The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R1-98 - 2019-10-14 to 2019-10-20, Chongqing

meeting id: R1-98 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R1‑1909940 Draft Agenda of RAN1#98bis meeting RAN1 Chair imported from 3GU
R1‑1909941 Highlights from RAN#85 RAN1 Chair imported from 3GU
R1‑1909942 Report of RAN1#98 meeting ETSI MCC imported from 3GU
R1‑1909943 Reply LS on channel quality report in connected mode for NB-IoT RAN2, Huawei imported from 3GU
R1‑1909944 LS on UL-SL prioritization RAN2, OPPO imported from 3GU
R1‑1909945 LS to on NR V2X cross-RAT configuration RAN2, CATT imported from 3GU
R1‑1909946 Reply LS on SFTD measurement RAN2, Huawei imported from 3GU
R1‑1909947 Reply LS on physical layer data rate of RAN-assisted codec adaptation RAN2, Huawei imported from 3GU
R1‑1909948 LS on O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs O-RAN Alliance, AT&T, CMCC imported from 3GU
R1‑1909949 LS on second SMTC periodicity in idle mode RAN2, Orange imported from 3GU
R1‑1909950 LS on the feasibility of Received Interference Power measurement RAN2, Huawei imported from 3GU
R1‑1909951 LS on single PDCCH-based multi-TRP operation RAN2, Samsung imported from 3GU
R1‑1909952 Reply LS on CSI-RS configuration transfer RAN2, ZTE imported from 3GU
R1‑1909953 LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities RAN2, ZTE imported from 3GU
R1‑1909954 LS on additional PDCCH monitoring occasions for paging for NR-U RAN2, ZTE imported from 3GU
R1‑1909955 LS to RAN1 on RAN2 agreements related to 2-step RACH RAN2, CATT imported from 3GU
R1‑1909956 Reply LS on LS on maximum value of MDBV RAN2, Qualcomm imported from 3GU
R1‑1909957 Reply LS on LS on maximum value of MDBV RAN3, Qualcomm imported from 3GU
R1‑1909958 Reply LS on measurement gap for SRS-RSRP or CLI-RSSI measurements RAN4, LG Electronics imported from 3GU
R1‑1909959 Reply LS on RAN1/4 feature lists RAN4, Intel Corporation imported from 3GU
R1‑1909960 Reply LS on simultaneous RX/TX  for NR RAN4, Ericsson imported from 3GU
R1‑1909961 Reply LS on maximum allowed SCell activation delay for Rel16 CA RAN4, Nokia imported from 3GU
R1‑1909962 Reply LS on OTA timing alignment for IAB RAN4, Samsung imported from 3GU
R1‑1909963 Reply to LS on DL channel quality report for configured carrier in RRC connected mode RAN4, Qualcomm Incorporated imported from 3GU
R1‑1909964 LS on signalling measurement thresholds for validating the TA for PUR RAN4, Ericsson imported from 3GU
R1‑1909965 LS reply on supported BW for initial BWP RAN4, Nokia imported from 3GU
R1‑1909966 LS on sidelink BWP reconfiguration on ITS band RAN4, MediaTek imported from 3GU
R1‑1909967 LS on RSSI definition RAN4, MediaTek imported from 3GU
R1‑1909968 Reply LS on NR fast Scell activation RAN4, Huawei imported from 3GU
R1‑1909969 LS on SS-RSRPB definition RAN4, Huawei imported from 3GU
R1‑1909970 Reply LS to LS on O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs SA, Intel imported from 3GU
R1‑1909971 Considerations on initial access signals and channels for NR-U ZTE, Sanechips imported from 3GU
R1‑1909972 Considerations on DL reference signals and channels design for NR-U ZTE, Sanechips imported from 3GU
R1‑1909973 Considerations on UL reference signals and channels design for NR-U ZTE, Sanechips imported from 3GU
R1‑1909974 Discussion on Channel access procedure for NR-U ZTE, Sanechips imported from 3GU
R1‑1909975 Discussion on enhancement of the initial access procedure for NR-U ZTE, Sanechips imported from 3GU
R1‑1909976 Discussion on scheduling and HARQ for NR-U ZTE, Sanechips imported from 3GU
R1‑1909977 Discussion on configured grant for NR-U ZTE, Sanechips imported from 3GU
R1‑1909978 Discussion on Wide-band operation for NR-U ZTE, Sanechips imported from 3GU
R1‑1909979 Draft Reply LS on additional PDCCH monitoring occasions for paging for NR-U ZTE, Sanechips imported from 3GU
R1‑1909980 Considerations on additional PDCCH monitoring occasions for paging for NR-U ZTE, Sanechips imported from 3GU
R1‑1909981 System level performance for NR-NTN phase 1 calibration MediaTek Inc. imported from 3GU
R1‑1909982 Physical layer control procedure in NR-NTN MediaTek Inc. imported from 3GU
R1‑1909983 PRACH design for NR-NTN scenario MediaTek Inc. imported from 3GU
R1‑1909984 Delay-tolerant re-transmission mechanisms MediaTek Inc. imported from 3GU
R1‑1909985 Link budget analysis of NR NTN MediaTek Inc. imported from 3GU
R1‑1909986 UE-group wake-up signal in LTE-MTC Ericsson imported from 3GU
R1‑1909987 Support for transmission in preconfigured UL resources in LTE-MTC Ericsson imported from 3GU
R1‑1909988 Scheduling of multiple DL/UL transport blocks in LTE-MTC Ericsson imported from 3GU
R1‑1909989 Coexistence of LTE-MTC with NR Ericsson imported from 3GU
R1‑1909990 Quality report in Msg3 and connected mode in LTE-MTC Ericsson imported from 3GU
R1‑1909991 MPDCCH performance improvement in LTE-MTC Ericsson imported from 3GU
R1‑1909992 CE mode improvements for LTE-MTC non-BL UEs Ericsson imported from 3GU
R1‑1909993 Use of LTE control channel region for DL transmission in LTE-MTC Ericsson imported from 3GU
R1‑1909994 Use of RSS for measurement improvements in LTE-MTC Ericsson imported from 3GU
R1‑1909995 UE-group wake-up signal in NB-IoT Ericsson imported from 3GU
R1‑1909996 Support for transmission in preconfigured UL resources in NB-IoT Ericsson imported from 3GU
R1‑1909997 Scheduling of multiple DL/UL transport blocks in NB-IoT Ericsson imported from 3GU
R1‑1909998 Coexistence of NB-IoT with NR Ericsson imported from 3GU
R1‑1909999 Quality report in Msg3 and connected mode in NB-IoT Ericsson imported from 3GU
R1‑1910000 Presence of NRS on a non-anchor carrier for paging in NB-IoT Ericsson imported from 3GU
R1‑1910001 Non-Periodic Scheduling Request Transmitter for NR Release 16: Additional Results and Considerations Idaho National Laboratory imported from 3GU
R1‑1910002 Reamaining isuses of msgA channel structure ZTE, Sanechips imported from 3GU
R1‑1910003 Remaining issues of 2-step RACH procedures ZTE, Sanechips imported from 3GU
R1‑1910004 Evaluation results for 2-step RACH ZTE, Sanechips imported from 3GU
R1‑1910005 Discussion on physical layer structure for sidelink Spreadtrum Communications imported from 3GU
R1‑1910006 Consideration on NR sidelink mode 1 resource allocation Spreadtrum Communications imported from 3GU
R1‑1910007 Discussion on NR sidelink Mode 2 resource allocation Spreadtrum Communications imported from 3GU
R1‑1910008 Discussion on synchronization mechanism for NR V2X Spreadtrum Communications imported from 3GU
R1‑1910009 Discussion on physical layer procedures for sidelink Spreadtrum Communications imported from 3GU
R1‑1910010 Considerations on sidelink congestion control Spreadtrum Communications imported from 3GU
R1‑1910011 Consideration on UE adaptation to maximum number of MIMO layers Spreadtrum Communications imported from 3GU
R1‑1910012 Wideband operation in NR-U Spreadtrum Communications imported from 3GU
R1‑1910013 Discussion on PDCCH-based power saving channel Spreadtrum Communications imported from 3GU
R1‑1910014 Discussion on DRS in NR-U Spreadtrum Communications imported from 3GU
R1‑1910015 Discussion on initial access and mobility in NR-U Spreadtrum Communications imported from 3GU
R1‑1910016 Discussion on 2-step RACH procedure Spreadtrum Communications imported from 3GU
R1‑1910017 Clarification on RAR search space configuration Spreadtrum Communications imported from 3GU
R1‑1910018 Discussion on cross-slot scheduling for UE power saving Spreadtrum Communications imported from 3GU
R1‑1910019 Discussion on PUSCH enhancements for URLLC Spreadtrum Communications imported from 3GU
R1‑1910020 Discussion on UL grant-free transmission enhancements for URLLC Spreadtrum Communications imported from 3GU
R1‑1910021 Discussion on DL SPS enhancements for URLLC Spreadtrum Communications imported from 3GU
R1‑1910022 Discussion on HARQ enhancements for NR-U Spreadtrum Communications imported from 3GU
R1‑1910023 Discussion on Multi-TRP transmission Spreadtrum Communications imported from 3GU
R1‑1910024 Discussion on multi-beam operation Spreadtrum Communications imported from 3GU
R1‑1910025 Discussion on full TX power for UL transmission Spreadtrum Communications imported from 3GU
R1‑1910026 Discussion on DL signals and channels for NR-U Spreadtrum Communications imported from 3GU
R1‑1910027 Discussion on PDCCH enhancements for URLLC Spreadtrum Communications imported from 3GU
R1‑1910028 Discussion on UCI enhancements for URLLC Spreadtrum Communications imported from 3GU
R1‑1910029 Discussion on UL Signals and Channels in NR-U Spreadtrum Communications imported from 3GU
R1‑1910030 Discussion on Type II CSI enhancement for MU-MIMO Spreadtrum Communications imported from 3GU
R1‑1910031 Discussion on channel structure of 2-step RACH Huawei, HiSilicon imported from 3GU
R1‑1910032 Discussion on 2-step RACH procedure Huawei, HiSilicon imported from 3GU
R1‑1910033 DL PRS design for NR positioning Huawei, HiSilicon imported from 3GU
R1‑1910034 SRS design for NR positioning Huawei, HiSilicon imported from 3GU
R1‑1910035 NR positioning measurements Huawei, HiSilicon imported from 3GU
R1‑1910036 Physical layer procedure for NR positioning Huawei, HiSilicon imported from 3GU
R1‑1910037 PHY aspects for DAPS-based HO Huawei, HiSilicon imported from 3GU
R1‑1910038 Potential PHY aspects from CHO Huawei, HiSilicon imported from 3GU
R1‑1910039 Discussion on low latency SCell activation and efficient SCell management Huawei, HiSilicon imported from 3GU
R1‑1910040 UL power control for NR-NR dual connectivity Huawei, HiSilicon imported from 3GU
R1‑1910041 Enhancements for single UL operation for EN-DC Huawei, HiSilicon imported from 3GU
R1‑1910042 Initial access signal and channels in NR unlicensed band Huawei, HiSilicon imported from 3GU
R1‑1910043 DL channels and signals in NR unlicensed band Huawei, HiSilicon imported from 3GU
R1‑1910044 UL channels and signals in NR unlicensed band Huawei, HiSilicon imported from 3GU
R1‑1910045 Coexistence and channel access for NR unlicensed band operations Huawei, HiSilicon imported from 3GU
R1‑1910046 Initial access procedure in NR unlicensed Huawei, HiSilicon imported from 3GU
R1‑1910047 HARQ enhancement in NR unlicensed Huawei, HiSilicon imported from 3GU
R1‑1910048 Transmission with configured grant in NR unlicensed band Huawei, HiSilicon imported from 3GU
R1‑1910049 NRU wideband BWP operation Huawei, HiSilicon imported from 3GU
R1‑1910050 SSB-based discovery and measurement for IAB Huawei, HiSilicon imported from 3GU
R1‑1910051 Resource multiplexing between backhaul and access in IAB Huawei, HiSilicon imported from 3GU
R1‑1910052 DL transmission timing alignment for IAB Huawei, HiSilicon imported from 3GU
R1‑1910053 On backhaul link radio link failure handling for IAB Huawei, HiSilicon imported from 3GU
R1‑1910054 Sidelink physical layer structure for NR V2X Huawei, HiSilicon imported from 3GU
R1‑1910055 Sidelink resource allocation mode 1 Huawei, HiSilicon imported from 3GU
R1‑1910056 Sidelink resource allocation mode 2 for NR V2X Huawei, HiSilicon imported from 3GU
R1‑1910057 Sidelink synchronization mechanisms for NR V2X Huawei, HiSilicon imported from 3GU
R1‑1910058 In-device coexistence between LTE and NR sidelinks Huawei, HiSilicon imported from 3GU
R1‑1910059 Sidelink physical layer procedures for NR V2X Huawei, HiSilicon imported from 3GU
R1‑1910060 QoS management for NR sidelink Huawei, HiSilicon imported from 3GU
R1‑1910061 NR Uu control for LTE sidelink Huawei, HiSilicon imported from 3GU
R1‑1910062 Discussion on performance evaluation for NTN Huawei, HiSilicon imported from 3GU
R1‑1910063 Discussion on physical layer control procedures for NTN Huawei, HiSilicon imported from 3GU
R1‑1910064 Discussion on Doppler compensation, timing advance and RACH for NTN Huawei, HiSilicon imported from 3GU
R1‑1910065 Discussion on HARQ for NTN Huawei, HiSilicon imported from 3GU
R1‑1910066 PDCCH enhancements for URLLC Huawei, HiSilicon imported from 3GU
R1‑1910067 UCI enhancements for URLLC Huawei, HiSilicon imported from 3GU
R1‑1910068 PUSCH enhancements for URLLC Huawei, HiSilicon imported from 3GU
R1‑1910069 Enhancements to scheduling/HARQ Huawei, HiSilicon imported from 3GU
R1‑1910070 UL inter-UE transmission prioritization and multiplexing Huawei, HiSilicon imported from 3GU
R1‑1910071 Enhanced UL configured grant transmission Huawei, HiSilicon imported from 3GU
R1‑1910072 Discussion on MU-CSI enhancements Huawei, HiSilicon imported from 3GU
R1‑1910073 Enhancements on multi-TRP/panel transmission Huawei, HiSilicon imported from 3GU
R1‑1910074 Enhancements on multi-beam operation Huawei, HiSilicon imported from 3GU
R1‑1910075 Remaining issues on full power transmission for UL MIMO Huawei, HiSilicon imported from 3GU
R1‑1910076 PDCCH-based power saving signal/channel Huawei, HiSilicon imported from 3GU
R1‑1910077 Procedure of cross-slot scheduling for UE power saving Huawei, HiSilicon imported from 3GU
R1‑1910078 UE dynamic adaptation to the maximum number of MIMO layer Huawei, HiSilicon imported from 3GU
R1‑1910079 Other considerations on UE power saving Huawei, HiSilicon imported from 3GU
R1‑1910080 Support of sub-groups for MWUS Huawei, HiSilicon imported from 3GU
R1‑1910081 UL transmission in preconfigured resource Huawei, HiSilicon imported from 3GU
R1‑1910082 Scheduling of multiple transport blocks Huawei, HiSilicon imported from 3GU
R1‑1910083 On eMTC co-existence with NR Huawei, HiSilicon imported from 3GU
R1‑1910084 Channel quality reporting in Msg3 Huawei, HiSilicon imported from 3GU
R1‑1910085 On MPDCCH performance improvement Huawei, HiSilicon imported from 3GU
R1‑1910086 Coverage enhancement for Non-BL UE Huawei, HiSilicon imported from 3GU
R1‑1910087 DL transmission on LTE control channel region Huawei, HiSilicon imported from 3GU
R1‑1910088 Considerations on RSS for measurement improvements Huawei, HiSilicon imported from 3GU
R1‑1910089 UE-group wake-up signal Huawei, HiSilicon imported from 3GU
R1‑1910090 Transmission in preconfigured UL resources Huawei, HiSilicon imported from 3GU
R1‑1910091 Scheduling of multiple DL/UL transport blocks Huawei, HiSilicon imported from 3GU
R1‑1910092 Performance enhancements for NB-IoT coexistence with NR Huawei, HiSilicon imported from 3GU
R1‑1910093 Support of quality report in Msg3 and connected mode Huawei, HiSilicon imported from 3GU
R1‑1910094 NRS presence on non-anchor carriers for paging Huawei, HiSilicon imported from 3GU
R1‑1910095 Remaining issues of additional SRS symbols in normal UL subframe Huawei, HiSilicon imported from 3GU
R1‑1910096 On RS pattern and TBS for the numerology to support rooftop Huawei, HiSilicon imported from 3GU
R1‑1910097 Potential enhancement for CAS Huawei, HiSilicon imported from 3GU
R1‑1910098 On MCS and TBS tables for the numerology to support mobility Huawei, HiSilicon imported from 3GU
R1‑1910099 Additional simulation results for CAS evaluation Huawei, HiSilicon imported from 3GU
R1‑1910100 On PDCCH enhancements for NR URLLC ZTE imported from 3GU
R1‑1910101 UL control enhancements for NR URLLC ZTE imported from 3GU
R1‑1910102 PUSCH enhancements for NR URLLC ZTE imported from 3GU
R1‑1910103 On scheduling/HARQ enhancements for NR URLLC ZTE imported from 3GU
R1‑1910104 UL inter-UE multiplexing between eMBB and URLLC ZTE imported from 3GU
R1‑1910105 Enhancements for UL configured grant transmission ZTE imported from 3GU
R1‑1910106 Other enhancements for Rel-16 URLLC ZTE imported from 3GU
R1‑1910107 Discussion on uplink power control for NR DC ZTE imported from 3GU
R1‑1910108 Discussion on single Tx switched uplink solution for EN-DC ZTE imported from 3GU
R1‑1910109 Discussion on low latency Scell activation ZTE imported from 3GU
R1‑1910110 Discussion on unaligned frame boundary for NR CA ZTE imported from 3GU
R1‑1910111 Remaining issues on cross-carrier scheduling ZTE imported from 3GU
R1‑1910112 Discussion on NR Mobility Enhancements in Physical Layer ZTE imported from 3GU
R1‑1910113 Draft response LS on ambiguity of UE L1 FDD&TDD FR1&FR2 capabilities ZTE imported from 3GU
R1‑1910114 RAN1 impact on switch between case1 and case2 for two uplink carriers ZTE imported from 3GU
R1‑1910115 Enhancements on type II CSI feedback OPPO imported from 3GU
R1‑1910116 Enhancements on multi-TRP and multi-panel transmission OPPO imported from 3GU
R1‑1910117 Discussion on Multi-beam Operation Enhancements OPPO imported from 3GU
R1‑1910118 Discussion on the Full TX power UL transmission OPPO imported from 3GU
R1‑1910119 Control signaling for multi-TRP based URLLC enhancement OPPO imported from 3GU
R1‑1910120 UL power control for NR-NR DC OPPO imported from 3GU
R1‑1910121 Discussion on DL Reference Signals for NR Positioning OPPO imported from 3GU
R1‑1910122 Discussion on UL Reference Signals for NR Positioning OPPO imported from 3GU
R1‑1910123 Discussion on Measurements for NR Positioning OPPO imported from 3GU
R1‑1910124 Discussion on Physical-layer procedures for NR Positioning OPPO imported from 3GU
R1‑1910125 Enable gNB to configure downgrading configuration of SRS for antenna switching OPPO imported from 3GU
R1‑1910126 Discussion on channel structure for 2-step RACH Fujitsu imported from 3GU
R1‑1910127 Discussion on procedure for 2-step RACH Fujitsu imported from 3GU
R1‑1910128 Considerations on RMSI and PRACH in NR-U Fujitsu imported from 3GU
R1‑1910129 DL signals and channels for NR-U Fujitsu imported from 3GU
R1‑1910130 UL signals and channels in NR-U Fujitsu imported from 3GU
R1‑1910131 Channel access procedure in NR-U Fujitsu imported from 3GU
R1‑1910132 Enhancements to initial access procedure for NR-U Fujitsu imported from 3GU
R1‑1910133 HARQ enhancements for NR-U Fujitsu imported from 3GU
R1‑1910134 Control Channel Design and its Efficient Transmission in NR-V2X Fujitsu imported from 3GU
R1‑1910135 Discussion on mode 1 resource allocation for NR V2X Fujitsu imported from 3GU
R1‑1910136 Dynamic Resource Selection for NR Sidelink Fujitsu imported from 3GU
R1‑1910137 Dynamic Sidelink Bi-mode Transmission under gNB Configuration Fujitsu imported from 3GU
R1‑1910138 Discussion of Sidelink synchronization mechanism for NR V2X Fujitsu imported from 3GU
R1‑1910139 Discussion on physical layer procedure for NR V2X Fujitsu imported from 3GU
R1‑1910140 Other aspects on physical layer structure for NR sidelink Fujitsu imported from 3GU
R1‑1910141 Discussion of additional SRS symbols Lenovo, Motorola Mobility imported from 3GU
R1‑1910142 Discussion of multi-panel/TRP transmission Lenovo, Motorola Mobility imported from 3GU
R1‑1910143 Discussion of multi-beam operation Lenovo, Motorola Mobility imported from 3GU
R1‑1910144 Discussion on physical layer structure for NR sidelink Lenovo, Motorola Mobility imported from 3GU
R1‑1910145 Discussion on resource allocation for NR sidelink Mode 1 Lenovo, Motorola Mobility imported from 3GU
R1‑1910146 Discussion on resource allocation for NR sidelink Mode 2 Lenovo, Motorola Mobility imported from 3GU
R1‑1910147 Discussion on physical layer procedures for NR sidelink Lenovo, Motorola Mobility imported from 3GU
R1‑1910148 RLM procedure Lenovo, Motorola Mobility imported from 3GU
R1‑1910149 UL transmission in preconfigured resources for MTC Lenovo, Motorola Mobility imported from 3GU
R1‑1910150 Design of scheduling of multiple DL/UL transport blocks for MTC Lenovo, Motorola Mobility imported from 3GU
R1‑1910151 UL transmission in preconfigured resources for NBIoT Lenovo, Motorola Mobility imported from 3GU
R1‑1910152 Design of scheduling of multiple DL/UL transport blocks for NBIoT Lenovo, Motorola Mobility imported from 3GU
R1‑1910153 Discussion on discovery and measurement for IAB network Lenovo, Motorola Mobility imported from 3GU
R1‑1910154 Discussion on resource partitioning for IAB network Lenovo, Motorola Mobility imported from 3GU
R1‑1910155 UL signals and channels for NR-U Lenovo, Motorola Mobility imported from 3GU
R1‑1910156 HARQ enhancement for NR-U Lenovo, Motorola Mobility imported from 3GU
R1‑1910157 Configured grant enhancement for NR-U Lenovo, Motorola Mobility imported from 3GU
R1‑1910158 Wide-band operation for NR-U Lenovo, Motorola Mobility imported from 3GU
R1‑1910159 Discussion on Channel Structure of 2-step RACH CMCC imported from 3GU
R1‑1910160 Discussion on Procdure of 2-step RACH CMCC imported from 3GU
R1‑1910161 Remaining issues on SSBs for inter-IAB-node discovery and measurements CMCC imported from 3GU
R1‑1910162 Discussion on resource multiplexing among backhaul and access links CMCC imported from 3GU
R1‑1910163 Discussion on mode-1 resource allocation for NR sidelink CMCC imported from 3GU
R1‑1910164 Discussion on HARQ feedback for NR V2X CMCC imported from 3GU
R1‑1910165 Considerations on Timing Advance for Non-Terrestrial Networks CMCC imported from 3GU
R1‑1910166 Considerations on HARQ for Non-Terrestrial Networks CMCC imported from 3GU
R1‑1910167 Discussion on UCI enhancements for URLLC CMCC imported from 3GU
