3GPP TDocs (written contributions) at meeting
Meeting: R1-78 - 2014-08-18 to 2014-08-22, Dresden
meeting id: R1-78 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑142800 | Draft Agenda for RAN1#78 meeting | RAN1 Chairman | Approved |
R1‑142801 | Final Report of RAN1#77 meeting | MCC | Revised |
R1‑142802 | Selected highlights from RAN#64 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑142803 | LS on Enhanced Broadcast of System Information | RAN2, Ericsson | Noted |
R1‑142804 | Reply LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE | RAN2, Ericsson | Noted |
R1‑142805 | Reply LS on D2D resource allocation Modes 1&2 | RAN2, Ericsson | Noted |
R1‑142806 | Reply LS on LTE Rel-12 UE feature list | RAN2, NTT DOCOMO | Noted |
R1‑142807 | LS on Introducing the ProSe Authorized IE | RAN3, Ericsson | Noted |
R1‑142808 | Reply LS on SFN handling in the dual connectivity | RAN3, Nokia Networks | Noted |
R1‑142809 | Reply LS on LTE Rel-12 UE feature list | RAN4, NTT DOCOMO | Noted |
R1‑142810 | Reply LS on Synchronization aspects for dual connectivity | RAN4, Ericsson | Noted |
R1‑142811 | LS on response SFN handling issue in dual connectivity | RAN4, Huawei | Noted |
R1‑142812 | Reply LS on Frequency Stability for D2D | RAN4, Qualcomm, Ericsson | Noted |
R1‑142813 | LS Out to RAN2 on introducing the new RSRQ measurements definition | RAN, Nokia | Noted |
R1‑142814 | Reply LS on Introducing the ProSe Authorized IE | SA2, Huawei | Noted |
R1‑142815 | Reply LS on ProSe Lawful Interception | SA5, Qualcomm | Noted |
R1‑142816 | 25.211 CR0315R1 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted - Revised |
R1‑142817 | 25.212 CR0328R1 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted - Revised |
R1‑142818 | 25.213 CR0117R1 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted - Revised |
R1‑142819 | Reply LS on introducing the EVS codec in MTSI | SA2, Ericsson | Noted |
R1‑142820 | LS Response on eNB knowledge of low complexity Ues | SA2, Ericsson | Noted |
R1‑142821 | Reply LS on D2D Multicarrier Capabilities | SA2, Qualcomm | Noted |
R1‑142822 | Final details for TBS entry design with 256QAM | Huawei, HiSilicon | Not treated |
R1‑142823 | Further discussion on UE categories with introduction of 256QAM | Huawei, HiSilicon | Not treated |
R1‑142824 | Discussion on I_MCS range for P/SI/RA-RNTI | Huawei, HiSilicon | Not treated |
R1‑142825 | Draft LS response on further clarifications on small cell on/off and discovery signal | Huawei, HiSilicon | Noted - Revised |
R1‑142826 | New L1 procedure for small cell on/off transition time further reduction | Huawei, HiSilicon | Not treated |
R1‑142827 | Remaining details related to DRS signal design | Huawei, HiSilicon | Not treated |
R1‑142828 | Discussion on network assistance signaling for small cell discovery | Huawei, HiSilicon | Not treated |
R1‑142829 | Remaining issues related to DRS-based RSRQ measurements | Huawei, HiSilicon | Not treated |
R1‑142830 | Evaluations and standards impacts of 256QAM for PMCH | Huawei, HiSilicon | Not treated |
R1‑142831 | Discussion on channel priority across CG for the remaining power in dual connectivity | Huawei, Hisilicon | Not treated |
R1‑142832 | Discussion on Look-ahead in Dual Connectivity | Huawei, Hisilicon | Not treated |
R1‑142833 | Power headroom calculation in dual connectivity | Huawei, Hisilicon | Not treated |
R1‑142834 | Details of reusing dual connectivity for PUCCH on Scell with CA | Huawei, HiSilicon | Not treated |
R1‑142835 | Scheduling assignment design for D2D communication | Huawei, HiSilicon | Not treated |
R1‑142836 | D2D data communication channel design | Huawei, HiSilicon | Not treated |
R1‑142837 | Frequency hopping for D2D communication | Huawei, HiSilicon | Noted |
R1‑142838 | SA content for D2D broadcast communication | Huawei, HiSilicon | Noted |
R1‑142839 | Mode 2 resource allocation for D2D | Huawei, HiSilicon | Noted |
R1‑142840 | DCI for D2D communication mode 1 | Huawei, HiSilicon | Noted |
R1‑142841 | Coverage definitions | Huawei, HiSilicon | Not treated |
R1‑142842 | Remaining details on power control | Huawei, HiSilicon | Noted |
R1‑142843 | Remaining details of D2D synchronization signals | Huawei, HiSilicon | Noted |
R1‑142844 | PD2DSCH design and content | Huawei, HiSilicon | Not treated |
R1‑142845 | D2D synchronization procedure for out-of-coverage | Huawei, HiSilicon | Not treated |
R1‑142846 | LS on ProSe direct services provisioning parameters | CT1, Qualcomm | Noted |
R1‑142847 | Remaining details of 256QAM and UE capability | Intel Corporation | Not treated |
R1‑142848 | On small cell on/off transition time reduction | Intel Corporation | Not treated |
R1‑142849 | Remaining details on small cell discovery signal | Intel Corporation | Noted |
R1‑142850 | On RRM measurement using small cell discovery signal | Intel Corporation | Not treated |
R1‑142851 | On small cell discovery signal based RSRQ measurement | Intel Corporation | Not treated |
R1‑142852 | Physical layer aspects of dual connectivity | Intel Corporation | Not treated |
R1‑142853 | Remaining details of D2D physical channel design | Intel Corporation | Not treated |
R1‑142854 | On D2D discovery resource size and repeated transmissions | Intel Corporation | Noted |
R1‑142855 | On the need for interference control mechanisms for Type 1 D2D discovery | Intel Corporation | Not treated |
R1‑142856 | Remaining details of Type 2B D2D discovery | Intel Corporation | Not treated |
R1‑142857 | Discussion on CQI enhancement for NAICS receivers | Intel Corporation | Not treated |
R1‑142858 | Remaining details of higher layer signaling for NAICS receivers | Intel Corporation | Noted |
R1‑142859 | Updated calibration results for 3D channel model | Intel Corporation | Noted |
R1‑142860 | On cell association in FD-MIMO systems | Intel Corporation | Not treated |
R1‑142861 | Potential performance of FD-MIMO and elevation beamforming | Intel Corporation | Not treated |
R1‑142862 | Discussion on UE category design for 256QAM | CMCC | Not treated |
R1‑142863 | Discussion on UE processing capability for 256QAM | CMCC | Not treated |
R1‑142864 | Discussion on the remaining TBS table design for 256QAM | CMCC | Not treated |
R1‑142865 | Discussion on small cell on/off procedure | CMCC | Withdrawn |
R1‑142866 | CSI feedback for NAICS receivers | CMCC | Not treated |
R1‑142867 | Remaining issues for NAICS higher layer signaling | CMCC | Not treated |
R1‑142868 | Phase II calibration results for 3D-MIMO | CMCC | Not treated |
R1‑142869 | Baseline performance evaluation for 3D-MIMO | CMCC | Noted |
R1‑142870 | On D2D scheduling assignment content and physical structure | Intel Corporation | Noted |
R1‑142871 | Resource allocation for Mode-2 D2D operation | Intel Corporation | Noted |
R1‑142872 | Resource allocation for Mode-1 D2D operation | Intel Corporation | Not treated |
R1‑142873 | On disadvantages of ZC based sequence for initial D2D synchronization | Intel Corporation | Not treated |
R1‑142874 | Design of D2D Synchronization Signal (D2DSS) | Intel Corporation | Noted |
R1‑142875 | On Design of D2D Synchronization Channel (PD2DSCH) | Intel Corporation | Not treated |
R1‑142876 | Synchronization Procedure for D2D Communication | Intel Corporation | Not treated |
R1‑142877 | Analysis of multi-hop synchronization procedure | Intel Corporation | Not treated |
R1‑142878 | Corrections on UL-reference UL/DL configuration | CATT | Noted - Revised |
R1‑142879 | Corrections on UL-reference UL/DL configuration | CATT | Revised |
R1‑142880 | Corrections for TDD eIMTA | CATT | Noted - Revised |
R1‑142881 | eIMTA UE capability and configurations | CATT | Noted |
R1‑142882 | Remaining issues on 256QAM for small cells | CATT | Not treated |
R1‑142883 | Remaining details of discovery signal design | CATT | Not treated |
R1‑142884 | Procedures for discovery signal based RRM measurements | CATT | Not treated |
R1‑142885 | Discovery signal based RSRQ measurements | CATT | Not treated |
R1‑142886 | PDCCH common search space in SCG | CATT | Not treated |
R1‑142887 | Open issues on PHR in dual connectivity | CATT | Not treated |
R1‑142888 | Details of power control aspect in dual connectivity | CATT | Not treated |
R1‑142889 | Support of PUCCH on Scell for CA | CATT | Not treated |
R1‑142890 | D2D power control | CATT | Not treated |
R1‑142891 | D2D power control by TPC command | CATT | Noted |
R1‑142892 | Resource allocation for D2D synchronization signal | CATT | Not treated |
R1‑142893 | Design of D2DSS and PD2DSCH | CATT | Noted |
R1‑142894 | Discussion on D2D synchronization sources | CATT | Not treated |
R1‑142895 | Considerations on D2D synchronization procedure | CATT | Not treated |
R1‑142896 | Resource allocation for Type 1 D2D discovery | CATT | Not treated |
R1‑142897 | Frequency hopping design in D2D communication | CATT | Not treated |
R1‑142898 | SA transmission in D2D communication | CATT | Not treated |
R1‑142899 | T-RPT design for D2D communication | CATT | Noted |
R1‑142900 | Contention method for mode 2 resource allocation | CATT | Noted |
R1‑142901 | Linkage between SA and data resource of D2D communication | CATT | Not treated |
R1‑142902 | Resource pool allocation for D2D communication | CATT | Withdrawn |
R1‑142903 | Consideration on TDD-related issues for NAICS receiver | CATT | Noted |
R1‑142904 | Further consideration on higher-layer signaling for NAICS receiver | CATT | Not treated |
R1‑142905 | Support of fallback operation for NAICS | CATT | Revised |
R1‑142906 | CSI feedback for NAICS | CATT | Not treated |
R1‑142907 | Phase 2 calibration results of 3D channel model | CATT | Not treated |
R1‑142908 | Baseline calibration results of 3D channel model | CATT | Not treated |
R1‑142909 | PDCCH common search space on SeNB | Hitachi Ltd. | Not treated |
R1‑142910 | 25.215 DraftCR (Rel-12, B) Introduction of RCPI and RSNI measurements for WLAN/3GPP Radio Interworking | Intel Corporation | Not treated |
R1‑142911 | 25.225 DraftCR (Rel-12, B) Introduction of RCPI and RSNI measurements for WLAN/3GPP Radio Interworking | Intel Corporation | Not treated |
R1‑142912 | 36.214 DraftCR (Rel-12, B) Introduction of RCPI and RSNI measurements for WLAN/3GPP Radio Interworking | Intel Corporation | Not treated |
R1‑142913 | Clarification on rate-matching of PUSCH in UL CA | Intel Corporation | Noted |
R1‑142914 | Views on L1 procedure for small cell on/off transition time reduction | MediaTek Inc. | Not treated |
