3GPP TDocs (written contributions) at meeting
Meeting: GP-17 - 2003-11-17 to 2003-11-21, Budapest
meeting id: GP-17 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑032295 | - | - | - |
GP‑032296 | - | - | - |
GP‑032297 | - | - | - |
GP‑032298 | - | - | - |
GP‑032299 | CR 51.010-1 Faulty RLC data block sending time in 42.5.4.1 (Rel-5) | COMNEON GmbH & Co OHG | - |
GP‑032300 | CR 51.010-1 Inconsistency in TC 42.1.2.1.3.1 (Rel-5) | COMNEON GmbH & Co OHG | - |
GP‑032301 | CR 51.010-1 Inconsistency in TC 52.1.2.1.3.1 (Rel-5) | COMNEON GmbH & Co OHG | - |
GP‑032302 | Alignment of Test Specification with Core Specification in section 20.22.29 | Vodafone Group | - |
GP‑032303 | - | - | - |
GP‑032304 | - | - | - |
GP‑032305 | Max_samples for case 3 and 4 in the Table 21.8 (Section 21) have been corrected. | Nokia | - |
GP‑032306 | Adding TTY test cases to 51.010-1 section 80 | 7 layers AG | - |
GP‑032307 | Adding TTY test cases | 7 layers AG | - |
GP‑032308 | Changes to final steps of 46.2.2.1.1 | WAVECOM | - |
GP‑032309 | - | - | - |
GP‑032310 | Correction to TC 14.2.10 | Ericsson | - |
GP‑032311 | Correction to TC's 26.16.1, 26.16.9.11 and 26.16.9.12 | Ericsson | - |
GP‑032312 | Location updating/periodic search for higher priority PLMN when the list of equivalent PLMNs includes the HPLMN, when a MS is registered in a foreign country’s VPLMN/MS is in automatic mode | Motorola | - |
GP‑032313 | 51.010-1 TC 44.2.3.3.2 Periodic routing area updating / accepted / T3312 default value | Siemens | - |
GP‑032314 | 51.010-1 TC 44.2.3.3.1 Periodic routing area updating / accepted | Siemens | - |
GP‑032315 | Introduction of mobile station multislot power classes | Nokia | - |
GP‑032316 | 20.22.21 – Changing the default condition of the cell 1, from NC2 to NC0. | SASKEN | - |
GP‑032317 | 40.4.3.8 – Addition of a delay of 3 blocks after the sending of the PACKET UPLINK ACK/NACK. | SASKEN | - |
GP‑032318 | 41.2.3.10 – Increasing the number of octets from 440 to 2000 for the data transfer triggered in step 0. | SASKEN | - |
GP‑032319 | 41.2.3.8 – Changing the PICS used in the step A10. | SASKEN | - |
GP‑032320 | 42.1.2.1.14 – Correcting the contents of SYSTEM INFORMATION TYPE 13. | SASKEN | - |
GP‑032321 | 42.1.2.1.15, 42.1.2.1.16, 42.1.2.1.17,42.1.2.1.18 – Using SI13 rather than PSI13. | SASKEN | - |
GP‑032322 | 42.1.2.1.8.1.6– Addition of a delay of 6 blocks in step 9. | SASKEN | - |
GP‑032323 | 42.1.2.2 – Changing the Channel on which the PACKET DOWNLINK ASSIGNMENT is sent from PCCCH to PPCH. | SASKEN | - |
GP‑032324 | 42.4.2.1.1 – Updates in step 3. | SASKEN | - |
GP‑032325 | 42.4.2.3.1 – Allowing the reception of PACKET MEASUREMENT REPORTs in Cell C. | SASKEN | - |
GP‑032326 | 42.4.2.3.4 – Changing the default condition of the cell 1 and 2, from PBCCH present to PBCCH not present. | SASKEN | - |
GP‑032327 | 42.4.2.3.5– Modification in step 25. | SASKEN | - |
GP‑032328 | Modifications in testcases 42.4.2.3.3, 42.4.2.3.5, 42.4.2.3.6 | SASKEN | - |
GP‑032329 | Modifications in the step 10 of the testcase 42.8.3. | SASKEN | - |
GP‑032330 | Modifications in the testcase 43.1.2.4 for the Mobiles stations negotiating for the window size less than 2. | SASKEN | - |
GP‑032331 | 43.3.2 – Changing the channel on which the IMMEDIATE ASSIGNMENT for the downlink TBF is sent, from AGCH to PCH. | SASKEN | - |
GP‑032332 | Modification to the test purpose of the testcase 46.1.2.2.1.1. | SASKEN | - |
GP‑032333 | Editorial modification to the test procedure of the testcases 46.1.2.2.4.3, 46.1.2.7.7 | SASKEN | - |
GP‑032334 | 51.010-2: Addition of new NC2 cases | SASKEN | - |
GP‑032335 | 52.1.2.1.8.1.6– Addition of a delay of 6 blocks in step 9. | SASKEN | - |
GP‑032336 | 52.1.2.2 – Changing the Channel on which the PACKET DOWNLINK ASSIGNMENT is sent, from PCCCH to PPCH. | SASKEN | - |
GP‑032337 | 53.3.2 – Changing the channel on which the IMMEDIATE ASSIGNMENT for the downlink TBF is sent from AGCH to PCH. | SASKEN | - |
GP‑032338 | Addition of new NC2 testcases to 42.4.1 | SASKEN | - |
GP‑032339 | Addition of new NC2 testcases to 42.4.4 | SASKEN | - |
GP‑032340 | Addition of new NC2 testcases to 20.22 | SASKEN | - |
GP‑032341 | 42.1.2.1.1.1Packet Uplink Assignment / Packet queuing notification / Stop sending Packet Channel Requests | Setcom | - |
GP‑032342 | 52.1.2.1.1.1 Packet Uplink Assignment / Packet queuing notification / Stop sending Packet Channel Requests | Setcom | - |
GP‑032343 | 51.2.2.4 Initiation of the packet access procedure / timer T3146 | Setcom | - |
GP‑032345 | CR 51.010-1 42.4.2.1.4 Cell change order procedure / Uplink transfer / Failure cases / Contention resolution failure | Setcom | - |
GP‑032346 | CR 51.010-1 42.4.2.3.1 Cell change order procedure / Simultaneous uplink and downlink transfer / Normal case | setcom | - |
GP‑032347 | CR 51.010-1 42.4.2.3.7 MT CS establishment whilst in NC2 with a uplink TBF established | Setcom | - |
GP‑032348 | CR 51.010-1 42.4.6.4Network Control PEMR – Uplink Data Transfer | Setcom | - |
GP‑032349 | CR 51.010-1 46.2.2.1.2 Mobile originated normal data transfer with LLC in unacknowledged mode | Setcom | - |
GP‑032350 | CR 051.010-1 52.1.2.1.9.4 Packet Uplink Assignment / Two phase access / Radio Access Capabilities/ Frequency band not supported. | Setcom | - |
