3GPP TDocs (written contributions) at meeting
Meeting: R1-65 - 2011-05-09 to 2011-05-13, Barcelona
meeting id: R1-65 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑111225 | Draft Agenda for RAN1#65 meeting | RAN1 Chairman | Approved |
R1‑111226 | Final report of RAN1#64 meeting | MCC Support | Noted - Revised |
R1‑111227 | Selected highlights from RAN#51 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑111228 | Reply LS on the tail issues for TDD mode with configuration 0/6 in eICIC | RAN2, Samsung | Noted |
R1‑111229 | LS on Timing Requirements for SCell Activation and Deactivation | RAN2, InterDigital | Noted |
R1‑111230 | LS on Rel-10 LTE UE capabilities | RAN2, NTT DoCoMo | Noted |
R1‑111231 | Reply LS on definition of ABS | RAN2, Qualcomm | Noted |
R1‑111232 | Reply LS on Security for LTE relay nodes | RAN3, NTT DoCoMo | Noted |
R1‑111233 | Reply LS on Simultaneous SRS on more than one carrier | RAN4, CATT, Ericsson | Noted |
R1‑111234 | Reply LS on Power Headroom Reporting | RAN4, CATT | Noted |
R1‑111235 | LS on Rel-10 UE capabilities | RAN, NTT DoCoMo, Qualcomm | Noted |
R1‑111236 | LS on additional considerations of Relay Nodes in the LTE-Advanced material for Rec. ITU-R M.[IMT.RSPEC] to be submitted to ITU-R WP5D#10 (6-13 April, 2011) | RAN ITU-R Adhoc, TelecomItalia | Not treated |
R1‑111237 | LS on Network Sharing | SA, Teliasonera | Noted |
R1‑111238 | Analysis of MLB utilizing UL PC parameters | Huawei | Noted |
R1‑111239 | Draft CR 36.213 on HARQ-ACK resource allocation for TDD mode a | Huawei, HiSilicon, ZTE | Revised |
R1‑111240 | 36.213 CR0274 (Rel-10, F) Correction to HARQ-ACK procedure for TDD mode b with M=2 | Huawei, HiSilicon | Revised |
R1‑111241 | Remaining details on HARQ-ACK procedure with PUCCH format 3 for TDD | Huawei, HiSilicon | Revised |
R1‑111242 | Draft CR 36.213 on HARQ-ACK procedure with PUCCH format 3 for TDD | Huawei, HiSilicon | Not treated |
R1‑111243 | PUSCH A/N codebook size and RE determination for TDD | Huawei, HiSilicon | Noted |
R1‑111244 | 36.213 CR0275 (Rel-10, B) Determination of PUSCH A/N codebook size for TDD | Huawei, HiSilicon | Noted - Revised |
R1‑111245 | 36.213 CR0276 (Rel-10, B) The triggering of aperiodic SRS in DCI formats 2B and 2C | Huawei, HiSilicon, CMCC, Texas Instruments, Sharp, Nokia Siemens Networks, Nokia, Potevio, Ericsson, ST-Ericsson, Research In Motion, New Postcom | Agreed |
R1‑111246 | Updated DL CoMP JP performance evaluation of phase 1 based on agreed simulations assumptions | Huawei, HiSilicon | Noted |
R1‑111247 | DL CoMP CB performance evaluation of phase 1 based on agreed simulations assumptions | Huawei, HiSilicon | Noted |
R1‑111248 | Performance evaluation of DL CoMP in scenario 3 | Huawei, HiSilicon | Noted |
R1‑111249 | Performance evaluation of DL CoMP in scenario 4 | Huawei, HiSilicon | Noted |
R1‑111250 | Discussion on the operation and performance of CoMP in scenarios 3 and 4 | Huawei, HiSilicon | Noted |
R1‑111251 | Cooperation set management procedure | Huawei, HiSilicon | Withdrawn |
R1‑111252 | Performance evaluation of uplink CoMP | Huawei, HiSilicon | Not treated |
R1‑111253 | Investigation on downlink control channel and signaling enhancements | Huawei, HiSilicon | Noted |
R1‑111254 | Investigation on CSI feedback enhancements for closed-loop MIMO | Huawei, HiSilicon | Noted |
R1‑111255 | Investigation on downlink DMRS enhancements | Huawei, HiSilicon | Not treated |
R1‑111256 | PCI Feedback Link Analysis due to Antenna Imbalance | Qualcomm Incorporated | Noted |
R1‑111257 | Determination of PCI feedback when UE is in SHO | Qualcomm Incorporated | Noted |
R1‑111258 | Explaining scheduler operation for UL-MIMO with an example | Qualcomm Incorporated | Noted |
R1‑111259 | Closed Loop UL TxDiv feedback generation in Soft Handover | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111260 | UL TxD codebook and DL feedback requirements | Nokia Siemens Networks, Nokia | Noted |
R1‑111261 | On the UL TxD feedback loop timing | Nokia Siemens Networks, Nokia | Not treated |
R1‑111262 | Evaluation on antenna imbalance effect | Huawei, HiSilicon | Revised |
R1‑111263 | Further codebook analysis and evaluation | Huawei, HiSilicon | Revised |
R1‑111264 | Performance of absolute and recursive feedback methods | Huawei, HiSilicon | Revised |
R1‑111265 | HS-DPCCH performance in soft-handover scenario | Huawei, HiSilicon | Revised |
R1‑111266 | On the choice of PCI feedback determination | Huawei, HiSilicon | Revised |
R1‑111267 | Codebook design for CLTD with balanced transmit antennas | Ericsson, ST-Ericsson | Noted |
R1‑111268 | Codebook design for CLTD with unbalanced transmit antennas | Ericsson, ST-Ericsson | Noted |
R1‑111269 | On the need for dynamic activation and deactivation of CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111270 | Pre-coding weight generation in CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111271 | Simulation results and evaluation of feedback channel requirements | InterDigital Communications, LLC | Noted |
R1‑111272 | Impact of Amplitude Component on System Level CL Tx Diversity Performance with RAKE receiver, ISD of 1000 m and 0 dB long term imbalance | Renesas Electronics Europe | Withdrawn |
R1‑111273 | Impact of Amplitude Component on System Level CL Tx Diversity Performance with RAKE receiver, ISD of 2800 m and 0 dB long term imbalance | Renesas Electronics Europe | Revised |
R1‑111274 | Impact of Amplitude Component Together with Long Term Antenna Imbalance on System Level CL Tx Diversity Performance with RAKE receiver, ISD of 2800 m | Renesas Electronics Europe | Revised |
R1‑111275 | Simulation Results for the CoMP Phase 1 Evaluations | CATT | Noted |
R1‑111276 | Further DL CoMP phase1 simulation results | Nokia Siemens Networks, Nokia | Noted |
R1‑111277 | CoMP JT evaluation for Phase I homogenous deployment | Texas Instruments | Noted |
R1‑111278 | CoMP CB/CS evaluation for Phase I homogeneous deployment with high power RRH | Texas Instruments | Noted |
R1‑111279 | Additional evaluation results of downlink CoMP schemes in Scenario 2 | Intel Corporation (UK) Ltd | Revised |
R1‑111280 | Evaluation results of Uplink CoMP in Scenario 2 | Intel Corporation (UK) Ltd | Revised |
R1‑111281 | Performance evaluation of dynamic cell selection in homogeneous networks | Samsung | Noted |
R1‑111282 | Performance evaluation of CoMP JT for Scenario 2 | Samsung | Noted |
R1‑111283 | Preliminary evaluation of DL homogeneous CoMP | Hitachi | Noted |
R1‑111284 | CoMP - Phase 1 Evaluation Results | Motorola Mobility | Noted |
R1‑111285 | Impact of Amplitude Component on System Level CL Tx Diversity Performance with RAKE receiver, ISD of 2800 m and 0 dB long term imbalance | Renesas Electronics Europe | Noted |
R1‑111286 | Impact of Amplitude Component Together with Long Term Antenna Imbalance on System Level CL Tx Diversity Performance with RAKE receiver, ISD of 2800 m | Renesas Electronics Europe | Noted |
R1‑111287 | CoMP Phase 1 evaluation results | Panasonic | Revised |
R1‑111288 | Phase 1 CoMP evaluation results for full buffer | LG Electronics | Noted |
R1‑111289 | Phase 1 CoMP evaluation results for non-full buffer | LG Electronics | Noted |
R1‑111290 | CoMP phase 1 evaluation results | ZTE | Revised |
R1‑111291 | CoMP Evaluation Resuts for Phase 1 | Motorola Solutions | Noted |
R1‑111292 | CoMP Scenario 2 Performance Evaluation: FDD Downlink | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑111293 | CoMP Scenario 2 Performance Evaluation: TDD Downlink | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑111294 | CoMP Scenario 2 Performance Evaluation: Uplink | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑111295 | System performance of JP-CoMP in Homogeneous networks with RRHs | NTT DOCOMO | Noted |
R1‑111296 | System performance of CS/CB-CoMP in Homogeneous networks with RRHs | NTT DOCOMO | Noted |
R1‑111297 | Evaluation results for Phase 1 | Ericsson, ST-Ericsson | Revised |
R1‑111298 | Phase 1 CoMP Evaluation Results | Marvell | Revised |
R1‑111299 | Updated results for Phase 1 CoMP evaluation | Qualcomm Incorporated | Noted |
R1‑111300 | Evaluation results for DL CoMP Phase I | New Postcom | Revised |
R1‑111301 | Simulation results for CoMP Phase I evaluation in homogeneous network | CMCC | Noted |
R1‑111302 | Phase 1 CoMP evaluation results for full buffer | LG Electronics | Noted |
R1‑111303 | LS on CSI reporting and SCell deactivation | RAN2, LGE | Noted |
R1‑111304 | LS on MDT UL Measurements | RAN2, MediaTek | Noted |
R1‑111305 | LS on PDSCH transmission in MBSFN subframes | RAN2, CATT | Noted |
R1‑111306 | Reply LS on Rel-10 UE Categories and Capabilities | RAN4, Motorola | Noted |
R1‑111307 | LS on Rel-10 UE capability for non-contiguous resource allocation | RAN4, NTT DoCoMo | Noted |
R1‑111308 | NGMN coordination between ITU-T and 3GPP on synchronization topic | NGMN, Orange, Tellabs | Noted |
R1‑111309 | 36.211 CR0151 (Rel-8, Cat F) PUSCH interaction with periodic SRS | Ericsson, ST-Ericsson | Withdrawn |
R1‑111310 | 36.211 CR0152 (Rel-9, Cat A) PUSCH interaction with periodic SRS | Ericsson, ST-Ericsson | Withdrawn |
R1‑111311 | 36.211 CR0153 (Rel-10, Cat A) PUSCH interaction with periodic SRS | Ericsson, ST-Ericsson | Revised |
R1‑111312 | 36.213 CR0277 (Rel-10, Cat F) Correction to reception of PRS in MBMS subframes | Ericsson, ST-Ericsson | Noted |
R1‑111313 | Remaning issues of L1 RRC parameters | Ericsson, ST-Ericsson | Not treated |
R1‑111314 | 36.212 CR0103 (Rel-10, Cat F) Correction to non-contiguous resource allocation field | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111315 | 36.212 CR0104 (Rel-10, Cat F) Correction to Multi-cluster flag in DCI format 0 | Ericsson, ST-Ericsson | Revised |
R1‑111316 | 36.213 CR0278 (Rel-10, Cat F) Correction to the definition of P_CMAX,c(i) | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111317 | 36.213 CR0279 (Rel-10, Cat F) Removal of square brackets for PUCCH format 3 ACK/NACK | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111318 | 36.213 CR0280 (Rel-10, Cat F) Removal of square brackets for channel selection when single TB is scheduled | Ericsson, ST-Ericsson | Noted |
R1‑111319 | 36.213 CR0281 (Rel-10, Cat F) Correction of AN repetition and PUCCH format 3 | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111320 | 36.213 CR0282 (Rel-10, Cat F) Correction to timing for secondary cell activation and deactivation | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111321 | 36.212 CR0105 (Rel-10, Cat F) DTX mapping for ACK/NACK on PUSCH | Ericsson, ST-Ericsson | Noted |
R1‑111322 | Soft buffer handling for Rel-10 UEs | Ericsson, ST-Ericsson | Noted |
R1‑111323 | Remaining details for CA based HetNet in Rel-10 | Ericsson, ST-Ericsson | Noted |
R1‑111324 | Remaining details on SRS configuration | Ericsson, ST-Ericsson | Not treated |
