Tdoc List

2016-02-24 08:32

Tdoc Title Source Doc-type Doc-for Agenda Avail Treated Decision Wdrn Replaced-by Replaces
C4-161000 Agenda CT4 Chairman agenda Information 2 Yes Yes noted No
C4-161001 Detailed agenda & time plan for CT4#72: status at document deadline CT4 Chairman agenda Information 2 Yes Yes noted No
C4-161002 Detailed agenda & time plan for CT4#71: status on eve of meeting CT4 Chairman agenda Information 2 Yes Yes noted No
C4-161003 Proposed allocation of documents to agenda items for CT4#71: status at document deadline CT4 Chairman agenda Information 2 Yes Yes noted No
C4-161004 Proposed allocation of documents to agenda items for CT4#68bis: status on eve of meeting Alcatel-Lucent Telecom Ltd agenda Approval 2 Yes Yes noted No
C4-161005 CT4 previous meeting report for approval MCC report Approval 3 Yes Yes approved No
C4-161006 CT/SA #70 Status report Chairman report Information 3 Yes Yes noted No
C4-161007 Release of WebRTC Data Channels Alcatel-Lucent CR Approval 7.1.8 Yes Yes revised No C4-161273
C4-161008 WebRTC Data Channels Alcatel-Lucent CR Approval 7.1.8 Yes Yes revised No C4-161274
C4-161009 WebRTC gateway configuration for end-to-end WebRTC calls (stage 2) Alcatel-Lucent CR Approval 7.2.12 Yes Yes withdrawn Yes
C4-161010 WebRTC gateway configuration for end-to-end WebRTC calls (stage 3) Alcatel-Lucent CR Approval 7.2.12 Yes Yes revised No C4-161369
C4-161011 TrGW configuration for end-to-end WebRTC calls (stage 3) Alcatel-Lucent CR Approval 7.2.12 Yes Yes revised No C4-161370
C4-161012 H.248 WebRTC gateway bearer plane interworking for end-to-end WebRTC traffic Alcatel-Lucent discussion Information 7.2.12 Yes Yes noted No
C4-161013 QoS end-to-end MTSI extensions: possible impact on H.248 packet gateways Alcatel-Lucent discussion Discussion 7.2.3 Yes Yes noted No
C4-161014 IMS-WebRTC Rel-14: potential enhancements for IMS-WebRTC gateways Alcatel-Lucent discussion Discussion 8.2.5 Yes Yes noted No
C4-161015 Alternate IP Connectivity: upgrade options for ALTC support by H.248 gateways Alcatel-Lucent discussion Information 8.1.16 Yes Yes noted No
C4-161016 Clarification of EVS codec support by 3GPP H.248 Media Gateways Alcatel-Lucent discussion Discussion 8.1.19 Yes Yes noted No
C4-161017 LS on NBIFOM procedure in SCM and RAN rules handling parameter 3GPP TSG CT WG1 LS in Discussion 7.2.6 Yes Yes noted No
C4-161018 Reply LS on Disconnection of NBIFOM PDN Connection with the Cause "Reactivation Requested" 3GPP TSG CT WG1 LS in Discussion 7.2.6 Yes Yes noted No
C4-161019 Reply LS on Mapping table between GTPv2 S2a and WLCPDiameter 3GPP TSG CT WG1 LS in Discussion 8.3.1 Yes Yes noted No
C4-161020 LS on issues related to MT SMS over SGs delivery in eDRX 3GPP TSG CT WG1 LS in 7.2.10 Yes Yes noted No
C4-161021 LS on MCPTT Group data and affiliation 3GPP TSG CT WG1 LS in Discussion 7.2.11 Yes Yes noted No
C4-161022 LS on questions on CIoT 3GPP TSG CT WG1 LS in Discussion 7.2.14 Yes Yes noted No
C4-161023 Reply LS on OCS address for Gy and Gyn inter-PLMN 3GPP TSG CT WG3 LS in Discussion 4 Yes Yes noted No
C4-161024 LS on the decision of NBIFOM mode 3GPP TSG CT WG3 LS in Discussion 7.2.6 Yes Yes noted No
C4-161025 LS on Request for Diameter Command Code and Application ID for new St Interface 3GPP TSG CT WG3 LS in Discussion 4 Yes Yes noted No
C4-161026 Reply LS on the Setting of Delay Tolerant Connection Indication 3GPP TSG CT WG3 LS in Discussion 7.2.10 Yes Yes noted No
C4-161027 Reply LS on Multi-stream Multiparty Conferencing Media Handling 3GPP TSG CT WG3 LS in Discussion 4 Yes Yes noted No
C4-161028 NG PACKET LS to Standardization groups on PMIP removal GSMA PACKET #83 LS in Discussion 4 Yes Yes noted No
C4-161029 LS on extension to field length of PDCP Sequence Number 3GPP TSG RAN WG2 LS in Discussion 7.3.11 Yes Yes noted No
C4-161030 LS on extension to field length of PDCP Sequence Number 3GPP TSG RAN WG2 LS in Discussion 7.3.11 Yes Yes replied to No
C4-161031 Reply LS on 3GPP Work on Explicit Congestion Notification for Lower Layer Protocols 3GPP TSG RAN WG2 LS in Discussion 4 Yes Yes noted No
C4-161032 Response LS on Conclusions from TR 23.712 on Warning Status Reporting 3GPP TSG RAN WG3 LS in Discussion 7.2.4 Yes Yes noted No
C4-161033 LS on S1 signalling solutions for non-NB-IoT UEs 3GPP TSG RAN LS in Discussion 7.2.14 Yes Yes noted No
C4-161034 Reply LS on clarification on requirements for AESE 3GPP TSG SA WG2 LS in Discussion 7.2.8 Yes Yes noted No
C4-161035 Reply LS on clarification on requirements for MONTE 3GPP TSG SA WG2 LS in Discussion 7.1.9 Yes Yes replied to No
C4-161036 LS on Network asserted WLAN Location Information for PDN connection establishment over S2b 3GPP TSG SA WG2 LS in Discussion 7.2.9 Yes Yes noted No
C4-161037 LS on Mobile Equipment Identity Signalling over WLAN 3GPP TSG SA WG2 LS in Discussion 4 Yes Yes noted No
C4-161038 LS on Retrieval of UE Usage Type from HSS 3GPP TSG SA WG2 LS in Discussion 7.1.18 Yes Yes noted No
C4-161039 Reply LS on proposed extension to GUSS to include AS address 3GPP TSG SA WG2 LS in Discussion 4 Yes Yes noted No
C4-161040 LS on Packet switched conversational multimedia applications TS 26.235 and TS 26.236 3GPP TSG SA WG4 LS in Discussion 7.3.9 Yes Yes noted No
C4-161041 Reply LS on 3GPP Work on Explicit Congestion Notification for Lower Layer Protocols 3GPP TSG SA LS in Discussion 4 Yes Yes noted No
C4-161042 Reply LS on questions on CIoT 3GPP TSG RAN WG2 NB-IOT Ad-hoc LS in Discussion 7.2.14 Yes Yes noted No
C4-161043 Multi-stream Multiparty Conferencing Media Handling Ericsson discussion Discussion 5 Yes Yes noted No
C4-161044 CT aspects of MTSI Extension on Multi-stream Multiparty Conferencing Media Handling Ericsson WID new Agreement 5 Yes Yes revised No C4-161301
C4-161045 Removal of references to TS 26.235 Ericsson CR 7.3.9 Yes Yes revised No C4-161371
C4-161046 Removal of references to TS 26.235 Ericsson CR 7.3.9 Yes Yes agreed No
C4-161047 Removal of references to TS 26.236 Ericsson CR 7.3.9 Yes Yes revised No C4-161372
C4-161048 Removal of references to TS 26.236 Ericsson CR 7.3.9 Yes Yes agreed No
C4-161049 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR 7.2.3 Yes Yes revised No C4-161330
C4-161050 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR 7.2.3 Yes Yes revised No C4-161331
C4-161051 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR 7.2.3 Yes Yes revised No C4-161332
C4-161052 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR 7.2.3 Yes Yes revised No C4-161333
C4-161053 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR 7.2.3 Yes Yes revised No C4-161334
C4-161054 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR 7.2.3 Yes Yes revised No C4-161335
C4-161055 SCC AS Restoration China Mobile WID new 5 Yes Yes revised No C4-161302
C4-161056 eProSe-Ext-CT impacts Qualcomm Incorporated discussion Information 7.2.7 Yes Yes noted No
C4-161057 Addition of ProSe Application Code Prefix and ProSe Application Code Suffix formats Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes revised No C4-161374
C4-161058 Resolution of Editor’s notes on EVS over UMTS CS Qualcomm Incorporated CR Agreement 7.1.7 Yes Yes revised No C4-161327
C4-161059 Resolution of Editor’s note on EVS over UMTS CS Qualcomm Incorporated CR Agreement 7.1.7 Yes Yes agreed No
C4-161060 Pseudo-CR on Removing Editor's Note on IWK-SCEF Authorization and Configuration Failure at IWK-SCEF Cisco Systems Inc pCR Approval 7.1.9 Yes Yes revised No C4-161462
C4-161061 Notifying the status of MONTE event configuration at the IWK-SCEF to the HSS Cisco Systems Inc CR Approval 7.1.9 Yes Yes revised No C4-161346
C4-161062 Requested Retransmission Time in MT-Forward-SM response Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.2.10 Yes Yes agreed No
C4-161063 Application ID for St Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes agreed No
C4-161064 AVP code range reservation for 32.299 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes revised No C4-161241
