3GPP TDocs (written contributions) at meeting
Meeting: GP-27 - 2005-11-07 to 2005-11-11, Atlanta
meeting id: GP-27 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑052326 | - | - | - |
GP‑052327 | - | - | - |
GP‑052328 | - | - | - |
GP‑052329 | - | - | - |
GP‑052330 | Means for selecting between different position determination approaches | Motorola | - |
GP‑052331 | GSM 710 – analysis of incorporation into 51.010 | Aeroflex | - |
GP‑052332 | - | PHILIPS | - |
GP‑052333 | - | - | - |
GP‑052334 | - | - | - |
GP‑052335 | - | - | - |
GP‑052336 | Deletion of all the TC in section 51.1 “RR/Paging” | Wavecom | - |
GP‑052337 | Deletion of some TC in section 51.2 “RR procedures on CCCH related to temporary block flow establishment” | Wavecom | - |
GP‑052338 | Deletion of some TC in section 51.3 “MAC/RLC Release” | Wavecom | - |
GP‑052339 | Section 50 : Changes due to test removal | Wavecom | - |
GP‑052340 | Potential Core Specification Conflict in 20.22.23 | Wavecom | - |
GP‑052341 | Removal of some 51.x tests | Wavecom | - |
GP‑052342 | CR 051.010-1 42.9.2.2.3Extended Dynamic Allocation / Uplink Transfer / configuration change / Reduction in number of uplink slots using PACKET UPLINK ASSIGNMENT. | Setcom | - |
GP‑052343 | CR 051.010-1 Section 52.9.2.1.4Extended Dynamic Allocation / Uplink Transfer / Normal / PACCH operation in downlink | Setcom | - |
GP‑052344 | CR 051.010-1 Section 41.3.1.2TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode | Setcom | - |
GP‑052345 | CR 051.010-1 Section 51.3.1.2TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode | Setcom | - |
GP‑052346 | CR 051.010-1 45.2.4.3 Network initiated PDP context activation request for an already activated PDP context (on the MS side) | Setcom | - |
GP‑052347 | CR 051.010-1 Section 51.2.5.3Packet access rejection / Interpretation of Extended RA i / Correct value of Extended RA i | Setcom | - |
GP‑052348 | Editorial correction to TC42.3.3.2.1 | NEC | - |
GP‑052349 | Removal of TC53.1.1.5 from TS 51.010-1 | NEC | - |
GP‑052350 | Removal of TC53.1.1.5 from table B1. | NEC | - |
GP‑052351 | Annex B: Correction to applicability for Extended Dynamic Allocation | Ericsson | - |
GP‑052352 | Editorial Changes for Extended Dynamic Allocation / Shifted USF test cases. | Ericsson | - |
GP‑052353 | Changes to Conformance Statement for Extended Dynamic Allocation test cases. | Ericsson | - |
GP‑052354 | - | - | - |
GP‑052355 | 46.2.2.4.1 - corrected for header compression | Ericsson | - |
GP‑052356 | 42.4.4.1 - Increase the value of NC_REPORTING_PERIOD_T | Ericsson | - |
GP‑052358 | 14.12.1.2 – Correction of power level for DCS 1800 /1900 MS | Rohde&Schwarz | - |
GP‑052359 | EGPRS 51 and GPRS 41 Optimistation Analysis | Wavecom | - |
GP‑052360 | 14.1.3, 14.1.4, 14.2.9, 14.4.3, 14.7.3, 14.7.4 – Tests reduction (tests deleted) | Aeroflex | - |
GP‑052361 | 14.4.16 – Removal of fixed test limits | Aeroflex | - |
GP‑052362 | 14.4.17 – Tests reduction | Aeroflex | - |
GP‑052363 | 14.4.8 – Correction of test limits | Aeroflex | - |
GP‑052364 | 14.5.1.2 – Corrections to test procedure | Aeroflex | - |
GP‑052365 | 14.5.1.4 – Corrections to test procedure | Aeroflex | - |
GP‑052366 | Applicability of 14.1.3, 14.1.4, 14.2.9, 14.4.3, 14.7.3, 14.7.4 – Tests reduction (tests deleted) | Aeroflex | - |
GP‑052367 | Applicability of 14.1.6, 14.2.5, 14.2.19 – Tests reduction | Aeroflex | - |
GP‑052368 | 14.2.19, 14.2.20, 14.4.17, 14.4.18 – clarification of Loop I operation | Aeroflex | - |
GP‑052369 | 14 – Remove reference to tests which no longer use fixed test limits. | Aeroflex | - |
GP‑052370 | Clarifications in 20.22.9 | Wavecom | - |
GP‑052371 | 53.1.1.24 – Bad implementation of previous CR | Wavecom | - |
GP‑052372 | 53.1.1.6 / 53.1.1.9 Changes to PICS/PIXIT part | Wavecom | - |
GP‑052373 | 53.1.1.13/15/16/21/22 Changes to PICS/PIXIT part | Wavecom | - |
GP‑052374 | 53.1.1.14 / 53.1.1.17 Update the procedure to deal ‘EGPRS 8PSK in Uplink’ PICS | Wavecom | - |
GP‑052375 | 53.1.1.18 / 53.1.1.20 Update the procedure to deal ‘EGPRS 8PSK in Uplink’ PICS | Wavecom | - |
GP‑052376 | 53.1.1.19 Update the procedure to deal ‘EGPRS 8PSK in Uplink’ PICS | Wavecom | - |
GP‑052377 | Section 41, update of some Conformance Requirements not in line with Core Specifications | Wavecom | - |
GP‑052378 | Update of the Applicability for some EGPRS TC | Wavecom | - |
GP‑052379 | WB AMRWork Plan Revision 3.2 | TIM, RIM, BenQ, Sony Ericsson | - |
GP‑052380 | 51010-1:Changes in the expected sequence of the testcase 41.3.3 | SASKEN | - |
GP‑052381 | 51010-1:Changes in the expected sequence of the testcase 42.1.2.1.10.1 | SASKEN | - |
GP‑052382 | 51010-1:Changes in the expected sequence of the testcase 42.1.2.1.8.1.4. | SASKEN | - |
GP‑052383 | 51010-1:Removal of PSI13 scheduling from the initial conditions of the testcase 42.3.1.1.9 | SASKEN | - |
GP‑052384 | 51010-1:Changes in the expected sequence of the testcase 44.2.1.1.5.3. | SASKEN | - |
GP‑052385 | 51010-1:Allowing the sending of PDP DEACTIVATE REQUEST while waiting for any extra SABMs in the testcase 46.1.2.2.1.5. | SASKEN | - |
GP‑052386 | 51010-1:Changes in the expected sequence of the testcase 46.1.2.2.3.1. | SASKEN | - |
GP‑052387 | 51010-1:Changes in the expected sequence of the testcase 51.3.3 | SASKEN | - |
GP‑052388 | 51010-1:Addition of an USF after the uplink assignment in step 3, of the testcase 52.1.2.1.10.1 | SASKEN | - |
GP‑052389 | 51010-1:Changes in the expected sequence of the testcase 52.1.2.1.8.1.4. | SASKEN | - |
GP‑052390 | CR 51.010-2 Correction of Table A.2 concering Ciphering Algorith A5/2 | CETECOM GmbH | - |
GP‑052391 | 14.16.1 - Inconsistency in GMSK Power Levels | Anite | - |
GP‑052392 | 20.22.9 – MS may access Carrier 2 after Test procedure | Anite | - |
