3GPP TDocs (written contributions) at meeting
Meeting: R1-70b - 2012-10-08 to 2012-10-12, San Diego
meeting id: R1-70b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑124045 | Draft Agenda for RAN1#70bis meeting | RAN1 Chairman | Approved |
R1‑124046 | Final Report from RAN1#70 | MCC | Approved |
R1‑124047 | Selected highlights from RAN#57 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑124048 | Reply LS on Multiflow Timing | RAN2, Huawei | Noted |
R1‑124049 | Reply LS on UE support of simultaneous transmission/reception for TDD inter-band CA | RAN2, CMCC | Noted |
R1‑124050 | Reply LS on specifying paging subframes of any UE with the cell-specific paging configuration | RAN2, Alcatel_Lucent | Noted |
R1‑124051 | LS on UTDOA | RAN2, Ericsson | Noted |
R1‑124052 | LS on GSMA Application Network Efficiency Task Force “whitepaper and actions” | RAN2, Qualcomm | Noted |
R1‑124053 | Reply LS on CSI-RSRP and CoMP Resource Management Set | RAN2, Huawei | Noted |
R1‑124054 | LS on RAN2 input about Rel-11 UE capabilities | RAN2, NTT DoCoMo | Noted |
R1‑124055 | LS on System Frame Number (SFN) Synchronization | RAN3, CMCC | Noted |
R1‑124056 | LS on LTE Rel-11 UE capabilities list | RAN4, NTT DoCoMo | Noted |
R1‑124057 | Response LS on MIB detection in FeICIC | RAN4, Huawei, Qualcomm | Noted |
R1‑124058 | Response LS on the impacts to UPH definition by UE architecture | RAN4, Huawei | Noted |
R1‑124059 | LS Response on Status on CA enhancement | RAN4, Ericsson | Noted |
R1‑124060 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method | RAN4, Nokia | Noted |
R1‑124061 | LS on GSMA Application Network Efficiency Task Force “whitepaper and actions” | RAN, Intel, Verizon Wireless | Noted |
R1‑124062 | Reply LS on RAN1/2/4 input about Rel-11 LTE UE capabilities | RAN, NTT DoCoMo | Noted |
R1‑124063 | LS on GSMA Application Network Efficiency Task Force “whitepaper and actions” | SA4, Ericsson | Noted |
R1‑124064 | LS on GSMA Application Network Efficiency Task Force “whitepaper and actions” | SA5, Alcatel-Lucent | Noted |
R1‑124065 | Discussion on avoidance of collisions between CSI-RS and paging subframes on Scell | Huawei, HiSilicon | Noted |
R1‑124066 | 36.212 CR0140 (Rel-10, F) Correction on bit sequence for channel coding of RI on PUCCH | Huawei, HiSilicon | Agreed |
R1‑124067 | Open issues for simultaneous transmission of periodic CSI and HARQ-ACK on PUCCH format 3 | Huawei, HiSilicon | Noted |
R1‑124068 | Remaining issues for inter-band TDD CA with different UL-DL configurations | Huawei, HiSilicon | Revised |
R1‑124069 | Details of aperiodic CSI feedback for CoMP | Huawei, HiSilicon | Noted |
R1‑124070 | Downlink control signaling for CoMP PDSCH | Huawei, HiSilicon | Noted |
R1‑124071 | Remaining issues for antenna ports quasi-collocation | Huawei, HiSilicon | Not treated |
R1‑124072 | UE processing aspects of CSI feedback | Huawei, HiSilicon | Noted |
R1‑124073 | Discussion on IMR collision randomization | Huawei, HiSilicon | Noted |
R1‑124074 | Discussion on Pc for CoMP operation | Huawei, HiSilicon | Noted |
R1‑124075 | Details of transmission mode 10 | Huawei, HiSilicon | Not treated |
R1‑124076 | Mapping of ECCE to EREG for localized and distributed transmission | Huawei, HiSilicon | Revised |
R1‑124077 | Finalization of EREG definition | Huawei, HiSilicon | Noted |
R1‑124078 | Search space design for EPDCCH | Huawei, HiSilicon | Noted |
R1‑124079 | Fallback operation for EPDCCH | Huawei, HiSilicon | Not treated |
R1‑124080 | Remaining details of EPDCCH/PDSCH start symbol configuration | Huawei, HiSilicon | Not treated |
R1‑124081 | Antenna port association for EPDCCH | Huawei, HiSilicon | Not treated |
R1‑124082 | PUCCH ACK/NACK resource determination for EPDCCH | Huawei, HiSilicon | Noted |
R1‑124083 | Discussion on Rel-11 LTE UE capability | Huawei, HiSilicon | Not treated |
R1‑124084 | Editor's document for the 36.212 specification for rel-11 | Huawei | Noted |
R1‑124085 | 36.212 CR0141 (Rel-10, F) Correction on the definition of KMIMO | CATT | Withdrawn |
R1‑124086 | 36.213 CR0390 (Rel-10, F) Correction on TDD PUCCH format 1b with channel selection for carrier aggregation | CATT, Ericsson, ST-Ericsson, Samsung, Panasonic, ZTE, Qualcomm | Noted |
R1‑124087 | Periodic CSI and HARQ-ACK multiplexing with PUCCH format 3 configured in Rel-11 | CATT | Not treated |
R1‑124088 | SORTD of PUCCH format 1b with channel selection for single cell | CATT | Noted |
R1‑124089 | Half duplex operations for TDD inter-band CA | CATT | Not treated |
R1‑124090 | PDSCH HARQ timing for cross-carrier scheduling with TDD inter-band carrier aggregation | CATT | Not treated |
R1‑124091 | HARQ-ACK feedback for TDD inter-band CA | CATT | Noted |
R1‑124092 | Soft buffer partitioning for TDD inter-band CA with different UL-DL configurations | CATT | Noted |
R1‑124093 | SRS transmission with multiple timing advances in Rel-11 | CATT | Not treated |
R1‑124094 | On control signaling for CoMP | CATT | Not treated |
R1‑124095 | On limiting UE complexity for CoMP CSI processing | CATT | Noted |
R1‑124096 | On common RI/subband among CSI processes | CATT | Not treated |
R1‑124097 | CSI multiplexing of multiple processes for CoMP | CATT | Not treated |
R1‑124098 | Discussion on CQI for non-PMI/RI reporting in CoMP and TP for 36.213 | CATT | Not treated |
R1‑124099 | Discussion on VCID for PUSCH DMRS and TP for 36.211 | CATT | Not treated |
R1‑124100 | RE mapping for E-CCE/EREG | CATT | Noted |
R1‑124101 | Search space design for E-PDCCH | CATT | Noted |
R1‑124102 | E-PDCCH set configuration | CATT | Noted |
R1‑124103 | E-PDCCH starting symbol configuration | CATT | Noted |
R1‑124104 | Configuration of subframes for E-PDCCH | CATT | Not treated |
R1‑124105 | DMRS association issues for E-PDCCH | CATT | Not treated |
R1‑124106 | DMRS scrambling sequence for E-PDCCH | CATT | Not treated |
R1‑124107 | PUCCH resource for E-PDCCH | CATT | Not treated |
R1‑124108 | Discussion on Rel-11 TS36.213 | CATT | Noted |
R1‑124109 | Discussion on Rel-11 UE capabilities and feature groups | CATT | Not treated |
R1‑124110 | Remaining details of Multi-cell HARQ-ACK and Periodic CSI Multiplexing for PUCCH format 3 | Intel Corporation | Noted |
R1‑124111 | SORTD for PUCCH format 1b with Channel Selection in Single Configured Cell | Intel Corporation | Not treated |
R1‑124112 | Remaining issues on PUCCH Format 1b with CS design for inter-band CA | Intel Corporation | Revised |
R1‑124113 | Discussion on number of DL HARQ processes for inter-band CA | Intel Corporation | Not treated |
R1‑124114 | Further consideration on the UL cross-carrier scheduling/HARQ timing for inter-band TDD CA | Intel Corporation | Not treated |
R1‑124115 | Remaining details of RS quasi co-location signaling | Intel Corporation | Noted |
R1‑124116 | Remaining details of periodic CSI reporting for DL CoMP | Intel Corporation | Not treated |
R1‑124117 | Discussion on the enhancements for interference measurements | Intel Corporation | Noted |
R1‑124118 | Signalling details of PDSCH RE mapping and aperiodic CSI triggering | Intel Corporation | Not treated |
R1‑124119 | Remaining details of search space equations | Intel Corporation | Noted |
R1‑124120 | Remaining details of AP association | Intel Corporation | Not treated |
R1‑124121 | EPDCCH scrambling sequence generation | Intel Corporation | Not treated |
R1‑124122 | PUCCH resource allocation | Intel Corporation | Not treated |
R1‑124123 | Remaining issues of Non-CA based FeICIC | Fujitsu | Noted |
R1‑124124 | DCI format to support CoMP in TM10 | Fujitsu | Noted |
R1‑124125 | Email discussion [69-11]: FFS aspects of aperiodic CSI feedback for CoMP | Fujitsu | Not treated |
R1‑124126 | Aperiodic CSI feedback triggering and reporting for CoMP | Fujitsu | Not treated |
R1‑124127 | DL CoMP relevant text inclusion in TS36.300 | Fujitsu | Not treated |
R1‑124128 | Evaluation of ePDCCH search space working assumptions | Fujitsu | Noted |
