3GPP TDocs (written contributions) at meeting
Meeting: R1-52b - 2008-03-31 to 2008-04-04, Shenzhen
meeting id: R1-52b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑081165 | Draft Agenda for RAN1#52bis meeting | RAN1 Chairman | Approved |
R1‑081166 | Draft report of RAN1#52 meeting | MCC Support | Revised |
R1‑081167 | Reply LS on CSG related mobility (stage 2 text) | GERAN, Nokia Siemens Networks | Noted |
R1‑081168 | Reply LS on code rate limitations for HS-DSCH UE cat 13 and 15 | RAN2, Ericsson | Noted |
R1‑081169 | Response LS to RAN5 on HSPA RB and SRB configurations in 34.108 | RAN2, Ericsson | Noted |
R1‑081170 | LS on new MCCH radio bearer configuration in 34.108 | RAN2, Ericsson | Noted |
R1‑081171 | Reply LS on radio problem detection as part of radio link failure handling | RAN2, Ericsson | Noted |
R1‑081172 | LS on the change rate of physical layer parameters | RAN2, Ericsson | Noted |
R1‑081173 | LS on various aspects related to GERAN to E-UTRAN interworking | RAN2, Motorola | Noted |
R1‑081174 | LS on PRB usage measurements in reply to R1-080617 | RAN2, NTT DoCoMo | Noted |
R1‑081175 | Reply LS on Signalling of additional spectrum emission requirements | RAN3, Motorola | Noted |
R1‑081176 | LS on RAN performance monitoring | RAN3, NTT DoCoMo | Noted |
R1‑081177 | LS on Self Configuring and Self Optimizing Network Use Cases and Solutions TR | RAN3, T-Mobile | Noted |
R1‑081178 | LS on UTRAN enhancements for the support of inter-cell interference cancellation | RAN3, Qualcomm | Noted |
R1‑081179 | LS on implications of MIMO precoding schemes on RAN4 requirements | RAN4, Nokia | Noted |
R1‑081180 | LS on Scale of Reported Measurement Quantities | RAN4, Ericsson | Noted |
R1‑081181 | Response to LS on switch time requirements for LTE TDD | RAN4, Ericsson | Noted |
R1‑081182 | LS on signalling Intra/Inter-frequency measurement bandwidth | RAN4, NTT DoCoMo | Noted |
R1‑081183 | LS reply on RAN Performance monitoring | SA5, Nokia Siemens Networks | Noted |
R1‑081184 | Mapping detail for the distributed allocation | Mitsubishi Electric | Not treated |
R1‑081185 | Performance of PMI Compression Schemes for E-UTRA: Results for Rank-1 Precoding | Icera Semiconductor | Not treated |
R1‑081186 | Performance of PMI Compression Schemes for E-UTRA: Results for Rank-2 Precoding | Icera Semiconductor | Not treated |
R1‑081187 | Dedicated RS Design for Extended CP | Nortel | Noted |
R1‑081188 | Impact of Common Reference Signal Density in BF zone | Nortel | Noted |
R1‑081189 | UL RS issue for supporting UL SDMA | Nortel | Withdrawn |
R1‑081190 | MCS Table Design for eNB | Nortel | Not treated |
R1‑081191 | Power Balancing for 4 Tx Antennas | Nortel | Not treated |
R1‑081192 | Further discussion on DL/UL signaling channel supporting rank adaptation for high mobility UE | Nortel | Not treated |
R1‑081193 | Differential PMI feedback | Nortel | Not treated |
R1‑081194 | Need of procedure for supporting MU-MIMO | Nortel | Not treated |
R1‑081195 | PDCCH transport block signaling | Panasonic | Noted - Revised |
R1‑081196 | PDCCH transport block signalling | Panasonic | Not treated |
R1‑081197 | Gap and index interleaver design for DVRB mapping | Panasonic | Not treated |
R1‑081198 | Necessity of the scrambling for ACK/NACK on PUCCH | Panasonic | Not treated |
R1‑081199 | Necessity of the scrambling for the reference signal of CQI in PUCCH | Panasonic | Not treated |
R1‑081200 | ACK/NACK repetition and Implicit Resource Allocation for PUCCH - Resubmission of R1-080981 | Panasonic | Not treated |
R1‑081201 | Sounding RS parameters | Panasonic | Not treated |
R1‑081202 | Effect of set S on CQI reports | Panasonic | Not treated |
R1‑081203 | RI reporting scheme on periodic wideband PUCCH | Panasonic | Not treated |
R1‑081204 | Control signalling for downlink MU-MIMO | Panasonic | Re-submission of R1-080990 |
R1‑081205 | Miscellaneous items on RACH | Panasonic | Noted |
R1‑081206 | BCCH on DL-SCH | Panasonic | Noted |
R1‑081207 | UE soft buffer | Panasonic | Agreed |
R1‑081208 | Summary of Reflector Discussions on EUTRA DL RS | Samsung | Noted |
R1‑081209 | Summary of Reflector Discussions on EUTRA UL RS | Samsung | Noted |
R1‑081210 | SRS transmission in UpPTS | Samsung | Not treated |
R1‑081211 | SRS indication for TDD | Samsung | Not treated |
R1‑081212 | UE-specific search spaces | Samsung | Noted |
R1‑081213 | MCS/TBS indication for DL-SCH and UL-SCH | Samsung | Not treated |
R1‑081214 | TBS table design for DL-SCH and UL-SCH | Samsung | Not treated |
R1‑081215 | DL PHICH Remapping with UL RB Size | Samsung | Not treated |
R1‑081216 | DCI Payload Formats and Contents | Samsung | Not treated |
R1‑081217 | Compact UL-SCH Assignment in E-UTRA | Samsung | Not treated |
R1‑081218 | Results for the linkage between PUSCH MCS and ACK/NACK resource amount on PUSCH | Samsung | Noted |
R1‑081219 | CCE to uplink ACK/NACK mapping in TDD | Samsung | Noted |
R1‑081220 | Multiplexing of Rank and CQI/PMI in PUSCH channel | Samsung | Revised |
R1‑081221 | ACK/NAK DTX Detection in the PUSCH | Samsung | Not treated |
R1‑081222 | ACK/NAK Repetitions in E-UTRA UL | Samsung | Not treated |
R1‑081223 | Multiplexing Control and Data in the PUSCH | Samsung | Not treated |
R1‑081224 | Increasing PUCCH Multiplexing Capacity | Samsung | Not treated |
R1‑081225 | Remaining details on uplink PUSCH hopping | Samsung | Revised |
R1‑081226 | Correction to UE PUSCH Hopping procedure | Samsung | Revised |
R1‑081227 | DVRB to PRB mapping in DwPTS | Samsung | Not treated |
R1‑081228 | PDSCH-to-RE mapping robust against CCFI reception errors | Samsung | Not treated |
R1‑081229 | On Gold sequence initialization | Samsung | Noted |
R1‑081230 | Further discussion on data power setting for PDSCH | Samsung | Not treated |
R1‑081231 | Power Scaling and DL RS boosting | Samsung | Not treated |
R1‑081232 | RE puncturing pattern for RS boosting | Samsung | Not treated |
R1‑081233 | Transmission Power Control Using DM RS for UL VoIP | Samsung | Noted |
R1‑081234 | Summary of email discussion on CQI reporting | Samsung | Noted |
R1‑081235 | SU-MIMO PMI feedback and Compression | Samsung | Not treated |
R1‑081236 | CQI Reporting for MU-MIMO | Samsung | Not treated |
R1‑081237 | Relation of Rank report and PUCCH CQI/PMI reports | Samsung | Not treated |
