3GPP TDocs (written contributions) at meeting
Meeting: S5-65 - 2009-05-11 to 2009-05-15, Tallinn
meeting id: S5-65 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S5‑092200 | Agenda | WG Chairman | imported from 3GU |
S5‑092201 | Report from last SA5 meeting | MCC | imported from 3GU |
S5‑092202 | SA5 status report at the last SA meeting | MCC | imported from 3GU |
S5‑092203 | OAM Time Plan | WG Chairman | imported from 3GU |
S5‑092204 | OAM Detailed Report from LAST Meeting | OAM Chairman | imported from 3GU |
S5‑092205 | OAM Executive Report from THIS Meeting | OAM SWG Chair | imported from 3GU |
S5‑092206 | OAM Detailed Report from THIS Meeting | OAM SWG Chair | imported from 3GU |
S5‑092207 | CH Agenda and Time Plan | CH SWG Chair | imported from 3GU |
S5‑092208 | CH List of Documents | CH SWG Chair | imported from 3GU |
S5‑092209 | CH Detailed Report from LAST Meeting | CH SWG Chair | imported from 3GU |
S5‑092210 | CH Executive Report from THIS Meeting | CH SWG Chair | imported from 3GU |
S5‑092211 | CHG Detailed Report from THIS Meeting | CHG Chairman | imported from 3GU |
S5‑092212 | SA5 Meeting Calendar | WG Chairman | imported from 3GU |
S5‑092213 | SA5 Working Procedures | WG Chairman | imported from 3GU |
S5‑092214 | SA5 Meeting Facility Requirements | WG Chairman | imported from 3GU |
S5‑092215 | Draft TS/TR Management Process | WG Vice Chair | imported from 3GU |
S5‑092216 | TR 30.818 Project scheduling for SA5 Release 8 | MCC | imported from 3GU |
S5‑092217 | TR 30.819 Project scheduling for SA5 Release 9 | MCC | imported from 3GU |
S5‑092218 | Deliverables due for the NEXT SA Plenary | MCC | imported from 3GU |
S5‑092219 | SA5 3GPP Work Plan | MCC | imported from 3GU |
S5‑092220 | Rel-8 Missing Specifications | WG Chairman | imported from 3GU |
S5‑092221 | draft LS_out from SA5 to CT4 on Rel-9 AVP code range allocation | Nokia Siemens Networks | imported from 3GU |
S5‑092222 | R8 CR 32.251 Correction on EPC Charging | Nokia Siemens Networks | imported from 3GU |
S5‑092223 | R8 CR 32.298 Correction on EPC Charging | Nokia Siemens Networks | imported from 3GU |
S5‑092224 | R8 CR 32.299 Correction on EPC Charging | Nokia Siemens Networks | imported from 3GU |
S5‑092225 | LS on Updates to Recommendation M.3020 | ITU-T SG2 | imported from 3GU |
S5‑092226 | 32.581 Rel8 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092227 | 32.582 Rel8 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092228 | 32.583 Rel8 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092229 | pCR 32.584 Rel8 Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092230 | 32.581 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092231 | 32.582 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092232 | 32.583 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092233 | pCR 32.584 Rel9 PCR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092234 | pCR 32.584 CM File Format | IP.Access, Vodafone, AT&T | imported from 3GU |
S5‑092235 | LS from TISPAN WG2 on IPTV related charging | 20bTD337 | imported from 3GU |
S5‑092236 | LS reply from ITU-T SG2 on ETSI TISPAN WG8 on Service Activation of NMS-EMS Interface | COM 2-LS 28 | imported from 3GU |
S5‑092237 | LS reply from SA2 on UDC | S2-093012 | imported from 3GU |
S5‑092238 | pCR Correction on message flows for Rc reference point | Nokia Siemens Networks | imported from 3GU |
S5‑092239 | E TD SOA for IRP (MRM and SOA) | Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
S5‑092240 | E TD d32xx1 H(e)NB OAM&P concepts and req (for interface Type 2) skeleton | Ericsson | imported from 3GU |
S5‑092241 | E pCR d32xx1 h(e)NB OAM&P concepts and req | Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
S5‑092242 | R8 CR 32.299 Correction on Refund Information | Nokia Siemens Networks | imported from 3GU |
S5‑092243 | Comparison of Information Service Technologies for Management Interface between DMS and UE | Qualcomm | imported from 3GU |
S5‑092244 | TR 32.821 v2.0.0 Telecommunication management; Study of Self-Organizing Networks (SON) related OAM Interfaces for Home Node B (HNB) - for SA Approval | Huawei | imported from 3GU |
S5‑092245 | Presentation sheet for submission of TR 32.821 for SA approval | Huawei | imported from 3GU |
S5‑092246 | E CR R8 32.111-7 Correction of Mapping Table | Ericsson | imported from 3GU |
S5‑092247 | LS from ETSI TISPAN WG8 on Subscription Management Information Model | 20PTD057r1 | imported from 3GU |
S5‑092248 | LS from Broadband Forum on use of TR-069 for HNB Management & Northbound Interface | bbf2009.250.01 | imported from 3GU |
S5‑092249 | CR Add MMEGI to E-UTRAN NRM for Pool Management purposes (CR to 32.762) | Nokia Siemens Network | imported from 3GU |
S5‑092250 | SA5 Timed out specs | MCC | imported from 3GU |
S5‑092251 | CR Add MMEGI to E-UTRAN NRM for Pool Management purposes CORBA SS | Nokia Siemens Network | imported from 3GU |
S5‑092252 | CR Add MMEGI to E-UTRAN NRM for Pool Management purposes XML definition | Nokia Siemens Network | imported from 3GU |
S5‑092253 | CR Correcting Trace Activation/deactivation flow in EPS for PMIP based S5 interface | Nokia Siemens Network | imported from 3GU |
S5‑092254 | Accompanying document to CRs on add “MME GI” in E-UTRAN NRM (MME Pool Management) | Nokia Siemens Network | imported from 3GU |
S5‑092255 | User Data Convergence: Background information | Ericsson | imported from 3GU |
S5‑092256 | New WID on User Data Convergence - Common Baseline Information Model | Ericsson, CMCC | imported from 3GU |
