3GPP TDocs (written contributions) at meeting
Meeting: R1-92 - 2018-02-26 to 2018-03-02, Athens
meeting id: R1-92 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑180130 | - | - | - |
R1‑1801300 | Draft Agenda of RAN1#92 meeting | RAN1 Chair | imported from 3GU |
R1‑1801301 | Report of RAN1#91 meeting | ETSI | imported from 3GU |
R1‑1801302 | Report of RAN1#AH_1801 meeting | ETSI | imported from 3GU |
R1‑1801303 | Highlights from RAN#78 | RAN1 Chair | imported from 3GU |
R1‑1801304 | LS about LTE CA SCell New State agreements | RAN2, Qualcomm | imported from 3GU |
R1‑1801305 | Reply LS on Issue with handovers in eMTC | RAN2, Qualcomm | imported from 3GU |
R1‑1801306 | Reply LS to RAN1 on wake-up signal | RAN2, Huawei | imported from 3GU |
R1‑1801307 | Reply LS on System acquisition time reduction for Rel-15 LTE MTC | RAN2, Huawei | imported from 3GU |
R1‑1801308 | LS on LTE Control Plane Latency Reduction | RAN2, Vodafone | imported from 3GU |
R1‑1801309 | LS response to System acquisition time reduction for Rel-15 LTE MTC | RAN4, Ericsson | imported from 3GU |
R1‑180131 | - | - | - |
R1‑1801310 | LS reply on transmit diversity impact on V2X PC5 | RAN4, Intel Corporation | imported from 3GU |
R1‑1801311 | LS reply on resource selection for Mode-4 sidelink CA | RAN4, Huawei | imported from 3GU |
R1‑1801312 | LS on SAE C-V2X TC Views on eV2X evaluation methodology | SAE C-V2X, Qualcomm | imported from 3GU |
R1‑1801313 | LS on Control Plane latency reduction | RAN, Ericsson | imported from 3GU |
R1‑1801314 | Reply to WFA_LS_171121 = RP-172167 on RAN4 Coexistence tests for LTE-LAA | RAN, Nokia | imported from 3GU |
R1‑1801315 | LS on transmission timing adjustments in Stti | RAN4, Huawei | imported from 3GU |
R1‑1801316 | LS to RAN1 on MAC CE for MIMO | RAN2, Nokia | imported from 3GU |
R1‑1801317 | LS on PHR | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1801318 | LS on Clarifications in MAC | RAN2, Ericsson | imported from 3GU |
R1‑1801319 | Reply LS to RAN1 on PRACH with ON-OFF time mask | RAN4, Ericsson | imported from 3GU |
R1‑180132 | - | - | - |
R1‑1801320 | LS to RAN1 on beam failure recovery | RAN2, CATT | imported from 3GU |
R1‑1801321 | LS on supporting power sharing | RAN2, Huawei | imported from 3GU |
R1‑1801322 | LS on NR Idle Mode Measurements | RAN2, Qualcomm | imported from 3GU |
R1‑1801323 | LS to RAN1 on RRC Configuration for Sync Raster and Channel Raster | RAN2, MediaTek | imported from 3GU |
R1‑1801324 | Reply LS on formula or table for L1 data rate | RAN2, NTT DOCOMO | imported from 3GU |
R1‑1801325 | LS on measurement gap patterns | RAN4, Huawei | imported from 3GU |
R1‑1801326 | LS reply on required information for NSA on X2 | RAN4, Nokia | imported from 3GU |
R1‑1801327 | Remaining details on synchronization signal | Huawei, HiSilicon | imported from 3GU |
R1‑1801328 | Remaining details of NR PBCH design | Huawei, HiSilicon | imported from 3GU |
R1‑1801329 | Remaining on RMSI configurations | Huawei, HiSilicon | imported from 3GU |
R1‑180133 | - | - | - |
R1‑1801330 | Remaining details of RACH Preambles | Huawei, HiSilicon | imported from 3GU |
R1‑1801331 | Remaining details of RACH Procedures | Huawei, HiSilicon | imported from 3GU |
R1‑1801332 | Remaining details on NR RRM | Huawei, HiSilicon | imported from 3GU |
R1‑1801333 | Remaining details on NR RLM | Huawei, HiSilicon | imported from 3GU |
R1‑1801334 | Remaining issues on PDCCH structure | Huawei, HiSilicon | imported from 3GU |
R1‑1801335 | Remaining issues on search space | Huawei, HiSilicon | imported from 3GU |
R1‑1801336 | Remaining issues on group-common PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1801337 | Remaining issues on DCI contents and formats | Huawei, HiSilicon | imported from 3GU |
R1‑1801338 | Summary of remaining issues on PDCCH monitoring with TP | Huawei, HiSilicon | imported from 3GU |
R1‑1801339 | Remaining issues on PUCCH structure in short-duration | Huawei, HiSilicon | imported from 3GU |
R1‑180134 | - | - | - |
R1‑1801340 | Remaining issues on PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1801341 | Remaining issues on UCI multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1801342 | Remaining issues on resource allocation for PUCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1801343 | Remaining issues on resource allocation and TBS | Huawei, HiSilicon | imported from 3GU |
R1‑1801344 | Remaining issues on CBG-based (re)transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1801345 | Remaining issues on soft buffer management | Huawei, HiSilicon | imported from 3GU |
R1‑1801346 | Summary of remaining issues on pre-emption indication with TP | Huawei, HiSilicon | imported from 3GU |
R1‑1801347 | Summary of remaining issues on bandwidth part and wideband operation | Huawei, HiSilicon | imported from 3GU |
R1‑1801348 | Summary of remaining issues on NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1801349 | Remaining issues on reserved resources and rate-matching | Huawei, HiSilicon | imported from 3GU |
R1‑180135 | - | - | - |
R1‑1801350 | Discussion on remaining issues for SUL and EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑1801351 | Views on UE feature list | Huawei, HiSilicon | imported from 3GU |
R1‑1801352 | Discussion on NR UE peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1801353 | Draft reply LS on NR UE peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1801354 | MCS/CQI design for URLLC transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1801355 | Compact DCI design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801356 | UL multiplexing between URLLC and eMBB | Huawei, HiSilicon | imported from 3GU |
R1‑1801357 | UCI piggyback on PUSCH for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801358 | PUCCH reliability | Huawei, HiSilicon | imported from 3GU |
R1‑1801359 | PDSCH reliability for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180136 | - | - | - |
R1‑1801360 | NTN Channel Modeling | Huawei, HiSilicon | imported from 3GU |
R1‑1801361 | Discussion on Tx side NoMA design and initial comparison results | Huawei, HiSilicon | imported from 3GU |
R1‑1801362 | Discussion on receivers for NoMA | Huawei, HiSilicon | imported from 3GU |
R1‑1801363 | Discussion on DMRS design for NoMA with large number of users | Huawei, HiSilicon | imported from 3GU |
R1‑1801364 | Discussion on LLS parameters and methodology for NoMA evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑1801365 | On eV2X Evaluation Methodology | Huawei, HiSilicon | imported from 3GU |
R1‑1801366 | V2X sidelink channel model: LOS probability curves and NLOS state due to vehicle blockage | Huawei, HiSilicon | imported from 3GU |
R1‑1801367 | Simulation scenarios of NR Unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1801368 | NR licensed assisted and standalone operation on unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1801369 | Candidate spectrum for NR unlicensed band operation | Huawei, HiSilicon | imported from 3GU |
R1‑180137 | - | - | - |
R1‑1801370 | NR Frame structure on unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1801371 | Coexistence and Channel access for NR unlicensed band operations | Huawei, HiSilicon | imported from 3GU |
R1‑1801372 | Remaining details for UL partial subframe transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1801373 | Remaining details for AUL resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1801374 | Remaining details for AUL HARQ operation | Huawei, HiSilicon | imported from 3GU |
R1‑1801375 | Remaining details on AUL channel access | Huawei, HiSilicon | imported from 3GU |
R1‑1801376 | Clarification on valid NDI of UL CWS adjustment for eLAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1801377 | Remaining issues on 1024QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1801378 | Views on LTE Control Plane Latency Reduction | Huawei, HiSilicon | imported from 3GU |
R1‑1801379 | Text proposal on transmission timing adjustments in sTTI and and sPT | Huawei, HiSilicon | imported from 3GU |
R1‑180138 | - | - | - |
R1‑1801380 | Discussion and text proposal on TBS determination | Huawei, HiSilicon | imported from 3GU |
R1‑1801381 | Discussion and text proposal on MIMO-related fields in sDCI format | Huawei, HiSilicon | imported from 3GU |
R1‑1801382 | Discussion and text proposal DCI/sDCI alignment in sTTI 0 | Huawei, HiSilicon | imported from 3GU |
R1‑1801383 | Handling of collision between PRACH and sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1801384 | Discussion and text proposal on a-CSI reporting | Huawei, HiSilicon | imported from 3GU |
R1‑1801385 | Summary of email discussion on the link level evaluation for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801386 | Overview of candidate techniques for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801387 | PUSCH design for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801388 | PUCCH design for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801389 | PDCCH design for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180139 | - | - | - |
R1‑1801390 | LTE URLLC and eMBB multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1801391 | Discussion on modulation enhancement for 256QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1801392 | Introducing of LTE UE DL CAT 21 for 1.4Gbps in Rel.14 | Huawei, HiSilicon | imported from 3GU |
R1‑1801393 | Draft LS on introducing of LTE UE DL CAT 21 for 1.4Gbps in Rel.14 | Huawei, HiSilicon | imported from 3GU |
R1‑1801394 | Subslot-SPUCCH resource for formats 1a and 1b | Huawei, HiSilicon | imported from 3GU |
R1‑1801395 | Aspects related to DL control channel | Huawei, HiSilicon | imported from 3GU |
R1‑1801396 | LS reply on Baseband Processing Capabilities | Huawei, HiSilicon | imported from 3GU |
R1‑1801397 | Discussion on application scenarios for NoMA | Huawei, HiSilicon | imported from 3GU |
R1‑1801398 | V2X sidelink measurement results | Huawei, HiSilicon | imported from 3GU |
R1‑1801399 | Consideration on detailed work plan for self evaluation against IMT-2020 requirements | Huawei, HiSilicon | imported from 3GU |
R1‑180140 | - | - | - |
R1‑1801400 | Consideration on evaluation features and parameters for IMT-2020 self evaluation on eMBB spectral efficiency and data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1801401 | Discussion on mMTC calibration for IMT-2020 self evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑1801402 | Consideration on IAB evaluation methodology and parameters | Huawei, HiSilicon | imported from 3GU |
R1‑1801403 | Evaluation on the dynamic and flexible resource allocation in IAB | Huawei, HiSilicon | imported from 3GU |
R1‑1801404 | Remaining details of Synchronization Signal Design | ZTE, Sanechips | imported from 3GU |
R1‑1801405 | Remaining details of NR-PBCH Design | ZTE, Sanechips | imported from 3GU |
R1‑1801406 | Remaining details of RMSI | ZTE, Sanechips | imported from 3GU |
R1‑1801407 | Remaining details of OSI | ZTE, Sanechips | imported from 3GU |
R1‑1801408 | Remaining details of Paging | ZTE, Sanechips | imported from 3GU |
R1‑1801409 | Remaining details of PRACH Resource Configuration | ZTE, Sanechips | imported from 3GU |
R1‑180141 | - | - | - |
R1‑1801410 | Remaining details of RACH procedure | ZTE, Sanechips | imported from 3GU |
R1‑1801411 | Remaining details of RRM measurements | ZTE, Sanechips | imported from 3GU |
R1‑1801412 | Remaining details of RLM | ZTE, Sanechips | imported from 3GU |
R1‑1801413 | Draft skeleton of TR 38.812 (NOMA) | ZTE, Sanechips | imported from 3GU |
R1‑1801414 | Work plan for Rel-15 SI on NR NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1801415 | Transmitter side processing schemes for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1801416 | Typical multi-user receivers for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1801417 | Procedures related to NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1801418 | Link-level evaluation methodology and assumptions for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1801419 | System-level evaluation methodology and assumptions for NOMA | ZTE, Sanechips | imported from 3GU |
R1‑180142 | - | - | - |
R1‑1801420 | Preliminary link-level simulation results of NOMA | ZTE, Sanechips | imported from 3GU |
R1‑1801421 | Discussion on modified MCS table with TBS scaling factor 1 | Huawei, HiSilicon | imported from 3GU |
R1‑1801422 | Solutions to Rel-14 and Rel-15 UE Pool sharing | Huawei, HiSilicon | imported from 3GU |
R1‑1801423 | Discussion on latency reduction for eV2X | Huawei, HiSilicon | imported from 3GU |
R1‑1801424 | Mode 4 CA resource selection and power sharing for UE with limited TX capability | Huawei, HiSilicon | imported from 3GU |
R1‑1801425 | Performance evaluation of transmit diversity for eV2X | Huawei, HiSilicon | imported from 3GU |
R1‑1801426 | Transmit diversity solutions for PSSCH and PSCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1801427 | Remaining details for synchronization for carrier aggregation on sidelink | Huawei, HiSilicon | imported from 3GU |
R1‑1801428 | Cell search and system information acquisition improvements in eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1801429 | Early data transmission for eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑180143 | - | - | - |
R1‑1801430 | On 'wake-up signal' for eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1801431 | Further considerations on HARQ-ACK feedback for PUSCH in eFeMTC | Huawei, HiSilicon | imported from 3GU |
R1‑1801432 | On Sub-RB resource allocation for MTC PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1801433 | On functions of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1801434 | On configurations and procedures of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1801435 | On detailed design and evaluations of power saving signal | Huawei, HiSilicon | imported from 3GU |
R1‑1801436 | Use cases and design for physical layer scheduling request | Huawei, HiSilicon | imported from 3GU |
R1‑1801437 | On support of semi-persistent scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1801438 | Early data transmission in RACH for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1801439 | Common aspects for TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑180144 | - | - | - |
R1‑1801440 | On downlink TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1801441 | On uplink TDD NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1801442 | Remaining details of NB-IoT measurements improvement | Huawei, HiSilicon | imported from 3GU |
R1‑1801443 | On the support of NB-IoT small cell | Huawei, HiSilicon | imported from 3GU |
R1‑1801444 | Reduction of NB-IoT synchronization time | Huawei, HiSilicon | imported from 3GU |
R1‑1801445 | Reduction of NB-IoT system information acquisition time | Huawei, HiSilicon | imported from 3GU |
R1‑1801446 | NPRACH enhancement for cell radius extension | Huawei, HiSilicon | imported from 3GU |
R1‑1801447 | On NPRACH false alarm reduction due to inter-cell interference | Huawei, HiSilicon | imported from 3GU |
R1‑1801448 | PUSCH Sub-PRB Design | Sierra Wireless, S.A. | imported from 3GU |
R1‑1801449 | Remaining issues on codebook based UL transmission | Huawei, HiSilicon | imported from 3GU |
R1‑180145 | - | - | - |
R1‑1801450 | Remaining issues on non-codebook based UL transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1801451 | Remaining issues on CSI measurement | Huawei, HiSilicon | imported from 3GU |
R1‑1801452 | Remianing issues on CSI reporting | Huawei, HiSilicon | imported from 3GU |
R1‑1801453 | Remaining issues on beam management | Huawei, HiSilicon | imported from 3GU |
R1‑1801454 | Remaining issues on beam failure recovery | Huawei, HiSilicon | imported from 3GU |
R1‑1801455 | Remaining issues on CQI and MCS | Huawei, HiSilicon | imported from 3GU |
R1‑1801456 | Remaining issues on RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1801457 | Remaining issues on CSI-RS design | Huawei, HiSilicon | imported from 3GU |
R1‑1801458 | Remaining issues on DMRS design | Huawei, HiSilicon | imported from 3GU |
R1‑1801459 | Remaining issues on PTRS | Huawei, HiSilicon | imported from 3GU |
R1‑180146 | - | - | - |
R1‑1801460 | Remaining issues on TRS design | Huawei, HiSilicon | imported from 3GU |
R1‑1801461 | Remaining issues on QCL | Huawei, HiSilicon | imported from 3GU |
R1‑1801462 | Remaining details of UL power control design | Huawei, HiSilicon | imported from 3GU |
R1‑1801463 | Considerations for Simulation Methodology for NR-U operation | ZTE, Sanechips | imported from 3GU |
R1‑1801464 | Discussion on Deployment Scenarios for NR-U operation | ZTE, Sanechips | imported from 3GU |
R1‑1801465 | Perspective on Candidate Spectrum for NR-U operation | ZTE, Sanechips | imported from 3GU |
R1‑1801466 | Framework on potential solutions and techniques for NR-U | ZTE, Sanechips | imported from 3GU |
R1‑1801467 | Channel coding for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801468 | Evaluation of channel coding schemes | Huawei, HiSilicon | imported from 3GU |
R1‑1801469 | HARQ for polar codes | Huawei, HiSilicon | imported from 3GU |
R1‑180147 | - | - | - |
R1‑1801470 | Carrier selection and resource selection in SL CA | ZTE, Sanechips | imported from 3GU |
R1‑1801471 | Synchronization in Sidelink CA | ZTE, Sanechips | imported from 3GU |
R1‑1801472 | Discussion on transmit diversity for PC5 | ZTE, Sanechips | imported from 3GU |
R1‑1801473 | Evalution results of TxD | ZTE, Sanechips | imported from 3GU |
R1‑1801474 | Support for 64-QAM | ZTE, Sanechips | imported from 3GU |
R1‑1801475 | Resource pool sharing between mode 3 and mode 4 | ZTE, Sanechips | imported from 3GU |
R1‑1801476 | Consideration for maximum time reduction | ZTE, Sanechips | imported from 3GU |
R1‑1801477 | Evaluation of blockage in eV2X Channel Model for modeling eV2X blockage | ZTE, Sanechips | imported from 3GU |
R1‑1801478 | NR eV2X Evaluation Methodology further considerations | ZTE, Sanechips | imported from 3GU |
R1‑1801479 | Enhanced PSS Design Analysis | Sierra Wireless, S.A. | imported from 3GU |
R1‑180148 | - | - | - |
R1‑1801480 | Draft RRC parameter list for L1 configuration of Rel-15 LTE-MTC | Ericsson | imported from 3GU |
R1‑1801481 | Reduced system acquisition time for MTC | Ericsson | imported from 3GU |
R1‑1801482 | Early data transmission for MTC | Ericsson | imported from 3GU |
R1‑1801483 | Downlink channel power efficiency for MTC | Ericsson | imported from 3GU |
R1‑1801484 | Uplink HARQ-ACK feedback for MTC | Ericsson | imported from 3GU |
R1‑1801485 | PDSCH 64QAM support for MTC | Ericsson | imported from 3GU |
R1‑1801486 | PUSCH sub-PRB allocation for MTC | Ericsson | imported from 3GU |
R1‑1801487 | Flexible PDSCH/PUSCH starting PRB for MTC | Ericsson | imported from 3GU |
R1‑1801488 | Wake-up signal functions for NB-IoT | Ericsson | imported from 3GU |
R1‑1801489 | Wake-up signal configurations and procedures for NB-IoT | Ericsson | imported from 3GU |
R1‑180149 | - | - | - |
R1‑1801490 | Detailed design of wake-up signal for NB-IoT | Ericsson | imported from 3GU |
R1‑1801491 | Data transmission during random access procedure for NB-IoT | Ericsson | imported from 3GU |
R1‑1801492 | Physical layer scheduling request for NB-IoT | Ericsson | imported from 3GU |
R1‑1801493 | Semi-persistent scheduling for NB-IoT | Ericsson | imported from 3GU |
R1‑1801494 | Cell search time reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1801495 | System information acquisition time reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1801496 | Narrowband measurement accuracy improvements for NB-IoT | Ericsson | imported from 3GU |
R1‑1801497 | NB-IoT small cell support | Ericsson | imported from 3GU |
R1‑1801498 | NPRACH false alarm reduction for NB-IoT | Ericsson | imported from 3GU |
R1‑1801499 | NPRACH range enhancements for NB-IoT | Ericsson | imported from 3GU |
R1‑180150 | - | - | - |
R1‑1801500 | DL aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1801501 | UL aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1801502 | DL/UL common aspects of TDD for NB-IoT | Ericsson | imported from 3GU |
R1‑1801503 | Remaining issues for periodicity configurations | ZTE, Sanechips | imported from 3GU |
R1‑1801504 | On wake-up signals for efeMTC | vivo | imported from 3GU |
R1‑1801505 | On wake-up signals for feNB-IoT | vivo | imported from 3GU |
R1‑1801506 | Remaining issues on synchronization signal | vivo | imported from 3GU |
R1‑1801507 | Remaining aspects on NR-PBCH | vivo | imported from 3GU |
R1‑1801508 | Discussion on Remaining Minimum System Information | vivo | imported from 3GU |
R1‑1801509 | Remaining details on other system information delivery | vivo | imported from 3GU |
R1‑180151 | - | - | - |
R1‑1801510 | Remaining details on NR paging design | vivo | imported from 3GU |
R1‑1801511 | On N_TA and N_TA_offset configuration for NR-LTE co-existence | vivo | imported from 3GU |
R1‑1801512 | Remaining issues on RRM measurement | vivo | imported from 3GU |
R1‑1801513 | Remaining issues on RLM | vivo | imported from 3GU |
R1‑1801514 | Remaining issues on codeword mapping | vivo | imported from 3GU |
R1‑1801515 | Remaining issues on codebook based UL transmission | vivo | imported from 3GU |
R1‑1801516 | Remaining issues on non-codebook based UL transmission | vivo | imported from 3GU |
R1‑1801517 | Remaining issues on PRB bundling for DL | vivo | imported from 3GU |
R1‑1801518 | Remaining issues on CSI measurement | vivo | imported from 3GU |
R1‑1801519 | Remaining issues on CSI reporting | vivo | imported from 3GU |
R1‑180152 | - | - | - |
R1‑1801520 | Remaining issues on beam measurement and reporting | vivo | imported from 3GU |
R1‑1801521 | Remaining issues on mechanism to recover from beam failure | vivo | imported from 3GU |
R1‑1801522 | Remaining issues on CQI and MCS | vivo | imported from 3GU |
R1‑1801523 | Remaining issues on multiplexing of different types of RSs | vivo | imported from 3GU |
R1‑1801524 | Remaining issues on CSI-RS | vivo | imported from 3GU |
R1‑1801525 | Remaining issues on DMRS | vivo | imported from 3GU |
R1‑1801526 | Remaining issues on PT-RS | vivo | imported from 3GU |
R1‑1801527 | Remaining issues on SRS | vivo | imported from 3GU |
R1‑1801528 | Remaining issues on TRS | vivo | imported from 3GU |
R1‑1801529 | Remaining issues on QCL | vivo | imported from 3GU |
R1‑180153 | - | - | - |
R1‑1801530 | Remaining details on PDCCH structure | vivo | imported from 3GU |
R1‑1801531 | Remaining details on PDCCH search space | vivo | imported from 3GU |
R1‑1801532 | Remaining details on GC-PDCCH | vivo | imported from 3GU |
R1‑1801533 | Remaining details on DCI content and formats | vivo | imported from 3GU |
R1‑1801534 | On compact DCI | vivo | imported from 3GU |
R1‑1801535 | Remaining issues on PUCCH with short-duration | vivo | imported from 3GU |
R1‑1801536 | Remaining issues on PUCCH with long-duration | vivo | imported from 3GU |
R1‑1801537 | Remaining issues on UCI multiplexing | vivo | imported from 3GU |
R1‑1801538 | Remaining issues PUCCH resource allocation | vivo | imported from 3GU |
R1‑1801539 | Remaining issues on time-domain scheduling | vivo | imported from 3GU |
R1‑180154 | - | - | - |
R1‑1801540 | Remaining issues on HARQ management | vivo | imported from 3GU |
R1‑1801541 | Remaining issues on CBG-based (re)transmission | vivo | imported from 3GU |
R1‑1801542 | Remaining issues on UL data transmission procedure | vivo | imported from 3GU |
R1‑1801543 | Remaining issues on DL preemption | vivo | imported from 3GU |
R1‑1801544 | Remaining issues on BWP operation | vivo | imported from 3GU |
R1‑1801545 | Other aspects on carrier aggregation | vivo | imported from 3GU |
R1‑1801546 | Remaining issues on UL power control | vivo | imported from 3GU |
R1‑1801547 | Discussion on Rel-15 NR UE features | vivo | imported from 3GU |
R1‑1801548 | Discussion on compact DCI for URLLC | vivo | imported from 3GU |
R1‑1801549 | Discussion on PDCCH repetition for URLLC | vivo | imported from 3GU |
R1‑180155 | - | - | - |
R1‑1801550 | Discussion on handling UL multiplexing of transmissions with different reliability requirements | vivo | imported from 3GU |
R1‑1801551 | Other aspects for URLLC | vivo | imported from 3GU |
R1‑1801552 | Discussion on NOMA schemes from transmitter side perspective | vivo | imported from 3GU |
R1‑1801553 | Usage scenario and evaluation assumptions for NOMA | vivo | imported from 3GU |
R1‑1801554 | Remaining issues on eV2X evaluation methodology | vivo | imported from 3GU |
R1‑1801555 | Evaluation methodology for NR unlicensed spectrum | vivo | imported from 3GU |
R1‑1801556 | Deployment scenarios for NR unlicensed spectrum | vivo | imported from 3GU |
R1‑1801557 | Potential solutions and techniques for NR unlicensed spectrum | vivo | imported from 3GU |
R1‑1801558 | Design considerations for standalone operation in NR unlicensed spectrum | vivo | imported from 3GU |
R1‑1801559 | Measurement results and analysis on UE power consumption | vivo | imported from 3GU |
R1‑180156 | - | - | - |
R1‑1801560 | NR UE power saving | vivo | imported from 3GU |
R1‑1801561 | Remaining Issue of Soft Buffer Management | Ericsson | imported from 3GU |
R1‑1801562 | Remaining Issue of Polar Coding for DCI | Ericsson | imported from 3GU |
R1‑1801563 | CQI and MCS tables for URLLC | Ericsson | imported from 3GU |
R1‑1801564 | On Compact DCI for URLLC | Ericsson | imported from 3GU |
R1‑1801565 | On PDCCH repetition for URLLC | Ericsson | imported from 3GU |
R1‑1801566 | On Pre-emption in Uplink | Ericsson | imported from 3GU |
R1‑1801567 | Channel Coding Techniques for URLLC | Ericsson | imported from 3GU |
R1‑1801568 | On PUCCH for Ultra-Reliable Transmission | Ericsson | imported from 3GU |
R1‑1801569 | On Performance of PUCCH Format 0 for URLLC Use Cases | Ericsson | imported from 3GU |
R1‑180157 | - | - | - |
R1‑1801570 | On Performance of PUCCH Format 2 for URLLC Use Cases | Ericsson | imported from 3GU |
R1‑1801571 | On Frequency Hopping for Ultra-reliable Transmission | Ericsson | imported from 3GU |
