3GPP TDocs (written contributions) at meeting
Meeting: S5-109 - 2016-08-29 to 2016-09-02, San Francisco
meeting id: S5-109 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S5‑165000 | Agenda | WG Chairman | imported from 3GU |
S5‑165001 | Report from last SA5 meeting | ETSI Secretariat | imported from 3GU |
S5‑165002 | SA5 status report at last SA meeting | WG Chairman | imported from 3GU |
S5‑165003 | SA5 results at last SA meeting | WG Chairman | imported from 3GU |
S5‑165004 | Time Plan for OAM&P | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165005 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165006 | Leaders meeting agenda | WG Chairman | imported from 3GU |
S5‑165007 | Leaders meeting minutes | WG Chairman | imported from 3GU |
S5‑165008 | CH Agenda and Time Plan | CH SWG Chair | imported from 3GU |
S5‑165009 | CH Executive Report from THIS Meeting | CH SWG Chair | imported from 3GU |
S5‑165010 | SA5 Meeting Calendar | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165011 | SA5 Working Procedures | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165012 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | imported from 3GU |
S5‑165013 | Process for management of draft TSs/TRs | WG Chairman | imported from 3GU |
S5‑165014 | CR Quality Check | ETSI Secretariat | imported from 3GU |
S5‑165015 | Deliverables due for the NEXT SA Plenary | ETSI Secretariat | imported from 3GU |
S5‑165016 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165017 | SA5 3GPP Work Plan | ETSI Secretariat | imported from 3GU |
S5‑165018 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | imported from 3GU |
S5‑165019 | Minutes of OAM&P Maintenance and Rel-14 small Enhancements | MCC | imported from 3GU |
S5‑165020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | Rapporteur (Huawei) | imported from 3GU |
S5‑165021 | Minutes for Study on Implementation for the Partitioning of Itf-N | Rapporteur(China Mobile) | imported from 3GU |
S5‑165022 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | Rapporteur(China Mobile) | imported from 3GU |
S5‑165023 | Minutes for Configuration Management for mobile networks that include virtualized network functions | Rapporteur(ZTE) | imported from 3GU |
S5‑165024 | Minutes for Fault Management for mobile networks that include virtualized network functions | Rapporteur(Huawei) | imported from 3GU |
S5‑165025 | Minutes for Performance management for mobile networks that include virtualized network functions | Rapporteur(Intel) | imported from 3GU |
S5‑165026 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | Rapporteur (Nokia Networks) | imported from 3GU |
S5‑165027 | Minutes for Filtering of PM measurements and data volume measurements for shared networks | Rapporteur(Ericsson) | imported from 3GU |
S5‑165028 | Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks | Rapporteur (Orange) | imported from 3GU |
S5‑165029 | Minutes for Study on OAM aspects of SON for AAS-based deployments | Rapporteur (Nokia Networks) | imported from 3GU |
S5‑165030 | Minutes for Study on Management and Orchestration of Network Slicing | Rapporteur (Huawei) | imported from 3GU |
S5‑165031 | Minutes for Study on management aspects of next generation network architecture and features | Rapporteur(Nokia) | imported from 3GU |
S5‑165032 | IPR and legal declaration | WG Chairman | imported from 3GU |
S5‑165033 | Status of email approvals | WG Vice Chair (Orange) | imported from 3GU |
S5‑165034 | Minutes of OAM support for Licensed Shared Access (LSA) | Rapporteur (Nokia) | imported from 3GU |
S5‑165035 | OAM&P SWG action list | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165036 | Work Plan status | WG Chair | imported from 3GU |
S5‑165037 | Minutes of OAM&P SWG opening session | WG Vice Chair (Huawei) | imported from 3GU |
S5‑165038 | SA5 work plan structure | SA vice chairman | imported from 3GU |
S5‑165039 | Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network | ATIS | imported from 3GU |
S5‑165040 | Reply LS from CT3 to SA5 on PDP type extension to non-IP PDN type | C3-162183 | imported from 3GU |
S5‑165041 | Resubmitted LS reply from CT4 to SA5 on progress of the work on Diameter Base Protocol Update | C4-163282 | imported from 3GU |
S5‑165042 | Reply LS from CT4 to SA5 on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose | C4-164288 | imported from 3GU |
S5‑165043 | Resubmitted Liaison reply from ETSI TC EE to 3GPP SA5 about standard ES 202 336-12 (ICT equipment power, energy and environmental parameters monitoring information model) | ETSI TC EE | imported from 3GU |
S5‑165044 | Resubmitted Liaison from ETSI TC EE to 3GPP SA5 in response to S5-162239 | ETSI TC EE | imported from 3GU |
