3GPP TDocs (written contributions) at meeting
Meeting: R1-73 - 2013-05-20 to 2013-05-24, Fukuoka
meeting id: R1-73 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑131830 | Draft Agenda for RAN1#73 meeting | RAN1 Chairman | Approved |
R1‑131831 | Final Report of RAN1#72bis meeting | MCC | Revised |
R1‑131832 | Reply LS on MCH support on NCT | RAN2, Ericsson | Noted |
R1‑131833 | Reply LS on wideband RSRQ scenarios for GERAN | RAN4, Renesas | Noted |
R1‑131834 | Response LS on the RS for additional carrier types for carrier aggregation enhancement | RAN4, Ericsson | Noted |
R1‑131835 | Proposal of Additional Channel Models for MIMO Performance Characterization | RAN4, Motorola | Noted |
R1‑131836 | LS on UE SCell activation delay in CA | RAN4, Huawei | Noted |
R1‑131837 | PSS/SSS and DMRS collision and NCT identification | Huawei, HiSilicon | Noted |
R1‑131838 | Further Performance evaluation of standalone NCT | Huawei, HiSilicon | Revised |
R1‑131839 | Deployment scenarios and complexity of NCT | Huawei, HiSilicon | Noted |
R1‑131840 | Mobility support across carrier types | Huawei, HiSilicon | Not treated |
R1‑131841 | PMCH on NCT | Huawei, HiSilicon | Not treated |
R1‑131842 | Evolution of transmission mode 10 for NCT | Huawei, HiSilicon | Not treated |
R1‑131843 | Transport block size optimization for NCT | Huawei, HiSilicon | Not treated |
R1‑131844 | Evaluations of 4TX codebook proposals | Huawei, HiSilicon | Not treated |
R1‑131845 | Remaining issues of aperiodic PUSCH 3-2 feedback mode | Huawei, HiSilicon | Not treated |
R1‑131846 | Dynamic signaling mechanisms for TDD eIMTA | Huawei, HiSilicon | Noted |
R1‑131847 | Backward compatibility for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑131848 | Analysis and evaluation on a "sweet spot" for coverage improvement | Huawei, HiSilicon | Noted |
R1‑131849 | Text proposal on conclusion for coverage improvement in section 10 | Huawei, HiSilicon | Noted |
R1‑131850 | Draft TR 36.872 update of small cell enhancement | Huawei, HiSilicon | Noted - Revised |
R1‑131851 | Performance analysis and standard impacts of downlink control signaling enhancements | Huawei, HiSilicon | Revised |
R1‑131852 | Performance evaluation and analysis for higher order modulation | Huawei, HiSilicon | Noted |
R1‑131853 | Standard impacts to support higher order modulation | Huawei, HiSilicon | Not treated |
R1‑131854 | Network adapation for small cell operation efficiency enhancement | Huawei, HiSilicon | Noted |
R1‑131855 | Load shifting/balancing and UE association enhancements | Huawei, HiSilicon | Noted |
R1‑131856 | Scenarios and solutions of radio-interface based synchronization mechanisms | Huawei, HiSilicon | Noted |
R1‑131857 | Physical layer support of upper layer aspects of small cell enhancements | Huawei, HiSilicon | Not treated |
R1‑131858 | Initial geometry results for calibration | Huawei, HiSilicon | Not treated |
R1‑131859 | Performance evaluation of elevation beamforming in the use scenarios | Huawei, HiSilicon | Not treated |
R1‑131860 | Discussion on remaining large scale parameters | Huawei, HiSilicon | Not treated |
R1‑131861 | Discussion on 3D channel modeling and text proposals | Huawei, HiSilicon | Noted |
R1‑131862 | Remaining details on evaluation methodology for D2D | Huawei, HiSilicon | Not treated |
R1‑131863 | Channel model for D2D evaluations | Huawei, HiSilicon | Not treated |
R1‑131864 | Physical layer options for D2D discovery | Huawei, HiSilicon | Not treated |
R1‑131865 | Physical layer options for D2D communication | Huawei, HiSilicon | Not treated |
R1‑131866 | Further results for PBCH Correlation Decoder for MTC Coverage Improvement | Sierra Wireless | Revised |
R1‑131867 | Restrictive Scheduling for SIBs for MTC coverage improvement | Sierra Wireless | Not treated |
R1‑131868 | Summary of email discussion on open issues for non-rectangular resource allocation for LCR TDD | CATT | Noted |
R1‑131869 | 25.222 CR0213 (Rel-12, B) Introduction of HSPA signalling enhancements for more efficient resource usage for LCR TDD | CATT, TD Tech, Potevio, New Postcom, CATR | Agreed |
R1‑131870 | 25.224 CR0273 (Rel-12, B) Introduction of HSPA signalling enhancements for more efficient resource usage for LCR TDD | CATT, TD Tech, Potevio, New Postcom, CATR | Agreed |
R1‑131871 | Handling of collision between PSS/SSS and DMRS | CATT | Not treated |
R1‑131872 | Benefits of standalone NCT | CATT | Revised |
R1‑131873 | Usage of TDD special subframes on NCT | CATT | Not treated |
R1‑131874 | Discussion on CSI-RS transmission on NCT | CATT | Not treated |
R1‑131875 | TBS optimization for NCT | CATT | Not treated |
R1‑131876 | Discussion on 4Tx codebook for rank1-2 | CATT | Not treated |
R1‑131877 | Discussion on 4Tx codebook for rank3-4 | CATT | Withdrawn |
R1‑131878 | Remaining details of CSI feedback | CATT | Not treated |
R1‑131879 | Further study on the performance and backhaul signaling requirements for CCIM | CATT | Revised |
R1‑131880 | Further study on the uplink power control | CATT | Revised |
R1‑131881 | Discussion on other interference mitigation schemes | CATT | Not treated |
R1‑131882 | Signaling mechanisms for TDD UL-DL reconfiguration | CATT | Not treated |
R1‑131883 | HARQ design for TDD eIMTA | CATT | Not treated |
R1‑131884 | UE measurements for TDD eIMTA | CATT | Not treated |
R1‑131885 | Other aspects for TDD eIMTA | CATT | Not treated |
R1‑131886 | Discussion and text proposal on table 9.5-1 in TR36.888 | CATT, MediaTek Inc. | Noted |
R1‑131887 | Conclusion and recommendations for low-cost MTC UEs | CATT | Not treated |
R1‑131888 | Downlink Control signaling enhancements for small cell | CATT | Noted |
R1‑131889 | Support of 256QAM for small cells | CATT | Noted |
R1‑131890 | Study on small cell DTX | CATT | Noted |
R1‑131891 | Study on small cell Discovery | CATT | Not treated |
R1‑131892 | Impact of antenna modeling on 3D-MIMO evaluation | CATT | Revised |
R1‑131893 | Channel modeling for 3D-MIMO | CATT | Not treated |
R1‑131894 | Further discussion on the evaluation methodology for D2D | CATT | Not treated |
R1‑131895 | Discussion on channel model for D2D evaluation | CATT | Noted |
R1‑131896 | On D2D discovery | CATT | Not treated |
R1‑131897 | On D2D communication | CATT | Not treated |
R1‑131898 | Further evaluation results on TDD UL-DL reconfigurations | CATT | Not treated |
R1‑131899 | Heterogeneous Deployment Scenarios for 3D Channel Modeling | Broadcom Corporation | Not treated |
R1‑131900 | Path Loss for 3D Channel Modeling | Broadcom Corporation | Revised |
R1‑131901 | 36.213 DraftCR (Rel-11, F) Correction on UE-specific RS scrambling for SPS PDSCH in TM10 | Intel Corporation | Noted - Revised |
R1‑131902 | 36.213 DraftCR (Rel-10, F) Correction to define the spatial domain bundling in carrier aggregation | Intel Corporation | Noted |
R1‑131903 | Discussion on collision between PSS/SSS and DM RS in NCT | Intel Corporation | Noted |
R1‑131904 | Discussion on standalone NCT | Intel Corporation | Noted |
R1‑131905 | Considerations on CRS population in NCT | Intel Corporation | Revised |
R1‑131906 | Views on transmission mode and QCL for NCT | Intel Corporation | Not treated |
R1‑131907 | Discussion on downlink transmission for special subframe in TDD | Intel Corporation | Not treated |
R1‑131908 | Considerations on CSI-RS transmission in TDD | Intel Corporation | Not treated |
R1‑131909 | Discussion on NCT indication | Intel Corporation | Not treated |
R1‑131910 | MBMS support in NCT | Intel Corporation | Not treated |
R1‑131911 | Remaining details of rank 1/2 codebook | Intel Corporation | Noted |
R1‑131912 | Remaining details of rank 3/4 codebook | Intel Corporation | Noted |
R1‑131913 | Remaining details of MU-CSI | Intel Corporation | Noted |
R1‑131914 | On small cell discovery signal | Intel Corporation | Not treated |
R1‑131915 | Preliminary large scale results for 3D-channel calibration | Intel Corporation | Not treated |
R1‑131916 | On 3D channel model extension | Intel Corporation | Not treated |
R1‑131917 | Remaining details of NAICS scenarios | Intel Corporation | Noted |
R1‑131918 | Channels of interests for NAICS evaluations | Intel Corporation | Not treated |
R1‑131919 | DL-UL interference mitigation schemes and performance analysis of Pico-Pico co-channel scenario | Intel Corporation | Noted |
R1‑131920 | DL-UL interference mitigation schemes and performance analysis of Macro-Pico adjacent channel scenario | Intel Corporation | Not treated |
R1‑131921 | Discussion on reconfiguration signalling mechanisms for TDD UL-DL reconfiguration | Intel Corporation | Not treated |
R1‑131922 | Proposal on UE-UE channel modeling for agreed D2D deployment scenarios | Intel Corporation | Noted |
R1‑131923 | Overview of pathloss models for D2D system level analysis | Intel Corporation | Not treated |
R1‑131924 | Discussion on design options for D2D discovery | Intel Corporation | Noted |
R1‑131925 | Discussion on design options for D2D communication | Intel Corporation | Not treated |
R1‑131926 | Consideration on TBS of NCT | Fujitsu | Not treated |
R1‑131927 | Evaluations on 4Tx Codebook Enhancement for DL MIMO | Fujitsu | Not treated |
R1‑131928 | Consideration regarding additional information for new aperiodic PUSCH feedback mode | Fujitsu | Noted |
R1‑131929 | Discussion on remaining details of CSI feedback modes | Fujitsu | Not treated |
R1‑131930 | Evaluation on efficient discovery of Small Cells | Fujitsu | Not treated |
R1‑131931 | Initial calibration results for 3D channel modeling | Fujitsu | Not treated |
R1‑131932 | Considerations of channel model of the LTE Device to Device proximity services | Fujitsu | Not treated |
R1‑131933 | Discussion on D2D discovery | Fujitsu | Not treated |
R1‑131934 | Draft TS 36.211 CR on Correction to EPDCCH PRB pair indication | Texas Instruments | Noted - Revised |
R1‑131935 | Terminology for cell-specific antenna ports on SCells | Texas Instruments | Noted |
R1‑131936 | Collision handling between PRS and EPDCCH | Texas Instruments | Noted |
R1‑131937 | Mapping of PSS/SSS and UERS on the New Carrier Type | Texas Instruments | Not treated |
R1‑131938 | Comparison of a standalone NCT to a legacy carrier type | Texas Instruments | Not treated |
R1‑131939 | Energy efficiency considerations for a NCT | Texas Instruments | Noted |
R1‑131940 | MBMS reception on the NCT | Texas Instruments | Not treated |
R1‑131941 | On 4Tx codebook enhancement | Texas Instruments | Not treated |
R1‑131942 | Performance evaluation of new 4Tx codebook: rank-1/2 | Texas Instruments | Revised |
R1‑131943 | On rank-3/4 codebook design for 4Tx | Texas Instruments | Revised |
R1‑131944 | Finalising CSI feedback modes in Rel.12 | Texas Instruments | Not treated |
R1‑131945 | Signaling mechanisms for dynamic TDD UL/DL Reconfiguration | Texas Instruments | Not treated |
R1‑131946 | On multi-subframe and cross-subframe scheduling for small cell enhancements | Texas Instruments | Noted |
R1‑131947 | On higher order modulation schemes for small cell enhancements | Texas Instruments | Withdrawn |
R1‑131948 | Discussion of interference avoidance and coordination mechanisms for small cell enhancements | Texas Instruments | Withdrawn |
R1‑131949 | On the feasibility and benefits of radio-interface based synchronization mechanisms | Texas Instruments | Noted |
R1‑131950 | Updated required system functionality for enhanced coverage MTC devices. | Fujitsu | Revised |
R1‑131951 | Conclusions and Recommendations in TR36.888 | Fujitsu | Not treated |
R1‑131952 | On scenarios for cross-subframe/multi-subframe scheduling | Fujitsu | Noted |
R1‑131953 | Discussion on UE SCell activation delay in CA | Samsung | Not treated |
R1‑131954 | 36.213 CR0418 (Rel-11, F) on RI-reference CSI process with subframe sets | Samsung | Agreed |
R1‑131955 | Discussions and proposals for resolving collision between DMRS and PSS in NCT | Samsung | Noted |
R1‑131956 | Trade-offs for a standalone NCT | Samsung | Noted |
R1‑131957 | Performance considerations for standalone NCT | Samsung | Noted |
R1‑131958 | Discussion on the remaining issues of TRS | Samsung | Not treated |
R1‑131959 | Discussion on MCH support on NCT | Samsung | Not treated |
R1‑131960 | Discussion on antenna port quasi co-location issues for NCT | Samsung | Not treated |
R1‑131961 | Discussion on short DwPTS without DMRS in NCT | Samsung | Not treated |
R1‑131962 | Evaluation results for 4Tx codebook enhancement: rank 1-2 | Samsung | Not treated |
R1‑131963 | Discussion on MU-CSI | Samsung | Not treated |
R1‑131964 | Remaining details on PUSCH CSI reporting mode 3-2 | Samsung | Not treated |
R1‑131965 | DL and UL power control for eIMTA | Samsung | Not treated |
R1‑131966 | X2 signaling for supporting interference mitigation in eIMTA | Samsung | Noted |
R1‑131967 | CRS presence in flexible subframes | Samsung | Not treated |
R1‑131968 | DL subframe set based mechanism to support TDD UL-DL reconfiguration | Samsung | Not treated |
R1‑131969 | Evaluation results for power control based inteference mitigation | Samsung | Not treated |
