The 5G Standard

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 48.058

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - B Rel-5 5.0.0 - Introduction of AMR-WB GP-05 GP-011276 revised WG2 G2-05 - 2001‑06‑06 AMRWB -
0001 1 B Rel-5 5.0.0 5.1.0 Introduction of AMR-WB GP-05 GP-011449 approved WG2 G2-05 - 2001‑06‑06 Wideband_Telephony_Service -
0002 - D Rel-5 5.0.0 - Introduction of Enhanced Power Control GP-06 GP-011677 - G2 G2-06 revised 2001‑08‑29 2G3Ginterworking -
0002 1 D Rel-5 5.0.0 - Introduction of Enhanced Power Control GP-06 GP-011894 - G2 G2-06 revised 2001‑08‑29 2G3Ginterworking -
0002 2 B Rel-5 5.1.0 5.2.0 Introduction of Enhanced Power Control GP-06 GP-011949 approved G2 G2-06 - 2001‑08‑30 2G3Ginterworking No decision at G2 level. Left for the GP to decide.
0003 - B Rel-5 5.2.0 5.3.0 Introduction of Signalling for Adaptive multi rate speech channel at 8-PSK half rate (O-TCH/AHS) GP-07 GP-012050 approved G2 G2-06b G2‑010372 agreed 2001‑10‑17 GERAN_support_for_audio_and_video_codec -
0004 - F Rel-5 5.2.0 5.3.0 Editorial Corrections GP-07 GP-012173 approved G2 G2-07 GP‑012173 agreed 2001‑11‑13 TEI -
0005 - F Rel-4 - - Alignment of speech codecs references in GERAN specifications - - - - G2-07b G2‑020088 revised 2002‑01‑09 GEIMP2 -
0005 1 F Rel-4 4.0.0 4.1.0 Alignment of speech codecs references in GERAN specifications GP-08 GP-020073 approved G2 G2-08 GP‑020073 agreed 2002‑01‑17 TEI4 -
0006 - A Rel-5 5.3.0 5.4.0 Alignment of speech codecs references in GERAN specifications GP-08 GP-020070 approved G2 G2-08 GP‑020070 agreed 2002‑01‑17 TEI4 -
0007 - F Rel-5 5.4.0 5.5.0 Alignment of 8PSK speech codecs references in GERAN specifications GP-09 GP-020682 approved G2 G2-09 GP‑020682 agreed 2002‑03‑06 8PSKAH, GAMRWB -
0008 - C Rel-5 - - Introduction of TFO transparent container I.E. GP-09 - rejected G2 G2-09 GP‑020699 agreed 2002‑03‑06 TFO+AMRNB_/_TFO_+_AMRWB -
0009 - F Rel-5 - - Alignment of number of codecs for WB-AMR to proposed set - - - - G2-09 GP‑020817 revised 2002‑04‑11 TFO+AMRNB_/_TFO_+_AMRWB -
0009 1 F Rel-5 - - Alignment of number of codecs for WB-AMR to proposed set - - - - G2-09 GP‑021042 revised 2002‑04‑18 TFO+AMRNB_/_TFO_+_AMRWB -
0009 2 F Rel-5 5.4.0 5.5.0 Alignment of number of codecs for WB-AMR to proposed set GP-09 GP-021172 approved G2 G2-09 GP‑021172 - 2002‑04‑18 TFO+AMRNB_/_TFO_+_AMRWB -
0010 - C Rel-5 5.5.0 5.6.0 Alignment of number of codecs for WB-AMR to proposed set GP-10 GP‑021724 approved G2 G2-10 G2‑020606 agreed 2002‑05‑24 AMRWB 0
0011 - F Rel-6 5.6.0 6.0.0 Editorial correction of references GP-16 GP‑031997 approved G2 G2-16 GP‑031997 agreed 2003‑08‑20 TEI6 0

page generated from database: 2024-04-22 07:58:53