3GPP TDocs (written contributions) at meeting
Meeting: R4-70 - 2014-02-10 to 2014-02-14, Prague
meeting id: R4-70 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑140001 | Meeting Agenda | WG Chairman | imported from 3GU |
R4‑140002 | RAN4-69 Meeting report | ETSI Secretariat | imported from 3GU |
R4‑140003 | RAN4-69 UE RF Ad-hoc meeting report | ETSI Secretariat | imported from 3GU |
R4‑140004 | R4-69AH-0010: TP for TR 36.853: 3DLs CA_B1_B5_B7 | LG Electronics, LG Uplus | imported from 3GU |
R4‑140005 | R4-69AH-0026: Non-contiguous intra-band 2UL intermodulation products | Qualcomm Incorporated | imported from 3GU |
R4‑140006 | R4-69AH-0027: Class A4: 2UL inter-band CA in Band 3+19 | NTT DOCOMO, INC. | imported from 3GU |
R4‑140007 | R4-69AH-0036: Text proposal for TR 36.860: the additional requirements for CA_1A-7A with 2ULs | ZTE | imported from 3GU |
R4‑140008 | R4-69AH-0042: TR 36.860 v0.5.0 Dual uplink inter-band CA (2014-01) | Huawei | imported from 3GU |
R4‑140009 | R4-69AH-0044: TP for TR 36.860 v0.5.0: Update of harmonic and IMD tables | Huawei | imported from 3GU |
R4‑140010 | R4-69AH-0045: TP for TR 36.860 v0.5.0: Update of Dual unlink inter-band CA class A1 operating bands | Huawei | imported from 3GU |
R4‑140011 | R4-69AH-0047: TP for TR 36.860 v0.5.0: CA_1A-19A Harmonics and Intermodulation Analysis | Huawei | imported from 3GU |
R4‑140012 | R4-69AH-0048: TP for TR 36.860 v0.5.0: CA_7A-28A Harmonics and Intermodulation Analysis | Huawei | imported from 3GU |
R4‑140013 | R4-69AH-0061: CA_2A-4A new bandwidth combination set | Nokia Corporation | imported from 3GU |
R4‑140014 | R4-69AH-0062: TR36.833-4 v0.2.1 | Nokia Corporation | imported from 3GU |
R4‑140015 | R4-69AH-0063: Non-contiguous intraband CA MOP tolerance | Nokia Corporation | imported from 3GU |
R4‑140016 | R4-69AH-0071: Specification structure for RF RX requirements for 3DL CA FDD | Ericsson | imported from 3GU |
R4‑140017 | R4-69AH-0075: Proposal for Tx and Rx relaxations for 3DL CA_3-7-20 | Vodafone | imported from 3GU |
R4‑140018 | R4-69AH-0077: TP to 36.851 on 1+20 Harmonic and IMD analysis (CA_1-3-20 leading and CA_1-7-20) | Vodafone | imported from 3GU |
R4‑140019 | R4-69AH-0088: 2 UL Interband CA PCMAX tolerance | Nokia Corporation, Interdigital | imported from 3GU |
R4‑140020 | R4-69AH-0089: TP for TR 36.860: General TX requirements for 2ULs inter-band CA | LG Electronics | imported from 3GU |
R4‑140021 | R4-69AH-0090: TP for TR 36.860 Spurious emissions for uplink inter-band CA | Ericsson | imported from 3GU |
R4‑140022 | R4-69AH-0091: Way forward on REFSENS for 2UL CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140023 | R4-69AH-0093: TP for TR 36.860: DeltaTIB and deltaRIB for CA_B3_B7 and CA_B3_B20 | TeliaSonera AB | imported from 3GU |
R4‑140024 | R4-69AH-0094: TP for TR 36.860: IMD frequency analysis for CA_5A-7A | Nokia Corporation | imported from 3GU |
R4‑140025 | R4-69AH-0097: TP for TR 36.833-5-41: nominal channel spacing for Class D | Ericsson | imported from 3GU |
R4‑140026 | R4-69AH-0099: TP for 36.853: test configuration and RF RX requirements for 3DL CA FDD | Ericsson | imported from 3GU |
R4‑140027 | R4-69AH-0100: TP to 36.851 on 7+8 Harmonic and IMD analysis (CA_7-8-20) | Vodafone | imported from 3GU |
R4‑140028 | R4-69AH-0101: TP for TR 36.853: For LTE_CA_B3_B7_B20 | TeliaSonera AB | imported from 3GU |
R4‑140029 | R4-69AH-0102: TP for TR 36.860 v0.5.0: UE receiver requirements for 2UL inter-band CA Class A1 | Huawei | imported from 3GU |
R4‑140030 | R4-69AH-0104: TP for TR 36.833-5-41: nominal guard band for Class D | Ericsson | imported from 3GU |
R4‑140031 | Text proposals for coexistence simulation study to AAS BS WI TR 37.cde | ZTE, Tejet | imported from 3GU |
R4‑140032 | Coexistence study summaries on AAS cell splitting applications | ZTE, Tejet | imported from 3GU |
R4‑140033 | Draft CR to TS 25.172 on introduction BDS to A-GANSS of FDD mode of UTRA | ZTE, CATR, CATT, Huawei, Tejet | imported from 3GU |
R4‑140034 | Draft CR to TS 36.171 on introduction BDS to A-GNSS of E-UTRA | ZTE, CATR, CATT, Huawei, Tejet | imported from 3GU |
R4‑140035 | Text Proposals for TS 25.173 on introduction BDS to A-GANSS of TDD mode of UTRA | ZTE, Tejet | imported from 3GU |
R4‑140036 | Initial considerations on performance test for eDL-MIMO in Rel-12 | Samsung | imported from 3GU |
R4‑140037 | Simulation results for TDD CSI test of TM10 | Samsung | imported from 3GU |
R4‑140038 | Simulation results for TM9 SNR test | Samsung | imported from 3GU |
R4‑140039 | Some open issues to support BeiDou navigation satellite system | ZTE, Tejet | imported from 3GU |
R4‑140040 | BDS acquisition detection performance in Coarse-time- assistance | ZTE, Tejet | imported from 3GU |
R4‑140041 | Consideration on small cell 256QAM RF requirements | ZTE, Tejet | imported from 3GU |
R4‑140042 | Clarification on some definitions in TS37.104 | ZTE, Tejet | imported from 3GU |
R4‑140043 | Clarification on some definitions in TS37.104 | ZTE, Tejet | imported from 3GU |
R4‑140044 | Clarification on some definitions in TS37.141 | ZTE, Tejet | imported from 3GU |
R4‑140045 | Clarification on some definitions in TS37.141 | ZTE, Tejet | imported from 3GU |
R4‑140046 | Introduction of Multi-band operation in TS25.142 | ZTE, Tejet | imported from 3GU |
R4‑140047 | Introduction of differential accuracy of Primary CCPCH power test in TS37.141_R10 | ZTE, Tejet | imported from 3GU |
R4‑140048 | Introduction of differential accuracy of Primary CCPCH power test in TS37.141_R11 | ZTE, Tejet | imported from 3GU |
R4‑140049 | Introduction of differential accuracy of Primary CCPCH power test in TS37.141_R12 | ZTE, Tejet | imported from 3GU |
R4‑140050 | Correction on munufacturer's declaration in TS37.141_R11 | ZTE, Tejet | imported from 3GU |
R4‑140051 | Correction on manufacturer's declaration in TS37.141 | ZTE,Tejet | imported from 3GU |
R4‑140052 | Overview of Near-field to Far-field transformation | ZTE, Tejet | imported from 3GU |
R4‑140053 | TR 36.833-1-39 V0.3.0 LTE Advanced intra-band contiguous Carrier Aggregation for Band 39 | CMCC | imported from 3GU |
R4‑140054 | TP for UE transmit modulation quality for non-contiguous intra-band CA | Rohde & Schwarz | imported from 3GU |
R4‑140055 | Impact of Low Cost MTC UE on RAN4 RRM/Demod Specifications | Samsung | imported from 3GU |
R4‑140056 | On feasibility of blind detection for NAICS receiver | Samsung | imported from 3GU |
R4‑140057 | Performance evaluation of blind detection for NAICS receiver | Samsung | imported from 3GU |
R4‑140058 | Phase 2 performance evaluation for NAICS receiver | Samsung | imported from 3GU |
R4‑140059 | TR 36.833-1-39 V1.0.0 LTE Advanced intra-band contiguous Carrier Aggregation for Band 39 | CMCC | imported from 3GU |
R4‑140060 | Text proposal on background of CA_C_B39 | CMCC | imported from 3GU |
R4‑140061 | New WID - LTE Advanced intra-band contiguous Carrier Aggregation in Band 40 for 3DL | CMCC | imported from 3GU |
R4‑140062 | TP on A-MPR for CA_C_B39 | CMCC | imported from 3GU |
R4‑140063 | CA_3C is adding 100RB+75RB uplink configuration for reference sensitivity | China Unicom | imported from 3GU |
R4‑140064 | CR for TS36.101 on CA_C_B39 | CMCC, Nokia Corporation | imported from 3GU |
R4‑140065 | TP for TR 36.851: Rib values for CA_39A-41A | CMCC | imported from 3GU |
R4‑140066 | Introduction of TDD inter-band CA_B39_B41 into 36.101 | CMCC | imported from 3GU |
R4‑140067 | TS36.104 changes for B39 CA | NSN, CMCC, CATT, ZTE | imported from 3GU |
R4‑140068 | TS36.141 change for B39 CA | NSN, CMCC, CATT, ZTE | imported from 3GU |
R4‑140069 | Introduction of CA band combination Band 39+Band 41 into BS specification | CATT, CMCC, Huawei, ZTE | imported from 3GU |
R4‑140070 | Introduction of CA band combination Band 39+Band 41 into BS specification | CATT, CMCC, Huawei, ZTE | imported from 3GU |
R4‑140071 | RF switching time in HD-FDD and its impact to the demodulation | MediaTek Inc. | imported from 3GU |
R4‑140072 | Discussions on test for reporting mode 3-2 | MediaTek Inc. | imported from 3GU |
R4‑140073 | Introduction of CA_39A-41A to TS 36.307 | Huawei, Hisilicon, CMCC, CATT | imported from 3GU |
R4‑140074 | Introduction of CA_39A-41A to TS 36.307 | Huawei, Hisilicon, CMCC, CATT | imported from 3GU |
R4‑140075 | Introduction of CA_39A-41A to TS 36.307 | Huawei, Hisilicon, CMCC, CATT | imported from 3GU |
R4‑140076 | TP on TR 36.833-5-41: Maximum input level for 3DL CA in band 41 | CMCC, NTT DOCOMO, INC., Sprint, SoftBank | imported from 3GU |
R4‑140077 | TR 36.861 v0.3.0 (LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz) | KT, SK Telecom, LG Uplus, LG Electronics, Ericsson | imported from 3GU |
R4‑140078 | TP for TR36.851: LTE_CA_B3_B27 | KT | imported from 3GU |
R4‑140079 | TP for TR36.851: Operating Bands for LTE_CA_B8_B27 | KT | imported from 3GU |
R4‑140080 | Introduction of CA band B3+B27 to TS36.101 | KT | imported from 3GU |
R4‑140081 | Introduction of CA band combination Band 3 and Band 27 to TS 36.104 | KT | imported from 3GU |
R4‑140082 | Introduction of CA band combination Band 3 and Band 27 to TS 36.141 | KT | imported from 3GU |
R4‑140083 | Introduction of CA band B3+B27 to TS36.307 Rel-10 | KT | imported from 3GU |
R4‑140084 | Introduction of CA band B3+B27 to TS36.307 Rel-11 | KT | imported from 3GU |
R4‑140085 | Introduction of CA band combination Band 3 and Band 27 to TS 36.307 | KT | imported from 3GU |
R4‑140086 | Revised WID: LTE_CA_B3_B27 | KT | imported from 3GU |
R4‑140087 | Introduction of CA_39C to TS 36.307 | CATT, CMCC, ZTE | imported from 3GU |
R4‑140088 | Introduction of CA_39C to TS 36.307 | CATT, CMCC, ZTE | imported from 3GU |
R4‑140089 | Introduction of CA_39C to TS 36.307 | CATT, CMCC, ZTE | imported from 3GU |
R4‑140090 | Further consideration on FeICIC rank testing | Huawei, HiSilicon | imported from 3GU |
R4‑140091 | Discussion and simulation results for EPDCCH test cases | Huawei, HiSilicon | imported from 3GU |
R4‑140092 | CR of EPDCCH localzied test with TM10 QCL Type-B configuration (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑140093 | CR of EPDCCH localzied test with TM10 QCL Type-B configuration (Rel-12) | Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Intel, Qualcomm | imported from 3GU |
R4‑140094 | Discussin on test cases of R.12 4TX codebook for downlink MIMO enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑140095 | Discussin on test cases of PUSCH 3-2 feedback for downlink MIMO enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑140096 | Updated TR 36.833-2-03 for LTE-A intra-band non-contiguous Carrier Aggregation in Band 3 | SK Telecom | imported from 3GU |
R4‑140097 | Redundant parameters in Test case A.5.3, UTRA TDD to E-UTRA handover: unknown target cell | Anritsu | imported from 3GU |
R4‑140098 | Redundant parameters in Test case A.5.3, UTRA TDD to E-UTRA handover: unknown target cell | Anritsu | imported from 3GU |
R4‑140099 | Redundant parameters in Test case A.5.3, UTRA TDD to E-UTRA handover: unknown target cell | Anritsu | imported from 3GU |
R4‑140100 | Spectral density for unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑140101 | Spectral density for unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑140102 | Spectral density for unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑140103 | Clarification of EPDCCH demodulation tests | Anritsu | imported from 3GU |
R4‑140104 | Clarification of EPDCCH demodulation tests | Anritsu | imported from 3GU |
R4‑140105 | Correlation Matrix and Antenna Configuration for RRM Test Cases | Anritsu | imported from 3GU |
R4‑140106 | Correlation Matrix and Antenna Configuration for RRM Test Cases | Anritsu | imported from 3GU |
R4‑140107 | Correlation Matrix and Antenna Configuration for RRM Test Cases | Anritsu | imported from 3GU |
R4‑140108 | Correlation Matrix and Antenna Configuration for RRM Test Cases | Anritsu | imported from 3GU |
R4‑140109 | Blind detection performance and complexity | Huawei, HiSilicon | imported from 3GU |
R4‑140110 | Some corrections for MB-MSR in TS37.141 | Huawei | imported from 3GU |
R4‑140111 | Some corrections for MB-MSR in TS 37.141 | Huawei | imported from 3GU |
R4‑140112 | Update of TR37.812 | Huawei | imported from 3GU |
R4‑140113 | Discussion on UE specification impact for MTC | Huawei | imported from 3GU |
R4‑140114 | Discussion on BS specification impact for MTC | Huawei | imported from 3GU |
R4‑140115 | Reduced bandwidth impact on reference sensitivity for MTC UE | Huawei | imported from 3GU |
R4‑140116 | Single RX impact on reference sensitivity for MTC UE | Huawei | imported from 3GU |
R4‑140117 | Further discussion on reference measurement channel for MTC UE | Huawei | imported from 3GU |
R4‑140118 | Simulation results of co-existence study for TDD eIMTA | Huawei | imported from 3GU |
R4‑140119 | TR 36.860 v0.6.0 Dual uplink inter-band CA (2014-02) | Huawei | imported from 3GU |
R4‑140120 | Further discussion of BS RF requirements | Huawei | imported from 3GU |
R4‑140121 | Correction of Transmitter ON OFF requirement (TS 36.104 Rel-12) | Huawei | imported from 3GU |
R4‑140122 | Correction of Transmitter ON OFF requirement (TS 36.141 Rel-12) | Huawei | imported from 3GU |
R4‑140123 | Correction of Transmitter ON OFF requirement (TS 37.104 Rel-12) | Huawei | imported from 3GU |
R4‑140124 | Correction of Transmitter ON OFF requirement (TS 37.141 Rel-12) | Huawei | imported from 3GU |
R4‑140125 | BS requirements for 256QAM | Huawei | imported from 3GU |
R4‑140126 | UE requirements for 256QAM | Huawei | imported from 3GU |
R4‑140127 | New WI Proposal: LTE Advanced inter-band Carrier Aggregation of Band 41 and Band 42 | Huawei | imported from 3GU |
R4‑140128 | WF for maximum input level for Intra band C and NC 3 DLCA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140129 | Demodulation and CSI performance requirements for CA_27B | Qualcomm Incorporated | imported from 3GU |
R4‑140130 | Band Option for 2GHz MSS Band | KT | imported from 3GU |
R4‑140131 | TP for TR 36.853: for LTE_CA_B1_B3_B8 | KT | imported from 3GU |
R4‑140132 | TP for TR 36.853: for LTE_CA_B3_B8_B27 | KT | imported from 3GU |
R4‑140133 | Revised SID:Study on LTE FDD in the bands 1980-2010MHz and 2170-2220 MHz | KT | imported from 3GU |
R4‑140134 | Band Option for TDD-FDD Carrier Aggregation | KT | imported from 3GU |
R4‑140135 | Revised WID: LTE_CA_B8_B27 | KT | imported from 3GU |
R4‑140136 | Discussion on insertion loss for inter-band CA Band 8 and Band 27 | KT | imported from 3GU |
R4‑140137 | TP for TR 36.861 LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz | SK Telecom | imported from 3GU |
R4‑140138 | Performance requirements for CA_B23 | Qualcomm Incorporated | imported from 3GU |
R4‑140139 | MBMS BLER measurement | Qualcomm Incorporated | imported from 3GU |
R4‑140140 | Test framework for Rel-12 DL MIMO enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑140141 | Simulation results for CoMP TDD CSI tests | Qualcomm Incorporated | imported from 3GU |
R4‑140142 | Scalable CA demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑140143 | UL configuration for REFSENS requirements of CA_2A-2A | Samsung | imported from 3GU |
R4‑140144 | CR on TM3 demodulation and soft buffer management test (Rel-12) | Qualcomm Incorporated | imported from 3GU |
R4‑140145 | Updates on test case A.9.1.17 FDD—FDD Inter frequency case for 5MHz Bandwidth for R12 | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑140146 | CR on test point clarification for CA demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑140147 | Correction on the SNR values of in-sync RLM test for 5MHz | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑140148 | CR on propagation condition for soft buffer management test | Qualcomm Incorporated | imported from 3GU |
R4‑140149 | CR for editorial correction for CoMP demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑140150 | CR for editorial correction for CoMP demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑140151 | CR on reference measurement channel for TM10 PDSCH demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑140152 | CR on reference measurement channel for TM10 PDSCH demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑140153 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑140154 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑140155 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑140156 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑140157 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑140158 | B42/B43 UE co-existence requirements | Huawei, Hisilicon | imported from 3GU |
