3GPP TDocs (written contributions) at meeting
Meeting: C3-78b - 2014-10-20 to 2014-10-24, Sophia Antipolis
meeting id: C3-78b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C3‑144000 | Draft Agenda for the CT3#78Bis Meeting | CT3 chairman | approved |
C3‑144001 | INFO Proposed Schedule for CT3#78Bis | CT3 Chairman | revised |
C3‑144002 | Allocation of documents to agenda items (at Deadline) | CT3 Chairman | revised |
C3‑144003 | Allocation of documents to agenda items (Start of Day 1) | CT3 Chairman | revised |
C3‑144004 | Allocation of documents to agenda items (Start of Day 2) | CT3 Chairman | revised |
C3‑144005 | Allocation of documents to agenda items (Start of Day 3) | CT3 Chairman | revised |
C3‑144006 | Allocation of documents to agenda items (Start of Day 4) | CT3 Chairman | revised |
C3‑144007 | Allocation of documents to agenda items (Start of Day 5) | CT3 Chairman | revised |
C3‑144008 | Allocation of documents to agenda items (End of Day 5) | CT3 Chairman | noted |
C3‑144009 | Summary of CT#65 related to CT3 | CT3 Chairman | noted |
C3‑144010 | Status of CT3 Work Items | CT3 Chairman | revised |
C3‑144011 | Reference Update: RFC7315 | Deutsche Telekom | revised |
C3‑144012 | Reference Update: RFC7315 | Deutsche Telekom | revised |
C3‑144013 | Clarification of the transport protocol in the message coding examples | FUJITSU, NTT | revised |
C3‑144014 | Correction of TS 29.949 version 1.1.0 | FUJITSU, NTT | merged |
C3‑144015 | Correction of OCB option item | FUJITSU, NTT | agreed |
C3‑144016 | Correction of OCB option item | FUJITSU, NTT | agreed |
C3‑144017 | Draft references in CT3 specifications | Ericsson | noted |
C3‑144018 | Reference update: RFC 7329 (draft-kaplan-insipid-session-id) | Ericsson | revised |
C3‑144019 | Reference update: RFC 7329 (draft-kaplan-insipid-session-id) | Ericsson | revised |
C3‑144020 | Reference update: RFC 7329 (draft-kaplan-insipid-session-id) | Ericsson | revised |
C3‑144021 | Reference update: RFC 7329 (draft-kaplan-insipid-session-id) | Ericsson | revised |
C3‑144022 | Correcting the column name in the table 6.2 | Ericsson | revised |
C3‑144023 | Using the UE-A as the terminating side | Ericsson | revised |
C3‑144024 | Removal of EN related to extensive call flows review | Ericsson | agreed |
C3‑144025 | Removal of the use of "B" | Ericsson | revised |
C3‑144026 | Removal of ENs from the Overview | Ericsson | agreed |
C3‑144027 | Missing SRVCC identities in subclause 5.1.1.3.2 | Ericsson | agreed |
C3‑144028 | "iotl" SIP URI parameter clarification | Ericsson | agreed |
C3‑144029 | Resolving an EN about third party service providers | Ericsson | agreed |
C3‑144030 | Additional clarifications in Originating roaming without loopback | Ericsson | revised |
C3‑144031 | Resolving EN in subclause 5.8 | Ericsson | agreed |
C3‑144032 | Removing EN about completion of description from 5.3.2 | Ericsson | revised |
C3‑144033 | Removal of incorrect NOTE 4 in 5.10.3 | Ericsson | revised |
C3‑144034 | Additional clarification in originating roaming with loopback | Ericsson | revised |
C3‑144035 | Missing supported header field in 5.11.3 | Ericsson | agreed |
C3‑144036 | Resolving EN about IC-A1 and SLA | Ericsson | agreed |
C3‑144037 | Removal of EN about pre-condition from 5.10.2 | Ericsson | revised |
C3‑144038 | Removal of EN about pre-condition from 5.10.3 | Ericsson | revised |
C3‑144039 | Identity of Change history annex | Ericsson | agreed |
C3‑144040 | Minor editorials, clarifications and corrections | Ericsson | agreed |
C3‑144041 | Updating the major capability table with the PCRF based P-CSCF restoration capability | Ericsson | revised |
C3‑144042 | ICS call: reference correction | Ericsson | agreed |
C3‑144043 | Announcement suppression for IMS hold request | Ericsson | revised |
C3‑144044 | Adding missing abbreviation | Ericsson | agreed |
C3‑144045 | TRF missing in overview | Ericsson | agreed |