S5‑165045 | Reply LS from SA2 to SA5 for enhancements required for charging of PDN connection to SCEF | S2-163767 | imported from 3GU |
S5‑165046 | Response LS from SA2 to SA5 “LS on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose” | S2-163768 | imported from 3GU |
S5‑165047 | Reply LS from SA2 to ETSI NTECH AFI cc SA5 on Autonomic Networking | S2-164274 | imported from 3GU |
S5‑165048 | LS from SA2 to SA5-CH on implication on charging from eFMSS | S2-164279 | imported from 3GU |
S5‑165049 | Editorial and minor technical changes to TS 28.525 based on EditHelp review | Nokia Networks | imported from 3GU |
S5‑165050 | Potential ad hoc meeting on NFV work items | SA5 vice chairman | imported from 3GU |
S5‑165051 | Network Slice Use Case Methodology | Cisco Systems Belgium | imported from 3GU |
S5‑165052 | Rel-13 CR 32.298 Correction on ASN.1 syntax for IMS, SMS and MONTE CDRs | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165053 | Rel-13 CR 32.251 Correction on Non-IP PDP type - alignement with TS 29.061 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165054 | Rel-13 CR 32.298 Correction on Non-IP PDP type -alignement with TS 29.061 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165055 | Rel-13 CR 32.298 Correction on CPDT CDRs ASN.1 description | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165056 | Rel-13 CR 32.251 Correction on RAT Type for charging SMS in MME | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165057 | pCR TS 28.520 include comments received from edithelp | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165058 | Draft TS 28523 skeleton | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165059 | pCR TS 28.523 add introduction and scope | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165060 | pCR TS 58.522 add stage 2 solutions | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165061 | pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165062 | pCR TS 28.520 change the terminologies related to legacy PM data | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165063 | pCR 32.856 Skeleton for new clause 5 | ORANGE, Huawei | imported from 3GU |
S5‑165064 | pCR 32.856 Proposed text for clause 5.1 | ORANGE, Huawei | imported from 3GU |
S5‑165065 | pCR 32.856 Proposed text for clause 5.2 | ORANGE, Huawei | imported from 3GU |
S5‑165066 | pCR 32.856 Proposed text for clause 5.3 | ORANGE, Huawei | imported from 3GU |
S5‑165067 | pCR 32.856 Update Scope | ORANGE, Huawei | imported from 3GU |
S5‑165068 | pCR 32.856 Align clause 4 with ES 203 228 v1.1.5 | ORANGE | imported from 3GU |
S5‑165069 | pCR 28.525 Fetch use case clarification | Cisco Systems Inc. | imported from 3GU |
S5‑165070 | pCR 28.525 Fetch On-boarded VNF Package Artifacts operation | Cisco Systems Inc. | imported from 3GU |
S5‑165071 | pCR 28.525 Abort VNF Package deletion operation | Cisco Systems Inc. | imported from 3GU |
S5‑165072 | pCR 28.525 Update NSD operation | Cisco Systems Inc. | imported from 3GU |
S5‑165073 | pCR 28.525 Delete NSD operation not in use | Cisco Systems Inc. | imported from 3GU |
S5‑165074 | pCR 28.525 Delete NSD operation when in use | Cisco Systems Inc. | imported from 3GU |
S5‑165075 | pCR 28.525 Query NSD operation | Cisco Systems Inc. | imported from 3GU |
S5‑165076 | pCR 28.525 On-board PNFD operation | Cisco Systems Inc. | imported from 3GU |
S5‑165077 | pCR 32.865 Cell merging correction | Cisco Systems Inc. | imported from 3GU |
S5‑165078 | pCR 32.865 Cell splitting correction | Cisco Systems Inc. | imported from 3GU |
S5‑165079 | Discussion Paper on 4G network slicing (IoT) management | Cisco Systems Inc. | imported from 3GU |
S5‑165080 | New WID for Study on Management and Orchestration of Network Slicing (IoT) in 4G | Cisco Systems Inc. | imported from 3GU |
S5‑165081 | Add missing Annex | Ericsson LM | imported from 3GU |
S5‑165082 | Rel-14 CR 32.103 Alignment with latest SA5 specification list and various enhancements | Huawei, Ericsson | imported from 3GU |
S5‑165083 | Discussion paper of the management for supporting RAN virtualization | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165084 | NEW SID Study on management aspects of the RAN virtualization | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165085 | Add virtualized resources related performance measurements | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165086 | pCR TS 28.526 add VNF termination procedure | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165087 | Discussion paper on direct consumption of VR PM by NM | Nokia Networks | imported from 3GU |
S5‑165088 | Discussion paper - Considerations for the VNF instantiation requested by EM | Nokia Networks | imported from 3GU |
