GERAN WG1 was responsible for the following areas of work of TSG GERAN:
- GERAN radio performance and RF system aspects,
- Internal GERAN interface specifications such Ater (CCU-TRAU),
- Conformance test specifications for testing of all aspects of GERAN Base Stations,
- GERAN specific O&M specifications for the nodes in the GERAN.
Terms of reference
The latest terms of reference were approved at GERAN#15 in document GP-031074.
History
GERAN1 was closed in May 2016 and its work transferred to RAN6.