3GPP TDocs (written contributions) at meeting
Meeting: R4-63 - 2012-05-21 to 2012-05-25, Prague
meeting id: R4-63 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑122230 | Meeting Agenda | WG Chairman | imported from 3GU |
R4‑122231 | RAN4#62Bis Meeting Report | ETSI Secretariat | imported from 3GU |
R4‑122232 | CA_B5-B12: Core requirements text proposal | US Cellular | imported from 3GU |
R4‑122233 | Validation of 3GPP SCME channel models emulated in mode-stirred reverberation chambers | CTTC, EMITE, XLIM | imported from 3GU |
R4‑122234 | Use of NIST channel model in mode-stirred reverberation chamber for emulation of realistic fading scenarios | CTTC, EMITE, UPCT | imported from 3GU |
R4‑122235 | Applicability of EMC requirements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R4‑122236 | Applicability of EMC requirements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R4‑122237 | Applicability of EMC requirements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R4‑122238 | Measured REFSENS values for LTE in B3, B7 and B20 | TeliaSonera AB | imported from 3GU |
R4‑122239 | TP for TR ab.cde (inter-band CA): deltaRIB for CA_3-7 | TeliaSonera AB | imported from 3GU |
R4‑122240 | TP for TR ab.cde (inter-band CA) | TeliaSonera AB | imported from 3GU |
R4‑122241 | Technical Report 36.831 V0.2.0 for LTE_CA_B7 | Rapporteur | imported from 3GU |
R4‑122242 | Way forward of LTE_CA_B7 | China Unicom, China Telecom | imported from 3GU |
R4‑122243 | IL proposal for inter-band CA B1 + B7 | China Telecom | imported from 3GU |
R4‑122244 | TP for TR ab.cde (inter-band CA) on IMD study of B1 + B7 CA | China Telecom | imported from 3GU |
R4‑122245 | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | Rohde & Schwarz | imported from 3GU |
R4‑122246 | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | Rohde & Schwarz | imported from 3GU |
R4‑122247 | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | Rohde & Schwarz | imported from 3GU |
R4‑122248 | RRM: Correction of sr-ConfigIndex for TDD TC-s with configured scheduling request | Rohde & Schwarz | imported from 3GU |
R4‑122249 | TR approach for Rel-11 LTE CA related WIs | WG Chairman | imported from 3GU |
R4‑122250 | sr-ConfigIndex in TDD DRX test cases | Anritsu | imported from 3GU |
R4‑122251 | sr-ConfigIndex in TDD DRX test cases | Anritsu | imported from 3GU |
R4‑122252 | sr-ConfigIndex in TDD DRX test cases | Anritsu | imported from 3GU |
R4‑122253 | sr-ConfigIndex in TDD DRX test cases | Anritsu | imported from 3GU |
R4‑122254 | Remove [ ] from eICIC RSRP, RSRQ Es/Iot side conditions | Anritsu | imported from 3GU |
R4‑122255 | Remove [ ] from eICIC RSRP, RSRQ Es/Iot side conditions | Anritsu | imported from 3GU |
R4‑122256 | Calculation method for Es/Iot, RSRQ, Io in eICIC RSRP, RSRQ TCs | Anritsu | imported from 3GU |
R4‑122257 | Definition of Interfering cell for eICIC demod+RRM Test cases | Anritsu | imported from 3GU |
R4‑122258 | SNR definition | Anritsu | imported from 3GU |
R4‑122259 | Correction on ACLR procedure and test requirement | Nokia Siemens Networks | imported from 3GU |
R4‑122260 | Correction on ACLR procedure and test requirement | Nokia Siemens Networks | imported from 3GU |
R4‑122261 | Transmitter intermodulation applicability clarification for single-RAT specifications | Nokia Siemens Networks | imported from 3GU |
R4‑122262 | Transmitter intermodulation applicability clarification for single-RAT specifications | Nokia Siemens Networks | imported from 3GU |
R4‑122263 | Transmitter intermodulation applicability clarification for single-RAT specifications | Nokia Siemens Networks | imported from 3GU |
R4‑122264 | Introduction of time alignment error requirement for intra-band non-contiguous carrier aggregation | Nokia Siemens Networks | imported from 3GU |
R4‑122265 | Introduction of time alignment error requirement for intra-band non-contiguous carrier aggregation | Nokia Siemens Networks | imported from 3GU |
R4‑122266 | Proposal for MSR LA blocking requirement | Nokia Siemens Networks, Ericsson | imported from 3GU |
R4‑122267 | Proposal for MSR LA intermodulation requirement | Nokia Siemens Networks, Ericsson | imported from 3GU |
R4‑122268 | 3GPP TR 36.823 v0.0.3 | Nokia Siemens Networks | imported from 3GU |
R4‑122269 | SAR testing information | InterDigital | imported from 3GU |
R4‑122270 | P-MPR for HSPA | InterDigital | imported from 3GU |
R4‑122271 | RRC supervision timer for UTRA TDD SI acquisition | CATT | imported from 3GU |
R4‑122272 | Introduction of APAC700(FDD) into TS 36.104 | NTT DOCOMO, Ericsson, ST-Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑122273 | Introduction of APAC700(FDD) into TS 36.141 | NTT DOCOMO, Ericsson, ST-Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑122274 | Further response LS on RRC supervision timer for UMTS SI acquisition | CATT | imported from 3GU |
R4‑122275 | Introduction of APAC700(FDD) into TS 37.104 | NTT DOCOMO, Ericsson, ST-Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑122276 | Introduction of APAC700(FDD) into TS 37.141 | NTT DOCOMO, Ericsson, ST-Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑122277 | Discussion on interruption for SCell state transition | CATT | imported from 3GU |
R4‑122278 | Discussion on NCT measurement performance | CATT | imported from 3GU |
R4‑122279 | LS response on the RS for additional carrier types for carrier aggregation enhancement | CATT | imported from 3GU |
R4‑122280 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | imported from 3GU |
R4‑122281 | Some corrections to TS 36.104 (Rel-10) | ZTE | imported from 3GU |
R4‑122282 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | imported from 3GU |
R4‑122283 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | imported from 3GU |
R4‑122284 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | imported from 3GU |
R4‑122285 | Some corrections to TS 36.104 (Rel-11) | ZTE | imported from 3GU |
R4‑122286 | Some corrections to TS 36.141 (Rel-10) | ZTE | imported from 3GU |
R4‑122287 | Simulation results for eICIC PDSCH TM3 demodulation requirement under Non-MBSFN ABS | Fujitsu | imported from 3GU |
R4‑122288 | Some corrections to TS 36.141 (Rel-11) | ZTE | imported from 3GU |
R4‑122289 | Simulation results for eICIC PDSCH TM2 demodulation requirement under Non-MBSFN ABS | Fujitsu | imported from 3GU |
R4‑122290 | TP of backhaul link Transmitter Spurious Emission in TR 36.826 | ZTE, CMCC | imported from 3GU |
R4‑122291 | Simulation results for eICIC PDCCH/PHICH demodulation requirements under Non-MBSFN ABS | Fujitsu | imported from 3GU |
R4‑122292 | Clarification on multiple timing advance group for intra band non-contiguous carrier aggregation | ZTE | imported from 3GU |
R4‑122293 | Simulation results for eICIC CQI reporting test | Fujitsu | imported from 3GU |
R4‑122294 | TP on output power requirement for E-UTRA MR BS | ZTE | imported from 3GU |
R4‑122295 | TP on UEM requirement for MSR MR BS | ZTE | imported from 3GU |
R4‑122296 | Simulation results for eICIC PDSCH demodulation requirement under MBSFN ABS | Fujitsu | imported from 3GU |
R4‑122297 | Updated REFSENS results for E-UTRA Medium Range BS | ZTE | imported from 3GU |
R4‑122298 | TP of medium range BS reference sensitivity | ZTE | imported from 3GU |
R4‑122299 | Simulation results for eDL MIMO CQI requirements | Fujitsu | imported from 3GU |
R4‑122300 | TP on Reference sensitivity requirement for MSR MR BS | ZTE | imported from 3GU |
R4‑122301 | Simulation results for eDL MIMO PMI requirements | Fujitsu | imported from 3GU |
R4‑122302 | TP for LA MSR BS Operating band unwanted emission mask | ZTE | imported from 3GU |
R4‑122303 | Simulation results for eDL MIMO RI requirements | Fujitsu | imported from 3GU |
R4‑122304 | TP on Regional requirements for MB-MSR (TR Clause 4.3) | ZTE | imported from 3GU |
R4‑122305 | Simulation results for CA soft buffer limitation in FDD | Fujitsu | imported from 3GU |
R4‑122306 | TP on Definitions and terminology for MB MSR BS (TR Clause 5.1) | ZTE | imported from 3GU |
R4‑122307 | TP on operating bands and Band categories for MB-MSR (TR Clause 5.3) | ZTE | imported from 3GU |
R4‑122308 | Simulation results for CA soft buffer limitation in TDD | Fujitsu | imported from 3GU |
R4‑122309 | TP on TX Characteristics General Part for MB MSR BS (TR Clause 6.1) | ZTE | imported from 3GU |
R4‑122310 | TP on Base station output power (TR Clause 6.2) | ZTE | imported from 3GU |
R4‑122311 | Simulation results for CA power imbalance requirement | Fujitsu | imported from 3GU |
R4‑122312 | TP on Output power dynamics (TR Clause 6.3) | ZTE | imported from 3GU |
R4‑122313 | TP on Transmit ON/OFF power (TR Clause 6.4) | ZTE | imported from 3GU |
R4‑122314 | TP on Transmitted signal quality (TR Clause 6.5) | ZTE | imported from 3GU |
R4‑122315 | TP on Transmitter spurious emissions (TR Clause 6.6.1) | ZTE | imported from 3GU |
R4‑122316 | TP on Operating band unwanted emissions (TR Clause 6.6.2) | ZTE | imported from 3GU |
R4‑122317 | TP on Occupied bandwidth (TR Clause 6.6.3) | ZTE | imported from 3GU |
R4‑122318 | TP on Adjacent Channel Leakage power Ratio (ACLR) (TR Clause 6.6.4) | ZTE | imported from 3GU |
R4‑122319 | TP on Transmitter intermodulation (TR Clause 6.7) | ZTE | imported from 3GU |
R4‑122320 | TP on General for for MB-MSR (TR Clause 7.1) | ZTE | imported from 3GU |
R4‑122321 | TP on Reference sensitivity for MB-MSR (TR Clause 7.2) | ZTE | imported from 3GU |
R4‑122322 | TP on Dynamic Range for MB-MSR (TR Clause 7.3) | ZTE | imported from 3GU |
R4‑122323 | TP on In-band selectivity and blocking for MB-MSR (TR Clause 7.4) | ZTE | imported from 3GU |
R4‑122324 | TP on Out-of-band blocking for MB-MSR (TR Clause 7.5) | ZTE | imported from 3GU |
R4‑122325 | TP on Receiver spurious emission for MB-MSR (TR Clause 7.6) | ZTE | imported from 3GU |
R4‑122326 | TP on Receiver intermodulationfor MB-MSR (TR Clause 7.7) | ZTE | imported from 3GU |
R4‑122327 | TP on In-channel selectivity for MB-MSR (TR Clause 7.8) | ZTE | imported from 3GU |
R4‑122328 | Way Forward on new BS performance requirements for HSPA CLTD | Ericsson, ST-Ericsson, Nokia-Siemens Networks, Huawei | imported from 3GU |
R4‑122329 | UL CLTD: Impact of Time Alignment Error on BS performance | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122330 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | imported from 3GU |
R4‑122331 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | imported from 3GU |
R4‑122332 | Deterministic results on Coexistence of TDD with different UL/DL configurations for Macro-Macro co-channel scenario | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122333 | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | imported from 3GU |
R4‑122334 | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | imported from 3GU |
R4‑122335 | Link simulation results for CSI-RS RSRP measurement feasibility study | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122336 | System simulation results for CSI-RS RSRP measurement feasibility study | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122337 | Introduction of CA_1A-19A to TS 36.307 | NTT DOCOMO | imported from 3GU |
R4‑122338 | LME and LEE clarification to measurements of radio performance for terminals on uncertainty contributions in measurements | ZTE | imported from 3GU |
R4‑122339 | Introduction of CA_1A-19A to TS 36.307 | NTT DOCOMO | imported from 3GU |
R4‑122340 | Clarification to TRP and TRS Requirements for LME and LEE UMTS Bands | ZTE | imported from 3GU |
R4‑122341 | Clarification to TRS Requirements for Roaming Bands | ZTE | imported from 3GU |
R4‑122342 | Clarification to TRS Requirements for Roaming Bands | ZTE | imported from 3GU |
R4‑122343 | Draft reply LS on CSI-RS based measurement for CoMP | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122344 | Frequency Band Requirements for UMTS Band XIX | ZTE | imported from 3GU |
R4‑122345 | Frequency Band Requirements for UMTS Band XIX | ZTE | imported from 3GU |
R4‑122346 | Text proposal: Feasibility study on further enhancements to LTE TDD for DL-UL interference | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122347 | Assumptions for B14 HPUE coexistence study | Motorola Solutions | imported from 3GU |
R4‑122348 | B14 PSBB HPUE UL to B13 eNodeB co-existence results | Motorola Solutions | imported from 3GU |
R4‑122349 | TR36.837: TP for subclause 5.4.1 | Motorola Solutions | imported from 3GU |
R4‑122350 | TR37.837: TP for subclause 5.4.2 | Motorola Solutions | imported from 3GU |
R4‑122351 | TR36.837: TP for subclause 6.6.2 | Motorola Solutions | imported from 3GU |
R4‑122352 | Band 13 NS_07 requirements | Motorola Solutions | imported from 3GU |
R4‑122353 | TR36.807 wayforward | Motorola Solutions | imported from 3GU |
R4‑122354 | PIM comparison of CW-carriers and modulated carriers | Kathrein | imported from 3GU |
R4‑122355 | Extension of the new antenna model to a 2D antenna array | Kathrein | imported from 3GU |
R4‑122356 | RFPM Inclusion in E-UTRAN TR 36.809 v0.2.0 | Polaris Wireless | imported from 3GU |
R4‑122357 | RFPM Modeling Error | Polaris Wireless | imported from 3GU |
R4‑122358 | TP for TR 36.809: Scope and Description | Polaris Wireless | imported from 3GU |
R4‑122359 | RFPM Simulation Results with Inter-RAT Measurements | Polaris Wireless | imported from 3GU |
R4‑122360 | TP for TR 36.809: Architecture | Polaris Wireless | imported from 3GU |
R4‑122361 | TP for TR 36.809: Simulation Methodology | Polaris Wireless | imported from 3GU |
R4‑122362 | TP for TR 36.809: Polaris Wireless Simulation Results | Polaris Wireless | imported from 3GU |
R4‑122363 | TP for TR 36.809: Impact to the E-UTRA Specifications | Polaris Wireless | imported from 3GU |
R4‑122364 | TP for TR 36.809: Conclusions | Polaris Wireless | imported from 3GU |
R4‑122365 | When Retuning Interruptions for SCell Activation/Deactivation are Applied | InterDigital | imported from 3GU |
R4‑122366 | Further simulation results and discussion for CA power imbalance tests | Motorola Mobility | imported from 3GU |
R4‑122367 | Correction on idle state RSRP filter requirement on inter-RAT measurement from UTRAN to E-UTRAN | Research In Motion UK Limited | imported from 3GU |
R4‑122368 | Correction on idle state RSRP filter requirement on inter-RAT measurement from UTRAN to E-UTRAN | Research In Motion UK Limited | imported from 3GU |
R4‑122369 | LTE Advanced intra-band non-contiguous Carrier Aggregation for Band 4 | T-Mobile USA | imported from 3GU |
R4‑122370 | UTDOA Work Plan | TruePosition | imported from 3GU |
R4‑122371 | Correction on idle state RSRP filter requirement on inter-RAT measurement from UTRAN to E-UTRAN | Research In Motion UK Limited | imported from 3GU |
R4‑122372 | Correction on idle state RSRP filter requirement on inter-RAT measurement from UTRAN to E-UTRAN | Research In Motion UK Limited | imported from 3GU |
R4‑122373 | Draft LS Response to Physical Layer Measurement for network positioning | TruePosition | imported from 3GU |
R4‑122374 | LTE Advanced inter-band Carrier Aggregation for Band 2 and Band 4 | T-Mobile USA | imported from 3GU |
R4‑122375 | Correction to higher priority search requirements | Research In Motion UK Limited | imported from 3GU |
R4‑122376 | Correction to higher priority search requirements | Research In Motion UK Limited | imported from 3GU |
R4‑122377 | Proposal for E-UTRA Medium-Range and MSR Receiver Intermodulation Requirement | Nokia Siemens Networks, Ericsson | imported from 3GU |
R4‑122378 | Antenna tilt angle considerations | Nokia Siemens Networks | imported from 3GU |
R4‑122379 | Spatial aspects of passive antenna arrays | Nokia Siemens Networks | imported from 3GU |
R4‑122380 | AAS study item goals and outputs | Nokia Siemens Networks | imported from 3GU |
R4‑122381 | TP for PIM TR: section 6, PIM generation from site infra-structure | Nokia Siemens Networks | imported from 3GU |
R4‑122382 | TP for PIM TR: section 7, PIM impact on receiver performance | Nokia Siemens Networks | imported from 3GU |
R4‑122383 | for PIM TR: section 8, deployment aspects and counter measures for PIM | Nokia Siemens Networks | imported from 3GU |
R4‑122384 | TP for PIM TR: section 10, Testing aspects | Nokia Siemens Networks | imported from 3GU |
R4‑122385 | Simulation results for CSI-RS based RSRP measurement accuracy | Samsung | imported from 3GU |
R4‑122386 | System simulation results for CSI-RS based RSRP measurement feasibility | Samsung | imported from 3GU |
R4‑122387 | Updated link level simulation results for enhanced receiver study | NEC | imported from 3GU |
R4‑122388 | Impact of interference modulation on link level performance with advanced receiver | NEC | imported from 3GU |
R4‑122389 | Simulation Results for UE Cat UE 3 and Cat 4 soft buffer test | NEC | imported from 3GU |
R4‑122390 | Considerations on eDL-MIMO PMI tests | Samsung | imported from 3GU |
R4‑122391 | Simulation results for CQI FDD and TDD reporting tests under fading conditions | NEC | imported from 3GU |
R4‑122392 | Simulation results for PMI random precoding granularity | NEC | imported from 3GU |
R4‑122393 | Simulation results and requirements proposal for RI reporting tests | NEC | imported from 3GU |
R4‑122394 | Simulation Results on eICIC ABS Demodulation Performance | NEC | imported from 3GU |
R4‑122395 | Discussion on modeling AAS antenna pattern | ZTE | imported from 3GU |
R4‑122396 | Simulation results and requirement proposal for power imbalance test | NEC | imported from 3GU |
R4‑122397 | Text proposal for simulation assumptions for AAS | ZTE | imported from 3GU |
R4‑122398 | Discussion for ACLR requirements | ZTE | imported from 3GU |
R4‑122399 | Discussion for blocking requirements | ZTE | imported from 3GU |
R4‑122400 | Discussion for antenna requirements in AAS BS | ZTE | imported from 3GU |
R4‑122401 | Discussion on Inter-Band CA RF front-end Architecture | KT | imported from 3GU |
R4‑122402 | Text proposal for comparison of different test methods for AAS | ZTE, Nokia Siemens Networks | imported from 3GU |
R4‑122403 | MOSG Reference Antennas – Preliminary Results | Bluetest AB | imported from 3GU |
R4‑122404 | Protection of DTV in 694-698MHz for APAC700 | KT | imported from 3GU |
R4‑122405 | Editorial correction to ACS for CA | CATR | imported from 3GU |