R1‑131970 | Downlink signaling for TDD UL-DL reconfiguration | Samsung | Noted |
R1‑131971 | Discussion on other potential issues for TDD UL/DL reconfigurations | Samsung | Not treated |
R1‑131972 | On HARQ operation for TDD UL-DL reconfiguration | Samsung | Not treated |
R1‑131973 | Coverage enhancements for low-cost MTC UEs | Samsung | Not treated |
R1‑131974 | Control signaling enhancements for small cells | Samsung | Revised |
R1‑131975 | Link level evaluation results and discussion on 256QAM for small cells | Samsung | Noted |
R1‑131976 | System level evaluation results and discussion on 256QAM for small cells | Samsung | Revised |
R1‑131977 | Evaluation results on coordination for SCE scenario 1 | Samsung | Noted |
R1‑131978 | Evaluation results on coordination for SCE scenario 2a with non-ideal backhaul | Samsung | Noted |
R1‑131979 | Evaluation results on small cell load shifting | Samsung | Noted |
R1‑131980 | Cell discovery for efficient small cell operation | Samsung | Not treated |
R1‑131981 | Evaluation results on small cell discovery | Samsung | Not treated |
R1‑131982 | Discussion on radio-interface based synchronization schemes | Samsung | Not treated |
R1‑131983 | Discussion on scenarios and evaluation of radio-interface based synchronization mechanisms | Samsung | Not treated |
R1‑131984 | Considerations on dual connectivity | Samsung | Not treated |
R1‑131985 | Initial evaluation results for dual connectivity | Samsung | Not treated |
R1‑131986 | Further details on scenarios for elevation beamforming and FD-MIMO | Samsung | Not treated |
R1‑131987 | Initial calibration results of channel model | Samsung | Not treated |
R1‑131988 | Remaining details for PL for 3D channel modeling | Samsung | Noted |
R1‑131989 | Proposals for extending ITU-R channel models to 3D | Samsung | Not treated |
R1‑131990 | User association for D2D direct communication | Samsung | Not treated |
R1‑131991 | D2D channel model | Samsung | Not treated |
R1‑131992 | Considerations on D2D resources | Samsung | Not treated |
R1‑131993 | Considerations on D2D discovery signal structure | Samsung | Not treated |
R1‑131994 | Discussion on D2D discovery | Samsung | Not treated |
R1‑131995 | Required information for D2D discovery | Samsung | Not treated |
R1‑131996 | Discussion on D2D communication | Samsung | Not treated |
R1‑131997 | Discussion on design aspects for D2D group communication | Samsung | Not treated |
R1‑131998 | Discussion on further details of NAICS evaluation | Samsung | Not treated |
R1‑131999 | Discussion on prioritization of channels for NAICS evaluation | Samsung | Not treated |
R1‑132000 | Diminishing returns from PBCH coverage extension with PSD boosting | Sony | Not treated |
R1‑132001 | On bandwidth of ESS | Ericsson,ST-Ericsson | Revised |
R1‑132002 | RRM measurements on NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132003 | On EMBMS and PMCH operation for NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132004 | PSS/SSS on the new carrier type | Ericsson,ST-Ericsson | Noted |
R1‑132005 | Spectral efficiency gains with the standalone NCT | Ericsson,ST-Ericsson | Revised |
R1‑132006 | Discussion on benefits with the standalone NCT | Ericsson,ST-Ericsson | Noted |
R1‑132007 | Heterogeneous deployments with NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132008 | Evaluations of the beneficial CSO operating points for the NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132009 | Quasi Co-Location Assumptions for NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132010 | Transmission mode handling for NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132011 | On CSI-RS and CSI-IM for NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132012 | On EPDCCH operation for NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132013 | On ePHICH operation for NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132014 | On Dynamic TDD on NCT | Ericsson,ST-Ericsson | Not treated |
R1‑132015 | MCS and TBS tables for NCT PDSCH | Ericsson,ST-Ericsson | Not treated |
R1‑132016 | Evaluation of new codebook for up to two layers | Ericsson,ST-Ericsson | Noted |
R1‑132017 | Evaluation of new codebook for more than two layers | Ericsson,ST-Ericsson | Noted |
R1‑132018 | On MU MIMO specific feedback enhancements | Ericsson,ST-Ericsson | Not treated |
R1‑132019 | Coverage enhancements for MTC – PUSCH link results | Ericsson,ST-Ericsson | Not treated |
R1‑132020 | Coverage enhancements for MTC – packet round trip time | Ericsson,ST-Ericsson | Not treated |
R1‑132021 | Coverage enhancements for MTC – conclusions and recommendations | Ericsson,ST-Ericsson | Noted |
R1‑132022 | Evaluation of power control based interference mitigation | Ericsson,ST-Ericsson | Noted |
R1‑132023 | On the need of new backhaul signalling for interference mitigation | Ericsson,ST-Ericsson | Noted |
R1‑132024 | On efficient signalling of Dynamic TDD | Ericsson,ST-Ericsson | Not treated |
R1‑132025 | On the need for aiding explicit signalling | Ericsson,ST-Ericsson | Noted |
R1‑132026 | On uplink transmission in MBSFN subframe for dynamic TDD | Ericsson,ST-Ericsson | Not treated |
R1‑132027 | On CSI enhancements for Dynamic TDD | Ericsson,ST-Ericsson | Not treated |
R1‑132028 | D2D for LTE Proximity Services: Overview | Ericsson,ST-Ericsson | Noted |
R1‑132029 | Synchronization Procedures for D2D Discovery and Communication | Ericsson,ST-Ericsson | Noted |
R1‑132030 | Channel models for D2D performance evaluation | Ericsson,ST-Ericsson | Noted |
R1‑132031 | Direct Discovery for LTE Based D2D | Ericsson,ST-Ericsson | Noted |
R1‑132032 | On UE SCell activation delay in CA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132033 | Evaluation of uplink performance for co-channel het net | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132034 | Text proposal for decentralised bias optimisation for CRE | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑132035 | Further consideration of DF-DC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132036 | On macro-assisted interference suppression/cancellation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132037 | 36.213 CR0417 (Rel-11, F) Correction to PUSCH/PUCCH transmit power after PRACH power ramping | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, AT&T, Ericsson,ST-Ericsson | Noted - Revised |
R1‑132038 | Handling of PRBs containing PSS/SSS on NCT | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132039 | Standalone NCT: Consideration of benefits and possible ways forward | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132040 | MBMS support on NCT | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132041 | (E)PHICH on NCT | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132042 | On the bandwidth of reduced CRS on NCT | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132043 | Draft CR for 36.211 for DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑132044 | Draft CR for 36.212 for DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑132045 | Draft CR for 36.213 for DL MIMO Enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑132046 | Remaining details of enhanced 4-tx codebook for rank 1-2 | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132047 | Summary of options for enhanced 4-tx codebook for rank 3-4 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑132048 | Discussion of MU-CQI | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132049 | Details of CSI feedback modes for DL MIMO Enhancement | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132050 | Backhaul signalling analysis for eIMTA interference mitigation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132051 | Potential backhaul signalling enhancements for eIMTA interference mitigation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132052 | On cell lusterting for eIMTA interference mitigation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132053 | Comparison of signalling mechanisms for TDD UL-DL reconfiguration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132054 | Discussion on HARQ/scheduling in TDD eIMTA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132055 | Configurable repetition level for PBCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132056 | Proposal for conclusions for study on low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132057 | On multi-subframe and cross-subframe scheduling | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132058 | Consideration of implementation issues for 256 QAM | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132059 | Small Cell interference mitigation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132060 | On small cell discovery | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132061 | Discussion of small cell synchronization methods | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132062 | Initial validation of 3D channel modelling | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132063 | 3D Channel Measurement Results for UMa Scenario | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132064 | Simulation verification of modified 3D channel model | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑132065 | Remaining details of scenarios and evaluation methodology | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132066 | D2D channel model | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132067 | General considerations for D2D discovery | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑132068 | Discussion of D2D discovery methods | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑132069 | Consideration of resource used and power setting for D2D communication | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132070 | Resource allocation and multiplexing for D2D and UE-to-EUTRAN communication | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑132071 | Timing of D2D transmissions and impact on the LTE system | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132072 | Channels of interest for NAICS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑132073 | Liaison statement on performance during network failure | ITU-T Study Group 15, Calnex Solutions, Ericsson | Noted |
R1‑132074 | Usage of PRBs containing PSS/SSS in NCT | HTC | Not treated |
R1‑132075 | Discussion on TDD UL-DL Reconfiguration in TDD eIMTA Systems | HTC | Not treated |
R1‑132076 | On HARQ Timing Issues in TDD eIMTA Systems | HTC | Not treated |
R1‑132077 | Control Signalling Enhancements for Improved Spectral Efficiency | HTC | Noted |
R1‑132078 | Physical Layer Considerations on Dual Connectivity | HTC | Not treated |
R1‑132079 | UE Energy Consumptin Model for D2D Evaluation | HTC | Not treated |
R1‑132080 | Indoor to Indoor fast fading model considering Pedestrian Moving for D2D evaluation | HTC | Not treated |
R1‑132081 | Physical layer considerations on D2D discovery | HTC | Revised |
R1‑132082 | Device Discovery in D2D Communications | HTC | Not treated |
R1‑132083 | Physical layer considerations on D2D communication | HTC | Revised |
R1‑132084 | RE Mapping for Small Cell Discovery Signal Based on Unused Res | ZTE | Not treated |
R1‑132085 | On HARQ procedure for non-ideal backhaul | ZTE | Not treated |
R1‑132086 | Discussion of MBMS operation for NCT | ZTE | Not treated |
R1‑132087 | Discussion of Reduced CRS on NCT | ZTE | Not treated |
R1‑132088 | NCT scenarios for evaluation and deployment | ZTE | Not treated |
R1‑132089 | Interference analysis on Small Cell On/Off Switching | ZTE | Not treated |
R1‑132090 | On Transport Block Sizes for NCT | ZTE | Not treated |
R1‑132091 | On EVM and UE receiver impairment for 256QAM | ZTE | Not treated |
R1‑132092 | Control overhead reduction for small cell | ZTE | Not treated |
R1‑132093 | Evaluation of stand-alone NCT | ZTE | Revised |
R1‑132094 | Collision between DMRS and PSS/SSS in NCT | ZTE | Noted |
R1‑132095 | ePDCCH monitoring in PRS subframe | ZTE | Not treated |
R1‑132096 | Remaining details on scenarios and simulation assumption for NAICS | ZTE | Noted |
R1‑132097 | Consideration on channels of interest for NAICS | ZTE | Not treated |
R1‑132098 | Interference avoidance and coordination enhancement in small cell | ZTE | Noted |
R1‑132099 | Initial calibration of 3D channel model and remaining issues of antenna modelling | ZTE | Revised |
R1‑132100 | Discussion on 3D channel Modelling | ZTE | Not treated |
R1‑132101 | Performance evaluation of enhanced 4Tx codebook for Rank 1-2 | ZTE | Noted |
R1‑132102 | Performance evaluation of enhanced 4Tx codebook for Rank 3-4 | ZTE | Not treated |
R1‑132103 | Discussion on interference measurement for MU-CSI | ZTE | Not treated |
R1‑132104 | Remaining issues of new aperiodic PUSCH feedback mode | ZTE | Revised |
R1‑132105 | UL PC enhancement in multi-cell scenario | ZTE | Not treated |
R1‑132106 | DL interference measurement and CSI feedback enhancement in multi-cell scenario | ZTE | Not treated |
