3GPP TDocs (written contributions) at meeting
Meeting: R1-66b - 2011-10-10 to 2011-10-14, Zhuhai
meeting id: R1-66b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑112885 | Draft Agenda for RAN1#66bis meeting | RAN1 Chairman | Approved |
R1‑112886 | Final report of RAN1#66 meeting | MCC Support | Approved |
R1‑112887 | Selected highlights from RAN#53 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑112888 | Response LS on timing advance calculation using time difference measurement | RAN4, Renesas Mobile | Noted |
R1‑112889 | Reply LS to LS on Equivalent PLMN identities and MDT | SA5, Huawei | Noted |
R1‑112890 | Uplink signaling enhancements in carrier aggregation | Huawei, HiSilicon | Noted |
R1‑112891 | Transmit diversity scheme for format 1b with channel selection | Huawei, HiSilicon | Noted |
R1‑112892 | Discussion on inter-band TDD CA with different UL-DL configurations | Huawei, HiSilicon | Noted |
R1‑112893 | Additional carrier types – motivations and issues | Huawei, HiSilicon | Noted |
R1‑112894 | Performance Evaluation of Cell Range Extension | Huawei, HiSilicon | Noted |
R1‑112895 | TX-based solution for further evaluation | Huawei, HiSilicon | Noted |
R1‑112896 | Framework for multi-point CSI feedback enhancements for CoMP | Huawei, HiSilicon | Noted |
R1‑112897 | Performance comparison of multi-point CSI feedback in CoMP Scenario 4 | Huawei, HiSilicon | Noted |
R1‑112898 | Single-point CSI feedback and utilization for MU-MIMO and considerations for testing | Huawei, HiSilicon | Noted |
R1‑112899 | Single point CSI feedback enhancements for MU-MIMO performance | Huawei, HiSilicon | Noted |
R1‑112900 | DMRS enhancements for CoMP | Huawei, HiSilicon | Noted |
R1‑112901 | Channel and interference measurements | Huawei, HiSilicon | Not treated |
R1‑112902 | CSI-RS configuration and signaling | Huawei, HiSilicon | Noted |
R1‑112903 | CSI-RS port selection for geographically separated antennas | Huawei, HiSilicon | Noted |
R1‑112904 | Transmission modes for downlink CoMP | Huawei, HiSilicon | Noted |
R1‑112905 | Transmission set indication in downlink CoMP | Huawei, HiSilicon | Noted |
R1‑112906 | Views on UL CoMP standard support | Huawei, HiSilicon | Noted |
R1‑112907 | UL reference signal enhancements | Huawei, HiSilicon | Not treated |
R1‑112908 | Power control design for UL CoMP scenario 3 and 4 | Huawei, HiSilicon | Not treated |
R1‑112909 | Investigation on PUCCH enhancements | Huawei, HiSilicon | Not treated |
R1‑112910 | Discussion on the impact of time misalignment in real life transmission | Huawei, HiSilicon | Noted |
R1‑112911 | Discussion on the deployment scenarios and motivations for E-PDCCH | Huawei, HiSilicon | Noted |
R1‑112912 | Overview on low-cost MTC UEs based on LTE | Huawei, HiSilicon, CMCC | Noted |
R1‑112913 | Discussion on CQI definition for CoMP schemes | Intel Corporation | Not treated |
R1‑112914 | Performance evaluation of JT schemes in system with practical impairments | Intel Corporation | Not treated |
R1‑112915 | Discussion on interference measurements for CoMP | Intel Corporation | Not treated |
R1‑112916 | On uplink DM-RS enhancements for UL CoMP | Intel Corporation | Not treated |
R1‑112917 | Considerations on Approaches for Low-Cost MTC UEs | Sony Corporation/Sony Europe Limited | Not treated |
R1‑112918 | Summary of email discussion on DCI format 3/3A | Ericsson, ST-Ericsson | Noted |
R1‑112919 | 36.213 CR0324R1 (Rel-10, Cat F) Accumulation of power control commands from DCI format 3/3A with UL transmission | Ericsson, ST-Ericsson | Noted - Revised |
R1‑112920 | Control signalling enhancements for CA-based HetNet and inter-band deployments | Ericsson, ST-Ericsson | Not treated |
R1‑112921 | Periodic CSI and A/N reporting for CA | Ericsson, ST-Ericsson | Not treated |
R1‑112922 | Transmit diversity for PUCCH Format 3 | Ericsson, ST-Ericsson | Revised |
R1‑112923 | Applicable scenarios for TDD CA of different UL-DL configurations | Ericsson, ST-Ericsson | Revised |
R1‑112924 | Considerations on use cases for additional carrier types | Ericsson, ST-Ericsson | Noted |
R1‑112925 | Discussion on design principles for additional carrier types | Ericsson, ST-Ericsson | Noted |
R1‑112926 | On time and frequency synchronization on additional carrier types | Ericsson, ST-Ericsson | Noted |
R1‑112927 | Enhancements for Uplink Power Control | Ericsson, ST-Ericsson | Revised |
R1‑112928 | On enhanced PDCCH design | Ericsson, ST-Ericsson | Noted |
R1‑112929 | Standards aspects impacting UE costs | Ericsson, ST-Ericsson | Not treated |
R1‑112930 | Standardization impact of UL CoMP | Ericsson, ST-Ericsson | Noted |
R1‑112931 | Potential Enhancements for UL DMRS | Ericsson, ST-Ericsson | Revised |
R1‑112932 | Potential Enhancements for SRS | Ericsson, ST-Ericsson | Revised |
R1‑112933 | 36.213CR0357 (Rel-10, Cat F) Miscellaneous corrections on uplink power control | CATT | Noted - Revised |
R1‑112934 | 36.213CR0358 (Rel-10, Cat F) Corrections on N_c^{received} | CATT | Agreed |
R1‑112935 | 36.213CR0359 (Rel-10, Cat F) Corrections on TDD PUCCH format 1b with channel selection and two configured serving cells | CATT | Agreed |
R1‑112936 | 36.213CR0360 (Rel-10, Cat F) Corrections on the notation of k and k_m | CATT | Agreed |
R1‑112937 | Enhancements on UL ACK/NACK in Rel-11 carrier aggregation | CATT | Noted |
R1‑112938 | Enhancement for CSI transmission in LTE-A Rel-11 with CA | CATT | Noted |
R1‑112939 | Impact on downlink performance with Rel-10 CA CSI mechanisms | CATT | Noted |
R1‑112940 | Transmit diversity for PUCCH Format 1b with channel selection | CATT | Noted |
R1‑112941 | On the necessity and methodology for PUCCH format 3 overhead analysis | CATT | Noted |
R1‑112942 | Transmit diversity for PUCCH Format 3 | CATT | Revised |
R1‑112943 | Motivation of TDD inter-band carrier aggregation with different TDD UL-DL configurations | CATT | Noted |
R1‑112944 | Design of TDD Inter-band Carrier Aggregation | CATT | Not treated |
R1‑112945 | Additional carrier types for Rel-11 | CATT | Not treated |
R1‑112946 | Support of multiple timing advances in LTE-A Rel-11 with CA | CATT | Not treated |
R1‑112947 | Considerations on codebook enhancements for DL MIMO | CATT | Noted |
R1‑112948 | Overall discussion on CSI feedback enhancements for DL MIMO | CATT | Noted |
R1‑112949 | CSI feedback for geographically-separated antennas | CATT | Noted |
R1‑112950 | Evaluation of 4Tx codebook enhancement for DL MIMO | CATT | Noted |
R1‑112951 | Discussion on time alignment error | CATT | Noted |
R1‑112952 | Further discussion on rank adaptation | CATT | Noted |
R1‑112953 | Views on control signalling enhancements for Rel-11 DL-MIMO | CATT | Noted |
R1‑112954 | Enhancements of downlink control signaling in Rel-11 | CATT | Noted |
R1‑112955 | Considerations on DL CoMP schemes | CATT | Noted |
R1‑112956 | CQI feedback for CoMP | CATT | Not treated |
R1‑112957 | Discussion on feedback mechanisms for CoMP | CATT | Not treated |
R1‑112958 | Considerations on CSI feedback for CoMP in TDD | CATT | Not treated |
R1‑112959 | Considerations on reference signal for interference measurement | CATT | Not treated |
R1‑112960 | DL reference signal enhancement for CoMP transmission | CATT | Noted |
R1‑112961 | On downlink control signaling of CoMP | CATT | Noted |
R1‑112962 | Standardization impact of UL CoMP | CATT | Noted |
R1‑112963 | Considerations on UL RS enhancement for CoMP transmission | CATT | Not treated |
R1‑112964 | Uplink power control discussions for CoMP | CATT | Not treated |
R1‑112965 | Design of low-cost MTC UEs in Rel-11 | CATT | Not treated |
R1‑112966 | CQI reports in frequency band specific compressed mode | Huawei, HiSilicon | Noted |
R1‑112967 | Clarification of CQI reports in frequency band specific compressed mode | Huawei, HiSilicon | Not treated |
R1‑112968 | HS-SCCH Orders for UL CLTD Configurations (de-)Activation | Huawei, HiSilicon | Noted |
R1‑112969 | Use of remaining 2 bits in a slot of S-DPCCH | Huawei,HiSilicon | Noted |
R1‑112970 | Further considerations on F-PCICH channel design | Huawei, HiSilicon | Noted |
R1‑112971 | Handling of low reception quality of F-PCICH | Huawei,HiSilicon | Noted |
R1‑112972 | CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112973 | CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112974 | CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112975 | CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112976 | CR for 25.215: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑112977 | Analysis on DTX codeword in case of 8C-HSDPA | Huawei,HiSilicon | Noted |
R1‑112978 | Pilot design for DL 4-branch MIMO | Huawei,HiSilicon | Noted |
R1‑112979 | Discussion on four-branch MIMO design options | Huawei,HiSilicon | Noted |
R1‑112980 | Further considerations on stand-alone HS-DPCCH in CELL_FACH | Huawei, HiSilicon | Noted |
R1‑112981 | On TTI alignment between CELL_FACH UEs and CELL_DCH Ues | Huawei, HiSilicon | Noted |