R4‑122406 | UE Rx signal level statistics for FeICIC | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑122407 | CSI-RS based measurement for CoMP | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑122408 | Introduction of Requirements for Multiple Timing Advances for Carrier Aggregation | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑122409 | Considerations on the scenario feasibility | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑122410 | Deterministic evaluation for Macro-Macro co-channel scenario with different UL/DL configuration | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑122411 | Clarification of uplink power control in TR36.942 | Huawei | imported from 3GU |
R4‑122412 | UL power control for E-UTRA MR BS | Huawei, CATT | imported from 3GU |
R4‑122413 | TP on Output power for MR BS | Huawei | imported from 3GU |
R4‑122414 | Information on band usage in 2.5GHz band in Japan | ARIB | imported from 3GU |
R4‑122415 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R8) | SOFTBANK MOBILE | imported from 3GU |
R4‑122416 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R9) | SOFTBANK MOBILE | imported from 3GU |
R4‑122417 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R8) | SOFTBANK MOBILE | imported from 3GU |
R4‑122418 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R11) | SOFTBANK MOBILE | imported from 3GU |
R4‑122419 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R8) | SOFTBANK MOBILE | imported from 3GU |
R4‑122420 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R9) | SOFTBANK MOBILE | imported from 3GU |
R4‑122421 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R10) | SOFTBANK MOBILE | imported from 3GU |
R4‑122422 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R11) | SOFTBANK MOBILE | imported from 3GU |
R4‑122423 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R8) | SOFTBANK MOBILE | imported from 3GU |
R4‑122424 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R9) | SOFTBANK MOBILE | imported from 3GU |
R4‑122425 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R10) | SOFTBANK MOBILE | imported from 3GU |
R4‑122426 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R11) | SOFTBANK MOBILE | imported from 3GU |
R4‑122427 | Removing brackets of contiguous allocation A-MPR for CA_NS_04 | Clearwire | imported from 3GU |
R4‑122428 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R9) | SOFTBANK MOBILE | imported from 3GU |
R4‑122429 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R9) | SOFTBANK MOBILE | imported from 3GU |
R4‑122430 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R10) | SOFTBANK MOBILE | imported from 3GU |
R4‑122431 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R11) | SOFTBANK MOBILE | imported from 3GU |
R4‑122432 | Backdating CA_41C to Rel-10 | Clearwire | imported from 3GU |
R4‑122433 | TP on Tx spurious emission for E-UTRA&MSR MR BS | Huawei | imported from 3GU |
R4‑122434 | TP on Reference sensitivity for E-UTRA MR BS | Huawei | imported from 3GU |
R4‑122435 | TP on Receiver dynamic range for E-UTRA MR BS | Huawei | imported from 3GU |
R4‑122436 | TP on ACS and narrowband blocking for E-UTRA MR BS | Huawei | imported from 3GU |
R4‑122437 | Simulation results for CA power imbalance | Qualcomm Incorporated | imported from 3GU |
R4‑122438 | TP on in-band blocking for E-UTRA MR BS | Huawei | imported from 3GU |
R4‑122439 | Further consideration on static CQI test case for eICIC | Qualcomm Incorporated | imported from 3GU |
R4‑122440 | Alignment results for eICIC demodulation requirements | Qualcomm Incorporated | imported from 3GU |
R4‑122441 | TP on in-channel selectivity for E-UTRA MR BS | Huawei | imported from 3GU |
R4‑122442 | Further considerations on RI test case for non-MBSFN ABS | Qualcomm Incorporated | imported from 3GU |
R4‑122443 | TP on Rx intermodulation for E-UTRA MR BS | Huawei | imported from 3GU |
R4‑122444 | On modeling interference in ABS and non-ABS subframes | Qualcomm Incorporated | imported from 3GU |
R4‑122445 | Test for CA PDSCH with power imbalance | Huawei,HiSilicon | imported from 3GU |
R4‑122446 | TP on Reference sensitivity for MSR MR BS | Huawei | imported from 3GU |
R4‑122447 | Test for CA PDSCH with power imbalance | Huawei,HiSilicon | imported from 3GU |
R4‑122448 | TP on in-band blocking for MSR MR BS | Huawei | imported from 3GU |
R4‑122449 | Further system level simulations for FeICIC with 9 dB cell range expansion | Qualcomm Incorporated | imported from 3GU |
R4‑122450 | TP on output power for MSR LA BS | Huawei | imported from 3GU |
R4‑122451 | Discussion on CA CSI test | Huawei,HiSilicon | imported from 3GU |
R4‑122452 | Discussion and simulation results for soft buffer limitation test | Huawei,HiSilicon | imported from 3GU |
R4‑122453 | TP on UEM for MSR LA BS | Huawei | imported from 3GU |
R4‑122454 | Discussion on Rx requirements for MSR LA BS | Huawei | imported from 3GU |
R4‑122455 | Requirements with DTX detection for CQI format2 | Huawei | imported from 3GU |
R4‑122456 | TP on Rx intermodulation for MSR LA BS | Huawei | imported from 3GU |
R4‑122457 | TP on in-band blocking for MSR LA BS | Huawei | imported from 3GU |
R4‑122458 | Discussion on the reduced RS bandwidth for the additional carrier types | Huawei,HiSilicon | imported from 3GU |
R4‑122459 | TP on out of band blocking for MSR LA BS | Huawei | imported from 3GU |
R4‑122460 | Response to LS on the reduced CRS for additional carrier types | Huawei,HiSilicon | imported from 3GU |
R4‑122461 | Simulation assumptions for asynchronous network operation | Qualcomm Incorporated | imported from 3GU |
R4‑122462 | 36.826 TP: OCNG pattern for R-PDCCH demodulation performance requirements | Huawei | imported from 3GU |
R4‑122463 | Conformance test for Relay | Huawei | imported from 3GU |
R4‑122464 | Introduction of RI test for eICIC for non-MBSFN configuration | Qualcomm Incorporated | imported from 3GU |
R4‑122465 | Extension of static eICIC CQI test | Qualcomm Incorporated | imported from 3GU |
R4‑122466 | Discussion on SNR requirements for demodulation test cases | Huawei,HiSilicon | imported from 3GU |
R4‑122467 | On CQI definition test | Huawei,HiSilicon | imported from 3GU |
R4‑122468 | Introduction of eICIC demodulation requirements for non-MBSFN configuration | Qualcomm Incorporated | imported from 3GU |
R4‑122469 | On MBSFN-ABS demodulation tests | Huawei,HiSilicon | imported from 3GU |
R4‑122470 | Introduction of PDCCH test with colliding RS on MBSFN-ABS | Huawei,HiSilicon | imported from 3GU |
R4‑122471 | Introduction of PDCCH test with colliding RS on MBSFN-ABS | Huawei,HiSilicon | imported from 3GU |
R4‑122472 | CR on CQI definition test | Huawei,HiSilicon | imported from 3GU |
R4‑122473 | Lower limit of DTV protection for APAC700 (FDD) | NTT DOCOMO, Panasonic, eAccess, KDDI, NEC, Sharp, Fujitsu | imported from 3GU |
R4‑122474 | CR on CQI definition test | Huawei,HiSilicon | imported from 3GU |
R4‑122475 | CR on CQI definition test | Huawei,HiSilicon | imported from 3GU |
R4‑122476 | Some clarifications and OCNG pattern for eICIC demodulation requirements | Huawei,HiSilicon | imported from 3GU |
R4‑122477 | Some clarifications and OCNG pattern for eICIC demodulation requirements | Huawei,HiSilicon | imported from 3GU |
R4‑122478 | Suggested parameters for FeICIC testing under 9dB bias | Huawei,HiSilicon | imported from 3GU |
R4‑122479 | Discussion on the reference receiver for FeICIC | Huawei,HiSilicon | imported from 3GU |
R4‑122480 | TP for BS PIM scenarios | Huawei | imported from 3GU |
R4‑122481 | Introduction of OLTD into 25.101 | Huawei, HiSilicon, Magnolia Broadband | imported from 3GU |
R4‑122482 | Results for LTE TDD eIMTA stage 3: macro-macro co-channels scenario | ZTE | imported from 3GU |
R4‑122483 | Results for LTE TDD eIMTA stage 3: macro-macro co-channels scenario | ZTE | imported from 3GU |
R4‑122484 | Considerations on RSRQ measurement bandwidth | Samsung | imported from 3GU |
R4‑122485 | Time alignment error requirement | Huawei, HiSilicon | imported from 3GU |
R4‑122486 | Open issues on CLTD core requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122487 | TP for MB-MSR WI objective | Huawei | imported from 3GU |
R4‑122488 | TP for MB-MSR application scenarios | Huawei | imported from 3GU |
R4‑122489 | Additional IL from combining the band 5 and band 12 for CA | Samsung | imported from 3GU |
R4‑122490 | Consideration on definitions and terminology for MB-MSR | Huawei | imported from 3GU |
R4‑122491 | Updated results for TDD CA Soft Buffer Limitation | CATT | imported from 3GU |
R4‑122492 | TP on definitions, symbols and abbreviations for MB-MSR | Huawei | imported from 3GU |
R4‑122493 | Introduction of TDD CA Soft Buffer Limitation | CATT | imported from 3GU |
R4‑122494 | Simulation results for PUCCH format 2 DTX detection function | Samsung | imported from 3GU |
R4‑122495 | Introduction of TDD CA Soft Buffer Limitation | CATT | imported from 3GU |
R4‑122496 | Achievable OOBE emission level at 692-698MHz by UE | Samsung | imported from 3GU |
R4‑122497 | Discussion on SAW filter to meet -26.2dBm/6MHz below 694MHz | Samsung | imported from 3GU |
R4‑122498 | TDD RI simulation results for eDLMIMO | CATT | imported from 3GU |
R4‑122499 | Simulation results for TDD Frequency selective CQI test | CATT | imported from 3GU |
R4‑122500 | Inter-band Carrier Aggregation TR v0.3.0 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122501 | Applicability of E-UTRA UE additional coexistence requirement | CATT | imported from 3GU |
R4‑122502 | Further consideration on how to specify requirements for MB-MSR | Huawei | imported from 3GU |
R4‑122503 | TP on operating bands and band category | Huawei | imported from 3GU |
R4‑122504 | TP for TRab.cde (LTE TRP TRS) General updating from existing standards | CATR | imported from 3GU |
R4‑122505 | Consideration on spurious emissions requirement for MB-MSR | Huawei | imported from 3GU |
R4‑122506 | TP of small correction for TRab.cde (LTE TRP TRS) | CATR | imported from 3GU |
R4‑122507 | TP on output power for MB-MSR BS | Huawei | imported from 3GU |
R4‑122508 | Coexistence study for LTE 900MHz | LG Electronics | imported from 3GU |
R4‑122509 | TP on output power dynamics for MB-MSR BS | Huawei | imported from 3GU |
R4‑122510 | TP on transmitted signal quality for MB-MSR BS | Huawei | imported from 3GU |
R4‑122511 | TP on operating band unwanted emissions for MB-MSR BS | Huawei | imported from 3GU |
R4‑122512 | TP on ACLR for MB-MSR BS | Huawei | imported from 3GU |
R4‑122513 | TP on transmitter intermodulation for MB-MSR BS | Huawei | imported from 3GU |
R4‑122514 | TP on reference sensitivity level for MB-MSR BS | Huawei | imported from 3GU |
R4‑122515 | TP on dynamic range for MB-MSR BS | Huawei | imported from 3GU |
R4‑122516 | TP on in-band selectivity and blocking for MB-MSR BS | Huawei | imported from 3GU |
R4‑122517 | TP on out-of-band blocking for MB-MSR BS | Huawei | imported from 3GU |
R4‑122518 | TP on receiver spurious emission for MB-MSR BS | Huawei | imported from 3GU |
R4‑122519 | The coexistence between APAC700 (TDD) and DTV | ZTE | imported from 3GU |
R4‑122520 | TP on receiver intermodulation for MB-MSR BS | Huawei | imported from 3GU |
R4‑122521 | TP on in-channel selectivity for MB-MSR BS | Huawei | imported from 3GU |
R4‑122522 | ACLR for non-contiguous CA | ZTE | imported from 3GU |
R4‑122523 | B26 and other editorial corrections | Motorola Solutions | imported from 3GU |
R4‑122524 | Comprehensive solution for the issue of RSRQ measurement BW | NTT DOCOMO | imported from 3GU |
R4‑122525 | TR 37.840 ver 0.2.0 | Huawei | imported from 3GU |
R4‑122526 | Corrections on TR 37.840 ver 0.2.0 | Huawei | imported from 3GU |
R4‑122527 | Encouragement of allowedMeasBandwidth utilization | NTT DOCOMO | imported from 3GU |
R4‑122528 | Encouragement of allowedMeasBandwidth utilization | NTT DOCOMO | imported from 3GU |
R4‑122529 | Minimum coupling loss of AAS | Huawei | imported from 3GU |
R4‑122530 | TP on simulation assumptions for AAS studying | Huawei | imported from 3GU |
R4‑122531 | On AAS antenna modelling | Huawei | imported from 3GU |
R4‑122532 | eICIC FDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | imported from 3GU |
R4‑122533 | Simulation results of in-band blocking for AAS receiver | Huawei | imported from 3GU |
R4‑122534 | Modeling of AAS transmitters spatail characteristics | Huawei | imported from 3GU |
R4‑122535 | Simulation results for soft buffer limit test cases in FDD | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122536 | On the RF requirements for AAS receiver | Huawei | imported from 3GU |
R4‑122537 | Simulation results for soft buffer limit test cases in TDD | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122538 | Lab results of the AAS transmitter spatial characteristics | Huawei | imported from 3GU |
R4‑122539 | Discussion and simulation results for power imbalance scenarios under CA | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122540 | Consideration on CSI requirement under CA deployment | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122541 | Considerations on combinations of intra-band CA and MIMO | ITRI | imported from 3GU |
R4‑122542 | Simulation Results and some Considerations on RSRQ Measurement Bandwidth | ZTE | imported from 3GU |
R4‑122543 | On spatial ACLR of AAS | Huawei | imported from 3GU |
R4‑122544 | Simulation Results and some Considerations on RSRQ Measurement Bandwidth | ZTE | imported from 3GU |
R4‑122545 | Link level results for baseline simulation assumptions with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122546 | Update to regional requirement table | CATT | imported from 3GU |
R4‑122547 | eICIC FDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | imported from 3GU |
R4‑122548 | Consideration on number of interfering cells with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122549 | Updated simulation results for advanced receiver | LG Electronics | imported from 3GU |
R4‑122550 | Update to regional requirement table | CATT | imported from 3GU |
R4‑122551 | Considerations on combinations of inter-band CA and MIMO | ITRI | imported from 3GU |
R4‑122552 | Considerations on combinations of inter-band CA and MIMO | ITRI | imported from 3GU |
R4‑122553 | Consideration on requirement setup in SNR/SINR with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122554 | eICIC TDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | imported from 3GU |
R4‑122555 | Consideration on the UE velocity for the channel model with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122556 | TP for TR 37.804 Study of E-UTRA specific issues | KT | imported from 3GU |
R4‑122557 | eICIC TDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | imported from 3GU |
R4‑122558 | TP for TR 37.804 Study of E-UTRA specific issues | KT | imported from 3GU |
R4‑122559 | Simulation results of advanced receiver in asynchronous network | LG Electronics | imported from 3GU |
R4‑122560 | On UE behavior in the uplink subframe after measurement GAP | CATT, Ericsson, ST-Ericsson | imported from 3GU |
R4‑122561 | Consideration on MCS setup for the serving cell with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122562 | Modification on BS requirement for NC CA | CATT | imported from 3GU |
R4‑122563 | Consideration on CSI requirement with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122564 | Testing of inter-frequency/ RAT measurement with gaps for CA capable UEs | NTT DOCOMO | imported from 3GU |
R4‑122565 | Discussion on UEM for MSR MR BS | Huawei | imported from 3GU |
R4‑122566 | Consideration on interference model for interfering cells with advanced receiver | ST-Ericsson, Ericsson | imported from 3GU |
R4‑122567 | Test configurations of inter-frequency/ RAT measurements for UEs configured with CA | NTT DOCOMO | imported from 3GU |
R4‑122568 | Test configurations of inter-frequency/ RAT measurements for UEs configured with CA | NTT DOCOMO | imported from 3GU |
R4‑122569 | Out-of-band blocking for inter-band CA | Huawei, HiSilicon | imported from 3GU |
R4‑122570 | Clarification on the number of monitoring layers for CA UEs | NTT DOCOMO | imported from 3GU |
R4‑122571 | Simulation results of NCT RSRP measurement performance | CATT | imported from 3GU |
R4‑122572 | Modification on NC CA BS requirement | CATT | imported from 3GU |
R4‑122573 | Clarification on the number of monitoring layers for CA UEs | NTT DOCOMO | imported from 3GU |
R4‑122574 | Proposal on UL Transmit Timing Error | ZTE | imported from 3GU |
R4‑122575 | TR 36.840 v0.4.0 | Huawei, HiSilicon | imported from 3GU |
R4‑122576 | A-MPR for CA in Band 38 | Huawei, HiSilicon | imported from 3GU |
R4‑122577 | CR for PRS BW definition and update RSTD accuracy requirements for rel-10 | LG Electronics | imported from 3GU |
R4‑122578 | CRS bandwidth of New Carrier Type | NTT DOCOMO | imported from 3GU |
R4‑122579 | TS 36.101 CR for CA_38 | Huawei, HiSilicon | imported from 3GU |
R4‑122580 | Consideration on the PRS channel bandwidth and tightening of RSTD accuracy for emergency situations | LG Electronics | imported from 3GU |
R4‑122581 | Consideration on the PRS channel bandwidth and tightening of RSTD accuracy for emergency situations | LG Electronics | imported from 3GU |
R4‑122582 | Time alignment error requirement for NC CA | ZTE | imported from 3GU |
R4‑122583 | TS 36.104 CR for CA_38 | Huawei, HiSilicon | imported from 3GU |
R4‑122584 | Draft Response LS on measurement handling for NCT | NTT DOCOMO | imported from 3GU |
R4‑122585 | TS 36.141 CR for CA_38 | Huawei, HiSilicon | imported from 3GU |
R4‑122586 | RF simulation results for CA_1C UE-to-UE coexistence with PHS and Band 34 | LG Electronics | imported from 3GU |
R4‑122587 | Preliminary simulation results for radio conditions for FeICIC | NTT DOCOMO | imported from 3GU |
R4‑122588 | CR for A-MPR masks for NS_CA_1C | LG Electronics | imported from 3GU |
R4‑122589 | System level simulatrions for FeICIC with 9dB CRE | Huawei, HiSilicon | imported from 3GU |
R4‑122590 | CR on FDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | imported from 3GU |
R4‑122591 | Considerations for enhanced Carrier Aggregation | ZTE | imported from 3GU |
