3GPP TDocs (written contributions) at meeting
Meeting: C4-49b - 2010-06-28 to 2010-07-02, Dublin
meeting id: C4-49b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C4‑101612 | Preliminary agenda for CT4 #49bis | CT4 chairman | Revised |
C4‑101613 | Detailed agenda & time plan for CT4#49bis: status at document deadline | CT4 chairman | Revised |
C4‑101614 | Detailed agenda & time plan for CT4#49bis: status on eve of meeting | CT4 chairman | Agreed |
C4‑101615 | Proposed allocation of documents to agenda items for CT4#49bis: status at document deadline | CT4 chairman | Revised |
C4‑101616 | Proposed allocation of documents to agenda items for CT4#49bis status on eve of meeting | CT4 chairman | Agreed |
C4‑101617 | Chairman report from CT & SA meeting number 48 | Chairman | Noted |
C4‑101618 | Conclusions on use of BSS Id | Ericsson | Noted |
C4‑101619 | Correction to Global Call Reference IE Definition | Ericsson | Revised |
C4‑101620 | Correction and Clarifications to Clause 9.2.2 (Possible options to reduce BSS processing for call leg correlations) | Ericsson | Revised |
C4‑101621 | Corrections to Inter-BSS Handover | Ericsson | Revised |
C4‑101622 | Basic call establishment sequence when "GCR only" method is used | Ericsson | Revised |
C4‑101623 | Mid-Call Announcements | Ericsson | Withdrawn |
C4‑101624 | Mid-Call Announcement Solution Using Out Of Band Control | Ericsson | Revised |
C4‑101625 | Handovers duringCall Establishment With Handover | Ericsson | Revised |
C4‑101626 | Simultaneous Handovers | Ericsson | Revised |
C4‑101627 | New Information Elements and Control Flags for LCLS | Ericsson | Revised |
C4‑101628 | Serving Network semantics | Nokia Siemens Networks | Revised |
C4‑101629 | Correction of GUTI format | Deutsche Telekom | Revised |
C4‑101630 | Correction of GUTI format | Deutsche Telekom | Revised |
C4‑101631 | Usage of IMSI and IMPI over Sh | Ericsson, Deutsche Telekom | Withdrawn |
C4‑101632 | Usage of IMSI and IMPI over Sh | Ericsson, Deutsche Telekom | Withdrawn |
C4‑101633 | Discussion paper for wildcarded identities handling | Ericsson | Noted |
C4‑101634 | Wildcarded Identity handling | Ericsson | Revised |
C4‑101635 | Wildcarded Identity handling | Ericsson | Revised |
C4‑101636 | Wildcarded Identity handling | Ericsson | Withdrawn |
C4‑101637 | Wildcarded Identity handling | Ericsson | Withdrawn |
C4‑101638 | PSI identification for AS services | Ericsson | Revised |
C4‑101639 | PSI identification for AS services | Ericsson | Revised |
C4‑101640 | Tserviceprofile sequence not aligned to XML schema | Ericsson | Agreed |
C4‑101641 | Tserviceprofile sequence not aligned to XML schema | Ericsson | Agreed |
C4‑101642 | Optional capabilities handling | Ericsson | Postponed |
C4‑101643 | Optional capabilities handling | Ericsson | Postponed |
C4‑101644 | Reference to SCTP IETF RFC obsolete | Ericsson, Orange | Agreed |
C4‑101645 | Reference to SCTP IETF RFC obsolete | Ericsson, Orange | Agreed |
C4‑101646 | Reference to SCTP IETF RFC obsolete | Ericsson, Orange | Agreed |
C4‑101647 | PCR on A-interface signalling | Nokia Siemens Networks | Revised |
C4‑101648 | PCR on mid-call announcements | Nokia Siemens Networks | Revised |
C4‑101649 | PCR on lawful interception and bicasting | Nokia Siemens Networks | Revised |
