3GPP TDocs (written contributions) at meeting
Meeting: C4-39 - 2008-05-05 to 2008-05-09, Cape Town
meeting id: C4-39 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C4‑081033 | Draft Agenda | CT4 chairman | Revised |
C4‑081034 | Detailed agenda & time plan for CT4 #39: status at document deadline | CT4 chairman | Revised |
C4‑081035 | Detailed agenda & time plan for CT4 #39: status on eve of meeting | CT4 chairman | Agreed |
C4‑081036 | Proposed allocation of documents to agenda items for CT4 #39: status at document deadline | CT4 chairman | Revised |
C4‑081037 | Proposed allocation of documents to agenda items for CT4 #39 status on eve of meeting | CT4 chairman | Agreed |
C4‑081038 | CT4#38 Draft Meeting report from Puerto Vallarta, Mexico | MCC | Approved |
C4‑081039 | CT4#38bis Draft Meeting report from Jeju Island, Republic of Korea | MCC | Revised |
C4‑081040 | Work Plan | MCC | Noted |
C4‑081041 | Future meetings | MCC | Noted |
C4‑081042 | Making all Indication IEs to an uniform format | ZTE | Revised |
C4‑081043 | Pseudo-CR on Delete bearer messages across S11 interface during TAU/RAU procedure | ZTE | Revised |
C4‑081044 | Pseudo-CR on Create bearer messages across S11 interface during TAU procedure | ZTE | Revised |
C4‑081045 | Pseudo-CR on Create bearer messages across S4 interface during RAU procedure | ZTE | Revised |
C4‑081046 | Pseudo-CR on Mobility management messages across S10 interface during Inter eNodeB handover with MME relocation procedure | ZTE | Revised |
C4‑081047 | Discussion Paper on I3 interface for IMS Centralised Service Control | LM Ericsson | Noted |
C4‑081048 | BFCB Termination Configuration Procedures | LM Ericsson | Revised |
C4‑081049 | Clarification of MSRP configuration Procedure | LM Ericsson | Revised |
C4‑081050 | Alignment of SDP Usage | LM Ericsson | Revised |
C4‑081051 | Alignment of SDP Usage | LM Ericsson | Revised |
C4‑081052 | Handling of TISPAN Mp Profile | LM Ericsson | Noted |
C4‑081053 | Stage 2 Procedures Section for A interface over IP | LM Ericsson | Revised |
C4‑081054 | Stage 3 support for A interface over IP | LM Ericsson | Revised |
C4‑081055 | Draft CR on DTMF interworking procedures in SIP-I based Nc | LM Ericsson | Revised |
C4‑081056 | Call Establishment Procedures | LM Ericsson | Noted |
C4‑081057 | Pseudo-CR on MGW Id and use of unspecified connection address | LM Ericsson | Revised |
C4‑081058 | Handling of TISPAN Mn profiles | LM Ericsson | Noted |
C4‑081059 | Addition of SIP-I based Nc within the scope of TS 29.232 | Alcatel-Lucent | Revised |
C4‑081060 | Revision of scope of TS 23.205 | Alcatel-Lucent | Revised |
C4‑081061 | 23.231 Pseudo-CR on Mandatory support of IPv4 on SIP-I based Nc interface | Alcatel-Lucent | Revised |
C4‑081062 | Mandatory support of IPv4 for SIP-I based Nc | Alcatel-Lucent | Noted |
C4‑081063 | SIP Resource Priority header | Alcatel-Lucent | Withdrawn |
C4‑081064 | SIP Resource Priority header | Alcatel-Lucent | Withdrawn |
C4‑081065 | CAT TR Editorial corrections | Alcatel-Lucent | Revised |
C4‑081066 | CAT interaction with MPTY | Alcatel-Lucent | Withdrawn |
C4‑081067 | CAT interaction with USSD | Alcatel-Lucent | Withdrawn |
C4‑081068 | CAT interaction with carrier service | Alcatel-Lucent | Withdrawn |
C4‑081069 | Use Of Release Bearer Procedure | LM Ericsson | Revised |
C4‑081070 | Use Of Release Bearer Procedure | LM Ericsson | Revised |
C4‑081071 | Coding of UDP Port Property | LM Ericsson | Agreed |
C4‑081072 | Coding of UDP Port Property | LM Ericsson | Agreed |
C4‑081073 | Coding of UDP Port Property | LM Ericsson | Agreed |
C4‑081074 | Coding of UDP Port Property | LM Ericsson | Agreed |
C4‑081075 | Use of IP Transport and UDP Properties in Local Control Descriptor | LM Ericsson | Revised |
C4‑081076 | Use of IP Transport and UDP Properties in Local Control Descriptor | LM Ericsson | Revised |
C4‑081077 | Use of IP Transport and UDP Properties in Local Control Descriptor | LM Ericsson | Revised |
C4‑081078 | Correction to SDP Parameters for SIP-I on Nc | LM Ericsson | Withdrawn |
C4‑081079 | Tunnel management procedures for PMIP | Starent | Revised |
C4‑081080 | Evolved GPRS Tunnelling Protocol (eGTP) for EPS | Rapporteur | Agreed |
C4‑081081 | Further editorial modifications to eGTP spec | Rapporteur | Noted |
C4‑081082 | Graceful shutdown of GTPv2 entity | Nokia Siemens Networks | Noted |
C4‑081083 | Fallback to GTPv1 mechanism | Nokia Siemens Networks | Revised |
C4‑081084 | Fully qualified TEID IE | Nokia Siemens Networks | Revised |
C4‑081085 | Revised coding of the IP address IE | Nokia Siemens Networks | Withdrawn |
C4‑081086 | Maximum length of the IEs | Nokia Siemens Networks | Withdrawn |
C4‑081087 | User plane for GTPv2 | Nokia Siemens Networks | Noted |
C4‑081088 | Essential correction to the Initiate PDP Context Activation Response message | Nokia Siemens Networks | Agreed |
C4‑081089 | Essential correction to the Initiate PDP Context Activation Response message | Nokia Siemens Networks | Agreed |
