The 5G Standard

3GPP Work Item mapping to Change Requests


3GPP Work Item = 60030 (EDGE)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
02.34 A009 rev 1 EDGE on Supported Rates
03.10 A010 Introduction of EDGE channel codings into the specifications
03.20 A017 Introduction of EDGE variant of A5 algorithm
03.60 A116 rev 2 Tunnelling of Non-GSM Messages
03.64 A054 rev 2 Introduction of Enhanced GPRS (EGPRS)
03.64 A067 Correction for EGPRS
03.64 A068 Introduction of Incremental Redundancy between different coding schemes in EGPRS
03.64 A074 DTM+EGPRS
04.03 A006 rev 1 Introduction of compact logical channels
04.04 A004 SACCH modifiaction due to EDGE
04.04 A005 EGPRS
04.06 A014 Correction of LAPDm performance parameters for E-FACCH/F
04.06 A014 rev 1 Correction of LAPDm performance parameters for E-FACCH/F
04.08 A0371 rev 2 BCIE modifications due to EDGE
04.08 A0562 to 04.08 due to EDGE SMG2 EDGE WS
04.18 A003 rev 3 Non-GSM Broadcast Information
04.18 A004 Modification due to ECSD Asymmetry
04.18 A005 Fast power control
04.18 A006 rev 1 Compact Cell Reselection
04.18 A008 rev 1 EGPRS support on 04.18, Immediate Assignment and PDCH assignment.
04.18 A015 EDGE Compact and support for EGPRS in ANSI-136 networks
04.18 A038 rev 2 EGPRS COMPACT Cell Selection, Cell Bar Qualify 2
04.18 A056 rev 4 EGPRS TBF Establishment ofn CCCH
04.18 A063 rev 1 Alignment of 04.18 with 04.60 for EGPRS Downlink Assignments
04.18 A064 Support for packet pause procedure for mobile stations capable of non-GSM circuit operation
04.18 A065 COMPACT Cell Selection, Cell Bar Qualify 2 removal
04.18 A068 Emergency Call Handling in COMPACT
04.18 A097 rev 1 IA Rest Octets IE
04.18 A136 Support of 11 bits request reference in IA and IAR messages
04.18 A136 rev 1 Support of 11 bits request reference in IA and IAR messages
04.18 A139 Interpretation addition of CELL_BAR_QUALIFY_2 value
04.18 A140 DTM+EGPRS
04.18 A161 Enable several instances of SI18 and SI20
04.18 A162 Inclusion of Cell Bar Qualify 2 in the neighbour cell descriptions in SI19
04.18 A178 Multiblock allocation
04.21 A014 Introduction of EDGE channel codings into the specifications
04.22 A023 Introduction of EDGE
04.60 A366 rev 1 chapter 1-8
04.60 A367 chapter 9
04.60 A368 rev 1 chapter 10
04.60 A369 rev 2 chapter 11-12
04.60 A426 rev 4 Non-GSM Broadcast information
04.60 A439 rev 1 Handling of EGPRS PACKET CHANNEL REQUEST included in 04.60 chapters 1 - 8
04.60 A440 EGPRS support on 04.60, chapter 10
04.60 A441 rev 1 Compact Control channel
04.60 A442 rev 1 EDGE compact cell reselection
04.60 A443 Chapter 9 for EGPRS support
04.60 A444 EGPRS message and information elements changes in 04.60 chapters 11-12
04.60 A445 rev 1 Chapter 8 resegment bit clarification
04.60 A446 chapters 11-12 Link Quality Control Measurements
04.60 A453 rev 1 Improvements to Clause 9
04.60 A454 rev 1 Improvements to Clause 9
04.60 A455 rev 1 Improvements to Clause 9
04.60 A495 rev 3 Compact Cell Selection
04.60 A593 rev 2 EGPRS Incremental Redundancy modes MCS-5-7 and MCS-6-9 End-of-TBF MCS selection
04.60 A595 EGPRS Link Quality Measurements
04.60 A624 rev 6 MS RAC impacts on One Phase and Two Phase Access procedures
04.60 A654 Update of timer T3198
04.60 A694 Transmission of TLLI in each RLC data block when using MCS-7, 8, 9
04.60 A725 EGPRS ACK/NACK Description Correction
04.60 A726 TLLI Channel Coding Description
04.60 A727 rev 1 Indicate resent block in RLC/MAC header
04.60 A729 rev 1 Packet pause procedure for mobile stations capable of non-GSM circuit operation
04.60 A730 rev 1 COMPACT interference measurements
04.60 A751 rev 2 Frequency hopping of block ordering for COMPACT
04.60 A760 rev 3 Filtering for EGPRS LQC measurements
04.60 A798 Order of FBI/TI and E bits in RLC/MAC headers
04.60 A799 GPRS and EGPRS TBF modes for a single MS
04.60 A800 Clarification on the handling of BEP_PERIOD2
04.60 A801 Clarification on bitmap compression in ACK/NACK IE
04.60 A810 Error in introduction for PACKET DL ASSIGNMENT
04.60 A811 Inconsistency in PACKET TIMESLOT RECONFIGURE about window size
04.60 A813 Cell selection parameters in PSI3 for COMPACT
04.60 A817 Addition of Index and Count Variables for PSI6 and PSI7 messages
04.60 A820 Cell Bar Qualify 2 parameter messages
04.60 A828 CSN.1 coding corrections of PSI3 and PSI3bis
04.60 A837 rev 3 Bit order within EGPRS RLC data blocks and related editorial corrections
04.60 A841 Corrections of neighbour cell parameters in PSI3bis
04.60 A849 Clarifications on EGPRS measurements
04.60 A850 Correction on MS Radio Access Capabilities
04.60 A851 rev 1 Corrections on GPRS Cell Options
04.60 A860 rev 2 Multiplexing of GPRS and EGPRS MSs
04.60 A865 Clarification of definition of resent block bit (RSB)
04.60 A870 Clarification of PI bit usage during retransmission in combined RLC/MAC data blocks
04.60 A902 Octet Alignment of RLC data octets
04.60 A904 EGPRS editorial clarifications
04.60 A905 Addition of a NIB flag for COMPACT TBF allocation
04.60 A917 Description of ACCESS_BURST_TYPE parameter
04.60 A918 Correction of PSI6 / PSI7
04.60 A919 EGPRS clarification on RLC block retransmission
04.60 A919 rev 1 EGPRS clarification on RLC block retransmission
04.60 A920 Alignment of EGPRS quality parameter names with 05.08
04.60 A944 Bitmap generation
04.60 A945 Multiblock allocation
04.60 A946 RLC receive window
04.60 A947 RLC window size for EGPRS
04.60 A947 rev 1 RLC window size for EGPRS
04.60 A970 RLC protocol: Conditions for pre-emptive re-transmission
04.60 A970 rev 1 RLC protocol: Conditions for pre-emptive re-transmission
04.60 A971 RLC protocol: Definition of bitmap
04.60 A971 rev 1 RLC protocol: Definition of bitmap
04.60 A971 rev 2 RLC protocol: Definition of bitmap
04.60 A972 RLC protocol: Relation between parameters ES/P, V(Q), BOW, EOW and PBSN
04.60 A972 rev 1 RLC protocol: Relation between parameters ES/P, V(Q), BOW, EOW and PBSN
04.60 A973 RLC protocol: Some corrections to statements regarding BOW ,EOW and bitmap
04.60 A973 rev 1 RLC protocol: Some corrections to statements regarding BOW ,EOW and bitmap
04.60 A974 RLC protocol: Correction to a statement on the EGPRS receive state array
04.60 A974 rev 1 RLC protocol: Correction to a statement on the EGPRS receive state array
04.60 A975 RLC protocol: RLC Protocol: Correction to pre-emptive bit value
04.60 A975 rev 1 RLC protocol: RLC Protocol: Correction to pre-emptive bit value
04.60 A975 rev 2 RLC protocol: RLC Protocol: Correction to pre-emptive bit value
04.60 A976 Delete the redundant parameter PCCCH_TIMESLOT
04.60 A976 rev 1 Delete the redundant parameter PCCCH_TIMESLOT
04.60 B033 Clarification on Access Persistence Control for EGPRS PACKET CHANNEL REQUEST (R99)
04.60 B033 rev 1 Clarification on Access Persistence Control for EGPRS PACKET CHANNEL REQUEST (R99)
04.64 A070 rev 2 Tunnelling of non-GSM Messages
05.01 A018 rev 1 05.01 changes for ECSD FACCH
05.02 A046 rev 1 Introduction of 8PSK burst format
05.02 A046 rev 4 Introduction of 8-PSK burst format
05.02 A074 rev 1 05.02 changes for ECSD FACCH
05.02 A144 Correction of Figure D.4
05.02 A149 Correction of NIB parameters
05.02 A158 rev 1 COMPACT Frequency Hopping
05.03 A022 rev 1 Introduction of ECSD/EDGE in 05.03
05.03 A033 Correction of EGPRS channel coding
05.03 A039 Fast Inband Signalling: E-IACCH
05.03 A040 Clarification of stealing bits for MCS-1 to 4.
05.03 A041 Correction to the interleaving formula of MCS-8 case
05.03 A043 Correction of errors in coding schemes
05.04 A001 rev 1 Introduction of 8PSK for EDGE
05.04 A009 Correction of symbol period notation
05.04 A010 05.04-A010 Correction of Timing Alignment for GMSK and 8-PSK Signals (R99)
05.04 A011 05.04-A011 Correction of Timing Alignment for GMSK and 8-PSK Signals (R98)
05.04 A012 Correction of tail bits for 8PSK normal burst
05.05 A100 Output level dynamic operation for EDGE
05.05 A102 rev 1 Blocking requirements for EDGE MS and BTS receivers
05.05 A103 rev 1 Power classes for EDGE mobile stations
05.05 A104 rev 1 Modulation Accuracy for EDGE MS and BTS
05.05 A105 rev 1 Spectrum Mask for EDGE MS and BTS
05.05 A106 rev 1 High input level requirements for EDGE receivers
05.05 A108 rev 1 Output power for EDGE BTS
05.05 A114 rev 1 Output level Dynamic operation in EDGE
05.05 A115 EDGE blocking requirement for micro and pico-BTS
05.05 A117 rev 1 EDGE 850 MHz and 1900 MHz mixed mode
05.05 A118 rev 1 Frequency compensation requirements for EDGE receivers
05.05 A119 rev 2 Modulation accuracy for EDGE MS and BTS
05.05 A126 8-PSK requirements for GSM 400
05.05 A127 PCS 1900 MHz intermodulation requirements
05.05 A132 EDGE blocking requirement for micro and pico-BTS
05.05 A133 rev 1 Spurious emission in RX- and TX-band in other frequency bands
05.05 A154 rev 2 Completion of GSM 05.05 for EDGE and clean-up
05.05 A173 05.05-A173 Clarification of BTS output power capability with 8PSK (R99)
05.05 A173 rev 1 05.05-A173 rev 1 Clarification of BTS output power capability with 8PSK (R99)
05.05 A175 Tolerance of BTS output power levels
05.05 A175 rev 1 Tolerance of BTS output power levels