R1‑132107 | OI enhancement in multi-cell scenario | ZTE | Noted |
R1‑132108 | issues about data transmission in TDD-eIMTA | ZTE | Not treated |
R1‑132109 | Signaling mechanism for TDD UL/DL configuration | ZTE | Noted |
R1‑132110 | Diminishing returns and coverage improvement summary for TR36.888 | ZTE | Noted |
R1‑132111 | PSD boosting performance evaluation of PRACH for TR36.888 | ZTE | Revised |
R1‑132112 | LS on coverage improvement of Low-Cost MTC UEs based on LTE | ZTE | Not treated |
R1‑132113 | Channel model for LTE device-to-device proximity services | ZTE | Not treated |
R1‑132114 | Scenarios, Requirement and Scheme Discussion of D2D Discovery | ZTE | Not treated |
R1‑132115 | Discussions on LTE Device to Device Communication | ZTE | Not treated |
R1‑132116 | Draft TS36.213CR Correction on n_{HARQ} for TDD CA with different UL-DL configurations | CATT | Noted - Revised |
R1‑132117 | Draft TS36.213CR Correction on implicit HARQ-ACK resource determination for PUCCH format 1b with channel selection for TDD CA with different UL-DL configurations | CATT | Noted - Revised |
R1‑132118 | Draft TS36.212CR Correction on ARO bit setting for DL DCIs carried by EPDCCH | CATT, Texas Instruments | Noted - Revised |
R1‑132119 | Draft TS36.213CR Correction on SRS power scaling with multiple TAGs | CATT | Noted - Revised |
R1‑132120 | Evaluation of downlink performance with non-full-buffer traffic for co-channel het net | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑132121 | 3D antenna modeling | Kathrein | Not treated |
R1‑132122 | On Basic Principles of Simulator Calibration | Ericsson,ST-Ericsson | Not treated |
R1‑132123 | LOS Modelling for 3D-Channels | Ericsson,ST-Ericsson | Noted |
R1‑132124 | NLOS Modelling for 3D-Channels | Ericsson,ST-Ericsson | Noted |
R1‑132125 | On Remaining Details of NAICS Scenarios | Ericsson,ST-Ericsson | Noted |
R1‑132126 | Channels of Interest in NAICS Studies | Ericsson,ST-Ericsson | Not treated |
R1‑132127 | 36.213 DraftCR (Rel-10, F) Correction on HARQ-ACK transmission for a UE configured with PUCCH format 3 | Intel Corporation, Qualcomm Inc., LG Electronics, Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑132128 | 36.212 DraftCR (Rel-10, F) Correction to define the spatial domain bundling in carrier aggregation | Intel Corporation | Noted |
R1‑132129 | Discussion on CSI measurements and transmission modes for LTE-TDD eIMTA | Intel Corporation | Not treated |
R1‑132130 | Discussion on remaining details of D2D scenarios and evaluation methodology | Intel Corporation | Not treated |
R1‑132131 | 36.213 Draft CR (Rel-11, F) on error DCI carried by EPDCCH | Intel Corporation | Noted |
R1‑132132 | 36.211 Draft CR (Rel-11, F) on SPS PDSCH to RE mapping | Intel Corporation | Noted |
R1‑132133 | 36.213 DraftCR Corrections on DRX handling | Panasonic | Noted |
R1‑132134 | Handling of the collision between PRS and EPDCCH | Panasonic | Not treated |
R1‑132135 | Standalone NCT scenario | Panasonic | Not treated |
R1‑132136 | UL power control method to mitigate interference in eIMTA | Panasonic | Not treated |
R1‑132137 | Signalling for flexible subframes and determination of their usage | Panasonic | Not treated |
R1‑132138 | Discussion on 256QAM for Downlink in Small Cell Deployments | Panasonic | Not treated |
R1‑132139 | ICIC among small cells | Panasonic | Noted |
R1‑132140 | Traffic offloading from macro cell to small cell | Panasonic | Withdrawn |
R1‑132141 | Small cell interference mitigation based on downlink power control | Panasonic | Noted |
R1‑132142 | Discussion on small cell discovery issues | Panasonic | Not treated |
R1‑132143 | Emulated RSSI | Panasonic | Not treated |
R1‑132144 | Potential control mechanisms for D2D communication | Panasonic | Not treated |
R1‑132145 | On Multi-Subframe and Cross-Subframe Scheduling | Ericsson,ST-Ericsson | Noted |
R1‑132146 | Transmission of PDSCH and ePDCCH in the First OFDM Symbol | Ericsson,ST-Ericsson | Noted |
R1‑132147 | Discussion and Evaluation of 256 QAM | Ericsson,ST-Ericsson | Noted |
R1‑132148 | Interference Avoidance Techniques for Small Cells | Ericsson,ST-Ericsson | Noted |
R1‑132149 | Coverage Hole Avoidance | Ericsson,ST-Ericsson | Not treated |
R1‑132150 | On Measurement Performance of Small Cell Discovery | Ericsson,ST-Ericsson | Not treated |
R1‑132151 | On Radio-Interface based synchronization mechanisms | Ericsson,ST-Ericsson | Not treated |
R1‑132152 | Physical layer aspects of dual connectivity | Ericsson,ST-Ericsson | Not treated |
R1‑132153 | Downlink System Simulation Results on Heterogeneous Networks | Renesas Mobile Europe Ltd | Noted |
R1‑132154 | Uplink System Simulation Results on Heterogeneous Networks | Renesas Mobile Europe Ltd | Noted |
R1‑132155 | Simulation Results on Transmission of Uplink Scheduling Information in UMTS Heterogeneous Networks | Renesas Mobile Europe Ltd | Noted |
R1‑132156 | Text Proposal on Transmission of Uplink Scheduling Information in UMTS Heterogeneous Networks | Renesas Mobile Europe Ltd | Noted |
R1‑132157 | Discussion on Scalable UMTS UE complexity | Renesas Mobile Europe Ltd | Noted |
R1‑132158 | PSS/SSS Mapping in NCT | Renesas Mobile Europe Ltd | Not treated |
R1‑132159 | Use cases for standalone new carrier type | Renesas Mobile Europe Ltd | Not treated |
R1‑132160 | RRM measurement in NCT | Renesas Mobile Europe Ltd | Not treated |
R1‑132161 | Rank 1-2 performance of double codebook for four DL antenna ports | Renesas Mobile Europe Ltd | Revised |
R1‑132162 | Rank 3-4 performance of double codebook for four DL antenna ports | Renesas Mobile Europe Ltd | Not treated |
R1‑132163 | Considerations on multiuser CSI feedback | Renesas Mobile Europe Ltd | Not treated |
R1‑132164 | Remaining open issues of CSI feedback modes | Renesas Mobile Europe Ltd | Noted |
R1‑132165 | Cell-Clustering in Rel-12 Deployment Scenarios | Renesas Mobile Europe Ltd | Not treated |
R1‑132166 | Performance Comparison of Interference Mitigation Schemes with Dynamic TDD UL/DL configuration in Multi-Cell Pico Deployment Scenario | Renesas Mobile Europe Ltd | Not treated |
R1‑132167 | Aspects of Cell-Clustering in Modified Rel. 12 Small-Cell Scenarios | Renesas Mobile Europe Ltd | Not treated |
R1‑132168 | Further Discussion on Signaling Schemes for TDD eIMTA | Renesas Mobile Europe Ltd | Noted |
R1‑132169 | HARQ Aspects in TDD eIMTA | Renesas Mobile Europe Ltd | Not treated |
R1‑132170 | Backwards compatibility in TDD eIMTA | Renesas Mobile Europe Ltd | Not treated |
R1‑132171 | Evaluation of 256QAM in small cells | Renesas Mobile Europe Ltd | Noted |
R1‑132172 | Simulation results on small cell discovery | Renesas Mobile Europe Ltd | Revised |
R1‑132173 | ProSe UE discovery design aspects | Renesas Mobile Europe Ltd | Noted |
R1‑132174 | ProSe direct communications (D2D) | Renesas Mobile Europe Ltd | Not treated |
R1‑132175 | Remaining open issues for NAICS scenarios | Renesas Mobile Europe Ltd | Noted |
R1‑132176 | Further considerations on the channels of interest for NAICS | Renesas Mobile Europe Ltd | Not treated |
R1‑132177 | Collision handling between PRS and EPDCCH | InterDigital | Not treated |
R1‑132178 | Transmission Mode and QCL behaviour for NCT | InterDigital | Not treated |
R1‑132179 | On eMBMS support and PMCH operation for NCT | InterDigital | Not treated |
R1‑132180 | On explicit and implicit signaling mechanisms for TDD UL-DL reconfiguration | InterDigital | Not treated |
R1‑132181 | System performance evaluation of small cells Scenario 2a | InterDigital | Revised |
R1‑132182 | Discovery of small cells | InterDigital | Not treated |
R1‑132183 | Physical layer aspects of dual connectivity | InterDigital | Not treated |
R1‑132184 | Discussion on 3D channel model extension | InterDigital | Revised |
R1‑132185 | Recommendations for remaining details of D2D scenarios and evaluation methodology | InterDigital | Withdrawn |
R1‑132186 | On the use of UL or DL radio resources for D2D | InterDigital | Noted |
R1‑132187 | D2D Discovery in LTE | InterDigital | Noted |
R1‑132188 | D2D Communication in LTE | InterDigital | Not treated |
R1‑132189 | Discussion on calibration of 2D antenna array model | New Postcom | Not treated |
R1‑132190 | Discussion on different channel interferences for NAICS | New Postcom | Not treated |
R1‑132191 | Power control for interference management of small cells | New Postcom | Noted |
R1‑132192 | Discussion on PUSCH feedback mode 3-2 | New Postcom | Not treated |
R1‑132193 | Small cell control signalling reduction | New Postcom | Not treated |
R1‑132194 | Clarification on bandwidth configuration in 36.932 | New Postcom | Not treated |
R1‑132195 | Further consideration on reduced CRS for new carrier type | New Postcom | Not treated |
R1‑132196 | Legacy control channel configuration for new carrier types | New Postcom | Not treated |
R1‑132197 | Benefit analysis for standalone NCT scenarios | New Postcom | Not treated |
R1‑132198 | Discussion on MU-CSI | New Postcom | Not treated |
R1‑132199 | Considerations on issues of interference mitigation schemes | New Postcom | Not treated |
R1‑132200 | Discussion on Standalone NCT | China Telecom | Not treated |
R1‑132201 | System Impact Analysis on PRACH Coverage Improvement for MTC UEs | China Telecom | Not treated |
R1‑132202 | Discussion on multi-subframe scheduling | China Telecom | Noted |
R1‑132203 | Views on Interference Avoidance and Coordination for SCE | China Telecom | Noted |
R1‑132204 | Views on Small Cell Discovery | China Telecom | Not treated |
R1‑132205 | Discussion on dual connectivity | China Telecom | Not treated |
R1‑132206 | Necessity of Stand-alone NCT in Rel-12 | KDDI | Noted |
R1‑132207 | Impact of CRS Interference among Small Cells | KDDI | Not treated |
R1‑132208 | Views on Small Cell Discovery | KDDI | Not treated |
R1‑132209 | Requiements for Radio-interface Based Synchronization | KDDI | Noted |
R1‑132210 | A proposal on calibration campaign of D2D simulations | KDDI | Not treated |
R1‑132211 | Discussion about resource allocation schemes for D2D discovery | KDDI | Not treated |
R1‑132212 | Discussion for CR on MBSFN subframe configuration | LG Electronics | Noted |
R1‑132213 | Correction on MBSFN subframe configuration | LG Electronics | Revised |
R1‑132214 | Draft CR on SPS PDSCH mapping | LG Electronics | Noted |
R1‑132215 | TA difference in multiple TA operation | LG Electronics | Noted |
R1‑132216 | Correction to TA difference between TAGs | LG Electronics, Panasonic | Noted |
R1‑132217 | Correction on PUCCH power control | LG Electronics | Noted |
R1‑132218 | Considerations on Standalone Functionality of NCT | LG Electronics | Noted |
R1‑132219 | Considerations on tracking RS in NCT | LG Electronics | Not treated |
R1‑132220 | PHICH for NCT | LG Electronics | Not treated |
R1‑132221 | Support of TDD special subframe for the new carrier type | LG Electronics | Not treated |
R1‑132222 | Design of 4tx codebook for DL MIMO enhancement | LG Electronics | Not treated |
R1‑132223 | Discussion on 4 Tx codebook for rank 3/4 | LG Electronics | Not treated |
R1‑132224 | IMR based MU-CQI feedback | LG Electronics | Not treated |
R1‑132225 | Remaining issues on a new CSI feedback mode | LG Electronics | Noted |
R1‑132226 | Air Interface Support for ICIC in Dynamic TDD UL-DL Reconfigurations | LG Electronics | Not treated |
R1‑132227 | Backhaul Signaling Support for ICIC in Dynamic TDD UL-DL Reconfigurations | LG Electronics | Not treated |
R1‑132228 | Performance Analysis of Interference Mitigation Schemes for TDD eIMTA | LG Electronics | Noted |
R1‑132229 | Further Study on the Deployment Scenarios for TDD eIMTA | LG Electronics | Not treated |
R1‑132230 | On the UE Behavior under Dynamic UL-DL Configuration Changes | LG Electronics | Not treated |
R1‑132231 | Signaling Mechanisms for TDD eIMTA | LG Electronics | Not treated |
R1‑132232 | Further Considerations on TDD eIMTA | LG Electronics | Not treated |
R1‑132233 | Discussion on coverage enhancement of SIB and RRC signaling | LG Electronics | Not treated |
R1‑132234 | Further consideration points for provision of MTC UEs | LG Electronics | Not treated |
R1‑132235 | Support of multi/cross-subframe scheduling in small cell scenarios | LG Electronics | Not treated |
R1‑132236 | Analysis and design considerations of cell on/off in small cell | LG Electronics | Noted |
R1‑132237 | Considerations on ICIC Enhancements for EPDCCH in small cell | LG Electronics | Noted |
R1‑132238 | Analysis and observations on cell association with actual cell loading | LG Electronics | Noted |
R1‑132239 | Discussion on small cell discovery enhancements | LG Electronics | Not treated |
R1‑132240 | RAN1 issues for support of dual connectivity with small cell | LG Electronics | Not treated |
R1‑132241 | Summary of Email discussion [72bis-19] on PL_b for LOS and 3D UMi PL | LG Electronics | Not treated |
R1‑132242 | Initial evaluation results based on height-dependent UE modeling | LG Electronics | Not treated |
R1‑132243 | Antenna modeling for 3D channel studies | LG Electronics | Not treated |