R1‑112982 | Signalling based interference control and time reduction of uplink initial access in CELL_FACH | Huawei, HiSilicon | Noted |
R1‑112983 | Considerations on Uplink for Introducing Multiflow Data Transmission | Huawei, HiSilicon | Not treated |
R1‑112984 | Considerations on Downlink for Introducing Multiflow Data Transmission | Huawei, HiSilicon | Not treated |
R1‑112985 | Motivation for inter-band aggregated CCs with different TDD UL-DL configurations | New Postcom | Noted |
R1‑112986 | Downlink control signaling enhancements | New Postcom | Revised |
R1‑112987 | High-level view on DL CoMP schemes | New Postcom | Noted |
R1‑112988 | CSI feedback for DL CoMP and MIMO | New Postcom | Noted |
R1‑112989 | Discussions on transmission based solutions for control channel in ICIC | New Postcom | Not treated |
R1‑112990 | Performance evaluation of selected scenarios in ICIC | New Postcom | Not treated |
R1‑112991 | Enhanced interference measurement for CoMP | New Postcom | Not treated |
R1‑112992 | Discussion on gain factor of SB on UL DPCH | TD Tech | Noted |
R1‑112993 | Benefits of Using Different TDD UL-DL Configurations on Different Bands in Carrier Aggregation | HTC | Withdrawn |
R1‑112994 | Discussion on Additional Carrier Types in Carrier Aggregation for Release 11 | HTC, CHTTL | Not treated |
R1‑112995 | Scenarios for UE Performance Requirements under Macro-Femto Deployments | HTC | Revised |
R1‑112996 | Possible Approaches and Impacts of Low-Cost MTC UEs based on LTE | HTC | Revised |
R1‑112997 | Analysis of reducing the cost of LTE devices for MTC | ZTE | Not treated |
R1‑112998 | Draft CR to 36.211 Correction to figure of CSI-RS pattern in extended-CP subframe | ZTE | Noted - Revised |
R1‑112999 | Draft 36.213 CR on SRS transmission comb | ZTE | Noted - Revised |
R1‑113000 | On support of inter-band CA with different TDD UL-DL configurations | ZTE | Noted |
R1‑113001 | Consideration for uplink power control in UL CoMP | ZTE | Not treated |
R1‑113002 | Consideration on non-zero Ks value in UL MIMO system | ZTE | Withdrawn |
R1‑113003 | Discussion on additional carrier types for LTE Rel-11 | ZTE | Not treated |
R1‑113004 | Discussion on PDCCH with reduced overhead in Rel-11 | ZTE | Not treated |
R1‑113005 | Analysis of a new PDCCH procedure for CA enhancement | ZTE | Not treated |
R1‑113006 | Consideration on Uplink signaling enhancement in Rel-11 Carrier aggregation | ZTE | Noted |
R1‑113007 | Views on specifying CoMP support in Rel-11 | ZTE | Noted |
R1‑113008 | Discussion on CSI feedback for CoMP based on carrier aggregation feedback structure | ZTE | Not treated |
R1‑113009 | CQI computation for CoMP | ZTE | Not treated |
R1‑113010 | Consideration on Feedback Enhancements in DL-MIMO Scenarios A and C | ZTE | Noted |
R1‑113011 | Discussion on interference measurement for CSI feedback | ZTE | Noted |
R1‑113012 | Aspects on geographically-separated antennas | ZTE | Noted |
R1‑113013 | Evaluation on impact of timing error between CoMP transmission points | ZTE | Noted |
R1‑113014 | Evaluation on necessity of DMRS enhancement under CoMP scenarios | ZTE | Noted |
R1‑113015 | Consideration on downlink control signaling configuration for CoMP | ZTE | Noted |
R1‑113016 | Standardization impact of UL CoMP | ZTE | Noted |
R1‑113017 | Uplink Reference Signal Enhancement for CoMP | ZTE | Not treated |
R1‑113018 | Discussion on CSI feedback granularity in real-life DL MIMO deployments with timing misalignment | ZTE | Revised |
R1‑113019 | Impact of inter-point antenna calibration error on CoMP performance with channel reciprocity in TDD system | ZTE | Revised |
R1‑113020 | Discussion on downlink control signaling enhancement | ZTE | Noted |
R1‑113021 | Considerations on the enhancement for Partial Reciprocity in TDD | ZTE | Not treated |
R1‑113022 | Performance Evaluation of Heterogeneous Networks | ZTE | Not treated |
R1‑113023 | Consideration on extension carrier in Rel-11 | Potevio | Not treated |
R1‑113024 | Consideration on simultaneous tx/rx on different bands with different UL-DL configurations | Potevio | Noted |
R1‑113025 | The impact of half-duplex on different bands with different TDD UL-DL configurations | Potevio | Not treated |
R1‑113026 | Evaluation of dominant interferers for further enhanced ICIC | Potevio | Not treated |
R1‑113027 | Evaluation of performance improvement on CRE with ABS solution for further enhanced ICIC | Potevio | Not treated |
R1‑113028 | Discussion of the candidate solutions of ABS interference management | Potevio | Not treated |
R1‑113029 | Downlink control channel enhancement for Rel-11 | Potevio | Noted |
R1‑113030 | Considerations on enhanced downlink control channel design | Potevio | Not treated |
R1‑113031 | Considerations on uplink sounding enhancements | Potevio | Not treated |
R1‑113032 | Investigation on e-PDCCH using MU-MIMO | Potevio | Not treated |
R1‑113033 | Discussion on DL MIMO CSI enhancement for single point | Potevio | Not treated |
R1‑113034 | Discussion on DL MIMO CSI enhancement for multiple points | Potevio | Noted |
R1‑113035 | Considerations on RRH subset selection mechanism | Potevio | Not treated |
R1‑113036 | Issues on TDD inter-band CA with different UL-DL configuration^^ | New Postcom^^ | Noted |
R1‑113037 | Uplink control signalling enhancement for CA^^ | New Postcom^^ | Not treated |
R1‑113038 | PDCCH bundling analysis for downlink control signalling enhancement^^ | New Postcom^^ | Not treated |
R1‑113039 | Common Search Space for RACH on Scell | New Postcom^^ | Not treated |
R1‑113040 | Inter-band CA with different UL-DL configuration in TDD | New Postcom^^ | Not treated |
R1‑113041 | High-level overview of standardization impact of Uplink CoMP^^ | New Postcom^^ | Noted |
R1‑113042 | RACH enhacement for uplink CoMP^^ | New Postcom^^ | Not treated |
R1‑113043 | Uplink reference signals for uplink CoMP^^ | New Postcom^^ | Not treated |
R1‑113044 | Uplink power control for uplink CoMP | New Postcom^^ | Not treated |
R1‑113045 | Discussion on The Necessity of Additional Carrier Types | MediaTek | Noted |
R1‑113046 | Discussion on Application Scenarios for Inter-band Aggregation of CCs with Different TDD UL-DL Configurations | MediaTek | Noted |
R1‑113047 | HARQ Feedback Mechanism in CA with Different TDD Configurations | MediaTek | Not treated |
R1‑113048 | Cross-carrier scheduling on different TDD configurations | MediaTek | Not treated |
R1‑113049 | Consideration on a transmit-side solution with subframe shifting | MediaTek | Not treated |
R1‑113050 | Discussion on Priority of DL CoMP Schemes | MediaTek | Noted |
R1‑113051 | Point Selection and CSI Feedback for CoMP Operation | MediaTek | Not treated |
R1‑113052 | Specification Impact for the Support of UL CoMP | MediaTek | Noted |
R1‑113053 | Discussion on Signaling Methods for UE-Specific PDCCH | MediaTek | Noted |
R1‑113054 | Aspects of Potential Cost Saving for LTE MTC Devices and System Impact Discussion | MediaTek | Not treated |
R1‑113055 | Reply to RAN2 LS on Network based positioning support | MediaTek | Not treated |
R1‑113056 | UL CLTD Beamforming Implementation | ZTE | Noted |
R1‑113057 | Design considerations for stand-alone HS-DPCCH in CELL_FACH | ZTE | Noted |
R1‑113058 | TTI alignment between CELL_FACH UEs and CELL_DCH Ues | ZTE | Noted |
R1‑113059 | HS-DPCCH timing analysis for MF-HSDPA | ZTE | Not treated |
R1‑113060 | 25872 CR0001 (Rel-11,F) Uncompressed HS-DPCCH timeline for MP-HSDPA | ZTE | Not treated |
R1‑113061 | Summary of the email discussion on real-life rank reporting issue | Orange (rapporteur) | Noted |
R1‑113062 | Performance Evaluation in Heterogeneous Networks considering CRS interference | Hitachi, Ltd. | Noted |
R1‑113063 | Considerations on Downlink CoMP Schemes in Release 11 | Hitachi, Ltd. | Noted |
R1‑113064 | Further Considerations on Scenario3 | Hitachi, Ltd. | Not treated |
R1‑113065 | System Design Considerations for CoMP and eICIC | Hitachi, Ltd. | Not treated |
R1‑113066 | Downlink control signaling for downlink CoMP | ETRI | Revised |
R1‑113067 | Discussion on enhanced PDCCH in Rel-11 | ETRI | Not treated |
R1‑113068 | High-level views on downlink CoMP schemes | ETRI | Noted |
R1‑113069 | 36.213 CR0361 (Rel-10, F) Corrections on PUCCH mode 2-1 | Samsung, ZTE, LG Electronics, Motorola Mobility | Noted - Revised |
R1‑113070 | Draft CR TS36.213 (Rel-10, F) Alignment of Notation between TS36.211v10.3.0 and TS36.213v10.3.0 | Samsung | Noted - Revised |
R1‑113071 | Draft CR TS36.213 (Rel-10, F) Correction on Determining n_HARQ for Uplink Power Control | Samsung | Withdrawn |
R1‑113072 | Enhancing PDCCH Capacity for CA through Compact DCI Formats | Samsung | Not treated |
R1‑113073 | HARQ-ACK Bundling for PUCCH Format 3 | Samsung | Noted |
R1‑113074 | HARQ-ACK and CSI Multiplexing in PUCCH for DL CA | Samsung | Not treated |
R1‑113075 | HARQ-ACK Multiplexing in PUSCH for DL CA | Samsung | Noted |
R1‑113076 | Multi-Cell Periodic CSI Reporting for DL CA | Samsung | Noted |
