3GPP TDocs (written contributions) at meeting
Meeting: S1-87 - 2019-08-19 to 2019-08-23, Sophia Antipolis
meeting id: S1-87 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S1‑192000 | Draft Agenda for SA1#87 | Chair | imported from 3GU |
S1‑192001 | 2nd Draft Agenda for SA1#87 | Chair | imported from 3GU |
S1‑192002 | Final Schedule and Agenda with document allocation for SA1#87 | Chair | imported from 3GU |
S1‑192003 | Report of SA1 topics at SA#85 | Chair | imported from 3GU |
S1‑192004 | Draft minutes of SA1#86 | MCC | imported from 3GU |
S1‑192005 | Final minutes of SA1#86 | MCC | imported from 3GU |
S1‑192006 | Extract of the 3GPP Work Plan for SA1#87 | MCC | imported from 3GU |
S1‑192007 | Correction to Network Slicing Constraints | LG Electronics Inc. | imported from 3GU |
S1‑192008 | Service continuity requirements for video production | NICT | imported from 3GU |
S1‑192009 | Service Categorization in MUSIM | Samsung R&D Institute UK | imported from 3GU |
S1‑192010 | Improved Service Categories for MUSIM Paging | Samsung R&D Institute UK | imported from 3GU |
S1‑192011 | ‘Separate Devices’ assumption in MUSIM | Samsung R&D Institute UK | imported from 3GU |
S1‑192012 | Clarifying the ‘Separate Devices’ requirement in MUSIM | Samsung R&D Institute UK | imported from 3GU |
S1‑192013 | 23.831 P-CR: MINT Scope | Samsung, LG Electronics | imported from 3GU |
S1‑192014 | 23.831 P-CR: MINT HPLMN Failure is out of Scope | Samsung | imported from 3GU |
S1‑192015 | Introduction of Minimization of Service Interruption (MINT) | Samsung, LG Electronics | imported from 3GU |
S1‑192016 | CR to 22.829 Correction to potential Consolidated Requirements for UAV | LG Electronics | imported from 3GU |
S1‑192017 | CR to 22.829 Additional Consolidated Requirements for UAV | LG Electronics | imported from 3GU |
S1‑192018 | CR to 22.834 on MUSIM Emergency call | LG Electronics | imported from 3GU |
S1‑192019 | CR to 22.834 on MUSIM security | LG Electronics | imported from 3GU |
S1‑192020 | CR to 22.834 on MUSIM suspension | LG Electronics | imported from 3GU |
S1‑192021 | CR to 22.261 on correction for UAC and IoT | LG Electronics | imported from 3GU |
S1‑192022 | draft reply LS on on UAC for NB-IoT (R2-1908263) | LG Electronics | imported from 3GU |
S1‑192023 | FS_MINT: General update on TR22.831 V0.1.0 | LG Electronics | imported from 3GU |
S1‑192024 | FS_MINT: Update of Section 5.8 | LG Electronics, KT Corp, LG Uplus | imported from 3GU |
S1‑192025 | FS_MINT: Update of Section 5.2 and 5.9 | LG Electronics, LG Uplus, KT Corp | imported from 3GU |
S1‑192026 | FS_MINT: Text proposal for Overview | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192027 | FS_MINT: Text proposal for Conclusion | LG Electronics, Samsung, KT Corp, LG Uplus | imported from 3GU |
S1‑192028 | FS_MINT: Consolidation of Potential Requirements for TR22.831 | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192029 | new WID: Support for Minimization of service Interruption (MINT) | LG Electronics, Samsung, KT Corp, KRRI, SK Telecom, LG Uplus, ITL | imported from 3GU |
S1‑192030 | Clarification of dynamic policy control requirements | Nokia, Nokia Shanghai Bell, Vodafone | imported from 3GU |
S1‑192031 | FS_eCAV TSN Reliability enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192032 | FS_eCAV multi-connectivity for robotic automation | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192033 | Reply LS on APN storage in USIM | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192034 | Reply LS on network slice constraint requirement clarification | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192035 | Clarification of geographic constraint on a network slice | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192036 | CR to 22.125 New Requirements for EAV | LG Electronics France | imported from 3GU |
S1‑192037 | Additional broadcast regroup requirements | FirstNet | imported from 3GU |
S1‑192038 | Adding UxNB related requirements | ZTE Trunking Technology Corp. | imported from 3GU |
S1‑192039 | Clarify NS requirements | ZTE Trunking Technology Corp. | imported from 3GU |
S1‑192040 | Reply LS on network slice constraint requirement clarification | ZTE Trunking Technology Corp. | imported from 3GU |
S1‑192041 | Information on the new work item related to public warning services over mobile networks in APT member countries | SyncTechno Inc. | imported from 3GU |
S1‑192042 | CR for Rel-16 TS 22.119 Clarification and editorial updates | SyncTechno Inc. | imported from 3GU |
S1‑192043 | Reply LS on enhanced access control for IMS signalling | LG Electronics | imported from 3GU |
S1‑192044 | Access control for IMS service | LG Electronics | imported from 3GU |
S1‑192045 | CR0XXX to to 22.261 on access control for MINT | LG Electronics | imported from 3GU |
S1‑192046 | CR0XXX to to 22.011 on PLMN selection for MINT | LG Electronics | imported from 3GU |
S1‑192047 | FS_eCAV: Industrial communication network architecture | VODAFONE Group Plc, Ericsson | imported from 3GU |
S1‑192048 | Add one more case for control-to-control communication | VODAFONE Group Plc | imported from 3GU |
S1‑192049 | FS_eCAV: survival time vs. consecutive message loss | VODAFONE Group Plc | imported from 3GU |
S1‑192050 | FS_eCAV: communication service availability vs. failure | VODAFONE Group Plc | imported from 3GU |
S1‑192051 | EAV service level requirements: discussion paper | InterDigital, Inc. | imported from 3GU |
S1‑192052 | Study on requirements to enable AR/VR in 5G multimedia telephony service | China Mobile (Hangzhou) Inf. | imported from 3GU |
S1‑192053 | Addition of Abbreviations section in TR 22.826 | B-Com | imported from 3GU |
S1‑192054 | Addition of a synchronisation requirement in use case 5.3.3 (Communication QoS requirement for robotic telesurgery) | B-Com | imported from 3GU |
S1‑192055 | TR 22.826 final clean up | B-Com | imported from 3GU |
S1‑192056 | Addition of Conclusion and recommendations section in TR 22.826 | B-Com | imported from 3GU |
S1‑192057 | Addition of new definitions in TS 22.263 | B-Com | imported from 3GU |
S1‑192058 | Addition of new references in TS 22.263 | B-Com, Orange | imported from 3GU |
S1‑192059 | Addition of section 4.2 in TS 22.263 | B-Com, Orange | imported from 3GU |
S1‑192060 | Addition of new general performance requirements in TS 22.263 | B-Com | imported from 3GU |
S1‑192061 | Addition of new multicast performance requirements in TS 22.263 | B-Com | imported from 3GU |
S1‑192062 | Addition of security requirements for critical medical applications | B-Com, Vodafone | imported from 3GU |
S1‑192063 | Addition of medical telemetry requirements | B-Com, Philips | imported from 3GU |
S1‑192064 | Addition of robotic aided surgery and diagnosis performance requirements | B-Com | imported from 3GU |
S1‑192065 | Addition of a new synchronisation performance requirement | B-Com, Huawei | imported from 3GU |
S1‑192066 | ATRAC – TR Consolidated Requirements | NOVAMINT | imported from 3GU |
S1‑192067 | ATRAC – TR Consolidated KPIs | NOVAMINT | imported from 3GU |
S1‑192068 | KPIs for UAV command and control | InterDigital, Inc. | imported from 3GU |
S1‑192069 | Service level requirements for UAV | InterDigital, Inc. | imported from 3GU |
S1‑192070 | ATRAC – TR Clean Up | NOVAMINT | imported from 3GU |
S1‑192071 | ATRAC – TR Conclusion | NOVAMINT | imported from 3GU |
S1‑192072 | Network operation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192073 | Clarification for end-to-end latency | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192074 | evolution of IMS multimedia telephony service | China Mobile | imported from 3GU |
S1‑192075 | Reply LS on authentication of group of IoT devices | China Mobile Com. Corporation | imported from 3GU |
S1‑192076 | General descriptions of network controlled interactive service | China Telecom, OPPO, Samsung, Tencent | imported from 3GU |
S1‑192077 | Performance requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192078 | Group operation related requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192079 | Service hosting environment aspects of interactive service | OPPO, Samsung, Tencent | imported from 3GU |
S1‑192080 | Network resources utilization requirement in MUSIM | China Telecom | imported from 3GU |
S1‑192081 | Processing of editor note of TR 22.829 | China Unicom | imported from 3GU |
S1‑192082 | 22.125 CR of KPIs for UAV services | China Unicom | imported from 3GU |
S1‑192083 | Motivation for new SID evolution of IMS multimedia telephony service | China Mobile | imported from 3GU |
S1‑192084 | update the potential requirement for section 5.3 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192085 | update the potential requirement for section 5.10 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192086 | Enhanced Calling Name (eCNAM) Analytics Interworking | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192087 | Enhanced Calling Name (eCNAM) Analytics Interworking | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192088 | Update Use Case 5.1 for Enabling Access Control | Intel | imported from 3GU |
S1‑192089 | Definition and introduction of C2 Communication | Intel | imported from 3GU |
S1‑192090 | Clarification on the scope in TR 22.834 | Intel | imported from 3GU |
S1‑192091 | Clarification on consolidate service requirements in clause 8.1 | Intel | imported from 3GU |
S1‑192092 | Clarification on consolidate service requirements in clause 8.2 | Intel | imported from 3GU |
S1‑192093 | Clarification on emergency service requirements in section 8.3 | Intel | imported from 3GU |
S1‑192094 | Clarification on security aspects | Intel | imported from 3GU |
S1‑192095 | Service requirements for enabling Multi-USIM devices support | Intel | imported from 3GU |
S1‑192096 | Definition for devices supporting multiple USIMs | Intel | imported from 3GU |
S1‑192097 | Support for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192098 | Support of Emergency Services for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192099 | Removing solution specific requirements | vivo Mobile Communication Co., Charter Communications Inc, LG Electronics | imported from 3GU |
S1‑192100 | Editorial Clean up | vivo Mobile Communication Co.,Qualcomm Incorporated | imported from 3GU |
S1‑192101 | Discussion for new SID for Providing Textual information in a language appropriate for User | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192102 | Adapting text to language settings | vivo Mobile Communication Co., | imported from 3GU |
S1‑192103 | [DRAFT] Reply LS on IAIA liaison on the update of 3GPP Release 16 Stage 1 MARCOM standardization | SyncTechno Inc. | imported from 3GU |
S1‑192104 | CR to 22.261 on access control for MINT | LG Electronics | imported from 3GU |
S1‑192105 | FS_eCAV - Support to application layer for Cooperative carrying of work pieces | ZTE | imported from 3GU |
S1‑192106 | FS_eCAV - Support to application layer for Energy efficiency | ZTE | imported from 3GU |
S1‑192107 | FS_eCAV - Support to application layer for Integration with TSN networks | ZTE | imported from 3GU |
S1‑192108 | FS_eCAV - Support to application layer for Merging of working clock domains | ZTE | imported from 3GU |
S1‑192109 | Performance requirements of interactive service | Huawei, Huawei Device,China Telecom | imported from 3GU |
