3GPP TDocs (written contributions) at meeting
Meeting: R2-77b - 2012-03-26 to 2012-03-30, Jeju
meeting id: R2-77b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R2‑121060 | Proposed agenda for RAN2 #77bis, Jeju, Korea, 26.03.-30.03.2012 | Ericsson (RAN2 chairman) | Agenda |
R2‑121061 | Draft report of RAN2 #77, Dresden, Germany, 06.02.-10.02.2012 | ETSI MCC | Report |
R2‑121062 | Reply LS to GP-111889 = R2-120009 on issues on inbound CSG mobility failure (C1-120479; contact: Huawei) | CT1 | LSin |
R2‑121063 | LS on RR failures and network reselection (C1-120546; contact: Alcatel-Lucent) | CT1 | LSin |
R2‑121064 | Reply LS to R2-115643 on stage 3 for modification of security context storage rate on the UICC (C1-120658; contact: NSN) | CT1 | LSin |
R2‑121065 | LS on structure of "IP address/ports and selected codec for the IMS media anchoring" in CS to PS SRVCC (C1-120827; contact: Ericsson) | CT1 | LSin |
R2‑121066 | LS on re-documentation and alignment of PWS (C1-120900; contact: Ericsson) | CT1 | LSin |
R2‑121067 | Reply LS to R2-116525 on Extended Access Barring (C1-120907; contact: NSN) | CT1 | LSin |
R2‑121068 | Reply LS to GP-111889 = R2-120009 on issues on Inbound CSG Mobility Failure (C4-120581; contact: Huawei) | CT4 | LSin |
R2‑121069 | Reply LS to C1-120900 = R2-121066 on re-documentation and alignments of PWS (GP-120301; contact: Ericsson) | GERAN2 | LSin |
R2‑121070 | Response to LS R2-121051 on Clarification to the handling of the RRC container during inter-RAT handover (GP-120440; contact: ZTE) | GERAN2 | LSin |
R2‑121071 | LS on Reverse SRVCC from UTRAN/GERAN to E-UTRAN/HSPA (GP-120442; contact: ZTE) | GERAN2 | LSin |
R2‑121072 | Reply LS to C1-120479 = R2-121062 and C4-120581 = R2-121068 on issues on inbound CSG mobility failure (GP-120443; contact: Huawei) | GERAN2 | LSin |
R2‑121073 | Reply LS to R3-120373 = R2-121027 on CSFB awareness in UMTS and GERAN (GP-120450; contact: Vodafone) | GERAN2 | LSin |
R2‑121074 | LS on Summary of RAN1 agreements on Closed Loop Transmit Diversity (R1-120859; contact: Qualcomm) | RAN1 | LSin |
R2‑121075 | LS response to R2-115642 of MDT UL Coverage Use Case (R1-120923; contact: Huawei) | RAN1 | LSin |
R2‑121076 | LS on feICIC (R1-120927; contact: Qualcomm) | RAN1 | LSin |
R2‑121077 | LS on CSI-RS based measurement for CoMP (R1-120929; contact: Samsung) | RAN1 | LSin |
R2‑121078 | LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA (R1-120946; contact: Panasonic) | RAN1 | LSin |
R2‑121079 | LS on Capability Indicator for SRVCC from UTRAN/GERAN to E-UTRAN/HSPA (R3-120451; contact: Huawei) | RAN3 | LSin |
R2‑121080 | LS on Clarifications on solutions for 3G Macro to Femto hand-in for non-CSG UEs (R3-120452; contact: NSN) | RAN3 | LSin |
R2‑121081 | LS on battery impact due to CLTD (R4-121114; contact: Qualcomm) | RAN4 | LSin |
R2‑121082 | LS requesting clarification of whether the UE’s Whitelist is updated after Manual Selection to Hybrid CSG Cell (R5-120761; contact: Intel) | RAN5 | LSin |
R2‑121083 | LS on EAB for network sharing (S2-121100; contact: Huawei) | SA2 | LSin |
R2‑121084 | LS on UE AS capability request over S1 (S2-121158; contact: Ericsson) | SA2 | LSin |
R2‑121085 | Reply LS to GP-111900 on agreements on SRVCC from CS to PS (S2-121160; contact: ZTE) | SA2 | LSin |
R2‑121086 | LS on MDT and relaxation of country restriction (S3-120232; contact: TeliaSonera) | SA3 | LSin |
R2‑121087 | LS on PWS Requirements for UEs in Limited Service State (S3-120241; contact: Ericsson) | SA3 | LSin |
R2‑121088 | RAN WG2 compendium v15.0 | ETSI MCC | Info |
R2‑121089 | Void | - | - |
R2‑121090 | Void | - | imported from 3GU |
R2‑121091 | SPS Reconfiguration | Nokia Siemens Networks, ASUSTeK, LGE | imported from 3GU |
R2‑121092 | IDC Signalling Procedure | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121093 | IDC Gaps and HARQ Operation | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121094 | MBMS Service continuity and CSG cells | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121095 | IDC and MDT | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121096 | Inter-eNB Communication for IDC | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121097 | IDC Signalling to Target eNB | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121098 | Correction of semantics description of k in CELL_DCH measurement occasion info LCR | TD Tech | imported from 3GU |
R2‑121099 | Correction of semantics description of k in CELL_DCH measurement occasion info LCR | TD Tech | imported from 3GU |
R2‑121100 | Correction of semantics description of k in CELL_DCH measurement occasion info LCR | TD Tech | imported from 3GU |
R2‑121101 | EAB and ACB procedures | Samsung | imported from 3GU |
R2‑121102 | Autonomous denial for Wi-Fi Beacon | Samsung | imported from 3GU |
R2‑121103 | Uplink related corrections in TS 25.319 | TD Tech | imported from 3GU |
R2‑121104 | Uplink related corrections in TS 25.319 | TD Tech | imported from 3GU |
R2‑121105 | Correction to inter-RAT absolute priority based cell reselection without priority being assigned | ZTE | imported from 3GU |
R2‑121106 | Correction to definition of enhanced inter-frequency measurements without CM | ZTE | imported from 3GU |
R2‑121107 | Clarification about capability scope of enhanced inter-frequency measurements without CM | ZTE | imported from 3GU |
R2‑121108 | Correction of ANR handlings upon UE detach or switch off | ZTE | imported from 3GU |
R2‑121109 | Consideration on frequency band specific AG operation | ZTE | imported from 3GU |
R2‑121110 | Consideration on some enhanced 3G ANR issues | ZTE | imported from 3GU |
R2‑121111 | Consideration on Enhanced Redirection from UMTS to LTE in Cell_FACH | ZTE, China Unicom | imported from 3GU |
R2‑121112 | MBMS UE Capability | MediaTek Inc. | imported from 3GU |
R2‑121113 | VoLTE and VoHSPA capability indication | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121114 | Voice support Capabilities | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121115 | Voice support Capabilities | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121116 | SR-VCC radio bearer combination | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121117 | CSFB Indication in RRC Connection Setup | Nokia Siemens Networks, Nokia Corporation, Deutsche Telekom | imported from 3GU |
R2‑121118 | UE reaction on RRC Connection Rejection | Nokia Siemens Networks, Verizon Wireless, Alcatel-Lucent, Ericsson, ST-Ericsson | imported from 3GU |
R2‑121119 | SIB design for EAB | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121120 | NAS/AS coordination on EAB applicability | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121121 | RLF reporting across PLMNs | Nokia Siemens Networks, Nokia Corporation, CATT, LG Electronics Inc., MediaTek, TeliaSonera | imported from 3GU |
R2‑121122 | Logged MDT continuity across PLMNs | Nokia Siemens Networks, Nokia Corporation, CATT, LG Electronics Inc., MediaTek, TeliaSonera | imported from 3GU |
R2‑121123 | Evaluation of A2 trigger for Immediate MDT | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121124 | Further details for usage of Scheduled IP Throughput by MDT | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121125 | Clarification on networking sharing for MBMS | HTC | imported from 3GU |
R2‑121126 | Clarification on inter-RAT handover to EUTRAN | HTC | imported from 3GU |
R2‑121127 | SRS Update/Reset for NBPS | TruePosition | imported from 3GU |
R2‑121128 | T321 value for UTRA SI acquisition | Qualcomm Incorporated | imported from 3GU |
R2‑121129 | T321 value for SI acquisition in case of handover to UTRA | Qualcomm Incorporated | imported from 3GU |
R2‑121130 | UE indication of UL timing loss for secondary TA group | Qualcomm Incorporated | imported from 3GU |
R2‑121131 | Consideration on HetNet mobility problem | Qualcomm Incorporated | imported from 3GU |
R2‑121132 | HetNet mobility simulation with eICIC | Qualcomm Incorporated | imported from 3GU |
R2‑121133 | Inter-frequency small cell identification with selected broadcast signals | Qualcomm Incorporated | imported from 3GU |
R2‑121134 | Solutions to decrease signaling overhead in R11 eDDA | CMCC, CATT | imported from 3GU |
R2‑121135 | Consideration on A3/A5 event as reporting triggers for Immediate MDT | CMCC, ZTE, CATT | imported from 3GU |
R2‑121136 | Evaluation on DRX and Dormancy Timer for Background Traffic and IM Traffic | CATT | imported from 3GU |
R2‑121137 | Evaluation of SR for Background Traffic and IM Traffic | CATT | imported from 3GU |
R2‑121138 | SCell RA Failure | CATT | imported from 3GU |
R2‑121139 | RACH Configuration in sTAG | CATT | imported from 3GU |
R2‑121140 | Consideration on Multi-TA Capability | CATT | imported from 3GU |
R2‑121141 | Consideration on SRS Configuration | CATT | imported from 3GU |
R2‑121142 | Consideration on PHR | CATT | imported from 3GU |
R2‑121143 | Consideration on DRX Timer | CATT | imported from 3GU |
R2‑121144 | MBMS Assistance Information Related Issues | CATT | imported from 3GU |
R2‑121145 | MBMS UE Capability | CATT | imported from 3GU |
R2‑121146 | MBMS Continuity and the Relationship with CSG | CATT | imported from 3GU |
R2‑121147 | MBMS Service Continuity in RRC-Connected Mode | CATT | imported from 3GU |
R2‑121148 | Location Information Consideration for QoS Verification | CMCC, CATT, ZTE | imported from 3GU |
R2‑121149 | On the procedure of interference avoidance for IDC | CMCC | imported from 3GU |
R2‑121150 | Consideration on Autonomous denials | CMCC | imported from 3GU |
R2‑121151 | HSDPA Multiflow configuration | Nokia Siemens Networks | imported from 3GU |
R2‑121152 | Open issues for HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R2‑121153 | UE capabilities for HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R2‑121154 | Dynamic carrier deactivation for HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R2‑121155 | SRB with HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R2‑121156 | Introduction of Multiflow in TS 25.302 | Nokia Siemens Networks | imported from 3GU |
R2‑121157 | Introduction of Multiflow in TS 25.306 | Nokia Siemens Networks | imported from 3GU |
R2‑121158 | Introduction of Multiflow in TS 25.308 | Nokia Siemens Networks | imported from 3GU |
R2‑121159 | Discussion on FGI bits | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121160 | UE capability and MBMS | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121161 | UE behaviour based on assistance information and MBMS service broadcast status | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121162 | Summary of [77#32] LTE: HetNet Mobility: Impact of DRX on mobility performance | Nokia Corporation (rapporteur) | imported from 3GU |
R2‑121163 | HetNet mobility and DRX with keep alive traffic | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121164 | HetNet mobility and DRX with background traffic | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121165 | Discussion on HetNet Mobility | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121166 | Clarification of MAC-i PDU format when SI is sent alone before contention resolution | Broadcom Corporation | imported from 3GU |
R2‑121167 | About usage of speed for UE selection | NEC | imported from 3GU |
R2‑121168 | Granularity of MDT Throughput Measurement and Reporting | CATT | imported from 3GU |
R2‑121169 | MDT continuity when data interruption occurs | CATT | imported from 3GU |
R2‑121170 | Using TA+AOA positioning method for MDT | CATT, CMCC | imported from 3GU |
