SP‑130162 | Draft agenda for TSG SA meeting #60 | TSG SA Chairman | The draft agenda was reviewed and approved. |
SP‑130163 | Draft Report of TSG SA meeting #59 | TSG SA Secretary | The draft report was reviewed and approved. The revision marks will be accepted and the report placed on the FTP server as version 1.0.0. |
SP‑130164 | LS on TSG SA feedback to Annex 1 of Rec. ITU-R M.2012 | TSG SA | Approved. (e-mail approved before the meeting) |
SP‑130165 | LS from Broadband Forum: Performance Measurements Architecture | Broadband Forum | This was noted and will be forwarded to SA WG5. |
SP‑130166 | LS from ITU-T SG13: Request for information for the new draft Recommendation Q.1741.9 (referencing of 3GPP Release 11) | ITU-T SG13 | A list of relevant 3GPP Specifications was provided in SP-130290 which was reviewed. This was then noted. |
SP‑130167 | LS from TSG GERAN: Reply LS on requesting input on MTCe solutions | TSG GERAN | This LS was copied to TSG SA for information and was noted. |
SP‑130168 | LS from IEEE 802 OmniRAN SG: Interpretations of assumptions in chapter 16 of 3GPP TS 23.402 V11.6.0 (2013-03) on the behavior of a Trusted WLAN Access Network | IEEE 802 OmniRAN SG | This was also addressed to SA WG2 and should be handled by SA WG2 when they have conclusions on the SaMOG work. This was then noted. |
SP‑130169 | LS from Wi-Fi Alliance: Hotspot 2.0 Release 2 Draft Technical Specification | Wi-Fi Alliance | This was provided to TSG SA for information and was noted. |
SP‑130170 | LS from NGMN: Draft Liaison Statement from NGMN to GSMA, 3GPP, WFA and WBA | NGMN | NEC reported that TSG RAN had reviewed this and asked MCC to provide information to RAN WG2 in order to review the work. MCC were to also provide the information to SA WG2 to determine if there are any impacts on ongoing work or trigger new work. With thi |
SP‑130171 | LS from NGMN: Liaison Letter to 3GPP on Mobile Content Delivery Optimization | NGMN | This was reviewed and noted. |
SP‑130172 | LS from SA WG5: LS on completion of TS 28.390 Fixed Mobile Convergence (FMC) Interface IRP Solution Profiles (SPs) | SA WG5 | This was provided for information and was noted. |
SP‑130173 | LS from SA WG5: LS on IMS service level trace removal of feature from old releases | SA WG5 | The TSG CT Chairman reported that CT WG1 will consider removing this from Release 11 and inform SA WG5 of their decision, then SA WG5 can determine whether to remove it from their Rel-11 specifications. This was then noted. |
SP‑130174 | 3GPP Work Plan review at Plenary #60 | MCC Work Plan manager | The MCC coordinator was thanked for this report, which was noted. |
SP‑130175 | 3GPP Releases Descriptions - Rel-11 to Rel-13 | MCC Work Plan manager | The MCC coordinator was thanked for this summary, which was noted. |
SP‑130176 | Standardization of Machine-type Communications | MCC Work Plan manager | This was provided for information and was noted. |
SP‑130177 | LS from GSMA and WBA: Wi-Fi Roaming Task Force - Trusted WiFi and IP address preservation | GSMA and WBA | It was noted that the intention is to complete the SaMOG work in the Rel-12 timeframe and assuming decisions can be made in SA WG2 should be on target. This was then noted. |
SP‑130178 | LS from GSMA and WBA: Wi-Fi Roaming Task Force - Delivery of voice and real time services over Trusted Wi-Fi | GSMA and WBA | This should be considered by SA WG2 and discussed in thei SaMOG sessions. This was then noted. |
SP‑130179 | LS from Wi-Fi Roaming Task Force: Wi-Fi Roaming Task Force - Roaming impacts | Wi-Fi Roaming Task Force | This was provided for information and was noted. |
