Tdoc List

2011-10-18 14:56

Tdoc Title Source Doc-type Doc-for Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S5-112800 Agenda WG Chairman agenda approval 2 Yes Yes approved No
S5-112801 Report from last SA5 meeting MCC meeting report approval 4.1 Yes Yes approved No
S5-112802 Report from last SA meeting WG Chairman meeting report approval 4.2 Yes Yes noted No
S5-112803 OAM Time Plan WG Chairman other discussion 6.1 Yes Yes approved No
S5-112804 OAM Detailed Report from LAST Meeting OAM SWG Chair meeting report approval 6.1 No No withdrawn Yes
S5-112805 OAM Executive Report from THIS Meeting OAM SWG Chair meeting report approval 6.1 Yes Yes approved No
S5-112806 OAM Detailed Report from THIS Meeting OAM SWG Chair meeting report approval 6.1 Yes Yes not addressed No
S5-112807 CH Agenda and Time Plan CH SWG Chair agenda approval 7.1 Yes Yes approved No
S5-112808 CH List of Documents CH SWG Chair other discussion 7.1 No No withdrawn Yes
S5-112809 CH Detailed Report from LAST Meeting CH SWG Chair meeting report approval 7.1 Yes Yes agreed No
S5-112810 CH Executive Report from THIS Meeting CH SWG Chair meeting report approval 7.1 Yes Yes approved No
S5-112811 CH Detailed Report from THIS Meeting CH SWG Chair meeting report approval 7.1 No Yes not addressed No
S5-112812 SA5 Meeting Calendar WG Chairman other discussion 5.2 Yes Yes noted No
S5-112813 SA5 Working Procedures WG Chairman other discussion 5.1 Yes Yes noted No
S5-112814 SA5 Meeting Facility Requirements WG Chairman other discussion 5.1 Yes Yes noted No
S5-112815 Draft TS/TR Management Process WG Vice Chair other discussion 5.1 Yes Yes noted No
S5-112816 CR Quality Check MCC other discussion 5.1 Yes Yes noted No
S5-112817 Agenda Leaders Meeting WG Chairman agenda approval 5.1 Yes Yes noted No
S5-112818 TR 30.821 Project scheduling for SA5 Release 11 MCC other discussion 5.4 Yes Yes noted No
S5-112819 SA5 3GPP Work Plan MCC other discussion 5.4 Yes Yes noted No
S5-112820 Deliverables due for the NEXT SA Plenary MCC other discussion 5.4 Yes Yes noted No
S5-112821 IPR declaration WG Chairman other discussion 3 Yes Yes noted No
S5-112822 Agenda OAM&P Maintenance and Rel-11 small Enhancements Rapporteur agenda approval 6.3 No No withdrawn Yes
S5-112823 Agenda IRP framework enhancements to support Management of Converged Networks (510056) Rapporteur agenda approval 6.4.1 No No withdrawn Yes
S5-112824 Agenda IMS performance management enhancement (510057) Rapporteur agenda approval 6.5.1 Yes Yes approved No
S5-112825 Agenda Enhanced Management of UE based network performance measurements (510058) Rapporteur agenda approval 6.5.2 Yes Yes approved No
S5-112826 Agenda CN performance measurements enhancement (520034) Rapporteur agenda approval 6.5.3 Yes Yes approved No
S5-112827 Agenda UTRAN Self-Organizing Networks (SON) management (510059) Rapporteur agenda approval 6.6.1 No No withdrawn Yes
S5-112828 Agenda Study on version handling (470050) Rapporteur agenda approval 6.7.1 No Yes approved No
S5-112829 Agenda Study on Management of Converged Networks (480047) Rapporteur agenda approval 6.7.2 No No withdrawn Yes
S5-112830 Agenda Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) Rapporteur agenda approval 6.7.3 No Yes agreed No
S5-112831 Agenda Study on OAM aspects of inter-RAT Energy Saving (510045) Rapporteur agenda approval 6.7.4 Yes Yes approved No
S5-112832 Agenda Study on management of Heterogeneous Networks (510046) Rapporteur agenda approval 6.7.5 No Yes approved No
S5-112833 Agenda Management for Carrier Aggregation for LTE (530049) Rapporteur agenda approval 6.4.2 Yes Yes approved No
S5-112834 Agenda Network Management for 3GPP Interworking WLAN (530050) Rapporteur agenda approval 6.4.3 No Yes approved No
S5-112835 Agenda LTE Self-Organizing Networks (SON) coordination management (530051) Rapporteur agenda approval 6.6.2 No No withdrawn Yes
S5-112836 Minutes IRP framework enhancements to support Management of Converged Networks (510056) Rapporteur meeting report approval 6.4.1 No No withdrawn Yes
S5-112837 Minutes IMS performance management enhancement (510057) Rapporteur meeting report approval 6.5.1 No Yes noted No
S5-112838 Minutes Enhanced Management of UE based network performance measurements (510058) Rapporteur meeting report approval 6.5.2 Yes Yes noted No
S5-112839 Minutes CN performance measurements enhancement (520034) Rapporteur meeting report approval 6.5.3 Yes Yes noted No
S5-112840 Minutes UTRAN Self-Organizing Networks (SON) management (510059) Rapporteur meeting report approval 6.6.1 No Yes noted No
S5-112841 Minutes Study on version handling (470050) Rapporteur meeting report approval 6.7.1 Yes Yes noted No
S5-112842 Minutes Study on Management of Converged Networks (480047) Rapporteur meeting report approval 6.7.2 Yes Yes noted No
S5-112843 Minutes Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) Rapporteur meeting report approval 6.7.3 Yes Yes noted No
S5-112844 Minutes Study on OAM aspects of inter-RAT Energy Saving (510045) Rapporteur meeting report approval 6.7.4 No Yes noted No
S5-112845 Minutes Study on management of Heterogeneous Networks (510046) Rapporteur meeting report approval 6.7.5 Yes Yes noted No
S5-112846 Minutes Leaders Meeting WG Chairman meeting report approval 5.1 Yes Yes noted No
S5-112847 Minutes Management for Carrier Aggregation for LTE (530049) Rapporteur meeting report approval 6.4.2 Yes Yes noted No
S5-112848 Minutes Network Management for 3GPP Interworking WLAN (530050) Rapporteur meeting report approval 6.4.3 Yes Yes noted No
S5-112849 Minutes LTE Self-Organizing Networks (SON) coordination management (530051) Rapporteur meeting report approval 6.6.2 Yes Yes noted No
S5-112850 Minutes OAM&P Maintenance and Rel-11 small Enhancements Rapporteur meeting report approval 6.3 Yes Yes noted No
S5-112851 Draft Terms of Reference Joint Working Group Multi SDOs WG Chairman other information 4.4 Yes Yes noted No
S5-112852 CR approved at last SA meeting with an action to SA5 to remove hanging paragraphs WG Chairman other information 6.3 Yes Yes noted No
S5-112853 Minutes of OAM SWG opening and closing sessions OAM SWG Chair meeting report approval 6.1 Yes Yes noted No
S5-112854 Minutes of OAM SWG Work Item session OAM SWG Chair meeting report approval 6.2 No No withdrawn Yes
S5-112855 R11 CR 32 260 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 Yes Yes revised No S5-113147
S5-112856 R11 CR 32 298 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 Yes Yes revised No S5-113148
S5-112857 R11 CR 32.299 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 Yes Yes revised No S5-113149
S5-112858 R10 CR 32298 Correction on ASN.1 syntax - alignment with TS 29.002 Nokia Siemens Networks CR agreement 7.3 Yes Yes revised No S5-113164
S5-112859 Reply LS to S5-111696/S3-100575 on Minimization of Drive Tests (MDT) privacy S3-110844/postponed S5-112272 i/c LS discussion 6.5.2 Yes Yes noted No
S5-112860 LS on Radio metrics with respect to QoE S4-110800 / postponed S5-112588 i/c LS discussion 6.1 Yes Yes replied to No
S5-112861 Response LS on Equivalent PLMN identities and MDT R3-112291 i/c LS discussion 6.5.2 Yes Yes noted No
