Agenda with allocated Tdocs

Created: 2011-05-18 13:52     Last document: C1-112332

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening
2
Agenda and reports
C1-111531 agenda CT1 Chairman agenda information Yes Yes noted No
    C1-111539 draft C1-70 report MCC meeting report / action list approval Yes Yes approved No
3
Input liaison statements
C1-111622 LS on Addressing and Identification on XCAP (C4-110961) CT4 i/c LS information Yes Yes noted No
    C1-111623 LS on Router Advertisement for idle mode UE (C4-111015) CT4 i/c LS information Yes Yes noted No
    C1-111624 LS on excessive updates of NAS security context (C6-110184) CT6 i/c LS action Yes Yes noted No
    C1-111625 LS Response to LS eCall Testing Deliverables (GP-110012) GERAN3 i/c LS information Yes Yes noted No
    C1-111626 LS on Release 10 NIMTC Work (GP-110382) GERAN i/c LS information Yes Yes noted No
    C1-111627 LS on Fast Downlink Frequency Switching capability (GP-110387) GERAN i/c LS action Yes Yes noted No
    C1-111628 Reply LS on Cell Broadcast Service for MOCN Shared Network (GP-110501) GERAN2 i/c LS information Yes Yes noted No
    C1-111629 LS on Management of MOCN supporting MSs/UEs in GERAN (GP-110518) GERAN i/c LS information Yes Yes noted No
    C1-111630 Reply LS on LTE UE IMS emergency call support in Rel-9 and later (R2-112589) RAN2 i/c LS information Yes Yes noted No
    C1-111631 SR-VCC from LTE to UMTS (R2-112624) RAN2 i/c LS action Yes Yes replied to No
    C1-111632 LS on PLMN and CSG whitelist handling in H(e)NB (R2-112637) RAN2 i/c LS action Yes Yes replied to No
    C1-111633 Reply LS on PS domain signalling congestion control for UMTS with NMO II (R2-112639) RAN2 i/c LS information Yes Yes noted No
    C1-111634 Reply LS on maximum value of extended wait timer (R2-112644) RAN2 i/c LS information Yes Yes noted No
    C1-111635 Reply LS on Security for LTE relay nodes (R3-111034) RAN3 i/c LS information Yes Yes noted No
    C1-111636 LS on Number of emergency numbers allowed in IE Emergency number list (R5-110802) RAN5 i/c LS action Yes Yes replied to No
    C1-111637 LS on Automatic re-attach following TAU reject or Service Request reject (R5-110835) RAN5 i/c LS action Yes Yes replied to No
    C1-111638 Reply LS to MSG on eCall testing deliverables (R5-110880) RAN5 i/c LS information Yes Yes noted No
    C1-111641 Reply LS on MSC server assisted mid-call feature (S2-111152) SA2 i/c LS information Yes Yes noted No
    C1-111642 Reply LS on Simultaneous registration of a single private identity from different Ues (S2-111153) SA2 i/c LS information Yes Yes noted No
    C1-111643 Reply LS on identifying sessions targeted for access transfer (S2-111154) SA2 i/c LS information Yes Yes noted No
    C1-111644 LS reply on GBR and MBR definition (S2-111180) SA2 i/c LS information Yes Yes noted No
    C1-111645 LS reply on Applicability of Handover restriction list for CSFB (S2-11181) SA2 i/c LS information Yes Yes noted No
    C1-111646 LS reply on SGs association removal (S2-111183) SA2 i/c LS information Yes Yes noted No
    C1-111647 LS on PS domain signalling congestion control for UMTS with NMO II (S2-111205) SA2 i/c LS information Yes Yes noted No
    C1-111648 Reply LS on CN node selection (S2-111207) SA2 i/c LS information Yes Yes noted No
    C1-111649 Reply LS on Bearer Control Mode and multiple PDN connectivity (S2-111237) SA2 i/c LS information Yes Yes noted No
    C1-111650 LS on SGs paging with IMSI for CSFB (S2-111245) SA2 i/c LS action Yes Yes replied to No
    C1-111651 Reply LS on “Quality of Service requirements and objectives for wireless access systems” (S2-111261) SA2 i/c LS information Yes Yes noted No
    C1-111652 LS on Transfer of SPID during (inter-RAT) handover (S2-111267) SA2 i/c LS information Yes Yes noted No
    C1-111653 Reply LS on Cell Broadcast Service for MOCN Shared Network (S2-111272) SA2 i/c LS action Yes Yes noted No
    C1-111654 Reply LS on applicability of the extended wait time per CN domain (S2-112012) SA2 i/c LS information Yes Yes replied to No
    C1-111655 Reply LS on Router Advertisement for idle mode UE (S2-112059) SA2 i/c LS information Yes Yes noted No
    C1-111656 Reply LS on Clarification on APN congestion and Low Access Priority Indicator handling (S2-112143) SA2 i/c LS information Yes Yes noted No
    C1-111657 Reply LS on Network Sharing (S2-112197) SA2 i/c LS information Yes Yes noted No
    C1-111658 Reply LS on excessive updates of NAS security context (S3-110529) SA3 i/c LS action Yes Yes noted No
    C1-111659 LS on Maximum number of IKEv2 security associations (S3-110531) SA3 i/c LS action Yes Yes replied to No
    C1-111660 LS on Security context mismatch in UMTS and GSM (S3-110544) SA3 i/c LS action Yes Yes replied to No
    C1-111661 Reply LS on MTC USIM requirements for Release 10 (S3-110556) SA3 i/c LS information Yes Yes noted No
    C1-111662 LS reply to CT1 on Support of incremental cost information in AoC-D (S5-111442) SA5 i/c LS information Yes Yes noted No
    C1-111663 Liaison statement from IEEE P802.11 IEEE P802.11 i/c LS information Yes Yes noted No
    C1-111664 LS on the decision of maximum codec mode from b=AS (S4-110534) SA4 i/c LS information Yes Yes noted No
    C1-111665 Reply LS on MTC Planning and Prioritization (SP-110218) SA i/c LS information Yes Yes noted No
    C1-111666 LS on Non-Access Stratum (NAS) configuration parameters for NIMTC (SP-110220) SA i/c LS action Yes Yes noted No
    C1-111667 LS on Network Sharing (SP-110234) SA i/c LS information Yes Yes noted No
    C1-111668 Feedback on IMS workshop 2010 and IV IMS Plugtests in 2011 ETSI TC INT (IMS Network Testing) i/c LS discussion Yes Yes noted No
    C1-111669 Reply LS (IREG LS_065) to 3GPP CT4 on Addressing and Identification on XCAP GSMA IREG PACKET i/c LS information Yes Yes noted No
    C1-111822 LS on UL packet filters (S2-112218) SA2 i/c LS action Yes Yes replied to No
    C1-111823 LS on Clarifications for MM Back-off Timer (S2-112219) SA2 i/c LS information Yes Yes replied to No
    C1-111953 LS on applicability of the extended wait time per CN domain (R2-111717) RAN2 i/c LS action Yes Yes noted No
    C1-111958 attachments of C1-111632 MCC information information Yes Yes noted No
    C1-111968 Reply LS on MTC USIM requirements for Release 10 (C6-110254) CT6 i/c LS information Yes Yes noted No
    C1-111969 Reply LS on eCall testing deliverables (C6-110255) CT6 i/c LS information Yes Yes noted No
    C1-111970 LS on usage of EF_ACL for EPS Network (C6-110285) CT6 i/c LS action Yes Yes replied to No
    C1-112155 Reply LS on Clarifications for MM Back-off Timer (C4-111449) CT4 i/c LS information Yes Yes noted No
    C1-112224 LS on New ATIS ESIF Issue 72, Comparison of SIP Profile for IP Network Interface (INI) for Emergency Services with SIP Profiles in related NNI specifications for CT4 review and input ATIS ESIF i/c LS information Yes Yes noted No
4
Work organization
4.1
Meeting schedule
4.2
Work plan and other administrative issues
C1-111540 work plan MCC workplan agreement Yes Yes noted No
4.3
Election of new CT1-Chairman
C1-111951 Chairmanship candidature - Georg Mayer MCC information information Yes Yes noted No
    C1-111952 Chairmanship candidature - Keith Drage MCC information information Yes Yes noted No
    C1-111954 Chairmanship candidature - Hannu Hietalahti MCC information information Yes Yes noted No
5
Corrections to old releases
5.1
Rel-4 and older
6
Rel-5
6.1
IMS-CCR
6.2
All other Rel-5 WIs
7
Rel-6
7.1
IMS2, PRESNC, SEC1-SC
C1-111594 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes revised No C1-112000
    C1-112000 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes agreed No C1-111594
    C1-111595 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes revised No C1-112001
    C1-112001 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes agreed No C1-111595
    C1-111596 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes revised No C1-112002
    C1-112002 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes agreed No C1-111596
    C1-111597 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes revised No C1-112003
    C1-112003 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes agreed No C1-111597
    C1-111598 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes revised No C1-112004
    C1-112004 P-Access-Network-Info : ABNF correction Ericsson, ST-Ericsson (Christer) CR agreement Yes Yes agreed No C1-111598
    C1-111902 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112005
    C1-112005 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes No [not addressed] No C1-111902
    C1-111903 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112006
    C1-112006 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes No [not addressed] No C1-111903
    C1-111904 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112007
    C1-112007 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes No [not addressed] No C1-111904
    C1-111905 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112008
    C1-112008 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes No [not addressed] No C1-111905
    C1-111906 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112009
    C1-112009 Removal of repetition of IOI header field parameters Alcatel-Lucent / Keith Drage CR agreement Yes No [not addressed] No C1-111906