R1‑111325 | 36.213 CR0283 (Rel-10, Cat F) Correction on MCS offsets for multiple TBs | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111326 | Evaluation results for phase 1 | Ericsson, ST-Ericsson | Noted |
R1‑111327 | Initial evaluation results for phase 2 | Ericsson, ST-Ericsson | Withdrawn |
R1‑111328 | Configurations for phase 2 | Ericsson, ST-Ericsson | Not treated |
R1‑111329 | Channel modelling for phase 2 evaluations | Ericsson, ST-Ericsson | Noted |
R1‑111330 | Considerations on real-life DL MIMO aspects | Ericsson, ST-Ericsson | Noted |
R1‑111331 | Considerations on scenarios for CSI feedback enhancements | Ericsson, ST-Ericsson | Withdrawn |
R1‑111332 | Enhancements for UE specific control signaling | Ericsson, ST-Ericsson | Not treated |
R1‑111333 | Initial performance evaluation of CS/CB for CoMP Scenario3 | Sony Corporation | Noted |
R1‑111334 | Initial performance evaluation of JP for CoMP Scenario3 | Sony Corporation | Noted |
R1‑111335 | Antenna Calibration for CoMP Reconfiguration Scenario | Sony Corporation | Not treated |
R1‑111336 | LS on further enhancements for CELL_FACH | RAN2, Qualcomm | Noted |
R1‑111337 | LS on signalling support to de-activate HS-SCCH orders | RAN2, Ericsson | Noted |
R1‑111338 | Further discussion on CSI Reporting at SCell activation/deactivation | Texas Instruments | Not treated |
R1‑111339 | Remaining Issues for Aperiodic SRS | Texas Instruments | Noted |
R1‑111340 | 36.213 draft CR (Rel-10, F) on UE behaviour during DM-RS transmission on subframes carrying synchronisation signals | Texas Instruments, Renesas Mobile Europe Ltd., Qualcomm, Nokia, Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Samsung | Noted - Revised |
R1‑111341 | Discussion on Rel.11 DL MIMO Potential Enhancements | Texas Instruments | Noted |
R1‑111342 | Rel.11 DL MIMO Enhancements for Single-Cell with RRHs | Texas Instruments | Noted |
R1‑111343 | Performance Evaluation Results for CoMP Scenario 2 | CHTTL | Revised |
R1‑111344 | 36.213 Draft CR (Rel-10, F) on Timing Requirements for Scell Activation and Deactivation | InterDigital Communications, LLC | Noted |
R1‑111345 | CoMP Phase 1 performance results | InterDigital Communications, LLC | Not treated |
R1‑111346 | Initial CoMP Phase 2 performance results | InterDigital Communications, LLC | Noted |
R1‑111347 | CoMP Joint Transmission using Multiple Redundancy Versions | InterDigital Communications, LLC | Not treated |
R1‑111348 | 36.213 Draft CR (Rel-10, F) on Introduction of P_CMAX for PUSCH power scaling | InterDigital, Ericsson, ST-Ericsson, LG Electronics | Noted - Revised |
R1‑111349 | DL MIMO Enhancements for Geographically Separated Antennas | InterDigital Communications, LLC | Not treated |
R1‑111350 | Study of Open Loop MIMO using UE Specific RS | InterDigital Communications, LLC | Not treated |
R1‑111351 | [Draft] Reply LS on Timing Requirements for SCell Activation and Deactivation and reply LS on on CSI reporting and SCell deactivation | CATT | Withdrawn |
R1‑111352 | [Draft] Reply LS on PDSCH transmission in MBSFN subframes | CATT | Noted - Revised |
R1‑111353 | Miscellaneous corrections for TS36.213 | CATT | Revised |
R1‑111354 | TDD ACK/NAK transmission on PUSCH | CATT | Revised |
R1‑111355 | Draft 36.212 CR on TDD ACK/NAK transmission on PUSCH for carrier aggregation | CATT | Revised |
R1‑111356 | Draft 36.213 CR on TDD ACK/NAK transmission on PUSCH for carrier aggregation | CATT | Revised |
R1‑111357 | Activation/deactivation timing for TDD | CATT | Noted |
R1‑111358 | Draft 36.213 CR on SCell activation and deactivation timing | CATT | Revised |
R1‑111359 | Power scaling for simultaneous SRS transmission on multiple cells | CATT | Noted |
R1‑111360 | ACK/NAK fallback mode for PUCCH format 3 | CATT | Not treated |
R1‑111361 | Remaining issue on PUCCH power control in LTE-A | CATT | Not treated |
R1‑111362 | Draft 36.213 CR on PUCCH mode 1-1 submode 2 codebook subsampling | CATT | Not treated |
R1‑111363 | Remaining issues on SRS triggering via DL grants | CATT | Not treated |
R1‑111364 | Draft 36.211 CR on PDSCH transmission in MBSFN subframes | CATT | Noted - Revised |
R1‑111365 | Simulation Results for the CoMP Phase 1 Evaluations | CATT | Not treated |
R1‑111366 | Initial Evaluation Results for COMP Phase 2 in TDD | CATT | Withdrawn |
R1‑111367 | Considerations on relay backhaul simulation assumptions | CATT | Not treated |
R1‑111368 | CSI feedback enhancement for DL MIMO | CATT | Noted |
R1‑111369 | Introduction of SU MIMO and MU MIMO into multi-carrier HSPA for LCR TDD | TD Tech | Noted |
R1‑111370 | Clarification on HS-SCCH type 1 and HS-SCCH type 2 for LCR TDD | TD Tech | Noted |
R1‑111371 | 25.225 CR0101 (Rel-10, A) Introduction of Cell Portion in AOA measurement for LCR TDD | TD Tech | Noted - Revised |
R1‑111372 | 25.221 CR0213 (Rel-7, F) Clarification of Multiple Uplink Channel Transmission in one timeslot for LCR TDD | TD Tech | Noted |
R1‑111373 | 25.221 CR0214 (Rel-8, A) Clarification of Multiple Uplink Channel Transmission in one timeslot for LCR TDD | TD Tech | Noted |
R1‑111374 | 25.221 CR0215 (Rel-9, A) Clarification of Multiple Uplink Channel Transmission in one timeslot for LCR TDD | TD Tech | Noted |
R1‑111375 | 25.221 CR0216 (Rel-10, A) Clarification of Multiple Uplink Channel Transmission in one timeslot for LCR TDD | TD Tech | Noted |
R1‑111376 | Discussion on CSI reporting for deactivated SCell | Huawei, HiSilicon | Noted |
R1‑111377 | Draft Reply LS on CSI reporting and SCell deactivation | Huawei | Revised |
R1‑111378 | Draft CR 36.212 Clarification on PMI indication in DCI format1B and format 2 | Huawei, HiSilicon | Noted - Revised |
R1‑111379 | 36.213 CR0284 (Rel-10, F) Corrections of UCI multiplexing on PUSCH with aperiodic CSI | Huawei/HiSilicon | Noted |
R1‑111380 | Draft CR 36.213 HARQ-ACK mapping state when format 3 is configured | Huawei, HiSilicon | Noted |
R1‑111381 | Discussion on CA-based HetNet | Huawei, HiSilicon | Noted |
R1‑111382 | Draft CR 36.211 Correction to derivation of comb for SRS | Huawei, HiSilicon | Noted |
R1‑111383 | Draft CR 36.213 correction on PMI/RI reporting and PMI disabling configurations | Huawei, HiSilicon | Withdrawn |
R1‑111384 | Draft CR 36.213 correction on CSI-RS configuration | Huawei, HiSilicon, Nokia, Nokia Siemens Networks | Revised |
R1‑111385 | 36.216 CR0007 (Rel-10, F) Clarifications on R-PDCCH cross interleaving and antenna port selection | Huawei, HiSilicon, Panasonic, Texas Instruments, InterDigital, CATT, Ericsson | Not treated |
R1‑111386 | Ambiguity of DCI format 4 and 2/2A/2B/2C detection | Huawei, HiSilicon | Revised |
R1‑111387 | Draft CR 36.212 Ambiguity of DCI format 4 and 2/2A/2B/2C detection | Huawei, HiSilicon | Revised |
R1‑111388 | Final DL CoMP JP performance evaluation of phase 1 | Huawei, HiSilicon | Not treated |
R1‑111389 | Real-life transmission issues | Huawei, HiSilicon | Noted |
R1‑111390 | Discussion on the necessity of enhanced open-loop MIMO | Huawei, HiSilicon | Not treated |
R1‑111391 | MU enhancements for downlink relay backhaul | Huawei, HiSilicon | Not treated |
R1‑111392 | Evaluation results for DL CoMP Phase I | New Postcom | Noted - Revised |
R1‑111393 | On design of DL CoMP CS/CB | New Postcom | Not treated |
R1‑111394 | Initial evaluation results and discussions for DL CoMP Phase II | New Postcom | Not treated |
R1‑111395 | Evaluation on antenna imbalance effect | Huawei, HiSilicon | Noted |
R1‑111396 | Further codebook analysis and evaluation | Huawei, HiSilicon | Noted |
R1‑111397 | Performance of absolute and recursive feedback methods | Huawei, HiSilicon | Noted |
R1‑111398 | Downlink PCI feedback channel design | Huawei, HiSilicon | Noted |
R1‑111399 | HS-DPCCH performance in soft-handover scenario | Huawei, HiSilicon | Noted |
R1‑111400 | On the choice of PCI feedback determination | Huawei, HiSilicon | Noted |
R1‑111401 | Channelisation code allocation and I/Q mapping for S-DPCCH | Huawei, HiSilicon | Revised |
R1‑111402 | Pilot schemes performance analysis | Huawei, HiSilicon | Noted |
R1‑111403 | On DPDCH and CELL_FACH support for UL CLTD | Huawei, HiSilicon | Noted |
R1‑111404 | System simulation performance for UL CLTD | Huawei, HiSilicon | Not treated |
R1‑111405 | UL CLTD impact on physical layer procedures | Huawei, HiSilicon | Noted |
R1‑111406 | CLTD interaction and performance with CPC | Huawei, HiSilicon | Noted |
R1‑111407 | On different beamforming implementations | Huawei, HiSilicon | Noted |
R1‑111408 | 25.211 CR Introduction of UL CLTD | Huawei, HiSilicon | Withdrawn |
R1‑111409 | 25.212 CR Introduction of UL CLTD | Huawei, HiSilicon | Withdrawn |
R1‑111410 | 25.213 CR Introduction of UL CLTD | Huawei, HiSilicon | Withdrawn |
R1‑111411 | 25.214 CR Introduction of UL CLTD | Huawei, HiSilicon | Withdrawn |
R1‑111412 | 25.215 CR Introduction of UL CLTD | Huawei, HiSilicon | Withdrawn |
R1‑111413 | Considerations on some open issues for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑111414 | HS-DPCCH for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑111415 | HS-SCCH order design for 8C-HSDPA | Huawei, HiSilicon | Noted |
R1‑111416 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in uniform loading and 100% penetration | Huawei, HiSilicon | Noted |
R1‑111417 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in uniform loading and 30% penetration | Huawei, HiSilicon | Noted |
R1‑111418 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in non-uniform loading and 100% penetration | Huawei, HiSilicon | Noted |
R1‑111419 | System Performance Evaluation of Intra-NodeB SF-DC Aggregation in non-uniform loading and 30% penetration | Huawei, HiSilicon | Noted |
R1‑111420 | Summary of SF-DC system simulation performance | Huawei, HiSilicon | Noted |
R1‑111421 | Considerations on DF-DC and DF-4C schemes | Huawei, HiSilicon | Noted |
R1‑111422 | On CSI reporting for the deactivated SCell | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑111423 | Reply to LS on PDSCH transmission in MBSFN subframes | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑111424 | Effects of PCI Feedback Error Rates on Absolute & Recursive Feedback | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111425 | S-DPCCH design for UL Transmit Diversity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111426 | Further analysis of 8C-HSDPA with carrier pairing | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111427 | Evaluation of multi-streaming HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑111428 | Remaining issues on DCI formats | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑111429 | A-SRS triggering bits for TDD - DCI formats 2B/2C | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑111430 | CoMP Scenario 2 Performance Evaluation: FDD Downlink | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑111431 | CoMP Scenario 2 Performance Evaluation: Uplink | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑111432 | CoMP Scenario 2 Performance Evaluation: TDD Downlink | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑111433 | Uplink Power Control considerations for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑111434 | Real-life scenarios for downlink MIMO enhancement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111435 | Downlink MIMO enhancement for CLA antenna configurations | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑111436 | Channel modelling considerations for vertical beamforming | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑111437 | CoMP considerations for TDD | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted - Revised |