R1‑113077 | Transmit diversity for PUCCH format 1b with channel selection | Samsung | Noted |
R1‑113078 | Analysis of PUCCH Format 3 transmit diversity schemes for Rel-11 | Samsung | Noted |
R1‑113079 | Views on open questions for CA with different TDD UL-DL configurations | Samsung | Noted |
R1‑113080 | Full vs. half duplex for CA with different TDD UL-DL configurations | Samsung | Withdrawn |
R1‑113081 | DL/UL HARQ-ACK transmission in CA with different TDD UL-DL configurations | Samsung | Not treated |
R1‑113082 | Data scheduling in CA with different TDD UL-DL configurations | Samsung | Not treated |
R1‑113083 | Additional Carrier Types for Rel.11 | Samsung | Not treated |
R1‑113084 | Discussion on interference cancellation for enhanced non-CA-based ICIC | Samsung | Not treated |
R1‑113085 | PDSCH performance evaluation for FeICIC | Samsung | Revised |
R1‑113086 | High level discussions on downlink CoMP schemes | Samsung | Noted |
R1‑113087 | Discussion on multi-point CSI feedback for downlink CoMP | Samsung | Revised |
R1‑113088 | Discussions on CSI feedback enhancement for homogeneous macro network | Samsung | Revised |
R1‑113089 | Discussions on CSI feedback enhancement for outdoor low-power Tx points | Samsung | Revised |
R1‑113090 | Downlink RS enhancement for downlink CoMP | Samsung | Noted |
R1‑113091 | Interference measurement for downlink CoMP | Samsung | Not treated |
R1‑113092 | Discussions on TP associations for CoMP | Samsung | Noted |
R1‑113093 | Standardization impact of UL CoMP | Samsung | Noted |
R1‑113094 | UL DMRS enhancements for UL CoMP | Samsung | Not treated |
R1‑113095 | SRS enhancements for CoMP | Samsung | Not treated |
R1‑113096 | Discussions on UL Power Control for UL CoMP | Samsung | Not treated |
R1‑113097 | SRS Transmission Power Control for CoMP | Samsung | Not treated |
R1‑113098 | UL Control Signaling for CoMP | Samsung | Not treated |
R1‑113099 | Timing advance for UL CoMP | Samsung | Not treated |
R1‑113100 | DL Control Signaling Enhancements | Samsung | Not treated |
R1‑113101 | Low-Cost MTC UEs based on LTE | Samsung | Not treated |
R1‑113102 | Discussion on support of simultaneous transmission and reception for inter-band CA with different TDD configuration | Pantech | Not treated |
R1‑113103 | Discussion on HARQ timing for inter-band CA with different TDD configuration | Pantech | Not treated |
R1‑113104 | Views on additional carrier types for CA in Rel-11 | Pantech | Not treated |
R1‑113105 | Discussion on ePHICH to support UL HARQ process | Pantech | Not treated |
R1‑113106 | Discussion on CSI-RS configuration for Rel-11 | Pantech | Not treated |
R1‑113107 | Joint muting information in DL signaling for coherent JT CoMP | Pantech | Not treated |
R1‑113108 | PHICH resource management for downlink CoMP scenario 4 | Pantech | Not treated |
R1‑113109 | Discussion on UL DM-RS enhancements for UL CoMP in Rel-11 | Pantech | Not treated |
R1‑113110 | Aperiodic sounding in Rel-11 | Pantech | Not treated |
R1‑113111 | Uplink power control enhancement in new deployment scenarios | Pantech | Not treated |
R1‑113112 | Power control scheme to support UL CoMP in heterogeneous network | Pantech | Withdrawn |
R1‑113113 | On the reduction of baseband complexity for low cost MTC | Pantech | Not treated |
R1‑113114 | LS on Release 11 Features | SA, Samsung | Noted |
R1‑113115 | Uplink signalling for carrier aggregation enhancement | Panasonic | Noted |
R1‑113116 | Consideration of approaches to the support of TDD different UL-DL configuration on different bands | Panasonic | Noted |
R1‑113117 | Extension carrier for Rel.11 | Panasonic | Not treated |
R1‑113118 | Performance Evaluation of Cell Range Expansion in Combination with ABS Ratio Optimization | Panasonic | Not treated |
R1‑113119 | High Level Proposal on DL CoMP Schemes | Panasonic | Noted |
R1‑113120 | CSI Feedback in support of DL CoMP | Panasonic | Not treated |
R1‑113121 | Operation of Traffic Offloading in RRH-based Heterogeneous Network and Possible Spec Impact | Panasonic | Not treated |
R1‑113122 | Single-point CSI Feedback Enhancements in Rel-11 | Panasonic | Noted |
R1‑113123 | CSI-RS based measurement for CoMP | Panasonic | Noted |
R1‑113124 | Flexible CoMP Operation based on Dedicated CSI-RS Configuration | Panasonic | Noted |
R1‑113125 | Comparison between CoMP Scenario 3 and 4 | Panasonic | Not treated |
R1‑113126 | Potential standardization impact for uplik CoMP | Panasonic | Noted |
R1‑113127 | CoMP uplink timing advance | Panasonic | Not treated |
R1‑113128 | Discussion on the Selection of Reception Points for UL CoMP | Panasonic | Not treated |
R1‑113129 | UL CoMP evaluation results for scenario 3 | Panasonic | Not treated |
R1‑113130 | Considerations on Enhanced PDCCH | Panasonic | Noted |
R1‑113131 | Summary of email discussion on downlink control signalling enhancements for CA | Nokia | Noted |
R1‑113132 | CSI signalling enhancements for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑113133 | PUCCH multiplexing combinations for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑113134 | On the PUCCH Transmission Diversity for PUCCH Format 1B with Channel Selection | Nokia Siemens Networks, Nokia | Noted |
R1‑113135 | On the PUCCH Transmission Diversity for PUCCH Format 3 | Nokia Siemens Networks, Nokia | Noted |
R1‑113136 | Views on inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Noted |
R1‑113137 | Considerations on additional carrier types | Nokia, Nokia Siemens Networks | Noted |
R1‑113138 | Further-eICIC Performance with CRS interference cancellation | Nokia Siemens Networks, Nokia | Noted |
R1‑113139 | Considerations on tx based enhancements for Rel'11 | Nokia Siemens Networks, Nokia | Noted |
R1‑113140 | Further considerations on potential for uplink capacity enhancement when applying TDM eICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑113141 | CoMP schemes for R11 | Nokia Siemens Networks | Noted |
R1‑113142 | Intra- and inter-cell CoMP | Nokia | Noted |
R1‑113143 | UE feedback enhancements for intra- and inter-cell CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑113144 | On Rel.11 Single-Point CSI Feedback Enhancements | Nokia, Nokia Siemens Networks | Noted |
R1‑113145 | Cell aggregation concept | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑113146 | Downlink reference signal for CoMP operation | Nokia Siemens Networks, Nokia | Noted |
R1‑113147 | Downlink control enhancements for intra- and inter-cell CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑113148 | On UL CoMP Standardization Impact | Nokia Siemens Networks, Nokia | Noted |
R1‑113149 | Rel10 DM RS limitations for UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑113150 | Uplink power control with UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑113151 | On the PUCCH Enhancements for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑113152 | Channel Estimation Modelling for Uplink in System Level Simulation | Nokia Siemens Networks, Nokia | Not treated |
R1‑113153 | Discussion of Time Misalignment and Antenna Array Calibration | Nokia Siemens Networks, Nokia | Noted |
R1‑113154 | On DL MIMO Rank Reporting | Nokia, Nokia Siemens Networks | Not treated |
R1‑113155 | Motivations and scenarios for ePDCCH | Nokia, Nokia Siemens Networks | Noted |
R1‑113156 | Considerations on which gain mechanisms to evaluate when considering E-PDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑113157 | Summary of email discussion on enhanced PDCCH | Nokia | Noted |
R1‑113158 | On Standards Aspects with Significant UE Cost Impact | Nokia, Nokia Siemens Networks | Not treated |
R1‑113159 | Discussion on the remaining details of UL CL Tx diversity | Renesas Mobile Europe Ltd. | Noted |
R1‑113160 | CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Renesas Mobile Europe Ltd. | Noted |
R1‑113161 | CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Renesas Mobile Europe Ltd. | Noted |
R1‑113162 | High Level Views on the Four Branch MIMO Transmission for HSDPA | Renesas Mobile Europe Ltd. | Noted |
R1‑113163 | Standalone HS-DPCCH considerations | Renesas Mobile Europe Ltd. | Noted |
R1‑113164 | Uplink interference control for enhanced CELL_FACH | Renesas Mobile Europe Ltd. | Noted |
R1‑113165 | Motivation of CC Specific TDD Configuration | Renesas Mobile Europe Ltd. | Not treated |
R1‑113166 | Cross Carrier Scheduling Scenarios for CC Specific TDD Configuration | Renesas Mobile Europe Ltd. | Not treated |
R1‑113167 | Open Issues for CC Specific TDD Configuration | Renesas Mobile Europe Ltd. | Noted |
R1‑113168 | Initial Discussions on New Carrier Types for LTE Rel-11 | Renesas Mobile Europe Ltd. | Noted |
R1‑113169 | Further simulation results on eICIC | Renesas Mobile Europe Ltd. | Withdrawn |
R1‑113170 | Views on CoMP schemes for Release 11 specification | Renesas Mobile Europe Ltd. | Noted |
R1‑113171 | On CSI feedback for multi-point transmission | Renesas Mobile Europe Ltd. | Noted |