R1‑081238 | Timing for Enhanced Uplink in Cell_FACH | Samsung | Missing |
R1‑081239 | UE procedure after receiving NACK indication | Samsung | Noted |
R1‑081240 | Discussion on HS-PDSCH serving cell change procedure | Samsung | Noted |
R1‑081241 | Considerations on dual-cell HSDPA operation | Samsung | Noted |
R1‑081242 | On overload indicator triggering and reporting format | SHARP | Not treated |
R1‑081243 | VoIP Capacity Improvement by CQI Optimization in PUCCH | SHARP | Not treated |
R1‑081244 | PMI Synchronization Issues | SHARP | Not treated |
R1‑081245 | Further clarification fot the periodic reporting on PUSCH | SHARP | Noted |
R1‑081246 | Text Proposal on sequence ordering table of PRACH | LG Electronics | Noted |
R1‑081247 | Draft response to LS on implications of MIMO precoding schemes on RAN4 requirements | LG Electronics, Samsung, ETRI | Noted |
R1‑081248 | PRS sequence generation for downlink reference signal | LG Electronics | Noted |
R1‑081249 | Consideration on UL sounding operation | LG Electronics | Not treated |
R1‑081250 | Considerations on the design of transport block size table | LG Electronics | Not treated |
R1‑081251 | Randomization Function for PDCCH search space | LG Electronics | Revised |
R1‑081252 | PHICH resource allocation in TDD | LG Electronics | Missing |
R1‑081253 | PMI-field compression in PDCCH contents for 4 Tx MIMO | LG Electronics | Not treated |
R1‑081254 | Downlink Control Signaling for SU-MIMO | LG Electronics | Not treated |
R1‑081255 | Multiplexing of Rank, CQI and Data in PUSCH | LG Electronics | Not treated |
R1‑081256 | Handling problem with uplink ACK/NACK bundling | LG Electronics | Noted |
R1‑081257 | Uplink ACK/NACK resource allocation in TDD | LG Electronics | Revised |
R1‑081258 | Efficient Utilization of Unused PUCCH RB | LG Electronics | Not treated |
R1‑081259 | Consideration on Punctured PUCCH Format | LG Electronics | Not treated |
R1‑081260 | Downlink DVRB interleaver design | LG Electronics | Not treated |
R1‑081261 | SCH structure for dedicated MBMS | LG Electronics | Not treated |
R1‑081262 | Further System Level Evaluation of Closed-loop MIMO | LG Electronics | Not treated |
R1‑081263 | Detail of CQI coding on PUSCH piggybacked from PUCCH | LG Electronics | Noted |
R1‑081264 | Performance of ACK/NACK subcode in joint coding on PUCCH for extended CP | LG Electronics | Noted |
R1‑081265 | Consideration on Per-antenna Power Scaling for Full Power Transmission in 4Tx Antennas | LG Electronics | Not treated |
R1‑081266 | Further Consideration on 2Tx Open-loop SM | LG Electronics | Noted |
R1‑081267 | CQI Table for 4x2 Open Loop MIMO | Infineon Technologies | Not treated |
R1‑081268 | Clarification on the number of codes in HS-SCCH less first transmission | InterDigital Communications LLC | Revised |
R1‑081269 | Potential Issues Related to E-AICH Reliability | InterDigital Communications LLC | Noted |
R1‑081270 | Inter-cell interference with E-DCH in CELL_FACH | InterDigital Communications LLC | Revised |
R1‑081271 | Variable-length Block-Code for CQI on PUSCH | Marvell | Noted |
R1‑081272 | Edge treatment for frequency-selective CQI format on PUSCH | Marvell | Not treated |
R1‑081273 | Edge treatment for spatial differential CQI format on PUCCH | Marvell | Not treated |
R1‑081274 | Physical layer parameters to specify for trasmit antenna selection: Summary of remaining UL SRS related issues and way forward | Mitsubishi Electric | Not treated |
R1‑081275 | Combined fixed and adaptive resource allocation method for inter-cell interference coordination | Mitsubishi Electric | Not treated |
R1‑081276 | RACH email reflector summary | Motorola | Noted |
R1‑081277 | Remaining details on UL DM RS hopping pattern generation | Motorola | Missing |
R1‑081278 | Cyclic Shift values for UL RS | Motorola | Not treated |
R1‑081279 | Open Issues on UL Sounding RS | Motorola | Not treated |
R1‑081280 | Multiplexing of SRS and PUSCH | Motorola | Not treated |
R1‑081281 | Way forward on Indication of UE antenna selection for PUSCH | Motorola, Mitsubishi, Nortel | Not treated |
R1‑081282 | Uplink Grant Signalling for TDD | Motorola | Not treated |
R1‑081283 | Control Signalling for Single-Cell MBMS Transmission | Motorola | Not treated |
R1‑081284 | TBS and MCS Signaling and Tables | Motorola | Noted - Revised |
R1‑081285 | PHICH/UL Grant Resource Assignment and Dimensioning for TDD | Motorola | Noted |
R1‑081286 | PHICH resource signaling for TDD and FDD | Motorola | Not treated |
R1‑081287 | Open Issues on PDCCH Formats and Contents | Motorola | Not treated |
R1‑081288 | CCE Sizing | Motorola | Missing |
R1‑081289 | PDCCH Search Space Assignment Hashing Function | Motorola | Revised - Noted |
R1‑081290 | PDCCH Coverage 1248 vs 124 vs 12 with limited PC dynamic range | Motorola | Not treated |
R1‑081291 | Repetition of UL ACK/NACK on PUCCH | Motorola | Noted |
R1‑081292 | Uplink ACK/NACK for TDD | Motorola | Noted |
R1‑081293 | PUCCH ACK/NACK Transmission and Index Mapping for TDD | Motorola | Noted |
R1‑081294 | PUCCH CQI Payload Coverage Analysis | Motorola | Not treated |
R1‑081295 | Resource Provision for UL control in PUSCH | Motorola | Noted |
R1‑081296 | Control and Data Multiplexing on PUSCH | Motorola | Not treated |
R1‑081297 | Remaining details on Nd=2 DVRB operation | Motorola | Not treated |
R1‑081298 | Downlink DVRB email reflector summary | Motorola | Noted |
R1‑081299 | Uplink SCH Hopping email reflector summary | Motorola | Noted |
R1‑081300 | Remaining details on Nd=2 DVRB operation | Motorola | Missing |
R1‑081301 | Open issues on UL slot hopping | Motorola | Not treated |
R1‑081302 | PRACH Configuration for TDD | Motorola | Withdrawn |
R1‑081303 | Remaining DL:UL Allocation for TDD | Motorola | Noted |
R1‑081304 | RV for UL Subframe Bundling | Motorola | Not treated |
R1‑081305 | 36.213 CR0003 (Rel-8, F) Correct PUCCH assignment timing in section 10.1 and document formating | Motorola | Noted - Revised |
R1‑081306 | 36.213 CR0004 (Rel-8, F) Modify DL power control nomenclature to match R1-081134 | Motorola | Withdrawn |
R1‑081307 | 36.213 CR0005 (Rel-8, B) Proposed: intra-CCE REG EPRE requirement | Motorola | Revised |
R1‑081308 | Po for PUCCH and PUSCH | Motorola | Withdrawn |
R1‑081309 | Small fixes needed for UL-PC | Motorola | Noted |
