mode UE. | SA WG2 (NTT DoCoMo) | Revised in S2-080947 |
S2‑080836 | ETWS with E-MBMs (Alternative 2 – Primary Notification in Session Start) | NTT DoCoMo | Approved |
S2‑080837 | ETWS with CBS (Alternative 2 - enhanced CBS) | NTT DoCoMo | Approved |
S2‑080838 | 23.401 CR0026R2: UE requested PDN disconnection procedure | Huawei | Revised in S2-080943 |
S2‑080839 | 23.401 CR0097R2: AMBR handling during HO | Nortel, Huawei | WITHDRAWN |
S2‑080840 | 23.401 CR0019R2: Parameters used at PCRF interaction at Attach (E-UTRAN) | Ericsson | Approved |
S2‑080841 | 23.401 CR0042R2: NAS security setup during the Attach procedure | Qualcomm Europe | Revised in S2-080945 |
S2‑080842 | 23.402 CR0079R2: Alignment of EUTRAN -> HRPD HO with updated inter S-GW HO | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Cisco, Nortel, KDDI | WITHDRAWN |
S2‑080843 | WITHDRAWN (Corrupt file) | - | WITHDRAWN |
S2‑080844 | 23.401 CR0002R2: 3G to E-UTRAN IRAT Handover, non-3GDT support | Ericsson | Revised in S2-080990 |
S2‑080845 | 23.401 CR0001R2: Update of Attach procedure | Ericsson | WITHDRAWN |
S2‑080846 | 23.401 CR0097R2: AMBR handling during HO | Nortel, Huawei | Revised in parallel session in S2-080849 |
S2‑080847 | 23.401 CR0030R2: PCC Rules update in ISR | Huawei | Approved |
S2‑080848 | H1 procedures for co-located PDG and HA | Azaire Networks | Approved |
S2‑080849 | 23.401 CR0097R3: AMBR handling during HO | Nortel, Huawei | Revised in S2-080940 |
S2‑080850 | Drafting Notes:8.2.1, 8.2.4, 8.2.8, 8.2.9, 8.3.1.1, 8.3.1.2, 8.3.3, 8.3.4, 8.3.5, 8.3.6, 10.1, 10,5 | Magnus Olsson | Noted |
S2‑080851 | 23.401 CR0001R2: Update of Attach procedure | Ericsson | Revised in S2-080959 |
S2‑080852 | 23.401 CR0011R2: Changes for Dual stack in GERAN/UTRAN | Ericsson | Revised in S2-080949 |
S2‑080853 | 23.402 CR0099: Principles for 3GPP-Mobile Wimax interworking | Drafting group | Revised in S2-080911 |
S2‑080854 | 23.401 CR0072R1: Corrections to support multiple PDNs during HO | Samsung, Panasonic | Not Handled |
S2‑080855 | Reply LS (from RAN WG2) on Earthquake and Tsunami Warning System | RAN WG2 (R2-080582) | Postponed to meeting #63 |
S2‑080856 | LS on Optimal Media Routing for IMS Sessions Requirement | SA WG2 | Revised in S2-080994 |
S2‑080857 | Work Item Description: System enhancements for the use of IMS services in local breakout | Telecom Italia, Marvell?, LG Electronics?, Verizon Wireless?, Verizon?, Alcatel-Lucent?, BT?, Vodafone?, Nokia Siemens Networks?, Nortel?, Huawei?, Motorola?, Ericsson? | Revised in S2-080860 |
S2‑080858 | Alternative solution for Local Breakout for IMS | Nortel, Verizon, Cisco | Revised in S2-080996 |
S2‑080859 | Update to IMS LBO Study Item | Telecom Italia, Marvell, LG Electronics, Verizon Wireless, Verizon, Alcatel-Lucent, BT, Vodafone, Nokia Siemens Networks, Nortel, Huawei, Motorola, Ericsson | Revised in S2-080986 |
S2‑080860 | Work Item Description: System enhancements for the use of IMS services in local breakout | Telecom Italia, Marvell , LG Electronics , Verizon Wireless , Verizon , Alcatel-Lucent , BT , Vodafone , Nokia Siemens Networks , Nortel , Huawei , Motorola , Ericsson | Revised in S2-080985 |