05.05 A177 Alignment of AM suppression requirements for PCS 1900 MS
05.05 A178 Testing of Blocking requirements for MXM 1900 BSS
05.05 A178 rev 1 Testing of Blocking requirements for MXM 1900 BSS
05.05 A178 rev 2 Testing of Blocking requirements for MXM 1900 BSS
05.05 A179 Testing of Intra BSS intermodulation attenation requirements for MXM 1900 BSS
05.05 A180 Alignment of AM suppression requirement for PCS 1900, MXM 1900, and PCS 1800 BTS
05.05 A183 Correction of Power vs Time mask for 8-PSK
05.05 A184 rev 1 Definition of MXM systems missing
05.05 A185 Testing of Intra BSS intermodulation attenuation requirements for MXM 850 BSS
05.05 A186 rev 1 Mixed Mode Systems Intermodulation Attenuation
05.05 A187 Alignment of AM-suppression requirements for MXM 1900 BTS with PCS 1900 BTS and MXM 850 BTS with GSM 850 BTS
05.05 A189 rev 1 Clarification of Origin Offset Suppression
05.05 A190 rev 1 Corrections to facilitate the interpretation
05.08 A085 rev 6 EDGE on the BCCH carrier
05.08 A147 rev 6 Fast Power Control for ECSD
05.08 A181 rev 2 Link Quality Control measurements for EGPRS
05.08 A249 Clarification of Cell Bar Qualify 2 parameter
05.08 A266 Fast inband signalling: E-IACCH
05.08 A268 EGPRS Link Quality measurements
05.08 A275 rev 1 COMPACT interference measurements
05.08 A280 rev 1 Clarification GPRS downlink transmission requirements
05.08 A281 rev 1 Correction of inconsistency in the handling of BEP_PERIOD2
05.08 A282 rev 2 Cell_Bar_Access_2 missing in 05.08
05.08 A283 rev 1 Clarifications on EGPRS measurements
05.08 A306 Measurement requirements for COMPACT MS in the case of multislot allocation
05.10 A054 EGPRS Classic to COMPACT BTS synchronisation
05.50 A008 EDGE 850 MHz and 1900 MHz mixed mode scenarios
05.50 A023 Align the Mixed-Mode IMD Test Bandwidth (annex U.2.3) with GSM 05.05 and GSM 11.21
07.01 A037 Introduction of EDGE channel codings into the specifications
07.02 A014 Introduction of EDGE
07.03 A011 Introduction of EDGE
08.08 A151 rev 2 to 08.08 due to EDGE
08.08 A152 rev 2 ECSD asymmetry
08.08 A230 Circuit pools for ECSD
08.18 A078 MS Radio Access Capability
08.20 A006 Introduction of EDGE channel codings into the specifications
08.20 A007 Asymmetric Channel coding
08.58 A035 to 08.08 due to EDGE
08.58 A036 rev 1 ECSD Asymmetry
08.58 A037 rev 1 Modification due to Fast Power Control for ECSD
08.60 A009 Asymmetrical Channel Codings for ECSD
09.07 A051 Introduction of EDGE channel codings into the specifications
09.18 A028 rev 1 Gs Interface Changes to Support Tunnelling of non-GSM Messages
10.59 0000 EDGE - Project schedule and open issues
11.10-1 A939 Introduction of EDGE Power Control test cases
11.10-1 A972 Introduction of EGPRS Transmitter tests for frequency error, power, ORFS and intermodulation attenuation.
11.10-1 A974 EGPRS Receiver tests
11.11 A111 rev 1 COMPACT Cell Selection
11.11 A112 COMPACT Cell Selection - Investigation Scan indicator for packet only systems
11.21 A117 rev 2 Changes in clause 1- 6 due to EDGE introduction
11.21 A119 rev 2 Modification EDGE TX test cases
11.21 A120 rev 2 EDGE RX test cases
11.21 A121 rev 1 Switching Transients for 8-PSK
11.21 A122 rev 1 EDGE TX-test cases and uncertainties
11.21 A123 rev 1 EDGE radio link management test cases
11.21 A125 rev 2 Changes in clause 7 due to EDGE and GSM850
11.21 A126 rev 2 New subclause 9.4.4 signal quality EGPRS
11.21 A128 Correction of acceptable measurement uncertainty
11.21 A129 rev 1 Missing values in table 19c
11.21 A131 rev 1 Changes in clause 7 due to EDGE and GSM 05.01
11.21 A132 rev 1 Correction of test case for Signal quality, EGPRS
11.21 A133 rev 1 Correction of spurious requirements in UMTS bands
11.21 A134 rev 1 Correction of Blocking and AM suppression test case in GSM11.21
11.21 A137 rev 2 Additions to facilitate test on MXM systems
11.21 A139 rev 1 BTS output power capability and requirements with 8PSK
11.21 A141 rev 1 Intermodulation Test Method for MXM-850/1900
11.21 A142 Relaxation of Power versus time
11.21 A147 Correction of error parameter in Table 15
11.21 A148 Testing of blocking requirements for MXM 1900 BTS
11.21 A149 Alignment of AM supression test for MXM 850/1900 normal BTS
11.21 A150 rev 1 Relaxed uncertainty for EVM
11.26 A011 rev 2 Repeater EDGE & GSM 400 test cases
23.034 0001 rev 2 due to asymmetry for ECSD
23.034 0002 Link Adaptation for ECSD
23.034 0003 Modifications to Stage 2 service description due to EDGE
23.034 0003 rev 2 Modifications to Stage 2 service des iption due to EDGE
24.008 0014 rev 1 due to asymmetry for ECSD
24.008 0028 rev 1 MS RADIO ACCESS CAPABILITY IE DUE TO EDGE
24.008 0049 rev 4 Support of 400 and 850 MHz band
24.008 0051 rev 2 Emergency Call Handling in Packet Only Networks
24.008 0063 rev 2 Mobile Station Classmark 850 and 1900 band included
24.008 0201 rev 1 COMPACT Mobile Station Interference Measurements Capability
24.008 0463 Clarification of 8-PSK power class coding
24.008 0464 Clarification of 8-PSK power class coding
24.008 0465 Clarification of 8-PSK power class coding
24.008 0510 Clarification on the EDGE parameters in the Mobile Station Classmark 3 IE
24.008 0510 rev 1 Clarification on the EDGE parameters in the Mobile Station Classmark 3 IE
24.008 1028 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1028 rev 1 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1029 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1029 rev 1 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1030 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1030 rev 1 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1031 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1031 rev 1 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1032 Description of 8-PSK capability on the uplink in MS Classmark 3
24.008 1032 rev 1 Description of 8-PSK capability on the uplink in MS Classmark 3
27.001 0002 Asymmetry in EDGE
27.001 0003 EDGE related Correction
27.007 0002 ECSD additions
27.007 0003 ECSD asymmetry
27.007 0006 ECSD AT command correction
29.007 0003 EDGE related Correction
29.007 0004 Asymmetry in EDGE
43.051 0030 Alignment with Physical Channel Definition in 45.002
44.006 0002 Correction of LAPDm performance parameters for E-FACCH/F
44.006 0002 rev 1 Correction of LAPDm performance parameters for E-FACCH/F
44.018 0013 Support of 11 bits request reference in IA and IAR messages
44.018 0013 rev 1 Support of 11 bits request reference in IA and IAR messages
44.018 0016 Interpretation addition of CELL_BAR_QUALIFY_2 value
44.018 0017 DTM+EGPRS
44.018 0046 Transfer of the N(SD) duplication avoidance protocol from GSM 04.18
44.018 0047 Transfer of the N(SD) duplication avoidance protocol from GSM 04.18
44.018 0065 Multiblock allocation
44.060 0059 Clarification on Access Persistence Control for EGPRS PACKET CHANNEL REQUEST
44.060 0059 rev 1 Clarification on Access Persistence Control for EGPRS PACKET CHANNEL REQUEST
45.001 0003 rev 1 Introduction of EPC channels
45.002 0020 rev 1 Introduction of EPC channels
45.003 0006 rev 1 Editorial changes due to the introduction of 8-PSK HR
45.003 0007 Channel coding for O-FACCH/H
45.003 0008 AMR signalling frames for O-TCH/AHS
45.004 0001 45.004-001 Correction of Timing Alignment for GMSK and 8-PSK Signals (Rel 4)
45.004 0002 Correction of tail bits for 8PSK normal burst
45.004 0003 Correction of tail bits for 8PSK normal burst
45.005 0002 Tolerance of BTS output power levels
45.005 0002 rev 1 Tolerance of BTS output power levels
45.005 0003 Alignment of AM suppression requirements for PCS 1900 MS
45.005 0004 Testing of Blocking requirements for MXM 1900 BSS
45.005 0004 rev 1 Testing of Blocking requirements for MXM 1900 BSS
45.005 0005 Testing of Intra BSS intermodulation attenuation requirements for MXM 1900 BSS
45.005 0006 Alignment of AM suppression requirement for PCS 1900, MXM 1900, and PCS 1800 BTS
45.005 0010 Correction of Power vs Time mask for 8-PSK
45.005 0011 rev 1 Definition of MXM systems missing
45.005 0012 Testing of Intra BSS intermodulation attenation requirements for MXM 850 BSS
45.005 0013 Alignment of AM-suppression requirements for MXM 1900 BTS with PCS 1900 BTS and MXM 850 BTS with GSM 850 BTS
45.005 0014 Mixed Mode Systems Intermodulation Attenuation
45.005 0016 rev 1 Clarification of Origin Offset Suppression
45.005 0018 rev 1 Corrections to facilitate the interpretation
45.008 0008 Measurement requirements for COMPACT MS in the case of multislot allocation
45.008 0059 Introduction of Enhanced Power Control
48.008 0018 Circuit pools for ECSD
51.010-1 0019 Addition of EDGE test cases to the applicability table
51.010-1 0020 Introduction of 8PSK test equipment measurement uncertainties in Annex 5
51.010-1 0021 COMPACT Signal Strength test case
51.010-1 0022 COMPACT Cell Selection and Re-selection
51.010-1 0023 EDGE Timing advance and absolute delay
51.010-1 0112 Addition of EGPRS Usable receiver input range test to the applicability table
51.010-1 0113 EGPRS Usable receiver user input range test
51.010-1 0172 EVM test equipment measurement uncertainties
51.010-1 0173 Introduction of the EGPRS Radio Signalling Test Cases numbering.