GP‑052393 | 40.5 – Addition of R5 QOS Parameters to Test PDP Contexts. | Anite | - |
GP‑052394 | 50.5 – Addition of R5 QOS Parameters to Test PDP Contexts. | Anite | - |
GP‑052395 | 41.3.6.8 – All Packet System Information for Cell B is exchanged to Packet Downlink Dummy Control Block on PBCCH. The data trigger at Step1 is reduced to 1200 octets | Anite | - |
GP‑052396 | 51.3.6.8 - All Packet System Information for Cell B is exchanged to Packet Downlink Dummy Control Block on PBCCH. The data trigger at Step1 is reduced to 1200 octets | Anite | - |
GP‑052397 | 42.4.1.4- Step 8 is updated to allow for the DRX period for the first measurement report sent by the MS on moving to Idle mode ( for Rel4 and earlier). | Anite | - |
GP‑052398 | 42.4.5.4 & 42.4.5.9 - Ready timer is deactivated | Anite | - |
GP‑052399 | 42.4.5.8 – Test sequence modified to handle Packet Measurement Reports appropriately after MS enters NC2 mode. | Anite | - |
GP‑052400 | 42.4.8.4.1 and 42.4.8.4.3 – BS_PA_MFRMS parameter value is changed. | Anite | - |
GP‑052401 | 51.3.6.6, 51.3.6.7, 51.3.6.8, 51.3.6.9, 51.3.6.10 – EGPRS Test Cases incorrectly refer to GPRS messages and values. | Anite | - |
GP‑052402 | 53.1.1.24 - Change the no.of repetitions of steps 23 & 24 to 10 instead of 9. | Anite | - |
GP‑052403 | 70.8.1, 70.8.2, 70.8.3, 70.8.5.1, 70.8.5.2 – Correction to comment field of Expected Sequence; minor drafting errors | Anite | - |
GP‑052404 | 70.8.4.4, 70.8.4.5 – Correction to Reference Number in Specific Message Contents | Anite | - |
GP‑052405 | 70.9.2.1, 70.9.2.2, 70.9.3.1, 70.9.3.2 - Addition of PICS “Support of privacy option” | Anite | - |
GP‑052406 | 41.2.2.2 – Handling of timer T3146 | Anite | - |
GP‑052407 | 51.2.2.2 – Handling of timer T3146 | Anite | - |
GP‑052408 | 14.16 - GPRS receiver tests – Minimum number of “blocks “ for USF tests | Anite | - |
GP‑052409 | 14.18 - EGPRS receiver tests – Minimum number of “blocks “ for USF tests | Anite | - |
GP‑052410 | 14.18.1 - Inconsistency in GMSK Power Levels | Anite | - |
GP‑052411 | - | - | - |
GP‑052412 | DTM stage 2 alignments with stage 3.. | NEC | - |
GP‑052413 | Provision of MBMS parameters in “GPRS cell options” inband to CS connected DTM capable MS. | NEC | - |
GP‑052414 | Clarification to usage of uplink power control parameters provided on PACCH. | NEC | - |
GP‑052415 | CR 51.010-1 Section 20.22.30.1 Clarification of timing for requirement checks | Rohde & Schwarz | - |
GP‑052416 | CR 51.010-1 Section 20.22.30.2 - Clarification of timing for requirement checks | Rohde & Schwarz, Ericsson | - |
GP‑052417 | CR 51.010-1 Section 40.4.3.9 Conditional parameter check in Two Phase Access macro. | Rohde & Schwarz | - |
GP‑052418 | CR 51.010-1 Section 41.3.6.6 Clarification on the Access Type of Packet Resource Request in step 16. | - | - |
GP‑052419 | CR 51.010-1 Section 51.3.6.6 Clarification on the Access Type of Packet Resource Request in step 16. | - | - |
GP‑052420 | 41.3.6.8 removed PSI3/PSI3bis information from IC and ack. data. | Rohde & Schwarz | - |
GP‑052421 | 51.3.6.8 removed PSI3/PSI3bis information from IC and ack. data | Rohde & Schwarz | - |
GP‑052422 | CR 51.010-1 Section 41.3.6.9 missing steps to prevent retransmission of old LLC PDU and to handle inactive period | Rohde & Schwarz | - |
GP‑052423 | CR 51.010-1 Section 51.3.6.9 missing steps to prevent retransmission of old LLC PDU and to handle inactive period | Rohde & Schwarz | - |
GP‑052424 | CR 51.010-1 Section – 41.5.1.1.2.1Ambiguous note in step 4 removed | Rohde & Schwarz | - |
GP‑052425 | CR 51.010-1 Section – 51.5.1.1.2.1Ambiguous note in step 4 removed | Rohde & Schwarz | - |
GP‑052426 | CR 51.010-1 Section – 41.5.1.2.1.1Clarification of step 1 (ambiguous Note) | Rohde & Schwarz | - |
GP‑052427 | CR 51.010-1 Section – 51.5.1.2.1.1Clarification of step 1 (ambiguous Note) | Rohde & Schwarz | - |
GP‑052428 | 51.010-1 section 42.4.5.3 Step B18 and B35: Incorrect comment deleted | Rohde & Schwarz | - |
GP‑052429 | 51.010-1 section 42.4.5.5 Step 22: Incorrect comment deleted. | Rohde & Schwarz | - |
GP‑052430 | 51.010-1 section 42.4.5.7 Step 13: Incorrect comment deleted. | Rohde & Schwarz | - |
GP‑052431 | CR 51.010-1 section 42.4.8.5.1 Superfluous step removed from expected sequence | Rohde & Schwarz | - |
GP‑052432 | CR 51.010-1 Section 81.2.1.4, 81.2.2.1, 81.2.2.2 Incorrect references. | Rohde & Schwarz | - |
GP‑052433 | CR 51.010-1 Section 83.1.4.2, 83.1.4.3: Test procedure and the expected sequence are not aligned | Rohde & Schwarz | - |
GP‑052434 | CR 51.010-1 Section 83.1.6.4: Test procedure and Expected Sequence alignment | Rohde & Schwarz | - |
GP‑052435 | CR 51.010-1 Section 83.1.8.1 and 83.1.8.2 Removal both Test Cases | Rohde & Schwarz | - |
GP‑052436 | CR 51.010-1 Section 83.4.1.1: Test procedure and Expected Sequence alignment | Rohde & Schwarz | - |
GP‑052437 | CR 51.010-2 Section 83.1.8.1 and 83.1.8.2 Removal of both Test Cases | Rohde & Schwarz | - |
GP‑052438 | 70.9.4.6 - New Test Case for MS-Based A-GPS: RR Management Commands | Qualcomm Europe | - |
GP‑052439 | 70.8.5.3 - New Test Case for MS-Based A-GPS: MO-LR Basic Self Location Request in Idle Mode (Alternative Case) | Qualcomm Europe | - |
GP‑052440 | 70.8.5.4 - New Test Case for MS-Based A-GPS: MO-LR Basic Self Location Request in Dedicated Mode (Alternative Case) | Qualcomm Europe | - |
GP‑052441 | 70.8.6 - New Test Case for MS-Based A-GPS: MO-LR Transfer to 3rd Party | Qualcomm Europe | - |
GP‑052442 | PICS/PIXIT for new MS-Based A-GPS test cases | Qualcomm Europe | - |
GP‑052443 | Modification of description of testsignal I3 in Annex 5 | BenQ Mobile | - |
GP‑052444 | 51.010-1; TC 21.3.X: Change of interferer signal | BenQ Mobile | - |
GP‑052445 | 51.010-1; TC 21.4.X: Change of interferer signal | BenQ Mobile | - |