R1‑081310 | Per Antenna Power Scaling on the PDSCH | Motorola | Not treated |
R1‑081311 | PHICH and PDCCH Power Control requirement | Motorola | Revised |
R1‑081312 | Set S for CQI feedback | Motorola | Not treated |
R1‑081313 | Timing relationship between RI, WB- and FS-CQI/PMI Reports on PUCCH | Motorola | Not treated |
R1‑081314 | Interference measurement for CQI report | Motorola | Withdrawn |
R1‑081315 | Mapping of precoded WB CQI to non-precoded WB CQI | Motorola | Missing |
R1‑081316 | LBRM for TDD | Motorola | Noted |
R1‑081317 | Resource allocation type modification to reduce PDCCH overhead | ASUSTeK | Not treated |
R1‑081318 | Dual Cell HSDPA Operation Consideration | HUAWEI | Noted |
R1‑081319 | Disscussion on the inter-cell interference for EUL | HUAWEI | Missing |
R1‑081320 | Default E-DCH resource | NEC Group | Noted |
R1‑081321 | DRS Pattern for Extended CP | CATT | Noted |
R1‑081322 | Overhead Reduction for BF | CATT | Revised |
R1‑081323 | DL HARQ timing for TDD | CATT | Noted |
R1‑081324 | Multi-TTI Scheduling for LTE TDD UL | CATT | Not treated |
R1‑081325 | Multiple ACK/NACKs transmission for TDD | CATT | Noted |
R1‑081326 | Indication of PHICH resource for TDD | CATT, RITT | Noted |
R1‑081327 | Sounding reference signals in UpPTS for TDD | CATT, CMCC, RITT, Ericsson, Huawei | Not treated |
R1‑081328 | UL HARQ timing for TDD | CATT | Noted |
R1‑081329 | LBRM for TDD | CATT | Noted |
R1‑081330 | On antenna calibration of LTE | CATT | Not treated |
R1‑081331 | Control Region on the PUSCH | Freescale Semiconductor | Not treated |
R1‑081332 | SRS Bandwidth and Starting Point Signaling | Freescale Semiconductor | Not treated |
R1‑081333 | CCE Size Selection and the Hashing Function | Freescale Semiconductor | Missing |
R1‑081334 | 25.224 CR0174R1 (Rel-7, Cat F) on EUL power control clarification for 1.28Mcps TDD | TD Tech | Agreed |
R1‑081335 | 25.224 CR0180 (Rel-7, Cat F) on power offset clarification for 1.28Mcps TDD | TD Tech | Withdrawn |
R1‑081336 | 25.222 CR0147 (Rel-7, Cat F) on E-HICH coding clarification for 1.28Mcps TDD | TD Tech | Revised |
R1‑081337 | 25.224 CR0181 (Rel-7, Cat F) on E-AGCH/E-HICH joint power control for 1.28Mcps TDD | TD Tech | Revised |
R1‑081338 | Dedicated RS design w/wo overhead reduction | TD Tech | Noted |
R1‑081339 | ACK/NACK Multiplexing in PUSCH in TDD | TD Tech | Noted |
R1‑081340 | Frequency hopping for TDD RACH | TD Tech | Noted |
R1‑081341 | DRX aspect in 1.28Mcps TDD enhanced CELL_FACH scope | TD Tech | Not treated |
R1‑081342 | Simulation results for standalone midamble | TD Tech | Revised |
R1‑081343 | Standalone midamble usage for ACK/NACK feedback in enhanced CELL_FACH state for 1.28Mcps TDD | TD Tech | Noted |
R1‑081344 | Mapping between HS-DSCH RNTI and E-RNTI in Ehanced CELL_FACH for 1.28mcps | TD Tech | Revised |
R1‑081345 | Procedural analysis of Enhanced Uplink for CELL_FACH state | TD Tech | Not treated |
R1‑081346 | Resource allocation method analysis of Enhanced Uplink for CELL_FACH state | TD Tech | Not treated |
R1‑081347 | Discussion on reducing downlink signalling overhead in eFACH state | TD Tech | Noted |
R1‑081348 | Uplink reference signal design for 1.28Mcps TDD CPC scope | TD Tech | Not treated |
R1‑081349 | Some suggestions on scheduling in CPC for 1.28Mcps TDD | TD Tech | Noted |
R1‑081350 | DTX/DRX aspect for 1.28Mcps TDD CPC | TD Tech | Missing |
R1‑081351 | MIMO simulation results for 1.28Mcps TDD HSPA+ scope | TD Tech | Noted |
R1‑081352 | Text proposal to TR 25.824 for 1.28Mcps TDD Layer 2 Enhancement | TD Tech | Agreed |
R1‑081353 | Performance Targets for AICH/E-AICH based E-DCH Resource Allocation Scheme | Qualcomm Europe | Noted |
R1‑081354 | Efficient utilization of DL HS-resources in CELL_FACH | Qualcomm Europe | Noted |
R1‑081355 | Link Analysis of HS-SCCH based and E-RGCH based Serving Cell Change Command Schemes | Qualcomm Europe | Noted |
R1‑081356 | Link Analysis of Dual Scrambling Code and CQI31 based Serving Cell Change Confirmation schemes | Qualcomm Europe | Noted |
R1‑081357 | Inter-cell Interference Cancellation in CELL_DCH and CELL_FACH | Qualcomm Europe | Noted |
R1‑081358 | HS-DPCCH Design for Dual Carrier HSDPA | Qualcomm Europe | Noted |
R1‑081359 | Link Analysis of HS-DPCCH ACK/NACK for Dual Carrier HSDPA | Qualcomm Europe | Noted |
R1‑081360 | Link Analysis of HS-DPCCH CQI for Dual Carrier HSDPA | Qualcomm Europe | Noted |
R1‑081361 | System Benefits of Dual Carrier HSDPA | Qualcomm Europe | Noted |
R1‑081362 | TR skeleton | Qualcomm Europe | Revised |
R1‑081363 | Introduction of 25.321 CR on EUL TBS table change | RITT, TD Tech, CATT, ZTE, Spreadtrum | Noted |
R1‑081364 | Sounding Reference Signal In Support of Scheduling Request in E-UTRA | Texas Instruments | Not treated |
R1‑081365 | UL DM RS Cyclic Shift Values and Hopping Formula | Texas Instruments | Not treated |
R1‑081366 | Views on SRS Parameters | Texas Instruments | Not treated |
R1‑081367 | PDCCH Content and Formats | Texas Instruments | Not treated |
R1‑081368 | Blind decoding for PDCCH | Texas Instruments | Missing |
R1‑081369 | Supportable MCS for E-UTRA Downlink | Texas Instruments | Not treated |
R1‑081370 | Coding of control information on PUSCH | Texas Instruments | Not treated |
R1‑081371 | Error protection of CQI reporting | Texas Instruments | Not treated |
R1‑081372 | ACK/NAK Repetition in EUTRA Uplink | Texas Instruments | Not treated |
R1‑081373 | Explicit DTX Signaling with ACK/NAK Bundling in TDD | Texas Instruments, Huawei | Noted |
R1‑081374 | On Remaining Issues of PUCCH Slot Based CS/OC Remapping | Texas Instruments, Samsung, Panasonic | Not treated |
R1‑081375 | Dynamic ACK/NAK Channelization on PUCCH | Texas Instruments | Not treated |
R1‑081376 | SRI Resource Configuration on PUCCH | Texas Instruments | Not treated |
R1‑081377 | Performance of Scheduling Requests through SRI and PRACH | Texas Instruments | Not treated |
R1‑081378 | Interference between Sounding Reference Signal and PRACH | Texas Instruments | Not treated |
R1‑081379 | Performance of wideband precoding and small delay CDD | Texas Instruments | Noted |
R1‑081380 | Analysis on Downlink Power Setting | Texas Instruments | Revised |
R1‑081381 | Dynamic Range of Downlink Power Setting | Texas Instruments | Not treated |