S5-112862 Reply LS to S5-112591 on the work split between SA5 and CT3 for QoS Control based on Subscriber Spending Limits C3-111634 i/c LS discussion 7.4.2 Yes Yes noted No
S5-112863 Reply LS on error scenarios and signalling impacts R3-112292 i/c LS discussion 6.5.2 Yes Yes postponed to the next meeting No
S5-112864 Reply LS on Minimization of Drive Tests (MDT) privacy R3-112314 i/c LS discussion 6.5.2 Yes Yes replied to No
S5-112865 Liaison statement from ETSI ISG AFI to 3GPP SP-110446 (ETSI ISG AFI) i/c LS discussion 4.3 Yes Yes noted No
S5-112866 SA5 presentation at SA#53 WG Chairman meeting report approval 4.2 Yes Yes noted No
S5-112867 LS on Applicability of ePLMN to MDT R2-114802 i/c LS discussion 6.5.2 Yes Yes noted No
S5-112868 LS on MDT and RAN Sharing R2-114807 i/c LS discussion 6.5.2 Yes Yes replied to No
S5-112869 LS on MDT inconsistency R2-114810 i/c LS discussion 6.5.2 Yes Yes noted No
S5-112870 LS on Parallel counting issue R2-114811 i/c LS discussion 6.1 Yes Yes postponed to the next meeting No
S5-112871 R11 CR 32298 Correction on ASN.1 syntax - alignment with TS 29.002 Nokia Siemens Networks CR agreement 7.3 Yes Yes revised No S5-113165
S5-112872 CR R10 IRPVersion Ericsson CR agreement 6.3 Yes Yes agreed No
S5-112873 TD Use of TP for Converged Management Ericsson other discussion 6.7.2 Yes Yes noted No
S5-112874 CR R10 32.432 Add missing references Ericsson CR agreement 6.3 Yes Yes agreed No
S5-112875 CR R10 32.435 Correction of stage-2 TS reference Ericsson CR agreement 6.3 Yes Yes agreed No
S5-112877 CR R7 32.395 Correct syntax errors in xml schema ETRI CR agreement 6.3 Yes Yes agreed No
S5-112878 CR R8 32.395 Correct syntax errors in xml schema ETRI CR agreement 6.3 Yes Yes agreed No
S5-112879 CR R9 32.395 Correct syntax errors in xml schema ETRI CR agreement 6.3 Yes Yes agreed No
S5-112880 CR R10 32.396 Correct syntax errors in xml schema and wsdl ETRI CR agreement 6.3 Yes Yes agreed No
S5-112881 MDT security issues discussion paper Nokia Siemens Networks other discussion 6.5.2 Yes Yes noted No
S5-112882 32.421 R10 MDT Data Controller requirements Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113175
S5-112883 32.421 R11 MDT Data Controller requirements Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113176
S5-112884 32.422 R10 introduce TCE PLMN Nokia Siemens Networks CR agreement 6.5.2 Yes No withdrawn Yes
S5-112885 32.422 R11 introduce TCE PLMN Nokia Siemens Networks CR agreement 6.5.2 Yes No withdrawn Yes
S5-112886 32.422 R10 restrict UE selection Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113177
S5-112887 32.422 R11 restrict UE selection Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113178
S5-112888 32.422 R10 restrict MDT retrieval Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113179
S5-112889 32.422 R11 restrict MDT retrieval Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113180
S5-112890 32.642 R10 add tcePLMN to tce mapping in RNCFunction Nokia Siemens Networks CR agreement 6.5.2 Yes No withdrawn Yes
S5-112891 32.646 R10 add tcePLMN to tce mapping in RNCFunction Nokia Siemens Networks CR agreement 6.5.2 Yes No withdrawn Yes
S5-112892 32.762 R10 add tcePLMN to tce mapping in ENBFunction Nokia Siemens Networks CR agreement 6.5.2 Yes No withdrawn Yes
S5-112893 32.766 R10 add tcePLMN to tce mapping in ENBFunction Nokia Siemens Networks CR agreement 6.5.2 Yes No withdrawn Yes
S5-112894 CR R8 32.251 Add Network Initiated PDP in P-GW CDR ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112895 CR R8 32.299 Add AVP Network-Initiated-PDP-Context ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112896 CR R8 32.298 Correct description of Network Initiated PDP ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112897 CR R9 32.251 Add Network Initiated PDP in P-GW CDR ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112898 CR R9 32.299 Add AVP Network-Initiated-PDP-Context ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112899 CR R9 32.298 Correct description of Network Initiated PDP ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112900 CR R10 32.251 Add Network Initiated PDP in P-GW CDR ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112901 CR R10 32.299 Add AVP Network-Initiated-PDP-Context ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112902 CR R10 32.298 Correct description of Network Initiated PDP ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112903 CR R11 32.299 Add AVP Network-Initiated-PDP-Context ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112904 CR R8 32.251 Add charging triggering for PDN type IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112905 CR R8 32.299 Add charging triggering and IPv4 address updating when PDN type is IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112906 CR R8 32.298 Add IPv4 address in list of service data for PDN type IPv4v6 and deferred IPv4 addressingPDP ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112907 CR R9 32.251 Add charging triggering for PDN type IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112908 CR R9 32.299 Add charging triggering and IPv4 address updating when PDN type is IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112909 CR R9 32.298 Add IPv4 address in list of service data for PDN type IPv4v6 and deferred IPv4 addressingPDP ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112910 CR R10 32.251 Add charging triggering for PDN type IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112911 CR R10 32.299 Add charging triggering and IPv4 address updating when PDN type is IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112912 CR R10 32.298 Add IPv4 address in list of service data for PDN type IPv4v6 and deferred IPv4 addressingPDP ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112913 CR R11 32.299 Add charging triggering and IPv4 address updating when PDN type is IPv4v6 and deferred IPv4 addressing ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112914 CR R8 32.251 Add binding of avp on service data reporting distinguished by IPv4 and IPv6 address and fields ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112915 CR R8 32.299 Add service data reporting distinguished by IPv4 address and IPv6 address ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112916 CR R8 32.298 Add packets and octets distinguished by IPv4 address and IPv6 address in ListofServiceData ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112917 CR R9 32.251 Add binding of avp on service data reporting distinguished by IPv4 and IPv6 address and fields ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112918 CR R9 32.299 Add service data reporting distinguished by IPv4 address and IPv6 address ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112919 CR R9 32.298 Add packets and octets distinguished by IPv4 address and IPv6 address in ListofServiceData ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112920 CR R10 32.251 Add binding of avp on service data reporting distinguished by IPv4 and IPv6 address and fields ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112921 CR R10 32.299 Add service data reporting distinguished by IPv4 address and IPv6 address ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112922 CR R10 32.298 Add packets and octets distinguished by IPv4 address and IPv6 address in ListofServiceData ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112923 CR R11 32.299 Add service data reporting distinguished by IPv4 address and IPv6 address ZTE CR agreement 7.3 Yes No withdrawn Yes
