3GPP TDocs (written contributions) at meeting
Meeting: SP-37 - 2007-09-17 to 2007-09-20, Riga
meeting id: SP-37 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
SP‑070502 | Draft report of TSG SA Meeting #36 | TSG SA Secretary | Approved |
SP‑070503 | Draft agenda for TSG SA meeting #37 | TSG SA Chairman | Approved |
SP‑070504 | 3GPP2 TSG-S CORRESPONDENCE: RE: Follow-up to 3GPP LS d "Mobility interworking between 3GPP and 3GPP2 systems" | 3GPP2 TSG-S | Noted |
SP‑070505 | Letter from ATIS to TSG SA Chairman: Re: ATIS IPTV Interoperability Forum | ATIS | Forward to SA WG4. Noted. |
SP‑070506 | Review of TSG SA Terms of Reference following an update of the 3GPP Scope | TSG SA Secretary | Noted |
SP‑070507 | Liaison Statement (from ETSI ERM) on GSM-R DMO | ETSI ERM | Noted |
SP‑070508 | LS from TISPAN WG1: Transfer of Parts of ETSI TS 181 005 (TISPAN Service and Capability Requirements) | TISPAN WG1 | Noted |
SP‑070509 | LS from TISPAN WG1: Transfer of Specifications Related to Common IMS | TISPAN WG1 | Noted |
SP‑070510 | LS (from CT WG1) on support for intra UTRAN service continuity based on Rel-7 VCC framework | CT WG1 | Noted |
SP‑070511 | LS (from CT WG3) on New WI and TR for Diameter-based protocols usage and recommendations in 3GPP | CT WG3 | Noted |
SP‑070512 | LS (from CT WG4) on reply to on Authentication Failure and Authentication Timeout | CT WG4 | Noted |
SP‑070513 | LS (from CT WG4) on Customized Alerting Tones in 3G CS domain | CT WG4 | Noted |
SP‑070514 | LS from SA WG1: Mobility interworking between 3GPP and WIMAX systems | SA WG1 | Noted |
SP‑070515 | LS from SA WG1: Mobility interworking between 3GPP and Broadband Wireless Access | SA WG1 | Noted |
SP‑070516 | Reply (from SA WG2) to LS on support for intra UTRAN service continuity based on Rel-7 VCC framework | SA WG2 | Noted |
SP‑070517 | Reply LS (from SA WG3) on Authentication Failure and Authentication Timeout | SA WG3 | Noted |
SP‑070518 | LS (from SA WG3) on Clarification regarding terminal certification and A5/2 removal | SA WG3 | Noted |
SP‑070519 | CRs to lists of specs | MCC Specifications Manager | Approved |
SP‑070520 | CR database structure | MCC Specifications Manager | Approved |
SP‑070521 | Specs lists per Release; a comparison | MCC Specifications Manager | Noted |
SP‑070522 | Specs status list prior to TSG meeting | MCC Specifications Manager | Noted |
SP‑070523 | Specs status list at the end of the present TSG SA meeting | MCC Specifications Manager | Noted |
SP‑070524 | 3GPP Support Team report | MCC Specifications Manager | Revised in SP-070705 |
SP‑070525 | Specs pertaining to frozen Releases not yet under change control | MCC Specifications Manager | - |
SP‑070526 | A5/3 Spec set use pre-Rel-6 | MCC Specifications Manager | Alternative 2 agreed. Noted |
SP‑070527 | CRs to drafting rules on tools versions | MCC Specifications Manager | Approved |
SP‑070528 | CR to 21.900: Upgrade working methods to Rel-8 | MCC Specifications Manager | Approved |