R1‑142915 | Remaining details of discovery signal design and network assistance | MediaTek Inc. | Not treated |
R1‑142916 | On dicovery signal based RSRQ-like measurement | MediaTek Inc. | Not treated |
R1‑142917 | Discussion on CSI enhancement for NAICS receivers | MediaTek Inc. | Not treated |
R1‑142918 | Remaining issues on HL-signaling parameters for NAICS | MediaTek Inc. | Not treated |
R1‑142919 | Narrow band LTE for MTC in LTE Rel-13 | MediaTek Inc. | Not treated |
R1‑142920 | D2D control needed for broadcast communication | General Dynamics UK | Not treated |
R1‑142921 | D2D physical channel design | General Dynamics UK | Not treated |
R1‑142922 | D2D resource allocation for synchronisation signals and channels | General Dynamics UK | Not treated |
R1‑142923 | D2D synchronisation signal and channel design | General Dynamics UK | Not treated |
R1‑142924 | D2D synchronisation procedure | General Dynamics UK | Withdrawn |
R1‑142925 | Discussion of on/off transitions and related procedures | Fujitsu | Not treated |
R1‑142926 | Configuration of DRS | Fujitsu | Not treated |
R1‑142927 | Discussion on DRS-based RSRQ-like measurement | Fujitsu | Not treated |
R1‑142928 | Discussion of control signaling for D2D broadcast | Fujitsu | Not treated |
R1‑142929 | RPT design for D2D communication | Fujitsu | Noted |
R1‑142930 | Miscellaneous points on open physical channel aspects | Fujitsu | Not treated |
R1‑142931 | Discussion on RRM measurement for D2D communication | Fujitsu | Not treated |
R1‑142932 | Distributed resource allocation for D2D broadcast | Fujitsu | Not treated |
R1‑142933 | eNB controlled resource allocation for D2D broadcast | Fujitsu | Not treated |
R1‑142934 | Design of D2DSS and PD2DSCH | Fujitsu | Noted |
R1‑142935 | Discussion on D2D Synchronization Procedure | Fujitsu | Not treated |
R1‑142936 | Phase 2 and 3 calibration results for 3D channel modeling | Fujitsu | Not treated |
R1‑142937 | Comparison of Hierarchical and Flat Synchronization Procedures | CEWiT | Not treated |
R1‑142938 | Draft LS on TP for D2D for TS 36.300 | Qualcomm Inc. | Noted |
R1‑142939 | Draft LS on ProSe provisioning parameters | Qualcomm Inc. | Noted - Revised |
R1‑142940 | Discussion on ProSe provisioning parameters | Qualcomm Inc. | Noted |
R1‑142941 | Discussion of LS on WiFi measurements | Qualcomm Inc. | Withdrawn |
R1‑142942 | Draft Rel-12 CR, handling of IMR in eIMTA | Qualcomm Inc. | Noted |
R1‑142943 | 256QAM switch point | Qualcomm Inc. | Not treated |
R1‑142944 | UE Category handling for 256QAM | Qualcomm Inc. | Not treated |
R1‑142945 | Small cell on/off time reduction | Qualcomm Inc. | Not treated |
R1‑142946 | Detailed design of DRS | Qualcomm Inc. | Not treated |
R1‑142947 | Discovery signal-based RRM measurement procedures | Qualcomm Inc. | Not treated |
R1‑142948 | Discovery signal-based RSRQ-like measurement | Qualcomm Inc. | Not treated |
R1‑142949 | Power control for dual-connectivity | Qualcomm Inc. | Not treated |
R1‑142950 | Power control processing time requirements for dual-connectivity | Qualcomm Inc. | Not treated |
R1‑142951 | Power headroom report for dual-connectivity | Qualcomm Inc. | Not treated |
R1‑142952 | SCH prioritization for dual-connectivity with UE processing capability limitation | Qualcomm Inc. | Not treated |
R1‑142953 | Remaining details for PUCCH on Scell | Qualcomm Inc. | Not treated |
R1‑142954 | Remaining open issues for D2D | Qualcomm Inc. | Not treated |
R1‑142955 | Control for D2D broadcast communication | Qualcomm Inc. | Noted |
R1‑142956 | Hopping for D2D communication | Qualcomm Inc. | Noted |
R1‑142957 | D2D discovery for asynchronous networks | Qualcomm Inc. | Not treated |
R1‑142958 | Resource allocation for Type 1 D2D discovery | Qualcomm Inc. | Not treated |
R1‑142959 | Resource allocation for Mode 2 D2D broadcast communication | Qualcomm Inc. | Noted |
R1‑142960 | Resource allocation for Type 2B D2D discovery | Qualcomm Inc. | Noted |
R1‑142961 | Resource allocation for Mode 1 D2D broadcast communication | Qualcomm Inc. | Not treated |
R1‑142962 | Simulation results for D2D and WAN coexistence | Qualcomm Inc. | Not treated |
R1‑142963 | Resource allocation for D2D Synchronization | Qualcomm Inc. | Not treated |
R1‑142964 | Signal Design for D2D Synchronization | Qualcomm Inc. | Not treated |
R1‑142965 | Procedures for D2D synchronization | Qualcomm Inc. | Not treated |
R1‑142966 | Draft TP for D2D for TS 36.300 | Qualcomm Inc. | Noted |
R1‑142967 | CSI measurement and reporting for NAICS | Qualcomm Inc. | Not treated |
R1‑142968 | Remaining details for NAICS | Qualcomm Inc. | Not treated |
R1‑142969 | RCPI and RSNI measurements | Qualcomm Inc. | Not treated |
R1‑142970 | Remaining issues on calibration and baseline results | Qualcomm Inc. | Not treated |
R1‑142971 | Draft CR for 36.212 on 256QAM and LC-MTC | Huawei | Noted - Revised |
R1‑142972 | On specification changes for introducing the new category UEs for MTC | Huawei, HiSilicon | Noted |
R1‑142973 | [Draft] LS to RAN2 on 36.306 for 256QAM | Huawei, HiSilicon | Not treated |
R1‑142974 | Discussion on further clarifications on small cell on/off and discovery signal | Huawei, HiSilicon | Noted |
R1‑142975 | Considerations and comparison of fast on/off schemes | Huawei, HiSilicon | Not treated |
R1‑142976 | SRS processing in power allocation for Dual Connectivity | Huawei, Hisilicon | Not treated |
R1‑142977 | Power allocation with non look-ahead | Huawei, Hisilicon | Not treated |
R1‑142978 | Further discussion on the UE processing capabilities in dual connectivity | Huawei, Hisilicon | Not treated |
R1‑142979 | Power headroom report in in asynchronous case | Huawei, Hisilicon | Not treated |
R1‑142980 | D2D discovery signal design | Huawei, HiSilicon | Noted |
R1‑142981 | On the timing advance signaling for D2D | Huawei, HiSilicon | Not treated |
R1‑142982 | Evaluation on Mode 2 resource allocation for D2D | Huawei, HiSilicon | Noted |
R1‑142983 | Email discussion summary of Type 2B hopping pattern | Huawei, HiSilicon | Noted |
R1‑142984 | Comparisons of hopping patterns for type 2B D2D discovery | Huawei, HiSilicon | Noted |
R1‑142985 | Coexistence of WAN and D2D | Huawei, HiSilicon | Not treated |
R1‑142986 | Resources for D2D synchronization signals | Huawei, HiSilicon | Not treated |
R1‑142987 | Synchronization procedure for D2D | Huawei, HiSilicon | Not treated |
R1‑142988 | The feasibility of current CQI definition for NAICS receiver | Huawei, HiSilicon | Not treated |
R1‑142989 | Remaining issues on network assistance signalling parameters | Huawei, HiSilicon | Not treated |
R1‑142990 | Introduction of RCPI and RSNI measurements | Huawei, HiSilicon | Not treated |
R1‑142991 | Phase 2 calibration results for 3D channel model | Huawei, HiSilicon | Not treated |
R1‑142992 | Baseline performance evaluation results for 3D channel model | Huawei, HiSilicon | Noted |
R1‑142993 | Discussion on CP configuration | Lenovo | Not treated |
R1‑142994 | Synchronization signal design for D2D | Lenovo | Not treated |
R1‑142995 | Procedure for small cell on/off transition time reduction | Panasonic | Not treated |
R1‑142996 | TPC on dual connectivity | Panasonic | Not treated |
R1‑142997 | Timing advance in D2D | Panasonic | Not treated |
R1‑142998 | Discussion for further details on D2D grant design in mode 1 resource allocation | Panasonic | Noted |
R1‑142999 | T-RPT design of data | Panasonic | Not treated |
R1‑143000 | Time/frequency hopping for D2D^^communication/SA | Panasonic | Not treated |
R1‑143001 | MCS in mode 1 in D2D | Panasonic | Not treated |
R1‑143002 | Power control for in-coverage mode 1/2 in D2D | Panasonic | Not treated |
R1‑143003 | Evaluation of D2D and WAN co-existence with D2D power control | Panasonic | Not treated |
R1‑143004 | Rough synchronization procedure in D2D | Panasonic | Not treated |
R1‑143005 | Measurements for WLAN/UTRAN Radio Interworking | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143006 | 256QAM for PMCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143007 | Some Remaining Details for supporting 256QAM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143008 | System design for transition time reduction and legacy UEs impacts for small cell ON/OFF | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143009 | Discovery signals design for small cell on/off | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143010 | Discovery signals procedure for small cell on/off | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143011 | DRS RSRQ definition | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143012 | UL Power Control and Power Scaling for Dual Connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143013 | Common Search Space on SeNB for Dual Connectivity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143014 | Scheduling Assignment (SA) design | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143015 | System Control for D2D broadcast communication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143016 | Frequency Hopping pattern for D2D communication channel | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑143017 | Channel design for D2D discovery | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143018 | Design and evaluation of T-RPT pattern for D2D communication channel | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑143019 | Resource allocation and selection for Scheduling Assignment for D2D communication | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143020 | Discovery Resource selection for Type 1 resource allocation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143021 | DCI format design for D2D resource allocation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑143022 | Definition of in-coverage, out-of-coverage, and edge-of-cell coverage | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑143023 | Evaluation of Impact of D2D to WAN system performance | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143024 | Resource Allocation and Design for D2D Synchronization Signals | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143025 | PD2DSCH design for D2D broadcast communication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143026 | D2D Synchronization Procedure | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143027 | CSI enhancement for NAICS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143028 | Considerations on higher-layer signalling for NAICS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143029 | Measurements for WLAN/E-UTRAN Radio Interworking | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143030 | Considerations for 3D channel modelling and Calibration Results | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143031 | Remaining Details on UL Power Control in Dual Connectivity | HTC | Not treated |