C4‑081090 | Adding the Deletion Notification of a Public Identity to the AS | Alcatel-Lucent | Revised |
C4‑081091 | Comments on CT3's Diameter TR 29.909 v1.1.0 | Alcatel-Lucent | Revised |
C4‑081092 | EPS TS 29.276 S101, 103 -Addition of specific references for 3GPP2 Sector ID and 3GPP GTPv2 Error Handling, etc. | Alcatel-Lucent | Agreed |
C4‑081093 | Adding the Deletion Notification of a Public Identity to the AS | Alcatel-Lucent | Postponed |
C4‑081094 | Removal of Informative SIP Digest Annex for NGN R2 | Alcatel-Lucent | Agreed |
C4‑081095 | Use of MME number/HSS number | ZTE | Withdrawn |
C4‑081096 | interworking scenario with two IWFs | ZTE | Revised |
C4‑081097 | Update Bearer Message across S11 interface during TAU/RAU procedures | ZTE | Revised |
C4‑081098 | GTP-C header for Echo and Version Not Supported messages | Nokia Siemens Networks | Revised |
C4‑081099 | Error handling | Nokia Siemens Networks | Revised |
C4‑081100 | GTPv2-U End Marker message for TR 29.803 | Nokia Siemens Networks | Agreed |
C4‑081101 | DNS alternatives for TR 29.803 | Nokia Siemens Networks | Noted |
C4‑081102 | Removing GTPv0 support from R8 GTPv1 | Nokia Siemens Networks | Revised |
C4‑081103 | removal of E.164 Numbers for MME and HSS | Nokia Siemens Networks, Ericsson | Revised |
C4‑081104 | S6a Authentication Info Retrieval | Nokia Siemens Networks, Ericsson | Revised |
C4‑081105 | S6a Cancel Location | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081106 | S6a Delete Subscriber Data | Nokia Siemens Networks | Noted |
C4‑081107 | S6a Insert Subscriber Data | Nokia Siemens Networks, Ericsson | Revised |
C4‑081108 | S6a Purge MS | Nokia Siemens Networks, Ericsson | Revised |
C4‑081109 | S6a Reset | Nokia Siemens Networks, Ericsson | Revised |
C4‑081110 | SAE Interworking with pre-Rel-8 HSS | Nokia Siemens Networks | Noted |
C4‑081111 | EPS Restoration | Nokia Siemens Networks | Revised |
C4‑081112 | Key choice correction | Nokia, Nokia Siemens Networks | Revised |
C4‑081113 | Originating services after call forwarding | Nokia Siemens Networks | Agreed |
C4‑081114 | Pseudo-CR on EPS TS 29.276 Addition of Reliable Delivery of Signalling Messages | Alcatel-Lucent | Agreed |
C4‑081115 | S102 Error Handling | Nortel | Agreed |
C4‑081116 | S102 Timer | Nortel | Agreed |
C4‑081117 | Additional S102 messages | Nortel | Agreed |
C4‑081118 | NAI for non-3GPP Access | Nortel | Revised |
C4‑081119 | S6b/H2 Procedures Description in TS 29.273 | Qualcomm Europe | Revised |
C4‑081120 | 29.274 IE Conditionality Definition | Ericsson | Revised |
C4‑081121 | 29.274 TEID-C and TEID-U granularity | Ericsson, CATT | Agreed |
C4‑081122 | 29.274 UDP/IP Protocol Stack Usage | Ericsson | Revised |
C4‑081123 | 29.274 Update of Presence Requirement and Comprehension Required fields of S11 Create Bearer Response Messages | Ericsson | Revised |
C4‑081124 | 29.803 DNS Procedures for EPC Network Node Selection | Ericsson | Revised |
C4‑081125 | 29.803 DNS sub-domains employed for EPC Network Node Selection | Ericsson | Noted |
C4‑081126 | 29.803 RFC 3958 DNS procedure for EPC Network Node Selection | Ericsson | Noted |
C4‑081127 | 29.803 DNS procedure for PGW Candidate Node Selection | Ericsson | Revised |
C4‑081128 | WID Domain Name System Procedures for Evolved Packet System (EPS) | TeliaSonera | Revised |
C4‑081129 | Skeleton for Domain Name System Procedures | TeliaSonera | Revised |
C4‑081130 | 29.273 Information Elements for AAA interfaces | TeliaSonera | Revised |
C4‑081131 | Updating Mn interface profile "threegimscsiw" to version 3 | Nokia Siemens Networks | Agreed |
C4‑081132 | Protocol negociation result procedures between MSC Server and MGW | Nokia Siemens Networks | Revised |
C4‑081133 | (29.882)Multimedia call flows in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Revised |
C4‑081134 | (29.882)Multimedia call flows in (G)MSC Server switch architecture use based on UE capabilities | Nokia Siemens Networks | Withdrawn |
C4‑081135 | (29.882)Fallback call flows in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑081136 | (29.882) Fallback call flows in (G)MSC Server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑081137 | (29.882) CLIP, CLIR in CAT Server switch architecture with routing back to GMSC Server and (G)MSC Server switch architecture use based on UE capabilities | Nokia Siemens Networks | Revised |
C4‑081138 | Proposal on floor control algorithms | ZTE | Withdrawn |
C4‑081139 | P-CR on Update bearer message for S1 release procedure | CATT | Revised |
C4‑081140 | P-CR on Update bearer message for TAU procedure across S5/S8 interface | CATT | Postponed |
C4‑081141 | Proposed new WID on CS-IBCF and CS-TrGW definition in 3GPP specifications | Telecom Italia | Revised |
C4‑081142 | Pseudo-CR on PDN GW reallocation support on S6b in TS 29.273 | Telecom Italia, TeliaSonera, Qualcomm | Revised |
C4‑081143 | S6a Notification | Nokia Siemens Networks, Ericsson | Revised |