R1‑1801572 | On transmit diversity for ultra-high reliability use cases | Ericsson | imported from 3GU |
R1‑1801573 | URLLC downlink system level simulation results | Ericsson | imported from 3GU |
R1‑1801574 | On supporting reliable HARQ feedback for UL transmission without grant | Ericsson | imported from 3GU |
R1‑1801575 | UCI Transmission for URLLC | Ericsson | imported from 3GU |
R1‑1801576 | Remaining details on CW to layer mapping | ZTE, Sanechips | imported from 3GU |
R1‑1801577 | Remaining details on codebook based UL transmission | ZTE, Sanechips | imported from 3GU |
R1‑1801578 | Remaining details on non-codebook based UL transmission | ZTE, Sanechips | imported from 3GU |
R1‑1801579 | Remaining details on CSI measurement | ZTE, Sanechips | imported from 3GU |
R1‑180158 | - | - | - |
R1‑1801580 | Remaining details on CSI reporting | ZTE, Sanechips | imported from 3GU |
R1‑1801581 | Remaining details on beam management | ZTE, Sanechips | imported from 3GU |
R1‑1801582 | Remaining details on beam recovery | ZTE, Sanechips | imported from 3GU |
R1‑1801583 | RRC parameter updates for CSI measurement | ZTE, Sanechips | imported from 3GU |
R1‑1801584 | Remaining details on RS multiplexing | ZTE, Sanechips | imported from 3GU |
R1‑1801585 | Remaining details on CSI-RS | ZTE, Sanechips | imported from 3GU |
R1‑1801586 | Remaining details on DMRS | ZTE, Sanechips | imported from 3GU |
R1‑1801587 | Remaining details on PT-RS | ZTE, Sanechips | imported from 3GU |
R1‑1801588 | Remaining details on SRS | ZTE, Sanechips | imported from 3GU |
R1‑1801589 | Remaining details on TRS | ZTE, Sanechips | imported from 3GU |
R1‑180159 | - | - | - |
R1‑1801590 | Remaining details on QCL | ZTE, Sanechips | imported from 3GU |
R1‑1801591 | Remaining details on NR power control in non-CA aspects | ZTE, Sanechips | imported from 3GU |
R1‑1801592 | Remaining details on on NR power control in CA aspects | ZTE, Sanechips | imported from 3GU |
R1‑1801593 | Draft CR on sPDCCH/PDCCH validation for semi-persistent scheduling sTTI | Huawei, HiSilicon | imported from 3GU |
R1‑1801594 | Corrections on n+3 timing in LAA | Huawei, HiSilicon | imported from 3GU |
R1‑1801595 | Introduction of FeCoMP into 36.212 | Huawei, HiSilicon | imported from 3GU |
R1‑1801596 | Discussion on NR UE feature list | MediaTek Inc. | imported from 3GU |
R1‑1801597 | Underlay SR: a complementary solution to overcome the limitations of periodic PUCCH-SR | Idaho National Laboratory | imported from 3GU |
R1‑1801598 | Further discussion on system acquisition time reduction for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1801599 | Remaining issues on UL HARQ-ACK feedback for MTC | ZTE, SaneChips | imported from 3GU |
R1‑180160 | - | - | - |
R1‑1801600 | Design of PUSCH sub-PRB allocation for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1801601 | Flexible starting PRB of PUSCH/PDSCH for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1801602 | Details on physical layer SR for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801603 | Considerations on physical layer aspects on SPS in NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801604 | Cell search enhancement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801605 | Remaining issues on system information acquisition improvement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801606 | Remaining issues on downlink aspects to support TDD NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801607 | Remaining issues on uplink aspects to support TDD NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801608 | Remaining issues on common aspects to support TDD NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801609 | Considerations on extended Power Headroom report for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑180161 | - | - | - |
R1‑1801610 | NPRACH range enhancement | ZTE, SaneChips | imported from 3GU |
R1‑1801611 | NPRACH reliability enhancement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801612 | On small cell support for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801613 | Discussion on candidates for measurement improvement for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801614 | Details design of wake up signal for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801615 | Discussion on wake up signal configuration for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801616 | Power consumption reduction for physical channels for MTC | ZTE, SaneChips | imported from 3GU |
R1‑1801617 | Wake up signal function for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801618 | On early data transmission for NB-IoT | ZTE, SaneChips | imported from 3GU |
R1‑1801619 | On early data transmission for eMTC | ZTE, SaneChips | imported from 3GU |
R1‑180162 | - | - | - |
R1‑1801620 | Discussion on NR unlicensed band operation | Potevio | imported from 3GU |
R1‑1801621 | PDCCH structure remaining issues | ZTE, Sanechips | imported from 3GU |
R1‑1801622 | Search space design and related issues | ZTE, Sanechips | imported from 3GU |
R1‑1801623 | Remaining issues for slot format | ZTE, Sanechips | imported from 3GU |
R1‑1801624 | Remaining issues on DCI content | ZTE, Sanechips | imported from 3GU |
R1‑1801625 | Remaining issues on short PUCCH | ZTE, Sanechips | imported from 3GU |
R1‑1801626 | Rmaining issues for Long PUCCH | ZTE, Sanechips | imported from 3GU |
R1‑1801627 | Remaining issues for UCI over PUSCH | ZTE, Sanechips | imported from 3GU |
R1‑1801628 | Remaining issues for PUCCH resource allocation | ZTE, Sanechips | imported from 3GU |
R1‑1801629 | Remaining issues for data resource allocation | ZTE, Sanechips | imported from 3GU |
R1‑180163 | - | - | - |
R1‑1801630 | Issues for scell BWP | ZTE, Sanechips | imported from 3GU |
R1‑1801631 | Considerations on CQI /MCS table(s) and related aspects for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801632 | On new DCI format for URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801633 | Discussion of PDCCH repetition | ZTE, Sanechips | imported from 3GU |
R1‑1801634 | Support of UL multiplexing of transmissions with different reliability requirements | ZTE, Sanechips | imported from 3GU |
R1‑1801635 | On short PUCCH enhancement for NR URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801636 | Discussion on Measurement for Mobility Management | MediaTek Inc. | imported from 3GU |
R1‑1801637 | Discussion on Radio Link Monitoring | MediaTek Inc. | imported from 3GU |
R1‑1801638 | Remaining details on bandwidth part operation in NR | MediaTek Inc. | imported from 3GU |
R1‑1801639 | Power offset between PSS, PDCCH and SSS | MediaTek Inc. | imported from 3GU |
R1‑180164 | - | - | - |
R1‑1801640 | Discussion on RAN2 about RRC Configuration for Sync Raster and Channel Raster | MediaTek Inc. | imported from 3GU |
R1‑1801641 | Remaining issues for NR-PBCH | MediaTek Inc. | imported from 3GU |
R1‑1801642 | Remaining issues for RMSI | MediaTek Inc. | imported from 3GU |
R1‑1801643 | Remaining issues for OSI | MediaTek Inc. | imported from 3GU |
R1‑1801644 | Remaining issues for Paging | MediaTek Inc. | imported from 3GU |
R1‑1801645 | Remaining details on PDCH structure | MediaTek Inc. | imported from 3GU |
R1‑1801646 | Remaining details on search space | MediaTek Inc. | imported from 3GU |
R1‑1801647 | Reamining details on group-common PDCCH | MediaTek Inc. | imported from 3GU |
R1‑1801648 | UE capability on BWP features | MediaTek Inc. | imported from 3GU |
R1‑1801649 | Remaining issues in carrier aggregation | MediaTek Inc. | imported from 3GU |
R1‑180165 | - | - | - |
R1‑1801650 | Remaining issues on beam management | MediaTek Inc. | imported from 3GU |
R1‑1801651 | Remaining issues on beam failure recovery | MediaTek Inc. | imported from 3GU |
R1‑1801652 | Remaining issues in non-codebook based transmission for UL | MediaTek Inc. | imported from 3GU |
R1‑1801653 | Remaining isuses in CSI measurement | MediaTek Inc. | imported from 3GU |
R1‑1801654 | Remaining issues in CSI reporting | MediaTek Inc. | imported from 3GU |
R1‑1801655 | Remaining issues in SRS | MediaTek Inc. | imported from 3GU |
R1‑1801656 | Considerations on NR Unlicensed Channel Access | MediaTek Inc. | imported from 3GU |
R1‑1801657 | On NR-U simulation methodology | MediaTek Inc. | imported from 3GU |
R1‑1801658 | Considerations on initial access in NR unlicensed bands | MediaTek Inc. | imported from 3GU |
R1‑1801659 | Remaining details on PRACH formats | MediaTek Inc. | imported from 3GU |
R1‑180166 | - | - | - |
R1‑1801660 | Remaining details on RACH procedure | MediaTek Inc. | imported from 3GU |
R1‑1801661 | Remaining issues of long-PUCCH | MediaTek Inc. | imported from 3GU |
R1‑1801662 | Remaining issues of UCI on PUSCH | MediaTek Inc. | imported from 3GU |
R1‑1801663 | Remaining issues of DLUL scheduling and HARQ management | MediaTek Inc. | imported from 3GU |
R1‑1801664 | Remaining issues of UL power control | MediaTek Inc. | imported from 3GU |
R1‑1801665 | Channel coding for URLLC data channels | MediaTek Inc. | imported from 3GU |
R1‑1801666 | On PDCCH repetition for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1801667 | remaining issues on PRB bundling | MediaTek Inc. | imported from 3GU |
R1‑1801668 | remaining issues on CSI-RS | MediaTek Inc. | imported from 3GU |
R1‑1801669 | remaining issues on DMRS | MediaTek Inc. | imported from 3GU |
R1‑180167 | - | - | - |
R1‑1801670 | remaining issues on TRS | MediaTek Inc. | imported from 3GU |
R1‑1801671 | remaining issues on QCL | MediaTek Inc. | imported from 3GU |
R1‑1801672 | CQI reporting for multiple services in NR | MediaTek Inc. | imported from 3GU |
R1‑1801673 | ACK/NACK feedback reliability for LTE URLLC | MediaTek Inc. | imported from 3GU |
R1‑1801674 | On UL multiplexing of transmissions with different reliability targets | MediaTek Inc. | imported from 3GU |
R1‑1801675 | Analysis of Compact DCI | MediaTek Inc. | imported from 3GU |
R1‑1801676 | MCS and CQI Tables design for URLLC | MediaTek Inc. | imported from 3GU |
R1‑1801677 | On Remaining Issues for the DCI Content and Formats | MediaTek Inc. | imported from 3GU |
R1‑1801678 | ACK/NACK feedback reliability for NR URLLC | MediaTek Inc. | imported from 3GU |
R1‑1801679 | On UL configured grant for URLLC | MediaTek Inc. | imported from 3GU |
R1‑180168 | - | - | - |
R1‑1801680 | Remaining issues on DL pre-emption indication | MediaTek Inc. | imported from 3GU |
R1‑1801681 | Remaining details on UL/DL Resource Allocation | MediaTek Inc. | imported from 3GU |
R1‑1801682 | Wake Up Signal Functions for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1801683 | Wake Up Signal Configuration for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1801684 | Wake Up Signal Design for NB-IoT | MediaTek Inc. | imported from 3GU |
R1‑1801685 | Scheduling Request for NB-IOT | MediaTek Inc. | imported from 3GU |
R1‑1801686 | Early Data Termination TBS Determination | MediaTek Inc. | imported from 3GU |
R1‑1801687 | DL Data Control Enhancement for HRLLC | MediaTek Inc. | imported from 3GU |
R1‑1801688 | DL Data Channel Enhancement for HRLLC | MediaTek Inc. | imported from 3GU |
R1‑1801689 | Discussion on Modulation Enhancements | MediaTek Inc. | imported from 3GU |
R1‑180169 | - | - | - |
R1‑1801690 | PHICH assignment issue for special subframe configuration 10 | MediaTek Inc. | imported from 3GU |
R1‑1801691 | Draft CR 36.213 PHICH assignment issue for special subframe configuration 10 | MediaTek Inc. | imported from 3GU |
R1‑1801692 | Draft CR 36.211 PHICH assignment issue for special subframe configuration 10 | MediaTek Inc. | imported from 3GU |
R1‑1801693 | Clarification on PDCCH behavior for sTTI (under internal discussion) | MediaTek Inc. | imported from 3GU |
R1‑1801694 | LTE CP latency reduction | MediaTek Inc. | imported from 3GU |
R1‑1801695 | PUCCH resource allocation prior to RRC configuration | NEC | imported from 3GU |
R1‑1801696 | Missing details of the Frequency hopping for UL NR | NEC | imported from 3GU |
R1‑1801697 | SPS Activation and Deactivations in NR | NEC | imported from 3GU |
R1‑1801698 | Discussion on NoMA study for Rel-15 SI | NEC | imported from 3GU |
R1‑1801699 | ACK/NACK feedback reliability for LTE URLLC | MediaTek Inc. | imported from 3GU |
R1‑180170 | - | - | - |
R1‑1801700 | Draft LS reply to RAN2 on beam failure recovery | CATT | imported from 3GU |
R1‑1801701 | Discussion on carrier aggregation for mode 4 in V2X phase 2 | CATT | imported from 3GU |
R1‑1801702 | Discussion on synchronization for carrier aggregation in V2X Phase 2 | CATT | imported from 3GU |
R1‑1801703 | Discussion on 64QAM support in V2X phase 2 | CATT | imported from 3GU |
R1‑1801704 | Discussion on Tx diversity schemes in PC5 | CATT | imported from 3GU |
R1‑1801705 | Evaluation results for Tx diversity schemes in PC5 | CATT | imported from 3GU |
R1‑1801706 | Discussion on resource pool sharing between mode 3 and mode 4 | CATT | imported from 3GU |
R1‑1801707 | Discussion on latency reduction between packet arrival and resource selection | CATT | imported from 3GU |
R1‑1801708 | Remaining Issues on NR PBCH | CATT | imported from 3GU |
R1‑1801709 | Remaining Issues on RMSI | CATT | imported from 3GU |
R1‑180171 | - | - | - |
R1‑1801710 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1801711 | Further details on NR RACH format | CATT | imported from 3GU |
R1‑1801712 | Further details on NR 4-step RA Procedure | CATT | imported from 3GU |
R1‑1801713 | Remaining Issues on NR Mobility Management | CATT | imported from 3GU |
R1‑1801714 | Remaining Issues on NR Radio Link Monitoring | CATT | imported from 3GU |
R1‑1801715 | Remaining issues on codeword mapping | CATT | imported from 3GU |
R1‑1801716 | Remaining issues on codebook based UL transmission | CATT | imported from 3GU |
R1‑1801717 | Remaining issues on non-codebook based UL transmission | CATT | imported from 3GU |
R1‑1801718 | Remaining issues on PRB bundling | CATT | imported from 3GU |
R1‑1801719 | Remaining issues on CSI measurement | CATT | imported from 3GU |
R1‑180172 | - | - | - |
R1‑1801720 | Remaining issues on CSI reporting | CATT | imported from 3GU |
R1‑1801721 | Remaining issues on beam management | CATT | imported from 3GU |
R1‑1801722 | Remaining issues on beam failure recovery | CATT | imported from 3GU |
R1‑1801723 | Remaining issues on CSI-RS | CATT | imported from 3GU |
R1‑1801724 | Remaining issues on DMRS | CATT | imported from 3GU |
R1‑1801725 | Remaining issues on PT-RS | CATT | imported from 3GU |
R1‑1801726 | Remaining issues on SRS | CATT | imported from 3GU |
R1‑1801727 | Remaining issues on QCL | CATT | imported from 3GU |
R1‑1801728 | Remaining issues on NR PDCCH search space | CATT | imported from 3GU |
R1‑1801729 | Remaining details of slot format indication | CATT | imported from 3GU |
R1‑180173 | - | - | - |
R1‑1801730 | Open issues on DCI contents and formats | CATT | imported from 3GU |
R1‑1801731 | Multiplexing of UCI transmissions of different durations or configurations | CATT | imported from 3GU |
R1‑1801732 | Remaining issues on long PUCCH formats | CATT | imported from 3GU |
R1‑1801733 | Remaining details of UCI multiplexing on PUSCH | CATT | imported from 3GU |
R1‑1801734 | PUCCH resource allocation | CATT | imported from 3GU |
R1‑1801735 | Outstanding details of NR PDSCH and PUSCH resource allocation | CATT | imported from 3GU |
R1‑1801736 | On NR HARQ timing and management | CATT | imported from 3GU |
R1‑1801737 | Open issues on CBG-based (re)transmission | CATT | imported from 3GU |
R1‑1801738 | Remaining issues on grant-free UL transmission | CATT | imported from 3GU |
R1‑1801739 | Remaining details of DL pre-emption indication | CATT | imported from 3GU |
R1‑180174 | - | - | - |
R1‑1801740 | Remaining details of NR CA operation | CATT | imported from 3GU |
R1‑1801741 | Remaining issues on rate matching for PDSCH and PUSCH | CATT | imported from 3GU |
R1‑1801742 | Remaining issues on LTE-NR co-existence | CATT | imported from 3GU |
R1‑1801743 | Linkage of PUSCH power control parameters without Explicit Indication in the DCI | CATT | imported from 3GU |
R1‑1801744 | Linkage of PUCCH power control parameters without Explicit Indication | CATT | imported from 3GU |
R1‑1801745 | Power control parameters setting for grant free transmission in multi-beam configuration | CATT | imported from 3GU |
R1‑1801746 | Correction on NR PUCCH Power Control Formula | CATT | imported from 3GU |
R1‑1801747 | Correction on NR EN-DC Power Sharing | CATT | imported from 3GU |
R1‑1801748 | CQI and MCS design for NR URLLC | CATT | imported from 3GU |
R1‑1801749 | Necessity of a compact DCI format for NR URLLC | CATT | imported from 3GU |
R1‑180175 | - | - | - |
R1‑1801750 | Discussion on enhanced PDCCH for NR URLLC | CATT | imported from 3GU |
R1‑1801751 | Multiplexing of UL transmissions of different reliability requirements | CATT | imported from 3GU |
R1‑1801752 | PUCCH enhancement for URLLC | CATT | imported from 3GU |
R1‑1801753 | NOMA transmitter side signal processing | CATT | imported from 3GU |
R1‑1801754 | Discussion on NOMA receivers | CATT | imported from 3GU |
R1‑1801755 | Discussion on NOMA procedures | CATT | imported from 3GU |
R1‑1801756 | Evaluation assumptions for NOMA | CATT | imported from 3GU |
R1‑1801757 | Discusion on evaluation scenarios of new V2X use cases | CATT | imported from 3GU |
R1‑1801758 | Discussion on channle models of new V2X use cases | CATT | imported from 3GU |
R1‑1801759 | Simulation Methodology for NR Unlicensed operations | CATT | imported from 3GU |
R1‑180176 | - | - | - |
R1‑1801760 | Deployment Scenarios for NR Unlicensed operations | CATT | imported from 3GU |
R1‑1801761 | Candidate Spectrum for Unlicensed Operations | CATT | imported from 3GU |
R1‑1801762 | Techniques for NR Unlicensed Operations | CATT | imported from 3GU |
R1‑1801763 | Aspect of standalone operation in NR Unlicensed Spectrum | CATT | imported from 3GU |
R1‑1801764 | Discussions on detailed link budget evaluation methodology | CATT | imported from 3GU |
R1‑1801765 | Discussions on calculation of shadow fading margin for link budget | CATT | imported from 3GU |
R1‑1801766 | Discussions on penetration margin and SD for link budget | CATT | imported from 3GU |
R1‑1801767 | Discussions on system level simulation configurations and technical features for self evaluation | CATT | imported from 3GU |
R1‑1801768 | Initial self evaluation on peak data rate and peak spectrum efficiency | CATT | imported from 3GU |
R1‑1801769 | Initial self evaluation for Indoor Hotspot-eMBB | CATT | imported from 3GU |
R1‑180177 | - | - | - |
R1‑1801770 | Initial self evaluation for Dense Urban-eMBB | CATT | imported from 3GU |
R1‑1801771 | Initial self evaluation for Rural-eMBB | CATT | imported from 3GU |
R1‑1801772 | Correction on UL control channel for short TTI | ZTE, Sanechips | imported from 3GU |
R1‑1801773 | Correction on DL data channel for short TTI | ZTE, Sanechips | imported from 3GU |
R1‑1801774 | System-level evaluations for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801775 | Discussion on PDCCH related techniques for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801776 | Discussion on PDSCH related techniques for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801777 | Discussion on PUCCH related techniques for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801778 | Discussion on PUSCH related techniques for LTE URLLC | ZTE, Sanechips | imported from 3GU |
R1‑1801779 | TP on UE behavior for determining slot format | Huawei, HiSilicon | imported from 3GU |
R1‑180178 | - | - | - |
R1‑1801780 | Consideration on power saving for NR CA | Huawei, HiSilicon | imported from 3GU |
R1‑1801781 | PDCCH repetition for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801782 | CSI feedback enhancements for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801783 | Support of 60 kHz subcarrier spacing | Huawei, HiSilicon | imported from 3GU |
R1‑1801784 | PUCCH resource allocation for non-slot scheduling | Huawei, HiSilicon | imported from 3GU |
R1‑1801785 | Considerations on DMRS to support URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801786 | Summary of remaining issues on UL data transmission procedure | Huawei, HiSilicon | imported from 3GU |
R1‑1801787 | Reliability enhancement for grant-free transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1801788 | Discussion on partially overlapped PUCCH and PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1801789 | General consideration on IMT-2020 self evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑180179 | - | - | - |
R1‑1801790 | Initial evaluation results of eMBB spectral efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1801791 | Consideration on self evaluation of IMT-2020 for user experienced data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1801792 | Consideration on self evaluation of IMT-2020 for area traffic capacity | Huawei, HiSilicon | imported from 3GU |
R1‑1801793 | Consideration on self evaluation of IMT-2020 for high mobility | Huawei, HiSilicon | imported from 3GU |
R1‑1801794 | Consideration on self evaluation of IMT-2020 for peak spectral efficiency and peak data rate | Huawei, HiSilicon | imported from 3GU |
R1‑1801795 | Consideration on self evaluation of IMT-2020 for energy efficiency | Huawei, HiSilicon | imported from 3GU |
R1‑1801796 | Consideration on self evaluation of IMT-2020 for mMTC connection density | Huawei, HiSilicon | imported from 3GU |
R1‑1801797 | Consideration on self evaluation of IMT-2020 for reliability | Huawei, HiSilicon | imported from 3GU |
R1‑1801798 | UE-to-UE measurement for cross-link interference mitigation | Huawei, HiSilicon | imported from 3GU |
R1‑1801799 | Timing alignment on cross-link | Huawei, HiSilicon | imported from 3GU |
R1‑180180 | - | - | - |
R1‑1801800 | UL Power control for cross-link interference mitigation | Huawei, HiSilicon | imported from 3GU |
R1‑1801801 | Consideration on GEO and LEO channel models | Huawei, HiSilicon | imported from 3GU |
R1‑1801802 | Consideration on HAPS channel models | Huawei, HiSilicon | imported from 3GU |
R1‑1801803 | TP for power control for EN-DC in TS38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1801804 | TP on mapping to resource block of RA type 0 | Huawei, HiSilicon | imported from 3GU |
R1‑1801805 | Remaining issues on DL PRB bundling | Huawei, HiSilicon | imported from 3GU |
R1‑1801806 | Remaining issues on SRS design | Huawei, HiSilicon | imported from 3GU |
R1‑1801807 | Draft LS on MAC CEs for BM and CSI | Huawei, HiSilicon | imported from 3GU |
R1‑1801808 | Remaining details for uplink power control with CA | Huawei, HiSilicon | imported from 3GU |
R1‑1801809 | UE capability of type II codebook | Huawei, HiSilicon | imported from 3GU |
R1‑180181 | - | - | - |
R1‑1801810 | Discussion on BWP switching impact on MIMO and RS design | Huawei, HiSilicon | imported from 3GU |
R1‑1801811 | LS response to RAN2 on beam failure recovery | Huawei, HiSilicon | imported from 3GU |
R1‑1801812 | Remaining issue for uplink HARQ-ACK feedback in efeMTC | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801813 | Views on TDD downlink aspect | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801814 | Discussion on Mode 4 support for V2X carrier aggregation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801815 | Discussion on Pool sharing for V2X Phase 2 | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801816 | Discussion on Latency Reduction for V2X Phase 2 | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801817 | On multiplexing between UCIs and between PUCCH and PUSCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801818 | Remaining issues on PUCCH resource allocation | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801819 | Remaining issues on CSI-RS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑180182 | - | - | - |
R1‑1801820 | Remaining issues on PTRS | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801821 | Remaining details on NR-PBCH | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801822 | Discussion on time gap of TA adjustment | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801823 | remaining issues on codebook based transmission for UL | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801824 | remaining issues on non-codebook based transmission for UL | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801825 | Remaining details on beam failure recovery | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801826 | Remaining issues on beam meaurement and reporting | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801827 | Fallback operation for semi-static HARQ-ACK codebook determination | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801828 | Remaining issues for CA with different numerologies | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1801829 | Discussion on the channel model for NTN | ZTE, Sanechips | imported from 3GU |
R1‑180183 | - | - | - |
R1‑1801830 | Considerations on the random access procedure for NTN | ZTE, Sanechips | imported from 3GU |
R1‑1801831 | Channel Coding for URLLC | Tsofun Algorithm Ltd. | imported from 3GU |
R1‑1801832 | Remaining issues on CSI-RS | Spreadtrum Communications | imported from 3GU |
R1‑1801833 | Remaining issues on DMRS | Spreadtrum Communications | imported from 3GU |
R1‑1801834 | Remaining issues on PT-RS | Spreadtrum Communications | imported from 3GU |
R1‑1801835 | Remaining issues on non-codebook based UL | Spreadtrum Communications | imported from 3GU |
R1‑1801836 | Correction of OFDM signal generation | Spreadtrum Communications | imported from 3GU |
R1‑1801837 | Remaining issues on PDCCH structure | Spreadtrum Communications | imported from 3GU |
R1‑1801838 | Remaining issues on paging design | Spreadtrum Communications | imported from 3GU |
R1‑1801839 | Discussion on SS/PBCH block for NR unlicensed | Spreadtrum Communications | imported from 3GU |
R1‑180184 | - | - | - |
R1‑1801840 | Discussion on PDCCH repetition for URLLC | Spreadtrum Communications | imported from 3GU |
