3GPP TDocs (written contributions) at meeting
Meeting: SP-40 - 2008-06-02 to 2008-06-05, Prague
meeting id: SP-40 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
SP‑080226 | Draft agenda for TSG SA meeting #40 | TSG SA Chairman | Approved |
SP‑080227 | Draft report of TSG SA Meeting #39 | TSG SA Secretary | Revised in SP-080393 |
SP‑080228 | ATIS Inter-Carrier VoIP Call Routing (IVCR) Assessment and Work Plan | ATIS | Noted |
SP‑080229 | Liaison (from IEEE P802.11) to 3GPP SA and 3GPP SA WG2 requesting recommendations | IEEE P802.11 | Noted |
SP‑080230 | Invitation to attend the ETSI workshop on NGN Interconnection, 9th June 2008, ETSI Premises | ETSI Board | Noted. LS drafted in SP-080404 |
SP‑080231 | LS from CT WG1: Comments on the LS on CSG requirements for UTRA/E-UTRA | CT WG1 | Noted |
SP‑080232 | LS (from CT WG1) on NGCN issues and proposed workshop | CT WG1 | Noted |
SP‑080233 | LS (from CT WG3) on CT-wide WID on enhancement of multimedia interworking between IM CN subsystem and Circuit Switched network | CT WG3 | Revised in SP-080289 |
SP‑080234 | LS reply (from CT WG5) on transfer of OSA API work from 3GPP to OMA | CT WG5 | Noted |
SP‑080235 | LS (from TSG GERAN) on Support for Additional Navigation Satellite Systems (ANSS) for LCS | TSG GERAN | Noted |
SP‑080236 | LS from ETSI MSG: Answer to Progress of eCall requirements | ETSI MSG | Noted |
SP‑080237 | Liaison (from MSF Technical Committee) Regarding Global MSF Interoperability - GMI2008 Event | MSF Technical Committee | Noted. Response drafted in SP-080405 |
SP‑080238 | LS from OMA: Status update of Parlay affiliation into OMA | OMA | Noted |
SP‑080239 | LS Reply (from OMA) to 3GPP on Transfer of OSA API work from 3GPP to OMA | OMA | Noted |
SP‑080240 | LS (from RAN WG2) on CSG requirements for UTRA/E-UTRA | RAN WG2 | Noted |
SP‑080241 | Reply LS (from SA WG2) on request for recommendations (on IEEE 802.11u approach) | SA WG2 | Noted |
SP‑080242 | LS (from SA WG2) on IMS Emergency Registration | SA WG2 | Noted |
SP‑080243 | SA WG4 Status Report at TSG SA#40 | SA WG4 Chairman | Noted |
SP‑080244 | New WID on "Encoding formats, transport formats and media description signalling for interworking, QoE, and other enhancements to MTSI-MHI" | SA WG4 | Revised in SP-080443 |
SP‑080245 | New WID on "Media Requirements for CS over IP based User Plane (CSoIP)" | SA WG4 | Revised in SP-080444 |
SP‑080246 | Revised WID "MTSI Video: Dynamic Rate Adaptation/Signalling of Image Size" (SP-070755) | SA WG4 | Approved |
SP‑080247 | CRs TS 26.111 on "Use of AMR-WB in 3G-324M" (Release 6 and Release 7) | SA WG4 | Approved |
SP‑080248 | CRs TS 26.114 on "Various Corrections for IMS Multimedia Telephony; Media Handling and Interaction (MTSI-MHI)" (Release 7) | SA WG4 | Approved |
SP‑080249 | CR TS 26.114 on "Introduction of network preference management object" (Release 7) | SA WG4 | Approved |
SP‑080250 | CR TS 26.201 on "Obsoleteness of class C definition" (Release 7) | SA WG4 | Approved |
SP‑080251 | CR TS 26.346 on "Correction to caching directive signaling" (Release 7) | SA WG4 | Approved |
SP‑080252 | LS (from SA WG2) on UE Radio Capabilities | SA WG2 | Noted |
SP‑080253 | Report of TSG GERAN activities to TSG SA # 40 | TSG GERAN Chairman | Noted |
SP‑080254 | Terminology for IMS Credentials in Common IMS | Qualcomm Europe, US Cellular, China Unicom | Revised in SP-080401 |