R1‑081382 | Remaining Issues on CQI/PMI/RI Reporting | Texas Instruments | Revised |
R1‑081383 | CQI Reporting on PUSCH | Texas Instruments | Not treated |
R1‑081384 | TDD Uplink HARQ Timing Design | CMCC, Huawei | Revised |
R1‑081385 | CQI Table for 2x2 Open Loop MIMO | Infineon Technologies | Not treated |
R1‑081386 | Downlink Control Signaling for MU-MIMO | InterDigital Communications LLC | Not treated |
R1‑081387 | PDCCH MIMO Format Options for e-UTRA | InterDigital Communications LLC | Not treated |
R1‑081388 | Way forward on mandatory DRS operation for LTE TDD UE | CMCC, RITT, CATT, Huawei, ZTE, TD-Tech | Noted |
R1‑081389 | Remaining Issue of Soft Buffer Configuration in LBRM for Dual Codeword MIMO | Freescale Semiconductor | Not treated |
R1‑081390 | Remaining Issue for Rank feedback configuration | Freescale Semiconductor | Not treated |
R1‑081391 | 25.224 CR0182 (Rel-7, F) Use of Special Bursts for DTX on FACH in 1.28 Mcps TDD | Spreadtrum Communications | Revised |
R1‑081392 | SCH design for dedicated MBMS | Huawei | Not treated |
R1‑081393 | Control Signaling of MBMS Single-Cell Transmission | Huawei | Resubmission of R1-081026 |
R1‑081394 | Proposal of CG sequence hopping in group planning - Resubmission of R1-081025 | Huawei | Not treated |
R1‑081395 | Consideration on identification of interior users/exterior users for ICIC | Huawei | Not treated |
R1‑081396 | Downlink Multiplexing for Persistent and Dynamic scheduling | NEC Group | Not treated |
R1‑081397 | Details of the Common and UE Specific Search spaces | NEC Group | Missing |
R1‑081398 | Remaining issues for DVRB to PRB mapping | NEC Group | Not treated |
R1‑081399 | 25.222 CR0148 (Rel7, F) Clarification of TRRI on E-AGCH for 1.28Mcps TDD EUL | CATT, TD-Tech, ZTE | Revised |
R1‑081400 | 25.222 CR0149 (Rel7, F) Correction and clarification of some E-HICH coding issues for 1.28 Mcps TDD EUL | CATT, TD-Tech | Revised |
R1‑081401 | 25.224 CR0183 (Rel7, F) Correction of E-PUCH power control for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑081402 | 25.224 CR0184 (Rel7, F) Clarification of the E-AGCH monitering for 1.28Mcps TDD EUL | CATT | Revised |
R1‑081403 | Solutions for CPC for 1.28Mcps TDD | CATT | Noted |
R1‑081404 | Simulation Results of 8×2 MIMO schemes for 1.28Mcps TDD system | CATT | Noted |
R1‑081405 | Sounding RS Parameters in E-UTRA Uplink | NTT DoCoMo | Not treated |
R1‑081406 | Hashing Function Generation for PDCCH Blind Decoding | NTT DoCoMo | Not treated |
R1‑081407 | Necessity of ACK/NACK Repetition | NTT DoCoMo | Not treated |
R1‑081408 | Investigation on Throughput Performance of MU-MIMO in E-UTRA Downlink | NTT DoCoMo | Not treated |
R1‑081409 | 25.223 CR0052 (Rel-8, B) Introduction the 64QAM constellation for 1.28 Mcps TDD HSDPA | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | Agreed |
R1‑081410 | PHICH Resource Mapping in TDD | ZTE | Not treated |
R1‑081411 | PUSCH Hopping Resource Allocation Via Grant | ZTE | Noted |
R1‑081412 | DVRB To PRB Mapping | ZTE | Revised |
R1‑081413 | ACK/CQI Joint Encoding on PUCCH with Extended CP | ZTE, CHTTL | Revised |
R1‑081414 | ACK/CQI Joint Encoding on PUCCH with Normal CP | ZTE, CHTTL | Revised |
R1‑081415 | Support to Live-Change of Downlink-Uplink Allocation Ratio in LTE TDD | ZTE | Noted |
R1‑081416 | Signaling of the Precoder for DL MU-MIMO | ZTE, CHTTL | Not treated |
R1‑081417 | Dedicated RS Pattern for Extended CP | ZTE | Noted |
R1‑081418 | Implicit Mapping of AKC/NACK Resources | ZTE | Not treated |
R1‑081419 | Modification of Cyclic Shift Hopping for CQI | ZTE | Not treated |
R1‑081420 | Improvement of Random Access Preamble Timing for FDD | ZTE | N |
R1‑081421 | Configurations and Location Mapping for TDD PRACH | ZTE, CHTTL | Revised |
R1‑081422 | PHICH Resource Mapping in TDD | ZTE | Withdrawn |
R1‑081423 | Handover Region Based Cell Interior/Edge Users Classification Method for ICIC Applications | CHTTL, ITRI | Not treated |
R1‑081424 | 25213CR0092 (Rel-7, F) Range of E-DCH amplitude ratios with QPSK | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑081425 | 25213CR0093 (Rel-8, A) Range of E-DCH amplitude ratios with QPSK | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑081426 | 25214CR0481 (Rel-7, F) CPC DRX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Revised |
R1‑081427 | 25214CR0482 (Rel-8, A) CPC DRX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Revised |
R1‑081428 | On the benefits of Intercell interference cancellation to HSPA networks | Nokia Siemens Networks | Noted |
R1‑081429 | Draft 25211 CR on AICH/E-AICH | Nokia Siemens Networks, Nokia | Noted |
R1‑081430 | On L1 synchronisation | Nokia Siemens Networks, Nokia | Noted |
R1‑081431 | Draft 25214 CR on L1 synchronisation and random access procedure | Nokia Siemens Networks, Nokia | Noted |
R1‑081432 | Channel timings after acquisition | Nokia Siemens Networks, Nokia, Samsung | Noted |
R1‑081433 | Proposed method for improving the reliability of the HS-PDSCH Serving Cell Change procedure | Nokia, Nokia Siemens Networks | Noted |
R1‑081434 | Considerations on the dual cell HSDPA operation | Nokia, Nokia Siemens Networks | Noted |
R1‑081435 | Analysis of Inter-Cell Interference in CELL_FACH | Qualcomm Europe | Noted |
R1‑081436 | System Performance of ICIC | Qualcomm Europe | Revised |
R1‑081437 | Dual Carrier HSDPA assumptions and standards impact | Qualcomm Europe | Noted |
R1‑081438 | Dual Carrier operation for CELL_DCH | Qualcomm Europe | Noted |
R1‑081439 | Optionality of E-DPCCH power boosting | NEC, Fujitsu, Motorola, Panasonic, Sharp | Noted |
R1‑081440 | RACH location in the frequency domain | LG Electronics | Not treated |
R1‑081441 | Comments and Simulation Results Related to RAN2 LS on BCCH Transmission (R1-080632) | Nokia Siemens Networks, Nokia | Noted |
R1‑081442 | UE Specific RS pattern for extended CP | Nokia, Nokia Siemens Networks | Noted |
R1‑081443 | Confliction between UE Specific RS with P/S-SCH and P-BCH | Nokia, Nokia Siemens Networks | Noted |
R1‑081444 | Cyclic shift value definition for PUSCH demodulation RS | Nokia Siemens Networks, Nokia | Not treated |
R1‑081445 | Frequency hopping arrangement for SRS | Nokia Siemens Networks, Nokia | Not treated |