R1‑143032 | Discussion on eNB Resource Allocation for Mode-1 D2D Communication | HTC | Not treated |
R1‑143033 | Multiplexing between UL HARQ-ACK and D2D signals | HTC | Not treated |
R1‑143034 | D2D synchronization procedure in varied coverage | HTC | Not treated |
R1‑143035 | Remaining details on support of inter-cell D2D discovery | Intel Corporation | Not treated |
R1‑143036 | 36.214 DraftCR (Rel-12, B) Introduction of RSSI measurements for WLAN/3GPP Radio Interworking | Intel Corporation | Not treated |
R1‑143037 | 25.215 DraftCR (Rel-12, B) Introduction of RSSI measurements for WLAN/3GPP Radio Interworking | Intel Corporation | Not treated |
R1‑143038 | 25.225 DraftCR (Rel-12, B) Introduction of RSSI measurements for WLAN/3GPP Radio Interworking | Intel Corporation | Not treated |
R1‑143039 | Remaining issue of DL-FET | MediaTek Inc. | Noted |
R1‑143040 | Proposal for CM design of DL basic configuration | MediaTek Inc. | Noted |
R1‑143041 | Analysis on SIR target for DL power control in DL basic configuration | MediaTek Inc. | Noted |
R1‑143042 | Discussion on the multiplexing of UL cellular and D2D signals | ITRI | Not treated |
R1‑143043 | RSSI measurement based on discovery signal | ITRI | Not treated |
R1‑143044 | A Consideration of OFDM vs. SC-FDM based on PSS-structured D2DSS | ITRI | Not treated |
R1‑143045 | Timing Offset and Carrier Frequency Offset Impacts to OFDM-based PSS Detection Algorithms | ITRI | Not treated |
R1‑143046 | DRS based RRM measurement and network assistance information | ETRI | Not treated |
R1‑143047 | DRS based RSRQ measurement | ETRI | Not treated |
R1‑143048 | UL power control and PHR in dual connectivity | ETRI | Not treated |
R1‑143049 | A control signaling needed to support sensing based random resource selection for SA transmission | ETRI | Not treated |
R1‑143050 | DMRS Scrambling of SA for Reducing UE Power Consumption | ETRI | Not treated |
R1‑143051 | Discussion of sensing algorithms for mode 2 resource selection | ETRI | Noted |
R1‑143052 | D2D synchronization procedure considering timing adjustment for out-of-coverage | ETRI | Not treated |
R1‑143053 | Discussion on transmission timing of D2D communications for in-coverage UEs | ETRI | Not treated |
R1‑143054 | Discussion on UCI embedding on PUSCH | Samsung | Noted |
R1‑143055 | DRAFT CR to 36.213 (Rel-11, F) Correction to UCI embedding in case of a single serving cell and simultaneous PUSCH and PUCCH transmission | Samsung | Rejected |
R1‑143056 | DRAFT CR to 36.213 (Rel-12, A) Correction to UCI embedding in case of a single serving cell and simultaneous PUSCH and PUCCH transmission | Samsung | Revised |
R1‑143057 | Draft CR on DMRS sequence generation when TM7 is overlapped with EPDCCH (Rel11) | Samsung | Revised |
R1‑143058 | Draft CR on DMRS sequence generation when TM7 is overlapped with EPDCCH (Rel12) | Samsung | Revised |
R1‑143059 | Discussion on TM7 PDSCH and EPDCCH overlapping | Samsung | Noted |
R1‑143060 | Draft CR on HARQ-ACK Multiplexing in PUSCH for TDD-FDD CA | Samsung | Noted - Revised |
R1‑143061 | Draft CR on inclusion of IHARQ-ACKoffset,set2 for UL Power Control Subframe Set 2 | Samsung | Noted |
R1‑143062 | Fallback Operation for CSI Reporting in eIMTA | Samsung | Noted |
R1‑143063 | UE category/capability for 256QAM | Samsung | Not treated |
R1‑143064 | Remaining issues of MCS/CQI/TBS table for 256QAM | Samsung | Not treated |
R1‑143065 | Discussion on 256QAM related signalling/procedure | Samsung | Not treated |
R1‑143066 | Procedures for small cell on/off transition time reduction | Samsung | Not treated |
R1‑143067 | Detailed design of discovery signal | Samsung | Not treated |
R1‑143068 | Discovery signal-based RRM measurement procedures | Samsung | Not treated |
R1‑143069 | Discovery signal-based RSRQ-like measurement | Samsung | Not treated |
R1‑143070 | Remaining Aspects for UL Power Control in Dual Connectivity | Samsung | Not treated |
R1‑143071 | Remaining Aspects for PHR in Dual Connectivity | Samsung | Not treated |
R1‑143072 | Information Prioritization under Power Limitation for Dual Connectivity | Samsung | Not treated |
R1‑143073 | PDCCH Common Search Space on SCG | Samsung | Not treated |
R1‑143074 | PUCCH Support on a pSCell for CA | Samsung | Not treated |
R1‑143075 | Discussion of TA in D2D SA | Samsung | Not treated |
R1‑143076 | Control information needed for broadcast communication transmission/reception | Samsung | Not treated |
R1‑143077 | Discussions on ID(s) in SA | Samsung | Noted |
R1‑143078 | Discussion on CP length for D2D discovery and data channels | Samsung | Not treated |
R1‑143079 | Details on scrambling sequence generation | Samsung | Revised |
R1‑143080 | Collision avoidance mechanism for Mode 2 communication | Samsung | Noted |
R1‑143081 | Resource pool configuration for type-1 discovery | Samsung | Not treated |
R1‑143082 | WAN and D2D priority handling for type-1 discovery | Samsung | Not treated |
R1‑143083 | Discovery operation with D2DSS configured | Samsung | Not treated |
R1‑143084 | Mode 2 resource allocation for D2D broadcast communication | Samsung | Noted |
R1‑143085 | Time-frequency hopping design for Mode 2 resource allocation | Samsung | Not treated |
R1‑143086 | On D2D communication related to out-of-coverage UE with TX timing not from eNB | Samsung | Not treated |
R1‑143087 | Further discussion on Mode 1 power control | Samsung | Not treated |
R1‑143088 | Mode 1 resource allocation for D2D broadcast communication | Samsung | Not treated |
R1‑143089 | Time-frequency hopping design for Mode 1 resource allocation | Samsung | Not treated |
R1‑143090 | Resource allocation for type 2B discovery | Samsung | Revised |
R1‑143091 | Soft buffer handling for PDSCH and D2D | Samsung | Not treated |
R1‑143092 | Definition of in-coverage in RAN2 agreements | Samsung | Not treated |
R1‑143093 | RSRP based resource grouping for D2D type-1 discovery | Samsung | Not treated |
R1‑143094 | HARQ-ACK transmission of PDSCH when D2D subframes are configured | Samsung | Withdrawn |
R1‑143095 | Power prioritization for D2D and WAN CA | Samsung | Not treated |
R1‑143096 | Resource structure for D2D synchronization signals and channels | Samsung | Not treated |
R1‑143097 | Resource allocation for synchronization signal to assist D2D discovery/communication in asynchronous network | Samsung | Noted |
R1‑143098 | Discussion on D2DSS design | Samsung | Not treated |
R1‑143099 | PD2DSS structure with repeated PSS symbol | Samsung | Not treated |
R1‑143100 | D2D synchronization signal and channel design, considering information indication | Samsung | Not treated |
R1‑143101 | Procedures for D2D frame number alignment | Samsung | Not treated |
R1‑143102 | Discussion on transmit and reception timing for Type 2B discovery | Samsung | Not treated |
R1‑143103 | Silent and scanning period for D2D synchronization | Samsung | Not treated |
R1‑143104 | D2D synchronization procedure for in-network coverage | Samsung | Not treated |
R1‑143105 | D2D synchronization procedure for partial network coverage | Samsung | Not treated |
R1‑143106 | D2D synchronization procedure for out-of-network coverage | Samsung | Not treated |
R1‑143107 | D2D Synchronization Procedure in “Exceptional Cases” | Samsung | Not treated |
R1‑143108 | Further discussions on RRC parameters for D2D | Samsung | Not treated |
R1‑143109 | Discussion on CSI enhancement for NAICS | Samsung | Not treated |
R1‑143110 | Remaining details on higher-layer signalling for NAICS | Samsung | Not treated |
R1‑143111 | Baseline calibration results | Samsung | Not treated |
R1‑143112 | Phase 2 calibration results | Samsung | Noted |
R1‑143113 | Discussion on dynamic power allocation priority rules for power limited UEs | Fujitsu | Not treated |
R1‑143114 | Remaining aspects of small cell on/off | NVIDIA | Not treated |
R1‑143115 | Remaining details of DRS configuration | NVIDIA | Not treated |
R1‑143116 | DRS measurement definitions | NVIDIA | Not treated |
R1‑143117 | CQI definition for NAICS | NVIDIA | Not treated |
R1‑143118 | Remaining details of NAICS higher-layer signaling | NVIDIA | Not treated |
R1‑143119 | Signaling aspects of 4-Tx support for NAICS | NVIDIA | Not treated |
R1‑143120 | Baseline performance results for 3D-channel model | NVIDIA | Not treated |
R1‑143121 | L1 procedure for small cell on/off | Sharp | Not treated |
R1‑143122 | On the design of the discovery signal | Sharp | Not treated |
R1‑143123 | Discovery RSSI definition for discovery signal based RSRQ | Sharp | Not treated |
R1‑143124 | UL power allocation for dual connectivity | Sharp | Not treated |
R1‑143125 | Channel dropping and conversion in UL power allocation for dual connectivity | Sharp | Not treated |
R1‑143126 | Consideration on Configurable CP Length for D2D Transmission | Sharp | Not treated |
R1‑143127 | Remaining issues on D2D transmission timing | Sharp | Not treated |
R1‑143128 | Remaining issues on power control for D2D communication | Sharp | Not treated |
R1‑143129 | On the downlink 256QAM tables | ZTE | Not treated |
R1‑143130 | UE category design for 256QAM | ZTE | Not treated |
R1‑143131 | Discussion on CSI feedback enhancement for NAICS | ZTE | Not treated |
R1‑143132 | Remaining issues of higher-layer signalling for NAICS | ZTE | Not treated |
R1‑143133 | New L1 Procedures for small cell on/off transition time reduction | ZTE | Not treated |
R1‑143134 | On DRS based RSRQ-like measurement | ZTE | Not treated |
R1‑143135 | Discussion on T-RPT scheme for Mode 1 and Mode 2 | ZTE | Noted |
R1‑143136 | SA pattern design | ZTE | Not treated |
R1‑143137 | Discussion on discovery resource size and repetition | ZTE | Not treated |
R1‑143138 | SA and Data Resource Selection for D2D Communication Mode 2 | ZTE | Not treated |
R1‑143139 | Hopping pattern and resource allocation for type 2B discovery | ZTE | Not treated |
R1‑143140 | D2D grant design for communication mode 1 | ZTE | Not treated |
R1‑143141 | Resource allocation for synchronization signal and channel | ZTE | Not treated |
R1‑143142 | D2D Synchronization Signal and Channel Design | ZTE | Noted |
R1‑143143 | Discussion on Synchronization for Discovery | ZTE | Not treated |