S5‑092257 | UDC IM TS skeleton | Ericsson | imported from 3GU |
S5‑092258 | pCR UDC IM Introduction and scope | Ericsson | imported from 3GU |
S5‑092259 | Correcting Trace Activation/deactivation flow in EPS for PMIP based S5 interface | Nokia Siemens Network | - |
S5‑092260 | pCR Update 3G Home NodeB Gateway NRM Class Diagram | China Mobile | imported from 3GU |
S5‑092261 | pCR Add 3G Home NodeB Gateway OAM&P NRM IuhSignLinkTp Definition | China Mobile | imported from 3GU |
S5‑092262 | pCR Add 3G Home NodeB Gateway NRM EP_Iuh Definition | China Mobile | imported from 3GU |
S5‑092263 | pCR Add 3G Home NodeB Gateway NRM IOC HnbGwFunction attributes | China Mobile | imported from 3GU |
S5‑092264 | Rel-9 CR 32.151 Introduce Information Type in IS template | Ericsson | imported from 3GU |
S5‑092265 | E pCR d32xx1 H(e)NB OAM&P concepts and req - re Requirements | Ericsson | imported from 3GU |
S5‑092266 | E TD Two Ways to capture (in IRP specifications) definitions of IOCs related to management of HNB, HNB-GW, HeNB and HeNB-GW | China Mobile, Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
S5‑092267 | CR Add 3G Home NodeB Gateway Core Network Resources IRP-Common Object Request Broker Architecture (CORBA) Solution Set(SS) | China Mobile | imported from 3GU |
S5‑092268 | CR R8 32.753 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | imported from 3GU |
S5‑092269 | CR R8 32.755 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | imported from 3GU |
S5‑092270 | CR R8 32.753 Add ExternalSGWFunction IOC and attrbutes for SGWFunction | Motorola | imported from 3GU |
S5‑092271 | CR R8 32.755 Add ExternalSGWFunction IOC and attrbutes for SGWFunction | Motorola | imported from 3GU |
S5‑092272 | CR R8 32.763 Add downlink power related attributes | Motorola | imported from 3GU |
S5‑092273 | CR R8 32.763 Add downlink power related attributes | Motorola | imported from 3GU |
S5‑092274 | CR R8 32.765 Add downlink power related attributes | Motorola | imported from 3GU |
S5‑092275 | CR R8 32.762 Add cell-size attribute in EUTRANGenericCell | Motorola | imported from 3GU |
S5‑092276 | CR R8 32.763 Add cell-size attribute in EUTRANGenericCell | Motorola | imported from 3GU |
S5‑092277 | CR R8 32.765 Add cell-size attribute in EUTRANGenericCell | Motorola | imported from 3GU |
S5‑092278 | CR R9 32.752 Add QCI model | Motorola | imported from 3GU |
S5‑092279 | CR R8 32.422 Encoding of Trace depth | Motorola | imported from 3GU |
S5‑092280 | Discussion paper on decryption of NAS messages traced by E-UTRAN | Motorola | imported from 3GU |
S5‑092281 | CR R9 32.422 Add indicator for providing security parameters for cell traffic trace record | Motorola | imported from 3GU |
S5‑092282 | CR R9 32.423 CR Including security parameters in Trace record for decrypting the NAS messages traced by E-UTRAN | Motorola | imported from 3GU |
S5‑092283 | E CR 32.762 Remove tCI from EUtranRelation | Ericsson | imported from 3GU |
S5‑092284 | R9 CR 32299 MMTel-CCBS&CCNR | ZTE | imported from 3GU |
S5‑092285 | R9 CR 32298 MMTel-CCBS&CCNR | ZTE | imported from 3GU |
S5‑092286 | R9 CR 32273 add message flow for UTRAN access in eMBMS charging | ZTE | imported from 3GU |
S5‑092287 | R9 CR 32251 MBMS charging in EPS alignment in MBMS context bearer charging data aspect | ZTE | imported from 3GU |
S5‑092288 | pCR Add message flow for performing debit in TR32.285 | ZTE | imported from 3GU |
S5‑092289 | Parameters Subject to Dynamic Radio Configuration Function | Nokia Siemens Networks | imported from 3GU |
S5‑092290 | Self Healing Requirements | Nokia Siemens Networks | imported from 3GU |
S5‑092291 | E Trace Management IRP SOAP SS Skeleton | Ericsson | imported from 3GU |
S5‑092292 | E pCR 32.447 Trace Management SOAP SS | Ericsson | imported from 3GU |
S5‑092293 | New WID on IWLAN mobility charging | Orange | imported from 3GU |
S5‑092294 | R9 CR32260 Add field in CDR contents | Orange, Ericsson | imported from 3GU |
S5‑092295 | R9 CR32298 CDR parameter for RTTI in IMS offline charging | Orange, Ericsson | imported from 3GU |
S5‑092296 | R9 CR32298 AVP for RTTI in IMS offline charging | Orange, Ericsson | imported from 3GU |
S5‑092297 | New WID for SuM evolution | Ericsson, Verizon Wireless, Alcatel-Lucent | imported from 3GU |
S5‑092298 | SuM IM related use cases | Ericsson | imported from 3GU |
S5‑092299 | Putting SuM into context | Ericsson | imported from 3GU |
S5‑092300 | New SuM model requirements | Ericsson | imported from 3GU |
S5‑092301 | CR R9 32.152 Introduction of additional basic model elements | Ericsson | imported from 3GU |
S5‑092302 | CR 32.532 Add start step parameter for resume Operation | Huawei, Nokia Siemens Networks | imported from 3GU |
S5‑092303 | - | - | imported from 3GU |
S5‑092304 | Rel-9 CR 32.762 Add ICIC mgmt attribute in EUtranRelation | Huawei | imported from 3GU |
S5‑092305 | CR R9 32.763 Add ICIC mgmt attribute in EUtranRelation | Huawei | imported from 3GU |
S5‑092306 | CR R9 32.765 Add ICIC mgmt attribute in EUtranRelation | Huawei | imported from 3GU |
S5‑092307 | CR 32.532 NASWM IS – downloadNeSw Operation | Huawei, Vodafone | imported from 3GU |
S5‑092308 | CR 32.532 NASWM IS – installNeSw Operation | Huawei, Vodafone | imported from 3GU |
S5‑092309 | CR 32.532 NASWM IS – activateNeSw Operation | Huawei, Vodafone | imported from 3GU |
S5‑092310 | CR 32.532 NASWM IS – NASWM Notification notifyNASWMStatusChanged | Huawei, Vodafone | imported from 3GU |
S5‑092311 | CR 32.533 NASWM Corba SS – NASWM Definitions for Operations and Notification | Huawei | imported from 3GU |