R1‑081446 | SRS Bandwidth Selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑081447 | PDCCH decoding complexity and associated hashing functions | Nokia, Nokia Siemens Networks | Not treated |
R1‑081448 | DCI and CCE size | Nokia, Nokia Siemens Networks | Not treated |
R1‑081449 | Associated PDCCH signaling for PCH, RACH response and BCCH transmission on PDSCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑081450 | LTE TDD UL Multi-TTI Scheduling | Nokia, Nokia Siemens Networks | Not treated |
R1‑081451 | General on PDCCH DL/UL grant of TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑081452 | Downlink scheduling for ACK/NACK bundling | Nokia, Nokia Siemens Networks | Not treated |
R1‑081453 | PHICH resource mapping and dimensioning for TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑081454 | Chicken-and-egg problem of PHICH resource indication in TDD | Nokia, Nokia Siemens Networks | Noted |
R1‑081455 | Multiplexing between Rank and SR | Nokia Siemens Networks, Nokia | Not treated |
R1‑081456 | DTX detection in case of simultaneous transmission of SR and ACK/NACK | Nokia Siemens Networks, Nokia | Not treated |
R1‑081457 | Linkage between PUSCH MCS and amount of resources for ACK/NACK on PUSCH | Nokia Siemens Networks, Nokia | Noted |
R1‑081458 | Avoiding PUSCH error situations caused by DL allocation grant signalling failure | Nokia Siemens Networks, Nokia | Not treated |
R1‑081459 | CQI+Ack/Nack Subcode details | Nokia Siemens Networks, Nokia | Noted |
R1‑081460 | Channelization of SRI and persistent ACK/NACK on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑081461 | Coverage Comparison between PUSCH, PUCCH and RACH | Nokia Siemens Networks, Nokia, CATT | Noted |
R1‑081462 | DL EPRE Setting | Nokia, Nokia Siemens Networks | Not treated |
R1‑081463 | Summary of power control email discussion | Nokia Siemens Networks | Noted |
R1‑081464 | Triggers for Power Headroom Reports in EUTRAN Uplink | Nokia Siemens Networks, Nokia | Noted |
R1‑081465 | Definition of Relative Narrowband TX Power Indicator for DL ICIC | Nokia Siemens Networks, Nokia | Noted |
R1‑081466 | Definition of the uplink overload indicator | Nokia Siemens Networks, Nokia | Noted |
R1‑081467 | CQI estimation methodology | Nokia Siemens Networks, Nokia | Noted |
R1‑081468 | Configuration of periodic CQI reporting on PUSCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑081469 | Number of spatially multiplexed users for LTE DL MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
R1‑081470 | Channel Quality Indicator for LTE MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
R1‑081471 | Effect of Precoding Granularity on LTE Multiuser MIMO | Nokia, Nokia Siemens Networks | Not treated |
R1‑081472 | DL signaling for closed loop antenna selection in LTE UL | Nokia, Nokia Siemens Networks, Ericsson | Noted |
R1‑081473 | DL HARQ Timing for TDD(Timing btw PDSCH and UL AckNack) | Nokia, Nokia Siemens Networks | Noted |
R1‑081474 | UL HARQ Timing for TDD(Timing btw PUSCH and PHICH/Grant) | Nokia, Nokia Siemens Networks | Noted |
R1‑081475 | Soft Buffer Allocation | Nokia, Nokia Siemens Networks | Noted |
R1‑081476 | RS power boosting and interference estimation issues | Qualcomm Europe | Not treated |
R1‑081477 | Frequency shift for UE specific RS | Qualcomm Europe | Not treated |
R1‑081478 | Remaining issues for UL DM-RS hopping | Qualcomm Europe | Not treated |
R1‑081479 | Remaining issues on PDCCH formats and contents | Qualcomm Europe | Not treated |
R1‑081480 | PDCCH format for Paging | Qualcomm Europe | Not treated |
R1‑081481 | Remaining issues on PDCCH search space definitions | Qualcomm Europe | Not treated |
R1‑081482 | Specification details for PHICH transmission for extended CP and more | Qualcomm Europe | Not treated |
R1‑081483 | Conveying MCS and TB size via PDCCH | Qualcomm Europe | Not treated |
R1‑081484 | On the need for MCS with code rate > 1 for UL transmissions | Qualcomm Europe | Not treated |
R1‑081485 | Control in support of DL MU-MIMO operation | Qualcomm Europe | Not treated |
R1‑081486 | UL control details for TDD | Qualcomm Europe | Noted |
R1‑081487 | Support of DTX signalling for CQI transmission with normal CP | Qualcomm Europe | Not treated |
R1‑081488 | Limiting the constellation size of ACK transmissions in PUSCH | Qualcomm Europe | Noted |
R1‑081489 | Improved staggering pattern for PUCCH format 1 | Qualcomm Europe | Not treated |
R1‑081490 | Confirmation of various UL transmission configurations | Qualcomm Europe | Not treated |
R1‑081491 | Further details on DL distributed transmissions | Qualcomm Europe | Not treated |
R1‑081492 | Issues with current scrambling sequence generation | Qualcomm Europe | Noted |
R1‑081493 | Antenna configuration for mixed unicast/MBSFN subframes | Qualcomm Europe | Not treated |
R1‑081494 | On the signalling of Data/RS power ratio for PDSCH with 16QAM | Qualcomm Europe | Not treated |
R1‑081495 | Feedback needed in support of TDD precoding | Qualcomm Europe | Not treated |
R1‑081496 | Definition of measurement gaps in 36.213 | Qualcomm Europe | Not treated |
R1‑081497 | Further details on UL ACK/NAK resource allocation | Qualcomm Europe | Not treated |
R1‑081498 | Support of ACK repetition in the UL of E-UTRA | Qualcomm Europe | Not treated |
R1‑081499 | Further details on coding of UL control information | Qualcomm Europe | Noted |
R1‑081500 | Clarifications on UE selected CQI reports | Qualcomm Europe | Noted |
R1‑081501 | Interleaver for PUCCH | Qualcomm Europe | Not treated |
R1‑081502 | PUCCH format 1 transmission | Qualcomm Europe | Noted |
R1‑081503 | Remaining issues on UE-specific RS | Philips | Not treated |
R1‑081504 | Analysis of search space design for PDCCH blind decoding | Philips | Noted |
R1‑081505 | Hashing function for starting-point of UE-specific search space | Philips | Missing |
R1‑081506 | PDCCH message information content for persistent scheduling | Philips, NXP | Not treated |
R1‑081507 | Distributed Resource Allocation Signalling on PDCCH | Philips, NXP | Not treated |
R1‑081508 | Index for PDCCH signalling of UL resource allocation in conjunction with DRX | Philips, NXP | Not treated |
R1‑081509 | PDCCH message for paging | Philips, NXP | Not treated |
R1‑081510 | Codebook for MU-MIMO | Philips, NXP | Not treated |
R1‑081511 | CQI definition for MU-MIMO | Philips, NXP | Not treated |