R4‑122592 | CR for general MPR mask for multi-clustered simultaneous transmission in single CC in Rel-11 | LG Electronics | imported from 3GU |
R4‑122593 | Consideration on subframe shifting in FeICIC | NTT DOCOMO | imported from 3GU |
R4‑122594 | System Level simulation results for CoMP scenario 4 | Huawei, HiSilicon | imported from 3GU |
R4‑122595 | System Level simulation results for CoMP scenario 4 | Huawei, HiSilicon | imported from 3GU |
R4‑122596 | CR on FDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | LG Electronics | imported from 3GU |
R4‑122597 | E-UTRA medium range BS unwanted emission mask | CATT, Huawei, ZTE | imported from 3GU |
R4‑122598 | Simulation results for power imbalance for CA in Rel-10 | LG Electronics | imported from 3GU |
R4‑122599 | A definition of ABS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122600 | Simulation results for power imbalance for CA in Rel-10 | LG Electronics | imported from 3GU |
R4‑122601 | Simulation Results for CSI-RS RSRP measurement | Huawei, HiSilicon | imported from 3GU |
R4‑122602 | Simulation results for power imbalance for CA in Rel-10 | LG Electronics | imported from 3GU |
R4‑122603 | Simulation results for power imbalance for CA in Rel-10 | LG Electronics | imported from 3GU |
R4‑122604 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | imported from 3GU |
R4‑122605 | A General Definition of ABS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122606 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | imported from 3GU |
R4‑122607 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | imported from 3GU |
R4‑122608 | Draft LS for the CSI-RS measurement accuracy and feasibility | Huawei, HiSilicon | imported from 3GU |
R4‑122609 | Draft LS for the CSI-RS measurement accuracy and feasibility | Huawei, HiSilicon | imported from 3GU |
R4‑122610 | Draft LS for the CSI-RS measurement accuracy and feasibility | Huawei, HiSilicon | imported from 3GU |
R4‑122611 | Simulation results for soft buffer with impairment margins for UE cat3 and 4 | LG Electronics | imported from 3GU |
R4‑122612 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | LG Electronics | imported from 3GU |
R4‑122613 | TP for Relay backhaul link transmit OFF power | CATT | imported from 3GU |
R4‑122614 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122615 | A General Definition of ABS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122616 | CR on RLM test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | imported from 3GU |
R4‑122617 | Consideration of UE Transmitter architecture for intra-band non-contiguous CA | LG Electronics | imported from 3GU |
R4‑122618 | Consideration of UE Transmitter architecture for intra-band non-contiguous CA | LG Electronics | imported from 3GU |
R4‑122619 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122620 | Radio conditions for SI acquisition in UTRA FDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122621 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122622 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122623 | Consideration on E-UTRA medium range BS reference sensitivity | CATT | imported from 3GU |
R4‑122624 | CR on RLM test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | LG Electronics | imported from 3GU |
R4‑122625 | Radio conditions for SI acquisition in UTRA FDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122626 | Link level evaluation results on CSI-RS based RSRP measurements for CoMP | CATT | imported from 3GU |
R4‑122627 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122628 | Radio conditions for SI acquisition in UTRA FDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122629 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122630 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122631 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122632 | Simulation Results with impairement margin for eICIC demodulation performance under Non-MBSFN ABS in FDD | LG Electronics | imported from 3GU |
R4‑122633 | System simulation results on CSI-RS based RSRP measurements for CoMP | CATT | imported from 3GU |
R4‑122634 | Use of sample selection for emulating variable correlation in mode-stirred reverberation chambers | EMITE, CTTC, SP | imported from 3GU |
R4‑122635 | Text proposal on E-UTRA medium range BS reference sensitivity | CATT | imported from 3GU |
R4‑122636 | The Clarification for OCNG during ABS subframes in eICIC tests R10 | Huawei, HiSilicon, LG Electronics | imported from 3GU |
R4‑122637 | Simulation Results of PDSCH TM3 with impairement margin under Non-MBSFN ABS in FDD | LG Electronics | imported from 3GU |
R4‑122638 | The Clarification for OCNG during ABS subframes in eICIC tests R11 | Huawei, HiSilicon, LG Electronics | imported from 3GU |
R4‑122639 | RSRQ Measurement over Wide Measurement Bandwidth | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122640 | Evaluation result for Macro-Macro co-channel case | CATT | imported from 3GU |
R4‑122641 | Simulation Results of CQI for alignment | LG Electronics | imported from 3GU |
R4‑122642 | Preliminary Discussion on Inter-RAT SI Reading Tests | Huawei, HiSilicon | imported from 3GU |
R4‑122643 | Preliminary Discussion on Inter-RAT SI Reading Tests | Huawei, HiSilicon | imported from 3GU |
R4‑122644 | Preliminary Discussion on Inter-RAT SI Reading Tests | Huawei, HiSilicon | imported from 3GU |
R4‑122645 | Link Simulation Results for RSRQ Measurement over Wide Bandwidth | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122646 | Simulation Results with impairement margin for eICIC demodulation performance under MBSFN ABS in FDD | LG Electronics | imported from 3GU |
R4‑122647 | Interruption at Activation/Deactivation and Configuration/de-configuration of SCell | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122648 | Discussion on the necessity of introducing PBCH/D-BCH radio condition for CGI reading in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑122649 | TP for RAN4 co-existence study | CATT | imported from 3GU |
R4‑122650 | Definitions for CoMP | Huawei, HiSilicon | imported from 3GU |
R4‑122651 | Inter-frequency and Inter-RAT Requirements for Measurements without Measurement Gaps | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122652 | Response LS on feICIC | LG Electronics | imported from 3GU |
R4‑122653 | System level simulation results for Interference Conditions of FeICIC | LG Electronics | imported from 3GU |
R4‑122654 | Inter-frequency and Inter-RAT Requirements for Measurements without Measurement Gaps | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122655 | Methodology for PDP measurements using mode-stirred reverberation chambers | EMITE, CTTC | imported from 3GU |
R4‑122656 | Inter-frequency and Inter-RAT Requirements for Measurements without Measurement Gaps | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122657 | Discussion on the inter-frequency requirement for CA capability UE without GAP | Huawei, HiSilicon | imported from 3GU |
R4‑122658 | LS on feasibility study of FS_LTE_TDD_eIMTA | CATT | imported from 3GU |
R4‑122659 | Discussion on the inter-frequency requirement for CA capability UE without GAP | Huawei, HiSilicon | imported from 3GU |
R4‑122660 | Discussion on cell detection for 9dB CRE | LG Electronics | imported from 3GU |
R4‑122661 | Discussion on cell detection for 9dB CRE | LG Electronics | imported from 3GU |
R4‑122662 | Discussion on cell detection for 9dB CRE | LG Electronics | imported from 3GU |
R4‑122663 | Analysis of Requirements for RSRP and RSRQ for E-CID Positioning | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122664 | Correction to inter-frequency requirement for CA capability UE without GAP R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122665 | Simulation results of CSI RS RSRP | LG Electronics | imported from 3GU |
R4‑122666 | Simulation results of CSI RS RSRP | LG Electronics | imported from 3GU |
R4‑122667 | LS on TP for co-existence study of FS_LTE_TDD_eIMTA | CATT | imported from 3GU |
R4‑122668 | Requirements for RSRP and RSRQ for E-CID Positioning | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122669 | Text proposal on E-UTRA medium range BS blocking level | CATT | imported from 3GU |
R4‑122670 | Consideration on MB-MSR work | CATT | imported from 3GU |
R4‑122671 | Text proposal on E-UTRA medium range BS blocking level | CATT | imported from 3GU |
R4‑122672 | Correction to inter-frequency requirement for CA capability UE without GAP R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122673 | Impact of Reduced CRS in New Carrier Type on RRM requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122674 | The clarification for SCell activation/deactivation and configuration/ deconfiguration requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122675 | The clarification for SCell activation/deactivation and configuration/ deconfiguration requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122676 | The clarification for SCell activation/deactivation and configuration/ deconfiguration requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122677 | Corrections on CQI and PMI test | Huawei, HiSilicon | imported from 3GU |
R4‑122678 | Impact of 8C-HSDPA on demodulation performance | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122679 | Corrections on CQI and PMI test | Huawei, HiSilicon | imported from 3GU |
R4‑122680 | Introduction of 8C-HSDPA operation in 25.101 and rx core requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122681 | FRC for TDD PMI test | Huawei, HiSilicon | imported from 3GU |
R4‑122682 | Impact on TX core requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122683 | Impact of HSPA Multiflow on BS and UE RF requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122684 | REFSENS measurements of LTE devices | Telecom Italia | imported from 3GU |
R4‑122685 | FRC for TDD PMI test | Huawei, HiSilicon | imported from 3GU |
R4‑122686 | New band combination for 4C-HSDPA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122687 | Introduction of new band combinations I-2-VIII-2 and II-1-V-2 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122688 | Further consideration on CQI and PMI test | Huawei, HiSilicon | imported from 3GU |
R4‑122689 | Further consideration on SNR definition | Huawei, HiSilicon | imported from 3GU |
R4‑122690 | MOP requirements for UE(s) supporting Carrier aggregation in UTRA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122691 | Core requirement on interruption requirement of CA R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122692 | Way-forward proposals for Carrier Aggregation in multi-RAT and multi-band terminals | Telecom Italia, Orange, TeliaSonera AB | imported from 3GU |
R4‑122693 | Way-forward proposals for Carrier Aggregation in multi-RAT and multi-band terminals | Telecom Italia, Orange, TeliaSonera AB | imported from 3GU |
R4‑122694 | Core requirement on interruption requirement of CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122695 | MOP requirements for UE(s) supporting Carrier aggregation in UTRA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122696 | Clean-up of UL-MIMO for TS36.101 | Huawei, HiSilicon, China Telecom | imported from 3GU |
R4‑122697 | MOP requirements for UE(s) supporting Carrier aggregation in UTRA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122698 | On phase error model and performance impact | Huawei, HiSilicon | imported from 3GU |
R4‑122699 | Draft LS for glitch in CA | Huawei, HiSilicon | imported from 3GU |
R4‑122700 | Draft LS for glitch in CA | Huawei, HiSilicon | imported from 3GU |
R4‑122701 | MOP requirements for UE(s) supporting Carrier aggregation in UTRA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122702 | Discussion on quasi colocated antennas. | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122703 | Clean-up of UL-MIMO for TS36.101 | Huawei, HiSilicon, China Telecom | imported from 3GU |
R4‑122704 | eDL-MIMO RI requirement | Huawei, HiSilicon | imported from 3GU |
R4‑122705 | CQI performance results | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122706 | PMI performance results | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122707 | RI performance results | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122708 | Impact of TX phase misalignment on the CSI reporting | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122709 | Summary of eDL MIMO CSI simulation results | Huawei, HiSilicon | imported from 3GU |
R4‑122710 | CR for co-location spurious emission in TS25.104 | Huawei | imported from 3GU |
R4‑122711 | Time/frequency tracking and RRM measurements for New Carrier Type | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R4‑122712 | UE capability to support simultaneous transmission/reception for TDD inter-band CA | CMCC | imported from 3GU |
R4‑122713 | Clarification of the scope of Band a for 1.28 Mcps TDD option | CMCC, CATR, CATT, Huawei, ZTE | imported from 3GU |
R4‑122714 | Clarification of the scope of Band a for 1.28 Mcps TDD option | CMCC, CATR, CATT, Huawei, ZTE | imported from 3GU |
R4‑122715 | Clarification of the scope of Band a for 1.28 Mcps TDD option | CMCC, CATR, CATT, Huawei, ZTE | imported from 3GU |
R4‑122716 | Clarification of the scope of Band a for 1.28 Mcps TDD option | CMCC, CATR, CATT, Huawei, ZTE | imported from 3GU |
R4‑122717 | Discussion for UE receiver timing window testing | NTT DOCOMO | imported from 3GU |
R4‑122718 | Interruptions for Scell activation/deactivation | Nokia Corporation | imported from 3GU |
R4‑122719 | Interruptions for Scell activation/deactivation | Nokia Corporation | imported from 3GU |
R4‑122720 | Discussion for RI test scenario for eICIC | NTT DOCOMO | imported from 3GU |
R4‑122721 | Coexistence study and filter design for APAC700 TDD UE | CMCC | imported from 3GU |
R4‑122722 | Simulation results for MMSE-IRC receiver | NTT DOCOMO | imported from 3GU |
R4‑122723 | Multi-TA RRM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122724 | Discussion for TM2 and TM3 baseline receiver for MMSE-IRC | NTT DOCOMO | imported from 3GU |
R4‑122725 | Interband CA Class A2 MSD | Nokia Corporation | imported from 3GU |
R4‑122726 | The introduction of Multi-TA timing requirements R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122727 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122728 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122729 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122730 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122731 | Discussion on 1CC transmission in a TTI for uplink inter-band carrier aggregation | NTT DOCOMO | imported from 3GU |
R4‑122732 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122733 | [DRAFT] LS on 1CC transmission scheme for uplink inter-band carrier aggregation | NTT DOCOMO | imported from 3GU |
R4‑122734 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122735 | Non-contiguous intraband CA terminology and unwanted emission and ACLR discussion | Nokia Corporation | imported from 3GU |
R4‑122736 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122737 | TP of B7&B38 coexistence for LTE_CA_B7 | China Unicom, China Telecom | imported from 3GU |
R4‑122738 | Discussion for the reference sensitivity requirements for DL inter-band CA. | NTT DOCOMO | imported from 3GU |
R4‑122739 | Evaluation on prediction error for RFPM | Huawei, HiSilicon | imported from 3GU |
R4‑122740 | Discussion on inter-frequency RSTD measurement accuracy requirement in carrier aggregation | Huawei, HiSilicon | imported from 3GU |
R4‑122741 | Coexistence study results for medium range BS | NTT DOCOMO | imported from 3GU |
R4‑122742 | TDD UE co-existence requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122743 | TDD UE co-existence requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122744 | Draft LS Response on NCT | Qualcomm Incorporated | imported from 3GU |
R4‑122745 | Draft LS Response on NCT | Qualcomm Incorporated | imported from 3GU |
R4‑122746 | Clarification of uplink power control in TR36.942 | Huawei | imported from 3GU |
R4‑122747 | Clarification of uplink power control in TR36.942 | Huawei | imported from 3GU |
R4‑122748 | Draft LS Response on CSI-RS Based RSRP Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑122749 | Clarification of uplink power control in TR36.942 | Huawei | imported from 3GU |
R4‑122750 | NC-intraband UE RF terminology | Nokia Corporation | imported from 3GU |
R4‑122751 | E-UTRA to CDMA2000 1x Hand Over Delay | Qualcomm Incorporated | imported from 3GU |
R4‑122752 | SNR definition | Huawei, HiSilicon | imported from 3GU |
R4‑122753 | Correction of the manufacturer's declaration | Huawei | imported from 3GU |
R4‑122754 | NC-intraband UE RF unwanted emissions | Nokia Corporation | imported from 3GU |
R4‑122755 | Correction on power allocation parameters | Huawei, HiSilicon | imported from 3GU |
R4‑122756 | E-UTRA to CDMA2000 1x Hand Over Delay | Qualcomm Incorporated | imported from 3GU |
R4‑122757 | Further discussion on CA enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑122758 | Correction of the manufacturer's declaration | Huawei | imported from 3GU |
R4‑122759 | Addition of Annex A for draft specification for non-contiguos intraband CA UE RF aspects | Nokia Corporation | imported from 3GU |
R4‑122760 | Addition of Annex A for draft specification for non-contiguos intraband CA UE RF aspects | Nokia Corporation | imported from 3GU |
R4‑122761 | E-UTRA to CDMA2000 1x Hand Over Delay | Qualcomm Incorporated | imported from 3GU |
R4‑122762 | Conclusion on the co-existence study for remaining scenarios | Huawei | imported from 3GU |
R4‑122763 | E-UTRA to CDMA2000 1x Hand Over Delay | Qualcomm Incorporated | imported from 3GU |
R4‑122764 | CA configuration acronyms for non-contiguos intraband CA | Nokia Corporation | imported from 3GU |
R4‑122765 | Correction of test case for transmitter intermodulation requirement of BC1 | Huawei | imported from 3GU |
R4‑122766 | Correction of test case for transmitter intermodulation requirement of BC1 | Huawei | imported from 3GU |
R4‑122767 | CSG Proximity Testing | Qualcomm Incorporated | imported from 3GU |
R4‑122768 | CSG Proximity Testing | Qualcomm Incorporated | imported from 3GU |