R1‑1801841 | Consideration on Simulation for mMTC Self-evaluation | Spreadtrum Communications | imported from 3GU |
R1‑1801842 | Remaining issues on BWP | Spreadtrum Communications | imported from 3GU |
R1‑1801843 | Remaining issues on RACH | Spreadtrum Communications | imported from 3GU |
R1‑1801844 | Text proposal on RRM measurement | Spreadtrum Communications | imported from 3GU |
R1‑1801845 | Considerations of the LBT procedures on NR unlicensed band | Spreadtrum Communications | imported from 3GU |
R1‑1801846 | Considerations on MA signature allocation/selection | Spreadtrum Communications | imported from 3GU |
R1‑1801847 | Remaining issues on CSI reporting | Spreadtrum Communications | imported from 3GU |
R1‑1801848 | Clarification on number of UL HARQ processes for TDD config 0 and symPUSCH-UpPts-r14 for shortened processing time (36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801849 | Correction of PUSCH scheduling limitations for shortend processing time (36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180185 | - | - | - |
R1‑1801850 | Correction on UCI HARQ-Ack on FDD-TDD CA for shortened processing time (36.212) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801851 | Correction of reference subframe definition for FS3 PUSCH contention window size update with SPT (36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801852 | Needed changes in 36.213 to TDD UL index based PUSCH scheduling for SPT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801853 | Changes to PDSCH /SPDSCH interaction procedures in 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801854 | Enabling transmit diversity fallback for DL TM 6, 8, 9 and 10 for shorter TTI (36.212, 36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801855 | Corrections on DL control for shorter TTI in 36.211 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801856 | Corrections on PDCCH/SPDCCH assignment procedure for shorter TTI in 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801857 | Changes to FS2 SRS triggering for shorter TTI (36.212, 36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801858 | Correction of DM-RS position indication in DCI Formats scheduling subslot PDSCH (36.212) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801859 | Changes on PDSCH procedures in 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180186 | - | - | - |
R1‑1801860 | Corrections on DM-RS for slot PDSCH (36.211) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801861 | Correction of SPS PUSCH activation/release for shorter TTI (36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801862 | Changes on K_PUSCH for FS2 slot-PUSCH in 36.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801863 | Changes in 36.213 to TDD UL index based slot PUSCH scheduling | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801864 | Summary of [91-LTE-10] Email discussion on candidate techniques for LTE URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801865 | On DL control enhancements for LTE URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801866 | On PDSCH enhancements for LTE URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1801867 | Remaining issues on SPS | Huawei, HiSilicon | imported from 3GU |
R1‑1801868 | Remaining details of evaluations | Huawei, HiSilicon | imported from 3GU |
R1‑1801869 | CSI and MCS design for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑180187 | - | - | - |
R1‑1801870 | Codebook Subset Restriction in advanced CSI | Huawei, HiSilicon | imported from 3GU |
R1‑1801871 | On SRS antenna switching for 4 transmission ports | Huawei, HiSilicon | imported from 3GU |
R1‑1801872 | PDSCH design for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801873 | Compact DCI for LTE URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1801874 | Discussion on collision between sTTI and TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1801875 | Draft CR on valid NDI of UL CWS adjustment for eLAA in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1801876 | Text proposal on collision between sTTI and TTI | Huawei, HiSilicon | imported from 3GU |
R1‑1801877 | Corrections on sPUCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1801878 | SRS triggering for TDD with sDCI | Huawei, HiSilicon | imported from 3GU |
R1‑1801879 | Introduction of CBSR in advanced CSI in TS36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑180188 | - | - | - |
R1‑1801880 | CQI table for 64-QAM | Huawei, HiSilicon | imported from 3GU |
R1‑1801881 | On more flexible starting PRB for PDSCH/PUSCH resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑1801882 | On NPUSCH uplink compensation gaps for 2 HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑1801883 | On potential mismatch between UL and DL coverage enhancement in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R1‑1801884 | Correction on PUCCH resource determination in HARQ-ACK bundling | Huawei, HiSilicon | imported from 3GU |
R1‑1801885 | On NPRS for OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑1801886 | Correction on DwPTS usage in special subframe configuration 10 | Huawei, HiSilicon, Rohde & Schwarz, CMCC | imported from 3GU |
R1‑1801887 | LLS baseline calibration assumptions and performance results for NOMA study | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1801888 | Spectral Efficiency of NOMA-Optimized LDPC Code vs. LTE Turbo Code for UL NOMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑1801889 | ACMA-OFDM and Low PAPR ACMA for Uplink NOMA | HUGHES Network Systems Ltd | imported from 3GU |
R1‑180189 | - | - | - |
R1‑1801890 | TP for PRACH transmit power | Fujitsu | imported from 3GU |
R1‑1801891 | Discussion on ambiguity about TA determination in case of multiple configured UL BWPs with different numerologies | Fujitsu | imported from 3GU |
R1‑1801892 | Ambiguities about beam indication and aperiodic CSI-RS triggering offset configuration in some cases | Fujitsu | imported from 3GU |
R1‑1801893 | On compact DCI for URLLC | Fujitsu | imported from 3GU |
R1‑1801894 | On UL multiplexing of transmissions with different reliability requirements | Fujitsu | imported from 3GU |
R1‑1801895 | Simulation result of UCI piggyback on PUSCH with URLLC data | Fujitsu | imported from 3GU |
R1‑1801896 | Considerations on NOMA related procedures | Fujitsu | imported from 3GU |
R1‑1801897 | NB-IoT TDD UL PRACH for UL/DL configuration #2 | IITH | imported from 3GU |
R1‑1801898 | Remaining issues on beam reporting | NEC | imported from 3GU |
R1‑1801899 | Discussion on potential functionalities and solutions for NR unlicensed | NEC | imported from 3GU |
R1‑180190 | - | - | - |
R1‑1801900 | Discussion on deployment scenarios for NR unlicensed | NEC | imported from 3GU |
R1‑1801901 | Remaining issues on multi-CSI PUCCH | NEC | imported from 3GU |
R1‑1801902 | Remaining issues on PTRS configurations | NEC | imported from 3GU |
R1‑1801903 | Considerations on LBT in NR-based access to unlicensed spectrum | CATR | imported from 3GU |
R1‑1801904 | Discussion on the deployment scenarios for NR unlicensed operation | CATR | imported from 3GU |
R1‑1801905 | Remaining issues on UCI multiplexing on PUSCH | CATR | imported from 3GU |
R1‑1801906 | Text Proposal for modulation order, redundancy version, and transport block size determination of PUSCH | CATR | imported from 3GU |
R1‑1801907 | UCI transmission on grant-free PUSCH | CATR | imported from 3GU |
R1‑1801908 | UL multiplexing for eMBB and URLLC | CATR | imported from 3GU |
R1‑1801909 | Codebook subset restriction for advanced CSI codebook | Samsung | imported from 3GU |
R1‑180191 | - | - | - |
R1‑1801910 | Discussion on measurement report for NB-IoT | Samsung | imported from 3GU |
R1‑1801911 | New Modulation table for throughput enhancement | Samsung | imported from 3GU |
R1‑1801912 | Corrections on processing time with 1ms TTI | Samsung | imported from 3GU |
R1‑1801913 | Corrections on HARQ process ID for UL grant with slot TTI | Samsung | imported from 3GU |
R1‑1801914 | Multiple starting and ending positions for UL | Samsung | imported from 3GU |
R1‑1801915 | Resource allocation for autonomous UL access | Samsung | imported from 3GU |
R1‑1801916 | HARQ for autonomous UL access | Samsung | imported from 3GU |
R1‑1801917 | Channel access for autonomous UL access | Samsung | imported from 3GU |
R1‑1801918 | Mode-4 support in V2X CA | Samsung | imported from 3GU |
R1‑1801919 | Synchronization in V2X CA | Samsung | imported from 3GU |
R1‑180192 | - | - | - |
R1‑1801920 | High order modulation in V2X | Samsung | imported from 3GU |
R1‑1801921 | Resource pool sharing among mode 3/4 UEs | Samsung | imported from 3GU |
R1‑1801922 | Discussion on latency smaller than 20 | Samsung | imported from 3GU |
R1‑1801923 | Discussion on enhanced synchronization signals and resynchronization signals | Samsung | imported from 3GU |
R1‑1801924 | Early data transmission for eMTC | Samsung | imported from 3GU |
R1‑1801925 | DL power consumption reduction for eMTC | Samsung | imported from 3GU |
R1‑1801926 | Group DCI for uplink HARQ-ACK feedback | Samsung | imported from 3GU |
R1‑1801927 | Discussion on sub-PRB allocation for eFeMTC | Samsung | imported from 3GU |
R1‑1801928 | Discussion on Flexible PDSCH/PUSCH starting PRB | Samsung | imported from 3GU |
R1‑1801929 | Discussion on Wake up signal configuration | Samsung | imported from 3GU |
R1‑180193 | - | - | - |
R1‑1801930 | Discussion on WUS Sequence Design | Samsung | imported from 3GU |
R1‑1801931 | Early data transmission for NB-IoT | Samsung | imported from 3GU |
R1‑1801932 | Discussion on scheduling request for NB IoT | Samsung | imported from 3GU |
R1‑1801933 | New SPS mechanism for power saving | Samsung | imported from 3GU |
R1‑1801934 | Power control for extend coverage UE | Samsung | imported from 3GU |
R1‑1801935 | Reliability enhancements for NPRACH | Samsung | imported from 3GU |
R1‑1801936 | Range enhancements for NPRACH | Samsung | imported from 3GU |
R1‑1801937 | Discussion on DL common channel signal for TDD NB-IoT | Samsung | imported from 3GU |
R1‑1801938 | Discussion on UL channel for TDD NB-IoT | Samsung | imported from 3GU |
R1‑1801939 | Discussion on 2 HARQ processes and cross carrier scheduling | Samsung | imported from 3GU |
R1‑180194 | - | - | - |
R1‑1801940 | Enhanced PHR for NB-IOT | Samsung | imported from 3GU |
R1‑1801941 | Discussion on DL control related techniques for URLLC | Samsung | imported from 3GU |
R1‑1801942 | Discussion on PDSCH related techniques for URLLC | Samsung | imported from 3GU |
R1‑1801943 | Discussion on UL control related techniques for URLLC | Samsung | imported from 3GU |
R1‑1801944 | Discussion on PUSCH related techniques for URLLC | Samsung | imported from 3GU |
R1‑1801945 | Corrections on Synchronization Signaling | Samsung | imported from 3GU |
R1‑1801946 | Corrections on NR-PBCH | Samsung | imported from 3GU |
R1‑1801947 | Corrections on Remaining Minimum System Information | Samsung | imported from 3GU |
R1‑1801948 | Corrections on Other System Information Delivery | Samsung | imported from 3GU |
R1‑1801949 | Corrections on Paging Design | Samsung | imported from 3GU |
R1‑180195 | - | - | - |
R1‑1801950 | Corrections on PRACH Formats | Samsung | imported from 3GU |
R1‑1801951 | Corrections on RACH Procedure | Samsung | imported from 3GU |
R1‑1801952 | Corrections on Measurements for Mobility Management | Samsung | imported from 3GU |
R1‑1801953 | Corrections on Radio Link Monitoring for Mobility Management | Samsung | imported from 3GU |
R1‑1801954 | Corrections on Timing Advance | Samsung | imported from 3GU |
R1‑1801955 | Summary of issues on codeword mapping | Samsung | imported from 3GU |
R1‑1801956 | Issues on codebook based UL transmisison | Samsung | imported from 3GU |
R1‑1801957 | CSI-RS resource configuration for non-codebook-based transmission | Samsung | imported from 3GU |
R1‑1801958 | Issues on trigger state definition | Samsung | imported from 3GU |
R1‑1801959 | Issues on CSI measurement | Samsung | imported from 3GU |
R1‑180196 | - | - | - |
R1‑1801960 | Issues on UCI for A-CSI reporting | Samsung | imported from 3GU |
R1‑1801961 | Issues on CSI reporting | Samsung | imported from 3GU |
R1‑1801962 | Corrections on beam reporting and indication | Samsung | imported from 3GU |
R1‑1801963 | Corrections on beam failure recovery | Samsung | imported from 3GU |
R1‑1801964 | Aperiodic beam reporting | Samsung | imported from 3GU |
R1‑1801965 | Corrections on UL beam management | Samsung | imported from 3GU |
R1‑1801966 | Issues on RS multiplexing | Samsung | imported from 3GU |
R1‑1801967 | Issues on CSI-RS | Samsung | imported from 3GU |
R1‑1801968 | Issues on DMRS | Samsung | imported from 3GU |
R1‑1801969 | Issues on LI reporting for PTRS | Samsung | imported from 3GU |
R1‑180197 | - | - | - |
R1‑1801970 | Issues on PTRS | Samsung | imported from 3GU |
R1‑1801971 | Issues on SRS | Samsung | imported from 3GU |
R1‑1801972 | Issues on TRS | Samsung | imported from 3GU |
R1‑1801973 | Corrections on PDCCH Structure | Samsung | imported from 3GU |
R1‑1801974 | Corrections on Search Space Design | Samsung | imported from 3GU |
R1‑1801975 | Corrections on UE-Group Common PDCCH | Samsung | imported from 3GU |
R1‑1801976 | DCI Contents and Formats | Samsung | imported from 3GU |
R1‑1801977 | On UE Power Savings | Samsung | imported from 3GU |
R1‑1801978 | Corrections on PUCCH for up to 2 Symbols | Samsung | imported from 3GU |
R1‑1801979 | Corrections on PUCCH for more than 2 Symbols | Samsung | imported from 3GU |
R1‑180198 | - | - | - |
R1‑1801980 | Corrections on UCI Multiplexing in PUSCH | Samsung | imported from 3GU |
R1‑1801981 | Corrections on Resource Allocation for PUCCH | Samsung | imported from 3GU |
R1‑1801982 | Corrections on DL/UL Resource Allocation | Samsung | imported from 3GU |
R1‑1801983 | Corrections on HARQ Management and Feedback | Samsung | imported from 3GU |
R1‑1801984 | Correction on Procedures for UL Transmissions | Samsung | imported from 3GU |
R1‑1801985 | On Soft Buffer Management | Samsung | imported from 3GU |
R1‑1801986 | Corrections on Multiplexing Data with Different Transmission Durations | Samsung | imported from 3GU |
R1‑1801987 | Remaining issues on DL SPS | Samsung | imported from 3GU |
R1‑1801988 | Corrections on Bandwidth Part Operation | Samsung | imported from 3GU |
R1‑1801989 | Corrections on CA Operation | Samsung | imported from 3GU |
R1‑180199 | - | - | - |
R1‑1801990 | Corrections on Rate Matching | Samsung | imported from 3GU |
R1‑1801991 | Performance Evaluation of NR Channel Coding | Samsung | imported from 3GU |
R1‑1801992 | Remaining Issues on Polar Coding | Samsung | imported from 3GU |
R1‑1801993 | Corrections on LTE-NR Coexistence | Samsung | imported from 3GU |
R1‑1801994 | On Delta_TF for PUCCH Power Control | Samsung | imported from 3GU |
R1‑1801995 | On TPC Command Timing | Samsung | imported from 3GU |
R1‑1801996 | Corrections on UL Power Control for CA | Samsung | imported from 3GU |
R1‑1801997 | Corrections on PHR Calculation for CA | Samsung | imported from 3GU |
R1‑1801998 | UE Features | Samsung | imported from 3GU |
R1‑1801999 | Design of CQI tables for URLLC | Samsung | imported from 3GU |
R1‑180200 | - | - | - |
R1‑1802000 | On Need for Additional DCI Format | Samsung | imported from 3GU |
R1‑1802001 | On Need for PDCCH Repetitions | Samsung | imported from 3GU |
R1‑1802002 | Multiplexing of UL Transmissions with Different Reliability Requirements | Samsung | imported from 3GU |
R1‑1802003 | Channel Model for HAPS in NTN | Samsung | imported from 3GU |
R1‑1802004 | PTRS design consideration for NTN | Samsung | imported from 3GU |
R1‑1802005 | Transmitter side signal processing schemes for NOMA | Samsung | imported from 3GU |
R1‑1802006 | Considerations on receiver types for NoMA schemes | Samsung | imported from 3GU |
R1‑1802007 | Procedures related consideration to NOMA | Samsung | imported from 3GU |
R1‑1802008 | Considerations on evaluation for NoMA study | Samsung | imported from 3GU |
R1‑1802009 | Evaluation scenarios for NR V2X | Samsung | imported from 3GU |
R1‑180201 | - | - | - |
R1‑1802010 | Channel model for NR V2X | Samsung | imported from 3GU |
R1‑1802011 | Simulation Methodology for NR-U operation | Samsung | imported from 3GU |
R1‑1802012 | Deployment scenarios for NR-U operation | Samsung | imported from 3GU |
R1‑1802013 | Candidate spectrum for NR-U operation | Samsung | imported from 3GU |
R1‑1802014 | Potential solutions and techniques for NR-U operation | Samsung | imported from 3GU |
R1‑1802015 | Discussion on compact DCI design for URLLC | Spreadtrum Communications | imported from 3GU |
R1‑1802016 | Remaining issues on HARQ-ACK codebook | Spreadtrum Communications | imported from 3GU |
R1‑1802017 | Multiplexing of UL eMBB and URLLC in NR | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1802018 | Control of UE beamforming in RRC_CONNECTED | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1802019 | Draft LS reply on MAC CE for MIMO | Ericsson-LG Co., LTD | imported from 3GU |
R1‑180202 | - | - | - |
R1‑1802020 | NPRACH design aspects for the support of TDD NB-IoT | CEWiT | imported from 3GU |
R1‑1802021 | Remaining details on PRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802022 | Remaining details on RACH procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802023 | Remaining open items on short PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802024 | Remaining open items on long PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802025 | Remaining open items on UCI multiplexing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802026 | Remaining open items on PUCCH resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802027 | Considerations on NOMA transmitter | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802028 | Receiver considerations for UL NOMA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802029 | Essential procedures to be discussed with NOMA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180203 | - | - | - |
R1‑1802030 | Considerations on NOMA evaluation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802031 | Discussion on DL CE Level determination issue in NB-IoT | CMCC | imported from 3GU |
R1‑1802032 | Discussion on PRACH configuration table | CMCC | imported from 3GU |
R1‑1802033 | Discussion on Time period for SSB to RO synchronization | CMCC | imported from 3GU |
R1‑1802034 | Discussion on remaining issues on non-codebook based transmission for UL | CMCC | imported from 3GU |
R1‑1802035 | Discussion on remaining issues on CSI reporting | CMCC | imported from 3GU |
R1‑1802036 | Discussion on priority rules to handle the collision between SRS and PRACH | CMCC | imported from 3GU |
R1‑1802037 | Discussion on remaining issues on CSI-RS configuration | CMCC | imported from 3GU |
R1‑1802038 | Discussion on remaining issues on SRS | CMCC | imported from 3GU |
R1‑1802039 | Discussion on PDCCH DMRS | CMCC | imported from 3GU |
R1‑180204 | - | - | - |
R1‑1802040 | Discussion on remaining issues for search space | CMCC | imported from 3GU |
R1‑1802041 | Discussion on remaining issues for semi-static DL-UL assignment and dynamic SFI | CMCC | imported from 3GU |
R1‑1802042 | Discussion on DCI format design | CMCC | imported from 3GU |
R1‑1802043 | Discussion on remaining issues for time domain resource allocation | CMCC | imported from 3GU |
R1‑1802044 | Discussion on HARQ timing for DL SPS and multi-slots scheduling | CMCC | imported from 3GU |
R1‑1802045 | Discussion on remaining issues for SR and grant-free transmission | CMCC | imported from 3GU |
R1‑1802046 | Discussion on collision handling for UL URLLC transmission | CMCC | imported from 3GU |
R1‑1802047 | Considerations on Rel-15 NoMA usage scenarios, design targets and principles | CMCC | imported from 3GU |
R1‑1802048 | Discussion on LLS Assumption and SLS Evaluation Methodology for NoMA | CMCC | imported from 3GU |
R1‑1802049 | Discussion on evaluation assumption for NR-U | CMCC | imported from 3GU |
R1‑180205 | - | - | - |
R1‑1802050 | Calibration results for ITU self-evaluation | CMCC | imported from 3GU |
R1‑1802051 | Consideration on self-evaluation of IMT-2020 for UL SINR | CMCC | imported from 3GU |
R1‑1802052 | Consideration on self-evaluation of IMT-2020 for antenna modeling | CMCC | imported from 3GU |
R1‑1802053 | Incorrect path loss calculation in TS 38.213 | IAESI | imported from 3GU |
R1‑1802054 | Enhanced Sync Signal for efeMTC | Sony | imported from 3GU |
R1‑1802055 | Consideration in EDT using Message 3 | Sony | imported from 3GU |
R1‑1802056 | Considerations on WUS for efeMTC | Sony | imported from 3GU |
R1‑1802057 | Using Uplink HARQ feedback for early PUSCH repetitions termination | Sony | imported from 3GU |
R1‑1802058 | Remaining issues in CQI table for PDSCH 64QAM | Sony | imported from 3GU |
R1‑1802059 | Remaining issues in sub-PRB transmission | Sony | imported from 3GU |
R1‑180206 | - | - | - |
R1‑1802060 | Flexible PDSCH/PUSCH resource allocation for efeMTC | Sony | imported from 3GU |
R1‑1802061 | Remaining issues on SRS | Sony | imported from 3GU |
R1‑1802062 | TP for termination of the repetition for UL transmission without grant | Sony | imported from 3GU |
R1‑1802063 | Considerations on UL pre-emption in NR | Sony | imported from 3GU |
R1‑1802064 | Considerations on Doppler compensation for LEO-based NTN | Sony | imported from 3GU |
R1‑1802065 | Consideration of the transmitter side signal processing for NOMA | Sony | imported from 3GU |
R1‑1802066 | NR unlicensed design considerations | Sony | imported from 3GU |
R1‑1802067 | On TBS determination procedure | ZTE, Sanechips | imported from 3GU |
R1‑1802068 | On channel coding targeting high reliability | ZTE, Sanechips | imported from 3GU |
R1‑1802069 | NOMA transmitter signature generation and structure | ETRI | imported from 3GU |
R1‑180207 | - | - | - |
R1‑1802070 | NOMA user multiplexing capability and channel characteristics in system level evaluation | ETRI | imported from 3GU |
R1‑1802071 | Remaining Issues for Beam Failure Recovery Procedure | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1802072 | LBT Considering Beamforming in Unlicensed Spectrum | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1802073 | DL multi-TRP/panel operation in R15 | Huawei, HiSilicon | imported from 3GU |
R1‑1802074 | Further enhancements on CSI reporting and codebook design | Huawei, HiSilicon | imported from 3GU |
R1‑1802075 | Clarification on SRS switching among CCs | Huawei, HiSilicon | imported from 3GU |
R1‑1802076 | Discussion on CSI configuration framework | Huawei, HiSilicon | imported from 3GU |
R1‑1802077 | Discussion on Sidelink Mode 4 Supporting for V2X Carrier Aggregation Scheduling | ITRI | imported from 3GU |
R1‑1802078 | Discussion on Synchronization Aspects for Carrier Aggregation in V2X Phase 2 | ITRI | imported from 3GU |
R1‑1802079 | Discussion on Resource Pool Sharing for Mode 3 and Mode 4 V2X | ITRI | imported from 3GU |
R1‑180208 | - | - | - |
R1‑1802080 | Considerations of Latency Reduction for V2X Phase 2 | ITRI | imported from 3GU |
R1‑1802081 | Discussion on CSI-RS based RRM/RLM as a mandatory feature in Rel-15 | Huawei, HiSilicon | imported from 3GU |
R1‑1802082 | Initial Consideration on UMi calibration for user experience data rate in the multi-layer network deployment | ZTE, Sanechips | imported from 3GU |
R1‑1802083 | Initial Consideration on IMT-2020 self evaluation of DL spectral efficiency | ZTE, Sanechips | imported from 3GU |
R1‑1802084 | Link curve performance of LDPC coding in IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1802085 | Some initial consideration on the evaluated parameters and detail for IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1802086 | UL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | ZTE, Sanechips | imported from 3GU |
R1‑1802087 | Discussion on CORESET monitor during BFR procedure | ITRI | imported from 3GU |
R1‑1802088 | Discussion on QCL | ITRI | imported from 3GU |
R1‑1802089 | Discussion on DCI format 0_0/1_0 | ITRI | imported from 3GU |
R1‑180209 | - | - | - |
R1‑1802090 | Calibration results for self evaluation on eMBB | ITRI | imported from 3GU |
R1‑1802091 | Calibration results for self evaluation on mMTC | ITRI | imported from 3GU |
R1‑1802092 | Calibration results for self evaluation on URLLC | ITRI | imported from 3GU |
R1‑1802093 | Dissuasion on URLLC multiplexing | ITRI | imported from 3GU |
R1‑1802094 | Dissuasion on NOMA scenarios | ITRI | imported from 3GU |
R1‑1802095 | Remaining issues on codebook based UL transmission | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802096 | Remaining issues on non-codebook based UL transmission | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802097 | Remaining issues on MIMO related DCI design | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802098 | Remaining issues on RS multiplexing | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802099 | Remaining issues on DMRS | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑180210 | - | - | - |
R1‑1802100 | Remaining issues on SRS | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802101 | Remaining issues on uplink power control | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802102 | Remaining issues on resource allocation for PUCCH | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802103 | Remaining issues on DL/UL resource allocation | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802104 | Other aspects on bandwidth parts | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802105 | Multiplexing of HARQ-ACK and SR | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802106 | Remaining issues on long PUCCH | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802107 | Remaining details on UCI multiplexing | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802108 | Remaining details on HARQ-ACK transmission | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802109 | On remaining issues of NR-eV2X evaluation scenarios | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑180211 | - | - | - |
