3GPP TDocs (written contributions) at meeting
Meeting: R1-68 - 2012-02-06 to 2012-02-10, Dresden
meeting id: R1-68 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑120000 | Draft Agenda for RAN1#68 meeting | RAN1 Chairman | Approved |
R1‑120001 | Final report of RAN1#67 meeting | MCC Support | Approved |
R1‑120002 | Selected highlights from RAN#54 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑120003 | Reply LS on Capability handling of LTE TDD and FDD modes | RAN, Qualcomm | Noted |
R1‑120004 | Response LS on MBMS FEC Evaluation Framework | RAN2, Qualcomm | Noted |
R1‑120005 | LS on Parallel transmissions of PRACH and PUSCH/PUCCH/SRS | RAN2, Alcatel-Lucent | Noted |
R1‑120006 | LS on DTX detection of PUCCH format 2 | RAN4, NTT DoCoMo | Noted |
R1‑120007 | LS response on Physical Layer measurement for network-based positioning | RAN4, Ericsson | Noted |
R1‑120008 | Email Discussion Summary on Coverage Issues Identification | China Telecom (Rapporteur) | Endorsed |
R1‑120009 | Draft LS response of MDT UL coverage use case | Huawei | Noted - Revised |
R1‑120010 | Draft LS reply on parallel transmissions of PRACH and PUSCH/PUCCH/SRS | Huawei | Noted - Revised |
R1‑120011 | Consideration on parallel transmissions of PRACH and PUSCH/PUCCH/SRS | Huawei, HiSilicon | Noted |
R1‑120012 | Simultaneous transmission of periodic CSI and HARQ-ACK | Huawei, HiSilicon | Not treated |
R1‑120013 | Multiple periodic CSI reporting in a subframe | Huawei, HiSilicon | Not treated |
R1‑120014 | Simultaneous transmission of SRS and periodic CSI | Huawei, HiSilicon | Not treated |
R1‑120015 | TxD scheme for format 1b with channel selection | Huawei, HiSilicon | Not treated |
R1‑120016 | Overhead analysis of TxD for PUCCH format 3 | Huawei, HiSilicon | Noted |
R1‑120017 | HARQ timing design for TDD inter-band CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑120018 | Cross-carrier scheduling design for TDD inter-band CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑120019 | Time- and frequency tracking on additional carrier types | Huawei, HiSilicon | Noted |
R1‑120020 | Downlink reference signals for additional carrier types | Huawei, HiSilicon | Noted |
R1‑120021 | Control signaling for additional carrier types | Huawei, HiSilicon | Not treated |
R1‑120022 | SRS on PUCCH-less carrier | Huawei, HiSilicon | Not treated |
R1‑120023 | Analysis of feasibility and standard impact of reduced power ABS | Huawei, HiSilicon | Noted |
R1‑120024 | Detailed design of network assisted cell detection | Huawei, HiSilicon | Withdrawn |
R1‑120025 | Rate matching around CRS of neighbor cells | Huawei, HiSilicon | Not treated |
R1‑120026 | Obtaining information of neighboring cells CRS | Huawei, HiSilicon | Not treated |
R1‑120027 | Overview of CSI and CQI feedback for CoMP | Huawei, HiSilicon | Not treated |
R1‑120028 | Inter-CSI-RS-resource feedback for CoMP^^ | Huawei, HiSilicon | Noted |
R1‑120029 | On CoMP with transmission modes 3 and 4 | Huawei, HiSilicon | Not treated |
R1‑120030 | Utilization of resource-restricted measurements for CoMP feedback | Huawei, HiSilicon | Not treated |
R1‑120031 | CQI feedback for CoMP | Huawei, HiSilicon | Not treated |
R1‑120032 | Resources for interference measurements | Huawei, HiSilicon | Not treated |
R1‑120033 | Management of CoMP measurement set | Huawei, HiSilicon | Noted |
R1‑120034 | Enhancements of DL DMRS for CoMP | Huawei, HiSilicon | Noted |
R1‑120035 | CSI-RS sequence | Huawei, HiSilicon | Noted |
R1‑120036 | Configuration of CSI-RS | Huawei, HiSilicon | Noted |
R1‑120037 | Signalling requirements for PDSCH mapping for DL CoMP | Huawei, HiSilicon | Not treated |
R1‑120038 | Enhancements of uplink DMRS for UL CoMP | Huawei, HiSilicon | Not treated |
R1‑120039 | Enhancements of SRS for UL CoMP | Huawei, HiSilicon | Not treated |
R1‑120040 | Virtual propagation loss for UL CoMP power control | Huawei, HiSilicon | Not treated |
R1‑120041 | Uplink power control design for CoMP | Huawei, HiSilicon | Not treated |
R1‑120042 | Uplink Control Access and Transmission | Huawei, HiSilicon | Not treated |
R1‑120043 | Discussion on PUCCH enhancements | Huawei, HiSilicon | Noted |
R1‑120044 | Uplink timing advance for CoMP | Huawei, HiSilicon | Not treated |
R1‑120045 | DMRS sequences for ePDCCH | Huawei, HiSilicon | Revised |
R1‑120046 | Distributed transmission for ePDCCH | Huawei, HiSilicon | Noted |
R1‑120047 | Multiplexing of ePDCCH and PDSCH | Huawei, HiSilicon | Noted |
R1‑120048 | Search space design for ePDCCH | Huawei, HiSilicon | Noted |
R1‑120049 | Multiplexing of different DCI messages | Huawei, HiSilicon | Noted |
R1‑120050 | Discussion on CSI feedback for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑120051 | Bandwidth reduction for low cost MTC UE and text proposal | Huawei, HiSilicon, CMCC | Noted |
R1‑120052 | Analysis on low-cost MTC UE with a single receive chain | Huawei, HiSilicon | Not treated |
R1‑120053 | Reducing peak rate and transmission modes for low-cost MTC UE | Huawei, HiSilicon, CMCC | Noted |
R1‑120054 | Transmission power reduction for low cost MTC UE and text proposal | Huawei, HiSilicon | Not treated |
R1‑120055 | Consideration on HD-FDD for low-cost MTC UE | Huawei, HiSilicon | Not treated |
R1‑120056 | Analysis on traffic model and characteristics for MTC and text proposal | Huawei, HiSilicon | Agreed |
R1‑120057 | Text proposal for evaluation methodology | Huawei, HiSilicon | Noted |
R1‑120058 | Evaluation of LTE coverage limitations | Huawei, HiSilicon | Noted |
R1‑120059 | Evaluation of TDD traffic adaptive DL-UL reconfiguration in isolated cell scenario | Huawei, HiSilicon | Not treated |
R1‑120060 | Views on dual mode capable terminals | Ericsson/ST-Ericsson | Noted |
R1‑120061 | Draft CR capturing MTA decisions in 36.213 | Ericsson/ST-Ericsson | Noted |
R1‑120062 | void | - | Withdrawn |
R1‑120063 | On PDCCH enhancements for CA based HetNet | Ericsson/ST-Ericsson | Not treated |
R1‑120064 | On the use of aperiodic and periodic CSI feedback and the impact on periodic CSI dropping | Ericsson/ST-Ericsson | Not treated |
R1‑120065 | Periodic CSI multiplexed with CA A/N on PUCCH | Ericsson/ST-Ericsson | Not treated |
R1‑120066 | Further details on design principle for a CRS-free additional carrier type | Ericsson/ST-Ericsson | Not treated |
R1‑120067 | On the need for TxD for PUCCH Format 1b with Channel Selection | Ericsson/ST-Ericsson | Not treated |
R1‑120068 | On the need for TxD for PUCCH Format 3 | Ericsson/ST-Ericsson | Not treated |
R1‑120069 | Further evaluations of TxD schemes for PUCCH format 3 | Ericsson/ST-Ericsson | Not treated |
R1‑120070 | Remaining issues in general frame work for aggregation of carriers with different UL/DL configurations | Ericsson/ST-Ericsson | Not treated |
R1‑120071 | Enhanced Control Channels in aggregation of carriers with different UL/DL configurations | Ericsson/ST-Ericsson | Withdrawn |
R1‑120072 | Cross-carrier scheduling in aggregation of carriers with different UL/DL configurations | Ericsson/ST-Ericsson | Not treated |
R1‑120073 | Synchronization performance on additional carrier types | Ericsson/ST-Ericsson | Noted |
R1‑120074 | Main scenarios and use cases for additional carrier types | Ericsson/ST-Ericsson | Not treated |
R1‑120075 | Power scaling due to multiple TA values | Ericsson/ST-Ericsson | Noted |
R1‑120076 | On Reference Signal design for enhanced control channels | Ericsson/ST-Ericsson | Noted |
R1‑120077 | On multiplexing of PDSCH with enhanced control channels | Ericsson/ST-Ericsson | Noted |
R1‑120078 | On multiplexing of DCI messages | Ericsson/ST-Ericsson | Not treated |
R1‑120079 | Views on enhanced PHICH | Ericsson/ST-Ericsson | Not treated |
R1‑120080 | Summary of email discussion on FS_LTE_TDD_eIMTA | Email discussion rapporteur (CATT) | Not treated |
R1‑120081 | Overview of HSPA feedback and signaling efficiency enhancements for LCR TDD | CATT | Noted |
R1‑120082 | System level evaluation on compact DCI formats | CATT | Not treated |
R1‑120083 | Enhancements on PDCCH search space for CA-capable UEs | CATT | Not treated |
R1‑120084 | Impact on DL throughput with Rel-10 periodic CSI feedback | CATT | Not treated |
R1‑120085 | Discussions on multi-CC periodic CSI reporting in LTE-A Rel-11 | CATT | Not treated |
R1‑120086 | Simultaneous transmission of ACK/NAK and periodic CSI in Rel-11 | CATT | Not treated |
R1‑120087 | Enhancements on UL ACK/NAK in Rel-11 carrier aggregation | CATT | Not treated |
R1‑120088 | Transmit diversity for PUCCH format 1b with channel selection | CATT | Noted |
R1‑120089 | PUCCH format 3 overhead analysis | CATT | Noted |
R1‑120090 | Transmit diversity for PUCCH format 3 | CATT | Not treated |
R1‑120091 | TDD inter-band carrier aggregation | CATT | Not treated |
R1‑120092 | Support of multiple timing advances in LTE-A Rel-11 with CA | CATT | Not treated |
R1‑120093 | UL power control with multiple timing advances in Rel-11 | CATT | Noted |
R1‑120094 | Discussion on inter-CSI-RS-resource feedback | CATT | Noted |
R1‑120095 | Discussion on aggregated feedback | CATT | Not treated |
R1‑120096 | CQI definition for CoMP | CATT | Not treated |
R1‑120097 | CQI definition for TDD CoMP | CATT | Not treated |
R1‑120098 | Feedback mechanism for CoMP | CATT | Not treated |
R1‑120099 | Discussion on interference measurement resources | CATT | Not treated |
R1‑120100 | Consideration on interference measurement | CATT | Not treated |
R1‑120101 | CoMP measurement set and RRM measurement | CATT | Noted |
R1‑120102 | UE-specific DM-RS configuration | CATT | Noted |
R1‑120103 | Consideration on CSI-RS sequence | CATT | Noted |
R1‑120104 | Discussion on CSI-RS configuration | CATT | Noted |
R1‑120105 | On downlink control signaling for CoMP | CATT | Not treated |
R1‑120106 | Further details on UE-specific UL DMRS | CATT | Not treated |
R1‑120107 | SRS enhancement for CoMP | CATT | Not treated |
R1‑120108 | Uplink power control for CoMP | CATT | Not treated |
R1‑120109 | Link level evaluation on E-PDCCH transmission schemes | CATT | Not treated |
R1‑120110 | Considerations on E-PDCCH multiplexing with PDSCH | CATT | Noted |
R1‑120111 | Design of E-PDCCH search space | CATT | Noted |
R1‑120112 | Considerations on multiplexing of different DCIs | CATT | Noted |
R1‑120113 | PUCCH resource for E-PDCCH | CATT | Not treated |
R1‑120114 | Discussion on the bandwidth reduction for low cost MTC UEs | CATT | Noted |
R1‑120115 | Discussion on the single receive RF chain for low cost MTC LTE UEs | CATT | Not treated |
R1‑120116 | Considerations on the necessity of HARQ for low cost MTC LTE UEs | CATT | Noted |
R1‑120117 | Discussion on the evaluation assumptions for low cost MTC LTE UEs | CATT | Not treated |
R1‑120118 | Evaluation on TDD UL-DL reconfiguration for isolated Pico scenario | CATT | Not treated |
R1‑120119 | TR skeleton of Rel-11 FS_LTE_TDD_eIMTA | CATT | Not treated |
R1‑120120 | Discussion on inter-CSI-RS-resource feedback for DL CoMP | CHTTL | Noted |
R1‑120121 | 36.212 CR0132 (Rel-10, F) Corrections on payload size adjustment for DCI format 1 and 1A | Huawei, HiSilicon, ZTE, Fujitsu, Texas Instruments, Ericsson, ST-Ericsson | Noted - Revised |
R1‑120122 | Motivations on UL signalling enhancement | Huawei, HiSilicon | Not treated |
R1‑120123 | Discussion on UL control signalling transmission with multiple TAs | Huawei, HiSilicon | Noted |
R1‑120124 | Aggregated CSI feedback for CoMP | Huawei, HiSilicon | Not treated |