7.2
All other Rel-6 WIs
8
Rel-7
8.1
VCC, CSICS, CSItermS, SMSIP, EMC1
8.2
SDoUE, NSP-CR, EVGCS, IVGCS, VGCSflex
8.3
PCC, ServID, MTSI, IMSProtoc, GRUU ,FBI, FBI-pcbl
C1-111550 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112010
    C1-112010 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111550
    C1-111551 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR approval Yes Yes revised No C1-112011
    C1-112011 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR approval Yes Yes agreed No C1-111551
    C1-111552 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112012
    C1-112012 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111552
    C1-111553 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112013
    C1-112013 Reference update: RFC 6223 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111553
    C1-111557 Removal of Annex F.3 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112015
    C1-111558 Moving of P-CSCF ICE procedures (Annex K.3.2 and K.5.3)" Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112016
    C1-111559 Removal of Annex G Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112014
    C1-111599 Moving of IBCF ICE procedures (Annex K.5.4) Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112017
    C1-111699 Originating network not aware of the asserted IMS communication service Ericsson, ST-Ericsson, Orange, AT&T, China Mobile Communications Corporation, TeliaSonera, Telecom Italia discussion discussion Yes Yes noted No
    C1-111926 Alignement with RFC3455bis Deutsche Telekom CR agreement Yes Yes revised No C1-112018
    C1-112018 Alignement with RFC3455bis Deutsche Telekom CR agreement No Yes postponed No C1-111926
    C1-111927 Alignement with RFC3455bis Deutsche Telekom CR agreement Yes Yes revised No C1-112019
    C1-112019 Alignement with RFC3455bis Deutsche Telekom CR agreement No Yes postponed No C1-111927
    C1-111928 Alignement with RFC3455bis Deutsche Telekom CR agreement Yes Yes revised No C1-112020
    C1-112020 Alignement with RFC3455bis Deutsche Telekom CR agreement No Yes postponed No C1-111928
    C1-111929 Alignement with RFC3455bis Deutsche Telekom CR agreement Yes Yes revised No C1-112021
    C1-112021 Alignement with RFC3455bis Deutsche Telekom CR agreement No Yes postponed No C1-111929
8.4
All other Rel-7 WIs
8.4.1
All other IMS-related WIs
8.4.2
All other non-IMS-related WIs
C1-111893 Clarification to condition of sending the Network feature durning periodic RAU procedure HTC CR agreement Yes Yes revised No C1-111982
    C1-111982 Clarification to condition of sending the Network feature durning periodic RAU procedure HTC CR agreement No No withdrawn Yes C1-111893
    C1-111894 Clarification to condition of sending the Network feature durning periodic RAU procedure HTC CR agreement Yes Yes revised No C1-111983
    C1-111983 Clarification to condition of sending the Network feature durning periodic RAU procedure HTC CR agreement No No withdrawn Yes C1-111894
    C1-111895 Clarification to condition of sending the Network feature durning periodic RAU procedure HTC CR agreement Yes Yes revised No C1-111984
9
Rel-8
9.1
ETWS, PPACR-CT1, EData, IWLANNSP, EVA, IWLAN_Mob
9.2
SAE issues
9.2.1
SAE for LTE access
C1-111700 Handling of re-attach following TAU reject or Service Request reject NEC, NTT DOCOMO, Panasonic discussion discussion Yes Yes noted No
    C1-111816 Modification of NAS security context storage Ericsson, ST-Ericsson, Verizon Wireless, LG Electronics, Gemalto CR agreement Yes Yes revised No C1-111985
    C1-111985 Modification of NAS security context storage Ericsson, ST-Ericsson, Verizon Wireless, LG Electronics, Gemalto, AT&T CR agreement Yes Yes agreed No C1-111816
    C1-111817 Modification of NAS security context storage Ericsson, ST-Ericsson, Verizon Wireless, LG Electronics, Gemalto CR agreement Yes Yes revised No C1-111986
    C1-111986 Modification of NAS security context storage Ericsson, ST-Ericsson, Verizon Wireless, LG Electronics, Gemalto, AT&T CR agreement Yes Yes agreed No C1-111817
    C1-111818 Modification of NAS security context storage Ericsson, ST-Ericsson, Verizon Wireless, LG Electronics, Gemalto CR agreement Yes Yes revised No C1-111987
    C1-111987 Modification of NAS security context storage Ericsson, ST-Ericsson, Verizon Wireless, LG Electronics, Gemalto, AT&T CR agreement Yes Yes agreed No C1-111818
    C1-111833 Essential correction of the MS Identity IE Qualcomm Incorporated CR agreement Yes Yes rejected No
    C1-111834 Essential correction of the MS Identity IE Qualcomm Incorporated CR agreement Yes Yes rejected No
    C1-111835 Essential correction of the MS Identity IE Qualcomm Incorporated CR agreement Yes Yes rejected No
9.2.2
SAES - 24.302
C1-111760 Reference Update for draft-das-mipshop-andsf-dhcp-options Motorola Mobility CR agreement Yes Yes revised No C1-111988
    C1-111988 Reference Update for draft-das-mipshop-andsf-dhcp-options Motorola Mobility, ZTE CR agreement Yes Yes agreed No C1-111760
    C1-111761 Reference Update for draft-das-mipshop-andsf-dhcp-options Motorola Mobility CR agreement Yes Yes revised No C1-111989
    C1-111989 Reference Update for draft-das-mipshop-andsf-dhcp-options Motorola Mobility, ZTE CR agreement Yes Yes agreed No C1-111761
    C1-111762 Reference Update for draft-das-mipshop-andsf-dhcp-options Motorola Mobility CR agreement Yes Yes revised No C1-111990
    C1-111990 Reference Update for draft-das-mipshop-andsf-dhcp-options Motorola Mobility, ZTE CR agreement Yes Yes agreed No C1-111762
9.2.3
SAES - 24.303
9.2.4
SAES - 24.304
9.2.5
SAES-CSFB
9.2.6
HomeNB-LTE, HomeNB-3G
C1-111725 Aligning NAS and AS on CSG Nokia Siemens Networks CR agreement Yes Yes revised No C1-111994
    C1-111994 Aligning NAS and AS on CSG Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111725
    C1-111726 Aligning NAS and AS on CSG Nokia Siemens Networks CR agreement Yes Yes revised No C1-111995
    C1-111995 Aligning NAS and AS on CSG Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111726
    C1-111727 Aligning NAS and AS on CSG Nokia Siemens Networks CR agreement Yes Yes revised No C1-111996
    C1-111996 Aligning NAS and AS on CSG Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111727
    C1-111734 Manipulation of CSG ID entries (in ACL) and the associated PLMNID - 3G RIM, Chen-Ho CR agreement Yes Yes agreed No
    C1-111735 Manipulation of CSG ID entries (in ACL and OCL) and the associated PLMNID - 3G RIM, Chen-Ho CR agreement Yes Yes agreed No
    C1-111736 Manipulation of CSG ID entries (in ACL and OCL) and the associated PLMNID - 3G RIM, Chen-Ho CR agreement Yes Yes agreed No
    C1-111737 Manipulation of CSG ID entries (in ACL) and the associated PLMNID - LTE RIM, Chen-Ho CR agreement Yes Yes agreed No
    C1-111738 Manipulation of CSG ID entries (in ACL and OCL) and the associated PLMNID - LTE RIM, Chen-Ho CR agreement Yes Yes agreed No
    C1-111739 Manipulation of CSG ID entries (in ACL and OCL) and the associated PLMNID - LTE RIM, Chen-Ho CR agreement Yes Yes agreed No
9.2.7
SAES-SRVCC
9.3
MRFC, MRFC_TS, UUSIW, PktCbl-Intw, PktCbl-Deploy, PktCbl-Sec, NBA, OAM8-Trace, Overlap, PRIOR, IMS_RP, PNM, IMSProtoc2, IMS_Corp
C1-111544 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112022
    C1-112022 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111544
    C1-111545 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112023
    C1-112023 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111545
    C1-111546 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112024
    C1-112024 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111546
    C1-111554 Annex A: RFC 6086 reference corrections Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111555 Annex A: RFC 6086 reference corrections Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111556 Annex A: RFC 6086 reference corrections Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111560 S-CSCF-initiated session release Alcatel-Lucent/ Milo CR agreement Yes No withdrawn Yes
    C1-111561 S-CSCF-initiated session release Alcatel-Lucent/ Milo CR agreement Yes No withdrawn Yes
    C1-111562 S-CSCF-initiated session release Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112025
    C1-112025 S-CSCF-initiated session release Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111562
    C1-111563 Service-Route at the UE Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112038
    C1-112038 Service-Route at the UE Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111563
    C1-111564 Service-Route at the UE Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112039
    C1-112039 Service-Route at the UE Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111564
    C1-111565 Service-Route at the UE Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112040
    C1-112040 Service-Route at the UE Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111565
    C1-111566 Service-Route at the P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112041
    C1-112041 Service-Route at the P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111566
    C1-111567 Service-Route at the P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112042
    C1-112042 Service-Route at the P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111567