SP‑070529 | LS from 3GPP2, TSG-X: Re: Common IMS | 3GPP2 TSG-X | Proposed response LS in SP-070637. Noted. |
SP‑070530 | Report of SA WG2 Activities to TSG SA#37 | SA WG2 Chairman | Noted |
SP‑070531 | Draft report of SA WG2 meeting #59 for information | SA WG2 Secretary (MCC) | Noted |
SP‑070532 | 2 CRs to 23.141 (Rel-6, Rel-7) | SA WG2 | Approved |
SP‑070533 | 1 CR to 23.246 (Rel-7) | SA WG2 | Approved |
SP‑070534 | 2 CRs to 23.279 (Rel-7, Rel-8) | SA WG2 | Approved. 23.279 CR0037R2 Cat C |
SP‑070535 | 5 CRs to 23.228, 23.060 and 23.167 (Rel-7, Rel-8) | SA WG2 | Approved. 23.060 CR0598 Cat C |
SP‑070536 | 1 CR to 23.271 (Rel-7) | SA WG2 | Approved |
SP‑070537 | 1 CR to 23.206 (Rel-7) | SA WG2 | Approved |
SP‑070538 | 2 CRs to 23.002 (Rel-7, Rel-8) | SA WG2 | Approved |
SP‑070539 | 1 CR to 23.107 (Rel-7) | SA WG2 | Approved |
SP‑070540 | 1 CR to 23.228 (Rel-7) | SA WG2 | Approved. 23.228 CR0718R1 Cat C |
SP‑070541 | 12 CRs to 23.228 (Rel-7, Rel-8) | SA WG2 | Approved |
SP‑070542 | 1 CR to 23.234 (Rel-7) | SA WG2 | Returned to SA WG2. Postponed |
SP‑070543 | 2 CRs to 23.002 and 23.228 (Rel-8) | SA WG2 | Approved |
SP‑070544 | 2 CRs to 23.228 and 23.246 (Rel-8) | SA WG2 | Approved |
SP‑070545 | 1 CR to 23.228 (Rel-7) (remove Rel-7 requirements after study) | SA WG2 | Approved. 23.228 CR0672R3 Cat C |
SP‑070546 | Update SID on Multimedia Session Continuity | SA WG2 | Approved |
SP‑070547 | New Study Item for Extended Support of IMS Emergency Calls | SA WG2 | Approved |
SP‑070548 | New WID: Stage2 for Registration in Densely-populated area (RED) | SA WG2 | Revised in SP-070694 |
SP‑070549 | 10 CRs to 23.203 (Rel-7) | SA WG2 | Approved. 23.203 CR0051 Cat C |
SP‑070550 | New Study Item: "System enhancements for the use of IMS services in local breakout" | SA WG2 | Revised to clarify Study Item in SP-070686 |
SP‑070551 | Presentation of TS 23.401 for information | SA WG2 | Noted |
SP‑070552 | Presentation of TS 23.402 for information | SA WG2 | Noted |
SP‑070553 | Moving the NGN Industry Forward. 3GPP & MultiService Forum (MSF) Collaboration Opportunities | MultiService Forum (University of New Hampshire) | Noted |
SP‑070554 | Response LS (from TSG GERAN) to TC-RT DMO Group clarification regarding radio aspect of DMO | TSG GERAN | Noted |
SP‑070555 | Report of TSG GERAN activities to TSG SA#37 | TSG GERAN Chairman | Noted |
SP‑070556 | TSG GERAN agreed Rel-7 exception sheets to TSG SA | TSG GERAN | Approved |
SP‑070557 | Corrections to Updated SA WG1 WID in S1-071078 (Requirements for service continuity between mobile and WLAN networks) | Nokia Siemens Networks | Approved |
SP‑070558 | IETF status report | TSG CT Chairman | Noted |
SP‑070559 | TSG CT status report to TSG SA | TSG CT Chairman | Revised in SP-070683 |
SP‑070560 | SA WG1 presentation to TSG SA#36 | SA WG1 Chairman | Revised in SP-070667 |
SP‑070561 | New SA WG1 Term of reference proposal | SA WG1 | Approved |
SP‑070562 | CRs to 21.905 | SA WG1 | Approved |
SP‑070563 | CRs to 22.101 | SA WG1 | Split into SP-070661, SP-070662, SP-070663 |
SP‑070564 | CRs to 22.173 | SA WG1 | Split into SP-070659, SP-070660 |