R1‑120125 | PHICH enhancement for CoMP Scenario 4 | Huawei, HiSilicon | Not treated |
R1‑120126 | CQI feedback enhancement for CoMP | Sony Corporation | Not treated |
R1‑120127 | CQI enhancement for MU-MIMO in scenario A and C | Sony Corporation | Not treated |
R1‑120128 | DL throughput performance results with CSI dropping and A-CSI | InterDigital Communications, LLC | Not treated |
R1‑120129 | Design consideration for R11 TDD inter-band CA | InterDigital Communications, LLC | Not treated |
R1‑120130 | Simultaneous UL transmissions in presence of R11 Multiple TA | InterDigital Communications, LLC | Not treated |
R1‑120131 | CQI definition for DPS with NFB traffic | InterDigital Communications, LLC | Withdrawn |
R1‑120132 | On Interference Measurement for Rel-11 | InterDigital Communications, LLC | Withdrawn |
R1‑120133 | Management of CoMP measurement set | InterDigital Communications, LLC | Not treated |
R1‑120134 | DM-RS sequence for CoMP | InterDigital Communications, LLC | Noted |
R1‑120135 | CSI-RS sequence for CoMP | InterDigital Communications, LLC | Noted |
R1‑120136 | CSI-RS configuration for CoMP | InterDigital Communications, LLC | Noted |
R1‑120137 | UL power control for CoMP with NFB traffic | InterDigital Communications, LLC | Noted |
R1‑120138 | Reference Signals for ePDCCH | InterDigital Communications, LLC | Noted |
R1‑120139 | On ePDCCH Multiplexing in Rel-11 | InterDigital Communications, LLC | Noted |
R1‑120140 | On Search Space Design for ePDCCH in Rel-11 | InterDigital Communications, LLC | Noted |
R1‑120141 | Consideration on ePHICH in Rel-11 | InterDigital Communications, LLC | Not treated |
R1‑120142 | Evaluation results for DL coverage impacts with Single Rx Low-Cost UE's | InterDigital Communications, LLC | Not treated |
R1‑120143 | Evaluation of power consumption reduction impacts for Low-Cost MTC techniques | InterDigital Communications, LLC | Not treated |
R1‑120144 | GSM/(E)GPRS reference link budgets for MTC services | InterDigital Communications, LLC | Noted |
R1‑120145 | Improving LTE UL coverage for VoIP | InterDigital Communications, LLC | Noted |
R1‑120146 | 36.212 CR0133 (Rel-10, F) Correction for two HARQ-ACK bit on PUSCH with CA | Samsung | Noted - Revised |
R1‑120147 | Draft CR TS36.211 (Rel-10, F) Correction for subframes on a carrier not supporting PDSCH | Samsung | Noted |
R1‑120148 | DL Throughput Gains from a Compact UL DCI Format | Samsung | Not treated |
R1‑120149 | HARQ-ACK and Periodic CSI Multiplexing | Samsung | Not treated |
R1‑120150 | CSI Reporting Period and Overhead Considerations | Samsung | Not treated |
R1‑120151 | Multi-Cell Periodic CSI Reporting in a PUCCH | Samsung | Not treated |
R1‑120152 | TDD HARQ-ACK Bundling for PUCCH Format 3 | Samsung | Not treated |
R1‑120153 | HARQ-ACK feedback Enhancement for TDD configuration 5 | Samsung | Not treated |
R1‑120154 | HARQ-ACK Bundling in PUSCH for DL CA | Samsung | Not treated |
R1‑120155 | UL DAI Field for DL CA in FDD | Samsung | Not treated |
R1‑120156 | Resource allocation for PUCCH format 1b with Channel selection in TDD | Samsung | Not treated |
R1‑120157 | TxD for PUCCH Format 1b with Channel Selection | Samsung | Not treated |
R1‑120158 | UL HARQ-ACK timing for TDD CA | Samsung | Noted |
R1‑120159 | DL HARQ-ACK timing for TDD CA | Samsung | Not treated |
R1‑120160 | Cross-carrier scheduling of PUSCH for TDD CA | Samsung | Not treated |
R1‑120161 | Need for cross-carrier scheduling in Rel-11 TDD CA | Samsung | Not treated |
R1‑120162 | Cross subframe scheduling for TDD CA | Samsung | Not treated |
R1‑120163 | Time and frequency tracking on new carrier type | Samsung | Noted |
R1‑120164 | Power limitation in case of multiple TA | Samsung | Withdrawn |
R1‑120165 | Restriction on DL Tx power control range in non-zero Tx power ABS | Samsung | Withdrawn |
R1‑120166 | Pa and Pb in non-zero Tx power ABS | Samsung | Not treated |
R1‑120167 | RNTP in non-zeroTx power ABS | Samsung | Noted |
R1‑120168 | Discussion on further enhanced non-CA-based ICIC | Samsung | Not treated |
R1‑120169 | CSI Feedback Mechanism for CoMP | Samsung | Not treated |
R1‑120170 | Discussion on the Definition of CQI in CoMP | Samsung | Not treated |
R1‑120171 | Interference Measurement Resource for DL CoMP | Samsung | Not treated |
R1‑120172 | Discussion on the Size of CoMP Measurement Set for CSI Feedback | Samsung | Not treated |
R1‑120173 | Discussions on measurements based on CSI-RS | Samsung | Noted |
R1‑120174 | DMRS Scrambling for DL CoMP | Samsung | Not treated |
R1‑120175 | CSI-RS Scrambling for DL CoMP | Samsung | Noted |
R1‑120176 | CSI-RS Configuration for DL CoMP | Samsung | Noted |
R1‑120177 | Downlink power control allocation for CoMP | Samsung | Not treated |
R1‑120178 | Downlink Control Signaling for CoMP | Samsung | Not treated |
R1‑120179 | Further discussions on enhanced UL DM RS for UL CoMP | Samsung | Not treated |
R1‑120180 | SRS Enhancements | Samsung | Not treated |
R1‑120181 | Discussions on the UL PC alternatives for UL CoMP | Samsung | Not treated |
R1‑120182 | UL PC design for UL CoMP | Samsung | Not treated |
R1‑120183 | SRS Transmission Power Control | Samsung | Noted |
R1‑120184 | PUCCH transmissions for UL CoMP | Samsung | Noted |
R1‑120185 | Timing advance for UL CoMP | Samsung | Not treated |
R1‑120186 | DMRS based E-PDCCH Transmission Schemes | Samsung | Noted |
R1‑120187 | Further discussion on E-PDCCH structure | Samsung | Not treated |
R1‑120188 | DMRS scrambling for enhanced control channels | Samsung | Not treated |
R1‑120189 | E-PDCCH Multiplexing with PDSCH | Samsung | Not treated |
R1‑120190 | Search Space Design for E-PDCCHs | Samsung | Not treated |
R1‑120191 | Multiplexing of Multiple E-PDCCHs for Distributed and Localized Transmissions | Samsung | Noted |
R1‑120192 | Functionalities of DL Enhanced Control Channels | Samsung | Not treated |
R1‑120193 | HARQ-ACK Transmission in Response to E-PDCCH Detection | Samsung | Not treated |
R1‑120194 | Analysis of reduction of maximum bandwidth for low cost MTC UE | Samsung | Not treated |
R1‑120195 | Analysis of signle receive RF chain for low cost MTC UE | Samsung | Not treated |
R1‑120196 | Performance evaluation of dynamic TDD reconfiguration | Samsung | Not treated |
R1‑120197 | Analysis of interference measurements approaches for Release-11 | Intel Corporation | Not treated |
R1‑120198 | Discussion on aggregated CQI feedback for JT CoMP | Intel Corporation | Not treated |
R1‑120199 | Discussion on the management of CoMP measurement set | Intel Corporation | Not treated |
R1‑120200 | Discussion on CQI definition for CoMP systems | Intel Corporation | Not treated |
R1‑120201 | Discussion on X2 interface support for CoMP schemes | Intel Corporation | Not treated |
R1‑120202 | Downlink control signaling for DL CoMP | Intel Corporation | Not treated |
R1‑120203 | Performance analysis of per CSI-RS resource feedback for JT CoMP | Intel Corporation | Noted |
R1‑120204 | DM-RS Enhancements for UL CoMP | Intel Corporation | Revised |
R1‑120205 | UL CoMP SRS Enhancements for Homogeneous Networks | Intel Corporation | Not treated |
R1‑120206 | A Signaling Framework for UL CoMP | Intel Corporation | Not treated |
R1‑120207 | Discussion on HARQ feedback of TDD Inter-band Carrier Aggregation | Intel Corporation | Not treated |
R1‑120208 | Open issues of CA for different TDD UL-DL configurations | Intel Corporation | Not treated |
R1‑120209 | Analysis of LTE TDD traffic adaptation in isolated Pico cell scenario | Intel Corporation | Not treated |
R1‑120210 | Performance evaluation of cost reduction strategies for low-cost MTC UEs based on LTE | Intel Corporation | Not treated |
R1‑120211 | Coverage analysis of LTE UL physical channels | Intel Corporation | Noted |
R1‑120212 | Evaluation/analysis of reduction of maximum bandwidth for low-cost MTC | Ericsson, ST-Ericsson | Noted |
R1‑120213 | Evaluation/analysis of single receive RF chain for low-cost MTC | Ericsson, ST-Ericsson | Not treated |
R1‑120214 | Evaluation/analysis of reduction of peak rate for low-cost MTC | Ericsson, ST-Ericsson | Not treated |
R1‑120215 | Evaluation/analysis of reduction of transmit power for low-cost MTC | Ericsson, ST-Ericsson | Not treated |
R1‑120216 | Evaluation/analysis of half duplex operation for low-cost MTC | Ericsson, ST-Ericsson | Not treated |
R1‑120217 | Discussion on "LS on Parallel transmissions of PRACH and PUSCH/PUCCH/SRS" | Panasonic | Noted |
R1‑120218 | Enhancement of periodic CSI for carrier aggregation | Panasonic | Not treated |
R1‑120219 | Views on open issues on inter-band CA with different TDD UL-DL configurations | Panasonic | Not treated |
R1‑120220 | Channels and signals for additional carrier type | Panasonic | Not treated |
R1‑120221 | Simultaneous transmissions in multiple TA | Panasonic | Noted |
R1‑120222 | Signalling support for CRS interference handling in low power ABS | Panasonic | Not treated |
R1‑120223 | Potential issues regarding low power ABS | Panasonic | Not treated |
R1‑120224 | CQI definition for CoMP | Panasonic | Not treated |
R1‑120225 | Interference Measurement for Flexible CoMP Operations in Rel-11 | Panasonic | Not treated |
R1‑120226 | CoMP Measurement Set Management | Panasonic | Noted |
R1‑120227 | DMRS sequence design | Panasonic | Noted |
R1‑120228 | Discussion on CSI-RS configuration for CoMP | Panasonic | Noted |
R1‑120229 | UE-specific base sequence assignment for UL CoMP | Panasonic | Noted |
R1‑120230 | Enhancement of PUSCH DMRS orthogonality | Panasonic | Not treated |
R1‑120231 | Discussion of power control for UL CoMP | Panasonic | Not treated |
R1‑120232 | Enhancement of control signaling for UL CoMP | Panasonic | Noted |
R1‑120233 | CoMP uplink timing advance | Panasonic | Not treated |
R1‑120234 | Reference signal for enhanced PDCCH | Panasonic | Not treated |
R1‑120235 | Multiplexing between ePDCCH and PDSCH | Panasonic | Not treated |
R1‑120236 | Search space design for enhanced PDCCH | Panasonic | Not treated |
R1‑120237 | Multiplexing of ePDCCHs and ePDCCH RE mapping | Panasonic | Not treated |
R1‑120238 | E-PDCCH performance analysis on FDM and FDM+TDM with Tx-diversity | Panasonic | Noted |
R1‑120239 | Performance evaluation of different DL peak rates | Panasonic | Not treated |
R1‑120240 | Performance evaluation of different number fo Rx antennas | Panasonic | Not treated |
R1‑120241 | Specification Impact of Non-Zero Power ABS | Hitachi Ltd. | Not treated |
R1‑120242 | Consideration on CSI Feedback for JT CoMP | Hitachi Ltd. | Not treated |
R1‑120243 | CQI Definition for CoMP | Hitachi Ltd. | Not treated |
R1‑120244 | Discussion on RRM/CoMP Measurement Set Management | Hitachi Ltd. | Noted |
R1‑120245 | DL DMRS Enhancement for CoMP | Hitachi Ltd. | Not treated |
R1‑120246 | Solution for different numbers of UL-DL configurations on different bands | NEC Group | Not treated |
R1‑120247 | Discussion on time and frequency synchronisation for the Additional Carrier type | NEC Group | Noted |
R1‑120248 | Frame timing and SFN of "unsynchronized" additional carrier | NEC Group | Not treated |
R1‑120249 | Design consideration for additional carrier type | NEC Group | Not treated |
R1‑120250 | Signaling support for non-zero transmission power ABS | NEC Group | Revised |
R1‑120251 | Observations on RRM measurement and Rel-8 CRS-based feedback for CoMP scenario 4 TDD system | NEC Group | Not treated |
R1‑120252 | Discussion on interference measurement for CoMP | NEC Group | Not treated |