R1‑1910168 Discussion on UL inter UE Tx prioritization/multiplexing CMCC imported from 3GU
R1‑1910169 Discussion on DL SPS enhancements CMCC imported from 3GU
R1‑1910170 Discussion on multi-TRP/panel transmission CMCC imported from 3GU
R1‑1910171 Enhancements on multi-beam operation CMCC imported from 3GU
R1‑1910172 Discussion on full Tx power UL transmission CMCC imported from 3GU
R1‑1910173 Discussion on PDCCH-based power saving signal/channel design CMCC imported from 3GU
R1‑1910174 Discussion on cross-slot scheduling procedure CMCC imported from 3GU
R1‑1910175 Discussion on UL MIMO layer configuration for power saving CMCC imported from 3GU
R1‑1910176 Discussion on DL positioning reference signal design CMCC imported from 3GU
R1‑1910177 Discussion on physical-layer procedures to support NR positioning measurements CMCC imported from 3GU
R1‑1910178 Correction on default PDSCH time domain resource allocation table CMCC imported from 3GU
R1‑1910179 RS design and other physical layerdesign issues for NR V2X sidelink Mitsubishi Electric RCE imported from 3GU
R1‑1910180 On synchronization procedures for NR V2X sidelink Mitsubishi Electric RCE imported from 3GU
R1‑1910181 Discussion on PDCCH-based power saving signal ZTE imported from 3GU
R1‑1910182 Procedure of cross-slot scheduling power saving techniques ZTE imported from 3GU
R1‑1910183 On UE Adaptation to Maximum Number of MIMO Layer ZTE imported from 3GU
R1‑1910184 Discussion on Potential Techniques for UE Power Saving ZTE imported from 3GU
R1‑1910185 Correction on PUCCH power control Sharp imported from 3GU
R1‑1910186 UCI enhancements for URLLC Fujitsu imported from 3GU
R1‑1910187 PUSCH enhancements for URLLC Fujitsu imported from 3GU
R1‑1910188 UL configured grant transmission enhancements for URLLC Fujitsu imported from 3GU
R1‑1910189 Discussion on DL SPS enhancement Fujitsu imported from 3GU
R1‑1910190 Enhancements on multi-TRP transmission Fujitsu imported from 3GU
R1‑1910191 Enhancements on multi-beam operation Fujitsu imported from 3GU
R1‑1910192 Discussion on the physical control procedure for NTN Pengcheng laboratory imported from 3GU
R1‑1910193 Discussion on timing advance and RACH for NTN Pengcheng laboratory imported from 3GU
R1‑1910194 Draft reply LS on mapping restriction for LCP procedure vivo imported from 3GU
R1‑1910195 Disucssion on remaining issues of additional SRS vivo imported from 3GU
R1‑1910196 Draft TS 38.213 CR on indication period in radio link monitoring vivo imported from 3GU
R1‑1910197 Draft TS 38.213 alignment CR for PUCCH resource set vivo imported from 3GU
R1‑1910198 Discussion on channel structure for 2-step RACH vivo imported from 3GU
R1‑1910199 Discussion on 2-step RACH procedure vivo imported from 3GU
R1‑1910200 Evaluation for 2-step RACH vivo imported from 3GU
R1‑1910201 Discussion on initial access signals and channles vivo imported from 3GU
R1‑1910202 Discussion on physical DL channel design in unlicensed spectrum vivo imported from 3GU
R1‑1910203 Discussion on physical UL channel design in unlicensed spectrum vivo imported from 3GU
R1‑1910204 Discussion on the channel access procedures vivo imported from 3GU
R1‑1910205 Discussion on initial access procedure for NR-U vivo imported from 3GU
R1‑1910206 Discussion on HARQ operation for NR-U vivo imported from 3GU
R1‑1910207 Discussion on the enhancements to configured grants vivo imported from 3GU
R1‑1910208 Discussion on wideband operation in NR-U vivo imported from 3GU
R1‑1910209 Discussion on extension of SSBs for inter-IAB-node discovery and measurements vivo imported from 3GU
R1‑1910210 Discussion on resource multiplexing among backhaul and access links vivo imported from 3GU
R1‑1910211 Physical layer structure for NR sidelink vivo imported from 3GU
R1‑1910212 Discussion on mode 1 resource allocation mechanism vivo imported from 3GU
R1‑1910213 Discussion on mode 2 resource allocation mechanism vivo imported from 3GU
R1‑1910214 Simultaneous configuration of Mode 1 and Mode 2 for transmitter UE vivo imported from 3GU
R1‑1910215 Sidelink synchronization mechanism vivo imported from 3GU
R1‑1910216 In-device coexistence between NR and LTE sidelinks vivo imported from 3GU
R1‑1910217 Physical layer procedure for NR sidelink vivo imported from 3GU
R1‑1910218 QoS management for sidelink vivo imported from 3GU
R1‑1910219 Support of NR Uu controlling LTE sidelink vivo imported from 3GU
R1‑1910220 Discussion on RLM in NR sidelink vivo imported from 3GU
R1‑1910221 PDCCH enhancements for URLLC vivo imported from 3GU
R1‑1910222 UCI enhancements for URLLC vivo imported from 3GU
R1‑1910223 PUSCH enhancements for URLLC vivo imported from 3GU
R1‑1910224 Enhancement for Scheduling/HARQ vivo imported from 3GU
R1‑1910225 UL inter UE Tx prioritization for URLLC vivo imported from 3GU
R1‑1910226 Enhanced UL configured grant transmissions for URLLC vivo imported from 3GU
R1‑1910227 Other issues for URLLC vivo imported from 3GU
R1‑1910228 Discussion on remaining issues of MU CSI enhancement vivo imported from 3GU
R1‑1910229 Discussion on remaining issues on multi TRP transmission vivo imported from 3GU
R1‑1910230 Discussion on remaining issues on multi beam enhancement vivo imported from 3GU
R1‑1910231 Discussion on remaining issues on UL full power Tx vivo imported from 3GU
R1‑1910232 Discussion on Rel-16 Multi-TRP vivo imported from 3GU
R1‑1910233 Remaining aspects of PDCCH-based power saving signal vivo imported from 3GU
R1‑1910234 Remaining aspects of cross-slot scheduling power saving techniques vivo imported from 3GU
R1‑1910235 Discussion on UE adaptation to maximum number of MIMO layers vivo imported from 3GU
R1‑1910236 Discussion on UE assistance information for power saving vivo imported from 3GU
R1‑1910237 Discussion on DL RS for NR positioning vivo imported from 3GU
R1‑1910238 Discussion on UL RS for NR positioning vivo imported from 3GU
R1‑1910239 Discussion on UE and gNB measurements for NR positioning vivo imported from 3GU
R1‑1910240 Discussion on physical-layer procedures for UE/gNB measurements vivo imported from 3GU
R1‑1910241 Uplink power control for supporting NR-NR DC vivo imported from 3GU
R1‑1910242 Fast Scell activation and dormancy like behavior vivo imported from 3GU
R1‑1910243 Discussion on aperiodic CSI-RS triggering vivo imported from 3GU
R1‑1910244 Discussion on unaligned frame boundary for CA vivo imported from 3GU
R1‑1910245 UE-group wake-up signal for MTC Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910246 Transmission in preconfigured UL resources Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910247 Scheduling of multiple DL/UL transport blocks Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910248 Coexistence of eMTC with NR Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910249 Support of Quality report in Msg3 Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910250 MPDCCH performance improvement Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910251 CE mode A and B improvements for non-BL UEs Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910252 Consideration on the usage of LTE control channel region Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910253 Potential RAN1 impact to support TDM switching between the 1Tx and 2Tx UL carriers vivo imported from 3GU
R1‑1910254 Use of RSS for measurement improvements Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910255 UE group wake-up signal for NB-IoT Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910256 Preconfigured Grant for Uplink transmission Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910257 Scheduling of multiple DL/UL transport blocks Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910258 Coexistence of NB-IoT with NR Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910259 Support of Quality report in Msg3 on non-anchor carrier Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910260 Presence of NRS on a non-anchor carrier for paging Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910261 Clarification on power headroom computation in NB-IoT ZTE imported from 3GU
R1‑1910262 Discussion on Wake-up signal for MTC ZTE imported from 3GU
R1‑1910263 Support for transmission in preconfigured UL resources for MTC ZTE imported from 3GU
R1‑1910264 Consideration on scheduling enhancement for MTC ZTE imported from 3GU
R1‑1910265 Coexistence of LTE-MTC with NR ZTE imported from 3GU
R1‑1910266 Support of quality report in Msg3 and Connected Mode for MTC ZTE imported from 3GU
R1‑1910267 Discussion on MPDCCH performance improvement ZTE imported from 3GU
R1‑1910268 On CE mode A and B improvements for non-BL UE ZTE imported from 3GU
R1‑1910269 Use of LTE control channel region for DL transmission ZTE imported from 3GU
R1‑1910270 Use of RSS for measurement improvement ZTE imported from 3GU
R1‑1910271 Discussion on Wake-up signal for NB-IoT ZTE imported from 3GU
R1‑1910272 Support for transmission in preconfigured UL resources for NB-IoT ZTE imported from 3GU
R1‑1910273 Consideration on scheduling enhancement for NB-IoT ZTE imported from 3GU
R1‑1910274 Coexistence of NB-IoT with NR ZTE imported from 3GU
R1‑1910275 Support of quality report in Msg3 and Connected Mode for NB-IoT ZTE imported from 3GU
R1‑1910276 Presense of NRS on non-anchor PRB ZTE imported from 3GU
R1‑1910277 On monitoring opportunity issue for PUSCH early termination ZTE imported from 3GU
R1‑1910278 Mode 1 resource allocation schemes on sidelink ZTE,Sanechips imported from 3GU
R1‑1910279 Mode 2 resource allocation schemes on sidelink ZTE,Sanechips imported from 3GU
R1‑1910280 Simulation of mode 2 resource schemes ZTE,Sanechips imported from 3GU
R1‑1910281 In-device coexistence between NR V2X and LTE V2X ZTE,Sanechips imported from 3GU
R1‑1910282 Discussion on NR Uu controlling LTE sidelink ZTE,Sanechips imported from 3GU
R1‑1910283 CSI Enhancement for MU-MIMO Support ZTE imported from 3GU
R1‑1910284 Enhancements on Multi-TRP and Multi-panel Transmission ZTE imported from 3GU
R1‑1910285 Enhancements on Multi-beam Operation ZTE imported from 3GU
R1‑1910286 Full TX Power UL transmission ZTE imported from 3GU
R1‑1910287 Further details on multi-beam/TRP operation ZTE imported from 3GU
R1‑1910288 Discussion on additional SRS symbols ZTE imported from 3GU
R1‑1910289 TEI proposal on aperiodic RS triggering offset ZTE imported from 3GU
R1‑1910290 Draft alignment CR on P0 index for PUCCH power control ZTE imported from 3GU
R1‑1910291 Cross-carrier CSI-RS triggering with mixed numerology ZTE imported from 3GU
R1‑1910292 Discussion on RSSI and CO measurements for NR-U ZTE, Sanechips imported from 3GU
R1‑1910293 Discussion on configurations for SSB Tx and Rx ZTE, Sanechips imported from 3GU
R1‑1910294 Resource multiplexing between backhaul and access links ZTE, Sanechips imported from 3GU
R1‑1910295 Discussion on OTA timing mechanism ZTE, Sanechips imported from 3GU
R1‑1910296 Summary of email discussion on case-1 timing after RAN1 #98 ZTE, Sanechips imported from 3GU
R1‑1910297 NR sidelink physical layer structure ZTE, Sanechips imported from 3GU
R1‑1910298 Discussion on synchronization mechanism in NR V2X ZTE, Sanechips imported from 3GU
R1‑1910299 Discussion on PHY procedures for sidelink ZTE, Sanechips imported from 3GU
R1‑1910300 Discussion on QoS management ZTE, Sanechips imported from 3GU
R1‑1910301 Discussion on AS level link management for unicast ZTE, Sanechips imported from 3GU
R1‑1910302 Discussion on UCI enhancement for URLLC Beijing Xiaomi Mobile Software imported from 3GU
R1‑1910303 Draft reply LS on single PDCCH-based multi-TRP operation ZTE imported from 3GU
R1‑1910304 DRAFT Reply LS on NR V2X resource pool configuration and selection vivo imported from 3GU
R1‑1910305 DRAFT Reply LS on UL-SL prioritization vivo imported from 3GU
R1‑1910306 Draft reply LS for RAN2 LS on additional PDCCH monitoring occasions for paging for NR-U vivo imported from 3GU
R1‑1910307 Discussions on RAN4 LS on RSSI definition vivo imported from 3GU
R1‑1910308 Draft reply LS on single PDCCH-based multi-TRP operation vivo imported from 3GU
R1‑1910309 Discussion on CM reduction for enhanced PRACH in NRU vivo imported from 3GU
R1‑1910310 Discussion on positioning in idle/inactive states vivo imported from 3GU
R1‑1910311 Correction on the simultaneous transmission of PRACH and PUCCH/PUSCH CATT imported from 3GU
R1‑1910312 Discussion on HARQ-ACK codebook determination with BWP switch CATT imported from 3GU
R1‑1910313 Correction on time gap definition for HARQ-ACK transmission CATT imported from 3GU
R1‑1910314 Correction on time gap definition for random access procedure CATT imported from 3GU
R1‑1910315 Correction on timing for MAC CE applicability with HARQ-ACK repetition in 38.214 CATT imported from 3GU
R1‑1910316 Correction on time duration for active BWP change CATT imported from 3GU
R1‑1910317 Correction on HARQ-ACK on PUCCH indicated by DCI before BWP change CATT imported from 3GU
R1‑1910318 DL Reference Signals for NR Positioning CATT imported from 3GU
R1‑1910319 UL Reference Signals for NR Positioning CATT imported from 3GU
R1‑1910320 UE and gNB measurements for NR Positioning CATT imported from 3GU
R1‑1910321 FL summary for 7.2.10.3 UE and gNB measurements for NR Positioning CATT imported from 3GU
R1‑1910322 Physical-layer procedures to support UE/gNB measurements CATT imported from 3GU
R1‑1910323 Network synchronization based on RAT-dependent signals CATT imported from 3GU
R1‑1910324 UL Power control for NR -DC CATT imported from 3GU
R1‑1910325 Triggering of Scell dormancy CATT imported from 3GU
R1‑1910326 Discussion on support of unaligned frame boundary inter-band CA CATT imported from 3GU
R1‑1910327 Physical layer structure for NR sidelink CATT imported from 3GU
R1‑1910328 Discussion on Mode 1 Resource allocation in NR V2X CATT imported from 3GU
R1‑1910329 Discussion on resource allocation mechanism for sidelink Mode 2 in NR V2X CATT imported from 3GU
R1‑1910330 Sidelink synchronization mechanism in NR V2X CATT imported from 3GU
R1‑1910331 In-device coexistence of LTE and NR sidelink CATT imported from 3GU
R1‑1910332 Sidelink physical layer procedures in NR V2X CATT imported from 3GU
R1‑1910333 QoS management in NR V2X CATT imported from 3GU
R1‑1910334 Disucssion on NR Uu controlling LTE sidelink CATT imported from 3GU
R1‑1910335 Radio link monitoring of sidelink unicast communication CATT imported from 3GU
R1‑1910336 Calibration results for NTN CATT imported from 3GU
R1‑1910337 Physical layer control procedure enhancement CATT imported from 3GU
R1‑1910338 PRACH design and UL timing management CATT imported from 3GU
R1‑1910339 Further consideration on HARQ operation CATT imported from 3GU
R1‑1910340 UE capability discussion for NTN CATT imported from 3GU
R1‑1910341 PDCCH enhancements for URLLC CATT imported from 3GU
R1‑1910342 UCI enhancements for URLLC CATT imported from 3GU
R1‑1910343 PUSCH enhancements for URLLC CATT imported from 3GU
R1‑1910344 Discussion on out-of-order scheduling/HARQ CATT imported from 3GU
R1‑1910345 Discussion on inter-UE UL multiplexing CATT imported from 3GU
R1‑1910346 Discussion on enhanced UL configured grant transmission CATT imported from 3GU
R1‑1910347 Discussion on PUSCH resource collision and DL SPS enhancement CATT imported from 3GU
R1‑1910348 Remaining issues on Type II CSI enhancement CATT imported from 3GU
R1‑1910349 Considerations on multi-TRP/panel transmission CATT imported from 3GU
R1‑1910350 Remaining issues on beam management enhancements in Rel.16 CATT imported from 3GU
R1‑1910351 Remaining issues on UL full power transmission CATT imported from 3GU
R1‑1910352 Text proposal of cross-slot scheduling for TS38.300 CATT imported from 3GU
R1‑1910353 Power saving signal/channel design and performance CATT imported from 3GU
R1‑1910354 Power saving scheme with cross-slot scheduling CATT imported from 3GU
R1‑1910355 Power saving scheme with UE adaptation to maximum MIMO layer CATT imported from 3GU
R1‑1910356 Draft CR on beta_offset values for UCI reporting in PUSCH ZTE imported from 3GU
R1‑1910357 Discussion on Type-2 HARQ-ACK codebook determination ZTE imported from 3GU
R1‑1910358 Draft CR on slot configuration regarding PUSCH scheduled by RAR UL grant ZTE imported from 3GU
R1‑1910359 Draft CR on configuration of CORESET and search space set ZTE imported from 3GU
R1‑1910360 Draft CR on Type-1 HARQ-ACK codebook ZTE imported from 3GU
R1‑1910361 Draft CR on HARQ-ACK transmission in case of UL BWP switching ZTE imported from 3GU
R1‑1910362 Preliminary simulation results for NTN ZTE imported from 3GU
R1‑1910363 Discussion on the physical control procedure for NTN ZTE imported from 3GU
R1‑1910364 Discussion on the TA and PRACH for NTN ZTE imported from 3GU
R1‑1910365 Delay-tolerant HARQ operation for NTN ZTE imported from 3GU
R1‑1910366 Consideration on the physical aspects for NTN ZTE imported from 3GU
R1‑1910367 TEI on TRS for FR1 CMCC imported from 3GU
R1‑1910368 Discussion on DL PRS for NR positioning ZTE Corporation imported from 3GU
R1‑1910369 Discussion on UL SRS for positioning ZTE Corporation,Sanechips imported from 3GU
R1‑1910370 Discussion on measurements for NR positioning ZTE Corporation imported from 3GU
R1‑1910371 Discussion on physical layer procedure for NR positioning ZTE Corporation imported from 3GU
R1‑1910372 Physical layer structure for NR-V2X OPPO imported from 3GU
R1‑1910373 Mode 1 resource allocation for NR SL OPPO imported from 3GU
R1‑1910374 Discussion of synchronization mechanism for NR-V2X OPPO imported from 3GU
R1‑1910375 Physical layer procedure for NR-V2X sidelink OPPO imported from 3GU
R1‑1910376 Discussion of RLM for Unicast OPPO imported from 3GU
R1‑1910377 Discussion on UL and SL prioritization for NR-V2X OPPO imported from 3GU
R1‑1910378 Draft reply LS on UL-SL prioritization OPPO imported from 3GU
R1‑1910379 Discussions on resource reservation, sensing and selection in Mode 2 OPPO imported from 3GU
R1‑1910380 On other aspects of mode 2 resource allocation OPPO imported from 3GU
R1‑1910381 Discussion on in-device coexistence OPPO imported from 3GU
R1‑1910382 Discussion on congestion control metrics and reporting OPPO imported from 3GU
R1‑1910383 On DCI signalling to control LTE sidelink and UE capability reporting OPPO imported from 3GU
R1‑1910384 On Procedure for 2-step RACH OPPO imported from 3GU
R1‑1910385 Further considerations on cross-slot scheduling for power saving OPPO imported from 3GU
R1‑1910386 NTN control procedure for physical layer OPPO imported from 3GU
R1‑1910387 NTN operation for Doppler and Timing Advance OPPO imported from 3GU
R1‑1910388 Delay-tolerant HARQ operation for NTN OPPO imported from 3GU
R1‑1910389 Discussion on efficient Scell operation OPPO imported from 3GU
R1‑1910390 Draft Reply LS on HARQ feedback in response to MsgB Huawei, HiSilicon imported from 3GU
R1‑1910391 [DRAFT] Reply LS on UL-SL prioritization Huawei imported from 3GU
R1‑1910392 Further discussion and evaluation results for 2-step RACH Huawei, HiSilicon imported from 3GU
R1‑1910393 Angle resolution and beam configuration related procedures for NR positioning Huawei, HiSilicon imported from 3GU
R1‑1910394 Remaining issues on cross-carrier scheduling with different numerologies Huawei, HiSilicon imported from 3GU
R1‑1910395 SLS evaluation of LBT for short control signaling Huawei, HiSilicon imported from 3GU
R1‑1910396 On RLM and RLF in NR V2X Huawei, HiSilicon imported from 3GU
R1‑1910397 Remaining design aspects for NTN Huawei, HiSilicon imported from 3GU
R1‑1910398 Other aspects for URLLC/IIOT enhancements Huawei, HiSilicon, SIA imported from 3GU
R1‑1910399 Other issues on NR eMIMO in R16 Huawei, HiSilicon imported from 3GU
R1‑1910400 Draft Reply LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities Huawei, HiSilicon imported from 3GU
R1‑1910401 Discussion on the relaxation of the frame timing for CA Huawei, HiSilicon imported from 3GU
R1‑1910402 Draft Reply LS on single PDCCH based multi-TRP operation Huawei, HiSilicon imported from 3GU
R1‑1910403 Draft Reply LS on additional PDCCH monitoring occasions for paging for NR-U Huawei, HiSilicon imported from 3GU
R1‑1910404 Introduction of configured PRG size for TM9 and TM10 in 36.213 Huawei, HiSilicon imported from 3GU
R1‑1910405 Correction on antenna switching parameter in UE sounding procedure in 36.213 Huawei, HiSilicon imported from 3GU
R1‑1910406 Increased peak data rate for HD-FDD MTC UEs Huawei, HiSilicon imported from 3GU
R1‑1910407 Discussion on Rel-15 LTE eMTC WUS Huawei, HiSilicon imported from 3GU
R1‑1910408 Correction on repetition number of MPDCCH with HARQ-ACK bundling Huawei, HiSilicon imported from 3GU
R1‑1910409 Physical layer structure for sidelink TCL Communication Ltd. imported from 3GU
R1‑1910410 Resource allocation for NR sidelink Mode 1 TCL Communication Ltd. imported from 3GU
R1‑1910411 Resource allocation for NR sidelink Mode 2 TCL Communication Ltd. imported from 3GU
R1‑1910412 Sidelink synchronization mechanism TCL Communication Ltd. imported from 3GU