    C1-111568 Service-Route at the P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112043
    C1-112043 Service-Route at the P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111568
    C1-111569 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112044
    C1-112044 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112225 C1-111569
    C1-112225 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-112044
    C1-111570 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112045
    C1-112045 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112226 C1-111570
    C1-112226 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-112045
    C1-111571 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112046
    C1-112046 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112227 C1-111571
    C1-112227 Service-Route at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-112046
    C1-111572 Path header field at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112047
    C1-112047 Path header field at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111572
    C1-111573 Path header field at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112048
    C1-112048 Path header field at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111573
    C1-111574 Path header field at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112049
    C1-112049 Path header field at the S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111574
    C1-111575 S-CSCF releasing the dialogs Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112050
    C1-112050 S-CSCF releasing the dialogs Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111575
    C1-111576 S-CSCF releasing the dialogs Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112051
    C1-112051 S-CSCF releasing the dialogs Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111576
    C1-111577 S-CSCF releasing the dialogs Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112052
    C1-112052 S-CSCF releasing the dialogs Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111577
    C1-111578 NOTIFY request Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112026
    C1-112026 NOTIFY request Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111578
    C1-111579 NOTIFY request Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112027
    C1-112027 NOTIFY request Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111579
    C1-111580 NOTIFY request Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112028
    C1-112028 NOTIFY request Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111580
    C1-111581 Network Initiated deregistration at S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112029
    C1-112029 Network Initiated deregistration at S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111581
    C1-111582 Network Initiated deregistration at S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112030
    C1-112030 Network Initiated deregistration at S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111582
    C1-111583 Network Initiated deregistration at S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112031
    C1-112031 Network Initiated deregistration at S-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111583
    C1-111584 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112032
    C1-112032 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112221 C1-111584
    C1-112221 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-112032
    C1-111585 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112033
    C1-112033 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112222 C1-111585
    C1-112222 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-112033
    C1-111586 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112034
    C1-112034 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112223 C1-111586
    C1-112223 Network Initiated deregistration at P-CSCF Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-112034
    C1-111587 Network Initiated deregistration at UE Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112035
    C1-112035 Network Initiated deregistration at UE Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111587
    C1-111588 Network Initiated deregistration at UE Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112036
    C1-112036 Network Initiated deregistration at UE Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111588
    C1-111589 Network Initiated deregistration at UE Alcatel-Lucent/ Milo CR agreement Yes Yes revised No C1-112037
    C1-112037 Network Initiated deregistration at UE Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No C1-111589
    C1-111897 Removal of dial around indicator Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112233
    C1-112233 Removal of dial around indicator Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-111897
    C1-111898 Removal of dial around indicator Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112234
    C1-112234 Removal of dial around indicator Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-111898
    C1-111899 Removal of dial around indicator Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112235
    C1-112235 Removal of dial around indicator Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-111899
    C1-111931 new draft draft-ietf-cuss-sip-uui-00 Deutsche Telekom CR agreement Yes Yes revised No C1-112053
    C1-112053 new draft draft-ietf-cuss-sip-uui-00 Deutsche Telekom CR agreement No Yes postponed No C1-111931
    C1-111932 new draft draft-ietf-cuss-sip-uui-00 Deutsche Telekom CR agreement Yes Yes revised No C1-112054
    C1-112054 new draft draft-ietf-cuss-sip-uui-00 Deutsche Telekom CR agreement No Yes postponed No C1-111932
    C1-111933 new draft draft-ietf-cuss-sip-uui-00 Deutsche Telekom CR agreement Yes Yes revised No C1-112055
    C1-112055 new draft draft-ietf-cuss-sip-uui-00 Deutsche Telekom CR agreement No Yes postponed No C1-111933
9.4
ICSRA, IMS-Cont
C1-111600 Reference removal : draft-ietf-mmusic-sdp-misc-cap Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-111601 Reference removal : draft-ietf-mmusic-sdp-misc-cap Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-111602 Reference removal : draft-ietf-mmusic-sdp-misc-cap Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-111603 Reference removal : draft-ietf-mmusic-sdp-misc-cap Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-111604 Reference removal : draft-ietf-mmusic-sdp-misc-cap Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-111605 Reference removal : draft-ietf-mmusic-sdp-misc-cap Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-111798 Fraud prevention for deregistration for ICS Nokia Siemens Networks CR agreement Yes Yes revised No C1-112059
    C1-112059 Fraud prevention for deregistration for ICS Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111798
    C1-111799 Fraud prevention for deregistration for ICS Nokia Siemens Networks CR agreement Yes Yes revised No C1-112060
    C1-112060 Fraud prevention for deregistration for ICS Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111799
    C1-111800 Fraud prevention for deregistration for ICS Nokia Siemens Networks CR agreement Yes Yes revised No C1-112061
    C1-112061 Fraud prevention for deregistration for ICS Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111800
    C1-111801 MSC sends DeREGISTER Nokia Siemens Networks CR agreement Yes Yes revised No C1-112062
    C1-112062 MSC sends DeREGISTER Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111801
    C1-111802 MSC sends DeREGISTER Nokia Siemens Networks CR agreement Yes Yes revised No C1-112063
    C1-112063 MSC sends DeREGISTER Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111802
    C1-111803 MSC sends DeREGISTER Nokia Siemens Networks CR agreement Yes Yes revised No C1-112064
    C1-112064 MSC sends DeREGISTER Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111803
    C1-111804 Transferable Sessions Nokia Siemens Networks CR agreement Yes Yes revised No C1-112065 C1-110957
    C1-112065 Transferable Sessions Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111804
    C1-111805 Transferable Sessions Nokia Siemens Networks CR agreement Yes Yes revised No C1-112066 C1-110958
    C1-112066 Transferable Sessions Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111805
    C1-111806 Transferable Sessions Nokia Siemens Networks CR agreement Yes Yes revised No C1-112067 C1-110959
    C1-112067 Transferable Sessions Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111806
    C1-111807 Speech component in session Nokia Siemens Networks CR agreement Yes Yes revised No C1-112068
    C1-112068 Speech component in session Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111807
    C1-111808 Speech component in session Nokia Siemens Networks CR agreement Yes Yes revised No C1-112069
    C1-112069 Speech component in session Nokia Siemens Networks CR agreement Yes Yes revised No C1-112250 C1-111808
    C1-112250 Speech component in session Nokia Siemens Networks CR agreement Yes Yes agreed No C1-112069
    C1-111809 Speech component in session Nokia Siemens Networks CR agreement Yes Yes revised No C1-112070
    C1-112070 Speech component in session Nokia Siemens Networks CR agreement Yes Yes revised No C1-112247 C1-111809
