CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - F Rel-5 5.4.0 - - NP-20 NP‑030307 withdrawn N1 N1-29 - 2003‑05‑17 IMS-CCR -
0001 - F Rel-5 5.0.0 - 24.229: Alignment with 23.815 regarding transport of charging correlation information - - - N1 N1-23 N1‑020735 rejected 2002‑04‑06 IMS-CCR -
0002 - F Rel-5 5.0.0 - 24.229: Alignment with 23.815 regarding overview of charging information - - - N1 N1-23 N1‑020736 revised 2002‑04‑06 IMS-CCR -
0002 1 F Rel-5 5.0.0 - 24.229: Alignment with 23.815 regarding overview of charging information - - - N1 N1-23 N1‑020920 revised 2002‑04‑16 IMS-CCR -
0002 2 F Rel-5 5.0.0 - 24.229: Alignment with 23.815 regarding overview of charging information - - - N1 N1-23 N1‑020966 postponed 2002‑04‑16 IMS-CCR -
0002 3 F Rel-5 5.0.0 - 24.229: Alignment with 23.815 regarding charging correlation principles - - - N1 goodName N1‑021012 postponed 2002‑04‑29 IMS-CCR -
0002 4 F Rel-5 5.0.0 - 24.229: Alignment with 23.815 regarding overview of charging information - - - N1 N1-24 N1‑021118 rejected 2002‑05‑24 IMS-CCR -
0003 - F Rel-5 5.0.0 - 24.229: Clarifications to multiple filter criteria for supporting different type of AS - - - N1 N1-23 N1‑020737 rejected 2002‑04‑06 IMS-CCR -
0004 - C Rel-5 5.0.0 - S-CSCF Actions on Authentication Failure - - - N1 N1-23 N1‑020741 revised 2002‑04‑06 IMS-CCR -
0004 1 C Rel-5 5.0.0 5.1.0 S-CSCF Actions on Authentication Failure NP-16 NP‑020230 approved N1 N1-23 N1‑020903 agreed 2002‑04‑16 IMS-CCR -
0005 - C Rel-5 5.0.0 - Disallow Parallel Registrations - - - N1 N1-23 N1‑020743 revised 2002‑04‑06 IMS-CCR -
0005 1 C Rel-5 5.0.0 - Disallow Parallel Registrations - - - N1 N1-23 N1‑020906 revised 2002‑04‑16 IMS-CCR -
0005 2 C Rel-5 5.0.0 5.1.0 Disallow Parallel Registrations NP-16 NP‑020230 approved N1 N1-23 N1‑020959 agreed 2002‑04‑16 IMS-CCR -
0006 - F Rel-5 5.0.0 - Temporary IMPI insertion in all SIP messages - - - N1 N1-23 N1‑020746 withdrawn 2002‑04‑06 IMS-CCR -
0007 - F Rel-5 5.0.0 - Hiding - - - N1 N1-23 N1‑020747 revised 2002‑04‑06 IMS-CCR -
0007 1 F Rel-5 5.0.0 5.1.0 Hiding NP-16 NP‑020230 approved N1 N1-23 N1‑020910 agreed 2002‑04‑16 IMS-CCR -
0008 - B Rel-5 5.0.0 - Support for services for unregistered users - - - N1 N1-23 N1‑020764 revised 2002‑04‑06 IMS-CCR -
0008 1 B Rel-5 5.0.0 - Support for services for unregistered users - - - N1 N1-23 N1‑020926 postponed 2002‑04‑16 IMS-CCR -
0008 2 B Rel-5 5.0.0 - Support for services for unregistered users - - - N1 goodName N1‑021020 revised 2002‑04‑29 IMS-CCR -
0008 3 B Rel-5 5.0.0 - Support for services for unregistered users - - - N1 goodName N1‑021064 revised 2002‑04‑29 IMS-CCR -
0008 4 B Rel-5 5.0.0 - Support for services for unregistered users - - - N1 goodName N1‑021085 revised 2002‑04‑29 IMS-CCR -
0008 5 F Rel-5 5.0.0 - Support for services for unregistered users - - - N1 N1-24 N1‑021318 revised 2002‑05‑24 IMS-CCR -
0008 6 F Rel-5 5.0.0 - Support for services for unregistered users - - - N1 N1-24 N1‑021454 revised 2002‑05‑24 IMS-CCR -
0008 7 B Rel-5 5.0.0 - Support for services for unregistered users NP-16 NP‑020230 rejected N1 N1-24 N1‑021506 agreed 2002‑05‑24 IMS-CCR -
0008 8 B Rel-5 5.0.0 5.1.0 Support for services for unregistered users NP-16 NP‑020312 approved Ericsson, - - 2002‑05‑15 IMS-CCR -
0009 - D Rel-5 5.0.0 - Editorials for GPRS Charging ID - - - N1 N1-23 N1‑020778 revised 2002‑04‑06 IMS-CCR -
0009 1 F Rel-5 5.0.0 5.1.0 Editorials for GPRS Charging ID NP-16 NP‑020230 approved N1 N1-23 N1‑020921 agreed 2002‑04‑16 IMS-CCR CR approved by error at NP#16 (never implemented), will make another CR to NP#17 to remove this CR.
0009 2 F Rel-5 5.0.0 - Editorials for GPRS Charging ID - - - N1 N1-24 N1‑021351 - 2002‑05‑24 IMS-CCR -
0010 - F Rel-5 5.0.0 - Passing GCID to AS - - - N1 N1-23 N1‑020779 revised 2002‑04‑06 IMS-CCR -
0010 1 F Rel-5 5.0.0 - Passing GCID to AS NP-16 NP‑020230 withdrawn N1 N1-23 N1‑020922 agreed 2002‑04‑16 IMS-CCR -
0011 - F Rel-5 5.0.0 - Passing registration ICID - - - N1 N1-23 N1‑020780 revised 2002‑04‑06 IMS-CCR -
0011 1 F Rel-5 5.0.0 - Passing registration ICID NP-16 NP‑020230 withdrawn N1 N1-23 N1‑020907 agreed 2002‑04‑16 IMS-CCR -
0012 - F Rel-5 5.0.0 - Passing IOI - - - N1 N1-23 N1‑020781 revised 2002‑04‑06 IMS-CCR -
0012 1 F Rel-5 5.0.0 - Passing IOI - - - N1 N1-23 N1‑020923 revised 2002‑04‑16 IMS-CCR -
0012 2 F Rel-5 5.0.0 - Passing IOI NP-16 NP‑020230 withdrawn N1 N1-23 N1‑020967 agreed 2002‑04‑16 IMS-CCR -
0013 - F Rel-5 5.0.0 - Passing charging function addresses - - - N1 N1-23 N1‑020782 revised 2002‑04‑06 IMS-CCR -
0013 1 F Rel-5 5.0.0 - Passing charging function addresses NP-16 NP‑020230 withdrawn N1 N1-23 N1‑020924 agreed 2002‑04‑16 IMS-CCR -
0013 2 F Rel-5 5.0.0 - 24.229: Clarifications on CCF addresses - - - N1 goodName N1‑021013 postponed 2002‑04‑29 IMS-CCR -
0013 3 F Rel-5 5.0.0 - Passing charging addresses - - - N1 N1-24 N1‑021119 revised 2002‑05‑24 IMS-CCR -
0013 4 F Rel-5 5.0.0 - Passing charging addresses - - - N1 N1-24 N1‑021380 rejected 2002‑05‑24 IMS-CCR -
0014 - F Rel-5 5.0.0 - MRFC INVITE interface details - - - N1 N1-23 N1‑020783 postponed 2002‑04‑06 IMS-CCR -
0014 1 F Rel-5 5.0.0 - MRFC INVITE interface details - - - N1 goodName N1‑020986 postponed 2002‑04‑29 IMS-CCR -
0014 2 F Rel-5 5.0.0 - MRFC INVITE interface details - - - N1 N1-24 N1‑021153 rejected 2002‑05‑24 IMS-CCR -
0015 - F Rel-5 5.0.0 - MRFC OPTIONS interface details - - - N1 N1-23 N1‑020784 postponed 2002‑04‑06 IMS-CCR -
0015 1 F Rel-5 5.0.0 - MRFC OPTIONS interface details - - - N1 goodName N1‑020987 postponed 2002‑04‑29 IMS-CCR -
0015 2 F Rel-5 5.0.0 - MRFC OPTIONS interface details - - - N1 N1-24 N1‑021154 rejected 2002‑05‑24 IMS-CCR -
0016 - F Rel-5 5.0.0 - MRFC selection option at S-CSCF - - - N1 N1-23 N1‑020785 withdrawn 2002‑04‑06 IMS-CCR -
0017 - F Rel-5 5.0.0 - AS to MRFC optimized signaling - - - N1 N1-23 N1‑020786 postponed 2002‑04‑06 IMS-CCR -
0017 1 F Rel-5 5.0.0 - AS to MRFC optimized signaling - - - N1 goodName N1‑020988 postponed 2002‑04‑29 IMS-CCR -
0017 2 F Rel-5 5.0.0 - AS to MRFC optimized signaling - - - N1 N1-24 N1‑021155 rejected 2002‑05‑24 IMS-CCR -
0018 - F Rel-5 5.0.0 - Corrections to original-dialog-id NP-16 NP‑020230 withdrawn N1 N1-23 N1‑020787 agreed 2002‑04‑06 IMS-CCR -
0019 - D Rel-5 5.0.0 5.1.0 MGCF procedure clarification NP-16 NP‑020231 approved N1 N1-23 N1‑020788 agreed 2002‑04‑06 IMS-CCR -
0020 - F Rel-5 5.0.0 - MGCF procedure error cases - - - N1 N1-23 N1‑020789 revised 2002‑04‑06 IMS-CCR -
0020 1 F Rel-5 5.0.0 - MGCF procedure error cases - - - N1 N1-23 N1‑020935 revised 2002‑04‑16 IMS-CCR -
0020 2 F Rel-5 5.0.0 5.1.0 MGCF procedure error cases NP-16 NP‑020231 approved N1 N1-23 N1‑020960 agreed 2002‑04‑16 IMS-CCR -
0021 - F Rel-5 5.0.0 - MGCF OPTIONS interface details - - - N1 N1-23 N1‑020790 postponed 2002‑04‑06 IMS-CCR -
0021 1 F Rel-5 5.0.0 - MGCF OPTIONS interface details - - - N1 goodName N1‑020989 postponed 2002‑04‑29 IMS-CCR -
0021 2 F Rel-5 5.0.0 - MGCF OPTIONS interface details - - - N1 N1-24 N1‑021156 rejected 2002‑05‑24 IMS-CCR -
0022 - D Rel-5 5.0.0 - Abbreviations clean up - - - N1 N1-23 N1‑020791 revised 2002‑04‑06 IMS-CCR -
0022 1 D Rel-5 5.0.0 5.1.0 Abbreviations clean up NP-16 NP‑020231 approved N1 N1-23 N1‑020949 agreed 2002‑04‑16 IMS-CCR -
0023 - D Rel-5 5.0.0 5.1.0 Clarification of SIP usage outside IM CN subsystem NP-16 NP‑020231 approved N1 N1-23 N1‑020792 agreed 2002‑04‑06 IMS-CCR -
0024 - C Rel-5 5.0.0 - Replacement of COMET by UPDATE - - - N1 N1-23 N1‑020793 - 2002‑04‑06 IMS-CCR -
0024 1 C Rel-5 5.0.0 - Replacement of COMET by UPDATE - - - N1 goodName N1‑020997 - 2002‑04‑29 IMS-CCR -
0024 2 C Rel-5 5.0.0 - Replacement of COMET by UPDATE NP-16 NP‑020231 revised N1 N1-24 N1‑021169 agreed 2002‑05‑24 IMS-CCR -
0024 3 C Rel-5 5.0.0 5.1.0 Replacement of COMET by UPDATE NP-16 NP‑020314 approved Lucent Tec - - 2002‑04‑18 IMS-CCR -
0025 - D Rel-5 5.0.0 - Incorporation of current RFC numbers - - - N1 N1-23 N1‑020794 revised 2002‑04‑06 IMS-CCR -
0025 1 D Rel-5 5.0.0 - Incorporation of current RFC numbers - - - N1 N1-23 N1‑020936 - 2002‑04‑16 IMS-CCR -
0025 2 D Rel-5 5.0.0 - Incorporation of current RFC numbers - - - N1 goodName N1‑020998 revised 2002‑04‑29 IMS-CCR -
0025 3 D Rel-5 5.0.0 5.1.0 Incorporation of current RFC numbers NP-16 NP‑020231 approved N1 goodName N1‑021091 agreed 2002‑04‑29 IMS-CCR -
0026 - D Rel-5 5.0.0 - Clarification of B2BUA usage in roles - - - N1 N1-23 N1‑020795 revised 2002‑04‑06 IMS-CCR -
0026 1 D Rel-5 5.0.0 5.1.0 Clarification of B2BUA usage in roles NP-16 NP‑020231 approved N1 N1-23 N1‑020941 agreed 2002‑04‑16 IMS-CCR -
0027 - B Rel-5 5.0.0 - Determination of MOC / MTC in P-CSCF and S-CSCF - - - N1 N1-23 N1‑020796 rejected 2002‑04‑06 IMS-CCR -
0028 - B Rel-5 5.0.0 - Determination of MO / MT requests in I-CSCF(THIG) - - - N1 N1-23 N1‑020797 revised 2002‑04‑06 IMS-CCR -
0028 1 B Rel-5 5.0.0 - Determination of MO / MT requests in I-CSCF(THIG) - - - N1 N1-23 N1‑020909 revised 2002‑04‑16 IMS-CCR -
0028 2 B Rel-5 5.0.0 - Determination of MO / MT requests in I-CSCF(THIG) - - - N1 N1-23 N1‑020965 revised 2002‑04‑16 IMS-CCR -
0028 3 B Rel-5 5.0.0 - Determination of MO / MT requests in I-CSCF(THIG) - - - N1 N1-23 N1‑020970 revised 2002‑04‑16 IMS-CCR -
0028 4 B Rel-5 5.0.0 5.1.0 Determination of MO / MT requests in I-CSCF(THIG) NP-16 NP‑020231 approved N1 N1-24 N1‑021248 agreed 2002‑05‑24 IMS-CCR -
0029 - F Rel-5 5.0.0 - User-initiated deregistration - - - N1 N1-23 N1‑020798 rejected 2002‑04‑06 IMS-CCR -
0030 - F Rel-5 5.0.0 - P-CSCF release of an existing session - - - N1 N1-23 N1‑020799 revised 2002‑04‑06 IMS-CCR -
0030 1 F Rel-5 5.0.0 - P-CSCF release of an existing session - - - N1 N1-23 N1‑020938 revised 2002‑04‑16 IMS-CCR -
0030 2 F Rel-5 5.0.0 5.1.0 P-CSCF release of an existing session NP-16 NP‑020231 approved N1 goodName N1‑021006 agreed 2002‑04‑29 IMS-CCR -
0031 - F Rel-5 5.0.0 - S-CSCF release of an existing session - - - N1 N1-23 N1‑020800 revised 2002‑04‑06 IMS-CCR -
0031 1 F Rel-5 5.0.0 5.1.0 S-CSCF release of an existing session NP-16 NP‑020232 approved N1 N1-23 N1‑020939 agreed 2002‑04‑16 IMS-CCR -
0032 - F Rel-5 5.0.0 - HSS Interaction - - - N1 N1-23 N1‑020801 withdrawn 2002‑04‑06 IMS-CCR -
0033 - C Rel-5 5.0.0 - SDP procedure at the UE - - - N1 N1-23 N1‑020802 revised 2002‑04‑06 IMS-CCR -
0033 1 C Rel-5 5.0.0 - SDP procedure at the UE - - - N1 N1-23 N1‑020932 revised 2002‑04‑16 IMS-CCR -
0033 2 C Rel-5 5.0.0 - SDP procedure at the UE - - - N1 N1-23 N1‑020968 revised 2002‑04‑16 IMS-CCR -
0033 3 C Rel-5 5.0.0 5.1.0 SDP procedure at the UE NP-16 NP‑020232 approved N1 N1-23 N1‑020971 agreed 2002‑04‑16 IMS-CCR -
0034 - F Rel-5 5.0.0 - SDP-related procedures at the P-CSCF - - - N1 N1-23 N1‑020803 rejected 2002‑04‑06 IMS-CCR -
0035 - F Rel-5 5.0.0 - AS Procedures corrections - - - N1 N1-23 N1‑020806 revised 2002‑04‑06 IMS-CCR -
0035 1 F Rel-5 5.0.0 5.1.0 AS Procedures corrections NP-16 NP‑020232 approved N1 N1-23 N1‑020934 agreed 2002‑04‑16 IMS-CCR -
0035 2 F Rel-5 5.4.0 - User initiated de-registration at P-CSCF NP-20 NP‑030291 rejected Nokia - N1‑030558 - 2003‑03‑24 IMS-CCR - 2003‑06‑06
0035 2 F Rel-5 5.4.0 - User initiated de-registration at P-CSCF NP-20 SP‑030259 revised Nokia - N1‑030558 - 2003‑03‑24 IMS-CCR - 2003‑06‑06
0036 - C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 N1-23 N1‑020808 revised 2002‑04‑06 IMS-CCR -
0036 1 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 N1-23 N1‑020945 revised 2002‑04‑16 IMS-CCR -
0036 2 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 goodName N1‑021043 revised 2002‑04‑29 IMS-CCR -
0036 3 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 goodName N1‑021088 revised 2002‑04‑29 IMS-CCR -
0036 4 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 goodName N1‑021099 revised 2002‑04‑29 IMS-CCR -
0036 5 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 N1-24 N1‑021334 rejected 2002‑05‑24 IMS-CCR -
0036 6 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 N1-24 N1‑021399 revised 2002‑05‑24 IMS-CCR -
0036 7 C Rel-5 5.0.0 - Corrections to SIP Compression - - - N1 N1-24 N1‑021459 revised 2002‑05‑24 IMS-CCR -
0036 8 C Rel-5 5.0.0 5.1.0 Corrections to SIP Compression NP-16 NP‑020232 approved N1 N1-24 N1‑021499 agreed 2002‑05‑24 IMS-CCR -
0037 - F Rel-5 5.0.0 - Enhancement of S-CSCF and I-CSCF Routing Procedures for interworking with external networks - - - N1 N1-23 N1‑020814 revised 2002‑04‑06 IMS-CCR -
0037 1 F Rel-5 5.0.0 5.1.0 Enhancement of S-CSCF and I-CSCF Routing Procedures for interworking with external networks NP-16 NP‑020232 approved N1 N1-23 N1‑020928 agreed 2002‑04‑16 IMS-CCR -
0038 - F Rel-5 5.0.0 - Use of P-Headers for 3GPP specific Headers - - - N1 N1-23 N1‑020815 rejected 2002‑04‑16 IMS-CCR -
0039 - - Rel-5 5.0.0 - SIP timer default values - - - N1 N1-23 N1‑020819 withdrawn 2002‑04‑06 IMS-CCR -
0040 - - Rel-5 5.0.0 - Introduction of IMS signalling flag - - - N1 N1-23 N1‑020820 revised 2002‑04‑06 IMS-CCR -
0040 1 - Rel-5 5.0.0 - Introduction of IMS signalling flag - - - N1 N1-23 N1‑020946 postponed 2002‑04‑16 IMS-CCR -
0040 2 B Rel-5 5.0.0 - Introduction of IMS signalling flag, IPv6 prefix and binding information - - - N1 goodName N1‑021030 revised 2002‑04‑29 IMS-CCR -
0040 3 B Rel-5 5.0.0 - Introduction of IMS signalling flag, IPv6 prefix and binding information - - - N1 goodName N1‑021065 revised 2002‑04‑29 IMS-CCR -
0040 4 B Rel-5 5.0.0 - Introduction of IMS signalling flag - - - N1 goodName N1‑021094 postponed 2002‑04‑29 IMS-CCR -
0040 5 B Rel-5 5.0.0 - Introduction of IMS signalling flag - - - N1 N1-24 N1‑021218 revised 2002‑05‑24 IMS-CCR -
0040 6 B Rel-5 5.0.0 - Introduction of IMS signalling flag - - - N1 N1-24 N1‑021437 rejected 2002‑05‑24 IMS-CCR -
0041 - F Rel-5 5.0.0 - Delivery of IMS security parameters from S-CSCF to the P-CSCF by using proprietary auth-param - - - N1 N1-23 N1‑020825 revised 2002‑04‑06 IMS-CCR -
0041 1 F Rel-5 5.0.0 - Delivery of IMS security parameters from S-CSCF to the P-CSCF by using proprietary auth-param - - - N1 N1-23 N1‑020915 revised 2002‑04‑16 IMS-CCR -
0041 2 F Rel-5 5.0.0 5.1.0 Delivery of IMS security parameters from S-CSCF to the P-CSCF by using proprietary auth-param NP-16 NP‑020232 approved N1 goodName N1‑021003 agreed 2002‑04‑29 IMS-CCR -
0042 - F Rel-5 5.0.0 - Delivery of IMS security parameters from S-CSCF to the P-CSCF by using proprietary header - - - N1 N1-23 N1‑020827 withdrawn 2002‑04‑06 IMS-CCR -
0043 - F Rel-5 5.0.0 - Delivery of IMS security parameters from S-CSCF to the P-CSCF by using XML body - - - N1 N1-23 N1‑020829 withdrawn 2002‑04‑06 IMS-CCR -
0044 - F Rel-5 5.0.0 - SIP Compression - - - N1 N1-23 N1‑020832 - 2002‑04‑06 IMS-CCR -
0045 - D Rel-5 5.0.0 5.1.0 Cleanup of request / response terminology - clause 5 NP-16 NP‑020232 approved N1 N1-23 N1‑020835 agreed 2002‑04‑06 IMS-CCR -
0046 - D Rel-5 5.0.0 5.1.0 Cleanup of request / response terminology - clause 6 NP-16 NP‑020232 approved N1 N1-23 N1‑020836 agreed 2002‑04‑06 IMS-CCR -
0047 - D Rel-5 5.0.0 - Simplification of profile tables - - - N1 N1-23 N1‑020837 revised 2002‑04‑06 IMS-CCR -
0047 1 D Rel-5 5.0.0 - Simplification of profile tables - - - N1 goodName N1‑021057 revised 2002‑04‑29 IMS-CCR -
0047 2 D Rel-5 5.0.0 5.1.0 Simplification of profile tables NP-16 NP‑020232 approved N1 goodName N1‑021059 agreed 2002‑04‑29 IMS-CCR -
0048 - C Rel-5 5.0.0 - Revision of signalling compression text to introduce new IETF drafts - - - N1 N1-23 N1‑020838 rejected 2002‑04‑06 IMS-CCR -
0049 - C Rel-5 5.0.0 5.1.0 Forking options NP-16 NP‑020232 approved N1 N1-23 N1‑020839 agreed 2002‑04‑06 IMS-CCR -
0050 - C Rel-5 5.0.0 - Media-Authorization header corrections NP-16 NP‑020233 revised N1 N1-23 N1‑020840 agreed 2002‑04‑06 IMS-CCR -
0050 1 C Rel-5 5.0.0 5.1.0 Media-Authorization header corrections NP-16 NP‑020315 approved Lucent Tec - - 2002‑04‑02 IMS-CCR -
0051 - C Rel-5 5.0.0 - Clause 5.4 editorials (S-CSCF) - - - N1 N1-23 N1‑020841 revised 2002‑04‑06 IMS-CCR -
0051 1 F Rel-5 5.0.0 5.1.0 Clause 5.4 editorials (S-CSCF) NP-16 NP‑020233 approved N1 N1-23 N1‑020950 agreed 2002‑04‑16 IMS-CCR -
0052 - F Rel-5 5.0.0 - Authentication error cases - - - N1 N1-23 N1‑020843 rejected 2002‑04‑06 IMS-CCR -
0053 - F Rel-5 5.0.0 - Integrity protection signal from P-CSCF to S-CSCF - - - N1 N1-23 N1‑020844 revised 2002‑04‑06 IMS-CCR -
0053 1 F Rel-5 5.0.0 - Integrity protection signal from P-CSCF to S-CSCF - - - N1 N1-23 N1‑020901 revised 2002‑04‑16 IMS-CCR -
0053 2 F Rel-5 5.0.0 5.1.0 Integrity protection signalling from the P-CSCF to the S-CSCF NP-16 NP‑020233 approved N1 goodName N1‑021007 agreed 2002‑04‑29 IMS-CCR -
0054 - B Rel-5 5.0.0 5.1.0 Representing IM CN subsystem functional entities in profile table roles NP-16 NP‑020233 approved N1 N1-23 N1‑020847 agreed 2002‑04‑06 IMS-CCR -
0055 - D Rel-5 5.0.0 5.1.0 Clause 4 editorials NP-16 NP‑020233 approved N1 N1-23 N1‑020848 agreed 2002‑04‑06 IMS-CCR -
0056 - D Rel-5 5.0.0 5.1.0 Clause 5.8 editorials (MRFC) NP-16 NP‑020233 approved N1 N1-23 N1‑020849 agreed 2002‑04‑06 IMS-CCR -
0057 - D Rel-5 5.0.0 - Annex A editorials, including precondition additions - - - N1 N1-23 N1‑020850 - 2002‑04‑06 IMS-CCR -
0057 1 D Rel-5 5.0.0 5.1.0 Annex A editorials, including precondition additions NP-16 NP‑020233 approved N1 goodName N1‑021001 agreed 2002‑04‑29 IMS-CCR -
0058 - F Rel-5 5.0.0 - Representing the registrar as a UA - - - N1 N1-23 N1‑020851 - 2002‑04‑06 IMS-CCR -
0058 1 F Rel-5 5.0.0 - Representing the registrar as a UA - - - N1 goodName N1‑021002 revised 2002‑04‑29 IMS-CCR -
0058 2 F Rel-5 5.0.0 5.1.0 Representing the registrar as a UA NP-16 NP‑020233 approved N1 goodName N1‑021054 agreed 2002‑04‑29 IMS-CCR -
0059 - D Rel-5 5.0.0 5.1.0 Additional definitions NP-16 NP‑020233 approved N1 N1-23 N1‑020852 agreed 2002‑04‑06 IMS-CCR -
0060 - F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-23 N1‑020905 revised 2002‑04‑16 IMS-CCR -
0060 1 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-23 N1‑020957 revised 2002‑04‑16 IMS-CCR -
0060 1 F Rel-5 5.0.0 5.1.0 Restructuring of S-CSCF Registration Sections NP-16 NP‑020312 approved Orange Fra - - 2002‑05‑17 IMS-CCR -
0060 10 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections NP-16 NP‑020234 revised N1 N1-24 N1‑021511 agreed 2002‑05‑24 IMS-CCR -
0060 11 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections NP-16 NP‑020312 approved N1 N1-24 N1‑021511 agreed 2002‑05‑24 IMS-CCR -
0060 2 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-23 N1‑020969 revised 2002‑04‑16 IMS-CCR -
0060 3 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 goodName N1‑021063 revised 2002‑04‑29 IMS-CCR -
0060 4 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-24 N1‑021109 revised 2002‑05‑24 IMS-CCR -
0060 5 B Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-24 N1‑021200 revised 2002‑05‑24 IMS-CCR -
0060 6 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-24 N1‑021247 revised 2002‑05‑24 IMS-CCR -
0060 7 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-24 N1‑021319 revised 2002‑05‑24 IMS-CCR -
0060 8 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-24 N1‑021432 revised 2002‑05‑24 IMS-CCR -
0060 9 F Rel-5 5.0.0 - Restructuring of S-CSCF Registration Sections - - - N1 N1-24 N1‑021507 revised 2002‑05‑24 IMS-CCR -
0061 - F Rel-5 5.0.0 - Determination of MOC / MTC at P-CSCF and S-CSCF - - - N1 N1-23 N1‑020908 revised 2002‑04‑16 IMS-CCR -
0061 1 F Rel-5 5.0.0 - Determination of MOC / MTC at P-CSCF and S-CSCF - - - N1 N1-23 N1‑020958 revised 2002‑04‑16 IMS-CCR -
0061 2 F Rel-5 5.0.0 5.1.0 Determination of MOC / MTC at P-CSCF and S-CSCF NP-16 NP‑020234 approved N1 goodName N1‑021060 agreed 2002‑04‑29 IMS-CCR -
0062 - F Rel-5 5.0.0 5.1.0 Correction to the terminating procedures NP-16 NP‑020234 approved N1 N1-23 N1‑020927 agreed 2002‑04‑16 IMS-CCR -
0063 - F Rel-5 5.0.0 5.1.0 Loose Routing for Network Initiated Call Release Procedures NP-16 NP‑020234 approved N1 N1-23 N1‑020940 agreed 2002‑04‑16 IMS-CCR -
0064 - F Rel-5 5.0.0 5.1.0 Incorporation of previously agreed corrections to clause 5.2.5.2 (N1-020416) NP-16 NP‑020234 approved N1 goodName N1‑021004 agreed 2002‑04‑29 IMS-CCR -
0065 - D Rel-5 5.0.0 5.1.0 Clause 7.2 editorial corrections NP-16 NP‑020234 approved N1 goodName N1‑021005 agreed 2002‑04‑29 IMS-CCR -
0066 - B Rel-5 5.0.0 - S-CSCF interaction with HSS - - - N1 goodName N1‑021009 rejected 2002‑04‑29 IMS-CCR -
0067 - F Rel-5 5.0.0 - S-CSCF routing of MO calls - - - N1 goodName N1‑021010 revised 2002‑04‑29 IMS-CCR -
0067 1 F Rel-5 5.0.0 - S-CSCF routing of MO calls - - - N1 goodName N1‑021077 revised 2002‑04‑29 IMS-CCR -
0067 2 B Rel-5 5.0.0 5.1.0 S-CSCF routing of MO calls NP-16 NP‑020234 approved N1 goodName N1‑021097 agreed 2002‑04‑29 IMS-CCR -
0068 - F Rel-5 5.0.0 - I-CSCF routeing of dialog requests - - - N1 goodName N1‑021011 revised 2002‑04‑29 IMS-CCR -
0068 1 F Rel-5 5.0.0 5.1.0 I-CSCF routeing of dialog requests NP-16 NP‑020234 approved N1 goodName N1‑021078 agreed 2002‑04‑29 IMS-CCR -
0069 - F Rel-5 5.0.0 - Definition of the Tokanised-by parameter - - - N1 goodName N1‑021024 revised 2002‑04‑29 IMS-CCR -
0069 1 F Rel-5 5.0.0 - Definition of the Tokanised-by parameter - - - N1 goodName N1‑021066 revised 2002‑04‑29 IMS-CCR -
0069 2 F Rel-5 5.0.0 5.1.0 Definition of the Tokanised-by parameter NP-16 NP‑020234 approved N1 goodName N1‑021096 agreed 2002‑04‑29 IMS-CCR -
0070 - F Rel-5 5.0.0 - SDP procedures at UE - - - N1 goodName N1‑021025 revised 2002‑04‑29 IMS-CCR -
0070 1 F Rel-5 5.0.0 - SDP procedures at UE - - - N1 goodName N1‑021080 - 2002‑04‑29 IMS-CCR -
0070 2 F Rel-5 5.0.0 - SDP procedures at UE - - - N1 N1-24 N1‑021259 revised 2002‑05‑24 IMS-CCR -
0070 3 F Rel-5 5.0.0 5.1.0 SDP procedures at UE NP-16 NP‑020235 approved N1 N1-24 N1‑021453 agreed 2002‑05‑24 IMS-CCR -
0071 - F Rel-5 5.0.0 - RPID parameter insertion into the SIP messages - - - N1 goodName N1‑021026 withdrawn 2002‑04‑29 IMS-CCR -