R4‑122769 | Conclusion on the co-existence study for remaining scenarios | Huawei | imported from 3GU |
R4‑122770 | Interband CA 2 UL IMD measurements | Nokia Corporation | imported from 3GU |
R4‑122771 | Conclusion on the co-existence study for remaining scenarios | Huawei | imported from 3GU |
R4‑122772 | Remaining Issues at SCell Activation and Deactivation | Qualcomm Incorporated | imported from 3GU |
R4‑122773 | Cell Detection in Rel. 11 FeICIC | Qualcomm Incorporated | imported from 3GU |
R4‑122774 | LTE TRP and TRS test method development | Nokia Corporation | imported from 3GU |
R4‑122775 | Corrections for MSR and MSR-NC | Ericsson | imported from 3GU |
R4‑122776 | Corrections for MSR and MSR-NC | Ericsson | imported from 3GU |
R4‑122777 | BS classes Work Item TR 37.809 v0.3.0 | Ericsson | imported from 3GU |
R4‑122778 | Further comments on the RPD requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122779 | Removal of unnecessary references to single carrier requirements from Interband CA sub-clauses | Nokia Corporation | imported from 3GU |
R4‑122780 | TP for MR and LA BS Output power | Ericsson, , Nokia Siemens Networks | imported from 3GU |
R4‑122781 | FeICIC with MBSFN-ABS | Qualcomm Incorporated | imported from 3GU |
R4‑122782 | FeICIC with MBSFN-ABS | Qualcomm Incorporated | imported from 3GU |
R4‑122783 | On reusing band 41 requirements for Japan 2.5GHz TDD band | Huawei | imported from 3GU |
R4‑122784 | FeICIC with MBSFN-ABS | Qualcomm Incorporated | imported from 3GU |
R4‑122785 | TP for MR E-UTRA BS Operating band unwanted emissions | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑122786 | Dependence of UL configuration on carrier spacing | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122787 | Removal of unnecessary references to single carrier requirements from Interband CA sub-clauses | Nokia Corporation | imported from 3GU |
R4‑122788 | TP on co-existence analysis between APAC700 FDD BS with lower E850 BS | Huawei | imported from 3GU |
R4‑122789 | MR E-UTRA BS requirements derived from REFSENS | Ericsson | imported from 3GU |
R4‑122790 | In-gap interfering signal for ACS and blocking requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122791 | FeICIC with MBSFN-ABS | Qualcomm Incorporated | imported from 3GU |
R4‑122792 | TP for MR E-UTRA BS Reference Sensitivity | Ericsson | imported from 3GU |
R4‑122793 | Comments on MPR simulations for NC intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122794 | Comments on MPR simulations for NC intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122795 | CA_7C coexistence with Band 34 | Nokia Corporation | imported from 3GU |
R4‑122796 | TP for MR E-UTRA and MSR BS In-band Blocking requirement | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑122797 | TP for MR E-UTRA and MSR BS narrowband blocking | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑122798 | A-MPR study for Band 27 UEs | Nokia Corporation | imported from 3GU |
R4‑122799 | CSI-RS Based Measurements Link Level Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑122800 | Simulation assumptions for intra-frequency RRM measurement requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122801 | Simulation assumptions for intra-frequency RRM measurement requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122802 | TP for MR MSR BS Unwanted Emissions Mask (UEM) | Ericsson, Nokia Siemens Networks | imported from 3GU |
R4‑122803 | A-MPR tables for Band 27 | Nokia Corporation | imported from 3GU |
R4‑122804 | TAE requirement for intra-band non-contiguous CA | Huawei | imported from 3GU |
R4‑122805 | CA_1C coexistence with PHS and Band 34 | Nokia Corporation | imported from 3GU |
R4‑122806 | System Simulation Results for CSI-RS Based Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑122807 | TP for MR MSR BS Blocking limits for co-location | Ericsson | imported from 3GU |
R4‑122808 | Link Level Simulation Results for Advanced Receiver | MStar Semiconductor | imported from 3GU |
R4‑122809 | LA MSR BS Operating band unwanted emissions | Ericsson | imported from 3GU |
R4‑122810 | DL only band UE RF aspects | Nokia Corporation, AT&T | imported from 3GU |
R4‑122811 | Wideband RRM Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑122812 | Editorial simplification to CA REFSENS UL allocation table | Nokia Corporation | imported from 3GU |
R4‑122813 | TP for LA MSR BS Out-of-band blocking limits for co-location | Ericsson | imported from 3GU |
R4‑122814 | TP for TR 37.804 Band 8 UE emissions on Band 5 DL in Korea | Nokia Corporation | imported from 3GU |
R4‑122815 | TP for TR 37.804 Band 8 UE emissions on Band 5 DL in Korea | Nokia Corporation | imported from 3GU |
R4‑122816 | Scope and scenarios for MB-MSR | Ericsson | imported from 3GU |
R4‑122817 | MB-MSR Structure and RF requirements | Ericsson | imported from 3GU |
R4‑122818 | Discussion on RSRQ measurement for both serving cell and neighbour cell | Huawei, HiSilicon | imported from 3GU |
R4‑122819 | Discussion on RSRQ measurement for both serving cell and neighbour cell | Huawei, HiSilicon | imported from 3GU |
R4‑122820 | Discussion on RRM measurement for NCT | Huawei, HiSilicon | imported from 3GU |
R4‑122821 | Discussion on RRM measurement for NCT | Huawei, HiSilicon | imported from 3GU |
R4‑122822 | Discussion on RRM measurement for NCT | Huawei, HiSilicon | imported from 3GU |
R4‑122823 | UL emissions study for LTE Band 8 in Japan | Nokia Corporation | imported from 3GU |
R4‑122824 | UL emissions study for LTE Band 8 in Japan | Nokia Corporation | imported from 3GU |
R4‑122825 | UL emissions study for LTE Band 8 in Japan | Nokia Corporation | imported from 3GU |
R4‑122826 | Discussion on RRM measurement for NCT | Huawei, HiSilicon | imported from 3GU |
R4‑122827 | Draft LS for RSRP/RSRQ accuracy for new carrier type | Huawei, HiSilicon | imported from 3GU |
R4‑122828 | BS PIM Work Item TR 37.808 v0.1.0 | Ericsson | imported from 3GU |
R4‑122829 | TP on Mechanism for PIM generation | Ericsson | imported from 3GU |
R4‑122830 | Discussion on the transmit timing requirements | Huawei, HiSilicon | imported from 3GU |
R4‑122831 | PDCCH wrong detection in receiver spurious emissions test | Rohde & Schwarz | imported from 3GU |
R4‑122832 | PIM impact on sensitivity degradation | Ericsson | imported from 3GU |
R4‑122833 | TR 36.826 v 0.15.0 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122834 | PDCCH wrong detection in receiver spurious emissions test | Rohde & Schwarz | imported from 3GU |
R4‑122835 | Site configurations and site infrastructure impact on PIM | Ericsson | imported from 3GU |
R4‑122836 | TP for 36.116 Relay core requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122837 | APAC700 (TDD) emissions to DTV and Band 5 | Nokia Corporation | imported from 3GU |
R4‑122838 | PIM scenarios | Ericsson | imported from 3GU |
R4‑122839 | TP on PIM scenarios | Ericsson | imported from 3GU |
R4‑122840 | Discussion on the CP length assumption for Hetnet | Huawei, HiSilicon | imported from 3GU |
R4‑122841 | Draft LS for CP length assumption in Hetnet | Huawei, HiSilicon | imported from 3GU |
R4‑122842 | Correction to RLM requirements in eICIC with Autonomous gaps R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122843 | Band 1 and Band 34 coexistence revisited | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122844 | Correction to RLM requirements in eICIC with Autonomous gaps R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122845 | Supported bandwidth combinations for intra-band and inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122846 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R9 | Huawei, HiSilicon | imported from 3GU |
R4‑122847 | Supported bandwidth combinations for intra-band and inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122848 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122849 | Release-independent handling of band combinations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122850 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122851 | MOP requirements for UE(s) supporting Class A1-A3 combinations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122852 | Update of the Definition clause with repeaters operating band definition and introduction of minor editorial changes for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122853 | FDD CA RSTD Measurement Reporting Delay Test Case | Alcatel-Lucent, LGE | imported from 3GU |
R4‑122854 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R9 | Huawei, HiSilicon | imported from 3GU |
R4‑122855 | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | Alcatel-Lucent, LGE | imported from 3GU |
R4‑122856 | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | Alcatel-Lucent, LGE | imported from 3GU |
R4‑122857 | Maximum output power for inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122858 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122859 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122860 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122861 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122862 | Impact of HSDPA Multiflow introduction on BS requirements | Nokia Siemens Networks | imported from 3GU |
R4‑122863 | Maximum output power for inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122864 | In-band blocking requirements for B42/B43 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122865 | Update of the Definition clause with repeaters operating band definition and introduction of minor editorial changes for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122866 | Correction to E-UTRAN TDD redirection to UTRAN FDD test configuration R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122867 | Receiver RF requirements for UE(s) supporting Class A1-A3 with 1 UL | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122868 | Receiver RF requirements for inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122869 | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | Alcatel-Lucent, LGE | imported from 3GU |
R4‑122870 | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | Alcatel-Lucent, LGE | imported from 3GU |
R4‑122871 | Receiver RF requirements for inter-band carrier aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122872 | Correction to inter-frequency RSTD accuracy requirement in CA R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122873 | Correction to inter-frequency RSTD accuracy requirement in CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122874 | Band 26/XXVI and global harmonisation of bands | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122875 | Correction to RSTD measurement reporting delay requirement in CA R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122876 | APAC700 TDD and GPS inter-device protection | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122877 | APAC700 TDD (Band 44) emission requirement for protection of RNSS (GPS) | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122878 | Correction to RSTD measurement reporting delay requirement in CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122879 | Correction to RSTD measurement reporting delay requirement in CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122880 | Correction to RSTD measurement reporting delay requirement in CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122881 | Correction to RSTD measurement reporting delay requirement in CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122882 | Introduction of missing Spurious Emission and Input Intermodulation protection limits towards E-UTRA FDD Band 24, and E-UTRA TDD Band 33, 34, 38, 39, 40, 41, 42 and 43 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122883 | Discussion of the RS for additional carrier types for carrier aggregation enhancement | Alcatel-Lucent | imported from 3GU |
R4‑122884 | TP for 36.820: APAC700 TDD MOP, REFSENS and blocking requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122885 | Way forward for inter-band CA additional relaxations | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122886 | Add Band 25 Io values R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122887 | TP for 36.820: APAC700 FDD MOP and REFSENS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122888 | Add Band 25 Io values R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122889 | Introduction of missing Spurious Emission and Input Intermodulation protection limits towards E-UTRA FDD Band 24, and E-UTRA TDD Band 33, 34, 38, 39, 40, 41, 42 and 43 | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122890 | Definition clause updates with improved repeater pass band definition and introduction of minor editorial changes for for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122891 | APAC700 FDD protection of own receive band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122892 | Introduction of Requirements for CA Multiple Timing Advances | Alcatel-Lucent | imported from 3GU |
R4‑122893 | Add Band 25 Io values R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122894 | Add Band 25 Io values R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122895 | Add Band 25 Io values R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122896 | Add Band 25 Io values R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122897 | Clarification for cell identification condition in inter-RAT SI reading requirement R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122898 | Clarification for cell identification condition in inter-RAT SI reading requirement R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122899 | Clarification for cell identification condition in inter-RAT SI reading requirement R10 | Huawei, HiSilicon | imported from 3GU |
R4‑122900 | 2UL inter-band CA considerations | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122901 | 2UL inter-band CA considerations | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122902 | CELL_FACH measurements requirements for 2nd DRX cycle | Nokia Siemens Networks | imported from 3GU |
R4‑122903 | BS test uncertainties above 3 GHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122904 | CELL_FACH measurements requirements for 2nd DRX cycle | Nokia Siemens Networks | imported from 3GU |
R4‑122905 | Handover Delay Requirement from E-UTRAN to cdma2000 1x | Alcatel-Lucent | imported from 3GU |
R4‑122906 | [Draft] Reply LS on Handover Delay Requirement from E-UTRAN to cdma2000 1x | Alcatel-Lucent | imported from 3GU |
R4‑122907 | Clarification for cell identification condition in inter-RAT SI reading requirement R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122908 | Clarification for cell identification condition in inter-RAT SI reading requirement R11 | Huawei, HiSilicon | imported from 3GU |
R4‑122909 | BS test uncertainties above 3 GHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122910 | BS test uncertainties above 3 GHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122911 | BS test uncertainties above 3 GHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122912 | Definition clause updates with improved repeater pass band definition and introduction of minor editorial changes for for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122913 | Text Proposal on Multiple Timing Advances and Random Access of the SCell | Alcatel-Lucent | imported from 3GU |
R4‑122914 | Corrections to 3500 MHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122915 | Japanese LTE 900MHz co-existence study | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122916 | Corrections to 3500 MHz | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122917 | UE co-existence requirements for TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122918 | Update of the upper frequency limit for Spurious Emissions | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122919 | UE co-existence requirements for TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122920 | Update of the upper frequency limit for Spurious Emissions | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122921 | UE co-existence requirements for TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122922 | Random Access requirements for SCell | Alcatel-Lucent | imported from 3GU |
R4‑122923 | UE co-existence requirements for TDD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122924 | Demodulation test setup for MBSFN ABS configuration | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122925 | Update of the protection limits tables for spurious emission and input intermodulation | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122926 | Additional BC3 blocking | Ericsson | imported from 3GU |
R4‑122927 | Additional BC3 blocking | Ericsson | imported from 3GU |
R4‑122928 | 8 TX PMI simulation results | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122929 | Impact of Reference Sensitivity Relaxation of Carrier Aggregations on RRM Requirements | Alcatel-Lucent | imported from 3GU |
R4‑122930 | Update of the protection limits tables for spurious emission and input intermodulation | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122931 | Additional BC3 blocking | Ericsson | imported from 3GU |
R4‑122932 | 8 TX PMI simulation results | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122933 | Criteria discussion for eICIC CQI test | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122934 | Additional BC3 blocking | Ericsson | imported from 3GU |
R4‑122935 | 8 TX PMI simulation results | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122936 | LA co-existence/co-location | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122937 | Introduction of editorial changes for better alignment with BS test specification in the maximum limits tables for operating band unwanted emissions test requirements | Andrew Wireless Systems, Powerwave Technologies | imported from 3GU |
R4‑122938 | Text Proposal on RRM Requirements for Inter-Band CA Classes | Alcatel-Lucent | imported from 3GU |
R4‑122939 | LA co-existence/co-location | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122940 | eDL-MIMO CQI reporting under fading condition | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122941 | Further considerations on testing CSG proximity function | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122942 | Editorial correction of the TDD eNB test model configuration in TS 36.141 | Ericsson | imported from 3GU |