S2‑080861 | CS Fallback WID | NTT DoCoMo, T-Mobile, Ericsson, China Mobile, NEC, AT&T, Vodafone, NSN | Approved |
S2‑080862 | TS Skeleton for CS Fallback | NTT DoCoMo, NEC | Approved |
S2‑080863 | Scope Text for CS Fallback TS | NTT DoCoMo | Approved |
S2‑080864 | Add CS fallback function (General section) | NTT DoCoMo, NEC | Revised in S2-080997 |
S2‑080865 | Add CS fallback function (Reference Architecture) | NTT DoCoMo, NEC | Revised in S2-080998 |
S2‑080866 | Add CS fallback function (General section for Location management) | NTT DoCoMo, NEC | Approved |
S2‑080867 | Add CS fallback function (Attach procedure) | NTT DoCoMo, NEC | Revised in S2-080999 |
S2‑080868 | Add CS fallback function (Detach procedure) | NTT DoCoMo, NEC | Approved |
S2‑080869 | 23.402 CR0092R1: Updates in TS 23.402 for currently valid version of PMIPv6 draft | Nokia Siemens Networks, Nokia | Revised in S2-080879 |
S2‑080870 | 23.401 CR0033R1: Several FFS clean-up | Huawei | Revised in parallel session in S2-080831 |
S2‑080871 | 23.402 CR0040R1: PMIP-S5/S8 Parameters in S10 and S11 Messages | Motorola, Ericsson, Nokia Siemens Networks, Nortel | Approved (but withdrawn as should be a CR to 23.401) |
S2‑080872 | 23.402 CR0045R1: Dedicated Bearer Activation at Attach for PMIP-S5/S8 | Motorola, Samsung | Approved |
S2‑080873 | 23.402 CR0054R1: ePDG discovery during a handover from EUTRAN to untrusted non-3GPP access networks | Azaire Networks | Revised in S2-080935 |
S2‑080874 | 23.402 CR0055R1: Cleanup of Wa*, Wd*, Wx*, Wm* references points | Azaire Networks | Revised in S2-080934 |
S2‑080875 | 23.402 CR0056R1: Removal of FFS Statements on Proxy Binding Update Security | Motorola | Approved |
S2‑080876 | 23.402 CR0061R1: Cleanup PDN Selection Procedure | Samsung | Approved |
S2‑080877 | 23.402 CR0074R1: Editorial corrections for TS 23.402 | Panasonic | Approved |
S2‑080878 | 23.402 CR0076R1: Adding procedure for MME Initiated Bearer Modification with Bearer QoS Update to TS 23.402 | Motorola | Noted. New CR created in S2-080974 |
S2‑080879 | 23.402 CR0092R2: Updates in TS 23.402 for currently valid version of PMIPv6 draft | Nokia Siemens Networks, Nokia | Revised in S2-080975 |
S2‑080880 | WITHDRAWN | Nokia Siemens Networks, Nokia | - |
S2‑080881 | 23.204 CR0050R2: Correction to Reference | Qualcomm Europe | Approved |
S2‑080882 | Editor's note on single radio MMSC UE | Qualcomm Europe, Ericsson, LG Electronics, KDDI, Telecom Italia | Noted |
S2‑080883 | 23.204 CR0057R2: Deployment clarifications | Ericsson | Approved |
S2‑080884 | Draft LS on completion of TR 24.880 and recommended architecture changes for AS/MRFC media control. | SA WG2 (IMS SWG) | Revised in S2-080976 |
S2‑080885 | Update of Scope | Ericsson, Vodafone, China Mobile | Approved |
S2‑080886 | ICS and CSI users | Ericsson | Approved |
S2‑080887 | Discussion of registration in ICS | Alcatel-Lucent | Approved |
S2‑080888 | Reserved for IMS SWG | - | Approved |
S2‑080889 | Use of IMSC for ICS UE | Nortel, AT&T | Approved |