SP‑070565 | CRs to 22.228 | SA WG1 | Split into SP-070657, SP-070658 |
SP‑070566 | CRs to 22.278 | SA WG1 | Approved |
SP‑070567 | CRs to 22.115 | SA WG1 | Approved |
SP‑070568 | WID for TISPAN MMTEL R7 for Common IMS and associated TS (ETSI 181 002 v128) | SA WG1 | Approved |
SP‑070569 | WID for Merging of TISPAN MMTEL R8 for Common IMS | SA WG1 | Approved |
SP‑070570 | WID for TISPAN Customized multimedia information services | SA WG1 | Approved |
SP‑070571 | WID for TISPAN Service and Capability requirements for Common IMS | SA WG1 | Revised in SP-070691 |
SP‑070572 | WID for Support of Value Added Services for Short Message Service | SA WG1 | Approved |
SP‑070573 | WID for Service requirements for open service access | SA WG1 | Revised in SP-070692 |
SP‑070574 | WID on IMS Centralised Service Control (ICS-RA) | SA WG1 | Revised in SP-070693 |
SP‑070575 | TR 22.948 v 2.0.0 on Study of Requirements of IP-Multimedia Subsystem (IMS) Convergent Multimedia Conferencing | SA WG1 | Approved (Rel-8) |
SP‑070576 | TS 22.153 v. 2.0.0 [PRIOR] Multimedia Priority Service Stage 1 | SA WG1 | Approved (Rel-8) |
SP‑070577 | TR 22.937 v.1.0.0: Requirements for seamless handover between mobile and WLAN networks; (Release 8) | SA WG1 | Noted |
SP‑070578 | LS (from SA WG4) on Update proposal to SA WG1 WID on Enhanced voice codecs for LTE/SAE | SA WG4 | Revised in SP-070677 |
SP‑070579 | 1 CR to 23.204 (Rel-7) | SA WG2 | Approved |
SP‑070580 | 2 CRs to 23.228 (Rel-7, Rel-8) | SA WG2 | Approved |
SP‑070581 | SA WG3 Status Report to TSG SA#37 | SA WG3 Chairman | Noted |
SP‑070582 | SA WG3#48 Draft Report v010 | SA WG3 Secretary | Noted |
SP‑070583 | Draft report of TSG CT#37 | TSG CT Secretary | Noted |
SP‑070584 | LS (from TSG CT) on co-ordination of SDO input to ITU-T Q.1741.5 | TSG CT | Endorsed. -> PCG |
SP‑070585 | LS (from TSG CT) on New WI and TR for Diameter-based protocols usage and recommendations in 3GPP | TSG CT | Noted |
SP‑070586 | PWS: How to progress PWS in Release 8 | NTT DoCoMo | Revised in off-line drafting in SP-070656 |
SP‑070587 | Proposed way forward for early completion of Release 8 SAE | T-Mobile International | Revised in SP-070684 |
SP‑070588 | On support of GPRS and EPS Emergency Calls in Rel-8 | Alcatel-Lucent | Revised in SP-070639 |
SP‑070589 | Mobility between 3GPP-WLAN Interworking and 3GPP Systems | Orange, China Mobile, Telenor, Nokia Siemens Networks, Nokia, Ericsson, Airvana, Marvell, Qualcomm | Revised in SP-070682 |
SP‑070590 | CR on IPSec mode for Zb | SA WG3 | Approved |
SP‑070591 | CR on 2G GBA | SA WG3 | Approved |
SP‑070592 | CR on A5 Misc | SA WG3 | Approved |
SP‑070593 | CRs on A5/2 | SA WG3 | Revised in SP-070671 |
SP‑070594 | CRs on correction of HLR-BSF reference point | SA WG3 | Approved |
SP‑070595 | CRs on IMS TS 33.203 issues | SA WG3 | Approved |
SP‑070596 | CR on LibSec | SA WG3 | Approved |
SP‑070597 | CRs on MBMS issues | SA WG3 | Approved |
SP‑070598 | CRs on TS 33.259 | SA WG3 | Approved |
SP‑070599 | CRs on MBMS LI | SA WG3 | Approved |
