The 5G Standard

3GPP Work Item mapping to Change Requests


3GPP Work Item = 1600 (LCS1-UEPos)

This page lists the approved Change Requests to 3GPP Technical Specifications and Reports associated with the above work item. Click on the CR find it in the CR table associated with the spec to which it pertains. Click on the spec to open its web page.

Spec CR number and Revision CR Title
25.104 0123 Node B requirements for IPDL
25.104 0135 Node B requirements for IPDL
25.104 0139 Node B requirements for IPDL
25.104 0140 Node B requirements for IPDL
25.104 0155 Node B requirements for IPDL
25.104 0156 Node B requirements for IPDL
25.123 0074 UTRAN SFN-SFN observed time difference
25.123 0077 UTRAN GPS timing of cell frames for UP mapping
25.123 0115 UTRAN SFN-SFN otd corrections
25.133 0237 rev SFN-SFN observed time difference measurement
25.133 0238 rev SFN-SFN observed time difference measurement
25.133 0322 UE GPS Code Phase Measurement and Related Test Cases
25.133 0324 UE GPS Code Phase Measurement and Related Test Cases
25.224 0061 Corrections and Clarifications for calculation of idle period position in subclause 4.10.3 in 25.224

page generated from database: 2024-04-28 19:33:05

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links