R1‑113172 | Single point CSI feedback for DL MIMO enhancements | Renesas Mobile Europe Ltd. | Noted |
R1‑113173 | Interference estimation aspects in Release 11 | Renesas Mobile Europe Ltd. | Not treated |
R1‑113174 | E-PDCCH design aspects | Renesas Mobile Europe Ltd. | Noted |
R1‑113175 | Link-level evaluation of E-PDCCH design aspects | Renesas Mobile Europe Ltd. | Noted |
R1‑113176 | Enhancements for uplink CoMP in Release 11 | Renesas Mobile Europe Ltd. | Noted |
R1‑113177 | Uplink power control in non-uniform network | Renesas Mobile Europe Ltd. | Not treated |
R1‑113178 | Real-life measurements on rank adaptation | Renesas Mobile Europe Ltd. | Noted |
R1‑113179 | Views on motivations and targets for control signaling enhancements | Renesas Mobile Europe Ltd. | Noted |
R1‑113180 | Standards aspects of Low-Cost MTC LTE UEs | Renesas Mobile Europe Ltd. | Not treated |
R1‑113181 | Correction on HARQ-ACK procedure | LG Electronics | Noted - Revised |
R1‑113182 | Enhancement for CSI Transmission in LTE-A Rel-11 | LG Electronics | Not treated |
R1‑113183 | Transmit Diversity Schemes on Channel Selection for Rel-11 | LG Electronics | Noted |
R1‑113184 | Transmit Diversity Schemes on PUCCH Format 3 for Rel-11 | LG Electronics | Noted |
R1‑113185 | Discussion on Different TDD UL/DL Configurations for Inter-band CA | LG Electronics | Not treated |
R1‑113186 | Additional Carrier Type for Rel-11 | LG Electronics | Noted |
R1‑113187 | Discussion on Simultaneous Uplink Channel Transmission in Rel-11 | LG Electronics | Not treated |
R1‑113188 | Consideration on MIMO feedback enhancement in Rel-11 | LG Electronics | Noted |
R1‑113189 | Enhancement of 4Tx feedback codebook and MU-MIMO feedback | LG Electronics | Revised |
R1‑113190 | Consideration on interference measurement for CSI feedback | LG Electronics | Noted |
R1‑113191 | Investigation on the impact of timing misalignment/antenna calibration | LG Electronics | Noted |
R1‑113192 | On the necessity of an enhanced PDCCH in Rel-11 | LG Electronics | Noted |
R1‑113193 | Design aspects for enhanced PDCCH transmission | LG Electronics | Not treated |
R1‑113194 | Consideration on transmit diversity scheme for enhanced PDCCH transmission | LG Electronics | Noted |
R1‑113195 | Performance evaluation of multiplexing schemes for enhanced PDCCH transmission | LG Electronics | Noted |
R1‑113196 | Consideration on common search space configuration for Rel-11 UEs | LG Electronics | Noted |
R1‑113197 | Discussion on DL/UL control channel for HARQ with enhanced PDCCH | LG Electronics | Not treated |
R1‑113198 | Consideration on UE cost impact for LTE physical layer standards | LG Electronics | Not treated |
R1‑113199 | FeICIC performance with CRS interference | Intel Corporation | Revised |
R1‑113200 | 4Tx codebook enhancement in prioritized scenarios | Intel Corporation | Noted |
R1‑113201 | CSI feedback for dynamic SU/MU adaptation | Intel Corporation | Not treated |
R1‑113202 | Performance analysis of enhanced downlink control signalling | Intel Corporation | Noted |
R1‑113203 | Analysis of Geographically Isolated Antenna | Intel Corporation | Not treated |
R1‑113204 | Study on Provision of Low-Cost MTC UEs based on LTE | Intel Corporation | Not treated |
R1‑113205 | Discussion of Uplink Power Control in Heterogeneous Networks | Intel Corporation | Not treated |
R1‑113206 | On New Carrier Types: Extension Carriers and Carrier Segments | Intel Corporation | Noted |
R1‑113207 | High-level views on DL CoMP schemes in Release 11 | Intel Corporation | Noted |
R1‑113208 | Views on standardization impact of UL CoMP | Intel Corporation | Noted |
R1‑113209 | Discussion on Different UL-DL Configurations for LTE-TDD Inter-band Carrier Aggregation | Intel Corporation | Not treated |
R1‑113210 | 36.212 CR0130 (Rel-10, F) Corrections on codebook index indication in DCI format 4 | Huawei, HiSilicon | Noted - Revised |
R1‑113211 | PDCCH enhancement in carrier aggregation | Huawei, HiSilicon | Not treated |
R1‑113212 | Transmit Diversity for PUCCH Format 3 | Huawei, HiSilicon | Noted |
R1‑113213 | Comparison of solutions for FeICIC of PBCH/PSS/SSS and Paging/SIB1 | Huawei, Hisilicon | Not treated |
R1‑113214 | Design and performance evaluation of coodinated beamforming | Huawei, HiSilicon | Not treated |
R1‑113215 | Uplink Control Access and Transmission | Huawei, HiSilicon | Not treated |
R1‑113216 | Uplink timing advance for CoMP | Huawei, HiSilicon | Not treated |
R1‑113217 | Further discussion on rank reporting issue | Huawei | Noted |
R1‑113218 | Link-Level Performance when multiplexing AN and CSI using PUCHC F3 | InterDigital Communications, LLC | Noted |
R1‑113219 | Performance evaluation results for FeICIC scenario identification | InterDigital Communications, LLC | Not treated |
R1‑113220 | Downlink CoMP schemes | InterDigital Communications, LLC | Noted |
R1‑113221 | Performance evaluation of DPS with multi-point CSI feedback schemes | InterDigital Communications, LLC | Not treated |
R1‑113222 | Standardization impact of Uplink CoMP | InterDigital Communications, LLC | Noted |
R1‑113223 | Discussion on Enhanced Downlink Control Channel Design | InterDigital Communications, LLC | Not treated |
R1‑113224 | On Interference Measurement Accuracy in Rel-11 | InterDigital Communications, LLC | Not treated |
R1‑113225 | Standardization aspects for low-cost MTC devices in LTE | InterDigital Communications, LLC | Not treated |
R1‑113226 | Additional Carrier Types: Extension carrier | NEC Group | Not treated |
R1‑113227 | Framework to define additional carrier type: Carrier segments | NEC Group | Not treated |
R1‑113228 | DL Control channel enhancements with carrier aggregation | NEC Group | Not treated |
R1‑113229 | Further performance results of Cell Range Extension with eICIC | NEC Group | Revised |
R1‑113230 | Views on CRE evaluation | NEC group | Not treated |
R1‑113231 | Enhancements to DL MU-MIMO CSI Feedback | NEC Group | Revised |
R1‑113232 | Impact of CRE Bias to PCFICH Detection and Potential Tx-based solutions | Research In Motion UK Limited | Not treated |
R1‑113233 | Further Evaluation on Transmit Diversity for Channel Selection | Research In Motion UK Limited | Revised |
R1‑113234 | CSI feedback to Support DL CoMP and MIMO Enhancement | Research In Motion UK Limited | Not treated |
R1‑113235 | Further Discussion on PRACH Enhancement for CoMP Scenario 4 | Research In Motion UK Limited | Not treated |
R1‑113236 | Design Consideration for E-PDCCH | Research In Motion UK Limited | Noted |
R1‑113237 | High Level View on CoMP Transmission Scheme | Research In Motion UK Limited | Noted |
R1‑113238 | E-PDCCH Transmission with Transmit Diversity | Research In Motion UK Limited | Noted |
R1‑113239 | PUCCH enhancement for large CSI payload in CA | Research In Motion UK Limited | Not treated |
R1‑113240 | Further Discussion on PDCCH Enhancement in CA | Research In Motion UK Limited | Not treated |
R1‑113241 | On proposed enhancements to periodic CSI reporting | Texas Instruments | Noted |
R1‑113242 | Motivation and Considerations for Additional Carrier Types in Rel-11 | Texas Instruments | Not treated |
R1‑113243 | System-Level Performance of Range Extended Het-Nets with Explicit Receiver Modeling | Texas Instruments | Revised |
R1‑113244 | Transmit-side Signalling Enhancements Targeting Het-Nets for Rel-11 | Texas Instruments | Noted |
R1‑113245 | Consideration of specification impact of UL CoMP | Texas Instruments | Noted |
R1‑113246 | UL Power Control for CoMP | Texas Instruments | Not treated |
R1‑113247 | Timing Advance in support of UL CoMP | Texas Instruments | Not treated |
R1‑113248 | Views on DL CoMP standardization in Rel.11 | Texas Instruments | Noted |
R1‑113249 | CSI Feedback for DL CoMP | Texas Instruments | Not treated |
R1‑113250 | On CSI Feedback for single-cell DL MIMO | Texas Instruments | Noted |
R1‑113251 | On downlink reference signals configuration for DL CoMP | Texas Instruments | Noted |
R1‑113252 | Control signaling in support of DL CoMP | Texas Instruments | Noted |
R1‑113253 | Aspects of DL control signaling enhancements in Rel.11 | Texas Instruments | Not treated |
R1‑113254 | Tx based Solutions for Evaluation | Motorola Mobility | Not treated |
R1‑113255 | Prioritization of CoMP Schemes for Release-11 | Motorola Mobility | Noted |
R1‑113256 | Multi-point Feedback Enhancements for Scenarios 3/4 | Motorola Mobility | Not treated |
R1‑113257 | Single-point Feedback Enhancements for Small Cell Deployments | Motorola Mobility | Not treated |
R1‑113258 | Interference Measurements based on CSI-RS | Motorola Mobility | Not treated |
R1‑113259 | Downlink Reference Symbols Configuration for Release-11 | Motorola Mobility | Noted |
R1‑113260 | Additional carrier types for LTE Rel-11 | Motorola Mobility | Not treated |
R1‑113261 | Enhanced control channels for LTE Rel-11 | Motorola Mobility | Noted |
R1‑113262 | PDCCH Capacity Results and Simulation assumptions | Motorola Mobility | Withdrawn |