C4‑101650 | PCR on Inter-MSC handovers | Nokia Siemens Networks | Revised |
C4‑101651 | PCR to correct LCLS capability indication and handover failure | Nokia Siemens Networks | Revised |
C4‑101652 | PCR One minor CN solution not feasible | Nokia Siemens Networks | Revised |
C4‑101653 | Correction of Cx-MAR in restoration procedures | Ericsson | Withdrawn |
C4‑101654 | Correction of Cx-MAR in restoration procedures | Ericsson | Withdrawn |
C4‑101655 | UDC: Data for HSS-IMS reference data model | Ericsson | Postponed |
C4‑101656 | UDC: Data for HLR reference data model | Ericsson | Revised |
C4‑101657 | UDC: enhancements on collision detection control | Ericsson | Revised |
C4‑101658 | UDC: enhancements on subscriptions | Ericsson | Revised |
C4‑101659 | Pseudo-CR on User Plane handling | ZTE, Huawei, CMCC | Revised |
C4‑101660 | Pseudo-CR on inter MSC handover when break LCLS | ZTEHuawei | Revised |
C4‑101661 | P-CR on Inter-BSS Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101662 | P-CR on Inter-MSC Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101663 | Discussion on Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Noted |
C4‑101664 | P-CR on Simultaneous Handover in Both Sides by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101665 | P-CR on GCRBSS Id solution compatibility clarifications | ZTE, Huawei | Revised |
C4‑101666 | P-CR on adding call state model for handover | ZTE, Huawei | Withdrawn |
C4‑101667 | P-CR on complete pros and cons in handover and call establishment solutions | ZTE, Huawei | Postponed |
C4‑101668 | Way forward on support of BSS ID | ZTE, Huawei, CMCC, Motorola | Noted |
C4‑101669 | UDC Data Model | ZTE | Noted |
C4‑101670 | MME/SGN Restart | ZTE | Postponed |
C4‑101671 | MME/SGSN Restart | ZTE | Postponed |
C4‑101672 | MME/SGSN Restart | ZTE | Postponed |
C4‑101673 | AliasIdentityGroupID Allocation | ZTE | Withdrawn |
C4‑101674 | UE-AMBR and APN-AMBR for Gn/Gp SGSN | ZTE | Revised |
C4‑101675 | Context Response for the UE with emergency bearers | ZTE | Withdrawn |
C4‑101676 | Context Response for the UE with emergency bearers | ZTE | Withdrawn |
C4‑101677 | Originating Node | ZTE | Agreed |
C4‑101678 | Originating Node | ZTE | Agreed |
C4‑101679 | Condition of ISRAI Flag | ZTE | Revised |
C4‑101680 | Condition of ISRAI Flag | ZTE | Revised |
C4‑101681 | PDN Connection for Subscription Data Change | ZTE | Revised |
C4‑101682 | PDN Connection for Subscription Data Change | ZTE | Revised |
C4‑101683 | Subscription to Notifications for the Empty Repository Data | ZTE | Revised |
C4‑101684 | Subscription to Notifications for the Empty Repository Data | ZTE | Revised |
C4‑101685 | Subscription to Notifications for the Empty Repository Data | ZTE | Revised |
C4‑101686 | Correction to the Value of Data-Reference AVP | ZTE | Agreed |
C4‑101687 | Correction to the Value of Data-Reference AVP | ZTE | Revised |
C4‑101688 | Empty Repository Data in Sh-Pull Response | ZTE | Rejected |
C4‑101689 | Empty Repository Data in Sh-Pull Response | ZTE | Rejected |
C4‑101690 | Empty Repository Data in Sh-Pull Response | ZTE | Rejected |
C4‑101691 | LCLS connection control in BSS | Huawei, ZTE Corporation | Withdrawn |
