3GPP TDocs (written contributions) at meeting
Meeting: S4-50 - 2008-08-18 to 2008-08-22, Sophia Antipolis
meeting id: S4-50 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S4‑080451 | Proposed Meeting Agenda for SA4#50 | SA4 Chairman | - |
S4‑080452 | Proposed Meeting Schedule for SA4#50 | SA4 Chairman | - |
S4‑080453 | Draft TS 26.xxx eCall Data Transfer - in-band modem solution; General Description (Release 8) | Airbiquity Incorporated | - |
S4‑080454 | Draft TS 26.xxx+1 eCall Data Transfer - in-band modem solution; ANSI-C Reference Code (Release 8) | Airbiquity Incorporated | - |
S4‑080455 | Draft TS 26.xxx eCall Data Transfer - in-band modem solution; General Description (Release 8) | Qualcomm Incorporated | - |
S4‑080456 | Draft TS 26.xxx+1 eCall Data Transfer - in-band modem solution; ANSI-C Reference Code (Release 8) | Qualcomm Incorporated | - |
S4‑080457 | Draft TS 26.xxx eCall Data Transfer - in-band modem solution; General Description (Release 8) | Research in Motion UK Limited | - |
S4‑080458 | Draft TS 26.xxx+1 eCall Data Transfer - in-band modem solution; ANSI-C Reference Code (Release 8) | Research in Motion UK Limited | - |
S4‑080459 | Liaison Statement to ETSI on ISO/IEC 14496-20 (LASeR & SAF) | ISO/IEC/JTC1/SC29/WG11 (MPEG) | - |
S4‑080460 | Session initiation for PSS User Service | Huawei Technologies Co., Ltd | - |
S4‑080461 | Clarification on SSF | Huawei Technologies Co., Ltd | - |
S4‑080462 | Discussion on Service Provider Discovery and User Service Discovery | Huawei Technologies Co., Ltd | - |
S4‑080463 | Discussion on GBA-GAA and Key Management | Huawei Technologies Co., Ltd | - |
S4‑080464 | PSS content switching | Huawei Technologies Co., Ltd | - |
S4‑080465 | Softphone test setup for wideband terminals and related requirements | Orange SA, France Telecom | - |
S4‑080466 | RLR at maximum volume control for handheld handsfree mode | Orange SA, France Telecom | - |
S4‑080467 | Requirements and test methods for idle channel noise (receiving) and distortion (sending and receiving) | Orange SA, France Telecom | - |
S4‑080468 | Voice inter-working in MTSI-eMHI | Orange SA, France Telecom | WITHDRAWN |
S4‑080469 | Proposed Meeting Agenda for MTSI SWG during SA4#50 | MTSI SWG Chairman | - |
S4‑080470 | Introduction to a new SDP Attribute "a=imageattr" | Samsung Electronics Co., Ltd | - |
S4‑080471 | Implying Recommended Image Sizes for MTSI | Samsung Electronics Co., Ltd | - |
S4‑080472 | [DRAFT] LS Reply on SDP Enhancements to support resource allocation | CableLabs | - |
S4‑080473 | Quality of Experience (QoE) Reporting in MTSI | NOKIA Corporation | - |
S4‑080474 | Modification on IMS-based architecture for PSS | Orange SA | - |
S4‑080475 | Modification on service provider discovery | Orange SA | - |
S4‑080476 | Procedures at the UE and at the SDF for service discovery | Orange SA | - |
S4‑080477 | User Service Description retrieval and selection | Orange SA | - |
S4‑080478 | PSS & MBMS user profile | Orange SA, Huawei | - |
S4‑080479 | eCall Phase 2 Timeplan (Permanent Document PD1: Version 0.92 | Airbiquity | - |
S4‑080480 | Reply liaison statement on “IMS initiated and controlled PSS and MBMS User Service” Architecture | ETSI TISPAN WG2 | - |