GP‑032351 | CR 51.010-1-1690 42.1.2.1.10.2Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164. | Setcom | - |
GP‑032352 | CR 51.010-1- 52.1.2.1.10.2Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164. | Setcom | - |
GP‑032353 | CR 051.010-1 Use of correct PICS for SMS testcases and correction of some errors (34.4.1 to 34.4.7) | Setcom | - |
GP‑032354 | - | - | - |
GP‑032355 | 41.2.3.11 – Allow 2-phase access | Anite Telecoms | - |
GP‑032356 | 51.2.2.4 –Perform test during Attach to ensure the MS will attempt the packet access after T3146 expires | Anite Telecoms | - |
GP‑032357 | 53.1.2.3 - Assigning Window Size in {Downlink TBF establishment} | Anite Telecoms | - |
GP‑032358 | 42.3.3.1.2, 42.3.3.2.1, 42.3.3.2.2 and 42.3.3.3 – Set BS_CV_MAX to 1 in initial conditions. | Anite Telecoms | - |
GP‑032359 | 52.3.3.1.2, 52.3.3.2.1, 52.3.3.2.2 and 52.3.3.3 - Set BS_CV_MAX to 1 in initial conditions. | Anite Telecoms | - |
GP‑032360 | 46.1.2.1.1 – extend maximum duration | Anite Telecoms | - |
GP‑032361 | 51.2.3.11 – Allow 2-phase access | Anite Telecoms | - |
GP‑032362 | 42.3.2.1.2 – Correction of Ctrl_Ack Constraint. | Anite Telecoms | - |
GP‑032363 | Test case 41.3.2.2 does not allow for the MS under test to send a PACKET UPLINK DUMMY CONTROL BLOCK. | Panasonic | - |
GP‑032364 | T3330 is not being taken into account in a number of section 44 tests. | Panasonic | - |
GP‑032365 | The way that the T200 timer should be implemented is not clearly specified. | Panasonic | - |
GP‑032366 | Test case 51.3.2.2 does not allow for the MS under test to send a PACKET UPLINK DUMMY CONTROL BLOCK. | Panasonic | - |
GP‑032367 | PTCRB Alignment of Test Specification Work Plan Status | Ericsson Inc. | - |
GP‑032368 | Architecture principles for FLO | Siemens, Nokia | - |
GP‑032369 | Informative Annex on Multiple Transport Blocks per TrCH per TTI | Siemens | - |
GP‑032370 | Removal of informative Annex on two-stage interleaving | Siemens | - |
GP‑032371 | - | - | - |
GP‑032372 | - | - | - |
GP‑032373 | Re-instating sub-clause 10.5.2.5 Channel Description | MCC | - |
GP‑032374 | Correct case and message after message name. | 5.3.6.3Definition of Radio Re Management Functionality19 | - |
GP‑032375 | - | MCC | - |
GP‑032377 | TC 53.1.2.9 - Modification to Expected Message Sequence to cater to all iterations | Setcom | - |
GP‑032378 | TC 53.1.2.14 - Allowing uncompressed bitmap to be present in EGPRS Packet Downlink Ack/Nack | Setcom | - |
GP‑032379 | TC 52.3.2.2.1 - Correction to specific message contents of Packet Timeslot Reconfigure message (1st execution) | Setcom | - |
GP‑032380 | TC 31.4.3.2 - CM service acceptance procedure need to be done before Setup | Setcom | - |
GP‑032381 | TC 52.3.1.2.2 - Cell update need not be explicit in case of acknowledged mode RLC | Setcom | - |
GP‑032382 | Resources need to be allocated to the MS to perform Cell Update | - | - |
GP‑032383 | Addition of new NC2 testcases to Section 42.4 | Setcom | - |
GP‑032384 | Modification to Applicability Table due to introduction of new testcases in 3GPP TS 51.010-1 | Setcom | - |
GP‑032385 | CR 51.010-1 Section 20.22.5 Network controlled Cell re-selection in Idle Mode | Rohde & Schwarz | - |
GP‑032386 | CR 51.010-1 Section 21.3 Incorrect values for Max-samples | Rohde & Schwarz | - |
GP‑032387 | CR 51.010-1 Section 21.4 Incorrect values for Max-samples and missing definitions | Rohde & Schwarz | - |
GP‑032388 | CR 51.010-1 section 26.16.10.1 AMR signalling/ test of the channel mode modify procedure/ full rate | Rohde & Schwarz | - |
GP‑032389 | CR 51.010-1 section 26.16.10.2 AMR signalling/ test of the channel mode modify procedure/ half rate | Rohde & Schwarz | - |
GP‑032390 | CR 51.010-1 section 26.16.11 - Multirate configurations not specified when needed. | Rohde & Schwarz | - |
GP‑032391 | CR 51.010-1 Section 41.3.5.2 Incorrect step references in expected sequence | Rohde & Schwarz | - |
GP‑032392 | CR 51.010-1 Section 42.1.2.1.6 CHANGE_MARK_1 settings incorrect in PUAS message. | Rohde & Schwarz | - |
GP‑032393 | CR 51.010-1 Section 42.3.1.1.8 Mismatch between description in expected sequence and specific message contents | Rohde & Schwarz | - |
GP‑032395 | CR 51.010-1 Section 42.4.1.1 Invalid timer checks in expected sequence | Rohde & Schwarz | - |
GP‑032396 | CR 51.010-1 Section 42.4.1.2 Invalid timing requirement in step 2 | Rohde & Schwarz | - |
GP‑032397 | CR 51.010-1 Section 42.4.2.1.1 Incorrect reference in expected sequence | Rohde & Schwarz | - |
GP‑032398 | CR 51.010-1 Section 42.4.2.1.3 Test Case refers to non-existing Macro | Rohde & Schwarz | - |
GP‑032399 | CR 51.010-1 Section 42.8.3 Incorrect step number references in Expected Sequence | Rohde & Schwarz | - |
GP‑032400 | CR 51.010-1 Section 46.2.2.1.2 XID negotiation missing in expected Sequence. | Rohde & Schwarz | - |
GP‑032401 | CR 51.010-1 Section 46.2.2.1.3 Optional LLC message missing. | Rohde & Schwarz | - |
GP‑032402 | CR 51.010-1 Section 51.3.5.2 Incorrect step references in expected sequence | Rohde & Schwarz | - |
GP‑032403 | CR 51.010-1 Section 52.1.2.1.8.1.8 Missing PACKET DOWNLINK DUMMY CONTROL BLOCK | Rohde & Schwarz | - |
GP‑032404 | CR 51.010-1 Section 52.3.1.1.8 Mismatch between description in expected sequence and specific message contents | Rohde & Schwarz | - |