SP‑080255 | SA WG3 Status Report to SA#40 | SA WG3 Chairman | Noted |
SP‑080256 | Draft Report of SA WG3 Meeting #51 | SA WG3 Secretary | Noted |
SP‑080257 | TS 33.401 3GPP System Architecture Evolution (SAE): Security Architecture - for SA Approval | SA WG3 | Approved. Exception Granted |
SP‑080258 | TS 33.402 3GPP System Architecture Evolution (SAE); Security aspects of non-3GPP accesses - for SA Approval | SA WG3 | Approved. Exception Granted |
SP‑080259 | TS 33.223 Generic Authentication Architecture (GAA); Generic Bootstrapping Architecture (GBA) Push Function - for SA approval | SA WG3 | Approved. Exception Granted |
SP‑080260 | CR to 43.022: correction of reference | SA WG3 | Approved |
SP‑080261 | CR to 22.022: Completion of sentence concerning control key length increase in OTA de-personalisation message | SA WG3 | Revised in SP-080415 |
SP‑080262 | CRs to 33.107: Lawful Interception | SA WG3 | Approved |
SP‑080263 | CR to 33.108: MBMS LI functionality | SA WG3 | Approved |
SP‑080264 | CRs to 33.203 on Packet Cable Security Enhancements | SA WG3 | Approved |
SP‑080265 | CRs on Clarification of usage of NULL encyption and TLS (33.203 and 33.222) | SA WG3 | Approved |
SP‑080266 | CR to 33.246 on MBMS | SA WG3 | Approved |
SP‑080267 | CR to 33.102 on reservation of 8 AMF bits for standardization purposes | SA WG3 | Approved |
SP‑080268 | CR to 33.203 on introduction of support for 3GPP2 IMS Access Security | SA WG3 | Approved |
SP‑080269 | CR to 33.141 on changes to support common IMS between 3GPP and 3GPP2 | SA WG3 | Revised in SP-080424 |
SP‑080270 | Status report of SA WG5 | SA WG5 Chairman | Noted |
SP‑080271 | R7/8 CRs on Charging Management (CH7) | SA WG5 | Approved |
SP‑080272 | R7/8 CRs on OAM&P (OAM7, OAM7-NIM, OAM7-PM, OAM7-Trace) | SA WG5 | Revised in SP-080328 |
SP‑080273 | TR 30.817-100 Telecommunications management; Project scheduling and open issues for SA WG5 (Release 8) - for SA Information + Approval | SA WG5 | Approved |
SP‑080274 | R8 CRs on EPC Charging (EPC-CH) | SA WG5 | Approved |
SP‑080275 | Revised BB-level WID on Self-Organizing Networks (SON) (Acronym: E-UTRAN-OAM) | SA WG5 | Approved |
SP‑080276 | New WID on SOAP Solution Sets | SA WG5 | Approved |
SP‑080277 | R8 CRs on OAM&P (OAM8) | SA WG5 | Revised in SP-080329 |
SP‑080278 | TS 32.123-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); CORBA Solution Set - for SA Approval | SA WG5 | Approved |
SP‑080279 | R8 CRs on Charging Management (CH8) | SA WG5 | Revised in SP-080330 |
SP‑080280 | TR 32.819-200 Telecommunications management; Element management layer - Operation System Function (E-OSF) definition - for SA Approval | SA WG5 | Revised in SP-080447 |
SP‑080281 | New SID on Study on SOA for IRP (OAM-Studies) | SA WG5 | Approved |
SP‑080282 | Draft TS 21.201 "Technical Specifications and Technical Reports relating to an Evolved Packet System (EPS) based 3GPP system" for information | MCC Specifications Manager | Noted |
SP‑080283 | Draft TS 21.202 "Technical Specifications and Technical Reports relating to the Common IP Multimedia Subsystem (IMS)" for information | MCC Specifications Manager | Noted |
SP‑080284 | Proposed closure of Release 99 | MCC Specifications Manager | Noted |
SP‑080285 | Support Team Report | MCC Specifications Manager | Revised in SP-080454 |
