The 5G Standard

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 05.50

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
A004 - D R96 5.1.0 5.1.1 Correction of terminology smg-23 97‑769 approved SMG2 SMG2-23 290/97 agreed 1997‑10‑08 ASCI_R96, RGSM -
A006 - B R98 6.0.2 - Pico BTS Scenarios (background to the previous two CRs) smg-26 98‑0389 postponed SMG2 SMG2-26 177/98 agreed 1998‑06‑23 PicoBTS CR was postponed at s26 and approved at s28
A008 - B R99 7.1.0 8.0.0 EDGE 850 MHz and 1900 MHz mixed mode scenarios smg-30 P‑99‑590 approved SMG2 - 2‑99‑A09 agreed EDGE See also: 05.05
A009 - B R99 7.1.0 8.0.0 Addition of GSM 400 system scenarios into GSM 05.50 smg-30 P‑99‑583 approved SMG2 - 2‑99‑A71 agreed GSM_400 -
A010 - F R98 7.1.0 7.2.0 AMR performance simulation smg-30 P‑99‑579 approved SMG2 - 2‑99‑919 agreed AMR -
A011 1 B R99 8.0.0 8.1.0 8-PSK scenarios in GSM 05.50 smg-31 P‑00‑091 approved SMG2 01/00 2‑00‑458 agreed 2000‑02‑13 EDGE-Layer1 -
A012 1 C R98 7.2.0 7.3.0 Background information for equirements for TOA LMU smg-31 P‑00‑084 approved SMG2 01/00 2‑00‑382 agreed 2000‑02‑13 LCS originated in T1P1.5
A013 1 A R99 8.0.0 8.1.0 Background information for equirements for TOA LMU smg-31 P‑00‑084 approved SMG2 01/00 2‑00‑383 agreed 2000‑02‑13 LCS originated in T1P1.5
A016 - C R97 6.0.2 6.1.0 Update of GPRS background information smg-31 P‑00‑081 approved SMG2 01/00 2‑00‑411 agreed 2000‑02‑13 GPRS -
A017 - A R98 7.2.0 7.3.0 Update of GPRS background information smg-31 P‑00‑081 approved SMG2 01/00 2‑00‑412 agreed 2000‑02‑13 GPRS -
A018 - A R99 8.0.0 8.1.0 Update of GPRS background information smg-31 P‑00‑081 approved SMG2 01/00 2‑00‑413 agreed 2000‑02‑13 GPRS -
A019 - C R98 7.2.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P‑00‑063 postponed T1P1 - - 2000‑02‑16 LCS -
A020 - C R99 8.0.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P‑00‑064 postponed T1P1 - - 2000‑02‑16 LCS -
A021 - C R98 7.3.0 7.4.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-219 approved SMG2 S2-35 560/00 agreed 2000‑04‑13 LCS -
A022 - A R99 8.1.0 8.2.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-219 approved SMG2 S2-35 561/00 agreed 2000‑04‑13 LCS -
A023 - F R99 8.2.0 - Align the Mixed-Mode IMD Test Bandwidth (annex U.2.3) with GSM 05.05 and GSM 11.21 GP-02 GP-000717 postponed G1 G1-02 GP‑000717 agreed 2000‑11‑14 EDGE -

page generated from database: 2024-05-13 07:42:51