R2‑121171 | Discussion on UE speed criterion for MDT | CATT | imported from 3GU |
R2‑121172 | Impact of pico cell placement on mobility performance | CATT | imported from 3GU |
R2‑121173 | Analysis on FGIs for 3/4-mode UE | CATT | imported from 3GU |
R2‑121174 | Rel-10 FDD/TDD Capability/FGIs splitting | CATT | imported from 3GU |
R2‑121175 | Clarification on the impacts of measurement gap | CATT | imported from 3GU |
R2‑121176 | Clarification on the impacts of measurement gap | CATT | imported from 3GU |
R2‑121177 | Clarification on the impacts of measurement gap | CATT | imported from 3GU |
R2‑121178 | Timing reference cell for secondary TA group | Qualcomm Incorporated | imported from 3GU |
R2‑121179 | Cell reselection rules for UEs active in MBMS | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121180 | Introduction of parallel PRACH and PUSCH/PUCCH/SRS transmission | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO, INC. | imported from 3GU |
R2‑121181 | RLM on SCells | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121182 | Pathloss Reference for sTAG | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121183 | CSI-RS based measurement for CoMP | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121184 | Mobility performance evaluation for HetNet | New Postcom | imported from 3GU |
R2‑121185 | Performance evaluation for mobility in HetNet with TD-ICIC | New Postcom | imported from 3GU |
R2‑121186 | Evaluation on cell identification delay in HetNet with CRE | New Postcom | imported from 3GU |
R2‑121187 | Evaluation for mobility state estimation in HetNet | New Postcom | imported from 3GU |
R2‑121188 | Considerations on CoMP measurement management | New Postcom | imported from 3GU |
R2‑121189 | Considerations on RACH failure handling on SCell | New Postcom | imported from 3GU |
R2‑121190 | Considerations on TAG change Procedure | New Postcom | imported from 3GU |
R2‑121191 | Considerations on EAB information update procedure | New Postcom | imported from 3GU |
R2‑121192 | Path loss reference and RLM on SCell | New Postcom | imported from 3GU |
R2‑121193 | Radio link monitoring for Scell in Rel-11 | NTT DOCOMO, INC. | imported from 3GU |
R2‑121194 | Way forward for EAB update mechanism | CATT | imported from 3GU |
R2‑121195 | EAB SIB design for RAN sharing | CATT | imported from 3GU |
R2‑121196 | QCI mapping to UMTS in MDT | Acer Incorporated | imported from 3GU |
R2‑121197 | The scope of accessibility measurements for MDT | Acer Incorporated | imported from 3GU |
R2‑121198 | The need for CSFB indication from the UE | Vodafone, Qualcomm, Teliasonera, Alcatel-Lucent,Huawei | imported from 3GU |
R2‑121199 | Voice support Capabilities | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121200 | Voice support Capabilities | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121201 | UE assisted information for eDDA | Nokia Siemens Networks | imported from 3GU |
R2‑121202 | PUCCH analysis for EDDA | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121203 | UE assistance information for UE power saving and optimized network performance | Nokia Corporation | imported from 3GU |
R2‑121204 | PSC range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121205 | PSC range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121206 | PSC range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121207 | PCI range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121208 | PCI range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121209 | PCI range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121210 | PCI range note on RAN sharing | TeliaSonera | imported from 3GU |
R2‑121211 | UTRAN measurement showing the flaw in absolute priority cell reselection | TeliaSonera | imported from 3GU |
R2‑121212 | Correction to absolute priority cell reselection | TeliaSonera | imported from 3GU |
R2‑121213 | Correction to absolute priority cell reselection | TeliaSonera | imported from 3GU |
R2‑121214 | Correction to absolute priority cell reselection | TeliaSonera | imported from 3GU |
R2‑121215 | Correction to absolute priority cell reselection | TeliaSonera | imported from 3GU |
R2‑121216 | Inter-RAT Treselection enhancement | TeliaSonera | imported from 3GU |
R2‑121217 | Inter-RAT Treselection enhancement | TeliaSonera | imported from 3GU |
R2‑121218 | Handling of KPAS/EU-Alert | Samsung | imported from 3GU |
R2‑121219 | Clarification on CMAS usage | Samsung | imported from 3GU |
R2‑121220 | Clarification on CMAS usage | Samsung | imported from 3GU |
R2‑121221 | Clarification on mode specific dependent FGI bits | Samsung | imported from 3GU |
R2‑121222 | Clarification on mode specific dependent FGI bits | Samsung | imported from 3GU |
R2‑121223 | Clarificatoin on mode specific dependent FGI bits | Samsung | imported from 3GU |
R2‑121224 | Timer value for acquisition of system information upon handover to UTRA-FDD CSG cell | Samsung | imported from 3GU |
R2‑121225 | Introducing means to signal different REL-10 FDD/TDD Capabilities/FGIs for Dual-xDD UE | Samsung | imported from 3GU |
R2‑121226 | Clarification on setting of dedicated NS value for CA by E-UTRAN | Samsung | imported from 3GU |
R2‑121227 | Removal of redundant fields | Samsung | imported from 3GU |
R2‑121228 | Supporting Procedures for Uplink Positioning | Andrew Corp | imported from 3GU |
R2‑121229 | Fast EAB update mechanism | Panasonic | imported from 3GU |
R2‑121230 | Handling loss of Timing/ Pathloss Reference Cell | Panasonic | imported from 3GU |
R2‑121231 | TB size mismatch problem with ePHR in combination with Semi-Persistent Scheduling | Panasonic | imported from 3GU |
R2‑121232 | Issues on exceeding maximum timing difference of aggregated cells | Panasonic | imported from 3GU |
R2‑121233 | TAG Composition and related aspects | Panasonic | imported from 3GU |
R2‑121234 | Extend the carrier capability for two-carrier HSDPA for 1.28Mcps TDD | Qualcomm Incorporated. CATT, TD Tech, ZTE, Ericsson, ST-Ericsson | imported from 3GU |
R2‑121235 | Extend the carrier capability for two-carrier HSDPA for 1.28Mcps TDD | Qualcomm Incorporated. CATT, TD Tech, ZTE, Ericsson, ST-Ericsson | imported from 3GU |
R2‑121236 | Clarifications of the UE behaviours when initiating a cell update procedure for 1.28Mcps TDD | Qualcomm Incorporated, Ericsson | imported from 3GU |
R2‑121237 | Fast dormancy optimization | Qualcomm Incorporated | imported from 3GU |
R2‑121238 | Scheduling Information (SI) inclusion and detection during collision resolution in enhanced CELL_FACH | Qualcomm Incorporated | imported from 3GU |
R2‑121239 | UE behaviour regarding the IE 'wait time' | Qualcomm Incorporated | imported from 3GU |
R2‑121240 | PHR trigger issues for MTA | ZTE Corporation | imported from 3GU |
R2‑121241 | Pathloss and RLM for MTA | ZTE Corporation | imported from 3GU |
R2‑121242 | Discussion on RA problem in SCell | ZTE Corporation | imported from 3GU |
R2‑121243 | eICIC Issues for Idle Mode | ZTE Corporation | imported from 3GU |
R2‑121244 | Discussion on RA Issue in Reduced Power ABS | ZTE Corporation | imported from 3GU |
R2‑121245 | Performance Analysis on ABS in HetNet | ZTE Corporation | imported from 3GU |
R2‑121246 | Enhancement in DRX solution for IDC | ZTE Corporation | imported from 3GU |
R2‑121247 | Signaling Procedure of FDM solution for IDC | ZTE Corporation | imported from 3GU |
R2‑121248 | Small Cell Discovery in HetNet | Huawei, HiSilicon | imported from 3GU |
R2‑121249 | Discussion on the Handling of T304 in the RRC Connection Re-Establishment Procedure | ZTE Corporation | imported from 3GU |
R2‑121250 | Further Evaluation on Enhancements of Mobility State Estimation in HetNet | Huawei, HiSilicon | imported from 3GU |
R2‑121251 | CR Correction to the Handling of T304 in the RRC Connection Re-Establishment Procedure | ZTE Corporation | imported from 3GU |
R2‑121252 | Considerations on UE Assistance Information | ZTE Corporation | imported from 3GU |
R2‑121253 | Access concentration control for Always mandate acquiring the EAB info before access | Samsung | imported from 3GU |
R2‑121254 | Handling of CRS Interference | Huawei, HiSilicon | imported from 3GU |
R2‑121255 | Handling of CRS Interference | Huawei, HiSilicon | imported from 3GU |
R2‑121256 | Considerations on PUCCH Enhancements | ZTE Corporation | imported from 3GU |
R2‑121257 | DRX Enhancements for Power Saving | ZTE Corporation | imported from 3GU |
R2‑121258 | ABS Modeling and Simulation Results | Huawei, HiSilicon | imported from 3GU |
R2‑121259 | EAB Information Update Procedure | ZTE Corporation | imported from 3GU |
R2‑121260 | Additional Considerations on EAB application | ZTE Corporation | imported from 3GU |
R2‑121261 | Including MBSFN area ID into EUTRAN MBMS Assistance Information | ZTE Corporation | imported from 3GU |
R2‑121262 | Clarification of SR period | LG Electronics Inc. | imported from 3GU |
R2‑121263 | Clarification of SR period | LG Electronics Inc. | imported from 3GU |
R2‑121264 | Discussion on the Accuracy Requirement of Location Information for MDT | ZTE Corporation | imported from 3GU |
R2‑121265 | On Traffic volume measurement and additional throughput measurement for small data burst in LTE | Samsung | imported from 3GU |
R2‑121266 | Packet delay measurement for Rel-11 MDT | Samsung | imported from 3GU |
R2‑121267 | New information in SCRI message for UMTS Fast dormancy | Nokia Siemens Networks | imported from 3GU |
R2‑121268 | Location information enhancement for Rel-11 MDT | Samsung | imported from 3GU |
R2‑121269 | New information in SCRI message for UMTS Fast dormancy | Nokia Siemens Networks | imported from 3GU |
R2‑121270 | one to one mapping accurate location information for MDT QoS verification | Samsung | imported from 3GU |
R2‑121271 | MBMS service continuity for connection re-establishment | ASUSTeK | imported from 3GU |
R2‑121272 | On the reporting the failed RRC connection establishment | Samsung | imported from 3GU |
R2‑121273 | Consideration on MBMS interest indication and radio condition | ASUSTeK | imported from 3GU |
R2‑121274 | Event-triggered reporting for Rel-11 immediate MDT | Samsung | imported from 3GU |
R2‑121275 | Forwarding of extendedWaitTimer to upper layers | Samsung | imported from 3GU |
R2‑121276 | Forwarding of extendedWaitTimer to upper layers | Samsung | imported from 3GU |
R2‑121277 | Pico cell discovery in a Heterogeneous Network | Research In Motion UK Ltd. | imported from 3GU |
R2‑121278 | Random Access Response in multiple TA | Research In Motion UK Ltd. | imported from 3GU |
R2‑121279 | HetNet Mobility Performance with Cell Range Expansion | Research In Motion UK Ltd. | imported from 3GU |
R2‑121280 | Interference measurement for BT | Research In Motion UK Ltd. | imported from 3GU |
R2‑121281 | Signaling procedures for IDC operation | Research In Motion UK Ltd. | imported from 3GU |
R2‑121282 | Handling of a SR collision with ACK/NACK repetition | Research In Motion UK Ltd. | imported from 3GU |
R2‑121283 | Handling Time Advance Command when TAT is not running | Research In Motion UK Limited, Panasonic, ASUSTeK, Qualcomm Incorporated | imported from 3GU |
R2‑121284 | Handling of a SR collision with ACK/NACK repetition | Research In Motion UK Ltd. | imported from 3GU |
R2‑121285 | Avoiding decipher of PDCP PDUs to be discarded when header compression is not configured | Research In Motion UK Ltd. | imported from 3GU |
R2‑121286 | Potential interference for IDC operation | Research In Motion UK Ltd. | imported from 3GU |