C4-161065 Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration ZTE/Joy CR Agreement 9.8 Yes Yes revised No C4-161449
C4-161066 Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration ZTE/Joy CR Agreement 9.8 Yes Yes revised No C4-161450
C4-161067 Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration ZTE/Joy CR Agreement 9.8 Yes Yes revised No C4-161451
C4-161068 An Issue on HSS failure recover procedure NEC EUROPE LTD discussion Decision 7.3.4 Yes Yes noted No
C4-161069 Fix the issue on HSS restart procedure NEC EUROPE LTD CR Decision 7.3.4 Yes Yes not pursued No C4-151951
C4-161070 Fix the issue on HSS restart procedure NEC EUROPE LTD CR Approval 7.3.4 Yes Yes revised No C4-161360
C4-161071 User Plane Integrity Protection Indicator Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.10 Yes Yes revised No C4-161316
C4-161072 User Plane Integrity Protection Indicator Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.10 Yes Yes revised No C4-161317
C4-161073 User Plane Integrity Protection Indicator Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.10 Yes Yes revised No C4-161318
C4-161074 Implicit Identities for PSI Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.7 Yes Yes merged No C4-161344
C4-161075 Discussion on status of MONTE work Huawei discussion Discussion 7.1.9 Yes Yes revised No C4-161203
C4-161076 Pseudo-CR on cleanup of 29.128 Huawei pCR Decision 7.1.9 Yes Yes revised No C4-161288
C4-161077 AVAILABILITY_AFTER_DDN_FAILURE reporting Huawei CR Decision 7.1.9 Yes Yes revised No C4-161348
C4-161078 Reporting of overload by the SCEF Huawei CR Decision 7.1.9 Yes Yes withdrawn Yes
C4-161079 Clarification on usage of P and T needs Huawei CR Decision 7.1.9 Yes Yes revised No C4-161350
C4-161080 Pseudo-CR on overload Huawei pCR Decision 7.1.9 Yes Yes revised No C4-161352
C4-161081 HSS restart MONTE impacts Huawei CR Decision 7.1.9 Yes Yes revised No C4-161354
C4-161082 Restart of SCEF Huawei CR Decision 7.1.9 Yes Yes revised No C4-161358
C4-161083 SCEF and HSS Restart Huawei CR Decision 7.1.9 Yes Yes revised No C4-161454
C4-161084 Reporting of the start and stop of the reporting of monitoring events Huawei, Cisco Systems Inc CR Decision 7.1.9 Yes Yes revised No C4-161359
C4-161085 Correction of AVP code and new AVP assignment Huawei CR Decision 7.1.9 Yes Yes revised No C4-161286
C4-161086 Reporting of Monitoring update result Huawei CR Decision 7.2.7 Yes Yes revised No C4-161243
C4-161087 Corrections on TS numbers Huawei CR Decision 7.3.2 Yes Yes revised No C4-161444
C4-161088 Introduction of AAA-1 interface Huawei CR Decision 7.2.11 Yes Yes revised No C4-161244 C4-160021
C4-161089 Data returned in IMSPublicIdentity correction, new EnhancedPublicIdentifiers class Ericsson CR 7.3.7 Yes Yes revised No C4-161263
C4-161090 De-registration of emergency registration correction Ericsson CR 7.3.7 Yes Yes agreed No
C4-161091 Local Time Zone for CS retrieval Ericsson CR 7.3.7 Yes Yes revised No C4-161387
C4-161092 Remove the default access AVP Huawei CR 7.2.6 Yes Yes agreed No
C4-161093 Remove the default access AVP Huawei CR 7.2.6 Yes Yes agreed No
C4-161094 Update the reference for NBIFOM container Huawei CR 7.2.6 Yes Yes agreed No
C4-161095 Specific AVP codes for NBIFOM Huawei CR 7.2.6 Yes Yes agreed No
C4-161096 Add cause values to TWAN mapping table Huawei CR 8.3.1 Yes Yes revised No C4-161356
C4-161097 Add cause values to TWAN mapping table Huawei CR 8.3.1 Yes Yes revised No C4-161357
C4-161098 Extension on TWAN-S2a-Failure-Cause Huawei CR 7.3.3 Yes Yes agreed No
C4-161099 Authorize the UE requested APN Huawei CR 7.3.3 Yes Yes revised No C4-161312
C4-161100 SCS Identity Format Hewlett-Packard Enterprise discussion Discussion 9.13.2 Yes Yes noted No
C4-161101 SCS identity format Hewlett-Packard Enterprise CR Agreement 9.13.2 Yes Yes noted No
C4-161102 SCS identity format Hewlett-Packard Enterprise CR Agreement 9.13.2 Yes Yes postponed No
C4-161103 SCS identity format Hewlett-Packard Enterprise CR Agreement 9.13.2 Yes Yes postponed No
C4-161104 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161386
C4-161105 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161106 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 No Yes withdrawn Yes
C4-161107 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161108 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161109 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161389
C4-161110 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161390
C4-161111 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161112 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161113 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161114 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes withdrawn Yes
C4-161115 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161391
C4-161116 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161392
C4-161117 Inter-PLMN discovery transmission support Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes revised No C4-161375
C4-161118 Adding security related parameters for restricted ProSe direct discovery authorization Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes revised No C4-161376
C4-161119 Support open discovery with application-controlled extension Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes revised No C4-161377
C4-161120 Discovery update for open and restricted ProSe direct discovery Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes agreed No
C4-161121 Octet number in MM context IE Huawei CR Agreement 7.3.1 Yes Yes agreed No
C4-161122 Protocol Type in Create Session Request Huawei CR Agreement 7.3.1 Yes Yes revised No C4-161349
C4-161123 Correct the partial failure handling on SGW Huawei CR Agreement 7.3.4 Yes Yes revised No C4-161361
C4-161124 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161394
C4-161125 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161396
C4-161126 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161397
C4-161127 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes revised No C4-161398
C4-161128 Configure Monitoring Event to Multiple Serving Nodes ZTE CR Approval 7.1.9 Yes Yes revised No C4-161419
C4-161129 Inform the HSS of remaining number of reports ZTE CR Approval 7.1.9 Yes Yes withdrawn Yes
C4-161130 Count and Stop Monitoring Event Reports at SCEF ZTE CR Approval 7.1.9 Yes Yes revised No C4-161423
C4-161131 Allow SMS for NB-IoT UE without Combined Attach ZTE CR Approval 7.2.14 Yes Yes revised No C4-161323
C4-161132 Clarification on Reporting Cell ID for NB-IoT ZTE CR Approval 7.2.14 Yes Yes not pursued No
C4-161133 P-CSCF_RESELECTION_SUPPORT Private Status Type ZTE/Joy CR Agreement 7.1.3 Yes Yes agreed No
C4-161134 Incorrect use of the term "full hexadecimal representation" to mean binary encoding Oracle Corporation CR Approval 7.3.1 Yes Yes revised No C4-161342
C4-161135 Incorrect use of the term "full hexadecimal representation" to mean binary encoding Oracle Corporation CR Approval 7.3.1 Yes Yes revised No C4-161343
C4-161136 Adjacent PLMNs Ericsson CR 7.3.6 Yes Yes agreed No
C4-161137 Invocation of Alert procedure by HSS after ULR Ericsson CR 7.3.6 Yes Yes revised No C4-161447
C4-161138 Handover to Non-3GPP Access Not Allowed Ericsson CR 7.3.5 Yes Yes revised No C4-161309
C4-161139 Implementation Error in CR#29 Ericsson, Nextnav, MCC CR 7.1.21 Yes Yes agreed No
C4-161140 Change of type of Monitoring-Duration AVP to represent an absolute time Ericsson CR 7.1.9 Yes Yes revised No C4-161428
C4-161141 Change of type of Monitoring-Duration AVP to represent an absolute time Ericsson CR 7.1.9 Yes Yes agreed No
C4-161142 AVPs for the Rx Diameter application Ericsson CR 7.3.2 Yes Yes agreed No
C4-161143 CT4 impacts for CIoT Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks discussion Discussion 7.2.14 Yes Yes noted No
C4-161144 GTP-U tunneling over S11 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks discussion Decision 7.2.14 Yes Yes noted No