C3‑144046 | Handling of a 380 (Alternative service) response | Ericsson | agreed |
C3‑144047 | Minor corrections and clarifications | Ericsson | agreed |
C3‑144048 | Correcting subclause 12.1 | Ericsson | revised |
C3‑144049 | Reference to TR 29.949 | Ericsson | postponed |
C3‑144050 | New WID on CT aspects of Double Resource Reuse for Multiple Media Sessions | Ericsson | revised |
C3‑144051 | Ensuring that the OMR media path is kept | Ericsson, Deutsche Telekom | noted |
C3‑144052 | CT Aspects of QoS End-to-End MTSI Extensions | Ericsson | revised |
C3‑144053 | NAS/RAN cause handling | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | revised |
C3‑144054 | NAS/RAN cause handling | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | revised |
C3‑144055 | IPCAN Session modification after bearer procedure | Ericsson | revised |
C3‑144056 | IPCAN Session modification after bearer procedure | Ericsson | revised |
C3‑144057 | [DRAFT] Reply LS to SA5 (Cc CT4) on Removal of I-WLAN-specific AVPs | Ericsson | revised |
C3‑144058 | CR 29.217 Report Restriction Provisioning | Ericsson | revised |
C3‑144059 | Update of protocol stacks and associated text for IuCS to Mb interworking | Qualcomm Incorporated | revised |
C3‑144060 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | revised |
C3‑144061 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | revised |
C3‑144062 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | revised |
C3‑144063 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | revised |
C3‑144064 | Incorrect reference numbers | NTT | revised |
C3‑144065 | Modification regarding the description of Reason header field parameter | NTT | revised |
C3‑144066 | Network Elements of Reference Model | Huawei, Alcatel-Lucent | agreed |
C3‑144067 | Editorial Correction for 29.201 | Huawei | merged |
C3‑144068 | Specific HTTP Response Message in Different Call Flows | Huawei | merged |
C3‑144069 | Removing of Unnecessary Editor's Note of 29.201 | Huawei | revised |
C3‑144070 | Clarification of Application Delivery Layer Content Typ | Huawei | revised |
C3‑144071 | Clarification of Content Type XML | Huawei | agreed |
C3‑144072 | Allocation of the Rx Diameter Session ID in AF Establishment Procedure | Huawei | agreed |
C3‑144073 | Stateless Communication of RESTful Rx | Huawei | agreed |
C3‑144074 | Data Types and Mapping | Huawei | merged |
C3‑144075 | Presence Reporting Area Indication on TDF Session | Huawei | revised |
C3‑144076 | Editorial Correction for 29.468 | Huawei | revised |
C3‑144077 | TMGI allocation and deallocation by BM-S | Huawei | agreed |
C3‑144078 | MBMS bearers termination based on TMGI deallocation request from GCS AS | Huawei | agreed |
C3‑144079 | Removal of Editor’s Note | Huawei | revised |
C3‑144080 | P-CSCF Restoration Procedure for Local Breakout | Huawei | revised |
C3‑144081 | Enhancement for P-CSCF Restoration over S9 | Huawei | revised |
C3‑144082 | Discussion on RAN and NAS cause reporting in access network information | Huawei | noted |
C3‑144083 | Mute-Notification AVP Value on Gx Session | Huawei | revised |
C3‑144084 | Mute-Notification AVP Value on Gx Session | Huawei | revised |
C3‑144085 | Functional elements of Np reference point | Huawei, China Telecom | revised |
C3‑144086 | Adapt PCC architecture diagrams to include Np reference point | Huawei | merged |
C3‑144087 | Adapt PCC architecture diagrams to include Np reference point | Huawei | merged |
C3‑144088 | Adapt PCC architecture diagrams to include Np reference point | Huawei, China Telecom | revised |
C3‑144089 | Adapt PCC architecture diagrams to include Np reference point | Huawei, China Telecom | revised |
C3‑144090 | IMSI delivery on II-NNI | Huawei, NTT | revised |
C3‑144091 | Sending of PROGRESS upon SIP UPDATE message | Huawei | revised |
C3‑144092 | Alternative connection (ALTC) addresses management | Orange | revised |