SP‑130180 | SA WG4 Status Report at TSG SA#60 | SA WG4 Chairman | The SA WG4 Chairman was thanked for this report, which was noted. |
SP‑130181 | CRs to TS 26.114 on 'Correction on ECN Capability Indication in the SDP (LTEimp-Vocoder)' (Release 9 until Release 12) | SA WG4 | Approved |
SP‑130182 | CRs to TS 26.237 on 'Clarification on File Repair Procedure in IMS-based MBMS Download Service (IMS_PSS_MBMS_US_EXT)' (Release 9 until Release 11) | SA WG4 | Approved |
SP‑130183 | CRs to TS 26.234 and TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 until Release 11) | SA WG4 | Approved |
SP‑130184 | CRs to TS 26.247 on 'HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10 and Release 11) | SA WG4 | A number of editorial and formatting errors were reported. MCC were asked to correct these editorial errors on implementation of the CRs. These CRs were then approved. |
SP‑130185 | CRs to TS 26.132 on 'Extensions of Acoustic Test Specifications (Ext_ATS)' (Release 11) | SA WG4 | Approved |
SP‑130186 | CR to TS 26.234 on 'Missing RDF schema identification (M3DV)' (Release 11) | SA WG4 | Approved |
SP‑130187 | CR to TS 26.346 on 'Confidentiality Protection of Associated Delivery Procedure Messages (TEI11)' (Release 11) | SA WG4 | Approved |
SP‑130188 | CRs to TS 26.114 and TS 26.234 on 'Co-ordination of Video Orientation (CVO)' (Release 12) | SA WG4 | Approved |
SP‑130189 | CRs to TS 26.131 and TS 26.132 on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE (ART_LTE)' (Release 12) | SA WG4 | Approved |
SP‑130190 | Revised Work Item Description on 'Enhanced MBMS Operation' (MI-EMO) (BB) | SA WG4 | This updated WID was approved. |
SP‑130191 | CRs to TS 26.114 on 'Technical Enhancements and Improvements Rel-12 (TEI12)' (Release 12) | SA WG4 | Approved |
SP‑130192 | TR 26.938 on 'Packet-Switched Streaming Service (PSS): Improved Support for Dynamic Adaptive Streaming over HTTP in 3GPP (Release 12)', v. 1.0.0 (FS_IS_DASH) | SA WG4 | This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG4. |
SP‑130193 | SA WG1 Report to TSG SA#60 | SA WG1 Chairman | The SA WG1 Chairman was thanked for this report, which was noted. |
SP‑130194 | Stage 1 CRs on TEI9 | SA WG1 | Approved |
SP‑130195 | Stage 1 CRs on TEI11 | SA WG1 | Approved |
SP‑130196 | Stage 1 CRs on TEI12 | SA WG1 | Approved |
SP‑130197 | Revised WID on Group Communication System Enablers for LTE (GCSE_LTE) | SA WG1 | The MCC Work Plan manager suggested adding the UID, outlined some corrections needed to the schedule and add the SA WG2 TR number. This was revised in SP-130326 |
SP‑130198 | Presentation of TS 22.468 on Group Communication System Enablers for LTE (GCSE_LTE) | SA WG1 | Noted. Proposed MCC revision in SP-130292 |
SP‑130199 | Stage 1 CRs on Proximity-based Services (ProSE) | SA WG1 | Revised in SP-130315 |
SP‑130200 | Stage 1 CRs on Web Real Time Communication Access to IMS (IMS_WebRTC) | SA WG1 | Approved |
SP‑130201 | New WID on RAN Sharing Enhancements (RSE) | SA WG1 | A proposed update to this WID was provided by NEC and MCC in SP-130283. This was then noted. |
SP‑130202 | Stage 1 CRs on Feasibility Study on Proximity-based Services (FS_ProSe) | SA WG1 | Revised in SP-130316 |
SP‑130203 | TR 22.852 on Feasibility Study on RAN Sharing Enhancements (FS_RSE) | SA WG1 | This TR was approved and placed under TSG SA change control (Release 12). |
SP‑130204 | New WID on Feasibility Study on Resilient E-UTRAN Operation for Public Safety (FS_REOPS) | SA WG1 | A proposed update to this WID was provided by NEC and MCC in SP-130240. This was then noted. |
SP‑130205 | MCC Support Team Report | MCC Support Team Coordinator | The MCC Support Team Coordinator was thanked for this report, which was noted. |