R1‑120253 | Decision methods of CoMP measurement set and reporting set | NEC Group | Not treated |
R1‑120254 | E-PDCCH design aspects related to reference signals | NEC Group | Not treated |
R1‑120255 | E-PDCCH multiplexing with PDSCH | NEC Group | Not treated |
R1‑120256 | Search space design for E-PDCCH | NEC Group | Noted |
R1‑120257 | DCI Multiplexing for E-PDCCH | NEC Group | Noted |
R1‑120258 | ePDCCH with JT/DPS CoMP | NEC Group | Not treated |
R1‑120259 | Maximum bandwidth reduction for low-cost MTC UE based on LTE | NEC Group | Noted |
R1‑120260 | Evaluation results of LTE TDD for DL-UL Interference Management and Traffic Adaptation | NEC Group | Not treated |
R1‑120261 | Possible difference of UE capabilities and FGI setting between FDD and TDD modes for dual duplex mode UEs | HTC | Withdrawn |
R1‑120262 | Construction and usage of additional carriers | HTC | Not treated |
R1‑120263 | Flexible DL DM-RS Configuration for CoMP | HTC | Not treated |
R1‑120264 | Enhancements for CoMP Scenario 3 Uplink Power Control | HTC | Revised |
R1‑120265 | Discussion on Reference Signals for Enhanced PDCCH | HTC | Not treated |
R1‑120266 | E-PDCCH Design Considerations on Multiplexing with PDSCH | HTC | Not treated |
R1‑120267 | Search Space Design for E-PDCCH | HTC | Not treated |
R1‑120268 | Discussion on Multiplexing of Different DCI Messages | HTC | Noted |
R1‑120269 | Reduction of maximum bandwidth for low-cost MTC UEs | HTC | Not treated |
R1‑120270 | Reduction of peak data rate for low-cost MTC UEs | HTC | Noted |
R1‑120271 | On the Configuration and Usage of New Carrier Types | Apple Inc. | Not treated |
R1‑120272 | Scrambling Sequences for Enhanced PDCCH | Apple Inc. | Not treated |
R1‑120273 | Multiplexing of ePDCCH with PDCCH and PDSCH | Apple Inc. | Not treated |
R1‑120274 | PDSCH HARQ-ACK report with LTE TDD inter-band CA | Sharp | Not treated |
R1‑120275 | Performance evaluation of JT CoMP with inter-CSI-RS feedback | Sharp | Noted |
R1‑120276 | DL DMRS enhancement for CoMP | Sharp | Not treated |
R1‑120277 | DMRS enhancements for UL-CoMP | Sharp | Revised |
R1‑120278 | TPC enhancements for UL-CoMP | Sharp | Not treated |
R1‑120279 | Configuration of UE-specific RS for ePDCCH | Sharp | Noted |
R1‑120280 | Common search space design for ePDCCH | Sharp | Not treated |
R1‑120281 | Partitioning of PRB pair and eCCE structure | Sharp | Not treated |
R1‑120282 | Performance evaluaiton of TDD subframe reconfiguration in isolated-cell | ZTE | Not treated |
R1‑120283 | Views on open issues for inter-band CA with different TDD UL-DL configurations | ZTE | Not treated |
R1‑120284 | Consideration on PDSCH rate matching around CRS of neighbour cells | ZTE | Not treated |
R1‑120285 | On signalling for reduced power ABS | ZTE | Not treated |
R1‑120286 | Consideration on issues related to multiple TA | ZTE | Not treated |
R1‑120287 | Discussion of parallel transmissions of PRACH on SCell and UL transmissions on other cell | ZTE | Noted |
R1‑120288 | Consideration for uplink power control in UL CoMP | ZTE | Revised |
R1‑120289 | Discussion on Synchronization on Additional Carrier Types | ZTE | Noted |
R1‑120290 | TP for evaluation/analysis of reduction of maximum bandwidth | ZTE | Noted |
R1‑120291 | TP for evaluation/analysis of single receive RF chain | ZTE | Not treated |
R1‑120292 | TP for evaluation/analysis of reduction of peak rate | ZTE | Noted |
R1‑120293 | TP for evaluation/analysis of reduction of transmit power | ZTE | Not treated |
R1‑120294 | Discussion on enhancement for periodic CSI | ZTE | Revised |
R1‑120295 | Support of simultaneous transmission for periodic CSI and HARQ-ACK | ZTE | Not treated |
R1‑120296 | Transmit diversity for PUCCH format 1b with channel selection | ZTE | Not treated |
R1‑120297 | Overhead analysis for PUCCH Format 3 Transmit Diversity | ZTE | Not treated |
R1‑120298 | Evaluation of inter-CSI-RS-resource feedback for CoMP | ZTE | Noted |
R1‑120299 | Evaluation of aggregated feedback for CoMP | ZTE | Not treated |
R1‑120300 | Consideration on CoMP support based on CRS | ZTE | Not treated |
R1‑120301 | Discussion on CQI definition for CoMP | ZTE | Not treated |
R1‑120302 | Evaluation and discussion on interference measurement enhancement | ZTE | Not treated |
R1‑120303 | Discussion on CoMP Measurement Set and RRM Measurement Set | ZTE | Not treated |
R1‑120304 | Initialization for DMRS in CoMP | ZTE | Not treated |
R1‑120305 | Further enhancement for DMRS orthogonality | ZTE | Not treated |
R1‑120306 | The issues on CSI-RS sequence in CoMP | ZTE | Noted |
R1‑120307 | CSI-RS configuration in CoMP | ZTE | Noted |
R1‑120308 | Downlink control signaling for CoMP | ZTE | Not treated |
R1‑120309 | Considerations on the enhancement for SRS | ZTE | Not treated |
R1‑120310 | Uplink DMRS enhancement for UL CoMP | ZTE | Noted |
R1‑120311 | Consideration for PUCCH enhancement for CoMP | ZTE | Noted |
R1‑120312 | Discussion on DM-RS based enhanced PDCCH transmission | ZTE | Noted |
R1‑120313 | Consideration on enhanced PDCCH structure | ZTE | Not treated |
R1‑120314 | Search space design for enhanced PDCCH | ZTE | Not treated |
R1‑120315 | 36.212 Draft CRxxxx (Rel-10, F) Format 1A size ambiguity in random access | ZTE | Noted - Revised |
R1‑120316 | View on open questions for CA with different TDD configuration | Pantech | Not treated |
R1‑120317 | Issues on parallel transmission in multiple TA environments | Pantech | Not treated |
R1‑120318 | Simultaneous transmission in multiple TA | Pantech | Noted |
R1‑120319 | UE side measurement and reporting for CoMP measurement set control | Pantech | Not treated |
R1‑120320 | DL DM-RS enhancements for Rel-11 | Pantech | Not treated |
R1‑120321 | Enhancements on CSI-RS sequence for CoMP | Pantech | Noted |
R1‑120322 | Multiple CSI-RS Resource Configuration for CoMP | Pantech | Noted |
R1‑120323 | DCI content to support CoMP | Pantech | Not treated |
R1‑120324 | UL DM-RS enhancements for Rel-11 | Pantech | Not treated |
R1‑120325 | SRS enhancement for UL CoMP | Pantech | Not treated |
R1‑120326 | PUCCH enhancement for UL CoMP | Pantech | Noted |
R1‑120327 | DM RS resource configuration for E-PDCCH | Pantech | Noted |
R1‑120328 | Views on enhanced PHICH | Pantech | Not treated |
R1‑120329 | PUCCH resource allocation for E-PDCCH | Pantech | Not treated |
R1‑120330 | Search Space Design for E-PDCCH | Research In Motion UK Limited | Not treated |
R1‑120331 | Multiplexing of Different DCI Messages | Research In Motion UK Limited | Noted |
R1‑120332 | Further Discussion on Reference Signals for E-PDCCH | Research In Motion UK Limited | Noted |
R1‑120333 | Unified FDD/TDD Transmit Diversity for Channel Selection | Research In Motion UK Limited | Not treated |
R1‑120334 | Signaling enhancements to support non-zero transmit power in ABS operation | Research In Motion UK Limited | Not treated |
R1‑120335 | Clarification on PUSCH transmission overlapped with cell-specific ^^SRS bandwidth | Research In Motion UK Limited | Noted |
R1‑120336 | Design of HARQ and Scheduling Timing Linkage to Support Inter-band CA with Different TDD Configurations | Research In Motion UK Limited | Not treated |
R1‑120337 | Cost analysis of cost reduction techniques for LTE MTC Ues | MStar Semiconductor, Inc. | Noted |
R1‑120338 | On timing delay and supported configurations for multi-flow HSDPA transmissions | Ericsson/ST-Ericsson | Noted |
R1‑120339 | HS-DPCCH quality for MF-HSDPA transmissions | Ericsson/ST-Ericsson | Noted |
R1‑120340 | Performance evaluation of MIMO for MF-HSDPA | Ericsson/ST-Ericsson | Noted |
R1‑120341 | Precoder Design for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑120342 | Design Aspects for Uplink Higher Order Modulation | Ericsson/ST-Ericsson | Noted |
R1‑120343 | Design Aspects for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑120344 | Quality control of the secondary stream for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑120345 | On the design of uplink control channels for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑120346 | Downlink physical channel design for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑120347 | Time plan and simulation assumptions for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted - Revised |
R1‑120348 | TTI allignment between CELL_FACH Uss and CELL_FACH and CELL_DCH Ues | Ericsson/ST-Ericsson | Noted |
R1‑120349 | System performance of TDM operation in CELL_FACH state | Ericsson/ST-Ericsson | Noted |
R1‑120350 | On the support of 2 ms per HARQ activation of grants and TTI alignment between CELL_FACH UEs and CELL_FACH and CELL_DCH Ues | Ericsson/ST-Ericsson, Orange, AT&T, SOFTBANK MOBILE, Telefonica | Noted |
R1‑120351 | Initial E-DCH TTI selection to support concurrent deployment of 2ms and 10ms TTI in CELL_FACH | Ericsson, ST-Ericsson | Withdrawn |
R1‑120352 | Common Pilot Design for Four branch MIMO System | Ericsson/ST-Ericsson | Revised |
R1‑120353 | Impact of Common Pilot gating on the Four branch MIMO link performance | Ericsson | Noted |
R1‑120354 | Achievable Gains with Dedicated Pilots in a Four branch MIMO System | Ericsson/ST-Ericsson | Revised |
R1‑120355 | Dedicated Pilot Performance in four branch MIMO system | Ericsson | Withdrawn |
R1‑120356 | Data Bundling in 2 codeword MIMO System | Ericsson | Noted |
R1‑120357 | Layer Mapping Methods for a 2 codeword MIMO System | Ericsson | Noted |
R1‑120358 | Impact of CSI errors on the link performance for four branch MIMO System | Ericsson | Withdrawn |
R1‑120359 | Number of HARQ process for Rank 2 in a four branch MIMO System | Ericsson/ST-Ericsson | Revised |
R1‑120360 | Layer mapping technques in the Precoder design | Ericsson | Withdrawn |
R1‑120361 | Feedback Channel Design for Four branch MIMO System | Ericsson | Noted |
R1‑120362 | Separation of physical layer capabilities and FGI for FDD and TDD | Renesas Mobile Europe Ltd | Not treated |
R1‑120363 | Discussion on 4 branch MIMO codeword to layer mapping | Renesas Mobile Europe Ltd | Noted |
R1‑120364 | Link level performance of 4x2 MIMO with feedback quantization | Renesas Mobile Europe Ltd | Noted |
R1‑120365 | Discussion on multiflow uplink control timing | Renesas Mobile Europe Ltd | Noted |
R1‑120366 | On HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 | Renesas Mobile Europe Ltd | Not treated |
R1‑120367 | On Encoding for HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 | Renesas Mobile Europe Ltd | Not treated |
R1‑120368 | HARQ Procedure for Full Duplex Mode in CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑120369 | HARQ Issues for Half Duplex Mode in CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑120370 | Discussion on common solution for CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑120371 | Further Discussions on New Carrier Type in LTE Rel-11 CA | Renesas Mobile Europe Ltd | Noted |
R1‑120372 | Discussion on assistance information for feICIC | Renesas Mobile Europe Ltd | Revised |
R1‑120373 | Need for inter-CSI-RS-resource feedback | Renesas Mobile Europe Ltd | Noted |
R1‑120374 | On aggregated CoMP feedback | Renesas Mobile Europe Ltd | Not treated |
R1‑120375 | DL CoMP rank reporting | Renesas Mobile Europe Ltd | Not treated |
R1‑120376 | CQI feedback options for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑120377 | Additional results on CoMP interference estimation | Renesas Mobile Europe Ltd | Not treated |
R1‑120378 | CoMP set management | Renesas Mobile Europe Ltd | Noted |