SP‑080286 | Specs status at end of SA meeting | MCC Specifications Manager | Noted. To be provided after meeting |
SP‑080287 | CRs on E-UTRAN-OAM | SA WG5 | Approved |
SP‑080288 | IMS Centralised Services: I1 reference point analysis | Vodafone | Noted |
SP‑080289 | LS (from CT WG3) on CT-wide WID on enhancement of multimedia interworking between IM CN subsystem and Circuit Switched network | CT WG3 | Noted |
SP‑080290 | ATIS Inter-Carrier VoIP Call Routing (IVCR) Assessment and Work Plan | ATIS | WITHDRAWN |
SP‑080291 | LS (from SA WG1) on Unauthenticated PS emergency calls | SA WG1 | Noted |
SP‑080292 | LS on "MSG Answer to Progress of eCall requirements" | SA WG1 | Noted |
SP‑080293 | Reply LS (from SA WG1) on Transfer of OSA API work from 3GPP to OMA | SA WG1 | Noted |
SP‑080294 | Reply LS on CSG requirements for UTRA/E-UTRA | SA WG1 | Noted |
SP‑080295 | Reply LS on NGCN issues and proposed workshop | SA WG2 | Noted |
SP‑080296 | Status Report from SA WG1 to TSG SA#40 | SA WG1 Chairman | Noted |
SP‑080297 | Stage 1 CRs on Adding and removing media during a multimedia service session | SA WG1 | Approved |
SP‑080298 | Stage 1 CRs on 3GPP2 Input to Common IMS | SA WG1 | Approved |
SP‑080299 | Stage 1 CRs on eCall | SA WG1 | Approved |
SP‑080300 | Stage 1 CRs on ETWS | SA WG1 | Approved |
SP‑080301 | Stage 1 CRs on Home NodeB / eNodeB | SA WG1 | Approved |
SP‑080302 | Stage 1 CRs on ICE | SA WG1 | Approved |
SP‑080303 | Stage 1 CRs on Removal of PNE network functionality from R8 to align with CT1 | SA WG1 | Approved |
SP‑080304 | Stage 1 CRs on Paging Permission with Access Control restriction to UTRAN | SA WG1 | Noted. CR0119 revised by company contribution in SP-080325 |
SP‑080305 | CR on applicability of Multimedia Priority Service | SA WG1 | Approved |
SP‑080306 | Stage 1 CRs on Evolved Packet System | SA WG1 | Approved, except 22.011 CR0117R1 |
SP‑080307 | CR on 22.173 on Clarifications on media interworking for IMS Multimedia telephony | SA WG1 | Approved |
SP‑080308 | CRs on 22.101 on Clarification of IMS Emergency Calls and Emergency Call Feature Interaction | SA WG1 | Approved |
SP‑080309 | Change of Reference number for TR 22.812 to TR 22.912 (ANT-NSR) | SA WG1 | Approved |
SP‑080310 | CR on an optional service invocation method for MPS | SA WG1 | Approved |
SP‑080311 | CR on Requirements for Service Alignment and Migration | SA WG1 | Approved |
SP‑080312 | TS 22.xyz v1.0.0 TISPAN Videotelephony over NGN Service Description (TISPAN spec passed for maintenance purposes) | SA WG1 | Approved |
SP‑080313 | TR 22.912 v1.0.0 Non 3GPP access Network Selection Principles | SA WG1 | Revised in SP-080403 |
SP‑080314 | TS 22.183 v1.0.0 Customized Ringing Signal (CRS) Requirements; Stage 1 | SA WG1 | Noted |
SP‑080315 | WID on Maintenance of TISPAN release 1 common IMS | SA WG1 | Approved |
SP‑080316 | Revised WID on PNM – Rel-8 WID with reduced scope | SA WG1 | Corrected version proposed by Vodafone in SP-080327 (Revised) |
SP‑080317 | WID on Enhancements to Personal Network Management (EPNM) | SA WG1 | Revised in SP-080430 |
SP‑080318 | Revised WID on Non 3GPP access NSP | SA WG1 | Approved |
SP‑080319 | WID on Service Specific Access Control in EPS (SSAC) | SA WG1 | Approved |
SP‑080320 | WID on Study on Unauthenticated PS Emergency Calls (UAPSEC) | SA WG1 | Approved |
SP‑080321 | WID on Network Improvements for Machine-type Communications (NIMTC) | SA WG1 | Noted. Return to SA WG1 |