SP‑070600 | CRs on Key establishment between a UICC and a terminal | SA WG3 | Approved |
SP‑070601 | CRs on LI Rel-7 | SA WG3 | Approved |
SP‑070602 | CR on SIP Digest and TLS in IMS | SA WG3 | Approved |
SP‑070603 | WID Study of Remote management of USIM application on M2M Equipment | SA WG3 | Ericsson update proposal in SP-070635 |
SP‑070604 | Status report of SA WG5 | SA WG5 Chairman | Noted |
SP‑070605 | Rel-6/Rel-7 CRs on Charging (CH) | SA WG5 | Approved |
SP‑070606 | Rel-6/Rel-7 CRs on OAM&P (OAM) | SA WG5 | 32.635 CR0023, 32.643 CR0031, 32.643 CR0032, 32.645 CR0032 and 32.645 CR0033 were removed from this CR pack and sent back to SA WG4 (postponed). The remaining CRs were approved. |
SP‑070607 | Rel-6/Rel-7 CRs on Subscription Management (SuM) | SA WG5 | Approved |
SP‑070608 | Rel-7 CRs on Charging for Evolution of Policy Control and Charging (PCC-CH) | SA WG5 | Approved |
SP‑070609 | Rel-7 CRs on Charging for Identification of Communication Services in IMS (ServID-CH) | SA WG5 | Revised in SP-070674 |
SP‑070610 | Rel-8 CRs on OAM&P (OAM8) - UID 35051 Telecom Management Methodology | SA WG5 | Approved |
SP‑070611 | Rel-7 CRs on Charging Management Small Enhancements (CH7) | SA WG5 | Approved |
SP‑070612 | Rel-7 CRs on OAM&P Network Infrastructure Management (OAM7-NIM) | SA WG5 | 32.635 CR0024 was sent back to SA WG5 (postponed). 32.392 CR0004 was revised in SP-070675. The remaining CRs were approved |
SP‑070613 | Rel-7 CRs on OAM&P Performance Management (OAM7-PM) | SA WG5 | Approved |
SP‑070614 | Rel-8 CRs on OAM&P (OAM8) | SA WG5 | Approved |
SP‑070615 | TS 32.155 v2.0.0: Telecommunication management; Requirements template (Rel-8) | SA WG5 | Approved (Rel-8) |
SP‑070616 | TS 32.122 v1.0.0: Telecommunication management; Advanced alarming on Itf-N IRP Information Service (Rel-8) | SA WG5 | Noted |
SP‑070617 | WID on Subscriber and Equipment Trace for eUTRAN and EPC (OAM8) - OAM&P Rel 8 | SA WG5 | Approved |
SP‑070618 | WID on End point modelling for reference point (OAM8) - OAM&P Rel 8 | SA WG5 | Approved |
SP‑070619 | Rel-8 CRs on Charging Management small Enhancements (CH8) | SA WG5 | Approved |
SP‑070620 | TS 32.274 v1.0.0: Charging management; SMS charging (Rel-8) | SA WG5 | Noted |
SP‑070621 | WID to Add Interconnection Border Control Function (IBCF) to IMS Charging (CH8) - Charging Management small Enhancements | SA WG5 | Approved |
SP‑070622 | TR 32.820 v1.0.0: Charging management; 3GPP System Architecture Evolution (SAE): Charging aspects (Rel-8) | SA WG5 | Noted |
SP‑070623 | TR 32.818 v2.0.0: Telecommunication management; Study on 3GPP SA WG5 / MTOSI XML harmonization (Rel-8) | SA WG5 | Approved (Rel-8) |
SP‑070624 | TSG S4 Status Report at TSG-SA#37 | SA WG4 Chairman | Noted |
SP‑070625 | 3GPP TR 26.967 on "eCall Data Transfer -- in-band modem solution (Release 8)" v. 1.0.0 | SA WG4 | Noted |
SP‑070626 | CRs TS 26.173 and TS 26.204 on "Robust operation of AMRWB-decoder" (Release 5, Release 6 and Release 7) | SA WG4 | Approved |