S4‑080481 | Liaison statement on multiview video coding | ISO/IEC JTC1/SC29/WG11 and ITU-T SG16 Q.6 | - |
S4‑080482 | MPEG Surround - Status of Discussions | Dolby Laboratories Inc., Fraunhofer IIS, Philips | - |
S4‑080483 | Measurement Based Signalling for MTSI Video Dynamic Rate Adaptation | Qualcomm Europe, S.A.R.L. | - |
S4‑080484 | APTO-ARR Signalling for MTSI Video Dynamic Rate Adaptation | Qualcomm Europe, S.A.R.L. | - |
S4‑080485 | MTSI Video Dynamic Rate Adaptation: Evaluation Framework ver 0.5 | Qualcomm Europe, S.A.R.L. | - |
S4‑080486 | Reply LS on Creation of a SA-wide work item for work on ICS and IMS session continuity in Release 9 | TSG SA WG1 | - |
S4‑080487 | LS on Enhanced Voice Codecs for the Evolved Packet System (EPS) | TSG SA WG1 | - |
S4‑080488 | LS on Creation of a SA-wide work item for work on ICS and IMS session continuity in Release 9 | TSG SA WG2 | - |
S4‑080489 | eCall Host Lab Test report | AT4 wireless | - |
S4‑080490 | eCall Host Lab Presentation of results | AT4 wireless | - |
S4‑080491 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated... – IMS PSS session control | Telefon AB LM Ericsson | - |
S4‑080492 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated... – IMS MBMS session control | Telefon AB LM Ericsson | - |
S4‑080493 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated... – PSS MBMS Hybrid switching | Telefon AB LM Ericsson | - |
S4‑080494 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated... – Progressing the BM-SC split | Telefon AB LM Ericsson | - |
S4‑080495 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated... – Service Discovery | Telefon AB LM Ericsson | - |
S4‑080496 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated... – Policy and Charging control | Telefon AB LM Ericsson | - |
S4‑080497 | PSS Timeshift | Telefon AB LM Ericsson | - |
S4‑080498 | Recommendations for NAT traversal for PSS | Telefon AB LM Ericsson | - |
S4‑080499 | CR 26.346-0132 Transmitting a Full FDT snapshot (Release 8) | Telefon AB LM Ericsson | - |
S4‑080500 | CR 26.234-0123 “Fast Content Switching" corrections (Release 7) | Telefon AB LM Ericsson | - |
S4‑080501 | Recording and playback of protected MBMS streaming data | Telefon AB LM Ericsson | - |
S4‑080502 | eCall characterization | Telefon AB LM Ericsson | - |
S4‑080503 | CR 26.114-0032 rev1 Introduction of SDP Capability Negotiation (Release 7) | Telefon AB LM Ericsson | - |
S4‑080504 | Timed Graphics in 3GPP | Telefon AB LM Ericsson | - |
S4‑080505 | Fast channel switching in MBMS | Telefon AB LM Ericsson | - |
S4‑080506 | CR 26.346-0133 Addition of support for variable timestamps (Release 8) | Telefon AB LM Ericsson | - |
S4‑080507 | Interleaving and fast channel switching in MBMS | Telefon AB LM Ericsson | - |
S4‑080508 | Rate adaptation evaluation framework | Telefon AB LM Ericsson | - |
S4‑080509 | MTSI QoE Design Considerations | Telefon AB LM Ericsson | - |
S4‑080510 | CR 26.114-0037 MTSI QoE Configuration (Release 8) | Telefon AB LM Ericsson | WITHDRAWN |
S4‑080511 | CR 26.114-0038 MTSI QoE Reporting (Release 8) | Telefon AB LM Ericsson | WITHDRAWN |
S4‑080512 | CR 26.346-0128 rev 2 Enhancements of the QoE feature in MBMS (Release 8) (replaces S4-080392) | Telefon AB LM Ericsson | - |