51.010-1 0174 EGPRS Power Versus Time Template for 8PSK modulation
51.010-1 0225 Blocking and spurious response
51.010-1 0226 Clarification of Origin Offset Suppression requirements
51.010-1 0227 EGPRS Test Cases for RR procedures on CCCH related to temporary block flow establishment
51.010-1 0228 EGPRS Test Cases for Downlink Transfer/Reestablishment
51.010-1 0322 Test of EGPRS RR Paging Procedures
51.010-1 0323 Test of EGPRS Medium Access Control (MAC) Protocol/ Fixed Allocation
51.010-1 0324 Addition of new EGPRS test cases for section 52.4 (Measurement reports and Cell change order procedures)
51.010-1 0325 S51.3 MAC/RLC Release ; TBF-Release
51.010-1 0326 Correction of Origin Offset Suppression requirements
51.010-1 0327 S 53 - EGPRS RLC testcases
51.010-1 0328 S52.3 EGPRS MAC Dynamic Allocation Testcases.
51.010-1 0557 Correction to section 51.1.1.3 - RR / Paging / on PCCCH for EGPRS service / extended paging with P-TMSI successful.
51.010-1 0558 Correction to sections 53.1.1.17, 53.1.1.19, 53.1.1.20 and 53.1.1.21 - Acknowledged Mode/ Uplink TBF.
51.010-1 0559 Correction to sections 53.1.2.8, 53.1.2.10, 53.1.2.12 and 53.1.2.13 - Acknowledged Mode/ Downlink TBF.
51.010-1 0677 Removal of Fixed Allocation in section 50.x - EGPRS Default Conditions, Message Contents and Macros.
51.010-1 0678 Removal of Fixed Allocation in section 51.x - EGPRS Paging, TBF establishment/release and DCCH related procedures.
51.010-1 0679 Removal of Fixed Allocation in section 52.x - EGPRS Test of Medium Access Control (MAC) protocol.
51.010-1 0680 Removal of Fixed Allocation in section 53.x - Test of EGPRS Radio Link Control (RLC) Protocol.
51.010-1 1012 51.010-1-1012 Uplink data transfer is triggered instead of GPRS Attach for clause 51.2.2.5 - Initiation of the packet access procedure / Request Reference - Rel-4
51.010-1 1013 51.010-1-1013 Uplink data transfer is triggered instead of GPRS Attach for clause 51.2.3.1 - Two-message assignment / Successful case - Rel-4
51.010-1 1014 51.010-1-1014 Removal of clause 51.2.4.2 - Single block packet access / Packet Measurement Report. - Rel-4
51.010-1 1015 51.010-1-1015 Removal of clause 51.3.5.1 - PDCH Release / Without TIMESLOTS_AVAILABLE. - Rel-4
51.010-1 1016 51.010-1-1016 Correction of Initial Conditions for clause 52.1.1.5 - EGPRS Packet Channel Request / Access type - Rel-4
51.010-1 1017 51.010-1-1017 Clarification of the MS multislot class to be used for clause 52.1.2.2.5.1 - Packet Downlink Assignment / Abnormal cases / Incorrect PDCH assignment - Rel-4
51.010-1 1018 51.010-1-1018 Clarification of the MS multislot class to be used for clause 52.3.1.1.8 - Dynamic Allocation / Uplink Transfer / Normal / Two uplink timeslots - Rel-4
51.010-1 1019 51.010-1-1019 Correction of PRE_EMPTIVE TRANSMISSION IE for clause 52.3.4 - Default message contents. - Rel-4
51.010-1 1020 51.010-1-1020 Removal of clause 52.1.2.2.3 - Packet Downlink Assignment / Frequency hopping. - Rel-4
51.010-1 1021 51.010-1-1021 Removal of clause 52.3.1.1.9 - Dynamic Allocation / Uplink Transfer / Normal / Frequency parameters. - Rel-4
51.010-1 1022 51.010-1-1022 Removal of clause 52.3.1.2.1 - Dynamic Allocation / Uplink Transfer / Abnormal / with random access. - Rel-4
51.010-1 1023 51.010-1-1023 Clarification of of the NC used in the PACKET CELL CHANGE ORDER in the Expected Sequence for clause 52.4.2.1.1 - Cell change order procedure / Uplink transfer / Normal case - Rel-4
51.010-1 1047 51.010-1-1047 Sec 53.1.2 Correction to Window Size used in the DL TBF Establishment Macro.
51.010-1 1048 51.010-1-1048 TC 53.1.2.13 Modify the corruption method used in the testcase.
51.010-1 1049 51.010-1-1049 TC 53.1.1.15 Changes to Coding Scheme used, BSN sequence and addition of optional steps.
51.010-1 1049 rev 1 51.010-1-1049 r1 TC 53.1.1.15 Changes to Coding Scheme used, BSN sequence and addition of optional steps.
51.010-1 1050 51.010-1-1050 TC 51.3.5.2 Changes to applicability of test steps and addition of Dl Dummy Control Blocks.
51.010-1 1051 51.010-1-1051 TC 51.2.3.9 Addition of optional steps to cater to different MS behaviour.
51.010-1 1052 51.010-1-1052 TC 53.1.1.8 Change to number of octets used in testcase.
51.010-1 1053 51.010-1-1053 TC 52.3.1.1.5 Addition of optional steps to cater to MS reaction time.
51.010-1 1054 51.010-1-1054 TC 53.1.1.10 Change to number of octets used in testcase.
51.010-1 1054 rev 1 51.010-1-1054 r1 TC 53.1.1.10 Change to number of octets used in testcase.
51.010-1 1055 51.010-1-1055 TC 53.1.1.17 Addition of optional steps to cater to MS reaction time.
51.010-1 1056 51.010-1-1056 TC 53.1.1.12 Addition of optional steps to cater to MS reaction time.
51.010-1 1066 51.010-1 Section 40 GPRS default conditions, message contents and macros
51.010-1 1069 51.010-1-1069 TC 51.2.3.2 Two-message assignment / Failure cases - Change to specific message contents
51.010-1 1071 51.010-1-1071 TC 51.3.5.2 correction of some steps
51.010-1 1071 rev 1 51.010-1-1169 r1 51.3.5.2 Correction of test procedure and expected sequence in order to clarify use of multiple timeslots
51.010-1 1073 51.010-1-1073 TC 52.1.1.6.3 should be corrected to take care of MS set to do PRACH in fixed way
51.010-1 1075 51.010-1-1075 TC 51.2.2.6 New Testcase added
51.010-1 1076 51.010-1-1076 TC 52.1.1.7 New Testcase added
51.010-1 1077 51.010-1-1077 Testcase 52.1.2.1.8.2.3 deleted and new Testcase 52.1.2.2.6 added
51.010-1 1077 rev 1 51.010-1-1077 r1 Testcase 52.1.2.1.8.2.3 deleted and new Testcase 52.1.2.2.6 added
51.010-1 1078 51.010-1-1078 TC 53.1.1.21 Addition of optional steps to cater to MS reaction time
51.010-1 1078 rev 1 51.010-1-1078 r1 TC 53.1.1.21 Addition of optional steps to cater to MS reaction time
51.010-1 1079 51.010-1-1079 TC 53.1.1.20 Addition of optional steps to cater to MS reaction time
51.010-1 1079 rev 1 51.010-1-1079 r1 TC 53.1.1.20 Addition of optional steps to cater to MS reaction time
51.010-1 1080 51.010-1-1080 TC 53.1.1.18 Addition of optional steps to cater to MS reaction time
51.010-1 1081 51.010-1-1081 TC 53.1.1.4 Window Size value in not relevant to testcase sequence
51.010-1 1082 51.010-1-1082 Testcase 53.1.1.4 should be done in transfer mode.
51.010-1 1082 rev 1 51.010-1-1082 r1 Testcase 53.1.1.4 should be done in transfer mode.
