The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: GP-32 - 2006-11-13 to 2006-11-17, Sophia Antipolis

meeting id: GP-32 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
GP‑061926 - - -
GP‑061927 - - -
GP‑061928 - - -
GP‑061929 - - Approved
GP‑061930 70.8.2, 70.8.5.2 Incorrect references to SACCH - Agreed
GP‑061931 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Revised
GP‑061932 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061933 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061934 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061935 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061936 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061937 26.16.x PICS/PIXIT clean-up - Agreed
GP‑061938 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061939 26.17.x, 26.18.x, 26.19.x PICS/PIXIT clean-up - Agreed
GP‑061940 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑061941 26.19.x, incorrect PICS for AMR WB - Agreed
GP‑061942 section 47, PICS/PIXIT clean up - Agreed
GP‑061943 section 57, PICS/PIXIT clean up - Agreed
GP‑061944 - - Revised
GP‑061945 - - Revised
GP‑061946 PICS/PIXIT clean up - Agreed
GP‑061947 - - Revised
GP‑061948 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Withdrawn
GP‑061949 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Agreed
GP‑061950 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Revised
GP‑061951 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Agreed
GP‑061952 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Agreed
GP‑061953 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Agreed
GP‑061954 -If the MS was provisioned with an IP address of the GANC-SEGW, (or received it in the GA-RC DISCOVERY ACCEPT OR GA-RC REGISTER REDIRECT message), then the certificate shall contain an IPaddress SubjectAltName that matches that address. The MS may in Ericsson Withdrawn
GP‑061955 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Withdrawn
GP‑061956 - - Revised
GP‑061957 81.1.3.3, clarification on IP Sec tunnel - Withdrawn
GP‑061958 -If the MS was provisioned with an IP address of the GANC-SEGW, (or received it in the GA-RC DISCOVERY ACCEPT OR GA-RC REGISTER REDIRECT message), then the certificate shall contain an IPaddress SubjectAltName that matches that address. The MS may in Ericsson Agreed
GP‑061959 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Agreed
GP‑061960 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Withdrawn
GP‑061961 Max Response Time defined for A-GPS Minimum Performance requirements Spirent Communications // G1 -
GP‑061962 Clarifications to A-GPS Minimum Performance requirements Spirent Communications // G1 -
GP‑061963 Test methodology for A-GPS Minimum Performance Test Cases Spirent Communications Noted
GP‑061964 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Spirent Communications Agreed
GP‑061965 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Spirent Communications Revised
GP‑061966 - - Revised
GP‑061967 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Spirent Communications Agreed
GP‑061968 - - Revised
GP‑061969 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Spirent Communications Revised
GP‑061970 Statistical requirements for A-GPS Minimum Performance Test Cases - Agreed
GP‑061971 - - Revised
GP‑061972 Correction to the title of the section of 81.3.2.1. - Agreed
GP‑061973 - - Revised
GP‑061974 46.1.2.7.6 - Correction to the expiry time of I+S frame - Agreed
GP‑061975 - - Revised
GP‑061976 - - Revised
GP‑061977 - - Revised
GP‑061978 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Agreed
GP‑061979 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Revised
GP‑061980 46.x – Removal of the check on the number of octets sent - Agreed
GP‑061981 - - Revised
GP‑061982 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Revised
GP‑061983 - - Revised
GP‑061984 Update of Apllicability for some GPRS tests with a CS call - Agreed
GP‑061985 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Revised
GP‑061986 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Withdrawn
GP‑061987 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Agreed
GP‑061988 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. CGC Revised
GP‑061989 - - Revised
GP‑061990 - - Revised
GP‑061991 Reply LS on co-ordination of work on GERAN-LTE Interworking. TSG RAN -
GP‑061992 LS on Workshop organization on LTE GSM Handovers TSG SA -
GP‑061993 LS on 3GPP SAE<E Workplan SA Noted
GP‑061994 - Nokia -
GP‑061995 - Nokia -
GP‑061996 - - -
GP‑061997 - - -
GP‑061998 LS on no inclusion of ASI in 3GPP TS 29.060 already from Rel-6 SA2 -
GP‑061999 LS on “Normative specification work for Direct Tunnel solution” SA2 -