R1‑081512 | UE procedure for ACK/NACK detection | Philips, NXP | Noted |
R1‑081513 | RACH procedure for E-DCH in Cell_FACH | Philips | Noted |
R1‑081514 | 25.213 CR0094 (Rel-7, F) Restricted Beta Factor Combinations for UL 16QAM | Ericsson | Revised |
R1‑081515 | 25.212 CR0262 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Noted |
R1‑081516 | 25.214 CR0483 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Revised |
R1‑081517 | EUL coverage enhancements | Ericsson | Revised |
R1‑081518 | Draft CR on Correction of the number of subcarriers in PUSCH transform precoding | Ericsson | Endorsed - Revised |
R1‑081519 | Draft CR on Correction of PHICH mapping | Ericsson | Endorsed - Revised |
R1‑081520 | Draft CR on Correction of PUCCH resource index for PUCCH format 2 | Ericsson | Endorsed - Revised |
R1‑081521 | Uplink DM RS hopping | Ericsson | Not treated |
R1‑081522 | Summary of email discussions on DL control signalling | Ericsson | Noted |
R1‑081523 | Uplink grant signaling for TDD | Ericsson | Not treated |
R1‑081524 | PHICH and UL HARQ timing and association for TDD | Ericsson | Noted |
R1‑081525 | PDCCH contents | Ericsson | Noted |
R1‑081526 | On retransmission support for 4-Tx MIMO | Ericsson | Not treated |
R1‑081527 | Summary of email discussions on UL control signalling | Ericsson | Noted |
R1‑081528 | Details of ACK/NAK bundling for TDD | Ericsson | Revised |
R1‑081529 | On ACK/NAK repetition | Ericsson | Noted |
R1‑081530 | PRACH configurations for TDD | Ericsson | Withdrawn |
R1‑081531 | Start of RA preamble format 4 | Ericsson | Not treated |
R1‑081532 | Remaining issues on Downlink RS boosting | Ericsson | Not treated |
R1‑081533 | PUCCH power control for non-unicast information | Ericsson | Noted |
R1‑081534 | Draft CR on Correction of PUCCH power control | Ericsson | Noted - Revised |
R1‑081535 | Trigger criteria for power headroom reporting | Ericsson | Noted |
R1‑081536 | Additional RSRP reporting trigger for ICIC | Ericsson | Noted |
R1‑081537 | Further considerations on the use of inter-cell interference indication | Ericsson | Not treated |
R1‑081538 | Frequency-Selective CQI Reporting on PUCCH | Ericsson | Noted |
R1‑081539 | UE Interference Measurement for CQI | Ericsson | Noted |
R1‑081540 | Rank Override Support for PMI Confirmation | Ericsson | Not treated |
R1‑081541 | On antenna selection and small delay CDD for LTE | Ericsson | Revised |
R1‑081542 | Uplink ACK/NACK timing for TDD | Ericsson | Noted |
R1‑081543 | Enhanced Uplink for Cell_FACH State in FDD | Ericsson | Noted |
R1‑081544 | HS-PDSCH Serving Cell Change Enhancements | Ericsson | Noted |
R1‑081545 | Considerations on Dual-Cell HSDPA Operation | Ericsson | Noted |
R1‑081546 | Initial Multi-Carrier HSPA performance evaluation | Ericsson | Noted |
R1‑081547 | Power Offsets to Support PUSCH Data and Control Multiplexing | Alcatel-Lucent | Not treated |
R1‑081548 | Semi-Static Interference Coordination Method | Alcatel-Lucent | Not treated |
R1‑081549 | Support for Semi-Static Inter cell Interference Coordination | Alcatel-Lucent, Nortel Networks | Not treated |
R1‑081550 | UL Hopping Transmission with grant based frequency^^shift information | Alcatel-Lucent | Noted |
R1‑081551 | eNodeB Indicator definition for ^^ “Maximum Tx Power per PRB normalized” | Alcatel-Lucent | Not treated |
R1‑081552 | X2-signalling of eNodeB Max Tx Power per PRB report | Alcatel-Lucent | Not treated |
R1‑081553 | Signaling of MU-MIMO precoding vector | Huawei | Not treated |
R1‑081554 | PMI bit length for EUTRA TDD | Via Technology | Missing |
R1‑081555 | Physical Channel for P_A Signaling | NEC Group | Not treated |
R1‑081556 | Reconsideration on 2 Tx Codebook for Precoding | NEC Group | Revised |
R1‑081557 | Link level results of MIMO for the antenna array based 1.28 Mcps TDD system | ZTE | Noted |
R1‑081558 | Analysis of TD-SCDMA HSPA plus Downlink CPC Solution | ZTE | Noted |
R1‑081559 | Analysis of TD-SCDMA HSPA plus Uplink CPC Solution | ZTE | Noted |
R1‑081560 | 25.201 CR0039 (Rel-8, B) Introduction 64QAM for 1.28Mcps TDD HSDPA | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑081561 | 25.221 CR0155 (Rel-8, B) Introduction 64QAM for 1.28Mcps TDD HSDPA | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑081562 | 25.222 CR0150 (Rel-8, B) Introduction 64QAM for 1.28Mcps TDD HSDPA | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Revised |
R1‑081563 | On UL/DL frame timing for TDD | Ericsson | Noted |
R1‑081564 | A Proposal for Set S | NEC Group | Not treated |
R1‑081565 | Refinement on MIMO Precoding Schemes | Ericsson, Fujitsu, Motorola, NEC, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Texas Instruments | Noted |
R1‑081566 | Details of ACK/NAK bundling for TDD | Ericsson | Noted |
R1‑081567 | Randomization Function for PDCCH search space | LG Electronics | Not treated |
R1‑081568 | Uplink ACK/NACK resource allocation in TDD | LG Electronics | Noted |
R1‑081569 | ACK/CQI Joint Encoding on PUCCH with Extended CP | ZTE, CHTTL | Noted |
R1‑081570 | ACK/CQI Joint Encoding on PUCCH with Normal CP | ZTE, CHTTL | Not treated |
R1‑081571 | Configurations and Location Mapping for TDD PRACH | ZTE, CHTTL, CMCC, Nokia, Nokia Siemens Networks, Huawei, RITT | Noted |
R1‑081572 | Overhead Reduction for BF | CATT | Noted |
R1‑081573 | Comments on RAN4 LS on MIMO precoding (R1-081179) | Nortel | Noted |
R1‑081574 | Draft report of RAN1#52 meeting | MCC Support | Approved |
R1‑081575 | Reconsideration on 2 Tx Codebook for Precoding | NEC Group, NTT DoCoMo | Noted |
R1‑081576 | 36.211 CR0004 (Rel-8, F) on Correction of the number of subcarriers in PUSCH transform precoding | Ericsson | Agreed |
R1‑081577 | 36.211 CR0005 (Rel-8, F) on Correction of PHICH mapping | Ericsson | Agreed |
R1‑081578 | 36.211 CR0006 (Rel-8, F) on Correction of PUCCH resource index for PUCCH format 2 | Ericsson | Agreed |
R1‑081579 | TDD Uplink HARQ Timing Design | CMCC, Huawei | Noted |
R1‑081580 | Updated LS on implications of MIMO precoding schemes on RAN4 requirements | RAN4, Ericsson | Withdrawn |
R1‑081581 | 25.222 CR0150R1 (Rel-8, B) Introduction 64QAM for 1.28Mcps TDD HSDPA | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑081582 | 36.213 CR0009 (Rel-8, F) UL ACK/NACK timing for TDD | Ericsson, CATT, Motorola, Nokia, Nokia Siemens Networks, LGE | Agreed |