C4‑101692 | Call establishment and LCLS signalling for GCR plus mandatory support of BSS ID solution | Huawei, ZTE Corporation, China Mobile | Revised |
C4‑101693 | Open issues for GCR plus optional support of BSS ID solution during call establishment | Huawei, ZTE Corporation | Revised |
C4‑101694 | Updated WID for UDC Data Model | Huawei | Withdrawn |
C4‑101695 | SIPTO Permission Indicator | Huawei | Revised |
C4‑101696 | SIPTO Permission Indicator | Huawei | Withdrawn |
C4‑101697 | SIPTO Permission Indicator | Huawei | Revised |
C4‑101698 | Discussion on Compression of Data over Cx and Sh Interfaces | Huawei | Noted |
C4‑101699 | Subscription and Notification Messages | Huawei | Revised |
C4‑101700 | Usage of IMSI and IMPI for user identification on the Sh interface | Deutsche Telekom, Nokia Siemens Networks, Ericsson | Revised |
C4‑101701 | Usage of IMSI and IMPI for user identification on the Sh interface | Deutsche Telekom, Nokia Siemens Networks, Ericsson | Revised |
C4‑101702 | Clarification for Create Session Response | CATT | Revised |
C4‑101703 | Alignment for SRB-Only PS HO | CATT | Revised |
C4‑101704 | Introduction of SIPTO at S6a/S6d | CATT | Withdrawn |
C4‑101705 | UDC Reference Architecture | Nokia Siemens Networks | Revised |
C4‑101706 | Sending of MME name or SGSN Number to the VLR during the data restoration procedure | Nokia Siemens Networks, Alcatel-Lucent | Revised |
C4‑101707 | IP address IE clarification | Ericsson | Revised |
C4‑101708 | IP address IE clarification | Ericsson | Revised |
C4‑101709 | Cleanup of hanging PDN connections | Ericsson | Withdrawn |
C4‑101710 | MME/S4-SGSN node failure | Ericsson | Noted |
C4‑101711 | An exception to use GTPv2 | Ericsson | Revised |
C4‑101712 | Exception to use GTPv1 | Ericsson | Revised |
C4‑101713 | IEs to be included in rejection response messages | Ericsson | Agreed |
C4‑101714 | Ambiguity for encoding MBR/GBR | Ericsson | Revised |
C4‑101715 | Wrong reference to DRX parameter | Ericsson | Agreed |
C4‑101716 | Selection Mode | Ericsson | Agreed |
C4‑101717 | NAI for Mobility protocol | Ericsson | Postponed |
C4‑101718 | NAI for Mobility protocol | Ericsson | Postponed |
C4‑101719 | New Modify Access Bearers procedure | Alcatel-Lucent | Revised |
C4‑101720 | SIPTO permissions storage | Alcatel-Lucent | Withdrawn |
C4‑101721 | Addition of SIPTO permissions in PS subscription data | Alcatel-Lucent | Revised |
C4‑101722 | Addition of SIPTO permissions in PS subscription data | Alcatel-Lucent | Revised |
C4‑101723 | Data Restoration for SMS | Alcatel-Lucent | Revised |
C4‑101724 | Data Restoration for SMS | Alcatel-Lucent | Revised |
C4‑101725 | Restoration of the SGSN Number in the VLR | Alcatel-Lucent, Nokia Siemens Networks | Revised |
C4‑101726 | TMSI storage in SGSN and MME | Alcatel-Lucent | Postponed |
C4‑101727 | Notification of supported features between peer GTP-C entities | Alcatel-Lucent | Revised |
C4‑101728 | Restoration Data Backup | Nokia Siemens Networks | Postponed |
C4‑101729 | Restoration Data Backup | Nokia Siemens Networks | Postponed |
C4‑101730 | S6a Error Diagnostic | Nokia Siemens Networks | Postponed |
C4‑101731 | XML schema correction | Nokia Siemens Networks | Withdrawn |
C4‑101732 | Discussion on IMS voice call termination when EPC node restarted | NTT DOCOMO | Noted |