C4-161145 S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes revised No C4-161378
C4-161146 RAT-Type extension for NB-IoT Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes revised No C4-161399
C4-161147 S11-U tunneling for MO/MT data transport in control plane (SGi based) Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes revised No C4-161379
C4-161148 End Marker handling by MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes revised No C4-161381
C4-161149 S11-U Error Indication handling Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes revised No C4-161383
C4-161150 S11-U Path Failure handling Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes not pursued No
C4-161151 New Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone discussion Decision 7.2.10 Yes Yes noted No
C4-161152 Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone CR Approval 7.2.10 Yes Yes agreed No
C4-161153 Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone CR Approval 7.2.10 Yes Yes agreed No
C4-161154 Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone CR Approval 7.2.10 Yes Yes revised No C4-161271
C4-161155 Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval 7.2.10 Yes Yes agreed No
C4-161156 Correction of CR Implementation on Emergency PDN connection over untrusted WLAN MCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.9 Yes Yes agreed No
C4-161157 ePDG retrieval of WLAN Location Information Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.9 Yes Yes revised No C4-161157
C4-161158 ePDG retrieval of WLAN Location Information Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.9 Yes Yes agreed No
C4-161159 Use case for inclusion of the RAN/NAS Cause in Delete Bearer Response Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.3.1 Yes Yes agreed No
C4-161160 GTP-C Load Control - Mix of NAPTR records with "s" and "a" flags Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.3.1 Yes Yes revised No C4-161351
C4-161161 Time Zone in MAP-Any-Time-Interrogation Ericsson CR 7.3.8 Yes Yes agreed No
C4-161162 Configuration for NIDD procedure over S6t Huawei CR Decision 7.2.14 No Yes revised No C4-161193
C4-161163 Configuration for NIDD procedureover S6a Huawei CR Decision 7.2.14 No No withdrawn Yes
C4-161164 Pseudo-CR on NIDD configuration over T6a Huawei pCR Decision 7.2.14 No No withdrawn Yes
C4-161165 Definition of AVP configuration of NIDD Huawei CR Decision 7.2.14 Yes Yes revised No C4-161325
C4-161166 Storage of data for configuration of NIDD Huawei CR Decision 7.2.14 No No withdrawn Yes
C4-161167 PDN Connection Charging ID Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.2.6 Yes Yes agreed No
C4-161168 Transferring AAA identifier from the ePDG to the PGW Ericsson CR 7.3.1 Yes Yes revised No C4-161276
C4-161169 Clarification on the use of UE Usage Type Ericsson, NTT DOCOMO CR 7.1.18 Yes Yes revised No C4-161364
C4-161170 Cleanup of the editor's notes for reporting remote UE Ericsson CR 7.2.7 Yes Yes revised No C4-161385
C4-161171 Comprehension requirement for PDCP PDU Number Ericsson CR 7.3.1 Yes Yes revised No C4-161355
C4-161172 Delay Tolerant Connection Indication Ericsson, MCC CR 7.2.10 Yes Yes revised No C4-161338
C4-161173 Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure for GTPv1 Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone CR 7.2.10 Yes Yes revised No C4-161339
C4-161174 Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone CR 7.2.10 Yes Yes revised No C4-161340
C4-161175 Subscription data for combined MME/SGSN Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.6 Yes Yes revised No C4-161493
C4-161176 DNS procedures for Decor DOCOMO Communications Lab. CR Agreement 7.1.18 Yes Yes revised No C4-161363
C4-161177 AVP codes for 32.299 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes revised No C4-161277
C4-161178 AVP code range reservation for 32.299 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 8.3.7 Yes Yes revised No C4-161442
C4-161179 P-CSCF restoration not prioritized for WLAN Nokia Networks CR 7.1.3 Yes Yes revised No C4-161400
C4-161180 Result-Codes for P-CSCF Restoration Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Bell CR 7.1.3 Yes Yes revised No C4-161402
C4-161181 Prolonging PDCP PDU numbers to 18 bits Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell discussion 7.3.11 Yes Yes noted No
C4-161182 18 bits PDCP PDU Number Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.3.11 Yes Yes revised No C4-161336
C4-161183 Introduction of SGSN Group ID for Decor DOCOMO Communications Lab. CR Agreement 7.1.18 Yes Yes withdrawn Yes
C4-161184 Transfer AAA information to avoid SWx redirection ORANGE CR Approval 7.3.3 No Yes withdrawn Yes
C4-161185 WebRTC media plane optimization procedure Nokia Networks CR Agreement 7.2.12 Yes Yes revised No C4-161272
C4-161186 Provide AAA information to the PGW ORANGE CR Approval 7.3.1 Yes Yes merged No
C4-161187 Transfer AAA information to avoid HSS overload ORANGE discussion Decision 7.3.3 Yes Yes withdrawn Yes
C4-161188 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks CR Agreement 8.1.19 Yes Yes revised No C4-161416
C4-161189 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks CR Agreement 8.1.19 Yes Yes revised No C4-161417
C4-161190 Indication of P-CSCF restoration extension support over IKEv2 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Agreement 7.1.3 Yes Yes agreed No
C4-161191 Diameter message priority over S6m, S6n, S6t Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes revised No C4-161406
C4-161192 Diameter message priority over S6c, SGd, GddDiameter message priority over S6c, SGd, Gdd Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes revised No C4-161407
C4-161193 Authorisation for NIDD procedure over S6t Huawei CR Decision 7.2.14 Yes Yes revised No C4-161242 C4-161162
C4-161194 Diameter message priority over T4 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes revised No C4-161408
C4-161195 Diameter message priority over S7a/d, S13, S13’ Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes revised No C4-161411
C4-161196 Diameter message priority over PC4a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes revised No C4-161412
C4-161197 Diameter message priority over PC6/PC7 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes revised No C4-161413
C4-161198 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks CR Agreement 8.1.19 Yes Yes revised No C4-161418
C4-161199 Diameter message priority over T6a, T6ai, T6b, T6bi, T7 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC pCR Agreement 7.1.20 Yes Yes revised No C4-161414
C4-161200 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks CR 8.1.19 Yes Yes revised No C4-161420
C4-161201 Adding eNB change reporting in Location Change Reporting China Mobile Com. Corporation, ZTE, Allot Communications, China Unicom CR 6 Yes Yes postponed No C4-152135
C4-161202 MCPTT data model Ericsson CR 7.2.11 Yes Yes revised No C4-161293
C4-161203 Discussion on status of MONTE work Huawei discussion Discussion 7.1.9 Yes Yes revised No C4-161285 C4-161075
C4-161204 Result-Codes for P-CSCF Restoration Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.1.3 Yes Yes revised No C4-161405
C4-161205 New study item on PCRF failure and restoration enhancement China Mobile Com. Corporation SID new 5 Yes Yes postponed No
C4-161206 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161401
C4-161207 Discussion on non IP data transfer over T6a Cisco Systems Inc discussion Decision 7.2.14 Yes Yes revised No C4-161290
C4-161208 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Vodafone, Deutsche Telekom, Huawei CR 7.2.14 Yes Yes revised No C4-161321
C4-161209 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes No withdrawn Yes
C4-161210 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes revised No C4-161320
C4-161211 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes revised No C4-161319
C4-161212 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes revised No C4-161322