C4‑081144 | Comparison of different alternatives for CAT | China mobile | Revised |
C4‑081145 | S6a Update Location Procedures | LM Ericsson | Withdrawn |
C4‑081146 | S6a Authentication Information Procedures | LM Ericsson | Withdrawn |
C4‑081147 | S6a Cancel Location Procedures | LM Ericsson | Withdrawn |
C4‑081148 | S6a Notification Procedures | LM Ericsson | Withdrawn |
C4‑081149 | S6a Insert Subscriber Data Procedures | LM Ericsson | Withdrawn |
C4‑081150 | S6a Purge Procedures | LM Ericsson | Withdrawn |
C4‑081151 | S6a Reset Procedures | LM Ericsson | Withdrawn |
C4‑081152 | Modification of the of TS 29.272 | LM Ericsson | Withdrawn |
C4‑081153 | Missing signal in process VLR_CCBS_Recall_Manager | LM Ericsson | Revised |
C4‑081154 | Emergency Registration for REGISTRATION_AND_CAPABILITIES | LM Ericsson | Agreed |
C4‑081155 | Emergency Registration for REGISTRATION_AND_CAPABILITIES | LM Ericsson | Agreed |
C4‑081156 | Removal of restriction for barred user at Emergency Registrations | LM Ericsson, ZTE Corporation | Agreed |
C4‑081157 | Removal of restriction for barred user at Emergency Registrations | LM Ericsson, ZTE Corporation | Agreed |
C4‑081158 | Proposed conclusion on the P-CSCF service interruption scenario in TR 23.820 | LM Ericsson | Revised |
C4‑081159 | Behaviour of the new S-CSCF after taking over in terminating case (TR 23.820) | LM Ericsson | Postponed |
C4‑081160 | IMS Restoration Procedures TS skeleton | LM Ericsson | Agreed |
C4‑081161 | IMS Restoration Procedures WID | LM Ericsson | Revised |
C4‑081162 | Alignment of references for NGNR1 and change annex to normative | T-Mobile, DeutscheTelekom | Withdrawn |
C4‑081163 | WID for CT4 aspects of Evolved Packet System Update | Huawei | Revised |
C4‑081164 | General Description | Huawei | Revised |
C4‑081165 | Protocol Specification and Implementation | Huawei | Revised |
C4‑081166 | Delete Subscriber Data | Huawei | Revised |
C4‑081167 | Diameter Protocol Codes Assignments for S6a | Huawei | Postponed |
C4‑081168 | Create Dedicated Bearer Message on GTP based S5S8 within the Dedicated Bearer Activation procedure | Huawei | Revised |
C4‑081169 | Create Default Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081170 | Create Default Bearer Message on GTP based S5/S8 within the UE Requested PDN Connectivity procedure | Huawei | Revised |
C4‑081171 | Delete Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081172 | Delete Bearer Message on GTP based S5/S8 within the UE Requested PDN Disconnection procedure | Huawei | Revised |
C4‑081173 | Delete Bearer Message on S11 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081174 | eNB S1-U TEID | Huawei | Agreed |
C4‑081175 | Discussion on Method of message description | Huawei | Noted |
C4‑081176 | Discussion on sorted Information Elements | Huawei | Noted |
C4‑081177 | Description of Information Elements | Huawei | Withdrawn |
C4‑081178 | Granularity of TEID | Huawei | Withdrawn |
C4‑081179 | Create Forwarding Tunnel messages across S11 interface | Huawei | Revised |
C4‑081180 | Information Elements of messages over S101 | Huawei | Revised |
C4‑081181 | Extension to the Sh-Pull for PNM | Huawei, Vodafone | Postponed |
C4‑081182 | Extension to the Sh-Pull for PNM | Huawei, Vodafone | Postponed |
C4‑081183 | Adding UE Capability As One Service Point Trigger | Huawei | Postponed |
C4‑081184 | Handling of precondition by the GMSC | Huawei | Revised |
C4‑081185 | Identities in the SIP-I based CS network | Huawei | Withdrawn |
C4‑081186 | Interaction with Call Hold | Huawei | Revised |
C4‑081187 | Interaction with Call Waiting | Huawei | Agreed |
C4‑081188 | (G)MSC MGW Tandeming in the SIP-I based CS network | Huawei | Agreed |
C4‑081189 | Amendment & endorsement for RFC 4566 | Huawei | Revised |
C4‑081190 | Amendment & endorsement for RFC 3204 | Huawei | Agreed |
C4‑081191 | Amendment & endorsement for RFC 3323 | Huawei | Withdrawn |
C4‑081192 | Amendment & endorsement for RFC 3325 | Huawei | Withdrawn |
C4‑081193 | Correction on (G)MSC Server switch architecture | Huawei | Revised |
C4‑081194 | Correction on Trigger points in the call on CAT Server Switch Architecture and (G)MSC Server Switch Architecture | Huawei | Agreed |
C4‑081195 | CAT file storage for CAT provisioning | Huawei | Agreed |
C4‑081196 | CAT interaction with CAMEL services | Huawei | Revised |
C4‑081197 | CAT interaction with Optimal routing | Huawei | Revised |
C4‑081198 | Pros & cons of (G)MSC server switch architecture | Huawei | Revised |
C4‑081199 | IWF scenarios for EIR | Huawei | Revised |
C4‑081200 | Mapping Procedures for Scenario Three | Huawei | Agreed |
C4‑081201 | Call Establishment For A Interface user plan on IP with immediate MGW selection | Huawei | Revised |
C4‑081202 | Correction of Server Assignment Type | Huawei | Agreed |
C4‑081203 | Correction of Server Assignment Type | Huawei | Agreed |
C4‑081204 | LS on "Changes to the format of TMGI" | Huawei | Revised |