C4‑101733 | IMS voice call termination when EPC node restarted | NTT DOCOMO | Postponed |
C4‑101734 | IMS voice call termination when EPC node restarted | NTT DOCOMO | Postponed |
C4‑101735 | IMS voice call termination when EPC node restarted | NTT DOCOMO | Postponed |
C4‑101736 | IMS voice call termination when EPC node restarted | NTT DOCOMO | Postponed |
C4‑101737 | Skeleton for TR 29.935 "Study on UDC Data Model" | Telecom Italia | Revised |
C4‑101738 | Scope for TR 29.935 | Telecom Italia | Revised |
C4‑101739 | NIMTC Status | Ericsson, ST-Ericsson | Noted |
C4‑101740 | Fix Sudden disconnection after the inter RAT MM attempt | NEC | Revised |
C4‑101741 | Introduction of the DLDTA (Down Link Data Triggered Attach) function | NEC | Noted |
C4‑101742 | Pro-active solution for MME restoration | NEC | Noted |
C4‑101743 | GW Selection | Huawei | Withdrawn |
C4‑101744 | Partial Failure Handling for full node failure | Huawei | Postponed |
C4‑101745 | CSG Info Change Reporting Action | Huawei | Revised |
C4‑101746 | Stop CSG Information Reporting | Huawei | Revised |
C4‑101747 | RAU Procedure | Huawei | Agreed |
C4‑101748 | Suspend message on S3 interface | Huawei | Agreed |
C4‑101749 | SGW ISR Capability | Huawei | Postponed |
C4‑101750 | Cause value in Detach Notification | Huawei | Revised |
C4‑101751 | Cause value in Detach Notification | Huawei | Revised |
C4‑101752 | S1 Based handover cancel | Huawei | Revised |
C4‑101753 | S1 Based handover cancel | Huawei | Revised |
C4‑101754 | Used NAS integrity protection algorithm values | Huawei | Revised |
C4‑101755 | Used NAS integrity protection algorithm values | Huawei | Revised |
C4‑101756 | Disc on TAU with active flag | Huawei | Noted |
C4‑101757 | TAU with active flag | Huawei | Withdrawn |
C4‑101758 | TAU with active flag | Huawei | Revised |
C4‑101759 | Indicating the suspension of dedicated bearer related procedure from MME to SGW, PGW | Cisco | Postponed |
C4‑101760 | Indicating the suspension of dedicated bearer related procedure from MME to SGW, PGW | Cisco | Postponed |
C4‑101761 | Essential correction to MS Info Change Notification Request | Cisco | Withdrawn |
C4‑101762 | Essential correction to MS Info Change Notification Request | Cisco | Revised |
C4‑101763 | Essential correction to MS Info Change Notification Request | Cisco | Revised |
C4‑101764 | Essential correction to Change Notification Response message handling | Cisco | Withdrawn |
C4‑101765 | Essential correction to Change Notification Response message handling | Cisco | Withdrawn |
C4‑101766 | Clarification of F-TEID interface type usage | Hitachi | Withdrawn |
C4‑101767 | MME failure and restart: Handling the ECM-IDLE mode UE | Cisco | Noted |
C4‑101768 | Definition of the SIPTO flag for the S6a interface | Qualcomm Incorporated | Withdrawn |
C4‑101769 | Definition of the SIPTO flag for MAP | Qualcomm Incorporated | Withdrawn |
C4‑101770 | Data reference model and types of application | Alcatel-Lucent | Withdrawn |
C4‑101771 | UDC Evolution skeleton | Alcatel-Lucent | Agreed |
C4‑101772 | UDC Evolution scope | Alcatel-Lucent | Revised |
C4‑101773 | Multiple UDRs | Alcatel-Lucent | Agreed |
C4‑101774 | Shared data | Alcatel-Lucent | Revised |
C4‑101775 | Notifications and transactions | Alcatel-Lucent | Revised |