C4-161213 No Delete Session Request for non-existing PDN connection Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.2.14 Yes Yes revised No C4-161432
C4-161214 No Create Session Request for Attach without PDN connection Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.2.14 Yes Yes revised No C4-161434
C4-161215 No PCI in DDN for non-IP PDN connections Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161435
C4-161216 Behaviours upon receipt of unknown NIDD Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161436
C4-161217 Dedicated Bearer NOT allowed for Non-IP PDN connections Huawei CR Agreement 7.2.14 Yes Yes not pursued No
C4-161218 Enhance restoration procedure to be compatible with PDN connection to the SCEF Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161437
C4-161219 TAC Allocation as detailed in 3GPP TS 23.003 GSMA TSG LS in Discussion 4 Yes Yes replied to No
C4-161220 Reply LS to CT4 LS on progress of the work on Diameter Base Protocol Update 3GPP TSG SA WG5 LS in Discussion 7.1.19 Yes Yes noted No
C4-161221 LS on Charging Id assignment for NBIFOM 3GPP TSG SA WG5 LS in Discussion 7.2.6 Yes Yes replied to No
C4-161222 LS on Addition of AVP code definitions 3GPP TSG SA WG5 LS in Discussion 7.3.2 Yes Yes replied to No
C4-161223 LS on EVS over CS 3GPP TSG SA WG4 LS in Discussion 7.1.7 Yes Yes noted No
C4-161224 Reply LS on Multi-stream Multiparty Conferencing Media Handling 3GPP TSG SA WG4 LS in Discussion 4 Yes Yes noted No
C4-161225 LS on Completion of QOSE2EMTSI work item 3GPP TSG SA WG4 LS in Discussion 7.2.3 Yes Yes noted No
C4-161226 Reply LS to CT4 on RTCP Handling for FECC 3GPP TSG SA WG4 LS in Discussion 7.1.15 Yes Yes noted No
C4-161227 LS on guidance by SA2 on CIOT 3GPP TSG SA WG2 LS in Discussion 7.2.14 Yes Yes noted No
C4-161228 Response to LS on questions on CIoT 3GPP TSG SA WG2 LS in Discussion 7.2.14 Yes Yes noted No
C4-161229 Reply LS on NBIFOM procedure in SCM and RAN rules handling parameter 3GPP TSG SA WG2 LS in Discussion 7.2.6 Yes Yes noted No
C4-161230 LS on the Revocation of Discovery Filters 3GPP TSG SA WG2 LS in Discussion 8.2.4 Yes Yes noted No
C4-161231 LS on issues related to MT SMS over SGs delivery in eDRX 3GPP TSG SA WG2 LS in Discussion 7.2.10 Yes Yes noted No
C4-161232 New PDN-Type for Celular IoT Ericsson CR 7.2.14 Yes Yes revised No C4-161308
C4-161233 MO Non-IP Data procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161303
C4-161234 MT Non-IP Data procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161304
C4-161235 Connection management procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161306
C4-161236 Protocol for Non IP-Data over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161307
C4-161237 Sh* application for MCPTT-2 and CSC-13 interfaces Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks discussion Decision 7.2.11 Yes Yes withdrawn Yes
C4-161238 Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks discussion Decision 7.2.11 Yes Yes revised No C4-161479
C4-161239 Storage for CIoT control plane optimization related information at MME Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161403
C4-161240 Data model for new Application FEs’ data clarification Ericsson CR 7.2.11 Yes Yes revised No C4-161433
C4-161241 AVP code range reservation for 32.299 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes merged No C4-161277 C4-161064
C4-161242 Authorisation for NIDD procedure over S6t Huawei, Vodafone CR Decision 7.2.14 Yes Yes revised No C4-161324 C4-161193
C4-161243 Monitoring update and Reporting of update result Huawei, Orange, Telecom Italia CR Decision 7.2.7 Yes Yes revised No C4-161287 C4-161086
C4-161244 Introduction of AAA-1 interface Huawei CR Decision 7.2.11 Yes Yes revised No C4-161362 C4-161088
C4-161245 AVP Codes for 29.12 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 8.3.7 Yes Yes revised No C4-161440
C4-161246 Monitoring update and Reporting of update result Huawei CR Decision 7.2.7 Yes Yes revised No C4-161380
C4-161247 Codes for 29.212 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes revised No C4-161445
C4-161248 Allocation of new Diameter Application ID and commands code for PC2 protocol Huawei CR Decision 7.2.7 Yes Yes revised No C4-161382
C4-161249 S11-U tunneling for MO/MT data transport in control plane (SGi based) – reusing S1-U F-TEIDs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes withdrawn Yes
C4-161250 Revised WID on Controlling IMS Media Plane with SDP Capability Negotiation Huawei WID revised Agreement 5 Yes Yes withdrawn Yes CP-150238
C4-161251 Iq stage 3 to support SDP Capability Negotiation Huawei CR 7.1.12 Yes Yes revised No C4-161421
C4-161252 Ix stage 3 to support SDP Capability Negotiation Huawei CR Agreement 7.1.12 Yes Yes revised No C4-161422
C4-161253 Mp stage 3 to support SDP Capability Negotiation Huawei CR 7.1.12 Yes Yes revised No C4-161424
C4-161254 Mn stage 3 to support SDP Capability Negotiation Huawei CR 7.1.12 Yes Yes revised No C4-161426
C4-161255 Mc stage 3 to support SDP Capability Negotiation Huawei CR Agreement 7.1.12 Yes Yes revised No C4-161429
C4-161256 Discussion on the possible solution for GW selection Ericsson discussion 7.2.14 Yes Yes revised No C4-161292
C4-161257 Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP Ericsson CR 7.2.14 Yes Yes revised No C4-161291
C4-161258 DNS service for NB-IoT and Non-IP Ericsson CR 7.2.14 Yes No withdrawn Yes
C4-161259 Protocol change for Connection Suspend and Resume Procedure Ericsson CR 7.2.14 Yes Yes revised No C4-161408
C4-161260 Connection Resume procedure used during restoration Ericsson CR 7.2.14 Yes Yes revised No C4-161410
C4-161261 Protocol change for introducing new non-IP PDN type Ericsson CR 7.2.14 Yes Yes revised No C4-161404
C4-161262 ePDG selection with DNS-based Discovery of Regulatory Requirements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.3.5 Yes Yes revised No C4-161310
C4-161263 Data returned in IMSPublicIdentity correction, new EnhancedPublicIdentifiers class Ericsson CR 7.3.7 Yes Yes revised No C4-161344 C4-161089
C4-161264 New PDN-Type for Cellular IoT Ericsson CR 7.2.14 Yes Yes revised No C4-161313
C4-161265 New PDN-Type for Celullar IoT Ericsson CR 7.2.14 Yes Yes revised No C4-161314
C4-161266 New PDN-Type for Celular IoT Ericsson CR 7.2.14 Yes Yes revised No C4-161315
C4-161267 Reply LS on CT4 assumptions on AAA-1, MCPTT-2 and CSC-13 reference points 3GPP TSG CT WG1 LS in Discussion 7.2.11 Yes Yes noted No
C4-161268 LS Response on User Databases interfaces for MCPTT 3GPP TSG SA WG6 LS in Discussion 7.2.11 Yes Yes noted No
C4-161269 LS Response on CT4 assumptions on AAA-1, MCPTT-2 and CSC-13 reference points 3GPP TSG SA WG6 LS in Discussion 7.2.11 Yes Yes noted No
C4-161270 new Diameter application for MCPTT-2 and CSC-13 reference points ORANGE pCR Approval 7.2.11 Yes Yes revised No C4-161298
C4-161271 Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone CR Approval 7.2.10 Yes Yes agreed No C4-161154
C4-161272 WebRTC media plane optimization procedure Nokia Networks, Alcatel-Lucent CR Agreement 7.2.12 Yes Yes revised No C4-161368 C4-161185
C4-161273 Release of WebRTC Data Channels Alcatel-Lucent, Nokia Networks CR Approval 7.1.8 Yes Yes revised No C4-161328 C4-161007
C4-161274 WebRTC Data Channels Alcatel-Lucent, Nokia Networks CR Approval 7.1.8 Yes Yes revised No C4-161329 C4-161008
C4-161275 CT4 aspect of the Workplan CT4 Chairman Work Plan Approval 11 Yes Yes revised No C4-161547
C4-161276 Transferring AAA identifier to the PGW Ericsson, Orange CR 7.3.1 Yes Yes revised No C4-161353 C4-161168
C4-161277 AVP codes for 32.299 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes revised No C4-161441 C4-161177
C4-161278 Editorial clean-up ORANGE pCR Approval 7.1.19 Yes Yes approved No
C4-161279 Changes in the Command's CCF specifications ORANGE pCR Approval 7.1.19 Yes Yes revised No C4-161452
C4-161280 Proposed Conclusions ORANGE pCR Approval 7.1.19 Yes Yes postponed No