SP‑130206 | LS from CT WG1: Reply LS on UE's inconsistent behaviour when PS Back-off timer is running | CT WG1 | Noted. The related CRs (23.401 CR2522R2; 23.401 CR2523R1; 23.401 CR2524R1) were in SP-130212, which were reviewed. It was decided to return the CRs to SA WG2 and SA WG2 were asked to respond to the CT WG1 Liaison before reconsidering these CRs. This was t |
SP‑130207 | LS from RAN WG3: LS on information of progress in the SI on LTE-HRPD SON | RAN WG3 | This was reviewed and noted. |
SP‑130208 | TSG GERAN Status Report to TSG SA#60 | TSG GERAN Chairman | The TSG GERAN Chairman was thanked for this report, which was noted. |
SP‑130209 | Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)' | RAN ITU-R Ad-hoc | This was the input to the review in TSG RAN and was noted. |
SP‑130210 | SA WG2 Report to TSG SA#60 | SA WG2 Chairman | The SA WG2 Chairman was thanked for this report, which was noted. |
SP‑130211 | 3 CRs to 23.272 (IMS_EMER_GPRS_EPS - Rel-9, Rel-10, Rel-11) | SA WG2 | Approved |
SP‑130212 | 5 CRs to 23.272, 23.401 (NIMTC - Rel-10, Rel-11, Rel-12) | SA WG2 | 23.401 CR2522R2; 23.401 CR2523R1; 23.401 CR2524R1 were returned to SA WG2 for further consideration with the LS from CT WG1. 23.272 CR0878 and 23.272 CR0879R1 were approved. |
SP‑130213 | 8 CRs to 23.251, 23.237, 23.060 (TEI10 - Rel-10, Rel-11, Rel-12) | SA WG2 | Approved |
SP‑130214 | 2 CRs to 23.216 (eSRVCC - Rel-10, Rel-11) | SA WG2 | Approved |
SP‑130215 | 2 CRs to 23.228 (IPXS - Rel-11, Rel-12) | SA WG2 | Approved |
SP‑130216 | 10 CRs to 23.204, 23.002, 23.401, 23.272, 23.682 (SIMTC, SIMTC-Reach - Rel-11, Rel-12) | SA WG2 | Revised to remove erroneous CRs in SP-130305 |
SP‑130217 | 2 CRs to 23.203 (BBAI - Rel-11, Rel-12) | SA WG2 | Approved |
SP‑130218 | 6 CRs to 23.203, 23.228 (NWK-PL2IMS - Rel-11, Rel-12) | SA WG2 | Revised to remove erroneous CRs in SP-130306 |
SP‑130219 | 3 CRs to 23.002, 23.203 (SAPP - Rel-11, Rel-12) | SA WG2 | Revised to remove erroneous CRs in SP-130307 |
SP‑130220 | 2 CRs to 23.060 (SIRIG - Rel-11, Rel-12) | SA WG2 | Editorial corrections were needed and this was revised in SP-130319 |
SP‑130221 | 1 CR to 23.216 (rSRVCC - Rel-11) | SA WG2 | Approved |
SP‑130222 | 1 CR to 23.060 (TEI11 - Rel-11) | SA WG2 | Approved. NOTE: The Rel 12 mirror CR is provided by company contribution in SP-130242. |
SP‑130223 | 12 CRs to 23.221, 23.272, 23.203, 23.237, 23.292 (TEI11 - Rel-11, Rel-12) | SA WG2 | Editorial errors were reported which should be corrected by MCC. These CRs were then approved. |
SP‑130224 | 12 CRs to 23.167, 23.216, 23.272, 23.060 (TEI11, Earlier Rel WIs - Rel-11, Rel-12) | SA WG2 | Revised to remove erroneous CRs in SP-130309 |
SP‑130225 | 12 CRs to 23.060, 23.401, 23.402 (TEI11, Earlier Rel WIs - Rel-11, Rel-12) | SA WG2 | Approved |
SP‑130226 | 8 CRs to 23,002, 23.401, 23.060 (LIMONET - Rel-12) | SA WG2 | Revised to remove erroneous CRs in SP-130310 |
SP‑130227 | 1 CR to 23.402 (OPIIS - Rel-12) | SA WG2 | Approved |
SP‑130228 | 1 CR to 23.139 (P4C-TI - Rel-12) | SA WG2 | Approved |
SP‑130229 | 1 CR to 23.203 (UMONC - Rel-12) | SA WG2 | Approved |
SP‑130230 | 3 CRs to 23,002, 23.203 (ABC - Rel-12) | SA WG2 | The clauses affected were wrong in 23.203 CR0808R3, so this was revised into SP-130329. The remaining CRs in this pack were approved. |
SP‑130231 | 1 CR to 23.228 (BUSTI - Rel-12) | SA WG2 | SA WGs should review their specifications for references to external specifications to detrmine their ongoing relevance and need. TSG SA agreed that external references should be avaoided wherever possible in 3GPP specifications. This CR was then approved |