S1‑192110 | Use case to ensure same service for MUSIM than in single SIM | Huawei, Huawei Device, | imported from 3GU |
S1‑192111 | Corrections to support Mobile Terminated Services for MUSIM | Huawei, Huawei Device | imported from 3GU |
S1‑192112 | Corrections to MUSIM: Handle MT services | Huawei, Huawei Device,CMCC | imported from 3GU |
S1‑192113 | Corrections to MUSIM: Unnecessary suspension and resumption an active communication | Huawei, Huawei Device,CMCC | imported from 3GU |
S1‑192114 | Corrections to MUSIM | Huawei, Huawei Device | imported from 3GU |
S1‑192115 | Service category in MUSIM | Huawei, Huawei Device | imported from 3GU |
S1‑192116 | FS_eCAV - Support to application layer for Mobile Operation Panel | ZTE | imported from 3GU |
S1‑192117 | FS_eCAV - Support to application layer for Providing vertical positioning | ZTE | imported from 3GU |
S1‑192118 | Update consolidation of 6.2 section | Huawei,Huawei Device, China Telecom | imported from 3GU |
S1‑192119 | FS_eCAV - use_case_Industrial application analytics | ZTE | imported from 3GU |
S1‑192120 | Use case update of section 5.2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
S1‑192121 | Editorial corrections of TS 22.261 | China Telecom | imported from 3GU |
S1‑192122 | New WID on Enhancement for the 5G Control Plane Steering of Roaming for UE in CONNECTED mode | NTT DOCOMO INC. | imported from 3GU |
S1‑192123 | Enhancement for the 5G Control Plane Steering of Roaming for UE in CONNECTED mode | NTT DOCOMO INC. | imported from 3GU |
S1‑192124 | 22834 CR - Service categories | China Mobile | imported from 3GU |
S1‑192125 | User preferences among MUSIMs | Beijing Xiaomi Mobile Software | imported from 3GU |
S1‑192126 | General description for UAV aspects | China Unicom | imported from 3GU |
S1‑192127 | Discussion on Bulk IoT text in TS 22.261 | Qualcomm communications-France | imported from 3GU |
S1‑192128 | Update existing use case to avoid interruption of emergency call | China Mobile Com. Corporation | imported from 3GU |
S1‑192129 | Clarify requirements for bulk IoT operation and authentication | Qualcomm communications-France | imported from 3GU |
S1‑192130 | CR to 22.125 Network exposure requirements for UAV | China Unicom | imported from 3GU |
S1‑192131 | Alignment of use case description text and Survival Time requirements | B-Com | imported from 3GU |
S1‑192132 | New WID on broadcast / multicast requirements supporting Mission Critical Services in 5G | BDBOS | imported from 3GU |
S1‑192133 | Broadcast / multicast requirements supporting Mission Critical Services in 5G | BDBOS | imported from 3GU |
S1‑192134 | Power optimization requirement in MUSIM | China Telecommunications | imported from 3GU |
S1‑192135 | CR for CSA clarification | Huawei | imported from 3GU |
S1‑192136 | FS_eCAV – Consolidate service requirements on Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192137 | CR to 22.829 supplement service experience assurance requirements for UAV | China Unicom | imported from 3GU |
S1‑192138 | CR on 22.261 for UAC for IMS signalling | Huawei, KDDI, DOCOMO | imported from 3GU |
S1‑192139 | FS_REFEC_Proposed requirement text for network slicing. | Philips International B.V. | imported from 3GU |
S1‑192140 | eCAV – Further 5G service requirements for Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192141 | CR to 22.125 service experience assurance requirements for UAV | China Unicom | imported from 3GU |
S1‑192142 | Reply LS on eAC for IMS signalling | Huawei, KDDI, NTT DOCOMO | imported from 3GU |
S1‑192143 | Discussion paper on eAC for IMS signalling | Huawei, KDDI, NTT DOCOMO | imported from 3GU |
S1‑192144 | Power optimization requirement in MUSIM | China Telecommunications | imported from 3GU |
S1‑192145 | FS_REFEC – TR Overview section | KPN | imported from 3GU |
S1‑192146 | FS_REFEC – TR Consolidated Requirements | KPN | imported from 3GU |
S1‑192147 | FS_REFEC – TR Conclusion and recommendations | KPN | imported from 3GU |
S1‑192148 | Connectivity models description section updated. | KPN | imported from 3GU |
S1‑192149 | FS_REFEC_Clean up requirement text about application layer groups | Philips International B.V. | imported from 3GU |
S1‑192150 | Connectivity models new functional requirements | KPN | imported from 3GU |
S1‑192151 | Clarification and pCR to TR 22.827 on AVProd | Tencent | imported from 3GU |
S1‑192152 | New Use Case and Requirements for Video Production with Remote Production Centre | Tencent | imported from 3GU |
S1‑192153 | Clarification and pCR for Communication monitoring for CAV applications | Tencent | imported from 3GU |
S1‑192154 | Clarification Multiple Working Clock Domains in gNB and pCR to TR 22.832 | Tencent | imported from 3GU |
S1‑192155 | Clarification and pCR for Cooperative carrying of work pieces | Tencent | imported from 3GU |
S1‑192156 | CR to 22834 - Service categories | China Mobile | imported from 3GU |
S1‑192157 | Non-public networks as private slices | CATT | imported from 3GU |
S1‑192158 | Motivation for new SID - evolution of IMS multimedia telephony service | China Mobile | imported from 3GU |
S1‑192159 | new SID - evolution of IMS multimedia telephony service | China Mobile | imported from 3GU |
S1‑192160 | new SID - evolution of IMS multimedia telephony service | China Mobile | imported from 3GU |
S1‑192161 | Merged potential service requirements: Non-public networks as private slices | CATT | imported from 3GU |
S1‑192162 | Delete the editor’s note in 5.11 | CATT | imported from 3GU |
S1‑192163 | Service restriction requirements for UAV | CATT, China Unicom, Huawei, ZTE | imported from 3GU |
S1‑192164 | new SID - evolution of IMS multimedia telephony service | China Mobile | imported from 3GU |
S1‑192165 | consolidation for clock synchronization in TR 22.826 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192166 | Update of traffic scenario: InHome | KPN | imported from 3GU |
S1‑192167 | Update of traffic scenario: SmartFactory | KPN | imported from 3GU |
S1‑192168 | Update of traffic scenario: Metering use case | KPN | imported from 3GU |
S1‑192169 | Update of traffic scenario: Containers | KPN | imported from 3GU |
S1‑192170 | Update of traffic scenario: Freight wagons | KPN | imported from 3GU |
S1‑192171 | New traffic scenario: Public Safety | KPN | imported from 3GU |
S1‑192172 | Enhance MCData generic capability with data pull service | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192173 | Activate Location Information report of a specific FA in a certain area | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192174 | Support the FRMCS use case for Arbitration when a user is registered to multiple UEs | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192175 | Support the FRMCS use case for Arbitration | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192176 | Enhance interworking between MCX and GSM-R with presence | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192177 | Correcting inconsistency of call termination condition for MCX Service types | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192178 | Correcting inconsistency of call termination condition for MCX Service types | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192179 | Clarify routing location dependent communications as part of handling MCX Service Private Communication requests | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192180 | New traffic scenario: Wearables | KPN | imported from 3GU |
S1‑192181 | Use case of data traffic convergence in MUSIM | China Telecom | imported from 3GU |
S1‑192182 | Extend Functional Alias binding to MCX Service Private Communication | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192183 | Traffic Scenario - consolidation | KPN | imported from 3GU |
S1‑192184 | MCData QoS required for rail communication | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192185 | Video category as a rail communication scenario (limited to main lines) | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192186 | KPIs for UE to network relaying in 5G system | KPN | imported from 3GU |
S1‑192187 | FS_REFEC Coverage enhancements for delay tolerant data | Convida Wireless | imported from 3GU |
S1‑192188 | FS_eCAV - Wired to wireless link replacement for Industry 4.0 | Siemens AG | imported from 3GU |
S1‑192189 | eCAV – further 5G service requirements for wired to wireless link replacement for smart manufacturing / Industry 4.0 | Siemens AG | imported from 3GU |
S1‑192190 | Study on sharing administrative configuration between interconnected MCX systems | BDBOS | imported from 3GU |
S1‑192191 | Motivation Study on sharing administrative configuration between interconnected MCX systems | BDBOS | imported from 3GU |
S1‑192192 | Update gap analysis for requirements in subclause 6 Critical communication applications related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192193 | FS_eCAV – Update use case “Integration of 5G networks with TSN networks (time synchronization)” | Siemens AG | imported from 3GU |
S1‑192194 | Update gap analysis for requirements in subclause 7 Performance communication applications related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192195 | Update gap analysis for requirements in subclause 9 Critical support applications related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192196 | Update gap analysis for requirements in subclause 12 FRMCS System principles related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192197 | Clarify CS/PS interworking versus interconnection between GSM-R and FRMCS users | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192198 | Location information of an FRMCS Equipment | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192199 | FS_eCAV – Use Case Flexible Manufacturing | Siemens AG | imported from 3GU |
S1‑192200 | 3GPP building blocks to support Real-time video communication (video conferencing) related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192201 | Degradation of a communication link for AVC | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192202 | eCAV – further 5G service requirements for flexible manufacturing (TSN) | Siemens AG | imported from 3GU |
S1‑192203 | TR22.827_EditorialChanges | EBU | imported from 3GU |
S1‑192204 | TR22.827_ConsolidatedRequirements | EBU | imported from 3GU |
S1‑192205 | TR22.827_ConsolidatedDualConnectivity | EBU | imported from 3GU |
S1‑192206 | TS22.263_Skeleton | EBU | imported from 3GU |
S1‑192207 | TS22.263_MainBody | EBU | imported from 3GU |
S1‑192208 | Clarification of treatment of private call and private emergency calls to functional aliases activated by more than one MCX User | Nokia Germany | imported from 3GU |
S1‑192209 | TS22.263_DualConnectivity | EBU | imported from 3GU |
S1‑192210 | TS22.263_PerformanceRequirements | EBU | imported from 3GU |
S1‑192211 | TS22.263_ServiceRequirements | EBU | imported from 3GU |
S1‑192212 | Clarification of treatment of private call and private emergency calls to functional aliases activated by more than one MCX User | Nokia Germany | imported from 3GU |
S1‑192213 | FS_REFEC_Proposed requirement text related to QoS | Philips International B.V. | imported from 3GU |
S1‑192214 | FS_eCAV Industrial Wireless Sensors for process and asset monitoring | Ericsson | imported from 3GU |