S5-112924 CR R11 32.409 Add simultaneous online and answered session related measurements ZTE CR agreement 6.5.1 Yes No withdrawn Yes
S5-112925 CR R11 32409 Add the number of release before ringing and release while ringing on CSCF ZTE CR agreement 6.5.1 Yes Yes revised No S5-113116
S5-112926 CR R11 32454 Add the session establishment network success rate related KPI ZTE CR agreement 6.5.1 Yes Yes revised No S5-113117
S5-112927 CR R11 32.409 Correct OIP and add OIR related measurement ZTE CR agreement 6.5.1 Yes Yes revised No S5-113118
S5-112928 CR R11 32.409 Add TIP and TIR service related measurements ZTE CR agreement 6.5.1 Yes Yes revised No S5-113119
S5-112929 CR R11 32.409 Add MWI service related measurements ZTE CR agreement 6.5.1 Yes Yes revised No S5-113120
S5-112930 CR R11 32.409 Add FA service related measurements ZTE CR agreement 6.5.1 Yes Yes revised No S5-113121
S5-112931 CR R11 32.409 Add CRS service related measurements ZTE CR agreement 6.5.1 Yes Yes revised No S5-113122
S5-112932 CR R11 32.409 Add CAT service related measurements ZTE CR agreement 6.5.1 Yes Yes revised No S5-113123
S5-112933 CR R11 32.409 Add AOC service related measurements ZTE CR agreement 6.5.1 Yes Yes revised No S5-113124
S5-112934 WID System Improvements for Machine Type Communication Ericsson revised WID agreement 7.2 Yes Yes revised No S5-113146
S5-112935 Rel-11 CR 32.260 Addition of Served user Ericsson CR agreement 7.3 Yes Yes revised No S5-113171
S5-112936 Rel-11 CR 32.298 Addition of Served user Ericsson CR agreement 7.3 Yes No withdrawn Yes
S5-112937 Rel-11 CR 32.299 Addition of Served user Ericsson CR agreement 7.3 Yes No withdrawn Yes
S5-112938 Rel-10 CR 32.260 Correction on BGCF charging Ericsson CR agreement 7.3 Yes No withdrawn Yes
S5-112939 Rel-11 CR 32.260 Correction on BGCF charging Ericsson CR agreement 7.3 Yes No withdrawn Yes
S5-112940 pCR TR 32.834 prioritization between Inter-RAT and LTE Energy Saving KPN, Nokia Siemens Networks, NEC pseudo CR approval 6.7.4 Yes Yes revised No S5-113198
S5-112941 Class name space and version Ericsson other discussion 6.7.1 Yes Yes noted No
S5-112942 pCR 32.833 MNO launches a new service Nokia Siemens Networks pseudo CR approval 6.7.2 Yes Yes approved No
S5-112943 pCR 32.833 End user has problems with a streaming service Nokia Siemens Networks pseudo CR approval 6.7.2 Yes Yes approved No
S5-112944 32.901 Remove AS IOC from HLR app data diagram Alcatel-Lucent pseudo CR approval 6.7.3 Yes Yes approved No
S5-112945 32.901-Remove AS IOC in HSS appl data diagram Alcatel-Lucent pseudo CR approval 6.7.3 Yes Yes approved No
S5-112946 32.901-Disclaimer that IOCs do not replace existing 3GPP IOCs Alcatel-Lucent pseudo CR approval 6.7.3 Yes Yes revised No S5-113202
S5-112947 32.901-Clarify that MMTel IOC is transparent to applications Alcatel-Lucent pseudo CR approval 6.7.3 Yes Yes revised No S5-113203
S5-112948 Rel-11 CR 32.251 Rating Group change handling in FBC Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-112949 Rel-11 CR 32.299 Rating Group change handling in FBC Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-112950 Rel-11 CR 32.296 Editorial Change Rc Reference Point Huawei CR agreement 7.3 Yes Yes revised No S5-113174
S5-112951 Rel-11 CR 32.296 Function Definition of OCS for Sy Huawei CR agreement 7.4.2 Yes Yes revised No S5-113197
S5-112952 CR R9 32250 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes revised No S5-113158
S5-112953 CR R10 32250 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes revised No S5-113159
S5-112954 CR R9 32298 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes revised No S5-113160
S5-112955 CR R10 32298 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes revised No S5-113161
S5-112956 CR R11 32298 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes revised No S5-113163
S5-112957 CR R10 32297 Correction of the high/low release identifier in CDR file header format Alcatel-Lucent CR agreement 7.3 No Yes agreed No
S5-112958 CR R10 32.442 Correction areaScope parameter Ericsson CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-112959 CR R10 32.446 Correction IRP reference Ericsson CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-112960 Rel-11 CR 32.240 Introduction of Sy reference point on charging architecture and information flows ZTE CR agreement 7.4.2 Yes Yes revised No S5-113199
S5-112961 CR R11 32.442 Correction areaScope parameter Ericsson CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-112962 CR R11 32.446 Correction IRP reference Ericsson CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-112963 Discussion paper: Correction in use of areaScope attribute Ericsson other discussion 6.5.2 Yes Yes noted No
S5-112964 Discussion paper: RLF reporting in MDT trace Ericsson other discussion 6.5.2 Yes Yes noted No
S5-112965 CR R11 32.422 Adding RLF reporting to MDT Ericsson other discussion 6.5.2 Yes Yes withdrawn Yes
S5-112966 Discussion paper: MDT positioning Ericsson other discussion 6.5.2 Yes Yes noted No
S5-112967 CR R11 32.522 Add Coordination scenario between MLB and MRO ZTE CR agreement 6.6.2 Yes Yes noted No
S5-112968 Discussion paper of RRC related measurements for CA Nokia Siemens Networks other discussion 6.4.2 Yes Yes noted No
S5-112969 CR R11 32.425 Add statement for RRC connection related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112970 Discussion paper of handover related measurements for CA Nokia Siemens Networks other discussion 6.4.2 Yes Yes noted No
S5-112971 CR R11 32.425 Add statement for handover related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112972 CR R11 32.425 Add statement for UE-associated logical S1-connection related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112973 CR R11 32.425 Paging related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112974 CR R11 32.425 Equipment resources related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112975 CR R11 32.425 Common LAs of overlapping RATÔÇÖs coverage related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112976 Discussion paper of CQI and Timing advance related measurements for CA Nokia Siemens Networks other discussion 6.4.2 Yes Yes noted No
S5-112977 CR R11 32.425 Add statement for CQI and Timing advance related measurements in CA Nokia Siemens Networks CR agreement 6.4.2 Yes Yes noted No
S5-112978 CR R11 32.425 subcounters For Too-Late Handover Nokia Siemens Networks CR agreement 6.3 Yes Yes revised No S5-113108
S5-112979 Discussion Paper to Initiate the Preparation of a Presentation on the OCS Architecture and Functionalities Relevant Sy to CT3 Openet other discussion 7.4.2 Yes Yes revised No S5-113200