51.010-1 1083 51.010-1-1083 TC 53.1.1.6 CV calculation was wrong
51.010-1 1085 51.010-1-1085 TC 53.1.1.3 Addition of optional steps to cater to MS reaction time
51.010-1 1085 rev 1 51.010-1-1085 r1 TC 53.1.1.3 Addition of optional steps to cater to MS reaction time
51.010-1 1086 51.010-1-1086 52.1.2.1.10.1- testcase not testing EGPRS Multislot class
51.010-1 1087 51.010-1-1087 TC 51.3.1.2 correction of some steps
51.010-1 1087 rev 1 51.010-1-1087 r1 TC 51.3.1.2 correction of some steps
51.010-1 1091 51.010-1-1091 TC 52.3.2.1 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal
51.010-1 1092 51.010-1-1092 TC 53.1.2.16 Acknowledged Mode/ Downlink TBF/ Received Block Bitmap/ Compressed Bitmap Starting Colour Code
51.010-1 1094 51.010-1-1094 TC 53.1.2.10 Acknowledged Mode/ Downlink TBF/ Split RLC Data Block
51.010-1 1095 51.010-1-1095 TC 53.1.1.11 Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ Negative Acknowledgement
51.010-1 1095 rev 1 51.010-1-1095 r1 TC 53.1.1.11 Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ Negative Acknowledgement
51.010-1 1096 51.010-1-1096 TC 51.3.4.2 TBF Release / Downlink / Normal / Network initiated / Unacknowledged mode
51.010-1 1097 51.010-1-1097 TC 51.3.1.1 TBF Release / Uplink / Normal / MS initiated / Acknowledged mode
51.010-1 1098 51.010-1-1098 TC 51.2.3.8 One phase packet access / Contention resolution / 4 access repetition attempts
51.010-1 1098 rev 1 51.010-1-1098 r1 TC 51.2.3.8 One phase packet access / Contention resolution / 4 access repetition attempts
51.010-1 1099 51.010-1-1099 TC 51.2.5.1 Packet access rejection / wait indication
51.010-1 1100 51.010-1-1100 TC 52.1.2.1.9.2.2 : Deletion of steps 5 and 6.
51.010-1 1102 51.010-1-1102 New testcase 53.1.1.23 Acknowledged Mode/ Uplink TBF/ Interpretation of Compressed Bitmap
51.010-1 1102 rev 1 51.010-1-1102 r1 New testcase 53.1.1.23 Acknowledged Mode/ Uplink TBF/ Interpretation of Compressed Bitmap
51.010-1 1103 51.010-1-1103 New testcase 53.1.1.22 Acknowledged Mode/ Uplink TBF/ Recalculation of CV on TBC change
51.010-1 1105 CR.51.010-1-1105 TC 53.1.2.13 Acknowledged Mode/ Downlink TBF/ IR Operation
51.010-1 1105 rev 1 CR.51.010-1-1105 TC 53.1.2.13 Acknowledged Mode/ Downlink TBF/ IR Operation
51.010-1 1105 rev 2 CR.51.010-1-1105 TC 53.1.2.13 Acknowledged Mode/ Downlink TBF/ IR Operation
51.010-1 1133 51.010-1-1133 TC 14.18.7 Incremental Redundancy Performance
51.010-1 1133 rev 1 51.010-1-1133 TC 14.18.7 Incremental Redundancy Performance
51.010-1 1133 rev 2 51.010-1-1133 TC 14.18.7 Incremental Redundancy Performance
51.010-1 1134 51.010-1-1134 53.1.1.16 Acknowledged Mode/ Uplink TBF/ Retransmission/ Padding in the Data Field
51.010-1 1134 rev 1 51.010-1-1134 r1 53.1.1.16 Acknowledged Mode/ Uplink TBF/ Retransmission/ Padding in the Data Field
51.010-1 1135 51.010-1-1135 S50 EGPRS Default Conditions, Message Contents and Macros for the Higher Layer Testcases
51.010-1 1135 rev 1 51.010-1-1135r1xxx S50 EGPRS Default Conditions, Message Contents and Macros for the Higher Layer Testcases
51.010-1 1179 51.010-1-1179 Correction of Initial Conditions and Expected Sequence for clause 51.1.5.3 - RR / Paging / on CCCH for EGPRS service / paging reorganisation
51.010-1 1180 51.010-1-1180 Updates to allow the new Acces Type 'signalling' in clauses 51.2.2.1; 51.2.2.2 and 51.2.2.3 - Initiation of the packet access procedure
51.010-1 1181 51.010-1-1181 Alignment of the Expected Sequence for clause 52.1.2.2.4 - Packet Downlink Assignment / Response to Packet Polling
51.010-1 1182 51.010-1-1182 Steps 9 to 24 are made optional for K=1 and the wait indication value for K=2 has been changed for clause 52.3.3.3 - Dynamic Allocation / Resource reallocation / Reject
51.010-1 1183 51.010-1-1183 Alignment of GERAN#7 CR GP-012786 and correction in Specific Message Content for step 4 in clauses 52.5.5.1, 52.5.5.2 and 52.5.5.3 - Downlink Transfer / Reestablishment
51.010-1 1183 rev 1 51.010-1-1183 r1 Alignment of GERAN#7 CR GP-012786 and correction in Specific Message Content for step 4 in clauses 52.5.5.1, 52.5.5.2 and 52.5.5.3 - Downlink Transfer / Reestablishment
51.010-1 1184 51.010-1-1184 Setting pre-emptive bit to 0 in step 3 in clause 53.1.1.10 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ PENDING_ACK Blocks
51.010-1 1184 rev 1 51.010-1-1184 r1 Setting pre-emptive bit to 0 in step 3 in clause 53.1.1.10 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '0'/ PENDING_ACK Blocks
51.010-1 1185 51.010-1-1185 Correction of Conformance Requirement and Expected Sequence for clause 53.1.1.15 - Acknowledged Mode/ Uplink TBF/ Recalculation of CV on MCS change
51.010-1 1186 51.010-1-1186 Change of steps 8 and 10 of the Expected Sequence in clause 53.1.1.17 - Acknowledged Mode / Uplink TBF / Retransmission / Puncturing Scheme Cycle
51.010-1 1188 51.010-1-1188 Preventing of T3182 expiry in clause 53.1.1.9 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '1'
51.010-1 1190 51.010-1-1190 Changing of the data amount expression for section 53.1.1.x - Acknowledged Mode / Uplink TBF
51.010-1 1187 51.010-1-1187 Changing of Window Size in the Expected Sequence in order to avoid expiry of T3182 for clause 53.1.1.4 - Acknowledged Mode/ Uplink TBF/ Window Size/ Assigned Value
51.010-1 1187 rev 1 51.010-1-1187 r1 Changing of Window Size in the Expected Sequence in order to avoid expiry of T3182 for clause 53.1.1.4 - Acknowledged Mode/ Uplink TBF/ Window Size/ Assigned Value
51.010-1 1189 51.010-1-1189 Adding an uplink TBF in order to be able to test all the conformance requirements for´ clauses 53.1.2.3 and 53.1.2.4 - Acknowledged Mode / Downlink TBF / Window Size.
51.010-1 1191 New EGPRS test cases for verification of correct Access Type when EGPRS PACKET CHANNEL REQUEST is supported and when it is not supported in the cell. Clauses 52.6 - EGPRS Packet Access for signalling
51.010-1 1191 rev 1 New EGPRS test cases for verification of correct Access Type when EGPRS PACKET CHANNEL REQUEST is supported and when it is not supported in the cell. Clauses 52.6 - EGPRS Packet Access for signalling
51.010-1 1216 51.010-1-1216 TC 52.3.1.1.4 Use of Packet Uplink Assignment instead of Packet Timeslot reconfigure
51.010-1 1216 rev 1 51.010-1-1216 r1 TC 52.3.1.1.4 Use of Packet Uplink Assignment instead of Packet Timeslot reconfigure
51.010-1 1217 51.010-1-1217 TC 53.1.1.14 Addition of optional steps to cater to MS reaction time
51.010-1 1217 rev 1 51.010-1-1217 r1 TC 53.1.1.14 Addition of optional steps to cater to MS reaction time
51.010-1 1218 51.010-1-1218 TC 51.1.4.2 Modification to test steps 5, 6 and 7 to align with test purpose
51.010-1 1225 51.010-1-1225 Removal of redundant EGPRS USF-sensitivity tests
51.010-1 1227 51.010-1-1227 Addition of missing parameters for DL Power Control and clarification on the test requirement in 14.18.1
51.010-1 1229 51.010-1-1229 Clarification on required power level in 13.17.4, step b)
51.010-1 1235 51.010-1-1235 Changing the wait time in steps 5, 10 and 15 of the Expected Sequence for clause 51.1.1.4 - RR / Paging / on PCCCH for EGPRS service / paging reorganisation successful
51.010-1 1241 to TS51.010-1-1241 BS_CV_MAX value, as specified in section 50, are used instead for the EGPRS RLC tests in clause 53.x - Test of EGPRS Radio Link Control (RLC) Protocol.
51.010-1 1249 51.010-1-1249 14.7 - Relaxation of requirements for blocking signal for GSM 850 in range > 914 MHz to 12,75 GHz
51.010-1 1250 51.010-1-1250 53.1.1.16 - Deletion of redundant steps and correction of step references
51.010-1 1252 51.010-1-1252 53.1.1.20 - Core spec references corrected
51.010-1 1254 51.010-1-1254 53.1.1.21 - Sequence corrected to allow for all types of MCS switching, core spec references corrected
51.010-1 1261 51.010-1-1261 Testcase 52.1.1.1 needs to be done in transfer mode
51.010-1 1262 51.010-1-1262 Testcase 52.1.2.1.6 needs to be done in transfer mode
51.010-1 1262 rev 1 51.010-1-1262 r1 Testcase 52.1.2.1.6 needs to be done in transfer mode
51.010-1 1263 51.010-1-1263 Testcase 52.1.2.1.7 needs to be done in transfer mode
51.010-1 1265 51.010-1-1265 Addition of new testcases section 52.7
51.010-1 1266 51.010-1-1266 Addition of new testcases section 52.8
51.010-1 1274 51.010-1-1274 52.1.2.1.10.1 Clarification of conformance requirements, and consequent alterations to test procedure.
51.010-1 1285 51.010-1-1285 Correction of step 16 of Expected Sequence for clause 51.1.1.4 - RR / Paging / on PCCCH for EGPRS service / paging reorganisation successful.
51.010-1 1286 51.010-1-1286 Correction on reaction times for RLC Data Blocks for clauses 53.1.1.14 and 53.1.1.17 - Acknowledged Mode / Uplink TBF.