GP‑052446 | CR 51.010-1 Section – 51.5.3.1.1Mismatch between Conformance Requirements and test procedure | Rohde & Schwarz | - |
GP‑052447 | CR 51.010-1 Section 52.1.2.1.9.3 Specific message content (GSM 1800 / GSM 1900) | Rohde & Schwarz | - |
GP‑052448 | CR 51.010-1 Section – 57.2.1 Incorrect macro in step 5 | Rohde & Schwarz | - |
GP‑052449 | CR 51.010-1 Section 50.4.3.6 Conditional parameter check in Two Phase Access macro. | Rohde & Schwarz | - |
GP‑052450 | CR 51.010-1 Section 50.2.4 DTM Assignment Command missing in EGPRS default messages section. | Rohde & Schwarz | - |
GP‑052451 | CR 51.010-1 Section 42.4.8.4.5 Correction of Expected Sequence | Rohde & Schwarz | - |
GP‑052452 | CR 51.010-1 Section 42.9.2.2.4 Correction of Test Procedure and Expected Sequence | Rohde & Schwarz | - |
GP‑052453 | CR 51.010-1 Section 42.9.2.2.5 Correction of Expected Sequence | Rohde & Schwarz | - |
GP‑052454 | CR 51.010-1 Section 40.4.3.22 New macro Bring MS in the active state (U10) | Rohde & Schwarz | - |
GP‑052455 | 60.1, 60.2a, 60.2b, 60.3a, 60.3b, 60.4, 60.5, 60.6 – add applicability for 850 / 1900. | Aeroflex | - |
GP‑052456 | Applicability of 60.x to add GSM 850 / PCS 1900 | Aeroflex | - |
GP‑052457 | - | - | - |
GP‑052458 | 5.2Deadline for submission of documents | Agenda | - |
GP‑052459 | Correction to the list of logical channels where LB_MS_TXPWR_MAX_CCH is sent | Telecom Italia S.p.A. | - |
GP‑052460 | Correction to the list of logical channels where LB_MS_TXPWR_MAX_CCH is sent | Telecom Italia S.p.A. | - |
GP‑052461 | Correction to MBMS notification for mobile stations in DTM or MAC-DTM state | Telecom Italia S.p.A. | - |
GP‑052462 | Correction to passive mode | Telecom Italia S.p.A. | - |
GP‑052463 | 22.3 corrections to the test procedure | Nokia | - |
GP‑052464 | 22.8 corrections to the test procedure | Nokia | - |
GP‑052465 | test reduction, removal of test cases 13.6, 13.7 and 13.8 | Nokia | - |
GP‑052466 | Part2, test reduction, removal of test cases 13.6, 13.7 and 13.8 | Nokia | - |
GP‑052467 | part2 test reduction, change of applicability for 13.1, 13.3 and 13.4 | Nokia | - |
GP‑052468 | 14.5.1.2 & 14.5.1.3 correction to purpose | Nokia | - |
GP‑052469 | 14.18.3 corrections to the test procedure | Nokia | - |
GP‑052470 | CR 51.010-2 Separate PICS for GPRS EDA and EGPRS EDA required | Rohde & Schwarz | - |
GP‑052471 | CR 51.010-2 PICS for Multiple TBF Release 6 feature missing | Rohde & Schwarz | - |
GP‑052472 | CR 51.010-1 section 47.3.1.3.1 Branch A and B redundant | Rohde & Schwarz | - |
GP‑052473 | CR 51.010-1 section 44.2.10 Incorrect note in Contents of Attach Request message. | Rohde & Schwarz | - |
GP‑052475 | CR 51.010-1 Section 26.9.7 - Correction to erroneous Mobile Allocation | Rohde & Schwarz | - |
GP‑052476 | CR 51.010-1 42.9.2.1.1 Incorrect step reference in comments of step 21 | Rohde & Schwarz | - |
GP‑052477 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052478 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052479 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052480 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052481 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052482 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052483 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052484 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052485 | Inclusion of SACCH and SDCCH | LG Electronics Inc. | - |
GP‑052486 | Provision of MBMS parameters in "GPRS cell options" inband to CS connected DTM capable MS. | NEC | - |
GP‑052487 | Provision of MBMS parameters in "GPRS cell options" inband to CS connected DTM capable MS | NEC | - |
GP‑052488 | Clarification to LINK_QUALITY_MEASUREMENT_MODE interpretation. | NEC | - |
GP‑052489 | Clarification to N3104 counting procedures for EGPRS header type 1 RLC blocks. | NEC | - |
GP‑052490 | Correction to the velocity request encoding | QUALCOMM Europe | - |
GP‑052491 | Fractional Chips definition contradiction | QUALCOMM Europe | - |
GP‑052492 | Correction to MBMS notification for mobile stations in DTM | Telecom Italia S.p.A. | - |
GP‑052493 | Correction to MBMS notification for mobile stations in DTM | Telecom Italia S.p.A. | - |
GP‑052494 | Correction to the MS_ID Request Indication field | Telecom Italia S.p.A. | - |
GP‑052495 | Correction to the MS_ID Request Indication field | Telecom Italia S.p.A. | - |
GP‑052496 | Correction to the conditions triggering MBMS non-DRX mode | Telecom Italia S.p.A. | - |
GP‑052497 | Correction to the conditions triggering MBMS non-DRX mode | Telecom Italia S.p.A. | - |
GP‑052498 | Improventment of cell reselection to UTRAN with unsuitable neighbour cells | T-Mobile | - |
GP‑052499 | Improventment of cell reselection to UTRAN with unsuitable neighbour cells | T-Mobile | - |
GP‑052500 | 13.1 removal of vibration condition | Nokia | - |
GP‑052501 | 13.6 removal of vibration condition | Nokia | - |
GP‑052502 | 13.16.1 removal of vibration condition | Nokia | - |
GP‑052503 | 13.17.1 removal of vibration condition | Nokia | - |
GP‑052504 | Update for latest version of TTCN | MCC272 | - |
GP‑052505 | - | - | - |
GP‑052506 | Correction of approved WI-012 test case 20.22.29. | Rohde & Schwarz | - |
GP‑052507 | Corrections to approved GCF WI-10 P4 test cases 60.1 and 60.3a. | Rohde & Schwarz | - |
GP‑052508 | Corrections to approved IR_G test case 60.3a | Anite | - |
GP‑052509 | Correction to the IR_G test case 60.6 | Anite | - |
GP‑052510 | Summary of regression errors in the wk36 IR_G ATS. | Aeroflex | - |
GP‑052511 | Summary of regression results for wk36 version of IR_G ATS V6.3.0 | Rohde & Schwarz | - |
GP‑052512 | Summary of regression errors in the wk38 IR_G ATS | Anite | - |
GP‑052513 | Summary of regression errors in the wk38 ATS. | Aeroflex | - |