R1‑132244 | Discussion on 3D-channel modeling | LG Electronics | Revised |
R1‑132245 | Remaining Issues on D2D Evaluation Scenarios | LG Electronics | Not treated |
R1‑132246 | UE Power Consumption Modeling for D2D Performance Evaluation | LG Electronics | Not treated |
R1‑132247 | Channel Models for D2D Evaluation | LG Electronics | Noted |
R1‑132248 | Device Discovery in Network Coverage | LG Electronics | Noted |
R1‑132249 | Device Discovery Outside and Partial Network Coverage | LG Electronics | Noted |
R1‑132250 | Physical Layer Enhancements for D2D Communication | LG Electronics | Not treated |
R1‑132251 | Channels of interest for NAIC | LG Electronics | Not treated |
R1‑132252 | Discussions on MU-CSI | ITRI | Not treated |
R1‑132253 | HARQ feedback issue in TDD eIMTA system | ITRI | Not treated |
R1‑132254 | HARQ timeline for TDD eIMTA | ITRI | Revised |
R1‑132255 | Decoding techinique of PBCH for low-cost MTC devices | ITRI | Revised |
R1‑132256 | PBCH coverage extension for MTC devices | ITRI | Not treated |
R1‑132257 | Evaluation of eIMTA with dual CSI feedbacks in macro-pico adjacent channel deployment scenario with dense small cells | ITRI | Not treated |
R1‑132258 | Performance evaluation of interference avoidance and coordination for small cells | ITRI | Noted |
R1‑132259 | Effect of Clustered and Non-clustered Dropping on UE Connectivity | ITRI | Not treated |
R1‑132260 | Transmission Power and Range Evaluation based on RSSI level | ITRI | Not treated |
R1‑132261 | A Survey of Device to Device Discovery Approaches and the Associated Analysis for Power Consumption Approaches and LTE PHY Impacts | ITRI | Not treated |
R1‑132262 | Discussion on the scenarios for standalone NCT | Hitachi Ltd | Not treated |
R1‑132263 | Discussion on uplink aspect for carrier aggregated NCT | Hitachi Ltd | Not treated |
R1‑132264 | Evaluation of CSI feedback enhancements for MU-MIMO | Hitachi Ltd | Not treated |
R1‑132265 | Control signaling considerations for small cell DTX | Hitachi Ltd | Not treated |
R1‑132266 | Evaluation on 256QAM in small cell scenario | Hitachi Ltd | Revised |
R1‑132267 | Reactivation of dormant eNBs in small cell DTX | Hitachi Ltd | Noted |
R1‑132268 | Initial calibration results for UMa scenarios | Hitachi Ltd | Withdrawn |
R1‑132269 | DPCH Slot Format Optimization Performance Update | MediaTek Inc. | Noted |
R1‑132270 | Early Termination Performance Update | MediaTek Inc. | Noted |
R1‑132271 | Time Division Multiplexing Feature Performance Update | MediaTek Inc. | Noted |
R1‑132272 | Early Termination ACK Channel Investigation | MediaTek Inc. | Noted |
R1‑132273 | Signaling support for TDD eIMTA | MediaTek Inc. | Not treated |
R1‑132274 | Discussion on differences in behaviors between fixed and flexible subframes | MediaTek Inc. | Not treated |
R1‑132275 | Legacy UEs support in TDD eIMTA | MediaTek Inc. | Not treated |
R1‑132276 | Further results on PBCH coverage gain versus repetitions for MTC UEs | MediaTek Inc. | Not treated |
R1‑132277 | Conclusion and recommendations on MTC coverage enhancement | MediaTek Inc. | Not treated |
R1‑132278 | Evaluation results for small cell DTX | MediaTek Inc. | Withdrawn |
R1‑132279 | Performance comparison for cell association schemes | MediaTek Inc. | Withdrawn |
R1‑132280 | Performance evaluation for small cell discovery using legacy schemes | MediaTek Inc. | Not treated |
R1‑132281 | Performance evaluation for small cell discovery using new schemes based on CSI-RS and PRS | MediaTek Inc. | Not treated |
R1‑132282 | Draft TR 36.863 to include agreements from RAN1#72bis | MediaTek Inc. | Noted |
R1‑132283 | Effect of simulated loading levels on interference characteristics | MediaTek Inc. | Not treated |
R1‑132284 | On the modeling of baseline MMSE-IRC receivers under TM10 | MediaTek Inc. | Not treated |
R1‑132285 | Interference and desired channels of interest under different operational conditions | MediaTek Inc. | Not treated |
R1‑132286 | CR on SCell activation timing | Nokia Siemens Networks, Nokia, NTT DOCOMO | Noted - Revised |
R1‑132287 | Clarification on DL DAI usage in inter-band TDD CA | Nokia Siemens Networks, Nokia, ZTE, CMCC, Ericsson, ST-Ericsson, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Research In Motion UK Limited, CATT, Renesas Mobile Europe Ltd, Samsung, Intel Corporation, Huawei, HiSilicon | Noted - Revised |
R1‑132288 | Scenarios for Stand-Alone NCT | Nokia Siemens Networks, Nokia | Noted |
R1‑132289 | On Stand-Alone NCT and TDD | Nokia Siemens Networks, Nokia | Not treated |
R1‑132290 | Rank 1-2 codebook design for further downlink MIMO enhancement | Nokia Siemens Networks, Nokia | Revised |
R1‑132291 | Rank 3-4 codebook design for further downlink MIMO enhancement | Nokia Siemens Networks, Nokia | Not treated |
R1‑132292 | Considerations on MU-CSI | Nokia Siemens Networks, Nokia | Not treated |
R1‑132293 | Details of CSI feedback modes | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑132294 | Cell clustering interference mitigation for dynamic TDD UL/DL reconfiguration | Nokia, Nokia Siemens Networks | Not treated |
R1‑132295 | Enhanced uplink power control for dynamic TDD UL/DL reconfiguration | Nokia, Nokia Siemens Networks | Not treated |
R1‑132296 | On CSI measurements for eIMTA | Nokia Siemens Networks, Nokia | Not treated |
R1‑132297 | On signalling mechanisms to support dynamic TDD UL-DL reconfiguration | Nokia Siemens Networks, Nokia | Not treated |
R1‑132298 | Reference configuration method for dynamic UL-DL reconfiguration | Nokia Siemens Networks, Nokia | Not treated |
R1‑132299 | Conclusions from coverage enhancement study for MTC | Nokia Siemens Networks, Nokia | Noted |
R1‑132300 | On PDCCH-less subframes - PDSCH/EPDCCH starting in Symbol#0 | Nokia, Nokia Siemens Networks | Noted |
R1‑132301 | HARQ considerations in multi-subframe scheduling | Nokia, Nokia Siemens Networks | Noted |
R1‑132302 | Control channel usage and overhead reduction potential in FTP traffic model | Nokia, Nokia Siemens Networks | Noted |
R1‑132303 | Impairments Impact on 256QAM DL performance in LTE | Nokia, Nokia Siemens Networks | Noted |
R1‑132304 | Enhanced Fast ABS Adaptation for Rel-12 Small Cell Scenario 1 | Nokia Siemens Networks, Nokia | Noted |
R1‑132305 | Operational Carrier Selection for Rel-12 Small Cells | Nokia Siemens Networks, Nokia | Noted |
R1‑132306 | Interference coordination for EPDCCH | Nokia Siemens Networks, Nokia | Noted |
R1‑132307 | Considerations of eNB Dormancy for Small Cell Scenarios | Nokia Siemens Networks, Nokia | Noted |
R1‑132308 | On Legacy Inter-Frequency Small Cell Discovery for Scenario #2 | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑132309 | Considerations on small cell discovery | Nokia, Nokia Siemens Networks | Not treated |
R1‑132310 | On physical layer aspects of dual connectivity | Nokia Siemens Networks, Nokia | Not treated |
R1‑132311 | TP for TR on 3D channel model | Nokia Siemens Networks, Nokia | Agreed |
R1‑132312 | Remaining Antenna Modeling Issues and Initial Calibration | Nokia Siemens Networks, Nokia | Revised |
R1‑132313 | Remaining details of Pathloss | Nokia Siemens Networks, Nokia | Not treated |
R1‑132314 | Detailed 3D Channel Model | Nokia Siemens Networks, Nokia | Not treated |
R1‑132315 | Remaining issues of Device to Device evaluation assumptions | Nokia, Nokia Siemens Networks | Not treated |
R1‑132316 | Device to Device Channel Model | Nokia, Nokia Siemens Networks | Noted |
R1‑132317 | D2D discovery | Nokia, Nokia Siemens Networks | Not treated |
R1‑132318 | D2D communication | Nokia, Nokia Siemens Networks | Not treated |
R1‑132319 | On remaining scenario details for NAICS | Nokia, Nokia Siemens Networks | Not treated |
R1‑132320 | On Channels of Interest for NAICS Investigations | Nokia, Nokia Siemens Networks | Not treated |
R1‑132321 | Collaborative CSI measurements in dense deployments | IAESI | Not treated |
R1‑132322 | Aspects of the decision process for D2D communication | Czech Technical University in Prague, IAESI | Not treated |
R1‑132323 | Link-level simulation results for standalone S-UMTS downlink | China Unicom | Noted |
R1‑132324 | Draft TR 25.701 of scalable UMTS FDD bandwidth | China Unicom | Noted |
R1‑132325 | Text Proposal on Scenarios of TR 25.701 | China Unicom | Noted - Revised |
R1‑132326 | Correction to bit padding of DCI format 1A for secondary cell without uplink component carrier | NEC Group | Revised |
R1‑132327 | Handling the collision between PRS and EPDCCH | NEC Group | Not treated |
R1‑132328 | Resolving the collision between PSS/SSS and DM-RS | NEC Group | Not treated |
R1‑132329 | On the 4TX Codebook Enhancement | NEC Group | Revised |
R1‑132330 | Discussions on interference mitigation scheme in TDD eIMTA | NEC Group | Not treated |
R1‑132331 | Reconfiguration signalling for TDD eIMTA system | NEC Group | Not treated |
R1‑132332 | HARQ-timing for TDD eIMTA system | NEC Group | Not treated |
R1‑132333 | Backward compatibility for TDD eIMTA system | NEC Group | Not treated |
R1‑132334 | Downlink Reference Signal Enhancement for Low Cost MTC | NEC Group | Not treated |
R1‑132335 | Uplink Reference Signal Enhancement for Low Cost MTC | NEC Group | Not treated |
R1‑132336 | Multi-subframe and cross-subframe scheduling in small cells | NEC Group | Not treated |
R1‑132337 | Cell Selection on Dual Connectivity for Small Cells | NEC Group | Not treated |
R1‑132338 | Performance evaluation for small cell scenario 2a | NEC Group | Noted |
R1‑132339 | Discussion on antenna modeling and initial calibration of channel model | NEC Group | Not treated |
R1‑132340 | Consideration on further issues of extending the ITU-R channel model | NEC Group | Not treated |
R1‑132341 | Channel modelling for D2D | NEC Group | Noted |
R1‑132342 | D2D discovery aspects | NEC Group | Not treated |
R1‑132343 | Initial considerations on D2D communication | NEC Group | Not treated |
R1‑132344 | Further discussion on the NAICS Scenarios | NEC Group | Not treated |
R1‑132345 | Resource fragmentation caused by ePDCCH sets | NEC Group | Not treated |
R1‑132346 | DRAFT Reply LS on Additional Channel Models for MIMO Performance Characterization | Sharp, NTT DOCOMO | Noted |
R1‑132347 | Benefits of standalone NCT | Sharp | Revised |
R1‑132348 | Evaluation of benefits for standalone NCT | Sharp | Revised |
R1‑132349 | Implementation complexity for supporting inter-band CA | Sharp | Noted |
R1‑132350 | DL power control based interference mitigation for eIMTA | Sharp | Not treated |
R1‑132351 | UL power control based interference mitigation for eIMTA | Sharp | Noted |
R1‑132352 | On CSI measurement for eIMTA | Sharp | Not treated |
R1‑132353 | Comparison between explicit and implicit signaling for eIMTA reconfiguration / subframe direction | Sharp | Not treated |
R1‑132354 | HARQ-ACK timing and configuration of eIMTA cell | Sharp | Not treated |
R1‑132355 | Issues Regarding PRBs Containing PSS/SSS | NTT DOCOMO | Noted |
R1‑132356 | Issues Regarding Rel-12 Stand-Alone NCT | NTT DOCOMO | Noted |
R1‑132357 | Further Evaluations on DL 4-Tx Codebook Enhancement | NTT DOCOMO | Not treated |
R1‑132358 | Investigation of Uplink Power Control for eIMTA Interference Mitigation | NTT DOCOMO | Not treated |
R1‑132359 | HARQ design for eIMTA | NTT DOCOMO | Not treated |
R1‑132360 | Views on Cell Association Between Macro and Small Cell Layers | NTT DOCOMO | Revised |
R1‑132361 | Performance Evaluation of Load Balancing for SCE | NTT DOCOMO | Revised |
R1‑132362 | Performance Evaluation of ICIC with DL Transmission Power Adaptation for SCE | NTT DOCOMO | Revised |
R1‑132363 | Performance of multi-cell power control for uplink interference mitigation | NTT DOCOMO | Noted |
R1‑132364 | Views on Remaining Issues of Small Cell Discovery Evaluation | NTT DOCOMO | Not treated |
R1‑132365 | Performance Evaluation for Small Cell Discovery | NTT DOCOMO | Not treated |
R1‑132366 | Views on radio-IF based synchronization mechanisms | NTT DOCOMO | Revised |
R1‑132367 | Number of cell IDs for dense small cell deployments | NTT DOCOMO | Not treated |
R1‑132368 | Physical Layer Design for Dual Connectivity | NTT DOCOMO | Not treated |
R1‑132369 | Views on 3D-Channel Model for Elevation Beamforming and FD-MIMO | NTT DOCOMO | Noted |
R1‑132370 | Initial System-level Evaluation for D2D Discovery | NTT DOCOMO | Not treated |
R1‑132371 | Initial Views on Unified Approach for D2D Discovery | NTT DOCOMO | Noted |
R1‑132372 | Remaining Issues Regarding NAICS Scenarios | NTT DOCOMO | Not treated |
R1‑132373 | The Combination of CCIM and Power control for eIMTA | Coolpad | Not treated |
R1‑132374 | Discussion on control signaling overhead reduction | Coolpad | Not treated |
R1‑132375 | Discussion on Utilizing Rank Relativity to Reduce Feedback Overhead | Coolpad | Withdrawn |
R1‑132376 | Consideration on radio-interface based synchronization | Research In Motion UK Limited | Not treated |
R1‑132377 | Enhancement of frequency domain power control for EPDCCH | Research In Motion UK Limited | Noted |