R4‑140159 | Initial discussion of UE issues for B1+B3 | Huawei, Hisilicon | imported from 3GU |
R4‑140160 | Additional insertion loss for UE supporting low-high TDD-FDD CA | Huawei, Hisilicon | imported from 3GU |
R4‑140161 | Discussion on the new OCNG & RMC for E-UTRA TDD with 5MHz bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑140162 | Disucssion on the new OCNG pattern for 3MHz bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑140163 | Power imbalance for intra-band Non-contiguous CA | Samsung | imported from 3GU |
R4‑140164 | E-UTRAN TDD Event triggered reporting under deactivated Scell in non-DRX for 3MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140165 | Discussion on Increasing the minimum number of carriers for UE monitoring | Huawei, HiSilicon | imported from 3GU |
R4‑140166 | Discussion on Rx requirements for CA Bandwidth class D | Samsung | imported from 3GU |
R4‑140167 | TP on TR36.855 Performance characterization of Wide and Small BW RSTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑140168 | TP on introducing channel bandwidth combination table for 3DL non-contiguous CA in band 41 | Samsung | imported from 3GU |
R4‑140169 | Discussion on the new RMC configurations for 3MHz bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑140170 | E-UTRAN FDD Event triggered reporting under deactivated Scell in non-DRX for 3MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140171 | Discussion on UE behaviour after measurement gap for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140172 | Clarification on UE behaviour after measurement gap for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140173 | Draft TR 36.855 v0.2.0 Feasibility of positioning enhancements for E-UTRA (2014-02) | Huawei, HiSilicon | imported from 3GU |
R4‑140174 | Further discussion on UE behaviour after measurement gap for Rel-12 | CATT | imported from 3GU |
R4‑140175 | Further simulation results on RSTD measurement under smaller BW | Huawei, HiSilicon | imported from 3GU |
R4‑140176 | UE behaviour after measurement gap for Rel-12 | CATT | imported from 3GU |
R4‑140177 | Correction on RF channels | Huawei | imported from 3GU |
R4‑140178 | Simulation results on UE Rx-Tx measurement under smaller and wider BW | Huawei, HiSilicon | imported from 3GU |
R4‑140179 | Correction on RF channels | Huawei | imported from 3GU |
R4‑140180 | Discussion on applicability for RRM requirements on TDD UL-DL configuration | CATT | imported from 3GU |
R4‑140181 | Correction on RF channels | Huawei | imported from 3GU |
R4‑140182 | Simulation assumptions for positioning performance evaluation in same PCI scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑140183 | Discussion on increase for minimum number of carriers a UE can monitor for E-UTRA | CATT | imported from 3GU |
R4‑140184 | Correction on tested frequency range | Huawei | imported from 3GU |
R4‑140185 | eCID enhancement in non-collocated serving cell scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑140186 | Correction on tested frequency range | Huawei | imported from 3GU |
R4‑140187 | Correction on tested frequency range | Huawei | imported from 3GU |
R4‑140188 | Increasing minimum number of carriers E-UTRA UE can monitor | CATT | imported from 3GU |
R4‑140189 | Further disucssion on half duplex FDD for low complexity MTC | Huawei, HiSilicon | imported from 3GU |
R4‑140190 | TR skeleton for LTE Advanced Intra-band NC CA in Band 42 | Huawei, Hisilicon | imported from 3GU |
R4‑140191 | Reply LS on half duplex FDD operation for Low complexity MTC UE | Huawei, HiSilicon | imported from 3GU |
R4‑140192 | TP for TR36.833-2-42: Operating bands and channel bandwidths | Huawei, Hisilicon | imported from 3GU |
R4‑140193 | Discussion on UE behaviour when max time difference on UL is reached | Huawei, HiSilicon | imported from 3GU |
R4‑140194 | TP for TR36.833-2-42: BS Co-existence study | Huawei, Hisilicon | imported from 3GU |
R4‑140195 | Discussion on beam declartion for AAS | CATT | imported from 3GU |
R4‑140196 | Clarification on UE bahavior considering max transmit timing difference between TAGs r11 | Huawei, HiSilicon | imported from 3GU |
R4‑140197 | Discussion on accuracy requirement on radiated transmit power | CATT | imported from 3GU |
R4‑140198 | Clarification on UE bahavior considering max transmit timing difference between TAGs r12 | Huawei, HiSilicon | imported from 3GU |
R4‑140199 | Correction on PDSCH allocation in PRS subframe r09 | Huawei, HiSilicon | imported from 3GU |
R4‑140200 | New WI Proposal: Additional bandwidth combinations for intra-band non-contiguous CA in Band 25 | Huawei, Telus | imported from 3GU |
R4‑140201 | Correction on PDSCH allocation in PRS subframe r10 | Huawei, HiSilicon | imported from 3GU |
R4‑140202 | Correction on PDSCH allocation in PRS subframe r11 | Huawei, HiSilicon | imported from 3GU |
R4‑140203 | Test Model for BC3 BS | CATT | imported from 3GU |
R4‑140204 | Correction on PDSCH allocation in PRS subframe r12 | Huawei, HiSilicon | imported from 3GU |
R4‑140205 | Test models for BC3 BS | CATT, Ericsson | imported from 3GU |
R4‑140206 | Test case list for CA RRM requirements with multiple TAGs | Huawei, HiSilicon | imported from 3GU |
R4‑140207 | Test models for BC3 BS | CATT, Ericsson | imported from 3GU |
R4‑140208 | Test models for BC3 BS | CATT, Ericsson | imported from 3GU |
R4‑140209 | Wayforward on test case list for CA RRM requirement with multiple TAGs | Huawei, HiSilicon | imported from 3GU |
R4‑140210 | Differential accuracy of Primary CCPCH power | CATT | imported from 3GU |
R4‑140211 | Summary of RSTD link level simulation under wider and smaller BW | Huawei, HiSilicon | imported from 3GU |
R4‑140212 | Differential accuracy of Primary CCPCH power | ZTE, CATT | imported from 3GU |
R4‑140213 | Differential accuracy of Primary CCPCH power | ZTE, CATT | imported from 3GU |
R4‑140214 | Differential accuracy of Primary CCPCH power | ZTE, CATT | imported from 3GU |
R4‑140215 | Initial simulation results for positioning enhancements in same PCI scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑140216 | intraduction on multi-band operation to 25.142 | CATT | imported from 3GU |
R4‑140217 | Initial simulation results of RSRP/RSRQ measurement performance for LC-MTC | Huawei, HiSilicon | imported from 3GU |
R4‑140218 | LS on UE behaviour considering max transmit timing difference between TAGs | Huawei, HiSilicon | imported from 3GU |
R4‑140219 | TR Skeleton for LTE-A intra-band contiguous CA in Band 42 (TR 36833-1-42 v0.0.1) | CATT | imported from 3GU |
R4‑140220 | TP on TR36.855 network scenarios for positioning enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑140221 | Work plan for LTE-A intra-band contiguous CA in Band 42 | CATT | imported from 3GU |
R4‑140222 | TP on operating bands and channel bandwidth for intra-band CA in Band 42 | CATT | imported from 3GU |
R4‑140223 | TP on TR36.855 simulation assumption for RSTD measurement under small BW | Huawei, HiSilicon | imported from 3GU |
R4‑140224 | TP on spectrum and regulatory review for intra-band CA in Band 42 | CATT | imported from 3GU |
R4‑140225 | TP on TR36.855 simulation assumption on UE Rx-Tx time difference measurement under small BW | Huawei, HiSilicon | imported from 3GU |
R4‑140226 | Text proposal for TR 36.860: REFSENS for dual uplink inter-band CA | ZTE | imported from 3GU |
R4‑140227 | Clarification on FDD reference measurement channels for 5 MHz tests | Huawei, HiSilicon | imported from 3GU |
R4‑140228 | Text proposal for TR 36.833-4: REFSENS for dual uplink intra-band non-contiguous CA | ZTE | imported from 3GU |
R4‑140229 | E-UTRAN FDD absolute and relative RSRP accuracies in CA for 5MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140230 | E-UTRAN TDD absolute and relative RSRP accuracies in CA for 5MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140231 | E-UTRAN FDD absolute and relative RSRP accuracies in CA for 3MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140232 | E-UTRAN TDD absolute and relative RSRP accuracies in CA for 3MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140233 | Discussion on bandwidth applicability for RSRP/RSRQ and UE Rx-Tx time aspects in FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑140234 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R11 | Huawei, HiSilicon | imported from 3GU |
R4‑140235 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140236 | Simulation assumptions for inter-frequency RSRP/RSRQ measurement accuracy under TDD UL/DL configuration 0 | Huawei, HiSilicon | imported from 3GU |
R4‑140237 | Simulation Results on RSRP/RSRQ measurement accuracy in high doppler case | Huawei, HiSilicon | imported from 3GU |
R4‑140238 | Simulation assumptions for MBSFN RSRP/RSRQ measurement accuracy | Huawei, HiSilicon | imported from 3GU |
R4‑140239 | Examples of Technical Specification for AAS | Huawei | imported from 3GU |
R4‑140240 | Technical Report for AAS WI Ver 0.0.1 | Huawei, NEC | imported from 3GU |
R4‑140241 | WF on handling TDD-FDD CA sample bands in Rel-12 | NTT DOCOMO, INC. | imported from 3GU |
R4‑140242 | Text Proposal for AAS WI Objectives | Huawei | imported from 3GU |
R4‑140243 | Impact level of TDD-FDD CA introduction on 36.101 | NTT DOCOMO, INC., Nokia Corporation | imported from 3GU |
R4‑140244 | Text Proposal 4.3 AAS BS architecture | Huawei | imported from 3GU |
R4‑140245 | Text Proposals 6.1 Minimum Coupling Loss | Huawei | imported from 3GU |
R4‑140246 | Text Proposal 7.1.1 Beam definitions | Huawei | imported from 3GU |
R4‑140247 | Additional in-band blocking requirement for intra band NC CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140248 | Handling RF components specifications for inter band CA 2UL | NTT DOCOMO, INC. | imported from 3GU |
R4‑140249 | Consideration of passband width for 1980-2010 MHz & 2170-2200 MHz Bands | NTT DOCOMO, INC. | imported from 3GU |
R4‑140250 | PRS_RA corrections | Spirent Communications | imported from 3GU |
R4‑140251 | Handling of REFSENS for FDD intra band NC CA for 2UL | NTT DOCOMO, INC. | imported from 3GU |
R4‑140252 | PRS_RA corrections | Spirent Communications | imported from 3GU |
R4‑140253 | PRS_RA corrections | Spirent Communications | imported from 3GU |
R4‑140254 | PRS_RA corrections | Spirent Communications | imported from 3GU |
R4‑140255 | Text Proposal 7.1.2 Accuracy and uncertainty | Huawei | imported from 3GU |
R4‑140256 | Text Proposal 8.1 Conducted transmitter requirements | Huawei | imported from 3GU |
R4‑140257 | Text Proposal 8.2 Conducted receiver requirements | Huawei | imported from 3GU |
R4‑140258 | Rx Summary of the core and conformance testing requirements for AAS Reception | Huawei | imported from 3GU |
R4‑140259 | TPs for AAS basic terminologies | ZTE, Kathrein, Tejet | imported from 3GU |
R4‑140260 | AAS conformance test aspects | ZTE, Tejet | imported from 3GU |
R4‑140261 | AAS specification structure and requirements mapping | ZTE, Tejet | imported from 3GU |
R4‑140262 | TPs for AAS hybrid test methodology | ZTE, Tejet | imported from 3GU |
R4‑140263 | TPs for AAS spatial MCL | ZTE, Tejet | imported from 3GU |
R4‑140264 | Further proposals on AAS beam definitions | ZTE, Tejet | imported from 3GU |
R4‑140265 | AAS EVM Requirements | ZTE, Tejet | imported from 3GU |
R4‑140266 | TPs for EIRP and EIRS requirements | ZTE, Tejet | imported from 3GU |
R4‑140267 | New LTE-A CA work item proposal | ZTE, Tejet | imported from 3GU |
R4‑140268 | Skeleton TR 36.833-6-41 | Sprint | imported from 3GU |
R4‑140269 | TP for TR 36.833-6-41: Work plan on LTE Advanced intra-band contiguous Carrier Aggregation in Band 41 for 3DL | Sprint | imported from 3GU |
R4‑140270 | TP for TR 36.833-6-41: Specification changes needed for 3CC Intra-band non-contiguous CA in Band 41 | Sprint | imported from 3GU |
R4‑140271 | Updated WID - LTE Advanced intra-band contiguous Carrier Aggregation in Band 41 for 3DL | Sprint | imported from 3GU |
R4‑140272 | Consideration on BS Specification for TDD-FDD joint operation including Carrier Aggregation | NTT DOCOMO | imported from 3GU |
R4‑140273 | Consideration on Unwanted Emissions for AAS BS | NTT DOCOMO | imported from 3GU |
R4‑140274 | Proposed New WI: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 19 and Band 21 | NTT DOCOMO | imported from 3GU |
R4‑140275 | Wayforward on the RRM CA test case list of 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140276 | E-UTRAN FDD Event triggered reporting under deactivated Scell in non-DRX for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140277 | E-UTRAN TDD Event triggered reporting under deactivated Scell in non-DRX for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140278 | Discussion on the initial transmit timing requirements in first transmission of DRX for Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑140279 | Correct transmit timing requirements in first transmission in a DRX for Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑140280 | Discussion on the test case of transmit timing of DRX for Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑140281 | Correct the configuration of transmit timing test case in DRX for Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑140282 | Discussion on TDD UL-DL configuration applicability in CA | Huawei, HiSilicon | imported from 3GU |
R4‑140283 | Clarifications on TDD UL-DL configuration applicability for R11 | Huawei, HiSilicon | imported from 3GU |
R4‑140284 | Clarifications on TDD UL-DL configuration applicability for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140285 | Clarification of BW applicability in Rx-Tx Time Difference measurement R11 | Huawei, HiSilicon | imported from 3GU |
R4‑140286 | Clarification of BW applicability in Rx-Tx Time Difference measurement R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140287 | Discussion on the requirements of CGI in CA scenario | Huawei, HiSilicon | imported from 3GU |
R4‑140288 | Discussion on the RRM requirements applicability for TDD UL/DL configuration 0 | Huawei, HiSilicon | imported from 3GU |
R4‑140289 | Wayforward on RRM requirements applicability for TDD UL/DL configuration 0 | Huawei, HiSilicon | imported from 3GU |
R4‑140290 | Wayforward on introducing a new WI for RRM requirements under high doppler | Huawei, HiSilicon | imported from 3GU |
R4‑140291 | Feasibility of UE CA scalable performance requirement | Huawei,HiSilicon | imported from 3GU |
R4‑140292 | Way forward on the scalability issue for CA demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑140293 | 15MHz based CA SDR test | Huawei, HiSilicon | imported from 3GU |
R4‑140294 | Performance requirements for intraband-non-contiguous CA | Qualcomm Incorporated | imported from 3GU |
R4‑140295 | Discussion on the candidate solutions for offloading purpose for Hetnet mobility | Huawei, HiSilicon | imported from 3GU |
R4‑140296 | CR for introduction of15MHz based SDR tests and test point table in Rel-10 | Huawei, HiSilicon | imported from 3GU |
R4‑140297 | CR for introduction of 15MHz based SDR tests in Rel-11 | Huawei, HiSilicon | imported from 3GU |
R4‑140298 | CR for introduction of 15MHz based single carrier and CA SDR tests in Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑140299 | Preliminary analysis on the RRM impacts of MBSFN RSRP/RSRQ measurement accuracy | Huawei, HiSilicon | imported from 3GU |
R4‑140300 | Remaining issues on TM10 localized ePDCCH demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑140301 | CR for structure change of CA soft buffer tests in Rel-10 | Huawei, HiSilicon | imported from 3GU |
R4‑140302 | CR for maintanence of CA soft buffer tests in Rel-11 | Huawei, HiSilicon | imported from 3GU |
R4‑140303 | CR for TM3 and CA soft buffer tests in Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑140304 | Motivation for new work item on RRM requirements under high Doppler in E-UTRA | Huawei, HiSilicon | imported from 3GU |