    C1-112247 Speech component in session Nokia Siemens Networks CR agreement Yes Yes agreed No C1-112070
    C1-111870 Updating IMEI URN draft reference Research In Motion (Andrew) CR agreement Yes Yes revised No C1-112056
    C1-112056 Updating IMEI URN draft reference Research In Motion (Andrew) CR agreement Yes Yes agreed No C1-111870
    C1-111871 Updating IMEI URN draft reference Research In Motion (Andrew) CR agreement Yes Yes revised No C1-112057
    C1-112057 Updating IMEI URN draft reference Research In Motion (Andrew) CR agreement Yes Yes agreed No C1-111871
    C1-111872 Updating IMEI URN draft reference Research In Motion (Andrew) CR agreement Yes Yes revised No C1-112058
    C1-112058 Updating IMEI URN draft reference Research In Motion (Andrew) CR agreement Yes Yes agreed No C1-111872
9.5
MAINT_R1, MAINT_R2, REDOC_TIS-C1, REDOC_3GPP2
C1-111547 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112071
    C1-112071 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111547
    C1-111548 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112072
    C1-112072 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111548
    C1-111549 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-112073
    C1-112073 Reference update: 199 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111549
    C1-112216 P-Served-User in 3pcc REFER procedure Ericsson,ST-Ericsson/Jan CR agreement Yes No withdrawn Yes C1-111934
    C1-112215 P-Served-User in 3pcc REFER procedure Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-112214 P-Served-User in 3pcc REFER procedure Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-112251 P-Served-User in 3pcc REFER procedure Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
9.6
CCBS-CCNR, CW-IMS, FA, CAT-SS
C1-111720 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes revised No C1-112074
    C1-112074 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes revised No C1-112236 C1-111720
    C1-112236 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes agreed No C1-112074
    C1-111721 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes revised No C1-112075
    C1-112075 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes revised No C1-112237 C1-111721
    C1-112237 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes agreed No C1-112075
    C1-111722 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes revised No C1-112076
    C1-112076 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes revised No C1-112238 C1-111722
    C1-112238 Correction on AS actions for forking model and early session model OKI, NTT CR agreement Yes Yes agreed No C1-112076
    C1-111890 Reference update draft-ietf-bliss-call-completion Deutsche Telekom CR agreement Yes Yes revised No C1-112077
    C1-112077 Reference update draft-ietf-bliss-call-completion Deutsche Telekom CR agreement Yes Yes agreed No C1-111890
    C1-111891 Reference update draft-ietf-bliss-call-completion Deutsche Telekom CR agreement Yes Yes revised No C1-112078
    C1-112078 Reference update draft-ietf-bliss-call-completion Deutsche Telekom CR agreement Yes Yes agreed No C1-111891
    C1-111892 Reference update draft-ietf-bliss-call-completion Deutsche Telekom CR agreement Yes Yes revised No C1-112079
    C1-112079 Reference update draft-ietf-bliss-call-completion Deutsche Telekom CR agreement Yes Yes agreed No C1-111892
9.7
Other Rel-8 work items
9.7.1
All other IMS-related WIs
C1-111541 Reference update: RFC 6135 Ericsson,ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111542 Reference update: RFC 6135 Ericsson,ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111543 Reference update: RFC 6135 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111776 Modifications to Resource Priority Namespaces in Annex A Telcordia Technologies, AT&T, NCS CR agreement Yes Yes agreed No
    C1-111777 Modifications to Resource Priority Namespaces in Annex A Telcordia Technologies, AT&T, NCS CR agreement Yes Yes agreed No
9.7.2
All other non-IMS-related WIs
C1-111532 +CGDATA, correction of syntax ST-Ericsson, Ericsson, Intel / Atle CR agreement Yes Yes agreed No
    C1-111533 +CGDATA, correction of syntax ST-Ericsson, Ericsson, Intel / Atle CR agreement Yes Yes revised No C1-112139
    C1-112139 +CGDATA, correction of syntax ST-Ericsson, Ericsson, Intel / Atle CR agreement Yes Yes agreed No C1-111533
    C1-111534 +CGDATA, correction of syntax ST-Ericsson, Ericsson, Intel / Atle CR agreement Yes Yes agreed No
10
Rel-9
10.1
CRS, eCAT-SS, eMMTel-CC
C1-111723 Correction on General AS action OKI,NTT CR agreement Yes Yes agreed No
    C1-111724 Correction on General AS action OKI,NTT CR agreement Yes Yes agreed No
10.2
IMSProtoc3
10.3
IMS_SCC-SPI, IMS_SCC-ICS, IMS_SCC-ICS_I1
C1-111868 Reference update for IUT Research In Motion (Andrew) CR agreement Yes Yes revised No C1-112080
    C1-112080 Reference update for IUT Research In Motion (Andrew) CR agreement Yes Yes agreed No C1-111868
10.4
EMC2
10.5
MEDIASEC_CORE
10.6
PAN_EPNM
10.7
IMS_EMER_GPRS_EPS
10.7.1
IMS_EMER_GPRS_EPS - stage 3 IMS part
10.7.2
IMS_EMER_GPRS_EPS - stage 2 and 3 access part
C1-111708 Modifications to Emergency Number List IE Samsung CR agreement Yes No withdrawn Yes
    C1-111709 Modifications to Emergency Number List IE Samsung CR agreement Yes Yes revised No C1-112157
10.7.3
IMS_EMER_GPRS_EPS-SRVCC
C1-111784 Disc on how to deliver IMEI of SC UE on 'non-UE detectable EMC' case Huawei/Lili discussion discussion Yes Yes noted No
10.8
SSAC
10.9
VAS4SMS
10.10
PWS-ST3
10.11
eANDSF
10.12
MUPSAP
10.13
LCS_EPS-CPS
C1-111680 Correction on encoding of CS-LCS in EPS network feature support IE NTT DOCOMO, NEC CR agreement Yes Yes agreed No
    C1-111681 Correction on encoding of CS-LCS in EPS network feature support IE NTT DOCOMO, NEC CR agreement Yes Yes agreed No
10.14
EHNB-CT1
10.15
Rel-9 issues for SAES
C1-111728 Removal of CS PLMN reselection requirement for CSFB Nokia Siemens Networks CR agreement Yes Yes revised No C1-111991
    C1-111991 Removal of CS PLMN reselection requirement for CSFB Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111728
    C1-111729 Removal of CS PLMN reselection requirement for CSFB Nokia Siemens Networks CR agreement Yes Yes revised No C1-111992
    C1-111992 Removal of CS PLMN reselection requirement for CSFB Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111729
10.16
Other Rel-9 work items
10.16.1
All other IMS-related WIs
C1-111820 Clarifying reattempt for SUBSCRIBE KDDI, NEC CR agreement Yes Yes postponed No
    C1-111821 Clarifying reattempt for SUBSCRIBE KDDI, NEC CR agreement Yes Yes postponed No
10.16.2
All other non-IMS-related WIs
11
Rel-10
11.1
Release 10 documents for information
C1-111908 Editor's note handling summary for 3GPP TS 24.229 Alcatel-Lucent / Keith Drage discussion discussion No No withdrawn Yes
    C1-111924 New Draft RFC3455bis Deutsche Telekom information information Yes Yes noted No
    C1-111925 Changes for RFC3455bis Deutsche Telekom discussion discussion Yes Yes noted No
    C1-111944 Summary of current IETF documents defining SIP or SIP extensions Alcatel-Lucent / Keith Drage discussion discussion No No withdrawn Yes
    C1-111945 Summary of current IETF documents defining SDP or SDP extensions Alcatel-Lucent / Keith Drage discussion discussion No No withdrawn Yes
    C1-111946 Summary of current IETF documents defining miscellanous IMS impacting extensions Alcatel-Lucent / Keith Drage discussion discussion No No withdrawn Yes
11.2
IMS_SC_eIDT
C1-111593 Reference update: proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-111694 Editorial corrections on controller transfer procedures Intel Corporation (UK) Ltd CR agreement Yes Yes revised No C1-112082
    C1-112082 Editorial corrections on controller transfer procedures Intel Corporation (UK) Ltd CR agreement Yes Yes agreed No C1-111694
    C1-111695 Editorial corrections on controller transfer flow Intel Corporation (UK) Ltd CR agreement Yes Yes agreed No
    C1-111696 Editorial corrections on procedures for media replication by SCC AS Intel Corporation (UK) Ltd CR agreement Yes Yes revised No C1-112083
    C1-112083 Editorial corrections on procedures for media replication by SCC AS Intel Corporation (UK) Ltd CR agreement Yes Yes agreed No C1-111696
    C1-111697 Editorial corrections on flows for media replication by SCC AS Intel Corporation (UK) Ltd CR agreement Yes Yes agreed No
    C1-111698 Editorial corrections on procedures for collaborative sessions with different subscriptions Intel Corporation (UK) Ltd CR agreement Yes Yes agreed No
    C1-111783 Delete unneeded Editor's Notes Huawei/Lili CR agreement Yes Yes revised No C1-112084
    C1-112084 Delete unneeded Editor's Notes Huawei/Lili CR agreement Yes Yes revised No C1-112240 C1-111783
    C1-112240 Delete unneeded Editor's Notes Huawei/Lili CR agreement Yes Yes revised No C1-112252 C1-112084
    C1-112252 Delete unneeded Editor's Notes Huawei/Lili CR agreement Yes Yes agreed No C1-112240
    C1-111869 Reference update and cleanup of IUT Research In Motion (Andrew), CR agreement Yes Yes revised No C1-112081
    C1-112081 Reference update and cleanup of IUT Research In Motion (Andrew), CR agreement Yes Yes revised No C1-112239 C1-111869
    C1-112239 Reference update and cleanup of IUT Research In Motion (Andrew), CR agreement Yes Yes agreed No C1-112081