R1‑132378 | Further study on techniques for interference avodiance ^^and coordination for small cell | Research In Motion UK Limited | Not treated |
R1‑132379 | Further discussion on standalone NCT in Rel-12 | Research In Motion UK Limited | Not treated |
R1‑132380 | Discussion on options to handle DMRS collision with PSS/SSS | Research In Motion UK Limited | Not treated |
R1‑132381 | Other design aspects of standalone NCT | Research In Motion UK Limited | Not treated |
R1‑132382 | In Band Interference Impacts on Proximity Services | Research In Motion UK Limited | Not treated |
R1‑132383 | Comparison of channel models for D2D evaluation | Research In Motion UK Limited | Not treated |
R1‑132384 | System level performance of proximity discovery using SRS and PRACH | Research In Motion UK Limited | Revised |
R1‑132385 | Discussion on control alternatives for D2D communication | Research In Motion UK Limited | Not treated |
R1‑132386 | HARQ design in TDD eIMTA | Research In Motion UK Limited | Not treated |
R1‑132387 | Remaining details of scenarios and interference conditions for NAICS | Research In Motion UK Limited | Not treated |
R1‑132388 | Signalling in Support of the Network-Based Solutions | Research In Motion UK Limited | Noted |
R1‑132389 | RRM Aspects of Network Assisted Interference Cancellation | Research In Motion UK Limited | Noted |
R1‑132390 | Discussion on shadow fading for UE-UE channel models | Intel Corporation | Not treated |
R1‑132391 | UL Control Enhancements for Small Cell Environments | Intel Corporation | Not treated |
R1‑132392 | Discussion on backhaul signalling and inter-eNB measurements to support DL-UL interference mitigation schemes | Intel Corporation | Not treated |
R1‑132393 | Evaluation of 256QAM for small cell deployments | Intel Corporation | Noted |
R1‑132394 | Considerations on reduced CRS transmission on NCT based on LS response from RAN4 | Huawei, HiSilicon | Not treated |
R1‑132395 | RRM measurements for NCT | Huawei, HiSilicon | Not treated |
R1‑132396 | On the backwards compatibility of the new carrier type | Huawei, HiSilicon | Not treated |
R1‑132397 | Aspects of the synchronized carrier case | Huawei, HiSilicon | Not treated |
R1‑132398 | EPDCCH transmission in PRBs with PSS/SSS | Huawei, HiSilicon | Not treated |
R1‑132399 | Further aspects of NCT | Huawei, HiSilicon | Not treated |
R1‑132400 | EPHICH design for NCT | Huawei, HiSilicon | Not treated |
R1‑132401 | Usage for shortest DwPTS in TDD special subframes on NCT | Huawei, HiSilicon | Not treated |
R1‑132402 | Analysis of codebook for rank 3-4 | Huawei, HiSilicon | Noted |
R1‑132403 | Discussion on MU-CSI | Huawei, HiSilicon | Not treated |
R1‑132404 | Discussion on eNB-to-eNB interference signalling for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132405 | CCIM for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132406 | UL power control for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132407 | CSI enhancements for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132408 | Discussion on flexible and fixed subframes in TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132409 | HARQ timing design for TDD eIMTA | Huawei, HiSilicon | Not treated |
R1‑132410 | Considerations on acquiring the amount of coverage improvement for Low-Cost MTC UEs | Huawei, Hisilicon | Agreed |
R1‑132411 | Coordinated scheduling and beamforming with non-ideal backhaul | Huawei, HiSilicon | Not treated |
R1‑132412 | Evaluations of legacy PSS/SSS/CRS for small cell discovery | Huawei, HiSilicon | Not treated |
R1‑132413 | Considerations for PHY discovery signal design | Huawei, HiSilicon | Noted |
R1‑132414 | Discussion on support of TDD special subframes in NCT | CATR | Not treated |
R1‑132415 | Simulation results for CCIM with non-ideal backhaul | CATR | Revised |
R1‑132416 | Views on signalling mechanisms for TDD UL-DL reconfiguration | CATR | Not treated |
R1‑132417 | Considerations and simulation results for downlink 256QAM | CATR | Not treated |
R1‑132418 | Discussion on synchronization enhancement for SCE | CATR | Not treated |
R1‑132419 | Comparison of 4 Tx codebook for rank1 and rank2 | CATR | Not treated |
R1‑132420 | 25.212 CR0320 (Rel-11, F) Clarification of HS-SCCH orders with the UE is configured in Multiflow and CLTD | Qualcomm Inc. | Noted - Revised |
R1‑132421 | TP on Range Expansion Results Using Macro Power Reduction | Qualcomm Inc. | Noted - Revised |
R1‑132422 | TP on Adaptive LPN UL Padding in Co-channel HetNets Deployment | Qualcomm Inc. | Agreed |
R1‑132423 | TP on Solutions for Mitigating the Impact of UL Interference for UEs in the Strong Imbalance Zone | QUALCOMM Incorporated, Nokia Siemens Networks | Noted - Revised |
R1‑132424 | Updated Results On Downlink System Performance of Hetnets in Co-channel Scenarios with Bursty traffic | Qualcomm Inc. | Noted |
R1‑132425 | Updated Results on Performance of DL Control Channels in Co-channel Hetnet Scenarios | Qualcomm Inc. | Noted |
R1‑132426 | Impact of LPN UL Padding on UL performance in Co-Channel Deployments | Qualcomm Inc. | Noted |
R1‑132427 | Updated Results on Uplink System Performance of Hetnets in Co-channel Scenarios with Bursty traffic | Qualcomm Inc. | Noted |
R1‑132428 | Downlink System Performance of Hetnets in Co-channel Scenarios with Multiflow | Qualcomm Inc. | Noted |
R1‑132429 | Further Considerations on Network Assisted IC | Qualcomm Inc. | Noted |
R1‑132430 | Impact of Combined Cell Operation on Legacy Users in SFN mode | Qualcomm Inc. | Noted |
R1‑132431 | Performance of Rel-12 UEs in Spatial Reuse Mode | Qualcomm Inc. | Noted |
R1‑132432 | Link analysis of downlink DCH enhancements | Qualcomm Inc. | Noted |
R1‑132433 | Link analysis of uplink DCH enhancements | Qualcomm Inc. | Noted |
R1‑132434 | Link Performance of DL VoHS | Qualcomm Inc. | Noted |
R1‑132435 | Link Perfomance of UL VoHS | Qualcomm Inc. | Noted |
R1‑132436 | Design considerations on ACK channel for DL FET | Qualcomm Inc. | Noted |
R1‑132437 | Performance of ACK Channel for DL FET | Qualcomm Inc. | Noted |
R1‑132438 | UE Modem Gating Analysis due to DCH Enhancements | Qualcomm Inc. | Noted |
R1‑132439 | Downlink System Performance of DCH Enhancements | Qualcomm Inc. | Noted |
R1‑132440 | Uplink System Performance of DCH Enhancements | Qualcomm Inc. | Noted |
R1‑132441 | Downlink System Performance of VoHS | Qualcomm Inc. | Withdrawn |
R1‑132442 | Uplink System Performance of VoHS | Qualcomm Inc. | Withdrawn |
R1‑132443 | TP on Uplink DCH enhancements | Qualcomm Inc. | Revised |
R1‑132444 | TP on Downlink DCH enhancements | Qualcomm Inc. | Revised |
R1‑132445 | TP on all simulation assumptions related to the DCH enhancements | Qualcomm Inc. | Revised |
R1‑132446 | TP on Time Dilation Solution for S-UMTS | Qualcomm Inc. | Noted - Revised |
R1‑132447 | Downlink Link Evaluation Results for Data Transmissions in Standalone Scalable UMTS | Qualcomm Inc. | Noted |
R1‑132448 | Downlink Link Evaluation Results for Data Transmissions in Multicarrier Scalable UMTS | Qualcomm Inc. | Noted |
R1‑132449 | Link Evaluation Results for AMR 12.2kbps for Standalone Scalable UMTS | Qualcomm Inc. | Withdrawn |
R1‑132450 | Uplink Link Evaluation Results for Data Transmissions in Scalable UMTS | Qualcomm Inc. | Noted |
R1‑132451 | System Analysis of Scalable UMTS | Qualcomm Inc. | Noted |
R1‑132452 | P-CCPCH Latency and Coverage Analysis for Time Dilation Solution | Qualcomm Inc. | Noted |
R1‑132453 | TCP over HSPA Latency and Coverage Analysis for Time Dilation Solution | Qualcomm Inc. | Noted |
R1‑132454 | S-UMTS Specification Impacts | Qualcomm Inc. | Noted |
R1‑132455 | Access and Radio Bearer Setup Latency Analysis for Time Dilation in S-UMTS | Qualcomm Inc. | Noted |
R1‑132456 | Consideration on Dedicated Secondary Carrier | Qualcomm Inc. | Noted |
R1‑132457 | Fast Carrier Hopping for Load Balancing | Qualcomm Inc. | Not treated |
R1‑132458 | On the assumptions and evaluation metrics for D2D scenarios | Ericsson, ST-Ericsson | Noted |
R1‑132459 | On D2D communication modes | Ericsson, ST-Ericsson | Not treated |
R1‑132460 | An Energy Efficient Framework for Discovery in Small Cells | Broadcom Corporation | Not treated |
R1‑132461 | Prioritization for Channels of Interest for NAICS | Broadcom Corporation | Not treated |
R1‑132462 | Comparison of spatial and isotropic channel models | Motorola Mobility | Revised |
R1‑132463 | Draft LS response on additional channel models for MIMO performance characterization | Motorola Mobility | Revised |
R1‑132464 | Scenarios and Evaluation of Standalone NCT | Motorola Mobility | Noted |
R1‑132465 | Remaining details of enhanced 4Tx codebook | Motorola Mobility | Not treated |
R1‑132466 | MU-CQI and other remaining details of CSI feedback | Motorola Mobility | Not treated |
R1‑132467 | Further considerations on MTC coverage enhancement | Motorola Mobility | Not treated |
R1‑132468 | Polarization modeling considerations for 3D MIMO | Motorola Mobility | Not treated |
R1‑132469 | Downlink performance of UMTS Heterogeneous Network in co-channel deployment with Bursty traffic | CHTTL | Noted |
R1‑132470 | Downlink performance of SF-DC in UMTS Heterogeneous Network | CHTTL | Noted |
R1‑132471 | Discussion of cell activation timing | Qualcomm Inc. | Not treated |
R1‑132472 | Discussion of eMBMS support in NCT | Qualcomm Inc. | Not treated |
R1‑132473 | Maximum allowed UL timing difference | Qualcomm Inc. | Noted |
R1‑132474 | Draft CR On antenna port definitions | Qualcomm Inc. | Noted |
R1‑132475 | Resolving ambiguous UE capability signaling for CoMP | Qualcomm Inc. | Noted |
R1‑132476 | Draft CR on resolving ambiguous UE capability signaling for CoMP | Qualcomm Inc. | Noted - Revised |
R1‑132477 | On collision between an EPDCCH decoding candidate and PSS/SSS/PBCH | Qualcomm Inc. | Noted |
R1‑132478 | Draft CR on SCell activation | Qualcomm Inc. | Not treated |
R1‑132479 | Discussion of handling PSS/SSS collision with DM-RS | Qualcomm Inc. | Not treated |
R1‑132480 | Standalone NCT | Qualcomm Inc. | Noted |
R1‑132481 | Discussion of CRS bandwidth | Qualcomm Inc. | Not treated |
R1‑132482 | Design and configuration of enhanced 4Tx codebook for Rank 1 and 2 | Qualcomm Inc. | Noted |
R1‑132483 | Design and configuration of enhanced 4Tx codebook for Rank 3 and 4 | Qualcomm Inc. | Not treated |
R1‑132484 | Details of MU-CSI feedback | Qualcomm Inc. | Noted |
R1‑132485 | Remaining issues of eMIMO CSI feedback | Qualcomm Inc. | Not treated |
R1‑132486 | Interference mitigation schemes for LTE TDD eIMTA | Qualcomm Inc. | Not treated |
R1‑132487 | DL-UL Interference mitigation scheme evaluation for LTE TDD eIMTA | Qualcomm Inc. | Not treated |
R1‑132488 | Signalling mechanisms for TDD UL-DL reconfiguration | Qualcomm Inc. | Noted |
R1‑132489 | Soft buffer management for IMTA | Qualcomm Inc. | Not treated |
R1‑132490 | General Considerations for MTC Coverage Enhancements | Qualcomm Inc. | Not treated |
R1‑132491 | Control channel overhead reduction | Qualcomm Inc. | Noted |
R1‑132492 | Higher order modulation for small cells | Qualcomm Inc. | Noted |
R1‑132493 | Interference avoidance and coordination | Qualcomm Inc. | Noted |
R1‑132494 | Small cell discovery | Qualcomm Inc. | Not treated |
R1‑132495 | Network synchronization by network listening | Qualcomm Inc. | Noted |
R1‑132496 | Dual Strip Small Cell Calibration Statistics for Scenario 2b and 3 | Qualcomm Inc. | Not treated |
R1‑132497 | Initial calibration of channel models for elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑132498 | Modifications to 3GPP Evaluation Methodology for Elevation beamforming and FD-MIMO | Qualcomm Inc. | Not treated |
R1‑132499 | TP on scenarios and metrics for TR 36.843 on D2D | Qualcomm Inc. | Revised |
R1‑132500 | Remaining details of D2D deployment scenarios and evaluation metrics | Qualcomm Incorporated, US Department Of Commerce | Noted |
R1‑132501 | Channel models for D2D deployments | Qualcomm Incorporated, US Department Of Commerce, General Dynamics Broadband UK | Noted |
R1‑132502 | Way forward for D2D channel models | Qualcomm, US Department of Commerce, General Dynamics Broadband UK, ITRI, Fujitsu, Intel, Samsung, ZTE, III | Noted |
R1‑132503 | Techniques for D2D Discovery | Qualcomm Inc. | Noted |
R1‑132504 | Techniques for D2D Communication | Qualcomm Inc. | Not treated |
R1‑132505 | Remaining details of deployment scenarios and interference conditions for NAIC | Qualcomm Inc. | Not treated |
R1‑132506 | Channel prioritization for NAIC study | Qualcomm Inc. | Not treated |
R1‑132507 | Discussion on PRBs containing PSS/SSS | Pantech | Not treated |
R1‑132508 | Further consideration on standalone NCT | Pantech | Not treated |
R1‑132509 | Discussion on QCL definition in TM10 on NCT | Pantech | Not treated |
R1‑132510 | Discussion of eMBMS on NCT | Pantech | Not treated |
R1‑132511 | Considerations on CSI-RS transmission in TDD special subframe | Pantech | Not treated |
R1‑132512 | Considerations on usage of TDD special subframe for NCT | Pantech | Not treated |