S5‑092312 | CR 32.533 NASWM Corba SS – downloadNeSw Operation | Huawei | imported from 3GU |
S5‑092313 | CR 32.533 NASWM Corba SS – installNeSw Operation | Huawei | imported from 3GU |
S5‑092314 | CR 32.533 NASWM Corba SS – activateNeSw Operation | Huawei | imported from 3GU |
S5‑092315 | CR 32.533 NASWM Corba SS – NASWM Notification notifyNASWMStatusChanged | Huawei | imported from 3GU |
S5‑092316 | CR 32.531 Definitions for NASWM activities | Huawei | imported from 3GU |
S5‑092317 | pCR Add CM Requirements to Home eNodeB OAM&P type 1 interface | Huawei, Alcatel-Lucent | imported from 3GU |
S5‑092318 | pCR Add FM Requirements to Home eNodeB OAM&P type 1 interface | Huawei, Alcatel-Lucent | imported from 3GU |
S5‑092319 | pCR Add PM Requirements to Home eNodeB OAM&P type 1 interface | Huawei, Alcatel-Lucent | imported from 3GU |
S5‑092320 | CR E-UTRAN Measurement for paging discards at the eNodeB | Vodafone | imported from 3GU |
S5‑092321 | CR 32.583 Editorial update to HNB CM procedure flow via file download | Huawei | imported from 3GU |
S5‑092322 | pCR Add SM Requirements to Home eNodeB OAM&P type 1 interface | Huawei, Alcatel-Lucent | imported from 3GU |
S5‑092323 | pCR 32.584 XML format definition for CM information model | Huawei | imported from 3GU |
S5‑092324 | pCR 32.521 Add Business Level Requirements For Self-Optimization Management | Huawei, Vodafone | imported from 3GU |
S5‑092325 | pCR Add Specification Level Requirements For Self-Optimization Management | Huawei, Vodafone | imported from 3GU |
S5‑092326 | Modify Business Level Requirements For Self-Optimization Management | Huawei | imported from 3GU |
S5‑092327 | pCR 32.521 Use Case And Requirements For Load Balancing Management | Huawei | imported from 3GU |
S5‑092328 | Updates for Abbreviations section for Rc reference point | Openet | imported from 3GU |
S5‑092329 | Updates to definitions for Rc reference | Openet | imported from 3GU |
S5‑092330 | draft TS 32.593 Proposal for Skeleton - Procedure Flows for Type 1 Interface HeNB to HeNB Management System | Qualcomm | imported from 3GU |
S5‑092331 | Proposal for Skeleton for TS 32.592 Information Model for Type 1 Interface HeNB to HeNB Management System | Alcatel-Lucent | imported from 3GU |
S5‑092332 | Proposed way forward for HNB/HeNB Type 1 interface for 3GPP R9 and beyond | Alcatel-Lucent, Vodafone, Thomson, CMCC, Orange, Verizon Wireless, AT&T, T-Mobile, SFR | imported from 3GU |
S5‑092333 | FM Information Model for Home eNodeB OAM&P type 1 interface | Alcatel-Lucent | imported from 3GU |
S5‑092334 | PM Information Model for Home eNodeB OAM&P type 1 interface | Alcatel-Lucent | imported from 3GU |
S5‑092335 | Rel-9 CR 32.581 Add requirement for HMS’s performing frequency configuration to HNB | China Mobile | imported from 3GU |
S5‑092336 | CR CMCC addition of use case of inter RAT relocation related measurements | China Mobile | imported from 3GU |
S5‑092337 | CR CMCC addition of inter RAT relocation related measurements | China Mobile | imported from 3GU |
S5‑092338 | CR CMCC addition of use case of incoming handover related measurements | China Mobile | imported from 3GU |
S5‑092339 | CR CMCC addition of incoming handover related measurements | China Mobile | imported from 3GU |
S5‑092340 | CR CMCC addition of SGi related measurements | China Mobile | imported from 3GU |
S5‑092341 | CR CMCC addition of MME processor usage related measurements | China Mobile | imported from 3GU |
S5‑092342 | CR CMCC addition of eNodeB processor usage related measurements | China Mobile | imported from 3GU |
S5‑092343 | CR CMCC addition of IP dalay for S5S8 and S1 related measurements | China Mobile | imported from 3GU |
S5‑092344 | CR CMCC addition of IP dalay variation for S5S8 and S1 related measurements | China Mobile | imported from 3GU |
S5‑092345 | New CMCC WID on measurement report analysis | China Mobile | imported from 3GU |
S5‑092346 | E CR 32.763 Remove tCI from EUtranRelation | Ericsson | imported from 3GU |
S5‑092347 | E CR 32.765 Remove tCI from EUtranRelation | Ericsson | imported from 3GU |
S5‑092348 | CR R8 32.275 Clarification on MMTel charging architecture | Alcatel-Lucent | imported from 3GU |
S5‑092349 | Discussion on Supplementary services Fields setting for offline charging | Alcatel-Lucent | imported from 3GU |
S5‑092350 | CR R8 32.275 Supplementary services fields setting for offline charging | Alcatel-Lucent | imported from 3GU |
S5‑092351 | CR R9 32.275 Add CCBS CCNR in scope chapter | Alcatel-Lucent | imported from 3GU |
S5‑092352 | CR R9 32.275 Add MCID charging | Alcatel-Lucent | imported from 3GU |
S5‑092353 | CR R9 32.275 Add CUG offline charging | Alcatel-Lucent | imported from 3GU |
S5‑092354 | CR R9 32.275 Add CAT offline charging | Alcatel-Lucent | imported from 3GU |
S5‑092355 | CR R9 32.275 Add FA online charging | Alcatel-Lucent | imported from 3GU |
S5‑092356 | CR R9 32.275 Add CUG online charging | Alcatel-Lucent | imported from 3GU |
S5‑092357 | CR R8 32.299 Complete LCS-information AVP description | Alcatel-Lucent | imported from 3GU |
S5‑092358 | CR R9 32.299 add MCID suplementary service | Alcatel-Lucent | imported from 3GU |
S5‑092359 | CR R9 32.298 Add MCID supplementary service | Alcatel-Lucent | imported from 3GU |
S5‑092360 | CR R9 32.299 Add CAT supplementary service | Alcatel-Lucent | imported from 3GU |
S5‑092361 | CR R9 32.298 Add CAT supplementary service | Alcatel-Lucent | imported from 3GU |
S5‑092362 | CR R8 32.251 Clarification on IP-CAN bearer offline charging | Alcatel-Lucent | imported from 3GU |