    C1-111874 Creation of new access leg by the SCC AS Orange/ Youssef discussion discussion Yes Yes noted No
    C1-111875 Creation of new access leg by the SCC AS Orange/ Youssef CR agreement Yes Yes postponed No
    C1-111912 Creation of new access leg by the SCC AS Orange/ Youssef CR agreement Yes Yes postponed No
    C1-111922 Several corrections on media flows transfer procedure initiated by the target UE or by a UE other than the target UE ETRI CR agreement Yes Yes revised No C1-112085
    C1-112085 Several corrections on media flows transfer procedure initiated by the target UE or by a UE other than the target UE ETRI CR agreement Yes Yes revised No C1-112228 C1-111922
    C1-112228 Several corrections on media flows transfer procedure initiated by the target UE or by a UE other than the target UE ETRI CR agreement Yes Yes agreed No C1-112085
    C1-111923 Correction of information call flow about media flow transfer in the Annex A.11 ETRI CR agreement Yes Yes revised No C1-112086
    C1-112086 Correction of information call flow about media flow transfer in the Annex A.11 ETRI CR agreement Yes Yes revised No C1-112229 C1-111923
    C1-112229 Correction of information call flow about media flow transfer in the Annex A.11 ETRI CR agreement Yes Yes agreed No C1-112086
11.3
CCNL
11.4
IMSProtoc4
C1-112016 Moving of P-CSCF ICE procedures (Annex K.3.2 and K.5.3) Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111558
    C1-112014 Removal of Annex G Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111559
    C1-111590 UE initiated deregistration Alcatel-Lucent/ Milo CR agreement Yes Yes agreed No
    C1-112017 Moving of IBCF ICE procedures (Annex K.5.4) Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111599
    C1-111826 IMS handling of media parameters not allowed by the network China Mobile, Huawei, ZTE CR agreement Yes Yes revised No C1-112090
    C1-111827 IMS-ALG functionality in P-CSCF China Mobile, Huawei, ZTE CR agreement Yes Yes revised No C1-112091
    C1-112091 IMS-ALG functionality in P-CSCF China Mobile, Huawei, ZTE CR agreement No Yes postponed No C1-111827
    C1-111877 SIP T1 Timer value for MRFC Orange/ Youssef CR agreement Yes Yes revised No C1-112092
    C1-112092 SIP T1 Timer value for MRFC Orange/ Youssef CR agreement Yes Yes postponed No C1-111877
    C1-111878 Insertion of “gated” parameter by the P-CSCF Orange/ Youssef CR agreement Yes Yes revised No C1-112093
    C1-112093 Insertion of “gated” parameter by the P-CSCF Orange/ Youssef CR agreement Yes Yes revised No C1-112231 C1-111878
    C1-112231 Insertion of "gated" parameter by the P-CSCF Orange/ Youssef CR agreement Yes Yes agreed No C1-112093
    C1-111909 Removal of duplicate material in P-CSCF emergency call handling Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112094
    C1-112094 Removal of duplicate material in P-CSCF emergency call handling Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-111909
    C1-111949 Miscellaneous 24.229 corrections Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
    C1-111950 Handling of content indirection Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112095
    C1-112095 Handling of content indirection Alcatel-Lucent / Keith Drage CR agreement No Yes postponed No C1-111950
11.5
eAOC
C1-111615 Incremental cost information in AOC Ericsson, ST-Ericsson, Deutsche Telekom / Ivo CR agreement Yes Yes revised No C1-112220
    C1-112220 Incremental cost information in AOC Ericsson, ST-Ericsson, Deutsche Telekom / Ivo CR agreement Yes Yes agreed No C1-111615
11.6
OMR
C1-111900 OMR designation as media level attributes in profile Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112096
    C1-112096 OMR designation as media level attributes in profile Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-111900
11.7
IESE
C1-111907 Application server detection and routeing of emergency call Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112097
    C1-112097 Application server detection and routeing of emergency call Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-112232 C1-111907
    C1-112232 Application server detection and routeing of emergency call Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-112097
11.8
eSRVCC
C1-111592 Reference update: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No
    C1-111607 Correcting erroneous references Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-111608 Correcting erroneous subclause references Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-111609 SC UE checking dialog parameters Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-112087
    C1-112087 SC UE checking dialog parameters Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-111609
    C1-111610 Functional entities missing in some introductions Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-111611 Minor error corrections Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-112088
    C1-112088 Minor error corrections Ericsson, ST-Ericsson / Jan CR agreement No Yes postponed No C1-111611
    C1-111613 SRVCC enhancements in Annex A Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-111614 ENs on P-CSCF invoking ATCF Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-111616 ATCF adding Record-Route Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-112203
    C1-112203 ATCF adding Record-Route Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-111616
    C1-111617 EN on ATCF URI assignment Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-112204
    C1-112204 EN on ATCF URI assignment Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-112242 C1-111617
    C1-112242 EN on ATCF URI assignment Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-112204
    C1-111618 SRVCC related information received when session(s) exist Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-111620 SRVCC transferable session Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-112205
    C1-112205 SRVCC transferable session Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-112241 C1-111620
    C1-112241 SRVCC transferable session Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-112205
    C1-111812 Editor’s notes clean up for eSRVCC ZTE CR agreement Yes Yes revised No C1-112206
    C1-112206 Editor's notes clean up for eSRVCC ZTE CR agreement Yes Yes agreed No C1-111812
    C1-111901 Determining eSRVCC transferable session set Alcatel-Lucent / Richard Ejzak CR agreement Yes Yes revised No C1-112207
    C1-112207 Determining eSRVCC transferable session set Alcatel-Lucent / Richard Ejzak CR agreement Yes Yes revised No C1-112243 C1-111901
    C1-112243 Determining eSRVCC transferable session set Alcatel-Lucent / Richard Ejzak CR agreement Yes Yes agreed No C1-112207
11.9
aSRVCC
C1-111612 g.3gpp.mid-call media feature in 2xx response Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-112208
    C1-112208 g.3gpp.mid-call media feature in 2xx response Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-111612
    C1-111621 ENs in alerting SRVCC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-112209
    C1-112209 ENs in alerting SRVCC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-111621
    C1-111717 Add description of SRVCC alerting with forked responses to introduction clause Samsung, ZTE CR agreement Yes Yes agreed No
    C1-111718 Missing aspects for SRVCC due to different permutations of UE and network support Samsung CR agreement Yes Yes revised No C1-112210
    C1-112210 Missing aspects for SRVCC due to different permutations of UE and network support Samsung CR agreement Yes Yes revised No C1-112254 C1-111718
    C1-112254 Missing aspects for SRVCC due to different permutations of UE and network support Samsung CR agreement Yes Yes agreed No C1-112210
    C1-111810 Handling of error in INFO request Nokia Siemens Networks CR agreement Yes Yes revised No C1-112211
    C1-112211 Handling of error in INFO request Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111810
    C1-111811 Feature tag for aSRVCC clean up ZTE CR agreement Yes No withdrawn Yes
11.10
ECSRA_LAA-CN
11.11
eMPS-CN
11.12
NIMTC
C1-111670 exceptions for low priority IE in MM and SM messages Alcatel-Lucent CR agreement Yes Yes revised No C1-112110
    C1-112110 exceptions for low priority IE in MM and SM messages Alcatel-Lucent CR agreement Yes No [not addressed] No C1-111670
    C1-111671 exceptions for low priority IE in MM and SM messages Alcatel-Lucent CR agreement Yes Yes revised No C1-112111
    C1-112111 exceptions for low priority IE in MM and SM messages Alcatel-Lucent CR agreement Yes No [not addressed] No C1-111671
    C1-111672 Corrections for overload behavior Alcatel-Lucent CR agreement Yes Yes revised No C1-111997
    C1-111997 Corrections for overload behavior Alcatel-Lucent CR agreement Yes Yes revised No C1-112188 C1-111672
    C1-112188 Corrections for overload behavior Alcatel-Lucent CR agreement Yes Yes agreed No C1-111997
    C1-111673 Corrections for overload behavior Alcatel-Lucent CR agreement Yes Yes revised No C1-111998
    C1-111998 Corrections for overload behavior Alcatel-Lucent CR agreement Yes Yes agreed No C1-111673
    C1-111682 Backward compatibility issues with MTC NTT DOCOMO discussion discussion Yes Yes noted No
    C1-111701 Clarify switch off condition for ESM backoff timer Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes revised No C1-112101