R2‑121287 | QoS measurement and location association for MDT | Kyocera | imported from 3GU |
R2‑121288 | Enhanced availability of detailed location information | Kyocera | imported from 3GU |
R2‑121289 | Discussion about MDT logging stoppage | Kyocera | imported from 3GU |
R2‑121290 | Reselection priority with MBMS assistance information | Kyocera | imported from 3GU |
R2‑121291 | Network Controlled CELL_FACH mobility | Nokia Siemens Networks | imported from 3GU |
R2‑121292 | Addition of default radio configuration for CELL_FACH | Nokia Siemens Networks | imported from 3GU |
R2‑121293 | MBMS related Selection/Reselection issues with CSG cells | Kyocera | imported from 3GU |
R2‑121294 | Modification of security context storage rate on the UICC | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121295 | Draft Reply LS on stage 3 for modification of security context storage rate on the UICC | Nokia Siemens Networks | imported from 3GU |
R2‑121296 | MBMS service continuity for mobility to/from CSG cells | Kyocera | imported from 3GU |
R2‑121297 | PSC split and Interfrequency IDT measurements | Nokia Siemens Networks | imported from 3GU |
R2‑121298 | Draft Reply LS on Clarifications on solutions for 3G Macro to Femto hand-in for non-CSG UEs | Nokia Siemens Networks | imported from 3GU |
R2‑121299 | Investigation of DRX in HetNet | Huawei, HiSilicon | imported from 3GU |
R2‑121300 | Camping for CA-capable UE | LG Electronics Inc. | imported from 3GU |
R2‑121301 | UE Behaviour in RRC Idle UE | LG Electronics Inc. | imported from 3GU |
R2‑121302 | Further Discussion on Priority information | LG Electronics Inc. | imported from 3GU |
R2‑121303 | Use of RACH for accessibility measurement | LG Electronics Inc. | imported from 3GU |
R2‑121304 | UE mobility state aware HO and Inter-frequency Small Cell Detection | Pantech | imported from 3GU |
R2‑121305 | MBMS cell and CSG reselection for service | Pantech | imported from 3GU |
R2‑121306 | Discussion on non-zero power ABS | Pantech | imported from 3GU |
R2‑121307 | Deactivation of timing reference cell | Pantech | imported from 3GU |
R2‑121308 | TA validity in Multiple TA environments | Pantech | imported from 3GU |
R2‑121309 | RAR MAC CE with C-RNTI | Pantech | imported from 3GU |
R2‑121310 | IDC trigger procedure | Pantech | imported from 3GU |
R2‑121311 | DRX enhancement in IDC | Pantech | imported from 3GU |
R2‑121312 | IDC assistant information on inter-eNB handover | Pantech | imported from 3GU |
R2‑121313 | Discussion on Assistance information | LG Electronics Inc. | imported from 3GU |
R2‑121314 | Draft CR to 36.321 for inconsistent TB size handling for UL | Samsung, Research In Motion | imported from 3GU |
R2‑121315 | SPS reconfiguration during when SPS is activated | Samsung | imported from 3GU |
R2‑121316 | Draft CR to 36.331 for RRC connection reconfiguration failure due to activated SPS | Samsung | imported from 3GU |
R2‑121317 | Discussion on PCMAX reporting in inter-band CA | Samsung | imported from 3GU |
R2‑121318 | Draft LS to RAN4 on PCMAX reporting | Samsung | imported from 3GU |
R2‑121319 | Discussion on virtual Pcmax,c reporting | Samsung | imported from 3GU |
R2‑121320 | Discussion on voice packet segmentation due to Scheduling Information | Samsung | imported from 3GU |
R2‑121321 | Discussion on continuing ROHC context after handover | Samsung, Alcatel-Lucent | imported from 3GU |
R2‑121322 | Draft CR to 36.323 to support ROHC context continue | Samsung, Alcatel-Lucent | imported from 3GU |
R2‑121323 | Draft CR to 36.331 to support ROHC context continue | Samsung, Alcatel-Lucent | imported from 3GU |
R2‑121324 | TB sizes for WB-AMR | Samsung | imported from 3GU |
R2‑121325 | Discussion on inconsistent TB size | Samsung | imported from 3GU |
R2‑121326 | MDT Throughput Measurement for UMTS | MediaTek Inc. | imported from 3GU |
R2‑121327 | MDT Data Volume Measurement for UMTS | MediaTek Inc. | imported from 3GU |
R2‑121328 | UE location capabilities for UMTS, discussion for MDT | MediaTek Inc. | imported from 3GU |
R2‑121329 | MDT UL coverage use case | MediaTek Inc. | imported from 3GU |
R2‑121330 | UL coverage and RLF report | MediaTek Inc. | imported from 3GU |
R2‑121331 | [77#24] email disscussion report: MDT Latency Measurements | MediaTek Inc. | imported from 3GU |
R2‑121332 | MDT Enhanced Available Location | MediaTek Inc. | imported from 3GU |
R2‑121333 | MDT Requested Location | MediaTek Inc. | imported from 3GU |
R2‑121334 | MDT accessiblity measurement | MediaTek Inc. | imported from 3GU |
R2‑121335 | EAB SIB design for RAN sharing | MediaTek Inc. | imported from 3GU |
R2‑121336 | EAB for special access class | MediaTek Inc. | imported from 3GU |
R2‑121337 | Miscellaneous corrections for UL CLTD | Huawei, HiSilicon | imported from 3GU |
R2‑121338 | Error Cae for time reference | MediaTek Inc. | imported from 3GU |
R2‑121339 | SCell deactivation during random access procedure | MediaTek Inc. | imported from 3GU |
R2‑121340 | MAC impacts due to UL MIMO plus 64QAM | Huawei, HiSilicon | imported from 3GU |
R2‑121341 | DRX operation with different TDD UL/DL configurations | ASUSTeK, Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121342 | Congestion handling for MBMS | MediaTek Inc. | imported from 3GU |
R2‑121343 | MAC impacts due to HSDPA 4-brach MIMO | Huawei, HiSilicon | imported from 3GU |
R2‑121344 | UE categories for HSDPA 4-branch MIMO | Huawei, HiSilicon | imported from 3GU |
R2‑121345 | On MBMS interest indication | MediaTek Inc. | imported from 3GU |
R2‑121346 | MBMS UE Capability | MediaTek Inc. | imported from 3GU |
R2‑121347 | Discussions on SCell RA procedure when reaching PREAMBLE_TRAN_MAX | MediaTek Inc. | imported from 3GU |
R2‑121348 | Way Forward for IDC Trigger | MediaTek, CMCC, Nokia Siemens Networks, Huawei, HiSilicon, Qualcomm Incorporated, Samsung, Pantech, Broadcom, Renesas Mobile | imported from 3GU |
R2‑121349 | IDC Information Forwarding at Handover | MediaTek Inc. | imported from 3GU |
R2‑121350 | Corrections on the maximum number of frequency bands signalled by the UE | Huawei, HiSilicon | imported from 3GU |
R2‑121351 | Unusable Frequency Reporting | MediaTek Inc. | imported from 3GU |
R2‑121352 | ECID location method in MDT | MediaTek Inc. | imported from 3GU |
R2‑121353 | Speed State in HetNet | MediaTek Inc. | imported from 3GU |
R2‑121354 | Identifying background traffic | MediaTek Inc. | imported from 3GU |
R2‑121355 | Indicator of SCell-RA-RNTIoffset Signaling | MediaTek Inc. | imported from 3GU |
R2‑121356 | Summary of email discussion [77#20] - Joint: EAB: Handling of special access class (AC 11-15) for EAB | Huawei | imported from 3GU |
R2‑121357 | Summary of email discussion [77#21] - Joint: EAB: SIB design for RAN sharing | Huawei | imported from 3GU |
R2‑121358 | Assistance Information for MBMS UEs | Qualcomm Incorporated | imported from 3GU |
R2‑121359 | Signalling procedure for IDC | Huawei, HiSilicon | imported from 3GU |
R2‑121360 | On the need for System Time for eMBMS Operation | Qualcomm Incorporated | imported from 3GU |
R2‑121361 | Introduction of RAN overload control for MTC in 25.304 | Huawei, HiSilicon | imported from 3GU |
R2‑121362 | Introduction of Extended Access Barring | Samsung | imported from 3GU |
R2‑121363 | Introduction of RAN overload control for MTC in 25.331 | Huawei, HiSilicon | imported from 3GU |
R2‑121364 | Assistance information handling concerning the FDM and TDM solutions | Huawei, HiSilicon | imported from 3GU |
R2‑121365 | Introduction of RAN overload control for MTC in 36.304 | Huawei, HiSilicon | imported from 3GU |
R2‑121366 | Handling of the Timing Reference SCell Deactivation | LG Electronics Inc. | imported from 3GU |
R2‑121367 | Introduction of RAN overload control for MTC in 36.331 | Huawei, HiSilicon | imported from 3GU |
R2‑121368 | Performing RA procedure on cell other than the timing reference cell | LG Electronics Inc. | imported from 3GU |
R2‑121369 | TAG ID configuration for SCell in pTAG | LG Electronics Inc. | imported from 3GU |
R2‑121370 | Discussion on MDT Throughput Measurement for UMTS | Huawei, HiSilicon | imported from 3GU |
R2‑121371 | On the Frequency Information in the USD | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121372 | Clarification to scheduled IP throughput | Huawei, HiSilicon | imported from 3GU |
R2‑121373 | Clarification to scheduled IP throughput | Huawei, HiSilicon | imported from 3GU |
R2‑121374 | Uplink coverage for MDT | Huawei, HiSilicon | imported from 3GU |
R2‑121375 | MDT Filtering based on UE Speed | Huawei, HiSilicon | imported from 3GU |
R2‑121376 | Draft LS to CT1 on NAS/AS interaction for EAB | Huawei | imported from 3GU |
R2‑121377 | Handling of SCell RACH Problem | LG Electronics Inc. | imported from 3GU |
R2‑121378 | Handling of SCell Deactivation during SCell RA Procedure | LG Electronics Inc. | imported from 3GU |
R2‑121379 | VoIP continuity between LTE and UMTS | Qualcomm Incorporated | imported from 3GU |
R2‑121380 | VoIP continuity between LTE and UMTS | Qualcomm Incorporated | imported from 3GU |
R2‑121381 | PHR for sTAG | LG Electronics Inc. | imported from 3GU |
R2‑121382 | Correction to UL Parallel Transmission of Simultaneous Physical Channels | LG Electronics Inc. | imported from 3GU |
R2‑121383 | The applicability of mutiple PLMNs to MDT and RLF report and the related CR | Huawei, HiSilicon | imported from 3GU |
R2‑121384 | Remaining issues of TA group handling | Sharp | imported from 3GU |
R2‑121385 | Report of email discussion [77#30] - LTE: MBMS interest indication | LG Electronics Inc. | imported from 3GU |
R2‑121386 | Protection of the MBMS Counting Response message | LG Electronics Inc. | imported from 3GU |
R2‑121387 | UE behaviours after UE is barred due to EAB | LG Electronics Inc. | imported from 3GU |
R2‑121388 | Handling of MBMS Interest Indication for Mobility | LG Electronics Inc. | imported from 3GU |
R2‑121389 | Further discussion on MBMS service continuity | LG Electronics Inc. | imported from 3GU |
R2‑121390 | Mobility between MBMS and CSG | LG Electronics Inc. | imported from 3GU |
R2‑121391 | New capability information for VoHSPA and VoLTE | Samsung | imported from 3GU |
R2‑121392 | Differentiating UTRAN modes in FGIs | Qualcomm Incorporated | imported from 3GU |
R2‑121393 | Draft response LS on VoHSPA capability indication | Samsung | imported from 3GU |
R2‑121394 | Rel-10 FDD-TDD Capability split | Qualcomm Incorporated | imported from 3GU |
R2‑121395 | Clarification of the setting of Pre-redirection Info IE | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121396 | Extending S-RNTI without impacting the UE or RRC signalling | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121397 | Decision criteria for EAB update procedure | ETRI | imported from 3GU |
R2‑121398 | Whether to allow configurable pathloss reference in STAG? | Samsung | imported from 3GU |
R2‑121399 | Preventing RAN overload on the legacy networks | ASUSTeK | imported from 3GU |
R2‑121400 | Introduction of Extended S-RNTI | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121401 | Max power is same for all PAs or not? | Samsung | imported from 3GU |
R2‑121402 | Draft LS on Tx architecture for inter-band CA | Samsung | imported from 3GU |
R2‑121403 | Further analysis on timing reference for sTAG | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121404 | Remaining issue on random access failure for SCell | Samsung | imported from 3GU |