51.010-1 1290 51.010-1-1290 EGPRS specific additions to Sec 50
51.010-1 1290 rev 1 51.010-1-1290 r1 EGPRS specific additions to Sec 50
51.010-1 1291 51.010-1-1291 Sec: 52.4 - Addition of allocation of resources for UL data transfer
51.010-1 1292 51.010-1-1292 Sec: 51.3 - Addition of allocation of resources for UL data transfer
51.010-1 1293 51.010-1-1293 Sec 53.1.1.3 - Modification to the usage of Packet Timeslot Reconfigure and window size
51.010-1 1294 51.010-1-1294 Sec 51.3.1.2 - MS will not re-initiate Packet Access in Step 20.
51.010-1 1295 51.010-1-1295 Sec 52.5.5.2 - Testcase requires only One Cell
51.010-1 1296 51.010-1-1296 Sec 51.2.3.10 - PTCCH Access Bursts content should be 11-bit
51.010-1 1297 51.010-1-1297 Sec 53.1.1.5 - Addition of optional steps to cater to MS reaction time and correction of BSN expected.
51.010-1 1298 51.010-1-1298 Sec 52.3.1.1.4 - Packet Uplink Ack Nack shall not be sent on the activated PDCH in Step 30.
51.010-1 1299 51.010-1-1299 Sec 51.2.2.1 - The Activation of PDP Context need to be done only once.
51.010-1 1300 51.010-1-1300 Sec 53.1.2.18 - New testcase - Acknowledged Mode/ Downlink TBF/ Retransmission/Padding
51.010-1 1301 51.010-1-1301 Sec 52.3.3.1.2 - Correction to the PDP contexts activated in expected sequence.
51.010-1 1302 51.010-1-1302 Sec 51.2.2.3 - Request reference value check should cater for Egprs Packet Channel Request also.
51.010-1 1303 51.010-1-1303 Sec 53.1.2.3 and 53.1.2.4 - Polling for Egprs Downlink Ack/Nack shall be done before step 5.
51.010-1 1304 51.010-1-1304 Sec 53.1.1.11 - SS shall acknowledge all data blocks before Step 11.
51.010-1 1317 51.010-1-1317 52.3.1.2.2, 52.3.1.2.3 Correction to test cases 52.3.1.2.2 and 52.3.1.2.3
51.010-1 1341 51.010-1-1341 Sec 52.5.5.3 - Change in timing
51.010-1 1343 Corrections of the Peak Throughput Class and Maximum bit rate values for clause 50.5 – Test PDP Context.
51.010-1 1343 rev 1 Corrections of the Peak Throughput Class and Maximum bit rate values for clause 50.5 – Test PDP Context.
51.010-1 1344 Undo of the approved GERAN#12 changes for clause 51.2.5.1 - Packet access rejection / wait indication.
51.010-1 1345 Correction of Expected Sequence and Specific Message Content for clause 52.4.1.2 - Network Control measurement reporting / Idle mode / New cell reselection
51.010-1 1346 Deletion of clause 52.4.2.1.5 - Cell change order procedure / Uplink transfer / Failure cases / REJECT from the new cell and T3176 expiry
51.010-1 1348 Preventing of T3182 expiry in clause 53.1.1.9 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '1'
51.010-1 1349 Addition of Macro for downlink TBF establishment using ACCESS TYPE = signalling for section 53.2.2.
51.010-1 1350 Corrections on PACKET UPLINK ACK/NACK transmission timing and removal of T3198 in clause 53.1.1.x - Acknowledged Mode/ Uplink TBF
51.010-1 1358 Correction of Test Procedure and Expected Sequence for clause 52.1.2.1.10.2 - Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164.
51.010-1 1391 52.1.2.1.10.2 Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164
51.010-1 1392 52.1.2.1.9.2.1 Packet Uplink Assignment / Two phase access / Contention resolution / Expiry of timer T3168
51.010-1 1393 53.1.1.12 Acknowledged Mode/ Uplink TBF/ Retransmission/ Split RLC Data Block
51.010-1 1402 Update of testcases of section 52.1 to handle Mobiles using EPfor signalling procedure
51.010-1 1402 rev 1 51.010-1 Update of testcases of section 52.1 to handle Mobiles using EPCR for signalling procedure
51.010-1 1412 Sec: 52.4 - Addition of allocation of resource to send Packet Cell Change Failure
51.010-1 1412 rev 1 Sec: 52.4 - Addition of allocation of resource to send Packet Cell Change Failure
51.010-1 1412 rev 2 Sec: 52.4 - Addition of allocation of resource to send Packet Cell Change Failure
51.010-1 1414 Sec 51.2.3.8 - Correction to number of Packet Access initiation attempts
51.010-1 1414 rev 1 Sec 51.2.3.8 - Correction to number of Packet Access initiation attempts
51.010-1 1414 rev 2 Sec 51.2.3.8 - Correction to number of Packet Access initiation attempts
51.010-1 1415 Sec 51.3.1.1 - Introduction of Wait before sending Packet Uplink Ack/Nack
51.010-1 1416 Sec 51.3.1.2 - Correction to multislot classes checked.
51.010-1 1417 Sec 51.x and 52.x - Addition of check for EGPRS Packet Channel Request with Access Type 'Signalling'
51.010-1 1418 Sec 52.4.4.2 - Attach procedure need to be completed before sending Packet Measurement order.
51.010-1 1418 rev 1 Sec 52.4.4.2 - Attach procedure need to be completed before sending Packet Measurement order.
51.010-1 1418 rev 2 Sec 52.4.4.2 - Attach procedure need to be completed before sending Packet Measurement order.
51.010-1 1419 Sec 53.1.1.2 – Correction to BSN check in Step A12
51.010-1 1420 Sec 53.1.1.3 - Modification to the usage of Packet Timeslot Reconfigure and window size
51.010-1 1421 Sec 53.1.1.4 – Correction to verification of BSN sequence in Step 7
51.010-1 1422 Sec 53.1.2.12 – Correction to repetitio sequence in Step 4.
51.010-1 1423 Correction to CV calculation
51.010-1 1443 051.010 Addition of new testcases section 52.9
51.010-1 1444 testcase 52.1.2.2.5.1 Packet Downlink Assignment / Abnormal cases / incorrect PDCH assignment
51.010-1 1446 Correction of Expected Sequence for clause 52.4.1.3 - Network Control measurement reporting / Downlink transfer / Normal case
51.010-1 1471 Updates to assign GPRS or EGPRS TBF depending upon the use of CHANNEL REQUEST or EGPRS PACKET CHANNEL REQUEST in clauses 51.2.2.1
51.010-1 1472 Additional Macros to Sec 50
51.010-1 1487 52.3.2.1.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Multislot capabilities
51.010-1 1490 Clarification on test procedure of 14.18.6
51.010-1 1495 Corrections of Core Specification references for clause 51.1.5.1.2 - RR / Paging / on CCCH for EGPRS service / normal paging with IMSI successful.
51.010-1 1498 51.010-1-1498 Sec. 52.1.2.1.10.1 Packet Uplink Assignment / Abnormal cases / Incorrect PDCH assignment
51.010-1 1498 rev 1 51.010-1-1498 rev1 Sec. 52.1.2.1.10.1 Packet Uplink Assignment / Abnormal cases / Incorrect PDCH assignment
51.010-1 1501 CR.51.010-1-1501 Sec. 52.3.1.1.2 Change number of octets to perform Short Access
51.010-1 1505 51.010-1-1505 51.2.6.1/2 Specify PDP context 31 in initial conditions for RLC Acknowledged mode.
51.010-1 1505 rev 1 51.010-1-1505 rev1 51.2.6.1/2 Specify PDP context 31 in initial conditions for RLC Acknowledged mode.
51.010-1 1508 51.010-1-1508 53.1.1.5 Correction of guard timer and number of octets
51.010-1 1509 51.010-1-1509 53.1.1.20 Reduction of data amount, correction of RBBs and BSNs
51.010-1 1510 51.010-1-1510 53.1.1.17 Correction of ACK/NACK of BSNs in test sequence and reduction of uplink data
51.010-1 1511 51.010-1-1511 53.1.1.13 T3198 replaced by BS_CV_MAX block periods
51.010-1 1512 51.010-1-1512 53.1.1.14 RESEGMENT IE set to 1 in Packet Uplink Ack/Nack
51.010-1 1513 51.010-1-1513 53.1.1.9 Correction of Test Procedure and Expected Sequence to meet test purpose
51.010-1 1519 51.010-1-1519 Introduction of clarification notes to Section 51.1
51.010-1 1520 51.010-1-1520 TC 53.1.2.18 - Correction to BSN values in test procedure
51.010-1 1521 51.010-1-1521 New RLC testcase 53.1.1.25 - Acknowledged Mode/Uplink TBF/TBF Reallocation/Window Size
51.010-1 1521 rev 1 51.010-1-1521 rev1 New RLC testcase 53.1.1.25 - Acknowledged Mode/Uplink TBF/TBF Reallocation/Window Size
51.010-1 1522 51.010-1-1522 New RLC testcase 53.1.2.19 - Acknowledged Mode/Downlink TBF/TBF Reallocation/Window Size
51.010-1 1523 51.010-1-1523 TC 42.1.2.1.8.1.6 - Correction to BSN check in Step 13
51.010-1 1524 51.010-1-1524 TC 52.1.2.1.8.1.6 - Correction to BSN check in Step 13
51.010-1 1525 51.010-1-1525 TC 52.1.2.1.8.1.7 - Correction to BSN check in Step 10
51.010-1 1526 51.010-1-1526 TC 52.1.2.1.8.1.8 - Step re-numbering and introduction of waiting time.
51.010-1 1527 51.010-1-1527 Correction of Initial condition for testcases 51.2.5.3 and 51.2.5.4
51.010-1 1528 51.010-1-1528 Usage of Open Ended TBF instead of Close Ended TBF
51.010-1 1529 51.010-1-1529 Introduction of new RLC Unacknowledged mode testcases to Section 53
51.010-1 1530 51.010-1-1530 Renumbering of section 53.2
51.010-1 1531 51.010-1-1531 Removal of redundant Specific message contents from TC 51.1.5.1.2
51.010-1 1532 51.010-1-1532 TC 53.1.2.9 - Change expected sequence and Window Size.
51.010-1 1533 51.010-1-1533 TC 42.1.2.2.4 - Correction to Specific message contents.