R4‑140305 | CR on distributed ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140306 | Performance requirements for intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑140307 | Power imbalance performance requirements for bandwidth class B of contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑140308 | CR on distributed ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140309 | CR: Power imbalance performance requirements for bandwidth class B | Huawei, HiSilicon | imported from 3GU |
R4‑140310 | Draft WID on RRM requirements under high Doppler in E-UTRA | Huawei, HiSilicon | imported from 3GU |
R4‑140311 | CR on TM9 localized ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140312 | Demodulation performance requirements for Band 23 intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑140313 | CR on TM9 localized ePDCCH test | Qualcomm Incorporated, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Intel | imported from 3GU |
R4‑140314 | Way forward for Band 23 performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑140315 | Demodulation performance requirements for Band 27 | Huawei, HiSilicon | imported from 3GU |
R4‑140316 | CR on TM10 localized ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140317 | E-UTRAN FDD absolute and relative RSRQ accuracies in CA for 5MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140318 | CR on TM10 localized ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140319 | E-UTRAN TDD absolute and relative RSRQ accuracies in CA for 5MHz+10MHz | Huawei, HiSilicon | imported from 3GU |
R4‑140320 | CR on reference measurement channel for ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140321 | Way forward on demodulation performance requirements for Band 27 contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑140322 | CR on reference measurement channel for ePDCCH test | Qualcomm Incorporated | imported from 3GU |
R4‑140323 | Introduction of CA performance requirements for Band 23 and Band 27 CA | Huawei, HiSilicon | imported from 3GU |
R4‑140324 | Addition to frequency selective interference of CQI reporting | Huawei, HiSilicon | imported from 3GU |
R4‑140325 | FeICIC PBCH demodulation tests | Huawei, HiSilicon | imported from 3GU |
R4‑140326 | Additional simulation results for FeICIC TDD frequency selective CQI test | Huawei, HiSilicon | imported from 3GU |
R4‑140327 | CR on FeICIC PBCH performance requirement (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑140328 | CR on FeICIC PBCH performance requirement (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑140329 | Cleanup of the specification for FeICIC (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑140330 | Cleanup of the specification for FeICIC (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑140331 | UL-DL configuration and other parameters for FeICIC TDD CQI fading test (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑140332 | UL-DL configuration and other parameters for FeICIC TDD CQI fading test (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑140333 | MTC demodulation performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑140334 | Impact of half duplex on MTC demodulation performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑140335 | TP: impact of MTC on the demodulation performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑140336 | Performance requirement for TDD FDD CA | Huawei, HiSilicon | imported from 3GU |
R4‑140337 | New Work Item Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 3 and Band 26 | China Telecom | imported from 3GU |
R4‑140338 | TP for TR 36.853: For LTE_CA_B1_B3_B5 | SK Telecom | imported from 3GU |
R4‑140339 | Proposed passband width for 1980-2010 MHz & 2170-2200 MHz Bands | SK Telecom | imported from 3GU |
R4‑140340 | RSRP and RSRQ simulation results in high Doppler conditions | ZTE | imported from 3GU |
R4‑140341 | Discussion on LC-MTC half duplex guard period | ZTE | imported from 3GU |
R4‑140342 | CSI requirements for DL MIMO enhancement | ZTE | imported from 3GU |
R4‑140343 | Simulation results for TDD static CQI test | ZTE | imported from 3GU |
R4‑140344 | Simulation results for COMP TDD fading CQI test | ZTE | imported from 3GU |
R4‑140345 | CR for TS36.101 COMP demodulation requirements | ZTE | imported from 3GU |
R4‑140346 | CR for TS36.101 COMP demodulation requirements | ZTE | imported from 3GU |
R4‑140347 | Link performance for NAICS receivers with blind detection | LG Electronics | imported from 3GU |
R4‑140348 | Discussion on DL CoMP with CRS-IC | LG Electronics | imported from 3GU |
R4‑140349 | Simulation results for ePDCCH demodulation test | LG Electronics | imported from 3GU |
R4‑140350 | Simulation assumptions of cell identification and RSRP,RSRQ measurement for eIMTA | LG Electronics | imported from 3GU |
R4‑140351 | Discussion about test coverage of Further Downlink MIMO enhancement | LG Electronics | imported from 3GU |
R4‑140352 | Preliminary simulation results of RSRP and RSRQ for eIMTA in Rel-12 | LG Electronics | imported from 3GU |
R4‑140353 | Simulation results of RSRP and RSRQ for high doppler case | LG Electronics | imported from 3GU |
R4‑140354 | Discussion of RLM for high doppler case | LG Electronics | imported from 3GU |
R4‑140355 | CR on reporting delay in E-UTRAN TDD-TDD Inter-frequency event triggered reporting test case | LG Electronics | imported from 3GU |
R4‑140356 | CR on reporting delay in E-UTRAN TDD-TDD and FDD-TDD Inter-frequency event triggered reporting test case | LG Electronics | imported from 3GU |
R4‑140357 | CR on reporting delay in E-UTRAN TDD-TDD and FDD-TDD Inter-frequency event triggered reporting test case | LG Electronics | imported from 3GU |
R4‑140358 | CR on reporting delay in E-UTRAN TDD-TDD and FDD-TDD Inter-frequency event triggered reporting test case | LG Electronics | imported from 3GU |
R4‑140359 | CR for Combinations of channel model parameters | Huawei, HiSilicon | imported from 3GU |
R4‑140360 | CR on reporting delay in E-UTRAN TDD-TDD and FDD-TDD Inter-frequency event triggered reporting test case | LG Electronics | imported from 3GU |
R4‑140361 | CR for EPDCCH power allocation (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑140362 | CR for Combinations of channel model parameters | Huawei, HiSilicon, Ericsson | imported from 3GU |
R4‑140363 | CR for EPDCCH power allocation (Rel-12) | Huawei, HiSilcon | imported from 3GU |
R4‑140364 | Editorial Correction for TS36.101 Rel-12 | KT | imported from 3GU |
R4‑140365 | TR 36.866 V1.1.0: Draft TP on Updated Phase-2 Evaluation Results of SLIC | NTT DOCOMO | imported from 3GU |
R4‑140366 | New Work Item proposal: CRS Interference Mitigation for Homogenous Deployments | Ericsson | imported from 3GU |
R4‑140367 | UE requirements for eIMTA | Ericsson | imported from 3GU |
R4‑140368 | TP to TR37.814: Required changes to infrastructure specifications | Huawei | imported from 3GU |
R4‑140369 | TP for TR37.814: Coexistence with other systems around/within the band | Huawei | imported from 3GU |
R4‑140370 | TR37.814 TP: Operating band XXXII UARFCN and Operating band 32 EARFCN allocations. | Huawei | imported from 3GU |
R4‑140371 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS37.141 | Huawei | imported from 3GU |
R4‑140372 | Revised WID: LTE Advanced 3 Band Carrier Aggregation(3DL/1UL) for Band 1, Band 3 and Band 5 | SK Telecom | imported from 3GU |
R4‑140373 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS37.113 | Huawei | imported from 3GU |
R4‑140374 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS37.104 | Huawei | imported from 3GU |
R4‑140375 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.143 | Huawei | imported from 3GU |
R4‑140376 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.141 | Huawei | imported from 3GU |
R4‑140377 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.116 | Huawei | imported from 3GU |
R4‑140378 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.113 | Huawei | imported from 3GU |
R4‑140379 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.113 | Huawei | imported from 3GU |
R4‑140380 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.106 | Huawei | imported from 3GU |
R4‑140381 | Consideration on Transmit inter-modulation test methodology for 2ULs inter-band CA UE | LG Electronics | imported from 3GU |
R4‑140382 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS36.104 | Huawei | imported from 3GU |
R4‑140383 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.143 | Huawei | imported from 3GU |
R4‑140384 | Cell detection and radio link monitoring in high Doppler conditions | Ericsson | imported from 3GU |
R4‑140385 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.142 | Huawei | imported from 3GU |
R4‑140386 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.141 | Huawei | imported from 3GU |
R4‑140387 | Cleanup TS 36.141 | Ericsson | imported from 3GU |
R4‑140388 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.113 | Huawei | imported from 3GU |
R4‑140389 | RSRP and RSRQ measurement accuracy in high Doppler conditions | Ericsson | imported from 3GU |
R4‑140390 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.106 | Huawei | imported from 3GU |
R4‑140391 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.105 | Huawei | imported from 3GU |
R4‑140392 | Work plan for monitoring increased number of carriers | Ericsson | imported from 3GU |
R4‑140393 | Cleanup TS 36.141 | Ericsson | imported from 3GU |
R4‑140394 | TP for TR37.814: Required changes for the introduction of operating band 32 in TS25.104 | Huawei | imported from 3GU |
R4‑140395 | Increasing the minimum requirements for number of carriers which can be monitored in E-UTRA connected mode | Ericsson | imported from 3GU |
R4‑140396 | Increasing the minimum requirements for number of carriers which can be monitored in E-UTRA idle mode | Ericsson | imported from 3GU |
R4‑140397 | Increasing the minimum requirements for number of carriers which can be monitored in UTRA connected states | Ericsson | imported from 3GU |
R4‑140398 | Increasing the minimum requirements for number of carriers which can be monitored in UTRA idle mode | Ericsson | imported from 3GU |
R4‑140399 | Introduction of operating band 32 | Huawei | imported from 3GU |
R4‑140400 | Consideration on remaining receiver requirements for 2ULs inter-band CA UE | LG Electronics | imported from 3GU |
R4‑140401 | LS Out on RAN4 agreements on 'Increasing the minimum requirements for number of carriers' affecting RAN2 specs | Ericsson | imported from 3GU |
R4‑140402 | Motivation for burst gap pattern for relaxed performance requirements in interfrequency small cell discovery | Ericsson | imported from 3GU |
R4‑140403 | Response LS to RAN2 on relaxed performance requirement | Ericsson | imported from 3GU |
R4‑140404 | TP for TR 36.851: B1+B5 Harmonic and IMD analysis for 3DLs CA_1A_5A_7A band combination UE | LG Electronics, LG UPlus | imported from 3GU |
R4‑140405 | Transmit timing requirements and test cases | Ericsson | imported from 3GU |
R4‑140406 | Introduction of operating band 32 | Huawei | imported from 3GU |
R4‑140407 | Introduction of requirements for first transmission timing when there has been a related earlier transmission. | Ericsson | imported from 3GU |
R4‑140408 | Introduction of operating band 32 | Huawei | imported from 3GU |
R4‑140409 | Increasing RSRQ reporting range | Ericsson | imported from 3GU |
R4‑140410 | TP for UE TX requirements for S-band UE | LG Electronics | imported from 3GU |
R4‑140411 | RRM Test Case List for 10 MHz+3MHz bandwidth in CA | Ericsson, Huawei | imported from 3GU |
R4‑140412 | TP for UE RX requirements for S-band UE | LG Electronics | imported from 3GU |
R4‑140413 | Introduction of test cases for 10MHz +3MHz : Event triggered reporting on deactivating Scells in non-DRX FDD and TDD | Ericsson | imported from 3GU |
R4‑140414 | Introduction of test cases for 10MHz +3MHz : absolute and relative RSRP and RSRQ accuracies in CA for FDD and TDD. | Ericsson | imported from 3GU |
R4‑140415 | Feasibility and requirements for increasing UTRA neighbour cell list sizes | Ericsson | imported from 3GU |
R4‑140416 | A-MPR analysis for S-band UE coexistence with Band 34 | LG Electronics | imported from 3GU |
R4‑140417 | Reply LS on extending the size of the neighbour cell list | Ericsson | imported from 3GU |
R4‑140418 | Correction to E-UTRA cell FACH reselection requirement | Ericsson | imported from 3GU |
R4‑140419 | Correction to E-UTRA cell FACH reselection requirement | Ericsson | imported from 3GU |
R4‑140420 | Corrections to CELL FACH test cases release 11 | Ericsson | imported from 3GU |
R4‑140421 | Introduction of operating band 32 in TS36.124 | Huawei | imported from 3GU |
R4‑140422 | Corrections to CELL FACH test cases release 12 | Ericsson | imported from 3GU |
R4‑140423 | DRX measurements in cell FACH state | Ericsson | imported from 3GU |
R4‑140424 | Introduction of operating band 32 in TS36.116 | Huawei | imported from 3GU |
R4‑140425 | Introduction of operating band 32 in TS36.113 | Huawei | imported from 3GU |
R4‑140426 | Introduction of operating band 32 in TS36.104 | Huawei | imported from 3GU |
R4‑140427 | Introduction of operating band XXXII/32 in TS25.466 | Huawei | imported from 3GU |
R4‑140428 | Introduction of operating band XXXII/32 in TS25.461 | Huawei | imported from 3GU |
R4‑140429 | Introduction of operating band XXXII in TS34.124 | Huawei | imported from 3GU |
R4‑140430 | Introduction of operating band XXXII in TS25.113 | Huawei | imported from 3GU |
R4‑140431 | Introduction of operating band XXXII in TS25.105 | Huawei | imported from 3GU |
R4‑140432 | Introduction of operating band XXXII in TS25.104 | Huawei | imported from 3GU |
R4‑140433 | LC-MTC HD-FDD switching time calculation analysis | InterDigital | imported from 3GU |
R4‑140434 | Work Plan for CA_B1_B28 | KDDI | imported from 3GU |
R4‑140435 | TP for TR37.814: L-band operation in Region 3 | KDDI | imported from 3GU |
R4‑140436 | Further analysis encouragement for LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz | KDDI | imported from 3GU |
R4‑140437 | New Work Item proposal: Inter-band CA of Band 18 and Band 28 | KDDI | imported from 3GU |
R4‑140438 | Operational flexibility for Band 28 | KDDI | imported from 3GU |
R4‑140439 | REFSENS Specification of the CA_2A-2A | Ericsson | imported from 3GU |
R4‑140440 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140441 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140442 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140443 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140444 | Updates to TR 36.833-2-02: LTE Advanced intra band non contiguous Carrier Aggregation (CA) in Band 2 | Ericsson | imported from 3GU |
R4‑140445 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140446 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140447 | Clarification of UE capabilities of contiguous and non-contiguous CA in the same band | Ericsson | imported from 3GU |
R4‑140448 | Clarifications to Single Cluster Channel Model in TR 37.977 Clause 6 | Spirent Communications, Anite Telecoms Ltd | imported from 3GU |
R4‑140449 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 28) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑140450 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 28) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑140451 | Significant Figures for AoAs and AoDs for UMa-based Channel Models in TR 37.977 | Spirent Communications, Anite Telecoms Ltd | imported from 3GU |
R4‑140452 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 4 + 5) | Alcatel-Lucent | imported from 3GU |
R4‑140453 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 4 + 5) | Alcatel-Lucent | imported from 3GU |
R4‑140454 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 4 + 12) | Alcatel-Lucent | imported from 3GU |
R4‑140455 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 4 + 12) | Alcatel-Lucent | imported from 3GU |
R4‑140456 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 4 + 13) | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑140457 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 4 + 13) | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑140458 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 5 + 12) | Alcatel-Lucent | imported from 3GU |