R1‑143144 | Discussion on calibration and baseline results | ZTE | Revised |
R1‑143145 | Remaining issues on Dual Connectivity | ZTE | Not treated |
R1‑143146 | Parallel random access preamble transmissions in dual connectivity | ZTE | Not treated |
R1‑143147 | Summary of email discussion on NAICS higher-layer signaling | MediaTek Inc. | Revised |
R1‑143148 | Remaining CSI measurement/feedback issue of discovery reference signal | NEC | Not treated |
R1‑143149 | Views on inter-eNB coordination of DRS measurement timing configuration | NEC | Not treated |
R1‑143150 | Views on DRS duration | NEC | Not treated |
R1‑143151 | On support of PUCCH on SCell for CA | NEC | Not treated |
R1‑143152 | On resource selection for Type 1 discovery message transmission | NEC | Not treated |
R1‑143153 | Distributed resource allocation and pre-emption access for Mode2 communication | NEC | Not treated |
R1‑143154 | D2D and cellular resource multiplexing configuration | NEC | Not treated |
R1‑143155 | D2D synchronization procedure for out-of-network coverage | NEC | Not treated |
R1‑143156 | Smooth mode transition for in-coverage D2D UEs | III | Not treated |
R1‑143157 | Views on remaining power headroom issues in Dual Connectivity | KDDI | Not treated |
R1‑143158 | Discussion on selection/reselection of D2DSS | KDDI | Not treated |
R1‑143159 | Discussion on triggering condition for D2DSS transmission | KDDI | Not treated |
R1‑143160 | Discussion on inter-cell discovery in asynchronous networks | KDDI | Not treated |
R1‑143161 | Clarification of PUSCH rate matching with SRS | LG Electronics | Revised |
R1‑143162 | Draft CR for clarification of DCI fields in TDD-FDD CA operation | LG Electronics | Noted |
R1‑143163 | Draft TS36.213CR Correction on beta_{offset}^{HARQ-ACK} determination for a UE configured with two uplink power control subframe sets | LG Electronics | Noted - Revised |
R1‑143164 | Draft TS36.213CR Correction on ModeA-uplink/downlink determination for a UE configured with TDD eIMTA | LG Electronics | Noted |
R1‑143165 | Remaining issue for 256QAM CQI/MCS/TBS table design | LG Electronics | Not treated |
R1‑143166 | UE capability/category to support 256QAM | LG Electronics | Not treated |
R1‑143167 | Further discussions on new L1 procedure to support fast time-scale ON/OFF operation | LG Electronics | Not treated |
R1‑143168 | Remaining issues related to cell on/off for hand-over and dual connectivity scenarios | LG Electronics | Not treated |
R1‑143169 | Remaining issues on DRS design details | LG Electronics | Not treated |
R1‑143170 | DRS-based measurement procedures with network assistance | LG Electronics | Not treated |
R1‑143171 | DRS based RSRQ measurement related issues | LG Electronics | Not treated |
R1‑143172 | Further details on power control in dual connectivity | LG Electronics | Not treated |
R1‑143173 | Remaining issues on power headroom reporting for dual connectivity | LG Electronics | Not treated |
R1‑143174 | Remaining RAN1 issues on dual connectivity | LG Electronics | Not treated |
R1‑143175 | UE capability to support dual connectivity | LG Electronics | Not treated |
R1‑143176 | Detailed design of scheduling assignment for D2D communication | LG Electronics | Noted |
R1‑143177 | Detailed design of signaling for D2D communication resource allocation | LG Electronics | Noted |
R1‑143178 | Remaining issues for D2D physical channel design | LG Electronics | Not treated |
R1‑143179 | Discussion on resource allocation for D2D mode 2 communication | LG Electronics | Not treated |
R1‑143180 | Remaining issues on resource allocation for Type 1 discovery | LG Electronics | Revised |
R1‑143181 | UE Procedure in Mode 1 Communication | LG Electronics | Not treated |
R1‑143182 | D2D Grant in Mode 1 Communication | LG Electronics | Not treated |
R1‑143183 | Discussion on resource allocation for Type 2B discovery | LG Electronics | Revised |
R1‑143184 | Discussion on the Coverage Definition in D2D Communications | LG Electronics | Not treated |
R1‑143185 | Remaining issues in supporting D2D over multiple carriers | LG Electronics | Noted |
R1‑143186 | HARQ-ACK transmission shift for D2D and WAN co-existence | LG Electronics | Revised |
R1‑143187 | Other Remaining Issues for D2D and WAN co-existence | LG Electronics | Not treated |
R1‑143188 | Discussion on resource allocation for D2D synchronization | LG Electronics | Not treated |
R1‑143189 | Discussion on synchronization signal design | LG Electronics | Not treated |
R1‑143190 | Discussion on PD2DSCH design | LG Electronics | Not treated |
R1‑143191 | Evaluation results on the D2D synchronization procedure | LG Electronics | Not treated |
R1‑143192 | Discussion on UE procedures for D2DSS transmission and reception | LG Electronics | Not treated |
R1‑143193 | Remaining issues on D2D timing | LG Electronics | Not treated |
R1‑143194 | Considerations on supporting inter-cell D2D operations | LG Electronics | Not treated |
R1‑143195 | Further discussion on CSI enhancement for NAICS | LG Electronics | Not treated |
R1‑143196 | Consideration on the number of candidate interferers and UE capability | LG Electronics | Not treated |
R1‑143197 | Remaining details on higher-layer signaling for NAICS | LG Electronics | Not treated |
R1‑143198 | Discussion on CSI-RS and QCL signaling for NAICS | LG Electronics | Not treated |
R1‑143199 | Evaluation results for phase 2 calibration | LG Electronics | Not treated |
R1‑143200 | Design of discovery signals | Microsoft Corporation | Not treated |
R1‑143201 | Discovery signal based RRM measurement procedures | Microsoft Corporation | Not treated |
R1‑143202 | Remaining issues of SA content for D2D broadcast communication | Microsoft Corporation | Not treated |
R1‑143203 | Remaining issues of Mode 1 resource allocation | Microsoft Corporation | Not treated |
R1‑143204 | HARQ-ACK transmission for UE working in D2D communication Mode 1 | Microsoft Corporation | Not treated |
R1‑143205 | Issues in D2D synchronization procedures | Microsoft Corporation | Not treated |
R1‑143206 | Discussion on the fast small cell on/off | Coolpad | Not treated |
R1‑143207 | Time Association Consideration for D2D SA and Data | Sharp | Not treated |
R1‑143208 | D2D Grant Size and Contents for Mode 1 | Sharp | Not treated |
R1‑143209 | D2D Grant Design for T-RPT | Sharp | Not treated |
R1‑143210 | D2D Synchonization Signal Transmission for Partial Coverage | Sharp | Not treated |
R1‑143211 | Considerations of UE Category for 256QAM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143212 | Updates on Rel-12 UE capabilities | NTT DOCOMO | Noted |
R1‑143213 | Further views on UE categories for 256QAM | NTT DOCOMO | Not treated |
R1‑143214 | Views on new L1 procedure for small cell on/off | NTT DOCOMO | Not treated |
R1‑143215 | Views on detailed design of discovery signal(s) | NTT DOCOMO | Not treated |
R1‑143216 | Views on discovery signal-based RRM measurement procedures | NTT DOCOMO | Not treated |
R1‑143217 | Views on discovery signal-based RSRQ measurement | NTT DOCOMO | Not treated |
R1‑143218 | Summary of email discussion [77-13]: Details of PxeNB for power-control of dual connectivity | NTT DOCOMO | Not treated |
R1‑143219 | Summary of email discussion [77-15]: PHR for dual connectivity | NTT DOCOMO | Not treated |
R1‑143220 | Common search space for SCG serving cell(s) | NTT DOCOMO | Not treated |
R1‑143221 | Details of guaranteed power PMeNB and PSeNB | NTT DOCOMO | Not treated |
R1‑143222 | Handling of remaining power for dual connectivity | NTT DOCOMO | Not treated |
R1‑143223 | Details of PHR aspects in dual connectivity | NTT DOCOMO | Not treated |
R1‑143224 | PRACH power-control for dual connectivity | NTT DOCOMO | Not treated |
R1‑143225 | SRS power-control for dual connectivity | NTT DOCOMO | Not treated |
R1‑143226 | Remaining FFS of SCell PUCCH for carrier aggregation | NTT DOCOMO | Not treated |
R1‑143227 | On capability aspects of dual connectivity and SCell PUCCH for CA | NTT DOCOMO | Not treated |
R1‑143228 | Discussion on resource selection for Type 1 discovery | NTT DOCOMO | Not treated |
R1‑143229 | On resource allocation and timing of Type 2B discovery | NTT DOCOMO | Not treated |
R1‑143230 | Further Views on CSI Enhancements for NAICS | NTT DOCOMO | Not treated |
R1‑143231 | Views on Higher Layer Signaling for NAICS | NTT DOCOMO | Not treated |
R1‑143232 | Baseline results on 3D channel model | NTT DOCOMO | Not treated |
R1‑143233 | DRS-based RSSI measurements | InterDigital | Not treated |
R1‑143234 | Remaining prioritization issues for Dual Connectivity power allocation | InterDigital | Not treated |
R1‑143235 | Definition, range and resolution for PxeNB in Dual Connectivity | InterDigital | Not treated |
R1‑143236 | Remaining issues on power headroom reporting for Dual Connectivity | InterDigital | Not treated |
R1‑143237 | Phase 2 calibration and baseline results for 3D channel model | InterDigital | Not treated |
R1‑143238 | On distributed resource allocation for D2D | InterDigital | Withdrawn |
R1‑143239 | Conditions to use mode 2 in IDLE | CMCC | Not treated |
R1‑143240 | TDD Aspects for NAICS | CMCC | Not treated |
R1‑143241 | On the final 256QAM table & configuration details | Nokia Corporation, Nokia Networks | Not treated |
R1‑143242 | On procedures for small cell on/off transition time reduction | Nokia Networks, Nokia Corporation | Not treated |
R1‑143243 | On detailed design of Discovery Signals | Nokia Networks, Nokia Corporation | Not treated |
R1‑143244 | On DRS based RRM measurement procedures | Nokia Networks, Nokia Corporation | Not treated |
R1‑143245 | Remaining issues of dual connectivity | Nokia Networks, Nokia Corporation | Not treated |
R1‑143246 | Further discussion on scheduling assignments | Nokia Corporation, Nokia Networks | Not treated |
R1‑143247 | Patterns for scheduling assignments | Nokia Corporation, Nokia Networks | Not treated |
R1‑143248 | Timing and resource pools of Type 2B discovery signals | Nokia Corporation, Nokia Networks | Not treated |
R1‑143249 | Dynamic control of D2D discovery resources | Nokia Corporation, Nokia Networks | Not treated |
R1‑143250 | Randomization and performance for discovery Type 2B | Nokia Networks, Nokia Corporation | Noted |
R1‑143251 | Pattern design and resource allocation signaling for discovery Type 2B | Nokia Networks, Nokia Corporation | Noted |
R1‑143252 | On remaining details of D2D transmission power control | Nokia Networks, Nokia Corporation | Noted |