51.010-1 1534 51.010-1-1534 TC 52.1.2.2.4 - Correction to Specific message contents.
51.010-1 1536 51.010-1-1536 TC 52.3.2.1.2 - Correction to Expected Sequence
51.010-1 1538 51.010-1-1538 Section 13.17.3 Clarification for invalid GAMMA_TN values
51.010-1 1541 51.010-1-1541 Section 52.3.1.1.2 - Incorrect message content in PACKET RESOURCE REQUEST step 6
51.010-1 1544 51.010-1-1544 Section 51.2.5.1 ? IMMEDIATE ASSIGNMENT content for step 7 only correct for EGPRS PACKET CHANNEL REQUEST case
51.010-1 1545 51.010-1-1545 Section 51.2.5.2 ? Incorrct specific message content IMMEDIATE ASSIGNMENT for step 6
51.010-1 1546 51.010-1-1546 Section 51.3.2.1 ? Incorrect reference to M bit; alternative macro for two phase access missing
51.010-1 1547 51.010-1-1547 Section 52.1.1.2 - Deletion of unused PICS statement
51.010-1 1548 51.010-1-1548 Section 52.1.1.3 - Deletion of unused PICS statement and specific message contents
51.010-1 1549 51.010-1-1549 Section 52.1.2.1.8.1.1 - Mirror CR to GP-012196 (GERAN #7) missing
51.010-1 1550 51.010-1-1550 Section 52.1.2.1.9.1 - Mirror CR for GP-012734 (GERAN #7) missing
51.010-1 1551 51.010-1-1551 Section 52.1.2.1.9.2.2 - Incorrect reference in expected sequence; Incorrect macro reference
51.010-1 1555 51.010-1-1555 Section 53.2.1 - PACKET UPLINK ASSIGNMENT message inappropriate for section 53.
51.010-1 1560 51.010-1-1560 Section 50.2.3 Default PACKET_UPLINK_ASSIGNMENT and PACKET DOWNLINK ASSIGNMENT messages
51.010-1 1561 51.010-1-1561 Section 52.3.2.1.2 RRBP value not matching to expected sequence
51.010-1 1561 rev 1 51.010-1-1561 rev1 TC 52.3.2.1.2 - Correction to Expected Sequence
51.010-1 1562 51.010-1-1562 Section 53.1.1.5 Incorrect sequence of optional steps in expected sequence
51.010-1 1563 51.010-1-1563 correction to testcase 52.1.2.1.9.2.2: Packet Uplink Assignment / Two phase access / Contention resolution / TLLI in Packet Resource Request message
51.010-1 1565 51.010-1-1565 correction to testcase 52.1.2.1.8.1.5: Packet Uplink Assignment / One phase access / Contention resolution / 3 or 4 access repetition attempts
51.010-1 1566 51.010-1-1566 Correction of amount of data to be triggered in testcase 51.3.1.3:TBF Release / Uplink / Normal / MS initiated / Channel coding change during countdown
51.010-1 1567 51.010-1-1567 Correction of amount of data to be triggered in testcase 53.1.1.2: Acknowledged Mode/ Uplink TBF/ Acknowledge State Variable V(A)
51.010-1 1569 51.010-1-1569 T3142 should be from 2 to 60 seconds in testcase 51.2.5.1 Packet access rejection / wait indication
51.010-1 1580 51.010-1-1580 15.8 EGPRS Timing advance and absolute delay
51.010-1 1589 51.010-1-1589 Changes in Attach Macro in 50.4.3.11, 50.3.4.12.
51.010-1 1590 51.010-1-1590 Removing the wait of 2 PSI1 repeat period in step 1; 30 sec in step 5,10 and 15; and addtion of a wait of time required for 64/SPLIT_PG_CYCLE multiframes in steps 5,10,15 of 51.1.1.4
51.010-1 1591 51.010-1-1591 51.1.5.3 - Adding the delay after the changes in SI
51.010-1 1592 51.010-1-1592 51.1.6 - Changes in the value Wait Indication given in Packet Access Reject.
51.010-1 1593 51.010-1-1593 Updates to assign GPRS or EGPRS TBF depending upon the use of CHANNEL REQUEST or EGPRS PACKET CHANNEL REQUEST in clauses 51.2.5.1
51.010-1 1594 51.010-1-1594 Changing steps 6 and 7 of the testcase 51.3.3
51.010-1 1595 51.010-1-1595 Adding EGPRS support to the testcase 52.1.1.1
51.010-1 1598 51.010-1-1598 Addition of new testcase 51.2.6.5
51.010-1 1599 51.010-1-1599 Addition of new testcases to the section 51.2.6
51.010-1 1601 51.010-1-1601 deletion of T3198 in testcase 51.3.1.1 TBF Release / Uplink / Normal / MS initiated / Acknowledged mode
51.010-1 1639 51.010-1-1639 Sending of PSI13 on PACCH in order to prevent SI refresh for clause 51.2.3.7 - One phase packet access / Contention resolution / Timer T3166
51.010-1 1640 51.010-1-1640 Clarification of step 10 if the Expected Sequence for clause 51.2.3.8 - One phase packet access / Contention resolution / 4 access repetition attempts.
51.010-1 1641 51.010-1-1641 Addition of optional step in Expected Sequence for clause 51.2.5.1 - Packet access rejection / wait indication.
51.010-1 1642 51.010-1-1642 Timer reference correction to testcase 52.1.2.1.10.2
51.010-1 1643 51.010-1-1643 Correction to 52.1.2.1.9.2.1
51.010-1 1643 rev 1 51.010-1-1643 rev1 Correction to 52.1.2.1.9.2.1
51.010-1 1644 51.010-1-1644 52.3.1.2.3 Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in unacknowledged mode
51.010-1 1645 51.010-1-1645 Correction to new downlink TBF assignment in step 6 in testcase 52.5.5.2
51.010-1 1646 51.010-1-1646 Correction of invalid frequency parameters condition in 52.5.5.3
51.010-1 1647 51.010-1-1647 Deletion of Specific Message Content for clause 52.1.1.3 - Packet Channel Request / Response to Packet Paging/Non-RR Connection Paging
51.010-1 1648 51.010-1-1648 Correction of SpecificaMessage Content for clause 52.1.2.1.7 - Packet Uplink Assignment / Most recently received Packet Uplink Assignment.
51.010-1 1649 51.010-1-1649 Correction of steps 5, 12 and 16 of the Expected Sequence for clause 52.3.2.1.1 - Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Successful
51.010-1 1650 51.010-1-1650 Deletion of clause 52.4 - Measurement reports and Cell change order procedures
51.010-1 1660 51.010-1-1657 Deletion of test case 52.1.1.1
51.010-1 1673 51.010-1-1673 Introduction of new testcases as section 52.3.2.3 - Dynamic Allocation / Abnormal cases / Incorrect Assignment
51.010-1 1674 51.010-1-1674 TC 53.1.1.25 - Correction to coding of Window size
51.010-1 1675 51.010-1-1675 TC 53.1.2.19 - Correction to timeslots allocated and coding of Window Size
51.010-1 1676 51.010-1-1676 TC 52.1.2.1.8.1.7 - Correction to the amount of data triggered
51.010-1 1684 51.010-1-1684 52.1.2.1.8.1.2 - Correction of calculation for N3104_MAX
51.010-1 1685 51.010-1-1685 52.1.2.1.8.1.4 - Correction of comment step7 regarding EGPRS PACKET CHANNEL REQUEST.
51.010-1 1686 51.010-1-1686 52.5.5.3 - Various Corrections to test sequence
51.010-1 1693 51.010-1-1693 51.1.2 RR / Paging / on PCCCH for circuit-switched services / paging successful
51.010-1 1694 51.010-1-1694 52.1.2.1.10.2 Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164
51.010-1 1694 rev 1 51.010-1-1694 rev1 52.1.2.1.10.2 Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164
51.010-1 1695 51.010-1-1695 Section 52.3.2.1.2 - RRBP value not matching expected sequence
51.010-1 1697 51.010-1-1697 53.1.2.4 Acknowledged Mode/ Downlink TBF/ Window Size/Assigned Value
51.010-1 1710 51.010-1-1710 Addition of new testcases to sec 51.3
51.010-1 1711 51.010-1-1711 52.1.1.3, 52.1.1.4 - In step 3, the channel on which the paging is transmitted is changed from PPCH to PAGCH.
51.010-1 1712 51.010-1-1712 Removal of the testcase 52.1.2.1.3.3
51.010-1 1713 51.010-1-1713 52.6.1 - changing mobile identity in paging request from TMSI to P-TMSI.
51.010-1 1714 51.010-1-1714 52.6.2 - changing mobile identity in paging request from TMSI to P-TMSI.