S5‑165089 | pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N | Nokia Networks | imported from 3GU |
S5‑165090 | Discussion paper - options for initial configuration data in VNF instantiation | Nokia Networks | imported from 3GU |
S5‑165091 | pCR TS 28.525 Add UCs for initial configuration data in VNF instantiation | Nokia Networks | imported from 3GU |
S5‑165092 | pCR TS 28.526 Add procedure for initial configuration data in VNF instantiation | Nokia Networks | imported from 3GU |
S5‑165093 | Discussion paper - scenarios for NS update | Nokia Networks | imported from 3GU |
S5‑165094 | pCR TS 28.525 Add Use Cases for NS update with add VL and VNF | Nokia Networks | imported from 3GU |
S5‑165095 | pCR TS 28.525 Add Use Case for NS update with add SAP | Nokia Networks | imported from 3GU |
S5‑165096 | pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL | Nokia Networks | imported from 3GU |
S5‑165097 | pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL | Nokia Networks | imported from 3GU |
S5‑165098 | pCR 28.510 Add MOI deletion requirement | ZTE Corporation | imported from 3GU |
S5‑165099 | pCR 28.510 Add traceabilities of MOI configuration requirements | ZTE Corporation | imported from 3GU |
S5‑165100 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | ZTE Corporation | imported from 3GU |
S5‑165101 | draft TS 28.513 skeleton | ZTE Corporation | imported from 3GU |
S5‑165102 | pCR TS 28.513 Add introduction and scope | ZTE Corporation | imported from 3GU |
S5‑165103 | Presentation TS 28.510 to SA for information | ZTE Corporation | imported from 3GU |
S5‑165104 | New Section on Determination of Completeness of Charging Information in IMS | Deutsche Telekom AG | imported from 3GU |
S5‑165105 | Discussion paper- enhancement of NRM to support the VNF | ZTE Corporation | imported from 3GU |
S5‑165106 | Rel-13 CR 32.251 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165107 | Rel-13 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165108 | Rel-13 CR 32.298 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165109 | Proposed LS to CT1 on DCCII | Deutsche Telekom AG | imported from 3GU |
S5‑165110 | pCR TS 28.500 Consistency edits and clarifications | NTT DOCOMO | imported from 3GU |
S5‑165111 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship | NTT DOCOMO | imported from 3GU |
S5‑165112 | pCR TS 28.500 Aligning requirements and traceability on FM virtualization-specific use case | NTT DOCOMO | imported from 3GU |
S5‑165113 | pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases | NTT DOCOMO | imported from 3GU |
S5‑165114 | Rel-13 CR 32.253 Remove Editor's Note on parameters over T6a- Alignment with TS 23.282 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165115 | Skeleton for 28.302 "Licensed Shared Access (LSA) Controller (LC) Integration Reference Point (IRP); Information Service" | RED Technologies SAS | imported from 3GU |
S5‑165116 | pCR TS 28.500 UC and requirements on automating different types of configuration | NTT DOCOMO | imported from 3GU |
S5‑165117 | pCR TS 28.525 Adding specification UCs and requirements related to updating NS | NTT DOCOMO | imported from 3GU |
S5‑165118 | Definition of operations and parameters | RED Technologies SAS | imported from 3GU |
S5‑165119 | pCR TS 28.500 Updating the NE and VNF concept | China Mobile Com. Corporation | imported from 3GU |
S5‑165120 | pCR TS 28.500 Adding the PM collection use case | China Mobile Com. Corporation | imported from 3GU |
S5‑165121 | Discussion TS 28.500 the collection machenism of VNF PM data related to virtualized resource | China Mobile Com. Corporation | imported from 3GU |
S5‑165122 | Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions | China Mobile Com. Corporation | imported from 3GU |
S5‑165123 | New Study on a RESTful HTTP-based Solution Set | Nokia Networks | imported from 3GU |
S5‑165124 | Corrections according to EditHelp in 32.817 | Ericsson | imported from 3GU |
S5‑165125 | pCR 32817 Remove Editor’s note about true file name | Ericsson | imported from 3GU |
S5‑165126 | pCR Conclusion and Recommendations for TR 32.817 | Ericsson | imported from 3GU |
S5‑165127 | Presentation of Specification/Report to TSG: TR 32.817, Version 1.0.0 | Ericsson | imported from 3GU |
S5‑165128 | Reply to ETSI TC EE PS on ES 203 228 | ORANGE | imported from 3GU |
S5‑165129 | Reply to ETSI TC EE 02 on ES 202 336-12 | ORANGE | imported from 3GU |
S5‑165130 | pCR 32.856 Proposed text for clause 5.2 | ORANGE, Huawei | imported from 3GU |
S5‑165131 | pCR 32.856 Proposed text for clause 5.3 | ORANGE, Huawei | imported from 3GU |
S5‑165132 | pCR TR 28.800 Add management architecture use case of reusing the existing management system for next generation network | Huawei Technologies | imported from 3GU |