SP‑080322 | New WID on User Data Convergence (UDC) | SA WG1 | Revised in SP-080448 |
SP‑080323 | New WID on Enhanced Home NodeB / eNodeB (EHNB) | SA WG1 | Revised in SP-080449 |
SP‑080324 | WID on Multi-Media Telephony Service enhancements | SA WG1 | Approved. SA WG1 to update WID |
SP‑080325 | CR to 22.011: PPAC restriction to UTRAN | NTT DoCoMo, KDDI, NEC, Panasonic, OKI | Revised in SP-080431 |
SP‑080326 | On support of voice in a mixed LTE and 2G/3G environment | TeliaSonera | Noted. CR in SP-080268 agreed and LS in SP-080402 |
SP‑080327 | Revised WID on PNM – Rel-8 WID with reduced scope | Vodafone | Approved |
SP‑080328 | R7/8 CRs on OAM&P (OAM7, OAM7-NIM, OAM7-PM, OAM7-Trace) | SA WG5 | Approved |
SP‑080329 | R8 CRs on OAM&P (OAM8) | SA WG5 | Approved |
SP‑080330 | R8 CRs on Charging Management (CH8) | SA WG5 | Approved |
SP‑080331 | Revised 23.401 CR 0372 (UE Capability handling) | Ericsson, Alcatel-Lucent, NSN, Samsung, Nokia, Qualcomm, NEC | Approved |
SP‑080332 | WID: Optimisations for single-radio handover between 3GPP accesses and mobile WiMAX access | Intel, Motorola, Nextwave, Alcatel-Lucent, Sprint, Samsung, InterDigital, Cisco, BT, SK Telecom, KTF, Starent Networks, Toshiba, Sierra Wireless, WiChorus, Bridgewater, Nortel, Telcordia | Noted (not enough support) |
SP‑080333 | Improvement of the binding among stages | Telecom Italia | - |
SP‑080334 | LS from TSG CT: LS on Transfer of OSA API work from 3GPP to OMA | TSG CT | Revised in SP-080427 |
SP‑080335 | LS from TSG CT: Reply LS on UE Radio Capabilities | TSG CT | Noted |
SP‑080336 | LS from TSG CT: LS on documentation of TISPAN Rel-2 in 3GPP | TSG CT | LS drfated in SP-080418 |
SP‑080337 | Draft meeting report from TSG CT#40 | TSG CT Secretary | Noted |
SP‑080338 | TSG CT Status report | TSG CT Chairman | Noted |
SP‑080339 | SAE Progress in TSG CT | TSG CT Chairman | Noted |
SP‑080340 | LS from TSG RAN: Response LS on UE Radio Capabilities | TSG RAN | Noted |
SP‑080341 | LS from TSG RAN: LS on decision for NW interface option for ETWS support | TSG RAN | Noted. Response in SP-080426 |
SP‑080342 | IETF Status Report | TSG CT Chairman/IETF dependences Rapporteur | Noted |
SP‑080343 | Separation of 3GPP2 CRBT from SA WG2 CAT Study | Alcatel-Lucent, Verizon | Revised in SP-080400 |
SP‑080344 | Use cases for WiMAX SR Optimized Handover | Sprint, SK Telecom | Noted |
SP‑080345 | ETWS for E-UTRAN (impact analysis in SA WG2) | NTT DoCoMo | Noted |
SP‑080346 | LS from TSG RAN: LS on HSPA VoIP Continuity Solution | TSG RAN | Response drafted in SP-080402 |
SP‑080347 | Status Report of TSG RAN #40 | TSG RAN Chairman | Noted |
SP‑080348 | Updated 3GPP Work Plan | MCC Work Plan Manager (AZ) | Noted |
SP‑080349 | Work Plan Slide Review | MCC Work Plan Manager (AZ) | Revised in SP-080455 |
SP‑080350 | Status report from SA WG2 to TSG SA#40 | SA WG2 Chairman | Noted |
SP‑080351 | New WID: LCS Control Plane Solution for EPS | SA WG2 | Revised in SP-080445 |
SP‑080352 | Updated WID: Support for IMS Emergency Calls over GPRS and EPS | SA WG2 | Approved |
SP‑080353 | Updated WID: MBMS support in EPS (was MBMS support in EPS for E UTRAN) | SA WG2 | Revised in SP-080442 |
SP‑080354 | TR 23.810: IMS Service Broker | SA WG2 | Noted |
SP‑080355 | TR 23.872: Customized Alerting Tone with IMS (IMS CAT) | SA WG2 | Noted |