S5-112980 Discussion paper on ICID handling in case of some MMTel services Ericsson other discussion 7.3 Yes Yes noted No
S5-112981 CR 32.652 Rel-8 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113130
S5-112982 CR 32.652 Rel-9 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113131
S5-112983 CR 32.652 Rel-10 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113132
S5-112984 CR 32.642 Rel-8 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113133
S5-112985 CR 32.642 Rel-9 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113134
S5-112986 CR 32.642 Rel-10 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113135
S5-112987 CR 32.652 Rel-8 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113136
S5-112988 CR R10 32 421 Correction of figure 4.2.1 Architecture for Management Based ActivationDeactivation Huawei, Orange CR agreement 6.3 Yes Yes revised No S5-113210
S5-112989 CR 32.652 Rel-9 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113137
S5-112990 CR R11 32 421 Correction of figure 4.2.1 Architecture for Management Based ActivationDeactivation Huawei, Orange CR agreement 6.3 Yes Yes revised No S5-113211
S5-112991 CR 32.652 Rel-10 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113138
S5-112992 CR 32.642 Rel-8 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113139
S5-112993 CR R8 32.762 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-112994 CR R8 32.763 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-112995 CR R8 32.765 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-112996 CR R9 32.762 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-112997 CR 32.642 Rel-9 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113140
S5-112998 CR R9 32.763 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-112999 CR R9 32.765 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-113000 CR 32.642 Rel-10 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113141
S5-113002 CR R10 32.762 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-113003 CR R10 32.766 Add missing ANR switch management solution Huawei CR agreement 6.3 Yes Yes noted No
S5-113004 CR 32.421 R11 Add MDT UE selection criteria requirements Huawei CR agreement 6.5.2 Yes Yes noted No
S5-113005 Discussion on RLF reporting requirements over Itf-N Huawei other discussion 6.5.2 Yes Yes withdrawn Yes
S5-113006 CR 32.421 R11 Add RLF reporting requirements Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113007 CR 32.441 R11 Add RLF reporting requirements - Align with 32.421 Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113008 Discussion on RLF reporting configuration over Itf-N Huawei other discussion 6.5.2 Yes Yes withdrawn Yes
S5-113009 CR 32.422 R11 Add RLF reporting configuration Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113010 CR 32.442 R11 Add RLF reporting configuration -Align with 32.422 Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113011 Discussion on RLF reporting mechanism in Immediate MDT Huawei other discussion 6.5.2 Yes Yes withdrawn Yes
S5-113012 pCR TR 32.834 introducing restricted Energy Saving Level state KPN, Nokia Siemens Networks pseudo CR approval 6.7.4 Yes Yes noted No
S5-113013 CR 32.422 R11 Add RLF reporting mechanism in Immediate MDT Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113014 Rel-9 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 Yes Yes revised No S5-113111
S5-113015 Rel10 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 Yes Yes revised No S5-113112
S5-113016 Rel11 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 Yes Yes revised No S5-113113
S5-113017 Remove inconsistency to align the MDT parameters with RAN implementation Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113182
S5-113018 RLF reporting Nokia Siemens Networks other discussion 6.5.2 Yes Yes withdrawn Yes
S5-113019 Rel11 CR 32422 RLF reporting Nokia Siemens Networks CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113020 Handling of attribute ranges at domain borders for SON coordination Nokia Siemens Networks pseudo CR approval 6.6.2 Yes Yes noted No
S5-113021 CR 32.652 Rel-11 Add IRAT ANR from UTRAN and from E-UTRAN to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113143
S5-113022 CR 32.642 Rel-11 Add IRAT ANR from E-UTRAN to UTRAN, plus UTRAN Intra-RAT ANR Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113144
S5-113023 CR 32.762 Rel-11 Add IRAT ANR from UTRAN to E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 Yes Yes revised No S5-113145
S5-113024 pCR 32.834 Considerations on delegated ESM NEC pseudo CR approval 6.7.4 Yes Yes noted No
S5-113025 Discussion on coordination in case of missing X2 link information NEC other discussion 6.6.2 Yes Yes noted No
S5-113026 Requirement and Solutions for Statistical Energy Saving Management Nokia Siemens Networks, Deutsche Telekom pseudo CR approval 6.7.4 Yes Yes revised No S5-113201
S5-113027 Modified energy saving modelling for grouping of cells Nokia Siemens Networks pseudo CR approval 6.7.4 Yes Yes approved No
S5-113028 CR R10 32297 Correction on CDR header format Alcatel-Lucent CR agreement 7.3 No Yes agreed No
S5-113029 Discussion paper of MDT handling in EPLMN Scenario Huawei other discussion 6.5.2 Yes Yes noted No
S5-113030 CR 32.422 R11 Add MDT support for EPLMN Huawei CR agreement 6.5.2 Yes No withdrawn Yes
S5-113031 CR 32.752 R11 Add access control configuration among PLMNs Huawei CR agreement 6.5.2 Yes No withdrawn Yes
S5-113032 Discussion paper of MDT on RAN sharing Scenario with PLMN validation Huawei other discussion 6.5.2 Yes Yes noted No
S5-113033 CR 32.421 R11 Add MDT support requirements in RAN sharing scenario Huawei CR agreement 6.5.2 Yes Yes revised No S5-113212
S5-113034 Discussion paper on solution for supporting mulitple cells in one area based MDT Job Huawei other discussion 6.5.2 Yes Yes noted No
S5-113035 CR 32.442 R11 Support multiple cells in area based MDT Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113036 CR 32.422 R11 Support multiple cells in area based MDT Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113037 CR 32.423 R11 Support multiple cells in area based MDT Huawei CR agreement 6.5.2 Yes Yes withdrawn Yes
S5-113038 Introduction of suspending and resuming ANR report distribution Huawei other discussion 6.6.1 Yes Yes noted No
S5-113039 CR R11 32.511 Suspending and resuming of ANR report distribution Huawei CR agreement 6.6.1 Yes Yes not addressed No
S5-113040 CR R11 32.500 Adding requirement for SON coordination Huawei CR agreement 6.6.2 Yes Yes revised No S5-113166
S5-113041 CR R11 32.522 Adding definition of SON coordination Huawei CR agreement 6.6.2 Yes Yes revised No S5-113167
S5-113042 pCR 32.834 Add inter-RAT ES architectures Huawei pseudo CR approval 6.7.4 Yes Yes revised No S5-113207
S5-113043 R8 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes revised No S5-113150
S5-113044 R8 CR 32298 Control plane address used in CDR field Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-113045 R9 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes revised No S5-113151