GP‑032405 | CR 51.010-1 Section 53.1.2.11 Implementation option in requirement check in step 7 missing | Rohde & Schwarz | - |
GP‑032406 | CR 51.010-1 Section 53.2.1.1 Step number missing | Rohde & Schwarz | - |
GP‑032407 | CR 51.010-1 Section 53.2.1.2 Step number missing | Rohde & Schwarz | - |
GP‑032408 | CR 51.010-1 Section 40.2.3 Timeslot restrictions in default PACKET UPLINK ASSIGNMENT and PACKET DOWNLINK ASSIGNMENT messages | Rohde & Schwarz | - |
GP‑032409 | CR 51.010-1 Section 42.4.3.2.3 Default PACKET MEASUREMENT ORDER message for section 42.4. | Rohde & Schwarz | - |
GP‑032410 | CR 51.010-1 Section 50.2.3 Timeslot restrictions in default PACKET UPLINK ASSIGNMENT and PACKET DOWNLINK ASSIGNMENT messages | Rohde & Schwarz | - |
GP‑032411 | CR 51.010-1 Section 43.2.1 Corrections in Specific Message Contents | Rohde & Schwarz | - |
GP‑032414 | CR 51.010-1 Section 47.3.1.1 Ready Timer too short. | Rohde & Schwarz | - |
GP‑032415 | CR 51.010-1 Section 52.1.1.5 | Rohde & Schwarz | - |
GP‑032416 | CR 51.010-1 Section 52.1.2.1.6 Incorrect step reference | Rohde & Schwarz | - |
GP‑032417 | CR 51.010-1 Section 52.1.2.1.8.1.2 Correction of step 3 | Rohde & Schwarz | - |
GP‑032420 | CR 51.010-1 Section 53.1.1.9 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032421 | CR 51.010-1 Section 53.1.1.13 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032422 | CR 51.010-1 Section 53.1.1.18 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032423 | CR 51.010-1 Section 53.1.1.19 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032424 | CR 51.010-1 Section 53.1.1.20 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032425 | CR 51.010-2 Test cases from section 53 missing | Rohde & Schwarz | - |
GP‑032426 | Liaison Statement on EC Requirements on Emergency Telecommunications | OCG EMTEL | - |
GP‑032427 | Reply LS on Special-RAND mechanism | CN1 | - |
GP‑032428 | LS on Special-RAND mechanism | CN4 | - |
GP‑032429 | LS on Call set-up delay reduction in GSM | RAN WG2 | - |
GP‑032430 | Reply LS on further guidance for Network Sharing in Rel-6 | RAN WG2 | - |
GP‑032431 | LS on Reporting of attempted UE positioning methods over Iu | TSG RAN2 | - |
GP‑032432 | LS on identified CRRM issues in Rel-5 | RAN3 | - |
GP‑032433 | Liaison on “Introduction of Positioning Methods over Iu” | TSG RAN3 | - |
GP‑032434 | LS regarding progress of work for MBMS User Services | SA1 | - |
GP‑032435 | Further questions on Service Id needs in the Access | SA WG2 | - |
GP‑032436 | LS on PDP context to SAPI mapping | SA2 | - |
GP‑032437 | Reply LS on “Reply LS on Network Sharing in GERAN” | SA2 | - |
GP‑032438 | LS on Special-RAND mechanism | SA3 | - |
GP‑032439 | Reply to LS on “Update of WID on MBMSUsage of RTCP & SDP in MBMS" | SA4 | - |
GP‑032440 | Reply to LS on “Usage of RTCP & SDP in MBMS" | TSG SA WG4 | - |
GP‑032441 | LS Reply on charging aspects of Priority Service (draft TR 22.952) | SA5 | - |
GP‑032442 | TC 42.3.1.2.2 - Cell update need not be explicit in case of acknowledged mode RLC | Setcom | - |
GP‑032443 | TC 42.3.2.2.1 - Correction to specific message contents of Packet Timeslot Reconfigure message (1st execution) | Setcom | - |
GP‑032444 | Resources need to be allocated to the MS to perform Cell Update | - | - |
GP‑032445 | Correction to testcase 53.1.2.3 | Setcom | - |
GP‑032446 | Correction to Inter-RAT (GPRS to UTRAN) Cell Change Order Test Cases | Motorola | - |
GP‑032447 | Correction to GMM test case 44.2.3.2.2 | Motorola | - |
GP‑032448 | Correction to GMM test case 44.2.3.3.3 | Motorola | - |
GP‑032449 | Correction to EGPRS RLC test case 51.3.1.3 | Motorola | - |
GP‑032450 | Corrections to EGPRS RLC test case 53.1.1.3 | Motorola | - |
GP‑032451 | Correction to EGPRS RLC test case 53.1.1.4 | Motorola | - |
GP‑032452 | Corrections to EGPRS RLC test case 53.1.1.7 | Motorola | - |
GP‑032453 | Correction to EGPRS RLC test case 53.1.1.16 | Motorola | - |
GP‑032454 | Corrections to EGPRS RLC test case 53.1.1.18 | Motorola | - |
GP‑032455 | Correction to A-GPS test cases in section 70.8 | Motorola | - |
GP‑032456 | MS-Based AGPS MOLR | Motorola | - |
GP‑032457 | Update PICS for MOLR MS-Based AGPS Test cases | Motorola | - |
GP‑032458 | Figure 1e | Nokia | - |
GP‑032459 | Flexible Layer One | Nokia | - |
GP‑032460 | Coding/Multiplexing unit for the Flexible Layer One | Nokia | - |
GP‑032461 | - | Nokia | - |
GP‑032462 | TFCS Reconfiguration in FLO | Nokia | - |
GP‑032463 | Flexible Layer One | Nokia | - |
GP‑032464 | Flexible Layer One | Nokia | - |
GP‑032465 | - | Nokia | - |
GP‑032466 | Flexible Layer One | Nokia | - |
GP‑032467 | Acronyms for the Flexible Layer One | Nokia | - |
GP‑032468 | Identification of Further Simulations Required in SAIC Feasibility Study | Vodafone, T-Mobile USA, TeliaSonera, AWS | - |
GP‑032469 | Incorrect incorporation of CR 007 | Siemens | - |
GP‑032470 | Definition of signalling TFC | Nokia & Siemens | - |
GP‑032471 | - | - | - |
GP‑032472 | Signalling on half rate channels | Siemens | - |
GP‑032473 | - | - | - |
GP‑032474 | - | - | - |
GP‑032475 | - | - | - |
GP‑032476 | - | - | - |
GP‑032477 | - | - | - |
GP‑032478 | Addition of “Cell selection indicator after release of all TCH and SDCCH” to CHANNEL RELEASE message | T-Mobile | - |
GP‑032479 | Enhancement for cell selection after release of channel | T-Mobile | - |