GP‑062000 - - Revised
GP‑062001 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. MCC272 Agreed
GP‑062002 [H11] Enter the source of the CR. This is either (a) one or several companies or, (b) if a (sub)working group has already reviewed and agreed the CR, then list the group as the source. MCC272 Agreed
GP‑062003 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. MCC272 Agreed
GP‑062004 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. MCC272 Agreed
GP‑062005 PICS/PIXIT and Band Dependency modifications in 30.x - Agreed
GP‑062006 PICS/PIXIT and Band Dependency modifications in 32.x - Agreed
GP‑062007 - - Revised
GP‑062008 - - Revised
GP‑062009 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Agreed
GP‑062010 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Revised
GP‑062011 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Revised
GP‑062012 47.3.4.1: Removal of step 20, 21 and 24 from the expected sequence - Agreed
GP‑062013 40.x - Serving cell ARFCN shall not be included in the neighbour cell list. - Withdrawn
GP‑062014 42.4.8.4.x - Serving cell ARFCN shall not be included in the neighbour cell list. - Withdrawn
GP‑062015 Section 40 - Rel-6 network simulation - Withdrawn
GP‑062016 s00-s10 – Provide missing and correct incomplete statements on Frequency Bands - Agreed
GP‑062017 17 – Remove redundant references to Frequency Bands - Withdrawn
GP‑062018 27 - PICS/PIXIT rationalisation - Agreed
GP‑062019 28 - PICS/PIXIT rationalisation - Agreed
GP‑062020 29 - PICS/PIXIT rationalisation - Agreed
GP‑062021 - - Revised
GP‑062022 Section 14: PICS/PIXIT Clean-Up - Agreed
GP‑062023 - - Revised
GP‑062024 Sections 21-25: PICS/PIXIT Clean-Up - Agreed
GP‑062025 - - Revised
GP‑062026 - - Revised
GP‑062027 - - Revised
GP‑062028 - - Revised
GP‑062029 Introduction of performance requirements for DARP phase II (MSRD) Ericsson, Freescale, Motorola, Nokia, Philips, RIM // -
GP‑062030 Introduction of Downlink Advanced Receiver Performance – phase II capability. Nokia // -
GP‑062031 - WI Rapporteur -
GP‑062032 26.10.2.4.1 – Invalid hopping frequency allocation for target cell - Agreed
GP‑062033 - - Revised
GP‑062034 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062035 26.16.10.1 and 2 – The channel mode modify procedure is not checked correctly - Withdrawn
GP‑062036 26.17.10 - The channel mode modify procedure is not checked correctly - Withdrawn
GP‑062037 26.19.10 - The channel mode modify procedure is not checked correctly - Withdrawn
GP‑062038 34.2.2 – Handling of retransmitted messages - Withdrawn
GP‑062039 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062040 42.3.1.1.9 – Cell allocation in GSM850, GSM700 and T-GSM810 band reduced from 17 to 16 frequencies - Withdrawn
GP‑062041 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062042 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Withdrawn
GP‑062043 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Withdrawn
GP‑062044 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062045 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062046 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062047 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062048 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Revised
GP‑062049 - - Revised
GP‑062050 Removal of not allowed characters used in mnemonics - Agreed
GP‑062051 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. setcom Withdrawn
GP‑062052 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. CGC Revised
GP‑062053 44.2.1.2.2: Corrected PICS statement: Automatic MM IMSI attach procedure at switch-on/power-on. - Withdrawn
GP‑062054 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. setcom Agreed
GP‑062055 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. setcom Revised
GP‑062056 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Setcom Revised
GP‑062057 Comments on the relaxation of some of the GSM radio requirements proposal Nortel Networks -
GP‑062058 - - Revised
GP‑062059 27 - PICS/PIXIT rationalisation - Agreed
GP‑062060 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Anite Agreed
GP‑062061 - - Revised
GP‑062062 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Motorola Agreed
GP‑062063 Discussion paper: GAN certificate requirements Aeroflex Noted
GP‑062064 GAN cell selection : Alignment with stage 3 Alcatel // G1 -
GP‑062065 Proposed Way Forward on GNSS support in GERAN in Rel-7 and beyond Ericsson, QUALCOMM Europe -
GP‑062066 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Nokia Revised
GP‑062067 81.3.2.2 - Correction to content of the test procedure - Agreed
GP‑062068 - - Revised
GP‑062069 - - Revised
GP‑062070 Requirement for Mandatory Response Time element in Measure Position Request Spirent Communications -