R1‑113263 | Views on UL CoMP Enhancements and Standardization Impact | Motorola Mobility | Noted |
R1‑113264 | Clarification on the number of ACK/NACK bits on PUSCH when M=1 in TDD | LG Electronics | Noted |
R1‑113265 | Correction for A/N on PUSCH with W=1,2 in case of TDD channel selection | LG Electronics | Noted - Revised |
R1‑113266 | Downlink control signaling enhancements in Rel-11 | LG Electronics | Not treated |
R1‑113267 | Simultaneous transmission of CSI and ACK/NACK on PUCCH format 3 | LG Electronics | Not treated |
R1‑113268 | Individual ACK/NACK support in TDD UL ACK/NACK mode 1 | LG Electronics | Noted |
R1‑113269 | RAN1 issues on multiple TA | LG Electronics | Not treated |
R1‑113270 | Performance Evaluation for FeICIC | LG Electronics | Revised |
R1‑113271 | Tx-based solutions for CRS interference handling | LG Electronics | Revised |
R1‑113272 | Considerations on PBCH and PSS/SSS for FeICIC | LG Electronics | Noted |
R1‑113273 | Enhancement to Time-domain Resource Partitioning | LG Electronics | Not treated |
R1‑113274 | High-level View on DL CoMP | LG Electronics | Noted |
R1‑113275 | Consideration on CoMP CSI Feedback | LG Electronics | Not treated |
R1‑113276 | CQI calculation for CoMP | LG Electronics | Not treated |
R1‑113277 | Considerations on the Specification Impact of CoMP Regarding DL Reference Signals | LG Electronics | Not treated |
R1‑113278 | Downlink control signalling to support CoMP | LG Electronics | Noted |
R1‑113279 | High-level View on UL CoMP | LG Electronics | Noted |
R1‑113280 | Uplink reference signals for CoMP | LG Electronics | Revised |
R1‑113281 | Uplink power control for CoMP | LG Electronics | Revised |
R1‑113282 | Uplink control signals for CoMP | LG Electronics | Revised |
R1‑113283 | Multiple TA in UL CoMP | LG Electronics | Not treated |
R1‑113284 | Specification aspects on low-cost MTC | LG Electronics | Not treated |
R1‑113285 | Consideration on CSI feedback for CoMP | China Telecom, ZTE | Not treated |
R1‑113286 | Clarification of UE behavior for DCI format 3/3A in Rel-10 | NTT DOCOMO | Noted |
R1‑113287 | Views on the scenario for DL control signaling enhancement in Rel-11 | NTT DOCOMO | Not treated |
R1‑113288 | Views on UL signaling enhancement for Rel-11 | NTT DOCOMO | Not treated |
R1‑113289 | On the need for additional carrier types in Rel-11 CA | NTT DOCOMO | Noted |
R1‑113290 | Investigation on performance improvement by CRE considering CRS interference | NTT DOCOMO | Not treated |
R1‑113291 | DL CoMP scheme in Rel-11 | NTT DOCOMO | Noted |
R1‑113292 | CSI feedback scheme for JT CoMP | NTT DOCOMO | Noted |
R1‑113293 | Capacity enhancement of DL MU-MIMO with increased feedback bits for small cells scenario | NTT DOCOMO | Noted |
R1‑113294 | On the need for CSI feedback enhancement for single point and multiple point transmission in Rel-11 | NTT DOCOMO | Noted |
R1‑113295 | RRM measurement set management for Rel-11 CoMP | NTT DOCOMO | Not treated |
R1‑113296 | Views on UL power control issues in HetNet scenario | NTT DOCOMO | Not treated |
R1‑113297 | Enhanced PDCCH for DL MIMO in Rel-11 | NTT DOCOMO | Noted |
R1‑113298 | Clarification on Serving Grant to E-TFCI mapping | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑113299 | On the PCI symbols allocation in F-PCICH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113300 | On the timing of HS-SCCH order to activate/deactivate CLTD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113301 | On the spare info bits in S-DPCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113302 | UE Request to Activate/Deactivate CLTD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113303 | On the pilot design for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑113304 | On the codeword to layer mapping for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113305 | Standalone HS-DPCCH in CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113306 | Inter-cell Interference Control in CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113307 | Reduction in initial PRACH access timing | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113308 | Feedback of served data rates in MP HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑113309 | Further discussions on DCI overhead reduction for CA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑113310 | On Periodic CSI Report for Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113311 | Evaluation of transmit diversity schemes for PUCCH format 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113312 | Motivation analysis of Inter-band Carrier aggregation with different TDD UL-DL configurations | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113313 | Specification impact of Inter-band Carrier aggregation with different TDD UL-DL configurations | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113314 | Multiple Timing Advances for Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑113315 | Discussions on Additional Carrier Types in LTE Rel 11 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113316 | Performance Evaluation of Different Rx/Tx Methods for Rel-11 feICIC | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Withdrawn |
R1‑113317 | On the Downlink CoMP Scheme | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑113318 | Multipoint CSI Feedback | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113319 | CSI feedback for x-pol antenna configurations | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113320 | Downlink Reference Signal Requirements in support of CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113321 | PDCCH capacity analysis and design principles for enhanced PDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113322 | Design details for enhanced PDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113323 | Overview of standardisation impact of UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113324 | On the need for UL DM-RS enhancements for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | Not treated |
R1‑113325 | On the need for SRS enhancements for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | Not treated |
R1‑113326 | PUSCH power control for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑113327 | PUCCH power control for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑113328 | SRS power control for UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | Not treated |
R1‑113329 | UCI transmission enhancement for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑113330 | Timing Alignment for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑113331 | On the need for RACH enhancement for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | Not treated |
R1‑113332 | TR36.871v0.1.1 Downlink MIMO Enhancement for LTE-Advanced | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑113333 | On handling of timing misalignment and antenna calibration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑113334 | Considerations on potential solutions for low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑113335 | Remaining Design Consideration for PCI Feedback Design | Qualcomm Incorporated | Noted |
R1‑113336 | HS-SCCH orders to signal CLTD Configurations | Qualcomm Incorporated | Not treated |
R1‑113337 | On the use of the two remaining bits in the S-DPCCH Slot Format | Qualcomm Incorporated | Noted |
R1‑113338 | On the Benefits of Enhanced Symmetric Beamforming | Qualcomm Incorporated | Noted |
R1‑113339 | On the need for UE requested (De-)Activation of CLTD | Qualcomm Incorporated | Noted |
R1‑113340 | Merits and the mechanism of Standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑113341 | Impact of interference in Cell_FACH state | Qualcomm Incorporated | Withdrawn |
R1‑113342 | Further analysis on the link efficiency comparison between R99 and EUL in CELL_FACH | Qualcomm Incorporated | Withdrawn |
R1‑113343 | Physical Layer Design aspects of MP-HSPA | Qualcomm Incorporated | Noted |
R1‑113344 | Configuration of Multipoint transmission | Qualcomm Incorporated | Noted |
R1‑113345 | Uplink reporting for inter-band carrier aggregation with different TDD configurations | Sharp | Not treated |
R1‑113346 | Discussions on additional carrier types | Sharp | Not treated |
R1‑113347 | CSI feedback content | Sharp | Not treated |
R1‑113348 | Necessity of Calibration and Baseline Assumption for UL HetNet | Sharp | Not treated |
R1‑113349 | UL RS Enhancements to Support Efficient UL CoMP | Sharp | Not treated |
R1‑113350 | Necessity of TPC enhancements to Solve Asymmetric DL/UL Coverage Issue in HetNet Scenarios | Sharp | Not treated |
R1‑113351 | Motivations and scenarios for enhanced downlink control channel investigation | Sharp | Noted |
R1‑113352 | DL control channel enhancement for DL MIMO in Rel.11 | Sharp | Not treated |
R1‑113353 | Discussions on DL CoMP Schemes | Ericsson, ST-Ericsson | Noted |