R1‑1802110 | Mode 4 support in eV2X carrier aggregation | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802111 | Synchronization in eV2X carrier aggregation | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802112 | Transmit diversity scheme in eV2X | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802113 | Resource pool sharing between mode 3 and mode 4 | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802114 | Latency reduction for eV2X | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802115 | Remaining issues on Search Space | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802116 | Remaining issues on GC-PDCCH | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802117 | Discussion on DCI contents | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802118 | Remaining essential issues on grant free | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802119 | Compact DCI for URLLC | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑180212 | - | - | - |
R1‑1802120 | Low-latency transmission for uplink | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802121 | Collision randomization for grant free | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802122 | On deployment scenarios for NR-U operation | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802123 | Considerations on candidate spectrums for NR-U operation | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802124 | Physical layer design for NR unlicensed | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802125 | Channel access mechanisms for NR unlicensed | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802126 | Initial access for NR unlicensed | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802127 | Text Proposal for DL PRB Bundling | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802128 | Text Proposal for Beam Management | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802129 | Text Proposal for Beam Failure Recovery | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑180213 | - | - | - |
R1‑1802130 | Text Proposal for CSI-RS for Time/frequency Tracking | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802131 | Text Proposal for QCL | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802132 | Text Proposal for CA Power Control | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802133 | Discussion on paging design | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802134 | Discussion on synchronization raster indication | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802135 | RMSI PDCCH monitoring window configuration | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802136 | On cell-defining SS/PBCH block | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802137 | Remaining details on NR RRM | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802138 | Remaining details on NR RLM | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802139 | Considerations on the DL power consumption reduction for efeMTC | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑180214 | - | - | - |
R1‑1802140 | On wake-up signal design | Guangdong OPPO Mobile Telecom | imported from 3GU |
R1‑1802141 | Indication of cell-defining SS/PBCH block in PBCH | ETRI | imported from 3GU |
R1‑1802142 | Remaining issues on RMSI delivery | ETRI | imported from 3GU |
R1‑1802143 | Remaining issues on slot format configuration | ETRI | imported from 3GU |
R1‑1802144 | Remaining issues on bandwidth part switching | ETRI | imported from 3GU |
R1‑1802145 | UCI multiplexing of different usage scenario | ETRI | imported from 3GU |
R1‑1802146 | Discussion on beam management in high speed train scenario | ETRI | imported from 3GU |
R1‑1802147 | Discussion on DM-RS in high speed train scenario | ETRI | imported from 3GU |
R1‑1802148 | Correction on sidelink subframe indexing in TS36.213 | LG Electronics | imported from 3GU |
R1‑1802149 | Discussion on subframe indexing issue for partial network coverage | LG Electronics | imported from 3GU |
R1‑180215 | - | - | - |
R1‑1802150 | Text proposal on UL collision of more than 2 UL channels in 36.213 | LG Electronics, Ericsson | imported from 3GU |
R1‑1802151 | Text proposal on UCI mapping onto subslot sPUSCH in 36.212 | LG Electronics | imported from 3GU |
R1‑1802152 | Discussion on multiple starting and ending positions for LAA UL | LG Electronics | imported from 3GU |
R1‑1802153 | Resource allocation and (de)activation for autonomous UL access | LG Electronics | imported from 3GU |
R1‑1802154 | HARQ operation and control signaling for autonomous UL access | LG Electronics | imported from 3GU |
R1‑1802155 | Channel access procedure for autonomous UL access | LG Electronics | imported from 3GU |
R1‑1802156 | Discussion on carrier aggregation in sidelink mode 4 operation | LG Electronics | imported from 3GU |
R1‑1802157 | Discussion on synchronization for sidelink CA | LG Electronics | imported from 3GU |
R1‑1802158 | Discussion on 64QAM support in PC5 operation | LG Electronics | imported from 3GU |
R1‑1802159 | Discussion on resource pool sharing between UEs using mode 3 and 4 | LG Electronics | imported from 3GU |
R1‑180216 | - | - | - |
R1‑1802160 | Discussion on maximum time reduction between packet arrival and selected transmission resource | LG Electronics | imported from 3GU |
R1‑1802161 | System information acquisition time enhancement in MTC | LG Electronics | imported from 3GU |
R1‑1802162 | Data transmission during random access procedure in MTC | LG Electronics | imported from 3GU |
R1‑1802163 | Discussion on wake up signal in MTC | LG Electronics | imported from 3GU |
R1‑1802164 | Discussion on early termination of uplink repetitions for MTC | LG Electronics | imported from 3GU |
R1‑1802165 | Discussion on wake up signal function in NB-IoT | LG Electronics | imported from 3GU |
R1‑1802166 | Discussion on wake up signal configurations and procedures in NB-IoT | LG Electronics | imported from 3GU |
R1‑1802167 | Wake up signal design in NB-IoT | LG Electronics | imported from 3GU |
R1‑1802168 | Data transmission during random access procedure in NB-IoT | LG Electronics | imported from 3GU |
R1‑1802169 | Discussion on Scheduling request in NB-IoT | LG Electronics | imported from 3GU |
R1‑180217 | - | - | - |
R1‑1802170 | Semi-persistent scheduling | LG Electronics | imported from 3GU |
R1‑1802171 | Cell search latency enhancement | LG Electronics | imported from 3GU |
R1‑1802172 | MIB-NB skipping and System information acquisition latency enhancement | LG Electronics | imported from 3GU |
R1‑1802173 | RRM measurement enhancement in NB-IoT | LG Electronics | imported from 3GU |
R1‑1802174 | UL power control enhancement for NB-IoT small cell | LG Electronics | imported from 3GU |
R1‑1802175 | Preamble structure for NPRACH enhancement | LG Electronics | imported from 3GU |
R1‑1802176 | Resource configuration for NPRACH enhancement | LG Electronics | imported from 3GU |
R1‑1802177 | Discussion on DL aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1802178 | Discussion on UL aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑1802179 | Discussion on common aspects in TDD NB-IoT | LG Electronics | imported from 3GU |
R1‑180218 | - | - | - |
R1‑1802180 | Candidate techniques for DL control for LTE URLLC | LG Electronics | imported from 3GU |
R1‑1802181 | PDSCH related techniques for LTE URLLC | LG Electronics | imported from 3GU |
R1‑1802182 | UL control related techniques for LTE URLLC | LG Electronics | imported from 3GU |
R1‑1802183 | PUSCH related techniques for LTE URLLC | LG Electronics | imported from 3GU |
R1‑1802184 | Remaining Details on Synchronization signal | LG Electronics | imported from 3GU |
R1‑1802185 | RACH Procedure | LG Electronics | imported from 3GU |
R1‑1802186 | Remaining Details on L3 measurement and mobility management | LG Electronics | imported from 3GU |
R1‑1802187 | Remaining Details on Radio Link Monitoring in NR | LG Electronics | imported from 3GU |
R1‑1802188 | Remaining Details on PBCH design and contents | LG Electronics | imported from 3GU |
R1‑1802189 | Text proposals on codebook-based UL | LG Electronics | imported from 3GU |
R1‑180219 | - | - | - |
R1‑1802190 | Text proposals on non-codebook-based UL | LG Electronics | imported from 3GU |
R1‑1802191 | RMSI delivery and CORESET configuration | LG Electronics | imported from 3GU |
R1‑1802192 | Discussion on aperiodic CSI report timing and relaxation | LG Electronics | imported from 3GU |
R1‑1802193 | Text proposals for LI reporting | LG Electronics | imported from 3GU |
R1‑1802194 | Clarification on PDCCH beam indication by higher-layers | LG Electronics | imported from 3GU |
R1‑1802195 | Text proposals on UL beam management | LG Electronics | imported from 3GU |
R1‑1802196 | Text proposals on beam failure recovery | LG Electronics | imported from 3GU |
R1‑1802197 | Other system information delivery | LG Electronics | imported from 3GU |
R1‑1802198 | Text proposals on RS multiplexing | LG Electronics | imported from 3GU |
R1‑1802199 | Text proposals on CSI-RS for different purposes | LG Electronics | imported from 3GU |
R1‑180220 | - | - | - |
R1‑1802200 | Remaining issues on DMRS | LG Electronics | imported from 3GU |
R1‑1802201 | Text proposals on UL PT-RS power boosting | LG Electronics | imported from 3GU |
R1‑1802202 | Clarification on intra-slot hopping for aperiodic SRS | LG Electronics | imported from 3GU |
R1‑1802203 | Text proposals on TRS | LG Electronics | imported from 3GU |
R1‑1802204 | Text proposals on QCL configurations for periodic CSI-RS | LG Electronics | imported from 3GU |
R1‑1802205 | Paging design in NR | LG Electronics | imported from 3GU |
R1‑1802206 | Remaining issues on PDCCH structure | LG Electronics | imported from 3GU |
R1‑1802207 | Remaining issues on search space | LG Electronics | imported from 3GU |
R1‑1802208 | Remaining issues on group common PDCCH | LG Electronics | imported from 3GU |
R1‑1802209 | Remaining issues on DCI contents and formats | LG Electronics | imported from 3GU |
R1‑180221 | - | - | - |
R1‑1802210 | Remaining issues on short-duration PUCCH | LG Electronics | imported from 3GU |
R1‑1802211 | Remaining issues on long-duration PUCCH | LG Electronics | imported from 3GU |
R1‑1802212 | Remaining issues on UCI multiplexing | LG Electronics | imported from 3GU |
R1‑1802213 | Remaining issues on PUCCH resource allocation | LG Electronics | imported from 3GU |
R1‑1802214 | Remaining issues on DL/UL scheduling and HARQ | LG Electronics | imported from 3GU |
R1‑1802215 | Remaining issues on UL data transmission procedure | LG Electronics | imported from 3GU |
R1‑1802216 | Remaining issues on bandwidth part operation | LG Electronics | imported from 3GU |
R1‑1802217 | Remaining issues on CA and HARQ-ACK codebook | LG Electronics | imported from 3GU |
R1‑1802218 | Remaining issues on rate matching resources | LG Electronics | imported from 3GU |
R1‑1802219 | Discussion on PRACH preamble format details | LG Electronics | imported from 3GU |
R1‑180222 | - | - | - |
R1‑1802220 | Correction on table-based TBS determination procedure | LG Electronics | imported from 3GU |
R1‑1802221 | Remaining issues on NR LTE coexistence | LG Electronics | imported from 3GU |
R1‑1802222 | Remaining issues on non-CA aspect of UL power control | LG Electronics | imported from 3GU |
R1‑1802223 | Remaining issues on CA aspect of UL power control | LG Electronics | imported from 3GU |
R1‑1802224 | Remaining issues on power sharing for EN-DC | LG Electronics | imported from 3GU |
R1‑1802225 | Discussion on CQI and MCS table for URLLC | LG Electronics | imported from 3GU |
R1‑1802226 | Discussion on compact DCI format design | LG Electronics | imported from 3GU |
R1‑1802227 | Discussion on PDCCH repetition for URLLC | LG Electronics | imported from 3GU |
R1‑1802228 | Discussion on multiplexing UL transmission with different requirements | LG Electronics | imported from 3GU |
R1‑1802229 | Transmitter side signal processing schemes for NCMA | LG Electronics | imported from 3GU |
R1‑180223 | - | - | - |
R1‑1802230 | Considerations on the receiver types and NoMA schemes | LG Electronics | imported from 3GU |
R1‑1802231 | Discussion on procedures related to NOMA | LG Electronics | imported from 3GU |
R1‑1802232 | Link level performance evaluation for NCMA | LG Electronics | imported from 3GU |
R1‑1802233 | Draft TR 37.885 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | LG Electronics | imported from 3GU |
R1‑1802234 | Discussion on evaluation scenarios for new V2X use cases | LG Electronics | imported from 3GU |
R1‑1802235 | Discussion on traffic model and performance metric for new V2X use cases | LG Electronics | imported from 3GU |
R1‑1802236 | Discussion on channel model for new V2X use cases | LG Electronics | imported from 3GU |
R1‑1802237 | Simulation methodology for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1802238 | Deployment scenarios for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑1802239 | Potential solutions for NR unlicensed operation | LG Electronics | imported from 3GU |
R1‑180224 | - | - | - |
R1‑1802240 | Remaining details on RACH timing for NR | ITL | imported from 3GU |
R1‑1802241 | Discussion on CBSR for advanced CSI | LG Electronics Inc. | imported from 3GU |
R1‑1802242 | Calibration results for ITU-2020 self-evaluation | LG Electronics Inc. | imported from 3GU |
R1‑1802243 | On UL multiplexing of transmissions with different reliability | NEC | imported from 3GU |
R1‑1802244 | On evaluation of new V2X use cases | NEC | imported from 3GU |
R1‑1802245 | On eMBB and URLLC Uplink Multiplexing | III | imported from 3GU |
R1‑1802246 | Slot format determination for multi-slot PUCCH | III | imported from 3GU |
R1‑1802247 | Discussion on GC PDCCH | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1802248 | Discussion on preemption indication | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑1802249 | Collision between PRACH transmission and SR transmission | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑180225 | - | - | - |
R1‑1802250 | Low PAPR SFBC for V2X transmit diversity | Mitsubishi Electric RCE | imported from 3GU |
R1‑1802251 | Low PAPR SFBC evaluations for PSSCH | Mitsubishi Electric RCE | imported from 3GU |
R1‑1802252 | Remaining issues on PTRS | Mitsubishi Electric RCE | imported from 3GU |
R1‑1802253 | Reducing system acquisition time for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802254 | Data transmission during random access procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802255 | Wake-up signal for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802256 | Uplink HARQ-ACK feedback in efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802257 | Remaining issue on supporting DL 64QAM for efeMTC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802258 | Design of PUSCH Sub-PRB Allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802259 | Support for flexible PDSCH/PUSCH starting PRB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180226 | - | - | - |
R1‑1802260 | Compact DCI for NR URLLC operation | Sony | imported from 3GU |
R1‑1802261 | Discussion on evaluation scenarios for new V2X use cases in NR | Sony | imported from 3GU |
R1‑1802262 | Functions of wake-up signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802263 | Wake-up signal configurations and procedures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802264 | Multiple starting and ending positions in a subframe for UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802265 | Considerations for design of wake-up signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802266 | Resource Allocation for Autonomous UL Access | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802267 | Data transmission during random access procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802268 | HARQ for Autonomous Uplink Access | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802269 | Design of physical layer scheduling request | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180227 | - | - | - |
R1‑1802270 | On channel access for autonomous UL access | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802271 | Support for semi-persistent scheduling in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802272 | Reducing cell search time for feNB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802273 | Reducing system acquisition time for feNB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802274 | Measurement accuracy improvement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802275 | Small cell support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802276 | NPRACH cell range enhancement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802277 | Companies’ views on deployment scenarios for NR unlicensed operation | Nokia, AT&T, CableLabs, Charter Communications, Comcast, Deutsche Telecom, Ericsson, HiSilicon, Huawei, Intel, InterDigital, Lenovo, LG Electronics, MediaTek, Motorola Mobility, Nokia Shanghai Bell, NTT DOCOMO, Qualcomm, Samsung, Sanechips, Sony, T-Mobile | imported from 3GU |
R1‑1802278 | NPRACH reliability enhancement in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802279 | Downlink aspects of TDD support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180228 | - | - | - |
R1‑1802280 | Uplink aspects of TDD support in NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802281 | Deployment Scenarios and Use Cases for NR Unlicensed Operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802282 | Common Aspects of NB-IoT TDD Operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802283 | Spectrum band candidates for NR unlicensed | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802284 | Simulation methodology and assumptions for NR-U evaluations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802285 | Remaining details for CSI reporting on PUCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802286 | NR-NTN update on Link budget analysis | THALES | imported from 3GU |
R1‑1802287 | NR Unlicensed Considerations | Apple Inc. | imported from 3GU |
R1‑1802288 | Discussion on beam measurement and reporting | Apple Inc. | imported from 3GU |
R1‑1802289 | Discussion on handling of UL multiplexing of transmissions with different reliability | Apple Inc. | imported from 3GU |
R1‑180229 | - | - | - |
R1‑1802290 | Remaining Issues Son PDCCH Search Space | Apple Inc. | imported from 3GU |
R1‑1802291 | Considerations on NR-based Access to Unlicensed Spectrum | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑1802292 | On PHY impact of Rel-15 LTE CA SCell New State agreements | Qualcomm Incorporated | imported from 3GU |
R1‑1802293 | Draft response to LS about LTE CA SCell New State agreements | Qualcomm Incorporated | imported from 3GU |
R1‑1802294 | SPS for eMTC | Qualcomm Incorporated | imported from 3GU |
R1‑1802295 | Discussion on multiple CSI reports for eCA | Qualcomm Incorporated | imported from 3GU |
R1‑1802296 | Correction to determination of number of PUCCH repetitions for BL/CE UE | Qualcomm Incorporated | imported from 3GU |
R1‑1802297 | Clarification on CSI measurement for FD-MIMO in TM9 | Qualcomm Incorporated | imported from 3GU |
R1‑1802298 | Correction on CSI reporting for Class B K=1 | Qualcomm Incorporated | imported from 3GU |
R1‑1802299 | Correction on CSI reporting for Class B K>1 | Qualcomm Incorporated | imported from 3GU |
R1‑180230 | - | - | - |
R1‑1802300 | On NPRS performance | Qualcomm Incorporated | imported from 3GU |
R1‑1802301 | Interference randomization in CSS | Qualcomm Incorporated | imported from 3GU |
R1‑1802302 | Correction to timing advance for BL/CE UEs | Qualcomm Incorporated | imported from 3GU |
R1‑1802303 | UCI multiplexing for eVoLTE | Qualcomm Incorporated | imported from 3GU |
R1‑1802304 | Corrections for antenna switching | Qualcomm Incorporated | imported from 3GU |
R1‑1802305 | SRS antenna switching for 1T4R and 2T4R | Qualcomm Incorporated | imported from 3GU |
R1‑1802306 | Discussion on modulation enhancements | Qualcomm Incorporated | imported from 3GU |
R1‑1802307 | Handling of multiple numerologies in FeMBMS | Qualcomm Incorporated | imported from 3GU |
R1‑1802308 | Aspects related to interaction between different TTI lengths | Qualcomm Incorporated | imported from 3GU |
R1‑1802309 | Aspects related to DL control channel | Qualcomm Incorporated | imported from 3GU |
R1‑180231 | - | - | - |
R1‑1802310 | Aspects related to UL control channel | Qualcomm Incorporated | imported from 3GU |
R1‑1802311 | Aspects related to DL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑1802312 | Aspects related to UL data channel | Qualcomm Incorporated | imported from 3GU |
R1‑1802313 | Aspects related to sTTI SPS operation | Qualcomm Incorporated | imported from 3GU |
R1‑1802314 | Remaining details of resource allocation for AUL | Qualcomm Incorporated | imported from 3GU |
R1‑1802315 | Remaining details of HARQ for AUL | Qualcomm Incorporated | imported from 3GU |
R1‑1802316 | Remaining details of channel access and CW update procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1802317 | Mode 4 support with V2X PC5 Carrier Aggregation | Qualcomm Incorporated | imported from 3GU |
R1‑1802318 | Synchronization for V2X PC5 Carrier Aggregation | Qualcomm Incorporated | imported from 3GU |
R1‑1802319 | Support of 64-QAM for V2X Phase 2 | Qualcomm Incorporated | imported from 3GU |
R1‑180232 | - | - | - |
R1‑1802320 | Transmit Diversity for V2X Phase 2 | Qualcomm Incorporated | imported from 3GU |
R1‑1802321 | Resource pool sharing between Mode 3 and Mode 4 | Qualcomm Incorporated | imported from 3GU |
R1‑1802322 | Reduction of time between packet arrival and transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1802323 | Remaining issues for introduction of 1024QAM | Qualcomm Incorporated | imported from 3GU |
R1‑1802324 | Reduced system acquisition time | Qualcomm Incorporated | imported from 3GU |
R1‑1802325 | Physical layer aspects of early data transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1802326 | Efficient monitoring of DL control channels | Qualcomm Incorporated | imported from 3GU |
R1‑1802327 | Uplink HARQ-ACK feedback | Qualcomm Incorporated | imported from 3GU |
R1‑1802328 | CQI table for 64-QAM | Qualcomm Incorporated | imported from 3GU |
R1‑1802329 | Sub-PRB allocation for eFeMTC | Qualcomm Incorporated | imported from 3GU |
R1‑180233 | - | - | - |
R1‑1802330 | Flexible allocation for PDSCH and PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑1802331 | Wake-up signal functions | Qualcomm Incorporated | imported from 3GU |
R1‑1802332 | Wake-up signal configurations and procedures | Qualcomm Incorporated | imported from 3GU |
R1‑1802333 | Wake-up signal design | Qualcomm Incorporated | imported from 3GU |
R1‑1802334 | Physical layer aspects of data transmission during random access procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1802335 | Physical layer scheduling request | Qualcomm Incorporated | imported from 3GU |
R1‑1802336 | Support of SPS | Qualcomm Incorporated | imported from 3GU |
R1‑1802337 | Enhancements to cell search | Qualcomm Incorporated | imported from 3GU |
R1‑1802338 | Enhancements to system information acquisiton | Qualcomm Incorporated | imported from 3GU |
R1‑1802339 | Improvement of PHY measurements | Qualcomm Incorporated | imported from 3GU |
R1‑180234 | - | - | - |
R1‑1802340 | Support of small cells | Qualcomm Incorporated | imported from 3GU |
R1‑1802341 | NPRACH support for large cell access | Qualcomm Incorporated | imported from 3GU |
R1‑1802342 | NPRACH Reliability Enhancement | Qualcomm Incorporated | imported from 3GU |
R1‑1802343 | Downlink aspects of TDD | Qualcomm Incorporated | imported from 3GU |
R1‑1802344 | Uplink aspects of TDD | Qualcomm Incorporated | imported from 3GU |
R1‑1802345 | General considerations on TDD design | Qualcomm Incorporated | imported from 3GU |
R1‑1802346 | Coexistence with NR | Qualcomm Incorporated | imported from 3GU |
R1‑1802347 | Phyiscal layer impact of enhancements to RRC Connection Release | Qualcomm Incorporated | imported from 3GU |
R1‑1802348 | Remaining details of evaluations | Qualcomm Incorporated | imported from 3GU |
R1‑1802349 | DL control related techniques for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑180235 | - | - | - |
R1‑1802350 | PDSCH related techniques for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1802351 | UL control related techniques for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1802352 | PUSCH related techniques for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1802353 | Soft buffer partitioning in EN-DC | NEC | imported from 3GU |
R1‑1802354 | TP on signal generation | NEC | imported from 3GU |
R1‑1802355 | PT-RS design | Panasonic Corporation | imported from 3GU |
R1‑1802356 | Clarification on PUSCH and PDSCH scrambling for BL/CE UEs | Intel Corporation | imported from 3GU |
R1‑1802357 | Correction on higher layer parameter schedulingInfoSIB1-BR-r13 | Intel Corporation | imported from 3GU |
R1‑1802358 | On DMRS sharing for subslot sPDSCH | Intel Corporation | imported from 3GU |
R1‑1802359 | Remaining details on uplink starting and ending positions in a subframe for FS3 | Intel Corporation | imported from 3GU |
R1‑180236 | - | - | - |
R1‑1802360 | Remaining Details for Resource Allocation for Autonomous Uplink Transmissions | Intel Corporation | imported from 3GU |
R1‑1802361 | Remaining Details for HARQ for Autonomous Uplink Transmissions | Intel Corporation | imported from 3GU |
R1‑1802362 | Summary of email discussion [91-LTE-03] on channel access for AUL | Intel Corporation | imported from 3GU |
R1‑1802363 | Remaining Details for Channel access mechanism for autonomous Uplink transmission | Intel Corporation | imported from 3GU |
R1‑1802364 | Remaining physical layer aspects of sidelink carrier aggregation for mode-4 LTE V2V communication | Intel Corporation | imported from 3GU |