SP‑080356 | TS 23.216: Single Radio Voice Call Continuity (SRVCC) | SA WG2 | Approved |
SP‑080357 | TS 23.272: Circuit Switched Fallback in Evolved Packet System | SA WG2 | Approved |
SP‑080358 | TS 23.327: I-WLAN mobility | SA WG2 | Approved |
SP‑080359 | TS 23.237: Multimedia Session Continuity (MMSC) | SA WG2 | Approved |
SP‑080360 | TS 23.292: IMS Centralized Service Control (ICS) | SA WG2 | Approved |
SP‑080361 | TR 23.893: FS on Multimedia Session Continuity | SA WG2 | Approved |
SP‑080362 | TR 23.828: Earthquake and Tsunami Warning System (ETWS) | SA WG2 | Noted |
SP‑080363 | 3 CRs to 23.141, 23.167 and 23.228: (CIMS_3GPP2, Rel-8) | SA WG2 | Approved |
SP‑080364 | 3 CRs to 23.167: (EMC1, Rel-7) | SA WG2 | Approved |
SP‑080365 | 2 CRs to 23.228: Update of GRUU references (GRUU, Rel-7, Rel-8) | SA WG2 | Approved |
SP‑080366 | 3 CRs to 23.228: (IMS_Comm_Doc, Rel-8) | SA WG2 | Approved |
SP‑080367 | 2 CRs to 23.506 and 23.509: (IMS_Comm_Doc, Rel-7, Rel-8) | SA WG2 | 23.506 CR0001R1 rejected, 23.509 CR0001 approved. |
SP‑080368 | 7 CRs to 23.204: (MESSIW-St2, Rel-8) | SA WG2 | Approved |
SP‑080369 | 10 CRs to 23.203: (PCC, Rel-7, Rel-8) | SA WG2 | Approved |
SP‑080370 | 14 CRs to 23.060: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080371 | 14 CRs to 23.060: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080372 | 9 CRs to 23.203: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080373 | 10 CRs to 23.203: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080374 | 3 CRs to 23.221 and 23.228: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080375 | 12 CRs to 23.401: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080376 | 12 CRs to 23.401: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080377 | 12 CRs to 23.401: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080378 | 12 CRs to 23.401: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080379 | 6 CRs to 23.401: (SAES, Rel-8) | SA WG2 | Approved, except CR0222R2 |
SP‑080380 | 1 CR to 23.401: UE capability handling in LTE/SAE (SAES, Rel-8) | SA WG2 | Noted |
SP‑080381 | 1 CR to 23.401: P-GW initiated bearer deactivation with ISR activated, ISR for Rel-8 TAU/RAU Procedures, Encryption for PAP/CHAP parameters at UE Attach, NAS/AS inter-actions and PCC Interaction (SAES, Rel-8) | SA WG2 | Approved |
SP‑080382 | 9 CRs to 23.402: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080383 | 12 CRs to 23.402: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080384 | 12 CRs to 23.402: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080385 | 12 CRs to 23.402: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080386 | 12 CRs to 23.402: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080387 | 8 CRs to 23.402: (SAES, Rel-8) | SA WG2 | Approved |
SP‑080388 | 2 CRs to 23.402: (SAES, Rel-8) | SA WG2 | CR0229R6 was approved. CR 0261R2 noted. |
SP‑080389 | 6 CRs to 23.060, 23.167 and 23.228: (TEI8, Rel-8) | SA WG2 | Approved |
SP‑080390 | 6 CRs to 23.060, 23.203, 23.228 and 23.234: (TEI7, Rel-7, Rel-8) | SA WG2 | Approved |
SP‑080391 | 2 CRs to 23.246: (TEI7, Rel-7, Rel-8) | SA WG2 | CR0199R2 was rejected. CR0200R1 revised to correct the Category to "C" and TEI8 in SP-080416 |
SP‑080392 | 1 CR to 23.228: Removal of 'Adding UE capability as one of Service Point Trigger' (TEI8, Rel-8) | SA WG2 | Approved |
