The 5G Standard

3GPP Work Item mapping to Change Requests


3GPP Work Item = 53088 (REDHOT-MStest)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
51.010-1 4302 51.010-1-4302 New Test case 58c.3.2a Acknowledged Mode/ Downlink TBF/ Split RLC Data Block, in EGPRS2A”
51.010-1 4302 rev 1 51.010-1-4302 New Test case 58c.3.2a Acknowledged Mode/ Downlink TBF/ Split RLC Data Block, in EGPRS2A”
51.010-1 4307 51.010-1-4307 New Test case 14.18.4a – Intermodulation Rejection in EGPRS2A Configuration
51.010-1 4307 rev 1 51.010-1-4307 New Test case 14.18.4a – Intermodulation Rejection in EGPRS2A Configuration
51.010-1 4308 51.010-1-4308 New Test case 14.18.1a- Minimum Input level for Reference Performance in EGPRS2A Configuration
51.010-1 4308 rev 1 51.010-1-4308 New Test case 14.18.1a- Minimum Input level for Reference Performance in EGPRS2A Configuration
51.010-1 4343 CR 51.010-1-4343 New Test case 14.18.5a - Blocking and spurious response in EGPRS2A configuration
51.010-1 4346 CR 51.010-1-4346 New Test case 14.18.3a Adjacent channel rejection in EGPRS2A configuration
51.010-1 4346 rev 1 CR 51.010-1-4346 New Test case 14.18.3a Adjacent channel rejection in EGPRS2A configuration
51.010-1 4412 CR 51.010-1-4412 New Test case 13.17.4a - Output RF spectrum in EGPRS2A configuration
51.010-1 4537 CR 51.010-1-4537 13.17.2a New Test: Frequency error under multipath and interference conditions for EGPRS2A configuration
51.010-1 4538 CR 51.010-1-4538 22.8a New Test: EGPRS2A uplink power control- use of  and CH parameter
51.010-1 4538 rev 1 CR 51.010-1-4538 22.8a New Test: EGPRS2A uplink power control- use of  and CH parameter
51.010-1 4539 CR 51.010-1-4539 22.9a New Test: EGPRS2A uplink power control – independence of TS power control
51.010-1 4565 CR 51.010-1-4565 New Test case 14.18.7a – Incremental redundancy in EGPRS2A configuration
51.010-1 4565 rev 1 CR 51.010-1-4565 New Test case 14.18.7a – Incremental redundancy in EGPRS2A configuration
51.010-1 4593 CR 51.010-1-4593 New Test case “MEAN_BEP 16-QAM in EGPRS2A configuration”
51.010-1 4593 rev 1 CR 51.010-1-4593 New Test case “MEAN_BEP 16-QAM in EGPRS2A configuration”
51.010-1 4594 CR 51.010-1-4594 New Test case “MEAN_BEP 32-QAM in EGPRS2A configuration”
51.010-1 4594 rev 1 CR 51.010-1-4594 New Test case “MEAN_BEP 32-QAM in EGPRS2A configuration”
51.010-2 0618 51.010-2-0618 Addition of new EGPRS2A RF test cases-14.18.1a,14.18.2a and 14.18.4a
51.010-2 0643 CR 51.010-2-0643 Addition of new RF EGPRS2A test cases- 14.18.6a
51.010-2 0647 CR 51.010-2-0647 Introduction of applicability of new RF test tescase for EGPRS2A configuration
51.010-2 0683 CR 51.010-2-0683 Introduction of applicability of new RF test tescase for EGPRS2A configuration
51.010-2 0703 CR 51.010-2-0703 Addition of new RF EGPRS2A test cases- 14.18.7a
51.010-2 0706 CR 51.010-2-0706 Addition of new Test cases 21.11a and 21.12a in 51.010-2
51.010-2 0706 rev 1 CR 51.010-2-0706 Addition of new Test cases 21.11a and 21.12a in 51.010-2

page generated from database: 2024-04-28 19:33:05

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links