R1‑124129 | Search space configuration for localized ePDCCH | Fujitsu | Not treated |
R1‑124130 | Search space configuration for distributed ePDCCH | Fujitsu | Not treated |
R1‑124131 | Port association for distributed ePDCCH | Fujitsu | Not treated |
R1‑124132 | UE behaviour with large transport blocks | Fujitsu | Not treated |
R1‑124133 | Finalizing details of periodic CSI and HARQ-ACK on PUCCH Format 3 | Texas Instruments | Not treated |
R1‑124134 | Remaining issues on transmit diversity for PUCCH Format 1b with channel selection | Texas Instruments | Noted |
R1‑124135 | Need for rate matching around CRS of neighbor cells | Texas Instruments | Withdrawn |
R1‑124136 | Remaining issues on control signaling for DL CoMP | Texas Instruments | Noted |
R1‑124137 | Other configuration aspects for CoMP | Texas Instruments | Noted |
R1‑124138 | Periodic PUCCH feedback for CoMP | Texas Instruments | Not treated |
R1‑124139 | Aperiodic feedback for CoMP | Texas Instruments | Not treated |
R1‑124140 | Scrambling sequence initialization of DMRS for ePDCCH | Texas Instruments | Revised |
R1‑124141 | Outstanding aspects of PUCCH resource allocation for EPDCCH | Texas Instruments | Not treated |
R1‑124142 | Power control for Periodic CSI and Multi-cell HARQ-ACK Multiplexing for PUCCH format 3 | Ericsson, ST-Ericsson | Not treated |
R1‑124143 | Further details of Periodic CSI and Multi-cell HARQ-ACK Multiplexing for PUCCH format 3 | Ericsson, ST-Ericsson | Noted |
R1‑124144 | On Power control for PUCCH format 1b with Channel Selection | Ericsson, ST-Ericsson | Not treated |
R1‑124145 | Remaining issues with HARQ-ACK transmission in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Noted |
R1‑124146 | Half-duplex operations support with aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑124147 | Soft buffer operations in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑124148 | Remaining details of MTA | Ericsson, ST-Ericsson | Not treated |
R1‑124149 | Mapping of ePDCCH to RE | Ericsson, ST-Ericsson | Not treated |
R1‑124150 | ePDCCH search space | Ericsson, ST-Ericsson | Noted |
R1‑124151 | ePDCCH resource configuration | Ericsson, ST-Ericsson | Noted |
R1‑124152 | ePDCCH start symbol configuration | Ericsson, ST-Ericsson | Noted |
R1‑124153 | ePDCCH subframe configuration | Ericsson, ST-Ericsson | Noted |
R1‑124154 | ePDCCH antenna port configuration | Ericsson, ST-Ericsson | Not treated |
R1‑124155 | ePDCCH DMRS scrambling initialization | Ericsson, ST-Ericsson | Noted |
R1‑124156 | PUCCH resource allocation for ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑124157 | DCI formats supported on ePDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑124158 | The issue of large transport blocks when scheduled by ePDCCH | Ericsson, ST-Ericsson | Not treated |
R1‑124159 | On resolving ePDCCH aggregation level ambiguity | Ericsson, ST-Ericsson | Not treated |
R1‑124160 | Way Forward on EPDCCH DMRS scrambling initialization | Huawei, HiSilicon, CATT, Intel, New Postcom, Hitachi | Noted |
R1‑124161 | Updated analysis of EPDCCH search complexity and related simpification | Huawei, HiSilicon | Not treated |
R1‑124162 | EPDCCH resource allocation | Huawei, HiSilicon | Not treated |
R1‑124163 | Details of multiplexing for aperiodic CSI feedback | Huawei, HiSilicon | Noted |
R1‑124164 | Remaining details of transmit diversity for PUCCH Format 1b with channel selection | Huawei, HiSilicon | Not treated |
R1‑124165 | Details of CSI multiplexing and compression for periodic CSI feedback | Huawei, HiSilicon | Not treated |
R1‑124166 | On the restriction of the maximum TB size with EPDCCH | Huawei, HiSilicon | Not treated |
R1‑124167 | DCI formats supported on EPDCCH | Huawei, HiSilicon | Not treated |
R1‑124168 | Assessment of uplink solution candidates for CB-ICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑124169 | Downlink interference mitigation for HetNet CB-ICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑124170 | Operational Carrier Selection for CB-ICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑124171 | Discussion on UE measurements for the two-stage MIMO OTA test method | Nokia, Nokia Siemens Networks | Noted |
R1‑124172 | Remaining details on Multi-cell HARQ-ACK and Periodic CSI multiplexing for PUCCH Format 3 | Nokia Siemens Networks, Nokia | Not treated |
R1‑124173 | On remaining details of SORTD for PUCCH Format 1b with Channel Selection in the single cell case | Nokia Siemens Networks, Nokia | Not treated |
R1‑124174 | Half duplex operation with inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Not treated |
R1‑124175 | Handling of UL DAI with inter-band TDD CA | Nokia Siemens Networks, Nokia | Not treated |
R1‑124176 | Remaining issues of the HARQ/scheduling timing for PUSCH with cross-carrier scheduling for inter-band TDD CA | Nokia Siemens Networks, Nokia | Not treated |
R1‑124177 | Remaining Issues on Multiple Timing Advance | Nokia Siemens Networks, Nokia | Not treated |
R1‑124178 | Need for signaling quasi co-location between CRS and CSI-RS | Nokia Siemens Networks, Nokia | Noted |
R1‑124179 | Remaining details of downlink control signaling design for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑124180 | CSI feedback design to support CA and CoMP simultaneously | Nokia Siemens Networks, Nokia | Not treated |
R1‑124181 | Need for partially overlapping IMRs for Rel-11 | Nokia Siemens Networks, Nokia | Noted |
R1‑124182 | On the common RI and subband constraints | Nokia Siemens Networks, Nokia | Noted |
R1‑124183 | eREG / eCCE definitions for EPDCCH | Nokia, Nokia Siemens Networks | Noted |
R1‑124184 | Remaining details on search spaces of EPDCCH | Nokia, Nokia Siemens Networks | Noted |
R1‑124185 | On the EPDCCH starting symbol configuration | Nokia, Nokia Siemens Networks | Revised |
R1‑124186 | Considerations on subframes in which to monitor EPDCCH | Nokia, Nokia Siemens Networks | Revised |
R1‑124187 | Association between DM-RS ports and EPDCCH transmission | Nokia, Nokia Siemens Networks | Not treated |
R1‑124188 | On DM-RS scrambling sequence initialization for EPDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑124189 | Remaining issues on HARQ-ACK resource allocation for data scheduled via EPDCCH: FDD aspects | Nokia Siemens Networks, Nokia | Not treated |
R1‑124190 | Remaining issues on HARQ-ACK resource allocation for data scheduled via EPDCCH: TDD aspects | Nokia Siemens Networks, Nokia | Not treated |
R1‑124191 | eCCE indexing in support of implicit HARQ-ACK resource allocation | Nokia Siemens Networks, Nokia | Noted |
R1‑124192 | On the details of DCI formats for ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑124193 | Remaining issues on quasi-co-located antenna ports | ZTE | Noted |
R1‑124194 | Downlink control signalling for CoMP | ZTE | Revised |
R1‑124195 | UE processing related aspects on CSI Feedback | ZTE | Not treated |
R1‑124196 | Remaining issues on configuration of CSI process and IMR | ZTE | Noted |
R1‑124197 | Periodic feedback for CoMP | ZTE | Not treated |
R1‑124198 | Aperiodic feedback for CoMP | ZTE | Not treated |
R1‑124199 | Remaining details of eCCE to eREG mapping | ZTE | Noted |
R1‑124200 | Discussion on ePDCCH resource set configuration | ZTE | Not treated |
R1‑124201 | Discussion on search space design | ZTE | Not treated |
R1‑124202 | Starting symbol configuration for ePDCCH | ZTE | Not treated |
R1‑124203 | Subframe configuration of monitoring ePDCCH | ZTE | Not treated |
R1‑124204 | On association between DM-RS ports and EPDCCH transmission | ZTE | Not treated |
R1‑124205 | PUCCH resource allocation for ePDCCH | ZTE | Not treated |
R1‑124206 | TrCH bits restriction for PDSCH scheduled by ePDCCH | ZTE | Not treated |
R1‑124207 | DCI formats supported on EPDCCH | ZTE | Not treated |
R1‑124208 | Discussion on DMRS scrambling sequence for enhanced PDCCH | ZTE | Noted |
R1‑124209 | Clarification of parallel reception of PDSCH on SCell and Msg 2 on Pcell | ZTE, Ericsson, ST-Ericsson | Noted |