C4‑081205 | Clarification of several inconsistencies in procedure | Huawei | Revised |
C4‑081206 | Clarification of subscribers' roles in CW procedure | Huawei | Agreed |
C4‑081207 | Correction of the inconsistencies in several procedures description | Huawei | Revised |
C4‑081208 | Extension of Group ID | Huawei | Revised |
C4‑081209 | Extension of Group ID | Huawei | Revised |
C4‑081210 | LS on “Changes to the format of TMGI” | TSG RAN WG3 | Postponed |
C4‑081211 | Reply LS on RAN3 requirements for GTPv2 | TSG RAN WG3 | Noted |
C4‑081212 | Reply LS on “Changes to the format of TMGI” | TSG RAN WG2 | Noted |
C4‑081213 | Reply LS on Key Choice Clarification for GBA | TSG SA WG3 | Noted |
C4‑081214 | LS on SAE Interworking with Pre-REL8 system | TSG CT WG1 | Noted |
C4‑081215 | Reply LS on Message Unprotected between UE and P-CSCF | TSG CT WG1 | Noted |
C4‑081216 | LS on TISPAN redocumentation of simulation services | TSG CT WG1 | Noted |
C4‑081217 | Reply LS on LTE-cell- and eNB-identification | TSG RAN WG2 | Noted |
C4‑081218 | LS on Enhancements for SRNS Relocation | TSG RAN WG3 | Noted |
C4‑081219 | Reply LS on Initiate PDP Context Activation procedure | TSG SA WG2 | Noted |
C4‑081220 | Reply LS on ”Principles on Idle Mode Signalling Reduction” | TSG SA WG2 | Noted |
C4‑081221 | Reply LS on Key Choice Clarification for GBA | TSG SA WG3 | Withdrawn |
C4‑081222 | Reply to LS S3-080467 = C4-081007 on SAE interworking with Pre-REL8 system | TSG SA WG3 | Noted |
C4‑081223 | LS on Moving Early IMS Security Stage 3 details to Stage 3 specifications | TSG SA WG3 | Noted |
C4‑081224 | LS on "New WID on “Encoding formats, transport formats and media description signalling for interworking, QoE, and other enhancements to MTSI-MHI” | TSG SA WG4 | Noted |
C4‑081225 | PMIP6 Binding Revocation Procedures. | Ericsson | Revised |
C4‑081226 | PMIP6 HSS/AAA initiated detach procedure | Ericsson | Withdrawn |
C4‑081227 | PMIP6 Tunnel Management Procedures | Ericsson | Revised |
C4‑081228 | Adding RAT Type at HO procedures | Ericsson | Withdrawn |
C4‑081229 | Refining of PBU/PBA | Ericsson | Revised |
C4‑081230 | Sequence Number in PBU/PBA | Ericsson | Withdrawn |
C4‑081231 | Link Local Address option into PBU/PBA | Ericsson | Withdrawn |
C4‑081232 | Static IP address allocation | Ericsson | Revised |
C4‑081233 | Alternative CoA in PBU/PBA | Ericsson | Agreed |
C4‑081234 | CR 23.003: NAI definition. | Ericsson | Withdrawn |
C4‑081235 | PBU/PBA at PMIP Initial Binding Registration and DeRegistration procedure | Ericsson | Revised |
C4‑081236 | Adding missing HO procedure | Ericsson | Withdrawn |
C4‑081237 | Corrections for S2a and S2b interfaces | Ericsson | Withdrawn |
C4‑081238 | New vendor specific option for PCO | Ericsson | Revised |
C4‑081239 | NAI concept for SAE | Nokia Siemens Networks, Nokia | Withdrawn |
C4‑081240 | Corrections for PMIP Descriptions | Nokia Siemens Networks, Nokia | Withdrawn |
C4‑081241 | Cleanup part in Initial Attach procedure | Nokia Siemens Networks, Nokia | Noted |
C4‑081242 | Adding UE initiated disconnection from PDN | Nokia Siemens Networks, Nokia | Revised |
C4‑081243 | Clarification on Timestamp and Sequence Number | Nokia Siemens Networks, Nokia | Withdrawn |
C4‑081244 | Clarifications and Corrections for Binding Lifetime Extension after Handover | Nokia Siemens Networks, Nokia | Withdrawn |
C4‑081245 | SWa Description | Nokia Siemens Networks, Nokia | Revised |
C4‑081246 | IMS AS Service Data Description for AS Interoperability - Modification of Defined Features | Alcatel-Lucent | Revised |
C4‑081247 | IMS AS Service Data Description for AS Interoperability - Telephony Application Server service data schema - Defined Data | Alcatel-Lucent | Agreed |
C4‑081248 | IMS AS Service Data Description for AS Interoperability - A binary storage approach to defining IMS service data | Alcatel-Lucent | Revised |
C4‑081249 | PMIPv6 binding revocation procedure | NTT DoCoMo | Withdrawn |
C4‑081250 | UE requested PDN disconnection over PMIP based S5 and S8 | NTT DoCoMo | Withdrawn |
C4‑081251 | UE requested PDN disconnection over S2a and S2b | NTT DoCoMo | Withdrawn |
C4‑081252 | PMIPv6 handling of multiple PDN connectivity | NTT DoCoMo | Revised |
C4‑081253 | E-UTRAN detach over PMIP based S5 and S8 | NTT DoCoMo | Withdrawn |
C4‑081254 | Non-3GPP Access Detach procedures over S2a and S2b | NTT DoCoMo | Withdrawn |
C4‑081255 | S2a/S2b procedures with anchoring in S-GW vs. PDN-GW (chained S8 + S2aS2b vs. non-chained) | NTT DoCoMo | Agreed |
C4‑081256 | AoIP Addresses fields used on the Mc interface | Nokia Siemens Networks | Noted |
C4‑081257 | IP transport package properties handling | Nokia Siemens Networks | Postponed |
C4‑081258 | Alignment of 3G Mp with TISPAN MRF | LM Ericsson | Revised |
C4‑081259 | Introduction of Stage 3 Procedure for Message Conference | LM Ericsson | Revised |
C4‑081260 | Binding Revocation | Samsung | Withdrawn |
C4‑081261 | SAE Interworking with pre Rel-8 HPLMNUpdate of solution 6b | Nokia Siemens Networks | Noted |