R1‑111438 | 25.225 CR0102 (Rel-9, F) Introduction of Cell Portion in AOA measurement for LCR TDD | TD Tech | Noted |
R1‑111439 | Resource Allocation issue of eICIC TDM solution.doc | New PostCom | Withdrawn |
R1‑111440 | Scenarios identification of detection of PCI,MIB,SIB and paging in dominant interference HetNet.doc | New PostCom | Not treated |
R1‑111441 | Remaining issues for DL triggered aperiodic SRS.doc | New PostCom | Not treated |
R1‑111442 | SCell activation/deactivation timing for TDD | Samsung | Noted |
R1‑111443 | PDSCH transmission in MBSFN subframes | Samsung | Noted |
R1‑111444 | TS36.212 CR0106 (Rel-10, F) Updates and Corrections for the DCI Formats | Samsung | Not treated |
R1‑111445 | TS36.212 CR0107 (Rel-10, F) Corrections on HARQ-ACK Channel Coding in the PUSCH | Samsung | Noted - Revised |
R1‑111446 | TS36.213 CR0286 (Rel-10, F) Miscellaneous Corrections | Samsung | Noted - Revised |
R1‑111447 | TS36.213 CR0287 (Rel-10, F) Corrections on UE procedure for Reporting HARQ-ACK | Samsung | Noted |
R1‑111448 | TS36.213 CR0288 (Rel-10, F) Corrections on UE procedure for determining PUCCH Assignment | Samsung | Noted - Revised |
R1‑111449 | Draft CR Update for PUCCH format 3 HARQ-ACK procedure | Samsung | Noted |
R1‑111450 | Resolution of Open Issues in Editor's Notes in TS36.213, v.10.1.0 | Samsung | Not treated |
R1‑111451 | PUCCH Transmission Power with HARQ-ACK Bundling for TDD | Samsung | Noted |
R1‑111452 | HARQ-ACK Codebook Size in PUSCH | Samsung | Not treated |
R1‑111453 | Aperiodic CSI Report Size Ambiguity | Samsung | Noted |
R1‑111454 | HARQ-ACK Multiplexing in PUSCH for “Mode a” and “Mode b” in TDD | Samsung | Not treated |
R1‑111455 | Simultaneous SRS transmissions in more than one cell | Samsung | Noted |
R1‑111456 | Draft 36.213 CR on simultaneous SRS transmissions more than one cell | Samsung | Revised |
R1‑111457 | 36.211 CR0154 (Rel-10, F) Correction on describing PUCCH format 3 | Samsung | Noted - Revised |
R1‑111458 | Reconfiguration handling for HARQ-ACK multiplexing on PUSCH in TDD | Samsung | Withdrawn |
R1‑111459 | Ambiguity of soft buffer size and UE capability for Rel-10 UEs | Samsung | Not treated |
R1‑111460 | Remaining Aspects for Aperiodic SRS Triggering | Samsung | Noted |
R1‑111461 | TS36.211 CR0155 (Rel-10, F) Correction on codebooks for CSI-RS based feedback for up to 4 CSI-RS ports. | Samsung | Noted - Revised |
R1‑111462 | Issue on different REG design for PDCCH and R-PDCCH with cross-interleaving | Samsung | Noted |
R1‑111463 | Draft CR for 36.216: R-PDCCH REG design with cross-interleaving | Samsung | Not treated |
R1‑111464 | Performance evaluation of CoMP JT for Scenario 2 | Samsung | Not treated |
R1‑111465 | Performance evaluation of CoMP dynamic cell selection in scenario 2 (homogeneous networks) | Samsung | Not treated |
R1‑111466 | Full buffer evaluation results for CoMP scenario 3 and 4 | Samsung | Noted |
R1‑111467 | Non-full buffer evaluation results for CoMP scenario 3 and 4 | Samsung | Noted |
R1‑111468 | CQI/PMI enhancement for SU/MU MIMO dynamic switching in Rel-11 | Samsung | Withdrawn |
R1‑111469 | Discussions on CSI-RS port selection for non-uniform networks with low-power nodes | Samsung | Noted |
R1‑111470 | Discussion on CSI feedback enhancement for DL MIMO | Samsung | Not treated |
R1‑111471 | Discussion on downlink control channel enhancements | Samsung | Not treated |
R1‑111472 | Opportunistic coordinated multi-point reception for multi-codeword uplink transmission | I2R | Not treated |
R1‑111473 | 25 224 CR0266 (Rel-10, F) Clarification on SCCPCH selection for LCR TDD | CATT, RIM | Agreed |
R1‑111474 | Simultaneous SRS Transmission on different CCs | Sharp | Noted |
R1‑111475 | Control channel enhancements for single-cell MU-MIMO and CoMP | Sharp | Not treated |
R1‑111476 | Downlink MIMO Enhancements in Rel-11 | Sharp | Not treated |
R1‑111477 | UL-CoMP Rel-11 Proposed Enhancements | Sharp | Not treated |
R1‑111478 | UL MIMO Proposed Enhancements in Rel-11 | Sharp | Not treated |
R1‑111479 | UL RS Proposed Enhancements in Rel-11 | Sharp | Not treated |
R1‑111480 | DRAFT LS on HSDPA Multipoint Transmission | Nokia Siemens Networks | Noted - Revised |
R1‑111481 | UL CLTD feedback loop timing | Nokia Siemens Networks, Nokia | Noted |
R1‑111482 | UL CLTD feedback channel options | Nokia Siemens Networks, Nokia | Noted |
R1‑111483 | UL CLTD code book and feedback rate | Nokia Siemens Networks, Nokia | Noted |
R1‑111484 | Applicability of UL CLTD in Cell_FACH state | Nokia Siemens Networks, Nokia | Noted |
R1‑111485 | UL CLTD implementation | Nokia Siemens Networks, Nokia | Noted |
R1‑111486 | HS-DPCCH design details for 8C-HSDPA | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑111487 | Restructuring of the HSDPA Multipoint Tx TR | Nokia Siemens Networks, Nokia | Agreed in principle |
R1‑111488 | Text Proposal on the performance of HS-DDTx | Nokia Siemens Networks, Nokia | Noted |
R1‑111489 | Text Proposal on the performance of HS-SFN | Nokia Siemens Networks, Nokia | Noted |
R1‑111490 | Text Proposal on the performance of HS-SFN with Feedback | Nokia Siemens Networks, Nokia | Noted |
R1‑111491 | Text Proposal on the performance of Multiflow (SF-DC) | Nokia Siemens Networks, Nokia | Noted |
R1‑111492 | On Multiflow and MIMO coexistence | Nokia Siemens Networks, Nokia | Noted |
R1‑111493 | Uplink MIMO operation principles | Nokia Siemens Networks, Nokia | Noted |
R1‑111494 | Uplink MIMO link level evaluation | Nokia Siemens Networks, Nokia | Noted |
R1‑111495 | Text Proposal on UL MIMO link level performance | Nokia Siemens Networks, Nokia | Noted |
R1‑111496 | Text Proposal on UL MIMO signalling requirements | Nokia Siemens Networks, Nokia | Noted |
R1‑111497 | Flexible Usage of RRHs in CoMP | HTC | Not treated |
R1‑111498 | Carrier Aggregation for HSPA and LTE | HTC | Withdrawn |
R1‑111499 | Remaining issues on AN for LTE-A TDD | ZTE | Not treated |
R1‑111500 | Draft CR for 36.213 10.1 | ZTE | Noted |
R1‑111501 | Text Proposal for PUCCH format 3 when single cell configured in TDD | ZTE | Not treated |
R1‑111502 | Draft CR for 36.213 on HARQ-ACK resource allocation for TDD with channel selection | ZTE | Not treated |
R1‑111503 | Draft CR for 36.213 on Simultanesous transmission of SRS and PUCCH format 2 | ZTE | Noted - Revised |
R1‑111504 | 36.212 CR0108 (Rel-10, F) A clarification for DCI format payload size | ZTE, Fujitsu | Revised |
R1‑111505 | Further consideration on PDSCH starting position | ZTE | Not treated |
R1‑111506 | Power control of PUCCH for LTE-A TDD | ZTE | Not treated |
R1‑111507 | Remaining issues related to CA during random access procedure in LTE-A | ZTE | Noted |
R1‑111508 | On ordering and segmentation of HARQ-ACK bits | ZTE | Not treated |
R1‑111509 | Draft CR for 36.212 5.2.2 | ZTE | Revised |
R1‑111510 | Power control for SRSs simultaneous transmission on different CCs | ZTE | Noted |
R1‑111511 | A-SRS remaining issues | ZTE | Noted |
R1‑111512 | 36.216 CR0003 (Rel-10, F) on DMRS overhead UL grant | ZTE | Not treated |
R1‑111513 | 36.216 CR0004 (Rel-10, F) on muted CSI-RS for REG | ZTE | Revised |
R1‑111514 | 36.216 CR0005 (Rel-10, F) on RA overlap | ZTE | Not treated |
R1‑111515 | 36.216 CR0006 (Rel-10, F) on Un TDD UL grant timing | ZTE | Not treated |
R1‑111516 | CoMP Phase 1 JP Evaluation Results | ZTE | Not treated |
R1‑111517 | CoMP Phase 1 CSCB Evaluation Results | ZTE | Noted |
R1‑111518 | Initial evaluation results for CoMP Phase 2 | ZTE | Not treated |
R1‑111519 | Issues on RI and CQI selection | ZTE | Withdrawn |
R1‑111520 | Impact of antenna calibration | ZTE | Revised |
R1‑111521 | Aspects on DL control signaling enhancements | ZTE | Not treated |
R1‑111522 | Discussion on CSI Feedback in non-uniform Network | ZTE | Not treated |
R1‑111523 | Discussion on codebook enhancement under 4Tx widely spaced XPOL antennas | ZTE | Not treated |
R1‑111524 | CSI reporting and resource size considering activation status | ASUSTeK | Not treated |
R1‑111525 | PUSCH resource mapping for Msg3 in UE-specific aperiodic SRS subframe | ASUSTeK | Not treated |
R1‑111526 | Channel interleaving for Msg3 in UE-specific aperiodic SRS subframe | ASUSTeK | Not treated |
R1‑111527 | Number of HARQ process for UL spatial multiplexing | ASUSTeK | Noted - Revised |
R1‑111528 | Simulation evaluation for scenarios 3 and 4 | MediaTek Inc. | Noted |
R1‑111529 | On cross carrier scheduling of group power control | MediaTek Inc. | Not treated |
R1‑111530 | Practical aspects and deployment considerations of DL MIMO | MediaTek Inc. | Noted |
R1‑111531 | Discussion on PDCCH Enhancement for DL MU-MIMO and CoMP | MediaTek Inc. | Not treated |
R1‑111532 | On the choice of DL physical channel to carry UL PCI feedback | Qualcomm Incorporated | Noted |
R1‑111533 | Dynamic control of UL CLTD via HS-SCCH orders | Qualcomm Incorporated | Noted |
R1‑111534 | Enhanced Symmetric Beamforming for UL CLTD | Qualcomm Incorporated | Noted |
R1‑111535 | Link Analysis of S-DPCCH gating for UL CLTD | Qualcomm Incorporated | Noted |
R1‑111536 | UE power scaling algorithms when UL CLTD is configured | Qualcomm Incorporated | Noted |
R1‑111537 | Impact to RAN1 Specifications due to UL CLTD | Qualcomm Incorporated | Not treated |
R1‑111538 | System Performance Evaluation of SF-DC Inter NodeB aggregation in uniform loading scenario- 100% penetration assuming realistic RLC and flow control | Qualcomm Incorporated | Noted |
R1‑111539 | System Performance Evaluation of SF-DC Inter NodeB aggregation in uniform loading scenario - 30% penetration assuming realistic RLC and flow control | Qualcomm Incorporated | Noted |
R1‑111540 | System Performance Evaluation of SF-DC Inter NodeB aggregation in non-uniform loading scenario- 100% penetration assuming realistic RLC and flow control | Qualcomm Incorporated | Noted |
R1‑111541 | System Performance Evaluation of SF-DC Inter NodeB aggregation in non-uniform loading scenario-30% assuming realistic RLC and flow control | Qualcomm Incorporated | Noted |
R1‑111542 | Summary of System Performance Evaluation of SF-DC aggregation schemes assuming realistic RLC and flow control | Qualcomm Incorporated | Noted |