S5-113046 R9 CR 32298 Control plane address used in CDR field Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-113047 R10 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes revised No S5-113152
S5-113048 R10 CR 32298 Control plane address used in CDR field Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-113049 R8 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 Yes Yes revised No S5-113153
S5-113050 R9 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 Yes Yes revised No S5-113154
S5-113051 R10 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 Yes Yes revised No S5-113155
S5-113052 R8 CR 32298 Remove the Size Limitation to ChargingRuleBaseName Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-113053 R9 CR 32298 Remove the Size Limitation to ChargingRuleBaseName Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-113054 R10 CR 32298 Remove the Size Limitation to ChargingRuleBaseName Huawei CR agreement 7.3 Yes No withdrawn Yes
S5-113055 Include Wi-Fi as RAT 2 Technology Intel other discussion 6.7.4 Yes Yes noted No
S5-113056 WLAN Network Management Intel other discussion 6.4.3 Yes Yes noted No
S5-113057 Clarification of UE attachment in ESM concept Intel pseudo CR approval 6.7.4 Yes Yes approved No
S5-113058 Inter-RAT energy saving Requirements Intel pseudo CR discussion 6.7.4 Yes Yes revised No S5-113208
S5-113059 Addition of HeNB configuration parameters for EARFCN Qualcomm CDMA Technologies CR agreement 6.3 Yes Yes agreed No
S5-113060 Draft LS to BBF on addition of configuration parameters for EARFCN in TR-196 Qualcomm CDMA Technologies o/g LS approval 6.3 Yes Yes revised No S5-113114
S5-113061 pCR 32.8xy Add Specification level requirements ZTE pseudo CR approval 6.7.5 Yes Yes revised No S5-113204
S5-113062 pCr 32.834 Add a new statistical ESM variant ZTE pseudo CR approval 6.7.4 Yes Yes noted No
S5-113063 Rel-11 CR 32.426 Removal of hanging paragraphs Huawei CR agreement 6.3 Yes Yes revised No S5-113115
S5-113064 Skeleton for TR 32.858 for UMONC SID Huawei Draft TS/TR discussion 7.5.1 Yes Yes noted No
S5-113065 CR R11 32.409 Deletion of PCRF related measurements China Mobile CR agreement 6.5.1 Yes Yes revised No S5-113125
S5-113066 CR R11 32.426 Addition of PCRF related measurements China Mobile CR agreement 6.5.3 Yes Yes revised No S5-113126
S5-113067 CR R11 32.426 Addition of credit re-authorization procedure related measurements China Mobile CR agreement 6.5.3 Yes Yes revised No S5-113127
S5-113068 CR R11 32.426 Addition of IP-CAN session termination related measurements China Mobile CR agreement 6.5.3 Yes Yes revised No S5-113128
S5-113069 CR R11 32.426 Addition of update location by S6a related measurements China Mobile CR agreement 6.5.3 Yes Yes noted No
S5-113070 CR R11 32.426 Addition of authentication by S6a related measurements China Mobile CR agreement 6.5.3 Yes Yes noted No
S5-113071 Inter-RAT ESM concept to support idle mode UE Intel other discussion 6.7.4 Yes Yes revised No S5-113209
S5-113072 Reply to: S5-112268 BBF Response to SA5 Liaison (S5-111514) and Straw Ballot for TR-196i2 and TR-262 SA5 o/g LS approval 6.1 Yes Yes revised No S5-113269
S5-113073 pCR The skeleton for 3GPP interworking WLAN China Mobile pseudo CR approval 6.4.3 Yes Yes revised No S5-113186
S5-113074 pCR The skeleton for evolved 3GPP interworking WLAN NRM IRP requirements China Mobile pseudo CR approval 6.4.3 Yes Yes revised No S5-113187
S5-113075 pCR The skeleton for UMTS interworking WLAN PM China Mobile pseudo CR approval 6.4.3 Yes Yes revised No S5-113188
S5-113076 pCR The skeleton for evolved 3GPP interworking WLAN PM China Mobile pseudo CR approval 6.4.3 Yes Yes revised No S5-113189
S5-113077 pCR Identify NRM IRP requirements for 3GPP interworking WLAN management China Mobile pseudo CR approval 6.4.3 Yes Yes merged in S5-113186 No
S5-113078 pCR Identify NRM IRP requirements for evolved 3GPP interworking WLAN management China Mobile pseudo CR approval 6.4.3 Yes Yes merged in S5-113187 No
S5-113079 CR R11 32.762 Add Carrier Aggregation related attribute ZTE CR agreement 6.4.2 Yes Yes noted No
S5-113080 Rel-11 CR Remove inconsistency to align the MDT parameters with RAN implementation Nokia Siemens Networks CR agreement 6.5.2 Yes Yes revised No S5-113183
S5-113081 Network sharing scenarios and Equivalent PLMN issues TeliaSonera other discussion 6.1 Yes Yes noted No
S5-113082 LS on S4-SGSN Address Change Report C4-112206 i/c LS discussion 4.3 Yes No withdrawn Yes
S5-113083 LS on Correlation of charging information C1-113729 i/c LS discussion 7.1 Yes Yes postponed to the next meeting No
S5-113084 LS on Release 11 Features SP-110657 i/c LS discussion 4.3 Yes Yes noted No
S5-113085 BBF status report prior to BBF and 3GPP workshop bbf2011.1232.01 i/c LS discussion 4.3 Yes Yes replied to No
S5-113086 Response LS on service awareness in VPLMN (response to CPWP Doc 90_005/ S2-113798) CPWP 91_005rev1 i/c LS discussion 7.1 Yes Yes noted No
S5-113087 Remove association name Ericsson other discussion 6.4.1 Yes Yes approved No
S5-113088 Discussion Paper on the implications of subscription management for policy counters on the OCS architecture Openet other discussion 7.4.2 Yes Yes noted No S5-113001
S5-113089 Report of methodology coordination meetings with ITU-T Ericsson meeting report / action list discussion 4.4 Yes Yes noted No
S5-113090 Handling of the Management Based MDT Allowed IE (user consent) Nokia Siemens Networks Oy other discussion 6.5.2 Yes No withdrawn Yes
S5-113093 CR R10 32.298 Correction for IPv6 prefix in served PDP/PDN address CDR parameters for 32.298 Juniper Networks CR agreement 7.3 Yes No withdrawn Yes
S5-113094 CR R10 32.251 Correction for IPv6 prefix in served PDP/PDN address CDR parameters for 32.251 Juniper Networks CR agreement 7.3 Yes No withdrawn Yes
S5-113095 LS on S4-SGSN Address Change Report C4-112206 i/c LS discussion 7.1 Yes Yes noted No
S5-113096 Status 3GPP/TMF Model Alignment Nokia Siemens Networks other discussion 6.4.1 Yes Yes noted No
S5-113097 FMC Federated Network Model (FNM) V1.4 (S5vTMFa172) Nokia Siemens Networks other discussion 6.4.1 Yes Yes approved No
S5-113098 FMC FNM Umbrella Model V1.4 (S5vTMFa173) Nokia Siemens Networks other discussion 6.4.1 Yes Yes approved No
S5-113099 FMC FNM Model Repertoire V1.2 (S5vTMFa174) Nokia Siemens Networks other discussion 6.4.1 Yes Yes approved No
S5-113100 3GPP/TMF Concrete Model Relationships V1.0 (S5vTMFa169) Nokia Siemens Networks other discussion 6.4.1 Yes Yes approved No
S5-113101 Initial Model Alignment Working Procedures V2.0 (S5vTMFa144) Nokia Siemens Networks other discussion 6.4.1 Yes Yes approved No
S5-113102 3GPP/TMF FMH - Living List version 8 Nokia Siemens Networks other discussion 5.3 Yes Yes noted No
S5-113103 Proposed Updates to 3GPP/TMF FMH Living List version 8 Nokia Siemens Networks other discussion 5.3 No Yes revised No S5-113219
S5-113104 Enhanced Feedback (Gap Analysis) on NGMN NGCOR CONSOLIDATED REQUIREMENTS V.092 Nokia Siemens Networks other discussion 5.3 No Yes revised No S5-113218