C4‑081262 | Recommending early access bearer assignment procedure | Nokia Siemens Networks | Revised |
C4‑081263 | MGW ID | Nokia Siemens Networks | Withdrawn |
C4‑081264 | MGW ID | Nokia Siemens Networks | Noted |
C4‑081265 | Pros & cons of (G)MSC server bridge architecture | Huawei | Revised |
C4‑081266 | Addition of IMS Centralized Services related identities | Vodafone, Orange | Revised |
C4‑081267 | Maintenance alignment of TISPAN Rel-2 29.433 with 29.228 and 29.229 in Rel-8 | Alcatel-Lucent | Noted |
C4‑081268 | PBU/PBA cleanup | Samsung | Revised |
C4‑081269 | Insert Subscriber Data | Huawei | Noted |
C4‑081270 | LS on Subscriber and Equipment Trace for EPC and E-UTRAN | TSG SA WG5 | Noted |
C4‑081271 | LS on Diameter Routing Considerations | TSG SA WG5 | Noted |
C4‑081272 | PMIPv6 handling of multiple PDN connectivity | NTT DoCoMo, TeliaSonera | Revised |
C4‑081273 | S6a Notification | Nokia Siemens Networks, Ericsson | Revised |
C4‑081274 | Revision of scope of TS 23.205 | Alcatel-Lucent | Revised |
C4‑081275 | Tunnel management procedures for PMIP | Starent | Noted |
C4‑081276 | Extension of Group ID | Huawei | Agreed |
C4‑081277 | Extension of Group ID | Huawei | Agreed |
C4‑081278 | NAI for non-3GPP Access | Nortel | Revised |
C4‑081279 | Protocol Specification and Implementation | Huawei | Revised |
C4‑081280 | Storage of S-CSCF Information in the HSS (TR 23.820) | Ericsson | Agreed |
C4‑081281 | Updated WID on Service Level Tracing in IMS | LM Ericsson | Endorsed |
C4‑081282 | EPS Restoration | Nokia Siemens Networks | Revised |
C4‑081283 | Alternative solutions for eCALL data service | LM Ericsson | Noted |
C4‑081284 | Redundancy support and restoration procedures in business trunking | ETSI TISPAN | Noted |
C4‑081285 | Clarification of several inconsistencies in procedure | Huawei | Revised |
C4‑081286 | CT4#38bis Draft Meeting report from Jeju Island, Republic of Korea | MCC | Approved |
C4‑081287 | Reply LS on Enhancements for SRNS Relocation | Alcatel-Lucent | Revised |
C4‑081288 | Proposed new WID on CS-IBCF and CS-TrGW definition in 3GPP specifications | Telecom Italia | Endorsed |
C4‑081289 | WID for CT4 aspects of Evolved Packet System Update | Huawei | - |
C4‑081290 | Reply to LS S3-080489 = C4-081222 on SAE interworking with Pre-REL8 system | Nokia Siemens Networks | Revised |
C4‑081291 | EPS Restoration | Nokia Siemens Networks | Agreed |
C4‑081292 | WID Domain Name System Procedures for Evolved Packet System (EPS) | TeliaSonera | Agreed |
C4‑081293 | S6a Insert Subscriber Data | Nokia Siemens Networks, Ericsson | Revised |
C4‑081294 | Skeleton for Domain Name System Procedures | TeliaSonera | Agreed |
C4‑081295 | 29.803 DNS Procedures for EPC Network Node Selection | Ericsson | Agreed |
C4‑081296 | removal of E.164 Numbers for MME and HSS | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081297 | S6a Authentication Info Retrieval | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081298 | S6a Insert Subscriber Data | Nokia Siemens Networks, Ericsson | Revised |
C4‑081299 | Delete Subscriber Data | Huawei, Nokia Siemens Networks | Revised |
C4‑081300 | Joint CT3/4 session on Unified guidelines for Diameter usage within 3GPP | CT3 Chairman | Noted |
C4‑081301 | Comments on CT3's Diameter TR 29.909 v1.1.0 | Alcatel-Lucent | Revised |
C4‑081302 | LS on Direct data forwarding for inter 3GPP RAT handover | Huawei | Approved |
C4‑081303 | Reply LS on RAN3 requirements for GTPv2 | Nokia Siemens Networks | Approved |
C4‑081304 | Making all Indication IEs to an uniform format | ZTE | Agreed |
C4‑081305 | Pseudo-CR on Delete bearer messages across S11 interface during TAU/RAU procedure | ZTE | Revised |
C4‑081306 | Pseudo-CR on Create bearer messages across S11 interface during TAU procedure | ZTE | Revised |
C4‑081307 | Pseudo-CR on Create bearer messages across S4 interface during RAU procedure | ZTE | Revised |
C4‑081308 | Pseudo-CR on Mobility management messages across S10 interface during Inter eNodeB handover with MME relocation procedure | ZTE | Revised |
C4‑081309 | Fallback to GTPv1 mechanism | Nokia Siemens Networks | Revised |
C4‑081310 | Fully qualified TEID IE | Nokia Siemens Networks | Agreed |
C4‑081311 | Update Bearer Message across S11 interface during TAU/RAU procedures | ZTE | Revised |
C4‑081312 | GTP-C header for Echo and Version Not Supported messages | Nokia Siemens Networks | Agreed |
C4‑081313 | Error handling | Nokia Siemens Networks | Agreed |
C4‑081314 | LS on End Marker | Nokia Siemens Networks | Approved |
C4‑081315 | PMIP6 Binding Revocation Procedures. | Ericsson, Samsung | Revised |
C4‑081316 | 29.274 IE Conditionality Definition | Ericsson | Agreed |
C4‑081317 | 29.274 UDP/IP Protocol Stack Usage | Ericsson | Agreed |
C4‑081318 | 29.274 Update of Presence Requirement and Comprehension Required fields of S11 Create Bearer Response Messages | Ericsson | Revised |
