The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: GP-62 - 2014-05-26 to 2014-05-30, Valencia

meeting id: GP-62 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
GP‑140246 Draft Agenda for TSG GERAN #62 in Valencia, Spain GERAN Chairman -
GP‑140247 Draft Agenda for TSG GERAN WG1 during TSG GERAN #62 in Valencia, Spain GERAN WG1 Chairman -
GP‑140248 Draft Agenda for TSG GERAN WG2 during TSG GERAN #62 in Valencia, Spain GERAN WG2 Chairman -
GP‑140249 Draft Agenda for TSG GERAN WG3new #62 (electronic meeting) GERAN WG3 Chairman -
GP‑140250 G2-61 Meeting Report MCC -
GP‑140251 GERAN WG3 #62 Action Points TSG GERAN WG3 Chair -
GP‑140252 Work Items after the TSG WG Meeting GERAN3#62 ETSI Secretariat -
GP‑140253 CR 51.010-1-4939 Removal of technical content in 51.010-1 v11.4.0 and substitution with pointer to the next Release (Rel-11) ETSI Secretariat -
GP‑140254 CR 51.010-2-0839 Removal of technical content in 51.010-2 v11.4.0 and substitution with pointer to the next Release (Rel-11) ETSI Secretariat -
GP‑140255 CR 51.010-7-0021 Removal of technical content in 51.010-7 v11.0.0 and substitution with pointer to the next Release (Rel-11) ETSI Secretariat -
GP‑140256 CR 51.010-2-0840 Clarification to support status of A5/4 PICS (Rel-12) Samsung Electronics Co., Ltd -
GP‑140257 CR 51.010-5-0133 Update for the latest version of TTCN (Rel-10) TF 160 -
GP‑140258 CR 51.010-5-0134 Correcting the PICS implementation in TTCN as per specification 51.010-1(GP-140098) and 51.010-2(Rel-10) TF 160 -
GP‑140259 CR 51.010-5-0135 Correction to IR_G Test Suite in (Rel-10) TF 160 -
GP‑140260 CR 51.010-2-0841 PICS proforma tables and applicability conditions corrections (Rel-12) ROHDE & SCHWARZ -
GP‑140261 CR 51.010-1-4940 TC 44.2.3.1.4 Step 28A-2 conditional (Rel-12) ROHDE & SCHWARZ -
GP‑140262 CR 51.010-1-4941 26.6.1.7 Move of NIMTC test case to more appropriate clause 44 and adjust (Rel-12) ROHDE & SCHWARZ -
GP‑140263 CR 51.010-1-4942 44.2.1.1.11 NIMTC test case 26.6.1.7 moved to clause 44 (Rel-12) ROHDE & SCHWARZ -
GP‑140264 CR 51.010-2-0842 NIMTC test case 26.6.1.7 moved to 44.2.1.1.11 (Rel-12) ROHDE & SCHWARZ -
GP‑140265 CR 51.010-1-4943 TC 26.6.2.6 Corrections of test procedure in NIMTC test case (Rel-12) ROHDE & SCHWARZ -
GP‑140266 CR 51.010-7-0022 Clarification of Assistance Data usage with sub-tests (Rel-12) Spirent Communications -
GP‑140267 CR 51.010-7-0023 Correction to T_lamda_n_A values for scenario #1 and signalling tests (Rel-12) Spirent Communications -
GP‑140268 CR 51.010-1-4944 44.2.5.2.4 - Step correction, incorrect step 2, 16 and 19 (Rel-12) Anite Telecoms -
GP‑140269 CR 51.010-1-4945 TC 60.x correction to Inter-system hard handover test cases (Rel-12) Ericsson, ANRITSU LTD -
GP‑140270 CR 51.010-1-4946 TC 20.26 correction to Decoding of BCCH including information for UTRAN TDD cells (Rel-12) Ericsson, ANRITSU LTD -
GP‑140271 CR 51.010-2-0840 rev 1 Clarification to support status of A5/4 PICS (Rel-12) Samsung Electronics Co., Ltd -
GP‑140272 CR 51.010-1-4947 Update of SS test case 31.4.2.1.2.3 (Rel-12) CATR -
GP‑140273 CR 51.010-1-4948 Update of SS test case 31.4.4.2 (Rel-12) CATR -
GP‑140274 CR 51.010-1-4949 Update of SS test case 31.4.4.4 (Rel-12) CATR -
GP‑140275 CR 51.010-1-4950 Update of SS test case 31.3.2.2 (Rel-12) CATR -
GP‑140276 CR 51.010-1-4951 Update of SS test case 31.4.4.1.1.1 (Rel-12) CATR -
GP‑140277 CR 51.010-1-4952 Update of SS test case 31.4.4.1.2.3 (Rel-12) CATR -