R1‑111543 | System evaluation of HS-SFN | Qualcomm Incorporated | Noted |
R1‑111544 | Summary of Findings on System Performance Evaluation of HSDPA MP Tx Schemes | Qualcomm Incorporated | Noted |
R1‑111545 | TP on System Performance Evaluation of SF-DC aggregation and switching schemes assuming ideal RLC and flow control | Qualcomm Incorporated | Noted - Revised |
R1‑111546 | TP on Synchronization and Time Alignment requirements due to HSDPA MP-TX | Qualcomm Incorporated | Agreed |
R1‑111547 | TP on Impact to UE Implementation due to HSDPA MP-Tx | Qualcomm Incorporated | Agreed |
R1‑111548 | TP on Impact to RAN Specifications due to HSDPA MP-Tx | Qualcomm Incorporated | Noted - Revised |
R1‑111549 | void | - | Withdrawn |
R1‑111550 | Performance Analysis of UL MIMO using 2 transport blocks | Qualcomm Incorporated | Noted |
R1‑111551 | Revision to draft skeleton 25.871 TR on UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑111552 | TP on Simulation Methodology for UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑111553 | TP on Impact to UE and UTRAN implementation due to UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑111554 | TP on Physical Layer Structure Alternatives due to UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑111555 | Further Enhancements to CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑111556 | System Level CL Tx Diversity Performance with Absolute and Recursive Feedback Methods, RAKE receiver and ISD of 2800 m | Renesas Mobile Europe Ltd | Noted |
R1‑111557 | System Performance Evaluation of SF-DC Intra-NB aggregation with Type 3 and Type 3i receivers | Renesas Mobile Europe Ltd | Noted |
R1‑111558 | System Level CQI considerations on SF-DC Intra-NB aggregation | Renesas Mobile Europe Ltd | Noted |
R1‑111559 | 36.211 CR0156 (Rel-10, F) Correction on overlapping non-zero-power and zero-power CSI-RS configurations | Renesas Mobile Europe Ltd, Texas Instruments, ZTE, Samsung, LG Electronics, Huawei, HiSilicon, Research In Motion, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks | Agreed |
R1‑111560 | System Performance Evaluation for Scenario 2 | Renesas Mobile Europe Ltd | Withdrawn |
R1‑111561 | Coordinated transmission in support of interference aware receivers | Renesas Mobile Europe Ltd | Not treated |
R1‑111562 | Interference aware receiver modeling at system level | Renesas Mobile Europe Ltd | Not treated |
R1‑111563 | System level results on UE MMSE receiver modeling | Renesas Mobile Europe Ltd | Not treated |
R1‑111564 | Issues from real-life DL MIMO implementations | Renesas Mobile Europe Ltd | Noted |
R1‑111565 | DL MIMO enhancements for different deployments and scenarios | Renesas Mobile Europe Ltd | Not treated |
R1‑111566 | UE CSI feedback enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑111567 | On control signaling enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑111568 | Need for standardized open-loop MIMO with UE-specific RS | Renesas Mobile Europe Ltd | Not treated |
R1‑111569 | Corrections on UE procedure for reporting CSI and HARQ-ACK | Potevio | Noted - Revised |
R1‑111570 | Corrections for CA in 36.213 | Potevio | Revised |
R1‑111571 | Clarifications to dedicated carrier for MBSFN | Potevio, ZTE, NewPostcom | Noted |
R1‑111572 | Implement open-loop scheme for TM9 | Potevio | Not treated |
R1‑111573 | PDSCH transmission in MBSFN subframes | Panasonic | Noted |
R1‑111574 | CSI reporting for deactivated carriers | Panasonic | Noted |
R1‑111575 | Number of Ack/Nack bits in TDD multiplexing for PUSCH with M=1 | Panasonic | Noted |
R1‑111576 | ACK/NACK and CQI simultaneous transmission in ACK/NACK bundling in TDD | Panasonic | Noted - Revised |
R1‑111577 | Simultaneous SRS transmission on multiple component carriers | Panasonic | Noted |
R1‑111578 | Remaining issues on aperiodic SRS triggering | Panasonic | Not treated |
R1‑111579 | Fix for multi-cluster allocation in DCI format 0 and 4 | Panasonic | Noted |
R1‑111580 | Clarification on single codeword multiple layer transmission in uplink | Panasonic | Not treated |
R1‑111581 | Clarification of "supportedMIMO-CapabilityDL" | Panasonic | Noted - Revised |
R1‑111582 | Clarification of priority between PMCH and PDSCH reception | Panasonic | Noted |
R1‑111583 | Uplink DMRS sequence for RACH procedure | Panasonic | Agreed |
R1‑111584 | Further update of CoMP Phase 1 evaluation results for JT with non full buffer traffic model | Panasonic | Noted - Revised |
R1‑111585 | Further update of CoMP Phase 1 evaluation results for CB | Panasonic | Noted |
R1‑111586 | DMRS sequence for CoMP scenario 4 | Panasonic | Not treated |
R1‑111587 | Flexible CoMP Operation based on Dedicated CSI-RS Configuration | Panasonic | Not treated |
R1‑111588 | CSI Feedback Enhancements in Rel-11 DL MIMO | Panasonic | Not treated |
R1‑111589 | Considerations on PDCCH Enhancements for Release 11 | Panasonic | Not treated |
R1‑111590 | Updated Additional evaluation results of downlink CoMP schemes in Scenario 2 | Intel Corporation | Noted |
R1‑111591 | Updated evaluation results of Uplink CoMP in Scenario 2 | Intel Corporation | Not treated |
R1‑111592 | Evaluation results of Downlink JP-CoMP with MU-MIMO in Scenario 2 | Intel Corporation | Not treated |
R1‑111593 | CSI-RS configuration/reconfiguration in distributed RRH systems | Intel Corporation | Not treated |
R1‑111594 | Discussions on UE-RS Based PDCCH | Intel Corporation | Not treated |
R1‑111595 | 4Tx codebook/feedback enhancement | Intel Corporation | Noted |
R1‑111596 | Real life issues for DL-MIMO | Intel Corporation | Noted |
R1‑111597 | Discussions of UE-RS Based Open Loop MIMO | Intel Corporation | Not treated |
R1‑111598 | Uplink Power Control Discussion for CoMP Scenario 4 | Intel Corporation | Not treated |
R1‑111599 | Proposal for a study item in support of low complexity LTE devices for MTC | IPWireless Inc. | Noted |
R1‑111600 | Further Phase-1 Evaluations of Joint Transmission and DCS Schemes | Motorola Mobility | Revised |
R1‑111601 | Phase 1 Evaluations of Coordinated Beamforming/Scheduling | Motorola Mobility | Not treated |
R1‑111602 | Discussion on RRH Deployment with Single Cell ID | Motorola Mobility | Not treated |
R1‑111603 | Discussion on DL-MIMO Enhancement for Release 11 | Motorola Mobility | Noted |
R1‑111604 | Options for S-DPCCH design | InterDigital Communications, LLC | Noted |
R1‑111605 | UL CLTD Support in Cell_FACH | InterDigital Communications, LLC | Noted |
R1‑111606 | Simulation results and evaluation of feedback channel requirements with PCI errors | InterDigital Communications, LLC | Noted |
R1‑111607 | Selection of Channelization codes for HS-DPCCH in 8-carrier HSDPA | InterDigital Communications, LLC | Noted |
R1‑111608 | Carrier activation/deactivation for 8-Carrier HSDPA | InterDigital Communications, LLC | Noted |
R1‑111609 | System performance comparison of SF-DC aggregation and HS-SFN for MP-HSDPA | InterDigital Communications, LLC | Noted |
R1‑111610 | SF-DC aggregation system performance evaluation for MP-HSDPA | InterDigital Communications, LLC | Noted |
R1‑111611 | HS-SFN system performance evaluation for HSDPA MP | InterDigital Communications, LLC | Noted |
R1‑111612 | Considerations on standalone HS-DPCCH in CELL_FACH state | InterDigital Communications, LLC | Not treated |
R1‑111613 | Discussion on the need for UL interference control mechanisms in CELL_FACH state | InterDigital Communications, LLC | Not treated |
R1‑111614 | Discussion on ‘LS on CSI reporting and SCell deactivation’ | LG Electronics | Not treated |
R1‑111615 | Remaining issues on simultaneous SRSs on more than one carrier | LG Electronics | Noted |
R1‑111616 | Remaining details on UCI combination | LG Electronics | Noted |
R1‑111617 | Correction to table for TDD mode b with M=2 | LG Electronics | Not treated |
R1‑111618 | Correction to handling of search space overlap | LG Electronics | Noted - Revised |
R1‑111619 | ACK/NACK piggyback on PUSCH in TDD | LG Electronics | Noted |
R1‑111620 | Remaining issue on UL resource allocation | LG Electronics | Noted |
R1‑111621 | 36.216 Draft CR for Clarification on UE-specific RS transmission in Un link | LG Electronics | Not treated |
R1‑111622 | 36.216 Draft CR for Clarification on RS overhead assumption in decoding R-PDCCH UL grant | LG Electronics | Not treated |
R1‑111623 | 36.216 Draft CR for Clarification on CQI definition | LG Electronics | Not treated |
R1‑111624 | 36.216 Draft CR for No R-PDCCH in the second slot of a PRB pair assigned to PDSCH | LG Electronics | Not treated |
R1‑111625 | 36.216 Draft CR for Clarification on R-PDCCH Search Space VRB-to-PRB Mapping | LG Electronics | Not treated |
R1‑111626 | 36.216 Draft CR for Correction on the Relay Nodes Behaviour for CSI report and SRS transmission | LG Electronics | Revised |
R1‑111627 | 36.213 Draft CR for Clarification on PRB bundling | LG Electronics | Noted |
R1‑111628 | Phase 1 CoMP Simulation Evaluation Results and Analysis for full buffer | LG Electronics | Not treated |
R1‑111629 | Phase 1 CoMP Simulation Evaluation Results and Analysis for non-full buffer | LG Electronics | Not treated |
R1‑111630 | Simulation Parameter Alignment for Phase 2 CoMP evaluation | LG Electronics | Noted |
R1‑111631 | Initial simulation results for scenario 3 | LG Electronics | Not treated |
R1‑111632 | CQI PMI feedback for CoMP | LG Electronics | Not treated |
R1‑111633 | Further evaluation of soft buffer partitioning for CA | NTT DOCOMO | Noted |
R1‑111634 | Remaining issues on UE category | NTT DOCOMO | Revised |
R1‑111635 | Initial views on CSI feedback enhancement for Rel-11 DL MIMO | NTT DOCOMO | Noted |
R1‑111636 | DL control channel enhancement for DL MIMO in Rel-11 | NTT DOCOMO | Noted |
R1‑111637 | System performance of JP-CoMP in Homogeneous network with RRHs | NTT DOCOMO | Not treated |
R1‑111638 | System performance of CS/CB-CoMP in Homogeneous network with RRHs | NTT DOCOMO | Not treated |
R1‑111639 | Influence of channel estimation error on MMSE-IRC receiver | NTT DOCOMO | Not treated |
R1‑111640 | Model for CSI-RS channel estimation error | NTT DOCOMO | Not treated |
R1‑111641 | Investigation of specification impact of Rel. 11 CoMP | NTT DOCOMO | Not treated |
R1‑111642 | On CSI ambiguity handling with activation/deactivation | Pantech | Not treated |
R1‑111643 | Remaining details for channel selection in TDD | Pantech | Withdrawn |
R1‑111644 | Remaining details for UCI transmission on PUCCH | Pantech | Not treated |
R1‑111645 | Remaining details of resource allocation for PUCCH format 3 in TDD | Pantech | Not treated |
R1‑111646 | Remaining issues on Aperiodic SRS triggering | Pantech | Not treated |
R1‑111647 | Clarification on signalling for CSI-RS configuration | Pantech | Not treated |
R1‑111648 | CSI feedback for CoMP in different Scenarios | Pantech | Not treated |
R1‑111649 | Codeword configuration and DM-RS layer mapping for DL CoMP | Pantech | Withdrawn |