S4‑080513 | CR 26.346-0126 rev 1 Correction to QoE reception reporting (Release 6) (replaces S4-080353) | Telefon AB LM Ericsson | - |
S4‑080514 | CR 26.346-0127 rev 1 Correction to QoE reception reporting (Release 7) (replaces S4-080354) | Telefon AB LM Ericsson | - |
S4‑080515 | Discussion on standardization of the eCall in-band modem solution | Qualcomm Europe, S.A.R.L. | - |
S4‑080516 | Ensuring SDP Validity with Content Switching | RealNetworks, Inc. | - |
S4‑080517 | Proposed Agenda for EVS SWG at SA4#50 | SA4 EVS SWG Chairman | - |
S4‑080518 | eCall Verification Phase Items | NOKIA Corporation | - |
S4‑080519 | CR 26.102-0019 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks | - |
S4‑080520 | CR 26.103-0038 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks | - |
S4‑080521 | CR 26.202-0003 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks | - |
S4‑080522 | CR 26.234-0124 Introduction of Time-Shifting (Release 8) | NOKIA Corporation | - |
S4‑080523 | Fast channel switching in MBMS using bundling | Telefon AB LM Ericsson | - |
S4‑080524 | Proposed meeting Agenda for eCall SWG during S4#50 | eCall SWG Chairman | - |
S4‑080525 | Pseudo CR to 3GPP TS 26.cde V0.3.0 (2008-07) IMS initiated … – Security Procedures | Telefon AB LM Ericsson | - |
S4‑080526 | Discussion on standardization of the eCall in-band modem solution | Airbiquity Incorporated | - |
S4‑080527 | Reply LS on “IMS initiated and controlled PSS and MBMS User Service” Architecture | TSG SA WG3 | POSTPONED |
S4‑080528 | Proposed Meeting Agenda from MBS SWG during SA4#50 | Chairman of MBS SWG | - |
S4‑080529 | LS Reply on SDP Enhancements to support resource allocation (To: CT1, CT3) | TSG SA WG4 | - |
S4‑080530 | Draft Reply LS on Creation of a SA-wide work item for work on ICS and IMS session continuity in Release 9 (To: SA1, Cc: SA2, SA3, SA5) | TSG SA WG4 | - |
S4‑080531 | Revised meeting Agenda for eCall SWG during S4#50(revision of 524) | eCall SWG Chairman | - |
S4‑080532 | eCall Phase 2 Selection Rules (PD4, V1.1) (revision of 444) | eCall SWG | - |
S4‑080533 | eCall Remaining Selection and Verification Phase Items (Permanent Document PD6: Version 0.1) | eCall SWG | - |
S4‑080534 | eCall Phase 2 Timeplan (Permanent Document PD1: Version 0.93) (revision of 479) | eCall SWG | - |
S4‑080535 | Draft eCall selection item requirements and procedures | Airbiquity | - |
S4‑080536 | Remaining eCall selection item test requirements and procedures (PD 6, Annex A) | eCall SWG | - |
S4‑080537 | Draft Report of the eCall SWG during S4#50 | eCall SWG Chairman | - |
S4‑080538 | CR 26.234-0125 rev 1 Using Entity-Tags to ensure SDP validity during Fast Content Switching (Release 8) | RealNetworks | - |
S4‑080539 | CR 26.234-0126 Informative Annex on PSS Nat traversal (Release 8) | Telefon AB LM Ericsson | - |
S4‑080540 | TS 26.cde V0.5.0 (2008-08) "IMS based PSS and MBMS User Service; Protocols (Release 8)" | Editor (Ericsson) | - |
S4‑080541 | TS 26.cde V0.4.0 (2008-08) "IMS initiated and controlled PSS and MBMS User Service; Protocols (Release 8)" | Editor (Ericsson) | - |
S4‑080542 | CR 26.346-0134 on Fast Start-up and channel switching (Release 8) | Telefon AB LM Ericsson | POSTPONED |
S4‑080543 | CR 26.346-0128 rev 3 Enhancements of the QoE feature in MBMS (Release 8) (replaces S4-080512) | Telefon AB LM Ericsson | - |