SP‑130232 | 11 CRs to 23.237, 23.060, 23.401, 23.236, 23.402 (TEI12 - Rel-12) | SA WG2 | Approved |
SP‑130233 | TR 23.839: Study on Support of BBF Access Interworking (Release 12) for approval (P4C-TI) | SA WG2 | This TR was approved and placed under TSG SA change control (Release 12). |
SP‑130234 | TR 23.887: Machine-Type and other Mobile Data Applications Communications Enhancements (Release 12) for information (MTCe) | SA WG2 | This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
SP‑130235 | TR 23.865: WLAN network selection for 3GPP terminals; Stage 2 (Release 12) for information (WLAN_NS) | SA WG2 | This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
SP‑130236 | TR 23.897: Feasibility study on IMS Business Trunking for IP-PBX in Static Mode of Operation (Release 12) for approval (BusTI) | SA WG2 | This TR was approved and placed under TSG SA change control (Release 12). |
SP‑130237 | TR 23.843: Study on Core Network Overload Solutions; (Release 12) for information (FS_CNO) | SA WG2 | This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
SP‑130238 | Revised WID for Web Real Time Communication (WebRTC) Access to IMS | SA WG2 | The MCC Work Plan manager commented that the UID could have been added and some additonal references to the ITU work, the relevant Stage information should be added and the the SA WG1 scheduled dates should be corrected. The specification manager provide |
SP‑130239 | Revised WID on Application Based Charging | SA WG2 | Huawei asked to be removed from the supporting compaies for this update. This was revised in SP-130328 |
SP‑130240 | Minor update of proposed new study item FS_REOPS (SP-130204) | General Dynamics Broadband UK | China Mobile asked why this study needs 1 year to complete. This was the expected time to complete. This new Study WID was then approved. |
SP‑130241 | 3 CRs to 23.272 (TEI9 - Rel-9, Rel-10, Rel-11) | SA WG2 | Stage 3 CRs have been postponed. Approved |
SP‑130242 | Rel-12 mirror CR: 23.060 CR1798: Incomplete specification text on link MTU size for IPv6 | Intel, Juniper Networks, Ericsson, ST-Ericsson, Nokia Siemens Networks | Approved. Rel-12 mirror CR missing from SP-130222 |
SP‑130243 | SA WG3 Status Report | SA WG3 Chairman | The SA WG3 Chairman was thanked for this report, which was noted. |
SP‑130244 | Revised WID for Machine-Type and other mobile data applications Communications Enhancements (MTCe) | SA WG3 | The WID was updated to add TR 23.868 in the Expected Output and Time scale clause, in SP-130327 |
SP‑130245 | Revised WID for Tunnelling of UE Services over Restrictive Access Networks (TURAN) | SA WG3 | Approved |
SP‑130246 | Revised WID for Lawful Interception Rel-12 (LI12) | SA WG3 | Approved |
SP‑130247 | TR 33.805 Study on Security Assurance Methodology for 3GPP Network Elements (SECAM) | SA WG3 | This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG3. |
SP‑130248 | Release 12 CRs on Lawful Interception (LI12) | SA WG3 | Approved |
SP‑130249 | Release 12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) (Web_GBA) | SA WG3 | Revised in SP-130301 |
SP‑130250 | Release 12 CRs on Security small Enhancements (SEC12) | SA WG3 | Approved |
SP‑130251 | Release 11 CRs on Security small Enhancements (SEC11) | SA WG3 | Approved |
SP‑130252 | Release 10 CRs on TEI (TEI10) | SA WG3 | Approved |
SP‑130253 | WITHDRAWN: Release 12 CRs on Security enhancements for usage of GBA from the browser (Web_GBA) | SA WG3 | WITHDRAWN (same as SP-130249) |
SP‑130254 | Release 12 CRs on Tunnelling of UE Services over Restrictive Access Networks (Stage 2/3) (TURAN) | SA WG3 | Approved |