GP‑062071 Addition of Mandatory Response Time element in Measure Position Request Spirent Communications // G2 -
GP‑062072 The default value of HCS_THR LG Electronics, Nokia // G1 -
GP‑062073 The unit of HCS_THR LG Electronics, Nokia // G2 -
GP‑062074 Random access failure at the expiry of T3170 in case of packet measurement report LG Electronics // G2 -
GP‑062075 Addition of Reset MS Positioning Stored Information command Spirent Communications // G2 -
GP‑062076 - - -
GP‑062077 Flexible timeslot assignment Siemens // G1 -
GP‑062078 Flexible Timeslot Assignment Siemens // G2 -
GP‑062079 Flexible Timeslot Assignment support indication Siemens // CT1 -
GP‑062080 [DRAFT] LS on Flexible Timeslot Assignment support indication GERAN -
GP‑062081 The report on MEAN_BEP and CV_BEP in packet transfer mode LG Electronics // G1 -
GP‑062082 - - -
GP‑062083 Removal of inconsistencies in the BTS intermodulation and blocking requirements. Alcatel // -
GP‑062084 Removal of inconsistencies in the BTS intermodulation and blocking requirements. Alcatel // -
GP‑062085 Discussion paper: Inconsistent Numbering of Test Cases Anite Noted
GP‑062086 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Anite Withdrawn
GP‑062087 - - Noted
GP‑062088 LS on SIM/ICC Test Case Redundancy in Dual Mode (GERAN/UTRAN) CT6 Noted
GP‑062089 Reply LS on 3GPP SAE<E workplan CT6 -
GP‑062090 - - -
GP‑062091 - - -
GP‑062092 - - -
GP‑062093 - - -
GP‑062094 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Sasken Revised
GP‑062095 TC_42_1_2_1_18- Clarification to PSI2_CHANGE_MARK used. - Agreed
GP‑062096 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Sasken Agreed
GP‑062097 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Sasken Agreed
GP‑062098 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Sasken Revised
GP‑062099 Introduction of the MBMS Session Update procedure Telecom Italia S.p.A. // G1 -
GP‑062100 CR 43.064-0047 dual downlink carrier multislot class support for DTM Panasonic // -
GP‑062101 - - -
GP‑062102 - - -
GP‑062103 - - -
GP‑062104 Invalid characters in mnemonics - Agreed
GP‑062105 Combining of the (E)GPRS Uplink data blocks from one user with the speech pauses periods from another user(s) Motorola -
GP‑062106 Introduction of Downlink Dual Carrier Siemens, Panasonic // G1 -
GP‑062107 Downlink Dual carrier multislot class indication Siemens, Panasonic // G1 -
GP‑062108 [DRAFT] LS on Downlink Dual Carrier multislot capability indication GERAN -
GP‑062109 - - -
GP‑062110 Ciphering Mode Setting Support in DTM Assignment Command CT1 -
GP‑062111 LS on Common reference for the MBMS Session Repetition Number parameter CT3 -
GP‑062112 Reply LS on 3GPP SAE & LTE Work Plan SA5 -
GP‑062113 Introduction of Reduced TTI Ericsson // G1 -
GP‑062114 Introduction of CAMEL Trigger Points Ericsson // G1 -
GP‑062115 Various updates to TS 43.129 Ericsson // G1 -
GP‑062116 Clarification of PS Handover Cancel behaviour Ericsson // G1 -
GP‑062117 Improved behaviour in case of inactive PFCs/RABs Ericsson // G1 -
GP‑062118 PS Handover Support for GAN Ericsson // G1 -
GP‑062119 PS Handover Support for GAN Ericsson // G1 -
GP‑062120 - - -
GP‑062121 - - -
GP‑062122 - - -
GP‑062123 - - -
GP‑062124 - - -
GP‑062125 - - -
GP‑062126 Multislot capabilities for dual carrier mobiles Ericsson // G1 -
GP‑062127 Removal of dependencies between uplink and downlink dual carrier configurations Ericsson // G1 -
GP‑062128 - Samsung -
GP‑062129 - Nokia -
GP‑062130 - Nokia -
GP‑062131 - - -
GP‑062132 Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE Telecom Italia S.p.A. // G2 -
GP‑062133 Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE Telecom Italia S.p.A. // G2 -
GP‑062134 Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE Telecom Italia S.p.A. // G2 -
GP‑062135 Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE Telecom Italia S.p.A. // G2 -
GP‑062136 Correction to the MBMS Session Repetition Number IE Telecom Italia S.p.A. // G2 -
GP‑062137 Correction to the MBMS Session Repetition Number IE Telecom Italia S.p.A. // G2 -
GP‑062138 Correction to the name of the MBMS In-band Signalling Indicator IE in the CSN.1 coding in the MBMS NEIGHBOURING CELL INFORMATION message Telecom Italia S.p.A. // G2 -
GP‑062139 Clarification of the procedure at the expiry of T3186/T3170 on MPRACH Telecom Italia S.p.A. // G2 -
GP‑062140 Inter-RAT DTM Handover. Nokia // G2 -
GP‑062141 Impossible requirement for inclusion of IMSI in RA-CAPABILITY-UPDATE-ACK PDU Ericsson // G2 -
GP‑062142 NPM Transfer Time in MBMS data channel report Siemens // G2 -
GP‑062143 NPM Transfer Time in MBMS data channel report Siemens // G2 -