51.010-1 1717 51.010-1-1717 52.3.1.1.8 -- Changes in the applicabilty of the testcase 52.3.1.1.8
51.010-1 1726 51.010-1-1726 51.010-1; Identifying the number of iterations for the testcase 53.1.2.9
51.010-1 1726 rev 1 51.010-1-1726 rev1 51.010-1; Identifying the number of iterations for the testcase 53.1.2.9
51.010-1 1728 51.010-1-1728 Correction of Test Procedure and Expected Sequence for section 53.1.1.24 - Acknowledged Mode/ Uplink TBF/ Interpretation of PBSN
51.010-1 1731 51.010-1-1731 Section 51.1.6: Time constraints regarding WAIT_INDICATION not explicitely mentioned in expected sequence
51.010-1 1733 51.010-1-1733 Section 52.1.1.6.1 Correction Initial conditions
51.010-1 1734 51.010-1-1734 Section 52.1.1.7: PICS/PIXIT not needed
51.010-1 1735 51.010-1-1735 Section 52.1.2.1.3.1 Correction of Initial conditions
51.010-1 1736 51.010-1-1736 Section 52.1.2.1.6 ? PSI2 settings to use same frequency for PBCCH and PCCCH
51.010-1 1737 51.010-1-1737 Section 52.1.2.1.7: PICS/PIXIT not needed
51.010-1 1751 51.010-1-1751 Section 53.1.1.7 Inclusion of optional steps to match number of uplink blocks sent
51.010-1 1752 51.010-1-1752 Section 53.1.1.9 Optional steps to consider blocks already scheduled to L1 for UL transmission
51.010-1 1753 51.010-1-1753 Section 53.1.1.18 Correction of expected BSN for test run using MCS-6
51.010-1 1754 51.010-1-1754 Section 53.1.2.1 Removal of TIMESLOT_ALLOCATION = '00000010'
51.010-1 1755 51.010-1-1755 Section 53.1.2.2 Removal of TIMESLOT_ALLOCATION = '00000010'
51.010-1 1757 51.010-1-1757 Section 53.1.2.16 Removal of TIMESLOT_ALLOCATION = '00000010'
51.010-1 1761 51.010-1-1761 Section 42.1.2.1.7 PICS/PIXIT not needed
51.010-1 1762 51.010-1-1762 Section 52.1.2.1.9.1 Removal of close ended TBF missing
51.010-1 1763 51.010-1-1763 Section 52.8.1.1 Corrections to expected sequence
51.010-1 1763 rev 1 51.010-1-1763 rev1 Section 52.8.1.1 Corrections to expected sequence
51.010-1 1764 51.010-1-1764 Section 52.8.1.12 Correction of logical channel for sending PACKET UL ASSIGNMENT (PBCCH not present case)
51.010-1 1765 51.010-1-1765 Section 53.1.1.3 Optional steps needed to consider blocks already scheduled in the MS's buffer
51.010-1 1771 51.010-1-1771 52.1.2.1.8.2.1 - Correction to initial conditions of system simulator
51.010-1 1782 51.010-1-1782 TC 52.1.2.1.10.1 Packet Uplink Assignment / Abnormal cases / Incorrect PDCH assignment
51.010-1 1783 51.010-1-1783 TC 52.1.2.1.9.2.3 Packet Uplink Assignment / Two phase access / Contention resolution / TLLI mismatch
51.010-1 1800 51.010-1-1800 Section 52.8.1.6 Correction of expected sequence
51.010-1 1800 rev 1 51.010-1-1800 rev1 Section 52.8.1.6 Correction of expected sequence
51.010-1 1839 Addition of a delay of 6 blocks in step 9.
51.010-1 1840 Changing the Channel on which the PACKET DOWNLINK ASSIGNMENT is sent, from PCCCH to PPCH.
51.010-1 1841 Changing the channel on which the IMMEDIATE ASSIGNMENT for the downlink TBF is sent from AGCH to PCH.
51.010-1 1857 Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164.
51.010-1 1860 Perform test during Attach to ensure the MS will attempt the packet access after T3146 expires
51.010-1 1861 Assigning Window Size in {Downlink TBF establishment}
51.010-1 1863 Set BS_CV_MAX to 1 in initial conditions.
51.010-1 1865 Allow 2-phase access
51.010-1 1865 rev 1 MS may make two-phase access
51.010-1 1870 Test case 51.3.2.2 does not allow for the MS under test to send a PACKET UPLINK DUMMY CONTROL BLOCK.
51.010-1 1870 rev 1 Test case 51.3.2.2 does not allow for the MS under test to send a PACKET UPLINK DUMMY CONTROL BLOCK.
51.010-1 1871 Modification to Expected Message Sequence to cater to all iterations
51.010-1 1872 Allowing uncompressed bitmap to be present in EGPRS Packet Downlink Ack/Nack
51.010-1 1873 Correction to specific message contents of Packet Timeslot Reconfigure message (1st execution)
51.010-1 1875 Cell update need not be explicit in case of acknowledged mode RLC
51.010-1 1875 rev 1 Cell update need not be explicit in case of acknowledged mode RLC
51.010-1 1876 Resources need to be allocated to the MS to perform Cell Update
51.010-1 1876 rev 1 Resources need to be allocated to the MS to perform Cell Update
51.010-1 1896 51.010-1 Section 52.1.2.1.8.1.8 Missing PACKET DOWNLINK DUMMY CONTROL BLOCK
51.010-1 1913 51.010-1 Section 53.1.1.9 Correction of test procedure.
51.010-1 1914 51.010-1 Section 53.1.1.13 Correction of test procedure.
51.010-1 1914 rev 1 51.010-1 Section 53.1.1.13 Correction of test procedure.
51.010-1 1915 51.010-1 Section 53.1.1.18 Correction of test procedure.
51.010-1 1916 51.010-1 Section 53.1.1.19 Correction of test procedure.
51.010-1 1916 rev 1 51.010-1 Section 53.1.1.19 Correction of test procedure.
51.010-1 1916 rev 2 Correction of test procedure.
51.010-1 1917 51.010-1 Section 53.1.1.20 Correction of test procedure.
51.010-1 1921 Correction to testcase 53.1.2.3
51.010-1 1958 53.1.1.7 – Correction to Expected Sequence
51.010-1 1959 53.1.1.9 – Step numbering corrections
51.010-1 1969 51.010-1 51.3.1.2 TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode.
51.010-1 1970 51.010-1 52.8.1.2 One phase access/ PBCCH present / CONTENTION_RESOLUTION_TLLI / Contention resolution / Counter N3104
51.010-1 1971 51.010-1 53.1.1.22 – wrong requirement check step 12
51.010-1 1971 rev 1 51.010-1 53.1.1.22 – wrong requirement check step 12
51.010-1 1978 MS may make two-phase access
51.010-1 1978 rev 1 MS may make two-phase access
51.010-1 1978 rev 2 51.2.3.11 MS may make two-phase access
51.010-1 1984 53.1.1.3 - Editorial Correction to Specific message contents
51.010-1 1987 51.2.3.10 - Changing the frequency of USF allocation to MS
51.010-1 1987 rev 1 51.2.3.10 - Changing the frequency of USF allocation to MS
51.010-1 1987 rev 2 51.2.3.10 - Changing the frequency of USF allocation to MS
51.010-1 1988 52.3.3.2.2, 52.3.3.3 - Allocating USF in order to allow the Mobile to transmit Packet Resource Request.
51.010-1 1988 rev 1 52.3.3.2.2, 52.3.3.3 - Allocating USF in order to allow the Mobile to transmit Packet Resource Request.
51.010-1 1990 52.3.3.2.1 - Allocating USF in order to allow the Mobile to transmit Packet Resource Request and Correction of some steps.
51.010-1 1990 rev 1 52.3.3.2.1 - Allocating USF in order to allow the Mobile to transmit Packet Resource Request and Correction of some steps.
51.010-1 1992 53.1.1.18 - Changing the number iterations at Step 9,14,19,24,29, 34, 39, 44 and 49
51.010-1 2047 51.010-1 Section 53.1.1.9 Correction of test procedure
51.010-1 2049 51.010-1 Section 53.1.1.18 Correction of test procedure
51.010-1 2051 51.010-1 52.3.1.2.3 - Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in unacknowledged mode
51.010-1 2115 Correction to specific message contents of Packet Timeslot Reconfigure message (1st execution)
51.010-1 2116 Increase of amount to be triggered for testcases  51.3.2.1 and 51.3.2.2
51.010-1 2116 rev 1 Increase of amount to be triggered for testcases  51.3.2.1 and 51.3.2.2
51.010-1 2142 Correction to specific message contents of Packet Timeslot Reconfigure message (1st execution) (revisited)
51.010-1 2144 Correction to Initial Conditions of System Simulator
51.010-1 2157 Editorial Change to step numbering.
51.010-1 2159 Modify Initial Conditions: MS to be GPRS attached/in Packet Idle mode, PDP context 31 established.
51.010-1 2163 Correction to PICS statement to use EGPRS Multislot Class
51.010-1 2163 rev 1 Correction to PICS statement to use EGPRS Multislot Class
51.010-1 2164 Removal of Wait of BS_CV_MAX block periods
51.010-1 2165 Correction to the type of allocation in Packet Uplink Assignments in Test sequence
51.010-1 2206 Section 51.1 Consideration of Transfer non-DRX mode period
51.010-1 2207 Section 51.2.3.10 Incorrect step references
51.010-1 2208 Section 51.2.3.11 Incorrect step references
51.010-1 2209 Section 51.3.6.1 Correction of requirement check
51.010-1 2210 Section 51.3.6.2 Optional steps added and some further corrections
51.010-1 2211 Section 51.3.6.3 Optional steps added and some further corrections
51.010-1 2213 Section 52.3.3.1.3 Check that only one LLC PDU is transmitted
51.010-1 2214 Section 52.3.3.2.2 Step 6A of expected sequence removed
51.010-1 2215 Section 53.1.1.3 Number of octets changed in expected sequence
51.010-1 2216 Section 53.1.1.13 Correction of test procedure.
51.010-1 2216 rev 1 Section 53.1.1.13 Correction of test procedure.
51.010-1 2220 Section 52.5.5.3 Correction of PSI2 parameter settings
51.010-1 2220 rev 1 Section 52.5.5.3 Correction of PSI2 parameter settings
51.010-1 2229 TC 51.3.2.1 does not allow delay for the MS to be ready to transmit RLC block
51.010-1 2278 Editorial Change to step numbering and modifcation to the applicability of certain steps.
51.010-1 2305 51.010-1 Section 53.1.1.13 Correction of test procedure.
51.010-1 2305 rev 1 51.010-1 Section 53.1.1.13 Correction of test procedure.
51.010-1 2305 rev 2 51.010-1 Section 53.1.1.13 Correction of test procedure.
51.010-1 2330 051.010-1 Addition of new Extended Uplink Testcases 51.3.6.6,51.3.6.7 and 51.3.6.8
51.010-1 2330 rev 1 051.010-1 Addition of new Extended Uplink Testcases 51.3.6.6,51.3.6.7 and 51.3.6.8
51.010-1 2334 52.3.3.2.1 - Downlink Dummy control block to be sent to receive Resource request before step 9.