SP‑070627 | CRs TS 26.234, TS 26.235 and TS 26.236 on "Various Corrections for TEI6 and Packet Switched Streaming rel6" (Release 6 and Release 7) | SA WG4 | Approved |
SP‑070628 | CRs TS 26.410 and 26.411 on "Packet Switched Streaming rel6 aacPlus codec" (Release 6 and Release 7) | SA WG4 | Approved |
SP‑070629 | CRs TS 26.346 on "MBMS-TSMBMS" (Release 6 and Release 7) | SA WG4 | Approved |
SP‑070630 | CRs TS 26.346 on "MBMS Enhancements & MBMS User Service Extensions" (Release 7) | SA WG4 | Approved |
SP‑070631 | CRs TS 26.114 on "Multimedia Telephony Capabilities for IMS (MTSI); Media Handling and Interaction" (Release 7) | SA WG4 | Approved |
SP‑070632 | CR TS 26.142 on "Technical corrections in the DIMS specification" (Release 7) | SA WG4 | Approved |
SP‑070633 | CR TR 26.935-0001 rev 2 on "PCVoIMS - Performance Characterization of VoIMS over HSDPA/EUL Channels" (Release 7) | SA WG4 | Approved |
SP‑070634 | CR TS 26.226 on "Requirement to send traditional text telephone signaling in case of native text conversion and CTM negotiation failure" (Release 8) | SA WG4 | Approved |
SP‑070635 | WID Study of Remote management of USIM application on M2M Equipment | Ericsson | Revised in SP-070702 |
SP‑070636 | LS (from TSG CT) on Overlap signalling at the I-MGCF | TSG CT | Noted |
SP‑070637 | LS (from TSG CT) on Common IMS | TSG CT | Noted |
SP‑070638 | CR to 21.900: Alignment of working methods with alignment CR practice agreed in TSG SA#36 (Rel-8) | Nokia | Revised in SP-070687 |
SP‑070639 | On support of GPRS and EPS Emergency Calls in Rel 8 | Alcatel-Lucent | Noted |
SP‑070640 | Revision of S1-071127, a CR to TS 22.011 | Nokia Siemens Networks, NTT DoCoMo | Returned to SA WG1 (Postponed) |
SP‑070641 | Request on TS Work for Public Warning System | ARIB, TTC | Noted. WID proposal in SP-070586 |
SP‑070642 | Wideband Codecs in SA WG1 & TISPAN | BT Group plc, Vodafone | LS to TISPAN in SP-070670 |
SP‑070643 | CR to 22.011: Additional service requirement to access control (Rel-8) | SA WG1 | Returned to SA WG1 (Postponed) |
SP‑070644 | CR to 42.069: TCRT: Clarification of interactions with supplementary and other GSM services (Rel-8) | SA WG1 | Approved |
SP‑070645 | CR to 42.068: TCRT: Clarification of interactions with supplementary and other GSM services (Rel-8) | SA WG1 | Approved |
SP‑070646 | CR to 22.234: Deletion of the PS-PS session continuity (Rel-7) | SA WG1 | Approved: Cat C |
SP‑070647 | TR22.812 v1.0.0 on Study into Network Selection Requirements for non-3GPP Access; | SA WG1 | Noted |
SP‑070648 | TR 22.942 v.2.0.0 on Study on Value Added Services for SMS | SA WG1 | Approved (Rel-8) |
SP‑070649 | WID on Requirements for service continuity between mobile and WLAN networks | SA WG1 | Update in SP-070557 |
SP‑070650 | Presentation on Recommendations for transfer from TISPAN to 3GPP | TISPAN WG1 Chairman, TSG SA Chairman, TISPAN Vice Chairman, SA WG1 co-convenor | Noted |
SP‑070651 | WID on End-User Identity (EUI) | SA WG1 | Approved |
SP‑070652 | WID on Study of enhanced voice service requirements for LTE/SAE | SA WG1 | Updated in SP-070578 |