GP‑032480 | Addition of “cell selection indication” for cell selection at release of TCH or SDCCH | T-Mobile | - |
GP‑032481 | RIM and NACC clean-up | Siemens | - |
GP‑032483 | Addition of Additive White Gaussian Noise (AWGN) as a standard test signal in Annex 5, clause A5.2. | Nokia | - |
GP‑032484 | Alignment of Conformance Requirement for clause 27.17.1.2 with TS 102 230. | Nokia & ORGA | - |
GP‑032485 | Addition of GPRS RESUMPTION in Channel Release in the macros in section 40 - Default messages. | Nokia | - |
GP‑032486 | Correction of Test Procedure and Expected Sequence for section 41.5.1.1.1.4 Uplink TBF establishment with no reallocation of CS resources / Abnormal cases / Inter System to UTRAN Handover Command | - | - |
GP‑032487 | Clarification of the FBI bit in clause 42.1.2.2.6 - Packet Downlink Assignment Timing Advance / TA value field not provided | Nokia | - |
GP‑032488 | Correction of amount of data to be triggered in clause 42.3.1.1.2 - Dynamic Allocation / Uplink Transfer / Normal / Request new resources | - | - |
GP‑032489 | Correction of Expected Sequence for section 42.4.5.1 Network Assisted Cell Change / Expiry of T3206 | Nokia | - |
GP‑032490 | Functional and editorial corrections for clause 42.4.5.4 - Network Assisted Cell Change / Packet Neighbour Cell Data and Packet Cell Change Order | Nokia | - |
GP‑032491 | Functional and editorial corrections for clause 42.4.5.5 - Network Assisted Cell Change / Expiry of T3208 and T3210 | Nokia | - |
GP‑032492 | Setting CTRL_ACK_TYPE=0 in the Initial Conditions for clause 42.5.1.2 - Downlink Transfer/ Normal Operation / Without TBF starting time | Nokia / Rohde & Schwarz | - |
GP‑032493 | Clarification of the FBI bit in clause 52.1.2.2.6 - Packet Downlink Assignment Timing Advance / TA value field not provided | Nokia | - |
GP‑032494 | Correction of amount of data to be triggered in clause 52.3.1.1.2 - Dynamic Allocation / Uplink Transfer / Normal / Request new resources | - | - |
GP‑032495 | Spilt of Multislot Classes for HSCSD, GPRS and EGPRS. | Nokia | - |
GP‑032496 | - | - | - |
GP‑032497 | - | Cingular Wireless | - |
GP‑032498 | SAIC: Items for further study | TSG GERAN SAIC Ad Hoc #3 | - |
GP‑032499 | CR to the building block U-TDOA, CS domain work item | T-Mobile USA, TruePosition | - |
GP‑032500 | Uplink TDOA location determination for GSM/GPRS, PS domain | ResCommunications, Motorola, TruePosition | - |
GP‑032501 | Inclusion of Channel Mode Modify RR Procedures for U-TDOA calls. | Andrew, TruePosition | - |
GP‑032502 | 51.010-1 sections 14 and 21 receiver tests - selection of ARFCNs with fading and hopping | Racal Instruments Wireless Solutions | - |
GP‑032504 | Correction of LCS Cause IE Length in BSSAP-LE Messages | Siemens AG | - |
GP‑032505 | Correction to TC's 26.16.1, 26.16.9.11 and 26.16.9.12 | Ericsson | - |
GP‑032506 | Correction to recursive CSN.1 coding for MULTIPLE TBF UPLINK/DOWNLINK ASSIGNMENT messages | Siemens | - |
GP‑032507 | Correction to recursive CSN.1 coding for MULTIPLE TBF UPLINK/DOWNLINK ASSIGNMENT messages | Siemens | - |
GP‑032508 | Minor corrections to multiple TBF assignment message coding | Siemens | - |
GP‑032509 | Addition of multiple TBF procedures to Immediate Assignment, DTM assignment and DTM Request messages | Siemens | - |
GP‑032510 | [ | 6.1Re management procedures9 | - |
GP‑032511 | - | - | - |
GP‑032512 | - | - | - |
GP‑032513 | - | - | - |
GP‑032514 | CR 51.010-1 42.4.6.5Network Control PEMR – Downlink Data Transfer | Setcom | - |
GP‑032515 | 51.010-1 TC 42.4.2.3.4 Packet Measurement order procedure / Downlink transfer / Normal case/ Routing Area Update/ NMO II | setcom | - |
GP‑032516 | 51.010-1 TC 42.4.2.3.5 Packet Measurement order procedure / Downlink transfer / Normal case/ Routing Area Update/ NMO I | setcom | - |
GP‑032517 | Addition of “Cell selection indicator after release of all TCH and SDCCH” to CHANNEL RELEASE message | T-Mobile | - |
GP‑032518 | Addition of “cell selection indication” for cell selection at release of TCH or SDCCH | T-Mobile | - |
GP‑032519 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032520 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032521 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032522 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032523 | Addition of rules for handling PFC procedures in RLC/MAC in case PFI values are not excplicitly allocated for the MS | Nokia | - |
GP‑032524 | Correction of applicability of NC measurement reporting parameters in context with dedicated mode connections | - | - |
GP‑032525 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032526 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032527 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032528 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032529 | - | Rapporteur | - |
GP‑032530 | TC: 14.10.X Performance of the Codec Mode Request Generation | Nokia, Siemens | - |
GP‑032531 | TC: 20.22.9 Cell reselection when the best cell does not support GPRS | Siemens | - |
GP‑032532 | TC: 31.X.: Change in Bearer Service Code | Siemens | - |
GP‑032533 | RIM/extNACC simple solution for Rel-5 | Nokia | - |
GP‑032534 | Gap in Numbering in the PFC Flow Control parameters IE | Siemens AG | - |
GP‑032535 | Gap in Numbering in the PFC Flow Control parameters IE | Siemens AG | - |