SP‑130255 | Release 11 CRs on Study on Single Sign On (SSO) Application Security for IMS - based on SIP Digest (FS_SSO_APS) | SA WG3 | Approved |
SP‑130256 | Release 12 CRs for IMS media plane security extensions (eMEDIASEC) | SA WG3 | Approved |
SP‑130257 | Release 11 CRs on System Improvements to Machine-Type Communications(SIMTC) | SA WG3 | Approved |
SP‑130258 | Release 12 CRs on TEI (TEI12) | SA WG3 | Approved |
SP‑130259 | SA WG5 Status Report | SA WG5 Chairman | The SA WG5 Chairman was thanked for this report, which was noted. |
SP‑130260 | Updated WID Application Based Charging (ABC) | SA WG5 | An update to this WID, including these changes, from SA WG2 was provided in SP-130239 and this was noted. |
SP‑130261 | New WID PCEF-based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) | SA WG5 | Approved |
SP‑130262 | New WID DF-based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks(P4C-F-CH_T) | SA WG5 | Approved |
SP‑130263 | New WID Energy Efficiency related Performance Measurements (OAM-PM_EE) | SA WG5 | It was clarified that SA WG5 could start the work based on ETSI EE input and take any RAN WG2 input into account. With this this WID was approved. |
SP‑130264 | Rel-7 CRs on OAM Trace Management (OAM7-Trace) | SA WG5 | Revised in SP-130302 |
SP‑130265 | Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) | SA WG5 | Approved |
SP‑130266 | Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) | SA WG5 | Approved |
SP‑130267 | Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) | SA WG5 | Revised in SP-130304 |
SP‑130268 | Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) | SA WG5 | Approved |
SP‑130269 | Rel-8 CRs on Charging Management (CH8) | SA WG5 | Revised in SP-130303 |
SP‑130270 | Rel-11 CRs on Charging Management (CH11) | SA WG5 | Approved |
SP‑130271 | Rel-12 CRs on Charging Management (CH12) | SA WG5 | Approved |
SP‑130272 | Rel-12 CRs on Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations (OAM-NGMN) | SA WG5 | Approved |
SP‑130273 | Rel-11 CRs on Charging of SIMTC (SIMTC-CH) | SA WG5 | Approved |
SP‑130274 | Rel-12 CRs on Short Message Service - Service Center (SMS-SC) Offline Charging (SMS-SC-CH) | SA WG5 | Approved |
SP‑130275 | Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) | SA WG5 | Approved |
SP‑130276 | Rel-12 CRs on Application Based Charging (ABC) | SA WG5 | Colours should be removed on CR implementation. This was then approved. |
SP‑130277 | Rel-11 CRs on Network Provided Location Information for IMS (NWK-PL2IMS) | SA WG5 | It was commented that there were 'smart' quotes in the changes. This should be corrected on implementation. This CR was then approved. |
SP‑130278 | Rel-10 CRs on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) | SA WG5 | The mirror CRs were missing.This CR was revised to add the mirror CRs in SP-130317 |
SP‑130279 | Rel-11 CRs on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) | SA WG5 | Approved |
SP‑130280 | TS 28.390 'Fixed Mobile Convergence (FMC) Interface Integration Reference Point (IRP) Solution Profiles (SPs)' | SA WG5 | Approved |
SP‑130281 | TR 32.851 'Study of OAM aspects of Network Sharing' | SA WG5 | It was noted that harmonisation of the terminology with SA WG1 is needed. The SA WG5 Chairman reported that this is intended to be presented for approval at the next meeting with a normative work item. This draft TR was presented for information and was n |
SP‑130282 | TR 32.859 'Study on Alarm Management' | SA WG5 | This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG5. |
SP‑130283 | Proposed update to New WID on RAN Sharing Enhancements (RSE) | NEC, MCC | TeleiaSonera requested to be added as a supporting company. This was revised in SP-130330 |