S5‑165133 | pCR TR 28.800 Add management use case for management and orchestration of the next generation network for build the new standalone management system | Huawei Technologies | imported from 3GU |
S5‑165134 | pCR TR 28.800 Add terminologies for network management and orchestration layering concept | Huawei Technologies | imported from 3GU |
S5‑165135 | pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration | Huawei Technologies | imported from 3GU |
S5‑165136 | pCR TR 28.801 Progress overview on network slicing in SA1, SA2, NGMN and analysis of potential management related aspects | Huawei Technologies | imported from 3GU |
S5‑165137 | pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs | Huawei Technologies | imported from 3GU |
S5‑165138 | pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs | Huawei Technologies | imported from 3GU |
S5‑165139 | pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs | Huawei Technologies | imported from 3GU |
S5‑165140 | pCR TR 28.801 Adding resource isolation terminologies for network slicing | Huawei Technologies | imported from 3GU |
S5‑165141 | pCR TR 28.801 adding slice management related teminology | Huawei Technologies | imported from 3GU |
S5‑165142 | Discussion of Network Slicing Descriptor | Huawei Technologies | imported from 3GU |
S5‑165143 | pCR TR 28.801 Adding definitions for network slicing lifecycle management | Huawei Technologies | imported from 3GU |
S5‑165144 | pCR TR 28.801 use case for network slice lifecycle management | Huawei Technologies | imported from 3GU |
S5‑165145 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services | Huawei Technologies | imported from 3GU |
S5‑165146 | pCR TR 28.802 add use case for supporting cric management case | Huawei Technologies | imported from 3GU |
S5‑165147 | Adding Chapter and content for Concepts and Background | Ericsson LM | imported from 3GU |
S5‑165148 | Adding Network Slice and related Definitions | Ericsson LM | imported from 3GU |
S5‑165149 | High level use case for creating two new network slice instances for different end user services | Ericsson LM | imported from 3GU |
S5‑165150 | pCR TS 28.500 Align the usage of term on non-application | Huawei Technologies | imported from 3GU |
S5‑165151 | pCR TS 28.510 Align the usage of term on non-application | Huawei Technologies | imported from 3GU |
S5‑165152 | pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier | Huawei Technologies | imported from 3GU |
S5‑165153 | pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation | Huawei Technologies | imported from 3GU |
S5‑165154 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation | Huawei Technologies | imported from 3GU |
S5‑165155 | pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em | Huawei Technologies | imported from 3GU |
S5‑165156 | pCR TS 28.515 Rapporteur proposal | Huawei Technologies | imported from 3GU |
S5‑165157 | Presentation sheet TS 28.515 for information to SA | Huawei Technologies | imported from 3GU |
S5‑165158 | Presentation sheet TS 28.516 for information to SA | Huawei Technologies | imported from 3GU |
S5‑165159 | pCR TS 28.517 Adding VNF alarm notification subscription stage 2 on Ve-vnfm-em | Huawei Technologies | imported from 3GU |
S5‑165160 | pCR TS 28.517 Adding alarm Information Model on Ve-Vnfm-em | Huawei Technologies | imported from 3GU |
S5‑165161 | pCR TS 28.518 Adding stage 3 content | Huawei Technologies | imported from 3GU |
S5‑165162 | Revised WID Study on Management and Orchestration of Network Slicing for next generation network | Ericsson LM | imported from 3GU |
S5‑165163 | Revised WID Study on Management and Orchestration of Network Slicing for next generation network | Ericsson LM | imported from 3GU |
S5‑165164 | Update of Scope | Ericsson LM | imported from 3GU |
S5‑165165 | Adding Chapter and content for Concepts and Background | Ericsson LM | imported from 3GU |
S5‑165166 | pCR TS 28.510 add the relationship between VNF termination and MO deletion | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165167 | Adding Network Slice and related Definitions | Ericsson LM | imported from 3GU |
S5‑165168 | pCR TS 28.511 add CM procedures for the VNF instantiation | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165169 | pCR TS 28.511 add CM procedures for the VNF termination | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165170 | High level use case for creating two new network slice instances for different end user services | Ericsson LM | imported from 3GU |
S5‑165171 | Addition of use cases | Nokia Networks | imported from 3GU |
S5‑165172 | pCR TR 32.880 overview of protocols based on socket API | China Mobile | imported from 3GU |