S5‑092363 | CR R8 32.251 Clarify the SGSN Charging description applies to SGSN with Gn/Gp connectivity | Alcatel-Lucent | imported from 3GU |
S5‑092364 | CR R8 32.251 Alignment between PS-information used for offline charging and SGW / PGW CDRs | Alcatel-Lucent | imported from 3GU |
S5‑092365 | CR R8 32.299 PS-information AVP description alignement with 32.251 definition | Alcatel-Lucent | imported from 3GU |
S5‑092366 | CR R8 32.298 SGW and PGW CDRs description alignement with TS 32.251 | Alcatel-Lucent | imported from 3GU |
S5‑092367 | CR R8 32.251“Mobile Node Identifier” used for PMIP S5/S8 and S2a/S2b | Alcatel-Lucent | imported from 3GU |
S5‑092368 | CR R8 32.298 “Mobile Node Identifier” used for PMIP S5/S8 and S2a/S2b in PGW CDR | Alcatel-Lucent | imported from 3GU |
S5‑092369 | CR R8 32.299 3GPP2 User location introduction in “service data container” | Alcatel-Lucent | imported from 3GU |
S5‑092370 | CR R8 32.251 Add charging description for S2a/S2b and PMIP based S5/S8 | Alcatel-Lucent | imported from 3GU |
S5‑092371 | CR R8 32.299 Add description for PMIP based interfaces for EPC parameters | Alcatel-Lucent | - |
S5‑092372 | CR R8 32.298 Add description for PMIP based interfaces for EPC parameters | Alcatel-Lucent | imported from 3GU |
S5‑092373 | Changes to and Benefits of Use of UML 2 | Alcatel-Lucent | imported from 3GU |
S5‑092374 | CR 32251 Rel-8 Clarify IP-CAN bearer definition in PGW-CDR | Huawei | imported from 3GU |
S5‑092375 | pCR Clarification of Rc impact analysis | Huawei | imported from 3GU |
S5‑092376 | Message analysis in Rc reference point | Huawei | imported from 3GU |
S5‑092377 | TR 32822-020 Telecommunication management; Study on System Maintenance over Itf-N | ZTE | imported from 3GU |
S5‑092378 | pCR Add a general SWM requirement | ZTE | imported from 3GU |
S5‑092379 | pCR Add software delete in existing SWM requirements | ZTE | imported from 3GU |
S5‑092380 | pCR 32.541 general description of Self-healing | ZTE | imported from 3GU |
S5‑092381 | pCR 32.541 general Self-healing procedure | ZTE | imported from 3GU |
S5‑092382 | pCR 32.541 High-Level use case | ZTE | imported from 3GU |
S5‑092383 | pCR 32.541 business level requirements | ZTE | imported from 3GU |
S5‑092384 | pCR 32.541 specification level requirements | ZTE | imported from 3GU |
S5‑092385 | pCR 32.823 Add Self-healing use case | ZTE | imported from 3GU |
S5‑092386 | pCR 32.823 Conclusions and Recommendations | ZTE | imported from 3GU |
S5‑092387 | OCS and PCRF interaction – use cases and solution | Amdocs | imported from 3GU |
S5‑092388 | R9 CR32298 CDR parameter for RTTI in IMS offline charging | Amdocs | imported from 3GU |
S5‑092389 | R9 CR32299 reuse of TariffInformation AVP for RTTI in IMS offline charging | Amdocs | imported from 3GU |
S5‑092390 | Rel-8 CR 32.260 addition of online charging flag | China Mobile | imported from 3GU |
S5‑092391 | Rel-8 CR 32.298 addition of online charging flag | China Mobile | imported from 3GU |
S5‑092392 | Rel-8 CR 32.299 addition of online charging flag | China Mobile | imported from 3GU |
S5‑092393 | Rel-8 CR 32.260 addition of charged party | China Mobile | imported from 3GU |
S5‑092394 | E CR 32.762 IOC Relations and UML updates | Ericsson | imported from 3GU |
S5‑092395 | pCR TR 32.xxx (Study on Energy Savings Management) -Additional information for the rationale | TNO, Vodafone | imported from 3GU |
S5‑092396 | - | - | imported from 3GU |
S5‑092397 | pCR TR 32.xxx (Study on Energy Savings Management) - Use Cases | Vodafone | imported from 3GU |
S5‑092398 | pCR TR 32.xxx Requirements & Logical Architecture | Vodafone | - |
S5‑092399 | pCR TR 32.xxx (Study on Energy Savings Management) - Requirements & Logical Architecture | Vodafone | imported from 3GU |
S5‑092400 | E TD Way forward for design and maintenance for TR 069 based Data Models for H(e)NB mgmt | Ericsson, NEC, Nokia Siemens Networks | imported from 3GU |
S5‑092401 | New WT-level WID on User Data Convergence - Framework (UDC-MFRM) | T-Mobile, Ericsson, China Mobile, ZTE, Vodafone | imported from 3GU |
S5‑092402 | UDC framework standardisation background | T-Mobile, Ericsson, China Mobile, ZTE, Vodafone | imported from 3GU |
S5‑092403 | CR Correct ANR related attribute value to align with 32.511: resolve Note 1 | Nokia Siemens Networks | imported from 3GU |
S5‑092404 | High-level requirements template complete example | Ericsson | imported from 3GU |
S5‑092405 | Simplified requirements template complete example | Ericsson | imported from 3GU |
S5‑092406 | Management of SON Functions R9 & beyond | Nokia Siemens Networks | imported from 3GU |
S5‑092407 | LS reply from CT3 on security aspects of new work item | C3-090778 | imported from 3GU |
S5‑092408 | LS from CT4 on Trace Interface list | C4-091533 | imported from 3GU |
S5‑092409 | CR Correction of Class Diagram in 32.762 | ZTE | imported from 3GU |
S5‑092410 | pCR 32.823 symbols and abbreviations | ZTE | imported from 3GU |
S5‑092411 | CR R8 32.422 Include reference to the notification format for Cell Traffic Trace | Ericsson | imported from 3GU |
S5‑092412 | SGW Trace Record content | Nokia Siemens Network | imported from 3GU |
S5‑092413 | PGW Trace Record content for Gx and S6b interfaces | Nokia Siemens Network | imported from 3GU |
S5‑092414 | Draft TS-TR email approval status post SA5#64 | Vice Chair | imported from 3GU |
S5‑092415 | CR 32.532 Editorial cleanup | Huawei, Nokia Siemens Networks | imported from 3GU |