C4‑081319 | Create Dedicated Bearer Message on GTP based S5S8 within the Dedicated Bearer Activation procedure | Huawei | Revised |
C4‑081320 | P-CR on Update bearer message for S1 release procedure | CATT | Agreed |
C4‑081321 | Create Default Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081322 | PMIP6 Tunnel Management Procedures | Ericsson | Revised |
C4‑081323 | NAI for non-3GPP Access | Nortel | Agreed |
C4‑081324 | Create Default Bearer Message on GTP based S5/S8 within the UE Requested PDN Connectivity procedure | Huawei | Revised |
C4‑081325 | Delete Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081326 | Delete Bearer Message on GTP based S5/S8 within the UE Requested PDN Disconnection procedure | Huawei | Agreed |
C4‑081327 | Delete Bearer Message on S11 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081328 | PMIP6 Binding Revocation Procedures. | Ericsson, Samsung, NTT DoCoMo | Agreed |
C4‑081329 | LS reply on transfer of TISPAN H.248 Items to 3GPP | Ericsson, Alcatel-Lucent | Revised |
C4‑081330 | Stage 2 Procedures Section for A interface over IP | LM Ericsson | Revised |
C4‑081331 | Stage 3 support for A interface over IP | LM Ericsson | Revised |
C4‑081332 | Call Establishment For A Interface user plan on IP with immediate MGW selection | Huawei | Revised |
C4‑081333 | BFCB Termination Configuration Procedures | LM Ericsson, Huawei | Agreed |
C4‑081334 | Clarification of MSRP configuration Procedure | LM Ericsson | Agreed |
C4‑081335 | Introduction of Stage 3 Procedure for Message Conference | LM Ericsson | Agreed |
C4‑081336 | Alignment of 3G Mp with TISPAN MRF | LM Ericsson | Agreed |
C4‑081337 | Alignment of SDP Usage | LM Ericsson | Agreed |
C4‑081338 | Alignment of SDP Usage | LM Ericsson | Agreed |
C4‑081339 | CAT TR Editorial corrections | Alcatel-Lucent | Agreed |
C4‑081340 | (29.882)Multimedia call flows in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑081341 | LS on H.248 Profile on I3 Interface for IMS Centralised Service Control | Ericsson | Approved |
C4‑081342 | Addition of IMS Centralized Services related identities | Vodafone, Orange | Agreed |
C4‑081343 | (29.882) CLIP, CLIR in CAT Server switch architecture with routing back to GMSC Server and (G)MSC Server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑081344 | CAT interaction with CAMEL services | Huawei | Withdrawn |
C4‑081345 | CAT interaction with Optimal routing | Huawei | Agreed |
C4‑081346 | Comparison of different alternatives for CAT | China mobile | Revised |
C4‑081347 | LS on New Sub-Domain for .3gppnetwork.org for IMS Centralised Services | Vodafone | Approved |
C4‑081348 | Proposed conclusion on the P-CSCF service interruption scenario in TR 23.820 | LM Ericsson | Agreed |
C4‑081349 | Use Of Release Bearer Procedure | LM Ericsson | Agreed |
C4‑081350 | Use Of Release Bearer Procedure | LM Ericsson | Agreed |
C4‑081351 | Use of IP Transport and UDP Properties in Local Control Descriptor | LM Ericsson | Agreed |
C4‑081352 | Use of IP Transport and UDP Properties in Local Control Descriptor | LM Ericsson | Agreed |
C4‑081353 | Use of IP Transport and UDP Properties in Local Control Descriptor | LM Ericsson | Agreed |
C4‑081354 | Protocol negociation result procedures between MSC Server and MGW | Nokia Siemens Networks | Agreed |
C4‑081355 | Clarification of several inconsistencies in procedure | Huawei | Agreed |
C4‑081356 | Correction of the inconsistencies in several procedures description | Huawei | Agreed |
C4‑081357 | WID on for IMS centralized services | Ericsson | Endorsed |
C4‑081358 | LS on Maintenance alignment of TISPAN Rel-2 29.433 with 29.228 and 29.229 in Rel-8 | Alcatel-Lucent | Revised |
C4‑081359 | LS on "Changes to the format of TMGI" | Huawei | Approved |
C4‑081360 | Revisions to WID for IMS protocol enhancements for corporate network access | Alcatel-Lucent/CT1 | Revised |
C4‑081361 | S6a Purge MS | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081362 | S6a Reset | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081363 | S6a Notification | Nokia Siemens Networks, Ericsson | Revised |
C4‑081364 | General Description | Huawei | Agreed |
C4‑081365 | CT-wide WID on enhancement of multimedia interworking between IM CN subsystem and Circuit Switched network | Huawei | Revised |
C4‑081366 | Protocol Specification and Implementation | Huawei | Agreed |
C4‑081367 | Adding the Deletion Notification of a Public Identity to the AS | Alcatel-Lucent | Postponed |
C4‑081368 | Revisions to WID for IMS protocol enhancements for corporate network access | Alcatel-Lucent/CT1 | Revised |
C4‑081369 | IMS Restoration Procedures WID | LM Ericsson | Agreed |
C4‑081370 | 3GPP TR 23.820 v1.3.0 | Ericsson | Agreed |
C4‑081371 | IMS AS Service Data Description for AS Interoperability - Modification of Defined Features | Alcatel-Lucent | Agreed |
C4‑081372 | IMS AS Service Data Description for AS Interoperability - A binary storage approach to defining IMS service data | Alcatel-Lucent | Agreed |