GP‑052514 | Correction to Dynamic Allocation struct in Packet Timeslot Reconfigure | Nokia | - |
GP‑052515 | Correction to Dynamic Allocation struct in Packet Timeslot Reconfigure | Nokia | - |
GP‑052516 | RTP packets | Nokia | - |
GP‑052517 | - | - | - |
GP‑052518 | Section 21.4.3 Editorial Correction To Surplus Statement Added In Recent Update | Qualcomm Europe S.A.R.L. | - |
GP‑052519 | Section 42.4.5.3 Needs To Allow Multiple Packet PSI Status Messages | Qualcomm Europe S.A.R.L. | - |
GP‑052520 | Section 44.2.2.1.7 Invalid Test Requirement Set After The Detach Procedure (IMSI) | Qualcomm Europe S.A.R.L. | - |
GP‑052521 | Section 42.3.3.1.3 Should Only Apply From Rel-6 And Onwards | Qualcomm Europe S.A.R.L. | - |
GP‑052522 | Removal of cell selection requirement at MS switch on | Ericsson | - |
GP‑052523 | 26.1.1 – Use of 3 digit MNC in GSM 700, GSM850 | Anite | - |
GP‑052524 | CR 051.010-1 Section 41.5.1.1.1.4, 47.3.4.1 and 47.3.4.2 | - | - |
GP‑052525 | Deletion of testcases 52.1.2.2.1 and 52.1.2.2.6 | - | - |
GP‑052526 | Deletion of section 52.5.5 “Downlink Transfer / Reestablishment” | - | - |
GP‑052527 | CR 051.010-2-0313 Removal of testcases 52.1.2.2.1, 51.1.2.2.6, 52.5.5.1, 52.5.5.2 and 52.5.5.3 from table B1 (Rel-6) | Nokia | - |
GP‑052528 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message. | Nokia | - |
GP‑052529 | Correction to list reference in the MBMS DOWNLINK ACK/NACK message | Nokia | - |
GP‑052530 | Correction to list reference in the MBMS DOWNLINK ACK/NACK message | Nokia | - |
GP‑052531 | Correction to the rules of reporting neighbouring cells in the MBMS DOWNLINK ACK/NACK message | Nokia | - |
GP‑052532 | Correction to the rules of reporting neighbouring cells in the MBMS DOWNLINK ACK/NACK message | Nokia | - |
GP‑052533 | Inclusion of (BCCH) ARFCN to the PS Handover Radio Resources IE | - | - |
GP‑052534 | Inclusion of (BCCH) ARFCN to the PS Handover Radio Resources IE | - | - |
GP‑052535 | - | - | - |
GP‑052536 | - | - | - |
GP‑052537 | - | - | - |
GP‑052538 | - | - | - |
GP‑052539 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052540 | Clarifications to GAN Stage 2 | Ericsson | - |
GP‑052541 | Removal of FFSes related to NAS container | Ericsson | - |
GP‑052542 | Security clean-up | Ericsson | - |
GP‑052543 | Transferring of UE RAC and START PS from the MS to the BSC | Ericsson | - |
GP‑052544 | Various corrections to TS 43.129 | Ericsson | - |
GP‑052545 | - | - | - |
GP‑052546 | - | - | - |
GP‑052547 | - | - | - |
GP‑052548 | - | - | - |
GP‑052550 | - | - | - |
GP‑052551 | Correction to SNS-SIZE procedure | Ericsson | - |
GP‑052552 | Correction to SNS-SIZE procedure | Ericsson | - |
GP‑052553 | Correction to SNS-SIZE procedure | Ericsson | - |
GP‑052554 | Correction to SNS-SIZE procedure | Ericsson | - |
GP‑052555 | Signalling Transport for MSC in Pool | Ericsson | - |
GP‑052556 | Signalling Transport for MSC in Pool | Ericsson | - |
GP‑052557 | Signalling Transport for MSC in Pool | Ericsson | - |
GP‑052558 | Signalling Transport for MSC in Pool | Ericsson | - |
GP‑052559 | Signalling Transport for MSC in Pool | Ericsson | - |
GP‑052560 | Signalling Transport for MSC in Pool | Ericsson | - |
GP‑052561 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052562 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052563 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052564 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052565 | Clarifications to GAN Stage 3 | Ericsson | - |
GP‑052566 | Fast RACH – Removal of Random Spreading at initiation of Immediate Assignment procedure | Ericsson | - |
GP‑052567 | Early TBF Allocation | Ericsson | - |
GP‑052568 | Early TBF Allocation | Ericsson | - |
GP‑052569 | Early TBF Allocation | Ericsson | - |
GP‑052570 | Correction of length for LAI in VGCS Ciphering Parameters | Ericsson | - |
GP‑052571 | Repeated SACCH description | Siemens | - |
GP‑052572 | Measurement Period Length Indicator for repeated SACCH | Siemens | - |
GP‑052573 | Measurement Period Length Indicator for repeated SACCH | Siemens | - |
GP‑052574 | - | - | - |
GP‑052575 | - | Nokia | - |
GP‑052576 | Repeated SACCH description | Nokia | - |
GP‑052577 | Repeated SACCH signalling | Nokia | - |
GP‑052578 | Repeated SACCH | Nokia | - |
GP‑052579 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens | - |
GP‑052580 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens, Nokia | - |
GP‑052581 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens | - |
GP‑052582 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens, Nokia | - |
GP‑052583 | Correction to channel type IE | Siemens | - |
GP‑052584 | New talker information for pre-empted talker | Siemens | - |
GP‑052585 | SMS to group call | Siemens | - |
GP‑052586 | SMS to group call | Siemens | - |
GP‑052587 | - | - | - |
GP‑052588 | Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container | - | - |
GP‑052589 | Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container | - | - |
GP‑052590 | - | - | - |
GP‑052591 | - | - | - |
GP‑052592 | Introduction of the DTM HANDOVER | Nokia | - |
GP‑052593 | Corrections to Source RNC to Target RNC container | - | - |
GP‑052594 | - | - | - |
GP‑052595 | Introduction of Critical Priority for PS Handover | Siemens | - |
GP‑052596 | Critical Priority for PS Handover | Siemens | - |
GP‑052597 | Critical Priority for PS Handover | Siemens | - |
GP‑052598 | - | - | - |
GP‑052599 | - | - | - |
GP‑052600 | Introduction of PS handover in TS 45.010 | Alcatel | - |
GP‑052601 | Correction to reference to TS 45.010 for PS handover | Alcatel | - |
GP‑052602 | Correction to reference to TS 45.010 for PS handover | Alcatel | - |
GP‑052603 | Handling of Reject frame in case of Repeated Downlink FACCH | Nortel Networks | - |
GP‑052604 | Handling of a reject frame in case of Repeated Downlink FACCH and miscellaneous corrections | Nortel Networks | - |