R1‑1910413 Physical layer procedures for sidelink TCL Communication Ltd. imported from 3GU
R1‑1910414 Discussion on CBSR Solutions InterDigital, Inc. imported from 3GU
R1‑1910415 Details on Full Power Uplink Transmission InterDigital, Inc. imported from 3GU
R1‑1910416 Discussion on 2-step RACH Channel Structure InterDigital, Inc. imported from 3GU
R1‑1910417 Discussion on conditions of rate matching pattern overlapping with PDSCH DMRS symbols Huawei, HiSilicon imported from 3GU
R1‑1910418 On UE capabilities of FG2-36/2-40/2-41/2-43 Huawei,HiSilicon imported from 3GU
R1‑1910419 Correction on PUSCH scheduling with CSS for Case 1 HARQ timing Huawei, HiSilicon imported from 3GU
R1‑1910420 Correction on PRACH transmission for intra-band EN-DC Huawei, HiSilicon imported from 3GU
R1‑1910421 Correction on power control for NE-DC Huawei, HiSilicon imported from 3GU
R1‑1910422 Draft CR to TR 38.901 for remaining open issues in IIOT channel modelling Huawei, HiSilicon imported from 3GU
R1‑1910423 Correction of RSTD measurement for E-UTRA Huawei, HiSilicon imported from 3GU
R1‑1910424 Correction on timing-related UE capability parameters for L1-RSRP reporting in TS38.214 Huawei, HiSilicon imported from 3GU
R1‑1910425 Correction on SS-RSRPB measurement Huawei, HiSilicon imported from 3GU
R1‑1910426 Correction on interrupted transmission indication Huawei,HiSilicon imported from 3GU
R1‑1910427 Correction on PDCCH monitoring for Type0-PDCCH CSS Huawei,HiSilicon imported from 3GU
R1‑1910428 Correction on slot configurations Huawei,HiSilicon imported from 3GU
R1‑1910429 Discussion on UL Timing Advance and RACH Mitsubishi Electric RCE imported from 3GU
R1‑1910430 Discussion on 2-step RACH Procedure InterDigital, Inc. imported from 3GU
R1‑1910431 Non-Periodic Scheduling Request and Resolving NR SR Collisions Idaho National Laboratory imported from 3GU
R1‑1910432 Enhancements on UE multi-beam operation Fraunhofer IIS, Fraunhofer HHI imported from 3GU
R1‑1910433 Enhancements on Type-II CSI reporting Fraunhofer IIS, Fraunhofer HHI imported from 3GU
R1‑1910434 PBCH repetition for enhancement in the CAS Shanghai Jiao Tong University imported from 3GU
R1‑1910435 New numerology for PMCH to support rooftop reception Shanghai Jiao Tong University imported from 3GU
R1‑1910436 Correction to uplink power control in NE-DC NEC imported from 3GU
R1‑1910437 Correction to uplink power control in E-UTRA cells in EN-DC/NE-DC NEC imported from 3GU
R1‑1910438 Correction to reporting configurations NEC imported from 3GU
R1‑1910439 Discussion on PDCCH-based Power Saving Signal/Channel NEC imported from 3GU
R1‑1910440 Discussion on Initial Signals and Channels Charter Communications imported from 3GU
R1‑1910441 On Initial Access Procedure Aspects Charter Communications imported from 3GU
R1‑1910442 NR-U Channel Access Charter Communications imported from 3GU
R1‑1910443 [DRAFT] Reply LS to RAN 2 on single PDCCH-based multi-TRP operation Samsung imported from 3GU
R1‑1910444 [DRAFT] Reply LS on UL-SL prioritization Samsung imported from 3GU
R1‑1910445 [DRAFT] Reply LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities Samsung imported from 3GU
R1‑1910446 Discussion on transmission in preconfigured UL reosurces for MTC Samsung imported from 3GU
R1‑1910447 Discussion on quality report in Msg3 and connected mode Samsung imported from 3GU
R1‑1910448 Discussion on transmission in preconfigured UL reosurces for NB-IoT Samsung imported from 3GU
R1‑1910449 Discussion on Msg3 report for non-anchor access Samsung imported from 3GU
R1‑1910450 Discussion on additional SRS symbols Samsung imported from 3GU
R1‑1910451 Corrections to Contention Based Random Access Samsung imported from 3GU
R1‑1910452 Draft CR on simultaneous transmission of UL channels Samsung imported from 3GU
R1‑1910453 Channel Structure for Two-Step RACH Samsung imported from 3GU
R1‑1910454 Procedure for Two-step RACH Samsung imported from 3GU
R1‑1910455 Discussion on PUSCH validation and overlaping handling Samsung imported from 3GU
R1‑1910456 Initial access signals and channels for NR-U Samsung imported from 3GU
R1‑1910457 DL signals and channels for NR-U Samsung imported from 3GU
R1‑1910458 UL signals and channels for NR-U Samsung imported from 3GU
R1‑1910459 Channel access procedures for NR-U Samsung imported from 3GU
R1‑1910460 Initial access procedures for NR-U Samsung imported from 3GU
R1‑1910461 HARQ enhancement for NR-U Samsung imported from 3GU
R1‑1910462 Configured grant enhancement for NR-U Samsung imported from 3GU
R1‑1910463 Wide-band operation for NR-U Samsung imported from 3GU
R1‑1910464 Remaining issues for NR-U Samsung imported from 3GU
R1‑1910465 Support of SSBs for IAB Node Discovery and Measurement Samsung imported from 3GU
R1‑1910466 Resource Multiplexing between Backhaul and Access Links Samsung imported from 3GU
R1‑1910467 Support of Case 1 OTA Timing Alignment Samsung imported from 3GU
R1‑1910468 Discussion on Over-sized SIB1 Handling Samsung imported from 3GU
R1‑1910469 On Physical Layer Structures for NR V2X Samsung imported from 3GU
R1‑1910470 On Resource Allocation for NR V2X Mode 1 Samsung imported from 3GU
R1‑1910471 On Resource Allocation for NR V2X Mode 2 Samsung imported from 3GU
R1‑1910472 On Simultaneous Configuration of Mode 1 and Mode 2 Samsung imported from 3GU
R1‑1910473 On Synchronization Mechanisms for NR V2X Samsung imported from 3GU
R1‑1910474 On Coexistence between LTE and NR PC5 Samsung imported from 3GU
R1‑1910475 On Physical Layer Procedures for NR V2X Samsung imported from 3GU
R1‑1910476 On QoS Management for NR V2X Samsung imported from 3GU
R1‑1910477 On NR Uu controlling LTE sidelink Samsung imported from 3GU
R1‑1910478 On Sidelink RLM/RLF Samsung imported from 3GU
R1‑1910479 Link-Level and System-Level Evaluations Samsung imported from 3GU
R1‑1910480 Physical layer control procedures in NTN Samsung imported from 3GU
R1‑1910481 Uplink timing advance/RACH procedure and Initial Access for NTN Samsung imported from 3GU
R1‑1910482 HARQ procedure in NTN Samsung imported from 3GU
R1‑1910483 DL Control for URLLC Samsung imported from 3GU
R1‑1910484 UL Control for URLLC Samsung imported from 3GU
R1‑1910485 PUSCH enhancement for eURLLC Samsung imported from 3GU
R1‑1910486 Scheduling/HARQ enhancement for eURLLC Samsung imported from 3GU
R1‑1910487 UL Inter-UE Multiplexing/Prioritization Samsung imported from 3GU
R1‑1910488 UL configured grants for eURLLC Samsung imported from 3GU
R1‑1910489 Discussion for enhancements for IIoT Samsung imported from 3GU
R1‑1910490 CSI enhancement for MU-MIMO Samsung imported from 3GU
R1‑1910491 Feature lead summary for MU-MIMO CSI Samsung imported from 3GU
R1‑1910492 Feature lead summary for offline email discussion on UCI omission Samsung imported from 3GU
R1‑1910493 Enhancements on multi-TRP/panel transmission Samsung imported from 3GU
R1‑1910494 Enhancements on multi-beam operation Samsung imported from 3GU
R1‑1910495 View on full power UL transmission Samsung imported from 3GU
R1‑1910496 Other issues on Multi-TRP/panel transmission Samsung imported from 3GU
R1‑1910497 PDCCH-based power saving signal/channel Samsung imported from 3GU
R1‑1910498 Procedure of corss-slot scheduling power saving techniques Samsung imported from 3GU
R1‑1910499 UE adaptation to maximum number of MIMO layers Samsung imported from 3GU
R1‑1910500 On UE assistance information Samsung imported from 3GU
R1‑1910501 DL Reference Signals for NR Positioning Samsung imported from 3GU
R1‑1910502 UL Reference Signals for NR Positioning Samsung imported from 3GU
R1‑1910503 Discussion on UE and gNB measurements for NR Positioning Samsung imported from 3GU
R1‑1910504 Discussion on necessity and details for physical-layer procedures to support UE/gNB measurements Samsung imported from 3GU
R1‑1910505 Physical Layer Aspects for Mobility Enhancements Samsung imported from 3GU
R1‑1910506 Uplink Power Control for NR-NR DC Samsung imported from 3GU
R1‑1910507 Enhancements to Single Tx Switched UL for EN-DC Samsung imported from 3GU
R1‑1910508 On SCell Activation and Dormant SCells Samsung imported from 3GU
R1‑1910509 A-CSI-RS triggering by PDCCH with different numerology Samsung imported from 3GU
R1‑1910510 Unaligned frame boundary for CA Samsung imported from 3GU
R1‑1910511 Remaining Topics on CA and DC Samsung imported from 3GU
R1‑1910512 Discussion of Physical layer structure for sidelink Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910513 Discussion of Resource allocation for sidelink - Mode 1 Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910514 Discussion of Resource allocation for sidelink - Mode 2 Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910515 Discussion of Sidelink synchronization mechanism Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910516 Discussion of In-device coexistence between LTE and NR sidelinks Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910517 Discussion of Physical layer procedures for sidelink Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910518 Discussion of QoS management for sidelink Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910519 Discussion of NR Uu controlling LTE sidelink Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910520 Discussion of Sidelink RLM/RLF Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910521 On PUSCH enhancements for NR URLLC Panasonic imported from 3GU
R1‑1910522 On inter UE Tx prioritization/multiplexing enhancements for NR URLLC Panasonic imported from 3GU
R1‑1910523 On multi-TRP enhancements for NR MIMO in Rel. 16 Panasonic imported from 3GU
R1‑1910524 LTE-M Pre-configured UL Resources Design Considerations Sierra Wireless, S.A. imported from 3GU
R1‑1910525 NB-IOT Pre-configured UL Resources Design Considerations Sierra Wireless, S.A. imported from 3GU
R1‑1910526 LTE-M Multiple Transport Block Grant Design Considerations Sierra Wireless, S.A. imported from 3GU
R1‑1910527 NB-IOT Multiple Transport Block Grant Design Considerations Sierra Wireless, S.A. imported from 3GU
R1‑1910528 LTE-M Preconfigured UL Resources Feature Lead Summary RAN1 #98bis Sierra Wireless, S.A. imported from 3GU
R1‑1910529 UCI enhancements for NR URLLC NEC imported from 3GU
R1‑1910530 Enhanced inter-UE Tx prioritisation and multiplexing NEC imported from 3GU
R1‑1910531 Discussion on configured grant enhancement for NR-U NEC imported from 3GU
R1‑1910532 PHY layer structure for NR sidelink Ericsson imported from 3GU
R1‑1910533 Uu-based sidelink resource allocation Ericsson imported from 3GU
R1‑1910534 Resource allocation for Mode-2 transmissions Ericsson imported from 3GU
R1‑1910535 Miscellaneous issues on resource allocation Ericsson imported from 3GU
R1‑1910536 S-SSB design and synchronization protocol for NR SL Ericsson imported from 3GU
R1‑1910537 In-device coexistence between LTE and NR sidelinks Ericsson imported from 3GU
R1‑1910538 PHY layer procedures for NR sidelink Ericsson imported from 3GU
R1‑1910539 Congestion control for NR sidelink Ericsson imported from 3GU
R1‑1910540 NR Uu controlling LTE sidelink transmissions Ericsson imported from 3GU
R1‑1910541 On SL RLM and RLF in NR V2X for unicast Ericsson imported from 3GU
R1‑1910542 Summary of the use of RSS for measurement improvements Sony Europe B.V. imported from 3GU
R1‑1910543 FL Summary of 7.2.3.3 case-1 OTA timing alignment ZTE, Sanechips imported from 3GU
R1‑1910544 FL Summary of Channel Structure for 2-step RACH ZTE Corporation imported from 3GU
R1‑1910545 PDCCH Enhancements for NR URLLC Ericsson imported from 3GU
R1‑1910546 UCI Enhancements for NR URLLC Ericsson imported from 3GU
R1‑1910547 PUSCH Enhancements for NR URLLC Ericsson imported from 3GU
R1‑1910548 Scheduling/HARQ Enhancements for NR URLLC Ericsson imported from 3GU
R1‑1910549 Inter-UE Prioritization and Multiplexing of  UL Transmissions Ericsson imported from 3GU
R1‑1910550 Enhancements to UL Configured Grant Transmission for NR URLLC Ericsson imported from 3GU
R1‑1910551 Other Enhancements to Uplink and Downlink Transmissions for NR URLLC Ericsson imported from 3GU
R1‑1910552 Discussion of LS on Propagation Delay Compensation for Reference Time Information Delivery Ericsson imported from 3GU
R1‑1910553 Feature lead summary#1 on Resource allocation for NR sidelink Mode 1 Ericsson imported from 3GU
R1‑1910554 Design of NR V2X Physical Layer Structures Fraunhofer HHI, Fraunhofer IIS imported from 3GU
R1‑1910555 Resource Allocation for Mode 1 NR V2X Fraunhofer HHI, Fraunhofer IIS imported from 3GU
R1‑1910556 Resource Allocation for Mode 2 NR V2X Fraunhofer HHI, Fraunhofer IIS imported from 3GU
R1‑1910557 Physical Layer Procedures for NR V2X Fraunhofer HHI, Fraunhofer IIS imported from 3GU
R1‑1910558 channel access procedure for Cat 2 LBT by a UE KRRI imported from 3GU
R1‑1910559 Feature lead summary on NRU configured grant enhancement vivo imported from 3GU
R1‑1910560 Summary #1 of enhanced inter-UE Tx prioritization/multiplexing vivo imported from 3GU
R1‑1910561 Feature lead summary on UL full power TX vivo imported from 3GU
R1‑1910562 Summary of UE adaptation to maximum number of MIMO layers vivo imported from 3GU
R1‑1910563 UL signals and channels for NR-U Panasonic Corporation imported from 3GU
R1‑1910564 PRACH and paging resource enhancement for NR-U Panasonic Corporation imported from 3GU
R1‑1910565 Enhancements on Multi-beam Operation Panasonic Corporation imported from 3GU
R1‑1910566 Discussion on CSI Reporting NEC imported from 3GU
R1‑1910567 Discussion on multi-TRP operation NEC imported from 3GU
R1‑1910568 Discussion on multi-beam operation NEC imported from 3GU
R1‑1910569 In-device coexistence between LTE and NR sidelinks NEC imported from 3GU
R1‑1910570 Discussion on Qos management NEC imported from 3GU
R1‑1910571 HARQ enhancement for NR-U NEC imported from 3GU
R1‑1910572 Discussion on initial access signals and channels NEC imported from 3GU
R1‑1910573 Discussion on multi-TRP transmission NEC imported from 3GU
R1‑1910574 Discussion on Channel Structure for 2-step RACH LG Electronics imported from 3GU
R1‑1910575 Discussion on Procedure for 2-step RACH LG Electronics imported from 3GU
R1‑1910576 Discussion on designing 2-step RACH for NR-U LG Electronics imported from 3GU
R1‑1910577 Remaining issues on SSBs for inter-IAB-node discovery and measurements LG Electronics imported from 3GU
R1‑1910578 Discussions on resource multiplexing among backhaul and access links LG Electronics imported from 3GU
R1‑1910579 Discussions on OTA timing alignment LG Electronics imported from 3GU
R1‑1910580 Discussion on additional SRS symbols LG Electronics imported from 3GU
R1‑1910581 Discussion on overhead reduction for Type II codebook LG Electronics imported from 3GU
R1‑1910582 Enhancements on multi-TRP/panel transmission LG Electronics imported from 3GU
R1‑1910583 Discussion on multi-beam based operations and enhancements LG Electronics imported from 3GU
R1‑1910584 Discussion on full Tx power uplink transmission LG Electronics imported from 3GU
R1‑1910585 Discussion on power imbalance issue LG Electronics imported from 3GU
R1‑1910586 Discussion on DL Reference Signals for NR Positioning LG Electronics imported from 3GU
R1‑1910587 Discussion on UL Reference Signals for NR Positioning LG Electronics imported from 3GU
R1‑1910588 Discussion on UE and gNB measurements for NR Positioning LG Electronics imported from 3GU
R1‑1910589 Discussion on necessity and details for physical-layer procedures to support UE/gNB measurements LG Electronics imported from 3GU
R1‑1910590 Feature lead summary of Enhancements on Multi-beam Operations LG Electronics imported from 3GU
R1‑1910591 Channel access and co-existence for NR-U operation Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910592 Feature Lead’s Summary on Channel Access Procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910593 Discussion on additional PDCCH monitoring occasions for paging for NR-U Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910594 Remaining NR-U enhancements for uplink signals and channels Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910595 On support of UL transmission with configured grants in NR-U Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910596 Remaining issues on NR-U HARQ scheduling and feedback Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910597 Discussion on PDCCH-based power saving signal/channel (PoSS) Panasonic imported from 3GU
R1‑1910598 Discussion on procedure of cross-slot scheduling power saving techniques Panasonic imported from 3GU
R1‑1910599 MIMO layer adaptation for NR power saving Panasonic imported from 3GU
R1‑1910600 Wide-band operation for NR-U Fraunhofer HHI, Fraunhofer IIS imported from 3GU
R1‑1910601 Initial Access Signals and Channels for NR-U Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910602 On DL signals and channels Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910603 On wideband operation in NR-U Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910604 Efficient CA design Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910605 Discussion on coexistence of NB-IoT with NR CEWiT imported from 3GU
R1‑1910606 Draft TP towards Stage 2 CR on MR DC-CA enhancements Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910607 Uplink PC for NR-NR Dual Connectivity Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910608 PUCCH formats for 1Tx switched uplink operation for TDD EN-DC Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910609 On cross-carrier A-CSI-RS triggering with PDCCH of different SCS Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910610 Unaligned frame boundary with slot alignment and partial SFN alignment for inter-band CA Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910611 CCS: Increased number of DCIs Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910612 Draft 38.214 CR: Introduction of Cross-carrier Scheduling with Different Numerologies Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910613 FL Summary on cross-carrier scheduling with different SCS remaining issues Nokia imported from 3GU
R1‑1910614 On Enhancements to Initial Access Procedures for NR-U Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910615 Views on physical layer procedures for sidelink KT Corp. imported from 3GU
R1‑1910616 TR 37.985, “Overall description of Radio Access Network (RAN) aspects for Vehicle-to-everything (V2X) based on LTE and NR”, v0.2.0 Huawei imported from 3GU
R1‑1910617 QoS Management for NR sidelink Fraunhofer IIS, Fraunhofer HHI imported from 3GU
R1‑1910618 Discussion on RSSI Measurements for NR-U Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910619 PDCCH enhancements for URLLC OPPO imported from 3GU
R1‑1910620 UCI enhancements for URLLC OPPO imported from 3GU
R1‑1910621 PUSCH enhancements for URLLC OPPO imported from 3GU
R1‑1910622 Ehancements to scheduling and HARQ OPPO imported from 3GU
R1‑1910623 Inter UE Tx prioritization and multiplexing OPPO imported from 3GU
R1‑1910624 Configured grant enhancements for URLLC OPPO imported from 3GU
R1‑1910625 UL intra UE Tx prioritization and DL SPS OPPO imported from 3GU
R1‑1910626 Beam management enhancements for MPE Intel Corporation imported from 3GU
R1‑1910627 UE-group wake-up signal for eMTC Intel Corporation imported from 3GU
R1‑1910628 UL transmission in preconfigured resources for eMTC Intel Corporation imported from 3GU
R1‑1910629 Sceduling of multiple DL/UL TBs for eMTC Intel Corporation imported from 3GU
R1‑1910630 Quality report in Msg3 and connected mode for eMTC Intel Corporation imported from 3GU
R1‑1910631 Remaining details for additional SRS Intel Corporation imported from 3GU
R1‑1910632 Draft CR for 38.201 preferred mathematical notations Intel Corporation imported from 3GU
R1‑1910633 Discussion on TBS assumption for subband CQI Intel Corporation imported from 3GU
R1‑1910634 Discussion on channel structure for 2-step RACH Intel Corporation imported from 3GU
R1‑1910635 Discussion on procedure for 2-step RACH Intel Corporation imported from 3GU
R1‑1910636 Evaluation results for 2-step RACH Intel Corporation imported from 3GU
R1‑1910637 Initial access signals/channels for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910638 DL signals and channels for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910639 UL signals and channels for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910640 Channel access mechanism for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910641 Enhancements to initial access and mobility for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910642 Enhancements to HARQ for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910643 Enhancements to configured grants for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910644 Wideband operation for NR-unlicensed Intel Corporation imported from 3GU
R1‑1910645 SSBs for inter-IAB-node discovery and measurements Intel Corporation imported from 3GU