S4‑080544 | CR 26.234-0124 rev 1 Introduction of Time-Shifting (Release 8) | NOKIA Corporation, Telefon AB LM Ericsson, Real Networks | POSTPONED |
S4‑080545 | Draft CR on Informative Annex on PSS Nat traversal | Telefon AB LM Ericsson | - |
S4‑080546 | CR 26.346-0132 rev 1 Transmitting a Full FDT snapshot (Release 8) | Telefon AB LM Ericsson | - |
S4‑080547 | CR 26.234-0125 Using Entity-Tags to ensure SDP validity during Fast Content Switching (Release 8) | RealNetworks | - |
S4‑080548 | LS response to “LS on IMS initiated and controlled PSS and MBMS User Service; Architecture” (S4-080480) (To: ETSI TISPAN WG2, Cc: 3GPP SA2, 3GPP SA3, 3GPP CT1) | Telefon AB LM Ericsson | - |
S4‑080549 | LS response to “LS on IMS initiated and controlled PSS and MBMS User Service; Architecture” (S4-080480) (To: ETSI TISPAN WG2, Cc: 3GPP SA2, 3GPP SA3, 3GPP CT1) | Telefon AB LM Ericsson | - |
S4‑080550 | Draft Report on SA4 MBS SWG during SA4#50 | Interim Chairman MBS SWG | - |
S4‑080551 | On the equivalence of AMR-NB codec modes and other codecs | Telefon AB LM Ericsson | - |
S4‑080552 | Communication to ITU-T SG12 on the equivalence of AMR-NB codec modes and other codecs (To : ITU-T SG 12) | TSG SA WG4 | - |
S4‑080553 | Revised Softphone test setup for wideband terminals and related requirements | Orange SA, France Telecom | - |
S4‑080554 | Updated Requirements and New Performance Objectives for TS 26.131 | Rapporteur (Orange SA) | - |
S4‑080555 | Proposed Updates for TS 26.132 | Rapporteur (Orange SA) | - |
S4‑080556 | Draft Timeplan for WI MTSI Video: Dynamic Rate Adaptation/Signalling of Image Size v. 0.5 | MTSI SWG Chairman | - |
S4‑080557 | CR 26.346-0126 rev 2 Correction to QoE reception reporting (Release 6) (replaces S4-080513) | Telefon AB LM Ericsson | - |
S4‑080558 | CR 26.346-0127 rev 2 Correction to QoE reception reporting (Release 7) (replaces S4-080514) | Telefon AB LM Ericsson | - |
S4‑080559 | Draft 3GPP TR 22.813 Study of Use Cases and Requirements for Enhanced Voice Codecs for the Evolved Packet System (EPS) (Release 9) V0.6.0 | EVS SWG Chairman | - |
S4‑080560 | Draft LS answer to “Enhanced Voice Codecs for the Evolved Packet System (EPS)” (To: SA1) | TSG SA WG4 | - |
S4‑080561 | MTSI Video Dynamic Rate Adaptation: Evaluation Framework ver 0.6 | Qualcomm Europe, S.A.R.L. | - |
S4‑080562 | Draft Report SA4 EVS SWG | EVS SWG Chairman | - |
S4‑080563 | CR 26.102-0019 rev 1 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080564 | CR 26.103-0038 rev 1 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080565 | CR 26.202-0003 rev 1 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080566 | CR 26.102-0020 Nb-framing for GSM_FR and GSM_HR (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080567 | draft RFC for GSM_HR | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080568 | CR 26.114-0039 MTSI QoE configuration and reporting (Release 8) | NOKIA Corporation, Telefon AB LM Ericsson, T-Mobile International | POSTPONED |
S4‑080569 | Draft Report of MTSI SWG meeting during SA4#50 | MTSI SWG Secretary | - |
S4‑080570 | LS on considerations on transport block sizes for VoIP | TSG RAN WG2 | - |
S4‑080571 | Reply LS on Creation of a SA-wide work item for work on ICS and IMS session continuity in Release 9 (To: SA1, Cc: SA2, SA3, SA5) | TSG SA WG4 | - |