R1‑132513 | Enhanced aperiodic MU-MIMO CSI feedback in Rel. 12 | Pantech | Not treated |
R1‑132514 | Channels of interest for NAICS in Rel. 12 | Pantech | Not treated |
R1‑132515 | Link Analysis of FET ACK Indication Methods for DL FET | ZTE | Noted |
R1‑132516 | False Alarm and Miss Detection Analysis for FET ACK Indication for DL FET | ZTE | Noted |
R1‑132517 | CS Voice Service in Stand-alone S-UMTS | ZTE | Noted |
R1‑132518 | Early Termination for 10ms TTI E-DCH | ZTE | Noted |
R1‑132519 | Considerations on efficient TDM operation for HSUPA | Nokia Siemens Networks | Noted |
R1‑132520 | LLS results for Improved Rate Adaptation | Nokia Siemens Networks | Noted |
R1‑132521 | Consideration on E-DPCCH overhead reduction | Nokia Siemens Networks | Noted |
R1‑132522 | System Level simulation results for Fast Carrier Hoping | Nokia Siemens Networks | Not treated |
R1‑132523 | Pairing of Users in Enhanced R99 Voice in SHO | Nokia Siemens Networks | Noted |
R1‑132524 | Downlink system level simulation results for Voice over HSPA | Nokia Siemens Networks | Noted |
R1‑132525 | DCH Enhancements feature overview | Nokia Siemens Networks | Noted |
R1‑132526 | TP on code-space and UE power efficient SRB design | Nokia Siemens Networks | Noted |
R1‑132527 | TP on CS Voice over HSPA | Nokia Siemens Networks | Noted - Revised |
R1‑132528 | Requirmenents for Scalable UMTS system design | Nokia Siemens Networks | Noted |
R1‑132529 | Introducing E-DCH decoupling in HetNet deployments | Nokia Siemens Networks | Noted |
R1‑132530 | Consideration on the SIR target settings in the Multiflow | Nokia Siemens Networks | Noted |
R1‑132531 | Methods to mitigate LPN UL interference from macro Ues located in Strong Mismatch Zone | Nokia Siemens Networks | Noted |
R1‑132532 | Localisation and measurement of macro UEs in Strong Mismatch Zone | Nokia Siemens Networks | Noted |
R1‑132533 | Correction of valid downlink subframe | ASUSTeK | Noted - Revised |
R1‑132534 | Correction of PHICH resource for half duplex TDD UE | ASUSTeK | Noted - Revised |
R1‑132535 | Inter-cell synchronization enhancement in SCE | ASUSTeK | Not treated |
R1‑132536 | PDSCH coverage improvement for MTC with convolutional coded differential modulation | III | Revised |
R1‑132537 | PUSCH coverage improvement through spreading code for Low cost MTC | III | Not treated |
R1‑132538 | RF transceiver impact for a higher order modulation scheme | III | Noted |
R1‑132539 | SQNR impact for higher order modulation scheme | III | Revised |
R1‑132540 | Discussion on network assisted D2D discovery | III | Not treated |
R1‑132541 | Evaluations of D2D discovery schemes | III | Not treated |
R1‑132542 | Framework for 3D channel model | CMCC, CATT | Not treated |
R1‑132543 | UMa channel measurement results on elevation related parameters | CMCC, CATT | Noted |
R1‑132544 | O2I channel measurement results on elevation related parameters | CMCC | Not treated |
R1‑132545 | Discussion on SS in NCT | CMCC | Not treated |
R1‑132546 | Link level simulation results for higher order modulation | CMCC | Noted |
R1‑132547 | Procedures for efficient discovery of small cells | CMCC | Not treated |
R1‑132548 | Discussion on air-interface based synchronization for small cell enhancement | CMCC | Noted |
R1‑132549 | Discussion on time scale and HARQ timeline for TDD eIMTA | CMCC | Not treated |
R1‑132550 | Discussion on small cell architecture to support efficient operation | CMCC | Not treated |
R1‑132551 | Discussion on signalling mechanisms for eIMTA | Potevio | Not treated |
R1‑132552 | Discussion on measurement and HARQ timeline issues for eIMTA | Potevio | Not treated |
R1‑132553 | TDD special subframe handling in NCT | Potevio | Not treated |
R1‑132554 | Multi-subframe scheduling and cross-subframe scheduling | Potevio | Not treated |
R1‑132555 | MU-CSI for flexible co-scheduling more than 2 UEs | ETRI | Not treated |
R1‑132556 | Discussion on D2D discovery | ETRI | Noted |
R1‑132557 | ProSe Communications for Outside Network Coverage | ETRI | Not treated |
R1‑132558 | CA extension in support of inter-site CA | ETRI | Not treated |
R1‑132559 | Discovery signal design based on legacy signals | ETRI | Not treated |
R1‑132560 | Simulation of ProSe Deployment Scenarios | General Dynamics Broadband UK | Noted |
R1‑132561 | ProSe UE-to-UE communication when out of network coverage | General Dynamics Broadband UK | Not treated |
R1‑132562 | Corrections on different TDD UL-DL configurations on different bands | Sharp, CATT, Ericsson, ST-Ericsson | Noted - Revised |
R1‑132563 | Mapping between the AI and the default E-DCH resource index | Huawei, HiSilicon | Noted |
R1‑132564 | 25.211 CR0313 (Rel-11,F) Clarification to the association between the AI and the default E-DCH resource index | Huawei, HiSilicon | Noted - Revised |
R1‑132565 | Summary of email discussion on system simulations for DL co-channel - Full Buffer | Huawei, HiSilicon | Noted |
R1‑132566 | Summary of email discussion on system simulations for co-channel - UL and Bursty Traffic | Huawei, HiSilicon | Noted |
R1‑132567 | Text Proposal on RRS on TF | Huawei, HiSilicon | Noted |
R1‑132568 | Text Proposal on the use of CIO and noise padding in Hetnets | Huawei, HiSilicon | Noted |
R1‑132569 | Further System Simulations for DL Co-channel Interference Scenario - Full Buffer | Huawei, HiSilicon | Noted |
R1‑132570 | Further System Simulations for DL Co-channel Interference Scenario - Bursty Traffic | Huawei, HiSilicon | Noted |
R1‑132571 | Further System Simulations for UL Co-channel Interference Scenario - Bursty Traffic | Huawei, HiSilicon | Noted |
R1‑132572 | ^^On the use of CIO and noise padding in Hetnets | Huawei, HiSilicon | Noted |
R1‑132573 | On the reliability of DL control channels in Hetnets | Huawei, HiSilicon | Noted |
R1‑132574 | Furhter results on HS-DPCCH performance evaluation in HetNet | Huawei, HiSilicon | Withdrawn |
R1‑132575 | On the restricted TF solution for UEs with NA-IC capability | Huawei, HiSilicon | Noted |
R1‑132576 | Initial Considerations on future study on Network Assisted IC | Huawei, HiSilicon | Noted |
R1‑132577 | Design of S-UMTS aggregation | Huawei, HiSilicon | Noted |
R1‑132578 | Link level simulation results for standalone S-UMTS | Huawei, HiSilicon | Noted |
R1‑132579 | Link level simulation results for S-UMTS CA | Huawei, HiSilicon | Noted |
R1‑132580 | Evaluation on voice capacity for standalone S-UMTS | Huawei, HiSilicon | Noted |
R1‑132581 | Analysis of latency and coverage for standalone S-UMTS | Huawei, HiSilicon | Noted |
R1‑132582 | Physical layer procedures for standalone S-UMTS | Huawei, HiSilicon | Noted |
R1‑132583 | Considerations on lean carrier | Huawei, HiSilicon | Noted |
R1‑132584 | Consideration of HS-DPCCH overhead reduction | Huawei, HiSilicon | Noted |
R1‑132585 | Consideration of E-DPCCH overhead reduction | Huawei, HiSilicon | Noted |
R1‑132586 | Text Proposal for conclusion clause of 3GPP TR 36.888 | Vodafone Group | Revised |
R1‑132587 | Update to TR 36.888 to include agreements from RAN1#72bis | Vodafone Group | Agreed |
R1‑132588 | LS on coverage improvement for Low-Cost MTC UEs based on LTE | Vodafone Group | Revised |
R1‑132589 | FE-FACH: Signatures and Resource Mapping | Ericsson, ST-Ericsson | Noted |
R1‑132590 | 25.211 CR0314 (Rel-11, F) Signature and Default Common E-DCH Resource Mapping | Ericsson, ST-Ericsson | Noted - Revised |
R1‑132591 | E-DPCCH Reduction in Multi-RAB | Ericsson, ST-Ericsson | Noted |
R1‑132592 | 25.214 CR0708 (Rel-12, B) DTX E-DPCCH when Power Scaling in Multi-RAB | Ericsson, ST-Ericsson | Agreed |
R1‑132593 | Text Proposal on Combined Cell | Ericsson, ST-Ericsson | Noted - Revised |
R1‑132594 | Downlink System Level Simulation Results in Co-Channel Deployment with Bursty Traffic | Ericsson, ST-Ericsson | Noted |
R1‑132595 | Analysis of Downlink Control Channel Performance in Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑132596 | Downlink Control Channel Perfomance with Network Assistance | Ericsson, ST-Ericsson | Noted |
R1‑132597 | Uplink System Level Simulation Results in Co-Channel Deployment with Bursty Traffic | Ericsson, ST-Ericsson | Noted |
R1‑132598 | Performance of Multiflow in UMTS Heterogeneous Networks with Bursty Traffic | Ericsson, ST-Ericsson | Noted |
R1‑132599 | Analysis of Network Assistance for Interference Cancelation for Cell Range Expansion | Ericsson, ST-Ericsson | Noted |
R1‑132600 | Considerations on Restricted Resource for Interference Cancellation | Ericsson, ST-Ericsson | Noted |
R1‑132601 | Link Evaluation of Reliable Uplink Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑132602 | Text Proposal on Further Link Evaluations of Reliable Uplink Reception for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑132603 | Overview of Spatial Reuse Mode in Combined Cell Deployment for Heterogeneous Networks | Ericsson, ST-Ericsson | Noted |
R1‑132604 | Link Level Analysis of Spatial Reuse Mode for Combined Cell Deployments with Realistic Channel Estimation | Ericsson, ST-Ericsson | Noted |
R1‑132605 | Analysis of Salient Features of Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑132606 | System Level Simulation Results in Combined Cell Deployment | Ericsson, ST-Ericsson | Noted |
R1‑132607 | Text Proposal on Downlink Control Channel Performance | Ericsson, ST-Ericsson | Noted |
R1‑132608 | Text Proposal on Range Expansion with Network Assisted Interference Cancellation | Ericsson, ST-Ericsson | Noted |
R1‑132609 | Design Aspects of Scalable UMTS | Ericsson, ST-Ericsson | Noted |
R1‑132610 | Further Details on Dedicated Secondary Carrier | Ericsson, ST-Ericsson | Noted |
R1‑132611 | Initial Link Simulation Results for Dedicated Secondary Carrier | Ericsson, ST-Ericsson | Noted |
R1‑132612 | Further Details on HSUPA Rate Adaptation | Ericsson, ST-Ericsson | Noted |
R1‑132613 | Initial Link Simulation Results for HSUPA Rate Adaptation | Ericsson, ST-Ericsson | Noted |
R1‑132614 | Further Details on CQI Report Reduction | Ericsson, ST-Ericsson | Noted |
R1‑132615 | Power control optimization in wind up situation | Telefonica | Revised |
R1‑132616 | Need for minimising UL control channel overhead for HSPA | Vodafone Group | Withdrawn |
R1‑132617 | Impact of polarization modeling on correlation | Anite, Elektrobit | Withdrawn |
R1‑132618 | 3D-Antenna Antenna Array Model | Anite, Elektrobit | Revised |
R1‑132619 | Elevation Extension of Spatial Channel Models | Anite, Elektrobit | Noted |
R1‑132620 | Clarification for IMT-Advanced LOS path definition | Anite, Elektrobit | Noted |
R1‑132621 | Technical considerations about D2D channel models | Anite, Elektrobit | Noted |
R1‑132622 | Proposal for modification of IMT-A channel model for D2D | Anite, Elektrobit | Noted |
R1‑132623 | UL System simulation results for HetNet | Nokia Siemens Networks | Noted |
R1‑132624 | An Approach for a 3D Channel Model with Time Evolution (QuaDRiGa) | Fraunhofer IIS | Revised |
R1‑132625 | Updated required system functionality for enhanced coverage MTC devices. | Fujitsu | Not treated |
R1‑132626 | Optimization of Rank 1 and Rank 2 Codebook Design for 4Tx | AT&T | Noted |
R1‑132627 | Feedback Reduction Techniques for PUSCH Mode 3-2 for 4Tx | AT&T | Not treated |
R1‑132628 | Dormant Small Cell Discovery | ETRI | Not treated |
R1‑132629 | Considerations on Small Cell Discovery | ETRI | Not treated |
R1‑132630 | PDSCH coverage improvement for MTC with convolutional coded differential modulation | III | Not treated |
R1‑132631 | SQNR impact for higher order modulation scheme | III | Not treated |
R1‑132632 | Further study on the performance and backhaul signaling requirements for CCIM | CATT | Not treated |
R1‑132633 | Further study on the uplink power control | CATT | Noted |
R1‑132634 | Further Performance evaluation of standalone NCT | Huawei, HiSilicon | Noted |
R1‑132635 | Considerations on CRS population in NCT | Intel Corporation | Withdrawn |
R1‑132636 | System performance evaluation of small cells Scenario 2a | InterDigital | Noted |
R1‑132637 | Simulation results for CCIM with non-ideal backhaul | CATR | Not treated |
R1‑132638 | 3GPP internal LS on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | ITU-R Ad hoc, Telecom Italia | Noted |
R1‑132639 | Control signaling enhancements for small cells | Samsung | Noted |
R1‑132640 | 36.212 DraftCR (Rel-10, F) Correction to bit padding of DCI format 1A for secondary cell without uplink component carrier | NEC Group | Noted - Revised |
R1‑132641 | 36.212 DraftCR (Rel-11, A) Correction to bit padding of DCI format 1A for secondary cell without uplink component carrier | NEC Group | Noted - Revised |
R1‑132642 | Path Loss for 3D Channel Modeling | Broadcom Corporation | Noted |
R1‑132643 | HARQ timeline for TDD eIMTA | ITRI | Not treated |
R1‑132644 | Rank 1-2 performance of double codebook for four DL antenna ports | Renesas Mobile Europe Ltd | Noted |
R1‑132645 | Lab evaluation of DL AMR12.2k on R99DCH in ITU channels | Qualcomm Inc. | Not treated |
R1‑132646 | Final Report of RAN1#72bis meeting | MCC | Approved |