0072 - B Rel-5 5.0.0 - Grouping of m-lines in SDP - - - N1 goodName N1‑021029 postponed 2002‑04‑29 IMS-CCR -
0073 - F Rel-5 5.0.0 - Updates to the procedures involving the iFCs, following the Oulu iFC changes - - - N1 goodName N1‑021022 revised 2002‑04‑29 IMS-CCR -
0073 1 F Rel-5 5.0.0 - Updates to the procedures involving the iFCs, following the Oulu iFC changes - - - N1 N1-24 N1‑021320 rejected 2002‑05‑24 IMS-CCR -
0073 2 F Rel-5 5.0.0 5.1.0 Updates to the procedures involving the iFCs, following the Oulu iFC changes NP-16 NP‑020235 approved N1 N1-24 N1‑021440 agreed 2002‑05‑24 IMS-CCR -
0074 - F Rel-5 5.0.0 - Addition of DHCPv6 references to 24.229 - - - N1 goodName N1‑021036 revised 2002‑04‑29 IMS-CCR -
0074 1 F Rel-5 5.0.0 5.1.0 Addition of DHCPv6 references to 24.229 NP-16 NP‑020235 approved N1 goodName N1‑021086 agreed 2002‑04‑29 IMS-CCR -
0075 - F Rel-5 5.0.0 - Clarification to URL and address assignments - - - N1 goodName N1‑020984 revised 2002‑04‑29 IMS-CCR -
0075 1 F Rel-5 5.0.0 5.1.0 Clarification to URL and address assignments NP-16 NP‑020235 approved N1 goodName N1‑021083 agreed 2002‑04‑29 IMS-CCR -
0076 - F Rel-5 5.0.0 - Restructuring P-CSCF Registration Sections - - - N1 goodName N1‑021047 - 2002‑04‑29 IMS-CCR -
0077 - F Rel-5 5.0.0 - Restructuring UE Registration Sections - - - N1 goodName N1‑021048 - 2002‑04‑29 IMS-CCR -
0078 - F Rel-5 5.0.0 - Restructuring S-CSCF Registration abnormal cases - - - N1 goodName N1‑021049 - 2002‑04‑29 IMS-CCR -
0079 - F Rel-5 5.0.0 - Downloading the implicitely registered public user identities from the S-CSCF to P-CSCF - - - N1 goodName N1‑021074 postponed 2002‑04‑29 IMS-CCR -
0079 1 F Rel-5 5.0.0 - Downloading the implicitely registered public user identities from the S-CSCF to P-CSCF - - - N1 N1-24 N1‑021262 revised 2002‑05‑24 IMS-CCR -
0079 2 F Rel-5 5.0.0 - Downloading the implicitely registered public user identities from the S-CSCF to P-CSCF - - - N1 N1-24 N1‑021474 revised 2002‑05‑24 IMS-CCR -
0079 3 F Rel-5 5.0.0 5.1.0 Downloading the implicitely registered public user identities from the S-CSCF to P-CSCF NP-16 NP‑020235 approved N1 N1-24 N1‑021510 agreed 2002‑05‑24 IMS-CCR -
0080 - B Rel-5 5.0.0 - Introduction of IPv6 prefix and binding information - - - N1 goodName N1‑021095 revised 2002‑04‑29 IMS-CCR -
0080 1 B Rel-5 5.0.0 - Introduction of IPv6 prefix and binding information - - - N1 N1-24 N1‑021204 revised 2002‑05‑24 IMS-CCR -
0080 2 B Rel-5 5.0.0 - Introduction of IPv6 prefix and binding information - - - N1 N1-24 N1‑021447 revised 2002‑05‑24 IMS-CCR -
0080 3 F Rel-5 5.0.0 5.1.0 Clarification of GPRS aspects NP-16 NP‑020235 approved N1 N1-24 N1‑021486 agreed 2002‑05‑24 IMS-CCR -
0080 4 B Rel-5 5.0.0 - Introduction of IPv6 prefix and binding information NP-16 NP‑020276 revised - - - 2002‑05‑24 IMS-CCR Taken directly to plenary
0081 - F Rel-5 5.0.0 - Introduction of Subscription Locator Function Interrogation at I-CSCF in 24.229 - - - N1 N1-24 N1‑021108 revised 2002‑05‑24 IMS-CCR -
0081 1 F Rel-5 5.0.0 - Introduction of Subscription Locator Function Interrogation at I-CSCF in 24.229 - - - N1 N1-24 N1‑021439 revised 2002‑05‑24 IMS-CCR -
0081 2 F Rel-5 5.0.0 5.1.0 Introduction of Subscription Locator Function Interrogation at I-CSCF in 24.229 NP-16 NP‑020235 approved N1 N1-24 N1‑021469 agreed 2002‑05‑24 IMS-CCR -
0082 - C Rel-5 5.0.0 - Introduction of Visited_Network_ID p-header - - - N1 N1-24 N1‑021111 revised 2002‑05‑24 IMS-CCR -
0082 1 C Rel-5 5.0.0 5.1.0 Introduction of Visited_Network_ID p-header NP-16 NP‑020235 approved N1 N1-24 N1‑021433 agreed 2002‑05‑24 IMS-CCR -
0083 - F Rel-5 5.0.0 - 24.229: Clarifications on IMS Forking - - - N1 N1-24 N1‑021120 rejected 2002‑05‑24 IMS-CCR -
0084 - F Rel-5 5.0.0 - MRFC register addresses - - - N1 N1-24 N1‑021150 revised 2002‑05‑24 IMS-CCR -
0084 1 F Rel-5 5.0.0 5.1.0 MRFC register addresses NP-16 NP‑020236 approved N1 N1-24 N1‑021434 agreed 2002‑05‑24 IMS-CCR -
0085 - F Rel-5 5.0.0 - MRFC INVITE interface editor's notes - - - N1 N1-24 N1‑021157 revised 2002‑05‑24 IMS-CCR -
0085 1 F Rel-5 5.0.0 5.1.0 MRFC INVITE interface editor's notes NP-16 NP‑020236 approved N1 N1-24 N1‑021470 agreed 2002‑05‑24 IMS-CCR -
0086 - F Rel-5 5.0.0 - MRFC OPTIONS interface editor's notes - - - N1 N1-24 N1‑021158 revised 2002‑05‑24 IMS-CCR -
0086 1 F Rel-5 5.0.0 5.1.0 MRFC OPTIONS interface editor's notes NP-16 NP‑020236 approved N1 N1-24 N1‑021471 agreed 2002‑05‑24 IMS-CCR -
0087 - F Rel-5 5.0.0 5.1.0 MRFC PRACK & INFO editor's notes NP-16 NP‑020236 approved N1 N1-24 N1‑021159 agreed 2002‑05‑24 IMS-CCR -
0088 - F Rel-5 5.0.0 - MGCF OPTIONS interface editor's notes - - - N1 N1-24 N1‑021160 revised 2002‑05‑24 IMS-CCR -
0088 1 F Rel-5 5.0.0 5.1.0 MGCF OPTIONS interface editor's notes NP-16 NP‑020236 approved N1 N1-24 N1‑021472 agreed 2002‑05‑24 IMS-CCR -
0089 - F Rel-5 5.0.0 5.1.0 MGCF reINVITE editor's notes NP-16 NP‑020236 approved N1 N1-24 N1‑021161 agreed 2002‑05‑24 IMS-CCR -
0090 - F Rel-5 5.0.0 5.1.0 3PCC AS editor's notes NP-16 NP‑020237 approved N1 N1-24 N1‑021162 agreed 2002‑05‑24 IMS-CCR -
0091 - F Rel-5 5.0.0 5.1.0 AS acting as terminating UA editor's notes NP-16 NP‑020237 approved N1 N1-24 N1‑021163 agreed 2002‑05‑24 IMS-CCR -
0092 - F Rel-5 5.0.0 - AS acting as originating UA editor's notes - - - N1 N1-24 N1‑021164 revised 2002‑05‑24 IMS-CCR -
0092 1 F Rel-5 5.0.0 5.1.0 AS acting as originating UA editor's notes NP-16 NP‑020237 approved N1 N1-24 N1‑021466 agreed 2002‑05‑24 IMS-CCR -
0093 - F Rel-5 5.0.0 - Charging overview clause - - - N1 N1-24 N1‑021165 revised 2002‑05‑24 IMS-CCR -
0093 1 F Rel-5 5.0.0 - Charging overview clause - - - N1 N1-24 N1‑021450 revised 2002‑05‑24 IMS-CCR -
0093 2 F Rel-5 5.0.0 5.1.0 Charging overview clause NP-16 NP‑020237 approved N1 N1-24 N1‑021512 agreed 2002‑05‑24 IMS-CCR -
0094 - F Rel-5 5.0.0 - Procedures for original-dialog-id P-header - - - N1 N1-24 N1‑021166 revised 2002‑05‑24 IMS-CCR -
0094 1 F Rel-5 5.0.0 5.1.0 Procedures for original-dialog-id P-header NP-16 NP‑020237 approved N1 N1-24 N1‑021456 agreed 2002‑05‑24 IMS-CCR -
0095 - F Rel-5 5.0.0 - Procedures for charging-vector P-header - - - N1 N1-24 N1‑021167 revised 2002‑05‑24 IMS-CCR -
0095 1 F Rel-5 5.0.0 - Procedures for charging-vector P-header - - - N1 N1-24 N1‑021457 revised 2002‑05‑24 IMS-CCR -
0095 2 F Rel-5 5.0.0 5.1.0 Procedures for charging-vector P-header NP-16 NP‑020237 approved N1 N1-24 N1‑021513 agreed 2002‑05‑24 IMS-CCR -
0096 - F Rel-5 5.0.0 - Procedures for charging-function-addresses P-header - - - N1 N1-24 N1‑021168 revised 2002‑05‑24 IMS-CCR -
0096 1 F Rel-5 5.0.0 5.1.0 Procedures for charging-function-addresses P-header NP-16 NP‑020237 approved N1 N1-24 N1‑021458 agreed 2002‑05‑24 IMS-CCR -
0097 - F Rel-5 5.0.0 - SDP types - - - N1 N1-24 N1‑021170 revised 2002‑05‑24 IMS-CCR -
0097 1 F Rel-5 5.0.0 5.1.0 SDP types NP-16 NP‑020237 approved N1 N1-24 N1‑021467 agreed 2002‑05‑24 IMS-CCR -
0098 - F Rel-5 5.0.0 - Usage of SDP by the UE - - - N1 N1-24 N1‑021171 rejected 2002‑05‑24 IMS-CCR -
0099 - F Rel-5 5.0.0 - Generalised offer/answer procedure - - - N1 N1-24 N1‑021172 rejected 2002‑05‑24 IMS-CCR -
0100 - F Rel-5 5.0.0 5.1.0 Removal of State from profile tables NP-16 NP‑020237 approved N1 N1-24 N1‑021173 agreed 2002‑05‑24 IMS-CCR -
0101 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 3 NP-16 NP‑020238 approved N1 N1-24 N1‑021174 agreed 2002‑05‑24 IMS-CCR -
0102 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 4 NP-16 NP‑020238 approved N1 N1-24 N1‑021175 agreed 2002‑05‑24 IMS-CCR -
0103 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 5.1 and deletion of void subclauses NP-16 NP‑020238 approved N1 N1-24 N1‑021176 agreed 2002‑05‑24 IMS-CCR -
0104 - F Rel-5 5.0.0 - Editor's note cleanup - clause 5.2 and deletion of void subclauses - - - N1 N1-24 N1‑021177 revised 2002‑05‑24 IMS-CCR -
0104 1 F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 5.2 and deletion of void subclauses NP-16 NP‑020238 approved N1 N1-24 N1‑021487 agreed 2002‑05‑24 IMS-CCR -
0105 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 5.3 NP-16 NP‑020238 approved N1 N1-24 N1‑021178 agreed 2002‑05‑24 IMS-CCR -
0106 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 5.4 and deletion of void subclauses NP-16 NP‑020238 approved N1 N1-24 N1‑021179 agreed 2002‑05‑24 IMS-CCR -
0107 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 5.5 and deletion of void subclauses NP-16 NP‑020238 approved N1 N1-24 N1‑021180 agreed 2002‑05‑24 IMS-CCR -
0108 - F Rel-5 5.0.0 - Editor's note cleanup - clause 5.7 - - - N1 N1-24 N1‑021181 withdrawn 2002‑05‑24 IMS-CCR -
0109 - F Rel-5 5.0.0 - Editor's note cleanup - clause 5.8 and deletion of void subclauses - - - N1 N1-24 N1‑021182 withdrawn 2002‑05‑24 IMS-CCR -
0110 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 6 NP-16 NP‑020238 approved N1 N1-24 N1‑021183 agreed 2002‑05‑24 IMS-CCR -
0111 - F Rel-5 5.0.0 5.1.0 Editor's note cleanup - clause 9 NP-16 NP‑020238 approved N1 N1-24 N1‑021184 agreed 2002‑05‑24 IMS-CCR -
0112 - F Rel-5 5.0.0 - Identification of supported IETF drafts within this release - - - N1 N1-24 N1‑021185 rejected 2002‑05‑24 IMS-CCR -
0113 - C Rel-5 5.0.0 - SIP Default Timers - - - N1 N1-24 N1‑021190 revised 2002‑05‑24 IMS-CCR -
0113 1 C Rel-5 5.0.0 5.1.0 SIP Default Timers NP-16 NP‑020239 approved N1 N1-24 N1‑021465 agreed 2002‑05‑24 IMS-CCR -
0114 - F Rel-5 5.0.0 - Correction of the subscription to the registration event package - - - N1 N1-24 N1‑021197 revised 2002‑05‑24 IMS-CCR -
0114 1 F Rel-5 5.0.0 5.1.0 Correction of the subscription to the registration event package NP-16 NP‑020239 approved N1 N1-24 N1‑021436 agreed 2002‑05‑24 IMS-CCR -
0115 - B Rel-5 5.0.0 - Support for ISIMless UICC - - - N1 N1-24 N1‑021199 revised 2002‑05‑24 IMS-CCR -
0115 1 B Rel-5 5.0.0 5.1.0 Support for ISIMless UICC NP-16 NP‑020239 approved N1 N1-24 N1‑021441 agreed 2002‑05‑24 IMS-CCR -
0116 - B Rel-5 5.0.0 - S-CSCF selection procedures - - - N1 N1-24 N1‑021211 rejected 2002‑05‑24 IMS-CCR -
0117 - C Rel-5 5.0.0 - Backwards compatibility improvements to IMS Signalling Flag - - - N1 N1-24 N1‑021214 rejected 2002‑05‑24 IMS-CCR -
0118 - C Rel-5 5.0.0 - Use Of Integrity Flag - - - N1 N1-24 N1‑021216 withdrawn 2002‑05‑24 IMS-CCR -
0119 - F Rel-5 5.0.0 - SIP procedures at UE - - - N1 N1-24 N1‑021231 revised 2002‑05‑24 IMS-CCR -
0119 1 F Rel-5 5.0.0 5.1.0 SIP procedures at UE NP-16 NP‑020239 approved N1 N1-24 N1‑021452 agreed 2002‑05‑24 IMS-CCR -
0120 - F Rel-5 5.0.0 - Alignment with IETF Path header and P-Service-Route - - - N1 N1-24 N1‑021246 revised 2002‑05‑24 IMS-CCR -
0120 1 F Rel-5 5.0.0 - Alignment with IETF Path header and P-Service-Route - - - N1 N1-24 N1‑021383 rejected 2002‑05‑24 IMS-CCR -
0121 - F Rel-5 5.0.0 - New requirements in the P-CSCF - - - N1 N1-24 N1‑021260 revised 2002‑05‑24 IMS-CCR -
0121 1 F Rel-5 5.0.0 - New requirements in the P-CSCF - - - N1 N1-24 N1‑021463 revised 2002‑05‑24 IMS-CCR -
0121 2 F Rel-5 5.0.0 5.1.0 New requirements in the P-CSCF NP-16 NP‑020239 approved N1 N1-24 N1‑021509 agreed 2002‑05‑24 IMS-CCR -
0122 - F Rel-5 5.0.0 5.1.0 SDP procedures at MGCF NP-16 NP‑020239 approved N1 N1-24 N1‑021264 agreed 2002‑05‑24 IMS-CCR -
0123 - F Rel-5 5.0.0 - AS determination of MO/MT - - - N1 N1-24 N1‑021265 rejected 2002‑05‑24 IMS-CCR -
0124 - F Rel-5 5.0.0 - S-CSCF allocation - - - N1 N1-24 N1‑021295 revised 2002‑05‑24 IMS-CCR -
0124 1 F Rel-5 5.0.0 5.1.0 S-CSCF allocation NP-16 NP‑020239 approved N1 N1-24 N1‑021443 agreed 2002‑05‑24 IMS-CCR -
0125 - F Rel-5 5.0.0 - Corrections UE procedures during IMS call initiation to allow charging - - - N1 N1-24 N1‑021297 withdrawn 2002‑05‑24 IMS-CCR -
0126 - C Rel-5 5.0.0 - Support for IMS access without ISIM application - - - N1 N1-24 N1‑021322 rejected 2002‑05‑24 IMS-CCR -
0127 - C Rel-5 5.0.0 - Emergency Service procedure corretion - - - N1 N1-24 N1‑021323 revised 2002‑05‑24 IMS-CCR -
0127 1 C Rel-5 5.0.0 - Emergency Service procedure corretion - - - N1 N1-24 N1‑021444 rejected 2002‑05‑24 IMS-CCR -
0128 - C Rel-5 5.0.0 - Number of media components per PDP Context - - - N1 N1-24 N1‑021325 revised 2002‑05‑24 IMS-CCR -
0128 1 C Rel-5 5.0.0 - Number of media components per PDP Context - - - N1 N1-24 N1‑021476 withdrawn 2002‑05‑24 IMS-CCR -
0129 - F Rel-5 5.0.0 - Introduction of P-Access-Network-Info header - - - N1 N1-24 N1‑021332 revised 2002‑05‑24 IMS-CCR -
0129 1 C Rel-5 5.0.0 5.1.0 Introduction of P-Access-Network-Info header NP-16 NP‑020240 approved N1 N1-24 N1‑021498 agreed 2002‑05‑24 IMS-CCR -
0130 - F Rel-5 5.0.0 - Usage of Path and P-Service Route - - - N1 N1-24 N1‑021336 revised 2002‑05‑24 IMS-CCR -
0130 1 F Rel-5 5.0.0 - Usage of Path and P-Service Route - - - N1 N1-24 N1‑021460 revised 2002‑05‑24 IMS-CCR -
0130 2 F Rel-5 5.0.0 5.1.0 Usage of Path and P-Service Route NP-16 NP‑020240 approved N1 N1-24 N1‑021508 agreed 2002‑05‑24 IMS-CCR -
0131 - F Rel-5 5.0.0 - Allowing the transport of the GPRS Charging Info in 200 OK - - - N1 N1-24 N1‑021342 rejected 2002‑05‑24 IMS-CCR -
0132 - F Rel-5 5.0.0 - SA setup related procedures at the P-CSCF - - - N1 N1-24 N1‑021343 revised 2002‑05‑24 IMS-CCR -
0132 1 F Rel-5 5.0.0 - SA setup related procedures at the P-CSCF - - - N1 N1-24 N1‑021402 postponed 2002‑05‑24 IMS-CCR -
0133 - F Rel-5 5.0.0 5.1.0 Removal of Referred-By header from specification NP-16 NP‑020240 approved N1 N1-24 N1‑021354 agreed 2002‑05‑24 IMS-CCR -
0134 - F Rel-5 5.0.0 5.1.0 Handling of Record-Route header in profile tables NP-16 NP‑020240 approved N1 N1-24 N1‑021357 agreed 2002‑05‑24 IMS-CCR -
0135 - F Rel-5 5.0.0 - Asserted identities and privacy - - - N1 N1-24 N1‑021358 postponed 2002‑05‑24 IMS-CCR -
0135 1 B Rel-5 5.0.0 5.1.0 Asserted identities and privacy NP-16 NP‑020312 approved Lucent Tec - - 2002‑05‑11 IMS-CCR -
0136 - F Rel-5 5.0.0 5.1.0 Removal of caller preferences from specification NP-16 NP‑020240 approved N1 N1-24 N1‑021359 agreed 2002‑05‑24 IMS-CCR -
0137 - F Rel-5 5.0.0 5.1.0 Substitution of REFER references NP-16 NP‑020240 approved N1 N1-24 N1‑021360 agreed 2002‑05‑24 IMS-CCR -
0138 - F Rel-5 5.0.0 5.1.0 Removal of session timer from specification NP-16 NP‑020240 approved N1 N1-24 N1‑021361 agreed 2002‑05‑24 IMS-CCR -
0139 - F Rel-5 5.0.0 - Compression error cases - - - N1 N1-24 N1‑021429 withdrawn 2002‑05‑24 IMS-CCR -
0140 - F Rel-5 5.1.0 - Support of non-IMS forking. - - - N1 N1-25 N1‑021557 revised 2002‑07‑24 IMS-CCR -
0140 1 F Rel-5 5.1.0 - Support of non-IMS forking. NP-17 NP‑020375 rejected N1 N1-25 N1‑021812 agreed 2002‑08‑07 IMS-CCR -
0140 2 F Rel-5 5.2.0 - Support of non-IMS forking - - - N1 N1-26 N1‑021928 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0140 2 F Rel-5 5.1.0 - Support of non-IMS forking NP-17 NP‑020481 rejected Erics/Lucent - - 2002‑07‑31 IMS-CCR -
0140 3 F Rel-5 5.2.0 - Support of non-IMS forking - - - N1 N1-27 N1‑022365 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0140 4 F Rel-5 5.2.0 5.3.0 Support of non-IMS forking NP-18 NP‑020558 approved N1 N1-27 N1‑022446 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0141 - F Rel-5 5.1.0 - Adding MESSAGE to 24.229 - - - N1 N1-25 N1‑021559 revised 2002‑07‑24 IMS-CCR -
0141 1 F Rel-5 5.1.0 - Adding MESSAGE to 24.229 NP-17 NP‑020375 revised N1 N1-25 N1‑021814 agreed 2002‑08‑07 IMS-CCR -
0141 2 F Rel-5 5.1.0 5.2.0 Adding MESSAGE to 24.229 NP-17 NP‑020489 approved - - - 2002‑09‑06 IMS-CCR Revision of NP-020375 CR#141r1
0142 - F Rel-5 5.1.0 5.2.0 Public user identity to use for third party register NP-17 NP‑020375 approved N1 N1-25 N1‑021563 agreed 2002‑07‑24 IMS-CCR -
0143 - F Rel-5 5.1.0 - Replace P-Original-Dialog-ID header with unique data in Route header - - - N1 N1-25 N1‑021564 revised 2002‑07‑24 IMS-CCR -
0143 1 F Rel-5 5.1.0 5.2.0 Replace P-Original-Dialog-ID header with unique data in Route header NP-17 NP‑020375 approved N1 N1-25 N1‑021797 agreed 2002‑08‑07 IMS-CCR -
0144 - F Rel-5 5.1.0 - Identification of supported IETF drafts within this release - - - N1 N1-25 N1‑021568 - 2002‑07‑24 IMS-CCR -
0144 1 F Rel-5 5.2.0 - Identification of supported IETF drafts within this release - - - N1 N1-26 N1‑021917 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0144 2 F Rel-5 5.2.0 5.3.0 Identification of supported IETF drafts within this release NP-18 NP‑020565 approved N1 N1-26 N1‑022114 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0145 - F Rel-5 5.1.0 5.2.0 Synchronize text with latest I-D for P-headers for charging NP-17 NP‑020375 approved N1 N1-25 N1‑021569 agreed 2002‑07‑24 IMS-CCR -
0146 - F Rel-5 5.1.0 - Service profiles and implicitly registered public user identities - - - N1 N1-25 N1‑021570 revised 2002‑07‑24 IMS-CCR -
0146 1 F Rel-5 5.1.0 - Service profiles and implicitly registered public user identities NP-17 NP‑020375 revised N1 N1-25 N1‑021815 agreed 2002‑08‑07 IMS-CCR -
0146 2 F Rel-5 5.1.0 5.2.0 Service profiles and implicitly registered public user identities NP-17 NP‑020488 approved - - - 2002‑08‑07 IMS-CCR Revision of NP-020375 CR#146r1
0147 - F Rel-5 5.1.0 5.2.0 S-CSCF decides when to include IOI NP-17 NP‑020376 approved N1 N1-25 N1‑021571 agreed 2002‑07‑24 IMS-CCR -
0148 - F Rel-5 5.1.0 5.2.0 Clean up XML in clause 7.6 NP-17 NP‑020376 approved N1 N1-25 N1‑021572 agreed 2002‑07‑24 IMS-CCR -
0149 - F Rel-5 5.1.0 5.2.0 Fix clause 5.2.7.4 header NP-17 NP‑020376 approved N1 N1-25 N1‑021573 agreed 2002‑07‑24 IMS-CCR -
0150 - F Rel-5 5.1.0 5.2.0 Removal of forward reference to non P-CSCF procedures NP-17 NP‑020376 approved N1 N1-25 N1‑021589 agreed 2002‑07‑24 IMS-CCR -
0151 - F Rel-5 5.1.0 5.2.0 Deregistration of public user identities NP-17 NP‑020376 approved N1 N1-25 N1‑021590 agreed 2002‑07‑24 IMS-CCR -
0151 1 F Rel-5 5.1.0 - Deregistration of public user identities - - - N1 N1-25 N1‑021795 withdrawn 2002‑08‑07 IMS-CCR -
0152 - F Rel-5 5.1.0 5.2.0 Reauthentication trigger via other means NP-17 NP‑020376 approved N1 N1-25 N1‑021591 agreed 2002‑07‑24 IMS-CCR -
0153 - F Rel-5 5.1.0 - Registration with intergrity protection - - - N1 N1-25 N1‑021592 revised 2002‑07‑24 IMS-CCR -
0153 1 F Rel-5 5.1.0 - Registration with intergrity protection NP-17 NP‑020379 withdrawn N1 N1-25 N1‑021792 agreed 2002‑08‑07 IMS-CCR replaced by 335
0153 2 F Rel-5 5.1.0 - Registration with intergrity protection NP-17 NP‑020335 revised N1 - - 2002‑08‑07 IMS-CCR Brought directly to plenary as alternative (rev2) CR to 153r1.
0153 3 F Rel-5 5.1.0 5.2.0 Registration with intergrity protection NP-17 NP‑020487 approved - - - 2002‑09‑06 IMS-CCR Revision of NP-020335
0154 - F Rel-5 5.1.0 - Explicit listing of need to route response messages - - - N1 N1-25 N1‑021593 revised 2002‑07‑24 IMS-CCR -
0154 1 F Rel-5 5.1.0 - Explicit listing of need to route response messages NP-17 NP‑020377 revised N1 N1-25 N1‑021801 agreed 2002‑08‑07 IMS-CCR -
0154 2 F Rel-5 5.1.0 5.2.0 Explicit listing of need to route response messages NP-17 NP‑020485 approved N1 - - 2002‑08‑07 IMS-CCR -
0155 - F Rel-5 5.1.0 - Specify abnormal cases for standalone transactions - - - N1 N1-25 N1‑021594 rejected 2002‑07‑24 IMS-CCR -
0156 - F Rel-5 5.1.0 - Fix format and use of GPRS Charging Information - - - N1 N1-25 N1‑021598 rejected 2002‑07‑24 IMS-CCR -
0157 - F Rel-5 5.1.0 - Include IP address in ICID - - - N1 N1-25 N1‑021599 revised 2002‑07‑24 IMS-CCR -
0157 1 F Rel-5 5.1.0 5.2.0 Include IP address in ICID NP-17 NP‑020377 approved N1 N1-25 N1‑021816 agreed 2002‑08‑07 IMS-CCR -
0158 - F Rel-5 5.1.0 5.2.0 Reference updates NP-17 NP‑020377 approved N1 N1-25 N1‑021604 agreed 2002‑07‑24 IMS-CCR -
0159 - F Rel-5 5.1.0 5.2.0 Abbreviation updates NP-17 NP‑020377 approved N1 N1-25 N1‑021605 agreed 2002‑07‑24 IMS-CCR -
0160 - F Rel-5 5.1.0 - Clause 4.5 revisions and tidy up - - - N1 N1-25 N1‑021606 - 2002‑07‑24 IMS-CCR -
0161 - F Rel-5 5.1.0 - Clarifications and editorials to SIP profile - - - N1 N1-25 N1‑021607 - 2002‑07‑24 IMS-CCR -
0161 1 F Rel-5 5.2.0 - Clarifications and editorials to SIP profile - - - N1 N1-26 N1‑021918 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0161 2 F Rel-5 5.2.0 - Clarifications and editorials to SIP profile - - - N1 N1-26 N1‑022056 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0161 3 F Rel-5 5.2.0 5.3.0 Clarifications and editorials to SIP profile NP-18 NP‑020558 approved N1 N1-27 N1‑022412 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0162 - F Rel-5 5.1.0 - Revisions to message body contents in SIP profile - - - N1 N1-25 N1‑021608 withdrawn 2002‑07‑24 IMS-CCR -
0163 - F Rel-5 5.1.0 - Clarifications of allocation of IP address - - - N1 N1-25 N1‑021624 revised 2002‑07‑24 IMS-CCR -
0163 1 F Rel-5 5.1.0 5.2.0 Clarifications of allocation of IP address NP-17 NP‑020377 approved N1 N1-25 N1‑021817 agreed 2002‑08‑07 IMS-CCR -
0164 - F Rel-5 5.1.0 - Clarifications of retrieval of CCF and/or ECF addresses - - - N1 N1-25 N1‑021625 postponed 2002‑07‑24 IMS-CCR -
0165 - F Rel-5 5.1.0 - Editorials for GPRS Charging ID - - - N1 N1-25 N1‑021626 rejected 2002‑07‑24 IMS-CCR -
0166 - F Rel-5 5.1.0 - Network Initiated De-Registration at S-CSCF - Sequence of Procedures - - - N1 N1-25 N1‑021658 revised 2002‑07‑24 IMS-CCR -
0166 1 F Rel-5 5.1.0 - Network Initiated De-Registration at S-CSCF - Sequence of Procedures - - - N1 N1-25 N1‑021796 withdrawn 2002‑08‑07 IMS-CCR -
0167 - F Rel-5 5.1.0 - P-CSCF checks SA in MTC - - - N1 N1-25 N1‑021659 - 2002‑07‑24 IMS-CCR -
0168 - F Rel-5 5.1.0 - Terminate SUBSCRIBE dialogs by CSCFs - - - N1 N1-25 N1‑021660 rejected 2002‑07‑24 IMS-CCR -
0169 - F Rel-5 5.1.0 - Redirection of SUBSCRIBE dialogs after users registration - - - N1 N1-25 N1‑021661 revised 2002‑07‑24 IMS-CCR -
0169 1 F Rel-5 5.1.0 - Redirection of SUBSCRIBE dialogs after users registration NP-17 NP‑020377 rejected N1 N1-25 N1‑021780 agreed 2002‑08‑07 IMS-CCR Replaced by new CR making the same change! (NP-020484.