R1‑1802365 | Remaining synchronization details for LTE V2V sidelink carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1802366 | On demodulation enhancements for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑1802367 | On support of transmit diversity schemes for LTE V2V sidelink communication | Intel Corporation, Qualcomm Incorporated | imported from 3GU |
R1‑1802368 | Sidelink resource pool sharing for eNB-controlled and UE-autonomous V2V transmission modes | Intel Corporation | imported from 3GU |
R1‑1802369 | Resource selection latency reduction for LTE V2V sidelink communication | Intel Corporation | imported from 3GU |
R1‑180237 | - | - | - |
R1‑1802370 | Remaining issues of 1024QAM support | Intel Corporation | imported from 3GU |
R1‑1802371 | System acquisition time reduction for efeMTC | Intel Corporation | imported from 3GU |
R1‑1802372 | Early data transmission for efeMTC | Intel Corporation | imported from 3GU |
R1‑1802373 | Power saving signal for efeMTC | Intel Corporation | imported from 3GU |
R1‑1802374 | HARQ-ACK feedback for efeMTC UL transmission | Intel Corporation | imported from 3GU |
R1‑1802375 | Design of sub-PRB PUSCH for efeMTC | Intel Corporation | imported from 3GU |
R1‑1802376 | The function scope of wake-up signal for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802377 | Configurations of wake-up signal for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802378 | Early data transmission for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802379 | Scheduling request for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑180238 | - | - | - |
R1‑1802380 | System information acquisition time reduction for feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802381 | Remaining details of SS/PBCH block | Intel Corporation | imported from 3GU |
R1‑1802382 | Remaining details of NR-PBCH | Intel Corporation | imported from 3GU |
R1‑1802383 | Remaining details of RMSI | Intel Corporation | imported from 3GU |
R1‑1802384 | Remaining details of OSI | Intel Corporation | imported from 3GU |
R1‑1802385 | NR Paging Design | Intel Corporation | imported from 3GU |
R1‑1802386 | NR PRACH formats | Intel Corporation | imported from 3GU |
R1‑1802387 | NR RACH procedures | Intel Corporation | imported from 3GU |
R1‑1802388 | Remaining details of RRM measurements | Intel Corporation | imported from 3GU |
R1‑1802389 | Remaining details of RLM | Intel Corporation | imported from 3GU |
R1‑180239 | - | - | - |
R1‑1802390 | On VRB to PRB interleaving | Intel Corporation | imported from 3GU |
R1‑1802391 | On Codebook based transmission for UL | Intel Corporation | imported from 3GU |
R1‑1802392 | On non-codebook based transmission for UL | Intel Corporation | imported from 3GU |
R1‑1802393 | On beam management issues for multi-CC operation | Intel Corporation | imported from 3GU |
R1‑1802394 | Remaining issues on interference measurement for CSI | Intel Corporation | imported from 3GU |
R1‑1802395 | Remaining issues on CSI reporting | Intel Corporation | imported from 3GU |
R1‑1802396 | Remaining Issues on beam management | Intel Corporation | imported from 3GU |
R1‑1802397 | Remaining Issues on beam failure recovery | Intel Corporation | imported from 3GU |
R1‑1802398 | Corrections to CQI definition in NR | Intel Corporation | imported from 3GU |
R1‑1802399 | On multiplexing of PDSCH | Intel Corporation | imported from 3GU |
R1‑180240 | - | - | - |
R1‑1802400 | Remaining issues on CSI-RS | Intel Corporation | imported from 3GU |
R1‑1802401 | Remaining issues on DM-RS | Intel Corporation | imported from 3GU |
R1‑1802402 | Remaining issues On PT-RS | Intel Corporation | imported from 3GU |
R1‑1802403 | Remaining issues on SRS | Intel Corporation | imported from 3GU |
R1‑1802404 | Remaining Issues On TRS | Intel Corporation | imported from 3GU |
R1‑1802405 | Corrections to QCL for NR | Intel Corporation | imported from 3GU |
R1‑1802406 | Some remaining aspects on PDCCH structure | Intel Corporation | imported from 3GU |
R1‑1802407 | Remaining details of PDCCH search spaces and CORESETs | Intel Corporation | imported from 3GU |
R1‑1802408 | Remaining details on GC PDCCH | Intel Corporation | imported from 3GU |
R1‑1802409 | Remaining issues on PDCCH formats and contents | Intel Corporation | imported from 3GU |
R1‑180241 | - | - | - |
R1‑1802410 | PUCCH-PUCCH collision handling | Intel Corporation | imported from 3GU |
R1‑1802411 | PUCCH and PUSCH collision handling | Intel Corporation | imported from 3GU |
R1‑1802412 | UCI on PUSCH | Intel Corporation | imported from 3GU |
R1‑1802413 | Resource allocation before RRC connection | Intel Corporation | imported from 3GU |
R1‑1802414 | Remaining details on DL/UL resource allocation | Intel Corporation | imported from 3GU |
R1‑1802415 | Remaining details on UE processing times and HARQ operation | Intel Corporation | imported from 3GU |
R1‑1802416 | Remaining issues of UL transmission procedures | Intel Corporation | imported from 3GU |
R1‑1802417 | Remaining issues of interrupted transmission indication | Intel Corporation | imported from 3GU |
R1‑1802418 | Remaining issues on carrier aggregation | Intel Corporation | imported from 3GU |
R1‑1802419 | Further consideration on NR-LTE co-existence | Intel Corporation | imported from 3GU |
R1‑180242 | - | - | - |
R1‑1802420 | On Power Contol framework | Intel Corporation | imported from 3GU |
R1‑1802421 | CQI and MCS tables for NR URLLC | Intel Corporation | imported from 3GU |
R1‑1802422 | On compact DCI format for NR URLLC | Intel Corporation | imported from 3GU |
R1‑1802423 | On NR PDCCH repetitions for URLLC | Intel Corporation | imported from 3GU |
R1‑1802424 | Handling UL transmissions with different reliability requirements | Intel Corporation | imported from 3GU |
R1‑1802425 | NOMA transmission scheme: LCRS | Intel Corporation | imported from 3GU |
R1‑1802426 | Receiver structure for NOMA | Intel Corporation | imported from 3GU |
R1‑1802427 | NOMA related procedure | Intel Corporation | imported from 3GU |
R1‑1802428 | Evaluation methodology for NOMA study | Intel Corporation | imported from 3GU |
R1‑1802429 | On scenarios, traffic models and performance metrics for eV2X evaluations | Intel Corporation | imported from 3GU |
R1‑180243 | - | - | - |
R1‑1802430 | On channel models for eV2X evaluation methodology | Intel Corporation | imported from 3GU |
R1‑1802431 | Thoughts for NR-unlicensed coexistence evaluation | Intel Corporation | imported from 3GU |
R1‑1802432 | On the NR-unlicensed deployment scenarios | Intel Corporation | imported from 3GU |
R1‑1802433 | Companies’ views on candidate spectrum for NR unlicensed operation | Intel Corporation, Sony, AT&T, Nokia, Nokia Shanghai Bell, Ericsson, Charter Communications, Qualcomm Incorporated, ZTE, Sanechips, LG Electronics, Motorola Mobility, Lenovo, InterDigital, Huawei, HiSilicon, Samsung, Verizon, MediaTek Inc., Comcast, Cable | imported from 3GU |
R1‑1802434 | Necessary considerations in designing NR-unlicensed technology | Intel Corporation | imported from 3GU |
R1‑1802435 | On the IMT-2020 self-evaluation ^^performance metrics and evaluation methods | Intel Corporation | imported from 3GU |
R1‑1802436 | On the features, assumptions, and parameters for IMT-2020 self-evaluation | Intel Corporation | imported from 3GU |
R1‑1802437 | Initial calibration results for IMT-2020 self-evaluation | Intel Corporation | imported from 3GU |
R1‑1802438 | Discussion on L1 data rate | Intel Corporation | imported from 3GU |
R1‑1802439 | DRAFT Reply LS on formula or table for L1 data rate | Intel Corporation | imported from 3GU |
R1‑180244 | - | - | - |
R1‑1802440 | On UE features | Intel Corporation | imported from 3GU |
R1‑1802441 | Discussion on HARQ-ACK transmission due to BWP switching | Panasonic | imported from 3GU |
R1‑1802442 | Discussion on resource pool sharing between UEs in mode 3 and UEs in mode 4 | Panasonic | imported from 3GU |
R1‑1802443 | Discussion on resource selection in mode 4 CA | Panasonic | imported from 3GU |
R1‑1802444 | Introducing sTTI to V2X mode 3 | Panasonic | imported from 3GU |
R1‑1802445 | DCI format for URLLC | China Telecommunications | imported from 3GU |
R1‑1802446 | Discussion on the RSRP calculation | China Telecommunications | imported from 3GU |
R1‑1802447 | Clarification on the hopping parameter for PUSCH transmission corresponding to the RAR grant | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802448 | Clarification on the NPRACH starting subcarrier partitioning for multi-tone Msg3 transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802449 | On carrier aggregation using mode 4 resource selection | NTT DOCOMO, INC. | imported from 3GU |
R1‑180245 | - | - | - |
R1‑1802450 | Transmission diversity solutions | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802451 | Resource pool sharing between Mode-3 UEs and Mode-4 Ues | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802452 | Reducing the maximum time between packet arrival and selected resource for data transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802453 | Views on early data transmission in efeMTC_clear | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802454 | Views on UL HARQ-ACK feedback design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802455 | Views on SPS activation and deactivation mechanism resubmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802456 | Evaluation assumption for V2X phase 3 | NTT DOCOMO, INC., TOYOTA InfoTechnology Center | imported from 3GU |
R1‑1802457 | Evaluations for Optimizing Tilting Angles for ITU IMT-2020 Self-Evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802458 | Preliminary evaluation results of dense urban-eMBB performance for ITU IMT-2020 self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802459 | Preliminary Evaluation Results of Rural-eMBB Performance for ITU IMT-2020 Self-evaluation | NTT DOCOMO, INC. | imported from 3GU |
R1‑180246 | - | - | - |
R1‑1802460 | Remaining issues on Synchronization signal | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802461 | Remaining issues on NR-PBCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802462 | Remaining issues on RMSI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802463 | Remaining issues on Paging design | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802464 | Remaining issues on PRACH formats | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802465 | Remaining issues on RACH procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802466 | Remaining issues on Measurement for mobility management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802467 | Remaining issues on RLM for mobility management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802468 | Remaining issue on UL codebook based transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802469 | Remaining issue on UL non-codebook based transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑180247 | - | - | - |
R1‑1802470 | Remaining Issues on CSI reporting | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802471 | Remining Issues on Beam Management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802472 | Remaining issues on beam recovery | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802473 | On Type II codebook enhancement | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802474 | Remaining details on RS multiplexing | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802475 | Remaining details on CSI-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802476 | Remaining details on DM-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802477 | Remaining details on PT-RS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802478 | Remaining details on TRS | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802479 | PDCCH structure | NTT DOCOMO, INC. | imported from 3GU |
R1‑180248 | - | - | - |
R1‑1802480 | Search space | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802481 | Remaining issues on group-common PDCCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802482 | DCI contents and formats | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802483 | PUCCH structure in short-duration | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802484 | PUCCH structure in long-duration | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802485 | Resource allocation for PUCCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802486 | TBS determination | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802487 | DL/UL scheduling and HARQ management | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802488 | UL data transmission procedure | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802489 | Soft-buffer management for NR | NTT DOCOMO, INC. | imported from 3GU |
R1‑180249 | - | - | - |
R1‑1802490 | Multiplexing data with different transmission durations | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802491 | TBS determination | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802492 | Remaining issue on PHR | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802493 | Remaining issues on NR UE features | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802494 | Necessity of compact DCI | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802495 | Necessity of PDCCH repetition | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802496 | Handling UL multiplexing of transmissions with different reliability requirements | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802497 | NOMA scheme with user grouping | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802498 | Receiver candidate for uplink NOMA transmission | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802499 | Initial views on procedures related to NOMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑180250 | - | - | - |
R1‑1802500 | Discussion on performance comparison for NOMA | NTT DOCOMO, INC. | imported from 3GU |
R1‑1802501 | Calibration results on self evaluation for Indoor Hotspot-eMBB | China Telecommunications | imported from 3GU |
R1‑1802502 | Calibration results on self evaluation for Dense Urban-eMBB | China Telecommunications | imported from 3GU |
R1‑1802503 | Calibration results on self evaluation for Rural-eMBB | China Telecommunications | imported from 3GU |
R1‑1802504 | PDCCH mapping to physical resources | Panasonic | imported from 3GU |
R1‑1802505 | Channel estimation complexity and search space | Panasonic | imported from 3GU |
R1‑1802506 | DCI size alignment in CSS | Panasonic | imported from 3GU |
R1‑1802507 | DCI field interpretation when active BWP is changed | Panasonic | imported from 3GU |
R1‑1802508 | UL data transmission procedure | Panasonic | imported from 3GU |
R1‑1802509 | Resource reservation for NR DL | Panasonic | imported from 3GU |
R1‑180251 | - | - | - |
R1‑1802510 | Discussion on partial overlap between HARQ-ACK and SR | Panasonic Corporation | imported from 3GU |
R1‑1802511 | Discussion on PUCCH base sequence hopping | Panasonic Corporation | imported from 3GU |
R1‑1802512 | Discussion on partial overlap between PUCCH and PUSCH | Panasonic Corporation | imported from 3GU |
R1‑1802513 | Discussion on remaining issues on PUCCH resource allocation | Panasonic Corporation | imported from 3GU |
R1‑1802514 | Alignment of synchronization configuration and pre-configuration | Ericsson | imported from 3GU |
R1‑1802515 | On Mode-4 CA aspects | Ericsson | imported from 3GU |
R1‑1802516 | On Synchronization Aspects for PC5 CA | Ericsson | imported from 3GU |
R1‑1802517 | Spectrum considerations for PC5 carrier aggregation | Ericsson | imported from 3GU |
R1‑1802518 | Supporting 64QAM on PC5 | Ericsson | imported from 3GU |
R1‑1802519 | Transmit diversity solutions for Rel-15 PSCCH and PSSCH transmissions | Ericsson | imported from 3GU |
R1‑180252 | - | - | - |
R1‑1802520 | Evaluation of transmit diversity for V2X | Ericsson | imported from 3GU |
R1‑1802521 | DMRS design for two port PSSCH transmission | Ericsson | imported from 3GU |
R1‑1802522 | Resource pool sharing between mode 3 and mode 4 UEs | Ericsson | imported from 3GU |
R1‑1802523 | Reducing time-to-transmit for V2X | Ericsson | imported from 3GU |
R1‑1802524 | Simulation scenarios and performance metrics for V2X | Ericsson | imported from 3GU |
R1‑1802525 | On channel models for eV2X evaluation | Ericsson | imported from 3GU |
R1‑1802526 | Potential solutions and techniques for NR unlicensed | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802527 | On early RSRQ report in Msg3 for NB-IoT | Ericsson LM | imported from 3GU |
R1‑1802528 | Clarification on UL power control for NB-IoT | Beijing Xiaomi Mobile Software | imported from 3GU |
R1‑1802529 | IMT-2020 self-evaluation: mMTC connection density for LTE-MTC and NB-IoT | Ericsson LM | imported from 3GU |
R1‑180253 | - | - | - |
R1‑1802530 | UE behaviour when direction confliction between UL GF and dynamic SFI | Xiaomi Communications | imported from 3GU |
R1‑1802531 | Remaining issues on multiple starting and ending points for LAA UL | Ericsson Japan K.K. | imported from 3GU |
R1‑1802532 | on AUL Configuration and Activation | Ericsson Japan K.K. | imported from 3GU |
R1‑1802533 | on AUL Channel Access | Ericsson Japan K.K. | imported from 3GU |
R1‑1802534 | On PDCCH repetition for NR URLLC | Sequans Communications | imported from 3GU |
R1‑1802535 | AUL signaling and HARQ operation | Ericsson Japan K.K. | imported from 3GU |
R1‑1802536 | Remaining details on PDCCH structure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802537 | On NR operation under PDCCH channel estimation and BD limits | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802538 | Remaining details on search space | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802539 | On remaining details on BWPs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180254 | - | - | - |
R1‑1802540 | Remaining aspects of NR CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802541 | Remaining details on rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802542 | TP for single-PDCCH NCJT in rel-15 | Huawei, HiSilicon | imported from 3GU |
R1‑1802543 | Suburban environment channel characteristics and path loss for NTN | Nokia | imported from 3GU |
R1‑1802544 | Remaining issues on UE behaviours related to slot configuration in TS 38.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802545 | On the alignment of DCI format sizes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802546 | Remaining details of CQI and MCS for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802547 | Discussion on compact DCI for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802548 | Reliability enhancement for PDCCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802549 | On UL multiplexing between eMBB and URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180255 | - | - | - |
R1‑1802550 | Simultaneous configuration of grant and grant-free based UL transmission for URLLC UEs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802551 | UE antenna assumption and beam modeling for NTN | Nokia | imported from 3GU |
R1‑1802552 | Introduction of shortened processing time and shortened TTI into 36.201 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802553 | Remaining issues on UL codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802554 | Remaining issues on non-codebook based UL-MIMO transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802555 | Remaining Details on the CSI Framework | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802556 | Beam Indication for NR-PUSCH | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802557 | Remaining Details on Beam Recovery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802558 | Remaining details of CQI and MCS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802559 | Remaining issues on CSI-RS design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180256 | - | - | - |
R1‑1802560 | Further comments on DM-RS for NR physical data channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802561 | Further comments on PT-RS | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802562 | Remaining Details on Beam Measurement and Reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802563 | Remaining details of TRS design | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802564 | TP on QCL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802565 | Miscellaneous needed changes to shorter TTI in 36.211 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802566 | DRAFT Reply LS on Raster Configuration | Intel Corporation | imported from 3GU |
R1‑1802567 | On beam management with beam correspondence and emission safety | Intel Corporation | imported from 3GU |
R1‑1802568 | DL control channel enhancements for LTE URLLC | Intel Corporation | imported from 3GU |
R1‑1802569 | DL shared channel enhancements for LTE URLLC | Intel Corporation | imported from 3GU |
R1‑180257 | - | - | - |
R1‑1802570 | RACH procedure on SUL | InterDigital, Inc. | imported from 3GU |
R1‑1802571 | L1 activation/deactivation for Grant Free type 2 and DL SPS transmission | InterDigital, Inc. | imported from 3GU |
R1‑1802572 | BWP switching triggering CSI report and cross BWP scheduling | InterDigital, Inc. | imported from 3GU |
R1‑1802573 | Remaining issues on HARQ-ACK codebook | InterDigital, Inc. | imported from 3GU |
R1‑1802574 | Power Control for NR DC | InterDigital, Inc. | imported from 3GU |
R1‑1802575 | CQI and MCS tables for URLLC | InterDigital, Inc. | imported from 3GU |
R1‑1802576 | PDCCH repetition | InterDigital, Inc. | imported from 3GU |
R1‑1802577 | Transmission of UCI with different reliability requirements | InterDigital, Inc. | imported from 3GU |
R1‑1802578 | Power Control for Transmissions with Different Service Requirements | InterDigital, Inc. | imported from 3GU |
R1‑1802579 | Mode 4 support for V2X carrier aggregation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180258 | - | - | - |
R1‑1802580 | Discussion on synchronization for SL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802581 | Tx power allocation in SL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802582 | Support of 64QAM for LTE V2X sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802583 | Discussions on Transmit diversity schemes for V2X sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802584 | Evaluations of transmit diversity schemes for V2X sidelink | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802585 | On Resource pool sharing between mode-3 and mode-4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802586 | Discussion on latency reduction for eV2X | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802587 | Evaluation scenarios of new V2X use cases | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802588 | Remaining details of CSI-RS for RRM configuration | AT&T | imported from 3GU |
R1‑1802589 | Impact of beam failure and recovery on RLM procedures | AT&T | imported from 3GU |
R1‑180259 | - | - | - |
R1‑1802590 | On MIMO Symbol Level Interleaver for PDSCH/PUSCH with CP-OFDM | AT&T | imported from 3GU |
R1‑1802591 | Remaining issues in MIMO CQI Reporting | AT&T | imported from 3GU |
R1‑1802592 | Remaining details on CSI report | AT&T | imported from 3GU |
R1‑1802593 | In support of partial beam failure | AT&T | imported from 3GU |
R1‑1802594 | Remaining issues CQI and MCS selection | AT&T | imported from 3GU |
R1‑1802595 | Remaining issues in CSI-RS | AT&T | imported from 3GU |
R1‑1802596 | Remaining issues in DMRS | AT&T | imported from 3GU |
R1‑1802597 | Remaining issues in DCI contents and formats | AT&T | imported from 3GU |
R1‑1802598 | Resource allocation for PUCCH with Multi slot operation | AT&T | imported from 3GU |
R1‑1802599 | Remaining issues in DL/UL resource allocation | AT&T | imported from 3GU |
R1‑180260 | - | - | - |
R1‑1802600 | Nested HARQ bundling and Multiplexing For Peak Data rates in NR | AT&T | imported from 3GU |
R1‑1802601 | Rate matching aspects for NR standalone operation | AT&T | imported from 3GU |
R1‑1802602 | On mandatory and optional UE features | AT&T | imported from 3GU |
R1‑1802603 | CQI/MCS selection for URLLC | AT&T | imported from 3GU |
R1‑1802604 | A compact DCI format for NR URLLC | AT&T | imported from 3GU |
R1‑1802605 | A Low Complexity MAP receiver for NOMA System | AT&T | imported from 3GU |
R1‑1802606 | Link level simulation assumption for NOMA evaluations | AT&T | imported from 3GU |
R1‑1802607 | Evaluation Scenarios for NR V2X | AT&T | imported from 3GU |
R1‑1802608 | Channel Model consideration for NR V2X | AT&T | imported from 3GU |
R1‑1802609 | Co-Existence Simulation Assumption and Methodology for NR in unlicensed band | AT&T | imported from 3GU |
R1‑180261 | - | - | - |
R1‑1802610 | Use cases and Scenarios for NR in Unlicensed Band | AT&T | imported from 3GU |
R1‑1802611 | Closed Loop "Listen Before Talk" for license assisted NR unlicensed | AT&T | imported from 3GU |
R1‑1802612 | Channel Model for IAB | AT&T | imported from 3GU |
R1‑1802613 | NTN NR impacts on the HARQ Operation | Fraunhofer IIS | imported from 3GU |
R1‑1802614 | Remaining Details on NR-PBCH | InterDigital, Inc. | imported from 3GU |
R1‑1802615 | Remaining Details on Paging | InterDigital, Inc. | imported from 3GU |
R1‑1802616 | Remaining Details on Physical Random Access Channel | InterDigital, Inc. | imported from 3GU |
R1‑1802617 | UE Coherency for Non-CB UL Transmission | InterDigital, Inc. | imported from 3GU |
R1‑1802618 | Remaining issues on CSI reporting | InterDigital, Inc. | imported from 3GU |
R1‑1802619 | Remaining issues on beam failure recovery | InterDigital, Inc. | imported from 3GU |
R1‑180262 | - | - | - |
R1‑1802620 | Remaining issues on beam management | InterDigital, Inc. | imported from 3GU |
R1‑1802621 | Remaining issues on PTRS | InterDigital, Inc. | imported from 3GU |
R1‑1802622 | On remaining issues of search space | InterDigital, Inc. | imported from 3GU |
R1‑1802623 | Simplification of Sets of LDPC Lifting Sizes | InterDigital, Inc. | imported from 3GU |
R1‑1802624 | UE Supporting a Single Base Graph | InterDigital, Inc. | imported from 3GU |