R1‑143253 | D2D synchronization signal design | Nokia Networks, Nokia Corporation | Not treated |
R1‑143254 | Synchronization procedure for D2D communication and discovery | Nokia Corporation, Nokia Networks | Not treated |
R1‑143255 | On NAICS CSI feedback | Nokia Networks, Nokia Corporation | Not treated |
R1‑143256 | Remaining open issues on network assistance for NAICS receivers | Nokia Networks, Nokia Corporation | Not treated |
R1‑143257 | Phase-2 calibration and baseline results | Nokia Networks, Nokia Corporation | Not treated |
R1‑143258 | Summary of phase-2 calibration and baseline results | Nokia Networks, Nokia Corporation | Revised |
R1‑143259 | Public safety concerns on D2D resource allocation | U.S. Department Of Commerce | Noted |
R1‑143260 | Public safety D2D multicarrier operations | U.S. Department Of Commerce | Noted |
R1‑143261 | Scheduling assignment design | Kyocera | Not treated |
R1‑143262 | Physical resource design for D2D discovery | Kyocera | Not treated |
R1‑143263 | SA and Data linkage for Mode 2 | Kyocera | Not treated |
R1‑143264 | Resource allocation for Type 1 discovery | Kyocera | Not treated |
R1‑143265 | SA and Data linkage for Mode 1 | Kyocera | Not treated |
R1‑143266 | Synchronization signal and channel design | Kyocera | Not treated |
R1‑143267 | Synchronization procedure | Kyocera | Not treated |
R1‑143268 | 25.212 CR0327R1 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson | Noted - Revised |
R1‑143269 | 25.214 CR0720 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson | Noted - Revised |
R1‑143270 | Remaining Details for Improved Power Control after DTX Gap on Secondary Carrier | Ericsson | Noted |
R1‑143271 | Aspects to Consider by Moving the DL Control Channels from the Secondary Carrier to the Primary Carrier | Ericsson | Noted |
R1‑143272 | Specification Details on Removing the Post-Verification Period of the Synchronization Procedure A for the Secondary Uplink Frequency | Ericsson | Noted |
R1‑143273 | New SID: Study on Machine Type Communication for UMTS | Ericsson | Noted |
R1‑143274 | Email summary of [77-14] network coordination on UE UL transmit power | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143275 | Considerations for PUCCH on SCell for CA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143276 | On the Need for Name Change for UE Capability Parameters in Dual Connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑143277 | Discussion on physical structure of D2D data channel and PDU mapping | Intel Corporation | Noted |
R1‑143278 | Resource allocations for Type-1 D2D discovery | Sony | Not treated |
R1‑143279 | UE Capability for LTE Coverage Enhancements | China Telecom | Noted |
R1‑143280 | Enhanced L1 procedure for small cells on/off transition time reduction | China Telecom | Not treated |
R1‑143281 | Phase II calibration results for 3D channel model | China Telecom | Withdrawn |
R1‑143282 | Transmission power of discovery and communication | Samsung | Not treated |
R1‑143283 | Open issues regarding new L1 procedures for activated SCells operating on/off in Rel. 12 | Texas Instruments | Not treated |
R1‑143284 | Prioritization of UL Channels for Dual Connectivity | Texas Instruments | Not treated |
R1‑143285 | Further details of power allocation between cell groups | Texas Instruments | Not treated |
R1‑143286 | The small cell on/off state indication by DCI format | ITL Inc. | Not treated |
R1‑143287 | Details on signaling for T-RPT in SA | ITL Inc. | Not treated |
R1‑143288 | Discussion on D2D and WAN Coexistence in FDD carriers | ITL Inc. | Not treated |
R1‑143289 | Details on D2D synchronization signal design | ITL Inc. | Not treated |
R1‑143290 | Uplink Power Control for Dual Connectivity | KT Corp. | Not treated |
R1‑143291 | Remaining issue on UL simultaneous transmission for dual connectivity | KT Corp. | Not treated |
R1‑143292 | Reply LS on introducing the EVS codec in MTSI | Ericsson | Noted - Revised |
R1‑143293 | Inclusion of definition of WLAN Beacon RSSI in UMTS specifications | Ericsson | Not treated |
R1‑143294 | Inclusion of definition of WLAN metrics in 3GPP specifications | Ericsson | Not treated |
R1‑143295 | Inclusion of definition of WLAN Beacon RSSI in LTE specifications | Ericsson | Not treated |
R1‑143296 | Inclusion of definition of WLAN metrics in 3GPP specifications | Ericsson | Not treated |
R1‑143297 | Further Discussion on CSI enhancements for NAICS | Ericsson | Not treated |
R1‑143298 | NAICS Higher Layer Signaling: Parameters and Inter-Relationships | Ericsson | Noted |
R1‑143299 | Higher Layer Signaling of TM10 DMRS Properties for NAICS | Ericsson | Not treated |
R1‑143300 | Pa Range Extension of QPSK for NAICS Signaling | Ericsson | Not treated |
R1‑143301 | 4 CRS Port NAICS: Complexity, Performance, and Codebook Subset Restriction | Ericsson | Not treated |
R1‑143302 | Performance of Codebook Subset Restriction for 4 CRS Port NAICS | Ericsson | Not treated |
R1‑143303 | Initialization of TA values | Ericsson | Not treated |
R1‑143304 | Remaining issues of power headroom reporting for dual connectivity | Ericsson | Not treated |
R1‑143305 | “Look-ahead” aspects for dual connectivity | Ericsson | Not treated |
R1‑143306 | Priority handling for synchronous dual connectivity | Ericsson | Not treated |
R1‑143307 | Support of PUCCH on SCell | Ericsson | Not treated |
R1‑143308 | Simultaneous Rx/Tx support for dual connectivity | Ericsson | Not treated |
R1‑143309 | Remaining aspects on UE capabilities | Ericsson | Not treated |
R1‑143310 | Clarification of half-duplex FDD operation for low-complexity MTC UEs | Ericsson | Withdrawn |
R1‑143311 | Draft LS on half-duplex FDD operation for low-complexity MTC UEs | Ericsson | Revised |
R1‑143312 | Remaining issues on 256QAM table design | Ericsson | Not treated |
R1‑143313 | 256QAM configuration and RRC signaling | Ericsson | Not treated |
R1‑143314 | UE category solution for 256QAM support | Ericsson | Not treated |
R1‑143315 | 256 QAM for PMCH transmissions | Ericsson | Not treated |
R1‑143316 | Design of Small Cell On/Off for an Activated Scell | Ericsson | Not treated |
R1‑143317 | Remaining Details on Discovery Design | Ericsson | Not treated |
R1‑143318 | Network Assistance for DRS | Ericsson | Not treated |
R1‑143319 | RRM Procedures with DRS | Ericsson | Not treated |
R1‑143320 | RSSI Measurement for DRS | Ericsson | Not treated |
R1‑143321 | Cell or Transmission Point Identification Performance for CSI-RS and CRS based discovery signals | Ericsson | Not treated |
R1‑143322 | Correction to DL HARQ feedback table for TDD | Ericsson | Agreed in principle |
R1‑143323 | Calibration Results for 3D Channel Model | CHTTL | Not treated |
R1‑143324 | 25.214 CR0721 (Rel-11, F) Clarifications to Multiflow Operation | Qualcomm Incorporated | Agreed in principle |
R1‑143325 | Improved DCH reliability with SRB transmission | Qualcomm Incorporated | Noted |
R1‑143326 | Compressed mode operation without SF reduction in basic configuration | Qualcomm Incorporated | Noted |
R1‑143327 | Summary of email discussions on remaining issues of DCH enhancements | Qualcomm Incorporated | Noted |
R1‑143328 | Remaining issues of DCH enhancements WI | Qualcomm Incorporated | Noted |
R1‑143329 | 25.211 CR0316R1 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Revised |
R1‑143330 | 25.212 CR0329R2 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Revised |
R1‑143331 | 25.214 CR0715R1 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted - Revised |
R1‑143332 | 25.215 CR0201 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted - Revised |
R1‑143333 | Cubic Metric Analysis for Secondary Pilot | Qualcomm Incorporated | Noted |
R1‑143334 | Transmission Pattern of Secondary Pilot | Qualcomm Incorporated | Noted |
R1‑143335 | Power Control Aspects of Secondary Pilot | Qualcomm Incorporated | Noted |
R1‑143336 | E-DCH Decoupling and Out-of-Sync Operation | Qualcomm Incorporated, Nokia Networks | Noted |
R1‑143337 | Remaining aspects of TTI Switching | Qualcomm Incorporated | Noted |
R1‑143338 | E-TFC Selection Procedures for Lean Carrier Operation | Qualcomm Incorporated | Noted |
R1‑143339 | Optimization of Secondary Carrier Activation in DRX | Qualcomm Incorporated | Noted |
R1‑143340 | Evaluation on CSI enhancement of NAICS for LTE | CATR | Not treated |
R1‑143341 | Phase 2 calibration results for 3D channel modelling | CATR | Not treated |
R1‑143342 | Discussions on the leftover issues for 256QAM | CATR | Not treated |
R1‑143343 | Views on the small cell on/off time reduction | CATR | Not treated |
R1‑143344 | UE measurement based on discovery signal | ASUSTeK | Not treated |
R1‑143345 | Discussion of D2D mode 2 SA resource allocation | ASUSTeK | Not treated |
R1‑143346 | Discussion on the essentiality of frequency diversity for Type 2B discovery pattern evaluation | ASUSTeK | Revised |
R1‑143347 | A Hopping Pattern Design for Type 2B Discovery | ASUSTeK | Revised |
R1‑143348 | Draft CR for Clarification of special subframe and usage alignment | Motorola Mobility | Noted |
R1‑143349 | Draft CR for Introduction of Rel-12 LTE-Advanced features in 36.213 | Motorola Mobility | Noted - Revised |
R1‑143350 | Remaining aspects of 256-QAM | Motorola Mobility | Not treated |
R1‑143351 | Further discussion on procedures for small cell ON/OFF | Motorola Mobility | Noted |
R1‑143352 | Spatial Correlation Accuracy with WINNER II Large Scale Parameter Generation | Motorola Mobility | Noted |
R1‑143353 | 3D Spatial Channel Model Phase 2 Simulation Results | Motorola Mobility | Not treated |
R1‑143354 | Discussion on Mode 2 resource allocation | Potevio | Not treated |
R1‑143355 | Discussion on the L1 procedure for small cell on/off transition time reduction | Potevio | Not treated |
R1‑143356 | Considerations on DRS-based RSRQ/RSSI measurement | Potevio | Not treated |
R1‑143357 | Remaining issues on 256QAM support | KT Corp. | Not treated |
R1‑143358 | Results for 3D Channel Model Calibration Phase 2 | Orange | Not treated |
R1‑143359 | 36.213 CR0464 (Rel-12, F) Correction on SRS transmission for TDD-FDD CA | Samsung, Nokia Corporation, Nokia Networks | Agreed |
R1‑143360 | Extended E-HICH and common RGCH SLS results | Nokia Networks | Noted |
R1‑143361 | FEUL TDM scheduling enhancement aspects to RAN1 | Nokia Networks | Noted |
R1‑143362 | 36.214 CR0021r1 (Rel-12, C) New E-UTRA RSRQ measurement definition | Nokia Corporation, Nokia Networks, CATT, Panasonic, Fujitsu, Huawei, HiSilicon | Agreed |