R4‑140459 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 5 + 12) | Alcatel-Lucent | imported from 3GU |
R4‑140460 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 5 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140461 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 5 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140462 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 12 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140463 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 12 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140464 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 29 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140465 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 29 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140466 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 5 + 12) | Alcatel-Lucent | imported from 3GU |
R4‑140467 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 5 + 12) | Alcatel-Lucent | imported from 3GU |
R4‑140468 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 5 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140469 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 5 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140470 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140471 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140472 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 29 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140473 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 29 + 30) | Alcatel-Lucent | imported from 3GU |
R4‑140474 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (12 + 30) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑140475 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (12 + 30) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑140476 | TP for TR36.851 (Release 12): TIB and RIB values of LTE-A Inter-band Carrier Aggregation of Band 12 and Band 30 (1UL) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑140477 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140478 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140479 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140480 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140481 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140482 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140483 | Introduction of multi-band BS testing to TS 36.141 (Clauses 1 5) | Alcatel-Lucent, CATT, Huawei, NSN, ZTE, Ericsson | imported from 3GU |
R4‑140484 | Introduction of multi-band BS testing to TS 36.141 (Clauses 1 - 5) | Alcatel-Lucent, CATT, Huawei, NSN, ZTE, Ericsson | imported from 3GU |
R4‑140485 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140486 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140487 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140488 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140489 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140490 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140491 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | imported from 3GU |
R4‑140492 | BS test specifications improvement | Ericsson | imported from 3GU |
R4‑140493 | NAICS Phase-2 Evaluations for Blind R-ML Receivers | Qualcomm Incorporated | imported from 3GU |
R4‑140494 | NAICS Phase-2 Evaluations for Blind SLIC Receivers | Qualcomm Incorporated | imported from 3GU |
R4‑140495 | NAICS Receiver Complexity Analysis | Qualcomm Incorporated | imported from 3GU |
R4‑140496 | NAICS Receiver Discussion | Qualcomm Incorporated | imported from 3GU |
R4‑140497 | TP for TR 36.866 [TP to Capture Observations on Blind NAICS Receivers] | Qualcomm Incorporated | imported from 3GU |
R4‑140498 | Rel 11 FeICIC TM9 Test | Qualcomm Incorporated | imported from 3GU |
R4‑140499 | MTC Demodulation Aspects | Qualcomm Incorporated | imported from 3GU |
R4‑140500 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 4, and Band 12 | T-Mobile USA | imported from 3GU |
R4‑140501 | Removing [] in 25.101 in the context of Four transmit antennas for HSDPA | Ericsson | imported from 3GU |
R4‑140502 | Removing [] in 25.101 in the context of Four transmit antennas for HSDPA | Ericsson | imported from 3GU |
R4‑140503 | CoMP: CSI Test results | Ericson | imported from 3GU |
R4‑140504 | CR Comp Test 1A | Ericson | imported from 3GU |
R4‑140505 | Reply LS on the applicability of HPUE for release 8/9/10 devices | Qualcomm Incorporated | imported from 3GU |
R4‑140506 | New Draft WI Proposal: LTE Advanced Carrier Aggregation with 2UL for Band 2 and Band 13 | Verizon | imported from 3GU |
R4‑140507 | CR Comp Test 1A cat A | Ericson | imported from 3GU |
R4‑140508 | E-UTRA aggregate power control over sequence | Qualcomm Incorporated | imported from 3GU |
R4‑140509 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4, and Band 4 | T-Mobile USA | imported from 3GU |
R4‑140510 | EPDCCH test: final simulation results for EPDCCH demodulation performance | Ericson | imported from 3GU |
R4‑140511 | New Draft WI Proposal: LTE Advanced Carrier Aggregation with 2UL for Band 4 and Band 13 | Verizon | imported from 3GU |
R4‑140512 | Release independence for HPUE | Qualcomm Incorporated | imported from 3GU |
R4‑140513 | New Draft WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 5, Band 2 and Band 2 | Verizon | imported from 3GU |
R4‑140514 | Link level simulation results for phase II scenario 1 and scenario 2. | Ericson | imported from 3GU |
R4‑140515 | New Draft WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 5, Band 2 and Band 4 | Verizon | imported from 3GU |
R4‑140516 | Blind detection of NAICS parameters: analysis of performance | Ericson | imported from 3GU |
R4‑140517 | New Draft WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 5, Band 2 and Band 13 | Verizon | imported from 3GU |
R4‑140518 | New Draft WI Proposal: LTE Advanced 2 Band Carrier Aggregation (2DL/1UL) of Band 5 and Band 4 | Verizon | imported from 3GU |
R4‑140519 | Addition of bandwidth combination set for CA_2A-29A and CA_4A-29A | Qualcomm Incorporated, AT&T | imported from 3GU |
R4‑140520 | Blind detection of NAICS parameters: analysis of complexity and potential reduction in complexity | Ericson | imported from 3GU |
R4‑140521 | New Draft WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 5, Band 4 and Band 4 | Verizon | imported from 3GU |
R4‑140522 | Introduction of requirements for SNR test for TM9 | Ericsson | imported from 3GU |
R4‑140523 | New Draft WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 5, Band 4 and Band 13 | Verizon | imported from 3GU |
R4‑140524 | Introduction of requirements for SNR test for TM9 | Ericsson | imported from 3GU |
R4‑140525 | New Draft WI Proposal: LTE Advanced 2 Band Carrier Aggregation (2DL/1UL) of Band 5 and Band 13 | Verizon | imported from 3GU |
R4‑140526 | Summary of simulation results for SNR test for TM9 | Ericson | imported from 3GU |
R4‑140527 | Release independence of Band 14 HPUE | Qualcomm Incorporated | imported from 3GU |
R4‑140528 | CR for 25.101. Correction of Notes and reference to REFSENS table | Ericson | imported from 3GU |
R4‑140529 | Release independence of Band 14 HPUE | Qualcomm Incorporated | imported from 3GU |
R4‑140530 | CR for 25.101. Correction of Notes and reference to REFSENS table | Ericson | imported from 3GU |
R4‑140531 | Release independence of Band 14 HPUE | Qualcomm Incorporated | imported from 3GU |
R4‑140532 | CR for 25.101. Correction of Notes and reference to REFSENS table | Ericson | imported from 3GU |
R4‑140533 | CR for 36.101. Editorial correction on OCNG pattern | Ericsson | imported from 3GU |
R4‑140534 | MPR for single CC non-contiguous allocations | Qualcomm Incorporated | imported from 3GU |
R4‑140535 | CR for 36.101. Editorial correction on OCNG pattern | Ericsson | imported from 3GU |
R4‑140536 | CR for 36.101. Editorial correction on OCNG pattern | Ericsson | imported from 3GU |
R4‑140537 | UE co-existence requirements in different releases | Motorola Solutions | imported from 3GU |
R4‑140538 | Proposal for CA 15+15MHz SDR tests | Ericson | imported from 3GU |
R4‑140539 | RF considerations on intra-band NC CA under non-collocated deployment | Ericson | imported from 3GU |
R4‑140540 | A-MPR for CA_39C emissions to B3 | Qualcomm Incorporated | imported from 3GU |
R4‑140541 | UE performance considerations on intra-band NC CA under non-collocated deployment | Ericson | imported from 3GU |
R4‑140542 | D2D co-existence considerations for adjacent services | Motorola Solutions | imported from 3GU |
R4‑140543 | Simulation results for intra-band contiguous CA for Band 23 | Ericson | imported from 3GU |
R4‑140544 | Further considerations on contiguous UL CA power control | Qualcomm Incorporated | imported from 3GU |
R4‑140545 | Proposals and simulation results for intra-band contiguous CA for Band 27 | Ericsson | imported from 3GU |
R4‑140546 | Proposals and simulation results for intra-band non-contiguous CA for Band 23 | Ericsson | imported from 3GU |
R4‑140547 | Discussion on the applicability of HPUE for earlier releases | Motorola Solutions | imported from 3GU |
R4‑140548 | New WI proposal: Additional bandwidth combinations for LTE Advanced inter-band Carrier Aggregation to support 3DL fallback | Qualcomm Incorporated | imported from 3GU |
R4‑140549 | Methodology on performance requirement for CA 2/3DL CCs in Rel-12 | Ericson | imported from 3GU |
R4‑140550 | [Draft] LS on the applicability of HPUE for releases 8/9/10 devices | Motorola Solutions | imported from 3GU |
R4‑140551 | 3DL CA and support of 2DL fallback | Qualcomm Incorporated | imported from 3GU |
R4‑140552 | Draft WID on interference cancellation for SU-MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑140553 | REFSENS requirements for low cost MTC | NSN, Nokia Corporation | imported from 3GU |
R4‑140554 | 2UL inter-band class A2 specifications | Qualcomm Incorporated | imported from 3GU |
R4‑140555 | PCell Interruptions for Shorter Deactivated SCell Measurement Cycles | Qualcomm Incorporated | imported from 3GU |
R4‑140556 | Discussion on half duplex FDD MTC UE switching time | NSN, Nokia Corporation | imported from 3GU |
R4‑140557 | Reclassification of 2UL CA_3-8 from A2 to A4 | Qualcomm Incorporated, KT | imported from 3GU |
R4‑140558 | PCell Interruptions During Deactivated SCell Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑140559 | A-MPR for MSS and Band 34 coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑140560 | PCell Interruptions During Deactivated SCell Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑140561 | A-MPR for CA_7C emissions to B38 | Qualcomm Incorporated | imported from 3GU |
R4‑140562 | PCell Interruptions During Deactivated SCell Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑140563 | Band 1 and Band 28 class A2 reference sensitivity | Qualcomm Incorporated, KDDI | imported from 3GU |
R4‑140564 | Band 7 and Band 8 class A2 reference sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑140565 | RSRQ Definition | Qualcomm Incorporated | imported from 3GU |
R4‑140566 | Proposa and simulation results for CA high Doppler test | Ericsson | imported from 3GU |
R4‑140567 | Transmit Diversity for PRS | Qualcomm Incorporated | imported from 3GU |
R4‑140568 | E-UTRA Requirements on Increasing Number of Carriers to Monitor | Qualcomm Incorporated | imported from 3GU |
R4‑140569 | New WID: additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 4 and Band 12 | T-Mobile USA | imported from 3GU |
R4‑140570 | RF Issues Regarding Low Cost MTC Devices | NEC | imported from 3GU |
R4‑140571 | RF Issues Regarding Low Cost MTC Devices | NEC | imported from 3GU |
R4‑140572 | Measurements for Support of MBMS | Qualcomm Incorporated | imported from 3GU |
R4‑140573 | RSRP/RSRQ Measurements for Support of MBMS | Qualcomm Incorporated | imported from 3GU |
R4‑140574 | Switching Time for HD-FDD Low Cost MTC Devices | NEC | imported from 3GU |
R4‑140575 | Consideration of IMD4 for 2UL Inter-Band CA from UE Perspective | Intel Corporation | imported from 3GU |
R4‑140576 | Consideration of IMD5 for 2UL Inter-Band CA from UE Perspective | Intel Corporation | imported from 3GU |
R4‑140577 | Higher order IMD and harmonic table for UE self-desensitization analysis | Intel Corporation | imported from 3GU |
R4‑140578 | Initial Discussion on Performance Requirements of MTC UEs | NEC | imported from 3GU |
R4‑140579 | IMD5 analysis in Class A4 for 2UL inter-band CA | Intel Corporation | imported from 3GU |
R4‑140580 | UE RX power difference from 2 CCs in intra-band non-contiguous CA non-collocated BS/RRH scenarios | Intel Corporation | imported from 3GU |
R4‑140581 | Band 42 and Band 43 UE-UE coexistence study | Intel Corporation | imported from 3GU |
R4‑140582 | D2D Co-existence Scenarios to Consider in RAN4 | NEC | imported from 3GU |
R4‑140583 | Justification of UTRA FDD LEE TRP/TRS requirements proposal for bands I and VIII | Intel Corporation | imported from 3GU |
R4‑140584 | CR to TS37.144 on adding UTRA FDD LEE TRP/TRS requirements for Bands I and VIII | Intel Corporation | imported from 3GU |
R4‑140585 | TP for TR36.851 (Rel-12) : Insertion loss value proposal of CA 1+11 | SoftBank Mobile | imported from 3GU |
R4‑140586 | Justification of editorial corrections to the methodology comparison table in TR37.977 | Intel Corporation | imported from 3GU |
R4‑140587 | TP for TR36.851 (Rel-12) : Insertion loss value proposal of CA 8+11 | SoftBank Mobile | imported from 3GU |
R4‑140588 | Revisiting ECC Report 131 | SoftBank Mobile | imported from 3GU |
R4‑140589 | CR to TR37.977 on editorial corrections to the methodology comparison table in TR37.977 | Intel Corporation | imported from 3GU |
R4‑140590 | New WID: Performance requirements for the verification of radiated multi-antenna reception performance of LTE UEs | Intel Corporation | imported from 3GU |
R4‑140591 | Discussion on new codebook test for eDL MIMO enhancement | Intel Corporation | imported from 3GU |
R4‑140592 | Introduction of 15MHz+15MHz sustained data rate test for CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140593 | Discussion on testing of the new CSI feedback mode for eDL MIMO enhancement | Intel Corporation | imported from 3GU |
R4‑140594 | Draft LS on deployment scenario for Intra-band Non-contiguous CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140595 | Remaining details and simulation results for the EPDCCH demodulation tests | Intel Corporation | imported from 3GU |
R4‑140596 | LS on deployment scenario for Intra-band Non-contiguous CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140597 | CRS interference cancellation in CoMP | Qualcomm Incorporated | imported from 3GU |
R4‑140598 | Discussion on performance requirement for intra band NC CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140599 | Simulation results for the EPDCCH based downlink SDR tests | Intel Corporation | imported from 3GU |
R4‑140600 | Power allocation parameters for the EPDCCH tests | Intel Corporation | imported from 3GU |
R4‑140601 | UE reference architectures for LTE FDD-TDD 2DL CA | MediaTek Inc. | imported from 3GU |
R4‑140602 | CR on correction of downlink SDR tests with EPDCCH scheduling (R11) | Intel Corporation | imported from 3GU |
R4‑140603 | CR on correction of downlink SDR tests with EPDCCH scheduling | Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm Incorporated, Huawei, HiSilicon, Ericsson | imported from 3GU |
R4‑140604 | LTE TDD eIMTA feasibility analysis | Intel Corporation | imported from 3GU |
R4‑140605 | More on IMD measurements for 2UL inter-band CA | MediaTek Inc. | imported from 3GU |
R4‑140606 | Maximum input level for intra-band 3DL CA | MediaTek Inc. | imported from 3GU |
R4‑140607 | Discussion on RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑140608 | Discussion on interference signal modulation format detection for NAICS | Intel Corporation | imported from 3GU |
R4‑140609 | Discussion on PDSCH interference signal parameters detection for NAICS | Intel Corporation | imported from 3GU |
R4‑140610 | Test results and discussion on high Doppler impacts for RRM | CMCC | imported from 3GU |
R4‑140611 | Discussion on RRM requirements under high Doppler | Intel Corporation | imported from 3GU |