R1‑124210 | Remaining details of Multi-cell HARQ-ACK and Periodic CSI Multiplexing for PUCCH format 3 | ZTE | Not treated |
R1‑124211 | Consideration on power control of Multi-cell HARQ-ACK and Periodic CSI Multiplexing | ZTE | Noted |
R1‑124212 | Remaining details of Transmit Diversity for PUCCH Format 1b with Channel Selection | ZTE | Noted |
R1‑124213 | On signalling assistance for CRE UE in feICIC | ZTE | Noted |
R1‑124214 | Parallel SRS transmission with MTA | ZTE | Not treated |
R1‑124215 | CoMP CSI periodic feedback | New Postcom | Not treated |
R1‑124216 | CoMP CSI aperiodic feedback | New Postcom | Not treated |
R1‑124217 | CSI constraints in Rel-11 | New Postcom | Not treated |
R1‑124218 | Discussion on quasi co-location assumptions for EPDCCH DMRS | New Postcom | Not treated |
R1‑124219 | Details on downlink CoMP control signalling | New Postcom | Revised |
R1‑124220 | Configuration of CSI-IM for CoMP | New Postcom | Noted |
R1‑124221 | Remaining issues on associating DMRS ports and EPDCCH transmission | New Postcom | Not treated |
R1‑124222 | Discussion on remaining issues of DMRS for EPDCCH | New Postcom | Not treated |
R1‑124223 | Remaining details of PUCCH resource allocation for EPDCCH | New Postcom | Not treated |
R1‑124224 | Configuration for monitoring EPDCCH | New Postcom | Not treated |
R1‑124225 | Discussion on restriction on maximum number of transport channel bits | New Postcom | Not treated |
R1‑124226 | Remaining details of eCCE and eREG design | New Postcom | Noted |
R1‑124227 | Configuration of the starting symbol for EPDCCH | New Postcom | Noted |
R1‑124228 | Remaining details of EPDCCH search space | New Postcom | Not treated |
R1‑124229 | Discussion on Pc configuration for CoMP | New Postcom | Not treated |
R1‑124230 | Number of DL HARQ processes for rate matching and IR buffer size calculation for different TDD UL-DL configurations | Panasonic | Noted |
R1‑124231 | Remainig issues on multiple TAGs | Panasonic | Not treated |
R1‑124232 | MCS Table Adaptation for Low Power ABS | Panasonic | Not treated |
R1‑124233 | Clarification on SFN and Subframe Boundary Alignment | Panasonic | Noted |
R1‑124234 | Text proposal on CoMP RS related correction | Panasonic | Not treated |
R1‑124235 | DCI Design for TM10 | Panasonic | Noted |
R1‑124236 | RI and Subband Index Constraints for Periodic CSI | Panasonic | Not treated |
R1‑124237 | RI and Subband Index Constraints for Aperiodic CSI | Panasonic | Noted |
R1‑124238 | eCCE/eREG to RE mapping for EPDCCH | Panasonic | Noted |
R1‑124239 | EPDCCH starting symbol | Panasonic | Not treated |
R1‑124240 | Configuration of subframes for monitoring EPDCCH | Panasonic | Not treated |
R1‑124241 | EPDCCH search space and aggregation levels | Panasonic | Revised |
R1‑124242 | Association between DM-RS port and EPDCCH transmission | Panasonic | Not treated |
R1‑124243 | Remaining issues on PUCCH resource allocation for EPDCCH | Panasonic | Noted |
R1‑124244 | EPDCCH-PUCCH resource allocation for TDD | Panasonic | Revised |
R1‑124245 | On Remaining Issues in E-PDCCH Search Sapce Design | Research In Motion UK Limited | Not treated |
R1‑124246 | PUCCH A/N Resource Mapping for MU-MIMO transmission of ePDCCH | Research In Motion UK Limited | Not treated |
R1‑124247 | On Remaining Details of Association between DMRS Port and E-PDCCH Transmission | Research In Motion UK Limited | Not treated |
R1‑124248 | Improved PUCCH Resource Allocation Efficiency for ePDCCH | Research In Motion UK Limited | Not treated |
R1‑124249 | Remaining Issues Regarding Multiple TA | NTT DOCOMO | Not treated |
R1‑124250 | Details of Aperiodic CSI Feedback for Rel-11 CoMP | NTT DOCOMO | Noted |
R1‑124251 | Downlink control signaling for Rel-11 CoMP | NTT DOCOMO | Noted |
R1‑124252 | Impact of restriction on CoMP CSI processing | NTT DOCOMO | Revised |
R1‑124253 | Enhanced Interference Measurement Mechanisms for Rel-11 | NTT DOCOMO | Noted |
R1‑124254 | Details Regarding ECCE/EREG-to-RE Mapping for EPDCCH^^ | NTT DOCOMO | Noted |
R1‑124255 | Views on Aggregation Level for EPDCCH | NTT DOCOMO | Not treated |
R1‑124256 | Search Space Design for Localized E-PDCCH Transmission | NTT DOCOMO | Revised |
R1‑124257 | Details Regarding Multiple EPDCCH Sets | NTT DOCOMO | Noted |
R1‑124258 | Views on PUCCH Resource Allocation for EPDCCH | NTT DOCOMO | Not treated |
R1‑124259 | Views on Restriction on Maximum Number of Transport Channel Bits | NTT DOCOMO | Not treated |
R1‑124260 | On remaining details of R11 PUCCH F3 AN and CSI multiplexing | InterDigital Communications, LLC | Withdrawn |
R1‑124261 | Details of aperiodic CSI triggering | InterDigital Communications, LLC | Noted |
R1‑124262 | Configurability of Pc | InterDigital Communications, LLC | Not treated |
R1‑124263 | Overlapping of CSI-IM resources | InterDigital Communications, LLC | Noted |
R1‑124264 | Remaining details of periodic CSI feedback | InterDigital Communications, LLC | Not treated |
R1‑124265 | Remaining details of eREG/eCCE definition | InterDigital Communications, LLC | Not treated |
R1‑124266 | Remaining details of EPDCCH search space design | InterDigital Communications, LLC | Noted |
R1‑124267 | Remaining details of antenna port association for EPDCCH | InterDigital Communications, LLC | Not treated |
R1‑124268 | Remaining issues on DM-RS for EPDCCH | InterDigital Communications, LLC | Not treated |
R1‑124269 | PUCCH resource allocation for EPDCCH based A/N | InterDigital Communications, LLC | Not treated |
R1‑124270 | DCI formats and Transmission Modes supported on EPDCCH | InterDigital Communications, LLC | Not treated |
R1‑124271 | Restriction of maximum TBS for EPDCCH | InterDigital Communications, LLC | Not treated |
R1‑124272 | Remaining details of EPDCCH resource definition | InterDigital Communications, LLC | Noted |
R1‑124273 | DMRS scrambling sequence for ePDCCH | Hitachi Ltd. | Not treated |
R1‑124274 | Discussion on reference CSI components for CoMP | Hitachi Ltd. | Not treated |
R1‑124275 | Number of Interference Measurement Resources for CoMP | Hitachi Ltd. | Not treated |
R1‑124276 | Scoping the UMTS HetNet Study | Research In Motion UK Limited | Noted |
R1‑124277 | Remaining details of control signalling for DL CoMP | MediaTek Inc. | Not treated |
R1‑124278 | UE processing requirement for supporting DL CoMP | MediaTek Inc. | Not treated |
R1‑124279 | On reference and subband/RI constrained CSI process | MediaTek Inc. | Noted |
R1‑124280 | CSI multiplexing and collision handling in periodic feedback | MediaTek Inc. | Not treated |
R1‑124281 | eREG to RE mapping for ePDCCH | MediaTek Inc. | Not treated |
R1‑124282 | Search space design and aggregation levels supported in ePDCCH | MediaTek Inc. | Not treated |
R1‑124283 | On the necessity of ePDCCH starting symbol configuration | MediaTek Inc. | Not treated |
R1‑124284 | Remaining aspects of PUCCH resource allocation for ePDCCH | MediaTek Inc. | Not treated |
R1‑124285 | Views on methods of transport block size restriction | MediaTek Inc. | Not treated |
R1‑124286 | Discussion on duplicated description of codebook sub-sampling | NEC Group | Noted |
R1‑124287 | Draft CR on Clarification of codebook subsampling for PUCCH 2-1 to the duplicated description | NEC Group | Noted - Revised |
R1‑124288 | On MIB message detection via higher layer signaling | NEC Group | Noted |
R1‑124289 | Details of Aperiodic CSI Triggering | NEC Group | Not treated |
R1‑124290 | Maximum number of CSI processes | NEC Group | Not treated |
R1‑124291 | Configuration of CSI processes | NEC Group | Not treated |
R1‑124292 | Views on enhanced IMR configuration | NEC Group | Noted |
R1‑124293 | ePDCCH PRB configuration | NEC Group | Not treated |
R1‑124294 | ePDCCH search space design | NEC Group | Not treated |
R1‑124295 | On PDSCH RE mapping for CoMP | NEC Group | Noted |
R1‑124296 | ePDCCH with JT/DPS CoMP | NEC Group | Not treated |
R1‑124297 | Considerations on UE capability and feature group for common channel interference handling in FeICIC | NEC Group | Noted |