C3‑144093 | Protocol numbers | Nokia Networks | agreed |
C3‑144094 | MB2-U Security | Nokia Networks | postponed |
C3‑144095 | MB2-U User Plane terminated in the UE | Nokia Networks | revised |
C3‑144096 | Heartbeat procedure | Nokia Networks | revised |
C3‑144097 | [DRAFT] LS to CT4 on AVPs of the GCSE MB2-C Diameter Application | Nokia Networks | postponed |
C3‑144098 | MSRP handling at the TrGW | Nokia Networks | revised |
C3‑144099 | Priority Consideration for Diameter Overload Control | ACS, OEC, AT&T, Alcatel-Lucent | withdrawn |
C3‑144100 | Priority Consideration for Diameter Overload Control | ACS, OEC, AT&T, Alcatel-Lucent | revised |
C3‑144101 | Priority Consideration for Diameter Overload Control | ACS, OEC, AT&T, Alcatel-Lucent | withdrawn |
C3‑144102 | Correction to the Gateway Control Session establishment procedure | ZTE | revised |
C3‑144103 | Correction to the Gateway Control Session establishment procedure | ZTE | revised |
C3‑144104 | Correction to the Gateway Control Session establishment procedure | ZTE | revised |
C3‑144105 | Correction to the Gateway Control Session establishment procedure | ZTE | revised |
C3‑144106 | Correction to the PC to CS handover indication | ZTE | revised |
C3‑144107 | Correction to the PC to CS handover indication | ZTE | revised |
C3‑144108 | Correction to the PC to CS handover indication | ZTE | revised |
C3‑144109 | Precedence derivation for ADC rule | ZTE | revised |
C3‑144110 | Precedence derivation for ADC rule | ZTE | revised |
C3‑144111 | PCRF discovery for the HNB CS Service | ZTE | revised |
C3‑144112 | PCRF discovery for the HNB CS Service | ZTE | revised |
C3‑144113 | Access network information reporting during the IP-CAN session termination | ZTE | revised |
C3‑144114 | Access network information reporting during the IP-CAN session termination | ZTE | revised |
C3‑144115 | Access network information reporting during the IP-CAN session termination | ZTE | revised |
C3‑144116 | Access network information reporting during the IP-CAN session termination | ZTE | revised |
C3‑144117 | Skeleton for Policy and Charging Control over Np reference point (TS 29.217) | ZTE, China Telecom, Allot Communications | revised |
C3‑144118 | Scope of 29.217 | ZTE | revised |
C3‑144119 | Np reference model | ZTE | revised |
C3‑144120 | RUCI report | China Telecom, ZTE | revised |
C3‑144121 | General descriptions of Np protocol | ZTE | revised |
C3‑144122 | Design Considerations for Np Application | ZTE | noted |
C3‑144123 | New WID CT3 Aspect of Usage Monitoring Control extension | China Telecom, ZTE | revised |
C3‑144124 | New study item on PCRF failure and restoration enhancement | ZTE | withdrawn |
C3‑144125 | New WID on IP Flow Mobility support for S2a and S2b Interfaces on stage 3 | ZTE | postponed |
C3‑144126 | Upcon related updation on definition,abbreviation and architecture part | China Telecom, | revised |
C3‑144127 | Skeleton of call flows for user plane congestion management | China Telecom, Huawei | revised |
C3‑144128 | Upcon related updation on abbreviation and architecture part | China Telecom, | merged |
C3‑144129 | MBMS restoration upon SGi-mb path failure | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | revised |
C3‑144130 | Reference correction-Domain names | Alcatel-Lucent | revised |
C3‑144131 | Rest-Rx for non-IMS scenarious | Alcatel-Lucent | agreed |
C3‑144132 | Clarification of PCC procedures over REST-Rx | Alcatel-Lucent | revised |
C3‑144133 | Traffic plane events and Rx method usage | Alcatel-Lucent | revised |
C3‑144134 | Verbal expressions in the protocol clause | Alcatel-Lucent | revised |
C3‑144135 | Definition of the AF Session ID | Alcatel-Lucent | revised |
C3‑144136 | Clarifications related to Annex A | Alcatel-Lucent | merged |
C3‑144137 | XML elements, groups and message representation | Alcatel-Lucent | merged |
C3‑144138 | Introduction of a reference to the Rest-Rx interface | Alcatel-Lucent | revised |