0170 - F Rel-5 5.1.0 - I-CSCF (THIG) handling of P-Service-Route and Path - - - N1 N1-25 N1‑021662 rejected 2002‑07‑24 IMS-CCR -
0171 - F Rel-5 5.1.0 - Verifications at the P-CSCF for subsequent request - - - N1 N1-25 N1‑021663 revised 2002‑07‑24 IMS-CCR -
0171 1 F Rel-5 5.1.0 5.2.0 Verifications at the P-CSCF for subsequent request NP-17 NP‑020377 approved N1 N1-25 N1‑021802 agreed 2002‑08‑07 IMS-CCR -
0172 - F Rel-5 5.1.0 - Clarifications in support for tel URL - - - N1 N1-25 N1‑021667 postponed 2002‑07‑24 IMS-CCR -
0173 - F Rel-5 5.1.0 - Support of comp=sigcomp parameter - - - N1 N1-25 N1‑021668 rejected 2002‑07‑24 IMS-CCR -
0174 - F Rel-5 5.1.0 - Clarification of IMS signalling flag - - - N1 N1-25 N1‑021672 revised 2002‑07‑24 IMS-CCR -
0174 1 F Rel-5 5.1.0 5.2.0 Clarification of IMS signalling flag NP-17 NP‑020377 approved N1 N1-25 N1‑021781 agreed 2002‑08‑07 IMS-CCR -
0175 - F Rel-5 5.1.0 - Clarifications of the binding and media grouping - - - N1 N1-25 N1‑021675 postponed 2002‑07‑24 IMS-CCR -
0175 1 F Rel-5 5.2.0 - Clarifications of the binding and media grouping - - - N1 N1-26 N1‑021956 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0175 2 F Rel-5 5.2.0 - Clarifications of the binding and media grouping - - - N1 N1-26 N1‑022103 postponed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0175 3 F Rel-5 5.2.0 - Clarifications of the binding and media grouping - - - N1 N1-27 N1‑022280 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0175 4 F Rel-5 5.2.0 - Clarifications of the binding and media grouping - - - N1 N1-27 N1‑022443 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0175 5 F Rel-5 5.2.0 5.3.0 Clarifications of the binding and media grouping NP-18 NP‑020558 approved N1 N1-27 N1‑022494 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0176 - F Rel-5 5.1.0 - Definition of a general-purpose PDP context for IMS - - - N1 N1-25 N1‑021676 revised 2002‑07‑24 IMS-CCR -
0176 1 F Rel-5 5.1.0 5.2.0 Definition of a general-purpose PDP context for IMS NP-17 NP‑020377 approved N1 N1-25 N1‑021783 agreed 2002‑08‑07 IMS-CCR -
0177 - F Rel-5 5.1.0 - Request for DNS IPv6 server address - - - N1 N1-25 N1‑021677 revised 2002‑07‑24 IMS-CCR -
0177 1 F Rel-5 5.1.0 - Request for DNS IPv6 server address - - - N1 N1-25 N1‑021784 revised 2002‑08‑07 IMS-CCR -
0177 2 F Rel-5 5.1.0 5.2.0 Request for DNS IPv6 server address NP-17 NP‑020372 approved N1 N1-25 N1‑021833 agreed 2002‑08‑07 IMS-CCR -
0178 - F Rel-5 5.1.0 5.2.0 Error cases for PDP context modification NP-17 NP‑020378 approved N1 N1-25 N1‑021679 agreed 2002‑07‑24 IMS-CCR -
0178 1 F Rel-5 5.1.0 - Error cases for PDP context modification - - - N1 N1-25 N1‑021839 withdrawn 2002‑08‑07 IMS-CCR -
0179 - F Rel-5 5.1.0 - Support of originating requests from Application Servers - - - N1 N1-25 N1‑021697 withdrawn 2002‑07‑24 IMS-CCR -
0179 1 F Rel-5 5.2.0 - Support of originating requests from Application Servers - - - N1 N1-26 N1‑021992 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0179 2 F Rel-5 5.2.0 5.3.0 Support of originating requests from Application Servers NP-18 NP‑020558 approved N1 N1-26 N1‑022106 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0180 - F Rel-5 5.1.0 - Clarification on Sh interface for charging purposes - - - N1 N1-25 N1‑021701 rejected 2002‑07‑24 IMS-CCR -
0181 - F Rel-5 5.1.0 - Clarification on location information for IMS - - - N1 N1-25 N1‑021702 rejected 2002‑07‑24 IMS-CCR -
0182 - F Rel-5 5.1.0 - Clarification on specialized charging server - - - N1 N1-25 N1‑021703 rejected 2002‑07‑24 IMS-CCR -
0183 - F Rel-5 5.1.0 - Incorporation of draft-ietf-sip-sec-agree-04.txt - - - N1 N1-25 N1‑021706 revised 2002‑07‑24 IMS-CCR -
0183 1 F Rel-5 5.1.0 5.2.0 Incorporation of draft-ietf-sip-sec-agree-04.txt NP-17 NP‑020378 approved N1 N1-25 N1‑021791 agreed 2002‑08‑07 IMS-CCR -
0184 - F Rel-5 5.1.0 - Registration procedures at S-CSCF - - - N1 N1-25 N1‑021707 withdrawn 2002‑07‑24 IMS-CCR -
0185 - F Rel-5 5.1.0 - User Initiated De-registration - - - N1 N1-25 N1‑021708 revised 2002‑07‑24 IMS-CCR -
0185 1 F Rel-5 5.1.0 5.2.0 User Initiated De-registration NP-17 NP‑020378 approved N1 N1-25 N1‑021787 agreed 2002‑08‑07 IMS-CCR -
0186 - F Rel-5 5.1.0 - Mobile initiated de-registration - - - N1 N1-25 N1‑021709 revised 2002‑07‑24 IMS-CCR -
0186 1 F Rel-5 5.1.0 5.2.0 Mobile initiated de-registration NP-17 NP‑020378 approved N1 N1-25 N1‑021788 agreed 2002‑08‑07 IMS-CCR -
0187 - F Rel-5 5.1.0 - CallID of REGISTER requests - - - N1 N1-25 N1‑021710 revised 2002‑07‑24 IMS-CCR -
0187 1 F Rel-5 5.1.0 5.2.0 CallID of REGISTER requests NP-17 NP‑020378 approved N1 N1-25 N1‑021786 agreed 2002‑08‑07 IMS-CCR -
0188 - F Rel-5 5.1.0 - Correction to the I-CSCF routing procedures - - - N1 N1-25 N1‑021711 revised 2002‑07‑24 IMS-CCR -
0188 1 F Rel-5 5.1.0 5.2.0 Correction to the I-CSCF routing procedures NP-17 NP‑020378 approved N1 N1-25 N1‑021803 agreed 2002‑08‑07 IMS-CCR -
0189 - F Rel-5 5.1.0 - Registration procedures at P-CSCF - - - N1 N1-25 N1‑021713 revised 2002‑07‑24 IMS-CCR -
0189 1 F Rel-5 5.1.0 5.2.0 Registration procedures at P-CSCF NP-17 NP‑020378 approved N1 N1-25 N1‑021793 agreed 2002‑08‑07 IMS-CCR -
0190 - F Rel-5 5.1.0 - Handling of P-Media-Authorization header - - - N1 N1-25 N1‑021723 - 2002‑07‑24 IMS-CCR -
0190 1 F Rel-5 5.2.0 - Handling of P-Media-Authorization header - - - N1 N1-26 N1‑021896 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0190 2 F Rel-5 5.2.0 - Handling of P-Media-Authorization header - - - N1 N1-26 N1‑022113 withdrawn 2002‑10‑02 IMS-CCR - 2002‑11‑25
0191 - F Rel-5 5.1.0 - Backwards Compatibility improvements to IMS Signalling Flag - - - N1 N1-25 N1‑021725 - 2002‑07‑24 IMS-CCR -
0192 - F Rel-5 5.1.0 - Corrections related to the P-Access-Network-Info header - - - N1 N1-25 N1‑021733 revised 2002‑07‑24 IMS-CCR -
0192 1 F Rel-5 5.1.0 5.2.0 Corrections related to the P-Access-Network-Info header NP-17 NP‑020378 approved N1 N1-25 N1‑021827 agreed 2002‑08‑07 IMS-CCR -
0193 - F Rel-5 5.1.0 - Correction to Emergency Session handling in IMS - - - N1 N1-25 N1‑021734 revised 2002‑07‑24 IMS-CCR -
0193 1 F Rel-5 5.1.0 - Correction to Emergency Session handling in IMS - - - N1 N1-25 N1‑021804 withdrawn 2002‑08‑07 IMS-CCR -
0194 - F Rel-5 5.1.0 - Chapter to decribe the registration event - - - N1 N1-25 N1‑021735 revised 2002‑07‑24 IMS-CCR -
0194 1 F Rel-5 5.1.0 5.2.0 Chapter to decribe the registration event NP-17 NP‑020378 approved N1 N1-25 N1‑021794 agreed 2002‑08‑07 IMS-CCR -
0195 - F Rel-5 5.1.0 - Replacing the registration-state with the reg event package - - - N1 N1-25 N1‑021742 withdrawn 2002‑07‑24 IMS-CCR -
0196 - F Rel-5 5.1.0 5.2.0 Definition of IMS NP-17 NP‑020484 approved NP - - 2002‑08‑07 IMS-CCR Replaced by new CR making the same change! (NP-020484.
0197 - D Rel-5 5.2.0 5.3.0 Wrong references in 4.1 NP-18 NP‑020558 approved N1 N1-26 N1‑021902 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0198 - F Rel-5 5.2.0 5.3.0 Alignment of the MGCF procedures to RFC 3312 NP-18 NP‑020558 approved N1 N1-26 N1‑021903 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0199 - F Rel-5 5.2.0 - Service Route Header and Path Header interactions - - - N1 N1-26 N1‑021904 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0199 1 F Rel-5 5.2.0 5.3.0 Service Route Header and Path Header interactions NP-18 NP‑020558 approved N1 N1-26 N1‑022080 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0200 - F Rel-5 5.2.0 - Fixing a MESSAGE related typo - - - N1 N1-26 N1‑021905 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0201 - F Rel-5 5.2.0 - Minor correction to access-network-info header - - - N1 N1-26 N1‑021909 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0202 - F Rel-5 5.2.0 5.3.0 Addition of clause 6 though clause 9 references to conformance clause NP-18 NP‑020558 approved N1 N1-26 N1‑021919 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0203 - F Rel-5 5.2.0 - URL and address assignments - - - N1 N1-26 N1‑021920 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0203 1 F Rel-5 5.2.0 5.3.0 URL and address assignments NP-18 NP‑020558 approved N1 N1-26 N1‑022115 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0204 - F Rel-5 5.2.0 - Fix gprs-charging-info definition and descriptions - - - N1 N1-26 N1‑021925 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0204 1 F Rel-5 5.2.0 - Fix gprs-charging-info definition and descriptions - - - N1 N1-26 N1‑022079 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0204 2 F Rel-5 5.2.0 - Fix gprs-charging-info definition and descriptions - - - N1 N1-27 N1‑022378 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0204 3 F Rel-5 5.2.0 5.3.0 Fix gprs-charging-info definition and descriptions NP-18 NP‑020559 approved N1 N1-27 N1‑022426 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0205 - F Rel-5 5.2.0 - Fix ioi descriptions - - - N1 N1-26 N1‑021926 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0205 1 F Rel-5 5.2.0 - Fix ioi descriptions - - - N1 N1-26 N1‑022097 rejected 2002‑10‑02 IMS-CCR - 2002‑11‑25
0206 - F Rel-5 5.2.0 5.3.0 Alignment of the SDP attributes related to QoS integration with IETF NP-18 NP‑020559 approved N1 N1-26 N1‑021930 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0207 - F Rel-5 5.2.0 - Update of the 3GPP-generated SIP P- headers document references - - - N1 N1-26 N1‑021931 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0207 1 F Rel-5 5.2.0 5.3.0 Update of the 3GPP-generated SIP P- headers document references NP-18 NP‑020559 approved N1 N1-26 N1‑022116 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0208 - F Rel-5 5.2.0 - Handling of INVITE requests that do not contain SDP - - - N1 N1-26 N1‑021932 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0208 1 F Rel-5 5.2.0 5.3.0 Handling of INVITE requests that do not contain SDP NP-18 NP‑020559 approved N1 N1-26 N1‑022098 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0209 - F Rel-5 5.2.0 - UE Registration - - - N1 N1-26 N1‑021933 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0209 1 F Rel-5 5.2.0 - UE Registration - - - N1 N1-26 N1‑022081 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0209 2 F Rel-5 5.2.0 5.3.0 UE Registration NP-18 NP‑020559 approved N1 N1-27 N1‑022471 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0210 - F Rel-5 5.2.0 - P-Asserted-Identity header inserted by the UE - - - N1 N1-26 N1‑021934 rejected 2002‑09‑18 IMS-CCR - 2002‑11‑25
0211 - F Rel-5 5.2.0 - Usage of private user identity during registration - - - N1 N1-26 N1‑021935 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0211 1 F Rel-5 5.2.0 5.3.0 Usage of private user identity during registration NP-18 NP‑020559 approved N1 N1-26 N1‑022083 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0212 - F Rel-5 5.2.0 - P-CSCF subscription to the users registration-state event - - - N1 N1-26 N1‑021936 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0212 1 F Rel-5 5.2.0 5.3.0 P-CSCF subscription to the users registration-state event NP-18 NP‑020559 approved N1 N1-26 N1‑022084 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0213 - F Rel-5 5.2.0 - Handling of MT call by the P-CSCF - - - N1 N1-26 N1‑021937 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0213 1 F Rel-5 5.2.0 - Handling of MT call by the P-CSCF - - - N1 N1-26 N1‑022101 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0213 2 F Rel-5 5.2.0 5.3.0 Handling of MT call by the P-CSCF NP-18 NP‑020559 approved N1 N1-26 N1‑022154 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0214 - F Rel-5 5.2.0 - P-CSCF handling of P-Asserted-Identity header - - - N1 N1-26 N1‑021938 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0215 - F Rel-5 5.2.0 5.3.0 P-CSCF acting as a UA NP-18 NP‑020559 approved N1 N1-26 N1‑021939 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0216 - F Rel-5 5.2.0 - S-CSCF handling of protected registrations - - - N1 N1-26 N1‑021940 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0216 1 F Rel-5 5.2.0 5.3.0 S-CSCF handling of protected registrations NP-18 NP‑020559 approved N1 N1-26 N1‑022085 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0217 - F Rel-5 5.2.0 - S-CSCF handling of subscription to the users registration-state event - - - N1 N1-26 N1‑021941 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0217 1 F Rel-5 5.2.0 5.3.0 S-CSCF handling of subscription to the users registration-state event NP-18 NP‑020560 approved N1 N1-26 N1‑022086 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0218 - F Rel-5 5.2.0 - Determination of MO or MT in I-CSCF - - - N1 N1-26 N1‑021942 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0218 1 F Rel-5 5.2.0 5.3.0 Determination of MO or MT in I-CSCF NP-18 NP‑020560 approved N1 N1-26 N1‑022102 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0219 - F Rel-5 5.2.0 - Handling of default public user identities by the P-CSCF and S-CSCF - - - N1 N1-26 N1‑021943 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0220 - F Rel-5 5.2.0 5.3.0 Definition of the NAI and RTCP abbreviations NP-18 NP‑020560 approved N1 N1-26 N1‑021944 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0221 - F Rel-5 5.2.0 - Detach of terminals connected to IMS - - - N1 N1-26 N1‑021955 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0222 - F Rel-5 5.2.0 - Go related error codes in the UE - - - N1 N1-26 N1‑021957 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0222 1 F Rel-5 5.2.0 - Go related error codes in the UE - - - N1 N1-26 N1‑022105 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0222 2 F Rel-5 5.2.0 - Go related error codes in the UE - - - N1 N1-27 N1‑022281 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0222 3 F Rel-5 5.2.0 - Go related error codes in the UE - - - N1 N1-27 N1‑022442 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0222 4 F Rel-5 5.2.0 5.3.0 Go related error codes in the UE NP-18 NP‑020560 approved N1 N1-27 N1‑022495 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0223 - F Rel-5 5.2.0 - Clarifications on CCF/ECF addresses - - - N1 N1-26 N1‑021971 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0223 1 F Rel-5 5.2.0 5.3.0 Clarifications on CCF/ECF addresses NP-18 NP‑020560 approved N1 N1-26 N1‑022120 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0224 - F Rel-5 5.2.0 - Clarifications on AS role - - - N1 N1-26 N1‑021972 rejected 2002‑09‑18 IMS-CCR - 2002‑11‑25
0225 - F Rel-5 5.2.0 - Clarifications on dedicated PDP Context for IMS signaling - - - N1 N1-26 N1‑021973 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0225 1 F Rel-5 5.2.0 - Clarifications on dedicated PDP Context for IMS signaling - - - N1 N1-26 N1‑022121 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0225 2 F Rel-5 5.2.0 5.3.0 Clarifications on dedicated PDP Context for IMS signaling NP-18 NP‑020560 approved N1 N1-26 N1‑022156 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0226 - F Rel-5 5.2.0 - Clarifications on dedicated PDP Context for charging requirement - - - N1 N1-26 N1‑021974 rejected 2002‑09‑18 IMS-CCR - 2002‑11‑25
0227 - F Rel-5 5.2.0 - Clarifications of SDP for charging requirement - - - N1 N1-26 N1‑021975 postponed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0227 1 F Rel-5 5.2.0 - Clarifications of SDP for charging requirement - - - N1 N1-27 N1‑022316 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0227 2 F Rel-5 5.2.0 - Clarifications of SDP for charging requirement - - - N1 N1-27 N1‑022462 rejected 2002‑11‑20 IMS-CCR - 2002‑11‑25
0228 - F Rel-5 5.2.0 - Clarifications on the use of charging correlation information - - - N1 N1-26 N1‑021981 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0228 1 F Rel-5 5.2.0 - Clarifications on the use of charging correlation information - - - N1 N1-26 N1‑022123 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0228 2 F Rel-5 5.2.0 - Clarifications on the use of charging correlation information - - - N1 N1-26 N1‑022157 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0228 3 F Rel-5 5.2.0 5.3.0 Clarifications on the use of charging correlation information NP-18 NP‑020560 approved N1 N1-27 N1‑022425 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0229 - F Rel-5 5.2.0 - Clarifications on MESSAGE for charging requirement - - - N1 N1-26 N1‑021982 rejected 2002‑09‑18 IMS-CCR - 2002‑11‑25
0230 - F Rel-5 5.2.0 - Clarifications on AS procedures for charging requirement - - - N1 N1-26 N1‑021983 rejected 2002‑09‑18 IMS-CCR - 2002‑11‑25
0231 - F Rel-5 5.2.0 - Clarifications on UUS data for charging requirement - - - N1 N1-26 N1‑021984 withdrawn 2002‑09‑18 IMS-CCR - 2002‑11‑25
0232 - F Rel-5 5.2.0 - Expires information in REGISTER response - - - N1 N1-26 N1‑021987 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0232 1 F Rel-5 5.2.0 5.3.0 Expires information in REGISTER response NP-18 NP‑020560 approved N1 N1-26 N1‑022095 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0233 - F Rel-5 5.2.0 - on re-syncronisation of SIP compressor/de-compressor - - - N1 N1-26 N1‑021989 withdrawn 2002‑09‑18 IMS-CCR - 2002‑11‑25
0234 - C Rel-5 5.2.0 - Emergency service correction - - - N1 N1-26 N1‑021959 postponed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0235 - C Rel-5 5.2.0 - Indication of successful establishment of Dedicated Signalling PDP context to the UE - - - N1 N1-26 N1‑021953 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0235 1 C Rel-5 5.2.0 - Indication of successful establishment of Dedicated Signalling PDP context to the UE - - - N1 N1-26 N1‑022088 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0235 2 C Rel-5 5.2.0 5.3.0 Indication of successful establishment of Dedicated Signalling PDP context to the UE NP-18 NP‑020560 approved N1 N1-26 N1‑022129 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0236 - F Rel-5 5.2.0 - Alignment of UE with SIP UA funtions including Path header and Service-Route header support - - - N1 N1-26 N1‑021994 postponed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0236 1 F Rel-5 5.2.0 - Alignment of UE with SIP UA funtions including Path header and Service-Route header support - - - N1 N1-27 N1‑022368 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0237 - F Rel-5 5.2.0 5.3.0 P-CSCF sending 100 (Trying) Response for reINVITE NP-18 NP‑020560 approved N1 N1-26 N1‑021998 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0238 - F Rel-5 5.2.0 - P-CSCF shall not save Record-Route of refreshing requests - - - N1 N1-26 N1‑021999 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0238 1 F Rel-5 5.2.0 - P-CSCF shall not save Record-Route of refreshing requests - - - N1 N1-26 N1‑022124 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0238 2 F Rel-5 5.2.0 - P-CSCF shall not save Record-Route of refreshing requests - - - N1 N1-27 N1‑022463 noted 2002‑11‑20 IMS-CCR - 2002‑11‑25
0239 - F Rel-5 5.2.0 - Correction on P-Asserted-Id, P-Preferred-Id, Remote-Party-ID - - - N1 N1-26 N1‑022017 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0239 1 F Rel-5 5.2.0 5.3.0 Correction on P-Asserted-Id, P-Preferred-Id, Remote-Party-ID NP-18 NP‑020561 approved N1 N1-26 N1‑022100 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0240 - F Rel-5 5.2.0 - Clarifications to subclause 9.2.5 - - - N1 N1-26 N1‑022104 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0240 1 F Rel-5 5.2.0 5.3.0 Clarifications to subclause 9.2.5 NP-18 NP‑020561 approved N1 N1-26 N1‑022137 agreed 2002‑10‑02 IMS-CCR Reopened as N1-022276. 2002‑11‑25
0240 2 F Rel-5 5.2.0 - Clarifications to subclause 9.2.5 - - - N1 N1-27 N1‑022276 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0241 - F Rel-5 5.2.0 - Corrections on P-CSCF behaviour: handling the Record-Route, Route header fields - - - N1 N1-26 N1‑022019 postponed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0241 1 F Rel-5 5.2.0 - Corrections on P-CSCF behaviour: handling the Record-Route, Route header fields - - - N1 N1-27 N1‑022395 noted 2002‑11‑06 IMS-CCR - 2002‑11‑25
0242 - F Rel-5 5.2.0 5.3.0 ENUM translation NP-18 NP‑020561 approved N1 N1-26 N1‑022020 agreed 2002‑09‑18 IMS-CCR - 2002‑11‑25
0243 - F Rel-5 5.2.0 - AS routing - - - N1 N1-26 N1‑022026 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0243 1 F Rel-5 5.2.0 5.3.0 AS routing NP-18 NP‑020561 approved N1 N1-26 N1‑022107 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0244 - F Rel-5 5.2.0 - Corrections to 5112 - - - N1 N1-26 N1‑022027 rejected 2002‑09‑18 IMS-CCR - 2002‑11‑25
0245 - F Rel-5 5.2.0 - Warning header - - - N1 N1-26 N1‑022028 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0245 1 F Rel-5 5.2.0 5.3.0 Warning header NP-18 NP‑020561 approved N1 N1-26 N1‑022108 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0246 - D Rel-5 5.2.0 - S-CSCF procedure tidyup - - - N1 N1-26 N1‑022032 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0246 1 D Rel-5 5.2.0 - S-CSCF procedure tidyup - - - N1 N1-26 N1‑022147 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0246 2 F Rel-5 5.2.0 - S-CSCF procedure tidyup - - - N1 N1-27 N1‑022371 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0246 3 F Rel-5 5.2.0 5.3.0 S-CSCF procedure tidyup NP-18 NP‑020561 approved N1 N1-27 N1‑022497 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0247 - F Rel-5 5.2.0 - P-CSCF procedure tidyup - - - N1 N1-26 N1‑022033 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0247 1 F Rel-5 5.2.0 5.3.0 P-CSCF procedure tidyup NP-18 NP‑020561 approved N1 N1-26 N1‑022125 agreed 2002‑10‑02 IMS-CCR - 2002‑11‑25
0248 - F Rel-5 5.2.0 - UE procedure tidyup - - - N1 N1-26 N1‑022034 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0248 1 F Rel-5 5.2.0 - UE procedure tidyup - - - N1 N1-26 N1‑022082 revised 2002‑10‑02 IMS-CCR - 2002‑11‑25
0248 2 F Rel-5 5.2.0 5.3.0 UE procedure tidyup NP-18 NP‑020561 approved N1 N1-27 N1‑022472 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0249 - F Rel-5 5.2.0 - MESSAGE corrections part 1 - - - N1 N1-26 N1‑022035 revised 2002‑09‑18 IMS-CCR - 2002‑11‑25
0249 1 F Rel-5 5.2.0 - MESSAGE corrections part 1 - - - N1 N1-26 N1‑022126 withdrawn 2002‑10‑02 IMS-CCR - 2002‑11‑25
0249 2 F Rel-5 5.2.0 - MESSAGE corrections part 1 - - - N1 N1-27 N1‑022346 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0249 3 F Rel-5 5.2.0 5.3.0 MESSAGE corrections part 1 NP-18 NP‑020561 approved N1 N1-27 N1‑022455 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0250 - F Rel-5 5.2.0 - MESSAGE corrections part 2 - - - N1 N1-26 N1‑022036 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0250 1 F Rel-5 5.2.0 - MESSAGE corrections part 2 - - - N1 N1-27 N1‑022347 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0250 2 F Rel-5 5.2.0 5.3.0 MESSAGE corrections part 2 NP-18 NP‑020561 approved N1 N1-27 N1‑022456 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0251 - F Rel-5 5.2.0 - Security association clarifications - - - N1 N1-26 N1‑022037 - 2002‑09‑18 IMS-CCR - 2002‑11‑25
0251 1 F Rel-5 5.2.0 - Security association clarifications - - - N1 N1-27 N1‑022348 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0251 2 F Rel-5 5.2.0 5.3.0 Security association clarifications NP-18 NP‑020562 approved N1 N1-27 N1‑022440 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0252 - F Rel-5 5.2.0 - The use of security association by the UE - - - N1 N1-27 N1‑022254 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0252 1 F Rel-5 5.2.0 5.3.0 The use of security association by the UE NP-18 NP‑020562 approved N1 N1-27 N1‑022433 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0253 - F Rel-5 5.2.0 - UE integrity protected re-registration - - - N1 N1-27 N1‑022255 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0253 1 F Rel-5 5.2.0 5.3.0 UE integrity protected re-registration NP-18 NP‑020562 approved N1 N1-27 N1‑022434 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0254 - F Rel-5 5.2.0 - P-CSCF handling of Contact header during registration - - - N1 N1-27 N1‑022256 rejected 2002‑11‑06 IMS-CCR - 2002‑11‑25
0255 - F Rel-5 5.2.0 - Handling of default public user identities by the P-CSCF - - - N1 N1-27 N1‑022257 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0255 1 F Rel-5 5.2.0 - Handling of default public user identities by the P-CSCF - - - N1 N1-27 N1‑022436 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0255 2 F Rel-5 5.2.0 - Handling of default public user identities by the P-CSCF - - - N1 N1-27 N1‑022490 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0255 3 F Rel-5 5.2.0 5.3.0 Handling of default public user identities by the P-CSCF NP-18 NP‑020562 approved N1 N1-27 N1‑022496 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0256 - F Rel-5 5.2.0 - Handling of default public user identities by the S-CSCF - - - N1 N1-27 N1‑022258 rejected 2002‑11‑06 IMS-CCR - 2002‑11‑25
0257 - F Rel-5 5.2.0 - S-CSCF handling of TEL URL - - - N1 N1-27 N1‑022259 rejected 2002‑11‑06 IMS-CCR - 2002‑11‑25