R1‑1802625 | Considerations of URLLC Data Channel Coding | InterDigital, Inc. | imported from 3GU |
R1‑1802626 | CA Power Sharing with Mixed Numerology | InterDigital, Inc. | imported from 3GU |
R1‑1802627 | On eMBB and URLLC multiplexing in UL | InterDigital, Inc. | imported from 3GU |
R1‑1802628 | On explicit HARQ feedback in DL for URLLC | InterDigital, Inc. | imported from 3GU |
R1‑1802629 | Modeling of atmospheric gas loss for NTN channel model | InterDigital, Inc. | imported from 3GU |
R1‑180263 | - | - | - |
R1‑1802630 | Impact of Ionospheric and Tropospheric Scintillation on NTN Channel Model | InterDigital, Inc. | imported from 3GU |
R1‑1802631 | Considerations on HARQ Management for Non-Terrestrial Networks | InterDigital, Inc. | imported from 3GU |
R1‑1802632 | Considerations on Random Access for Non-Terrestrial Networks | InterDigital, Inc. | imported from 3GU |
R1‑1802633 | On IDMA Transmitter Processing | InterDigital, Inc. | imported from 3GU |
R1‑1802634 | On IDMA Receiver Processing | InterDigital, Inc. | imported from 3GU |
R1‑1802635 | Considerations on Procedures Related to Non-orthogonal Multiple Access | InterDigital, Inc. | imported from 3GU |
R1‑1802636 | Considerations on Non-orthogonal Multiple Access Operations | InterDigital, Inc. | imported from 3GU |
R1‑1802637 | On Link Level Evaluation Assumptions for NOMA | InterDigital, Inc. | imported from 3GU |
R1‑1802638 | On System Level Evaluation Assumptions for NOMA | InterDigital, Inc. | imported from 3GU |
R1‑1802639 | Preliminary IDMA link level simulation results | InterDigital, Inc. | imported from 3GU |
R1‑180264 | - | - | - |
R1‑1802640 | Views on V2X Evaluation Scenarios | InterDigital, Inc. | imported from 3GU |
R1‑1802641 | Vehicle Blockage in V2X Sidelink Channel Model | InterDigital, Inc. | imported from 3GU |
R1‑1802642 | Discussion on Simulation Methodology for NR Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑1802643 | Views on NR-Unlicensed Deployment Scenarios | InterDigital, Inc. | imported from 3GU |
R1‑1802644 | Views on Candidate Spectrum for NR Unlicensed Operation | InterDigital, Inc. | imported from 3GU |
R1‑1802645 | Proposals for NR Operation in Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1802646 | Discussion on Potential Waveform Solutions for NR Unlicensed | InterDigital, Inc. | imported from 3GU |
R1‑1802647 | Considerations on Synchronization Signal for NR Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1802648 | Considerations on Random Access for NR Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1802649 | PUCCH Design for NR Operation in Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑180265 | - | - | - |
R1‑1802650 | Coexistence and Channel Access for NR in Unlicensed Spectrum | InterDigital, Inc. | imported from 3GU |
R1‑1802651 | Discussion on LBT in Unlicensed Higher Frequency Bands | InterDigital, Inc. | imported from 3GU |
R1‑1802652 | Data Scheduling and HARQ for NR Operation in Unlicensed Bands | InterDigital, Inc. | imported from 3GU |
R1‑1802653 | Remaining issues on beam failure recovery | InterDigital, Inc. | imported from 3GU |
R1‑1802654 | TDD NB-IoT coexistence with NR | SoftBank Corp. | imported from 3GU |
R1‑1802655 | Discussions on DMRS | Mitsubishi Electric Co. | imported from 3GU |
R1‑1802656 | Discussions on SRS | Mitsubishi Electric Co. | imported from 3GU |
R1‑1802657 | Discussions on UL multiplexing of transmissions with different reliability requirements | Mitsubishi Electric Co. | imported from 3GU |
R1‑1802658 | Clarification on shorten processing time for 1ms TTI | Sharp | imported from 3GU |
R1‑1802659 | Remaining issues for sub-PRB allocation | Sharp | imported from 3GU |
R1‑180266 | - | - | - |
R1‑1802660 | Discussion on NB-IoT TDD-UL | Sharp | imported from 3GU |
R1‑1802661 | Remaining issues on RACH procedure | Sharp | imported from 3GU |
R1‑1802662 | Open issues on codeword mapping | Sharp | imported from 3GU |
R1‑1802663 | On A-CSI reporting in CA | Sharp | imported from 3GU |
R1‑1802664 | Remaining issues on beam failure recovery | Sharp | imported from 3GU |
R1‑1802665 | Remaining issues for HARQ-ACK transmission overlapping with multiple SR transmission | Sharp | imported from 3GU |
R1‑1802666 | On A-CSI reporting in CA | Sharp | imported from 3GU |
R1‑1802667 | Deployment scenarios for NR unlicensed operation | Sharp | imported from 3GU |
R1‑1802668 | Calibration results of Indoor Hotspot – eMBB for ITU self-evaluation | Sharp | imported from 3GU |
R1‑1802669 | Calibration results of Dense Urban – eMBB for ITU self-evaluation | Sharp | imported from 3GU |
R1‑180267 | - | - | - |
R1‑1802670 | Calibration results of Rural – eMBB for ITU self-evaluation | Sharp | imported from 3GU |
R1‑1802671 | Calibration results of Urban Macro – mMTC for ITU self-evaluation | Sharp | imported from 3GU |
R1‑1802672 | Calibration results of Urban Macro – URLLC for ITU self-evaluation | Sharp | imported from 3GU |
R1‑1802673 | PHR for CA with sTTI | Lenovo, Motorola Mobility | imported from 3GU |
R1‑1802674 | DL control aspects of URLLC | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802675 | Remaining details for NR paging | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802676 | Remaining details on random access procedure | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802677 | Remaining details on radio link monitoring | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802678 | On non-CA NR UL power control | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802679 | On CA-related NR UL power control | Motorola Mobility, Lenovo | imported from 3GU |
R1‑180268 | - | - | - |
R1‑1802680 | Multiplexing of URLLC and eMBB uplink channels | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802681 | Calibration Results for ITU Self-evaluation | Motorola Mobility, Lenovo | imported from 3GU |
R1‑1802682 | Remaining issues on dynamic SFI | Xiaomi Communications | imported from 3GU |
R1‑1802683 | Remaining issues and TP on interleaved CCE-to-REG mapping | Huawei, HiSilicon | imported from 3GU |
R1‑1802684 | Correction on DMRS sequence initialization for PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1802685 | Discussion and TP on mapping to physical resources for DMRS for PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1802686 | Solutions for reducing channel estimation complexity for PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑1802687 | Remaining issues on UE PDCCH capability | Huawei, HiSilicon | imported from 3GU |
R1‑1802688 | Solutions and TP for multi-TRP PDCCH transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1802689 | Correction on UCI repetition procedure in 38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑180269 | - | - | - |
R1‑1802690 | Handling of PUCCH transmsision with partial overlap | Huawei, HiSilicon | imported from 3GU |
R1‑1802691 | Group re-ordering of new CGS | Huawei, HiSilicon | imported from 3GU |
R1‑1802692 | Transmission of PUCCH and PUSCH with partial overlap | Huawei, HiSilicon | imported from 3GU |
R1‑1802693 | Aperiodic CSI feedback on PUCCH in NR | Huawei, HiSilicon | imported from 3GU |
R1‑1802694 | Correction on PUCCH multiplexing in 38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802695 | Correction on DMRS for PUCCH in 38.211 | Huawei, HiSilicon | imported from 3GU |
R1‑1802696 | Intra-slot hopping pattern for long PUCCH over multiple slots | Huawei, HiSilicon | imported from 3GU |
R1‑1802697 | Remaining issues on HARQ management | Huawei, HiSilicon | imported from 3GU |
R1‑1802698 | Draft CR on frame structure and slot format for multiple numerology in TS38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802699 | Draft CR on RMSI PRB grid in TS38.211 | Huawei, HiSilicon | imported from 3GU |
R1‑180270 | - | - | - |
R1‑1802700 | Discussion and TP on OFDM signal generation | Huawei, HiSilicon | imported from 3GU |
R1‑1802701 | TP on BWP switching and cross-carrier scheduling with different numerology | Huawei, HiSilicon | imported from 3GU |
R1‑1802702 | Discussion and TP on slot format for ECP | Huawei, HiSilicon | imported from 3GU |
R1‑1802703 | Draft CR on time domain resource allocation for ECP in TS38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑1802704 | Draft CR on rate matching around SS block in TS38.211 | Huawei, HiSilicon | imported from 3GU |
R1‑1802705 | Draft CR on DVRB in TS38.211 | Huawei, HiSilicon | imported from 3GU |
R1‑1802706 | Draft CR on resource allocation in TS38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑1802707 | Draft CR on TBS in TS38.214 | Huawei, HiSilicon | imported from 3GU |
R1‑1802708 | SRS carrier switching involving SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1802709 | Draft CR on ACK codebook in TS38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑180271 | - | - | - |
R1‑1802710 | Draft CR on TA offset for CA in TS38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802711 | TP on Case 1 HARQ timing for EN-DC | Huawei, HiSilicon | imported from 3GU |
R1‑1802712 | TP on TA-offset for SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1802713 | TP on UCI multiplexing between UL and SUL | Huawei, HiSilicon | imported from 3GU |
R1‑1802714 | Correction on power control for EN-DC in TS36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802715 | On coexistence between LTE and NR | Huawei, HiSilicon | imported from 3GU |
R1‑1802716 | Discussion on Multi-TRP cooperation for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1802717 | Discussion on the motivation of High Accuracy Time Synchronization for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1802718 | Discussion on the feasibility of High Accuracy Time Synchronization for NR | Huawei, HiSilicon | imported from 3GU |
R1‑1802719 | TP on UL data transmission procedure | Huawei, HiSilicon | imported from 3GU |
R1‑180272 | - | - | - |
R1‑1802720 | V2X path loss and shadowing | Huawei, HiSilicon | imported from 3GU |
R1‑1802721 | V2X fast fading model | Huawei, HiSilicon | imported from 3GU |
R1‑1802722 | High level consideration on NR unlicensed band operation | Huawei, HiSilicon | imported from 3GU |
R1‑1802723 | NR Numerology on unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R1‑1802724 | Corrections on Slot configuration in TS 38.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802725 | Ray Tracing simulation result for NTN | Huawei, HiSilicon | imported from 3GU |
R1‑1802726 | On the multipath propagation in satellite to UE link | Huawei, HiSilicon | imported from 3GU |
R1‑1802727 | Discussion and text proposal for HARQ-ACK on PUCCH format 0/1 | Huawei, HiSilicon | imported from 3GU |
R1‑1802728 | Draft reply LS on channel raster and SS raster | Huawei, HiSilicon | imported from 3GU |
R1‑1802729 | Remaining issues on reserved resources and rate-matching | Huawei, HiSilicon | imported from 3GU |
R1‑180273 | - | - | - |
R1‑1802730 | eV2X Phase III Channel Modeling | Cohere Technologies | imported from 3GU |
R1‑1802731 | Draft response to LS to RAN1 on beam failure recovery | Ericsson | imported from 3GU |
R1‑1802732 | On a resource specific sequence mapping for CSI-RS | Ericsson | imported from 3GU |
R1‑1802733 | Advanced CSI codebook subset restriction | Ericsson | imported from 3GU |
R1‑1802734 | Draft CR 36.211 for Correction on CDM-8 Sequence Mapping for 24 and 32 ports | Ericsson | imported from 3GU |
R1‑1802735 | Corrections for UL Antenna Port Mapping & Identification | Ericsson | imported from 3GU |
R1‑1802736 | Corrections on CW mapping and data scrambling | Ericsson | imported from 3GU |
R1‑1802737 | Corrections for Codebook Based UL MIMO | Ericsson | imported from 3GU |
R1‑1802738 | Corrections for Non-codebook Based UL MIMO | Ericsson | imported from 3GU |
R1‑1802739 | Extension on PRB bundling for DL | Ericsson | imported from 3GU |
R1‑180274 | - | - | - |
R1‑1802740 | CSI framework simplification | Ericsson | imported from 3GU |
R1‑1802741 | Corrections and clarifications for CSI measurement | Ericsson | imported from 3GU |
R1‑1802742 | Clarification and correction on CSI reporting | Ericsson | imported from 3GU |
R1‑1802743 | Remaining details on beam management | Ericsson | imported from 3GU |
R1‑1802744 | Remaining details on beam recovery | Ericsson | imported from 3GU |
R1‑1802745 | Multi-cell beam recovery | Ericsson | imported from 3GU |
R1‑1802746 | Beam management in C-DRX | Ericsson | imported from 3GU |
R1‑1802747 | Joint activation of aperiodic and semi-persistent CSI-IM and ZP CSI-RS | Ericsson | imported from 3GU |
R1‑1802748 | Frequency parametrization for Type II CSI codebook | Ericsson | imported from 3GU |
R1‑1802749 | On multi-panel codebook extension | Ericsson | imported from 3GU |
R1‑180275 | - | - | - |
R1‑1802750 | On activation and deactivation of semi-persistent CSI reporting on PUSCH | Ericsson | imported from 3GU |
R1‑1802751 | On 1ms CSI-IM periodicity | Ericsson | imported from 3GU |
R1‑1802752 | Remaining issues related to RS multiplexing | Ericsson | imported from 3GU |
R1‑1802753 | Remaining issues on CSI-RS | Ericsson | imported from 3GU |
R1‑1802754 | Remaining issues on DMRS | Ericsson | imported from 3GU |
R1‑1802755 | Remaining issues on PT-RS | Ericsson | imported from 3GU |
R1‑1802756 | Remaining issues on SRS | Ericsson | imported from 3GU |
R1‑1802757 | Corrections related to TRS | Ericsson | imported from 3GU |
R1‑1802758 | Corrections related to QCL | Ericsson | imported from 3GU |
R1‑1802759 | On correlation of CSI-RS Gold sequences | Ericsson | imported from 3GU |
R1‑180276 | - | - | - |
R1‑1802760 | On correlation of DMRS Gold sequences | Ericsson | imported from 3GU |
R1‑1802761 | Evaluations on TRS periodicity | Ericsson | imported from 3GU |
R1‑1802762 | Further evaluations on PT-RS | Ericsson | imported from 3GU |
R1‑1802763 | On UE TX frequency accuracy with TRS based synchronization | Ericsson | imported from 3GU |
R1‑1802764 | Type 1 mapping of half-pi BPSK DFTS DM-RS | Ericsson | imported from 3GU |
R1‑1802765 | Rel-15 NR UE feature list for MIMO and RS | Ericsson | imported from 3GU |
R1‑1802766 | On remaining issues of UE features | Ericsson | imported from 3GU |
R1‑1802767 | Signature Design For NoMA | Ericsson | imported from 3GU |
R1‑1802768 | Receiver design for NoMA | Ericsson | imported from 3GU |
R1‑1802769 | Procedures related to NoMA | Ericsson | imported from 3GU |
R1‑180277 | - | - | - |
R1‑1802770 | Evaluation methodology and metrics for NoMA | Ericsson | imported from 3GU |
R1‑1802771 | NR-U evaluation methodology | Ericsson | imported from 3GU |
R1‑1802772 | On NR-U deployment scenarios | Ericsson | imported from 3GU |
R1‑1802773 | Candidate spectrum for NR unlicensed operation | Ericsson | imported from 3GU |
R1‑1802774 | Solutions and techniques for NR unlicensed operation | Ericsson | imported from 3GU |
R1‑1802775 | On NR operation in 60GHz unlicensed band | Ericsson | imported from 3GU |
R1‑1802776 | On Interlace Design for NR-U Uplink | Ericsson | imported from 3GU |
R1‑1802777 | On the Introduction of a Discovery Reference Signal | Ericsson | imported from 3GU |
R1‑1802778 | On PRACH for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑1802779 | On Frame Structure for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑180278 | - | - | - |
R1‑1802780 | On Autonomous UL Transmissions for NR in Unlicensed Spectrum | Ericsson | imported from 3GU |
R1‑1802781 | Numerology for NR operation in unlicensed spectrum | Ericsson | imported from 3GU |
R1‑1802782 | Remaining Issue of CQI and MCS | Ericsson Inc. | imported from 3GU |
R1‑1802783 | Design of DL aspects for TDD support in feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802784 | Design of UL aspects for TDD support in feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802785 | Design of common aspects for TDD support in feNB-IoT | Intel Corporation | imported from 3GU |
R1‑1802786 | Text proposal on collision between PUCCH format 1/1a/1b/3 and sPUCCH/sPUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑1802787 | Text proposal on HARQ-ACK feedback procedure in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802788 | Text proposal on HARQ-ACK feedback based on dynamic codebook size in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802789 | Miscellaneous text proposals on 36.211 | Huawei, HiSilicon | imported from 3GU |
R1‑180279 | - | - | - |
R1‑1802790 | Discussion and text proposal on DAI size determination | Huawei, HiSilicon | imported from 3GU |
R1‑1802791 | Introduction of SRS antenna switching for 4 ports in 36.213 | Huawei, HiSilicon | imported from 3GU |
R1‑1802792 | V2X Reception Cadence Review | OnStar Europe | imported from 3GU |
R1‑1802793 | High Speed V2X Performance | OnStar Europe | imported from 3GU |
R1‑1802794 | Corrections to resource allocation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802795 | Corrections on interrupted transmission indication in TS 38.213 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802796 | New System Comparison Results of PC5 and Other Technologies | OnStar Europe | imported from 3GU |
R1‑1802797 | NTN NR impacts due to Phase Noise | Fraunhofer IIS | imported from 3GU |
R1‑1802798 | On UL control enhancements for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802799 | On PUSCH enhancements for URLLC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180280 | - | - | - |
R1‑1802800 | Bandwidth part operations during handover | PANASONIC | imported from 3GU |
R1‑1802801 | NR-NTN: DM-RS time position versus frequency drift in NTN deployment scenarios | THALES | imported from 3GU |
R1‑1802802 | NR-NTN: DM-RS frequency position versus coherence bandwidth in GEO and LEO deployment scenarios | THALES | imported from 3GU |
R1‑1802803 | NR-NTN: Applicability of NR numerology to satellite communication | THALES | imported from 3GU |
R1‑1802804 | Correction of RRC parameter for SPT PUCCH (36.213) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802805 | On LTE HARQ-ACK resource determination in 1Tx EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802806 | Considerations on NoMA Performance Evaluation | Vodafone Group Plc | imported from 3GU |
R1‑1802807 | eV2X Evaluation Methodology and Performance Metrics | Fraunhofer IIS | imported from 3GU |
R1‑1802808 | Further clarification for the uplink power control | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802809 | Remaining details on synchronization signal design | Qualcomm Incorporated | imported from 3GU |
R1‑180281 | - | - | - |
R1‑1802810 | Remaining details on NR-PBCH | Qualcomm Incorporated | imported from 3GU |
R1‑1802811 | Remaining system information delivery consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1802812 | Paging design consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1802813 | Remaining details on PRACH formats | Qualcomm Incorporated | imported from 3GU |
R1‑1802814 | Remaining details on RACH procedure | Qualcomm Incorporated | imported from 3GU |
R1‑1802815 | Remaining details on measurement for mobility management | Qualcomm Incorporated | imported from 3GU |
R1‑1802816 | Radio link monitoring consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1802817 | Remaining details on Timing advance granularity and adjustment consideration | Qualcomm Incorporated | imported from 3GU |
R1‑1802818 | Maintenance for codebook based UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑1802819 | Maintenance for non-codebook based UL transmission | Qualcomm Incorporated | imported from 3GU |
R1‑180282 | - | - | - |
R1‑1802820 | Maintenance for PRB bundling for DL | Qualcomm Incorporated | imported from 3GU |
R1‑1802821 | Maintenance for CSI measurement | Qualcomm Incorporated | imported from 3GU |
R1‑1802822 | Maintenance for CSI reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1802823 | Beam management for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1802824 | Beam recovery procedures | Qualcomm Incorporated | imported from 3GU |
R1‑1802825 | Remaining details on MCS | Qualcomm Incorporated | imported from 3GU |
R1‑1802826 | Maintenance for Multiplexing of RS | Qualcomm Incorporated | imported from 3GU |
R1‑1802827 | Maintenance for on CSI-RS | Qualcomm Incorporated | imported from 3GU |
R1‑1802828 | Maintenance for DMRS | Qualcomm Incorporated | imported from 3GU |
R1‑1802829 | PTRS considerations | Qualcomm Incorporated | imported from 3GU |
R1‑180283 | - | - | - |
R1‑1802830 | Maintenance for SRS | Qualcomm Incorporated | imported from 3GU |
R1‑1802831 | Remaining issues on TRS | Qualcomm Incorporated | imported from 3GU |
R1‑1802832 | Remaining details on QCL | Qualcomm Incorporated | imported from 3GU |
R1‑1802833 | Remaining issues on PDCCH structure | Qualcomm Incorporated | imported from 3GU |
R1‑1802834 | Remaining issues on control resource set and search space | Qualcomm Incorporated | imported from 3GU |
R1‑1802835 | Remaining issues for slot format indication | Qualcomm Incorporated | imported from 3GU |
R1‑1802836 | Discussion on DCI related issues | Qualcomm Incorporated | imported from 3GU |
R1‑1802837 | Remaining issues for short PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1802838 | Remaining issues for long PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1802839 | Remaining issues for multiplexing UCI on PUSCH | Qualcomm Incorporated | imported from 3GU |
R1‑180284 | - | - | - |
R1‑1802840 | Remaining issues for resource allocation for PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1802841 | Remaining Issues on DL/UL resource allocation | Qualcomm Incorporated | imported from 3GU |
R1‑1802842 | Remaining Issues on DL/UL Scheduling, Processing Time and HARQ management | Qualcomm Incorporated | imported from 3GU |
R1‑1802843 | Remaining Issues on Soft buffer management | Qualcomm Incorporated | imported from 3GU |
R1‑1802844 | Remaining issues on BWP | Qualcomm Incorporated | imported from 3GU |
R1‑1802845 | Remaining issues on CA | Qualcomm Incorporated | imported from 3GU |
R1‑1802846 | On rate matching/puncturing for NR DL and UL channels | Qualcomm Incorporated | imported from 3GU |
R1‑1802847 | Remaining issues on power control for NR | Qualcomm Incorporated | imported from 3GU |
R1‑1802848 | Power control for NR CA | Qualcomm Incorporated | imported from 3GU |
R1‑1802849 | NR Features and Capabilities | Qualcomm Incorporated | imported from 3GU |
R1‑180285 | - | - | - |
R1‑1802850 | Considerations for UE feature support of 60kHz | Qualcomm Incorporated | imported from 3GU |
R1‑1802851 | Considerations for CQI and MCS for URLLC | Qualcomm Incorporated | imported from 3GU |
R1‑1802852 | Considerations on new DCI format | Qualcomm Incorporated | imported from 3GU |
R1‑1802853 | Considerations on PDCCH repetition | Qualcomm Incorporated | imported from 3GU |
R1‑1802854 | eMBB and URLLC dynamic multiplexing and preemption indication on the uplink | Qualcomm Incorporated | imported from 3GU |
R1‑1802855 | Impact of UE processing timeline on the URLLC performance | Qualcomm Incorporated | imported from 3GU |
R1‑1802856 | Transmitter side signaling processing schemes for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1802857 | Receivers for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1802858 | Procedures related to NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑1802859 | Link and system level evaluation for NOMA | Qualcomm Incorporated | imported from 3GU |
R1‑180286 | - | - | - |
R1‑1802860 | Evaluation scenarios for NR V2X use cases | Qualcomm Incorporated | imported from 3GU |
R1‑1802861 | Simulation methodology for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1802862 | Summary of unofficial email discussion on NR-U simulation methodology | Qualcomm Incorporated | imported from 3GU |
R1‑1802863 | Deployment scenarios for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1802864 | Views on spectrum for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1802865 | Potential solutins and techniques for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1802866 | Frame Structure for NR unlicensed | Qualcomm Incorporated | imported from 3GU |
R1‑1802867 | NR-U AUL | Qualcomm Incorporated | imported from 3GU |
R1‑1802868 | Waveform options for 60GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑1802869 | Waveform under PSD limitation for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑180287 | - | - | - |
R1‑1802870 | Remaining aspects of NR-LTE coexistence | Qualcomm Incorporated | imported from 3GU |
R1‑1802871 | NR-U AUL | Qualcomm Incorporated | imported from 3GU |
R1‑1802872 | Waveform options for 60GHz band | Qualcomm Incorporated | imported from 3GU |
R1‑1802873 | Waveform under PSD limitation for NR-U | Qualcomm Incorporated | imported from 3GU |
R1‑1802874 | Views on remaining details of DL DMRS | KT Corp. | imported from 3GU |
R1‑1802875 | Consideration on the NOMA accessibility | KT Corp. | imported from 3GU |
R1‑1802876 | Considerations on UL UE preemptions | KT Corp. | imported from 3GU |
R1‑1802877 | Remaining details of URLLC for LTE evaluations | Ericsson | imported from 3GU |
R1‑1802878 | Techniques for downlink control in URLLC | Ericsson | imported from 3GU |
R1‑1802879 | URLLC techniques for PDSCH | Ericsson | imported from 3GU |
R1‑180288 | - | - | - |
R1‑1802880 | On PUCCH/SPUCCH reliability enhancement for URLLC | Ericsson | imported from 3GU |
R1‑1802881 | URLLC techniques for PUSCH | Ericsson | imported from 3GU |
R1‑1802882 | Latency for URLLC | Ericsson | imported from 3GU |
R1‑1802883 | Reliability for URLLC | Ericsson | imported from 3GU |
R1‑1802884 | Remaining issues on pre-emption indication | Sequans Communications | imported from 3GU |
R1‑1802885 | Considerations for UL multiplexing with different transmission durations | Sequans Communications | imported from 3GU |
R1‑1802886 | Initial link level simulation results of non-orthogonal multiple-access schemes | CATR | imported from 3GU |
R1‑1802887 | DL Control Techniques for LTE URLLC | Fraunhofer HHI | imported from 3GU |
R1‑1802888 | Resource Pool Sharing between V2X Mode 3 and Mode 4 UEs | Fraunhofer HHI | imported from 3GU |