    C1-112101 Clarify switch off condition for ESM backoff timer Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes revised No C1-112309 C1-111701
    C1-112309 Clarify switch off condition for ESM backoff timer Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement No No [not addressed] No C1-112101
    C1-111702 Clarify switch off condition for SM backoff timer Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes revised No C1-112102
    C1-112102 Clarify switch off condition for SM backoff timer Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes revised No C1-112310 C1-111702
    C1-112310 Clarify switch off condition for SM backoff timer Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement No No [not addressed] No C1-112102
    C1-111703 Clearly specify conditions for UE actions at switch off for T3245, T3446 and T3496 Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes revised No C1-112104
    C1-112104 Clearly specify conditions for UE actions at switch off for T3245, T3446 and T3496. Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes agreed No C1-111703
    C1-111704 Clearly specify conditions for UE actions at switch off for T3245, T3346 and T3396 Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes revised No C1-112105
    C1-112105 Clearly specify conditions for UE actions at switch off for T3245, T3346 and T3396. Samsung, HTC, InterDigital Communications, Alcatel-Lucent CR agreement Yes Yes agreed No C1-111704
    C1-111705 Further clarification of PLMN reselection and handling of EMM back-off timer Samsung CR agreement Yes Yes revised No C1-112106
    C1-112106 Further clarification of PLMN reselection and handling of EMM back-off timer Samsung CR agreement Yes Yes agreed No C1-111705
    C1-111706 Further clarification of PLMN reselection and handling of MM back-off timer Samsung CR agreement Yes Yes revised No C1-112107
    C1-112107 Further clarification of PLMN reselection and handling of MM back-off timer Samsung CR agreement Yes Yes agreed No C1-111706
    C1-111740 Missing abnormal handling of EXTENDED SERVICE REQUEST RIM, Chen-Ho CR agreement Yes Yes revised No C1-112108
    C1-112108 Missing abnormal handling of EXTENDED SERVICE REQUEST Research In Motion CR agreement Yes Yes agreed No C1-111740
    C1-111741 NIMTC and MultiMedia Priority Services and RRC establishment cause RIM, Chen-Ho discussion discussion Yes Yes noted No
    C1-111742 Setting of RRC establishment cause for Multimedia Priority Services – 24.301 RIM, Chen-Ho CR agreement Yes No withdrawn Yes
    C1-111743 Setting of RRC establishment cause for Multimedia Priority Services – 24.008 RIM, Chen-Ho CR agreement Yes No withdrawn Yes
    C1-111747 Addition of MM backoff timer for CS Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-112109
    C1-112109 Addition of MM backoff timer for CS Ericsson, ST-Ericsson, Vodafone, HTC, ZTE CR agreement Yes Yes revised No C1-112330 C1-111747
    C1-112330 Addition of MM backoff timer for CS Ericsson, ST-Ericsson, Vodafone, HTC, ZTE CR agreement Yes Yes agreed No C1-112109
    C1-111748 Specification of missing timer identities Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-111749 Replace T3446 with T3346 Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-112116
    C1-112116 Replace T3446 with T3346 Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-111749
    C1-111755 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes revised No C1-112118
    C1-112118 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes agreed No C1-111755
    C1-111756 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes revised No C1-112119
    C1-112119 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes agreed No C1-111756
    C1-111757 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes revised No C1-112120
    C1-112120 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes agreed No C1-111757
    C1-111758 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes revised No C1-112117
    C1-112117 Reference to NAS configuration in USIM Vodafone CR agreement Yes Yes agreed No C1-111758
    C1-111768 Inter RAT Change Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-112121
    C1-112121 Inter RAT Change Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-112318 C1-111768
    C1-112318 Inter RAT Change Nokia Siemens Networks, Nokia CR agreement Yes Yes agreed No C1-112121
    C1-111769 Inter RAT Change Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-112122
    C1-112122 Inter RAT Change Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-112320 C1-111769
    C1-112320 Inter RAT Change Nokia Siemens Networks, Nokia CR agreement Yes Yes agreed No C1-112122
    C1-111770 Extended Service Request Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-112123
    C1-112123 Extended Service Request Nokia Siemens Networks, Nokia CR agreement Yes No withdrawn Yes C1-111770
    C1-111771 Service Request Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-112124
    C1-112124 Service Request Nokia Siemens Networks, Nokia CR agreement No No withdrawn Yes C1-111771
    C1-111772 Handling Network initiated procedure when backoff timer is running Nokia Siemens Networks, Nokia, HTC CR agreement Yes Yes revised No C1-112125
    C1-112125 Handling Network initiated procedure when backoff timer is running Nokia Siemens Networks, Nokia, HTC CR agreement Yes Yes revised No C1-112331 C1-111772
    C1-112331 Handling Network initiated procedure when backoff timer is running Nokia Siemens Networks, Nokia, HTC CR agreement Yes Yes agreed No C1-112125
    C1-111773 Handling Network initiated procedure when backoff timer is running Nokia Siemens Networks, Nokia, HTC CR agreement Yes Yes revised No C1-112126
    C1-112126 Handling Network initiated procedure when backoff timer is running Nokia Siemens Networks, Nokia, HTC CR agreement Yes Yes revised No C1-112319 C1-111773
    C1-112319 Handling Network initiated procedure when backoff timer is running Nokia Siemens Networks, Nokia, HTC CR agreement Yes Yes agreed No C1-112126
    C1-111774 Emergency attach during backoff Nokia Siemens Networks, Nokia, Alcatel-Lucent, ZTE, LG Electronics CR agreement Yes Yes revised No C1-112127
    C1-112127 Emergency attach during backoff Nokia Siemens Networks, Nokia, Alcatel-Lucent, ZTE, LG Electronics CR agreement Yes Yes revised No C1-112322 C1-111774
    C1-112322 Emergency attach during backoff Nokia Siemens Networks, Nokia, Alcatel-Lucent, ZTE, LG Electronics CR agreement Yes Yes agreed No C1-112127
    C1-111775 Emergency attach during backoff Nokia Siemens Networks, Nokia, Alcatel-Lucent, ZTE CR agreement Yes Yes revised No C1-112128
    C1-112128 Emergency attach during backoff Nokia Siemens Networks, Nokia, Alcatel-Lucent, ZTE CR agreement Yes Yes revised No C1-112323 C1-111775
    C1-112323 Emergency attach during backoff Nokia Siemens Networks, Nokia, Alcatel-Lucent, ZTE CR agreement Yes Yes agreed No C1-112128
    C1-111778 Correction to Service Request procedure InterDigital CR agreement Yes Yes revised No C1-112132
    C1-112132 Correction to the service request procedure InterDigital CR agreement Yes Yes agreed No C1-111778
    C1-111785 Session Management congestion control under general overload conditions CATT discussion discussion Yes Yes noted No
    C1-111786 Session Management congestion control under general overload conditions CATT CR agreement Yes No withdrawn Yes
    C1-111787 Session Management congestion control under general overload conditions CATT CR agreement Yes No withdrawn Yes
    C1-111788 alignment about MM congestion control CATT CR agreement Yes Yes revised No C1-112129
    C1-112129 alignment about MM congestion control CATT, LG Electronics CR agreement Yes Yes agreed No C1-111788
    C1-111789 alignment about MM congestion control CATT CR agreement Yes Yes revised No C1-112130
    C1-112130 alignment about MM congestion control CATT CR agreement Yes Yes agreed No C1-111789
    C1-111790 re-attach for emergency bearer service CATT CR agreement Yes Yes revised No C1-112133
    C1-112133 re-attach for emergency bearer service CATT, Renesas Mobile Europe CR agreement Yes Yes revised No C1-112324 C1-111790
    C1-112324 re-attach for emergency bearer service CATT, Renesas Mobile Europe CR agreement No No [not addressed] No C1-112133
    C1-111791 storing APN congestion back-off time per MS per APN CATT CR agreement Yes No withdrawn Yes
    C1-111792 storing APN congestion back-off time per UE per APN CATT CR agreement Yes No withdrawn Yes
    C1-111793 Discussion on «Backoff timer behaviour with non-3GPP access» NEC / Gottfried discussion discussion Yes Yes noted No
    C1-111794 T3446 behaviour with mobility with non-3GPP access NEC / Gottfried CR agreement Yes No withdrawn Yes
    C1-111795 T3346 behaviour with mobility with non-3GPP access NEC / Gottfried CR agreement Yes No withdrawn Yes
    C1-111813 Clarification of reachability management for a back-off UE HTC CR agreement Yes No withdrawn Yes
    C1-111814 Clarification of reachability management for a back-off UE HTC CR agreement Yes No withdrawn Yes
    C1-111845 RRC establishment cause for MT services Huawei, Hisilicon CR agreement Yes Yes agreed No
    C1-111846 NAS signalling low priority indication for exception cases Huawei, Hisilicon CR agreement Yes Yes revised No C1-112112