S5‑165173 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM | Ericsson Inc. | imported from 3GU |
S5‑165174 | Add UC Fetch VNF related VR PM data produced by VNFM | Ericsson Inc. | imported from 3GU |
S5‑165175 | Relation between NRM class and VNF/VNFC (implemented in VNFM) | Ericsson Inc. | imported from 3GU |
S5‑165176 | Problem of VL instance creation | Ericsson Inc. | imported from 3GU |
S5‑165177 | Add UC in 28.525 supporting Bulk MOIs creations | Ericsson Inc. | imported from 3GU |
S5‑165178 | R14 CR TS32.277 Message flow for Direct Communication via UE-to-Network Relay | Huawei | imported from 3GU |
S5‑165179 | R14 CR TS32.277 Message flow for Model B of ProSe Direct Discovery | Huawei | imported from 3GU |
S5‑165180 | R14 CR TS32.277 Message flow for ProSe One-to-One Direct Communication | Huawei | imported from 3GU |
S5‑165181 | R14 CR TS32.277 Message flow for Restricted Discovery | Huawei | imported from 3GU |
S5‑165182 | R14 CR TS32.277 Supplement for the ProSe Discovery and Communication | Huawei | imported from 3GU |
S5‑165183 | R14 CR TS32.251 Correction on the General Description | Huawei | imported from 3GU |
S5‑165184 | New WID Charging aspects of Improvements of Awareness of User Location Change | Huawei | imported from 3GU |
S5‑165185 | Possibility to terminate the charging session when no quota required | Ericsson LM | imported from 3GU |
S5‑165186 | Discussion of Control and User Plane Split | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S5‑165187 | New WID Study on mandatory AVP for 3GPP Diameter Accounting and Credit-Control Applications | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165188 | Draft CR 32.103 Alignment with latest SA5 specification list and various enhancements | Huawei, Ericsson | imported from 3GU |
S5‑165189 | Rel-13 CR 32.251 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell, Vodafone | imported from 3GU |
S5‑165190 | Rel-13 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165191 | Rel-13 CR 32.298 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
S5‑165192 | LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 | BBF | imported from 3GU |
S5‑165193 | LS from ETSI NFV to SA5 on NFV Interface and Architecture specifications | ETSI ISG NFV | imported from 3GU |
S5‑165194 | Discussion sequence proposal for 6.5.5 | Ericsson LM | imported from 3GU |
S5‑165195 | NGMN NWMO presentation | Huawei | - |
S5‑165196 | Reply to: Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network | Ericsson | - |
S5‑165197 | Discussion Sequence Proposal for 6.4.1.2 | ZTE | - |
S5‑165198 | Response LS from RAN2 cc SA5 on QoE reporting for streaming services | R2-165972 | - |
S5‑165199 | Reply to: LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 | Ericsson | - |
S5‑165200 | Informal presentation of draft LS NFV(16)000252 - LS OUT to 3GPP SA5 informing about update to application view in IFA015 | Nokia Networks | - |
S5‑165201 | New SID for Study on Management and Orchestration of Network Slicing (IoT) in 4G | Cisco Systems Inc. | - |
S5‑165202 | NEW SID Study on management aspects of the RAN virtualization | Intel Corporation (UK) Ltd | - |
S5‑165203 | New Study on a RESTful HTTP-based Solution Set | Nokia Networks | - |
S5‑165204 | pCR TR 28.800 Add management architecture use case of reusing the existing management system for next generation network | Huawei Technologies | - |
S5‑165205 | pCR TR 28.800 Add terminologies for network management and orchestration layering concept | Huawei Technologies | - |
S5‑165206 | pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration | Huawei Technologies | - |
S5‑165207 | pCR TS 28.525 Rapproteur proposal | Nokia Networks | - |
S5‑165208 | 28.525 presentation sheet to SA | Nokia Networks | - |
S5‑165209 | Update of Scope | Ericsson LM | - |
S5‑165210 | pCR TR 28.801 Progress overview on network slicing in SA1, SA2, NGMN and analysis of potential management related aspects | Huawei Technologies | - |
S5‑165211 | Enhancements to offline charging for IMS | AT&T | - |
S5‑165212 | Adding Chapter and content for Concepts and Background | Ericsson LM | - |
S5‑165213 | Adding Network Slice and related Definitions | Ericsson LM | - |
S5‑165214 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services | Huawei Technologies | - |
S5‑165215 | OAM&P SWG action list | WG Vice Chair (Huawei) | - |
S5‑165216 | pCR TR 28.801 use case for network slice lifecycle management | Huawei Technologies | - |
S5‑165217 | pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs | Huawei Technologies | - |
S5‑165218 | pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs | Huawei Technologies | - |