0258 - F Rel-5 5.2.0 - Handling of the SDP by S-CSCF when acting as a B2BUA - - - N1 N1-27 N1‑022260 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0259 - F Rel-5 5.2.0 - S-CSCF acting as a B2BUA - - - N1 N1-27 N1‑022261 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0260 - F Rel-5 5.2.0 - S-CSCF acting as a B2BUA - - - N1 N1-27 N1‑022262 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0261 - F Rel-5 5.2.0 - S-CSCF acting as a B2BUA for MO calls - - - N1 N1-27 N1‑022263 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0262 - F Rel-5 5.2.0 - S-CSCF acting as a B2BUA for MT calls - - - N1 N1-27 N1‑022264 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0263 - F Rel-5 5.2.0 5.3.0 Fixing ioi descriptions NP-18 NP‑020562 approved N1 N1-27 N1‑022266 agreed 2002‑11‑06 IMS-CCR - 2002‑11‑25
0264 - F Rel-5 5.2.0 - Fix descriptions for ECF/CCF addresses - - - N1 N1-27 N1‑022267 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0264 1 F Rel-5 5.2.0 5.3.0 Fix descriptions for ECF/CCF addresses NP-18 NP‑020562 approved N1 N1-27 N1‑022447 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0265 - F Rel-5 5.2.0 - Clarification on MGCF behaviour related to tel URL - - - N1 N1-27 N1‑022294 - 2002‑11‑06 IMS-CCR - 2002‑11‑25
0266 - F Rel-5 5.2.0 - Alignment with draft-ietf-sipping-reg-event-00 and clarification on network initiated deregistration - - - N1 N1-27 N1‑022296 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0266 1 F Rel-5 5.2.0 - Alignment with draft-ietf-sipping-reg-event-00 and clarification on network initiated deregistration - - - N1 N1-27 N1‑022438 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0266 2 F Rel-5 5.2.0 5.3.0 Alignment with draft-ietf-sipping-reg-event-00 and clarification on network initiated deregistration NP-18 NP‑020562 approved N1 N1-27 N1‑022493 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0267 - F Rel-5 5.2.0 - Correction to network initiated re-authentication procedure - - - N1 N1-27 N1‑022305 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0267 1 F Rel-5 5.2.0 5.3.0 Correction to network initiated re-authentication procedure NP-18 NP‑020563 approved N1 N1-27 N1‑022449 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0268 - F Rel-5 5.2.0 - Registration Expires Timer Default Setting - - - N1 N1-27 N1‑022307 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0268 1 F Rel-5 5.2.0 5.3.0 Registration Expires Timer Default Setting NP-18 NP‑020563 approved N1 N1-27 N1‑022439 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0269 - F Rel-5 5.2.0 - Clarification on Sh interface for charging purposes - - - N1 N1-27 N1‑022317 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0269 1 F Rel-5 5.2.0 5.3.0 Clarification on Sh interface for charging purposes NP-18 NP‑020563 approved N1 N1-27 N1‑022465 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0270 - F Rel-5 5.2.0 - Clarifications on the scope - - - N1 N1-27 N1‑022318 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0270 1 F Rel-5 5.2.0 - Clarifications on the scope - - - N1 N1-27 N1‑022466 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0270 2 F Rel-5 5.2.0 5.3.0 Clarifications on the scope NP-18 NP‑020563 approved N1 N1-27 N1‑022500 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0271 - F Rel-5 5.2.0 - Clarifications on the Application Server as UE - - - N1 N1-27 N1‑022319 withdrawn 2002‑11‑06 IMS-CCR - 2002‑11‑25
0272 - F Rel-5 5.2.0 - Clarifications on allocation of a default S-CSCF - - - N1 N1-27 N1‑022320 rejected 2002‑11‑06 IMS-CCR - 2002‑11‑25
0273 - F Rel-5 5.2.0 - Add charging info for SUBSCRIBE - - - N1 N1-27 N1‑022324 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0273 1 F Rel-5 5.2.0 5.3.0 Add charging info for SUBSCRIBE NP-18 NP‑020563 approved N1 N1-27 N1‑022467 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0274 - F Rel-5 5.2.0 - Profile revisions for RFC 3261 headers - - - N1 N1-27 N1‑022344 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0274 1 F Rel-5 5.2.0 5.3.0 Profile revisions for RFC 3261 headers NP-18 NP‑020563 approved N1 N1-27 N1‑022413 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0275 - F Rel-5 5.2.0 5.3.0 Consistency changes for SDP procedures at MGCF NP-18 NP‑020563 approved N1 N1-27 N1‑022345 agreed 2002‑11‑06 IMS-CCR - 2002‑11‑25
0276 - F Rel-5 5.2.0 5.3.0 Proxy support of PRACK NP-18 NP‑020563 approved N1 N1-27 N1‑022350 agreed 2002‑11‑06 IMS-CCR - 2002‑11‑25
0277 - F Rel-5 5.2.0 5.3.0 Clarification of transparent handling of parameters in profile NP-18 NP‑020563 approved N1 N1-27 N1‑022351 agreed 2002‑11‑06 IMS-CCR - 2002‑11‑25
0278 - F Rel-5 5.2.0 - P-CSCF does not strip away headers - - - N1 N1-27 N1‑022359 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0278 1 F Rel-5 5.2.0 - P-CSCF does not strip away headers - - - N1 N1-27 N1‑022473 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0278 2 F Rel-5 5.2.0 - P-CSCF does not strip away headers - - - N1 N1-27 N1‑022487 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0278 3 F Rel-5 5.2.0 - P-CSCF does not strip away headers NP-18 NP‑020566 revised N1 N1-27 N1‑022499 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0278 4 F Rel-5 5.2.0 5.3.0 P-CSCF does not strip away headers NP-18 NP‑020663 approved N1 N1-27 N1‑022499 agreed 2002‑11‑20 IMS-CCR conditionally approved 2002‑12‑05
0279 - F Rel-5 5.2.0 - Meaning of refresh request - - - N1 N1-27 N1‑022360 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0279 1 F Rel-5 5.2.0 5.3.0 Meaning of refresh request NP-18 NP‑020564 approved N1 N1-27 N1‑022444 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0280 - F Rel-5 5.2.0 5.3.0 Removal of Caller Preferences dependency NP-18 NP‑020564 approved N1 N1-27 N1‑022362 agreed 2002‑11‑06 IMS-CCR - 2002‑11‑25
0281 - F Rel-5 5.2.0 - P-Access-Network-Info clarifications - - - N1 N1-27 N1‑022363 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0281 1 F Rel-5 5.2.0 5.3.0 P-Access-Network-Info clarifications NP-18 NP‑020564 approved N1 N1-27 N1‑022445 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0282 - F Rel-5 5.2.0 5.3.0 Clarification on use of the From header by the UE NP-18 NP‑020564 approved N1 N1-27 N1‑022370 agreed 2002‑11‑06 IMS-CCR - 2002‑11‑25
0283 - F Rel-5 5.2.0 - Support of comp=sigcomp parameter - - - N1 N1-27 N1‑022373 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0283 1 F Rel-5 5.2.0 - Support of comp=sigcomp parameter - - - N1 N1-27 N1‑022458 rejected 2002‑11‑20 IMS-CCR - 2002‑11‑25
0283 2 F Rel-5 5.2.0 5.3.0 Support of comp=sigcomp parameter NP-18 NP‑020634 approved Dynamicsoft, Ericsson, Nokia, Motorola - - 2002‑11‑17 IMS-CCR - 2003‑01‑21
0284 - F Rel-5 5.2.0 - SDP media policy rejection - - - N1 N1-27 N1‑022374 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0284 1 F Rel-5 5.2.0 - SDP media policy rejection - - - N1 N1-27 N1‑022474 revised 2002‑11‑20 IMS-CCR - 2002‑11‑25
0284 2 F Rel-5 5.2.0 - SDP media policy rejection - - - N1 N1-27 N1‑022491 postponed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0284 3 F Rel-5 5.2.0 - SDP media policy rejection NP-18 NP‑020635 revised Dnmcsft et - - 2002‑11‑20 IMS-CCR - 2002‑12‑06
0284 4 F Rel-5 5.2.0 5.3.0 SDP media policy rejection NP-18 NP‑020668 approved Dnmcsft et - NP‑020668 - 2002‑12‑05 IMS-CCR conditionally approved 2002‑12‑06
0285 - F Rel-5 5.2.0 - Fallback for compression failure - - - N1 N1-27 N1‑022379 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0285 1 F Rel-5 5.2.0 5.3.0 Fallback for compression failure NP-18 NP‑020567 approved N1 N1-27 N1‑022481 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0286 - F Rel-5 5.2.0 - Compression failure - - - N1 N1-27 N1‑022380 noted 2002‑11‑06 IMS-CCR - 2002‑11‑25
0287 - F Rel-5 5.2.0 - SA related procedures - - - N1 N1-27 N1‑022382 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0287 1 F Rel-5 5.2.0 5.3.0 SA related procedures NP-18 NP‑020564 approved N1 N1-27 N1‑022459 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0288 - F Rel-5 5.2.0 - Default URI - - - N1 N1-27 N1‑022385 rejected 2002‑11‑06 IMS-CCR - 2002‑11‑25
0289 - F Rel-5 5.2.0 5.3.0 PCF to PDF NP-18 NP‑020557 approved N1 N1-27 N1‑022387 agreed 2002‑11‑06 IMS-CCR conditionally approved 2002‑11‑25
0290 - C Rel-5 5.2.0 - Emergency Service correction - - - N1 N1-27 N1‑022392 revised 2002‑11‑06 IMS-CCR - 2002‑11‑25
0290 1 C Rel-5 5.2.0 5.3.0 Emergency Service correction NP-18 NP‑020568 approved N1 N1-27 N1‑022461 agreed 2002‑11‑20 IMS-CCR - 2002‑11‑25
0291 - F Rel-5 5.3.0 5.4.0 Minor correction and consistency changes to general part of profile NP-19 NP‑030049 approved N1 N1-28 N1‑030012 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0292 - F Rel-5 5.3.0 5.4.0 SIP profile minor correction and consistency changes NP-19 NP‑030049 approved N1 N1-28 N1‑030013 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0293 - F Rel-5 5.3.0 - Network asserted identity procedure corrections for the UE - - - N1 N1-28 N1‑030017 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0293 1 F Rel-5 5.3.0 5.4.0 Network asserted identity procedure corrections for the UE NP-19 NP‑030049 approved N1 N1-28 N1‑030261 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0294 - F Rel-5 5.3.0 - Asserted identity inclusion in SIP profile - - - N1 N1-28 N1‑030018 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0294 1 F Rel-5 5.3.0 5.4.0 Asserted identity inclusion in SIP profile NP-19 NP‑030049 approved N1 N1-28 N1‑030300 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0295 - F Rel-5 5.3.0 - Security agreement inclusion in SIP profile - - - N1 N1-28 N1‑030022 - 2003‑02‑17 IMS-CCR - 2003‑02‑24
0295 1 F Rel-5 5.4.0 - Security agreement inclusion in SIP profile - - - N1 N1-29 N1‑030367 revised 2003‑05‑17 IMS-CCR -
0295 2 F Rel-5 5.4.0 - Security agreement inclusion in SIP profile - - - N1 N1-29 N1‑030497 postponed 2003‑05‑17 IMS-CCR -
0295 3 F Rel-5 5.4.0 - Security agreement inclusion in SIP profile - - - N1 N1-30 N1‑030737 revised 2003‑05‑28 IMS-CCR -
0295 4 F Rel-5 5.4.0 5.5.0 Security agreement inclusion in SIP profile NP-20 NP‑030275 approved N1 N1-30 N1‑030939 agreed 2003‑05‑28 IMS-CCR -
0296 - F Rel-5 5.3.0 5.4.0 Profile references relating to registration NP-19 NP‑030049 approved N1 N1-28 N1‑030023 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0297 - F Rel-5 5.3.0 - Reference corrections - - - N1 N1-28 N1‑030024 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0297 1 F Rel-5 5.3.0 - Reference corrections - - - N1 N1-28 N1‑030287 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0297 2 F Rel-5 5.3.0 5.4.0 Reference corrections NP-19 NP‑030049 approved N1 N1-28 N1‑030301 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0298 - F Rel-5 5.3.0 - S-CSCF general procedure corrections - - - N1 N1-28 N1‑030025 - 2003‑02‑17 IMS-CCR - 2003‑02‑24
0298 1 F Rel-5 5.4.0 - S-CSCF general procedure corrections - - - N1 N1-29 N1‑030368 - 2003‑05‑17 IMS-CCR -
0299 - C Rel-5 5.3.0 - Allowing IMS access with SIM - - - N1 N1-28 N1‑030027 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0299 1 C Rel-5 5.3.0 - Allowing IMS access with SIM - - - N1 N1-28 N1‑030186 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0299 2 C Rel-5 5.3.0 - Allowing IMS access with SIM NP-19 NP‑030053 rejected N1 N1-28 N1‑030258 agreed 2003‑02‑17 IMS-CCR dep on SA decision 2003‑02‑24
0300 - F Rel-5 5.3.0 - 488 message with a subset of allowed media parameters - - - N1 N1-28 N1‑030071 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0300 1 F Rel-5 5.3.0 5.4.0 488 message with a subset of allowed media parameters NP-19 NP‑030050 approved N1 N1-28 N1‑030245 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0301 - F Rel-5 5.3.0 - Handling of Emergency Numbers in P-CSCF - - - N1 N1-28 N1‑030080 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0301 1 F Rel-5 5.3.0 5.4.0 Handling of Emergency Numbers in P-CSCF NP-19 NP‑030050 approved N1 N1-28 N1‑030239 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0302 - F Rel-5 5.3.0 - Correction of the registration state event package - - - N1 N1-28 N1‑030094 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0302 1 F Rel-5 5.3.0 - Correction of the registration state event package - - - N1 N1-28 N1‑030220 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0302 2 F Rel-5 5.3.0 5.4.0 Correction of the registration state event package NP-19 NP‑030050 approved N1 N1-28 N1‑030268 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0303 - F Rel-5 5.3.0 - Contact header in initial registration - - - N1 N1-28 N1‑030096 rejected 2003‑02‑17 IMS-CCR - 2003‑02‑24
0304 - F Rel-5 5.3.0 - SAs lifetimes in P-CSCF - - - N1 N1-28 N1‑030097 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0304 1 F Rel-5 5.3.0 - SAs lifetimes in P-CSCF - - - N1 N1-28 N1‑030210 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0304 2 F Rel-5 5.3.0 - SAs lifetimes in P-CSCF - - - N1 N1-28 N1‑030280 postponed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0304 3 F Rel-5 5.4.0 - SAs lifetimes in P-CSCF - - - N1 N1-29 N1‑030354 revised 2003‑05‑17 IMS-CCR -
0304 4 F Rel-5 5.4.0 - SAs lifetimes in P-CSCF NP-20 NP‑030275 rejected N1 N1-29 N1‑030493 agreed 2003‑05‑17 IMS-CCR -
0305 - F Rel-5 5.3.0 - User initiated de-registration at P-CSCF - - - N1 N1-28 N1‑030098 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0305 1 F Rel-5 5.3.0 - User initiated de-registration at P-CSCF - - - N1 N1-28 N1‑030228 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0305 2 F Rel-5 5.3.0 5.4.0 User initiated de-registration at P-CSCF NP-19 NP‑030050 approved N1 N1-28 N1‑030295 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0306 - F Rel-5 5.3.0 - Network-initiated deregistration at S-CSCF. - - - N1 N1-28 N1‑030099 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0306 1 F Rel-5 5.3.0 - Network-initiated deregistration at S-CSCF. - - - N1 N1-28 N1‑030229 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0306 2 F Rel-5 5.3.0 5.4.0 Network-initiated deregistration at UE, P-CSCF, and S-CSCF NP-19 NP‑030050 approved N1 N1-28 N1‑030296 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0307 - F Rel-5 5.3.0 - UE deregistration during established dialogs - - - N1 N1-28 N1‑030100 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0307 1 F Rel-5 5.3.0 - UE deregistration during established dialogs - - - N1 N1-28 N1‑030231 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0307 2 F Rel-5 5.3.0 5.4.0 UE deregistration during established dialogs NP-19 NP‑030050 approved N1 N1-28 N1‑030297 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0308 - F Rel-5 5.3.0 - S-CSCF handling of deregistration during established dialogs - - - N1 N1-28 N1‑030101 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0308 1 F Rel-5 5.3.0 - S-CSCF handling of deregistration during established dialogs - - - N1 N1-28 N1‑030232 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0308 2 F Rel-5 5.3.0 5.4.0 S-CSCF handling of deregistration during established dialogs NP-19 NP‑030050 approved N1 N1-28 N1‑030298 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0309 - F Rel-5 5.3.0 - S-CSCF handling of established dialogs upon deregistration - - - N1 N1-28 N1‑030102 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0309 1 F Rel-5 5.3.0 5.4.0 S-CSCF handling of established dialogs upon deregistration NP-19 NP‑030050 approved N1 N1-28 N1‑030233 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0310 - F Rel-5 5.3.0 - S-CSCF handling of established dialogs upon registration-lifetime expiration - - - N1 N1-28 N1‑030103 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0310 1 F Rel-5 5.3.0 - S-CSCF handling of established dialogs upon registration-lifetime expiration - - - N1 N1-28 N1‑030234 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0310 2 F Rel-5 5.3.0 5.4.0 S-CSCF handling of established dialogs upon registration-lifetime expiration NP-19 NP‑030050 approved N1 N1-28 N1‑030299 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0311 - F Rel-5 5.3.0 - P-CSCF handling of established dialogs upon registration-lifetime expiration - - - N1 N1-28 N1‑030104 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0311 1 F Rel-5 5.3.0 5.4.0 P-CSCF handling of established dialogs upon registration-lifetime expiration NP-19 NP‑030051 approved N1 N1-28 N1‑030235 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0312 - F Rel-5 5.3.0 - Correction of Authentication procedure - - - N1 N1-28 N1‑030105 revised 2003‑02‑17 IMCCCR - 2003‑02‑24
0312 1 F Rel-5 5.3.0 5.4.0 Correction of Authentication procedure NP-19 NP‑030051 approved N1 N1-28 N1‑030240 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0313 - F Rel-5 5.3.0 5.4.0 Mixed Path header and Service-Route operation NP-19 NP‑030051 approved N1 N1-28 N1‑030127 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0314 - F Rel-5 5.3.0 - Clarifications on S-CSCF procedures for accessing AS - - - N1 N1-28 N1‑030130 rejected 2003‑02‑17 IMS_CCR - 2003‑02‑24
0315 - F Rel-5 5.3.0 - Clarifications on updating the authorization token - - - N1 N1-28 N1‑030131 revised 2003‑02‑17 IMS_CCR - 2003‑02‑24
0315 1 F Rel-5 5.3.0 - Clarifications on updating the authorization token - - - N1 N1-28 N1‑030215 revised 2003‑02‑17 IMS_CCR - 2003‑02‑24
0315 2 F Rel-5 5.3.0 5.4.0 Clarifications on updating the authorization token NP-19 NP‑030051 approved N1 N1-28 N1‑030255 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0316 - F Rel-5 5.3.0 - Clarification on ASs within Trusted domain - - - N1 N1-28 N1‑030132 rejected 2003‑02‑17 IMS_CCR - 2003‑02‑24
0317 - F Rel-5 5.3.0 - The principles of the usage of SIP/SDP - - - N1 N1-28 N1‑030133 rejected 2003‑02‑17 IMS_CCR - 2003‑02‑24
0318 - F Rel-5 5.3.0 - Consideration of P-CSCF/PDF - - - N1 N1-28 N1‑030134 revised 2003‑02‑17 IMS_CCR - 2003‑02‑24
0318 1 F Rel-5 5.3.0 - Consideration of P-CSCF/PDF - - - N1 N1-28 N1‑030264 revised 2003‑02‑17 IMS_CCR - 2003‑02‑24
0318 2 F Rel-5 5.3.0 5.4.0 Consideration of P-CSCF/PDF NP-19 NP‑030051 approved N1 N1-28 N1‑030307 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0319 - F Rel-5 5.3.0 - Clarification on GPRS charging information - - - N1 N1-28 N1‑030135 revised 2003‑02‑17 IMS_CCR - 2003‑02‑24
0319 1 F Rel-5 5.3.0 - Clarification on GPRS charging information - - - N1 N1-28 N1‑030265 revised 2003‑02‑17 IMS_CCR - 2003‑02‑24
0319 2 F Rel-5 5.3.0 5.4.0 Clarification on GPRS charging information NP-19 NP‑030051 approved N1 N1-28 N1‑030308 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0320 - F Rel-5 5.3.0 - Clarifications of media flow procedure - - - N1 N1-28 N1‑030136 rejected 2003‑02‑17 IMS_CCR - 2003‑02‑24
0321 - F Rel-5 5.3.0 - Signalling PDP Context Indication to Core Network - - - N1 N1-28 N1‑030141 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0321 1 F Rel-5 5.3.0 - Signalling PDP Context Indication to Core Network - - - N1 N1-28 N1‑030205 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0321 2 F Rel-5 5.3.0 - Signalling PDP Context Indication to Core Network NP-19 NP‑030054 rejected N1 N1-28 N1‑030267 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0322 - F Rel-5 5.3.0 - 3GPP P-header inclusion in SIP profile - - - N1 N1-28 N1‑030155 postponed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0322 1 F Rel-5 5.4.0 - 3GPP P-header inclusion in SIP profile - - - N1 N1-29 N1‑030380 withdrawn 2003‑05‑17 IMS-CCR -
0322 2 F Rel-5 5.4.0 - 3GPP P-header inclusion in SIP profile - - - N1 N1-29 N1‑030469 revised 2003‑05‑17 IMS-CCR -
0322 3 F Rel-5 5.4.0 - 3GPP P-header inclusion in SIP profile - - - N1 N1-29 N1‑030519 postponed 2003‑05‑17 IMS-CCR -
0322 4 F Rel-5 5.4.0 - 3GPP P-header inclusion in SIP profile - - - N1 N1-30 N1‑030750 revised 2003‑05‑28 IMS-CCR -
0322 5 F Rel-5 5.4.0 5.5.0 3GPP P-header inclusion in SIP profile NP-20 NP‑030275 approved N1 N1-30 N1‑030938 agreed 2003‑05‑28 IMS-CCR -
0323 - F Rel-5 5.3.0 - P-Access-Network-Info procedure corrections for the UE - - - N1 N1-28 N1‑030156 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0323 1 F Rel-5 5.3.0 5.4.0 P-Access-Network-Info procedure corrections for the UE NP-19 NP‑030051 approved N1 N1-28 N1‑030250 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0324 - F Rel-5 5.3.0 - P-Access-Network-Info procedure corrections for the S-CSCF - - - N1 N1-28 N1‑030157 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0324 1 F Rel-5 5.3.0 5.4.0 P-Access-Network-Info procedure corrections for the S-CSCF NP-19 NP‑030051 approved N1 N1-28 N1‑030251 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0325 - F Rel-5 5.3.0 - Usage of P-Asserted-Identity and P-Preferred-Identity headers - - - N1 N1-28 N1‑030158 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0325 1 F Rel-5 5.3.0 - Usage of P-Asserted-Identity and P-Preferred-Identity headers - - - N1 N1-28 N1‑030259 postponed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0326 - F Rel-5 5.3.0 - Updating user agent related profile tables - - - N1 N1-28 N1‑030159 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0326 1 F Rel-5 5.3.0 5.4.0 Updating user agent related profile tables NP-19 NP‑030051 approved N1 N1-28 N1‑030260 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0327 - F Rel-5 5.3.0 - Cleanup and clarification to the registration and authentication procedure - - - N1 N1-28 N1‑030171 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0327 1 F Rel-5 5.3.0 - Cleanup and clarification to the registration and authentication procedure - - - N1 N1-28 N1‑030241 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0327 2 F Rel-5 5.3.0 5.4.0 Cleanup and clarification to the registration and authentication procedure NP-19 NP‑030052 approved N1 N1-28 N1‑030282 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0328 - F Rel-5 5.3.0 - Corrections to the reg event package - - - N1 N1-28 N1‑030172 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0328 1 F Rel-5 5.3.0 5.4.0 Corrections to the reg event package NP-19 NP‑030052 approved N1 N1-28 N1‑030230 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0329 - F Rel-5 5.3.0 - Correction of SDP for the UE - - - N1 N1-28 N1‑030173 postponed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0329 1 F Rel-5 5.4.0 - Correction of SDP for the UE - - - N1 N1-30 N1‑030724 withdrawn 2003‑05‑28 IMS-CCR -
0330 - F Rel-5 5.3.0 - Clarifications for setting up separate PDP contexts in case of SBLP - - - N1 N1-28 N1‑030174 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0330 1 F Rel-5 5.3.0 - Clarifications for setting up separate PDP contexts in case of SBLP - - - N1 N1-28 N1‑030252 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0330 2 F Rel-5 5.3.0 5.4.0 Clarifications for setting up separate PDP contexts in case of SBLP NP-19 NP‑030052 approved N1 N1-28 N1‑030288 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0331 - F Rel-5 5.3.0 - Handling of the P-Media-Autohorization header - - - N1 N1-28 N1‑030175 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0331 1 F Rel-5 5.3.0 - Handling of the P-Media-Autohorization header - - - N1 N1-28 N1‑030254 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0331 2 F Rel-5 5.3.0 5.4.0 Handling of the P-Media-Autohorization header NP-19 NP‑030052 approved N1 N1-28 N1‑030289 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0332 - F Rel-5 5.3.0 - Change of IP address for the UE - - - N1 N1-28 N1‑030176 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0332 1 F Rel-5 5.3.0 - Change of IP address for the UE - - - N1 N1-28 N1‑030238 postponed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0332 2 F Rel-5 5.4.0 - Change of IP address for the UE - - - N1 N1-29 N1‑030427 postponed 2003‑05‑17 IMS-CCR -
0332 3 F Rel-5 5.4.0 - Change of IP address for the UE - - - N1 N1-30 N1‑030729 revised 2003‑05‑28 IMS-CCR -
0332 4 F Rel-5 5.4.0 - Change of IP address for the UE - - - N1 N1-30 N1‑030854 revised 2003‑05‑28 IMS-CCR -
0332 5 F Rel-5 5.4.0 5.5.0 Change of IP address for the UE NP-20 NP‑030275 approved N1 N1-30 N1‑030923 agreed 2003‑05‑28 IMS-CCR -
0333 - F Rel-5 5.3.0 - Removal of P-Asserted-Identity from clause 7 of 24.229 - - - N1 N1-28 N1‑030177 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0333 1 F Rel-5 5.3.0 - Removal of P-Asserted-Identity from clause 7 of 24.229 - - - N1 N1-28 N1‑030246 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0333 2 F Rel-5 5.3.0 - Removal of P-Asserted-Identity from clause 7 of 24.229 - - - N1 N1-28 N1‑030286 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0333 3 F Rel-5 5.3.0 5.4.0 Removal of P-Asserted-Identity from clause 7 of 24.229 NP-19 NP‑030052 approved N1 N1-28 N1‑030310 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0334 - F Rel-5 5.3.0 5.4.0 P-CSCF general procedure corrections NP-19 NP‑030052 approved N1 N1-28 N1‑030182 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0335 - F Rel-5 5.3.0 - Usage of Contact in UE's registration procedure - - - N1 N1-28 N1‑030191 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0335 1 F Rel-5 5.3.0 - Usage of Contact in UE's registration procedure - - - N1 N1-28 N1‑030222 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0335 2 F Rel-5 5.3.0 5.4.0 Usage of Contact in UE's registration procedure NP-19 NP‑030052 approved N1 N1-28 N1‑030281 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0336 - F Rel-5 5.3.0 - Correction related to MO/MT selection in S-CSCF - - - N1 N1-28 N1‑030192 withdrawn 2003‑02‑17 IMS-CCR - 2003‑02‑24