GP‑032536 | Service Handover for services not supported in GERAN | Siemens AG | - |
GP‑032537 | Service Handover for services not supported in GERAN | Siemens | - |
GP‑032538 | Packet Forwarding for PS Handover | Siemens AG | - |
GP‑032539 | CR to conversational TR: Packet Forwarding for PS Handover | Siemens AG | - |
GP‑032540 | A Mechanism for the Distribution of RR-Specific System Information | Siemens AG | - |
GP‑032541 | Corrections to the MTBF changes in section 8 | Siemens AG | - |
GP‑032542 | Correction to the MTBF abnormal release | Siemens AG | - |
GP‑032543 | MS behaviour on reception of assignment messages | Siemens AG | - |
GP‑032544 | Alignment of DTM procedure description to Error handling definition | Siemens AG | - |
GP‑032545 | - | - | - |
GP‑032548 | Reduction of PS service interruption in Dual Transfer Mode | Siemens | - |
GP‑032549 | Reduction of PS service interruption in Dual Transfer Mode / Use case and requirement definition | Siemens | - |
GP‑032550 | Reduction of PS service interruption in Dual Transfer Mode / Performance Study of Current Procedures | Siemens | - |
GP‑032551 | Reduction of PS service interruption in Dual Transfer Mode / Reduction of service interruption times and packet loss during Dual Transfer Mode and mobility procedures | Siemens | - |
GP‑032552 | - | - | - |
GP‑032553 | Correction due to change of DTM core capability | Ericsson | - |
GP‑032554 | Correction due to change of DTM core capability | Ericsson | - |
GP‑032555 | Correction due to change of DTM core capability | Ericsson | - |
GP‑032556 | Correction due to change of DTM core capability | Ericsson | - |
GP‑032557 | Improved “Delayed Uplink TBF Release” | Ericsson | - |
GP‑032558 | Improved “Delayed Uplink TBF Release” | Ericsson | - |
GP‑032559 | Improved “Delayed Uplink TBF Release” | Ericsson | - |
GP‑032560 | Improved “Delayed Uplink TBF Release” | Ericsson | - |
GP‑032561 | Correction of faulty mirror CR | Ericsson | - |
GP‑032562 | Correction of faulty mirror CR | Ericsson | - |
GP‑032563 | Correction of faulty mirror CR | Ericsson | - |
GP‑032564 | Combination of Extended Dynamic Allocation and USF_GRANULARITY=4 | Ericsson, Nortel, Alcatel | - |
GP‑032565 | CR 51.010-1 Section 40.2.4.35 MNC not specified correctly for different bands | Rohde & Schwarz | - |
GP‑032566 | CR 51.010-2 Correction of test numbers in section 21.3 | Rohde & Schwarz | - |
GP‑032567 | - | - | - |
GP‑032568 | - | - | - |
GP‑032569 | - | Nokia | - |
GP‑032570 | - | - | - |
GP‑032571 | Introduction of multiple TBFs into section 8 | Ericsson | - |
GP‑032572 | Introducing MTBF Support | Ericsson | - |
GP‑032573 | Introducing MTBF Support | Ericsson | - |
GP‑032574 | Clarifications of fields used for MS assisted AGPS | Ericsson | - |
GP‑032575 | Clarifications of fields used for MS assisted AGPS | Ericsson | - |
GP‑032576 | Clarifications of fields used for MS assisted AGPS | Ericsson | - |
GP‑032577 | Clarifications of fields used for MS assisted AGPS | Ericsson | - |
GP‑032578 | - | - | - |
GP‑032579 | - | - | - |
GP‑032580 | - | - | - |
GP‑032581 | - | Ericsson | - |
GP‑032582 | - | - | - |
GP‑032583 | - | - | - |
GP‑032584 | - | - | - |
GP‑032585 | Design Information for MBMS | Vodafone | - |
GP‑032586 | Introduction of LCS QoS Class | Vodafone | - |
GP‑032587 | - | Cingular | - |
GP‑032588 | - | Cingular | - |
GP‑032589 | Introduction of FLO | Nokia | - |
GP‑032590 | - | Nokia | - |
GP‑032591 | Introduction of FLO | NOKIA | - |
GP‑032592 | - | - | - |
GP‑032593 | - | Nokia | - |
GP‑032594 | Mapping of SRB on different DBPSCHs | Nokia | - |
GP‑032595 | Mapping of SRB on different DBPSCHs | Nokia | - |
GP‑032596 | Introduction of FLO | Nokia | - |
GP‑032597 | Introduction of Flexible Layer One | Nokia | - |
GP‑032598 | Packet Ack/Nack messages for FLO | Nokia | - |
GP‑032599 | - | - | - |
GP‑032600 | - | - | - |
GP‑032601 | - | - | - |
GP‑032602 | - | - | - |
GP‑032603 | - | - | - |
GP‑032604 | - | Siemens | - |
GP‑032605 | - | Siemens | - |
GP‑032606 | - | Siemens | - |
GP‑032607 | Corrections to several inconsistencies | Siemens | - |
GP‑032608 | Corrections to several inconsistencies | Siemens | - |
GP‑032609 | Correction to the Coding of SNA Access Information IE | Nokia | - |
GP‑032610 | Correction to the Coding of SNA Access Information IE | Nokia | - |
GP‑032611 | Cause value “Access Restricted Due to Shared Networks” | Nokia | - |
GP‑032612 | Cause value “Access Restricted Due to Shared Networks” | Nokia | - |
GP‑032613 | - | - | - |
GP‑032614 | - | - | - |
GP‑032615 | - | Nortel Networks | - |
GP‑032616 | 11 information bits access burst on RACH | Nortel Networks | - |
GP‑032617 | DTM assignment & AMR default inband signalling phase | Nokia, Nortel Networks | - |
GP‑032618 | Considerations on Network Sharing aspects | Motorola | - |
GP‑032619 | - | Nokia, Siemens, Ericsson | - |
GP‑032620 | Correction to CRRM solution | Nokia | - |
GP‑032621 | Addition of FLO capability flag to Classmark 3 IE | NOKIA | - |
GP‑032622 | Draft Report of the MBMS Joint Meeting v. 0.0.4 | MBMS SA1/SA2/SA4/RAN1/RAN2/RAN3/RAN4/GERAN1/GERAN2 Joint Meeting Secretary | - |
GP‑032623 | LS on Speech Enabled Services Impacts for GERAN | SA2 | - |
GP‑032624 | LS on removal of CC test 10.1.3.3.3 from TS34.123 | T1 | - |
GP‑032626 | - | - | - |
GP‑032627 | Clarification on the Packet Flow Identifier change procedure | STMicroelectronics | - |