S5‑092416 | Trace Interface list correction in 32.422 [in response to LS from CT4 (S5-092408)] | Alcatel-Lucent | imported from 3GU |
S5‑092417 | CR 32.533 Add start step parameter for resume Operation (revision of S5-092303) | Huawei, Nokia Siemens Networks | imported from 3GU |
S5‑092418 | CR Counter contribution to S5-092094 CR R8 32.762 power attributes | Ericsson | imported from 3GU |
S5‑092419 | CR R8 32.423-800 NAS signalling messages in MME | Ericsson | imported from 3GU |
S5‑092420 | Modelling techniques supporting SuM | Ericsson | imported from 3GU |
S5‑092421 | TR 32.825 Status Information For SA | Huawei | imported from 3GU |
S5‑092422 | Proposed changes to TR 32.824 | Nokia Siemens Networks | imported from 3GU |
S5‑092423 | SOA and related Web Services Solution Set discussion | Nokia Siemens Networks | imported from 3GU |
S5‑092424 | M CR R8 32.422 Encoding of Trace depth (revision of S5-092279) | Motorola | imported from 3GU |
S5‑092425 | Report of last methodology alignment meeting with ITU-T | Vice Chair | imported from 3GU |
S5‑092426 | New Umbrella BB-level WID for the SA5 work on User Data Convergence (Acronym: UDC-MMAN) | China Mobile, T-Mobile, Ericsson | imported from 3GU |
S5‑092427 | New WT-level WID on User Data Convergence - Common Baseline Information Model | Ericsson, China Mobile, Huawei, HP, ZTE, Alcatel-Lucent, Verizon, Vodafone | revised to S5-092484 |
S5‑092428 | New WID for SuM evolution | Ericsson, Verizon Wireless, Alcatel-Lucent | approved |
S5‑092429 | New CMCC WID on measurement report analysis | China Mobile | approved |
S5‑092430 | CR R8 32.753 Add ExternalSGWFunction IOC and attrbutes for SGWFunction | Motorola | revised to S5-092609 |
S5‑092431 | CR R8 32.755 Add missing ExternalSGWFunction IOC and attrbutes for SGWFunction | Motorola | revised to S5-092610 |
S5‑092432 | CR R8 32.762 Add cell-size attribute in EUTRANGenericCell | Motorola | approved |
S5‑092433 | LS_in from RAN3 to SA5 on Reply on Trace Activation through DOWNLINK NAS Transport (R3-091318 / S5-092078) Rel-8 (Work Item: LTE Interfaces) | R3-091481 | postponed to next meeting |
S5‑092434 | LS_in from SA3 to SA5 (copy CT3) on security aspects of new work item "RTTI support in IMS charging" (S5-091559 / S3-090444) Rel-9 New work item proposal | S3-091056 | noted |
S5‑092435 | CR R9 32.152 Introduction of additional basic model elements | Ericsson | withdrawn |
S5‑092436 | R8 CR 32.532 Add start step parameter for resume Operation | Huawei, Nokia Siemens Networks | approved with S5-092492 |
S5‑092437 | pCR 32.584 CM File Format | IP.Access, Vodafone, AT&T | revised to S5-092449 |
S5‑092438 | LS_in reply from SA1 to SA3 (copy CT6,SA5) on SA3 questions on H(e)NB requirements (S1-01330 = S3-090624) | S1-091160 | noted |
S5‑092439 | Rel-9 CR 32.583 Clarification on HNB CM procedure flow via file download | Huawei | revised to S5-092631 |
S5‑092440 | Rel-9 CR 32.581 Add requirement for HMS’s performing frequency configuration to HNB | China Mobile | revised to S5-092632 |
S5‑092441 | Self Healing Requirements | Nokia Siemens Networks | S5-092441r1 agreed for inclusion in draft TS |
S5‑092442 | pCR 32.521 Add Business Level Requirements For Self-Optimization Management | Huawei, Vodafone, China Mobile, ZTE, Telecom Italia | agreed for inclusion in draft TS |
S5‑092443 | CR 32.532 NASWM IS – downloadNeSw Operation | Huawei, Vodafone | revised to S5-092633 |
S5‑092444 | CR 32.533 NASWM Corba SS – downloadNeSw Operation | Huawei | revised to S5-092634 |
S5‑092445 | TR 32.824 v1.0.0 Telecommunication management; Study on SOA compliant need and additional capabilities for existing/currently planned Interface IRPs - for SA Information + Approval | Ericsson | agreed for SA Approval with SA submission sheet agreed at SA5#64 |
S5‑092446 | pCR Add Specification Level Requirements For Self-Optimization Management | Huawei, Vodafone, China Mobile, ZTE | revised to S5-092654 |
S5‑092447 | pCR 32.823 Add Self-healing use case | ZTE | agreed |
S5‑092448 | SA submission sheet for TR 32.822 (System Maintenance over Itf-N) | ZTE | approved for SA Information with S5-092470 |
S5‑092449 | pCR 32.584 CM File Format | IP.Access, Vodafone, AT&T | revised to S5-092628 |
S5‑092450 | pCR 32.521 Use Case And Requirements For Load Balancing Management | Huawei | S5-092450r1 agreed for inclusion in draft TS |
S5‑092451 | pCR 32.541 general description of Self-healing | ZTE | agreed for inclusion in draft TS |
S5‑092452 | pCR 32.541 general Self-healing procedure | ZTE | agreed for inclusion in draft TS |
S5‑092453 | pCR 32.541 High-Level use case | ZTE | agreed for inclusion in draft TS |
S5‑092454 | Modify Business Level Requirements For Self-Optimization Management | Huawei | for email approval |
S5‑092455 | pCR Add 3G Home NodeB Gateway NRM EP_Iuh Definition | China Mobile | agreed |
S5‑092456 | 32.581 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | revised to S5-092629 |
S5‑092457 | 32.582 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | revised to S5-092646 |
S5‑092458 | 32.583 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | revised to S5-092630 |
S5‑092459 | pCR 32.584 Rel9 PCR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | email approval as isolated pCR |
S5‑092460 | pCR Add 3G Home NodeB Gateway NRM IOC HnbGwFunction attributes | China Mobile | S5-092460r2 agreed with modifications |
S5‑092461 | updated WID approved at SA#42 in SP-080794 (3G HNB GW OAM&P) in line with S5-092071 from SA5#64 | China Mobile | revised to S5-092643 |