0337 - F Rel-5 5.3.0 5.4.0 Usage of P-Asserted-Identity for responses NP-19 NP‑030052 approved N1 N1-28 N1‑030193 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0338 - F Rel-5 5.3.0 - Addition of missing Privacy descriptions to 24.229 - - - N1 N1-28 N1‑030194 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0338 1 F Rel-5 5.3.0 - Addition of missing Privacy descriptions to 24.229 - - - N1 N1-28 N1‑030236 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0338 2 F Rel-5 5.3.0 - Addition of missing Privacy descriptions to 24.229 - - - N1 N1-28 N1‑030256 rejected 2003‑02‑17 IMS-CCR - 2003‑02‑24
0339 - F Rel-5 5.3.0 - Authorization for registration event package - - - N1 N1-28 N1‑030195 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0339 1 F Rel-5 5.3.0 - Authorization for registration event package - - - N1 N1-28 N1‑030244 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0339 2 F Rel-5 5.3.0 5.4.0 Authorization for registration event package NP-19 NP‑030052 approved N1 N1-28 N1‑030285 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0340 - F Rel-5 5.3.0 - Correction on S-CSCF behaviour when all public user identities of the UE has been deregistered - - - N1 N1-28 N1‑030196 rejected 2003‑02‑17 IMS-CCR - 2003‑02‑24
0341 - F Rel-5 5.3.0 - P-CSCF subscription to reg event - - - N1 N1-28 N1‑030243 revised 2003‑02‑17 IMS-CCR - 2003‑02‑24
0341 1 F Rel-5 5.3.0 5.4.0 P-CSCF subscription to reg event NP-19 NP‑030052 approved N1 N1-28 N1‑030284 agreed 2003‑02‑17 IMS-CCR - 2003‑02‑24
0342 - F Rel-5 5.4.0 5.5.0 Removal of the requirement for UE re-authentication initiated by HSS NP-20 NP‑030275 approved N1 N1-29 N1‑030349 agreed 2003‑05‑17 IMS-CCR -
0343 - F Rel-5 5.4.0 - UE behaviour on reception of 420 (Bad Extension) message - - - N1 N1-29 N1‑030350 revised 2003‑05‑17 IMS-CCR -
0343 1 F Rel-5 5.4.0 - UE behaviour on reception of 420 (Bad Extension) message - - - N1 N1-29 N1‑030507 revised 2003‑05‑17 IMS-CCR -
0343 2 F Rel-5 5.4.0 5.5.0 UE behaviour on reception of 420 (Bad Extension) message NP-20 NP‑030275 approved N1 N1-29 N1‑030552 agreed 2003‑05‑17 IMS-CCR -
0343 3 F Rel-5 5.4.0 - UE/network behaviour on reception of 420 (Bad Extension) message - - - N1 N1-30 N1‑030692 revised 2003‑05‑28 IMS-CCR -
0343 4 F Rel-5 5.4.0 - UE/network behaviour on reception of 420 (Bad Extension) message - - - N1 N1-30 N1‑030803 rejected 2003‑05‑28 IMS-CCR -
0344 - F Rel-5 5.4.0 - Setting the SA liftime at UE upon registration - - - N1 N1-29 N1‑030355 revised 2003‑05‑17 IMS-CCR -
0344 1 F Rel-5 5.4.0 - Setting the SA liftime at UE upon registration NP-20 NP‑030275 rejected N1 N1-29 N1‑030494 agreed 2003‑05‑17 IMS-CCR -
0345 - F Rel-5 5.4.0 - SA liftime upon UE initiated de-registration - - - N1 N1-29 N1‑030356 revised 2003‑05‑17 IMS-CCR -
0345 1 F Rel-5 5.4.0 - SA liftime upon UE initiated de-registration - - - N1 N1-29 N1‑030495 revised 2003‑05‑17 IMS-CCR -
0346 - F Rel-5 5.4.0 - SA liftime upon network initiated de-registration - - - N1 N1-29 N1‑030357 revised 2003‑05‑17 IMS-CCR -
0346 1 F Rel-5 5.4.0 - SA liftime upon network initiated de-registration NP-20 NP‑030275 rejected N1 N1-29 N1‑030496 agreed 2003‑05‑17 IMS-CCR -
0347 - F Rel-5 5.4.0 - Handling of DTMF - - - N1 N1-29 N1‑030385 revised 2003‑05‑17 IMS-CCR -
0347 1 F Rel-5 5.4.0 - Handling of DTMF - - - N1 N1-29 N1‑030508 revised 2003‑05‑17 IMS-CCR -
0347 2 F Rel-5 5.4.0 5.5.0 Handling of DTMF NP-20 NP‑030275 approved N1 N1-29 N1‑030551 agreed 2003‑05‑17 IMS-CCR -
0348 - F Rel-5 5.4.0 - Format of Tel URL in P-Asserted-Id - - - N1 N1-29 N1‑030386 revised 2003‑05‑17 IMS-CCR -
0348 1 F Rel-5 5.4.0 5.5.0 Format of Tel URL in P-Asserted-Id NP-20 NP‑030276 approved N1 N1-29 N1‑030510 agreed 2003‑05‑17 IMS-CCR -
0349 - F Rel-5 5.4.0 5.5.0 Delete Note on header stripping/SDP manipulation NP-20 NP‑030276 approved N1 N1-29 N1‑030387 agreed 2003‑05‑17 IMS-CCR -
0350 - F Rel-5 5.4.0 - Clarifications on ICID for REGISTER - - - N1 N1-29 N1‑030397 postponed 2003‑05‑17 IMS-CCR -
0350 1 F Rel-5 5.4.0 - Clarifications on ICID for REGISTER - - - N1 N1-30 N1‑030691 postponed 2003‑05‑28 IMS-CCR -
0351 - F Rel-5 5.4.0 - Clarifications on S-CSCF procedures for iFC - - - N1 N1-29 N1‑030398 postponed 2003‑05‑17 IMS-CCR -
0352 - F Rel-5 5.4.0 - Clarifications on barring public user identity - - - N1 N1-29 N1‑030399 rejected 2003‑05‑17 IMS-CCR -
0353 - F Rel-5 5.4.0 - Clarification on determination of mobile originated call - - - N1 N1-29 N1‑030400 rejected 2003‑05‑17 IMS-CCR -
0354 - F Rel-5 5.4.0 - Clarifications on using DNS procedures - - - N1 N1-29 N1‑030401 revised 2003‑05‑17 IMS-CCR -
0354 1 F Rel-5 5.4.0 5.5.0 Clarifications on using DNS procedures NP-20 NP‑030276 approved N1 N1-29 N1‑030520 agreed 2003‑05‑17 IMS-CCR -
0355 - F Rel-5 5.4.0 - Clarifications on general purpose PDP context - - - N1 N1-29 N1‑030402 rejected 2003‑05‑17 IMS-CCR -
0356 - F Rel-5 5.4.0 - Addition of procedures at the AS for SDP - - - N1 N1-29 N1‑030403 revised 2003‑05‑17 IMS-CCR -
0356 1 F Rel-5 5.4.0 - Addition of procedures at the AS for SDP - - - N1 N1-29 N1‑030514 postponed 2003‑05‑17 IMS-CCR -
0356 2 F Rel-5 5.4.0 - Addition of procedures at the AS for SDP - - - N1 N1-30 N1‑030694 revised 2003‑05‑28 IMS-CCR -
0356 3 F Rel-5 5.4.0 - Addition of procedures at the AS for SDP - - - N1 N1-30 N1‑030850 revised 2003‑05‑28 IMS_CCR -
0356 4 F Rel-5 5.4.0 5.5.0 Addition of procedures at the AS for SDP NP-20 NP‑030276 approved N1 N1-30 N1‑030942 agreed 2003‑05‑28 IMS-CCR -
0357 - F Rel-5 5.4.0 - Usage of P-Associated-URI - - - N1 N1-29 N1‑030407 revised 2003‑05‑17 IMS-CCR -
0357 1 F Rel-5 5.4.0 5.5.0 Usage of P-Associated-URI NP-20 NP‑030276 approved N1 N1-29 N1‑030499 agreed 2003‑05‑17 IMS-CCR -
0358 - F Rel-5 5.4.0 - User initiated de-registration at P-CSCF - - - N1 N1-29 N1‑030409 revised 2003‑05‑17 IMS-CCR -
0358 1 F Rel-5 5.4.0 - User initiated de-registration at P-CSCF - - - N1 N1-29 N1‑030500 revised 2003‑05‑17 IMS-CCR -
0358 2 F Rel-5 5.4.0 - User initiated de-registration at P-CSCF NP-20 NP‑030296 revised N1 N1-29 N1‑030558 revised 2003‑05‑17 IMS-CCR CN#20 decided to fall back
0359 - F Rel-5 5.4.0 - Network-initiated deregistration at UE and P-CSCF - - - N1 N1-29 N1‑030410 revised 2003‑05‑17 IMS-CCR -
0359 1 F Rel-5 5.4.0 5.5.0 Network-initiated deregistration at UE and P-CSCF NP-20 NP‑030276 approved N1 N1-29 N1‑030501 agreed 2003‑05‑17 IMS-CCR -
0360 - F Rel-5 5.4.0 - Barred identities - - - N1 N1-29 N1‑030411 revised 2003‑05‑17 IMS-CCR -
0360 1 F Rel-5 5.4.0 - Barred identities - - - N1 N1-29 N1‑030511 revised 2003‑05‑17 IMS-CCR -
0360 2 F Rel-5 5.4.0 5.5.0 Barred identities NP-20 NP‑030276 approved N1 N1-29 N1‑030550 agreed 2003‑05‑17 IMS-CCR -
0361 - F Rel-5 5.4.0 - SA lifetime - - - N1 N1-29 N1‑030412 rejected 2003‑05‑17 IMS-CCR -
0362 - F Rel-5 5.4.0 - User initiated de-registration - - - N1 N1-29 N1‑030413 revised 2003‑05‑17 IMS-CCR -
0362 1 F Rel-5 5.4.0 - User initiated de-registration - - - N1 N1-29 N1‑030503 revised 2003‑05‑17 IMS-CCR -
0362 2 F Rel-5 5.4.0 - User initiated de-registration NP-20 NP‑030291 rejected Nokia - N1‑030559 - 2003‑03‑24 IMS-CCR - 2003‑06‑06
0362 2 F Rel-5 5.4.0 - User initiated de-registration NP-20 NP‑030296 revised N1 N1-29 N1‑030559 revised 2003‑05‑17 IMS-CCR CN#20 decided to fall back
0362 2 F Rel-5 5.4.0 - User initiated de-registration NP-20 SP‑030259 revised Nokia - N1‑030559 - 2003‑03‑24 IMS-CCR - 2003‑06‑06
0363 - F Rel-5 5.4.0 - P-CSCF initiated call release with BYE - - - N1 N1-29 N1‑030417 rejected 2003‑05‑17 IMS-CCR -
0364 - F Rel-5 5.4.0 - Clarifications on service key - - - N1 N1-29 N1‑030424 rejected 2003‑05‑17 IMS-CCR -
0365 - F Rel-5 5.4.0 - PDP contex subject to SBLP cannot be reused by other IMS sessions - - - N1 N1-29 N1‑030428 revised 2003‑05‑17 IMS-CCR -
0365 1 F Rel-5 5.4.0 5.5.0 PDP contex subject to SBLP cannot be reused by other IMS sessions NP-20 NP‑030276 approved N1 N1-29 N1‑030513 agreed 2003‑05‑17 IMS-CCR -
0366 - F Rel-5 5.4.0 - Alignment of security header procedures with RFC 3329 - - - N1 N1-29 N1‑030438 revised 2003‑05‑17 IMS-CCR -
0366 1 F Rel-5 5.4.0 - Alignment of security header procedures with RFC 3329 - - - N1 N1-29 N1‑030505 postponed 2003‑05‑17 IMS-CCR -
0366 2 F Rel-5 5.4.0 - Alignment of security header procedures with RFC 3329 - - - N1 N1-29 N1‑030561 withdrawn 2003‑05‑17 IMS-CCR -
0366 2 F Rel-5 5.4.0 - Alignment of security header procedures with RFC 3329 - - - N1 N1-30 N1‑030738 - 2003‑05‑28 IMS-CCR -
0366 3 - Rel-5 5.5.0 - Alignment of security header procedures with RFC 3329 - - - N1 N1-31 N1‑031156 - 2003‑09‑12 IMS-CCR -
0367 - F Rel-5 5.4.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-29 N1‑030441 postponed 2003‑05‑17 IMS-CCR -
0367 1 F Rel-5 5.4.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-30 N1‑030741 postponed 2003‑05‑28 IMS-CCR -
0367 2 - Rel-5 5.5.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-31 N1‑031158 - 2003‑09‑12 IMS-CCR -
0367 3 F Rel-5 5.6.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-32 N1‑031348 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0367 4 F Rel-5 5.6.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-32 N1‑031628 - 2003‑11‑03 IMS-CCR - 2004‑01‑05
0367 5 F Rel-5 5.7.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-33 N1‑040312 revised 2004‑02‑23 IMS-CCR -
0367 6 F Rel-5 5.7.0 5.8.0 Completion of major capabilities table in respect of privacy NP-23 NP‑040027 approved N1 N1-33 N1‑040405 agreed 2004‑02‑23 IMS-CCR -
0367 6 F Rel-5 5.7.0 5.8.0 Completion of major capabilities table in respect of privacy NP-23 NP‑040027 approved N1 N1-33 N1‑040405 agreed 2004‑02‑23 IMS-CCR -
0368 - F Rel-5 5.4.0 - User authentication failure cleanups - - - N1 N1-29 N1‑030445 revised 2003‑05‑17 IMS-CCR -
0368 1 F Rel-5 5.4.0 5.5.0 User authentication failure cleanups NP-20 NP‑030276 approved N1 N1-29 N1‑030506 agreed 2003‑05‑17 IMS-CCR -
0369 - F Rel-5 5.4.0 - S-CSCF behavior correction to enable call forwarding - - - N1 N1-29 N1‑030457 withdrawn 2003‑05‑17 IMS-CCR -
0369 1 - Rel-5 5.4.0 - S-CSCF behavior correction to enable call forwarding - - - N1 N1-30 N1‑030789 revised 2003‑05‑28 IMS-CCR -
0369 2 - Rel-5 5.4.0 - S-CSCF behavior correction to enable call forwarding - - - N1 N1-30 N1‑030856 revised 2003‑05‑28 IMS-CCR -
0369 3 F Rel-5 5.4.0 5.5.0 S-CSCF behavior correction to enable call forwarding NP-20 NP‑030277 approved N1 N1-30 N1‑030931 agreed 2003‑05‑28 IMS-CCR -
0370 - F Rel-5 5.4.0 - SUBSCRIBE request information stored at the P-CSCF and S-CSCF - - - N1 N1-29 N1‑030470 revised 2003‑05‑17 IMS-CCR -
0370 1 F Rel-5 5.4.0 5.5.0 SUBSCRIBE request information stored at the P-CSCF and S-CSCF NP-20 NP‑030277 approved N1 N1-30 N1‑030521 agreed 2003‑05‑28 IMS-CCR -
0371 - F Rel-5 5.4.0 - Profile Tables - Transparency - - - N1 N1-30 N1‑030592 revised 2003‑05‑28 IMS-CCR -
0371 1 F Rel-5 5.4.0 5.5.0 Profile Tables - Transparency NP-20 NP‑030277 approved N1 N1-30 N1‑030858 agreed 2003‑05‑28 IMS-CCR -
0372 - F Rel-5 5.4.0 - Profile Tables - Terminology - - - N1 N1-30 N1‑030593 withdrawn 2003‑05‑28 IMS-CCR -
0373 - F Rel-5 5.4.0 - Profile Tables - Restructure - - - N1 N1-30 N1‑030594 withdrawn 2003‑05‑28 IMS-CCR -
0374 - F Rel-5 5.4.0 - Profile Tables - Informative PDU Parameters - - - N1 N1-30 N1‑030595 withdrawn 2003‑05‑28 IMS-CCR -
0375 - F Rel-5 5.4.0 - Profile Tables - Major Capability Corrections - - - N1 N1-30 N1‑030596 revised 2003‑05‑28 IMS-CCR -
0375 1 F Rel-5 5.4.0 5.5.0 Profile Tables - Major Capability Corrections NP-20 NP‑030277 approved N1 N1-30 N1‑030860 agreed 2003‑05‑28 IMS-CCR -
0376 - F Rel-5 5.4.0 - Profile Tables - Deletion of Elements not used in 24.229 - - - N1 N1-30 N1‑030597 revised 2003‑05‑28 IMS-CCR -
0376 1 F Rel-5 5.4.0 - Profile Tables - Deletion of Elements not used in 24.229 - - - N1 N1-30 N1‑030894 revised 2003‑05‑28 IMS-CCR -
0376 2 F Rel-5 5.4.0 5.5.0 Profile Tables - Deletion of Elements not used in 24.229 NP-20 NP‑030277 approved N1 N1-30 N1‑030921 agreed 2003‑05‑28 IMS-CCR -
0377 - F Rel-5 5.4.0 - Use of the QoS parameter 'signalling information' for a signalling PDP context - - - N1 N1-30 N1‑030614 revised 2003‑05‑28 IMS-CCR -
0377 1 F Rel-5 5.4.0 5.5.0 Use of the QoS parameter 'signalling information' for a signalling PDP context NP-20 NP‑030277 approved N1 N1-30 N1‑030840 agreed 2003‑05‑28 IMS-CCR -
0378 - F Rel-5 5.4.0 - Deregistration of a PUID (not the last one) - - - N1 N1-30 N1‑030621 revised 2003‑05‑28 IMS-CCR -
0378 1 F Rel-5 5.4.0 - Deregistration of a PUID (not the last one) - - - N1 N1-30 N1‑030892 revised 2003‑05‑28 IMS-CCR -
0378 2 F Rel-5 5.4.0 5.5.0 Deregistration of a PUID (not the last one) NP-20 NP‑030277 approved N1 N1-30 N1‑030919 agreed 2003‑05‑28 IMS-CCR -
0379 - F Rel-5 5.4.0 - 'Last registered public user identity' terminology change - - - N1 N1-30 N1‑030622 revised 2003‑05‑28 IMS-CCR -
0379 1 F Rel-5 5.4.0 - 'Last registered public user identity' terminology change - - - N1 N1-30 N1‑030862 revised 2003‑05‑28 IMS-CCR -
0379 2 F Rel-5 5.4.0 5.5.0 'Last registered public user identity' terminology change NP-20 NP‑030277 approved N1 N1-30 N1‑030920 agreed 2003‑05‑28 IMS-CCR -
0380 - F Rel-5 5.4.0 - Check Integrity Protection for P-Access-Network-Info header - - - N1 N1-30 N1‑030635 revised 2003‑05‑28 IMS-CCR -
0380 1 F Rel-5 5.4.0 5.5.0 Check Integrity Protection for P-Access-Network-Info header NP-20 NP‑030277 approved N1 N1-30 N1‑030881 agreed 2003‑05‑28 IMS-CCR -
0381 - F Rel-5 5.4.0 - PCSCF setting of Integrity protection indicator and checking of Security Verify header - - - N1 N1-30 N1‑030636 revised 2003‑05‑28 IMS-CCR -
0381 1 F Rel-5 5.4.0 5.5.0 PCSCF setting of Integrity protection indicator and checking of Security Verify header NP-20 NP‑030278 approved N1 N1-30 N1‑030882 agreed 2003‑05‑28 IMS-CCR -
0382 - F Rel-5 5.4.0 - Security association handling at PCSCF - - - N1 N1-30 N1‑030637 rejected 2003‑05‑28 IMS-CCR -
0383 - F Rel-5 5.4.0 - Consistent treatment of register and de-register - - - N1 N1-30 N1‑030638 revised 2003‑05‑28 IMS-CCR -
0383 1 F Rel-5 5.4.0 5.5.0 Consistent treatment of register and de-register NP-20 NP‑030278 approved N1 N1-30 N1‑030884 agreed 2003‑05‑28 IMS-CCR -
0384 - F Rel-5 5.4.0 - Optionality of sending CK is removed - - - N1 N1-30 N1‑030639 revised 2003‑05‑28 IMS-CCR -
0384 1 F Rel-5 5.4.0 5.5.0 Optionality of sending CK is removed NP-20 NP‑030278 approved N1 N1-30 N1‑030885 agreed 2003‑05‑28 IMS-CCR -
0385 - F Rel-5 5.4.0 - Addition of note and Correction of References regarding security associations and registration - - - N1 N1-30 N1‑030640 revised 2003‑05‑28 IMS-CCR -
0385 1 F Rel-5 5.4.0 5.5.0 Addition of note and Correction of References regarding security associations and registration NP-20 NP‑030278 approved N1 N1-30 N1‑030886 agreed 2003‑05‑28 IMS-CCR -
0386 - F Rel-5 5.4.0 - Specify that all non-REGISTER requests must be integrity protected - - - N1 N1-30 N1‑030641 postponed 2003‑05‑28 IMS-CCR -
0387 - F Rel-5 5.4.0 - Subscription/Registration refresh time - - - N1 N1-30 N1‑030642 revised 2003‑05‑28 IMS-CCR -
0387 1 F Rel-5 5.4.0 5.5.0 Subscription/Registration refresh time NP-20 NP‑030278 approved N1 N1-30 N1‑030887 agreed 2003‑05‑28 IMS-CCR -
0388 - F Rel-5 5.4.0 - Corrections to use of IK - - - N1 N1-30 N1‑030643 revised 2003‑05‑28 IMS-CCR -
0388 1 F Rel-5 5.4.0 5.5.0 Corrections to use of IK NP-20 NP‑030278 approved N1 N1-30 N1‑030863 agreed 2003‑05‑28 IMS-CCR -
0389 - F Rel-5 5.4.0 - Corrections to use of RES/XRES - - - N1 N1-30 N1‑030644 revised 2003‑05‑28 IMS-CCR -
0389 1 F Rel-5 5.4.0 - Corrections to use of RES/XRES - - - N1 N1-30 N1‑030864 withdrawn 2003‑05‑28 IMS-CCR -
0390 - F Rel-5 5.4.0 5.5.0 Mobile-originating case at UE NP-20 NP‑030278 approved N1 N1-30 N1‑030647 agreed 2003‑05‑28 IMS-CCR -
0391 - F Rel-5 5.4.0 - P-CSCF handling of the Record-Route header in MO requests - - - N1 N1-30 N1‑030648 rejected 2003‑05‑28 IMS-CCR -
0392 - F Rel-5 5.4.0 - P-CSCF handling of Route header in MO requests - - - N1 N1-30 N1‑030649 rejected 2003‑05‑28 IMS-CCR -
0393 - F Rel-5 5.4.0 - P-CSCF handling of the Record-Route header in requests terminated at the UE - - - N1 N1-30 N1‑030650 rejected 2003‑05‑28 IMS-CCR -
0394 - F Rel-5 5.4.0 - Re-authentication procedure. - - - N1 N1-30 N1‑030651 revised 2003‑05‑28 IMS-CCR -
0394 1 F Rel-5 5.4.0 - Re-authentication procedure. - - - N1 N1-30 N1‑030883 revised 2003‑05‑28 IMS-CCR -
0394 2 F Rel-5 5.4.0 5.5.0 Re-authentication procedure. NP-20 NP‑030278 approved N1 N1-30 N1‑030917 agreed 2003‑05‑28 IMS-CCR -
0395 - F Rel-5 5.4.0 5.5.0 Replacement of SIP URL with SIP URI NP-20 NP‑030278 approved N1 N1-30 N1‑030652 agreed 2003‑05‑28 IMS-CCR -
0396 - F Rel-5 5.4.0 - Via header in registration and re-registration. - - - N1 N1-30 N1‑030653 withdrawn 2003‑05‑28 IMS-CCR -
0397 - F Rel-5 5.4.0 - Notification about registration state - - - N1 N1-30 N1‑030654 revised 2003‑05‑28 IMS-CCR -
0397 1 F Rel-5 5.4.0 - Notification about registration state - - - N1 N1-30 N1‑030889 revised 2003‑05‑28 IMS-CCR -
0397 2 F Rel-5 5.4.0 5.5.0 Notification about registration state NP-20 NP‑030279 approved N1 N1-30 N1‑030926 agreed 2003‑05‑28 IMS-CCR -
0398 - F Rel-5 5.4.0 - Combined CRs: N1-030495, N1-030558 , and N1-030559 NP-20 NP‑030279 rejected N1 N1-30 N1‑030646 agreed 2003‑05‑28 IMS-CCR -
0398 - F Rel-5 5.4.0 - Combined CRs: N1-030495 (Lucent), N1-030558 (Nokia), and N1-030559(Nokia) NP-20 NP‑030291 rejected Nokia, Luc - N1‑030646 - 2003‑05‑12 IMS-CCR - 2003‑06‑06
0398 - F Rel-5 5.4.0 - Combined CRs: N1-030495 (Lucent), N1-030558 (Nokia), and N1-030559(Nokia) NP-20 SP‑030259 revised Nokia, Luc - N1‑030646 - 2003‑05‑12 IMS-CCR - 2003‑06‑06
0399 - F Rel-5 5.4.0 - Clarifications on general purpose PDP context - - - N1 N1-30 N1‑030693 rejected 2003‑05‑28 IMS-CCR -
0400 - F Rel-5 5.4.0 - The principles of the usage of SIP/SDP - - - N1 N1-30 N1‑030695 rejected 2003‑05‑28 IMS-CCR -
0401 - F Rel-5 5.4.0 - Clarifications on AS provided by the third party service providers - - - N1 N1-30 N1‑030696 revised 2003‑05‑28 IMS-CCR -
0401 1 F Rel-5 5.4.0 - Clarifications on AS provided by the third party service providers - - - N1 N1-30 N1‑030867 - 2003‑05‑28 IMS-CCR -
0402 - F Rel-5 5.4.0 - Handling of P-Asserted ID in MGCF - - - N1 N1-30 N1‑030697 revised 2003‑05‑28 IMS-CCR -
0402 1 F Rel-5 5.4.0 5.5.0 Handling of P-Asserted ID in MGCF NP-20 NP‑030279 approved N1 N1-30 N1‑030848 agreed 2003‑05‑28 IMS-CCR -
0403 - F Rel-5 5.4.0 - Handling of P-Asserted ID in P-CSCF for terminating call - - - N1 N1-30 N1‑030698 rejected 2003‑05‑28 IMS-CCR -
0404 - F Rel-5 5.4.0 - S-CSCF initiated release of calls to circiut switched network - - - N1 N1-30 N1‑030699 revised 2003‑05‑28 IMS-CCR -
0404 1 F Rel-5 5.4.0 5.5.0 S-CSCF initiated release of calls to circiut switched network NP-20 NP‑030279 approved N1 N1-30 N1‑030873 agreed 2003‑05‑28 IMS-CCR -
0405 - F Rel-5 5.4.0 - Supported Integrity algorithms - - - N1 N1-30 N1‑030702 revised 2003‑05‑28 IMS-CCR -
0405 1 F Rel-5 5.4.0 - Supported Integrity algorithms - - - N1 N1-30 N1‑030890 revised 2003‑05‑28 IMS-CCR -
0405 2 F Rel-5 5.4.0 5.5.0 Supported Integrity algorithms NP-20 NP‑030279 approved N1 N1-30 N1‑030927 agreed 2003‑05‑28 IMS-CCR -
0406 - F Rel-5 5.4.0 - Clean up of the use of the CK - - - N1 N1-30 N1‑030703 revised 2003‑05‑28 IMS-CCR -
0406 1 F Rel-5 5.4.0 - Clean up of the use of the CK - - - N1 N1-30 N1‑030893 withdrawn 2003‑05‑28 IMS-CCR -
0407 - F Rel-5 5.4.0 - RFC 3524, Single Reservation Flows - - - N1 N1-30 N1‑030705 revised 2003‑05‑28 IMS-CCR -
0407 1 F Rel-5 5.4.0 5.5.0 RFC 3524, Single Reservation Flows NP-20 NP‑030279 approved N1 N1-30 N1‑030851 agreed 2003‑05‑28 IMS-CCR -
0408 - F Rel-5 5.4.0 - 488 Responses apply only to requests - - - N1 N1-30 N1‑030706 withdrawn 2003‑05‑28 IMS-CCR -
0409 - F Rel-5 5.4.0 - Cancellation of dialogs - - - N1 N1-30 N1‑030707 revised 2003‑05‑28 IMS-CCR -
0409 1 F Rel-5 5.4.0 - Cancellation of dialogs - - - N1 N1-30 N1‑030874 revised 2003‑05‑28 IMS-CCR -
0409 2 F Rel-5 5.4.0 - Cancellation of dialogs - - - N1 N1-30 N1‑030922 rejected 2003‑05‑28 IMS-CCR -
0410 - F Rel-5 5.4.0 - Clarification of the S-CSCF's handling of the P-access-network-info header - - - N1 N1-30 N1‑030708 revised 2003‑05‑28 IMS-CCR -
0410 1 F Rel-5 5.4.0 5.5.0 Clarification of the S-CSCF's handling of the P-access-network-info header NP-20 NP‑030279 approved N1 N1-30 N1‑030868 agreed 2003‑05‑28 IMS-CCR -
0411 - F Rel-5 5.4.0 - Port numbers in the RR header entries - - - N1 N1-30 N1‑030716 revised 2003‑05‑28 IMS-CCR -
0411 1 F Rel-5 5.4.0 - Port numbers in the RR header entries - - - N1 N1-30 N1‑030849 revised 2003‑05‑28 IMS-CCR -
0411 2 F Rel-5 5.4.0 5.5.0 Port numbers in the RR header entries NP-20 NP‑030279 approved N1 N1-30 N1‑030941 agreed 2003‑05‑28 IMS-CCR -
0412 - F Rel-5 5.4.0 - Registration abnormal cases - - - N1 N1-30 N1‑030717 revised 2003‑05‑28 IMS-CCR -
0412 1 F Rel-5 5.4.0 - Registration abnormal cases - - - N1 N1-30 N1‑030843 revised 2003‑05‑28 IMS-CCR -
0412 2 F Rel-5 5.4.0 5.5.0 Registration abnormal cases NP-20 NP‑030279 approved N1 N1-30 N1‑030928 agreed 2003‑05‑28 IMS-CCR -
0413 - F Rel-5 5.4.0 - AS procedures - - - N1 N1-30 N1‑030718 revised 2003‑05‑28 IMS-CCR -
0413 1 F Rel-5 5.4.0 - AS procedures - - - N1 N1-30 N1‑030869 withdrawn 2003‑05‑28 IMS-CCR -
0414 - F Rel-5 5.4.0 - Corrections to 5.4.3.3 - - - N1 N1-30 N1‑030719 revised 2003‑05‑28 IMS-CCR -
0414 1 F Rel-5 5.4.0 - Corrections to 5.4.3.3 - - - N1 N1-30 N1‑030853 revised 2003‑05‑28 IMS-CCR -
0414 2 F Rel-5 5.4.0 - Corrections to 5.4.3.3 - - - N1 N1-30 N1‑030930 withdrawn 2003‑05‑28 IMS-CCR -
0415 - F Rel-5 5.4.0 5.5.0 Minor correction to section 5.4.5.1.2 NP-20 NP‑030280 approved N1 N1-30 N1‑030720 agreed 2003‑05‑28 IMS-CCR -
0416 - F Rel-6 5.4.0 - Forking in IMS - - - N1 N1-30 N1‑030721 postponed 2003‑05‑28 IMS-CCR -
0417 - F Rel-5 5.4.0 - Introduction of RTCP bandwidth - - - N1 N1-30 N1‑030722 revised 2003‑05‑28 IMS-CCR -
0417 1 F Rel-5 5.4.0 5.5.0 Introduction of RTCP bandwidth NP-20 NP‑030280 approved N1 N1-30 N1‑030872 agreed 2003‑05‑28 IMS-CCR -
0418 - F Rel-5 5.4.0 - Registratin Event - Shortend - - - N1 N1-30 N1‑030730 revised 2003‑05‑28 IMS-CCRE -
0418 1 F Rel-5 5.4.0 5.5.0 Registratin Event - Shortend NP-20 NP‑030280 approved N1 N1-30 N1‑030844 agreed 2003‑05‑28 IMS-CCR -
0419 - F Rel-5 5.4.0 - HSS / S-CSCF text relating to user deregistration - - - N1 N1-30 N1‑030739 revised 2003‑05‑28 IMS-CCR -
0419 1 F Rel-5 5.4.0 5.5.0 HSS / S-CSCF text relating to user deregistration NP-20 NP‑030280 approved N1 N1-30 N1‑030845 agreed 2003‑05‑28 IMS-CCR -
0420 - F Rel-5 5.4.0 - Privacy considerations for the UE - - - N1 N1-30 N1‑030742 postponed 2003‑05‑28 IMS-CCR -
0420 1 - Rel-5 5.5.0 - Privacy considerations for the UE - - - N1 N1-31 N1‑031159 - 2003‑09‑12 IMS-CCR -
0420 2 F Rel-5 5.6.0 - Privacy considerations for the UE - - - N1 N1-32 N1‑031350 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0421 - F Rel-5 5.4.0 5.5.0 Handling of unknown methods at the P-CSCF NP-20 NP‑030280 approved N1 N1-30 N1‑030743 agreed 2003‑05‑28 IMS-CCR -
0422 - F Rel-5 5.4.0 - Definitions and abbreviations update - - - N1 N1-30 N1‑030751 revised 2003‑05‑28 IMS-CCR -
0422 1 F Rel-5 5.4.0 5.5.0 Definitions and abbreviations update NP-20 NP‑030280 approved N1 N1-30 N1‑030870 agreed 2003‑05‑28 IMS-CCR -
0423 - F Rel-5 5.4.0 5.5.0 Removal of hanging paragraph NP-20 NP‑030280 approved N1 N1-30 N1‑030752 agreed 2003‑05‑28 IMS-CCR -
0424 - F Rel-5 5.4.0 5.5.0 Access network charging information NP-20 NP‑030280 approved N1 N1-30 N1‑030753 agreed 2003‑05‑28 IMS-CCR -
0425 - F Rel-5 5.4.0 - UE procedure tidyup - - - N1 N1-30 N1‑030754 revised 2003‑05‑28 IMS-CCR -
0425 1 F Rel-5 5.4.0 5.5.0 UE procedure tidyup NP-20 NP‑030280 approved N1 N1-30 N1‑030871 agreed 2003‑05‑28 IMS-CCR -
0426 - F Rel-5 5.4.0 5.5.0 P-CSCF procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030755 agreed 2003‑05‑28 IMS-CCR -
0427 - F Rel-5 5.4.0 5.5.0 I-CSCF procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030756 agreed 2003‑05‑28 IMS-CCR -
0428 - F Rel-5 5.4.0 5.5.0 S-CSCF procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030757 agreed 2003‑05‑28 IMS-CCR -
0429 - F Rel-5 5.4.0 5.5.0 BGCF procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030758 agreed 2003‑05‑28 IMS-CCR -
0430 - F Rel-5 5.4.0 5.5.0 AS procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030759 agreed 2003‑05‑28 IMS-CCR -
0431 - F Rel-5 5.4.0 5.5.0 MRFC procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030760 agreed 2003‑05‑28 IMS-CCR -
0432 - F Rel-5 5.4.0 - Charging references in 4.1 - - - N1 N1-30 N1‑030768 - 2003‑05‑28 IMS-CCR -
0432 1 - Rel-5 5.5.0 - Charging references in 4.1 - - - N1 N1-31 N1‑031164 - 2003‑09‑12 IMS-CCR -
0432 2 F Rel-5 5.6.0 - Charging references in 4.1 - - - N1 N1-32 N1‑031352 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0433 - F Rel-5 5.4.0 - MGCF procedure tidyup - - - N1 N1-30 N1‑030769 - 2003‑05‑28 IMS-CCR -
0433 1 - Rel-5 5.5.0 - MGCF procedure tidyup - - - N1 N1-31 N1‑031166 - 2003‑09‑12 IMS-CCR -
0433 2 F Rel-5 5.6.0 - MGCF procedure tidyup - - - N1 N1-32 N1‑031356 withdrawn 2003‑11‑03 IMS-CCR - 2004‑01‑05
0434 - F Rel-5 5.4.0 - SDP procedure tidyup - - - N1 N1-30 N1‑030770 revised 2003‑05‑28 IMS-CCR -