GP‑032628 | Definition of "RACH uplink / Uplink access burst" block format | Nortel Networks | - |
GP‑032629 | MBMS - TMGI in GERAN | Nortel Networks | - |
GP‑032630 | Synchronization of GPRS and EGPRS requirements for ACK/NACK generation | Motorola | - |
GP‑032631 | Retransmission order of NACKED and PENDING_ACK blocks after reception of ACK/NACK message | Motorola | - |
GP‑032632 | Clarification on CPS field setting for MCS-3 retransmissions of MCS-8 blocks | Motorola | - |
GP‑032633 | Correction on Dedicated Mode or TBF Information Element format (Recover from v8.16.0) | Motorola | - |
GP‑032634 | Padding for MCS-8 retransmissions | Motorola | - |
GP‑032635 | Padding for MCS-8 retransmissions | Motorola | - |
GP‑032636 | Padding for MCS-8 retransmissions | Motorola | - |
GP‑032637 | Padding for MCS-8 retransmissions | Motorola | - |
GP‑032638 | Storage of the last location estimate in the BSS | Alcatel | - |
GP‑032639 | Location Estimate in Perform Location Request | Alcatel | - |
GP‑032640 | Location Estimate in Old BSS to new BSS information | Alcatel | - |
GP‑032641 | Inclusion of ellipsoid point with altitude in MAP | Alcatel | - |
GP‑032642 | New test cases: NACC | Alcatel | - |
GP‑032643 | New test cases: NACC | Alcatel | - |
GP‑032644 | New test case: I_level reporting | Alcatel | - |
GP‑032645 | New test case: I_level reporting | Alcatel | - |
GP‑032646 | Use of RACH uplink / Uplink access burst block format for the 11 bits EGPRS PACKET CHANNEL REQUEST on RACH | Nortel Networks | - |
GP‑032647 | - | - | - |
GP‑032648 | - | - | - |
GP‑032649 | - | - | - |
GP‑032650 | - | - | - |
GP‑032651 | - | - | - |
GP‑032652 | CR to the building block U-TDOA, PS domain work item | Cingular Wireless, T-Mobile USA, SBC Communications, Motorola, Andrews Corporation, TruePosition | - |
GP‑032654 | - | Source | - |
GP‑032655 | Addition of multiple TBF procedures to Immediate Assignment, DTM assignment and DTM Request messages | Siemens | - |
GP‑032656 | Correction of the handling PSI messages while in dual transfer mode | Nokia | - |
GP‑032657 | Establishment of downlink TBF after downlink TBF release, abnormal cases | Siemens AG | - |
GP‑032658 | CR 44.060-442: Correction to (EGPRS) Packet Downlink Ack/Nack for multiple TBFs in A/Gb mode | Siemens | - |
GP‑032659 | Network Indication of MTBF Support | Ericsson | - |
GP‑032660 | Handling of key sets at Inter-mode Handover (UTRAN-GERAN alignment) | Nokia | - |
GP‑032661 | START calculation in RRC-Connected mode (UTRAN-GERAN alignment) | Nokia | - |
GP‑032662 | UTRAN-GERAN Handover | Nokia | - |
GP‑032663 | Correction on PDCP Header Compression Configuration (UTRAN-GERAN alignment) | Nokia | - |
GP‑032664 | Correction of PDCP Configuration for RFC 2507(GERAN –UTRAN alignment ) | Nokia | - |
GP‑032665 | Radio link failure during reconfiguration procedure (UTRAN-GERAN alignment) | Nokia | - |
GP‑032666 | Correction to circuit pool change during assignment modification | Nokia | - |
GP‑032667 | Correction to circuit pool change during assignment modification | Nokia | - |
GP‑032668 | Adding Channel Mode and MultiRate Configuration IEs to U-TDOA messages. | Andrew Corporation, AT&T Wireless, Cingular Wireless and TruePosition. | - |
GP‑032669 | Correction of BSSLAP Abort Direction of Transfer | Siemens AG | - |
GP‑032670 | LS on Consideration of emerging issues on maintenance of InterRAT test cases | T1 | - |
GP‑032671 | - | Nokia | - |
GP‑032672 | - | Nokia | - |
GP‑032673 | Title | Source | - |
GP‑032674 | - | - | - |
GP‑032675 | - | - | - |
GP‑032676 | Proposed Text for SAIC TR Section 9 (Testing) | Motorola, Nokia | - |
GP‑032678 | - | - | - |
GP‑032679 | - | - | - |
GP‑032680 | - | - | - |
GP‑032681 | Reply LS on PDP context to SAPI mapping | GERAN2 | - |
GP‑032682 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032683 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032684 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032685 | Correction to NC reporting before GSM Neighbour Cell List is acquired | Nokia | - |
GP‑032686 | Correction on Dedicated Mode or TBF Information Element format (Recover from v8.16.0) | Motorola | - |
GP‑032687 | - | - | - |
GP‑032688 | Design Information for MBMS | Vodafone | - |
GP‑032689 | LS on issues related to SNA Access Information | TSG GERAN | - |
GP‑032690 | Correction to CRRM solution | Nokia | - |
GP‑032691 | Correction to CRRM solution | Nokia | - |
GP‑032692 | Gap in Numbering in the PFC Flow Control parameters IE | Siemens AG | - |
GP‑032693 | Gap in Numbering in the PFC Flow Control parameters IE | Siemens AG | - |
GP‑032694 | Corrections to several inconsistencies | Siemens | - |
GP‑032695 | Corrections to several inconsistencies | Siemens | - |
GP‑032696 | LS on Preservation for real time PDP contexts in A/Gb mode | GERAN WG2 | - |
GP‑032697 | Introducing MTBF Support | Ericsson | - |
GP‑032698 | Introducing MTBF Support | Ericsson | - |
GP‑032699 | Addition of multiple TBF procedures to Immediate Assignment, DTM assignment and DTM Request messages | Siemens | - |
GP‑032700 | Minor corrections to multiple TBF assignment message coding | Siemens | - |
GP‑032701 | Architecture and signalling principles for FLO | Siemens, Nokia | - |
GP‑032702 | [DRAFT] Acronyms and Definitions for the Flexible Layer One | TSG GERAN | - |