C3‑144139 | Adding missing security profile for DTLS | Nokia Networks | revised |
C3‑144140 | Adding missing security profile for DTLS | Nokia Networks | agreed |
C3‑144141 | MPS Support in Roaming End to End Scenarios with VoLTE IMS and Other Networks TR | ACS, OEC, AT&T | revised |
C3‑144142 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell, | revised |
C3‑144143 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell, | revised |
C3‑144144 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell, | revised |
C3‑144145 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell, | revised |
C3‑144146 | Interworking of Called IN number and original Called IN number | ORANGE | revised |
C3‑144147 | Interworking of Called IN number and original Called IN number | ORANGE | revised |
C3‑144148 | Inclusion of RAN/NAS cause values into SIP signalling by P-CSCF | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | revised |
C3‑144149 | Minutes of CT3#78 | MCC | approved |
C3‑144150 | Reply LS on LS TR 26.924 Study on improved end-to-end QoS handling (S4-140688) | C1-143388 | noted |
C3‑144151 | LS Reply on TR 26.924 Study on improved end-to-end QoS handling | C4-141616 | noted |
C3‑144152 | LS Response on introducing the EVS codec in MTSI | C4-141618 | noted |
C3‑144153 | LS on Discontinuance of 29.234 | C4-141672 | noted |
C3‑144154 | Reply LS on introducing the EVS codec in MTSI | R1-143636 | noted |
C3‑144155 | Reply LS on Security for GCSE MB2 and MTC Tsp reference point | S3-142273 | noted |
C3‑144156 | Reply LS on stage 2 related aspects of introducing the EVS codec in MTSI | S4-141042 | noted |
C3‑144157 | LS on handling of E2EMTSI WI in Rel-12 and Rel-13 | S4-141046 | noted |
C3‑144158 | LS Response on Introducing the EVS codec in MTSI | S4-141062 | noted |
C3‑144159 | LS on Removal of I-WLAN-specific AVPs | S5-144340 | noted |
C3‑144160 | LS on 3GPP work organization for Mission Critical Push to Talk | SP-140640 | noted |
C3‑144161 | LS on Evolution of Recommendation E.212 | ITU-T SG2-LS055 | noted |
C3‑144162 | 3GPP Work Plan | MCC | noted |
C3‑144163 | Calendar of upcoming CT3 meetings | MCC | noted |
C3‑144164 | Reference Update: RFC7315 | Deutsche Telekom / Michael | revised |
C3‑144165 | Interworking of Called IN number and original Called IN number | ORANGE | postponed |
C3‑144166 | Access network information reporting during the IP-CAN session termination | ZTE | revised |
C3‑144167 | Access network information reporting during the IP-CAN session termination | ZTE | revised |
C3‑144168 | New WID on IMS Stage-3 IETF Protocol Alignment | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | revised |
C3‑144169 | INFO Proposed Schedule for CT3#78Bis | CT3 Chairman | noted |
C3‑144170 | LS Response on Introducing the EVS codec in MTSI | AHEVS-347 | noted |
C3‑144171 | Interworking of Called IN number and original Called IN number | ORANGE | revised |
C3‑144172 | CT Aspects of QoS End-to-End MTSI Extensions | Ericsson | agreed |
C3‑144173 | New WID on CT aspects of Double Resource Reuse for Multiple Media Sessions | Ericsson | revised |
C3‑144174 | New WID CT3 Aspect of Usage Monitoring Control extension | China Telecom, ZTE | agreed |
C3‑144175 | Updating the major capability table with the PCRF based P-CSCF restoration capability | Ericsson | merged |
C3‑144176 | Removal of Editor’s Note | Huawei | revised |
C3‑144177 | P-CSCF Restoration Procedure for Local Breakout | Huawei | revised |
C3‑144178 | Enhancement for P-CSCF Restoration over S9 | Huawei | withdrawn |
C3‑144179 | Verbal expressions in the protocol clause | Alcatel-Lucent | revised |
C3‑144180 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | agreed |
C3‑144181 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | agreed |
C3‑144182 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | revised |
C3‑144183 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | agreed |