R1‑113354 | Hierarchical Feedback for DL CoMP and DL MIMO | Ericsson, ST-Ericsson | Noted |
R1‑113355 | Downlink Reference signals for Enhanced Multiplexing | Ericsson, ST-Ericsson | Noted |
R1‑113356 | CoMP Aspects of the ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑113357 | Addressing Ill-Matched UE Rank Reporting | Ericsson, ST-Ericsson | Noted |
R1‑113358 | Remaining details for UL CLTD | InterDigital Communications, LLC | Noted |
R1‑113359 | UL CLTD synchronization aspects | InterDigital Communications, LLC | Noted |
R1‑113360 | Codeword o layer mapping alternatives for DL 4 branch MIMO | InterDigital Communications, LLC | Noted |
R1‑113361 | Standalone HS-DPCCH in CELL_FACH state | InterDigital Communications, LLC | Noted |
R1‑113362 | Performance Evaluations of TDM-eICIC with Large CRE Bias Value in 3GPP and ITU channel model scenarios | KDDI | Not treated |
R1‑113363 | Observations on CoMP schemes | KDDI | Noted |
R1‑113364 | Throughput Performances of CoMP Scenario 4 considering R-PDCCH-based PDCCH enhancement | KDDI | Noted |
R1‑113365 | PDCCH capacity enhancement for Rel-11 inter-band carrier aggregation | KDDI | Not treated |
R1‑113366 | Downlink CSI feedback enhancement for MU-MIMO | KDDI | Withdrawn |
R1‑113367 | UE testing aspect for CSI feedback enhancement | KDDI | Withdrawn |
R1‑113368 | Clarification on the determination of modulation order for PUSCH retransmission | ITRI | Noted |
R1‑113369 | Clarification on the HARQ-ACK procedure of TDD UL-DL configuration 5 | ITRI | Noted - Revised |
R1‑113370 | Clarification on the determination of resource for PUCCH Format 1b with channel selection in TDD mode | ITRI | Noted - Revised |
R1‑113371 | Discussions on TDD UL-DL configurations for inter-band CA | ITRI | Noted |
R1‑113372 | Consideration on E-PDCCH multiplexing and signalling | LG-Ericsson | Not treated |
R1‑113373 | Draft reply LS on radio metrics with respect to QoE | Qualcomm Inc. | Noted - Revised |
R1‑113374 | Clarification of PUCCH 2-1 operation | Qualcomm Inc. | Noted |
R1‑113375 | CR Clarification of PUCCH 2-1 operation | Qualcomm Inc., Intel Corporation, Panasonic Corporation | Noted - Revised |
R1‑113376 | DL control channel enhancements for CA operation | Qualcomm Inc. | Not treated |
R1‑113377 | UL control channel enhancements for CA operation | Qualcomm Inc. | Not treated |
R1‑113378 | TxD scheme for PUCCH format 1b with channel selection | Qualcomm Inc. | Noted |
R1‑113379 | TxD scheme for PUCCH format 3 | Qualcomm Inc. | Noted |
R1‑113380 | Support of CA for different TDD UL-DL configurations | Qualcomm Inc. | Noted |
R1‑113381 | Support of Cross-carrier control for Carrier Aggregation of Different TDD UL-DL Configurations on Different Bands | Qualcomm Inc. | Noted |
R1‑113382 | Use Cases for Extension Carriers | Qualcomm Inc. | Noted |
R1‑113383 | eICIC evaluations for different handover biases | Qualcomm Inc. | Revised |
R1‑113384 | On transmitter based solutions for eICIC | Qualcomm Inc. | Not treated |
R1‑113385 | High-level proposals on DL-CoMP | Qualcomm Inc. | Noted |
R1‑113386 | Feedback in support of downlink CoMP and MIMO | Qualcomm Inc. | Not treated |
R1‑113387 | Downlink reference signals for CoMP operation | Qualcomm Inc. | Not treated |
R1‑113388 | Downlink control signaling for CoMP | Qualcomm Inc. | Noted |
R1‑113389 | On the standardization impact of UL CoMP operation | Qualcomm Inc. | Noted |
R1‑113390 | Uplink reference signals for CoMP | Qualcomm Inc. | Not treated |
R1‑113391 | Uplink power control issues in CoMP | Qualcomm Inc. | Not treated |
R1‑113392 | Uplink control signaling for CoMP | Qualcomm Inc. | Not treated |
R1‑113393 | Uplink timing advance | Qualcomm Inc. | Not treated |
R1‑113394 | Time misalignment and calibration | Qualcomm Inc. | Noted |
R1‑113395 | Rank reporting issues | Qualcomm Inc. | Not treated |
R1‑113396 | E-PDCCH Requirements | Qualcomm Inc. | Noted |
R1‑113397 | Areas for lower LTE MTC terminal cost | Qualcomm Inc. | Withdrawn |
R1‑113398 | Correction on PUSCH resource mapping for aperiodic SRS | ASUSTeK | Noted - Revised |
R1‑113399 | Consideration on HARQ-ACK and CSI Multiplexing on PUCCH Format 3 | ASUSTeK | Not treated |
R1‑113400 | TDD inter-band CA with different UL-DL configurations | ASUSTeK | Noted |
R1‑113401 | Frequency specific compressed mode | Nokia Siemens Networks, Nokia | Noted |
R1‑113402 | 25.214 CR0658 (Rel-10, B) CQI reporting for frequency specific compressed mode | Nokia Siemens Networks, Nokia | Not treated |
R1‑113403 | Handling of low F-PCICH reception quality | Nokia Siemens Networks, Nokia | Noted |
R1‑113404 | On compatibility of UL CLTD and UL DTX. | Nokia Siemens Networks, Nokia | Not treated |
R1‑113405 | HS-SCCH orders for UL CLTD | Nokia Siemens Networks, Nokia | Noted |
R1‑113406 | Synchronization procedure with UL CLTD | Nokia Siemens Networks, Nokia | Noted |
R1‑113407 | Open issues with UL CLTD CRs | Nokia Siemens Networks, Nokia | Noted |
R1‑113408 | Summary of the of the uplink closed loop transmit diversity performance results | Nokia Siemens Networks, Nokia | Noted |
R1‑113409 | 25.863 CRdraft (Rel-11, B), Inclusion of CLTD results in the UL TD Technical Report | Nokia Siemens Networks, Ericsson, Nokia, ST-Ericsson | Noted |
R1‑113410 | Pilot design options for 4-Tx MIMO for HSDPA | Nokia Siemens Networks, Nokia | Noted |
R1‑113411 | Codebook options for 4-Tx MIMO for HSDPA | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑113412 | Standardisation of 4 antenna MIMO for HSPA+ | Nokia Siemens Networks, Nokia | Noted |
R1‑113413 | Initial performance results of 4-Tx MIMO for HSDPA | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑113414 | Considerations on standalone HS-DPCCH/E-DCH in the CELL_FACH state | Nokia Siemens Networks, Nokia | Noted |
R1‑113415 | RAN1 specification impacts of HSDPA Multiflow | Nokia Siemens Networks, Nokia | Noted |
R1‑113416 | Initial status and synchronization behaviour for CLTD | Ericsson, ST-Ericsson | Not treated |
R1‑113417 | F-PCICH quality control for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑113418 | Interactions of HS-SCCH orders and RRC reconfigurations for CLTD | Ericsson, ST-Ericsson | Noted |
R1‑113419 | Definition of UPH for CLTD | Ericsson, ST-Ericsson | Not treated |
R1‑113420 | Review of CLTD draft CRs | Ericsson, ST-Ericsson | Withdrawn |
R1‑113421 | DTX codeword for 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑113422 | Review of 8C-HSDPA CRs | Ericsson, ST-Ericsson | Withdrawn |
R1‑113423 | 25.211 CR0288R3 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑113424 | 25.212 CR0296R4 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑113425 | 25.213 CR0109R4 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑113426 | 25.214 CR0652R4 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑113427 | Stand-alone HS-DPCCH without ongoing E-DCH transmissions | Ericsson, ST-Ericsson | Noted |
R1‑113428 | TTI alignment between CELL_FACH and UEs and CELL_DCH Ues | Ericsson, ST-Ericsson | Noted |
R1‑113429 | Reduction in timing of the initial access in the physical random access procedure | Ericsson, ST-Ericsson | Revised |
R1‑113430 | Signaling based interference control - Additional AICH Transmission Timing parameter setting to facilitate IC | Ericsson, ST-Ericsson | Noted |
R1‑113431 | Initial discussion on pilot design for 4-branch MIMO | Ericsson, ST-Ericsson | Noted |
R1‑113432 | 4x4 DL MIMO HS-DPCCH design | Ericsson, ST-Ericsson | Noted |
R1‑113433 | Precoder Codebook design for 4-branch MIMO | Ericsson, ST-Ericsson | Noted |
R1‑113434 | Proposed time plan for 4-branch MIMO transmissions | Ericsson, ST-Ericsson | Noted |
R1‑113435 | Initial considerations on Multi-Flow HSDPA transmissions | Ericsson, ST-Ericsson | Noted |
R1‑113436 | HS-DPCCH for Multi-Flow HSDPA transmissions | Ericsson, ST-Ericsson | Not treated |
R1‑113437 | Timing delay for Multi-Flow HSDPA transmissions | Ericsson, ST-Ericsson | Not treated |
R1‑113438 | Identification of standards impacts of low cost LTE UEs | IPWireless Inc. | Noted |
R1‑113439 | Requirements for a low complexity LTE UE | IPWireless Inc. | Not treated |
R1‑113440 | Initial complexity analysis of MTC LTE UEs | IPWireless Inc. | Noted |
R1‑113441 | Evaluation methodology for the low complexity LTE UE study | IPWireless Inc. | Not treated |
R1‑113442 | Comparison of transmit diversity schemes for PUCCH Format 3 | Mitsubishi Electric | Noted |
R1‑113443 | Proposals on RAN1 aspects for study of Low cost MTC device | Vodafone Group | Noted |
R1‑113444 | Draft skeleton TR proposal "Provision of low-cost MTC UEs based on LTE" | Vodafone Group | Noted - Revised |
R1‑113445 | Downlink control signaling enhancement for CA | HTC | Not treated |
R1‑113446 | Uplink control signaling enhancement for CA | HTC | Noted |
R1‑113447 | Discussion on DL CoMP schemes | HTC, CHTTL | Noted |
R1‑113448 | Enhanced PMI Indication for Refining MIMO Precoder Codebook^^ | HTC | Not treated |