S2‑080890 | R-CAAF in ICCF and non transparent option for I1-cs in IMSC | Nokia, Nokia Siemens Networks | Approved |
S2‑080891 | Completion of communication service setting support | Research in Motion | For e-mail approval. Approved |
S2‑080892 | Removing the Editor's Note regarding service data model conversion | Nokia, Nokia Siemens Networks | For e-mail approval. Rev5 Updated in S2-081007 |
S2‑080893 | Emergency calls support for an ICS UE | Alcatel-Lucent | Approved |
S2‑080894 | Session Transfer triggered by the network and Session Transfer Operator Policy | LG Electronics, TOSHIBA, Telecom Italia, Orange, Huawei, Marvell | For e-mail approval. Rev2 Updated in S2-081008 |
S2‑080895 | Improvements to Alternative 2 for VCC for IMS Emergency Calls | Qualcomm Europe | Approved |
S2‑080896 | DT Emergency Call Flows for CS to PS | Nortel | Approved |
S2‑080897 | WITHDRAWN | - | - |
S2‑080898 | Extended Call Establishment for IMS Emergency Calls | Qualcomm Europe | Approved |
S2‑080899 | Draft LS on addressing suppression of services during Call Back from PSAP | SA WG2 (IMS SWG) | Revised in S2-080977 |
S2‑080900 | WITHDRAWN | - | - |
S2‑080901 | WITHDRAWN | - | - |
S2‑080902 | WITHDRAWN | - | - |
S2‑080903 | WITHDRAWN | - | - |
S2‑080904 | WITHDRAWN | - | - |
S2‑080905 | WITHDRAWN | - | - |
S2‑080906 | WITHDRAWN | - | - |
S2‑080907 | WITHDRAWN | - | - |
S2‑080908 | WITHDRAWN | - | - |
S2‑080909 | WITHDRAWN | - | - |
S2‑080910 | WITHDRAWN | - | - |
S2‑080911 | 23.402 CR0099R1: Principles for 3GPP-Mobile Wimax interworking | Drafting group | Approved |
S2‑080912 | 23.401 CR0065R2: Rate adaptation with "MBR>GBR bearers" | Ericsson | Approved |
S2‑080913 | LS on QoS Parameters via S1 | SA WG2 | Approved |
S2‑080914 | Draft LS on QoS Parameters via S1 | SA WG2 (Ericsson) | Revised in S2-080965 |
S2‑080915 | 23.402 CR0085R2: On IPMS solutions | Marvell, Telecom Italia, Qualcomm Europe | Revised in S2-080932 |
S2‑080916 | 23.402 CR0082R2: On IPMS on handover between accesses | Marvell, Qualcomm Europe, Telecom Italia | Approved |
S2‑080917 | 23.402 CR0090R4: Update on Serving GW selection procedures | Starent | Approved |
S2‑080918 | 23.401 CR0007R2: GTP-PMIP roaming | Ericsson | Approved |
S2‑080919 | 23.401 CR0060R2: Recommended QCI to DiffServ Code Point Mapping | Ericsson | Revised in S2-080937 |
S2‑080920 | 23.203 CR0094R2: Definitions for 23.203 | Samsung | Approved |
S2‑080921 | 23.203 CR0062R2: Role of the vPCRF | Ericsson | Approved |
S2‑080922 | 23.203 CR0066R2: Clarification for PCRF selection. | Huawei | Approved |
S2‑080923 | 23.203 CR0065R2: Rx reference point domain definition | Ericsson | Approved |
S2‑080924 | 23.203 CR0095R2: CR for PCRF selection in roaming scenario | ZTE | Approved |
S2‑080925 | 23.203 CR0096R2: CR for information storage in DRA | ZTE | Approved |
S2‑080926 | 23.402 CR0031R3: Relation of DSMIPv6 and 3GPP access | Nokia Siemens Networks, Nokia, Verizon Wireless, Ericsson, Huawei, ZTE, CATT, China Unicom | Approved |
S2‑080927 | 23.402 CR0043R2: Timing of PCC and PMIP Signalling at Handover | Motorola, Cisco, KDDI, Nokia Siemens Networks, Nortel | Approved |