R1‑120379 | Downlink DM-RS for Release 11 | Renesas Mobile Europe Ltd | Noted |
R1‑120380 | Increasing CSI-RS density | Renesas Mobile Europe Ltd | Noted |
R1‑120381 | Uplink power control enhancements for Release 11 | Renesas Mobile Europe Ltd | Not treated |
R1‑120382 | Multiplexing between PDSCH and ePDCCH | Renesas Mobile Europe Ltd | Not treated |
R1‑120383 | On ePDCCH search spaces | Renesas Mobile Europe Ltd | Not treated |
R1‑120384 | Multiplexing of ePDCCHs within a PRB pair | Renesas Mobile Europe Ltd | Noted |
R1‑120385 | Association of DM-RS for ePDCCHs within a PRB pair | Renesas Mobile Europe Ltd | Noted |
R1‑120386 | On the need of PHICH enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑120387 | Diversity schemes for ePDCCH | Renesas Mobile Europe Ltd | Not treated |
R1‑120388 | Considerations for Low-Cost MTC LTE UEs | Renesas Mobile Europe Ltd | Not treated |
R1‑120389 | Reference signal design for interference measurement | Marvell | Not treated |
R1‑120390 | CSI-RS configuration for CoMP | Marvell | Not treated |
R1‑120391 | DM-RS design considerations for CoMP | Marvell | Not treated |
R1‑120392 | Search space design for E-PDCCH | ETRI | Revised |
R1‑120393 | Common Search space design for E-PDCCH | ETRI | Not treated |
R1‑120394 | PDSCH mapping/CRS pattern indication for multi-cell JP CoMP | ETRI | Not treated |
R1‑120395 | DM RS sequence setting for downlnk CoMP | ETRI | Not treated |
R1‑120396 | Parallel Transmissions for PRACH on SCell and PUCCH/PUSCH/SRS | NTT DOCOMO | Noted |
R1‑120397 | UL Control Signaling for Rel-11 CA Enhancement | NTT DOCOMO | Not treated |
R1‑120398 | Enhanced Cell Identification for Additional Carrier Type | NTT DOCOMO | Noted |
R1‑120399 | Transmission Scheme of DL Signals for Additional Carrier Type | NTT DOCOMO | Not treated |
R1‑120400 | UL Simultaneous Transmissions for Multiple TA | NTT DOCOMO | Noted |
R1‑120401 | Performance Evaluation of Non-zero Transmit Power ABS for FeICIC | NTT DOCOMO | Not treated |
R1‑120402 | Specification Impact to Support Non-zero Transmit Power ABS for FeICIC | NTT DOCOMO | Noted |
R1‑120403 | Views on TM9 and CA Based Approaches for Rel-11 CoMP | NTT DOCOMO | Not treated |
R1‑120404 | CSI Feedback Scheme for Rel-11 CoMP | NTT DOCOMO | Not treated |
R1‑120405 | Enhanced Interference Measurement Mechanism for Rel-11 | NTT DOCOMO | Not treated |
R1‑120406 | CoMP Measurement Set Management for CSI Feedback | NTT DOCOMO | Noted |
R1‑120407 | UE-specific DL DM-RS Sequence for Rel-11 CoMP | NTT DOCOMO | Noted |
R1‑120408 | Views on UE-Specific UL RS Assignment | NTT DOCOMO | Not treated |
R1‑120409 | DM-RS for E-PDCCH with TxD | NTT DOCOMO | Noted |
R1‑120410 | Search Space Design for E-PDCCH | NTT DOCOMO | Noted |
R1‑120411 | Mapping Design for E-PDCCH in Rel-11 | NTT DOCOMO | Noted |
R1‑120412 | Capability handling of LTE TDD and FDD modes | LG Electronics | Not treated |
R1‑120413 | Clarification on TDD when a UE is configured with simultaneousAckNackAndCQI and PUCCH format 3 | LG Electronics | Noted |
R1‑120414 | Draft CR for ACK/NACK related procedure in case of TDD UL-DL configuration 0 | LG Electronics | Noted - Revised |
R1‑120415 | Correction to the parameters in calculating power headroom reports | LG Electronics | Withdrawn |
R1‑120416 | Correction to the power control of PUSCH and PUCCH | LG Electronics | Noted - Revised |
R1‑120417 | Enhancement on Periodic CSI Transmission for Carrier Aggregation | LG Electronics | Revised |
R1‑120418 | Simultaneous Transmission of HARQ-ACK and CSI on PUCCH Format 3 | LG Electronics | Not treated |
R1‑120419 | View on transmit diversity for PUCCH format 1b with channel selection in Rel-11 | LG Electronics | Not treated |
R1‑120420 | Overall structure for full-duplex operation based TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑120421 | Overall issues on half-duplex operation based TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑120422 | Synchronization aspects of extension carrier | LG Electronics | Not treated |
R1‑120423 | Design principles for extension carrier | LG Electronics | Not treated |
R1‑120424 | Simultaneous transmissions in multiple TA groups | LG Electronics | Noted |
R1‑120425 | Initial transmission timing in SCell TA group | LG Electronics | Withdrawn |
R1‑120426 | Open Issues on Non-zero Power ABS | LG Electronics | Noted |
R1‑120427 | Cell Detection Principles for 9dB CRE bias | LG Electronics | Not treated |
R1‑120428 | Support for Rate-matching around CRS of Neighbor Cells | LG Electronics | Not treated |
R1‑120429 | Considerations on CSI Derivation in FeICIC | LG Electronics | Not treated |
R1‑120430 | Discussions on Interference Coordination between CoMP Clusters | LG Electronics | Not treated |
R1‑120431 | Enhancement to Time-domain Resource Partitioning | LG Electronics | Not treated |
R1‑120432 | Discussion on inter-CSI-RS-resource feedback | LG Electronics | Noted |
R1‑120433 | Consideration on aggregated feedback | LG Electronics | Not treated |
R1‑120434 | Views on per-cell Rel-8 CRS-based feedback | LG Electronics | Not treated |
R1‑120435 | Consideration on CoMP CQI definition | LG Electronics | Not treated |
R1‑120436 | Consideration on interference measurement for CoMP CSI feedback | LG Electronics | Not treated |
R1‑120437 | Management of CoMP Measurement Set | LG Electronics | Not treated |
R1‑120438 | Discussions on DMRS Configuration for CoMP | LG Electronics | Not treated |
R1‑120439 | CSI-RS sequence generation for Rel-11 CoMP | LG Electronics | Noted |
R1‑120440 | CSI-RS Configurations for Rel-11 CoMP | LG Electronics | Noted |
R1‑120441 | Discussions on Control Signaling for CoMP | LG Electronics | Not treated |
R1‑120442 | Uplink DMRS enhancements for UL-CoMP | LG Electronics | Not treated |
R1‑120443 | SRS Enhancements for CoMP in Rel-11 | LG Electronics | Noted |
R1‑120444 | Uplink Power Control for CoMP | LG Electronics | Not treated |
R1‑120445 | PUCCH for UL CoMP Scenarios | LG Electronics | Noted |
R1‑120446 | Multiple UL timing control | LG Electronics | Not treated |
R1‑120447 | Considerations on RS for E-PDCCH | LG Electronics | Revised |
R1‑120448 | Discussion on DL Assignment Placement | LG Electronics | Noted |
R1‑120449 | Multiplexing PDSCH and E-PDCCH within a PRB Pair | LG Electronics | Not treated |
R1‑120450 | WF on DL Assignment Placement | LG Electronics | Withdrawn |
R1‑120451 | On the Common Search Space for E-PDCCH-configured Ues | LG Electronics | Noted |
R1‑120452 | Resoruce Configuration for E-PDCCH based SS | LG Electronics | Not treated |
R1‑120453 | Discussion on Multiplexing of DCI Messages | LG Electronics | Not treated |
R1‑120454 | Concept of E-PDCCH CCE | LG Electronics | Noted - Revised |
R1‑120455 | Enhancement of PHICH/PUCCH associated with E-PDCCH | LG Electronics | Not treated |
R1‑120456 | Cost Saving Analysis with Bandwidth Reduction | LG Electronics | Noted |
R1‑120457 | Comments on evaluation methodology for low cost MTC UE | LG Electronics | Not treated |
R1‑120458 | Discussion on PUSCH Coverage Enhancements | LG Electronics | Noted |
R1‑120459 | Performance Evaluation for LTE TDD Enhancement | LG Electronics | Not treated |
R1‑120460 | On multi-cell periodic CSI reporting | Texas Instruments | Not treated |
R1‑120461 | Search space monitoring for RA procedure on a SCell | Texas Instruments | Not treated |
R1‑120462 | Physical layer aspects of multiple timing advance commands | Texas Instruments | Noted |
R1‑120463 | Further details on per-CSI-RS-resource feedback | Texas Instruments | Not treated |
R1‑120464 | RRM Measurement Set Management for CoMP Operation | Texas Instruments | Not treated |
R1‑120465 | Support for Cell Detection and Rate-Matching for Co-Channel Het-Nets in Rel-11 | Texas Instruments | Noted |
R1‑120466 | Discussion on DMRS configuration for DL CoMP | Texas Instruments | Not treated |
R1‑120467 | CSI-RS sequence for DL CoMP | Texas Instruments | Noted |
R1‑120468 | Consideration on CSI-RS-resource configuration for DL CoMP | Texas Instruments | Noted |
R1‑120469 | On the Need for Timing Advance Specification Changes for UL CoMP | Texas Instruments | Not treated |
R1‑120470 | Power control enhancements for UL CoMP | Texas Instruments | Not treated |
R1‑120471 | On reference signals for enhanced downlink control channels | Texas Instruments | Noted |
R1‑120472 | A Performance Comparison of PDCCH and ePDCCH | Texas Instruments | Not treated |
R1‑120473 | Search space of enhanced downlink control channel | Texas Instruments | Not treated |
R1‑120474 | Discussion on parallel transmissions of PRACH and PUSCH/PUCCH/SRS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120475 | Pilot design for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120476 | Codeword-to-layer mapping for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120477 | Efficient HS-DPCCH transmission in CELL_FACH during inactive period | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120478 | Remaining details of time budget for HSDPA multiflow | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑120479 | Uplink control channel structure for UL MIMO and 64QAM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120480 | Discussion on Periodic CSI Dropping in Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120481 | Analysis of Tx Diversity schemes for PUCCH format 1b with channel selection | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120482 | Transmit diversity scheme for PUCCH format 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120483 | On the specification impact of supporting different TDD UL-DL configurations on different bands | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑120484 | Acquisition/synchronisation/tracking and RS for unsynchronised carriers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120485 | Other design aspects of the new carrier type | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120486 | Power scaling for simultaneous transmissions of multiple UL channels with multiple TA groups | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120487 | Draft CR to 36.213 for physical layer aspects of multiple TA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120488 | Consideration of Signalling Support for Non-Zero Power ABS | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑120489 | Evaluations of Non-Zero Power ABS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120490 | Further Consideration of CRS Processing in FeICIC | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120491 | 36.214 CR0018R3 (Rel-11, B) UL Relative Time of Arrival | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson | Not treated |