R1‑124298 | Remaining details of PUCCH 1b with channel selection in TDD inter band CA | Potevio | Not treated |
R1‑124299 | Remaining details of PUSCH timing in TDD inter band CA | Potevio | Not treated |
R1‑124300 | Remaining details of PUCCH resource allocation for EPDCCH | Potevio | Not treated |
R1‑124301 | Remaining details on PUCCH format 1b with channel selection for TDD CA with different TDD UL-DL configuration | Pantech | Revised |
R1‑124302 | On half duplex UE operation for TDD CA with different TDD UL-DL configuration | Pantech | Not treated |
R1‑124303 | Simultaneous SRS transmission in multiple TA | Pantech | Not treated |
R1‑124304 | Downlink control signaling for PDSCH RE mapping of DL CoMP | Pantech | Not treated |
R1‑124305 | CSI request filed of aperiodic feedback for DL CoMP | Pantech | Not treated |
R1‑124306 | Remaining issues on interference measurement resources in Rel-11 | Pantech | Noted |
R1‑124307 | ePDCCH monitoring subframe and search space configuration | Pantech | Not treated |
R1‑124308 | Draft CR for correction to input sequence for PUCCH format 3 | LG Electronics | Noted |
R1‑124309 | Remaining issues of multi-cell and periodic CSI on PUCCH format | LG Electronics | Noted |
R1‑124310 | Remaining issues of TxD for PUCCH format 1b with Channel Selection | LG Electronics | Not treated |
R1‑124311 | Remaining issues on ACK/NACK feedback for TDD CA with different UL-DL configurations | LG Electronics | Noted |
R1‑124312 | Remaining issues on half-duplex based CA with different TDD UL-DL configurations | LG Electronics | Not treated |
R1‑124313 | Issues on DL HARQ process in case of TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑124314 | Remaining RAN1 issues on multiple TA | LG Electronics | Not treated |
R1‑124315 | Remaining issues for feICIC WI | LG Electronics | Noted |
R1‑124316 | Signaling for quasi co-location assumptions and PDSCH rate matching | LG Electronics | Not treated |
R1‑124317 | Remaining details on signaling for DL CoMP | LG Electronics | Not treated |
R1‑124318 | Consideration on UE processing relaxation | LG Electronics | Not treated |
R1‑124319 | Consideration on dependency among CoMP CSIs | LG Electronics | Noted |
R1‑124320 | Remaining details of ECCE and EREG resource mapping | LG Electronics | Revised |
R1‑124321 | On EPDCCH Candidates and Aggregation Levels | LG Electronics | Not treated |
R1‑124322 | Details of EPDCCH set configuration | LG Electronics | Noted |
R1‑124323 | Principles of EPDCCH starting symbol configuration | LG Electronics | Not treated |
R1‑124324 | On subframe monitoring operation for EPDCCH | LG Electronics | Not treated |
R1‑124325 | Details of association between DMRS ports and EPDCCH transmission | LG Electronics | Revised |
R1‑124326 | Remaining details of DMRS for EPDCCH | LG Electronics | Not treated |
R1‑124327 | Remaining details of PUCCH resource allocation for EPDCCH | LG Electronics | Not treated |
R1‑124328 | Consideration on DCI formats supported by EPDCCH | LG Electronics | Not treated |
R1‑124329 | Discussion on TBS restriction and UE behaviour | LG Electronics | Not treated |
R1‑124330 | On supporting ICIC of EPDCCH | LG Electronics | Not treated |
R1‑124331 | TBS determination for PDSCH scheduled by EPDCCH | LG Electronics | Not treated |
R1‑124332 | Introduction of no PHICH monitoring operation | LG Electronics | Not treated |
R1‑124333 | PDSCH RE mapping and quasi-collocation signaling for CoMP | ETRI | Not treated |
R1‑124334 | Single cell reporting cases of PUCCH Format 1b with channel selection for TDD inter-band CA | Sharp | Not treated |
R1‑124335 | TPC accumulation for multiple TA and Text Proposal | Sharp | Not treated |
R1‑124336 | Details of EREG and ECCE structures | Sharp | Noted |
R1‑124337 | Details of association between DM-RS ports and EPDCCH | Sharp | Not treated |
R1‑124338 | Remaining aspects of PUCCH resource for EPDCCH | Sharp | Not treated |
R1‑124339 | On periodic CSI report for inter-band TDD CA | Intel Corporation | Not treated |
R1‑124340 | Remaining details of DCI formats supported on EPDCCH | New Postcom | Not treated |
R1‑124341 | Discussion on CP length | New Postcom | Not treated |
R1‑124342 | Discussion on Remaining MIB issues | New Postcom | Noted |
R1‑124343 | Consideration on CSI-RS configuration on Paging subframes | New Postcom | Noted |
R1‑124344 | Configuration of CSI process | New Postcom | Not treated |
R1‑124345 | Remaining issues for Multi-cell HARQ-ACK and Periodic CSI Multiplexing on PUCCH format 3 | New Postcom | Not treated |
R1‑124346 | HARQ-ACK bundling issues for CA enhancement | New Postcom | Not treated |
R1‑124347 | Half duplex operation for determining the transimssion direction of overlapped subframes for inter-band CA | New Postcom | Not treated |
R1‑124348 | Parallel transmissions of SRS+SRS in different TAGs | HTC | Revised |
R1‑124349 | Impact on UE interference estimation due to overlapping IMR | HTC | Revised |
R1‑124350 | Reusing PUCCH format 3 to multiplex CSI reports for DL CoMP | HTC, ITRI | Not treated |
R1‑124351 | Threshold Value for EPDCCH Search Space | HTC | Not treated |
R1‑124352 | Discussion on EPDCCH Sets and Number of EPDCCH Decoding Candidates | HTC | Not treated |
R1‑124353 | Discussion on EPDCCH Search Space Design | HTC | Revised |
R1‑124354 | Configuration of starting symbol for EPDCCH | HTC | Not treated |
R1‑124355 | Discussion on EPDCCH Antenna Port Association | HTC | Revised |
R1‑124356 | Remaining issues on PUCCH A/N resource allocation for EPDCCH | HTC | Not treated |
R1‑124357 | Restriction on Maximum Number of TrCH Bits | HTC | Not treated |
R1‑124358 | Rel-11 LTE UE capabilities and FGI | HTC | Not treated |
R1‑124359 | HARQ-ACK and Periodic CSI Multiplexing using PUCCH Format 3 | Samsung | Not treated |
R1‑124360 | Discussion on the maximum number of aggregated cells | Samsung | Not treated |
R1‑124361 | Soft buffer handling for TDD inter-band CA | Samsung | Not treated |
R1‑124362 | HARQ timing for PUSCH Case D on scheduled Scell | Samsung | Not treated |
R1‑124363 | Remaining issues on L1 parameters for DL CoMP | Samsung | Not treated |
R1‑124364 | DL control signaling for CoMP | Samsung | Noted |
R1‑124365 | Aperiodic CSI triggering for CoMP | Samsung | Not treated |
R1‑124366 | Remaining issues on quasi-co-location between CSI-RS, CRS and DMRS | Samsung | Revised |
R1‑124367 | Maximum number of CSI processes and IMRs | Samsung | Not treated |
R1‑124368 | Discussion on reduction of CSI processing complexity to support CoMP | Samsung | Not treated |
R1‑124369 | Zero Power CSI RS and IMR configuration | Samsung | Not treated |
R1‑124370 | Remaining issues on interference measurement resources | Samsung | Noted |
R1‑124371 | Remaining issues on configuration of CSI processes | Samsung | Not treated |
R1‑124372 | Performance aspects on common RI/PMI feedback | Samsung | Not treated |
R1‑124373 | Further details of reference process configuration and CSI multiplexing | Samsung | Not treated |
R1‑124374 | Remaining RRC Signaling for EPDCCH | Samsung | Not treated |
R1‑124375 | ECCE Structure and Indexing | Samsung | Not treated |
R1‑124376 | Design Aspects for EPDCCH Sets | Samsung | Noted |
R1‑124377 | ECCE Aggregation Levels and RE Threshold in a PRB Pair | Samsung | Noted |
R1‑124378 | Search Space Design for EPDCCH | Samsung | Noted |
R1‑124379 | EPDCCH Starting Subframe Symbol | Samsung | Noted |
R1‑124380 | Monitoring of EPDCCH Types and EPDCCH Subframes | Samsung | Not treated |
R1‑124381 | Association between DMRS port and ePDCCH | Samsung | Not treated |
R1‑124382 | Remaining DMRS Aspects for EPDCCH | Samsung | Not treated |
R1‑124383 | PUCCH Format 1a/1b Resources in Response to EPDCCH Detections | Samsung | Noted |
R1‑124384 | PUCCH resource allocation for TDD EPDCCH | Samsung | Not treated |
R1‑124385 | DCI Formats for EPDCCH | Samsung | Not treated |
R1‑124386 | Restricting Maximum Number of TrCH Bits for EPDCCH Scheduling | Samsung | Not treated |