R1‑111650 | DL signaling to enhance MU MIMO operation | Pantech | Not treated |
R1‑111651 | Multiple codebooks for CSI feedback to enhance MIMO operation | Pantech | Not treated |
R1‑111652 | Antenna configuration and CSI feedback for low power nodes in heterogeneous network | Pantech | Not treated |
R1‑111653 | DCI format for Rel-11 single cell MIMO | Pantech | Not treated |
R1‑111654 | CSI feedback for Rel-11 single cell MIMO | Pantech | Not treated |
R1‑111655 | Discussion on demodulation RS for DL MIMO enhancements | Pantech | Not treated |
R1‑111656 | Inconsistency between RAN1 and RAN2 specs on SPS in CA | NEC Group | Noted |
R1‑111657 | Draft CR to 36.213 | NEC Group | Noted |
R1‑111658 | Views on transmission schemes for downlink MIMO enhancements | NEC Group | Not treated |
R1‑111659 | Enhancements to DL MU-MIMO CSI feedback | NEC Group | Not treated |
R1‑111660 | void | - | Withdrawn |
R1‑111661 | PDCCH Enhancement Considerations | Research In Motion UK Limited | Not treated |
R1‑111662 | Downlink CSI Feedback for Low Power Node | Research In Motion UK Limited | Not treated |
R1‑111663 | Corrections In Power Headroom | Research In Motion UK Limited | Noted - Revised |
R1‑111664 | CSI Reporting During SCell Activation/Deactivation | Research In Motion UK Limited | Not treated |
R1‑111665 | Simultaneous SRS Transmission In Carrier Aggregation | Research In Motion UK Limited | Noted |
R1‑111666 | CSI payload ordering for carrier aggregation | Research In Motion UK Limited | Not treated |
R1‑111667 | Further discussion on Cross-carrier Scheduling for LTE Rel10 | Motorola Mobility | Noted |
R1‑111668 | Soft Buffer Partitioning | Motorola Mobility | Not treated |
R1‑111669 | Draft CR to 36.212 on Resource dimensioning for CQI only PUSCH transmission | Motorola Mobility | Noted - Revised |
R1‑111670 | Further discussion on remaining details of aperiodic SRS | Motorola Mobility | Not treated |
R1‑111671 | Draft LS reply on definition of ABS | Qualcomm Incorporated | Noted |
R1‑111672 | Soft buffer partitioning for CA | Qualcomm Incorporated | Not treated |
R1‑111673 | Cross carrier scheduling | Qualcomm Incorporated | Noted |
R1‑111674 | Power prioritization of SRS transmissions over multiple CCs | Qualcomm Incorporated | Not treated |
R1‑111675 | Clarification of CSI feedback for deactivated CCs | Qualcomm Incorporated | Noted |
R1‑111676 | Clarification of parallel PUCCH and PUSCH transmission | Qualcomm Incorporated | Revised |
R1‑111677 | Handling of PRACH power prioritization in CA | Qualcomm Incorporated | Withdrawn |
R1‑111678 | Handling of same DCI format size of DL and UL grants | Qualcomm Incorporated | Noted |
R1‑111679 | Miscellaneous corrections to 36.212 | Qualcomm Incorporated | Noted |
R1‑111680 | Miscellaneous corrections to 36.213 | Qualcomm Incorporated | Noted |
R1‑111681 | UL antenna switch in conjunction with CA | Qualcomm Incorporated | Noted |
R1‑111682 | Aperiodic SRS triggering in DCI format 2B/2C in TDD | Qualcomm Incorporated | Not treated |
R1‑111683 | Draft CR for UE antenna swicth in UL MIMO | Qualcomm Incorporated | Noted - Revised |
R1‑111684 | Evaluation results for Phase 1 | Qualcomm Incorporated | Not treated |
R1‑111685 | Preliminary CoMP evaluation results for Scenarios 3 and 4 | Qualcomm Incorporated | Revised |
R1‑111686 | Comparison of CoMP Scenarios 3 and 4 | Qualcomm Incorporated | Noted |
R1‑111687 | Issues from real-life DL MIMO deployments | Qualcomm Incorporated | Noted |
R1‑111688 | DL MIMO feedback enhancements | Qualcomm Incorporated | Not treated |
R1‑111689 | Open loop DL MIMO | Qualcomm Incorporated | Not treated |
R1‑111690 | Resource Allocation for SPS in FDD Channel Selection | LG Electronics | Noted |
R1‑111691 | Simultaneous Transmission of SR and A/N for PUCCH format 3 | LG Electronics | Noted |
R1‑111692 | Remaining Issues on Resource Allocation for TDD PUCCH format 3 | LG Electronics | Not treated |
R1‑111693 | HARQ-ACK treatment for undetected TB for PUCCH format 3 | LG Electronics | Noted |
R1‑111694 | 36.213 Draft CR on HARQ-ACK treatment for undetected TB for PUCCH format 3 | LG Electronics | Not treated |
R1‑111695 | Correction on Simultaneous PUCCH and SRS Transmissions on CA | LG Electronics | Noted - Revised |
R1‑111696 | Power control for SR and ACK/NACK with PUCCH format 3 | LG Electronics | Noted - Revised |
R1‑111697 | Remaining Issues for Aperiodic SRS on TDD | LG Electronics | Not treated |
R1‑111698 | Correction on Implicit Derivation of Transmission Comb per Antenna Port for SRS | LG Electronics, Panasonic, Ericsson, ST-Ericsson | Noted - Revised |
R1‑111699 | Correction on the Channel Interleaver of PUSCH | LG Electronics | Withdrawn |
R1‑111700 | Remaining Issues on UL Transmission Mode | LG Electronics | Not treated |
R1‑111701 | Correction on 8Tx Codebook Sub-sampling for PUCCH Mode 1-1 | LG Electronics | Noted - Revised |
R1‑111702 | Remaining Issues on CSI-RS | LG Electronics | Noted |
R1‑111703 | Considerations on Rel-11 Downlink MIMO Enhancement | LG Electronics | Not treated |
R1‑111704 | Downlink CSI feedback accuracy enhancement for MU-MIMO | KDDI | Revised |
R1‑111705 | Soft buffer partitioning in carrier aggregation | ITRI | Not treated |
R1‑111706 | ACK/NACK repetition for TDD PUCCH Format 3 in single-cell configuration | ITRI | Not treated |
R1‑111707 | Further consideration on CQI reporting at Scell activation | ITRI | Not treated |
R1‑111708 | Discussions on CoMP scenario 3 | ITRI | Not treated |
R1‑111709 | Analysis of design consideration for scenario 4 | ITRI | Not treated |
R1‑111710 | Support of ABS/MBSFN subframe for scenario 4 | ITRI | Not treated |
R1‑111711 | Clarification for the definition of CQI | ITRI | Noted - Revised |
R1‑111712 | Clarification for the definition of precoding matrix indicator | ITRI | Noted - Revised |
R1‑111713 | Correction on UE behaviour upon reporting periodic CSI using PUCCH Mode1-1 | ITRI | Revised |
R1‑111714 | Non-coherent Frequency Error Impact of Joint Transmission | Institute for Information Industry (III), Coiler Corporation | Noted |
R1‑111715 | CSI feedback reduction in practical deployments | Telefonica | Noted |
R1‑111716 | RA Response in MBSFN subframes | LG Electronics | Noted |
R1‑111717 | CoMP JT evaluation for Phase I homogenous deployment | Texas Instruments | Not treated |
R1‑111718 | CoMP CB/CS evaluation for Phase I homogeneous deployment with high power RRH | Texas Instruments | Not treated |
R1‑111719 | DCI format padding in LTE | Fujitsu, ZTE | Noted |
R1‑111720 | DCI format size ambiguity in LTE | Fujitsu | Noted |
R1‑111721 | Discussion of antenna virtualization schemes in DL JP CoMP | Fujitsu | Not treated |
R1‑111722 | Primary evaluation for JP CoMP of Scenario 3 | Fujitsu | Not treated |
R1‑111723 | Further consideration on CoMP Scenario 4 | Fujitsu | Not treated |
R1‑111724 | Consideration on UL CoMP | Fujitsu | Not treated |
R1‑111725 | Discussion on DL MU-MIMO in Rel.11 | Fujitsu | Not treated |
R1‑111726 | Consideration on DL-MIMO enhancements for practical antenna configurations | Fujitsu | Not treated |
R1‑111727 | Way forward on coordination between ITU-T and 3GPP on synchronization | Orange | Revised |
R1‑111728 | CSI reporting Ambiguity handling at SCell deactivation | Nokia Siemens Networks, Nokia | Noted |
R1‑111729 | Pcmax in power headroom reporting | Nokia Siemens Networks, Nokia | Noted |
R1‑111730 | Remaining Issues on Un Subframe Configuration | Nokia Siemens Networks, Nokia | Not treated |
R1‑111731 | Remaining issues on the UL Backhaul | Nokia Siemens Networks, Nokia | Not treated |
R1‑111732 | Draft CR: Clarifications on Un subframe configuration, SRS, periodic CSI, and UL ACK/NACK | Nokia Siemens Networks, Nokia | Revised |
R1‑111733 | CoMP phase1 performance evaluation summary | Nokia Siemens Networks, Nokia | Not treated |
R1‑111734 | DL CoMP phase1 simulation results for CS/CB | Nokia Siemens Networks, Nokia | Not treated |
R1‑111735 | System level performance of Coordinated scheduling for heterogeneous networks | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑111736 | DL CoMP phase2 simulation results for CS/CB | Nokia Siemens Networks, Nokia | Not treated |
R1‑111737 | Cell aggregation: A unified approach to CoMP and carrier aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑111738 | UL CoMP Performance in Scenario 1 and Scenario 2 | Nokia Siemens Networks, Nokia | Not treated |
R1‑111739 | UL CoMP performance w/o inter-cell orthogonal reference signal | Nokia Siemens Networks, Nokia | Not treated |
R1‑111740 | Downlink control channels transmission with antenna arrays | Nokia Siemens Networks, Nokia | Noted |
R1‑111741 | MIMO Observations from 8x8 Field Measurements at 770 MHz and 3.5 GHz | Nokia Siemens Networks, Nokia | Noted |
R1‑111742 | On Rel-11 DL MIMO enhancements for different scenarios | Nokia, Nokia Siemens Networks | Not treated |
R1‑111743 | On enhanced downlink control signalling for Rel-11 | Nokia, Nokia Siemens Networks | Not treated |
R1‑111744 | On DL MIMO for geographically separated TX points | Nokia, Nokia Siemens Networks | Noted |
R1‑111745 | Considerations for CoMP Operation | HTC | Revised |
R1‑111746 | Discussion on CoMP Feedback for Transmission Enhancement | HTC | Withdrawn |
R1‑111747 | On the interaction between HS-SCCH orders and RRC reconfigurations for DC-HSUPA | Ericsson, ST-Ericsson | Noted |
R1‑111748 | On the interaction between HS-SCCH orders and RRC reconfigurations for MC-HSDPA | Ericsson, ST-Ericsson, Qualcomm Incorporated | Noted |
R1‑111749 | 25.214 CRxxxx (Rel-9, F) Clarification of Secondary_Cell_Active when Secondary_Cell_Enabled is changed from 0 to 1 | Ericsson, ST-Ericsson, Qualcomm Incorporated | Noted - Revised |
R1‑111750 | Remaining design considerations for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111751 | Power scaling for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑111752 | On the quality of PCI feedback in CLTD | Ericsson, ST-Ericsson | Not treated |
R1‑111753 | Carrier (de)activation for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111754 | On the HS-SCCH decoding performance for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111755 | Further cubic metric analysis for HS-DPCCH in 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111756 | Further considerations on HS-DPCCH for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑111757 | 25.211 CR0288 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Not treated |
R1‑111758 | 25.212 CR0296 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Not treated |
R1‑111759 | 25.213 CR0109 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Not treated |
R1‑111760 | 25.214 CR0652 (rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Not treated |
R1‑111761 | Initial performance evaluation of UL MIMO | Ericsson,. ST-Ericsson | Noted |