GP‑032703 | Introduction of FLO | Nokia | - |
GP‑032704 | Introduction of FLO | Nokia | - |
GP‑032705 | Introduction of Flexible Layer One | Nokia | - |
GP‑032706 | Packet Ack/Nack messages for FLO | Nokia | - |
GP‑032707 | - | - | - |
GP‑032708 | LS on the Addition of FLO capability for GERAN Iu mode to MS RAC IE | 3GPP TSG GERAN WG 2 | - |
GP‑032709 | Flexible Layer One | Nokia | - |
GP‑032710 | - | - | - |
GP‑032711 | Introduction of Flexible Layer One | Nokia | - |
GP‑032712 | Introduction of FLO | Nokia | - |
GP‑032713 | Further questions on Service Id needs in the Access | GERAN WG2 | - |
GP‑032714 | - | - | - |
GP‑032715 | Introduction of multiple TBFs into section 8 | Ericsson | - |
GP‑032716 | Correction to the MTBF abnormal release | Siemens AG | - |
GP‑032717 | MS behaviour on reception of assignment messages | Siemens AG | - |
GP‑032718 | Coordination of Positioning Methods between TSG GERAN and TSG RAN | TSG GERAN | - |
GP‑032719 | - | - | - |
GP‑032720 | - | - | - |
GP‑032721 | Reply to LS on Consideration of emerging issues on maintenance of Inter RAT test cases | TSG GERAN | - |
GP‑032722 | LS on removal of CC test 26.8.1.3.3.3 from TS51.010 | TSG GERAN WG3 | - |
GP‑032723 | TC: 14.10.X Performance of the Codec Mode Request Generation | Nokia, Siemens | - |
GP‑032724 | New test case: I_level reporting | Alcatel | - |
GP‑032725 | New test case: I_level reporting | Alcatel | - |
GP‑032726 | New test cases: NACC | Alcatel | - |
GP‑032727 | 51.010-1 TC 42.4.6.5Network Control PEMR – Downlink Data Transfer | setcom | - |
GP‑032728 | 51.010-1 TC 42.4.2.3.5 Packet Measurement order procedure / Downlink transfer / Normal case/ Routing Area Update/ NMO I | setcom | - |
GP‑032729 | Addition of GPRS RESUMPTION in Channel Release in the macros in section 40 - Default messages. | Nokia | - |
GP‑032730 | Changing the frequency of USF allocation to MS in 41.2.3.10. | SASKEN | - |
GP‑032731 | 41.2.3.11 – MS may make two-phase access | Anite Telecoms | - |
GP‑032732 | CR 51.010-1 42.4.2.3.1 Cell change order procedure / Simultaneous uplink and downlink transfer / Normal case | setcom | - |
GP‑032733 | 42.4.2.3.1 – Allowing the reception of PACKET MEASUREMENT REPORTs in Cell A. | SASKEN | - |
GP‑032734 | Correction of Test Procedure and Expected Sequence for section 41.5.1.1.1.4 Uplink TBF establishment with no reallocation of CS resources / Abnormal cases / Inter System to UTRAN Handover Command | - | - |
GP‑032735 | CR 51.010-1 42.4.2.3.7 MT CS establishment whilst in NC2 with a uplink TBF established | Setcom | - |
GP‑032736 | CR 51.010-1 42.4.6.4Network Control PEMR – Uplink Data Transfer | Setcom | - |
GP‑032737 | TC 42.3.1.2.2 - Cell update need not be explicit in case of acknowledged mode RLC | Setcom | - |
GP‑032738 | Resources need to be allocated to the MS to perform Cell Update | - | - |
GP‑032739 | Functional and editorial corrections for clause 42.4.5.5 - Network Assisted Cell Change / Expiry of T3208 and T3210 | Nokia | - |
GP‑032740 | Setting CTRL_ACK_TYPE=0 in the Initial Conditions for clause 42.5.1.2 - Downlink Transfer/ Normal Operation / Without TBF starting time | Nokia / Rohde & Schwarz | - |
GP‑032741 | 51.010-1 TC 42.4.6.5Network Control PEMR – Downlink Data Transfer | setcom | - |
GP‑032742 | 51.010-1 TC 44.2.3.3.2 Periodic routing area updating / accepted / T3312 default value | Siemens | - |
GP‑032743 | 51.010-1 TC 44.2.3.3.1 Periodic routing area updating / accepted | Siemens | - |
GP‑032744 | Changes to final steps of 46.2.2.1.1 | WAVECOM | - |
GP‑032745 | Implementation of T200 timer. | TSG GERAN WG3 | - |
GP‑032746 | CR 51.010-1 Section 46.2.2.1.3 Optional LLC message missing. | Rohde & Schwarz | - |
GP‑032747 | Test case 41.3.2.2 does not allow for the MS under test to send a PACKET UPLINK DUMMY CONTROL BLOCK. | Panasonic | - |
GP‑032748 | Test case 51.3.2.2 does not allow for the MS under test to send a PACKET UPLINK DUMMY CONTROL BLOCK. | Panasonic | - |
GP‑032749 | 51.2.3.11 – MS may make two-phase access | Anite Telecoms | - |
GP‑032750 | 51.010-1 TC 44.2.3.1.4 Routing area updating / rejected / location area not allowed | Siemens | - |
GP‑032752 | TC 52.3.1.2.2 - Cell update need not be explicit in case of acknowledged mode RLC | Setcom | - |
GP‑032753 | Resources need to be allocated to the MS to perform Cell Update | - | - |
GP‑032754 | CR 51.010-1 Section 53.1.1.19 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032755 | Corrections to EGPRS RLC test case 53.1.1.3 | Motorola | - |
GP‑032756 | CR 51.010-1 Section 20.22.5 Network controlled Cell re-selection in Idle Mode | Rohde & Schwarz | - |
GP‑032757 | CR 51.010-1 Section 47.3.1.1 Ready Timer too short. | Rohde & Schwarz | - |
GP‑032758 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Motorola | - |
GP‑032759 | Location updating/periodic search for higher priority PLMN when the list of equivalent PLMNs includes the HPLMN, when a MS is registered in a foreign country’s VPLMN/MS is in automatic mode | Motorola | - |
GP‑032760 | Addition of new NC2 testcases to Section 42.4 | Setcom | - |
GP‑032761 | [DRAFT] LS on Speech Enabled Services Impacts for GERAN | TSG-GERAN | - |
GP‑032762 | Addition of “cell selection indication” for cell selection at release of TCH or SDCCH | T-Mobile | - |