GP‑062144 Correction to the MBMS Session Start procedure Telecom Italia S.p.A. // G2 -
GP‑062145 Correction to the MBMS Session Start procedure Telecom Italia S.p.A. // G2 -
GP‑062146 Alignment to General Protocol Error Handling for RIM Ericsson // G2 -
GP‑062147 Alignment to General Protocol Error Handling for RIM Ericsson // G2 -
GP‑062148 Alignment to General Protocol Error Handling for RIM Ericsson // G2 -
GP‑062149 HCS in PSI3 LG Electronics // G2 -
GP‑062150 Introduction of RLC Non-persistent mode Siemens // G2 -
GP‑062151 Clarification of DA, EDA and shifted USF operation Siemens Networks // G2 -
GP‑062152 Clarification of DA, EDA and shifted USF operation Siemens Networks // G2 -
GP‑062153 Mobile Allocation in IMMEDIATE ASSIGNMENT message LG Electronics // G2 -
GP‑062154 Introduction of the MBMS Session Update procedure Telecom Italia S.p.A. // G2 -
GP‑062155 Introduction of the MBMS Session Update procedure Telecom Italia S.p.A. // G2 -
GP‑062156 Introduction of the MBMS Session Update procedure Telecom Italia S.p.A. // G2 -
GP‑062157 Abnormal conditions related to load sharing function for an IP sub-network Nortel Networks // G2 -
GP‑062158 Enhanced Power Control mode field information element in power command Research in Motion Limited // G2 -
GP‑062159 Cryptographic algorithm update Nokia // G2 -
GP‑062160 Cryptographic algorithm update Nokia // G2 -
GP‑062161 Timer Handling for GAN Nokia, Ericsson // G2 -
GP‑062162 Timer Handling for GAN Nokia, Ericsson // G2 -
GP‑062163 PDUs and messages references cleanup Nortel Networks // G2 -
GP‑062164 MBMS In-band Signalling Indicator in MBMS data channel report Siemens // G2 -
GP‑062165 MBMS In-band Signalling Indicator in MBMS data channel report Siemens // G2 -
GP‑062166 Correction of PS Handover to UTRAN procedure and message Siemens Networks // G2 -
GP‑062167 Correction of PS Handover to UTRAN procedure and message Siemens Networks // G2 -
GP‑062168 Inter-RAT DTM Handover Nokia // G2 -
GP‑062169 Correction of DTM Handover Command for inter-RAT Handover Siemens Networks // G2 -
GP‑062170 A-If link sharing cell re-establishment Nortel Networks, Siemens Networks // G2 -
GP‑062171 Enhanced Power Control mode field information element in power command Research in Motion Limited // G2 -
GP‑062172 Clarication of SGSN behaviour in PS Handover Cancel procedure Siemens Networks // G2 -
GP‑062173 Clarication of SGSN behaviour in PS Handover Cancel procedure Siemens Networks // G2 -
GP‑062174 - - -
GP‑062175 - Siemens Networks -
GP‑062176 - - -
GP‑062177 - - -
GP‑062178 A-GNSS, Status and a Way Forward Nokia, Siemens Networks, Motorola, Global Locate -
GP‑062179 Option B_rev1: Open Items Covered Nokia -
GP‑062180 Background for CRs “Add GNSS as a New Positioning Method for Galileo” Siemens Networks, Nokia -
GP‑062181 Add GNSS Assistance Data as a New Positioning Method for Galileo Nokia, Siemens Networks // G2 -
GP‑062182 Add GNSS Assistance Data as a New Positioning Method for Galileo Nokia, Siemens Networks // G2 -
GP‑062183 Add GNSS Assistance Data as a New Positioning Method for Galileo Nokia, Siemens Networks // G2 -
GP‑062184 Add GNSS as a New Positioning Method for Galileo Nokia, Siemens Networks // G2 -
GP‑062185 A-GNSS support to RRLP Nokia, Siemens Networks, Motorola, Global Locate // G2 -
GP‑062186 Add GNSS Assistance Data as a New Positioning Method for Galileo Nokia, Siemens Networks // G2 -
GP‑062187 - - -
GP‑062188 - - -
GP‑062190 Definition of Lost MS Siemens Networks // G1 -
GP‑062191 Enhanced Layer 2 Multi-block Handover Command Signaling Motorola -
GP‑062192 Enhanced Layer 2 Multi-block Handover Command Signaling Motorola -
GP‑062193 - - -
GP‑062194 Additional system level performance of HOT Ericsson // G1 -
GP‑062195 Blind modulation detection performance for HOT Ericsson // G1 -
GP‑062196 Impact of using HOT on the BCCH carrier Ericsson // G1 -
GP‑062197 Multiplexing HOT with legacy MS Ericsson // G1 -
GP‑062198 Correction of 16QAM results with alternative transmit pulse shaping Ericsson // G1 -
GP‑062200 - - -
GP‑062201 - - -
GP‑062202 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. 7layers AG Agreed
GP‑062203 Background for CR set “Introduction of Assisted Galileo Capabilityas an Assisted GNSS into the GERAN” Ericsson, QUALCOMM Europe -
GP‑062204 Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN Ericsson, QUALCOMM Europe // G2 -
GP‑062205 Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN Ericsson, QUALCOMM Europe // G2 -
GP‑062206 Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN Ericsson, QUALCOMM Europe // G2 -
GP‑062207 Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN Ericsson, QUALCOMM Europe // G2 -