SP‑080393 | Draft report of TSG SA Meeting #39 | TSG SA Secretary | Approved |
SP‑080394 | I1 Interface in ICS | Nortel, Alcatel-Lucent, Samsung | Noted |
SP‑080395 | Discussion Document on proposed change to SA WG1 CR in S1-080752 | Nokia Siemens Networks | CR Revised in SP-080432 |
SP‑080396 | TSG Leadership Recommendations on Process Improvements | TSG SA Chairman | Noted |
SP‑080397 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#20, Juan Les Pins, France, 22 April 2008 | TSG SA Chairman | Noted |
SP‑080398 | WID: Optimisations for single-radio handover between 3GPP accesses and mobile WiMAX access | Intel, Motorola, Nextwave, Alcatel-Lucent, Sprint, Samsung, InterDigital, Cisco, BT, SK Telecom, KTF, Starent Networks, Toshiba, Sierra Wireless, WiChorus, Bridgewater, Nortel, Telcordia, Rogers Wireless | WITHDRAWN |
SP‑080399 | eCall MSC impact discussion | Ericsson | Noted |
SP‑080400 | Separation of 3GPP2 CRBT from SA WG2 CAT Study | Alcatel-Lucent, Verizon, Sprint, Motorola, Cisco, Nortel, SK Telecom, Samsung, Qualcomm | Revised in SP-080414 |
SP‑080401 | Terminology for IMS Credentials in Common IMS | Qualcomm Europe, US Cellular, China Unicom, Sprint, KDDI | Noted |
SP‑080402 | LS on Guidance on HSPA VoIP Continuity Solution | TSG SA | Revised in SP-080436 |
SP‑080403 | TR 22.912 v1.0.0 Non 3GPP access Network Selection Principles | SA WG1 | TR in SP-080313: Approved |
SP‑080404 | LS on NGN Interconnection work | TSG SA | Revised in SP-080437 |
SP‑080405 | LS on MSF GMI2008 | TSG SA | Approved |
SP‑080406 | LS (from GSMA SCaG) to ETSI SCP and 3GPP on SIM usage in M2M applications | GSMA SCaG | WITHDRAWN |
SP‑080407 | LS (from GSMA SCaG) to ETSI SCP and 3GPP on SIM usage in M2M applications | GSMA SCaG | Response drafted in SP-080433 |
SP‑080408 | Draft report of TSG RAN#40 | TSG RAN Secretary (MCC) | Noted |
SP‑080409 | Proposed initial submission for 'complete' update of UTRA FDD and TDD in rev 9 of ITU-R Recommendation M.1457 | TSG RAN | Endorsed |
SP‑080410 | Update information on the roadmap IMT 2000 CDMA DS and IMT 2000 CDMA TDD | TSG RAN | Endorsed |
SP‑080411 | Proposed revision of ITU-R Recommendation M.1580-2 | TSG RAN | Endorsed |
SP‑080412 | Proposed revision of ITU-R Recommendation M.1581-2 | TSG RAN | Endorsed |
SP‑080413 | Update to ITU-R on the work on LTE-Advanced in 3GPP towards IMT-Advanced | TSG RAN | Endorsed |
SP‑080414 | Separation of 3GPP2 CRBT from SA WG2 CAT Study | Alcatel-Lucent, Verizon, Sprint, Motorola, Cisco, Nortel, SK Telecom, Samsung, Qualcomm | Noted |
SP‑080415 | CR to 22.022: Completion of sentence concerning control key length increase in OTA de-personalisation message | SA WG3 | Revised in SP-080419 |
SP‑080416 | 1 CR to 23.246: Location dependent data flows for MBMS Broadcast (TEI8, Rel-8) | TSG SA | Approved |
SP‑080417 | Calendar of TSG meetings | MCC | Noted |
SP‑080418 | LS on documentation of TISPAN Rel-2 in 3GPP | TSG SA | Revised in SP-080451 |
SP‑080419 | CR to 22.022: Completion of sentence concerning control key length increase in OTA de-personalisation message | SA WG3 | Approved |
SP‑080420 | 23.402 CR0261R3 | Nextwave, NEC | Revised in SP-080434 |
SP‑080421 | Report from drafting session on VCC solutions | Drafting session convener | Noted |
SP‑080422 | Drafting session on VCC solutions | TeliaSonera | Noted |