R1‑1802889 | Open issues on Synchronisation Signal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180289 | - | - | - |
R1‑1802890 | Remaining details related to SS/PBCH block | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802891 | Remaining open issues on RMSI CORESET configuration | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802892 | On indication of valid locations of SS/PBCH with RMSI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802893 | On BWP for Other System Information Delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802894 | BWP determination for paging delivery | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802895 | Remaining issues on mobility measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802896 | LLS assumptions of NR UL NOMA for mMTC scenario | NICT | imported from 3GU |
R1‑1802897 | Remaining issues of TBS determination | Huawei, HiSilicon | imported from 3GU |
R1‑1802898 | Blind detection ambiguity for DCI | Huawei, HiSilicon | imported from 3GU |
R1‑1802899 | V2X channel modelling and other issues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180290 | - | - | - |
R1‑1802900 | Remaining details of high capacity stationary wireless link | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1802901 | [DRAFT] Reply LS on formula or table for L1 data rate | Ericsson | imported from 3GU |
R1‑1802902 | Remaining issues of PDCCH structure | Ericsson | imported from 3GU |
R1‑1802903 | Remaining issues of search space | Ericsson | imported from 3GU |
R1‑1802904 | Remaining issues of GC-PDCCH | Ericsson | imported from 3GU |
R1‑1802905 | Remaining issues of the DCI contents and formats | Ericsson | imported from 3GU |
R1‑1802906 | On UCI Multiplexing on PUCCH | Ericsson | imported from 3GU |
R1‑1802907 | On PUCCH Remaining Issues | Ericsson | imported from 3GU |
R1‑1802908 | On Remaining Issues on UCI Multiplexing on PUSCH | Ericsson | imported from 3GU |
R1‑1802909 | On PUCCH Resource Allocation before RRC Connection | Ericsson | imported from 3GU |
R1‑180291 | - | - | - |
R1‑1802910 | On UL/DL resource allocation | Ericsson | imported from 3GU |
R1‑1802911 | On DL/UL scheduling and HARQ management | Ericsson | imported from 3GU |
R1‑1802912 | Remaining issues for CBG based HARQ | Ericsson | imported from 3GU |
R1‑1802913 | On UL data transmission procedures | Ericsson | imported from 3GU |
R1‑1802914 | On Multiplexing data with different transmission durations | Ericsson | imported from 3GU |
R1‑1802915 | DL SPS | Ericsson | imported from 3GU |
R1‑1802916 | On remaining issues of BWP | Ericsson | imported from 3GU |
R1‑1802917 | On remaining issues of CA | Ericsson | imported from 3GU |
R1‑1802918 | On the rate matching around the CORESET | Ericsson | imported from 3GU |
R1‑1802919 | On remaining issues of NR-LTE co-existence | Ericsson | imported from 3GU |
R1‑180292 | - | - | - |
R1‑1802920 | Remaining issues for UL power control | Ericsson | imported from 3GU |
R1‑1802921 | Remaining issues for LTE-NR power sharing | Ericsson | imported from 3GU |
R1‑1802922 | Remaining issues for PHR | Ericsson | imported from 3GU |
R1‑1802923 | Considerations on two-port DMRS design for V2X Phase 2 | ITL | imported from 3GU |
R1‑1802924 | RV selection fro AUL transmissions | Ericsson Japan K.K. | imported from 3GU |
R1‑1802925 | On uplink multiplexing with different transmission durations | KDDI Corporation | imported from 3GU |
R1‑1802926 | On uplink multiplexing of transmissions with different reliability requirements | KDDI Corporation | imported from 3GU |
R1‑1802927 | sTTI and SPT terminology | Ericsson | imported from 3GU |
R1‑1802928 | TP on sTTI terminology 36.211 | Ericsson | imported from 3GU |
R1‑1802929 | TP on sTTI terminology 36.213 | Ericsson | imported from 3GU |
R1‑180293 | - | - | - |
R1‑1802930 | Excluding of TDM support for CRS-based SPDCCH and DMRS-based PDSCH | Ericsson, Nokia, Nokia Shanghai Bell, Intel | imported from 3GU |
R1‑1802931 | TP on SPUCCH corrections in 36.213 | Ericsson | imported from 3GU |
R1‑1802932 | Remaining issue on channel access for UL partial subframe on LAA Scell | WILUS Inc. | imported from 3GU |
R1‑1802933 | Discussion on channel access for AUL transmission | WILUS Inc. | imported from 3GU |
R1‑1802934 | Remaining issues on group-common PDCCH for NR | WILUS Inc. | imported from 3GU |
R1‑1802935 | Remaining issues on long PUCCH over multiple slots | WILUS Inc. | imported from 3GU |
R1‑1802936 | Remaining issues on multiplexing data with different duration | WILUS Inc. | imported from 3GU |
R1‑1802937 | Remaining issue on resource allocation under cross-BWP Scheduling | WILUS Inc. | imported from 3GU |
R1‑1802938 | Consideration on dynamic HARQ-ACK codebook | WILUS Inc. | imported from 3GU |
R1‑1802939 | UCI multiplexing considering URLLC data in PUSCH | WILUS Inc. | imported from 3GU |
R1‑180294 | - | - | - |
R1‑1802940 | Remaining details of synchronization signals | Ericsson | imported from 3GU |
R1‑1802941 | Remaining details of PBCH | Ericsson | imported from 3GU |
R1‑1802942 | Remaining details of remaining minimum system information | Ericsson | imported from 3GU |
R1‑1802943 | On other system information delivery | Ericsson | imported from 3GU |
R1‑1802944 | Remaining details of paging design | Ericsson | imported from 3GU |
R1‑1802945 | Remaining details of PRACH formats | Ericsson | imported from 3GU |
R1‑1802946 | Remaining details of RACH procedure | Ericsson | imported from 3GU |
R1‑1802947 | Remaining details for mobility measurements | Ericsson | imported from 3GU |
R1‑1802948 | Radio link monitoring for mobility management | Ericsson | imported from 3GU |
R1‑1802949 | Synchronization assistance for CSI-RS-based measurements | Ericsson | imported from 3GU |
R1‑180295 | - | - | - |
R1‑1802950 | On multiple preamble transmissions for contention free random access | Ericsson | imported from 3GU |
R1‑1802951 | L1 reporting of other cells | Ericsson | imported from 3GU |
R1‑1802952 | IMT-2020 self-evaluation: Mobility evaluations for NR | Ericsson | imported from 3GU |
R1‑1802953 | IMT-2020 self evaluation: On eMBB user experienced data rate | Ericsson | imported from 3GU |
R1‑1802954 | IMT-2020 self evaluation: Radio Network Energy Performance | Ericsson | imported from 3GU |
R1‑1802955 | IMT-2020 self-evaluation calibration mMTC connection density for LTE-MTC and NB-IoT | Ericsson | imported from 3GU |
R1‑1802956 | IMT2020 self evaluation: On eMBB area traffic capacity | Ericsson | imported from 3GU |
R1‑1802957 | IMT-2020 self-evaluation: Peak data rate and peak spectrum efficiency evaluations for NR | Ericsson | imported from 3GU |
R1‑1802958 | Correction on Msg3 power control | ZTE, SaneChips | imported from 3GU |
R1‑1802959 | Considerations on LTE CP latency reduction | Vodafone Italia SpA | imported from 3GU |
R1‑180296 | - | - | - |
R1‑1802960 | NR-NTN: Requirements for Channel Modeling | THALES | imported from 3GU |
R1‑1802961 | Text proposal to clause 8 of 36.213 regarding shortened processing time | Ericsson | imported from 3GU |
R1‑1802962 | Text proposal on power prioritization for slot/subslot operation in CA scenario | Ericsson | imported from 3GU |
R1‑1802963 | Text proposal on 1ms HARQ bits inclusion in a slot/subslot transmission | Ericsson, LG Electronics | imported from 3GU |
R1‑1802964 | Text proposal related to slot/subslot scheduling | Ericsson | imported from 3GU |
R1‑1802965 | Text proposal on SPS validation for short TTI | Ericsson | imported from 3GU |
R1‑1802966 | Text proposal on closed loop power control for SPUCCH | Ericsson | imported from 3GU |
R1‑1802967 | Text proposal on HARQ-ACK reporting for short TTI and shortened processing time | Ericsson | imported from 3GU |
R1‑1802968 | Text proposal on power headroom computation for short TTI | Ericsson | imported from 3GU |
R1‑1802969 | Text proposal to clause 8 of 36.213 regarding short TTI | Ericsson | imported from 3GU |
R1‑180297 | - | - | - |
R1‑1802970 | Control Plane latency reduction | Ericsson | imported from 3GU |
R1‑1802971 | Introduction of reduced control plane latency | Ericsson | imported from 3GU |
R1‑1802972 | NR-NTN channel modeling - antenna patterns | THALES | imported from 3GU |
R1‑1802973 | NR-NTN channel modeling - Calibration parameters | THALES | imported from 3GU |
R1‑1802974 | NR-NTN Channel Modeling - Coordinate system | THALES | imported from 3GU |
R1‑1802975 | NR-NTN channel modeling - Non frequency selective fast fading model | THALES | imported from 3GU |
R1‑1802976 | NR-NTN channel modeling - Frequency selective fast fading model | THALES | imported from 3GU |
R1‑1802977 | IMT-2020 self-evaluation: CP latency in NR | Ericsson | imported from 3GU |
R1‑1802978 | IMT-2020 self-evaluation: Reliability in NR | Ericsson | imported from 3GU |
R1‑1802979 | IMT-2020 self-evaluation: UP latency in NR | Ericsson | imported from 3GU |
R1‑180298 | - | - | - |
R1‑1802980 | NR-NTN channel modeling - Antenna patterns | THALES | imported from 3GU |
R1‑1802981 | On calculation of UE processing time | Ericsson | imported from 3GU |
R1‑1802982 | void | ETSI | imported from 3GU |
R1‑1802983 | void | ETSI | imported from 3GU |
R1‑1802984 | void | ETSI | imported from 3GU |
R1‑1802985 | void | ETSI | imported from 3GU |
R1‑1802986 | void | ETSI | imported from 3GU |
R1‑1802987 | void | ETSI | imported from 3GU |
R1‑1802988 | void | ETSI | imported from 3GU |
R1‑1802989 | void | ETSI | imported from 3GU |
R1‑180299 | - | - | - |
R1‑1802990 | void | ETSI | imported from 3GU |
R1‑1802991 | void | ETSI | imported from 3GU |
R1‑1802992 | void | ETSI | imported from 3GU |
R1‑1802993 | void | ETSI | imported from 3GU |
R1‑1802994 | void | ETSI | imported from 3GU |
R1‑1802995 | void | ETSI | imported from 3GU |
R1‑1802996 | void | ETSI | imported from 3GU |
R1‑1802997 | void | ETSI | imported from 3GU |
R1‑1802998 | void | ETSI | imported from 3GU |
R1‑1802999 | void | ETSI | imported from 3GU |
R1‑180300 | - | - | - |
R1‑1803000 | void | ETSI | imported from 3GU |
R1‑1803001 | void | ETSI | imported from 3GU |
R1‑1803002 | void | ETSI | imported from 3GU |
R1‑1803003 | void | ETSI | imported from 3GU |
R1‑1803004 | void | ETSI | imported from 3GU |
R1‑1803005 | void | ETSI | imported from 3GU |
R1‑1803006 | void | ETSI | imported from 3GU |
R1‑1803007 | void | ETSI | imported from 3GU |
R1‑1803008 | void | ETSI | imported from 3GU |
R1‑1803009 | void | ETSI | imported from 3GU |
R1‑180301 | - | - | - |
R1‑1803010 | void | ETSI | imported from 3GU |
R1‑1803011 | void | ETSI | imported from 3GU |
R1‑1803012 | void | ETSI | imported from 3GU |
R1‑1803013 | void | ETSI | imported from 3GU |
R1‑1803014 | void | ETSI | imported from 3GU |
R1‑1803015 | void | ETSI | imported from 3GU |
R1‑1803016 | void | ETSI | imported from 3GU |
R1‑1803017 | void | ETSI | imported from 3GU |
R1‑1803018 | void | ETSI | imported from 3GU |
R1‑1803019 | void | ETSI | imported from 3GU |
R1‑180302 | - | - | - |
R1‑1803020 | void | ETSI | imported from 3GU |
R1‑1803021 | void | ETSI | imported from 3GU |
R1‑1803022 | void | ETSI | imported from 3GU |
R1‑1803023 | void | ETSI | imported from 3GU |
R1‑1803024 | void | ETSI | imported from 3GU |
R1‑1803025 | void | ETSI | imported from 3GU |
R1‑1803026 | void | ETSI | imported from 3GU |
R1‑1803027 | void | ETSI | imported from 3GU |
R1‑1803028 | void | ETSI | imported from 3GU |
R1‑1803029 | void | ETSI | imported from 3GU |
R1‑180303 | - | - | - |
R1‑1803030 | void | ETSI | imported from 3GU |
R1‑1803031 | void | ETSI | imported from 3GU |
R1‑1803032 | void | ETSI | imported from 3GU |
R1‑1803033 | void | ETSI | imported from 3GU |
R1‑1803034 | void | ETSI | imported from 3GU |
R1‑1803035 | void | ETSI | imported from 3GU |
R1‑1803036 | void | ETSI | imported from 3GU |
R1‑1803037 | void | ETSI | imported from 3GU |
R1‑1803038 | void | ETSI | imported from 3GU |
R1‑1803039 | void | ETSI | imported from 3GU |
R1‑180304 | - | - | - |
R1‑1803040 | void | ETSI | imported from 3GU |
R1‑1803041 | void | ETSI | imported from 3GU |
R1‑1803042 | void | ETSI | imported from 3GU |
R1‑1803043 | void | ETSI | imported from 3GU |
R1‑1803044 | void | ETSI | imported from 3GU |
R1‑1803045 | void | ETSI | imported from 3GU |
R1‑1803046 | void | ETSI | imported from 3GU |
R1‑1803047 | void | ETSI | imported from 3GU |
R1‑1803048 | void | ETSI | imported from 3GU |
R1‑1803049 | void | ETSI | imported from 3GU |
R1‑180305 | - | - | - |
R1‑1803050 | void | ETSI | imported from 3GU |
R1‑1803051 | void | ETSI | imported from 3GU |
R1‑1803052 | void | ETSI | imported from 3GU |
R1‑1803053 | void | ETSI | imported from 3GU |
R1‑1803054 | void | ETSI | imported from 3GU |
R1‑1803055 | void | ETSI | imported from 3GU |
R1‑1803056 | void | ETSI | imported from 3GU |
R1‑1803057 | void | ETSI | imported from 3GU |
R1‑1803058 | void | ETSI | imported from 3GU |
R1‑1803059 | void | ETSI | imported from 3GU |
R1‑180306 | - | - | - |
R1‑1803060 | void | ETSI | imported from 3GU |
R1‑1803061 | void | ETSI | imported from 3GU |
R1‑1803062 | void | ETSI | imported from 3GU |
R1‑1803063 | void | ETSI | imported from 3GU |
R1‑1803064 | void | ETSI | imported from 3GU |
R1‑1803065 | void | ETSI | imported from 3GU |
R1‑1803066 | void | ETSI | imported from 3GU |
R1‑1803067 | void | ETSI | imported from 3GU |
R1‑1803068 | void | ETSI | imported from 3GU |
R1‑1803069 | void | ETSI | imported from 3GU |
R1‑180307 | - | - | - |
R1‑1803070 | void | ETSI | imported from 3GU |
R1‑1803071 | void | ETSI | imported from 3GU |
R1‑1803072 | void | ETSI | imported from 3GU |
R1‑1803073 | void | ETSI | imported from 3GU |
R1‑1803074 | void | ETSI | imported from 3GU |
R1‑1803075 | void | ETSI | imported from 3GU |
R1‑1803076 | void | ETSI | imported from 3GU |
R1‑1803077 | void | ETSI | imported from 3GU |
R1‑1803078 | void | ETSI | imported from 3GU |
R1‑1803079 | void | ETSI | imported from 3GU |
R1‑180308 | - | - | - |
R1‑1803080 | void | ETSI | imported from 3GU |
R1‑1803081 | void | ETSI | imported from 3GU |
R1‑1803082 | void | ETSI | imported from 3GU |
R1‑1803083 | void | ETSI | imported from 3GU |
R1‑1803084 | void | ETSI | imported from 3GU |
R1‑1803085 | void | ETSI | imported from 3GU |
R1‑1803086 | void | ETSI | imported from 3GU |
R1‑1803087 | void | ETSI | imported from 3GU |
R1‑1803088 | void | ETSI | imported from 3GU |
R1‑1803089 | void | ETSI | imported from 3GU |
R1‑180309 | - | - | - |
R1‑1803090 | void | ETSI | imported from 3GU |
R1‑1803091 | void | ETSI | imported from 3GU |
R1‑1803092 | void | ETSI | imported from 3GU |
R1‑1803093 | void | ETSI | imported from 3GU |
R1‑1803094 | void | ETSI | imported from 3GU |
R1‑1803095 | void | ETSI | imported from 3GU |
R1‑1803096 | void | ETSI | imported from 3GU |
R1‑1803097 | void | ETSI | imported from 3GU |
R1‑1803098 | void | ETSI | imported from 3GU |
R1‑1803099 | void | ETSI | imported from 3GU |
R1‑180310 | - | - | - |
R1‑1803100 | void | ETSI | imported from 3GU |
R1‑1803101 | void | ETSI | imported from 3GU |
R1‑1803102 | void | ETSI | imported from 3GU |
R1‑1803103 | void | ETSI | imported from 3GU |
R1‑1803104 | void | ETSI | imported from 3GU |
R1‑1803105 | void | ETSI | imported from 3GU |
R1‑1803106 | void | ETSI | imported from 3GU |
R1‑1803107 | void | ETSI | imported from 3GU |
R1‑1803108 | void | ETSI | imported from 3GU |
R1‑1803109 | void | ETSI | imported from 3GU |
R1‑180311 | - | - | - |
R1‑1803110 | void | ETSI | imported from 3GU |
R1‑1803111 | void | ETSI | imported from 3GU |
R1‑1803112 | void | ETSI | imported from 3GU |
R1‑1803113 | void | ETSI | imported from 3GU |
R1‑1803114 | void | ETSI | imported from 3GU |
R1‑1803115 | void | ETSI | imported from 3GU |
R1‑1803116 | void | ETSI | imported from 3GU |
R1‑1803117 | void | ETSI | imported from 3GU |
R1‑1803118 | void | ETSI | imported from 3GU |
R1‑1803119 | void | ETSI | imported from 3GU |
R1‑180312 | - | - | - |
R1‑1803120 | void | ETSI | imported from 3GU |
R1‑1803121 | void | ETSI | imported from 3GU |
R1‑1803122 | void | ETSI | imported from 3GU |
R1‑1803123 | void | ETSI | imported from 3GU |
R1‑1803124 | void | ETSI | imported from 3GU |
R1‑1803125 | void | ETSI | imported from 3GU |
R1‑1803126 | void | ETSI | imported from 3GU |
R1‑1803127 | void | ETSI | imported from 3GU |
R1‑1803128 | void | ETSI | imported from 3GU |
R1‑1803129 | void | ETSI | imported from 3GU |
R1‑180313 | - | - | - |
R1‑1803130 | void | ETSI | imported from 3GU |
R1‑1803131 | void | ETSI | imported from 3GU |
R1‑1803132 | void | ETSI | imported from 3GU |
R1‑1803133 | void | ETSI | imported from 3GU |
R1‑1803134 | void | ETSI | imported from 3GU |
R1‑1803135 | void | ETSI | imported from 3GU |
R1‑1803136 | void | ETSI | imported from 3GU |
R1‑1803137 | void | ETSI | imported from 3GU |
R1‑1803138 | void | ETSI | imported from 3GU |
R1‑1803139 | void | ETSI | imported from 3GU |
R1‑180314 | - | - | - |
R1‑1803140 | void | ETSI | imported from 3GU |
R1‑1803141 | void | ETSI | imported from 3GU |
R1‑1803142 | void | ETSI | imported from 3GU |
R1‑1803143 | void | ETSI | imported from 3GU |
R1‑1803144 | void | ETSI | imported from 3GU |
R1‑1803145 | void | ETSI | imported from 3GU |
R1‑1803146 | void | ETSI | imported from 3GU |
R1‑1803147 | void | ETSI | imported from 3GU |
R1‑1803148 | void | ETSI | imported from 3GU |
R1‑1803149 | void | ETSI | imported from 3GU |
R1‑180315 | - | - | - |
R1‑1803150 | void | ETSI | imported from 3GU |
R1‑1803151 | void | ETSI | imported from 3GU |
R1‑1803152 | void | ETSI | imported from 3GU |
R1‑1803153 | void | ETSI | imported from 3GU |
R1‑1803154 | void | ETSI | imported from 3GU |
R1‑1803155 | void | ETSI | imported from 3GU |
R1‑1803156 | void | ETSI | imported from 3GU |
R1‑1803157 | void | ETSI | imported from 3GU |
R1‑1803158 | void | ETSI | imported from 3GU |
R1‑1803159 | void | ETSI | imported from 3GU |
R1‑180316 | - | - | - |
R1‑1803160 | void | ETSI | imported from 3GU |
R1‑1803161 | void | ETSI | imported from 3GU |
R1‑1803162 | void | ETSI | imported from 3GU |
R1‑1803163 | void | ETSI | imported from 3GU |
R1‑1803164 | void | ETSI | imported from 3GU |
R1‑1803165 | void | ETSI | imported from 3GU |
R1‑1803166 | void | ETSI | imported from 3GU |
R1‑1803167 | void | ETSI | imported from 3GU |
R1‑1803168 | void | ETSI | imported from 3GU |
R1‑1803169 | void | ETSI | imported from 3GU |
R1‑180317 | - | - | - |
R1‑1803170 | void | ETSI | imported from 3GU |
R1‑1803171 | void | ETSI | imported from 3GU |
R1‑1803172 | void | ETSI | imported from 3GU |
R1‑1803173 | void | ETSI | imported from 3GU |
R1‑1803174 | void | ETSI | imported from 3GU |
R1‑1803175 | void | ETSI | imported from 3GU |
R1‑1803176 | void | ETSI | imported from 3GU |
R1‑1803177 | void | ETSI | imported from 3GU |
R1‑1803178 | void | ETSI | imported from 3GU |
R1‑1803179 | void | ETSI | imported from 3GU |
R1‑180318 | - | - | - |
R1‑1803180 | void | ETSI | imported from 3GU |
R1‑1803181 | void | ETSI | imported from 3GU |
R1‑1803182 | void | ETSI | imported from 3GU |
R1‑1803183 | void | ETSI | imported from 3GU |
R1‑1803184 | void | ETSI | imported from 3GU |
R1‑1803185 | void | ETSI | imported from 3GU |
R1‑1803186 | void | ETSI | imported from 3GU |
R1‑1803187 | void | ETSI | imported from 3GU |
R1‑1803188 | void | ETSI | imported from 3GU |
R1‑1803189 | void | ETSI | imported from 3GU |
R1‑1803190 | void | ETSI | imported from 3GU |
R1‑1803191 | void | ETSI | imported from 3GU |
R1‑1803192 | void | ETSI | imported from 3GU |
R1‑1803193 | void | ETSI | imported from 3GU |
R1‑1803194 | void | ETSI | imported from 3GU |
R1‑1803195 | void | ETSI | imported from 3GU |
R1‑1803196 | void | ETSI | imported from 3GU |
R1‑1803197 | void | ETSI | imported from 3GU |
R1‑1803198 | void | ETSI | imported from 3GU |
R1‑1803199 | void | ETSI | imported from 3GU |
R1‑1803200 | void | ETSI | imported from 3GU |
R1‑1803201 | void | ETSI | imported from 3GU |
R1‑1803202 | void | ETSI | imported from 3GU |
R1‑1803203 | void | ETSI | imported from 3GU |
R1‑1803204 | void | ETSI | imported from 3GU |
R1‑1803205 | void | ETSI | imported from 3GU |
R1‑1803206 | void | ETSI | imported from 3GU |
R1‑1803207 | void | ETSI | imported from 3GU |
R1‑1803208 | void | ETSI | imported from 3GU |
R1‑1803209 | void | ETSI | imported from 3GU |
R1‑1803210 | void | ETSI | imported from 3GU |
R1‑1803211 | void | ETSI | imported from 3GU |
R1‑1803212 | void | ETSI | imported from 3GU |
R1‑1803213 | void | ETSI | imported from 3GU |
R1‑1803214 | void | ETSI | imported from 3GU |
R1‑1803215 | void | ETSI | imported from 3GU |
R1‑1803216 | void | ETSI | imported from 3GU |
R1‑1803217 | void | ETSI | imported from 3GU |
R1‑1803218 | void | ETSI | imported from 3GU |
R1‑1803219 | void | ETSI | imported from 3GU |
R1‑180322 | - | - | - |
R1‑1803220 | void | ETSI | imported from 3GU |
R1‑1803221 | void | ETSI | imported from 3GU |
R1‑1803222 | void | ETSI | imported from 3GU |
R1‑1803223 | void | ETSI | imported from 3GU |
R1‑1803224 | void | ETSI | imported from 3GU |
R1‑1803225 | void | ETSI | imported from 3GU |
R1‑1803226 | void | ETSI | imported from 3GU |
R1‑1803227 | void | ETSI | imported from 3GU |
R1‑1803228 | void | ETSI | imported from 3GU |
R1‑1803229 | void | ETSI | imported from 3GU |
R1‑180323 | - | - | - |
R1‑1803230 | Correction on table-based TBS determination procedure | LG Electronics | imported from 3GU |
R1‑1803231 | On UL/DL resource allocation | Ericsson | imported from 3GU |
R1‑1803232 | Summary of 7.1.3.1.4 (DCI content) | Ericsson | imported from 3GU |
R1‑1803233 | Summary of 7.1.3.3.1 (Resource allocation) | Ericsson | imported from 3GU |
R1‑1803234 | On PUCCH Remaining Issues | Ericsson | imported from 3GU |
R1‑1803235 | Summary of Discussion for NR RRM measurements | Intel Corporation | imported from 3GU |
R1‑1803236 | Summary of Discussion for NR Radio Link Monitoring | Intel Corporation | imported from 3GU |
R1‑1803237 | Summary of RAN1#92 Tdocs on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1803238 | On Delta_TF for PUCCH Power Control | Samsung | imported from 3GU |
R1‑1803239 | Summary of NR UL Power Control - CA aspects | Samsung | imported from 3GU |
R1‑180324 | - | - | - |
R1‑1803240 | Summary on CA Aspects | Samsung | imported from 3GU |
R1‑1803241 | Remaining details on synchronization signal design | Qualcomm Incorporated | imported from 3GU |
R1‑1803242 | Summary of 7.1.1.2.3 Other system information delivery | Samsung | imported from 3GU |
R1‑1803243 | Maintenance for CSI reporting | Qualcomm Incorporated | imported from 3GU |
R1‑1803244 | Summary of SRS | Sony | imported from 3GU |
R1‑1803245 | Feature lead summary 1 of PT-RS | Ericsson | imported from 3GU |
R1‑1803246 | Remaining details of SS/PBCH block | Intel Corporation | imported from 3GU |
R1‑1803247 | Text proposal on power prioritization for slot/subslot operation in CA scenario | Ericsson, LG Electronics | imported from 3GU |
R1‑1803248 | Text proposal on 1ms HARQ bits inclusion in a slot/subslot transmission | Ericsson, LG Electronics | imported from 3GU |
R1‑1803249 | Text proposal on SPS validation for short TTI | Ericsson | imported from 3GU |
R1‑180325 | - | - | - |
R1‑1803250 | Text proposal on HARQ-ACK reporting for short TTI and shortened processing time | Ericsson | imported from 3GU |
R1‑1803251 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1803252 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1803253 | Offline summary for Al 7.1.1.3 on Paging | Huawei | imported from 3GU |
R1‑1803254 | Summary of PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803255 | CSI framework simplification | Ericsson | imported from 3GU |
R1‑1803256 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1803257 | Remaining issues on UCI multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1803258 | Summary of Contributions on PUCCH structure in short-duration | Ericsson | imported from 3GU |
R1‑1803259 | On Channel Access Study for 6 GHz | Ericsson | imported from 3GU |
R1‑180326 | - | - | - |
R1‑1803260 | Feature lead summary 1 on beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1803261 | On A-CSI reporting for NR | Sharp | imported from 3GU |
R1‑1803262 | On A-CSI reporting in CA | Sharp | imported from 3GU |
R1‑1803263 | Calibration results of Indoor Hotspot – eMBB for ITU self-evaluation | Sharp | imported from 3GU |
R1‑1803264 | Remaining details of PDCCH search spaces and CORESETs | Intel Corporation | imported from 3GU |
R1‑1803265 | Remaining details on UE processing times and HARQ operation | Intel Corporation | imported from 3GU |
R1‑1803266 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1803267 | Summary of CSI reporting v1 | Ericsson | imported from 3GU |
R1‑1803268 | Open issues in 38.331 related to RAN1 | Ericsson | imported from 3GU |
R1‑1803269 | Merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑180327 | - | - | - |
R1‑1803270 | Contribution summary and offline discussion plan for GC-PDCCH carrying SFI | Qualcomm | imported from 3GU |
R1‑1803271 | Remaining issues on PT-RS | CATT | imported from 3GU |
R1‑1803272 | Draft TR skeleton for TR.38.889 | Qualcomm | imported from 3GU |
R1‑1803273 | Remaining issues on non-codebook based UL transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1803274 | Remaining issues on soft buffer management | Qualcomm | imported from 3GU |
R1‑1803275 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1803276 | Compact DCI design for URLLC | Huawei, HiSilicon | imported from 3GU |
R1‑1803277 | WF on Additional Periodicities for CSI-RS for Mobility | ZTE, Sanechips, Orange, CMCC | imported from 3GU |
R1‑1803278 | Remaining Issue on Type II CSI Omission: Reciprocity Based Payload Prediction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803279 | Multiple CSI reports for eCA | Qualcomm Incorporated, Huawei, HiSilicon | imported from 3GU |
R1‑180328 | - | - | - |
R1‑1803280 | Summary of CSI measurement | ZTE | imported from 3GU |
R1‑1803281 | WF on group based beam reporting | ZTE | imported from 3GU |
R1‑1803282 | Summary for Al 7.1.6.1 NR UL power control in non CA aspects | ZTE | imported from 3GU |
R1‑1803283 | On TBS determination procedure | ZTE, Sanechips | imported from 3GU |