R2‑121405 | Need of more than two TA groups | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121406 | Discussion on DRX for CC specific TDD configuration | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121407 | Handling PDCCH orders during RA | Acer Incorporated | imported from 3GU |
R2‑121408 | Inter-site DL DRX with HSDPA Multiflow | Nokia Siemens Networks, InterDigital Communications, Huawei, HiSilicon | imported from 3GU |
R2‑121409 | Analysis of RA Failure Handling | Acer Incorporated | imported from 3GU |
R2‑121410 | Clarification related with the STAG configurations | Samsung | imported from 3GU |
R2‑121411 | Correction to SCell Deactivation | Acer Incorporated | imported from 3GU |
R2‑121412 | Initial overview on new carrier | Samsung | imported from 3GU |
R2‑121413 | Corrections to the UE Frequency Band signalling in both Tabular and ASN.1 | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121414 | Editorial updates to 25.331 | Ericsson (rapporteur) | imported from 3GU |
R2‑121415 | Corrections for UL CLTD | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121416 | Mobility State Estimation consideration | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121417 | Small Cell Detection | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121418 | Correction to IE 'Pre-Redirection info' after a failed redirection to E-UTRA | Research In Motion UK Ltd. | imported from 3GU |
R2‑121419 | Reading System Information at 9 dB range extension | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121420 | Measurement framework based on CSI-RS | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121421 | Considerations on the mobility with HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R2‑121422 | Correction to IE 'Pre-Redirection info' after a failed redirection to E-UTRA | Research In Motion UK Ltd. | imported from 3GU |
R2‑121423 | SI transmission during contention resolution | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121424 | Analysis of PUCCH efficiency for eDDA | China Unicom | imported from 3GU |
R2‑121425 | Correction to IE 'Pre-Redirection info' after a failed redirection to E-UTRA | Research In Motion UK Ltd. | imported from 3GU |
R2‑121426 | SI attachment during DCCH/DTCH EUL transmission in CELL_FACH state | Ericsson, ST-Ericsson, Broadcom Corporation, ZTE | imported from 3GU |
R2‑121427 | 2 / 10 ms TTI design for the enhanced CELL_FACH | Nokia Siemens Networks | imported from 3GU |
R2‑121428 | Path loss reference for STAG | Huawei, HiSilicon | imported from 3GU |
R2‑121429 | Consideration on DRX Configuration for Background Traffic | China Unicom | imported from 3GU |
R2‑121430 | Further considerations on the 2nd DRX cycle for CELL_FACH | Nokia Siemens Networks | imported from 3GU |
R2‑121431 | Total E-DCH buffer size in case of CCCH transmission | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121432 | Consideration on Improvement of SR Resource Utilization | China Unicom | imported from 3GU |
R2‑121433 | PHR trigger for MTA | Huawei, HiSilicon | imported from 3GU |
R2‑121434 | Number of SCells with RACH configuration in a STAG | Huawei, HiSilicon | imported from 3GU |
R2‑121435 | Correction to reception of HANDOVER TO UTRAN COMMAND message by UE | Research In Motion UK Ltd. | imported from 3GU |
R2‑121436 | Correction to reception of HANDOVER TO UTRAN COMMAND message by UE | Research In Motion UK Ltd. | imported from 3GU |
R2‑121437 | Consideration on the mechanisms of fallback to R99 PRACH | China Unicom | imported from 3GU |
R2‑121438 | Consideration on the mechanisms of fallback to R99 PRACH | China Unicom | imported from 3GU |
R2‑121439 | Consideration on MDT QoS Measurement for UMTS | China Unicom | imported from 3GU |
R2‑121440 | Consideration on enhanced RRM with UE assistant information | China Unicom, ZTE | imported from 3GU |
R2‑121441 | Additional value for Total RLC AM Buffer Size | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121442 | Additional value for Total RLC AM Buffer Size value range | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121443 | Corrections to definitions section | Research In Motion UK Ltd. | imported from 3GU |
R2‑121444 | Handling of additionalSpectrumEmissionPCell | Huawei, HiSilicon | imported from 3GU |
R2‑121445 | Correction to the combination of physical uplink channels | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121446 | Multiflow compatibility with legacy features and UE categories | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121447 | Handling of features in FGI1 and FGI2 | Huawei, HiSilicon, Telecom Italia | imported from 3GU |
R2‑121448 | Handling of features in FGI1 and FGI2 | Huawei, HiSilicon, Telecom Italia | imported from 3GU |
R2‑121449 | Random Access Failure Handling on SCell | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121450 | Signalling approaches for bandwidth combinations | Huawei, HiSilicon | imported from 3GU |
R2‑121451 | Active time in case of Cell specific TDD configuration Inter-band Carrier Aggregation | Samsung | imported from 3GU |
R2‑121452 | Signalling approaches for bandwidth combinations-alt1 | Huawei, HiSilicon | imported from 3GU |
R2‑121453 | Signalling approaches for bandwidth combinations-alt2 | Huawei, HiSilicon | imported from 3GU |
R2‑121454 | Active time in case of Cell specific TDD configuration Inter-band Carrier Aggregation in case of Half Duplex Mode | Samsung | imported from 3GU |
R2‑121455 | Clarification of the Security Mode Command procedure in UTRAN | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121456 | Parallel Tx in same TAG | Huawei, HiSilicon | imported from 3GU |
R2‑121457 | RRC Connection Handling | Huawei, HiSilicon | imported from 3GU |
R2‑121458 | Data Volume Measurements during Congestion | Vodafone | imported from 3GU |
R2‑121459 | Consideration on MDT location information enhancements | China Unicom | imported from 3GU |
R2‑121460 | Consideration on MDT QoS Measurement | China Unicom | imported from 3GU |
R2‑121461 | PWS Terminology Alignment | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121462 | EAB information update procedure in LTE | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121463 | MSG2 Reception for SCells (Alternative B1) | Ericsson, ST-Ericsson, Nokia Corporation, Nokia Siemens Networks, ZTE, Intel, MediaTek, Samsung, Alcatel-Lucent, Qualcomm Incorporated | imported from 3GU |
R2‑121464 | Analysis of per Band Capability Reporting | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121465 | Assistance information from UE to eNB for eDDA | Samsung | imported from 3GU |
R2‑121466 | Enhanced Network Control of Mobility in CELL_FACH | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121467 | Accuracy of detailed location information | NEC | imported from 3GU |
R2‑121468 | Inter-RAT aspects of Logged MDT | NEC | imported from 3GU |
R2‑121469 | CSG reselection in CELL_FACH | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121470 | Detailed infromation from UE to eNB in the indication to inform in-device interference | Samsung | imported from 3GU |
R2‑121471 | Signaling procedure to handle in-device interference | Samsung | imported from 3GU |
R2‑121472 | Reselection Enhancements in CELL_FACH | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121473 | Measurement for mobility purpose during in-device interference | Samsung, Broadcom | imported from 3GU |
R2‑121474 | Introduction of measurements and reselection from UTRAN CELL_FACH to E-UTRAN | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121475 | Introduction of measurements and reselection from UTRAN CELL_FACH to E-UTRAN | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121476 | Introduction of measurements and reselection from UTRAN CELL_FACH to E-UTRAN | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121477 | Necessary information forwarding during handover to avoid ping-pong | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121478 | Number of TAGs | New Postcom | imported from 3GU |
R2‑121479 | Introduction of measurements and reselection from UTRAN CELL_FACH to E-UTRAN | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121480 | Introduction of measurements and reselection from UTRAN CELL_FACH to E-UTRAN | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121481 | Analysis of IDC gaps | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121482 | Autonomous denial constraints discussion | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121483 | DRX configuration retention while moving from connected to Idle | Samsung | imported from 3GU |
R2‑121484 | PUCCH improvements for Diverse Data Applications | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121485 | Reduction of logging and reporting | New Postcom | imported from 3GU |
R2‑121486 | Analysis on the accessibility measurements for MDT purpose | New Postcom | imported from 3GU |
R2‑121487 | Summary of email discussion [77#31] LTE: Hetnet Mobility: Inter-frequency small cell detection | NTT DOCOMO, INC. (Email discussion rapporteur) | imported from 3GU |
R2‑121488 | Number of RACH SCells in a STAG | New Postcom | imported from 3GU |
R2‑121489 | Draft Reply LS on Extended S-RNTI | Ericsson | imported from 3GU |
R2‑121490 | Handling of RA procedure on an SCell when PCell TAT expires | HTC | imported from 3GU |
R2‑121491 | RRC connection reestablishment in HetNet | New Postcom | imported from 3GU |
R2‑121492 | DRX Considerations in inter-band CA with different TDD ULDL configurations | New Postcom | imported from 3GU |
R2‑121493 | Considerations on Downlink Timing reference in sTAG | New Postcom | imported from 3GU |
R2‑121494 | Views on signalling requirement for reduced power ABS | Samsung | imported from 3GU |
R2‑121495 | Views on signalling requirements for CRS interference handling | Samsung | imported from 3GU |
R2‑121496 | Views on cell detection of weak pico in co-channel hetnet | Samsung | imported from 3GU |
R2‑121497 | Idle Mode enhancement for eICIC in Rel 11.0 | Samsung | imported from 3GU |
R2‑121498 | Inter-frequency eICIC enhancements for Rel 11.0 | Samsung | imported from 3GU |
R2‑121499 | Add Extending 850 MHz Upper Band (814 - 849 MHz) to TS25.307 | Alcatel-Lucent, Sprint | imported from 3GU |
R2‑121500 | Implicit release timer for standalone HS-DPCCH transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121501 | RAN2 input for TR37.803 on Enhanced HNB mobility in CELL_FACH | Alcatel-Lucent | imported from 3GU |
R2‑121502 | AICH Indication for 2/10 ms TTI concurrent deployment in CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121503 | Response LS on Clarifications on solutions for 3G macro to femto hand-in for non-CSG Ues | Alcatel-Lucent | imported from 3GU |
R2‑121504 | Way forward for PRACH fallback for enhanced CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Interdigital, Broadcom Corporation | imported from 3GU |
R2‑121505 | Detection of system information modification | Samsung | imported from 3GU |
R2‑121506 | Correction of SRB1 mapping info for FACH | Alcatel-Lucent, Broadcom Corporation | imported from 3GU |
R2‑121507 | PRACH fallback indication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121508 | Measured Results on RACH | Alcatel-Lucent | imported from 3GU |
R2‑121509 | Discussion on per-HARQ process grant in CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121510 | Further Enhanced UE DRX | Alcatel-Lucent | imported from 3GU |
R2‑121511 | Increasing range of S-RNTI | Alcatel-Lucent | imported from 3GU |