R4‑122943 | TP for TR ab.cde (Inter-Band CA): Update of definitions, symbols and abbreviations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122944 | eDL-MIMO CQI reporting under fading condition | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122945 | Co-existence/co-location between LA TDD systems | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122946 | eDL-MIMO CQI reporting under fading condition | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122947 | Single cell indoor deployment where CRS ports are not co-located | Andrew Wireless Systems | imported from 3GU |
R4‑122948 | Co-existence/co-location between LA TDD systems | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122949 | Baseline reference implementation for CSG Proximity Detection Testing | Alcatel-Lucent | imported from 3GU |
R4‑122950 | eDL-MIMO CQI reporting under fading condition | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122951 | Compatibility between B14 HPUE and 700MHz BS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122952 | TP for 36.820: APAC700 UE emissions towards DTV | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122953 | CSG Proximity Detection Testing Case | Alcatel-Lucent | imported from 3GU |
R4‑122954 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122955 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122956 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122957 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122958 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122959 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122960 | Text Proposal on AAS demodulation performance | Ericsson | imported from 3GU |
R4‑122961 | Introduction of Band 28 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122962 | TP for TR ab.cde (inter-band CA): deltaTIB for CA_3-7 | TeliaSonera AB | imported from 3GU |
R4‑122963 | Text proposal on AAS areas to Study | Ericsson | imported from 3GU |
R4‑122964 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122965 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122966 | TP on AAS Scenarios | Ericsson | imported from 3GU |
R4‑122967 | Simulation results of the impact of B14 PS HPUE on B13 network UL performances | EADS/Cassidian | imported from 3GU |
R4‑122968 | TP on transmitter spatial domain aspects | Ericsson | imported from 3GU |
R4‑122969 | Simulation results for RI test | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122970 | TP on receiver spatial domain aspects | Ericsson | imported from 3GU |
R4‑122971 | Corrections on SNR definition and power allocation settings | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122972 | Clarification of cell FACH measurement requirements | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122973 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122974 | Alignment results for Rel-10 eICIC demodulation test cases | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122975 | Measurement requirements relating to the introduction of the 2nd DRX cycle | Ericsson, ST Ericsson | imported from 3GU |
R4‑122976 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122977 | Performance requirement for TTI length selection in eCELL_FACH | Ericsson, ST Ericsson | imported from 3GU |
R4‑122978 | Considerations on reference symbol transmission bandwidth for new carrier type | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122979 | On CQI tests for Rel-10 eICIC | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122980 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122981 | CSG proximity detection | Ericsson, ST Ericsson | imported from 3GU |
R4‑122982 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122983 | Preliminary considerations on interference conditions for feICIC | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122984 | HS-DPCCH TX power step size requirement | Ericsson, ST Ericsson | imported from 3GU |
R4‑122985 | Link level simulation results for CSI-RS RSRP measurement feasibility study | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122986 | ACS and narrow band blocking requirement for E-UTRA medium range BS | CATT | imported from 3GU |
R4‑122987 | In-channel selectivity requirement for E-UTRA medium range BS | CATT | imported from 3GU |
R4‑122988 | UE impact of non-colocated antenna deployments | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑122989 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122990 | Correction to HS-DPCCH TX power step size requirement | Ericsson, ST Ericsson | imported from 3GU |
R4‑122991 | Correction to HS-DPCCH TX power step size requirement | Ericsson, ST Ericsson | imported from 3GU |
R4‑122992 | CQI test setup for non-MBSFN ABS configuration | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122993 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122994 | Further considerations on measurements without gaps | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑122995 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122996 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122997 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑122998 | Text proposal: Collection of AAS RF performance test methods | Ericsson | imported from 3GU |
R4‑122999 | Framework document for advanced receivers work item | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123000 | E-UTRA MR BS receiver dynamic range | CATT | imported from 3GU |
R4‑123001 | E-UTRA MR BS receiver intermodulation requirement | CATT | imported from 3GU |
R4‑123002 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123003 | Requirements for UE that support measurements without gaps | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123004 | Text proposal: Collection of AAS RF performance test methods | Ericsson | imported from 3GU |
R4‑123005 | Further considerations on interference modelling | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123006 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123007 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123008 | CQI test setup for non-MBSFN ABS configuration | Ericsson, ST Ericsson | imported from 3GU |
R4‑123009 | Introduction of Band 44 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123010 | AAS spatial performance simulation results | Ericsson | imported from 3GU |
R4‑123011 | AAS spatial performance simulation results | Ericsson | imported from 3GU |
R4‑123012 | Band 8 UE in Japan | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123013 | APAC700 FDD BS spurious emissions towards Band 27 UL | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123014 | MIMO OTA simulation using Agilent SystemVue | Agilent Technologies | imported from 3GU |
R4‑123015 | Requirements for UE that support measurements without gaps | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123016 | MIMO OTA simulation using Agilent SystemVue | Agilent Technologies | imported from 3GU |
R4‑123017 | Lower E850 UE spurious emissions towards APAC700 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123018 | High level views on design of requirements scenarios | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123019 | CQI test setup for non-MBSFN ABS configuration | Ericsson, ST Ericsson | imported from 3GU |
R4‑123020 | MIMO OTA simulation using Agilent SystemVue | Agilent Technologies | imported from 3GU |
R4‑123021 | Measurement performance requirements for cell FACH with longer DRX cycles | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123022 | MIMO OTA simulation using Agilent SystemVue | Agilent Technologies | imported from 3GU |
R4‑123023 | On the number of interfering cells in advanced receiver test cases | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123024 | Editorial corrections | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123025 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | imported from 3GU |
R4‑123026 | Editorial corrections | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123027 | Link level performance evaluation of advanced receivers | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123028 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | imported from 3GU |
R4‑123029 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123030 | Target SNR setting for eICIC demodulation requirement | Ericsson, ST Ericsson | imported from 3GU |
R4‑123031 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | imported from 3GU |
R4‑123032 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123033 | Summary of link level performance evaluation | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123034 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123035 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123036 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑123037 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | imported from 3GU |
R4‑123038 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑123039 | TP for TR 37.977, Verification of Channel Model Implementations | Elektrobit, Spirent, Satimo Industries, Intel, Motorola Mobility | imported from 3GU |
R4‑123040 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑123041 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑123042 | OCNG correction in Phase I eICIC test cases | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123043 | Further discussion of RSRQ measurement bandwidth | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123044 | OCNG correction in Phase I eICIC test cases | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123045 | Alignment of Notes in Phase I eICIC tests | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123046 | Alignment of Notes in Phase I eICIC tests | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123047 | Increased bandwidth RSRQ measurements for serving cell | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123048 | Target SNR setting for eICIC demodulation requirement | Ericsson, ST Ericsson | imported from 3GU |
R4‑123049 | ABS definition used in test cases in 36.133 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123050 | ABS definition used in test cases in 36.133 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123051 | Increased bandwidth RSRQ measurements for serving cell | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123052 | On FeICIC receiver for up to 9 dB CRE bias | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123053 | System simulation results for FeICIC with zero-power ABS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123054 | On cell identification with FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123055 | On CP length in FeICIC-specific requirements | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑123056 | Considerations on retuning interruptions | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123057 | LS response on the CP length assumption with FeICIC | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑123058 | On inter-frequency measurements for FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123059 | Performing measurements in the presence of aggressor interference | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123060 | BS impact and UTDOA performance with different UTDOA deployments | Ericsson | imported from 3GU |
R4‑123061 | Further considerations on CA power imbalance test method | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123062 | LS response on UL RTOA definition | Ericsson | imported from 3GU |
R4‑123063 | On UL positioning parameters | Ericsson | imported from 3GU |
R4‑123064 | Considerations on the coverage of 36.101 for SIB1 reception in autonomous gap | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123065 | LS response on UL positioning parameters | Ericsson | imported from 3GU |
R4‑123066 | LEE TRP TRS measurement results | Vodafone Group | imported from 3GU |
R4‑123067 | On error modeling for RFPM simulations | Ericsson | imported from 3GU |
R4‑123068 | Clarification on the signals/Channels transmitted in ABS/Non-ABS subframe | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123069 | PRS bandwidth in RSTD accuracy requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123070 | Considerations on interfrequency RSRQ for feICIC | Renesas Mobile Europe Ltd, | imported from 3GU |
R4‑123071 | PRS bandwidth in RSTD accuracy requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123072 | Deployment Scenarios and Assumptions | Alcatel-Lucent | imported from 3GU |
R4‑123073 | Clarification on the signals/Channels transmitted in ABS/Non-ABS subframe | Ericsson, ST Ericsson | imported from 3GU |
R4‑123074 | Discussion on Rel-11 feICIC work | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑123075 | Updated simulation results for eICIC demodulation test cases | CMCC | imported from 3GU |
R4‑123076 | Antenna Model for AAS | Alcatel-Lucent | imported from 3GU |
R4‑123077 | Antenna Model for AAS | Alcatel-Lucent | imported from 3GU |
R4‑123078 | Simulation results for eICIC CQI report tests | CMCC | imported from 3GU |
R4‑123079 | AAS RF Requirements | Alcatel-Lucent | imported from 3GU |
R4‑123080 | Simulation results for eICIC tests with MBSFN ABS | CMCC | imported from 3GU |
R4‑123081 | Further Considerations of Combined Conducted-OTA Approach | Alcatel-Lucent | imported from 3GU |
R4‑123082 | REFSENS simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123083 | REFSENS simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123084 | Text Proposal for Testing Methodologies | Alcatel-Lucent | imported from 3GU |
R4‑123085 | AAS example applications | Ericsson | imported from 3GU |
R4‑123086 | Example of reference structure parameterization | Ericsson | imported from 3GU |
R4‑123087 | Blocking simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123088 | Blocking simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123089 | Blocking simulation results for E-UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123090 | Parameters for MB-MSR | Ericsson | imported from 3GU |
R4‑123091 | Text Proposal for Combined Conducted-OTA Approach | Alcatel-Lucent | imported from 3GU |
R4‑123092 | Text Proposal for Combined Conducted-OTA Approach | Alcatel-Lucent | imported from 3GU |
R4‑123093 | Introduction of APAC700(FDD) into TS 36.113 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123094 | Editorial simplification to CA REFSENS UL allocation table | Nokia Corporation | imported from 3GU |
R4‑123095 | Introduction of APAC700(FDD) into TS 36.124 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123096 | Interfrequency RSRQ for FeICIC | Alcatel-Lucent and Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑123097 | Simulation results and discussion on test case for MMSE-IRC advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑123098 | Power control setting parameters for E-UTRA MR co-existence simulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123099 | Power control setting parameters for E-UTRA MR co-existence simulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123100 | MIMO OTA simulation usign Agilent SystemVue | Agilent Technologies | imported from 3GU |
R4‑123101 | Power control setting parameters for E-UTRA MR co-existence simulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123102 | Power control setting parameters for E-UTRA MR co-existence simulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123103 | Introduction of APAC700(FDD) into TS 36.307 Rel-8 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123104 | Power control setting parameters for E-UTRA MR co-existence simulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123105 | Introduction of APAC700(FDD) into TS 36.307 Rel-9 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123106 | Introduction of APAC700(FDD) into TS 36.307 Rel.10 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123107 | LS on RSRQ Interfrequency Measurements | Alcatel-Lucent | imported from 3GU |
R4‑123108 | Draft LS on RSRQ Interfrequency Measurements | Alcatel-Lucent | imported from 3GU |
R4‑123109 | Introduction of APAC700(FDD) into TS 36.307 Rel-11 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123110 | Introduction of APAC700(FDD) into TS 37.113 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123111 | Introduction of APAC700(TDD) into TS 36.113 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123112 | Proposed test cases for MMSE-IRC advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑123113 | FDD TDD co-existence requirement correction | Nokia Corporation | imported from 3GU |
R4‑123114 | Proposed test cases for MMSE-IRC advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑123115 | Introduction of APAC700(TDD) into TS 36.124 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123116 | Feasibility Studies Summary | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑123117 | Introduction of APAC700(TDD) into TS 36.307 Rel-8 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123118 | Introduction of APAC700(TDD) into TS 36.307 Rel-9 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123119 | Introduction of APAC700(TDD) into TS 36.307 Rel.10 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123120 | Test cases proposal for MMSE-IRC advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑123121 | Introduction of APAC700(TDD) into TS 36.307 Rel-11 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123122 | Correction of wrong table refernces in CA receiver tests | Nokia Corporation | imported from 3GU |
R4‑123123 | A comparison of UE architectures with respect to additional ILs when supporting multi-CAs, multi-LTE bands and/or multi-RATs | TeliaSonera AB | imported from 3GU |
R4‑123124 | Coexistence Interference Mitigation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑123125 | Introduction of APAC700(TDD) into TS 37.113 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123126 | Coexistence Interference Mitigation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑123127 | Coexistence Interference Mitigation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑123128 | TR 36.820 v 0.6.0 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123129 | Correction of wrong table refernces in CA receiver tests | Nokia Corporation | imported from 3GU |