S1‑192215 | TR 22.854 v1.1.0 Clean-up | Perspecta Labs Inc., CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192216 | FS_CMED Use Case Mobile Specialist Practice | Siemens AG | imported from 3GU |
S1‑192217 | eCAV – Service performance requirements for Industrial Wireless Sensors | Ericsson | imported from 3GU |
S1‑192218 | Support the FRMCS use case for Arbitration while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192219 | TR 22.854: Additional MPS for DTS requirements and clarifications | Perspecta Labs, CISA ECD, AT&T, T-Mobile USA, Verizon | imported from 3GU |
S1‑192220 | New WID on Asset Tracking for 5G | NOVAMINT | imported from 3GU |
S1‑192221 | TR 22.854: Additional Requirements for MPS Video | Perspecta Labs, CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192222 | Draft Reply LS on authentication of group of IoT devices | Qualcomm communications-France | imported from 3GU |
S1‑192223 | TR 22.854: Additional MPS voice requirements and new use case on MMTEL voice conference host invocation of MPS for all participants | Perspecta Labs, CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192224 | Use of sidelink for process monitoring and plant asset management | Qualcomm communications-France | imported from 3GU |
S1‑192225 | TR 22.854: Modifications to QoS requirements [PR.6.8.6-002] and [PR.6.8.6-005] | Perspecta Labs, CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192226 | Consolidation of sidelink requirements for TR 22.832 | Qualcomm communications-France | imported from 3GU |
S1‑192227 | Indirect communication for industrial applications | Qualcomm communications-France | imported from 3GU |
S1‑192228 | Clarifications on UAS terminology and model | Qualcomm communications-France | imported from 3GU |
S1‑192229 | Various clarifications in MUSIM | Charter Communications, Inc, vivo Mobile Communications Co. Ltd | imported from 3GU |
S1‑192230 | Draft Reply LS on UAS-related terminology and model | Qualcomm communications-France | imported from 3GU |
S1‑192231 | Common MPS Voice, Video and Data updates based on TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD,Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192232 | Support the location services related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192233 | Draft Reply LS on UAC for NB-IoT | Qualcomm communications-France | imported from 3GU |
S1‑192234 | Clarification on MUSIM UE handling requirements | Charter Communications, Inc, vivo Mobile Communications Co. Ltd | imported from 3GU |
S1‑192235 | FS_eCAV resolution of questions in clause 4.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192236 | MPS service specific updates based on TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192237 | 22.261 - Asset Tracking Description and Requirements | NOVAMINT | imported from 3GU |
S1‑192238 | Definition of absolute and relative positioning | Fraunhofer IIS | imported from 3GU |
S1‑192239 | FS_CMED_Integrity protection of medical data at very high datarates | Philips International B.V. | imported from 3GU |
S1‑192240 | KPIs for Asset Tracking in 5G system | NOVAMINT | imported from 3GU |
S1‑192241 | Definition of absolute and relative positioning | Fraunhofer IIS | imported from 3GU |
S1‑192242 | FS_eCAV – merged potential service requirements – Positioning | Fraunhofer IIS | imported from 3GU |
S1‑192243 | FS_eCAV – merged potential service requirements – Industrial Ethernet integration | Siemens | imported from 3GU |
S1‑192244 | eCAV – further 5G service requirements for industrial Ethernet integration (clock synchronization, time-sensitive communication) | Siemens | imported from 3GU |
S1‑192245 | Support the recording of communication related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192246 | FS_eCAV – merged potential service requirements – Non-public Networks | Siemens | imported from 3GU |
S1‑192247 | Update gap analysis for requirements in subclause 6.18 Train Integrity monitoring data communication related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192248 | Normative work to update TS 22.153 based on the conclusions of TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192249 | eCSPOR CON requirement | Convida Wireless | imported from 3GU |
S1‑192250 | Proposal for Different Access Control Treatment for IMS signalling | Intel | imported from 3GU |
S1‑192251 | Removing solution specific requirements | vivo Mobile Communication Co., Charter Communications Inc, LG Electronics | imported from 3GU |
S1‑192252 | FS_CMED_Updates related to cardiac telemetry monitoring | Philips International B.V. | imported from 3GU |
S1‑192253 | Enhanced access control for IMS registration related signalling | Intel | imported from 3GU |
S1‑192254 | Enhanced access control for IMS registration realted signalling | Intel | imported from 3GU |
S1‑192255 | FS_eCAV – merged potential service requirements –Network operation and maintenance | Siemens, Huawei Technologies | imported from 3GU |
S1‑192256 | eCAV – further 5G service requirements for network operation and management | Siemens, Huawei Technologies | imported from 3GU |
S1‑192257 | New WID on ... multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192258 | MuD user preferences | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192259 | E911 requirements for SNPN | Charter Communications, Inc | imported from 3GU |
S1‑192260 | Emergency service requirement for Non-Public Network | Charter Communications, Inc | imported from 3GU |
S1‑192261 | Clarification on MUSIM service categories | Qualcomm communications-France | imported from 3GU |
S1‑192262 | Clarification on MUSIM paging collision | Qualcomm communications-France | imported from 3GU |
S1‑192263 | Way Forward Proposal for SA1 FS_MUSIM SI and MUSIM WI | Intel | imported from 3GU |
S1‑192264 | Clarification on MUSIM terminology | Qualcomm communications-France | imported from 3GU |
S1‑192265 | FS_eCAV – merged potential service requirements – Network performance | Siemens | imported from 3GU |
S1‑192266 | Release 17 RAN work areas, and SA1 related items | KPN N.V. | imported from 3GU |
S1‑192267 | eCAV – further 5G service requirements for network performance | Siemens | imported from 3GU |
S1‑192268 | Corrections to References | Airbus DS SLC, Qualcomm Incorporated | imported from 3GU |
S1‑192269 | Corrections to Definitions and Abbreviations | Airbus DS SLC, Qualcomm Incorporated | imported from 3GU |
S1‑192270 | Corrections to Requirements | Airbus DS SLC, Qualcomm Incorporated | imported from 3GU |
S1‑192271 | FS_eCAV – merged potential service requirements – ProSe Communication for CAV | Siemens | imported from 3GU |
S1‑192272 | Consolidated potential service requirements on positioning | ETRI | imported from 3GU |
S1‑192273 | eCAV – further 5G service requirements for ProSe communication for CAV | Siemens | imported from 3GU |
S1‑192274 | eCAV – further 5G service requirements for ProSe communication for CAV | Siemens | imported from 3GU |
S1‑192275 | Correction of a figure number in Annex D.2 | ETRI | imported from 3GU |
S1‑192276 | FS_eCAV – Update use case “Cooperative carrying of work pieces” | Siemens | imported from 3GU |
S1‑192277 | Correction of a figure number in Annex D.2 | ETRI | imported from 3GU |
S1‑192278 | FS_REFEC Considerations | KPN | imported from 3GU |
S1‑192279 | Deletion of positioning performance requirements | ETRI | imported from 3GU |
S1‑192280 | Deletion of positioning performance requirements | ETRI | imported from 3GU |
S1‑192281 | Modification of positioning service and high accuracy positioning | ETRI | imported from 3GU |
S1‑192282 | Revision of WID on service requirements on enhancements for cyber-physical control applications in vertical domains (eCAV) | Siemens | imported from 3GU |
S1‑192283 | Add a new positioning performance requirement | ETRI | imported from 3GU |
S1‑192284 | revised SID: Study on enhancements for cyber-physical control applications in vertical domains (FS_eCAV) | Siemens | imported from 3GU |
S1‑192285 | Considerations for SA1 Process Improvement: Unanswered LS in Time | LG Electronics Deutschland | imported from 3GU |
S1‑192286 | eCSPOR req | Convida Wireless | imported from 3GU |
S1‑192287 | Clarifications for KPIs on Low latency and high reliability scenarios | LG Electronics Deutschland | imported from 3GU |
S1‑192288 | Discussion paper on Clarification CR for KPIs on Low latency and high reliability scenarios | LG Electronics Deutschland | imported from 3GU |
S1‑192289 | FS_eCAV – TR 22.832 – Update Use Case Mobile Operation Panel | Siemens | imported from 3GU |
S1‑192290 | FS_eCAV – Clustering of potential 5G service requirements | Siemens | imported from 3GU |
S1‑192291 | FS_eCAV – Clustering of potential 5G service requirements | Siemens | imported from 3GU |
S1‑192292 | TR 22.832 – Overview section | Siemens | imported from 3GU |
S1‑192293 | TR 22.832 – Introduction subclause for use case chapter | Siemens | imported from 3GU |
S1‑192294 | TR 22.832 – Conclusion section | Siemens | imported from 3GU |
S1‑192295 | Motivation for revision of Work Item eCAV on cyberCAV topics | Siemens | imported from 3GU |
S1‑192296 | New study on Supporting of Railway Smart Station Services (FS_RAILSS) | Hansung University | imported from 3GU |
S1‑192297 | Gap analysis for 9.13 Autonomous Train Control and Operation | Hansung University | imported from 3GU |
S1‑192298 | Gap analysis for 9.14 Vertual Coupling | Hansung University | imported from 3GU |
S1‑192299 | Gap analysis for 9.15 Composite-based train operation | Hansung University | imported from 3GU |
S1‑192300 | Gap analysis for Private call priority during internetworking with LMR | Hansung University | imported from 3GU |
S1‑192301 | Reply LS on APN storage in USIM | S2-1906034 | imported from 3GU |
S1‑192302 | LS on IMS voice over 5GS | S2-1906791 | imported from 3GU |
S1‑192303 | LS on RAN sharing and Emergency services with Non-Public Networks | S2-1906814 | imported from 3GU |
S1‑192304 | LS on maximum value of MDBV | S2-1907955 | imported from 3GU |
S1‑192305 | Reply LS on unified access control in SNPNs (Stand-alone Non-Public Networks) | S2-1908331 | imported from 3GU |
S1‑192306 | LS on GSMA NG-116 GST-related Work in SA2 | S2-1908591 | imported from 3GU |
S1‑192307 | LS on network slice constraint requirement clarification | S2-1908592 | imported from 3GU |
S1‑192308 | Reply LS on authentication of group of IoT devices | S2-1908632 | imported from 3GU |
S1‑192309 | Reply LS to on authentication of group of IoT devices | S3-191601 | imported from 3GU |
S1‑192310 | Reply LS on Authentication for UEs not Supporting NAS | S3-191713 | imported from 3GU |
S1‑192311 | LS on Reporting all Cell IDs in 5G | S3i190461 | imported from 3GU |
S1‑192312 | LS on C-V2X Sensor Sharing of Media and Object Information | S4-190795 | imported from 3GU |
S1‑192313 | LS on UAS-related terminology and model | S6-191612 | imported from 3GU |
S1‑192314 | LS on the call for proposals for an internationally agreed Vehicular Multimedia Architecture | ITU FGVM-LS007 | imported from 3GU |
S1‑192315 | LS on the scope of study/work item on support for multi-USIM devices (FS_MUSIM/MUSIM) | SP-190573 | imported from 3GU |
S1‑192316 | LS on unified access control in SNPNs (Stand-alone Non-Public Networks) | C1-193504 | imported from 3GU |