GP‑140278 CR 51.010-1-4953 Update of SS test case 31.13.1.5 (Rel-12) CATR -
GP‑140279 CR 51.010-1-4954 Update of test case 26.2.2 (Rel-12) CATR -
GP‑140280 CR 51.010-1-4955 Update of test case 26.8.1.2.4.3, 26.8.1.2.4.4 and 26.8.1.2.4.5 (Rel-12) CATR -
GP‑140281 CR 51.010-1-4956 Update of test case 26.8.1.2.5.5 (Rel-12) CATR -
GP‑140282 CR 51.010-2-0843 Update of condition definition C286, C287, C226 and C236 (Rel-12) CATR -
GP‑140283 CR 51.010-1-4957 New test case 58b.1.1a Single Carrier Uplink TBF with no Downlink TBF/ DLMC TBF established / No change in Uplink TBF (Rel-12) Ericsson -
GP‑140284 CR 51.010-2-0844 New test case 58b.1.1a added Part2 and also DLMC introduced (Rel-12) Ericsson -
GP‑140285 Downlink Multi Carrier (DLMC) Work plan Ericsson -
GP‑140286 CR 36.523-1-2631 Correction to WI-87 LTE GERAN Test cases 6.2.3.23, 6.2.3.26, 6.2.3.27, 6.2.3.28, 6.2.3.29 and 6.2.3.30 (Rel-12) Anite Telecoms -
GP‑140287 GERAN3#62 Chair's meeting report TSG WG GERAN3 Chair -
GP‑140288 GERAN3#62 meeting report ETSI Secretariat -
GP‑140289 CR 48.008-0396 Use of the same GID for VGCS and VBS in the same Group Call Area (Rel-12) NSN POSTPONED
GP‑140290 uPoD use cases and scenarios Alcatel-Lucent -
GP‑140291 On Evaluation of Power Consumption of different MS tasks NSN -
GP‑140292 New SID on Access System for Ultra Low Complexity and Low Throughput Internet of Things based on Cellular (revision of GP-140301) VODAFONE Group Plc, Telecom Italia S.p.A., ORANGE, TELEFONICA S.A., HuaWei Technologies Co., Ltd, HiSilicon Technologies Co. Ltd, u-blox AG -
GP‑140293 On EARFCN extension in GERAN BlackBerry UK Limited, BROADCOM CORPORATION, China Mobile Com. Corporation, NSN, Qualcomm Incorporated -
GP‑140294 LS on the routing information for the Unnecessary HO to another RAT detection TSG RAN WG3 -
GP‑140295 Reply LS on provisioning of E-UTRA capabilities in GERAN TSG CT WG1 -
GP‑140296 New Study Item on GSM/EDGE optimization for Internet of Things Ericsson, NSN, MICROSOFT EUROPE SARL -
GP‑140297 GSM/EDGE optimization for Internet of Things Ericsson -
GP‑140298 Reply LS on extending E-UTRA band number and EARFCN numbering space TSG RAN WG4 -
GP‑140299 New SID on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (revision of GP-140404) VODAFONE Group Plc, Telecom Italia S.p.A., ORANGE, TELEFONICA S.A., HuaWei Technologies Co., Ltd, HiSilicon Technologies Co. Ltd, u-blox AG -
GP‑140300 Draft LS on SI for Low Throughput Internet of Things (To: SA, SA2, SA3) TSG GERAN -
GP‑140301 SID proposal for Access System for Cellular IoT VODAFONE Group Plc -
GP‑140302 Draft CR to 45.005 Introduction of BDS in GERAN ZTE Corporation -
GP‑140303 Discussion on the BDS performance requirement ZTE Corporation -
GP‑140304 CR 44.031-0223 Introduction of BDS in GERAN (Rel-12) ZTE Corporation POSTPONED
GP‑140305 CR 44.071-0033 Introduction of BDS in GERAN (Rel-12) ZTE Corporation POSTPONED
GP‑140306 CR 48.031-0010 Introduction of BDS in GERAN (Rel-12) ZTE Corporation POSTPONED
GP‑140307 CR 49.031-0065 Introduction of BDS in GERAN (Rel-12) ZTE Corporation POSTPONED
GP‑140308 TR 43.801 Solutions on VAMOS Enhancements v1.0.1 SI Rapporteur -
GP‑140309 Work Plan of SI “Solutions on VAMOS Enhancements” SI Rapporteur -
GP‑140310 Meeting Minutes of ENHVAMOS telco #6 SI Rapporteur -
GP‑140311 Updated System Performance Evaluation for Coordinated Channel Allocation (update of GP-140116) Huawei Technologies Co., Ltd. -