0434 1 F Rel-5 5.4.0 5.5.0 SDP procedure tidyup NP-20 NP‑030281 approved N1 N1-30 N1‑030852 agreed 2003‑05‑28 IMS-CCR -
0435 - F Rel-5 5.4.0 - Compression procedure tidyup - - - N1 N1-30 N1‑030771 - 2003‑05‑28 IMS-CCR -
0435 1 - Rel-5 5.5.0 - Compression procedure tidyup - - - N1 N1-31 N1‑031165 - 2003‑09‑12 IMS-CCR -
0435 2 F Rel-5 5.6.0 - Compression procedure tidyup - - - N1 N1-32 N1‑031354 withdrawn 2003‑11‑03 IMS-CCR - 2004‑01‑05
0436 - F Rel-5 5.4.0 - Reference updates - - - N1 N1-30 N1‑030772 withdrawn 2003‑05‑28 IMS-CCR -
0437 F Rel-5 5.4.0 - Clarifications on AS procedure on REGISTER request - - - N1 N1-30 N1‑030776 rejected 2003‑05‑28 IMS-CCR -
0438 - - Rel-5 5.4.0 - Profile Tables – Further Corrections - - - N1 N1-30 N1‑030603 revised 2003‑05‑28 IMS-CCRE -
0438 1 - Rel-5 5.4.0 - Profile Tables – Further Corrections - - - N1 N1-30 N1‑030861 revised 2003‑05‑28 IMS-CCRE -
0438 2 F Rel-5 5.4.0 5.5.0 Profile Tables – Further Corrections NP-20 NP‑030281 approved N1 N1-30 N1‑030935 agreed 2003‑05‑28 IMS-CCR -
0439 - - Rel-5 5.4.0 - AS's subscription for the registration state event package - - - N1 N1-30 N1‑030787 revised 2003‑05‑28 IMS-CCR -
0439 1 F Rel-5 5.4.0 - AS's subscription for the registration state event package - - - N1 N1-30 N1‑030846 revised 2003‑05‑28 IMS-CCR -
0439 2 F Rel-5 5.4.0 - AS's subscription for the registration state event package - - - N1 N1-30 N1‑030929 revised 2003‑05‑28 IMS-CCR -
0439 3 F Rel-5 5.4.0 5.5.0 AS's subscription for the registration state event package NP-20 NP‑030281 approved N1 N1-30 N1‑030940 agreed 2003‑05‑28 IMS-CCR -
0440 - F Rel-5 5.4.0 5.5.0 Temporary Public User Identity in re- and de-REGISTER requests NP-20 NP‑030281 approved N1 N1-30 N1‑030792 agreed 2003‑05‑28 IMS-CCR -
0441 - - Rel-6 5.4.0 - Record-Routing of SIP dialogs in S-CSCF - - - N1 N1-30 N1‑030800 postponed 2003‑05‑28 PRESNC -
0441 1 B Rel-6 5.5.0 - Record-Routing of SIP dialogs in S-CSCF - - - N1 N1-31 N1‑031143 - 2003‑09‑12 PRESNC -
0442 - F Rel-5 5.5.0 - Correction to description or RES/XTRES usage - - - N1 N1-31 N1‑030981 rejected 2003‑09‑12 IMS-CCR -
0443 - F Rel-5 5.5.0 - SA lifetimes corrections (alignment with 33.203) - - - N1 N1-31 N1‑030982 rejected 2003‑09‑12 IMS-CCR -
0444 - F Rel-5 5.5.0 - All non-REGISTER requests must be integrity protected - - - N1 N1-31 N1‑030984 revised 2003‑09‑12 IMS-CCR -
0444 1 F Rel-5 5.5.0 - All non-REGISTER requests must be integrity protected - - - N1 N1-31 N1‑031236 revised 2003‑09‑12 IMS-CCR -
0444 2 F Rel-5 5.5.0 5.6.0 All non-REGISTER requests must be integrity protected NP-21 NP‑030412 approved N1 N1-31 N1‑031328 agreed 2003‑09‑12 IMS-CCR -
0445 - F Rel-5 5.5.0 5.6.0 Download of all service profiles linked to PUID being registered and implicitly registered NP-21 NP‑030412 approved N1 N1-31 N1‑031010 agreed 2003‑09‑12 IMS-CCR -
0446 - F Rel-5 5.5.0 - Update Handling of Security Association - - - N1 N1-31 N1‑031015 revised 2003‑09‑12 IMS-CCR -
0446 1 F Rel-5 5.5.0 - Update Handling of Security Association - - - N1 N1-31 N1‑031261 revised 2003‑09‑12 IMS-CCR -
0446 2 F Rel-5 5.5.0 - Update Handling of Security Association - - - N1 N1-31 N1‑031284 withdrawn 2003‑09‑12 IMS-CCR -
0447 - F Rel-5 5.5.0 - Security-Client header in REGISTER request - - - N1 N1-31 N1‑031022 revised 2003‑09‑12 IMS-CCR -
0447 1 F Rel-5 5.5.0 - Security-Client header in REGISTER request - - - N1 N1-31 N1‑031240 rejected 2003‑09‑12 IMS-CCR -
0448 - F Rel-5 5.5.0 - Authentication at UE - - - N1 N1-31 N1‑031023 revised 2003‑09‑12 IMS-CCR -
0448 1 F Rel-5 5.5.0 - Authentication at UE - - - N1 N1-31 N1‑031241 revised 2003‑09‑12 IMS-CCR -
0448 2 F Rel-5 5.5.0 - Authentication at UE - - - N1 N1-31 N1‑031249 revised 2003‑09‑12 IMS-CCR -
0448 3 F Rel-5 5.5.0 5.6.0 Authentication at UE NP-21 NP‑030412 approved N1 N1-31 N1‑031326 agreed 2003‑09‑12 IMS-CCR -
0449 - F Rel-5 5.5.0 - Nework authentication failure at the UE - - - N1 N1-31 N1‑031024 revised 2003‑09‑12 IMS-CCR -
0449 1 F Rel-5 5.5.0 5.6.0 Nework authentication failure at the UE NP-21 NP‑030412 approved N1 N1-31 N1‑031242 agreed 2003‑09‑12 IMS-CCR -
0450 - F Rel-5 5.5.0 - Authentication failure at the UE - - - N1 N1-31 N1‑031025 revised 2003‑09‑12 IMS-CCR -
0450 1 F Rel-5 5.5.0 - Authentication failure at the UE - - - N1 N1-31 N1‑031275 - 2003‑09‑12 IMS-CCR -
0451 - F Rel-5 5.5.0 - Usage of the SA at the P-CSCF - - - N1 N1-31 N1‑031026 revised 2003‑09‑12 IMS-CCR -
0451 1 F Rel-5 5.5.0 - Usage of the SA at the P-CSCF - - - N1 N1-31 N1‑031243 revised 2003‑09‑12 IMS-CCR -
0451 2 F Rel-5 5.5.0 - Usage of the SA at the P-CSCF - - - N1 N1-31 N1‑031273 revised 2003‑09‑12 IMS-CCR -
0451 3 F Rel-5 5.5.0 5.6.0 Handling of security association NP-21 NP‑030412 approved N1 N1-31 N1‑031327 agreed 2003‑09‑12 IMS-CCR -
0452 - F Rel-5 5.5.0 - Re-authentication timer at S-CSCF - - - N1 N1-31 N1‑031027 revised 2003‑09‑12 IMS-CCR -
0452 1 F Rel-5 5.5.0 5.6.0 Re-authentication timer at S-CSCF NP-21 NP‑030412 approved N1 N1-31 N1‑031274 agreed 2003‑09‑12 IMS-CCR -
0453 - F Rel-5 5.5.0 - The reg-await-auth timer expiration - - - N1 N1-31 N1‑031028 rejected 2003‑09‑12 IMS-CCR -
0454 - F Rel-5 5.5.0 - Setting the SA lifetime at UE during registration - - - N1 N1-31 N1‑031029 rejected 2003‑09‑12 IMS-CCR -
0455 - F Rel-5 5.5.0 - Authentication failure at S-CSCF - - - N1 N1-31 N1‑031030 revised 2003‑09‑12 IMS-CCR -
0455 1 F Rel-5 5.5.0 - Authentication failure at S-CSCF - - - N1 N1-31 N1‑031244 revised 2003‑09‑12 IMS-CCR -
0455 2 F Rel-5 5.5.0 5.6.0 Authentication failure at S-CSCF NP-21 NP‑030412 approved N1 N1-31 N1‑031285 agreed 2003‑09‑12 IMS-CCR -
0456 - F Rel-5 5.5.0 - Subscription termination sent by the S-CSCF - - - N1 N1-31 N1‑031031 revised 2003‑09‑12 IMS-CCR -
0456 1 F Rel-5 5.5.0 - Subscription termination sent by the S-CSCF - - - N1 N1-31 N1‑031231 revised 2003‑09‑12 IMS-CCR -
0456 2 F Rel-5 5.5.0 5.6.0 Subscription termination sent by the S-CSCF NP-21 NP‑030413 approved N1 N1-31 N1‑031276 agreed 2003‑09‑12 IMS-CCR -
0457 - F Rel-5 5.5.0 5.6.0 Subscription termination at the P-CSCF NP-21 NP‑030413 approved N1 N1-31 N1‑031032 agreed 2003‑09‑12 IMS-CCR -
0458 - F Rel-5 5.5.0 5.6.0 Network -initiated deregistration at P-CSCF NP-21 NP‑030413 approved N1 N1-31 N1‑031033 agreed 2003‑09‑12 IMS-CCR -
0459 - F Rel-5 5.5.0 - Notification about registration status at AS - - - N1 N1-31 N1‑031034 revised 2003‑09‑12 IMS-CCR -
0459 1 F Rel-5 5.5.0 5.6.0 Notification about registration status at AS NP-21 NP‑030349 approved N1 N1-31 N1‑031232r agreed 2003‑09‑12 IMS-CCR - 2003‑09‑17
0459 1 F Rel-5 5.5.0 - Notification about registration status at AS NP-21 NP‑030415 revised N1 N1-31 N1‑031232 agreed 2003‑09‑12 IMS-CCR -> NP-030349
0460 - F Rel-5 5.5.0 - Use of the P-CSCF's default port - - - N1 N1-31 N1‑031035 rejected 2003‑09‑12 IMS-CCR -
0461 - F Rel-5 5.5.0 - Service profile - - - N1 N1-31 N1‑031036 revised 2003‑09‑12 IMS-CCR -
0461 1 F Rel-5 5.5.0 5.6.0 Service profile NP-21 NP‑030413 approved N1 N1-31 N1‑031233 agreed 2003‑09‑12 IMS-CCR -
0462 - F Rel-5 5.5.0 - c= parameter in SDP - - - N1 N1-31 N1‑031037 rejected 2003‑09‑12 IMS-CCR -
0463 - F Rel-5 5.5.0 - References update - - - N1 N1-31 N1‑031038 rejected 2003‑09‑12 IMS-CCR -
0464 - F Rel-5 5.5.0 - Corrections on ICID for REGISTER - - - N1 N1-31 N1‑031045 revised 2003‑09‑12 IMS-CCR -
0464 1 F Rel-5 5.5.0 - Corrections on ICID for REGISTER - - - N1 N1-31 N1‑031234 postponed 2003‑09‑12 IMS-CCR -
0465 - F Rel-6 5.5.0 - Alignment with TS for policy control over Gq interface - - - N1 N1-31 N1‑031047 revised 2003‑09‑12 IMS2 -
0465 1 F Rel-6 5.5.0 6.0.0 Alignment with TS for policy control over Gq interface NP-21 NP‑030418 approved N1 N1-31 N1‑031267 agreed 2003‑09‑12 IMS2 -
0466 - F Rel-5 5.5.0 - Requirements on Preconditions - - - N1 N1-31 N1‑031069 revised 2003‑09‑12 IMS-CCR -
0466 1 F Rel-5 5.5.0 5.6.0 Requirements on Preconditions NP-21 NP‑030413 approved N1 N1-31 N1‑031246 agreed 2003‑09‑12 IMS-CCR -
0467 - F Rel-5 5.5.0 - Call forwarding cleanup - - - N1 N1-31 N1‑031093 revised 2003‑09‑12 IMS-CCR -
0467 1 F Rel-5 5.5.0 5.6.0 Call forwarding cleanup NP-21 NP‑030413 approved N1 N1-31 N1‑031238 agreed 2003‑09‑12 IMS-CCR -
0468 - F Rel-5 5.5.0 5.6.0 Update of references NP-21 NP‑030413 approved N1 N1-31 N1‑031094 agreed 2003‑09‑12 IMS-CCR -
0469 - F Rel-5 5.5.0 - ID privacy handling - - - N1 N1-31 N1‑031106 postponed 2003‑09‑12 IMS-CCR -
0470 - F Rel-5 5.5.0 - Adding P-Asserted-Identity headers to NE initiated subscriptions - - - N1 N1-31 N1‑031107 revised 2003‑09‑12 IMS-CCR -
0470 1 F Rel-5 5.5.0 5.6.0 Adding P-Asserted-Identity headers to NE initiated subscriptions NP-21 NP‑030414 approved N1 N1-31 N1‑031314 agreed 2003‑09‑12 IMS-CCR -
0471 - F Rel-5 5.5.0 - Usage of preconditions - - - N1 N1-31 N1‑031108 postponed 2003‑09‑12 IMS-CCR -
0472 - B Rel-6 5.5.0 - I-CSCF procedures for openness - - - N1 N1-31 N1‑031109 revised 2003‑09‑12 IMS-CCR -
0472 1 B Rel-6 5.5.0 6.0.0 I-CSCF procedures for openness NP-21 NP‑030418 approved N1 N1-31 N1‑031304 agreed 2003‑09‑12 IMS2 -
0473 - B Rel-6 5.5.0 - Registration from multiple terminals and forking - - - N1 N1-31 N1‑031110 revised 2003‑09‑12 IMS-CCR -
0473 1 B Rel-6 5.5.0 - Registration from multiple terminals and forking NP-21 NP‑030418 revised N1 N1-31 N1‑031300 agreed 2003‑09‑12 IMS2 -
0473 2 B Rel-6 5.5.0 - Registration from multiple terminals and forking NP-21 NP‑030428 withdrawn Nokia - NP‑030433 - 2003‑09‑12 IMS2 - 2003‑09‑17
0473 3 B Rel-6 5.5.0 6.0.0 Registration from multiple terminals and forking NP-21 NP‑030433 approved Nokia - NP‑030433 - 2003‑09‑12 IMS2 - 2003‑09‑17
0474 - F Rel-5 5.5.0 - Record Routing requirements for the S-CSCF - - - N1 N1-31 N1‑031111 rejected 2003‑09‑12 IMS-CCR -
0475 - F Rel-5 5.5.0 - AS originated requests - - - N1 N1-31 N1‑031112 rejected 2003‑09‑12 IMS-CCR -
0476 - F Rel-5 5.5.0 - UE behaviour on reception of 420 (Bad Extension) message - - - N1 N1-31 N1‑031113 revised 2003‑09‑12 IMS-CCR -
0476 1 F Rel-5 5.5.0 - UE behaviour on reception of 420 (Bad Extension) message - - - N1 N1-31 N1‑031239 postponed 2003‑09‑12 IMS-CCR -
0477 - F Rel-5 5.5.0 - Discrepancy between 24.229 and RFC3455 regarding P-Charging-Vector header - - - N1 N1-31 N1‑031114 rejected 2003‑09‑12 IMS-CCR -
0478 - F Rel-5 5.5.0 - Corrections on AS provided by the third party service providers - - - N1 N1-31 N1‑031115 rejected 2003‑09‑12 IMS-CCR -
0479 - F Rel-5 5.5.0 - Replace USIM by ISIM for user identity storage - - - N1 N1-31 N1‑031116 revised 2003‑09‑12 IMS-CCR -
0479 1 F Rel-5 5.5.0 5.6.0 Replace USIM by ISIM for user identity storage NP-21 NP‑030414 approved N1 N1-31 N1‑031247 agreed 2003‑09‑12 IMS-CCR -
0480 - B Rel-6 5.5.0 - Access Independent IMS - - - N1 N1-31 N1‑031118 revised 2003‑09‑12 IMSCOOP -
0480 1 B Rel-6 5.5.0 - Access Independent IMS - - - N1 N1-31 N1‑031245 revised 2003‑09‑12 IMSCOOP -
0480 2 B Rel-6 5.5.0 - Access Independent IMS - - - N1 N1-31 N1‑031303 revised 2003‑09‑12 IMSCOOP -
0480 3 B Rel-6 5.5.0 6.0.0 Access Independent IMS NP-21 NP‑030419 approved N1 N1-31 N1‑031333 agreed 2003‑09‑12 IMSCOOP -
0481 - F Rel-5 5.5.0 - 24.229 R5 CR: Corrections to Profile Tables - - - N1 N1-31 N1‑031139 revised 2003‑09‑12 IMS-CCR -
0481 1 F Rel-5 5.5.0 5.6.0 24.229 R5 CR: Corrections to Profile Tables NP-21 NP‑030414 approved N1 N1-31 N1‑031248 agreed 2003‑09‑12 IMS-CCR -
0482 - F Rel-5 5.5.0 5.6.0 24.229 R5 CR: Setting of SUBSCRIBE exipiration time NP-21 NP‑030414 approved N1 N1-31 N1‑031140 agreed 2003‑09‑12 IMS-CCR -
0483 - F Rel-5 5.5.0 - 24.229 R5 CR: Alignment of IMS Compression with RFC 3486 - - - N1 N1-31 N1‑031171 revised 2003‑09‑12 IMS-CCR -
0483 1 F Rel-5 5.5.0 - 24.229 R5 CR: Alignment of IMS Compression with RFC 3486 - - - N1 N1-31 N1‑031235 revised 2003‑09‑12 IMS-CCR -
0483 2 F Rel-5 5.5.0 - 24.229 R5 CR: Alignment of IMS Compression with RFC 3486 - - - N1 N1-31 N1‑031329 revised 2003‑09‑12 IMS-CCR -
0483 3 F Rel-5 5.5.0 5.6.0 24.229 R5 CR: Alignment of IMS Compression with RFC 3486 NP-21 NP‑030414 approved N1 N1-31 N1‑031335 agreed 2003‑09‑12 IMS-CCR -
0484 - - Rel-5 5.5.0 - Registration amendments in profile - - - N1 N1-31 N1‑031175 - 2003‑09‑12 IMS-CCR -
0484 1 F Rel-5 5.6.0 - Registration amendments in profile - - - N1 N1-32 N1‑031345 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0485 - F Rel-5 5.5.0 - INVITE dialog amendments in profile - - - N1 N1-31 N1‑031170 - 2003‑09‑12 IMS-CCR -
0485 1 F Rel-5 5.6.0 5.7.0 INVITE dialog amendments in profile NP-22 NP‑030476 approved N1 N1-32 N1‑031358 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0486 - F Rel-6 5.5.0 - 24.229 R6 CR: NACK mechanism for Signalling Compression - - - N1 N1-31 N1‑031302 postponed 2003‑09‑12 IMS-CCR -
0487 - A Rel-6 6.0.0 - Registration amendments in profile - - - N1 N1-32 N1‑031346 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0487 1 F Rel-6 6.0.0 6.1.0 Registration amendments in profile NP-22 NP‑030482 approved N1 N1-32 N1‑031627 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0488 - A Rel-6 6.0.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-32 N1‑031349 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0488 1 C Rel-6 6.0.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-32 N1‑031629 - 2003‑11‑03 IMS-CCR - 2004‑01‑05
0488 2 A Rel-6 6.1.0 - Completion of major capabilities table in respect of privacy - - - N1 N1-33 N1‑040313 revised 2004‑02‑23 IMS-CCR -
0488 3 A Rel-6 6.1.0 6.2.0 Completion of major capabilities table in respect of privacy NP-23 NP‑040027 approved N1 N1-33 N1‑040406 agreed 2004‑02‑23 IMS-CCR -
0488 3 A Rel-6 6.1.0 6.2.0 Completion of major capabilities table in respect of privacy NP-23 NP‑040027 approved N1 N1-33 N1‑040406 agreed 2004‑02‑23 IMS-CCR -
0489 - F Rel-6 6.0.0 6.1.0 Privacy considerations for the UE NP-22 NP‑030482 approved N1 N1-32 N1‑031351 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0490 - A Rel-6 6.0.0 - Charging references in 4.1 - - - N1 N1-32 N1‑031353 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0491 - A Rel-6 6.0.0 - Compression procedure tidyup - - - N1 N1-32 N1‑031355 withdrawn 2003‑11‑03 IMS-CCR - 2004‑01‑05
0492 - A Rel-6 6.0.0 - MGCF procedure tidyup - - - N1 N1-32 N1‑031357 withdrawn 2003‑11‑03 IMS-CCR - 2004‑01‑05
0493 - A Rel-6 6.0.0 6.1.0 INVITE dialog amendments in profile NP-22 NP‑030476 approved N1 N1-32 N1‑031359 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0494 - F Rel-6 6.0.0 6.1.0 Correction of I-CSCF handling of multiple private user identities with same public user identity NP-22 NP‑030482 approved N1 N1-32 N1‑031375 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0495 - F Rel-5 5.6.0 - P-Asserted-Identity in SUBSCRIBE requests - - - N1 N1-32 N1‑031376 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0495 1 F Rel-5 5.6.0 5.7.0 P-Asserted-Identity in SUBSCRIBE requests NP-22 NP‑030476 approved N1 N1-32 N1‑031631 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0496 - A Rel-6 6.0.0 - P-Asserted-Identity in SUBSCRIBE requests - - - N1 N1-32 N1‑031377 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0496 1 A Rel-6 6.0.0 6.1.0 P-Asserted-Identity in SUBSCRIBE requests NP-22 NP‑030476 approved N1 N1-32 N1‑031632 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0497 - F Rel-6 6.0.0 6.1.0 Addition of reference to Gq interface NP-22 NP‑030482 approved N1 N1-32 N1‑031378 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0498 - F Rel-5 5.6.0 - P-CSCF integrity protection - - - N1 N1-32 N1‑031379 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0498 1 F Rel-5 5.6.0 - P-CSCF integrity protection - - - N1 N1-32 N1‑031633 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0498 2 F Rel-5 5.6.0 - P-CSCF integrity protection - - - N1 N1-32 N1‑031717 withdrawn 2003‑11‑03 IMS-CCR - 2004‑01‑05
0498 3 F Rel-5 5.7.0 - P-CSCF integrity protection - - - N1 N1-33 N1‑040314 revised 2004‑02‑23 IMS-CCR -
0498 4 F Rel-5 5.7.0 - P-CSCF integrity protection - - - N1 N1-33 N1‑040474 revised 2004‑02‑23 IMS-CCR -
0498 5 F Rel-5 5.7.0 5.8.0 P-CSCF integrity protection NP-23 NP‑040027 approved N1 N1-33 N1‑040499 agreed 2004‑02‑23 IMS-CCR -
0498 5 F Rel-5 5.7.0 5.8.0 P-CSCF integrity protection NP-23 NP‑040027 approved N1 N1-33 N1‑040499 agreed 2004‑02‑23 IMS-CCR -
0499 - A Rel-6 6.0.0 - P-CSCF integrity protection - - - N1 N1-32 N1‑031380 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0499 1 A Rel-6 6.0.0 - P-CSCF integrity protection - - - N1 N1-32 N1‑031634 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0499 2 A Rel-6 6.0.0 - P-CSCF integrity protection - - - N1 N1-32 N1‑031718 withdrawn 2003‑11‑03 IMS-CCR - 2004‑01‑05
0499 3 A Rel-6 6.1.0 - P-CSCF integrity protection - - - N1 N1-33 N1‑040315 revised 2004‑02‑23 IMS-CCR -
0499 4 A Rel-6 6.1.0 - P-CSCF integrity protection - - - N1 N1-33 N1‑040475 revised 2004‑02‑23 IMS-CCR -
0499 5 A Rel-6 6.1.0 6.2.0 P-CSCF integrity protection NP-23 NP‑040027 approved N1 N1-33 N1‑040500 agreed 2004‑02‑23 IMS-CCR -
0499 5 A Rel-6 6.1.0 6.2.0 P-CSCF integrity protection NP-23 NP‑040027 approved N1 N1-33 N1‑040500 agreed 2004‑02‑23 IMS-CCR -
0500 - F Rel-5 5.6.0 - Definition of 'c=' line in SDP - - - N1 N1-32 N1‑031384 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0501 - A Rel-6 6.0.0 - Definition of 'c=' line in SDP - - - N1 N1-32 N1‑031385 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0502 - F Rel-5 5.6.0 - Update of HSS information at deregistration - - - N1 N1-32 N1‑031386 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0502 1 F Rel-5 5.6.0 - Update of HSS information at deregistration - - - N1 N1-32 N1‑031635 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0502 2 F Rel-5 5.6.0 5.7.0 Update of HSS information at deregistration NP-22 NP‑030476 approved N1 N1-32 N1‑031719 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0503 - A Rel-6 6.0.0 - Update of HSS information at deregistration - - - N1 N1-32 N1‑031387 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0503 1 A Rel-6 6.0.0 - Update of HSS information at deregistration - - - N1 N1-32 N1‑031636 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0503 2 A Rel-6 6.0.0 6.1.0 Update of HSS information at deregistration NP-22 NP‑030476 approved N1 N1-32 N1‑031720 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0504 - F Rel-5 5.6.0 - Check that IMPU is registered - - - N1 N1-32 N1‑031388 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0505 - A Rel-6 6.0.0 - Check that IMPU is registered - - - N1 N1-32 N1‑031389 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0506 - F Rel-5 5.6.0 - Unavailable definitions - - - N1 N1-32 N1‑031391 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0507 - F Rel-6 6.0.0 6.1.0 Unavailable definitions NP-22 NP‑030482 approved N1 N1-32 N1‑031392 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0508 - F Rel-5 5.6.0 5.7.0 Reference corrections NP-22 NP‑030476 approved N1 N1-32 N1‑031393 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0509 - A Rel-6 6.0.0 6.1.0 Reference corrections NP-22 NP‑030476 approved N1 N1-32 N1‑031394 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0510 - B Rel-6 6.0.0 - UICC related changes for IMS commonality and interoperability - - - N1 N1-32 N1‑031426 revised 2003‑11‑03 IMSCOOP - 2004‑01‑05
0510 1 F Rel-6 6.0.0 6.1.0 UICC related changes for IMS commonality and interoperability NP-22 NP‑030484 approved N1 N1-32 N1‑031682 agreed 2003‑11‑03 IMSCOOP - 2004‑01‑05
0511 - D Rel-6 6.0.0 6.1.0 Interoperability and commonality; definition of scope NP-22 NP‑030484 approved N1 N1-32 N1‑031427 agreed 2003‑11‑03 IMSCOOP - 2004‑01‑05
0512 - D Rel-6 6.0.0 6.1.0 Interoperability and commonality; addition of terminology NP-22 NP‑030484 approved N1 N1-32 N1‑031428 agreed 2003‑11‑03 IMSCOOP - 2004‑01‑05
0513 - D Rel-6 6.0.0 6.1.0 Interoperability and commonality; media grouping NP-22 NP‑030484 approved N1 N1-32 N1‑031429 agreed 2003‑11‑03 IMSCOOP - 2004‑01‑05
0514 - D Rel-6 6.0.0 - Interoperability and commonality; access network information - - - N1 N1-32 N1‑031430 rejected 2003‑11‑03 IMSCOOP - 2004‑01‑05
0515 - B Rel-6 6.0.0 6.1.0 Interoperability and commonality; charging information NP-22 NP‑030484 approved N1 N1-32 N1‑031431 agreed 2003‑11‑03 IMSCOOP - 2004‑01‑05
0516 - F Rel-5 5.6.0 - Use of DNS SRV - - - N1 N1-32 N1‑031432 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0517 - A Rel-6 6.0.0 - Use of DNS SRV - - - N1 N1-32 N1‑031433 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0518 - B Rel-6 6.0.0 - Profile support of RFC 3326: The Reason Header Field for the Session Initiation Protocol - - - N1 N1-32 N1‑031437 revised 2003‑11‑03 IMS2 - 2004‑01‑05
0518 1 B Rel-6 6.0.0 6.1.0 Profile support of RFC 3326: The Reason Header Field for the Session Initiation Protocol NP-22 NP‑030482 approved N1 N1-32 N1‑031681 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0519 - B Rel-6 6.0.0 6.1.0 Profile support of RFC 3581: An Extension to the Session Initiation Protocol (SIP) for Symmetric Response Routing NP-22 NP‑030482 approved N1 N1-32 N1‑031439 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0520 - F Rel-5 5.6.0 - P-Charging-Vector header - - - N1 N1-32 N1‑031440 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0521 - A Rel-6 6.0.0 - P-Charging-Vector header - - - N1 N1-32 N1‑031441 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0522 - F Rel-6 6.0.0 - Clause 9 restructuring - - - N1 N1-32 N1‑031442 revised 2003‑11‑03 IMSCOOP - 2004‑01‑05
0522 1 D Rel-6 6.0.0 6.1.0 Clause 9 restructuring NP-22 NP‑030484 approved N1 N1-32 N1‑031684 agreed 2003‑11‑03 IMSCOOP - 2004‑01‑05
0523 - F Rel-5 5.6.0 - Correct use of RAND during re-synchronisation failures - - - N1 N1-32 N1‑031444 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0523 1 F Rel-5 5.6.0 - Correct use of RAND during re-synchronisation failures - - - N1 N1-32 N1‑031614 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0523 2 F Rel-5 5.6.0 5.7.0 Correct use of RAND during re-synchronisation failures NP-22 NP‑030477 approved N1 N1-32 N1‑031711 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0524 - A Rel-6 6.0.0 - Correct use of RAND during re-synchronisation failures - - - N1 N1-32 N1‑031445 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0524 1 A Rel-6 6.0.0 - Correct use of RAND during re-synchronisation failures - - - N1 N1-32 N1‑031615 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0524 2 A Rel-6 6.0.0 6.1.0 Correct use of RAND during re-synchronisation failures NP-22 NP‑030477 approved N1 N1-32 N1‑031712 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0525 - F Rel-5 5.6.0 - Correction to description or RES/XRES usage - - - N1 N1-32 N1‑031447 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0525 1 F Rel-5 5.6.0 5.7.0 Correction to description or RES/XRES usage NP-22 NP‑030478 approved N1 N1-32 N1‑031616 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0526 - A Rel-6 6.0.0 - Correction to description or RES/XRES usage - - - N1 N1-32 N1‑031448 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0526 1 A Rel-6 6.0.0 6.1.0 Correction to description or RES/XRES usage NP-22 NP‑030478 approved N1 N1-32 N1‑031617 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0527 - F Rel-5 5.6.0 - Network check on Precondition - - - N1 N1-32 N1‑031455 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0528 - C Rel-6 6.0.0 - Network check on Precondition - - - N1 N1-32 N1‑031456 rejected 2003‑11‑03 IMS-CCR-IWIP - 2004‑01‑05
0529 - F Rel-6 6.0.0 6.1.0 Corrections on charging specification number NP-22 NP‑030483 approved N1 N1-32 N1‑031469 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0530 - F Rel-5 5.6.0 - Corrections on ICID for REGISTER - - - N1 N1-32 N1‑031470 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0530 1 F Rel-5 5.6.0 - Corrections on ICID for REGISTER - - - N1 N1-32 N1‑031602 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0530 2 F Rel-5 5.6.0 - Corrections on ICID for REGISTER NP-22 NP‑030465 withdrawn - - - 2003‑11‑03 IMS-CCR Revised from NP-030479 2004‑01‑05
0530 2 F Rel-5 5.6.0 - Corrections on ICID for REGISTER NP-22 NP‑030479 revised N1 N1-32 N1‑031640 agreed 2003‑11‑03 IMS-CCR Revised to NP-030581 2004‑01‑05
0530 3 F Rel-5 5.6.0 5.7.0 Corrections on ICID for REGISTER NP-22 NP‑030581 approved - - - 2003‑11‑03 IMS-CCR Revised from NP-030479 2004‑01‑05
0531 - A Rel-6 6.0.0 - Corrections on ICID for REGISTER - - - N1 N1-32 N1‑031471 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0531 1 A Rel-6 6.0.0 - Corrections on ICID for REGISTER - - - N1 N1-32 N1‑031603 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0531 2 A Rel-6 6.0.0 - Corrections on ICID for REGISTER NP-22 NP‑030466 withdrawn - - - 2003‑11‑03 IMS-CCR Revised from NP-030479 2004‑01‑05
0531 2 A Rel-6 6.0.0 - Corrections on ICID for REGISTER NP-22 NP‑030479 revised N1 N1-32 N1‑031641 agreed 2003‑11‑03 IMS-CCR Revised to NP-030581 2004‑01‑05
0531 3 A Rel-6 6.0.0 6.1.0 Corrections on ICID for REGISTER NP-22 NP‑030581 approved - - - 2003‑11‑03 IMS-CCR Revised from NP-030479 2004‑01‑05
0532 - F Rel-5 5.6.0 - Corrections on forking - - - N1 N1-32 N1‑031472 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0533 - F Rel-6 6.0.0 - Additional clarifications for forking - - - N1 N1-32 N1‑031473 postponed 2003‑11‑03 IMS2 - 2004‑01‑05