S5‑165219 | pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs | Huawei Technologies | - |
S5‑165220 | pCR TR 28.801 Adding resource isolation terminologies for network slicing | Huawei Technologies | - |
S5‑165221 | pCR TR 28.802 add use case for supporting cric management case | Huawei Technologies | - |
S5‑165222 | New WID Study on mandatory AVP for 3GPP Diameter Accounting and Credit-Control Applications | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165223 | Reply LS to LS reply from CT4 to SA5 on progress of the work on Diameter Base Protocol Update | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165224 | New WID Charging aspects of Improvements of Awareness of User Location Change | Huawei | - |
S5‑165225 | Possibility to terminate the charging session when no quota required | Ericsson LM | - |
S5‑165226 | New Section on Determination of Completeness of Charging Information in IMS | Deutsche Telekom AG | - |
S5‑165227 | LS to CT1 on Determination of Completeness of Charging Information in IMS | Deutsche Telekom AG | - |
S5‑165228 | R14 CR TS32.277 Message flow for Direct Communication via UE-to-Network Relay | Huawei | - |
S5‑165229 | R14 CR TS32.277 Message flow for Model B of ProSe Direct Discovery | Huawei | - |
S5‑165230 | R14 CR TS32.277 Message flow for ProSe One-to-One Direct Communication | Huawei | - |
S5‑165231 | R14 CR TS32.277 Message flow for Restricted Discovery | Huawei | - |
S5‑165232 | R14 CR TS32.277 Supplement for the ProSe Discovery and Communication | Huawei | - |
S5‑165233 | Rel-13 CR 32.251 Correction on Non-IP PDP type - alignement with TS 29.061 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165234 | Rel-13 CR 32.298 Correction on Non-IP PDP type -alignement with TS 29.061 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165235 | Rel-13 CR 32.251 Correction on RAT Type for charging SMS in MME | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165236 | Rel-13 CR 32.251 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165237 | Rel-13 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165238 | Rel-13 CR 32.298 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165239 | R14 CR TS32.251 Correction on the General Description | Huawei | - |
S5‑165240 | Rel-13 CR 32.251 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell, Vodafone | - |
S5‑165241 | Rel-13 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165242 | Process for management of draft TSs/TRs | WG Chairman | - |
S5‑165243 | SA5 Meeting Calendar | WG Vice Chair (Huawei) | - |
S5‑165244 | pCR TS 28.500 Consistency edits and clarifications | NTT DOCOMO | - |
S5‑165245 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship | NTT DOCOMO | - |
S5‑165246 | pCR TS 28.500 Updating the NE and VNF concept | China Mobile Com. Corporation | - |
S5‑165247 | pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases | NTT DOCOMO | - |
S5‑165248 | pCR TS 28.500 UC and requirements on automating different types of configuration | NTT DOCOMO | imported from 3GU |
S5‑165249 | Revised WID Filtering of PM measurements and data volume measurements for shared networks | Ericsson | - |
S5‑165250 | pCR TS 28.500 Adding the PM collection use case | China Mobile Com. Corporation | - |
S5‑165251 | pCR TS 28.500 Align the usage of term on non-application | Huawei Technologies | imported from 3GU |
S5‑165252 | pCR 28.510 Add MOI deletion requirement | ZTE Corporation | - |
S5‑165253 | pCR 28.510 Add traceabilities of MOI configuration requirements | ZTE Corporation | - |
S5‑165254 | draft TS 28.513 skeleton | ZTE Corporation | - |
S5‑165255 | Discussion paper- enhancement of NRM to support the VNF | ZTE Corporation | - |
S5‑165256 | Relation between NRM class and VNF/VNFC (implemented in VNFM) | Ericsson Inc. | - |
S5‑165257 | pCR TS 28.510 Align the usage of term on non-application | Huawei Technologies | imported from 3GU |
S5‑165258 | pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier | Huawei Technologies | imported from 3GU |
S5‑165259 | pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation | Huawei Technologies | - |
S5‑165260 | pCR TS 28.510 add the relationship between VNF termination and MO deletion | Intel Corporation (UK) Ltd | imported from 3GU |
S5‑165261 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | ZTE Corporation | imported from 3GU |
S5‑165262 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation | Huawei Technologies | - |
S5‑165263 | pCR TS 28.511 add CM procedures for the VNF instantiation | Intel Corporation (UK) Ltd | - |
S5‑165264 | pCR TS 28.511 add CM procedures for the VNF termination | Intel Corporation (UK) Ltd | - |
S5‑165265 | pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em | Huawei Technologies | - |