R1‑120492 | Analysis of inter-CSI-RS-resource phase feedback | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑120493 | Analysis of inter-CSI-RS-resource amplitude feedback | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120494 | CQI definition for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120495 | Interference measurement for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120496 | CoMP Operation and UE Mobility | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120497 | Orthogonality of DM-RS for MU CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120498 | Scrambling sequence for CSI-RS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120499 | Downlink control signalling and transmission modes for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑120500 | On the need for SRS enhancements for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120501 | Discussion on Fractional Power Control Enhancement for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑120502 | PUCCH power control for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120503 | SRS power control for UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120504 | UCI transmission enhancement for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑120505 | Timing alignment for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120506 | On the need for RACH enhancement for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑120507 | Further details of ePDCCH UE-specific search space design | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120508 | Multiplexing of different DCI messages on ePDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120509 | PHICH Enhancements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120510 | Support of reduced maximum bandwidth for low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120511 | Potential Solutions for UL Coverage Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120512 | Performance evaluation of LTE TDD DL-UL reconfiguration in accordance with traffic adaptation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120513 | Discussion of HARQ timing and UL grant with dynamic TDD UL-DL configuration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑120514 | Draft CR (36.213, Rel9, Cat F) on RNTI Configuration associated with DL Resource Allocation Type 2 | Motorola Mobility | Noted - Revised |
R1‑120515 | Reference and Synchronisation Signals in Additional Carrier Type | Motorola Mobility | Noted |
R1‑120516 | Impact of Multi-TA transmissions on UL Power Control | Motorola Mobility | Withdrawn |
R1‑120517 | EPDCCH Search Space | Motorola Mobility | Noted |
R1‑120518 | EPDCCH and PDSCH Multiplexing | Motorola Mobility | Noted |
R1‑120519 | Initial Analysis of EPDCCH Link Performance | Motorola Mobility | Not treated |
R1‑120520 | Inter-CSI-RS-resource Feedback for CoMP | Motorola Mobility | Noted |
R1‑120521 | CQI Definition for CoMP | Motorola Mobility | Not treated |
R1‑120522 | Interference Measurements for Release-11 | Motorola Mobility | Not treated |
R1‑120523 | Downlink RS configuration | Motorola Mobility | Noted |
R1‑120524 | Pathloss Estimation for Uplink CoMP Power Control | Motorola Mobility | Not treated |
R1‑120525 | DL Timing Reference for UL CoMP | Motorola Mobility | Not treated |
R1‑120526 | On evaluation of LTE-based Low-cost MTC UEs | Motorola Mobility | Not treated |
R1‑120527 | FDD/TDD acceptable differences | Qualcomm Inc. | Noted |
R1‑120528 | Discussion on MBMS FEC evaluation framework | Qualcomm Inc. | Not treated |
R1‑120529 | DL control channel enhancements for CA operation | Qualcomm Inc. | Not treated |
R1‑120530 | On reducing periodic CSI dropping for CA operation | Qualcomm Inc. | Not treated |
R1‑120531 | On enhanced AN bundling for CA operation | Qualcomm Inc. | Not treated |
R1‑120532 | TxD scheme for PUCCH format 1b with channel selection | Qualcomm Inc. | Not treated |
R1‑120533 | TxD scheme for PUCCH format 3 | Qualcomm Inc. | Not treated |
R1‑120534 | Support of CA for different TDD UL-DL configurations | Qualcomm Inc. | Not treated |
R1‑120535 | On the new carrier type in Rel-11 | Qualcomm Inc. | Withdrawn |
R1‑120536 | Acquisition, time and frequency tracking for the new carrier type | Qualcomm Inc. | Noted |
R1‑120537 | On the new carrier type in Rel-11 | Qualcomm Inc. | Not treated |
R1‑120538 | On the maximum allowed timing offset | Qualcomm Inc. | Not treated |
R1‑120539 | SRS operation in multiple TA offset CA | Qualcomm Inc. | Noted |
R1‑120540 | Power control aspects of multiple TA operation | Qualcomm Inc. | Noted |
R1‑120541 | Signalling support for non-zero transmit power ABS | Qualcomm Inc. | Not treated |
R1‑120542 | Signaling assistance for cell detection | Qualcomm Inc. | Noted |
R1‑120543 | Need for transmitter based solutions | Qualcomm Inc. | Not treated |
R1‑120544 | On the need for inter-CSI-RS-resource feedback | Qualcomm Inc. | Noted |
R1‑120545 | On the need for supporting aggregated feedback for CoMP | Qualcomm Inc. | Not treated |
R1‑120546 | Supporting CRS-based CoMP operation | Qualcomm Inc. | Not treated |
R1‑120547 | CQI definitions in support of downlink CoMP | Qualcomm Inc. | Not treated |
R1‑120548 | Interference measurement in support of downlink CoMP | Qualcomm Inc. | Not treated |
R1‑120549 | CoMP measurement set and RRM management | Qualcomm Inc. | Noted |
R1‑120550 | DM-RS configuration in support of downlink CoMP | Qualcomm Inc. | Noted |
R1‑120551 | CSI-RS sequence design in support of CoMP | Qualcomm Inc. | Noted |
R1‑120552 | CSI-RS configuration in support of CoMP | Qualcomm Inc. | Noted |
R1‑120553 | Downlink control signaling in support of downlink CoMP | Qualcomm Inc. | Not treated |
R1‑120554 | DM-RS Enhancements in support of Uplink CoMP | Qualcomm Inc. | Not treated |
R1‑120555 | SRS enhancements in support of Uplink CoMP | Qualcomm Inc. | Noted |
R1‑120556 | Uplink power control issues in CoMP | Qualcomm Inc. | Noted |
R1‑120557 | Uplink control signaling for CoMP | Qualcomm Inc. | Not treated |
R1‑120558 | Uplink timing advance | Qualcomm Inc. | Not treated |
R1‑120559 | Reference signals for e-PDCCH | Qualcomm Inc. | Noted |
R1‑120560 | Multiplexing e-PDCCH with PDSCH | Qualcomm Inc. | Noted |
R1‑120561 | Search space design for e-PDCCH | Qualcomm Inc. | Noted |
R1‑120562 | Multiplexing of different DCI messages for e-PDCCH | Qualcomm Inc. | Not treated |
R1‑120563 | Impact of reduction on maximum bandwidth on MTC | Qualcomm Inc. | Noted |
R1‑120564 | Impact of single Rx on MTC | Qualcomm Inc. | Not treated |
R1‑120565 | Impact of peak rate reduction on MTC | Qualcomm Inc. | Noted |
R1‑120566 | Impact of maximum power reduction on MTC | Qualcomm Inc. | Not treated |
R1‑120567 | Impact of half duplex operation on MTC | Qualcomm Inc. | Not treated |
R1‑120568 | Additional comments on cost evaluation of MTC | Qualcomm Inc. | Not treated |
R1‑120569 | The Overview of VU-ePDCCH design framework | NewPostcom | Not treated |
R1‑120570 | The Parallel Work mode and eICIC Support of VU-ePDCCH Framework | NewPostcom | Not treated |
R1‑120571 | The Long Term Evolution Vision on VU-ePDCCH Design Framework | NewPostcom | Not treated |
R1‑120572 | A High Capacity NetWork Asisted RS (HC-NWA-RS) Design for CoMP Measurements | NewPostcom | Not treated |
R1‑120573 | The function partition of CoMP Measurement Set and RRM Measurement Set | NewPostcom | Not treated |
R1‑120574 | Views on Non-zero Transmit Power ABS | China Unicom | Not treated |
R1‑120575 | Considerations on CoMP and TDM eICIC Simultaneous Deployment | China Unicom | Not treated |
R1‑120576 | Discussion on Case 7 of Multiflow Data Transmission Configuration | China Unicom, Huawei, Huawei HiSilicon | Noted |
R1‑120577 | Discussion on Coverage Issues Identification | China Unicom | Not treated |
R1‑120578 | TR36.824 v0.0.1 LTE Coverage Enhancements | China Telecom (Rapporteur) | Noted - Revised |
R1‑120579 | Potential Solutions for Uplink Coverage Enhancements | China Telecom | Noted |
R1‑120580 | On Cell Detection Improvement for FeICIC | China Telecom | Noted |
R1‑120581 | On Search Space of ePDCCH | China Telecom | Not treated |
R1‑120582 | 25.214 CR0664 (Rel-10, F) Clarification of UL DPCCH Slot Format when DPC_Mode is 1 and CPC is not Enabled | Qualcomm Incorporated | Noted - Revised |
R1‑120583 | Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑120584 | 25.211 CR0290 (Rel-8, F) Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Noted - Revised |
R1‑120585 | Remaining design aspects of CLTD | Qualcomm Incorporated | Noted |
R1‑120586 | UE signaling to enable/disable CLTD | Qualcomm Incorporated | Noted |
R1‑120587 | On the need for CLTD configurations II and III | Qualcomm Incorporated | Noted |
R1‑120588 | Performance of F-TPICH in Softer Handover Scenarios | Qualcomm Incorporated | Noted |
R1‑120589 | 25.211 DraftCR (Rel-11, B) Introduction of Closed Loop Transmit Diversity | Qualcomm Incorporated | Revised |
R1‑120590 | 25.212 DraftCR (Rel-11, B) Introduction of Closed Loop Transmit Diversity | Qualcomm Incorporated | Noted - Revised |
R1‑120591 | 25.213 DraftCR (Rel-11, B) Introduction of Closed Loop Transmit Diversity | Qualcomm Incorporated | Noted - Revised |
R1‑120592 | 25.214 DraftCR (Rel-11, B) Introduction of Closed Loop Transmit Diversity | Qualcomm Incorporated | Noted - Revised |
R1‑120593 | Link simulation results for Four-Branch MIMO | Qualcomm Incorporated | Withdrawn |
R1‑120594 | Antenna subset selection in Four Branch MIMO | Qualcomm Incorporated | Noted |
R1‑120595 | Design aspects of Standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑120596 | Common Relative Grant for Interference Control in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑120597 | PRACH Access Delay Reduction in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑120598 | Enabling Softer Handover in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑120599 | MIMO in Multiflow HSDPA | Qualcomm Incorporated | Noted |
R1‑120600 | HS-DPCCH Timing in Multiflow HSDPA | Qualcomm Incorporated | Noted |
R1‑120601 | Configurations in Multiflow HSDPA | Qualcomm Incorporated | Noted |
R1‑120602 | Design Aspects of Data Channels for UL MIMO | Qualcomm Incorporated | Noted |
R1‑120603 | Design Aspects of Control Channels for UL MIMO | Qualcomm Incorporated | Noted |
R1‑120604 | Power Control for UL MIMO in HSPA | Qualcomm Incorporated | Noted |
R1‑120605 | Downlink Design Aspects for UL MIMO | Qualcomm Incorporated | Noted |
R1‑120606 | Simulation Methodology for UL MIMO+64QAM for HSPA | Qualcomm Incorporated | Not treated |
R1‑120607 | Initial performance analysis of 64QAM | Qualcomm Incorporated | Noted |
R1‑120608 | Views on CRS/PDSCH RE Collision in Joint Transmission | Intel Corporation | Not treated |
R1‑120609 | Analysis of ePDCCH and PDSCH Multiplexing | Intel Corporation | Not treated |
R1‑120610 | UE-RS Multiplexing for Multiple CCEs | Intel Corporation | Revised |
R1‑120611 | Frequency and Time synchronization aspects of additional carrier type | Intel Corporation | Noted |
R1‑120612 | Discussion of Pathloss Estimation in Uplink Power Control | Intel Corporation | Withdrawn |
R1‑120613 | Performance Impact of Open Loop Power Control Parameter Settings in HetNet | Intel Corporation | Not treated |
R1‑120614 | Discussion of potential schemes for uplink coverage enhancement | ZTE | Noted |
R1‑120615 | Simulation conditions for discontiuous CQI reporting | TD Tech | Noted - Revised |
R1‑120616 | Considerations on reference signals for E-PDCCH | Potevio | Not treated |
R1‑120617 | Considerations on search space design for E-PDCCH | Potevio | Not treated |
R1‑120618 | Cross-carrier scheduling in different bands with different TDD UL-DL configurations | Potevio | Not treated |
R1‑120619 | Editorial corrections in 36.212 | Potevio | Agreed in principle |
R1‑120620 | UL measurements for MDT UL coverage use case in LTE | MediaTek Inc. | Noted |
R1‑120621 | Tracking based on CRS and CSI-RS in additional carrier type | MediaTek Inc. | Noted |
R1‑120622 | Signalling support for non-zero transmit power ABS | MediaTek Inc. | Not treated |
R1‑120623 | On the need of aggregated CQI and inter-CSI-RS-resource feedback for CoMP | MediaTek Inc. | Not treated |