S2‑080928 | 23.402 CR0073R2: PDN GW reallocation procedure for the S2c reference point | Telecom Italia, TeliaSonera | Approved |
S2‑080929 | 23.402 CR0066R2: MIPv4 FA CoA procedures for non-3GPP access to SAE | Samsung | Revised in S2-080970 |
S2‑080930 | 23.401 CR0111R1: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Revised in S2-080969 |
S2‑080931 | 23.402 CR0096R2: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Revised in S2-080968 |
S2‑080932 | 23.402 CR0085R3: On IPMS solutions | Marvell, Telecom Italia, Qualcomm Europe | Approved |
S2‑080933 | 23.402 CR0069R2: Clean up of handover procedures | ZTE | Approved |
S2‑080934 | 23.402 CR0055R2: Cleanup of Wa*, Wd*, Wx*, Wm* references points | Azaire Networks | Approved |
S2‑080935 | 23.402 CR0054R2: ePDG discovery during a handover from EUTRAN to untrusted non-3GPP access networks | Azaire Networks | Approved |
S2‑080936 | 23.402 CR0027R2: Principles of multiple PDN support in 23.402 | Huawei | Revised in S2-080971 |
S2‑080937 | 23.401 CR0060R3: Recommended QCI to DiffServ Code Point Mapping | Ericsson | Approved |
S2‑080938 | 23.401 CR0033R3: Several FFS clean-up | Huawei | Approved |
S2‑080939 | 23.401 CR0056R2: Selecting and signalling the security algorithms in handover from Rel-8 UTRAN to E-UTRAN | Nokia Siemens Networks, Nokia | Approved |
S2‑080940 | 23.401 CR0097R4: AMBR handling during HO | Nortel, Huawei | Approved |
S2‑080941 | 23.402 CR0044R2: Principles and Protocol Stack for S103 Interface | Motorola, Alcatel-Lucent, Cisco, Ericsson, Nokia Siemens Networks, Nortel, Verizon | Approved |
S2‑080942 | 23.402 CR0095R2: HRPD to EUTRAN handover call flows | Nortel, Verizon, NSN, Ericsson, Cisco, Alcatel-Lucent, Motorola | Approved |
S2‑080943 | 23.401 CR0026R3: Reserved for Magnus' drafting sessions | Huawei, CATT, NEC | Revised in S2-080951 |
S2‑080944 | 23.402 CR0079R3: Alignment of EUTRAN -> HRPD HO with updated inter S-GW HO | Nokia Siemens Networks, Nokia, Verizon, Ericsson, Motorola, Alcatel-Lucent, Cisco, Nortel, KDDI | Approved |
S2‑080945 | 23.401 CR0042R3: Reserved for Magnus' drafting sessions | Qualcomm Europe | Approved |
S2‑080946 | 23.401 CR0020R2: Inclusion of EIR reference point in SAE architecture | Ericsson | Approved |
S2‑080947 | LS on ETWS for Connected-Mode UE. | SA WG2 | Approved |
S2‑080948 | 23.401 CR0113: Reject TAU from 2G/3G if the UE has no PDP Context | Nortel, Ericsson | Approved |
S2‑080949 | 23.401 CR0011R3: Changes for Dual stack in GERAN/UTRAN | Ericsson | Revised in S2-080958 |
S2‑080950 | Draft LS on DHCP security in Rel8 | SA WG2 (Starent) | Revised in S2-080967 |
S2‑080951 | 23.401 CR0026R4: UE requested PDN disconnection procedure | Huawei, CATT, NEC | Revised in S2-080956 |
S2‑080952 | 23.401 CR0006R2: Update Network Triggered Service Request procedure with ISR functionality | Ericsson | Approved |
S2‑080953 | 23.401 CR0032R2: Correction of the MME Initiated Bearer procedures | Huawei | Approved |
S2‑080954 | LS on the need of charging characteristics | SA WG2 | Approved |