R1‑124387 | UE capabilities for Rel-11 features | Samsung | Not treated |
R1‑124388 | Discussion on Heterogeneous Networks Scenarios and Simulation Assumptions | Renesas Mobile Europe Ltd | Noted |
R1‑124389 | DL HARQ Process Number for CC Specific TDD Configuration | Renesas Mobile Europe Ltd | Noted |
R1‑124390 | Leftover Issues for half duplex mode of CC specific TDD Configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑124391 | Remaining issues on quasi-colocated antenna ports | Renesas Mobile Europe Ltd | Noted |
R1‑124392 | Details of CRS rate matching and quasi-colocation signaling | Renesas Mobile Europe Ltd | Not treated |
R1‑124393 | UE processing aspects of CSI feedback | Renesas Mobile Europe Ltd | Not treated |
R1‑124394 | On the need for rank and subband constraints between CSI processes | Renesas Mobile Europe Ltd | Not treated |
R1‑124395 | On CQI definition | Renesas Mobile Europe Ltd | Not treated |
R1‑124396 | Remaining details of EPDCCH resource mapping | Renesas Mobile Europe Ltd | Not treated |
R1‑124397 | EPDCCH search space design details | Renesas Mobile Europe Ltd | Not treated |
R1‑124398 | Scrambling sequences for EPDCCH DMRS | Renesas Mobile Europe Ltd | Not treated |
R1‑124399 | UE capabilities for Rel-11 | Renesas Mobile Europe Ltd | Not treated |
R1‑124400 | Compression-based Periodic CSI Reporting for CoMP | ITRI | Not treated |
R1‑124401 | Aperiodic Feedback Triggering for CoMP Operations | ITRI | Not treated |
R1‑124402 | Discussions on half-duplex UE for TDD inter-band CA with different UL-DL configurations | ITRI | Not treated |
R1‑124403 | Paging subframes on SCells | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124404 | Scenarios and Assumptions for Study on UMTS Heterogeneous Networks | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124405 | Remaining details of Multi-cell HARQ-ACK and Periodic CSI Multiplexing for PUCCH format 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑124406 | Transmit Diversity for PUCCH Format 1b with Channel Selection for TDD Single Cell Case | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124407 | Remaining issues on support of different TDD UL-DL configurations on different bands | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑124408 | Remaining details of Downlink Control Signalling for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124409 | Remaining aspects of Quasi-co-located Antenna Ports | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑124410 | DCI-based triggering for aperiodic CSI feedback for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124411 | The constraints on CSI processes for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑124412 | Remaining issues on IMR Configuration and CQI for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | Noted |
R1‑124413 | RI determination for CSI processes in CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124414 | CSI feedback modes for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | Not treated |
R1‑124415 | Multiplexing and Compression of Periodic CSI Feedback for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑124416 | UCI Multiplexing on PUSCH for DL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑124417 | Remaining details of ECCE/EREG to RE mapping for EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124418 | Remaining Details of Search Space and Aggregation Levels | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑124419 | The start symbol configuration for EPDCCH/PDSCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124420 | Configuration of subframes for monitoring EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124421 | Remaining details of association between DM-RS ports and ePDCCH transmissions | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑124422 | Other remaining aspects of DM-RS for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑124423 | Remaining details of PUCCH resource allocation for EPDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑124424 | Considerations on restricting the maximum number of TrCH bits for EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑124425 | Search Space Design for Localized ePDCCH | CMCC | Noted |
R1‑124426 | Discussion on PDSCH RE mapping | CMCC | Not treated |
R1‑124427 | Discussion on rank and subband constraints between CSI Processes | CMCC | Not treated |
R1‑124428 | Discussion on Limiting UE Complexity for CoMP CSI Processing | CMCC | Not treated |
R1‑124429 | Discussion of scheduling and HARQ timing for cross-carrier scheduling of PUSCH | CMCC | Not treated |
R1‑124430 | Discussion on UE capabilities and feature groups for Rel-11 | CMCC | Not treated |
R1‑124431 | Remaining detail of support different TDD UL-DL configuration on different bands | ZTE | Not treated |
R1‑124432 | Views on ePDCCH sets | China Unicom | Not treated |
R1‑124433 | Avoiding excess DTX bits in channel selection for TDD inter-band CA | Research In Motion UK Limited | Revised |
R1‑124434 | ICIC consideration for EPDCCH | Research In Motion UK Limited | Not treated |
R1‑124435 | Fall Back Transmission for Downlink CoMP | Research In Motion UK Limited | Not treated |
R1‑124436 | CSI Multiplexing with HARQ-ACK | Qualcomm Inc. | Noted |
R1‑124437 | Support of CA for different TDD UL-DL configurations | Qualcomm Inc. | Not treated |
R1‑124438 | Power control aspects of multiple TA operation | Qualcomm Inc. | Not treated |
R1‑124439 | MIB acquisition for pico CRE UEs | Qualcomm Inc. | Noted |
R1‑124440 | SIB-1 signalling solutions | Qualcomm Inc. | Not treated |
R1‑124441 | Remaining signaling details for DL CoMP | Qualcomm Inc. | Not treated |
R1‑124442 | CSI processing relaxations for DL CoMP | Qualcomm Inc., NTT DOCOMO | Not treated |
R1‑124443 | Remaining details of CSI configuration aspects | Qualcomm Inc. | Noted |
R1‑124444 | Periodic CSI feedback reporting for DL CoMP | Qualcomm Inc. | Not treated |
R1‑124445 | Aperiodic CSI feedback reporting for DL CoMP | Qualcomm Inc. | Not treated |
R1‑124446 | eNB frequency accuracy for CoMP | Qualcomm Inc. | Not treated |
R1‑124447 | Remaining details of RE mapping for EPDCCH | Qualcomm Inc. | Not treated |
R1‑124448 | Remaining details of search space and aggregation levels | Qualcomm Inc. | Not treated |
R1‑124449 | Starting symbol configuration for ePDCCH | Qualcomm Inc. | Noted |
R1‑124450 | Configuration of subframes for monitoring ePDCCH | Qualcomm Inc. | Not treated |
R1‑124451 | Remaining details of association between DM-RS ports and EPDCCH transmission | Qualcomm Inc. | Revised |
R1‑124452 | Remaining aspects of DM-RS for EPDCCH | Qualcomm Inc. | Revised |
R1‑124453 | PUCCH resource allocation for EPDCCH | Qualcomm Inc. | Not treated |
R1‑124454 | Restriction of maximum TrCh bits | Qualcomm Inc. | Not treated |
R1‑124455 | Considerations of UE capabilities for Rel-11 | Qualcomm Inc. | Noted |
R1‑124456 | Remaining details of eCCE and eREG mapping for EPDCCH | Motorola Mobility | Not treated |
R1‑124457 | Blind Decoding and Search Space configuration for EPDCCH | Motorola Mobility | Noted |
R1‑124458 | RRC Signalling for EPDCCH | Motorola Mobility | Noted |
R1‑124459 | Handling of DCI formats with EPDCCH | Motorola Mobility | Not treated |
R1‑124460 | TrCH restriction for EPDCCH | Motorola Mobility | Not treated |
R1‑124461 | Summary of open issues from 36.213 CR drafting discussion | Motorola Mobility | Noted |
R1‑124462 | 25.212 CR0315 (Rel-10, F) Clarification of HS-SCCH order for MC-HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑124463 | 25.212 CR0316 (Rel-11, A) Clarification of HS-SCCH order for MC-HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑124464 | 25.214 CR0692 (Rel-11, F) Clarification of UE procedure for receiving HS-SCCH orders in the CELL_DCH state | Huawei, HiSilicon | Agreed |
R1‑124465 | Offset table design for E-ROCH | Huawei, HiSilicon | Noted |
R1‑124466 | Remaining issues of UL 64QAM | Huawei, HiSilicon | Noted |