GP‑052605 | Repeated SACCH performance requirements | Nokia | - |
GP‑052606 | Repeated SACCH performance requirements | Nokia | - |
GP‑052610 | - | Nokia | - |
GP‑052611 | - | Nokia | - |
GP‑052612 | - | - | - |
GP‑052613 | SACCH frames repetition signalling using stealing flags | Motorola | - |
GP‑052614 | EPC codewords on 10 bits | Motorola | - |
GP‑052615 | RLT Counter management using serial SACCH | Motorola | - |
GP‑052616 | RLT Counter management using serial SACCH | Motorola | - |
GP‑052617 | RSCP suitability criterion parameters handling | Infineon Technologies | - |
GP‑052618 | Introducing UE antenna performance requirements into the 3GPP specifications | TeliaSonera | - |
GP‑052619 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052620 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052621 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052622 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052623 | Accuracy requirements of MS MEAN_BEP estimation: removal of brackets | BenQ Mobile, Infineon Technologies AG | - |
GP‑052624 | - | - | - |
GP‑052625 | 51.010-1 section 42.4.5.4 Step 18 and 33: Comment deleted. | Rohde & Schwarz | - |
GP‑052626 | 51.010-1 section 42.4.5.9 Step 22 and 37: Comment deleted. | Rohde & Schwarz | - |
GP‑052627 | Re-assembly of upper layer PDUs in RLC non-persistent mode | Siemens | - |
GP‑052628 | Re-assembly of upper layer PDUs in RLC non-persistent mode | Siemens | - |
GP‑052629 | No activation of ciphering during UTRAN to GERAN A/Gb mode handover | Siemens | - |
GP‑052630 | No activation of ciphering during UTRAN to GERAN A/Gb mode handover | Siemens | - |
GP‑052631 | No activation of ciphering during UTRAN to GERAN A/Gb mode handover | Siemens | - |
GP‑052632 | - | Siemens | - |
GP‑052633 | Early TBF Establishment | Siemens | - |
GP‑052634 | - | Siemens | - |
GP‑052635 | Priority change for SAPI=3 transmission during Repeated SACCH | Siemens | - |
GP‑052636 | Sending DTM Information after Handover | Siemens | - |
GP‑052637 | LS on Ciphering and PS Handover | CT1 | - |
GP‑052638 | Reply LS on Inter-band mobility and Potential inter-RAT inter-working problem caused by overlapping UTRAN operating bands | GERAN2 | - |
GP‑052639 | Liaison Statement on Permeable-Layer Receiver and Upper Layers | GERAN2 | - |
GP‑052640 | Reply LS on Security key set change on PS handover | RAN2 | - |
GP‑052641 | Inter-band mobility and potential inter-RAT inter-working problem caused by overlapping UTRAN operating bands | RAN WG2 | - |
GP‑052642 | LS on Requirements for using Cell Identity and Cell Type for charging and/or other services | SA 2 | - |
GP‑052643 | Reply LS on “Use of "pub.3gppnetwork.org" domain” from GSMA | SA2 | - |
GP‑052644 | Reply Liaison Statement on SA4 FEC Simulation Assumptions for GERAN and Permeable-Layer Receiver | SA4 | - |
GP‑052645 | - | - | - |
GP‑052646 | - | PT SE7 adhoc GSM on board | - |
GP‑052647 | - | Nokia | - |
GP‑052648 | AMR for VGCS | Nortel | - |
GP‑052649 | Corrections to GMM test case 44.2.8.1.2 | Motorola | - |
GP‑052650 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052652 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052653 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052654 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052656 | - | - | - |
GP‑052657 | - | - | - |
GP‑052658 | - | - | - |
GP‑052659 | Deletion of TLLI contexts in BVC-RESET Procedure | FLEXTRONICS SOFTWARE SYSTEMS | - |
GP‑052660 | Deletion of TLLI contexts in BVC-RESET Procedure | FLEXTRONICS SOFTWARE SYSTEMS | - |
GP‑052661 | Deletion of TLLI contexts in BVC-RESET Procedure | FLEXTRONICS SOFTWARE SYSTEMS | - |
GP‑052662 | Deletion of TLLI contexts in BVC-RESET Procedure | FLEXTRONICS SOFTWARE SYSTEMS | - |
GP‑052663 | MS support of EPC | Infineon Technologies | - |
GP‑052664 | MS support of EPC | Infineon Technologies | - |
GP‑052665 | MS support of EPC | Infineon Technologies | - |
GP‑052666 | Draft CR 43.055: SGSNR during DTM (Rel-7) | Infineon | - |
GP‑052667 | Performance requirements for E-TCH/F32.0 | Ericsson, Nokia, Siemens, BenQ, Philips | - |
GP‑052668 | Performance requirements for E-TCH/F32.0 | Ericsson, Nokia, Siemens, BenQ, Philips | - |
GP‑052669 | Performance requirements for E-TCH/F32.0 | Ericsson, Nokia, Siemens, BenQ, Philips | - |
GP‑052670 | Performance requirements for E-TCH/F32.0 | Ericsson, Nokia, Siemens, BenQ, Philips | - |
GP‑052671 | Performance requirements for E-TCH/F32.0 | Ericsson, Nokia, Siemens, BenQ, Philips | - |
GP‑052672 | Performance requirements for FLO | Philips | - |
GP‑052673 | Performance requirements for FLO | Philips | - |
GP‑052675 | - | - | - |
GP‑052676 | Correction to the reference for the MBMS Session Identity IE coding | Telecom Italia S.p.A. | - |
GP‑052677 | Correction to the reference for the MBMS Session Identity IE coding | Telecom Italia S.p.A. | - |
GP‑052678 | Correction of Size and Configuration Procedures for an IP Sub-network | Nortel | - |
GP‑052679 | Extension of “Service UTRAN CCO” meaning to cover PS Handover | Siemens | - |
GP‑052680 | Extension of “Service UTRAN CCO” meaning to cover PS Handover | Siemens | - |
GP‑052681 | Miscellaneous corrections and clean-up | Nortel Networks | - |
GP‑052682 | Transparent UMTS specific information in Classmark Change (Rel-5) | Nortel | - |
GP‑052683 | Transparent UMTS specific information in Classmark Change (Rel-6) | Nortel | - |
GP‑052684 | Transparent UMTS specific information in Classmark Change (Rel-7) | Nortel | - |
GP‑052685 | Transparent UMTS specific information in Classmark Change (Rel-4) | Nortel | - |
GP‑052686 | Introduction of the MBMS Session Repetition Number | Telecom Italia S.p.A. | - |
GP‑052687 | Introduction of the MBMS Session Repetition Number | Telecom Italia S.p.A. | - |