R1‑143363 | 25.215 CR0200r1 (Rel-12, C) New E-UTRA RSRQ measurement definition | Nokia Networks, Nokia Corporation, CATT, Panasonic, Fujitsu, Huawei, HiSilicon | Agreed |
R1‑143364 | 25.225 CR0103r2 (Rel-12, C) New E-UTRA RSRQ measurement definition | CATT, Nokia Networks, Nokia Corporation, Panasonic, Fujitsu, Huawei, HiSilicon | Agreed |
R1‑143365 | On Timing and D2D Signals Multiplexing | Ericsson | Not treated |
R1‑143366 | D2D Physical Channels Design | Ericsson | Noted |
R1‑143367 | Frame Structure for D2D-Enabled LTE Carriers | Ericsson | Not treated |
R1‑143368 | Discovery Resource Allocation | Ericsson | Not treated |
R1‑143369 | Inter-Carrier Aspects of D2D Discovery and Communication | Ericsson | Noted |
R1‑143370 | Synchronization Signals Design for D2D | Ericsson | Not treated |
R1‑143371 | Synchronization Procedures for D2D | Ericsson | Not treated |
R1‑143372 | On SA procedure and SA contents | Ericsson | Not treated |
R1‑143373 | On resource grants for D2D communication | Ericsson | Not treated |
R1‑143374 | On power control for D2D communication | Ericsson | Withdrawn |
R1‑143375 | 25 214 CR0722 (Rel-11 F) Correction to the Four Branch MIMO | Huawei, HiSilicon | Noted - Revised |
R1‑143376 | 25.211 CR0318 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑143377 | 25.212 CR0330 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑143378 | 25.213 CR0118 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑143379 | 25.214 CR0723 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑143380 | Summary of the email discussion on remaining details of secondary pilot solution for Hetnet | Huawei, HiSilicon | Noted |
R1‑143381 | Remaining details of the secondary pilot solution | Huawei, HiSilicon | Noted |
R1‑143382 | Compatibility of the new features in HetNet | Huawei, HiSilicon | Noted |
R1‑143383 | 25.211 CR0319 (Rel-12, B) Transmitting the DL control channel related to the seondary carrier on the primary carrier | Huawei, HiSilicon | Noted |
R1‑143384 | 25.214 CR0724 (Rel-12, B) Transmitting the DL control channel related to the seondary carrier on the primary carrier | Huawei, HiSilicon | Noted |
R1‑143385 | 25.212 CR0331 (Rel-12, B) Introduction of RAN1 signaling for TTI indication | Huawei, HiSilicon | Noted |
R1‑143386 | 25.214 CR0725 (Rel-12, B) Introduction of RAN1 signaling for TTI indication | Huawei, HiSilicon | Noted |
R1‑143387 | Evaluation results for transmiting F-DPCH for the secondary carrier on the primary carrier | Huawei, HiSilicon | Noted |
R1‑143388 | Bandwidth reduction options in Rel-13 low-cost MTC | Huawei, HiSilicon | Not treated |
R1‑143389 | Corrections on UL-reference UL/DL configuration | CATT | Noted - Revised |
R1‑143390 | Draft CR for 36.211 on 256QAM and LC-MTC | Ericsson | Noted - Revised |
R1‑143391 | Reply LS on stage 2 related aspects of introducing the EVS codec in MTSI | SA4, Ericsson | Noted |
R1‑143392 | Draft LS on half-duplex FDD operation for low-complexity MTC UEs | Ericsson | Noted - Revised |
R1‑143393 | Clarification of PUSCH rate matching with SRS | LG Electronics | Noted |
R1‑143394 | Resource allocation for type 2B discovery | Samsung | Not treated |
R1‑143395 | L1 parameters for SCE-PHY on efficient operation | Huawei, HiSilicon | Revised |
R1‑143396 | Summary of email discussion [77-08]: Small cell on/off transition time reduction | Ericsson | Noted |
R1‑143397 | Summary of Email discussion [77-18] TA in SA for D2D | LG Electronics | Noted |
R1‑143398 | Summary of email discussion on NAICS higher-layer signaling | MediaTek Inc. | Noted |
R1‑143399 | Discussion on the essentiality of frequency diversity for Type 2B discovery pattern evaluation | ASUSTeK | Noted |
R1‑143400 | A Hopping Pattern Design for Type 2B Discovery | ASUSTeK | Not treated |
R1‑143401 | Remaining issues on resource allocation for Type 1 discovery | LG Electronics | Not treated |
R1‑143402 | Discussion on resource allocation for Type 2B discovery | LG Electronics | Not treated |
R1‑143403 | HARQ-ACK transmission shift for D2D and WAN co-existence | LG Electronics | Not treated |
R1‑143404 | Final Report of RAN1#77 meeting | MCC | Approved |
R1‑143405 | WF on 256QAM for PMCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Verizon, AT&T | Noted |
R1‑143406 | WF on D2DSS | LG Electronics, Qualcomm, General Dynamics UK, CATT, Intel | Noted |
R1‑143407 | 36.213 CR0465 (Rel-12, F) Correction on beta_{offset}^{HARQ-ACK} determination for a UE configured with two uplink power control subframe sets | LG Electronics | Agreed |
R1‑143408 | 36.213 CR0466 (Rel-12, F) Corrections for TDD eIMTA | CATT | Agreed |
R1‑143409 | WF on D2D DCI | Qualcomm Inc., General Dynamics, ETRI | Noted |
R1‑143410 | WF on D2DSS Multiplexing | Qualcomm Incorporated, General Dynamics, CATT, III, LGE | Withdrawn |
R1‑143411 | WF on D2DSS Relaying for Type 1 Discovery | Qualcomm Inc., General Dynamics, LGE, III | Noted |
R1‑143412 | WF on D2DSS Relaying for Type 2B Discovery | Qualcomm Inc., General Dynamics, III, LGE, DoCoMo, Kyocera | Noted |
R1‑143413 | WF on Data Hopping | Qualcomm Inc., ETRI, Kyocera | Noted |
R1‑143414 | WF on Type 1 and 2B Discovery Repetition | Qualcomm Inc., CATR, LGE | Noted |
R1‑143415 | WF on Discovery Resource Size | Qualcomm Inc., General Dynamics, CATR, III | Noted |
R1‑143416 | WF on Mode 1 Grant and SA | Qualcomm Inc., III, Kyocera | Noted |
R1‑143417 | WF on Mode 2 Transmission Timing | Qualcomm Inc., General Dynamics, III, Kyocera | Not treated |
R1‑143418 | WF on Multiple Transmission Pools | Qualcomm Inc., LGE, ETRI, III | Noted |
R1‑143419 | WF on PD2DSCH | Qualcomm Incorporated, General Dynamics, III | Not treated |
R1‑143420 | WF on Resource Pool Definition | Qualcomm Inc. (Rapporteur) | Noted |
R1‑143421 | WF on SA Content | Qualcomm Inc., ETRI, III, Samsung | Not treated |
R1‑143422 | WF on SA Transmission | Qualcomm Inc., General Dynamics, Samsung | Not treated |
R1‑143423 | WF on Synch. Period & Resource | Qualcomm Incorporated, CATR, ETRI | Not treated |
R1‑143424 | WF on TRPT | Qualcomm Incorporated | Withdrawn |
R1‑143425 | WF on Type 2B Transmission Timing | Qualcomm Inc., General Dynamics, III, LGE, Kyocera | Not treated |
R1‑143426 | WF on D2DSS | Qualcomm Incorporated | Withdrawn |
R1‑143427 | 36.213 CR0467 (Rel-12, F) CR on HARQ-ACK Multiplexing in PUSCH for TDD-FDD CA | Samsung | Noted - Revised |
R1‑143428 | 36.211 CR0192 (Rel-12, B) Inclusion of low-cost MTC and 256QAM | Ericsson | Agreed |
R1‑143429 | LS on half-duplex FDD operation for low-complexity MTC Ues | RAN1, Ericsson | Agreed |
R1‑143430 | WF on Selection and Reselection of Synchronization Source | Samsung, LGE, KDDI, ETRI | Not treated |
R1‑143431 | WF on Triggering Condition(s) of D2DSS Transmission | Samsung, Nokia Corp., Nokia Networks, KDDI, III, ETRI | Not treated |
R1‑143432 | [Draft] reply LS on eNB knowledge of low complexity UEs | Ericsson | Noted - Revised |
R1‑143433 | Summary of offline discussions on detailed design of discovery signal | Huawei, HiSilicon | Noted |
R1‑143434 | Proposed starting point of discussion on small cell discovery TP identification and assistance signaling | Huawei, HiSilicon | Noted |
R1‑143435 | WF on T-RPT | ZTE, Qualcomm | Noted |
R1‑143436 | WF on allocation of remaining power in dual connectivity | Ericsson, NTT DOCOMO | Not treated |
R1‑143437 | WF on PSCell mechanisms in dual connectivity | NTT DOCOMO, NEC, Hitachi, SoftBank Mobile | Noted |
R1‑143438 | WF on details of guaranteed power in dual connectivity | NTT DOCOMO, NEC, InterDigital, Hitachi, SoftBank Mobile | Noted |
R1‑143439 | WF on power coordination in dual connectivity | NTT DOCOMO, NEC, SoftBank Mobile | Noted |
R1‑143440 | WF on remaining PHR aspects for dual connectivity | NTT DOCOMO, Nokia Networks, Nokia Corporation | Noted - Revised |
R1‑143441 | WF on SCell PUCCH mechanisms in CA | NTT DOCOMO, NEC, Hitachi | Noted |
R1‑143442 | WF on T- RPT Patterns for SA and Data | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑143443 | WF on Priority rule for PUCCH/PUSCH | LG Electronics, Samsung, InterDigital, KT Corp, Intel | Noted - Revised |
R1‑143444 | WF on look-ahead behaviour in dual connectivity | Huawei, HiSilicon, CATT | Noted |
R1‑143445 | WF on Mode-2 Resource Allocation | Ericsson | Noted |
R1‑143446 | 1-bit resource reservation for mode 2 communication | Huawei, HiSilicon | Noted |
R1‑143447 | void | - | Withdrawn |
R1‑143448 | WF on T-RPT design in D2D | Panasonic, Intel | Noted |
R1‑143449 | WF on Pools Configuration | Ericsson, Qualcomm | Noted - Revised |
R1‑143450 | WF on T-RPT Design | Samsung, Ericsson, Qualcomm | Noted |
R1‑143451 | WF on Pools Configuration | Ericsson, Qualcomm | Noted - Revised |
R1‑143452 | void | - | Withdrawn |
R1‑143453 | Way Forward on TPC and Power Control for D2D | Ericsson, Panasonic | Noted - Revised |
R1‑143454 | WF on D2D Power Control | Huawei, HiSilicon, U.S. DoC, GDB, Qualcomm | Noted |
R1‑143455 | WF on Pools Configuration | Ericsson, Qualcomm | Noted |
R1‑143456 | WF on T-RPT Design | Samsung | Noted |
R1‑143457 | WF on Hopping Pattern for Type 2B Discovery | ZTE, DoCoMo, Qualcomm Inc. | Noted |
R1‑143458 | Type 2B Discovery Hopping: Offline Session | Qualcomm Inc., Huawei, HiSilicon, DoCoMo, ZTE, LGE, General Dynamics, Intel, Ericsson | Noted |
R1‑143459 | LS on RRC parameters for ProSe LTE D2D | RAN1, Qualcomm | Agreed |
R1‑143460 | Way Forward on TPC and Power Control for D2D | Ericsson, Panasonic, Deutsche Telekom AG, Orange | Noted |
R1‑143461 | 36.214 CR0022R2 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in LTE specifications | Ericsson | Agreed |
R1‑143462 | 25.215 CR0202R2 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in UMTS specifications | Ericsson | Agreed |
R1‑143463 | 25.225 CR0104 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in UMTS specifications | Ericsson | Agreed |
R1‑143464 | SA Hopping | Qualcomm Inc. | Noted |
R1‑143465 | WF on the remaining TBS table design for 256QAM | CMCC, Huawei, Hisilicon, CHTTL, ZTE, CATT, CATR, MediaTek, CATR, Potevio, III, Coolpad | Noted |
R1‑143466 | WF on “look ahead” aspect in dual connectivity | Ericsson, NTT DOCOMO | Not treated |
R1‑143467 | Way Forward on 256QAM Design | Huawei, HiSilicon, CMCC, Samsung, CATT, CATR | Noted |
R1‑143468 | Way Forward on capturing calibration results for 3D-channel model | Nokia Networks, Nokia Corporation | Noted |
R1‑143469 | Summary of 3D-channel model calibration results | Nokia Networks, Nokia Corporation | Noted |
R1‑143470 | TP on capturing calibration results into TR36.873 | Nokia Networks, Nokia Corporation | Agreed |