C3‑144184 | Reference Update: RFC7315 | Deutsche Telekom | agreed |
C3‑144185 | Reference Update: RFC7315 | Deutsche Telekom / Michael | agreed |
C3‑144186 | MSRP handling at the TrGW | Nokia Networks | agreed |
C3‑144187 | Reference update from draft-vanelburg-dispatch-private-network-ind to RFC 7316 | NTT | agreed |
C3‑144188 | Not allocated. | - | withdrawn |
C3‑144189 | Not allocated. | - | withdrawn |
C3‑144190 | Not allocated. | - | withdrawn |
C3‑144191 | Not allocated. | - | withdrawn |
C3‑144192 | Not allocated. | - | withdrawn |
C3‑144193 | XML elements, groups and message representation | Alcatel-Lucent, Huawei, Verizon | revised |
C3‑144194 | Clarifications related to Annex A | Alcatel-Lucent, Huawei, Verizon | revised |
C3‑144195 | Removing of Unnecessary Editor's Note of 29.201 | Huawei | agreed |
C3‑144196 | Clarification of Application Delivery Layer Content Typ | Huawei | agreed |
C3‑144197 | Reference correction-Domain names | Alcatel-Lucent | agreed |
C3‑144198 | Clarification of PCC procedures over REST-Rx | Alcatel-Lucent | revised |
C3‑144199 | RESOURCE_ALLOCATION_FAILURE error response not to be sent upon PCRF-initiated PCC rule removal. | Nokia Networks | revised |
C3‑144200 | RESOURCE_ALLOCATION_FAILURE error response not to be sent upon PCRF-initiated PCC rule | Nokia Networks | agreed |
C3‑144201 | RESOURCE_ALLOCATION_FAILURE error response not to be sent upon PCRF-initiated PCC rule | Nokia Networks | agreed |
C3‑144202 | RESOURCE_ALLOCATION_FAILURE error response not to be sent upon PCRF-initiated PCC rule | Nokia Networks | agreed |
C3‑144203 | RESOURCE_ALLOCATION_FAILURE error response not to be sent upon PCRF-initiated PCC rule | Nokia Networks | agreed |
C3‑144204 | Traffic plane events and Rx method usage | Alcatel-Lucent | revised |
C3‑144205 | Definition of the AF Session ID | Alcatel-Lucent | revised |
C3‑144206 | Introduction of a reference to the Rest-Rx interface | Alcatel-Lucent, Verizon | agreed |
C3‑144207 | Correcting the column name in the table 6.2 | Ericsson | agreed |
C3‑144208 | Additional clarifications in Originating roaming without loopback | Ericsson, Fujitsu, NTT | agreed |
C3‑144209 | Using the UE-A as the terminating side | Ericsson | agreed |
C3‑144210 | Removal of the use of "B" | Ericsson | agreed |
C3‑144211 | Removing EN about completion of description from 5.3.2 | Ericsson | agreed |
C3‑144212 | Removal of incorrect NOTE 4 in 5.10.3 | Ericsson | agreed |
C3‑144213 | Additional clarification in originating roaming with loopback | Ericsson | agreed |
C3‑144214 | Removal of EN about pre-condition from 5.10.2 | Ericsson | agreed |
C3‑144215 | Removal of EN about pre-condition from 5.10.3 | Ericsson | agreed |
C3‑144216 | MPS Support in Roaming End to End Scenarios with VoLTE IMS and Other Networks TR | ACS, OEC, AT&T | agreed |
C3‑144217 | Discussion on the new cause value URI parameter for service number translation | Orange | noted |
C3‑144218 | Editorial Correction for 29.468 | Huawei | agreed |
C3‑144219 | Heartbeat procedure | Nokia Networks | revised |
C3‑144220 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell | agreed |
C3‑144221 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell | agreed |
C3‑144222 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Verizon, Cisco, Alcatel-Lucent Shanghai Bell | agreed |
C3‑144223 | P-CSCF Failure alignment with stage 2 | Alcatel-Lucent, Cisco, Verizon, Alcatel-Lucent Shanghai Bell | agreed |
C3‑144224 | Correction to the Gateway Control Session establishment procedure | ZTE | agreed |
C3‑144225 | Correction to the Gateway Control Session establishment procedure | ZTE | agreed |
C3‑144226 | Correction to the Gateway Control Session establishment procedure | ZTE | agreed |
C3‑144227 | Correction to the Gateway Control Session establishment procedure | ZTE | agreed |
C3‑144228 | Correction to the PC to CS handover indication | ZTE | revised |