R2‑121512 | Signalling Additional Traffic Information for Improved RRC | NEC | imported from 3GU |
R2‑121513 | Signalling Additional Traffic Information for Improved RRC | NEC | imported from 3GU |
R2‑121514 | Interaction of CPC, activation/deactivation orders and eSCC with Multiflow HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121515 | Discussion on event triggers for assisted cell selection in Multiflow HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121516 | DRX during UL scheduling | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121517 | Further discussion on UE assisted DRX configuration | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121518 | UE request to activate/deactivate uplink CLTD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121519 | MDT measurements - data volume for LTE | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121520 | Analysis of RRC connection handling | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121521 | eMDT Throughput measurements per UE or RAB QoS class(es) in LTE | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121522 | Power consumption in idle and connected state DRX | Nokia Corporation | imported from 3GU |
R2‑121523 | Introduction of a CSFB Indicator in RRC Connection Request | Vodafone, Teliasonera, Alcatel-Lucent, Huawei | imported from 3GU |
R2‑121524 | CSG/hybrid cells reselection in CELL_FACH | Nokia Siemens Networks | imported from 3GU |
R2‑121525 | Details on IDC indication | Nokia Corporation | imported from 3GU |
R2‑121526 | Fallback to R99 RACH | Nokia Siemens Networks | imported from 3GU |
R2‑121527 | Positioning uncertainty and confidence for MDT | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121528 | Pathloss reference configuration | ITRI | imported from 3GU |
R2‑121529 | Discussion on whether to stop RA procedure when RA failure occurs | ITRI | imported from 3GU |
R2‑121530 | Deactivation of Timing Reference SCell in sTAG | ITRI | imported from 3GU |
R2‑121531 | Where to Provide MBMS Assistant Information in RAN | ITRI | imported from 3GU |
R2‑121532 | Discussion on UE behaviour if the Interested MBMS is not provided | ITRI | imported from 3GU |
R2‑121533 | Discussion on EAB information update procedure | ITRI | imported from 3GU |
R2‑121534 | Discussion on EAB requirement and procedure | ITRI | imported from 3GU |
R2‑121535 | Efficient SR resource allocation on PUCCH | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121536 | Mobility State Estimation Enhancements | Samsung | imported from 3GU |
R2‑121537 | Pico to Macro Failure Improvements | Samsung | imported from 3GU |
R2‑121538 | Pico cell detection issues | Samsung | imported from 3GU |
R2‑121539 | Multiplexing options for SRB1 in enhanced CELL_FACH | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121540 | Location Information for QoS measurements | NTT DOCOMO, INC. | imported from 3GU |
R2‑121541 | Providing UE Speed assistance to the eNB | Samsung | imported from 3GU |
R2‑121542 | Reporting triggers for Immediate MDT | NTT DOCOMO, INC. | imported from 3GU |
R2‑121543 | Alternatives on the CA bandwidth combination issue | NTT DOCOMO, INC. | imported from 3GU |
R2‑121544 | Broadcast channel coverage optimisation | NTT DOCOMO, INC. | imported from 3GU |
R2‑121545 | Relevance of PUCCH resource optimisation for background traffic | Samsung | imported from 3GU |
R2‑121546 | CSI measurements for MDT QoS verification use case | NTT DOCOMO, INC. | imported from 3GU |
R2‑121547 | CLTD activation/deactivation | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121548 | Further discussion on EAB information update | CATR | imported from 3GU |
R2‑121549 | Corrections and Clarifications on UTRA related FGIs | CATT | imported from 3GU |
R2‑121550 | On Retaining RRC Context | IPWireless Inc. | imported from 3GU |
R2‑121551 | Corrections and Clarifications on UTRA related FGIs | CATT | imported from 3GU |
R2‑121552 | Initial TA value | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121553 | RLF and RLM on SCells | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121554 | MBMS assistance information and RRC signaling details | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121555 | MBMS UE capability extensions | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121556 | Draft TP on Introduction of Extended Access Barring | Samsung | imported from 3GU |
R2‑121557 | Summary of e-mail discussion [77#26] LTE: CA: Timing reference for SCell-only TA groups | Ericsson | imported from 3GU |
R2‑121558 | Timing Advance Maintenance for SCells | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121559 | Timing reference for SCells | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121560 | MBMS interest indication and RRC signaling details | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121561 | MBMS Service continuity and CSG | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121562 | Handling of RA procedure on an SCell when PCell TAT expires | HTC | imported from 3GU |
R2‑121563 | Clarification of Timing Advance adjustment delay requirements | HTC | imported from 3GU |
R2‑121564 | Clarification of Timing Advance adjustment delay requirements | HTC | imported from 3GU |
R2‑121565 | Invalidation of ETWS with security feature | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121566 | Invalidation of ETWS with security feature | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121567 | PWS terminology in RAN2 | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121568 | Change in Scheduling Information for ETWS | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121569 | Change in Scheduling Information for CMAS | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121570 | HCS and absolute priority based cell reselection | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121571 | Clarification for HCS and absolute priority based cell reselection | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121572 | Continuation of MDT upon PLMN change | Samsung | imported from 3GU |
R2‑121573 | IDC indication configuration and reporting | NEC | imported from 3GU |
R2‑121574 | Preservation of CS call during RLC unrecoverable error in multiRAB environment | Research In Motion UK Ltd. | imported from 3GU |
R2‑121575 | Inter-band SCell Activation PHR Triggering | InterDigital Communications | imported from 3GU |
R2‑121576 | Delay in checking SRB 1-4 mapping on PCH to FACH transition | Research In Motion UK Ltd. | imported from 3GU |
R2‑121577 | CDMA2000 interworking in shared RAN | NEC | imported from 3GU |
R2‑121578 | Inter-band PL and P-MPR PHR Triggering | InterDigital Communications | imported from 3GU |
R2‑121579 | Clarification for HCS and absolute priority based cell reselection | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121580 | Pcmax Inclusion for Inter-band PHR | InterDigital Communications | imported from 3GU |
R2‑121581 | Autonomous state transition between the UTRA RRC states | Nokia Siemens Networks, Deutsche Telekom | imported from 3GU |
R2‑121582 | Capability signaling for DB-DC-HSDPA with MIMO | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121583 | Restricting Frequency and Limiting Impact of Autonomous Denials | InterDigital Communications | imported from 3GU |
R2‑121584 | Clarification of capability signaling for UE supporting DB-DC-HSDPA with MIMO | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121585 | Open issues on HS-DSCH DRX operation with second DRX cycle | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121586 | PS RAB unrecoverable error in the multi-RAB configuration | Nokia Siemens Networks | imported from 3GU |
R2‑121587 | Introduction of HS-DSCH DRX operation with second DRX cycle | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121588 | Introduction of HS-DSCH DRX operation with second DRX cycle | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121589 | Introduction of HS-DSCH DRX operation with second DRX cycle | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121590 | Frequency specific compressed mode for the non-adjacent carrier allocation | Nokia Siemens Networks | imported from 3GU |
R2‑121591 | Frequency specific compressed mode for the non-adjacent carrier allocation | Nokia Siemens Networks | imported from 3GU |
R2‑121592 | Introduction of HS-DSCH DRX operation with second DRX cycle | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121593 | Considerations on FE-FACH sub-feature dependencies | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121594 | Pcmax Inclusion for Inter-band PHR | InterDigital Communications | imported from 3GU |
R2‑121595 | Handover into CSG for non-CSG UEs | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121596 | Introduction of cell update-less RLC/PDCP unrecoverable error reporting | Renesas Mobile Europe Ltd, Alcatel-Lucent | imported from 3GU |
R2‑121597 | Introduction of cell update-less RLC/PDCP unrecoverable error reporting and recovery | Renesas Mobile Europe Ltd, Alcatel-Lucent | imported from 3GU |
R2‑121598 | Report e-mail discussion [77#23] - Joint: MDT Accessibility Measurements | Ericsson | imported from 3GU |
R2‑121599 | Introduction of cell update-less RLC/PDCP unrecoverable error reporting and recovery | Renesas Mobile Europe Ltd, Alcatel-Lucent | imported from 3GU |
R2‑121600 | On the definition of a UMTS throughput measurement | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121601 | Definition of delay sensitive QoS experience measurement | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121602 | HSDPA multiflow capability signalling | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121603 | HSDPA multiflow capability signalling | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121604 | New carrier type and power imbalance | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R2‑121605 | Accessibility measurements for MDT | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121606 | HSDPA multiflow mobility | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121607 | Signaling procedures for IDC avoidance | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121608 | HSDPA multiflow skew issue | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121609 | A Framework for Management of Background Traffic UEs | Research In Motion UK Ltd. | imported from 3GU |
R2‑121610 | Text proposal for TR 36.822: UE power consumption and DRX | Research In Motion UK Ltd. | imported from 3GU |
R2‑121611 | Text proposal for TR 36.822: Resource usage for SR | Research In Motion UK Ltd. | imported from 3GU |
R2‑121612 | L2 signalling associated with data transmission | Huawei, HiSilicon | imported from 3GU |
R2‑121613 | Performance of DRX in RRC connected compared to idle | Huawei, HiSilicon | imported from 3GU |
R2‑121614 | Handling of UEs with background or IM traffic | Huawei, HiSilicon | imported from 3GU |
R2‑121615 | Open issues for MBMSInterestIndication | Huawei, HiSilicon | imported from 3GU |
R2‑121616 | [77#28] LTE: MBMS frequency information in USD | Huawei | imported from 3GU |
R2‑121617 | Network assistance for CRS Interference Cancellation | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121618 | Idle mode UE RRM measurement restrictions for eICIC | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121619 | HetNet Mobility in non-DRX environment | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121620 | UE MSE based inter-frequency measurements | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121621 | Small cell signal based control of inter-frequency measurements | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121622 | Draft update of the stage 2 running CR on service continuity for MBMS for LTE | Huawei | imported from 3GU |