C4‑101776 | Sh procedures with multiple write | Alcatel-Lucent, | Noted |
C4‑101777 | Facilitating efficient call leg correlation in the BSC | Motorola | Noted |
C4‑101778 | Pseudo-CR Include SCCP id of oBSC in Call Reference Id field of the GCR used for LCLS | Motorola | Revised |
C4‑101779 | Essential corrections to GUTI mapping | Motorola | Revised |
C4‑101780 | Trace Report File LDNs | Motorola | Revised |
C4‑101781 | Change Notification | Motorola | Revised |
C4‑101782 | Change Notification | Motorola | Revised |
C4‑101783 | MTU Size | Motorola | Postponed |
C4‑101784 | MTU Size | Motorola | Postponed |
C4‑101785 | Scope of Local Call Local Switch in Release 10 | Vodafone | Withdrawn |
C4‑101786 | LS on the impacts to the BSS by using GCR make call correlation | TSG GERAN WG2 | Noted |
C4‑101787 | Response LS on Transfer of SPID during (inter-RAT) handover | TSG RAN WG3 | Noted |
C4‑101788 | LS on Coding of UE AMBR, MBR and GBR | TSG RAN WG3 | Noted |
C4‑101789 | Reply LS on Update on status of Service User Profile Management | TSG SA WG1 | Noted |
C4‑101790 | LS on progress of enhanced vocoder work | TSG SA WG2 | Postponed |
C4‑101791 | LS to CT1 on Addition of PSTN-ISDN Emulation Support to AoC Service | TSG SA WG5 | Noted |
C4‑101792 | Pseudo-CR on Study on UDC Data Model: HLR-HSS reference data model | Nokia Siemens Networks | Withdrawn |
C4‑101793 | Subscription to Notifications for the Empty Repository Data | ZTE | Withdrawn |
C4‑101794 | Subscription to Notifications for the Empty Repository Data | ZTE | Withdrawn |
C4‑101795 | Subscription to Notifications for the Empty Repository Data | ZTE | Withdrawn |
C4‑101796 | Essential corrections to GUTI mapping | Motorola | Revised |
C4‑101797 | Fix Sudden disconnection after the inter RAT MM attempt | NEC | Revised |
C4‑101798 | Subscription and Notification Messages | Huawei | Revised |
C4‑101799 | Corrections to Inter-BSS Handover | Ericsson | Revised |
C4‑101800 | Simultaneous Handovers | Ericsson | Agreed |
C4‑101801 | Discussion 23.889 Comparison on use of BSS-ID | Huawei, ZTE | Noted |
C4‑101802 | Sending of MME name or SGSN Number to the VLR during the data restoration procedure | Nokia Siemens Networks, Alcatel-Lucent | Agreed |
C4‑101803 | Restoration of the SGSN Number in the VLR | Alcatel-Lucent, Nokia Siemens Networks | Agreed |
C4‑101804 | Data Restoration for SMS | Alcatel-Lucent | Agreed |
C4‑101805 | Data Restoration for SMS | Alcatel-Lucent | Agreed |
C4‑101806 | SIPTO Permission Indicator | Huawei, Alcatel-Lucent | Agreed |
C4‑101807 | Addition of SIPTO permissions in PS subscription data | Alcatel-Lucent, Huawei,CATT, Qualcomm, Ericsson | Agreed |
C4‑101808 | SIPTO Permission Indicator | Huawei | Agreed |
C4‑101809 | Addition of SIPTO permissions in PS subscription data | Alcatel-Lucent, Qualcomm, Huawei | Agreed |
C4‑101810 | Notification of supported features between peer GTP-C entities | Alcatel-Lucent | Revised |
C4‑101811 | PCR on mid-call announcements | Nokia Siemens Networks | Revised |
C4‑101812 | PCR on Inter-MSC handovers | Nokia Siemens Networks | Revised |
C4‑101813 | Correction to Global Call Reference IE Definition | Ericsson | Withdrawn |
C4‑101814 | Correction and Clarifications to Clause 9.2.2 (Possible options to reduce BSS processing for call leg correlations) | Ericsson | Agreed |