R4‑123130 | REFSENS simulation results for E-UTRA to UTRA MR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123131 | Draft LS on Conclusion of Feasibility Studies | Alcatel-Lucent | imported from 3GU |
R4‑123132 | Draft LS on Conclusion of Feasibility Studies | Alcatel-Lucent | imported from 3GU |
R4‑123133 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123134 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123135 | Interband CA relaxations | Nokia Corporation | imported from 3GU |
R4‑123136 | Time alignment error headline | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123137 | Time alignment error headline | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123138 | Time alignment error headline | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123139 | Time alignment procedure in 36.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123140 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123141 | Time alignment error headline | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123142 | Time alignment procedure in 36.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123143 | MIMO OTA simulation using Agilent SystemVue | Agilent Technologies | imported from 3GU |
R4‑123144 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123145 | Introduction of CA band combination Band4 + Band13 to TS 36.104 | Alcatel-Lucent | imported from 3GU |
R4‑123146 | Introduction of CA band combination Band4 + Band13 to TS 36.104 | Alcatel-Lucent | imported from 3GU |
R4‑123147 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123148 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123149 | Introduction of CA band combination Band4 + Band13 to TS 36.104 | Alcatel-Lucent | imported from 3GU |
R4‑123150 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123151 | Text modification to scope of TR37.977 | Nokia Corporation, Intel, Elektrobit, Spirent, CATR, Satimo | imported from 3GU |
R4‑123152 | Correction to numbers of HS-SCCH for DC-HSDPA | Rohde & Schwarz | imported from 3GU |
R4‑123153 | HeNB Autonomous Power Setting for Macro-eNB Scenario (Option B). | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123154 | On modulation order for interfering cells | Nokia Corporation | imported from 3GU |
R4‑123155 | Discussion on the framework for MMSE-IRC test cases | Huawei, HiSilicon | imported from 3GU |
R4‑123156 | Introduction of CA band combination Band4 + Band13 to TS 36.104 | Alcatel-Lucent | imported from 3GU |
R4‑123157 | Tools for hand+head phantom OTA testing | Nokia Corporation | imported from 3GU |
R4‑123158 | Introduction of CA band combination Band4 + Band13 to TS 36.104 | Alcatel-Lucent | imported from 3GU |
R4‑123159 | Ideal results for receiver requirements for PUCCH format 2 with DTX | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123160 | On modulation order for interfering cells | Nokia Corporation | imported from 3GU |
R4‑123161 | On modulation order for interfering cells | Nokia Corporation | imported from 3GU |
R4‑123162 | Introduction of CA band combination Band4 + Band13 to TS 36.141 | Alcatel-Lucent | imported from 3GU |
R4‑123163 | BS time alignment error | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123164 | Introduction of e850_LB Band 27 to TS 25.101 | NII Holdings, Huawei, Motorola Mobility | imported from 3GU |
R4‑123165 | Introduction of Requirements for Multiple Timing Advances for Carrier Aggregation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑123166 | Introduction of CA band combination Band4 + Band17 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑123167 | Introduction of CA band combination Band4 + Band17 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑123168 | On time domain interference modeling | Nokia Corporation | imported from 3GU |
R4‑123169 | Introduction of CA band combination Band4 + Band17 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑123170 | Mechanical Requirements of Hand Phantoms | Nokia Corporation | imported from 3GU |
R4‑123171 | Introduction of e850_LB (Band 27) to TS 25.104 | NII Holdings, Huawei, Motorola Mobility | imported from 3GU |
R4‑123172 | Proposal of test cases for MMSE-IRC advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑123173 | Dielectric Property Measurements of hand phantoms | Nokia Corporation | imported from 3GU |
R4‑123174 | Link level performance of advanced receivers for the LTE UE | Nokia Corporation | imported from 3GU |
R4‑123175 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products for Band Combination (5 + 12) | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑123176 | Measurement uncertainty update due to use of hand phantoms. | Nokia Corporation | imported from 3GU |
R4‑123177 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products for Non-contiguous Carrier Aggregation of Band 25 | Alcatel-Lucent | imported from 3GU |
R4‑123178 | Definition of left hand phantoms | Nokia Corporation | imported from 3GU |
R4‑123179 | Introduction of e850_LB (Band 27) to TS 25.104 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123180 | Recommendations on reference sensitivity for E-UTRA Medium Range BS | Alcatel-Lucent | imported from 3GU |
R4‑123181 | medium-range BS simulation results | Nokia Siemens Networks | imported from 3GU |
R4‑123182 | Introduction of e850_LB (Band 27) to TS 25.106 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123183 | Draft WID for LTE Advanced Carrier Aggregation of Band 25 and Band 26 | Sprint | imported from 3GU |
R4‑123184 | Introduction of e850_LB (Band 27) to TS 25.123 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123185 | LS Response on the RS for additional carrier types for carrier aggregation enhancement | Nokia Corporation | imported from 3GU |
R4‑123186 | Introduction of e850_LB (Band 27) to TS 25.133 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123187 | Inter-frequency measurements without gaps | Nokia Corporation | imported from 3GU |
R4‑123188 | Introduction of e850_LB (Band 27) to TS 25.141 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123189 | Text Proposal on reference sensitivity for E-UTRA Medium Range BS | Alcatel-Lucent | imported from 3GU |
R4‑123190 | Text Proposal on reference sensitivity for E-UTRA Medium Range BS | Alcatel-Lucent | imported from 3GU |
R4‑123191 | Introduction of e850_LB (Band 27) to TS 25.143 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123192 | Inter-frequency measurements without gaps | Nokia Corporation | imported from 3GU |
R4‑123193 | Introduction of e850_LB (Band 27) to TS 25.461 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123194 | Introduction of e850_LB (Band 27) to TS 25.466 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123195 | TP on output power requirements for MSR LA BS | Alcatel Lucent | imported from 3GU |
R4‑123196 | Introduction of e850_LB (Band 27) to TS 36.101 | NII Holdings, Huawei, Motorola Mobility | imported from 3GU |
R4‑123197 | Information on recent cell_fach agreements | Alcatel-Lucent | imported from 3GU |
R4‑123198 | Introduction of e850_LB (Band 27) to TS 36.104 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123199 | Introduction of e850_LB (Band 27) to TS 36.106 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123200 | Introduction of e850_LB (Band 27) to TS 36.113 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123201 | Introduction of e850_LB (Band 27) to TS 36.124 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123202 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123203 | Introduction of e850_LB (Band 27) to TS 36.133 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123204 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123205 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123206 | Introduction of e850_LB (Band 27) to TS 36.141 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123207 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123208 | Introduction of e850_LB (Band 27) to TS 36.143 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123209 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123210 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123211 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123212 | Introduction of e850_LB (Band 27) to TS 36.307 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123213 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123214 | Introduction of e850_LB (Band 27) to TS 36.307 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123215 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123216 | Introduction of e850_LB (Band 27) to TS 36.307 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123217 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123218 | Introduction of e850_LB (Band 27) to TS 36.307 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123219 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123220 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123221 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123222 | Clarifications on REFSENS Values | Intel | imported from 3GU |
R4‑123223 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123224 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123225 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123226 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123227 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123228 | TP of adding smaller bandwidth support in CA_4-12 for Inter-band TR ab.cde | Leap,US Cellular,C Spire, MetroPCS, Huawei | imported from 3GU |
R4‑123229 | Introduction of e850_LB (Band 27) to TS 37.104 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123230 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123231 | Spurious Emission Simulation Results | Intel | imported from 3GU |
R4‑123232 | Introduction of e850_LB (Band 27) to TS 37.113 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123233 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123234 | Introduction of e850_LB (Band 27) to TS 37.141 | NII Holdings, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑123235 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123236 | Additional spurious emissions requirements for PHS | Fujitsu | imported from 3GU |
R4‑123237 | An analysis of radiated directivity patterns of a UE performing MRC in the presence of single-polarized and dual-polarized wave fronts | Intel | imported from 3GU |
R4‑123238 | TP of adding smaller bandwidth support in CA_4-12 for Inter-band TR ab.cde | Leap,US Cellular,C Spire,MetroPCS,Huawei | imported from 3GU |
R4‑123239 | TP of adding smaller bandwidth support in CA_4-12 for Inter-band TR ab.cde | Huawei,Leap,Cox,US Cellular,C Spire,MetroPCS | imported from 3GU |
R4‑123240 | Way Forward for Utilizing Absolute Radiated Data Throughput for MIMO OTA Methodology Calibration | Intel, Motorola Mobility, Elektrobit | imported from 3GU |
R4‑123241 | Left-handed mono-block and fold phantom grips and spacers | Intel | imported from 3GU |
R4‑123242 | TP for legacy deployment MB-MSR | alcatel-Lucent | imported from 3GU |
R4‑123243 | Link levle simulation results of MMSE-IRC advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑123244 | Left-handed narrow data and PDA phantom grips and spacers | Intel | imported from 3GU |
R4‑123245 | CR to introduce left hand phantoms to TR25.914 | Intel | imported from 3GU |
R4‑123246 | Consideration on RSRQ measurement BW | Nokia Corporation | imported from 3GU |
R4‑123247 | Link level performance analysis of CSI-RS based RSRP measurements | Intel | imported from 3GU |
R4‑123248 | Simulation results for the eDL-MIMO CQI test in fading channel | ZTE Corporation | imported from 3GU |
R4‑123249 | Discussion on system level analysis of CSI-RS based RSRP measurements | Intel | imported from 3GU |
R4‑123250 | Simulation results for eDL-MIMO RI tests | ZTE Corporation | imported from 3GU |
R4‑123251 | Simulation results for eICIC TM2 demodulation | ZTE Corporation | imported from 3GU |
R4‑123252 | TP on output power dynamics for MB-MSR | alcatel-Lucent | imported from 3GU |
R4‑123253 | TDD CA soft buffer test | Intel | imported from 3GU |
R4‑123254 | Simulation results for eICIC PDSCH TM3 rank-2 demodulation | ZTE Corporation | imported from 3GU |
R4‑123255 | Simulation results for eICIC PDSCH TM3 rank-2 demodulation | ZTE Corporation | imported from 3GU |
R4‑123256 | TP on operating bands and categories for MB-MSR | Alcatel-Lucent | imported from 3GU |
R4‑123257 | Simulation results for eICIC CQI test | ZTE Corporation | imported from 3GU |
R4‑123258 | Further considerations about CA power imbalance simulation | Intel | imported from 3GU |
R4‑123259 | Simulation results for eDL-MIMO TDD PMI test | ZTE Corporation | imported from 3GU |
R4‑123260 | Simulation results for eDL-MIMO TDD PMI test | ZTE Corporation | imported from 3GU |
R4‑123261 | Simulation results for eDL-MIMO TDD PMI test | ZTE Corporation | imported from 3GU |
R4‑123262 | Advanced receiver link-level performance evaluation and test setup | Intel | imported from 3GU |
R4‑123263 | System level simulation results for FeICIC | ZTE Corporation | imported from 3GU |
R4‑123264 | System level simulation results for FeICIC | ZTE Corporation | imported from 3GU |
R4‑123265 | System level evaluation of CSI-RS RSRP measurement | ZTE Corporation | imported from 3GU |
R4‑123266 | Evaluating self interference using UE reports | Agilent Technologies | imported from 3GU |
R4‑123267 | Role of static channel matrices for UE performance evaluation | Agilent Technologies | imported from 3GU |
R4‑123268 | TRP and TRS measurements for LEE (Laptop Embedded Equipment) devices | Orange | imported from 3GU |
R4‑123269 | Proposal for TRP minimum performance requirements for LEE (Laptop Embedded Equipment) devices | Orange, Vodafone | imported from 3GU |
R4‑123270 | Proposal for TRS minimum performance requirements for LEE (Laptop Embedded Equipment) devices | Orange, Vodafone | imported from 3GU |
R4‑123271 | TP for TR 37.977 on SCME UMi and UMa Channel Models | Spirent Communications, Elektrobit, SATIMO, Intel, Motorola Mobility, Nokia | imported from 3GU |
R4‑123272 | Band 27 A-MPR Evaluation | Motorola Mobility | imported from 3GU |
R4‑123273 | TP of adding smaller bandwidth support in CA_4-12 for Inter-band TR ab.cde | Leap, Cox, US Cellular, C Spire, MetroPCS, Huawei | imported from 3GU |
R4‑123274 | Extending the two-channel method for additional implementation of channel models | Rohde & Schwarz | imported from 3GU |
R4‑123275 | First results on reference antennas using the two-channel method | Rohde & Schwarz | imported from 3GU |
R4‑123276 | System level studies of intra-frequency FeICIC | Intel | imported from 3GU |
R4‑123277 | Summary of simulation results for eICIC demodulation test cases | Intel | imported from 3GU |
R4‑123278 | Evaluation of eICIC CQI testing framework | Intel | imported from 3GU |
R4‑123279 | Further Discussion on Applicability of the Enhanced Performance Requirements Type 2 | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123280 | 900 MHz UE coexistence in Korea | Qualcomm Incorporated | imported from 3GU |
R4‑123281 | Meeting minutes of MIMO OTA ad-hoc session RAN4#63 | Vodafone Group | imported from 3GU |
R4‑123282 | SNR reference values for FDD CA soft buffer tests | Intel | imported from 3GU |
R4‑123283 | MSD Issues for Inter Band CA Class A2 | Motorola Mobility | imported from 3GU |
R4‑123284 | 900 MHz UE coexistence in Japan | Qualcomm Incorporated | imported from 3GU |
R4‑123285 | Lower e850 - APAC700 FDD UE-UE coexistence | NII Holdings | imported from 3GU |
R4‑123286 | UE spurious emissions requirements for Band 1 to Band 33 and Band 39 | Qualcomm Incorporated | imported from 3GU |
R4‑123287 | Requirement for eDL-MIMO fading CQI and RI tests | Intel | imported from 3GU |
R4‑123288 | UE spurious emissions requirements for Band 1 to Band 33 and Band 39 | Qualcomm Incorporated | imported from 3GU |
R4‑123289 | Clarification on applicability of the enhanced performance requirements type 2 | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123290 | Random PMI granularity for eDL-MIMO tests | Intel | imported from 3GU |
R4‑123291 | Simulation results for synchronous network operation | Qualcomm Incorporated | imported from 3GU |
R4‑123292 | UE spurious emissions requirements for Band 1 to Band 33 and Band 39 | Qualcomm Incorporated | imported from 3GU |
R4‑123293 | Calibration Error modelling for eDL-MIMO tests | Intel | imported from 3GU |
R4‑123294 | UE spurious emissions requirements for Band 1 to Band 33 and Band 39 | Qualcomm Incorporated | imported from 3GU |
R4‑123295 | Further considerations of asynchronous network operation | Qualcomm Incorporated | imported from 3GU |
R4‑123296 | Further considerations of asynchronous network operation | Qualcomm Incorporated | imported from 3GU |
R4‑123297 | Simulation assumptions for asynchronous network operation | Qualcomm Incorporated | imported from 3GU |
R4‑123298 | Band 1 and Band 33/39 coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑123299 | Deterministic analysis for Macro-Macro co-channel case in LTE TDD eIMTA | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑123300 | CSI feedback requirements for advanced receivers | Qualcomm Incorporated | imported from 3GU |
R4‑123301 | CSI feedback requirements for advanced receivers | Qualcomm Incorporated | imported from 3GU |
R4‑123302 | CSI feedback requirements for advanced receivers | Qualcomm Incorporated | imported from 3GU |
R4‑123303 | Clarification of random precoding granularity in TM6 PMI tests | Intel | imported from 3GU |
R4‑123304 | Further discussion on relaxations for class A1 CA band combinations | Qualcomm Incorporated, Motorola Mobility | imported from 3GU |
R4‑123305 | Further discussion on UE front-end architecture for inter-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑123306 | Reference sensitivity for non-contiguous intra-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑123307 | MSD for Band 4 and Band 17 carrier aggregation | Qualcomm Incorporated | imported from 3GU |