R4‑140612 | Discussion on RSRQ definition | Intel Corporation | imported from 3GU |
R4‑140613 | Further considerations on the gap pattern in HeNet | Intel Corporation | imported from 3GU |
R4‑140614 | Further study on RSRQ and RS-SINR | Intel Corporation | imported from 3GU |
R4‑140615 | PCell Interruptions with Shorter Measurement Cycles | Alcatel-Lucent | imported from 3GU |
R4‑140616 | Discussion on increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | Intel Corporation | imported from 3GU |
R4‑140617 | Initial discussion on RRM Performance Requirements for Low Cost MTC UEs | Alcatel-Lucent | imported from 3GU |
R4‑140618 | Discussion on LC-MTC and its impact on RRM | Intel Corporation | imported from 3GU |
R4‑140619 | Discussion on the OTDOA enhancement in HetNet scenarios | Intel Corporation | imported from 3GU |
R4‑140620 | UL RTOA Measurement Accuracy Requirements | TruePosition | imported from 3GU |
R4‑140621 | MPR Reduction for NC Resource Allocations | Intel Corporation | imported from 3GU |
R4‑140622 | Text Proposal for TS 36.112 Section 6 | TruePosition | imported from 3GU |
R4‑140623 | Issues with PA Model calibration for standardization | Intel Corporation | imported from 3GU |
R4‑140624 | Test Proposal for TS 36.112 Annex E | TruePosition | imported from 3GU |
R4‑140625 | NS_12 A-MPR | Intel Corporation | imported from 3GU |
R4‑140626 | GNSS-DataBitAssistance for BeiDou Performance Requirements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140627 | UL RTOA Performance Simulation Resultsm | TruePosition | imported from 3GU |
R4‑140628 | Discussion of MBSFN RSRP and RSRQ Measurement Requirements | Alcatel-Lucent | imported from 3GU |
R4‑140629 | Demodulation tests for intra-band non-contiguous CA with time and power offsets between component carriers | Intel Corporation | imported from 3GU |
R4‑140630 | Discussion of MBSFN RSRP and RSRQ Measurement Requirements | Alcatel-Lucent | imported from 3GU |
R4‑140631 | Discussion of MBSFN MCH BLER Measurement Requirements | Alcatel-Lucent | imported from 3GU |
R4‑140632 | Correction on DL CoMP static CQI tests (Rel 11) | Intel Corporation | imported from 3GU |
R4‑140633 | Correction on DL CoMP static CQI tests (Rel 12) | Intel Corporation | imported from 3GU |
R4‑140634 | Further Discussion of Valid CQI Reporting in SCell Activation | Alcatel-Lucent | imported from 3GU |
R4‑140635 | Valid CQI Reporting in SCell Activation (Rel-10) | Alcatel-Lucent | imported from 3GU |
R4‑140636 | Valid CQI Reporting in SCell Activation (Rel-11) | Alcatel-Lucent | imported from 3GU |
R4‑140637 | Usability of UL SF after measurement gap for Rel.12 | NSN, Nokia Corporation | imported from 3GU |
R4‑140638 | UE behavior after Measurement Gap (CR for rel.12) | NSN, Nokia Corporation | imported from 3GU |
R4‑140639 | Valid CQI Reporting in SCell Activation (Rel-12) | Alcatel-Lucent | imported from 3GU |
R4‑140640 | Considerations on PCell interruption due to UE measurement | NSN, Nokia Corporation | imported from 3GU |
R4‑140641 | Performance Relevant Analysis for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | imported from 3GU |
R4‑140642 | UE observed Power Imbalance and Time offset for Non-collocated Intra-band NC CA | NSN, Nokia Corporation | imported from 3GU |
R4‑140643 | Further discussion on relaxed performance requirement for HetNet | Alcatel-Lucent | imported from 3GU |
R4‑140644 | Consideration on UE performance for intra-band NC CA | NSN, Nokia Corporation | imported from 3GU |
R4‑140645 | Considerations on BS requirements for 256QAM | NSN, Nokia Corporation | imported from 3GU |
R4‑140646 | Feasibility Evaluation on UL power control for eIMTA TDD system | NSN, Nokia Corporation | imported from 3GU |
R4‑140647 | OTDOA Positioning: RRH with PCI identical to the associated Macro cell | Alcatel-Lucent | imported from 3GU |
R4‑140648 | On receiver complexity with and without network assistance | MediaTek Inc. | imported from 3GU |
R4‑140649 | Performance of partially blind R-ML receivers in TM8/9 | MediaTek Inc. | imported from 3GU |
R4‑140650 | Performance of partially blind R-ML receivers in TM4/6 (2-Tx) | MediaTek Inc. | imported from 3GU |
R4‑140651 | Base Station Co-Existence Spurious Emission Protection for 2 GHz MSS Band | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑140652 | Band Plan Proposal for 2 GHz MSS Band | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑140653 | Harmonics and intermodulation products analysis supporting LTE-A CA of Band 1 and Band 3 | China Unicom, China Telecom, NSN, Nokia, KT, Huawe | imported from 3GU |
R4‑140654 | Protection Level for 2 GHz MSS Band and Band 34 UE Co-Existence | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑140655 | Simualtion results of RSRP measurement accuracy for different TDD configurations for CA | Samsung | imported from 3GU |
R4‑140656 | View on the defining relaxed cell detection requirements using existing gap pattern | Samsung | imported from 3GU |
R4‑140657 | CR to finalize fading CQI test for CoMP_R11 | Huawei, HiSilicon | imported from 3GU |
R4‑140658 | CR to finalize fading CQI test for CoMP_R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140659 | CR to finalize RI test for CoMP_R11 | Huawei, HiSilicon | imported from 3GU |
R4‑140660 | CR to finalize RI test for CoMP_R12 | Huawei, HiSilicon | imported from 3GU |
R4‑140661 | Summary of CoMP CSI results (TDD) | Huawei, HiSilicon | imported from 3GU |
R4‑140662 | Text Proposal on Coexistence Studies of Harmonics and intermodulation products analysis supporting LTE-A CA of Band 1 and Band 3 | China Unicom | imported from 3GU |
R4‑140663 | TRP and TRS proposal for bands I, II, V and VIII in besides the head and hand | Nokia Corporation | imported from 3GU |
R4‑140664 | Hand phantom effect in UTRA OTA | Nokia Corporation | imported from 3GU |
R4‑140665 | AAS Conductive Requirement for Output Power | KDDI | imported from 3GU |
R4‑140666 | Text Proposal on Coexistence Studies of Harmonics and intermodulation products analysis supporting LTE-A CA of Band 1 and Band 3 | China Unicom, China Telecom, NSN, Nokia, KT, Huawe | imported from 3GU |
R4‑140667 | Harmonics and intermodulation products analysis supporting LTE-A CA of Band 1 and Band 3 | China Unicom, China Telecom, NSN, Nokia, KT, Huawe | imported from 3GU |
R4‑140668 | UTRA besides the hand and head delta between TRP average and min requirement | Nokia Corporation | imported from 3GU |
R4‑140669 | TP for tablet testing TR 25.914 | Nokia Corporation, Sony Mobile | imported from 3GU |
R4‑140670 | TR36.833-4 v0.3.0 | Nokia Corporation | imported from 3GU |
R4‑140671 | CA features and release independence | Nokia Corporation | imported from 3GU |
R4‑140672 | Receiver requirements for 2UL inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140673 | Pcmax for UL-MIMO and 2UL inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140674 | FDD-TDD CA example band combination | Nokia Corporation | imported from 3GU |
R4‑140675 | UE Transmit Timing Accuracy requirements in DRX and corresponding Test Cases | Fujitsu | imported from 3GU |
R4‑140676 | UE Transmit Timing Accuracy Requirements in first transmission in a DRX cycle | Fujitsu | imported from 3GU |
R4‑140677 | Test Cases for UE Transmit Timing Accuracy requirements in DRX | Fujitsu | imported from 3GU |
R4‑140678 | B42/B43 co-existence | NTT DOCOMO, INC. | imported from 3GU |
R4‑140679 | D2D AGC settling time | Broadcom Corporation | imported from 3GU |
R4‑140680 | D2D AGC settling time | Broadcom Corporation | imported from 3GU |
R4‑140681 | Revised WI: LTE Advanced intra-band non-contiguous CA framework for 2UL | Nokia Corporation | imported from 3GU |
R4‑140682 | Discussion on MPR table for 2UL intra-band NC CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑140683 | MTC TX-RX and RX-TX switching time | Broadcom Corporation | imported from 3GU |
R4‑140684 | CR on dRIB for receiver requirements(Rel-10) | NTT DOCOMO, INC. | imported from 3GU |
R4‑140685 | CR on dRIB for receiver requirements(Rel-11) | NTT DOCOMO, INC. | imported from 3GU |
R4‑140686 | CR on dRIB for receiver requirements(Rel-12) | NTT DOCOMO, INC. | imported from 3GU |
R4‑140687 | Configured transmitted power for CA | Broadcom Corporation | imported from 3GU |
R4‑140688 | Configured transmitted power for CA | Broadcom Corporation | imported from 3GU |
R4‑140689 | TRP / TRS test results for UMTS and LTE | NTT DOCOMO | imported from 3GU |
R4‑140690 | Simulation results for RSRP and RSRQ measurement under high Doppler condition | Fujitsu | imported from 3GU |
R4‑140691 | Configured transmitted power for CA | Broadcom Corporation | imported from 3GU |
R4‑140692 | TX and RX relaxations for dual uplink inter-band CA class A5 | Broadcom Corporation | imported from 3GU |
R4‑140693 | Modifications to intra-band contiguous CA class B receiver requirements | Broadcom Corporation | imported from 3GU |
R4‑140694 | Modifications to intra-band contiguous CA class B receiver requirements | Broadcom Corporation | imported from 3GU |
R4‑140695 | Channel spacing for intra-band non-contiguous CA | Broadcom Corporation | imported from 3GU |
R4‑140696 | Channel spacing for intra-band non-contiguous CA | Broadcom Corporation | imported from 3GU |
R4‑140697 | On the usage of CRS-IC for CoMP. | Ericsson | imported from 3GU |
R4‑140698 | Pcmax for dual UL interband CA | Nokia Corporation, Interdigital | imported from 3GU |
R4‑140699 | CSI test metric of PUSCH Mode 3-2 | Ericsson | imported from 3GU |
R4‑140700 | Work plan for LTE TDD-FDD joint operation including Carrier Aggregation | Nokia Corporation, NSN | imported from 3GU |
R4‑140701 | Alternative for MSD in dual uplink CA | Broadcom Corporation | imported from 3GU |
R4‑140702 | PUCCH mode Selection of CSI test for Further downlink MIMO enhancement | Ericsson | imported from 3GU |
R4‑140703 | Inter-frequency Measurements with eIMTA | Qualcomm Incorporated | imported from 3GU |
R4‑140704 | Non-contiguous intraband Band CA REFSENS | Nokia Corporation | imported from 3GU |
R4‑140705 | Dual uplink inter-band CA intermodulation | Broadcom Corporation | imported from 3GU |
R4‑140706 | Simulation assumption for CSI performance requirements for Further downlink MIMO enhancement | Ericsson | imported from 3GU |
R4‑140707 | Correction of Proximity Indication Test Case | Qualcomm Incorporated | imported from 3GU |
R4‑140708 | Correction of Proximity Indication Test Case | Qualcomm Incorporated | imported from 3GU |
R4‑140709 | Proposal For New Device Types to be implemented in TR 25.914 and in TS 37.144 | Sporton International Inc. | imported from 3GU |
R4‑140710 | Inter-frequency measurement without CM for MC-HSPA test case | Ericsson | imported from 3GU |
R4‑140711 | Test case on inter-frequency measurements and packet loss rate requirements | Ericsson | imported from 3GU |
R4‑140712 | Correction of Proximity Indication Test Case | Qualcomm Incorporated | imported from 3GU |
R4‑140713 | Correction of Proximity Indication Test Case | Qualcomm Incorporated | imported from 3GU |
R4‑140714 | Correction in Annex B.3.X of TS 25.133 | Ericsson | imported from 3GU |
R4‑140715 | Correction in Annex B.3.X of TS 25.133 | Ericsson | imported from 3GU |
R4‑140716 | Clarification of contiguous and non-contiguous intra-band UE capabilities in the same band | Ericsson | imported from 3GU |
R4‑140717 | TP for TR 36.860 Spurious emissions for uplink inter-band CA | Ericsson | imported from 3GU |
R4‑140718 | Clarification of contiguous and non-contiguous intra-band UE capabilities in the same band | Ericsson | imported from 3GU |
R4‑140719 | Modification of tables in section 9 | Ericsson | imported from 3GU |
R4‑140720 | Channel spacing for non-contiguous intra-band carrier aggregation | Ericsson | imported from 3GU |
R4‑140721 | TP for TR 36.833-5-41: nominal guard band for Class D | Ericsson, Sprint | imported from 3GU |
R4‑140722 | Channel spacing for non-contiguous intra-band carrier aggregation | Ericsson | imported from 3GU |
R4‑140723 | 2UL interband CA Rx tests | Nokia Corporation | imported from 3GU |
R4‑140724 | Packet loss rate for SCell measurement below 640 ms | Ericsson | imported from 3GU |
R4‑140725 | Editorial corrections on TR 36.833-2-07 | Ericsson | imported from 3GU |
R4‑140726 | TP for TR 36.833-5-41: nominal channel spacing for Class D | Ericsson, Sprint | imported from 3GU |
R4‑140727 | CSI Reporting in SCell Activation Requirements | Ericsson | imported from 3GU |
R4‑140728 | MPR versioning | Nokia Corporation | imported from 3GU |
R4‑140729 | CSI Reporting in SCell Activation Requirements | Ericsson, Intel, Alcatel-Lucent, Qualcomm, NTT DoCoMo, Samsung, Motorola Mobility, MediaTek, Huawei, HiSilicon | imported from 3GU |
R4‑140730 | CSI Reporting in SCell Activation Requirements | Ericsson, Intel, Alcatel-Lucent, Qualcomm, NTT DoCoMo, Samsung, Motorola Mobility, MediaTek, Huawei, HiSilicon | imported from 3GU |
R4‑140731 | RSRQ System Simulation Results with RSSI Measurements in all Symbols | Ericsson | imported from 3GU |
R4‑140732 | TP for TR 36.853: Addition of 3DL configurations and bandwidth combinations | Ericsson | imported from 3GU |
R4‑140733 | On the 3DL combinations and 2DL fallback modes | Ericsson | imported from 3GU |
R4‑140734 | OCNG patterns for 3 MHz channel bandwith | Ericsson | imported from 3GU |
R4‑140735 | Correction of coding rate for 18RBs in UL RMC table | Anritsu | imported from 3GU |
R4‑140736 | Reference measurement channels for 3 MHz channel bandwith | Ericsson | imported from 3GU |
R4‑140737 | UE Behaviour for Transmission due to Measurement Gaps | Ericsson | imported from 3GU |
R4‑140738 | Correction of coding rate for 18RBs in UL RMC table | Anritsu | imported from 3GU |
R4‑140739 | UE-UE co-existence | Ericsson | imported from 3GU |
R4‑140740 | Correction of coding rate for 18RBs in UL RMC table | Anritsu | imported from 3GU |
R4‑140741 | Correction on UE Behaviour for Transmission due to Measurement Gaps | Ericsson | imported from 3GU |
R4‑140742 | Feasibility of NCL extension for UTRA | NSN | imported from 3GU |
R4‑140743 | Impact on RRM requirements in 3 DL CA | Ericsson | imported from 3GU |
R4‑140744 | Band 26 and the applicable release for NS modifications | Ericsson, SouthernLINC, Sprint | imported from 3GU |
R4‑140745 | Scope of MTC work | Ericsson | imported from 3GU |
R4‑140746 | Impact of Low Cost MTC on RRM requirements | Ericsson | imported from 3GU |
R4‑140747 | Impact of 1 Rx UE on RLM requirements | Ericsson | imported from 3GU |
R4‑140748 | NS_12 and NS_13 modifications | Ericsson, SouthernLINC, Sprint | imported from 3GU |
R4‑140749 | CR on B42/B43 co-existence(Rel-10) | NTT DOCOMO, INC. | imported from 3GU |
R4‑140750 | CR on B42/B43 co-existence(Rel-11) | NTT DOCOMO, INC. | imported from 3GU |
R4‑140751 | NS_12 and NS_13 modifications | Ericsson, SouthernLINC, Sprint | imported from 3GU |
R4‑140752 | CR on B42/B43 co-existence(Rel-12) | NTT DOCOMO, INC. | imported from 3GU |
R4‑140753 | Spectral density for unequal DL CC RB allocations in ACS | Anritsu | imported from 3GU |
R4‑140754 | Discussion on Release-12 UE receiver enhancements | NVIDIA | imported from 3GU |
R4‑140755 | Draft reply LS on feasibility of NCL extension for UTRA | NSN | imported from 3GU |
R4‑140756 | On blind estimation of interferer parameters | NVIDIA | imported from 3GU |
R4‑140757 | A-MPR for MSS and B34 coexistence | Nokia Corporation | imported from 3GU |
R4‑140758 | CA_2A-2A Reference Sensitivity | Nokia Corporation | imported from 3GU |
R4‑140759 | CA_39C A-MPR | Nokia Corporation | imported from 3GU |
R4‑140760 | The SEM and OOBE for the L-band in Region 1 | Ericsson | imported from 3GU |
R4‑140761 | Relaxed Measurements for Inter-frequency Cell Search | BROADCOM CORPORATION | imported from 3GU |
R4‑140762 | 2UL interband CA: Own Rx desensitization | Nokia Corporation | imported from 3GU |
R4‑140763 | Discussion on the open issues for NAICS receiver | BROADCOM CORPORATION | imported from 3GU |
R4‑140764 | TP for TR 37.814: The 3GPP BS unwanted emissions | Ericsson | imported from 3GU |
R4‑140765 | Proposal to tightening the accuracy of the transmit power | Kathrein | imported from 3GU |
R4‑140766 | Discussion on interruptions in measurement without gaps | NTT DOCOMO | imported from 3GU |
R4‑140767 | Discussion on interruptions in measurement without gaps | NTT DOCOMO | imported from 3GU |