R1‑124467 | Overview of UMTS Heterogeneous Networks | Huawei, HiSilicon | Noted |
R1‑124468 | Evaluation Methodology for UMTS Heterogeneous Networks | Huawei, HiSilicon | Noted |
R1‑124469 | Initial Simulation Results for Heterogeneous Networks | Huawei, HiSilicon | Noted |
R1‑124470 | Work Plan for Study on UMTS Heterogeneous Networks | Huawei, HiSilicon | Noted |
R1‑124471 | Skeleton of UMTS Heterogeneous Networks Technical Report | Huawei, HiSilicon | Noted - Revised |
R1‑124472 | Discussion on the power error ramping issue in uplink | Huawei, HiSilicon | Revised |
R1‑124473 | Remaining details of subframe configuration of monitoring EPDCCH | Huawei, HiSilicon | Not treated |
R1‑124474 | 25.224 Draft CR(R8)-Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | New PostCom | Withdrawn |
R1‑124475 | 25.224 Draft CR(R9)-Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | New PostCom | Withdrawn |
R1‑124476 | 25.224 Draft CR(R10)-Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | New PostCom | Withdrawn |
R1‑124477 | 25.224 Draft CR(R11)-Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | New PostCom | Withdrawn |
R1‑124478 | Maximun number of DL HARQ processes for TDD inter-band CA with different UL-DL configurations | ITRI | Noted |
R1‑124479 | Views on Rel-11 UE capability | NTT DOCOMO | Not treated |
R1‑124480 | Maximum number of HARQ processes in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑124481 | Consideration on the number of CSI processes for CoMP | China Unicom | Not treated |
R1‑124482 | Discussion on periodic CSI feedback mode for CoMP | China Unicom | Not treated |
R1‑124483 | 25.211CR0300 (Rel-11, F) Correction to the Multiflow non-time reference cell definition | Nokia Siemens Networks | Noted |
R1‑124484 | 25.214 CR0693 (Rel-11, F) Correction to the Multiflow non-time reference cell definition | Nokia Siemens Networks | Noted |
R1‑124485 | 25.214 CR0694 (Rel-11, F) Multiflow Out-of-sync handling | Nokia Siemens Networks | Not treated |
R1‑124486 | Email Discussion [70-52] Summary on ΔT2TP and βed ranges | Nokia Siemens Networks | Noted |
R1‑124487 | E-DPDCH Gain Factors Design for 8PAM | Nokia Siemens Networks | Noted |
R1‑124488 | ΔT2TP Range Extension and E-DPCCH Gain Factor Design for UL MIMO and 8PAM | Nokia Siemens Networks | Noted |
R1‑124489 | E-ROCH S-ETFC Offset Signalling range | Nokia Siemens Networks | Noted |
R1‑124490 | 25.211 CR0296r2 (Rel-11,B), Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Noted - Revised |
R1‑124491 | 25.212 CR0312r2 (Rel-11, B), Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Noted - Revised |
R1‑124492 | 25.213 CR0115r3 (Rel-11, B) Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Noted - Revised |
R1‑124493 | 25.214 CR0688r2 (Rel-11, B), Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Noted - Revised |
R1‑124494 | Considerations on evaluation scenarios for UMTS HetNet | Nokia Siemens Networks | Noted |
R1‑124495 | Simulation assumptions and initial results for UMTS HetNet | Nokia Siemens Networks | Noted |
R1‑124496 | Collision between RACH transmission and HARQ-ACK repetition | Ericsson, Nokia, Nokia Siemens Networks, Panasonic, Renesas Mobile Europe Ltd, Research In Motion UK Limited, ST-Ericsson | Noted |
R1‑124497 | HS-DPCCH Design for Type B Reporting in Four Branch MIMO System | Ericsson | Noted |
R1‑124498 | Remaining Issues in HS-DPCCH Design for Single Carrier for Four Branch MIMO System | Ericsson | Noted |
R1‑124499 | UL-Feedback Channel Design for Four branch MIMO System with Two Carriers | Ericsson | Noted |
R1‑124500 | UL-Feedback Channel Design for Four branch MIMO System with Three Carriers | Ericsson | Noted |
R1‑124501 | UL-Feedback Channel Design for Four branch MIMO System with Four Carriers | Ericsson | Noted |
R1‑124502 | Transmission and Reception Procedures with DTX codeword in a Four branch MIMO System | Ericsson | Noted |
R1‑124503 | Codebook Subset Restriction in Four Branch MIMO System | Ericsson | Noted |
R1‑124504 | Common HS-SCCH Orders in Four Branch MIMO System | Ericsson | Noted |
R1‑124505 | 25.211 CR0297R1 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.211 | Ericsson | Revised |
R1‑124506 | 25.212 CR0313R1 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.212 | Ericsson | Noted - Revised |
R1‑124507 | 25.213 CR0116R1 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.213 | Ericsson | Revised |
R1‑124508 | 25.214 CR0689R1 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.214 | Ericsson | Noted - Revised |
R1‑124509 | On ΔT2TP and E-DPCCH/E-DPDCH gain factor ranges | Ericsson, ST-Ericsson | Noted |
R1‑124510 | Inter-Stream Interference Compensation for HSUPA MIMO | Ericsson, ST-Ericsson | Noted |
R1‑124511 | Comments to CRs for HSUPA MIMO with 64QAM | Ericsson, ST-Ericsson | Noted |
R1‑124512 | Initial considerations on Heterogeneous Networks for UMTS | Ericsson, ST-Ericsson | Noted |
R1‑124513 | Heterogeneous Network Deployment Scenarios | Ericsson, ST-Ericsson | Noted |
R1‑124514 | Simulation Assumptions for Evaluating Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑124515 | Paging and CSI-RS | Nokia, Nokia Siemens Networks | Noted |
R1‑124516 | Views on search space and aggregation levels of ePDCCH | CATR | Withdrawn |
R1‑124517 | Effect of Restricting Maximum Transport Block Size on eNodeB Rate Control | General Dynamics Broadband | Not treated |
R1‑124518 | Initial Power Value upon Receiving RAR in Multiple TA | ASUSTeK | Not treated |
R1‑124519 | ACK/NACK repetition for PDSCH scheduled by ePDCCH | ASUSTeK | Not treated |
R1‑124520 | Outstanding Issues for Antenna Ports Quasi Co-location | Ericsson, ST-Ericsson | Revised |
R1‑124521 | The CFO distortions in inter-band and non-contiguous CA scenario | Institute for Information Industry (III) | Not treated |
R1‑124522 | On detection of MIB in FeICIC | Ericsson, ST-Ericsson | Noted |
R1‑124523 | Remaining PHY aspects of random access on secondary cells | Texas Instruments | Noted |
R1‑124524 | 25.214 CR0695 (Rel-11, F) Clarification of F-TPICH configuration | Qualcomm Incorporated | Agreed |
R1‑124525 | 25.211 CR0301 (Rel-11, F) Clarification of TTI Alignment | Qualcomm Incorporated | Noted - Revised |
R1‑124526 | 25.214 CR0696 (Rel-11, F) Clarification of the random access procedure for Concurrent TTI Deployment | Qualcomm Incorporated | Noted |
R1‑124527 | Remaining design aspects of UL MIMO | Qualcomm Incorporated | Revised |
R1‑124528 | Design Objectives and Deployment Scenarios for Hetnets | Qualcomm Incorporated | Noted |
R1‑124529 | UL and DL Interference Aspects in Hetnets for UMTS | Qualcomm Incorporated | Noted |
R1‑124530 | Range Expansion Techniques for Hetnets | Qualcomm Incorporated | Noted |
R1‑124531 | Simulation Assumptions for Hetnets | Qualcomm Incorporated | Noted |
R1‑124532 | Mobility Aspects for Hetnets | Qualcomm Incorporated | Noted |
R1‑124533 | Correction to Assumed CSI-RS Transmissions in Secondary Cells | Ericsson, ST-Ericsson | Noted |
R1‑124534 | Peak CSI Processing Consideretions on the Triggering of CSI Subframe Sets | Ericsson, ST-Ericsson | Not treated |
R1‑124535 | Resource Element Mapping for Support of CoMP Transmission | Ericsson, ST-Ericsson | Noted |
R1‑124536 | Details of Transmisison Modes 9 and 10 in Rel-11 | Ericsson, ST-Ericsson | Not treated |
R1‑124537 | Fallback Transmission Scheme in TM10 | Ericsson, ST-Ericsson | Not treated |
R1‑124538 | Limiting UE Complexity for CoMP CSI Reporting | Ericsson, ST-Ericsson | Not treated |
R1‑124539 | Configuration of Pc for CSI Processes | Ericsson, ST-Ericsson | Noted |
R1‑124540 | Rank and Subband Inheritance between CSI Processes | Ericsson, ST-Ericsson | Revised |
R1‑124541 | On aperiodic reporting of CSI Processes | Ericsson, ST-Ericsson | Noted |
R1‑124542 | Remaining issues for inter-band TDD CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑124543 | Discussion on the power error ramping issue in uplink | Huawei, HiSilicon | Noted |