C4‑101815 | Corrections to Inter-BSS Handover when Break LCLS | ZTE | Revised |
C4‑101816 | Basic call establishment sequence when "GCR only" method is used | Ericsson | Revised |
C4‑101817 | Mid-Call Announcement Solution Using Out Of Band Control | Ericsson | Revised |
C4‑101818 | P-CR on Inter-BSS Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101819 | Handovers duringCall Establishment With Handover | Ericsson | Revised |
C4‑101820 | P-CR on Simultaneous Handover in Both Sides by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101821 | P-CR on Inter-MSC Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101822 | P-CR on GCRBSS Id solution compatibility clarifications | ZTE, Huawei | Revised |
C4‑101823 | New Information Elements and Control Flags for LCLS | Ericsson | Revised |
C4‑101824 | PCR on A-interface signalling | Nokia Siemens Networks | Postponed |
C4‑101825 | PCR on lawful interception and bicasting | Nokia Siemens Networks | Revised |
C4‑101826 | PCR on Inter-MSC handovers | Nokia Siemens Networks | Agreed |
C4‑101827 | PCR to correct LCLS capability indication and handover failure | Nokia Siemens Networks | Agreed |
C4‑101828 | PCR One minor CN solution not feasible | Nokia Siemens Networks | Agreed |
C4‑101829 | Pseudo-CR on inter MSC handover when break LCLS | ZTEHuawei | Revised |
C4‑101830 | Pseudo-CR on User Plane handling | ZTE, Huawei, CMCC | Revised |
C4‑101831 | Subscription and Notification Messages | Huawei | Agreed |
C4‑101832 | Reply LS on Update on status of Service User Profile Management | TSG SA WG5 | Noted |
C4‑101833 | UDC Reference Architecture | Nokia Siemens Networks | Agreed |
C4‑101834 | Skeleton for TR 29.935 "Study on UDC Data Model" | Telecom Italia | Agreed |
C4‑101835 | Scope for TR 29.935 | Telecom Italia | Agreed |
C4‑101836 | Revised WID on Study on UDC evolution | T-Mobile | Revised |
C4‑101837 | UDC Evolution scope | Alcatel-Lucent | Agreed |
C4‑101838 | UDC: enhancements on collision detection control | Ericsson | Agreed |
C4‑101839 | UDC: enhancements on subscriptions | Ericsson | Agreed |
C4‑101840 | Shared data | Alcatel-Lucent | Revised |
C4‑101841 | Correction of GUTI format | Deutsche Telekom | Postponed |
C4‑101842 | Correction of GUTI format | Deutsche Telekom | Postponed |
C4‑101843 | Essential corrections to GUTI mapping | Motorola | Revised |
C4‑101844 | New Modify Access Bearers procedure | Alcatel-Lucent | Revised |
C4‑101845 | Dual stack IP address | Ericsson | Revised |
C4‑101846 | Serving Network semantics | Nokia Siemens Networks | Revised |
C4‑101847 | UE-AMBR and APN-AMBR for Gn/Gp SGSN | ZTE | Agreed |
C4‑101848 | Clarification for Create Session Response | CATT | Postponed |
C4‑101849 | Alignment for SRB-Only PS HO | CATT, Motorola, TeliaSonera | Agreed |
C4‑101850 | P-CR on Inter-BSS Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101851 | P-CR on Inter-MSC Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101852 | P-CR on GCRBSS Id solution compatibility clarifications | ZTE, Huawei | Revised |
C4‑101853 | Call establishment and LCLS signalling for GCR plus mandatory support of BSS ID solution | Huawei, ZTE Corporation, China Mobile | Revised |