R4‑140768 | Discussion on relaxed measurements in HetNet Mobility | NTT DOCOMO | imported from 3GU |
R4‑140769 | eIMTA coexistence simulation results | Ericsson | imported from 3GU |
R4‑140770 | Generic versus Band Specific Requirements for MTC UEs - prioritized bands | Ericsson | imported from 3GU |
R4‑140771 | RRM requirements for dynamic TDD | Ericsson | imported from 3GU |
R4‑140772 | TP for TR 37.814: Co-existence with other 3GPP bands in Region 1 and Japan | Ericsson | imported from 3GU |
R4‑140773 | RF Requirements for Single Rx and HD-FDD MTC UE | Ericsson | imported from 3GU |
R4‑140774 | CR on RRM requirements for dynamic TDD | Ericsson | imported from 3GU |
R4‑140775 | TP for TR 37.814: Background update | Ericsson | imported from 3GU |
R4‑140776 | HD-FDD Switching Time for Low Cost MTC UE | Ericsson | imported from 3GU |
R4‑140777 | Way forward on high Doppler RRM | NTT DOCOMO | imported from 3GU |
R4‑140778 | Overview of test cases needed for inter-band CA | Ericsson | imported from 3GU |
R4‑140779 | Specification structure for 25.101 | Ericsson | imported from 3GU |
R4‑140780 | Draft Reply LS on Half duplex FDD operation for Low complexity MTC UE | Ericsson | imported from 3GU |
R4‑140781 | Simulation Assumptions for Inter-frequency RRM requirements for TDD configuration 0 | Ericsson | imported from 3GU |
R4‑140782 | Simulation results for Inter-frequency RRM requirements for TDD configuration 0 | Ericsson | imported from 3GU |
R4‑140783 | Impact of Reduced TBS and Non-contiguous RBs on Low cost MTC UEs | Ericsson | imported from 3GU |
R4‑140784 | TP to TR37.814: In-band-blocking and IM for DB-DC-HSDPA and dual band 4C-HSDPA for Band I + L-band | Ericsson | imported from 3GU |
R4‑140785 | Impact of 256 QAM on RF core requirements for BS | Ericsson | imported from 3GU |
R4‑140786 | Modified test configuration for verification of power control for intra-band contiguous CA | Ericsson | imported from 3GU |
R4‑140787 | E-UTRA hand phantomn TRP/TRS data | Nokia Corporation | imported from 3GU |
R4‑140788 | Impact of 256 QAM on RF core requirements for BS | Ericsson | imported from 3GU |
R4‑140789 | Prioritization of Scenarios for Studying UE-to-UE Co-existence in D2D | Ericsson | imported from 3GU |
R4‑140790 | Impact of 256 QAM on RF core requirements for UE | Ericsson | imported from 3GU |
R4‑140791 | Overview of RRM requirements for low-cost MTC | Ericsson | imported from 3GU |
R4‑140792 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson | imported from 3GU |
R4‑140793 | TP for TR 37.814: L-band UE REFSENS | Ericsson | imported from 3GU |
R4‑140794 | Preliminary D2D Co-existence Simulation Results | Ericsson | imported from 3GU |
R4‑140795 | Link simulation assumptions for cell identification for low-cost MTC with 1 Rx | Ericsson | imported from 3GU |
R4‑140796 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson | imported from 3GU |
R4‑140797 | General overview of solutions for increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | NSN | imported from 3GU |
R4‑140798 | Test case for RACH on SCell | Ericsson | imported from 3GU |
R4‑140799 | On EARFCN extension in GERAN | Broadcom Corporation, BlackBerry Ltd | imported from 3GU |
R4‑140800 | Way Forward on Prioritization of Scenarios for Studying D2D UE-to-UE Co-existence | Ericsson | imported from 3GU |
R4‑140801 | Discussion on RRM requirement for 3DL CA | CATT | imported from 3GU |
R4‑140802 | Link simulation assumptions for RSRP RSRQ for low-cost MTC with 1 Rx | Ericsson | imported from 3GU |
R4‑140803 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson | imported from 3GU |
R4‑140804 | CR 36.104-0423 rev 2: Definition of EARFCN to support additional carrier frequencies in GERAN | Broadcom Corporation, BlackBerry Ltd | imported from 3GU |
R4‑140805 | AGC Settling Time and Receiver Dynamic Range in D2D UEs | Ericsson | imported from 3GU |
R4‑140806 | Missing condition in CGI identification requirements | Ericsson | imported from 3GU |
R4‑140807 | Missing condition in CGI identification requirements | Ericsson | imported from 3GU |
R4‑140808 | Initial frequency Offsets in UEs for D2D only mode | Ericsson | imported from 3GU |
R4‑140809 | UE Timing Advance Adjustment Accuracy Test for SCell | Ericsson | imported from 3GU |
R4‑140810 | Feasibility study for TDD eIMTA | CATT | imported from 3GU |
R4‑140811 | TR 37.814: L-band for Supplemental Downlink in E-UTRA and UTRA | Ericsson, Orange | imported from 3GU |
R4‑140812 | AAS MCL considerations | NSN | imported from 3GU |
R4‑140813 | Modifying allowed UE power back-off in open- and earlier releases | Ericsson | imported from 3GU |
R4‑140814 | Draft Reply LS on AGC, Dynamic Range and Frequency Offset | Ericsson | imported from 3GU |
R4‑140815 | Missing condition in CGI identification requirements | Ericsson | imported from 3GU |
R4‑140816 | AAS Time Alignment Error | NSN | imported from 3GU |
R4‑140817 | Low Cost MTC RX Characteristics | Intel | imported from 3GU |
R4‑140818 | Further NAICS SLIC Results | Nokia Corporation, NSN | imported from 3GU |
R4‑140819 | AAS beam declaration for the EIRP accuracy requirement | NSN | imported from 3GU |
R4‑140820 | Range of interferer frequency offset for in-gap requirements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑140821 | Text Proposal for the TR for Low Cost MTC RX Characteristics | Intel | imported from 3GU |
R4‑140822 | AAS test system uncertainty analysis | NSN | imported from 3GU |
R4‑140823 | Missing condition in CGI identification requirements | Ericsson | imported from 3GU |
R4‑140824 | BS RF core requirements update for CA TDD-FDD | Ericsson | imported from 3GU |
R4‑140825 | Initial RSRP simulation results for TDD UL/DL configuration 0 | CATT | imported from 3GU |
R4‑140826 | CR on clarification of interfering signals for non-contiguous spectrum operation (TS 37.104 Rel-10) | Ericsson | imported from 3GU |
R4‑140827 | AAS conducted rx sensitivity requirement | NSN | imported from 3GU |
R4‑140828 | Clarification of interfering signals for receiver intermodulation requirement in MSR | Ericsson | imported from 3GU |
R4‑140829 | AAS OTA rx sensitivity requirement | NSN | imported from 3GU |
R4‑140830 | Applicability of in-gap and out-of-gap requirements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑140831 | BS RF core requirements for CA TDD-FDD | Ericsson | imported from 3GU |
R4‑140832 | Introduction of test requirements for multi-band operation with conformance test improvement for multi-carrier testing (36.141, section 6 and 7) | NSN, Alcatel-Lucent, CATT, Ericsson, Huawei, ZTE | imported from 3GU |
R4‑140833 | Clarification of interfering signals for receiver intermodulation requirement in MSR | Ericsson | imported from 3GU |
R4‑140834 | Considerations for AAS EIRP accuracy declaration | NSN | imported from 3GU |
R4‑140835 | CR on clarification of interfering signals for non-contiguous spectrum operation (TS 37.141 Rel-10) | Ericsson | imported from 3GU |
R4‑140836 | Multi-band corrections in 37.141 chapter 6 | Ericsson | imported from 3GU |
R4‑140837 | Treatment of tapering in AAS conducted transmitter tests | NSN | imported from 3GU |
R4‑140838 | Clarification of interfering signals for receiver intermodulation requirement in MSR | Ericsson | imported from 3GU |
R4‑140839 | AAS conducted tx power requirement | NSN | imported from 3GU |
R4‑140840 | Clarification of interfering signals for receiver intermodulation requirement in MSR | Ericsson | imported from 3GU |
R4‑140841 | Multi-band corrections in 37.141 chapter 6 | Ericsson | imported from 3GU |
R4‑140842 | Introduction of test requirements for multi-band operation with conformance test improvement for multi-carrier testing (36.141, section 6 and 7) | NSN, Alcatel-Lucent, CATT, Ericsson, Huawei, ZTE | imported from 3GU |
R4‑140843 | TR 36.851 V0.9.0: Rel-12 Inter-band Carrier Aggregation | Ericsson | imported from 3GU |
R4‑140844 | Applicability of in-gap and out-of-gap requirements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑140845 | Introducting multi-band conformance testing in TS 36.141 | Ericsson | imported from 3GU |
R4‑140846 | Stronger interferer detection for Naics receivers | Ericsson | imported from 3GU |
R4‑140847 | (Draft) TR 36.833-5-41 V0.2.0 | Sprint, Alcatel-Lucent | imported from 3GU |
R4‑140848 | CW methodology for AAS radiation pattern characterization | NSN | imported from 3GU |
R4‑140849 | The channel arrangement for 2GHz including the MSS band | Ericsson | imported from 3GU |
R4‑140850 | Channel Arrangement for 2GHz MSS band | NSN, Nokia | imported from 3GU |
R4‑140851 | Discussion on RRM requirement for TDD UL/DL configuration 0 | CATT | imported from 3GU |
R4‑140852 | Overview of measurement requirements for eMBMS | Ericsson | imported from 3GU |
R4‑140853 | Methodology for studying OTDOA with RRH | Ericsson | imported from 3GU |
R4‑140854 | TP for TR 36.833-5-41: ACS | Sprint | imported from 3GU |
R4‑140855 | Methodology for studying OTDOA with RRH | Ericsson | imported from 3GU |
R4‑140856 | Co-existence between the MSS spectrum and Band 34 | Ericsson | imported from 3GU |
R4‑140857 | Methodology for studying UE Rx-Tx time difference with RRH | Ericsson | imported from 3GU |
R4‑140858 | Correction of a table note for Pcmax | Ericsson | imported from 3GU |
R4‑140859 | UE RF requirements in release independent specification | Ericsson | imported from 3GU |
R4‑140860 | On performance requirements for NBPS | Ericsson | imported from 3GU |
R4‑140861 | UL power restrictions for Band XXVI and their verification | Ericsson | imported from 3GU |
R4‑140862 | TP for TR 36.833-5-41: Blocking Minimum Requirements | Sprint | imported from 3GU |
R4‑140863 | AAS specification structure | Ericsson | imported from 3GU |
R4‑140864 | On NAICS receiver operation and complexity | Nokia Corporation, NSN | imported from 3GU |
R4‑140865 | Band simplification clean up | Ericsson | imported from 3GU |
R4‑140866 | On the relation between conducted requirements, beams and xx.104 | Ericsson | imported from 3GU |
R4‑140867 | UE RF requirements in release independent specification | Ericsson | imported from 3GU |
R4‑140868 | Band simplification clean up | Ericsson | imported from 3GU |
R4‑140869 | Minimum Coupling Loss: Considerations | Ericsson | imported from 3GU |
R4‑140870 | Discussion on NAICS advanced receiver | Nokia Corporation, NSN | imported from 3GU |
R4‑140871 | TP for TR 36.833-5-41: Out-of-band Blocking | Sprint | imported from 3GU |
R4‑140872 | AAS types and declaration | Ericsson | imported from 3GU |
R4‑140873 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑140874 | On describing radiated requirements in the specification structure | Ericsson | imported from 3GU |
R4‑140875 | Proposals for specific conducted requirements | Ericsson | imported from 3GU |
R4‑140876 | Maximum allowed UL TX power for Band XXVI coexistence with Public Safety | Ericsson | imported from 3GU |
R4‑140877 | Multi-band corrections in 37.141 chapter 7 | Ericsson | imported from 3GU |
R4‑140878 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑140879 | WF for UE co-existence between adjacent/close bands and for unsynchronized TDD operations inside the band | TeliaSonera | imported from 3GU |
R4‑140880 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑140881 | Multi-band corrections in 37.141 chapter 7 | Ericsson | imported from 3GU |
R4‑140882 | On minimum requirement for radiated output power | Ericsson | imported from 3GU |
R4‑140883 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑140884 | UE RF requirements in release independent specification | Ericsson | imported from 3GU |
R4‑140885 | Relaxed performance requirements for background search | Nokia Corporation, NSN | imported from 3GU |
R4‑140886 | Maximum allowed UL TX power for Band XXVI coexistence with Public Safety | Ericsson | imported from 3GU |
R4‑140887 | TP for TR 36.833-5-41: Narrow Band Blocking | Sprint | imported from 3GU |
R4‑140888 | On radiated core RF requirements and conformance testing | Ericsson | imported from 3GU |
R4‑140889 | On BS ACLR and UEM requirements | Ericsson | imported from 3GU |
R4‑140890 | On TDD UL/DL subframe configurations in requirements | Ericsson | imported from 3GU |
R4‑140891 | New WID to add a BW combination set for 2DL/1UL CA B4+B12 | U.S. Cellular | imported from 3GU |
R4‑140892 | TP for TR 36.833-5-41: Spurious Emissions | Sprint | imported from 3GU |
R4‑140893 | On radiated receiver sensitivity | Ericsson | imported from 3GU |
R4‑140894 | Correction of table notes for NS_12-NS_15 spurious emissions requirements | Ericsson | imported from 3GU |
R4‑140895 | Maximum number of carriers for UE to monitor in TS36.133 | Nokia Corporation | imported from 3GU |
R4‑140896 | UE RF requirements in release independent specification | Ericsson | imported from 3GU |
R4‑140897 | TDD UL/DL subframe configurations in requirements | Ericsson | imported from 3GU |
R4‑140898 | TP for TR 36.853: For LTE_CA_B3_B7_B20 BS specific | TeliaSonera AB | imported from 3GU |
R4‑140899 | Beam Declaration for radiated TX power | Ericsson | imported from 3GU |
R4‑140900 | Correction of table notes for NS_12-NS_15 spurious emissions requirements | Ericsson | imported from 3GU |
R4‑140901 | Discussion on MBSFN measurements | Nokia Corporation | imported from 3GU |
R4‑140902 | WID revision for new BW combination set for 2DL/1UL CA B2+B12 | U.S. Cellular | imported from 3GU |
R4‑140903 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 7 | TeliaSonera, Orange, NSN, Deutsche Telekom | imported from 3GU |
R4‑140904 | TP for TR 36.833-5-41: Intermods | Sprint | imported from 3GU |
R4‑140905 | Beam Declaration Requirements | Ericsson | imported from 3GU |
R4‑140906 | UE RF requirements in release independent specification | Ericsson | imported from 3GU |
R4‑140907 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 7 | TeliaSonera AB | imported from 3GU |
R4‑140908 | TP for TR TR 833-1-27: Updates to affected specifications | NII Holdings | imported from 3GU |
R4‑140909 | Time plan for finalization of enhanced carrier aggregation | Nokia Corporation, NSN | imported from 3GU |
R4‑140910 | TP for TR 36.833-5-41: Rx Image | Sprint | imported from 3GU |
R4‑140911 | WID revision for new BW combination set for 3DL/1UL CA B2+B4+B12 | U.S. Cellular | imported from 3GU |
R4‑140912 | Creation of a section in TR 25.914 for Phablet | Sporton International Inc. | imported from 3GU |
R4‑140913 | TP 36.851 v0.9.0: additional bandwidth combination set for CA_2A-4A | Ericsson, T-Mobile | imported from 3GU |
R4‑140914 | UE RF requirements in release independent specification | Ericsson | imported from 3GU |
R4‑140915 | System Level Analysis of a change in RSRQ definition | Nokia Corporation, NSN | imported from 3GU |
R4‑140916 | Updated WID - LTE Advanced intra-band Non-contiguous Carrier Aggregation in Band 41 for 3 DL | Sprint | imported from 3GU |
R4‑140917 | TP MCL Calculation for AAS BS | NEC | imported from 3GU |
R4‑140918 | New WI Proposal: Enhanced requirement for Downlink CoMP | Samsung | imported from 3GU |
R4‑140919 | Inrtroduction of additional bandwidth combination set for CA_2A-4A | Ericsson, T-Mobile | imported from 3GU |
R4‑140920 | Updated FeICIC PBCH Simulation results | CATT | imported from 3GU |
R4‑140921 | TP for 36.860: RF RX requirements for uplink inter-band CA | Ericsson | imported from 3GU |
R4‑140922 | TP Declaration of Beams and Maximum EIRP | NEC | imported from 3GU |
R4‑140923 | Simulation Results for SNR Estimation for TM9 (TDD) | CATT | imported from 3GU |
R4‑140924 | Clarification concerning measurement gap for UE with single chip implementation | Nokia Corporation, NSN | imported from 3GU |
R4‑140925 | TP on Conducted Output power Requirements for AAS BS | NEC | imported from 3GU |
R4‑140926 | On transmitter performance requirements for uplink intra-band NC CA | Ericsson | imported from 3GU |
R4‑140927 | Clarification concerning measurement gap for UE with single chip implementation | Nokia Corporation, NSN | imported from 3GU |
R4‑140928 | Correction of abbreviations for negative acknowledgement | CATT | imported from 3GU |
R4‑140929 | Transmitter requirements for 3DL/1UL FDD following the agreed way forward | Ericsson | imported from 3GU |