SP‑070653 | WID on VGCS/VBS and GPRS Interactions | SA WG1 | Approved |
SP‑070654 | TSG RAN status report to TSG SA | TSG RAN Chairman | Noted |
SP‑070655 | Draft report of TSG RAN#37 | TSG RAN Secretary | Noted |
SP‑070656 | Proposed WID Earthquake and Tsunami Warning System Requirements (ETWS) | NTT DoCoMo | Revised in SP-070695 |
SP‑070657 | CRs to 22.228 | SA WG1 | Approved |
SP‑070658 | CR to 22.228 | SA WG1 | Approved |
SP‑070659 | CR to 22.173 | SA WG1 | Approved |
SP‑070660 | CR to 22.173 | SA WG1 | Approved |
SP‑070661 | CRs to 22.101 | SA WG1 | Approved |
SP‑070662 | CR to 22.101 | SA WG1 | Approved |
SP‑070663 | CR to 22.101: Requirements for eCall | SA WG1 | Revised in SP-070676 |
SP‑070664 | Response (from the Global Certification Forum) to a LS from 3GPP SA WG3 on Clarification regarding terminal certification and A5/2 removal | Global Certification Forum | Response to SP-070518. Noted |
SP‑070665 | PTCRB Response LS on clarification regarding terminal certification and A5/2 removal | PTCRB | Response to SP-070518. Noted |
SP‑070666 | LS to 3GPP2 on Common IMS transfer | TSG SA | Approved |
SP‑070667 | SA WG1 presentation to TSG SA#36 | SA WG1 Chairman | Noted |
SP‑070668 | LS to OMA of Updating the Progress of Convergent Multimedia Conferencing Work in 3GPP | China Mobile | Revised in SP-070700 |
SP‑070669 | LS on Transfer of work under "common IMS" | TSG SA (D. Knight) | Revised in SP-070696 |
SP‑070670 | LS on Codecs and Common IMS | TSG SA (S Hayes) | Revised in SP-070697 |
SP‑070671 | CRs on A5/2 | SA WG3 | Approved |
SP‑070672 | Proposed LS regarding suitability of existing 3GPP in-band modem technology for eCall | Nokia, Ericsson, RIM | Revised in SP-070688 |
SP‑070673 | SAE/LTE Completion | TSG RAN, TSG CT and SA WG2 Chairmen | Discussed in morning session. Noted |
SP‑070674 | Rel-7 CRs on Charging for Identification of Communication Services in IMS (ServID-CH) | SA WG5 | Approved |
SP‑070675 | R7 CR 32.392 Delta synchronization IRP Information Service (OAM7-NIM) | SA WG5 | Approved |
SP‑070676 | Updated CR to 22.101: Requirements for eCall | TSG SA | Approved |
SP‑070677 | WID on Study of enhanced voice service requirements for the Evolved Packet System (EPS) | TSG SA | Revised in SP-070698 |
SP‑070678 | MCC slide review of the Work Plan | MCC Work Plan co-ordinator | Revised in SP-070689 |
SP‑070679 | 3GPP Rel-7 Work Plan | MCC Work Plan co-ordinator | Noted |
SP‑070680 | 3GPP Rel-8 Work Plan | MCC Work Plan co-ordinator | Noted |
SP‑070681 | Summary of Rel-7 - Review of all Rel-7 Features (draft for TSG SA#37) | MCC Work Plan co-ordinator | Noted |
SP‑070682 | Mobility between 3GPP-WLAN Interworking and 3GPP Systems | Orange, China Mobile, Telenor, Nokia Siemens Networks, Nokia, Ericsson, Airvana, Marvell, Qualcomm, Brigewater | Revised in SP-070701 |
SP‑070683 | TSG CT status report to TSG SA | TSG CT Chairman | Noted |
SP‑070684 | Proposal for accelerating the specification of a core set of SAE | T-Mobile International | Discussed in morning session. Noted |