S5-113105 CR R10 32251 Correction on duplicated parameters in S/PGW CDRs descriptions Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No
S5-113106 CR R11 32251 Correction on duplicated parameters in S/PGW CDRs descriptions Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No
S5-113107 Reply to: LS on Radio metrics with respect to QoE Qualcomm o/g LS approval 6.1 Yes Yes revised No S5-113265
S5-113108 CR R11 32.425 subcounters For Too-Late Handover Nokia Siemens Networks CR agreement 6.3 Yes Yes sent for email approval No S5-112978
S5-113109 Proposal for a new Study Item on Network Sharing Scenarios Alcatel-Lucent new WID agreement 6.1 Yes Yes revised No S5-113277
S5-113110 Rel-8 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 No Yes agreed No
S5-113111 Rel-9 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 No Yes agreed No S5-113014
S5-113112 Rel10 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 No Yes agreed No S5-113015
S5-113113 Rel11 CR to TS 32.407 Correcting measurement definitions Nokia Siemens Networks CR agreement 6.3 No Yes agreed No S5-113016
S5-113114 Draft LS to BBF on addition of configuration parameters for EARFCN in TR-196 Qualcomm, NSN o/g LS approval 6.3 Yes Yes revised No S5-113260 S5-113060
S5-113115 Rel-11 CR 32.426 Removal of hanging paragraphs Huawei, MCC CR agreement 6.3 No Yes agreed No S5-113063
S5-113116 CR R11 32409 Add the number of release before ringing and release while ringing on CSCF ZTE CR agreement 6.5.1 No Yes agreed No S5-112925
S5-113117 CR R11 32454 Add the session establishment network success rate related KPI ZTE CR agreement 6.5.1 Yes Yes sent for email approval No S5-112926
S5-113118 CR R11 32.409 Correct OIP and add OIR related measurement ZTE CR agreement 6.5.1 No Yes revised No S5-113129 S5-112927
S5-113119 CR R11 32.409 Add TIP and TIR service related measurements ZTE CR agreement 6.5.1 No Yes agreed No S5-112928
S5-113120 CR R11 32.409 Add MWI service related measurements ZTE CR agreement 6.5.1 No Yes agreed No S5-112929
S5-113121 CR R11 32.409 Add FA service related measurements ZTE CR agreement 6.5.1 No Yes agreed No S5-112930
S5-113122 CR R11 32.409 Add CRS service related measurements ZTE CR agreement 6.5.1 No Yes agreed No S5-112931
S5-113123 CR R11 32.409 Add CAT service related measurements ZTE CR agreement 6.5.1 No Yes agreed No S5-112932
S5-113124 CR R11 32.409 Add AOC service related measurements ZTE CR agreement 6.5.1 No Yes agreed No S5-112933
S5-113125 CR R11 32.409 Deletion of PCRF related measurements China Mobile CR agreement 6.5.1 No Yes agreed No S5-113065
S5-113126 CR R11 32.426 Addition of PCRF related measurements China Mobile CR agreement 6.5.3 No Yes agreed No S5-113066
S5-113127 CR R11 32.426 Addition of credit re-authorization procedure related measurements China Mobile CR agreement 6.5.3 No Yes agreed No S5-113067
S5-113128 CR R11 32.426 Addition of IP-CAN session termination related measurements China Mobile CR agreement 6.5.3 Yes Yes agreed No S5-113068
S5-113129 CR R11 32.409 Correct OIP and add OIR related measurement ZTE CR agreement 6.5.1 No Yes agreed No S5-113118
S5-113130 CR 32.652 Rel-8 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113227 S5-112981
S5-113131 CR 32.652 Rel-9 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113228 S5-112982
S5-113132 CR 32.652 Rel-10 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113229 S5-112983
S5-113133 CR 32.642 Rel-8 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113230 S5-112984
S5-113134 CR 32.642 Rel-9 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113231 S5-112985
S5-113135 CR 32.642 Rel-10 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113232 S5-112986
S5-113136 CR 32.652 Rel-8 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113233 S5-112987
S5-113137 CR 32.652 Rel-9 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113234 S5-112989
S5-113138 CR 32.652 Rel-10 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113235 S5-112991
S5-113139 CR 32.642 Rel-8 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113236 S5-112992
S5-113140 CR 32.642 Rel-9 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113237 S5-112997
S5-113141 CR 32.642 Rel-10 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113238 S5-113000
S5-113142 Reply to: BBF status report prior to BBF and 3GPP workshop CHG SWG o/g LS approval 4.3 No Yes revised No S5-113243
S5-113143 CR 32.652 Rel-11 Add IRAT ANR from UTRAN and from E-UTRAN to GERAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113239 S5-113021
S5-113144 CR 32.642 Rel-11 Add IRAT ANR from E-UTRAN to UTRAN, plus UTRAN Intra-RAT ANR Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113240 S5-113022
S5-113145 CR 32.762 Rel-11 Add IRAT ANR from UTRAN to E-UTRAN Ericsson, Huawei, ZTE CR agreement 6.6.1 No Yes revised No S5-113226 S5-113023
S5-113146 WID System Improvements for Machine Type Communication Ericsson revised WID agreement 7.2 No Yes revised No S5-113244 S5-112934
S5-113147 R11 CR 32 260 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 No Yes revised No S5-113220 S5-112855
S5-113148 R11 CR 32 298 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 No Yes revised No S5-113221 S5-112856
S5-113149 R11 CR 32.299 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 No Yes revised No S5-113222 S5-112857
S5-113150 R8 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113245 S5-113043
S5-113151 R9 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113246 S5-113045
S5-113152 R10 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113247 S5-113047
S5-113153 R8 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes revised No S5-113249 S5-113049
S5-113154 R9 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes revised No S5-113250 S5-113050
S5-113155 R10 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes revised No S5-113251 S5-113051
S5-113156 R10 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes revised No S5-113252
S5-113157 R11 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113248 S5-113152
S5-113158 CR R9 32250 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No S5-112952
S5-113159 CR R10 32250 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No S5-112953
S5-113160 CR R9 32298 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No S5-112954
S5-113161 CR R10 32298 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No S5-112955
S5-113162 NGCOR breakpout session report Ericsson meeting report / action list discussion 5.3 No Yes noted No
S5-113163 CR R11 32298 Correction on MSC-SRVCC CDRs for Suppl services and location Alcatel-Lucent CR agreement 7.3 Yes Yes agreed No S5-112956
S5-113164 R10 CR 32298 Correction on ASN.1 syntax - alignment with TS 29.002 Nokia Siemens Networks CR agreement 7.3 Yes Yes noted No S5-112858
S5-113165 R11 CR 32298 Correction on ASN.1 syntax - alignment with TS 29.002 Nokia Siemens Networks CR agreement 7.3 Yes Yes noted No S5-112871
S5-113166 CR R11 32.500 Adding requirement for SON coordination Huawei CR agreement 6.6.2 No Yes revised No S5-113241 S5-113040
S5-113167 CR R11 32.522 Adding definition of SON coordination Huawei CR agreement 6.6.2 No Yes agreed No S5-113041