SP‑080423 | LS to SA WG2 and CT WG1 on generalising the term "ISIM" for security credentials | TSG SA | Approved |
SP‑080424 | CR to 33.141 on changes to support common IMS between 3GPP and 3GPP2 | SA WG3 | Revised in SP-080428 |
SP‑080425 | Draft LS on freeze of stage 2 specifications of the Evolved Packet System in 3GPP | Alcatel-Lucent, Verizon, Nortel, Motorola (TSG SA) | Revised in SP-080441 |
SP‑080426 | Response LS to TSG RAN on decision for NW interface option for ETWS support | TSG SA | Revised in SP-080438 |
SP‑080427 | LS on Transfer of OSA API work from 3GPP to OMA | TSG SA | Revised in SP-080439 |
SP‑080428 | CR to 33.141 on changes to support common IMS between 3GPP and 3GPP2 | SA WG3 | Approved |
SP‑080429 | 23.401 CR0222R3: | SA WG2 Chairman | Approved |
SP‑080430 | WID on Support of Personal Area Networks and Enhancements to Personal Network Management (PANEPNM) | Vodafone, Nortel | Approved |
SP‑080431 | CR to 22.011: PPAC restriction to UTRAN | NTT DoCoMo, KDDI, NEC, Panasonic, OKI | Revised in SP-080452 |
SP‑080432 | 22.011 CR0117R3 | Nokia Siemens Networks | Approved |
SP‑080433 | LS to GSMA SCaG on on SIM usage in M2M applications | TSG SA | Revised in SP-080450 |
SP‑080434 | 23.402 CR0261R4 | SA WG2 Chairman | Approved |
SP‑080435 | CR to 21.101 Rel-7: Corrections to list of Specs | MCC Specifications Manager | Approved |
SP‑080436 | LS on Guidance on HSPA VoIP Continuity Solution | TSG SA | Approved |
SP‑080437 | LS on NGN Interconnection work | TSG SA | Approved |
SP‑080438 | Response LS to TSG RAN on decision for NW interface option for ETWS support | TSG SA | Revised in SP-080440 |
SP‑080439 | LS on Transfer of OSA API work from 3GPP to OMA | TSG SA | Approved |
SP‑080440 | Response LS to TSG RAN on decision for NW interface option for ETWS support | TSG SA | Approved |
SP‑080441 | LS on freeze of stage 2 specifications of the Evolved Packet System in 3GPP | TSG SA | Approved |
SP‑080442 | Updated WID: MBMS support in EPS (was MBMS support in EPS for E UTRAN) | SA WG2 | Approved |
SP‑080443 | New WID on "Encoding formats, transport formats and media description signalling for interworking, QoE, and other enhancements to MTSI-MHI" | SA WG4 | Approved |
SP‑080444 | New WID on "Media Requirements for CS over IP based User Plane (CSoIP)" | SA WG4 | Approved |
SP‑080445 | New WID: LCS Control Plane Solution for EPS | SA WG2 | Approved |
SP‑080446 | WID on Network Improvements for Machine-type Communications (NIMTC) | SA WG1 | WITHDRAWN |
SP‑080447 | TR 32.819-200 Telecommunications management; Element management layer - Operation System Function (E-OSF) definition - for SA Approval | SA WG5 | Approved |
SP‑080448 | WID on User Data Convergence (UDC) | SA WG1 | Approved |
SP‑080449 | New WID on Enhanced Home NodeB / eNodeB (EHNB) | SA WG1 | Approved |
SP‑080450 | LS to GSMA SCaG on on SIM usage in M2M applications | TSG SA | Approved |
SP‑080451 | LS on documentation of TISPAN Rel-2 in 3GPP | TSG SA | Approved |
SP‑080452 | CR to 22.011: PPAC restriction to UTRAN | NTT DoCoMo, KDDI, NEC, Panasonic, OKI | Revised in SP-080453 |
SP‑080453 | CR to 22.011: PPAC restriction to UTRAN | NTT DoCoMo, KDDI, NEC, Panasonic, OKI | Approved |
SP‑080454 | Support Team Report | MCC Specifications Manager | Noted |
SP‑080455 | Work Plan Slide Review | MCC Work Plan Manager (AZ) | Noted |
page generated from database: 2024-07-20 12:15:34