R1‑111762 | Simulation results for SF-DC-HSDPA with bursty fraffic | Ericsson, ST-Ericsson | Withdrawn |
R1‑111763 | 4-branch MIMO for HSDPA | Ericsson | Noted |
R1‑111764 | On further enhancements to CELL_FACH | Ericsson, ST-Ericsson | Not treated |
R1‑111765 | 36.213 CR0289 (Rel-10, Cat F) Correction to Multi-cluster flag in DCI format 0 | Ericsson, ST-Ericsson | Revised |
R1‑111766 | 36.213 CR0290 (Rel-10, Cat F) Joint transmission of ACK/NACK and SR with PUCCH format 3 | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111767 | 36.212 CR0109 (Rel-10, Cat F) Alignment of DCI format sizes for DCI format 0/1A/3/3A | Ericsson, ST-Ericsson | Noted |
R1‑111768 | 36.212 CR0110 (Rel-10, Cat F) Correction the search space and RNTI for CQI and SRS request flag | Ericsson, ST-Ericsson | Revised |
R1‑111769 | PUSCH interaction with periodic SRS | Ericsson, ST-Ericsson | Withdrawn |
R1‑111770 | 36.213 CR0291 (Rel-10, Cat F) Correction to non-contiguous resource allocation field | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111771 | Draft reply LS on PDSCH transmission in MBSFN subframes | Huawei | Noted |
R1‑111772 | Soft buffer partition for Rel-10 | Huawei, HiSilicon | Not treated |
R1‑111773 | Draft CR to TS 36.213: Acquiring synch in CA-based HetNet operations | Ericsson, ST-Ericsson | Noted |
R1‑111774 | Draft LS to RAN2: RRC signaling for acquiring synchronization of SCell in heterogeneous deployments | Ericsson, ST-Ericsson | Not treated |
R1‑111775 | Signaling and configuration for the multi-point transmissions schemes | Nokia Siemens Networks, Nokia | Noted |
R1‑111776 | Accounting for CSI overhead in CoMP evaluations | InterDigital Communications, LLC | Not treated |
R1‑111777 | Relay Backhaul MIMO Channel Model | CMCC | Not treated |
R1‑111778 | Application Scenario of dynamic UL/DL asymmetry for TDD system | CMCC | Not treated |
R1‑111779 | LS on UE receiver window for Inter-band non-contiguous CA | RAN4, NTT DoCoMo | Noted |
R1‑111780 | MDT UL Measurements | RAN4, Ericsson | Noted |
R1‑111781 | LS on Pcmax definition and power scaling in TS 36.213 Rel-10 | RAN4, InterDigital | Noted |
R1‑111782 | LS on UL-MIMO UE capability on relative phase continuity | RAN4, Qualcomm, Huawei | Noted |
R1‑111783 | Including Pcmax in the Power Headroom Reporting | MediaTek Inc. | Noted |
R1‑111784 | Discussion on the Support of Downlink Physical Channels in CoMP Scenario 4 | MediaTek Inc. | Not treated |
R1‑111785 | Phase 1 CoMP Evaluation Results | Marvell | Noted |
R1‑111786 | Clarification on CQI reference resource considering R-PDCCH | ZTE | Not treated |
R1‑111787 | Corrections for CA in 36.213 | Potevio | Noted |
R1‑111788 | Discussions on CSI feedback enhancement | LG Electronics | Not treated |
R1‑111789 | Discussions on DL control signaling enhancement | LG Electronics | Not treated |
R1‑111790 | Draft CR 36.213: UE specific disabling of UL DMRS sequence hopping | Panasonic | Revised |
R1‑111791 | Reply LS on Network Sharing | SA2, Orange | Noted |
R1‑111792 | Indoor/Outdoor Channel Modeling for HetNet CoMP evaluations | LG Electronics | Not treated |
R1‑111793 | PDCCH capacity and overhead analysis for CoMP Scenarios 3 and 4 | LG Electronics | Noted |
R1‑111794 | Performance Evaluation Results for CoMP Scenario 2 | CHTTL | Not treated |
R1‑111795 | Application of antenna selection for CA | CATT | Noted |
R1‑111796 | [Draft] Reply LS on Timing Requirements for SCell Activation and Deactivation | CATT, Huawei, HiSilicon, CMCC, ITRI, Potevio, ZTE | Not treated |
R1‑111797 | Draft 36.213 CR on SCell activation and deactivation timing | CATT, Huawei, HiSilicon, CMCC, ITRI, Potevio, ZTE | Not treated |
R1‑111798 | TDD ACK/NAK transmission on PUSCH | CATT, CATR, Intel, ITRI, Potevio | Noted |
R1‑111799 | 36.212 CR0108R1 (Rel-10, F) A clarification for DCI format payload size | ZTE, Fujitsu | Noted - Revised |
R1‑111800 | Channelisation code allocation and I/Q mapping for S-DPCCH | Huawei, HiSilicon | Noted |
R1‑111801 | Evaluation results for DL CoMP Phase I | New Postcom | Not treated |
R1‑111802 | Correction on UE behaviour upon reporting periodic CSI using PUCCH Mode1-1 | ITRI | Noted - Revised |
R1‑111803 | Clarification of parallel PUCCH and PUSCH transmission | Qualcomm Incorporated | Noted |
R1‑111804 | Draft CR 36.213 on HARQ-ACK resource allocation for TDD mode a | Huawei, HiSilicon, ZTE, CMCC, Potevio, New Postcom | Not treated |
R1‑111805 | 36.213 CR0292 (Rel-10,F) Correction on CSI-RS configuration | Huawei, HiSilicon, Nokia, Nokia Siemens Networks, Renesas Mobile Europe Ltd, Texas Instruments, Research in Motion, Motorola Mobility, Samsung, LG Electronics, CATT, ZTE | Not treated |
R1‑111806 | 36.211 CR0157 (Rel-10,F) correction on CSI-RS configuration | Huawei, HiSilicon, CATT, ZTE, Samsung, LG Electronics, Renesas Mobile Europe Ltd, Nokia, Nokia Siemens Networks, Research in Motion, Texas Instruments | Agreed |
R1‑111807 | 36.212 CR0104R1 (Rel-10, Cat F) Correction to Multi-cluster flag in DCI format 0 | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111808 | 36.213 CR0289R1 (Rel-10, Cat F) Correction to Multi-cluster flag in DCI format 0 | Ericsson, ST-Ericsson | Revised |
R1‑111809 | 36.212 CR0110R1 (Rel-10, Cat F) Correction the search space and RNTI for CQI and SRS request flag | Ericsson, ST-Ericsson | Agreed |
R1‑111810 | Way forward on coordination between ITU-T and 3GPP on synchronization | Orange | Noted |
R1‑111811 | On RAN enhancements for MTC in Rel-11 | ZTE | Noted |
R1‑111812 | Skeleton TR for Downlink MIMO Enhancement Study Item | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑111813 | [Draft] LS to RAN (cc RAN3, RAN4) on coordination between ITU-T and 3GPP on synchronization | Alcatel-Lucent | Noted - Revised |
R1‑111814 | 36.211 CR0153R1 (Rel-10, Cat F) PUSCH interaction with periodic SRS | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111815 | 36.213 CR0293 (Rel-10, F) A clarification on PDSCH and transmission mode 9 | ZTE | Noted |
R1‑111816 | On CSI reporting for the deactivated SCell | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑111817 | Reply to LS on PDSCH transmission in MBSFN subframes | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111818 | Remaining issues on UE category | NTT DOCOMO | Noted |
R1‑111819 | Further Phase-1 Evaluations of Joint Transmission and DCS Schemes | Motorola Mobility | Not treated |
R1‑111820 | Draft Reply LS on CSI reporting and SCell deactivation | Huawei, CATT, Samsung, CMCC | Not treated |
R1‑111821 | Ambiguity of DCI format 4 and 2/2A/2B/2C detection | Huawei, HiSilicon | Not treated |
R1‑111822 | Draft CR 36.212 Ambiguity of DCI format 4 and 2/2A/2B/2C detection | Huawei, HiSilicon | Not treated |
R1‑111823 | Uplink power control for simultaneous transmission with SRS | Pantech | Not treated |
R1‑111824 | Reply LS on PDSCH transmission in MBSFN subframes | RAN1, CATT | Agreed |
R1‑111825 | 36.211 CR0158 (Rel-10, F) PDSCH transmission in MBSFN subframes | CATT, Panasonic | Agreed |
R1‑111826 | LS to RAN (cc RAN3, RAN4) on coordination between ITU-T and 3GPP on synchronization | RAN1, Alcatel-Lucent | Agreed |
R1‑111827 | LS on HSDPA Multipoint Transmission | RAN1, Nokia Siemens Networks | Agreed |
R1‑111828 | 36.211 CR0153R2 (Rel-10, Cat F) PUSCH interaction with periodic SRS | Ericsson, ST-Ericsson, Huawei, HiSi, Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑111829 | 36.212 CR0113 (Rel-10, F) Clarification on PMI indication in DCI format1B and format 2 | Huawei, HiSilicon, Motorola Mobility, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Panasonic, Ericsson, ST-Ericsson, Qualcomm Incorporated | Agreed |
R1‑111830 | 36.213 CR0294 (Rel-10, F) ACK/NACK and CQI simultaneous transmission in ACK/NACK bundling in TDD | Panasonic | Agreed |
R1‑111831 | 36.213 CR0295 (Rel-10, F) on UE specific disabling of UL DMRS sequence hopping | Panasonic, Huawei, HiSilicon, LG Electronics, Ericsson, ST-Ericsson, Sharp, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Motorola Mobility | Agreed |
R1‑111832 | Draft 36.212 CR on TDD ACK/NAK transmission on PUSCH for carrier aggregation | CATT | Noted |
R1‑111833 | Draft 36.213 CR on TDD ACK/NAK transmission on PUSCH for carrier aggregation | CATT | Noted |
R1‑111834 | 36.213 CR0296 (Rel-10, F) PDSCH transmission in MBSFN subframes | CATT, Panasonic | Agreed |
R1‑111835 | 36.213 CR0282R1 (Rel-10, Cat F) Correction to timing for secondary cell activation and deactivation | Ericsson, ST-Ericsson, InterDigital, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Fujitsu | Noted - Revised |
R1‑111836 | Minutes from RAN1#65 HSPA sessions | HSPA session chairman | Endorsed |
R1‑111837 | Draft LS on HS-SCCH orders for DC-HSDPA (To: RAN2, Cc: RAN3) | Ericsson | Noted - Revised |
R1‑111838 | 25.214 CR0651 (Rel-9, F) Clarification of Secondary_Cell_Active when Secondary_Cell_Enabled is changed from 0 to 1 | Ericsson, ST-Ericsson | Agreed |
R1‑111839 | 25.214 CR0653 (Rel-10, A) Clarification of activation status when Secondary_Cell_Enabled is changed from 0 to a value not equal to 0 | Ericsson, ST-Ericsson | Agreed |
R1‑111840 | Draft LS on HS-SCCH orders for DC-HSUPA (To: RAN2, Cc: RAN3) | Ericsson | Noted - Revised |
R1‑111841 | 25.225 CR0101R1 (Rel-10, F) Introduction of Cell Portion in AOA measurement for LCR TDD | TD Tech, ZTE, CATT | Noted - Revised |
R1‑111842 | LS on HS-SCCH orders for DC-HSDPA (To: RAN2, Cc: RAN3) | RAN1, Ericsson | Agreed |
R1‑111843 | Draft TR on HSDPA Multipoint Transmission | Nokia Siemens Networks | Noted - Revised |
R1‑111844 | Evaluation of SFDC-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑111845 | TP on Impact to RAN Specifications due to HSDPA MP-Tx | Qualcomm Incorporated | Noted |
R1‑111846 | TP on performance of HSDPA Multipoint Transmission | Nokia Siemens Networks | Withdrawn |
R1‑111847 | TP on performance of HSDPA Multipoint Transmission | Qualcomm Incorporated | Noted - Revised |
R1‑111848 | 25.225 CR0101R2 (Rel-10, F) Introduction of Cell Portion in AOA measurement for LCR TDD | TD Tech, ZTE, CATT | Agreed |
R1‑111849 | Draft LS on 8C-HSDPA agreements (To: RAN2, RAN3, RAN4) | Ericsson | Noted - Revised |
R1‑111850 | Draft TR on UL MIMO for HSPA | Qualcomm Incorporated | Endorsed |
R1‑111851 | Draft LS on UL MIMO for HSPA (To: RAN2) | Qualcomm Incorporated | Noted - Revised |
R1‑111852 | TR25.871 v1.0.0 on UL MIMO for HSPA | Qualcomm Incorporated | Noted - Revised |
R1‑111853 | Reply to LS on CSI reporting and SCell deactivation | RAN1, Fujitsu | Agreed |
R1‑111854 | 36.213 CR0304R1 (Rel-10, F) Corrections on CQI type in PUCCH mode 2-1 and clarification on simultaneous PUCCH and PUSCH transmission for UL-SCH subframe bundling | Potevio | Agreed |
R1‑111855 | 36.212 CR0115R1 (Rel-10, D) Editorial change on the definition of Bc^DL | CATT | Noted - Revised |
R1‑111856 | 36.213 CR0278R3 (Rel-10, Cat F) Corrections to power headroom | RIM, Ericsson, ST-Ericsson, CATT | Agreed |