R1‑1910646 Mechanisms for resource multiplexing among backhaul and access links Intel Corporation imported from 3GU
R1‑1910647 Mechanism to support the "case-1" OTA timing alignment Intel Corporation imported from 3GU
R1‑1910648 Sidelink physical structure for NR V2X communication Intel Corporation imported from 3GU
R1‑1910649 Resource allocation mode-1 for NR V2X sidelink communication Intel Corporation imported from 3GU
R1‑1910650 Resource allocation mode-2 for NR V2X sidelink communication Intel Corporation imported from 3GU
R1‑1910651 Sidelink synchronization for NR V2X communication Intel Corporation imported from 3GU
R1‑1910652 Sidelink in-device coexistence solutions Intel Corporation imported from 3GU
R1‑1910653 Sidelink physical layer procedures for NR V2X communication Intel Corporation imported from 3GU
R1‑1910654 QoS aware congestion control for NR V2X communication Intel Corporation imported from 3GU
R1‑1910655 NR Uu control of LTE sidelink communication Intel Corporation imported from 3GU
R1‑1910656 Remaining issues on performance evaluation for NTN Intel Corporation imported from 3GU
R1‑1910657 On physical layer control procedures for NTN Intel Corporation imported from 3GU
R1‑1910658 Discussion on PRACH and TA for NTN Intel Corporation imported from 3GU
R1‑1910659 Discussion on HARQ for NTN Intel Corporation imported from 3GU
R1‑1910660 On PDCCH enhancements for URLLC Intel Corporation imported from 3GU
R1‑1910661 On UCI enhancements for URLLC Intel Corporation imported from 3GU
R1‑1910662 On PUSCH enhancements for URLLC Intel Corporation imported from 3GU
R1‑1910663 Scheduling & HARQ enhancements for URLLC Intel Corporation imported from 3GU
R1‑1910664 Enhancements to inter-UE multiplexing Intel Corporation imported from 3GU
R1‑1910665 Enhancements to UL configured grant transmission Intel Corporation imported from 3GU
R1‑1910666 On enhancements to DL SPS and support of TSC Intel Corporation imported from 3GU
R1‑1910667 Remaining details on CSI Enhancements for MU-MIMO Intel Corporation imported from 3GU
R1‑1910668 On multi-TRP/multi-panel transmission Intel Corporation imported from 3GU
R1‑1910669 Discussion on multi-beam enhancements Intel Corporation imported from 3GU
R1‑1910670 Remaining details of full Tx power UL transmission Intel Corporation imported from 3GU
R1‑1910671 Considerations on PDCCH-based power saving signal Intel Corporation imported from 3GU
R1‑1910672 On cross-slot scheduling operation for power saving Intel Corporation imported from 3GU
R1‑1910673 Discussion on UE adaptation to maximum number of MIMO layers Intel Corporation imported from 3GU
R1‑1910674 Remaining details of DL PRS design for NR positioning Intel Corporation imported from 3GU
R1‑1910675 Remaining details of UL PRS design for NR positioning Intel Corporation imported from 3GU
R1‑1910676 Remaining details of physical layer measurements for NR positioning Intel Corporation imported from 3GU
R1‑1910677 Remaining details of NR positioning physical layer procedures Intel Corporation imported from 3GU
R1‑1910678 Initial Discussion on UE Capabilities for NR Positioning WI Intel Corporation imported from 3GU
R1‑1910679 Physical layer aspects of enhanced mobility Intel Corporation imported from 3GU
R1‑1910680 Uplink power control for NN-DC Intel Corporation imported from 3GU
R1‑1910681 Discussions on single uplink solution for EN-DC Intel Corporation imported from 3GU
R1‑1910682 Discussion on fast SCell activation and deactivation Intel Corporation imported from 3GU
R1‑1910683 Discussions on aperiodic CSI-RS triggering with different numerology between CSI-RS and triggering PDCCH Intel Corporation imported from 3GU
R1‑1910684 Discussion on unaligned frame boundary for NR inter-band CA Intel Corporation imported from 3GU
R1‑1910685 Discussions on remaining issues on cross-carrier scheduling Intel Corporation imported from 3GU
R1‑1910686 Proposal for TEI: QCL Type D conflict between PDSCH and CSI-RS in FR2 Intel Corporation, Verizon Wireless, NTT DOCOMO, Ericsson imported from 3GU
R1‑1910687 Summary of discussion on physical layer aspects of NR mobility enhancement Intel Corporation imported from 3GU
R1‑1910688 Considerations on 2-step RACH channel structure Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910689 Remaining details of 2-step RACH Procedure Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910690 2-step RACH evaluation results Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910691 [Draft] Reply to LS on RAN2 agreements related to 2-step RACH Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910692 Email discussion [98-NR-08] on HARQ-ACK related issues for MsgB Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910693 Feature lead summary#1 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910694 Remaining Issues for NR Positioning Measurements Futurewei imported from 3GU
R1‑1910695 Remaining Issues for NR Positioning Procedures Futurewei imported from 3GU
R1‑1910696 Physical layer structure for the sidelink Futurewei imported from 3GU
R1‑1910697 Views on mode-1 resource allocation Futurewei imported from 3GU
R1‑1910698 Views on mode-2 resource allocation Futurewei imported from 3GU
R1‑1910699 Synchronization for sidelink Futurewei imported from 3GU
R1‑1910700 Physical procedures for sidelink Futurewei imported from 3GU
R1‑1910701 Support of NR Uu controlling LTE sidelink Futurewei imported from 3GU
R1‑1910702 Support of ProSe on the sidelink Futurewei imported from 3GU
R1‑1910703 DRAFT Reply LS on UL-SL prioritization Futurewei imported from 3GU
R1‑1910704 RLM/RLF for NR Sidelink Futurewei imported from 3GU
R1‑1910705 DRAFT LS on PSBCH content Futurewei imported from 3GU
R1‑1910706 Feature lead summary of support of NR Uu controlling LTE sidelink Futurewei imported from 3GU
R1‑1910707 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910708 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910709 Correction to HARQ-ACK delay Qualcomm Incorporated imported from 3GU
R1‑1910710 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910711 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910712 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910713 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910714 Introduction of new UE category Qualcomm Incorporated imported from 3GU
R1‑1910715 PUSCH frequency hopping configured with CE ModeB and flexible starting PRB allocation Qualcomm Incorporated imported from 3GU
R1‑1910716 UE-group wake-up signal Qualcomm Incorporated imported from 3GU
R1‑1910717 Support for transmission in preconfigured UL resources Qualcomm Incorporated imported from 3GU
R1‑1910718 Scheduling of multiple DL/UL transport blocks Qualcomm Incorporated imported from 3GU
R1‑1910719 Coexistence of LTE-MTC with NR Qualcomm Incorporated imported from 3GU
R1‑1910720 Support of Quality report in msg3 and connected mode Qualcomm Incorporated imported from 3GU
R1‑1910721 Usage of CRS for MPDCCH Qualcomm Incorporated imported from 3GU
R1‑1910722 CE Mode A and B improvements for non-BL Ues Qualcomm Incorporated imported from 3GU
R1‑1910723 Use of control region for eMTC UEs Qualcomm Incorporated imported from 3GU
R1‑1910724 Measurements based on RSS Qualcomm Incorporated imported from 3GU
R1‑1910725 UE-group wake-up signal Qualcomm Incorporated imported from 3GU
R1‑1910726 Support for transmission in preconfigured UL resources Qualcomm Incorporated imported from 3GU
R1‑1910727 Scheduling of multiple DL/UL transport blocks Qualcomm Incorporated imported from 3GU
R1‑1910728 Coexistence of NB-IoT with NR Qualcomm Incorporated imported from 3GU
R1‑1910729 Support of quality report in msg3 and connected mode Qualcomm Incorporated imported from 3GU
R1‑1910730 Presence of NRS on a non-anchor carrier for paging Qualcomm Incorporated imported from 3GU
R1‑1910731 Additional SRS symbols Qualcomm Incorporated imported from 3GU
R1‑1910732 Support of longer numerologies for rooftop reception Qualcomm Incorporated imported from 3GU
R1‑1910733 Analysis of CAS reception Qualcomm Incorporated imported from 3GU
R1‑1910734 Numerology with 100us CP Qualcomm Incorporated imported from 3GU
R1‑1910735 Increased peak data rate for HD-FDD MTC UEs Qualcomm Incorporated imported from 3GU
R1‑1910736 Clarification to postponing in subframes that are not BL/CE subframes Qualcomm Incorporated imported from 3GU
R1‑1910737 UE group wake up signal for MTC Sony imported from 3GU
R1‑1910738 Considerations in using PUR Sony imported from 3GU
R1‑1910739 On scheduling of multiple DL/UL transport blocks Sony imported from 3GU
R1‑1910740 Considerations in the support of quality report in Msg3 Sony imported from 3GU
R1‑1910741 Remaining issues in using RSS for neighbour cell measurements Sony imported from 3GU
R1‑1910742 UE group wake up signal for NB-IoT Sony imported from 3GU
R1‑1910743 Channel Structure for Two-Step RACH Sony imported from 3GU
R1‑1910744 Discussion on Procedure for 2-step RACH Sony imported from 3GU
R1‑1910745 System level simulation calibration and link budget analysis for NTN Sony imported from 3GU
R1‑1910746 Discussion on physical layer control procedures Sony imported from 3GU
R1‑1910747 Discussions on Timing adjustment in NTN Sony imported from 3GU
R1‑1910748 Discussion on delay-tolerant HARQ for NTN Sony imported from 3GU
R1‑1910749 Considerations on Multi-TRP/Panel Transmission Sony imported from 3GU
R1‑1910750 Enhancements on multi-beam operation Sony imported from 3GU
R1‑1910751 On PDCCH-based power saving signal / channel Sony imported from 3GU
R1‑1910752 On cross-slot scheduling for UE power saving Sony imported from 3GU
R1‑1910753 UE assistance information management for NR power saving Sony imported from 3GU
R1‑1910754 Considerations on DL Reference Signals for NR Positioning Sony imported from 3GU
R1‑1910755 Considerations on UL Reference Signals for NR Positioning Sony imported from 3GU
R1‑1910756 UE measurements for NR Positioning Sony imported from 3GU
R1‑1910757 Physical-layer procedures to support NR positioning Sony imported from 3GU
R1‑1910758 DL Signals and Channels for NR-U Sony imported from 3GU
R1‑1910759 Channel access for NR unlicensed operations Sony imported from 3GU
R1‑1910760 Enhancements to initial access procedures for NR-U Sony imported from 3GU
R1‑1910761 HARQ enhancement for NR-U Sony imported from 3GU
R1‑1910762 Enhancements to Configured Grants in NR-U Sony imported from 3GU
R1‑1910763 UL wideband operation for NR Unlicensed Sony imported from 3GU
R1‑1910764 Discussion on physical layer structure for NR sidelink Sony imported from 3GU
R1‑1910765 Discussion on mode 2 resource allocation for NR sidelink Sony imported from 3GU
R1‑1910766 Discussion on physical layer procedures for NR sidelink Sony imported from 3GU
R1‑1910767 Discussion on QoS management for sidelink Sony imported from 3GU
R1‑1910768 DCI Format for URLLC Sony imported from 3GU
R1‑1910769 UCI Enhancements for URLLC Sony imported from 3GU
R1‑1910770 PUSCH Enhancements for URLLC Sony imported from 3GU
R1‑1910771 Scheduling Enhancements for URLLC Sony imported from 3GU
R1‑1910772 UL Inter UE transmission prioritisation & multiplexing Sony imported from 3GU
R1‑1910773 Enhanced UL configured grant transmission for URLLC Sony imported from 3GU
R1‑1910774 Experimental results on beam based path loss measurements with indoor mobility National Instruments Corp. imported from 3GU
R1‑1910775 Discussion on channel structure for 2-step RACH Panasonic Corporation imported from 3GU
R1‑1910776 Discussion on 2-step RACH procedure Panasonic Corporation imported from 3GU
R1‑1910777 Discussion on physical layer structure for NR sidelink LG Electronics imported from 3GU
R1‑1910778 Discussion on resource allocation for Mode 1 LG Electronics imported from 3GU
R1‑1910779 Discussion on resource allocation for Mode 2 LG Electronics imported from 3GU
R1‑1910780 Discussion on simultaneous configuration of Mode 1 and Mode 2 for a UE LG Electronics imported from 3GU
R1‑1910781 Discussion on NR sidelink synchronization mechanism LG Electronics imported from 3GU
R1‑1910782 Discussion on in-device coexistence between LTE and NR sidelinks LG Electronics imported from 3GU
R1‑1910783 Discussion on physical layer procedure for NR sidelink LG Electronics imported from 3GU
R1‑1910784 Discussion on QoS management for NR sidelink LG Electronics imported from 3GU
R1‑1910785 Discussion on NR Uu controlling LTE sidelink LG Electronics imported from 3GU
R1‑1910786 Discussion on AS level link management for unicast LG Electronics imported from 3GU
R1‑1910787 Initial access signals/channels for NR-U OPPO imported from 3GU
R1‑1910788 DL signals and channels for NR-U OPPO imported from 3GU
R1‑1910789 UL signals and channels for NR-U OPPO imported from 3GU
R1‑1910790 Channel access procedures for NR-U OPPO imported from 3GU
R1‑1910791 Enhancements to initial access procedure for NR-U OPPO imported from 3GU
R1‑1910792 HARQ enhancements for NR-U OPPO imported from 3GU
R1‑1910793 On configured grant for NR-U OPPO imported from 3GU
R1‑1910794 Wideband operation for NR-U OPPO imported from 3GU
R1‑1910795 Discussion on subcarrier offset between SSB and CRB grid OPPO imported from 3GU
R1‑1910796 Physical layer structure for NR V2X ITL imported from 3GU
R1‑1910797 Physical layer procedure for NR V2X ITL imported from 3GU
R1‑1910798 On PDCCH enhancements for NR URLLC Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910799 On UCI Enhancements for NR URLLC Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910800 On PUSCH enhancements for NR URLLC Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910801 Updated Work Plan for NR Industrial IoT WI Nokia (Rapporteur) imported from 3GU
R1‑1910802 Discussion on UE-grouping wake up signal in MTC LG Electronics imported from 3GU
R1‑1910803 Discussion on preconfigured UL resources in MTC LG Electronics imported from 3GU
R1‑1910804 Discussion on multiple transport blocks scheduling in MTC LG Electronics imported from 3GU
R1‑1910805 Discussion on coexistence of LTE-MTC with NR LG Electronics imported from 3GU
R1‑1910806 Downlink channel quality report during random access procedure LG Electronics imported from 3GU
R1‑1910807 Discussion on MPDCCH performance improvement LG Electronics imported from 3GU
R1‑1910808 CE mode improvements for non-BL UEs LG Electronics imported from 3GU
R1‑1910809 FL summary of CE mode A and B improvements for non-BL UEs LG Electronics imported from 3GU
R1‑1910810 On the use of LTE control channel region for LTE-MTC DL transmission LG Electronics imported from 3GU
R1‑1910811 Use of RSS for measurement improvements LG Electronics imported from 3GU
R1‑1910812 Discussion on UE-grouping wake up signal in NB-IoT LG Electronics imported from 3GU
R1‑1910813 Discussion on preconfigured UL resources in NB-IoT LG Electronics imported from 3GU
R1‑1910814 Discussion on multiple transport blocks scheduling in NB-IoT LG Electronics imported from 3GU
R1‑1910815 Discussion on NRS on a non-anchor carrier LG Electronics imported from 3GU
R1‑1910816 Physical layer design of initial access signals and channels for NR-U LG Electronics imported from 3GU
R1‑1910817 Physical layer design of DL signals and channels for NR-U LG Electronics imported from 3GU
R1‑1910818 Physical layer design of UL signals and channels for NR-U LG Electronics imported from 3GU
R1‑1910819 Channel access procedure for NR-U LG Electronics imported from 3GU
R1‑1910820 Initial access and mobility for NR-U LG Electronics imported from 3GU
R1‑1910821 HARQ procedure for NR-U LG Electronics imported from 3GU
R1‑1910822 Discussion on configured grant for NR-U LG Electronics imported from 3GU
R1‑1910823 Wide-band operation for NR-U LG Electronics imported from 3GU
R1‑1910824 Summary on wide-band operation for NR-U LG Electronics imported from 3GU
R1‑1910825 Evaluation results of PRACH repetition in frequency domain for NR-U LG Electronics imported from 3GU
R1‑1910826 PDCCH enhancements for NR URLLC LG Electronics imported from 3GU
R1‑1910827 UCI enhancements for NR URLLC LG Electronics imported from 3GU
R1‑1910828 PUSCH enhancements for NR URLLC LG Electronics imported from 3GU
R1‑1910829 Enhancements to scheduling/HARQ for NR URLLC LG Electronics imported from 3GU
R1‑1910830 Discussion on UL inter UE Tx prioritization LG Electronics imported from 3GU
R1‑1910831 Enhanced UL configured grant transmission for NR URLLC LG Electronics imported from 3GU
R1‑1910832 Other aspects for URLLC/IIOT LG Electronics imported from 3GU
R1‑1910833 Summary of 7.2.6.7 others LG Electronics imported from 3GU
R1‑1910834 Discussion on PDCCH-based power saving signal/channel LG Electronics imported from 3GU
R1‑1910835 Discussion on cross-slot scheduling for power saving LG Electronics imported from 3GU
R1‑1910836 Discussion on UE adaptation to maximum number of MIMO layers LG Electronics imported from 3GU
R1‑1910837 HARQ related issues on single TX-switched UL operation for EN-DC LG Electronics imported from 3GU
R1‑1910838 Discussion on L1 based Scell dormancy LG Electronics imported from 3GU
R1‑1910839 Discussion on support of CA with unaligned frame boundary LG Electronics imported from 3GU
R1‑1910840 HARQ enhancement for NR-U Panasonic Corporation imported from 3GU
R1‑1910841 Discussion on physical layer structure for sidelink in NR V2X Panasonic Corporation imported from 3GU
R1‑1910842 Discussion on sidelink resource allocation in mode 2 for NR V2X Panasonic Corporation imported from 3GU
R1‑1910843 Discussion on physical layer procedures for sidelink in NR V2X Panasonic Corporation imported from 3GU
R1‑1910844 Discussion on delay-tolerant re-transmission mechanisms for NTN Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910845 Discussion on physical layer control procedures for NTN Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910846 Discussion on UL timing and RACH for NTN Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910847 Discussion on Multi-beam Operations Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910848 Discussion on SL Mode-1 Resource Allocation Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910849 PDCCH enhancements for NR URLLC Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910850 UCI enhancements for NR URLLC Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910851 Discussion on channel structure for 2-step RACH Asia Pacific Telecom co. Ltd imported from 3GU
R1‑1910852 Discussion on introduction of additional SRS symbols Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910853 Discussion on enhancements to scheduling/HARQ for NR URLLC Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910854 [98-NR-23] email discussion summary on CCS remaining issues Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910855 PUSCH enhancements for URLLC China Unicom imported from 3GU
R1‑1910856 PUSCH enhancements for URLLC China Unicom imported from 3GU
R1‑1910857 Discussion of Beam Failure Recovery for SCell China Unicom imported from 3GU
R1‑1910858 Considering on NR Sidelink Resource Allocations using Mode 1 ITRI imported from 3GU
R1‑1910859 Resource Allocation Mechanism for NR Sidelink Mode 2 ITRI imported from 3GU
R1‑1910860 Discussion on NR Sidelink Synchronization Issues and Mechanisms for 5G V2X ITRI imported from 3GU
R1‑1910861 Discussion on NR V2X Sidelink Physical Layer Procedures ITRI imported from 3GU
R1‑1910862 QoS management for sidelink congestion control ITRI imported from 3GU
R1‑1910863 Discussion on the physical control procedure for NTN Pengcheng laboratory imported from 3GU
R1‑1910864 Discussion on timing advance and RACH for NTN Pengcheng laboratory imported from 3GU
R1‑1910865 Remaining issues of mTRP Ericsson imported from 3GU
R1‑1910866 DRAFT LS response on single PDCCH-based multi-TRP operation Ericsson imported from 3GU
R1‑1910867 Clarification of PTRS port Ericsson imported from 3GU
R1‑1910868 UL inter-UE eMBB and URLLC multiplexing enhancements Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910869 On Enhanced UL Configured Grant Transmission for NR URLLC and activation/release of multiple SPS configurations Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910870 IIoT WI: Resource conflicts between UL grants, HARQ-ACK Enhancements for SPS and TSN time synchronization Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910871 Feature lead summary for Scheduling of multiple DL/UL transport blocks for LTE-MTC Ericsson imported from 3GU
R1‑1910872 Feature lead summary for Coexistence of LTE-MTC with NR Ericsson imported from 3GU
R1‑1910873 Feature lead summary for UE-group wake-up signal in NB-IoT Ericsson imported from 3GU
R1‑1910874 Feature lead summary for AI 7.2.4.5 Physical layer procedures for sidelink LG Electronics imported from 3GU
R1‑1910875 Consideration for scheduling multiple UL/DL TBs Sequans Communications imported from 3GU
R1‑1910876 Consideration for scheduling multiple UL/DL TBs Sequans Communications imported from 3GU
R1‑1910877 Consideration for preconfigured uplink resources (PUR) Sequans Communications imported from 3GU