R2‑121623 | Efficient small cell detection background search | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121624 | Improved Mobility State Estimation | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121625 | Introduction of service continuity for MBMS for LTE | Huawei | imported from 3GU |
R2‑121626 | Evaluation of UE MSE and Hetnet Mobility | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121627 | Introduction of service continuity for MBMS for LTE | Huawei | imported from 3GU |
R2‑121628 | Re-establishment issues in HetNet scenarios | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R2‑121629 | DRX enhancements for predictable TDM solution | Qualcomm Incorporated | imported from 3GU |
R2‑121630 | DRX enhancements for predictable TDM solution | Qualcomm Incorporated | imported from 3GU |
R2‑121631 | SI transmission during contention resolution | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121632 | Inbound mobility to shared CSG cell | Samsung | imported from 3GU |
R2‑121633 | UE processing capability and MBMSInterestIndication | Alcatel-Lucent | imported from 3GU |
R2‑121634 | Remaining issues on provisioning of MBMS SAIs in the RAN | Alcatel-Lucent | imported from 3GU |
R2‑121635 | Report of Email Discussion [77#25] LTE CA: MSG2 location for SCell RA | InterDigital Communications | imported from 3GU |
R2‑121636 | UE behaviour if SAIs in SI is not provided | Alcatel-Lucent | imported from 3GU |
R2‑121637 | Congestion and admission control | Alcatel-Lucent | imported from 3GU |
R2‑121638 | MSG2 Reception for SCells (Alternative B3) | InterDigital Communications, Renesas Mobile Europe, Huawei, HiSilicon, LG Electronics Inc., CATT, Pantech, Potevio, ITRI, Panasonic, NTT DoCoMo | imported from 3GU |
R2‑121639 | Issues regarding support of MBMS service continuity and CSG cells | Alcatel-Lucent | imported from 3GU |
R2‑121640 | Different TDD configurations in inter-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121641 | Enhancement for SR procedure by connected UEs | Alcatel-Lucent | imported from 3GU |
R2‑121642 | Introduction of UE support for inbound mobility to a shared CSG cell | Samsung | imported from 3GU |
R2‑121643 | UE assisted information and its requirements | Alcatel-Lucent | imported from 3GU |
R2‑121644 | Measurements and triggers for IDC indication | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121645 | Measurements and triggers for IDC indication | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121646 | Measurement Configuration for CSI-RS Based Measurement for CoMP | Huawei, HiSilicon | imported from 3GU |
R2‑121647 | Clarification of mch-SchedulingPeriod configuration | Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Samsung | imported from 3GU |
R2‑121648 | Clarification on MCCH configuration | Alcatel-Lucent, Ericsson, Nokia Siemens Networks | imported from 3GU |
R2‑121649 | DRX and IDC gaps for IDC interference avoidance | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121650 | Autonomous denials for rare signaling | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121651 | Clarification of MBMS stage 2 agreements | Samsung | imported from 3GU |
R2‑121652 | Discussion on Location information availability with MDT | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121653 | On the impact to legacy UEs due to Static Fallback to R99 Scheme | Qualcomm Incorporated | imported from 3GU |
R2‑121654 | Using UE speed information for MDT | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121655 | A dynamic mechanism for Fallback to Rel-99 PRACH | Qualcomm Incorporated | imported from 3GU |
R2‑121656 | Discussion on Rel-11 eICIC assistance signalling | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121657 | TP on Clarification of MBMS stage 2 agreements | Samsung | imported from 3GU |
R2‑121658 | Using DRX with eICIC | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121659 | Monitoring the Paging Indicator channel in CELL_FACH | Qualcomm Incorporated | imported from 3GU |
R2‑121660 | Impact of DRX to HetNet Mobility Performance | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121661 | Way forward with EAB SIB update for LTE | Ericsson, ST-Ericsson, MediaTek, Renesas Mobile Europe, ZTE, CATT, Vodafone, Huawei, HiSilicon, Intel | imported from 3GU |
R2‑121662 | Impact of Rel'10 eICIC to Hetnet mobility performance | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121663 | Open Issues on concurrent deployment of 2ms and 10ms TTI in a cell in CELL_FACH | Qualcomm Incorporated | imported from 3GU |
R2‑121664 | Discussion on Inter-frequency small-cell discovery | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121665 | Using proximity indication for small-cell discovery | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121666 | MBMS service continuity for non-MBMS cells (including CSG) | Samsung | imported from 3GU |
R2‑121667 | MBMS service continuity for non-MBMS cells (including CSG) | Samsung | imported from 3GU |
R2‑121668 | E-DCH resource analysis | Qualcomm Incorporated | imported from 3GU |
R2‑121669 | On improvements to mobility state estimation | Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121670 | Summary of email discussion [77#33] LTE: Mobility State Estimation Enhancements | Rapporteur (Renesas Mobile Europe Ltd.) | imported from 3GU |
R2‑121671 | Introduction of Further Enhancements to CELL_FACH in 25.308 | Qualcomm Incorporated | imported from 3GU |
R2‑121672 | Introduction of Further Enhancements to CELL_FACH in 25.319 | Qualcomm Incorporated | imported from 3GU |
R2‑121673 | [77#29] - MBMS congestion handling | Samsung | imported from 3GU |
R2‑121674 | RAN2 specification impact due to the introduction of Further Enhancements to CELL_FACH | Qualcomm Incorporated | imported from 3GU |
R2‑121675 | Enabling Closed Loop Antenna Switching | Qualcomm Incorporated | imported from 3GU |
R2‑121676 | Handling of congested MBMS frequecy | Samsung | imported from 3GU |
R2‑121677 | Signaling design to Enable and Disable CLTD | Qualcomm Incorporated | imported from 3GU |
R2‑121678 | MAC Layer aspects of UL MIMO | Qualcomm Incorporated | imported from 3GU |
R2‑121679 | Common Relative Grant for Interference Control in CELL_FACH | Qualcomm Incorporated | imported from 3GU |
R2‑121680 | MBMS convergence and dispersion (including CSG) | Samsung | imported from 3GU |
R2‑121681 | UE status reporting | Samsung | imported from 3GU |
R2‑121682 | Introducing support for multi-bands cells | Samsung | imported from 3GU |
R2‑121683 | Comments on SCell RACH solutions | Motorola Mobility | imported from 3GU |
R2‑121684 | SCell RACH Solution B3 | Motorola Mobility | imported from 3GU |
R2‑121685 | Other solution direction for coping with difficult radio environments | Samsung | imported from 3GU |
R2‑121686 | Restrictions on Autonomous denial | Motorola Mobility | imported from 3GU |
R2‑121687 | DRX operation in inter-band TDD CA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121688 | Pathloss reference for SCell TA group and need of RLM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121689 | Comparison of EAB parameter update solutions | Alcatel-Lucent | imported from 3GU |
R2‑121690 | Timing reference for SCell TA group | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121691 | Positioning solutions for MDT | Alcatel-Lucent | imported from 3GU |
R2‑121692 | ePLMN handling for MDT and RLF in Rel-11 | Alcatel-Lucent | imported from 3GU |
R2‑121693 | Parallel transmissions of PRACH and PUCCH/PUSCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121694 | DRX or Gap mechanism for IDC TDM solution | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121695 | CDMA interworking in shared LTE networks | Alcatel-Lucent, Clearwire | imported from 3GU |
R2‑121696 | IDC Indication signalling procedure | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121697 | IDC Information forwarding | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121698 | Considerations on dynamic R99 RACH fallback scheme | InterDigital Communications | imported from 3GU |
R2‑121699 | Measurement for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R2‑121700 | Discussion on Mobility for multiflow operation | InterDigital Communications | imported from 3GU |
R2‑121701 | CGI reporting in FGIs | Qualcomm Incorporated | imported from 3GU |
R2‑121702 | CGI reporting in FGIs | Qualcomm Incorporated | imported from 3GU |
R2‑121703 | On the clarifications for 3G Macro to Femto hand-in solutions for non-CSG UEs | Qualcomm Incorporated | imported from 3GU |
R2‑121704 | RRC Container at Handover from GERAN to E-UTRAN | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121705 | DL SPS HARQ process ID issue when SFN wraps around | Broadcom Corporation | imported from 3GU |
R2‑121706 | Revised Email discussion: [76#20] - LTE: HetNet mobility calibration simulations | Alcatel-Lucent (Rapporteur) | imported from 3GU |
R2‑121707 | UE speed-based methods and mobility state estimation for improving the mobility performance in HetNets | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121708 | Evaluation of Mobility Performance in HetNet with ABS at Macro Cells | Alcatel-Lucent | imported from 3GU |
R2‑121709 | On Network-Assisted Inter-frequency Pico Cell Discovery in LTE HetNets | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121710 | Discussion on Context Fetch for RRC Connection Re-establishment in HetNets | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑121711 | Random Access Failures Handling on SCells | Potevio | imported from 3GU |
R2‑121712 | Timing reference for sTAG | Samsung | imported from 3GU |
R2‑121713 | Considerations on timing reference change for sTAG | Potevio | imported from 3GU |
R2‑121714 | Considerations on timing reference change for sTAG | Potevio | imported from 3GU |
R2‑121715 | Considerations on deactivation timer handling for RA SCell | Potevio | imported from 3GU |
R2‑121716 | Discussions on CoMP architecture and CoMP Set Management Measurement | Samsung | imported from 3GU |
R2‑121717 | Enhancement to high speed UEs in HetNet | Potevio | imported from 3GU |
R2‑121718 | Mobility state reporting | Potevio | imported from 3GU |
R2‑121719 | Considerations on HO-Region specific parameters adjusting | Potevio | imported from 3GU |
R2‑121720 | Intra-frequency small cell detection in HetNet | Potevio | imported from 3GU |
R2‑121721 | Further discussion on the open issues of RACH on SCell | Intel Corporation | imported from 3GU |
R2‑121722 | Signalling Additional Traffic Information for Improved RRC | NEC | imported from 3GU |
R2‑121723 | Remaining issues on Timing reference for sTAG | Intel Corporation | imported from 3GU |
R2‑121724 | Remaining issues on Timing reference for sTAG | Intel Corporation | imported from 3GU |
R2‑121725 | PHR transmission in multiple TA | Intel Corporation | imported from 3GU |
R2‑121726 | DRX operation for different UL/DL configuration in TDD | Intel Corporation | imported from 3GU |
R2‑121727 | Triggering for in-device coexistence | Intel Corporation | imported from 3GU |
R2‑121728 | E-UTRA capability handling for dual mode UEs (FDD/TDD) in Rel-10 | Clearwire | imported from 3GU |