R4‑140930 | Clarification concerning measurement gap for UE with single chip implementation | Nokia Corporation, NSN | imported from 3GU |
R4‑140931 | Revised WID: LTE Advanced inter-band Carrier Aggregation of Band 4 and Band 27 | NII Holdings | imported from 3GU |
R4‑140932 | Correction of abbreviations for negative acknowledgement | CATT | imported from 3GU |
R4‑140933 | Conducted Sensitivity Requirements for AAS BS | NEC | imported from 3GU |
R4‑140934 | RF RX requirements for combinations of intra-band contiguous and inter-band CA for FDD | Ericsson | imported from 3GU |
R4‑140935 | Transmitter Intermodulation Requirement for AAS BS | NEC | imported from 3GU |
R4‑140936 | Correction of abbreviations for negative acknowledgement | CATT | imported from 3GU |
R4‑140937 | Time Alignment Error Requirements for AAS BS | NEC | imported from 3GU |
R4‑140938 | Correction of abbreviations for negative acknowledgement | CATT, CATR | imported from 3GU |
R4‑140939 | CA bandwidth combination set and backward support | Telecom Italia, CMCC, Deutsche Telekom and Orange | imported from 3GU |
R4‑140940 | Error Vector Magnitude Requirements for AAS BS | NEC | imported from 3GU |
R4‑140941 | Correction of abbreviations for negative acknowledgement | CATT, CATR | imported from 3GU |
R4‑140942 | Operating band Unwanted Emission Requirement for AAS BS | NEC | imported from 3GU |
R4‑140943 | Consideration on Radiated Transmit Power accuracy requirements | NEC | imported from 3GU |
R4‑140944 | UTRA TRP and TRS measurements for bands I and VIII with head+hands test setup | Telecom Italia | imported from 3GU |
R4‑140945 | EPDDCH WI Perf Requirement Completion | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140946 | Correction of abbreviations for negative acknowledgement | CATT, CATR | imported from 3GU |
R4‑140947 | Signals for requirements and testing | Ericsson | imported from 3GU |
R4‑140948 | Distributed EPDCCH Demodulation Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140949 | Text Proposal TS 36.112 Section 4 | TruePosition | imported from 3GU |
R4‑140950 | Text Proposal for TS 36.112 Annex G | TruePosition | imported from 3GU |
R4‑140951 | Distributed EPDCCH Demodulation Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140952 | Localized EPDCCH Demodulation Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140953 | Harmonics and Intermod analysis for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | imported from 3GU |
R4‑140954 | Localized EPDCCH Demodulation Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140955 | TP for TR 36.851: Harmonics and Intermod analysis for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | imported from 3GU |
R4‑140956 | Reference Measurement Channels for EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140957 | Reference Measurement Channels for EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑140958 | Required changes to specify the additional bandwidth combinations for CA_7C | ORANGE | imported from 3GU |
R4‑140959 | L-Band BS unwanted emissions in Region 1 | ORANGE | imported from 3GU |
R4‑140960 | eDL-MIMO R12 Core Requirements and Work Plan | Alcatel-Lucent | imported from 3GU |
R4‑140961 | DeltaTIB and DeltaRIB values for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | imported from 3GU |
R4‑140962 | Finalization of CM/MPR for DC-HSUPA with 16QAM | Qualcomm Incorporated | imported from 3GU |
R4‑140963 | Way Forward Minimal channel spacing for carrier aggregation | Sprint | imported from 3GU |
R4‑140964 | New Work Item proposal: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 7 and Band 7 | ORANGE, Deutsche Telekom | imported from 3GU |
R4‑140965 | Multiple Access Scheme for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑140966 | Small cell AAS BS systems deployments | NEC | imported from 3GU |
R4‑140967 | New Work Item proposal: LTE Advanced inter-band Carrier Aggregation of Band 7 and Band 22 | ORANGE | imported from 3GU |
R4‑140968 | Impact on requirements due to NCL extension | Qualcomm Incorporated | imported from 3GU |
R4‑140969 | Reply LS on Multiple Access Scheme for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑140970 | TP for TR 36.851: DeltaTIB and DeltaRIB values for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | imported from 3GU |
R4‑140971 | 1+3 consistency check and CBW additions | Vodafone | imported from 3GU |
R4‑140972 | Proposal to stop LTE_CA_NC_B41-Core/Perf WID | Sprint | imported from 3GU |
R4‑140973 | AGC and Frequency Error for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑140974 | Reply LS on increasing the size of neighbour cell list | Qualcomm Incorporated | imported from 3GU |
R4‑140975 | Measurement requirement proposals to monitor additional UTRA carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑140976 | Reply LS on AGC and Frequency Error for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑140977 | Measurement requirement proposals to monitor additional UTRA carriers in CELL_FACH state | Qualcomm Incorporated | imported from 3GU |
R4‑140978 | D2D coexistence with co-channel and adjacent channel services | Qualcomm Incorporated | imported from 3GU |
R4‑140979 | Measurement requirement proposals to monitor additional UTRA carriers in CELL_DCH state | Qualcomm Incorporated | imported from 3GU |
R4‑140980 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated | imported from 3GU |
R4‑140981 | 1+5 and 1+7 consistency check and CBW addition | Vodafone | imported from 3GU |
R4‑140982 | UE CSI Test Coverage | Alcatel-Lucent | imported from 3GU |
R4‑140983 | Rx filter insertion loss for UTRA L-band 1452 1496 MHz and reference sensitivity for UTRA | Qualcomm Incorporated | imported from 3GU |
R4‑140984 | UE CSI Test Coverage | Alcatel-Lucent | imported from 3GU |
R4‑140985 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated | imported from 3GU |
R4‑140986 | 1+7 relaxations proposal | Vodafone | imported from 3GU |
R4‑140987 | Blocking performance for UTRA Band I + SDL 1452 1496 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑140988 | Discussion on the harmonic relations for Band 7 and 8 and classification of DL combination and proposal on relaxations | Vodafone | imported from 3GU |
R4‑140989 | Introduction of UE RF core requirements for UTRA Band I + SDL 1452 - 1496 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑140990 | 2DL support when 3DL CA is implemented | Vodafone | imported from 3GU |
R4‑140991 | Discussion on the harmonic relations for Band 7 and 8 and classification of DL combination and proposal on relaxations | Vodafone | imported from 3GU |
R4‑140992 | Low Cost MTC in LTE Band priorities for RAN4 specification | Vodafone | imported from 3GU |
R4‑140993 | AAS Beam Requirements | Alcatel-Lucent | imported from 3GU |
R4‑140994 | TR 36.844 v1.1.0 on Study on Expansion of LTE_FDD_1670_US to include 1670-1680MHz Band for LTE in the US [FS_LTE_FDD_1670_US] | LightSquared Inc. | imported from 3GU |
R4‑140995 | Conducted requirements | Alcatel-Lucent | imported from 3GU |
R4‑140996 | AAS BS Classification | Alcatel-Lucent | imported from 3GU |
R4‑140997 | Clarifications to Channel Model Validation in TR 37.977 Clause 8 | Anite Telecoms Ltd | imported from 3GU |
R4‑140998 | Discussion on Decoupling UL and DL CA bandwidth classes | Sprint | imported from 3GU |
R4‑140999 | AAS Specifications | Verizon Wireless, Alcatel-Lucent | imported from 3GU |
R4‑141000 | Draft TS 36.112 v0.2.0 | TruePosition | imported from 3GU |
R4‑141001 | TDD UL/DL subframe configurations in requirements | Ericsson | imported from 3GU |
R4‑141002 | Correction to release independent specification | Ericsson | imported from 3GU |
R4‑141003 | Correction to release independent specification | Ericsson | imported from 3GU |
R4‑141004 | Correction to release independent specification | Ericsson | imported from 3GU |
R4‑141005 | Correction to release independent specification | Ericsson | imported from 3GU |
R4‑141006 | Correction to release independent specification | Ericsson | imported from 3GU |
R4‑141007 | Test case corrections for eICIC | Ericsson, Intel | imported from 3GU |
R4‑141008 | Test case corrections for eICIC | Ericsson, Intel | imported from 3GU |
R4‑141009 | Test case corrections for eICIC | Ericsson, Intel | imported from 3GU |
R4‑141010 | Editorial corrections RRM from Rel-10 | Ericsson | imported from 3GU |
R4‑141011 | Editorial corrections RRM from Rel-10 | Ericsson | imported from 3GU |
R4‑141012 | Editorial corrections RRM from Rel-10 | Ericsson | imported from 3GU |
R4‑141013 | Editorial corrections RRM from Rel-11 | Ericsson | imported from 3GU |
R4‑141014 | Editorial corrections RRM from Rel-11 | Ericsson | imported from 3GU |
R4‑141015 | Different BWs for UE Rx-Tx time difference | Ericsson | imported from 3GU |
R4‑141016 | Different BWs for UE Rx-Tx time difference | Ericsson | imported from 3GU |
R4‑141017 | Alignment between interruption requirements for RSTD and mobillity measurements for SCell | Ericsson | imported from 3GU |
R4‑141018 | Alignment between interruption requirements for RSTD and mobillity measurements for SCell | Ericsson | imported from 3GU |
R4‑141019 | Alignment between interruption requirements for RSTD and mobillity measurements for SCell | Ericsson | imported from 3GU |
R4‑141020 | Justification of separating tablet and LEE performance requirements | Intel Corporation | imported from 3GU |
R4‑141021 | CR to TR37.902 on separating tablets from the LEE device definition | Intel Corporation | imported from 3GU |
R4‑141022 | MPR for Contiguous CA with Non-Contiguous Resource Allocations and Unequal CC Bandwidths | Motorola Mobility | imported from 3GU |
R4‑141023 | UE Self Overload for FS_LTE_FDD_1670_US [FS_LTE_FDD_1670_US] | LightSquared Inc. | imported from 3GU |
R4‑141024 | CR to TS37.144 on adding tables of performance requirements for tablet devices | Intel Corporation | imported from 3GU |
R4‑141025 | UE Co-existence Requirement for FS_LTE_FDD_1670_US [FS_LTE_FDD_1670_US] | LightSquared Inc. | imported from 3GU |
R4‑141026 | MPR for 2UL intra-band NC CA | Ericsson | imported from 3GU |
R4‑141027 | A-MPR Simulation Results for NS_12 | Motorola Mobility | imported from 3GU |
R4‑141028 | Overview on small cell enhancement and analysis of potential influence to RAN4 | ZTE, Tejet | imported from 3GU |
R4‑141029 | New WI proposal: Additional bandwidth combinations for LTE Advanced inter-band | AT&T | - |
R4‑141030 | TR 36.853: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | AT&T | - |
R4‑141031 | Reply LS on ER-GSM study in GERAN (GP-131110 Source: TSG GERAN WG1, To: ECC PT1, Cc: TSG RAN WG4,ETSI TC RT,ETSI MSG) | TSG GERAN WG1 | - |
R4‑141032 | Reply LS on MB-MSR (GP-131127 Source: TSG GERAN WG1, To: TSG RAN,TSG RAN WG4, Cc: ) | TSG GERAN WG1 | - |
R4‑141033 | LS on further MBMS operations support for E-UTRAN (R1-135919 Source: TSG RAN WG1 [Qualcomm Incorporated], To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 [Qualcomm Incorporated] | - |
R4‑141034 | 3GPP internal LS on update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 | TSG RAN WG1 | - |
R4‑141035 | LS on introduction of LTE coverage enhancement (R1-136065 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑141036 | LS on introduction of TS 25.327 (R2-134531 Source: TSG RAN WG2, To: TSG RAN, Cc: TSG RAN WG4) | TSG RAN WG2 | - |
R4‑141037 | Response LS on GCSE with eMBMS (R2-134594 Source: TSG RAN WG2, To: TSG SA WG2, Cc: TSG RAN WG1,TSG RAN WG3,TSG RAN WG4) | TSG RAN WG2 | - |
R4‑141038 | Reply LS on mobility support for Low Complexity MTC UEs and MTC coverage enhancement (R2-134596 Source: TSG RAN WG2, To: TSG RAN WG1, Cc: TSG RAN WG4) | TSG RAN WG2 | - |
R4‑141039 | LS to RAN4 on the applicability of HPUE for release 8/9/10 devices (R5-134960 Source: TSG RAN WG5, To: TSG RAN WG4, Cc: N/A) | TSG RAN WG5 | - |
R4‑141040 | Text proposal for working document towards a preliminary draft new Recommendation ITU-R M.IMT.OOBE MS (R5-134994 Source: TSG RAN WG5, To: TSG RAN, Cc: TSG RAN WG4,ITUR Adhoc) | TSG RAN WG5 | - |
R4‑141041 | LS on ProSe Out of Coverage discovery (S2-140560 Source: TSG SA WG2, To: TSG RAN,TSG RAN WG1,TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: TSG SA) | TSG SA WG2 | - |
R4‑141042 | LS on ER-GSM study in GERAN (SWG C TEMP 13 Source: ECC PT1, To: 3GPP GERAN WG 1, 3GPP RAN 4, Cc: ) | ECC PT1 | - |
R4‑141043 | Draft LS on deployment scenario for Intra-band Non-contiguous CA | NTT DOCOMO, INC. | - |
R4‑141044 | TP to TS37.144 on adding tables of performance requirements for tablet devices | Intel Corporation | - |
R4‑141045 | R4-69AH-0100: TP to 36.851 on 7+8 Harmonic and IMD analysis (CA_7-8-20) | Vodafone | - |
R4‑141046 | R4-69AH-0101: TP for TR 36.853: For LTE_CA_B3_B7_B20 | TeliaSonera AB | - |
R4‑141047 | Low Cost MTC in LTE Band priorities for RAN4 specification | Vodafone | - |
R4‑141048 | EPDCCH test: final simulation results for EPDCCH demodulation performance | Ericson | - |
R4‑141049 | RSRQ Definition | Qualcomm Incorporated | - |
R4‑141050 | CRS interference cancellation in CoMP | Qualcomm Incorporated | - |
R4‑141051 | Performance evaluation of blind detection for NAICS receiver | Samsung | - |
R4‑141052 | On feasibility of blind detection for NAICS receiver | Samsung | - |
R4‑141053 | Discussion about test coverage of Further Downlink MIMO enhancement | LG Electronics | - |
R4‑141054 | UE performance considerations on intra-band NC CA under non-collocated deployment | Ericson | - |
R4‑141055 | CSI Reporting in SCell Activation Requirements | Ericsson, Intel, Alcatel-Lucent, Qualcomm, NTT DoCoMo, Samsung, Motorola Mobility, MediaTek, Huawei, HiSilicon | - |
R4‑141056 | Correction to release independent specification | Ericsson | - |
R4‑141057 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | - |
R4‑141058 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | - |
R4‑141059 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | - |
R4‑141060 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | - |
R4‑141061 | Correction to release independent specification | Ericsson | - |
R4‑141062 | Correction to release independent specification | Ericsson | - |
R4‑141063 | Correction to release independent specification | Ericsson | - |
R4‑141064 | Correction to release independent specification | Ericsson | - |
R4‑141065 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | - |
R4‑141066 | Test case list for CA RRM requirements with multiple TAGs | Huawei, HiSilicon | - |
R4‑141067 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R11 | Huawei, HiSilicon | - |
R4‑141068 | Corrections to CELL FACH test cases release 11 | Ericsson | - |
R4‑141069 | Corrections to CELL FACH test cases release 12 | Ericsson | - |
R4‑141070 | Test case on inter-frequency measurements and packet loss rate requirements | Ericsson | - |
R4‑141071 | CR on TM3 demodulation and soft buffer management test | Qualcomm Incorporated, Huawei, HiSilicon | - |
R4‑141072 | CR for maintanence of CA soft buffer tests in Rel-11 | Huawei, HiSilicon, Qualcomm | - |
R4‑141073 | Meeting minutes for CA performance ad hoc on Monday evening | Huawei, HiSilicon | - |
R4‑141074 | CR for introduction of15MHz based SDR tests and test point table in Rel-10 | Huawei, HiSilicon, Qualcomm | - |
R4‑141075 | UL-DL configuration and other parameters for FeICIC TDD CQI fading test (Rel-11) | Huawei, HiSilicon, Ericsson | - |
R4‑141076 | UL RTOA Measurement Accuracy Requirements | TruePosition | - |
R4‑141077 | Channel correlation model for X-pol 4x2 | Nvidia | - |
R4‑141078 | Performance of partially blind R-ML receivers in TM4/6 (2-Tx) | MediaTek Inc. | - |
R4‑141079 | CR for TS36.101 COMP demodulation requirements | ZTE | - |
R4‑141080 | CR for Combinations of channel model parameters | Huawei, HiSilicon, Ericsson | - |
R4‑141081 | CR to finalize fading CQI test for CoMP | Huawei, HiSilicon, Samsung, Qualcomm | - |
R4‑141082 | CR to finalize RI test for CoMP | Huawei, HiSilicon, Samsung, Qualcomm | - |
R4‑141083 | Summary of CoMP CSI results (TDD) | Huawei, HiSilicon | - |
R4‑141084 | Reply LS on extending the size of the neighbour cell list | Ericsson | - |
R4‑141085 | Link simulation assumptions for RSRP RSRQ for low-cost MTC with 1 Rx | Ericsson | - |
R4‑141086 | EDL-MIMO AH minutes | Alcatel Lucent | - |
