Generations of Mobile Standards

3GPP Work Items per TSG/WG


Active 3GPP Work Items for group: C6

Note that this page shows only those active (i.e. not yet completed) WIs where C6 is the sole responsible group.
There may be other active WIs for which this group holds joint responsibility, particularly hierachically higher WIs which comprise WIs from several groups: such WIs are not shown on this page.

Click on WI title for details

Building Block: Alignment with requirements regarding USSD usage USSD-USIM Rel-7
Feature or Study Item: ISIM API for Java Card APIJAVA Rel-7
Work task: Test interworking of IP Multimedia Services Identity Module (ISIM) terminals with IP Multimedia Subsystem (IMS) SAES-ISIM_IMS_Test Rel-8
Feature or Study Item: In Case of Emergency numbers storage and easy access on UICC ICE Rel-8
Feature or Study Item: Deleted - Contact Manager Conformance Test specifications eUPHBOOK-Test Rel-8
Building Block: CT6 aspects of ICE ICE Rel-8
Building Block: Internal interface for eUPHBOOK eUPHBOOK-Int_Spec Rel-8
Feature or Study Item: Contact Manager for 3GPP UICC applications eUPHBOOK Rel-8
Building Block: Requirements for Contact Manager eUPHBOOK-St1 Rel-8
Building Block: Deleted - Implementation of eUPHBOOK eUPHBOOK-St23 Rel-8
Feature or Study Item: Enhanced Home NodeB / eNodeB EHNB Rel-9
Feature or Study Item: Deleted - Testing for Terminal support of Rel-10 USIM, ISIM and USAT features USIM_R10_Test Rel-10
Feature or Study Item: Communication Control for IMS by USIM (Stage 3) CC_IMS_USIM Rel-10
Feature or Study Item: Network Improvements for Machine-Type Communications NIMTC Rel-10
Building Block: CN part of Stage 3 for Network Improvements for Machine-Type Communications NIMTC-CN Rel-10
Feature or Study Item: Relays for LTE LTE_Relay Rel-10
Feature or Study Item: Deleted - Network Selection for non-3GPP Access N3GtoNSP Rel-10
Building Block: Deleted - CT6 issues for N3GtoNSP N3GtoNSP Rel-10
Feature or Study Item: System Improvements to Machine-Type Communications SIMTC Rel-11
Building Block: Stage 2/3 for CS aspects for SIMTC SIMTC-CS Rel-11
Work task: Deleted - CT6 part of Stage 3 Signalling Optimizations of SIMTC SIMTC-Sig Rel-11
Work task: Deleted - CT6 part of Stage 3 CS aspects for SIMTC SIMTC-CS Rel-11
Work task: CT6 part of Stage 3 BB1: Reachability Aspects of SIMTC SIMTC-ReachCSPS Rel-11
Work task: CT6 part of Stage 3 Extended Access Barring for UTRAN and E-UTRAN SIMTC-RAN_OC Rel-11
Feature or Study Item: Study on Development of conformance requirements for the IP Multimedia Services Identity Module (ISIM) application support in ME FS_ISIM_CR Rel-12
Work task: CT6 part of Stage 3 for BB3: UE Power Consumptions Optimizations (UEPCOP) MTCe-UEPCOP-CT6 Rel-12
Feature or Study Item: Study on Review of dedicated 3GPP UICC features FS_Red_UCe Rel-13
Work task: CT6 aspects of evolution to and interworking with eCall in IMS EIEI-CT Rel-14
Building Block: CT6 aspects of IOC_UE_conf IOC_UE_conf Rel-14
Feature or Study Item: Study on UICC power optimization for MTC FS_UICC_MTC_OPT Rel-14
Work task: CT6 aspects of Enhancements for Mission Critical Push To Talk MCImp-eMCPTT-CT Rel-14
Work task: CT6 aspects of MCData MCImp-MCDATA-CT Rel-14
Work task: CT6 aspects 3 of MCVideo MCImp-MCVIDEO-CT Rel-14
Work task: CT6 aspects of PS Data Off PS_DATA_OFF-CT Rel-14
Work task: CT6 aspects of Support of Emergency services over WLAN – phase 1 SEW1-CT Rel-13
Work task: CT6 aspects of extended DRX cycle eDRX-CT Rel-13
Work task: CT6 aspects for MCPTT protocol aspects MCPTT-CT Rel-13