C4-161281 Proposed recommendations ORANGE pCR Approval 7.1.19 Yes Yes postponed No
C4-161282 Proposed text for the introduction of clause 5 ORANGE pCR Approval 7.1.19 Yes Yes revised No C4-161448
C4-161283 3GPP Work on ECN for Lower Layer Protocols: possible impact on H.248 gateways Alcatel-Lucent discussion Information 10.7 Yes Yes noted No
C4-161284 Protocol selection for T6a/b to support NIDD procedures Ericsson discussion Decision 7.2.14 Yes Yes noted No
C4-161285 Discussion on status of MONTE work Huawei discussion Discussion 7.1.9 Yes Yes noted No C4-161203
C4-161286 New AVP assignment for MONTE Huawei CR Decision 7.1.9 Yes Yes revised No C4-161425 C4-161085
C4-161287 Monitoring update and Reporting of update result Huawei, Orange, Telecom Italia CR Decision 7.2.7 Yes Yes revised No C4-161373 C4-161243
C4-161288 Pseudo-CR on cleanup of 29.128 Huawei pCR Decision 7.1.9 Yes Yes revised No C4-161347 C4-161076
C4-161289 Clarifications on Editor's notes on MONTE Huawei CR Decision 7.1.9 Yes Yes revised No C4-161430
C4-161290 Discussion on non IP data transfer over T6a Cisco Systems Inc discussion Decision 7.2.14 Yes Yes noted No C4-161207
C4-161291 Impacts on the DNS procedures for CIoT Ericsson CR 7.2.14 Yes Yes revised No C4-161395 C4-161257
C4-161292 Discussion on the possible solution for GW selection Ericsson discussion 7.2.14 Yes Yes noted No C4-161256
C4-161293 MCPTT data model Ericsson CR 7.2.11 Yes Yes revised No C4-161366 C4-161202
C4-161294 Subsciption for allowed services Huawei CR Decision 7.1.9 Yes Yes revised No C4-161431
C4-161295 Length Correction for tVPLMNID and tTimeZone Nokia Networks CR Agreement 7.3.7 Yes Yes revised No C4-161388
C4-161296 LS Response on MCPTT Group data and affiliation 3GPP TSG SA WG6 LS in Discussion 7.2.11 Yes Yes noted No
C4-161297 Future meeting calendar for information MCC other Information 13 Yes Yes noted No
C4-161298 new Diameter application for MCPTT-2 and CSC-13 reference points ORANGE, HP pCR Approval 7.2.11 Yes Yes revised No C4-161439 C4-161270
C4-161299 Reply to: TAC Allocation as detailed in 3GPP TS 23.003 current meeting LS out approval 4 Yes Yes revised No C4-161506
C4-161300 Clarification of TAC allocation Vodafone CR Agreement 4 Yes Yes revised No C4-161505
C4-161301 CT aspects of MTSI Extension on Multi-stream Multiparty Conferencing Media Handling Ericsson WID new Agreement 5 Yes Yes agreed No C4-161044
C4-161302 SCC AS Restoration China Mobile WID new - 5 Yes Yes agreed No C4-161055
C4-161303 MO Non-IP Data procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161483 C4-161233
C4-161304 MT Non-IP Data procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161484 C4-161234
C4-161305 Questions on non-IP data delivery procedures CT4 LS out discussion 7.2.14 Yes Yes revised No C4-161485
C4-161306 Connection management procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161487 C4-161235
C4-161307 Protocol for Non IP-Data over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks pCR Agreement 7.2.14 Yes Yes revised No C4-161488 C4-161236
C4-161308 New PDN-Type for Celular IoT Ericsson CR - 7.2.14 Yes Yes revised No C4-161490 C4-161232
C4-161309 Handover to Non-3GPP Access Not Allowed Ericsson, Orange CR - 7.3.5 Yes Yes agreed No C4-161138
C4-161310 ePDG selection with DNS-based Discovery of Regulatory Requirements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.3.5 Yes Yes agreed No C4-161262
C4-161311 LS on New subdomain name for ePDG selection with DNS-based discovery of regulatory requirements CT4 LS out Approval 7.3.5 Yes Yes revised No C4-161504
C4-161312 Authorize the UE requested APN Huawei CR - 7.3.3 Yes Yes agreed No C4-161099
C4-161313 New PDN-Type for Cellular IoT Ericsson CR - 7.2.14 Yes Yes revised No C4-161527 C4-161264
C4-161314 New PDN-Type for Celullar IoT Ericsson CR - 7.2.14 Yes Yes revised No C4-161528 C4-161265
C4-161315 New PDN-Type for Celular IoT Ericsson CR - 7.2.14 Yes Yes revised No C4-161529 C4-161266
C4-161316 User Plane Integrity Protection Indicator Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.10 Yes Yes agreed No C4-161071
C4-161317 User Plane Integrity Protection Indicator Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.10 Yes Yes agreed No C4-161072
C4-161318 User Plane Integrity Protection Indicator Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.10 Yes Yes agreed No C4-161073
C4-161319 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes revised No C4-161491 C4-161211
C4-161320 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes revised No C4-161492 C4-161210
C4-161321 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Vodafone, Deutsche Telekom, Huawei CR - 7.2.14 Yes Yes agreed No C4-161208
C4-161322 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes agreed No C4-161212
C4-161323 Allow SMS for NB-IoT UE without Combined Attach ZTE CR Approval 7.2.14 Yes Yes agreed No C4-161131
C4-161324 Authorisation for NIDD procedure over S6t Huawei, Vodafone CR Decision 7.2.14 Yes Yes revised No C4-161530 C4-161242
C4-161325 Definition of AVP configuration of NIDD Huawei CR Decision 7.2.14 Yes Yes revised No C4-161326 C4-161165
C4-161326 Definition of AVP configuration of NIDD Huawei CR Decision 7.2.14 Yes Yes agreed No C4-161325
C4-161327 Resolution of Editor’s notes on EVS over UMTS CS Qualcomm Incorporated CR Agreement 7.1.7 Yes Yes agreed No C4-161058
C4-161328 Release of WebRTC Data Channels Alcatel-Lucent, Nokia Networks CR Approval 7.1.8 Yes Yes agreed No C4-161273
C4-161329 WebRTC Data Channels Alcatel-Lucent, Nokia Networks CR Approval 7.1.8 Yes Yes agreed No C4-161274
C4-161330 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes revised No C4-161496 C4-161049
C4-161331 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes agreed No C4-161050
C4-161332 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes agreed No C4-161051
C4-161333 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes agreed No C4-161052
C4-161334 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes agreed No C4-161053
C4-161335 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes agreed No C4-161054
C4-161336 18 bits PDCP PDU Number Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR - 7.3.11 Yes Yes revised No C4-161498 C4-161182
C4-161337 Reply to: LS on extension to field length of PDCP Sequence Number current meeting LS out approval 7.3.11 Yes Yes revised No C4-161463
C4-161338 Delay Tolerant Connection Indication Ericsson, MCC CR - 7.2.10 Yes Yes agreed No C4-161172
C4-161339 Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure for GTPv1 Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone, Verizon, Nokia Networks CR - 7.2.10 Yes Yes agreed No C4-161173
C4-161340 Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone, Verizon, Nokia Networks CR - 7.2.10 Yes Yes agreed No C4-161174
C4-161341 ePDG retrieval of WLAN Location Information Alcatel-Lucent CR Approval 7.2.9 Yes Yes agreed No C4-161157
C4-161342 Incorrect use of the term "full hexadecimal representation" to mean binary encoding Oracle Corporation CR Approval 7.3.1 Yes Yes agreed No C4-161134
C4-161343 Incorrect use of the term "full hexadecimal representation" to mean binary encoding Oracle Corporation CR Approval 7.3.1 Yes Yes agreed No C4-161135
C4-161344 Data returned in IMSPublicIdentity correction, new EnhancedPublicIdentifiers class Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Hewlett Packard Enterprise CR 7.3.7 Yes Yes agreed No C4-161263
C4-161345 Pseudo-CR on Removing Editor's Note on IWK-SCEF Authorization and Configuration Failure at IWK-SCEF Cisco Systems Inc pCR Approval 7.1.9 Yes Yes revised No C4-161462 C4-161060
C4-161346 Notifying the status of MONTE event configuration at the IWK-SCEF to the HSS Cisco Systems Inc CR Approval 7.1.9 Yes Yes revised No C4-161465 C4-161061
C4-161347 Pseudo-CR on cleanup of 29.128 Huawei pCR Decision 7.1.9 Yes Yes revised No C4-161467 C4-161288