SP‑070685 | Conclusions from LTE/SAE release discussions | TSG SA | Revised in SP-070699 |
SP‑070686 | New Study Item: "System enhancements for the use of IMS services in local breakout" | SA WG2 | Approved |
SP‑070687 | CR to 21.900: Alignment of working methods with alignment CR practice agreed in TSG SA#36 (Rel-8) | Nokia | Revised in SP-070703 |
SP‑070688 | Proposed LS regarding suitability of existing 3GPP in-band modem technology for eCall | TSG SA | Revised in SP-070704 |
SP‑070689 | MCC slide review of the Work Plan | MCC Work Plan co-ordinator | Revised in SP-070706 |
SP‑070690 | Proposal for restructuring the 3GPP Work Plan for SAE | MCC Work Plan co-ordinator | Agreed |
SP‑070691 | WID for TISPAN Service and Capability for Common IMS | SA WG1 | Approved |
SP‑070692 | WID for Service requirements for open service access | SA WG1 | Approved |
SP‑070693 | WID on IMS Centralised Service Control (ICS-RA) | SA WG1 | Approved |
SP‑070694 | New WID: Stage2 for Registration in Densely-populated area (RED) | SA WG2 | Approved |
SP‑070695 | Proposed WID Earthquake and Tsunami Warning System Requirements (ETWS) | NTT DoCoMo | Approved |
SP‑070696 | LS on Transfer of work under "common IMS" | TSG SA | Approved |
SP‑070697 | LS on Codecs and Common IMS | TSG SA | Approved |
SP‑070698 | WID on Study of enhanced voice service requirements for the Evolved Packet System (EPS) | TSG SA | Approved |
SP‑070699 | Conclusions from LTE/SAE release discussions | TSG SA | Conclusions noted |
SP‑070700 | LS to OMA of Updating the Progress of Convergent Multimedia Conferencing Work in 3GPP | TSG SA | Approved |
SP‑070701 | Mobility between 3GPP-WLAN Interworking and 3GPP Systems | Orange, China Mobile, Telenor, Nokia Siemens Networks, Nokia, Ericsson, Airvana, Marvell, Qualcomm, Brigewater | Approved |
SP‑070702 | WID Study of Remote management of USIM application on M2M Equipment | Ericsson | Approved |
SP‑070703 | CR to 21.900: Alignment of working methods with alignment CR practice agreed in TSG SA#36 (Rel-8) | Nokia | Approved |
SP‑070704 | Proposed LS regarding suitability of existing 3GPP in-band modem technology for eCall | Nokia | Revised in SP-070708 |
SP‑070705 | 3GPP Support Team report | MCC Specifications Manager | Noted |
SP‑070706 | MCC slide review of the Work Plan | MCC Work Plan co-ordinator | Noted |
SP‑070707 | Proposed LS regarding suitability of existing 3GPP in-band modem technology for eCall | Airbiquity | Revised in SP-070709 |
SP‑070708 | LS regarding suitability of existing 3GPP in-band modem technology for eCall | Nokia | Updated in SP-070710 |
SP‑070709 | LS regarding suitability of existing 3GPP in-band modem technology for eCall | Airbiquity | Updated in SP-070710 |
SP‑070710 | LS regarding suitability of existing 3GPP in-band modem technology for eCall | TSG SA | Revised in SP-070711 |
SP‑070711 | LS regarding suitability of existing 3GPP in-band modem technology for eCall | TSG SA | Approved |
page generated from database: 2024-07-20 12:15:34