R1‑1910878 Consideration for preconfigured uplink resources (PUR) Sequans Communications imported from 3GU
R1‑1910879 Correction of MWUS sequence design Ericsson, Verizon, SoftBank, Deutsche Telekom imported from 3GU
R1‑1910880 Proposals related to Rel-16 TEI Ericsson imported from 3GU
R1‑1910881 PDCCH-based power saving signal/channel Futurewei imported from 3GU
R1‑1910882 On assistance information for UE power saving Futurewei imported from 3GU
R1‑1910883 Feature lead summary of Support for transmission in preconfigured UL resources Futurewei imported from 3GU
R1‑1910884 Feature lead summary of Coexistence of NB-IoT with NR Futurewei imported from 3GU
R1‑1910885 Discussion on the remaining issues of transmission in preconfigured UL resources Xiaomi Communications imported from 3GU
R1‑1910886 Discussion on the remaining issues of scheduling of multiple DL/UL TBs Xiaomi Communications imported from 3GU
R1‑1910887 Views on DL reference signals for NR Positioning Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910888 Views on UL reference signals for NR Positioning Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910889 Measurements for NR Positioning Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910890 Views on Physical Layer Procedures for NR Positioning Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910891 Introduction of remote interference management Ericsson imported from 3GU
R1‑1910892 Remaining details for additional SRS symbols Ericsson imported from 3GU
R1‑1910893 Clarification for Type II port selection codebook Ericsson imported from 3GU
R1‑1910894 Clarification of transmission periodicity for semi-persistent CSI reporting on PUSCH Ericsson imported from 3GU
R1‑1910895 Correction of TDRA for CSI report without UL-SCH Ericsson imported from 3GU
R1‑1910896 Introduction of UE behaviour for SRS measurements for CLI Nokia imported from 3GU
R1‑1910897 On CSI enhancements for MU-MIMO Ericsson imported from 3GU
R1‑1910898 On support of aperiodic CSI-RS triggering with mixed numerology Ericsson imported from 3GU
R1‑1910899 Clarification on DCI formats monitoring Ericsson imported from 3GU
R1‑1910900 Determination of the number of reserved bits in DCI format 1_0 Ericsson imported from 3GU
R1‑1910901 SSB-based IAB node discovery and measurement Ericsson imported from 3GU
R1‑1910902 IAB resource configuration and multiplexing Ericsson imported from 3GU
R1‑1910903 IAB OTA Timing Alignment Ericsson imported from 3GU
R1‑1910904 Notification of July 2019 Coexistence Workshop Results IEEE 802.11 Working Group Chair imported from 3GU
R1‑1910905 Use Cases and Scenarios for 2-Step RACH Ericsson imported from 3GU
R1‑1910906 Channel Structure for Two-Step RACH Ericsson imported from 3GU
R1‑1910907 Procedure for Two-Step RACH Ericsson imported from 3GU
R1‑1910908 Performance and Design Details of 2-Step RACH Ericsson imported from 3GU
R1‑1910909 Scheme Details and Capabilities for Full Power UL Transmission Ericsson imported from 3GU
R1‑1910910 Channel Structure for Two-Step RACH Sierra Wireless, S.A. imported from 3GU
R1‑1910911 PDCCH-based Power Saving Signal Design InterDigital, Inc. imported from 3GU
R1‑1910912 On Cross-slot Scheduling for UE Power Saving InterDigital, Inc. imported from 3GU
R1‑1910913 MIMO Layer Adaptation for UE Power Saving InterDigital, Inc. imported from 3GU
R1‑1910914 On CSI enhancements for MU-MIMO: UCI parameters, omissions and codebook restrictions Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910915 Enhancements on Multi-TRP/Panel Transmission Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910916 Enhancements on Multi-beam Operation Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910917 On the full Tx power UL transmission Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1910918 On efficient and low latency low power serving cell operations Futurewei imported from 3GU
R1‑1910919 On multi-beam operation enhancements Futurewei imported from 3GU
R1‑1910920 Correction on resource allocation for uplink transmission with configured grant Type 1 Sharp imported from 3GU
R1‑1910921 Physical layer structure for NR sidelink Sharp imported from 3GU
R1‑1910922 Resource allocation mode 1 for NR sidelink Sharp imported from 3GU
R1‑1910923 Resource allocation mode 2 for NR sidelink Sharp imported from 3GU
R1‑1910924 Synchronization mechanism for NR sidelink Sharp imported from 3GU
R1‑1910925 Physical layer procedures for NR sidelink Sharp imported from 3GU
R1‑1910926 Initial access signals and channels for NR-U Sharp imported from 3GU
R1‑1910927 Downlink structure and procedure for NR-U operation Sharp imported from 3GU
R1‑1910928 UL signals and channels for NR-U Sharp imported from 3GU
R1‑1910929 Channel access procedure for NR-U Sharp imported from 3GU
R1‑1910930 Initial access procedure for NR-U Sharp imported from 3GU
R1‑1910931 HARQ enhancement for NR unlicensed operation Sharp imported from 3GU
R1‑1910932 Wideband operation and UL/DL indication for NR-U Sharp imported from 3GU
R1‑1910933 Discussion on PDCCH enhancements for NR eURLLC Sharp imported from 3GU
R1‑1910934 Remaining issues of UCI enhancements for eURLLC Sharp imported from 3GU
R1‑1910935 PUSCH enhancements for NR URLLC Sharp imported from 3GU
R1‑1910936 Discussion on enhancements to scheduling/HARQ Sharp imported from 3GU
R1‑1910937 UL cancelation indication design for enhanced inter UE Tx prioritization/multiplexing Sharp imported from 3GU
R1‑1910938 DL signals and channels for NR-U InterDigital, Inc. imported from 3GU
R1‑1910939 Channel access in NR-U InterDigital, Inc. imported from 3GU
R1‑1910940 Initial Access and Mobility Procedures in NR-U InterDigital, Inc. imported from 3GU
R1‑1910941 Enhanced dynamic HARQ codebook for NR-U InterDigital, Inc. imported from 3GU
R1‑1910942 Configured grant UCI for NR-U InterDigital, Inc. imported from 3GU
R1‑1910943 NR-U Wideband operation InterDigital, Inc. imported from 3GU
R1‑1910944 Initial access signals and channels Ericsson imported from 3GU
R1‑1910945 DL signals and channels for NR-U Ericsson imported from 3GU
R1‑1910946 UL signals and channels for NR-U Ericsson imported from 3GU
R1‑1910947 Channel access procedures Ericsson imported from 3GU
R1‑1910948 Enhancements to initial access procedure Ericsson imported from 3GU
R1‑1910949 HARQ and scheduling enhancements for NR-U Ericsson imported from 3GU
R1‑1910950 Configured grant enhancement Ericsson imported from 3GU
R1‑1910951 Wideband operation for NR-U Ericsson imported from 3GU
R1‑1910952 Evaluation results for enhanced PUCCH and PRACH designs Ericsson imported from 3GU
R1‑1910953 Draft CR on PDCCH QCL Assumption Apple Inc. imported from 3GU
R1‑1910954 Discussion on channel structure for 2-step RACH Apple Inc. imported from 3GU
R1‑1910955 Discussion on 2-step RACH procedure Apple Inc. imported from 3GU
R1‑1910956 UL signals and channels for NR-U Apple Inc. imported from 3GU
R1‑1910957 Enhancements to initial access procedure Apple Inc. imported from 3GU
R1‑1910958 On HARQ and scheduling enhancements for NR-U Apple Inc. imported from 3GU
R1‑1910959 Configuration grant enhancement Apple Inc. imported from 3GU
R1‑1910960 Discussion on NR V2X Physical Layer Structure Apple Inc. imported from 3GU
R1‑1910961 Discussion on Mode 1 Resource Allocation Apple Inc. imported from 3GU
R1‑1910962 On Mode 2 Resource Allocation for NR Sidelink Apple Inc. imported from 3GU
R1‑1910963 Remaining Issues on In-device Coexistence between NR and LTE Sidelinks Apple Inc. imported from 3GU
R1‑1910964 NR V2X Sidelink Physical Layer Procedures Apple Inc. imported from 3GU
R1‑1910965 On NR Uu Controlling LTE Sidelink Apple Inc. imported from 3GU
R1‑1910966 Further consideration on UCI enhancements for NR URLLC Apple Inc. imported from 3GU
R1‑1910967 Considerations for CSI Enhancement for MU-MIMO Apple Inc. imported from 3GU
R1‑1910968 Remaining Issues on Multi-TRP Enhancement Apple Inc. imported from 3GU
R1‑1910969 Remaining Issues on Multi-beam enhancement Apple Inc. imported from 3GU
R1‑1910970 Remaining Issues on Full TX Power UL transmission Apple Inc. imported from 3GU
R1‑1910971 Further considerations on beam management enhancement Apple Inc. imported from 3GU
R1‑1910972 PDCCH based power saving channel design for UE power saving Apple Inc. imported from 3GU
R1‑1910973 Cross Slot Scheduling Design for UE Power Saving Apple Inc. imported from 3GU
R1‑1910974 Maximum MIMO layer adaptation for UE power saving Apple Inc. imported from 3GU
R1‑1910975 Traffic aware UE power saving techniques with UE assistance Apple Inc. imported from 3GU
R1‑1910976 Discussion on NR mobility enhancements Apple Inc. imported from 3GU
R1‑1910977 Uplink power control for NR-NR Dual Connectivity Apple Inc. imported from 3GU
R1‑1910978 Remaining issues on enhancements to single Tx switched uplink solution for EN-DC Apple Inc. imported from 3GU
R1‑1910979 Time and Frequency Interleaver for LTE-based 5G Terrestrial Broadcast EBU, BBC, IRT imported from 3GU
R1‑1910980 On NTN link level and system level evaluations Ericsson imported from 3GU
R1‑1910981 On physical layer control procedures for NTN Ericsson imported from 3GU
R1‑1910982 On NTN synchronization, random access, and timing advance Ericsson imported from 3GU
R1‑1910983 On more delay tolerant retransmission mechanisms for NTN Ericsson imported from 3GU
R1‑1910984 On NTN PAPR reduction and measurement metrics Ericsson imported from 3GU
R1‑1910985 Discussion on PDCCH-based power saving signal/channel OPPO imported from 3GU
R1‑1910986 Discussion on UE adaptation to maximum number of MIMO layers OPPO imported from 3GU
R1‑1910987 On Channel Structure for 2-step RACH OPPO imported from 3GU
R1‑1910988 DL Reference Signals for NR Positioning BUPT imported from 3GU
R1‑1910989 PDCCH enhancements for NR URLLC Panasonic Corporation imported from 3GU
R1‑1910990 Discussion on UCI enhancement for URLLC Panasonic Corporation imported from 3GU
R1‑1910991 Discussion on scheduling/HARQ enhancement for URLLC Panasonic Corporation imported from 3GU
R1‑1910992 Discussion on URLLC enhancements for grant-free transmission Panasonic Corporation imported from 3GU
R1‑1910993 Discussion on DL SPS enhancement and resource conflicts involving CG PUSCH Panasonic Corporation imported from 3GU
R1‑1910994 Discussion on NR-U DRS design ETRI imported from 3GU
R1‑1910995 DL signals and channels for NR-U ETRI imported from 3GU
R1‑1910996 Enhancements to initial access procedure for NR-U ETRI imported from 3GU
R1‑1910997 Further views on wideband operation for NR-U ETRI imported from 3GU
R1‑1910998 Discussion on uplink timing advance for NTN ETRI imported from 3GU
R1‑1910999 UCI enhancements ETRI imported from 3GU
R1‑1911000 Enhanced inter UE Tx prioritization/multiplexing ETRI imported from 3GU
R1‑1911001 Configured grant enhancements for NR-U Panasonic Corporation imported from 3GU
R1‑1911002 System level evaluation and link budget for NTN Panasonic Corporation imported from 3GU
R1‑1911003 On physical layer control procedures for NTN Panasonic Corporation imported from 3GU
R1‑1911004 Timing advance and RACH for NTN Panasonic Corporation imported from 3GU
R1‑1911005 Discussion on HARQ for NTN Panasonic Corporation imported from 3GU
R1‑1911006 On Beam Failure Recovery for SCell Convida Wireless imported from 3GU
R1‑1911007 On Power Savings Using PDCCH Skipping Convida Wireless imported from 3GU
R1‑1911008 Draft CR on number of symbols for PUCCH power control Ericsson imported from 3GU
R1‑1911009 Design of PDCCH-WUS Ericsson imported from 3GU
R1‑1911010 Cross-slot scheduling technique Ericsson imported from 3GU
R1‑1911011 MIMO layers configuration per BWP Ericsson imported from 3GU
R1‑1911012 Other aspects of UE power saving Ericsson imported from 3GU
R1‑1911013 Power Control for NR-NR DC Ericsson imported from 3GU
R1‑1911014 Enhancements to single-tx operation for EN-DC Ericsson imported from 3GU
R1‑1911015 Reduced latency Scell management for NR CA Ericsson imported from 3GU
R1‑1911016 Inter-band CA with unaligned frame boundary Ericsson imported from 3GU
R1‑1911017 Remaining aspects for MR-DC including mixed numerology CCS and data rate handling for intra-FR DC Ericsson imported from 3GU
R1‑1911018 On out-of-order scheduling/HARQ for eURLLC III imported from 3GU
R1‑1911019 On DL SPS enhancements for IIoT III imported from 3GU
R1‑1911020 Remaining issues on SPDCCH RE mapping Samsung imported from 3GU
R1‑1911021 Draft CR on mapping of SPDCCH for TS36.211 Samsung imported from 3GU
R1‑1911022 Discussion on Mode 1 Resource Allocation ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911023 Discussion on sidelink physical layer procedure on NR V2X ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911024 Draft Reply LS on single PDCCH-based multi-TRP operation Futurewei imported from 3GU
R1‑1911025 Draft Reply LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities Futurewei imported from 3GU
R1‑1911026 Physical layer structure for NR sidelink NEC imported from 3GU
R1‑1911027 Mode 1 resource allocation mechanism for NR sidelink NEC imported from 3GU
R1‑1911028 Mode 2 resource allocation mechanism for NR sidelink NEC imported from 3GU
R1‑1911029 Synchronization mechanism for NR sidelink NEC imported from 3GU
R1‑1911030 Physical layer procedures for NR sidelink NEC imported from 3GU
R1‑1911031 Cross-slot scheduling for power saving Motorola Mobility, Lenovo imported from 3GU
R1‑1911032 UE adaptation to maximum number of MIMO layers Motorola Mobility, Lenovo imported from 3GU
R1‑1911033 Type II MU-CSI Enhancement Motorola Mobility, Lenovo imported from 3GU
R1‑1911034 Channel structure for 2-step RACH Motorola Mobility, Lenovo imported from 3GU
R1‑1911035 2-step RACH procedure Motorola Mobility, Lenovo imported from 3GU
R1‑1911036 UCI enhancement and intra-UE prioritization for URLLC Motorola Mobility, Lenovo imported from 3GU
R1‑1911037 PUSCH enhancement for URLLC Motorola Mobility, Lenovo imported from 3GU
R1‑1911038 Discussion on out-of-order scheduling and HARQ Motorola Mobility, Lenovo imported from 3GU
R1‑1911039 Monitoring of PDCCH-based power saving signal/channel Motorola Mobility, Lenovo imported from 3GU
R1‑1911040 Uplink power control for NR-NR DC Motorola Mobility, Lenovo imported from 3GU
R1‑1911041 LS Response on LS on MsgA Content Size Ericsson imported from 3GU
R1‑1911042 Alternatives and Performance for Ul Full Power Mode 1 Ericsson imported from 3GU
R1‑1911043 Draft CR for TS38.214 on CSI reporting with subband CQI MediaTek Inc. imported from 3GU
R1‑1911044 On UE feature group 3-5b MediaTek Inc. imported from 3GU
R1‑1911045 Draft CR on clarification on bit number of UL/SUL indicator in DCI format 0_1 MediaTek Inc. imported from 3GU
R1‑1911046 Enhancements on multi-TRP/panel transmission MediaTek Inc. imported from 3GU
R1‑1911047 Enhancements on Multi-beam Operation MediaTek Inc. imported from 3GU
R1‑1911048 Full Tx power UL transmission MediaTek Inc. imported from 3GU
R1‑1911049 On Initial Access Signals and Channels for NR-U MediaTek Inc. imported from 3GU
R1‑1911050 DL Signals and Channels for NR-U operation MediaTek Inc. imported from 3GU
R1‑1911051 UL Signals and Channels for NR-U operation MediaTek Inc. imported from 3GU
R1‑1911052 Discussion on channel access procedure MediaTek Inc. imported from 3GU
R1‑1911053 Enhancements to initial access procedure MediaTek Inc. imported from 3GU
R1‑1911054 Enhancements to HARQ for NR-U operation MediaTek Inc. imported from 3GU
R1‑1911055 Discussion on NR-U configured grant MediaTek Inc. imported from 3GU
R1‑1911056 Wideband operation for NR-U MediaTek Inc. imported from 3GU
R1‑1911057 Remaining details on power saving signal/channel MediaTek Inc. imported from 3GU
R1‑1911058 Remaining details for adaptation of cross-slot scheduling MediaTek Inc. imported from 3GU
R1‑1911059 Adaptation of maximum number of MIMO layers for UE Power Saving MediaTek Inc. imported from 3GU
R1‑1911060 On UL Power Control for NN-DC MediaTek Inc. imported from 3GU
R1‑1911061 Enhancements to Single UL Operations for EN-DC MediaTek Inc. imported from 3GU
R1‑1911062 Efficient and low latency SCell operations MediaTek Inc. imported from 3GU
R1‑1911063 Support of aperiodic CSI-RS triggering with different numerology between CSI-RS and triggering PDCCH MediaTek Inc. imported from 3GU
R1‑1911064 Remaining details on cross carrier scheduling MediaTek Inc. imported from 3GU
R1‑1911065 Discussion on sidelink physical layer structure MediaTek Inc. imported from 3GU
R1‑1911066 NR Sidelink Mode-1 resource allocation MediaTek Inc. imported from 3GU
R1‑1911067 On sidelink mode-2 resource allocation MediaTek Inc. imported from 3GU
R1‑1911068 Discussion on sidelink based synchronization mechanism MediaTek Inc. imported from 3GU
R1‑1911069 On in-device coexistence between LTE and NR sidelinks MediaTek Inc. imported from 3GU
R1‑1911070 Physical layer procedures for sidelink MediaTek Inc. imported from 3GU
R1‑1911071 Support of NR-Uu controlling LTE sidelink MediaTek Inc. imported from 3GU
R1‑1911072 Discussion on RLM for unicast MediaTek Inc. imported from 3GU
R1‑1911073 Downlink RS design for NR Positioning MediaTek Inc. imported from 3GU
R1‑1911074 Uplink RS design for NR Positioning MediaTek Inc. imported from 3GU
R1‑1911075 Measurement and reporting design for NR Positioning MediaTek Inc. imported from 3GU
R1‑1911076 Procedure design for NR Positioning MediaTek Inc. imported from 3GU
R1‑1911077 TEI for UE capability on PDCCH monitoring occasions for Case 2 with a span gap MediaTek Inc. imported from 3GU
R1‑1911078 PDCCH enhancements for eURLLC MediaTek Inc. imported from 3GU
R1‑1911079 Multiple HARQ procedures and intra-UE UCI prioritization MediaTek Inc. imported from 3GU
R1‑1911080 On repetition schemes for NR PUSCH MediaTek Inc. imported from 3GU
R1‑1911081 Enhancements to eURLLC scheduling/HARQ MediaTek Inc. imported from 3GU
R1‑1911082 On uplink inter-UE transmission prioritization and multiplexing MediaTek Inc. imported from 3GU
R1‑1911083 Enhancements for NR configured-grant MediaTek Inc. imported from 3GU
R1‑1911084 HARQ enhancements for NR-U ITRI imported from 3GU
R1‑1911085 Discussion on PUSCH enhancements for URLLC ITRI imported from 3GU
R1‑1911086 Enhancements on multi-TRP and multi-panel transmission ITRI imported from 3GU
R1‑1911087 Discussion on ambiguity of UE L1 FDD-TDD FR1-FR2 capabilities Qualcomm Incorporated imported from 3GU
R1‑1911088 Summary of email discussion [98-NR-05] NR timing ambiguity Qualcomm Incorporated imported from 3GU
R1‑1911089 Draft CR on 38.213 for cumulative TA Qualcomm Incorporated imported from 3GU
R1‑1911090 Draft CR on MAC-CE activation timing Qualcomm Incorporated imported from 3GU
R1‑1911091 Channel Structure for Two-Step RACH Qualcomm Incorporated imported from 3GU
R1‑1911092 Procedures for Two-step RACH Qualcomm Incorporated imported from 3GU
R1‑1911093 Other Considerations for Two-Step RACH Qualcomm Incorporated imported from 3GU
R1‑1911094 Initial access signals and channels for NR-U Qualcomm Incorporated imported from 3GU
R1‑1911095 DL signals and channels for NR-U Qualcomm Incorporated imported from 3GU
R1‑1911096 UL signals and channels for NR-U Qualcomm Incorporated imported from 3GU
R1‑1911097 Channel access procedures for NR unlicensed Qualcomm Incorporated imported from 3GU
R1‑1911098 Initial access and mobility procedures for NR-U Qualcomm Incorporated imported from 3GU
R1‑1911099 Enhancements to Scheduling and HARQ Operation for NR-U Qualcomm Incorporated imported from 3GU
R1‑1911100 Enhancements to configured grants for NR-U Qualcomm Incorporated imported from 3GU
R1‑1911101 Wideband operation for NR-U operation Qualcomm Incorporated imported from 3GU
R1‑1911102 Further topics on IAB resource management Qualcomm Incorporated imported from 3GU
R1‑1911103 Updated IAB node synchronization framework Qualcomm Incorporated imported from 3GU
R1‑1911104 Considerations on Physical Layer aspects of NR V2X Qualcomm Incorporated imported from 3GU
R1‑1911105 Mode 1 Resource allocation for NR-V2X Qualcomm Incorporated imported from 3GU
R1‑1911106 Sidelink Resource Allocation Mechanism for NR V2X Qualcomm Incorporated imported from 3GU
R1‑1911107 Synchronization design for NR V2X Qualcomm Incorporated imported from 3GU
R1‑1911108 Feature Lead summary of In-device Coexistence Aspects in NR-V2X (AI 7.2.4.4) Qualcomm Incorporated imported from 3GU
R1‑1911109 Co-existence aspects for NR-V2X and LTE-V2X Qualcomm Incorporated imported from 3GU
R1‑1911110 Physical layer procedures for sidelink Qualcomm Incorporated imported from 3GU
R1‑1911111 QoS management and congestion control for sidelink Qualcomm Incorporated imported from 3GU
R1‑1911112 NR Uu control of LTE sidelink Qualcomm Incorporated imported from 3GU
R1‑1911113 Evaluations of 2-rooted PRACH Preamble Qualcomm Incorporated imported from 3GU
R1‑1911114 Physical Layer Procedures for NTN Qualcomm Incorporated imported from 3GU
R1‑1911115 RACH Procedure and UL Timing Control for NTN Qualcomm Incorporated imported from 3GU