R4‑123308 | Diplexing and quadplexing between Band 5 and Band 12 | Qualcomm Incorporated | imported from 3GU |
R4‑123309 | A-MPR for Band 27 UE coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑123310 | APT700 TDD filter response | Qualcomm Incorporated | imported from 3GU |
R4‑123311 | 700 SDL UE RF Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑123312 | Cubic metric analysis for DC-HSUPA 16 QAM | Qualcomm Incorporated | imported from 3GU |
R4‑123313 | Link level simulations for FeICIC with 9dB cell range expansion | Qualcomm Incorporated | imported from 3GU |
R4‑123314 | Additional reference measurement channels for DC-HSUPA | Qualcomm Incorporated | imported from 3GU |
R4‑123315 | Further analysis of the impact of non-collocated antennas | Qualcomm Incorporated | imported from 3GU |
R4‑123316 | Inter frequency search for configured but de-activated frequenc(ies) without compressed mode | Qualcomm Incorporated | imported from 3GU |
R4‑123317 | Transmit Modulation Quality for CA | Qualcomm Inc | imported from 3GU |
R4‑123318 | [Draft] Response LS on enhanced performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑123319 | Reply LS on antenna ports co-location | Qualcomm Incorporated | imported from 3GU |
R4‑123320 | Baseline UE reference architecture for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑123321 | Carrier Aggregation Channel Bandwidth Combination Sets | Qualcomm Incorporated | imported from 3GU |
R4‑123322 | Relative phase discontinuity model for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑123323 | CR - Transmit Modulation Quality for CA | Qualcomm Inc | imported from 3GU |
R4‑123324 | UE transmit time alignment error requirements for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑123325 | CR - Transmit Modulation Quality for CA | Qualcomm Inc | imported from 3GU |
R4‑123326 | NodeB performance requirements for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑123327 | CR on channel bandwidth combination sets | Qualcomm Incorporated | imported from 3GU |
R4‑123328 | Multi-Cluster Single CC MPR Results | Motorola Mobility | imported from 3GU |
R4‑123329 | UE Rx core requirements for non-contiguous 4C-HSDPA | Qualcomm Incorporated | imported from 3GU |
R4‑123330 | NCT time and frequency tracking performance issues | Qualcomm Incorporated | imported from 3GU |
R4‑123331 | Link level performance results for MMSE-IRC receiver | Broadcom Corporation | imported from 3GU |
R4‑123332 | CR on Time-Alignment Error for Intra-band Non-Contiguous CA | Broadcom Corporation | imported from 3GU |
R4‑123333 | Relative Propagation Delay Difference for Intra-band Contiguous CA | Broadcom Corporation | imported from 3GU |
R4‑123334 | Collocated and Non-Collocated Intra-band Contiguous Carrier Aggregation | Broadcom Corporation | imported from 3GU |
R4‑123335 | NS_CA_1C MPR to Protect PHS and Band 34 | Qualcomm Inc | - |
R4‑123336 | Single Carrier Multi-cluster MPR and A-MPR | Qualcomm Inc | - |
R4‑123337 | Pcmax Tolerances for CA | Qualcomm Inc | - |
R4‑123338 | CR Pcmax Tolerances for CA | Qualcomm Inc | - |
R4‑123339 | CA_38 to B7 Coexistence | Qualcomm Inc | - |
R4‑123340 | MBSFN-ABS RLM test case | Qualcomm Inc | - |
R4‑123341 | UE demodulation performance requirements for 4 adjacent carriers in a single band | Qualcomm Inc | - |
R4‑123342 | Updated guard band analysis for band XXVI coexistence requirements | Qualcomm Inc | - |
R4‑123343 | Guard bands for band XXVI additional coexistence requirements | Qualcomm Inc | - |
R4‑123344 | Introduction of Absolute Priority Based Cell Reselection to CELL_FACH in 25.133 | Qualcomm Inc | - |
R4‑123345 | Correction of PHS protection requirements for TS 25.101 | NTT DOCOMO, SOFTBANK MOBILE | - |
R4‑123346 | Correction of PHS protection requirements for TS 25.101 | NTT DOCOMO, SOFTBANK MOBILE | - |
R4‑123347 | Correction of PHS protection requirements for TS 25.101 | NTT DOCOMO, SOFTBANK MOBILE | - |
R4‑123348 | Correction of PHS protection requirements for TS 25.101 | NTT DOCOMO, SOFTBANK MOBILE | - |
R4‑123349 | Correction of PHS protection requirements for TS 36.101 | NTT DOCOMO, SOFTBANK MOBILE, KDDI | - |
R4‑123350 | Correction of PHS protection requirements for TS 36.101 | NTT DOCOMO, SOFTBANK MOBILE, KDDI | - |
R4‑123351 | Correction of PHS protection requirements for TS 36.101 | NTT DOCOMO, SOFTBANK MOBILE, KDDI | - |
R4‑123352 | Correction of PHS protection requirements for TS 36.101 | NTT DOCOMO, SOFTBANK MOBILE, KDDI | - |
R4‑123353 | Introduction of Band 28 into TS36.101 | NTT DOCOMO | - |
R4‑123354 | Optimization of supported E-UTRA bandwidths per CA configuration for B1+B19 | NTT DOCOMO | - |
R4‑123355 | TP for TR ab.cde (inter-band CA): Diplexer data update for CA_1_21 | NTT DOCOMO | - |
R4‑123356 | IQ image requirements and Band 34 protection from Band 1 | NTT DOCOMO | - |
R4‑123357 | Correction of PHS protection requirements for TS 25.104 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123358 | Correction of PHS protection requirements for TS 25.104 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123359 | Correction of PHS protection requirements for TS 25.104 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123360 | Correction of PHS protection requirements for TS 25.104 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123361 | Correction of PHS protection requirements for TS 25.141 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123362 | Correction of PHS protection requirements for TS 25.141 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123363 | Correction of PHS protection requirements for TS 25.141 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123364 | Correction of PHS protection requirements for TS 25.141 | NTT DOCOMO, SOFTBANK Mobile | - |
R4‑123365 | TP for MR E-UTRA BS Demodulation Performance | NTT DOCOMO | - |
R4‑123366 | TP for output power of MR E-UTRA BS | NTT DOCOMO | - |
R4‑123367 | TR 37.804 v0.4.0 (UMTS/LTE in 900 MHz band SI) | NTT DOCOMO | - |
R4‑123368 | On co-existence study of AAS | NTT DOCOMO | - |
R4‑123369 | Ideal simulation result of PUCCH format 2 performance with DTX detection | NTT DOCOMO | - |
R4‑123370 | Proposed revision of subclause 4.3A for TS36.101 | China Telecom, Huawei | - |
R4‑123371 | Proposed revision of subclause 4.3A for TS36.101 | China Telecom, Huawei | - |
R4‑123372 | Proposed revision on subclause 6.3.4A for TS36.101 | China Telecom, Huawei | - |
R4‑123373 | Proposed revision on subclause 6.3.4A for TS36.101 | China Telecom, Huawei | - |
R4‑123374 | Introduction of hand phantom to TR25.914 | Nokia Corporation | - |
R4‑123375 | Handover Delay Requirement from E-UTRAN to cdma2000 1x ( Source: , To: , Cc: ) | 3GPP2 | - |
R4‑123376 | LS on Summary of RAN1 agreements on Further Enhancements to CELL_FACH (R1-121818 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑123377 | LS on the RS for additional carrier types for carrier aggregation enhancement (R1-121900 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: TSG RAN WG2) | TSG RAN WG1 | - |
R4‑123378 | LS on ITU-T response LS (R1-120864) to NGMN LS (RP-110476) on coordination between ITU-T and 3GPP on synchronization (R1-121911 Source: TSG RAN WG1, To: TSG RAN, Cc: TSG RAN WG3,TSG RAN WG4) | TSG RAN WG1 | - |
R4‑123379 | LS on the Definition of the CoMP Resource Management Set (R1-121912 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG3,TSG RAN WG4) | TSG RAN WG1 | - |
R4‑123380 | LS response on antenna ports co-location (R1-121919 Source: TSG RAN WG1], To: TSG RAN WG4, Cc: ) | TSG RAN WG1] | - |
R4‑123381 | LS on feICIC (R1-121920 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑123382 | LS response on UL positioning parameters (R1-121921 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑123383 | Reply LS on Clarifications on solutions for 3G Macro to Femto hand-in for non-CSG UEs (R2-121897 Source: TSG RAN WG2, To: TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG2 | - |
R4‑123384 | RAN2 status on CA enhancements (R2-121974 Source: TSG RAN WG2, To: TSG RAN WG1,TSG RAN WG4, Cc: ) | TSG RAN WG2 | - |
R4‑123385 | Response LS on network-based positioning (R3-120899 Source: TSG RAN WG3, To: TSG RAN WG2, Cc: TSG RAN WG1,TSG RAN WG4) | TSG RAN WG3 | - |
R4‑123386 | LS response on Physical Layer Measurement for Network Positioning (R3-120901 Source: TSG RAN WG3, To: TSG RAN WG1, Cc: TSG RAN WG2,TSG RAN WG4) | TSG RAN WG3 | - |
R4‑123387 | LS on TR skeleton for Rel-11 SI on FS_LTE_TDD_eIMTA (R1-121918 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑123388 | Simulation results for TDD dynamic UL/DL configuration UE-UE interferenc | Qualcomm Incorporated | - |
R4‑123389 | Measurement Results Analysis on CTIA MIMO 2X2 Reference Antennas produced by SATIMO | SATIMO Industries, Motorola Mobility | - |
R4‑123390 | Correction of DC-HSUPA core requirements: new RMC introduction | ST-Ericsson, Ericsson | - |
R4‑123391 | Correction of DC-HSUPA core requirements: new test points introduction | ST-Ericsson, Ericsson | - |
R4‑123392 | Correction of DC-HSUPA core requirements | ST-Ericsson, Ericsson | - |
R4‑123393 | Correction of DC-HSUPA core requirements | ST-Ericsson, Ericsson | - |
R4‑123394 | Correction of DC-HSUPA core requirements | ST-Ericsson, Ericsson | - |
R4‑123395 | Introduction of non-contiguous 4C-HSDPA core requirements definition | ST-Ericsson, Ericsson | - |
R4‑123396 | CLTD baseline reference Transmitter architecture choice | ST-Ericsson, Ericsson | - |
R4‑123397 | Add requirements for inter-band CA of B_1-18 and B_11-18 in TS36.101 | KDDI | - |
R4‑123398 | Add Inter-band CA of B_1-18 and B_11-18 in TS36.104 | KDDI | - |
R4‑123399 | Add Inter-band CA of B_1-18 and B_11-18 in TS36.141 | KDDI | - |
R4‑123400 | Aligning requirements between Band 18 and Band 26 in TS36.101 | KDDI | - |
R4‑123401 | Correction of PHS protection requirements for TS 36.104 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123402 | Correction of PHS protection requirements for TS 36.104 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123403 | Correction of PHS protection requirements for TS 36.104 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123404 | Correction of PHS protection requirements for TS 36.104 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123405 | Correction of PHS protection requirements for TS 36.141 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123406 | Correction of PHS protection requirements for TS 36.141 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123407 | Correction of PHS protection requirements for TS 36.141 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123408 | Correction of PHS protection requirements for TS 36.141 | KDDI, SOFTBANK MOBILE, NTT DOCOMO | - |
R4‑123409 | Correction of PHS protection requirements for TS 36.106 | KDDI | - |
R4‑123410 | Correction of PHS protection requirements for TS 36.106 | KDDI | - |
R4‑123411 | Correction of PHS protection requirements for TS 36.106 | KDDI | - |
R4‑123412 | Correction of PHS protection requirements for TS 36.143 | KDDI | - |
R4‑123413 | Correction of PHS protection requirements for TS 36.143 | KDDI | - |
R4‑123414 | Correction of PHS protection requirements for TS 36.143 | KDDI | - |
R4‑123415 | New Work Item proposal: Intra-band contiguous carrier aggregation of Band 1 | KDDI | - |
R4‑123416 | Simulation results of PUCCH format 2 with DTX detection | Nokia Siemens Network | - |
R4‑123417 | Capacity Experiments with Reference Antennas in Isotropic Environment | Azimuth Systems | - |
R4‑123418 | LTE Advanced Carrier Aggregation of Band 12 and Band 25 | C Spire | - |
R4‑123419 | Measurement Method for Rx Diversity (PAG-12-049r1-LS_To_CTIA_Rxdiversity_antenna Source: GCF Performance Criteria Agreement Group, To: TSG RAN WG4, Cc: PTCRB) | GCF Performance Criteria Agreement Group | - |
R4‑123420 | Reply to LS on OTA measurement methodology (PAG-12-050-LS_reply_to_RAN_4 Source: GCF Performance Agreement Group (PAG), To: 3GPP TSG RAN4, Cc: GCF Conformance and Interoperability Agreement Group (CAG), 3GPP TSG RAN WG5 (RAN5)) | GCF Performance Agreement Group (PAG) | - |
R4‑123421 | A simple hand phantom representing the full range of antenna impedances found with real users | EPCOS NL | - |
R4‑123422 | Receiver RF requirements for UE(s) supporting Class A1-A3 with 1 UL | Ericsson, ST-Ericsson | - |
R4‑123423 | Receiver RF requirements for inter-band carrier aggregation | Ericsson, ST-Ericsson | - |
R4‑123424 | Receiver RF requirements for inter-band carrier aggregation | Ericsson, ST-Ericsson | - |
R4‑123425 | Additional spurious emissions requirements for PHS | Fujitsu | - |
R4‑123426 | Link level performance results for MMSE-IRC receiver | Broadcom Corporation | - |
R4‑123427 | Update on the Status of Radiated Testing Methods for MIMO OTA Performance within CTIA (CTIA MOSG LS to 3GPP_RAN4_RAN5_Prague_Corrected Source: CTIA MIMO OTA Sub Group (MOSG), To: TSG RAN WG4,TSG RAN WG5, Cc: ) | CTIA MIMO OTA Sub Group (MOSG) | - |
R4‑123428 | CTIA response to 3GPP RAN4 R4-115483 (CPWG120508-5-R1 Source: CTIA ERP Working Group, To: RAN4, Cc: ) | CTIA ERP Working Group | - |
R4‑123429 | Reply LS on Work Item on RF Requirements for Multi-band and Multi-standard radio (MB-MSR) Base Station (GP-120546) (GP-120765 Source: TSG GERAN WG1, To: TSG RAN WG4, Cc: TSG RAN) | TSG GERAN WG1 | - |
R4‑123430 | LS on Status of the work on multicarrier BTS classes (GP-120699 Source: TSG GERAN WG1, To: TSG RAN WG4, Cc: ) | TSG GERAN WG1 | - |
R4‑123431 | RAN4#62Bis Meeting Report | ETSI Secretariat | - |
R4‑123432 | Introduction of e850_LB (Band 27) to TS 25.104 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123433 | Introduction of e850_LB (Band 27) to TS 36.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123434 | Introduction of e850_LB (Band 27) to TS 25.423 | NII Holdings | - |
R4‑123435 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R8) | SOFTBANK MOBILE | - |
R4‑123436 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R9) | SOFTBANK MOBILE | - |
R4‑123437 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R10) | SOFTBANK MOBILE | - |
R4‑123438 | Introduction of Japanese Regulatory Requirements to W-CDMA Band VIII (R11) | SOFTBANK MOBILE | - |
R4‑123439 | CR for co-location spurious emission in TS25.104 | Huawei | - |
R4‑123440 | On UE behavior in the uplink subframe after measurement GAP | CATT, Ericsson, ST-Ericsson | - |
R4‑123441 | On UE behavior in the uplink subframe after measurement GAP | CATT, Ericsson, ST-Ericsson | - |
R4‑123442 | Add Band 25 Io values R10 | Huawei, HiSilicon | - |
R4‑123443 | Add Band 25 Io values R11 | Huawei, HiSilicon | - |
R4‑123444 | Updated simulation results for advanced receiver | LG Electronics | - |
R4‑123445 | Simulation results of advanced receiver in asynchronous network | LG Electronics | - |
R4‑123446 | Simulation results for CSI-RS based RSRP measurement accuracy | Samsung | - |
R4‑123447 | Clarification of cell FACH measurement requirements | Renesas Mobile Europe Ltd | - |
R4‑123448 | CA & eICIC RRM Adhoc Minutes, 21 May 2012 | Renesas Mobile Europe Ltd | - |
R4‑123449 | Simulation results for PUCCH format 2 DTX detection function | Samsung | - |
R4‑123450 | CSI-RS Based Measurements Link Level Simulation Results | Qualcomm Incorporated | - |
R4‑123451 | eICIC FDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | - |
R4‑123452 | eICIC FDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | - |
R4‑123453 | eICIC TDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | - |
R4‑123454 | eICIC TDD out-of-sync RLM test case in MBSFN ABS | NTT DOCOMO | - |
R4‑123455 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | - |
R4‑123456 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | LG Electronics | - |
R4‑123457 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R10 | Huawei, HiSilicon | - |
R4‑123458 | In-Sync RLM test case in MBSFN ABS for E-UTRAN FDD R11 | Huawei, HiSilicon | - |
R4‑123459 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R10 | Huawei, HiSilicon | - |
R4‑123460 | In-Sync RLM test case in MBSFN ABS for E-UTRAN TDD R11 | Huawei, HiSilicon | - |
R4‑123461 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123462 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123463 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123464 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123465 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R9 | Huawei, HiSilicon | - |
R4‑123466 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R10 | Huawei, HiSilicon | - |
R4‑123467 | Correction to E-UTRAN FDD/TDD - UTRAN FDD /TDD enhanced cell identification test case R11 | Huawei, HiSilicon | - |
R4‑123468 | LS for glitch in CA | Huawei, HiSilicon | - |
R4‑123469 | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | Alcatel-Lucent, LGE | - |
R4‑123470 | FDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | Alcatel-Lucent, LGE | - |
R4‑123471 | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-10) | Alcatel-Lucent, LGE | - |
R4‑123472 | TDD CA RSTD Measurement Reporting Delay Test Case (Rel-11) | Alcatel-Lucent, LGE | - |
R4‑123473 | Collection of link simulation results of pUCCH format 2 performance with DTX detection | Nokia Siemens Networks, Huawei, Ericsson, Samsung | - |
R4‑123474 | WF on PUCCH format 2 performance requirements with DTX detection | Nokia Siemens Networks, Huawei, Ericsson, Samsung | - |
R4‑123475 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123476 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123477 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123478 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123479 | Clarification on the number of monitoring layers for CA UEs | NTT DOCOMO | - |
R4‑123480 | Clarification on the number of monitoring layers for CA UEs | NTT DOCOMO | - |
R4‑123481 | SNR reference values for FDD CA soft buffer tests | Intel | - |
R4‑123482 | SNR reference values for FDD CA soft buffer tests | Intel | - |
R4‑123483 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | - |
R4‑123484 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | - |
R4‑123485 | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | - |
R4‑123486 | Intra-Frequency TDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | - |
R4‑123487 | Simulation results for CA power imbalance | Qualcomm Incorporated | - |
R4‑123488 | Introduction of Absolute Priority Based Cell Reselection to CELL_FACH in 25.133 | Qualcomm Inc | - |
R4‑123489 | Correction of CSI configuraiton for CA TM4 tests R10 | Huawei | - |
R4‑123490 | Correction of CSI configuraiton for CA TM4 tests R11 | Huawei | - |
R4‑123491 | Update of the Definition clause with repeaters operating band definition and introduction of minor editorial changes for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑123492 | Update of the Definition clause with repeaters operating band definition and introduction of minor editorial changes for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑123493 | Clarification of uplink power control in TR36.942 | Huawei | - |
R4‑123494 | Clarification of uplink power control in TR36.942 | Huawei | - |
R4‑123495 | Clarification of uplink power control in TR36.942 | Huawei | - |
R4‑123496 | Evaluating self interference using UE reports | Agilent Technologies, CATR | - |
R4‑123497 | Proposed revision of subclause 4.3A for TS36.101 | China Telecom, Huawei | - |
R4‑123498 | Proposed revision of subclause 4.3A for TS36.101 | China Telecom, Huawei | - |
R4‑123499 | CA_B5-B12: Core requirements text proposal | Nokia, Qualcomm, Samsung, US Cellular | - |
R4‑123500 | e850_LB ad-hoc session minutes | Huawei | - |
R4‑123501 | Proposed revision on subclause 6.3.4A for TS36.101 | China Telecom, Huawei | - |
R4‑123502 | Proposed revision on subclause 6.3.4A for TS36.101 | China Telecom, Huawei | - |
R4‑123503 | Clean-up of UL-MIMO for TS36.101 | Huawei, HiSilicon, China Telecom | - |
R4‑123504 | Clean-up of UL-MIMO for TS36.101 | Huawei, HiSilicon, China Telecom | - |
R4‑123505 | Time alignment procedure in 36.141 | Ericsson, ST-Ericsson | - |
R4‑123506 | Time alignment procedure in 36.141 | Ericsson, ST-Ericsson | - |
R4‑123507 | TP for TR 37.977, Verification of Channel Model Implementations | Elektrobit, Spirent, Satimo Industries, Intel, Motorola Mobility | - |
R4‑123508 | Update of the protection limits tables for spurious emission and input intermodulation | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑123509 | Update of the protection limits tables for spurious emission and input intermodulation | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑123510 | Text Proposal for TR37.804 on band arrangement and UE evaluation result of band 8 in Japan | SoftBank Mobile | - |
R4‑123511 | New WI Proposal: Introduction of LTE band 8 to Japan | Softbank Mobile | - |
R4‑123512 | LTE Advanced Carrier Aggregation of Band 12 and Band 25 | C Spire | - |
R4‑123513 | Aligning requirements between Band 18 and Band 26 in TS36.101 | KDDI | - |
R4‑123514 | Text modification to scope of TR37.977 | Nokia Corporation, Intel, Elektrobit, Spirent, CATR, Satimo | - |
R4‑123515 | TP for 36.116 Relay core requirements | Ericsson, ST-Ericsson | - |
R4‑123516 | Way Forward for Utilizing Absolute Radiated Data Throughput for MIMO OTA Methodology Comparison | Intel, Motorola Mobility, Elektrobit, Spirent, SATIMO,^^Agilent, Nokia | - |
R4‑123517 | TP for TR ab.cde (inter-band CA): Diplexer data update for CA_1_21 | NTT DOCOMO | - |
R4‑123518 | AAS Adhoc meeting minutes | Huawei | - |
R4‑123519 | Way Forward on AAS Tx ACLR Requirement | Alcatel Lucent | - |
R4‑123520 | MIMO OTA Way Forward | Vodafone | - |
R4‑123521 | AAS antenna modelling Way Forward | Huawei | - |
R4‑123522 | Measurement Results Analysis on CTIA MIMO 2X2 Reference Antennas produced by SATIMO | SATIMO Industries, Motorola Mobility | - |
R4‑123523 | CTIA MIMO OTA Sub Group (MOSG) Report to RAN4 | AT&T | - |
R4‑123524 | TP on receiver spatial domain aspects | Ericsson | - |
R4‑123525 | TP for MB-MSR application scenarios | Huawei | - |
R4‑123526 | TP for TR 37.977, Verification of Channel Model Implementations | Elektrobit, Spirent, Satimo Industries, Intel, Motorola Mobility | - |
R4‑123527 | definitions and terminology for MB-MSR | Huawei | - |
R4‑123528 | LME and LEE clarification to measurements of radio performance for terminals on uncertainty contributions in measurements | ZTE | - |
R4‑123529 | CR to introduce left hand phantoms to TR25.914 | Intel | - |
R4‑123530 | eICIC demodulation ad hoc minutes | Huawei | - |
R4‑123531 | Some clarifications and OCNG pattern for eICIC demodulation requirements | Huawei,HiSilicon | - |
R4‑123532 | Some clarifications and OCNG pattern for eICIC demodulation requirements | Huawei,HiSilicon | - |
R4‑123533 | Introduction of PDCCH test with colliding RS on MBSFN-ABS | Huawei,HiSilicon | - |
R4‑123534 | Introduction of PDCCH test with colliding RS on MBSFN-ABS | Huawei,HiSilicon | - |
R4‑123535 | PMI performance results | Ericsson, ST-Ericsson | - |
R4‑123536 | RI performance results | Ericsson, ST-Ericsson | - |
R4‑123537 | RFPM Inclusion in E-UTRAN TR 36.809 v0.2.0 | Polaris Wireless | - |
R4‑123538 | WF on RFPM modeling error | Polaris | - |
R4‑123539 | LS response on the CP length assumption with FeICIC | Ericsson, ST-Ericsson, AT&T | - |
R4‑123540 | 36.826 TP: OCNG pattern for R-PDCCH demodulation performance requirements | Huawei | - |
R4‑123541 | Text Proposal on RRM Requirements for Inter-Band CA Classes | Alcatel-Lucent | - |
R4‑123542 | The introduction of Multi-TA timing requirements R11 | Huawei, HiSilicon | - |
R4‑123543 | SNR definition | Huawei, HiSilicon | - |
R4‑123544 | SNR definition | Huawei | - |
R4‑123545 | LS on the SNR definition for UE performance tests and CSI tests | Huawei | - |
R4‑123546 | WF on CSG proximity detection | Alcatel Lucent | - |
R4‑123547 | Meeting minutes for RFPM ad hoc | Polaris | - |
R4‑123548 | Draft LS Response to Physical Layer Measurement for network positioning | TruePosition | - |
R4‑123549 | LS response on UL positioning parameters | Ericsson | - |
R4‑123550 | WF on UTDOA Work Plan | TP | - |
R4‑123551 | Meeting minutes for eDL-MIMO and geographically separated antennas ad hoc session on Wednesday evening | Intel | - |
R4‑123552 | LS response on NCT | Ericsson | - |
R4‑123553 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | - |
R4‑123554 | Summary of alignment results for CA demod with power imbalance | Renesas | - |
R4‑123555 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | - |
R4‑123556 | Addition of E-UTRAN FDD RSTD measurement accuracy test case in carrier aggregation R11 | Huawei, HiSilicon | - |
R4‑123557 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R10 | Huawei, HiSilicon | - |
R4‑123558 | Addition of E-UTRAN TDD RSTD measurement accuracy test case in carrier aggregation R11 | Huawei, HiSilicon | - |
R4‑123559 | Clarification for cell identification condition in inter-RAT SI reading requirement R10 | Huawei, HiSilicon | - |
R4‑123560 | Clarification for cell identification condition in inter-RAT SI reading requirement R11 | Huawei, HiSilicon | - |
R4‑123561 | WF on feICIC system level simulations | Huawei | - |
R4‑123562 | Target SNR setting for eICIC demodulation requirement | Ericsson, ST Ericsson | - |
R4‑123563 | Extension of static eICIC CQI test | Qualcomm Incorporated | - |
R4‑123564 | WF on simulation assumptions for evaluating delta CQI in the eICIC CQI test | Qualcomm | - |
R4‑123565 | WF on simulation assumptions on geographically separated antennas | Qualcomm | - |
R4‑123566 | WF on feICIC reference receiver | Qualcomm | - |
R4‑123567 | CR on CA UE receiver timing window R10 | DCM | - |
R4‑123568 | CR on CA UE receiver timing window R11 | DCM | - |
R4‑123569 | WF on RSRQ measurement bandwidth | NTT Docomo | - |
R4‑123570 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | - |
R4‑123571 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | - |
R4‑123572 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | - |
R4‑123573 | RRM: Clarifications to the OCNG patterns | Rohde & Schwarz | - |
R4‑123574 | Way forward on CSI-RS Measurement Accuracy | 6,28 | - |
R4‑123575 | LS on CSI-RS RSRP measuremnet link level simulation campaign | 6,28 | - |
R4‑123576 | Meeting minutes for advanced receier ad hoc | 6.25.1 | - |
R4‑123577 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123578 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123579 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123580 | Correction of a timer period in inter-frequency measurement tests | Ericsson, ST-Ericsson | - |
R4‑123581 | TP for TRab.cde (LTE TRP TRS) General updating from existing standards | CATR | - |
R4‑123582 | TP for TR ab.cde (inter-band CA) on IMD study of B1 + B7 CA | China Telecom | - |
R4‑123583 | CA_B5-B12: Core requirements text proposal | Nokia, Qualcomm, Samsung, US Cellular | - |
R4‑123584 | Introduction of non-contiguous 4C-HSDPA core requirements definition | ST-Ericsson, Ericsson | - |
R4‑123585 | Introduction of 8C-HSDPA operation in 25.101 and rx core requirements | Ericsson, ST-Ericsson | - |
R4‑123586 | Introduction of OLTD into 25.101 | Huawei, HiSilicon, Magnolia Broadband | - |
R4‑123587 | Correction of test case for transmitter intermodulation requirement of BC1 | Huawei | - |
R4‑123588 | Correction of test case for transmitter intermodulation requirement of BC1 | Huawei | - |
R4‑123589 | Introduction of e850_LB Band 27 to TS 25.101 | NII Holdings, Huawei, Motorola Mobility | - |
R4‑123590 | Lower e850 BS-BS and UE-UE coexistence way forward | NII Holding | - |
R4‑123591 | TP for RAN4 co-existence study | CATT | - |
R4‑123592 | Introduction of e850_LB (Band 27) to TS 25.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123593 | Introduction of e850_LB (Band 27) to TS 36.104 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123594 | Introduction of e850_LB (Band 27) to TS 36.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123595 | Introduction of e850_LB (Band 27) to TS 37.104 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123596 | Introduction of e850_LB (Band 27) to TS 37.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123597 | Reply LS to GCF PAG on LTE OTA work in 3GPP RAN4 | Orange | - |
R4‑123598 | Band 28/44 ad-hoc minutes | Ericsson, ST-Ericsson | - |
R4‑123599 | Introduction of e850_LB (Band 27) to TS 36.101 | NII Holdings, Huawei, Motorola Mobility | - |
R4‑123600 | Introduction of e850_LB Band 27 to TS 25.101 | NII Holdings, Huawei, Motorola Mobility | - |
R4‑123601 | Backdating CA_41C to Rel-10 | Clearwire | - |
R4‑123602 | [DRAFT] LS on 1CC transmission scheme for uplink inter-band carrier aggregation | NTT DOCOMO | - |
R4‑123603 | Introduction of Band 44 | Ericsson, ST-Ericsson | - |
R4‑123604 | TP on GPS requirements | Ericsson, ST-Ericsson | - |
R4‑123605 | 3GPP TR 36.837 v0.2.0 | Motorola Solutions | - |
R4‑123606 | TP for MR E-UTRA BS In-band Blocking requirement | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, ZTE | - |
R4‑123607 | TP for MR E-UTRA BS narrowband blocking | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, ZTE | - |
R4‑123608 | Ad hoc minutes: BS classes | Ericsson | - |
R4‑123609 | Way forward for E-UTRA MR BS reference sensitivity and blocking | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, | - |
R4‑123610 | TP for MR E-UTRA BS ACS | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, | - |
R4‑123611 | TP for MR E-UTRA BS In-channels selectivity | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, | - |
R4‑123612 | TP for MR E-UTRA BS Receiver dynamic range | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, | - |
R4‑123613 | TP for 36.820: APAC700 TDD MOP, REFSENS and blocking requirements | Ericsson, ST-Ericsson | - |
R4‑123614 | TP on co-existence analysis between APAC700 FDD BS with lower E850 BS | Huawei | - |
R4‑123615 | Introduction of e850_LB (Band 27) to TS 25.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123616 | Introduction of Band 44 | Ericsson, ST-Ericsson | - |
R4‑123617 | Introduction of Band 44 | Ericsson, ST-Ericsson | - |
R4‑123618 | Introduction of Band 28 | Ericsson, ST-Ericsson | - |
R4‑123619 | UE capability to support simultaneous transmission/reception for TDD inter-band CA | CMCC | - |
R4‑123620 | Update of the Definition clause with repeaters operating band definition and introduction of minor editorial changes for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑123621 | Update of the Definition clause with repeaters operating band definition and introduction of minor editorial changes for better alignment with BS core specification | Andrew Wireless Systems, Powerwave Technologies | - |
R4‑123622 | TP for TR 37.804 Study of E-UTRA specific issues | KT | - |
R4‑123623 | MB-MSR Ad-Hoc minutes | Huawei | - |
R4‑123624 | Introduction of Band 28 into TS36.101 | NTT DOCOMO | - |
R4‑123625 | Way forward on Co-existence below 698MHz | NTT Docomo | - |
R4‑123626 | UL power control for E-UTRA MR BS | Huawei, CATT | - |
R4‑123627 | TP on Output power for MR BS | Huawei | - |
R4‑123628 | Proposal for E-UTRA Medium-Range and MSR Receiver Intermodulation Requirement | Nokia Siemens Networks, Ericsson, Alcatel Lucent, ZTE | - |
R4‑123629 | Way forward for LTE TRP and TRS test method development | Nokia Corporation | - |
R4‑123630 | 900 MHz UE coexistence in Korea | Qualcomm Incorporated | - |
R4‑123631 | TP for TR 37.804 Study of E-UTRA specific issues | KT | - |
R4‑123632 | TR for UMTS/LTE in 900 MHz band 37.804 v0.5.0 | NTT Docomo | - |
R4‑123633 | Way forward on UMTS/LTE in 900 MHz band | NTT Docomo | - |
R4‑123634 | TP on Mechanism for PIM generation | Ericsson | - |
R4‑123635 | TP on PIM scenarios | Ericsson | - |
R4‑123636 | TP for BS PIM scenarios | Huawei | - |
R4‑123637 | TP for RAN4 co-existence study | CATT | - |
R4‑123638 | Framework document for advanced receivers work item | Renesas Mobile Europe Ltd | - |
R4‑123639 | Advanced receivers simulation assumptions | Renesas Mobile Europe Ltd | - |
R4‑123640 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | - |
R4‑123641 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | - |
R4‑123642 | UL Transmit Timing Requirements | Renesas Mobile Europe Ltd., Motorola Mobility, Intel, Fujitsu, Research in Motion, NEC | - |
R4‑123643 | Some clarifications and OCNG pattern for eICIC demodulation requirements | Huawei,HiSilicon | - |
R4‑123644 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123645 | Phase IIbis eICIC FDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123646 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123647 | Phase IIbis eICIC TDD absolute and relative RSRP accuracy with MBSFN ABS | Ericsson, ST-Ericsson, Alcatel-Lucent | - |
R4‑123648 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel10 | LG Electronics | - |
R4‑123649 | CR on TDD RSRQ test case under Time Domain Measurement Resource Restriction with MBSFN ABS Rel11 | LG Electronics | - |
R4‑123650 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | - |
R4‑123651 | Intra-Frequency FDD RSRQ Accuracy under Time Domain Measurement Resource Restriction with MBSFN ABS | ZTE | - |
R4‑123652 | Target SNR setting for eICIC demodulation requirement | Ericsson, ST Ericsson | - |
R4‑123653 | Extension of static eICIC CQI test | Qualcomm | - |
R4‑123654 | Introduction of PDCCH test with colliding RS on MBSFN-ABS | Huawei,HiSilicon | - |
R4‑123655 | SNR reference values for FDD CA soft buffer tests | Intel | - |
R4‑123656 | LS on the SNR definition for UE performance tests and CSI tests | Huawei | - |
R4‑123657 | Text Proposal on Multiple Timing Advances and Random Access of the SCell | Alcatel-Lucent | - |
R4‑123658 | WF on feICIC system level simulations | Huawei | - |
R4‑123659 | LS on TP for co-existence study of FS_LTE_TDD_eIMTA | CATT | - |
R4‑123660 | Way forward for DC-HSUPA test | ST-Ericsson, Ericsson, Qualcomm | - |
R4‑123661 | LS on LTE TRP TRS test methodology and corresponding procedure in CTIA | Vodafone | - |
R4‑123662 | Introduction of Band 44 | Ericsson, ST-Ericsson | - |
R4‑123663 | RAN4 UE RF Ad-Hoc minutes | Petri | - |
R4‑123664 | [DRAFT] LS on 1CC transmission scheme for uplink inter-band carrier aggregation | NTT DOCOMO | - |
R4‑123665 | Introduction of 8C-HSDPA operation in 25.101 and rx core requirements | Ericsson, ST-Ericsson | - |
R4‑123666 | TP of medium range BS reference sensitivity | ZTE | - |
R4‑123667 | Way forward for E-UTRA MR BS reference sensitivity and blocking | Ericsson, Nokia Siemens Networks, Alcatel-Lucent, | - |
R4‑123668 | Introduction of e850_LB (Band 27) to TS 36.104 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123669 | Introduction of e850_LB (Band 27) to TS 36.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123670 | Introduction of e850_LB (Band 27) to TS 37.104 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123671 | Introduction of e850_LB (Band 27) to TS 37.141 | NII Holdings, Huawei, Nokia Siemens Networks | - |
R4‑123672 | Reply LS on Measurement Method for Rx Diversity | CATR | - |
R4‑123673 | Draft LS on for how to do TDD MB-MSR | CATT | - |
R4‑123674 | TP for 36.820: APAC700 UE emissions towards DTV | Ericsson, ST-Ericsson | - |
R4‑123675 | LS Response to Physical Layer Measurement for network positioning | TruePosition | - |
R4‑123676 | WF on simulation assumptions on geographically separated antennas | Qualcomm | - |
R4‑123677 | Introduction of Band 44 | Ericsson, ST-Ericsson | - |
R4‑123678 | Booked for RRM Session | - | - |
R4‑123679 | Booked for RRM Session | - | - |
R4‑123680 | Booked for RRM Session | - | - |
R4‑123681 | Booked for RRM Session | - | - |
R4‑123682 | Booked for RRM Session | - | - |
R4‑123683 | Booked for RRM Session | - | - |
R4‑123684 | Booked for RRM Session | - | - |
R4‑123685 | Booked for RRM Session | - | - |
R4‑123686 | Booked for RRM Session | - | - |
R4‑123687 | Booked for RRM Session | - | - |
R4‑123688 | Booked for RRM Session | - | - |
R4‑123689 | Booked for RRM Session | - | - |
R4‑123690 | Booked for RRM Session | - | - |
R4‑123691 | Booked for RRM Session | - | - |
R4‑123692 | Booked for RRM Session | - | - |
R4‑123693 | Booked for RRM Session | - | - |
R4‑123694 | Booked for RRM Session | - | - |
R4‑123695 | Booked for RRM Session | - | - |
R4‑123696 | Introduction of Band 44 | Ericsson, ST-Ericsson | - |
R4‑123697 | TR 36.820 v 0.7.0 | Ericsson, ST-Ericsson | - |
R4‑123698 | TP on PIM scenarios | Ericsson | - |
page generated from database: 2024-07-20 12:15:34