SP‑130284 | Overview of ITU Activities | Telecom Italia | There were no questions or comments. The TSG SA Chairman thanked the ITU-T Ad-hoc Chairman for this comprehensive presentation which was noted. |
SP‑130285 | 3GPP Release 12 timeline and features for Public Safety Communications | Vodafone | In Summary: - 3GPP is looking forward to receiving the priorities from the Critical Communications community on the Public Safety functionalities and from the Operator community on commercial ProSe fuctonalities. A clear description of the essential funct |
SP‑130286 | TSG CT Status report | TSG CT Chairman | The TSG CT Chairman was thanked for this report, which was noted. |
SP‑130287 | TSG CT draft meeting report | TSG CT Secretary (MCC) | This was provided for information and was noted. |
SP‑130288 | IETF status report | TSG CT Chairman | The TSG CT Chairman was thanked for this report, which was noted. |
SP‑130289 | LS from TSG CT: Reply LS on Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012 | TSG CT | This was the TSG CT submission information and was noted. |
SP‑130290 | LS from TSG CT: List of 3GPP Specifications to be proposed for the 'dot 9' Release 11 update of ITU-T Recommendation Q.1741 | TSG CT | The SA WG Chairmen were asked to check this off-line. This was used as a basis for an outgoing LS in S2-130331 |
SP‑130291 | LS from WiFi Alliance: Wi-Fi Alliance Offloading Standards Work | Wi-Fi Alliance Hotspot 2.0 Marketing Task Group | The SA WG2 Chairman considered this an organisational and scoping issue which SA WG2 did not have the ability to respond to and is a cross-TSG issue. Nokia commented that SA WG2 have been considering the accommodation of HotSpot 2.0 in the specifications |
SP‑130292 | Presentation of TS 22.468 on Group Communication System Enablers for LTE (GCSE_LTE) | MCC | No revision-marked version had been provided to demonstrate the changes between the submitted versions. The SA WG1 Chairman explained that the changes were removing smart quotes, '-ise' to '-ize'. With this, the TR was approved and placed under TSG SA cha |
SP‑130293 | Priority of LTE D2D Discovery | Deutsche Telekom, NTT DoCoMo, Sprint, China Mobile, KDDI, T Mobile US, Verizon, TeliaSonera, Softbank | Nokia commented that the assumption here is that ProSe is mainly for Public Safety application, whereas the original idea for the Work Item was for commercial aspects. It was recognised that the discovery work needs to be considered in SA WG1 and this sho |
SP‑130294 | Network Provided Location Information for IMS (TWAN case) | Alcatel-Lucent, AT&T | The intention of this submission is awareness from a work planning standpoint. This was noted. |
SP‑130295 | LS from TSG RAN: Letter to ITU on the Revision of the Recommendations ITU-R M.1580 and M.1581 | TSG RAN | This was updated as an LS to the PCG in SP-130311 |
SP‑130296 | LS from TSG RAN: Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012 | TSG RAN | Revised in SP-130312 |
SP‑130297 | LS from TSG RAN: LS on Technical and Operational Aspects of Passive and Active Base Station Antennas for IMT Systems | TSG RAN | Revised in SP-130313 |
SP‑130298 | LS from TSG RAN: LS on LTE-HRPD SON WID conditional approval | TSG RAN | The Condition for the approval of the RAN WID was considered fulfilled and RAN WG3 can commence work on this. This LS was then noted. |
SP‑130299 | TSG RAN Status Report to TSG SA#60 | TSG RAN Chairman | The TSG RAN Chairman was thanked for this report, which was noted. |
SP‑130300 | Draft report of TSG RAN meeting #60 | TSG RAN Secretary (MCC) | This will be provided to the FTP server when available for information. This was noted. |