GP‑062208 Introduction of Assisted GALILEO capability as an Assisted GNSS into the GERAN Ericsson, QUALCOMM Europe // G2 -
GP‑062209 - - -
GP‑062210 Blind Modulation Detection performance for HOT Intel Corporation // G1 -
GP‑062212 - - -
GP‑062213 Updated new WID on higher order modulation and turbo coding (HOT) for downlink - -
GP‑062214 Updated new WID on higher order modulation and turbo coding (HOT) for downlink: Stage 2 - -
GP‑062215 Updated new WID on higher order modulation and turbo coding (HOT) for downlink: Stage 3 - -
GP‑062216 Updated new WID on higher order modulation and turbo coding (HOT) for downlink: MS conformance tests - -
GP‑062217 Updated new WID on higher order modulation and turbo coding (HOT) for downlink: BSS conformance tests - -
GP‑062218 Applicability for repeated ACCH performance requirements. Research In Motion // G2 -
GP‑062219 Release indication and additional discovery reject cause Research In Motion // G2 -
GP‑062220 Release indication and additional discovery reject cause Research In Motion // G2 -
GP‑062221 - - Revised
GP‑062222 Introduction of Downlink Dual Carrier - Assignment Messages Siemens // G2 -
GP‑062223 - Siemens -
GP‑062224 Addition of extension mechanism to PS HANDOVER COMMAND message Siemens // G2 -
GP‑062225 Introduction of Downlink Dual Carrier messages Siemens Networks // G2 -
GP‑062226 Introduction of Downlink Dual Carrier procedures Siemens Networks // G2 -
GP‑062227 - - -
GP‑062228 Sending SMS to the group call Siemens // G2 -
GP‑062229 Introduction of Downlink Dual Carrier - Procedures Siemens // G2 -
GP‑062230 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062231 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062232 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062233 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062234 Removal of duplicate cause value Nortel Networks // G2 -
GP‑062235 Removal of duplicate cause value Nortel Networks // G2 -
GP‑062236 - - -
GP‑062237 Usage of TLLI for BSSGP Nortel Networks // G2 -
GP‑062238 Clarification of the FLUSH-LL procedure Nortel Networks // G2 -
GP‑062239 - - -
GP‑062240 Possible Use of Extended Dynamic Allocation in Loopback Needed. Qualcomm Europe S.A.R.L., CETECOM S.A // G2 -
GP‑062241 - - -
GP‑062242 Correction on action at expiry of transmitter NPM timer Huawei // G2 -
GP‑062243 - - -
GP‑062244 Enhancement to the RLC Non-persistent mode Huawei // G2 -
GP‑062245 Correction on GANC action of Registration Update procedure Huawei // G2 -
GP‑062246 Missing Cell discriminators for Cell Identifier List Segment Huawei // G2 -
GP‑062247 Clarification of delete PFC behaviour Huawei // G2 -
GP‑062248 Clarification of delete PFC behaviour Huawei // G2 -
GP‑062249 Preparation for future additions to the PS Handover Command message Ericsson // G2 -
GP‑062250 Active PFCs in PS Handover Required Ericsson // G2 -
GP‑062251 Active PFCs in PS Handover Required Ericsson // G2 -
GP‑062252 Cause value for CS interaction Ericsson // G2 -
GP‑062253 Cause value for CS interaction Ericsson // G2 -
GP‑062254 Inclusion of Dual Carrier in Downlink Ericsson // G2 -
GP‑062255 - - -
GP‑062256 - - -
GP‑062258 PS Handover for GAN Ericsson // GERAN WG2 -
GP‑062259 PS Handover for GAN Ericsson // G2 -
GP‑062260 PS Handover Support for GAN Ericsson // G2 -
GP‑062261 Introduction of NPM Transfer Time Siemens Networks // G1 -
GP‑062262 Introduction of NPM Transfer Time Siemens Networks // G1 -
GP‑062263 Clarification on the PS HO execution phase Siemens Networks // G1 -
GP‑062264 Introduction RLC non-persistent mode Siemens Networks // G1 -
GP‑062265 Decoupling support of mTBF and RLC non-persistent mode Siemens Networks // G2 -
GP‑062266 - Siemens -
GP‑062267 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062268 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062269 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062270 GAN 3G Early Classmark correction Nokia // G2 -
GP‑062271 GAN 3G Early Classmark correction Nokia // G2 -
GP‑062272 Cryptographic algorithm update Nokia // G1 -
GP‑062273 Multiple TBF Capability description Nokia // G2 -
GP‑062274 Multiple TBF Capability description Nokia // G2 -
GP‑062275 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Anite Revised
GP‑062276 - - -
GP‑062277 Bit efficient support of extended orbit for GNSS QUALCOMM Europe -
GP‑062278 - - Noted
GP‑062279 - - Noted
GP‑062280 Enhanced Layer 2 Multi-block Handover Command Signaling Motorola -
GP‑062281 - Nokia -
GP‑062282 - - -
GP‑062283 New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink - -
GP‑062284 New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – Stage 2 - -
GP‑062285 New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – Stage 3 - -