C3‑144229 | Correction to the PC to CS handover indication | ZTE | agreed |
C3‑144230 | Correction to the PC to CS handover indication | ZTE | agreed |
C3‑144231 | Correction to the PC to CS handover indication | ZTE | agreed |
C3‑144232 | Mute-Notification AVP Value on Gx Session | Huawei | revised |
C3‑144233 | Mute-Notification AVP Value on Gx Session | Huawei | revised |
C3‑144234 | Precedence derivation for ADC rule | ZTE | agreed |
C3‑144235 | Precedence derivation for ADC rule | ZTE | agreed |
C3‑144236 | Not allocated. | - | withdrawn |
C3‑144237 | Not allocated. | - | withdrawn |
C3‑144238 | Not allocated. | - | withdrawn |
C3‑144239 | Not allocated. | - | withdrawn |
C3‑144240 | MB2-U User Plane terminated in the UE | Nokia Networks | agreed |
C3‑144241 | Heartbeat procedure | Nokia Networks | revised |
C3‑144242 | Priority Consideration for Diameter Overload Control | ACS, OEC, AT&T, Alcatel-Lucent | revised |
C3‑144243 | MBMS restoration upon SGi-mb path failure | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | revised |
C3‑144244 | Clarification of the transport protocol in the message coding examples | FUJITSU, NTT | agreed |
C3‑144245 | RESOURCE_ALLOCATION_FAILURE error response not to be sent upon PCRF-initiated PCC rule | Nokia Networks | agreed |
C3‑144246 | NAS/RAN cause handling | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | revised |
C3‑144247 | Reporting RAN/NAS cause during bearer creation/modification failure scenarious | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | revised |
C3‑144248 | Inclusion of RAN/NAS cause values into SIP signalling by P-CSCF | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | agreed |
C3‑144249 | [DRAFT] Reply LS to SA5 (Cc CT4) on Removal of I-WLAN-specific AVPs | Ericsson | approved |
C3‑144250 | Presence Reporting Area Indication on TDF Session | Huawei | revised |
C3‑144251 | IPCAN Session modification after bearer procedure | Ericsson | revised |
C3‑144252 | IPCAN Session modification after bearer procedure | Ericsson | revised |
C3‑144253 | Number of standard QCI values | Motorola | agreed |
C3‑144254 | Upcon related updation on definition,abbreviation and architecture part | China Telecom, | revised |
C3‑144255 | UPCON related update about definition,abbreviation and achitecture part | Huawei | agreed |
C3‑144256 | Update PCC architecture diagrams to include Np reference point | Huawei, China Telecom | agreed |
C3‑144257 | Adapt PCC architecture diagrams to include Np reference point | Huawei, China Telecom | revised |
C3‑144258 | Skeleton of call flows for user plane congestion management | China Telecom, Huawei | endorsed |
C3‑144259 | Skeleton for Policy and Charging Control over Np reference point | ZTE, China Telecom, Allot Communications | revised |
C3‑144260 | Scope of 29.217 | ZTE | agreed |
C3‑144261 | Np reference model | ZTE | agreed |
C3‑144262 | Functional elements of Np reference point | Huawei, China Telecom | agreed |
C3‑144263 | RUCI report | China Telecom, ZTE | revised |
C3‑144264 | General descriptions of Np protocol | ZTE | revised |
C3‑144265 | Report Restriction Provisioning | Ericsson | agreed |
C3‑144266 | Alternative connection (ALTC) addresses management | Orange | revised |
C3‑144267 | Update of protocol stacks and associated text for IuCS to Mb interworking | Qualcomm Incorporated | revised |
C3‑144268 | Announcement suppression for IMS hold request | Ericsson | agreed |
C3‑144269 | Correcting subclause 12.1 | Ericsson | agreed |
C3‑144270 | Incorrect reference numbers | NTT | agreed |
C3‑144271 | Sending of PROGRESS upon SIP UPDATE message | Huawei | revised |
C3‑144272 | Modification regarding the description of Reason header field parameter | NTT | revised |
C3‑144273 | Alternative connection (ALTC) addresses management | Orange | revised |
C3‑144274 | IMSI delivery on II-NNI | Huawei, NTT DoCoMo, Ericsson | revised |