S1‑192317 | LS on UAC for NB-IoT | R2-1908263 | imported from 3GU |
S1‑192318 | GTP Recovery Counter & GSN node behaviour | GSMA RIFS Doc 78_04 | imported from 3GU |
S1‑192319 | Introduction of Study on Supporting of Railway Smart Station Services (FS_RAILSS) | Hansung University | imported from 3GU |
S1‑192320 | TR 21.915 v.1.2.0 on Rel-15 Description | MCC | imported from 3GU |
S1‑192321 | LS on enhanced access control for IMS signalling | C1-1911681/S1-191210 | imported from 3GU |
S1‑192322 | LS on the update of 3GPP Release 16 Stage 1 MARCOM standardization | Iala C/IM/3GPP/19-102/S1-191282 | imported from 3GU |
S1‑192323 | LS on presentation of the work carried out by STF 547 | SmartM2M(19)051003 | imported from 3GU |
S1‑192324 | FS_AVPROD – Status report | EBU | imported from 3GU |
S1‑192325 | FS_MPS2 – Status report | Vencore Labs | imported from 3GU |
S1‑192326 | Cover page for TR 22.831 on FS_CMED | b<>com | imported from 3GU |
S1‑192327 | FS_5G_ATRAC – Status report | Novamint | imported from 3GU |
S1‑192328 | FS_REFEC – Status report | KPN | imported from 3GU |
S1‑192329 | FS_EAV – Status report | China Unicom | imported from 3GU |
S1‑192330 | FS_MINT – Status report | LG | imported from 3GU |
S1‑192331 | FS_MUSIM – Status report | Intel | imported from 3GU |
S1‑192332 | FS_eCAV – Status report | Siemens | imported from 3GU |
S1‑192333 | FS_FRMCS3 – Status report | UIC | imported from 3GU |
S1‑192334 | NCIS – Status report | OPPO | imported from 3GU |
S1‑192335 | AVPROD – Status report | EBU | imported from 3GU |
S1‑192336 | MPS2 – Status report | Vencore Labs | imported from 3GU |
S1‑192337 | CMED – Status report | b<>com | imported from 3GU |
S1‑192338 | REFEC – Status report | Novamint | imported from 3GU |
S1‑192339 | EAV – Status report | KPN | imported from 3GU |
S1‑192340 | MUSIM – Status report | Intel | imported from 3GU |
S1‑192341 | eCAV – Status report | Siemens | imported from 3GU |
S1‑192342 | MONASTERYEND – Status report | UIC | imported from 3GU |
S1‑192343 | TR22.827v1.2.0 to include agreements at this meeting | Rapporteur (EBU) | imported from 3GU |
S1‑192344 | Cover page for presentation of TR22.827v1.2.0 | Rapporteur (EBU) | imported from 3GU |
S1‑192345 | AVPROD+CMED drafting agenda | Session Chair | imported from 3GU |
S1‑192346 | AVPROD+CMED drafting report | Session Chair | imported from 3GU |
S1‑192347 | TR 22.854v1.2.0 to include agreements at this meeting | Rapporteur (Perspecta Labs) | imported from 3GU |
S1‑192348 | Cover page for presentation of TR22.854v1.2.0 | Rapporteur (Perspecta Labs) | imported from 3GU |
S1‑192349 | TR 22.826v1.1.0 to include agreements at this meeting | Rapporteur (b<>com) | imported from 3GU |
S1‑192350 | Cover page for presentation of TR 22.826v1.1.0 | Rapporteur (b<>com) | imported from 3GU |
S1‑192351 | TR22.836v0.3.0 to include agreements at this meeting | Rapporteur (Novamint) | imported from 3GU |
S1‑192352 | Cover page for presentation of TR22.836v0.3.0 | Rapporteur (Novamint) | imported from 3GU |
S1‑192353 | REFEC+ATRAC drafting agenda | Session Chair | imported from 3GU |
S1‑192354 | REFEC+ATRAC drafting report | Session Chair | imported from 3GU |
S1‑192355 | TR22.866v0.3.0 to include agreements at this meeting | Rapporteur (KPN) | imported from 3GU |
S1‑192356 | Cover page for presentation of TR22.866v0.3.0 | Rapporteur (KPN) | imported from 3GU |
S1‑192357 | TR22.829v0.4.0 to include agreements at this meeting | Rapporteur (China Unicom) | imported from 3GU |
S1‑192358 | Cover page for presentation of TR22.829v0.4.0 | Rapporteur (China Unicom) | imported from 3GU |
S1‑192359 | EAV drafting agenda | Session Chair | imported from 3GU |
S1‑192360 | EAV drafting report | Session Chair | imported from 3GU |
S1‑192361 | TR22.831v0.2.0 to include agreements at this meeting | Rapporteur (LG Electronics) | imported from 3GU |
S1‑192362 | Cover page for presentation of TR22.831v0.2.0 | Rapporteur (LG Electronics) | imported from 3GU |
S1‑192363 | NCIS+MINT drafting agenda | Session Chair | imported from 3GU |
S1‑192364 | NCIS+MINT drafting report | Session Chair | imported from 3GU |
S1‑192365 | MUSIM drafting agenda | Session Chair | imported from 3GU |
S1‑192366 | MUSIM drafting report | Session Chair | imported from 3GU |
S1‑192367 | TR22.832v1.1.0 to include agreements at this meeting | Rapporteur (Siemens) | imported from 3GU |
S1‑192368 | Cover page for presentation of TR22.832v1.1.0 | Rapporteur (Siemens) | imported from 3GU |
S1‑192369 | eCAV drafting agenda | Session Chair | imported from 3GU |
S1‑192370 | eCAV drafting report | Session Chair | imported from 3GU |
S1‑192371 | Railway drafting agenda | Session Chair | imported from 3GU |
S1‑192372 | Railway drafting report | Session Chair | imported from 3GU |
S1‑192373 | TS22.263v0.1.0 to include agreements at this meeting | Rapporteur (EBU) | imported from 3GU |
S1‑192374 | Cover page for presentation of TS22.263v0.1.0 | Rapporteur (EBU) | imported from 3GU |
S1‑192375 | Update gap analysis for requirements in subclause 12 FRMCS System principles related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192376 | Discussion paper on application of STIR/SHAKEN to Emergency and Callback Calls | AT&T, Ericsson, T-Mobile USA Inc | imported from 3GU |
S1‑192377 | New WID on Enhanced Calling Name (eCNAM) Analytics Interworking ( eCNAM_An) | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192378 | Enhanced Calling Name (eCNAM) Analytics Interworking | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192379 | Way Forward Proposal for SA1 FS_MUSIM SI and MUSIM WI | Intel | imported from 3GU |
S1‑192380 | 22.261 - Asset Tracking Description and Requirements | NOVAMINT | imported from 3GU |
S1‑192381 | KPIs for Asset Tracking in 5G system | NOVAMINT | imported from 3GU |
S1‑192382 | FS_REFEC – TR Overview section | KPN | imported from 3GU |
S1‑192383 | FS_REFEC Considerations | KPN | imported from 3GU |
S1‑192384 | Not used | Reserved Chair | imported from 3GU |
S1‑192385 | Not used | Reserved Chair | imported from 3GU |
S1‑192386 | Not used | Reserved Chair | imported from 3GU |
S1‑192387 | Not used | Reserved Chair | imported from 3GU |
S1‑192388 | Not used | Reserved Chair | imported from 3GU |
S1‑192389 | Not used | Reserved Chair | imported from 3GU |
S1‑192390 | Reply LS on Use Cases for eXtended Reality (XR) in 5G | S4-190972 | imported from 3GU |
S1‑192391 | Reply LS on Medical Video Bitrates | S4-191073 | imported from 3GU |
S1‑192392 | FS_eCAV – merged potential service requirements – Network performance | Siemens | imported from 3GU |
S1‑192393 | eCAV – further 5G service requirements for network performance | Siemens | imported from 3GU |
S1‑192394 | FS_eCAV – Update use case “Cooperative carrying of work pieces” | Siemens | imported from 3GU |
S1‑192395 | FS_eCAV – TR 22.832 – Update Use Case Mobile Operation Panel | Siemens | imported from 3GU |
S1‑192396 | Motivation for revision of Work Item eCAV on cyberCAV topics | Siemens | imported from 3GU |
S1‑192397 | Minutes of SA1#86 | MCC | imported from 3GU |
S1‑192398 | Release 17 RAN work areas, and SA1 related items | KPN N.V. | imported from 3GU |
S1‑192399 | Clarification of geographic constraint on a network slice | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192400 | Reply LS to SA2 on network slice constraint requirement clarification | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192401 | Clarification of geographic constraint on a network slice | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192402 | CR for Rel-16 TS 22.119 Clarification and editorial updates | SyncTechno Inc. | imported from 3GU |
S1‑192403 | [DRAFT] Reply LS on IAIA liaison on the update of 3GPP Release 16 Stage 1 MARCOM standardization | SyncTechno Inc. | imported from 3GU |
S1‑192404 | Draft Reply LS to RAN2 (cc CT1, SA2, RAN3) on UAC for NB-IoT | Qualcomm communications-France | imported from 3GU |
S1‑192405 | new WID: Support for Minimization of service Interruption (MINT) | LG Electronics, Samsung, KT Corp, KRRI, SK Telecom, LG Uplus, ITL | imported from 3GU |
S1‑192406 | Draft Reply LS on UAS-related terminology and model | Qualcomm communications-France | imported from 3GU |
S1‑192407 | Clarify requirements for bulk IoT operation and authentication | Qualcomm communications-France | imported from 3GU |
S1‑192408 | Reply LS to SA2, SA3 on authentication of group of IoT devices | China Mobile Com. Corporation | imported from 3GU |
S1‑192409 | new WID: Support for Minimization of service Interruption (MINT) | LG Electronics, Samsung, KT Corp, KRRI, SK Telecom, LG Uplus, ITL | imported from 3GU |
S1‑192410 | FS_eCAV – Consolidate service requirements on Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192411 | FS_eCAV – merged potential service requirements – Positioning | Fraunhofer IIS | imported from 3GU |
S1‑192412 | Definition of absolute and relative positioning | Fraunhofer IIS | imported from 3GU |
S1‑192413 | Definition of absolute and relative positioning | Fraunhofer IIS | imported from 3GU |
S1‑192414 | Use of sidelink for process monitoring and plant asset management | Qualcomm communications-France | imported from 3GU |
S1‑192415 | TR 22.832 – Overview section | Siemens | imported from 3GU |
S1‑192416 | FS_eCAV resolution of questions in clause 4.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192417 | FS_eCAV: survival time vs. consecutive message loss | VODAFONE Group Plc | imported from 3GU |
S1‑192418 | TR 22.832 – Introduction subclause for use case chapter | Siemens | imported from 3GU |
S1‑192419 | FS_eCAV - Support to application layer for Cooperative carrying of work pieces | ZTE | imported from 3GU |
S1‑192420 | FS_eCAV - Support to application layer for Energy efficiency | ZTE | imported from 3GU |
S1‑192421 | FS_eCAV - Support to application layer for Integration with TSN networks | ZTE | imported from 3GU |
S1‑192422 | FS_eCAV - Support to application layer for Merging of working clock domains | ZTE | imported from 3GU |
S1‑192423 | FS_eCAV - Support to application layer for Mobile Operation Panel | ZTE | imported from 3GU |
S1‑192424 | FS_eCAV - Support to application layer for Providing vertical positioning | ZTE | imported from 3GU |
S1‑192425 | FS_eCAV TSN Reliability enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192426 | FS_eCAV multi-connectivity for robotic automation | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192427 | Definition of absolute and relative positioning | Fraunhofer IIS | imported from 3GU |
S1‑192428 | FS_eCAV – Update use case “Integration of 5G networks with TSN networks (time synchronization)” | Siemens AG | imported from 3GU |
S1‑192429 | FS_eCAV – Update use case “Cooperative carrying of work pieces” | Siemens | imported from 3GU |
S1‑192430 | FS_eCAV – TR 22.832 – Update Use Case Mobile Operation Panel | Siemens | imported from 3GU |
S1‑192431 | Clarification and pCR for Communication monitoring for CAV applications | Tencent | imported from 3GU |
S1‑192432 | Clarification and pCR for Cooperative carrying of work pieces | Tencent | imported from 3GU |
S1‑192433 | FS_eCAV TSN Reliability enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192434 | FS_eCAV multi-connectivity for robotic automation | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192435 | Non-public networks as private slices | CATT | imported from 3GU |