GP‑062286 New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – MS conformance tests - -
GP‑062287 New WID on Modulation Order and symbol Rate Enhancement (MORE) for downlink – BSS conformance tests - -
GP‑062288 Addition of MORE to chapter 8 on higher order modulations and turbo codes Siemens // G1 -
GP‑062290 - - -
GP‑062291 - - Noted
GP‑062292 Reply LS on 3GPP SAE & LTE Work Plan SA5 -
GP‑062293 LS on "protected MBMS services over MBMS broadcast" SA3 -
GP‑062294 LS on Proposed Mapping between BSSGP and RANAP cause values for PS HO CT4 -
GP‑062295 LS on on Workshop organization on LTE GSM Handovers 3GPP SA WG1 -
GP‑062296 GAN Enhancements 3GPP TSG SA WG1 -
GP‑062297 LS on UE Performance related to cell/PLMN reselection TSG RAN WG2 -
GP‑062298 - - -
GP‑062299 Combining of the (E)GPRS Uplink data blocks from one user with the speech pauses periods from another user(s) Motorola, Freescale -
GP‑062300 Introduction of Downlink Dual Carrier Siemens, Panasonic // G1 -
GP‑062301 PICS/PIXIT Cleaning for GPRS section 44 - Agreed
GP‑062302 PICS/PIXIT Cleaning for GPRS section 45 - Agreed
GP‑062303 PICS/PIXIT Cleaning for GPRS section 46 - Agreed
GP‑062304 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Agreed
GP‑062305 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Agreed
GP‑062306 - - Noted
GP‑062307 PICS/PIXIT and Band Dependency modifications in 33.x - Agreed
GP‑062308 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Aeroflex Agreed
GP‑062309 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. 7layers AG Revised
GP‑062310 13.3, 13.16.2, 13.17.3 - Clarification of required output levels in Transmitter output power test cases - Withdrawn
GP‑062311 Sections 80-90: PICS/PIXIT Clean-Up - Agreed
GP‑062312 Sections 15-20: PICS/PIXIT Clean-Up - Agreed
GP‑062313 - - Revised
GP‑062314 29 - PICS/PIXIT rationalisation - Withdrawn
GP‑062315 13.16.2, 13.17.3 – PICS cleanup - Withdrawn
GP‑062316 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. CGC Revised
GP‑062317 - - Revised
GP‑062318 section 60, PICS/PIXIT clean up - Agreed
GP‑062319 section 70, PICS/PIXIT clean up - Agreed
GP‑062320 PICS/PIXIT and Band Dependency modifications in 34.x - Agreed
GP‑062321 PICS Cleaning for GPRS section 44 in table B1 - Agreed
GP‑062322 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Agreed
GP‑062323 TCs 80-90: PICS/PIXIT Clean-Up - Agreed
GP‑062324 Response to PTCRB LS on Cell Bar Qualify TSG GERAN WG3 Agreed
GP‑062325 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Sasken Agreed
GP‑062326 LS on Test Case Redundancy in Dual Mode (GERAN/UTRAN) GERAN3 Agreed
GP‑062327 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062328 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062329 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062330 Introduction of GEA2 and GEA3 encryption - Agreed
GP‑062331 PICS Cleaning for GPRS section 46 in table B1 - Agreed
GP‑062332 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062333 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062334 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062335 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Sasken Agreed
GP‑062336 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Agreed
GP‑062337 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. RIM Agreed
GP‑062338 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Ericsson Agreed
GP‑062339 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Setcom Agreed
GP‑062340 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Setcom Agreed
GP‑062341 Sections 11-13: PICS/PIXIT Clean-Up - Agreed
GP‑062342 - - Agreed
GP‑062343 - - Agreed
GP‑062344 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Nokia Agreed
GP‑062345 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Agreed
GP‑062346 26.6.3.9 – Corrections to cell configurations and specific message contents - Agreed
GP‑062347 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Rohde & Schwarz Agreed
GP‑062348 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. setcom Agreed
GP‑062349 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Spirent Communications Agreed
GP‑062350 GPS Scenarios and Assistance Data for A-GPS Minimum Performance Test Cases - Agreed
GP‑062351 A-If link sharing cell re-establishment Nortel Networks, Siemens Networks // G2 -
GP‑062352 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062353 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062354 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062355 Introduction of NPM Transfer Time Siemens Networks // G1 -
GP‑062356 Introduction of NPM Transfer Time Siemens Networks // G1 -
GP‑062357 GAN cell selection : Alignment with stage 3 Alcatel // G1 -
