The 5G Standard

3GPP Work Item mapping to Change Requests


3GPP Work Item = 25034 (RANimp-UEConTest_CPC)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
34.108 0659 Addition of RB setup message contents for CPC
34.108 0678 Addition of new Test Bearer for MAC CPC testing
34.108 0679 CPC: Corrections to Radio Bearer Setup message contents for conditions A20 A21
34.121-1 0903 Introduction of continuous packet connectivity (CPC) to ôOut-of-syncronization handling of output powerö
34.121-1 0922 Introduction of continuous packet connectivity (CPC) to E-TFC restriction
34.121-1 1005 Introduction of HS-SCCH-less demodulation requirements for CPC
34.121-1 1047 Introduction of continuous packet connectivity (CPC) to intrafrequency CPICH measurement requirements
34.121-1 1059 to 34.121-1: Correction to Transmit ON/OFF Power test cases for CPC requirements
34.121-2 0036 Addition of HS-SCCH-less demodulation of HS-DSCH test case
34.123-1 2087 New CPC test case for physical channel reconfiguration with DTX_DRX_STATUS variable and corresponding actions
34.123-1 2088 New CPC test case for physical channel reconfiguration with HS_SCCH_LESS_STATUS variable and corresponding actions.
34.123-1 2089 New MAC test case for grant monitoring in discontinuous downlink reception operation
34.123-1 2090 New CPC test case for RB establishment with start of DTX
34.123-1 2091 New CPC test case for RB establishment with start of HS-SCCH less operation
34.123-1 2092 MAC E-TFCI Selection for CPC
34.123-1 2093 MAC HS-SCCH Less Operation for CPC
34.123-1 2158 Addition of a new test case for CPC: CQI reporting in UL.
34.123-1 2159 Addition of a new test case for CPC: UL DPCCH slot format #4
34.123-1 2160 New CPC test case for Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (frequency modification, stop of discontinuous uplink transmission)
34.123-1 2161 New CPC test case for Physical Channel Reconfiguration for transition from CELL_DCH to URA_PCH: Success (frequency modification, stop of discontinuous uplink transmission)
34.123-1 2162 New CPC test case for Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (serving E-DCH cell change with discontinuous uplink transmission)
34.123-1 2163 New CPC test case for Physical channel reconfiguration for transition from CELL_DCH to CELL_DCH …
34.123-1 2164 New CPC test case for Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Failure (Timing …
34.123-1 2165 New CPC test case for Cell Update: Transition from URA_PCH to CELL_DCH: Success (start of discontinuous uplink transmission)
34.123-1 2166 New CPC test case for Cell Update: Transition from CELL_PCH to CELL_DCH: Success (frequency modification, start of discontinuous uplink transmission)
34.123-1 2167 New CPC test case for Cell Update: Radio Link Failure, with active discontinuous uplink transmission
34.123-1 2168 New CPC test case for Inter-RAT Cell Change Order from UTRAN to GPRS/CELL_DCH/Success (stop of discontinuous uplink transmission)
34.123-1 2169 Corrections to CPC RRC test cases
34.123-1 2170 New CPC test case: RRC Connection Establishment for transition from Idle Mode to CELL_DCH: Success (start of discontinuous uplink transmission)
34.123-1 2171 New CPC test case: Radio Bearer Reconfiguration from CELL_DCH to CELL_DCH: Success (With active discontinuous uplink transmission)
34.123-1 2172 New CPC test case: Radio Bearer Reconfiguration for transition from CELL_FACH to CELL_DCH and CELL_DCH to CELL_FACH: Success (start and stop of discontinuous uplink transmission)
34.123-1 2173 New CPC test case: Radio Bearer Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (hard handover to another frequency, start and stop of discontinuous uplink transmission)
34.123-1 2174 New CPC test case: Radio Bearer Reconfiguration for transition from CELL_FACH to CELL_DCH and CELL_DCH to CELL_FACH: Success …
34.123-1 2175 New CPC test case: Radio Bearer Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (Start and stop of discontinuous uplink transmission)
34.123-1 2176 New CPC test case: Radio Bearer Reconfiguration for transition from CELL_DCH to CELL_PCH: Success (stop of discontinuous uplink transmission)
34.123-1 2253 Correction to Rel-7 MAC test case 7.1.5b.1
34.123-1 2254 Correction to Rel-7 MAC test case 7.1.6.2.11
34.123-1 2255 Correction to Rel-7 MAC test case 7.1.6.3.3
34.123-1 2256 Correction to Rel-7 MAC test case 7.1.6.4.3
34.123-1 2257 CPC: Corrections to RRC Connection Establishment test case 8.1.2.19
34.123-1 2177 New CPC test case: Radio Bearer Establishment for transition from CELL_DCH to CELL_DCH: Success (hard handover to another frequency, start of discontinuous uplink transmission)
34.123-1 2178 New CPC test case: Active set update in soft handover: Radio Link addition and serving HS-DSCH / E-DCH cell change, with discontinuous uplink transmission.
34.123-1 2258 CPC: Corrections to Radio Bearer Establishment and Reconfiguration test cases in section 8.2.1.x – 8.2.3.x
34.123-1 2259 CPC: Corrections to Physical Channel Reconfiguration test cases in section 8.2.6.x
34.123-1 2260 CPC: Correction to Cell Update and Active Set Update test cases in sections 8.3.1.x and 8.3.4.11
34.123-2 0337 Applicability for new CPC test cases
34.123-2 0358 Applicability for new CPC test cases
34.123-2 0359 Applicability change for corrected CPC test case 8.2.6.55

page generated from database: 2024-04-28 19:33:05

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links