SP‑130301 | Release 12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) (Web_GBA) | SA WG3 | Approved |
SP‑130302 | Rel-7 CRs on OAM Trace Management (OAM7-Trace) | SA WG5 | RIM asked which CRs had been revised as none of them show revision numbers on the CR Cover page. This was an error in the cover table where the revision numbers had not been updated (the CRs themselves had been updated correctly). With this, these CRs wer |
SP‑130303 | Rel-8 CRs on Charging Management (CH8) | SA WG5 | It was explained that a CR was withdrawn from the CR pack as it changed clause numbering which is not allowed in CRs. This mirror CR will be submitted by SA WG5 at the next meeting. These CRs were then approved. |
SP‑130304 | Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) | SA WG5 | Approved |
SP‑130305 | 8 CRs to 23.204, 23.401, 23.272, 23.682 (SIMTC, SIMTC-Reach - Rel 11, Rel 12) | SA WG2 | Approved |
SP‑130306 | 4 CRs to 23.203, 23.228 (NWK-PL2IMS - Rel 11, Rel 12) | SA WG2 | Approved |
SP‑130307 | 1 CR to 23.002, 23.203 (SAPP - Rel-11, Rel-12) | SA WG2 | Approved |
SP‑130308 | 10 CRs to 23.221, 23.272, 23.203, 23.237, 23.292 (TEI11 - Rel-11, Rel-12) | SA WG2 | WITHDRAWN |
SP‑130309 | 6 CRs to 23.167, 23.216, 23.272 (TEI11, Earlier Rel WIs - Rel 11) | SA WG2 | Approved |
SP‑130310 | 4 CRs to 23,002, 23.401, 23.060 (LIMONET - Rel 12) | SA WG2 | Approved |
SP‑130311 | Letter to ITU on the Revision of the Recommendations ITU-R M.1580 and M.1581 | TSG SA | Approved |
SP‑130312 | Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012 | TSG SA | Approved |
SP‑130313 | LS on Technical and Operational Aspects of Passive and Active Base Station Antennas for IMT Systems | TSG SA | Approved |
SP‑130314 | Stage 1 CRs on TEI9 | SA WG1 | WITHDRAWN |
SP‑130315 | Stage 1 CRs on Proximity-based Services (ProSE) | SA WG1 | It was clarified that these revisions were to mark the UICC as impacted on the CR cover pages. These CRs were approved. |
SP‑130316 | Stage 1 CRs on Feasibility Study on Proximity-based Services (FS_ProSe) | SA WG1 | It was clarified that this revision was to mark the UICC as impacted on the CR cover page. This CR was approved. |
SP‑130317 | Rel-10 CRs on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) | SA WG5 | Approved |
SP‑130318 | 2 CRs to 23.203 (SAPP - Rel 11, Rel 12) | SA WG2 | Approved |
SP‑130319 | 2 CRs to 23.060 (SIRIG - Rel-11, Rel-12) | SA WG2 Chairman | Approved |
SP‑130320 | 4 CRs to 23.060, 23.272 (TEI11, Earlier Rel WIs - Rel 11) | SA WG2 | Approved |
SP‑130321 | Future TSG meeting dates | MCC | It was agreed to adopt the proposed meeting schedule until the experience of the March 2014 meeting. This was then noted. |
SP‑130322 | 2 CRs to 23.204 (SIMTC, SIMTC-Reach - Rel-11, Rel-12) | SA WG2 Chairman | Approved |
SP‑130323 | 2 CRs to 23.203 (NWK-PL2IMS - Rel-11, Rel-12) | SA WG2 | Approved |
SP‑130324 | 4 CRs to 23,002, 23.401, 23.060 (LIMONET - Rel 12). | SA WG2 | Approved |
SP‑130325 | Revised WID for Web Real Time Communication (WebRTC) Access to IMS | SA WG2 | Approved |
SP‑130326 | Revised WID on Group Communication System Enablers for LTE (GCSE_LTE) | SA WG1 | Approved |
SP‑130327 | Revised WID for Machine-Type and other mobile data applications Communications Enhancements (MTCe) | SA WG3 | Approved |
SP‑130328 | Revised WID on Application Based Charging | SA WG2 | Approved |
SP‑130329 | 1 CR to 23.203 (ABC - Rel-12) | SA WG2 | Approved |
SP‑130330 | Proposed update to New WID on RAN Sharing Enhancements (RSE) | NEC, MCC | Approved |
SP‑130331 | List of 3GPP Specifications for the new draft Recommendation Q.1714.9, referencing of 3GPP Release 11 | TSG SA | Approved |