0534 - F Rel-5 5.6.0 - Corrections on IOI definition - - - N1 N1-32 N1‑031474 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0534 1 F Rel-5 5.6.0 - Corrections on IOI definition - - - N1 N1-32 N1‑031700 postponed 2003‑11‑03 IMS_CCR - 2004‑01‑05
0535 - A Rel-6 6.0.0 - Corrections on IOI definition - - - N1 N1-32 N1‑031475 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0535 1 A Rel-6 6.0.0 - Corrections on IOI definition - - - N1 N1-32 N1‑031701 postponed 2003‑11‑03 IMS_CCR - 2004‑01‑05
0536 - F Rel-5 5.6.0 - Corrections on the indicator for originating/terminating case - - - N1 N1-32 N1‑031476 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0537 - A Rel-6 6.0.0 - Corrections on the indicator for originating/terminating case - - - N1 N1-32 N1‑031477 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0538 - F Rel-5 5.6.0 - Corrections on requests terminated by the S-CSCF - - - N1 N1-32 N1‑031478 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0538 1 F Rel-5 5.6.0 - Corrections on requests terminated by the S-CSCF - - - N1 N1-32 N1‑031604 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0539 - A Rel-6 6.0.0 - Corrections on requests terminated by the S-CSCF - - - N1 N1-32 N1‑031479 revised 2003‑11‑03 IMS_CCR - 2004‑01‑05
0539 1 A Rel-6 6.0.0 - Corrections on requests terminated by the S-CSCF - - - N1 N1-32 N1‑031605 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0540 - F Rel-5 5.6.0 - Corrections on Via header - - - N1 N1-32 N1‑031480 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0541 - A Rel-6 6.0.0 - Corrections on Via header - - - N1 N1-32 N1‑031481 rejected 2003‑11‑03 IMS_CCR - 2004‑01‑05
0542 - F Rel-5 5.6.0 - Correction of user initiated re-registration - - - N1 N1-32 N1‑031485 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0542 1 F Rel-5 5.6.0 5.7.0 Correction of user initiated re-registration NP-22 NP‑030478 approved N1 N1-32 N1‑031618 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0543 - A Rel-6 6.0.0 - Correction of user initiated re-registration - - - N1 N1-32 N1‑031486 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0543 1 A Rel-6 6.0.0 6.1.0 Correction of user initiated re-registration NP-22 NP‑030478 approved N1 N1-32 N1‑031619 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0544 - F Rel-5 5.6.0 - SDP parameters necessary for charging - - - N1 N1-32 N1‑031499 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0545 - A Rel-6 6.0.0 - SDP parameters necessary for charging - - - N1 N1-32 N1‑031500 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0546 - F Rel-5 5.6.0 - Corrections on P-Charging-Function adrress related procedure - - - N1 N1-32 N1‑031514 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0547 - A Rel-6 6.0.0 - Corrections on P-Charging-Function adrress related procedure - - - N1 N1-32 N1‑031515 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0548 - F Rel-5 5.6.0 - Session initiation without preconditions - - - N1 N1-32 N1‑031538 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0549 - A Rel-6 6.0.0 - Session initiation without preconditions - - - N1 N1-32 N1‑031539 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0549 1 A Rel-6 6.0.0 - Session initiation without preconditions - - - N1 N1-32 N1‑031642 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0550 - F Rel-5 5.6.0 - IMS trust domain in Rel 5 - - - N1 N1-32 N1‑031541 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0550 1 F Rel-5 5.6.0 5.7.0 IMS trust domain in Rel 5 NP-22 NP‑030478 approved N1 N1-32 N1‑031621 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0551 - B Rel-6 6.0.0 - IMS trust domain in Rel 6 - - - N1 N1-32 N1‑031542 revised 2003‑11‑03 IMS2 - 2004‑01‑05
0551 1 C Rel-6 6.0.0 6.1.0 IMS trust domain in Rel 6 NP-22 NP‑030483 approved N1 N1-32 N1‑031622 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0552 - B Rel-6 6.0.0 - Session timer - - - N1 N1-32 N1‑031543 revised 2003‑11‑03 IMS2 - 2004‑01‑05
0552 1 B Rel-6 6.0.0 - Session timer - - - N1 N1-32 N1‑031678 postponed 2003‑11‑03 IMS2 - 2004‑01‑05
0553 - F Rel-5 5.6.0 - Privacy to the P-Asserted-Idenity - - - N1 N1-32 N1‑031544 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0554 - A Rel-6 6.0.0 - Privacy to the P-Asserted-Idenity - - - N1 N1-32 N1‑031545 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0555 - F Rel-5 5.6.0 - P-CSCF and UE handling of Security Associations - - - N1 N1-32 N1‑031547 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0555 1 F Rel-5 5.6.0 5.7.0 P-CSCF and UE handling of Security Associations NP-22 NP‑030478 approved N1 N1-32 N1‑031623 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0556 - A Rel-6 6.0.0 - P-CSCF and UE handling of Security Associations - - - N1 N1-32 N1‑031548 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0556 1 A Rel-6 6.0.0 6.1.0 P-CSCF and UE handling of Security Associations NP-22 NP‑030478 approved N1 N1-32 N1‑031624 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0557 - F Rel-5 5.6.0 - Precondition Fallback - - - N1 N1-32 N1‑031549 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0558 - F Rel-5 5.6.0 - S-CSCF and P-CSCF re-selection - - - N1 N1-32 N1‑031551 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0558 1 F Rel-5 5.6.0 - S-CSCF and P-CSCF re-selection - - - N1 N1-32 N1‑031702 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0559 - F Rel-6 6.0.0 - S-CSCF and P-CSCF re-selection - - - N1 N1-32 N1‑031552 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0559 1 F Rel-6 6.0.0 - S-CSCF and P-CSCF re-selection - - - N1 N1-32 N1‑031703 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0560 - B Rel-6 6.0.0 - SDP offer handling in SIP responses in S-CSCF and P-CSCF - - - N1 N1-32 N1‑031573 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0560 1 B Rel-6 6.0.0 - SDP offer handling in SIP responses in S-CSCF and P-CSCF - - - N1 N1-32 N1‑031704 revised 2003‑11‑03 IMS2 - 2004‑01‑05
0560 2 B Rel-6 6.0.0 6.1.0 SDP offer handling in SIP responses in S-CSCF and P-CSCF NP-22 NP‑030483 approved N1 N1-32 N1‑031727 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0561 - F Rel-5 5.6.0 - Removal of RFC 3486 - - - N1 N1-32 N1‑031574 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0562 - A Rel-6 6.0.0 - Removal of RFC 3486 - - - N1 N1-32 N1‑031575 postponed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0563 - F Rel-5 5.6.0 - SIP compression - - - N1 N1-32 N1‑031576 rejected 2003‑11‑03 IMS-CCR - 2004‑01‑05
0564 - A Rel-6 6.0.0 - SIP compression - - - N1 N1-32 N1‑031577 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0564 1 F Rel-6 6.0.0 6.1.0 SIP compression NP-22 NP‑030483 approved N1 N1-32 N1‑031705 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0565 - F Rel-5 5.6.0 5.7.0 Sending challenge NP-22 NP‑030478 approved N1 N1-32 N1‑031579 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0566 - A Rel-6 6.0.0 6.1.0 Sending challenge NP-22 NP‑030478 approved N1 N1-32 N1‑031580 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0567 - F Rel-5 5.6.0 - Reg-await-auth timer value - - - N1 N1-32 N1‑031581 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0567 1 F Rel-5 5.6.0 - Reg-await-auth timer value - - - N1 N1-32 N1‑031625 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0567 2 F Rel-5 5.6.0 5.7.0 Reg-await-auth timer value NP-22 NP‑030480 approved N1 N1-32 N1‑031715 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0568 - A Rel-6 6.0.0 - Reg-await-auth timer value - - - N1 N1-32 N1‑031582 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0568 1 A Rel-6 6.0.0 - Reg-await-auth timer value - - - N1 N1-32 N1‑031626 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0568 2 A Rel-6 6.0.0 6.1.0 Reg-await-auth timer value NP-22 NP‑030480 approved N1 N1-32 N1‑031716 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0569 - B Rel-6 6.0.0 - Determination of S-CSCF role - - - N1 N1-32 N1‑031583 rejected 2003‑11‑03 IMS2 - 2004‑01‑05
0570 - F Rel-5 5.6.0 - Network initiated deregistration - - - N1 N1-32 N1‑031585 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0570 1 F Rel-5 5.6.0 5.7.0 Network initiated deregistration NP-22 NP‑030480 approved N1 N1-32 N1‑031706 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0571 - A Rel-6 6.0.0 - Network initiated deregistration - - - N1 N1-32 N1‑031586 revised 2003‑11‑03 IMS-CCR - 2004‑01‑05
0571 1 A Rel-6 6.0.0 6.1.0 Network initiated deregistration NP-22 NP‑030480 approved N1 N1-32 N1‑031707 agreed 2003‑11‑03 IMS-CCR - 2004‑01‑05
0572 - D Rel-6 6.0.0 6.1.0 Text harmonisation with 3GPP2 NP-22 NP‑030483 approved N1 N1-32 N1‑031589 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0573 - B Rel-6 6.0.0 - Procedures in the absence of UICC - - - N1 N1-32 N1‑031595 revised 2003‑11‑03 IMS2 - 2004‑01‑05
0573 1 B Rel-6 6.0.0 6.1.0 Procedures in the absence of UICC NP-22 NP‑030483 approved N1 N1-32 N1‑031680 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0574 - D Rel-6 6.0.0 - Appropriate linkage to new Annex C - - - N1 N1-32 N1‑031596 rejected 2003‑11‑03 IMSCOOP - 2004‑01‑05
0575 - D Rel-6 6.0.0 - P-Access-Network-Info changes - - - N1 N1-32 N1‑031597 revised 2003‑11‑03 IMS2 - 2004‑01‑05
0575 1 D Rel-6 6.0.0 6.1.0 P-Access-Network-Info changes NP-22 NP‑030483 approved N1 N1-32 N1‑031683 agreed 2003‑11‑03 IMS2 - 2004‑01‑05
0576 - F Rel-5 5.6.0 - UE procedures for S-CSCF and P-CSCF re-selection - - - N1 N1-32 N1‑031713 - 2003‑11‑03 IMS-CCR - 2004‑01‑05
0577 - F Rel-6 6.0.0 - UE procedures for S-CSCF and P-CSCF re-selection - - - N1 N1-32 N1‑031714 - 2003‑11‑03 IMS-CCR - 2004‑01‑05
0578 - B Rel-6 6.1.0 - UE requesting no-fork - - - N1 N1-32b N1‑040054 revised 2004‑02‑10 IMS2 -
0578 1 B Rel-6 6.1.0 6.2.0 UE requesting no-fork NP-23 NP‑040032 approved N1 N1-32b N1‑040184 agreed 2004‑02‑10 IMS2 -
0578 1 B Rel-6 6.1.0 6.2.0 UE requesting no-fork NP-23 NP‑040032 approved N1 N1-32b N1‑040184 agreed 2004‑02‑10 IMS2 -
0578 2 B Rel-6 6.1.0 - UE requesting no fork - - - N1 N1-33 N1‑040324 revised 2004‑02‑23 IMS2 -
0578 3 B Rel-6 6.1.0 - UE requesting no fork - - - N1 N1-33 N1‑040442 - 2004‑02‑23 IMS2 Not available at WG mtg
0579 - B Rel-6 6.1.0 - Inclusion of caller preferences into profile - - - N1 N1-32b N1‑040058 - 2004‑02‑10 IMS2 Not available at WG mtg
0579 1 B Rel-6 6.1.0 6.2.0 Inclusion of caller preferences into profile NP-23 NP‑040032 approved N1 N1-33 N1‑040284 agreed 2004‑02‑23 IMS2 -
0579 1 B Rel-6 6.1.0 6.2.0 Inclusion of caller preferences into profile NP-23 NP‑040032 approved N1 N1-33 N1‑040284 agreed 2004‑02‑23 IMS2 -
0580 - F Rel-6 5.7.0 - Sending authentication challenge - - - N1 N1-32b N1‑040088 postponed 2004‑02‑10 IMS2 -
0581 - A Rel-6 6.1.0 - Sending authentication challenge - - - N1 N1-32b N1‑040089 postponed 2004‑02‑10 IMS2 -
0582 - B Rel-6 6.1.0 - DoS attack - - - N1 N1-32b N1‑040090 postponed 2004‑02‑10 IMS2 -
0583 - F Rel-6 6.1.0 - S-CSCF and P-CSCF Re-Selection - - - N1 N1-32b N1‑040114 revised 2004‑02‑10 IMS2 -
0583 1 F Rel-6 6.1.0 - S-CSCF Re-Selection - - - N1 N1-32b N1‑040159 postponed 2004‑02‑10 IMS2 -
0584 - F Rel-6 6.1.0 - P-CSCF Re-selection - - - N1 N1-32b N1‑040180 postponed 2004‑02‑10 IMS2 -
0585 - F Rel-5 5.7.0 - Network-initiated re-authentication - - - N1 N1-33 N1‑040220 revised 2004‑02‑23 IMS-CCR -
0585 1 F Rel-5 5.7.0 5.8.0 Network-initiated re-authentication NP-23 NP‑040027 approved N1 N1-33 N1‑040392 agreed 2004‑02‑23 IMS-CCR -
0585 1 F Rel-5 5.7.0 5.8.0 Network-initiated re-authentication NP-23 NP‑040027 approved N1 N1-33 N1‑040392 agreed 2004‑02‑23 IMS-CCR -
0586 - A Rel-6 6.1.0 - Network-initiated re-authentication - - - N1 N1-33 N1‑040219 revised 2004‑02‑23 IMS-CCR -
0586 1 A Rel-6 6.1.0 6.2.0 Network-initiated re-authentication NP-23 NP‑040027 approved N1 N1-33 N1‑040391 agreed 2004‑02‑23 IMS-CCR -
0586 1 A Rel-6 6.1.0 6.2.0 Network-initiated re-authentication NP-23 NP‑040027 approved N1 N1-33 N1‑040391 agreed 2004‑02‑23 IMS-CCR -
0587 - F Rel-5 5.7.0 - Re-authentication - Abnormal cases - - - N1 N1-33 N1‑040222 revised 2004‑02‑23 IMS-CCR -
0587 1 F Rel-5 5.7.0 - Re-authentication - Abnormal cases - - - N1 N1-33 N1‑040394 withdrawn 2004‑02‑23 IMS-CCR -
0588 - A Rel-6 6.1.0 - Re-authentication - Abnormal cases - - - N1 N1-33 N1‑040221 revised 2004‑02‑23 IMS-CCR -
0588 1 F Rel-6 6.1.0 6.2.0 Re-authentication - Abnormal cases NP-23 NP‑040032 approved N1 N1-33 N1‑040393 agreed 2004‑02‑23 IMS2 -
0588 1 F Rel-6 6.1.0 6.2.0 Re-authentication - Abnormal cases NP-23 NP‑040032 approved N1 N1-33 N1‑040393 agreed 2004‑02‑23 IMS2 -
0589 - F Rel-5 5.7.0 - Subsequent requests - - - N1 N1-33 N1‑040224 withdrawn 2004‑02‑23 IMS-CCR -
0590 - A Rel-6 6.1.0 - Subsequent requests - - - N1 N1-33 N1‑040223 withdrawn 2004‑02‑23 IMS-CCR -
0591 - F Rel-5 5.7.0 - Itegrity protected - correction - - - N1 N1-33 N1‑040226 revised 2004‑02‑23 IMS-CCR -
0591 1 F Rel-5 5.7.0 5.8.0 Itegrity protected - correction NP-23 NP‑040027 approved N1 N1-33 N1‑040399 agreed 2004‑02‑23 IMS-CCR -
0591 1 F Rel-5 5.7.0 5.8.0 Itegrity protected - correction NP-23 NP‑040027 approved N1 N1-33 N1‑040399 agreed 2004‑02‑23 IMS-CCR -
0592 - A Rel-6 6.1.0 - Itegrity protected - correction - - - N1 N1-33 N1‑040225 revised 2004‑02‑23 IMS-CCR -
0592 1 A Rel-6 6.1.0 6.2.0 Itegrity protected - correction NP-23 NP‑040027 approved N1 N1-33 N1‑040398 agreed 2004‑02‑23 IMS-CCR -
0592 1 A Rel-6 6.1.0 6.2.0 Itegrity protected - correction NP-23 NP‑040027 approved N1 N1-33 N1‑040398 agreed 2004‑02‑23 IMS-CCR -
0593 - F Rel-5 5.7.0 - Possibility for the network to check Preconditions - - - N1 N1-33 N1‑040235 revised 2004‑02‑23 IMS-CCR -
0593 1 F Rel-5 5.7.0 - Possibility for the network to check Preconditions - - - N1 N1-33 N1‑040457 postponed 2004‑02‑23 IMS-CCR -
0593 2 F Rel-5 5.8.0 - Possibility for the network to check Preconditions - - - N1 N1-34 N1‑040774 postponed 2004‑05‑18 IMS-CCR - 2004‑05‑26
0594 - A Rel-6 6.1.0 - Possibility for the network to check Preconditions - - - N1 N1-33 N1‑040236 revised 2004‑02‑23 IMS-CCR -
0594 1 A Rel-6 6.1.0 - Possibility for the network to check Preconditions - - - N1 N1-33 N1‑040458 postponed 2004‑02‑23 IMS-CCR -
0594 2 A Rel-6 6.2.0 - Possibility for the network to check Preconditions - - - N1 N1-34 N1‑040775 postponed 2004‑05‑18 IMS-CCR - 2004‑05‑26
0595 - F Rel-5 5.7.0 - Sec-agree parameter in Proxy-Require header - - - N1 N1-33 N1‑040237 rejected 2004‑02‑23 IMS-CCR -
0596 - A Rel-6 6.1.0 - Sec-agree parameter in Proxy-Require header - - - N1 N1-33 N1‑040238 revised 2004‑02‑23 IMS-CCR -
0596 1 F Rel-6 6.1.0 6.2.0 Sec-agree parameter in Proxy-Require header NP-23 NP‑040032 approved N1 N1-33 N1‑040400 agreed 2004‑02‑23 IMS2 -
0596 1 F Rel-6 6.1.0 6.2.0 Sec-agree parameter in Proxy-Require header NP-23 NP‑040032 approved N1 N1-33 N1‑040400 agreed 2004‑02‑23 IMS2 -
0597 - F Rel-5 5.7.0 - Correction to P-CSCF procedures on including charging information - - - N1 N1-33 N1‑040251 revised 2004‑02‑23 IMS-CCR -
0597 1 F Rel-5 5.7.0 - Correction to P-CSCF procedures on including charging information - - - N1 N1-33 N1‑040395 withdrawn 2004‑02‑23 IMS-CCR -
0598 - A Rel-6 6.1.0 - Correction to P-CSCF procedures on including charging information - - - N1 N1-33 N1‑040252 revised 2004‑02‑23 IMS-CCR -
0598 1 A Rel-6 6.1.0 - Correction to P-CSCF procedures on including charging information - - - N1 N1-33 N1‑040396 withdrawn 2004‑02‑23 IMS-CCR -
0599 - F Rel-5 5.7.0 - Record-Route in target refresh and subsequent request - - - N1 N1-33 N1‑040265 revised 2004‑02‑23 IMS-CCR -
0599 1 F Rel-5 5.7.0 - Record-Route in target refresh and subsequent request - - - N1 N1-33 N1‑040401 revised 2004‑02‑23 IMS-CCR -
0599 2 F Rel-5 5.7.0 5.8.0 Record-Route in target refresh and subsequent request NP-23 NP‑040027 approved N1 N1-33 N1‑040480 agreed 2004‑02‑23 IMS-CCR -
0599 2 F Rel-5 5.7.0 5.8.0 Record-Route in target refresh and subsequent request NP-23 NP‑040027 approved N1 N1-33 N1‑040480 agreed 2004‑02‑23 IMS-CCR -
0600 - A Rel-6 6.1.0 - Record-Route in target refresh and subsequent request - - - N1 N1-33 N1‑040266 revised 2004‑02‑23 IMS-CCR -
0600 1 A Rel-6 6.1.0 - Record-Route in target refresh and subsequent request - - - N1 N1-33 N1‑040402 revised 2004‑02‑23 IMS-CCR -
0600 2 A Rel-6 6.1.0 6.2.0 Record-Route in target refresh and subsequent request NP-23 NP‑040027 approved N1 N1-33 N1‑040481 agreed 2004‑02‑23 IMS-CCR -
0600 2 A Rel-6 6.1.0 6.2.0 Record-Route in target refresh and subsequent request NP-23 NP‑040027 approved N1 N1-33 N1‑040481 agreed 2004‑02‑23 IMS-CCR -
0601 - F Rel-5 5.7.0 - Missing statements regarding P-Charging-Function-Addresses - - - N1 N1-33 N1‑040286 revised 2004‑02‑23 IMS-CCR -
0601 1 F Rel-5 5.7.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040028 rejected N1 N1-33 N1‑040403 agreed 2004‑02‑23 IMS-CCR -
0601 1 F Rel-5 5.7.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040028 rejected N1 N1-33 N1‑040403 agreed 2004‑02‑23 IMS-CCR -
0601 2 F Rel-5 5.7.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040039 rejected - - - 2004‑02‑23 IMS-CCR -
0601 2 F Rel-5 5.7.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040039 rejected - - - 2004‑02‑23 IMS-CCR -
0602 - A Rel-6 6.1.0 - Missing statements regarding P-Charging-Function-Addresses - - - N1 N1-33 N1‑040287 revised 2004‑02‑23 IMS-CCR -
0602 1 A Rel-6 6.1.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040028 rejected N1 N1-33 N1‑040404 agreed 2004‑02‑23 IMS-CCR -
0602 1 A Rel-6 6.1.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040028 rejected N1 N1-33 N1‑040404 agreed 2004‑02‑23 IMS-CCR -
0602 2 A Rel-6 6.1.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040040 rejected - - - 2004‑02‑23 IMS-CCR -
0602 2 A Rel-6 6.1.0 - Missing statements regarding P-Charging-Function-Addresses NP-23 NP‑040040 rejected - - - 2004‑02‑23 IMS-CCR -
0603 - D Rel-6 6.1.0 6.2.0 Cleanup for IP-CAN and GPRS NP-23 NP‑040035 approved N1 N1-33 N1‑040304 agreed 2004‑02‑23 IMSCOOP -
0603 - D Rel-6 6.1.0 6.2.0 Cleanup for IP-CAN and GPRS NP-23 NP‑040035 approved N1 N1-33 N1‑040304 agreed 2004‑02‑23 IMSCOOP -
0604 - B Rel-6 6.1.0 6.2.0 Forking in S-CSCF NP-23 NP‑040032 approved N1 N1-33 N1‑040325 agreed 2004‑02‑23 IMS2 -
0604 - B Rel-6 6.1.0 6.2.0 Forking in S-CSCF NP-23 NP‑040032 approved N1 N1-33 N1‑040325 agreed 2004‑02‑23 IMS2 -
0605 - B Rel-6 6.1.0 - Determination of S-CSCF role - - - N1 N1-33 N1‑040326 revised 2004‑02‑23 IMS2 -
0605 1 B Rel-6 6.1.0 - Determination of S-CSCF role - - - N1 N1-33 N1‑040381 revised 2004‑02‑23 IMS2 -
0605 2 B Rel-6 6.1.0 - Determination of S-CSCF role NP-23 NP‑040033 revised N1 N1-33 N1‑040464 agreed 2004‑02‑23 IMS2 -
0605 2 B Rel-6 6.1.0 - Determination of S-CSCF role NP-23 NP‑040033 revised N1 N1-33 N1‑040464 agreed 2004‑02‑23 IMS2 -
0605 3 B Rel-6 6.1.0 6.2.0 Determination of S-CSCF role NP-23 NP‑040108 approved Lucent, No - - 2004‑03‑04 IMS2 - 2004‑03‑10
0605 3 B Rel-6 6.1.0 6.2.0 Determination of S-CSCF role NP-23 NP‑040108 approved Lucent, No - - 2004‑03‑04 IMS2 - 2004‑03‑10
0606 - F Rel-6 6.1.0 - SDP offer handling in SIP responses in S-CSCF and P-CSCF - - - N1 N1-33 N1‑040327 postponed 2004‑02‑23 IMS2 -
0607 - F Rel-5 5.7.0 - Unprotected deregistration - - - N1 N1-33 N1‑040329 revised 2004‑02‑23 IMS-CCR -
0607 1 F Rel-5 5.7.0 - Unprotected deregistration - - - N1 N1-33 N1‑040410 revised 2004‑02‑23 IMS-CCR -
0607 2 F Rel-5 5.7.0 - Unprotected deregistration NP-23 NP‑040029 revised N1 N1-33 N1‑040483 agreed 2004‑02‑23 IMS-CCR -
0607 2 F Rel-5 5.7.0 - Unprotected deregistration NP-23 NP‑040029 revised N1 N1-33 N1‑040483 agreed 2004‑02‑23 IMS-CCR -
0607 3 F Rel-5 5.7.0 5.8.0 Unprotected deregistration NP-23 NP‑040134 approved N1 - - 2004‑02‑23 IMS-CCR - 2004‑03‑12
0607 3 F Rel-5 5.7.0 5.8.0 Unprotected deregistration NP-23 NP‑040134 approved N1 - - 2004‑02‑23 IMS-CCR - 2004‑03‑12
0608 - A Rel-6 6.1.0 - Unprotected deregistration - - - N1 N1-33 N1‑040328 revised 2004‑02‑23 IMS2 -
0608 1 A Rel-6 6.1.0 - Unprotected deregistration - - - N1 N1-33 N1‑040409 revised 2004‑02‑23 IMS2 -
0608 2 A Rel-6 6.1.0 - Unprotected deregistration NP-23 NP‑040029 revised N1 N1-33 N1‑040482 agreed 2004‑02‑23 IMS-CCR -
0608 2 A Rel-6 6.1.0 - Unprotected deregistration NP-23 NP‑040029 revised N1 N1-33 N1‑040482 agreed 2004‑02‑23 IMS-CCR -
0608 3 A Rel-6 6.1.0 6.2.0 Unprotected deregistration NP-23 NP‑040134 approved N1 - - 2004‑02‑23 IMS-CCR - 2004‑03‑12
0608 3 A Rel-6 6.1.0 6.2.0 Unprotected deregistration NP-23 NP‑040134 approved N1 - - 2004‑02‑23 IMS-CCR - 2004‑03‑12
0609 - F Rel-5 5.7.0 5.8.0 Sending authentication challenge NP-23 NP‑040029 approved N1 N1-33 N1‑040330 agreed 2004‑02‑23 IMS-CCR -
0609 - F Rel-5 5.7.0 5.8.0 Sending authentication challenge NP-23 NP‑040029 approved N1 N1-33 N1‑040330 agreed 2004‑02‑23 IMS-CCR -
0610 - A Rel-6 6.1.0 6.2.0 Sending authentication challenge NP-23 NP‑040029 approved N1 N1-33 N1‑040331 agreed 2004‑02‑23 IMS-CCR -
0610 - A Rel-6 6.1.0 6.2.0 Sending authentication challenge NP-23 NP‑040029 approved N1 N1-33 N1‑040331 agreed 2004‑02‑23 IMS-CCR -
0611 - F Rel-5 5.7.0 - DoS attack prevention - - - N1 N1-33 N1‑040333 revised 2004‑02‑23 IMS-CCR -
0611 1 F Rel-5 5.7.0 - DoS attack prevention - - - N1 N1-33 N1‑040412 - 2004‑02‑23 IMS-CCR Not available at WG mtg
0612 - A Rel-6 6.1.0 - DoS attack prevention - - - N1 N1-33 N1‑040332 revised 2004‑02‑23 IMS2 -
0612 1 A Rel-6 6.1.0 - DoS attack prevention - - - N1 N1-33 N1‑040411 - 2004‑02‑23 IMS2 Not available at WG mtg
0613 - F Rel-6 6.1.0 6.2.0 Reference to PDF operation NP-23 NP‑040033 approved N1 N1-33 N1‑040334 agreed 2004‑02‑23 IMS2 -
0613 - F Rel-6 6.1.0 6.2.0 Reference to PDF operation NP-23 NP‑040033 approved N1 N1-33 N1‑040334 agreed 2004‑02‑23 IMS2 -
0614 - F Rel-5 5.7.0 - Support of MESSAGE (Profile Tables) - - - N1 N1-33 N1‑040336 revised 2004‑02‑23 IMS-CCR -
0614 1 F Rel-5 5.7.0 5.8.0 Support of MESSAGE (Profile Tables) NP-23 NP‑040029 approved N1 N1-33 N1‑040465 agreed 2004‑02‑23 IMS-CCR -
0614 1 F Rel-5 5.7.0 5.8.0 Support of MESSAGE (Profile Tables) NP-23 NP‑040029 approved N1 N1-33 N1‑040465 agreed 2004‑02‑23 IMS-CCR -
0615 - A Rel-6 6.1.0 - Support of MESSAGE (Profile Tables) - - - N1 N1-33 N1‑040337 revised 2004‑02‑23 IMS-CCR -
0615 1 A Rel-6 6.1.0 6.2.0 Support of MESSAGE (Profile Tables) NP-23 NP‑040029 approved N1 N1-33 N1‑040466 agreed 2004‑02‑23 IMS-CCR -
0615 1 A Rel-6 6.1.0 6.2.0 Support of MESSAGE (Profile Tables) NP-23 NP‑040029 approved N1 N1-33 N1‑040466 agreed 2004‑02‑23 IMS-CCR -
0616 - B Rel-6 6.1.0 - Introduction of PSI Routing to 24.229 - - - N1 N1-33 N1‑040342 revised 2004‑02‑23 IMS2 -
0616 1 B Rel-6 6.1.0 - Introduction of PSI Routing to 24.229 - - - N1 N1-33 N1‑040443 revised 2004‑02‑23 IMS2 -
0616 2 B Rel-6 6.1.0 6.2.0 Introduction of PSI Routing to 24.229 NP-23 NP‑040033 approved N1 N1-33 N1‑040487 agreed 2004‑02‑23 IMS2 -
0616 2 B Rel-6 6.1.0 6.2.0 Introduction of PSI Routing to 24.229 NP-23 NP‑040033 approved N1 N1-33 N1‑040487 agreed 2004‑02‑23 IMS2 -
0617 - B Rel-6 6.1.0 - P-CSCF Re-selection - - - N1 N1-33 N1‑040343 revised 2004‑02‑23 IMS2 -
0617 1 B Rel-6 6.1.0 6.2.0 P-CSCF Re-selection NP-23 NP‑040033 approved N1 N1-33 N1‑040463 agreed 2004‑02‑23 IMS2 -
0617 1 B Rel-6 6.1.0 6.2.0 P-CSCF Re-selection NP-23 NP‑040033 approved N1 N1-33 N1‑040463 agreed 2004‑02‑23 IMS2 -
0618 - B Rel-6 6.1.0 6.2.0 I-CSCF does not re-select S-CSCF during re-registration NP-23 NP‑040033 approved N1 N1-33 N1‑040344 agreed 2004‑02‑23 IMS2 -
0618 - B Rel-6 6.1.0 6.2.0 I-CSCF does not re-select S-CSCF during re-registration NP-23 NP‑040033 approved N1 N1-33 N1‑040344 agreed 2004‑02‑23 IMS2 -
0619 - B Rel-6 6.1.0 - S-CSCF Re-Selection - - - N1 N1-33 N1‑040345 rejected 2004‑02‑23 IMS2 -
0620 - B Rel-6 6.1.0 - Handling of media authorization token in case of instant messaging - - - N1 N1-33 N1‑040359 revised 2004‑02‑23 IMS2 -
0620 1 B Rel-6 6.1.0 6.2.0 Handling of media authorization token due to messaging NP-23 NP‑040033 approved N1 N1-33 N1‑040430 agreed 2004‑02‑23 IMS2 -
0620 1 B Rel-6 6.1.0 6.2.0 Handling of media authorization token due to messaging NP-23 NP‑040033 approved N1 N1-33 N1‑040430 agreed 2004‑02‑23 IMS2 -
0621 2 F Rel-6 6.2.0 6.3.0 Forking requests terminating at the served user NP-24 NP‑040191 approved N1 N1-34 N1‑040739 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0622 1 B Rel-6 6.2.0 - Interworking with non-IMS SIP clients - - - N1 N1-34 N1‑040962 - 2004‑05‑18 IMS2 - 2004‑05‑26
0624 1 D Rel-6 6.2.0 6.3.0 Abbreviations NP-24 NP‑040191 approved N1 N1-34 N1‑040691 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0625 3 B Rel-6 6.2.0 - Removal of restriction for multiple SIP sessions on a single PDP context - - - N1 N1-34 N1‑040747 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0625 4 B Rel-6 6.2.0 - Removal of restriction for multiple SIP sessions on a single PDP context - - - N1 N1-34 N1‑040803 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0625 5 B Rel-6 6.2.0 6.3.0 Removal of restriction for multiple SIP sessions on a single PDP context NP-24 NP‑040191 approved N1 N1-34 N1‑041053 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0626 2 C Rel-6 6.2.0 - Record route in S-CSCF - - - N1 N1-34 N1‑040892 revised 2004‑05‑18 IMS-2 - 2004‑05‑26