C4‑081373 | 3GPP TR 29.864 v0.4.0 | Alcatel-Lucnet | Agreed |
C4‑081374 | LS on CT impacts for eCall data | Ericsson | Revised |
C4‑081375 | Missing signal in process VLR_CCBS_Recall_Manager | LM Ericsson | Agreed |
C4‑081376 | Key choice correction | Nokia, Nokia Siemens Networks | Agreed |
C4‑081377 | interworking scenario with two IWFs | ZTE | Agreed |
C4‑081378 | IWF scenarios for EIR | Huawei | Agreed |
C4‑081379 | TR 29.805 v0.4.0 | Huawei | Agreed |
C4‑081380 | Information Elements of messages over S101 | Huawei | Revised |
C4‑081381 | Draft CR on DTMF interworking procedures in SIP-I based Nc | LM Ericsson | Revised |
C4‑081382 | LS OUT LS on specification of an invalid connection address for IPv4 and IPv6 | Ericsson | Revised |
C4‑081383 | Pseudo-CR on MGW Id and use of unspecified connection address | LM Ericsson | Revised |
C4‑081384 | Addition of SIP-I based Nc within the scope of TS 29.232 | Alcatel-Lucent | Agreed |
C4‑081385 | Revision of scope of TS 23.205 | Alcatel-Lucent | Agreed |
C4‑081386 | 23.231 Pseudo-CR on Mandatory support of IPv4 on SIP-I based Nc interface | Alcatel-Lucent | Revised |
C4‑081387 | Handling of precondition by the GMSC | Huawei | Revised |
C4‑081388 | Interaction with Call Hold | Huawei | Withdrawn |
C4‑081389 | Amendment & endorsement for RFC 4566 | Huawei | Revised |
C4‑081390 | Recommending early access bearer assignment procedure | Nokia Siemens Networks | Agreed |
C4‑081391 | Reply LS on Essential correction to the Initiate PDP Context Activation Response message | Alcatel-Lucent | Approved |
C4‑081392 | Removing GTPv0 support from R8 GTPv1 | Nokia Siemens Networks | Revised |
C4‑081393 | WID – Stage 3 for transfer of data during an emergency call | T-Mobile | Endorsed |
C4‑081394 | Create Default Bearer Message on GTP based S5/S8 within the UE Requested PDN Connectivity procedure | Huawei | Revised |
C4‑081395 | PBU/PBA cleanup | Samsung | Revised |
C4‑081396 | Delete Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081397 | PMIPv6 handling of multiple PDN connectivity | NTT DoCoMo, TeliaSonera | Revised |
C4‑081398 | Refining of PBU/PBA | Ericsson | Revised |
C4‑081399 | Static IP address allocation | Ericsson | Revised |
C4‑081400 | Reply to LS S3-080489 = C4-081222 on SAE interworking with Pre-REL8 system | Nokia Siemens Networks | Approved |
C4‑081401 | Delete Subscriber Data | Huawei, Nokia Siemens Networks | Agreed |
C4‑081402 | S6a Insert Subscriber Data | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081403 | PBU/PBA at PMIP Initial Binding Registration and DeRegistration procedure | Ericsson | Agreed |
C4‑081404 | New vendor specific option for PCO | Ericsson | Revised |
C4‑081405 | Delete Bearer Message on S11 within the EUTRAN Initial Attach procedure | Huawei | Revised |
C4‑081406 | Revisions to WID for IMS protocol enhancements for corporate network access | Alcatel-Lucent/CT1 | Endorsed |
C4‑081407 | Adding UE initiated disconnection from PDN | Nokia Siemens Networks, Nokia | Revised |
C4‑081408 | LS on Maintenance alignment of TISPAN Rel-2 29.433 with 29.228 and 29.229 in Rel-8 | Alcatel-Lucent | Approved |
C4‑081409 | Create Forwarding Tunnel messages across S11 interface | Huawei | Revised |
C4‑081410 | Information Elements of messages over S101 | Huawei | Revised |
C4‑081411 | TS 29.277 v0.2.0 | Nortel Network | Agreed |
C4‑081412 | 3GPP TS 29.276 v0.2.0 | Alcatel-Lucent | Agreed |
C4‑081413 | Pseudo-CR on PDN GW reallocation support on S6b in TS 29.273 | Telecom Italia, TeliaSonera, Qualcomm | Agreed |
C4‑081414 | 29.273 Information Elements for AAA interfaces | TeliaSonera | Agreed |
C4‑081415 | SWa Description | Nokia Siemens Networks, Nokia | Agreed |
C4‑081416 | Comparison of different alternatives for CAT | China mobile | Agreed |
C4‑081417 | S6b/H2 Procedures Description in TS 29.273 | Qualcomm Europe | Agreed |
C4‑081418 | TS 29273 v0.2.0 | Ericsson | Agreed |
C4‑081419 | LS on CT impacts for eCall data | Ericsson | Revised |
C4‑081420 | LS on A new Diameter Permanent Failure Code for Gx | TSG CT WG3 | Noted |
C4‑081421 | PMIP6 Tunnel Management Procedures | Ericsson | Agreed |
C4‑081422 | Refining of PBU/PBA | Ericsson | Agreed |
C4‑081423 | Static IP address allocation | Ericsson | Agreed |
C4‑081424 | New vendor specific option for PCO | Ericsson | Agreed |
C4‑081425 | Adding UE initiated disconnection from PDN | Nokia Siemens Networks, Nokia | Agreed |
C4‑081426 | PMIPv6 handling of multiple PDN connectivity | NTT DoCoMo, TeliaSonera | Agreed |
C4‑081427 | PBU/PBA cleanup | Samsung | Agreed |
C4‑081428 | 3GPP TS 29.275 v0.2.0 | NTT DoCoMo | Agreed |
C4‑081429 | 3GPP TS 29.803 v0.8.0 | Huawei | Agreed |
C4‑081430 | Pseudo-CR on Delete bearer messages across S11 interface during TAU/RAU procedure | ZTE | Agreed |
C4‑081431 | Pseudo-CR on Create bearer messages across S11 interface during TAU procedure | ZTE | Agreed |
C4‑081432 | Pseudo-CR on Create bearer messages across S4 interface during RAU procedure | ZTE | Agreed |