S5‑165266 | pCR TS 28.515 Rapporteur proposal | Huawei Technologies | - |
S5‑165267 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM | Ericsson Inc. | - |
S5‑165268 | pCR TS 28.517 Adding VNF alarm notification subscription stage 2 on Ve-vnfm-em | Huawei Technologies | - |
S5‑165269 | pCR TS 28.517 Adding alarm Information Model on Ve-Vnfm-em | Huawei Technologies | - |
S5‑165270 | pCR TS 28.518 Adding stage 3 content | Huawei Technologies | - |
S5‑165271 | pCR 28.500-110 update based on the reviews from edithelp | China Mobile | - |
S5‑165272 | pCR TS 28.523 add introduction and scope | Intel Corporation (UK) Ltd | - |
S5‑165273 | TDoc sequence proposal for 6.5.1 | Orange | - |
S5‑165274 | pCR TS 28.522 add stage 2 solutions | Intel Corporation (UK) Ltd | - |
S5‑165275 | Addressing EditHelp's comments | China Mobile | - |
S5‑165276 | pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification | Intel Corporation (UK) Ltd | - |
S5‑165277 | pCR TS 28.520 change the terminologies related to legacy PM data | Intel Corporation (UK) Ltd | - |
S5‑165278 | Presentation TS 28.510 to SA for information | ZTE Corporation | - |
S5‑165279 | Rel-13 CR 32.298 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165280 | Reply LS to Response LSs on Control Plane CIoT Optimisation Indicator propagated to PGW for charging purpose | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165281 | Draft CR General description for Gy Session Optimization | Ericsson | - |
S5‑165282 | Rel-14 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165283 | Meeting co-location with CT WGs in second quarter 2017 for SA5 SWG CH | Charging SWG Chair | - |
S5‑165284 | Rel-14 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | Nokia, Alcatel-Lucent Shanghai Bell | - |
S5‑165285 | draft TR 32.817 | Ericsson | - |
S5‑165286 | Draft TS 28.302 | Nokia | imported from 3GU |
S5‑165287 | Draft TR 32.856 | ORANGE | - |
S5‑165288 | Draft TR 32.880 | China Mobile | - |
S5‑165289 | pCR 28.525 Fetch On-boarded VNF Package Artifacts operation | Cisco Systems Inc. | - |
S5‑165290 | pCR 28.525 Abort VNF Package deletion operation | Cisco Systems Inc. | - |
S5‑165291 | pCR 28.525 Update NSD operation | Cisco Systems Inc. | - |
S5‑165292 | pCR 28.525 Delete NSD operation not in use | Cisco Systems Inc. | - |
S5‑165293 | pCR TS 28.526 add VNF termination procedure | Intel Corporation (UK) Ltd | - |
S5‑165294 | LS to IFA on the use of un-instantiated VNF instance ID in UpdateNS operation | Noikia Networks | - |
S5‑165295 | pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N | Nokia Networks | - |
S5‑165296 | Discussion paper - options for initial configuration data in VNF instantiation | Nokia Networks | imported from 3GU |
S5‑165297 | pCR TS 28.525 Add UCs for initial configuration data in VNF instantiation | Nokia Networks | - |
S5‑165298 | pCR TS 28.526 Add procedure for initial configuration data in VNF instantiation | Nokia Networks | - |
S5‑165299 | LSout to ETSI ISG NFV IFA WG on update NS scenarios | Nokia Networks | - |
S5‑165300 | pCR TS 28.525 Add Use Cases for NS update with add VL and VNF | Nokia Networks | - |
S5‑165301 | pCR TS 28.525 Add Use Case for NS update with add SAP | Nokia Networks | - |
S5‑165302 | pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL | Nokia Networks | - |
S5‑165303 | pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL | Nokia Networks | - |
S5‑165304 | pCR TS 28.525 Adding specification UCs and requirements related to updating NS | NTT DOCOMO | - |
S5‑165305 | 28.525 presentation sheet to SA | Nokia Networks | - |
S5‑165306 | Cover sheet TS 28.520 | Intel | - |
S5‑165307 | pCR Conclusion and Recommendations for TR 32.817 | Ericsson | - |
S5‑165308 | Presentation of Specification/Report to TSG: TR 32.817, Version 1.0.0 | Ericsson | - |
S5‑165309 | Revised WID Filtering of PM measurements and data volume measurements for shared networks | Ericsson | - |
S5‑165310 | Skeleton for 28.302 "Licensed Shared Access (LSA) Controller (LC) Integration Reference Point (IRP); Information Service" | RED Technologies SAS | - |
S5‑165311 | Definition of operations and parameters | RED Technologies SAS | - |
S5‑165312 | pCR TS 28.510 Rapporteur proposal | ZTE | - |
S5‑165313 | Addition of use cases | Nokia Networks | - |
S5‑165314 | pCR TR 32.880 overview of protocols based on socket API | China Mobile | - |
S5‑165315 | pCR 32.856 Update Scope | ORANGE, Huawei | - |
S5‑165316 | pCR 32.856 Proposed text for clause 5.2 | ORANGE, Huawei | - |
S5‑165317 | LSout to ETSI ISG NFV IFA WG on the use of un-instantiated VNF instance ID in UpdateNS operation | Noikia Networks | - |
S5‑165318 | OAM&P SWG action list | WG Vice Chair (Huawei) | - |