51.010-1 2337 52.3.1.1.8 Dynamic Allocation / Uplink Transfer / Normal / Two uplink timeslots
51.010-1 2454 51.010-1 Section 51.3.6.8 - Extended Uplink TBF / Cell Change while in Extended Uplink/ With Packet Neighbouring Cell Data - PSI 14 content changed
51.010-1 2457 51.010-1 Section 53.1.1.18 - EGPRS Acknowledged mode / Uplink TBF / Link Adaptation Procedure for retransmission - Correction of test procedure.
51.010-1 2458 51.010-1 Section 53.1.2.3 Correction of test procedure.
51.010-1 2490 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Multislot capabilities
51.010-1 2491 Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in acknowledged mode
51.010-1 2491 rev 1 Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in acknowledged mode
51.010-1 2492 Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in unacknowledged mode
51.010-1 2492 rev 1 Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in unacknowledged mode
51.010-1 2494 Acknowledged Mode/ Downlink TBF/ Window Size/ Default Value
51.010-1 2494 rev 1 Acknowledged Mode/ Downlink TBF/ Window Size/ Default Value
51.010-1 2513 Correction of test procedure.
51.010-1 2513 rev 1 Correction of test procedure.
51.010-1 2765 51.1.1.4: Correction to page mode in step 14
51.010-1 2767 52.3.2.1.2: Corrections to step references and timings
51.010-1 2770 51.2.x - Allow for two phase access.
51.010-1 2770 rev 1 51.2.x - Allow for two phase access.
51.010-1 2771 52.1.2.1.2 - Allow for two phase access
51.010-1 2794 13.17.2 Frequency error under multipath and interference conditions
51.010-1 2795 13.17.4 Output RF spectrum in EGPRS configuration
51.010-1 2796 14.18 EGPRS receiver tests
51.010-1 2804 51.010-1 GPRS_RESELECT_OFFSET of cell B changed in 52.3.1.2.2 and 52.3.1.2.3 changed
51.010-1 2808 051.010 section 50 PACKET UL/DL ASSIGNMENT and PACKET TIMESLOT RECONFIGURE should not have frequency parameters present in case MS is DTM mode.
51.010-1 2904 rev 1 051.010-1 2904: Correction to testcases 51.3.6.8,51.3.6.9 and 51.3.6.10
51.010-1 2908 51.2.3.9 - Clarify optional steps
51.010-1 2919 52.1.2.1.3.1 - Allow for two phase access
51.010-1 2920 53.1.2.17 - Allowing uncompressed bitmap present along with compressed bitmap in EGPRS packet Downlink Ack/Nack description.
51.010-1 3004 rev 1 52.1.1.4 Packet Channel Request / Response to Packet Paging/RR Connection Paging
51.010-1 3005 rev 1 52.1.2.1.9.3 Packet Uplink Assignment / Two phase access / Radio Access Capabilities
51.010-1 3039 52.8.1.x. - Handling of MS requesting two phase access.
51.010-1 3040 52.8.1.11 - Change of channel type from PAGCH to PACCH for sending Packet Uplink Assignment during packet transfer mode.
51.010-1 3041 52.8.1.12 - Change of channel type from PRACH to RACH for EP.
51.010-1 3046 51.3.6.8 Extended Uplink TBF / Cell Change while in Extended Uplink / With Packet Neighbouring Cell Data
51.010-1 3053 51.3.6.9 TBF Release / Extended Uplink / Change of RLC mode / Normal release
51.010-1 3056 53.1.1.19 EGPRS Acknowledged mode / Uplink TBF / Link Adaptation Procedure for initial transmission
51.010-1 3059 52.3.1.2.2 Dynamic Allocation / Uplink Transfer / Abnormal with cell reselection in acknowledged mode
51.010-1 3065 13.17.3 Change to use restricted interslot dynamic range for multislot uplink configurations
51.010-1 3097 51.010-1-3097 Section 53.1.1.24 - Correction of test procedure.
51.010-1 3098 51.010-1-3098 Section 53.1.1.25 - Correction of test procedure.
51.010-1 3117 051.010-1 Section 52.9.2.1.2 Extended Dynamic Allocation / Uplink Transfer / Normal / USF_GRANULARITY = 4 blocks
51.010-1 3118 rev 1 051.010-1 Section 52.9.2.1.4 Extended Dynamic Allocation / Uplink Transfer / Normal / PACCH operation in downlink
51.010-1 3120 rev 1 51.010-1 Correction to sections 52.6.3 and 52.6.4 (EGPRS Packet Access for signalling / PCCCH case)
51.010-1 3122 051.010-1 Section 51.3.6.9 TBF Release / Extended Uplink / Change of RLC mode / Normal release
51.010-1 3134 051.010-1 Section 52.3.3.3 - Peak Throughput Class for MS supporting SMS over EGPRS
51.010-1 3138 051.010-1 Section 52.9.2.1.4 Extended Dynamic Allocation / Uplink Transfer / Normal / PACCH operation in downlink
51.010-1 3140 051.010-1 Section 51.3.1.2 TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode
51.010-1 3140 rev 1 051.010-1 Section 51.3.1.2 TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode
51.010-1 3142 051.010-1 Section 51.2.5.3 Packet access rejection / Interpretation of Extended RA i / Correct value of Extended RA i
51.010-1 3142 rev 1 051.010-1 Section 51.2.5.3 Packet access rejection / Interpretation of Extended RA i / Correct value of Extended RA i
51.010-1 3153 Removal of TC53.1.1.5 from TS 51.010-1
51.010-1 3176 51.010-1-3176 cl. 13.17.4 - Change of measurement window to eliminate test system variations
51.010-1 3192 51.3.6.8 - All Packet System Information for Cell B is exchanged to Packet Downlink Dummy Control Block on PBCCH. The data trigger at Step1 is reduced to 1200 octets
51.010-1 3192 rev 1 51.3.6.8 - All Packet System Information for Cell B is replaced by Packet Downlink Dummy Control Block on PBCCH. The data trigger at Step1 is reduced to 1200 octets
51.010-1 3197 51.3.6.6, 51.3.6.7, 51.3.6.8, 51.3.6.9, 51.3.6.10 – EGPRS Test Cases incorrectly refer to GPRS messages and values.
51.010-1 3198 53.1.1.24 - Change the no.of repetitions of steps 23 & 24 to 10 instead of 9.
51.010-1 3204 51.2.2.2 – Handling of timer T3146
51.010-1 3244 22.8 corrections to the test procedure
51.010-1 3247 14.18.3 corrections to the test procedure
51.010-1 3256 13.17.1 removal of vibration condition
51.010-1 3267 051.010-1 53.1.1.25 Acknowledged Mode/ Uplink TBF/ TBF Reallocation/Window Size
51.010-1 3299 15.8 – Clarify Coding Scheme in Procedure step g; correct typographical errors
51.010-1 3328 26.18.1 new - Control of dynamic ARFCN mapping with SI14 and SI15
51.010-1 3347 22.8 change to verdict calculation and correction
51.010-1 3350 Section 53.1.1.5 - Delete from TS 51.010-1
51.010-1 3360 051.010-1 51.3.3 TBF Release / Uplink / Network initiated / Abnormal release
51.010-1 3402 Section 51.2.3.2 – Second Immediate Assignment message removal in step 7
51.010-1 3443 51.2.2.2 - Handling of timer T3146
51.010-1 3444 51.2.2.4 - Handling of timer T3146
51.010-1 3446 51.3.6.9 - Handling of processing delay of new LLC PDU
51.010-1 3447 rev 1 53.1.2.3 – Correction in specific message contents of PACKET TIMESLOT RECONFIGURE in Step 15.
51.010-1 3463 22.8– correction to test procedure
51.010-1 3467 Correction of applied frequency ranges in TC 13.17.4
51.010-1 3495 13.17.4 - Restriction of ARFCN channels used for GSM 900 Band
51.010-1 3496 13.17.4 - Change of measurement window
51.010-1 3503 52.3.3.1.1 – Correction in step 13 to handle the possible Packet Resource Request from MS.
51.010-1 3533 22.9 EGPRS - Independence of TS Power Control, reduced interslot dynamic range
51.010-2 0002 Addition of EDGE test cases to the applicability table
51.010-2 0010 Addition of new EGPRS test cases for section 51.3 (TBF Release)
51.010-2 0011 Addition of new EGPRS test cases for section 52.4 (Measurement reports and Cell change order procedures)
51.010-2 0012 Applicability table for EGPRS RR Paging Procedures
51.010-2 0013 Applicability table for EGPRS Medium Access Control (MAC) Protocol/ Fixed Allocation
51.010-2 0014 Addition of new EGPRS test cases for section 53 (EGPRS RLC Testcases)
51.010-2 0015 Addition of new EGPRS test cases for section 52.3 (EGPRS MAC Dynamic Allocation)
51.010-2 0053 Removal of EGPRS Fixed Allocation tests (52.2.x) for R99 and Rel-4 -.
51.010-2 0074 51.010-2-074 Removal of 5 EGPRS test cases from Annex B, Table B.1. - Rel-4
51.010-2 0082 51.010-2-082 Update of applicability table
51.010-2 0087 51.010-2-087 Changed the name of clause 51.2.2.3.
51.010-2 0097 51.010-2-097 Addition of 4 new EGPRS test cases.
51.010-2 0100 51.010-2-100 Update of applicability table
51.010-2 0100 rev 1 51.010-2-100 r1 Update of applicability table
51.010-2 0100 rev 2 51.010-2-100 r2 Update of applicability table
51.010-2 0120 51.010-2-120 Modification of Applicability Table
51.010-2 0127 51.010-2-127 Deletion of clause 52.4 from Table B.1
51.010-2 0128 51.010-2-1128 Deletion of test case 52.1.1.1 from Table B.1
51.010-2 0134 51.010-2-134 Modification to Applicability Table due to addition of new testcases in 51.010-1
51.010-2 0180 Correction of various Multislot Selection Expressions in Annex B, Table B.1
51.010-2 0180 rev 1 Correction of various Multislot Selection Expressions in Annex B, Table B.1
51.010-2 0300 Removal of TC53.1.1.5 from table B1.
51.010-2 0326 Section 53.1.1.5 - Delete from table B1.
51.021 0001 Clarification of output power measurement in 8-PSK

page generated from database: 2024-05-13 07:42:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links