S1‑192436 | FS_eCAV - Wired to wireless link replacement for Industry 4.0 | Siemens AG | imported from 3GU |
S1‑192437 | FS_eCAV – Use Case Flexible Manufacturing | Siemens AG | imported from 3GU |
S1‑192438 | FS_eCAV Industrial Wireless Sensors for process and asset monitoring | Ericsson | imported from 3GU |
S1‑192439 | FS_eCAV – merged potential service requirements – Industrial Ethernet integration | Siemens | imported from 3GU |
S1‑192440 | FS_eCAV – merged potential service requirements – Non-public Networks | Siemens | imported from 3GU |
S1‑192441 | Merged potential service requirements: Non-public networks as private slices | CATT | imported from 3GU |
S1‑192442 | FS_eCAV – merged potential service requirements –Network operation and maintenance | Siemens, Huawei Technologies | imported from 3GU |
S1‑192443 | FS_eCAV – merged potential service requirements – Network performance | Siemens | imported from 3GU |
S1‑192444 | FS_eCAV – Consolidate service requirements on Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192445 | FS_eCAV – merged potential service requirements – Positioning | Fraunhofer IIS | imported from 3GU |
S1‑192446 | FS_eCAV – merged potential service requirements – ProSe Communication for CAV | Siemens | imported from 3GU |
S1‑192447 | Consolidation of sidelink requirements for TR 22.832 | Qualcomm communications-France | imported from 3GU |
S1‑192448 | TR 22.832 – Conclusion section | Siemens | imported from 3GU |
S1‑192449 | FS_eCAV: Industrial communication network architecture | VODAFONE Group Plc, Ericsson | imported from 3GU |
S1‑192450 | FS_eCAV: communication service availability vs. failure | VODAFONE Group Plc | imported from 3GU |
S1‑192451 | Network operation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192452 | eCAV – Further 5G service requirements for Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192453 | FS_eCAV – Consolidate service requirements on Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192454 | eCAV – further 5G service requirements for wired to wireless link replacement for smart manufacturing / Industry 4.0 | Siemens AG | imported from 3GU |
S1‑192455 | eCAV – Service performance requirements for Industrial Wireless Sensors | Ericsson | imported from 3GU |
S1‑192456 | eCAV – further 5G service requirements for industrial Ethernet integration (clock synchronization, time-sensitive communication) | Siemens | imported from 3GU |
S1‑192457 | eCAV – further 5G service requirements for network performance | Siemens | imported from 3GU |
S1‑192458 | eCAV – further 5G service requirements for ProSe communication for CAV | Siemens | imported from 3GU |
S1‑192459 | Clarification and pCR for Communication monitoring for CAV applications | Tencent | imported from 3GU |
S1‑192460 | Definition of absolute and relative positioning | Fraunhofer IIS | imported from 3GU |
S1‑192461 | eCAV – further 5G service requirements for network operation and management | Siemens, Huawei Technologies | imported from 3GU |
S1‑192462 | FS_eCAV - Wired to wireless link replacement for Industry 4.0 | Siemens AG | imported from 3GU |
S1‑192463 | Use of sidelink for process monitoring and plant asset management | Qualcomm communications-France | imported from 3GU |
S1‑192464 | FS_eCAV – Consolidate service requirements on Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192465 | eCAV – Further 5G service requirements for Positioning | eCAV – Further 5G service requirements for Positioning | imported from 3GU |
S1‑192466 | Not used | Reserved Toon (eCAV) | imported from 3GU |
S1‑192467 | Not used | Reserved Toon (eCAV) | imported from 3GU |
S1‑192468 | Not used | Reserved Toon (eCAV) | imported from 3GU |
S1‑192469 | Not used | Reserved Toon (eCAV) | imported from 3GU |
S1‑192470 | Clarification and pCR to TR 22.827 on AVProd | Tencent | imported from 3GU |
S1‑192471 | TR22.827_EditorialChanges | EBU | imported from 3GU |
S1‑192472 | Clarification and pCR to TR 22.827 on AVProd | Tencent | imported from 3GU |
S1‑192473 | TR22.827_ConsolidatedDualConnectivity | EBU | imported from 3GU |
S1‑192474 | TR22.827_ConsolidatedRequirements | EBU | imported from 3GU |
S1‑192475 | TR 22.826 final clean up | B-Com | imported from 3GU |
S1‑192476 | Addition of a synchronisation requirement in use case 5.3.3 (Communication QoS requirement for robotic telesurgery) | B-Com | imported from 3GU |
S1‑192477 | consolidation for clock synchronization in TR 22.826 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192478 | FS_CMED_Integrity protection of medical data at very high datarates | Philips International B.V. | imported from 3GU |
S1‑192479 | Addition of Conclusion and recommendations section in TR 22.826 | B-Com | imported from 3GU |
S1‑192480 | TS22.263_MainBody | EBU | imported from 3GU |
S1‑192481 | CR to 22.829 Correction to potential Consolidated Requirements for UAV | LG Electronics | imported from 3GU |
S1‑192482 | CR to 22.829 Additional Consolidated Requirements for UAV | LG Electronics | imported from 3GU |
S1‑192483 | Processing of editor note of TR 22.829 | China Unicom | imported from 3GU |
S1‑192484 | CR to 22.829 supplement service experience assurance requirements for UAV | China Unicom | imported from 3GU |
S1‑192485 | Clarifications on UAS terminology and model | Airbus, Qualcomm, Verizon UK Ltd | imported from 3GU |
S1‑192486 | General descriptions of network controlled interactive service | China Telecom, OPPO, Samsung, Tencent | imported from 3GU |
S1‑192487 | Performance requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192488 | Service hosting environment aspects of interactive service | OPPO, Samsung, Tencent | imported from 3GU |
S1‑192489 | Performance requirements of interactive service | Huawei, Huawei Device,China Telecom | imported from 3GU |
S1‑192490 | Update consolidation of 6.2 section | Huawei,Huawei Device, China Telecom | imported from 3GU |
S1‑192491 | Use case update of section 5.2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
S1‑192492 | FS_MINT: General update on TR22.831 V0.1.0 | LG Electronics | imported from 3GU |
S1‑192493 | 23.831 P-CR: MINT Scope | Samsung, LG Electronics | imported from 3GU |
S1‑192494 | FS_MINT: Text proposal for Overview | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192495 | update the potential requirement for section 5.3 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192496 | FS_MINT: Update of Section 5.8 | LG Electronics, KT Corp, LG Uplus | imported from 3GU |
S1‑192497 | FS_MINT: Update of Section 5.2 and 5.9 | LG Electronics, LG Uplus, KT Corp | imported from 3GU |
S1‑192498 | update the potential requirement for section 5.10 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192499 | Introduction of Minimization of Service Interruption (MINT) | Samsung, LG Electronics | imported from 3GU |
S1‑192500 | FS_MINT: Consolidation of Potential Requirements for TR22.831 | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192501 | TS22.263_DualConnectivity | EBU | imported from 3GU |
S1‑192502 | TS22.263_PerformanceRequirements | EBU | imported from 3GU |
S1‑192503 | TS22.263_ServiceRequirements | EBU | imported from 3GU |
S1‑192504 | FS_CMED_Updates related to cardiac telemetry monitoring | Philips International B.V. | imported from 3GU |
S1‑192505 | FS_CMED Use Case Mobile Specialist Practice | Siemens AG | imported from 3GU |
S1‑192506 | TS22.263_ServiceRequirements | EBU | imported from 3GU |
S1‑192507 | TS22.263_DualConnectivity | EBU | imported from 3GU |
S1‑192508 | TS22.263_PerformanceRequirements | EBU | imported from 3GU |
S1‑192509 | TS22.263_MainBody | EBU | imported from 3GU |
S1‑192510 | Addition of security requirements for critical medical applications | B-Com, Vodafone | imported from 3GU |
S1‑192511 | Addition of medical telemetry requirements | B-Com, Philips | imported from 3GU |
S1‑192512 | Clarification and pCR to TR 22.827 on AVProd | Tencent | imported from 3GU |
S1‑192513 | Addition of a new synchronisation performance requirement | B-Com, Huawei | imported from 3GU |
S1‑192514 | TR22.827_EditorialChanges | EBU | imported from 3GU |
S1‑192515 | Addition of robotic aided surgery and diagnosis performance requirements | B-Com | imported from 3GU |
S1‑192516 | TR22.827_ConsolidatedDualConnectivity | EBU | imported from 3GU |
S1‑192517 | TR22.827_ConsolidatedRequirements | EBU | imported from 3GU |
S1‑192518 | Performance requirements of interactive service | Huawei, Huawei Device,China Telecom | imported from 3GU |
S1‑192519 | Performance requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192520 | Group operation related requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192521 | Use case update of section 5.2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
S1‑192522 | Update consolidation of 6.2 section | Huawei,Huawei Device, China Telecom | imported from 3GU |
S1‑192523 | Performance requirements of interactive service | Huawei, Huawei Device,China Telecom | imported from 3GU |
S1‑192524 | Definition and introduction of C2 Communication | Intel | imported from 3GU |
S1‑192525 | CR to 22.125 Network exposure requirements for UAV | China Unicom | imported from 3GU |
S1‑192526 | Corrections to Requirements | Airbus DS SLC, Qualcomm Incorporated | imported from 3GU |
S1‑192527 | Adding UxNB related requirements | ZTE Corporation, China Unicom, ZTE Trunking Technology Corp | imported from 3GU |
S1‑192528 | 22.125 CR of KPIs for UAV services | China Unicom | imported from 3GU |
S1‑192529 | CR to 22.125 service experience assurance requirements for UAV | China Unicom, ZTE, CATT | imported from 3GU |
S1‑192530 | Service restriction requirements for UAV | CATT, China Unicom, Huawei, ZTE | imported from 3GU |
S1‑192531 | General description for UAV aspects | China Unicom | imported from 3GU |
S1‑192532 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192533 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192534 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192535 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192536 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192537 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192538 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192539 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192540 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192541 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192542 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192543 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192544 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192545 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192546 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192547 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192548 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192549 | Not used | Reserved Ki-Dong | imported from 3GU |
S1‑192550 | ATRAC – TR Consolidated Requirements | NOVAMINT | imported from 3GU |
S1‑192551 | ATRAC – TR Consolidated KPIs | NOVAMINT | imported from 3GU |
S1‑192552 | 22.261 - Asset Tracking Description and Requirements | NOVAMINT | imported from 3GU |
S1‑192553 | KPIs for Asset Tracking in 5G system | NOVAMINT | imported from 3GU |
S1‑192554 | FS_REFEC – TR Overview section | KPN | imported from 3GU |
S1‑192555 | Update Use Case 5.1 for Enabling Access Control | Intel | imported from 3GU |