R1‑124544 | Open issues in 36.211 | Ericsson | Noted |
R1‑124545 | EPDCCH-PUCCH resource allocation for TDD | Panasonic | Not treated |
R1‑124546 | Remaining Details of Search Space and Aggregation Levels | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑124547 | Outstanding Issues for Antenna Ports Quasi Co-location | Ericsson, ST-Ericsson | Noted |
R1‑124548 | On the EPDCCH starting symbol configuration | Nokia, Nokia Siemens Networks | Noted |
R1‑124549 | Considerations on subframes in which to monitor EPDCCH | Nokia, Nokia Siemens Networks | Noted |
R1‑124550 | Parallel transmissions of SRS+SRS in different TAGs | HTC | Not treated |
R1‑124551 | Discussion on EPDCCH Search Space Design | HTC | Not treated |
R1‑124552 | Discussion on EPDCCH Antenna Port Association | HTC | Not treated |
R1‑124553 | Remaining details of ECCE and EREG resource mapping | LG Electronics | Not treated |
R1‑124554 | Details of association between DMRS ports and EPDCCH transmission | LG Electronics | Not treated |
R1‑124555 | EPDCCH search space and aggregation levels | Panasonic | Noted |
R1‑124556 | Details on downlink CoMP control signalling | New Postcom | Not treated |
R1‑124557 | Impact on UE interference estimation due to overlapping IMR | HTC | Noted |
R1‑124558 | Remaining issues on quasi-co-location between CSI-RS, CRS and DMRS | Samsung | Noted |
R1‑124559 | Offset Table Design for E-ROCH | Nokia Siemens Networks | Noted |
R1‑124560 | Impact of restriction on CoMP CSI processing | NTT DOCOMO | Noted |
R1‑124561 | Mapping of ECCE to EREG for localized and distributed transmission | Huawei, HiSilicon | Noted |
R1‑124562 | [Draft] Reply LS on UE measurements in support of the two-stage MIMO OTA test method | Nokia | Noted - Revised |
R1‑124563 | Remaining aspects of DM-RS for EPDCCH | Qualcomm Inc. | Noted |
R1‑124564 | Avoiding excess DTX bits in channel selection for TDD inter-band CA | Research In Motion UK Limited | Noted |
R1‑124565 | 36.213 CR0391 (Rel-10, F) Correction of codebook subsampling for PUCCH 2-1 to the duplicated description | NEC group | Agreed |
R1‑124566 | Search Space Design for Localized E-PDCCH Transmission | NTT DOCOMO | Not treated |
R1‑124567 | Way Forward on eCCE/eREG mapping for EPDDCH | Panasonic, Samsung, Sharp | Noted |
R1‑124568 | Way Forward on EPDDCH search space | Panasonic, InterDigital, DOCOMO | Noted |
R1‑124569 | Remaining details of association between DM-RS ports and EPDCCH transmission | Qualcomm Inc. | Not treated |
R1‑124570 | Way Forward on Power control for PUCCH format 1b with Channel Selection with TxD | Ericsson, ST-Ericsson, Texas Instruments, LG Electronics | Noted |
R1‑124571 | Way forward on starting OFDM symbol for ePDCCH | ZTE , New Postcom, Panasonic | Noted |
R1‑124572 | Remaining details on PUCCH format 1b with channel selection for TDD CA with different TDD UL-DL configuration | Pantech | Not treated |
R1‑124573 | Way Forward on fallback operation in TM10 | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, MediaTek, Nokia, Nokia Siemens Networks, Qualcomm, Research In Motion | Noted |
R1‑124574 | Scrambling sequence initialization of DMRS for ePDCCH | Texas Instruments | Noted |
R1‑124575 | Way Forward on CSI-RS and CRS quasi co-location | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE | Revised |
R1‑124576 | Way Forward on ePDCCH Quasi Co-Location Assumptions | Ericsson, Intel, ST-Ericsson | Noted |
R1‑124577 | Remaining design aspects of UL MIMO | Qualcomm Incorporated | Noted |
R1‑124578 | 25.211 CR0301r1 (Rel-11, F) Clarification of TTI Alignment | QUALCOMM Incorporated | Withdrawn |
R1‑124579 | 25.211 CR0296r3 (Rel-11,B), Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Endorsed |
R1‑124580 | 25.212 CR0312r3 (Rel-11, B), Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Endorsed |
R1‑124581 | 25.213 CR0115r4 (Rel-11, B) Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Endorsed |
R1‑124582 | 25.214 CR0688r3 (Rel-11, B), Introduction of UL MIMO with 64QAM | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | Endorsed |
R1‑124583 | 25.212 CR0315r1 (Rel-10, F) Clarification of HS-SCCH order for MC-HSPA | Huawei, HiSilicon, Ericsson, ST-Ericsson, Research in Motion, Nokia Siemens Networks | Agreed |
R1‑124584 | 25.212 CR0316r1 (Rel-11, A) Clarification of HS-SCCH order for MC-HSPA | Huawei, HiSilicon, Ericsson, ST-Ericsson, Research in Motion, Nokia Siemens Networks | Agreed |
R1‑124585 | 25.211 CR0297R2 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.211 | Ericsson | Noted - Revised |
R1‑124586 | 25.213 CR0116R2 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.213 | Ericsson | Noted - Revised |
R1‑124587 | Chairman’s notes of the UTRA maintenance, 4-branch MIMO for HSDPA, MIMO with 64QAM for HSUPA, and UMTS HetNet detailed assumptions sessions | HSPA session chairman (Nokia Siemens Networks) | Endorsed |
R1‑124588 | 25.211 CR0297R3 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.211 | Ericsson | Endorsed |
R1‑124589 | 25.212 CR0313R2 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.212 | Ericsson | Endorsed |
R1‑124590 | 25.213 CR0116R3 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.213 | Ericsson | Endorsed |
R1‑124591 | 25.214 CR0689R2 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.214 | Ericsson | Withdrawn |
R1‑124592 | RAN1 UE capability list on Rel-11 LTE.xls | NTT DOCOMO | Agreed |
R1‑124593 | LS on LTE Rel-11 UE capability list | RAN1, NTT DOCOMO | Agreed |
R1‑124594 | LS on RRC parameters needed for EPDCCH | RAN1, Alcatel-Lucent | Agreed |
R1‑124595 | void | - | Withdrawn |
R1‑124596 | Summary of CoMP QCL APs Session | Ad-hoc chairman (Ericsson) | Endorsed |
R1‑124597 | Summary of CA Uplink Control Signalling Session | Ad-hoc chairman (NTT DOCOMO) | Endorsed |
R1‑124598 | Summary of CA TDD Session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑124599 | Summary of CSI Feedback Modes Session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑124600 | Summary of Rel-11 UE capabilities | Ad-hoc chairman (NTT DOCOMO) | Endorsed |
R1‑124601 | Way Forward on PUCCH 1b with channel selection for different TDD UL/DL configurations inter-band CA | Research In Motion, LG Electronics, Intel, Sharp | Noted |
R1‑124602 | Way Forward on association between DMRS port and localized EPDCCH transmission | Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATT, Ericsson, ST-Ericsson, HTC, Huawei, HiSilicon, InterDigital, New Postcom, Nokia, NSN, Panasonic, RIM, Samsung, Sharp | Not treated |
R1‑124603 | On Rel-11 UE features | Ericsson, ST-Ericsson | Not treated |
R1‑124604 | Way Forward on applicability of the SORTD to the single cell | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Intel, Nokia Siemens Networks, Nokia, Texas Instruments | Noted |
R1‑124605 | Way Forward on Handling of overlapping states in TDD Inter-band CA | Intel, Research In Motion, Pantech, Potevio | Noted |
R1‑124606 | Offline discussion on remaining issues of simultaneous HARQ-ACK and periodic CSI transmission | Huawei, HiSilicon | Noted |
R1‑124607 | Way Forward on Limiting UE Processing Complexity | Huawei, HiSilicon, Intel, Mediatek, ZTE | Noted |
R1‑124608 | Way Forward on Limiting UE Complexity for CoMP CSI Processing | Ericsson, Motorola Mobility, New Postcom, Nokia, Nokia Siemens Networks, Panasonic, Renesas, Samsung, ST-Ericsson, Texas Instruments, Qualcomm | Noted |
R1‑124609 | Way Forward on configuration of Pc for a CSI Process | Ericsson, Alcatel-Lucent, Alcatel Lucent Shanghai Bell, AT&T, CATT, Fujitsu, Interdigital, MediaTek, NTT DoCoMo, Panasonic, Renesas, Samsung, ST-Ericsson, Texas Instruments, NEC, Nokia, Nokia Siemens Networks, Qualcomm | Noted |
R1‑124610 | Report on the offline discussion on the configuration of subframes for monitoring EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124611 | Way Forward on soft buffer and HARQ process handling | Ericsson, ST-Ericsson, Renesas, CATT | Noted |