C3‑144275 | Update of protocol stacks and associated text for IuCS to Mb interworking | Qualcomm Incorporated | agreed |
C3‑144276 | Sending of PROGRESS upon SIP UPDATE message | Huawei | revised |
C3‑144277 | MBMS restoration upon SGi-mb path failure | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | revised |
C3‑144278 | Sending of PROGRESS upon SIP UPDATE message | Huawei | agreed |
C3‑144279 | Alternative connection (ALTC) addresses management | Orange | agreed |
C3‑144280 | Interworking of Called IN number and original Called IN number | ORANGE | agreed |
C3‑144281 | Status/results of UPCON drafting session | Oracle | noted |
C3‑144282 | Correction to the PC to CS handover indication | ZTE | agreed |
C3‑144283 | Mute-Notification Status on Gx and Sd Session | Huawei | agreed |
C3‑144284 | Mute-Notification Status on Gx and Sd Session | Huawei | agreed |
C3‑144285 | PCRF discovery for the HNB CS Service | ZTE | agreed |
C3‑144286 | PCRF discovery for the HNB CS Service | ZTE | agreed |
C3‑144287 | IPCAN Session modification after bearer procedure | Ericsson | agreed |
C3‑144288 | IPCAN Session modification after bearer procedure | Ericsson | agreed |
C3‑144289 | Access network information reporting during the IP-CAN session termination | ZTE | withdrawn |
C3‑144290 | Access network information reporting during the IP-CAN session termination | ZTE | agreed |
C3‑144291 | Access network information reporting during the IP-CAN session termination | ZTE | agreed |
C3‑144292 | Access network information reporting during the IP-CAN session termination | ZTE | agreed |
C3‑144293 | Clarification of PCC procedures over REST-Rx | Alcatel-Lucent | agreed |
C3‑144294 | withdrawn | - | withdrawn |
C3‑144295 | Verbal expressions in the protocol clause | Alcatel-Lucent, Huawei, Verizon | revised |
C3‑144296 | Definition of the AF Session ID | Alcatel-Lucent, Verizon | revised |
C3‑144297 | Removal of Editor’s Note | Huawei | agreed |
C3‑144298 | P-CSCF Restoration Procedure for Local Breakout | Huawei | agreed |
C3‑144299 | Clarifications related to Annex A | Alcatel-Lucent, Huawei, Verizon | revised |
C3‑144300 | XML elements, groups and message representation | Alcatel-Lucent, Huawei, Verizon | revised |
C3‑144301 | MBMS restoration upon SGi-mb path failure | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | agreed |
C3‑144302 | Presence Reporting Area Indication on TDF Session | Huawei | revised |
C3‑144303 | Heartbeat procedure | Nokia Networks | agreed |
C3‑144304 | Priority Consideration for Diameter Overload Control | ACS, OEC, AT&T, Alcatel-Lucent | agreed |
C3‑144305 | NAS/RAN cause handling | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | agreed |
C3‑144306 | Reporting RAN/NAS cause during bearer creation/modification failure scenarious | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | agreed |
C3‑144307 | Adapt PCC architecture diagrams to include Np reference point | Huawei, China Telecom | agreed |
C3‑144308 | RUCI report | China Telecom, ZTE | agreed |
C3‑144309 | General descriptions of Np protocol | ZTE | agreed |
C3‑144310 | Upcon related updation on definition,abbreviation and architecture part | China Telecom, | agreed |
C3‑144311 | Presence Reporting Area Indication on TDF Session | Huawei | agreed |
C3‑144312 | Skeleton for Policy and Charging Control over Np reference point | ZTE, China Telecom, Allot Communications | agreed |
C3‑144313 | New WID on IMS Stage-3 IETF Protocol Alignment | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | endorsed |
C3‑144314 | New WID on CT aspects of Double Resource Reuse for Multiple Media Sessions | Ericsson | agreed |
C3‑144315 | Status of CT3 Work Items | CT3 Chairman | approved |
C3‑144316 | TR 29.949 v1.2.0 | Editor (Deutsche Telekom/Ericsson) | revised |
C3‑144317 | TS 29.217 v.0.3.0 | Editor | revised |
page generated from database: 2024-07-20 12:15:34