R1‑120624 | Aggregated feedback and configuration | MediaTek Inc. | Not treated |
R1‑120625 | CQI for multi-CSI-RS-resource feedback for Rel-11 | MediaTek Inc. | Not treated |
R1‑120626 | Interference measurement for CoMP and Rel-11 | MediaTek Inc. | Not treated |
R1‑120627 | Management of CoMP and RRM measurement set | MediaTek Inc. | Not treated |
R1‑120628 | DM-RS Utilization of Diversity and Beamforming Schemes for ePDCCH | MediaTek Inc. | Not treated |
R1‑120629 | Physical Structure of ePDCCH and Its Mulitplexing with PDSCH | MediaTek Inc. | Not treated |
R1‑120630 | Search space design for ePDCCH | MediaTek Inc. | Noted |
R1‑120631 | Analysis of maximum bandwidth reduction | MediaTek Inc. | Noted |
R1‑120632 | Analysis of single receive RF chain | MediaTek Inc. | Not treated |
R1‑120633 | Analysis of reduction in peak rate | MediaTek Inc. | Not treated |
R1‑120634 | Analysis of reduction in transmit power | MediaTek Inc. | Not treated |
R1‑120635 | Analysis of half duplex operation | MediaTek Inc. | Not treated |
R1‑120636 | Cost Drivers of LTE modem and Text Proposal | MediaTek Inc. | Noted |
R1‑120637 | Assessment of UL Measurements for MDT UL Coverage Use Case for UTRA | MediaTek Inc. | Noted |
R1‑120638 | Discussion on multiplexing of ePDCCH and PDSCH | CMCC | Not treated |
R1‑120639 | Discussion on Search Space Design for Enhanced PDCCH | CMCC | Not treated |
R1‑120640 | Discussion on additional special subframe configuration | CMCC | Not treated |
R1‑120641 | Discussion on further enhancements to LTE TDD for dynamic TDD UL-DL configuration | CMCC | Not treated |
R1‑120642 | Email discussion summary on Inter-band CA for supporting different TDD UL-DL configuration | CMCC | Revised |
R1‑120643 | Consideration on Reduction of Peak rate for Low-Cost MTC UEs | China Unicom | Noted |
R1‑120644 | 25.212 CR0298 (Rel-8, F) Clarification to Target cell HS-SCCH order type | Nokia Siemens Networks, Intel Corporation, Qualcomm Incorporated, Renesas Mobile Europe Ltd | Agreed |
R1‑120645 | 25.212 CR0299 (Rel-9, A) Clarification to Target cell HS-SCCH order type | Nokia Siemens Networks, Intel Corporation, Qualcomm Incorporated, Renesas Mobile Europe Ltd | Agreed |
R1‑120646 | 25.212 CR0300 (Rel-10, A) Clarification to Target cell HS-SCCH order type | Nokia Siemens Networks, Intel Corporation, Qualcomm Incorporated, Renesas Mobile Europe Ltd | Agreed |
R1‑120647 | 25.212 CR0301 (Rel-11, A) Clarification to Target cell HS-SCCH order type | Nokia Siemens Networks, Intel Corporation, Qualcomm Incorporated, Renesas Mobile Europe Ltd | Agreed |
R1‑120648 | 25.212 CR0302 (Rel-10, F) Correction to 4C-HSDPA CQI report mapping scenarios table | Nokia Siemens Networks | Agreed |
R1‑120649 | 25.212 CR0303 (Rel-11, A) Correction to 4C-HSDPA CQI report mapping scenarios table | Nokia Siemens Networks | Agreed |
R1‑120650 | 25.212 CR0304 (Rel-11, F) Introduction of 8C-HSDPA CQI report mapping scenarios table | Nokia Siemens Networks | Noted - Revised |
R1‑120651 | Common pilot design for 4-Tx MIMO | Nokia Siemens Networks | Noted |
R1‑120652 | Integrating power balancing network into 4Tx MIMO | Nokia Siemens Networks | Noted |
R1‑120653 | Multiflow with single and dual-stream MIMO | Nokia Siemens Networks | Noted |
R1‑120654 | HS-DPCCH structure and timing with Multiflow HSDPA | Nokia Siemens Networks | Not treated |
R1‑120655 | Multiflow CQI reporting formats | Nokia Siemens Networks | Noted |
R1‑120656 | Multiflow 25.21x specification impacts | Nokia Siemens Networks | Noted |
R1‑120657 | Evaluation of PARC and TxAA for UL MIMO | Nokia Siemens Networks | Noted |
R1‑120658 | MIMO uplink physical channel structure | Nokia Siemens Networks | Noted |
R1‑120659 | MIMO HARQ operation | Nokia Siemens Networks | Not treated |
R1‑120660 | MIMO scheduling and E-TFC selection principles | Nokia Siemens Networks | Noted |
R1‑120661 | MIMO power control | Nokia Siemens Networks | Noted |
R1‑120662 | DL grant channel desing for UL MIMO | Nokia Siemens Networks | Noted |
R1‑120663 | UL 64QAM 25.21x specification impacts | Nokia Siemens Networks | Not treated |
R1‑120664 | UL 64QAM simulation results | Nokia Siemens Networks | Noted |
R1‑120665 | Open issues for different TDD UL-DL configurations | ASUSTeK | Not treated |
R1‑120666 | PUCCH Resource Allocation Corresponding to ePDCCH | ASUSTeK | Not treated |
R1‑120667 | RF transceiver and filter cost reduction for Low-Cost MTC UE | Institute for Information Industry (III) | Noted |
R1‑120668 | Selecting Maximum Bandwidth for Low-cost MTC | Institute for Information Industry (III) | Noted |
R1‑120669 | Discussion on the necessity of HARQ for low cost MTC LTE UE | Institute for Information Industry (III) | Not treated |
R1‑120670 | PDCCH enhancement for different TDD UL-DL configuration on different bands | NTT DOCOMO | Not treated |
R1‑120671 | System level performance evaluation for UL signaling enhancement of CA | KDDI | Not treated |
R1‑120672 | Views on UL Simultaneous Transmissions in Multiple TA | KDDI | Not treated |
R1‑120673 | Performance Evaluations of the signaling schemes for transmission^^power information | KDDI | Not treated |
R1‑120674 | Performance Evaluation of PSS/SSS | KDDI | Withdrawn |
R1‑120675 | Performance Evaluation on RSRP measurement by SRS | KDDI | Noted |
R1‑120676 | UL DMRS Enhancements for UL CoMP | KDDI | Not treated |
R1‑120677 | SRS Enhancements for UL CoMP | KDDI | Not treated |
R1‑120678 | Transmit Power Control Enhancements for UL CoMP | KDDI | Not treated |
R1‑120679 | CSI-RS arrangement for supporting enhanced downlink control channels | KDDI | Not treated |
R1‑120680 | Intermittent transmission of enhanced downlink control channels | KDDI | Not treated |
R1‑120681 | Configuration of localized and distributed transmission for E-PDCCH | KDDI | Noted |
R1‑120682 | Remaining issues for stand-alone HS-DPCCH in CELL_FACH | ZTE | Noted |
R1‑120683 | Further analysis of HS-DPCCH timing for MF-HSDPA | ZTE | Not treated |
R1‑120684 | Dynamic control and CPC for MF-HSDPA | ZTE | Noted |
R1‑120685 | Further considerations on F-TPICH reception quality in softer handover regions | Huawei, HiSilicon | Noted |
R1‑120686 | 25.214 CR Clarification of Uplink Closed Loop Transmit Diversity operation | Huawei, HiSilicon | Noted |
R1‑120687 | Further Considerations and Simulations for Pilot Design | Huawei, HiSilicon | Noted |
R1‑120688 | Evaluation on Codeword to Layer Mapping | Huawei, HiSilicon | Noted |
R1‑120689 | Further discussion on Stand-alone HS-DPCCH | Huawei, HiSilicon | Noted |
R1‑120690 | UE based interference control in CELL_FACH | Huawei, HiSilicon | Noted |
R1‑120691 | Evaluation on TTI alignment between CELL_FACH UEs and CELL_DCH Ues | Huawei, HiSilicon | Noted |
R1‑120692 | HS-DPCCH Feedback Design for MF-Tx | Huawei, HiSilicon | Noted |
R1‑120693 | L1 Control of MF-Tx (De)activation and CPC | Huawei, HiSilicon | Noted |
R1‑120694 | General Considerations on Uplink MIMO | Huawei, HiSilicon | Noted |
R1‑120695 | Evaluation methodology for Uplink MIMO | Huawei, HiSilicon | Not treated |
R1‑120696 | Impact on UE for UL MIMO | HiSilicon, Huawei | Not treated |
R1‑120697 | DM-RS sequence for CoMP scenario 3 and 4 | HTC | Not treated |
R1‑120698 | More CSI-RS sequence for CoMP scenario 3 and 4 | HTC | Noted |
R1‑120699 | A CSI-RS configuration for channel estimation and interference measurement | HTC | Noted |
R1‑120700 | Initial access for CoMP scenario 3 and 4 | HTC | Not treated |
R1‑120701 | Downlink control signalling enhancement for CA | HTC | Not treated |
R1‑120702 | Identification of DL-control Information at the Low-cost MTC UEs | ETRI | Not treated |
R1‑120703 | Periodic CSI multiplexing for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑120704 | Views on additional A/N bundling when using PUCCH Format 3 | Nokia Siemens Networks, Nokia | Not treated |
R1‑120705 | On Transmit Diversity Scheme for PUCCH Format 1b with Channel Selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑120706 | Summary of the email discussion on "Method of performing system-level overhead analysis for PUCCH Format 3 TxD" | Nokia Siemens Networks | Noted |
R1‑120707 | Overhead analysis for PUCCH Format 3 transmit diversity | Nokia Siemens Networks, Nokia | Noted |
R1‑120708 | Views on inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Not treated |
R1‑120709 | Performance of time/frequency tracking on new carrier type | Nokia Siemens Networks, Nokia | Noted |
R1‑120710 | Assumptions and deployment scenarios for new carrier types | Nokia, Nokia Siemens Networks | Not treated |
R1‑120711 | General considerations on new carrier types | Nokia Siemens Networks, Nokia | Revised |
R1‑120712 | On Multiple Timing Advance in RAN1 | Nokia Siemens Networks, Nokia | Not treated |
R1‑120713 | Reduced transmission power ABS concept considerations | Nokia Siemens Networks, Nokia | Not treated |
R1‑120714 | Performance of low power ABS | Nokia Siemens Networks, Nokia | Not treated |
R1‑120715 | On signalling support for FeICIC | Nokia Siemens Networks, Nokia | Noted |
R1‑120716 | Further considerations on Tx based enhancements for Rel-11 | Nokia Siemens Networks, Nokia | Not treated |
R1‑120717 | Further considerations on potential for uplink capacity enhancement when applying TDM eICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑120718 | Need for inter-CSI-RS-resource feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑120719 | Aggregated feedback for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑120720 | Per-cell Rel-8 CRS-based feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑120721 | CQI definition for CoMP support in Rel-11 | Nokia Siemens Networks, Nokia | Not treated |
R1‑120722 | Interference measurement support for Rel-11 | Nokia Siemens Networks, Nokia | Not treated |
R1‑120723 | CoMP and RRM measurement set management | Nokia Siemens Networks, Nokia | Revised |
R1‑120724 | DM-RS enhancements for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑120725 | Remaining issues of CSI-RS design for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑120726 | Downlink control signaling and transmission mode design for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑120727 | On DM RS Enhancements for UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑120728 | On Uplink Sounding Enhancements for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑120729 | Uplink Power Control with UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑120730 | PUCCH Enhancements for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑120731 | Standardization roadmap for E-PDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑120732 | Demodulation reference signal for E-PDCCH | Nokia, Nokia Siemens Networks | Noted |
R1‑120733 | Control channel regions for E-PDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑120734 | Considerations on search spaces for the E-PDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑120735 | Multiplexing of E-PDCCH for different users | Nokia, Nokia Siemens Networks | Noted |
R1‑120736 | Analysis of reduction of maximum bandwidth for low-cost MTC UE | Nokia Siemens Networks, Nokia | Noted |
R1‑120737 | Analysis of single receive RF chain for low-cost MTC UE | Nokia Siemens Networks, Nokia | Not treated |
R1‑120738 | Analysis of reduction of peak rate for low-cost MTC UE | Nokia Siemens Networks, Nokia | Noted |