S1‑192556 | FS_REFEC_Proposed requirement text for network slicing. | Philips International B.V. | imported from 3GU |
S1‑192557 | FS_REFEC_Proposed requirement text related to QoS | Philips International B.V. | imported from 3GU |
S1‑192558 | FS_REFEC Coverage enhancements for delay tolerant data | Convida Wireless | imported from 3GU |
S1‑192559 | Clarification on security aspects | Intel | imported from 3GU |
S1‑192560 | Editorial Clean up | vivo Mobile Communication Co.,Qualcomm Incorporated | imported from 3GU |
S1‑192561 | Clarification on MUSIM terminology | Qualcomm communications-France | imported from 3GU |
S1‑192562 | Use case to ensure same service for MUSIM than in single SIM | Huawei, Huawei Device, | imported from 3GU |
S1‑192563 | Use case of data traffic convergence in MUSIM | China Telecom | imported from 3GU |
S1‑192564 | Clarification on consolidate service requirements in clause 8.1 | Intel | imported from 3GU |
S1‑192565 | Clarifying the ‘Separate Devices’ requirement in MUSIM | Samsung R&D Institute UK | imported from 3GU |
S1‑192566 | User preferences among MUSIMs | Beijing Xiaomi Mobile Software | imported from 3GU |
S1‑192567 | Power optimization requirement in MUSIM | China Telecommunications | imported from 3GU |
S1‑192568 | Update of traffic scenario: Freight wagons | KPN | imported from 3GU |
S1‑192569 | Update of traffic scenario: SmartFactory | KPN | imported from 3GU |
S1‑192570 | Update of traffic scenario: Metering use case | KPN | imported from 3GU |
S1‑192571 | Update of traffic scenario: Containers | KPN | imported from 3GU |
S1‑192572 | Update of traffic scenario: Freight wagons | KPN | imported from 3GU |
S1‑192573 | New traffic scenario: Public Safety | KPN | imported from 3GU |
S1‑192574 | New traffic scenario: Wearables | KPN | imported from 3GU |
S1‑192575 | Traffic Scenario - consolidation | KPN | imported from 3GU |
S1‑192576 | FS_REFEC – TR Consolidated Requirements | KPN | imported from 3GU |
S1‑192577 | FS_REFEC – TR Conclusion and recommendations | KPN | imported from 3GU |
S1‑192578 | Connectivity models description section updated. | KPN | imported from 3GU |
S1‑192579 | Connectivity models new functional requirements | KPN | imported from 3GU |
S1‑192580 | KPIs for UE to network relaying in 5G system | KPN | imported from 3GU |
S1‑192581 | Clarification on MUSIM UE handling requirements | Charter Communications, Inc, vivo Mobile Communications Co. Ltd | imported from 3GU |
S1‑192582 | Clarification on consolidate service requirements in clause 8.2 | Intel | imported from 3GU |
S1‑192583 | CR to 22.834 on MUSIM suspension | LG Electronics | imported from 3GU |
S1‑192584 | Clarification on emergency service requirements in section 8.3 | Intel, Qualcomm, Volkswagen AG, CMCC, Huawei, Huawei Device, LG | imported from 3GU |
S1‑192585 | Service requirements for enabling Multi-USIM devices support | Intel | imported from 3GU |
S1‑192586 | Support for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192587 | Not used | Reserved Greg | imported from 3GU |
S1‑192588 | Way Forward for MUSIM | Intel | imported from 3GU |
S1‑192589 | Way Forward for MUSIM | Intel | imported from 3GU |
S1‑192590 | Not used | Reserved Greg | imported from 3GU |
S1‑192591 | Not used | Reserved Greg | imported from 3GU |
S1‑192592 | Not used | Reserved Greg | imported from 3GU |
S1‑192593 | Not used | Reserved Greg | imported from 3GU |
S1‑192594 | Not used | Reserved Greg | imported from 3GU |
S1‑192595 | Not used | Reserved Greg | imported from 3GU |
S1‑192596 | Not used | Reserved Greg | imported from 3GU |
S1‑192597 | Not used | Reserved Greg | imported from 3GU |
S1‑192598 | Not used | Reserved Greg | imported from 3GU |
S1‑192599 | Not used | Reserved Greg | imported from 3GU |
S1‑192600 | Not used | Reserved Greg | imported from 3GU |
S1‑192601 | Not used | Reserved Greg | imported from 3GU |
S1‑192602 | Not used | Reserved Greg | imported from 3GU |
S1‑192603 | Not used | Reserved Greg | imported from 3GU |
S1‑192604 | Not used | Reserved Greg | imported from 3GU |
S1‑192605 | Not used | Reserved Greg | imported from 3GU |
S1‑192606 | Not used | Reserved Greg | imported from 3GU |
S1‑192607 | Not used | Reserved Greg | imported from 3GU |
S1‑192608 | Not used | Reserved Greg | imported from 3GU |
S1‑192609 | Not used | Reserved Greg | imported from 3GU |
S1‑192610 | Activate Location Information report of a specific FA in a certain area | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192611 | Support the FRMCS use case for Arbitration when a user is registered to multiple UEs | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192612 | Support the FRMCS use case for Arbitration | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192613 | Extend Functional Alias binding to MCX Service Private Communication | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192614 | Support the location services related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192615 | Support the recording of communication related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192616 | Enhance MCData generic capability with data pull service | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192617 | Additional broadcast regroup requirements | FirstNet | imported from 3GU |
S1‑192618 | CR22.280v17.0.0 Additional broadcast regroup requirements | FirstNet | imported from 3GU |
S1‑192619 | CR22.280v17.0.0 New additional broadcast regroup requirements | FirstNet | imported from 3GU |
S1‑192620 | Update gap analysis for requirements in subclause 6 Critical communication applications related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192621 | Update gap analysis for requirements in subclause 7 Performance communication applications related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192622 | Update gap analysis for requirements in subclause 9 Critical support applications related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192623 | Update gap analysis for requirements in subclause 12 FRMCS System principles related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192624 | Clarify CS/PS interworking versus interconnection between GSM-R and FRMCS users | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192625 | 3GPP building blocks to support Real-time video communication (video conferencing) related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192626 | TR 22.854: Additional MPS for DTS requirements and clarifications | Perspecta Labs, CISA ECD, AT&T, T-Mobile USA, Verizon | imported from 3GU |
S1‑192627 | TR 22.854: Additional Requirements for MPS Video | Perspecta Labs, CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192628 | TR 22.854: Additional MPS voice requirements and new use case on MMTEL voice conference host invocation of MPS for all participants | Perspecta Labs, CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192629 | TR 22.854: Modifications to QoS requirements [PR.6.8.6-002] and [PR.6.8.6-005] | Perspecta Labs, CISA ECD, Sprint, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192630 | Common MPS Voice, Video and Data updates based on TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD,Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192631 | MPS service specific updates based on TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192632 | Degradation of a communication link for AVC | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192633 | Update gap analysis for requirements in subclause 6.18 Train Integrity monitoring data communication related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192634 | Gap analysis for 9.14 Vertual Coupling | Hansung University | imported from 3GU |
S1‑192635 | Gap analysis for 9.15 Composite-based train operation | Hansung University | imported from 3GU |
S1‑192636 | Gap analysis for Private call priority during internetworking with LMR | Hansung University | imported from 3GU |
S1‑192637 | Activate Location Information report of a specific FA in a certain area | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192638 | CR22.280v17.0.0 New additional broadcast regroup requirements | FirstNet | imported from 3GU |
S1‑192639 | Drafting Group Agenda for MPS [FS_MPS2 + MPS2] | Session Chair | imported from 3GU |
S1‑192640 | MPS drafting report [FS_MPS2 + MPS2] | Session Chair | imported from 3GU |
S1‑192641 | Not used | Reserved Jose | imported from 3GU |
S1‑192642 | Not used | Reserved Jose | imported from 3GU |
S1‑192643 | Not used | Reserved Jose | imported from 3GU |
S1‑192644 | Not used | Reserved Jose | imported from 3GU |
S1‑192645 | Not used | Reserved Jose | imported from 3GU |
S1‑192646 | Not used | Reserved Jose | imported from 3GU |
S1‑192647 | Not used | Reserved Jose | imported from 3GU |
S1‑192648 | Not used | Reserved Jose | imported from 3GU |
S1‑192649 | Not used | Reserved Jose | imported from 3GU |
S1‑192650 | Not used | Reserved Jose | imported from 3GU |
S1‑192651 | Not used | Reserved Jose | imported from 3GU |
S1‑192652 | Not used | Reserved Jose | imported from 3GU |
S1‑192653 | Not used | Reserved Jose | imported from 3GU |
S1‑192654 | Not used | Reserved Jose | imported from 3GU |
S1‑192655 | Not used | Reserved Jose | imported from 3GU |
S1‑192656 | Not used | Reserved Jose | imported from 3GU |
S1‑192657 | Not used | Reserved Jose | imported from 3GU |
S1‑192658 | Not used | Reserved Jose | imported from 3GU |
S1‑192659 | Not used | Reserved Jose | imported from 3GU |
S1‑192660 | Not used | Reserved Jose | imported from 3GU |
S1‑192661 | Not used | Reserved Jose | imported from 3GU |
S1‑192662 | Not used | Reserved Jose | imported from 3GU |
S1‑192663 | Not used | Reserved Jose | imported from 3GU |
S1‑192664 | Not used | Reserved Jose | imported from 3GU |
S1‑192665 | Not used | Reserved Jose | imported from 3GU |
S1‑192666 | Not used | Reserved Jose | imported from 3GU |
S1‑192667 | Not used | Reserved Jose | imported from 3GU |
S1‑192668 | Not used | Reserved Jose | imported from 3GU |
S1‑192669 | Not used | Reserved Jose | imported from 3GU |
S1‑192670 | New WID on Asset Tracking for 5G (ATRAC) | NOVAMINT | imported from 3GU |
S1‑192671 | Revision of WID on service requirements on enhancements for cyber-physical control applications in vertical domains (eCAV) | Siemens | imported from 3GU |
S1‑192672 | revised SID: Study on enhancements for cyber-physical control applications in vertical domains (FS_eCAV) | Siemens | imported from 3GU |
S1‑192673 | Clarification of treatment of private call and private emergency calls to functional aliases activated by more than one MCX User | Nokia Germany | imported from 3GU |
S1‑192674 | Clarification of treatment of private call and private emergency calls to functional aliases activated by more than one MCX User | Nokia Germany | imported from 3GU |
S1‑192675 | New WID on Enhanced Calling Name (eCNAM) Analytics Interworking ( eCNAM_An) | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192676 | TR22.827_EditorialChanges | EBU | imported from 3GU |
S1‑192677 | Enhanced Calling Name (eCNAM) Analytics Interworking | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192678 | Enhancement for the 5G Control Plane Steering of Roaming for UE in CONNECTED mode | NTT DOCOMO INC. | imported from 3GU |