S5‑092462 | SA submission sheet for TR 32.823 Telecommunication management; Study on Self-healing of SON (self-optimizing networks) Self-Optimization & Self-Healing OAM Requirements | ZTE | for email approval for SA Information with S5-092463 |
S5‑092463 | TR 32.823 v1.0.0 Telecommunication management; Study on Self-healing of SON (self-optimizing networks) Self-Optimization & Self-Healing OAM Requirements - for SA Information | ZTE | for email approval for SA Information with S5-092463 |
S5‑092464 | CR 32.532 NASWM IS – installNeSw Operation | Huawei, Vodafone | revised to S5-092639 |
S5‑092465 | CR 32.532 NASWM IS – activateNeSw Operation | Huawei, Vodafone | revised to S5-092637 |
S5‑092466 | CR 32.533 NASWM Corba SS – installNeSw Operation | Huawei | revised to S5-092636 |
S5‑092467 | CR 32.533 NASWM Corba SS – activateNeSw Operation | Huawei | revised to S5-092638 |
S5‑092468 | CR 32.531 Definitions for NASWM activities | Huawei | revised to S5-092640 |
S5‑092469 | CR 32.532 Editorial cleanup | Huawei, Nokia Siemens Networks | revised to S5-092641 |
S5‑092470 | TR 32.822 v1.0.0 Telecommunication management; Study on System Maintenance over Itf-N - for SA Information | ZTE | agreed for SA Information with S5-092448 |
S5‑092471 | Revised to SA5#64 S5-092073 Rel-9 CR 32.752 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | revised to S5-092606 |
S5‑092472 | CR R8 32.753 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | revised to S5-092607 |
S5‑092473 | CR R8 32.755 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | revised to S5-092608 |
S5‑092474 | R8 CR 32.762 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola, Ericsson | revised to S5-092622 |
S5‑092475 | Rel-9 mirror CR 32.762 Add the missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola, Ericsson | revised to S5-092625 |
S5‑092476 | R8 CR 32.763 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola, Ericsson | revised to S5-092623 |
S5‑092477 | Rel-9 mirror CR 32.763 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola, Ericsson | revised to S5-092626 |
S5‑092478 | R8 CR 32.765 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola, Ericsson | revised to S5-092624 |
S5‑092479 | Rel-9 mirror CR 32.765 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola, Ericsson | revised to S5-092627 |
S5‑092480 | CR R8 32.763 Add cell-size attribute in EUTRANGenericCell | Motorola | revised to S5-092613 |
S5‑092481 | CR R8 32.765 Add cell-size attribute in EUTRANGenericCell | Motorola | revised to S5-092614 |
S5‑092482 | E pCR 32.447 Trace Management SOAP SS | Ericsson | withdrawn |
S5‑092483 | New Umbrella BB-level WID for the SA5 work on User Data Convergence - Modelling and Management | China Mobile, T-Mobile, Ericsson | approved |
S5‑092484 | New WT-level WID on User Data Convergence - Common Baseline Information Model | Ericsson, China Mobile, Huawei, HP, ZTE, Alcatel-Lucent, Verizon, Vodafone | approved |
S5‑092485 | Correct the class diagram to include Non-Automated Software Management | Huawei | revised to S5-092642 |
S5‑092486 | New WT-level WID on User Data Convergence - Framework (UDC-MFRM) | T-Mobile, Ericsson, China Mobile, ZTE, Vodafone | approved |
S5‑092487 | Rel-9 CR 32.762 Add ICIC mgmt attribute in EUtranRelation | Huawei | revised to S5-092616 |
S5‑092488 | CR R9 32.763 Add ICIC mgmt attribute in EUtranRelation | Huawei | revised to S5-092617 |
S5‑092489 | CR R9 32.765 Add ICIC mgmt attribute in EUtranRelation | Huawei | revised to S5-092618 |
S5‑092490 | Rel-9 CR 32.151 Introduce Information Type in IS template | Ericsson | approved |
S5‑092491 | RG report for 6.05.8 SOAP Solution Sets | Ericsson (John) | noted |
S5‑092492 | CR 32.533 Add start step parameter for resume Operation (revision of S5-092303) | Huawei, Nokia Siemens Networks | revised to S5-092615 |
S5‑092493 | pCR TR 32.xxx (Study on Energy Savings Management) - Use Cases | Vodafone | agreed |
S5‑092494 | E CR 32.762 IOC Relations and UML updates | Ericsson | revised to S5-092619 |
S5‑092495 | CR E-UTRAN Measurement for paging discards at the eNodeB | Vodafone | revised to S5-092644 |
S5‑092496 | CR CMCC addition of eNodeB processor usage related measurements | China Mobile | approved |
S5‑092497 | CR CMCC addition of inter RAT relocation related measurements | China Mobile | revised to S5-092645 |
S5‑092498 | CR CMCC addition of MME processor usage related measurements | China Mobile | revised to S5-092648 |
S5‑092499 | draft LS_out from SA5 to BBF on co-operation | IP.Access, AT&T | revised to S5-092661 |
S5‑092500 | LS_out SA5 reply to TISPAN WG2 on IPTV related charging | SA5 (CH) | approved |
S5‑092501 | Updated WID on RTTI support in IMS charging | Orange | revised to S5-092537 |
S5‑092502 | CR R9 32.275 Add CUG offline charging | Alcatel-Lucent | approved |
S5‑092503 | CR R9 32.275 Add FA online charging | Alcatel-Lucent | revised to S5-092538 |
S5‑092504 | CR R9 32.275 Add CUG online charging | Alcatel-Lucent | revised to S5-092539 |
S5‑092505 | CR R9 32.299 MMTel additions | Alcatel-Lucent, ZTE | approved |
S5‑092506 | CR R9 32.298 MMTel additions | Alcatel-Lucent, ZTE | approved |
S5‑092507 | R8 CR 32.251 Incomplete Charging Characteristics description in Annex A | Alcatel-Lucent | rejected |
S5‑092508 | IWLAN mobility charging | Orange | revised to S5-092540 |
S5‑092509 | LS_out from SA5 to CT4 on Rel-9 AVP code range allocation | SA5 (CH) | approved |
S5‑092510 | R8 CR 32.299 Correction on Refund Information | Nokia Siemens Networks | approved |