GP‑140312 pCR 43.801 Updated System Performance Evaluation for Coordinated Channel Allocation Huawei Technologies Co., Ltd. -
GP‑140313 Proposed Conclusion for the ENHVAMOS TR Huawei Technologies Co., Ltd. -
GP‑140314 Draft TR 45.876 UL MU-MIMO v0.0.3 SI Rapporteur -
GP‑140315 Simulation Assumptions for UL MU-MIMO SI Rapporteur -
GP‑140316 Work Plan of SI “UL MU-MIMO” SI Rapporteur -
GP‑140317 Meeting Minutes of UL MU-MIMO telco #1 SI Rapporteur -
GP‑140318 On Channel Model for UL MU-MIMO Huawei Technologies Co., Ltd. WITHDRAWN
GP‑140319 pCR 45.876 Channel Model for UL MU-MIMO Huawei Technologies Co., Ltd. -
GP‑140320 pCR 45.876 Pairing Scheme for UL MU-MIMO Huawei Technologies Co., Ltd. -
GP‑140321 Impact of SCPIR on Link Level Performance Huawei Technologies Co., Ltd. -
GP‑140322 Discussion on MTC Evolution for Cellular IoT Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd -
GP‑140323 Evaluations on Narrow-band M2M Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd -
GP‑140324 Proposed Working Assumptions on power consumption evaluation in idle mode for MTC devices Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd -
GP‑140325 Traffic model for Machine-Type Communications Huawei Technologies Co., Ltd., -
GP‑140326 Event -Triggered Neighbor Cells Measurement Huawei Technologies Co., Ltd., -
GP‑140327 Promotion of SIM specs with a view to closing early Releases MCC -
GP‑140328 On whether to update GERAN Terms of Reference for the Study on Cellular Internet of Things VODAFONE Group Plc -
GP‑140329 Meeting Minutes of MSRD for VAMOS Telco#5 WI Rapporteur -
GP‑140330 VAMOS III Performance Spreadsheet v20 WI Rapporteur -
GP‑140331 VAMOS III Performance Proposals NSN, MICROSOFT EUROPE SARL, MediaTek Inc., Intel Corporation, Telecom Italia S.p.A., Ericsson, Huawei Technologies Co. Ltd -
GP‑140332 VAMOS III Working Assumptions WI Rapporteur -
GP‑140333 CR 45.005-0569 VAMOS III Performance Requirements (Rel-12) NSN, MICROSOFT EUROPE SARL, MediaTek Inc., Intel Corporation, Telecom Italia S.p.A., Ericsson -
GP‑140334 MSRD for VAMOS Workplan WI Rapporteur -
GP‑140335 Downlink MIMO - Simulation Assumptions for Final Evaluation NSN -
GP‑140336 MIMO for Downlink Workplan SI Rapporteur -
GP‑140337 Meeting Minutes of BTS Energy Savings telco#14 SI Rapporteur -
GP‑140338 Draft 3GPP TR 45.926 V1.2.2 on Solutions for GSM/EDGE BTS Energy Saving SI Rapporteur -
GP‑140339 Work plan of SI “Solutions for GSM/EDGE BTS Energy Saving” SI Rapporteur -
GP‑140340 CR 51.021-0272 Miscellaneous Corrections related to ER-GSM 900 (Rel-12) NSN -
GP‑140341 CR 51.021-0273 Corrections to ER-GSM 900 (Rel-12) Ericsson WITHDRAWN
GP‑140342 DLMC – On the use of CS-3 for PDAN Ericsson, China Mobile Com. Corporation -
GP‑140343 DLMC – Correction of eTFI usage in PACCH Ericsson -
GP‑140344 CR 45.003-0134 DLMC – Correction of eTFI usage in PACCH (Rel-12) Ericsson -
GP‑140345 CR 45.005-0570 DLMC – Corrections (Rel-12) Ericsson -
GP‑140346 CR 43.064-0087 rev 2 DLMC – Introduction of CS-3 for PDAN (Rel-12) Ericsson -
GP‑140347 CR 45.003-0133 rev 2 DLMC – Introduction of CS-3 for PDAN (Rel-12) Ericsson -
GP‑140348 CR 45.005-0568 rev 2 DLMC – Introduction of CS-3 for PDAN (Rel-12) Ericsson -
GP‑140349 Draft CR 24.008 Introduction of DLMC Ericsson -
GP‑140350 DLMC – Working assumptions Ericsson -
GP‑140351 Training sequence design for NewToN Ericsson -
GP‑140352 NewToN – Working Assumptions Ericsson -
GP‑140353 Draft CR 24.008 Introduction of extended TSC sets Ericsson -