Building Block: CT aspects for IOPS IOPS-CT Rel-13
Work task: CT6 aspects for IOPS IOPS-CT Rel-13
Work task: CT6 aspects of CIoT CIoT-CT Rel-13
Work task: CT6 aspects of system architecture enhancements for TV service AE_enTV-CT Rel-14
Feature or Study Item: IMS impacts on UICC Application Aspects (Stage 3) IMS_UApAs Rel-12
Work task: CT6 aspects of enhancements to Proximity-based eProSe-Ext-CT Rel-13
Feature or Study Item: Review of dedicated 3GPP UICC features Red_UCe Rel-13
Building Block: CT6 aspects of MCPTTProtoc1 MCPTTProtoc1 Rel-14
Work task: CT6 aspects of eDecor eDecor-CT Rel-14
Work task: Stopped - CT6 aspects of SEW2 SEW2-CT Rel-14
Work task: CT6 aspects of V2X Services V2X-CT Rel-14
Work task: CT6 part of Stage 3 for Application specific Congestion control for Data Communication ACDC-CT Rel-13
Building Block: BB1: Stage 3 (CS+PS) Reachability Aspects of SIMTC SIMTC-ReachCSPS Rel-11
Work task: Deleted - Stage 3 (CS+PS) CN-based requirements and Power Considerations of SIMTC SIMTC-CN_Pow Rel-11
Building Block: RAN overload control for Machine-Type Communications SIMTC-RAN_OC Rel-11
Work task: Deleted - Stage 3 (CS+PS) Signalling Optimizations of SIMTC SIMTC-Sig Rel-11
Work task: Stage 3 CS aspects for SIMTC SIMTC-CS Rel-11
Work task: Deleted - CT6 part of Stage 3 CN-based requirements and Power Considerations of SIMTC SIMTC-CN_Pow Rel-11
Work task: Stage 3 (CS+PS) Extended Access Barring for UTRAN and E-UTRAN SIMTC-RAN_OC Rel-11
Feature or Study Item: In Case of Emergency (ICE) Graphics ICE_Graphics Rel-9
Feature or Study Item: Definition of the UICC Application for Hosting Party Module HPM_UICC Rel-11
Work task: CT6 part of Stage 3 for Network Improvements for Machine-Type Communications NIMTC-CN Rel-10
Feature or Study Item: UICC access to IMS Specification IMS-UICC-S Rel-10
Work task: CT6 aspects of LTE Relay Node Security LTE_Relay-Sec Rel-10
Building Block: CT6 part of UICC access to IMS Specification IMS-UICC-S Rel-10
Feature or Study Item: Study on UICC access to IMS FS_IMS-UICC Rel-10
Building Block: Deleted - Contact Manager for 3GPP UICC applications test specifications eUPHBOOK-Test Rel-8
Building Block: Deleted - Contact Manager API for Java™ Card test specification eUPHBOOK-Test Rel-8
Work task: Core specification for CT6 aspects of SAE SAES Rel-8
Building Block: CT6 part of Stage 3 for I-WLAN NSP IWLANNSP Rel-8
Feature or Study Item: Introduction of Smart Card Web Server launch functionality SCWS_L Rel-10
Feature or Study Item: USAT using AT Commands USAT_AT Rel-10
Building Block: LTE Relay Nodes Security LTE_Relay-Sec Rel-10
Building Block: External interface for eUPHBOOK eUPHBOOK-Ext_Spec Rel-8
Work task: CT6 part of CT aspects of Proximity-based Services ProSe-CT Rel-12
Feature or Study Item: I-WLAN Network Selection Principle (NSP) IWLANNSP Rel-8
Feature or Study Item: 3GPP System Architecture Evolution Specification - Evolved Packet System (non RAN aspects) SAES Rel-8
Feature or Study Item: Unstructured Supplementary Service Data (USSD) message delivery and transfer to USIM USSD-USIM Rel-7
Feature or Study Item: Study on Security Aspects of Remote Provisioning and Change of Subscription for M2M Equipment FS_UM2M Rel-9
Feature or Study Item: Deleted - Definition of 3GPP UICC services over the new high-speed interface UICCHS Rel-9
Feature or Study Item: High speed interface between the UICC and the ME HSI Rel-7
Feature or Study Item: Rel-7 (U)SIM API Testing (TS 31.213) USIM_API_Test Rel-7
Work task: Test interworking of LTE Terminals with the USIM SAES-USIM_LTE-Test Rel-8