S2‑080955 | CT WG4 LS Response on Existence of GGSN in Rel8 | SA WG2 | Approved |
S2‑080956 | 23.401 CR0026R5: UE requested PDN disconnection procedure | Huawei, CATT, NEC | Approved |
S2‑080957 | LS on inter-MME load balancing, Attach/TAU/Service Request procedures and corresponding RRC/S1 connection establishment procedures | SA WG2 | Revised in S2-080991 |
S2‑080958 | 23.401 CR0011R4: Changes for Dual stack in GERAN/UTRAN | Ericsson | Approved |
S2‑080959 | 23.401 CR0001R3: Update of Attach procedure | Ericsson | Approved |
S2‑080960 | 23.402 CR0110R1: Mechanism to support reordering in EUTRAN | Ericsson | Approved |
S2‑080961 | Reply LS on mechanism to support reordering in target eNB | SA WG2 | Approved |
S2‑080962 | Liaison to 3GPP SA WG2 regarding a joint meeting in February 2008 | IEEE P802.11 (IEEE 802.11-08/0189r1) | Postponed to meeting #63 |
S2‑080963 | Reply LS Request for clarification and feedback on switching of the UL Tunnel Endpoint at X2 Handover | SA WG2 | Approved |
S2‑080964 | LS on QoS Characterization for LTE/EPS | SA WG2 | Approved |
S2‑080965 | Reply-LS on "subscriber type" indication via S1 | SA WG2 | Approved |
S2‑080966 | 23.401 CR0069R3: Update on IP address configuration procedures | Starent | Approved |
S2‑080967 | LS on DHCP security in Rel-8 | SA WG2 | Approved |
S2‑080968 | 23.402 CR0096R3: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Approved |
S2‑080969 | 23.401 CR0111R2: Context transfer information for PMIP-based CN node Relocation | Nortel, Verizon, Motorola, Samsung | Approved |
S2‑080970 | 23.402 CR0066R3: MIPv4 FA CoA procedures for non-3GPP access to SAE | Samsung | Approved |
S2‑080971 | 23.402 CR0027R3: Principles of multiple PDN support in 23.402 | Huawei | Approved |
S2‑080972 | SAE MBMS WID | China Mobile | Revised in S2-080988 |
S2‑080973 | 23.402 CR0038R2: PDN GW function | CATT | Approved |
S2‑080974 | 23.402 CR0114: Adding procedure for MME Initiated Bearer Modification with Bearer QoS Update to TS 23.402 | Motorola | Approved |
S2‑080975 | 23.402 CR0092R3: Updates in TS 23.402 for currently valid version of PMIPv6 draft | Nokia Siemens Networks, Nokia | Revised in S2-080993 |
S2‑080976 | Reply LS on completion of TR 24.880 and recommended architecture changes for AS/MRFC media control | SA WG2 | Approved |
S2‑080977 | LS on addressing suppression of services during Call Back from PSAP | SA WG2 | Approved |
S2‑080978 | 23.204 CR0055R1: Terminology corrections | Nokia Siemens Networks, Nokia | Approved |
S2‑080979 | 23.204 CR0047R2: SC address retrieval for IMS MO procedure | Huawei | Approved |
S2‑080980 | 23.204 CR0046R3: Call flow for IM to SMSIP interworking | Huawei | Approved |
S2‑080981 | 23.204 CR0054R3: Adding SMS to IM interworking procedures | Ericsson, Comverse, Qualcomm | Approved |
S2‑080982 | 23.204 CR0048R4: Procedure for the service level interworking in the terminating side in TS 23.204 | Huawei | Approved |
S2‑080983 | 23.221 CR0057R2: Any IP version support | Telecom Italia | Approved |
S2‑080984 | Reply to LS on Network Initiated PDP Context | SA WG2 | Approved |