R1‑132647 | Comparison of spatial and isotropic channel models | Motorola Mobility | Noted |
R1‑132648 | Draft LS response on additional channel models for MIMO performance characterization | Motorola Mobility, Anite Telecoms, Elektrobit, Intel | Noted |
R1‑132649 | 3D-Antenna Antenna Array Model | Anite, Elektrobit | Not treated |
R1‑132650 | Simulation results on small cell discovery | Renesas Mobile Europe Ltd | Not treated |
R1‑132651 | Remaining Antenna Modeling Issues and Initial Calibration | Nokia Siemens Networks, Nokia | Not treated |
R1‑132652 | Evaluation on 256QAM in small cell scenario | Hitachi Ltd | Noted |
R1‑132653 | Physical layer considerations on D2D discovery | HTC | Not treated |
R1‑132654 | Physical layer considerations on D2D communication | HTC | Not treated |
R1‑132655 | Benefits of standalone NCT | Sharp | Not treated |
R1‑132656 | Evaluation of benefits for standalone NCT | Sharp | Noted |
R1‑132657 | On the 4TX Codebook Enhancement | NEC Group | Not treated |
R1‑132658 | System level performance of proximity discovery using SRS and PRACH | Research In Motion UK Limited | Not treated |
R1‑132659 | Performance analysis and standard impacts of downlink control signaling enhancements | Huawei, HiSilicon | Noted |
R1‑132660 | Spectral efficiency gains with the standalone NCT | Ericsson,ST-Ericsson | Noted |
R1‑132661 | Draft LS on Proposal of Additional Channel Models for MIMO Performance Characterization | Motorala Mobility | Revised |
R1‑132662 | 36.213 CR0419 (Rel-10, F) CR on SCell activation timing | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | Noted - Revised |
R1‑132663 | TP for Section 7.1.2 and 7.1.3 on potential solutions in 7.1 Solutions for co-channel scenarios | Nokia Siemens Networks | Noted - Revised |
R1‑132664 | PSD boosting performance evaluation of PRACH for TR36.888 | ZTE | Noted |
R1‑132665 | [Draft] Reply to LS on UE SCell activation delay in CA | Nokia Siemens Networks | Noted - Revised |
R1‑132666 | 36.211 CR0182 (Rel-11, F) Correction to EPDCCH PRB pair indication | Texas Instruments | Agreed |
R1‑132667 | Views on Cell Association Between Macro and Small Cell Layers | NTT DOCOMO | Noted |
R1‑132668 | Performance Evaluation of Load Balancing for SCE | NTT DOCOMO | Noted |
R1‑132669 | 36.212 CR0150 (Rel-11, F) Correction on ARO bit setting for DL DCIs carried by EPDCCH | CATT, Texas Instruments | Agreed |
R1‑132670 | 36.212 CR0151 (Rel-11, F) Clarification on DL DAI usage in inter-band TDD CA | Nokia Siemens Networks, Nokia, ZTE, CMCC, Ericsson, ST-Ericsson, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Research In Motion UK Limited, CATT, Renesas Mobile Europe Ltd, Samsung, Intel Corporation, Huawei, HiSilicon | Agreed |
R1‑132671 | 36.212 CR0152 (Rel-10, F) Correction to bit padding of DCI format 1A for secondary cell without uplink component carrier | NEC Group | Agreed |
R1‑132672 | 36.212 CR0153 (Rel-11, A) Correction to bit padding of DCI format 1A for secondary cell without uplink component carrier | NEC Group | Agreed |
R1‑132673 | 36.213 CR0417r1 (Rel-11, F) Correction to PUSCH/PUCCH transmit power after PRACH power ramping | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, AT&T, Ericsson,ST-Ericsson | Agreed |
R1‑132674 | Discussion on 3D channel model extension | InterDigital | Not treated |
R1‑132675 | 36.213 CR0420 (Rel-11, F) Correction on UE-specific RS scrambling for SPS PDSCH in TM10 | Intel Corporation | Agreed |
R1‑132676 | 36.213 CR0421 (Rel-11, F) CR on resolving ambiguous UE capability signaling for CoMP | Qualcomm Inc. | Agreed |
R1‑132677 | Correction on MBSFN subframe configuration | LG Electronics, Huawei, HiSilicon, Panasonic, Renesas Mobile Europe LtdLG Electronics, Huawei, HiSilicon, Panasonic, Renesas Mobile Europe Ltd | Noted - Revised |
R1‑132678 | Discussion on 3D-channel modeling | LG Electronics | Not treated |
R1‑132679 | Views on radio-IF based synchronization mechanisms | NTT DOCOMO | Noted |
R1‑132680 | Performance Evaluation of ICIC with DL Transmission Power Adaptation for SCE | NTT DOCOMO | Noted |
R1‑132681 | Rank 1-2 codebook design for further downlink MIMO enhancement | Nokia Siemens Networks, Nokia | Revised |
R1‑132682 | 36.213 CR0422 (Rel-11, F) Correction of valid downlink subframe | ASUSTeK | Agreed |
R1‑132683 | 36.213 CR0423 (Rel-10, F) Correction on HARQ-ACK transmission for a UE configured with PUCCH format 3 | Intel Corporation, Qualcomm Inc., LG Electronics, Nokia Siemens Networks, Nokia | Agreed |
R1‑132684 | 36.213 CR0424 (Rel-11, A) Correction on HARQ-ACK transmission for a UE configured with PUCCH format 3 | Intel Corporation, Qualcomm Inc., LG Electronics, Nokia Siemens Networks, Nokia | Agreed |
R1‑132685 | 36.213 CR0410R1 (Rel-11, F) Corrections on different TDD UL-DL configurations on different bands | Sharp, CATT, Ericsson, ST-Ericsson, Fujitsu, ITRI | Agreed |
R1‑132686 | Performance evaluation of new 4Tx codebook: rank-1/2 | Texas Instruments | Noted |
R1‑132687 | On rank-3/4 codebook design for 4Tx | Texas Instruments | Noted |
R1‑132688 | [Draft] LS on Maximum TA difference between TAGs | LG Electronics | Noted - Revised |
R1‑132689 | 36.213 CR0425 (Rel-11, F) Correction of PHICH resource for half duplex TDD UE | ASUSTeK | Agreed |
R1‑132690 | 36.213 CR0426 (Rel-11, F) Correction on n_{HARQ} for TDD CA with different UL-DL configurations | CATT | Agreed |
R1‑132691 | 36.213 CR0427 (Rel-11, F) Correction on implicit HARQ-ACK resource determination for PUCCH format 1b with channel selection for TDD CA with different UL-DL configurations | CATT | Agreed |
R1‑132692 | [DRAFT] LS on EPDCCH monitoring in PRS subframe | Alcatel Lucent | Noted - Revised |
R1‑132693 | System level evaluation results and discussion on 256QAM for small cells | Samsung | Noted |
R1‑132694 | 36.211 CR0183 (Rel-11, F) CR on collision between EPDCCH and PSS/SSS/PBCH | Qualcomm Inc., LG Electronics, Panasonic | Agreed |
R1‑132695 | Way forward on the evaluation assumptions of partial and out-of-coverage scenarios | LG Electronics, LG Uplus, Qualcomm, General Dynamics Broadband UK | Noted |
R1‑132696 | Text proposal of TR 36.872 on higher order modulation for SCE | Huawei, HiSilicon | Agreed |
R1‑132697 | 25.212 CR0320r1 (Rel-11, F), Clarification of HS-SCCH orders with the UE is configured in Multiflow and CLTD | Qualcomm Inc. | Agreed |
R1‑132698 | 25.211 CR0313r1 (Rel-11, F) Signature and Default Common E-DCH Resource Mapping | Huawei, Ericsson, ST-Ericsson, HiSilicon | Agreed |
R1‑132699 | TP on Uplink DCH enhancements | Qualcomm Inc. | Agreed |
R1‑132700 | TP on Downlink DCH enhancements | Qualcomm Inc. | Agreed |
R1‑132701 | TP on all simulation assumptions related to the DCH enhancements | Qualcomm Inc. | Agreed |
R1‑132702 | TP on Solutions for Mitigating the Impact of UL Interference for UEs in the Strong Imbalance Zone | Qualcomm Inc. | Agreed |
R1‑132703 | Text Proposal on Combined Cell | Ericsson, ST-Ericsson | Agreed |
R1‑132704 | TP for Section 7.1.2 and 7.1.3 on potential solutions in 7.1 Solutions for Co-channel Scenarios | Nokia Siemens Networks, Qualcomm, Huawei, Ericsson | Agreed |
R1‑132705 | Summary of UMTS Heterogeneous Networks session | HSPA session chairman (Thomas Sälzer, Huawei) | Revised |
R1‑132706 | Text Proposal on Scenarios of TR 25.701 | China Unicom | Noted - Revised |
R1‑132707 | TP on Time Dilation Solution for S-UMTS | Qualcomm Inc. | Agreed |
R1‑132708 | TP on CS Voice over HSPA | Nokia Siemens Networks | Agreed |
R1‑132709 | Chairman's summary of the UMTS sessions 5.1, 5.2, 5.4, 5.5 and 5.6 | HSPA session chairman (Karri Ranta-aho, Nokia Siemens Networks) | Revised |
R1‑132710 | Summary of UMTS Heterogeneous Networks session | HSPA session chairman (Thomas Sälzer, Huawei) | Endorsed |
R1‑132711 | Chairman's summary of the UMTS sessions 5.1, 5.2, 5.4, 5.5 and 5.6 | HSPA session chairman (Karri Ranta-aho, Nokia Siemens Networks) | Endorsed |
R1‑132712 | [Draft] LS on scalable bandwidth UMTS | Ericsson | Noted |
R1‑132713 | Reply LS on TR for UMTS Heterogeneous Networks | RAN2, Huawei | Noted |
R1‑132714 | Specific impacts identified on Scalable-UMTS | Ericsson, ST-Ericsson | Agreed |
R1‑132715 | Simulation assumptions for Rate Adaptation performance evaluation for Further EUL Enhancements | Ericsson, ST-Ericsson | Agreed |
R1‑132716 | TP on Background and Motivation for Reduced Control Channel Overhead | Ericsson, ST-Ericsson | Agreed |
R1‑132717 | Proposal on the calibration of the D2D simulation | KDDI | Not treated |
R1‑132718 | Performance Evaluation Way Forward | Qualcomm Inc., General Dynamics Broadband UK, US Dept.of Commerce, Fujitsu, III | Noted |
R1‑132719 | TP on scenarios and metrics for TR 36.843 on D2D | Qualcomm Inc. | Agreed |
R1‑132720 | Way-forward on 4Tx codebook in Rel.12: rank-3/4 | Texas Instruments, CATT, Fujitsu, Intel, InterDigital, LG Electronics, NEC, Motorola Mobility, Qualcomm, ZTE | Agreed |
R1‑132721 | Power control optimization in wind up situation | InToTally, Telefonica | Noted |
R1‑132722 | Agreements from D2D Offline Session | Qualcomm Inc. | Agreed |
R1‑132723 | Benefits of standalone NCT | CATT | Not treated |
R1‑132724 | Evaluation of stand-alone NCT | ZTE | Noted |
R1‑132725 | Summary of evaluation results for the NCT | Ericsson | Revised |
R1‑132726 | Discovery Way Forward | Qualcomm Inc., General Dynamics Broadband UK, US Dept.of Commerce, Fujitsu, Intel, III | Noted |
R1‑132727 | Way Forward on interference mitigation in TDD eIMTA | LG Electronics, LG Uplus, Samsung, Renesas Mobile Europe, Sharp, Ericsson, ST-Ericsson | Noted |
R1‑132728 | Way Forward on RRM/RLM in TDD eIMTA | LG Electronics, LG Uplus, Renesas Mobile Europe, Ericsson, ST-Ericsson, Samsung, Sharp, CATT, NTT DOCOMO, New Postcom | Not treated |
R1‑132729 | Impact of antenna modeling on 3D-MIMO evaluation | CATT | Not treated |
R1‑132730 | An Approach for a 3D Channel Model with Time Evolution (QuaDRiGa) | Fraunhofer IIS | Not treated |
R1‑132731 | Rank 1-2 codebook design for further downlink MIMO enhancement | Nokia Siemens Networks, Nokia | Noted |
R1‑132732 | Text Proposal for alternative PBCH decoding techniques for MTC coverage improvement | Sierra Wireless, ITRI | Noted - Revised |
R1‑132733 | Way Forward on MU-CQI | Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ITRI, NEC, Samsung | Noted |
R1‑132734 | Way Forward on further details of feedback modes for Rel-12 4Tx rank 3&4 | ZTE, Intel, LG Electronics, Texas Instruments | Noted |
R1‑132735 | Initial calibration of 3D channel model and remaining issues of antenna modelling | ZTE | Not treated |
R1‑132736 | Remaining issues of new aperiodic PUSCH feedback mode | ZTE | Not treated |
R1‑132737 | Way Forward on MU-CSI | Intel Corporation, Hitachi, Pantech | Noted |
R1‑132738 | R1-132738 Way Forward of 4Tx Rank 1 and 2 Codebook Design for Downlink MIMO Enhancement in Rel-12 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Huawei, HiSilicon, ZTE, Qualcomm, LG Electronics, Intel, CATT, Fujitsu, Renesas Mobile Europe, NEC, Broadcom | Noted |
R1‑132739 | Way Forward on D2D signal transmission timing | LG Electronics, LG Uplus, Ericsson, ST-Ericsson, Huawei, HiSilicon | Noted |
R1‑132740 | Way Forward on HARQ Timing for dynamic TDD | NTT DOCOMO, Panasonic, RIM, ETRI, New Postcom | Not treated |
R1‑132741 | Way Forward on HARQ feedback timing for TDD eIMTA, | Ericsson, ST-Ericsson, LG Electronics, Sharp, ZTE, Nokia, Nokia Siemens Networks, Qualcomm | Revised |
R1‑132742 | Way Forward on Interference Mitigation for TDD eIMTA | CATT, CATR, CMCC,Huawei, HiSilicon, Intel, RIM, NEC, Potevio, New Postcom | Noted |
R1‑132743 | Further results for PBCH Correlation Decoder for MTC Coverage Improvement | Sierra Wireless | Noted |
R1‑132744 | Way Forward on Height Dependent PL | Samsung, Anite, Broadcom, CATT, CMCC, Electrobit, ETRI, Fraunhofer IIS, KDDI, LG Electronics, New Postcom, Nokia, Nokia Siemens Networks, NTT DOCOMO | Noted |
R1‑132745 | Way Forward on Fast fading Channel Model for D2D | NEC, Ericsson, ST_Ericsson, Huawei, HiSilicon | Noted |
R1‑132746 | Way Forward on MU-CSI | LG Electronics, ZTE, Ericsson, ST-Ericsson | Noted |
R1‑132747 | Way Forward on frequency-domain granularity of a new aperiodic PUSCH CSI feedback | LG Electronics, ZTE, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted |
R1‑132748 | Way Forward on Introduction of Elevation Domain Parameters in 3D Channel Modeling | NSN,Alcatel-Lucent,AlcatelLucentShanghaiBell,Anite,Broadcom,CATT,CMCC,Elektrobit,ETRI,HiSilicon,Huawei,Intel,InterDigital,KDDI,LG,MotorolaMobility,NEC,NewPostcom,Nokia,NTTDOCOMO,Orange,Qualcomm,Samsung | Noted |
R1‑132749 | Way Forward on HARQ feedback timing for TDD eIMTA, | Ericsson, ST-Ericsson, LG Electronics, Sharp, ZTE, Nokia, Nokia Siemens Networks, Qualcomm | Not treated |
R1‑132750 | Discussion on Network Operation for Partial Network Coverage | LG Electronics | Noted |
R1‑132751 | Way Forward on UE association for 3D channel studies | LG Electronics, Anite Telecoms, Elektrobit, ETRI, Intel Corporation, InterDigital, Orange, New Postcom, Nokia, Nokia Siemens Networks, Samsung, ZTE | Noted |