R1‑113449 | CoMP enhancement based on power imbalance observation | HTC | Not treated |
R1‑113450 | Consideration on uplink CoMP | HTC | Withdrawn |
R1‑113451 | Consideration on downlink control signaling enhancement | HTC | Withdrawn |
R1‑113452 | Discussion on support of different TDD UL-DL configurations on different bands | CMCC | Noted |
R1‑113453 | Preliminary simulation results on FeICIC | CMCC | Not treated |
R1‑113454 | Discussion on the common solution for FDD and TDD on improving PCI and system information detection in the presence of dominant interferer | CMCC | Not treated |
R1‑113455 | Discussion on DL CoMP Scheme | CMCC | Noted |
R1‑113456 | Discussion on DM-RS based Downlink Control Signalling Enhancements | CMCC | Withdrawn |
R1‑113457 | On co-existence issue to UTRA LCR TDD | CMCC | Noted |
R1‑113458 | 36.213 CR0362 (Rel-10, F) A correction to PDSCH transmission assumption for CQI calculation | Fujitsu | Noted - Revised |
R1‑113459 | 36.211 CR0167 (Rel-10, F) A correction to PDSCH precoding for CQI calculation | Fujitsu | Noted |
R1‑113460 | Additional carrier types | Fujitsu | Withdrawn |
R1‑113461 | Specification support for CoMP | Fujitsu | Noted |
R1‑113462 | DL MIMO without PMI | Fujitsu | Not treated |
R1‑113463 | Precoding for geographically separated antennas and related codebook | Fujitsu | Noted |
R1‑113464 | Consideration on CSI Feedback for DL CoMP and DL MIMO | Fujitsu | Not treated |
R1‑113465 | Consideration of antenna virtualization in DL MIMO scenario B | Fujitsu | Revised |
R1‑113466 | Consideration on SRS enhancement for DL CoMP | Fujitsu | Revised |
R1‑113467 | Performance evaluatioin considering CRS interference modeling | Fujitsu | Withdrawn |
R1‑113468 | Codeword SINR balance issue in real-life DL MIMO spatial multiplexing. | Fujitsu | Not treated |
R1‑113469 | Downlink control signaling for CoMP | Fujitsu | Noted |
R1‑113470 | Considerations on Enhanced Uplink Power Control for CoMP Scenario 4 | Fujitsu | Not treated |
R1‑113471 | Considerations on PUCCH Enhancement for UL CoMP | Fujitsu | Not treated |
R1‑113472 | Control Signaling Enhancements for DL-MIMO | Fujitsu | Not treated |
R1‑113473 | Enhanced MU-MIMO for scenario B | Fujitsu | Not treated |
R1‑113474 | Low-cost MTC UE | Fujitsu | Not treated |
R1‑113475 | Performance comparison of PDCCH and E-PDCCH | Huawei, HiSilicon | Withdrawn |
R1‑113476 | UL interference control mechanisms in CELL_FACH state | InterDigital Communications, LLC | Withdrawn |
R1‑113477 | Additional carrier types for R11 CA Enhancements | InterDigital Communications, LLC | Not treated |
R1‑113478 | CoMP deployment and the X2 interface | China Unicom | Not treated |
R1‑113479 | Consideration on Codebook Enhancement in Rel-11 | China Unicom | Withdrawn |
R1‑113480 | Discussions on CSI feedback enhancement for geographically separated antennas | China Unicom | Revised |
R1‑113481 | Discussions on CSI Feedback Enhancement for MU-MIMO | China Unicom | Revised |
R1‑113482 | System performance evaluations on FeICIC | Ericsson, ST-Ericsson | Noted |
R1‑113483 | Support of Multiple Timing Advances | Texas Instruments | Not treated |
R1‑113484 | Support of Multiple TDD UL-DL Configurations on Different Bands | Texas Instruments | Noted |
R1‑113485 | Clarification on the assumption of feedback information in PUCCH mode 2-1 | Samsung | Noted |
R1‑113486 | Consideration on uplink power control enhancement in Rel-11 | LG Electronics | Withdrawn |
R1‑113487 | Discussion on UL RS Enhancements for Rel-11 | LG Electronics | Withdrawn |
R1‑113488 | FeICIC performance with CRS interference | Intel Corporation | Noted |
R1‑113489 | Clarification on the assumption of feedback information in PUCCH mode 2-1 | Samsung | Noted |
R1‑113490 | Consideration on CSI feedback for geographically separated antennas | LG Electronics | Withdrawn |
R1‑113491 | Potential Enhancements for UL DMRS | Ericsson, ST-Ericsson | Revised |
R1‑113492 | Potential Enhancements for SRS | Ericsson, ST-Ericsson | Not treated |
R1‑113493 | Enhancements for Uplink Power Control | Ericsson, ST-Ericsson | Not treated |
R1‑113494 | Potential Enhancements for UL DMRS | Ericsson, ST-Ericsson | Not treated |
R1‑113495 | Base Station Power Model | NTT DOCOMO, Telecom Italia, Alcatel Lucent, Ericsson | Not treated |
R1‑113496 | Discussion on CSI feedback granularity in real-life DL MIMO deployments with timing misalignment | ZTE | Noted |
R1‑113497 | System-Level Performance of Range Extended Het-Nets with Explicit Receiver Modeling | Texas Instruments | Noted |
R1‑113498 | Uplink reference signals for CoMP | LG Electronics | Not treated |
R1‑113499 | Uplink power control for CoMP | LG Electronics | Not treated |
R1‑113500 | Consideration of antenna virtualization in DL MIMO scenario B | Fujitsu | Not treated |
R1‑113501 | Consideration on SRS enhancement for DL CoMP | Fujitsu | Not treated |
R1‑113502 | Summary of email discussion [66-02]: Assumptions for CSI reporting | Fujitsu | Noted |
R1‑113503 | Summary of 4-branch MIMO for HSPA session | HSPA session chairman (Huawei) | Endorsed |
R1‑113504 | Summary of Further Enhanced CELL_FACH, 8C-HSDPA, and CLTD CR drafting | HSPA session chairman (Ericsson) | Endorsed |
R1‑113505 | Summary of HSPA maintenance session | HSPA session chairman (NSN) | Endorsed |
R1‑113506 | void | - | Withdrawn |
R1‑113507 | void | - | Withdrawn |
R1‑113508 | void | - | Withdrawn |
R1‑113509 | void | - | Withdrawn |
R1‑113510 | Reduction in timing of the initial access in the physical random access procedure | Ericsson, ST-Ericsson | Noted |
R1‑113511 | On the maximum number of E-DCH resources | Qualcomm Incorporated | Noted |
R1‑113512 | void | - | Withdrawn |
R1‑113513 | 25.212 CR0296R5 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑113514 | 25.213 CR0109R5 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑113515 | 25.214 CR0652R5 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑113516 | void | - | Withdrawn |
R1‑113517 | CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑113518 | CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑113519 | CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑113520 | CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑113521 | CR for 25.215: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑113522 | LS on RAN1 agreements for Further Enhanced CELL_FACH | Qualcomm | Noted - Revised |
R1‑113523 | CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑113524 | CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑113525 | CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑113526 | CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑113527 | CR for 25.215: Introduction of Uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Endorsed |
R1‑113528 | 25.212 CR0296R6 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑113529 | 25.213 CR0109R6 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑113530 | 25.214 CR0652R6 (Rel-11,B) Introduction of 8C-HSDPA | Ericsson, ST-Ericsson | Endorsed |
R1‑113531 | void | - | Withdrawn |
R1‑113532 | Applicable scenarios for TDD CA of different UL-DL configurations | Ericsson, ST-Ericsson | Noted |
R1‑113533 | 36.213 CR0356R2 (Rel-10, F) Corrections on HARQ-ACK feedback procedures | Huawei, HiSilicon | Noted |
R1‑113534 | Draft reply LS on radio metrics with respect to QoE | Qualcomm Inc. | Noted - Revised |
R1‑113535 | Further evaluations on asymmetric and enhanced symmetric beamforming for CLTD | Huawei, HiSilicon | Noted |
R1‑113536 | Correction on PUSCH resource mapping for aperiodic SRS | ASUSTeK | Withdrawn |
R1‑113537 | 36.211 CR0168 (Rel-10, F) Correction to figure of CSI-RS pattern in extended-CP subframe | ZTE | Agreed |
R1‑113538 | 36.212 CR0130R1 (Rel-10, F) Corrections on codebook index indication in DCI format 4 | Huawei, HiSilicon | Agreed |
R1‑113539 | Further Evaluation on Transmit Diversity for Channel Selection | Research In Motion UK Limited | Noted |
R1‑113540 | Enhancements to DL MU-MIMO CSI Feedback | NEC Group | Not treated |
R1‑113541 | 36.213 CR0324R2 (Rel-10, Cat F) Accumulation of power control commands from DCI format 3/3A with UL transmission | Ericsson, ST-Ericsson, Qualcomm, RIM, Huawei, HiSilicon, Panasonic | Revised |
R1‑113542 | 36.213CR0357R1 (Rel-10, Cat F) Miscellaneous corrections on uplink power control | CATT | Agreed |
R1‑113543 | 36.213 CR0361R1 (Rel-10, F) Corrections on PUCCH mode 2-1 | Samsung, ZTE, LG Electronics, Motorola Mobility | Agreed |
R1‑113544 | 36.213 CR0363 (Rel-10, F) Alignment of Notation between TS36.211v10.3.0 and TS36.213v10.3.0 | Samsung | Noted - Revised |
R1‑113545 | 36.213 CR0364 (Rel-10, F) on SRS transmission comb | ZTE | Agreed |
R1‑113546 | 36.213 CR0365 (Rel-10, F) Clarification on the HARQ-ACK procedure of TDD UL-DL configuration 5 | ITRI | Agreed |
R1‑113547 | 36.213 CR0366 (Rel-10, F) Clarification on the determination of resource for PUCCH Format 1b with channel selection in TDD mode | ITRI, Qualcomm Inc. | Noted - Revised |