S1‑192679 | New WID on Enhancement for the 5G Control Plane Steering of Roaming for UE in CONNECTED mode (eCPSOR_CON) | NTT DOCOMO INC. | imported from 3GU |
S1‑192680 | New WID on broadcast / multicast requirements supporting Mission Critical Services in 5G (5MBS_eMC) | BDBOS | imported from 3GU |
S1‑192681 | Broadcast / multicast requirements supporting Mission Critical Services in 5G | BDBOS | imported from 3GU |
S1‑192682 | new SID - evolution of IMS multimedia telephony service (FS_eMMTEL) | China Mobile | imported from 3GU |
S1‑192683 | New WID on multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192684 | MuD user preferences | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192685 | New study on Supporting of Railway Smart Station Services (FS_RAILSS) | Hansung University | imported from 3GU |
S1‑192686 | Study on sharing administrative configuration between interconnected MCX systems (FS_SACI_MCS) | BDBOS | imported from 3GU |
S1‑192687 | Clarification of dynamic policy control requirements | Nokia, Nokia Shanghai Bell, Vodafone | imported from 3GU |
S1‑192688 | Clarifications for KPIs on Low latency and high reliability scenarios | LG Electronics Deutschland | imported from 3GU |
S1‑192689 | Clarification for end-to-end latency | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192690 | Adapting text to language settings | vivo Mobile Communication Co., | imported from 3GU |
S1‑192691 | eCAV – Further 5G service requirements for Positioning | Huawei Technologies Co. Ltd. | imported from 3GU |
S1‑192692 | Clarification for CSA requirements | Huawei | imported from 3GU |
S1‑192693 | Clarification of treatment of private call and private emergency calls to functional aliases activated by more than one MCX User | Nokia Germany | imported from 3GU |
S1‑192694 | Clarification of treatment of private call and private emergency calls to functional aliases activated by more than one MCX User | Nokia Germany | imported from 3GU |
S1‑192695 | Emergency service requirement for Non-Public Network | Charter Communications, Inc | imported from 3GU |
S1‑192696 | Correction of a figure number in Annex D.2 | ETRI | imported from 3GU |
S1‑192697 | Correction of a figure number in Annex D.2 | ETRI | imported from 3GU |
S1‑192698 | Modification of positioning service and high accuracy positioning | ETRI | imported from 3GU |
S1‑192699 | SA Prioritization of Rel-17 SA2 Items | 3GPP SA Chairman | imported from 3GU |
S1‑192700 | Addition of user broadcast regroup requirement | FirstNet | imported from 3GU |
S1‑192701 | Addition of user broadcast regroup requirement | FirstNet | imported from 3GU |
S1‑192703 | Release 17 RAN work areas, and SA1 related items | KPN N.V. | imported from 3GU |
S1‑192704 | Alignment of geographic constraint on a network slice | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192705 | Clarification of geographic constraint on a network slice | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192706 | Addition of Conclusion and recommendations section in TR 22.826 | B-Com | imported from 3GU |
S1‑192707 | LS to RAN2 (cc CT1, SA2, RAN3) on UAC for NB-IoT | Qualcomm communications-France | imported from 3GU |
S1‑192708 | Reply LS to SA2, SA3 on authentication of group of IoT devices | China Mobile Com. Corporation | imported from 3GU |
S1‑192709 | CR for Rel-16 TS 22.119 Clarification and editorial updates | SyncTechno Inc. | imported from 3GU |
S1‑192710 | LS on IAIA (cc SA) on the update of 3GPP Release 16 Stage 1 MARCOM standardization | SyncTechno Inc. | imported from 3GU |
S1‑192711 | new WID: Support for Minimization of service Interruption (MINT) | LG Electronics, Samsung, KT Corp, KRRI, SK Telecom, LG Uplus, ITL | imported from 3GU |
S1‑192712 | New WID on multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192713 | New WID on Asset Tracking for 5G (ATRAC) | NOVAMINT | imported from 3GU |
S1‑192714 | Revision of WID on service requirements on enhancements for cyber-physical control applications in vertical domains (eCAV) | Siemens | imported from 3GU |
S1‑192715 | New WID on Enhanced Calling Name (eCNAM) Analytics Interworking ( eCNAM_An) | Ericsson, AT&T, T-Mobile US | imported from 3GU |
S1‑192716 | Enhanced Calling Name (eCNAM) Analytics Interworking | Ericsson, AT&T, T-Mobile US, Charter Communications, Sprint, Verizon | imported from 3GU |
S1‑192717 | New WID on Enhancement for the 5G Control Plane Steering of Roaming for UE in CONNECTED mode (eCPSOR_CON) | NTT DOCOMO INC. | imported from 3GU |
S1‑192718 | Enhancement for the 5G Control Plane Steering of Roaming for UE in CONNECTED mode | NTT DOCOMO, T-Mobile USA, Perspecta Labs, Convida | imported from 3GU |
S1‑192719 | New WID on broadcast / multicast requirements supporting Mission Critical Services in 5G (5MBS_eMC) | BDBOS | imported from 3GU |
S1‑192720 | Broadcast / multicast requirements supporting Mission Critical Services in 5G | BDBOS, FirstNet, The Police of the Netherlands, MINISTERE DE L'INTERIEUR, Home Office, KPN | imported from 3GU |
S1‑192721 | new SID - evolution of IMS multimedia telephony service (FS_MMTELin5G) | China Mobile | imported from 3GU |
S1‑192722 | Study on sharing administrative configuration between interconnected MCX systems (FS_SACI_MCS) | BDBOS | imported from 3GU |
S1‑192723 | New WID on multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192724 | MuD user preferences | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192725 | Clarifications for KPIs on Low latency and high reliability scenarios | LG Electronics Deutschland | imported from 3GU |
S1‑192726 | Emergency service requirement for Non-Public Network | Charter Communications, Inc | imported from 3GU |
S1‑192727 | FS_REFEC Coverage enhancements for delay tolerant data | Convida Wireless | imported from 3GU |
S1‑192728 | Clarify requirements for group IoT authentication | Qualcomm, Vodafone | imported from 3GU |
S1‑192729 | Clarification for CSA requirements | Huawei, Siemens | imported from 3GU |
S1‑192730 | Common MPS Voice, Video and Data updates based on TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD,Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192731 | MPS service specific updates based on TR 22.854, MPS Phase 2 Feasibility Study | Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | imported from 3GU |
S1‑192732 | Clarify CS/PS interworking versus interconnection between GSM-R and FRMCS users | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192733 | 3GPP building blocks to support Real-time video communication (video conferencing) related use cases | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192734 | Gap analysis for 9.14 Vertual Coupling | Hansung University | imported from 3GU |
S1‑192735 | Gap analysis for 9.15 Composite-based train operation | Hansung University | imported from 3GU |
S1‑192736 | Clarify routing location dependent communications as part of handling MCX Service Private Communication requests | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192737 | Support the recording of communication related use cases while operating in off-network mode | Union Inter. Chemins de Fer | imported from 3GU |
S1‑192738 | Clarification and pCR to TR 22.827 on AVProd | Tencent | imported from 3GU |
S1‑192739 | TR22.827_ConsolidatedDualConnectivity | EBU | imported from 3GU |
S1‑192740 | TR22.827_ConsolidatedRequirements | EBU | imported from 3GU |
S1‑192741 | FS_CMED_Integrity protection of medical data at very high datarates | Philips International B.V. | imported from 3GU |
S1‑192742 | FS_eCAV - Support to application layer for Cooperative carrying of work pieces | ZTE | imported from 3GU |
S1‑192743 | FS_eCAV - Support to application layer for Energy efficiency | ZTE | imported from 3GU |
S1‑192744 | FS_eCAV - Support to application layer for Integration with TSN networks | ZTE | imported from 3GU |
S1‑192745 | FS_eCAV - Support to application layer for Merging of working clock domains | ZTE | imported from 3GU |
S1‑192746 | FS_CMED_Updates related to cardiac telemetry monitoring | Philips International B.V. | imported from 3GU |
S1‑192747 | TS22.263_MainBody | EBU | imported from 3GU |
S1‑192748 | TS22.263_ServiceRequirements | EBU | imported from 3GU |
S1‑192749 | TS22.263_DualConnectivity | EBU | imported from 3GU |
S1‑192750 | TS22.263_PerformanceRequirements | EBU, BBC, Sennheiser, b<>com | imported from 3GU |
S1‑192751 | Addition of robotic aided surgery and diagnosis performance requirements | B-Com | imported from 3GU |
S1‑192752 | FS_eCAV resolution of questions in clause 4.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192753 | FS_eCAV - Support to application layer for Cooperative carrying of work pieces | ZTE | imported from 3GU |
S1‑192754 | FS_eCAV - Support to application layer for Energy efficiency | ZTE | imported from 3GU |
S1‑192755 | FS_eCAV - Support to application layer for Integration with TSN networks | ZTE | imported from 3GU |
S1‑192756 | FS_eCAV - Support to application layer for Merging of working clock domains | ZTE | imported from 3GU |
S1‑192757 | FS_eCAV – Update use case “Cooperative carrying of work pieces” | Siemens | imported from 3GU |
S1‑192758 | FS_eCAV TSN Reliability enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192759 | FS_eCAV multi-connectivity for robotic automation | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192760 | Non-public networks as private slices | CATT | imported from 3GU |
S1‑192761 | Update consolidation of 6.2 section | Huawei,Huawei Device, China Telecom | imported from 3GU |
S1‑192762 | Use case update of section 5.2 | Huawei, Huawei Device, China Telecom | imported from 3GU |
S1‑192763 | Performance requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192764 | Group operation related requirements of interactive service | OPPO, Tencent | imported from 3GU |
S1‑192765 | Performance requirements of interactive service | Huawei, Huawei Device,China Telecom | imported from 3GU |
S1‑192766 | Summary of MUSIM drafting session | Intel | imported from 3GU |
S1‑192767 | update the potential requirement for section 5.3 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192768 | 23.831 P-CR: MINT HPLMN Failure is out of Scope | Samsung | imported from 3GU |
S1‑192769 | FS_MINT: Update of Section 5.8 | LG Electronics, KT Corp, LG Uplus | imported from 3GU |
S1‑192770 | FS_MINT: Update of Section 5.2 and 5.9 | LG Electronics, LG Uplus, KT Corp | imported from 3GU |
S1‑192771 | update the potential requirement for section 5.10 | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
S1‑192772 | FS_MINT: Consolidation of Potential Requirements for TR22.831 | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192773 | ATRAC – TR Consolidated KPIs | NOVAMINT | imported from 3GU |
S1‑192774 | 22.261 - Asset Tracking Description and Requirements | NOVAMINT | imported from 3GU |
S1‑192775 | Gap analysis for 9.14 Vertual Coupling | Hansung University | imported from 3GU |
S1‑192776 | Gap analysis for 9.15 Composite-based train operation | Hansung University | imported from 3GU |
S1‑192777 | KPIs for Asset Tracking in 5G system | NOVAMINT | imported from 3GU |
S1‑192778 | FS_REFEC – TR Overview section | KPN | imported from 3GU |
S1‑192779 | FS_REFEC_Proposed requirement text for network slicing. | Philips International B.V. | imported from 3GU |
S1‑192780 | Update of traffic scenario: SmartFactory | KPN | imported from 3GU |