S5‑092511 | CR R8 32.275 Clarification on MMTel charging architecture | Alcatel-Lucent | approved |
S5‑092512 | CR R8 32.251 Clarification on IP-CAN bearer offline charging | Alcatel-Lucent | approved |
S5‑092513 | CR R8 32.299 Complete LCS-information AVP description | Alcatel-Lucent | approved |
S5‑092514 | CR R8 32.251 Clarify the SGSN Charging description applies to SGSN with Gn/Gp connectivity | Alcatel-Lucent | approved |
S5‑092515 | CR R8 32.251 Alignment between PS-information used for offline charging and SGW / PGW CDRs | Alcatel-Lucent | revised to S5-092541 |
S5‑092516 | CR R8 32.299 PS-information AVP description alignement with 32.251 definition | Alcatel-Lucent | approved |
S5‑092517 | CR R8 32.298 SGW and PGW CDRs description alignement with TS 32.251 | Alcatel-Lucent | approved |
S5‑092518 | CR R8 32.251“Mobile Node Identifier” used for PMIP S5/S8 and S2a/S2b | Alcatel-Lucent | approved |
S5‑092519 | CR R8 32.298 “Mobile Node Identifier” used for PMIP S5/S8 and S2a/S2b in PGW CDR | Alcatel-Lucent | approved |
S5‑092520 | LS to CT3/CT4 on 3GPP2 BSID in PGW | Alcatel-Lucent | revised to S5-092542 |
S5‑092521 | CR 32251 Rel-8 Clarify IP-CAN bearer definition in PGW-CDR | Huawei | revised to S5-092543 |
S5‑092522 | Rel-9 CR 32.260 addition of online charging flag | China Mobile | approved |
S5‑092523 | Rel-9 CR 32.298 addition of online charging flag | China Mobile | revised to S5-092544 |
S5‑092524 | Rel-9 CR 32.299 addition of online charging flag | China Mobile | revised to S5-092545 |
S5‑092525 | R9 CR 32273 add message flow for UTRAN access in eMBMS charging | ZTE | approved |
S5‑092526 | R9 CR 32251 MBMS charging in EPS alignment in MBMS context bearer charging data aspect | ZTE | approved |
S5‑092527 | pCR Correction on message flows for Rc reference point | Nokia Siemens Networks, ZTE | revised to S5-092553 |
S5‑092528 | Updates to definitions for Rc reference | Openet | agreed |
S5‑092529 | pCR Clarification of Rc impact analysis | Huawei | revised to S5-092546 |
S5‑092530 | Message analysis in Rc reference point | Huawei | rejected |
S5‑092531 | LS to SA2 on ChCh alignment | Alcatel-Lucent | revised to S5-092551 |
S5‑092532 | R9 CR32260 Add field in CDR contents | Orange, Ericsson | withdrawn |
S5‑092533 | R9 CR32298 CDR parameter for RTTI in IMS offline charging | Orange, Ericsson | withdrawn |
S5‑092534 | R9 CR32298 AVP for RTTI in IMS offline charging | Orange, Ericsson | withdrawn |
S5‑092535 | TR 32.825 for information to TSG-SA | Huawei | revised to S5-092552 |
S5‑092536 | Rel-9 CR 32.299 correction of timestamp granularity | Ericsson, Nokia Siemens Networks | revised to |
S5‑092537 | Updated WID on RTTI support in IMS charging | Orange | revised to S5-092655 |
S5‑092538 | CR R9 32.275 Add FA online charging | Alcatel-Lucent | approved |
S5‑092539 | CR R9 32.275 Add CUG online charging | Alcatel-Lucent | approved |
S5‑092540 | IWLAN mobility charging | Orange | revised to S5-092656 |
S5‑092541 | CR R8 32.251 Alignment between PS-information used for offline charging and SGW / PGW CDRs | Alcatel-Lucent | approved |
S5‑092542 | LS_out from SA5 to CT3/CT4 on 3GPP2 User location parameter availability in the P-GW for Charging purpose | SA5 (CH) | approved |
S5‑092543 | CR 32251 Rel-8 Clarify IP-CAN bearer definition in PGW-CDR | Huawei | rejected |
S5‑092544 | Rel-9 CR 32.298 addition of online charging flag | China Mobile | approved |
S5‑092545 | Rel-9 CR 32.299 addition of online charging flag | China Mobile | approved |
S5‑092546 | Clarification of Rc impact analysis | Huawei | agreed |
S5‑092547 | Rel-9 CR 32.299 correction of timestamp granularity | Ericsson, Nokia Siemens Networks | approved (withdrawn CR from SA5#64 S5-092140) |
S5‑092548 | R8 CR 32.251 Correction on EPC Charging | Nokia Siemens Networks | approved |
S5‑092549 | R8 CR 32.298 Correction on EPC Charging | Nokia Siemens Networks | approved |
S5‑092550 | R8 CR 32.299 Correction on EPC Charging | Nokia Siemens Networks | approved |
S5‑092551 | LS_out from SA5 to SA2, CT4 on on “Charging Characteristics” description in non-SA5 specifications | SA5 (CH) | approved |
S5‑092552 | TR 32.825 v1.0.0 Telecommunication management; Charging management; Rc Reference Point Study - for SA Information | Huawei | agreed for SA Information |
S5‑092553 | Correction on message flows for Rc reference point | Nokia Siemens Networks, ZTE | agreed |
S5‑092600 | SGW Trace Record content | Nokia Siemens Network | approved |
S5‑092601 | PGW Trace Record content for Gx and S6b interfaces | Nokia Siemens Network | approved |
S5‑092602 | Trace Interface list correction in 32.421 [in response to LS from CT4 (S5-092408)] | Alcatel-Lucent | revised to S5-092620 |
S5‑092603 | LS_out SA5 reply to CT4 on Trace Interface list | SA5 OAM | revised to S5-092657 |
S5‑092604 | CR R8 32.423-800 NAS signalling messages in MME | Ericsson | approved |
S5‑092605 | Trace Interface list correction in 32.422 [in response to LS from CT4 (S5-092408)] | Alcatel-Lucent | approved with S5-092620 |
S5‑092606 | Revised to SA5#64 S5-092073 Rel-9 CR 32.752 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | approved (and withdraw S5-092073) |
S5‑092607 | CR R8 32.753 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | approved |
S5‑092608 | CR R8 32.755 Add ExternalMmeFunction IOC and relations for MMEPools | Motorola | approved |
S5‑092609 | CR R8 32.753 Add missing ExternalSGWFunction IOC and attrbutes for SGWFunction | Motorola | approved |
S5‑092610 | CR R8 32.755 Add missing ExternalSGWFunction IOC and attrbutes for SGWFunction | Motorola | approved |