C4‑081433 | Pseudo-CR on Mobility management messages across S10 interface during Inter eNodeB handover with MME relocation procedure | ZTE | Agreed |
C4‑081434 | Fallback to GTPv1 mechanism | Nokia Siemens Networks | Agreed |
C4‑081435 | Update Bearer Message across S11 interface during TAU/RAU procedures | ZTE | Agreed |
C4‑081436 | 29.274 Update of Presence Requirement and Comprehension Required fields of S11 Create Bearer Response Messages | Ericsson | Agreed |
C4‑081437 | Create Dedicated Bearer Message on GTP based S5S8 within the Dedicated Bearer Activation procedure | Huawei | Agreed |
C4‑081438 | Create Default Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Agreed |
C4‑081439 | LS on CAT in the 3GPP CS domain | Alcatel-Lucent | Revised |
C4‑081440 | Delete Bearer Message on GTP based S5/S8 within the EUTRAN Initial Attach procedure | Huawei | Agreed |
C4‑081441 | Create Default Bearer Message on GTP based S5/S8 within the UE Requested PDN Connectivity procedure | Huawei | Agreed |
C4‑081442 | PBU/PBA cleanup | Samsung | Agreed |
C4‑081443 | Delete Bearer Message on S11 within the EUTRAN Initial Attach procedure | Huawei | Agreed |
C4‑081444 | 3GPP TS 29274 v0.3.0 | Nokia | Agreed |
C4‑081445 | A new Diameter Permanent Failure Code for Gx | Nokia Siemens Networks | Revised |
C4‑081446 | Comments on CT3's Diameter TR 29.909 v1.1.0 | Alcatel-Lucent, Camint | Agreed |
C4‑081447 | Create Forwarding Tunnel messages across S11 interface | Huawei | Revised |
C4‑081448 | LS on CT impacts for eCall data | Ericsson | Approved |
C4‑081449 | Handling of precondition by the GMSC | Huawei | Agreed |
C4‑081450 | LS on CAT in the 3GPP CS domain | Alcatel-Lucent | Approved |
C4‑081451 | CT-wide WID on enhancement of multimedia interworking between IM CN subsystem and Circuit Switched network | Huawei | Endorsed |
C4‑081452 | Information Elements of messages over S101 | Huawei | Agreed |
C4‑081453 | Create Forwarding Tunnel messages across S11 interface | Huawei | Agreed |
C4‑081454 | Update to WID for Support of (G)MSC-S – (G)MSC-S Nc Interface based on the SIP-I protocol | Vodafone | Agreed |
C4‑081455 | A new Diameter Permanent Failure Code for Gx | Nokia Siemens Networks | Revised |
C4‑081456 | 23.231 Mapping Table for SIP-I Procedures between the (G)MSC server and MGW | Vodafone | Revised |
C4‑081457 | Response LS on RAN3 requirements for GTPv2 | TSG RAN WG3 | Noted |
C4‑081458 | LS on E-UTRAN Identifiers | TSG RAN WG3 | Noted |
C4‑081459 | Handling of documents on parallel session | CT4 Vice Chair | - |
C4‑081460 | 29.231 Removal of requirement of support 29.415 | Ericsson | Revised |
C4‑081461 | LS reply on transfer of TISPAN H.248 Items to 3GPP | Ericsson, Alcatel-Lucent | Approved |
C4‑081462 | Removing GTPv0 support from R8 GTPv1 | Nokia Siemens Networks | Postponed |
C4‑081463 | A new Diameter Permanent Failure Code for Gx | Nokia Siemens Networks | Agreed |
C4‑081464 | A new Diameter Permanent Failure Code for Gx | Nokia Siemens Networks | Agreed |
C4‑081465 | S6a Notification | Nokia Siemens Networks, Ericsson | Agreed |
C4‑081466 | 3GPP TS 29.272 v0.2.0 | Huawei | Agreed |
C4‑081467 | Call Establishment For A Interface user plan on IP with immediate MGW selection | Huawei | Revised |
C4‑081468 | LS on Rejection of TFT filters | TSG CT WG3 | Postponed |
C4‑081469 | Draft CR on DTMF interworking procedures in SIP-I based Nc | LM Ericsson | Agreed |
C4‑081470 | 23.231 Mapping Table for SIP-I Procedures between the (G)MSC server and MGW | Vodafone | Revised |
C4‑081471 | Pseudo-CR on MGW Id and use of unspecified connection address | LM Ericsson | Agreed |
C4‑081472 | LS OUT LS on specification of an invalid connection address for IPv4 and IPv6 | Ericsson | Revised |
C4‑081473 | 23.231 Pseudo-CR on Mandatory support of IPv4 on SIP-I based Nc interface | Alcatel-Lucent | Agreed |
C4‑081474 | Amendment & endorsement for RFC 4566 | Huawei | Agreed |
C4‑081475 | 23.231 Mapping Table for SIP-I Procedures between the (G)MSC server and MGW | Vodafone | Agreed |
C4‑081476 | TR 29.882 v0.5.0 | China mobile | Agreed |
C4‑081477 | 3GPP TS 23.231 v1.2.0 | Vodafone | Agreed |
C4‑081478 | 3GPP TS 29.231 v1.2.0 | Ericsson | Agreed |
C4‑081479 | Stage 2 Procedures Section for A interface over IP | LM Ericsson | Revised |
C4‑081480 | Call Establishment For A Interface user plan on IP with immediate MGW selection | Huawei | Agreed |
C4‑081481 | Stage 2 Procedures Section for A interface over IP | LM Ericsson | Agreed |
C4‑081482 | Stage 3 support for A interface over IP | LM Ericsson | Agreed |
C4‑081483 | Reply LS on Enhancements for SRNS Relocation | Alcatel-Lucent | Approved |
C4‑081484 | LS OUT LS on specification of an invalid connection address for IPv4 and IPv6 | Ericsson | Approved |
C4‑081485 | 29.231 Removal of requirement of support 29.415 | Ericsson | Agreed |
C4‑081486 | Output Documents | Chairman | Noted |
C4‑081487 | Notes of Workplan | Chairman | - |
page generated from database: 2024-07-20 12:15:34