R1‑081583 | 36.213 CR0003R1 (Rel-8, F) Correct PUCCH assignment timing in section 10.1 and document formating | Motorola | Agreed |
R1‑081584 | 36.213 CR0008 (Rel-8, F) UE ACK/NACK procedure | Philips, Motorola, NXP, Qualcomm, Panasonic | Agreed |
R1‑081585 | Simulation comparison between ACK/CQI joint coding and code word puncturing methods on PUCH with Extended CP | ZTE | Not treated |
R1‑081586 | PDCCH Search Space Assignment Hashing Function | Motorola | Noted - Revised |
R1‑081587 | void | - | - |
R1‑081588 | Analysis on Downlink Power Setting | Texas Instruments | Not treated |
R1‑081589 | MCS Table Design- Outcome of offline discussions | Ad-Hoc moderator (Ericsson) | Agreed |
R1‑081590 | LS on RAN2 status on Enhanced uplink for CELL_FACH state in FDD | RAN2, Huawei | Noted |
R1‑081591 | Draft LS on information about RAN1 assumptions regarding TPC-PDCCH | Ericsson | Revised |
R1‑081592 | Draft LS on information about new PDCCH Format 1C | Ericsson | Revised |
R1‑081593 | 36.213 CR0005R1 (Rel-8, B) Proposed: intra-CCE REG EPRE requirement | Motorola | Noted |
R1‑081594 | PHICH and PDCCH Power Control requirement | Motorola | Noted |
R1‑081595 | Email discussion summary on ICIC | Telecom Italia | Noted |
R1‑081596 | 25.224 CR0182R1 (Rel-7, F) Use of Special Bursts for DTX on FACH in 1.28 Mcps TDD | Spreadtrum Communications, CATT, RITT, ZTE, TD Tech | Agreed |
R1‑081597 | Inter-cell interference with E-DCH in CELL_FACH | InterDigital Communications LLC | Noted |
R1‑081598 | 25.212 CR0263 (Rel-7, F) Clarification to number of HS-PDSCH codes in HS-SCCH less operations | InterDigital Communications LLC | Revised |
R1‑081599 | 25.212 CR0264 (Rel-8, F) Clarification to number of HS-PDSCH codes in HS-SCCH less operations | InterDigital Communications LLC | Revised |
R1‑081600 | Draft LS on information about RAN1decision regarding downlink power settings | Nokia | Revised |
R1‑081601 | Simulation results for standalone midamble | TD Tech | Noted |
R1‑081602 | Mapping between HS-DSCH RNTI and E-RNTI in Ehanced CELL_FACH for 1.28mcps | TD Tech | Not treated |
R1‑081603 | Way forward on UL/DL allocation detection | CATT, CMCC, RITT, Ericsson, Huawei, Motorola, Nokia, Nokia Siemens Networks, Panasonic, Qualcomm, Samsung, ZTE | Noted |
R1‑081604 | Way forward for power headroom reporting | Ericsson, Nokia Siemens Network, Nokia, Qualcomm, Panasonic, Alcatel-Lucent | Revised |
R1‑081605 | Remaining details on uplink PUSCH hopping | Samsung, LGE, Qualcomm, ZTE | Noted |
R1‑081606 | Mapping between PDCCH index and UL A/N index for Dynamic A/N Channels | Samsung, Panasonic, TI, Qualcomm, Ericsson | Noted |
R1‑081607 | Draft LS on SI-1 transmission | Ericsson | Revised |
R1‑081608 | 36.213 CR0006 (Rel-8, F) PUCCH power control for non-unicast information | Ericsson | Revised |
R1‑081609 | 36.213 CR0010 (Rel-8, F) Specification of UL control channel assignment | Ericsson | Agreed |
R1‑081610 | Skeleton TR | Nokia, Nokia Siemens Networks | Noted |
R1‑081611 | On the bit order & decoding complexity of subset coding | Ericsson | A |
R1‑081612 | 36.213 Draft CR on SRS Power Control | Motorola, NTT DoCoMo | Revised |
R1‑081613 | 25214CR0481R1 (Rel-7, F) CPC DRX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Revised |
R1‑081614 | 25214CR0482R1 (Rel-8, A) CPC DRX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Revised |
R1‑081615 | System Performance of ICIC | Qualcomm Europe | Noted |
R1‑081616 | Multiplexing of Rank and CQI/PMI in PUSCH channel | Samsung, LGE, | Not treated |
R1‑081617 | 25.213 CR0094r1 (Rel-7, F) Restricted Beta Factor Combinations for UL 16QAM | Ericsson | Noted - Revised |
R1‑081618 | 25.214 CR0483r1 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Noted |
R1‑081619 | EUL coverage enhancements | Ericsson | Noted |
R1‑081620 | Fast forwarding Gold sequence for random number sequence generation | LG Electronics, Ericsson, Nokia Siemens Networks, Nokia, Samsung, Qualcomm | Noted |
R1‑081621 | Correction to UE PUSCH Hopping procedure | Samsung | Noted |
R1‑081622 | Way forward for DVRB | Panasonic, Motorola, LGE, NEC, Nortel, Ericsson | Agreed |
R1‑081623 | Explanation of DVRB way forward | Panasonic, LGE, Motorola, Nortel, Ericsson, NEC | Not treated |
R1‑081624 | Remaining Issues on CQI/PMI/RI Reporting | Texas Instruments | Noted |
R1‑081625 | 36.211 Draft CR on Limiting the constellation size of ACK transmission when transmitted in PUSCH | Qualcomm Europe | Revised |
R1‑081626 | Decoder for 36.213 UL hopping resource allocations | Motorola | Noted |
R1‑081627 | DVRB To PRB Mapping | ZTE | Missing |
R1‑081628 | Range of E-DCH amplitude ratios with QPSK | Nokia, Nokia Siemens Networks | Agreed |
R1‑081629 | 25.213 CR0094r2 (Rel-7, F) Restricted Beta Factor Combinations for UL 16QAM | Ericsson | Withdrawn |
R1‑081630 | CPC DTX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Agreed |
R1‑081631 | Clarification on the number of codes in HS-SCCH less first transmission | InterDigital Communications LLC | Revised |
R1‑081632 | 25.222 CR0148R1 (Rel7, F) Clarification of TRRI on E-AGCH for 1.28Mcps TDD EUL | CATT, TD-Tech, ZTE | Agreed |
R1‑081633 | 25.222 CR0149R1 (Rel7, F) Correction of E-HICH coding issues for 1.28 Mcps TDD EUL | CATT, TD-Tech | Agreed |
R1‑081634 | 25.222 CR0147R1 (Rel-7, F) on E-HICH coding clarification for 1.28Mcps TDD | TD Tech | Agreed |
R1‑081635 | 25.224 CR0184R1 (Rel7, F) Clarification of the E-AGCH monitering for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑081636 | 25.224 CR0181R1 (Rel-7, Cat F) on E-AGCH/E-HICH joint power control for 1.28Mcps TDD | TD Tech | Agreed |
R1‑081637 | 36.211 CR0007 (Rel-8, F) Correction of the predefined hopping pattern for PUSCH | Samsung | Revised |
R1‑081638 | TBS and MCS Signaling and Tables | Motorola | Noted |
R1‑081639 | Clarification on the number of codes in HS-SCCH less first transmission | InterDigital Communications LLC | Agreed |
R1‑081640 | Way forward and Text proposal for DRS confliction issue | CATT, CMCC, Ericsson, Huawei, Nokia, Nokia Siemens Networks, Nortel, RITT | Not treated |
R1‑081641 | Way forward and Text proposal for DRS issue | Nortel, ZTE, CATT, Ericsson, Nokia, Nokia Siemens Networks, RITT | Noted |