GP‑052688 | Introduction of the MBMS Session Repetition Number | Telecom Italia S.p.A. | - |
GP‑052689 | Introduction of the MBMS Session Repetition Number | Telecom Italia S.p.A. | - |
GP‑052690 | Introduction of the MBMS Session Repetition Number | Telecom Italia S.p.A. | - |
GP‑052691 | Condition for sending DTM INFORMATION message | Nortel Networks | - |
GP‑052692 | Condition for sending DTM INFORMATION message | Nortel Networks | - |
GP‑052693 | Introduction of fast reception resumption for MBMS | Telecom Italia S.p.A. | - |
GP‑052694 | Introduction of fast reception resumption for MBMS | Telecom Italia S.p.A. | - |
GP‑052695 | Handling of START PS and UE RAC during PS handover | Ericsson | - |
GP‑052696 | Correction of reference to NAS Container for PS HO IE | Ericsson | - |
GP‑052697 | Correction of reference to NAS Container for PS HO IE | Ericsson | - |
GP‑052698 | Additional pre-configured IP endpoint in BSS | Siemens | - |
GP‑052699 | Additional pre-configured IP endpoint in BSS | Siemens | - |
GP‑052700 | LB_MS_TXPWR_MAX_CCH to PSI13 and PSI14 on PACCH | Nokia | - |
GP‑052701 | LB_MS_TXPWR_MAX_CCH to PSI13 and PSI14 on PACCH | Nokia | - |
GP‑052702 | Permission to access the network during DL TBF | Infineon | - |
GP‑052703 | Introduction of the MBMS Session Repetition Number | Telecom Italia S.p.A. | - |
GP‑052704 | Handling of START PS and UE RAC during PS handover | Ericsson | - |
GP‑052705 | Less Restrictive PS HO Triggers | Ericsson | - |
GP‑052706 | Less Restrictive PS HO Triggers | Ericsson | - |
GP‑052707 | Correction of reference to 2G-3G handover IE | Nortel | - |
GP‑052708 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | Nokia | - |
GP‑052709 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | Nokia | - |
GP‑052710 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | Nokia | - |
GP‑052711 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | Nokia | - |
GP‑052712 | - | - | - |
GP‑052713 | CR 51.010-1-3174 cl. 13.4 - Change of measurement window to eliminate test system variations | 7Layers UK | - |
GP‑052714 | CR 51.010-1-3175 cl. 13.16.3 - Change of measurement window to eliminate test system variations | 7Layers UK | - |
GP‑052715 | CR 51.010-1-3176 cl. 13.17.4 - Change of measurement window to eliminate test system variations | 7Layers UK | - |
GP‑052716 | LS on Alignment of information element in BSS PFC procedure messages | SA2 | - |
GP‑052717 | - | - | - |
GP‑052718 | - | - | - |
GP‑052719 | Clarification on the transmission of SI1 | Siemens | - |
GP‑052720 | - | - | - |
GP‑052721 | Draft report of the GSM on Board Aircrafts Joint Meeting (ETSI MSG, ETSI ERM TG25, 3GPP GERAN WG1, 3GPP RAN WG4, ECC SE7) (Sophia Antipolis, France 9th September 2005) | ETSI MSG Technical Officer | - |
GP‑052722 | - | - | - |
GP‑052723 | - | - | - |
GP‑052724 | - | - | - |
GP‑052725 | - | - | - |
GP‑052726 | SACCH repetition signalling using stealing flags of SACCH | Siemens | - |
GP‑052727 | Extended measurement period for Repeated SACCH | Siemens | - |
GP‑052728 | Extended measurement period for repeated SACCH | Siemens | - |
GP‑052729 | Inter-working between EPC and Repeated SACCH | Siemens | - |
GP‑052730 | Inter-working between EPC and Repeated SACCH | Siemens | - |
GP‑052731 | - | - | - |
GP‑052732 | - | - | - |
GP‑052733 | Reply to LS on time to MBMS data transfer coding | CT4 | - |
GP‑052734 | Reply to LS on BSSGP cause in FORWARD RELOCATION REQUEST message | CT4 | - |
GP‑052735 | Reply LS on Alignment of information element in BSS PFC procedure messages | CT1 | - |
GP‑052736 | Fixed rate AMR option for EVGCS calls. | TSG-CT1 | - |
GP‑052737 | Liaison Statement on Permeable-Layer Receiver and Upper Layers | CT1 | - |
GP‑052738 | Reply LS on NAS expectations on message delivery during PS Handover | CT1 | - |
GP‑052739 | Performance criteria for RXQUAL under faded conditions | TSG GERAN WG3 | - |
GP‑052740 | - | - | - |
GP‑052741 | Title | Nokia | - |
GP‑052742 | - | Nokia | - |
GP‑052743 | - | - | - |
GP‑052744 | Re: Performance criteria for RXQUAL under faded conditions | TSG GERAN WG1 | - |
GP‑052745 | Draft: Reply LS on Addressing concerns raised at the GSMOB coordination meeting (GP-02646 /SE7(05)162 rev 1) | GERAN1 | - |
GP‑052746 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052747 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052748 | Accuracy requirements of MS MEAN_BEP estimation: removal of brackets | BenQ Mobile, Infineon Technologies AG | - |
GP‑052749 | Introduction of PS handover in TS 45.010 | Alcatel | - |
GP‑052750 | RSCP suitability criterion parameters handling | Infineon Technologies | - |
GP‑052751 | Reply LS on Alignment of information element in BSS PFC procedure messages | GERAN2 | - |
GP‑052752 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052753 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052754 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052755 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052756 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052757 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052758 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052759 | Corrections to UTRAN TDD cell information for 1.28Mcps TDD | CATT, TD Tech | - |
GP‑052760 | No activation of ciphering during UTRAN to GERAN A/Gb mode handover | Siemens | - |
GP‑052761 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens | - |
GP‑052762 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens | - |
GP‑052763 | - | - | - |
GP‑052764 | - | - | - |
GP‑052765 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens, Nokia | - |
GP‑052766 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens, Nokia | - |
GP‑052767 | Provision of MBMS parameters in "GPRS cell options" inband to CS connected DTM capable MS. | NEC | - |