S5‑165319 | Reply to: Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network | Ericsson | - |
S5‑165320 | Reply to: LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 | Ericsson | - |
S5‑165321 | LS on update of the work plan of stage 3 | Huawei | - |
S5‑165322 | New SID for Study on Management and Orchestration of Network Slicing (IoT) in 4G | Cisco Systems Inc. | - |
S5‑165323 | New SID Study on management aspects of virtualized network functions that are part of the RAN | Intel Corporation (UK) Ltd | - |
S5‑165324 | New Study on a RESTful HTTP-based Solution Set | Nokia Networks | - |
S5‑165325 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship | NTT DOCOMO,China Mobile | - |
S5‑165326 | pCR TS 28.500 Updating the NE and VNF concept | China Mobile Com. Corporation | - |
S5‑165327 | new draft TS 28.500 | China Mobile | - |
S5‑165328 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services | Huawei Technologies | - |
S5‑165329 | Study on management aspects of next generation network architecture and features | Nokia | - |
S5‑165330 | Study on OAM aspects of SON for AAS-based deployments | Nokia | - |
S5‑165331 | pCR TS 28.500 Adding the PM collection use case | China Mobile Com. Corporation | - |
S5‑165332 | pCR 28.510 Add traceabilities of MOI configuration requirements | ZTE Corporation | - |
S5‑165333 | Draft TS 28.510 | ZTE | - |
S5‑165334 | Draft TS 28.513 | ZTE | - |
S5‑165335 | Discussion paper- enhancement of NRM to support the VNF | ZTE Corporation | - |
S5‑165336 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation | Huawei Technologies | - |
S5‑165337 | pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em | Huawei Technologies | - |
S5‑165338 | Draft TS 28.515 | Huawei | - |
S5‑165339 | Draft TS 28.517 | Huawei | - |
S5‑165340 | Draft TS 28.518 | Huawei | - |
S5‑165341 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM | Ericsson Inc. | - |
S5‑165342 | Draft TS 28.522 | Intel | - |
S5‑165343 | Draft TS 28.520 | Intel | - |
S5‑165344 | pCR TS 28.520 change the terminologies related to legacy PM data | Intel Corporation (UK) Ltd | - |
S5‑165345 | Draft TS 28.523 | Intel | - |
S5‑165346 | Draft TS 28.525 | Nokia | - |
S5‑165347 | Draft TS 28.526 | Nokia | - |
S5‑165348 | pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N | Nokia Networks | - |
S5‑165349 | pCR TS 28.525 Add Use Cases for NS update with add VL and VNF | Nokia Networks | - |
S5‑165350 | pCR TS 28.525 Add Use Case for NS update with add SAP | Nokia Networks | - |
S5‑165351 | pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL | Nokia Networks | - |
S5‑165352 | pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL | Nokia Networks | - |
S5‑165353 | LSout to ETSI ISG NFV IFA WG on the use of un-instantiated VNF instance ID in UpdateNS operation | Noikia Networks | - |
S5‑165354 | Draft TR 28.800 | Huawei | imported from 3GU |
S5‑165355 | pCR TR 28.800 Add terminologies for network management and orchestration layering concept | Huawei Technologies | - |
S5‑165356 | pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration | Huawei Technologies | imported from 3GU |
S5‑165357 | Draft TR 28.801 | Huawei | imported from 3GU |
S5‑165358 | pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs | Huawei Technologies | - |
S5‑165359 | pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs | Huawei Technologies | - |
S5‑165360 | pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs | Huawei Technologies | - |
S5‑165361 | pCR TR 28.801 Adding resource isolation terminologies for network slicing | Huawei Technologies | - |
S5‑165362 | pCR TR 28.801 use case for network slice lifecycle management | Huawei Technologies | - |
S5‑165363 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services | Huawei Technologies | - |
S5‑165364 | Update of Scope | Ericsson LM | - |
S5‑165365 | Adding Chapter and content for Concepts and Background | Ericsson LM | - |
S5‑165366 | pCR TR 28.802 add use case for supporting cric management case | Huawei Technologies | imported from 3GU |
S5‑165367 | Draft TS 28.511 | ZTE | imported from 3GU |
S5‑165368 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM | Ericsson Inc. | - |
S5‑165369 | Draft TS 28.301 | Nokia | imported from 3GU |
S5‑165370 | Draft TS 28.802 | Nokia | imported from 3GU |
S5‑165371 | LS to CT1 on Determination of Completeness of Charging Information in IMS | Deutsche Telekom AG | - |
S5‑165372 | LSout to ETSI ISG NFV IFA WG on update NS scenarios | Nokia Networks | - |
S5‑165373 | Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions | China Mobile Com. Corporation | - |
S5‑165374 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | - |
page generated from database: 2024-07-20 12:15:34