R1‑1911116 Delay-tolerant Retransmission Mechanisms for NTN Qualcomm Incorporated imported from 3GU
R1‑1911117 On NTN Initial Search and Handover Qualcomm Incorporated imported from 3GU
R1‑1911118 PDCCH Enhancements for eURLLC Qualcomm Incorporated imported from 3GU
R1‑1911119 UCI Enhancements for eURLLC Qualcomm Incorporated imported from 3GU
R1‑1911120 PUSCH enhancements for eURLLC Qualcomm Incorporated imported from 3GU
R1‑1911121 Enhancements to Scheduling and HARQ for eURLLC Qualcomm Incorporated imported from 3GU
R1‑1911122 Uplink Inter-UE Tx Multiplexing and Prioritization Qualcomm Incorporated imported from 3GU
R1‑1911123 Enhanced Grant-Free Transmissions for eURLLC Qualcomm Incorporated imported from 3GU
R1‑1911124 Remaining design details for URLLC downlink SPS Qualcomm Incorporated imported from 3GU
R1‑1911125 CSI enhancement for MU-MIMO support Qualcomm Incorporated imported from 3GU
R1‑1911126 Multi-TRP Enhancements Qualcomm Incorporated imported from 3GU
R1‑1911127 Enhancements on Multi-beam Operation Qualcomm Incorporated imported from 3GU
R1‑1911128 Full Tx power for UL transmissions Qualcomm Incorporated imported from 3GU
R1‑1911129 PDCCH-based power saving channel design Qualcomm Incorporated imported from 3GU
R1‑1911130 Cross-slot scheduling power saving techniques Qualcomm Incorporated imported from 3GU
R1‑1911131 Adaptation of maximum number of MIMO layers Qualcomm Incorporated imported from 3GU
R1‑1911132 DL Reference Signals for NR Positioning Qualcomm Incorporated imported from 3GU
R1‑1911133 UL Reference Signals for NR Positioning Qualcomm Incorporated imported from 3GU
R1‑1911134 UE and gNB measurements for NR Positioning Qualcomm Incorporated imported from 3GU
R1‑1911135 Considerations on Phy-layer procedures for NR Positioning Qualcomm Incorporated imported from 3GU
R1‑1911136 On NR mobility enhancements Qualcomm Incorporated imported from 3GU
R1‑1911137 Uplink Power Control Solutions for NR-NR Dual Connectivity Qualcomm Incorporated imported from 3GU
R1‑1911138 Enhancements for EN-DC Single-Tx TDM Operation Qualcomm Incorporated imported from 3GU
R1‑1911139 Fast SCell activation and SCell dormancy Qualcomm Incorporated imported from 3GU
R1‑1911140 A-CSI-RS with different numerology between CSI-RS and triggering PDCCH Qualcomm Incorporated imported from 3GU
R1‑1911141 Unaligned frame boundary with slot alignment and partial SFN alignment for R16 NR inter-band CA Qualcomm Incorporated imported from 3GU
R1‑1911142 Remaining issues on cross-carrier scheduling with different numerologies Qualcomm Incorporated imported from 3GU
R1‑1911143 Default PDSCH beam Qualcomm Incorporated imported from 3GU
R1‑1911144 Channel Structure for Two-Step RACH Qualcomm Incorporated imported from 3GU
R1‑1911145 Procedures for Two-step RACH Qualcomm Incorporated imported from 3GU
R1‑1911146 Open issues on SCell fast activation and deactivation ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911147 UE assistance information for power saving ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911148 PDCCH-based power saving signal/channel for UE adaptation ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911149 Discussion on UE-group wake up signal in eMTC NTT DOCOMO, INC. imported from 3GU
R1‑1911150 Discussion on preconfigured UL resources in eMTC NTT DOCOMO, INC. imported from 3GU
R1‑1911151 Discussion on coexistence of eMTC with NR NTT DOCOMO, INC. imported from 3GU
R1‑1911152 Discussion on UE-group wake up signal in NB-IoT NTT DOCOMO, INC. imported from 3GU
R1‑1911153 Discussion on preconfigured UL resources in NB-IoT NTT DOCOMO, INC. imported from 3GU
R1‑1911154 Summary on UE feature related discussion NTT DOCOMO, INC. imported from 3GU
R1‑1911155 Discussion on Channel Structure for Two-Step RACH NTT DOCOMO, INC. imported from 3GU
R1‑1911156 Discussion on Procedure for Two-step RACH NTT DOCOMO, INC. imported from 3GU
R1‑1911157 Initial access signals and channels for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911158 DL signals and channels for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911159 UL signals and channels for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911160 Channel access procedures for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911161 Enhancements to initial access procedure for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911162 HARQ enhancement for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911163 Configured grant enhancement for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911164 Wide-band operation for NR-U NTT DOCOMO, INC. imported from 3GU
R1‑1911165 Extensions of SSBs for inter-IAB-node discovery and measurements NTT DOCOMO, INC. imported from 3GU
R1‑1911166 Mechanisms for resource multiplexing among backhaul and access links NTT DOCOMO, INC. imported from 3GU
R1‑1911167 Mechanism to support the “case-1” OTA timing alignment NTT DOCOMO, INC. imported from 3GU
R1‑1911168 Sidelink physical layer structure for NR V2X NTT DOCOMO, INC. imported from 3GU
R1‑1911169 Sidelink resource allocation mechanism mode 1 for NR V2X NTT DOCOMO, INC. imported from 3GU
R1‑1911170 Sidelink resource allocation mechanism mode 2 for NR V2X NTT DOCOMO, INC. imported from 3GU
R1‑1911171 Sidelink synchronization mechanism for NR V2X NTT DOCOMO, INC. imported from 3GU
R1‑1911172 In-device coexistence for NR sidelink NTT DOCOMO, INC. imported from 3GU
R1‑1911173 Sidelink physical layer procedure for NR V2X NTT DOCOMO, INC. imported from 3GU
R1‑1911174 RLM/RLF for NR sidelink NTT DOCOMO, INC. imported from 3GU
R1‑1911175 PDCCH enhancements for URLLC NTT DOCOMO, INC. imported from 3GU
R1‑1911176 UCI enhancements for URLLC NTT DOCOMO, INC. imported from 3GU
R1‑1911177 PUSCH enhancements for URLLC NTT DOCOMO, INC. imported from 3GU
R1‑1911178 Enhancements to scheduling/HARQ for URLLC NTT DOCOMO, INC. imported from 3GU
R1‑1911179 UL inter-UE transmission prioritization/multiplexing NTT DOCOMO, INC. imported from 3GU
R1‑1911180 Remaining issues for enhanced configured grant transmission NTT DOCOMO, INC. imported from 3GU
R1‑1911181 Summary on URLLC enhanced configured grant transmission NTT DOCOMO, INC. imported from 3GU
R1‑1911182 Discussions on DL SPS enhancement NTT DOCOMO, INC. imported from 3GU
R1‑1911183 Type II CSI Enhancement for MU-MIMO Support NTT DOCOMO, INC. imported from 3GU
R1‑1911184 Enhancements on multi-TRP/panel transmission NTT DOCOMO, INC. imported from 3GU
R1‑1911185 Discussion on multi-beam enhancement NTT DOCOMO, INC. imported from 3GU
R1‑1911186 Full Tx Power UL transmission NTT DOCOMO, INC. imported from 3GU
R1‑1911187 Huffman Coding based Bitmap Compression Scheme for Type II CSI NTT DOCOMO, INC. imported from 3GU
R1‑1911188 Discussion on PDCCH-based power saving signal/channel NTT DOCOMO, INC. imported from 3GU
R1‑1911189 Discussion on procedure of cross-slot scheduling power saving techniques NTT DOCOMO, INC. imported from 3GU
R1‑1911190 DL Reference Signals for NR Positioning NTT DOCOMO, INC. imported from 3GU
R1‑1911191 Discussion on NR Rel-16 TEI for RACH configuration NTT DOCOMO, INC., Ericsson, SoftBank, Sharp imported from 3GU
R1‑1911192 Summary on NR Rel-16 TEI related discussion NTT DOCOMO, INC. imported from 3GU
R1‑1911193 Draft Reply LS on single PDCCH-based multi-TRP operation Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911194 Mechanisms for resource multiplexing among backhaul and access links Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911195 Open items with IAB Case #1 timing Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911196 Considerations on Channel Structure for Two-step RACH CAICT imported from 3GU
R1‑1911197 Considerations on Procedure for Two-step RACH CAICT imported from 3GU
R1‑1911198 Discussion on mechanisms for resource multiplexing among backhaul and access links CAICT imported from 3GU
R1‑1911199 Views on DL reference signal designs for NR positioning Mitsubishi Electric Co. imported from 3GU
R1‑1911200 Views on physical-layer procedures for NR positioning Mitsubishi Electric Co. imported from 3GU
R1‑1911201 Views on UL reference signal designs for NR positioning Mitsubishi Electric Co. imported from 3GU
R1‑1911202 Text proposals for Section 6.1 of TR38.821 THALES imported from 3GU
R1‑1911203 Correction on demodulation reference signal precoding for PUSCH codebook based Orange imported from 3GU
R1‑1911204 Uplink Tx switching between 1Tx and 2Tx carriers Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911205 UE FR2 MPE mitigation Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911206 38.214 CR - Clarification to the dynamically scheduled PDSCH collision with SPS-PDSCH Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911207 Remaining Details on Uplink PRS Signal Design Fraunhofer IIS, Fraunhofer HHI imported from 3GU
R1‑1911208 Discussion on sidelink structure in NR V2X ASUSTeK imported from 3GU
R1‑1911209 Enhancements on multi-TRP/panel transmission KDDI Corporation imported from 3GU
R1‑1911210 Discussion on Mode 2 resource allocation in NR V2X ASUSTeK imported from 3GU
R1‑1911211 Discussion on RLM in NR V2X ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911212 Discussion on DL signals and channels ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911213 Calibration results and link budget analysis THALES imported from 3GU
R1‑1911214 Calibration Results for NTN System-Level Evaluations Nomor Research GmbH imported from 3GU
R1‑1911215 Enhancements on Multi-TRP/Panel Transmission Beijing Xiaomi Electronics imported from 3GU
R1‑1911216 Enhancements on beam management Beijing Xiaomi Electronics imported from 3GU
R1‑1911217 Enhancements on multiple TRP or panel transmission ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911218 Performance Evaluation in NTN Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911219 Considerations on UL Power Control, AMC and CSI in NTN Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911220 Doppler Compensation, Uplink Timing Advance, Random Access and UE Location in NTN Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911221 Summary of 7.2.5.4 on more delay-tolerant re-transmission mechanisms in NR-NTN MediaTek Inc. imported from 3GU
R1‑1911222 Considerations on HARQ in NTN Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911223 Positioning in NTN Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911224 Remaining issues on multi-beam enhancements Ericsson imported from 3GU
R1‑1911225 Remaining issues on mobility enhancements Ericsson imported from 3GU
R1‑1911226 Lower-layer mobility enhancements Ericsson imported from 3GU
R1‑1911227 Addition of PRACH sequence generation parameter Ericsson imported from 3GU
R1‑1911228 DL reference signals for NR positioning Ericsson imported from 3GU
R1‑1911229 UL reference signals for NR positioning Ericsson imported from 3GU
R1‑1911230 UE and gNB measurements for NR positioning Ericsson imported from 3GU
R1‑1911231 Physical Layer procedures in NR positioning Ericsson imported from 3GU
R1‑1911232 On reusing the TRS for positioning purpose Ericsson imported from 3GU
R1‑1911233 Remaining issues on UCI enhancements for URLLC China Telecommunications imported from 3GU
R1‑1911234 Remaining issues on PUSCH enhancements for URLLC China Telecommunications imported from 3GU
R1‑1911235 Discussion on Multi-TRP/Panel Transmission enhancements China Telecommunications imported from 3GU
R1‑1911236 Enhancements on multi-beam operation China Telecommunications imported from 3GU
R1‑1911237 Discussions on resource multiplexing among backhaul and access links CEWiT imported from 3GU
R1‑1911238 [Draft] Reply LS on UL-SL prioritization Ericsson imported from 3GU
R1‑1911239 Introduction of cross layer interference measurements Intel Corporation (UK) Ltd imported from 3GU
R1‑1911240 Echo Delay Profile for Testing Receiver Performance in MBSFN EBU imported from 3GU
R1‑1911241 RMSI Transmission on Scell AT&T imported from 3GU
R1‑1911242 Wideband operation in NR unlicensed PANASONIC imported from 3GU
R1‑1911243 DL signals and channels for NR-U PANASONIC imported from 3GU
R1‑1911244 Discussion on pre-emption indication ASUSTEK COMPUTER (SHANGHAI) imported from 3GU
R1‑1911245 On PDCCH-based power saving techniques Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911246 Procedure of cross-slot scheduling power saving techniques Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911247 On adaptation of maximum number of MIMO layers Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911248 UE assistance information Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911249 Physical layer aspects of dual active protocol stack based HO Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911250 Enhancements to initial access procedure for NR-U KT Corp. imported from 3GU
R1‑1911251 38.213 CR - Clarification of QCL types for default QCL assumptions of CORESET Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911252 Considerations on Enhanced inter UE Tx prioritization/multiplexing KT Corp. imported from 3GU
R1‑1911253 Clarification for CSI-RS measurment in DRX Ericsson imported from 3GU
R1‑1911254 NTN link budget calibration: downlink and uplink numerical results ESA imported from 3GU
R1‑1911255 DL/UL LLS data transmission performance evaluation ESA imported from 3GU
R1‑1911256 UE-group wake-up signal for NB-IoT Intel Corporation imported from 3GU
R1‑1911257 UL transmission in preconfigured UL resources for NB-IoT Intel Corporation imported from 3GU
R1‑1911258 DL Frame Structure and COT Structure Aspects for NR-U Motorola Mobility, Lenovo imported from 3GU
R1‑1911259 Extensions for Channel Access Procedures Motorola Mobility, Lenovo imported from 3GU
R1‑1911260 Initial access procedure for NR-U Motorola Mobility, Lenovo imported from 3GU
R1‑1911261 Feature lead summary for NR-U DL Signals and Channels Lenovo, Motorola Mobility imported from 3GU
R1‑1911262 System level evaluations on sidelink resource allocation mode 2 for NR V2X Huawei, HiSilicon imported from 3GU
R1‑1911263 Clarification on PUCCHs and PUCCH or PUSCH overlapping Huawei, HiSilicon imported from 3GU
R1‑1911264 Discussion on NR time ambiguity Huawei, HiSilicon imported from 3GU
R1‑1911265 Discussion on aperiodic CSI-RS triggering with different numerologies between CSI-RS and triggering PDCCH Huawei, HiSilicon imported from 3GU
R1‑1911266 Discussion on the feasibility of received interference power measurement in NR Huawei, HiSilicon imported from 3GU
R1‑1911267 Correction on PRB bundle size in TS38.214 Huawei, HiSilicon imported from 3GU
R1‑1911268 Miscellaneous corrections for TS38.212 Huawei, HiSilicon imported from 3GU
R1‑1911269 Miscellaneous corrections in TS 38.211 Huawei, HiSilicon imported from 3GU
R1‑1911270 Correction on HARQ-ACK codebook determination Huawei, HiSilicon imported from 3GU
R1‑1911271 Correction on RACH occasion Huawei, HiSilicon imported from 3GU
R1‑1911272 Summary of 7.2.6.1 PDCCH enhancements Huawei imported from 3GU
R1‑1911273 Sidelink Physical Layer Structure Kyocera Corporation, Continental Automotive GmbH imported from 3GU
R1‑1911274 Sidelink Resource Allocation Mode 2 Kyocera Corporation imported from 3GU
R1‑1911275 Correction on demodulation reference signal precoding for PUSCH codebook based Orange imported from 3GU
R1‑1911276 Physical Layer Structure for NR V2X Sidelink InterDigital, Inc. imported from 3GU
R1‑1911277 NR Sidelink Mode 1 Resource Allocation InterDigital, Inc. imported from 3GU
R1‑1911278 NR Sidelink Mode 2 Resource Allocation InterDigital, Inc. imported from 3GU
R1‑1911279 In-device Coexistence between LTE and NR V2X Sidelinks InterDigital, Inc. imported from 3GU
R1‑1911280 Physical Layer Procedures for NR V2X Sidelink InterDigital, Inc. imported from 3GU
R1‑1911281 Congestion control and QoS Management for NR V2X InterDigital, Inc. imported from 3GU
R1‑1911282 On NR Uu Controlling LTE Sidelink InterDigital, Inc. imported from 3GU
R1‑1911283 Sidelink RLM/RLF for NR V2X InterDigital, Inc. imported from 3GU
R1‑1911284 Summary of 7.2.5.3 on UL timing and PRACH for NTN ZTE imported from 3GU
R1‑1911285 PDCCH enhancements for URLLC China Unicom imported from 3GU
R1‑1911286 Feature lead summary 1 of enhancements to initial access procedures Charter Communications, Inc imported from 3GU
R1‑1911287 Discussion on physical layer structure for 5G V2X Xiaomi Communications imported from 3GU
R1‑1911288 On Mode 1 resource allocation of V2x communications Xiaomi Communications imported from 3GU
R1‑1911289 On Mode 2 resource allocation of V2x communications Xiaomi Communications imported from 3GU
R1‑1911290 On Synchronization for 5G V2X Xiaomi Communications imported from 3GU
R1‑1911291 On procedures for 5G V2x communications Xiaomi Communications imported from 3GU
R1‑1911292 On NR-U initial access signals/channels Beijing Xiaomi Mobile Software imported from 3GU
R1‑1911293 Discussion on the DL signals and channels for NR-U Beijing Xiaomi Mobile Software imported from 3GU
R1‑1911294 Discussion on NR-U initial access procedure Beijing Xiaomi Mobile Software imported from 3GU
R1‑1911295 Discussion on HARQ enhancement for NR-U Beijing Xiaomi Mobile Software imported from 3GU
R1‑1911296 UCI Enhancements for eURLLC InterDigital, Inc. imported from 3GU
R1‑1911297 PUSCH Enhancements for eURLLC InterDigital, Inc. imported from 3GU
R1‑1911298 Enhancements to Scheduling/HARQ for eURLLC InterDigital, Inc. imported from 3GU
R1‑1911299 PDCCH enhancements for URLLC Motorola Mobility, Lenovo imported from 3GU
R1‑1911300 Enhanced inter UE Tx prioritization/multiplexing for URLLC Motorola Mobility, Lenovo imported from 3GU
R1‑1911301 HARQ-ACK feedback for enhanced DL SPS Motorola Mobility, Lenovo imported from 3GU
R1‑1911302 Enhancements to Initial Access Procedures for NR-U Potevio imported from 3GU
R1‑1911303 Discussion on sidelink synchronization mechanism for NR V2X ITL imported from 3GU
R1‑1911304 On HARQ procedure for NR sidelink Sequans Communications imported from 3GU
R1‑1911305 Sidelink synchronization mechanism for NR V2X Sequans Communications imported from 3GU
R1‑1911306 On NR sidelink physical layer structure Sequans Communications imported from 3GU
R1‑1911307 Considerations on UL inter-UE multiplexing for URLLC Sequans Communications imported from 3GU
R1‑1911308 Remaining issues for PUSCH enhancements Sequans Communications imported from 3GU
R1‑1911309 PDCCH enhancements for URLLC Sequans Communications imported from 3GU
R1‑1911310 Initial access signals and channels for NR-U WILUS Inc. imported from 3GU
R1‑1911311 UL signals and channels for NR-U WILUS Inc. imported from 3GU
R1‑1911312 Channel access procedure for NR-U WILUS Inc. imported from 3GU
R1‑1911313 Enhancement to initial access procedure for NR-U WILUS Inc. imported from 3GU
R1‑1911314 Wideband operation for NR-U WILUS Inc. imported from 3GU
R1‑1911315 On DCI enhancement for NR URLLC WILUS Inc. imported from 3GU
R1‑1911316 On UCI enhancement and intra-UE prioritization/multiplexing for NR URLLC WILUS Inc. imported from 3GU
R1‑1911317 On PUSCH enhancement for NR URLLC WILUS Inc. imported from 3GU
R1‑1911318 On UL cancellation scheme for NR URLLC WILUS Inc. imported from 3GU
R1‑1911319 Discussion on UL configured grant enhancements for NR URLLC WILUS Inc. imported from 3GU
R1‑1911320 On SPS PDSCH for NR URLLC WILUS Inc. imported from 3GU
R1‑1911321 Discussions on DL signals and channels design in NR-U CAICT imported from 3GU
R1‑1911322 Discussions on HARQ enhancements in NR-U CAICT imported from 3GU
R1‑1911323 Considerations on the resource allocation for NR sidelink Mode2 CAICT imported from 3GU
R1‑1911324 Considerations on procedures of NR Sidelink CAICT imported from 3GU
R1‑1911325 UCI enhancements for URLLC CAICT imported from 3GU
R1‑1911326 PUSCH enhancements for URLLC CAICT imported from 3GU
R1‑1911327 Enhanced inter UE Tx prioritization/multiplexing for URLLC CAICT imported from 3GU
R1‑1911328 Consideration on enhanced UL configured grant transmissions for URLLC CAICT imported from 3GU
R1‑1911329 Consideration on resources conflict involving multiple configured grant PUSCH CAICT imported from 3GU
R1‑1911330 Discussion on DL SPS enhancements CAICT imported from 3GU
R1‑1911331 Discussion on DL signals and channels in NR unlicensed Google imported from 3GU
R1‑1911332 Channel access procedures for NR unlicensed for FBE Convida Wireless imported from 3GU
R1‑1911333 Discussion on Resource Allocation for NR V2X Mode 1 Convida Wireless imported from 3GU
R1‑1911334 On Sidelink Resource Allocation Mode 2 Convida Wireless imported from 3GU
R1‑1911335 On Physical Layer Procedures for Sidelink Convida Wireless imported from 3GU
R1‑1911336 IS/OOS Indications for RLM/RLF Convida Wireless imported from 3GU
R1‑1911337 Enhanced Inter UE Transmit prioritization/multiplexing for eURLLC InterDigital, Inc. imported from 3GU
R1‑1911338 In-device coexistence between LTE and NR sidelinks Futurewei imported from 3GU