GP‑062358 Reply LS on “Normative specification work for Direct Tunnel solution” RAN3 -
GP‑062359 LS on Answer on proposed mapping between BSSGP and RANAP cause values for PS Handover RAN3 -
GP‑062360 LS on Directed Retry based on PS Handover and DTM Handover RAN3 -
GP‑062361 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062362 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062363 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062364 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062365 Clarification of PS Handover Cancel behaviour Ericsson // G1 -
GP‑062366 Improved behaviour in case of inactive PFCs/RABs Ericsson // G1 -
GP‑062367 Active PFCs in PS Handover Required Ericsson // G2 -
GP‑062368 Active PFCs in PS Handover Required Ericsson // G2 -
GP‑062369 Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE Telecom Italia S.p.A. // G2 -
GP‑062370 Correction to the inclusion of the NPM Transfer Time IE in the MBMS Channel Parameters IE Telecom Italia S.p.A. // G2 -
GP‑062371 Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE Telecom Italia S.p.A. // G2 -
GP‑062372 Correction for the inclusion of the NPM Transfer Time IE in the MBMS Session Parameters List IE Telecom Italia S.p.A. // G2 -
GP‑062373 Clarification on the PS HO execution phase Siemens Networks // G1 -
GP‑062374 Preparation for future additions to the PS Handover Command message Ericsson, Siemens Networks // G2 -
GP‑062375 Cause value for CS interaction Ericsson // G2 -
GP‑062376 Cause value for CS interaction Ericsson // G2 -
GP‑062377 Multiple TBF Capability description Nokia // G2 -
GP‑062378 Multiple TBF Capability description Nokia // G2 -
GP‑062379 Sending SMS to the group call Siemens // G2 -
GP‑062380 Introduction of new cause values for PS Handover Nortel Networks // G2 -
GP‑062381 The report on MEAN_BEP and CV_BEP in packet transfer mode LG Electronics // G1 -
GP‑062382 Flexible timeslot assignment Siemens Networks // G1 -
GP‑062383 Blind Modulation Detection performance for HOT Marvell Semiconductor // G1 -
GP‑062384 Addition of MORE to chapter 8 on higher order modulations and turbo codes Siemens // G1 -
GP‑062385 Correction of 16QAM results with alternative transmit pulse shaping Ericsson // G1 -
GP‑062386 LS on Introduction of CAMEL Trigger Points for PS handover 3GPP TSG GERAN WG2 -
GP‑062387 Downlink Dual carrier multislot class indication Siemens, Panasonic // G1 -
GP‑062388 CR 43.064-0047 dual downlink carrier multislot class support for DTM Panasonic // WG1 -
GP‑062389 Introduction of Downlink Dual Carrier Siemens, Panasonic // G1 -
GP‑062390 Downlink Dual carrier multislot class indication Siemens, Panasonic // G1 -
GP‑062391 Introduction of new cause values for PS Handover Nortel Networks // G2 -
GP‑062392 LS on Downlink Dual Carrier multislot capability indication TSG GERAN -
GP‑062393 Introduction of Downlink Dual Carrier messages Siemens Networks // G2 -
GP‑062394 Introduction of Downlink Dual Carrier - Assignment Messages Siemens Networks, Ericsson // G2 -
GP‑062395 Introduction of Reduced TTI Ericsson // G1 -
GP‑062396 Introduction RLC non-persistent mode Siemens Networks // G1 -
GP‑062397 Correction on action at expiry of transmitter NPM timer Huawei // G2 -
GP‑062398 PS Handover Support for GAN Ericsson // G1 -
GP‑062401 CS Handover Support for GAN Nokia // -
GP‑062402 Flexible Timeslot Assignment Siemens // G2 -
GP‑062403 Flexible Timeslot Assignment support indication Siemens // CT1 -
GP‑062404 Random access failure at the expiry of T3170 in case of packet measurement report LG Electronics // G2 -
GP‑062405 HCS in PSI3 LG Electronics, Nokia // G2 -
GP‑062406 Decoupling support of mTBF and RLC non-persistent mode Siemens Networks // G2 -
GP‑062407 A-GNSS support to RRLP Nokia, Siemens Networks // G2 -
GP‑062408 Add GNSS Assistance Data as a New Positioning Method for Galileo Nokia, Siemens Networks // G2 -
GP‑062409 LS on DARP Phase II support indication GERAN -
GP‑062410 Usage of TLLI for BSSGP Nortel Networks // G2 -
GP‑062411 Introduction of NPM Transfer Time Siemens Networks // G1 -
GP‑062412 Introduction of NPM Transfer Time Siemens Networks // G1 -
GP‑062413 Addition of Reset MS Positioning Stored Information command Spirent Communications // G2 -
GP‑062414 Response from the serving BSS when RIM application is disabled Nokia // G2 -
GP‑062415 Improved behaviour in case of inactive PFCs/RABs Ericsson // G1 -
GP‑062416 Active PFCs in PS Handover Required Ericsson // G2 -
GP‑062417 Active PFCs in PS Handover Required Ericsson // G2 -
GP‑062418 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062419 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062420 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062421 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Spirent Communications Agreed
