Generations of Mobile Standards

stage-3 is required

  • Rel-20 Planning and Progress in TSG SA

    has a two-tier timeline, with 80% completion anticipated by June 2026, leading to a final freeze in September 2026. Stage-3 (protocol details)is targeted for March 2027, followed by the final ASN.1/OpenAPI freeze in June 2027. In SA1, which is dedicated...

  • Communication services (VoLTE/VoNR)

    id[tab_4kLL9Flm42]} WI Acronym WI Name WID 5GS_Ph1-IMSo5G IMS impact due to 5GS IP-CAN CP-180094 IMSProtoc9 IMS Stage-3 IETF Protocol Alignment CP-171098 eIMS5G_SBA Work Itemon SBA aspects of enhanced IMS to 5GC integration SP-190181 5G_SRVCC Single...

  • Rel-18 Status and Rel-19 Progress in TSG SA

    the Rel-18 deadlines by three months. Consequently, the Stage-2 functional freeze has been rescheduled to June 2023, the Stage-3 freeze deadline has been moved from December to March 2024, and the ASN.1/OpenAPI freeze deadline has been adjusted from...

  • Release 20

    has a two-tier timeline, with 80% completion anticipated by June 2026, leading to a final freeze in September 2026. Stage-3 (protocol details) is targeted for March 2027, followed by the final ASN.1/OpenAPI freeze in June 2027. In TSG SA Rel-20...

  • WG SA2 - Release 18 Update

    Rel-18 Study items are between 70% - 100% complete. SA2 plans to finish the Stage-2 normative work by Mar 2023. Rel-18 Stage-3 target freeze date is Dec 2023 and ASN.1/Code freeze target is Mar 2024.

  • Excellence Award

    Group 1 2015 Ricky Kaura CT WG1 - MM/CC/SM [lu] “In recognition of your positive nature and kind help and support to secure stage-3 progress and aim for completion of MCPTT in Rel-13. You took the responsibility, stepped up and helped out without...

  • Release 17 Update from SA2

    most of the Study items are over 95% complete. SA2 plans to finish the Stage-2 normative work by June 2021. Release-17 Stage-3 target freeze date is March 2022 and ASN.1/Code freeze target is June 2022. Further reading: More about SA2 at...

  • Optimizing media and radio signal processing for 5G

    techniques are already close to their theoretical limitations. Technical views and design approaches followed in the Stage-3 work of TSG SA WG 4, which integrates media codecs, radio access, and core network technologies into end-to-end multimedia...

  • Collaboration on LTE - WLAN Integration

    Integration with IPsec Tunnel (LWIP) Related 3GPP Specs: LWA Stage-2 high level description – TS 36.300, section 22A.1 Stage-3 data plane (PDCP) – various sections in TS 36.323 Stage-3 data plane (LWAAP) – TS 36.360 Stage-3 control plane (RRC) – various...

  • Excellence Awards for 2015 work

    At the same time Ricky Kaura - CT1 - was rewarded with his Excellance Award, in recognition of his efforts to ensure that Stage-3 work on MC-PTT was completed in Release 13. The technical leadership of 3GPP (the four TSG Chairmen) were presented with a...


Results 1 - 10 of 10