C4‑101854 | Open issues for GCR plus optional support of BSS ID solution during call establishment | Huawei, ZTE Corporation | Agreed |
C4‑101855 | Pseudo-CR Include SCCP id of oBSC in Call Reference Id field of the GCR used for LCLS | Motorola | Revised |
C4‑101856 | Corrections to Inter-BSS Handover | Ericsson | Agreed |
C4‑101857 | Corrections to Inter-BSS Handover when Break LCLS | ZTE | Agreed |
C4‑101858 | PCR on mid-call announcements | Nokia Siemens Networks | Agreed |
C4‑101859 | New Information Elements and Control Flags for LCLS | Ericsson | Revised |
C4‑101860 | PCR on lawful interception and bicasting | Nokia Siemens Networks | Agreed |
C4‑101861 | Handovers duringCall Establishment With Handover | Ericsson | Agreed |
C4‑101862 | Pseudo-CR on User Plane handling | ZTE, Huawei, CMCC | Agreed |
C4‑101863 | Pseudo-CR on inter MSC handover when break LCLS | ZTEHuawei | Revised |
C4‑101864 | Basic call establishment sequence when "GCR only" method is used | Ericsson | Revised |
C4‑101865 | Pseudo-CR on inter MSC handover when break LCLS | ZTEHuawei | Agreed |
C4‑101866 | P-CR on Inter-BSS Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Agreed |
C4‑101867 | P-CR on Inter-MSC Handover during call establishment by using GCR+BSS ID solution | ZTE, Huawei | Agreed |
C4‑101868 | P-CR on Simultaneous Handover in Both Sides by using GCR+BSS ID solution | ZTE, Huawei | Revised |
C4‑101869 | P-CR on GCRBSS Id solution compatibility clarifications | ZTE, Huawei | Agreed |
C4‑101870 | Pseudo-CR Include SCCP id of oBSC in Call Reference Id field of the GCR used for LCLS | Motorola | Agreed |
C4‑101871 | Ambiguity for encoding MBR/GBR | Ericsson | Revised |
C4‑101872 | Fix Sudden disconnection after the inter RAT MM attempt | NEC | Revised |
C4‑101873 | CSG Info Change Reporting Action | Huawei | Revised |
C4‑101874 | Stop CSG Information Reporting | Huawei | Revised |
C4‑101875 | Condition of ISRAI Flag | ZTE | Agreed |
C4‑101876 | Condition of ISRAI Flag | ZTE | Agreed |
C4‑101877 | PDN Connection for Subscription Data Change | ZTE | Agreed |
C4‑101878 | PDN Connection for Subscription Data Change | ZTE | Agreed |
C4‑101879 | IP address IE clarification | Ericsson | Revised |
C4‑101880 | IP address IE clarification | Ericsson | Revised |
C4‑101881 | An exception to use GTPv2 | Ericsson | Withdrawn |
C4‑101882 | An exception to use GTPv2 | Ericsson | Revised |
C4‑101883 | Cause value in Detach Notification | Huawei | Agreed |
C4‑101884 | Cause value in Detach Notification | Huawei | Agreed |
C4‑101885 | S1 Based handover cancel | Huawei | Agreed |
C4‑101886 | S1 Based handover cancel | Huawei | Agreed |
C4‑101887 | TAU with active flag | Huawei | Revised |
C4‑101888 | Essential correction to MS Info Change Notification Request | Cisco | Revised |
C4‑101889 | Essential correction to MS Info Change Notification Request | Cisco | Revised |
C4‑101890 | Change Notification | Motorola | Agreed |
C4‑101891 | Change Notification | Motorola | Agreed |
C4‑101892 | LS on wildcarded identities in the IMS CN | Ericsson | Revised |
C4‑101893 | Wildcarded Identity handling | Ericsson | Withdrawn |
C4‑101894 | Wildcarded Identity handling | Ericsson | Withdrawn |
C4‑101895 | PSI identification for AS services | Ericsson | Agreed |