S5-113168 Discussion paper on IPv4 address usage ZTE other discussion 7.3 No Yes noted No
S5-113169 CR R10 32.421 Add MDT data deletion Note Nokia Siemens Networks CR agreement 6.5.2 Yes Yes agreed No
S5-113170 CR R11 32.421 Add MDT data deletion Note Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113194
S5-113171 Rel-11 CR 32.260 Addition of Served user Ericsson CR agreement 7.3 No Yes revised No S5-113254 S5-112935
S5-113172 Reply to: Reply LS on Minimization of Drive Tests (MDT) privacy SA5 o/g LS approval 6.5.2 Yes Yes approved No
S5-113173 LS to CT3 on Rating Group change handling CHG SWG o/g LS approval 7.1 No Yes noted No
S5-113174 Rel-11 CR 32.296 Editorial Change Rc Reference Point Huawei CR agreement 7.3 No Yes revised No S5-113255 S5-112950
S5-113175 32.421 R10 MDT Data Controller requirements Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113190 S5-112882
S5-113176 32.421 R11 MDT Data Controller requirements Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113191 S5-112883
S5-113177 32.422 R10 restrict UE selection Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113192 S5-112886
S5-113178 32.422 R11 restrict UE selection Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113193 S5-112887
S5-113179 32.422 R10 restrict MDT retrieval Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113215 S5-112888
S5-113180 32.422 R11 restrict MDT retrieval Nokia Siemens Networks CR agreement 6.5.2 No Yes revised No S5-113216 S5-112889
S5-113181 LSout to CT1 on ICID handling when more then one ICID is used for SIP session CHG SWG o/g LS approval 7.1 No Yes revised No S5-113258
S5-113182 Remove inconsistency to align the MDT parameters with RAN implementation Nokia Siemens Networks CR agreement 6.5.2 No Yes agreed No S5-113017
S5-113183 Rel-11 CR Remove inconsistency to align the MDT parameters with RAN implementation Nokia Siemens Networks CR agreement 6.5.2 No Yes agreed No S5-113080
S5-113184 R11 CR 32298 Remove the Size Limitation to ChargingRuleBaseNameand Huawei CR agreement 7.3 No Yes revised No S5-113262
S5-113185 CR R11 32.425 Add statement about applicability of measurement to CA Nokia Siemens Networks CR discussion 6.4.2 No Yes revised No S5-113225
S5-113186 pCR The skeleton for 3GPP interworking WLAN China Mobile pseudo CR approval 6.4.3 No Yes approved No S5-113073
S5-113187 pCR The skeleton for EPS interworking WLAN NRM IRP requirements China Mobile pseudo CR approval 6.4.3 No Yes revised No S5-113261 S5-113074
S5-113188 pCR The skeleton for UMTS interworking WLAN PM China Mobile pseudo CR approval 6.4.3 Yes Yes sent for email approval No S5-113075
S5-113189 pCR The skeleton for evolved 3GPP interworking WLAN PM China Mobile pseudo CR approval 6.4.3 Yes Yes approved No S5-113076
S5-113190 32.421 R10 MDT Data Controller requirements Nokia Siemens Networks CR agreement 6.5.2 No Yes agreed No S5-113175
S5-113191 32.421 R11 MDT Data Controller requirements Nokia Siemens Networks CR agreement 6.5.2 No Yes agreed No S5-113176
S5-113192 32.422 R10 restrict UE selection Nokia Siemens Networks CR agreement 6.5.2 Yes Yes agreed No S5-113177
S5-113193 32.422 R11 restrict UE selection Nokia Siemens Networks CR agreement 6.5.2 Yes Yes agreed No S5-113178
S5-113194 CR R11 32.421 Add MDT data deletion Note Nokia Siemens Networks CR agreement 6.5.2 Yes Yes agreed No S5-113170
S5-113195 LS on formal aspects to be considered for the 3GPP-TMF Joint Working Groups Nokia Siemens Networks o/g LS discussion 5.3 Yes Yes revised No S5-113253
S5-113196 Reply to: LS on MDT and RAN Sharing SA5 o/g LS approval 6.5.2 Yes Yes revised No S5-113214
S5-113197 Rel-11 CR 32.296 Function Definition of OCS for Sy Huawei CR agreement 7.4.2 No Yes agreed No S5-112951
S5-113198 pCR TR 32.834 prioritization between Inter-RAT and LTE Energy Saving KPN, Nokia Siemens Networks, NEC pseudo CR approval 6.7.4 No Yes approved No S5-112940
S5-113199 Rel-11 CR 32.240 Introduction of Sy reference point on charging architecture and information flows ZTE CR agreement 7.4.2 No Yes revised No S5-113263 S5-112960
S5-113200 Discussion Paper to Initiate the Preparation of a Presentation on the OCS Architecture and Functionalities Relevant Sy to CT3 Openet other discussion 7.4.2 No Yes approved No S5-112979
S5-113201 Requirement and Solutions for Statistical Energy Saving Management Nokia Siemens Networks, Deutsche Telekom pseudo CR approval 6.7.4 No Yes approved No S5-113026
S5-113202 32.901-Disclaimer that IOCs do not replace existing 3GPP IOCs Alcatel-Lucent pseudo CR approval 6.7.3 No Yes approved No S5-112946
S5-113203 32.901-Clarify that MMTel IOC is transparent to applications Alcatel-Lucent pseudo CR approval 6.7.3 Yes Yes approved No S5-112947
S5-113204 pCR 32.8xy Add Specification level requirements ZTE pseudo CR approval 6.7.5 Yes Yes sent for email approval No S5-113061
S5-113205 pCR Add section 6 text in order to close the study and remove Annex A Alcatel-Lucent pseudo CR approval 6.7.3 Yes Yes approved No
S5-113206 Presentation sheet of 32.901 Alcatel-Lucent presentation sheet agreement 6.7.3 Yes Yes revised No S5-113280
S5-113207 pCR 32.834 Add inter-RAT ES architectures Huawei pseudo CR approval 6.7.4 No Yes revised No S5-113267 S5-113042
S5-113208 Inter-RAT energy saving Requirements Intel pseudo CR discussion 6.7.4 No Yes revised No S5-113268 S5-113058
S5-113209 Inter-RAT ESM concept to support idle mode UE Intel pseudo CR discussion 6.7.4 Yes Yes approved No S5-113071
S5-113210 CR R10 32 421 Correction of figure 4.2.1 Architecture for Management Based ActivationDeactivation Huawei, Orange CR agreement 6.3 Yes Yes revised No S5-113223 S5-112988
S5-113211 CR R11 32 421 Correction of figure 4.2.1 Architecture for Management Based ActivationDeactivation Huawei, Orange CR agreement 6.3 Yes Yes revised No S5-113224 S5-112990
S5-113212 CR 32.421 R11 Add MDT support requirements in RAN sharing scenario Huawei CR agreement 6.5.2 No Yes agreed No S5-113033
S5-113213 LS on MDT positioning Ericsson o/g LS approval 6.5.2 Yes Yes revised No S5-113278
S5-113214 Reply to: LS on MDT and RAN Sharing SA5 o/g LS approval 6.5.2 No Yes approved No S5-113196
S5-113215 32.422 R10 restrict MDT retrieval Nokia Siemens Networks CR agreement 6.5.2 No Yes agreed No S5-113179
S5-113216 32.422 R11 restrict MDT retrieval Nokia Siemens Networks CR agreement 6.5.2 No Yes agreed No S5-113180
S5-113217 Enhanced Reply LS to NGMN NGCOR on Project NGCOR Update CHG SWG o/g LS approval 5.3 Yes Yes revised No S5-113242
S5-113218 Enhanced Feedback (Gap Analysis) on NGMN NGCOR CONSOLIDATED REQUIREMENTS V.092 Nokia Siemens Networks other discussion 5.3 Yes Yes approved No S5-113104
S5-113219 Proposed Updates to 3GPP/TMF FMH Living List version 8 Nokia Siemens Networks other discussion 5.3 Yes Yes approved No S5-113103
S5-113220 R11 CR 32 260 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 No Yes agreed No S5-113147
S5-113221 R11 CR 32 298 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 No Yes agreed No S5-113148
S5-113222 R11 CR 32.299 Add Transit IOI to IMS Offline Charging Deutsche Telekom CR agreement 7.4.3 No Yes agreed No S5-113149