Building Block: CT6 aspects of SAE SAES Rel-8
Building Block: CT6 aspects - Support of Home NB and Home eNB enhancements EHNB-CT6 Rel-9
Building Block: UE Conformance Test Aspects - CT6 aspects of 5G System 5GS_Ph1_UEConTest Rel-15
Feature or Study Item: Study on Technical Requirements for a new secure platform for 3GPP applications FS_NG_SP Rel-15
Work task: Stopped - CT6 aspects of MONASTERY MONASTERY Rel-15
Work task: CT6 aspects of 5G System - Phase 1 5GS_Ph1-CT Rel-15
Work task: CT6 aspects of eMCVideo eMCVideo-CT Rel-15
Work task: Stopped - CT6 aspects of LTE_LIGHT_CON LTE_LIGHT_CON-CT Rel-15
Work task: Study on CT6 aspects of 5G System - Phase 1 5GS_Ph1-CT Rel-15
Feature or Study Item: Study on technical requirements for a new secure platform for 3GPP applications FS_NG_SP2 Rel-15
Work task: CT6 aspects of VoWLAN VoWLAN-CT Rel-15
Work task: CT6 aspects of PS Data Off Phase 2 PS_DATA_OFF2-CT Rel-15
Feature or Study Item: UICC-terminal interface testing for UEs with non-removable UICCs nrUICC_UEConTest Rel-16
Feature or Study Item: UE Conformance Test Aspects Release 16 UEConTest_R16 Rel-16
Work task: CT6 aspects of 5G_CIoT 5G_CIoT Rel-16
Work task: CT6 aspects of PARLOS PARLOS Rel-16
Work task: CT6 aspects of eV2XARC eV2XARC Rel-16
Feature or Study Item: Update of conformance test specifications to Rel-17 UEConTest_R17 Rel-17
Building Block: CT6 aspects of 5MBS 5MBS Rel-17
Building Block: CT6 aspects of NSWO NSWO_5G Rel-17
Building Block: CT6 aspects of NR_redcap ARCH_NR_REDCAP Rel-17
Building Block: CT6 aspects of NB-IoT/eMTC Non-Terrestrial Networks in EPS IoT_SAT_ARCH_EPS Rel-17
Work task: CT6 aspects of 5G_ProSe 5G_ProSe Rel-17
Building Block: CT6 aspects of eV2XARC_Ph2 eV2XARC_Ph2 Rel-17
Building Block: Stage 3 (CT6) of eCPSOR_CON eCPSOR_CON Rel-17
Work task: CT6 aspects of 5GC architecture for satellite networks 5GSAT_ARCH-CT Rel-17
Building Block: CT6 aspects of ING_5GS ING_5GS Rel-17
Work task: CT6 aspects of MINT MINT Rel-17
Feature or Study Item: Study on GBA_U Based APIs FS_GBA_U_API Rel-18
Feature or Study Item: Study on new UICC application for network slice-specific authentication and authorization (NSSAA) FS_NS_Slice-USIM Rel-18
Feature or Study Item: Test method of GBA_U Based APIs TEST_GBA_U_APIs Rel-18
Feature or Study Item: UE conformance test for NB-IoT/eMTC Non-Terrestrial Networks in EPS IoT_SAT_UEConTest Rel-18
Building Block: CT6 aspects of NG_RTC NG_RTC Rel-18
Building Block: CT6 aspects of MPS_WLAN MPS_WLAN Rel-18
Feature or Study Item: Update of conformance test specifications to Rel-18 UEConTest_R18 Rel-18
Building Block: CT6 aspects of MBS support for V2X services TEI18_MBS4V2X Rel-18
Building Block: Stopped – CT6 aspects of Slice-based PLMN Selection PLMNsel_NS Rel-18
Feature or Study Item: Enhancement of Network Slicing UICC application for network slice-specific authentication and authorization eNS_UICC Rel-18
Feature or Study Item: GBA_U Based APIs GBA_U_APIs Rel-18
Building Block: deleted - CT6 aspects of 5GSAT_Ph2 5GSAT_Ph2 Rel-18
Building Block: CT6 aspects of UEConfig5MBS UEConfig5MBS Rel-18
Building Block: CT6 aspects of UAS Ph2 UAS_Ph2 Rel-18
Building Block: CT6 aspects of SENSE SENSE Rel-18
Building Block: CT6 aspects of 5G_ProSe_Ph2 5G_ProSe_Ph2 Rel-18
Work task: CT6 aspects of Proximity-based Services in 5GS Phase 3 5G_ProSe_Ph3 Rel-19
Work task: CT6 aspects of System architecture for Next Generation Real time Communication services Phase 2 NG_RTC_Ph2 Rel-19
Work task: CT6 aspects of ProSe support in NPN TEI19_ProSe_NPN Rel-19

page generated from database: 2024-12-11 16:42:19