R1‑111857 | 36.213 CR0314R1 (Rel-10, F) on antenna selection | CATT, CATR, CMCC, CHTTL, ITRI, MediaTek, New Postcom, Potevio, ZTE, HTC, Qualcomm, Ericsson, ST-Ericsson | Agreed |
R1‑111858 | 36.213 CR0274R3 (Rel-10, F) Correction to HARQ-ACK procedure for TDD mode b with M=2 | Huawei, HiSilicon, ZTE, CATT | Agreed |
R1‑111859 | 36.212 CR0107R2 (Rel-10, F) Corrections on HARQ-ACK Channel Coding in the PUSCH | Samsung | Agreed |
R1‑111860 | 36.212 CR0112R1 (Rel-10, F) Correction on bit representations of transport block processing for UL-SCH | ZTE | Agreed |
R1‑111861 | 36.211 CR0155R2 (Rel-10, F) Correction on codebooks for CSI-RS based feedback for up to 4 CSI-RS ports. | Samsung | Noted - Revised |
R1‑111862 | 36.213 CR0320 (Rel-10, F) Multiple Aperiodic SRS Triggers for Same Configuration | Samsung | Agreed |
R1‑111863 | 36.212 CR0114R1 (Rel-10, F) Rate matching parameters for CA | NTT DOCOMO, Panasonic, Samsung, Huawei, CATT, Renesas Mobile Europe Ltd, Nokia, Nokia Siemens Networks, Motorola Mobility, I2R, Ericsson, ST-Ericsson | Agreed |
R1‑111864 | Reply LS on Rel-10 UE category | RAN1, NTT DoCoMo | Agreed |
R1‑111865 | TR25.871 v1.0.1 on UL MIMO for HSPA | Qualcomm Incorporated | Agreed |
R1‑111866 | TP on performance of HSDPA Multipoint Transmission | Qualcomm Incorporated | Agreed |
R1‑111867 | TR25.872 v1.0.0 on HSDPA Multipoint Transmission | Nokia Siemens Networks | Agreed |
R1‑111868 | 36.213 CR0310R1 (Rel-10, F) Miscellaneous corrections for TS36.213 | CATT | Agreed |
R1‑111869 | 36.213 CR0312R1 (Rel-10, F) on correction on the support of PUCCH format 3 and channel selection | CATT | Agreed |
R1‑111870 | 36.212 CR0103R3 (Rel-10, Cat F) Correction of DCI format 0 and 4 resource allocation | Panasonic, Texas Instruments, LG Electronics, Ericsson, ST-Ericsson, Qualcomm, Samsung, ZTE | Agreed |
R1‑111871 | 36.213 CR0291R3 (Rel-10, Cat F) Correction of uplink resource allocation type 1 | Panasonic, Texas Instruments, LG Electronics, Ericsson, ST-Ericsson, Qualcomm, Samsung, ZTE | Agreed |
R1‑111872 | 36.213 CR0275R2 (Rel-10, B) Determination of PUSCH A/N codebook size for TDD | Huawei, HiSilicon, LGE, Qualcomm | Noted - Revised |
R1‑111873 | 36.213 CR0302R1 (Rel-10, F) Correction on Simultaneous PUCCH and SRS Transmissions on CA | LG Electronics, Texas Instruments, CATT, Qualcomm, Panasonic | Agreed |
R1‑111874 | 36.213 CR0301R1 (Rel-10, F) Correction to simultaneous transmission of SRS and PUCCH format 2/2a/2b | ZTE, Qualcomm Inc. | Agreed |
R1‑111875 | Final report of RAN1#64 meeting | MCC Support | Agreed |
R1‑111876 | 36.306 Draft CR on Clarification of "supportedMIMO-CapabilityDL" | Panasonic | Noted - Revised |
R1‑111877 | WF on power control of PUCCH in LTE-A TDD | ZTE, CATT, CMCC | Noted |
R1‑111878 | UE Soft Buffer Requirements | Qualcomm Incorporated | Not treated |
R1‑111879 | Way forward on Antenna switching in conjunction with CA | CATT, CATR, CMCC, CHTTL, ITRI, MediaTek, New Postcom, Potevio, ZTE, HTC, Qualcomm, Ericsson, ST-Ericsson | Agreed |
R1‑111880 | Further update of CoMP Phase 1 evaluation results for JT with non full buffer traffic model | Panasonic | Not treated |
R1‑111881 | 36.213 CR0274R1 (Rel-10, F) Correction to HARQ-ACK procedure for TDD mode b with M=2 | Huawei, HiSilicon, CMCC, Potevio, MediaTek, NewPostcom | Noted - Revised |
R1‑111882 | Remaining details on HARQ-ACK procedure with PUCCH format 3 for TDD | Huawei, HiSilicon, NewPostCom | Noted |
R1‑111883 | 36.213 CR0297 (Rel-10, F) Introduction of PCMAX for PUSCH power scaling | InterDigital, Ericsson, ST-Ericsson, LG Electronics | Agreed |
R1‑111884 | 36.213 CR0278R1 (Rel-10, Cat F) Corrections to power headroom | Ericsson, ST-Ericsson, RIM | Revised |
R1‑111885 | 36.213 CR0298 (Rel-10, F) Power control for SR and ACK/NACK with PUCCH format 3 | LG Electronics, Samsung, Qualcomm, Ericsson, ST-Ericsson | Agreed |
R1‑111886 | 36.213 CR0299 (Rel-10, F) CR on power control for HARQ-ACK transmission on PUCCH | ZTE, CATT, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑111887 | 36.212 CR0108R2 (Rel-10, F) A clarification for DCI format payload size | ZTE, Fujitsu, Ericsson, ST-Ericsson, Texas Instruments, Qualcomm Incorporated, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, Nokia, NSN, Potevio, Renesas, Huawei, HiSilicon, Samsung | Noted - Revised |
R1‑111888 | 36.212 CR0103R1 (Rel-10, Cat F) Correction of DCI format 0 and 4 resource allocation | Panasonic, Texas Instruments, LG Electronics, Ericsson, ST-Ericsson | Revised |
R1‑111889 | 36.213 CR0291R1 (Rel-10, Cat F) Correction of uplink resource allocation type 1 | Panasonic, Texas Instruments, LG Electronics, Ericsson, ST-Ericsson | Revised |
R1‑111890 | 36.213 CR0300 (Rel-10, F) Correction to handling of search space overlap | LG Electronics | Agreed |
R1‑111891 | WF on special case handling for PUCCH format 3 in TDD for one configured serving cell | ZTE, Huawei, HiSilicon, Pantech, CATT, CMCC | Not treated |
R1‑111892 | 36.213 CR0308 (Rel-10, B) Simultaneous SRS transmissions in more than one cell | Samsung, CATT, Qualcomm, Ericsson, ST-Ericsson, Texas Instruments, LG Electronics, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Pantech | Agreed |
R1‑111893 | 36.213 CR0301 (Rel-10, F) Correction to simultaneous transmission of SRS and PUCCH format 2/2a/2b | ZTE, Qualcomm Inc. | Noted - Revised |
R1‑111894 | 36.213 CR0302 (Rel-10, F) Correction on Simultaneous PUCCH and SRS Transmissions on CA | LG Electronics | Noted - Revised |
R1‑111895 | 36.213 CR0290R1 (Rel-10, Cat F) Joint transmission of ACK/NACK and SR with PUCCH format 3 | Ericsson, ST-Ericsson | Noted - Revised |
R1‑111896 | Draft CR for TS36.212 5.2.2 | ZTE | Noted - Revised |
R1‑111897 | LS on FGI bit for UL-MIMO UE relative phase continuity | RAN4, Huawei | Noted |
R1‑111898 | 36.213 CR0288R1 (Rel-10, F) Corrections on UE procedure for determining PUCCH Assignment | Samsung, LG Electronics | Agreed |
R1‑111899 | Discussion on UE category signalling | NTT DOCOMO | Noted |
R1‑111900 | 36.213 CR0303 (Rel-10, F) Correction on 8Tx Codebook Sub-sampling for PUCCH Mode 1-1 | LG Electronics | Agreed |
R1‑111901 | 36.211 CR0155R1 (Rel-10, F) Correction on codebooks for CSI-RS based feedback for up to 4 CSI-RS ports. | Samsung | Noted - Revised |
R1‑111902 | 36.213 CR0304 (Rel-10, F) Corrections on UE procedure for reporting CSI and HARQ-ACK | Potevio | Noted - Revised |
R1‑111903 | 36.213 CR0305 (Rel-10, F) Correction on UE behaviour upon reporting periodic CSI using PUCCH Mode1-1 | ITRI | Noted - Revised |
R1‑111904 | 36.213 CR0306 (Rel-10, F) Clarification for the definition of CQI | ITRI | Agreed |
R1‑111905 | 36.213 CR0307 (Rel-10, F) Clarification for the definition of precoding matrix indicator | ITRI | Agreed |
R1‑111906 | Way forward on A-SRS triggering bit | CATT, Motorola Mobility, Panasonic, Qualcomm, ZTE | Noted |
R1‑111907 | Preliminary CoMP evaluation results for Scenarios 3 and 4 | Qualcomm Incorporated | Noted |
R1‑111908 | 36.213 CR0275R1 (Rel-10, B) Determination of PUSCH A/N codebook size for TDD | Huawei, HiSilicon | Noted - Revised |
R1‑111909 | 36.211 CR0154R1 (Rel-10, F) Correction on describing PUCCH format 3 | Samsung | Agreed |
R1‑111910 | 36.213 CR0281R1 (Rel-10, Cat F) Correction of AN repetition and PUCCH format 3 | Ericsson, ST-Ericsson, CATT | Agreed |
R1‑111911 | 36.216 Draft CR for Correction on the Relay Nodes Behaviour for CSI report and SRS transmission | LG Electronics, NSN, Nokia | Noted |
R1‑111912 | Draft CR on single codeword multiple layer transmission in Uplink | Panasonic | Noted - Revised |
R1‑111913 | Draft 36.216 CR Clarification on Un subframe configuration | Nokia Siemens Networks, Nokia, LGE | Noted - Revised |
R1‑111914 | Draft 36.216 CR Clarification on UL TDD ACK/NACK transmission | Nokia Siemens Networks, Nokia | Not treated |
R1‑111915 | Considerations for CoMP Operation | HTC | Not treated |
R1‑111916 | 36.212 CR0103R2 (Rel-10, Cat F) Correction of DCI format 0 and 4 resource allocation | Panasonic, Texas Instruments, LG Electronics, Ericsson, ST-Ericsson, Qualcomm | Noted - Revised |
R1‑111917 | 36.213 CR0291R2 (Rel-10, Cat F) Correction of uplink resource allocation type 1 | Panasonic, Texas Instruments, LG Electronics, Ericsson, ST-Ericsson, Qualcomm | Noted - Revised |
R1‑111918 | Draft LS on updated parameters for Rel-10 | Ericsson | Noted - Revised |
R1‑111919 | 36.212 CR0111 (Rel-10, F) Resource dimensioning for CQI only PUSCH transmission | Motorola Mobility | Agreed |
R1‑111920 | 36.212 CR0107R1 (Rel-10, F) Corrections on HARQ-ACK Channel Coding in the PUSCH | Samsung | Noted - Revised |
R1‑111921 | 36.212 CR0112 (Rel-10, F) Correction on bit representations of transport block processing for UL-SCH | ZTE | Noted - Revised |
R1‑111922 | RAN1 Phase 1 CoMP results | Samsung | Noted - Revised |
R1‑111923 | TR36.819v0.0.2: Inclusion of CoMP Phase 1 evaluation results | Samsung | Noted - Revised |
R1‑111924 | 36.211 CR0159 (Rel-10, F) Correction on implicit derivation of transmission comb per antenna port for SRS | LG Electronics, Panasonic, Ericsson, ST-Ericsson, CATT, Huawei, HiSilicon, Sharp | Agreed |
R1‑111925 | On Un PDSCH Mapping | LG Electronics | Noted |
R1‑111926 | 36.216 Draft CR for Clarification on UE-specific RS related behaviour in eNB-to-RN transmissions | LG Electronics | Not treated |
R1‑111927 | 36.216 CR0004R1 (Rel-10, F) on muted CSI-RS for REG | ZTE | Noted - Revised |
R1‑111928 | Way Forward on Clarification on Phase 2 CoMP Evaluations | LG Electronics, ZTE, Samsung, Intel, Ericsson, ST-Ericsson, Motorola Mobility | Not treated |
R1‑111929 | 36.213 CR0283R1 (Rel-10, Cat F) Correction on MCS offsets for multiple TBs | Ericsson, ST-Ericsson | Agreed |
R1‑111930 | 36.216 CR0008 (Rel-10, F) Correction to DM-RS transmission and assumption | Panasonic, Ericsson, ST-Ericsson, Texas Instruments, Huawei, HiSilicon, Motorola Mobility, ZTE | Agreed |
R1‑111931 | 36.213 CR0292R1 (Rel-10, Cat F) Correction on CSI-RS configuration | Huawei, HiSilicon, Nokia, Nokia Siemens Networks, Renesas Mobile Europe Ltd, Texas Instruments, Research in Motion, Motorola Mobility, Samsung, LG Electronics, CATT, ZTE | Agreed |
R1‑111932 | Observations on CoMP Phase 1 evaluations | Samsung | Noted |
R1‑111933 | 36.216 CR0007R1 (Rel-10, F) Clarifications on R-PDCCH cross interleaving and antenna port selection | Huawei, HiSilicon, Panasonic, Texas Instruments, InterDigital, CATT, Ericsson, Qualcomm | Agreed |
R1‑111934 | Way forward of performance calibration for scenario 3 / 4 | NTT DOCOMO, CATT, CMCC, Huawei, HiSillicon, Intel, LG electronics, Motorola Mobility, NEC, Panasonic, Samsung | Noted |
R1‑111935 | CoMP Evaluation for Phase2 | NTT DOCOMO | Noted |
R1‑111936 | 36.211 CR0160 (Rel-10, F) Uplink DMRS sequence in RACH procedure | Panasonic | Agreed |