C4‑101896 | PSI identification for AS services | Ericsson | Agreed |
C4‑101897 | Correction to the Value of Data-Reference AVP | ZTE | Agreed |
C4‑101898 | Correction to the Value of Data-Reference AVP | Alcatel-Lucent | Agreed |
C4‑101899 | Dual stack IP address | Ericsson | Agreed |
C4‑101900 | UDC: Data for HLR reference data model | Ericsson, Nokia Siemens Networks | Revised |
C4‑101901 | Revised WID on Study on UDC evolution | Deutsche Telekom, Telecom Italia | Agreed |
C4‑101902 | Notifications and transactions | Alcatel-Lucent | Agreed |
C4‑101903 | Used NAS integrity protection algorithm values | Huawei | Agreed |
C4‑101904 | Used NAS integrity protection algorithm values | Huawei | Agreed |
C4‑101905 | Trace Report File LDNs | Motorola | Agreed |
C4‑101906 | MME Failure Solution Analysis | CT4 Chairman | Noted |
C4‑101907 | Basic call establishment sequence when "GCR only" method is used | Ericsson | Agreed |
C4‑101908 | Mid-Call Announcement Solution Using Out Of Band Control | Ericsson | Agreed |
C4‑101909 | New Information Elements and Control Flags for LCLS | Ericsson | Agreed |
C4‑101910 | Call establishment and LCLS signalling for GCR plus mandatory support of BSS ID solution | Huawei, ZTE Corporation, China Mobile | Agreed |
C4‑101911 | New Version of the TR on LCLS 23.889 v1.4.0 | Vodafone | Agreed |
C4‑101912 | P-CR on Simultaneous Handover in Both Sides by using GCR+BSS ID solution | ZTE, Huawei | Agreed |
C4‑101913 | Not allocted | - | Noted |
C4‑101914 | Not allocted | - | Noted |
C4‑101915 | Not allocted | - | Noted |
C4‑101916 | Not allocted | - | Noted |
C4‑101917 | Not allocted | - | Noted |
C4‑101918 | Not allocted | - | Noted |
C4‑101919 | Not allocted | - | Noted |
C4‑101920 | IP address IE clarification | Ericsson | Agreed |
C4‑101921 | IP address IE clarification | Ericsson | Agreed |
C4‑101922 | An exception to use GTPv2 | Ericsson | Agreed |
C4‑101923 | TAU with active flag | Huawei | Agreed |
C4‑101924 | Essential correction to MS Info Change Notification Request | Cisco | Agreed |
C4‑101925 | Essential correction to MS Info Change Notification Request | Cisco | Agreed |
C4‑101926 | Serving Network semantics | Nokia Siemens Networks | Agreed |
C4‑101927 | Ambiguity for encoding MBR/GBR | Ericsson | Agreed |
C4‑101928 | Fix Sudden disconnection after the inter RAT MM attempt | NEC | Revised |
C4‑101929 | CSG Info Change Reporting Action | Huawei | Agreed |
C4‑101930 | Stop CSG Information Reporting | Huawei | Agreed |
C4‑101931 | Notification of supported features between peer GTP-C entities | Alcatel-Lucent | Revised |
C4‑101932 | Fix Sudden disconnection after the inter RAT MM attempt | NEC | Agreed |
C4‑101933 | LS on wildcarded identities in the IMS CN | Ericsson | Approved |
C4‑101934 | Essential corrections to GUTI mapping | Motorola | Agreed |
C4‑101935 | UDC: Data for HLR reference data model | Ericsson, Nokia Siemens Networks | Agreed |
C4‑101936 | TR 29.935 v0.1.0 | Telecom Italia | Agreed |
C4‑101937 | Shared data | Alcatel-Lucent | Agreed |
C4‑101938 | TR 23.845 v0.1.0 | Alcatel-Lucent | Agreed |
C4‑101939 | Notification of supported features between peer GTP-C entities | Alcatel-Lucent | Revised |
C4‑101940 | Output documents | CT4 Chairman | Noted |
page generated from database: 2024-07-20 12:15:34