R1‑132752 | Way forward on generating channel coefficients | LG Electronics, ETRI, Motorola Mobility | Not treated |
R1‑132753 | On bandwidth of ESS | Ericsson,ST-Ericsson | Not treated |
R1‑132754 | Way Forward on Groupcast and Broadcast Communication | Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, Hi-Silicon, Huawei, ST-Ericsson | Noted |
R1‑132755 | Way Forward on 3D Channel Modeling | Fraunhofer IIS, Motorola Mobility, Ericsson, ST-Ericsson | Noted |
R1‑132756 | Way Forward on Modeling of Elevation Domain Parameters | CMCC, CATT, Ericsson, ST-Ericsson, NTT DoCoMo, ZTE, CATR, Samsung | Not treated |
R1‑132757 | RRC Parameter list for MIMO enhancement in Rel 12 | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted |
R1‑132758 | void | - | Withdrawn |
R1‑132759 | Way Forward on D2D Power Consumption Model | Qualcomm, Fujitsu, US Department of Commerce, General Dynamics Broadband | Noted |
R1‑132760 | Way Forward on D2D Pathloss and Shadowing | Qualcomm, Huawei, HiSilicon, ITRI, ZTE, CATT, Samsung, US Department of Commerce, General Dynamics Broadband, III | Noted |
R1‑132761 | Way Forward on D2D Doppler Modeling | Qualcomm, ANITE, Intel, Fujitsu, US Department of Commerce, General Dynamics Broadband, III | Noted - Revised |
R1‑132762 | Way Forward on D2D Shadowing Correlation | Qualcomm, Intel, US Department of Commerce, General Dynamics Broadband, III | Noted |
R1‑132763 | 36.211 CR0184 (Rel-12, B0 Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Withdrawn |
R1‑132764 | 36.212 CR0154 (Rel-12, B0 Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Withdrawn |
R1‑132765 | 36.213 CR0431 (Rel-12, B0 Introduction of Rel 12 feature for Downlink MIMO Enhancement | Alcatel Lucent, Alcatel Lucent Shanghai Bell | Withdrawn |
R1‑132766 | LS on RRC parameters needed for Further MIMO Enhancement | Alcatel Lucent | Noted - Revised |
R1‑132767 | Decoding techinique of PBCH for low-cost MTC devices | ITRI | Noted |
R1‑132768 | Text proposal for PRACH for low-cost MTC | ZTE , NSN, Nokia, Media Tek, CATT | Agreed |
R1‑132769 | Way Forward on Groupcast and Broadcast Communication | Ericsson, ST-Ericsson, ALU, ASB, Hi-Silicon, Huawei | Agreed |
R1‑132770 | [Draft] LS on coverage improvement for Low-Cost MTC UEs based on LTE | Vodafone Group | Noted - Revised |
R1‑132771 | Way Forward on Radio-interface based synchronization | Huawei, HiSilicon, KDDI, NTT DOCOMO, CMCC, CATR, Research In Motion, ASUSTeK, Telefónica, IAESI, New Postcom, Telecom Italia, Deutsche Telekom, T-Mobile USA, Coolpad | Noted |
R1‑132772 | D2D Discovery Terminology Way Forward | Qualcomm Inc., Huawei, HiSilicon, LG Electronics, LG Uplus, Intel, Samsung, NEC, RIM, ETRI | Noted |
R1‑132773 | Way Forward on Small Cell ICIC (load balancing, enhanced ICIC) | LG Electronics, Hitachi, NTT DOCOMO, Panasonic | Noted |
R1‑132774 | Reply LS on 3GPP internal LS on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | RAN3, Telecom Italia | Noted |
R1‑132775 | Text Proposal for conclusion clause of 3GPP TR 36.888 | Vodafone Group | Revised |
R1‑132776 | Way Forward on Small Cell Discovery | NTT DOCOMO, Huawei, HiSilicon, ETRI, ZTE, MediaTek, Panasonic, CMCC, LG Electronics | Noted |
R1‑132777 | Text proposal for observable diminishing returns for PBCH | Huawei, HiSilicon, MediaTek Inc., Sony Europe, CATR, CATT, Fujitsu, NSN, Nokia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑132778 | Way Forward for Small Cell On/Off | Huawei, HiSilicon, Panasonic, Samsung | Noted |
R1‑132779 | Conclusions on standalone NCT | Samsung, Broadcom, CATT, KDDI, Motorola, Nokia, Nokia Siemens Networks, Panasonic, Qualcomm, Renesas, Research in Motion | Noted |
R1‑132780 | Text Proposal for conclusion clause of 3GPP TR 36.888 | Vodafone Group | Noted - Revised |
R1‑132781 | Text Proposal for conclusion clause of 3GPP TR 36.888 | Vodafone Group | Agreed |
R1‑132782 | Text proposal for observable diminishing returns for PBCH | Huawei, HiSilicon, MediaTek Inc., Sony Europe, CATR, CATT, Fujitsu, NSN, Nokia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑132783 | Way Forward on NAICS channels of interest | Renesas Mobile Europe , Broadcom, Mediatek, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, CATT, Docomo, Hitachi, Huawei, HiSilicon, Qualcomm, NEC, New Postcom, Nokia, Nokia Siemens Networks, Orange, Panasonic, Pantech, RIM, Samsung, Sharp, ZTE | Noted |
R1‑132784 | Text proposal for alternative PBCH decoding techniques and modifications on table 9.5-1 | CATT, MediaTek Inc., Sierra Wireless, ITRI | Agreed |
R1‑132785 | Assumptions for evaluation related to small cell discovery | NTT DOCOMO, Huawei, HiSilicon, ETRI, ZTE, MediaTek, Panasonic, CMCC, LG Electronics | Agreed |
R1‑132786 | Proposal on the time scales for evaluations of small cell ON/OFF | Panasonic | Noted |
R1‑132787 | Way Forward on backhaul signalling in TDD eIMTA | Huawei, HiSilicon, CATT, CATR, CMCC, Coolpad, Intel, LGE, NEC, New Postcom, Potevio, Renesas Mobile Europe, Research in Motion, Qualcomm , Samsung, ZTE | Not treated |
R1‑132788 | Way Forward on backhaul signaling in eIMTA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, LG Electronics, Nokia Siemens Networks, ST-Ericsson, ZTE | Not treated |
R1‑132789 | Reply LS on UE SCell activation delay in CA | RAN4, Nokia Siemens Networks | Noted |
R1‑132790 | Summary of evaluation results for the NCT | Ericsson | Not treated |
R1‑132791 | Way forward on possible conclusion for standalone NCT | Ericsson, ST-Ericsson, Huawei, HiSilicon, Sharp, ZTE, Intel | Noted |
R1‑132792 | Merge of evaluation assumptions for small cell on/off and S-NCT | Ericsson, ST-Ericsson, Huawei, HiSilicon | Noted - Revised |
R1‑132793 | Summary of Ad-hoc session on Low-cost MTC UEs based on LTE | Ad-Hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑132794 | Summary of Ad-hoc session on 3D-channel model for Elevation Beamforming and FD-MIMO | Ad-Hoc Chairman (Samsung) | Endorsed |
R1‑132795 | Draft LS on the support of radio-interface based synchronization mechanisms | Qualcomm | Noted - Revised |
R1‑132796 | 36.863 v0.3.0 on Network-Assisted Interference Cancellation and Suppression for LTE | MediaTek Inc. | Agreed |
R1‑132797 | [Draft] LS on coverage improvement for Low-Cost MTC UEs based on LTE | Vodafone Group | Noted - Revised |
R1‑132798 | 36.888 v2.1.0 Update to include agreements from RAN1#73 | Vodafone Group | Agreed |
R1‑132799 | Way Forward on PRBs with PSS/SSS on NCT | Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, InterDigital, NEC, Renesas, Research in Motion, Samsung, Sharp, Texas Instruments | Noted |
R1‑132800 | Correction on PUCCH power control | LG Electronics | Not treated |
R1‑132801 | Suggestion on PUCCH power control based on off line discussion | LG Electronics | Noted |
R1‑132802 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | Ad-Hoc Chairman (Samsung) | Endorsed |
R1‑132803 | Way Forward on D2D Doppler Modeling | Qualcomm, Anite, RIM, Intel, III, General Dynamics Broadband | Noted |
R1‑132804 | Dropping Methodology for Groupcast and Broadcast Communication | Ericsson, ST-Ericsson, US Department of Commerce | Noted |
R1‑132805 | Text Proposal on specification impacts due to multi-subframe and cross-subframe scheduling | CATT, Huawei, HiSilicon | Noted |
R1‑132806 | Draft TS36.213CR Correction on SRS power scaling with multiple TAGs | CATT, Texas Instruments, Qualcomm Incorporation, Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑132807 | Suggested text for LS on MIMO OTA Channel Model | NEC, Sharp, Azimuth, Orange, NTT DoCoMo, Panasonic, Bluetest | Noted |
R1‑132808 | Response LS on performance during network failure | RAN4, CATT | Noted |
R1‑132809 | Reply LS on 3GPP internal LS on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | RAN2, Telecom Italia | Noted |
R1‑132810 | D2D Communication UE Dropping Way Forward | Qualcomm Inc., Huawei, HiSilicon, General Dynamics Broadband UK, III | Noted |
R1‑132811 | Draft LS on Proposal of Additional Channel Models for MIMO Performance Characterization | Motorala Mobility | Noted - Revised |
R1‑132812 | 36.872 v0.3.0 Update of small cell enhancements | Huawei, HiSilicon | Agreed |
R1‑132813 | Update to TR 36.843 | Qualcomm | Not treated |
R1‑132814 | Reply LS on Proposal of Additional Channel Models for MIMO Performance Characterization | RAN1, NEC, Sharp | Agreed |
R1‑132815 | LS on RRC parameters needed for Further MIMO Enhancement | RAN1, Alcatel Lucent | Agreed |
R1‑132816 | LS on coverage improvement for Low-Cost MTC UEs based on LTE | RAN1, Vodafone | Agreed |
R1‑132817 | 36.213 CR0428 (Rel-11, F) Correction on SRS power scaling with multiple TAGs | CATT, Texas Instruments, Qualcomm Incorporation, Nokia Siemens Networks, Nokia, ZTE | Agreed |
R1‑132818 | 36.213 CR0429 (Rel-11, F) Correction on MBSFN subframe configuration | LG Electronics, Huawei, HiSilicon, Panasonic, Renesas Mobile Europe Ltd | Agreed |
R1‑132819 | LS on Maximum TA difference between TAGs | RAN1, LG Electronics | Agreed |
R1‑132820 | LS on EPDCCH monitoring in PRS subframe | RAN1, Alcatel Lucent | Agreed |
R1‑132821 | void | - | Withdrawn |
R1‑132822 | Agreement on unicast, groupcast, broadcast dropping and association for D2D based on email discussion | Qualcomm Incorporated | Agreed |
R1‑132823 | Text Proposal on Scenarios of TR 25.701 | China Unicom | Agreed |
R1‑132824 | 36.213 CR0419r1 (Rel-10, F) CR on SCell activation timing | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | Agreed |
R1‑132825 | Reply to LS on UE SCell activation delay in CA | RAN1, Nokia Siemens Networks | Agreed |
R1‑132826 | Performance of Proposed Rank 1 and Rank 2 Codebook Design for 4Tx | AT&T | Revised |
R1‑132827 | Evaluations of Codebook 2a and 2b | Ericsson/ST-Ericsson | Not treated |
R1‑132828 | 36.213 CR0430 (Rel-11, A) CR on SCell activation timing | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | Agreed |
R1‑132829 | Evaluation of codebook 2a/2b for finalizing Rel.12 eMIMO | Texas Instruments | Not treated |
R1‑132830 | Text Proposal on Transmission of Uplink Scheduling Information in UMTS Heterogeneous Networks | Renesas Mobile Europe Ltd. | Agreed |
R1‑132831 | TP on Noise Padding in HetNets | Huawei, HiSilicon, Qualcomm | Agreed |
R1‑132832 | Evaluations of 4TX codebook option 2a and 2b | Huawei, HiSilicon | Not treated |
R1‑132833 | Details of 4TX codebook subsampling | Huawei, HiSilicon | Not treated |
R1‑132834 | Remaining details of codebook design and subsampling | Qualcomm Inc. | Not treated |
R1‑132835 | Remaining issues of enhanced 4TX Codebook | NEC Group | Not treated |
R1‑132836 | Further evaluation results for 4Tx codebook enhancement: rank 1-2 | Samsung | Not treated |
R1‑132837 | 25.800 v0.3.0 on UMTS Heterogeneous Networks | Huawei, HiSilicon | Agreed |
R1‑132838 | Remaining details of the enhanced 4Tx codebook | Intel Corporation | Not treated |
R1‑132839 | Evaluation results for 4Tx enhanced Codebook | LG Electronics | Not treated |
R1‑132840 | Proposals of enhanced 4Tx codebook and codebook subsampling, | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑132841 | System performance of double codebook for four DL antenna ports | Renesas Mobile Europe Ltd. | Not treated |
R1‑132842 | Analysis and performance evaluation of Rel-12 4Tx rank1-2 codebook | ZTE | Not treated |
R1‑132843 | Consideration on sub-sampling of Rel-12 4Tx rank1-2 codebook | ZTE | Not treated |
R1‑132844 | Consideration on sub-sampling of 4Tx rank3-4 codebook | ZTE | Not treated |
R1‑132845 | 25.800 v1.0.0 on UMTS Heterogeneous Networks | Huawei, HiSilicon | Endorsed |
R1‑132846 | Evaluation of 4Tx codebook options 2a and 2b | Nokia-Siemens Networks, Nokia | Not treated |
R1‑132847 | 4Tx codebook evaluation and codebook subsampling | Motorola Mobility | Not treated |
R1‑132848 | Codebooks for 4 Tx rank 1-2 and its subsampling | CATT | Not treated |
R1‑132849 | Merge of evaluation assumptions for small cell on/off and S-NCT | Ericsson, ST-Ericsson, Huawei, HiSilicon | Agreed |
R1‑132850 | LS on the support of radio-interface based synchronization mechanisms | RAN1, Qualcomm | Agreed |
R1‑132851 | Performance of Proposed Rank 1 and Rank 2 Codebook Design for 4Tx | AT&T | Withdrawn |
R1‑132852 | TP on Rate adaptation motivation and description of 2-loop and 3-loop approaches | Nokia Siemens Networks, Ericsson | Agreed |
R1‑132853 | TP on Range Expansion Results Using Macro Power Reduction | Qualcomm Inc. | Agreed |
R1‑132854 | Assumptions for Link Evaluation of DL Control Channels | Qualcomm Inc. | Agreed |
R1‑132855 | TP on Downlink System Performance of Hetnets in Co-channel Scenarios | Huawei, HiSilicon | Agreed |
R1‑132856 | TP on Uplink System Performance of Hetnets in Co-channel Scenarios | Huawei, HiSilicon | Agreed |
R1‑132857 | TP on SF-DC Evaluation in Hetnets | Huawei, HiSilicon | Agreed |
R1‑132858 | Simulation Assumptions for HS-DPCCH Overhead Reduction | Huawei, HiSilicon | Agreed |
page generated from database: 2024-04-22 07:58:53