R1‑111937 | Way forward on extension of channel modeling for Phase 2 evaluations | Ericsson, LG Electronics, Orange, ST-Ericsson | Noted |
R1‑111938 | [DRAFT] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | Huawei | Noted - Revised |
R1‑111939 | Draft CR on single codeword multiple layer transmission in uplink | Panasonic, CATT, Ericsson, Huawei, HiSilicon, LG Electronics, Motorola Mobility, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Renesas Mobile Europe, Research In Motion, Samsung, ST-Ericsson | Noted - Revised |
R1‑111940 | Way Forward on CSI reporting for CA | Fujitsu | Noted |
R1‑111941 | Miscelaneous corrections to 36.213 | NEC Group | Not treated |
R1‑111942 | Downlink CSI feedback accuracy enhancement for MU-MIMO | KDDI | Not treated |
R1‑111943 | Impact of antenna calibration | ZTE | Noted |
R1‑111944 | RAN1 Phase 1 CoMP results | Samsung | Not treated |
R1‑111945 | TR36.819v0.0.2: Inclusion of CoMP Phase 1 evaluation results | Samsung | Noted - Revised |
R1‑111946 | 36.213 CR0309 (Rel-10, F) on TDD ACK/NACK transmission on PUSCH for CA | CATT | Noted |
R1‑111947 | 36.213 CR0310 (Rel-10, F) Miscellaneous corrections for TS36.213 | CATT | Noted - Revised |
R1‑111948 | 36.213 CR0311 (Rel-10, F) on configuration of PMI-RI-Report | CATT | Noted - Revised |
R1‑111949 | 36.213 CR0312 (Rel-10, F) on correction on the support of PUCCH format 3 and channel selection | CATT | Noted - Revised |
R1‑111950 | Skeleton TR for Downlink MIMO Enhancement Study Item | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Endorsed |
R1‑111951 | Uplink MIMO link level evaluation, methodology D | Nokia Siemens Networks, Nokia | Noted |
R1‑111952 | Draft LS reply on UL mobility load balancing utilizing UL TPC commands | Huawei | Noted - Revised |
R1‑111953 | 36.216 CR0009 (Rel-10, F) Clarification on Un subframe configuration | Nokia Siemens Networks, Nokia, LGE | Agreed |
R1‑111954 | 36.213 CR0313 (Rel-10, F) Correction on UE behaviour during DM-RS transmission on subframes carrying synchronisation signals | Texas Instruments, Renesas Mobile Europe Ltd., Qualcomm, Nokia, Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Samsung, Huawei, HiSilicon | Agreed |
R1‑111955 | WF on PDSCH starting position with CIF | ZTE, CATT, Qualcomm, CMCC, Potevio, CATR | Not treated |
R1‑111956 | WF from Ad-hoc session on HARQ-ACK transmission for TDD | Samsung, CATT, Ericsson, LG Electronics, Nokia, NSN, Panasonic, Qualcomm, ST-Ericsson, Texas Instruments | Agreed |
R1‑111957 | 36.212 CR0104R2 (Rel-10, Cat F) Correction to Multi-cluster flag in DCI format 0 | Ericsson, ST-Ericsson, Panasonic, Motorola Mobility, Samsung | Agreed |
R1‑111958 | 36.213 CR0289R2 (Rel-10, Cat F) Correction to Multi-cluster flag in DCI format 0 | Ericsson, ST-Ericsson, Panasonic, Motorola Mobility, Samsung | Agreed |
R1‑111959 | WF on ACK/NACK codebook size determination in CA | CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR, CMCC, Potevio, Qualcomm Inc, Renesas Electronics Europe, Texas Instruments, ZTE | Noted |
R1‑111960 | 36.213 CR0278R2 (Rel-10, Cat F) Corrections to power headroom | Ericsson, ST-Ericsson, RIM | Noted - Revised |
R1‑111961 | 36.213 CR0282R2 (Rel-10, Cat F) Correction to timing for secondary cell activation and deactivation | Ericsson, ST-Ericsson, InterDigital, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Fujitsu | Agreed |
R1‑111962 | 36.216 CR0010 (Rel-10, F) Correction to physical downlink shared channel mapping | Panasonic, Samsung, LG Electronics, Texas Instruments, ZTE, Qualcomm, NEC, Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑111963 | 36.213 CR0314 (Rel-10, F) on antenna selection | CATT, CATR, CMCC, CHTTL, ITRI, MediaTek, New Postcom, Potevio, ZTE, HTC, Qualcomm, Ericsson, ST-Ericsson | Noted - Revised |
R1‑111964 | [Draft] Reply to LS on CSI reporting and SCell deactivation | Fujitsu | Noted - Revised |
R1‑111965 | 36.306 Draft CR on Clarification of "supportedMIMO-CapabilityDL" | Panasonic, Renesas Mobile Europe Ltd, Samsung, Qualcomm, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Network, NTT DOCOMO, Motorola Mobility | Endorsed |
R1‑111966 | 36.212 CR0108R3 (Rel-10, F) A clarification for DCI format payload size | ZTE, Fujitsu, Ericsson, ST-Ericsson, Texas Instruments, Qualcomm Incorporated, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, Nokia, NSN, Potevio, Renesas, Huawei, HiSilicon, Samsung, LG Electronic | Agreed |
R1‑111967 | 36.212 CR0114 (Rel-10, F) Rate matching parameters for CA | NTT DOCOMO, Panasonic, Samsung, Huawei, CATT, Renesas Mobile Europe Ltd, Nokia, Nokia Siemens Networks, Motorola Mobility | Noted - Revised |
R1‑111968 | 36.213 CR0315 (Rel-10, F) UE behaviour for PDSCH reception with limited soft buffer in CA | NTT DoCoMo | Withdrawn |
R1‑111969 | Draft Reply LS on Rel-10 UE category | NTT DoCoMo | Noted - Revised |
R1‑111970 | Final report of RAN1#64 meeting | MCC Support | Noted - Revised |
R1‑111971 | Minutes from RAN1#65 UL MIMO session | Ad Hoc Chairman (Samsung) | Endorsed |
R1‑111972 | Minutes from RAN1#65 DL RS session | Ad Hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑111973 | Minutes from RAN1#65 CoMP session | Ad Hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑111974 | 36.213 CR0316 (Rel-10, F) Number of HARQ process for UL spatial multiplexing | ASUSTeK | Noted - Revised |
R1‑111975 | WF on A/N transmission for PUCCH format 3 in TDD | Huawei, Hisilicon, ZTE, CMCC, Potevio, CATR | Not treated |
R1‑111976 | Summary of Ad-Hoc Session on HARQ-ACK Transmission for TDD | Ad Hoc Chairman (Samsung) | Endorsed |
R1‑111977 | TR36.819 v0.0.2: Inclusion of CoMP Phase 1 evaluation results | Samsung | Noted - Revised |
R1‑111978 | 36.213 CR0317 (Rel-10, F) PUCCH format 3 Fallback procedure in TDD | Samsung, LG Electronics, CATT | Agreed |
R1‑111979 | 36.213 CR0274R2 (Rel-10, F) Correction to HARQ-ACK procedure for TDD | Huawei, HiSilicon, ZTE | Noted - Revised |
R1‑111980 | Way forward on aperiodic SRS trigger bit configuration | Huawei, HiSilicon, Panasonic, LG Electronics, Sharp, Texas Instruments, Ericsson, ST-Ericsson, Samsung | Agreed |
R1‑111981 | 36.213 CR0318 (Rel-10, F) Clarification on CSI reporting under an invalid downlink subframe | Qualcomm Incorporated, TI, Ericsson, ST-Ericsson, Panasonic, Nokia, NSN | Agreed |
R1‑111982 | TR36.871 v0.1.0 on Downlink MIMO Enhancement for LTE-Advanced | - | Not treated |
R1‑111983 | Reciprocity modelling for TDD CoMP evaluation | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted - Revised |
R1‑111984 | 36.213 CR0311R1 (Rel-10, F) on configuration of PMI-RI-Report | CATT | Agreed |
R1‑111985 | Summary on TDD HARQ-ACK on PUSCH | Huawei, HiSilicon | Noted |
R1‑111986 | 36.213 CR0286R1 (Rel-10, F) Miscellaneous Corrections | Samsung | Agreed |
R1‑111987 | 36.213 CR0290R2 (Rel-10, Cat F) Joint transmission of ACK/NACK and SR with PUCCH format 3 | Ericsson, ST-Ericsson, LG Electronics, Samsung, CATT | Agreed |
R1‑111988 | 36.213 CR0319 (Rel-10, F) Correction on the support of TM8 in extended CP | CATT | Noted |
R1‑111989 | 36.216 CR0004R2 (Rel-10, F) Capturing of agreement on reserving muted CSI-RS for REG in cross-interleaved R-PDCCH | ZTE, Qualcomm Inc., Huawei, HiSilicon, LG Electronics, Ericsson, ST-Ericsson, Texas Instruments | Agreed |
R1‑111990 | Draft CR on Multiple Aperiodic SRS Triggers for Same Configuration | Samsung | Noted - Revised |
R1‑111991 | LS reply on UL mobility load balancing utilizing UL TPC commands | RAN1, Huawei | Agreed |
R1‑111992 | LS on HS-SCCH orders for DC-HSUPA (To: RAN2, Cc: RAN3) | RAN1, Ericsson | Agreed |
R1‑111993 | LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | RAN1, Huawei | Agreed |
R1‑111994 | 36.213 CR0299R1 (Rel-10, F) CR on power control for HARQ-ACK transmission on PUCCH | ZTE,CATT,Samsung,Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑111995 | LS on 8C-HSDPA agreements | RAN1, Ericsson | Agreed |
R1‑111996 | LS on UL MIMO for HSPA | RAN1, Qualcomm Incorporated | Agreed |
R1‑111997 | 36.212 CR0115 (Rel-10, F) Correction on the definition of Bc^DL | CATT | Noted - Revised |
R1‑111998 | 36.213 CR0316R1 (Rel-10, F) Number of HARQ process for UL spatial multiplexing | ASUSTeK | Agreed |
R1‑111999 | TR 36.819 v0.1.0 on Coordinated Multi-Point Operation for LTE: Physical Layer Aspects | Samsung | Agreed |
R1‑112000 | 36.213 CR0279R1 (Rel-10, Cat F) Removal of square brackets for PUCCH format 3 ACK/NACK | Ericsson, ST-Ericsson, LGE, Huawei, HiSilicon | Agreed |
R1‑112001 | Resolution of Open Issues in Editor's Notes in TS36.213 | Samsung | Withdrawn |
R1‑112002 | LS on updated parameters for Rel-10 | RAN1, Ericsson | Agreed |
R1‑112003 | 36.216 CR0011 (Rel-10, F) Correction on HARQ-ACK procedure | CATT | Agreed |
R1‑112004 | 36.213 CR0321 (Rel-10, F) UE antenna switch in UL MIMO | Qualcomm Incorporated, CATT | Agreed |
R1‑112005 | 36.211 CR0155R3 (Rel-10, F) Correction on codebooks for CSI-RS based feedback for up to 4 CSI-RS ports. | Samsung | Agreed |
R1‑112006 | 36.213 CR0305R1 (Rel-10, F) Correction on UE behaviour upon reporting periodic CSI using PUCCH Mode1-1 | ITRI, CATT, LG Electronics, Huawei, HiSilicon, Texas Instruments | Agreed |
R1‑112007 | 36.216 CR0010R1 (Rel-10, F) Correction to physical downlink shared channel mapping | Panasonic, Samsung, LG Electronics, Texas Instruments, ZTE, Qualcomm, NEC, Nokia Siemens Networks, Nokia | Agreed |
R1‑112008 | 36.212 CR0115R2 (Rel-10, D) Correction on the definition of Bc^DL | CATT | Withdrawn |
R1‑112009 | 36.213 CR0299R2 (Rel-10, F) CR on power control for HARQ-ACK transmission on PUCCH | ZTE, CATT, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon | Agreed |
R1‑112010 | 36.213 CR0275R3 (Rel-10, B) Determination of PUSCH A/N codebook size for TDD | Huawei, HiSilicon, Samsung | Agreed |
R1‑112011 | 36.212 CR0116 (Rel-10, B) HARQ-ACK on PUSCH for TDD with channel selection configured for 2 serving cells | Huawei, HiSilicon, Samsung | Agreed |
R1‑112012 | 36.213 CR0322 (Rel-10, F) UE behaviour for PDSCH reception with limited soft buffer in CA | NTT DoCoMo | Agreed |
R1‑112013 | 36.212 CR0117 (Rel-10, F) Single codeword multiple layer transmission in uplink | Panasonic, CATT, Ericsson, Huawei, HiSilicon, LG Electronics, Motorola Mobility, NEC Group, Nokia, Nokia Siemens Networks, NTT DOCOMO, Qualcomm Incorporated , Renesas Mobile Europe, Research In Motion, Samsung, Sharp, ST-Ericsson, Texas Instruments | Agreed |
R1‑112014 | 36.213 CR0323 (Rel-10, F) Joint transmission of ACK/NACK and SR or CSI with PUCCH format 3 and channel selection | Ericsson, ST-Ericsson | Agreed |
R1‑112015 | LS on soft buffer portioning and rate matching for Rel-10 carrier aggregation | RAN1, NTT DoCoMo | Agreed |
R1‑112016 | Reciprocity modelling for the evaluation of TDD CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Agreed |
R1‑112017 | Performance calibration results for Scenarios 3 and 4 | NTT DoCoMo | Noted |
page generated from database: 2024-07-20 12:15:34