GP‑052768 | Provision of MBMS parameters in "GPRS cell options" inband to CS connected DTM capable MS | NEC | - |
GP‑052769 | Correction to the rules of reporting neighbouring cells in the MBMS DOWNLINK ACK/NACK message | Nokia | - |
GP‑052770 | Correction to the rules of reporting neighbouring cells in the MBMS DOWNLINK ACK/NACK message | Nokia | - |
GP‑052771 | 14.1.3, 14.1.4, 14.4.3 – Tests reduction (tests deleted) | Aeroflex | - |
GP‑052775 | 42.4.5.4 & 42.4.5.9 - Ready timer is deactivated | Anite | - |
GP‑052776 | 14.5.1.4 – Corrections to test procedure | Aeroflex | - |
GP‑052777 | CR 051.010-1 Section 41.3.1.2TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode | Setcom | - |
GP‑052778 | CR 051.010-1 Section 51.3.1.2TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode | Setcom | - |
GP‑052779 | 51010-1:Changes in the expected sequence of the testcase 41.3.3 | SASKEN | - |
GP‑052780 | 51010-1:Changes in the expected sequence of the testcase 51.3.3 | SASKEN | - |
GP‑052781 | 41.3.6.8 – All Packet System Information for Cell B is replaced by Packet Downlink Dummy Control Block on PBCCH. The data trigger at Step1 is reduced to 1200 octets | Anite | - |
GP‑052782 | 51.3.6.8 - All Packet System Information for Cell B is replaced by Packet Downlink Dummy Control Block on PBCCH. The data trigger at Step1 is reduced to 1200 octets | Anite | - |
GP‑052783 | CR 51.010-1 Section 41.3.6.9 missing steps to prevent retransmission of old LLC PDU and to handle inactive period | Rohde & Schwarz | - |
GP‑052784 | CR 51.010-1 Section 51.3.6.9 missing steps to prevent retransmission of old LLC PDU and to handle inactive period | Rohde & Schwarz | - |
GP‑052785 | CR 51.010-1 Section – 41.5.1.1.2.1Ambiguous note in step 4 removed | Rohde & Schwarz | - |
GP‑052786 | Correction to TC42.3.3.2.1 | NEC | - |
GP‑052787 | Changes for Extended Dynamic Allocation / Shifted USF test cases 42.9.3.1.1-3 | Ericsson | - |
GP‑052788 | 42.9.2.1.1.1, 42.9.2.1.2.1 Changes to Conformance Statement. | Ericsson | - |
GP‑052789 | 51010-1:Addition of an USF after the uplink assignment in step 5, of the testcase 52.1.2.1.10.1 | SASKEN | - |
GP‑052790 | 53.1.1.24 – Bad implementation of previous CR | Wavecom, Anite | - |
GP‑052791 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052792 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052793 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052794 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052795 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052796 | Clarifications to GAN Stage 2 | Ericsson | - |
GP‑052797 | Clarifications to GAN Stage 3 | Ericsson | - |
GP‑052798 | RTP packets | Nokia | - |
GP‑052799 | Corrections to Source RNC to Target RNC container | - | - |
GP‑052800 | Various corrections to TS 43.129 | Ericsson | - |
GP‑052801 | LS on Inter-RAT PS Handover Improvements | GERAN | - |
GP‑052802 | Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container | - | - |
GP‑052803 | Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container | - | - |
GP‑052804 | DTM stage 2 alignments with stage 3.. | NEC | - |
GP‑052805 | Reply LS on Security key set change on PS handover | GERAN | - |
GP‑052806 | Introduction of the definition of UTRAN to GAN handover | Vodafone | - |
GP‑052807 | New talker information for pre-empted talker | Siemens | - |
GP‑052808 | Repeated SACCH description | Nokia | - |
GP‑052809 | Repeated SACCH description | Nokia | - |
GP‑052810 | Repeated SACCH signalling | Nokia | - |
GP‑052811 | Introduction of the DTM HANDOVER | Nokia | - |
GP‑052812 | Performance requirements for E-TCH/F32.0 | Ericsson | - |
GP‑052813 | Performance requirements for E-TCH/F32.0 | Ericsson | - |
GP‑052814 | Performance requirements for E-TCH/F32.0 | Ericsson | - |
GP‑052815 | Performance requirements for E-TCH/F32.0 | Ericsson | - |
GP‑052816 | Performance requirements for E-TCH/F32.0 | Ericsson | - |
GP‑052817 | Clarification to usage of uplink power control parameters provided on PACCH. | NEC | - |
GP‑052818 | SGSNR during DTM (Rel-7) | Infineon | - |
GP‑052819 | DRAFT CR 24.008 Indication of support for Serial SACCH Repetition | Ericsson | - |
GP‑052820 | DRAFT CR 24.008 Indication of support for Serial SACCH Repetition | Ericsson | - |
GP‑052821 | Update of the Applicability for some EGPRS TC | Wavecom | - |
GP‑052822 | 51.010-1 section 42.4.5.3 Step B18 and B35: Incorrect comment deleted | Rohde & Schwarz | - |
GP‑052823 | 51.010-1 section 42.4.5.5 Step 22: Incorrect comment deleted. | Rohde & Schwarz | - |
GP‑052824 | 51.010-1 section 42.4.5.7 Step 13: Incorrect comment deleted. | Rohde & Schwarz | - |
GP‑052825 | 51.010-1 section 42.4.5.4 Step 18 and 33: Comment deleted. | Rohde & Schwarz | - |
GP‑052826 | 51.010-1 section 42.4.5.9 Step 22 and 37: Comment deleted. | Rohde & Schwarz | - |
GP‑052827 | CR 51.010-1 Section 42.4.8.4.5 Correction of Expected Sequence | Rohde & Schwarz | - |
GP‑052828 | 51010-1:Changes in the expected sequence of the testcase 44.2.1.1.5.3. | SASKEN | - |
GP‑052829 | CR 51.010-1 section 44.2.10 Incorrect note in Contents of Attach Request message. | Rohde & Schwarz | - |
GP‑052830 | CR 051.010-1 45.2.4.3 Network initiated PDP context activation request for an already activated PDP context (on the MS side) | Setcom | - |
GP‑052831 | 51010-1:Changes in the expected sequence of the testcase 46.1.2.2.3.1. | SASKEN | - |
GP‑052832 | CR 51.010-1 section 47.3.1.3.1 Branch A and B redundant | Rohde & Schwarz | - |
GP‑052833 | CR 051.010-1 Section 51.2.5.3Packet access rejection / Interpretation of Extended RA i / Correct value of Extended RA i | Setcom | - |
GP‑052834 | CR 51.010-1 Section 52.1.2.1.9.3 Specific message content (GSM 1800 / GSM 1900) | Rohde & Schwarz | - |