    C1-112112 NAS signalling low priority indication for exception cases Huawei, Hisilicon CR agreement Yes Yes agreed No C1-111846
    C1-111847 NAS signalling low priority indication for exception cases Huawei, Hisilicon CR agreement Yes Yes revised No C1-112113
    C1-112113 NAS signalling low priority indication for exception cases Huawei, Hisilicon CR agreement Yes Yes agreed No C1-111847
    C1-111848 Correction on UE behavior for ESM cause #26 and #27 Huawei, Hisilicon CR agreement Yes Yes revised No C1-112134
    C1-112134 Correction on UE behavior for ESM cause #26 and #27 Huawei, Hisilicon CR agreement Yes Yes revised No C1-112311 C1-111848
    C1-112311 Correction on UE behavior for ESM cause #26 and #27 Huawei, Hisilicon CR agreement Yes Yes agreed No C1-112134
    C1-111849 Correction on MS behavior for SM cause #26 and #27 Huawei, Hisilicon CR agreement Yes Yes revised No C1-112135
    C1-112135 Correction on MS behavior for SM cause #26 and #27 Huawei, Hisilicon CR agreement Yes Yes revised No C1-112312 C1-111849
    C1-112312 Correction on MS behavior for SM cause #26 and #27 Huawei, Hisilicon CR agreement Yes Yes agreed No C1-112135
    C1-111850 TAU attempt counter reset under T3446 running Huawei, Hisilicon CR agreement Yes Yes revised No C1-112131
    C1-112131 TAU attempt counter reset under T3446 running Huawei, Hisilicon CR agreement Yes Yes agreed No C1-111850
    C1-111856 Correction to sub-clause reference Huawei, Hisilicon CR agreement Yes Yes agreed No
    C1-111861 Adding applicability of MM back off timer to CS domain procedure. HTC, ZTE CR agreement Yes Yes postponed No
    C1-111862 Adding applicability of MM back off timer to CS domain procedure. HTC, ZTE CR agreement Yes Yes postponed No
    C1-111863 Adding applicability of MM back off timer in location update procedure HTC, ZTE CR agreement Yes Yes postponed No
    C1-111864 Adding applicability of MM back off timer in location update procedure HTC, ZTE CR agreement Yes Yes postponed No
    C1-111865 Clarification to SM back off timer HTC, ZTE CR agreement Yes No withdrawn Yes
    C1-111866 Clarification to ESM back off timer HTC, ZTE CR agreement Yes No withdrawn Yes
    C1-111880 Clarification about APN based congestion control procedure LG CR agreement Yes Yes revised No C1-112158
    C1-112158 Clarification about APN based congestion control procedure LG CR agreement Yes Yes agreed No C1-111880
    C1-111881 Clarification about APN based congestion control LG CR agreement Yes Yes revised No C1-112159
    C1-112159 Clarification about APN based congeston control procedure LG CR agreement Yes Yes agreed No C1-111881
    C1-111882 Clarification of subscribed APN based congestion control LG CR agreement Yes No withdrawn Yes
    C1-111883 Clarification of subscribed APN based congestion control LG CR agreement Yes No withdrawn Yes
    C1-111884 Clarification of TAU triggered after paging LG CR agreement Yes Yes revised No C1-112160
    C1-112160 Clarification of TAU triggered after paging LG CR agreement No No [not addressed] No C1-111884
    C1-111885 Clarification of RAU triggered after paging LG CR agreement Yes Yes revised No C1-112161
    C1-112161 Clarification of RAU triggered after paging LG CR agreement No No [not addressed] No C1-111885
    C1-111886 Correction of T3496 handling for PDN connection reactivation LG CR agreement Yes Yes revised No C1-112176
    C1-112176 Correction of T3496 handling for PDN connection reactivation LG CR agreement Yes Yes revised No C1-112316 C1-111886
    C1-112316 Correction of T3396 handling for PDN connection reactivation LG CR agreement Yes Yes agreed No C1-112176
    C1-111887 Correction of T3396 handling for PDN connection reactivation LG CR agreement Yes Yes revised No C1-112177
    C1-112177 Correction of T3396 handling for PDN connection reactivation LG CR agreement Yes Yes revised No C1-112317 C1-111887
    C1-112317 Correction of T3396 handling for PDN connection reactivation LG CR agreement Yes Yes agreed No C1-112177
    C1-111896 WID on "Stage 3 for NIMTC" Ericsson, ST-Ericsson revised WID agreement Yes Yes revised No C1-112162
    C1-112162 WID on "Stage 3 for NIMTC" Ericsson, ST-Ericsson revised WID agreement Yes Yes revised No C1-112308 C1-111896
    C1-112308 WID on "Stage 3 for NIMTC" Ericsson, ST-Ericsson revised WID agreement Yes Yes agreed No C1-112162
    C1-111913 Avoiding MTC related overload to CS domain of local networks Vodafone CR agreement Yes No withdrawn Yes
    C1-111914 Per MS T3212 rather than T3212 multiplier Vodafone CR agreement Yes Yes revised No C1-112163
    C1-112163 Per MS T3212 rather than T3212 multiplier Vodafone CR agreement Yes Yes agreed No C1-111914
    C1-111915 Call forwarding, paging and long periodic timers Vodafone CR agreement Yes Yes revised No C1-112164
    C1-112164 Call forwarding, paging and long periodic timers Vodafone CR agreement Yes Yes postponed No C1-111915
    C1-111916 Call forwarding, paging and long periodic timers Vodafone CR agreement Yes Yes revised No C1-112165
    C1-112165 Call forwarding, paging and long periodic timers Vodafone CR agreement Yes Yes postponed No C1-111916
    C1-111917 Attach with IMSI in CS domain at PLMN change for MTC devices Vodafone CR agreement Yes Yes revised No C1-112178
    C1-112178 Attach with IMSI in CS domain at PLMN change for MTC devices Vodafone CR agreement Yes Yes revised No C1-112325 C1-111917
    C1-112325 Attach with IMSI in CS domain at PLMN change for MTC devices Vodafone CR agreement Yes Yes agreed No C1-112178
    C1-111940 Emergency bearer services for low priority UE ZTE, Research In Motion CR agreement Yes Yes revised No C1-112114
    C1-112114 Emergency bearer services for low priority UE ZTE, Research In Motion CR agreement Yes Yes revised No C1-112300 C1-111940
    C1-112300 Emergency bearer services for low priority UE ZTE, Research In Motion CR agreement Yes Yes postponed No C1-112114
    C1-111941 Emergency bearer services for low priority MS ZTE, Research In Motion CR agreement Yes Yes revised No C1-112115
    C1-112115 Emergency bearer services for low priority MS ZTE, Research In Motion CR agreement Yes Yes revised No C1-112301 C1-111941
    C1-112301 Emergency bearer services for low priority MS ZTE, Research In Motion CR agreement Yes Yes postponed No C1-112115
11.13
AT_IMS
C1-111707 +CSVIMS, status of voice calls within the IMS Samsung CR agreement Yes Yes postponed No
    C1-111844 Correcting missing indication of availability for voice calls in the IMS RIM CR agreement Yes No withdrawn Yes
11.14
AT_UICC
C1-111535 Cleanups for WI AT_UICC ST-Ericsson, Ericsson / Atle CR agreement Yes Yes revised No C1-111960
    C1-111960 Cleanups for WI AT_UICC Giesecke & Devrient CR agreement Yes Yes agreed No C1-111535
    C1-112015 Removal of Annex F.3 Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-111557
11.15
SMOG-ST3
C1-111674 IP address allocation when using GTP on S2b ZTE CR agreement Yes Yes revised No C1-112138
    C1-112138 IP address allocation when using GTP on S2b ZTE CR agreement Yes Yes agreed No C1-111674
11.16
IFOM-CT
C1-111759 Applicability of ISRP to ANDSF MO Motorola Mobility CR agreement Yes No withdrawn Yes
    C1-111815 New subclause structure and cleanups Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-112140
    C1-112140 New subclause structure and cleanups Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-111815
    C1-111825 IP address representation clarification for IP address nodes Nokia Siemens Networks CR agreement Yes Yes revised No C1-112141
    C1-112141 IP address representation clarification for IP address nodes Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111825
    C1-111839 Correction on IFOM and MAPCON UE capability Qualcomm Incorporated CR agreement Yes Yes revised No C1-112142
    C1-112142 Correction on IFOM and MAPCON UE capability Qualcomm Incorporated CR agreement Yes Yes agreed No C1-111839
    C1-111841 References to RFC Qualcomm Incorporated CR agreement Yes Yes revised No C1-112143
    C1-112143 References to RFC Qualcomm Incorporated CR agreement Yes Yes agreed No C1-111841
    C1-111842 References to RFC Qualcomm Incorporated CR agreement Yes Yes agreed No
11.17
LIPA
C1-111686 Corrections to LIPA PDN Connection Deactivation Alcatel-Lucent/ Jennifer CR agreement Yes No withdrawn Yes
    C1-111687 Corrections to LIPA PDN Connection Deactivation Alcatel-Lucent/ Jennifer CR agreement Yes No withdrawn Yes
    C1-111751 Correct conditions for including the connectivity type IE RIM, HTC CR agreement Yes Yes agreed No
    C1-111752 Correct conditions for including the connectivity type IE RIM, HTC CR agreement Yes Yes agreed No
    C1-111753 Correct the trigger of the LIPA PDN disconnection RIM, ZTE CR agreement Yes Yes revised No C1-112144
    C1-112144 Correct the trigger of the LIPA PDN disconnection RIM, ZTE CR agreement Yes Yes revised No C1-112189 C1-111753
    C1-112189 Correct the trigger of the LIPA PDN disconnection Research In Motion UK Ltd., ZTE, Alcatel-Lucent CR agreement Yes Yes agreed No C1-112144
    C1-111754 Correct the trigger of the LIPA PDN disconnection RIM, ZTE CR agreement Yes Yes revised No C1-112145
    C1-112145 Correct the trigger of the LIPA PDN disconnection RIM, ZTE CR agreement Yes Yes agreed No C1-111754