GP‑032763 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032764 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032765 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032766 | Correction to applicability of NC measurement reporting parameters in context with dedicated mode connections | Nokia | - |
GP‑032767 | Coding/Multiplexing unit for the Flexible Layer One | Nokia | - |
GP‑032768 | Architecture and signalling principles for FLO | Siemens, Nokia | - |
GP‑032770 | Acronyms for the Flexible Layer One | Nokia | - |
GP‑032771 | Introduction of FLO | Nokia | - |
GP‑032772 | Flexible Layer One | Nokia | - |
GP‑032773 | Uplink TDOA location determination for GSM/GPRS, CS domain (revised) | ResCommunications, Motorola, TruePosition | - |
GP‑032774 | Uplink TDOA location determination for GSM/GPRS, PS domain (revised) | ResCommunications, Motorola, TruePosition | - |
GP‑032775 | DTM assignment & AMR default inband signalling phase | Nokia, Nortel Networks | - |
GP‑032776 | Modification to Applicability Table due to introduction of new testcases in 3GPP TS 51.010-1 | Setcom | - |
GP‑032777 | 51.010-1 TC 42.4.2.3.4 Packet Measurement order procedure / Downlink transfer / Normal case/ Routing Area Update/ NMO II | Setcom | - |
GP‑032778 | Removal of test case 26.8.1.3.3.3 Incoming call / U9 mobile terminating call confirmed / termination requested by the user | - | - |
GP‑032779 | Removal of test case 26.8.1.3.3.3 Incoming call / U9 mobile terminating call confirmed / termination requested by the user | - | - |
GP‑032780 | 51.010-1 sections 14 and 21 receiver tests - selection of ARFCNs with fading and hopping | Racal Instruments Wireless Solutions | - |
GP‑032781 | New test cases: NACC | Alcatel | - |
GP‑032782 | CR 51.010-1 Section 53.1.1.19 Correction of test procedure. | Rohde & Schwarz | - |
GP‑032783 | Implementation of T200 timer. | GERAN WG#3 | - |
GP‑032784 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Motorola | - |
GP‑032785 | - | - | - |
GP‑032786 | Progress of the NC2 Workplan. | TSG GERAN WG3 | - |
GP‑032787 | LS on GERAN WG3 progress on the R99 GPRS Workplan. | TSG GERAN | - |
GP‑032788 | Progress of the NC2 Workplan. | TSG GERAN WG3 | - |
GP‑032789 | - | - | - |
GP‑032790 | PTCRB Alignment of Test Specification Work Plan Status | Ericsson Inc., Cingular Wireless LLC | - |
GP‑032791 | Progress of the PTCRB Alignment of Test Specification Work Plan | TSG GERAN WG3 | - |
GP‑032792 | - | - | - |
GP‑032793 | - | - | - |
GP‑032794 | - | - | - |
GP‑032795 | - | - | - |
GP‑032796 | Block Code sequences for 5-bit TFCI | Siemens, Nokia | - |
GP‑032797 | Addition of rules for handling PFC procedures in RLC/MAC in case PFI values are not excplicitly allocated for the MS | Nokia | - |
GP‑032798 | Alignment of DTM procedure description to Error handling definition | Siemens AG | - |
GP‑032799 | Addition of “Cell selection indicator after release of all TCH and SDCCH” to CHANNEL RELEASE message | T-Mobile | - |
GP‑032800 | Definition of "RACH uplink / Uplink access burst" block format | Nortel Networks | - |
GP‑032801 | Clarification on CPS field setting for MCS-3 retransmissions of MCS-8 blocks | Motorola | - |
GP‑032802 | MS behaviour on reception of assignment messages | Siemens AG | - |
GP‑032803 | Introduction of multiple TBFs into section 8 | Ericsson | - |
GP‑032804 | Correction to the MTBF abnormal release | Siemens AG | - |
GP‑032805 | Introduction of FLO | Nokia | - |
GP‑032806 | Introduction of Flexible Layer One | Nokia | - |
GP‑032807 | Packet Ack/Nack messages for FLO | Nokia | - |
GP‑032808 | - | - | - |
GP‑032809 | Clarification on CPS field setting for MCS-3 retransmissions of MCS-8 blocks | Motorola | - |
GP‑032810 | [DRAFT] Reply to LS on identified CRRM issues in Rel-5 | TSG GERAN | - |
GP‑032811 | - | - | - |
GP‑032812 | Delay analysis for Cell Selection re-direction to UMTS after call release in GSM after 3G to 2G Handover | T-Mobile | - |
GP‑032813 | Addition of “cell selection indication” for cell selection at release of TCH or SDCCH | T-Mobile | - |
GP‑032814 | Draft Report of TSG GERAN WG1 meeting #17, version 0.0.1 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑032815 | Reply LS on PDP context to SAPI mapping | GERAN2 | - |
GP‑032816 | LS on issues related to SNA Access Information | TSG GERAN WG2 | - |
GP‑032817 | LS on Preservation for real time PDP contexts in A/Gb mode | GERAN WG2 | - |
GP‑032818 | Further questions on Service Id needs in the Access Network | GERAN WG2 | - |
GP‑032819 | Title | Nokia, Ericsson, Motorola, Siemens, Nortel, Philips, Intel, AWS, Cingular, Vodafone. | - |
GP‑032820 | Title | Nokia, Ericsson, Motorola, Siemens, Nortel, Philips, Intel, AWS, Cingular, Vodafone. | - |
GP‑032821 | Title | Nokia, Ericsson, Motorola, Siemens, Nortel, Philips, Intel, AWS, Cingular, Vodafone. | - |
GP‑032822 | Title | Nokia, Ericsson, Motorola, Siemens, Nortel, Philips, Intel, AWS, Cingular, Vodafone. | - |
GP‑032823 | Title | Nokia, Ericsson, Motorola, Siemens, Nortel, Philips, Intel, AWS, Cingular, Vodafone. | - |
GP‑032824 | Title | Nokia, Ericsson, Motorola, Siemens, Nortel, Philips, Intel, AWS, Cingular, Vodafone. | - |
GP‑032825 | Speech Enabled Services Impacts for GERAN | TSG-GERAN | - |
GP‑032826 | - | Rapporteur | - |
page generated from database: 2024-04-22 07:58:53