GP‑052835 | Applicability of 14.1.3, 14.1.4, 14.4.3 – Tests reduction (tests deleted) | Aeroflex | - |
GP‑052836 | 70.9.2.1, 70.9.2.2, 70.9.3.1, 70.9.3.2 - Addition of PICS “Support of privacy option” | Anite | - |
GP‑052837 | - | - | - |
GP‑052839 | - | - | - |
GP‑052840 | Introduction of new MS-Based A-GPS test cases | Qualcomm Europe | - |
GP‑052841 | Repeated SACCH performance requirements | Nokia | - |
GP‑052842 | Clarification to LINK_QUALITY_MEASUREMENT_MODE interpretation. | NEC | - |
GP‑052843 | Provision of MBMS parameters in “GPRS cell options” inband to CS connected DTM capable MS. | NEC | - |
GP‑052844 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052845 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052846 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052847 | MBMS transfer mode | Ericsson, Siemens | - |
GP‑052848 | Introduction of the Inter RAT Handover to GAN definition | Vodafone | - |
GP‑052849 | Correction on the transmission of SI1 | Siemens | - |
GP‑052850 | LS on Revised UARFCN scheme to solve inter-band mobility and potential inter-RAT inter-working problem caused by overlapping UTRAN operating bands | RAN4 | - |
GP‑052851 | LS on WB-AMR Work Plan | GCF CAG | - |
GP‑052852 | 42.4.4.1 – Clarification of Packet Measurement Report handling during initial conditions | Ericsson | - |
GP‑052853 | CR 051.010-1 53.1.1.25 Acknowledged Mode/ Uplink TBF/ TBF Reallocation/Window Size | Setcom | - |
GP‑052854 | - | - | - |
GP‑052855 | GSM 710 | TSG GERAN WG3 | - |
GP‑052856 | 5.2Deadline for submission of documents | Agenda | - |
GP‑052857 | Part2, test reduction, change of applicability for test cases 13.6, 13.7 and 13.8 | Nokia | - |
GP‑052858 | 20.22.23 Removal of the TC | Wavecom | - |
GP‑052859 | Removal of 20.22.23 | Wavecom | - |
GP‑052860 | GERAN WG3 action points at end of meeting #27 | TSG GERAN WG3 Secretary | - |
GP‑052861 | WB AMRWork Plan Revision 3.3 | TIM, RIM, BenQ, Sony Ericsson, Ericsson, Qualcomm, Aeroflex | - |
GP‑052862 | LS on Work Plan for L1 test reduction | TSG GERAN WG3 | - |
GP‑052863 | - | - | - |
GP‑052864 | GP-052329Source GERAN WG3 Chairman: Draft Agenda for TSG GERAN WG3 during TSG GERAN no. 27 in Atlanta | ource GERAN WG3 ChairmanTitle: Draft Agenda for TSG GERAN WG3 during TSG GERAN no. 27 in Atlanta | - |
GP‑052865 | - | - | - |
GP‑052866 | - | - | - |
GP‑052867 | Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container | - | - |
GP‑052868 | Allowing Extensions to PS Handover target-BSS to source-BSS Transparent Container | - | - |
GP‑052869 | Clarification to LINK_QUALITY_MEASUREMENT_MODE interpretation. | NEC | - |
GP‑052870 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052872 | - | - | - |
GP‑052873 | - | - | - |
GP‑052874 | - | - | - |
GP‑052875 | - | - | - |
GP‑052876 | Response LS on PSI/SI Information Transfer during inter-RAT PS Handover | TSG RAN WG3 | - |
GP‑052877 | Repeated SACCH description | Nokia | - |
GP‑052878 | MBMS Transfer Mode | Ericsson, Siemens | - |
GP‑052879 | Repeated SACCH description | Nokia | - |
GP‑052891 | Repeated SACCH | Nokia | - |
GP‑052892 | DRAFT CR 24.008 Indication of support for Repeated SACCH | Ericsson | - |
GP‑052893 | DRAFT CR 24.008 Indication of support for Repeated SACCH | Ericsson | - |
GP‑052894 | [DRAFT] Addition of Repeated SACCH capability indicator | 3GPP TSG GERAN | - |
GP‑052895 | Fast RACH – Removal of Random Spreading at initiation of Immediate Assignment procedure | Ericsson | - |
GP‑052896 | Inclusion of SACCH and SDCCH | LG Electronics Inc. | - |
GP‑052897 | Clarification to N3104 counting procedures for EGPRS header type 1 RLC blocks. | NEC | - |
GP‑052898 | Early TBF Establishment | Siemens | - |
GP‑052899 | AMR for VGCS | Nortel | - |
GP‑052901 | - | - | - |
GP‑052902 | Means for selecting between different position determination approaches | Motorola | - |
GP‑052904 | LS on Inter-RAT PS Handover Improvements | GERAN | - |
GP‑052905 | [DRAFT] Addition of Repeated SACCH capability indicator | 3GPP TSG GERAN | - |
GP‑052906 | Provision of MBMS parameters in "GPRS cell options" inband to CS connected DTM capable MS | NEC | - |
GP‑052907 | Provision of MBMS parameters in "GPRS cell options" inband to CS connected DTM capable MS. | NEC | - |
GP‑052908 | Network behaviour on T3107 expiry when sending encapsulated DTM ASSIGNMENT command | Siemens, Nokia | - |
GP‑052909 | Clarifications to GAN Stage 3 | Ericsson | - |
GP‑052910 | RTP packets | Nokia | - |
GP‑052911 | - | - | - |
GP‑052912 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052913 | Accuracy requirements of MS MEAN_BEP estimation: removal of brackets | BenQ Mobile, Infineon Technologies AG | - |
GP‑052914 | Draft: Reply LS on Addressing concerns raised at the GSMOB coordination meeting (GP-02646 /SE7(05)162 rev 1) | GERAN1 | - |
GP‑052915 | Report back from ECC meeting 12, 24 to 28 October 2005, Cascais | ETSI Radio Competence Centre | - |
GP‑052916 | Accuracy requirements of MS MEAN_BEP estimation | BenQ Mobile, Infineon Technologies AG | - |
GP‑052917 | Accuracy requirements of MS MEAN_BEP estimation: removal of brackets | BenQ Mobile, Infineon Technologies AG | - |
GP‑052918 | - | - | - |
GP‑052919 | Draft Report of TSG GERAN WG1 during TSG GERAN #27, version 0.0.1 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑052921 | Introduction of the Inter RAT Handover to GAN definition | Vodafone | - |
GP‑052922 | Introduction of the definition of UTRAN to GAN handover | Vodafone | - |
GP‑052923 | SMS-PP transmission times in bad radio conditions with AMR signalling enhancements | Nortel Networks | - |
GP‑052924 | [DRAFT] SMS-PP transmission times in bad radio conditions with AMR signalling enhancements | GERAN | - |
GP‑052925 | - | - | - |
GP‑052926 | - | - | - |
page generated from database: 2024-07-20 12:15:34