S5-113223 CR R10 32 421 Correction of figure 4.2.1 Architecture for Management Based ActivationDeactivation Huawei, Orange CR agreement 6.3 Yes No withdrawn Yes S5-113210
S5-113224 CR R11 32 421 Correction of figure 4.2.1 Architecture for Management Based ActivationDeactivation Huawei, Orange CR agreement 6.3 No No withdrawn Yes S5-113211
S5-113225 CR R11 32.425 Add statement about applicability of measurement to CA Nokia Siemens Networks CR discussion 6.4.2 No Yes noted No S5-113185
S5-113226 CR 32.762 Rel-11 Add IRAT ANR from UTRAN to E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113145
S5-113227 CR 32.652 Rel-8 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113130
S5-113228 CR 32.652 Rel-9 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113131
S5-113229 CR 32.652 Rel-10 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113132
S5-113230 CR 32.642 Rel-8 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113133
S5-113231 CR 32.642 Rel-9 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113134
S5-113232 CR 32.642 Rel-10 Add Neighbour cell Relation towards E-UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113135
S5-113233 CR 32.652 Rel-8 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113136
S5-113234 CR 32.652 Rel-9 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113137
S5-113235 CR 32.652 Rel-10 Add IRAT ANR to GERAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113138
S5-113236 CR 32.642 Rel-8 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113139
S5-113237 CR 32.642 Rel-9 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113140
S5-113238 CR 32.642 Rel-10 Add IRAT ANR to UTRAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113141
S5-113239 CR 32.652 Rel-11 Add IRAT ANR from UTRAN and from E-UTRAN to GERAN Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113143
S5-113240 CR 32.642 Rel-11 Add IRAT ANR from E-UTRAN to UTRAN, plus UTRAN Intra-RAT ANR Ericsson, Huawei, ZTE, Nokia Siemens Networks CR agreement 6.6.1 No Yes agreed No S5-113144
S5-113241 CR R11 32.500 Adding requirement for SON coordination Huawei CR agreement 6.6.2 Yes Yes agreed No S5-113166
S5-113242 Enhanced Reply LS to NGMN NGCOR on Project NGCOR Update Nokia Siemens Networks o/g LS approval 5.3 Yes Yes approved No S5-113217
S5-113243 Reply to: BBF status report prior to BBF and 3GPP workshop CHG SWG o/g LS approval 4.3 No Yes approved No S5-113142
S5-113244 WID System Improvements for Machine Type Communication Ericsson revised WID agreement 7.2 No Yes approved No S5-113146
S5-113245 R8 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113270 S5-113150
S5-113246 R9 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113271 S5-113151
S5-113247 R10 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113272 S5-113152
S5-113248 R11 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 No Yes revised No S5-113273 S5-113157
S5-113249 R8 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes agreed No S5-113153
S5-113250 R9 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes agreed No S5-113154
S5-113251 R10 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes agreed No S5-113155
S5-113252 R10 CR 32298 Correction on RatingGroupId and ResultCode range Huawei CR agreement 7.3 No Yes agreed No S5-113156
S5-113253 LS on formal aspects to be considered for the 3GPP-TMF Joint Working Groups Nokia Siemens Networks o/g LS discussion 5.3 Yes Yes revised No S5-113276 S5-113195
S5-113254 Rel-11 CR 32.260 Addition of Served user Ericsson CR agreement 7.3 No Yes agreed No S5-113171
S5-113255 Rel-11 CR 32.296 Editorial Change Rc Reference Point Huawei CR agreement 7.3 Yes Yes revised No S5-113274 S5-113174
S5-113256 3GPP – WFA collaboration Intel, China Mobile, AT&T other discussion 6.4.3 Yes Yes noted No
S5-113257 Liaison Statement to WFA Intel, China Mobile, AT&T o/g LS approval 6.4.3 Yes Yes revised No S5-113259
S5-113258 LSout to CT1 on ICID handling when more then one ICID is used for SIP session CHG SWG o/g LS approval 7.1 No Yes approved No S5-113181
S5-113259 Liaison Statement to WFA Intel, China Mobile, AT&T o/g LS approval 6.4.3 Yes Yes revised No S5-113264 S5-113257
S5-113260 LS to BBF on addition of configuration parameters for EARFCN in TR-196 Qualcomm, Nokia Siemens Networks o/g LS approval 6.3 Yes Yes revised No S5-113266 S5-113114
S5-113261 pCR The skeleton for EPS interworking WLAN NRM IRP requirements China Mobile pseudo CR approval 6.4.3 Yes Yes sent for email approval No S5-113187
S5-113262 R11 CR 32298 Remove the Size Limitation to ChargingRuleBaseNameand Huawei CR agreement 7.3 Yes Yes revised No S5-113275 S5-113184
S5-113263 Rel-11 CR 32.240 Introduction of Sy reference point on charging architecture and information flows ZTE CR agreement 7.4.2 Yes Yes agreed No S5-113199
S5-113264 Liaison Statement to WFA Intel, China Mobile, AT&T o/g LS approval 6.4.3 Yes Yes noted No S5-113259
S5-113265 Reply to: LS on Radio metrics with respect to QoE Qualcomm o/g LS approval 6.1 No Yes approved No S5-113107
S5-113266 LS to BBF on addition of configuration parameters for EARFCN in TR-196 Qualcomm, Nokia Siemens Networks o/g LS approval 6.3 Yes Yes approved No S5-113260
S5-113267 pCR 32.834 Add inter-RAT ES architectures Huawei pseudo CR approval 6.7.4 No Yes approved No S5-113207
S5-113268 Inter-RAT energy saving Requirements Intel pseudo CR discussion 6.7.4 Yes Yes approved No S5-113208
S5-113269 Reply to: S5-112268 BBF Response to SA5 Liaison (S5-111514) and Straw Ballot for TR-196i2 and TR-262 SA5 o/g LS approval 6.1 Yes Yes revised No S5-113279 S5-113072
S5-113270 R8 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes agreed No S5-113245
S5-113271 R9 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes agreed No S5-113246
S5-113272 R10 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes agreed No S5-113247
S5-113273 R11 CR 32251 Control plane address used in CDR field Huawei CR agreement 7.3 Yes Yes agreed No S5-113248
S5-113274 Rel-11 CR 32.296 Editorial Change Rc Reference Point Huawei CR agreement 7.3 Yes Yes agreed No S5-113255
S5-113275 R11 CR 32298 Remove the Size Limitation to ChargingRuleBaseNameand Huawei CR agreement 7.3 Yes Yes agreed No S5-113262
S5-113276 LS on formal aspects to be considered for the 3GPP-TMF Joint Working Groups Nokia Siemens Networks o/g LS discussion 5.3 Yes Yes approved No S5-113253
S5-113277 Proposal for a new Study Item on Network Sharing Scenarios Alcatel-Lucent new WID agreement 6.1 Yes Yes approved No S5-113109
S5-113278 LS on MDT positioning Ericsson o/g LS approval 6.5.2 No Yes sent for email approval No S5-113213
S5-113279 Reply to: S5-112268 BBF Response to SA5 Liaison (S5-111514) and Straw Ballot for TR-196i2 and TR-262 SA5 o/g LS approval 6.1 No Yes revised Yes S5-113281 S5-113269
S5-113280 Presentation sheet of 32.901 Alcatel-Lucent presentation sheet agreement 6.7.3 No Yes agreed No S5-113206
S5-113281 Reply to: S5-112268 BBF Response to SA5 Liaison (S5-111514) and Straw Ballot for TR-196i2 and TR-262 SA5 o/g LS approval 6.1 No Yes approved No S5-113279