S5‑092611 | CR CMCC addition of SGi related measurements | China Mobile | revised to S5-092647 |
S5‑092612 | LS_out SA5 reply to BBF on use of TR-069 for HNB Management & Northbound Interface (reply to S5-092248) | SA5 OAM | revised to S5-092658 |
S5‑092613 | CR R8 32.763 Add cell-size attribute in EUTRANGenericCell | Motorola | approved without presentation |
S5‑092614 | CR R8 32.765 Add cell-size attribute in EUTRANGenericCell | Motorola | approved without presentation |
S5‑092615 | CR 32.533 Add start step parameter for resume Operation (revision of S5-092303) | Huawei, Nokia Siemens Networks | approved without presentation |
S5‑092616 | Rel-9 CR 32.762 Add ICIC mgmt attribute in EUtranRelation | Huawei | approved with S5-092616 and S5-092617 |
S5‑092617 | CR R9 32.763 Add ICIC mgmt attribute in EUtranRelation | Huawei | approved with S5-092616 and S5-092617 |
S5‑092618 | CR R9 32.765 Add ICIC mgmt attribute in EUtranRelation | Huawei | approved with S5-092616 and S5-092617 |
S5‑092619 | E CR 32.762 IOC Relations and UML updates | Ericsson | approved (NSN objected - Reason: SA5 methodology not applied) |
S5‑092620 | Trace Interface list correction in 32.421 [in response to LS from CT4 (S5-092408)] | Alcatel-Lucent | approved with S5-092605 |
S5‑092621 | CR Correction of Class Diagram in 32.762 | ZTE | approved without presentation |
S5‑092622 | R8 CR 32.762 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola | approved (Ericsson objected) |
S5‑092623 | R8 CR 32.763 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola | approved (Ericsson objected) |
S5‑092624 | R8 CR 32.765 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola | approved (Ericsson objected) |
S5‑092625 | Rel-9 mirror CR 32.762 Add the missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola | approved (Ericsson objected - Reason: premature) |
S5‑092626 | Rel-9 mirror CR 32.763 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola | approved (Ericsson objected - Reason: premature) |
S5‑092627 | Rel-9 mirror CR 32.765 Add missing downlink power related attributes for EUTRAN Cell – align with 36.213 and 36.331 | Motorola | approved (Ericsson objected - Reason: premature) |
S5‑092628 | pCR 32.584 CM File Format | IP.Access, Vodafone, AT&T | agreed |
S5‑092629 | 32.581 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | postponed (more discussion needed) |
S5‑092630 | 32.583 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | postponed (more discussion needed) |
S5‑092631 | Rel-9 CR 32.583 Clarification on HNB CM procedure flow via file download | Huawei | approved without presentation |
S5‑092632 | Rel-9 CR 32.581 Add requirement for HMS’s performing frequency configuration to HNB | China Mobile | approved without presentation |
S5‑092633 | CR 32.532 NASWM IS – downloadNeSw Operation | Huawei, Vodafone | approved without presentation |
S5‑092634 | CR 32.533 NASWM Corba SS – downloadNeSw Operation | Huawei | approved without presentation |
S5‑092635 | Way forward for design and maintenance for TR 069 based Data Models for HNB and HeNB management | Ericsson, NEC, Nokia Siemens Networks | noted |
S5‑092636 | CR 32.533 NASWM Corba SS – installNeSw Operation | Huawei | approved without presentation |
S5‑092637 | CR 32.532 NASWM IS – activateNeSw Operation | Huawei, Vodafone | approved without presentation |
S5‑092638 | CR 32.533 NASWM Corba SS – activateNeSw Operation | Huawei | approved without presentation |
S5‑092639 | CR 32.532 NASWM IS – installNeSw Operation | Huawei, Vodafone | approved without presentation |
S5‑092640 | CR 32.531 Definitions for NASWM activities | Huawei | approved without presentation |
S5‑092641 | CR 32.532 Editorial cleanup | Huawei, Nokia Siemens Networks | approved without presentation |
S5‑092642 | Correct the class diagram to include Non-Automated Software Management | Huawei | for email approval |
S5‑092643 | updated WID approved at SA#42 in SP-080794 (3G HNB GW OAM&P) in line with S5-092071 from SA5#64 | China Mobile | approved |
S5‑092644 | CR E-UTRAN Measurement for paging discards at the eNodeB | Vodafone | approved without presentation |
S5‑092645 | CR CMCC addition of inter RAT relocation related measurements | China Mobile | approved without presentation |
S5‑092646 | 32.582 Rel9 CR Add Fault Management Periodic File capability | IP.Access, Vodafone, AT&T | postponed (more discussion needed) |
S5‑092647 | CR CMCC addition of SGi related measurements | China Mobile | approved |
S5‑092648 | CR CMCC addition of MME processor usage related measurements | China Mobile | approved without presentation |
S5‑092654 | pCR Add Specification Level Requirements For Self-Optimization Management | Huawei, Vodafone, China Mobile, ZTE | for email approval |
S5‑092655 | Updated WID on RTTI support in IMS charging | Orange | approved |
S5‑092656 | New WID on IWLAN mobility charging | Orange | approved |
S5‑092657 | LS_out SA5 reply to CT4 on Trace Interface list | SA5 | approved |
S5‑092658 | LS_out SA5 reply to BBF on use of TR-069 for HNB Management & Northbound Interface (reply to S5-092248) | SA5 OAM | approved |
S5‑092659 | LS_out from SA5 to BBF on work split | ALU | revised to S5-092660 |
S5‑092660 | LS_out from SA5 to BBF on clarifications as regards copy/paste policy for BBF text into 3GPP documents | SA5 | approved |
S5‑092661 | LS_out from SA5 to BBF on working agreement for HNB/HeNB data model development for 3GPP Rel-9 | SA5 | approved |
page generated from database: 2024-04-22 07:58:53