GP‑140354 CR 45.001-0078 Introduction of extended TSC sets (Rel-12) Ericsson POSTPONED
GP‑140355 CR 45.002-0177 Introduction of extended TSC sets (Rel-12) Ericsson POSTPONED
GP‑140356 CR 45.008-0621 Introduction of extended TSC sets (Rel-12) Ericsson POSTPONED
GP‑140357 CR 45.009-0024 Introduction of extended TSC sets (Rel-12) Ericsson POSTPONED
GP‑140358 NewToN – Collected performance Ericsson -
GP‑140359 NewToN - Workplan WI Rapporteur -
GP‑140360 Meeting minutes NewToN telco#3 WI Rapporteur -
GP‑140361 MS energy consumption model Ericsson -
GP‑140362 Power saving states in GERAN Ericsson -
GP‑140363 Short and long sync up procedure Ericsson -
GP‑140364 Use cases for the MTC power savings study Ericsson -
GP‑140365 Accelerated System Access Procedure Ericsson -
GP‑140366 LS from ERM to WGFM on frequencies in ECC DEC (02)05 ETSI TC ERM -
GP‑140367 Response LS on provisioning of E-UTRA capabilities in GERAN TSG RAN WG2 -
GP‑140368 LS on the fast return after CSFB TSG RAN WG3 -
GP‑140369 LS on defining the new RSRQ measurements definition TSG RAN WG4 -
GP‑140370 LS on Publication of GSMA HD Voice Logo Technical Annex F for Mobile Networks and Terminals for the usage of the 'HD voice' logo with LTE GSMA TSG & IREG -
GP‑140371 TR Skeleton for FS_uPoD SI Rapporteur -
GP‑140372 Work Plan for FS_uPoD SI Rapporteur -
GP‑140373 Meeting Minutes of uPoD Telco#1 SI Rapporteur -
GP‑140374 Definition of use cases and traffic models of uPoD SI China Mobile Com. Corporation -
GP‑140375 Scenarios and Traffic Models for uPoD China Mobile Com. Corporation -
GP‑140376 Evaluation of Implicit TBF release Huawei Technologies Co., Ltd. -
GP‑140377 Evaluation of FBCH Huawei Technologies Co., Ltd. -
GP‑140378 Meeting Minutes of GERANEMDA Telco#7 SI Rapporteur -
GP‑140379 GERANEMDA workplan SI Rapporteur -
GP‑140380 CR 44.060-1586 rev 10 Introduction of Downlink Multi Carrier (Rel-12) Ericsson -
GP‑140381 CR 44.004-0018 rev 2 Introduction of Downlink Multi Carrier (Rel-12) Ericsson -
GP‑140382 CR 44.018-1012 Introduction of extended TSC sets (Rel-12) Ericsson POSTPONED
GP‑140383 CR 44.060-1599 Introduction of extended TSC sets (Rel-12) Ericsson POSTPONED
GP‑140384 Uplink Stack Reduction - Way Forward Ericsson -
GP‑140385 Implicit TBF Release- System level simulations Ericsson -
GP‑140386 NewToN – Collected performance (revision of GP-140358) Ericsson -
GP‑140387 CR 43.064-0087 rev 3 DLMC – Introduction of CS-3 for PDAN (Rel-12) Ericsson -
GP‑140388 CR 45.003-0134 rev 1 DLMC – Correction of eTFI usage in PACCH (Rel-12) Ericsson -
GP‑140389 CR 45.005-0570 rev 1 DLMC – Corrections (Rel-12) Ericsson, NSN -
GP‑140390 CR 45.005-0569 rev 1 VAMOS III Performance Requirements (Rel-12) NSN, MICROSOFT EUROPE SARL, MediaTek Inc., Intel Corporation, Telecom Italia S.p.A, Ericsson -
GP‑140391 VAMOS III Working Assumptions (revision of GP-140332) WI Rapporteur -
GP‑140392 MSRD for VAMOS Workplan WI Rapporteur -
GP‑140393 Proposed Conclusion for the ENHVAMOS TR (update of GP-140313) Huawei Technologies Co., Ltd. -
GP‑140394 NewToN - Workplan WI Rapporteur -
GP‑140395 Simulation Assumptions for UL MU-MIMO (revision of GP-140315) SI Rapporteur -
GP‑140396 pCR 43.801 Updated System Performance Evaluation Results for Coordinated Channel Allocation (update of GP-140407) Huawei Technologies Co., Ltd. -
GP‑140397 Proposed Conclusion for the ENHVAMOS TR (update of GP-140408) Huawei Technologies Co., Ltd. -