C4-161348 AVAILABILITY_AFTER_DDN_FAILURE reporting Huawei CR Decision 7.1.9 Yes Yes revised No C4-161468 C4-161077
C4-161349 Protocol Type in Create Session Request Huawei CR Agreement 7.3.1 Yes Yes agreed No C4-161122
C4-161350 Clarification on usage of P and T needs Huawei Tech.(UK) Co., Ltd CR Decision 7.1.9 Yes Yes agreed No C4-161079
C4-161351 GTP-C Load Control - Mix of NAPTR records with "s" and "a" flags Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.3.1 Yes Yes agreed No C4-161160
C4-161352 Pseudo-CR on overload Huawei Tech.(UK) Co., Ltd pCR Decision 7.1.9 Yes Yes approved No C4-161080
C4-161353 Transferring AAA identifier to the PGW Ericsson, Orange, Telia Sonera CR - 7.3.1 Yes Yes revised No C4-161459 C4-161276
C4-161354 HSS restart MONTE impacts Huawei Tech.(UK) Co., Ltd CR Decision 7.1.9 Yes Yes revised No C4-161470 C4-161081
C4-161355 Comprehension requirement for PDCP PDU Number Ericsson CR - 7.3.1 Yes Yes revised No C4-161461 C4-161171
C4-161356 Add cause values to TWAN mapping table Huawei CR - 8.3.1 Yes Yes revised No C4-161464 C4-161096
C4-161357 Add cause values to TWAN mapping table Huawei CR - 8.3.1 Yes Yes agreed No C4-161097
C4-161358 Restart of SCEF Huawei Tech.(UK) Co., Ltd CR Decision 7.1.9 Yes Yes revised No C4-161472 C4-161082
C4-161359 Reporting of the start and stop of the reporting of monitoring events Huawei Tech.(UK) Co., Ltd CR Decision 7.1.9 Yes Yes revised No C4-161508 C4-161084
C4-161360 Fix the issue on HSS restart procedure NEC EUROPE LTD CR Approval 7.3.4 Yes Yes agreed No C4-161070
C4-161361 Correct the partial failure handling on SGW Huawei CR Agreement 7.3.4 Yes Yes agreed No C4-161123
C4-161362 Introduction of AAA-1 interface Huawei CR Decision 7.2.11 Yes Yes revised No C4-161502 C4-161244
C4-161363 DNS procedures for Decor DOCOMO Communications Lab. CR Agreement 7.1.18 Yes Yes revised No C4-161365 C4-161176
C4-161364 Clarification on the use of UE Usage Type Ericsson, NTT DOCOMO CR - 7.1.18 Yes Yes agreed No C4-161169
C4-161365 DNS procedures for Decor DOCOMO Communications Lab. CR Agreement 7.1.18 Yes Yes revised No C4-161482 C4-161363
C4-161366 MCPTT data model Ericsson CR 7.2.11 No Yes withdrawn Yes C4-161293
C4-161367 PDN Connection Charging ID for NBIFOM CT4 LS out Decision 7.2.6 Yes Yes revised No C4-161466
C4-161368 WebRTC media plane optimization procedure Nokia Networks, Alcatel-Lucent CR Agreement 7.2.12 Yes Yes agreed No C4-161272
C4-161369 WebRTC gateway configuration for end-to-end WebRTC calls (stage 3) Alcatel-Lucent CR Approval 7.2.12 Yes Yes agreed No C4-161010
C4-161370 TrGW configuration for end-to-end WebRTC calls (stage 3) Alcatel-Lucent CR Approval 7.2.12 Yes Yes agreed No C4-161011
C4-161371 Removal of references to TS 26.235 Ericsson CR - 7.3.9 Yes Yes agreed No C4-161045
C4-161372 Removal of references to TS 26.236 Ericsson CR - 7.3.9 Yes Yes agreed No C4-161047
C4-161373 Monitoring update and Reporting of update result Huawei, Orange, Telecom Italia CR Decision 7.2.7 Yes Yes agreed No C4-161287
C4-161374 Addition of ProSe Application Code Prefix and ProSe Application Code Suffix formats QUALCOMM Incorporated CR Agreement 7.2.7 Yes Yes agreed No C4-161057
C4-161375 Inter-PLMN discovery transmission support Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes agreed No C4-161117
C4-161376 Adding security related parameters for restricted ProSe direct discovery authorization Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes agreed No C4-161118
C4-161377 Support open discovery with application-controlled extension Qualcomm Incorporated CR Agreement 7.2.7 Yes Yes agreed No C4-161119
C4-161378 S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Verizon, AT&T, Orange, China Mobile CR Approval 7.2.14 Yes Yes revised No C4-161469 C4-161145
C4-161379 S11-U tunneling for MO/MT data transport in control plane (SGi based) Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes agreed No C4-161147
C4-161380 Monitoring update and Reporting of update result Huawei CR Decision 7.2.7 Yes Yes agreed No C4-161246
C4-161381 End Marker handling by MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes agreed No C4-161148
C4-161382 Allocation of new Diameter Application ID and commands code for PC2 protocol Huawei CR Decision 7.2.7 Yes Yes revised No C4-161536 C4-161248
C4-161383 S11-U Error Indication handling Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes agreed No C4-161384 C4-161149
C4-161384 S11-U Error Indication handling Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 No Yes withdrawn Yes C4-161149
C4-161385 Cleanup of the editor's notes for reporting remote UE Ericsson CR 7.2.7 Yes Yes revised No C4-161507 C4-161170
C4-161386 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes not pursued No C4-161104
C4-161387 Local Time Zone for CS retrieval Ericsson CR 7.3.7 Yes Yes agreed No C4-161091
C4-161388 Length Correction for tVPLMNID and tTimeZone Nokia Solutions & Networks (S) CR Agreement 7.3.7 Yes Yes agreed No C4-161295
C4-161389 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161109
C4-161390 Encoding of IP-SM-GW Number Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161110
C4-161391 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161115
C4-161392 IP-SW-GW number format Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161116
C4-161393 Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP Ericsson LM LS out Decision 7.2.14 Yes Yes revised No C4-161471
C4-161394 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161124
C4-161395 Impacts on the DNS procedures for CIoT Ericsson CR - 7.2.14 Yes Yes revised No C4-161473 C4-161291
C4-161396 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161125
C4-161397 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161126
C4-161398 Encoding of SC Address Hewlett-Packard Enterprise CR Agreement 10.18 Yes Yes agreed No C4-161127
C4-161399 RAT-Type extension for NB-IoT Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks CR Approval 7.2.14 Yes Yes agreed No C4-161146
C4-161400 P-CSCF restoration not prioritized for WLAN Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.1.3 Yes Yes agreed No C4-161179
C4-161401 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161480 C4-161206
C4-161402 Result-Codes for P-CSCF Restoration Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Bell CR 7.1.3 Yes Yes agreed No C4-161180
C4-161403 Storage for CIoT control plane optimization related information at MME Cisco Systems Inc CR Approval 7.2.14 Yes Yes agreed No C4-161239
C4-161404 Protocol change for introducing new non-IP PDN type Ericsson CR - 7.2.14 Yes Yes revised No C4-161476 C4-161261
C4-161405 Result-Codes for P-CSCF Restoration Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.1.3 Yes Yes agreed No C4-161204
C4-161406 Diameter message priority over S6m, S6n, S6t Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes agreed No C4-161191
C4-161407 Diameter message priority over S6c, SGd, GddDiameter message priority over S6c, SGd, Gdd Alcatel-Lucent CR Agreement 7.1.20 Yes Yes agreed No C4-161192
C4-161408 Diameter message priority over T4 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 No Yes revised No C4-161409 C4-161194
C4-161409 Diameter message priority over T4 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes agreed No C4-161194
C4-161410 Connection Resume procedure used during restoration Ericsson CR - 7.2.14 Yes Yes revised No C4-161477 C4-161260
C4-161411 Diameter message priority over S7a/d, S13, S13’ Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes agreed No C4-161195
C4-161412 Diameter message priority over PC4a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes agreed No C4-161196
C4-161413 Diameter message priority over PC6/PC7 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC CR Agreement 7.1.20 Yes Yes agreed No C4-161197
C4-161414 Diameter message priority over T6a, T6ai, T6b, T6bi, T7 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC pCR Agreement 7.1.20 Yes Yes approved No C4-161199