R4‑141087 | Test parameters for PMI tst on 4Tx codebook | ZTE | - |
R4‑141088 | Way forward for Band 23 performance requirements | Huawei, HiSilicon | - |
R4‑141089 | Wayforward on PBCH-IC BLER | Huawei, HiSilicon | - |
R4‑141090 | Wayforward on test metric of FEICIC RI test-1 | Huawei, HiSilicon | - |
R4‑141091 | Wayforward on feICIC TM8 test | Qualcomm | - |
R4‑141092 | Text Proposals for TS 25.173 on introduction BDS to A-GANSS of TDD mode of UTRA | ZTE, Tejet | - |
R4‑141093 | Minutes for increasing carriers monitoring ad hoc | Ericsson | - |
R4‑141094 | Way forward on performance requiremnets for CA B27 | Qualcomm | - |
R4‑141095 | Addition of new OCNG pattern for E-UTRA TDD with 5MHz bandwidth | Huawei, HiSilicon, Ericsson | - |
R4‑141096 | Addition of new RMC for E-UTRA TDD with 5MHz bandwidth | Huawei, HiSilicon, Ericsson | - |
R4‑141097 | Addition of OCNG pattern for E-UTRA FDD with 5MHz bandwidth without MBSFN | Huawei, HiSilicon, Ericsson | - |
R4‑141098 | Way forward on Transmit Timing Topics in Rel-12 | Huawei, HiSilicon | - |
R4‑141099 | CR to finalize fading CQI test for CoMP | Huawei, HiSilicon, Samsung, Qualcomm | - |
R4‑141100 | CR to finalize RI test for CoMP | Huawei, HiSilicon, Samsung, Qualcomm | - |
R4‑141101 | RRM Test Case List for 10 MHz+3MHz bandwidth in CA | Ericsson, Huawei | - |
R4‑141102 | Way forward on the scalability issue for CA demodulation performance requirements | Huawei, HiSilicon | - |
R4‑141103 | CR of EPDCCH localzied test with TM10 QCL Type-B configuration (Rel-11) | Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Intel, Qualcomm | - |
R4‑141104 | Clarification of BW applicability in Rx-Tx Time Difference measurement R11 | Huawei, HiSilicon, Ericsson | - |
R4‑141105 | Clarification of BW applicability in Rx-Tx Time Difference measurement R12 | Huawei, HiSilicon, Ericsson | - |
R4‑141106 | Simulation assumptions for MBSFN RS based RSRP/RSRQ | Qualcomm | - |
R4‑141107 | CR on correction of downlink SDR tests with EPDCCH scheduling | Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm Incorporated, Huawei, HiSilicon, Ericsson | - |
R4‑141108 | Test parameters for PMI tst on 4Tx codebook | ZTE | - |
R4‑141109 | PCell Interruptions During Deactivated SCell Measurements | Qualcomm Incorporated | - |
R4‑141110 | Wayforward for INCMON | Ericsson | - |
R4‑141111 | High Doppler RSRP/RSRQ Results Summary | Ericsson | - |
R4‑141112 | Way forward on Relaxed Measurement Performance | Ericsson | - |
R4‑141113 | Link simulation assumptions for cell identification for low-cost MTC with 1 Rx | Ericsson | - |
R4‑141114 | RSTD inter-frequency requirements applicability | Ericsson | - |
R4‑141115 | Distributed EPDCCH Demodulation Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑141116 | Reference Measurement Channels for EPDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑141117 | CR on TM9 localized ePDCCH test | Qualcomm Incorporated, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Intel | - |
R4‑141118 | CR on reference measurement channel for ePDCCH test | Qualcomm Incorporated | - |
R4‑141119 | Simulation assumptions for inter-frequency RSRP/RSRQ measurement accuracy under TDD UL/DL configuration 0 | Huawei, HiSilicon | - |
R4‑141120 | Way forward on Rel-11 intra-band NC CA demodulation test cases | NSN | - |
R4‑141121 | Way forward on Rel-11 intra-band NC CA power imbalance related demodulation test cases | NSN | - |
R4‑141122 | LS on measurement patterns on relaxed measurements | Alcatel Lucent | - |
R4‑141123 | Draft CR to TS 25.172 on introduction BDS to A-GANSS of FDD mode of UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell , CATR, CATT, Huawei | - |
R4‑141124 | Draft CR to TS 36.171 on introduction BDS to A-GNSS of E-UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell , CATR, CATT, Huawei | - |
R4‑141125 | Correction on DL CoMP static CQI tests (Rel 11) | Intel Corporation | - |
R4‑141126 | Ad hoc minutes for NAICS | Mediatek | - |
R4‑141127 | Corrections to CELL FACH test cases release 11 | Ericsson | - |
R4‑141128 | Corrections to CELL FACH test cases release 12 | Ericsson | - |
R4‑141129 | Modification of UL RTOA Measurement Accuracy Requirements in TS 36.111 | TruePosition | - |
R4‑141130 | Correction on DL CoMP static CQI tests (Rel 11) | Intel Corporation | - |
R4‑141131 | Way forward on handling of interruption for single chip RF-IC implemnetation | NTT DoCoMo, CMCC, Verizon, Nokia, NSN, Huawei, HiSiliccon, ALU | - |
R4‑141132 | Draft CR to TS 25.172 on introduction BDS to A-GANSS of FDD mode of UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell , CATR, CATT, Huawei, Intel, Coolpad | - |
R4‑141133 | CR to TS 36.171 on introduction BDS to A-GNSS of E-UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell , CATR, CATT, Huawei, Intel, Coolpad | - |
R4‑141134 | Text proposal for RAN4 conclusions and phase II results for NAICS | MediaTek | - |
R4‑141135 | Methodology for studying OTDOA with RRH | Ericsson | - |
R4‑141136 | Wayforward for INCMON | Ericsson | - |
R4‑141137 | Text proposal for RAN4 conclusions and phase II results for NAICS | MediaTek | - |
R4‑141138 | Booked for RRM session | - | - |
R4‑141139 | Booked for RRM session | - | - |
R4‑141140 | Booked for RRM session | - | - |
R4‑141141 | Booked for RRM session | - | - |
R4‑141142 | Booked for RRM session | - | - |
R4‑141143 | Booked for RRM session | - | - |
R4‑141144 | Booked for RRM session | - | - |
R4‑141145 | Booked for RRM session | - | - |
R4‑141146 | Booked for RRM session | - | - |
R4‑141147 | Booked for RRM session | - | - |
R4‑141148 | Booked for RRM session | - | - |
R4‑141149 | Correction on tested frequency range | Huawei | - |
R4‑141150 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | - |
R4‑141151 | Clarification on BS Spurious emissions limits for co-existence | Ericsson | - |
R4‑141152 | Reply LS on the applicability of HPUE for release 8/9/10 devices | Qualcomm Incorporated | - |
R4‑141153 | Differential accuracy of Primary CCPCH power | CATT, ZTE | - |
R4‑141154 | Test models for BC3 BS | CATT, Ericsson | - |
R4‑141155 | Clarification of interfering signals for receiver intermodulation requirement in MSR | Ericsson | - |
R4‑141156 | Clarification of interfering signals for receiver intermodulation requirement in MSR | Ericsson | - |
R4‑141157 | Channel spacing for non-contiguous intra-band carrier aggregation | Ericsson | - |
R4‑141158 | Corrections in TS 36.141 | Ericsson | - |
R4‑141159 | Correction of table notes for NS_12-NS_15 spurious emissions requirements | Ericsson | - |
R4‑141160 | Text Proposal TS 36.112 Section 4 | TruePosition | - |
R4‑141161 | Text Proposal for TS 36.112 Section 6 | TruePosition | - |
R4‑141162 | Test Proposal for TS 36.112 Annex E | TruePosition | - |
R4‑141163 | Text Proposal for TS 36.112 Annex G | TruePosition | - |
R4‑141164 | Corrections in TS 36.141 | Ericsson | - |
R4‑141165 | LS reply on introduction of TS 25.327 | Ericsson | - |
R4‑141166 | CA features and release independence | Nokia Corporation | - |
R4‑141167 | Clarifications to Single Cluster Channel Model in TR 37.977 Clause 6 | Spirent Communications, Anite Telecoms Ltd | - |
R4‑141168 | TP for tablet testing TR 25.914 | Nokia Corporation, Sony Mobile, Intel Corporation | - |
R4‑141169 | TP to TS37.144 on adding tables of performance requirements for tablet devices | Intel Corporation | - |
R4‑141170 | CR to TR37.902 on improving tablets definition | Intel CorporationIntel Corporation, Sony Mobile | - |
R4‑141171 | CA_39C A-MPR | Nokia Corporation, Qualcomm Incorporated | - |
R4‑141172 | TP for TR 36.833-5-41: ACS | Sprint | - |
R4‑141173 | TP for TR 36.833-5-41: Spurious Emissions | Sprint | - |
R4‑141174 | TP for TR 36.833-5-41: Intermods | Sprint | - |
R4‑141175 | Work plan for LTE-A intra-band contiguous CA in Band 42 | CATT | - |
R4‑141176 | TP on operating bands and channel bandwidth for intra-band CA in Band 42 | CATT | - |
R4‑141177 | TP on spectrum and regulatory review for intra-band CA in Band 42 | CATT | - |
R4‑141178 | Way forward on REFSENS Specification of the CA_2A-2A | Ericsson | - |
R4‑141179 | AAS WI: Agenda and meeting minutes for Monday evening ad hoc | Huawei | - |
R4‑141180 | TP for TR36.833-2-42: Operating bands and channel bandwidths | Huawei, Hisilicon | - |
R4‑141181 | TP for TR 36.851: B1+B5 Harmonic and IMD analysis for 3DLs CA_1A_5A_7A band combination UE | LG Electronics, LG UPlus | - |
R4‑141182 | Harmonics and intermodulation products analysis supporting LTE-A CA of Band 1 and Band 3 | China Unicom, China Telecom, NSN, Nokia, KT, Huawe | - |
R4‑141183 | Text Proposal on Coexistence Studies of Harmonics and intermodulation products analysis supporting LTE-A CA of Band 1 and Band 3 | China Unicom, China Telecom, NSN, Nokia, KT, Huawe | - |
R4‑141184 | Harmonics and Intermod analysis for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | - |
R4‑141185 | TP for TR 36.851: Harmonics and Intermod analysis for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | - |
R4‑141186 | TP for TR36.851: LTE_CA_B3_B27 | KT | - |
R4‑141187 | Introduction of CA band combination Band 3 and Band 27 to TS 36.307 | KT | - |
R4‑141188 | Introduction of CA band B3+B27 to TS36.307 Rel-11 | KT | - |
R4‑141189 | Band 1 and Band 28 class A2 reference sensitivity | Qualcomm Incorporated, KDDI | - |
R4‑141190 | Band 7 and Band 8 class A2 reference sensitivity | Qualcomm Incorporated | - |
R4‑141191 | Text Proposal 4.3 AAS BS architecture | Huawei | - |
R4‑141192 | Harmonised MCL and AAS BS Classes TP for AAS BS | NEC, ALU, Ericsson, Huawei, NSN and ZTE | - |
R4‑141193 | Way forward on Beam Declaration | Ericsson | - |
R4‑141194 | Multi-band corrections in 37.141 chapter 6 | Ericsson | - |
R4‑141195 | Multi-band corrections in 37.141 chapter 7 | Ericsson | - |
R4‑141196 | BS RF core requirements for CA TDD-FDD | Ericsson | - |
R4‑141197 | Correction on manufacturer's declaration in TS37.141 | ZTE,Tejet | - |
R4‑141198 | Considerations for AAS EIRP accuracy declaration | NSN | - |
R4‑141199 | Way forward on Technical specification for AAS | Huawei | - |
R4‑141200 | Way forward on RF specifications for inter band CA 2UL | NTT Docomo | - |
R4‑141201 | Higher order IMD and harmonic table for UE self-desensitization analysis | Intel Corporation, MediaTek Inc., Qualcomm Incorporated, Broadcom Corporation, Nokia Corporation | - |
R4‑141202 | Reclassification of 2UL CA_3-8 from A2 to A4 | Qualcomm Incorporated, KT | - |
R4‑141203 | MB-MSR Ad Hoc minutes | Huawei | - |
R4‑141204 | IMD5 analysis in Class A4 for 2UL inter-band CA | Intel Corporation | - |
R4‑141205 | MPR table for 2UL intra-band NC CA | NTT Docomo | - |
R4‑141206 | Non-contiguous intraband Band CA REFSENS | Nokia Corporation | - |
R4‑141207 | Way forward on 2DL support when 3DL CA is implemented | Qualcomm | - |
R4‑141208 | TP for TR 36.853: Addition of 3DL configurations and bandwidth combinations | Ericsson | - |
R4‑141209 | Transmitter requirements for 3DL/1UL FDD following the agreed way forward | Ericsson | - |
R4‑141210 | Discussion on the harmonic relations for Band 7 and 8 and classification of DL combination and proposal on relaxations | Vodafone | - |
R4‑141211 | TP for TR 36.853: for LTE_CA_B1_B3_B8 | KT | - |
R4‑141212 | TP for TR 36.853: For LTE_CA_B3_B7_B20 BS specific | TeliaSonera AB | - |
R4‑141213 | Some corrections for MB-MSR in TS 37.141 | Huawei | - |
R4‑141214 | WF on D2D Coexistence | Qualcomm, Ericsson, Motorola solutions, LGE | - |
R4‑141215 | TP for TR 37.814: Co-existence with other 3GPP bands in Region 1 and Japan | Ericsson | - |
R4‑141216 | TP for TR 37.814: Background update | Ericsson | - |
R4‑141217 | on UE Maximum Input Level for Intra-band contiguous CA with 2 CCs | Anritsu, Intel, Nokia Corporation, Ericsson, Rohde & Schwarz | - |
R4‑141218 | Rx filter insertion loss for UTRA L-band 1452 1496 MHz and reference sensitivity for UTRA | Qualcomm Incorporated | - |
R4‑141219 | TP for TR 37.814: L-band UE REFSENS | Ericsson | - |
R4‑141220 | Blocking performance for UTRA Band I + SDL 1452 1496 MHz | Qualcomm Incorporated, Ericsson | - |
R4‑141221 | Editorial corrections to UE RF core requirements in TS 25.101 | Qualcomm Incorporated | - |
R4‑141222 | UE CA issues Ad-Hoc Minutes | Nokia Corporation | - |
R4‑141223 | Agreement for TDD-FDD band combinations and handling of WI | Nokia Corporation | - |
R4‑141224 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated, Huawei, Nokia Corporation, NII, MediaTek Inc., Broadcom Corporation, Intel Corporation, Sprint | - |
R4‑141225 | Way forward on band option for 2GHz MSS band for regions 1 and 3 | - | - |
R4‑141226 | TR 36.844 v1.2.0 on Study on Expansion of LTE_FDD_1670_US to include 1670-1680MHz Band for LTE in the US [FS_LTE_FDD_1670_US] | LightSquared Inc. | - |
R4‑141227 | BS RF core requirements for CA TDD-FDD | Ericsson | - |
R4‑141228 | Correction of Transmitter ON OFF requirement (TS 37.104 Rel-12) | Huawei | - |
R4‑141229 | Correction of Transmitter ON OFF requirement (TS 37.141 Rel-12) | Huawei | - |
R4‑141230 | Agreement for TDD-FDD band combinations and handling of WI | Nokia Corporation | - |
R4‑141231 | Introduction of test requirements for multi-band operation with conformance test improvement for multi-carrier testing (36.141, section 6 and 7) | NSN, Alcatel-Lucent, CATT, Ericsson, Huawei, ZTE | - |
R4‑141232 | TP for TR 36.851: Rib values for CA_39A-41A | CMCC | - |
R4‑141233 | Introduction of TDD inter-band CA_B39_B41 into 36.101 | CMCC | - |
R4‑141234 | Introduction of multi-band BS testing to TS 36.141 (Clauses 1 - 5) | Alcatel-Lucent, CATT, Huawei, NSN, ZTE, Ericsson | - |
R4‑141235 | Reply LS on half duplex FDD operation for Low complexity MTC UE | Huawei, HiSilicon | - |
R4‑141236 | Way forward on half duplex FDD operation for Low complexity MTC UE | Huawei | - |
R4‑141237 | SCE Ad Hoc minutes | Huawei | - |
R4‑141238 | SCE Ad Hoc minutes | Huawei | - |
R4‑141239 | Way forward on AAS conducted requirements | Huawei | - |
R4‑141240 | LS on RAN1 working assumption on dual connectivity (R1-141008 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑141241 | Reply LS on AGC and Frequency Error for D2D | Qualcomm Incorporated | - |
R4‑141242 | Way forward for TDD eIMTA feasibility study | CATT | - |
R4‑141243 | Work plan for LTE TDD-FDD joint operation including Carrier Aggregation | Nokia Corporation, NSN | - |
R4‑141244 | AAS Priority for RAN4#70bis | Huawei | - |
R4‑141245 | Indication of modified MPR behavior | Ericsson | - |
R4‑141246 | Indication of modified MPR behavior | Ericsson | - |
R4‑141247 | Indication of modified MPR behavior | Ericsson | - |
R4‑141248 | Indication of modified MPR behavior | Ericsson | - |
R4‑141249 | New WID: Performance requirements for the verification of radiated multi-antenna reception performance of LTE UEs | Intel Corporation | - |
R4‑141250 | Ad-Hoc on UE co-existence between adjacenent/close bands and for unsynchronized TDD operation inside the band | TeliaSonera | - |
R4‑141251 | LS on small cell on/off and discovery (R1-141021 Source: TSG RAN WG1), To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1) | - |
R4‑141252 | TP for UE TX requirements for S-band UE | LG Electronics | - |
R4‑141253 | TP for UE RX requirements for S-band UE | LG Electronics | - |
R4‑141254 | LS on BS classes and Maximum BS power for 256 QAM | Huawei | - |
R4‑141255 | TP for TR 36.833-5-41: Blocking Minimum Requirements | Sprint | - |
R4‑141256 | TP for TR36.851: LTE_CA_B3_B27 | KT | - |
R4‑141257 | Introduction of CA band combination Band 3 and Band 27 to TS 36.307 | KT | - |
R4‑141258 | IMD5 analysis in Class A4 for 2UL inter-band CA | Intel Corporation | - |
R4‑141259 | Higher order IMD and harmonic table for UE self-desensitization analysis | Intel Corporation, MediaTek Inc., Qualcomm Incorporated, Broadcom Corporation, Nokia Corporation | - |
R4‑141260 | Way forward on 2DL support when 3DL CA is implemented | Vodafone | - |
R4‑141261 | TP for TR 36.853: for LTE_CA_B1_B3_B8 | KT | - |
R4‑141262 | Editorial corrections to UE RF core requirements in TS 25.101 | Qualcomm Incorporated | - |
R4‑141263 | Editorial corrections to UE RF core requirements in TS 25.101 | Qualcomm Incorporated | - |
R4‑141264 | TP on operating bands and channel bandwidth for intra-band CA in Band 42 | CATT | - |
page generated from database: 2023-11-22 15:03:49