0626 3 C Rel-6 6.2.0 6.3.0 Record route in S-CSCF NP-24 NP‑040191 approved N1 N1-34 N1‑041061 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0627 2 A Rel-6 6.2.0 - Correction of reception of media authorization token - - - N1 N1-34 N1‑040922 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0627 3 A Rel-6 6.2.0 6.3.0 Correction of reception of media authorization token NP-24 NP‑040189 approved N1 N1-34 N1‑040994 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0628 1 F Rel-6 6.2.0 - Introduction of PSI Routing to 24.229 - - - N1 N1-34 N1‑040695 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0628 2 F Rel-6 6.2.0 - Introduction of PSI Routing to 24.229 - - - N1 N1-34 N1‑040860 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0628 3 F Rel-6 6.2.0 6.3.0 Introduction of PSI Routing to 24.229 NP-24 NP‑040191 approved N1 N1-34 N1‑041059 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0629 1 B Rel-6 6.2.0 - Addition of PRESNC material - - - N1 N1-34 N1‑040766 revised 2004‑05‑18 PRESNC - 2004‑05‑26
0629 2 B Rel-6 6.2.0 6.3.0 Addition of PRESNC material NP-24 NP‑040198 approved N1 N1-34 N1‑040996 agreed 2004‑05‑18 PRESNC - 2004‑06‑03
0630 - F Rel-5 5.8.0 - Missing statements regarding P-Charging-Function-Addresses header - - - N1 N1-34 N1‑040770 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0630 1 F Rel-5 5.8.0 5.9.0 Missing statements regarding P-Charging-Function-Addresses header NP-24 NP‑040189 approved N1 N1-34 N1‑040986 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0631 - A Rel-6 6.2.0 - Missing statements regarding P-Charging-Function-Addresses header - - - N1 N1-34 N1‑040771 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0631 1 A Rel-6 6.2.0 6.3.0 Missing statements regarding P-Charging-Function-Addresses header NP-24 NP‑040189 approved N1 N1-34 N1‑040987 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0632 - F Rel-5 5.8.0 - Corrections on Record-Route header - - - N1 N1-34 N1‑040772 rejected 2004‑05‑18 IMS-CCR - 2004‑05‑26
0633 - A Rel-6 6.2.0 - Corrections on Record-Route header - - - N1 N1-34 N1‑040773 rejected 2004‑05‑18 IMS-CCR - 2004‑05‑26
0634 - F Rel-6 6.2.0 - Multiple registrations - - - N1 N1-34 N1‑040776 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0634 1 F Rel-6 6.2.0 6.3.0 Multiple registrations NP-24 NP‑040191 approved N1 N1-34 N1‑041054 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0635 - F Rel-6 6.2.0 - Network-initiated deregistration - - - N1 N1-34 N1‑040777 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0635 1 F Rel-6 6.2.0 6.3.0 Network-initiated deregistration NP-24 NP‑040192 approved N1 N1-34 N1‑041055 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0636 - F Rel-6 6.2.0 6.3.0 Network-initiated re-authentication NP-24 NP‑040192 approved N1 N1-34 N1‑040778 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0637 - F Rel-6 6.2.0 - Mobile-initiated deregistration - - - N1 N1-34 N1‑040779 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0637 1 F Rel-6 6.2.0 6.3.0 Mobile-initiated deregistration NP-24 NP‑040192 approved N1 N1-34 N1‑041056 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0638 - F Rel-6 6.2.0 - Notification about registration state - - - N1 N1-34 N1‑040780 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0638 1 F Rel-6 6.2.0 6.3.0 Notification about registration state NP-24 NP‑040192 approved N1 N1-34 N1‑041057 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0639 - F Rel-6 6.2.0 - Subscription to registration event - - - N1 N1-34 N1‑040781 postponed 2004‑05‑18 IMS2 - 2004‑05‑26
0639 1 F Rel-6 6.3.0 - Subscription to registration event - - - N1 N1-35 N1‑041359 withdrawn 2004‑07‑29 IMS2 - 2004‑09‑08
0640 - F Rel-6 6.2.0 - Implicitly registered public user identities - - - N1 N1-34 N1‑040782 postponed 2004‑05‑18 IMS2 - 2004‑05‑26
0641 - F Rel-5 5.8.0 - Syntax of the extension to the P-Charging-Vector header field - - - N1 N1-34 N1‑040853 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0641 1 F Rel-5 5.8.0 - Syntax of the extension to the P-Charging-Vector header field - - - N1 N1-34 N1‑040988 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0641 2 F Rel-5 5.8.0 - Syntax of the extension to the P-Charging-Vector header field - - - N1 N1-34 N1‑041090 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0641 3 F Rel-5 5.8.0 5.9.0 Syntax of the extension to the P-Charging-Vector header field NP-24 NP‑040189 approved N1 N1-34 N1‑041099 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0642 - A Rel-6 6.2.0 - Syntax of the extension to the P-Charging-Vector header field - - - N1 N1-34 N1‑040854 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0642 1 A Rel-6 6.2.0 - Syntax of the extension to the P-Charging-Vector header field - - - N1 N1-34 N1‑040989 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0642 2 A Rel-6 6.2.0 - Syntax of the extension to the P-Charging-Vector header field - - - N1 N1-34 N1‑041091 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0642 3 A Rel-6 6.2.0 6.3.0 Syntax of the extension to the P-Charging-Vector header field NP-24 NP‑040189 approved N1 N1-34 N1‑041100 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0643 - B Rel-6 6.2.0 - Session Timer - - - N1 N1-34 N1‑040872 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0643 1 B Rel-6 6.2.0 - Session Timer - - - N1 N1-34 N1‑041060 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0643 2 B Rel-6 6.2.0 6.3.0 Session Timer NP-24 NP‑040192 approved N1 N1-34 N1‑041095 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0644 - B Rel-6 6.2.0 - Session initiation without preconditions - - - N1 N1-34 N1‑040873 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0644 1 B Rel-6 6.2.0 - Session initiation without preconditions - - - N1 N1-34 N1‑041035 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0644 2 B Rel-6 6.2.0 - Session initiation without preconditions - - - N1 N1-34 N1‑041069 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0644 3 B Rel-6 6.2.0 6.3.0 Session initiation without preconditions NP-24 NP‑040193 approved N1 N1-34 N1‑041096 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0645 - B Rel-6 6.2.0 - IMS Conferencing: Inclusion of Profile Tables to TS 24.229 - - - N1 N1-34 N1‑040876 revised 2004‑05‑18 IMS2 - 2004‑05‑26
0645 1 B Rel-6 6.2.0 6.3.0 IMS Conferencing: Inclusion of Profile Tables to TS 24.229 NP-24 NP‑040192 approved N1 N1-34 N1‑041015 agreed 2004‑05‑18 IMS2 - 2004‑06‑03
0647 - F Rel-5 5.8.0 - Correction of reception of media authorization token - - - N1 N1-34 N1‑040921 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0647 1 F Rel-5 5.8.0 5.9.0 Correction of reception of media authorization token NP-24 NP‑040189 approved N1 N1-34 N1‑040993 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0648 - F Rel-5 5.8.0 - Revisions due to published version of draft-ietf-sipping-reg-event - - - N1 N1-34 N1‑040936 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0648 1 F Rel-5 5.8.0 5.9.0 Revisions due to published version of draft-ietf-sipping-reg-event NP-24 NP‑040189 approved N1 N1-34 N1‑040991 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0649 - A Rel-6 6.2.0 - Revisions due to published version of draft-ietf-sipping-reg-event - - - N1 N1-34 N1‑040937 revised 2004‑05‑18 IMS-CCR - 2004‑05‑26
0649 1 A Rel-6 6.2.0 6.3.0 Revisions due to published version of draft-ietf-sipping-reg-event NP-24 NP‑040189 approved N1 N1-34 N1‑040992 agreed 2004‑05‑18 IMS-CCR - 2004‑06‑03
0650 - B Rel-6 6.2.0 - Support of draft-ietf-sip-replaces - - - N1 N1-34 N1‑040943 - 2004‑05‑18 IMS2 - 2004‑05‑26
0650 1 B Rel-6 6.3.0 - Support of draft-ietf-sip-replaces - - - N1 N1-34b N1‑041217 postponed 2004‑06‑30 IMS2 - 2004‑09‑08
0650 2 B Rel-6 6.3.0 6.4.0 Support of draft-ietf-sip-replaces NP-25 NP‑040381 approved N1 N1-35 N1‑041391 agreed 2004‑08‑09 IMS2 - 2004‑09‑08
0651 - F Rel-6 6.2.0 - Downloading the user profile based on User-Data-Request-Type - - - N1 N1-34 N1‑040960 - 2004‑05‑18 IMS2 - 2004‑05‑26
0651 1 F Rel-6 6.3.0 - Downloading the user profile based on User-Data-Request-Type - - - N1 N1-34b N1‑041215 withdrawn 2004‑06‑30 IMS2 - 2004‑09‑08
0651 3 F Rel-6 6.4.0 - Downloading the user profile based on User-Data-Request-Type - - - N1 N1-36 N1‑041820 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0651 4 F Rel-6 6.4.0 6.5.0 Downloading the user profile based on User-Data-Request-Type NP-26 NP‑040506 approved N1 N1-36 N1‑042031 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0652 - C Rel-6 6.2.0 6.3.0 Creation of separate event package table for UA role NP-24 NP‑040198 approved N1 N1-34 N1‑041066 agreed 2004‑05‑18 IMS2, PRESNC - 2004‑06‑03
0653 - B Rel-6 6.3.0 - Interworking with Ipv4 networks - - - N1 N1-34b N1‑041162 revised 2004‑06‑30 IMS2 - 2004‑09‑08
0653 1 B Rel-6 6.3.0 - Interworking with Ipv4 networks - - - N1 N1-34b N1‑041251 postponed 2004‑06‑30 IMS2 Revision of N1-041162 2004‑09‑08
0654 - F Rel-6 6.3.0 - Callee capabilities and Registration - - - N1 N1-34b N1‑041184 revised 2004‑06‑30 IMS2 - 2004‑09‑08
0654 1 F Rel-6 6.3.0 - Callee capabilities and Registration - - - N1 N1-34b N1‑041249 revised 2004‑06‑30 IMS2 Revision of N1-041184 2004‑09‑08
0654 2 F Rel-6 6.3.0 - Callee capabilities and Registration - - - N1 N1-34b N1‑041253 revised 2004‑06‑30 IMS2 Revision of N1-041249 2004‑09‑08
0654 3 F Rel-6 6.3.0 - Callee capabilities and Registration - - - N1 N1-34b N1‑041302 revised 2004‑06‑30 IMS2 Revision of N1-041253 2004‑09‑08
0654 4 F Rel-6 6.3.0 6.4.0 Callee capabilities and Registration NP-25 NP‑040381 approved N1 N1-34b N1‑041315 agreed 2004‑06‑30 IMS2 Revision of N1-041302 2004‑09‑08
0655 - B Rel-6 6.3.0 - Support of IPv6 to IPv4 interworking - - - N1 N1-34b N1‑041199 postponed 2004‑06‑30 IMS-CCR - 2004‑09‑08
0656 - B Rel-6 6.3.0 - Support of draft-ietf-sip-referredby - - - N1 N1-34b N1‑041211 revised 2004‑06‑30 IMS2 - 2004‑09‑08
0656 1 B Rel-6 6.3.0 6.4.0 Support of draft-ietf-sip-referredby NP-25 NP‑040381 approved N1 N1-34b N1‑041263 agreed 2004‑06‑30 IMS2 Revision of N1-041211 2004‑09‑08
0657 - B Rel-6 6.3.0 - Support of draft-ietf-sip-join - - - N1 N1-34b N1‑041219 revised 2004‑06‑30 IMS2 - 2004‑09‑08
0657 1 B Rel-6 6.3.0 6.4.0 Support of draft-ietf-sip-join NP-25 NP‑040381 approved N1 N1-34b N1‑041393 agreed 2004‑09‑05 IMS2 - 2004‑09‑08
0658 - F Rel-6 6.3.0 6.4.0 24.229: Correction of User identity verification at the AS NP-25 NP‑040380 approved N1 N1-35 N1‑041344 agreed 2004‑07‑22 PRESNC - 2004‑09‑08
0659 - F Rel-6 6.3.0 6.4.0 Multiple public ID registration NP-25 NP‑040381 approved N1 N1-35 N1‑041350 agreed 2004‑07‑29 IMS2 - 2004‑09‑08
0660 - F Rel-6 6.3.0 6.4.0 Standalone transactions NP-25 NP‑040381 approved N1 N1-35 N1‑041351 agreed 2004‑07‑29 IMS2 - 2004‑09‑08
0661 - F Rel-6 6.3.0 - Call Release - - - N1 N1-35 N1‑041352 revised 2004‑07‑29 IMS2 - 2004‑09‑08
0661 1 F Rel-6 6.3.0 6.4.0 Call Release NP-25 NP‑040381 approved N1 N1-35 N1‑041589 agreed 2004‑09‑05 IMS2 - 2004‑09‑08
0662 - F Rel-6 6.3.0 - Session timer - - - N1 N1-35 N1‑041353 revised 2004‑07‑29 IMS2 - 2004‑09‑08
0662 1 F Rel-6 6.3.0 6.4.0 Session timer NP-25 NP‑040381 approved N1 N1-35 N1‑041590 agreed 2004‑09‑05 IMS2 - 2004‑09‑08
0663 - F Rel-6 6.3.0 6.4.0 Unprotected REGISTER NP-25 NP‑040381 approved N1 N1-35 N1‑041354 agreed 2004‑07‑29 IMS2 - 2004‑09‑08
0664 - F Rel-6 6.3.0 - P-Preferred Identity - - - N1 N1-35 N1‑041355 withdrawn 2004‑07‑29 IMS2 - 2004‑09‑08
0665 - F Rel-6 6.3.0 6.4.0 Contact in SUBSCRIBE request NP-25 NP‑040381 approved N1 N1-35 N1‑041372 agreed 2004‑07‑29 IMS2 - 2004‑09‑08
0666 - F Rel-6 6.3.0 - NOTIFY requests - - - N1 N1-35 N1‑041357 revised 2004‑07‑29 IMS2 - 2004‑09‑08
0666 1 A Rel-6 6.3.0 6.4.0 NOTIFY requests NP-25 NP‑040381 approved N1 N1-35 N1‑041586 agreed 2004‑09‑05 IMS2 - 2004‑09‑08
0667 - F Rel-6 6.3.0 - Select proper UE - - - N1 N1-35 N1‑041358 withdrawn 2004‑07‑29 IMS2 - 2004‑09‑08
0668 - F Rel-6 6.3.0 - Network deregistration - - - N1 N1-35 N1‑041360 revised 2004‑07‑29 IMS2 - 2004‑09‑08
0668 1 F Rel-6 6.3.0 - Network deregistration - - - N1 N1-35 N1‑041360 revised 2004‑09‑05 IMS2 - 2004‑09‑08
0668 1 F Rel-6 6.3.0 - Network deregistration - - - N1 N1-35 N1‑041591 revised 2004‑08‑20 IMS2 - 2004‑09‑08
0668 2 F Rel-6 6.3.0 - Network deregistration - - - N1 N1-35 N1‑041360 revised 2004‑09‑05 IMS2 - 2004‑09‑08
0668 2 F Rel-6 6.3.0 6.4.0 Network deregistration NP-25 NP‑040381 approved N1 N1-35 N1‑041614 agreed 2004‑08‑20 IMS2 - 2004‑09‑08
0669 - F Rel-6 6.3.0 - Interworking with Ipv4 networks - - - N1 N1-35 N1‑041429 postponed 2004‑08‑09 IMS-CCR-IWIP - 2004‑09‑08
0670 - F Rel-6 6.3.0 - Handling of pres and im URIs - - - N1 N1-35 N1‑041430 postponed 2004‑08‑09 IMS2 - 2004‑09‑08
0671 - F Rel-6 6.3.0 - Throttling, Partial publication - - - N1 N1-35 N1‑041431 postponed 2004‑08‑09 IMS2 - 2004‑09‑08
0672 - F Rel-5 5.9.0 - Syntax correction for the P-Charging-Vector header - - - N1 N1-35 N1‑041433 revised 2004‑08‑09 IMS-CCR - 2004‑09‑08
0672 1 F Rel-5 5.9.0 5.10.0 Syntax correction for the P-Charging-Vector header NP-25 NP‑040385 approved N1 N1-35 N1‑041537 agreed 2004‑09‑05 IMS-CCR - 2004‑09‑08
0673 - A Rel-6 6.3.0 6.4.0 Syntax correction for the P-Charging-Vector header NP-25 NP‑040385 approved N1 N1-35 N1‑041434 agreed 2004‑08‑09 IMS-CCR - 2004‑09‑08
0674 - F Rel-5 5.9.0 - Syntax of the P-Charging-Function-Address header - - - N1 N1-35 N1‑041436 revised 2004‑08‑09 IMS-CCR - 2004‑09‑08
0674 1 F Rel-5 5.9.0 - Syntax of the P-Charging-Function-Address header - - - N1 N1-35 N1‑041436 withdrawn 2004‑09‑05 IMS-CCR - 2004‑09‑08
0675 - A Rel-6 6.3.0 - Syntax of the P-Charging-Function-Address header - - - N1 N1-35 N1‑041437 revised 2004‑08‑09 IMS-CCR - 2004‑09‑08
0675 1 A Rel-6 6.3.0 - Syntax of the P-Charging-Function-Address header - - - N1 N1-35 N1‑041437 withdrawn 2004‑09‑05 IMS-CCR - 2004‑09‑08
0676 - F Rel-5 5.9.0 - Handling unattainable mandatory capabilities in I-CSCF - - - N1 N1-35 N1‑041438 withdrawn 2004‑08‑09 IMS-CCR - 2004‑09‑08
0677 - A Rel-6 6.3.0 - Handling unattainable mandatory capabilities in I-CSCF - - - N1 N1-35 N1‑041439 withdrawn 2004‑08‑09 IMS-CCR - 2004‑09‑08
0678 - D Rel-6 6.3.0 6.4.0 Support of TLS NP-25 NP‑040381 approved N1 N1-35 N1‑041462 agreed 2004‑08‑09 IMS2 - 2004‑09‑08
0679 - F Rel-5 5.9.0 - Missing value for the event attribute within the element of NOTIFY body - - - N1 N1-35 N1‑041467 revised 2004‑08‑09 IMS-CCR - 2004‑09‑08
0679 1 F Rel-5 5.9.0 5.10.0 Missing value for the event attribute within the element of NOTIFY body NP-25 NP‑040385 approved N1 N1-35 N1‑041541 agreed 2004‑08‑26 IMS-CCR - 2004‑09‑08
0680 - F Rel-5 5.9.0 - HSS initiated deregistration - - - N1 N1-35 N1‑041468 withdrawn 2004‑08‑09 IMS-CCR replaced by cr 698 2004‑09‑08
0681 - F Rel-5 5.9.0 - Network initiated deregistration upon UE roaming and registration to a new network - - - N1 N1-35 N1‑041469 revised 2004‑08‑09 IMS-CCR - 2004‑09‑08
0681 1 F Rel-5 5.9.0 - Network initiated deregistration upon UE roaming and registration to a new network - - - N1 N1-35 N1‑041550 revised 2004‑09‑04 IMS-CCR - 2004‑09‑08
0681 2 F Rel-5 5.9.0 5.10.0 Network initiated deregistration upon UE roaming and registration to a new network NP-25 NP‑040385 approved N1 N1-35 N1‑041628 agreed 2004‑09‑04 IMS-CCR - 2004‑09‑08
0682 - F Rel-6 6.3.0 - SDP parameters received by the S-CSCF and the P-CSCF in the 200 OK message - - - N1 N1-35 N1‑041470 revised 2004‑08‑09 IMS-CCR - 2004‑09‑08
0682 1 F Rel-6 6.3.0 6.4.0 SDP parameters received by the S-CSCF and the P-CSCF in the 200 OK message NP-25 NP‑040381 approved N1 N1-35 N1‑041592 agreed 2004‑09‑05 IMS-CCR - 2004‑09‑08
0683 - C Rel-6 6.3.0 - Adding of the P-Visited-Network-ID header by the P-CSCF along the signalling path - - - N1 N1-35 N1‑041471 postponed 2004‑08‑09 IMS interoperability - 2004‑09‑08
0684 - C Rel-6 6.3.0 - Population of the P-Access-Network-Info header by the P-CSCF if not received from the UE. Addition of table in annexe A for referencing different IP-CANs - - - N1 N1-35 N1‑041472 revised 2004‑08‑09 IMS Interoperability - 2004‑09‑08
0684 1 C Rel-6 6.3.0 - Population of the P-Access-Network-Info header by the P-CSCF if not received from the UE. Addition of table in annexe A for referencing different IP-CANs - - - N1 N1-35 N1‑041609 postponed 2004‑09‑05 IMS Interoperability - 2004‑09‑08
0685 - C Rel-6 6.3.0 - Filtering of the P-Visited-Network-ID header by the S-CSCF and privacy statement - - - N1 N1-35 N1‑041473 withdrawn 2004‑08‑09 IMS interoperability - 2004‑09‑08
0686 - C Rel-6 6.3.0 - Optionnality of SigComp depending on the type of access network - - - N1 N1-35 N1‑041474 postponed 2004‑08‑09 IMS interoperability - 2004‑09‑08
0687 - D Rel-6 6.3.0 - Access independence and SIP timers - - - N1 N1-35 N1‑041475 postponed 2004‑08‑09 IMS interoperability - 2004‑09‑08
0688 - C Rel-6 6.3.0 - Filtering of the P-Access-Network-Info header by the S-CSCF and privacy rules - - - N1 N1-35 N1‑041476 revised 2004‑08‑09 IMS2 - 2004‑09‑08
0688 1 C Rel-6 6.3.0 - Filtering of the P-Access-Network-Info header by the S-CSCF and privacy rules - - - N1 N1-35 N1‑041610 revised 2004‑09‑04 IMS2 - 2004‑09‑08
0688 2 C Rel-6 6.3.0 6.4.0 Filtering of the P-Access-Network-Info header by the S-CSCF and privacy rules NP-25 NP‑040381 approved N1 N1-35 N1‑041641 agreed 2004‑09‑04 IMS2 - 2004‑09‑08
0689 - B Rel-6 6.3.0 - Non precondition session set-up -Terminating session - - - N1 N1-35 N1‑041483 revised 2004‑08‑09 Additional SIP capabilities - 2004‑09‑08
0689 1 B Rel-6 6.3.0 - Non precondition session set-up -Terminating session - - - N1 N1-35 N1‑041593 revised 2004‑09‑04 IMS2 Additional SIP capabilities - 2004‑09‑08
0689 2 B Rel-6 6.3.0 6.4.0 Non precondition session set-up -Terminating session NP-25 NP‑040383 approved N1 N1-35 N1‑041632 agreed 2004‑09‑04 IMS2 Additional SIP capabilities - 2004‑09‑08
0690 - - Rel-6 6.3.0 - Non precondition session set-up -Originating session - - - N1 N1-35 N1‑041484 rejected 2004‑08‑09 Additional SIP capabilities - 2004‑09‑08
0691 - - Rel-6 6.3.0 - Non precondition session set-up -SDP section changes - - - N1 N1-35 N1‑041485 rejected 2004‑08‑09 Additional SIP capabilities - 2004‑09‑08
0692 - B Rel-6 6.3.0 - Ipv6 IP v4 interworking - - - N1 N1-35 N1‑041488 revised 2004‑08‑09 IMS2 - 2004‑09‑08
0692 1 B Rel-6 6.3.0 - Ipv6 IP v4 interworking - - - N1 N1-35 N1‑041564 revised 2004‑09‑04 IMS2 - 2004‑09‑08
0692 1 B Rel-6 6.3.0 6.4.0 Ipv6 IP v4 interworking NP-25 NP‑040382 approved N1 N1-35 N1‑041630 agreed 2004‑09‑04 IMS2 - 2004‑09‑08
0693 - F Rel-5 5.9.0 - Network initiated deregistration at unregistered state - - - N1 N1-35 N1‑041489 withdrawn 2004‑08‑09 IMS-CCR - 2004‑09‑08
0694 - F Rel-5 5.9.0 - Correction to condition for removal of the P- Access- Network-Info Header - - - N1 N1-35 N1‑041491 revised 2004‑08‑10 IMS-CCR - 2004‑09‑08
0694 1 F Rel-5 5.9.0 5.10.0 Correction to condition for removal of the P- Access- Network-Info Header NP-25 NP‑040385 approved N1 N1-35 N1‑041552 agreed 2004‑09‑04 IMS-CCR - 2004‑09‑08
0695 - A Rel-6 6.3.0 - Correction to condition for removal of the P- Access- Network-Info Header - - - N1 N1-35 N1‑041492 revised 2004‑08‑10 IMS-CCR - 2004‑09‑08
0695 1 A Rel-6 6.3.0 - Correction to condition for removal of the P- Access- Network-Info Header - - - N1 N1-35 N1‑041553 rejected 2004‑09‑04 IMS-CCR - 2004‑09‑08
0696 - C Rel-6 6.3.0 - Use of Service Key - - - N1 N1-35 N1‑041504 withdrawn 2004‑08‑10 IMS2 - 2004‑09‑08
0697 - A Rel-6 6.3.0 6.4.0 Missing value for the event attribute within the element of NOTIFY body NP-25 NP‑040385 approved N1 N1-35 N1‑041540 agreed 2004‑08‑10 IMS-CCR - 2004‑09‑08
0698 - F Rel-6 6.3.0 6.4.0 HSS initiated deregistration NP-25 NP‑040385 approved N1 N1-35 N1‑041549 agreed 2004‑08‑10 IMS-CCR - 2004‑09‑08
0699 - F Rel-6 6.3.0 - Network initiated deregistration upon UE roaming and registration to a new network - - - N1 N1-35 N1‑041551 revised 2004‑08‑10 IMS-CCR - 2004‑09‑08
0699 1 F Rel-6 6.3.0 6.4.0 Network initiated deregistration upon UE roaming and registration to a new network NP-25 NP‑040385 approved N1 N1-35 N1‑041629 agreed 2004‑09‑04 IMS-CCR - 2004‑09‑08
0700 - F Rel-5 5.9.0 - Network deregistration - - - N1 N1-35 N1‑041631 withdrawn 2004‑08‑10 IMS2 Rel-5 CR related to N1-041614 2004‑09‑08
0701 - F Rel-5 5.9.0 5.10.0 NOTIFY requests NP-25 NP‑040381 approved N1 N1-35 N1‑041639 agreed 2004‑08‑10 IMS2 - 2004‑09‑08
0702 - D Rel-6 6.4.0 - Rework of Session Initiation Clauses - - - N1 N1-36 N1‑041703 postponed 2004‑12‑08 IMS2 not avialable in CN1-36 meeting 2004‑12‑09
0703 - F Rel-6 6.4.0 - SDP Encryption - - - N1 N1-36 N1‑041719 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0703 1 F Rel-6 6.4.0 - SDP Encryption - - - N1 N1-36 N1‑042018 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0703 2 F Rel-6 6.4.0 6.5.0 SDP Encryption NP-26 NP‑040506 approved N1 N1-36 N1‑042095 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0704 - F Rel-6 6.4.0 - RTCP streams - - - N1 N1-36 N1‑041720 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0704 1 F Rel-6 6.4.0 6.5.0 RTCP streams NP-26 NP‑040506 approved N1 N1-36 N1‑042019 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0705 - F Rel-6 6.4.0 - Route header update - - - N1 N1-36 N1‑041721 rejected 2004‑12‑08 IMS2 - 2004‑12‑09
0706 - F Rel-5 5.10.0 - Route header update - - - N1 N1-36 N1‑041722 rejected 2004‑12‑08 IMS2 - 2004‑12‑09
0707 - F Rel-6 6.4.0 - Routing requests to IMS-ALG - - - N1 N1-36 N1‑041723 rejected 2004‑12‑08 IMS2 - 2004‑12‑09
0708 - F Rel-6 6.4.0 - MT Calls from IPv4 SIP terminals - - - N1 N1-36 N1‑041724 rejected 2004‑12‑08 IMS2 - 2004‑12‑09
0709 - F Rel-6 6.4.0 6.5.0 Contact in 200(OK) response NP-26 NP‑040506 approved N1 N1-36 N1‑041725 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0710 - F Rel-6 6.4.0 - P-Access-Network-Info header - - - N1 N1-36 N1‑041726 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0710 1 F Rel-6 6.4.0 6.5.0 P-Access-Network-Info header NP-26 NP‑040506 approved N1 N1-36 N1‑042020 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0711 - F Rel-6 6.4.0 - P-Called-Party-ID header - - - N1 N1-36 N1‑041727 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0711 1 F Rel-6 6.4.0 6.5.0 P-Called-Party-ID header NP-26 NP‑040506 approved N1 N1-36 N1‑041954 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0712 - F Rel-5 5.10.0 - P-Called-Party-ID header - - - N1 N1-36 N1‑041728 rejected 2004‑12‑08 IMS2 - 2004‑12‑09
0713 - F Rel-6 6.4.0 - IMS-ALG routing - - - N1 N1-36 N1‑041729 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0713 1 F Rel-6 6.4.0 6.5.0 IMS-ALG routing NP-26 NP‑040506 approved N1 N1-36 N1‑042021 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0714 - F Rel-6 6.4.0 - Public User Identity - - - N1 N1-36 N1‑041730 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0714 1 F Rel-6 6.4.0 6.5.0 Public User Identity NP-26 NP‑040506 approved N1 N1-36 N1‑042022 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0715 - F Rel-6 6.4.0 - Pres and im URIs - - - N1 N1-36 N1‑041731 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0715 1 F Rel-6 6.4.0 6.5.0 Pres and im URIs NP-26 NP‑040506 approved N1 N1-36  N1‑042023 agreed 2004‑12‑08 IMS2 - 2004‑12‑09
0716 - F Rel-5 5.10.0 - Inclusion of Security-Verify header in subsequent requests - - - N1 N1-36 N1‑041704 postponed 2004‑12‑08 IMS2 not handled 2004‑12‑09
0717 - A Rel-6 6.4.0 - Inclusion of Security-Verify header in subsequent requests - - - N1 N1-36 N1‑041705 revised 2004‑12‑08 IMS2 - 2004‑12‑09
0717 1 A Rel-6 6.4.0 - Inclusion of Security-Verify header in subsequent requests - - - N1 N1-36 N1‑041952 postponed 2004‑12‑08 IMS2 not available in CN1-36 meeting 2004‑12‑09
0718 - F Rel-5 5.10.0 - Indication of multiple security algorithms - - - N1 N1-36 N1‑041706 postponed 2004‑12‑08 IMS2 not handled 2004‑12‑09
0719 - A Rel-6 6.4.0 - Indication of multiple security algorithms - - - N1 N1-36 N1‑041707 postponed 2004‑12‑08 IMS2 not handled 2004‑12‑09
0720 - C Rel-6 6.4.0 - Optionnality of SigComp depending on the type of access network - - - N1 N1-36 N1‑041758 postponed 2004‑12‑08 IMS2 - 2004‑12‑09
0721 - D Rel-6 6.4.0 - Access independence and SIP timers between UE and the P-CSCF - - - N1 N1-36 N1‑041759 postponed 2004‑12‑08 IMS2 - 2004‑12‑09
0722 - F Rel-5 5.10.0 - Correction Term IOI handling - - - N1 N1-36 N1‑041775 revised 2004‑12‑08 IMS-CCR - 2004‑12‑09
0722 1 F Rel-5 5.10.0 5.11.0 Correction Term IOI handling NP-26 NP‑040502 approved N1 N1-36 N1‑041955 agreed 2004‑12‑08 IMS-CCR - 2004‑12‑09
0723 - A Rel-6 6.4.0 - Correction Term IOI handling - - - N1 N1-36 N1‑041776 revised 2004‑12‑08 IMS-CCR - 2004‑12‑09
0723 1 A Rel-6 6.4.0 6.5.0 Correction Term IOI handling NP-26 NP‑040502 approved N1 N1-36 N1‑041956 agreed 2004‑12‑08 IMS-CCR - 2004‑12‑09
0724 - F Rel-5 5.10.0 - Request handling in S-CSCF originating case - - - N1 N1-36 N1‑041777 revised 2004‑12‑08 IMS-CCR - 2004‑12‑09
0724 1 F Rel-5 5.10.0 5.11.0 Request handling in S-CSCF originating case NP-26 NP‑040502 approved N1 N1-36 N1‑041957 agreed 2004‑12‑08 IMS-CCR - 2004‑12‑09
0725 - A Rel-6 6.4.0 - Request handling in S-CSCF originating case - - - N1 N1-36 N1‑041778 revised 2004‑12‑08 IMS-C