C4-161415 Protocol change for Connection Suspend and Resume Procedure Ericsson CR - 7.2.14 Yes Yes agreed No C4-161259
C4-161416 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks, Alcatel Lucent CR Agreement 8.1.19 Yes Yes agreed No C4-161188
C4-161417 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks CR Agreement 8.1.19 Yes Yes agreed No C4-161189
C4-161418 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks, Alcatel Lucent CR Agreement 8.1.19 Yes Yes agreed No C4-161198
C4-161419 Configure Monitoring Event to Multiple Serving Nodes ZTE CR Approval 7.1.9 Yes Yes revised No C4-161510 C4-161128
C4-161420 Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling Nokia Networks, Alcatel Lucent CR - 8.1.19 Yes Yes agreed No C4-161200
C4-161421 Iq stage 3 to support SDP Capability Negotiation Huawei CR - 7.1.12 Yes Yes revised No C4-161494 C4-161251
C4-161422 Ix stage 3 to support SDP Capability Negotiation Huawei CR Agreement 7.1.12 Yes Yes agreed No C4-161252
C4-161423 Count and Stop Monitoring Event Reports at SCEF ZTE CR Approval 7.1.9 Yes Yes agreed No C4-161130
C4-161424 Mp stage 3 to support SDP Capability Negotiation Huawei CR - 7.1.12 Yes Yes revised No C4-161495 C4-161253
C4-161425 New AVP assignment for MONTE Huawei CR Decision 7.1.9 Yes Yes revised No C4-161509 C4-161286
C4-161426 Mn stage 3 to support SDP Capability Negotiation Huawei CR - 7.1.12 Yes Yes agreed No C4-161427 C4-161254
C4-161427 Mn stage 3 to support SDP Capability Negotiation Huawei CR 7.1.12 No Yes withdrawn Yes C4-161426
C4-161428 Change of type of Monitoring-Duration AVP to represent an absolute time Ericsson CR 7.1.9 Yes Yes agreed No C4-161140
C4-161429 Mc stage 3 to support SDP Capability Negotiation Huawei CR Agreement 7.1.12 Yes Yes agreed No C4-161255
C4-161430 Definition of Monitoring-Type and clarifications on UE in MME and SGSN for MONTE Huawei CR Decision 7.1.9 Yes Yes revised No C4-161497 C4-161289
C4-161431 Subsciption for allowed services Huawei CR Decision 7.1.9 Yes Yes revised No C4-161501 C4-161294
C4-161432 No Delete Session Request for non-existing PDN connection Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.2.14 Yes Yes agreed No C4-161213
C4-161433 Data model for new Application FEs’ data clarification Ericsson CR 7.2.11 No Yes revised Yes C4-161457 C4-161240
C4-161434 No Create Session Request for Attach without PDN connection Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.2.14 Yes Yes agreed No C4-161214
C4-161435 No Paging and Serving Information in a DDN for a non-IP PDN connections Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161478 C4-161215
C4-161436 Behaviours upon receipt of unknown NIDD Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161533 C4-161216
C4-161437 Enhance restoration procedure to be compatible with PDN connection to the SCEF Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161438 C4-161218
C4-161438 Enhance restoration procedure to be compatible with PDN connection to the SCEF Huawei CR Agreement 7.2.14 Yes Yes revised Yes C4-161481 C4-161437
C4-161439 new Diameter application for MCPTT-2 and CSC-13 reference points ORANGE, HPE, Motorola pCR Approval 7.2.11 Yes Yes revised No C4-161515 C4-161298
C4-161440 AVP Codes for 29.12 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 8.3.7 Yes Yes agreed No C4-161245
C4-161441 AVP codes for 32.299 Nokia Networks, Alcatel-Lucent, MCC, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes agreed No C4-161277
C4-161442 AVP code range reservation for 32.299 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 8.3.7 Yes Yes agreed No C4-161178
C4-161443 Addition of AVP code definitions CT4 LS out Information 7.3.2 Yes Yes approved No
C4-161444 Corrections on TS numbers Huawei CR Decision 7.3.2 Yes Yes agreed No C4-161087
C4-161445 Codes for 29.212 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.2 Yes Yes agreed No C4-161247
C4-161446 Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pCR Agreement 7.1.19 Yes Yes revised No C4-161453
C4-161447 Invocation of Alert procedure by HSS after ULR Ericsson CR 7.3.6 Yes Yes agreed No C4-161137
C4-161448 Proposed text for the introduction of clause 5 ORANGE pCR Approval 7.1.19 Yes Yes approved No C4-161282
C4-161449 Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration ZTE CR Agreement 9.8 Yes Yes agreed No C4-161065
C4-161450 Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration ZTE CR Agreement 9.8 Yes Yes agreed No C4-161066
C4-161451 Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration ZTE CR Agreement 9.8 Yes Yes agreed No C4-161067
C4-161452 Changes in the Command's CCF specifications ORANGE pCR Approval 7.1.19 Yes Yes approved No 12791 C4-161279
C4-161453 Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pCR Agreement 7.1.19 Yes Yes approved No C4-161446
C4-161454 SCEF Restart Huawei CR Decision 7.1.9 Yes Yes revised No C4-161474 C4-161083
C4-161455 Pseudo-CR on SCEF restart Huawei pCR Decision 7.1.9 Yes Yes revised No C4-161475
C4-161456 Reply LS to CT4 LS on progress of the work on Diameter Base Protocol Update ORANGE LS out Decision 7.1.19 Yes Yes revised No C4-161541
C4-161457 MCPTT Application FEs Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.2.11 Yes Yes revised No C4-161489 C4-161433
C4-161458 CT aspects for Non-IP for Cellular Internet of Things for 2G/3G-GPRS Orange, Ericsson other Endorsement 5 Yes Yes revised No C4-161503
C4-161459 Transferring AAA identifier to the PGW Ericsson, Orange, Telia Sonera CR - 7.3.1 Yes Yes agreed No C4-161353
C4-161460 Reply LS on clarification on requirements for MONTE Huawei LS out 7.1.9 Yes Yes revised No C4-161537
C4-161461 Comprehension requirement for PDCP PDU Number Ericsson CR - 7.3.1 Yes Yes agreed No C4-161355
C4-161462 Pseudo-CR on Removing Editor's Note on IWK-SCEF Authorization and Configuration Failure at IWK-SCEF Cisco Systems Inc pCR Approval 7.1.9 Yes Yes approved No C4-161345
C4-161463 Reply to: LS on extension to field length of PDCP Sequence Number current meeting LS out approval 7.3.11 Yes Yes revised No C4-161500 C4-161337
C4-161464 Add cause values to TWAN mapping table Huawei CR - 8.3.1 Yes Yes agreed No C4-161356
C4-161465 Notifying the status of MONTE event configuration at the IWK-SCEF to the HSS Cisco Systems Inc CR Approval 7.1.9 Yes Yes agreed No C4-161346
C4-161466 PDN Connection Charging ID for NBIFOM CT4 LS out Decision 7.2.6 Yes Yes approved No C4-161367
C4-161467 Pseudo-CR on cleanup of 29.128 Huawei pCR Decision 7.1.9 Yes Yes approved No C4-161347
C4-161468 AVAILABILITY_AFTER_DDN_FAILURE reporting Huawei CR Decision 7.1.9 Yes Yes agreed No C4-161348
C4-161469 S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Verizon, AT&T, Orange, China Mobile CR Approval 7.2.14 Yes Yes revised No C4-161531 C4-161378
C4-161470 HSS restart MONTE impacts Huawei CR Decision 7.1.9 Yes Yes agreed No C4-161513 C4-161354
C4-161471 Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP Ericsson LM LS out Decision 7.2.14 Yes Yes revised No C4-161519 C4-161393
C4-161472 Restart of SCEF Huawei CR Decision 7.1.9 Yes Yes agreed No 10822 C4-161358
C4-161473 Impacts on the DNS procedures for CIoT Ericsson CR - 7.2.14 Yes Yes agreed No C4-161395
C4-161474 SCEF Restart Huawei CR Decision 7.1.9 Yes Yes agreed No C4-161454
C4-161475 Pseudo-CR on SCEF restart Huawei pCR Decision 7.1.9 Yes Yes agreed No C4-161455
C4-161476 Protocol change for introducing new non-IP PDN type Ericsson CR - 7.2.14 Yes Yes agreed No C4-161404
C4-161477 Connection Resume procedure used during restoration Ericsson CR - 7.2.14 Yes Yes agreed No C4-161410
C4-161478 No Paging and Serving Information in a DDN for a non-IP PDN connections Huawei CR Agreement 7.2.14 Yes Yes agreed No C4-161435
C4-161479 Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Orange, Motorola discussion Decision 7.2.11 Yes Yes noted No C4-161514 C4-161238
C4-161480 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161525 C4-161401