R1‑081642 | Draft LS on E-AICH Power Offset and Error Targets for AICH/E-AICH | Qualcomm Europe | Revised |
R1‑081643 | Reply LS to HS-DPCCH usage with Enhanced Uplink in Cell_FACH | RAN3, Nokia Siemens Networks | Noted |
R1‑081644 | LS on Half-Duplex FDD | RAN4, Ericsson | Noted |
R1‑081645 | Physical-layer parameters to be configured by RRC | Ericsson | Noted |
R1‑081646 | PB values | Ericsson | Not treated |
R1‑081647 | LS on E-UTRAN Neighbour Cell list information for GERAN | GERAN2, Telecom Italia, Vodafone | Noted |
R1‑081648 | 25.211 DRAFT CR Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips Qualcomm, Samsung | Agreed |
R1‑081649 | 25.214 DRAFT CR Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation | Nokia Siemens Networks, Nokia, Ericsson, InterDigital, Samsung | Agreed |
R1‑081650 | Introduction of PSRC scheme for 1.28Mcps TDD MIMO system | TD Tech, CATT, ZTE | Noted |
R1‑081651 | Summary of the DVRB ad hoc session | Ad-Hoc moderator (NTT DoCoMo) | Not treated |
R1‑081652 | Summary of the Channel Coding ad hoc session | Ad-Hoc moderator (NTT DoCoMo) | Agreed |
R1‑081653 | Summary of the UE Categories ad hoc session | Ad-Hoc moderator (NTT DoCoMo) | Noted |
R1‑081654 | Way forward on Block coding for UL control information | LG Electronics, Ericsson, Broadcom, Motorola, Qualcomm, ETRI, TI, Samsung | Agreed |
R1‑081655 | TR skeleton | Qualcomm Europe | Noted |
R1‑081656 | TR skeleton | Qualcomm Europe | Revised |
R1‑081657 | 36.213 CR0011 (Rel-8, F) Precoding Matrix for 2Tx Open-loop SM | LGE | Agreed |
R1‑081658 | 36.213 CR0012 (Rel-8, C) Clarifications on UE selected CQI reports | Qualcomm Europe | Agreed |
R1‑081659 | Draft LS on CQI reference period | Panasonic | Revised |
R1‑081660 | Information on the isolated impact analysis | Panasonic | Approved |
R1‑081661 | Summary of off line discussions on E-UTRA DL RS | Samsung | Agreed |
R1‑081662 | Summary of off line discussions on E-UTRA UL RS | Samsung | Agreed |
R1‑081663 | LS on UL subframe transmission symbol of sounding reference signals | Samsung | Agreed |
R1‑081664 | Summary of the Downlink Procedure | Ad Hoc moderator (Samsung) | Noted |
R1‑081665 | 36.211 CR0008 (Rel-8, F) Non binary hashing functions | Qualcomm Europe | Agreed |
R1‑081666 | 36.211 CR0009 (Rel-8, F) PUCCH format 1 | Qualcomm Europe | Revised |
R1‑081667 | 36.212 CR0003 (Rel-8, F) Joint coding for CQI and ACK on PUCCH | Qualcomm Europe | Agreed |
R1‑081668 | Way Forward for Antenna Selection | Nortel, Alcatel-Lucent | Noted |
R1‑081669 | Draft response to LS on implications of MIMO schemes on RAN4 requirements R1-081179 (R4-080426) | Nortel, Alcatel-Lucent, Philips, Vodafone, Verizon, Orange, T-Mobile | Not treated |
R1‑081670 | Way forward for UL HARQ timing and multi TTI scheduling | CMCC, Huawei, Ericsson, Nokia, NSN, CATT, RITT, Motorola, ZTE, Samsung, LGE | Agreed |
R1‑081671 | Summarry of TDD ad hoc session | Ad Hoc moderator (NTT DoCoMo) | Noted |
R1‑081672 | PDCCH Search Space Assignment Hashing Function | Motorola | Not treated |
R1‑081673 | Draft 36.211 CR on UL DM RS Hopping | Ericsson | Revised |
R1‑081674 | Way forward on TDD PRACH configurations | ZTE, CATT, CMCC, Ericsson, Motorola, Nokia, Nokia Siemens Networks, Huawei, RITT, Samsung, TD-tech | Agreed |
R1‑081675 | Way forward on hashing function definition | LGE, Ericsson, Motorola, Qualcomm, Nokia, NSN, Samsung | Agreed |
R1‑081676 | LS on SI-1 transmission | RAN1, Ericsson | Agreed |
R1‑081677 | 36.213 CR0013 (Rel-8, F) UL HARQ Operation and Timing | Nokia, Nokia Siemens Networks | Revised |
R1‑081678 | 36.211 CR0007R1 (Rel-8, F) Correction of the predefined hopping pattern for PUSCH | Samsung | Revised |
R1‑081679 | On timing advance offsets for TDD and HD | Ericsson, Motorola | Noted |
R1‑081680 | LS on switch time requirements for LTE half duplex | RAN1, Ericsson | Agreed |
R1‑081681 | void | - | - |
R1‑081682 | Refinements on signalling of CQI/Precoding information on PDCCH | Ericsson, TI, NTT DoCoMo, NEC, Sharp | Not treated |
R1‑081683 | LS on information about new PDCCH Format 1C | RAN1, Ericsson | Agreed |
R1‑081684 | void | - | - |
R1‑081685 | 36.211 CR0012 (Rel-8, F) on Limiting the constellation size of ACK transmission when transmitted in PUSCH | Qualcomm Europe | Agreed |
R1‑081686 | 36.211 CR0007R2 (Rel-8, F) Correction of the predefined hopping pattern for PUSCH | Samsung | Agreed |
R1‑081687 | 36.213 CR0014 (Rel-8, F) on SRS Power Control | Motorola, NTT DoCoMo | Agreed |
R1‑081688 | LS on CQI reference period | RAN1, Panasonic | Agreed |
R1‑081689 | Block-Code for CQI on PUSCH | Marvell | Missing |
R1‑081690 | TR 25.825 v 0.1.0 on Dual-Cell HSDPA operation | Qualcomm Europe | Agreed |
R1‑081691 | 36.211 CR0011 (Rel-8, F) TDD PRACH configurations | ZTE | Agreed |
R1‑081692 | LS on UE capability for DRS | RAN1, CMCC | Agreed |
R1‑081693 | Physical Layer Parameters for CQI Reporting | Texas Instruments | Agreed |
R1‑081694 | LS on information about RAN1decision regarding downlink power settings | RAN1, Nokia | Agreed |
R1‑081695 | 36.211 CR0010R1 (Rel-8, F) on UL DM RS Hopping | Ericsson | Agreed |
R1‑081696 | LS on RAN1 decision regarding to the transmission of UL/DL allocation signal | RAN1, Nokia | Agreed |
R1‑081697 | 36.213 CR0006R1 (Rel-8, F) PUCCH power control for non-unicast information | Ericsson | Agreed |
R1‑081698 | LS on information about RAN1 assumptions regarding TPC-PDCCH | RAN1, Ericsson | Agreed |
R1‑081699 | 36.211 CR0009R1 (Rel-8, F) PUCCH format 1 | Qualcomm Europe | Agreed |
R1‑081700 | LS on transmission of UE specific RS in subframes #0 and #5 | RAN1, Qualcomm | Agreed |
R1‑081701 | Way forward for power headroom reporting | Ericsson, Nokia Siemens Network, Nokia, Qualcomm, Panasonic, Alcatel-Lucent | Agreed |
R1‑081702 | LS on E-AICH Power Offset and Error Targets for AICH/E-AICH | RAN1, Qualcomm Europe | Agreed |
R1‑081703 | 36.213 CR0013R1 (Rel-8, F) UL HARQ Operation and Timing | Nokia, Nokia Siemens Networks | Agreed |
R1‑081704 | LS on additional RSRP trigger for ICIC | RAN1, Ericsson | Agreed |
R1‑081705 | LS on Transport Block Size | RAN1, Motorola | Agreed |
R1‑081706 | Simulation Assumptions for DC HSDPA Performance Evaluations | Qualcomm Europe, Ericsson, Nokia, Nokia Siemens Networks | Agreed |
page generated from database: 2024-07-20 12:15:34