R2‑121729 | Signaling procedure for in-device coexistence | Intel Corporation | imported from 3GU |
R2‑121730 | TDM solutions for in-device coexistence | Intel Corporation | imported from 3GU |
R2‑121731 | HetNet mobility performance with DRX | Intel Corporation | imported from 3GU |
R2‑121732 | Further considerations for EAB update mechanism | CATT | imported from 3GU |
R2‑121733 | Correction of 8C-HSDPA fallback to 4C-HSDPA | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd. | imported from 3GU |
R2‑121734 | Overview of RAN2 Impact in Four Branch MIMO | Ericsson | imported from 3GU |
R2‑121735 | Voice over PS continuity | Qualcomm Incorporated | imported from 3GU |
R2‑121736 | Voice over PS continuity | Qualcomm Incorporated | imported from 3GU |
R2‑121737 | UE categories for Four Branch MIMO | Ericsson | imported from 3GU |
R2‑121738 | MAC-ehs Operation with 2 Codeword in Four Branch MIMO | Ericsson | imported from 3GU |
R2‑121739 | Corrections regarding the behaviours of H-RNTI stored in CELL_PCH state | Qualcomm Incorporated, Broadcom | imported from 3GU |
R2‑121740 | Transport blocks selection with 2 Codeword in Four Branch MIMO | Ericsson | imported from 3GU |
R2‑121741 | MAC Layer aspects for MIMO with 64QAM for HSUPA | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121742 | Mobility performance enhancements in HetNet | Intel Corporation | imported from 3GU |
R2‑121743 | Impact of random pico cell deployment on the performance | Intel Corporation | imported from 3GU |
R2‑121744 | Mobility performance enhancements using RSRP | Intel Corporation | imported from 3GU |
R2‑121745 | RACH usage for background traffic | Intel Corporation | imported from 3GU |
R2‑121746 | Support for UE Assistance Information for eDDA | Intel Corporation | imported from 3GU |
R2‑121747 | Evaluation of UE Power Consumption and Latency using DRX Parameters Switching | Intel Corporation | imported from 3GU |
R2‑121748 | Further evaluation of EAB information update mechanism with NAS backoff | Intel Corporation | imported from 3GU |
R2‑121749 | Configuration of CSI-RS Based RRM Measurement | Intel Corporation | imported from 3GU |
R2‑121750 | Discussion on UE initiated activation/deactivation request | Intel Corporation | imported from 3GU |
R2‑121751 | IRAT prioritization for FE-FACH absolute priority cell reselection | Qualcomm Incorporated | imported from 3GU |
R2‑121752 | Introduction of FE-FACH absolute priority cell reselection in 25.304 | Qualcomm Incorporated | imported from 3GU |
R2‑121753 | On FE-FACH absolute priority cell reselection | Qualcomm Incorporated | imported from 3GU |
R2‑121754 | Earlier implementability of MF-HSDPA | Qualcomm Incorporated | imported from 3GU |
R2‑121755 | On MF-HSDPA configurations | Qualcomm Incorporated | imported from 3GU |
R2‑121756 | On Intra-nodeB MF-HSDPA pre-configuration and NodeB control via L1 orders | Qualcomm Incorporated | imported from 3GU |
R2‑121757 | Event based Virtual Active Set reporting for MF-HSDPA | Qualcomm Incorporated | imported from 3GU |
R2‑121758 | Optimizing RNC-based RLC split performance | Qualcomm Incorporated | imported from 3GU |
R2‑121759 | Enhanced RRC redirection to E-UTRAN | Qualcomm Incorporated | imported from 3GU |
R2‑121760 | PWS support in RAN2 | Huawei, HiSilicon | imported from 3GU |
R2‑121761 | PWS support in RAN2 | Huawei, HiSilicon | imported from 3GU |
R2‑121762 | PWS support in RAN2 | Huawei, HiSilicon | imported from 3GU |
R2‑121763 | PWS support in RAN2 | Huawei, HiSilicon | imported from 3GU |
R2‑121764 | PWS support in RAN2 | Huawei, HiSilicon | imported from 3GU |
R2‑121765 | PWS support in RAN2 | Huawei, HiSilicon | imported from 3GU |
R2‑121766 | Assistant information for IDC indication | LG Electronics Inc. | imported from 3GU |
R2‑121767 | IDC considering CA | LG Electronics Inc. | imported from 3GU |
R2‑121768 | Limitation of sending IDC indication | LG Electronics Inc. | imported from 3GU |
R2‑121769 | Necessary procedure for avoiding ping-pong to problematic frequency | LG Electronics Inc. | imported from 3GU |
R2‑121770 | Mobility procedure considering IDC interference | LG Electronics Inc. | imported from 3GU |
R2‑121771 | Overall IDC signaling procedure | LG Electronics Inc. | imported from 3GU |
R2‑121772 | Congestion handling of MBMS cell | LG Electronics Inc. | imported from 3GU |
R2‑121773 | MBMS Service Continuity for Inter-RAT Mobility | LG Electronics Inc. | imported from 3GU |
R2‑121774 | Benefits of UE role in selecting DRX parameters | Qualcomm Incorporated | imported from 3GU |
R2‑121775 | mobility related parameters scaling based on cell type | LG Electronics Inc. | imported from 3GU |
R2‑121776 | Discussion on signaling support for CRS interference handling | Qualcomm Incorporated | imported from 3GU |
R2‑121777 | Further considerations on inter-site DTX/DRX with HSDPA Multiflow | Nokia Siemens Networks, InterDigital Communications | imported from 3GU |
R2‑121778 | Signaling support for CRS interference handling | Qualcomm Incorporated | imported from 3GU |
R2‑121779 | Report of [7#22] Joint: MDT: Location Information | LG Electronics Inc. | imported from 3GU |
R2‑121780 | On a way forward with the skew handling for HSDPA Multiflow | Nokia Siemens Networks, Ericsson, ST-Ericsson, InterDigital Communications | imported from 3GU |
R2‑121781 | Consideration for Location Availability | LG Electronics Inc. | imported from 3GU |
R2‑121782 | MDT Location Enhancement in Rel-11 | LG Electronics Inc. | imported from 3GU |
R2‑121783 | Skew handling for HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R2‑121784 | Positioning Status Reporting | LG Electronics Inc. | imported from 3GU |
R2‑121785 | On-demand positioning for MDT | LG Electronics Inc. | imported from 3GU |
R2‑121786 | Inter-RAT MDT | LG Electronics Inc. | imported from 3GU |
R2‑121787 | Inter-frequency measurement for small cell detection | LG Electronics Inc. | imported from 3GU |
R2‑121788 | Simple MSE enhancement | LG Electronics Inc. | imported from 3GU |
R2‑121789 | Re-direction to E-UTRA issues | Ericsson, ST-Ericsson, NTT Docomo, TeliaSonera, AT&T, Softbank Mobile | imported from 3GU |
R2‑121790 | RRC Connection Release with redirection: search time and searched frequencies | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121791 | RAN2 related issues on stand-alone HS-DPCCH | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121792 | TTI network indication | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd, Nokia Siemens Networks | imported from 3GU |
R2‑121793 | Fallback to R99 PRACH | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd, Nokia Siemens Networks | imported from 3GU |
R2‑121794 | FE-FACH: Support for per-HARQ-process activation | Ericsson, ST-Ericsson, Orange, AT&T, Softbank Mobile, Telefonica | imported from 3GU |
R2‑121795 | Per-HARQ process activation in CELL_FACH and Idle Mode state | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121796 | Network controlled mobility in CELL_FACH state | Ericsson, ST-Ericsson | imported from 3GU |
R2‑121797 | Network-controlled autonomous denial | Fujitsu | imported from 3GU |
R2‑121798 | Further consideration on the TAG change procedure | Fujitsu | imported from 3GU |
R2‑121799 | Reaching PREAMBLE_TRANS_MAX | Fujitsu | imported from 3GU |
R2‑121800 | RA procedure after SCell deactivation | Fujitsu | imported from 3GU |
R2‑121801 | Handling the new TAC | Fujitsu | imported from 3GU |
R2‑121802 | Discussion on CoMP measurement set Management | Fujitsu | imported from 3GU |
R2‑121803 | On the benefits of DC-HSDPA operation in CELL_FACH state | Huawei, HiSilicon | imported from 3GU |
R2‑121804 | Clarifications on the periodic measurement reprot for DC-HSUPA(R9) | Huawei, HiSilicon | imported from 3GU |
R2‑121805 | Support of cell selection and reselection to a shared CSG cell | Huawei, HiSilicon | imported from 3GU |
R2‑121806 | Discussion on CELL_FACH mobility enhancement to LTE | Huawei, HiSilicon | imported from 3GU |
R2‑121807 | Clarifications on the event measurement report for DC-HSUPA(R9) | Huawei, HiSilicon | imported from 3GU |
R2‑121808 | Correction to the secondary uplink frequency activation state after reconfiguration procedure (Rel-9) | Huawei, HiSilicon | imported from 3GU |
R2‑121809 | Consideration on the open issues for 2ms and 10ms concurrent deployment in CELL FACH state | Huawei, HiSilicon | imported from 3GU |
R2‑121810 | Further consideration on TTI selection criteria | Huawei, HiSilicon | imported from 3GU |
R2‑121811 | Further analysis on standalone HS-DPCCH | Huawei, HiSilicon | imported from 3GU |
R2‑121812 | Further analysis on CELL_FACH DRX | Huawei, HiSilicon | imported from 3GU |
R2‑121813 | Signature partition and sub-feature dependency in FE-FACH | Huawei, HiSilicon | imported from 3GU |
R2‑121814 | Discussion on standalone per-HARQ grant processing | Huawei, HiSilicon | Disc |
R2‑121815 | Further considerations on TTI alignmen&tper HARQ scheduling for between CELL_FACH UEs and CELL_DCH Ues | Huawei, HiSilicon | Disc |
R2‑121816 | Excluding CSG cells in inter&intra-freq detect set operation | Huawei, HiSilicon | CR |
R2‑121817 | Discussion on CELL_FACH enhancement | Huawei, HiSilicon | Disc |
R2‑121818 | TTI indication for 2ms 10ms concurrent deployment in CELL FACH state | Huawei, HiSilicon | Disc |
R2‑121819 | Corrections on DSAC and PPAC(R8) | Huawei, HiSilicon | CR |
R2‑121820 | Further considerations on standalone HS-DPCCH | Huawei, HiSilicon | Disc |
R2‑121821 | Inter-site multiflow with DRX feature | Huawei, HiSilicon | Disc |
R2‑121822 | Considerations on UE multiflow capability | Huawei, HiSilicon | Disc |
R2‑121823 | Further considerations on multiflow | Huawei, HiSilicon | Disc |
R2‑121824 | Multiflow and enhanced serving cell change | Huawei, HiSilicon | Disc |
R2‑121825 | Reconfiguration messages and HS-SCCH orders interaction for HS-SCCH less | Huawei, HiSilicon | CR |
R2‑121826 | Continuous collision between Paging/SI and Measurement gap | Panasonic | Disc |
R2‑121827 | Continuous collision between Paging and Measurement gap | Panasonic | CR |
R2‑121828 | Clarification on default radio configuration in CELL_FACH | Panasonic | CR |
R2‑121829 | Clarification on default radio configuration in CELL_FACH | Panasonic | CR |
R2‑121830 | Clarification on default radio configuration in CELL_FACH | Panasonic | CR |
R2‑121831 | Signalling Additional Traffic Information for Improved RRC | NEC | Disc |
R2‑121832 | Discussion of UM RLC ciphering error detection and recovery for VoIP | Renesas Mobile Europe Ltd. | Disc |
R2‑121833 | SCell deactivation during random access procedure | HTC | Disc |
R2‑121834 | Clarification on MCCH information validity | HTC | CR |
R2‑121835 | Clarification on MCCH information validity | HTC | CR |
R2‑121836 | TAC reception after TAT expiry | HTC | Disc |
R2‑121837 | Discussion of cell selection and reselection to a shared CSG cell | Huawei, HiSilicon | Disc |
R2‑121838 | Requirement of measurement subframe restriction for eICIC with CA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Disc |
R2‑121839 | Connected mode paging enhancement | Alcatel-Lucent | Disc |
R2‑121840 | Enhanced radio resource allocation for diverse data applications | Alcatel-Lucent | Disc |
R2‑121841 | About usage of speed for UE selection | NEC | Disc |
R2‑121842 | PWS Terminology Alignment (CMAS/KPAS) | Renesas Mobile Europe Ltd | CR |
R2‑121843 | PWS Terminology Alignment (CMAS/KPAS/EU-Alert) | Renesas Mobile Europe Ltd | CR |