R1‑120739 | Analysis of reduction of transmit power for low-cost MTC UE | Nokia Siemens Networks, Nokia | Not treated |
R1‑120740 | Analysis of half duplex operation for low-cost MTC UE | Nokia Siemens Networks, Nokia | Not treated |
R1‑120741 | Coverage Enhancements for Medium Data Rate | Nokia Siemens Networks, Nokia | Noted |
R1‑120742 | Coverage Enhancements for VoIP | Nokia Siemens Networks, Nokia | Noted |
R1‑120743 | On PUCCH Format 1 Coverage Enhancements | Nokia Siemens Networks, Nokia | Noted |
R1‑120744 | Evaluation results for LTE_TDD_eIMTA in isolated cell scenario | Nokia, Nokia Siemens Networks | Not treated |
R1‑120745 | Consideration on CSI Feedback framework to support DL CoMP | Fujitsu | Not treated |
R1‑120746 | On the need of inter-CSI-RS-resource phase/amplitude feedback | Fujitsu | Not treated |
R1‑120747 | Discussion on resource elements for interference measurement | Fujitsu | Not treated |
R1‑120748 | Consideration on SRS enhancement for CoMP | Fujitsu | Not treated |
R1‑120749 | Considerations on Enhanced Uplink Power Control for UL CoMP | Fujitsu | Not treated |
R1‑120750 | Considerations on PUCCH Enhancement for UL CoMP | Fujitsu | Not treated |
R1‑120751 | E-PDCCH with Frequency Localized and Distributed Transmission | Fujitsu | Not treated |
R1‑120752 | Search Space Design for Downlink Control Channel | Fujitsu | Not treated |
R1‑120753 | Initial considerations on enhanced PHICH | Fujitsu | Not treated |
R1‑120754 | Discussion on simultaneous transmissions of PRACH and PUCCH/PUSCH/SRS | Fujitsu | Not treated |
R1‑120755 | Zero-power and non-zero power CSI-RS configurations | Fujitsu | Noted |
R1‑120756 | Support for CSI-RS Configurations for Interference Measurements for CoMP | Fujitsu | Not treated |
R1‑120757 | Overview of multiplexing of DCI formats for localised and distributed E-PDCCH transmissions | Fujitsu | Noted |
R1‑120758 | Automous CQI report transmission by UE | Fujitsu | Withdrawn |
R1‑120759 | Cross-subframe scheduling by E-PDCCH | Fujitsu | Not treated |
R1‑120760 | Considerations on PUSCH DM-RS resources for UL CoMP scenario4 | Fujitsu | Not treated |
R1‑120761 | CSI RS configuration for CSI report | Fujitsu | Noted |
R1‑120762 | Siganling of CSI RS configuration for DL path loss determination | Fujitsu | Not treated |
R1‑120763 | Consideration of signaling support for EPDCCH | Fujitsu | Not treated |
R1‑120764 | Discussion of EPDCCH search space to support narrow bandwidth operation | Fujitsu | Noted |
R1‑120765 | On power consumption of low-cost LTE MTC devices | Fujitsu | Not treated |
R1‑120766 | On the UL BW Reduction of LTE Low-Cost UE | Fujitsu | Noted |
R1‑120767 | UL Timing Advance Challenges when Supporting UL CoMP | Fujitsu | Not treated |
R1‑120768 | Discussion on the features and signaling support for non-zero transmit power ABS | Fujitsu | Not treated |
R1‑120769 | Analysis on the potential network assistance for cell detection | Fujitsu | Not treated |
R1‑120770 | Discussion on synchronization problem for cell detection with network assistance | Fujitsu | Noted |
R1‑120771 | Enhancements to UL power control for Rel-11 | Ericsson/ST-Ericsson | Not treated |
R1‑120772 | Details on UL DMRS | Ericsson/ST-Ericsson | Revised |
R1‑120773 | Potential enhancements on SRS | Ericsson/ST-Ericsson | Not treated |
R1‑120774 | Enhancements for UL control signalling | Ericsson/ST-Ericsson | Not treated |
R1‑120775 | Clarification on the HARQ-ACK reporting scheme | ITRI | Agreed in principle |
R1‑120776 | Clarification on the conditions for HARQ-ACK reporting | ITRI | Agreed in principle |
R1‑120777 | Clarification on the definition of UCI fields and the number of antenna port | ITRI | Noted - Revised |
R1‑120778 | Inter-CSI-RS-resource feedback for downlink CoMP | ITRI | Not treated |
R1‑120779 | Comparison of transmit diversity schemes for PUCCH Format 3 | Mitsubishi Electric | Not treated |
R1‑120780 | Views on restriction of physical layer simplifications to low performance MTC UEs | Orange | Revised |
R1‑120781 | Isolated cell performance for LTE TDD traffic adaptation | Ericsson/ST-Ericsson | Not treated |
R1‑120782 | Assumptions for further evaluation of LTE TDD traffic adaptation | Ericsson/ST-Ericsson | Not treated |
R1‑120783 | Performance of Incoherent and Coherent JT CoMP | Ericsson, ST-Ericsson | Noted |
R1‑120784 | CSI Feedback Operation for CoMP | Ericsson, ST-Ericsson | Not treated |
R1‑120785 | New Interference Measurements for Rel-11 | Ericsson, ST-Ericsson | Not treated |
R1‑120786 | Use of CSI-RS for CoMP Measurement Set Management | Ericsson, ST-Ericsson | Noted |
R1‑120787 | Flexible DM-RS Configuration for Dynamic Inter-Point Coordination | Ericsson, ST-Ericsson | Noted |
R1‑120788 | State Transition to CELL_DCH for Uplink Interference Control and Avoidance | Renesas Mobile Europe Ltd | Noted |
R1‑120789 | Downlink control signaling for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑120790 | Evaluation results on TDD DL/UL reconfiguration in isolated cell scenario | Renesas Mobile Europe Ltd | Withdrawn |
R1‑120791 | Dual codeword layer mapping and control aspects | InterDigital Communications, LLC | Noted |
R1‑120792 | Timing analysis of HS-DPCCH transmission for HSDPA MF-TX | InterDigital Communications, LLC | Not treated |
R1‑120793 | UL MIMO transmission structures design and architecture | InterDigital Communications, LLC | Noted |
R1‑120794 | Preliminary 64QAM UL simulation results | InterDigital Communications, LLC | Noted |
R1‑120795 | Report of email discussion on TR inputs for "Cost drivers of reference LTE modem" | Vodafone Group | Noted |
R1‑120796 | Updated TR 36.888 | Vodafone Group | Noted - Revised |
R1‑120797 | Views on Cost reduction techniques for "Low cost MTC UE based on LTE" | Vodafone Group | Not treated |
R1‑120798 | Cost Analysis of Reduced Bandwidth MTC LTE UEs with Text Proposal | IPWireless Inc. | Noted |
R1‑120799 | Backwards compatible support for reduced bandwidth LTE UEs | IPWireless Inc. | Noted |
R1‑120800 | A discussion and text proposal for reduced transmit power in MTC networks | IPWireless Inc. | Not treated |
R1‑120801 | Physical channel capacity analysis for MTC | IPWireless Inc. | Not treated |
R1‑120802 | Analysis and Text Proposal for Cost Drivers of Reference LTE Modem | IPWireless Inc. | Noted |
R1‑120803 | Low cost MTC UE: Assessment of RAN2 and RAN4 impacts | IPWireless Inc. | Noted |
R1‑120804 | Signalling support for reduced non-zero power ABS | Ericsson, ST-Ericsson | Noted |
R1‑120805 | On network assistance for cell detection for 9 dB bias | Ericsson, ST-Ericsson | Withdrawn |
R1‑120806 | Views on Comparation and Co-existence of FeICIC and CoMP | NewPostcom, TD Tech | Not treated |
R1‑120807 | 25.214 CR0665 (Rel-11, F) Correction to F-TPICH Transmission | Huawei, HiSilicon | Noted |
R1‑120808 | MDT UL coverage use case | Ericsson, ST-Ericsson | Noted |
R1‑120809 | Discussion on assistance information for feICIC | Renesas Mobile Europe Ltd | Noted |
R1‑120810 | Common Pilot Design for Four branch MIMO System | Ericsson | Noted |
R1‑120811 | Achievable Gains with Dedicated Pilots in a Four branch MIMO System | Ericsson | Noted |
R1‑120812 | Number of HARQ process for Rank 2 in a four branch MIMO System | Ericsson | Noted |
R1‑120813 | Cost Drivers Analysis of the Reference LTE Modem | Fujitsu | Not treated |
R1‑120814 | Discussion on PDCCH with reduced overhead in Rel-11 | ZTE | Not treated |
R1‑120815 | DM-RS Enhancements for UL CoMP | Intel Corporation | Not treated |
R1‑120816 | UE-RS Multiplexing for Multiple CCEs | Intel Corporation | Noted |
R1‑120817 | Further Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Noted |
R1‑120818 | 25.214 CR0666 (Rel-8, F) Further Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Agreed |
R1‑120819 | 25.214 CR0667 (Rel-9, A) Further Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Agreed |
R1‑120820 | 25.214 CR0668 (Rel-10, A) Further Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Agreed |
R1‑120821 | Matrix of Potential MTC LTE UE Cost Reductions | IPWireless Inc. | Not treated |
R1‑120822 | Cost Analysis of Single Receive Chain MTC LTE UEs with Text Proposal | IPWireless Inc. | Not treated |
R1‑120823 | Cost Analysis of Reduced Peak Rate MTC LTE UEs with Text Proposal | IPWireless Inc. | Not treated |
R1‑120824 | Cost Analysis of Reduced Transmit Power MTC LTE UEs with Text Proposal | IPWireless Inc. | Not treated |
R1‑120825 | Cost Analysis of Half Duplex MTC LTE UEs with Text Proposal | IPWireless Inc. | Not treated |
R1‑120826 | [Draft] Reply LS on LS (S4-111114) on MBMS FEC Evaluation Framework | Huawei | Noted - Revised |
R1‑120827 | Consideration for uplink power control in UL CoMP | ZTE | Not treated |
R1‑120828 | DMRS enhancements for UL-CoMP | Sharp | Not treated |
R1‑120829 | Preparation Work in 3GPP for ITU related to Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | TSG RAN ITU-R Ad Hoc | Noted |
R1‑120830 | RAN1-related FGI bits and capabilities that may be allowed to be different for FDD and TDD | Qualcomm Incorporated | Revised |
R1‑120831 | Reply LS on LS on MBMS FEC Evaluation Framework | RAN1, Huawei | Agreed |
R1‑120832 | General considerations on new carrier types | Nokia Siemens Networks, Nokia | Not treated |
R1‑120833 | LS reply on parallel transmissions of PRACH and PUSCH/PUCCH/SRS | Huawei | Noted - Revised |
R1‑120834 | [draft] RAN1 feedbacks on Preparation Work in 3GPP for ITU related to Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | Telecom Italia | Noted - Revised |
R1‑120835 | Clarification on the definition of UCI fields and the number of antenna port | ITRI | Noted - Revised |
R1‑120836 | 36.212 CR0132R1 (Rel-10, F) Corrections on payload size adjustment for DCI format 0, 1A and 1 | Huawei, HiSilicon, ZTE, Panasonic, Ericsson, ST-Ericsson, Texas Instruments, Fujitsu, Qualcomm, Samsung | Noted - Revised |
R1‑120837 | CoMP and RRM measurement set management | Nokia Siemens Networks, Nokia | Not treated |
R1‑120838 | Correction to the power control of PUSCH and PUCCH | LG Electronics | Withdrawn |
R1‑120839 | Enhancements for CoMP Scenario 3 Uplink Power Control | HTC | Not treated |
R1‑120840 | 36.213 CR0376 (Rel-10, Cat F) on RNTI Configuration associated with DL Resource Allocation Type 2 | Motorola Mobility | Noted - Revised |
R1‑120841 | LS reply on parallel transmissions of PRACH and PUSCH/PUCCH/SRS | RAN1, Huawei | Agreed |
R1‑120842 | Enhancement on Periodic CSI Transmission for Carrier Aggregation | LG Electronics | Not treated |
R1‑120843 | Way forward on HARQ-ACK enhancements in Rel-11 | CATT | Withdrawn |
R1‑120844 | 25.214 CR0664R1 (Rel-10, F) Clarification of UL DPCCH Slot Format when DPC_Mode is 1 and CPC is not Enabled | Qualcomm Incorporated | Agreed |
R1‑120845 | 25.214 CR0669 (Rel-11, A) Clarification of UL DPCCH Slot Format when DPC_Mode is 1 and CPC is not Enabled | Qualcomm Incorporated | Agreed |
R1‑120846 | DRAFT LS on Summary of RAN1 agreements on Closed Loop Transmit Diversity | Qualcomm | Noted - Revised |
R1‑120847 | 25.212 CR0304R1 (Rel-11, F) Introduction of 8C-HSDPA CQI report mapping scenarios table | Nokia Siemens Networks | Agreed |
R1‑120848 | 25.211 DraftCR0294 (Rel-11, F) Corrections to Uplink Closed Loop Transmit Diversity | Qualcomm Incorporated | Noted |
R1‑120849 | 25.212 CR0305 (Rel-11, F) Corrections to Uplink Closed Loop Transmit Diversity | Qualcomm Incorporated | Agreed |