C4-161481 Enhance restoration procedure to be compatible with PDN connection to the SCEF Huawei CR Agreement 7.2.14 Yes Yes agreed Yes C4-161438
C4-161482 DNS procedures for Decor NTT DOCOMO CR Agreement 7.1.18 Yes Yes revised No C4-161513 C4-161365
C4-161483 MO Non-IP Data procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes agreed No C4-161303
C4-161484 MT Non-IP Data procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes agreed No C4-161304
C4-161485 Questions on non-IP data delivery procedures CT4 LS out discussion 7.2.14 Yes Yes revised No C4-161535 C4-161305
C4-161486 Iq stage 2 for SDP Media Capabilities Negotiation Huawei CR Agreement 7.1.12 Yes No withdrawn Yes
C4-161487 Connection management procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes revised No C4-161518 C4-161306
C4-161488 Protocol for Non IP-Data over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes revised No C4-161534 C4-161307
C4-161489 MCPTT Application FEs Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.2.11 Yes Yes agreed No C4-161457
C4-161490 New PDN-Type for Cellular IoT Ericsson CR - 7.2.14 Yes Yes revised No C4-161526 C4-161308
C4-161491 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes agreed No C4-161319
C4-161492 Addition of NB-IoT radio access type to the Access-Restriction-Data feature Vodafone GmbH, Deutsche Telekom, Huawei CR Approval 7.2.14 Yes Yes agreed No C4-161320
C4-161493 Subscription data for combined MME/SGSN Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.3.6 Yes Yes postponed No C4-161175
C4-161494 Iq stage 3 to support SDP Capability Negotiation Huawei CR - 7.1.12 Yes Yes agreed No C4-161421
C4-161495 Mp stage 3 to support SDP Capability Negotiation Huawei CR - 7.1.12 Yes Yes agreed No C4-161424
C4-161496 Support of enhanced bandwidth negotiation mechanism for MTSI sessions Ericsson CR - 7.2.3 Yes Yes agreed No C4-161330
C4-161497 Definition of Monitoring-Type and clarifications on UE in MME and SGSN for MONTE Huawei CR Decision 7.1.9 Yes Yes revised No C4-161511 C4-161430
C4-161498 18 bits PDCP PDU Number Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR - 7.3.11 Yes Yes agreed No C4-161499 C4-161336
C4-161499 18 bits PDCP PDU Number Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR 7.3.11 No Yes withdrawn Yes C4-161498
C4-161500 Reply to: LS on extension to field length of PDCP Sequence Number CT4 LS out approval 7.3.11 Yes Yes approved No C4-161463
C4-161501 Subsciption for allowed services Huawei CR Decision 7.1.9 Yes Yes agreed No C4-161431
C4-161502 Introduction of AAA-1 interface Huawei CR Decision 7.2.11 Yes Yes revised No C4-161517 C4-161362
C4-161503 CT aspects for Non-IP for Cellular Internet of Things for 2G/3G-GPRS Orange, Ericsson other Endorsement 5 Yes Yes endorsed No C4-161458
C4-161504 LS on New subdomain name for ePDG selection with DNS-based discovery of regulatory requirements CT4 LS out Approval 7.3.5 Yes Yes approved No C4-161311
C4-161505 Clarification of TAC allocation Vodafone CR Agreement 4 Yes Yes agreed No C4-161300
C4-161506 Reply to: TAC Allocation as detailed in 3GPP TS 23.003 current meeting LS out approval 4 Yes Yes approved No C4-161299
C4-161507 Cleanup of the editor's notes for reporting remote UE Ericsson CR - 7.2.7 Yes Yes agreed No C4-161385
C4-161508 Reporting of the start and stop of the reporting of monitoring events Huawei Tech.(UK) Co., Ltd CR Decision 7.1.9 Yes Yes agreed No C4-161359
C4-161509 New AVP assignment for MONTE Huawei CR Decision 7.1.9 Yes Yes agreed No C4-161425
C4-161510 Configure Monitoring Event to Multiple Serving Nodes ZTE CR Approval 7.1.9 Yes Yes revised No C4-161540 C4-161419
C4-161511 Definition of Monitoring-Type and clarifications on UE in MME and SGSN for MONTE Huawei CR Decision 7.1.9 Yes Yes agreed No C4-161497
C4-161512 draft 29.128 rapporteur draft TS Agreement 7.1.9 No Yes not concluded No
C4-161513 DNS procedures for Decor NTT DOCOMO, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Agreement 7.1.18 Yes Yes agreed No C4-161482
C4-161514 Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Orange, Motorola pCR Decision 7.2.11 Yes Yes revised Yes C4-161538 C4-161479
C4-161515 new Diameter application for MCPTT-2 and CSC-13 reference points ORANGE, HPE, Motorola draft TS Approval 7.2.11 Yes Yes revised No C4-161516 C4-161439
C4-161516 new Diameter application for MCPTT-2 and CSC-13 reference points ORANGE, HPE, Motorola draft TS Approval 7.2.11 No No reserved No C4-161515
C4-161517 Introduction of AAA-1 interface Huawei, Ericsson CR Decision 7.2.11 Yes Yes agreed No C4-161502
C4-161518 Connection management procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes revised No C4-161544 C4-161487
C4-161519 Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP Ericsson LM LS out Decision 7.2.14 Yes Yes approved No C4-161471
C4-161520 LS on New AVPs and Experimental Result Code in TS 29.214 CT3 LS in Action 7.3.2 Yes Yes noted No
C4-161521 LS on Allocation of new Diameter Application ID and commands code for PC2 protocol CT3 LS in Action 7.2.7 Yes Yes noted No
C4-161522 LS on Request for Diameter Command Code for new St Interface CT3 LS in Action 4 Yes Yes postponed No
C4-161523 LS on new AVPs in TS 29.212 CT3 LS in Action 4 Yes Yes noted No
C4-161524 LS on EVS over CS (S4-160310/ C3-160189) CT3 LS in Action 4 Yes Yes postponed No
C4-161525 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161532 C4-161480
C4-161526 New PDN-Type for Cellular IoT Ericsson CR - 7.2.14 Yes Yes agreed No C4-161490
C4-161527 New PDN-Type for Cellular IoT Ericsson CR - 7.2.14 Yes Yes agreed No C4-161313
C4-161528 New PDN-Type for Celullar IoT Ericsson CR - 7.2.14 Yes Yes agreed No C4-161314
C4-161529 New PDN-Type for Celular IoT Ericsson CR - 7.2.14 Yes Yes agreed No C4-161315
C4-161530 Authorisation for NIDD procedure over S6t Huawei, Vodafone CR Decision 7.2.14 Yes Yes agreed No C4-161324
C4-161531 S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Verizon, AT&T, Orange, China Mobile, Deutsche Telekom, Huawei. CR Approval 7.2.14 Yes Yes agreed No C4-161469
C4-161532 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161539 C4-161525
C4-161533 Behaviours upon receipt of unknown NIDD Huawei CR Agreement 7.2.14 Yes Yes revised No C4-161546 C4-161436
C4-161534 Protocol for Non IP-Data over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes approved No C4-161488
C4-161535 Questions on non-IP data delivery procedures CT4 LS out discussion 7.2.14 Yes Yes approved No C4-161485
C4-161536 Allocation of new Diameter Application ID and commands code for PC2 protocol Huawei CR Decision 7.2.7 Yes Yes revised No C4-161543 C4-161382
C4-161537 Reply LS on clarification on requirements for MONTE Huawei LS out - 7.1.9 Yes Yes approved No C4-161460
C4-161538 Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Orange, Motorola pCR Decision 7.2.11 Yes Yes withdrawn Yes C4-161514
C4-161539 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes revised No C4-161545 C4-161532
C4-161540 Configure Monitoring Event to Multiple Serving Nodes ZTE CR Approval 7.1.9 Yes Yes agreed No C4-161510
C4-161541 Reply LS to CT4 LS on progress of the work on Diameter Base Protocol Update ORANGE LS out Decision 7.1.19 Yes Yes agreed No C4-161456
C4-161542 draft TR 29.819 Lionel Monrad other Information 7.1.19 No Yes not concluded No
C4-161543 Allocation of new Diameter Application ID and commands code for PC2 protocol Huawei CR Decision 7.2.7 Yes Yes agreed No C4-161536
C4-161544 Connection management procedures over T6a Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc pCR Agreement 7.2.14 Yes Yes approved No C4-161518
C4-161545 Transfer of non IP PDN to peer MME during mobility Cisco Systems Inc CR Approval 7.2.14 Yes Yes agreed No C4-161539
C4-161546 Behaviours upon receipt of unknown NIDD Huawei CR Agreement 7.2.14 Yes Yes agreed No C4-161533
C4-161547 CT4 aspect of the Workplan CT4 Chairman Work Plan Approval 11 Yes Yes approved No C4-161275
C4-161548 List of output documents Chairman other Information 14 Yes No available No