R2‑121844 | RRC Container at Handover from GERAN to E-UTRAN | Ericsson, ST-Ericsson | Disc |
R2‑121845 | Voice over PS continuity | Qualcomm Incorporated | CR |
R2‑121846 | Voice over PS continuity | Qualcomm Incorporated | CR |
R2‑121847 | TAG Composition and related aspects | Panasonic | Disc |
R2‑121848 | Views on signalling requirement for reduced power ABS | Samsung | Disc |
R2‑121849 | On MF-HSDPA configurations | Qualcomm Incorporated | Disc |
R2‑121850 | Summary of email discussion [77#33] LTE: Mobility State Estimation Enhancements | Rapporteur (Renesas Mobile Europe Ltd.) | Report |
R2‑121851 | Discussion on event triggers for assisted cell selection in Multiflow HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Disc |
R2‑121852 | Report of [7#22] Joint: MDT: Location Information | LG Electronics Inc. | Report |
R2‑121853 | Further considerations on the 2nd DRX cycle for CELL_FACH | Nokia Siemens Networks | Disc |
R2‑121854 | MSG2 Reception for SCells (Alternative B1) | Ericsson, ST-Ericsson, Nokia Corporation, Nokia Siemens Networks, ZTE, Intel, MediaTek, Samsung, Alcatel-Lucent, Qualcomm Incorporated | CR |
R2‑121855 | Evaluation on DRX and Dormancy Timer for Background Traffic and IM Traffic | CATT | Disc |
R2‑121856 | [77#28] LTE: MBMS frequency information in USD | Huawei | Report |
R2‑121857 | SR-VCC radio bearer combination | Nokia Siemens Networks, Nokia Corporation | CR |
R2‑121858 | Invalidation of ETWS with security feature | Ericsson, ST-Ericsson | CR |
R2‑121859 | Invalidation of ETWS with security feature | Ericsson, ST-Ericsson | CR |
R2‑121860 | Draft LS on RRC Container at Handover from GERAN to E-UTRAN (to: GERAN; cc: -; contact: Ericsson) | Ericsson | LSout |
R2‑121861 | Draft LS on NAS/AS interaction for EAB (to: CT1; cc: -; contact: Huawei) | Huawei | LSout |
R2‑121862 | Draft LS on MDT PLMN list (to: RAN3; cc: SA5; contact: NSN) | NSN | LSout |
R2‑121863 | Draft LS on UL power headroom for MDT (to: RAN3; cc: -; contact: Huawei) | Huawei | LSout |
R2‑121864 | Clarification of mch-ScehdulingPeriod configuration | Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Samsung | CR |
R2‑121865 | Introducing means to signal different REL-10 FDD/TDD Capabilities/FGIs for Dual-xDD UE | Samsung | CR |
R2‑121866 | Handling of features in FGI1 and FGI2 | Huawei, HiSilicon, Telecom Italia | CR |
R2‑121867 | Handling of features in FGI1 and FGI2 | Huawei, HiSilicon, Telecom Italia | CR |
R2‑121868 | MSG2 Reception for SCells (Alternative B3) | InterDigital Communications, Renesas Mobile Europe, Huawei, HiSilicon, LG Electronics Inc., CATT, Pantech, Potevio, ITRI, Panasonic, NTT DoCoMo, RIM, Panasonic | CR |
R2‑121869 | MSG2 Reception for SCells | Ericsson | CR |
R2‑121870 | Further analysis on standalone HS-DPCCH | Huawei, HiSilicon | Disc |
R2‑121871 | Corrections on DSAC and PPAC(R8) | Huawei, HiSilicon | CR |
R2‑121872 | Open issues on HS-DSCH DRX operation with second DRX cycle | Ericsson, ST-Ericsson | Disc |
R2‑121873 | SI attachment during DCCH/DTCH EUL transmission in CELL_FACH state | Ericsson, ST-Ericsson, Broadcom Corporation, ZTE | CR |
R2‑121874 | Total E-DCH buffer size in case of CCCH transmission | Ericsson, ST-Ericsson, ZTE | CR |
R2‑121875 | Correction to definition of enhanced inter-frequency measurements without CM | ZTE | CR |
R2‑121876 | Correction of ANR handlings upon UE detach or switch off | ZTE, Huawei, China Unicom, Telia Sonera | CR |
R2‑121877 | On MF-HSDPA configurations | Qualcomm Incorporated, China Unicom | Disc |
R2‑121878 | Corrections regarding the UE behaviour on evaluating the variable HSPA_RNTI_STORED_CELL_PCH | Qualcomm Incorporated, Broadcom Corporation | CR |
R2‑121879 | Clarifications of the UE behaviours when initiating a cell update procedure for 1.28Mcps TDD | Qualcomm Incorporated, Ericsson | CR |
R2‑121880 | Extend the carrier capability for two-carrier HSDPA for 1.28Mcps TDD | Qualcomm Incorporated. CATT, TD Tech, ZTE, Ericsson, ST-Ericsson | CR |
R2‑121881 | Extend the carrier capability for two-carrier HSDPA for 1.28Mcps TDD | Qualcomm Incorporated. CATT, TD Tech, ZTE, Ericsson, ST-Ericsson | CR |
R2‑121882 | Summary of offline discussion on FE FACH | Qualcomm | Disc |
R2‑121883 | Correction of SRB1 mapping info for FACH | Alcatel-Lucent, Broadcom Corporation | CR |
R2‑121884 | Clarification on default radio configuration in CELL_FACH | Panasonic | CR |
R2‑121885 | Correction of 8C-HSDPA fallback to 4C-HSDPA | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd. | CR |
R2‑121886 | Summary of offline discussion on FE FACH | Qualcomm | Disc |
R2‑121887 | Draft Reply LS on Extended S-RNTI | Ericsson | LSout |
R2‑121888 | Clarifications on the event measurement report for DC-HSUPA(R9) | Huawei, HiSilicon | CR |
R2‑121889 | Correction to the secondary uplink frequency activation state after reconfiguration procedure (Rel-9) | Huawei, HiSilicon | CR |
R2‑121890 | Corrections on DSAC and PPAC(R8) | Huawei, HiSilicon | CR |
R2‑121891 | Clarification of capability signaling for UE supporting DB-DC-HSDPA with MIMO | Ericsson, ST-Ericsson | CR |
R2‑121892 | Draft Reply LS on Clarifications on solutions for 3G Macro to Femto hand-in for non-CSG UEs (to: RAN3; cc: RAN4; contact: NSN) | Nokia Siemens Networks | LSout |
R2‑121893 | Corrections on DSAC and PPAC(R8) | Huawei, HiSilicon | CR |
R2‑121894 | Way forward for Fallback to PRACH R99 | Ericsson, ST-Ericsson, Huawei, Hi-Silicon, Nokia Siemens Networks, Alcatel-Lucent, Renesas Mobile Europe Ltd, InterDigital, ZTE, Qualcomm Incorporated, Broadcom Corporation | Disc |
R2‑121895 | Corrections on DSAC and PPAC(R8) | Huawei, HiSilicon | CR |
R2‑121896 | Reply LS to R3-120348 = R2-120849 on Extended S-RNTI (to: RAN3; cc: -; contact: Ericsson) | RAN2 | LSout |
R2‑121897 | Reply LS to R3-120452 = R2-121080 on Clarifications on solutions for 3G Macro to Femto hand-in for non-CSG UEs (to: RAN3; cc: RAN4; contact: NSN) | RAN2 | LSout |
R2‑121898 | Introduction of MDT enhancements | MediaTek | CR |
R2‑121899 | Introduction of Carrier aggregation enhancements | Nokia | CR |
R2‑121900 | Introduction of service contimuity improvements for MBMS on LTE | Huawei | CR |
R2‑121901 | Void | - | - |
R2‑121902 | Void | - | - |
R2‑121903 | Void | - | - |
R2‑121904 | Void | - | - |
R2‑121905 | Void | - | - |
R2‑121906 | Void | - | - |
R2‑121907 | Void | - | - |
R2‑121908 | Void | - | - |
R2‑121909 | Void | - | - |
R2‑121910 | Void | - | - |
R2‑121911 | Void | - | - |
R2‑121912 | Void | - | - |
R2‑121913 | Void | - | - |
R2‑121914 | Void | - | - |
R2‑121915 | Void | - | - |
R2‑121916 | Void | - | - |
R2‑121917 | Void | - | - |
R2‑121918 | Void | - | - |
R2‑121919 | Void | - | - |
R2‑121920 | Void | - | - |
R2‑121921 | Void | - | - |
R2‑121922 | Void | - | - |
R2‑121923 | Void | - | - |
R2‑121924 | Void | - | - |
R2‑121925 | Void | - | - |
R2‑121926 | Void | - | - |
R2‑121927 | Void | - | - |
R2‑121928 | Void | - | - |
R2‑121929 | Void | - | - |
R2‑121930 | Void | - | - |
R2‑121931 | Void | - | - |
R2‑121932 | Void | - | - |
R2‑121933 | Void | - | - |
R2‑121934 | Void | - | - |
R2‑121935 | Void | - | - |
R2‑121936 | Void | - | - |
R2‑121937 | Void | - | - |
R2‑121938 | Void | - | - |
R2‑121939 | Void | - | - |
R2‑121940 | Void | - | - |
R2‑121941 | Void | - | - |
R2‑121942 | Void | - | - |
R2‑121943 | Void | - | - |
R2‑121944 | Void | - | - |
R2‑121945 | Void | - | - |
R2‑121946 | Void | - | - |
R2‑121947 | Void | - | - |
R2‑121948 | Void | - | - |
R2‑121949 | Void | - | - |
R2‑121950 | Draft LS on RAN2 status about CA enhancements (to: RAN1, RAN4; cc: -; contact: Samsung) | Samsung | LSout |
R2‑121951 | Assistance Information for MBMS UEs | Qualcomm Incorporated | Disc |
R2‑121952 | TR 36.822 v0.3.1 covering agreements of RAN2 #77bis | RIM | TR |
R2‑121953 | Differentiating UTRAN modes in FGIs | Qualcomm Incorporated | CR |
R2‑121954 | LS on Uplink Positioning Reset Procedure (to: RAN3; cc: -; contact: TruePosition) | RAN2 | LSout |
R2‑121955 | TR 36.839 v0.5.1 with agreements of RAN2 #77bis | Alcatel-Lucent | TR |
R2‑121956 | Change in Scheduling Information for ETWS | ST-Ericsson, Ericsson | CR |
R2‑121957 | Change in Scheduling Information for CMAS | ST-Ericsson, Ericsson | CR |
R2‑121958 | DRAFT Reply LS to C1-120900 = R2-121066 on re-documentation and alignment of PWS (to: CT1; cc: GERAN, RAN3; contact: ST-Ericsson) | ST-Ericsson | LSout |
R2‑121959 | Clarification on the impacts of measurement gap | CATT | CR |
R2‑121960 | Report from LTE UP session for CA enhancements | LG Electronics Inc. (RAN2 vice-chairman) | Report |
R2‑121961 | Introduction of CA Enhancements in MAC | Ericsson (rapporteur) | CR |
R2‑121962 | DRAFT LS Reply to S2-121016 = R2-121026 on VoHSPA capability indication (to: SA2; cc: -; contact: Qualcomm) | Qualcomm Incorporated | LSout |
R2‑121963 | VoIP continuity between LTE and UMTS | Qualcomm Incorporated | CR |
R2‑121964 | VoIP continuity between LTE and UMTS | Qualcomm Incorporated | CR |
R2‑121965 | Voice over PS continuity | Qualcomm Incorporated | CR |
R2‑121966 | Voice over PS continuity | Qualcomm Incorporated | CR |
R2‑121967 | Way forward for MBMS open issues | Qualcomm Incorporated, Huawei | Disc |
R2‑121968 | Stage-2 agreements on signalling and procedure for interference avoidance for IDC | CMCC | CR |
R2‑121969 | Avoiding unexpected UE prioritization for MBMS where MBMS is not deployed | Huawei | CR |
R2‑121970 | Clarification on networking sharing for MBMS | HTC | CR |
R2‑121971 | Clarification on CMAS usage | Samsung | CR |
R2‑121972 | eDDA – email discussion framework | RIM | Disc |
R2‑121973 | Report of RAN2 #77, Dresden, Germany, 06.02.-10.02.2012 | ETSI MCC | Report |
R2‑121974 | Reply LS to R1-114459 = R2-120010 on RAN2 status on CA enhancements (to: RAN1, RAN4; cc: -; contact: Samsung) | RAN2 | LSout |
R2‑121975 | Draft LS reply to S5-113283 = R2-115676 on MDT Location (to: SA5; cc: SA2; contact: MediaTek) | MediaTek | LSout |
R2‑121976 | TR 36.822 v0.4.0 covering agreements of RAN2 #77bis | RIM | TR |
R2‑121977 | LS on EUTRA message in PS HANDOVER COMMAND (to: GERAN2; cc: RAN5; contact: Ericsson) | RAN2 | LSout |
R2‑121978 | Voice support Capabilities | Nokia Siemens Networks, Deutsche Telekom | CR |
R2‑121979 | Voice support Capabilities | Nokia Siemens Networks, Deutsche Telekom | CR |
R2‑121980 | Voice support Capabilities | Nokia Siemens Networks, Deutsche Telekom | CR |
R2‑121981 | Voice support Capabilities | Nokia Siemens Networks, Deutsche Telekom | CR |
R2‑121982 | LS on UL power headroom for MDT (to: RAN3; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑121983 | LS on multi-PLMN Logged MDT and RLF reporting (to: RAN3; cc: SA5; contact: NSN) | RAN2 | LSout |
R2‑121984 | Reply LS to S5-113283 = R2-115676 on MDT Positioning (to: SA5, SA2; cc: -; contact: MediaTek) | RAN2 | LSout |
R2‑121985 | Reply LS to R1-120946 = R2-121078 on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA (R4-122226; contact: Nokia) | RAN4 | LSin |
R2‑121986 | Reply LS to C1-120907 = R2-121067 on NAS/AS interaction for EAB (to: CT1; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑121987 | Reply LS to S2-121016 = R2-121026 on VoHSPA capability indication (to: SA2, CT1; cc: RAN3; contact: Qualcomm) | RAN2 | LSout |
R2‑121988 | Introduction of CA Enhancements in MAC | Ericsson | CR |
R2‑121989 | Avoiding unexpected UE prioritization for MBMS where MBMS is not deployed | Huawei, Nokia Siemens Networks, Nokia Corporation | CR |
page generated from database: 2024-04-22 07:58:53