R1‑120850 | 25.213 CR0111 (Rel-11, F) Corrections to Uplink Closed Loop Transmit Diversity | Qualcomm Incorporated | Agreed |
R1‑120851 | 25.214 CR0670 (Rel-11, F) Corrections to Uplink Closed Loop Transmit Diversity | Qualcomm Incorporated | Agreed |
R1‑120852 | Simulation Assumption for CELL_FACH TDM evaluation | Ericsson | Agreed |
R1‑120853 | 25.211 CR0290R1 (Rel-8, F) Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Noted - Revised |
R1‑120854 | 25.211 CR0291 (Rel-9, A) Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑120855 | 25.211 CR0292 (Rel-10, A) Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑120856 | 25.211 CR0293 (Rel-11, A) Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑120857 | 25.211 CR0290R2 (Rel-8, F) Clarification of F-DPCH transmission in STTD mode in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑120858 | Summary of 4-branch MIMO for HSPA session | HSPA session chairman (Huawei) | Endorsed |
R1‑120859 | LS on Summary of RAN1 agreements on Closed Loop Transmit Diversity | RAN1, Qualcomm | Agreed |
R1‑120860 | 25.214 CR0671 (Rel-11, A) Further Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH | Qualcomm Incorporated | Agreed |
R1‑120861 | void | - | Withdrawn |
R1‑120862 | void | - | Withdrawn |
R1‑120863 | void | - | Withdrawn |
R1‑120864 | Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization | ITU-T Study Group 15 | Noted |
R1‑120865 | Way forward on CoMP measurement set selection | CATT, Nokia, Nokia Siemens Networks, Qualcomm, ZTE | Noted |
R1‑120866 | Way Forward on CSI Feedback for CoMP | Huawei, CATT, CMCC, HiSilicon, Hitachi, Intel, LG Electronics, New Postcom, Sharp, ZTE | Revised |
R1‑120867 | Way Forward on UL Power Control for CoMP | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Qualcomm, HTC | Noted |
R1‑120868 | WF on CSI-RS based measurement | Samsung, Ericsson, ETRI, Huawei, HiSilicon, Hitachi, HTC, Intel, InterDigital, KDDI, LG Electronics, MediaTek, NEC Group, NewPostcom, Panasonic, Pantech, RIM, SHARP, ST-Ericsson, Broadcom, AT&T | Noted - Revised |
R1‑120869 | Way Forward on DMRS sequence initialization | ZTE, CATT, Samsung, LG Electronics, HTC, InterDigital, Ericsson, ST-Ericsson | Noted |
R1‑120870 | DMRS sequences for ePDCCH | Huawei, HiSilicon | Noted |
R1‑120871 | [Draft] LS on CoMP Configuration | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120872 | Way forward on inter-band TDD CA in Rel-11 | CATT, Huawei, HiSilicon, Qualcomm, ZTE, Intel, Potevio | Noted |
R1‑120873 | Email discussion summary on Inter-band CA for supporting different TDD UL-DL configuration | CMCC | Noted |
R1‑120874 | Considerations on RS for E-PDCCH | LG Electronics | Noted |
R1‑120875 | WF on multiple SRS configurations with different power control | LG Electronics, Fujitsu, Panasonic, Pantech, Qualcomm, ZTE | Not treated |
R1‑120876 | Way Forward on PUCCH resource management for UL-CoMP | LG Electronics, Huawei, HiSilicon, Nokia, NSN, Panasonic, Pantech, Qualcomm, [ZTE] | Not treated |
R1‑120877 | WF on basic building block of ePDCCH - eCCE | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, Huawei, HiSilicon, Nokia, NSN, Panasonic, Potevio, Sharp | Not treated |
R1‑120878 | WF on UL DMRS for CoMP | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑120879 | Discussion on enhancement for periodic CSI | ZTE | Not treated |
R1‑120880 | Summary of ad-hoc session on AI 6.4 Further Enhancements for Cell_FACH | Rapporteur (Alcatel-Lucent) | Endorsed |
R1‑120881 | Channel Selection TxD Way Forward | Research In Motion UK Limited | Noted |
R1‑120882 | Details on UL DMRS | Ericsson/ST-Ericsson | Noted |
R1‑120883 | Way Forward on TxD of PUCCH format 1b with channel selection | Huawei, HiSilicon, Samsung, ZTE | Noted |
R1‑120884 | Joint proposal on DL assignment placement in E-PDCCH | LG Electronics, Qualcomm, Nokia, Nokia Siemens Networks, Panasonic | Noted |
R1‑120885 | WF on ePDCCH Multiplexing | InterDigital, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ETRI, Ericsson, ST-Ericsson, Renesas, Texas Instruments, NTT DoCoMo, Pantech, Broadcom, Intel, Research In Motion | Noted |
R1‑120886 | Way forward on UL DM RS | Samsung, Ericsson, ST-Ericsson, Huawei, HiSilicon, Intel, ITRI, KDDI, New Postcom, Sharp, Pantech | Noted |
R1‑120887 | Views on restriction of physical layer simplifications to low performance MTC UEs | Orange, Telecom Italia | Noted |
R1‑120888 | Signaling support for non-zero transmission power ABS | NEC Group | Not treated |
R1‑120889 | LS on the introduction of extended UE capabilities for dual mode Ues | RAN2, Qualcomm | Noted |
R1‑120890 | Way Forward on Network Assistance to simplify UE implementation under a large CRE bias | LG Electronics, Texas Instruments, Pantech | Noted |
R1‑120891 | 36.888 v0.2.0 | Vodafone Group | Endorsed |
R1‑120892 | Text proposal for evaluation methodology on link budget | Huawei, HiSilicon | Noted - Revised |
R1‑120893 | Concept of E-PDCCH CCE | LG Electronics | Not treated |
R1‑120894 | Text proposal for evaluation methodology on cell spectral efficiency | Huawei, HiSilicon | Agreed |
R1‑120895 | WF on CSI-RS based measurement | Samsung, Ericsson, ETRI, Huawei, HiSilicon, Hitachi, HTC, HT mMobile, Intel, InterDigital, KDDI, LG Electronics, MediaTek, NEC Group, NewPostcom, Panasonic, Pantech, RIM, SHARP, ST-Ericsson, Broadcom, AT&T | Noted |
R1‑120896 | Draft LS on CSI-RS based measurement for CoMP | Samsung, Ericsson, ST-Ericsson | Revised |
R1‑120897 | Search space design for E-PDCCH | ETRI | Not treated |
R1‑120898 | WF on Reduced Power ABS | DoCoMo, Ericsson, LG Electronics, Qualcomm, Samsung, ST Ericsson, ZTE | Noted |
R1‑120899 | Way Forward on Interference Avoidance in FeICIC | Texas Instruments, Huawei, HiSilicon, LG Electronics, ZTE | Noted |
R1‑120900 | Way forward on uplink coverage enhancement | ZTE, China Telecom, Orange, InterDigital, Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, Hisilicon, Ericsson, ST-Ericsson, CATT, CMCC, China Unicom | Agreed |
R1‑120901 | Way Forward on CSI Feedback for CoMP | Huawei, CATT, CMCC, ETRI, KDDI, HiSilicon, Hitachi, Intel, LG Electronics, New Postcom, Sharp, ZTE | Noted |
R1‑120902 | Draft LS on intra-eNB CoMP CSI feedback | Huawei | Not treated |
R1‑120903 | WF on ePDCCH search space | CATT, ITRI, NEC, Nokia, NSN, Panasonic, Potevio, Samsung, Sharp | Noted |
R1‑120904 | TR36.824 v0.1.0 LTE Coverage Enhancements | China Telecom (Rapporteur) | Agreed |
R1‑120905 | Way Forward on E-PDCCH Reference Signals | LG Electronics, CATT, Texas Instruments | Noted |
R1‑120906 | 36.213 CR0377 (Rel-10, F) for ACK/NACK related procedure in case of TDD UL-DL configuration 0 | LGE | Noted - Revised |
R1‑120907 | Way forward on ePDCCH reference signals | Ericsson, ST-Ericsson, NTT Docomo, Interdigital | Noted |
R1‑120908 | Draft LS on CSI-RS based measurement for CoMP | Samsung, Ericsson, ST-Ericsson | Noted - Revised |
R1‑120909 | Text proposal on reduction of maximum bandwidth for Section 6.2 of TR 36.888 | Alcatel-Lucent (Rapporteur) | Agreed |
R1‑120910 | Summary of CoMP UL session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑120911 | Summary of AI 7.2.1.3-7.2.1.5 session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑120912 | Chairman’s Notes on DL RS for CoMP | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑120913 | Chairman’s Notes on FeICIC | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑120914 | Chairman’s Notes on RS for E-PDCCH | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑120915 | [Draft] LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA | Panasonic | Noted - Revised |
R1‑120916 | Draft LS response of MDT UL coverage use case | Huawei | Noted - Revised |
R1‑120917 | LS on feICIC | Qualcomm Incorporated | Noted - Revised |
R1‑120918 | Proposal on PUSCH/PUCCH transmission with multiple TA | LG Electronics, Panasonic, Ericsson, ST-Ercisson, Pantech, Texas Instruments | Noted |
R1‑120919 | Proposal on SRS transmission with multiple TA | LG Electronics, ZTE, Pantech, CATT | Noted |
R1‑120920 | Chairman’s notes of the UTRA maintenance, MIMO with 64QAM for HSUPA and LCR TDD HSPA feedback and signaling efficiency enhancement study sessions | HSPA session chairman (Nokia Siemens Networks) | Endorsed |
R1‑120921 | RAN1-related FGI bits and capabilities that may be allowed to be different for FDD and TDD | Qualcomm Incorporated | Endorsed |
R1‑120922 | LS on the feasibility of applying different UL-DL configurations in multi-cell scenarios | RAN4, CATT | Noted |
R1‑120923 | LS response of MDT UL Coverage Use Case | RAN1, Huawei | Agreed |
R1‑120924 | RAN1 feedbacks on Preparation Work in 3GPP for ITU related to Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | RAN1, Telecom Italia | Agreed |
R1‑120925 | Text Proposal for section 5.3 of 3GPP TR 36.888 | Vodafone Group | Noted - Revised |
R1‑120926 | [DRAFT] Reply LS on Capability handling of LTE TDD and FDD modes | Qualcomm Incorporated | Noted - Revised |
R1‑120927 | LS on feICIC | RAN1, Qualcomm Incorporated | Agreed |
R1‑120928 | Reply LS on Capability handling of LTE TDD and FDD modes | RAN1, Qualcomm Incorporated | Agreed |
R1‑120929 | LS on CSI-RS based measurement for CoMP | RAN1, Samsung, Ericsson | Agreed |
R1‑120930 | 36.888 v0.3.0 | Vodafone Group | Noted - Revised |
R1‑120931 | 36.212 CR0133R1 (Rel-10, F) Correction of two HARQ-ACK feedback on PUSCH | Samsung, Ericsson, ST-Ericsson, NEC, Qualcomm | Agreed |
R1‑120932 | 36.212 CR0134 (Rel-10, F) Some corrections for TS36.212 | ITRI, Potevio | Noted - Revised |
R1‑120933 | 36.212 CR0132R2 (Rel-10, F) Corrections on payload size adjustment for DCI format 1A and 1 | Huawei, HiSilicon, ZTE, Panasonic, Ericsson, ST-Ericsson, Texas Instruments, Fujitsu, Qualcomm, Samsung | Agreed |
R1‑120934 | 36.212 CR0135 (Rel-10, F) Clarification on the HARQ-ACK reporting scheme | ITRI | Withdrawn |
R1‑120935 | 36.213 CR0376R1 (Rel-10, Cat F) on RNTI Configuration associated with DL Resource Allocation Type 2 | Motorola Mobility | Agreed |
R1‑120936 | 36.213 CR0377R1 (Rel-10, F) Correction for ACK/NACK related procedure in case of TDD UL-DL configuration 0 | LGE | Noted - Revised |
R1‑120937 | 36.213 CR0377R2 (Rel-10, F) Correction for ACK/NACK related procedure in case of TDD UL-DL configuration 0 | LGE, ITRI, CATT, TI | Agreed |
R1‑120938 | 36.212 CR0134R1 (Rel-10, F) Miscellaneous corrections | ITRI, Potevio | Agreed |
R1‑120939 | Text Proposal for section 5.3 of 3GPP TR 36.888 | Vodafone Group | Agreed |
R1‑120940 | Text proposal for evaluation methodology on link budget | Huawei, HiSilicon | Agreed |
R1‑120941 | TR36.824 v1.0.0 LTE Coverage Enhancements | China Telecom (Rapporteur) | Agreed |
R1‑120942 | Simulation conditions for discontiuous CQI reporting | TD Tech | Agreed |
R1‑120943 | Email discussion on Reference Signals for the New Carrier Type [68-06] | Rapporteur (Alcatel-Lucent) | Agreed |
R1‑120944 | Simulation Assumptions for UL MIMO with 64QAM | Rapporteur (Ericsson, ST-Ericsson) | Agreed |
R1‑120945 | 36.888 v1.0.0 | Vodafone Group | Endorsed |
R1‑120946 | LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA | RAN1, Panasonic | Agreed |
R1‑120947 | Conclusions from evaluation results for isolated cell scenario for TDD IMTA | Rapporteur (CATT) | Agreed |
R1‑120948 | Simulation assumptions for multi-cell scenarios for TDD IMTA | Rapporteur (CATT) | Agreed |
R1‑120949 | Text proposal on analysis of peak rate reduction for Section 6.4 of TR 36.888 | Huawei | Agreed |
page generated from database: 2024-07-20 12:15:34