R1‑1911339 Feature lead summary#1 of HARQ enhancements for NR-U Huawei imported from 3GU
R1‑1911340 Summary of 6.2.1.1 UE group MWUS Qualcomm Incorporated imported from 3GU
R1‑1911341 Presence of NRS on a non-anchor for paging (feature lead summary) Qualcomm Incorporated imported from 3GU
R1‑1911342 Summary of email discussion on case-1 timing after RAN1 #98 ZTE, Sanechips imported from 3GU
R1‑1911343 SRS design for NR positioning Huawei, HiSilicon imported from 3GU
R1‑1911344 Feature lead summary#1 for agenda item 7.2.4.1 Physical layer structure for sidelink Samsung imported from 3GU
R1‑1911345 Summary of draft CRs on resource allocation and DCI content Ericsson imported from 3GU
R1‑1911346 Discussion on physical layer structure for NR sidelink LG Electronics imported from 3GU
R1‑1911347 Summary#1 for AI 7.2.4.2.2 V2X Mode-2 Resource Allocation Intel Corporation imported from 3GU
R1‑1911348 PBCH repetition for enhancement in the CAS Shanghai Jiao Tong University imported from 3GU
R1‑1911349 Summary#1 of efficient and low latency serving cell configuration/activation/setup Ericsson imported from 3GU
R1‑1911350 Correction to HARQ-ACK delay Qualcomm Incorporated imported from 3GU
R1‑1911351 Introduction of new UE category Qualcomm Incorporated imported from 3GU
R1‑1911352 Correction of MWUS sequence design Ericsson, Verizon, SoftBank, Deutsche Telekom, AT&T imported from 3GU
R1‑1911353 Summary on Multiple TB scheduling enhancement for NB-IoT ZTE, Sanechips imported from 3GU
R1‑1911354 Support for transmission in preconfigured UL resources Qualcomm Incorporated imported from 3GU
R1‑1911355 Time and Frequency Interleaver for LTE-based 5G Terrestrial Broadcast EBU, BBC, IRT imported from 3GU
R1‑1911356 Measurements based on RSS Qualcomm Incorporated imported from 3GU
R1‑1911357 Feature summary on LTE DL MIMO efficiency enhancement Huawei, HiSilicon imported from 3GU
R1‑1911358 Feature lead summary of MPDCCH performance Huawei, HiSilicon imported from 3GU
R1‑1911359 Support for transmission in preconfigured UL resources for MTC ZTE imported from 3GU
R1‑1911360 Support of longer numerologies for rooftop reception Qualcomm Incorporated imported from 3GU
R1‑1911361 Discussion on MPDCCH performance improvement ZTE imported from 3GU
R1‑1911362 Feature lead summary for support of quality report in Msg3 and connected mode Huawei imported from 3GU
R1‑1911363 Correction on repetition number of MPDCCH with HARQ-ACK bundling Huawei, HiSilicon imported from 3GU
R1‑1911364 Correction on repetition number of MPDCCH with HARQ-ACK bundling Huawei, HiSilicon imported from 3GU
R1‑1911365 Correction to HARQ-ACK delay Qualcomm Incorporated imported from 3GU
R1‑1911366 Correction to HARQ-ACK delay Qualcomm Incorporated imported from 3GU
R1‑1911367 Correction on antenna switching parameter in UE sounding procedure in 36.213 Huawei, HiSilicon imported from 3GU
R1‑1911368 Summary of Use of LTE Control Channel Region for DL Transmission Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911369 Feature lead summary of DL quality report for MTC Samsung imported from 3GU
R1‑1911370 Chairman's notes of AI 6.1.1 Maintenance of E-UTRA Release 8 – 14 Ad-hoc Chair (Ericsson) imported from 3GU
R1‑1911371 Chairman's notes of AI 6.1.2 Maintenance of E-UTRA Release 15 Ad-hoc Chair (Ericsson) imported from 3GU
R1‑1911372 Chairman's notes of AI 6.2.1 Additional MTC Enhancements Ad-hoc Chair (Samsung, NTT DOCOMO) imported from 3GU
R1‑1911373 Chairman's notes of AI 6.2.2 Additional Enhancements for NB-IoT Ad-hoc Chair (Samsung, NTT DOCOMO) imported from 3GU
R1‑1911374 Chairman's notes of AI 6.2.3 DL MIMO efficiency enhancements for LTE Ad-hoc Chair (Samsung) imported from 3GU
R1‑1911375 Chairman's notes of AI 6.2.4 LTE-based 5G Terrestrial Broadcast Ad-hoc Chair (Ericsson) imported from 3GU
R1‑1911376 Chairman's notes of AI 6.2.5 LTE Rel-16 TEIs Ad-hoc Chair (Ericsson) imported from 3GU
R1‑1911377 Summary of offline discussion on LTE-based 5G Terrestrial Broadcast Qualcomm Incorporated imported from 3GU
R1‑1911378 LTE-M Preconfigured UL Resources Summary #2 RAN1 #98bis Sierra Wireless imported from 3GU
R1‑1911379 PUSCH frequency hopping configured with CEModeB and flexible starting PRB allocation Qualcomm Incorporated imported from 3GU
R1‑1911380 Scheduling of multiple transport blocks Huawei, HiSilicon imported from 3GU
R1‑1911381 Feature lead summary #2 for Scheduling of multiple DL/UL transport blocks for LTE-MTC Ericsson imported from 3GU
R1‑1911382 Further topics in PUR transmission for NB-IoT Futurewei imported from 3GU
R1‑1911383 Further topics in coexistence of NB-IoT with NR Futurewei imported from 3GU
R1‑1911384 Further topics for UE-group wake-up signal in NB-IoT Ericsson imported from 3GU
R1‑1911385 Draft LS on channel quality report for LTE-M Samsung imported from 3GU
R1‑1911386 LS on channel quality report for LTE-M RAN1, Samsung imported from 3GU
R1‑1911387 Scheduling of multiple transport blocks Huawei, HiSilicon imported from 3GU
R1‑1911388 Follow Up Summary of the use of RSS for measurement improvements Sony imported from 3GU
R1‑1911389 Draft CR on SPDCCH monitoring for TS36.213 Samsung imported from 3GU
R1‑1911390 PUSCH frequency hopping configured with CEModeB and flexible starting PRB allocation Qualcomm Incorporated imported from 3GU
R1‑1911391 Summary on Multiple TB scheduling enhancement for NB-IoT ZTE, Sanechips imported from 3GU
R1‑1911392 Draft CR on SPDCCH monitoring for TS36.213 Samsung imported from 3GU
R1‑1911393 LS on PUR transmission for NB-IoT/eMTC Futurewei imported from 3GU
R1‑1911394 Increased peak data rate for HD-FDD MTC UEs Qualcomm Incorporated, Orange, Sierra Wireless, Verizon, Ericsson imported from 3GU
R1‑1911395 LS on PUR transmission for NB-IoT/eMTC Futurewei imported from 3GU
R1‑1911396 Correction on SPDCCH monitoring for TS 36.213 Samsung imported from 3GU
R1‑1911397 LS on support of high peak data rate for Cat-M1 UEs in HD-FDD Qualcomm Incorporated imported from 3GU
R1‑1911398 LS on support of high peak data rate for Cat-M1 UEs in HD-FDD RAN1, Qualcomm imported from 3GU
R1‑1911399 LS on PUR transmission for NB-IoT/eMTC RAN1, Futurewei imported from 3GU
R1‑1911400 Draft CR to TR 38.901 for remaining open issues in IIOT channel modelling Huawei, HiSilicon imported from 3GU
R1‑1911401 Summary of Draft CRs on CA and HARQ-ACK Codebook for Rel-15 NR Samsung imported from 3GU
R1‑1911402 Summary of contributions on PUSCH enhancements for NR eURLLC (AI 7.2.6.3) Nokia imported from 3GU
R1‑1911403 Non-Periodic Scheduling Request Transmitter for NR Release 16: Additional Results and Considerations Idaho National Laboratory imported from 3GU
R1‑1911404 Physical layer design of UL signals and channels for NR-U LG Electronics imported from 3GU
R1‑1911405 Channel Structure for Two-Step RACH Qualcomm Incorporated imported from 3GU
R1‑1911406 Procedures for Two-step RACH Qualcomm Incorporated imported from 3GU
R1‑1911407 Feature Lead Summary #1 for NR-V2X AI - 7.2.4.8 SL RLM/RLF InterDigital imported from 3GU
R1‑1911408 Summary of 7.2.3.1 Extensions of SSBs for inter-IAB-node discovery and measurements Huawei imported from 3GU
R1‑1911409 FL Summary on cross-carrier A-CSI RS triggering with different SCS Nokia imported from 3GU
R1‑1911410 FL Summary on support of unaligned frame boundary for R16 NR inter-band CA CMCC imported from 3GU
R1‑1911411 System level simulation calibration and link budget analysis for NTN Sony imported from 3GU
R1‑1911412 Summary of Rel.15 maintenance for PDCCH and search space Qualcomm Incorporated imported from 3GU
R1‑1911413 Summary of Rel.15 maintenance for scheduling and HARQ management Qualcomm Incorporated imported from 3GU
R1‑1911414 Reference constellation for inter satellite interference constellation Thales imported from 3GU
R1‑1911415 Summary of PDCCH-based power saving signal/channel CATT imported from 3GU
R1‑1911416 Summary of 7.2.10.4: PHY procedures for positioning measurements Qualcomm Incorporated imported from 3GU
R1‑1911417 Statement Regarding Engagement with Companies Added to the U.S. Export Administration Regulations (EAR) Entity List in 3GPP Activities RAN1 Chair imported from 3GU
R1‑1911418 Physical layer structure for NR sidelink vivo imported from 3GU
R1‑1911419 Discussion on mode 1 resource allocation mechanism vivo imported from 3GU
R1‑1911420 Discussion on mode 2 resource allocation mechanism vivo imported from 3GU
R1‑1911421 Sidelink synchronization mechanism vivo imported from 3GU
R1‑1911422 Summary of draft CRs regarding DL preemption vivo imported from 3GU
R1‑1911423 Summary of CRs on UCI multiplexing on PUSCH Qualcomm Incorporated imported from 3GU
R1‑1911424 Feature Lead Summary for 7.2.4.6 QoS management Nokia imported from 3GU
R1‑1911425 Feature Lead Summary of Enhancements on Multi-TRP/Panel Transmission Huawei imported from 3GU
R1‑1911426 Summary of Remaining Issues and Agreements for Enhancements on Multi-TRP/panel transmission Huawei imported from 3GU
R1‑1911427 Clarification for Type II port selection codebook Ericsson, Samsung imported from 3GU
R1‑1911428 LS Reply on maximum value of MDBV CT3, Nokia imported from 3GU
R1‑1911429 Report of RAN1#98 meeting ETSI MCC imported from 3GU
R1‑1911430 FL summary#0 for physical layer control procedures for NTN Ericsson imported from 3GU
R1‑1911431 Remaining design aspects for NTN Huawei, HiSilicon imported from 3GU
R1‑1911432 Feature Lead Summary #1 on AI 7.2.10.1 - DL Reference Signals for NR Positioning Intel Corporation imported from 3GU
R1‑1911433 Summary for Rel-15 CRs on CG NTT DOCOMO imported from 3GU
R1‑1911434 TEI on TRS for FR1 CMCC, ZTE, Huawei, HiSilicon, CATT imported from 3GU
R1‑1911435 Offline Summary for Cross-Slot Scheduling Adaptation MediaTek imported from 3GU
R1‑1911436 Efficient and low latency SCell data transmission for NR CA MediaTek imported from 3GU
R1‑1911437 Summary on UCI enhancements for URLLC OPPO imported from 3GU
R1‑1911438 Summary of email discussion [98-NR-14] on on how to determine the priority of SR, A/N, and PUSCH in PHY OPPO imported from 3GU
R1‑1911439 Correction on timing for MAC CE applicability with HARQ-ACK repetition in 38.214 CATT imported from 3GU
R1‑1911440 Feature lead summary on AI 7.2.4.3 Sidelink synchronization mechanism CATT imported from 3GU
R1‑1911441 On NTN link level and system level evaluations Ericsson imported from 3GU
R1‑1911442 Summary of 7.2.3.2 – Mechanisms for resource multiplexing among backhaul and access links Qualcomm imported from 3GU
R1‑1911443 Preliminary simulation results for NTN ZTE imported from 3GU
R1‑1911444 FL summary for 7.2.10.2 UL Reference Signals for NR Positioning Ericsson imported from 3GU
R1‑1911445 Correction on SS-RSRPB measurement Huawei, HiSilicon imported from 3GU
R1‑1911446 Link budget analysis of NR NTN MediaTek Inc. imported from 3GU
R1‑1911447 Correction of RSTD measurement for E-UTRA Huawei, HiSilicon imported from 3GU
R1‑1911448 FL Summary#2 of Channel Structure for 2-step RACH ZTE Corporation imported from 3GU
R1‑1911449 CR on simultaneous transmission of UL channels Samsung imported from 3GU
R1‑1911450 FL summary on remaining issues on enhancements to single Tx switched uplink for EN-DC Apple Inc. imported from 3GU
R1‑1911451 Feature Lead Summary on SCell BFR and L1-SINR Apple Inc. imported from 3GU
R1‑1911452 Summary#1 of offline discussion on Full TX Power UL transmission vivo imported from 3GU
R1‑1911453 Feature Lead Summary of link-level and system level evaluations Thales imported from 3GU
R1‑1911454 Calibration results comparison Thales imported from 3GU
R1‑1911455 FL summary#1 for uplink power control for NR-NR DC Apple Inc. imported from 3GU
R1‑1911456 Enable gNB to configure downgrading configuration of SRS for antenna switching OPPO imported from 3GU
R1‑1911457 Feature lead summary#2 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911458 Discussion on NR sidelink synchronization mechanism LG Electronics imported from 3GU
R1‑1911459 Summary#2 of efficient and low latency serving cell configuration/activation/setup Ericsson imported from 3GU
R1‑1911460 Summary#2 of PDCCH-based power saving signal/channel CATT imported from 3GU
R1‑1911461 [draft] LS on PDCCH-based Power Saving Signal/Channel carrying indication of UE wakeup before DRX ON CATT imported from 3GU
R1‑1911462 Monday offline discussion on draft CRs on DCI and resource allocation Ericsson imported from 3GU
R1‑1911463 CR on simultaneous transmission of UL channels Samsung imported from 3GU
R1‑1911464 Summary#2 for Rel-15 CRs on CG NTT DOCOMO imported from 3GU
R1‑1911465 Feature lead summary for MU-MIMO CSI Monday offline session Samsung imported from 3GU
R1‑1911466 Offline Summary#2 for Cross-Slot Scheduling Adaptation MediaTek imported from 3GU
R1‑1911467 FL Summary#2 of 7.2.3.3 case-1 OTA timing alignment ZTE, Sanechips imported from 3GU
R1‑1911468 Summary#2 of offline discussion on Full TX Power UL transmission vivo imported from 3GU
R1‑1911469 Summary#2 of CRs on UCI multiplexing on PUSCH Qualcomm Incorporated imported from 3GU
R1‑1911470 Feature Lead proposals for M-TRP Online Session on Tuesday Huawei imported from 3GU
R1‑1911471 Feature Lead summary for M-TRP Offline Session on Tuesday Huawei imported from 3GU
R1‑1911472 RMSI Transmission on Scell AT&T, BT, Deutsche Telekom, Nokia, NTT Docomo, Samsung, T-Mobile USA imported from 3GU
R1‑1911473 Correction on PUSCH scheduling with CSS for Case 1 HARQ timing Huawei, HiSilicon imported from 3GU
R1‑1911474 Correction on PRACH transmission for intra-band EN-DC Huawei, HiSilicon imported from 3GU
R1‑1911475 LS on PDCCH-based Power Saving Signal/Channel carrying indication of UE wakeup before DRX ON RAN1, CATT imported from 3GU
R1‑1911476 Summary#2 of Rel.15 maintenance for PDCCH and search space Qualcomm Incorporated imported from 3GU
R1‑1911477 Summary#2 of 7.2.5.3 on UL timing and PRACH for NTN ZTE imported from 3GU
R1‑1911478 Summary#2 of 7.2.3.2 – Mechanisms for resource multiplexing among backhaul and access links Qualcomm imported from 3GU
R1‑1911479 [draft] LS on UE adaptation to maximum number of MIMO layers vivo imported from 3GU
R1‑1911480 Feature lead summary#2 of Enhancements on Multi-beam Operations LG Electronics imported from 3GU
R1‑1911481 Draft CR on configuration of CORESET and search space set ZTE imported from 3GU
R1‑1911482 Correction on interrupted transmission indication Huawei,HiSilicon imported from 3GU
R1‑1911483 Draft alignment CR on P0 index for PUCCH power control ZTE imported from 3GU
R1‑1911484 Feature lead summary for UL Signals and Channels Ericsson imported from 3GU
R1‑1911485 Feature lead summary#3 of Enhancements on Multi-beam Operations LG Electronics imported from 3GU
R1‑1911486 FL Summary#3 of Channel Structure for 2-step RACH ZTE Corporation imported from 3GU
R1‑1911487 Tuesday offline discussion on NTN physical layer control procedures Ericsson imported from 3GU
R1‑1911488 CR on beta_offset values for UCI reporting in PUSCH ZTE imported from 3GU
R1‑1911489 Correction on resource allocation for uplink transmission with configured grant Type 1 Sharp imported from 3GU
R1‑1911490 Draft CR to TR 38.901 for remaining open issues in IIOT channel modelling Huawei, HiSilicon imported from 3GU
R1‑1911491 Correction on demodulation reference signal precoding for PUSCH codebook based Orange imported from 3GU
R1‑1911492 Feature lead summary#3 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911493 FL Summary#2 on cross-carrier scheduling with different SCS remaining issues Nokia imported from 3GU
R1‑1911494 FL Summary#2 on cross-carrier A-CSI RS triggering with different SCS Nokia imported from 3GU
R1‑1911495 Correction on power control for NE-DC Huawei, HiSilicon imported from 3GU
R1‑1911496 Summary of Draft CRs on Bandwidth Part Operation MediaTek imported from 3GU
R1‑1911497 draft LS on NR IAB case-1 timing ZTE imported from 3GU
R1‑1911498 Draft CR on UL/SUL indicator in DCI format 0_1 MediaTek imported from 3GU
R1‑1911499 Feature lead summary for MU-MIMO CSI email offline on UCI omission Samsung imported from 3GU
R1‑1911500 LS to RAN1 on WUS for short DRX cycle RAN2, vivo imported from 3GU
R1‑1911501 Summary#2 of UE adaptation to maximum number of MIMO layers vivo imported from 3GU
R1‑1911502 Correction on PUSCH scheduling with CSS for Case 1 HARQ timing Huawei, HiSilicon imported from 3GU
R1‑1911503 Summary #1 of Enhancements to Scheduling/HARQ Qualcomm Incorporated imported from 3GU
R1‑1911504 Summary of Email Discussion [98-NR-15] on Downlink Out-of-Order Operation Qualcomm Incorporated imported from 3GU
R1‑1911505 Tuesday offline discussion on draft CRs on DCI and resource allocation Ericsson imported from 3GU
R1‑1911506 Feature Lead Summary#2 on SCell BFR and L1-SINR Apple Inc. imported from 3GU
R1‑1911507 Chairman's notes of AI 7.2.12 NR mobility enhancements Ad-Hoc Chair (Ericsson) imported from 3GU
R1‑1911508 Chairman's notes of AI 7.2.10 ^^Study on NR positioning support Ad-Hoc Chair (Ericsson) imported from 3GU
R1‑1911509 Chairman's notes of AI 7.2.8 ^^Enhancements on MIMO for NR Ad-Hoc Chair (Samsung, NTT DOCOMO) imported from 3GU
R1‑1911510 Chairman's notes of AI 7.2.5 Study on solutions for NR to support Non Terrestrial Network (NTN) Ad-Hoc Chair (Ericsson) imported from 3GU
R1‑1911511 Chairman's notes of AI 7.2.2^^ Study on NR-based Access to Unlicensed Spectrum Ad-Hoc Chair (Ericsson) imported from 3GU
R1‑1911512 Chairman's notes of AI 7.1.6 UE features list Ad-Hoc Chair (NTT DOCOMO) imported from 3GU
R1‑1911513 Chairman's notes of AI 7.1.5 Maintenance for UL power control Ad-Hoc Chair (Samsung) imported from 3GU
R1‑1911514 Chairman's notes of AI 7.1.4 Maintenance for NR-LTE co-existence Ad-Hoc Chair (Ericsson) imported from 3GU
R1‑1911515 Chairman's notes of AI 7.1.2 Maintenance for MIMO Ad-Hoc Chair (Samsung) imported from 3GU
R1‑1911516 Summary#2 on UE feature related discussion NTT DOCOMO, INC. imported from 3GU
R1‑1911517 Feature Lead Summary#2 of link-level and system level evaluations Thales imported from 3GU
R1‑1911518 DL reference signals for NR positioning Ericsson imported from 3GU
R1‑1911519 Draft CR on beta_offset values for UCI reporting in PUSCH ZTE imported from 3GU
R1‑1911520 TEI proposal on aperiodic RS triggering offset ZTE, Sanechips imported from 3GU
R1‑1911521 Offline Summary#3 for Cross-Slot Scheduling Adaptation MediaTek imported from 3GU
R1‑1911522 Feature lead summary#4 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911523 Correction on RACH occasion Huawei, HiSilicon imported from 3GU
R1‑1911524 Draft Reply LS on single PDCCH based multi-TRP operation Huawei imported from 3GU
R1‑1911525 Summary#3 of CRs on UCI multiplexing on PUSCH Qualcomm Incorporated imported from 3GU
R1‑1911526 FL summary for initial access signals and channels Qualcomm Incorporated imported from 3GU
R1‑1911527 Summary of Wednesday offline discussion on PUSCH enhancements for NR eURLLC (AI 7.2.6.3) Nokia imported from 3GU
R1‑1911528 LS on UE adaptation to maximum number of MIMO layers RAN1, vivo imported from 3GU
R1‑1911529 Offline summary for NR timing ambiguity Qualcomm imported from 3GU
R1‑1911530 CR on beta_offset values for UCI reporting in PUSCH ZTE imported from 3GU
R1‑1911531 FL summary#2 for 7.2.10.3 UE and gNB measurements for NR Positioning CATT imported from 3GU
R1‑1911532 Correction on RACH occasion Huawei, HiSilicon imported from 3GU
R1‑1911533 Correction of RSTD measurement for E-UTRA Huawei, HiSilicon imported from 3GU
R1‑1911534 Clarification for CSI-RS measurement in DRX Ericsson imported from 3GU
R1‑1911535 Summary#3 of 7.2.3.2 – Mechanisms for resource multiplexing among backhaul and access links Qualcomm imported from 3GU
R1‑1911536 LS on differentiating between MSG2 and MSGB RAN2, ZTE imported from 3GU
R1‑1911537 Draft CR on PUSCH configuration for UL/SUL carrier MediaTek imported from 3GU
R1‑1911538 Summary of offline discussions on physical layer aspects of enhanced mobility Intel Corporation imported from 3GU
R1‑1911539 Summary#2 on NR Rel-16 TEI related discussion NTT DOCOMO, INC. imported from 3GU
R1‑1911540 FL Summary#4 of Channel Structure for 2-step RACH ZTE Corporation imported from 3GU
R1‑1911541 Feature Lead Summary #2 on AI 7.2.10.1 - DL Reference Signals for NR Positioning Intel Corporation imported from 3GU
R1‑1911542 Corrections to 38.211 including alignment of terminology across specifications in RAN1#98bis Ericsson imported from 3GU
R1‑1911543 Corrections to 38.212 including alignment of terminology across specifications in RAN1#98bis Huawei imported from 3GU
R1‑1911544 Corrections to 38.213 including alignment of terminology across specifications in RAN1#98bis Samsung imported from 3GU
R1‑1911545 Corrections to 38.214 including alignment of terminology across specifications in RAN1#98bis Nokia imported from 3GU
R1‑1911546 draft LS on NR IAB case-1 timing ZTE imported from 3GU
R1‑1911547 38.214 CR - Clarification to the dynamically scheduled PDSCH collision with SPS-PDSCH Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911548 LS on NR IAB case-1 timing RAN1, ZTE imported from 3GU