R1‑113548 | Discussion on Multi-Point CSI Feedback for Downlink CoMP | Samsung | Not treated |
R1‑113549 | Discussions on CSI feedback enhancement for homogeneous macro network | Samsung | Revised |
R1‑113550 | Discussions on CSI feedback enhancement for outdoor low-power Tx points | Samsung | Noted |
R1‑113551 | LS on additional carrier types for carrier aggregation enhancement | RAN1, Alcatel-Lucent | Agreed |
R1‑113552 | Discussion on Solution of stand-alone HS-DPCCH feedback | Huawei, HiSilicon | Noted |
R1‑113553 | Transmit diversity for PUCCH Format 3 | CATT | Noted |
R1‑113554 | 36.213 CR0367 (Rel-10, F) Corrections on HARQ-ACK procedure | LG Electronics, CATT, Qualcomm, Research In Motion, Samsung, ZTE, Panasonic, Texas Instruments | Noted - Revised |
R1‑113555 | Downlink control signaling for downlink CoMP | ETRI | Noted |
R1‑113556 | Downlink control signaling enhancements | New Postcom | Not treated |
R1‑113557 | Transmit diversity for PUCCH Format 3 | Ericsson, ST-Ericsson | Noted |
R1‑113558 | Way Forward on downlink control channel enhancements by UE-specific RS | Ericsson, ST-Ericsson, NTT DOCOMO | Withdrawn |
R1‑113559 | Performance Evaluation for FeICIC | LG Electronics | Noted |
R1‑113560 | Possible Approaches and Impacts of Low-Cost MTC UEs based on LTE | HTC | Not treated |
R1‑113561 | Enhancement of 4Tx feedback codebook and MU-MIMO feedback | LG Electronics | Noted |
R1‑113562 | void | - | Withdrawn |
R1‑113563 | Uplink control signals for CoMP | LG Electronics | Not treated |
R1‑113564 | WF on Reference Signal for Interference Measurement | CATT, LGE, Intel, Motorola Mobility, CMCC | Not treated |
R1‑113565 | PDSCH performance evaluation for FeICIC | Samsung | Noted |
R1‑113566 | eICIC evaluations for different handover biases | Qualcomm Inc. | Noted |
R1‑113567 | Way Forward on channel measurements for CoMP | Huawei, HiSilicon, Samsung, LG Electronics, Ericsson, ST-Ericsson, Texas Instruments, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, Panasonic, Renesas Mobile | Noted |
R1‑113568 | WF on UL simulation for calibration in scenario 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon,KDDI, LGE, Nokia, NSN,NTT DOCOMO, Panasonic, Sharp | Noted |
R1‑113569 | Way forward on 4Tx enhancement for DL MIMO | ALu, A-LuShanghaiBell, AT&T, CATT, CATR, CMCC, ETRI, Huawei, Hi-Silicon, HTMobile, Intel, ITRI, LGE, MediaTek, Motorola Mob, NEC, NewPostcom, NTT DOCOMO, Orange, Panasonic, Pantech, Potevio, Qualcomm, RIM, Samsung, Sharp, Vodafone, ZTE | Noted |
R1‑113570 | [DRAFT] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | Huawei, HiSilicon | Noted - Revised |
R1‑113571 | Simulation Assumptions for DL Control Signaling | Samsung | Noted - Revised |
R1‑113572 | Scenarios for UE Performance Requirements under Macro-Femto Deployments | HTC | Not treated |
R1‑113573 | WF on PDSCH muting on CRS for feICIC | Texas Instruments, LG Electronics, Motorola Mobility | Noted |
R1‑113574 | Tx-based solutions for CRS interference handling | LG Electronics | Noted |
R1‑113575 | Way Forward on Improved DL Control Channel, Broadcast and System Information Detection in Dominant Interferer Scenarios | LG Electronics, Texas Instruments, CMCC | Noted |
R1‑113576 | Discussions on CSI feedback enhancement for geographically separated antennas | China Unicom | Not treated |
R1‑113577 | Discussions on CSI Feedback Enhancement for MU-MIMO | China Unicom | Not treated |
R1‑113578 | Further performance results of Cell Range Extension with eICIC | NEC Group | Noted |
R1‑113579 | WF on Evaluations for Identification Scenarios | CMCC, Deutsche Telekom, InterDigital, Hitachi, LG Electronics, Orange, Qualcomm Inc, Samsung, SKT, Verizon Wireless | Noted - Revised |
R1‑113580 | 36.213 CR0368 (Rel-10, F) Correction for A/N on PUSCH with W=1,2 in case of TDD channel selection | LG Electronics, Huawei, HiSilicon, Qualcomm, Samsung | Agreed |
R1‑113581 | [Draft LS] on Antenna port mapping onto geographically seperated antennas | Ericsson | Noted - Revised |
R1‑113582 | WF on antenna spacing for scenario C | NTT DOCOMO, AT&T | Agreed |
R1‑113583 | Draft skeleton TR proposal "Provision of low-cost MTC UEs based on LTE" | Vodafone Group | Noted - Revised |
R1‑113584 | Discussions on CSI feedback enhancement for homogeneous macro network | Samsung | Noted |
R1‑113585 | WF on Evaluations for Identification Scenarios | CATT, CMCC, Ericsson, Deutsche Telekom, InterDigital, Hitachi, HiSilicon, Huawei, LG Electronics, Nokia Siemens Networks, Orange, Qualcomm Inc, Samsung, SKT, STE Ericsson, Verizon Wireless, ZTE | Noted |
R1‑113586 | Impact of inter-point antenna calibration error on CoMP performance with channel reciprocity in TDD system | ZTE | Noted |
R1‑113587 | TR36.871v1.0.0 Downlink MIMO Enhancement for LTE-Advanced | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑113588 | [Draft LS] on Antenna port mapping onto geographically seperated antennas | Ericsson | Noted - Revised |
R1‑113589 | Way Forward on downlink control channel enhancements by UE-specific RS | Ericsson, ST-Ericsson, NTT DOCOMO, Huawei, HiSilicon, ETRI, Panasonic, Samsung | Noted |
R1‑113590 | 36.213 CR0362R1 (Rel-10, F) A correction to PDSCH transmission assumption for CQI calculation | Fujitsu | Noted - Revised |
R1‑113591 | LS on UL TA synchronization for SCell TA groups | LG Electronics | Not treated |
R1‑113592 | Way forward on CoMP Transmission mode | Nokia Siemens Networks, Nokia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, KDDI, ST-Ericsson, Qualcomm, Texas Instruments | Noted |
R1‑113593 | 36.213 CR0324R3 (Rel-10, Cat F) Accumulation of power control commands from DCI format 3/3A with UL transmission | Ericsson, ST-Ericsson, Qualcomm, RIM, Huawei, HiSilicon, Panasonic | Agreed |
R1‑113594 | DL RS for CoMP Chairman’s Notes | Ad-hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑113595 | Summary of UL COMP Ad-hoc Session | Ad-hoc Chairman (Samsung) | Endorsed |
R1‑113596 | Summary of TxD and CA-TDD Ad-hoc Session | Ad-hoc Chairman (Samsung) | Endorsed |
R1‑113597 | Chairman’s Notes on FeICIC | Ad-hoc Chairman (NTT DoCoMo) | Endorsed |
R1‑113598 | CR Clarification of PUCCH 2-1 operation | Qualcomm Incorporated, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Intel Corporation, LG Electronics, Panasonic Corporation, Renesas, Samsung | Noted - Revised |
R1‑113599 | Summary on discussion for R1-113398 | ASUSTeK | Noted |
R1‑113600 | Rate-matching for contention-based Msg3 in UE-specific aperiodic SRS subframe | ASUSTeK | Withdrawn |
R1‑113601 | Simulation Assumptions for DL Control Signaling | RAN1 | Noted - Revised |
R1‑113602 | Simulation Assumptions for DL Control Signaling | RAN1 | Agreed |
R1‑113603 | Addition special subframe configuration in Rel-11 | CMCC, CATT, Huawei, HiSilicon, MediaTek, Potevio, Qualcomm, Ericsson, ST-Ericsson, ZTE | Noted |
R1‑113604 | Draft skeleton TR proposal "Provision of low-cost MTC UEs based on LTE" | Vodafone Group | Noted - Revised |
R1‑113605 | Reply LS on radio metrics with respect to QoE | RAN1, Qualcomm Inc. | Agreed |
R1‑113606 | 36.213 CR0369 (Rel-10, F) Clarification of PUCCH 2-1 operation | Qualcomm Incorporated, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Intel Corporation, LG Electronics, Panasonic Corporation, Renesas, Samsung | Agreed |
R1‑113607 | LS reply on TDD inter-band CA with different UL-DL configurations on different bands | RAN4, CATT | Noted |
R1‑113608 | 36.213 CR0367R1 (Rel-10, F) Corrections on HARQ-ACK procedure | LG Electronics, CATT, ZTE, Ericsson, ST-Ericsson, Qualcomm, New Postcom, Panasonic, Samsung, Research In Motion, Texas Instruments | Agreed |
R1‑113609 | 36.213 CR0366R1 (Rel-10, F) Clarification on the determination of resource for PUCCH Format 1b with channel selection in TDD mode | ITRI | Noted - Revised |
R1‑113610 | LS on Antenna port mapping onto geographically seperated antennas | RAN1, Ericsson | Agreed |
R1‑113611 | 36.213 CR0366R2 (Rel-10, F) Clarification on the determination of resource for PUCCH Format 1b with channel selection in TDD mode | ITRI, Qualcomm Inc. | Agreed |
R1‑113612 | 36.213 CR0362R2 (Rel-10, F) A correction to PDSCH transmission assumption for CQI calculation | Fujitsu | Agreed |
R1‑113613 | LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA | RAN1, Huawei | Agreed |
R1‑113614 | LS on RAN1 agreements for Further Enhanced CELL_FACH | RAN1, Qualcomm | Agreed |
R1‑113615 | Common parameters for UL CoMP evaluation | Nokia Siemens Networks | Agreed |
R1‑113616 | TR36.888 v0.1.0 "Provision of low-cost MTC UEs based on LTE" | Vodafone Group | Agreed |
R1‑113617 | 36.213 CR0363R1 (Rel-10, F) Alignment of Notation between TS36.211v10.3.0 and TS36.213v10.3.0 | Samsung | Agreed |
R1‑113618 | Email Discussion Summary on Coverage Enhancements SI | China Telecom (Rapporteur) | Revised |
R1‑113619 | Email Discussion Summary on Coverage Enhancements SI | China Telecom (Rapporteur) | Endorsed |
page generated from database: 2024-07-20 12:15:34