R1‑143471 | WF on hopping pattern for Type 2B discovery | ZTE | Withdrawn |
R1‑143472 | WF on Further details on RRM based on DRS | LG Electronics, NTT DOCOMO, ZTE | Noted |
R1‑143473 | WF on DRS-based RSRQ measurement | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NVIDIA, Intel, CATT | Noted |
R1‑143474 | Draft LS response on further clarifications on small cell on/off and discovery signal | Huawei, HiSilicon | Noted - Revised |
R1‑143475 | WF on Scrambling and DMRS | LG Electronics, Qualcomm Incorporated, Samsung | Noted |
R1‑143476 | [Draft] LS on 256QAM | Huawei | Noted - Revised |
R1‑143477 | LS on RAN1 agreements for UMTS Heterogeneous Networks Enhancements | RAN1, Huawei | Agreed |
R1‑143478 | 25.214 CR0721R1 (Rel-11, F) Clarifications to Multiflow Operation | Qualcomm Incorporated | Noted - Revised |
R1‑143479 | 25.214 CR0723R1 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon, Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143480 | 25.214 CR0721R2 (Rel-11, F) Clarifications to Multiflow Operation | Qualcomm Incorporated | Agreed |
R1‑143481 | LS on RAN1 agreements on Further EUL Enhancements | RAN1, Qualcomm | Agreed |
R1‑143482 | LS on RAN1 agreements for DCH Enhancements | RAN1, Qualcomm | Agreed |
R1‑143483 | LS on RAN1 agreements for UMTS Heterogeneous Networks Enhancements | RAN1, Huawei | Agreed |
R1‑143484 | 25.211 CR0316R3 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated, MediaTek, Nokia Networks, Huawei, HiSilicon | Agreed |
R1‑143485 | 25.212 CR0329R4 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated, MediaTek, Nokia Networks, Huawei, HiSilicon | Agreed |
R1‑143486 | 25.214 CR0715R2 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated, MediaTek, Nokia Networks, Huawei, HiSilicon | Agreed |
R1‑143487 | 25.211 CR0315R2 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143488 | 25.212 CR0328R2 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143489 | 25.213 CR0117R2 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143490 | 25 214 CR0722R1 (Rel-11 F) Correction to the Four Branch MIMO | Huawei, Ericsson | Agreed |
R1‑143491 | 25.212 CR0327R2 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson, Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143492 | 25.214 CR0720R1 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson, Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | Noted - Revised |
R1‑143493 | 25.214 CR0720R2 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson, Huawei, HiSilicon, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143494 | 25.211 CR0318R1 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon, Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143495 | 25.212 CR0330R1 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon, Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143496 | 25.213 CR0118R1 (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon, Ericsson, Nokia Networks, Qualcomm Incorporated | Agreed |
R1‑143497 | LS on further clarifications on small cell on/off and discovery signal | RAN4, Ericsson | Noted |
R1‑143498 | Draft LS response on further clarifications on small cell on/off and discovery signal | Huawei, HiSilicon | Noted - Revised |
R1‑143499 | Remaining aspects for small cell discovery signal design | Huawei, HiSilicon | Noted |
R1‑143500 | WF on UE capability for dual connectivity | LG Electronics, Ericsson, NTT DOCOMO | Revised |
R1‑143501 | LS on WLAN/3GPP Radio Interworking WLAN metrics | RAN2, Intel | Noted |
R1‑143502 | Support of fallback operation for NAICS | CATT | Not treated |
R1‑143503 | WF on TDD higher-layer signaling for NAICS | CATT, CMCC, Huawei, HiSilicon, Samsung, Softbank, ZTE | Noted - Revised |
R1‑143504 | WF on cell specific hopping pattern for Type 2B discovery | LG Electronics, Intel, Docomo, Kyocera, ASUSTeK, KDDI | Noted |
R1‑143505 | LS response on further clarifications on small cell on/off and discovery signal | RAN1, Huawei | Agreed |
R1‑143506 | Details on scrambling sequence generation | Samsung | Not treated |
R1‑143507 | Proposal on the range and resolution of guaranteed power | NTT DOCOMO | Noted |
R1‑143508 | [Draft] LS on updated LTE Rel-12 UE features list | NTT DOCOMO | Noted - Revised |
R1‑143509 | LS on updated LTE Rel-12 UE features list | RAN1, NTT DOCOMO | Agreed |
R1‑143510 | WF on remaining PHR aspects for dual connectivity | NTT DOCOMO, Nokia Networks, Nokia Corporation | Noted |
R1‑143511 | 36.214 CR0022 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in LTE specifications | Ericsson | Revised |
R1‑143512 | 25.215 CR0202 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in UMTS specifications | Ericsson | Revised |
R1‑143513 | Proposals on Priority rule for PUCCH/PUSCH | LG Electronics, InterDigital, Samsung | Noted |
R1‑143514 | Proposals on clarification on synchronous and asynchronous scenarios | LG Electronics, InterDigital | Noted - Revised |
R1‑143515 | WF on NAICS higher-layer signaling at least for TM1 to TM9 | MediaTek, Acer, ASUSTek, CHTTL, HTC, III, ITRI, NTT DoCoMo, Intel, CMCC, NVIDIA, Qualcomm, Verizon, Orange | Noted |
R1‑143516 | WF on NAICS higher-layer signaling for TM10 | MediaTek, Acer, ASUSTek, CHTTL, HTC, III, ITRI, NTT DoCoMo, LGE, Qualcomm, Samsung | Noted |
R1‑143517 | WF on “look-ahead” aspect in asynchronous dual connectivity | Ericsson, NTT DoCoMo, Softbank, Nokia Networks, Nokia Corporation, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑143518 | WF on Pcmax in PHR of Dual connectivity | Ericsson, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, InterDigital | Noted |
R1‑143519 | WF on D2D in Multiple Carriers | LG Electronics | Noted |
R1‑143520 | LS on NAICS Parameters | RAN4, MediaTek | Noted |
R1‑143521 | WF on introducing DCI format 3/3A | LG Electronics, CATT, Sharp | Noted |
R1‑143522 | WF on CSI enhancement for NAICS | NTT DOCOMO, ALU, ASB, Huawei, HiSi, LG, MediaTek, Qualcomm, Samsung, Verizon, ZTE | Noted |
R1‑143523 | 36.213 CR0467 (Rel-12, F) CR for Clarification of special subframe and usage alignment | Motorola Mobility, Fujitsu | Noted - Revised |
R1‑143524 | WF on RA in D2D grant | LG Electronics, Qualcomm Inc., Intel, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑143525 | WF on 256QAM UE category handling | Ericsson, Samsung, NTT DOCOMO, Nokia, NSN, ZTE, CMCC, CATT, CATR, III, Coolpad, Potevio, AT&T, KDDI | Noted |
R1‑143526 | WF on multiplexing UL HARQ-ACK TX and D2D TX/RX | LG Electronics, Huawei, HiSilicon, NEC | Not treated |
R1‑143527 | WF on handling overlap between D2D TX symbol and cell-specific SRS symbol | LG Electronics, Qualcomm | Not treated |
R1‑143528 | Way-forward on NAICS fallback | CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Nokia Corporation, Nokia Networks | Noted |
R1‑143529 | WF on resource grouping | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LGE | Not treated |
R1‑143530 | [Draft] LS for Rel-12 NAICS | MediaTek | Noted - Revised |
R1‑143531 | [Draft] LS for Rel-12 NAICS | MediaTek | Noted - Revised |
R1‑143532 | WF on resource allocation for D2DSS | LG Electronics, Qualcomm | Not treated |
R1‑143533 | [Draft] LS on L1 parameters for 256QAM | Huawei | Noted - Revised |
R1‑143534 | WF on TDD higher-layer signaling for NAICS | CATT, CMCC, Qualcomm, Huawei, HiSilicon, NVIDIA, Samsung, LGE, Softbank | Noted |
R1‑143535 | LS for Rel-12 NAICS | RAN1, MediaTek | Agreed |
R1‑143536 | T-RPT pattern design | Nokia Networks, Nokia Corporation | Noted - Revised |
R1‑143537 | WF on Interference Control for Type 1 Discovery | Intel, LGE, Huawei, HiSilicon, Nokia Corporation, Nokia Networks, Fujitsu, ETRI | Noted |
R1‑143538 | Way forward on small cell discovery signal design | Huawei, HiSilicon, Ericsson | Noted |
R1‑143539 | Way forward on small cell discovery RSSI | Huawei, HiSilicon | Noted |
R1‑143540 | WF on small cell on/off transition time reduction on an activated Scells | Ericsson, Panasonic, Intel, NTT DOCOMO | Noted |
R1‑143541 | LS on 256QAM | RAN1, Huawei | Agreed |
R1‑143542 | LS on L1 parameters for 256QAM | RAN1, Huawei | Agreed |
R1‑143543 | Clarification of LSP correlation in TR36.873 | Motorola Mobility | Withdrawn |
R1‑143544 | WF on synchronization assistance information | NTT DOCOMO, Samsung, ETRI, ZTE | Noted |
R1‑143545 | 36.214 CR0022R1 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in LTE specifications | Ericsson | Noted - Revised |
R1‑143546 | 25.215 CR0202R1 (Rel-12, B) Inclusion of definition of WLAN Beacon RSSI in UMTS specifications | Ericsson | Noted - Revised |
R1‑143547 | WF on UE capability for dual connectivity | LG Electronics, Ericsson, Huawei, HiSilicon | Noted |
R1‑143548 | Summary of offline discussion for remaining TBS issue | CMCC | Noted |
R1‑143549 | Draft LS on the structure of the discovery reference signal for small cell discovery | Huawei | Noted - Revised |
R1‑143550 | Draft LS on the size of the neighbour TP list for small cell discovery | Huawei | Noted - Revised |
R1‑143551 | LS on the structure of the discovery reference signal for small cell discovery | RAN1, Huawei | Agreed |
R1‑143552 | LS on the size of the neighbour TP list for small cell discovery | RAN1, Huawei | Agreed |
R1‑143553 | Discussion on calibration and baseline results | ZTE | Noted |
R1‑143554 | WF on the range and resolution of guaranteed power | NTT DOCOMO, NEC | Noted |
R1‑143555 | WF on handling PRACH in dual connectivity | NEC | Noted |
R1‑143556 | WF on Priority rule for PUCCH/PUSCH | LG Electronics, Samsung, InterDigital, Intel, NEC, CATT, Panasonic, Texas Instruments | Noted |
R1‑143557 | WF on NAICS | CATT, AT&T, ALU, ASB, Ericsson, Nokia Corporation, Nokia Networks | Noted |
R1‑143558 | [Draft] LS on range and resolution of P_MeNB and P_SeNB in dual connectivity | NEC | Noted - Revised |
R1‑143559 | 25.211 CR0316R2 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted - Revised |
R1‑143560 | 25.212 CR0329R3 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted - Revised |
R1‑143561 | WF on D2DSS location | LG Electronics, Qualcomm, General Dynamics, Fujitsu, Samsung, CATT, ETRI | Not treated |
R1‑143562 | WF on synchronization procedure | LG Electronics, Qualcomm, NEC, General Dynamics, ETRI | Not treated |
R1‑143563 | LS on range and resolution of P_MeNB and P_SeNB in dual connectivity | RAN1, NEC | Revised |
R1‑143564 | Summary of Offline Discussion on Synchronization | Ericsson | Noted |
R1‑143565 | WF On T-RPT Patterns for SA | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑143566 | void | - | Withdrawn |