    C1-111843 Correcting handling of CSFB ESR for UE with only LIPA PDN Connections RIM CR agreement Yes No withdrawn Yes
    C1-111851 LIPA PDN connection rejection due to lacking of L-GW address Huawei, Hisilicon CR agreement Yes Yes postponed No
    C1-111852 LIPA PDN connection rejection due to lacking of L-GW address Huawei, Hisilicon CR agreement Yes Yes postponed No
    C1-111888 LIPA PDN connectivity request during handover preparation LG CR agreement Yes Yes revised No C1-112149
    C1-112149 LIPA PDN connectivity request during handover preparation LG CR agreement Yes Yes revised No C1-112315 C1-111888
    C1-112315 LIPA PDN connectivity request during handover preparation LG CR agreement Yes Yes agreed No C1-112149
    C1-111920 Service reject for LIPA only Huawei, Hisilicon CR agreement Yes Yes revised No C1-112146
    C1-112146 Service reject for LIPA only Huawei, Hisilicon, Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-112326 C1-111920
    C1-112326 Service reject for LIPA only Huawei, Hisilicon, Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-112146
    C1-111938 Add a new ESM cause for LIPA ZTE CR agreement Yes Yes postponed No
    C1-111939 Add a new SM cause for LIPA ZTE CR agreement Yes Yes postponed No
11.18
SIPTO
11.19
MAPCON-St3
C1-111675 Clarification on the relation of the user preferences with ISRP in a MAPCON UE ZTE CR agreement Yes Yes revised No C1-112150
    C1-112150 Clarification on the relation of the user preferences with ISRP in a MAPCON UE ZTE CR agreement Yes Yes agreed No C1-111675
11.20
TIGHTER
11.21
MOCN–GERAN
11.22
FS_UE-CN_ES
C1-111796 Input reference version of TR 24.826 NEC (rapporteur) draft TS/TR information Yes Yes noted No
    C1-111797 Conclusions / Part 2 NEC / Gottfried pseudo CR agreement Yes Yes revised No C1-112175
    C1-112175 Conclusions / Part 2 NEC / Gottfried pseudo CR agreement Yes Yes agreed No C1-111797
    C1-111921 Elimination of editor’s notes NEC / Gottfried pseudo CR agreement Yes Yes agreed No
11.23
Rel-10 issues for SAES
C1-111676 ANDSF discovery by DHCP ZTE CR agreement Yes No withdrawn Yes
    C1-111677 Support for access to external private networks via S2b ZTE CR agreement Yes Yes revised No C1-112174
    C1-112174 Support for access to external private networks via S2b ZTE CR agreement No Yes postponed No C1-111677
    C1-111678 Avoiding MO CSFB double gating problem NTT DOCOMO discussion discussion Yes Yes noted No
    C1-111679 Avoiding the problem of barring duplication for CSFB NTT DOCOMO CR agreement Yes Yes revised No C1-112166
    C1-112166 Avoiding the problem of barring duplication for CSFB NTT DOCOMO CR agreement Yes Yes agreed No C1-111679
    C1-111688 Discussion on SGs/Gs UE unreachable handling Alcatel-Lucent/ Jennifer discussion discussion Yes Yes noted No
    C1-111689 Correction on SGs UE unreachable handling Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112167
    C1-112167 Correction on SGs UE unreachable handling Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112313 C1-111689
    C1-112313 Correction on SGs UE unreachable handling Alcatel-Lucent/ Jennifer CR agreement Yes Yes agreed No C1-112167
    C1-111690 Correction on Gs UE unreachable handling Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112168
    C1-112168 Correction on Gs UE unreachable handling Alcatel-Lucent/ Jennifer CR agreement No No [not addressed] No C1-111690
    C1-111691 UE Paging Initiation after SGs association has been established Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112184
    C1-112184 UE Paging Initiation after SGs association has been established Alcatel-Lucent/ Jennifer CR agreement Yes Yes agreed No C1-111691
    C1-111692 Detach handling for Implicit IMSI detach from non-EPS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112185
    C1-112185 Detach handling for Implicit IMSI detach from non-EPS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes agreed No C1-111692
    C1-111693 Detach handling for Implicit IMSI detach from non-GPRS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112186
    C1-112186 Detach handling for Implicit IMSI detach from non-GPRS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes agreed No C1-111693
    C1-111710 Clarifications for removal of numbers from the Local Emergency Numbers List Samsung CR agreement Yes Yes postponed No
    C1-111711 Clarifications for removal of numbers from the Local Emergency Numbers List Samsung CR agreement Yes Yes postponed No
    C1-111712 DISCUSSION: Regarding C1-104520 and C1-111483 on IMS VoIP handover Samsung, HTC discussion discussion Yes No withdrawn Yes
    C1-111713 Release of established NAS signalling connection Samsung, HTC CR agreement Yes No withdrawn Yes
    C1-111714 Decouple UE's emergency BS capability from UE's IMS voice capability Samsung CR agreement Yes Yes postponed No
    C1-111715 Decouple UE's emergency BS capability from UE's IMS voice capability Samsung CR agreement Yes Yes postponed No
    C1-111730 New Location Update Request during TMSI reallocation procedure Nokia Siemens Networks CR agreement Yes Yes revised No C1-112169
    C1-112169 New Location Update Request during TMSI reallocation procedure Nokia Siemens Networks CR agreement Yes Yes postponed No C1-111730
    C1-111731 New Location Update Request during TMSI reallocation procedure Nokia Siemens Networks CR agreement Yes Yes revised No C1-112170
    C1-112170 New Location Update Request during TMSI reallocation procedure Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111731
    C1-111744 IMSVoPS and SRVCC RIM, Chen-Ho discussion discussion Yes Yes noted No
    C1-111745 Keeping PS session in successful Intra-LTE Handover RIM, Chen-Ho CR agreement Yes No withdrawn Yes C1-111483
    C1-111750 Correction of the paging procedure via the SGs interface Ericsson, ST-Ericsson CR agreement Yes Yes postponed No
    C1-111763 Updating IMSI detach flag during explicit IMSI detach for non-EPS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112179
    C1-112179 Updating IMSI detach flag during explicit IMSI detach for non-EPS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes agreed No C1-111763
    C1-111764 Updating IMSI detach flag during explicit IMSI detach for non-GPRS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes revised No C1-112180
    C1-112180 Updating IMSI detach flag during explicit IMSI detach for non-GPRS services Alcatel-Lucent/ Jennifer CR agreement Yes Yes agreed No C1-111764
    C1-111765 Discussion on the trigger of EPS detach indication during UE detach Alcatel-Lucent/ Jennifer discussion discussion Yes Yes noted No
    C1-111766 Correction on the trigger of EPS detach indication during UE detach Alcatel-Lucent/ Jennifer CR agreement Yes No [not addressed] No
    C1-111767 Discussion on support of CSFB and SMS MT services after long MME failure Alcatel-Lucent, AT&T discussion discussion Yes Yes noted No
    C1-111779 Stopping Timer T3417ext upon reception of SERVICE REJECT InterDigital CR agreement Yes Yes revised No C1-112171
    C1-112171 Stopping Timer T3417ext upon reception of SERVICE REJECT InterDigital CR agreement Yes Yes agreed No C1-111779
    C1-111824 Authentication with external data networks over S2b Nokia Siemens Networks CR agreement Yes No withdrawn Yes
    C1-111838 Discussion paper, Unidirectional bearer / PDP context issue Qualcomm Incorporated discussion discussion Yes Yes noted No
    C1-111840 Clarification on ANDSF usage for I-WLAN mobility Qualcomm Incorporated CR agreement Yes Yes revised No C1-112172
    C1-112172 Clarification on ANDSF usage for I-WLAN mobility Qualcomm Incorporated CR agreement Yes Yes agreed No C1-111840
    C1-111853 Disable and re-enable of EMM combined procedures capability Huawei, Hisilicon CR agreement Yes Yes postponed No
    C1-111854 SMS paging at MME failure Huawei, Hisilicon CR agreement Yes Yes agreed No
    C1-111855 Correction to handling of reject cause #14 Huawei, Hisilicon CR agreement Yes Yes revised No C1-112182
    C1-112182 Correction to handling of reject cause #14 Huawei, Hisilicon CR agreement Yes Yes agreed No C1-111855
    C1-111857 SMS paging at MME failure Huawei, Hisilicon CR agreement Yes Yes revised No C1-112187
    C1-112187 SMS paging at MME failure Huawei, Hisilicon CR agreement Yes Yes agreed No C1-111857
    C1-111858 Paging response when LA was changed Huawei, Hisilicon CR agreement Yes No [not addressed] No
    C1-111859 Abnormal case for SGs location update procedure Huawei, Hisilicon CR agreement Yes No [not addressed] No
    C1-111860 Abnormal case for Gs location update procedure Huawei, Hisilicon CR agreement Yes No [not addressed] No
    C1-111873 Initiating Service request peocedure for HRPD during intersystem change Nokia Siemens Networks CR agreement Yes Yes revised No C1-112183
    C1-112183 Initiating Service request peocedure for HRPD during intersystem change Nokia Siemens Networks CR agreement Yes Yes agreed No C1-111873
    C1-111879 ANDSF applicability to I-WLAN Mobility Research In Motion UK Ltd (Adrian), CR agreement Yes Yes postponed No
    C1-111984 Clarification to condition of sending the Network feature durning periodic RAU procedure HTC CR agreement Yes Yes revised No C1-112190 C1-111895
    C1-112190 Clarification to condition of sending the Network feature durning periodic RAU procedure. HTC CR