GP‑140398 Draft 3GPP TR 45.926 V1.3.0 on Solutions for GSM/EDGE BTS Energy Saving SI Rapporteur -
GP‑140399 Work plan of SI “Solutions for GSM/EDGE BTS Energy Saving” SI Rapporteur -
GP‑140400 CR 45.005-0569 rev 2 VAMOS III Performance Requirements (Rel-12) NSN, MICROSOFT EUROPE SARL, TELECOM ITALIA S.p.A., MediaTek Inc., Intel, Ericsson -
GP‑140401 Implicit TBF release - System level simulations (update of GP-140385) Ericsson -
GP‑140402 DLMC -Working Assumptions Ericsson -
GP‑140403 LS on Introduction of Downlink Multi-Carrier (DLMC) (To: TSG CT WG1), Source: G2 TSG GERAN WG2 -
GP‑140404 New SID on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (revision of GP-140292) VODAFONE Group Plc, Telecom Italia S.p.A., ORANGE, TELEFONICA S.A., HuaWei Technologies Co., Ltd, HiSilicon Technologies Co. Ltd, u-blox AG -
GP‑140405 Draft 3GPP TR 43.802 GERAN Study on Mobile Data Applications (Release 12), v. 0.6.0 Editor (Huawei Technologies Co., Ltd.) -
GP‑140406 [DRAFT] 3GPP TR 43.869 GERAN Study on Power Saving for MTC Devices (Release 12), v. 0.0.2 Editor (China Mobile Com. Corporation) -
GP‑140407 pCR 43.801 Updated System Performance Evaluation Results for Coordinated Channel Allocation (update of GP-140312) Huawei Technologies Co., Ltd. -
GP‑140408 Proposed Conclusion for the ENHVAMOS TR (update of GP-140393) Huawei Technologies Co., Ltd. -
GP‑140409 LS on Use of the same GID for VGCS and VBS in the same Group Call Area (To: TSG CT WG1), Source: G2 TSG GERAN WG2 -
GP‑140410 3GPP TR 43.802 v1.0.0 GERANEMDA (Release 12) SI Rapporteur -
GP‑140411 New Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (revision of GP-140299) VODAFONE Group Plc. -
GP‑140412 G2-62 Chairman's Presentation G2 Chairperson -
GP‑140413 Draft Meeting Report TSG GERAN WG2 #62 TSG GERAN WG2 Secretary -
GP‑140414 [DRAFT] 3GPP TR 43.869 GERAN Study on Power Saving for MTC Devices (Release 12), v. 0.1.0 Editor (China Mobile Com. Corporation) -
GP‑140415 pCR 43.801 Updated System Performance Evaluation Results for Coordinated Channel Allocation (update of GP-140396) Huawei Technologies Co., Ltd. -
GP‑140416 Proposed Conclusion for the ENHVAMOS TR (update of GP-140397) Huawei Technologies Co., Ltd. -
GP‑140417 [DRAFT] 3GPP TR 43.869 GERAN Study on Power Saving for MTC Devices (Release 12), v. 0.1.1 Editor (China Mobile Com. Corporation) -
GP‑140418 New Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (revision of GP-140411) VODAFONE Group Plc. -
GP‑140419 TR 43.801 Solutions on VAMOS Enhancements v2.0.0 SI Rapporteur -
GP‑140420 Draft LS on SI for Low Throughput Internet of Things (To: SA, SA2, SA3) TSG GERAN -
GP‑140421 New Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (revision of GP-140418) VODAFONE Group Plc. -
GP‑140422 Outcome of TSG GERAN WG1 meeting # 62; Chairman's Presentation (slides) TSG GERAN WG1 Chairman -
GP‑140423 Report of TSG GERAN WG1 meeting during TSG GERAN #62, v. 0.0.1 TSG GERAN WG1 Secretary -
GP‑140424 3GPP TSG GERAN Work Plan Editor -
GP‑140425 Proposed Workplan for New Study on Cellular IoT VODAFONE Group Plc. -
GP‑140426 Outcome of TSG GERAN WG1 meeting # 62; Chairman's Presentation (slides) TSG GERAN WG1 Chairman -
GP‑140427 Proposed Workplan for New Study on Cellular IoT VODAFONE Group Plc. -
GP‑140428 Proposed Workplan for New Study on Cellular IoT VODAFONE Group Plc. -
GP‑140429 LS on SI for Low Throughput Internet of Things (To: SA2, SA3, Cc: TSG SA) TSG GERAN -

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links