R1‑143567 | Offline discussion on clarification on synchronous and asynchronous scenarios | LG Electronics | Noted |
R1‑143568 | TP on capturing calibration results into TR36.873 | Nokia Networks, Nokia Corporation | Noted - Revised |
R1‑143569 | Proposal on Subframe Level Small Cell ON/OFF | Huawei, HiSilicon | Noted |
R1‑143570 | Agreement on Pools Configuration | Ericsson, Qualcomm | Agreed |
R1‑143571 | WF on D2D Initial Synchronization | Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑143572 | void | - | Withdrawn |
R1‑143573 | void | - | Withdrawn |
R1‑143574 | void | - | Withdrawn |
R1‑143575 | void | - | Withdrawn |
R1‑143576 | void | - | Withdrawn |
R1‑143577 | void | - | Withdrawn |
R1‑143578 | void | - | Withdrawn |
R1‑143579 | void | - | Withdrawn |
R1‑143580 | void | - | Withdrawn |
R1‑143581 | void | - | Withdrawn |
R1‑143582 | void | - | Withdrawn |
R1‑143583 | void | - | Withdrawn |
R1‑143584 | void | - | Withdrawn |
R1‑143585 | void | - | Withdrawn |
R1‑143586 | void | - | Withdrawn |
R1‑143587 | void | - | Withdrawn |
R1‑143588 | void | - | Withdrawn |
R1‑143589 | void | - | Withdrawn |
R1‑143590 | Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services | Ad-Hoc Chairman (Alcatel Lucent) | Endorsed |
R1‑143591 | Summary of Ad-hoc session on WLAN/3GPP Radio Interworking | Ad-Hoc Chairman (Qualcomm) | Endorsed |
R1‑143592 | Summary of Ad-hoc session on Study on 3D-channel model for Elevation Beamforming and FD-MIMO | Ad-Hoc Chairman (Qualcomm) | Endorsed |
R1‑143593 | WF on DRS measurement for TDD | CATT, CMCC, CATR, Nokia Networks, Nokia Corporation, Huawei, HiSilicon | Noted - Revised |
R1‑143594 | Proposal on T-RPT design | ZTE | Not treated |
R1‑143595 | WF on Conflict Resolution of D2D Frame Number | Samsung, III | Not treated |
R1‑143596 | T-RPT pattern design | Nokia Networks, Nokia Corporation | Noted |
R1‑143597 | LS on range and resolution of P_MeNB and P_SeNB in dual connectivity | RAN1, NEC | Agreed |
R1‑143598 | WF on UE processing capability | CMCC, CATT | Noted - Revised |
R1‑143599 | Clarification of PUSCH rate matching with SRS | LG Electronics | Noted |
R1‑143600 | 36.211 Draft CR (Rel-11, F) for clarification of PUSCH rate matching with SRS | LGE | Withdrawn |
R1‑143601 | 36.211 Draft CR (Rel-12, A) for clarification of PUSCH rate matching with SRS | LGE | Not treated |
R1‑143602 | 36.212 Draft CR (Rel-11, F) for clarification of PUSCH rate matching with SRS | LGE | Withdrawn |
R1‑143603 | 36.212 Draft CR (Rel-12, A) for clarification of PUSCH rate matching with SRS | LGE | Not treated |
R1‑143604 | 36.213 Draft CR (Rel-11, F) for clarification of PUSCH rate matching with SRS | LGE | Withdrawn |
R1‑143605 | 36.213 Draft CR (Rel-12, A) for clarification of PUSCH rate matching with SRS | LGE | Not treated |
R1‑143606 | 36.212 Draft CR (Rel-12, F) for clarification of DCI fields in TDD-FDD CA operation alt2 | LG Electronics | Not treated |
R1‑143607 | 36.212 Draft CR (Rel-12, F) for clarification of DCI fields in TDD-FDD CA operation alt3 | LG Electronics | Noted |
R1‑143608 | Response LS on discovery message size | RAN2, Qualcomm | Noted |
R1‑143609 | [DRAFT] LS on agreements on small cell discovery | Huawei | Noted - Revised |
R1‑143610 | LS on agreements on small cell discovery | RAN1, Huawei | Agreed |
R1‑143611 | [Draft] LS on 256QAM for PMCH | Huawei | Noted - Revised |
R1‑143612 | LS on 256QAM for PMCH | RAN1, Huawei | Agreed |
R1‑143613 | 25.215 CR0201R1 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated, MediaTek, Nokia Networks, Huawei, HiSilicon | Agreed |
R1‑143614 | Chairpersons’ summary of the UMTS sessions | UMTS Session Chairpersons (Nokia Networks, Huawei) | Endorsed |
R1‑143615 | void | - | Withdrawn |
R1‑143616 | void | - | Withdrawn |
R1‑143617 | void | - | Withdrawn |
R1‑143618 | void | - | Withdrawn |
R1‑143619 | void | - | Withdrawn |
R1‑143620 | 36.213 CR0471 (Rel-12, F) CR for Clarification of special subframe and usage alignment | Motorola Mobility, Fujitsu | Agreed |
R1‑143621 | 36.213 CR0472 (Rel-12, B) Inclusion of low-cost MTC and 256QAM | Motorola Mobility | Agreed |
R1‑143622 | void | - | Withdrawn |
R1‑143623 | Summary of 3D-channel model calibration results | Nokia Networks, Nokia Corporation | Not treated |
R1‑143624 | [Draft] LS on 256QAM UE category | Huawei | Noted - Revised |
R1‑143625 | Corrections on UL-reference UL/DL configuration | CATT | Noted - Revised |
R1‑143626 | Corrections on UL-reference UL/DL configuration | CATT | Noted - Revised |
R1‑143627 | DRAFT CR to 36.213 (Rel-12, F) Correction to UCI embedding in case of a single serving cell and simultaneous PUSCH and PUCCH transmission | Samsung | Noted - Revised |
R1‑143628 | Draft CR on DMRS sequence generation when TM7 is overlapped with EPDCCH (Rel11) | Samsung | Noted - Revised |
R1‑143629 | Draft CR on DMRS sequence generation when TM7 is overlapped with EPDCCH (Rel12) | Samsung | Noted - Revised |
R1‑143630 | Draft CR for 36.212 on 256QAM and LC-MTC | Huawei | Noted - Revised |
R1‑143631 | Reply LS on introducing the EVS codec in MTSI | Ericsson | Noted - Revised |
R1‑143632 | WF on DRS measurement for TDD | CATT, CATR | Noted |
R1‑143633 | WF on MTA like operation when UE applies priority rule for PUCCH/PUSCH acrosss CGS | Intel, Panasonic, NTT DoCoMo, LG Electronics, Ericsson, Huawei, HiSilicon, Qualcomm, CATT, InterDigital, NEC, Texas Instruments | Noted |
R1‑143634 | Summary of offline discussion on R1-142942 | Qualcomm Incorporated | Noted |
R1‑143635 | Reply LS on eNB knowledge of low complexity UEs | RAN1, Ericsson | Agreed |
R1‑143636 | Reply LS on introducing the EVS codec in MTSI | RAN1, Ericsson | Agreed |
R1‑143637 | 36.213 CR0468 (Rel-11, F) Corrections on UL-reference UL/DL configuration | CATT, Samsung, Intel | Agreed |
R1‑143638 | Offline discussion on reporting Pcmax in PHR of Dual connectivity | Ericsson, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, InterDigital | Noted |
R1‑143639 | Way forward on the maximum duration of the DRS occasion | Huawei, HiSilicon, NVIDIA, Nokia Corporation, Nokia Networks, Intel, Fujitsu, Samsung, ZTE, NTT DOCOMO, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Sharp | Agreed |
R1‑143640 | Draft LS on L1 parameters for SCE-PHY on efficient operation | Huawei, HiSilicon | Noted - Revised |
R1‑143641 | L1 parameters for SCE-PHY on efficient operation | Huawei, HiSilicon | Noted - Revised |
R1‑143642 | [DRAFT] LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity | NTT DOCOMO | Noted - Revised |
R1‑143643 | 36.213 CR0469 (Rel-12, F) Correction to UCI embedding in case of a single serving cell and simultaneous PUSCH and PUCCH transmission | Samsung | Agreed |
R1‑143644 | Summary of offline discussion on R1-143164 | LG Electronics | Noted |
R1‑143645 | 36.211 CR0193 (Rel-11, F) CR on port 5 UE-specific reference signal when PDSCH is overlapped with EPDCCH | Samsung | Agreed |
R1‑143646 | 36.211 CR0194 (Rel-12, A) CR on port 5 UE-specific reference signal when PDSCH is overlapped with EPDCCH | Samsung | Agreed |
R1‑143647 | 36.213 CR0467R1 (Rel-12, F) Clarification of special subframe and usage alignment | Motorola Mobility, Fujitsu | Noted - Revised |
R1‑143648 | 36.213 CR0470 (Rel-12, A) Corrections on UL-reference UL/DL configuration | CATT, Samsung | Agreed |
R1‑143649 | WF on D2D resource pool bitmap length and repetition number for TDD | CATT, Ericsson, Qualcomm | Noted |
R1‑143650 | 36.213 CR0467R1 (Rel-12, F) CR on HARQ-ACK Multiplexing in PUSCH for TDD-FDD CA | Samsung | Revised |
R1‑143651 | WF on UE processing capability | CMCC, CHTTL, CATT, Potevio | Noted |
R1‑143652 | 36.212 CR0161 (Rel-12, B) CR for 36.212 on 256QAM and LC-MTC | Huawei | Agreed |
R1‑143653 | [Draft] LS on 256QAM UE category | Huawei | Noted - Revised |
R1‑143654 | 36.213 CR0467R2 (Rel-12, F) CR on HARQ-ACK Multiplexing in PUSCH for TDD-FDD CA | Samsung | Noted - Revised |
R1‑143655 | WF on extending PA range in NAICS | Nokia Networks, Nokia Corporation, ZTE, Huawei, HiSilicon, Alcatel Lucent, Alcatel-Lucent Shanghai Bell, Samsung, CMCC, CATT, NVIDIA, Vodafone | Noted |
R1‑143656 | SA resource definition and transmit patern design | Nokia Networks, Nokia Corporation | Noted |
R1‑143657 | [DRAFT] LS on RRC parameters needed for Rel-12 Physical layer functionalities required for operation of Dual Connectivity | NTT DOCOMO | Noted - Revised |
R1‑143658 | RRC parameters needed for Rel-12 Physical layer functionalities required for operation of Dual Connectivity | NTT DOCOMO | Noted - Revised |
R1‑143659 | Outcome of offline discussionson LTE Rel-12 UE capabilities | NTT DOCOMO | Noted |
R1‑143660 | Summary of offline email discussion on PRACH handling in dual connectivity | NEC | Noted |
R1‑143661 | Remaining open issues list for Rel-12 dual connectivity | NTT DOCOMO | Not treated |
R1‑143662 | 36.213 CR0467R3 (Rel-12, F) CR on HARQ-ACK Multiplexing in PUSCH for TDD-FDD CA | Samsung | Agreed |
R1‑143663 | TR36.873 v2.1.0 on Study on 3D channel model for LTE (Release 12) | Nokia Networks, Nokia Corporation | Agreed |
R1‑143664 | L1 parameters for SCE-PHY on efficient operation | Huawei, HiSilicon | Agreed |
R1‑143665 | LS on L1 parameters for SCE-PHY on efficient operation | RAN1, Huawei | Agreed |
R1‑143666 | [Draft] LS on RRC parameters needed for Rel-12 NAICS | MediaTek | Noted - Revised |
R1‑143667 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity | NTT DOCOMO | Agreed |
R1‑143668 | Reply LS on RAN4 RF check of PA Values for NAICS | RAN4, MediaTek | Noted |
R1‑143669 | [Draft] LS on RRC parameters needed for Rel-12 NAICS | MediaTek | Revised |
R1‑143670 | RRC parameters needed for Rel-12 Physical layer functionalities required for operation of Dual Connectivity | NTT DOCOMO | Agreed |
R1‑143671 | [Draft] LS on RRC parameters needed for Rel-12 NAICS | MediaTek | Noted - Revised |
R1‑143672 | [Draft] LS on 256QAM UE category | Huawei | Noted - Revised |
R1‑143673 | LS on RRC parameters needed for Rel-12 Physical layer functionalities required for operation of Dual Connectivity | RAN1, NTT DOCOMO | Agreed |
R1‑143674 | LS on RRC parameters needed for Rel-12 NAICS | RAN1, MediaTek | Agreed |
R1‑143675 | LS on 256QAM UE category | RAN1, Huawei | Agreed |
R1‑143676 | LS on ProSe provisioning parameters | RAN1, Qualcomm Inc. | Agreed |
R1‑143677 | void | - | Withdrawn |
R1‑143678 | void | - | Withdrawn |
R1‑143679 | void | - | Withdrawn |
page generated from database: 2024-07-20 12:15:34