R1‑124612 | Way Forward on IMR Collisions Randomization | Huawei, HiSilicon, NTT DOCOMO, CMCC, Hitachi, Kyocera, Nokia, Nokia Siemens Networks, Sharp, Qualcomm | Noted |
R1‑124613 | PDSCH scrambling randomization | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Nokia, NSN,Samsung,TI, ZTE | Agreed |
R1‑124614 | Way Forward on PUSCH case D | CMCC, Nokia, NSN, Samsung | Not treated |
R1‑124615 | Way Forward on soft buffer handling | CMCC, ITRI, Panasonic, Samsung | Noted |
R1‑124616 | On Rel-11 UE capabilities | Nokia, Nokia Siemens Networks | Not treated |
R1‑124617 | Way Forward on CSI-RS and CRS quasi co-location | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, LG Electronics | Noted |
R1‑124618 | Way Forward on Aperiodic CSI triggering for CoMP | InterDigital, CATT, Huawei, HiSilicon, Intel, ITRI, NEC, New Postcom, Pantech, Qualcomm, Samsung | Noted |
R1‑124619 | Remaining issues on PUCCH Format 1b with CS design for inter-band CA | Intel Corporation | Noted |
R1‑124620 | Possible approach for FDD TDD differentiation | NTT DOCOMO | Noted |
R1‑124621 | Way Forward on half duplex Ues for TDD inter-band CA in Rel-11 | CATT | Withdrawn |
R1‑124622 | Way forward on remaining issues for HARQ-ACK transmission for TDD inter-band CA in Rel-11 | CATT, Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd., Qualcomm, New Postcom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑124623 | Way Forward on downlink control signalling for PDSCH RE mapping and quasi-co-location of CSI-RS and DMRS | ZTE, Ericsson, ST-Ericsson, Huawei, HiSilicon, Panasonic, Samsung | Noted |
R1‑124624 | Skeleton of UMTS Heterogeneous Networks Technical Report | Huawei, HiSilicon | Agreed |
R1‑124625 | Rank and Subband Inheritance between CSI Processes | Ericsson, ST-Ericsson | Noted |
R1‑124626 | Downlink control signalling for CoMP | ZTE | Not treated |
R1‑124627 | Way Forward on IMR enhancements | Intel Corporation | Noted |
R1‑124628 | Way forward on signaling for PDSCH mapping for CoMP and quasi co-location information between DMRS and CSI-RS | Huawei, Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATT, CMCC, ETRI, HiSilicon, Intel, InterDigital, Mediatek, New Postcom, Renesas | Noted |
R1‑124629 | Way Forward on PUCCH Format 1a/1b Resource Determination | CATT, Intel, NTT DOCOMO, Panasonic, Samsung, Sharp | Noted |
R1‑124630 | Way Forward on Network Configured Quasi Co-Location | Ericsson, ST-Ericsson | Withdrawn |
R1‑124631 | Way Forward on PUCCH resource in response to ePDCCH for FDD | ZTE, Ericsson, ST-Ericsson, LGE, Huawei, HiSilicon, China Telecom, IDC, New Postcom, Mediatek, Nokia, NSN | Not treated |
R1‑124632 | Way Forward on SS and PBCH detection in feICIC | LG Electronics, NEC, ETRI | Noted |
R1‑124633 | Way forward on UE behavior for large Transport Blocks | LG Electronics, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Fujitsu, New Postcom | Noted |
R1‑124634 | Progress of Scenarios and Requirements of Small Cell Enhancements | CMCC | Not treated |
R1‑124635 | LS on MIB detection in feICIC | Qualcomm | Noted - Revised |
R1‑124636 | Way Forward on scrambling initialization for EPDCCH DMRS | LG Electronics, Ericsson, ST-Ericsson, InterDigital, MediaTek, Nokia, Nokia Siemens Networks | Noted |
R1‑124637 | Way Forward on eREG mapping | Panasonic, Sharp, Intel, Alcatel Lucent, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, InterDigital, New Postcom, LG electronics, Samsung | Not treated |
R1‑124638 | Way Forward on rank and subband inheritance between CSI Processes for Aperiodic CSI Modes | Ericsson, Alcatel Lucent, Alcatel-Lucent Shanghai Bell, AT&T, CATT, CMCC, Huawei, Hi Silicon, InterDigital, LG Electronics, RIM, Samsung, ST-Ericsson, Texas Instruments | Noted |
R1‑124639 | Way Forward on rank and subband inheritance between CSI Processes for Periodic CSI Modes | Ericsson, Alcatel Lucent, Alcatel-Lucent Shanghai Bell, AT&T, CATT, CMCC, Huawei, Hi Silicon, InterDigital, LG Electronics, RIM, Samsung, ST-Ericsson, Texas Instruments | Not treated |
R1‑124640 | Way Forward proposal on BD split for ePDCCH | Huawei, Hi-Silicon, Ericsson, ST-Ericsson, Intel | Noted |
R1‑124641 | Way forward on remaining issues of DCI format 1A in TM10 | Huawei, HiSilicon, Ericsson, ST-Ericsson | Noted |
R1‑124642 | Way Forward on higher-layer signaling for PDSCH mapping and quasi co-location | Huawei, HiSilicon, Ericsson, ST-Ericsson | Noted |
R1‑124643 | Summary of Ad Hoc Session on EPDCCH | KDDI | Noted |
R1‑124644 | Joint proposal on initial UL PC in multiple TA | LG Electronics, Ericsson, ST-Ericsson, Nokia Siemens Networks, Nokia, Sharp, ASUSTek, Panasonic | Noted |
R1‑124645 | Discussion document on EPDCCH search space and aggregation levels | Panasonic | Noted |
R1‑124646 | Possible Ways Forward on Rel-11 UE capabilities | Ericsson | Noted |
R1‑124647 | Way Forward on PDSCH mapping on IMR REs | LG Electronics, Ericsson, ST-Ericsson | Noted |
R1‑124648 | Offline discussion on Parallel Reception of PDSCH on Scell and Msg 2 on Pcell | ZTE | Noted |
R1‑124649 | Way Forward on CSI-RS and CRS quasi co-location | NSN, Nokia, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, MediaTek, LGE, ZTE, Renesas | Noted |
R1‑124650 | Way forward for consideration of UE complexity on CSI processing for TDD | ZTE, CATT, CMCC | Noted |
R1‑124651 | Email/offline discussion summary for TP checking on VCID for PUSCH DMRS in 36.211 | CATT | Noted |
R1‑124652 | Email/offline discussion summary for TP checking on CQI for non-PMI/RI reporting in 36.213 | CATT | Noted - Revised |
R1‑124653 | Draft_CR for 36.213 - correction on UE-specific RS overhead for deriving CQI when PMI/RI is configured in TM9 | CATT | Noted |
R1‑124654 | DRAFT LS on 36.211 open issue: Specifying the assumptions on the uplink-downlink configuration and the guard period overlap for TDD carrier aggregation | Ericsson | Noted |
R1‑124655 | RAN1 UE capability list on Rel-11 LTE.xls | NTT DOCOMO | Noted - Revised |
R1‑124656 | Link Level Simulation Results on SORTD for TDD Channel Selection using Rel-8 Mapping Table | Intel Corporation | Not treated |
R1‑124657 | Draft LS on LTE Rel-11 UE capability list | NTT DOCOMO | Noted - Revised |
R1‑124658 | [Draft] LS on additional RRC parameters for Enh. CA WI | Ericsson | Not treated |
R1‑124659 | Offline Proposal on PUCCH Format 1a/1b Resource Allocation for EPDCCH | Panasonic, Samsung, RIM, CATT, Sharp, Intel, InterDigital | Noted |
R1‑124660 | Way Forward proposal on BD split for ePDCCH | Panasonic, DOCOMO, Samsung, CATT, Fujitsu, ZTE, InterDigital , Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, New Postcom, Qualcomm, LG Electronics | Noted |
R1‑124661 | Response LS on Pcmax definition for the partial overlap period between different TAGs | RAN4, Huawei | Not treated |
R1‑124662 | Clarification on DL CoMP Rel-11 UE capabilities | Ericsson, Samsung, Docomo, Renesas, Orange, LG, Qualcomm | Noted |
R1‑124663 | Proposal on specification change of guard period assumption for Rel-11 | Huawei, HiSilicon | Noted |
R1‑124664 | TP to 36.213 on initial UL PC in multiple TA | LG Electronics | Agreed |
R1‑124665 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method | RAN1, Nokia | Agreed |
R1‑124666 | LS on MIB detection in feICIC | RAN1, Qualcomm | Agreed |
R1‑124667 | Email/offline discussion summary for TP checking on CQI for non-PMI/RI reporting in 36.213 | CATT | Agreed |
R1‑124668 | RAN1 UE capability list on Rel-11 LTE.xls | NTT DOCOMO | Noted - Revised |
R1‑124669 | RRC Parameters for Downlink CoMP | DL CoMP Rapporteur (Samsung) | Agreed |
R1‑124670 | RRC parameters for CA enhancements | Ericsson | Agreed |
R1‑124671 | Updated RRC parameters for EPDCCH | Alcatel-Lucent (Rapporteur) | Agreed |
R1‑124672 | LS on RRC parameters needed for Rel-11 | RAN1, Alcatel-Lucent | Agreed |
R1‑124673 | LS on LTE Rel-11 UE capability list | RAN1, NTT DOCOMO | Noted - Revised |
R1‑124674 | LS on RRC parameters needed for EPDCCH | RAN1, Alcatel-Lucent | Noted - Revised |
page generated from database: 2024-07-20 12:15:34