S1‑192781 | Update of traffic scenario: InHome | KPN | imported from 3GU |
S1‑192782 | Update of traffic scenario: Containers | KPN | imported from 3GU |
S1‑192783 | Update of traffic scenario: Freight wagons | KPN | imported from 3GU |
S1‑192784 | New traffic scenario: Wearables | KPN | imported from 3GU |
S1‑192785 | Update Use Case 5.1 for Enabling Access Control | Intel | imported from 3GU |
S1‑192786 | Support of Emergency Services for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192787 | Clarification on consolidate service requirements in clause 8.1 | Intel | imported from 3GU |
S1‑192788 | Reply LS on eAC for IMS signalling | Huawei, KDDI, NTT DOCOMO | imported from 3GU |
S1‑192789 | Processing of editor note of TR 22.829 | China Unicom, Futurewei | imported from 3GU |
S1‑192790 | CR to 22.829 supplement service experience assurance requirements for UAV | China Unicom | imported from 3GU |
S1‑192791 | Definition and introduction of C2 Communication | Intel | imported from 3GU |
S1‑192792 | Clarifications on UAS terminology and model | Airbus, Qualcomm, Verizon UK Ltd | imported from 3GU |
S1‑192793 | CR to 22.125 Network exposure requirements for UAV | China Unicom | imported from 3GU |
S1‑192794 | Corrections to Requirements | Airbus DS SLC, Qualcomm Incorporated | imported from 3GU |
S1‑192795 | Adding UxNB related requirements | ZTE Corporation, China Unicom, ZTE Trunking Technology Corp | imported from 3GU |
S1‑192796 | 22.125 CR of KPIs for UAV services | China Unicom | imported from 3GU |
S1‑192797 | Service restriction requirements for UAV | CATT, China Unicom, Huawei, ZTE | imported from 3GU |
S1‑192798 | General description for UAV aspects | China Unicom | imported from 3GU |
S1‑192799 | Draft Reply LS to SA6 on UAS-related terminology and model | Qualcomm communications-France | imported from 3GU |
S1‑192800 | Minutes of the MUSIM drafting session | Samsung | imported from 3GU |
S1‑192801 | Clarification on MUSIM terminology | Qualcomm communications-France | imported from 3GU |
S1‑192802 | Merged potential service requirements: Non-public networks as private slices | CATT | imported from 3GU |
S1‑192803 | Clarifying the ‘Separate Devices’ requirement in MUSIM | Samsung R&D Institute UK | imported from 3GU |
S1‑192804 | Clarification on MUSIM terminology | Qualcomm communications-France | imported from 3GU |
S1‑192805 | Clarification on consolidate service requirements in clause 8.1 | Intel | imported from 3GU |
S1‑192806 | Power optimization requirement in MUSIM | China Telecommunications | imported from 3GU |
S1‑192807 | Clarification on consolidate service requirements in clause 8.2 | Intel, Huawei, Huawei Device, China Mobile, vivo mobile communications, Charter Communications Inc, LG Electronics | imported from 3GU |
S1‑192808 | Clarification on emergency service requirements in section 8.3 | Intel, Qualcomm, Volkswagen AG, CMCC, Huawei, Huawei Device, LG | imported from 3GU |
S1‑192809 | Service requirements for enabling Multi-USIM devices support | Intel | imported from 3GU |
S1‑192810 | Support for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192811 | Support of Emergency Services for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192812 | Reply LS to SA2 on network slice constraint requirement clarification | S1 | imported from 3GU |
S1‑192813 | LS to CT1 (cc RAN2) on enhanced access control for IMS signalling | Huawei | imported from 3GU |
S1‑192814 | Clarify requirements for bulk IoT operation and authentication | Qualcomm communications-France | imported from 3GU |
S1‑192815 | Clarify requirements for group IoT authentication | Qualcomm, Vodafone | imported from 3GU |
S1‑192816 | Reply LS to SA2, SA3 on authentication of group of IoT devices | SA1 | imported from 3GU |
S1‑192817 | LS to SA6 on UAS-related terminology and model | SA1 | imported from 3GU |
S1‑192818 | New WID on Asset Tracking for 5G (ATRAC) | NOVAMINT | imported from 3GU |
S1‑192819 | Status report of ATRAC | NOVAMINT | imported from 3GU |
S1‑192820 | Status report of MINT | LG | imported from 3GU |
S1‑192821 | FS_MINT: Consolidation of Potential Requirements for TR22.831 | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192822 | 22.261 - Asset Tracking Description and Requirements | NOVAMINT | imported from 3GU |
S1‑192823 | Revision of WID on service requirements on enhancements for cyber-physical control applications in vertical domains (eCAV) | Siemens | imported from 3GU |
S1‑192824 | Status Report on Enhanced Calling Name Analytics Interworking (eCNAM_An) | Ericsson | imported from 3GU |
S1‑192825 | Status Report on eCPSOR_CON | NTT DOCOMO | imported from 3GU |
S1‑192826 | Broadcast / multicast requirements supporting Mission Critical Services in 5G | BDBOS, FirstNet, The Police of the Netherlands, MINISTERE DE L'INTERIEUR, Home Office, KPN | imported from 3GU |
S1‑192827 | new SID - evolution of IMS multimedia telephony service (FS_MMTELin5G) | China Mobile | imported from 3GU |
S1‑192828 | Status report for FS_MMTELin5G | China Mobile | imported from 3GU |
S1‑192829 | Study on sharing administrative configuration between interconnected MCX systems (FS_SACI_MCS) | BDBOS | imported from 3GU |
S1‑192830 | Report on FS_SACI_MCS | BDBOS | imported from 3GU |
S1‑192831 | New WID on multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192832 | Status report for MuDE | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192833 | MuD user preferences | vvivo Mobile Communication Co. LTD, Orange | imported from 3GU |
S1‑192834 | Clarifications for KPIs on Low latency and high reliability scenarios | LG Electronics Deutschland | imported from 3GU |
S1‑192835 | Clarification for CSA requirements | Huawei, Siemens | imported from 3GU |
S1‑192836 | FS_REFEC – TR Consolidated Requirements | KPN | imported from 3GU |
S1‑192837 | Minutes of the MUSIM drafting session | Samsung | imported from 3GU |
S1‑192838 | Update of traffic scenario: Metering use case | KPN | imported from 3GU |
S1‑192839 | Update of traffic scenario: Containers | KPN | imported from 3GU |
S1‑192840 | Update of traffic scenario: Freight wagons | KPN | imported from 3GU |
S1‑192841 | New traffic scenario: Public Safety | KPN | imported from 3GU |
S1‑192842 | Traffic Scenario - consolidation | KPN | imported from 3GU |
S1‑192843 | FS_REFEC – TR Consolidated Requirements | KPN | imported from 3GU |
S1‑192844 | FS_MINT: Consolidation of Potential Requirements for TR22.831 | LG Electronics, Samsung, LG Uplus, KT Corp | imported from 3GU |
S1‑192845 | Introduction of Minimization of Service Interruption (MINT) | Samsung, LG Electronics | imported from 3GU |
S1‑192846 | FS_eCAV – TR 22.832 – Update Use Case Mobile Operation Panel | Siemens | imported from 3GU |
S1‑192847 | Way forward for NCIS | Rapporteur | imported from 3GU |
S1‑192848 | FS_eCAV multi-connectivity for robotic automation | Nokia, Nokia Shanghai Bell | imported from 3GU |
S1‑192849 | Non-public networks as private slices | CATT | imported from 3GU |
S1‑192850 | Gap analysis for Private call priority during internetworking with LMR | Hansung University | imported from 3GU |
S1‑192851 | Gap analysis for 9.14 Vertual Coupling | Hansung University | imported from 3GU |
S1‑192852 | FS_eCAV – merged potential service requirements – Industrial Ethernet integration | Siemens | imported from 3GU |
S1‑192853 | FS_eCAV – merged potential service requirements – Network performance | Siemens | imported from 3GU |
S1‑192854 | FS_eCAV – merged potential service requirements – ProSe Communication for CAV | Siemens | imported from 3GU |
S1‑192855 | New WID on broadcast / multicast requirements supporting Mission Critical Services in 5G (5MBS_eMC) | BDBOS | imported from 3GU |
S1‑192856 | Report on SACI_MCS | BDBOS | imported from 3GU |
S1‑192857 | Clarification of requirement 1 in section 8.2 | Rapporteur (Intel) | imported from 3GU |
S1‑192858 | Support for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192859 | Support of MUSIM UE | Rapporteur (Intel) | imported from 3GU |
S1‑192860 | New WID on multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192861 | CR to 22.125 service experience assurance requirements for UAV | China Unicom, ZTE, CATT | imported from 3GU |
S1‑192862 | Clarification on consolidate service requirements in clause 8.1 | Intel | imported from 3GU |
S1‑192863 | Clarification on consolidate service requirements in clause 8.2 | Intel, Huawei, Huawei Device, China Mobile, vivo mobile communications, Charter Communications Inc, LG Electronics | imported from 3GU |
S1‑192864 | Service requirements for enabling Multi-USIM devices support | Intel | imported from 3GU |
S1‑192865 | Support for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192866 | Support of Emergency Services for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192867 | eCAV – Service performance requirements for Industrial Wireless Sensors | Ericsson | imported from 3GU |
S1‑192868 | eCAV – further 5G service requirements for wired to wireless link replacement for smart manufacturing / Industry 4.0 | Siemens AG | imported from 3GU |
S1‑192869 | eCAV – further 5G service requirements for industrial Ethernet integration (clock synchronization, time-sensitive communication) | Siemens | imported from 3GU |
S1‑192870 | eCAV – further 5G service requirements for network performance | Siemens | imported from 3GU |
S1‑192871 | eCAV – further 5G service requirements for ProSe communication for CAV | Siemens | imported from 3GU |
S1‑192872 | eCAV – further 5G service requirements for network operation and management | Siemens, Huawei Technologies | imported from 3GU |
S1‑192873 | KPIs for Asset Tracking in 5G system | NOVAMINT | imported from 3GU |
S1‑192874 | Revision of WID on service requirements on enhancements for cyber-physical control applications in vertical domains (eCAV) | Siemens | imported from 3GU |
S1‑192875 | Broadcast / multicast requirements supporting Mission Critical Services in 5G | BDBOS, FirstNet, The Police of the Netherlands, MINISTERE DE L'INTERIEUR, Home Office, KPN | imported from 3GU |
S1‑192876 | New WID on multi-device and multi-identity enhancements (MuDE) | vivo Mobile Communication Co. LTD | imported from 3GU |
S1‑192877 | MuD user preferences | vvivo Mobile Communication Co. LTD, Orange | imported from 3GU |
S1‑192878 | Status Report for MuDE | vvivo Mobile Communication (Rapporteur) | imported from 3GU |
S1‑192879 | New study on Supporting of Railway Smart Station Services (FS_RAILSS) | Hansung University | imported from 3GU |
S1‑192880 | Cover page for presentation of TR 22.826v1.1.0 | Rapporteur (b<>com) | imported from 3GU |
S1‑192881 | Cover page for TR 22.831 on FS_CMED | b<>com | imported from 3GU |
S1‑192882 | Support for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192883 | Service requirements for enabling Multi-USIM devices support | Intel | imported from 3GU |
S1‑192884 | Cover page for presentation of TR22.831v0.2.0 | Rapporteur (LG Electronics) | imported from 3GU |
S1‑192885 | Support of Emergency Services for Multi-USIM Devices | Intel | imported from 3GU |
S1‑192886 | TS22.263v0.1.0 to include agreements at this meeting | Rapporteur (EBU) | imported from 3GU |
S1‑192887 | Status Report on FS_RAILSS | Rapporteur | imported from 3GU |
page generated from database: 2024-04-22 07:58:53