GP‑062422 - - Revised
GP‑062423 Missing PICS for A-GPS - Agreed
GP‑062424 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. Wavecom Agreed
GP‑062425 2G/3G test case redundancy - Agreed
GP‑062426 Five Test Cases for A-GPS Minimum Performance Test Cases - Agreed
GP‑062427 Section 14: PICS/PIXIT Clean-Up - Agreed
GP‑062428 Sections 15-20: PICS/PIXIT Clean-Up - Agreed
GP‑062429 Sections 21-25: PICS/PIXIT Clean-Up - Agreed
GP‑062430 - - Noted
GP‑062431 - - Noted
GP‑062432 Work Plan on Clean-Up of PICS/PIXIT statements in 51.010-1 GERAN WG3 Noted
GP‑062433 One or more organizations (3GPP Individual Members) which drafted the CR and are presenting it to the Working Group. CGC Agreed
GP‑062434 Sections 11-13: PICS/PIXIT Clean-Up - Agreed
GP‑062435 Addition of PICS for new A-GPS Minimum Performance Test Cases - Agreed
GP‑062436 Reply LS on August 2006 RFT Activity – GERAN (NITZ) GERAN3 Agreed
GP‑062437 - - Noted
GP‑062438 LS on status of GERAN WG3 activity GERAN WG3 Agreed
GP‑062439 - - Noted
GP‑062440 - - -
GP‑062441 GP-061929Source GERAN WG3 Chairman: Draft Agenda for TSG GERAN WG3 during TSG GERAN no. 32 in Sophia Antipolis ource GERAN WG3 ChairmanTitle: Draft Agenda for TSG GERAN WG3 during TSG GERAN no. 32 in Sophia Antipolis -
GP‑062442 Introduction of Downlink Dual Carrier Siemens, Panasonic // G1 -
GP‑062443 LS on Downlink Dual Carrier multislot capability indication TSG GERAN -
GP‑062444 LS on Introduction of CAMEL Trigger Points for PS handover TSG GERAN, TSG GERAN WG1, TSG GERAN WG2 -
GP‑062445 - - -
GP‑062446 - - -
GP‑062447 Draft Report of TSG GERAN WG1 during TSG GERAN #32, version 0.0.1 Secretary TSG GERAN WG1, Paolo Usai -
GP‑062448 - - -
GP‑062449 Draft Report of TSG GERAN WG1 during TSG GERAN #32, version 0.0.2 Secretary TSG GERAN WG1, Paolo Usai -
GP‑062451 CR 43.064-0047 dual downlink carrier multislot class support for DTM Panasonic // WG1 -
GP‑062452 Introduction of performance requirements for DARP phase II (MSRD) Ericsson, Freescale, Motorola, Nokia, Philips, RIM // G1 -
GP‑062453 LS on DARP Phase II support indication GERAN -
GP‑062454 - - -
GP‑062455 The report on MEAN_BEP and CV_BEP in packet transfer mode LG Electronics // G1 -
GP‑062456 The report on MEAN_BEP and CV_BEP in packet transfer mode LG Electronics // G1 -
GP‑062457 Random access failure at the expiry of T3170 in case of packet measurement report LG Electronics // G2 -
GP‑062461 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062462 Introduction of new cause values for PS Handover Nortel Networks // G2 -
GP‑062463 Introduction of new cause values for PS Handover Nortel Networks // G2 -
GP‑062464 Multiple TBF Capability description Nokia // G2 -
GP‑062465 Multiple TBF Capability description Nokia // G2 -
GP‑062466 LS on Proposed Mapping between BSSGP and RANAP cause values for PS Handover TSG GERAN WG2 -
GP‑062467 Sending SMS to the group call Siemens // G2 -
GP‑062468 Introduction RLC non-persistent mode Siemens Networks // G1 -
GP‑062469 Correction on action at expiry of transmitter NPM timer Huawei // G2 -
GP‑062470 PS Handover Support for GAN Ericsson // G1 -
GP‑062471 Random access failure at the expiry of T3170 in case of packet measurement report LG Electronics // G2 -
GP‑062472 - - -
GP‑062474 - - -
GP‑062475 Introduction of Downlink Dual Carrier messages Siemens Networks // G2 -
GP‑062476 Introduction of Reduced TTI Ericsson // G1 -
GP‑062477 CS Handover Support for GAN Nokia // -
GP‑062478 GAN CS Handover and PS Handover Impacts on 3GPP TS 25.922 3GPP TSG GERAN WG2 -
GP‑062479 Introduction of Reduced TTI Ericsson // G1 -
GP‑062480 Introduction of Downlink Dual Carrier - Assignment Messages Siemens Networks, Ericsson // G2 -
GP‑062481 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062482 Non-critical PS handover reject Nortel Networks // G2 -
GP‑062483 Introduction of Reduced TTI Ericsson // G1 -
GP‑062484 GAN CS Handover and PS Handover Impacts on 3GPP TS 25.922 3GPP TSG GERAN WG2 -
GP‑062485 Random access failure at the expiry of T3170 in case of packet measurement report LG Electronics // G2 -
GP‑062486 - - -
GP‑062487 - - -
GP‑062488 New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink - -
GP‑062489 New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: Stage 2 - -
GP‑062490 New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: Stage 3 - -
GP‑062491 New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: MS conformance tests - -
GP‑062492 New WID on reduced symbol duration, higher order modulation and turbo coding (RED HOT) for downlink: BTS conformance tests - -

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links