R1‑1911549 Feature Lead Summary#3 on SCell BFR and L1-SINR Apple Inc. imported from 3GU
R1‑1911550 Reply LS on single PDCCH based multi-TRP operation RAN1, Huawei imported from 3GU
R1‑1911551 Contention Window Update in Initiating Device Channel Access Mechanism of EN 301 893 ETSI TC BRAN imported from 3GU
R1‑1911552 Summary#2 for AI 7.2.4.2.2 V2X Mode-2 Resource Allocation Intel Corporation imported from 3GU
R1‑1911553 Correction on resource allocation for uplink transmission with configured grant Type 1 Sharp imported from 3GU
R1‑1911554 Summary#2 of 7.2.6.7 others LG Electronics imported from 3GU
R1‑1911555 Summary of discussions on SSB&rate matching pattern overlapping with PDSCH DMRS Huawei, HiSIlicon imported from 3GU
R1‑1911556 Revised summary of email discussion [98-NR-14] on on how to determine the priority of SR, A/N, and PUSCH in PHY OPPO imported from 3GU
R1‑1911557 Text proposal of cross-slot scheduling for TS38.300 CATT imported from 3GU
R1‑1911558 Offline Summary of PDCCH-based power saving signal/channel CATT imported from 3GU
R1‑1911559 Summary#1 of offline discussion on Configured grant enhancement vivo imported from 3GU
R1‑1911560 Summary#2 of 7.2.5.4 on more delay-tolerant re-transmission mechanisms in NR-NTN MediaTek Inc. imported from 3GU
R1‑1911561 Feature lead summary#4 of Enhancements on Multi-beam Operations LG Electronics imported from 3GU
R1‑1911562 Feature lead summary#2 for UL Signals and Channels Ericsson imported from 3GU
R1‑1911563 Offline Summary#4 for Cross-Slot Scheduling Adaptation MediaTek imported from 3GU
R1‑1911564 Update to the list of higher layer parameters for NR Positioning (RAN1-98bis) Intel Corp. imported from 3GU
R1‑1911565 Wednesday offline discussion on NTN physical layer control procedures Ericsson imported from 3GU
R1‑1911566 [draft] Reply LS on MAC CE design for SCell BFR Apple imported from 3GU
R1‑1911567 Offline notes#2 for 7.2.10.2 UL Reference Signals for NR Positioning Ericsson imported from 3GU
R1‑1911568 Summary#3 of offline discussion on Full TX Power UL transmission vivo imported from 3GU
R1‑1911569 Discussion on RSSI and CO measurements for NR-U ZTE, Sanechips imported from 3GU
R1‑1911570 Correction on the simultaneous transmission of PRACH and PUCCH/PUSCH CATT imported from 3GU
R1‑1911571 Clarification on RAR search space configuration Spreadtrum Communications imported from 3GU
R1‑1911572 Draft CR on beta_offset values for UCI reporting in PUSCH ZTE imported from 3GU
R1‑1911573 RAN1 agreements for Rel-16 Additional MTC Enhancements for LTE WI rapporteur (Ericsson) imported from 3GU
R1‑1911574 Summary of RRC parameters for L1 configuration for Rel-16 LTE-MTC WI rapporteur (Ericsson) imported from 3GU
R1‑1911575 RAN1 agreements for Rel-16 Additional Enhancements for NB-IoT WI rapporteur (Futurewei) imported from 3GU
R1‑1911576 Summary of RRC parameters for Rel-16 NB-IoT WI rapporteur (Futurewei) imported from 3GU
R1‑1911577 RAN1 agreements for DL MIMO efficiency enhancements for LTE WI rapporteur (Huawei) imported from 3GU
R1‑1911578 List of RRC parameters for DL MIMO efficiency enhancements for LTE WI rapporteur (Huawei) imported from 3GU
R1‑1911579 RAN1 agreements for LTE-based 5G terrestrial broadcast WI rapporteur (Qualcomm Incorporated) imported from 3GU
R1‑1911580 RRC parameter list for LTE-based 5G terrestrial broadcast WI rapporteur (Qualcomm Incorporated) imported from 3GU
R1‑1911581 RAN1 agreements for Rel-16 2-step RACH WI Rapporteur (ZTE) imported from 3GU
R1‑1911582 Summary of RRC parameters for Rel-16 NR 2-step RACH WI Rapporteur (ZTE) imported from 3GU
R1‑1911583 Offline summary for maintenance for scheduling and HARQ management Qualcomm imported from 3GU
R1‑1911584 LS on SFN LSB indication in msg2/msgB RAN2, Qualcomm imported from 3GU
R1‑1911585 LS on PHR reporting for NR-U RAN2, Lenovo imported from 3GU
R1‑1911586 LS on UE higher layer signalling for cross-slot scheduling RAN1, MediaTek imported from 3GU
R1‑1911587 Reply LS on MAC CE design for SCell BFR RAN1, Apple imported from 3GU
R1‑1911588 FL Summary#5 of Channel Structure for 2-step RACH ZTE Corporation imported from 3GU
R1‑1911589 Correction on HARQ-ACK transmission with BWP change MediaTek, CATT, ZTE imported from 3GU
R1‑1911590 CR on slot configuration regarding PUSCH scheduled by RAR UL grant ZTE imported from 3GU
R1‑1911591 Correction on resource allocation for uplink transmission with configured grant Type 1 Sharp imported from 3GU
R1‑1911592 Draft reply to LS on PHR reporting for NR-U Lenovo imported from 3GU
R1‑1911593 Feature lead summary#5 of Enhancements on Multi-beam Operations LG Electronics imported from 3GU
R1‑1911594 Summary#3 of efficient and low latency serving cell configuration/activation/setup Ericsson imported from 3GU
R1‑1911595 Feature lead summary#2 for agenda item 7.2.4.1 Physical layer structure for sidelink Samsung imported from 3GU
R1‑1911596 Draft Reply LS on additional PDCCH monitoring occasions for paging for NR-U ZTE, Sanechips imported from 3GU
R1‑1911597 Summary#4 of 7.2.3.2 – Mechanisms for resource multiplexing among backhaul and access links Qualcomm imported from 3GU
R1‑1911598 [draft] LS on SCell BFR Apple imported from 3GU
R1‑1911599 Feature lead summary#5 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911600 Offline Summary#5 for Cross-Slot Scheduling Adaptation MediaTek imported from 3GU
R1‑1911601 Summary#4 of efficient and low latency serving cell configuration/activation/setup Ericsson imported from 3GU
R1‑1911602 Summary#3 of 7.2.6.7 others LG Electronics imported from 3GU
R1‑1911603 Feature Lead summary for M-TRP Offline Session on Thursday Huawei imported from 3GU
R1‑1911604 Correction on power control for NE-DC Huawei, HiSilicon imported from 3GU
R1‑1911605 [DRAFT] LS on applicable timing for pathloss RS activated/updated by MAC-CE LG Electronics imported from 3GU
R1‑1911606 Introduction of Zadoff-Chu sequences of length 571 and 1151 for NR-U PRACH Huawei, HiSilicon imported from 3GU
R1‑1911607 FL Summary on support of unaligned frame boundary for R16 NR inter-band CA CMCC imported from 3GU
R1‑1911608 Summary#3 for AI 7.2.4.2.2 V2X Mode-2 Resource Allocation Intel Corporation imported from 3GU
R1‑1911609 38.214 CR - Clarification to the dynamically scheduled PDSCH collision with SPS-PDSCH Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911610 Feature Lead Summary#4 on SCell BFR and L1-SINR Apple imported from 3GU
R1‑1911611 CR on UL/SUL indicator in DCI format 0_1 MediaTek imported from 3GU
R1‑1911612 Summary#4 of offline discussion on Full TX Power UL transmission vivo imported from 3GU
R1‑1911613 Summary of discussions on downgrading configuration of SRS for antenna switching OPPO imported from 3GU
R1‑1911614 Introduction of Zadoff-Chu sequences of length 571 and 1151 for NR-U PRACH Huawei, HiSilicon imported from 3GU
R1‑1911615 [Draft] LS on simultaneous TCI state activation and spatial relation update across multiple CCs/BWPs by MAC-CE LG Electronics imported from 3GU
R1‑1911616 LS on applicable timing for pathloss RS activated/updated by MAC-CE RAN1, LG Electronics imported from 3GU
R1‑1911617 LS on simultaneous TCI state activation and spatial relation update across multiple CCs/BWPs by MAC-CE RAN1, LG Electronics imported from 3GU
R1‑1911618 Feature lead summary#2 of HARQ enhancements for NR-U Huawei imported from 3GU
R1‑1911619 LS on SCell BFR RAN1, Apple imported from 3GU
R1‑1911620 Offline Summary#2 of PDCCH-based power saving signal/channel CATT imported from 3GU
R1‑1911621 FL Summary#6 of Channel Structure for 2-step RACH ZTE Corporation imported from 3GU
R1‑1911622 Thursday offline discussion on draft CRs on DCI and resource allocation Ericsson imported from 3GU
R1‑1911623 Correction on time gap definition for HARQ-ACK transmission CATT imported from 3GU
R1‑1911624 Correction on timeline requirement for Type-1 HARQ-ACK codebook CATT imported from 3GU
R1‑1911625 FL summary#3 for 7.2.10.3 UE and gNB measurements for NR Positioning CATT imported from 3GU
R1‑1911626 Summary#3 of UE adaptation to maximum number of MIMO layers vivo imported from 3GU
R1‑1911627 Summary#2 of 7.2.10.4: PHY procedures for positioning measurements Qualcomm Incorporated imported from 3GU
R1‑1911628 Summary#3 on NR Rel-16 TEI related discussion NTT DOCOMO, INC. imported from 3GU
R1‑1911629 Summary#2 on UCI enhancements for URLLC OPPO imported from 3GU
R1‑1911630 Revised summary#2 of email discussion [98-NR-14] on on how to determine the priority of SR, A/N, and PUSCH in PHY OPPO imported from 3GU
R1‑1911631 Summary of Thursday offline discussion on PUSCH enhancements for NR eURLLC (AI 7.2.6.3) Nokia imported from 3GU
R1‑1911632 Feature Lead Summary#2 for 7.2.4.6 QoS management Nokia imported from 3GU
R1‑1911633 Draft LS on SRS for NR Positioning Intel Corp. imported from 3GU
R1‑1911634 LS on SRS for NR Positioning RAN1, Intel Corp. imported from 3GU
R1‑1911635 Offline summary#2 for maintenance for scheduling and HARQ management Qualcomm imported from 3GU
R1‑1911636 Correction on time gap definition for random access procedure Qualcomm, CATT imported from 3GU
R1‑1911637 Summary #2 of Enhancements to Scheduling/HARQ Qualcomm Incorporated imported from 3GU
R1‑1911638 Summary of Friday offline discussion on PDCCH enhancements Huawei imported from 3GU
R1‑1911639 Proposal on slot alignment^^Qualcomm Qualcomm imported from 3GU
R1‑1911640 Offline notes#3 for 7.2.10.2 UL Reference Signals for NR Positioning Ericsson imported from 3GU
R1‑1911641 [Draft] Reply LS on propagation delay compensation for reference time information delivery Nokia imported from 3GU
R1‑1911642 Summary of non-official offline discussion on TEI on TRS for FR1 CMCC imported from 3GU
R1‑1911643 Feature lead summary#2 on Resource allocation for NR sidelink Mode 1 Ericsson imported from 3GU
R1‑1911644 Text proposal of cross-slot scheduling for TS38.300 CATT imported from 3GU
R1‑1911645 Draft LS on UE power saving terminology and text proposal to 38.300 CATT imported from 3GU
R1‑1911646 Correction on time gap definition for HARQ-ACK transmission CATT imported from 3GU
R1‑1911647 Feature lead summary#6 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911648 [draft] Reply LS on RAN2 agreements related to 2-step RACH Nokia imported from 3GU
R1‑1911649 [Draft] Reply to LS on differentiating between MSG2 and MSGB Nokia imported from 3GU
R1‑1911650 FL summary#2 for uplink power control for NR-NR DC Apple Inc. imported from 3GU
R1‑1911651 Summary#5 of 7.2.3.2 – Mechanisms for resource multiplexing among backhaul and access links Qualcomm imported from 3GU
R1‑1911652 Offline Summary#6 for Cross-Slot Scheduling Adaptation MediaTek imported from 3GU
R1‑1911653 Summary#5 of efficient and low latency serving cell configuration/activation/setup Ericsson imported from 3GU
R1‑1911654 Feature lead summary 2 of enhancements to initial access procedures Charter Communications, Inc imported from 3GU
R1‑1911655 Proposed conclusion for CSI-RS measurement in DRX Ericsson imported from 3GU
R1‑1911656 Reply to LS on differentiating between MSG2 and MSGB RAN1, Nokia imported from 3GU
R1‑1911657 Email discussion on UE capability with FRX & XDD differentiation ZTE imported from 3GU
R1‑1911658 Offline discussions on URLLC enhanced configured grant transmission NTT DOCOMO imported from 3GU
R1‑1911659 Feature lead summary#7 on 2 step RACH procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911660 Summary #2 of enhanced inter-UE Tx prioritization/multiplexing vivo imported from 3GU
R1‑1911661 FL summary#3 for uplink power control for NR-NR DC Apple Inc. imported from 3GU
R1‑1911662 [Draft] LS on signalling of sidelink RSRP and CSI between Ues LG Electronics imported from 3GU
R1‑1911663 38.214 CR - Clarification to the dynamically scheduled PDSCH collision with SPS-PDSCH Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911664 Correction on time gap definition for random access procedure Qualcomm, CATT imported from 3GU
R1‑1911665 [DRAFT] Response LS on the feasibility of Received Interference Power measurement Huawei imported from 3GU
R1‑1911666 Summary#2 of discussions on downgrading configuration of SRS for antenna switching OPPO imported from 3GU
R1‑1911667 LS on UE power saving terminology and text proposal to 38.300 RAN1, CATT imported from 3GU
R1‑1911668 FL Summary#2 on support of unaligned frame boundary for R16 NR inter-band CA CMCC imported from 3GU
R1‑1911669 Feature lead summary#2 on AI 7.2.4.3 Sidelink synchronization mechanism CATT imported from 3GU
R1‑1911670 CR to TR 38.901 for remaining open issues in IIOT channel modelling Huawei, HiSilicon imported from 3GU
R1‑1911671 LCP restriction for Dynamic Grant RAN2, Qualcomm imported from 3GU
R1‑1911672 LS on Handling Multiple Unicast Links with Peer UE RAN2, InterDigital imported from 3GU
R1‑1911673 LS on Layer 2 Identifiers for NR sidelink communication RAN2, LG Electronics imported from 3GU
R1‑1911674 Feature lead summary#3 for UL Signals and Channels Ericsson imported from 3GU
R1‑1911675 Reply LS on mapping between LTE V2X PPPP and NR V2X priority SA2, Qualcomm imported from 3GU
R1‑1911676 Reply LS on Sidelink HARQ Feedback for Groupcast SA2, LG Electronics imported from 3GU
R1‑1911677 LS on sync raster for NR V2X RAN4, vivo imported from 3GU
R1‑1911678 Reply LS on simultaneous transmission of PSFCH RAN4, Qualcomm Incorporated imported from 3GU
R1‑1911679 Reply LS on AGC settling time and RB size of PSFCH RAN4, LG Electronics imported from 3GU
R1‑1911680 LS on UL wideband operation for NR-U RAN4, Qualcomm Incorporated imported from 3GU
R1‑1911681 LS Response on the feasibility of time synchronization accuracy requirements and related testing RAN4, Nokia imported from 3GU
R1‑1911682 Sidelink physical structure for NR V2X communication Intel Corporation imported from 3GU
R1‑1911683 Summary#4 for AI 7.2.4.2.2 V2X Mode-2 Resource Allocation Intel Corporation imported from 3GU
R1‑1911684 Feature Lead summary#2 of In-device Coexistence Aspects in NR-V2X (AI 7.2.4.4) Qualcomm Incorporated imported from 3GU
R1‑1911685 Feature lead summary 3 of enhancements to initial access procedures Charter Communications, Inc imported from 3GU
R1‑1911686 Summary#4 of 7.2.6.7 others LG Electronics imported from 3GU
R1‑1911687 Feature lead summary#2 of support of NR Uu controlling LTE sidelink Futurewei imported from 3GU
R1‑1911688 Summary #3 of enhanced inter-UE Tx prioritization/multiplexing vivo imported from 3GU
R1‑1911689 [Draft] Reply LS on SL RLM/RLF InterDigital imported from 3GU
R1‑1911690 Offline discussions#2 on URLLC enhanced configured grant transmission NTT DOCOMO imported from 3GU
R1‑1911691 Summary#3 on UCI enhancements for URLLC OPPO imported from 3GU
R1‑1911692 Summary#5 of 7.2.6.7 others LG Electronics imported from 3GU
R1‑1911693 Reply LS on propagation delay compensation for reference time information delivery RAN1, Nokia imported from 3GU
R1‑1911694 Summary#6 of 7.2.6.7 others LG Electronics imported from 3GU
R1‑1911695 Summary of Saturday offline discussion on PUSCH enhancements for NR eURLLC (AI 7.2.6.3) Nokia imported from 3GU
R1‑1911696 Summary of Unofficial Offline Discussion on Wideband PRACH Design for NR-U Samsung, LG Electronics, ZTE, Sanechips, vivo, Fujitsu, MediaTek Inc., Nokia, NSB, OPPO, Xiaomi imported from 3GU
R1‑1911697 Feature lead summary#3 of HARQ enhancements for NR-U Huawei imported from 3GU
R1‑1911698 LS on signalling of sidelink RSRP and CSI between Ues RAN1, LG Electronics imported from 3GU
R1‑1911699 Reply LS on SL RLM/RLF RAN1, InterDigital imported from 3GU
R1‑1911700 Summary#3 of Enhancements to Scheduling/HARQ Qualcomm Incorporated imported from 3GU
R1‑1911701 Summary#2 of Saturday offline discussion on PUSCH enhancements for NR eURLLC (AI 7.2.6.3) Nokia imported from 3GU
R1‑1911702 Feature lead summary#2 for AI 7.2.4.5 Physical layer procedures for sidelink LG Electronics imported from 3GU
R1‑1911703 Feature lead summary#3 for agenda item 7.2.4.1 Physical layer structure for sidelink Samsung imported from 3GU
R1‑1911704 Summary of Sunday offline discussion on PDCCH enhancements Huawei imported from 3GU
R1‑1911705 Reply LS on additional PDCCH monitoring occasions for paging for NR-U RAN1, ZTE imported from 3GU
R1‑1911706 Feature Lead’s Summary#2 on Channel Access Procedures Nokia, Nokia Shanghai Bell imported from 3GU
R1‑1911707 Summary#4 on UCI enhancements for URLLC OPPO imported from 3GU
R1‑1911708 Summary#4 of Enhancements to Scheduling/HARQ Qualcomm Incorporated imported from 3GU
R1‑1911709 Feature Lead Summary#3 for 7.2.4.6 QoS management Nokia imported from 3GU
R1‑1911710 [DRAFT] LS on NR V2X synchronization procedures CATT imported from 3GU
R1‑1911711 Summary#2 of Sunday offline discussion on PDCCH enhancements Huawei imported from 3GU
R1‑1911712 Summary #4 of enhanced inter-UE Tx prioritization/multiplexing vivo imported from 3GU
R1‑1911713 Feature lead summary#3 on Resource allocation for NR sidelink Mode 1 Ericsson imported from 3GU
R1‑1911714 Feature lead summary#3 on AI 7.2.4.3 Sidelink synchronization mechanism CATT imported from 3GU
R1‑1911715 Feature lead summary#3 of support of NR Uu controlling LTE sidelink Futurewei imported from 3GU
R1‑1911716 Feature lead summary#4 for agenda item 7.2.4.1 Physical layer structure for sidelink Samsung imported from 3GU
R1‑1911717 Summary#3 of Sunday offline discussion on PDCCH enhancements ^^Huawei Huawei imported from 3GU
R1‑1911718 LS on NR V2X synchronization procedures RAN1, CATT imported from 3GU
R1‑1911719 Draft reply LS on UL-SL prioritization OPPO imported from 3GU
R1‑1911720 Reply LS on UL-SL prioritization RAN1, OPPO imported from 3GU
R1‑1911721 RAN1 agreements for Rel-16 NR-U WI rapporteur (Qualcomm Incorporated) imported from 3GU
R1‑1911722 Summary of RRC parameters for NR-U WI rapporteur (Qualcomm Incorporated) imported from 3GU
R1‑1911723 RAN1 agreements for Rel-16 IAB WI rapporteur (Qualcomm Incorporated) imported from 3GU
R1‑1911724 Upper layers parameters to support IAB physical layer operation WI rapporteur (Qualcomm Incorporated) imported from 3GU
R1‑1911725 RAN1 Agreements on WI 5G V2X with NR sidelink WI rapporteur (LG Electronics) imported from 3GU
R1‑1911726 High layer parameters in WI 5G V2X with NR sidelink WI rapporteur (LG Electronics) imported from 3GU
R1‑1911727 RAN1 agreements for Rel-16 NR IIoT WI WI rapporteur (Nokia) imported from 3GU
R1‑1911728 RAN1 agreements for Rel-16 eURLLC WI rapporteur (Huawei) imported from 3GU
R1‑1911729 Summary of RRC parameters for NR eURLLC WI rapporteur (Huawei) imported from 3GU
R1‑1911730 RAN1 agreements for NR_eMIMO WI rapporteur (Samsung) imported from 3GU
R1‑1911731 Summary of RRC parameters for Rel.16 NR_eMIMO WI rapporteur (Samsung) imported from 3GU
R1‑1911732 RAN1 agreements for UE power saving WI rapporteur (CATT) imported from 3GU
R1‑1911733 List of higher layer parameters for UE power saving WI rapporteur (CATT) imported from 3GU
R1‑1911734 RAN1 agreements on NR Positioning WI rapporteur (Intel Corporation) imported from 3GU
R1‑1911735 List of higher layer parameters for NR Positioning WI rapporteur (Intel Corporation) imported from 3GU
R1‑1911736 RAN1 agreements on NR Mobility Enhancement WI WI rapporteur (Intel Corporation) imported from 3GU
R1‑1911737 RAN1 agreements for Multi-RAT Dual-Connectivity and Carrier Aggregation enhancements (LTE, NR) WI rapporteur (Nokia) imported from 3GU
R1‑1911738 List of RRC parameters for Multi-RAT Dual-Connectivity and Carrier Aggregation enhancements WI rapporteur (Nokia) imported from 3GU
R1‑1911739 Reply LS on RAN2 agreements related to 2-step RACH RAN1, Nokia imported from 3GU
R1‑1911740 Summary of RRC parameters for Rel-16 NB-IoT WI rapporteur (Futurewei) imported from 3GU
R1‑1911741 Reply LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities RAN1, ZTE imported from 3GU
R1‑1911742 RAN1 agreements for Rel-16 2-step RACH WI Rapporteur (ZTE) imported from 3GU
R1‑1911743 Consolidated parameter list for Rel-16 NR Qualcomm imported from 3GU
R1‑1911744 Consolidated parameter list for Rel-16 LTE Qualcomm imported from 3GU
R1‑1911745 LS on Rel-16 LTE and NR parameter lists RAN1, Qualcomm imported from 3GU
R1‑1911746 LS on additional high layer information for sidelink physical layer operations RAN1, LG Electronics imported from 3GU
R1‑1911747 Summary of RRC parameters for Rel.16 NR TEI WI rapporteur (NTT DOCOMO) imported from 3GU
R1‑1911748 Summary of RRC parameters for Rel-16 NR IIoT WI WI rapporteur (Nokia) imported from 3GU
R1‑1911749 Email discussion/approval [98b-NR-22] on proposals for time domain resource allocation for PDSCH Huawei imported from 3GU
R1‑1911750 RAN1 UE features list for Rel-16 LTE AT&T, NTT DOCOMO imported from 3GU
R1‑1911751 RAN1 UE features list for Rel-16 NR AT&T, NTT DOCOMO imported from 3GU

page generated from database: 2024-04-13 13:51:47

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links