R1‑1803284 | Summary of multiplexing data with different transmission durations | vivo | imported from 3GU |
R1‑1803285 | Summary of open issues related to rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803286 | Summary of PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803287 | Summary of RMSI CORESET Configuration for 10 MHz min CH BW with 15 kHz SS SCS | Samsung | imported from 3GU |
R1‑1803288 | Summary of PDCCH DMRS Sequence | Samsung | imported from 3GU |
R1‑1803289 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑180329 | - | - | - |
R1‑1803290 | On beam management issues for multi-CC operation | Intel Corporation | imported from 3GU |
R1‑1803291 | WF on issues for SR/SPS periodicity configuration | ZTE, Sanechips, CMCC | imported from 3GU |
R1‑1803292 | Summary of PRB bundling for DL | vivo | imported from 3GU |
R1‑1803293 | Feature lead summary 1 of the remaining issues for RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1803294 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1803295 | Offline summary for AI 7.1.3.3.4 UL data transmission procedure | NTT DOCOMO | imported from 3GU |
R1‑1803296 | Summary of CSI reporting v2 | Ericsson | imported from 3GU |
R1‑1803297 | Summary of remaining issues on CBG based retransmission | LG Electronics | imported from 3GU |
R1‑1803298 | Offline summary for AI 7.1.3.1.1 PDCCH structure | NTT DOCOMO | imported from 3GU |
R1‑1803299 | Offline summary for AI 7.1.3.1.2 Search space | NTT DOCOMO | imported from 3GU |
R1‑180330 | - | - | - |
R1‑1803300 | Offline Summary on CA Aspects | Samsung | imported from 3GU |
R1‑1803301 | Summary of CSI reporting v3 | Ericsson | imported from 3GU |
R1‑1803302 | Early contention resolution in NB-IoT | RAN2, Qualcomm | imported from 3GU |
R1‑1803303 | Summary for CQI and MCS | AT&T | imported from 3GU |
R1‑1803304 | Summary for TRS | MediaTek | imported from 3GU |
R1‑1803305 | WF on SRS frequency position | ZTE, Sanechips | imported from 3GU |
R1‑1803306 | Summary of issues on UL non-codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803307 | V2X path loss and shadowing | Huawei, HiSilicon | imported from 3GU |
R1‑1803308 | Group re-ordering of new CGS | Huawei, HiSilicon | imported from 3GU |
R1‑1803309 | Draft TR 37.885 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | LG Electronics | imported from 3GU |
R1‑180331 | - | - | - |
R1‑1803310 | Blind detection ambiguity for DCI | Huawei, HiSilicon | imported from 3GU |
R1‑1803311 | Summary for Remaining issues on Beam Failure Recovery | MediaTek | imported from 3GU |
R1‑1803312 | MCS/CQI design for URLLC transmission | Huawei, HiSilicon | imported from 3GU |
R1‑1803313 | Reply LS to RAN1 on wake-up signal | RAN2, Huawei | imported from 3GU |
R1‑1803314 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1803315 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1803316 | WF on CSI-RS sequence mapping | Ericsson, Qualcomm, CATT, NEC | imported from 3GU |
R1‑1803317 | Way forward on candidate spectrum for NR unlicensed operation | Intel | imported from 3GU |
R1‑1803318 | Draft LS on introducing of LTE UE DL CAT 21 for 1.4Gbps in Rel.14 | HiSilicon | imported from 3GU |
R1‑1803319 | Summary of offline discussion on link-level simulation assumptions for NOMA | ZTE, SaneChips | imported from 3GU |
R1‑180332 | - | - | - |
R1‑1803320 | Feature lead summary #1 of CSI-RS | Huawei, HiSilicon | imported from 3GU |
R1‑1803321 | Offline Discussion Summary on Codebook Based UL Transmission | Intel Corporation | imported from 3GU |
R1‑1803322 | Summary of [91-NR-18] Email discussion on evaluation methodology for eV2X | LG Electronics | imported from 3GU |
R1‑1803323 | Summary of Remaining Issues in DMRS | Qualcomm | imported from 3GU |
R1‑1803324 | Summary of Contributions on PUCCH structure in short-duration | Ericsson | imported from 3GU |
R1‑1803325 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1803326 | WF on Clarification of CSI-RS usages: | LG Electronics, Qualcomm, MediaTek, NTT DOCOMO, OPPO | imported from 3GU |
R1‑1803327 | WF on simulation methodology for NR-Unlicensed | Qualcomm | imported from 3GU |
R1‑1803328 | Summary of QCL | Nokia | imported from 3GU |
R1‑1803329 | Draft skeleton of TR 38.812 (NOMA) | ZTE, Sanechips | imported from 3GU |
R1‑180333 | - | - | - |
R1‑1803330 | LS on UE feature list | RAN4, NTT DOCOMO | imported from 3GU |
R1‑1803331 | Way forward on UL DCI-Triggered CSIRS resource set for tracking | Qualcomm | imported from 3GU |
R1‑1803332 | Summary of remaining issues for UCI piggyback on PUSCH | Qualcomm | imported from 3GU |
R1‑1803333 | Feature lead summary 2 of PT-RS | Ericsson | imported from 3GU |
R1‑1803334 | Summary of Remaining Issues in DMRS | Qualcomm | imported from 3GU |
R1‑1803335 | [Draft] Input values for calculating the RA-RNTI | Ericsson | imported from 3GU |
R1‑1803336 | Offline discussion summary on GC-PDCCH | Qualcomm | imported from 3GU |
R1‑1803337 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1803338 | LS on LTE peak data-rate calculation for EN-DC | RAN2, Intel | imported from 3GU |
R1‑1803339 | Offline session notes for CSI reporting | Ericsson | imported from 3GU |
R1‑180334 | - | - | - |
R1‑1803340 | Summary of off line discussion on NR to support Non-Terrestrial | Thales | imported from 3GU |
R1‑1803341 | WF on default beam indication | LG Electronics | imported from 3GU |
R1‑1803342 | Frequency hop level base sequence hopping | NTT DOCOMO | imported from 3GU |
R1‑1803343 | RAN1 open issues based on merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑1803344 | WF on issues for SR/SPS periodicity configuration | ZTE, Sanechips, CMCC, Qualcomm Incorporated, DoCoMo, CATT, vivo, CATR, Orange | imported from 3GU |
R1‑1803345 | Offline Discussion on CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑1803346 | Feature lead summary 2 on beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1803347 | nn | Samsung | imported from 3GU |
R1‑1803348 | nn | Samsung | imported from 3GU |
R1‑1803349 | nn | Samsung | imported from 3GU |
R1‑180335 | - | - | - |
R1‑1803350 | nn | Samsung | imported from 3GU |
R1‑1803351 | nn | Samsung | imported from 3GU |
R1‑1803352 | Summary of Discussion for NR RRM measurements | Intel Corporation | imported from 3GU |
R1‑1803353 | Summary of Discussion for NR Radio Link Monitoring | Intel Corporation | imported from 3GU |
R1‑1803354 | DRAFT Reply LS on Raster Configuration | Intel, MediaTek | imported from 3GU |
R1‑1803355 | DRAFT Reply LS on formula or table for L1 data rate | Intel | imported from 3GU |
R1‑1803356 | Offline summary for Al 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1803357 | Summary of 7.2.2 Study of necessity of a new DCI format | Huawei | imported from 3GU |
R1‑1803358 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1803359 | Summary of handling UL multiplexing of transmission with different reliability requirements | vivo | imported from 3GU |
R1‑180336 | - | - | - |
R1‑1803360 | Reply LS to RAN1 on early data transmission | RAN2, Huawei | imported from 3GU |
R1‑1803361 | Summary of 7.2.3 Study of necessity of PDCCH repetition | Qualcomm | imported from 3GU |
R1‑1803362 | Summary on Remaing issues on Beam Failure Recovery | MediaTek | imported from 3GU |
R1‑1803363 | WF on CSI-RS sequence | Samsung, InterDigital, Huawei, HiSilicon, vivo | imported from 3GU |
R1‑1803364 | LS on introducing of LTE UE DL CAT 21 for 1.4Gbps in Rel.14 | RAN1, HiSilicon | imported from 3GU |
R1‑1803365 | [Draft]LS on maximum TBS for PDSCH containing RMSI/OSI/Paging | CATT | imported from 3GU |
R1‑1803366 | Remaining issues for long PUCCH | Qualcomm Incorporated | imported from 3GU |
R1‑1803367 | WF on beam failure recovery | CATT | imported from 3GU |
R1‑1803368 | Draft reply LS to RAN2 on beam failure recovery | CATT | imported from 3GU |
R1‑1803369 | Outcome of offline discussion of 7.1.3.1.4 (DCI content) | Ericsson | imported from 3GU |
R1‑180337 | - | - | - |
R1‑1803370 | Summary of email discussion on beam failure recovery on Scell | CATT | imported from 3GU |
R1‑1803371 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1803372 | Input values for calculating the RA-RNTI | RAN1, Ericsson | imported from 3GU |
R1‑1803373 | LS on introducing of LTE UE DL CAT 21 for 1.4Gbps in Rel.14 | RAN1, HiSilicon | imported from 3GU |
R1‑1803374 | LS to RAN1 on handling parallel RA procedure and SR procedure | RAN2, ASUSTeK | imported from 3GU |
R1‑1803375 | LS on maximum TBS for PDSCH containing RMSI/OSI/Paging | RAN1, CATT | imported from 3GU |
R1‑1803376 | [DRAFT] reply LS on PHR | NTT DOCOMO | imported from 3GU |
R1‑1803377 | Draft LS on MAC CEs for BM and CSI | Huawei | imported from 3GU |
R1‑1803378 | Summary of PRB bundling for DL | vivo | imported from 3GU |
R1‑1803379 | Reply LS on Raster Configuration | RAN1, Intel, MediaTek | imported from 3GU |
R1‑180338 | - | - | - |
R1‑1803380 | Offline discussion summary on eV2X evaluation methodology | LG Electronics | imported from 3GU |
R1‑1803381 | Summary of SRS | Sony | imported from 3GU |
R1‑1803382 | RAN1 open issues based on merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑1803383 | Draft LS on L1 parameters | Ericsson | imported from 3GU |
R1‑1803384 | Feature lead summary 3 of PT-RS | Ericsson | imported from 3GU |
R1‑1803385 | LS on messagePowerOffsetGroupB | RAN2, Ericsson | imported from 3GU |
R1‑1803386 | Summary of offline discussion for IMT-2020 self evaluation | Huawei | imported from 3GU |
R1‑1803387 | List of RAN1 agreements with ASN.1 impact | Ericsson | imported from 3GU |
R1‑1803388 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1803389 | Summary of PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑180339 | - | - | - |
R1‑1803390 | Remaining issues for 7.1.3.3.4 | NTT DOCOMO | imported from 3GU |
R1‑1803391 | Partial overlapping AN and SR PUCCH ressources | Ericsson | imported from 3GU |
R1‑1803392 | WF on V2X Sidelink Channel Modeling | Huawei, HiSilicon, Qualcomm, ZTE, Sanechips, Fraunhofer HHI, Intel, Cohere Technologies, InterDigital, NTT Docomo, Vodafone, LGE, NEC, General Motors, CATT | imported from 3GU |
R1‑1803393 | Outcome of offline session on RACH and DCI | Ericsson | imported from 3GU |
R1‑1803394 | TP for 38.211 from agenda point 7.1.3.3.1 | Ericsson | imported from 3GU |
R1‑1803395 | TP for 38.212 from agenda point 7.1.3.3.1 | Ericsson | imported from 3GU |
R1‑1803396 | TP for 38.214 from agenda point 7.1.3.3.1 | Ericsson | imported from 3GU |
R1‑1803397 | Summary of email discussion on beam failure recovery on Scell | CATT | imported from 3GU |
R1‑1803398 | LS reply on beam failure recovery | RAN1, CATT | imported from 3GU |
R1‑1803399 | Summary of Offline Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑180340 | - | - | - |
R1‑1803400 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel | imported from 3GU |
R1‑1803401 | Open issues in 38.331 related to RAN1 | Ericsson | imported from 3GU |
R1‑1803402 | Offline summary for Al 7.1.6.1 NR UL power control in non-CA aspects | ZTE | imported from 3GU |
R1‑1803403 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1803404 | Draft LS on RMSI CORESET configuration for supporting new SSB SCS and minimum CH BW conbination | CATT | imported from 3GU |
R1‑1803405 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1803406 | Updated summary of CSI measurement | ZTE | imported from 3GU |
R1‑1803407 | Updates on QCL parameters in TCI | ZTE, Sanechips | imported from 3GU |
R1‑1803408 | Summary of bandwidth part remaining issues | MediaTek | imported from 3GU |
R1‑1803409 | Second Offline Summary on CA Aspects | Samsung | imported from 3GU |
R1‑180341 | - | - | - |
R1‑1803410 | Summary of SRS | Sony | imported from 3GU |
R1‑1803411 | Summary of issues on UL non-codebook based transmission | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803412 | Summary of offline discussion on link-level simulation assumptions for NOMA | ZTE, SaneChips | imported from 3GU |
R1‑1803413 | Summary of 7.2.2 Study of necessity of a new DCI format | Huawei, HiSilicon | imported from 3GU |
R1‑1803414 | Further proposals on QCL | Nokia | imported from 3GU |
R1‑1803415 | Proposal related to Non-Terrestrial network channel model for decision | Thales, HNS, ESA, SES, Fraunhofer HHI, Dish network, Pivotal commware | imported from 3GU |
R1‑1803416 | NR-NTN Channel Modeling – work plan | Thales, CNES, HNS | imported from 3GU |
R1‑1803417 | Feature lead summary 3 on beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1803418 | WF on UE capability on CSI reporting and relaxation | LG Electronics | imported from 3GU |
R1‑1803419 | Offline session notes 2 for CSI reporting | Ericsson | imported from 3GU |
R1‑180342 | - | - | - |
R1‑1803420 | Revised TP on LTE-NR power sharing | Ericsson | imported from 3GU |
R1‑1803421 | LS to RAN1 on CP latency | RAN2, Ericsson | imported from 3GU |
R1‑1803422 | RAN1 open issues based on merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑1803423 | Draft LS on L1 parameters | Ericsson | imported from 3GU |
R1‑1803424 | List of RAN1 agreements with ASN.1 impact | Ericsson | imported from 3GU |
R1‑1803425 | Open issues in 38.331 related to RAN1 | Ericsson | imported from 3GU |
R1‑1803426 | Summary of open issues related to rate-matching in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803427 | WF on UL PT-RS power boosting factor | LG Electronics | imported from 3GU |
R1‑1803428 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1803429 | [draft] LS on Power Transition and Uplink Channel and Reference Signal Combinations | Intel | imported from 3GU |
R1‑180343 | - | - | - |
R1‑1803430 | Summary of Contributions on PUCCH structure in short-duration | Ericsson | imported from 3GU |
R1‑1803431 | Partial overlapping AN and SR PUCCH resources | Ericsson | imported from 3GU |
R1‑1803432 | Summary of 7.1.1.1 Synchronization signal | Ericsson | imported from 3GU |
R1‑1803433 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1803434 | Way forward on UL DCI-Triggered CSIRS resource set for tracking | Qualcomm | imported from 3GU |
R1‑1803435 | [Draft] LS on RAR | Ericsson | imported from 3GU |
R1‑1803436 | Offline outcome of search space | NTT DOCOMO | imported from 3GU |
R1‑1803437 | Proposal for PDCCH scrambling | NTT DOCOMO | imported from 3GU |
R1‑1803438 | Summary #2 for TRS | MediaTek | imported from 3GU |
R1‑1803439 | Offline Discussion on CQI and MCS table(s) for URLLC | Ericsson | imported from 3GU |
R1‑180344 | - | - | - |
R1‑1803440 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1803441 | Summary 2 on Remaining issues on Beam Failure Recovery | MediaTek | imported from 3GU |
R1‑1803442 | Offline discussion summary for NR-unlicensed | Qualcomm | imported from 3GU |
R1‑1803443 | draft LS on TR38.811 Chapter 6 skeleton | Thales | imported from 3GU |
R1‑1803444 | LS on TR38.811 Chapter 6 skeleton | RAN1, Thales | imported from 3GU |
R1‑1803445 | WF on V2X Sidelink Channel Modeling | Huawei, HiSilicon, Qualcomm, ZTE, Sanechips, Fraunhofer HHI, Intel, Cohere Technologies, InterDigital, NTT Docomo, Vodafone, LGE, NEC, General Motors, CATT, ITRI, AT&T, Spirent | imported from 3GU |
R1‑1803446 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1803447 | Draft LS on SRS Switching | Qualcomm | imported from 3GU |
R1‑1803448 | Implementation of the minimum PxSCH duration agreements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803449 | Draft time domain resource allocation proposal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑180345 | - | - | - |
R1‑1803450 | Summary of PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803451 | Performance Analysis between existing PF0 mapping and improved mapping for SR and A/N | Huawei | imported from 3GU |
R1‑1803452 | Text Proposals for TS38.211 related to PT-RS | Ericsson | imported from 3GU |
R1‑1803453 | Text Proposals for TS38.214 related to PT-RS | Ericsson | imported from 3GU |
R1‑1803454 | WF on antenna port mapping | CATT | imported from 3GU |
R1‑1803455 | Re-ordering of new CGS | Huawei, HiSilicon, ZTE, Sanechips | imported from 3GU |
R1‑1803456 | Draft LS on RMSI CORESET configuration for supporting new SSB SCS and minimum CH BW conbination | CATT | imported from 3GU |
R1‑1803457 | WF on PT-RS threshold sets | Samsung | imported from 3GU |
R1‑1803458 | WF on PT-RS port association | Intel | imported from 3GU |
R1‑1803459 | Chairman's notes of AI 7.6 ^^Study on NR-based Access to Unlicensed Spectrm | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑180346 | - | - | - |
R1‑1803460 | Chairman's notes of AI 7.1.7 on NR - UE features | Ad-hoc chair (NTT DOCOMO, AT&T) | imported from 3GU |
R1‑1803461 | Chairman's notes of AI 7.1.5 NR-LTE co-existence | Ad-Hoc chair (Ericsson) | imported from 3GU |
R1‑1803462 | Chairman's notes of AI 7.1.2 NR MIMO | Ad-Hoc chair (Samsung) | imported from 3GU |
R1‑1803463 | Chairman's notes of AI 7.1.6 UL Power control | Ad-Hoc chair (Samsung) | imported from 3GU |
R1‑1803464 | Chairman's notes of AI 7.1.4 Channel coding | Ad-hoc chair (Ericsson) | imported from 3GU |
R1‑1803465 | Offline outcome for PDCCH structure | NTT DOCOMO | imported from 3GU |
R1‑1803466 | Offline outcome of search space | NTT DOCOMO | imported from 3GU |
R1‑1803467 | WF on EN-DC case 1 HARQ timing | Huawei | imported from 3GU |
R1‑1803468 | Summary of 7.1.1.2.3 Other system information delivery | Samsung | imported from 3GU |
R1‑1803469 | LS on RMSI CORESET configuration for supporting new SSB SCS and minimum CH BW conbination | RAN1, CATT | imported from 3GU |
R1‑180347 | - | - | - |
R1‑1803470 | Summary of DL/UL scheduling and HARQ management | Qualcomm | imported from 3GU |
R1‑1803471 | Proposals for 7.1.3.3.4 | NTT DOCOMO | imported from 3GU |
R1‑1803472 | WF on antenna port mapping | CATT, ZTE, Qualcomm, LGE, OPPO, CMCC | imported from 3GU |
R1‑1803473 | Draft Reply LS on Clarifications in MAC (DELTA_PREAMBLE) | Ericsson | imported from 3GU |
R1‑1803474 | [DRAFT] LS on time domain resource allocation | Nokia | imported from 3GU |
R1‑1803475 | LS on RAR | RAN1, Ericsson | imported from 3GU |
R1‑1803476 | Initial considerations on impact assessment to NR protocol to support Non-Terrestrial networks | Thales | imported from 3GU |
R1‑1803477 | WF on Delta_PUCCH_TF for NR PUCCH power control | Samsung, CATT | imported from 3GU |
R1‑1803478 | NR UE features list | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1803479 | draft LS on NR UE features list | NTT DOCOMO, AT&T | imported from 3GU |
R1‑180348 | - | - | - |
R1‑1803480 | LS on NR UE features list | RAN1, NTT DOCOMO, AT&T | imported from 3GU |
R1‑1803481 | Feature lead summary 4 on beam measurement and reporting | Ericsson | imported from 3GU |
R1‑1803482 | Text proposal on beam group reporting | Ericsson | imported from 3GU |
R1‑1803483 | Text proposal on antenna port quasi co-location | Ericsson | imported from 3GU |
R1‑1803484 | Summary of Remaining details on PRACH formats | Convida Wireless | imported from 3GU |
R1‑1803485 | Approximate Peak Data Rate and Scaling Factor Use Cases | Intel | imported from 3GU |
R1‑1803486 | Summary of Offline Discussion for NR RRM measurements | Intel | imported from 3GU |
R1‑1803487 | Summary of Offline Discussion for NR Radio Link Monitoring | Intel | imported from 3GU |
R1‑1803488 | Feature lead summary 2 of the remaining issues for RS multiplexing | Huawei, HiSilicon | imported from 3GU |
R1‑1803489 | Partial overlapping AN and SR PUCCH resources | Ericsson | imported from 3GU |
R1‑180349 | - | - | - |
R1‑1803490 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1803491 | RAN1 open issues based on merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑1803492 | List of RAN1 agreements with ASN.1 impact | Ericsson | imported from 3GU |
R1‑1803493 | Open issues in 38.331 related to RAN1 | Ericsson | imported from 3GU |
R1‑1803494 | Summary of TA related aspects | Panasonic | imported from 3GU |
R1‑1803495 | Text proposal on CSI-RS for tracking | Ericsson | imported from 3GU |
R1‑1803496 | LS response to RAN1 on NR MIMO MAC CE | RAN2, Huawei | imported from 3GU |
R1‑1803497 | Offline discussion summary for NR-unlicensed | Qualcomm | imported from 3GU |
R1‑1803498 | Offline discussion summary on GC-PDCCH | Qualcomm | imported from 3GU |
R1‑1803499 | Draft text proposal to 38.214 subclause 5.3 and 6.4 on UE PDSCH processing time | Qualcomm, Nokia | imported from 3GU |
R1‑180350 | - | - | - |
R1‑1803500 | Draft text proposal to 38.214 subclause 5.3 and 6.4 on UE PDSCH processing time in the case of CA | Qualcomm | imported from 3GU |
R1‑1803501 | Draft text proposal to 38.214 subclause 5.3 on UE PDSCH processing time in the case of short PDSCH type A | Qualcomm | imported from 3GU |
R1‑1803502 | WF on PDSCH/PUCCH DMRS position | Samsung | imported from 3GU |
R1‑1803503 | Corrections for Single Antenna Port Operation in DCI Format 0_1 | Ericsson | imported from 3GU |
R1‑1803504 | Draft time domain resource allocation proposal | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803505 | Updated summary of CSI measurement | ZTE | imported from 3GU |
R1‑1803506 | Summary of Potential Solutions for RMSI CORESET Configuration for Band n41 | Samsung | imported from 3GU |
R1‑1803507 | NR-NTN: Paging in NGSO Satellite Systems | Hughes | imported from 3GU |
R1‑1803508 | [DRAFT] LS on Simultaneous PDSCH Reception with Paging | Qualcomm | imported from 3GU |
R1‑1803509 | [DRAFT] LS on UE HARQ Capability | Qualcomm | imported from 3GU |
R1‑180351 | - | - | - |
R1‑1803510 | LS on time domain resource allocation | RAN1, Nokia | imported from 3GU |
R1‑1803511 | Summary of 7.1.1.2.1 NR-PBCH | Ericsson | imported from 3GU |
R1‑1803512 | TP on sync raster indication | Qualcomm | imported from 3GU |
R1‑1803513 | NR UE features list | NTT DOCOMO, AT&T | imported from 3GU |
R1‑1803514 | Summary of offline discussion on PUCCH resource allocation | OPPO | imported from 3GU |
R1‑1803515 | Proposed TP for the agreements in 7.1.3.1.3 | Qualcomm | imported from 3GU |
R1‑1803516 | Summary of Offline Discussion on RMSI | CATT | imported from 3GU |
R1‑1803517 | TP for synchronization raster indication | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803518 | Outcome from offline session on DCI sizes | Ericsson | imported from 3GU |
R1‑1803519 | LS on System acquisition time reduction for Rel-15 NB-IoT and eMTC | RAN1, LG Electronics | imported from 3GU |
R1‑180352 | - | - | - |
R1‑1803520 | RAN1 open issues based on merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑1803521 | List of RAN1 agreements with ASN.1 impact | Ericsson | imported from 3GU |
R1‑1803522 | LS to RAN1 on Beam- and Cell- Radio-Link-Monitoring | RAN2, Nokia | imported from 3GU |
R1‑1803523 | Updated summary of CSI measurement | ZTE | imported from 3GU |
R1‑1803524 | Summary of remaining details on RACH procedure | Qualcomm | imported from 3GU |
R1‑1803525 | TP for 38.300 on RMSI | Nokia, Nokia Shanghai Bell | imported from 3GU |
R1‑1803526 | Discussion on Simultaneous PDSCH Reception | Qualcomm | imported from 3GU |
R1‑1803527 | Summary of PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803528 | Text Proposals on Codebook Based UL Transmission | Intel | imported from 3GU |
R1‑1803529 | List of RAN1 agreements with ASN.1 impact | Ericsson | imported from 3GU |
R1‑180353 | - | - | - |
R1‑1803530 | LS on L1 parameters | RAN1, Ericsson | imported from 3GU |
R1‑1803531 | Partial overlapping of PUCCH resources | Ericsson | imported from 3GU |
R1‑1803532 | Way forward on UL DCI-Triggered CSIRS resource set for tracking | Qualcomm | imported from 3GU |
R1‑1803533 | Discussion on Simultaneous PDSCH Reception | Qualcomm | imported from 3GU |
R1‑1803534 | Summary of PUCCH structure in long-duration | Huawei, HiSilicon | imported from 3GU |
R1‑1803535 | RAN1 open issues based on merged correction on L1 parameters for EN-DC 38.331 | Ericsson | imported from 3GU |
R1‑1803536 | [DRAFT] LS on Simultaneous PDSCH Reception with System Information | Qualcomm | imported from 3GU |
R1‑1803537 | LS on Simultaneous PDSCH Reception with Paging | RAN1, Qualcomm | imported from 3GU |
R1‑1803538 | LS on UE HARQ Capability | RAN1, Qualcomm | imported from 3GU |
R1‑1803539 | [draft]Reply LS on Clarifications in MAC (BWP inactivity timer) | MediaTek | imported from 3GU |
R1‑180354 | - | - | - |
R1‑1803540 | Reply LS on Clarifications in MAC (BWP inactivity timer) | RAN1, MediaTek | imported from 3GU |
R1‑1803541 | LS on Simultaneous PDSCH Reception with System Information | RAN1, Qualcomm | imported from 3GU |
R1‑1803542 | Two alternatives to split encoded UCI bits between two PUSCH hops | LG Electronics | imported from 3GU |
R1‑1803543 | draftCR to 38.211 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Ericsson | imported from 3GU |
R1‑1803544 | draftCR to 38.212 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Huawei | imported from 3GU |
R1‑1803545 | draftCR to 38.213 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Samsung | imported from 3GU |
R1‑1803546 | draftCR to 38.214 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Nokia | imported from 3GU |
R1‑1803547 | draftCR to 38.215 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Intel | imported from 3GU |
R1‑1803548 | draftCR to 38.202 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Qualcomm | imported from 3GU |
R1‑1803549 | LS on SRS switching | RAN1, Qualcomm | imported from 3GU |
R1‑180355 | - | - | - |
R1‑1803550 | Inter-RAT measurements of NR | Ericsson | imported from 3GU |
R1‑1803551 | CR to 38.202 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Qualcomm | imported from 3GU |
R1‑1803552 | CR to 38.211 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Ericsson | imported from 3GU |
R1‑1803553 | CR to 38.212 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Huawei | imported from 3GU |
R1‑1803554 | CR to 38.213 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Samsung | imported from 3GU |
R1‑1803555 | CR to 38.214 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Nokia | imported from 3GU |
R1‑1803556 | CR to 38.215 capturing the Jan18 ad-hoc and RAN1#92 meeting agreements | Intel | imported from 3GU |
page generated from database: 2024-07-20 12:15:34