S4‑080572 | CR 26.102-0019 rev 2 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080573 | CR 26.103-0038 rev 2 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080574 | CR 26.202-0003 rev 2 Addition of CS over IP User Plane (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080575 | CR 26.102-0020 rev 1 Nb-framing for GSM_FR and GSM_HR (Release 8) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080576 | Draft LS answer to “LS on support of GSM codecs on CS over IP” (To: GERAN2, CT3 and CT4) | Telefon AB LM Ericsson | - |
S4‑080577 | CR 26.234-0123 rev 1 “Fast Content Switching" corrections (Release 7) | Telefon AB LM Ericsson | - |
S4‑080578 | CR 26.346-0131 rev 2 Correction to the file repair response (Release 6) | Telefon AB LM Ericsson, NOKIA Corporation | - |
S4‑080579 | CR 26.346-0130 rev 2 Correcting file repair response for file-group requests (Release 7) | Telefon AB LM Ericsson, NOKIA Corporation | - |
S4‑080580 | CR 26.132-0035 rev 1 Correction to allow wideband testing for GSM terminals (Release 7) | Telefon AB LM Ericsson | POSTPONED |
S4‑080581 | Report of the eCall SWG during S4#50 | eCall SWG Chairman | - |
S4‑080582 | Test set-up used for the eCall selection phase | RIM | - |
S4‑080583 | eCall Remaining Selection and Verification Phase Items (Permanent Document PD6: Version 0.2) | eCall SWG | - |
S4‑080584 | Remaining eCall selection item test requirements and procedures (PD 6, Annex A) | eCall SWG | - |
S4‑080585 | Draft TS 26.267 eCall Data Transfer - in-band modem solution; General Description (Release 8) | Qualcomm Incorporated | - |
S4‑080586 | Draft TS 26.268 eCall Data Transfer - in-band modem solution; ANSI-C Reference Code (Release 8) | Qualcomm Incorporated | - |
S4‑080587 | draft RFC for GSM_HR | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
S4‑080588 | LS answer to “LS on support of GSM codecs on CS over IP” (To: GERAN2, CT3 and CT4) | TSG SA WG4 | - |
S4‑080589 | Timeplan for Encoding formats, transport formats and media description signalling for interworking, QoE, and other enhancements to MTSI-MHI v. 0.3 | Telefon AB LM Ericsson | - |
S4‑080590 | TS 26.237 (2008-08) "IMS based PSS and MBMS User Service; Protocols (Release 8)" V1.0.0 | Editor (Ericsson) | - |
S4‑080591 | CR 26.346-0132 rev 2 Transmitting a Full FDT snapshot (Release 8) | Telefon AB LM Ericsson | - |
S4‑080592 | Draft 3GPP TR 22.813 Study of Use Cases and Requirements for Enhanced Voice Codecs for the Evolved Packet System (EPS) (Release 9) V0.6.1 | EVS SWG Chairman | - |
S4‑080593 | LS answer to “Enhanced Voice Codecs for the Evolved Packet System (EPS)” (To: SA1) | TSG SA WG4 | - |
S4‑080594 | On AMR-WB bit rate for TS 26.131/TS 26.132 distortion tests | Telefon AB LM Ericsson | POSTPONED |
S4‑080595 | eCall Remaining Selection and Verification Phase Items (Permanent Document PD6: Version 1.0) | eCall SWG | - |
S4‑080596 | eCall Phase 2 Timeplan (Permanent Document PD1: Version 1.0) (revision of 534) | eCall SWG | - |
S4‑080597 | eCall Phase 2 Timeplan (Permanent Document PD1: Version 1.1) (revision of 596) | eCall SWG | - |
S4‑080598 | Draft Report S4#50 plenary meeting v. 0.0.1 | TSG SA WG4 Secretary | - |
page generated from database: 2024-07-20 12:15:34