S2‑080985 | New Work Item Description: System enhancements for the use of IMS services in local breakout | Telecom Italia, Marvell , LG Electronics , Verizon Wireless , Verizon , Alcatel-Lucent , BT , Vodafone , Nokia Siemens Networks , Nortel , Huawei , Motorola , Ericsson | Approved |
S2‑080986 | Update WID: Update to IMS LBO Study Item | Telecom Italia, Marvell, LG Electronics, Verizon Wireless, Verizon, Alcatel-Lucent, BT, Vodafone, Nokia Siemens Networks, Nortel, Huawei, Motorola, Ericsson | Approved |
S2‑080987 | New WID on IMS Service Continuity | LG Electronics, Huawei, Telecom Italia, Orange, BT, KDDI, NEC, Qualcomm Europe, SK Telecom, Telcordia, TOSHIBA, Marvell | Approved |
S2‑080988 | New WID: MBMS support for E-UTRAN | China Mobile | Approved |
S2‑080989 | 23.401 CR0016R2: Refinements to handover between non-3GPP and 3GPP accesses | Ericsson | Approved |
S2‑080990 | 23.401 CR0002R3: 3G to E-UTRAN IRAT Handover, non-3GDT support | Ericsson | Approved |
S2‑080991 | LS on inter-MME load balancing, Attach/TAU/Service Request procedures and corresponding RRC/S1 connection establishment procedures | SA WG2 | Approved |
S2‑080992 | WITHDRAWN (Incorrect file) | - | WITHDRAWN |
S2‑080993 | 23.402 CR0092R4: Updates in TS 23.402 for currently valid version of PMIPv6 draft | Nokia Siemens Networks, Nokia | Approved |
S2‑080994 | Reply LS on Optimal Media Routing for IMS Sessions Requirement | SA WG2 | Approved |
S2‑080995 | Reply on Reply LS on Area and Access Restrictions | SA WG2 | Approved |
S2‑080996 | Alternative solution for Local Breakout for IMS | Nortel, Verizon, Cisco | For e-mail approval. Rev4 Updated in S2-081008 |
S2‑080997 | Add CS fallback function (General section) | NTT DoCoMo, NEC | Approved |
S2‑080998 | Add CS fallback function (Reference Architecture) | NTT DoCoMo, NEC | Approved |
S2‑080999 | Add CS fallback function (Attach procedure) | NTT DoCoMo, NEC | Approved |
S2‑081000 | ICS and Service Continuity | Ericsson, Telecom Italia, LG Electronics | Approved |
S2‑081001 | Conclusions to TR 23.893 | LG Electronics, TOSHIBA, Huawei, Telecom Italia, Orange | Approved |
S2‑081002 | ICS Requirements: Service Consistency | AT&T, Nortel, Alcatel-Lucent | Approved |
S2‑081003 | Information flows for mobility of media components between different terminals | Motorola | Approved |
S2‑081004 | Information flows for media addition with redirection | Motorola | Approved |
S2‑081005 | Information flow modification for combined PS and CS origination | ZTE | Approved |
S2‑081006 | LS on MBMS Improvements in HSPA Architecture | SA WG2 | Approved |
S2‑081007 | Removing the Editor's Note regarding service data model conversion | Nokia, Nokia Siemens Networks | Approved |
S2‑081008 | Session Transfer triggered by the network and Session Transfer Operator Policy | LG Electronics, TOSHIBA, Telecom Italia, Orange, Huawei, Marvell | Approved |
S2‑081009 | Alternative solution for Local Breakout for IMS | Nortel, Verizon, Cisco, Qualcomm, Marvell | Approved |
page generated from database: 2024-04-22 07:58:53